Draft Corporate Delivery and Improvement Plan 2024/25
1
Appendix 1
Draft Corporate Delivery and 
Improvement Plan 2024/25
A Perth and Kinross where everyone can live life well,
free from poverty and inequalities

Page 2

Draft Corporate Delivery and Improvement Plan 2024/25
2
Contents
Introduction .......................................................................................................................................................................................................... 3
Improvement activity: Tackling poverty ............................................................................................................................................................... 4
Improvement activity: Tackling climate change and supporting sustainable places .............................................................................................. 6
Improvement activity: Developing a resilient, stronger and greener local economy .............................................................................................. 9
Improvement activity: Enabling our children and young people to achieve their full potential ............................................................................. 12
Improvement activity: Protecting and caring for our most vulnerable people ...................................................................................................... 15
Improvement activity: Supporting and promoting physical and mental wellbeing ................................................................................................ 18
Improvement activity: Working in partnership with communities ......................................................................................................................... 19

Page 3

Draft Corporate Delivery and Improvement Plan 2024/25
3
Introduction
Welcome to our draft Corporate Delivery and Improvement Plan
(CDIP) for 2024/25. 
This is a new element of the Council’s strategic planning and
performance framework. Introduced this year as part of new
performance reporting and strategic planning arrangements, it
complements the Annual Performance Report by setting out key
proposed improvement activity for the year ahead at an
organisational level. Together the CDIP and the APR demonstrate
how we are delivering on the commitments we set out in our
Corporate Plan to work towards our vision of:
a Perth and Kinross where everyone can live life well, free from
poverty and inequalities.
This draft Corporate Delivery and Improvement Plan sets out
proposed activities within the 2024/25 year of the Corporate Plan
cycle to work towards this vision. The proposed strategic
improvements included within this plan are for areas where
performance reporting shows more attention is needed, or where
new activities to support the delivery of our priorities have been
identified through customer feedback, self-evaluation,
benchmarking and other strategic reports.
Where our performance reporting shows that we are doing well and
that current approaches are achieving or exceeding targets we are
not proposing additional improvement activity. This work will
continue where it is necessary to maintain performance. As will the
large volumes of business-as-usual activity which ensure the
effective delivery of our statutory duties and local commitments. 
Similarly, previously identified supporting improvements and
transformation and change activities - such as consolidation work
and our new strategic operating model for the organisation - which
will help us deliver the Corporate Plan priorities, are not detailed
here. This work is ongoing, and progress will continue to be
monitored and reported through agreed Transformation and
Change governance arrangements.
We will continue to report back on ongoing and improvement
activity through the Annual Performance Report and have updated
the performance targets for 2023/24 and future years against each
of the performance indicators within our corporate plan.
Elected members will be invited to provide comment and feedback
on the areas of activity in this draft Corporate Delivery and
Improvement Plan through a range of opportunities during the
2024/25 budget setting cycle. Alongside this we will gather public
feedback through our annual budget priorities consultation. Once
the final budget for 2024/25 has been set in early 2024, an updated
Corporate Delivery and Improvement Plan based upon the agreed
and funded improvement areas will be reported back to Council for
final approval.
Councillor Grant Laing,  Thomas Glen,
Council Leader   Chief Executive

Page 4

Draft Corporate Delivery and Improvement Plan 2024/25
4
Improvement activity: Tackling poverty 
Corporate
Priority Action
What improvements
do we want to
achieve?
How will we make these
improvements?
How will we
know if we have
been
successful?
Strategic
Lead
Target
date
Linked
strategy/plan
Prevent and
mitigate the
impacts of
poverty for
children living in
Perth and
Kinross 
A co-ordinated and
collaborative approach
with partners and
communities to mitigate
the impact of poverty.
During 2023/24 we are
developing an overarching
poverty strategy for Perth and
Kinross. Key strategic actions
for 2024/25 to prevent and
mitigate the impacts of
poverty for children living in
Perth and Kinross will be
established as part of that
strategy.
Performance
measures will be
agreed as part of
the Poverty
Strategy.
Strategic
Planning,
People &
Performance
March
2026
Poverty
Strategy (in
development)
Local Child
Poverty Action
Report 
Ensuring that costs of
participation in school
activities are minimised
or mitigated to reduce
the impact this has on
the outgoings of
families in or at risk of
poverty.
Increasing uptake of free
school meals for eligible
children.
Reduce the cost of the school
day.
Increasing uptake of the
National Entitlement Card for
free bus travel to reduce travel
costs.
A 5% increase in
uptake of free
school meals
compared to
previous year.
Schools will be
using the Cost of
the School Day
toolkit and action
Education &
Learning 
March
2025
Poverty
Strategy (in
development)
Local Child
Poverty Action
Report

Page 5

Draft Corporate Delivery and Improvement Plan 2024/25
5
plans will be in
place.
A 5% increase in
uptake of the
National
Entitlement Card
amongst under-
22s. 
Customer &
Digital
Services
Mitigate cost of
living pressures
for households
experiencing
and at risk of
poverty
Reduce dependency on
foodbanks. 
Develop cash first
partnerships with the third
sector in localities to allow
support to be provided to
those in need in a way that is
easily accessible within their
local communities.
Foodbanks
reporting
reduction in
demand.
Number of
established cash
first partnerships. 
Strategic
Planning,
People &
Performance
March
2026
Poverty
Strategy (in
development)

Page 6

Draft Corporate Delivery and Improvement Plan 2024/25
6
Improvement activity: Tackling climate change and
supporting sustainable places 
Corporate Priority
Action
What
improvements do
we want to
achieve?
How will we make these
improvements?
How will we
know if we have
been
successful?
Strategic
Lead
Target
date
Linked
strategy/plan
Supporting the
prioritisation of
sustainable,
cleaner, and
greener transport
Develop a long-term
sustainable strategy
for increasing and
maintaining the
electric vehicle
charging network in
Perth and Kinross.
During 2023/24 we are
developing an electric vehicle
strategy for Perth and
Kinross. Key strategic actions
for 2024/25 to develop the
electric vehicle charging
network in Perth and Kinross
will be established as part of
that strategy.
Performance
measures will be
established as
part of the electric
vehicle strategy.
Economy,
Development
& Planning
March
2025 
Ensure we have a
cleaner and greener
Council fleet.
Develop an electric vehicle
transition plan for moving
council vehicles from
diesel/petrol to electric or
other zero direct carbon fuel
technologies.
Increase in
percentage of
Council journeys
undertaken with
electric or other
zero direct carbon
fuel vehicles.
Environment
&
Infrastructure
April
2024

Page 7

Draft Corporate Delivery and Improvement Plan 2024/25
7
Integrate active
travel options into
the development of
large infrastructure
schemes.
By delivering active travel
measures as part of the
Cross Tay Link Road,
including new and improved
paths, controlled crossing
facilities, bus stop provisions,
a green bridge and a park
and choose facility.
Monitoring usage
of active travel
measures
resulting in a 20%
reduction of
vehicle
kilometres.
Economy,
Development
& Planning
March
2025
Local
Development
Plan 2
Mobility
Strategy (in
development)
Perth
Transport
Futures
Improve the energy
efficiency of our
buildings, and
encourage our
partners and
private
householders to
consider
improvements
Improved energy
efficiency and
reduction in carbon
emissions in the
Council estate.
During 2023/24 we are
developing a Local Heat and
Energy Efficiency Strategy
(LHEES). Key strategic
actions for 2024/25 to
improve energy efficiency
and reduce carbon emissions
in domestic properties across
Perth and Kinross will be
established as part of this
strategy.
Key strategic actions for
2024/25 to be set as part of
the domestic/non-domestic
decarbonisation plan being
developed in 2023/24.
Performance
measures to be
established in the
LHEES.
Environment
&
Infrastructure 
Property
Services
March
2025
Climate
Change
Strategy
LHEES (in
development)

Page 8

Draft Corporate Delivery and Improvement Plan 2024/25
8
To conserve and
enhance the
biodiversity of our
natural
environment
Increase provision of
biodiversity sites.
Developing a long term plan
for managed grassland
areas.
Delivery of UK Shared
Prosperity Fund funded
Biodiversity Towns and
Villages Project and the
Greening Industrial Estates
Project.
Making provisions for
biodiversity within the Cross
Tay Link Road project, ie
green bridge and wetland
area.
Volume of uncut
areas are
increased.
Increase in
number of
biodiversity
interventions. 
Increases in
observed
biodiversity
markers (insects,
animals and
wildflowers).
Environment
&
Infrastructure 
Economy,
Development
& Planning
March
2025
Climate
Change
Strategy
Tayside
Biodiversity
Action Plan
To adapt to and
mitigate the impact
of climate changes
on the way we
operate
Reduce carbon
emissions caused by
traffic in Perth city
centre.
Delivery of Cross Tay Link
Road to divert traffic away
from the city centre.
Preparing for phase 4 of
Perth Transport Futures by
scoping investment activity in
active travel/public transport.
Air quality and
traffic modelling.
Economy,
Development
& Planning
March
2025
Local
Development
Plan 2
Perth
Transport
Futures
Air Quality
Action Plan

Page 9

Draft Corporate Delivery and Improvement Plan 2024/25
9
Improvement activity: Developing a resilient, stronger
and greener local economy
Corporate Priority
Action
What improvements
do we want to
achieve?
How will we make these
improvements?
How will we know
if we have been
successful?
Strategic
Lead
Target
date
Linked
strategy/plan
Support and
promote business
growth and
investment
Unlock new
investment and
housing land to
support business
growth.
Commence Perth West
Eco Innovation Park. 
Level of business
interest in Perth
West. 
Economy,
Development
& Planning
March
2025 
Make Perth a more
competitive inward
investment
destination.
Developing and
improving the Invest in
Perth information and
advice website.
Working closely with
Business Gateway and
key businesses and key
sector representatives.
Increased levels of
interest and
awareness in inward
investment
opportunities in
Perth.  
Economy,
Development
& Planning
March
2025 
Increased number of
businesses in the
creative industry.
Renewed focus on the
Visitor, Cultural and
Creative Economy, as a
result of greater
Demand for
business space for
Economy,
Development
& Planning
March
2025

Page 10

Draft Corporate Delivery and Improvement Plan 2024/25
10 
collaboration through the
new strategic operating
model.
creative industries
will increase. 
Invest in innovative
green power and
smart technology
solutions
Have a Smart
Energy Programme
supported by public
and private
investment.
Develop a pipeline of
smart energy projects.
Develop a decision toolkit
to develop business
cases for investment.
Increased
investment in smart
energy projects.
Increase in number
of registered
businesses in
energy.
Economy,
Development
& Planning
March
2025 
Promote what our
city and towns
have to offer to
businesses,
investors and
tourists
More people to
choose Perth and
Kinross as a
destination for
holidays and day
trips.
Increased promotion of
consumer and visitor offer
via Perth City and Perth
and Kinross Towns
website and social media
channels.
Deliver national and
international tourism
campaigns with
VisitScotland.
Attend or be represented
at national and regional
travel trade events.
Increased consumer
and visitor
expenditure, dwell
time and overnight
stays
Economy,
Development
& Planning
March
2025
Culture
Strategy 2023-
2028

Page 11

Draft Corporate Delivery and Improvement Plan 2024/25
11 
Support people
into work and
encourage
business to access
initiatives to create
new opportunities
Further enhance our
employability
outreach capacity,
supporting
individuals in
community settings.
Review and increase the
number of employability
outreach locations and
frequency.
Increased numbers
of individuals
supported in
targeted locations
and overall increase
in number of people
supported.
Economy,
Development
& Planning
March
2025
Economic
Wellbeing Plan
2020-2028 
Remove barriers to
employment for
parents.
Improving access and
availability of registered
quality childcare.
Launch a pilot of
community childminding.
Use the Parental
Employment Support
Fund to connect
childcare, employability
and transport.
Increased number of
registered childcare
providers.
Feedback from pilot. 
Increase in priority
groups supported
into employment.
Economy,
Development
& Planning
Education &
Learning
March
2025
Local Child
Poverty Action
Report

Page 12

Draft Corporate Delivery and Improvement Plan 2024/25
12 
Improvement activity: Enabling our children and young
people to achieve their full potential
Corporate
Priority Action
What improvements do
we want to achieve?
How will we make
these
improvements?
How will we
know if we have
been
successful?
Strategic
Lead Target date Linked
strategy/plan
Ensure inclusive
and quality
education for all
and promote
lifelong learning
Attainment at key
milestones is raised for
all children and young
people.
Using health and
wellbeing census data
to inform school level
improvement plans.
Implementation of the
Literacy, Numeracy
and Learning and
Teaching Frameworks
2-18  through a
programme of
professional learning.
PKC attainment
for each of the
indicators within
the Corporate
Plan will increase
to at least target
levels.
Education
& Learning
Feb 2026
(due to timing
of publication
of data for
2024/25)
Raising
Attainment
Strategy 2020-
2023  
Education
Service
Improvement
Plan 2023-24 
Increase the number of
young people going into
positive destinations
such as work
experience, further
education, volunteering
and employment.
By placing an
Employability Youth
Worker in each locality
to liaise with schools.
Early intervention
approach in school
and delivery of
Increase in
participation
measure of school
leavers entering
positive
destinations.
Education
& Learning
March 2025

Page 13

Draft Corporate Delivery and Improvement Plan 2024/25
13 
employability
programmes. 
A school atmosphere
conducive to learning
and personal
development, where
children and young
people feel safe, secure,
listened to and have their
views taken into account
on issues that affect
them.
Implementation of the
updated Anti-Bullying
Strategy.
Key strategic actions
for 2024/25 will be
established in the
updated Anti-Bullying
Strategy.
Schools will have
robust procedures
to reduce bullying
in line with
improving
relationships.
Reduction in
reported
incidences of
bullying in
schools.
Increase in
wellbeing
measures
recorded at school
and Local
Authority level.   
Reduce the
poverty-related
attainment gap
Improved understanding
of causes of attainment
gap so that effective
interventions can be
identified and
implemented.
Review and refresh the
PKC interventions
toolkit to address the
needs of key priority
groups.
All schools will
plan, record and
track pupil
progress via the
Closing the Gap
tool.
A reduction in the
poverty-related
attainment gap,
Education
& Learning
February
2026 (due to
timing of
publication)
Raising
Attainment
Strategy 2020-
2023

Page 14

Draft Corporate Delivery and Improvement Plan 2024/25
14 
particularly for
those most
deprived and in
key priority
groups.
Ensure that
Looked After
Children and
children with
additional
support needs
achieve
comparable
outcomes
Improve support to
children and young
people with additional
support needs to realise
their potential.
Through the Additional
Support for Learning
Transformation
Programme.
Maintain or
reduce placement
within
independent
schools.
Increase
percentage of
children with ASN
being supported in
mainstream
school settings.
Education
& Learning
March 2025 Raising
Attainment
Strategy 2020-
2023   
ASN
Transformation
Programme
Increase in community
placements for children
and young people
responding to immediate
need.
Increase the
recruitment and range
of community
placement providers.
Support more kinship
carers.
Reduction in use
of residential
placements.
Increase in
available
community
placement
providers.
Feedback from
children and
young people
placed with
Children,
Families &
Justice
March 2025

Page 15

Draft Corporate Delivery and Improvement Plan 2024/25
15 
community
providers or in
kinship care
placements. 
Improvement activity: Protecting and caring for our most
vulnerable people
Corporate
Priority Action
What improvements
do we want to
achieve?
How will we make
these
improvements?
How will we know if
we have been
successful?
Strategic
Lead Target date Linked
strategy/plan
Ensure we
quickly identify
children, young
people and
adults at risk of
harm and abuse
and take the
necessary
actions to keep
them safe
Take a trauma-
informed approach to
interviewing children
for evidence to
inform ongoing care
and protection
planning.
Implement the
Scottish Child
Interview Model.
Number of interviews
which have been
carried out using the
Scottish Child
Interview Model.
Quality of evidence
gathered and
suitability for use in
ongoing care and
protection planning.
Children,
Families &
Justice
March 2025

Page 16

Draft Corporate Delivery and Improvement Plan 2024/25
16 
Ensure that
people get the
right care,
accommodation
and support
where and
when they need
it
Enhance our housing
support offer by
implementing an
Intensive Housing
Support Service for
people with complex
needs.
Commission a third
sector provider to
deliver intensive
housing support.
Repeat
homelessness
presentations will be
minimised and
tenancy sustainment
for previously
homeless people
with complex needs
will increase.
Feedback from
people with complex
needs will be positive
with better outcomes
being reached.
Housing &
Communities
March 2025 Local Housing
Strategy 2022-
2027 
Rapid Rehousing
Transition Plan
(Home First)
2019-2024 
Maintain sibling
relationships for care
experienced children
to deliver on the
principles of The
Promise.
Ensure children and
young people are
listened to and
helped to have a say
through Family
Group Decision-
Making and access
to Independent
Advocacy.
Create Lifelong Links
plans for every care
experienced child,
incorporating links
with brothers and
sisters, where
relevant and where
Feedback from care
experienced young
people.
Children,
Families &
Justice
March 2025 Perth and Kinross
Corporate
Parenting Plan
2021-2024

Page 17

Draft Corporate Delivery and Improvement Plan 2024/25
17 
the young person
wishes this.
Prepare for the
establishment
of the National
Care Service
and continue to
strive for
excellent health
and social care
outcomes for
the people of
Perth and
Kinross
In June 2023, the
Scottish Parliament
extended the
deadline for the
completion of Stage
1 of the National
Care Service
(Scotland) Bill to
January 2024. It was
then announced in
July 2023 that
accountability for the
National Care
Service would be
shared between the
Scottish
Government, NHS
and local authorities.
As part of this the
latter will continue to
employ staff and be
responsible for
assets such as
buildings. 
We will continue to
monitor national
developments and
consider activity as
required.

Page 18

Draft Corporate Delivery and Improvement Plan 2024/25
18 
Improvement activity: Supporting and promoting
physical and mental wellbeing
Corporate Priority Action
What
improvements do
we want to
achieve?
How will we make
these improvements?
How will we
know if we
have been
successful?
Strategic
Lead
Target
date
Linked
strategy/plan
Improve health and
wellbeing in Perth and
Kinross by increasing
overall participation in
sport and physical
activity and promoting
the wellbeing benefits of
time spent in our natural
surroundings
Increase uptake of
sport and physical
activities.
Work with key partners
to develop programmes
which optimise
opportunities for
physical activity.
Social prescribers
encouraging the use of
outdoor activities.
Work with schools and
sport groups to increase
the number of
opportunities for children
and young people to
take part in physical
activity.
Numbers of
participants
have increased. 
Reduction in
health and
social care
issues related
to inactivity..
Economy,
Development
& Planning 
Health and
Social Care
Partnership 
Education and
Learning 
March
2025
Physical Activity
and Sports
Strategy 2023-
2028 
Health and Social
Care Strategic
Plan

Page 19

Draft Corporate Delivery and Improvement Plan 2024/25
19 
Improve health and
wellbeing in Perth and
Kinross by ensuring that
people have access to
wellbeing support when
they need it
Reduce waiting
times for people to
access Mental
Health Services.
Redesigning specialist
community mental
health services across
Tayside.
Increase access to
preventative and
community support.
Reduction in
waiting lists
(numbers and
time). 
Health and
Social Care
Partnership
March
2025
Community
Mental Health
and Wellbeing
Services
Strategic Delivery
Plan 
Improvement activity: Working in partnership with
communities
Corporate Priority
Action
What
improvements do
we want to
achieve?
How will we make
these
improvements?
How will we know if
we have been
successful?
Strategic
Lead
Target
date
Linked
strategy/plan
Establish locality
multidisciplinary
teams working with
our community
planning partners and
residents to identify
and address local
Deliver a clear,
consistent and
joined up approach
to supporting
communities and
households with the
help and support
Develop additional
multi-disciplinary
teams in more
locations focussed
around locally
identified needs.
Feedback from
communities and staff
on the effectiveness of
the multi-disciplinary
team approach.
Strategic
Planning,
People &
Performance
March
2025
Local Child
Poverty Action
Report

Page 20

Draft Corporate Delivery and Improvement Plan 2024/25
20 
solutions to local
needs
they need to
mitigate and move
beyond poverty. 
Strengthened
partnerships within
localities with case
studies to evidence.
Transformation
& Change
Strategy 2022-
2027 
Increase the supply
and availability of
rural housing
Provide more
affordable homes to
support liveable and
sustainable
communities. 
Deliver PKC’s
affordable housing
programme of 1,050
over the next 5 years
Maintain 53% / 47%
split across urban and
rural areas.
Achieve an average of
210 affordable housing
completions each
year.
Economy,
Development
& Planning
2027 Local Housing
Strategy 2022-
2027 
Develop and expand
our approach to
working with
communities to
identify local actions
and priorities and
deliver on these
together
Supporting
community groups
to manage local
assets, such as
community halls.
Support community
groups to develop
Community Asset
Transfer (CAT) plans.
Carry out
engagement activity
to promote
Community Asset
Transfer as an option.
Increase in number of
Community Asset
Transfers.
Increase in community
groups applying for
community asset
opportunities.
Housing &
Communities
March
2025
Property Asset
Management
Plan
Community
Asset Transfer 
Expand and improve
formal community
engagement
structures, ie
Implement
recommendations
and actions from
review of current local
Increased in
engagement with
community members
Housing &
Communities
March
2025

Page 21

Draft Corporate Delivery and Improvement Plan 2024/25
21 
development Local
Action Plans.
decision making
committees and
create new structures
where appropriate.
through new
structures.
Feedback from
communities about
impact of new local
decision making
committees.
Increased
engagement and
applications from
communities to the
Community
Investment Fund
grants programme. 
Review application
and assessment
process.
Further strategic
improvements will be
identified through
evaluation of the
2023/24 Community
Investment Fund
programme.
Increase in the number
of successful
applications.
Increase in the number
of people/communities
benefitting from a CIF
funded project.
Housing &
Communities
March
2025 
Deliver our internal
cultural change
programme ensuring
all staff contribute to
our commitment to
engage with and be
accessible and
responsive to our
residents and
communities
An empowered and
skilled workforce
who are confident in
engaging with
resident and
communities and
demonstrate the
organisational
values and expected
behaviours at all
times.
Delivery of action
within the Employee
Engagement and
Cultural Change
Programme.
Learning and
development
opportunities for staff
on community
Feedback from our
workforce, managers
and community
members.
Number of participants
in leaning and
development
opportunities.
Reduction in
complaints relating to
Strategic
Planning,
People &
Performance
March
2025
Employee
Engagement
Plan 2023

Page 22

Draft Corporate Delivery and Improvement Plan 2024/25
22 
engagement and
participation.
behaviours or actions
contrary to our
organisational values
and behaviours.