Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
21/02/2024 
A special hybrid meeting of Perth and Kinross Council will be held in the Council
Chamber on Wednesday, 28 February 2024 at 10:30. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN 
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members: 
Provost X McDade
All Councillors 
Page 1 of 274

Page 2

Page 2 of 274

Page 3

Perth and Kinross Council 
Wednesday, 28 February 2024 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY FINANCIAL
OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY ITEM ON THIS
AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE OF CONDUCT. 
1 WELCOME AND APOLOGIES   
2 DECLARATIONS OF INTEREST   
3 STRATEGIC PLANNING UPDATE AND 2024/25 TO 2026/27
GENERAL FUND REVENUE BUDGET
Report by Strategic Lead - Finance and Business Support (copy
herewith 24/63) 
5 - 220 
4 STRATEGIC INVESTMENT AND CAPITAL BUDGET UPDATE
2024/25-2029/30
Report by Head of Finance (copy herewith 24/64) 
221 - 274 
Page 3 of 274

Page 4

Page 4 of 274

Page 5

PERTH & KINROSS COUNCIL 
28 FEBRUARY 2024 
STRATEGIC PLANNING UPDATE AND 
2024/25 TO 2026/27 GENERAL FUND REVENUE BUDGET 
Report by the Strategic Lead – Finance & Business Support
(Report No. 24/63) 
1. PURPOSE 
1.1 The purpose of this report is to: 
• provide an update on the how the Council’s approach to organisational
transformation and budget planning activity mitigates, as far as possible,
the impact of the financial challenges facing the Council. 
• present the 2024/25 and 2025/26 updated provisional General Fund
Revenue Budgets, based on decisions taken by Council on 1 March
2023 (see Section 7) and present the 2026/27 provisional General Fund
Revenue Budget. 
• seek the Council’s approval to set the indicative Council Tax level for
2026/27. 
• provide an update on and seek approval of the Council’s Reserves
Strategy. 
• provide an update on the financial risks facing the Council over the
medium term, including significant inflationary and pay pressures,
uncertainty over future funding levels and potential challenges for our
partners. 
2. RECOMMENDATIONS 
2.1 It is recommended that Council: 
A. notes the update on transformation activities – see paragraph 5.30. 
B. approve the offer of funding from the Scottish Government to support a
Council Tax freeze in 2024/25 – see paragraph 7.16. 
C. approves the 2024/25, 2025/26 and 2026/27 Provisional Revenue
Budgets as set out in Appendix B – see paragraph 7.22. 
D. agrees a Council Tax collection rate of 98% in 2024/25, 2025/26 and
2026/27 – see paragraph 7.29. 
3
Page 5 of 274

Page 6

E. approves the Council Tax bases set out in Table 7 – see paragraph
7.32. 
F. approves no increase in Council Tax for 2024/25 – see paragraph 7.35. 
G. approves indicative Council Tax increases for 2025/26 and 2026/27 of
4.9% and 4% respectively – see paragraph 7.40. 
H. approves 1% of future Council Tax increases be allocated towards loan
charges that will support the Capital Budget – see paragraph 7.39. 
I. approves the contribution of £87.438 million to Perth & Kinross
Integration Joint Board in the 2024/25 Provisional Revenue Budget –
see paragraph 7.53. 
J. maintain a prudent approach to the application of reserves and earmark
the General Fund Balances identified in Table 11 and Appendix H –
see paragraph 8.11. 
K. approves that uncommitted Reserves are maintained at a minimum of
2% to 4% of the 2024/25 Net Revenue Budget which equates to £9.254
million to £18.508 million – see paragraph 8.18. 
L. determines the 2024/25 Final Revenue Budget. 
M. determines the 2025/26 Updated Provisional Revenue Budget. 
N. determines the 2026/27 Provisional Revenue Budget. 
3. STRUCTURE 
1.1 This report is structured as follows: 
Section 4 – Background – Strategic Context
Section 5 – Transformation and Change Programme
Section 6 – Scottish Government Budget
Section 7 – 2024/25, 2025/26 & 2026/27 Provisional Revenue Budgets
Section 8 – Reserves Strategy
Section 9 – Risk Assessment
Section 10 – Conclusions 
4. BACKGROUND – STRATEGIC CONTEXT 
4.1 Like all councils, Perth & Kinross Council is facing an increasingly complex
and challenging financial situation, as pressures, service demands and
workforce pressures increase, with the ongoing impacts of the cost-of-living
and funding forecast to be reduced in real terms. The financial challenges
have occurred alongside significant commitments such as climate change and
tackling child poverty, with many households facing crisis, increasing child
poverty and financial hardship, all placing additional pressures on Council
Page 6 of 274

Page 7

services.  Between 2020/21 and 2021/22 the number of children living in
poverty across Perth and Kinross has increased to 5,914. 
4.2 To make the best use of its available resources, the Council must continue to
review how it operates. To do this it must take decisions on what it will stop
doing, do less of, do more efficiently or do differently through service redesign
and working in collaboration with partners and communities, and in so doing
reshape its workforce. Council will also wish to consider areas where it seeks
to increase investment to reflect its agreed corporate priorities and take
account of the financial principles it has already agreed, at the heart of which
was a commitment for financial decisions to be based on data and evidence,
whilst focusing on real need and not necessarily traditional demands, which
did not fit with our priorities. 
4.3 There are several key drivers which require the Council to maintain its pace of
change and transformation including: 
• new and emerging priorities – social, economic and climate – that
require the Council to review what, how and where it delivers services to
meet these challenges. 
• a growing ageing population and increasing complexity of need and
demand for care, support and protection. 
• the continuing cost-of-living crisis, which increases the need for support
and services, often to those who were already experiencing inequality. 
4.4 Bringing together the Council’s budget and change plans, supports greater
alignment between its agreed strategic priorities and how it allocates
resources to minimise the impact of budget cuts. 
4.5 In bringing forward these budget proposals, officers have sought to find a
balance between delivering the required level of unavoidable service
reductions whilst protecting services for the most vulnerable people and
communities. To do this, officers have followed the principles set out within
the Council’s policy framework as described below. 
Our Policy Frameworks for Change 
4.6 The Council’s policy framework provides parameters for how it will make
difficult decisions to deliver its agreed priorities by taking an evidence-based
approach and placing a focus on need and by better managing demand. 
4.7 The Council’s Corporate Plan 2022-27 approved in December 2022 (Report
No. 22/311) sets our vision for “a Perth and Kinross where everyone can
live life well, free from poverty and inequality”. 
4.8 The Council’s seven key priorities show how it will address the challenges it
faces and focus its work where it is needed most to support the delivery of
that vision: 
Page 7 of 274

Page 8

• Working in partnership with communities, 
• Tackling poverty, 
• Tackling climate change and supporting sustainable places, 
• Developing a resilient, stronger and greener local economy, 
• Enabling our children and young people to achieve their full potential, 
• Protecting and caring for our most vulnerable people,
• Supporting and promoting physical and mental wellbeing. 
4.9 As the financial pressures facing the Council increase, there is an increasing
need for the Council to review its priorities and the extent to which these can
be met, to ensure investment is effectively targeted against these seven
areas. Officers will continue to consider this work as they report on
performance and update Council later this year through the Corporate
Delivery Improvement Plan. 
4.10 In recognition of the challenges the Council faces and to ensure that it
continues to deliver on its priorities, a Financial Strategy was approved in
June 2022. 
4.11 The Financial Strategy is the link between the Council’s long-term priorities
and its financial capacity. It aims to build resilience and ensure that the
Council has an affordable and sustainable Medium Term Financial Plan,
which directs its resources to where they are most needed. The financial
principles agreed by Council have been applied to the budget proposals: 
• Direct resources where they are most needed,
• Prioritise the delivery of services we must provide by law,
• Prioritise upfront investment in early intervention and prevention,
• Not fund recurring activity from general fund reserves,
• Minimise unnecessary expenditure and maximise income,
• Take a planned and sustainable approach to capital investment,
• Protect the most vulnerable in our community,
• Deliver services in the most cost-effective manner,
• Prioritise transformation investment on cost mitigation measures,
• Contain spending within approved budgets,
• Over plan for the delivery of savings,
• Reflect the full cost of capital investments in future budgets,
• Agree indicative budgets for a minimum of two further financial years
when setting revenue budgets. 
4.12 The Council approved the updated Medium Term Financial Plan (MTFP) on 4
October 2023.  This update considered future funding levels, increasing costs
and rising need / demand over the short to medium term, insofar as they may
impact on Perth & Kinross Council.  It is anticipated that the MTFP will be
further updated in October 2024. 
4.13 The MTFP places the development of budgetary strategy in the context of
delivering the Council’s key outcomes and considers the financial and process
risks in the management of the Council’s finances. The MTFP   informs the
direction of the Council for financial planning purposes. As detailed budget
Page 8 of 274

Page 9

proposals are developed, the broad assumptions included within the MTFP
are superseded by more detailed analysis of individual cost pressures and the
identification of budget reduction options. The refinement of these
assumptions is included in the 2024/25, 2025/26 and 2026/27 Provisional
Revenue Budgets. 
4.14 On 4 October 2023, the Council also approved the Draft Corporate Delivery
and Improvement Plan 2024/25 (Report No. 23/266). The CDIP will set out
the improvement actions the Council will take in the year ahead to achieve its
longer-term vision and priorities. This approach will enable elected members
to better consider organisational priorities and improvements alongside
budget setting. The final CDIP will be brought back to Council for approval
after the final 2024/25 budget is agreed. This will enable any adjustments
following agreement on the budget to ensure improvement activity is aligned
with the funded priorities set by Council. 
4.15 In June 2022, the Council agreed a five-year Transformation & Change
Strategy (Report No. 22/142 refers). This recognised that the shape and
structure of the organisation, as well as the way it operates, needs to
transform.  The Finance & Resources Committee considered Transformation
& Strategy Update report on 13 November 2023 (Report No. 23/245 refers).  It
is anticipated that a further update will be provided on 24 April 2024. 
4.16 Transformation alone will not address the structural deficit and budget cuts
and service reductions will continue to be required. However, the work being
undertaken through the Transformation and Change Programme has reduced
spend, mitigated costs, and enabled a shift of expenditure to the Council’s
priorities. Demand management continues to be considered to ensure that the
right services reach the right people, where and when they are needed,
leading to better use of available resources. A combination of measures and
approaches will continue to contribute towards the removal of the structural
deficit, with the aim of delivering a balanced budget and removing the need to
draw on Reserves. 
5. TRANSFORMATION AND CHANGE PROGRAMME 
5.1 This section sets out the main activities undertaken over the last year in
delivering the Transformation & Change Programme. 
5.2 The Transformation and Change Strategy recognised that due to the size and
complexity of the Council, a range of approaches to change would be
required: 
• transforming our customer’s experience,
• transforming the shape and structure of our organisation,
• transforming our systems and processes,
• transforming our spending and response to demand. 
5.3 Work during year one (2023/24) focused on implementing of phase 1 of the
Strategic Leadership Review and delivery of the 9 consolidation workstreams. 
Phase 2 transformation projects were also progressed, with a greater focus
Page 9 of 274

Page 10

on operational service delivery, re-design and efficiency.  This work will
continue under new Strategic Lead service portfolios.  Appendix A to this
report outlines the overall status of the programme. 
5.4 Within the Strategic Planning Update and 2023-26 General Fund Budget
Report in March 2023 (Report 23/72), funding was approved to provide
additional capacity, enable a greater focus on planning and support to the
delivery of the overall programme.  The following sections outline the progress
made in terms of the programme delivery, as well as the work undertaken to
create the conditions for change. 
Phase 1 progress Update - Consolidation 
5.5 The Transformation and Change Strategy recognised the need for the Council
to take a greater collaborative approach to the delivery of our priorities.  The
consolidation workstreams have brought together previously disaggregated
functions from across the Council under single points of management. This
has addressed areas of duplication, delivered efficiencies and introduced
greater consistency across the organisation. Projects have also delivered a
range of system and process improvements, which will continue to be
progressed over the coming months, with a focus on performance and
outcomes.   
5.6 Each project has delivered a range of benefits, however there are some which
are common to them all, demonstrating achievement of the objectives set out
in the Transformation and Change Strategy: 
• greater collaborative working, with project teams working together,
sharing knowledge and experience, and building relationships.
• the creation of boards in several projects means that decisions are being
made at the right time and by the right people.
• baselining and benchmarking information has identified where system
and process improvements could be made.  
• feedback from some community groups have highlighted that they have
seen positive changes in how the Council works with local communities. 
5.7 The Customer Services workstream set out to place our citizens and our
communities at the heart of how we work through adopting a customer-centric
approach to digital improvement activities.  This project continues to deliver
better outcomes for customers, for example through a channel shift to make
more services available online.  Evidence shows that more customers are
choosing to make use of these services and are getting a better experience,
with almost 93% rating their online experience as good or excellent.  All
school enrolments were processed online this year, which improves both the
customer experience and rationalises internal processes. 
5.8 The Pitlochry Asset Review is considering all Council property assets (excl.
social housing) within the Pitlochry area to ensure they align with future
service delivery and community needs and make best use of resources. 
Extensive consultation was undertaken with the community, service users,
partners and local elected members to establish the best option, focused on
Page 10 of 274

Page 11

needs as well as considering local aspirations.  Finalised proposals will be
brought forward to the recently established Strategic Investment Advisory
Group for consideration by elected members in terms of service delivery,
affordable housing, community asset transfer and co-location of services,
before reporting to Council. 
Leadership Review – Progress 
5.9 Phase 1 of the Leadership Review is almost complete, with the new structure
due to be fully implemented by April 2024.  The newly formed Strategic
Leadership Team (SLT) is realigning responsibilities and resources under
each of the Strategic Leads and is reviewing the Council’s internal
governance arrangements.  This includes a streamlining of existing
arrangements and the establishment of themed Boards linked to the priorities
within the Corporate Plan ensuring a broader oversight of performance and
outcomes.   
5.10 Following positive feedback last year, the SLT will following the budget
setting, return to holding monthly sessions in localities across the Council
area.  By meeting with local community representatives, the Council’s senior
leaders have an opportunity to better understand each locality’s needs and
priorities including opportunities for communities to develop their local action
plans and consider service and asset management or transfer. Officers will be
bringing back a further report to Council on engagement with communities as
part of a further transformation workstream. 
5.11 Alongside this internal engagement, internal engagement arrangements
continue to be reviewed and developed as we seek to ensure that we are
listening to, using the expertise of our full team and supporting the change
going on throughout the organisation. This engagement will be supported by a
first full staff survey since 2022. This will be carried out early in the coming
financial year. 
Transformation Supported Resource Reduction 
5.12 In preparing this budget submission, transformation leads have worked
closely with finance colleagues to ensure: 
i. Close alignment with the budget process 
ii. Any resource reduction proposals identified from transformation are
incorporated within budget proposals, and 
iii. Where possible cuts are considered and incorporated into transformation
and change reviews to mitigate impact for service users and our
workforce 
5.13 Due to the significant financial challenges faced, this process has been
complex.  Project leads have, as far as possible: 
i. Assessed the financial details of each activity within scope. 
ii. Mapped savings already identified within the budget process related to
their workstream.
Page 11 of 274

Page 12

5.14 Whilst transformation will not mitigate the full impact of cuts, it will make best
use of remaining resources to ensure the Council continues to meet its
statutory responsibilities, service priorities and external and internal customer
needs, where possible.   
5.15 Reductions in service budgets of £1.042 million have been achieved in
2023/24. A further £1.713 million, previously agreed for 2024/25 has largely
been delivered and work is underway to achieve a further £3.288 million for
2025/26 across the whole programme. In addition, the new Strategic
Leadership Structure approved by the Finance & Resources Committee on 20
June 2023 (Report No. 23/195) will contribute further recurring savings of
£789,000 by 2026/27. 
5.16 The 2024/25, 2025/26 and 2026/27 Provisional Revenue Budgets includes
reductions in expenditure from Strategic Commissioning & Procurement (£1.5
million) and phase 2 of the leadership review (£1.5 million). 
5.17 In total the programme has generated and is targeted to deliver over £10
million in reduced costs and resources by 2026/27. As projects continue to
be identified and progressed; cost avoidance and further reductions in
resourcing will be identified and reported to Council. 
Progress Update – Culture & Behaviours 
5.18 To enable the change required, we recognise the need to set the right
conditions so that our people feel supported through organisational
transformation.  Fundamental to supporting our employees is the cultural
engagement programme, which has a focus on the Council’s purpose, vision
and values, ensuring that these are reflected in behaviours.  It looks to
continue to grow a culture where individuals are valued and treated with
respect. 
5.19 Over the past year, a new Leadership and Competencies Framework and
Performance and Development Discussion framework have been introduced. 
These set out the behaviours, skills and actions needed from our leaders and
staff, with a focus on performance and outcomes which contribute towards the
Council’s priorities.   
5.20 Reshaping our workforce is key as we move through the change process to
enable a shift of resources to where they are needed most, whilst also
developing and skilling our employees to meet changing priorities.  These
changes will take time to be fully effective and a new 3-year People and
Culture Strategy is currently being developed to create the conditions to
enable delivery of this. 
Supporting our workforce 
5.22 The Council recognises the impact that the budget and change proposals will
have on its employees. As an organisation of people delivering services to, for
and with people our employees are the Councils most important asset. We
remain committed to engaging with, supporting, and developing our
Page 12 of 274

Page 13

employees as we re-shape our workforce to deliver the services our
communities need. As we see reductions in our workforce through required
budget measures, it is imperative that officers and members continue to focus
on organisational priorities. This will see a reduction on officer capacity to
respond to and deliver non statutory and/or non priority activities, including
those requests made by members. There is a continuing requirement for
officers and members to set out the impact of budget reductions to
communities and that Council will not be able to continue to deliver all
services at the levels which have previously been available. 
5.23 A new People and Culture Strategy that reflects the Council’s values and
incorporates workforce planning, health and wellbeing, growing organisational
culture, engagement, along with a programme of training and development
will be submitted to Committee later in 2024.   
5.24 The Framework for Managing Workforce Change was reviewed in February
2023 (Report No. 23/33 refers). The framework ensures that the Council
promotes fair, consistent, and equitable treatment of employees during
change. It is one of several tools that support transformation, a culture of
innovation, our ongoing commitment to employability, as well as supporting
learning opportunities for all employees affected by transformation and
change. 
5.25 In recognition of the changes to how and where we work, the draft Flexible
Working Framework was approved by the Finance and Resources Committee
on 31 January 2024 (Report 24/42). The Framework brings together the
different provisions which support increased levels of flexibility, formalises
hybrid working as a workstyle and sets out key principles which help maintain
a focus on operational and customer need.  The Working Smarter project will
ensure both staff and office space work to optimum efficiency. 
Next Steps 
5.26 The next phase of the Transformation and Change programme will be
essential for the Council to help mitigate the significant financial challenges
that it faces. With Strategic Leads now in post and getting up to speed with
their new remits and new teams, there is an opportunity to review portfolios
and identify areas for service redesign and business improvement. 
5.27 Work is already underway to develop business insights profiles which will
focus on developing and improving the quality of business intelligence across
the Council that will support the ability to identify options and opportunities for
change and redesign. 
5.28 The profiles will also inform Phase 2 of the Leadership Review, which will
include redesigning the functions and structures which support Strategic Lead
portfolios.  The budget reductions for 2024/25 and beyond will be achieved
through a range of measures i.e. realignment of teams and structures, a
review of budget reductions over recent years to see the impacts on all
service areas, leadership capacity at all levels across the organisation and
Page 13 of 274

Page 14

workforce management arrangements to optimise how resource is utilised
across the Council. 
5.29 Once final budget decisions have been made, all proposals will be reviewed
alongside transformation and change projects and service delivery
arrangements. This will fully align the Council’s budget and change plans to
ensure the best use of remaining resources to deliver on our agreed priorities.
This model of linking organisational change, workforce and asset
management planning and budget considerations will be further embedded
over the coming year and reflected in updates via Finance and Resources
Committee and future Strategic Planning and Budget reports. 
5.30 ACTION: Note the update on transformation activities –
RECOMMENDATION A 
6. SCOTTISH GOVERNMENT BUDGET 
6.1 The principles and approach set out in the previous section have been applied
within the context of the budget available to the Council for this year. This is
largely informed by the decisions made in the Scottish Government Budget. 
6.2 The Scottish Government budget for 2024/25 was published on 19 December
2023 which was followed by Local Government Finance Circular 8/2023 on 21
December. 
Local Government Finance Circular 8/2023 
6.3 Local Government Finance Circular 8/2023 includes the provisional financial
settlement for 2024/25 at an individual Council level.  The Settlement only
included information for 2024/25. 
6.4 The Circular provides details of the provisional total Revenue and Capital
funding allocations for 2024/25, as well as the latest information on funding
redeterminations for 2023/24. The Circular also provides details on a range of
business rates measures, including the 2024/25 Non-Domestic Rates
poundage. 
6.5 The provisional total funding allocations form the basis for the annual
consultation between the Scottish Government and COSLA ahead of the
Local Government Finance (Scotland) Order 2023 being presented to the
Scottish Parliament. This is currently scheduled for 28 February 2024. 
6.6 The Circular sets out a national funding package of £13.9 billion and
includes: 
• £950.9 million that has now been baselined into General Revenue
Grant.
• an additional £230 million to deliver the payment of £12 per hour
minimum pay settlement for adult social care workers.
Page 14 of 274

Page 15

• an additional £11.5 million to support the uprating of free personal and
nursing care rates.
• an additional £6 million to support the expansion of the free school
meals policy.
• an additional £6.8 million for discretionary housing payments.
• £145.5 million to support additional teachers and support staff.
• £242 million to support teacher pay uplifts, and.
• £266.2 million to support local government pay. 
6.7 As has been the case in previous years, Finance Circular 8/2023 also
contained information on revenue funding which has still to be distributed. The
undistributed national funding is set out below. 
• Teachers Induction Scheme – £37.6 million
• Discretionary Housing Payments – £92.7 million
• Gaelic – £0.103 million
• Scottish Disability Allowance – £3.5 million
• Social Care – £230 million
6.8 Based on Finance Circular 8/2023, the total Revenue funding being made
available by the Scottish Government to Perth & Kinross Council in 2024/25 is
£337.738 million (see Table 1 below). 
Table 1: Scottish Government Grant Funding – Perth & Kinross Council 
2024/25 2023/24 
£m £m
General Revenue Funding 269.418 239.627
Non-Domestic Rates 64.514 60.754
Ring-Fenced Grants 3.806 17.725
TOTAL REVENUE FUNDING 337.738 318.106
Source:  Finance Circular 8/2023 – 21 December 2023
Finance Circular 11/2022 – 10 January 2023 
6.9 The 2024/25 Scottish Government provisional funding allocation of £337.738
million represents a £19.632 million increase in absolute cash terms from the
allocation for 2023/24 (or 6.2%). 
6.10 However, the 2024/25 provisional funding allocation includes £18.319 million
where there is an expectation or requirement for the Council to apply funding
for a stated purpose (most notably 2023/24 pay awards and social care (living
wage)). 
Page 15 of 274

Page 16

6.11 Therefore, on a like for like basis, the provisional Scottish Government funding
allocation for 2024/25, represents a £1.313 million increase (or 0.4%) over
the equivalent position for 2024/25 as set out in Finance Circular 11/2022. 
6.12 Table 2 below summarises the movements in the total funding package from
the Scottish Government to facilitate a comparison of the 2024/25 provisional
allocation with 2023/24 on a comparable basis. 
Table 2: Cash Movements between 2023/24 & 2024/25 (on a comparable
basis)   
£m
2023/24 – Finance Circular 11/2022 318.106
2024/25 – Finance Circular 8/2023 337.738  
Year on year cash increase in funding 19.632
Year on year % increase in cash funding +6.2%  
Less: 
- funding directed to service delivery (18.319)  
£ Increase (on a comparable basis) 1.313
% Increase 0.4% 
6.13 The increase set out in Table 2 above does not take account of the additional
impact of inflation, which is significant, or increasing demand for Council
services. 
6.14 The Scottish Government has still to allocate significant funding to Councils
including adult social care, discretionary housing payments and the teachers’
induction scheme.  Once these allocations are known, the Finance &
Resources Committee will be asked to approve the 2024/25 Revenue Budget. 
In addition, the UK Government have announced funding for English local
authorities which may flow through to Scotland through Barnett
Consequentials.  It is anticipated that the outcome of this will not be known
until after the Council meeting on 28 February 2024. 
Implications for the 2024/25 Capital Budget 
6.15 Finance Circular 8/2023 also includes provisional Capital Grant allocations for
2024/25.  The impact of these allocations is included within the Strategic
Investment & Capital Budget 2024/25 – 2029/30 report (Report No. 24/64
refers) which is on the agenda for this special meeting of the Council. 
Non-Domestic Rates 
6.16 Finance Circular 8/2023 also includes the Non-Domestic Basic Rate
poundage for 2024/25 of 49.8p, no change from 2023/24.  Two additional
Page 16 of 274

Page 17

rates are levied on properties with rateable values over £51,000 (54.5 pence)
and £100,000 (55.9 pence) respectively. 
7. 2024/25, 2025/26 & 2026/27 PROVISIONAL REVENUE BUDGETS 
7.1 The Council approved the 2024/25 and 2025/26 Provisional Revenue Budgets
on 1 March 2023.  In doing so, the Council approved expenditure pressures
and budget reductions which are set out in Table 3 below (Report No. 23/72). 
Table 3: Decisions Taken by Council on 1 March 2023 
2024/25
£m
2025/26
£m
Total
£m
Expenditure Pressures 5.542 3.399 8.941    
Budget Reductions 5.140 4.513 9.653 
7.2 As a result of the decisions taken on 1 March 2023, the Council had a known
opening deficit in 2024/25 & 2025/26 of £1.954 million & £1.551 million
respectively.  These deficits are the basis for updating the 2024/25 & 2025/26
Provisional Revenue Budgets and setting the 2026/27 Provisional Revenue
Budget for the first time. 
7.3 The information that follows in this section sets out several adjustments that
are included within the 2024/25, 2025/26 and 2026/27 Provisional Revenue
Budgets. 
7.4 On 8 February 2023, the Council approved a change in accounting policy in
relation to Service Concession arrangements (Report No. 23/43 refers). This
change created recurring capacity of approximately £3 million and a non-
recurring contribution from revenue balances of £31.2 million.  Of the non-
recurring contribution in 2023/24 Revenue Budget, £10 million unwinds in
2024/25 and requires to be addressed. 
7.5 In the revenue monitoring updates considered by the Finance & Resources
Committee, the Council Tax Reduction Scheme has been identified as an
expenditure pressure that requires to be addressed.  On that basis, it is
proposed that £1.2 million is added to the base budget for this activity. 
7.6 Two adjustments are required in relation to staff costs.  Firstly, because this
is the first time the Council has set the 2026/27 Provisional Revenue Budget,
it is necessary to include a provision for pay awards.  Consistent with the
Medium-Term Financial Plan, approved by Council in October 2023, the
budgeted increase is set at 3% which equates to £8 million.  Secondly, the
Council has been advised of a reduction in the employer’s superannuation
contribution rate from 1 April 2024 which generates a net recurring saving of
£1.050 million. 
7.7 There have been several Council approved decisions which impact on the
Provisional Revenue Budgets including Council Tax premium on second
homes, non-domestic rates relief, leadership review and the Medium-Term
Page 17 of 274

Page 18

Financial Plan.  The financial impact of these decisions is £3.005 million and
£3.525 million in 2024/25 and 2025/26 respectively. 
7.8 An officer review of budgets has been undertaken to contribute towards the
delivery of balanced revenue budgets.  This exercise involved an examination
of budgets and assumptions included in existing approved revenue budgets
and has identified reductions of £2.510 million, £85,000 and £80,000 in
2024/25, 2025/26 and 2026/27 respectively.  None of these adjustments
impact on the delivery of Council priorities.  This is in addition to the
transformation reductions and savings identified at paragraph 5.17 above. 
7.9 The process for updating the 2024/25 and 2025/26 Provisional Revenue
Budgets and preparing the 2026/27 Provisional Revenue Budget included the
preparation of Executive Summaries that set out Expenditure Pressures and
Budget Reductions. 
7.10 The Executive Summaries include an assessment of the potential impact of
expenditure pressures and budget reductions against the following criteria: 
• Fairness – including the potential socio-economic impact on vulnerable
individuals and groups.
• Workforce – including information on numbers of employees affected,
vacancies, staff turnover and fixed term contracts.
• Customers – including information on the effect on all customers
/stakeholders (both external and internal).
• Equalities/Diversity – ensuring that any statutory equalities issues are
considered.
• Outcome & Performance – identifying any significant impact on the
Local Outcomes Improvement Plan and/or Service Business
Management and Improvement Plans.
• Climate Change – including positive and negative impact
7.11 The potential workforce implications identified within the Executive Summaries
include vacant posts and will be influenced by turnover. The Council’s positive
and proactive approach to workforce management is designed to mitigate the
impact on its people, including investment in skills for the future, retraining,
support to take on new job roles, career coaching and building resilience. 
7.12 Equality and Fairness Impact Assessments for individual expenditure
pressures and reductions were prepared which facilitated the preparation of a
cumulative impact assessment, circulated to all Elected Members in advance
of this special meeting of the Council. 
7.13 The Executive Summaries have been subject to scrutiny by Elected Member
Budget Review Groups which commenced in December 2023. The detailed
analysis of these expenditure pressures and reduction proposals are set out
Page 18 of 274

Page 19

in Appendix B.  Total updated expenditure pressures of £7.552 million and
total budget reductions of £21.384 million, are summarised in Table 4. 
Table 4: Expenditure Pressures and Budget Reductions 
2024/25
£m
2025/26
£m
2026/27
£m
Total
£m
Expenditure Pressures 4.084 1.169 2.299 7.552     
Budget Reductions (8.657) (4.030) (8.697) (21.384)     
7.14 In paragraph 6.11, detailed information on the financial implications of the
Local Government Settlement is included.  This includes £1.313 million of
funding that is un-hypothecated. 
7.15 The Council has also been advised of funding of £4.739 million in 2024/25
from the Scottish Government to support a Council Tax Freeze.  The Council
had previously set an indicative Council Tax increase of 3.9% for 2024/25. 
The funding offered to Perth & Kinross Council is £703,000 greater than the
indicative increase and is available to contribute towards the 2024/25
Revenue Budget.  At this time, the additional funding for the Council Tax
freeze is not included in Finance Circular 08/2023. 
7.16 ACTION: The Council is asked to approve the offer of funding from the
Scottish Government to support a Council Tax freeze in 2024/25 –
RECOMMENDATION B. 
7.17 Given the significant risks impacting on Council Services in future financial
years, it is considered prudent to create a contingency budget to contribute to
unforeseen events, including cost pressures, service needs and income
shortfalls.  To that end the 2025/26 and 2026/27 Provisional Revenue
Budgets include £1.395 million and £2.003 million respectively. At this time
the indicative budgets for these years do not fully reflect a number of
inflationary elements and these figures will be updated in the next budget
setting process. 
7.18 With all the adjustments set out above, the Council has a balanced provisional
revenue budget for 2024/25 and a limited amount of financial contingency to
address future pressures in 2025/26 and 2026/27.  
Page 19 of 274

Page 20

Table 5: 2024/25, 2025/26 & 2026/27 Provisional Revenue Budget
Adjustments 
Para 
Ref
2024/25
£m
2025/26
£m
2026/27
£m
Opening Deficit  7.2 1.954 1.551 -
Service Concessions 7.4 10.000 - -
Council Tax Reduction Scheme 7.5 1.200 - -
Staff Costs 7.6 (1.050) - 8.000
Council Decisions 7.7 (3.005) - (3.525)
Officer Review of Budgets 7.8 (2.510) (0.085) (0.080)
Expenditure Pressures 7.13 4.084 1.169 2.299
Budget Reductions 7.13 (8.657) (4.030) (8.697)
Local Government Settlement 7.14 (1.313) - -
Council Tax Freeze 7.15 (0.703) - -
Contingency 7.16  1.395 2.003     
Balanced Provisional Revenue
Budgets 
- - - 
7.19 Elected Members are reminded that the balanced Provisional Revenue
Budgets, as set out in Appendix B, are based upon the assumption that all
expenditure pressures and all reductions within the Executive Summaries
attached as Appendix C are approved.  Furthermore, this position is subject
to the current known funding available from Government. 
7.20 The 2024/25, 2025/26 and 2026/27 Provisional Revenue Budgets have been
prepared based upon the information currently available, both in terms of
financial resources and anticipated service delivery pressures. The analysis
reflects the judgement of Council officers, a focus on Council priorities and
financial principles, however, there is a significant risk that these assumptions
may require to be revised as part of the ongoing monitoring of Council
expenditure and income. 
7.21 Finally, the Council is recognised by external auditors for its prudent approach
to financial management. Given the level of uncertainty over the short to
medium term in relation to additional expenditure, reduced income, the
previously approved use of Reserves, and the unknown impact of the cost of
living on local communities and the local economy, Council is advised to
adopt a cautious and prudent approach towards the application of Reserves.
Council has already agreed the principle of not funding recurring activity from
general fund reserves. 
7.22 ACTION: The Council is asked to approve the 2024/25, 2025/26 and
2026/27 Provisional Revenue Budgets as set out in Appendix B –
RECOMMENDATION C. 
Page 20 of 274

Page 21

7.23 Elected members should be aware that when the decisions already taken on
1 March 2023 are combined with the proposals being considered in updating
provisional revenue budgets, there are budget reductions of £31.037 million
across all 2024/25, 2025/26 and 2026727 which are set out in Table 6 
Table 6: Combined Expenditure Pressures & Budget Reductions 
24/25
£m
25/26
£m
26/27 Total
£m
Pressures – 1 March 2023 5.542 3.399 - 8.941
Pressures – 28 February 2024 4.204 1.169 2.299 7.672
Total Expenditure Pressures 9.746 4.568 2.299 16.613     
Reductions – 1 March 2023 (5.140) (4.513) - (9.653)
Reductions – 28 February 2024 (8.657) (4.030) (8.697) (21.384)
Total Reductions (13.797) (8.543) (8.697) (31.037) 
7.24 Council is also advised that there may be delays implementing some
additional expenditure proposals, to allow lead in arrangements to be
established, this may result in some activity slipping into future financial years.
Any additional projects introduced through the Revenue Budget Motion /
Amendments, must reflect the Council’s priorities and approved financial
principles, including a focus on need rather than responding to demand and
be based on evidence and data. Delivery of new proposals may also require a
commensurate increase in staffing capacity which may delay implementation
as the appropriately skilled officers are recruited. 
Council Tax Collection Rate 
7.25 In previous financial years, the Council has budgeted for a Council Tax
collection rate of 98%. This target, whilst challenging, was supported by the
Council’s collection performance over recent years and represents a realistic
budgeted collection rate in “normal” times. 
7.26 Elected members receive regular updates on Council Tax collection through
reporting to the Finance & Resources Committee. 
7.27 Despite the challenges facing households, Council Tax collection is holding
up. It is therefore proposed that the collection rate of 98% is maintained for
2024/25, 2025/26 and 2026/27. It should, however, also be noted that there
remains a risk to collection levels due to the economic environment, changes
in legislation in relation to debt recovery and welfare reform. The cost-of-living
crisis along with Covid-19 and its impact on household incomes may also
continue to have a significant impact. 
7.28 It usually takes on average around six years to reach or exceed a collection
level of 98%. The Council remains committed to sustaining and improving
performance in respect of all its income recovery activities.
Page 21 of 274

Page 22

7.29 ACTION: The Council is asked to agree a Council Tax collection rate of
98% in 2024/25, 2025/26 and 2026/27 – RECOMMENDATION D. 
Council Tax Base 
7.30 The number of chargeable band D equivalent dwellings for Council Tax
purposes, the Council Tax base (after adjusting for assumed non-collection of
2%), is estimated to be as follows: 
Table 7: council tax – number of band d equivalent properties
2024/25 73,718
2025/26 74,577
2026/27 75,228 
7.31 The Council’s tax base is regularly reviewed, based upon an analysis of
recent trends, and adjusted for anticipated growth in the number of dwellings
as well as increases in the number of discounts and exempt dwellings. 
7.32 ACTION: The Council is asked to approve the Council Tax bases set out
in Table 7 above – RECOMMENDATION E. 
Council Tax Rates 
7.33 On 1 March 2023, the Council approved indicative Council Tax increases of
3.9% for 2024/25 and 2025/26.  In October 2023, the Council approved the
updated Medium Term Financial Plan (Report No. 23/72 refers) which
included an indicative increase of 3% for 2026/27 as a planning assumption. 
7.34 The 2024/25 Provisional Revenue Budget has been constructed on the basis
that the Council will accept the funding towards a Council Tax freeze. 
Therefore, it is proposed that there is no increase in Council Tax for 2024/25. 
7.35 ACTION: The Council asked to approve no increase in Council Tax for
2024/25 – RECOMMENDATION E. 
7.36 The 2025/26 and 2026/27 Provisional Revenue Budgets have been
constructed in line with previous decisions of Council i.e. 3.9% and 3%.   
7.37 However, in recognising the pressures on the Capital Budget, which are set
out in the separate report on the agenda for this special meeting of the
Council, it is proposed to add a further 1% to 2025/26 and 2026/27 which will
generate additional income of £1.047 million and £1.149 million in 2025/26
and 2026/27 respectively.  This additional income will be applied to Loan
Charges to support the Capital Budget. 
7.38 ACTION: The Council asked to approve indicative Council Tax increases
for 2025/26 and 2026/27 of 4.9% and 4% – RECOMMENDATION G. 
7.39 Beyond these financial years, it is proposed that the policy is extended so that
in future years, 1% of Council Tax income is ringfenced and applied to
Page 22 of 274

Page 23

supporting the Capital Budget to ensure delivery of key infrastructure projects
such as Destiny Bridge, Perth Museum, Perth High School and Blairgowrie
Recreation Centre as well as supporting the programmes such as roads,
bridges and IT investment.  This position will be kept under review. 
7.40 ACTION: The Council asked to approve that future Council Tax
increases allocate 1% towards loans charges which will support the
Capital Budget – RECOMMENDATION H. 
7.41 For illustrative purposes, a 1% increase in Council Tax to support the Capital
Budget means an annual increase of less than £14 which represents a weekly
increase of 27p or monthly increase of £1.17. 
7.42 In the event that future Council Tax increases are restricted or prohibited, a
corresponding amount from the Revenue Budget would be applied to Loan
Charges in order to ensure the sustainability of the Capital Budget in the
medium and longer term. 
Fees and Charges 
7.43 The proposals set out in Appendix B include the financial implications of
increases to existing levels of charges in 2024/25. Full details of
recommended charges for 2024/25 are set out in Appendix D. 
7.44 The annual review of charges considers several factors including an
assessment of previous year’s income levels, trends in user demand,
inflationary pressures, savings targets, alternative charging structures and the
potential impact on vulnerable groups. 
7.45 All fees and charges should be set in line with the approved individual
charging policy and fall into one of the following categories set out in Table 8
below. 
Table 8: Charging Categories
Charging Strategy Objective
Commercial Charges The Council aims to cover the cost of
providing the service and make a surplus.
Full Cost Recovery The Council aims to cover the cost of providing
the service from those who use it.
Subsidised The Council wishes users of the service to
contribute to the costs of providing it. This
might meet a service objective or allow
competition with other providers.
Free The Council chooses to make the service
available at no charge to meet a service
objective.
Statutory Charges are determined in line with legal
requirements. 
Page 23 of 274

Page 24

Perth and Kinross Integration Joint Board 
7.46 The Public Bodies (Joint Working) (Scotland) Act 2014 introduced joint
working with NHS (Tayside) in the form of an Integrated Joint Board (IJB) for
the delivery of health and social care across Perth and Kinross. 
7.47 The Perth and Kinross IJB has an approved Strategic Commissioning Plan for
2020-25 and a series of Strategic Delivery Plans to deliver on its objectives for
vulnerable adults who rely upon community health and social care for daily
living.  The IJB has issued directions to the Council to deliver integrated health
and social care, and, to support transformation in key priority areas such as
older people services including care at home; expansion of support and
independent living for people with a learning disability service and securing
better outcomes in community mental health.  The IJB has agreed to revise its
Strategic Commissioning Plan, to update its Strategic Needs Assessment in
2023, and finalise this in 2024. (mid-term). 
7.48 The Executive Leadership Team has continued to support the development of
a range of transformational approaches to service provision aimed at building
on best practice in health & social care provision. 
7.49 The Local Government Finance Circular 8/2023 issued on 21 December 2023
confirmed that the funding allocated to Integration Authorities should be
additional and not substitutional to each council’s 2023/24 recurring budgets. 
7.50 The 2024/25 Provisional Revenue Budget assumes the contribution to the IJB
will meet the commitment set out above in paragraph 7.49.  The Council will
pass on its full share of the funding for health and social care costs and no
inflation or savings will be allocated to the IJB contribution. 
7.51 The 2024/25 Provisional Revenue Budget assumes a pass through of in
funding to the Health & Social Care Partnership of £3.087 million as provided
for in the local government funding settlement from the Scottish Government. 
In addition, the application of £1.140 million towards the cost of the 2023/24
pay award. 
7.52 The IJB is scheduled to meet on 20 March 2024 to consider its budget for
2024-25. This budget will consider the funding received from each Partner
Body alongside the pressures which have been identified for 2024-25. The IJB
will require to make decisions in relation to savings to deliver a balanced
budget for 2024-25. Until both partners have confirmed their 2024/25
Revenue Budget, there is a risk to the delivery of the IJB Strategic Delivery
Plan. 
7.53 ACTION: The Council is requested to approve the contribution of
£87.438 million to Perth & Kinross Health & Social Care Partnership in
the 2024/25 Provisional Revenue Budget – RECOMMENDATION I. 
7.54 In addition, the Scottish Government has still to allocate £230 million of
funding nationally towards adult social care the Real Living Wage. It is
anticipated that the Council’s share of this national funding will be
Page 24 of 274

Page 25

approximately £7 million.  This funding is required to deliver the £12 per hour
minimum pay settlement for adult social care workers in commissioned
services via agreed contract uplifts. 
Composite Capital Budget 
7.55 The agenda for this special meeting of the Council includes a report on the
Strategic Investment & Capital Budget 2024/25 – 2029/30 report (Report No.
24/64 refers).  Within that report, is an update on several immediate
inflationary pressures facing the Capital Budget as well as projections on the
Capital Fund, which is being utilised to smooth the impact on the Revenue
Budget of the significant capital expenditure in the short term. 
7.56 To that end, the 2024/25 Provisional Revenue Budget includes a recurring
increase in the loan charges budget of £800,000 to support the Capital Budget
in the medium term. 
7.57 The 2025/26 & 2026/27 Provisional Revenue Budgets also include a proposal
to apply 1% of future Council Tax increases to supporting the Capital Budget. 
Budget Consultation Exercise 
7.58 Between 8 December 2023 and 7 January 2024, the Council carried out an
online consultation exercise to gauge residents’ views on budget issues and
priorities. 
7.59 Overall, there were 761 responses submitted to the on-line survey which is
consistent with previous year’s budget only exercises (in 2023/24 the exercise
was included the corporate plan consultation, and the response rate was
higher).  Appendix E provides details on the 761 responses and a report that
was shared with Budget Review Groups. 
7.60 The budget consultation has provided feedback on priorities and themes that
are important to people in Perth and Kinross.  It has also provided further
suggestions which can be used to inform the budget process and wider
engagement exercises.  The Council will continue to build on its approach to
involve communities who are seldom heard, benchmarking with Community
Planning Partners and local community groups to ensure that it understands
the issues important to them. 
Scottish Water Charges 
7.61 The Council has received notification from Scottish Water that domestic water
supply and waste water collection charges for 2024/25 will increase by 8.8%.
This results in a band D equivalent charge for water and wastewater from
Scottish Water of £546.39, an increase of £44.10, (£502.29 in 2023/24). The
split between water and wastewater is set out in Table 9 below. 
Table 9: band d water & wastewater charges for 2024/25 
Water Wastewater Total
Band D £252.90 £293.49 £546.39
Page 25 of 274

Page 26

7.62 Therefore, if the Council chooses to freeze Council Tax rates in 2023/24,
households will still see an increase in bills because of the increase in
charges from Scottish Water. 
7.63 Scottish Water charges for water and wastewater continue to be charged
using the Council Tax multiplier that was in place prior to 1 April 2017. 
8. RESERVES STRATEGY 
8.1 In accordance with the existing statutory and regulatory framework, the Head
of Finance, as Responsible Financial Officer (or “Proper Officer”), is
responsible for advising the Council on the level of Reserves it should hold. 
8.2 In determining medium term financial plans and preparing budgets, the
Council needs to consider the establishment and maintenance of Reserves in
accordance with its statutory powers. Reserves can be held for three main
purposes: 
• Working balances to help cushion the impact of uneven cash flows and
avoid unnecessary temporary borrowing – this forms part of General
Reserves. 
• A contingency to cushion the impact of unexpected events or
emergencies – this also forms part of General Reserves. 
• A means of building up funds often referred to as Earmarked Reserves,
to meet known or predicted liabilities. 
8.3 LAAP Bulletin 99 also provided guidance on the further categories of
Earmarked Reserve that the Council is permitted to hold including insurance,
unspent grants and school balances. 
8.4 The 2022/23 Audited Annual Accounts included £69.723 million of General
Fund Reserves. More details on the levels of cash backed Reserves are set
out in Appendix F. When the earmarked Reserves of £51.553 million are
removed, there was an uncommitted balance of £18.170 million which
equates to 4.0%. 
Proposals to Earmark Reserves 
8.5 Revenue Budget 2023/24 Update No 3, which was considered by the Finance
& Resources Committee on 31 January 2024 (Report No. 24/40 refers),
included the projected outturn for the Council’s 2023/24 General Fund
Revenue Budget. These projections have been further refined to recognise
several adjustments which are required in closing the Council’s 2023/24
Annual Accounts and represent material changes to the projected outturn. 
8.6 The impact of these projections on the level of balances is summarised in
Appendix G, which indicates a projected General Fund (excluding HRA)
balance of £47.042 million at 31 March 2024. Of this projected balance,
£32.905 million is earmarked for the specific purposes set out in Table 11
below at paragraph 8.8 with a projected uncommitted balance of £14.137
million.
Page 26 of 274

Page 27

8.7 There remain some areas of uncertainty in relation to the projected level of
balances at 31 March 2024 including the final impact of weather-related
events or additional grant income. 
8.8 Based on the Council’s existing financial and policy commitments and the
work undertaken in preparing the Provisional Revenue Budgets, it is proposed
that the amounts included in Table 10 be earmarked against the projected
General Fund balance. 
Table 10: Earmarked General Fund Balances 
31.3.24 31.3.23  
£'000 £'000      
Projected General Fund Balance - 31 March 2024 (Per Appendix G) 47,042 69,723
Less: Proposed Amounts Earmarked Against Balances:    
Transformation and Workforce Management (6,952) (9,530)
Revenue Grants (6,292) (15,947)
Developer Contributions (6,194) (5,540)
Affordable Housing (4,241) (4,353)
School Estate (1,900) (2,063)
Anti-Poverty Measures (1,847) (2,666)
Car Parking (1,512) (1,512)
Culture (1,081) (1,172)
Non-Recurring Pressures c/f from 2023/24 (703) 0
Modern Apprentices / Graduate Trainees (340) (340)
School Counsellors (329) (556)
Services for Children, Young People and Families (281) (2,139)
Property Maintenance (262) (271)
Devolved School Management Balances (239) (722)
Works Maintenance (200) (400)
Community Resilience (175) 0
Salix (100) (113)
PH2O (62) (212)
Local Action Partnerships (60) (90)
Local Government Elections (53) 0
Community Investment Fund (38) (89)
Ventilation measures (24) (114)
Financial Assistance (20) 0
Non-Recurring Pressures c/f from 2022/23 0 (1,699)
Decant schools 0 (700)
Perth & Kinross Offer 0 (252)
Grounds maintenance 0 (60)
Financial Insecurity 0 (680)
Climate Change 0 (153)
World cycling 0 (180)
Total earmarked reserves (32,905) (51,553)      
Revised Projected Uncommitted Balance at 31 March 2024 14,137 18,170
Page 27 of 274

Page 28

8.9 The balances identified in Table 11 above and described in more detail in
Appendix H will be monitored as part of the revenue monitoring process. Any
proposals to make use of the balances will be subject to approval by either the
Finance & Resources Committee or Council. 
8.10 Within the earmarked Reserve for Transformation and Workforce
Management, £800,000 has been allocated to support the transformation of
Care at Home and Reablement within the Health & Social Care Partnership.
This investment will mitigate future years’ cost pressures. This funding will be
drawn down throughout 2024/25 as required following approval by the
Finance & Resources Committee. 
8.11 ACTION: The Council is asked to maintain a prudent approach to the
application of reserves and earmark the General Fund Balances
identified in Table 11 above and Appendix H – RECOMMENDATION J. 
Proposed Approach to Managing Unearmarked General Fund Reserves 
8.12 To assess the adequacy of unearmarked General Fund Reserves, it is
necessary to take account of the strategic, operational and financial risks
facing the Council, which are set out in Section 9 of this report. 
8.13 In addition, Councils are expected to retain the equivalent of 0.2% of their
annual Net Revenue Budget to deal with unforeseen emergencies (£797,780
in 2023/24 for Perth & Kinross Council) before being eligible for support
through the Bellwin Scheme. 
8.14 Taking account of all the risks and historical experience in Perth and Kinross
since 1996, it is recommended that the targeted level of uncommitted non-
HRA General Fund Reserves continues to be in the range of 2% to 4% of the
Council’s Net Revenue Budget in the medium term. 
8.15 Based on the Net Provisional Revenue Budget for 2024/25 of £462.700
million as detailed in Appendix B, this would mean a level of uncommitted
Reserves of between approximately £9.254 million and £18.508 million for
2024/25. 
8.16 The Council has targeted a level of uncommitted Reserves between 2% and
4% range for several years. Whilst this range is still considered to be
appropriate, it should be noted that the level of risk involved in managing the
Council’s Revenue Budget is significant. There is currently no confirmation of
the Council’s Scottish Government funding beyond 2024/25 and it is
anticipated that Council services will continue to operate in a challenging
financial environment in future years. 
8.17 Based on the level of earmarked Reserves set out in Table 11 above, the
level of unearmarked Reserves is £14.137 million which equates to 3.1% 
8.18 ACTION: The Council is asked to approve that uncommitted Reserves
are maintained at a minimum of 2% to 4% of the 2024/25 Net Revenue
Page 28 of 274

Page 29

Budget which equates to £9.254 million to 18.508 million –
RECOMMENDATION K. 
8.19 In the event that any use of General Fund Reserves is made in determining
the 2024/25, 2025/26 or 2026/27 Revenue Budgets, this should only be done
on the basis of a sustainable strategy, which ensures that future years’
Revenue Budgets are not dependent upon the continuing use of Reserves. 
8.20 Appendix I to the report shows the contributions to and from Reserves
recommended in setting the Provisional Revenue Budget for 2024/25 and
anticipated in 2025/26 and 2026/27. 
8.21 The Council holds several other cash backed Reserves including the Capital
Statutory Fund, Insurance Fund, Capital Fund and Capital Grants Unapplied
Fund which are further detailed in Appendix F. 
9. RISK ASSESSMENT 
9.1 Determining the Revenue Budget and Reserves Strategy requires
consideration of the strategic, operational and financial risks potentially facing
the Council. The General Fund Reserves Strategy is integral to supporting the
Council’s approach to the management of financial risk. Both the uncertainty
of future events and resource constraints make it impractical to mitigate
against all potential risks. In developing its medium-term financial plan, the
Council must also be aware of the sustainability of its expenditure proposals.
Significant risks, which are of relevance are outlined below. 
9.2 Council will be kept up to date on the impact of these risks through revenue
monitoring reports to the Finance & Resources Committee and budget
updates to Council. 
Local Government Funding Beyond 2024/25 
9.3 The Council only received a one-year financial settlement for 2024/25 in
December 2023. It is very difficult to estimate Scottish Government future
funding scenarios at individual Council level. The magnitude of any potential
future funding reduction will be influenced by many aspects of the wider
economic climate and UK and Scottish Government policies.  The financial
challenges facing the Scottish Government are known and this may have an
impact on future levels of funding available to Councils. 
9.4 Given the levels of inflation being experienced (both general and specific), the
potential for further real terms reductions in funding beyond financial year
2024/25 is considered to represent a risk in the management of the budget
over the medium term. 
9.5 The potential for real terms reductions in funding is compounded over the
medium term at a time of rising need and demand for Council services. 
9.6 At this time, there is also no information on any conditions which may be
attached to future local government finance settlements.  For 2024/25,
Page 29 of 274

Page 30

Councils have been advised of financial penalties if they fail to maintain
teacher and school support staff numbers.  The Executive Summaries set out
in Appendix B comply with this requirement. 
9.7 The 2025/26 and 2026/27 Provisional Revenue Budgets also assume that
there are no future restrictions on increases in Council Tax levels. 
9.8 Following the devolvement of a number of taxes to the Scottish Government,
under the terms of the Scotland Acts, the actual level of funding available to
the public sector is more directly linked to the performance of the Scottish
economy. Income from devolved taxation will be dependent upon the relative
performance of the Scottish economy. 
9.9 Whilst the Scottish Government has provided funding information for 2024/25
only, it remains critical that the Council continues to plan over the medium
term, to allow sufficient lead in time to identify and deliver the savings that are
likely to be necessary in future years. By continuing to plan for the medium
term, the Council provides authority for officers to roll out the programme of
significant change outlined in the Transformation & Change Strategy. 
9.10 Finally, as set out in the Council’s response to the Scottish Government
consultation on a National Care Service (Report No. 21/185 refers), there is
the potential for the creation of a National Care Service to have an impact
upon the Council’s future budget. 
Pay Award Assumptions 
9.11 The 2024/25, 2025/26 and 2026/27 Provisional Revenue Budgets include a
budgeted pay award of 3% for all staff groups.   
9.12 Pay claims for 2024/25 only have been received from all unions that far
exceed the Council’s budgeted provision.  There is therefore a significant risk
that the budgeted provision is insufficient. 
9.13 Each movement of 1% on pay award results in an approximately £2.250
million increase or reduction in the cost to the Council. 
9.14 The negotiations for the 2024/25 pay awards will likely continue beyond 28
February 2024 for all staff groups. Therefore, this represents a significant risk
to the base budget (2024/25) and for all financial years going forward. 
Teachers’ Superannuation – Employers’ Contributions 
9.15 The Council has been advised that employers’ superannuation contributions
for teachers will rise from 26% to 23%, a rise of 13%, from 1 April 2024.  This
will mean additional costs of approximately £2 million.  It is assumed that the
funding for this will flow through from the UK Government to the Scottish
Government through Barnett Consequentials, and then to Councils during
2024/25.  
Page 30 of 274

Page 31

Inflation 
9.16 There is a risk that levels of Service specific inflation exceed budgeted
provisions including energy and construction and that levels of general
inflation cannot be contained within existing resources as is currently
assumed within the Provisional Revenue Budgets. 
9.17 Future increases in the National Living Wage, pressure to enhance wage
rates paid by service providers and suppliers and global uncertainty may also
create inflationary pressures. 
Cost of Living 
9.18 Undoubtedly, the cost of living will have a significant impact on Council
resources over the medium term. It is likely that the Council will continue to
incur additional expenditure as the cost-of-living response continues as well
as seeing further pressure on income streams from both Council Tax and fees
& charges due to the impact on local citizens and businesses. 
Arms-Length External Organisations 
9.19 All three of the Council’s Arms-Length External Organisations, Live Active
Leisure, Culture Perth and Kinross and Perth Theatre & Concert Hall, are
operating under challenging financial circumstances. 
9.20 Rising costs (both revenue and capital) are placing further strain on ALEO
resources.  A review of ALEOs is being undertaken within the Transformation
and Change Programme. 
Tayside Contracts 
9.21 There is a risk that levels of inflation exceed budgeted provisions for Tayside
Contracts covering construction, janitorial, catering and cleaning activities.
Furthermore, with Tayside Contracts bound by national pay award
negotiations there is a risk that, similar to 2023/24, future pay offers are
‘bottom loaded’ which have a disproportionately high effect on lower paid
employees and therefore significantly increased costs in relative percentage
terms (92% of Tayside Contracts staff earn below £25k per annum compared
to the Scottish Council’s average of 55%). 
9.22 Tayside Contracts continue to seek ways to improve efficiency and
effectiveness in their day-to-day operations to mitigate the impact of cost
increases with a Change Plan and programme of Transformation being
developed over the short to medium term. There is a risk, however, that these
interventions alone will not be sufficient to accommodate all cost increases
and as such service reductions may be required going forward.  
Page 31 of 274

Page 32

Number of Band D Properties 
9.23 The 2023/24, 2024/25 & 2025/26 Provisional Revenue Budgets assume
growth in the number of Band D equivalent properties consistent with the
Medium-Term Financial Plan and is based on levels of growth currently being
experienced. If the levels of growth in the number of properties do not
continue, there is a risk to the budgeted level of Council Tax income. 
Current Economic Climate 
9.24 There is a risk that both the Council’s capacity to generate income, and the
expenditure it incurs in meeting demand for its Services, may be less
predictable in the current volatile economic climate. 
9.25 In terms of income generation, there is a continued risk that Council Tax
collection levels, commercial rental income and other areas of income
generated by the Council may be further affected. 
9.26 The economic climate may also increase demand for, and expenditure on
Council services. This risk will require to be managed within the Council’s
available resources. 
Climate Change 
9.27 On 15 December 2021, the Council approved its Climate Change Strategy
and Action Plan (Report No. 21/245 refers). 
9.28 Legislation has been introduced by the Scottish Government that will aim to
ensure Scotland reaches net zero greenhouse gas emissions by 2045. There
are also a range of challenging intermediate targets and a further possibility
that these targets will be accelerated by legislation. These requirements will
have implications for both revenue costs and capital expenditure. 
9.29 As the Council strives to decarbonise, this will undoubtedly mean significant
additional investment will be required. However, it must also be noted that
there are major, current and proposed, national funding sources available,
and the Council must ensure it is in a position to fully capitalise on these. 
2024/25, 2025/26 & 2026/27 Revenue Budgets 
9.30 Council has previously been briefed on the current challenges in the
construction sector and as widely reported, supply chain pressures are
emerging across all sectors of the economy. There is accordingly a risk that
the assumptions supporting expenditure pressures within future year Revenue
Budgets vary significantly with a consequential impact upon the budget. 
9.31 There are several areas of activity that carry a specific risk including child
protection, weather events and income generation. 
Page 32 of 274

Page 33

9.32 Furthermore, the 2024/25, 2025/26 & 2026/27 Revenue Budgets are
constructed on the basis that approved savings are delivered. There remains
a risk that due to capacity issues or changes in demand for services, these
savings require to be delayed or may no longer be deliverable. 
9.33 There is also a risk that the delivery of services continues to be impacted by
the ability of the Council to recruit and retain staff with the skills required to
maintain high standards of performance. Recruitment challenges continue to
be an ongoing issue in many service areas with the pressures of continuing
demands on the workforce and competition from other employers contributing
to this challenge. 
Implications of Capital Budget 
9.34 The Council has an established policy of drawing down the Capital Fund to
support capital expenditure. As the Capital Fund reduces, resources will have
to be redirected from the Revenue Budget to support the loan repayments
over the short to medium term. 
Severe Weather 
9.35 There is a risk that, as has been the case in previous years, the Council
incurs further significant levels of expenditure on severe weather. Table 11
sets out projected or final outturns on Winter Maintenance over the last ten
years. The total net contribution from unearmarked Reserves over the last
decade is £4.142 million. Officers continue to support the use of Reserves to
address these potential pressures as an allocation of additional funding in the
Revenue Budget would require further reductions in budgets, service delivery
and potential staffing in other areas, when there is no certainty on the level of
spend to be incurred. 
Table 11: Winter Maintenance Final Over / Under Spend
2023/24 Projected over spend of £500,000
2022/23 Over spend of £759,000
2021/22 Over spend of £225,000
2020/21 Over spend £1.024 million
2019/20  Overspend £648,000
2018/19  Underspend £143,000
2017/18 Over spend of £1.350 million
2016/17 Underspend £540,000
2015/16 Over spend £59,000
2014/15 Over spend £260,000 
9.36 Council will be kept up to date with developments through the revenue and
capital monitoring updates to Finance and Resources Committee, which will
be provided throughout the coming financial year.  
Page 33 of 274

Page 34

10. CONCLUSIONS 
10.1 Despite the challenges the Council faces, its workforce continues to deliver
high quality services to the people of Perth and Kinross on a daily basis
making a real difference to the lives of our residents. In common with all
Scottish local authorities and the wider public sector, Perth & Kinross Council
continues to anticipate a period of financial constraint due to growing costs at
the same time as increased demand for services. 
10.2 The cost-of-living crisis has given rise to significant financial pressure on the
Council’s Revenue Budget and the long-term impact upon service demand;
service delivery and the Council’s ability to generate and collect income will
take some time to establish. 
10.3 The wider economic situation and consequential impact on the cost of living
will further exacerbate the financial and wider challenges the Council will
experience over the short and medium term. 
10.4 The Council continues to take proactive measures to enable it to address
these challenges from a robust financial position and continues to develop
and strengthen its arrangements for financial and resource management. 
10.5 The Council remains committed to modernising and improving the efficiency
of its services. This report reinforces the Council’s commitment to the
delivering the best possible services in the context of meeting challenging
savings targets which requires the engagement of the Council’s workforce;
Elected Members; Community Planning Partners and the communities which
it serves. 
Author(s)
Name  Designation Contact Details
Scott Walker  Strategic Lead – Finance
& Business Support 
chxfinance@pkc.gov.uk 
Carole Hendry Performance & Business
Support Manager 
Sara Whitnall Executive Support
Manager 
Approved
Name  Designation Date
Clare Mailer  Director – Strategy,
People & Resources
21 February 2024
Page 34 of 274

Page 35

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2028 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation. They are as
follows: 
• Tackling poverty
• Tackling climate change and supporting sustainable places
• Developing a resilient, stronger and greener local economy
• Enabling our children and young people to achieve their full potential
• Protecting and caring for our most vulnerable people
• Supporting and promoting physical and mental wellbeing
• Working in partnership with communities 
1.2 This report relates to all these objectives. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than
those reported within the body of the main report. 
Page 35 of 274

Page 36

Workforce 
2.2 There are no direct workforce implications arising from this report other than
those reported within the body of the main report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
2.4 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups. Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
2.5 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act. However, no action is required as the Act does not apply to the matters
presented in this report. 
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council must discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions. 
3.6 The information contained within this report has been considered under the
Act. However, no action is required as the Act does not apply to the matters
presented in this report. 
Page 36 of 274

Page 37

4. Consultation 
Internal 
4.1 The Executive Leadership Team has been consulted in the preparation of this
report. 
2. BACKGROUND PAPERS 
2.1 No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3. APPENDICES 
Appendix A –  Overall Transformation and Change Programme Status 
Appendix B 2024/25, 2025/26 & 2026/27 Provisional Revenue
Budgets 
Appendix C –  Executive Summaries 
Appendix D – 2024/25 Fees & Charges 
Appendix E –  Budget Consultation Summary Report 
Appendix F –  Summary of Council Cash Backed Reserves 31 March
2023 and Projected to 31 March 2024 
Appendix G –  Projected General Fund Balance at 31 March 2024 (excl
HRA) 
Appendix H – Summary of Earmarked Reserves at 31 March 2024 
Appendix I –  Summary of the Projected Use of General Fund Revenue
Balances 2024/25, 2025/26 & 2026/27 
Page 37 of 274

Page 38

Page 38 of 274

Page 39

Overall Transformation and Change Programme Status 
Phase Transformation & Change Programme  Initiation  Scope Option
Appraisal 
Operating
Model
Developed 
Transition
Plan
Developed 
Improvement
Plan
Developed 
Transition to
Operating
Model
Complete
Improvement
Plan
Delivered
Project
Delivered 
Key
Milestone
Status 
Phase 1 Consolidation            C Stage 
Finance C C C C C C C O N/S   complete 
Property  C C C C C C C O N/S  O Ongoing 
Strategic Planning & Performance  C C C C C O N/S N/S N/S  N/S Not started 
Professional & Business Support – Phase 1 C C C C C C C O N/S  N/A Not applicable 
Community Engagement  C C C C C O N/S N/S N/S   
Customer Services  C C C C C O O O N/S   
Press & Communications  C C C C C C C O N/S   
Commissioning & Procurement  C C C C C O O N/S N/S   
Human Resources & Organisational
Development 
C C C C C C C O N/S   
Phase 2 Existing and New Projects             
Additional Support Needs  C C C N/A N/A O N/A N/S N/S   
Whole Family Wellbeing  C C C N/A N/A O N/A N/S N/S   
ALEOs  C C C N/A N/A N/S N/A N/S N/S   
Transport  C C O N/A N/A N/S N/A N/S N/S   
Professional & Business Support – Phase 2 C O N/S N/S N/S N/S N/S N/S N/S   
Multi-Disciplinary Locality Working  C C O N/A N/A N/S N/A N/S N/S   
Working Smarter  C C O N/A N/A N/S N/A N/S N/S   
3
Page 39 of 274

Page 40

Page 40 of 274

Page 41

APPENDIX B
PROVISIONAL REVENUE BUDGET
2024/25 2025/26 2026/27
£000 £000 £000
Economy, Place & Learning 258,858 254,726 248,448
Strategy, People & Resources 90,177 86,267 86,910
Sub-Total: Service Budgets 349,035 340,993 335,358
Corporate Budgets
Health & Social Care Partnership 87,438 87,433 87,433
Contribution to Valuation Joint Board 1,328 1,328 1,328
Capital Financing Costs 16,478 18,066 19,756
Interest on Revenue Balances (5,411) (4,474) (3,513)
Contribution to Capital Fund 6,710 5,869 4,908
Contribution to Insurance fund 200 1,000 1,000
Tayside Contracts Surplus (550) (550) (550)
Support Service External Income (2,238) (2,323) (2,403)
Contribution to Tayside pension fund 1,655 1,655 1,655
Discretionary Relief 1,104 1,104 1,104
Apprenticeship Levy 956 956 956
Council Tax Reduction Scheme 7,400 7,400 7,400
Corporate Savings (Leadership / Procurement) (1,405) (2,405) (3,530)
Pay 0 7,250 15,250
Contingency 0 1,395 3,397
Sub-Total: Corporate Budgets 113,665 123,704 134,191
Net Expenditure (General Fund) 462,700 464,697 469,549
Financed By:
Council Tax (103,477) (109,812) (115,202)
Council Tax Second Home / Long Term Empty
Properties (3,300) (3,300) (3,300)
Council Tax Single Person Discount (300) (300) (300)
Total Revenue Funding (343,077) (343,077) (343,077)
Capital Grants (1,600) (1,600) (1,600)
Balances (3,946) 392 930
Service Concession Scheme (7,000) (7,000) (7,000)
Balanced Budget 0 0 0
3
Page 41 of 274

Page 42

Page 42 of 274

Page 43

Pressures
£'000
Reductions
£'000 FTE
Pressures
£'000
Reductions
£'000 FTE
Pressures
£'000
Reductions
£'000 FTE
Tackling poverty 38 88 0.0 -19 67 1.0 32 0 0.0
Tackling climate change and supporting sustainable places 0 50 0.0 0 0 0.0 0 100 3.5
Developing a resilient, stronger and greener local economy 30 791 1.0 15 200 0.0 0 24 0.0
Enabling our children and young people to achieve their full potential 3,536 2,971 9.0 550 607 11.4 1,178 5,128 7.5
Protecting and caring for our most vulnerable people 0 0 0.0 0 714 5.9 0 849 0.0
Supporting and promoting physical and mental wellbeing 0 0 0.0 0 0 0.0 0 331 0.0
Working in partnership with communities -265 1,948 7.0 -200 1,170 18.0 590 671 8.0
Organised to Deliver / Transformation 572 2,174 1.8 803 1,107 3.3 404 1,485 12.0
Operational Management 173 635 0.8 20 165 1.0 95 109 0.0
Totals 4,084 8,657 19.6 1,169 4,030 40.6 2,299 8,697 31.0
2024/25 2025/26 2026/27
3
Page 43 of 274

Page 44

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
EXPENDITURE PRESSURES - Tackling Poverty 24/25 25/26 26/27
£'000 £'000 £'000
1 Operations - Living Wage 38 (19) 32
Environment
&
Infrastructure
Inflationary Pressures - Provision for impact of National Living Wage (mandatory) on agency contracts and
Foundation Living Wage (discretionary but supports the Council's commitment as a Living Wage Employer). 
Rates assumed are 8.8%, 3% and 3%.                                                                                                                                                                        
TOTAL 38 (19) 32
Pressure
Page 44 of 274

Page 45

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
EXPENDITURE PRESSURES - Tackling climate change and supporting sustainable places 24/25 25/26 26/27
£'000 £'000 £'000
Intentionally blank
TOTAL 0 0 0
Pressure
Page 45 of 274

Page 46

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
EXPENDITURE PRESSURES - Developing a resilient, stronger and greener local economy 24/25 25/26 26/27
£'000 £'000 £'000
1 Electric Vehicle Chargers - Energy Pressure (35) 15 0
Economy,
Development
&
Planning
Provision for energy price inflation at 21%, 3% and 0% (no assumption of rate increase can be made for
26/27 at this time due to market volatility). The current energy budget is higher than the projected outturn for
23/24 and as such all of the assumed 21% increase in 24/25 can now be accommodated within the base
budget with a further reduction of £35,000 within the pressure.
2 Electric Vehicle Chargers - Maintenance 65 0 0
Economy,
Development
&
Planning
Provision for EV charger maintenance for which there is currently no budget.
TOTAL 30 15 0
Pressure
Page 46 of 274

Page 47

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
EXPENDITURE PRESSURES - Enabling our children and young people to achieve their full potential 24/25 25/26 26/27
£'000 £'000 £'000
1 Investment in Learning (IIL) and Bertha Park High School Unitary Charge 113 0 488
Property IIL and Bertha Park High School Unitary Charge inflation - Retail Price Index (RPI) - Estimate for January
2024 -Increase of 0.8% to 4.8% (Prev agreed 24/25 4%, 25/26 - 3%).Assume 26/27 2.0%.
2 Tayside Contracts 1,812 310 405
Property Inflation increase in 2023/24 from staff pay awards £567k from Tayside Contracts and food inflation costs
offset by reduction on assumption from 4% to 3.5%.
Costs inflation for Cleaning/Janitorial and School meal Provisions . 26/27 2%. (Prev agreed 24/25 4%; 25/26
3%).
3 School aged Childcare 108 0 0
Education &
Learning
Pressure due to reduced attendance at Kids Clubs post covid in part due to working from home
arrangements. Possibly offset by proposed savings by increase in charges.
4 Slippage in Schools 386 0 0
Education &
Learning
Expenditure pressure to reduce staff slippage target in Primary and Secondary school settings to 3% as the
higher targets are unable to be met.
5 Minibus 0 39 0
Education &
Learning
Expenditure pressure due to increased costs of Minibuses used by schools, LAL , CPK and community
groups.
6 Sustainable rate for Partner Providers 140 0 0
Education &
Learning
Further inflationary increase of 2.5% for 24/25, assumes funding from Early Learning & Childcare budget
allocation from Scottish Government. Previously agreed 24/25 2.5% & 25/26 2.5% Offset by saving to reduce
available Early Years Expansion funding. 
Pressure
Page 47 of 274

Page 48

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
EXPENDITURE PRESSURES - Enabling our children and young people to achieve their full potential 24/25 25/26 26/27
£'000 £'000 £'000
Pressure
7 Transport Costs for Instrumental Music Service Central Groups 20 0 0
Education &
Learning
Funding required following decision to remove charges for transport to Central Groups including backdating
inflationary increase.
8 Young People with emotional and behavioural difficulties in Residential Care 607 177 150
Children 
Families &
Justice
Budget currently allows for 11 placements of young people with emotional and behavioural difficulties in
Residential Care . Current number of placements is 15 (funded from temporary additional funding) with
planned reduction to 11. Pressure is to allow for provision of a further 3 placements.  Inflationary increase of
2.5% included in 26/27. Previously agreed inflationary pressure of 24/25 5% & 25/26 2.5%. Offset by
proposed saving to remove provision for places over above the known future requirement.
9 Self Directed Support 105 0 0
Children 
Families &
Justice
PKC pay rates must increase inline with SG Guidance and living wage causing expenditure pressure - offset
by saving proposal assuming uplift will be fully funded by Scottish Government.
10 Support for Care Experienced Young people 100 15 15
Children 
Families &
Justice
Continuing care, DWP, Rent etc. Inflationary pressures have had an impact on this budget particularly rents.
11 Central Children Families and Justice 80 5 0
Children 
Families &
Justice
Legal, Translation costs and SLA expenditure pressure due to inflation.
12 Client travel 65 4 5
Children 
Families &
Justice
Expenditure pressure on travel for clients to attend meetings due to increased costs.
Page 48 of 274

Page 49

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
EXPENDITURE PRESSURES - Enabling our children and young people to achieve their full potential 24/25 25/26 26/27
£'000 £'000 £'000
Pressure
13 Foster Carer and Kinship Carer Fee Payment 0 0 115
Children 
Families &
Justice
Expenditure pressure for Kinship Care based on current requirement in 2026/27 beyond budget as no
confirmation of funding for uplift to agreed national rates in future years. Inflation pressures (Previously
agreed 24/25 2.8%; 25/26 2.4%) .Assume 26/27 2.5%. Offset by saving which is assuming funding from the
Scottish Government for inflationary uplift. 
TOTAL 3,536 550 1,178
Page 49 of 274

Page 50

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
EXPENDITURE PRESSURES - Protecting and caring for our most vulnerable people 24/25 25/26 26/27
£'000 £'000 £'000
Intentionally blank
TOTAL 0 0 0
Pressure
Page 50 of 274

Page 51

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
EXPENDITURE PRESSURES - Supporting and promoting physical and mental wellbeing 24/25 25/26 26/27
£'000 £'000 £'000
Intentionally blank
TOTAL 0 0 0
Pressure
Page 51 of 274

Page 52

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
EXPENDITURE PRESSURES - Working in partnership with communities 24/25 25/26 26/27
£'000 £'000 £'000
1 Community Greenspace - Contract Inflation (5) (5) 25
Housing
&
Communities
Provision for contract inflation on community greenspace planned and reactive maintenance contracts. 
Inflation rates assumed are 3.5%, 2.75% and 2%.
2 Roads, Structures, Traffic & Network, Street Lighting - Contract Inflation (45) (30) 60
Environment &
Infrastructure
Provision for contract inflation across planned and reactive maintenance contracts. Inflation rates assumed
are 3.5%, 2.75% and 2%.
3 Winter Maintenance - Contract Inflation (20) (10) 85
Environment &
Infrastructure
Provision for contract inflation.  Inflation rates assumed are 3.5%, 2.75% and 2%.
4 Operations Fuel 20 10 30
Environment &
Infrastructure
Provision for contract price increase for fuel across all activities.  Inflation rates assumed are 3.5%, 2.75%
and 2%.
5 Street Lighting, Illuminated Signs and Traffic Signals - Net Energy Pressure (300) (235) 0
Environment &
Infrastructure
Provision for energy price inflation at  7%, -17%, 2% . This is net of increased loan charges arising from the
LED and column replacement programme.
6 Waste Disposal - Contract Inflation 35 60 140
Environment &
Infrastructure
Provision for contract inflation.  Inflation rates assumed are 3.5%, 2.75% and 2% in line with Medium Term
Financial Plan.
7 Public Transport Tendered Services - Contract Inflation 50 5 155
Housing
&
Communities
Provision for contract inflation on subsidised local bus service contracts. Inflation rates assumed are 6.8%
(includes a shortfall of £70k in 23/24 for Services 55, 202 and 615) , 5% and 5%.
Pressure
Page 52 of 274

Page 53

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
EXPENDITURE PRESSURES - Working in partnership with communities 24/25 25/26 26/27
£'000 £'000 £'000
Pressure
8 Parking Services 0 5 95
Housing
&
Communities
Provision for inflation on operating costs including maintenance of car parks and ticket machines, park and
ride services, multi storey car park and investment in car parking infrastructure. Costs to be covered by an
increase in parking charges. Inflation rates assumed are 3.5%, 2.75% and 2%.
TOTAL (265) (200) 590
Page 53 of 274

Page 54

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
EXPENDITURE PRESSURES - Organised to Deliver / Transformation 24/25 25/26 26/27
£'000 £'000 £'000
1 Property Maintenance 0 0 250
Property Inflationary increases on contracts and portfolio condition demands. This is an inflationary increase of 20% in
23/24 (24/25 5%; 25/26 5% & 26/27 4.5% ).
2 Non Domestic Rates (315) 3 154
Property Provision for increases to rates. Inflationary increases assumed as nil for 24/25 then 2.75% and 2%.
3 External Audit Fee 62 0 0
Finance &
Business
Support
The External audit fee has increased steadily year on year. The 23/24 projection is £330k increasing to £347k
for 24/25.
4 Insurance Premiums increase 0 800 0
Finance &
Business
Support
The insurance market has seen significant movement over the last few years. The impact for Insurance and
Claims handling is that in financial year 2020/2021 the cost of these services was £990k. It is projected to
increase to over £1.9m by financial year 2024/2025 which is a 95% uplift from 2020/21.This is the net
pressure after recharges to the Housing Revenue Account.
5 Corporate Health & Safety 25 0 0
Strategic
Planning,
People &
Performance
Recharge to ALEOs for provision of Health and Safety support no longer recoverable as being managed in-
house.
Pressure
Page 54 of 274

Page 55

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
EXPENDITURE PRESSURES - Organised to Deliver / Transformation 24/25 25/26 26/27
£'000 £'000 £'000
Pressure
6 Loan Charges 800 0 0
Finance &
Business
Support
Increase in loans charges budget to contribute towards the financing of the Capital Budget
TOTAL 572 803 404
Page 55 of 274

Page 56

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Tackling poverty 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
1 Period Dignity 35 0 0
Strategic
Planning,
People &
Performance
Underspend projected in 2023/24 £35,000 and 2022/23 was £13,000.  Supply
of free period products in locations across Perth and Kinross.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: Negative impact on individuals experiencing socio economic
disadvantage
Workforce: No staffing implications.
Customer: Impact on individuals accessing free period products in locations
across PKC as potentially less products available
Equalities/Diversity:  This may impact on vulnerable and low income
individuals and families accessing Period Dignity products
Outcome and Performance: This is statutory provision which PKC reports to
SG on an annual basis
Climate Change: No significant impact.
Reduction / Income FTE
Page 56 of 274

Page 57

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Tackling poverty 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
2 Full removal of Food Initiative Budget 53 67 Y
Housing
&
Communities
1. Reduced capacity in this area.
2. Completely remove food grant payments to community food projects
£53,000.
3. Remove funding towards NHS Food Worker £27,000.                                           
The grant funding provide financial and capacity building support to community
food projects, including Perth Foodbank who provide emergency food and
advice to those negatively impacted by the cost of living crisis and experiencing
food insecurity.  The Good Food Fund supported 37 groups in 22/23 and 22
groups in 23/24.  The NHS Public Health Practitioner in Nutrition post delivers
community cookit programmes in the community, helping people develop their
skills and confidence to cook healthy nutritious food on a budget and has so far
trained 19 people from a variety of community and public service organisations.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: Negatively impact on people experiencing socio economic
disadvantages and inequalities and relying on emergency food supplies or
access to affordable food.
Workforce:  Yes
Customer: Families and individuals experiencing food insecurity
Equalities/Diversity:  As above
Outcome and Performance: Impacts on our ability to deliver corporate
objective of tackling poverty.
Climate Change: Community food projects also work to reduce food waste,
recycling food and working with local supermarkets to provide excess food to
those who need it most.
Page 57 of 274

Page 58

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Tackling poverty 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
TOTAL 88 67 0 0.0 1.0 0.0
Page 58 of 274

Page 59

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Tackling climate change and supporting sustainable places 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
1 Grounds Maintenance 0 0 100 3.5
Environment
&
Infrastructure
A rapid and significant increase in the unmaintained ‘no mow’ areas undertaken as part of the
biodiversity and climate change trials, on approx. 80% of sites with 54% of grass not being
regularly mown.  Most smaller amenity grass areas would only have their edges cut whilst
only the larger areas in the main parks, sports pitches and play areas, would be cut
fortnightly.  Leaf clearance and shrub bed weed control and pruning would be reduced by
approx. 25% which will lead to a gradual increase in overgrowth and weed infestation in some
areas.  Litter collection will not be undertaken on ‘no mow’ areas.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic Disadvantage:
Significant decline in the appearance and functionality of most smaller amenity greenspaces
close to homes leading to a general decline in community pride and confidence particularly in
areas where people have less opportunity to help themselves.
Reduction / Income FTE
Page 59 of 274

Page 60

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Tackling climate change and supporting sustainable places 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
Workforce:  Staffing reduction of 3.5FTE of 70FTE. Also impact on agency staff. Limited
redeployment and/or retraining opportunities for some of the Council's lowest paid members
of staff.  
Customer: General decline in community pride and confidence particularly in areas where
people have less opportunity to help themselves.  Overall appearance and perception of
neglect in many areas leading to possible increases in anti-social behaviour, a reduction of
community use and active recreation through spaces not being fit for purpose and an
increase in complaints.
Equalities/Diversity: Potentially greater impact on people and communities that rely on using
their free to access local greenspaces for physical and mental well-being. There would be a
disproportionate effect in areas of high population density.
Outcome and Performance: Reduction in the function and quality of approx. 60% of public
open spaces through reduced routine maintenance.  Some areas may be of benefit to
biodiversity through reduced maintenance.  There will be significantly less capacity to support
large corporate events and respond to incidents like flooding.
Climate Change: Managed reductions to maintenance and community involvement could
lead to improved biodiversity and climate change benefits and resilience through less use of
chemicals and fossil fuels. 
Page 60 of 274

Page 61

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Tackling climate change and supporting sustainable places 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
2 Planning & Development - Climate Change 50 0 0
Economy,
Development
&
Planning
Reduction in payments to other bodies £50,000. These specific activities can be delivered in
an alternative way:
Tree Planting - £20,000
Energy Consultancy - £10,000
Energy Efficiency Advice - £20,000
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic Disadvantage: No
significant impact
Workforce: No significant impact identified.
Customer: .No significant impact
Equalities/Diversity: No significant impact
Outcome and Performance: No significant impact
Climate Change: No significant impact as activity will be funded from other sources e.g.
UKSPF
TOTAL 50 0 100 0.0 0.0 3.5
Page 61 of 274

Page 62

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Developing a resilient, stronger and greener local economy 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
1 Removal of funding for mobile toilets 26 0 0
Environment
&
Infrastructure
Cessation of funding for the provision of mobile toilets at community and public
events requiring community organisations to fund any provision themselves
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified.
Workforce:   No significant impact identified.
Customer: Would impact on community groups which hold events.
Equalities / Diversity: No significant impact identified.
Outcome & Performance: Reduced support to Community Groups. 
Climate Change: No significant impact identified.
Reduction / Income FTE
Page 62 of 274

Page 63

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Developing a resilient, stronger and greener local economy 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
2 Reduce Grant Funding to Pitlochry Festival Theatre 0 0 24
Economy,
Development
&
Planning
32% reduction over 3 years. The total annual revenue grant to Pitlochry
Festival Theatre (PFT) is currently £220,000.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact if reduction is profiled equally across 3
yrs.
Workforce: No significant impact identified directly for PKC. May impact on
PFT workforce.
Customer:  Pre-Covid PFT attracted 100,000+ visitors per year - may impact
on programme / activities.
Equalities/Diversity: There may be some impact on outreach/community
engagement programmes.
Outcome and Performance:  PFT attendances/impact on wider economy may
reduce.
Climate Change: No significant impact identified.
Page 63 of 274

Page 64

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Developing a resilient, stronger and greener local economy 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
3 Business & Place Development Team: Economic Development Events 220 0 0 Y
Economy,
Development
&
Planning
Full removal of economic development events function and budget. Financial
support for events contributes to the vitality of Perth city centre in particular by
providing a reason to extend visitor stays and expenditure. Any Council run
event for the purposes of economic development will not be held.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: While the largely free events programme is targeted at
visitors/residents outside Perth and Kinross, significant numbers of local people
also attend and therefore will lose access to free events.
Workforce: Yes
Customer: Impact on visitor expenditure on hospitality, food & beverages in
particular.
Equalities/Diversity: Reduced access to free events by those on lower
incomes.
Outcome and Performance: If no other funding sources replace Council
expenditure there will be an economic impact.
Climate Change: No significant impact identified.
Page 64 of 274

Page 65

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Developing a resilient, stronger and greener local economy 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
4 Business & Place Development Team: City & Town Centre Management 95 0 0
Economy,
Development
&
Planning
Deletion of the full budget for city and town centre management initiatives
including all business-facing marketing, and performance monitoring. This
would result in no support provided to local businesses or the direct marketing
and promotion of town centres and Perth City Centre e.g. Shop Local etc
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified.
Workforce: No significant impact identified.
Customer: Some impact identified although loss of dedicated resource will
mean increased response times  and no financial support available for street
events/animation/public realm dressing etc.
Equalities/Diversity: No significant impact identified.
Outcome and Performance: Reported issues in the city and town centres will
take longer to respond to/resolve.  Town centres and Perth city centre will not
have Council funded street events.
Climate Change: No significant impact identified.
Page 65 of 274

Page 66

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Developing a resilient, stronger and greener local economy 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
5 Business & Place Development: Perth & Kinross Heritage Trust 0 70 0
Economy,
Development
&
Planning
Revision of Service Level Agreement with Perth & Kinross Heritage Trust to
provide archaeological advice only to support planning application
determinations.  Alternatively, the services will be procured by the Development
Management Team from another local authority.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified.
Workforce: No significant impact identified.
Customer: Service would be procured as and when required
Equalities/Diversity: No significant impact identified.
Outcome and Performance: Potentially some delay in securing consultancy
support in respect of planning applications. Wider impact on the day to day
management of PKHT.
Climate Change: No significant impact identified.
Page 66 of 274

Page 67

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Developing a resilient, stronger and greener local economy 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
6 Building Standards & Planning - Income 240 0 0
Economy,
Development
&
Planning
An additional £200,000 has been applied for planning and building warrant
income.
A number of additional discretionary fees introduced, and others increased,
creating an income of £40,000. 
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact as increased charges proportionately
impact on domestic scale projects.
Workforce: No significant impact identified.
Customer: No significant impact
Equalities/Diversity: No significant impact
Outcome and Performance: Positive impact by reducing time wasted post-
application submission for example.
Climate Change: No significant impact identified.
Page 67 of 274

Page 68

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Developing a resilient, stronger and greener local economy 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
7 Commercial Rents - Income 25 0 0
Economy,
Development
&
Planning
St Johns Centre - Forecast marginal increase in rental income following the
opening of Perth Museum and some increased retail floorspace demand.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact
Workforce: No significant impact identified.
Customer: No significant impact
Equalities/Diversity: No significant impact
Outcome and Performance: No significant impact
Climate Change: No significant impact identified.
Page 68 of 274

Page 69

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Developing a resilient, stronger and greener local economy 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
8 Business & Place - Business Tourism 50 0 0
Economy,
Development
&
Planning
Cessation of activity to promote Perth and Kinross as a destination and
subsidise venues for business conferences and events
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact
Workforce: No direct impact identified
Customer: Perth and Kinross venues will not receive any financial support to
win conference and events business
Equalities/Diversity: No significant impact
Outcome and Performance: No activity to promote and secure business
tourism
Climate Change: No significant impact identified.
Page 69 of 274

Page 70

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Developing a resilient, stronger and greener local economy 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
9 Electric Vehicle Chargers  - Income 135 130 0
Economy,
Development
&
Planning
Scope to increase electric vehicle tariffs to reflect full cost recovery following
electricity cost increases.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact as electric vehicles are currently not
required and their purchase is a choice
Workforce: No impact
Customer: Marginal impact as still a cost effective fuel option
Equalities/Diversity: No significant impact
Outcome and Performance: Some impact as greater expectation of EV
chargers being operational.
Climate Change: No significant impact given pathway to ban combustion
engines.
TOTAL 791 200 24 1.0 0.0 0.0
Page 70 of 274

Page 71

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Enabling our children and young people to achieve 24/25 25/26 26/27 24/25 25/26 26/27
their full potential £'000 £'000 £'000 FTE FTE FTE
1 Increase in Charges for Childcare 39 41 10
Education &
Learning
Proposed increases in Out of School Kids Clubs charges; 24/25 5% from 1st
July 2024 and 5% from 1st July 2025
In addition, expansion of paid Early Learning and Childcare hours to allow
parent paid access to hours before and after free entitlement where capacity
exists. £15k in 24/25 and £10k in 25/26
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: May affect lower income families.
Workforce: None.
Customer: May affect uptake.
Equalities/Diversity: May impact on low income families.
Outcome and Performance: Lower uptake may lead to income budgets not
being achieved overall.
Climate Change: No impact.
Reduction / Income FTE
Page 71 of 274

Page 72

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Enabling our children and young people to achieve 24/25 25/26 26/27 24/25 25/26 26/27
their full potential £'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
2 Increase in Charges 650 40 19
Property Proposed increases in the following - School Meals & School Lets. School meal
charges have remained static since 2018. Uplift in year 1 reflects the
backdating of inflation. (24/25 36%; 25/26 3% & 25/26 3%). School lets (24/25
3%; 25/26 3% & 25/26 3%)
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: May affect lower income families.
Workforce: None.
Customer: May affect uptake.
Equalities/Diversity: Will impact on low income families.
Outcome and Performance: Lower uptake may lead to income budgets not
being achieved overall.
Climate Change: No impact.
Page 72 of 274

Page 73

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Enabling our children and young people to achieve 24/25 25/26 26/27 24/25 25/26 26/27
their full potential £'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
3 Reintroduce charges for Central Groups and full cost recovery for Music
Camps
48 0 0
Education &
Learning
Reintroduce charges for Central Groups and charge for full cost recovery of
Music Camps. 
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: May affect low income families.
Workforce: N/A.
Customer:  Increased charges for music camps and charges for accessing
central groups.
Equalities/Diversity: Systems could be put in place to ensure there is equal
access for those in receipt of certain benefits.
Outcome and Performance: No impact.
Climate Change: No impact.
Page 73 of 274

Page 74

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Enabling our children and young people to achieve 24/25 25/26 26/27 24/25 25/26 26/27
their full potential £'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
4 School Based Music Instruction 13 116 70 3.5
Education &
Learning
Review of allocation of music instructors, increasing group sizes and using
online delivery for some instruction.                 
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: Careful management of resources will be required to ensure
the principle of free tuition.
Workforce: 3.5 from 17fte
Customer: Change in delivery model.
Equalities/Diversity: No impact.
Outcome and Performance: Reduction in range and possibly extent of music
instruction opportunities.  Potential reputational risk to the Council.
Climate Change: Reduction in travel by instructors.
Page 74 of 274

Page 75

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Enabling our children and young people to achieve 24/25 25/26 26/27 24/25 25/26 26/27
their full potential £'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
5 Reduction in Education Psychology Capacity 0 86 0 1.0
Education &
Learning
A reduction in Educational Psychology capacity in addition to previous
reduction of 10%.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: May disproportionately affect those with greatest need.
Workforce: 1 from 9fte.
Customer:  Reduced support for vulnerable children and families with ASN.
Withdrawal of support for other activities supporting education and inclusion
provision.
Equalities/Diversity: Impact on vulnerable children and families.
Outcome and Performance: Psychologist team will require reorganising and
rationalising the service it provides. The service provided would need to be
limited in scope i.e. only able to deliver basic statutory functions.
Climate Change: No impact.
Page 75 of 274

Page 76

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Enabling our children and young people to achieve 24/25 25/26 26/27 24/25 25/26 26/27
their full potential £'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
6 Full removal of the School Crossing Patroller (SCP) Service 61 28 0
Property This proposal will remove all remaining School Crossing Patrollers.  There is no
funding for additional infrastructure improvements or any alternative crossing
provision installations. It is the parents’ responsibility to get their child(ren) to
and from school safely and Council staff will continue to work with parents in
respect of safe school travel planning. Where there is no assessed safe
walking route to school for pupils, accompanied by a responsible adult, these
pupils will continue to be transported by the Council.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No impact.
Workforce: Impact on Tayside Contracts workforce.
Customer: Parents have the responsibility to ensure the safe arrival and
collection of their children to school.
Equalities/Diversity: Will impact on Tayside Contracts lowest paid staff.
Outcome and Performance: Reputational risk to the Council.
Climate Change: No significant impact.
Page 76 of 274

Page 77

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Enabling our children and young people to achieve 24/25 25/26 26/27 24/25 25/26 26/27
their full potential £'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
7 Removal of Primary Swimming Lessons 40 20 0
Education &
Learning
Removal of primary swimming lessons from August 2024.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: Families on low incomes may not be able to afford to take their
child(ren) swimming.
Workforce: No impact on PKC staff, may impact on Live Active Leisure staff.
Customer: Children in rural areas will benefit from less time out of the
classroom as transport times can be significant.
Equalities/Diversity: Children from low income families may not access
swimming out with school.
Outcome and Performance: Reputational risk to the Council.
Climate Change: Reduced travel.
Page 77 of 274

Page 78

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Enabling our children and young people to achieve 24/25 25/26 26/27 24/25 25/26 26/27
their full potential £'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
8 Reduction in Parent Council funding. 20 0 0
Education &
Learning
Reduction in annual grants to support the operation of Parent Councils by 50%.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No impact.
Workforce: No impact.
Customer: Parent Councils will have less resources to administer their Council
meetings.
Equalities/Diversity: No impact.
Outcome and Performance: No impact.
Climate Change: No impact.
Page 78 of 274

Page 79

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Enabling our children and young people to achieve 24/25 25/26 26/27 24/25 25/26 26/27
their full potential £'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
9 Reduction in Tayside Contracts Contract fee 406 0 0
Property A review and reduction in Tayside Contracts Facilities Management (school
janitorial and cleaning) and catering costs with changes to the specifications.
Reduction in cleaning days in schools from 195 to 190 days per year in line
with pupil attendance (£217k). 
Reduction in Non School Cleaning by 20% (£189K)                                                                                
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No impact.
Workforce: Impact on Tayside Contracts workforce.
Customer:  Reduced opening times and reduced cleaning specification.
Equalities/Diversity: Impact on Tayside Contracts lowest paid employees.
Outcome and Performance: Reputational risk to the Council. Reduced
community access and facility management support.
Climate Change: No impact.
Page 79 of 274

Page 80

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Enabling our children and young people to achieve 24/25 25/26 26/27 24/25 25/26 26/27
their full potential £'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
10 Rationalisation of Minibus Provision 0 39 0
Education &
Learning
Rationalisation of access to Minibus to offset pressure due to increased costs. 
Introducing charging will also be considered.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No impact.
Workforce: No impact.
Customer: Possible reduced access or additional costs to users Including
schools and community groups
Equalities/Diversity: No impact.
Outcome and Performance: No impact.
Climate Change: No impact.
Page 80 of 274

Page 81

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Enabling our children and young people to achieve 24/25 25/26 26/27 24/25 25/26 26/27
their full potential £'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
11 Early Learning & Childcare Sustainable Rate to Partner Providers
- Scottish Government Funding
140 0 0
Education &
Learning
A revenue expenditure pressure to increase the sustainable rate to Partner
Providers by a further 2.5% in 2024/25 due to increase in Inflation. 2.5% was
agreed in March 2023.
This saving matches the pressure.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: This saving/pressure will impact on the Local authority ability to
offer flexibility to parents as part of Funding follows the Child that enables
parents to have choice of access to 1140 free funded hours across LA ELC,
Private, third sector, not for profit and childminders..
Workforce: No impact
Customer: Possible impact on choice for parents.
Equalities/Diversity: N/a
Outcome and Performance: N/a
Climate Change: No impact
Page 81 of 274

Page 82

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Enabling our children and young people to achieve 24/25 25/26 26/27 24/25 25/26 26/27
their full potential £'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
12 Reduction in Teacher Capacity 190 0 0 3.0
Education &
Learning
Using currently unfilled posts which will not affect Pupil Teacher Ratio or overall
number of teachers in settings but will impact on service ability to meet
slippage target.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No impact.
Workforce: 3fte reduction.
Customer:  No impact.
Equalities/Diversity: No impact.
Outcome and Performance: Impact on ability to respond to unplanned
staffing absences and provide crisis intervention.
Climate Change: No impact.
Page 82 of 274

Page 83

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Enabling our children and young people to achieve 24/25 25/26 26/27 24/25 25/26 26/27
their full potential £'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
13 33 Week Period in Secondary Schools 0 0 437 7.5
Education &
Learning
Proposed common 33 period week in all Secondary Schools in PKC. This
will only be achievable if class contact time remains at 22.5 hrs per week.
Delivery dependant on no changes to reduced class contact time for Teachers.
Impact Analysis and Risk Assessment                                                          
There are potential savings to be achieved in terms of staffing of a 50 minute
period model. In a 32 or 33 period week where periods are 50 minutes long,
class teachers would still be allocated a minimum of six periods of non-contact
time, this would amount to exactly 300 minutes, which results in an average
saving in terms of staff is  20 minutes per FTE compared to a 55 minute period
model. Currently period length in PKC is between 40 and 55 minutes.
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: Schools would have either two or three days which were
shorter than others                                                                                                         
Page 83 of 274

Page 84

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Enabling our children and young people to achieve 24/25 25/26 26/27 24/25 25/26 26/27
their full potential £'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
Workforce: 7.5 posts from 621.8
Customer: School weeks would have two or three days that were slightly
longer than the others. This model may have some impact on family
arrangements. Transport contracts would require to be altered to fit with model.
Equalities/Diversity: No impact.
Outcome and Performance: There is no detriment to learning experiences
but depending on model adopted schools will have two or three days that are
slightly longer than the rest of the week. Taking  the efficiencies above across
618FTE means that 12,360 more minutes or 206 hours are released to the
system equivalent to a saving of 7.5FTE. However depending on setting these
savings could be reduced by any additional transport costs.
Climate Change: No impact.
Page 84 of 274

Page 85

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Enabling our children and young people to achieve 24/25 25/26 26/27 24/25 25/26 26/27
their full potential £'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
14 Closure of Loss Making Breakfast Clubs 0 61 37 Y
Education &
Learning
Free Breakfast Clubs were introduced in targeted areas to provide food at the
start of the day for those pupils who would otherwise not benefit from breakfast
before school. Following the introduction of charging £2.00 per breakfast
uptake has been limited. All children in P1-5 are now entitled to a free school
meal. Saving proposal is to close Breakfast clubs with attendance less than
60% of staffed capacity from Aug 2025.    
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: Disadvantages those young people who make use of this
option.
Workforce: Yes
Customer: All children P1-5 are entitled to a free school meal.
Equalities/Diversity: This would mainly impact on low-paid females in terms of
the posts that would be lost.
Outcome and Performance: Parents who use the service as childcare would
require to find alternative provision.
Climate Change: No impact.
Page 85 of 274

Page 86

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Enabling our children and young people to achieve 24/25 25/26 26/27 24/25 25/26 26/27
their full potential £'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
15 Reductions to Devolved School Management Budgets (DSM) 52 0 0
Education &
Learning
Full removal of School Supply contingency budget for small schools.                                                                                                                                                                                                                                                                                                                                                                                                           
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No impact.
Workforce: No impact.
Customer: Budget is available to pay for staff. If insufficient supply budget is
available, classes may be disrupted including having to be sent home on
occasion.
Equalities/Diversity: No impact.
Outcome and Performance: There may be an impact on educational
progress.
Climate Change: No impact.
Page 86 of 274

Page 87

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Enabling our children and young people to achieve 24/25 25/26 26/27 24/25 25/26 26/27
their full potential £'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
16 Rationalisation of Education staff across the service 200 0 4,359 6.0
Education &
Learning
Redesign and reduce staffing. Major impact on outcomes for pupils particularly
those with additional support needs. May also impact on ability to deliver Early
Learning and Childcare Provision as part of extended eligibility criteria for  2
Year olds. Detailed planning and modelling will require to be undertaken to
identify where the reductions in school and centrally based staff will be made.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage:  May impact on ability to close the poverty related attainment
gap.
Workforce: 6 fte
Customer: Significant impact on young people with a range of ASN. Class
sizes will increase across all sectors.
Equalities/Diversity:  Depending on model used there maybe a
disproportionate impact on lower paid support staff.
Outcome and Performance: Reduced capacity to undertake statutory
improvement and quality assurance functions.
Climate Change: Less staff travelling to schools
Page 87 of 274

Page 88

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Enabling our children and young people to achieve 24/25 25/26 26/27 24/25 25/26 26/27
their full potential £'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
17 Young People with emotional and behavioural difficulties in Residential
Care
607 176 81
Children 
Families &
Justice
Budget currently allows for 11 placements of young people with emotional and
behavioural difficulties in Residential Care. Current number of placement is 15
(funded from temporary additional funding) with planned reduction to 11. There
is a pressure is to allow for provision of a further 3 placements. Saving is to
remove the provisions for additional placements over and above budgeted
number of 11. Risk is that any additional placements would cause service to go
into overspend position.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: As below
Workforce: No imact
Customer: : Need risk and requirement to meet statutory duties will continue to
inform decisions about most appropriate placements.
Equalities/Diversity: no impact
Outcome and Performance: Complexity of need and presenting risks
continue to mean the budget is overspent. Instruction from SCRA  can add to
the number of residential placements required. To mitigate the above
resources are being developed in early intervention but the outcomes of these
changes may not be seen for some time.
Climate Change: no impact
Page 88 of 274

Page 89

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Enabling our children and young people to achieve 24/25 25/26 26/27 24/25 25/26 26/27
their full potential £'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
18 Foster Carer and Kinship Carer Fee Payment 0 0 115
Children 
Families &
Justice
PKC pay rates must increase inline with SG Guidance and living wage causing
pressure - This is saving is offsetting a pressure by assumption uplift will be
fully funded by Scottish Government.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: as below.
Workforce: No impact.
Customer: Currently we have a national foster carer recruitment crisis. To
enable us to be competitive we need to maintain and provide inflationary
increases to the National recommended allowance (NRA)
Equalities/Diversity: 
Outcome and Performance: An inability to provide foster placements will
inevitably result in greater numbers requiring residential placements which are
less likely to meet the individual needs of the child/young person and are a
greater cost.
Climate Change: no impact
Page 89 of 274

Page 90

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Enabling our children and young people to achieve 24/25 25/26 26/27 24/25 25/26 26/27
their full potential £'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
19 Self Directed Support 105 0 0
Children 
Families &
Justice
PKC pay rates must increase inline with SG Guidance and living wage causing
pressure - offset by assumption uplift will be fully funded by Scottish
Government. Funding not yet confirmed by SG.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: SDS provides many families with the support to personalise
they way they meet their own needs.  This primarily targets the most vulnerable
children in our society.                                                                                 
Workforce: No impact
Customer: As above
Equalities/Diversity:  No Impact
Outcome and Performance: Without the respite that this money purchases
we will expect to see an increase in children with complex ASN needs
becoming accommodated in expensive residential placements because
parents are unable to manage at home.
Climate Change: No Impact
Page 90 of 274

Page 91

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Enabling our children and young people to achieve 24/25 25/26 26/27 24/25 25/26 26/27
their full potential £'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
20 Standardisation of School Meal Offer 400 0 0
Property Reduction in options available for school meals to remove high-cost items and
reduce overall food costs.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: as below.
Workforce: no impact
Customer: Reduced offer may affect uptake.
Equalities/Diversity:
Outcome and Performance: Uptake of School meals will decrease due to less
options.  This will predominately impact on secondary school uptake which is
already an area of concern given the nutritional benefit of a school meal.
Climate Change: no impact
TOTAL 2,971 607 5,128 9.0 11.4 7.5
Page 91 of 274

Page 92

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Protecting and caring for our most vulnerable people 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
1 Housing and Homeless Support - Contract and Commissioning 0 66 0
Housing
&
Communities
Reduction in the level of funding by 8% from the total budget for the third
sector hostel providers in 2024/25. 
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: There may be reduction in the number and availability of
temporary accommodation for homeless people. 
Workforce: No impact on PKC but may lead to workforce reductions in the
providers.
Customer: May lead to a reduction in the number of hostel units (bed spaces)
available to homeless people and the possibility of having to accommodate
people in unsuitable accommodation such as B&B.
Equalities/Diversity:  Hostel accommodation is provided to those with
complex needs or who have significant support needs.  The reduction in units
may impact on the most vulnerable.
Outcome and Performance: May impact on the council's ability to meet their
statutory duty to provide temporary accommodation.  May also lead to an
increased use of unsuitable accommodation such as B&B which in turn may
lead to a financial pressure for the council.
Climate Change: No significant impact identified.                                                                                                                            
Reduction / Income FTE
Page 92 of 274

Page 93

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Protecting and caring for our most vulnerable people 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
2 Housing and Homeless Support - Service Level Agreements with
Providers
0 0 117
Housing
&
Communities
A reduction of 10% in funding for Service Level Agreements in areas such as
money advice, housing support, housing support, and digital inclusion
activities.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: May result in a reduction in service provided through the
agreements. 
Workforce: No reduction for PKC but may impact on the providers.
Customer: May impact on older people (reduction in support within sheltered
housing), advice for people with money worries and difficulties, people fleeing
domestic abuse and those who are digitally excluded.
Equalities/Diversity: May impact on the most vulnerable.
Outcome and Performance: May result in some situations escalating into a
crisis and may lead to pressure on other services. 
Climate Change: No significant impact identified.
Page 93 of 274

Page 94

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Protecting and caring for our most vulnerable people 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
3 Housing and Homeless Support - Private Sector Housing Team -
Workforce Reductions
0 88 0 2.0
Housing
&
Communities
Workforce reduction resulting in reduced capacity to support various initiatives
to securing access in private rented accommodation which has been key to the
success of Home First including the Rent Bond Guarantee Scheme, PKC Lets -
Social Letting Agency and Empty Homes Initiative.
Page 94 of 274

Page 95

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Protecting and caring for our most vulnerable people 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: The services and initiatives delivered by the team will be 
reduced which may impact on access to private rented accommodation for
people at risk of homelessness, reduce the level of income the team generate
through PKC lets and the number of empty homes they can bring back into
use.
Workforce: Staffing reduction of 2 FTE of 5.6 FTE.
Customer: The reduction in services may impact on people in housing need
and vulnerable people including those at risk of homelessness.
Equalities/Diversity: May impact on people such as those at risk of
homelessness or those in housing need due to a change in their medical or
support needs, including overcrowding.
Outcome and Performance: Greater pressure on social housing, people
staying longer in temporary accommodation and a reduction in income through
PKC Lets. There may be a reduction in private sector landlord support for
some tenants and a pressure on homelessness services. There may be a
reduction in the number of empty properties brought back into use. 
Climate Change: The advice and information about energy efficiency
standards and grant funding etc. may be reduced which may have an impact
on some properties being brought up to the required standards. 
Page 95 of 274

Page 96

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Protecting and caring for our most vulnerable people 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
4 Housing and Homeless Support -  Housing Service Team - Workforce
Reductions
0 88 0 2.0
Housing
&
Communities
Workforce reduction in registered Housing Support Officers resulting in
reduced capacity to provide a range of support and assistance to people at risk
of homelessness, who are homeless or who have secured settled
accommodation to keep their accommodation. This impacts on all tenures and
is key for early intervention and prevention and also for some of the success of
Home First.
Page 96 of 274

Page 97

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Protecting and caring for our most vulnerable people 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: The level of support and interventions may be reduced.  This
reduction may lead to an increase in homelessness, an increase in failed
tenancies and a pressure on temporary accommodation. 
Workforce: Staffing reduction of 2 FTE of 9.7 FTE.
Customer: Those at risk of homelessness and vulnerable people may be
mostly affected by the service reduction.  This includes people fleeing domestic
abuse, substance issues, mental health issues, offending behaviour and
people just released from prison or discharged from hospital.
Equalities/Diversity: Vulnerable people may be impacted by the reduction as
service capacity will be reduced.  This also includes support for physical and
mental wellbeing. 
Outcome and Performance: Our ability to intervene early and prevent
homelessness may be reduced  - leading to a potential increase in
homelessness and failed tenancies.  The reduction may also impact on our
ability to meet our statutory duty to ensure a support assessment was carried
out and the appropriate support provided to homeless people.  It may also lead
to an increase in the time people spend in temporary accommodation which
may result in pressure for more units of temporary accommodation or greater
use of B&B accommodation  and may result in cost pressure to the council.
Climate Change: No significant impact identified.
Page 97 of 274

Page 98

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Protecting and caring for our most vulnerable people 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
5 Housing Service - Care and Repair Service 0 300 100
Housing
&
Communities
The Care & Repair Service provides information and advice, along with grant
funding, for older people and people with a disability who are homeowners or
private tenants, to enable them to improve, repair or adapt their homes and
stay comfortably in their community.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: The reduction will reduce the number of major adaptations and
small repairs carried out which may impact on supporting older people or
people with a disability to live independent and healthy lives within their own
homes.
Workforce: No workforce implications as the work is outsourced to private
contractors.
Customer: May lead to more older people or people with a disability being
delayed from being discharged from hospital. There may also be an adverse
impact on people’s health if homes are not warm and waterproof.
Equalities/Diversity: May impact on the most vulnerable - particularly older
people and people with a or living with a person that has a disability and
requires their home to be adapted.
Outcome and Performance: This may have an impact on PKC and HSCP
achieving their strategic objectives.  This may result in increased admissions to
hospital and care homes and an increase in the number of people delayed in
hospital. 
Climate Change: No significant impact identified.
Page 98 of 274

Page 99

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Protecting and caring for our most vulnerable people 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
6 Housing and Homeless Support - Reduce Floating Housing Support
Contract
0 0 125
Housing
&
Communities
Reduce Floating Housing Support Contract budget by 10%. This contract is
made up of three voluntary sector providers (CATH, Turning Point Scotland
and Simon Community) that collective provide various housing support and
assistance to people at risk of homelessness, people who are homeless or
those struggling to sustain their current accommodation.
Page 99 of 274

Page 100

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Protecting and caring for our most vulnerable people 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: May reduce the number of hours available through the contract
as part of the re-tendering process. 
Workforce: None for PKC but may impact on providers.
Customer: Those at risk of homelessness or currently homeless may be
impacted by the reduction in the hours of housing support available.  This
includes people fleeing domestic abuse, people with substance misuse issues,
those with mental health issues, people released and / or discharged from
prison and hospital.
Equalities/Diversity:  Vulnerable people may be impacted by the reduction in
the number of hours.
Outcome and Performance: Our ability to intervene early and prevent
homelessness and crisis situations may be reduced.  This may lead to an
increase in failed tenancies and a rise in homeless presentations. We also
have a statutory duty to assess housing support needs of people presenting as
homeless.  If we identify from this assessment the need to provide support, we
may struggle to meet this requirement due to the reduction in service provision.
Climate Change: No significant impact.
Page 100 of 274

Page 101

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Protecting and caring for our most vulnerable people 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
7 Review of SLA Payments 0 130 0
Strategic
Planning,
People &
Performance
A review of all Service Level Agreements with third party organisations will be
undertaken to ensure that the Council’s strategic aims and objectives are being
achieved and future requirements are built into any ongoing agreement.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified
Workforce: No significant impact identified.
Customer: No significant impact identified.
Equalities/Diversity: The removal of these budgets will impact on both
minority groups and people who are suffering with mental health issues.
Outcome and Performance: No significant impact identified.
Climate Change: No significant impact identified.
Page 101 of 274

Page 102

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Protecting and caring for our most vulnerable people 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
8 Reduction to Criminal Justice Support (CJS) 0 42 43 1.9
Children 
Families &
Justice
A reduction in front line social work staff in CJS.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage:  The Scottish Government’s Vision for Justice is to shift the
balance from prison to community by substantially expanding justice options to
avoid the use of remand.  Removal of front-line staff will impact on the ability to
deliver this Vision and alternative community disposals, reduce re-offending,
meet unmet justice needs or improve the quality of life/outcomes for people
who commit offences.  The impact will also be on their families which
contradicts the principles in the Promise.  As people in the justice system are
often from the lowest social economic group, this will increase protection
concerns and community safety issues for the most vulnerable.
Workforce 2 FTE from 22 FTE (front line social work).
Customer: This will lead to poor outcomes for those in the Criminal Justice
system and will impact negatively on the community and increase safety
concerns.
Equalities/Diversity: No significant impact identified.
Outcome and Performance: We may not be able to meet our statutory
reporting requirements.  The time frame to respond to the needs of those in the
criminal justice system will be compromised.
Climate Change: No impact.
Page 102 of 274

Page 103

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Protecting and caring for our most vulnerable people 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
9 Children, Family and Justice Service Redesign 0 0 464
Children 
Families &
Justice
In response to the increase in prevention & early intervention arising from
Whole Family Wellbeing investment and working alongside parenting and
family support services across partners and a commitment to delivering the
Promise, this proposal is to
•	complete a service redesign across Children, Families & Justice to deliver
statutory services in new ways; and
•	complete a review of commissioned child and family support/care services.
The intention is to deliver earlier and more effective family support to reduce
reliance on statutory resource over time and ensure sufficient capacity to
respond to critical need and ensure compliance with statutory demands for
supervision, the provision of mandatory contact sessions for children and their
parents (from court or Children’s Hearings).
Page 103 of 274

Page 104

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Protecting and caring for our most vulnerable people 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: as below.
Customer:  The intention is to deliver earlier and more effective family support
and at the same time protect our most vulnerable and at-risk children and
families, however, the premature reduction in statutory child protective services
presents a risk that the quality and effectiveness of child protection would fall
and the risks to children increase. Families would experience higher levels of
acute crisis.
Equalities/Diversity: Reductions in service will have a direct impact on the
most vulnerable members of society including women, children, those living in
poverty, affected by disability, mental ill-health and substance misuse.
Outcome and Performance: Failure to deliver will result in a reduction in
performance including, timescales for Children’s Hearing Reports and Court
reports; the frequency of contact with families and children; resulting in poorer
outcomes.  Our compliance with statutory duties of supervision and mandatory
contact sessions for children and their parents (from court or Children’s
Hearings) would be impeded.
Climate Change: no impact
TOTAL 0 714 849 0.0 5.9 0.0
Page 104 of 274

Page 105

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Supporting and promoting physical and mental wellbeing 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
1 Arms Length External Organisations - Reduce Contract Fee 0 0 331
Economy,
Development
&
Planning
The Council agreed a Transformation project on the 6th December 2023.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: Universal free access to culture and sport would reduce;
economic impact of culture and leisure would reduce which has wider impact
on local jobs, supply chains etc. 
Workforce: No significant impact identified directly for PKC. Impact on  ALEOs
workforce.
Customer:  Pre-Covid the ALEOs attracted over 3M annual usages and return
rates are recovering.
Equalities/Diversity: There may be an adverse impact on equalities and
diversity groups including lower income households and health and wellbeing
outcomes will reduce.
Outcome and Performance: Budget cuts will have reputational impact on all
major funders. There will be a detrimental impact on the availability of venues
and services all ALEOs across Perth and Kinross.
Climate Change: The impact will be informed by the ALEO leisure asset
review.
TOTAL 0 0 331 0.0 0.0 0.0
Reduction / Income FTE
Page 105 of 274

Page 106

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
1 Adult Learning - SLA 0 92 0
Housing
&
Communities
Remove adult literacy services across Perth and Kinross.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: Adult learning providers are commissioned to provide training
leading to a qualification for vulnerable people which in turn helps them into
work, training or further education. Learners are generally already
disadvantaged and includes individuals with no or very limited use of English,
homeless people, people with substance addiction and people with poor mental
health. Removing this funding would severely impact our ESOL provision in
P&K which would affect our ability to support asylum seekers and refugees in
particular. Demand pressures in this area have grown and are set to increase.
Workforce:  No impact on PKC employees, however providers will be
impacted.
Customer:  The number of service users is now increasing steadily (back
towards pre Covid-19 numbers) with increased numbers of asylum seekers and
refugees driving need.
Equalities/Diversity: As outlined above.
Outcome and Performance: there are statutory and corporate performance
indicators for the CLD Plan which includes adult learning. Saving will impact on
key corporate priorities: poverty and sustainable economic growth.
Climate Change: No significant impact identified.
Reduction / Income FTE
Page 106 of 274

Page 107

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
2 Community Learning and Development -  Adult Literacy 28 152 0 Y Y
Housing
&
Communities
Full removal of Adult Literacy services (linked to £92,000 Adult Learning SLAs
saving above).
The Adult Learning team deliver literacies as part of the statutory Community
Learning & Development Plan.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage:  Adult learning activities include support for asylum seekers
and refugees and therefore removing this team would mean PKC is unable to
deliver ESOL or literacy/numeracy training, placing additional pressure on other
partners e.g. Perth College and 3rd sector partners.
Workforce: Yes
Customer:  Adults accessing free literacy and ESOL provision, including
asylum seekers and refugees
Equalities/Diversity: There would be impact on vulnerable and low income
individuals and families including, refugees and asylum seekers accessing
Adult Learning services.
Outcome and Performance: There are statutory and corporate KPIs for
Community Learning and Development.  Impacts on corporate objective of
tackling poverty
Climate Change:  No significant impact identified.
Page 107 of 274

Page 108

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
3 Community Learning and Development - Further Reductions 0 119 0 2.6
Housing
&
Communities
Review of Community & Learning Development team. CLD Workers co-
ordinate Community Learning and Development activities across localities in
Perth and Kinross, including community capacity building, adult learning,
supporting community groups with funding applications and governance,
supporting the delivery of Community Action Plans, Local Action Partnerships
and co-ordination and delivery of a range of PKC funding including Community
Investment Fund, Warm Welcome Fund, Green Living Fund.  Removing these
posts would mean that this level of service provision across all localities may
no longer be viable and the team could only focus on areas of highest need.
Page 108 of 274

Page 109

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: The CLD function works to address socio economic
inequalities in communities, supporting the community to develop their own
solutions and providing support and advice to access funding, including
significant PKC grants.  Removing these posts may mean this service may not
be provided in all localities, impacting PKC's ability to address socio economic
inequalities. 
Workforce:  Staffing reduction of 2.6 FTE of 12.3 FTE.
Customer: Impact on community groups, adult learners, Development Trusts,
Local Action Partnerships.
Equalities/Diversity:  As above
Outcome and Performance: there are statutory and corporate performance
indicators for the CLD Plan which includes community capacity building and
adult learning. Saving may impact on key corporate priorities: poverty, working
with communities and sustainable economic growth.
Climate Change: No significant impact identified.
Page 109 of 274

Page 110

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
4 Community Planning - Reduced Capacity 0 42 0 Y
Strategic
Planning,
People &
Performance
Reduced capacity in Community Planning
The Community Planning team supports the statutory Community Planning
function including coordination of the Local Outcomes Improvement
Plan(LOIP), Local Action Plans and Community Asset Transfers and Common
Good/Community Investment Fund administration.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: The Community Planning Team coordinates delivery of the
LOIP addressing socio-economic inequalities in line with Community
Empowerment Act. Alternative administration and reporting arrangements for
Period Dignity would also be required.
Workforce:  Yes
Customer:  This proposal will impact on CIF, Common Good, Local Action
Partnerships, and support to the CPP Board and its various sub-groups.
Equalities/Diversity: There would be impact on vulnerable and low income
individuals and families including people accessing Period Dignity
Outcome and Performance: A statutory requirement to produce and deliver a
LOIP and produce an annual APR for the LOIP.
Climate Change:  No significant impact identified.
Page 110 of 274

Page 111

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
5 Public Transport - Local Bus Services 775 0 0
Housing
&
Communities
Reduction in local bus service provision.
As a non-statutory service the level of saving could in theory be anything up to
the full budget although would have significant implications for mobility of the
public in relation to employment, access to healthcare, further education,
leisure/retail and social interaction etc.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: Access to transport is a key issue in tackling poverty, inequality
and inclusivity in terms of employment, education and healthcare.
Workforce: No significant impact identified.
Customer:  Significant impact on public transport travel opportunities, not just
in rural areas, but also in parts of Perth City. Sustainability of some local bus
services are already under extreme pressure, particularly in more rural
locations. Would have greatest impact on those in poverty, exacerbated by the
cost of living crisis.
Equalities/Diversity: Reduced local bus service timetables will have an impact
in terms of increased social exclusion, particularly in rural areas.
Outcome and Performance: Will result in contraction of the bus network,
including some peak services, thus impacting on routes serving work,
education and health related needs.  Only skeleton Sunday and evening
services are likely to remain on some corridors.
Climate Change: Potential negative impact on climate change and air quality
as fewer people will have access to public transport.
Page 111 of 274

Page 112

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
6 Park & Ride Departure Charges 40 0 0
Housing
&
Communities
Additional income arising from increased bus operator use of Broxden  park
and ride facility.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified.
Workforce: No impact.
Customer: No significant impact identified.
Equalities/Diversity: No significant impact identified.
Outcome and Performance: No significant impact identified.
Climate Change: No significant impact.
Page 112 of 274

Page 113

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
7 Community Greenspace - Nursery 41 0 0
Housing
&
Communities
Additional income generation from the sale of trees and plants and the removal
of large planting containers in Perth City on High Street, Mill Street and the
Concert Hall.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified.
Workforce: No significant impact identified.
Customer: No significant impact identified.  Loss of planters will reduce the
quality of the appearance of the city centre.
Equalities/Diversity: No significant impact identified.
Outcome and Performance:  Loss of planters will reduce the quality of the
appearance of the city centre.
Climate Change:  No significant impact identified.
Page 113 of 274

Page 114

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
8 Winter Maintenance - Out of Normal Hours Treatment 110 0 0
Environment
&
Infrastructure
Remove all out of normal hours treatment to footway network with the
exception of Perth City Centre as carried out by Operations under 7 day
working. Footways will only be treated during working hours Monday to Friday.
Total winter maintenance budget  includes standing charges.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified.
Workforce: No significant impact identified directly for PKC. Impact on Tayside
Contracts workforce.
Customer: Increase in complaints. Start routes Mon-Fri at 8am so all routes
currently gritted by 07:30 will not be gritted prior to school/work travel. Cat 2
routes, currently treated after the Cat 1 routes likely won't be treated at all by
the time Cat 1s are completed meaning less coverage.
Equalities/Diversity: No significant impact identified.
Outcome and Performance: Potential increase in accident / casualty rate
throughout winter period. Reduced resilience in times of severe weather.
Climate Change: No significant impact identified.
Page 114 of 274

Page 115

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
9 Winter Maintenance - Reduce Network Coverage by 20% 450 0 0
Environment
&
Infrastructure
The length of road network currently receiving Priority Winter Maintenance
treatment is 910km which would reduce to 728km. It would also effect on our
ability to treat lower category of roads due to reduced resources. Total winter
maintenance budget  includes standing charges.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified on individuals but community
wide will be impacted.
Workforce: No direct impact on PKC staff but will have Tayside Contracts
workforce implications.
Customer: Increased public complaint and likely increased accident/casualty
rate.
Equalities/Diversity: No significant impact identified.
Outcome and Performance: Many routes currently treated as a Cat 2 or Cat 3
will no longer receive any treatment. Reduced resilience in times of severe
weather.
Climate Change: No significant impact identified.
Page 115 of 274

Page 116

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
10 Winter Maintenance - Increase route gritting times to 3 hours across all
Category 1 routes.       
100 0 0
Environment
&
Infrastructure
Many authorities already have a 3 hour treatment timescale for Cat 1 routes.
As a result of later Cat 1 completion this will impact on Cat 2 route start times
as the vehicles finish Cat 1 and move onto Cat 2 . Fewer vehicles will also
mean our ability to treat Cat 2 routes is reduced so may result in infrequent
treatment. Saving will also impact on some school transport routes. Total
winter maintenance budget  includes standing charges.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified to individuals but community
wide will be impacted.
Workforce: No direct impact on PKC staff but will have Tayside Contracts
workforce implications.
Customer: Will take longer to treat routes, so many routes, currently gritted by
07:30 will not be gritted prior to school/work travel (8am). Some school
transport routes will be affected also.
Equalities/Diversity:  No significant impact identified.
Outcome and Performance: Increased public complaints and potential for
increased accident / casualty rate. This in conjunction with saving to reduce
network coverage by 20% will reduce our gritter/plough numbers and impact on
resilience in times of severe weather.
Climate Change: No significant impact identified.
Page 116 of 274

Page 117

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
11 Community Greenspace - Maintenance 51 52 117 1.0
Housing
&
Communities
Planned Maintenance - 32% reduction in planned maintenance activities for
general repair and maintenance in public parks and open spaces (benches,
fencing, bridges groundworks etc). £51,000 from a total budget £157,000.
Page 117 of 274

Page 118

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
Full removal of the play special projects budget of £52,000 which is used to
replace and fund repairs of larger items of equipment and surfacing which
would need to be met from grants or external funding when available.
Play equipment repairs, inspections and maintenance - 24% reduction leading
to longer repair times and periods of unavailability of play equipment. £80,000
from a total budget of £341,000
Remove 1 FTE post £37,000.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: Reduced access to play areas, safe public parks and open
spaces which promote healthy and active lives due to longer down times and
assets being unavailable for use.
Workforce: Staffing reduction of 1 FTE of 7.8 FTE.
Customer: Risk of more complaints. Play equipment and park infrastructure
items will need to be removed or left unrepaired for longer
Equalities/Diversity: No significant impact identified.
Outcome and Performance: Loss in environmental quality of public space.
Decline in the management of greenspace assets and a poorer quality of
environment. Impact on asset management due to reduced proactive
maintenance. Reduced number of play equipment items and potential closure
of some play areas.
Climate Change:  Child carers may have to travel further and by vehicle to
access facilities.  Repairs and resilience of infrastructure affected by climate
change impacts may be delayed or not carried out.
Page 118 of 274

Page 119

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
12 Community Greenspace - Infrastructure 85 0 0
Housing
&
Communities
Verge cutting - reduced frequency of verge cutting from once a year to once
every two years other than in areas such as key junctions based on risk. £65k
from a total budget of £135k.
Tree and woodland maintenance  - 10% reduction in tree and woodland
maintenance contract. £20k from a total budget of £199k.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified. 
Workforce: No significant impact identified.
Customer: Risk of more complaints. Resources will be targeted towards
dealing with more dangerous trees meaning less resource for other less urgent
issues which are causing negative impacts to residents.
Equalities/Diversity: No significant impact identified.
Outcome and Performance: Potential road safety issues for pedestrians and
cyclists where verges have not been cut.
Climate Change:  Positive impact on climate change due to enhanced bio-
diversity on road verges.
Page 119 of 274

Page 120

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
13 Street Cleansing - Reduction in Activity 168 168 0 6.0 6.0
Environment
&
Infrastructure
No street cleansing to be undertaken by hand across the Council area resulting
in a reduction of 12 barrow operative posts.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: Limited redeployment and/or retraining opportunities for
affected staffing group within and outwith the Council for some of the Council's
lowest paid members of staff.
Workforce: Staffing reduction of 12 FTE of 77.6FTE.
Customer: It is envisaged that this saving proposal would be considered in
tandem with community engagement in the locations affected with the objective
of securing understanding of the community and to enlist the support of
residents in performing litter collection.
Equalities / Diversity: Lower paid members of the workforce will be affected
by job loss.
Outcome and Performance: A detrimental effect on street cleanliness across
all localities and reduced capacity to assist other statutory operational sections
within Operations particularly during holiday periods or periods of sickness
absence, with significant impact on the visual amenity of the area and potential
for restricted opening times at recycling sites and temporary closure of public
toilets. Streets and open spaces of communities would cease to receive regular
litter picking resulting in an accumulation of litter, an air of untidiness, a likely
increase in complaints and the increased potential for a breach of the
Environmental Protection Act. In addition, the barrow operatives assist with
winter footway treatment.
Climate Change:  Impact on severe weather response.
Page 120 of 274

Page 121

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
14 Operations Training 0 0 48 1.0
Environment
&
Infrastructure
Reduction in training support to align with service reductions across
Operations.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified.
Workforce: Staffing reduction of 1 FTE of 5FTE.
Customer: No significant impact identified.
Equalities/Diversity: No significant impact identified.
Outcome and Performance: There would be less training capacity although
should the workforce reduce significantly there should be a corresponding
reduction in training needs.
Climate Change: No significant impact identified.
Page 121 of 274

Page 122

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
15 Operations - Management & Supervisory Capacity 0 0 131 3.0
Environment
&
Infrastructure
Reduction in management capacity within Operations linked to the Street
Sweeping and Grounds Maintenance savings through a restructure of the
management and supervisory arrangements within the Service.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified.
Workforce: There would be a reduction in the workforce/management capacity
of the Service in the form of reduced supervisor/manager/foreman cohort.
Staffing reduction of 3 FTE of 17.2 FTE
Customer: The Service would be less able to respond to customer and elected
member enquiries and complaints.  It would also potentially be slower to
respond to ongoing service issues or demands.
Equalities/Diversity: No significant impact identified.
Outcome and Performance: Less management capacity would lead to a
reduction in performance levels, responsiveness, and a reduced ability to
supervise staff. The service's Health and Safety arrangements would need to
be reviewed to ensure they remained adequate.
Climate Change: No significant impact identified.
Page 122 of 274

Page 123

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
16 Regulatory Services 10 144 83 3.0 2.0
Housing
&
Communities
Workforce reduction across Trading Standards, Food Safety and
Environmental Health functions. Opportunities for review and/or consolidation
with other enforcement and licencing activities across the Council would be
explored to mitigate the impact of these reductions with a view to creating
efficiencies in management and operating practices to ensure the Council
continued to meet its minimum statutory obligations.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: Regulatory Services focus on support to businesses and
residents, some of whom are the most vulnerable in society.  This can be via
scamming, unscrupulous food traders or online sellers or the safety of the air
we breathe to ensure that people live longer, heathier lives. This proposal
would reduce the Council's ability to support businesses and residents,
potentially including vulnerable individuals (predominantly the young and the
elderly) as the team would have less capacity to carry out any proactive
function..
Workforce:  Staffing reduction of 5 FTE of 20.5FTE.
Customer: : Notwithstanding the Council’s duty to discharge their statutory
functions in the fields of Food Safety, Environmental Health and Trading
Standards, customers would experience longer response times and/or be
informed that the Council no longer has capacity to carry out some functions.
The proposal would impact on the teams’ ability to respond to issues of a
specialist or complex nature including supporting gypsy travellers who
frequently visit the P&K area. Reduced capacity to deal with environmental
health enquiries such as statutory nuisance and noise complaints etc. and their
obligations to meet those statutory functions and avoid sanction by third
parties, e.g. Food Standards Scotland.
Page 123 of 274

Page 124

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
Equalities/Diversity: It is the function of Regulatory Services Teams to
support individuals who are socially disadvantaged or vulnerable.
Outcome and Performance: A further reduction in food safety inspections
and/or health and safety interventions on top of previous service reductions in
recent years would result in a largely reactive service across Food Safety,
Environmental Health and Trading Standards with limited planned and
proactive work across the teams. Resources would continue to be deployed to
high risk, high priority areas of work to ensure the Council continued to meet its
minimum statutory obligations. A Food Standards Scotland audit undertaken in
June 2022 highlighted that the team provided Reasonable Assurance and
controls were adequate but required improvement, however it also noted that
the current number of staff made it challenging to achieve and maintain the
requirements of the Food Law Code of Practice, with the Food Standards Audit
Branch formally noting that Regulatory Services already have a deficit of 5
EHOs to carry out the Council’s obligations regarding Food Enforcement. Any
further reductions could lead to an even greater backlog potentially resulting in
FSS intervention (as has occurred in Scottish Borders Council).
Climate Change: No significant impact identified.
Page 124 of 274

Page 125

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
17 Roads Maintenance Partnership - Reactive Maintenance 0 128 59 1.0
Environment
&
Infrastructure
1. Reduction in road defect repairs, e.g. damaged bollards, and potholes
£81,000.
2. Reduction in road markings refresh (from 3 to 4 years) but would still
prioritise safety critical lines £32,000.
3. Reduction in other routine work, e.g. replacing street name plates, road
signs, repairing damaged walls and kerbstones £27,000.
4. Remove 1 FTE post £47,000.
Page 125 of 274

Page 126

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified as all who use the network
would be similarly disadvantaged
Workforce:  Staffing reduction of 1 FTE of 11 FTE.
Customer: Complaints will increase.  Reactive response to complaints on the
network will be delayed and responsiveness to flood alerts/warnings will be
reduced. Ability to implement flooding response may be compromised due to
out of hours work being exceeded and no resilience to cover. Other activities
that the public expect to be addressed such as 3rd party utility or Scottish
Water flooding issues where we currently assist will not be facilitated.
Equalities/Diversity: No significant impact identified as all who use the
network would be similarly disadvantaged
Outcome and Performance: Road network will be less well maintained and
visually appear so. More gullies will remain blocked with more standing water
on the road.  Lack of maintenance will reduce the effective operational life of
the asset requiring it to be replaced/structurally repaired earlier. Road
Condition Index will decline.
Climate Change: The impact of climate change on the road network will be
further exacerbated by the reductions above.
Page 126 of 274

Page 127

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
18 Traffic and Road Safety 50 48 48 1.0 1.0
Environment
&
Infrastructure
Workforce reduction resulting in reduced capacity to deliver Traffic and Road
Safety related activities.
Traffic Orders - As the capacity of the team would reduce, expenditure in this
area would also see a corresponding reduction £10,000. (20% of £50,000 total
budget).
Traffic AIP - This would lead to a reduction of £40,000 in road safety measures
such as VAS, safety barriers and anti skid surfacing in identified areas of need.
(19% of £208,000 total budget).
Remove 2 FTE post £96,000.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified.
Workforce: Staffing reduction of 2 FTE of 9.2 FTE.
Customer: Ability to deal with initial complaints and enquiries will be reduced
resulting in increased workload dealing with formal complaints etc.
Equalities/Diversity: Some impact on individuals and the community including
more vulnerable road users.
Outcome and Performance: Increased complaints from public regarding
parking issues and road safety matters. Reduced capacity to secure and
deliver grant funded traffic and road safety related projects including active
travel schemes. Reduced ability to contribute to Scottish Govt national accident
reduction targets and delivery of national initiatives.
Climate Change: Reduced ability to contribute to Scottish Govt national
climate change targets (e.g. active travel).
Page 127 of 274

Page 128

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
19 Refuse Collection - Garden Waste Permit Charge 0 180 0
Environment
&
Infrastructure
Increase charge from £40 to £45 per bin in 2025/26.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified.
Workforce: No significant impact identified.
Customer: No significant impact identified.
Equalities/Diversity: No significant impact identified.
Outcome and Performance: There is a risk that there may be a drop-off in the
customer base as a result of this further increase.
Climate Change: No significant impact identified.
Page 128 of 274

Page 129

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
20 Non Statutory / Discretionary Charges 40 40 90
Housing
&
Communities
Increase non-statutory/discretionary charges across Communities by 4% per
annum.
Bereavement Services – 4% per annum
Regulatory Services – 4% per annum
Pitches & Park Events – 4% per annum
Road Network Commercial Charges – 4% per annum
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified but will impact more on those
with fewer resources.
Workforce: No significant impact identified.
Customer: No significant impact identified.
Equalities/Diversity: The increase in bereavement charges may result in an
increase in the number of public health funerals.
Outcome and Performance: There is currently no benchmarking information
available nationally for bereavement charges.
Climate Change: No significant impact identified.
Page 129 of 274

Page 130

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Working in partnership with communities 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
21 Parking Services 0 5 95
Housing
&
Communities
Increase parking charges by 4% to offset the impact of inflation on operating
costs and investment in car parking infrastructure. Proposed increase excludes
Penalty Charge Notices, Vehicle Uplift Charges and Blue Badges which are set
by statute. Actual % change will vary due to minimum 10p coinage requirement
in ticket machines and actual income generated will be subject to public
response to increases.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: May present an additional cost burden to customers with
limited access to other means of suitable transport for employment, healthcare
and essential shopping etc combined with the current cost of living crisis.
Workforce: No significant impact identified.
Customer: Potential resistance from customers and business community.
Equalities/Diversity: No significant impact identified.
Outcome and Performance: Potential that customer base will drop off
resulting in no real increase in income generated.
Climate Change: Increased parking charges might encourage car owners to
use more environmentally friendly modes of transport including the option of
active travel with associated health benefits and positive impact on air quality.
TOTAL 1,948 1,170 671 7.0 18.0 8.0
Page 130 of 274

Page 131

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Organised to Deliver / Transformation 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
1 Customer Service Centre Efficiencies 0 72 82 2.3 2.5
Customer &
Digital
This reduction is based on reverting to appointments only system and
undertaking a channel shift programme to move more customer contact online.
This area is subject to a consolidation workstream/review.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified
Workforce: 4.8 FTE out of 22 FTE.
Customer: Without closing channels/channel shift to Online the impact will be
longer waiting times for customer that will be significant during busy periods.
Equalities/Diversity: Potential impact on people who may be digitally excluded
but there are mitigation measures in place which will be reviewed through
monitoring of usage.
Outcome and Performance: No significant impact identified.
Climate Change: No significant impact identified.
Reduction / Income FTE
Page 131 of 274

Page 132

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Organised to Deliver / Transformation 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
2 Reduced Capacity across the whole of Strategy, People and Performance 174 0 368 1.8 0.0 8.5
Strategy,
People &
Resources
This reduction is based on reducing staffing budgets across the following
areas:
Finance & Business Support a reduction of 4fte in addition to the 18fte
previously approved;
Legal & Governance a reduction of 1.8 fte in addition to the 1fte previously
approved:
Customer & Digital a reduction of 4.5fte in addition to the 23.3fte previously
approved:
Strategic Planning, People & Performance reduction in Transformation staffing
budget in additional to the 9fte already approved.
The total reduction in this area including savings already approved from 24/25
would be 13% reduction in fte.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified
Workforce: Reduction as advised in table
Customer: Potential reduction in services to customers both internal and
external.
Equalities/Diversity: No significant impact
Outcome and Performance: Reduced services to a wide range of functions
including income collection.
Climate Change: No significant impact identified.
Page 132 of 274

Page 133

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Organised to Deliver / Transformation 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
3 Regulation - Corporate Health & Safety 0 35 35 1.0 1.0
Strategic
Planning,
People &
Performance
Workforce reduction in the Council's Corporate Health & Safety team resulting
in reduced capacity to provide advice and guidance across the organisation
with regard to H&S law compliance, as well as the ability to undertake
investigations.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage:  No significant impact identified.
Workforce: Staffing reduction of 2 FTE of 7.2FTE
Customer:  Reduced capacity to support Services to comply with the Health
and Safety at Work Act. Response times to incidents and enquiries will
increase.
Equalities/Diversity:  No significant impact identified.
Outcome and Performance: Response times to incidents and enquiries will
increase commensurately.
Climate Change:  No significant impact identified.
Page 133 of 274

Page 134

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Organised to Deliver / Transformation 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
4 Leadership Review - Phase 2 500 500 500
Strategic
Leadership
Team
Phase one of the Leadership Review was considered by the Finance &
Resources Committee in June 2023 and is nearing completion.
Phase two of the Leadership Review will look across the organisation at all
levels of management and supervision with a target of £1.5 million by 2026/27.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified
Workforce: Reduction in number of leaders across the organisation.
Customer: Potential reduction in services to customers both internal and
external.
Equalities/Diversity: No significant impact
Outcome and Performance: Potential impact on performance.
Climate Change: No significant impact identified.
Page 134 of 274

Page 135

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Organised to Deliver / Transformation 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
5 Procurement & Strategic Commissioning 500 500 500
Strategic
Leadership
Team
A transformation review is currently underway in relation to procurement and
strategic commissioning.
This review will target contract management, procurement processes and non-
staff related expenditure with a view to delivering a £1.5 million saving by
2026/27.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified
Workforce: No significant impact
Customer: Potential reduction in services to customers both internal and
external.
Equalities/Diversity: No significant impact
Outcome and Performance: May impact on performance.
Climate Change: No significant impact identified.
Page 135 of 274

Page 136

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2024/25 TO 2026/27
BUDGET REDUCTIONS - Organised to Deliver / Transformation 24/25 25/26 26/27 24/25 25/26 26/27
£'000 £'000 £'000 FTE FTE FTE
Reduction / Income FTE
6 Increased Slippage Target 1,000 0 0
Strategic
Leadership
Team
The Council has previously agreed a corporate slippage target of 4% that is
applied across the whole organisation.
This proposal would see an increase to 5%for all staff groups except teachers.
For some posts there can be no delay in recruitment which may increase the
target further in some areas.
Depending upon where the slippage occurs there may be an impact on service
delivery.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified
Workforce: Delays in filling vacancies may increase pressure on remaining
staff.
Customer: Potential reduction in services to customers both internal and
external.
Equalities/Diversity: No significant impact
Outcome and Performance: Potential reduction in performance.
Climate Change: No significant impact identified.
TOTAL 2,174 1,107 1,485 1.8 3.3 12.0
Page 136 of 274

Page 137

2024/25
REVENUE BUDGET
Fees and Charges
1. Commercial & Domestic Waste 17. Electrical Vehicle Charging
2. North Inch Golf Course 18. Public Transport
3. Football Pitches & Parks Events 19. Housing Management Services
4. Miscellaneous 20. School Meals & Breakfast Clubs
5. Bereavement Services – Burial 21. Childcare Strategy Services
6. Bereavement Services – Cremation 22. School / Community Campus / Astra
Pitches Lets
7. Fleet 23. Instrumental Music Tuition – Central
Groups
8. Smoking 24. Consultancy and Staff Development
9. Litter 25. Wellbank House Rent
10. Road Network Commercial Permit 26. Care and Support Services
11. Trading Standards 27. Design Works
12. Environmental Health 28. Perth & Kinross Licencing Board Fees
Under the Licencing (Scotland) Act 2005
13. Dog Fouling 29. Amended Fees Under Civic Government
(Scotland) Act 1982
14. Parking 30. Democratic Services
15. Planning & Building Standards 31. Human Resources
16. Street Naming & Numbering, Road
Construction Consents & Vehicular Access
3
Page 137 of 274

Page 138

PERTH & KINROSS COUNCIL
CHARGES EFFECTIVE 1ST APRIL 2024 (UNLESS OTHERWISE STATED) - VAT @ 20%
Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
1: COMMERCIAL & DOMESTIC WASTE CHARGES
Bin Size
140 ltr £3.80 £0.00 £3.80 £3.80 £0.00 £3.80
240 ltr £5.25 £0.00 £5.25 £5.25 £0.00 £5.25
330 ltr £6.50 £0.00 £6.50 £6.50 £0.00 £6.50
360 ltr £6.95 £0.00 £6.95 £6.95 £0.00 £6.95
500 ltr £9.85 £0.00 £9.85 £9.85 £0.00 £9.85
660 ltr £12.15 £0.00 £12.15 £12.15 £0.00 £12.15
770 ltr £13.70 £0.00 £13.70 £13.70 £0.00 £13.70
1000 ltr £17.00 £0.00 £17.00 £17.00 £0.00 £17.00
1100 ltr £18.40 £0.00 £18.40 £18.40 £0.00 £18.40
1280 ltr £21.00 £0.00 £21.00 £21.00 £0.00 £21.00
RECYCLING SERVICES (PER CONTAINER/PER UPLIFT)
Glass:
180 ltr Mixed Glass (Only available to existing customers) £3.00 £0.00 £3.00 £3.00 £0.00 £3.00
180 ltr Segregated Clear Glass (Only available to existing customers) £2.00 £0.00 £2.00 £2.10 £0.00 £2.10
180 ltr Segregated Brown Glass (Only available to existing customers) £2.00 £0.00 £2.00 £2.10 £0.00 £2.10
180 ltr Segregated Green Glass (Only available to existing customers) £2.00 £0.00 £2.00 £2.10 £0.00 £2.10
240 ltr Mixed Glass £3.00 £0.00 £3.00 £3.00 £0.00 £3.00
240 ltr Segregated Clear Glass £2.00 £0.00 £2.00 £2.10 £0.00 £2.10
240 ltr Segregated Brown Glass £2.00 £0.00 £2.00 £2.10 £0.00 £2.10
240 ltr Segregated Green Glass £2.00 £0.00 £2.00 £2.10 £0.00 £2.10
Paper & Cardboard
120 ltr (Only available to existing customers) £2.35 £0.00 £2.35 £2.30 £0.00 £2.30
140 ltr £2.35 £0.00 £2.35 £2.30 £0.00 £2.30
240 ltr £2.50 £0.00 £2.50 £2.45 £0.00 £2.45
360 ltr £3.50 £0.00 £3.50 £2.75 £0.00 £2.75
500 ltr £3.60 £0.00 £3.60 £4.00 £0.00 £4.00
660 ltr £3.75 £0.00 £3.75 £4.30 £0.00 £4.30
770 ltr £5.00 £0.00 £5.00 £4.50 £0.00 £4.50
1100 ltr £6.80 £0.00 £6.80 £5.20 £0.00 £5.20
1280 ltr £6.80 £0.00 £6.80 £5.70 £0.00 £5.70
GENERAL WASTE COLLECTION & DISPOSAL CHARGES
(PER CONTAINER/PER UPLIFT)
Page 138 of 274

Page 139

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
Mixed Plastics & Cans:
140 ltr £2.30 £0.00 £2.30 £2.30 £0.00 £2.30
240 ltr £2.45 £0.00 £2.45 £2.45 £0.00 £2.45
360 ltr £2.75 £0.00 £2.75 £2.75 £0.00 £2.75
660 ltr £4.45 £0.00 £4.45 £4.45 £0.00 £4.45
770 ltr £4.75 £0.00 £4.75 £4.75 £0.00 £4.75
1100 ltr £5.65 £0.00 £5.65 £5.65 £0.00 £5.65
Garden Waste:     
240 ltr £4.30 £0.00 £4.30 £4.60 £0.00 £4.60
360 ltr £5.50 £0.00 £5.50 £5.90 £0.00 £5.90
Food Waste:         
120 ltr (Only available to existing customers) £4.70 £0.00 £4.70 £4.70 £0.00 £4.70
140 ltr £4.90 £0.00 £4.90 £4.90 £0.00 £4.90
180 ltr (Only available to existing customers) £5.40 £0.00 £5.40 £5.40 £0.00 £5.40
Front End Loader:
General Waste £105.00 £0.00 £105.00 £90.00 £0.00 £90.00
Paper & Cardboard Recycling £30.00 £0.00 £30.00 £30.00 £0.00 £30.00
Mixed Plastic & Tins Recycling £30.00 £0.00 £30.00
FEL Excess Weight Charge for General Waste (Per Kg) £0.15 £0.00 £0.15 £0.15 £0.00 £0.15
Bells:
Clear Glass £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Brown Glass £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Green Glass £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Mixed Glass £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Waste Transfer Note - Annual Charge £30.00 £0.00 £30.00 £30.00 £0.00 £30.00
(For all commercial uplift customers; covers general waste and recycling waste)
MISCELLANEOUS
Trade Waste Sacks  ( x 50) £103.00 £0.00 £103.00 £103.00 £0.00 £103.00
Trade Waste Sack Delivery Charge £5.00 £0.00 £5.00 £5.00 £0.00 £5.00
Trade Waste Labels  ( x 50) £103.00 £0.00 £103.00 £103.00 £0.00 £103.00
Green Cardboard Labels ( x 50) £59.00 £0.00 £59.00 £59.00 £0.00 £59.00
MPT Sacks ( x 15) £16.00 £0.00 £16.00
Bulky Uplift (allows for up to 5 bulky items) £35.00 £0.00 £35.00 £35.00 £0.00 £35.00
Special Uplift Service - Quote on Request QUOTE ON REQUEST £0.00 QUOTE ON REQUEST QUOTE ON REQUEST £0.00 QUOTE ON REQUEST
Contaminated Bin Uplift £5.00 £0.00 £5.00 £6.00 £0.00 £6.00
Domestic Garden Waste - Annual Permit/Per Bin (Max. 2 x 240 ltr bins per household) £40.00 £0.00 £40.00 £40.00 £0.00 £40.00
Food Waste Recycling Sacks ( x 15) £1.33 £0.27 £1.60 £1.50 £0.30 £1.80
Compostable Caddy Liners ( x 26) £1.04 £0.21 £1.25 £1.04 £0.21 £1.25
Page 139 of 274

Page 140

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
240L Clear Liners ( x 100) £21.00 £4.20 £25.20 £21.00 £4.20 £25.20
Pink Refuse Sack ( x 50) - See Note 2 £3.21 £0.64 £3.85 £3.42 £0.68 £4.10
Development Charges - New Housing Developments:
Provision of Bins -  x3 Bins (including delivery) £90.00 £0.00 £90.00
Provision of Bins -  x4 Bins (including delivery) £110.00 £0.00 £110.00
Provision of Bins - Communal Bin (including delivery) £210.00 £0.00 £210.00
Continental Container Purchase/Delivery/Handling:
140 ltr £20.96 £4.19 £25.15 £21.25 £4.25 £25.50
240 ltr £26.04 £5.21 £31.25 £27.21 £5.44 £32.65
360 ltr £43.00 £8.60 £51.60 £41.04 £8.21 £49.25
360 ltr (lockable) £73.00 £14.60 £87.60 £73.00 £14.60 £87.60
500 ltr £415.00 £83.00 £498.00 £415.00 £83.00 £498.00
660 ltr £415.00 £83.00 £498.00 £396.50 £79.30 £475.80
770 ltr £385.00 £77.00 £462.00 £385.00 £77.00 £462.00
1100 ltr £420.00 £84.00 £504.00 £408.50 £81.70 £490.20
1280 ltr £480.00 £96.00 £576.00 £480.00 £96.00 £576.00
Slam Locks £25.92 £5.18 £31.10 £25.92 £5.18 £31.10
COMMERCIAL BIN RENTAL CHARGES (PER WEEK)
General Waste Bin Rental
140 ltr £0.60 £0.00 £0.60
240 ltr £0.60 £0.00 £0.60
360 ltr £1.00 £0.00 £1.00
500 ltr £2.50 £0.00 £2.50
660 ltr £2.50 £0.00 £2.50
770 ltr £2.50 £0.00 £2.50
1100 ltr £3.00 £0.00 £3.00
1280 ltr £3.50 £0.00 £3.50
Mixed Plastic & Tins Bin Rental
140 ltr £0.60 £0.00 £0.60
240 ltr £0.60 £0.00 £0.60
360 ltr £0.90 £0.00 £0.90
660 ltr £1.25 £0.00 £1.25
770 ltr £1.30 £0.00 £1.30
1100 ltr £1.35 £0.00 £1.35
Garden Waste Bin Rental
140 ltr £0.60 £0.00 £0.60
240 ltr £0.60 £0.00 £0.60
360 ltr £0.90 £0.00 £0.90
Page 140 of 274

Page 141

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
Paper & Cardboard Bin Rental
140 ltr £0.60 £0.00 £0.60
240 ltr £0.60 £0.00 £0.60
360 ltr £0.90 £0.00 £0.90
500 ltr £1.25 £0.00 £1.25
660 ltr £1.25 £0.00 £1.25
770 ltr £1.30 £0.00 £1.30
1100 ltr £1.35 £0.00 £1.35
1280 ltr £1.40 £0.00 £1.40
Food Waste Bin Rental
140 ltr £0.60 £0.00 £0.60
180 ltr £0.60 £0.00 £0.60
Glass Waste Bin Rental
180 ltr £0.60 £0.00 £0.60
240 ltr £0.60 £0.00 £0.60
* Note 1: Prices for customers outwith Perth & Kinross local authority area may vary from above and be subject to change
* Note 2: Pink Sacks - First 100 sacks per year are issued free of charge; additional sacks can be purchased as listed above
* Note 3: Bin Rental Charges - General Waste Bin Rental to be implemented in 2024/25 and all other bin rental charges implemented in 2025/26
PUBLIC CONVENIENCES
Charge per visit £0.50 £0.00 £0.50 £0.50 £0.00 £0.50
WASTE DISCHARGE FACILITIES
Motorhome/Campervan - Charge per empty £10.00 £2.00 £12.00 £10.00 £2.00 £12.00
Timber
Zone
1  -  Up to 5 miles from Friarton £40.00 + £11.00/tonne Applied as appropriate £40.00 + £11.00/tonne £38.00 + £11.00/tonne Applied as appropriate £38.00 + £11.00/tonne
2  -  Between 5 & 20 miles from Friarton £100.00 + £11.00/tonne Applied as appropriate £100.00 + £11.00/tonne £95.00 + £11.00/tonne Applied as appropriate £95.00 + £11.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £220.00 + £11.00/tonne Applied as appropriate £220.00 + £11.00/tonne £210.00 + £11.00/tonne Applied as appropriate £210.00 + £11.00/tonne
COMMERCIAL AND DOMESTIC SKIP HIRE CHARGES FOR
RECYCLABLE AND COMPOSTABLE WASTE IN (8, 10, 12 & 16 CUBE)
Page 141 of 274

Page 142

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
Inert
Zone
1  -  Up to 5 miles from Friarton £40.00 + £25.40/tonne Applied as appropriate £40.00 + £25.40/tonne £38.00 + £24.00/tonne Applied as appropriate £38.00 + £24.00/tonne
2  -  Between 5 & 20 miles from Friarton £100.00 + £25.40/tonne Applied as appropriate £100.00 + £25.40/tonne £95.00 + £24.00/tonne Applied as appropriate £95.00 + £24.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £220.00 + £25.40/tonne Applied as appropriate £220.00 + £25.40/tonne £210.00 + £24.00/tonne Applied as appropriate £210.00 + £24.00/tonne
Metals
Zone
1  -  Up to 5 miles from Friarton £40.00 + £0.00/tonne Applied as appropriate £40.00 + £0.00/tonne £38.00 + £0.00/tonne Applied as appropriate £38.00 + £0.00/tonne
2  -  Between 5 & 20 miles from Friarton £100.00 + £0.00/tonne Applied as appropriate £100.00 + £0.00/tonne £95.00 + £0.00/tonne Applied as appropriate £95.00 + £0.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £220.00 + £0.00/tonne Applied as appropriate £220.00 + £0.00/tonne £210.00 + £0.00/tonne Applied as appropriate £210.00 + £0.00/tonne
Garden
Zone
1  -  Up to 5 miles from Friarton £40.00 + £39.30/tonne Applied as appropriate £40.00 + £39.30/tonne £38.00 + £39.50/tonne Applied as appropriate £38.00 + £39.50/tonne
2  -  Between 5 & 20 miles from Friarton £100.00 + £39.30/tonne Applied as appropriate £100.00 + £39.30/tonne £95.00 + £39.50/tonne Applied as appropriate £95.00 + £39.50/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £220.00 + £39.30/tonne Applied as appropriate £220.00 + £39.30/tonne £210.00 + £39.50/tonne Applied as appropriate £210.00 + £39.50/tonne
Timber
Zone
1  -  Up to 5 miles from Friarton £50.00 + £11.00/tonne Applied as appropriate £50.00 + £11.00/tonne £48.00 + £11.00/tonne Applied as appropriate £48.00 + £11.00/tonne
2  -  Between 5 & 20 miles from Friarton £140.00 + £11.00/tonne Applied as appropriate £140.00 + £11.00/tonne £135.00 + £11.00/tonne Applied as appropriate £135.00 + £11.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £300.00 + £11.00/tonne Applied as appropriate £300.00 + £11.00/tonne £285.00 + £11.00/tonne Applied as appropriate £285.00 + £11.00/tonne
Inert
Zone
1  -  Up to 5 miles from Friarton £50.00 + £25.40/tonne Applied as appropriate £50.00 + £25.40/tonne £48.00 + £24.00/tonne Applied as appropriate £48.00 + £24.00/tonne
2  -  Between 5 & 20 miles from Friarton £140.00 + £25.40/tonne Applied as appropriate £140.00 + £25.40/tonne £135.00 + £24.00/tonne Applied as appropriate £135.00 + £24.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £300.00 + £25.40/tonne Applied as appropriate £300.00 + £25.40/tonne £285.00 + £24.00/tonne Applied as appropriate £285.00 + £24.00/tonne
COMMERCIAL AND DOMESTIC SKIP HIRE CHARGES FOR
RECYCLABLE AND COMPOSTABLE WASTE IN (8, 10, 12 & 16 CUBE)
COMMERCIAL AND DOMESTIC SKIP HIRE CHARGES FOR
RECYCLABLE AND COMPOSTABLE WASTE IN (8, 10, 12 & 16 CUBE)
COMMERCIAL AND DOMESTIC SKIP HIRE CHARGES FOR
RECYCLABLE AND COMPOSTABLE WASTE IN (8, 10, 12 & 16 CUBE)
COMMERCIAL AND DOMESTIC SKIP HIRE CHARGE FOR
RECYCLABLE AND COMPOSTABLE WASTE IN (35 & 40 CUBE)
COMMERCIAL AND DOMESTIC SKIP HIRE CHARGE FOR
RECYCLABLE AND COMPOSTABLE WASTE IN (35 & 40 CUBE)
Page 142 of 274

Page 143

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
Metals
Zone
1  -  Up to 5 miles from Friarton £50.00 + £0.00/tonne Applied as appropriate £50.00 + £0.00/tonne £48.00 + £0/tonne Applied as appropriate £48.00 + £0/tonne
2  -  Between 5 & 20 miles from Friarton £140.00 + £0.00/tonne Applied as appropriate £140.00 + £0.00/tonne £135.00 + £0/tonne Applied as appropriate £135.00 + £0/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £300.00 + £0.00/tonne Applied as appropriate £300.00 + £0.00/tonne £285.00 + £0/tonne Applied as appropriate £285.00 + £0/tonne
Garden
Zone
1  -  Up to 5 miles from Friarton £50.00 + £39.30/tonne Applied as appropriate £50.00 + £39.30/tonne £48.00 + £39.50/tonne Applied as appropriate £48.00 + £39.50/tonne
2  -  Between 5 & 20 miles from Friarton £140.00 + £39.30/tonne Applied as appropriate £140.00 + £39.30/tonne £135.00 + £39.50/tonne Applied as appropriate £135.00 + £39.50/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £300.00 + £39.30/tonne Applied as appropriate £300.00 + £39.30/tonne £285.00 + £39.50/tonne Applied as appropriate £285.00 + £39.50/tonne
COMMERCIAL AND DOMESTIC SKIP EXCESS HIRE CHARGE
Small Skips (8 / 10 / 12 / 16 Cube) - All Locations
Large Skips (35 / 40 Cube) - All Locations
Account Customers (Commercial Waste Uplifts) - All Locations
* Note: Commercial skip hire charges will be Outwith Scope for VAT
* Note: Domestic/Household skip hire charges will be liable for
Standard Rate VAT charge
HOUSEHOLD SKIP HIRE - BLACK BAG GENERAL WASTE (8 & 10 CUBE - MAX CAPACITY 2.5 TONNES)
Zone
1  -  Less than 5 miles from Friarton £40.00 + £136.50/tonne Applied to total charge £40.00 + £136.50/tonne £38.00 + £136.50/tonne Applied to total charge £38.00 + £136.50/tonne
2  -  Between 5 & 20 miles from Friarton £100.00 + £136.50/tonne Applied to total charge £100.00 + £136.50/tonne £95.00 + £136.50/tonne Applied to total charge £95.00 + £136.50/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £220.00 + £136.50/tonne Applied to total charge £220.00 + £136.50/tonne £210.00 + £136.50/tonne Applied to total charge £210.00 + £136.50/tonne
HOUSEHOLD SKIP HIRE - WUDS BULKY GENERAL WASTE (8 & 10 CUBE - MAX CAPACITY 2.5 TONNES)
Zone
1  -  Less than 5 miles from Friarton £38.00 + £270.20/tonne Applied to total charge £38.00 + £270.20/tonne
2  -  Between 5 & 20 miles from Friarton £95.00 + £270.20/tonne Applied to total charge £95.00 + £270.20/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £270.20/tonne Applied to total charge £210.00 + £270.20/tonne
Full 7 day hire charge (listed above) will be
applied for each additional 7 days or part thereof
28 Days of skip on site will be allowed within 7 day hire charge (listed above)
COMMERCIAL AND DOMESTIC SKIP HIRE CHARGE FOR
RECYCLABLE AND COMPOSTABLE WASTE IN (35 & 40 CUBE)
COMMERCIAL AND DOMESTIC SKIP HIRE CHARGE FOR
RECYCLABLE AND COMPOSTABLE WASTE IN (35 & 40 CUBE)
28 Days of skip on site will be allowed within 7 day hire charge (listed above)
Full 7 day hire charge (listed above) will be
applied for each additional 7 days or part thereof
Page 143 of 274

Page 144

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
HOUSEHOLD SKIP HIRE - BULKY GENERAL WASTE (8 & 10 CUBE - MAX CAPACITY 2.5 TONNES)
Zone
1  -  Less than 5 miles from Friarton £40.00 + £164.50/tonne Applied to total charge £40.00 + £164.50/tonne £38.00 + £166.00/tonne Applied to total charge £38.00 + £166.00/tonne
2  -  Between 5 & 20 miles from Friarton £100.00 + £164.50/tonne Applied to total charge £100.00 + £164.50/tonne £95.00 + £166.00/tonne Applied to total charge £95.00 + £166.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £220.00 + £164.50/tonne Applied to total charge £220.00 + £164.50/tonne £210.00 + £166.00/tonne Applied to total charge £210.00 + £166.00/tonne
HOUSEHOLD SKIP HIRE - BLACK BAG GENERAL WASTE (12 CUBE - MAX CAPACITY 4 TONNES)
Zone
1  -  Less than 5 miles from Friarton £40.00 + £136.50/tonne Applied to total charge £40.00 + £136.50/tonne £38.00 + £136.50/tonne Applied to total charge £38.00 + £136.50/tonne
2  -  Between 5 & 20 miles from Friarton £100.00 + £136.50/tonne Applied to total charge £100.00 + £136.50/tonne £95.00 + £136.50/tonne Applied to total charge £95.00 + £136.50/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £220.00 + £136.50/tonne Applied to total charge £220.00 + £136.50/tonne £210.00 + £136.50/tonne Applied to total charge £210.00 + £136.50/tonne
HOUSEHOLD SKIP HIRE - WUDS BULKY GENERAL WASTE (12 CUBE - MAX CAPACITY 4 TONNES)
Zone
1  -  Less than 5 miles from Friarton £38.00 + £270.20/tonne Applied to total charge £38.00 + £270.20/tonne
2  -  Between 5 & 20 miles from Friarton £95.00 + £270.20/tonne Applied to total charge £95.00 + £270.20/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £270.20/tonne Applied to total charge £210.00 + £270.20/tonne
HOUSEHOLD SKIP HIRE - BULKY GENERAL WASTE (12 CUBE - MAX CAPACITY 4 TONNES)
Zone
1  -  Less than 5 miles from Friarton £40.00 + £164.50/tonne Applied to total charge £40.00 + £164.50/tonne £38.00 + £166.00/tonne Applied to total charge £38.00 + £166.00/tonne
2  -  Between 5 & 20 miles from Friarton £100.00 + £164.50/tonne Applied to total charge £100.00 + £164.50/tonne £95.00 + £166.00/tonne Applied to total charge £95.00 + £166.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £220.00 + £164.50/tonne Applied to total charge £220.00 + £164.50/tonne £210.00 + £166.00/tonne Applied to total charge £210.00 + £166.00/tonne
HOUSEHOLD SKIP HIRE - BLACK BAG GENERAL WASTE (16 CUBE - MAX CAPACITY 5 TONNES)
Zone
1  -  Less than 5 miles from Friarton £40.00 + £136.50/tonne Applied to total charge £40.00 + £136.50/tonne £38.00 + £136.50/tonne Applied to total charge £38.00 + £136.50/tonne
2  -  Between 5 & 20 miles from Friarton £100.00 + £136.50/tonne Applied to total charge £100.00 + £136.50/tonne £95.00 + £136.50/tonne Applied to total charge £95.00 + £136.50/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £220.00 + £136.50/tonne Applied to total charge £220.00 + £136.50/tonne £210.00 + £136.50/tonne Applied to total charge £210.00 + £136.50/tonne
HOUSEHOLD SKIP HIRE - WUDS BULKY GENERAL WASTE (16 CUBE - MAX CAPACITY 5 TONNES)
Zone
1  -  Less than 5 miles from Friarton £38.00 + £270.20/tonne Applied to total charge £38.00 + £270.20/tonne
2  -  Between 5 & 20 miles from Friarton £95.00 + £270.20/tonne Applied to total charge £95.00 + £270.20/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £270.20/tonne Applied to total charge £210.00 + £270.20/tonne
Page 144 of 274

Page 145

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
HOUSEHOLD SKIP HIRE - BULKY GENERAL WASTE (16 CUBE - MAX CAPACITY 5 TONNES)
Zone
1  -  Less than 5 miles from Friarton £40.00 + £164.50/tonne Applied to total charge £40.00 + £164.50/tonne £38.00 + £166.00/tonne Applied to total charge £38.00 + £166.00/tonne
2  -  Between 5 & 20 miles from Friarton £100.00 + £164.50/tonne Applied to total charge £100.00 + £164.50/tonne £95.00 + £166.00/tonne Applied to total charge £95.00 + £166.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £220.00 + £164.50/tonne Applied to total charge £220.00 + £164.50/tonne £210.00 + £166.00/tonne Applied to total charge £210.00 + £166.00/tonne
COMMERCIAL SKIP HIRE - BLACK BAG GENERAL WASTE (UP TO 16 CUBE)
Zone
1  -  Up to 5 miles from Friarton £40.00 + £136.50/tonne £0.00 £40.00 + £136.50/tonne £38.00 + £136.50/tonne £0.00 £38.00 + £136.50/tonne
2  -  Between 5 & 20 miles from Friarton £100.00 + £136.50/tonne £0.00 £100.00 + £136.50/tonne £95.00 + £136.50/tonne £0.00 £95.00 + £136.50/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £220.00 + £136.50/tonne £0.00 £220.00 + £136.50/tonne £210.00 + £136.50/tonne £0.00 £210.00 + £136.50/tonne
COMMERCIAL SKIP HIRE - BULKY GENERAL WASTE (UP TO 16 CUBE)
Zone
1  -  Up to 5 miles from Friarton £40.00 + £164.50/tonne £0.00 £40.00 + £164.50/tonne £38.00 + £166.00/tonne £0.00 £38.00 + £166.00/tonne
2  -  Between 5 & 20 miles from Friarton £100.00 + £164.50/tonne £0.00 £100.00 + £164.50/tonne £95.00 + £166.00/tonne £0.00 £95.00 + £166.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £220.00 + £164.50/tonne £0.00 £220.00 + £164.50/tonne £210.00 + £166.00/tonne £0.00 £210.00 + £166.00/tonne
COMMERCIAL SKIP HIRE - WUDS BULKY GENERAL WASTE (UP TO 16 CUBE)
Zone
1  -  Less than 5 miles from Friarton £38.00 + £270.20/tonne Applied to total charge £38.00 + £270.20/tonne
2  -  Between 5 & 20 miles from Friarton £95.00 + £270.20/tonne Applied to total charge £95.00 + £270.20/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £270.20/tonne Applied to total charge £210.00 + £270.20/tonne
COMMERCIAL SKIP HIRE - MIXED PLASTICS & TINS (UP TO 16 CUBE)
Zone
1  -  Up to 5 miles from Friarton £38.00 + £21.50/tonne £0.00 £38.00 + £21.50/tonne
2  -  Between 5 & 20 miles from Friarton £95.00 + £21.50/tonne £0.00 £95.00 + £21.50/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £21.50/tonne £0.00 £210.00 + £21.50/tonne
COMMERCIAL SKIP HIRE - PAPER & CARDBOARD (UP TO 16 CUBE)
Zone
1  -  Up to 5 miles from Friarton £38.00 + £28.00/tonne £0.00 £38.00 + £28.00/tonne
2  -  Between 5 & 20 miles from Friarton £95.00 + £28.00/tonne £0.00 £95.00 + £28.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £28.00/tonne £0.00 £210.00 + £28.00/tonne
Page 145 of 274

Page 146

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
COMMERCIAL FOOD WASTE COMMERCIAL SKIP HIRE (UP TO 16 CUBE)
Zone
1  -  Up to 5 miles from Friarton £40.00 + £24.00/tonne £0.00 £40.00 + £24.00/tonne £38.00 + £21.00/tonne £0.00 £38.00 + £21.00/tonne
2  -  Between 5 & 20 miles from Friarton £100.00 + £24.00/tonne £0.00 £100.00 + £24.00/tonne £95.00 + £21.00/tonne £0.00 £95.00 + £21.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £220.00 + £24.00/tonne £0.00 £220.00 + £24.00/tonne £210.00 + £21.00/tonne £0.00 £210.00 + £21.00/tonne
COMMERCIAL SKIP HIRE - BLACK BAG GENERAL WASTE (35 & 40 CUBE)
Zone
1  -  Up to 5 miles from Friarton £50.00 + £136.50/tonne £0.00 £50.00 + £136.50/tonne £48.00 + £136.50/tonne £0.00 £48.00 + £136.50/tonne
2  -  Between 5 & 20 miles from Friarton £140.00 + £136.50/tonne £0.00 £140.00 + £136.50/tonne £135.00 + £136.50/tonne £0.00 £135.00 + £136.50/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £300.00 + £136.50/tonne £0.00 £300.00 + £136.50/tonne £285.00 + £136.50/tonne £0.00 £285.00 + £136.50/tonne
COMMERCIAL SKIP HIRE - BULKY GENERAL WASTE (35 & 40 CUBE)
Zone
1  -  Up to 5 miles from Friarton £50.00 + £164.50/tonne £0.00 £50.00 + £164.50/tonne £48.00 + £166.00/tonne £0.00 £48.00 + £166.00/tonne
2  -  Between 5 & 20 miles from Friarton £140.00 + £164.50/tonne £0.00 £140.00 + £164.50/tonne £135.00 + £166.00/tonne £0.00 £135.00 + £166.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £300.00 + £164.50/tonne £0.00 £300.00 + £164.50/tonne £285.00 + £166.00/tonne £0.00 £285.00 + £166.00/tonne
COMMERCIAL SKIP HIRE - WUDS BULKY GENERAL WASTE (35 & 40 CUBE)
Zone
1  -  Less than 5 miles from Friarton £48.00 + £270.20/tonne Applied to total charge £48.00 + £270.20/tonne
2  -  Between 5 & 20 miles from Friarton £135.00 + £270.20/tonne Applied to total charge £135.00 + £270.20/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £285.00 + £270.20/tonne Applied to total charge £285.00 + £270.20/tonne
COMMERCIAL SKIP HIRE - MIXED PLASTICS & TINS (35 & 40 CUBE)
Zone
1  -  Up to 5 miles from Friarton £48.00 + £21.50/tonne £0.00 £48.00 + £21.50/tonne
2  -  Between 5 & 20 miles from Friarton £135.00 + £21.50/tonne £0.00 £135.00 + £21.50/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £285.00 + £21.50/tonne £0.00 £285.00 + £21.50/tonne
COMMERCIAL SKIP HIRE - PAPER & CARDBOARD (35 & 40 CUBE)
Zone
1  -  Up to 5 miles from Friarton £48.00 + £28.00/tonne £0.00 £48.00 + £28.00/tonne
2  -  Between 5 & 20 miles from Friarton £135.00 + £28.00/tonne £0.00 £135.00 + £28.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £285.00 + £28.00/tonne £0.00 £285.00 + £28.00/tonne
Page 146 of 274

Page 147

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
COMMERCIAL AND HOUSEHOLD SKIP EXCESS HIRE CHARGE
Small Skips (8 / 10 / 12 / 16 Cube) - All Locations
Large Skips (35 / 40 Cube) - All Locations
Account Customers (Commercial Waste Uplifts) - All Locations
BLACK BAG GENERAL WASTE TIPPING AT RECYCLING CENTRES
Category 1 - Light Van -  Part Load £30.38 £6.07 £36.45 £30.38 £6.07 £36.45
Category 1 - Light Van -  Full Load £60.71 £12.14 £72.85 £60.71 £12.14 £72.85
Category 2 - Panel Van or Small Trailer (up to 1/2 tonne) - Part Load £44.71 £8.94 £53.65 £44.71 £8.94 £53.65
Category 2 - Panel Van or Small Trailer (up to 1/2 tonne) - Full Load £89.42 £17.88 £107.30 £89.42 £17.88 £107.30
Category 3 - Large Trailer (over 1/2 tonne) - Part Load £48.79 £9.76 £58.55 £48.79 £9.76 £58.55
Category 3 - Large Trailer (over 1/2 tonne) - Full Load £97.58 £19.52 £117.10 £97.58 £19.52 £117.10
BULKY GENERAL WASTE TIPPING AT RECYCLING CENTRES
Category 1 - Light Van -  Part Load £36.38 £7.27 £43.65 £36.79 £7.36 £44.15
Category 1 - Light Van -  Full Load £72.71 £14.54 £87.25 £73.54 £14.71 £88.25
Category 2 - Panel Van or Small Trailer (up to 1/2 tonne) - Part Load £53.67 £10.73 £64.40 £54.21 £10.84 £65.05
Category 2 - Panel Van or Small Trailer (up to 1/2 tonne) - Full Load £107.25 £21.45 £128.70 £108.42 £21.68 £130.10
Category 3 - Large Trailer (over 1/2 tonne) - Part Load £58.54 £11.71 £70.25 £59.21 £11.84 £71.05
Category 3 - Large Trailer (over 1/2 tonne) - Full Load £117.08 £23.42 £140.50 £118.33 £23.67 £142.00
WUDS BULKY GENERAL WASTE TIPPING AT RECYCLING CENTRES
Category 1 - Light Van -  Part Load £59.21 £11.84 £71.05
Category 1 - Light Van -  Full Load £118.42 £23.68 £142.10
Category 2 - Panel Van or Small Trailer (up to 1/2 tonne) - Part Load £87.58 £17.52 £105.10
Category 2 - Panel Van or Small Trailer (up to 1/2 tonne) - Full Load £175.17 £35.03 £210.20
Category 3 - Large Trailer (over 1/2 tonne) - Part Load £95.71 £19.14 £114.85
Category 3 - Large Trailer (over 1/2 tonne) - Full Load £191.33 £38.27 £229.60
GARDEN WASTE TIPPING AT RECYCLING CENTRES
Category 1 - Light Van -  Part Load £9.00 £1.80 £10.80 £9.21 £1.84 £11.05
Category 1 - Light Van - Full Load £18.00 £3.60 £21.60 £18.29 £3.66 £21.95
Category 2 - Panel Van or Small Trailer (up to 1/2 tonne) - Part Load £11.75 £2.35 £14.10 £11.96 £2.39 £14.35
Category 2 - Panel Van or Small Trailer (up to 1/2 tonne) - Full Load £23.50 £4.70 £28.20 £23.92 £4.78 £28.70
Category 3 - Large Trailer (over 1/2 tonne) - Part Load £17.46 £3.49 £20.95 £17.67 £3.53 £21.20
Category 3 - Large Trailer (over 1/2 tonne) - Full Load £34.92 £6.98 £41.90 £35.29 £7.06 £42.35
Full 7 day hire charge (listed above) will be
applied for each additional 7 days or part thereof
28 Days of skip on site will be allowed within 7 day hire charge (listed above)
Full 7 day hire charge (listed above) will be
applied for each additional 7 days or part thereof
28 Days of skip on site will be allowed within 7 day hire charge (listed above)
Page 147 of 274

Page 148

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
INERT WASTE TIPPING AT RECYCLING CENTRES
Category 1 - Light Van -  Part Load £9.46 £1.89 £11.35 £9.46 £1.89 £11.35
Category 1 - Light Van - Full Load £18.92 £3.78 £22.70 £18.92 £3.78 £22.70
Category 2 - Panel Van or Small Trailer (up to 1/2 tonne) - Part Load £12.67 £2.53 £15.20 £12.67 £2.53 £15.20
Category 2 - Panel Van or Small Trailer (up to 1/2 tonne) - Full Load £25.25 £5.05 £30.30 £25.25 £5.05 £30.30
Category 3 - Large Trailer (over 1/2 tonne) - Part Load £13.92 £2.78 £16.70 £13.92 £2.78 £16.70
Category 3 - Large Trailer (over 1/2 tonne) - Full Load £27.79 £5.56 £33.35 £27.79 £5.56 £33.35
TIMBER WASTE TIPPING AT RECYCLING CENTRES
Category 1 - Light Van - Full Load £4.71 £0.94 £5.65 £4.96 £0.99 £5.95
Category 2 - Panel Van or Small Trailer (up to 1/2 tonne) - Full Load £7.92 £1.58 £9.50 £8.33 £1.67 £10.00
Category 3 - Large Trailer (over 1/2 tonne) - Full Load £11.04 £2.21 £13.25 £11.67 £2.33 £14.00
FRIARTON WEIGHBRIDGE (PER TONNE)
Inert Waste £25.42/tonne £5.08/tonne £30.50/tonne £24.00/tonne £4.80/tonne £28.80/tonne
Garden Waste £39.29/tonne £7.86/tonne £47.15/tonne £39.50/tonne £7.90/tonne £47.40/tonne
General Black Bag Waste £136.50/tonne £27.30/tonne £163.80/tonne £136.50/tonne £27.30/tonne £163.80/tonne
Bulky General Waste £164.50/tonne £32.90/tonne £197.40/tonne £166.00/tonne £33.20/tonne £199.20/tonne
Timber Waste £11.00/tonne £2.20/tonne £13.20/tonne £11.00/tonne £2.20/tonne £13.20/tonne
WUDS Bulky General Waste £270.21/tonne £54.04/tonne £324.25/tonne
NOTES
1 Commercial skip hire charges will be Outwith Scope for VAT.
2 Domestic/Household skip hire charges will be liable for Standard Rate VAT charge.
3 Bulky General Waste - examples include: furniture, sofa, chair, bed, mattress, white goods etc.
4 Contaminated Paper & Card / MPT skips will be charged at General Black Bag Waste rates.
5 WUDS (Waste Upholstered Domestic Seating) - examples include: sofa/sofa beds, armchairs, office chairs, kitchen/dining room chairs, recliners, floor and futons.
Page 148 of 274

Page 149

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
2:   NORTH INCH GOLF COURSE CHARGES
FULL SEASON TICKET (7 DAY TICKET) - 1ST APRIL - 31ST MARCH
Adult £399.00 £0.00 £399.00 £409.00 £0.00 £409.00
Senior/Concession £349.00 £0.00 £349.00 £359.00 £0.00 £359.00
Youth (18 - 21yrs) £95.00 £0.00 £95.00 £99.00 £0.00 £99.00
Intermediate (22 - 25yrs) £155.00 £0.00 £155.00 £160.00 £0.00 £160.00
Young Adult (26 -29yrs) £249.00 £0.00 £249.00 £259.00 £0.00 £259.00
Junior (17 yrs and under) £20.00 £0.00 £20.00 £20.00 £0.00 £20.00
Senior (80+ yrs) £259.00 £0.00 £259.00
Senior (90+ yrs) £20.00 £0.00 £20.00
18 MONTHS FOR THE PRICE OF 12
Adult (1st October each year) £399.00 £0.00 £399.00 £409.00 £0.00 £409.00
Senior/Concession (1st October each year) £349.00 £0.00 £349.00 £359.00 £0.00 £359.00
Young Adult (1st October each year) £249.00 £0.00 £249.00 £259.00 £0.00 £259.00
Intermediate (1st October each year) £155.00 £0.00 £155.00 £160.00 £0.00 £160.00
Youth (1st October each year) £95.00 £0.00 £95.00 £99.00 £0.00 £99.00
Junior (1st October each year) £20.00 £0.00 £20.00 £20.00 £0.00 £20.00
Senior (80+ yrs) £259.00 £0.00 £259.00
Senior (90+ yrs) £20.00 £0.00 £20.00
Family Membership - 1 free junior season ticket with purchase of Adult/Senior ticket £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Get into Golf - Restricted times of play on full golf course - 2 year only before upgrading £139.00 £0.00 £139.00 £145.00 £0.00 £145.00
Corporate Golf Season Ticket - golf day for up to 20 players plus 50 green fee vouchers £1,000.00 £200.00 £1,200.00 £1,000.00 £200.00 £1,200.00
SUMMER 18 HOLE ROUNDS 1ST APRIL TO 31ST OCT
Adult (weekday) £24.00 £0.00 £24.00 £26.00 £0.00 £26.00
Adult (weekend) £28.00 £0.00 £28.00 £30.00 £0.00 £30.00
Adult 10 round ticket £200.00 £0.00 £200.00 £215.00 £0.00 £215.00
One Week Multi Play Ticket £60.00 £0.00 £60.00 £64.00 £0.00 £64.00
One Month Multi Play Ticket £115.00 £0.00 £115.00 £120.00 £0.00 £120.00
Senior/Concession (weekday) £23.00 £0.00 £23.00 £25.00 £0.00 £25.00
Senior/Concession (weekend) £27.00 £0.00 £27.00 £29.00 £0.00 £29.00
Senior/Concession 10 round ticket £189.00 £0.00 £189.00 £199.00 £0.00 £199.00
Members Guest (any day) £16.00 £0.00 £16.00 £17.00 £0.00 £17.00
Twilight (weekday after 5.30pm) £21.00 £0.00 £21.00 £23.00 £0.00 £23.00
Twilight (weekend after 3pm) £23.00 £0.00 £23.00 £25.00 £0.00 £25.00
Junior (17 yrs and under weekday) £5.00 £0.00 £5.00 £5.00 £0.00 £5.00
Junior (17 yrs and under weekend) £5.00 £0.00 £5.00 £5.00 £0.00 £5.00
Short Course Adult/Senior/Concession Round £6.00 £0.00 £6.00 £6.00 £0.00 £6.00
Short Course Junior Round £3.00 £0.00 £3.00 £3.00 £0.00 £3.00
Family Ticket - 1 free junior greenfee with purchase of Adult / Senior greenfee £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Page 149 of 274

Page 150

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
SUMMER 9 HOLE ROUNDS 1ST APRIL TO 31ST OCT (1HR 45 MIN MAXIMUM PLAY)
Adult weekday £15.00 £0.00 £15.00 £16.00 £0.00 £16.00
Adult weekend £17.00 £0.00 £17.00 £18.00 £0.00 £18.00
Senior/Concession weekday £13.00 £0.00 £13.00 £14.00 £0.00 £14.00
Senior/Concession weekend £15.00 £0.00 £15.00 £16.00 £0.00 £16.00
Family Ticket - 1 free junior greenfee with purchase of Adult/Senior greenfee £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
SUMMER 6 HOLE ROUNDS 1ST APRIL TO 31ST OCT (1HR 10MINS MAXIMUM PLAY)
Adult weekday £8.50 £0.00 £8.50 £9.00 £0.00 £9.00
Adult weekend £10.50 £0.00 £10.50 £11.00 £0.00 £11.00
Senior/Concession weekday £7.50 £0.00 £7.50 £8.00 £0.00 £8.00
Senior/Concession weekend £8.50 £0.00 £8.50 £9.00 £0.00 £9.00
Family Ticket - 1 free junior greenfee with purchase of Adult/Senior greenfee £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
WINTER ROUNDS 1ST  NOV TO 31ST MARCH
Adult (any day) £17.00 £0.00 £17.00 £18.00 £0.00 £18.00
Senior/Concession (any day) £17.00 £0.00 £17.00 £18.00 £0.00 £18.00
Members Guest (any day) £9.00 £0.00 £9.00 £9.50 £0.00 £9.50
Junior (17 yrs and under any day) £5.00 £0.00 £5.00 £5.00 £0.00 £5.00
Winter Greens (all categories) £9.00 £0.00 £9.00 £9.50 £0.00 £9.50
Family Ticket - 1 free junior greenfee with purchase of Adult/Senior greenfee £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
GROUP DISCOUNT (SUMMER ONLY)
All categories (weekday -min 8 required) £22.00 £0.00 £22.00 £24.00 £0.00 £24.00
All categories (weekend -min 8 required) £24.00 £0.00 £24.00 £26.00 £0.00 £26.00
Online Adult Off Peak weekday 4 ball deal (11am-2pm) £80.00 £0.00 £80.00 £86.00 £0.00 £86.00
Online Adult Off Peak weekday 2 ball deal (11am-2pm) £44.00 £0.00 £44.00 £48.00 £0.00 £48.00
Online Adult Off Peak weekend 4 ball deal (11am-2pm) £92.00 £0.00 £92.00 £98.00 £0.00 £98.00
Online Adult Off Peak weekend 2 ball deal (11am-2pm) £50.00 £0.00 £50.00 £54.00 £0.00 £54.00
MISCELLANEOUS
- Trolley HireTrolley Hire £3.75 £0.75 £4.50 £4.17 £0.83 £5.00
- Buggy HireBuggy Hire £14.58 £2.92 £17.50 £15.42 £3.08 £18.50
- PuttingPutting £1.00 £0.00 £1.00 £1.50 £0.00 £1.50
- FootballFootball £0.83 £0.17 £1.00 £0.83 £0.17 £1.00
Page 150 of 274

Page 151

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
FOOTGOLF / SOFTBALL GOLF / PARK GOLF ROUNDS 1ST APRIL TO 31ST MAR
Footgolf Adult 9 holes £7.00 £0.00 £7.00 £7.00 £0.00 £7.00
Footgolf Adult 18 holes £10.00 £0.00 £10.00 £10.00 £0.00 £10.00
Footgolf Senior/Concession 9 holes £6.00 £0.00 £6.00 £6.00 £0.00 £6.00
Footgolf Senior/Concession 18 holes £9.00 £0.00 £9.00 £9.00 £0.00 £9.00
Footgolf Junior 9 holes £4.00 £0.00 £4.00 £4.00 £0.00 £4.00
Footgolf Junior 18 holes £5.00 £0.00 £5.00 £5.00 £0.00 £5.00
Footgolf Family 9 holes (2x Adults & 2x Juniors) £16.00 £0.00 £16.00 £16.00 £0.00 £16.00
Footgolf Family 18 holes (2x Adults & 2x Juniors) £20.00 £0.00 £20.00 £20.00 £0.00 £20.00
FOOTGOLF / SOFTBALL GOLF / PARK GOLF GROUPS AND PROMOTIONS 1ST APRIL TO 31ST MAR
Footgolf Adult 4 ball deal 9 holes £22.00 £0.00 £22.00 £22.00 £0.00 £22.00
Footgolf Adult 4 ball deal 18 holes £30.00 £0.00 £30.00 £30.00 £0.00 £30.00
Footgolf Adult Group 18 holes (min 8 required) £7.00 £0.00 £7.00 £7.00 £0.00 £7.00
Footgolf Senior/Concession Group 18 holes (min 8 required) £6.00 £0.00 £6.00 £6.00 £0.00 £6.00
Footgolf Junior Group 18 holes (min 8 required) £4.00 £0.00 £4.00 £4.00 £0.00 £4.00
Note 1: some flexibility may be applied in daily green fee rates depending on demand and capacity.
3:   FOOTBALL PITCHES & PARKS EVENTS CHARGES
PERTH FOOTBALL / RUGBY PITCHES
Adult (Season 11 a-side incl changing facilities where available & training) £0.00 £0.00 £0.00 £578.00 £0.00 £578.00
Adult (Per Game 11 a-side) £0.00 £0.00 £0.00 £48.00 £0.00 £48.00
Adult (Season 7 a-side) £0.00 £0.00 £0.00 £336.00 £0.00 £336.00
Adult (Per Game 7 a-side) £0.00 £0.00 £0.00 £28.00 £0.00 £28.00
Junior Under 18 Years (Season 11 a-side incl changing facilities where available & training) £0.00 £0.00 £0.00 £241.00 £0.00 £241.00
Junior Under 18 Years (Per Game 11 a-side) £0.00 £0.00 £0.00 £19.00 £0.00 £19.00
Junior Under 18 Years (Season 7 a-side) £0.00 £0.00 £0.00 £145.00 £0.00 £145.00
Junior Under 18 Years (Per Game 7 a-side) £0.00 £0.00 £0.00 £12.00 £0.00 £12.00
OUTWITH PERTH FOOTBALL / RUGBY PITCHES
Adult (Season 11 a-side incl changing facilities where available & training) £0.00 £0.00 £0.00 £441.00 £0.00 £441.00
Adult (Per Game 11 a-side) £0.00 £0.00 £0.00 £37.00 £0.00 £37.00
Junior Under 18 Years (Season 11 a-side incl changing facilities where available & training) £0.00 £0.00 £0.00 £218.00 £0.00 £218.00
Junior Under 18 Years (Per Game 11 a-side) £0.00 £0.00 £0.00 £18.00 £0.00 £18.00
Junior Under 18 Years (Season 7 a-side) £0.00 £0.00 £0.00 £109.00 £0.00 £109.00
Junior Under 18 Years (Per Game 7 a-side) £0.00 £0.00 £0.00 £10.00 £0.00 £10.00
Note 2: Catering for groups or parties - indoor facilities (free of charge) on request
dependent on availability, catering will be outsourced to a third party supplier to be
paid directly by the group/customer.
Page 151 of 274

Page 152

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
PARKS EVENTS
Commercial Bookings Per Day (North Inch, South Inch & Lesser South Inch) £367.00 £0.00 £367.00 £382.00 £0.00 £382.00
Commercial Bookings Per Day (Other parks & opens spaces across Perth & Kinross) £150.00 £0.00 £150.00 £156.00 £0.00 £156.00
Commercial Bookings Refundable Deposit (subject to recovery of any costs incurred) £546.00 £0.00 £546.00 £568.00 £0.00 £568.00
Non Commercial Bookings (up to 100 expected attendees) £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Non Commercial Bookings (101 to 500 expected attendees) £61.00 £0.00 £61.00 £63.00 £0.00 £63.00
Non Commercial Bookings (501 to 1000 expected attendees) £91.00 £0.00 £91.00 £95.00 £0.00 £95.00
Non Commercial Bookings (1000+ expected attendees) £121.00 £0.00 £121.00 £126.00 £0.00 £126.00
Balloon Flights £25.00 £0.00 £25.00 £26.00 £0.00 £26.00
Small Enterprise Commercial Bookings £62.00 £0.00 £62.00 £65.00 £0.00 £65.00
Water Supply Test and Flush (Prior to event) - see Note 4 £210.00 £0.00 £210.00
Refundable Deposit For Large Events (Reinstatement Works) £5,000.00 £0.00 £5,000.00 £5,000.00 £0.00 £5,000.00
Facilities Cleaning Recharge Full Cost Recovery Full Cost Recovery Full Cost Recovery Full Cost Recovery Full Cost Recovery Full Cost Recovery
Mobile Food Operators - fee per month £150.00 £0.00 £150.00 £156.00 £0.00 £156.00
Non-commercial bookings = £25   
Commercial bookings = 25% of booking fee
4:   MISCELLANEOUS CHARGES
Caravan Rallies - Outwith Caravan Parks Per Van Per Night £8.33 £1.67 £10.00 £9.17 £1.83 £11.00
Liberation of Pigeons - Per vehicle £25.00 £5.00 £30.00 £25.83 £5.17 £31.00
Purchase of Memorial Bench (with plaque) - New Glen Almond Bench £769.17 £153.83 £923.00 £818.33 £163.67 £982.00
Purchase of Memorial Bench (with plaque) - New Glen Clova Bench £959.17 £191.83 £1,151.00 £1,020.00 £204.00 £1,224.00
Purchase of Memorial Bench (with plaque) - Greenspace Bench £590.00 £118.00 £708.00 £627.50 £125.50 £753.00
Purchase of Memorial Bench (with plaque) - Phoenix Recycled Plastic Bench £701.67 £140.33 £842.00 £746.67 £149.33 £896.00
£168.33 £33.67 £202.00 £175.00 £35.00 £210.00
Purchase of Memorial Tree (including planting - see note 3) Cost Recovery Cost Recovery Cost Recovery Cost Recovery
Note 1: Purchase of a memorial bench covers the life of the bench only.
Note 2: Memorial bench is supplied with brass plaque as standard - stainless steel
plaque will incur additional charge.
Note 3: Memorial Tree - charges will be recharge of costs, quotations supplied
depending on tree variety etc.
Note 1:  Football / Rugby Pitches - 20% discount will be given for Season bookings if
paid in one payment by specified cut-off date.
Note 2: Event Parking  -  25% of all parking charges levied by event organisers will be
passed to the Council where vehicles have been parked on public greenspace.
Note 3: Event Bookings - late bookings will incur a surcharge:
Purchase of Plaque - For Existing Bench (includes plaque, fitting and contribution to cost of
bench)
Note 4: Water Supply Test and Flush only available where there is a water supply on site.
Page 152 of 274

Page 153

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
5:   BEREAVEMENT SERVICES - BURIAL CHARGES
SALE OF LAIRS
Full Lair - Young Person (under 21yrs) £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Full Lair - Adult (21yrs & over) * £962.00 £0.00 £962.00 £1,000.00 £0.00 £1,000.00
Half Lair (where available) - Young Person (under 21yrs) £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Half Lair (where available) - Adult (21yrs & over) * £481.00 £0.00 £481.00 £500.00 £0.00 £500.00
Quarter Lair (where available) - For Baby or NVF only -  Young Person (under 21yrs) £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Transfer of Lair Ownership £40.00 £0.00 £40.00 £42.00 £0.00 £42.00
INTERMENT FEES
Young Person (under 21yrs) £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Adult (21yrs & over) - Note 1 £1,003.00 £0.00 £1,003.00 £1,043.00 £0.00 £1,043.00
Cremated Remains (Casket Burial) - Note 1 £232.00 £0.00 £232.00 £241.00 £0.00 £241.00
Scattered Ashes (under turf) - Note 1 £75.00 £0.00 £75.00 £78.00 £0.00 £78.00
Muslim Burial (Where additional requirements apply) Cost Recovery Cost Recovery Cost Recovery Cost Recovery Cost Recovery Cost Recovery
Exhumation - Note 2 Cost Recovery Cost Recovery Cost Recovery Cost Recovery Cost Recovery Cost Recovery
Excavation of Foundation for Erecting Headstone (New/On Request) - Note 3 £164.17 £32.83 £197.00 £170.83 £34.17 £205.00
Removal of Old Foundation (Prior to excavation of new foundation/headstone) £20.83 £4.17 £25.00 £20.83 £4.17 £25.00
Marking Grave for Placement of Small Memorial/ Grave Location Request - Note 4 £77.50 £15.50 £93.00 £80.83 £16.17 £97.00
Memorial Mason Registration - Annual Charge £185.00 £0.00 £185.00 £193.00 £0.00 £193.00
Memorial Mason Registration - Charge Per Visit £38.00 £0.00 £38.00 £40.00 £0.00 £40.00
Memorial Levy £76.00 £0.00 £76.00 £79.00 £0.00 £79.00
Purchase of Memorial Bench (includes installation - see note 5) - Glen Isla Bench £833.33 £166.67 £1,000.00 £889.17 £177.83 £1,067.00
Purchase of Memorial Tree (including planting - see note 6) Cost Recovery Cost Recovery Cost Recovery Cost Recovery
Search Fee - Per half hour charge £28.00 £0.00 £28.00 £29.00 £0.00 £29.00
Note 1: No charge for young person under 21yrs and for PKC resident under
26yrs who are entitled to after care services.
Note 2: Exhumation is VAT Exempt if for burial at another site, otherwise it is
Standard Rate VAT.
Note 3: Excavation of Foundation for Headstone is Standard Rate VAT, unless
required to carry out interment or burial but where that is required PKC do not
charge separately as that service is included within the overall Interment Fee.
Note 4: Marking Grave for Memorials or location requests is Standard Rate VAT. 
Grave marking required for interment/burials is Exempt for VAT - PKC include
this service within the overall Interment Fee.
Note 5: Purchase of a memorial bench and plaque covers the life of the bench only. 
Specific bench type cannot be guaranteed, dependent on availability of supply.
Note 6: Memorial Tree - Charges will be recharge of costs - quotations supplied
depending on tree variety etc.
Page 153 of 274

Page 154

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
6:   BEREAVEMENT SERVICES - CREMATION CHARGES
CREMATION
Young Person (under 21yrs) £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Adult (21yrs & under) * £836.00 £0.00 £836.00 £870.00 £0.00 £870.00
Direct Cremation (08:45am or 9.00am / No Service) * £553.00 £0.00 £553.00 £553.00 £0.00 £553.00
Scattering of Ashes (Service at Perth) * £27.00 £0.00 £27.00 £28.00 £0.00 £28.00
Scattering of Ashes (Service at External Crematorium) * £65.00 £0.00 £65.00 £68.00 £0.00 £68.00
Scattering of Ashes (Under turf) * £75.00 £0.00 £75.00 £78.00 £0.00 £78.00
Extended Service £185.00 £0.00 £185.00 £317.00 £0.00 £317.00
* No charge for young person under 21yrs and for PKC resident
under 26yrs who are entitled to after care services.
OBITUS MEDIA SERVICES AND PRODUCTS
Tributes
Single Photo - Free of Charge £0.00 £0.00 £0.00
Basic Slideshow - Photo slideshow of up to 25 photos £41.67 £8.33 £50.00
Music Tribute - Tribute of up to 25 photos timed to chosen music £62.50 £12.50 £75.00
Themed Tribute - Up to 25 photos professionally edited and timed from a range of curated themes and music £79.17 £15.83 £95.00
Bespoke Tribute - Professionally crafted bespoke tribute £333.33 £66.67 £400.00
Tributes Extra's
Extra Single Photo - Surcharge for any additional holding images beyond the single photo £10.83 £2.17 £13.00
Tribute Download £8.33 £1.67 £10.00
Extra Tribute Photo's - For each extra 25 photo's on a visual tribute £17.50 £3.50 £21.00
Extra Work Charge - Fee applied to any standard products for additional work (eg adding video to a tribute) £17.50 £3.50 £21.00
Family Supplied Tribute - Family supplied video/photo tribute used as received with basic quality checks £20.83 £4.17 £25.00
Streaming
Live & On Demand - Professionally live streamed service link with option to view online for 28 days £40.83 £8.17 £49.00
Live Only - Available on Request £27.50 £5.50 £33.00
Keepsakes
DVD or USB - DVD or USB copy of service, tribute or both in personalised grey linen case £51.67 £10.33 £62.00
Video Book - Portable video of service, tribute or both set in A5 electronic screen encased in linen-wrapped 'book' £79.17 £15.83 £95.00
Memory Box - Up to 25 photos professionally printed & delivered in linen-wrapped box £108.33 £21.67 £130.00
Keepsakes Extra's
Blu-Ray or Audio CD - Blu-Ray or audio CD copy of live stream/tribute or both wrapped in personalised linen box £45.83 £9.17 £55.00
Second Copies - Any additional copies of DVD or USB keepsakes £23.33 £4.67 £28.00
Page 154 of 274

Page 155

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
Bundles
Obitus Bundle - Single photo + Music Tribute + Livestream + 1 keepsake item £132.50 £26.50 £159.00
Services for Young People (Under 18)
Live & On Demand + Single Photo + Basic Slideshow up to 25 photos - Free of Charge £0.00 £0.00 £0.00
NOTES
1 Obitus media services and product offers may be subject to change.
MEMORIAL OPTIONS
Book of Remembrance (2 line entry) £55.00 £11.00 £66.00 £57.50 £11.50 £69.00
Book of Remembrance (5 line entry) £88.33 £17.67 £106.00 £91.67 £18.33 £110.00
Book of Remembrance (8 line entry) £123.33 £24.67 £148.00 £128.33 £25.67 £154.00
Miniature Books of Remembrance (2 line entry) £98.33 £19.67 £118.00 £102.50 £20.50 £123.00
Miniature Books of Remembrance (5 line entry) £130.83 £26.17 £157.00 £135.83 £27.17 £163.00
Miniature Books of Remembrance (8 line entry) £170.00 £34.00 £204.00 £176.67 £35.33 £212.00
Memorial Cards (2 line entry) £69.17 £13.83 £83.00 £71.67 £14.33 £86.00
Memorial Cards (5 line entry) £111.67 £22.33 £134.00 £115.83 £23.17 £139.00
Memorial Cards (8 line entry) £139.17 £27.83 £167.00 £145.00 £29.00 £174.00
Memorial Cards (Photograph) £69.17 £13.83 £83.00 £71.67 £14.33 £86.00
Memorial Cards (Family Crest) £69.17 £13.83 £83.00 £71.67 £14.33 £86.00
Memorial Cards (Floral Motif) £69.17 £13.83 £83.00 £71.67 £14.33 £86.00
Memorial Cards (Coat of Arms) £69.17 £13.83 £83.00 £71.67 £14.33 £86.00
Caskets £66.67 £13.33 £80.00 £69.17 £13.83 £83.00
LEASE OF MEMORIALS
Granite Tower Plaque - 10 year lease £146.00 £0.00 £146.00 £152.00 £0.00 £152.00
Granite Tower Plaque - 20 year lease £226.00 £0.00 £226.00 £235.00 £0.00 £235.00
Grey Granite Kerb - 10 year lease £312.00 £0.00 £312.00 £325.00 £0.00 £325.00
Grey Granite Kerb - 20 year lease £450.00 £0.00 £450.00 £468.00 £0.00 £468.00
Red Granite Flower Kerb - 10 year lease £312.00 £0.00 £312.00 £325.00 £0.00 £325.00
Red Granite Flower Kerb - 20 year lease £450.00 £0.00 £450.00 £468.00 £0.00 £468.00
Black Granite Flower Kerb - 10 year lease £312.00 £0.00 £312.00 £325.00 £0.00 £325.00
Black Granite Flower Kerb - 20 year lease £450.00 £0.00 £450.00 £468.00 £0.00 £468.00
Granite Mother of Pearl - 10 year lease £482.00 £0.00 £482.00 £501.00 £0.00 £501.00
Granite Mother of Pearl - 20 year lease £723.00 £0.00 £723.00 £756.00 £0.00 £756.00
Upright Granite Memorial - 10 year lease £314.00 £0.00 £314.00 £327.00 £0.00 £327.00
Upright Granite Memorial - 20 year lease £456.00 £0.00 £456.00 £474.00 £0.00 £474.00
Octagonal Wall Plaque - 10 year lease £174.00 £0.00 £174.00 £181.00 £0.00 £181.00
Octagonal Wall Plaque - 20 year lease £295.00 £0.00 £295.00 £307.00 £0.00 £307.00
Granite Columbarium Tower - Single - 10 year lease £291.00 £0.00 £291.00 £303.00 £0.00 £303.00
Granite Columbarium Tower - Double - 10 year lease £576.00 £0.00 £576.00 £600.00 £0.00 £600.00
Granite Columbarium Tower - Single - 20 year lease £417.00 £0.00 £417.00 £434.00 £0.00 £434.00
Granite Columbarium Tower - Double - 20 year lease £828.00 £0.00 £828.00 £861.00 £0.00 £861.00
Children's Granite Bench Plaque - 20 year lease £279.00 £0.00 £279.00 £290.00 £0.00 £290.00
Page 155 of 274

Page 156

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
Red Granite Boulder - 10 year lease £244.00 £0.00 £244.00 £254.00 £0.00 £254.00
Red Granite Boulder - 20 year lease £390.00 £0.00 £390.00 £406.00 £0.00 £406.00
SALE OF MEMORIALS (Sold in perpetuity - children's memorials only)
Granite Children's Mushroom Including Inscription* £190.00 £38.00 £228.00 £197.50 £39.50 £237.00
Children's Butterfly Plaque Including Inscription* £195.00 £39.00 £234.00 £202.50 £40.50 £243.00
Children's Tree of Life Memorial Plaque Including Inscription* £243.33 £48.67 £292.00 £253.33 £50.67 £304.00
Inscription Per Letter £2.17 £0.43 £2.60 £2.25 £0.45 £2.70
Renewal of all leases for further period
Purchase of Memorial Bench (includes installation) - Glen Isla Bench £833.33 £166.67 £1,000.00 £889.17 £177.83 £1,067.00
Purchase of Memorial Tree (including planting - see note 3) Cost Recovery Cost Recovery Cost Recovery Cost Recovery
Note 1: Lease of memorials is VAT Exempt, sale of memorials is Standard Rate VAT.
Note 2: Purchase of a memorial bench and plaque covers the life of the bench only.
Specific bench type cannot be guaranteed, dependent on availability of supply.
Note 3: Memorial Tree - Charges will be recharge of costs - quotations supplied
depending on tree variety etc.
7:   FLEET CHARGES
MOT
Class 4 - Car (Up to 8 passenger seats) £54.85 £0.00 £54.85 £54.85 £0.00 £54.85
Class 5  (13-16 passenger seats) £59.55 £0.00 £59.55 £59.55 £0.00 £59.55
Class 5  (More than 16 passenger seats) £80.65 £0.00 £80.65 £80.65 £0.00 £80.65
Class 7 (Up to 3.5 tonnes) £58.60 £0.00 £58.60 £58.60 £0.00 £58.60
Training
CPC / Various £56.67 £11.33 £68.00 £59.17 £11.83 £71.00
Midas - Standard £80.00 £16.00 £96.00 £83.33 £16.67 £100.00
Midas - Accessible £156.67 £31.33 £188.00 £163.33 £32.67 £196.00
75% of Lease Charge75% of Lease Charge
Page 156 of 274

Page 157

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
8:   SMOKING CHARGES
Fixed Penalty Notice - issued to a person having the management or control of £200.00 £0.00 £200.00 £200.00 £0.00 £200.00
no-smoking premises, you permitted another person to smoke within those premises
(Part 1, Section 1)*
If paid within 14 days from the day after this Notice was issued (Section 1 & 3)* £150.00 £0.00 £150.00 £150.00 £0.00 £150.00
Fixed Penalty Notice - issued if you were smoking within no-smoking premises £50.00 £0.00 £50.00 £50.00 £0.00 £50.00
(Part 1, Section 2)*
If paid within 14 days from the day after this Notice was issued (Section 2)* £30.00 £0.00 £30.00 £30.00 £0.00 £30.00
Fixed Penalty Notice - issued to a person having the management or control of no-smoking £200.00 £0.00 £200.00 £200.00 £0.00 £200.00
premises, you failed to conspicuously display appropriate warning notices in, on or near
to those premises (Part 1 Section 3)*
N.B. Failure to discharge payment within 28 days from the date after the Notice was 
served will result in Perth & Kinross Council reporting the matter to the Procurator
Fiscal or instigating proceedings to recover the amount of the Notice through the
use of Sheriff Officers.
* Smoking, Health & Social Care (Scotland) Act 2005
9:   LITTER CHARGES
Fixed Penalty Notice - issued* £80.00 £0.00 £80.00 £80.00 £0.00 £80.00
Fly-Tipping £200.00 £0.00 £200.00 £500.00 £0.00 £500.00
If a fixed penalty is unpaid after the expiry of the period for paying Perth & Kinross 
Council will report the matter to the Procurator Fiscal.
*Environmental Protection Act 1990
Page 157 of 274

Page 158

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
10:   ROAD NETWORK COMMERCIAL PERMIT CHARGES
Skip Permit (S85) - per week £31.00 £0.00 £31.00 £33.00 £0.00 £33.00
Scaffolding Permit (S58) £52.00 £0.00 £52.00 £55.00 £0.00 £55.00
Road Opening Permit (S56) £152.00 £0.00 £152.00 £160.00 £0.00 £160.00
New Roads & Street Works Act (S109) - per utility, per street, per application £1,500.00 £0.00 £1,500.00 £1,500.00 £0.00 £1,500.00
Road Closure - Posting of Notices (Temporary TRO)
First Notice £810.00 £0.00 £810.00 £875.00 £0.00 £875.00
Emergency Road Closures £500.00 £0.00 £500.00 £500.00 £0.00 £500.00
Extension £400.00 £0.00 £400.00 £400.00 £0.00 £400.00
Temporary Traffic Signals
Switch Off Permanent TL's to allow for Temp TL's £128.00 £0.00 £128.00 £135.00 £0.00 £135.00
Charge per officer hour £170.00 £0.00 £170.00 £170.00 £0.00 £170.00
Rechargeable Works
Installation of 'H' Markings (householder/customer request) £150.00 £30.00 £180.00 £450.00 £90.00 £540.00
Accident Damage Works - Minimum Charge (see note 1) £115.00 £0.00 £115.00 £120.00 £0.00 £120.00
NOTES
1 Installation charge for H Markings also covers future maintenance costs.
2 Accident damage minimum charge is an administration charge which will be applied only where the actual works costs are lower than the minimum charge amount.
Page 158 of 274

Page 159

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
11:   TRADING STANDARDS CHARGES
WEIGHING & MEASURING EQUIPMENT
Charge per officer hour £151.00 £0.00 £151.00 £157.00 £0.00 £157.00
PETROLEUM
Storage capacity
Not exceeding 2,500 litres £46.00 £0.00 £46.00 £46.00 £0.00 £46.00
2,500 to 50,000 litres £62.00 £0.00 £62.00 £62.00 £0.00 £62.00
Exceeding 50,000 litres £131.00 £0.00 £131.00 £131.00 £0.00 £131.00
EXPLOSIVES (2014 REGS)
Explosives store licence - min separation distance > 0 metres (1 year's duration) £189.00 £0.00 £189.00 £189.00 £0.00 £189.00
Explosives store licence - min separation distance > 0 metres (2 year's duration) £248.00 £0.00 £248.00 £248.00 £0.00 £248.00
Explosives store licence - min separation distance > 0 metres (3 year's duration) £311.00 £0.00 £311.00 £311.00 £0.00 £311.00
Explosives store licence - min separation distance > 0 metres (4 year's duration) £382.00 £0.00 £382.00 £382.00 £0.00 £382.00
Explosives store licence - min separation distance > 0 metres (5 year's duration) £432.00 £0.00 £432.00 £432.00 £0.00 £432.00
Renewal of store licence - min separation distance > 0 metres (1 year's duration) £88.00 £0.00 £88.00 £88.00 £0.00 £88.00
Renewal of store licence - min separation distance > 0 metres (2 year's duration) £150.00 £0.00 £150.00 £150.00 £0.00 £150.00
Renewal of store licence - min separation distance > 0 metres (3 year's duration) £211.00 £0.00 £211.00 £211.00 £0.00 £211.00
Renewal of store licence - min separation distance > 0 metres (4 year's duration) £272.00 £0.00 £272.00 £272.00 £0.00 £272.00
Renewal of store licence - min separation distance > 0 metres (5 year's duration) £333.00 £0.00 £333.00 £333.00 £0.00 £333.00
Explosives store licence - no min separation distance or 0 metres (1 year's duration) £111.00 £0.00 £111.00 £111.00 £0.00 £111.00
Explosives store licence - no min separation distance or 0 metres (2 year's duration) £144.00 £0.00 £144.00 £144.00 £0.00 £144.00
Explosives store licence - no min separation distance or 0 metres (3 year's duration) £177.00 £0.00 £177.00 £177.00 £0.00 £177.00
Explosives store licence - no min separation distance or 0 metres (4 year's duration) £211.00 £0.00 £211.00 £211.00 £0.00 £211.00
Explosives store licence - no min separation distance or 0 metres (5 year's duration) £243.00 £0.00 £243.00 £243.00 £0.00 £243.00
Renewal of store licence - no min separation distance or 0 metres (1 year's duration) £55.00 £0.00 £55.00 £55.00 £0.00 £55.00
Renewal of store licence - no min separation distance or 0 metres (2 year's duration) £88.00 £0.00 £88.00 £88.00 £0.00 £88.00
Renewal of store licence - no min separation distance or 0 metres (3 year's duration) £123.00 £0.00 £123.00 £123.00 £0.00 £123.00
Renewal of store licence - no min separation distance or 0 metres (4 year's duration) £155.00 £0.00 £155.00 £155.00 £0.00 £155.00
Renewal of store licence - no min separation distance or 0 metres (5 year's duration) £189.00 £0.00 £189.00 £189.00 £0.00 £189.00
Varying, Transferring or Replacing licence £37.00 £0.00 £37.00 £37.00 £0.00 £37.00
Dangerous wild animals Vets fee + £62.00 admin £0.00 Vets fee + £62.00 admin Vets fee + £68.00 admin £0.00 Vets fee + £68.00 admin
Zoo licence Vets fee + £62.00 admin £0.00 Vets fee + £62.00 admin Vets fee + £68.00 admin £0.00 Vets fee + £68.00 admin
Registration under performing animals regulation (one off payment) £62.00 £0.00 £62.00 £68.00 £0.00 £68.00
Animal boarding licence £200.00 £0.00 £200.00 £220.00 £0.00 £220.00
Animal welfare licence (1-3 years based on risk assessment) £200.00 £0.00 £200.00 £220.00 £0.00 £220.00
50% discount will be given for registered charities
Riding establishments licence Vets fee + £62.00 admin £0.00 Vets fee + £62.00 admin Vets fee + £68.00 admin £0.00 Vets fee + £68.00 admin
Dog Control - Forced Entry Fee (to non-PKC bodies) £50.00 £0.00 £50.00
Better Business Partnership £50.00 £0.00 £50.00 £50.00 £0.00 £50.00
Page 159 of 274

Page 160

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
12:   ENVIRONMENTAL HEALTH CHARGES
£72.00 + £24.00/hour £0.00 £72.00 + £24.00/hour £75.00 + £25.00/hour £0.00 £75.00 + £25.00/hour
Non-regulated Water Sampling Risk Assessment £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Routine Request (Visit and Analysis)* £118.00 £23.60 £141.60 £118.00 £23.60 £141.60
B2 Basic Bacto Request* £118.00 £23.60 £141.60 £118.00 £23.60 £141.60
Single Parameters (available upon request e.g. Aluminium, Copper, Iron etc) £70.00 + Analysis Cost 20% £70.00 + Analysis Cost £70.00 + Analysis Cost 20% £70.00 + Analysis Cost
Resample Charges
* For Non-Statutory Sampling Legislation limits maximum to £118 total charge (excl VAT) per sample visit/analysis
* For Single Parameters Legislation limits the Visit Fee to maximum £70 (excl VAT)
STATUTORY WATER SAMPLING (NO VAT FOR STATUTORY SAMPLES)
Check Monitoring (Visit and Analysis) £173.00 £0.00 £173.00 £180.00 £0.00 £180.00
Check and Audit Monitoring (Visit and Analysis) £439.00 £0.00 £439.00 £457.00 £0.00 £457.00
Single Parameters (available upon request e.g. Aluminium, Copper, Iron etc) Analysis Costs Analysis Costs Analysis Costs Analysis Costs
Resample Charges
Certificate of Compliance - Street Traders £109.00 £0.00 £109.00 £113.00 £0.00 £113.00
Cinema Licence - Per screen £66.00 £0.00 £66.00 £69.00 £0.00 £69.00
Export Health Certificate:-
Product Not of Animal Origin - Food Safety Premises Endorsement for Export Certificate £31.00 £0.00 £31.00 £32.00 £0.00 £32.00
Product Not of Animal Origin - Export Health Certificate £31.00 £0.00 £31.00 £32.00 £0.00 £32.00
Product Not of Animal Origin - Attestation £32.00 £0.00 £32.00
Product of Animal Origin - Attestation £31.00 £0.00 £31.00 £32.00 £0.00 £32.00
Correction / Re-Issue of a Certificate £31.00 £0.00 £31.00 £32.00 £0.00 £32.00
Venison dealers licence £203.00 £0.00 £203.00 £211.00 £0.00 £211.00
Anti-Idling Fixed Penalty Notice £20.00 £0.00 £20.00 £20.00 £0.00 £20.00
Mobile Residential Homes Licences*
1 - 10 Residential Units - First Application £300.00 - £520.00 £0.00 £300.00 - £520.00 £300.00 - £540.00 £0.00 £300.00 - £540.00
1 - 10 Residential Units - Renewal Application £200.00 - £420.00 £0.00 £200.00 - £420.00 £200.00 - £440.00 £0.00 £200.00 - £440.00
11 - 20 Residential Units - First Application £572.00 - £1,040.00 £0.00 £572.00 - £1,040.00 £594.00 - £1,080.00 £0.00 £594.00 - £1,080.00
11 - 20 Residential Units - Renewal Application £462.00 - £840.00 £0.00 £462.00 - £840.00 £484.00 - £880.00 £0.00 £484.00 - £880.00
21 - 30 Residential Units - First Application £1,092.00 - £1,560.00 £0.00 £1,092.00 - £1,560.00 £1,134.00 - £1,620.00 £0.00 £1,134.00 - £1,620.00
21 - 30 Residential Units - Renewal Application £882.00 - £1,260.00 £0.00 £882.00 - £1,260.00 £924.00 - £1,320.00 £0.00 £924.00 - £1,320.00
See Notes 4 & 5 Below
See Note 4 Below
NON-STATUTORY WATER SAMPLING (VAT APPLIES FOR
NON-STATUTORY SAMPLING)
Regulated Water Sampling Risk Assessment preparatory work and visit  
(Visit Charge £72 + Hourly Rate - maximum of 7 hours)
See Notes 4 & 5 Below
See Note 4 Below
Page 160 of 274

Page 161

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
31 - 40 Residential Units - First Application £1,612.00 - £2,080.00 £0.00 £1,612.00 - £2,080.00 £1,674.00 - £2,160.00 £0.00 £1,674.00 - £2,160.00
31 - 40 Residential Units - Renewal Application £1,302.00 - £1,680.00 £0.00 £1,302.00 - £1,680.00 £1,364.00 - £1,760.00 £0.00 £1,364.00 - £1,760.00
41 - 50 Residential Units - First Application £2,132.00 - £2,600.00 £0.00 £2,132.00 - £2,600.00 £2,214.00 - £2,700.00 £0.00 £2,214.00 - £2,700.00
41 - 50 Residential Units - Renewal Application £1,722.00 - £2,100.00 £0.00 £1,722.00 - £2,100.00 £1,804.00 - £2,200.00 £0.00 £1,804.00 - £2,200.00
51 - 60 Residential Units - First Application £2,652.00 - £3,120.00 £0.00 £2,652.00 - £3,120.00 £2,754.00 - £3,240.00 £0.00 £2,754.00 - £3,240.00
51 - 60 Residential Units - Renewal Application £2,142.00 - £2,520.00 £0.00 £2,142.00 - £2,520.00 £2,244.00 - £2,640.00 £0.00 £2,244.00 - £2,640.00
61 - 70 Residential Units - First Application £3,172.00 - £3,640.00 £0.00 £3,172.00 - £3,640.00 £3,294.00 - £3,780.00 £0.00 £3,294.00 - £3,780.00
61 - 70 Residential Units - Renewal Application £2,562.00 - £2,940.00 £0.00 £2,562.00 - £2,940.00 £2,684.00 - £3,080.00 £0.00 £2,684.00 - £3,080.00
71 - 80 Residential Units - First Application £3,692.00 - £4,160.00 £0.00 £3,692.00 - £4,160.00 £3,834.00 - £4,320.00 £0.00 £3,834.00 - £4,320.00
71 - 80 Residential Units - Renewal Application £2,982.00 - £3,360.00 £0.00 £2,982.00 - £3,360.00 £3,124.00 - £3,520.00 £0.00 £3,124.00 - £3,520.00
81 - 90 Residential Units - First Application £4,212.00 - £4,680.00 £0.00 £4,212.00 - £4,680.00 £4,374.00 - £4,860.00 £0.00 £4,374.00 - £4,860.00
81 - 90 Residential Units - Renewal Application £3,402.00 - £3,780.00 £0.00 £3,402.00 - £3,780.00 £3,564.00 - £3,960.00 £0.00 £3,564.00 - £3,960.00
91 - 100 Residential Units - First Application £4,732.00 - £5,200.00 £0.00 £4,732.00 - £5,200.00 £4,914.00 - £5,400.00 £0.00 £4,914.00 - £5,400.00
91 - 100 Residential Units - Renewal Application £3,822.00 - £4,200.00 £0.00 £3,822.00 - £4,200.00 £4,004.00 - £4,400.00 £0.00 £4,004.00 - £4,400.00
Note 1: Mobile Residential Homes Licence - First Applications are £54 per
unit or minimum £300 - Renewal Apps are £44 per unit or minimum £200.
Note 2: Mobile Residential Homes Licence valid for 5 years - then renewal required.
Note 3: No VAT is chargeable where a water sample is taken for statutory reasons.
Note 4: Regulated Water Sampling Risk Assessment - where Risk Assessment
carried out / renewed at same time as sampling only one visit charge will be applied.
Note 5: Water Sample Charges - Resample charges may vary as these will be
dependent on the parameters of the resample requirements.
Note 6: For Non-Statutory Sampling only - discretionary charging but legislation
limits the maximum charge to £118 (excl VAT) per sample visit/analysis.
Note 7: Export Health Certificate replaces pre-Brexit Export Certificate - a formal
national charging structure is pending, until then Local Authorities continue to
use old Export Certificate Charge amounts.
13:   DOG FOULING CHARGES
Fixed Penalty Notice - issued* £80.00 £0.00 £80.00 £80.00 £0.00 £80.00
If a fixed penalty is unpaid after the expiry of the period for paying, Perth & Kinross 
Council will report the matter to the Sheriff Officer.
*Dog Fouling (Scotland) Act 2003
Page 161 of 274

Page 162

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
14:   PARKING CHARGES
PERTH CITY PARKING
Zone 1 - Inner City Centre
On-Street (Per Hour) Max 1 hour £1.60 Max 1 hour £1.70
Off-Street (Per Hour) Max 1 hour £1.40 Max 1 hour £1.50
Zone 2 - City Centre
On-Street (Per Hour) Max 4 hours £1.60 Max 4 hours £1.70
Off-Street (Per Hour) Max 4 hours £1.40 Max 4 hours £1.50
Zone 3 - Outer City Centre
On-Street
1 Hour £1.00 £1.10
2 Hours £1.60 £1.70
3 Hours £2.50 £2.60
4 Hours £3.10 £3.30
6 Hours £4.80 £5.00
Up to 10 Hours £6.40 £6.70
Weekly Ticket (Monday - Saturday) £29.00 £31.00
Monthly Permit (Monday - Friday) £54.00 £57.00
Monthly Permit (Monday - Saturday) £81.00 £85.00
Thimblerow Car Park
1 Hour £1.40 £1.50
2 Hours £2.90 £3.00
3 Hours £4.40 £4.60
4 Hours £5.80 £6.00
6 Hours £8.80 £9.20
Up To 10 Hours £11.80 £12.30
Weekly Ticket (Monday - Saturday) £65.00 £68.00
Monthly Permit (Monday - Friday) £87.00 £91.00
Monthly Permit (Monday - Saturday) £139.00 £145.00
Page 162 of 274

Page 163

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
Canal Street MSCP
1 Hour £1.40 £1.50
2 Hours £2.90 £3.00
3 Hours £4.40 £4.60
4 Hours £5.80 £6.00
6 Hours £8.80 £9.20
Up To 10 Hours £11.80 £12.30
Weekly Ticket (Monday - Saturday) £65.00 £68.00
Monthly Permit (Monday - Friday) £87.00 £91.00
Monthly Permit (Monday - Saturday) £139.00 £145.00
South Inch Car Park
1 Hour £0.90 £1.00
2 Hours £1.40 £1.50
3 Hours £2.30 £2.40
4 Hours £2.90 £3.00
6 Hours £4.40 £4.60
Up To 10 Hours £5.80 £6.00
Weekly Ticket (Monday - Saturday) £29.00 £31.00
Monthly Permit (Monday - Friday) £54.00 £57.00
Monthly Permit (Monday - Saturday) £81.00 £85.00
Norrie Miller/Riverside Car Park
1 Hour £0.90 £1.00
2 Hours £1.40 £1.50
3 Hours £2.30 £2.40
4 Hours £2.90 £3.00
6 Hours £4.40 £4.60
Up To 10 Hours £5.80 £6.00
Weekly Ticket (Monday - Saturday) £29.00 £31.00
Monthly Permit (Monday - Friday) £54.00 £57.00
Monthly Permit (Monday - Saturday) £81.00 £85.00
Victoria Street Car Park
1 Hour £0.90 £1.00
2 Hours £1.40 £1.50
3 Hours £2.30 £2.40
4 Hours £2.90 £3.00
6 Hours £4.40 £4.60
Up To 10 Hours £5.80 £6.00
Weekly Ticket (Monday - Saturday) £29.00 £31.00
Monthly Permit (Monday - Friday) £54.00 £57.00
Monthly Permit (Monday - Saturday) £81.00 £85.00
Page 163 of 274

Page 164

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
Riverside Turning Head Car Park
1 Hour £0.90 £1.00
2 Hours £1.40 £1.50
3 Hours £2.30 £2.40
4 Hours £2.90 £3.00
6 Hours £4.40 £4.60
Up To 10 Hours £5.80 £6.00
Weekly Ticket (Monday - Saturday) £29.00 £31.00
Monthly Permit (Monday - Friday) £54.00 £57.00
Monthly Permit (Monday - Saturday) £81.00 £85.00
Residents Permits - Perth City Only
Inner Zone - Annual (On & within Inner Ring Road) £254.00 £264.00
Outer Zone - Annual £145.00 £151.00
CRIEFF TOWN CENTRE PARKING
On-Street (30 Mins) £1.00 £1.10
On-Street (Per Hour) Max 1 hour £1.60 Max 1 hour £1.70
Off-Street (Per Hour) - James Square Max 1 hour £1.40 Max 1 hour £1.50
Residents Permits (Annual) £159.00 £166.00
BLAIRGOWRIE TOWN CENTRE PARKING
Off-Street
Croft Lane, The Croft/Ericht Lane
1 Hour £1.20 £1.30
2 Hours £2.20 £2.30
Leslie Street
1 Hour £1.20 £1.30
2 Hours £2.20 £2.30
4 Hours £3.60 £3.80
10 Hours £5.30 £5.50
Season Ticket (Annual) £175.00 £182.00
PITLOCHRY TOWN CENTRE PARKING
Off-Street
Atholl Road, Ferry Road & Rie-Achan Road
1 Hour £1.20 £1.30
2 Hours £2.20 £2.30
4 Hours £3.60 £3.80
10 Hours £5.30 £5.50
Rie-Achan Road - Coaches per visit £5.30 £5.50
Season Ticket (Annual) £175.00 £182.00
Page 164 of 274

Page 165

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
DUNKELD TOWN CENTRE PARKING
Off-Street
Atholl Street & Tay Terrace
1 Hour £1.20 £1.30
- 2 Hours2 Hours £2.20 £2.30
- 4 Hours4 Hours £3.60 £3.80
- 10 Hours10 Hours £5.30 £5.50
Season Ticket (Annual) £175.00 £182.00
PENALTY CHARGE NOTICES (PCN)
Charge at point of issue - If paid 15 days from PCN issue up to Notice to Owner being issued £100.00 £100.00
If paid within 14 days of PCN issue (50% discount) £50.00 £50.00
If not paid after 8 weeks of issue - If paid after Charge Certificate issued (increase by 50%) £150.00 £150.00
Blue Badge Scheme - Badge Fee £20.00 £20.00
Vehicle Uplift £150.00 £150.00
Vehicle Storage (following uplift) - Per Day £20.00 £20.00
BAY SUSPENSIONS
On Street - Per Bay Per Day £17.40 £18.00
Off Street - Per Bay Per Day £17.40 £18.00
LIVE ACTIVE LEISURE CAR PARKS
Off-Street
Rodney Pavilion
2 Hours £0.90 £1.00
3 Hours £3.60 £3.80
4 Hours £5.30 £5.50
Bells Sports Centre
2 Hours £0.90 £1.00
5 Hours £1.00 £1.10
6 Hours £5.50 £5.70
9 Hours £7.00 £7.30
CHARGING FOR ALTERNATIVE USE OF CAR PARKING SPACES
1. Council events run by Perth & Kinross Council
2. Events funded / supported by Perth & Kinross Council - charge discounted initially as
agreed by Sponsor (Head of Service / Executive Director). As the event becomes more
established then charges will be introduced as determined by the Sponsor.
3. Commercial Events - Normal charge with 50% discount applied for long term
suspensions (>14 days)
4. Charitable Events
Discount by Arrangement
No Charge
No Charge
By Arrangement
No Charge
By Arrangement
Discount by Arrangement
No Charge
Page 165 of 274

Page 166

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
PARKING DISPENSATION
Per Vehicle Per Day (with prior approval from PKC Parking Services) £25.00 £25.00
CHARGES FOR CONES & NOTICES
Deployment & Collection of Cones/Notices
First Hour (1 vehicle and 1 operative - max 90 cones) £300.00 £312.00
Additional Hours (per hour, per operative) £144.00 £150.00
Replacement of Lost/Damaged Equipment
Per Cone £24.00 £25.00
Per Notice Board £240.00 £250.00
Notes:
1.   All 3 Perth City Zones (including Rodney Pavilion & Bells Sports Centre) & Rural Towns allow first 15 minutes of free parking.
2.   All On & Off Street Charges Apply 8am To 6pm Monday To Saturday.
3.   On-Street Parking charges exclude VAT (outwith scope).
4.   Off-Street Parking charges include VAT (standard rate 20%).
5. Bay Suspensions - discounted rates may be applied for extended periods for large events etc. See charging for Alternative Use of Car Parking Spaces above.
6.   Parking Dispensations - the Council must be satisfied that parking in contravention is necessary before approval will be granted.
RESIDENTIAL DEVELOPMENT
Fee per dwelling £600.00 £0.00 £600.00 £600.00 £0.00 £600.00
Fee per dwelling for first 10 dwellings £600.00 £0.00 £600.00 £600.00 £0.00 £600.00
Fee for each dwelling thereafter £450.00 £0.00 £450.00 £450.00 £0.00 £450.00
Fee for first 10 dwellings £6,000.00 £0.00 £6,000.00 £6,000.00 £0.00 £6,000.00
Fee per dwelling for dwellings 11-49 £450.00 £0.00 £450.00 £450.00 £0.00 £450.00
Fee per dwelling for 50th dwelling and above £250.00 £0.00 £250.00 £250.00 £0.00 £250.00
(Subject to a maximum of £150,000)
TABLE 1
Fees for applications for planning permission and for applications for matters
specified by condition on a planning permission in principle
1) Construction of buildings, structures or erections for use as residential accommodation
(other than development within categories 2-6):-
a) Where development does not exceed 10 dwellings:
b) Where development is fewer than 50 dwellings:
c) Where development is 50 of more dwellings:
(Subject to a maximum of £150,000)
15:   PLANNING & BUILDING STANDARDS CHARGES
NB. This is not a comprehensive list of fees.  If in doubt please contact
Planning and Development
Page 166 of 274

Page 167

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
EXISTING DWELLINGS
£300.00 £0.00 £300.00 £300.00 £0.00 £300.00
£600.00 £0.00 £600.00 £600.00 £0.00 £600.00
£300.00 £0.00 £300.00 £300.00 £0.00 £300.00
£600.00 £0.00 £600.00 £600.00 £0.00 £600.00
£300.00 £0.00 £300.00 £300.00 £0.00 £300.00
£600.00 £0.00 £600.00 £600.00 £0.00 £600.00
NON-RESIDENTIAL BUILDINGS
£300.00 £0.00 £300.00 £300.00 £0.00 £300.00
£600.00 £0.00 £600.00 £600.00 £0.00 £600.00
£600.00 + £600.00 per
additional 100 sqm £0.00
£600.00 + £600.00 per
additional 100 sqm
£600.00 + £600.00 per
additional 100 sqm £0.00
£600.00 + £600.00 per
additional 100 sqm
£24,000 + £300.00
per additional 100 sqm £0.00
£24,000 + £300.00
per additional 100 sqm
£24,000 + £300.00
per additional 100 sqm £0.00
£24,000 + £300.00
per additional 100 sqm
£600.00 per 0.1 hectare £0.00 £600.00 per 0.1 hectare £600.00 per 0.1 hectare £0.00 £600.00 per 0.1 hectare
AGRICULTURAL BUILDINGS
£500.00 £0.00 £500.00 £500.00 £0.00 £500.00
£500.00 + £500.00 per
additional 100 sqm £0.00
£500.00 + £500.00 per
additional 100 sqm
£500.00 + £500.00 per
additional 100 sqm £0.00
£500.00 + £500.00 per
additional 100 sqm
GLASSHOUSES & POLYTUNNELS
£100.00 per 100 sqm £0.00 £100.00 per 100 sqm £100.00 per 100 sqm £0.00 £100.00 per 100 sqm
(Subject to a maximum of £25,000)
(Subject to a maximum of £5,000)
a) Where application relates to 1 dwelling
b) Where application relates to 2 or more dwellings
3b) Erection or construction of gates, fences, walls or other means of enclosure along a
boundary of the curtilage of an existing dwelling:-
6) The erection of glasshouses or polytunnels to be used for agricultural purposes:-
Fee for each 100 square metres of ground area to be covered by the development
3a) Carrying out of operations including erection of a building within the curtilage of an
existing dwelling, for purposes ancillary to the enjoyment of the dwelling as such:-
a) Where application relates to 1 dwelling
b) Where application relates to 2 or more dwellings
4) Construction of buildings, structures or erections including extensions (other than
construction within categories 1, 5 and 6):-
a) Where no floor area is created, or the gross floor space does not exceed 50sq metres
a) Where the ground area to be covered by the development does not exceed 500sq metres
(Subject to a maximum of £25,000)
b) Where the gross floor space created exceeds 50sq metres, but does not
exceed 100sq metres
c) Where the gross floor space created exceeds 100sq metres, but does not exceed 4,000sq
metres
d) Where the gross floor space created exceeds 4,000sq metres
e) Where no buildings or floor space is to be created - fee per 0.1 hectare of site area
5) The erection, on land used for purposes of agriculture, of buildings to be used for
agriculture purposes (other than construction within category 6):-
a) Where application relates to 1 dwelling
b) Where application relates to 2 or more dwellings
b) Where the ground area to be covered by the development exceeds 500sq metres
2) Carrying out of operations which will result in enlargement, improvement or other alteration
of an existing dwelling:-
(Subject to a maximum of £5,000)
Page 167 of 274

Page 168

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
ENERGY GENERATION - WIND TURBINES
i) Where none of the turbines have a ground to hub height exceeding 15 metres £1,250.00 £0.00 £1,250.00 £1,250.00 £0.00 £1,250.00
ii) Where one or more of the turbines has a ground to hub height exceeding 15 metres,
but not exceeding 50 metres £2,500.00 £0.00 £2,500.00 £2,500.00 £0.00 £2,500.00
iii) Where one or more of the turbines has a ground to hub height exceeding 50 metres £5,000.00 £0.00 £5,000.00 £5,000.00 £0.00 £5,000.00
£500.00 per 0.1 hectare £0.00 £500.00 per 0.1 hectare £500.00 per 0.1 hectare £0.00 £500.00 per 0.1 hectare
(Section awaiting clarification from Scottish Gov't relating to planning permission in principle)
ENERGY GENERATION - HYDRO ELECTRIC
£500.00 per 0.1 hectare £0.00 £500.00 per 0.1 hectare £500.00 per 0.1 hectare £0.00 £500.00 per 0.1 hectare
ENERGY GENERATION - SOLAR ELECTRIC
£500.00 per 0.1 hectare £0.00 £500.00 per 0.1 hectare £500.00 per 0.1 hectare £0.00 £500.00 per 0.1 hectare
DRILLING FOR OIL / NATURAL GAS
£1,000.00 £0.00 £1,000.00 £1,000.00 £0.00 £1,000.00
£1,000 + £500.00 per
additional 0.1 hectare £0.00
£1,000 + £500.00 per
additional 0.1 hectare
£1,000 + £500.00 per
additional 0.1 hectare £0.00
£1,000 + £500.00 per
additional 0.1 hectare
FISH AND SHELLFISH FARMING
£200.00 £0.00 £200.00 £200.00 £0.00 £200.00
£75.00 £0.00 £75.00 £75.00 £0.00 £75.00
£200.00 £0.00 £200.00 £200.00 £0.00 £200.00
(Subject to a maximum of £25,000)
(Subject to a maximum of £25,000)
(Subject to a maximum of £150,000)
(Subject to a maximum of £25,000)
(Subject to a maximum of £25,000)
(Subject to a maximum of £150,000)
11) The placing or assembly of equipment in any part of marine waters for the purposes of
fish farming:-
12) The placing or assembly of equipment in any part of marine waters for the purposes of
shellfish farming:-
For each 0.1 hectare of surface area of the marine waters to be used
7) The erection of wind turbines and the carrying out of other operations in connection with
the construction of the generating station, including the construction or installation of any
means of access to the generating station, pipes or other conduits, and overhead lines:-
a) Where the number of turbines does not exceed 3:
b) Where the number of turbines exceeds 3 - for each 0.1 hectare of site area
8) The construction of a hydro-electric generating station and the carrying out of any other
operations in connection with the construction of the generating station, including the
construction or installation of any means of access to the generating station, pipes or other
conduits, and overhead lines:-
(Subject to a maximum of £25,000)
(Subject to a maximum of £25,000)
(Subject to a maximum of £25,000)
(Subject to a maximum of £150,000)
(Subject to a maximum of £150,000)
For each 0.1 hectare of surface area of the marine waters to be used, plus
For each 0.1 hectare of the sea bed to be used
(Subject to a maximum of £25,000)
9) The construction of a solar-electric generating station and the carrying out of any other
operations in connection with the construction of the generating station, including the
construction or installation of any means of access to the generating station, pipes or other
conduits, and overhead lines:-
Fee for each 0.1 hectare of site area
10) The carrying out of any operations connected with the exploratory drilling for oil or
natural gas:-
a) Where the site area does not exceed 0.1 hectares
b) Where the site area exceeds 0.1 hectares
Fee for each 0.1 hectare of site area
Page 168 of 274

Page 169

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
OTHER OPERATIONS
*This would include plant or machinery for energy storage and heat network developments
£500.00 per 0.1 hectare £0.00 £500.00 per 0.1 hectare £500.00 per 0.1 hectare £0.00 £500.00 per 0.1 hectare
£25,000 + £250.00 per
additional 0.1 hectare £0.00
£25,000 + £250.00 per
additional 0.1 hectare
£25,000 + £250.00 per
additional 0.1 hectare £0.00
£25,000 + £250.00 per
additional 0.1 hectare
£500.00 £0.00 £500.00 £500.00 £0.00 £500.00
£1,000.00 £0.00 £1,000.00 £1,000.00 £0.00 £1,000.00
£1,000 + £500.00 per
additional 0.1 hectare £0.00
£1,000 + £500.00 per
additional 0.1 hectare
£1,000 + £500.00 per
additional 0.1 hectare £0.00
£1,000 + £500.00 per
additional 0.1 hectare
£75,000 + £250.00 per
additional 0.1 hectare £0.00
£75,000 + £250.00 per
additional 0.1 hectare
£75,000 + £250.00 per
additional 0.1 hectare £0.00
£75,000 + £250.00 per
additional 0.1 hectare
£500.00 £0.00 £500.00 £500.00 £0.00 £500.00
£1,000.00 £0.00 £1,000.00 £1,000.00 £0.00 £1,000.00
£1,000 + £500.00 per
additional 1 hectare £0.00
£1,000 + £500.00 per
additional 1 hectare
£1,000 + £500.00 per
additional 1 hectare £0.00
£1,000 + £500.00 per
additional 1 hectare
£8,500 + £250.00 per
additional 0.1 hectare £0.00
£8,500 + £250.00 per
additional 0.1 hectare
£8,500 + £250.00 per
additional 0.1 hectare £0.00
£8,500 + £250.00 per
additional 0.1 hectare
USE OF LAND
£1,000.00 £0.00 £1,000.00 £1,000.00 £0.00 £1,000.00
£1,000 + £500.00 per
additional 1 hectare £0.00
£1,000 + £500.00 per
additional 1 hectare
£1,000 + £500.00 per
additional 1 hectare £0.00
£1,000 + £500.00 per
additional 1 hectare
£8,500 + £250.00 per
additional 0.1 hectare £0.00
£8,500 + £250.00 per
additional 0.1 hectare
£8,500 + £250.00 per
additional 0.1 hectare £0.00
£8,500 + £250.00 per
additional 0.1 hectare
£1,000.00 £0.00 £1,000.00 £1,000.00 £0.00 £1,000.00
£1,000 + £500.00 per
additional 1 hectare £0.00
£1,000 + £500.00 per
additional 1 hectare
£1,000 + £500.00 per
additional 1 hectare £0.00
£1,000 + £500.00 per
additional 1 hectare
£25,500 + £250.00 per
additional 0.1 hectare £0.00
£25,500 + £250.00 per
additional 0.1 hectare
£25,500 + £250.00 per
additional 0.1 hectare £0.00
£25,500 + £250.00 per
additional 0.1 hectare
(Section awaiting clarification from Scottish Gov't)
(Subject to a maximum of £150,000)
(Subject to a maximum of £150,000)
(Subject to a maximum of £6,000)
(Subject to a maximum of £150,000)
(Subject to a maximum of £150,000)
(Subject to a maximum of £150,000)
b) Where the site area exceeds 0.1 hectare but does not exceed 15 hectares
c) Where the site area exceeds 15 hectares
15) Operations for the winning and working of minerals (not including peat):-
a) Where the site area does not exceed 5 hectares
(Subject to a maximum of £150,000)
14) The construction of car parks, service roads and other means of access on land used
for the purposes of a single undertaking, where the development is required for a purpose
incidental to the existing use of the land:-
(Subject to a maximum of £150,000)
16) Operations for the extraction of peat:-
For each 0.1 hectare of site area
17) The carrying out of any operations not coming within any of the above categories:-
c) Where the site area exceeds 15 hectares
(Subject to a maximum of £150,000)
a) Where the site area does not exceed 0.1 hectare
a) Where the site area does not exceed 0.1 hectare
b) Where the site area exceeds 0.1 hectare but does not exceed 15 hectares
c) Where the site area exceeds 15 hectares
b) Where the site area exceeds 5 hectares
a) Where the site area does not exceed 0.1 hectare
b) Where the site area exceeds 0.1 hectare but does not exceed 15 hectares
c) Where the site area exceeds 15 hectares
(Subject to a maximum of £6,000)
(Subject to a maximum of £150,000)
19) The use of land for the storage of minerals in the open:-
13) The erection, alteration or replacement of plant or machinery:-
a) Where the site area does not exceed 0.1 hectare
b) Where the site area exceeds 0.1 hectare but does not exceed 15 hectares
(Subject to a maximum of £150,000)
18) The use of land for the disposal of refuse or waste materials or for the deposit of
material remaining after minerals have been extracted from land:-
Page 169 of 274

Page 170

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
CHANGE OF USE OF BUILDINGS OR LAND
Fee per dwelling £600.00 £0.00 £600.00 £600.00 £0.00 £600.00
Fee for first 10 dwellings £6,000.00 £0.00 £6,000.00 £6,000.00 £0.00 £6,000.00
Fee for each dwelling thereafter £450.00 £0.00 £450.00 £450.00 £0.00 £450.00
Fee for first 49 dwellings £23,550.00 £0.00 £23,550.00 £23,550.00 £0.00 £23,550.00
Fee for each dwelling thereafter £250.00 £0.00 £250.00 £250.00 £0.00 £250.00
£600.00 £0.00 £600.00 £600.00 £0.00 £600.00
£600.00 + £600.00 per
additional 100 sqm £0.00
£600.00 + £600.00 per
additional 100 sqm
£600.00 + £600.00 per
additional 100 sqm £0.00
£600.00 + £600.00 per
additional 100 sqm
£24,000 + £300.00
per additional 100 sqm £0.00
£24,000 + £300.00
per additional 100 sqm
£24,000 + £300.00
per additional 100 sqm £0.00
£24,000 + £300.00
per additional 100 sqm
£500.00 per 0.1 hectare £0.00 £500.00 per 0.1 hectare £500.00 per 0.1 hectare £0.00 £500.00 per 0.1 hectare
RESIDENTIAL DEVELOPMENT - NEW DWELLINGS
a) Where only 1 dwellinghouse is to be created £600.00 £0.00 £600.00 £600.00 £0.00 £600.00
£600.00 per 0.1 hectare £0.00 £600.00 per 0.1 hectare £600.00 per 0.1 hectare £0.00 £600.00 per 0.1 hectare
c) Where more than 1 dwellinghouse is to be created and site area exceeds 2.5 hectares £15,000 + £300.00 per
additional 0.1 hectare £0.00
£15,000 + £300.00 per
additional 0.1 hectare
£15,000 + £300.00 per
additional 0.1 hectare £0.00
£15,000 + £300.00 per
additional 0.1 hectare
NON-RESIDENTIAL BUILDINGS
£600.00 per 0.1 hectare £0.00 £600.00 per 0.1 hectare £600.00 per 0.1 hectare £0.00 £600.00 per 0.1 hectare
c) Where the site area exceeds 2.5 hectares £15,000 + £300.00 per
additional 0.1 hectare £0.00
£15,000 + £300.00 per
additional 0.1 hectare
£15,000 + £300.00 per
additional 0.1 hectare £0.00
£15,000 + £300.00 per
additional 0.1 hectare
(Subject to a maximum of £5,000)
(Subject to a maximum of £75,000)
(Subject to a maximum of £75,000)
(Subject to a maximum of £150,000)
Fees for applications for planning permission in principle.
b) A change of use within categories 18 or 19, or
c) A change in the use of equipment place or assembled in marine waters for the purposes
of fish farming or shellfish farming
(Subject to a maximum of £5,000)
TABLE 2
c) Where the gross floor space exceeds 4,000sq metres
(Subject to a maximum of £150,000)
22) A material change in the use of land - fee per 0.1 hectare of site area (other than those
detailed below):-
a) A change of use within category 21, or
b) Where the number of dwellings to be created is fewer than 50 dwellings:
c) Where the number of dwellings to be created is 50 or more:
21) A material change in the use of a building (other than a change of use referred to in
category 20):-
a) Where the gross floor space does not exceed 100sq metres
b) Where the gross floor space exceeds 100sq meters, but does not exceed 4,000sq metres
20) The change of use of a building to use as one or more dwellings:-
a) Where the number of dwellings to be created does not exceed 10 dwellings:
1) Construction of buildings, structures or erections for use as residential accommodation:-
b) Where more than 1 dwellinghouse is to be created and site area does not exceed
2.5 hectares
(Subject to a maximum of £75,000)
b) Where the site is less than or equal to 2.5 hectares
(Subject to a maximum of £75,000)
2) Construction of buildings, structures or erections including extensions:-
Page 170 of 274

Page 171

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
CERTIFICATES OF LAWFULNESS OF EXISTING USE OR DEVELOPMENT
1) An application under section 150(1) (a) or (b) of the 1997 Act (or both as the case may be):-
The amount that would be payable in respect of an application for planning permission to
institute the use or carry out the operations specified in the application (or an application
to do both, as the case may be).
2) An application under section 150(1) (c) of the 1997 Act £300.00 £0.00 £300.00 £300.00 £0.00 £300.00
CERTIFICATES OF LAWFULNESS FOR PROPOSED USE OR DEVELOPMENT
3) An application under section 151(1) of the 1997 Act (apart from one within category 4):-
Half the amount that would be payable in respect of an application for planning
permission to institute the use or carry out the operations specified in the application
(or an application to do both, as the case may be).
£600.00 per
dwellinghouse £0.00
£600.00 per
dwellinghouse
£600.00 per
dwellinghouse £0.00
£600.00 per
dwellinghouse
£100.00 £0.00 £100.00 £100.00 £0.00 £100.00
£500.00 £0.00 £500.00 £500.00 £0.00 £500.00
£500.00 £0.00 £500.00 £500.00 £0.00 £500.00
£500.00 £0.00 £500.00 £500.00 £0.00 £500.00
£500.00 £0.00 £500.00 £500.00 £0.00 £500.00
£500.00 £0.00 £500.00 £500.00 £0.00 £500.00
£500.00 £0.00 £500.00 £500.00 £0.00 £500.00
Refer to Table 1 for Fee
Refer to Table 1 for Fee - Half the Applicable Fee
(Subject to a maximum of £150,000)
No Fee
No Fee
TABLE 3
Fees for applications for a certificate of lawful use or development (Section 150) or
a certificate of proposed use or development (Section 151 of the 1997 Act).
Refer to Table 1 for Fee
Refer to Table 1 for Fee - Half the Applicable Fee
4) An application under section 151(1) (a) where the use specified is use as one or more
separate dwellinghouses
(Subject to a maximum of £150,000)
8) An application made by virtue of paragraph (4) of Class 22 of Part 7 (forestry
buildings and operations)
9) An application made by virtue of sub-paragraph (23) of Class 67 of Part 20 (development
by electric communications code operators)
No Fee
No Fee
TABLE 4
Fees for a determination as to whether prior approval is required for development
under schedule 1 of the general permitted development order 1992, as amended.
1) An application made for determination as to whether the prior approval of the planning
authority is required in relation to development (other than one within categories 2 to 9)
2) An application made by virtue of paragraph (4A) of Class 18 of Part 6 (agricultural
buildings and operations)
3) An application made by virtue of paragraph (4) of Class 18 of Part 6 (agricultural
buildings and operations)
4) An application made by virtue of paragraph (5) of Class 18C of Part 6 (agricultural
buildings and operations)
5) An application made by virtue of paragraph (4) of Class 21A of Part 6A (fish farming)
6) An application made by virtue of paragraph (4) of Class 22A of Part 7 (forestry
buildings and operations)
7) An application made by virtue of paragraph (5) of Class 22B of Part 7 (forestry
buildings and operations)
Page 171 of 274

Page 172

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
NON MATERIAL VARIATION
DISCHARGE OF CONDITIONS
COMPLIANCE WITH CONDITIONS
PRE-APPLICATION ENQUIRIES
A separate enquiry, and fee, is required for each development or each site.
Note - Pre-application enquires must be submitted via MyPKC on-line enquiry form.
Householder Enquiry £41.67 £8.33 £50.00 £43.33 £8.67 £52.00
Local Enquiries £208.33 £41.67 £250.00 £250.00 £50.00 £300.00
Major Enquiries £416.67 £83.33 £500.00 £833.33 £166.67 £1,000.00
Returned Applications - Administration Charge - see note 7 below £20.83 £4.17 £25.00
Fee reduced by half
Fee waived in full
Fee reduced by half
£100.00 for each request - no limit on number of requests
Fee waived in full
Fee reduced by half
£100.00 for each request - no limit on number of requests
Fee waived in full
Fee reduced by half
Fee waived in full
£200.00 for each request - no limit on number of requests
TABLE 5
Charges for discretionary services (regulation 4)
A request made to a planning authority to vary a planning permission under section 64 of
the Town and Country Planning (Scotland) Act 1997 (as amended)
Householder enquiries which would benefit from planning application fee exemption under
Reg 7 (means of access, etc for disabled persons)
Where an enquiry relates to a development which would benefit from planning application
fee reduction under Schedule 1, art 7 (community councils)
£200.00 for each request - no limit on number of requests
Fee waived in full
Fee reduced by half
Where an applicant seeks approval of information submitted in respect of a condition
attached to a planning permission, for the agreement of the planning authority £100.00 for each request - no limit on number of requests
Householder enquiries which would benefit from planning application fee exemption under
Reg 7 (means of access, etc for disabled persons) Fee waived in full
Where an enquiry relates to a development which would benefit from planning application
fee reduction under Schedule 1, art 7, (community councils) Fee reduced by half
Where an applicant seeks confirmation that the terms set out in a condition attached
to a planning permission have been met:- £100.00 for each request - no limit on number of requests
Householder enquiries which would benefit from planning application fee exemption under
Reg 7 (means of access, etc for disabled persons):- Fee waived in full
Where an enquiry relates to a development which would benefit from planning application
fee reduction under Schedule 1, art 7, (community councils):- Fee reduced by half
Where an enquiry relates to a householder development which would benefit from planning
application fee exemption under Reg 7 (means of access, etc for disabled persons) Fee waived in full
Where an enquiry relates to a development which would benefit from planning application
fee reduction under Schedule 1, art 7, (community councils) Fee reduced by half
Page 172 of 274

Page 173

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
PRE-VALIDATION SUBMISSION CHECKS
Where an application is checked before formal submission to identify any omissions.
Note - The scale of the development is as defined in the Hierarchy Regulations.
Householder Planning Applications £20.83 £4.17 £25.00 £20.83 £4.17 £25.00
Local Planning Applications £50.00 £10.00 £60.00 £50.00 £10.00 £60.00
Major Planning Applications £100.00 £20.00 £120.00 £100.00 £20.00 £120.00
Note - there is no charge is respect of submissions relating to listed building consent
or conservation area consent.
Note - "not for profit enterprise" and "social enterprise" have meanings in section
252(1F) of the Town and Country Planning (Scotland) Act 1997 (as amended)
APPLICATIONS MADE IN RETROSPECT
APPLICATIONS BY COMMUNITY COUNCILS
Applications by Community Councils
Fee waived in full
Fee reduced by half
Fee reduced by one quarter for planning applications, certificates
of lawful use or development, certificates of proposed use or development,
advertisement consents, applications made under section 41 and
determinations as to whether the planning authority's prior approval
is required.
Reduced and waived fees subject to agreement by Council
Fee calculated in accordance with tables above, plus one quarter
Fee calculated in accordance with tables above, plus one quarter
Fee calculated in accordance with tables above, reduced by 50%
Where an enquiry relates to a householder development which would benefit from planning
application fee exemption under Reg 7 (means of access, etc for disabled persons) Fee waived in full
Where an enquiry relates to a development which would benefit from planning application
fee reduction under Schedule 1, art 7, (community councils) Fee reduced by half
TABLE 6
Waived or reduced fees for planning applications (regulations 5)
Where the application relates to development which, in the opinion of the planning authority,
has the primary purpose of contributing to a not-for-profit enterprise or a social enterprise,
and where the application relates to development which, in the opinion of the planning
authority, is likely to contribute to improving health of residents of the area to which the
application relates.
Fee reduced by one quarter for planning applications, certificates
of lawful use or development, certificates of proposed use or development,
advertisement consents, applications made under section 41 and
determinations as to whether the planning authority's prior approval
is required.
Reduced and waived fees subject to agreement by Council
TABLE 7
Surcharges (applicable from 1 October 2022)
Where an application for planning permission is made after the whole development
being applied for has been carried out in full Fee calculated in accordance with tables above, plus one quarter
Fee calculated in accordance with tables above, plus one quarter
Where an application for planning permission is made when the development
being applied for has been started but not completed, including revised design
of a previously granted planning permission:-
TABLE 8
Modified Fees
Fee calculated in accordance with tables above, reduced by 50%
Page 173 of 274

Page 174

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
APPLICATION IN CONSERVATION AREAS
a) Where the application relates solely to:-
i) The carrying out of operations for the alteration of a dwellinghouse (but not including
the extension of or the erection of a dwellinghouse); or
ii) The operations within the curtilage of a dwellinghouse (but not including the
extension of or the erection of a dwellinghouse)
b) The dwellinghouse is in a conservation area
APPLICATIONS FOR THE PROVISION OF FACILITIES FOR SPORT OR RECREATION
a) The application relates to:-
i) The making of material change in the use of land to use the land as a playing field; or
ii) The carrying out of operations other than the erection of a building containing floor
space, for purposes ancillary to the use of the land as a playing field, and to no other
development; and
Where:-
a) An application is made for approval, consent or agreement in respect of one or more
matters requiring such approval, consent or agreement in terms of a condition imposed
on a grant of planning permission in principle ("the current application"), and
b) The applicant has previously made one or more applications for approval, consent
or agreement required by a condition imposed on the grant of that same planning
permission in principle and paid the fee in relation to such application or applications.
£600.00 £0.00 £600.00
Where the amount paid as mentioned in paragraph (b) is not less than
the amount which would be payable if the applicant were by the current
application seeking approval, consent or agreement in respect of all
matters requiring such approval, consent or agreement in terms of
conditions imposed on a grant of a planning permission in principle
and in relation to the whole of the development authorised by the
permission, the fee payable in respect of the current application is £500
Where:-
a) A fee has been paid as mentioned in sub-paragraph (b) as a rate
lower than that prevailing at the date of the current application, and
b) Sub-paragraph (2) would apply if that fee had been paid at the rate
applying at that date.
The fee of in respect of the current application is £500
Fee calculated in accordance with tables above, reduced by 25%
c) The application relates solely to a development within one or more of the classes
specified in schedule 1 of the General Permitted Development Order; and
c) The only reason planning permission is not granted by article 3(1) of the General
Permitted Development Order is that the development would be in a conservation area.
Fee calculated in accordance with tables above, reduced by 25%
Where an application is made by or for a club, society, trust or other organisation which
is not established or conducted for profit and whose objects or purposes, as the case may
be, are the provision of facilities for sport or recreation, and:
b) That the planning authority is satisfied that the development is to be carried out on land
which is, or is intended to be used wholly or mainly for the carrying out of objects or
purposes, as the case may be, of the club, society, trust or organisation.
£600.00 £0.00 £600.00
APPLICATIONS FOR THE APPROVAL, CONSENT OR AGREEMENT REQUIRED BY
A CONDITION IMPOSED ON A GRANT OF PLANNING PERMISSION IN PRINCIPLE
Where the amount paid as mentioned in paragraph (b) is not less than
the amount which would be payable if the applicant were by the current
application seeking approval, consent or agreement in respect of all
matters requiring such approval, consent or agreement in terms of
conditions imposed on a grant of a planning permission in principle
and in relation to the whole of the development authorised by the
permission, the fee payable in respect of the current application is £500
Where:-
a) A fee has been paid as mentioned in sub-paragraph (b) as a rate
lower than that prevailing at the date of the current application, and
b) Sub-paragraph (2) would apply if that fee had been paid at the rate
applying at that date.
The fee of in respect of the current application is £500
Page 174 of 274

Page 175

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
CROSS BOUNDARY APPLICATIONS - ALLOCATION OF FEE
Where the applications are made for:-
a) Planning permission, or
b) The approval, consent, or agreement required by a condition imposed on a grant of
permission in principle, in respect of development of land lying in the areas of 2 or
more planning authorities.
ADVERTISEMENTS
All applications for express consent for the display of advertisements £300.00 £0.00 £300.00 £300.00 £0.00 £300.00
SECTION 42 APPLICATIONS
£300.00 £0.00 £300.00 £300.00 £0.00 £300.00
HIGH HEDGE APPLICATIONS
High Hedge Application Fee £310.00 £0.00 £310.00 £350.00 £0.00 £350.00
HAZARDOUS SUBSTANCES APPLICATIONS
£1,200.00 £0.00 £1,200.00 £1,200.00 £0.00 £1,200.00
Where an application is made under:-
i) Regulation 6 (other than an application referred to in sub-paragraph above);
ii) Regulation 7 (applications for removal of conditions attached to hazardous
substances consent); or
iii) Regulation 8 (application for continuation of hazardous substances consent where
there has been a change in the person in control of any part of the land).
See Town and Country Planning (Hazardous Substances) (Scotland) Regulations 2015
The total fee payable in respect of all the applications is the lesser of:
a) One and a half times the amount of the fee which would have been
payable for an application in respect of the same development but lying
in the area of a single planning authority.
b) The sum of the amounts of the fees which would have been payable
in respect of all the applications.
The fee payable to a planning authority in respect of such an application
is the proportion of the total fee payable equal to the proportion of the
total site area of the development which falls within the area of that
planning authority.
£600.00 £0.00 £600.00
The total fee payable in respect of all the applications is the lesser of:
a) One and a half times the amount of the fee which would have been
payable for an application in respect of the same development but lying
in the area of a single planning authority.
b) The sum of the amounts of the fees which would have been payable
in respect of all the applications.
The fee payable to a planning authority in respect of such an application
is the proportion of the total fee payable equal to the proportion of the
total site area of the development which falls within the area of that
planning authority.
TABLE 9
Other Fees
Applications for planning permission made under section 42 (applications to develop land
without complying with previous conditions) of the 1997 Act
Where an application is made under regulation 6 (applications for hazardous substances
consent) where the quantity specified in the application as the maximum quantity proposed
to be present exceeds twice the controlled quantity
£600.00 £0.00 £600.00
Page 175 of 274

Page 176

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
ADMINISTRATION CHARGES
Electronic planning history search £83.33 £16.67 £100.00 £83.33 £16.67 £100.00
Copy of planning Decision Notice £29.17 £5.83 £35.00 £33.33 £6.67 £40.00
Copy of plans and documents
Note - Charge is per case file request
Paper/Email Applications - Administration Charge - see note 8 below £20.83 £4.17 £25.00
Additional Fee for planning applications requiring advertisement in local press £50.92 £10.18 £61.10 £50.92 £10.18 £61.10
Contact: developmentmanagement@pkc.gov.uk for price confirmation
This service is for electronic copies only.
Contact: developmentmanagement@pkc.gov.uk for price confirmation
This service is for electronic copies only.
NOTES
1) All applications must be accompanied by the appropriate fee. As noted above, fees
will be checked at the point of validation.
2) The additional gross floor space created by the development must be clearly indicated
in square metres on the submitted plan. For the purposes of the fee regulations, gross
floor space includes all storeys, is measured externally including the thickness of internal
and external walls and can include areas under canopies.
3) The area of the site must be clearly stated in hectares on the application form and
the submitted plan.
4) There is no provision in the regulations for the refund of fees paid to Planning
Authorities in respect of applications which have been validated. Invalid or incomplete
applications will have fees returned if paid.
5) This is not a comprehensive list of fees.  If in doubt, please contact the Duty Planning
Officer on 01738 475300 or email developmentmanagement@pkc.gov.uk.  A copy of the
Town and Country Planning (Fees for Applications) (Scotland) Regulations 2022 is
available for inspection at Pullar House, 35 Kinnoull Street, Perth.
6) Pre-application advice and pre-validation checks may be offered by external planning
consultants but may not adhere to advice and validation checks provided/accepted by
Perth & Kinross Council.
7) One opportunity will be given to address invalidity issues prior to returning any application,
where an application is returned, a handling and administration fee will be retained.
8) All applications are now required to be submitted online, all applications submitted either
on paper copy or via email will be subject to an additional handling and administration fee.
Page 176 of 274

Page 177

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
BUILDING STANDARDS (FEE LIST FOR BUILDING WARRANT & ASS. PROCEDURES)
Value of Works (£)  -                                    
0 - 5,000 £150.00 £0.00 £150.00 £150.00 £0.00 £150.00
5,001 - 5,500 £169.00 £0.00 £169.00 £169.00 £0.00 £169.00
5,501 - 6,000 £188.00 £0.00 £188.00 £188.00 £0.00 £188.00
6,001 - 6,500 £207.00 £0.00 £207.00 £207.00 £0.00 £207.00
6,501 - 7,000 £226.00 £0.00 £226.00 £226.00 £0.00 £226.00
7,001 - 7,500 £245.00 £0.00 £245.00 £245.00 £0.00 £245.00
7,501 - 8,000 £264.00 £0.00 £264.00 £264.00 £0.00 £264.00
8,001 - 8,500 £283.00 £0.00 £283.00 £283.00 £0.00 £283.00
8,501 - 9,000 £302.00 £0.00 £302.00 £302.00 £0.00 £302.00
9,001 - 9,500 £321.00 £0.00 £321.00 £321.00 £0.00 £321.00
9,501 - 10,000 £340.00 £0.00 £340.00 £340.00 £0.00 £340.00
10,001 - 11,000 £359.00 £0.00 £359.00 £359.00 £0.00 £359.00
11,001 - 12,000 £378.00 £0.00 £378.00 £378.00 £0.00 £378.00
12,001 - 13,000 £397.00 £0.00 £397.00 £397.00 £0.00 £397.00
13,001 - 14,000 £416.00 £0.00 £416.00 £416.00 £0.00 £416.00
14,001 - 15,000 £435.00 £0.00 £435.00 £435.00 £0.00 £435.00
15,001 - 16,000 £454.00 £0.00 £454.00 £454.00 £0.00 £454.00
16,001 - 17,000 £473.00 £0.00 £473.00 £473.00 £0.00 £473.00
17,001 - 18,000 £492.00 £0.00 £492.00 £492.00 £0.00 £492.00
18,001 - 19,000 £511.00 £0.00 £511.00 £511.00 £0.00 £511.00
19,001 - 20,000 £530.00 £0.00 £530.00 £530.00 £0.00 £530.00
20,001 - 30,000 £593.00 £0.00 £593.00 £593.00 £0.00 £593.00
30,001 - 40,000 £656.00 £0.00 £656.00 £656.00 £0.00 £656.00
40,001 - 50,000 £719.00 £0.00 £719.00 £719.00 £0.00 £719.00
50,001 - 60,000 £782.00 £0.00 £782.00 £782.00 £0.00 £782.00
60,001 - 70,000 £845.00 £0.00 £845.00 £845.00 £0.00 £845.00
70,001 - 80,000 £908.00 £0.00 £908.00 £908.00 £0.00 £908.00
80,001 - 90,000 £971.00 £0.00 £971.00 £971.00 £0.00 £971.00
90,001 - 100,000 £1,034.00 £0.00 £1,034.00 £1,034.00 £0.00 £1,034.00
100,001 - 120,000 £1,137.00 £0.00 £1,137.00 £1,137.00 £0.00 £1,137.00
120,001  - 140,000 £1,240.00 £0.00 £1,240.00 £1,240.00 £0.00 £1,240.00
140,001 - 160,000 £1,343.00 £0.00 £1,343.00 £1,343.00 £0.00 £1,343.00
160,001 - 180,000 £1,446.00 £0.00 £1,446.00 £1,446.00 £0.00 £1,446.00
180,001 - 200,000 £1,549.00 £0.00 £1,549.00 £1,549.00 £0.00 £1,549.00
200,001 - 220,000 £1,652.00 £0.00 £1,652.00 £1,652.00 £0.00 £1,652.00
220,001 - 240,000 £1,755.00 £0.00 £1,755.00 £1,755.00 £0.00 £1,755.00
240,001 - 260,000 £1,858.00 £0.00 £1,858.00 £1,858.00 £0.00 £1,858.00
260,001 - 280,000 £1,961.00 £0.00 £1,961.00 £1,961.00 £0.00 £1,961.00
280,001 - 300,000 £2,064.00 £0.00 £2,064.00 £2,064.00 £0.00 £2,064.00
300,001 - 320,000 £2,167.00 £0.00 £2,167.00 £2,167.00 £0.00 £2,167.00
320,001 - 340,000 £2,270.00 £0.00 £2,270.00 £2,270.00 £0.00 £2,270.00
340,001 - 360,000 £2,373.00 £0.00 £2,373.00 £2,373.00 £0.00 £2,373.00
360,001 - 380,000 £2,476.00 £0.00 £2,476.00 £2,476.00 £0.00 £2,476.00
380,001 - 400,000 £2,579.00 £0.00 £2,579.00 £2,579.00 £0.00 £2,579.00
BUILDING STANDARDS
Page 177 of 274

Page 178

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
400,001 - 420,000 £2,682.00 £0.00 £2,682.00 £2,682.00 £0.00 £2,682.00
420,001 - 440,000 £2,785.00 £0.00 £2,785.00 £2,785.00 £0.00 £2,785.00
440,001 - 460,000 £2,888.00 £0.00 £2,888.00 £2,888.00 £0.00 £2,888.00
460,001 - 480,000 £2,991.00 £0.00 £2,991.00 £2,991.00 £0.00 £2,991.00
480,001 - 500,000 £3,094.00 £0.00 £3,094.00 £3,094.00 £0.00 £3,094.00
500,001 - 550,000 £3,272.00 £0.00 £3,272.00 £3,272.00 £0.00 £3,272.00
550,001 - 600,000 £3,450.00 £0.00 £3,450.00 £3,450.00 £0.00 £3,450.00
600,001 - 650,000 £3,628.00 £0.00 £3,628.00 £3,628.00 £0.00 £3,628.00
650,001 - 700,000 £3,806.00 £0.00 £3,806.00 £3,806.00 £0.00 £3,806.00
700,001 - 750,000 £3,984.00 £0.00 £3,984.00 £3,984.00 £0.00 £3,984.00
750,001 - 800,000 £4,162.00 £0.00 £4,162.00 £4,162.00 £0.00 £4,162.00
800,001 - 850,000 £4,340.00 £0.00 £4,340.00 £4,340.00 £0.00 £4,340.00
850,001 - 900,000 £4,518.00 £0.00 £4,518.00 £4,518.00 £0.00 £4,518.00
900,001 - 950,000 £4,696.00 £0.00 £4,696.00 £4,696.00 £0.00 £4,696.00
950,001 - 1,000,000 £4,874.00 £0.00 £4,874.00 £4,874.00 £0.00 £4,874.00
1,000,001 + And for every £100,000 or part thereof over £1 million add £253 And for every £100,000 or part thereof over £1 million add £253
Conversion only, without building work £150.00 £0.00 £150.00 £150.00 £0.00 £150.00
Application for demolition only £150.00 £0.00 £150.00 £150.00 £0.00 £150.00
Application for Amendment of Warrant (warrants received after 1 May 2005)
Where estimated costs are less than original or is an increase of no more than £5,000 £100.00 £0.00 £100.00 £100.00 £0.00 £100.00
Where the new estimated costs increase by more than £5,000
For demolition or conversion only £100.00 £0.00 £100.00 £100.00 £0.00 £100.00
Application for extension of the duration of a Building Warrant (period 9 months) £100.00 £0.00 £100.00 £100.00 £0.00 £100.00
NB. Further extensions may be agreed at discretion of Verifier
Late Application (where work is already started):-
Late application for a building warrant for the construction of a building or the
provision of services, fittings and equipment in connection with a building.
Late application for demolition only £200.00 £0.00 £200.00 £200.00 £0.00 £200.00
Completion Certificate Submitted where no warrant is obtained:-
For the construction of a building or the provision of services, fittings and equipment in
connection with a building (whether or not combined with an application for demolition)
For the demolition of a building only £300.00 £0.00 £300.00 £300.00 £0.00 £300.00
For conversion of a building only £300.00 £0.00 £300.00 £300.00 £0.00 £300.00
Fee is the amount for a building warrant of the same value as the increase
e.g. if increase is £20,000; fee will be £530
Fee is 200% of the fee in table of fees above
Fee is the same as for a late application for building warrant of the same
value of works, that is 300% of the fee in the table of fees above
Fee is the amount for a building warrant of the same value as the increase
e.g. if increase is £20,000; fee will be £530
Fee is 200% of the fee in table of fees above
Fee is the same as for a late application for building warrant of the same
value of works, that is 300% of the fee in the table of fees above
Page 178 of 274

Page 179

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
Section 89 Applications:-
Raised Platform or Stage <30m square £150.00 £0.00 £150.00 £150.00 £0.00 £150.00
Raised Platform or Stage <30m square with overhead gantry £200.00 £0.00 £200.00 £200.00 £0.00 £200.00
Raised Platform or Stage >30m square £300.00 £0.00 £300.00 £300.00 £0.00 £300.00
Raised Seating £300.00 £0.00 £300.00 £300.00 £0.00 £300.00
Out of hours Inspections - additional fee £100.00 £0.00 £100.00 £100.00 £0.00 £100.00
Late Applications - additional fee (within 14 days of event)
Letter of Comfort where no Building Warrant obtained £360.00 £0.00 £360.00 £375.00 £0.00 £375.00
Letter of Comfort with Building Warrant but no Certificate of Completion £185.00 £0.00 £185.00 £192.00 £0.00 £192.00
Confirmation of Exemption £82.00 £0.00 £82.00 £85.00 £0.00 £85.00
Confirmation of Compliance £110.00 £0.00 £110.00 £114.00 £0.00 £114.00
Electronic Copy of Planning Approval/Refusal Document £29.17 £5.83 £35.00 £33.33 £6.67 £40.00
Electronic Copy of Certificate of Completion £29.17 £5.83 £35.00 £33.33 £6.67 £40.00
Electronic Copy of Building Warrant/Refusal Decision Letter £29.17 £5.83 £35.00 £33.33 £6.67 £40.00
Paper Copy of Plans and Documents
Note - Charge is per case file request
Paper/Email Applications - Administration Charge - see note 2 below £20.83 £4.17 £25.00
Local Development Plan £50.00 £0.00 £50.00 £50.00 £0.00 £50.00
Search Fee (Building Standards - 25 Years) £83.33 £16.67 £100.00 £83.33 £16.67 £100.00
Property Enquiries £83.33 £16.67 £100.00 £83.33 £16.67 £100.00
Application Fee + 50%
By arrangement with Communities Service
Application Fee + 50%
ADMINISTRATION CHARGES
By arrangement with Communities Service
NOTES
1) Section 89 Application - Fees may be waived for charitable events and fees will be
reduced by one third (33%) for repeat applications.
2) All applications are now required to be submitted online, all applications submitted either
on paper copy or via email will be subject to an additional handling and administration fee.
Page 179 of 274

Page 180

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
16: STREET NAMING & NUMBERING, ROAD CONSTRUCTION
CONSENTS & VEHICULAR ACCESS
STREET NAMING & PROPERTY NUMBERING/RENUMBERING
Naming a new street £245.00 £0.00 £245.00 £255.00 £0.00 £255.00
Numbering / Renumbering Properties
1 Property £75.00 £0.00 £75.00 £80.00 £0.00 £80.00
2-5 Properties £135.00 £0.00 £135.00 £140.00 £0.00 £140.00
6-10 Properties £165.00 £0.00 £165.00 £170.00 £0.00 £170.00
11-25 Properties £210.00 £0.00 £210.00 £220.00 £0.00 £220.00
26-50 Properties £340.00 £0.00 £340.00 £355.00 £0.00 £355.00
51-100 Properties £665.00 £0.00 £665.00 £690.00 £0.00 £690.00
101-150 Properties £975.00 £0.00 £975.00 £1,015.00 £0.00 £1,015.00
151-200 Properties £1,170.00 £0.00 £1,170.00 £1,220.00 £0.00 £1,220.00
201+ Properties £1,295 + £5 per plot £0.00 £1,295 + £5 per plot £1,345 + £5 per plot £0.00 £1,345 + £5 per plot
Numbering / Renumbering a New Development
Registering an existing property or renaming a property £75.00 £0.00 £75.00 £80.00 £0.00 £80.00
Additional Services
Confirmation of an existing address  - per address (solicitor or private enquires) £43.00 £0.00 £43.00 £45.00 £0.00 £45.00
Status of Roads - Confirmation on status of sections of road (e.g. solicitors or agents) * £43.00 £0.00 £43.00 £45.00 £0.00 £45.00
*Larger or more complex requests may incur additional charges
Road Construction Consent/Road Adoption - Charge Per Officer Hour £72.00 £0.00 £72.00 £75.00 £0.00 £75.00
Vehicular Access where Planning Permission is not required * £300.00 £0.00 £300.00 £300.00 £0.00 £300.00
*Fees are linked to Householder Planning Application Fee
As listed above less the street naming feesAs listed above less the street naming fees
Page 180 of 274

Page 181

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
ELECTRICAL VEHICLE CHARGING
AC Charging (7kW)
Charging Cost - Minimum Fee £1.00 £0.25/kWh £0.05/kWh £0.30/kWh £0.38/kWh £0.07/kWh £0.45/kWh
AC Charging (22-25kW)
Charging Cost - Minimum Fee £1.00 £0.25/kWh £0.05/kWh £0.30/kWh £0.38/kWh £0.07/kWh £0.45/kWh
Overstay Fee £8.33 after 4 hours £1.67 after 4 hours £10.00 after 4 hours £8.33 after 4 hours £1.67 after 4 hours £10.00 after 4 hours
Rapid Charging (43kW+)
Charging Cost - Minimum Fee £1.00 £0.29/kWh £0.06/kWh £0.35/kWh £0.42/kWh £0.08/kWh £0.50/kWh
Overstay Fee £8.33 after 1 hour £1.67 after 1 hour £10.00 after 1 hour £8.33 after 1 hour £1.67 after 1 hour £10.00 after 1 hour
BUS DEPARTURE CHARGES
Blairgowrie - Wellmeadow Bus Stance - Per Departure:-
Local bus service departures £0.05 £0.01 £0.06 £0.05 £0.01 £0.06
Perth Bus Station - Per Departure:-
Local bus service departures £1.60 £0.32 £1.92 £1.60 £0.32 £1.92
Express coach service departures £2.30 £0.46 £2.76 £2.40 £0.48 £2.88
Perth Bus Station - Per Departure:-
Express coach service departures £2.30 £0.46 £2.76 £2.40 £0.48 £2.88
PRIVATE LANDLORDS CHARGES
Tenancy Management Services - Per Property Per Year £360.00 £72.00 £432.00
Climate Change and Sustainability Committee approved the "Introductions of Charging for
Electric Vehicles" (Report No 22/191) on 24 August 2022. The recommendation approved
was the Executive Director (Communities) keep tariff rates under review during the year,
with delegation to amend the tariff to ensure that future costs continue to be recovered,
alongside an annual review to be undertaken as part of the budget process.
19: HOUSING MANAGEMENT SERVICES CHARGING
7.5% of rent charged + VAT
(Subject to a maximum charge of £500 + VAT per property per year)
17: ELECTRICAL VEHICLE CHARGING
18: PUBLIC TRANSPORT CHARGING
Page 181 of 274

Page 182

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
20: SCHOOL MEALS & BREAKFAST CLUBS
Primary Pupils £2.15 £0.00 £2.15 £2.90 £0.00 £2.90
Secondary Pupils £2.30 £0.00 £2.30 £3.15 £0.00 £3.15
Adult Meals £3.08 £0.62 £3.70 £4.17 £0.83 £5.00
Breakfast Clubs £2.00 £0.00 £2.00 £2.00 £0.00 £2.00
The above prices are effective from 15 April 2024.
21: CHILDCARE STRATEGY SERVICES
KIDS CLUBS:
Term Time:
One Child £9.70 £0.00 £9.70 £9.70 £0.00 £9.70
Additional Child £9.20 £0.00 £9.20 £9.20 £0.00 £9.20
Holidays and In-Service Days:
Up to 5 Hours £19.00 £0.00 £19.00 £19.00 £0.00 £19.00
Up to 7 Hours £21.25 £0.00 £21.25 £21.25 £0.00 £21.25
7 Hours+ £23.50 £0.00 £23.50 £23.50 £0.00 £23.50
EARLY LEARNING AND CHILDCARE
Per Hour £4.85 £0.00 £4.85 £4.85 £0.00 £4.85
Meal and Snack Charge per day - included £3.00 £0.00 £3.00 £3.00 £0.00 £3.00
Per 6 Hour Session Including Meal and Snack £32.10 £0.00 £32.10 £32.10 £0.00 £32.10
22: SCHOOL / COMMUNITY CAMPUS / ASTRO PITCHES LETS
SCHOOL & COMMUNITY CAMPUS:
Standard
Small (Class Size) - Rate Per Hour £10.00 £0.00 £10.00 £10.00 £0.00 £10.00
Medium (Primary Hall / Specialist*) - Rate Per Hour £15.00 £0.00 £15.00 £15.00 £0.00 £15.00
Large (Secondary Hall / Gym) - Rate Per Hour £20.00 £0.00 £20.00 £20.00 £0.00 £20.00
Standard Junior: (Under 18)
Small (Class Size) - Rate Per Hour £6.00 £0.00 £6.00 £6.00 £0.00 £6.00
Medium (Primary Hall / Specialist*) - Rate Per Hour £8.00 £0.00 £8.00 £8.00 £0.00 £8.00
Large (Secondary Hall / Gym) - Rate Per Hour £12.00 £0.00 £12.00 £12.00 £0.00 £12.00
Concession:
Small (Class Size) - Rate Per Hour £8.00 £0.00 £8.00 £8.00 £0.00 £8.00
Medium (Primary Hall / Specialist*) - Rate Per Hour £10.00 £0.00 £10.00 £10.00 £0.00 £10.00
Large (Secondary Hall / Gym) - Rate Per Hour £16.00 £0.00 £16.00 £16.00 £0.00 £16.00
N.B. There will be no change to the Registration Fee for Kids Clubs at £13 for a single
child and £20 for families.
The above prices are effective from 1 July 2024 and 14 August 2024 for Early Learning
& Childcare
Page 182 of 274

Page 183

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
Concession Junior: (Under 18)
Small (Class Size) - Rate Per Hour £5.00 £0.00 £5.00 £5.00 £0.00 £5.00
Medium (Primary Hall / Specialist*) - Rate Per Hour £6.00 £0.00 £6.00 £6.00 £0.00 £6.00
Large (Secondary Hall / Gym) - Rate Per Hour £10.00 £0.00 £10.00 £10.00 £0.00 £10.00
Community Campus Meeting Packages:
Bronze - Half Day (4 Hours) £5.15 £0.00 £5.15 £5.15 £0.00 £5.15
Silver - Half Day (4 Hours) £7.15 £0.00 £7.15 £7.15 £0.00 £7.15
Gold - Half Day (4 Hours) £10.25 £0.00 £10.25 £10.25 £0.00 £10.25
Bronze - Full Day (8 Hours) £8.20 £0.00 £8.20 £8.20 £0.00 £8.20
Silver - Full Day (8 Hours) £14.35 £0.00 £14.35 £14.35 £0.00 £14.35
Gold - Full Day (8 Hours) £18.45 £0.00 £18.45 £18.45 £0.00 £18.45
For performance bookings, or bookings where tickets are sold, a box office charge
of 20% of sales may be considered as an alternative to the above charges.
ASTRO TURF:
Standard
Junior - One Third Pitch (Per Hour) £25.00 £5.00 £30.00 £25.00 £5.00 £30.00
Junior - Two Third Pitch (Per Hour) £29.17 £5.83 £35.00 £29.17 £5.83 £35.00
Junior - Full Pitch (Per Hour) £41.67 £8.33 £50.00 £41.67 £8.33 £50.00
Adult - One Third Pitch (Per Hour) £29.17 £5.83 £35.00 £29.17 £5.83 £35.00
Adult - Two Third Pitch (Per Hour) £37.50 £7.50 £45.00 £37.50 £7.50 £45.00
Adult - Full Pitch (Per Hour) £50.00 £10.00 £60.00 £50.00 £10.00 £60.00
PERTH HIGH COMMUNITY SPORTS HUB:
Standard
Small (Meeting Room) - Rate Per Hour £10.00 £0.00 £10.00 £10.00 £0.00 £10.00
Large (Hall) - Rate Per Hour £20.00 £0.00 £20.00 £20.00 £0.00 £20.00
Standard Junior
Small (Meeting Room) - Rate Per Hour £6.00 £0.00 £6.00 £6.00 £0.00 £6.00
Large (Hall) - Rate Per Hour £12.00 £0.00 £12.00 £12.00 £0.00 £12.00
Concession:
Small (Meeting Room / Outdoor Usage) - Rate Per Hour £8.00 £0.00 £8.00 £8.00 £0.00 £8.00
Large (Hall) - Rate Per Hour £16.00 £0.00 £16.00 £16.00 £0.00 £16.00
Concession Junior: (Under 18)
Small (Meeting Room / Outdoor Usage) - Rate Per Hour £5.00 £0.00 £5.00 £5.00 £0.00 £5.00
Large (Hall) - Rate Per Hour £10.00 £0.00 £10.00 £10.00 £0.00 £10.00
Page 183 of 274

Page 184

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
GEORGE DUNCAN ATHLETICS ARENA
Pay and Play - Junior £1.10 £0.00 £1.10 £1.10 £0.00 £1.10
Pay and Play - Adult £2.30 £0.00 £2.30 £2.30 £0.00 £2.30
Exempt:
All Council Services
Parent Councils / Elections
Kids Club (Non Profit Making)
User Type:
Junior = Under 18 Activities.
Community Campuses:
Blairgowrie, Breadalbane, Glenearn, Loch Leven, North Inch, Strathearn
The above prices are effective from 1 August 2024.
23: INSTRUMENTAL MUSIC TUITION - CENTRAL GROUPS
Central Groups £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
24: CONSULTANCY AND STAFF DEVELOPMENT
Charges for Authority Staff £673.00 £0.00 £673.00 £673.00 £0.00 £673.00
25: WELLBANK HOUSE - RENT
Rent (Weekly) £64.52 £0.00 £64.52 £64.52 £0.00 £64.52
Eligible Rent (Weekly) £179.85 £0.00 £179.85 £179.85 £0.00 £179.85
Ineligible Amenity Charge (Weekly) £18.27 £0.00 £18.27 £18.27 £0.00 £18.27
Total Rent Charge (Weekly) £262.64 £0.00 £262.64 £262.64 £0.00 £262.64
Concession = Non profit community benefit groups such as Adult Education Associations,
MP/MSP/MEP, Religious Activities, Community Planning Partners, Local Voluntary &
Charitable Organisations. Youth groups where instructor /club leader does not retain income.
Commercial = Individuals or Commercial Groups/Organisations
who are profit making - Price on Request
Standard = All groups that do not fall under the Concession criteria, groups where instructor
retains income.
*All Specialist rooms will have restricted access and require initial contact with the
Campus Business Manager to confirm bookings.
*Please note that the above charges do not apply to Community Campus sports
facilities managed by Live Active Leisure
Page 184 of 274

Page 185

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
26. CARE AND SUPPORT SERVICES
CARE AND SUPPORT SERVICES
Local Authority Residential Care (Per Week) £1,009.66 £1,045.71
OCCUPATIONAL THERAPY EQUIPMENT (MEANS TESTED)
OT Maintenance - Stair Lift / Step Lift / Platform Lift / Stair Climber (Annual Charge) £159.00 £159.00
OT Maintenance - Through Floor Lift (Annual Charge) £279.00 £279.00
OT Maintenance - Overhead Tracking Hoist (Annual Charge) £178.00 £159.00
OT Maintenance - Closomat (Annual Charge) £55.00 £55.00
CONTRIBUTION POLICY CHARGEABLE SERVICES (MEANS TESTED)
Community Alarm / Telecare (Weekly Charge) £4.62 £4.94
New Rannoch Day Care (Daily Rate) £58.14 £62.21
Day opportunities Older People (Daily Rate) £29.35 £31.40
Gleneagles Day Opportunities (Daily Rate) £43.35 £46.38
Kinnoull & Blairgowrie Day Opportunities (Daily Rate) £38.04 £40.70
External Transport (Per Journey) £18.57 £19.87
STAFF MEALS (PER MEAL)
Breakfast £1.68 £1.74
Lunch £3.36 £3.48
Tea/Supper £1.36 £1.40
Snack £0.92 £0.95
27: DESIGN WORKS
Designer - Charge per Hour £50.00 £10.00 £60.00 £50.00 £10.00 £60.00
Design Assistant - Charge per Hour £35.00 £7.00 £42.00 £35.00 £7.00 £42.00
Benchmarking was undertaken through Creative Exchange which is a group for
all Scottish Local Authority Graphic Design Teams in 2013 and these charges
reflect the rates applied at this time.
Page 185 of 274

Page 186

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
28: PERTH & KINROSS LICENSING BOARD
FEES UNDER THE LICENSING (SCOTLAND) ACT 2005
PREMISES LICENCE APPLICATION
Category 1 £200 £0 £200 £200 £0 £200
Category 2 £800 £0 £800 £800 £0 £800
Category 3 £1,100 £0 £1,100 £1,100 £0 £1,100
Category 4 £1,300 £0 £1,300 £1,300 £0 £1,300
Category 5 £1,700 £0 £1,700 £1,700 £0 £1,700
Category 6 £2,000 £0 £2,000 £2,000 £0 £2,000
PREMISES LICENCE ANNUAL FEE
Category 1 £180 £0 £180 £180 £0 £180
Category 2 £220 £0 £220 £220 £0 £220
Category 3 £280 £0 £280 £280 £0 £280
Category 4 £500 £0 £500 £500 £0 £500
Category 5 £700 £0 £700 £700 £0 £700
Category 6 £900 £0 £900 £900 £0 £900
PROVISIONAL PREMISES LICENCE APPLICATION
(All categories) £200 £0 £200 £200 £0 £200
CONFIRMATION OF A PROVISIONAL PREMISES LICENCE
Category 1 £0 £0 £0 £0 £0 £0
Category 2 £600 £0 £600 £600 £0 £600
Category 3 £900 £0 £900 £900 £0 £900
Category 4 £1,100 £0 £1,100 £1,100 £0 £1,100
Category 5 £1,500 £0 £1,500 £1,500 £0 £1,500
Category 6 £1,800 £0 £1,800 £1,800 £0 £1,800
APPLICATION FOR TRANSFER UNDER SECTION 33
On its own £50 £0 £50 £50 £0 £50
Including an application for minor variation under section 35(1) £60 £0 £60 £60 £0 £60
Including an application for variation (which is
not a minor variation) under section 35(1)
Category 1 £75 £0 £75 £75 £0 £75
Category 2 £225 £0 £225 £225 £0 £225
Category 3 £300 £0 £300 £300 £0 £300
Category 4 £350 £0 £350 £350 £0 £350
Category 5 £450 £0 £450 £450 £0 £450
Category 6 £525 £0 £525 £525 £0 £525
Page 186 of 274

Page 187

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
APPLICATION FOR TRANSFER UNDER SECTION 34
On its own £50 £0 £50 £50 £0 £50
Including an application for minor variation under section 35(1) £60 £0 £60 £60 £0 £60
Including an application for variation (which is
not a minor variation) under section 35(1)
Category 1 £75 £0 £75 £75 £0 £75
Category 2 £225 £0 £225 £225 £0 £225
Category 3 £300 £0 £300 £300 £0 £300
Category 4 £350 £0 £350 £350 £0 £350
Category 5 £450 £0 £450 £450 £0 £450
Category 6 £525 £0 £525 £525 £0 £525
APPLICATION TO VARY UNDER SECTION 29
Minor variation £20 £0 £20 £20 £0 £20
Variation under section 31(1) on its own or with a minor variation £31 £0 £31 £31 £0 £31
Other variations:
Category 1 £50 £0 £50 £50 £0 £50
Category 2 £200 £0 £200 £200 £0 £200
Category 3 £275 £0 £275 £275 £0 £275
Category 4 £325 £0 £325 £325 £0 £325
Category 5 £425 £0 £425 £425 £0 £425
Category 6 £500 £0 £500 £500 £0 £500
FEES UNDER THE LICENSING (SCOTLAND) ACT 2005
Application For Temporary Premises Licence £150 £0 £150 £150 £0 £150
Personal Licence £50 £0 £50 £50 £0 £50
Issuing Replacement Personal Licence £10 £0 £10 £10 £0 £10
Occasional Licence £10 £0 £10 £10 £0 £10
Extended Hours Application £10 £0 £10 £10 £0 £10
Certified Copy Premises Licence £10 £0 £10 £10 £0 £10
All fees under the Licensing (Scotland) Act 2005 have been placed at the statutory
maximum with exception of Applications for Transfer under section 33 and 34,
categories 1 to 6 and Application to Vary under section 29 categories 1 to 6.
Page 187 of 274

Page 188

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
LICENCE FEES
Taxi/Private Hire Car Driver’s Licence (New):
1 Year £143 £0 £143 £149 £0 £149
3 Years £199 £0 £199 £207 £0 £207
Taxi/Private Hire Car Driver’s Licence (Renewal):
1 Year £117 £0 £117 £122 £0 £122
3 Years £173 £0 £173 £180 £0 £180
Taxi Operator’s Licence:
WAV £71 £0 £71 £74 £0 £74
ULH £138 £0 £138 £144 £0 £144
Car £286 £0 £286 £297 £0 £297
Private Hire Operator’s Licence:
WAV £61 £0 £61 £63 £0 £63
ULH £117 £0 £117 £122 £0 £122
Car £240 £0 £240 £250 £0 £250
Taxi Booking Office:
1 Year £199 £0 £199 £207 £0 £207
3 Years £265 £0 £265 £276 £0 £276
Test Fee:
With Meter £95.00 £0 £95.00
Without Meter £57.50 £0 £57.50
Vehicle Substitution:
Private Hire £35.00 £0 £35.00 £60.00 £0 £60.00
Taxi £30.00 £0 £30.00 £40.00 £0 £40.00
Meter Test Only £37.50 £0 £37.50 £37.50 £0 £37.50
Change of Vehicle Registration £46 £0 £46 £48 £0 £48
Taxi Plate & Mounting:
Plate brackets front and back £30 £0 £30 £30 £0 £30
Plate (each) £15 £0 £15 £15 £0 £15
Advertisement £71 £0 £71 £74 £0 £74
Replacement Badge £10 £0 £10 £10 £0 £10
No Longer Required
No Longer Required
29: AMENDED FEES UNDER CIVIC GOVERNMENT (SCOTLAND) ACT 1982
Page 188 of 274

Page 189

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
Replacement door stickers (each) £10 £0 £10 £10 £0 £10
Internal complaint badge and wallet No Charge No Charge £10 £0 £10
Window Cleaner:
1 Year £112 £0 £112 £116 £0 £116
3 Years £168 £0 £168 £175 £0 £175
Street Trader:
1 Year £168 £0 £168 £175 £0 £175
3 Years £240 £0 £240 £250 £0 £250
Street Trader (Variation) - 1 Year £107 £0 £107 £111 £0 £111
Second Hand Motor Dealer:
1 Year £209 £0 £209 £217 £0 £217
3 Years £311 £0 £311 £323 £0 £323
Second Hand Dealer:
1 Year £209 £0 £209 £217 £0 £217
3 Years £311 £0 £311 £323 £0 £323
Stamp Fairs - 1 Year £41 £0 £41 £43 £0 £43
Stall (Antiques Fair) - 1 Year £66 £0 £66 £69 £0 £69
Cabinet:
1 Year £66 £0 £66 £69 £0 £69
3 Years £158 £0 £158 £164 £0 £164
Market Operator:
1 Year £219 £0 £219 £228 £0 £228
3 Years £291 £0 £291 £303 £0 £303
1 Year £105 £0 £105 £109 £0 £109
3 Years £185 £0 £185 £192 £0 £192
Late Hours Catering:
1 Year £362 £0 £362 £376 £0 £376
3 Years £418 £0 £418 £435 £0 £435
Metal Dealer:
1 Year £219 £0 £219 £228 £0 £228
3 Years £291 £0 £291 £303 £0 £303
Itinerant Metal Dealer:
1 Year £128 £0 £128 £133 £0 £133
3 Years £194 £0 £194 £202 £0 £202
Market Operator licence when a public entertainment licence is
already in place for the same premises:
Page 189 of 274

Page 190

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
Indoor Sports Entertainment:
1 Year £199 £0 £199 £207 £0 £207
3 Years £270 £0 £270 £281 £0 £281
Sex Shop Licence £1,250 £0 £1,250 £1,300 £0 £1,300
Sexual Entertainment Licence £1,535 £0 £1,535 £1,596 £0 £1,596
Skin Piercing and Tattooing Licence:
1 Year £260 £0 £260 £270 £0 £270
3 Years £321 £0 £321 £334 £0 £334
Small Lotteries:
Licence £40 £0 £40 £40 £0 £40
Renewal £20 £0 £20 £20 £0 £20
Material Change Civic £71 £0 £71 £74 £0 £74
Knife Dealers:
1 Year £260 £0 £260 £270 £0 £270
3 Years £311 £0 £311 £323 £0 £323
Knife Dealers (Fair) £66 £0 £66 £69 £0 £69
PUBLIC ENTERTAINMENT
Community/Village Halls:
1 Year £189 £0 £189 £197 £0 £197
3 Years £250 £0 £250 £260 £0 £260
Capacity < 200:
1 Year £189 £0 £189 £197 £0 £197
3 Years £250 £0 £250 £260 £0 £260
Capacity 201 – 1500:
1 Year £301 £0 £301 £313 £0 £313
3 Years £367 £0 £367 £382 £0 £382
Capacity 1501 – 5000:
1 Year £729 £0 £729 £758 £0 £758
3 Years £836 £0 £836 £869 £0 £869
Capacity 5001 – 20000:
1 Year £1,566 £0 £1,566 £1,629 £0 £1,629
3 Years £2,086 £0 £2,086 £2,169 £0 £2,169
Capacity >20000:
1 Year £3,126 £0 £3,126 £3,251 £0 £3,251
3 Years £4,167 £0 £4,167 £4,334 £0 £4,334
Page 190 of 274

Page 191

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
Funfair:
1 Year £311 £0 £311 £323 £0 £323
3 Years £500 £0 £500 £520 £0 £520
Fun Fair/Inflatables with less than 5 kids rides at Community Event £65 £0 £65 £68 £0 £68
HOUSES IN MULTIPLE OCCUPATION - Housing (Scotland) Act 2006
Occupancy 3-5 £714 £0 £714 £714 £0 £714
Occupancy 6-20 £760 £0 £760 £760 £0 £760
Occupancy 21-75 £862 £0 £862 £862 £0 £862
Occupancy 76+ £954 £0 £954 £954 £0 £954
Variation to HMO £71 £0 £71 £71 £0 £71
SHORT-TERM LET LICENCE FEES
3-Year Licence New/Renewal
Secondary Letting Licence
Occupancy 1-2 Guests £350 £0 £350 £350 £0 £350
Occupancy 3-6 Guests £530 £0 £530 £530 £0 £530
Occupancy 7-10 Guests £900 £0 £900 £900 £0 £900
Occupancy 11+ Guests £1,600 £0 £1,600 £1,600 £0 £1,600
Home Letting Licence:
Occupancy 1-2 Guests £175 £0 £175 £175 £0 £175
Occupancy 3-6 Guests £265 £0 £265 £265 £0 £265
Occupancy 7-10 Guests £450 £0 £450 £450 £0 £450
Occupancy 11+ Guests £800 £0 £800 £800 £0 £800
Home Sharing Licence:
Occupancy 1-2 Guests £175 £0 £175 £175 £0 £175
Occupancy 3-6 Guests £265 £0 £265 £265 £0 £265
Occupancy 7-10 Guests £450 £0 £450 £450 £0 £450
Occupancy 11+ Guests £800 £0 £800 £800 £0 £800
Home Letting and Home Sharing Licence:
Occupancy 1-2 Guests £175 £0 £175 £175 £0 £175
Occupancy 3-6 Guests £265 £0 £265 £265 £0 £265
Occupancy 7-10 Guests £450 £0 £450 £450 £0 £450
Occupancy 11+ Guests £800 £0 £800 £800 £0 £800
Temporary Licence (Maximum Period of 6 Weeks)
Secondary Letting Licence
Occupancy 1-2 Guests £175 £0 £175 £175 £0 £175
Occupancy 3-6 Guests £270 £0 £270 £270 £0 £270
Occupancy 7-10 Guests £450 £0 £450 £450 £0 £450
Occupancy 11+ Guests £800 £0 £800 £800 £0 £800
The report “Review of Licence Fees” approved all amended fees
under Civic Government (Scotland) Act 1982 (Report No. 12/173 refers).
Page 191 of 274

Page 192

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
Home Letting Licence:
Occupancy 1-2 Guests £90 £0 £90 £90 £0 £90
Occupancy 3-6 Guests £135 £0 £135 £135 £0 £135
Occupancy 7-10 Guests £225 £0 £225 £225 £0 £225
Occupancy 11+ Guests £400 £0 £400 £400 £0 £400
Home Sharing Licence:
Occupancy 1-2 Guests £90 £0 £90 £90 £0 £90
Occupancy 3-6 Guests £135 £0 £135 £135 £0 £135
Occupancy 7-10 Guests £225 £0 £225 £225 £0 £225
Occupancy 11+ Guests £400 £0 £400 £400 £0 £400
Home Letting and Home Sharing Licence:
Occupancy 1-2 Guests £90 £0 £90 £90 £0 £90
Occupancy 3-6 Guests £135 £0 £135 £135 £0 £135
Occupancy 7-10 Guests £225 £0 £225 £225 £0 £225
Occupancy 11+ Guests £400 £0 £400 £400 £0 £400
Temporary Exemption (Max. Period of 6 Weeks in any 12 Month Period)
Secondary Letting Licence
Occupancy 1-2 Guests £90 £0 £90 £90 £0 £90
Occupancy 3-6 Guests £135 £0 £135 £135 £0 £135
Occupancy 7-10 Guests £225 £0 £225 £225 £0 £225
Occupancy 11+ Guests £400 £0 £400 £400 £0 £400
Home Letting Licence:
Occupancy 1-2 Guests £45 £0 £45 £45 £0 £45
Occupancy 3-6 Guests £70 £0 £70 £70 £0 £70
Occupancy 7-10 Guests £115 £0 £115 £115 £0 £115
Occupancy 11+ Guests £200 £0 £200 £200 £0 £200
Home Sharing Licence:
Occupancy 1-2 Guests £45 £0 £45 £45 £0 £45
Occupancy 3-6 Guests £70 £0 £70 £70 £0 £70
Occupancy 7-10 Guests £115 £0 £115 £115 £0 £115
Occupancy 11+ Guests £200 £0 £200 £200 £0 £200
Home Letting and Home Sharing Licence:
Occupancy 1-2 Guests £45 £0 £45 £45 £0 £45
Occupancy 3-6 Guests £70 £0 £70 £70 £0 £70
Occupancy 7-10 Guests £115 £0 £115 £115 £0 £115
Occupancy 11+ Guests £200 £0 £200 £200 £0 £200
Material Change of Circumstances - Premises
Secondary Letting Licence
Occupancy 1-2 Guests £175 £0 £175 £175 £0 £175
Occupancy 3-6 Guests £270 £0 £270 £270 £0 £270
Occupancy 7-10 Guests £450 £0 £450 £450 £0 £450
Occupancy 11+ Guests £800 £0 £800 £800 £0 £800
Page 192 of 274

Page 193

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
Home Letting Licence:
Occupancy 1-2 Guests £90 £0 £90 £90 £0 £90
Occupancy 3-6 Guests £135 £0 £135 £135 £0 £135
Occupancy 7-10 Guests £225 £0 £225 £225 £0 £225
Occupancy 11+ Guests £400 £0 £400 £400 £0 £400
Home Sharing Licence:
Occupancy 1-2 Guests £90 £0 £90 £90 £0 £90
Occupancy 3-6 Guests £135 £0 £135 £135 £0 £135
Occupancy 7-10 Guests £225 £0 £225 £225 £0 £225
Occupancy 11+ Guests £400 £0 £400 £400 £0 £400
Home Letting and Home Sharing Licence:
Occupancy 1-2 Guests £90 £0 £90 £90 £0 £90
Occupancy 3-6 Guests £135 £0 £135 £135 £0 £135
Occupancy 7-10 Guests £225 £0 £225 £225 £0 £225
Occupancy 11+ Guests £400 £0 £400 £400 £0 £400
Variation of Licence £75 £0 £75 £75 £0 £75
Material Change of Circumstance - Licence Holder £75 £0 £75 £75 £0 £75
Duplicate Licences £20 £0 £20 £20 £0 £20
Certified True Copy of any Entry on the Public Register £20 £0 £20 £20 £0 £20
PROFESSIONAL FEES
Fees are placed at a level which reflects the fact that the Council wants to attract
business. The Council only recover fees where the transaction involves a third
party (e.g. lease/servitude) and it is reasonable to recover them from the third party.
PROPERTY SALES
Any fee is agreed with Estates which is then deducted off the
capital receipt.
SECTION 75
The Council charge £500 which is broadly in line with other Councils. This is notified
to the other party at the start of the transaction and recovered at the end of the
transaction before the planning consent is issued.
The fee to register as a private landlord is £68 + £16 per property.
Late penalty fee is £137.
Page 193 of 274

Page 194

Total Total
Charge Charge Charge Charge
23/24 VAT 23/24 (Inc VAT) 24/25 VAT 24/25 (Inc VAT)
REGISTRATION FEES
Full or Abbreviated Extract:
Purchased within one month of registration £10 £0 £10 £10 £0 £10
Where the Registrar is given sight of a full or abbreviated extract £10 £0 £10 £10 £0 £10
Purchased more than one month after the date of registration £15 £0 £15 £15 £0 £15
Submission of marriage notice (per notice form) £45 £0 £45 £45 £0 £45
For solemnisation of civil marriage/ civil partnership £55 £0 £55 £55 £0 £55
£65 £0 £65 £65 £0 £65
£140 £0 £140 £140 £0 £140
Extra fee payable for weekday ceremonies (outwith normal office hours) £185 £0 £185 £210 £0 £210
Extra fee payable for weekend ceremonies £210 £0 £210 £235 £0 £235
Naming Ceremony £225 £0 £225 £250 £0 £250
Renewal of Vows £225 £0 £225 £250 £0 £250
Particular Search £5 £0 £5 £5 £0 £5
General Search £15 £0 £15 £15 £0 £15
Individual Citizenship Ceremony £80 £0 £80 £80 £0 £80
31: HUMAN RESOURCES CHARGES
Trade Union Commission - Subject to requirements of the Trade Union Bill
Arrestment Income:
Legislation allows the right on all employers to deduct a £1.00
administration fee from employees with salary arrestments
Payroll Service charge - This is inflated by RPI annually
Insurance Personal Accident
Insurance Illness
Consultancy:
This is dependent on requirements and the level of the work involved
10% of total payment per insurer 10% of total payment per insurer
21.12% of total payment to insurer21.12% of total payment to insurer
£100 per hour (Dependant on requirements)£100 per hour (Dependant on requirements)
2.5% of gross deduction 2.5% of gross deduction
£1 Per Employee £1 Per Employee
£1.68 per item on payslip per employee£1.63 per item on payslip per employee
Should the Register General decide to increase the statutory charges during 2024/25
a further report will be presented to the Finance & Resources Committee.
Extra fee payable for more than 8 people in the Tay Suite / Provost
Lounge (during office hours)
Extra fee payable for use of the Old Council Chambers / Civic Hall
(during office hours)
30: DEMOCRATIC SERVICES CHARGES
Page 194 of 274

Page 195

Budget Consultation Briefing – February 2024
1. Introduction 
This briefing gives a full overview of the public budget consultation undertaken to
inform the budget process for 2024/25. Between 8 December 2023 and 7 January
2024, we carried out an online consultation exercise to gauge residents’ views on
budget issues and priorities.
The feedback builds on the extensive online and in person consultation undertaken
in late 2022/early 2023 which informed the development and refinement of the
Council’s seven key priorities as set out in our Corporate Plan and the provisional
2024/25 and 2025/26 budgets set in March 2023.
We will continue to engage with our communities and people on an ongoing basis,
ensuring that feedback from this exercise is used to inform improvement activity
beyond the budget decision process, including more detailed investigation of the
issues and priorities raised here. Contributing to our commitment to work in
partnership with communities on common priorities and issues that affect and matter
to them. 
2. Budget consultation responses
Like all local authorities, the Council is preparing for very significant financial
challenges ahead as well as some difficult budget decisions.  Between 8 December
2023 and 7 January 2024, the budget questions were available on the Perth and
Kinross Council Consultation Hub to allow to gauge residents’ views and gather
feedback on budget issues and priorities.
Questions in the survey remained broadly similar to the previous year to allow for
comparison with a few improvements made following last year’s feedback. As in
previous years, introductory information was presented to improve our residents’
understanding of the challenges we currently face, where the Council gets its money
from and restrictions on the areas where we can make savings.  
Respondents were asked for feedback around what issues concern them personally,
preference for Council Tax setting for 2024/25, opinions regarding possibilities on
how we deliver services, priorities for investment for our capital budget and feedback
on how we work with our communities.  
An online campaign was launched to engage and inform the public and promote the
consultation. This included paid promotion of posts to reach a wider audience who
may not engage with Council content regularly, and a newsletter to all registered
subscribers to encourage participation.
Overall, there were 761 responses submitted to the on-line survey as a whole (1,092
in 2023/24 which included Corporate Plan consultation responses, 739 in 2022/23,
642 in 2021/22, 484 in 2020/21).
3
Page 195 of 274

Page 196

Page 2 of 15
As with any opt-in exercise of this type, results cannot be considered fully
representative of all Perth and Kinross residents but are indicative and influenced by
the demographic of participants. 96.19% of respondents live in Perth and Kinross
(95%, in 2023-24, 99% in 2022-23; 95% in 2021-22), and 24% of respondents study
or work locally (31% in 2023/24, 19% in 2022-23; 36% in 2021-22).
18.79% of responses stated that they are current employees of Perth & Kinross
Council (25% in 2023/24, 17% in 2022-23), 3.55% said they had been employed by
the Council in the last 3 years (4% in 2023-24, 2% in 2022-23). As in 2024-25,
3.15% said they would rather not submit this information (3% in 2023-24, 2% in
2022-23), and 75% of respondents declared that they were employed by Perth &
Kinross Council. 
Encouragingly the age distribution of respondents is more balanced when compared
to all-inclusive consultations such as this (see Figure 1). The profile of respondents
is broadly similar to previous years, although a slight increase of 2% in responses
from those aged under 24 years and a 2% increase from those aged 50-59 years are
of note (see Figure 1).
Figure 1: Breakdown of respondents by age 
Respondents were asked to provide their Electoral Ward (common settlements
within these were listed to make it easier for respondents). As shown in Figure 2,
most responses were received from Perth City South (similar to 2023-24 data
figures) and Perth City Centre wards, but all areas of Perth and Kinross are
represented within the responses. 
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
16-24 25-34 35-49 50-59 60-74 75+ Prefer not to
say
2024-25 2023-24 2022-23
Page 196 of 274

Page 197

Page 3 of 15 
Figure 2: Breakdown of respondents by Ward 
Results 
2.1 Setting the Council Budget – Issues of Most Importance for Individuals 
This question asked respondents to select the 5 most important issues facing
individual respondents personally. These issues did not need to be ranked in order
of importance. 
143
88
69 67 61 60
49 47 42 42 38
27 19 10
0
20
40
60
80
100
120
140
160
Page 197 of 274

Page 198

Page 4 of 15
Figure 3. Percentage of respondents indicating an issue as of most importance
personally (761 responses)
Cost of Living (most selected issue) and Educational Provision are the most
commonly selected issues this year by some considerable margin. This year Anti-
Social Behaviour ranked higher than Climate Change, but they remain popular for
2024-25. These 4 issues now surpass My Local Environment which has
maintained its position in the previous 2 years.
Leisure and Sport ranked 15 in 2023-24, is now the 6th most important priority,
followed by Public Transport which remains a top priority (ranked 7 in 2024-24,
ranked 6 in 2023-24).
My Child’s Future, Social Care, Housing Affordability, and Employment
Security, remain popular this year, reflecting the current economic climate and
overall social outlook.
While Culture maintains its ranking position when compared to 2023-24, a notable
increased proportion of respondents selected Physical Health and Future Job
Prospects compared to last year.
2.2 Change in Council Tax
Please note that this question had been set before the Council Tax freeze
announcement was made by the Scottish Government and it was not possible to
change the question without creating a difference between the experience of earlier
and later respondents.
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
1.8
2
Page 198 of 274

Page 199

Page 5 of 15
Respondents were asked what percentage change in Council Tax was preferable.
The options available were of 3.9% (as agreed in provisional budget for 2024/25 set
in March 2023) and 6% or 8%.
Figure 4:  Breakdown of preference on change in Council Tax (761
respondents) 
Overall, 75.3% of respondents opted for a 3.9% increase in Council Tax, 15.77%
opted for a 6% increase, and 6.44% opted for an 8% increase. 21 respondents
(2.76%) preferred not to answer this question. 
2.3 Changes in how services are delivered 
This year, respondents were asked for the given list of services/function which they
believe that the Council should consider:
• reducing standards of delivery, including frequency,
• maintaining current standards/investments,
• improving current standards/investments. 
As would be expected, those services for which most respondents specified for a
reduction in standard or frequency (Figure 5) broadly mirrored the results of our
2023-24 budget consultation. These were Council-run events, How you access
the Council, Adult learning, Repair and maintenance of Council-owned
buildings and Cultural activity. In turn, these were the least popular areas for
service maintenance (Figure 6) or improvement (Figure 7).
0%
10%
20%
30%
40%
50%
60%
70%
80%
3.9% Increase 6% Increase 8% Increase
Page 199 of 274

Page 200

Page 6 of 15
Figure 5. The Council reduces standard of service delivery, including
frequency or time taken to carry it out
Similar to the 2023-24 Budget consultation outcomes, Council-run events were by
far the most popular choice for service reduction and selected by 68 % of
respondents (67.4% in 2023-24). Additional comments from survey respondents also
highlighted events, with comments such as “should be charging for Council-run
events”.
How you access the Council, (e.g. availability of offices in your community,
customer contact centre by phone, email and webchat, etc.) (36% in 2024-25, 37 %
in 2023-24), Adult Learning (33% in 2024-25, 32% in 2023-24), Repair and
maintenance of Council-owned buildings (excluding Council housing) (28% in
2024-25, 30% in 2023-24) and Cultural activity (26%, in 2024-25, 28% in 2023-24),
remain the most popular choices for respondents indicating their preference for
reducing the standard of service delivery, including frequency or time taken to carry
it out.
0%
10%
20%
30%
40%
50%
60%
70%
80%
Page 200 of 274

Page 201

Page 7 of 15
Figure 6. The Council maintains current standards/ investment for this service.
Winter maintenance (55% in 2024-25, 56% in 2023-24), Household bin
collections (54% in 2024-25, 55% in 2023-24) and Road maintenance and Road
safety (53% in 2024-25, 57% in 2023-24) were the most frequently selected areas
for maintaining current levels of service (Figure 6).
Flooding (43% in 2024-25, 45% in 2023-24), Street Cleaning (42% in 2024-25),
Children’s and Families support services (42% in 2024-25), Social Care (39% in
2024-25, 41% in 2023-24), Parks and greenspace maintenance (38% in 2024-25,
36% in 2023-24) and Public transport (36% in 2024-25, 47% in 2023-24) were also
popular choices for maintaining .
Figure 7. The Council improves current standards/ investment for this service
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
Page 201 of 274

Page 202

Page 8 of 15
The most favoured areas for improvement in service standards/investment in 2024-
25 is Road Maintenance and road safety selected by over 40% of respondents
(33% in 2023-24) (See Figure 7), Social Care (32% in 2024-25, 43% in 2023-24),
Flooding (31% in 2024-25, 21% in 2023-24), Children’s and families support
services (29% in 2024-25, 40% in 2023-24) and Public Transport (25% in 2024-25,
29% in 2023-24).
The least selected areas for improvement broadly mirror the services selected to
have reduced standards of service delivery (see Figure 5). These are Council-run
events, How you access the Council, Bereavement Services and Planning and
Building Standards.
2.4 How Our Capital Budget is Spent
We asked what kind of projects we should invest our capital budget in. Respondents
were asked to select their three priorities for investment. These priorities did not
need to be ranked in order of importance.
Similar to results from 2023-24 Budget Consultation, Growth the local economy,
followed by the Learning estate and Opportunities for young people were given
the highest priority overall in 2024-25.
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
45.00%
Page 202 of 274

Page 203

Page 9 of 15
Figure 8. When considering the kinds of projects to invest in, please choose
three of the following as your priorities for investment1  
2.5 How We Work With Communities
We asked about to what extent our respondents agree/disagree that individuals and
communities can develop and delivery local solutions to local needs without relying
on the Council to provide services as may have been the case in the past. There
was good agreement (>70%) that the Council should encourage/support
communities to deliver certain services and also help people to help themselves to
reduce reliance on public services.
Figure 9. Perth & Kinross Council should encourage and support local people
and communities to deliver certain services (761 responses). 
1 Scoring generated by survey system based on all responses received
0
0.2
0.4
0.6
0.8
1
1.2
1.4
To support
growth of the
local economy
To improve or
grow our
school learning
estate
To create
opportunities
for young
people
To provide
access to
services in
rural areas
To improve
active travel
networks and
safety for non-
drivers
To support
climate change
targets
To create
opportunities
for business
Page 203 of 274

Page 204

Page 10 of 15 
Figure 10. Perth & Kinross Council should help people to help themselves
more so they have less reliance on publicly funded services (761 responses) 
3. Additional Comments 
When asked to share ideas that could help the Council save money or generate
additional revenue 571 (52%) people chose to leave a comment (compared with
44% in 2022/23 Budget Consultation and 41% in previous year).  Many respondents
offered multiple suggestions and comments cover a wide variety of themes. 
0
50
100
150
200
250
300
350
Strongly agree Agree Neither agree nor
disagree
Disagree Strongly disagree
0
50
100
150
200
250
300
350
Strongly agree Agree Neither agree nor
disagree
Disagree Strongly disagree
Page 204 of 274

Page 205

Page 11 of 15 
3.1 Workforce
When respondents commented on council’s workforce this was either as stand-alone
comments or in relation to other areas of concerns to them such as the standards of
various service delivery and the council’s budget. In general respondents were
concerned with staff and management productivity/efficiency, work duplication,
middle management, pay/expenses benefits, cohesion between services and
access to Council staff are areas that the respondents suggest as in need of
review.
3.2 Service delivery
When suggesting services as a budget saving potential, the comments were
categorised under the following themes: Service standards (maintain, reduce,
stop), new alternative approach to how some services are delivered,
outsourcing/privatising, community/3rd sector delivery, focus on
priorities/outcomes, invest, partnership working (other local authorities),
consolidate/efficiency. 
In general, when discussing different services respondent indicate that the Council
should move away from organising events and entertainment (such as the Christmas
Lights Party), and instead focus on the priorities laid out In the Corporate Plan
(examples mention investing in youth, supporting families with additional needs and
education, and invest in better social care provisions).
3.3 Local economy
In this category, comments largely focused on parking, local businesses,
organised events/attractions (e.g., Christmas Lights Party, Perth Museum),
partnership working, ambition (focus on the ambitions set in the Corporate Plan),
public transport/active travel, flagship (referred to by some respondents as
‘vanity’ projects). 
Respondents take pride in being Perth and Kinross residents and they believe it is
important that the Council and residents set out a “vision of what Perth wants to be”
for the local economy to improve. This places the focus of most of the comments,
and suggestions residents offer to improve local economy and suggestion towards
making Perth an attractive city for both tourists and residents.
Respondents also asked for an increased focus on (all natural) attractions in
Perthshire, which in their opinion would bring visitor and economics benefits in Perth
throughout the year. 
Page 205 of 274

Page 206

Page 12 of 15
3.4 Assets
In this category additional comments referred to leasing/renting assets; looking
after/using what we have/avoid new (assets); sell/get rid
of/downsize/consolidate; energy efficiency.
A great number of answers suggested that the Council should focus on increasing
the energy efficiency of their building stock, either by adopting green energy
measures (for new and old buildings) or by better managing energy spend.
3.5 Charges and income generation
In relation to the Council Tax charge the opinions of respondents are split between
reducing and increasing Council Tax. Those suggesting an increase suggest this
should be applied to “second homes”, “larger properties”, and “holiday lets”.
Respondents who referred to fee increases, particularly mentioned increased
parking charges and fines, as long as the number of parking spaces particularly
within the city centre are also increased.
A large number of respondents suggest that “the Council need to focus the
generation of income not the removal of services. Offer premium services at an
additional cost. For example, want a private grit bin on your street, then pay for it.”
3.6 Business processes
Respondents asked for increased focus on technology and digitalisation as a way
to increase efficiency and better manage all council operation whilst also reducing
waste. Respondents would also like to see what the council is doing to reduce
bureaucracy and increase efficiency through the council.
4. Social Media 
This year’s budget consultation generated more engagement on social media when
compared to the Budget Consultation which took place in 2022/23, but fewer clicks
through to the survey page. We are reviewing the content approach taken this year
to consider the impact this may have had on the reduced call to action. Although it is
worth noting that the much higher click through rate last year was not representative
of participation in the survey, with more than half of the clicks from social media to
the consultation hub not resulting in participation in the survey.
We trialled paid boosting of posts on Facebook for the first time (for budget
consultations, we have used this previously for other campaigns) to increase the
reach to people who may not otherwise engage with the Council’s content, which
appears to have been successful, albeit that it did not carry through to participation.
This promotion cost £70.
Page 206 of 274

Page 207

Page 13 of 15
In response to Facebook promotion there were 141 comments, 209 reactions, 70
shares, and 601 clicks of the link to the budget consultation survey web page for
more information. (The Budget Consultation in 2022/23 generated 48 comments,
284 reactions, 45 shares, and 2,444 clicks to the web page.)   
Promotion on X (formerly Twitter) generated 2 comments, 4 reactions, 7 retweets
and 129 clicks to the survey webpage (the Budget Consultation 2022/23 generated 5
comments, 23 reactions, 11 retweets and 0 clicks to the survey). 
5. Lessons learned for future consultation
This year respondents were also asked to evaluate the consultation and indicate if
the consultation allowed them to have their say. As shown in Figure 11, almost 40%
of respondents indicated that they have found the consultation clear/easy to
understand, and 40% of respondents found the consultation to be interesting, 46% of
respondents indicated that the consultation allowed them to have their say and 33%
were overall satisfied with the consultation. 
Figure 11 To what extent do you agree/disagree with the following statements
about this consultation: 
Q1 Evaluation - It was clear/easy to understand. 
Q2 Evaluation - It was interesting. 
0 100 200 300 400
Strongly disagree
Disagree
Neither agree nor disagree
Agree
Strongly agree
Not Answered
0 50 100 150 200 250 300 350
Strongly disagree
Disagree
Neither agree nor disagree
Agree
Strongly agree
Not Answered
Page 207 of 274

Page 208

Page 14 of 15
Q3 Evaluation - It allowed me to have my say 
Overall, how satisfied/dissatisfied were you with this consultation 
197 respondents added additional comments to help with the evaluation and
improvement of future Budget Consultations. The most common themes from the
detailed evaluative feedback about this consultation are as follows:
• Greater accessibility: clearer presentation and wording of questions (e.g., less
formal language), balanced options for answers, along with examples or
details related to budgeting questions, visual aids or graphs to aid “for those
less familiar with the public sector space and for those who aren't familiar with
the consultation process”, and suggestions to include a “budget model” for
citizens who are not familiar to 
• Improved structure and layout of the consultation 
• Engage with wider demographic. 
• More extensive promotion of the consultation 
• Explanation definitions and terms where necessary 
• Clarity on how and if the feedback will be used along with a request for
feedback on results – you said, we did type of exercise (include/consider past
suggestions)
• Feedback on how, if and where the results of the consultation will be made
available. 
0 100 200 300 400
Strongly disagree
Disagree
Neither agree nor disagree
Agree
Strongly agree
Not Answered
0 50 100 150 200 250 300
Strongly disagree
Disagree
Neither agree nor disagree
Agree
Strongly agree
Not Answered
Page 208 of 274

Page 209

Page 15 of 15
6. Conclusion 
Our budget consultation has provided us with feedback on priorities and themes that
are important to people in Perth and Kinross. It has also provided further suggestions
which can be used to inform our budget process as well as in wider engagement
exercises. Continuous engagement and discussion are key to its success, and we
are looking forward to continuing building trust and productive relationships. We will
continue to build on our methods to involve communities who are seldom heard,
benchmarking with our Community Planning Partners and local community groups to
ensure that we understand the issues important to them. 
Page 209 of 274

Page 210

Page 210 of 274

Page 211

Appendix F
Summary of Council Cash Backed Reserves 31 March 2023 and projected 31
March 2024
The 2022/23 Annual Accounts which were presented to the Audit Committee on 11
December 2023 (Report No. 23/237 refers), give an overview of the Reserves
position as at 31 March 2023 which is summarised in the table below.  A projection
of balances to be held 31 March 2024 is also shown. 
Summary of Council Reserves as at 31 March
2023 and March 2024   
2023/24
(Projected) 
£’000 
2022/23
(Audited)
£’000
General Fund    47,042 69,723
Housing Revenue Account      2,200  2,647
Capital Fund 31,486 26,343
Insurance Fund 713 1,306
Capital Receipts Reserve 616 2.245
Capital Grants Unapplied 87     87   
82,144 102,351   
The above summary excludes the 
• Revaluation Reserve; 
• Capital Adjustments Account; 
• Financial Instruments Adjustment Account; 
• Pensions Reserve, and 
• Employee Statutory Adjustment Account.   
These Reserves reflect proper accounting practice, but are not resource-backed and
are, therefore, of limited relevance in determining the Council’s Reserves and budget
strategies.
3
Page 211 of 274

Page 212

Page 212 of 274

Page 213

APPENDIX G
£'000 £'000
Balance on General Fund at 1 April 2023 (Appendix 1) 69,723
Budgeted Contributions to/(from) Balances (Approved March
2023) (9,905)
Approved Contributions to/(from) Balances since March 2023 (14,260)
Revenue Monitoring - Report 3
Service 341
Corporate (1,398)
(1,057)
Year End  Adjustments:
Devolved School Management: Projected Under spend 239
Revenue Grants - PEF Funding 100
Developer Contributions: Commuted Sums Net Income 654
Salix (13)
School Estate 561
Anticipated Funding 1,500
Winter maintenance (500)
2,541
Projected Balance on General Fund at 31 March 2024 47,042
Projected General Fund Balance at 31 March 2024 (excl HRA)
3
Page 213 of 274

Page 214

Page 214 of 274

Page 215

Appendix H 
Summary of Earmarked Reserves at 31 March 2024
Transformation and Workforce Management - £6.952 million  
The Council has resources earmarked to enable the Transformation & Change
Strategy and workforce management in future years. 
Revenue Grants - £6.292 million
These grants are being carried forward in Reserves in accordance with proper
accounting practice as the grant conditions have been met but the relevant
expenditure has not yet been fully incurred.  It is possible that further grants will be
received in advance of the financial year end, which will augment the projected
earmarked Reserve.   
Developer Contributions: Commuted Sums & Infrastructure and Affordable
Housing - £6.194 million
The Enterprise & Infrastructure Committee approved supplementary guidance on 3
September 2014 for developer contributions covering community greenspace,
primary education, Auchterarder A9 junction improvements, affordable housing and
transport infrastructure (Report No. 14/370 refers). 
Developer Contributions are held in the Council’s earmarked Reserves until they are
applied to relevant schemes.  It is projected that approximately £1.561 million of
unapplied resources in relation to affordable housing will be held by the Council at 31
March 2024 and it is proposed to earmark the unapplied amount within General
Fund Balances. 
Additionally, it is proposed to earmark accumulated balances of £2.597 million for
the provision of education infrastructure and £767,000 for transport infrastructure. 
Contributions are also provided by developers towards the cost of maintaining areas
of ground. These contributions are used to fund relevant expenditure over a ten-year
period.   
It is projected that approximately £1.269 million of unapplied resources for tree
planting, play areas, community allotments and sports grounds will be held by the
Council at 31 March 2024. 
In summary it is proposed to earmark the unapplied amount of developer
contributions and commuted sums within General Fund Balances as follows: 
3
Page 215 of 274

Page 216

£m
Affordable Housing 1.561
Education Infrastructure 2.597
Transport Infrastructure 0.767
Environmental Infrastructure 1.269
TOTAL 6.194 
Affordable Housing (Resources accrued from reduced Council Tax Discounts)
- £4.241 million
It is anticipated that by the end of the current financial year, there will be a balance of
approximately £4.241 million in earmarked Reserves which has been generated
because of the Council’s policy of varying the level of Council Tax charged for long
term empty properties and second homes.  There are projected commitments
against this reserve of £440,000 in 2024/25. 
School Estate - £1.900 million
These resources include amounts previously approved by the Council for the primary
and secondary school estate including maintenance works and resources for new
schools.
Anti-Poverty Measures - £1.847 million
The Council approved the creation of a COVID-19 Reserve on 27 January 2021
(Report 21/8 refers) to assist with addressing the ongoing impact of Covid-19 in
future years.  This has now been redirected towards Anti-Poverty measures.  The
balance at the start of 2023/24 was £2.666 million. 
Car Parking - £1.512 million
The Car Parking balance at 31 March 2024 is projected to be at a similar level as the
previous year.  This surplus is restricted in its application under the Road Traffic
Regulation Act 1984 and any proposals to utilise these resources will require to be
approved by the Finance & Resources Committee.   
Culture - £1.081 million
There is £1.081 million earmarked for developing the cultural offer originally
approved from an under spend in the 2018/19 Revenue Budget and transferred to a
Cultural Reserve as part of 2018/19 Revenue Monitoring Report 2 to the Strategic
Policy & Resources Committee on 28 November 2018 (Report No. 18/384 refers). 
This has been increased in future years by further underspends from the culture
budget. 
Page 216 of 274

Page 217

Non-Recurring Revenue Budget Proposals - £0.703 million
The 2024/25 Provisional Revenue Budget includes non-recurring expenditure
proposals of £0.703 million which are funded by the Council’s earmarked reserves
and have been approved during the year at the Finance & Resources Committee. 
Modern Apprentices / Graduate Trainees - £340,000
The Strategic Policy and Resources Committee originally approved the transfer of
£150,000 during 2014/15 to fund future expenditure on modern apprentices and
graduate trainees.  The projected balance remaining at 31 March 2024 is £340,000
which includes current and previous year underspends. 
School Counsellors - £329,000 
Revenue Budget 2020/21 Update No 2 to the Strategic Policy & Resources
Committee on 25 November 2020 (Report No. 20/225 refers) approved the
earmarking of resources received from the Scottish Government in respect of
counselling in schools which were not anticipated to be spent in 2020/21 due to
school closure during the lockdown period.  These resources will be applied in
2024/25 and 2025/26 following the awarding of a three-year contract. 
Children and Young People’s Residential Care - £281,000 
These resources were earmarked to be utilised in the provision of children’s social
work services over 2 financial years in managing the impact of Covid-19 on higher
levels of needs and reduce the number of residential placements.  The balance of
these resources will be utilised in 2024/25. 
Property Maintenance - £262,000
Revenue Budget Report 2021/22 No 3 to the Strategic Policy & Resources
Committee on 24 November 2021 approved the earmarking of resources of
£250,000 in respect of property maintenance to be utilised in future years.  This was
increased by a further £55,000 in 2021/22. 
Devolved School Management (DSM) - £239,000
The earmarked amount shown above is an estimate of the accumulated sum
available to be carried forward at 31 March 2024 under the approved scheme for
managing these budgets.  The purposes for which the earmarked amount can be
used and the procedures for its management and control are detailed in the
Council’s approved DSM scheme (Report No. 15/507 refers). 
Works Maintenance - £200,000
It is proposed that the Council continues to earmark the balance of £200,000 for
future works maintenance which remains from the £1.25 million approved as part of
the 2018/19 – 2020/21 Revenue Budget. 
Page 217 of 274

Page 218

Community Resilience - £175,000 
These resources were earmarked during 2023/24 at the Finance & Resources
Committee for future weather events. 
Salix - £100,000
Salix Finance Ltd is a Government owned non-departmental public body which
provides interest free loan funding for energy efficiency works. The loan is re-paid to
the fund over a number of years and re-invested in future energy efficiency works. 
It is projected that the balance on the Fund at 31 March 2024 will be approximately
£100,000 and this amount is shown as being earmarked within General Fund
Reserves. 
PH2O (Perth Leisure Vision) - £62,000
The Strategic Policy & Resources Committee approved the transfer of £350,000
from a budget of £500,000 as part of 2019/20 Revenue Monitoring Report 3 to fund
the future design and business operating model of the PH2O project (Report No
20/22 refers).  The remaining balance of £62,000 will be utilised in future years on
this project. 
Local Action Partnerships - £60,000 
The amount shown is earmarked for Local Action Partnerships and is the balance of
resources which were approved in 2017/18 Revenue Monitoring Report 3 by the
Strategic Policy & Resources Committee (Report No.18/41 refers).  These resources
are approved for payment to groups via application to one of the seven local action
partnerships. 
Local Government Elections - £53,000 
These resources are earmarked in reserves as a contribution to local elections. 
Community Investment Fund - £38,000
It is proposed that the Council continues to earmark the remaining balance of
£38,000 of the Community Investment Fund approved as part of the 2018/19 –
2020/21 Revenue Budget. 
Ventilation Measures £24,000 
These resources are earmarked for ventilation measurers to be finalised in 2024/25. 
Financial Assistance - £20,000 
There is a recurring annual contribution from reserves to fund any future Mods and
other events across Perth and Kinross.
Page 218 of 274

Page 219

APPENDIX I
£'000 £'000
Projected General Fund Balance at 1 April 2024 47,042
Financial Year 2024/25
Additions to Balances during year 1,639
Use of Balances (5,585)
(3,946)
Projected General Fund Balance at 31 March 2025 43,096
Financial Year 2025/26
Additions to Balances during year 1,639
Use of Balances (1,247)
392
Projected General Fund Balance at 31 March 2026 43,488
Financial Year 2026/27
Additions to Balances during year 1,947
Use of Balances (1,017)
930
Projected General Fund Balance at 31 March 2027 44,418
Summary of the Projected Use of General Fund Revenue Balances 
2024/25 ,2025/26 and 2026/27
The following table only takes account of the use of Reserves where there are
known commitments over the next three years.  Where the timing of expenditure is
unknown budgets will be updated as appropriate.
3
Page 219 of 274

Page 220

Page 220 of 274

Page 221

PERTH & KINROSS COUNCIL 
28 FEBRUARY 2024 
REPORT NO: 24/64 
STRATEGIC INVESTMENT & CAPITAL BUDGET 2024/25 – 2029/30 
Report by the Head of Finance
(Report No. 24/64) 
1. PURPOSE 
1.1 This report provides an update on the Composite (General Fund) Capital Budget.
The recommendations within the report are informed by the recently approved
Corporate Asset Management Framework (Report 24/18 refers), the
Transformation Review of Leisure Assets (Report 24/19 refers) and the Review
of the Council’s Learning Estate (Report 20/20 refers) together with other
ongoing work on the Council’s infrastructure and assets. 
1.2 The report updates members on the Council’s provisional 2024/25 Scottish
Government Capital Grant funding; recommends that the Council approve an
updated 6 Year Capital Delivery Programme for the period 2024/25- 2029/30 and
sets out officer recommendations on specific Capital Projects and Programmes
of works.   
1.3 Investment in the Council’s assets and infrastructure involves the long-term
commitment of Revenue Budget resources to meet Capital financing costs. The
Council has a duty to ensure that its financial position remains sustainable and
can evidence best value in the use of public funds. The report provides members
with an updated assessment of the overall affordability of the Composite
(General Fund) Capital Budget. The report also outlines the risks and challenges
surrounding the Council’s Capital Budget and makes recommendations on the
Capital Funding Strategy underlying current and future investment and
disinvestment decisions.
2. RECOMMENDATIONS 
2.1 The Council is requested to: 
a) note the contents of the report. 
b) approve setting a 6 Year Capital Delivery Programme for the period
2024/25 – 2029/30 based on updating the current General Fund Capital
Budget attached at Appendix 1 to the report (paragraph 8.7 refers). 
c) approve budget provision of £33.469 million in 2028/29 and £30.438 million
in 2029/30 for Capital Programmes as presented in section 9 and table 4 in
the report (paragraph 9.9 refers). 
4
Page 221 of 274

Page 222

d) approve budget provision of £3.370 million in both 2028/29 and 2029/30 for
the Prudential Borrowing Programmes (paragraph 9.11 refers). 
e) approve budget provision of £13.2 million for the Bertha Park Link Road as
presented in section 10.3 and Appendix 2 to the report (paragraph 10.3.8
refers). 
f) approve budget provision of £4.317 million to reflect the revised cost
estimates for Flood Schemes as presented in section 10.4 and table 5 in
the report (paragraph 10.4.4 refers). 
g) approve budget provision of £6.330 million for IT licensing and
infrastructure as presented in section 10.5 and Appendix 3 to the report
(paragraph 10.5.4 refers). 
h) approve budget provision of £3 million for a replacement Waste Transfer
Station at the Friarton Depot site as presented in section 10.6 of the report
(paragraph 10.6.3 refers). 
i) approve budget provision of £1.158 million for the MOSAIC system as
presented in section 10.7 of the report (paragraph 10.7.3 refers). 
j) approve budget provision of £0.4 million for traffic signal renewal as
presented in section 10.8 of the report (paragraph 10.8.4 refers). 
k) remit officers with providing a progress report on Perth West to the Finance
& Resources Committee on 12 June 2024 to confirm funding to deliver the
next stage of the project (paragraph 11.7 refers). 
l) note the funding assumptions and the financial modelling supporting
recommendations within the Provisional Revenue Budget on the Capital
Funding Strategy (section 12 of the report refers). 
3. STRUCTURE OF THE REPORT 
The structure of this report is set out as follows: 
• Section 4 - Corporate Asset Management Framework
• Section 5 -Transformation Review of Leisure Assets
• Section 6 - Review of Learning Estate
• Section 7 - Scottish Government Capital Grant Funding in 2024/25
• Section 8 - Review of the General Fund Capital Budget 
• Section 9 - Recommendations on Capital Programme Expenditure 
• Section 10 - Recommendations on Capital Project Expenditure
• Section 11 - Perth West
• Section 12 - Capital Funding Strategy & Affordability
• Section 13 – Risk Assessment  
• Section 14 - Summary 
Page 222 of 274

Page 223

4. CORPORATE ASSET MANAGEMENT FRAMEWORK 
4.1 The Corporate Plan approved by Council in December 2022, sets our vision for
“a Perth and Kinross where everyone can live life well, free from poverty
and inequality”. The achievement of this vision is supported by 7 key strategic
priorities which set the direction for Council policy, the focus of service delivery
and the allocation of the Council’s available resources. These are listed below: 
• Working in partnership with communities, 
• Tackling poverty, 
• Tackling climate change and supporting sustainable places, 
• Developing a resilient, stronger and greener local economy, Developing a
resilient, stronger, and greener local economy, 
• Enabling our children and young people to achieve their full potential, 
• Protecting and caring for our most vulnerable people,
• Supporting and promoting physical and mental wellbeing. 
4.2 The Council has adopted a Strategic Capital Investment Planning Framework
based upon the 5-case model applied by the UK Treasury. The Framework
comprises both an unfunded 30-Year Investment Blueprint to inform the
Council’s long term strategic investment and a 6 Year Funded Capital Delivery
Programme to meet more immediate investment needs (Report 21/180 refers).
4.3 The Council approved a 5 Year Capital Delivery Programme 2023/24-2027/28 at
the Council meeting on 1 March 2023 (Report 23/73 refers). This was intended
as an interim position pending the reversion to a 6 Year Funded Delivery
Programme. In setting the budget last March, Council remitted officers with the
development of a new Corporate Asset Management Plan and the development
of a long-term investment plan and funding strategy to inform future Capital
investment decisions.
4.4 In January 2024, Council approved the Corporate Asset Management
Framework (Report 24/18 refers). This comprises an overarching Corporate
Asset Management Policy and Strategy which describes the corporate approach
to the management of assets to deliver the Council’s strategic priorities. This is
supported by 5 stream asset management plans covering: 
• Community Greenspace
• Fleet
• ICT
• Property
• Roads
The asset plans describe how individual asset streams adhere to the corporate
policy and provide an assessment of the 30-year investment requirement for
each asset stream based upon life cycle planning for the existing asset base and
existing levels of service. The asset plans are intended to be iterative documents
Page 223 of 274

Page 224

and will be updated on an annual basis to incorporate additional investment and
disinvestment decisions.
4.5  Asset management strategy and planning for the Council’s social housing stock
is undertaken through the separate Strategic Housing Investment Programme
(SHIP) which is developed in consultation with Council tenants and funded
through the Housing Revenue Account.
4.6 The approved Corporate Asset Management Framework is based upon the
following principles:
• we maximise the public value of our physical assets.
• we only have / keep and invest in the physical assets that we need to
support effective service delivery.
• our approach to asset management helps mitigate the impact of climate
change.
• our approach to asset management helps promote inclusive economic
growth.
• our approach to asset management planning helps promote equality and
fairness through service design and delivery.
• our approach to asset management helps promote and enhance digital
inclusion.
4.7 A key component of the Framework is the introduction of the Asset Challenge.
This challenge provides a measurable and comparable overview across all asset
streams giving an evidence base to support more informed and risk aware
investment decision making. Any proposed investment or disinvestment will be
subject to this challenge.
4.8 The Council has also recently approved the establishment of a Strategic
Investment Advisory Group (SIAG) comprising elected members and officers to
provide political and strategic direction to and oversight of the Council’s
investment planning in line with our vision and priorities. The SIAG will work on
an ongoing basis to consider the impact of legislative changes, nation policy
direction, future developments, and emerging opportunities on the Council’s
strategic investment planning. This will include considering investment
requirements alongside other public sector delivery partners. 
4.9 While elected members are asked to approve setting a 6 Year Capital Delivery
Programme at this meeting of Council, the consideration of Capital investment
need and the development of affordable; deliverable and sustainable responses
to this need is an ongoing and evolving process. Through the work of the SIAG
and consideration of Finance & Resources Committee and Council reports.
elected members will shape, scrutinize, and determine Capital investment
throughout the course of the financial year. This includes the forthcoming reports
on PH2O, and Perth West referenced below. 
4.10 While elected members are asked to approve setting a 6 Year Capital Delivery
Programme at this meeting of Council, the consideration of Capital investment
need and the development of affordable; deliverable and sustainable responses
to this need is an ongoing and evolving process. Through the work of the SIAG
and consideration of Finance & Resources Committee and Council reports.
Page 224 of 274

Page 225

elected members will shape, scrutinize, and determine Capital investment
throughout the course of the financial year. This includes the forthcoming reports
on PH2O, and Perth West referenced below. 
4.11 The critical importance for service delivery of the Council’s assets and
infrastructure is reflected within the 5 stream asset management plans. The
asset plans also highlight the long-term financial challenge presented through
investing in and operating these assets. Detailed information on each asset
stream is set out within the Corporate Asset Management Framework (Report
24/18 refers) with an overview provided in the table below: 
Table 1: Corporate Asset Management Overview & Projected Investment
Requirement (2030/31-2053/54)  
Asset Stream Current Asset Base Net Book
Valuation at 
31/3/2023** 
Projected investment
requirement over 24
Years 2030/31-
2053/54 based on
lifecycle planning.
(Period beyond 6 Year
Delivery Programme) 
Community Greenspace 1,614 greenspace sites £7.6 million £99 million
Fleet 2,380 items of fleet &
mechanical Equipment
£22.2 million £72 million
Information and
Communication
Technology (ICT)
23,025 items of
hardware and all
corporate software
£12.1 million £167 million
Property  968 sites within the
property estate
£702 million £1,759 million
Roads 1,546 miles of
carriageway and related
infrastructure
£3,660 million £497 million
Total   £2,594 million 
** Valuations are based on the accounting policies used in preparing the Council’s audited financial
statements and do fully reflect the current replacement cost of the Council’s assets. 
4.12  The Corporate Asset Management Plan and Strategy underlines the importance
of the Council committing a significant element of its available Capital resources
on a recurring basis towards investment in our existing assets and infrastructure.
The recommendations within the report recognise and prioritise investment in the
Council’s existing asset base. 
4.13 This approach supports the Asset Management Framework principles of
maximising the public value of our physical assets; only investing in physical
assets that we need to support effective service delivery and mitigating the
impact of climate change. It is also consistent with the Scottish Government’s
Investment Hierarchy of maximising the useful life of existing assets. 
Page 225 of 274

Page 226

4.14 The Framework and Asset Challenge methodology provides a more robust basis
in future for evidence led investment decisions. This evidence base will support
the work of the Strategic Investment Advisory Group which will provide political
oversight and input at an early stage in the development of investment
proposals. 
4.15 An evidence based and led assessment of investment need will also prove
critical as the significant cost of maintaining the Council’s asset base will require
managed disinvestment to form an integral part of an affordable and sustainable
Capital Budget strategy. 
4.16 Investment in the Council’s existing assets and infrastructure is reflected with the
Capital Programmes of Works. Officer recommendations on the Council’s Capital
Programmes are set out below in Section 9 of the report. 
5. TRANSFORMATION REVIEW OF LEISURE ASSETS 
5.1 In February 2022, Council approved the allocation of £90 million towards the
delivery of a combined water, ice, and group fitness facility - the PH2O project-
on the site of the current Perth Leisure Pool and Dewar’s Centre (Report 22/36
refers). This was supported by an adjustment to the Council’s Capital Funding
Strategy linked to the ring-fencing of income from growth in the Council Tax
base. 
5.2 At the Council meeting on 1 March 2023, members were provided with a revised
cost estimate for PH2O of £110 million reflecting both the scale and complexity
of the proposed facility. At that time, Council approved pausing the development
and delivery of the PH2O project on the grounds of overall Capital Programme
affordability with the existing budget provision for the project of £90 million being
retained pending the outcome of the Review of Leisure Assets (Report 23/73
refers).
5.3 On 22 January 2024, Council considered the Transformation Review of Leisure
Assets (Report 24/19 refers). The scope of the review encompassed all current
leisure assets owned by the Council or our arms-length delivery partner Live
Active Leisure (LAL). The purpose was to review current leisure facilities
operated by Live Active Leisure to ensure they align with future service needs
and make best use of resources.   
5.4 The Review considered the current usage of leisure facilities and future forecast
demand; their accessibility for the population of Perth & Kinross, operating costs
and subsidy levels per usage and estimated capital expenditure required by
venue including investment in energy efficiency measures.  
Page 226 of 274

Page 227

5.5  Council agreed to an amendment to the recommendations within the report.
Subject to formal approval of the Council Minutes, officers have been remitted to: 
• Bring back to Council in August 2024 options for the consolidation of leisure
provision in Perth City on one site including “an ice rink component and a
design for a new swimming pool which will allow a family friendly leisure
swim offering alongside fitness and lesson swims.”
• A costed Transition Plan for the next 3-5 years
• Proceed with energy efficiency measures for Live Active Loch Leven and
Strathearn campuses and prepare a business case for upgrading facilities
at these locations.
• Consolidate all booking and payment systems for leisure facilities operated
by LAL and in secondary schools.
• (in respect of Community Halls), consider the creation of a Capital fund
budget to facilitate Community Asset Transfer. 
5.6 In accordance with the previous decision of Council in March 2023, the report
has been prepared based on £90 million being provisionally allocated within the
Capital Funding Strategy for the delivery of the Review of Leisure Assets. 
5.7 The full funding requirement for a new consolidated leisure facility in Perth will be
subject to Council consideration pending further work by officers, as instructed,
to investigate options for retaining ice facilities, with further advice to Council due
in August 2024.   
5.8 Members are advised that there is no budget provision currently allocated for the
Community Asset Transfer of Halls. This carries a risk that the Council is unable
to deliver the property rationalisation approved in both the Review of Leisure
Assets and the Transformation Reviews of the Council’s Arm’s Length External
Organisations (ALEOs). Officers are continuing to progress both of these
workstreams as well as the transformation workstream in relation to community
engagement. From this, recommendations will be made to the Strategic
Investment Advisory Group (SIAG).S, reIAG) udget provision to support asset
transfer and will require to be considered in the future determination of the
Capital Budget. 
5.9 Members are also advised that there is currently no identified budget provision to
meet the Council’s obligations under the lease for Perth Concert Hall. The
Concert Hall is over 20 years old, and a programme of upgrade and compliance
works has been identified for the facility. Budget provision to undertake these
works will require to be considered in the future determination of the Capital
Budget to allow the works to be scheduled around the Concert Hall’s programme
of events. 
Page 227 of 274

Page 228

6. REVIEW OF THE LEARNING ESTATE 
6.1 On 22 January 2024, Council considered a report on the Learning Estate (Report
24/20 refers). The report provided an update on the work undertaken to review
the Council’s Learning Estate with the following recommendations being
approved: 
• No further action following the outcome of the feasibility of introducing Early
Learning and Childcare provision in all rural primary schools currently
without one as there are no solutions that would help to generate a
sustainable school roll.
• No further action following the outcome of work undertaken on catchment
analysis that seeks to utilise available capacity in low occupancy primary
schools as there are no solutions that would help to generate a sustainable
school roll.
• Instruct the Director, Strategy, People & Resources to commence
community engagement to seek the views of stakeholders and communities
regarding the vision and future of the secondary learning estate in Perth
City.
• Notes that a review is underway relating to the timing of a new primary
school at Bertha Park. 
6.2 Following the report to Council, on 31 January 2024 the Finance & Resources
Committee approved the re-phasing of the budget for the new school at Bertha
Park by two years from 2026 until 2028. The figures considered within the review
are based upon the current forecast for house completions at the Bertha Park
development (Report 24/41 refers) and support the re-phasing with the situation
being kept under review. 
6.3 In accordance with the prior decisions of Council and the Finance & Resources
Committee, the report has been prepared based on maintaining the current level
of budgeted investment in the Council’s Learning Estate. 
6.4 Further investment need identified in respect of the Council’s secondary learning
estate in Perth City, will be subject to a future decision of Council following
consideration of the outcome of community engagement and statutory
consultation.   
7. SCOTTISH GOVERNMENT CAPITAL GRANT FUNDING IN 2024/25 
7.1 Finance Circular No 8/2023 issued on 21 December 2023, advised local
authorities of their provisional Scottish Government Revenue and Capital funding
allocations. The local government settlement provides for Capital Grant funding
for local authorities of £638.009m in 2024/25, of which £516.837 million is
General Capital Grant funding and £121.172 million is Specific Capital Grants. 
7.2 General Capital Grant is provided in support of local authority determined Capital
expenditure together with £33.6 million allocated to support Scottish Government
Page 228 of 274

Page 229

approved priority Flood Schemes. The Specific Capital Grant funding of
£121.172 million in 2024/25 comprises £5 million for approved vacant & derelict
land schemes; £92.245 million for the Affordable Housing Supply Programme
and £23.927 million for projects funded through the Scottish Government
Cycling, Walking & Safer Streets programme. 
7.3 The COSLA Budget Reality statement issued on 21 December 2023 identified a
cash cut of £54.9 million in comparing the Capital Grant in the provisional
2024/25 settlement to equivalent Capital Grant funding in the final 2023/24
settlement. 
7.4 The Council’s General Capital Grant for 2024/25 (excluding Flood Schemes) is
£1.179 million lower than originally estimated in line with the national position. 
7.5 The Council’s Grant funding for priority Flood Schemes has, however, been
uplifted by £11.410 million in 2024/25 (and a further £5.858 million in later years)
based upon the latest cost estimates for the schemes concerned. Together with
additional Specific Capital Grant funding for Cycling, Walking & Safer Streets
projects, the net movement in the Council’s provisional 2024/25 Capital Grant
funding is £10.695 million as set out in the table below: 
Table 2: 2024/25 Perth & Kinross Council Provisional Scottish Government
Capital Grant Funding   
Original
Estimate 
£’000
Finance
Circular
8/2023
£’000
Movement 
£’000    
General Capital Grant 
(excluding Flood Schemes)
13,130 11,951 -1,179    
Flood Schemes (80% Revised Estimate) 1,680 13,090 11,410    
Specific Capital Grant 
(Cycling, Walking & Safer Streets) 
200 664 464
Less: Capital Grant applied in Revenue
Budget
-1,600 -1,600 0    
Total 2024/25 Provisional Capital Grant 13,410 24,105 10,695 
Page 229 of 274

Page 230

8 REVIEW OF THE GENERAL FUND CAPITAL BUDGET 
8.1 Officers have undertaken a review of the current approved General Fund Capital
Budget 2023/24 – 2027/28, attached at Appendix 1 to the report, as the starting
point for the development of recommendations on the forward 6 Year Capital
Delivery Plan. 
8.2 As reported to the Finance & Resources Committee on 31 January 2024,
expenditure on the General Fund Capital Budget over the period 2023/24-
2027/28 is currently estimated at approximately £623.9 million (Report 24/41
refers). 
8.3 The Capital budget is based upon resourcing both discrete Capital Projects and
ongoing programmes of Capital works up to 2027/28. The breakdown of
budgeted expenditure between Capital Projects and Capital Programmes is set
out in the table below: 
Table 3: Budgeted Expenditure on General Fund Capital 2023/24-2027/28 
Gross Expenditure Budget
2023/24 -
27/28
£’000
% of
Total
Budget
Budgeted Expenditure on Capital Projects 435,434 69.8%
Budgeted Expenditure on Capital Programmes 166,171 26.6%
“Prudential Borrowing” ** 22,311 3.6%   
Total Gross General Fund Capital Programme  623,916 100%   
**Refers mainly to the vehicle fleet and wheeled bin replacement programmes where
revenue savings generated through investment have been used to finance Capital
expenditure.   
8.4 With the exception of the PH2O project (see section 5 above), most of the
Council’s substantial Capital Projects over the period to 2027/28 are either
already on site or at an advanced stage of planning and have incurred significant
cost. This includes the Destiny Bridge, Perth High School Replacement and
Blairgowrie Recreation Centre Projects. The redevelopment project for Perth
Museum opens to the public in March 2024. 
8.5 There is consequently no officer recommendation to remove any currently
budgeted project from the approved General Fund Budget for 2023/24-2027/28.
Officer recommendations on the re-phasing of the project budgets for the new
primary school at Bertha Park and Perth West were approved by the Finance &
Resources Committee on 31 January 2024. 
Page 230 of 274

Page 231

8.6 Given the significant level of investment required to support the Council’s
existing infrastructure and assets highlighted through the Corporate Asset
Management Framework, there are no officer recommendations to reduce the
budgeted level of expenditure on Capital Programmes over the period 2023/24-
2027/28. 
8.7 Recommendations 
Council is asked to approve setting a 6 Year Capital Delivery Programme
for the period 2024/25 – 2029/30 based on updating the current General
Fund Budget attached at Appendix 1 to the report. 
8.8 All of the recommendations within this report are, therefore, either already
funded within or are in addition to the expenditure detailed at Appendix 1. 
9. RECOMMENDATIONS ON CAPITAL PROGRAMME EXPENDITURE 
9.1 Based upon estimated lifecycle planning costs, the potential investment
requirement in the Council’s existing assets and infrastructure is currently
forecast at approximately £2.6 billion over the 30-year period to 2054 (section 4
and table 1 above refer). 
9.2 It is recognised that investment requirements over such a diverse asset base
and over an extended timescale should be regarded as indicative.  The actual
level of investment required will depend upon a range of factors such as the
future condition of the Council’s assets and infrastructure; ongoing investment
decisions; future legislative and regulatory standards; cost inflation and the future
policy objectives of the Council amongst others. 
9.3 The Council has no budget provision for Capital Programmes of works beyond
2027/28 and the conclusion of the current 5 Year approved General Fund Capital
Budget, Therefore, officers recommend that in setting the 6 Year Capital Delivery
Programme for 2024/25-2029/30, the Council provides for ongoing investment in
its existing assets and infrastructure through continued funding for Capital
programmes in financial years 2028/29 to 2029/30.   
9.4 Given the extremely challenging financial position the Council faces, the
following recommendations are based upon largely maintaining the same level of
investment in the Council’s Capital Programmes as at present. 
9.5 In recommending Capital Programmes in 2028/29 and 2029/30 based on current
levels of investment on the grounds of affordability, there is an explicit
acknowledgement that due to cost inflation this will not provide sufficient capacity
to maintain all infrastructure and assets in their existing condition. 
9.6 It is, therefore, anticipated that the level of future investment in the Council’s
Capital Programmes and its existing infrastructure and assets will form a key
area of consideration for the Strategic Investment Advisory Group 
Page 231 of 274

Page 232

9.7 The table below sets out officer recommendations on the level of budgeted
investment in each Capital Programme area, together with the average level of
annual investment by programme over the 5 years of the current General Fund
Capital Programme:   
Table 4: Recommendations on General Fund Capital Programmes in
2028/29 and 2029/30 
Capital Programmes 5 Year 
Average
Annual 
Investment
2023/24-
2027/28
£’000
Recommended
Budget
2028/29 
£’000
Recommended
Budget
2029/30 
£’000
Structural Maintenance 9,600 10,000 10,000
Bridge Refurbishment 2,200 2,000 2,000
Road Safety 400 400 400
Footways 400 410 410
Traffic Signals 100 100 100
Street Lighting 700 600 600
Play Area
Improvements
500 500 500
Community
Greenspace 
700 700 700
Cemetery Extensions 200 300 300
IT Infrastructure &
licensing
3,300 6,209 2,984
School Audio-Visual
replacement
200 300 471
Supporting Digital &
Data Analytics 
1,600 1,630 1,653
Property (including the
Learning Estate)
9,800 10,000 10,000
Health & Social Care
(Occupational 
Therapy & IT)
320 320 320    
Total 30,020 33,469 30,438 
Page 232 of 274

Page 233

9.8 The total recommended investment in IT and Digital programmes over the two-
year period 2028/29 – 2029/30 is £12.476 million (excluding School audio-visual
replacement). This reflects the assessed requirements of the ICT and Digital
Asset Management Strategy 2023-29 and comprises the following elements: 
• £9.193 million budget provision for delivering, upgrading, and improving the
core IT infrastructure.  This supports expenditure on IT assets including
computers; telephony; network infrastructure and security. 
• £3.283 million budget provision for investment in our digital platform to
further improve customer access to Council services and investment in data
analytics and automation. 
9.9 Recommendation: 
Council is asked to approve budget provision of £33.469 million in 2028/29
and £30.438 million in 2029/30 for Capital Programmes as presented in
section 9 and table 4 above. 
9.10 Prudential Borrowing Programmes 
The Council also provides for what are referred to as Prudential Borrowing
Programmes where revenue savings generated through investment have been used to
finance Capital expenditure. These relate mainly to expenditure on the Council’s
fleet vehicles and associated equipment and the Council’s wheeled bin
replacement programme.   
As with the Council’s other Capital Programmes, provision for maintaining these
programmes requires to be included in setting the 6 Year Capital Delivery
Programme for 2024/25 – 2029/30. The estimated investment requirement on
the Prudential Programmes, based upon current levels of expenditure, is
approximately £3.370 million in both 2028/29 and 2029/30 or £6.740 million in
total. 
9.11 Recommendation: 
Council is asked to approve budget provision of £3.370 million in both
2028/29 and 2029/30 for the Prudential Borrowing Programmes as set out
in paragraph 9.10 above. 
10. RECOMMENDATIONS ON CAPITAL PROJECT EXPENDITURE 
10.1 Further to the work on developing the Council’s Corporate Asset Management
Plan and the continued review of the current and proposed capital projects,
officers recommend the following additional expenditure on Capital Projects in
setting the 6 Year Capital Delivery Programme. 
10.2 Recommendations on additional project expenditure are based upon assessed
need and have been restricted to:
Page 233 of 274

Page 234

• Projects where the Council has an obligation to incur expenditure. 
• Expenditure on the urgent replacement or upgrade of infrastructure / assets
which are critical to service delivery.
10.3 Perth Transport Futures Phase 3 - Bertha Park Link Road £13.2 million. 
10.3.1 The Perth Transport Futures Programme is the delivery response to the
challenges and opportunities set out in the Shaping Perth’s Transport Future
Strategy which was approved by the Council in January 2012. The programme
comprises 4 phases: 
Phase 1 – A9/A85 improvements completed in May 2019. 
Phase 2 – Destiny Bridge (formerly the Cross Tay Link Road project), due for
completion in Spring 2025. 
Phase 3 – Bertha Park Link Road linking Phases 1 and 2. 
Phase 4 – associated Perth City centre improvements including traffic
management measures; public transport and active travel development. 
10.3.2 Delivery of Phase 4 (associated Perth City centre improvements) is dependent on
completion of Phase 3 to enable more radical change in the city centre. A
background paper for the Bertha Park Link Road project is attached at Appendix
2 to the report.
10.3.3 Under the terms of the extant Section 75 Planning Agreement the developers,
Bertha Park Ltd, had the option to either deliver the link road (Phase 3) directly or
contribute to the capital cost of the Council delivering it. Bertha Park Ltd have now
formally notified the Council that they will not deliver the link road but instead will
take up the option of making an agreed contribution toward the cost as a
Developer Contribution.  
10.3.4 The estimated cost of constructing the Bertha Park Link Road is currently forecast
at £13.2 million.  The new link road will be built to the same standard as the existing
Phase 1 and 2 roads, including the required pedestrian and cycle provision. 
10.3.5 The Council has the option to include the development of a Park & Choose facility
into the design for the link road and benefit from economies of scale in constructing
the facility alongside the main link road project. The Bertha Park site is the only
site identified in the Local Development Plan for a Park & Choose facility on the
northern approaches to Perth. This location is considered optimal given the A9
traffic from the north, the Cross Tay traffic from the A93 and A94 and the nearby
Bertha Park major housing site. The cost of constructing a Park & Choose facility
on the site is currently estimated at an additional £8.7 million. The current estimate
for the total cost of constructing the Bertha Park Link Road with a Park & Choose
facility is, therefore, £21.9 million. 
10.3.6 Given the financial constraints faced by the Council, officers recommend the
inclusion of budget provision for the Bertha Park Link Road only at this time. 
Page 234 of 274

Page 235

10.3.7It is, however, recognised that there are likely cost economies from developing
the link road project and a Park & Choose facility at the same time. The
development of a Park & Choose facility at Bertha Park would align closely with
the Council’s strategic climate change priorities and provide improved facilities
for the management of traffic in Perth City.   
10.3.8 Recommendation: 
Council is asked to approve budget provision of £13.2 million for the
Bertha Park Link Road project, as presented in section 10.3 above and
Appendix 2 to the report. 
10.4 Flood Schemes  - £4.317 million 
10.4.1 The Council has several Flood Schemes in development which have been
approved for funding by the Scottish Government. The Scottish Government
funding commitment is to meet 80% of the contract award (tender price) of
approved schemes. The recipient authority being liable for meeting the remaining
20% plus any subsequent cost overrun.  The Scottish Government undertakes
regular monitoring of progress with approved schemes. 
10.4.2 The Council’s share of the cost of approved Flood Schemes is included within
the General Fund Budget 2023/24-2027/28 attached at Appendix 1. Based upon
monitoring submissions made towards the end of 2023, the Scottish Government
has increased the Council’s General Capital Grant in 2024/25 by £11.410 million
in 2024/25 and £5.858 million in later years (total £17.268 million) to meet the
forecast uplift in the cost of delivering the Council’s approved Flood Schemes. 
10.4.3 The following table sets out the latest forecast cost for the Council’s approved
Flood Schemes including both the Scottish Government’s and the Council’s
estimated funding commitments: 
Table 5: Recommended uplift in Council Funding for Scottish Government
approved Flood |Schemes). 
Flood
Scheme
Revised
Gross
Cost
Estimate 
£’000
Movement
in Gross
Cost
Estimate 
£’000
Revised 
SG
Funding 
(80%) 
£’000
Uplift in 
Grant
Finance
Circular
8/2023
£’000
Required
Uplift in
Council 
Funding 
£’000
Comrie 40,011 11,577 32,009 9,262 2,315
South
Kinross
15,075 11,314 12,060 9,051 2,263
Milnathort 910 (1,306) 728 (1,045) (261)
Total 55,996 21,585 44,797 17,268 4,317 
10.4.4 Recommendation: 
Page 235 of 274

Page 236

Council is asked to approve budget provision of £4.317 million to reflect
the revised cost estimates for Flood Schemes, as presented in section 10.4
above and table 5 in the report. 
10.5 IT Licensing & Infrastructure - £6.330 million 
10.5.1 The Council’s ambitious strategy for the use of information, technology, and
digital platforms to enhance customer access to Council services and drive
improvement in service delivery is set out within “Digital Perth & Kinross 2023-
2027”. 
10.5.2 Council was advised in October 2021 that the existing budget provision for
Microsoft licenses beyond 2024/25 did not fully reflect the move to an MS365
licensing environment (Report 21/181 refers). At that time, Council approved
additional Capital expenditure of £10.5 million for IT infrastructure and Digital
capacity but did not fully uplift the budget for future MS licensing costs. 
10.5.3 To meet the Council’s Microsoft licensing commitments over the period of the
Digital Strategy, officers recommend uplifting the budgets for IT licensing &
infrastructure by £6.330 million in setting the 6 Year Capital Delivery Plan. This is
in addition to the recommended funding for the IT Infrastructure and Licensing
Capital Programme in 2028/29 and 2029/30 set out in section 9 of the report.  A
background paper on IT & Digital investment requirements is attached at
Appendix 3 to the report. 
10.5.4 Recommendation: 
Council is asked to approve budget provision of £6.330 million for IT
licensing and infrastructure, as presented in section 10.5 above. 
10.6 Friarton Depot Waste Transfer Station - £3 million 
10.6.1 In September 2023, the Finance & Resources Committee approved the
application of £250,000 from the Property Compliance Works Programme to
meet the cost of urgent remedial works to the Friarton Depot Waste Transfer
Station following the identification of significant structural issues (Report 23/243
refers). 
10.6.2 The Waste Transfer Station is critical infrastructure to the operation of the
Council’s waste collection and handling services. While temporary arrangements
are in place, the current facility has reached the end of its operational life and
requires to be replaced. The estimated cost of a replacement Waste Transfer
Station at the Friarton Depot site is £3 million. 
10.6.3 Recommendation 
Council is asked to approve budget provision of £3 million for a
replacement Waste Transfer Station at the Friarton Depot site, as presented
in section 10.6 above.
10.7 MOSAIC - £1.158 million 
Page 236 of 274

Page 237

10.7.1 On full implementation, the MOSAIC system will be used to manage all
information relating to younger people and adults supported locally by the
Integration Joint Board (IJB) and Council social work and care services. 
10.7.2 Officers recommend additional investment of £1.158 million in MOSAIC to meet
additional implementation costs (£197,000); to resource a 2-year transition
period to 2027 where the project team is partially retained to support the
development of the system (£276,000) and to meet anticipated future licensing
costs for 2027-2030 (£685,000). 
10.7.3 Recommendation 
Council is asked to approve budget provision of £1.158 million for the
MOSAIC system, as presented in section 10.7 above. 
10.8 Traffic Signal Renewal --           £0.4 million 
10.8.1 There is no provision within the General Fund Capital Budget for the renewal of
traffic signals beyond 31 March 2024. 
10.8.2 The recommendations on Capital Programmes in section 9 of the report include
provision for £100,000 of investment on traffic signal renewal per annum in
financial years 2028/29 and 2029/30. 
10.8.3 Although more accurately a programme of works, the recommendation is to
provide for £400,000 of expenditure on traffic signal renewal over the 4-year
period 2024/25-2027/28 to maintain annual investment of £100,000 in signal
renewal. This is in addition to the recommendation in section 9, bringing the
total proposed additional investment in traffic signal renewal to £0.6 million over
a 6-year period. 
10.8.4 Recommendation 
Council is asked to approve budget provision of £0.4 million for traffic
signal renewal as presented in section 10.8 above.  
Page 237 of 274

Page 238

10.9 Summary of Officer Recommendations on Capital Project Expenditure 
Table 6: Recommendations on Capital Project Expenditure 
Project Recommended
Investment
£’000
Bertha Park Link Road (excluding provision for Park & Choose) 13,200
Flood Schemes  4,317
IT licensing & infrastructure 6,330
Friarton Depot Waste Transfer Station 3,000
MOSAIC 1,158
Traffic Signal Renewal 400
Total 28,405 
11.  PERTH WEST 
11.1 In March 2023, the Council considered the Outline Business Case for the Perth
Eco-Innovation Park (now referred to as Perth West to reflect the wider scope of
the proposed project) and approved £10 million towards the cost of delivering
enabling works for Phase 1 of the project (Report 23/73 refers). 
11.2 The current cost estimate for the advance infrastructure for Phase 1 of the Perth
West development is £32.8 million. A background paper on Perth West is
attached at Appendix 4 to the report. 
11.3 The current approved General Fund Capital Budget 2023/24 - 2027/28, attached
at Appendix 1 to the report includes the following funding assumptions for the
Perth West enabling works: 
11.4
At its meeting on 31 January 2024, the Finance & Resources Committee
approved the re-phasing of £3 million of expenditure on Perth West enabling
works from the current financial year to 2024/25 pending the outcome of ongoing
negotiations with the landowner (Report 24/41 refers). 
11.5 The current estimate of pre-construction costs for the Perth West project in
relation to site investigation and design is approximately £3 million. The revised
timeframe for delivering the enabling works is now likely to be towards the end of
2028 at the earliest. 
11.6 The assumption of significant developer contributions toward infrastructure costs
is central to the Council’s funding strategy for the enabling works for Perth West. 
£’000
Council Budget allocation (Report 23/73 refers) 10,000
Tay Cities Deal Funding 5,000
Future land sales  5,000
Developer Contributions 13,000
Total 33,000
Page 238 of 274

Page 239

Both the Council’s legal and planning teams are currently engaged with the
landowner and their representatives on this issue, 
11.7 Recommendation 
Council is asked to remit officers with providing a progress report on Perth
West to the Finance & Resources Committee on 12 June 2024 to confirm
funding to deliver the next stage of the project. 
12. CAPITAL FUNDING STRATGEY AND AFFORDABILITY 
Capital Resources 
12.1  The chart below sets out the financing of the current General Fund Capital
Budget 2023/24-2027/28. 
12.2 The Council’s current and planned Capital expenditure is largely financed
through borrowing (c 80%). Borrowing is undertaken from the Public Works
Loans Board (PWLB) which is operated by the UK Debt Management Office on
behalf of HM Treasury. As is common amongst local authorities, the Council’s
borrowing is almost exclusively sourced through the PWLB as this has
historically allowed the Council to access borrowing significantly below
commercial rates. 
12.3 Capital Grants currently represent c.15% of the Council’s Capital funding. The
£93 million forecast until the end of 2027/28 mostly comprises £73.5 million of
Scottish Government General Capital Grant funding and the balance of £15
million of funding from Transport Scotland for the Destiny Bridge project (Cross
Tay Link Road). 
12.4 As set out in section 7 and table 2 above, the Council’s General Capital Grant
Funding reduced by £1.179 million in 2024/25 from the previously forecast
position. While this was more than offset by a significant increase in funding for
Borrowing
£498m
80%
Capital
Grants
£93.1m 15%
Receipts
£7m  1%
Capital
Contributions
£25.8m
4%
5%
FINANCING  OF GENERAL FUND CAPITAL BUDGET
2023/24-2027/28     £623.9 MILLION
Page 239 of 274

Page 240

approved Flood schemes, the expectation is that General Capital Grant funding
from the Scottish Government will remain constrained in future years. 
12.5 Contributions towards Capital expenditure currently represent 4% of the
Council’s Capital funding and includes £5.3 million of Tay Cities Deal funding;
£7.4 million in third party and £12.7 million is anticipated developer contributions
towards infrastructure costs under planning agreements. The value of developer
contributions is anticipated to grow in future years as housing developments
progress. 
12.6 Historically, the Council has financed only a small percentage of its Capital
expenditure from Capital receipts and the estimate of £7 million to 2027/28
includes £3.2 million of ring-fenced receipts and £1.8 million of commercial
property receipts which are normally reinvested in the Council’s Commercial
Property Investment Programme. 
12.7 Given the Council’s reliance on borrowing to finance Capital expenditure, the
focus of the Council’s Capital Funding Strategy must be on developing a
sustainable approach to meeting current and future borrowing costs. As servicing
the Council’s borrowing is a long-term Revenue expense, any Capital Funding
Strategy must take account of both the considerable pressures on the Council’s
Revenue expenditure and the impact on service delivery of allocating increasing
levels of Revenue resources to debt servicing. 
12.8 All Council borrowing, and investment is governed by the CIPFA Prudential Code
and the Council’s approved Treasury and Investment policy, the latest iteration of
which will be considered by Council in March. Both borrowing and investment
activity are reported to the Finance & Resources Committee through the
Treasury Activity & Compliance reports.   
12.9 As previously reported, there are several factors which are impacting on the
financial sustainability of the Council’s Capital investment. In summary: 
• Perth & Kinross Council has an ambitious Capital Budget. The Council has
recently completed or is in the process of delivering significant Capital
Projects including Destiny Bridge (£110 million net); Perth High School
Replacement (£80 million); Perth Museum (£27 million); Blairgowrie
Recreation Centre (£36 million) and Riverside Primary School (£19.9
million). Also factored into the current funding strategy is a provision of £90
million for the leisure assets review and £24 million for a new school at
Bertha Park.  
Page 240 of 274

Page 241

• The cost of delivering assets and infrastructure has increased significantly
post Covid across all sectors of the economy. A combination of more
exacting building standards, tender price inflation and the Council making a
commitment to low carbon design in the Council’s Climate Change Strategy
and Action Plan has increased capital costs. However, approaching projects
such as Riverside PS and Perth HS with the Passivhaus standard has
allowed access to significant 25-year revenue support through the Scottish
Government Learning Estate Investment Programme. The Passivhaus
standard delivers measurable operational energy / carbon savings and
construction quality improvements but currently at increased market cost on
previous approaches. 
• The cost of borrowing from the Public Works Loans Board has been
impacted by increases in the cost of UK Government borrowing. Over the
preceding 10 years, the Council has borrowed at an average interest rate of
2.16% from the PWLB. The current financial modelling, discussed in more
detail later below, assumes interest rates on new PWLB borrowing of
between 4.5% reducing to 3.3% over time. Existing PWLB debt is unaffected
as lending is taken at a fixed rate for the period of the loan. 
• The increase in the cost of borrowing coincides with a period in which the
Council’s requirement to borrow to finance the approved Capital Budget has
never been greater. Table 8 below details the Council’s forecast Capital
Financing Requirement (borrowing) over the next 6 years for both the
Council’s General Fund (non-housing) Capital Budget and Housing
Investment Programme. 
• As noted at 12.7 above, the pressure on local authority budgets from cost
inflation; constrained income and growth in the need for Council services is
such that the long-term commitment of further Revenue resources to finance
Capital investment on an affordable basis is increasingly challenging. 
Capital Funding Strategy; Financial Modelling and Assumptions 
12.10 The Council’s Capital Funding Strategy is based upon: 
- Increasing the Council’s Revenue budget for borrowing costs (referred to as
the loans charges budget) over time. 
- The managed use of the Council’s Capital Fund 
Page 241 of 274

Page 242

- Supported by Scottish Government Capital Grant funding, contributions, and
receipts (see 12.1 above) 
12.11 Subject to approval of the Final Revenue Budget, the Council’s loans charges
budget in 2024/25 will be £16.478 million. This includes the proposed £800,000
increase in the loan’s charges budget reflected in the 2024/25 Provisional
Revenue Budget.  The Council’s loans charges budget will be uplifted by a
further £450,000 each and every year from growth in the tax base as previously
approved by Council in February 2022 (Report 22/36 refers). 
12.12 The audited balance on the Council’s Capital Fund at 31 March 2023 was
£26.343 million. The Council applies the Capital Fund over the long-term to
support financing its Capital investment with any forecast over or under-spend on
financing costs in -year applied to or met from the Capital Fund. These
adjustments are reported to the Finance & Resources Committee as part of the
Council’s routine revenue monitoring (Reports 23/242; 23/315 and 24/40 refer). 
12.13 The Council’s current Capital Funding Strategy has been reviewed in preparing
the report. The financial modelling used to review the strategy assumes the
funding of previously approved Capital expenditure over the period 2024/25-
2027/28 and an additional £99 million of Capital expenditure in respect of the
recommendations within the report as summarised in table 7 below. The Capital
Delivery Programme has also been adjusted for the increase funding for the
Council’s approved Flood Schemes and the additional grant funding for Cycling,
Walking and Safer Streets projects.  
Page 242 of 274

Page 243

Table 7: Estimated Gross Capital expenditure on the 6 Year Capital
Delivery Programme 2024/25-29/30 (assuming all recommendations
accepted)   
Ref  
Current Approved Capital Budget 2024/25-2027/28
(detailed at Appendix 1)  
£432.7m
Provision for Capital Programmes in 2028/29 and
2029/30 (detailed in table 4)
9.10 £63.9m 
Provision for Prudential Borrowing Programmes in
2028/29 and 2029/30
9.12 £6.7m 
Additional expenditure on Capital Projects (detailed in
table 6)
10.1-
10.8
£28.4m 
Sub-Total: Recommendations within Report   £99.0m
Adjustment for uplift in funding of Flood Schemes inc.
carry-forward of grant (scheme budgets detailed in
table 5)
10.4  £23.7m    
Adjustment for Cycling, Walking & Safer Streets
funding  
£0.9m    
Estimated Gross Capital Expenditure 2024/25-
2029/30 
£556.3m 
12.14 Based on forecast Scottish Capital Grant funding; Contributions to Capital and
Capital receipts over the period 2024/25-2029/30, the following Capital Financing
Requirement (underlying need to borrow) has been assumed in the financial
modelling and Capital Funding Strategy: 
Page 243 of 274

Page 244

Table 8: Forecast Capital Funding & Capital Financing Requirement 2024/25 -
29/30 and overall PWLB Debt (including both General Fund and Housing
Capital expenditure) 
Financial Year  2024/25
£m
2025/26
£m
2026/27
£m
2027/28
£m
2028/29
£m
2029/30
£m
Total
£m
Gross
Capital
Expenditure 
205.2 118.3 90.4 71.4 37.0 34.0 556.3        
Funding       
Capital Grant 24.7 12.8 18.2 12.4 12.3 12.4 92.8
Contributions 4.1 3.1 5.2 8.5 4.0 4.4 29.3
Receipts 0.9 1.0 1.2 1.3 1.0 1.0 6.4        
Capital
Financing
Requirement
(borrowing-
General
Fund)
175.5 101.4 65.8 49.2 19.7 16.2 427.8
Total Funding 205.2 118.3 90.4 71.4 37.0 34.0 556.3        
Estimated  
PWLB
Debt 
(see Note
below)
772 872 957 1,042 1,080 1,115 
Note: The table shows the Council’s estimated Public Works Loans Board (PWLB) Debt at the
end of each financial year on a cumulative basis assuming all the recommendations within the
report are approved. New borrowing will be undertaken in line with the requirements of
delivering the Capital Programme and prevailing borrowing rates. 
The estimate includes the borrowing required to support the recommendations within the report
on the Council’s General Fund (non-housing expenditure) of £427.8 million and a further £99.4
million of estimated borrowing required to support the Council’s investment in its social housing
stock over the same period 2024/25-2029/30. Investment in Council housing is funded from the
Housing Revenue Account (rental income), supplemented by Scottish Government grant
funding. 
The estimate for new borrowing each year also takes into account loans which are due to be
repaid in full and any required debt re-financing less a provision for the annual repayment of
debt. 
Page 244 of 274

Page 245

12.15 Interest rate assumptions have been reviewed based on forecasts from the
Council’s treasury advisors and current market expectations.  Average PWLB
borrowing rates of between 4.5% reducing over time to 3.3% have been used for
the purposes of modelling but these should be considered as indicative only and
will remain subject to ongoing review. 
12.16 The Capital Funding Strategy assumes the long-term use and availability of the
Capital Fund to support Capital investment. This reflects the fact that much of the
Council’s PWLB borrowing has been taken out over a 50-year period to support
investment in assets and infrastructure with a long useful life, in some cases
more than 100 years. 
12.17 At the point where the Capital Fund is fully applied, the Council will require to
address any recurring deficit on financing costs through the commitment of
additional Revenue funding. Council budgets have previously been set on
projections of the Capital Fund continuing into the late 2040s / early 2050s which
will enable the Council to take a long-term managed approach to resourcing its
Capital investment. 
12.18 The timescale over which the Capital fund is fully applied is, therefore, a key
measure of the long-term affordability of the Council’s planned Capital
investment. 
12.19 Financial Modelling of Proposed Capital Expenditure on Current Capital
Funding Strategy 
The graph below models the forecast implications of the current Capital Funding
Strategy on the timescale over which the Council’s Capital Fund is fully applied
using the following set of assumptions: 
• Gross Expenditure on the General Fund Capital Budget of £556.3 million
over the period 2024/25 – 2029/30 as summarised in table 7 above.
• Additional PWLB borrowing to support this expenditure estimated at £427.8
million over the period 2024/25- 2029/30.
• Average interest rates on PWLB borrowing in the range of 4.5% - 3.3%,
with the assumption that rates will reduce over time.
• Loan Charges Budget of £16.478 million in 2024/25 increasing by £450,000
year on year from growth in the Council Tax base (as previously approved
by Council).
Under the current Capital Funding Strategy: 
• The Council’s Capital Fund is forecast to be fully applied by financial year
2030/31.
• Deficit in 2031/32 is estimated at approximately £3.7 million, this will require
to be addressed through additional Revenue funding.
• Deficit varies between years but increases over time. 
Page 245 of 274

Page 246

Forecast Balance on Capital Fund under current Funding Strategy 
12.20 Implications of Financial Modelling 
The current Capital Funding Strategy does not provide a sustainable basis on
which to resource the proposed level of Capital investment on the Council’s
assets and infrastructure over the next 6 financial years. 
The requirement to address a significant financial deficit in the strategy by the
end of the next 6 Year Capital Delivery Programme will further exacerbate the
existing pressure on the Council’s Revenue Budget and impact on the delivery of
Council Services.   
The potential for reviewing the level of planned expenditure is also limited by the
fact that the Council is already on site and delivering a substantial part of its
planned investment over this period. Approximately 78% (£432.7 million) of the
Council’s proposed non-housing investment over the next 6 years is already
included within the currently approved General Fund Budget, including several
major projects under construction. 
12.21 RECOMMENDED UPDATE TO CAPITAL FUNDING STRATEGY 
The 2025/26 & 2026/27 Provisional Revenue Budgets, therefore, include the
recommendation to update the Capital Funding Strategy through ring-
fencing 1% of future Council Tax increases to support the Capital Budget.
This recommendation forms part of the separate Revenue Budget report to this
meeting of the Council as it requires an adjustment to the Revenue Budget. 
Based on the current Council Tax base and current collection levels, this
recommendation is estimated to add an additional £1.1 million recurring to the
Council’s Loans Charges budget in each year the ring-fencing is applied. 
The impact of an annual and recurring uplift in the Council’s loans charges
budget will improve the resilience of the Capital Funding Strategy by extending
the period over which the Capital Fund will be available to support Capital
Page 246 of 274

Page 247

investment. It will allow the Council to take a long-term strategic and managed
view on how it finances its planned Capital expenditure going forward and, if
maintained, afford the Council with further options for Capital investment. 
The recommendation is, however, presented as a long term and recurring
adjustment to the Council’s Capital Funding Strategy. In the event of any future
restriction being placed on Council Tax increases, the equivalent uplift in the
Council’s loan charges budget will require to be accommodated through other
measures, including budget cuts, to ensure the strategy remains robust. 
The Council’s Capital Funding Strategy must, therefore, be seen as dynamic and
will require ongoing adjustment for any changes in the Council’s forecast funding
position, other emerging investment priorities, challenges in Capital delivery and
changes in borrowing costs or other unforeseen events. 
13 RISK ASSESSMENT 
13.1 Determining the 6 Year Capital Delivery Programme and related Capital Funding
Strategy requires an assessment of the financial, delivery and operational risks
which may impact upon the Council’s current and future Capital investment. 
It is not possible to fully mitigate against these risks within the Council’s limited
resources and any recommended corrective action will be set out in update
reports to the Finance & Resources Committee or Council. 
13.2 Construction Inflation 
There has been a significant increase in the cost of Capital investment over
recent years.  The Building Cost Information Service (BCIS) 5-year forecast
published in March 2023 forecasts tender prices to rise by 17% in the five years
to quarter 1 2028. Although construction inflation has reduced in recent months,
the industry remains liable to further disruption due to global political and
economic factors.  The affordability of the Council’s Capital investment could be
significantly impacted by adverse movements in construction inflation which
would require both a review of planned investment and the Council’s Capital
Funding Strategy. 
13.3 Capital Borrowing Costs and Regulatory Risk 
The Council’s Capital investment is predominantly financed through borrowing
from the Public Works Loans Board (PWLB). The proposed Capital Delivery
Programme will require the Council to increase its borrowing for non-housing
Capital expenditure by approximately £428 million over the 6 years to 2029/30
during a period when PWLB borrowing costs are anticipated to remain
significantly higher than over the preceding 10-year period. This is before
allowing for any variation from budget in the  cost of delivering Capital Projects or
Programmes. 
PWLB borrowing is undertaken at prevailing HM Treasury rates on the day the
loan is taken out and these rates remain fixed for the entire period of the loan. 
The rates themselves reflect the cost of UK Government borrowing and
Page 247 of 274

Page 248

prevailing market conditions. Loans are approved on the basis that local
authorities can evidence their borrowing is affordable and is not being
undertaken for onward investment. All Council borrowing is also governed by the
CIPFA Prudential Code and the Council’s approved Treasury & Investment
policy. 
Assumptions of higher PWLB borrowing costs have been reflected within the
financial modelling which supports the recommendations on the Capital Funding
Strategy. There remains, however, both a risk that borrowing costs increase by
more than forecast and/or that Treasury conditions and regulations on local
authority borrowing change in a manner which adversely impacts upon the
Council.  The affordability of the Council’s Capital investment could be
significantly impacted by either event which would require both a review of
planned investment and the Council’s Capital Funding Strategy. 
13.4 Council Funding 
The level of Capital investment which the Council can support is largely a
product of its ability to borrow which is a Revenue expense. There is a risk that
any adverse change in either the Council’s Revenue or Capital Grant funding
from the Scottish Government may have a significant impact on the affordability
of the Capital Delivery Programme. This would require corrective action to both
planned expenditure and the approved Capital Funding Strategy.   
13.5 Capacity to Deliver 
The Council’s planned Capital investment is dependent upon the availability of
external contractors capable of delivering proposed schemes and of in-house or
consultancy resources with the experience and knowledge to consult upon, plan,
co-ordinate and oversee the delivery of what are often complex and large-scale
projects. 
There is a recognised shortage in the employment market of skills in specialist
areas such as structural engineering. The impact of current and future budget
cuts may further reduce internal capacity to employ and retain staff to deliver
Capital investment and appropriate consultancy support may not always be an
available or cost-effective option. 
All local authorities experience some degree of slippage in the delivery of their
Capital Programmes for similar reasons. The Council will, therefore, need to
consider delivery risk in both setting an affordable programme and in managing
community expectations on delivery. 
14 SUMMARY 
14.1 The report reflects the recent decisions of Council in respect of the Corporate
Asset Management Framework; the Transformation Review of Leisure Assets
and the Review of the Learning Estate as set out in sections 4, 5 and 6 of the
report. 
Page 248 of 274

Page 249

14.2  In accordance with the previous decision of Council, £90 million is provisionally
allocated within the Capital Delivery Programme for the Review of Leisure
Assets, as set out in section 5 of the report. 
14.3 The report recommends that Council determine a 6 Year Capital Delivery
Programme for the period 2024/25-2029/30 based upon the existing approved
General Fund Capital budget, as summarised in section 8 of the report and
detailed at Appendix 1. 
14.4 Officers have reviewed the Council’s General Fund Budget and have made
recommendations on additional Capital investment totalling approximately £99
million, as set out in sections 9 and 10 of the report and summarised in table 7. 
14.5 Officers recognise the significant decisions the Council has already made in
respect of its Capital investment and the challenge this presents in terms of
affordability. Officer recommendations are, therefore, limited to maintaining
investment in existing Council infrastructure and assets and on new projects only
where these reflect an obligation upon the Council or are critical to ongoing
service delivery. 
14.6 Officers are remitted with bringing a progress report on Perth West to the
Finance & Resources Committee on 12 June 2024 to confirm funding to deliver
the next stage of the project. 
14.7 An update is provided on the estimated borrowing required to fund the 6 Year
Capital Delivery Programme. The report also presents the financial modelling
which supports the recommendation within the Provisional Revenue Budget to
ring-fence 1% of future Council Tax increases to support the Capital Budget, as
set out in section 12 of the report. 
14.8 A Risk Assessment in relation to the Council’s Capital investment and Capital
delivery is set out, in overview, in section 13 of the Report. Council is strongly
advised that the Capital Funding Strategy must be viewed as a dynamic model
which will be kept under review. 
14.9 Any significant change in the Council’s overall funding position; the identification
of further investment priorities, the cost of project or programme delivery or the
cost of Council borrowing (as examples) will require the Funding Strategy to be
reviewed and, where necessary, adjusted. 
14.10 The Council’s Capital expenditure and funding position will continue to be
monitored on an ongoing basis and reported routinely to the Council’s Finance &
Resources Committee or Council, together with recommendations for corrective
action where necessary. 
14.11 The recommendations contained within this report are estimated to require the
Council to undertake approximately £428 million of additional borrowing over the
period 2024/25-2029/30 to support investment in non-housing Capital
expenditure. 
Page 249 of 274

Page 250

14.12 Combined with an estimated borrowing requirement of £99.4 million for
investment in the Council’s social housing over the same period, the Council is
forecast to have approximately £1.115 billion of outstanding debt with the Public
Works Loans Board by the end of financial year 2029/30.  The actual level of
investment undertaken and borrowing required is dependent on current and
future decisions by Council elected members. 
Author(s)
Name  Designation Contact Details
Stewart
MacKenzie
Head of Finance CHXFinance@pkc.gov.uk   
Project Leads  
IT, ICT and Digital
Alan Taylor
Strategic Lead –
Customer & Digital
Services 
CITARAdminSupport@pkc.gov.uk 
Bertha Park Link
Road
David Littlejohn
Strategic Lead –
Economy,
Development &
Planning 
Developmentmanagement@pkc.gov.uk 
Perth West 
David Littlejohn
Strategic Lead –
Economy,
Development &
Planning 
Developmentmanagement@pkc.gov.uk 
Approved 
Name Designation Date
Stewart MacKenzie  Head of Finance 16 February, 2024
Clare Mailer Director (Strategy, People
and Resources) 
16 February, 2024 
Page 250 of 274

Page 251

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND COMMUNICATION 
The undernoted table should be completed for all reports. Where the answer is ‘yes’,
the relevant section(s) should also be completed    
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment Yes 
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications    
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at a
corporate and service level and shape resources allocation.  They are as follows: 
• Tackling poverty
• Tackling climate change and supporting sustainable places
• Growing a sustainable and inclusive local economy
• Enabling our children and young people to achieve their full potential
• Protecting and caring for our most vulnerable people
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all objectives.  
Page 251 of 274

Page 252

2. Resource Implications 
2.1  Financial
2.1.1 There are no direct financial implications arising from this report other than 
those reported within the body of the main report. 
3. Assessments 
3.1  Equality Impact Assessment 
3.1.1 Under the Equality Act 2010, the Council is required to eliminate    
discrimination, advance equality of opportunity, and foster good relations 
between equality groups.  Carrying out Equality Impact Assessments for plans  
and policies allows the Council to demonstrate that it is meeting these duties. 
3.1.2 The information contained within this report has been considered under the 
Corporate Equalities Impact Assessment process (“EqIA”) and has been
assessed as not relevant for the purposes of EqIA. 
3.2 Strategic Environmental Assessment 
3.2.1 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its proposals. 
3.2.2 The information contained within this report has been considered under the Act. 
However, no action is required as the Act does not apply to the matters
presented in this report.   
3.3 Sustainability 
3.3.1 Under the provisions of the Local Government in Scotland Act 2003 the Council
has to discharge its duties in a way which contributes to the achievement of
sustainable development. In terms of the Climate Change Act 2008, the Council
has a general duty to demonstrate its commitment to sustainability and the
community, and the environmental and economic impact of its actions.   
3.3.2 The information contained within this report has been considered under the Act. 
However, no action is required as the Act does not apply to the matters
presented in this report.   
4. Consultation 
4.1 Internal 
4.1.1 The Executive Leadership Team has been consulted in the preparation of this
report.   
Page 252 of 274

Page 253

5. BACKGROUND PAPERS 
5.1 No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973, other than any containing confidential or exempt
information, were relied on to any material extent in preparing the above report. 
6. APPENDICES 
Appendix 1 -  General Fund Capital Budget 2024/25 – 202027/28 
Appendix 2 - Background Paper, Bertha Park Link Road 
Appendix 3 – Background Paper, IT & Digital 
Appendix 4 – Background Paper, Perth West
Page 253 of 274

Page 254

Page 254 of 274

Page 255

APPENDIX I
APPENDIX 1(i)
Capital Capital Capital Capital Capital
Resources Resources Resources Resources Resources
2024/25 2025/26 2026/27 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000)
Revised Revised Revised Revised Revised
Budget Budget Budget Budget Budget
Capital Grants
Cycling, Walking & Safer Routes (CWSR) 200 200 200 200 800
Recycling Improvement Fund 0 0 0 0 0
Cross Tay Link Road - Transport Scotland 0 0 0 0 0
Inspiring School Age Childcare Spaces 0 0 0 0 0
General Capital Grant 13,847 12,639 12,150 12,150 50,786
Total Capital Grants 14,047 12,839 12,350 12,350 51,586
General Capital Receipts
General Fund - Capital Receipts 278 694 250 250 1,472
General Fund - Ring Fenced Receipts 352 352 902 1,047 2,653
Total General Capital Receipts 630 1,046 1,152 1,297 4,125
Commercial Property Receipts
Capital Receipts brought-forward 616 1,120 1,550 1,550 616
Commercial Property Capital Receipts 712 430 0 1,088 2,230
Capital Receipts carried-forward (1,120) (1,550) (1,550) (2,638) (2,638)
Total Commercial Property Receipts Applied 208 0 0 0 208
Contributions
Tay Cities Deal 999 550 505 2,946 5,000
Third Party Contributions 658 0 2,000 3,000 5,658
Developer Contributions 2,300 2,367 2,600 2,600 9,867
Revenue Budget Contributions 124 125 125 0 374
Total Contributions 4,081 3,042 5,230 8,546 20,899
Capital Borrowing Requirement 180,129 80,325 54,077 41,385 355,916
TOTAL CAPITAL RESOURCES/
GROSS BUDGET EXPENDITURE 199,095 97,252 72,809 63,578 432,734
4
Page 255 of 274

Page 256

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF  GROSSCAPITAL EXPENDITURE 2024/25 to 2027/28
APPENDIX I
APPENDIX 1 (ii)
Current Current Current Current Current
Approved Approved Approved Approved Approved
Budget Budget Budget Budget Budget
31-Jan-24 31-Jan-24 31-Jan-24 31-Jan-24 31-Jan-24
2024/25 2025/26 2026/27 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000)
EDUCATION AND CHILDREN'S SERVICES
Blairgowrie Recreation Centre - Replacement 13,150 4,003 0 0 17,153
Schools Modernisation Programme
Investment in the Learning Estate 10,388 8,550 8,650 6,823 34,411
Free School Meal Expansion Programme 2,000 0 0 0 2,000
Methven Primary School Refurbishment 140 0 0 0 140
Kirkmichael Primary School Upgrades 32 0 0 0 32
New Primary School at Bertha Park Site 0 500 7,500 15,400 23,400
Technology Upgrades 1,016 250 0 0 1,266
Perth Academy - Refurbishment 2,500 1,650 1,650 0 5,800
Perth Grammar School - Upgrade Programme Phase 3 2,120 1,500 504 0 4,124
Perth High School - New School Investment 31,500 10,600 3,600 0 45,700
Harris Academy/Invergowrie - Extension 150 0 0 0 150
TOTAL: EDUCATION AND CHILDREN'S SERVICES 62,996 27,053 21,904 22,223 134,176
COMMUNITIES
Traffic & Road Safety
Road Safety Initiatives (20mph Zones etc..) 446 362 362 361 1,531
Additional Road Safety - Pedestrian Crossings 175 175 175 0 525
20mph Signage Programme - Schools 119 0 0 0 119
Cycling Walking & Safer Routes (CWSR) 200 200 200 200 800
Car Parking Investment - Pitlochry 150 0 0 0 150
Sub-Total 1,090 737 737 561 3,125
Asset Management - Roads & Lighting
Structural Maintenance 9,498 9,498 9,706 7,500 36,202
Footways 410 370 410 410 1,600
Investment in Local Footpaths 0 100 100 0 200
Sub-Total 9,908 9,968 10,216 7,910 38,002
Asset Management - Bridges
Bridge Refurbishment Programme 2,458 1,914 2,213 2,897 9,482
Vehicular Bridge Parapets Programme - Assess & Upgrade 29 0 0 0 29
Old Perth Bridge - Strengthening 10 2,369 0 0 2,379
Perth Queens Bridge - Strengthening 60 70 2,153 0 2,283
Garry Viaduct 300 300 1,900 1,790 4,290
Sub-Total 2,857 4,653 6,266 4,687 18,463
Improvement Schemes
Cross Tay Link Road (CTLR) 26,213 0 0 0 26,213
A977 Upgrades 190 0 0 0 190
Sub-Total 26,403 0 0 0 26,403
Rural Flood Protection Schemes
Comrie Flood Protection Scheme 16,841 0 0 0 16,841
Milnathort Flood Protection Scheme 1,590 0 0 0 1,590
South Kinross Flood Protection Scheme 1,168 1,787 0 0 2,955
Scone Flood Protection Scheme 76 601 0 0 677
Sub-Total 19,675 2,388 0 0 22,063
Perth & Kinross Place-making
Perth & Kinross Lighting Action Plan 677 0 0 0 677
Sub-Total 677 0 0 0 677
Other Planning Projects
Perth Eco-Innovation Park at Perth West 23,800 9,017 0 0 32,817
Sub-Total 23,800 9,017 0 0 32,817
City Centre Developments
PH2O 30,000 25,000 20,000 15,000 90,000
Sub-Total 30,000 25,000 20,000 15,000 90,000
Page 256 of 274

Page 257

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF  GROSSCAPITAL EXPENDITURE 2024/25 to 2027/28
APPENDIX I
Current Current Current Current Current
Approved Approved Approved Approved Approved
Budget Budget Budget Budget Budget
31-Jan-24 31-Jan-24 31-Jan-24 31-Jan-24 31-Jan-24
2024/25 2025/26 2026/27 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000)
Community Greenspace
Play Areas - Improvements Implementation Strategy 963 611 150 150 1,874
3G Pitch, Blairgowrie 117 0 0 0 117
Settlement/Neighbourhood Parks 379 0 0 0 379
Countryside Sites 139 0 0 0 139
Community Greenspace Sites 627 682 682 678 2,669
Community Greenspace Bridges 31 0 0 0 31
Cemetery Extensions 60 229 225 375 889
Sub-Total 2,316 1,522 1,057 1,203 6,098
Support Services
PC Replacement & IT Upgrades
Hardware 15 15 14 14 58
Licenses 112 95 71 71 349
Sub-Total 127 110 85 85 407
Commercial Property Investment Programme
Broxden Drainage Mitigation Works 866 0 0 0 866
Sub-Total 866 0 0 0 866
Prudential Borrowing Projects
Wheeled Bin Replacement Programme - Domestic Bins 200 200 200 200 800
Wheeled Bin Replacement Programme - Commercial Bins 20 20 20 20 80
Recycling Containers, Oil Banks & Battery Banks Replacement Programme80 65 65 65 275
Litter Bins 50 50 50 50 200
Vehicle Replacement Programme 2,800 2,800 2,800 2,500 10,900
Street Lighting Renewal - LED & Column Replacement 888 825 541 592 2,846
Land Purchase & Development (Hotel Development) 950 950 0 0 1,900
Sub Total 4,988 4,910 3,676 3,427 17,001
Housing Projects
New Gypsy Traveller Site 0 1,990 0 0 1,990
Sub Total 0 1,990 0 0 1,990
TOTAL: COMMUNITIES 122,707 60,295 42,037 32,873 257,912
Health & Social Care
Occupational Therapy Equipment 250 250 250 250 1,000
Technology Enabled Telecare 1,537 1,000 1,000 1,000 4,537
Moving & Handling Office Refurbishment 29 0 0 0 29
Software Licences 53 53 53 69 228
Developing Supported Tenancies 229 0 0 0 229
TOTAL: HEALTH & SOCIAL CARE 2,098 1,303 1,303 1,319 6,023
CORPORATE AND DEMOCRATIC SERVICES
Property Services
DDA Adaptation & Alteration Works Programme 200 200 200 200 800
Property Compliance Works Programme 400 650 650 650 2,350
Capital Improvement Projects Programme 1,800 1,800 1,800 894 6,294
Decarbonisation - Prudential Borrowing Programme (PB) 1,300 0 0 0 1,300
Energy Conservation & Carbon Reduction Programme (PB) 150 150 150 150 600
Information Systems & Technology
ICT Infrastructure Replacement and Upgrade Programme 4,207 4,079 3,017 2,903 14,206
Data & Analytics 839 738 761 784 3,122
Supporting Digital 855 878 901 926 3,560
Software Licences (Revenues & Benefits) 51 51 51 51 204
School Audio-Visual (AV) Equipment Replacement Programme 173 35 35 605 848
Mosaic - Swift Social Work System Replacement 1,319 20 0 0 1,339
TOTAL: CORPORATE AND DEMOCRATIC SERVICES 11,294 8,601 7,565 7,163 34,623
TOTAL COMPOSITE GROSS EXPENDITURE 199,095 97,252 72,809 63,578 432,734
Page 257 of 274

Page 258

Page 258 of 274

Page 259

APPENDIX 2 
PERTH & KINROSS COUNCIL
28 FEBRUARY 2024
Strategic Investment & Capital Budget 2024/25 – 2029/30: 
Bertha Park Link Road
Briefing by Strategic Lead – Economy, Development & Planning 
This background paper provides information regarding the scope of the works for the
Perth Transport Futures Project (PTFP), Phase 3 Bertha Park Link Road.
The PTFP is the delivery response to the challenges and opportunities set out in the
Shaping Perth’s Transport Future Strategy which was approved by the Council in
January 2012. The PTFP comprises four phases: 
1. Phase 1 - A9/A85 Junction Improvement and Link Road to Bertha Park.
2. Phase 2 - Cross Tay Link Road connecting the A9, A93 and A94.
3. Phase 3 - Bertha Park Link Road, linking Phases 1 and 2; and
4. Phase 4 - Associated Perth city centre improvements including traffic
management measures, public transport and active travel development and
improving the public realm in and around Perth city. 
Delivery of the PTFP remains a key strategic objective for the Council, with key
economic, environmental, and social benefits being delivered through it, including:
• Reducing congestion and improving air quality by diverting traffic away from
Perth city centre.
• Enabling the new, planned and committed developments set out in the Local
Development Plan by unlocking development land and allowing the sustainable
growth of the area to support key growth sectors.
• Enabling city centre improvements by reducing traffic volumes and freeing up
road space for improved public transport, active travel and public spaces (Perth
City Plan);
• Improving access to Inveralmond Industrial Estate, Scone Palace and Perth
Racecourse. 
• Linking communities via multiple modes of transport; and
• Reducing journey times to and from the city centre for local traffic.
Overall, the business case for the PTFP with all four phases completed will provide a
more efficient and better-connected transport system for Perth. The new infrastructure
will improve the travel options of the area’s workforce and help enhance the
attractiveness of the area to inward investors. The new infrastructure will additionally
generate new employment opportunities by enabling business growth. 
4
Page 259 of 274

Page 260

PHASE 3 - BERTHA PARK LINK ROAD
Phase 3 of the PTFP is the road which will link Phases 1 and 2. Phase 1 was
completed in May 2019, and Phase 2 is due for completion in Spring 2025. Delivery
of Phase 4 (associated Perth city centre improvements) is dependent on completion
of Phase 3 to enable more radical change in the city centre.
Under the terms of the extant Section 75 Planning Agreement the developers, Bertha
Park Ltd, had the option to either deliver the link road (Phase 3) directly or contribute
to the capital cost of the Council delivering it. Bertha Park Ltd formally notified the
Council that they will not directly deliver the link road but instead will take up the option
of making an agree contribution toward the cost. 
Currently the main housebuilder, Springfield Homes Ltd, have constructed just over
500 units with approximate build out rates of 100 per annum. While initial meetings
have taken place further discussions will require to be held with Bertha Park Limited
to take forward land acquisition and contractual issues regarding the construction of
the Phase 3 link. 
SCOPE OF PHASE 3
Option 1 involves construction of the new link road and inclusion of a dedicated park
and choose facility including future facilities for Electric Vehicle Charging and active
travel options. Option 2 provides for the link road itself without any other facilities. 
Option 1:  
Link Road and Park & Choose:
The Plan attached shows the link road joining Phases 1 and 2 of the PTFP. The Park
& Choose site is allocated in the Local Development Plan at a critical location where
major routes converge, and this is the optimal place for this type of facility. While the
initial demand forecasting has predicted low usage in the early years, given future
major development sites and potential changes in the city centre, it is highly likely there
will be significant uptake in later years. Given the strategic location, it is highly likely
there will be some new future business development nearby that can share the access
point with an apportionment of costs. There potentially can be an incremental change
in the number of spaces provided as future usage levels increase, thereby minimising
early year costs for the Council. The new link road will be built to the same standard
as the existing Phase 1 and 2 roads including the required pedestrian and cycle
provision. The latest estimated cost provided by the Council’s consultants, including
quantitative risk, is £21.9m. These costs do not include the roundabouts and
underpass required to serve private development. 
Page 260 of 274

Page 261

Option 2
Link road only:
The link road design is as Option 1 only not incorporating the Park & Choose facility.
The estimated costs for this Option are £13.2m (the Park & Choose costing £8.7m).
These costs also exclude the roundabout and underpass required to serve private
development. It should be noted that should a Park & Choose be required at a future
point in time it will be more expensive to construct. There will be an economy of scale
in constructing the facility with the main link road project. This is the only site identified
in the Local Development Plan for a Park & Choose on the northern approaches to the
city. This location is considered optimal given the A9 traffic from the north, the Cross
Tay traffic from the A93 and A94 and the nearby Bertha Park major housing site. 
Page 261 of 274

Page 262

Page 262 of 274

Page 263

1 
APPENDIX 3
PERTH & KINROSS COUNCIL
28 FEBRUARY 2024
Strategic Investment & Capital Budget 2024/25 – 2029/30: IT Licensing and Infrastructure
Briefing by Strategic Lead – Customer & Digital Services 
PURPOSE OF APPENDIX 
This briefing provides additional background information in relation to the proposed investment
in IT and digital set out within the Strategic Investment & Capital Budget 2024/25 – 2029/30
report to Council 
Strategic Context
Two key Strategies set out how ICT and Digital are being used to help the Council deliver its
corporate ambitions.
Digital Perth & Kinross 2023-27, the Council’s Digital Strategy recognizes the importance of
“building our infrastructure from strong digital foundations”. It identifies IT as a core utility,
fundamental to almost all staff for delivering Council services, communicating, and
collaborating. A “stable infrastructure, well managed to minimise risk and impact of downtime”
keeps us “connected, safe and productive” and provides a launch pad for delivering our
strategic aims.
The ICT and Digital Asset Management Strategy 2023-29 and Plan embed approaches for
ensuring the Council’s ICT and digital assets are effectively managed, throughout their
lifecycles, to achieve the best possible outcomes / value for service users and staff. Asset
Management focus is on six key areas: ensuring our core infrastructure is optimized, maintained
and fit for the future; securing our information assets; driving quality business intelligence from
our data assets; building “One Council” approaches for managing the Council’s business
systems; evolving fit for the future digital classrooms and using digital to contribute to the
Council’s net-zero targets.
Both of these strategies recognize infrastructure and data security is paramount: increasingly
sophisticated cyber-attacks, which pose a persistent threat to data, on-line / digital services and
the smooth operation of Council services, mean security is at the forefront of programme
planning and investment.
Roll-Forward of Programmes (2028/29 & 2029/20) 
The report  identifies £13.247 million budget provision for delivering IT and Digital Programmes
in 2028/29 – 2029/30. These programmes include: 
• upgrading and improving the core IT infrastructure (computers; networks; licenses;
telephony; connectivity and equipment; datacenters; servers; file storage; back up; security
4
Page 263 of 274

Page 264

2 
systems and video conferencing). Standard infrastructure replacement approaches are in
place for core infrastructure components, based on sound asset management principles. 
• prioritizing safety / securing the Council’s information assets. As our data, resources, and
users become increasingly dispersed, the likelihood and potential impact of cyber-threats are
increasing and evolving. Increasingly sophisticated threats, pose a persistent threat to data,
on-line / digital services and the smooth operation of Council services.  The challenge of
securing our network is becoming more complex: it demands automated defenses and
enhanced security / resilience to combat, and stay ahead of, automated cyber-attacks.
Ongoing investment is required to deliver industry-standard levels of secure, verified,
personalized access to Council resources. 
• continuing the School Audio-Visual Replacement Programme, which has delivered access to
audio visual (AV) panels in all Perth and Kinross schools and provided consistency of
experience and a sustainable management model for these key classroom tools. To
maintain fit for the future digital classrooms and exploit available advances in AV
technologies, continuing Capital funding is now required to replace / upgrade current
equipment as it falls beyond 10 years old. 
• delivering the data and analytics governance, tools, technologies, and organization-wide
skills required for better business intelligence, to drive informed decision making around
resources, priorities and service delivery. The Data & Analytics programme is embedding
whole-Council approaches and capabilities for managing our data assets in more effective,
efficient, and cohesive ways. 
• developing the capabilities, we need to be a truly innovative digital organization. This
includes further growth / development of our corporate mobile working and online services
platforms. These platforms are creating new digital products and services that enable 24/7
engagement for service users; reduce journeys for our employees (and by extension the
Council’s carbon footprint) to and between offices through improved scheduling of field-
based activities; and give employees access to, and the ability to update in real time,
accurate data, out in the field. 
“Supporting Digital” is also driving the Council’s Customer Services Strategy. This includes
building on the “One Front door” concept and further development of end to end digital
services, to simplify and standardize the customer experience, whatever the channel. As
more customer portals are developed by business system suppliers, the Programme is also
leading the development of standards around how these systems co-exist, to make it as
easy and secure as possible for customers to login to multiple systems. 
Other Supporting Digital workstreams include developing and implementing new Microsoft
(MS) 365 capabilities (e.g. Virtual assistants, process automation and workflows) and
deploying Internet of Things (IoT) / smart technologies that move services from reactive to
preventative ways of working, in areas such as housing stock management (e.g. energy
efficiency; quicker identification / rectification of defects; and Legionella monitoring). 
Page 264 of 274

Page 265

3 
IT and Digital Projects 2024/25 – 2027/28
Council is also asked to approve budget provision of £6.330 million for IT Capital projects  in
addition to the recommended funding for 2028/29 and 2029/30 described above.
This includes funding to:
• meet annual subscription costs from our evolving MS 365 environment and rectify a previous
MS 365 licensing shortfall resulting when additional year allocations beyond 2024/25 were
not allocated to the budget.  This was identified as a £6.25m funding gap as at 2021.
Although partial funding of £0.9m was allocated, it was recognized, at that time, that
additional monies would require to be added to the capital budget from 25/26 onwards, and
that a future capital budget setting process should allocate funding for missing / future years
in line with the principles of the Council’s Investment Blueprint, to maintain access to our MS
estate. 
• Maintain hybrid video conferencing facilities, including for the Council Chambers. Video
conferencing is a new infrastructure component, provision for which has not been made in
previous capital funding allocations. 
Page 265 of 274

Page 266

Page 266 of 274

Page 267

Appendix 4 
Perth & Kinross Council 
28 February, 2024 
Perth West
Enabling Infrastructure at Perth Eco-Innovation Park
Background paper
Purpose
This paper provides Members with an update on the Perth West development.
To secure future industrial and commercial occupiers at the proposed Perth
EcoInnovation Park (PEIP) investment in enabling infrastructure is required. This
infrastructure will also enable new housing development (including the proposed net
zero carbon Lamberkine Village) and therefore the greater proportion of the enabling
infrastructure costs will be recovered through future developer contributions. The
paper therefore also updates on the funding position and indicative income streams
to offset the estimated expenditure. 
Background information
It is difficult for private developers to raise finance for upfront infrastructure
investment because there is no obvious return to a lender. Such infrastructure is
normally provided by the public sector with a long-term legal obligation on
developers to meet a reasonable and proportionate cost through developer
contributions. Without public intervention at Perth West, the employment land at the
PEIP will not be provided in advance of housing development, weakening Perth’s
competitiveness given the undersupply of available, serviced industrial and
commercial plots. 
Perth West will support the delivery of key Council’s strategies: 
• PKC Corporate Plan: develop a resilient, stronger and greener economy,
tackle climate change and support sustainable places, and tackle poverty. 
• PK Climate Change Strategy and Action Plan: a national net zero exemplar
for decarbonisation of transport and energy.
• Tay Cities Regional Economic Strategy and the emerging Perth and Kinross
Economy Action Plan: create better paid and higher skilled jobs and high
value economic outputs in energy and clean technologies, support an
enterprising mindset.
• Perth City Plan: make Perth a carbon-neutral city by 2040. 
• Perth and Kinross Local Development Plan 2 (LDP2): promote the sustainable
economic growth of the area to the year 2029. 
LDP2 allocated 262.3ha for residential, commercial and community uses at Perth
West (Site MU70). The southern part of Perth West allocation is promoted by the
landowner, the John Dewar Lamberkine Trust (JDLT) (see Appendix 1). Planning
4
Page 267 of 274

Page 268

Permission in Principle was granted in November 2023 (application reference
20/00667/IPM). It includes 1,500 homes (Lamberkine Village) up to 26ha of
commercial development (PEIP) and other community infrastructure (see Appendix
2).
Because of the short supply of available employment land in the Perth area (and
indeed across the wider Council area), and the need to diversify Perth’s economy,
the strategic rationale is to start with the provision of employment land in advance of
residential development. This requires investment in enabling infrastructure to
access the site and deliver the first phase of the development: Specifically, the
enabling infrastructure will:
• Deliver an underpass under the A9 to access the site and establish active travel
infrastructure from Perth West into Perth City. This will minimise the impact of
traffic generated by the development and support sustainable transport choices. 
• Deliver a commercial business park with of 11ha of serviced employment land
(PEIP Phase 1). 
• Support business growth and create high value jobs in the clean growth sector.
Approximately 1000 jobs could be created when the PEIP is fully developed and
occupied over both phases. 
• Create a national exemplar of net zero carbon development. Phase 1 will
incorporate a smart local energy system, where energy can be generated, stored
and used locally.
A second, longer-term phase will provide up to 15ha of employment land and 500
homes, subject to further private sector infrastructure provision.
Progress 
A Project Board and Project Team have been established and are meeting regularly
to progress several workstreams critical to the development of the site: 
• Now that JDLT has vacant possession of the tenanted farm, land transfer of 11
ha for PEIP Phase 1 and the related road infrastructure is being negotiated with
JDLT.
• Heads of Terms with JDLT for the transfer of PEIP Phase 1 are being drafted.
• In terms of appropriate contributions toward enabling infrastructure delivery costs,
preparatory works to identify a methodology for the apportionment of costs is
underway, and discussions will continue with JDLT to incorporate this into a legal
agreement/contract which will require to be in place before any construction
contract is let.
• A Section 75 agreement (Planning Obligation) has been signed with JDLT
relating to the Planning Permission in Principle (application ref: 20/00667/IPM).
Contributions are agreed for primary education mitigation, land or equivalent
financial sum for healthcare facility, relevant sports and play facilities to serve the
development, contribution toward Transport Scotland’s Broxden Roundabout
Page 268 of 274

Page 269

improvement works, and financial contribution for Perth Transport Futures
Phases 1 and 2.
• A planning consent was issued to JDLT in November 2023.  Detailed planning
applications (Approval of Matters Specified in Conditions) will have to be
submitted before any development can commence.
• A Procurement Strategy was prepared for design work for the underpass and
related works and a contractor selected, but the contract for this early-stage work
cannot be awarded pending the Council’s capital budget consideration.
Financing and Revenue Generation 
Table 1 below shows the estimated costs (derived from cost consultant estimates) for
Phase 1.  For clarity this has been broken down into sections and varying ranges of
Optimism Bias (OB) applied and shown as a percentage. The initial cost estimates
included an OB of 30% given that only outline designs have been prepared, but
those that generally apply to roads infrastructure (23% structures, 15% roads) have
also been included. The selection of OB will depend on how much risk the Council
would be willing to accept. The costs make an assumption on inflation, but do not
include land purchase costs.
The enabling infrastructure could be delivered in sections. Section 1 will only take
the road beyond the underpass and would rely on future developer-led investment to
deliver sections 2 and 3, without any certainty that the employment land would be
provided within a reasonable timeframe.  In addition, there would be no Tay Cities
Deal grant which is attached to embedded smart road infrastructure.  Section 2 will
take the road up to the entrance of PEIP and initial housing development.  Section 3
will platform sites and provide connecting services at the PEIP, allowing site
marketing and occupation.
Table 1: Estimated costs
Section  Cost (£m)
30% OB
Cost (£m)
23% OB
Cost (£m)
15% OB
1 Underpass + Tweed Place Link 18.78 17.77 16.62
2 Underpass + Innovation
Highway Link to PEIP
25.20 23.86 22.31
3 Underpass + Innovation
Highway Link to PEIP +
Platforming + Utilities
32.84 31.35 29.65 
In March 2023 (Report 23/73), the Council approved funding of £10m towards the
cost of delivering the enabling infrastructure for Phase 1 of Perth West development
from the balance of its investment capacity and remitted officers with reflecting the
remaining cost of the enabling infrastructure as part of the development of an
updated Capital funding strategy for consideration in 2024. 
An application to the UK Levelling Up Fund for £10m was submitted at Round 2 but
was unsuccessful, and based on feedback a revised application was under
preparation for Round 3 when Ministers opted not to call for any new or revised
Page 269 of 274

Page 270

applications. The UK Government remains interested in the project but to date has
not offered any alternative grant funding solution. Dialogue continues. 
Table 2 below shows indicative income from developer and occupier contributions,
plot sale receipts and grants to offset the Council’s costs for Phase 1. It is intended
that the contributions from developers and occupiers will be apportioned based on
the use of enabling infrastructure by commercial and residential users. More detailed
work is required to complete this income projection in advance of the capital budget
setting.
Table 2:  Indicative income 
Sources  Income
(£m)
Sale of 90% of employment land (11ha =27 acres) @ £190,000/acre 5
Developers’ contributions from residential use of enabling
infrastructure still to be negotiated but based on development of
1,000 residential units. 
Developers/business occupiers’ contributions from employment use
of enabling infrastructure based on 11 ha.
13
(indicative)
Tay Cities Deal grant towards additional innovative solutions to be
embedded in the enabling infrastructure (Perth Innovation Highway)
5
TOTAL 23 
Receipts of c£5m from sales of serviced employment land have been based on
estimated market prices. There is strong interest from businesses in the transport,
logistics and energy sector to occupy the PEIP and develop innovative uses, for
example Stagecoach is interested in developing a state-of-the-art Electric Vehicle
facility. 
Members need to be aware that contributions from developers/occupiers have still to
be negotiated and are therefore not secured. Work is ongoing to identify potential
target sums for such contributions towards Phase 1. The contributions are focusing
on the development of 1,000 residential units for which a plan has been produced by
JDLT, and 11 ha for PEIP, although the level of contributions will not be agreed
before Council’s meeting on 28 February 2024.  It is also anticipated that a second
planning application, by Muir Homes, will be submitted during 2024 and associated
developer contributions will also be required, potentially spreading the cost between
two private developers rather than solely obligating JDLT. An indicative amount of
£13m has been included in table 2.
However, an estimated £3m of pre-construction expenditure, mostly related to site
investigation and design cannot be commenced because this is not a fully committed
capital project. As it stands even with budget agreement, Phase 1 is unlikely to be
completed before 2028.  
A Tay Cities Deal grant of £5m has been earmarked for Perth Innovation Highway
which is the innovation element of the enabling infrastructure involving the
installation of digital infrastructure and Intelligent Transport Systems to manage
transport in and around the site and the corridor between the site and Perth city
Page 270 of 274

Page 271

centre. A Full Business Case (in preparation) needs to be approved by the Tay Cities
Region Joint Committee mid-2024. 
Page 271 of 274

Page 272

Benefits 
Perth West will deliver a new neighbourhood for Perth and is central to meeting the
Council’s housing and employment land supply.  The PEIP has the potential to be a
net zero carbon employment site of national significance in terms of driving regional
productivity and a just transition to net zero.  The benefits include:
• Creation of net zero neighbourhood (Lamberkine Village) supporting a large
portion of Perth’s new housing requirements.
• Enhance sustainable connectivity through walking and cycling and innovation. 
• Generate net zero energy and support decarbonisation including transport. 
• Generate additional tax revenues.
More specifically, the benefits generated by the PEIP would include:
• Increased productivity by increasing employment in high productivity, high skills
and wage sectors. 
• Catalyse further development and private investment in the city. 
• Attract innovative businesses in new clean growth sectors. 
• Diversify Perth’s economy to broaden job opportunities, raise skills levels, and
average earnings. 
Risks
Though a solution is being worked on with the landowners, the Council does not yet
have formal commitment from any developers in terms of contributions, leading to a
potential financial and reputational risk. However, these risks are mitigated in that no
construction contract would be awarded until all legal agreements are in place. 
The Council does not yet have formal commitment from any potential PEIP business
occupiers, leading to a potential financial and reputational risk. The challenge for
businesses is that they cannot commit without certainty of delivery. This conundrum
is the principal driver of market failure in the provision of employment land in many
parts of the country.  
Timetable
An indicative timeline, should the budget be approved by Council in February 2024,
would be: 
• Design Consultant appointed by April 2024
• Infrastructure planning and concept design works commenced by April 2024 
• Planning permission granted by March 2026  
• Contractor in place by March 2027 
• Construction starts by March 2027 
• Main construction completed by December 2028.
It should be noted that there may be an opportunity to accelerate this programme
through early identification of opportunities and collaborative working from all parties
who are engaged to deliver the contract.
Page 272 of 274

Page 273

Appendix 1: Extent of Perth West JDLT area (planning ref: 20/00667/IPM)
Page 273 of 274

Page 274

Appendix 2: Indicative phasing plan and land uses (planning ref: 20/00667/IPM)
Page 274 of 274