PERTH & KINROSS COUNCIL 
10 May 2023 
TREASURY & INVESTMENT STRATEGY and PRUDENTIAL INDICATORS
2023/24 – 2027/28 
Report by the Head of Finance
(Report No. 23/135) 
1. PURPOSE OF REPORT 
1.1 This report details the Council’s proposed Treasury Strategy for 2023/24 to
2027/28, the Investment & Property Strategy for 2023/24 and Prudential
Indicators for 2023/24 to 2027/28. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Council: 
• Notes the contents of this report. 
• Approves the five year Treasury Strategy for 2023/24 to 2027/28, as
detailed in this report, which is submitted in accordance with the
Council’s approved Treasury Management Practices (TMP). 
• Approves the Permitted Investments and Investment Strategy for
2023/24 outlined at Section 7 and detailed at Appendix III of this
report. 
• Approves the Property Investment Strategy for 2023/24 outlined at
Section 8 and detailed at Appendix IV of this report. 
• Approves the proposed Prudential Indicators for 2023/24 to 2027/28, as
outlined at Section 11 and detailed at Appendix V of this report. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
Section 4 – The Council’s current Treasury position
Section 5 – Prospects for interest rates
Section 6 – Capital requirements and the borrowing strategy 2023/24 to
2027/28
Section 7 – The Investment Strategy 2023/24
Section 8 – Investment properties 2023/24
Section 9 – Debt Rescheduling Opportunities
Section 10 – The Prudential Code
Section 11 – Prudential Indicators 2023/24 to 2027/28
Section 12 – Conclusion

Page 2

3.2 The Treasury and Investment Strategy details the expected activities of the
Council’s treasury function for the relevant financial years.  Its submission to
the Council is a requirement of the Council’s approved Treasury Management
Practices (TMPs) and is also a requirement under the CIPFA Code of Practice
for Treasury Management.  The Investment Strategy details the Permitted
Investments of the Council, and outlines the risks associated with the
expected investment activities.  The submission of an annual Investment
Strategy is a requirement of the Local Government Investments (Scotland)
Regulations 2010. 
3.3 In determining the Treasury Strategy, the Council is required to review its
Prudential Indicators.  The Council approved the Composite Capital Budget
for the five years to 2027/28 at its meeting on 1 March 2023 (report 23/73
refers).  This report also proposes updated Prudential Indicators for the five
years 2023/24 to 2027/28 in line with the five year Capital Delivery
Programme approved by the Council. 
4. THE CURRENT TREASURY POSITION 
4.1 In order to put the proposed Treasury Strategy for 2023/24 to 2027/28 into
context, the Council’s treasury position at the start of the financial year as at
31 March 2023 is shown below: 
PRINCIPAL
AMOUNT
(£million)
AVERAGE
RATE
(%)    
Fixed Rate  • Public Works Loan Board (PWLB) 560.0 2.40 
• Market Bonds 0.1 0.00  
560.1 2.40    
Variable Rate • Short Term Market Loans 0.0 0.00 
• Market Bonds 43.2 4.59 
• Local Loans  5.4 3.76 
48.6 4.49    
PFI/PPP • PFI/PPP Contracts 121.3 5.10   
TOTAL GROSS DEBT 730.0 2.99   
TOTAL SHORT-TERM MARKET INVESTMENTS (173.7) (3.76)   
TOTAL NET DEBT 556.3 2.75

Page 3

4.2 The projected Borrowing Requirement for each of the next five years, which is
a significant determinant of treasury activity, is summarised below.  This
reflects the approved Capital expenditure within the Council’s Composite and
Housing Investment Programme Budgets which is to be funded by new
borrowing. 
£ million 2023/2
4
2024/25 2025/26 2026/27 2027/28 Total
Borrowing
Requirement
155.7 184.8 108.0 65.4 59.5 573.4 
4.3 The above figures are based upon the Composite Capital Budget and the
Housing Revenue Account Capital Investment Programme for 2023/24 to
2027/28.  The above figures do not take account of the estimated annual
borrowing requirement carried forward between years in order to match
cashflow requirements.  However, they do highlight the front loading of the
Council’s planned Capital expenditure. 
5. PROSPECTS FOR INTEREST RATES 
5.1 The Council’s treasury adviser, Link Asset Services Ltd, assists the Council in
formulating a view on interest rates.  Appendix I shows forecasts of the Bank
Base Rate (or short-term/variable rates) and longer-term PWLB fixed interest
rates, whilst Appendix II shows the forecast in graphical form.  As can be
seen, a further increase in the Bank Base Rate is expected this year before
falling steadily in subsequent years.  The forecast also shows that longer-term
rates are currently anticipated to be around their peak, subject to short term
fluctuations. 
5.2 The Monetary Policy Committee (MPC) increased the Bank Base Rate further
to 4.25% at its most recent meeting on 23 March 2023.  The increases in the
Bank Base Rate over the last year have been in response to the significant
rise in inflation over the period.  Whilst inflation shows signs of peaking at
present at around 10% and is expected to fall significantly in the next year,
recent figures still show that inflation remains persistently high.  Therefore, it is
anticipated that there will be a further rise in the Base Rate before it starts
reducing towards the end of the year as inflation falls. 
5.3 Longer term interest rates are expected to follow as similar pattern.  However,
the unwinding of the Bank of England’s monetary policy of measures to
stimulate economic activity and the money supply, known as Quantitative
Easing (QE), also puts upward pressure on interest rates.  Consequently,
subject to periods of volatility, the forecast for UK interest rates shows a
steady decline over the remainder of this year, however, at a slower rate than
short terms rates. 
5.4  The Council’s borrowing costs are largely determined by the Public Works
Loan Board’s (PWLB) interest rates, which in turn are determined by the yield
on UK Government gilts.  Gilt yields have been at higher levels throughout the
last year, primarily due to high levels of inflation.  The rates available during

Page 4

2023/24 are expected to remain higher than they had been in the previous
years despite being forecast to gradually fall. 
5.5 As with any forecast, the above interest rate expectations are subject to
variation.  The main sensitivities of the above forecast are likely to be as
follows: 
• A sharper fall in long term rates which could occur, for example, if
economic growth or inflation was lower than forecast.  This could arise if
economic demand was subdued in the aftermath of the cost-of-living
crisis.
• A sharp rise in both long and short-term rates could occur if, for example,
economic growth recovered faster than expected, or if inflation didn’t fall
as expected, or increased further, as the economy recovers. 
5.6 Interest rate forecasts throughout the period covered by the Capital
Programme must be considered, particularly when determining the most
appropriate timing for new borrowing.  This is particularly the case as the
Council’s current Borrowing Requirement is significantly higher than historic
levels, much of which is required in the earlier years of the current five year
programme. 
5.7 The current forecasts indicate that short term borrowing will continue to be
less expensive than longer term borrowing over the next few years.  However,
longer term borrowing gives budget certainty and reduces the refinancing risk
in later years. 
6. CAPITAL REQUIREMENTS AND BORROWING STRATEGY 
6.1 The Council requires significant levels of new borrowing over the next few
years to fund the Capital Budget.  Following the advance borrowing at
extremely low rates undertaken in 2019/20 and 2021/22 there is no immediate
need or expectation to borrow until late in 2023/24 based on current planned
expenditure.  Therefore, new borrowing in advance of this timeframe would
only be undertaken if capital expenditure were to be incurred earlier than
projected, or if opportunities arose to borrow at low rates.  Short term
temporary borrowing can also be used to meet any immediate cashflow
requirements where long-term borrowing is deferred. 
6.2 The previous low interest rates and long-term cost certainty provided by fixed
rate PWLB borrowing make this the most cost-effective source of financing of
capital expenditure.  However, given the recent increases in PWLB rates,
other institutions, and market instruments available to the Council may be
used where appropriate.  Examples include the UK Infrastructure Bank which
currently offers finance to UK local authorities at below PWLB rates for
qualifying infrastructure projects aligned to the UK Government’s Net Zero
objectives.  Market instruments may also allow borrowing to be agreed in
advance and drawn down at prescribed future dates (usually up to three years
ahead).  Therefore, alternative sources of borrowing will be evaluated and
considered where they offer savings or other advantages over prevailing
PWLB borrowing.

Page 5

6.3 The Council’s Treasury Strategy is based on being “risk-aware" and the
Council will actively seek to manage its treasury risks.  The Council’s
borrowing position will continue to be reported on an ongoing basis as part of
the Quarterly Treasury Activity and Compliance reports. 
6.4  The Council’s borrowing strategy will be continuously reviewed and may
change if there are unexpected movements in interest rates.  This could
impact the borrowing strategy as follows: 
• If there was a faster fall in long term rates than expected, long-term
borrowing in advance of immediate need may be considered.
• If there was an unexpected sharp rise in long term rates, fixed-rate funding
would be deferred further, and short-term borrowing used to meet any
immediate needs.  Longer term borrowing would be considered in future
when longer term rates fell from their peaks. 
6.5 The Prudential Code requires authorities to detail their strategy on gross and
net debt where there is a significant level of both investments and borrowing. 
It is not possible, nor desirable, to have no investments due to the daily
variations in the Council’s cashflow position or following the borrowing of long-
term debt.  The level of investments may also increase where there are
significant levels of short-term Reserves.  The Council’s level of investments
had increased significantly following the increased level of long-term
borrowing undertaken in recent years.  The level of investments has, however,
fallen over the last year and is anticipated to steadily reduce further over the
next year in line with the delivery of the Capital Programme. 
7. INVESTMENT STRATEGY 2023/24 
7.1 The requirement to set an annual Investment Strategy is determined by the
Local Government Investments (Scotland) Regulations 2010.  These
requirements include specifying the Permitted Investments of the Council and
setting an annual strategy, identifying the risks associated with the strategy
and the reporting requirements. 
7.2 The proposed Permitted Investments of the Council are shown at Appendix
III.  These reflect low risk investment products and, together with the
application of the approved Lending & Investment Policy (TMP4, Schedule 4.6
Approved Lending & Investment Policy), ensure investments are only made
with low-risk counterparties. 
7.3 It is not proposed to make any changes to the Permitted Investments for
2023/24, including the range of investment instruments or monetary
limits.  The current limits ensure that the Council always maintains
sufficient liquidity and a spread of investments, whilst the specific
counterparty list is reviewed continuously by the Head of Finance in
light of credit rating changes and other market information. 
7.4 Details of how investments are managed are contained in the Treasury
Management Practices (TMPs).  The TMPs are reviewed annually, whilst the

Page 6

treasury policies are reviewed continuously in light of prevailing economic and
market conditions.  It should be noted, however, that the TMPs are to be
reviewed later this year to update the arrangements which have been put in
place to maintain a robust control environment given the move to hybrid
working. 
7.5 The Council generally only invests short-term cashflow surpluses.  Such
investments in total are unlimited, as they are determined by cashflow
balances.  However, investments are limited with each counterparty to ensure
any risk is spread. 
7.6 Longer term investments may arise where the Council has significant cash-
backed reserves or following borrowing in advance of need within the
determined Capital Financing (Borrowing) Requirement.  This has been the
case in the last two years following the increased level of borrowing, with
some funds placed on deposit for up to 24 months.  Longer term investments
potentially carry greater counterparty risk and a higher market risk of adverse
movements in interest rates.  Therefore, such investments are limited to £45
million in total and up to a maximum of three years and are only undertaken
after consideration of cashflow and interest rate forecasts to determine the
optimum duration.  With the increased need for new borrowing over the
coming years, it is anticipated that there will be no investments undertaken for
more than one year. 
7.7 The level of investments is anticipated to fall gradually over the current
financial year.  There are fixed deposits maturing throughout the year, and
more of these will be applied to meet ongoing capital expenditure and not re-
invested as the year progresses.  The total level of investments at the start of
the current financial year was £173.65 million which is anticipated to be the
peak, subject to daily variations, unless further new borrowing is undertaken
during the year or if the profile of the Council’s expenditure during the year
changes. 
7.8 It is anticipated that the following type of investments will be used by the
Council in 2023/24:
• Money Market Funds (MMFs),
• Bank deposits on instant access or notice terms,
• Fixed deposits up to 12 months with banks
• Other local authority lending. 
7.9 Fixed deposits are generally used for cashflow surpluses which are not
required within the next month, whilst investment in MMFs, instant access or
notice accounts vary in line with daily fluctuations in the Council’s cashflow in
order to meet more immediate needs.  The amounts in each are dependent
on several factors, such as changes in cashflow, including long term
borrowing, available rates and market opportunities which may arise.  This
strategy is reviewed continuously in light of updated economic forecasts and
market developments.

Page 7

Local Authority Lending and Borrowing 
7.10 In common with most Councils, Perth & Kinross Council both undertakes
short-term borrowing from and lends to other local authorities across the UK
as permitted investments.  Local authorities are not immune from financial
difficulties and there is specific provision for the reporting and management of
these situations in relation to English local authorities known as a Section 114
notice.  However, unlike commercial entities, the winding-up of a local
authority in England or Scotland can only be authorised by the UK or Scottish
Parliament respectively.  This statutory underpinning means that local
authorities cannot go bankrupt and, therefore, present a very low to negligible
counter-party investment risk.   
Loans to Third Parties 
7.11 The Permitted Investments also include loans to third parties.  Such loans will
be constrained by virtue of the Service having to meet all costs related to such
loans.  All individual loans to third parties must be approved by Council. 
7.12 The submission of Quarterly Treasury and Compliance reports to the Finance
& Resources Committee provide elected members with regular updates on
the Council’s Treasury and Investment activities and an opportunity to
exercise scrutiny over the Council’s Treasury Management arrangements
throughout the year.   
7.13 The Common Good Funds operate with relatively small cash balances and
with no other financial investments.  The Common Good Committees also
have authority to grant loans to third parties, and these are included as
Permitted Investments.  However, the granting of such loans in practice is
rare, with each individual proposed loan requiring the specific approval of the
relevant Common Good Committee.  It is proposed that investments with the
Perth & Kinross Council Loans Fund, together with third party loans, remain
the only Permitted Investments for the Common Good Funds.  It is not
proposed to change the terms under which the Common Good Funds place
deposits with the Loans Fund. 
7.14 In addition, the Common Good Funds hold various properties which generate
rental income, and which are therefore deemed to be Investment Properties,
and covered by the investment regulations. 
7.15 Investments made by any charity or trust administered by the Council are not
within the scope of the Investment Regulations and this Strategy.  However,
any other Council funds that are managed by external investment managers
would be covered by this strategy, and the investment manager would
therefore be bound by this Investment Strategy in relation to those funds.  It is
not proposed to use any external investment manager during 2023/24, other
than for the Council’s charitable funds.

Page 8

8. INVESTMENT PROPERTIES 2023/24 
8.1 Properties held solely to earn rental income and/or for capital appreciation,
and not used by the Council for service delivery or administrative purposes,
are also covered by the Investment Regulations.  Accordingly, an additional
permitted investment category of “Investment Property” has been included in
the list of Permitted Investments.  The Council’s initial limit was established as
“unlimited”, and this remains unaltered. 
8.2 Budgeted gross income from the portfolio in 2022/23 was £1,812,000, with the
out-turn expected to be £1,868,000.  The strategy action plan for the
rationalisation of the commercial property portfolio remains on programme.
Accordingly, the projected income for 2023/24 is £1,866,000. 
8.3 The Annual Property Investment Strategy 2022/23 is attached at Appendix IV
and covers property purchased or managed for the following purposes:
• Socio Economic e.g. precinct shops and community facilities 
• Economic development e.g. Industrial Estates and workshop units
• Revenue generation e.g. St Johns Centre head lease 
8.4 The overall aim of the attached Property Investment Strategy for Perth &
Kinross Council is to support the objectives of the Corporate Plan 2018 - 2023
and in doing so, it meets the requirements of the Regulations. 
9. DEBT RESCHEDULING 
9.1 Debt rescheduling involves prematurely repaying existing loans and replacing
them with new loans at current interest rates.  Any savings in interest costs,
however, must be assessed against the premium payable to the lender to
compensate for their loss of interest.  The amount of premium payable to the
PWLB is calculated based on the difference in the interest rate on the existing
loan and the prevailing interest rates for new borrowing.  The main benefits of
undertaking rescheduling include: 
• Generating interest savings, without exposing the Council to additional
risk,
• Ensuring a better-balanced maturity profile and volatility ratio in the
portfolio,
• Reducing the level of investments, where no replacement borrowing is
undertaken. 
9.2 The PWLB’s premature repayment terms mean that any early redemption of
existing PWLB loans is likely to be prohibitively expensive and unlikely to
generate savings, even whilst rates for new borrowing are currently at higher
levels.  Further, the low average rate and maturity profile of the Council’s long-
term debt mean that it is unlikely that the current portfolio will offer any further
significant opportunities.  Consequently, there is unlikely to be any debt
rescheduling undertaken in 2023/24.  The position will, however, continue to
be monitored to identify any opportunities which may arise.

Page 9

10. THE PRUDENTIAL CODE 
10.1 The Prudential Code requires the Council to set Prudential Indicators for at
least the next three years to ensure that the Council’s plans are affordable,
sustainable and prudent.  To improve longer term strategic and forward
planning, the Council maintains Prudential Indicators for the entire period of
the approved Capital Budget, currently five years to 2027/28. 
10.2 The Council has a statutory duty (under the Local Government in Scotland Act
2003) to determine, and keep under review, how much it can afford to allocate
to Capital expenditure.  The level of Capital Financing Costs (Loan Charges)
strongly influences the level of capital expenditure funded by borrowing and,
therefore, the size of the ongoing Capital programme.  Effective and proactive
Treasury Management aims to minimise these costs and their impact on the
overall finances of the Council, whilst not exposing the Council to undue risk. 
Adverse movements in interest rates, for example, would directly impact on
the level of Capital expenditure which is affordable and sustainable. 
11. PRUDENTIAL INDICATORS 2023/24 to 2027/28 
11.1 The principal means of monitoring and controlling adherence to the Council’s
capital and treasury plans, and ensuring that they remain affordable,
sustainable and prudent, is the determination and monitoring of Prudential
Indicators.  These Indicators must relate to, and be consistent with, the
Council’s approved Capital Budget and Treasury Management Strategy. 
11.2 The proposed Prudential Indicators for 2023/24 to 2027/28 are shown at
Appendix V and are based upon the five-year Composite Capital Budget
approved by the Council on 1 March 2023 (report 23/73 refers) and the five-
year Housing Capital Investment Programme approved by the Housing and
Social Wellbeing Committee on 25 January 2023 (report 23/9 refers). 
11.3 The ratio of estimated Loan Charges: Net Revenue Stream is a measure of
the proportion of the Revenue Budget required to be set aside to meet
ongoing borrowing costs in future years.  The estimates show these to be on a
rising trend, increasing from their current level of 6.4% to 8.7% by 2027/28. 
11.4 The Indicators also include estimates of the Council’s estimated capital
expenditure and the underlying need to borrow for a Capital purpose (Capital
Financing Requirement or Borrowing Requirement) and ensure that the
borrowing periods are consistent with the type of Capital expenditure being
funded. 
11.5 The maximum level of external borrowing that the Council can incur, known as
the Authorised Limit, is currently £1.2 billion for each year from 2022/23 to
2027/28.  Most of the additional borrowing approved by the Council in March
2023 was drawn down from the existing borrowing contingency already
included, with the remaining approved new borrowing being contained within
existing headroom.  Therefore, this limit does not need to be increased at this
time.  Accordingly, the limit remains consistent with the funding strategy for

Page 10

the Council’s Capital plans, Loans Fund estimates and the Medium-Term
Financial Plan.  It is based on total gross external borrowing and long-term
liabilities under PPP/PFI arrangements and takes account of when the
borrowing requirement is at its peak over the period. 
11.6 All the Indicators comply with the CIPFA Code of Practice for Treasury
Management in the Public Services, and will continue to be included and
monitored through the Quarterly Treasury Activity & Compliance reports. 
12. CONCLUSION 
12.1 Treasury operations are undertaken within a dynamic and volatile
environment, which can significantly affect both the cost of borrowing and
returns from investment.  Net annual interest charges in 2022/23 were
approximately £14 million (General Fund and Housing Revenue Account
combined) and are projected to rise significantly to around £33.5 million by
2027/28.  This increase will be managed using the Council’s Capital Fund. 
The setting of an appropriate strategy is, therefore, essential in ensuring that
the Council is not exposed to undue risks and costs.  The strategy outlined in
this report is designed to ensure that the Council achieves the best possible
returns on its borrowings and investments, whilst seeking to minimise risk in
light of prevailing and forecast market conditions. 
12.2 The Investment Strategy outlined in this report covers all matters required by
the Investment Regulations, and lists the proposed Permitted Investments for
2023/24.  These will be reviewed on an ongoing basis as the economic
environment changes and/or new investment products are introduced into the
financial markets.  However, at this time, the proposed Permitted Investments
remain unchanged and there are no proposed changes to investment limits,
nor to the definition of approved counterparties. 
12.3 The Investment Strategy, in conjunction with the Treasury Management
Practices (TMPs), also includes references to the various risks associated
with investments, how these will be controlled, and the considerations and
procedures to be followed.  Security and liquidity of sums invested remain the
primary objectives over investment income.  The proposed Permitted
Investments carry a low level of risk. 
12.4 The report also outlines the link between Treasury Management and the
Capital Budget.  Accordingly, the report proposes revised Prudential
Indicators for the years 2023/24 to 2027/28 consistent with the Council’s
currently approved Capital Budget.  The Prudential Indicators include the
Council’s Authorised Limit for borrowing, which is proposed to remain
unchanged at £1.2 billion.

Page 11

Author(s)
Name  Designation Contact Details 
John Jennings  Senior Accountant  CHXFinance@pkc.gov.uk 
Approved 
Name Designation Date 
Stewart MacKenzie 
Karen Donaldson 
Head of Finance 
Chief Operating Officer 
1 May 2023 
1 May 2023

Page 12

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION  
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  They are as
follows: 
• Tackling Poverty 
• Tackling climate change and supporting sustainable places 
• Growing a sustainable and inclusive local economy 
• Enabling our children and young people to achieve their full potential 
• Protecting and caring for our most vulnerable people   
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all of these objectives. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than
those reported within the body of the main report.

Page 13

Workforce 
2.2 There are no direct workforce implications arising from this report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate discrimination,
advance equality of opportunity, and foster good relations between equality
groups. Carrying out Equality Impact Assessments for plans and policies allows
the Council to demonstrate that it is meeting these duties. 
3.2 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act. However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.6 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
4. Consultation 
4.1 The Chief Executive and the Council’s Treasury advisors, Link Asset
Services, have been consulted in the preparation of this report.

Page 14

2. BACKGROUND PAPERS 
2.1 No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3. APPENDICES 
Appendix I – Outlook for Interest Rates. 
Appendix II – Forecast for Interest Rates (Link Asset Services Ltd). 
Appendix III – Permitted Investments 2023/24. 
Appendix IV – Property Investment Strategy 2023/24 
Appendix V – Prudential Indicators 2023/24 to 2027/28