Page 1

Appendix 1 
PERTH AND KINROSS COUNCIL
17 August 2022
APPLICATION FOR PLANNING PERMISSION 21/01855/IPM
Report by Head of Planning and Development 
(Report No. 22/185 (REVISED)) 
PROPOSAL:  Mixed use development comprising museum (including ancillary
shop and café), hotel and holiday lodge accommodation
(including ancillary shop and café functions), complementary
retail and associated access, parking, public realm, open space
and landscaping works (in principle) (LDP site RT1)
LOCATION: Caledonian House and land at West Kinfauns, Kinfauns
Holdings, West Kinfauns 
Ref. No: 21/01855/IPM
Ward No: P1- Carse of Gowrie
Summary 
This report recommends approval of an application for Planning Permission in
Principle for a major mixed used development comprising: a hotel, museum,
retail services, holiday chalets and the associated access, services and parking;
subject to conditions and a Section 75 legal agreement to secure the transfer of
land to the Council for the delivery of an optional ‘park and choose’ transport hub
within part of the site. The development is acknowledged to be a significant
departure from the adopted Local Development Plan (LDP) and therefore
requires Full Council approval. However, it is considered that there are material
planning considerations which justify a departure from the development plan,
notably the economic benefits for the Perth and Kinross area. It is recommended
that the extent of the retail floorspace that can be provided as part of the
development be restricted to ensure it is proportionate and reflective of the extent
of the proposed tourism offer; and that the site does not in itself become a
significant retail destination. This restriction is necessary to limit the impact on
Perth city centre and other identified retail centres, as well as reducing retail only
trips to the site.

Page 2

BACKGROUND AND DESCRIPTION OF PROPOSAL 
1 The application site, known as ‘West Kinfauns’, is situated some 10.8 hectares
(ha) and approximately 2 miles southeast of Perth City Centre. Indicative plans
show vehicular access off both the A85(T) and the Kinfauns Holdings Road
(U202), with the M90/Friarton Bridge further west. The small settlement of Walnut
Grove is just to the east, Kinnoull Hill is further north and the River Tay to the
south. In terms of land designations within the LDP, the site can be broken into
three main sections: 1) the southern and westernmost parts, occupying ground
primarily between the River Tay and existing built development onsite being
designated as open space; 2) employment safeguarded land, located within the
northeast part occupying ground surrounding existing built development onsite;
and 3) land designated as for the purposes of establishing a park and choose
transport hub (designated RT1). This is positioned at the western part bordering
Dundee Road, occupying an area approximately 1.8 ha in size.
2 The site comprises a large undeveloped field, bounded to the north by mature
vegetation and the public road network. The only building is ‘Caledonian House’,
which provides offices over two floors and sees parking, with a vehicle access off
the Kinfauns Holdings U202 Road to the north. This building is to be retained and
is not indicated to be affected by the proposals.
3 Planning Permission in Principle is sought for a mixed-use development,
although no detailed designs are submitted for assessment. The development is
classified as being Major in the hierarchy of development regulations. The
proposed quantum of uses is: 
a. A hotel, of 120 to 150 rooms;
b. Up to 52 holiday chalets;
c. A transport museum and associated workshop (c.5,500 square metres in
floor area (m2);
d. Complementary retail and support services, up to 1,000m2,* (*to be
contained within and appear part of the museum and workshop building).
The total size of that building thus being c.6,500m2,
e. Associated works including services, drainage works, access, parking and
landscaping.
4 The ‘park and choose’ transport hub has Planning Permission (Reference
18/02232/FLM). However, it does not form part of this application. To provide a
future opportunity for the Council to deliver this infrastructure, a Section 75
planning obligation is recommended by the Council’s Transport Planning Team
to require an area of land to be set aside by the developer for this use. The
proposed ‘park and choose’ transport hub comprises a public carpark with
capacity for approximately 100 vehicles, including bus shelter and bus turning
facilities, and electric vehicle (EV) charge points. This provision is not considered
in further detail in this report. At this time, the Council has only agreed to prepare
a business case and the project is not included in the current capital programme.

Page 3

5 A pre-determination hearing in respect of this application is required, in
accordance with Section 7 of the Town and Country Planning (Scotland) Act
1997 as amended and Regulation 27 of the Town and Country Planning
(Development Management Procedure) (Scotland) Regulations 2013. Regulation
27 provides that “before determining an application for planning permission for a
major development which is significantly contrary to the development plan, the
planning authority are to give to the applicant and to persons who submit
representations to the planning authority in respect of that application, an
opportunity of appearing before and being heard by a committee of the authority.”
A pre-determination hearing has been set to immediately precede the Council
meeting of 17 August 2022. 
Pre-Application Consultation
6 20/00542/PREAPP. Pre-application advice was provided by officers on 16
November 2020, in relation to a mixed-use development including; support
functions for longer stay accommodation and potential Spa style facilities; log
cabins for longer stay, larger groups – 5 days plus; a museum and supporting
services including complementary retail floorspace; and a potential and Park &
Ride facility.
7 The applicant has carried out formal pre-application consultation (PAC) in
accordance with the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 and the relevant provisions of the Town
and Country Planning (Scotland) Act 1997 (as amended). A PAC report was
submitted with this application confirming the completion of a digital public event
on 16 March 2021. This event was advertised in the Courier and by leaflet drop.
16 responses were received with concerns raised including traffic congestion and
road safety, the overall scale and size of the development and a lack of active
travel details. No specific concerns were raised regarding the museum or retail
options presented.
National Policy and Guidance
National Planning Framework 2014 (NPF)
8 NPF3 is a long-term strategy for Scotland and is a spatial expression of the
Government’s Economic Strategy and plans for development and investment in
infrastructure. This is a statutory document and material consideration in any
planning application. It provides a national context for development plans and
planning decisions, as well as informing the on-going programmes of the Scottish
Government, public agencies and local authorities.

Page 4

The Scottish Planning Policy 2014 (SSP)
9 The Scottish Planning Policy (SPP) sets out national planning policies which
reflect Scottish Ministers’ priorities for operation of the planning system and for
the development and use of land. The SPP promotes consistency in the
application of policy across Scotland whilst allowing sufficient flexibility to reflect
local circumstances. It directly relates to the: 
• preparation of development plans;
• design of development, from initial concept through to delivery; and
• determination of planning applications and appeals.
10 The following sections of the SPP will be of particular importance in the
assessment of this proposal: 
• Sustainability: paragraphs 24 – 35
• Placemaking: paragraphs 36 – 57
• Valuing the Natural Environment: paragraphs 193 – 218
• Managing Flood Risk and Drainage: paragraphs 254 – 268
• Promoting Sustainable Transport and Active Travel: paragraphs 269 – 271.
Planning Advice Notes
11 The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
• PAN 40: Development Management
• PAN 51: Planning, Environmental Protection and Regulation
• PAN 61: Planning and Sustainable Urban Drainage Systems
• PAN 65: Planning and Open Space
• PAN 68: Design Statements
• PAN 69: Planning and Building standards Advice on Flooding
• PAN 75: Planning for Transport
• PAN 77: Designing Safer Places
• PAN 79: Water and Drainage
• PAN 84: Reducing Carbon Emissions in New Development
• PAN 1/2013: Environmental Impact Assessment
TAYplan Strategic Development Plan 2016-2036
12 TAYplan sets out a vision for how the region will be in 2036 and what must occur
to bring about change to achieve this vision. The vision for the area, as set out in
the plan, states that:
13 “By 2036, the TAYplan area will be sustainable, more attractive, competitive and
vibrant without creating an unacceptable burden on our planet. The quality of life
will make it a place of first choice where more people choose to live, work, study
and visit, and where businesses choose to invest and create jobs.”

Page 5

14 The following sections of the TAYplan 2016 are of particular importance in the
assessment of this application: 
• Policy 1: Locational Priorities
• Policy 2: Shaping Better Quality Places
• Policy 3: A First Choice for Investment
• Policy 5: Town Centres First
• Policy 6: Developer Contributions
• Policy 8: Green Networks
Perth and Kinross Local Development Plan 2
15 The Local Development Plan 2 (2019) (LDP2) sets out a vision statement for the
area and states that, “Our vision is of a Perth and Kinross which is dynamic,
attractive and effective which protects its assets whilst welcoming population and
economic growth.” It is the most recent statement of Council policy and is
augmented by Supplementary Guidance. The following key policies  are
applicable to the assessment of this application: 
• Policy 1A: Placemaking
• Policy 1B: Placemaking
• Policy 1C: Placemaking
• Policy 4: Perth City Transport and Active Travel
• Policy 5: Infrastructure Contributions
• Policy 7A: Employment and Mixed-Use Areas: Business and Industrial
• Policy 9B: Caravan Sites, Chalets & Timeshare Developments: New and
Expanded Touring Caravan, Motorhome/ Campervan, and Camping Sites
• Policy 13: Retail and Commercial Leisure Proposals
• Policy 14A: Open Space Retention and Provision: Existing Areas
• Policy 15: Public Access
• Policy 17: Residential Areas
• Policy 26B: Scheduled Monuments and Archaeology: Archaeology
• Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
• Policy 38C: Environment and Conservation: Local Designations
• Policy 39: Landscape
• Policy 40B; Forestry, Woodland and Trees: Trees, Woodland and
Development
• Policy 41: Biodiversity
• Policy 47: River Tay Catchment Area
• Policy 52: New Development and Flooding
• Policy 53A: Water Environment and Drainage: Water Environment
• Policy 53B: Water Environment and Drainage: Foul Drainage
• Policy 53C: Water Environment and Drainage: Surface Water Drainage
• Policy 55: Nuisance from Artificial Light and Light Pollution
• Policy 56: Noise Pollution

Page 6

• Policy 57: Air Quality
• Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
16 The Scottish Government expresses its planning policies through The National
Planning Frameworks, the Scottish Planning Policy (SPP), Planning Advice
Notes (PAN), Creating Places, Designing Streets, National Roads Development
Guide and a series of Circulars. 
Supplementary Guidance 
17 The following supplementary guidance is of particular importance in the
assessment of this application: 
• Developer Contributions and Affordable Housing Supplementary Guidance
April 2020
• Air Quality and Planning Supplementary Guidance March 2020
• Flood Risk and Flood Risk Assessments Supplementary Guidance Adopted
March 2021
• Delivering Zero Waste Supplementary Guidance, January 2020
• Landscape Supplementary Guidance 2020
• Open Space Provision for New Developments Supplementary Guidance
Adopted March 2021
• Placemaking Supplementary Guidance, Adopted March 2020
• A guide to Incorporating Biodiversity into Development, Adopted April 2022
• River Tay Special Area of Conservation (SAC) Advice to developers when
considering new projects which could affect the River Tay Special Area of
Conservation (2020)
Other Material Considerations
18 Getting the Right Change: A Retail Strategy for Scotland – March 2022
19 Scotland's National Strategy for Economic Transformation: Published 1 March
2022
Site History
20 15/01808/FLM On 19 February 2015, detailed Planning Permission was
approved, having been sought by the Council, for the formation of a ‘park and
choose’ facility, related access road, landscaping and associated works.
21 18/02232/FLM on 11 March 2020, planning permission was granted (under
Section 42 of the Town and Country Planning (Scotland) Act 1997) to modify
Condition 13 of Planning Permission 15/01808/FLM to allow the delivery of
construction materials for that development on Saturdays between 0800 and
1300 hours.

Page 7

22 21/00001/PAN. A ‘Proposal of Application Notice’ was submitted on 11 February
2021 for a mixed-use development comprising hotel, museum, holiday
accommodation, retail and potential park and ride facility. A report setting out the
details of the PAN was presented to the Planning and Development Management
Committee on the 9 March 2021.
23 21/00684/SCOP. An EIA (Environmental Impact Assessment) Scoping Opinion
was issued by the Council on 20 May 2021, which confirmed the details required
to be included in the Environmental Impact Assessment Report for the
development set out in the subject application.
CONSULTATIONS
As part of the planning application process, the following bodies were consulted: 
External Consultees: 
24 Scottish Water: No objection. Developer to contact Scottish Water to confirm
connection details.
25 Transport Scotland: No objection, subject to conditions. Following the request for
additional information, including the completion of a Stage 1 Road Safety Audit
(being a review of existing infrastructure audit and analysis of traffic / road
accident data for that location) by the applicant, a position of agreement has
been reached to permit the application subject to conditions. In this case,
conditions are recommended to: limit the scale of any retail development onsite;
secure a construction traffic management plan; agree design details regarding
the new A85 Trunk Road site access; secure a signage strategy; secure a travel
plan to reduce private motor vehicle use at the site; secure an external lighting
scheme; the managing of stormwater and dirt or debris on the road network; the
provision of a barrier at the site boundary where it adjoins the trunk road and that
construction material delivery to be sheeted. (Conditions 2, 7, 8, 18, 20, 25 - 29,
34 and 35).
26 Network Rail: No objection in principle, subject to conditions on; fencing,
construction method statement, drainage, landscaping and a noise impact
assessment. Informative notes are also suggested for lighting and construction
limitations. (Conditions 8, 9, 12, 14 and 23).
27 NatureScot: No objection, provided mitigation options including a construction
environmental management plan and the provision of sewer/SUDS systems are
in place to protect the River Tay Special Area of Conservation. (Conditions 6, 8,
11 and 12).
28 Historic Environment Scotland: No objection. No comments to note.
29 Perth and Kinross Heritage Trust: No objection, subject to a condition requiring
archaeological evaluation and related informative notes. (Condition 19).

Page 8

30 Scottish Environment Protection Agency: No objection. No Comments to note.
31 West Carse Community Council: Object. Consider that there would be adverse
transport impacts, road safety implications, the proposals are of an inappropriate
scale and character for the area, the chalet layout is too dense, and the height of
buildings (hotel) is too high.
32 Dundee City Council: No objection. No comment to note. Internal Consultees 
33 Environmental Health (Noise / Odour): No objection, subject to conditions on:
construction noise, noise from operational deliveries and servicing, odour from
cafes / kitchen facilities, and any external lighting. (Conditions 12, 13, 15 - 17). 
34 Transport Planning: No objection, subject to conditions related to, a signage
strategy, parking standards, EV charging details, updating trip rate forecasts and
the provision of a footway along Kinfauns Holdings. (Conditions 29 – 33).
35 Development Plan Team: Object, consider the proposals are contrary to Policies
7, 9, 13 and 14 of the LDP2.
36 Community Greenspace: No objection, subject to conditions requiring an agreed
active travel plan and landscape details, confirming planting of public open
spaces, including the existing core path within the site. (Conditions 8, 21 and 22).
37 Structures and Flooding: No objection, subject to a condition requiring a SUDs
drainage scheme. (Condition 6).
38 Development Contributions Officer: No objection, subject to a condition to secure
developer contributions towards transport infrastructure. (Condition 20). For
clarity, as the optional “park and choose” transport hub discussed throughout this
report does not form part of this application, contributions directly towards its
construction cannot be secured via condition.
39 Biodiversity/Tree Officer: No Objection, following a request for additional
information on the completion of an ecological survey, general agreement on
biodiversity / landscape principles to be incorporated into the design, as well as
confirmation that conditions are applied in relation to these matters and for the
control of any construction impacts. (Conditions 8 - 12).
40 Economic Development: No objection, comments provided to inform this report.
41 Commercial Waste Team: No objection, subject to a condition requiring a Waste
Management Plan and or details/location of bin storage and collection points.
(Condition 24).

Page 9

Representations
42 14 objections were received. Concerns are summarised as follows: 
• Visual impacts: visual amenity / landscape quality
• Overdevelopment and impacts on character of the area
• Loss of open space
• Noise
• Flooding and drainage
• Road safety and traffic congestion
• Over provision of vehicle parking / dependence on private vehicle use
• Impacts on quality of life to residents
• Impacts on ecology and biodiversity
• Loss of employment land
These issues are addressed in the Appraisal section of the report. 
ADDITIONAL STATEMENTS 
Screening Opinion EIA Required
Environmental Impact Assessment
(EIA): Environmental Report Submitted
Appropriate Assessment
Habitats Regulations
Appraisal
(completed/
AA Completed/
AA Not Required
Design Statement or Design and
Access Statement Submitted
Report on Impact or Potential Impact
eg Flood Risk Assessment Submitted/Not Required
POLICY APPRAISAL
The Scottish Planning Policy 2014 (SSP)
Sustainability / Placemaking
43 SPP promotes high quality successful, sustainable, naturally resilient, connected,
and low carbon places. The outcome of development should be that make it
attractive as a location for a tourism focused development. This includes: the
proximity to Perth City Centre, the opportunity to reroute bus services via the site,
which is identified in LDP2, the proposals to include a transport hub, as well as
nearby national cycle routes which could be enhanced by new facilities through
the site and along the River Tay. A key component of the proposals is seen as
the retention and improvement of the existing Core Path (WCAR/119) and, in
turn, the integration of the existing and new path network onsite.

Page 10

44 In terms of supporting business and employment, the planning system should
promote development that increase economic activity whilst safeguarding the
natural and built environment. In addition, due weight should be given to net
economic benefits of proposed development. In the case of this assessment, and
as is expanded upon below, greater weight has been afforded to the economic
benefits of this proposal against negative impacts on amenity and placemaking.
Conditions 8 - 12 have been recommended to avoid and mitigate impacts on the
natural environment. It is considered that appropriate regard has been given to
the economic benefits in this case. 
Managing Flood Risk and Drainage
45 Principally, a precautionary approach to flood risk from all sources is adopted,
taking account of the predicted effects of climate change. In this case, the
development is not located within an identified active flood plain area and, as
such, risks from flooding are low. Whilst surface water is to be managed onsite,
via a SUDs scheme, the Council’s Flood Risk Officer has no specific concerns.
Condition 6 has been recommended to ensure the Council retains control over
design of the SUDs system.
Active Travel
46 The planning system should support patterns of development which; optimise the
use of existing infrastructure, reduce the need to travel, provide safe and
convenient opportunities for walking and cycling for both active travel and
recreation, and facilitate travel by public transport, as well as enabling the
integration of transport modes. In these regards, the development proposed
supports active travel through the retention and enhancement of a core path and
wider cycle networks. Opportunity exists to promote public transport to, and from
the site, through the rerouting of bus services, which may be enhanced further by
a ‘park and choose’ facility. The development, as a tourism offer, is considered to
actively promote transport and active travel. Although a draft Active Travel Plan
(ATP) has been submitted, Condition 21 requires updated and a detailed ATP to
be approved. Condition 26 seeks that the applicant provide further analysis on
ways to reduce the reliance of private motor vehicle dependency to the
development.
Retail Strategy for Scotland: March 2022
47 The ‘Place Principle’ adopted in this recent Scottish Government publication is
one where people, location and resources combine to create a sense of identity
and purpose and is at the heart of addressing the needs and realising the full
potential of communities. Creating communities and places people want to visit,
live and shop in is seen as vital to economic recovery – not only for retail, but for
culture, hospitality and tourism. Where there are actions to support a strong local
retail and cultural destinations, there will be opportunities for other businesses,
such as hospitality and tourism, to capitalise on increased footfall. 20-minute
neighbourhoods are designed to allow people to reach key amenities like shops,

Page 11

services and green spaces by walking, wheeling, cycling or using public
transport. This development offers the opportunity to create a cultural destination
focused on the Motor Museum, near to Perth City Centre, supported by tourist
accommodation along with complementary and associated retail services which
aligns with this policy.
48 Concern is raised by neighbours and the community council that the scale of the
development is too large for this location and that there will be resulting traffic
safety impacts as well as general impacts on local amenity. Regarding amenity, it
is accepted that the open nature of this site will result in visual change. However,
it is considered that the impact of this can be mitigated through conditions
controlling design, scale, size, and landscaping. This is discussed in more detail
below. It is also noted that, as an ‘in principle’ application, the Council is unable
to control, beyond which ‘use class’ is permitted, which operators will occupy
each aspect of the development. The applicant has sought to confirm the types
of retail anticipated for this location, and it is their intention to support tourism and
office activities on site, such as a cafe, restaurant, bakery, cycle repair shop, and
small ancillary stores. To ensure that large scale retail services do not encroach
into this development in the future, a condition is recommended limiting the scale
of each unit to no more than 200m2, and a total retail floorspace to 750m2.
(Conditions 1 and 2). By comparison, the typical local convenience store usually
occupies 300m2.
National Strategy for Economic Transformation: March 2022
49 The Scottish Government launched its National Strategy for Economic
Transformation earlier this year, with the aim of creating a well-being economy: a
society that is thriving across economic, social, and environmental dimensions,
and that delivers prosperity for all Scotland's people and places. They aim to
achieve this while respecting environmental limits embodied by climate and
nature targets. Whilst creating this vision to increase investment and increase
productivity, there is the reality of severe pressure on businesses in the past two
years and a particularly difficult environment for the tourism industry. According
to the Scottish Tourism Emergency Response Group, Scottish tourism is facing
its biggest challenge ever. The proposals in this application look to respond to
this challenge and address the vision to enhance economic activities in the area.
The project proposal seeks to attract inward investment, create new job
opportunities, encourage economic investment in rural areas, and provide social
and cultural benefits to residents and visitors. The submission also outlines the
capacity to support significant construction jobs over three years. The impact of
the construction cost is modelled at £32.2 million, which equates to 85 full-time
equivalents (FTE) on and off-site construction jobs during the construction phase.
The economic assessment suggests that 115 net additional FTE positions could
be generated each year across the wider impact area during the construction
period, inclusive of 65 jobs in the local area.

Page 12

TAYplan Strategic Development Plan 2016-2036 
Policy 1 Locational Priorities
50 Strategies, plans and programmes require to focus the majority of development
towards settlements, followed by land along the edge of principle settlements.
Where located outside of a principal settlement, the outcomes must meet the
needs of the local community and not undermine regeneration of the cities. In
this regard, the proposals are located at the edge of the settlement area of Perth
and, therefore, should only be supported where it does not undermine existing
regeneration and contributes to the outcomes of the plan. In principle, this means
that the development should not seek to create suburbanisation of the
countryside and unsustainable patterns of travel. In this case, the development,
whilst of ‘major’ scale is indicated to continue to see large areas of open space,
coupled with active travel paths and significant landscaping which will mitigate
any perceived urbanisation. Changes to bus routes and improved cycle networks
would seek to promote active travel from the site, although it is noted that
significant elements of the development seek to facilitate vehicle use, as
expected in the peripheral location and nearby roads infrastructure. The climate
impacts of this are to be reduced through encouraging less impactful modes of
transport via: EV (Electric Vehicle) Charging points, along with a wider active
travel plan to encourage other forms of travel once guests arrive. (Conditions 1,
2, 8, 21, 26, 31).
Policy 2 Shaping Better Quality Places
51 Better quality places should, by design, be; place led, promote health, be future
ready and efficient in terms of resource consumption. In this case, the
development in terms of the indicative layout and design seeks to focus large
amounts of the built development within the northern section of the site, to
minimise visual bulk in a landscape setting and enhances and preserves the
natural open space towards the Tay. The development is not located within a
flood plain area and, by design, will incorporate a SUDs scheme which both
promotes resilience and open space. (Condition 6).
Policy 3 A First Choice for Investment
52 A first choice for investment means safeguarding 5 years’ supply of employment
land and further assisting with the growth of a year-round economy. The central
part of the site, occupying land around the existing office building and parking
area, is identified in LDP2 as safeguarded employment land. The existing office
building and parking is to be retained, but part of that allocation is where the
museum and supportive retail are proposed. Whilst these facilities promote
employment opportunities, the uses proposed were not intended/planned at this
allocation and as such they do not accord with Policy 3. The applicant is of the
view that the land is currently underutilised, and the museum presents an
opportunity for an alternative, yet compatible, use. However, there is no evidence
that this land has been marketed for employment-based use and as such the

Page 13

basis for the land being underutilised cannot by verified. Notwithstanding, the
development presents a significant investment opportunity for the Perth area
and, whilst the development will result in the loss of some employment land (c.4
hectares), the proposed uses are, in this case, compatible with the overall
development intentions for the site and would provide employment opportunities.
Policy 5 Town Centre First
53 The town centre first approach seeks to protect and enhance the vitality, viability
and vibrancy of town centres. The Development Plan Team has objected on the
basis that the scale of the retail element proposed in the application could
adversely impact on and compete with Perth City Centre. However, the Council’s
Economic Development Team has considered these matters in more detail and,
based on the size of the retail elements proposed, it is their view that that the use
will primarily be from a localised catchment, specifically the hotel, holiday chalet
and museum users. Having regard to any potential impacts on Perth Town
Centre, the Economic Development Team have also agreed with the conclusions
of the Environmental Impact Assessment Report (EIAR) provided by the
applicant. This states that “should any retail offer be used in the future by retail
outlets not directly linked to the primary use of the site as proposed, the
hypothetical ‘worst-case’ scenario, even if 100% of the estimated turnover of the
Proposed Scheme (£4.38 million, including Food and Beverage turnover)
displaced Perth city centre turnover (£271million, not including Food and
Beverage turnover), this would equate to an anticipated maximum impact of
1.6% on Perth city centre in 2026. To further mitigate any potential impacts on
Perth city centre and to restrict the proposed retail elements of this development
to a proportionately reasonable size, ancillary to the primary use as proposed,
condition 2 is recommended restricting the floor area of each unit to no more
than 200 m2 and a maximum total size of 750m2.
Policy 6 Developer Contributions
54 To ensure suitable infrastructure is in place to facilitate new development, local
development plans should set out a policy framework for seeking developer
contributions. Condition 20 has been recommended to ensure appropriate
contributions are provided with respect to transport infrastructure.
Policy 8 Green Networks
55 The development site is positioned within the TAYplan green network between
Perth and Dundee. The development is not seeking to remove significant
vegetation and has sought to provide a biodiversity strategy which sets out broad
aims for the delivery of ecological values for this site. The development also
further proposes enhancement of the existing core path by the Tay with further
path connections.

Page 14

Perth and Kinross Local Development Plan 2
56 The proposed development represents a significant departure from the Local
Development Plan 2, being contrary to a number of individual policies, and the
degree of departure from their intents. However, the application assessment
concludes that, although contrary to these policies, material planning
considerations, namely the economic benefits of the proposal, along with a
number of recommended conditions to control design, layout, scale and
landscaping, outweigh the development plan and justify a recommendation of
approval.
57 The following key LDP policies are applicable and are considered in detail below.
Policy 1 Placemaking
58 (a) Create a sense of identity by developing a coherent structure of streets,
spaces, and buildings, safely accessible from its surroundings. 
59 Although no detailed design information has been submitted for consideration,
the project is to be brought forward for development in a coordinated manner
which will both create a destination identity to the site and afford safe access
from the A85 Trunk Road and the Kinfauns Public Road. Conditions 25 - 35 have
been recommended regarding road and transport safety matters, as well as EV
charge points, trip generation and footpath construction.
60 (b) Consider and respect site topography and any surrounding important
landmarks, views or skylines, as well as the wider landscape character of the
area.
61 In terms of design and layout, the applicant has considered those important
views across the development site towards Kinnoull Hill from the south-west and
approach over the M90 over bridge. This is discussed in paragraph 64 below.
The greatest massing within the development relates to the hotel and the
museum/retail building. Neither of these developments will skyline from any
significant viewpoints and, although they will be visible on the approach towards
the site, they will also be extensively backdropped against Kinnoull Hill and relate
to the existing large office building. Conditions 1 – 6 are recommended to ensure
the Council retains control over design, layout and location of any future
development.
62 (c) The design and density should complement its surroundings in terms of
appearance, height, scale, massing, materials, finishes and colours.
63 Although these matters are addressed through conditions 1 - 6, the applicant has
incorporated some design considerations in terms of the proposed layout to seek
to minimise visual bulk. These include the integration of the retail facilities to
within the museum building and retaining this building within the northern most
area, where it is contained from the settlement of Walnut Grove by established

Page 15

vegetation. Concern is raised by objectors at the scale of development, in
particular the number and density of the accommodation lodges. Although the
recommended conditions do not seek to reduce the number of lodges, limits
regarding minimum separation distance between units and a separation from
external boundaries has been recommended (Condition 4) to assist integration
into the landscape. Notwithstanding, it is acknowledged that the application for
this development is in principle only and the final design, density and layout can
only be considered following submission of future applications.
64 (d) An existing building line where appropriate or establish one where none
exists. Access, uses, and orientation of principal elevations should reinforce the
street or open space.
65 Many of the proposed buildings will be at the northern part of the site, thereby
enhancing open space to the south by the Tay. This not only groups buildings to
existing developed areas but also seeks to provide an opportunity for
biodiversity, open space and path connections, particularly within the southern
area. 
66 (e) All buildings, streets, and spaces (including green spaces) should create 
safe, accessible, inclusive places for people, which are easily navigable, 
particularly on foot, bicycle and public transport.
67 An active travel plan has been provided and will be incorporated into the
development. However, following detail design, conditions 21 and 26 are
recommended to ensure that active travel and a reduced reliance on private
motor vehicle travel to the site is reflected in the future vision for this
development.
68 (f) Buildings and spaces should be designed with future adaptability, climate
change and resource efficiency in mind wherever possible.
69 Condition 5 is recommended to ensure the finalised design incorporates these
values. This will ensure the Council retains some control and further
consideration into the design.
70 (g) Existing buildings, structures and natural features that contribute to the local
townscape should be retained and sensitively integrated into proposals.
71 The existing office building is to be retained and supported by the proposed
development seeking to provide support services and further employment at this
location.
Policy 7: Employment & Mixed-Use Areas
72 (a) Proposals should not detract from the amenity of adjoining places, especially
residential areas.

Page 16

73 In this respect, part of the site, including the existing office building, carpark and
immediate surrounding space, is safeguarded for employment purposes. The
retention of the existing office headquarters within the development as proposed,
which offers considerable office space, meets the intention of the above
objective. However, the museum and retail elements are also sited within this
safeguarded area. Whilst the development presents an opportunity to diversify
potential uses for this allocation, this proposal is a significant move away from
the general employment opportunities anticipated in these areas. Policy 7
specifically states that retail, principally for visiting members of the public, should
not be encouraged in these areas. Furthermore, museums generally fall under
the ‘Town Centre First’ principle. However, the proposed museum is stated as
being for motor vehicles and transport, and this requires space unlikely to be
available in an urban area. Concerns have been raised by objectors that the
development will detract from the amenity of Walnut Grove. However, whist the
scale of the development is significant, it is considered that concerns regarding
amenity can be addressed by good design, and this is sought to be controlled
through conditions 1, 2, 4 and 8. However, and notwithstanding this point, whilst
there may be some impacts to existing amenity, these would not be to an extent
that they could not be mitigated to an acceptable level. In addition, the economic
benefits of the proposals are considered to justify those impacts identified. 
74 (b) The local road network and connections to the national road network must be
suitable for the traffic generated by the proposals.
75 (c) There should be good walking, cycling and public transport links to new
employment generating uses.
76 An active travel plan has been submitted which demonstrates the capacity to
connect into an existing core path. It is suggested that minor bus rerouting and
improvements in links along the Tay would further enhance the delivery of active
travel options to this location. Review of the ATP and Travel Plans will be
required following detailed design and is sought through Conditions 21 and 26.
77 (d) Proposals for retail uses in employment areas will not be acceptable unless
they are ancillary to an acceptable use on the site.
78 The development does not conform with this part of Policy 7 as the scale of retail
proposed by this development is not considered ancillary to the museum or hotel
use and must instead be considered a separate component to the development.
The applicant considers that the uses proposed will be ancillary and support the
main tourism development proposed. However, the Council cannot control the
future users of these retail spaces, thus, to ensure that it remains an ancillary
and subservient support offering, Condition 2 is recommended to limit the total
floor area, as well as the floor area of each unit to no more than 200 square
metres and an overall maximum floor space of 750m2.

Page 17

79 (e) Proposals for service facilities (should exclude retail and commercial facilities
over 100 m2) and should serve the business and industrial area rather than draw
outside trade and cumulatively should not equal more than 15% of the allocated
employment area.
80 The retail development of this proposal will total 750 square metres in area and
may seek to service the wider residential location, contrary to this aspect of
policy 7. Whilst the applicant has sought to clarify that the retail elements are
specifically aimed at servicing the museum, hotel and holiday chalet lodge guests
/ visitors in the first instance, the need for convenience goods and services may
seek to have an unintended benefit of also serving both the existing office and
residents of Walnut Grove. Condition 2 seeks to retain control over the scale and
use class of development able to occupy this proposed retail space, specifically
Class 1 (Shops) and Class 3 (Food and Drink) only will be permitted. However, if
this development is implemented no control is held by the Council as to what
retail / hot food and drink outlets occupy the approved premises. Whilst objection
is not specifically raised as to the type of retail use, concerns have been noted
regarding traffic congestion, road safety and overall impacts to the visual
amenity. It is, therefore, implicit that a large retail store occupying this space
would potentially add to a greater number of trips to the site and may adversely
impact amenity, a matter sought to be controlled by this policy. Whilst condition 2
does not restrict the type of retail offered, a maximum floor area of 200m2 for
each individual unit is specified. This will mean that only small shops (such as
those defined by HMRC as a small business) can occupy this space. In
conjunction with conditions 13 and 15 (Noise), and Conditions 26 and 32 (Trip
Generation), the impacts on amenity relating to retail use can be appropriately
mitigated.
81 (f) Proposals for waste management facilities are considered to be acceptable
subject to detailed site-specific considerations.
82 Condition 24 seeks to require a waste management plan to be submitted as part
of any detailed design or application for approval of matters specified by
conditions.
83 (g) Proposals should not result in adverse effects, either individually or in
combination, on the integrity of any European designated sites. Applications shall
be supported by sufficient information to allow the Council to conclude that there
would be no such adverse effects.
84 NatureScot, in its review of the application, did not raise any concerns with
respect to impacts on the Tay, subject to the implementation of safeguarding
measures. These have been implemented through conditions 8 – 12.

Page 18

Policy 9: Caravan Sites, Chalets & Timeshare Developments
85 Proposals for new or expanded sites for holiday-related uses will be supported
where the proposals are compatible with Policy 1: Placemaking.
86 The proposed development is seeking permission for up to 52 accommodation
lodges for use by longer stay guests (over 5 days). This aspect of the
development does not fully meet Policy 1 in terms of its design and density, given
the scale of development in contrast to the size of the neighbouring plots and the
overall building mass proposed. This is a concern raised by objectors and the
Council’s Development Plan Team and is discussed above. The applicant has
sought to address these matters by setting out that the design and layout of the
holiday lodges is not finalised. Being subject to further examination in conjunction
with design of the access, parking, servicing, drainage and landscape provisions,
the proximity of holiday lodges to the eastern site boundary remains a valid
concern. A landscape and biodiversity strategy has been provided, setting out
mitigation options. However, any landscaping takes time to establish. To seek to
immediately mitigate some of the concerns raised by objectors, condition 4 is
recommended. This will seek to ensure the holiday chalets are well separated
from one another and neighbouring boundaries. This will afford a visual setback,
whilst landscaping is established and will also promote openness and reduce the
layout density. Condition 5 and other conditions such as those relating to access,
parking and active travel through the site will need to be considered as a whole in
the design and layout. Whilst the development overall will cause some impacts to
landscape character, it is considered that, with the conditions recommended,
appropriate mitigation is offered to minimise those impacts on direct neighbours.
Furthermore, and principle to the assessment of this report, it is considered that
the positive economic impacts of this development are a material planning
consideration and serve to outweigh the development plan in this case.
Policy 13: Retail and Commercial Leisure Proposals
87 The location for any use that generates a significant footfall should follow a
sequential approach in which locations for such development are considered in
the following order: 
(a) city or town centre;
(b) edge of city or town centre;
(c) other commercial centres identified in the Development Plan;
(d) out of centre locations that are, or can be made, easily accessible by a
choice of transport modes.
88 The proposal is contrary to this policy as the size of the retail space proposed
(1,000 square metres) cannot be considered ancillary to the museum facility.
Whilst the principal set out in the indicative design, which integrates retail within
the museum building, is acceptable, the scale of the retail element is
disproportionate to reasonable ancillary requirements of the museum, hotel and
holiday lodge. Though some clarification on the types of complementary retail

Page 19

types envisaged has been provided, the scale is such that it must be considered
a separate and distinct aspect of the proposal. In this sense, locations for retail
proposals must undertake a sequential approach in considering an appropriate
location, the sequence identifying city or town centres as the preferable option,
with ‘out of centre’ locations as the least preferable. Kinfauns is on the edge of
Perth but is identified as a separate settlement within LDP2. The applicant,
through its Environmental Impact Assessment Report , has provided a socio-
economic assessment of the development. This has been reviewed by the
Council’s Enterprise Team who have confirmed a broad agreement with the
conclusions. That is, based on the location and size of units, the retail aspect
would primarily seek to support a local market. In order to retain control over the
scale of retail operating from this site (in line with the conclusions of the
Enterprise team), Condition 2 has been recommended to limit the floor space
(750m2 in total) and overall size of individual units (200m2) Having regard to the
site accessibility, the development will be easily accessible by public transport,
subject to minor changes in bus services. No objections are raised by with the
Council’s Transport Planning Team or Transport Scotland, subject to the above
restrictions by condition 2. 
Policy 14A: Open Space Retention & Provision
89 The proposal seeks to locate a considerable number of accommodation lodges /
chalet units on, and within, designated open space. The indicative design is such
that the lodges will occupy, and could dominate, the open space area, thereby
seeking to discourage public access.
90 (a) Where the site is principally used as a recreation resource, the proposed
development is ancillary to the principal use of the site as a recreational
resource. 
91 The local Development Plan lists this open space area as having landscape
value rather than being as a recreational resource.
92 (b) The proposed development involves a minor part of the site which would not
affect its continued use as a recreational or amenity resource.
93 The accommodation lodges and hotel, shown on the indicative layout presented,
occupy approximately half of this open space designation, with the balance to
form recreational space (such as paths and landscaping) as well as the SUDs /
wildlife pond. Notwithstanding that this indicative layout is still subject to detailed
design work, controlled through conditions, it is considered that large parts of the
site would remain open for passive amenity purposes, whereby views could still
be maintained through, and over, the development site. This will help to maintain
its existing value. Having regard to the conclusions and recommendations noted
in paragraph 88 above, it is considered that, with appropriate landscaping and
conditions regarding siting and design of all built development, the impacts on
landscape and wider amenity can be mitigated.

Page 20

94 (c) In the case of proposals involving the loss of a recreational facility, the facility
which would be lost would be replaced by provision of one of comparable or
greater benefit and in a location which is convenient for its users, or by the
upgrading of an existing provision to provide a better quality facility, either within
the same site, or at another location which is convenient for its users.
95 (d) Where a proposal would involve the loss of a sports pitch, a playing field
strategy prepared in consultation with sportscotland has demonstrated that there
is a clear excess of sports pitches to meet current and anticipated future demand
in the area, and that the site could be developed without detriment to the overall
quality of provision.
96 Having regard to items (c) and (d) of this policy, the development is not a
recreational and/or sports pitch and, as such, those provisions are not relevant to
this assessment.
Design and Layout
97 As a Planning Permission in Principle application, only limited detailed
consideration can be given to site layout and design. However, the key design
considerations to this development have been; 1) the integration of the retail
facilities to within the museum building in order to reduce overall bulk and mass
onsite, 2) to keep as much building mass to within the safeguarded employment
area, which would also allow screening from existing established vegetation, 3)
to position the hotel so that it relates to the front façade of the existing office
building and to have its gable end onto the main public road/ M90 Bridge. This
will have the added benefit of helping to minimise visual bulk when viewed
against the natural backdrop of Kinnoull Hill. In terms of the lodges, their
arrangement is considered in relation to access, parking, drainage designs for
the wider proposals and the position of the core path passing the site. 
98 Review of the design concepts presented initially saw Council Officers raise
concern that the level of detail presented did not provide enough assurance or
confidence that, although contrary to LDP2, the site would provide a good area of
open space whilst being attractive for visitors and benefiting the community.
However, in this case consideration has also be given to the limited use of the
site as it is now, and that a Transport Museum requires space, something which
was unlikely to be available within a city centre location. Accordingly, this
particular type of development is considered a positive opportunity. Coupled with
the economic benefits the development could bring and conditions to control the
scale, design, landscaping and any construction related impacts, it is considered
that, on balance, the principle of much of the primary elements of the
development are acceptable for this location.
Landscape and Visual Amenity
99 Concern is raised by objectors that the proposal overly develops the site and is
not of a scale or character suited to this peripheral location. In these respects, it

Page 21

is recognised that, given the relatively open and flat nature of the site, there is
limited opportunity to use vegetation and/or topography in which to incorporate a
design to be significantly absorbed within the landscape. As such, the proposed
development presents challenges in terms of visual impact and appearance.
However, as noted above, design considerations have sought to address the
concerns raised. In combination with conditions to guide and retain further control
over the development within the design phase, it is considered that a number of
the concerns raised can be mitigated.
100 In terms of landscape mitigation, a detailed planting scheme has not been
provided with this application, as only the principles rather than details are being
assessed. However, it is considered that a suitable scheme can be developed,
incorporated into the design, and presented through a further application. This
matter is addressed through condition 2.9. Concern has been raised in relation to
the lack of detail, as it offers less confidence and assurance that the
development can successfully integrate into the landscape. However, the
applicant has sought to address this by providing an ecological site appraisal and
a set of landscape and biodiversity principles to be adopted in implementing the
development. A position is presented that, with the adoption of these principles,
and further landscaping details to be provided through conditions, the
development can successfully integrate into its surroundings. Whilst landscaping
will take time to establish, it is considered that this presents appropriate
mitigation in this case. Conditions 4, 6, 8 - 12 and 13 have been recommended
below to address the concerns raised.
Roads and Access
101 The indicative plans propose three access points to the public road network, 1) a
new service entrance for the museum and retail elements opposite numbers 1
and 3 Kinfauns Holdings; 2) the luxury lodges propose use of the existing vehicle
access opposite Mesa Verde, Kinfauns Holdings, this also serves Caledonian
House; and 3) the hotel entrance and drop off location, public parking area and
retail elements of the development will be accessed directly via a new junction
from the A85 Trunk Road. Full details are illustrated in drawings provided with
the application.
Parking
102 The Transport Assessment details sufficient space to comply with the relevant
National Roads Development Guide parking standards, which is acceptable for
the museum and hotel elements. The applicant has advised that the retail
elements are considered ‘linked’ rather than separate trips. However, at this
stage, very limited details have been provided on the retail element and this
detail may well impact on traffic generation. As such, further clarity will be
required at the matters specified by condition stage. For each chalet, a minimum
of two car parking spaces will be provided. Coach Parking shall also be
considered and potentially coach EV facilities.

Page 22

Vehicle Access
103 The existing site vehicle entrance to serve the holiday chalets and office building
is considered to be of an acceptable standard. The two new vehicle access
points to be created (one for the museum and retail servicing with a second to
serve the hotel), will be required to meet necessary engineered standards.
Transport Planning have confirmed that the appropriate visibility splays can be
provided and the detailed design of these accesses shall follow at a later stage.
Public Transport
104 An existing bus stop on Dundee Road is served by over 35 buses daily, from
05:04 until 00:29hrs. These services have routes to Perth, Dundee, Edinburgh,
Kinross, Ingliston, Edinburgh Zoo and the Carse of Gowrie. An electric bus,
operated by Ember, has the potential to link to a number of other tourist
attractions and museums. At this stage, it is not possible to confirm if any of the
services will divert into the site, but discussions to explore this are likely to take
place at a later stage. The application indicates that buses will be able to access
and egress the site. These discussions will help inform the location of bus
infrastructure.
Walking and Cycling
105 The application also indicates the development will provide links into wider path
networks, creating permeability through the site for walking and cycling, thus
encouraging active travel. A new footway is to be provided along the northern
boundary, to the east of the existing Caledonian House entrance, which it is
anticipated will connect with the Ogilvie Homes development (Ref 20/00359/FLL)
to the immediate east.
Trip Generation
106 The approach used to model trip generation is acceptable to both the Council’s
Transport Planning Team and Transport Scotland. The modelling report,
(discussed in more detail within the Transport Planning Response), shows
journey times along Dundee Road from the Toll House to Queen’s Bridge
southbound would see minimal impact between AM and PM. Northbound use
would see the journey times similar between all three of the modelled scenarios
used. The queue lengths also show little difference between AM and PM.
Between the A85 Barnhill and the existing vehicle entrance to Caledonian House,
there will be a slight increase in vehicle flows along Kinfauns Holdings. However,
Transport Planning colleagues do not see this as a concern, as there is capacity
to accommodate the increase.
Street Lighting
107 New roads will be subject to a Road Construction Consent which will consider
the position of lighting columns. Future detailed applications should also consider

Page 23

if any alterations are required to existing streetlighting. These matters are
addressed through recommended Conditions 1 and 18.
Signing Strategy
108 The applicant has advised that the lodges will be signed from the A85 Trunk
Road. Given Kinfauns Holdings can be accessed from the Trunk Road Network
at two locations, Perth & Kinross Council would be involved in the discussions to
limit the amount of traffic using the eastern side of Kinfauns Holdings to access
the site. Condition 29 is recommended regarding a signage strategy.
Park & Choose Site
109 Planning Permission has previously been approved for part of this site
(Reference: 18/02232/FLM) for the development of a Park and Choose facility,
which was a Council led proposal. However, the Council does not own this land,
which is primarily under the ownership of the applicant. As a result, the Council
had no legal mechanism in place to implement the planning permission until
agreement is reached with the relevant landowner(s). The proposals that are the
subject of this report indicate an area identified by the applicant, as shown within
the indicative site layout (drawing 03), for a Park and Choose facility. The Council
will secure the transfer of the land for the delivery of this facility as part of the
current application by entering into a section 75 legal agreement with the
applicant. Conditional control (condition 36) will also ensure that the development
is delivered within an acceptable timeframe together with the Park and Choose
facility. Since the submission of this application, the Council has agreed a budget
to enable a business case for capital investment to be prepared for Members’
consideration.
Trunk Road Impacts
110 Following the provision of further information, including a road safety audit,
Transport Scotland has withdrawn any objection to the development, subject to a
number of conditions and restrictions on any development being progressed.
Matters covered by conditions include the scale of retail development, signage,
access formation, external lighting, stormwater, construction traffic management,
vehicle wheel cleaning, protection barriers and means of travel to and from the
site. (Conditions 2, 7, 18, 25 – 29, 33, 34 and 35). The breadth and number of
conditions recommended reflects a lack of detailed design detail at this time. 
Drainage and Flooding and Pollution Prevention 
Flooding
111 The flood risk and drainage assessment supporting the application has been
reviewed by SEPA as well as the Council’s Structures and Flooding Team, both
of whom do not object. The site is not shown to be at risk from fluvial or coastal
flood sources and is set well above the Coastal Flood Boundary 200-year level of

Page 24

4.57m and the 1000-yr level of 4.74m Above Ordinance Datum (AOD).
Wastewater Drainage
112 Wastewater services for this development have been proposed as being private
systems, including three individual package plants, serving the separate aspects
of the development (i.e the hotel, the museum and the holiday chalets). If brought
forward, each would need its own licence, likely two Complex Licences under
The Water Environment (Controlled Activities) (Scotland) Regulations 2011
(CAR). These matters fall within the remit of SEPA.
Surface Water Drainage
113 The Council’s Flood Risk Officer has reviewed the application and raised no
concerns, subject to a condition regarding further review of the detailed SUDs
drainage scheme design. It is advised that arrangements should follow the
approach set out in the CIRIA SUDS Manual (C753) and ensure the surface
water management proposals comply with CAR General Binding Rules (GBR) 10
and 11.
114 In terms of construction related impacts, those matters are to be addressed
through the implementation of a construction method statement referred to in
conditions 6 and 20.
Waste Collection
115 No information has been submitted regarding waste collection, although PKC’s
Public Waste Operator has raised no objection, subject to a condition to secure a
waste management strategy and / or details to confirm waste management
onsite. Condition 24 is recommended to this effect. 
Natural Heritage and Biodiversity
116 In their consultation response of May 2021, NatureScot stated that the Council
will require to consider the effects of the proposal on the River Tay Special Area
of Conservation (SAC). In this regard, based on the location of the development
in relation to the SAC, the risk of direct disturbance is considered very low.
Furthermore, as per the Drainage Impact Assessment and Chapter 9 of the
Environmental Impact Assessment Report, the residual risk to surface water
during construction is minor, due to limited connectivity (no open water courses
running through the site) and physical separation distance from the Tay margins.
Any SUDs system (discussed above) will provide adequate storage and flow
attenuation as well as enhanced water quality management and amenity value,
before discharging to an existing private combined sewer network. As such, the
residual risk during operation is also considered to be low. Overall, the risk of
Likely Significant Effects upon the River Tay SAC is low, subject to conditions 8 -
12.

Page 25

117 In terms of biodiversity and habitat, a full landscape scheme plan will be provided
at detailed application stage. However, in recognition of concerns raised both by
the Council’s Biodiversity Officer and through representations, a landscape and
biodiversity strategy has been prepared and this is supportive of the application.
Having reviewed the strategy, the principles it sets out are accepted and
conditions 10 and 11 are recommended.
Archaeology
118 No objection is raised by either Historic Environment Scotland or Perth and 
Kinross Heritage Trust, subject to the inclusion of a condition relating to 
archaeological works methodology. Condition 19 is recommended.
Developer Contributions
119 No objection to the development is raised, subject to a planning condition to
secure developer contributions related to transport infrastructure (Condition 20).
The proposal is thus considered to be in accordance with the Council's policy on
Developer Contributions and related Affordable Housing Supplementary
Guidance 2020.
Economic Impact
120 Chapter 11 of the EIAR sets out the socio-economic impacts from the
development. The assessment methodology considers; employment generated
during the construction phase, employment generated during the operational
phase, visitor expenditure, open space and impacts on existing retail provision.
121 Based on estimated construction costs, modelled as of 2021 at £32.2 million, and
a build period of 3 years, the project is predicted to create on average 85 full-time
equivalent (FTE) construction jobs. Accounting for some displacement (i.e., in the
absence of this development, workers might otherwise be employed on other
construction projects), the number of direct jobs supported is 65 FTEs of which
50 are projected to be taken by residents within Perth and Kinross. The benefits
in terms of direct construction employment will also extend to indirect benefits
such as construction materials and goods and services purchased locally. It is
estimated that construction will support an additional 50 FTEs in the wider impact
area as part of the supply chain, of which 15 are predicted to be from within Perth
and Kinross. The net employment impact finds that 115 FTE positions could be
generated of a wider impact setting, with 65 FTEs from within Perth and Kinross.
122 Based on the mixed-use nature of the development as proposed, it is estimated
to generate 125 net FTEs once complete and occupied. This is based on 60 FTE
associated with the hotel, 45 connected with the retail sector, 15 museum staff
and 10 staff to manage the holiday chalets. Again, accounting for displacement,
80 of those FTEs generated will be within Perth and Kinross. It is further
estimated that 25 FTEs will also be generated indirectly through the supply chain.

Page 26

123 In terms of visitor expenditure, based on a room occupancy rate of 66% (in line
with figures from 2019 for Perthshire), it is estimated that the proposed
accommodation (both the hotel and holiday chalets), could accommodate 80,970
visitor nights per year. Estimating a spend of £80 per night (Visit Scotland data),
this equates to a gross annual expenditure of £6 million per year. Accounting for
expenditure elsewhere, it is estimated that £4.3 million net additional expenditure
will be generated within Perth and Kinross.
124 Impacts on the existing retail sector within Perth city centre have already been
discussed, with it being demonstrated that the proposed development is
estimated to equate to only 1.6 % of the total retail turnover for the city centre by
2026. Therefore, any direct impacts are considered negligible and addressed by
Conditions 1 and 2. The Council’s Economic Development team has reviewed
those values along with the employment assessments details above and not
raised any concern with the methodology or assessment undertaken. They state
that the development proposed represents considerable private investment within
Perth and Kinross which is to be encouraged. The positive economic benefits,
along with enhancements to the tourism offer and opportunities for Perth are
considered a significant material consideration and outweigh the departures from
the development plan, particularly with regard to adverse impacts to allocated
land use, changes in amenity and landscape setting.
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS
125 It is recommended this application be approved subject to a Section 75 Legal
agreement to secure any land transfer for the delivery of a Park and Choose
Transport Hub within part of this site.
CONCLUSION AND REASONS FOR RECOMMENDATION
126 In conclusion, this development is a significant departure from LDP2. The
specific conflicts which raise the greatest concerns are in respect of policies
pertaining to placemaking, the provision and scale of retail within the
development proposed and the loss of open space. Recommended conditions
will afford some mitigation by retaining control over the scale, from and layout of
the development and in particular the scale of retail provision adopted, whilst also
securing landscaping. When such conditions are considered alongside the
economic benefits of this development, including; job creation, investment in
Perth, and an increase in tourism to the area, it is considered there is sufficient
justification to permit the development, contrary to the provisions of the adopted
development plan.

Page 27

RECOMMENDATION
Conditions and Reasons for Recommendation
Approval of Matters
1.  The development shall not commence until the following specified matters
have been the subject of a formal planning application for the approval of the 
Council as Planning Authority: the siting, design and external appearance of all 
built aspects of the development, all hard and soft landscaping of the site, all 
means of enclosure, means of access to the site, vehicle parking and turning 
facilities, levels, drainage and waste management provision.
Reason: This is a Planning Permission in Principle under Section 59 of the Town 
and Country Planning (Scotland) Act 1997 as amended by Section 21 of the 
Planning etc. (Scotland) Act 2006.
2. The following use classes are hereby approved within the development and
shall not exceed: 
a. Class 1 (shops) and Class 3 (Food and Drink) with a maximum combined
floor space of 750 square metres (m2), with no single unit in excess of
200m2. In addition, each unit shall be physically conjoined to one of the
other approved uses/buildings, and in the case of the Hotel or Museum
have interconnectivity between the primary building/use, so as to allow
access by patrons internally,
b. Class 7 (Hotel) with a maximum number of rooms being 150,
c. Class 7 (Holiday Chalets) with a maximum number of 50 individual units,
each of a maximum floor area not exceeding 85 square metres (m2),
d. Class 10 (Non-residential Institutions – Museum) with a maximum floor area
of 5,500 square metres.
Reason: In order to control the use classes hereby approved, to minimise 
interference with the safety and free flow of traffic on the trunk road, and to 
restrict the scale of authorised retail development.
3. The holiday chalet use hereby approved shall be used solely for holiday
accommodation and shall not be occupied by an individual, persons or family
group for a period exceeding 14 nights. The applicant shall keep a record of 
guests and number of nights stayed in order to demonstrate compliance with this 
condition. This record book shall be made available for inspection upon request 
by the Council as Planning Authority.
Reason: In order to control the use class hereby approved.
4. The design, location and external finishes of the holiday chalets hereby
approved shall be specified in the details submitted and agreed in association to
Condition 1 above. Notwithstanding the details shown on the drawings hereby

Page 28

approved, no permission is granted for the submitted layout or number of units.
The following design parameters shall be complied with in submissions related to
Condition 1: 
a. All holiday chalets shall be a minimum of 25 metres from any external
boundary to the site
b. All holiday chalets shall be a minimum of 8metres from each other
Reason: To protect the amenity of the location and to ensure sufficient open
space within the development.
5. As part of any application for the Approval of Matters Specified by Condition 1
proposing buildings requiring a building warrant, a scheme shall be submitted to,
and approved in writing by, the Council as Planning Authority. This must
demonstrate how at least 10% of the current carbon emissions reduction set by
the Scottish Buildings Standards will be met through the installation and
operation of low and zero-carbon technologies. This scheme shall detail the
following: 
c. the technology types;
d. illustrate, through technical calculations, that these will meet at least the
10% reduction;
e. their siting and location; and
f. ongoing operation and maintenance.
Once approved, the development shall be completed in accordance with the
approved scheme.
Reason: To ensure the proposal complies with Policy 32 of the Local
Development Plan.
Drainage (SUDs)
6. As part of any application for the Approval of Matters Specified by Condition
1, a sustainable urban drainage system (SUDS) shall be submitted for the written
agreement of the Council as Planning Authority, in consultation with the Scottish
Environment Protection Agency (SEPA) where necessary. The scheme shall be
developed in accordance with the technical guidance contained in The
Sustainable Drainage System (SUDS) Manual (C753) and the Council’s Flood
Risk and Flood Risk Assessments Developer Guidance and shall incorporate
source control. All works shall be carried out in accordance with the agreed
scheme and be operational prior to the bringing into use of the development.
Reason: In order to ensure all surface water is adequately managed. 
7. There shall be no drainage connections to the trunk road drainage system.
Reason: To ensure that the efficiency of the existing drainage network is not
affected.

Page 29

Biodiversity and Landscape 
8. As part of any future application for the Approval of Matters Specified by
Condition 1, a landscaping and planting scheme for the relevant areas sought to
be developed, shall be submitted for the written agreement of the Council as
Planning Authority, in consultation Network Rail and the Council’s Biodiversity /
Tree Officer and Community Greenspace team. The scheme shall include details
of the height and slopes of any mounding or recontouring of the site, full details
of all hard landscaping proposals including materials and installation methods
and, species, height, size and density of trees and shrubs to be planted. The
scheme as subsequently approved shall be carried out and completed within the
first available planting season (October to March) after the completion or bringing
into use of the development approved by that application, whichever is the
earlier, and the date of Practical Completion of the landscaping scheme shall be
supplied in writing to the Council as Planning Authority within 7 days of that date.
The scheme as agreed and implemented shall thereafter be maintained to the
satisfaction of the Council as Planning Authority. 
Reason: In the interests of amenity and public safety as well as the protection of 
Network Rail infrastructure. 
9. No trees on the site shall be felled without the prior written agreement of the
Council as Planning Authority. Any application for the Approval of Matters
Specified by Condition 1, where the area proposed to be developed contains or
is bounded by trees which could be affected shall be accompanied by a detailed
tree survey covering that area carried out by a qualified and independent arborist
indicating the type, age, condition, location and accurate canopy spread of all the
trees on and affected by the site and including a tree management report with
details of the tree protection measures to be employed during construction in
accordance with BS 5837 2012: Trees in Relation to Design, Demolition and
Construction.
Reason: To protect the existing trees onsite, to ensure a satisfactory standard of 
development and environmental quality and to reserve the rights of the Planning 
Authority. 
10. The Biodiversity and Landscape Strategy for this site, prepared by Ecus Ltd,
dated March 2022 shall be fully adhered to, being incorporated in the
Construction Method Statement and Landscape Scheme as specified within
Conditions 8 and 12.
Reason: In the interests of amenity and the protection of the River Tay SAC.
11. The mitigation measures set out within the Ecological Impact Assessment,
prepared by Ecus Ltd and dated March 2022 shall be fully adhered to, being 
incorporated in the Construction Method Statement and Landscape Scheme as 
specified within Conditions 8 and 12.

Page 30

Reason: In the interests of biodiversity and the protection of the River Tay 
Special Area of Conservation (SAC). 
Construction
12. The development shall incorporate and not commence until a detailed
Construction Method Statement (CMS) has been submitted to and agreed by the 
Council as Planning Authority, in consultation with NatureScot, Network Rail and 
SEPA as well as the Council’s Biodiversity and Environmental Health Officers. 
The CMS must identify measures to prevent harmful materials entering the River 
Tay SAC, which could reduce water quality and lead to a damaging impact on 
the salmon, otter and lamprey interests. The CMS should include the following: 
1. pollution prevention safeguards including drainage arrangements and the
possible use of siltation traps, settlement tanks and bunds
2. storage and disposal of materials including the siting of stockpiles, use of
buffer strips and disposal methods
3. construction site facilities including extent and location of construction site
huts, vehicles, equipment, fuel, chemicals and materials compound
4. timing, duration and phasing of construction particularly in relation to
salmon and lamprey migration/spawning.
5. a Dust Management Plan (DMP) for the control of dust during construction.
6. noise mitigation measures for the control of noise during construction 
The CMS and mitigations as agreed shall be fully implemented during the
construction phase(s). 
Reason: To protect amenity and the River Tay SAC. 
Noise 
13. The mitigation measures recommended in Section 6.6 of the hereby approved
Noise Impact Assessment, prepared by ITP Energised Ltd dated 17 September
2021 shall be fully implemented to the satisfaction of the Council as Planning
Authority. 
Reason: To ensure that occupants/users of the development do not experience 
undue disturbance arising from nearby noise nuisances and to protect residential 
amenity for neighbours and nearby residents to the development. 
14. Further to the Noise Impact Assessment completed and referred to in condition
13 and as part of any application for the Approval of Matters Specified by
Condition 1, a railway specific noise impact assessment shall be submitted to
and approved in writing by the Planning Authority. This noise impact assessment
shall include an assessment of the potential for occupants of the development to
experience noise nuisance arising from the railway line. Where a potential for
noise disturbance is identified, proposals for the attenuation of that noise shall be
submitted to and approved in writing by the Planning Authority in consultation

Page 31

with Network Rail. Any such approved noise attenuation scheme shall be
implemented prior to the development being brought into use and shall thereafter
be retained in accordance with the approved scheme.
Reason: To ensure that occupants/users of the development do not experience 
undue disturbance arising from nearby railway activities. 
15.  All plant or equipment shall be so enclosed, attenuated and/or maintained such 
that any noise therefrom shall not exceed Noise Rating 35 between 0700 and 
2300 hours daily, or Noise Rating 25 between 2300 and 0700 hours daily, within 
any neighbouring residential property, with all windows slightly open, when 
measured and/ or calculated and plotted on a rating curve chart.
Reason: To ensure that nearby residents of the development do not
experience undue noise disturbance as a result of construction activities. 
16. Servicing of and deliveries to the site for all aspects of the development shall be 
carried out between 0700 and 1900 Monday to Saturday only, with no servicing 
or deliveries permitted on Sundays. 
Reason: To protect residential amenity 
Odour 
17. As part of any application for the Approval of Matters Specified by Condition 1,
where the development proposed incorporates any commercial cooking, the
details of an effective ventilation system, commensurate with the nature and
scale of the commercial cooking to be undertaken, shall be submitted for the
written agreement of the Council as Planning Authority. Prior to the development
being completed or brought into use, the approved system shall be installed and
operated within the commercial areas, such that cooking odours are not 
exhausted into or escape into any neighbouring dwellings. Thereafter the system
shall be maintained.
Reason: To protect the amenity of nearby residents to the development and to 
ensure that occupants/users of the development do not experience any undue 
odour nuisances. 
External Lighting 
18. All external lighting shall be sufficiently screened and aligned so as to ensure that
there is no direct illumination of neighbouring land and that light spillage beyond
the boundaries of the site is minimised to a degree that it does not adversely
affect the amenity of the neighbouring land. Details of the external lighting within
the site where the area proposed to be developed adjoins or may impact the
trunk road shall be submitted for the approval of the Council as Planning

Page 32

Reason: To ensure that there will be no distraction or dazzle to drivers on the 
trunk road and that the safety of the traffic on the trunk road will not be 
diminished and to protect the amenity of nearby residents from light nuisance 
and in the interests of biodiversity to mitigate against wildlife interference from 
the development.
Archaeology 
19. As part of the first application for the Approval of Matters Specified by Condition
1, the developer shall secure the implementation of a programme of
archaeological work in accordance with a written scheme of archaeological
investigation which has been submitted by the applicant and agreed in writing by
the Council as Planning Authority, in consultation with Perth and Kinross
Heritage Trust. This may reflect a phasing programme. Thereafter, the developer
shall ensure that the programme of archaeological works is fully implemented
including that all excavation, preservation, recording, recovery, analysis,
publication and archiving of archaeological resources within the development site
is undertaken. In addition, the developer shall afford access at all reasonable
times to Perth and Kinross Heritage Trust or a nominated representative and
shall allow them to observe work in progress.
Reason: In order to protect the historic environment and to align the development 
with Scottish Planning Policy and Policy 26 of the Perth and Kinross LDP2.
Contributions 
20. The development shall be in accordance with the requirements of Perth &
Kinross Council’s Developer Contributions and Affordable Housing
Supplementary Guidance 2016 in line with Policy 5: Infrastructure Contributions
of the Perth & Kinross Local Development Plan 2 (2019) with regard to transport 
infrastructure, or such subsequent Guidance and Policy which may replace 
these.
Reason: To ensure the development is in accordance with the terms of the Perth 
and Kinross Local Development Plan 2 (2019) and to comply with the Council's 
policy on Developer Contributions and Affordable Housing Supplementary
Guidance 2020. 
Active Travel / Paths 
21. As part of the first application for the Approval of Matters Specified by Condition 
1, an active travel plan shall be prepared and submitted for approval in writing by 
the Council as Planning Authority, in consultation with the Council’s Greenspace 
team.
Reason: In the interests of promote active travel and green infrastructure to and 
from the development.

Page 33

22. As part of the first application for the Approval of Matters Specified by Condition
1, a management plan indicating any temporary diversions and associated
fencing /signage needed to facilitate the development and/or any works proposed
to the right of way/core path as part of the development shall be submitted for the
agreement of the Council as Planning Authority. This plan should demonstrate
the temporary measures which are to be put in place until any formal diversion of
the core path and right of way is approved. The plan, as agreed, shall be
implemented in accordance with the timings identified in the plan.
Reason: To ensure that public access is maintained at all reasonable times, to
the local path network.
Network Rail 
23. As part of the first application for the Approval of Matters Specified by Condition 
1, a Network Rail infrastructure exclusion and management plan shall be
submitted for approval in writing by the Council as Planning Authority, in 
consultation with Network Rail. The management plan shall, as a minimum, 
confirm full details of the location, design and height of a suitable trespass proof 
fence, for the exclusion of any persons from network infrastructure located within 
the site boundary. Details shall also be confirmed for the fence's future  
maintenance and renewal and or any other management of Network Rail 
infrastructure onsite. 
Reason: In order to promote and provide rail safety. 
Waste Management 
24. As part of the first application for the Approval of Matters Specified by Condition 
1, a detailed waste management strategy for this development, confirming any 
waste and recycling facility enclosures or waste and recycling facility storage 
areas and associated locations for bin presentation, shall be submitted for the 
written agreement of the Council as Planning Authority. The duly approved 
scheme shall be implemented prior to the development being brought into use 
and shall thereafter be retained in accordance with the approved scheme.
Reason: To facilitate appropriate waste management within the development. 
Transport and Road Safety 
25. As part of the first application for the Approval of Matters Specified by Condition 
1, the detailed design for the proposed upgraded A 85(T) / site access junction, 
as generally illustrated on Drawing SK01 Revision P1 (dated 06 August 2021) 
and taking account of the recommendations made in the Stage 1 Road Safety 
Audit, shall be submitted to, and approved in writing by, the Council, in
consultation with Transport Scotland, as the trunk roads authority.

Page 34

All works are to be to a standard compliant with DMRB CD 123 (Geometric 
design of at-grade priority and signal-controlled Junctions).
Reason: To minimise interference with the safety and free flow of the traffic on 
the trunk road. 
26. As part of the first application for the Approval of Matters Specified by Condition 
1, a comprehensive Travel Plan that sets out proposals for reducing dependency 
on the private car shall be submitted and approved in writing by the  Council, in 
consultation with Transport Scotland, as the trunk roads authority. The Travel 
Plan shall identify the measures to be implemented, the system of management, 
monitoring, review, reporting and the duration of the plan.
Reason: To be consistent with the requirements of Scottish Planning Policy 
(SPP) and PAN 75 Planning for Transport. 
27. As part of the first application for the Approval of Matters Specified by Condition 
1, details for the design, construction, and ongoing maintenance of a barrier 
along the boundary of the site with the trunk road, shall be submitted and 
approved in writing by the Council, in consultation with Transport Scotland, as       
the trunk roads authority.
Reason: To minimise interference with the safety and free flow of the traffic on 
the trunk road. 
28. As part of any application for the Approval of Matters Specified by Condition 1, a 
Construction Traffic Management Plan (CTMP) has been prepared and approved 
in writing by Perth and Kinross Council, in consultation with Transport Scotland 
as the trunk roads authority.
Reason: To minimise interference with the safety and free flow of the traffic on
the trunk road, to ensure the safety of pedestrians and cyclists using the trunk
road and adjacent facilities, and to be consistent with current guidance and best
practice. 
29. As part of the first application for the Approval of Matters Specified by Condition 
1, a signing strategy that sets out proposals for sign provision on the public road 
network shall be submitted and approved in writing by the Council, in
consultation with Transport Scotland, as the trunk roads authority. The signage 
strategy shall include, and set out, a date for implementation. 
Thereafter, the adopted strategy shall be implemented prior to the development 
being first brought into use.
Reason: In the interests of road safety

Page 35

30. As part of any application for the Approval of Matters Specified by Condition 1, 
where the developer seeks to secure details for any of the holiday chalets   
hereby approved, full parking and access details for those chalets shall be 
demonstrated and agreed by the Council, as Planning Authority, in writing. A 
minimum of two parking spaces per chalet shall be provided.
Reason: To provide a suitable parking provision for the development. 
31. As part of the first application for the Approval of Matters Specified by Condition 
1, the applicant shall provide details of the electric charge points for vehicles to 
be supplied on site, which will be agreed and approved in writing by the Council, 
as Planning Authority.
Reason: To provide a suitable electric charging provision for the development. 
32. As part of any application for the Approval of Matters Specified by Condition 1, 
the applicant shall provide an updated trip rate forecast for the site, in particular 
for the retailing elements of the project, which shall be agreed in writing by the 
Council, as Planning Authority.
Reason: In the interests of road safety 
33. As part of the first application for the Approval of Matters Specified by Condition
1, the developer shall submit a proposal for the consideration and written
approval of the Council, as Planning Authority, for the construction of a footway,
including dropped kerbs, along the frontage of Kinfauns Holdings and/or between
Kinfauns Holdings and Walnut Grove to the west of the site. Thereafter, the
proposed development shall not be occupied until the approved proposals have
been implemented to the satisfaction of the Council, as Planning Authority. In the
event a suitable footway construction cannot be agreed within the site frontage,
offsite works at another location may be agreed with the planning authority in
consultation with the Council’s Transport Planning Team and  delivered in
the above timeframe.
Reason: In the interests of road safety; to ensure an acceptable standard of 
construction within the public road boundary. 
34. The development shall not see groundworks commence until vehicle wheel 
cleansing facilities have been installed and brought into operation on the site, the 
design and siting of which shall be subject to the prior approval of Perth and 
Kinross Council, in consultation with Transport Scotland, as the trunk roads 
authority.
Reason: To ensure that material from the site is not deposited on the trunk road 
to the detriment of road safety. 
35. All vehicles transporting construction material to, and from, the proposed 
development should be sheeted.

Page 36

Reason: To ensure that material from the site is not deposited on the trunk road 
to the detriment of road safety.
36. As part of the first application for the Approval of Matters Specified by Condition 
1, a phasing plan shall be submitted for the written approval of the Council, as 
Planning Authority, which details the delivery of the on-site parking provision and 
its relationship to the Park and Choose facility. The phasing plan shall include 
indications of access between both the on-site parking and the Park and Choose 
facility, and to the public road network, as well as delivery timelines for each 
element.
Reason: To ensure that the development is compatible with the Park and Choose 
facility and includes for delivery programming.
B JUSTIFICATION
The development is considered to be a significant departure from the Local 
Development Plan 2 (2019). However, there are material planning
considerations in this instance which justify an approval recommendation.
C PROCEDURAL NOTES
Permission shall not to be issued until the Section 75 Agreement has been
signed and registered to take account of this application. The legal agreement
should be concluded and completed within 4 months of the date of any
Committee approval. Failure to conclude a legal agreement within 4 months will
result in the planning application being re-assessed through failing to comply with
the associated developer contributions policy and may be ultimately
recommended for refusal under delegated powers.
D INFORMATIVES 
1. An Application for the Approval of Matters Specified in Conditions shall be made 
before the expiration of 3 years from the date of the grant of planning permission 
in principle, unless an earlier application for such approval has been refused or 
an appeal against such refusal has been dismissed. In which case application for 
the approval of all outstanding matters specified in conditions must be made 
within 6 months of the date of such refusal or dismissal. 
2. The approved development shall be commenced no later than the expiration of 3 
years from the date of granting of planning permission in principle or 2 years from 
the final approval of matters specified in conditions, whichever is later. 
3. The developer is advised to contact Perth and Kinross Heritage Trust on 01738 
477080, to discuss terms of reference for work required. This advice is based on 
information held on the Perth and Kinross Historic Environment Record. This 
database of archaeological sites and historic buildings is regularly updated.

Page 37

4. Part of the approved development includes 'caravans', i.e. the ‘chalets’. The 
developer is advised that caravans require to be licensed under the terms of 
Section 1 of the Caravan Sites and Control of Development Act 1960 and   
therefore a licence application should be made to Environmental Health. 
Application forms are available at https://www.pkc.gov.uk/article/15600/Licence- 
caravan-site. 
5. The granting of planning permission does not stop the continued right of public 
access along the existing core path WCAR/119. An order under the Town and 
Country Planning (Scotland) Act 1997, Section 208 or an amendment of the Core  
Path Plan under the Land Reform (Scotland) Act 2003 should be sought in 
advance of any works authorised by this planning permission being commenced. 
All relevant approvals should be in place prior to any stopping up and diversion of  
the core path taking place. 
6. The applicant is advised that any proposed signage will require a further   
application to be submitted for advertisement consent, unless it benefits from 
express consent as per the Town and Country Planning (Control of   
Advertisements) (Scotland) Regulations 1984. 
7. Please be aware that the Planning Permission in Principle may be invalidated by 
the felling of trees which are required to be retained, prior to gaining Approval of 
Matters Reserved by Condition. 
8. The applicant is advised that, in terms of Sections 56 of the Roads (Scotland) Act 
1984, he/she/they must obtain from the Council, as Roads Authority, consent to 
open an existing road or footway prior to the commencement of works.   
Information on junction types, requirements for Vehicular Access consents (VA1) 
and application forms are available at www.pkc.gov.uk/vehicleaccess. 
9. Advice on the disposal of surface water should be sought at the initial stages of 
design from Scottish Water and SEPA. 
10. The applicant is advised that the granting of planning permission does not 
guarantee a connection to Scottish Water’s assets. The applicant must make a 
separate application to Scottish Water Planning & Development Services team 
for consent to connect to the public wastewater system and/or water network and 
all their requirements must be fully adhered to. 
11. Proposed site lighting designs will need to be submitted to Network Rail's Asset 
Protection Engineers for approval. The position of the lights, the type of lights 
and the throw of the lighting: e.g., a sodium light on third party land can 'wash-
out' a driver's ability to perceive a signal set at red. To the train driver, the signal 
could be perceived as yellow and the driver would proceed even though a red 
signal indicates danger and to stop. 
12. No vegetation or planting shall encroach or be able to fall within 4m of any 
Network Rail infrastructure.

Page 38

13. Where any works cannot be carried out in a "fail-safe" manner, it will be 
necessary to restrict those works to periods when the railway is closed to rail 
traffic i.e. by a "possession" which must be booked via Network Rail's Asset 
Protection Engineer and are subject to a minimum prior notice period for booking 
of 20 weeks. The Network Rail Asset Protection Engineers can be contacted 
regarding the above matters. 
14. The applicant is advised that licences under The Water Environment (Controlled 
Activities) (Scotland) Regulations 2011 (CAR) would be needed. SEPA Officers 
recommend that the applicant makes early contact with the relevant local   
regulatory team to discuss the details of the drainage proposals and or 
wastewater treatment. Details of regulatory requirements and good practice
advice for the applicant can be found on the Regulations section of our website.
If you are unable to find the advice you need for a specific regulatory matter,
please contact a member of the regulatory services team at the local SEPA office 
at: FASP@SEPA.org.uk 
15. The applicant is advised that any proposed signage will require a further   
application to be submitted for advertisement consent, unless it benefits from 
express consent as per the Town and Country Planning (Control of   
Advertisements) (Scotland) Regulations 1984. 
16. No work shall be commenced until an application for building warrant has been 
submitted and approved. 
17. As soon as practicable after the development is complete, the person who 
completes the development is obliged by section 27B of the Town and Country 
Planning (Scotland) Act 1997 (as amended) to give the Planning Authority written 
notice of that position. 
18. This planning permission will last only for three years from the date of this 
decision notice, unless the development has been started within that period (see
section 58(1) of the Town and Country Planning (Scotland) Act 1997 (as 
amended)). 
19. Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as 
amended), the person undertaking the development is required to give the 
Planning Authority prior written notification of the date on which it is intended to 
commence the development. A failure to comply with this statutory requirement 
would constitute a breach of planning control under section 123(1) of that Act, 
which may result in enforcement action being taken.