PERTH & KINROSS COUNCIL 
4 October 2023 
WORKING SMARTER TRANSFORMATION PROJECT
PULLAR HOUSE MOTHBALLING /CITY CENTRE ACCOMMODATION OPTIONS 
Report by: Stephen Crawford, Head of Property Services
(Report No. 23/268) 
1. PURPOSE 
1.1 The purpose of the report is to provide an update on progress in relation to
implementing the budget decision of March 2023 to: - 
a) mothball Pullar House from April 2024 and 
b) realise savings in 2024/25 and 2025/26 from reviewing operational
buildings through rationalisation, consolidation or working with other public
sector partners. 
1.2 The report sets out the high level emerging logistical, financial, operational
and strategic risks and opportunities identified whilst undertaking the required
work to implement Council’s decision. Based on assessment of the
implications of the mothballing proposal, it also seeks authority to undertake a
more detailed options appraisal and develop a concurrent business case to
create a Public Service Hub and retain Pullar House for consideration by
Council in August 2024. The report also seeks approval to draw down funding
from the Working Smarter earmarked reserves to complete this work. 
2. RECOMMENDATIONS 
2.1 It is recommended that Council: 
i. notes the content of the report and the work undertaken to date to
progress the decision of Council in March 2023, including the
operational, financial, partnership and strategic implications which have
been identified 
ii. pauses the instruction from March 2023 to mothball Pullar House from
April 2024 
iii. notes that officers are currently developing a hybrid working policy for
approval by January 2024 
iv. agrees to the principle of the development of a public service hub 
v. instructs officers to develop a business case, to include the potential
purchase of Pullar House, in accordance with the Council’s approved
Investment Planning framework, for consideration and decision at a
Special Council meeting in August 2024

Page 2

vi. in the absence of a viable business case being presented to Council for
consideration in August 2024, proceeds to relocate staff and mothball
Pullar House from 1 October 2024 and terminate the lease arrangement
on 10 September 2025 
vii. agrees to a Special Council meeting on 19 August 2024 to make a final
decision on the future of Pullar House; and 
viii. applies the funding of £179,000 from the Working Smarter earmarked
reserve to take forward this work. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background
• Section 5: Working Smarter Programme
• Section 6: Perth City Accommodation Analysis 
• Section 7: Options
• Section 8: One Public Sector Estate – developing an integrated public
service hub.
• Section 9: Conclusion 
4. BACKGROUND 
4.1 On 1 March 2023, the Council agreed the 2024/25 and 2025/26 provisional
Revenue Budgets. This included the decision to make a £400,000 saving from
“mothballing” Pullar House from 1 April 2024 (costs based on operating costs
reduced part year from 1 October 2024). In addition, from 1 April 2025,
Council agreed a further saving of £400,000 from the full year effect of
“mothballing” Pullar House and £1 million from the review of operational
buildings through rationalisation, consolidation or working with other public
sector partners. 
4.2 Since then, officers have been undertaking the necessary work to manage the
logistical, financial and operational requirements and risks in relation to
implementation of Council’s decision. This work has also identified potential
opportunities which will not only meet the operational requirements of the
Council for office accommodation but also facilitate the strategic ambition to
design and deliver more effective and integrated public services in the future,
whilst maintaining a strong Council presence in Perth city centre. 
4.3 These matters are set out in the report, albeit at a high level, recognising that
further detailed work will be required to enable Council to make a more fully
informed decision regarding the future use, or not, of Pullar House. This work
will provide a greater level of detail on the potential options for the building to
become a public service hub. This is explored in more detail in Section 8 of
this report.

Page 3

5. WORKING SMARTER PROGRAMME 
5.1 The Council has previously undertaken a significant office accommodation
review in Perth (Perth Office Programme) which delivered a significant
reduction in accommodate and subsequent costs in 2016/17. The key
objectives of the programme delivered: 
• the reduction of operating and property costs through reducing the
Council’s office accommodation footprint in Perth City.
• investment in the maintenance; refurbishment and modernisation of
Council owned property through savings generated from a phased
withdrawal from leased accommodation.
• Creation of a modern, flexible and efficient working environment for the
current and future delivery of public services. 
5.2 The Working Smarter Programme, approved by the Transformation and
Change Board in April 2023, builds on this and is part of the Council approved
Transformation and Change Strategy. This project aims to further transform
how we work as a Council; making the best use of our people, financial
resources, property and other physical assets and by optimising the use of
digital technology to deliver modern ways of working.   
5.2 The programme has inter-dependencies with other transformation projects
and workstreams and key Council strategies including: 
• One Public Estate
• Property Asset Management
• Digital Strategy 
• Corporate Workforce Plan
• Culture Change Programme
• Records Management Plan
• Strategic Commissioning Plan for integrated health and care
• Climate Change
• Economic Wellbeing Strategy
• Community Engagement - working with and within communities. 
5.3 As part of the wider Working Smarter Programme, there is a specific project
focussed on considering Perth City office accommodation options. 
5.4 The decision of Council in March 2023 has provided a focus for the team.
Work has been undertaken to firstly, identify and assess the risks for the
Council in relation to moving staff, closing the main city centre public access
point, and relocating the corporate records facility and the specialist CCTV
infrastructure. This will also include the loss of rental charges from space used
by partner organisations.  All of these flow directly from the decision to
mothball, then exit Pullar House. Secondly, and intrinsically linked, is the need
to determine future office requirements within the city centre, given the
decision to derive savings through consolidation/ rationalisation of the wider
operational estate.

Page 4

5.5 In terms of Pullar House, the Council currently has a 25-year lease which
expires on 10 September 2025. Under the terms of the current lease, the
Council has an option to: 
• renegotiate the lease, 
• walk away or,
• purchase the property at market value. 
If we wish to exercise our right to purchase the property at market value, then
this needs to be intimated to the Landlord by 10 September 2024. 
5.6 The Perth City office project has 12 properties within scope. These are listed
below and include Pullar House. Each of the specified properties provide
office accommodation as either their primary function or as part of the building
function. Other Perth properties are excluded such as schools and ALEO
accommodation as these do not offer clear options to relocate office
accommodation.  Similarly, the property at 1-5 High Street was considered as
part of the previous Perth Office Programme and discounted as being
unsuitable for conversion given the nature of the building, the listed elements
and the significant capital cost associated with bringing it up to required
specifications in terms of efficient, open plan and accessible working spaces. 
5.7 The 12 properties currently provide office accommodation capacity of 
12,636 m2.  The table below shows the current usage of office
accommodation only. This analysis specifically excludes public counters and
records storage across the properties as well as circulation and other non-
operational space. Eight of the properties are owned by the Council, one is
owned by the NHS and three are leased by the Council, including Pullar
House, at a combined annual lease cost of £3.45 million. The current annual
cost of Pullar House is £3.2 million. 
Key:
# properties with significant specialist accommodation 
* Leased properties 
Space only used for office
accommodation
Capacity (m2)
Pullar House* 6,631
2 High Street 2,961
Carpenter House 505
Scott Street*# 263
St Martin’s House*# 404
NAVIGATE (George Inn Lane) #   17
Almondbank House# 378
Beechgrove House 34
Colonsay Resource Centre# 269
Friarton Depot 572
Inveralmond Depot 556
Drumhar Health Centre (NHS)# 46
TOTAL 12,636

Page 5

5.8 The office accommodation capacity provides open plan, cellular offices and
meeting spaces. In some properties, the office space forms part of
accommodation that is designated and designed to offer direct support and
care to some of our priority vulnerable groups through easily accessible,
flexible, non-stigmatised, therapeutic and trauma-informed environments.
Those groups include young people including those disengaged from school
or referred through the justice system, child/adult support and protection,
services for people in the justice system and the management of offenders,
people with learning disabilities and people who are experiencing drug or
alcohol addictions and/or who require health treatment. Any reconfiguration of
the estate requires careful consideration to ensure that these services can
continue to be delivered effectively. 
6. PERTH CITY ACCOMMODATION ANALYSIS 
6.1 In light of the March 2023 decision of Council to mothball Pullar House, work
undertaken to date includes: 
• Assessment of city centre property portfolio to identify properties in
scope
• Assessment of work styles of different office-based teams
• Audit of IT provision
• Mapping exercise of meeting/collaborative space availability and
demand
• Assessment of relevant number of full time equivalent (FTE- Full Time
Equivalent) employees within scope
• Assessment of current occupancy levels 
• Forecast of future service and organisational needs
• Valuation and dilapidations assessment of Pullar House
• Assessment of HSCP requirements as per current occupation
• Phase 1 assessment of storage capacity and requirements
• Assessment of co-located team requirements 
6.2 Whilst the decision to mothball Pullar House has provided a focus for the
review of office accommodation, it has created a hiatus in other projects
looking at future operating models for more integrated working with public and
third sector partners. Uncertainty as to future accommodation capacity, type
and location has stalled discussions with potential partners. Managers have
also felt unable to reassess and give stronger messaging as to the required
balance between home and office working needed to support more
collaborative ways of working to deliver services.   
6.3 Consequently, most service teams have been operating hybrid working to suit
current working practices as opposed to implementing new ways of working.
As a result, current desk usage figures for our main office accommodation
(i.e., 2 High Street, Pullar House and Carpenter House – 30% average) do not
reflect the space needed for an operating model designed to facilitate closer
and more effective internal and external collaboration. If it was known that
Pullar House was to be retained then as an organisation we could move to
implement more integrated working around public protection and the delivery
of our shared priorities around poverty, net zero and growing our city
economy.

Page 6

6.4 Implementing the March 2023 decision requires an understanding of
emerging work practice as well as future office accommodation requirements.
To assess this, managers provided data in relation to their current operating
model and the estimated future space requirements to meet the business
needs of services going forward, aligned to the ambition for more partnership
working and integrated service delivery models. It is noted that the
organisation is presently undergoing significant structural change.  The
leadership review has established fresh operational portfolios to be
underpinned by closer internal and external collaboration. The estimated
operating requirements reflect where we are at present in terms of known
organisational structure and anticipated new ways of working. A new hybrid
working policy is currently being developed. This will form part of the work to
inform the business case. 
6.5 In accordance with guidance from Scottish Futures Trust, a 10m2 metric to
cover individual working, collaboration, mentoring and secure/private working
space is applied to establish the aggregate demand for net internal area office
space. The metric does not include other spaces that form part of the overall
spatial demand as outlined in paragraph 6.7 below.  Based on the 799.5 FTE
assessment of future need and the SFT metric above the Council will require
8000m2 of office space. Any future operating model will be less desk driven
and have more of a focus on collaborative spaces to facilitate work across
new service teams and groupings. 
6.6 This projected minimum need for approximately 8,000 m2 of desk space
across Perth City is a significant 36% reduction from the Council’s current
12,000sqm plus “office” accommodation, across all 12 sites in scope. This is
in line with where other large organisations are in this post-covid environment.
This requirement is based on a current working assumption of an equitable
home/office split. This will be developed further for the business case and will
be influenced by the hybrid working policy. 
6.7 This 8,000 m2 of assessed office accommodation required, excludes
significant space requirements for other provision within these buildings
including: 
• receptions
• public counters
• accommodation for corporate records storage
• Council chamber located in 2 High Street
• health and social care services
• specialist requirements currently provided for within Pullar House such
as CCTV (Closed Circuit Television)
• parking attendants 
• PPE (Personal Protective Equipment) storage health & social care
needs

Page 7

6.8 In developing options, buildings were categorised as follows: 
Retain: anchor /
strategically important
Release Potentially Surplus
• 2 High Street,
• Friarton Depot,
• Inveralmond Depot,
• Carpenter House,
• Almondbank House, 
• Navigate (George Inn
Lane)
• Colonsay Resource
Centre
•  Beechgrove,
•  Drumhar (NHS) 
• Pullar House
• St Martins House
• 68-86 Scott Street 
6.9 Leaving aside the requirements excluded from the net space area calculation
set out in 6.7, a high-level assessment of the data indicated that exiting Pullar
House would leave the Council with an accommodation deficit of 2,000m2 in
terms of office space plus a further deficit of 1,000 m2 for storage and
archiving capacity to comply with statutory requirements of the Public Records
(S) Act 2011. At present, corporate records are secured in a dedicated space
within Pullar House but a project is currently underway to collate and appraise
several thousand additional boxes of records which are presently dispersed
and uncategorised across the wider council estate and to bring these into the
central corporate records store and meet our information management
obligations. This could potentially see an increase in demand for centralised
records storage capacity. It is noted that the corporate records management
requirement is not simply for storage/containment – many of the documents
need to be accessible for ongoing use by officers. 
6.10 To enable the Council to mothball and exit from Pullar House as directed,
further recurring expenditure (over and above the ordinary costs associated
with removal and relocation etc) will require to be incurred to secure sufficient
accommodation and infrastructure to meet future business needs. This is
considered by officers to be a material factor which requires further
consideration by Council prior to implementation. 
6.11 That being the case, given the Council’s statutory duty to secure best value, a
high level SWOT analysis has been carried out on the basis of both: - 
(A) - exiting Pullar House and
(B) - retaining Pullar House 
6.12 The purpose of the SWOT analysis is to identify the most cost-effective model
to meet business needs whilst delivering on the Council decision to secure
savings from consolidating the city centre property estate. A summary of this
SWOT analysis is set out below. A more detailed analysis will be undertaken
as part of the business case.

Page 8

HIGH LEVEL SWOT ANALYSIS (A) - Exit Pullar House
Strengths *
• Reduction in fixed property
costs
• Potentially less direct carbon
emissions
• Less reliance on partners
subsidising surplus
accommodation
• Maximises use of Council
owned properties 
*These are potential as the
cost/impact of securing the
required additional space is
unknown as are the carbon costs
of alternative accommodation
solutions
Weaknesses
• Requirement to rent 2000m2 for
office space and 1000m2 for
storage space
• Exposure to greater financial risk
with lease / adaptation costs,
savings less certain including costs
of change
• Reduced public sector presence in
Perth city centre.
• Loss of control of a quality strategic
site within city centre / cultural
quarter and the ability to influence
longer term city regeneration and
economic growth.
• 
Threats 
• relocation costs for additional
office /storage/public reception
space may significantly
reduce/negate deliverable
savings.
• impact on city centre economic
regeneration 
• operational inefficiency
• undermines One Public Estate
policy ambitions and
opportunities for co-location
currently in development
Opportunities
• mixed/flexible office property
portfolio through leasing as opposed
to ownership.
• redesign operating model
• repurpose existing surplus
properties.
• Potential market interest in the site,
though other office accommodation
available in the city centre 
SWOT ANALYSIS (B) - Retain Pullar House
Strengths
• Meets all assessed business
needs.
• Ownership and control of strategic
site within City Centre / Cultural
Quarter
• Purchase price within the current
lease agreement significantly
reduced in comparison to
construction costs of required
office space.
• Reinforces public service
presence.
• Contribution to city centre
economy
Weaknesses
• Surplus PKC office
accommodation 
• Potentially reduced deliverable
saving as compared with exiting
PH if unable to secure partner
commitment to shared location
• Unknown net zero costs if the
building is owned by the Council.

Page 9

Threats 
• Future net zero costs
• Inability to sub-lease to partners
and generate income.
• Lack of interest in creating public
sector and 3rd sector hub
Opportunities
• Potential to generate income
from sub leasing surplus space. 
• Deliver on one public estate
ambition with public partners
• Capacity to accommodate the
corporate Archives/Museum
collection overspill. 
• Establish 3rd sector Fair City Hub 
• Asset resale or repurpose in line
with long term ambition 
7. OPTIONS 
7.1 The SWOT analysis has been used to identify scenarios upon which an initial
high-level options appraisal has been undertaken. These are set out below: - 
i. Exit Pullar House and retain all other potentially surplus office
accommodation. 
ii. Exit Pullar House, retain all other potentially surplus offices and utilise
vacant Council owned property such as Balhousie PS, Rodney Centre,
1-5 High Street, currently under option with developers. 
iii. Exit Pullar House, retain all other potentially surplus and utilise un-used
capacity in appropriate Council locality properties (e.g., Town Halls,
Community Halls, Area offices, locality depots) and community learning
campuses surplus. 
iv. Exit Pullar House, retain all other potentially surplus accommodation and
purchase or lease new premises which offer whatever shortfall in
capacity is needed to meet the assessed office/storage/archive
requirements. 
v. Exit Pullar House and all other potentially surplus properties. 
vi. Purchase Pullar House and retain all other potentially surplus properties. 
vii. Purchase Pullar House and release specific potentially surplus
(Colonsay, Beechgrove, Drumhar, St Martins House & Scott Street) 
viii. Renegotiate a new lease for Pullar House

Page 10

7.2 Options (i), (iii) and (v) are excluded on the basis that they cannot meet the
assessed office accommodation needs. 
7.3 Option (ii) is excluded due to the anticipated level of capital investment
required to meet the assessed office accommodation need, meet building
efficiency requirements and ensure accessibility compliance, significantly
reducing the deliverable savings. 
7.4 This leaves options (iv), (vi), (vii) and (viii) as potential viable scenarios
requiring further consideration. 
7.5 On basis of the risks and potential opportunities as identified by the SWOT
analysis exercises, these four options compare as follows ( ** Option (viii)
would be dependent upon the Council securing favourable lease terms): - 
7.6 High level financial modelling has also been undertaken for the four options
identified above that merit further consideration. This modelling includes
assumptions on future running costs, borrowing costs, potential income
generation and cost of change. The estimated savings attached to each
option are set out in the following graph and measured against the Council
decision to achieve £1.8 million of recurring savings from 1 April 2025. 
Known/Potential Benefits
Option
(iv)
Exit PH
Option 
(vi)
Buy PH
Option
(vii)
Buy PH
Option
(viii)
Lease PH
**
Accommodates/aligns with current
operating model (hybrid)
x x x x
Delivers Savings x x x x
One Public Sector Estate Ambition  x x x
Consolidation of City Centre
Estate/ further potential savings  
x 
Income generation opportunity  x x x
3rd sector hub opportunity  x x x
Mitigate risk re museum collection store  x x x
Mitigate risk re AK Bell Archive overspill  x x x
Ownership/control over key strategic
site 
x x

Page 11

7.7 The high-level options appraisal indicates that retaining Pullar House
potentially represents the best opportunity to not only deliver savings but to
enable wider policy ambitions in terms of integrated service delivery, closer
collaboration with the 3rd sector and optimising both commercial opportunities
and the use of public sector assets through the “one public estate” approach.
Retaining Pullar House also provides a potential solution to known or
emerging risks in relation to storage of the wider museum collection (given the
Council decision to defer investment in a new collection store) and the
Council’s archive (which now exceeds the archive capacity at AK Bell). 
8. ONE PUBLIC ESTATE – DEVELOPING AN INTEGRATED PUBLIC
SERVICE HUB 
8.1 Prior to this exercise, the Council’s Asset Management Team, in accordance
with our approved Investment Blueprint, has been working with partners to
develop a more strategic approach to the design of the future public sector
property estate to support more integrated service delivery in line with key
national drivers for more integration of public services and accommodation.
This approach has already been implemented successfully, with the co-
location of services with Police Scotland in James Square, Crieff and the
Community Safety and Community Alarm Teams sharing Scottish Fire &
Rescue accommodation at Perth Fire station. 
8.2 The benefits of a one public estate approach are widely documented and
include: 
• delivering more cohesive and integrated services to better meet the
needs of our communities;
• generate efficiencies and savings;
• create and promote growth in the local economy;
• reducing the carbon footprint of the public sector estate; 
• opportunities to make further climate change adaptations to this smaller
estate; reducing energy need and associated emissions; and 
• releasing or repurposing surplus public service sites for potential
affordable housing, community adoption or economic development.

Page 12

8.3 As part of that work, there has been an ongoing project to consider the
viability of developing an integrated public service hub in Perth City which
brings services and agencies together in a single location to provide more
cohesive service provision and an improved customer experience.
Discussions have been ongoing with internal services, the Health & Social
Care Partnership, Police Scotland, Scottish Government and 3rd sector
organisations. These have been positive. However, the uncertainty around the
Council’s continuing occupation of Pullar House has impacted on progress. 
8.4 The model being adopted is consistent with the principles of the recent Verity
House agreement between Scottish Government and Local Government.
Officers have had encouraging discussions with senior Scottish Government
civil servants to explore opportunities. 
8.5 Should the Council be minded to support the recommendations within this
report, this will provide assurance to potential partners and enable the Council
to enter into more formal discussions regarding the co-location of these
services/agencies to Pullar House and the respective lease terms. 
9. CONCLUSION 
9.1 It is however recognised that the proposal is not without risk. Success is
dependent upon several factors some of which are outwith our control (e.g.,
decisions of partners or an unexpected shift in anticipated market value of the
property etc.) More detailed assessment and analysis is required to determine
the viability of any potential business case for the purchase/retention of Pullar
House. To ensure business continuity and mitigate risk however concurrent
work will continue to identify suitable alternative office provision, public access
points, storage and other specialist accommodation to ensure that the Council
can proceed to mothball and exit Pullar House should the business case fail. 
9.2 In preparing the outline business case, we will review the city centre property
portfolio and undertake a more in-depth assessment of future business needs,
availability and costs of external office / storage, alternative public counter
accommodation, corporate records storage and costs of change. 
9.3 Concurrent work will also be undertaken to determine the detailed costs
associated with implementing the original decision to mothball and exit if a
viable business case cannot be made to retain Pullar House.   
9.4 Regardless of whether we decide to retain or exit Pullar House as an
operational building, more detailed space planning work needs to be carried
out alongside a review and development of the Council’s hybrid working policy
to ensure that our future operating model is effective and that our office
property estate is fit for purpose. This exercise will move teams into smaller
accommodation footprints over the next 9 months – 12 months either in
readiness for public sector hub aspirations or to exit Pullar House in 2025.

Page 13

9.5 Approval is sought to draw down £179,000 from the Working Smarter
earmarked reserve to take this work forward.  This funding will support project
management, space planning and design costs, the cost of advice on any
potential building remodelling, updated independent valuation advice and
property marketing material which would be used to engage potential
partners. It also includes funding towards a plan to exit Pullar House in the
absence of a viable business case. 
9.6 In terms of the current legal agreement in relation to Pullar House, if the
Council wishes to exercise its right to purchase the property, it must commit to
this by 10 September 2024. It is recommended that Council will agree the
future of Pullar House at a Special meeting on 19 August 2024. 
9.7 This report provides members with an update on the work undertaken to date
to implement the decision of March 2023 to mothball Pullar House with a view
to exit in 2025. 
9.8 The work has identified a number of operational, financial, partnership and
strategic implications which officers consider to be material and requiring
further consideration by Council. 
Approved 
Name Designation Date 
Thomas Glen  Chief Executive  26 September 2023 
Name  Designation Contact Details
Stephen Crawford  Head of Property
Services
scrawford@pkc.gov.uk
Lisa Simpson Head of Legal &
Governance Services
lsimpson@pkc.gov.uk
Scott Walker Chief Accountant  swwalker@pkc.gov.uk

Page 14

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation. They are as
follows: 
• Tackling poverty
• Tackling climate change and supporting sustainable places
• Growing a sustainable and inclusive local economy
• Enabling our children and young people to achieve their full potential.
• Protecting and caring for our most vulnerable people
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all these objectives. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than
those reported within the body of the main report.

Page 15

Workforce 
2.2 There are no direct workforce implications arising from this report other than
those reported within the body of the main report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
2.4 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups. Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
2.5 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act. However, no action is required as the Act does not apply to the matters
presented in this report. 
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council must discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions. 
3.6 The information contained within this report has been considered under the
Act. However, no action is required as the Act does not apply to the matters
presented in this report.

Page 16

4. Consultation 
Internal 
4.1 The Executive Leadership Team have been consulted in the preparation of
this report. 
2. BACKGROUND PAPERS 
2.1 No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3. APPENDICES 
• None