Page 1

2025
Evidence Report Resubmission

Page 2

2

Page 3

3
Evidence Report Reading Guide
Due to the volume of information that has been reviewed and produced in
the development of our Perth and Kinross LDP3 Evidence Report (the
Report) and its various appendices, this ‘Reading Guide’ aims to help
readers navigate the Report by signposting to its key sections and
providing an explanation as to their content and purpose.  
This Guide takes the format of the Report’s ‘Table of Contents’ grouped
under its chapter headings, to keep it simple and easy to follow. 
Hyperlinks have been provided in their headings to each of the relevant
chapters for quick navigation.  The Evidence Report is divided into 9
chapters, numbered 1 to 9.  It also has 8 appendices referenced A to H. 
Chapter 1 Introduction
This chapter sets the context for the preparation of our LDP3 Evidence
Report.  It outlines the purpose of the Report, the key legislative, form and
content requirements for preparing an Evidence Report, and where these
have been addressed in the Report, and finally, the scope of information to
be included within it.  Chapter 1 also provides information on the updates
made to the Council’s March 2025 Approved Evidence Report in line with
the Reporter’s recommendations received in July 2025.  
Chapter 2 Profile of the Plan Area
Chapter 2 provides a response to specific asks within the Planning
(Scotland) Act 2019, which requires planning authorities to provide
information on the principal characteristics of the area which the Plan will
cover.  Those principal characteristics cover the physical, cultural,
economic, social, built heritage, and environmental.  
The chapter also provides information relating to the principal purposes
for which the land within the LDP3 Area (the Plan Area) is used; the size,
composition, health and distribution of the population of the Plan Area;
any rural areas experiencing population decline, and an overview of the
health and education needs of the population, and the capacity of
education services. 
Chapter 3 Participation and Engagement Statement
Chapter 3 forms our required ‘Participation and Engagement Statement’. 
It provides details of how, in preparing our Evidence Report, Perth and
Kinross Council has sought the views of key stakeholders, as set out in Part
2 of the Planning (Scotland) Act 2019, and the extent to which those views
expressed during engagement exercises have been considered.  
Chapter 4 Local Development Plan 2 Monitoring
This chapter considers how effective the implementation of our Perth and
Kinross Local Development Plan 2 (LDP2) has been since it was adopted in
November 2019.  It concentrates on those matters suggested in the
Scottish Government’s May 2023 LDP Guidance i.e. the delivery of the
Plan’s outcomes and allocations, lessons learnt, and consideration of the
appropriateness of the previous spatial strategy.

Page 4

4
Chapter 4 is also supported by Appendix G: LDP2 Policy Review, which
provides the outcomes of an evaluation of our LDP2 policies in light of the
introduction in February 2023 of National Planning Framework 4’s (NPF4)
National Planning Policy suite.
Chapter 5 Overview of Issues and Position Statement
Chapter 5 outlines the approach taken by Perth and Kinross Council (the
Council) in collating the relevant information for each of the 32 separate
topics or issues covered by this Report, as well as a summary overview of
those issues and their evidence.  
Summary of Evidence
To reduce the size of the main Evidence Report document, the full detailed
evidence review for each of the 32 issues has been placed in appendices. 
As such, Chapter 5 is supported by and should be read with Appendices A
to E for those specific issues.  These appendices provide the detailed
summary of evidence, implications for the Proposed Plan, any gaps, issues
or uncertainties arising from the evidence reviewed, a summary of
stakeholder engagement, and how those views expressed have been taken
into account in producing this Report, and finally they also include
statements of agreement and dispute for each issue.  
Issues Covered
The list of issues within this Report primarily follows that of National
Planning Policy under NPF4 and has been grouped under the 3 themes of
Sustainable, Liveable and Productive Places.  Where appropriate, some
related NPF4 policies have been grouped together reflecting the inter-
connected nature of those policies.  
In recognition of the importance of the issues of Homes, Transportation,
and Infrastructure to the development and delivery of LDP3, these issues
have been brought out under separate headings.  The Infrastructure issue
has also been further subdivided into: Cemetery Provision; Transportation
(including Sustainable Transport); Communications and Digital; Education
Facilities; Health Care Facilities, and Waste Water Treatment and Water
Supply.
Gaps, Uncertainties and Key issues Arising, and Position Statement 
Finally, Chapter 5 provides an overview table highlighting any gaps,
uncertainties and key issues associated with the issues, a Table of Disputes
to the Evidence Report, and a Position Statement. 
Chapter 6 Key Issues for LDP3 Spatial Strategy
Chapter 6 includes a summary of the main issues identified through a
review of the evidence grouped under the 3 NPF4, and Homes, and
Infrastructure and Transportation themes.  For each of the 30 issues
covered by this Report relevant key policy and other connections have also
been identified in the tables in Chapter 6.  
Chapter 7 Links to SEA
Chapter 7 considers the links between the Evidence Report and Strategic
Environmental Assessment (SEA) processes, and the benefits to the

Page 5

5
development of LDP3 which can be gained from aligning the SEA and plan
preparation processes.  A combined approach was taken to the data
gathering and analysis for the LDP3 SEA Scoping Report and Evidence
Report. 
Chapter 8 Local Place Plans
Chapter 8 outlines the steps taken by the Council in inviting local
communities to prepare Local Place Plans, and the assistance provided to
them. 
Chapter 9 Approval Process and Next Steps
Chapter 9 sets out the approval process to be followed for the Report, and
the next steps in terms of resubmission to Gate Check.  
Appendix A Sustainable Places Issues
Appendix A provides detailed summaries for the issues of: Tackling the
Climate and Nature Crises, Biodiversity and Natural Places; Soils; Forestry,
Woodland and Trees; Historic Assets and Places; Green Belts; Brownfield,
Vacant and Derelict Land and Empty Buildings; Coastal Development and
Aquaculture; Energy, Heating and Cooling (including Infrastructure: Energy
Supply Systems), and Zero Waste.  Appendix A supports and should be
read alongside the above issues under Chapter 5 of the Evidence Report.
Appendix B Liveable Places Issues 
Appendix B provides detailed summaries for the issues of: Design, Quality
and Place; Local Living and 20 Minute Neighbourhoods; Blue and Green
Infrastructure; Play, Recreation and Sport (including Play Sufficiency
Assessment); Flood Risk and Water Management (including Drainage and
Water Supply Systems), and Health and Safety.  Appendix B supports and
should be read alongside the above issues under Chapter 5 of the
Evidence Report.
Appendix C Homes  
Appendix C provides a detailed summary for the Homes issue.  It supports
and should be read alongside the relevant issue under Chapter 5 of the
Evidence Report.
Appendix D Infrastructure and Transportation Issues 
Appendix D provides detailed summaries for the Infrastructure and
Transportation sub-issues of: Cemetery Provision; Communications and
Digital Infrastructure; Education Facilities; Health Care Facilities;
Transportation (including Sustainable Transport), and Wastewater
Treatment and Water Supply.  Appendix D supports and should be read
alongside the above issues under Chapter 5 of the Evidence Report.
Appendix E  Productive Places Issues 
Appendix E provides detailed summaries for the issues of: Community
Wealth Building; Business and Industry; Retail, City, Town, and Commercial
Centres; Rural Development; Tourism; Culture and Creativity, and
Minerals.  Appendix E supports and should be read alongside the above
issues under Chapter 5 of the Evidence Report.

Page 6

6
Appendix F Other Comments Received 
Appendix F sets out those comments received during the consultation
exercise on our suite of LDP3 Evidence Report Topic Papers which were
considered more appropriate to the Proposed Plan stage of the LDP3
preparation process, either due to their place or site specific nature, or
they were submitted in relation to Topic Paper 001: The Plan Area, which
provided context for the key characteristics of the Plan Area and does not
correspond with specific NPF4 policy issues.   
Appendix G LDP2 Policy Review 
Appendix G supports Chapter 4 of the Report.  It provides the outcomes of
an evaluation of our LDP2 policies in light of the introduction in February
2023 of National Planning Framework 4’s (NPF4) National Planning Policy
suite.
Appendix H Site Assessment and SEA Checklist
Appendix H provides the proposed site assessment template for assessing
site proposals for incorporation into the Proposed Plan.  The template was
developed by the SEA Consultation Authorities and incorporates SEA
considerations into the site assessment process.

Page 7

7

Page 8

8
Table of Contents
Evidence Report Reading Guide 33
Glossary of Terms and Abbreviations 1010
1 Introduction 1111
Form and Content Requirements – Evidence Reports 1111
Style and Scope of Evidence Report 1111
2 Profile of the Perth and Kinross Area 4142
Principal Characteristics of the Area 4142
Physical Characteristics
4142
Cultural Characteristics
5152
Economic Characteristics
5556
Social Characteristics
6061
Built Heritage Characteristics
6162
Environmental Characteristics
6263
Principal Purposes for which the Land is Used 6465
Size, Composition, Health and Distribution of Population of the Area 6768
Rural Areas and Population Decline 7475
Health Needs of the Population of the Area 7879
Education Needs of the Population of the Area and Service Capacity 7980
3 Participation and Engagement 8384
Participation and Engagement Statement 8384
4 Perth and Kinross LDP2 Monitoring 9798

Page 9

9
Delivery of Perth and Kinross Local Development Plan 2 9798
5 Evidence Gathering - Information on Issues 121122
Approach Taken to the Collation of Evidence 121122
Format of Chapter 5 121122
Gaps, Uncertainties, and Key Issues Raised 123124
Table of Gaps, Uncertainties and Key Issues Raised in Evidence 124125
Position Statement and Table of Disputes 136137 
Position Statement 137138 
Table of Disputes 138139
Sustainable places 160161 
Liveable Places 196197 
Homes 223224 
Infrastructure and Transportation 231232
Productive Places 250251
6 Summary of Key Issues for the LDP3 Spatial Strategy 274275
Summary of Main Issues by Theme and Key Policy Connections 274275
Sustainable Places 275276
Liveable Places 285286
Homes 291292
Infrastructure and Transportation 292293
Productive Places 297298
7 Links to Strategic Environmental Assessment 303304
Requirement for SEA: Perth and Kinross Local Development Plan 3 303304
Benefits of SEA 303304
Next Steps 304305
8 Local Place Plans 305306
Invitation to Prepare Local Place Plans 305306
Assistance Provided to Local Communities 306307

Page 10

10
9 Approval of Evidence Report 307308
Approval Process and Next Steps 307308
Glossary of Terms and Abbreviations
Gate Check This is an assessment of the sufficiency of the evidence base on which the Proposed Local Development Plan
will be developed. It is undertaken by an appointed person from the Scottish Government’s Planning and
Environmental Appeals Division.
Historic Assets As defined in Historic Environment Policy 2019, an asset, or historic or heritage asset ‘is a physical element of
the historic environment – a building, monument, site, place, area or landscape identified as having cultural
significance. 
Historic Environment As defined in Historic Environment Policy 2019, ‘the historic environment is our surroundings as they have
been shaped, used and valued by people in the past, and continue to be today.  It is central to our everyday
life lives and our sense of place, identity and wellbeing. 
Local Development Plan (LDP) A plan which sets out, for the land in the part of the district it relates to, a spatial strategy; any other such
matters as may be prescribed by the Scottish Ministers, and any other matters which the planning authority
consider appropriate to include.  
National Planning Framework 4 (NPF4) NPF4 is the national spatial strategy for Scotland.  It sets out the Scottish Government’s spatial principles,
regional priorities, national developments, and includes a suite of national planning policy.  NPF4 was
adopted in February 2023.lProposed Plan  The draft stage of the Local Development Plan, which must
be approved by full Council before it can move on to its consultation stage.
Reporter A Reporter is the person appointed on behalf of the Scottish Ministers to assess if an Evidence Report is
sufficient to allow planning authorities to proceed to the next stage of preparing a Proposed Plan. 
Spatial Strategy  The detailed statement (usually represented through mapping as well accompanying text) of a planning
authority’s policies and proposals regarding the development and use of land for the area for which the plan
applies.
Strategic Environmental Assessment (SEA) A systematic way of identifying, predicting, reporting, mitigating, and monitoring the environmental effects of
plans, programmes, policies, and strategies.  The Environmental Assessment (Scotland) Act 2005 provides
information on the detailed stages and requirements for SEA in Scotland.

Page 11

11
Sustainable Development As defined in 1987 by the Brundtland Report: Our Common Future, it is development which meets the needs
of the present without compromising the ability of future generations to meet their own needs.  
Sustainable Economic Growth Economic development that is conducted in a manner which does not lead to the depletion of natural
resources.

Page 12

12
1 Introduction
1.1 Under Section 16(B)(1) of the 2019 Planning Act 0F
1, planning
authorities are required to prepare an Evidence Report before
preparing a Local Development Plan.  An Evidence Report should
contain sufficient information to enable the planning authority to
move on to the next stage and prepare their Local Development
Plan (LDP).
1.2 The purpose of an Evidence Report is to provide the planning
authority’s interpretation of the evidence it has gathered and the
likely implications of that evidence for the preparation of their
LDP.  The Report will provide a summary of what the evidence
means for the plan, rather than contain all the detail of evidence
collected. 
FORM AND CONTENT REQUIREMENTS –EVIDENCE REPORTS
1.3 The 2019 Act sets out the detailed requirements with regards to
the preparation of Evidence Reports, including their form,
content, consultation and engagement expectations, and approval
processes.   The Scottish Government’s May 2023 Local
Development Plan Guidance (Core Doc Ref: CD002) also provides
useful step by step advice and guidance regarding the preparation
of Evidence Reports to assist planning authorities in meeting their
1 The Town and Country Planning (Scotland) Act 1997, as amended by the Planning
(Scotland) Act 2019 (Core Doc Ref: CD001)
legislative requirements under both the Act and Development
Planning Regulations1F
2. 
1.4 Table 2 to follow later in this chapter lays out the key prescribed
requirements for our Perth and Kinross LDP3 Proposed Evidence
Report and identifies under which section of this report those
requirements have been addressed.  Chapters 2 to 8 constitute
our LDP3 Proposed Evidence Report.
STYLE AND SCOPE OF EVIDENCE REPORT
1.5 The Report takes an issue-based approach and in the main reflects
the list of policy topics contained in NPF4 (Core Doc Ref: CD003),
although some NPF4 policy topics have been grouped together
due to the inter-connected nature of the subjects. The
information for each issue follows the template suggested in the
LDP Guidance and provides a systematic, consistent and
transparent approach to the analysis and interpretation of the
evidence.  Due to the volume of information these templates are
provided in Appendices AEG, with summaries of the information
included within the relevant chapters of the document.
2 The Town and Country Planning (Development Planning) (Scotland) Regulations 2023
(Core Doc Ref: CD004)

Page 13

13
EVIDENCE REPORT RESUBMISSION
1.6 The submission of our LDP3 Evidence Report to Scottish Ministers
was approved at a meeting of Full Council on 5 March 2025, and
the Approved Evidence Report was submitted to the DPEA for
Gate Check on 27 March 2025.  
1.7 The Gate Check decision was issued by the DPEA on 8 July 2025. 
The Reporter’s assessment was that the Evidence Report collates
a large amount of information and appears to be a largely
comprehensive overview of the evidence available to Perth and
Kinross Council at the time of preparation.  However, they found
that evidence on some fundamental matters was missing, and as
such returned the report on the basis that it does not contain
sufficient information to enable Perth and Kinross Council to
prepare a local development plan.  
1.8 In particular, the Reporter found that the Evidence Report
submission did not provide the Council’s view, as the planning
authority, on the capacity of education services in the district,
required by sections 16B(3)(a) and 15(5) of the 2019 Planning Act.  
1.9 Furthermore, it was also their view that there was not sufficient
information in the report submission, with respect to a number of
identified gaps relating to emerging reports, strategies and
analysis that remained outstanding at the time of submission, to
enable us, as the planning authority, to prepare Local
Development Plan 3.  
1.10 Consequently, the Evidence Report was returned to the Council to
have amendments made.  The Reporter’s assessment report
contained the detailed reasons for this decision and set out a list
of recommendations for improvement.  The Evidence Report has
been updated in line with these recommendations for submission. 
Table 1 to follow sets out the further detail with respect to these
updates and forms the main basis of our resubmitted report.  The
list of recommendations in Table 1 has been colour-coded with a
key provided to identify the different categories of the actions
required by the Council in addressing them.

Page 14

14
Table 1: List of Reporter’s Recommendations and the Council’s Related Actions 
Key:
Insufficient evidence –maers to be addressed in Evidence Report Resubmission.
A clearer commitment and mescale could usefully be provided in the Evidence Report Resubmission.
Would appear to be available at the me to include in Evidence Report Resubmission.
Opportunity to include further informaon in Evidence Report Resubmission.
Further consideraon to be given in order to inform preparaon of Proposed Plan.
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
Annex A - Education
Capacity
Reporter’s Comments:
This section of the evidence report does not present a clear picture of the
existing and projected education capacity in the council area. At page 8 of
Issue 20 it is stated that capacity levels will be set out, but this information
should have been included within the evidence report itself. I would have
expected this analysis to include forecasting of future capacity based on
current demographic trends and committed development. This could most
usefully have been achieved with a clear table setting out which schools
were forecast to have spare capacity, and which were at or approaching
capacity, over the projected plan period. I do not consider that the broad
high level statements that are provided on this topic are sufficient or can be
said to fully or adequately describe the current and projected capacity of
schools in the plan area.
This is an important matter related to a legislative provision. Section 15(5) of
the Act includes the capacity of education services in the district among the
matters that the authority is expected to set out their views in the evidence
report. The fact that the authority commits to carrying out this work going
forward indicates that this is not an excessively onerous or technically
This Evidence Report
Resubmission has been amended
accordingly at Chapters 5 and 6,
Issue 020: Education Facilities,
and Appendix D Issue 020:
Education Facilities. 
Appendix D has been updated
with detailed information on the
current position of the School
Estate including tables showing
current and future school rolls
over the projected plan period.
RAG maps have also been added
to show the information spatially.
An overview of the capacity
situation including the impact of
potential pupils from house

Page 15

15
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
difficult task. No reasons are given as to why this analysis has not already
been done and presented in the report.
Particularly in the primary sector, the matter of the capacity and sufficiency
of existing schools is important given the council’s apparent desire to
continue to seek developer contributions to fund new provision. The council
can no longer rely on statutory supplementary guidance to set out the
principles of its policy on developer contributions, and so it is particularly
important that the evidential justification for any such contribution policies
is set out in the preparation of the proposed plan.
Further explanation could also be usefully provided as to how education
colleagues have been involved in the preparation of this part of the evidence
report.
I have carefully considered whether this matter merited the return of the
report.  I am conscious that the volume of new land release in the
forthcoming plan may be modest, and that it may be that education matters
relating to existing strategic releases have been largely resolved.  The gap
may be of less significance in the secondary sector where no developer
contributions are anticipated.  However, I cannot overlook the specific
legislative requirement relating to this matter.  It is also important for me to
avoid sending a signal to other authorities that this detail is a matter
appropriately addressed at a later stage.  That is not the case. 
Conclusion and Recommendations:
For the reasons stated, I find the evidence report to be insufficient with
regard to education capacity.  I recommend that the authority addresses this
matter by: 
 Clearly setting out (perhaps in tabular form) existing and projected
school rolls (taking account of demographic change and committed
development) over the plan period;
 Describing any planned or programmed improvements or changes to
the school estate that could affect capacity;
building within each LMG is
provided along with information
on the planned or programmed
improvements to the school
estate. The evidence sources on
which the updated evidence is
based have been identified and
provided. Updates have been
made to the implications for the
proposed plan. 
Chapters 5 and 6 which
incorporate summary
information from Appendix D
have been updated accordingly.

Page 16

16
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
 Identifying the parts of the plan area likely to be constrained due to
school capacity issues, or where further intervention would be required
to enable growth;
 It would be helpful if the report could also discuss the interventions
necessary to resolve these constraints (e.g. catchment reviews,
extensions or new schools), though I do not consider this to be
essential;
 Identifying and providing the evidence sources on which this evidence
is based (hyperlinks will suffice); and
 Summarising the implications of this evidence for the proposed plan.
Annex B6 – Issue 002.
Biodiversity and
Natural Places, and
Annex C8 – Issue 002
A review of the Tayside
Biodiversity Partnership
LBAP
Text included in Evidence Report:
Will coincide with the development of the Proposed Plan.
Reporter’s Comments:
I would have expected to have seen some discussion of the council’s
Biodiversity Duty Report.  The council should consider the implications of
this document in the revised report, or as it moves forward to prepare the
proposed plan.
Recommendation:
A clearer commitment and timescale could usefully be provided in the
revised report.
The Biodiversity Duty covers the
three-year period from January
2021 to December 2023. The next
report will cover the period from
January 2024 to December 2026
and will be published in
December 2026. Enhancing
biodiversity - Perth & Kinross
Council.  
Evidence Report Resubmission
has been amended to add a
summary of the Council’s
Biodiversity Duty Report in
Appendix A: Sustainable Places,
Issue 002: Biodiversity and
Natural Places.  The Council will
consider the implications of this
Report in the preparation of our
Proposed Plan.
Review of the Tayside Local
Biodiversity Action Plan 2016-
2026 is underway as of October

Page 17

17
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
2025 and will coincide with the
preparation of the Proposed Plan. 
We will work closely with the
Tayside Biodiversity Partnership
to ensure the Proposed Plan and
Nature Networks are
complementary to the ambitions
of the forthcoming LBAP.
Evidence Report Resubmission
has been amended accordingly at
Chapter 5: Gaps, Uncertainties
and any Key Issues Raised in
Evidence, and within Appendix A,
Sustainable Places, Issue 002:
Biodiversity and Natural Places
Local Biodiversity Sites
Programme
Text included in Evidence Report:
Will not be complete until mid-2025.
Reporter’s Comments:
Would appear to be available at the time to include in revised report.
Assessment of Local Biodiversity
Sites will be complete by early
2026. Adoption anticipated Q3
2026.
Evidence Report Resubmission
has been amended accordingly at
Chapter 5: Gaps, Uncertainties
and any Key Issues Raised in
Evidence, and within Appendix A,
Sustainable Places, Issue 002:
Biodiversity and Natural Places
Nature Networks Text included in Evidence Report:
Further engagement is ongoing and is likely to run through 2025 for
landscape scale Nature Networks, which will be developed alongside green
infrastructure and green network identification.
Reporter’s Comments:
Identification of draft Nature
Networks will be complete by
early 2026 with further
engagement through 2026
alongside plan preparation

Page 18

18
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
Would appear to be available at the time to include in revised report. Evidence Report Resubmission
has been amended accordingly at
Chapter 5: Gaps, Uncertainties
and any Key Issues Raised in
Evidence, and within Appendix A,
Sustainable Places, Issue 002:
Biodiversity and Natural Places
Annex B6 – Issue 004.
Forestry, Woodland
and Trees
Forestry and Woodland
Strategy (FWS)
Text included in Evidence Report:
Will require a review.
Reporter’s Comments:
A clearer commitment and timescale could usefully be provided in the
revised report.
A draft FWS is under preparation. 
The draft document is
programmed for consideration at
a meeting of the Economy &
Infrastructure Committee in April
2026 Consultation and
engagement to take place during
Spring 2026, with publication of
FWS expected late Summer 2026.
Evidence Report Resubmission
has been amended accordingly at
Chapter 5: Gaps, Uncertainties
and any Key Issues Raised in
Evidence; under the summary
provided in Chapter 5, Issue 004:
Forestry, Woodlands and Trees,
and in Appendix A: Sustainable
Places, Issue 004: Forestry,
Woodland and Trees
Annex B6 – Issue 005.
Historic Assets and
Places
Conservation Area
Appraisals (CAAs)
Text included in Evidence Report:
A rolling review programme in place for reviewing our list of CAAs which is
expected to be completed during 2025-26.
Reporter’s Comments:
Would appear to be available in time to include in revised report.
A rolling programme is in place
to review our Conservation
Areas and the list of
Conservation Area Appraisals.
Our approach to this will be to
group areas by location; to
prioritise areas where the last

Page 19

19
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
appraisal or review was some
considerable time ago; and to
provide an appraisal where none
is currently in place. It is
expected that this will be an
ongoing process where priorities
may shift over time, and the
process is expected to last
beyond the period of the next
LDP. The first three reviews
(Birnam, Dunkeld, and
Spittalfield) are being finalised,
and Perth will be the next area
to be reviewed in 2026.
Annex B6 – Issue 006.
Green Belt and Annex
C9-11
Green Belt Review Text included in Evidence Report:
The timing of the review will be important as it will need to be informed by
other pieces of work, such as the locality profile work, work on 20 minute
neighbourhoods, and the spatial strategy itself.  For this reason, it was not
considered appropriate to carry out the green belt review at Evidence
Report stage.  It will, however, need to be undertaken prior to the site
selection process.
Reporter’s Comments:
As acknowledged in the evidence report, NPF4 expects green belts to be
reviewed as part of the preparation of LDPs. The Local Development
Planning Guidance states that evidence is required to inform detailed green
belt boundaries.
The evidence report commits the council to carry out such a review ahead of
the proposed plan.
I accept that there may be valid reasons to delay the finalisation of any
review until after the evidence report stage so that it can be considered in
parallel with the development of the spatial strategy, and when the scale of
the need for additional land release is better understood. However, it is
As recommended, some of the
initial components of the Green
Belt review have now been
undertaken including:
 A review of planning
application data to identify
new development and areas
of pressure or change
 The identification of some of
the major land uses and
business within the Green
Belt
 An initial review of the
contribution of different
parts of the Green Belt to
meeting the NPF outcomes.

Page 20

20
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
disappointing, and a gap in the evidence, not to see some of the building
blocks that will feed into the review more fully presented in the evidence
report. This could have included more work around new development and
development pressures since the last review, the presence of major
businesses and uses, landscape change since the last review, and the
ongoing contribution of different parts of the green belt to the outcomes set
out in NPF4. It is stated that it would have been inappropriate to carry out
the review prior to other pieces of work relating to locality profiling and 20-
minute neighbourhoods being in place, but ideally these exercises would
also have been completed in time to feed into the evidence report. I advise
that work on the green belt review is now advanced timeously with the
involvement of relevant stakeholders.
I note that the key for Figure 2 of Issue 6 appears to mix up the notations for
the proposed and adopted green belt. 
Recommendation:
While some valid reasons have been given for delaying the full review until
closer to the publication of the proposed plan, there may be opportunities
to include various contributory components in any revised report.  These
components could include new development and development pressures
since the last review, the presence of major businesses and uses in the green
belt, landscape change since the last review, and the ongoing contribution of
different parts of the green belt to the outcomes set out in NPF4.
Evidence Report Resubmission
has been amended accordingly at
Chapter 5, Issue 006: Green Belts
and , Appendix A: Sustainable
Places, Issue 006: Green Belts
Annex B6 – Issue 007.
Brownfield, Vacant
and Derelict Land,
and Empty Buildings
Register of potential
brownfield regeneration
sites/ urban capacity study
Text included in Evidence Report:
A pilot exercise has so far been undertaken. The process has been reviewed
and refined and will be rolled out across the Perth and
Kinross area.
Reporter’s Comments:
A potentially important piece of work, the outputs of which could have
significant implications for regeneration and land supply. A clearer
commitment and timescale could usefully be provided in the revised report.
Agreed and the Evidence Report
Resubmission has been amended
accordingly at Chapter 5, Issue
007: Brownfield, Vacant and
Derelict Land, and Empty
Buildings, and Appendix A:
Sustainable Places, Issue 007:
Brownfield, Vacant and Derelict
Land, and Empty Buildings

Page 21

21
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
Annex B6 – Issue 008.
Coastal Development
and Aquaculture
Coastal Change Adaptation
Plan
Text included in Evidence Report:
The Council has received funding, and if it is available timeously it will inform
the Proposed Plan.
Reporter’s Comments:
A clearer commitment and timescale could usefully be provided in the
revised report.
The original plan was to use the
Phase 1 funds to inform a Coastal
Change Adaptation Plan, but
given the short length of PKC
coastline, and limited receptors,
an alternative approach was
taken.  Also, it is noted that there
are no areas shown at risk in the
Dynamic Coast webmaps Future
Erosion 2100 High Emissions
scenario. Funds received were
used for alternative coastal wall
repair project as agreed with
Scottish Government. To date
PKC has not received funding
from later phases but if a Coastal
Change Adaptation Plan is
prepared it would inform LDP3
Proposed Plan. 
The Evidence Report
Resubmission has been amended
accordingly under Chapter 5,
Issue 008: Coastal Development
and Aquaculture, and Appendix
A, Sustainable Places, Issue 008.
Annex B6 – Issue 009.
Energy, Heating and
Cooling, and Annex
C12
Formal Designation of Heat
Network Zone (HNZ)
Text included in Evidence Report:
Still to take place. 
Reporter’s Comments:
The council is yet to identify any HNZs as required by the Heat Networks
(Scotland) Act 2021.  I note that designating such a zone is a key action of
the LHEES and a list is provided of potential zones.  However, it would have
Key considerations are still to be
considered as part of the drafting
of the Heat in Buildings Bill,
including a potential power for
local authorities to require any
building owner to end their use of
polluting heating once they have
the opportunity to connect to a

Page 22

22
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
been preferable for the evidence report to have also included a clear
commitment and a timescale for this work.
No timescale given.  A clearer commitment and timescale could usefully be
provided in the revised report.
heat network.  Scottish
Government is currently unable
to provide clarity about the role
of heat network zones, required
connections and planned next
steps in the designation
process.  Given these
uncertainties a clear commitment
and timescale s not possible at
this point. 
Perth HNZ has progressed the
furthest, but further work is
required to refine and develop
the Strategic Outline
Case/Outline Business Case and
financial model. There is also
parallel work being progressed to
bundle the Perth Strategic Heat
Network alongside other low
carbon energy projects to
procure a Strategic Energy
Partner (SEP).  A SEP will likely
carry out their own technical and
commercial feasibility work. Both
workstreams may impact the
proposed Perth HNZ boundary
and the latter may also help
define other HNZs.
To allow HNZ boundaries to be
defined at the appropriate stage,
and be supported by the LDP, it is
envisaged that LDP3 will have a

Page 23

23
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
heat network policy which will
signpost to a separate designated
heat network zones
document/web map.  This
approach also aligns with Fife
Council and will allow PKC to
identify and update HNZs as
required. 
This Evidence Report
Resubmission has been amended
accordingly under Chapter 5,
Gaps, Uncertainties and any Key
Issues Arising in Evidence, Issue
009: Energy, Heating and Cooling,
and within Appendix A,
Sustainable Places, Issue 009. 
Renewable Energy
Guidance
Text included in Evidence Report:
Programmed to be updated in 2025.
Reporter’s Comments:
Would appear to be available in time to include in revised report.
A draft of the Council’s
Renewable and Low Carbon
Energy Guidance was published
for a period of consultation from
5 September until 17 October
2025.  The comments received to
the draft document are currently
being reviewed and will be used
to inform the drafting of the final
version of the guidance which will
be taken to committee for
approval prior to publication
during Spring 2026. 
This Evidence Report
Resubmission has been amended
accordingly under Chapter 5,

Page 24

24
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
Issue 009: Energy, Heating and
Cooling, and Appendix A,
Sustainable Places, Issue 009. 
Annex B6 – Issue 010.
Zero Waste, and
Annex C13
Waste Management Plan Text included in Evidence Report:
Covers the period 2010-2025 but is likely to be updated.
Reporter’s Comments:
I note the statement at pg6 of Issue 10 that ‘recent information on waste
sites and capacities, together with recent data on how household waste is
handled show that sufficient capacity exists’.  This information and data
does not seem to have been presented in the evidence report.  It is
therefore hard to judge the accuracy of this statement.  Possibly the new
facility at Glenfarg will provide all the necessary capacity, but this is not
explicitly stated.  I advise that these matters are clarified.aNo timescale
given.  If replacement plan still not available to describe in the revised
report, a clear commitment and timescale could usefully be provided.
PKC has begun the process of
developing a Circular Waste Plan,
which will incorporate a Waste
Management Plan.  It is in the
early stages of development, with
an expected timeframe for
delivery of an approved plan in
2029. 
In terms of the recent
information on waste sites and
capacities, this information was
provided in the original Evidence
Report submission, in both the
’Table of household waste data
(percent) 2019-2023’ and the
‘Table of all waste – sites and
capacity – Perth and Kinross –
2019-2023’ on page 4 of Core
Document CD067 Appendix A,
Sustainable Places, Issue 010:
Zero Waste  The text on page 6 of
Issue 010 in Appendix A has been
updated to clarify this is what the
paragraph is referring to
whenever it notes sufficient
capacity exists. 
Annex B6 – Issue 013.
Blue and Green
Open Space Audit Text included in Evidence Report:
Not expected until Summer 2025.
Reporter’s Comments:
The Open Space Audit is
progressing, with all LDP2
designated open spaces having
been audited. The engagement

Page 25

25
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
Infrastructure (BGI),
and Annex C14
Would appear to be available in time to include in revised report. has flagged over 100 smaller
greenspaces valued by
communities that still require site
visits.  While an initial desk-based
assessment of environmental
quality has been carried out, the
remaining site visits will depend
on resource availability.
Tiered settlements are projected
to be complete by the end of
2026, with the remaining smaller
settlements to be completed by
the end of Q1 in 2026..
This Evidence Report
Resubmission has been amended
accordingly in Chapter 5 under
the Gaps, Uncertainties and any
Key Issues Raised in Evidence
section, and Issues 013: Blue and
Green Infrastructure and 014:
Play, Recreation and Sport. 
Updates have also been made to
Appendix B, Liveable Places,
Issues 013: Blue and Green
Infrastructure and 014: Play,
Recreation and Sport. 
Open Space Strategy Text included in Evidence Report:
To follow at the end of 2025.
Reporter’s Comments:
Would appear to be available in time to include in revised report.
The Open Space Strategy is
programmed to go to Committee
in August 2026.
A policy scoping exercise was
completed in Q3 2025, and a
draft policy framework will be

Page 26

26
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
ready for internal review by the
end of the year.
Open Space Audits are being
completed alongside the Locality
Profile exercise, with tiered
settlements being prioritised.
The audit has flagged locations
where interventions are required.
We have determined that the
settlement strategies to be
included in the OSS will be more
effective to develop alongside
LDP3. This enables us to consider
where growth will be directed
and where we can leverage on-
site or off-site contributions to
deliver requirements identified in
the audit. This Evidence Report
Resubmission has been amended
accordingly in Chapter 5 under
the Gaps, Uncertainties and any
Key Issues Raised in Evidence
section, and Issues 013: Blue and
Green Infrastructure and 014:
Play, Recreation and Sport. 
Updates have also been made to
Appendix B, Liveable Places,
Issues 013: Blue and Green
Infrastructure and 014: Play,
Recreation and Sport.
BG Infrastructure – General Reporter’s Comments:
While issue 13 highlights the various items of available evidence on this
topic, little strong sense emerges from the evidence report itself of the
We have produced an internal
blue-green network (BGN) map
that is being used to inform

Page 27

27
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
nature and qualities of the BGN in the area, or of the threats and
opportunities affecting it that could potentially be addressed in the
forthcoming plan.  The authority should consider these matters further.
locality profiling work. The
profiles include narrative on the
BGN qualities, threats and
opportunities at a local level. This
will inform the development of
the Proposed Plan at these
locations. These in depth analysis
will help to create a PKC-wide
summary in the forthcoming OSS.
Annex C15 – Issue
014. Play, Recreation
and Sport
Open Space Audit and
Strategy Reporter’s Comments:
The open space audit and open space strategy will be key evidence sources
for the forthcoming plan that may have a cross-cutting impact across a
range of policy areas. While it is welcome that these exercises are underway
and due to report soon, it is therefore disappointing that they were not
ready in time to be presented in the evidence report where their
implications could be considered in the round. It is to be hoped that these
exercises are now either complete or nearing completion in order to allow
their implications to be assessed in the revised evidence report and in the
preparation of the proposed plan.
The Open Space Audit is
progressing, with all LDP2
designated open spaces having
been audited. The engagement
has flagged over 100 smaller
greenspaces valued by
communities that still require site
visits. While an initial desk-based
assessment of environmental
quality has been carried out, the
remaining site visits will depend
on resource availability.
Tiered settlements are projected
to be complete by the end of
2026, with the remaining smaller
settlements to be completed by
the end of Q1 in 2026.
The Open Space Strategy is now
expected to go to committee in
August 2026.
A policy scoping exercise was
completed in Q3 2025 and a draft
policy framework will be ready

Page 28

28
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
for internal review by the end of
the year.
Open Space Audits are being
completed alongside the Locality
Profile exercise, with tiered
settlements being prioritised.
The audit has flagged locations
where interventions are required.
We have determined that the
settlement strategies to be
included in the OSS will be more
effective to develop alongside
LDP3. This enables us to consider
where growth will be directed
and where we can leverage on-
site or off-site contributions to
deliver requirements identified in
the audit. 
Furthermore, this enables us to
address in the OSS the
implications for PKC’s Community
Greenspace service regarding
adoption and maintenance
requirements arising from
LDP3.This Evidence Report
Resubmission has been amended
accordingly in Chapter 5 under
the Gaps, Uncertainties and any
Key Issues Raised in Evidence
section, and Issues 013: Blue and
Green Infrastructure and 014:
Play, Recreation and Sport. 
Updates have also been made to

Page 29

29
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
Appendix B, Liveable Places,
Issues 013: Blue and Green
Infrastructure and 014: Play,
Recreation and Sport.
Annex B6 – Issue 015.
Flood Risk and Water
Management
Surface Water
Management Plans
(SWMP)
Text included in Evidence Report:
A surface water management plan is currently being prepared for several
communities. The initial phase of the Perth Surface Water Management Plan
is estimated to complete in Spring 2025.
Reporter’s Comments:
Would appear to be available in time to include in revised report.
The Perth SWMP is subject to
public consultation and will likely
be considered at the Council’s
Climate Change and Sustainability
Committee 27th May 2026. 
Unfortunately, the work is
unlikely to recommend any
feasible schemes. However, two
sites at Whitefriars and Dewars
have provisionally been
identified, and LDP3 will consider
the opportunity to help deliver
site improvements. Likely
mechanisms would be through
site specific developer
requirements associated to
development allocation/s and
through Green Blue Network
mapping and guidance.
This Evidence Report
Resubmission has been updated
to take account of the above
information under  Appendix B,
Liveable Places, Issue 015: Flood
Risk and Water Management
(Including Drainage and Water
Supply Systems). 
SEPA Future Flood Maps Text included in Evidence Report: This is not available for all local
authorities in Scotland at the

Page 30

30
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
Will be updated to reflect the UK 2018 Climate Change Projections.
Reporter’s Comments:
If now available, should be referred in the revised report.
moment,with exception of
coastal maps for Outer Hebrides
and a delivery timeline for its
preparation is unavailable.  For
further information it is noted
that SEPA have produced an
Explanatory note on the
difference between our planning
guidance and the Future Flood
Maps. However we have since
our original Evidence Report
submission published our online
SFRA (Perth and Kinross Strategic
Flood Risk Assessment Map) and
are committed to using the most
up to date flood risk mapping at
time of assessment of potential
allocations for the Proposed Plan.
The most recent SEPA Future
Flood Maps v3.0 2025 includes
surface water and small
watercourses flood maps which
takes account of UK2018 Climate
Change projections, but the River
and the Coastal maps are
generally still based on UK2009
Climate Change data.  
This Evidence Report
Resubmission has been updated
to take account of the above
information under Chapter 5 and
Appendix B, Liveable Places, Issue
015: Flood Risk and Water

Page 31

31
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
Management (Including Drainage
and Water Supply Systems).
Annex B6 – Issue 017.
Homes, and Annex
C16-19
An updated needs
assessment on the
accommodation needs of
Gypsy/Travellers and
Travelling Show People
Text included in Evidence Report:
Will need to be carried out.
Reporter’s Comments:
A clearer commitment and timescale could usefully be provided in the
revised report.
The Council has appointed a
consultant, to undertake the
assessment.  Delivery of the
assessment is expected March
2026.
Evidence Report Resubmission
has been amended accordingly at
Chapter 5, Issue 017: Homes and
Appendix C: Homes, Issue 017:
Homes
Indicative Local Housing
Land Requirement (IHLR)
Reporter’s Comments and Recommendations:
I am content that a sound and evidenced explanation has been given for the
selection of the indicative local housing land requirement (ILHLR)…
As regards the increased allowance proposed to be made for custom/self-
build capacity, it does appear that the council has arrived at a more
sophisticated quantification of this segment of demand.  Going forward, it
may be advisable for the council to give further thought, and provide further
clarification, as to whether the increased allowance for households
achieving their needs through custom/ self-build may feed through into
marginally
lower demand in other segments of supply. 
I note that a proportion of the affordable housing supply is anticipated to
comprise buybacks. I agree it may be reasonable to include at least some of
these as additions to the affordable stock, but the council could also give
some thought and consideration to the extent to which this measure would
produce a loss of supply in the market sector. Buybacks would not appear to
produce any increase in the overall housing supply, and this should be
acknowledged when considering the required land supply for the 
Comments in relation to custom /
self-build and buybacks will be
taken into account in the
considering the required land
supply for the proposed plan as
suggested.
Evidence gaps in relation to
brownfield / urban capacity, and
gypsy / travellers and travelling
showpeople are addressed under
the relevant issue headings.

Page 32

32
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
roposed plan.
I also note that the Report identifies some gaps in evidence in relation to
housing and commits the council to addressing these ahead of the proposed
plan. These include information around brownfield/ urban capacity, and a
more up-to-date understanding of housing need in the gypsy/ traveller/
travelling showpeople communities. I advise this work is expedited either to
include in the revised evidence report or to otherwise ensure that it can
properly inform the preparation of the plan.
Annex C20 – Issue
021. Health Care
Facilities
Developer Contributions
and Health Care
Reporter’s Comments and Recommendation:
The Primary Care Premises Strategy 2023-2028 (CD:D21-14) appears to be
useful but to assume that new housebuilding will translate directly into
increased population. While housebuilding may certainly affect population
distribution this assumption could benefit from further scrutiny.  There is
also some apparent uncertainty as to whether existing GP surgeries are at or
nearing capacity (pg 17 of Issue 21 refers to ‘RAG’ capacity data not being
available and that all practices are routinely accepting new patients).  The
council will need to carefully consider if sufficient information is currently
available should the emerging LDP seek to justify the extension of developer
contributions to healthcare.
The Council notes the Reporter’s
comments regarding making an
assumed correlation between
new housebuilding and an
increase in population and will
give further consideration in the
development of the Proposed
Plan.
The Perth and Kinross Health and
Social Care Partnership’s GP
surgeries RAG capacity data is a
work in progress (as at 1
December 2025) and still contains
practice sensitive data so it can’t
be included as evidence at this
point in time. Our most up-to-
date evidence in this respect
remains the Primary Care
Premises Strategy (Core Doc Ref:
D021_CD015). We remain in
dialogue with colleagues in the
Health and Social Care
Partnership with a view to
improving our knowledge of

Page 33

33
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
capacities at GP surgeries and it is
expected that data will become
available in due course in a form
that can be published. We will
use this data to carefully consider
whether there is sufficient
evidence and justification to
support an extension of
developer contributions for
primary health care.We will
continue to meet regularly with
colleagues within NHS Tayside
throughout the development of
the Proposed Plan to ensure our
knowledge and understanding of
status of health care facilities and
services within the area remains
up to date. 
Annex B6 – Issue 022.
Transportation
Public transport route and
passenger data
Text included in Evidence Report:
Being collated by the Public Transport Team at the time of writing [the
evidence report].
Reporter’s Comments:
If now available, could usefully be provided in the revised report.
The Public Transport Team is still
developing a platform for the
collection of passenger data for
subsidised bus services. Outputs
are not yet available, so the
identified gap remains.We are
not expecting to have access to
passenger data for non-
subsidised services.
Annex B6 – Issue 025.
Business and Industry
Economic Action Plan Text included in Evidence Report:
Will be available end of 2024.
Reporter’s Comments:
Perth and Kinross Economic
Strategy and Action Plan (2025-
2030) has been approved, and
replaces previous 2021 approved
Action plan  Perth and Kinross
Economic Wellbeing Plan 2020-

Page 34

34
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
This would appear to be a significant potential input into the spatial strategy
of the forthcoming plan.  Would appear to be available in time to include in
revised report. 
2028 in the revised Evidence
Report. 
This Evidence Report
Resubmission has been updated
to take account of the above
information under Chapter 5, and
Issue 025, and Appendix E,
Productive Places, Issue 025:
Business and Industry.
Annex C21-22 – Issue
026. Retail, City, Town
and Commercial
Centres AND 29.
Culture and Creativity
Reporter’s Comments and Recommendation:
The evidence report does a reasonable job of summarising the various
reports and strategies pertinent to these subjects but is less successful in
drawing on these to provide a straightforward narrative describing the retail
and cultural characteristics of the area.  There is no real overview of the
retail pattern across the council area and the role of different centres
beyond Figure 1 illustrating tiers of settlement.  I acknowledge that much of
this information is contained in the TC Retail Study, but this could have
usefully been set out in the report itself.  There is little information on the
existence and role of commercial centres beyond the city and town centres.
The LDP Guidance suggests authorities should use TC audits to inform TC
strategies for each centre.  The intention is clearly that the spatial aspects of
these may in turn inform LDPs.  The report does not use this terminology,
and while aspects of the TC Retail Study and the Locality Profiling work may
cover this ground, the council should consider the preparation of such
audits/strategies or otherwise satisfy itself that equivalent evidence is in
place before proceeding to prepare to the proposed plan.
Note that the Evidence Report
did rely too heavily on the Retail
Study providing additional
information on role and health of
our retail centres. This
information along with other
evidence, will be brought forward
in our Locality Profiles to inform
the Proposed Plan. The Locality
profiles are estimated for
completion by end of 2025 and
will provide a more
comprehensive consideration of
all our centres (including
neighbourhood and commercial
centres. In the meantime, the
Evidence Report has been
updated to provide more
narrative on Perth city and the
town centres.  This Evidence
Report Resubmission has been
updated to take account of the
above information within Chapter
5 and Appendix E, Productive

Page 35

35
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
Places, Issue 026: Retail, City,
Town and Commercial Centre.
Annex C23 – Issue
027. Rural
Development
Potential for resettlement
of previously inhabited
areas
Reporter’s Comments and Recommendation:
The evidence report may be being overly pessimistic about the potential for
resettlement of previously inhabited areas, especially given that significant
historic population declines are noted in some areas.  The Rural Homes
section of NPF4 states that suitable areas should be identified in the spatial
strategy.  The mixed success of the previous ‘development zone’ approach is
noted, but there may be other approaches.  The fact that some previously
settled areas are remote may not rule out the application of this concept.
Note the recommendation that a
less pessimistic approach is taken
to the potential for resettlement
of previous inhabited areas.
Evidence Report Resubmission
has been amended accordingly at
Chapter 5, Issue 027: Rural
Development and Appendix E:
Productive Places, Issue 027:
Rural Development
Annex B6 – Issue 028.
Tourism
Tay Cities Region Tourism
Strategy 2019-2024 and
Perthshire Tourism Action
Plan 2021-2025
Text included in Evidence Report:
A new economic plan for Perth and Kinross is currently being developed.
Reporter’s Comments:
These reports appear to have now expired.  Some clearer explanation as to
whether they are to be replaced individually, or whether the new economic
plan will perform this role, and in what timescale, should be provided.
The Tay Cities Region Tourism
Strategy 2019-2024, the Perth
and Kinross Economic Wellbeing
Plan 2020-2028, and the
Perthshire Tourism Action Plan
2021-2025 have all been replaced
by more up-to-date documents.
Evidence Report Resubmission
has been amended accordingly at
Chapter 5, Issue 028: Tourism and
Appendix E: Productive Places,
Issue 028: Tourism
Annex C24 – Issue
030. Minerals
Spatial distribution of
workable mineral
resources, and 10-year
landbank of construction
aggregates 
Reporter’s Comments and Recommendation:
Information on this topic was rather sparse.  In particular a stronger
narrative and mapping of the spatial distribution of workable mineral
resources would have been helpful.  The report acknowledges some ongoing
uncertainty regarding the existence of a 10-year landbank of construction
aggregates and commits to closing this evidence gap through engagement
with the minerals industry.  It would have been preferable for this to have
Due to resources engagement
with the minerals industry to
ascertain the status of a 10-year
landbank of construction
aggregates has not taken place to
date.  It is our intention to issue a
survey to operators at the end of
2025 to allow us to analyse the

Page 36

36
Reference and Issue Important Information
Gaps
Evidence Report (ER) Indicated Timescale for Resolution and/or Reporter’s
Comments and Recommendation(s)
PKC Update or Actions Taken
taken place ahead of the evidence report so that the policy implications of
this matter could have been straightforwardly set out.
scale and distribution of workable
resources, the outputs of which
will be used to inform the
Proposed Plan.   
A map showing the current
spatial distribution of mineral
operations across the Perth and
Kinross Area has been provided
under Appendix E, Issue 030:
Minerals.
Annex B6 - General Locality Profile Exercise Reporter’s Comments and Recommendation:
Would seem to be an important part of the evidence base for the
forthcoming plan, with the potential to inform thinking on issues including
20-minute neighbourhoods, placemaking and local infrastructure capacity. 
If outputs still not available to describe in the revised report, a clear
commitment and timescale could usefully be provided.
The Locality Profile exercise for
the LDP3 is currently underway
and outputs are expected to be
available late December 2025,
early January 2026.

Page 37

37
Table 2: Legislative Requirements for Local Development Plan Evidence Reports
Required Under Detailed Requirements for the Evidence Report Relevant Chapter of Report
The Town and Country
Planning (Scotland) Act
1997, as amended by the
Planning (Scotland) Act 2019
[the Act] - Part 2, Section
16B(2)
In preparing the evidence report, the planning authority are to seek the views of
and have regard to any views expressed by the key agencies, children and young
people (in particular school pupils, youth councillors and young parliament
representatives), such persons as may be prescribed, and the public at large.
Chapter 3, Participation and
Engagement, pages 59-72
The Act – Part 2, Section
16B(3) and Section 15(5)(a)
The planning authority’s views on the principal physical, cultural, economic,
social, built heritage and environmental characteristics of the land in the district.
Chapter 2, Profile of the Perth and
Kinross Area, pages 17-43
The Act – Part 2, Section
16B(3) and Section 15(5)(b)
The planning authority’s views on the principal purposes for which the land is
used.
Chapter 2, Profile of the Perth and
Kinross Area, pages 41-43
The Act – Part 2, Section
16B(3) and Section 15(5)(c)
The planning authority’s views on the size, composition, health, and distribution
of the population of the district.
Chapter 2, Profile of the Perth and
Kinross Area, pages 44-50
The Act – Part 2, Section
16B(3) and Section 15(5)(ca)
The planning authority’s views on the housing needs of the population of the area
(including, in particular, the needs of persons undertaking further and higher
education, older people and disabled people).
Chapter 5, Evidence Gathering -
Information on Issues
Issue 017: Homes, pages 202-207
The Act – Part 2, Section
16B(3) and Section 15(5)(cb)
The planning authority’s views on the availability of land in the district for
housing, including for older people and disabled people.
Chapter 5, Evidence Gathering -
Information on Issues
Issue 017: Homes, pages 202-207
The Act – Part 2, Section
16B(3) and Section 15(5)(cc)
The planning authority’s views on the desirability of allocating land for the
purposes of resettlement.
Chapter 5, Evidence Gathering -
Information on Issues
Issue 017: Homes, page 243
The Act – Part 2, Section
16B(3) and Section 15(5)(cd)
The planning authority’s views on the health needs of the population of the
district and the likely effects of development and use of land on those health
needs.
Chapter 2, Profile of the Perth and
Kinross Area, page 55

Page 38

38
3 References to systems for the supply of energy include in particular land available for the development and use of facilities for renewable sources of energy. (Section 15 subsection (5A) 
Required Under Detailed Requirements for the Evidence Report Relevant Chapter of Report
The Act – Part 2, Section
16B(3) and Section 15(5)(ce)
The planning authority’s views on the education needs of the population of the
district and the likely effects of development and use of land on those education
needs.
Chapter 2, Profile of the Perth and
Kinross Area, pages 56-58
The Act – Part 2, Section
16B(3) and Section 15(5)(cf)
The planning authority’s views on the extent to which there are rural areas within
the district which have experienced a substantial decline in population.
Chapter 2, Profile of the Perth and
Kinross Area, pages 51-54
The Act – Part 2, Section
16B(3) and Section 15(5)(cg)
The planning authority’s views on the capacity of education services in the
district.
Chapter 5, Evidence Gathering –
Information on Issues
Issue 020: Infrastructure - Education
Facilities, page 241-246
The Act – Part 2, Section
16B(3) and Section 15(5)(ch)
The planning authority’s views on the desirability of maintaining an appropriate
number and range of cultural venues and facilities (including in particular, but not
limited to, live music venues) in the district.
Chapter 5, Evidence Gathering –
Information on Issues
Issue 029: Culture and Creativity,
pages 247-250
The Act – Part 2, Section
16B(3) and Section 15(5)(d)
The planning authority’s views on the infrastructure of the district (including
communications, transport and drainage systems, systems for the supply of water
and energy2F
3, and health care and education facilities).
Chapter 5, Evidence Gathering –
Information on Issues
Issue 022: Infrastructure and
Transportation pages 209, 211-212,
213-215, 216-218, 219-224, 225-226
The Act – Part 2, Section
16B(3) and Section 15(5)(e)
The planning authority’s views on how that infrastructure is used. Chapter 5, Evidence Gathering –
Information on Issues
Issue 022: Infrastructure and
Transportation pages 209, 211-212,
213-215, 216-218, 219-224, 225-226
The Act – Part 2, Section
16B(3)(b)(i) and (ii)
A summary of the action taken by the planning authority to support and promote
the construction and adaptation of housing to meet the housing needs of older
people and disabled people in the authority’s area, and an analysis of the extent
to which the action has helped to meet those needs.
Chapter 5, Evidence Gathering -
Information on Issues
Issue 017: Homes, pages 205-206

Page 39

39
4 “Accommodation needs” includes, but is not limited to, needs with respect to the provision of sites on which mobile homes may be stationed. 
Required Under Detailed Requirements for the Evidence Report Relevant Chapter of Report
The Act – Part 2, Section
16B(3)(c)(i) and (ii)
A summary of the action taken by the planning authority to meet the
accommodation needs 3F
4of Gypsies/Travellers in the authority’s area, and an
analysis of the extent to which the action has helped meet those needs. 
Chapter 5, Evidence Gathering -
Information on Issues
Issue 017: Homes, pages 206-207
The Act – Part 2, Section
16B(3)(d)(i)
Set out how the planning authority have invited local communities in their district
to prepare Local Place Plans in accordance with Schedule 19.
Chapter 8, Local Place Plans, page 282
The Act – Part 2, Section
16B(3)(d)(ii)
Set out the assistance provided to local communities to assist them to prepare
Local Place Plans.
Chapter 8, Local Place Plans, pages
282-283
The Act – Part 2, Section
16B(3)(e)
Include any such matters as prescribed. 
The Act – Part 2, Section
16D(1)
Include an assessment of the sufficiency of play opportunities in its area for
children in preparing an Evidence Report. 
Chapter 5, Evidence Gathering -
Information on Issues
Issue 014: Play, Recreation and Sport,
page 193
The Act – Part 2, Section
16B(4)(a)(i) to (iii) and
16B(4)(c)
Include a statement on how the planning authority, in preparing the report,
sought the views of the public at large, including, in particular, the views of
disabled persons, Gypsies/Travellers, and children and young people, and the
extent to which the views expressed have been taken into account in the report.
Chapter 3, Participation and
Engagement, pages 59-61, 70-71, 71,
69-70
The Act – Part 2, Section
16B(4)(b) and 16B(4)(c)
Include a statement on the steps taken by the planning authority in preparing the
report to seek the views of community councils, and the extent to which the
views expressed have been considered in the report.
Chapter 3, Participation and
Engagement, pages 71-72
The Act – Part 2, Section
16B(5)
Before submitting a Proposed Evidence Report, the planning authority must
approve it. 
Chapter 9, Approval of Proposed
Evidence Report, page 284
LDP Guidance – Evidence
Gathering, Paragraphs 89-91
The Regulations do not include minimum evidence requirements.
The Evidence Report should consider the local, regional and national strategies
and policy priorities that could impact on the direction and subsequent
Chapter 5, Evidence Gathering –
Information on Issues, pages 97-250,
Appendices A-E

Page 40

40
Required Under Detailed Requirements for the Evidence Report Relevant Chapter of Report
implementation of the LDP, and which will shape the requirements of the
evidence base.
In gathering the evidence for their plan, planning authorities should be thinking
ahead to the ‘Information and Considerations’ and content requirements that
must be included in the Proposed Plan.  Where required, reasonable steps should
be taken to address any gaps in evidence gathered. 
LDP Guidance – Evidence
Gathering, Paragraphs 92
The Evidence Report can support an Infrastructure First approach by including an
assessment of the capacity of existing infrastructure and services. 
Chapter 5, Evidence Gathering –
Information on Issues
Issues 018-23: Infrastructure and
Transportation, pages 209-226,
Appendix D
LDP Guidance – Evidence
Gathering, Paragraphs 93
As part of the preparation of the Evidence Report, the planning authority should
evaluate whether the previous plan has delivered on its outcomes, and
allocations, identify any lessons learnt for the preparation of the new plan and
consider the appropriateness of the previous spatial strategy.  N.B. new proposals
or site-specific detail should not be included at this stage.
Chapter 4, Perth and Kinross LDP2
Monitoring, pages 73-96
LDP Guidance – Drafting the
Evidence Report, Paragraph
108
The Evidence Report should not include detailed policies and site proposals. 
Detailed site appraisal will not be appropriate at the Evidence Report stage, but
the planning authority could develop a site appraisal methodology for appraising
sites and informing allocations for the Proposed Plan which could be linked or
integrated with the approach to SEA assessment.
Chapter 7, Links to Strategic
Environmental Assessment (SEA),
pages 280-281
LDP Guidance – Drafting the
Evidence Report, Paragraph
109
The Evidence Report may be collated around issues – either policy topics or
places.  A suggested template is provided in the LDP Guidance at Figure 7, page
33.  
Chapter 5, Evidence Gathering –
Information on Issues, pages 97-98
LDP Guidance – Drafting the
Evidence Report, Paragraph
111
To help the Gate Check process, planning authorities should identify where there
are any potential gaps in the evidence gathered or uncertainty in data and
evidence within the Evidence Report, along with an explanation of the authority’s
reason for accepting this evidence and including it in the Report.  This should be
Chapter 5, Evidence Gathering –
Information on Issues, pages 97-250,
Appendices A-E, Summary Table
pages 99-111

Page 41

41
Required Under Detailed Requirements for the Evidence Report Relevant Chapter of Report
set out clearly under the ‘Summary of Evidence’ heading in the template at Figure
7, page 33. 
LDP Guidance – Drafting the
Evidence Report, Paragraph
113
The Evidence Report should highlight areas where the planning authority is
aware, through discussions etc. that stakeholders agree or disagree with the
evidence, and the reasons for this.  
Chapter 5, Evidence Gathering –
Information on Issues, pages 97-250,
Appendices A-E, Position Statement
and Table of Disputes pages 113-135
LDP Guidance – Drafting the
Evidence Report, Paragraph
114
The Evidence Report should bring together the ‘Summary of Implications for the
Proposed Plan’ and ‘Statements of Agreement/ Dispute’ for all the topics to help
allow for connections to be made across issues, and flag key issues. 
Chapter 5, Position Statement and
Table of Disputes pages 113-135
Chapter 6, Summary of Key Issues for
LDP3 Spatial Strategy, pages 251-279
Appendices A-E
LDP Guidance – SEA,
Paragraphs
Preparation of the Evidence Report should be aligned with the scoping of SEA. 
The Evidence Report must set out the planning authority’s views on
‘environmental characteristics’ of the plan area, as per Section 15(5) of the Act. 
The material that informs the SEA Scoping Report and the Evidence Report are
likely to be similar. 
Chapter 7, Links to Strategic
Environmental Assessment (SEA),
pages 280-281, and Appendix H

Page 42

42
2  Profile of the Perth and Kinross Area 
PRINCIPAL CHARACTERISTICS OF THE AREA
2.1 The paragraphs to follow provide an overview of the principal
physical, cultural, economic, social, built heritage and
environmental characteristics of the Perth and Kinross Area, as
required under Section 16B(3) and Section 15(5)(a) of the
Planning Act.  More detailed information and evidence relating to
these characteristics is summarised under the range of issues
covered by this Evidence Report and within our LDP3 background
Topic Paper 001: The Plan Area and our Strategic Environmental
Assessment (SEA) Scoping Report (Core Doc Ref: CD005)
Physical Characteristics
2.2.1 The Perth and Kinross Council Area is situated in the heart of
Scotland, just north of the Central Belt bordering Aberdeenshire,
Angus, City of Dundee, Fife, Clackmannanshire, Stirling, Argyll and
Bute, and Highland Council areas.  The Cairngorms National Park
is located to the north, and the Loch Lomond and the Trossachs
National Park to the west. 2.2.2 The Area covers 5,286km2
(4,707km2 excluding the part of Perth and Kinross within the
Cairngorms National Park) and is the 5th largest unitary authority
in terms of area in Scotland, and the 12th largest in respect of
population size.  It is an area of outstanding natural beauty,
containing both highland and lowland landscapes.  
2.2.3  Figure 1 to follow shows the overall Perth and Council Area, within
the context of Scotland, and the part of PKC within the National
Park Area (see green boundary line in top left inset map).
Figure 1:  The Perth and Kinross Council Area
2.2.4 The Highland Boundary Fault (Figure 2) runs across the area from
the northeast to the southwest, roughly dividing the landscape of
Perth and Kinross between the distinct geological areas of Highland
Perthshire, and Lowland Perthshire and Kinross.   The division is
very much reflected in the topography, vegetation, and land use of
those areas.   Both are characterised by a diverse mix of rural and
urban land use, which varies considerably from rich lowland arable
farming to extensive upland forestry, and from the main population
centre of Perth, and towns such as Blairgowrie, Crieff, Kinross,

Page 43

43
Auchterarder and Pitlochry, to small, extremely remote
communities, such as Kinloch Rannoch in the Highland Area.
Figure 2: The Highland Boundary Fault Line with Perth and Kinross
2.2.5 There are 10 main Landscape Character Types present within the
Perth and Kinross Council Area, as categorised by the map-based
national Landscape Character Assessment (Core Doc Ref: CD006).  
These are:
 Summits and Plateaux – Tayside (22.5%)
 Summits and Plateaux – Cairngorms (10.7%)
 Traditional Moorland and Forest (8.9%)
 Lowland Hills – Tayside (8.8%)
 Lowland Hill Ranges (8.6%)
 Mid Upland Glens (7.1%)
 Lower Upland Glens (6.3%)
 Mid Upland Glens with Lochs (4.7%)
 Lowland Basins (3.3%)
 Upland Glen – Cairngorms (3.0%)
2.2.6 Figure 3 to follow shows the distribution of all landscape character
types (not just the main ones listed above) across the Council Area.

Page 44

44
Figure 3: Landscape Character Types within Perth and Kinross

Page 45

45
2.2.7 Historic Environment Scotland’s Historic Land Use Assessment
(HLA) shows the extent of changes that have occurred to the
environment.  It plots those land uses which are still in existence
at a scale of 1:25,000, describing them by function and period.  It
maps both current, and where surviving, previous land uses.  An
HLA has been undertaken for a large percentage of the Council
Area.  Figures 4 and 5 to follow show the HLA coverage available
for Perth and Kinross and main classification categories, and Table
2 below, a breakdown of key historic land uses across the area.
Table 2: Key Historic Land Use within Perth and Kinross
Historic Land Use Category Area (Km2)
Woodland and Forestry 806.6
Agriculture and Settlement 760.9
Moorland and Rough Land Grazing 503.7
Waterbody 87.0
Designed Landscapes 59.4
Built Up Area 45.5
Leisure and Recreation 33.9
Defence 19.1
Energy Extraction and waste 12.8
Rural Settlement 4.3
Transport 3.2
Spiritual and Ritual 0.4
2.2.8 A clear distinction can be seen in Figure 4 between the moorland
and rough grazing, and woodland and forestry in the upland area,
and agriculture in the lowland areas.

Page 46

46
Figure 4: HLA for the Perth and Kinross Area (Land Uses/ Function)

Page 47

47
Figure 5: HLA for the Perth and Kinross Area (Time Periods)

Page 48

48
2.2.9 The National Land Capability for Agriculture in Scotland Map (Core
Doc Ref: CD007), which was produced by the Macaulay Institute for
Soil Research during the 1980’s, provides a land classification
system, ranking land on the basis of its potential productivity and
cropping flexibility.    
2.2.10 Land Classes 1 to 3.1 are typically referred to as ‘Prime Agricultural
Land’ and are capable of being used to produce a wide range of
crops.  Classes 3.2 to 4.2 are regarded as land capable of supporting
mixed agriculture, which can be used to grow a moderate range of
crops, including potatoes and cereals, forage crops and grass. 
Historically the Development Plan has sought to protect the loss,
through development, of land within Classes 1, 2, and 3.1.  There is
no Class 1 land within the Perth and Kinross Council Area.  Table 3
and Figure 6 show the scale and distribution of Classes 2, and 3.1
across the area, and Class 3.2 has also been included due to its
potential to produce some crops.  More detailed maps can be
viewed under the Soils issue of this Evidence Report. 
Table 3: Breakdown of Prime Agricultural Land within PKC
Map Key Class Area (Ha) % of Perth
and Kinross
Class 2: Land capable of
producing a wide range of
crops.
25,946.4  4.9% 
Class 3.1: Land capable of
producing consistently high
yields of a narrow range of
crops and/or moderate yields
of a wider range.  Short grass
leys are common.
36,485.7  6.9% 
Class 3.2:  Land capable of
average production though
high yields of barley, oats and
grass can be obtained.  Grass
leys are common.
57,877.54  11%

Page 49

49
Figure 6: Overview of Prime Agricultural Land within PKC

Page 50

50
2.2.11 The National scale Land Capability for Forestry Map provides(Core
Doc Ref: CD008) information on the potential for land across
Scotland to grow trees based on a number of factors, including soil,
climate, and topography.  The map was produced by the Macauley
Land Use Research Institute and also uses a classification system of
Classes F1 through to F7 in terms of capability.  Classes F8 and F9,
represent, respectively, built-up areas and areas of inland water.
2.2.12 Figure 7 and Table 4 to follow show the location of those classes
within Perth and Kinross and provide a breakdown of that
coverage.  The total amount of the Perth and Kinross Area which is
covered by Classes F1 – F4, i.e. land which is excellent through to
that with moderate flexibility for the growth and management of
tree crops, is 2,044 Km2, which equates to 38.66% of the total
Council Area.  A more in depth look at across the area has been
carried out for the Forestry, Woodland and Trees issue of this
Evidence Report. 
Table 4: Breakdown of Land Capability for Forestry within PKC
Map
Key Class Area
(Km2)
% of
Perth and
Kinross
F1 – Land with excellent
flexibility for the growth and
management of tree crops
23.27 0.44%
F2 – Land with very good
flexibility for the growth and
management of tree crops
247.04 4.67%
F3 – Land with good flexibility
for the growth and
management of tree crops
342.28 6.48%
F4 – Land with moderate
flexibility for the growth and
management of tree crops
374.68 7.09%
F5 – Land with limited flexibility
for the growth and
management of tree crops
451.34 8.54%
F6 – Land with very limited
flexibility for the growth and
management of tree crops
338.14 6.40%
F7 – Land unsuitable for
producing tree crops 266.94 5.05%

Page 51

51
Figure 7: Overview of Land Capability for Forestry in PKC

Page 52

52
Cultural Characteristics
2.3.1 Culture is at the heart of every community in Perth and Kinross. 
Historically and culturally Perth and Kinross has played an
important role at the heart of Scotland.  It is home to some of
most beautiful countryside in the world linked by the Rivers Tay,
Earn, Almond, Garry, and Isla.  Ancient drove roads and the Wade
Roads built following the Jacobite Risings of the early 18th Century
criss-cross the land, which is also rich in designated and
undesignated heritage assets.  The area around Forteviot, to the
east of Perth, was known as the ‘Cradle of Scotland’, and is the
place where Picts, Gaels and Scots came together to create the
Kingdom of Alba in the time after the Romans left. 
2.3.2 Perth and Kinross Council has been a local authority since local
government reorganisation in 1996.  Perth regained its City Status
in 2012 and became Scotland’s 7th city.  Perth College is part of
the University of the Highlands and Islands (UHI) and boasts 650
culture and creative industry students.   
2.3.3 The area has a mix of nationally recognised creative organisations
who produce innovative and exciting new work for and about the
people of Perth and Kinross, and bring global artists and creative
work to the area.  This nationally and internationally important
work connects with homegrown talent in the form of artists,
makers, writers, musicians, poets, and actors who live and work
here.  
2.3.4 Local museum collections represent past generations who lived on
and worked the land, and events at local pubs and community
halls keep alive traditional music, stories, and song.  
2.3.5 There are several festivals held to celebrate some of the Area’s
greatest cultural figures, including the Neil Gow Festival (Birnam),
the Soutar Scots Language and Literature Festival, Perth Festival
of the Arts, and Blairgowrie’s Bookmark Festival.
2.3.6 The Area’s communities have always been rich and diverse, and
this has been further strengthened in recent years with people
from all over the world making Perth and Kinross their home,
bringing with them a range of cultural traditions and creativity. 
Our Gypsy Traveller communities have roots here, dating back
centuries.  
2.3.7 There are two major producing theatres in the area, several
museums of UK and national significance, including the new Perth
Museum which houses the Stone of Destiny, and the Scottish
Crannog Centre, and Black Watch Museum.  The Area’s cultural
venues are mostly run by charities and community-led
organisations, many of which are revenue or grant-funded by the
Council. 
2.3.8 The Council works closely with neighbouring local authorities,
including through the Tay Cities Deal – a £150 million agreement
between the UK and Scottish Governments to make the region

Page 53

53
smarter and fairer through investment in innovation, international
links, and cultural tourism.
2.3.9 The Council’s Culture Strategy 2023-2028 reports on the Council
Area across seven distinct localities each with their own cultural
qualities and significance.   Figure 8 on the following page shows
the spatial distribution of these localities, and the text to follow,
the key cultural characteristics.

Page 54

54
Figure 8: Localities within Perth and Kinross

Page 55

55
2.3.10 These localities are:
1. Perth City, which is the main urban centre in Perth and Kinross. 
It is compact, walkable and contains several beautiful parks,
and the River Tay running through it.  It has an important
heritage as Scotland’s first capital, and a growing contemporary
art scene.  Some of its assets include the Concert Hall, Perth
Theatre, Perth Art Gallery, Perth Museum, and the AK Bell
Library, which is Scotland’s 4th busiest library.   Other important
assets are - a range of light and art installations across the City,
including in historic medieval vennels; the Creative WASPS Hub
(home to makers and creatives), and the University of the
Highlands and Islands/ Perth College, which has a curriculum
specialising in music technology and other creative subjects.  
In addition, there is also a range of independent charities who
operate the theatre, concert hall, museums and libraries and
who offer programmes across all art forms and creative
learning opportunities for all ages.  Perth City also has
independent organisations, such as Ad-lib Arts and Julie Young
Dance School, who provide training for local children and
young people in performing arts. 
2. Eastern Perthshire is a rural area with the 3 towns of
Blairgowrie (which has the largest population after Perth),
Coupar Angus, and Alyth.  It covers Strathmore, the Carse of
Gowrie, and Blairgowrie and the Glens.  The area is regarded as
a place of traditional storytelling, poetry, and song, walks and
outdoor living.  Blairgowrie was the birthplace of Hamish
Henderson, a Scottish poet, songwriter, soldier, and known as
the founding father of Scotland’s 20th Century Folk
Renaissance.  It is also an area that is rich in farming, which
provides an inspiration and resource for the social history
museum collection in Alyth.  The Nest in Blairgowrie is a hub of
creativity activity, focussed on the surrounding community,
and the town also hosts the annual Bookmark Festival during
October. 
3. Highland Perthshire, which boasts more than 200,000 acres of
woodlands, is known as ‘Big Tree Country’.  The area also
contains spectacular mountains, glens, large lochs, and historic
towns and villages, and is home to musicians, makers, and
creatives.  The two biggest towns are Pitlochry and Aberfeldy.
Highland Perthshire has witnessed some of the most turbulent
and important events in Scottish history with the stunning
views of Schiehallion, the Queen’s View at Loch Tummel, the
hydro-electric dams built in the early 20th Century, and traces
of the 19th Century Highland Clearances are all part of the
area’s landscapes and stories.   Perthshire Gaelic was the
majority language in the Highlands, and in Perth, until the late
medieval period, and native Gaelic speakers continued to live
in the Highlands until very recently.  Some of the area’s cultural
assets include: the Pitlochry Festival Theatres; the Birk’s
Cinema, which is a community owned facility hosting music,
spoken word, and film festivals, and the Scottish Crannog
Centre at Kenmore, which is expanding its site via a Community
Asset Transfer and Scottish Government grant, to tell the story
of the Iron Age people who lived on the waters of Loch Tay.
4. Strathtay is a rural area in the centre of Perth and Kinross.  It is
home to the two busy towns of Birnam and Dunkeld.  The area
is surrounded by stunning scenery, and the River Tay runs
through the centre of it.  Traditional music is still an important
part of community life in this area.  The Birnam Arts Centre,
which is also a community owned and managed asset, has a
café, shop, gallery, and auditorium, and hosts a range of events
across the year.  The area hosts a few unique home-grown
events and festivals, including the Neil Gow Festival, which

Page 56

56
celebrates the famous fiddler who set many of Robert Burns’
songs and poems to music.
5. In the Almond and Earn area, much of the population primarily
live in villages – there are no major towns.  However, parts of
the area are close to Perth.  Abernethy is the area’s largest
village and has an independently run museum where you can
climb to the top of Abernethy Round Tower.  The tower dates
to 1100 and is one of only two Irish-style round towers in
Scotland.  Culture in the area thrives in local clubs, village halls
and groups which have been created and run by local people,
including the cinema club.  
6. Strathearn and Strathallan are located to the south west of
Perth.  The area’s biggest towns are Crieff and Auchterarder,
and are surrounded by mountains, lochs, and rivers.  The
Gleneagles Hotel, which opened in 1924, Crieff Hydro, and
Drummond Castle, are some of the major attractions which
help the area contribute 23% of tourism revenue to Perth and
Kinross.  Innerpeffray Library, close to Crieff, is the oldest
public lending library in the UK, and it is still possible to study
and view its important special collection there.   There are
several active arts organisations, including Strathearn Arts,
which is a major provider of culture in the area; Radio Earn
radio station; regular concerts across the year, and a range of
local culture and heritage groups and classes.  The area is also
home to a few small creative businesses.  
7. Kinross-shire lies between Fife and Perthshire, and boasts
plenty of beautiful scenery and walks, including Loch Leven,
which is an RSPB National Nature Reserve, where you can spot
rare birds and the castle where Mary Queen of Scots was held
captive.  Kinross is the main town in the area and houses one
third of Kinross-shire’s overall population.  The Area has a
proud music scene, with music being played in local pubs and
hotels, and by young people, the orchestras, and choirs who
meet.
2.3.11 Gaelic Culture and Heritage is also an important aspect of the
cultural characteristics of Perth and Kinross.  The area’s Gaelic
heritage includes a wealth of stories and songs, traditional Gaelic
melodies, and a landscape full of Gaelic place names.  Further
information on the Gaelic heritage of the area, including books
and records, and signposts to ways of accessing Gaelic education
within Perth and Kinross, are covered under the Culture and
Creativity issue of this Evidence Report. 
Economic Characteristics
2.4.1 In the years immediately preceding the COVID-19 pandemic, the
Perth and Kinross economy had experienced growth, with higher-
than-average rates of employment (particularly through self-
employment), very low unemployment, and higher than the
national level increases for VAT business registrations. Tourism
revenue had also grown, with tourism related employment
accounting for 13% of the total workforce of the area.
2.4.2 The paragraphs and tables to follow provide an overview of the
economic performance within Perth and Kinross across several
key economic performance indicators.  These indicators mirror
those reported in the Tay Cities Regional Economic Strategy (2019
– 2039). (Core Doc Ref: CD009)

Page 57

57
2.4.3 Productivity and Earnings – the Gross Value Added (GVA) in Perth
and Kinross Area is better than the Scottish average; the average
workplace weekly wage is lower than the Scottish average, but
the average resident weekly wage for the area is slightly higher.  
Table 5: Overview of Economic Performance within Perth and
Kinross
Indicator Perth and
Kinross Scotland
GVA per head of population (2021) £27,755.02 £27,361.45
GVA per job (2021) £55,441.56 £52,869.53
GVA per hour worked (£) £39.50 £36.90
Growth in total GVA (2017 - 2021) +1.4% +6.9%
Employment rate (16 to 64 years)
(12 months to September 2023) 76.9% 75.2%
Employment rate growth (2018 –
2023, percentage points) -0.1 +0.9
Average (median) workplace weekly
wage (2023) £671.90 £702.80
Average (median) resident weekly
wage (2023) £727.70 £702.40
2.4.4 Business Base – The business base for the area tends to mirror
that of Scotland as a whole, with the exception of the number of
businesses per 10,000 of the working age population - which is
significantly higher than the national average, and the growth in
number of businesses between 2018 and 2023, which has
experienced less of a decline during that period than Scotland as a
whole.  
Table 6: Business Base within Perth and Kinross (2023)
Indicator Perth and
Kinross Scotland
No. of businesses per 10,000 working
age population (2023) 646 481
Growth in no. of businesses (2018 –
2023) -0.7% -1.9%
Business births per 10,000 working age
population (2022) 53.9 53
5-year business survival rate (2017 -
2022) 49.5% 40.5%
% micro-businesses (0-9 employees)
2023 87.7% 87.4%
% SME businesses (10-249 employees)
2023
12.1% 12.2%
% large businesses (+249 employees)
2023
0.2% 0.3%
2.4.5 Employment and Growth Sectors – Table 7 to follow shows that
the largest share of jobs across the area are in the Tourism, Health
and Social Work, Retail, and Food and Drink sectors, this is to an
extent similar to the national picture, which sees the majority of
jobs located within the Health and Social Work, Financial and
Business Services, Education, Retail, and Tourism sectors.

Page 58

58
Table 7: Top Employment Sectors and Scottish Government
Growth Sectors within Perth and Kinross (2022)
Indicator Perth and
Kinross Scotland
Health and Social Work 8,000 394,000
Retail (excluding Motor Trades) 7,000 227,000
Financial and Business Services 6,000 322,000
Tourism 9,000 216,000
Education 5,000 220,000
Manufacturing 4,500 173,000
Public Admin. and Defence 4,000 163,000
Construction 4,500 148,000
Food and Drink 7,000 125,000
Creative Industries (including Digital) 1,325 88,000
Energy (Including Renewables) 4,000 68,000
Life Sciences 400 23,000
2.4.6 In terms of the Scottish Government’s identified ‘Growth Sectors’
i.e. those sectors where Scotland is considered to have a distinct
comparative advantage, Table 8 to follow highlights that the Perth
and Kinross Area is performing well above the Scottish average in
respect of its percentage share of jobs within the Food and Drink,
Energy (including Renewables), and Sustainable Tourism sectors.  
However, it is below the Scottish average for percentage share of
jobs in the Financial and Business Services, Creative Industries,
and Life Sciences.  It is perhaps worth noting that the Tay Cities
Region Economic Strategy identifies the Key Business Sectors for
the Region as being - Tourism and Culture; Food and Drink;
Engineering and Manufacturing; Energy; Digital and Creative
Industries; Biomedical, Life Sciences and MedTech, and
Construction.  
Table 8: Scottish Government Growth Sectors – Percentage Share
of All Jobs within Perth and Kinross
Indicator Perth and
Kinross
Scotland
Food and Drink 10.1% 4.8%
Financial and Business Services 5.8% 9%
Life Sciences 0.6% 0.9%
Energy (Including Renewables) 5.8% 2.6%
Sustainable Tourism 13% 8.7%
Creative Industries (including Digital) 1.9% 3.4%
2.4.7 In respect of ‘Inclusive Growth’, the most recent data available
(see Table 9) relating to employment shows that, whilst the
employment statistics across the three occupation levels (higher,
mid, and lower) look similar to the national picture for two out of
three of the levels, Perth and Kinross was performing at a lower
rate in terms of employment in the lower-level occupations during
the 12 month period to December 2022.  
2.4.8 The relationship between broadband investment and economic
growth is widely regarded as a significant one.  Digital connectivity
policy in Scotland contributes to several key cross-cutting Scottish
Government policy statements and ambitions.  The most recent
data (see Table 9) relating to percentage of premises with access
to superfast, ultrafast, and full fibre broadband within Perth and
Kinross, highlights that the area is lagging the national average.

Page 59

59
The percentage area coverage with mobile data service is on a par
with the national average.
Table 9: Inclusive Growth within Perth and Kinross
Indicator Perth and
Kinross
Scotland
Employment in higher level
occupations (12 months to Dec 2022)
35,500
(48.4%)
1,299,200
(48.3%)
Employment in mid-level occupations
(12 months to Dec 2022)
21,200
(28.9%)
700,400
(26%)
Employment in lower-level occupations
(12 months to Dec 2022)
13,200
(18%)
632,200
(23.5%)
% employee jobs paid below Living
Wage (2023, provisional data) 10.4% 10.1%
Participation rate for 16-19 year olds
(2023) 94.7% 94.3%
% premises able to access superfast
broadband (>=30Mbit/s) (2023) 87% 95%
% premises able to access ultrafast
broadband (>=100Mbit/s) (2023) 42% 71%
% premises able to access full fibre
broadband (2023) 14% 52%
% area coverage with mobile data
service (2023) 90% 94%
2.4.9 Unemployment – The figures in Table 10 show that the
unemployment rate for the area is estimated to be below the
Scottish average.  However, it is important to note that the Office
of National Statistics Annual Population Survey data collection
5 Estimate unreliable.
process has been severely affected since the Covid-19 pandemic.
For this reason, many of the measures have been either unreliable
as estimates, or unavailable entirely due to sample size and
sample availability. This is pronounced at the local authority level.
Table 10: Labour Market within Perth and Kinross (12 months to
September 2023)
Indicator Perth and
Kinross
Scotland
Unemployment rate 16+ (modelled) 2.8% 3.4%
Unemployment rate (16 to 64 years)  2.5%1F4F
5 3.4%
Male unemployment  N/A 3.9%
Female unemployment N/A 2.9%
% working age population with no
qualifications N/A N/A
2.4.10 Claimant Count – The total number of claimants in Perth and
Kinross during March 2024 was a significantly small proportion
(1.9%) of the overall number across Scotland at this time.  The
highest number of claimants was in the 25-49 age group, and the
lowest in the age 16-24 group.  The national claimant rate for age
16+ was 3.1%, compared to a 2.3% rate for Perth and Kinross. 
Finally, there was a higher percentage rate of males claiming
compared to females in the 16+ age group during the same
month.

Page 60

60
Table 11: Claimant Count and Rate by Sex and Age Group (March
2024)
Indicator Perth and
Kinross Scotland
Claimant Count, age 16+ 2,140 109,890
Claimant Count, aged 16-24 355 19,910
Claimant Count, aged 25-49 1,320 63,680
Claimant Count, aged 50+ 465 24,300
Claimant Count, age 16+, male 1,290 65,640
Claimant Count, age 16+, female 850 44,250
Claimant Count rate, age 16+ 2.3% 3.1%
Claimant Count rate, age 16+, male 2.8% 3.8%
Claimant Count rate, age 16+, female 1.8% 2.5%
2.4.11 Housing Market – Table 12 shows that the average house price
for all types of property in Perth and Kinross (February 2024) was
£57,253 above Scottish average prices for the same period.  The
average house price across all the individual house types
(detached, semi-detached, and terraced), apart from flats or
maisonettes, was also higher in Perth and Kinross for the same
period.   The average house price (all types of property) has
steadily increased month on month (apart from during January
2024) during the 12-month period March 2023 to February 2024,
which an overall percentage increase of 5% on the March 2023
figure.  
Table 12: Housing Market (February 2024)
Indicator Perth and
Kinross Scotland
Average house price (all types of
property) £245,253 £188,000
Detached house price average £375,855 £338,000
Semi-detached house price average £236,304 £201,000
Terraced house price average £180,246 £157,000
Flats or Maisonettes £126,897 £130,000
2.4.12 Employment Land - Perth and Kinross has above average levels of
employment in accommodation and food services, agriculture,
forestry and fishing and mining, quarrying and utilities reflecting
its attractiveness from a tourism perspective and its traditional
employment base.  These are not generally sectors which have a
large employment land/property requirement (in terms of
planning use classes).  The Area has below average levels of
employment in health, business administration and support
services, professional, scientific, and technical and information
and communication.  As such, Perth and Kinross potentially has a
lower overall employment land requirement than an ‘average’
Scottish local authority.
2.4.13 The principal employment property locations in the area are
Inveralmond Industrial Estate and North Muirton Industrial Estate,
within Perth City itself.  There is also notable stock around Crieff,
Blairgowrie, Kinross, Errol, and Aberfeldy, with most of the smaller
towns throughout the Council Area having some industrial units.

Page 61

61
Take-up of employment land within the Perth and Kinross Area
over the last 8 years can be averaged at 2.1 Ha per annum.  
Social Characteristics
2.5.1 The social characteristics of the Perth and Kinross Council Area are
explored in more detail across several of the issues in this
Evidence Report, but particularly those relating to Design, Quality
and Place, Flood Risk and Water Management, Homes (including
Rural Development), Infrastructure, Local Living and 20 Minute
Neighbourhoods, and Tackling the Climate and Nature Crises. 
However, the following paragraphs provide an overview of those
characteristics to help set out the profile of the Council Area
across the range of prescribed characteristics in the Planning Act. 
2.5.2 The 2020 Scottish Index of Multiple Deprivation (SIMD) data tells
us that 39 out of 186 (21%) of all data zones in the Perth and
Kinross Area are ranked in the 40% most deprived areas in
Scotland; 7 out of 136 (4%) are within the 15% most deprived; 3
out of 186 (2%) are within the 10% most deprived areas, and 44
out of 186 (24%) are within the 20% least deprived areas in
Scotland.  The 10% most deprived areas in Perth and Kinross can
be found in Perth (Muirton, and Hillyland, Tulloch and
Inveralmond), and Blairgowrie East (Rattray).
2.5.3 The Scottish Household Survey (SHS) is a useful data source which
provides us with a picture of how residents of Perth and Kinross
feel or perceive different aspects of their neighbourhoods and
communities.  The 2022 results tell us that typically most
residents are happy with their neighbourhoods as a good place to
live.  However, some perceived there to be, or they have
experienced problems within their neighbourhoods, mostly linked
to issues that are not within the influence of the land use planning
system, e.g., littering and animal related noise, neighbour
disputes, rowdy behaviour etc., with the results all being quite
similar to the Scotland average for these answers. 
2.5.4 Overall, a large percentage of participants indicated that they felt
like they belong to a community, which is a good representation
of the feeling of community experienced across the area.  Most of
both males and females, disabled and non-disabled persons, met
socially with others at least once per week or more, with the
figures mirroring the Scotland averages also.  The reported feeling
of loneliness across the participants group was quite low, which is
very positive considering the rural nature of large parts of the
Council Area.
2.5.5 In terms of perception of safety when walking alone after dark, a
higher percentage of males over females felt very or fairly safe,
and a higher percentage of females than males felt very or a bit
unsafe.  Overall, most participants felt reasonably safe.   
2.5.6 The Office of National Statistics personal wellbeing indicators
relate to: overall estimates of life satisfaction; the feeling that the
things done in life are worthwhile; happiness, and anxiety.   Please

Page 62

62
note for the figures in Table 13, for the Anxiety indicator, a lower
score is better, and for the Happiness, Life Satisfaction, and
Worthwhile indicators, a higher score is better. 
2.5.7 Encouragingly, in 2022/23, the Perth and Kinross Area scored
lower than the Scottish average for the Anxiety wellbeing
estimate, and higher for the Life Satisfaction and Worthwhile
scores.  However, in terms of the Area’s Happiness score, it was
estimated to be slightly lower than the national average.  
Table 13: Wellbeing Measures (2022/23)
Indicator Perth and
Kinross
Scotland
Anxiety score 3.02 3.21
Happiness score 7.33 7.39
Life satisfaction score 7.56 7.49
Worthwhile score 7.91 7.74
Built Heritage Characteristics
2.6.1 The Perth and Kinross Area has a rich, strong, and varied human
past which is demonstrated through the number and quality of
sites of historic, architectural, archaeological, and cultural
importance.  These sites include a diverse range of archaeological
sites, conservation areas, designed landscapes, historic
battlefields, listed buildings, palaces, and stately homes. 
2.6.2 Table 14 outlines some of the key information for the Perth and
Kinross Area’s heritage assets.  Further details about these assets
and maps showing their spatial distribution are provided under
the Historic Assets and Places issue of this Evidence Report. 
Table 14: Heritage Assets within the Perth and Kinross Area
Heritage Asset Type Total Number
Designated Conservation Areas:
Aberfeldy, Abernethy, Baledgarno, Birnam,
Blair Atholl, Blairgowrie, Cleish, Comrie,
Coupar Angus, Crieff, Dunkeld, Dunning,
Errol, Forgandenny, Fortingall, Fowlis
Wester, Grandtully & Strathtay, Inchture,
Kenmore, Kinnesswood, Kinross, Kinrossie,
Knapp, Longforgan, Meikleour, Muthill,
Moulin, Perth Central, Perth Kinnoull,
Pitcairngreen, Pitlochry, Rait, Scotlandwell,
Spittalfield, St. Fillan’s, Wester Balgedie
362F
Listed Buildings: Category A: 168; Category
B: 1443; Category C: 1510 3121
Listed Buildings on the Buildings at Risk
Register 105
Designated Scheduled Monuments 683
Gardens and Designed Landscapes:
Abercairny, Aberuchill Castle, Balmanno,
Battleby, Blair Adam, Blair Castle,
Bolfracks, Braco, Branklyn, Castle Menzies,
Cleish Castle, Cluny House, Craighall
Rattray, Drumkilbo, Drummond Castle,
Dunira, Dunkeld House, Dupplin Castle,
Errol Park, Falls of Bruar, Fingask Castle,
Glendoick, Gleneagles Hotel and Golf
Courses, Grantully Castle, Inchyra,
Invermay, Keillour Castle, Kinfauns Castle,
41

Page 63

63
Heritage Asset Type Total Number
Kinross House, Meggernie Castle,
Megginch Castle, Meikleour, Methven
Castle, Monzie Castle, Murthly Castle,
Ochtertyre, Rossie Priory, Scone Palace,
Stobhall, Taymouth Castle, The Hermitage
Inventory of Historic Battlefields Sites:
Battle of Dunkeld, Battle of Dupplin Moor,
Battle of Killiecrankie, Battle of Tippermuir
4
Undesignated Archaeological
Sites/Remains on Council’s Historic
Environment Record
15,472
Environmental Characteristics
2.7.1 The environment of Perth and Kinross is rich and varied, which is
evidenced through its many designated sites.  Approximately 36%
of the area is designated under national or international
legislation to protect landscape, habitats, and species, and around
27% is designated under a local designation for landscape alone.  
2.7.2 Tables 15 and 16 outline the range of designations and key
environmental assets covering the area.  These are considered in
more detail in the Biodiversity and Natural Places issue of this
Evidence Report and the SEA Scoping Report (Core Doc Ref:
CD005)
Table 15: Designations within Perth and Kinross
Relevant Designation Total Number
and/or Area
National Scenic Areas (NSA):
Loch Rannoch and Glen Lyon, Loch Tummel,
River Tay, and River Earn
The Ben Nevis and Glen Coe NSA is also
partially within the Perth and Kinross
Council Area.
4
Wildland Areas
Breadalbane/Schiehallion, Lyon/Lochtay,
Ben Lawers, Rannoch/ Nevis/ Mamores/
Alder, and Cairngorms
5
Local Landscape Areas (LLAs):
Rannoch Forest, Loch Lyon and Loch an
Daimh, Loch Tay, Strath Tay, Ben Vrackie,
Glen Quaich, Sma’Glen and Glen Almond,
Upper Strathearn, Sidlaw Hills, Ochil Hills,
and Loch Leven and Lomond Hills
11 sites
covering
144,400 Ha
National Nature Reserve Areas:
Ben Lawers, Loch Leven, and Mar Lodge
Sites are wholly or partially within PKC Area.
3 
Ramsar Sites:
Firth of Tay and Eden Estuary, Loch Leven,
Rannoch Moor, and South Tayside Goose
Roosts
4
Special Areas of Conservation (SACs):
Beinn a’ Ghlo,Ben Heasgarnich, Ben Lawers,
Black Wood of Rannoch, Craighall Gorge,
Drumochter Hills, Dun Moss and Forest of
Alyth Mires, Dunkeld-Blairgowrie Lochs,
Firth of Tay and Eden Estuary, Glenartney
22 sites
covering
75,691 Ha

Page 64

64
Relevant Designation Total Number
and/or Area
Juniper Wood, Keltneyburn, Methven Moss,
Pitkeathly Mires, Rannoch Moor, River Tay,
Shelforkie Moss, Shingle Islands, Tulach Hill
and Glen Fender Meadows, Turflundie
Wood, and Upper Strathearn Oakwoods
Sites are wholly or partially within PKC Area.
Special Protection Areas (SPAs):
Caenlochan, Cairngorms Massif, Drumochter
Hills, Firth of Tay and Eden Estuary, Forest of
Clunie, Loch Leven, Rannoch Lochs, and
South Tayside Goose Roosts
8 sites
covering
232,318 Ha
Special Sites of Scientific Interest (SSSIs)
92 out of the 112 sites are designated for
biological reasons, 13 for geological reasons,
and 7 are mixed.
112 sites
covering
71,008 Ha
RSPB Important Bird Areas 
7 sites
covering
approx. 44,000
Ha
Ancient Woodland Inventory (AWI) Sites
(Ancient and Semi-Natural Woodland) 57,000 Ha
Table 16: Key Facts – Other Important Environmental Assets
Other
Environmental
Assets
Key Facts
Existing
Woodland Cover
18% of total land area of Perth and Kinross
(968.8 Km2) is covered by woodland.  Of
that, approximately:
Other
Environmental
Assets
Key Facts
 48.1% is Conifers
 18.1% is Broadleaved
 51.6% is Native Woodland
 1.2% is Nearly Native Woodland
Nationally
Important Soils
 58,983.89 Ha of Scotland’s Class 1
Nationally Important Soils are within
Perth and Kinross.
 29,437.37 Ha of Class 2
 22,685.4 Ha of Class 5
Wetlands  Approximately 29,310 Haof wetlands
within Perth and Kinross.
Protected Sites
and Species
 75.3% of protected biological and
mixed SSSI features within Perth and
Kinross are in favourable condition
(June 2022).
 75.5% of protected nature sites
within the area are in favourable
condition (June 2022).
 51.4% of all 1 Km grid squares
covering the area had recordings for
protected species (protected by
European and UK Legislation).
Surface Water
Quality Status
In 2023, approximately: 
 9% (20 waterbodies) of surface
waters in Perth and Kinross were
classified as having overall high-
quality water status

Page 65

65
Other
Environmental
Assets
Key Facts
 46% (97 waterbodies) were classified
as having overall good status
 28% (60 waterbodies) as having
overall moderate status.
 13% (27 waterbodies) as having
overall poor status, and 
 4% (8 waterbodies) as having an
overall bad water quality status. 
 Areas in the North, Northwest and
West contained areas of bad surface
water quality status, and areas
primarily to the North, East and South
contained areas of poor surface
water quality status.  
PRINCIPAL PURPOSES FOR WHICH THE LAND IS USED
2.8.1 There are 112 defined settlement boundaries identified in the
Adopted Perth and Kinross Local Development Plan 2.  These range
in scale from the largest, Perth City, through to the smallest
settlement, Cosieville in Highland Perthshire.  They cover a total
land area of 8,266 Hectares.   It is important to note that a range of
land uses exist within a settlement, and not all land within a
defined boundary has been developed.  
2.8.2 Nature Scot’s Habitat Map of Scotland (HabMoS) (Core Doc Ref:
CD010) is the publication of all available habitat data and uses The
European Nature Information System (Core Doc Ref: CD011) or
EUNIS to standardise that data in order to map habitats and land
use across Scotland.   The most recently updated version of this
map was in March 2022. 
2.8.3 Whilst HabMoS is a key dataset in providing us with information
regarding the breakdown and distribution of habitat types across
Perth and Kinross from an ecological perspective, it is also helpful in
setting out the percentage coverage of the Council Area, which is
used for agricultural and horticultural purposes, and those areas
which are developed.  Table 17 and Figure 9 to follow identify the
main land cover categories covering Perth and Kinross.

Page 66

66
Table 17: HabMoS Key Land Cover Types within the PKC Area
Land Cover Type and EUNIS Codes Area (Ha) % of Perth and Kinross
A - Marine Habitats 384 0.07%
B – Coastal Habitats 0 0
C – Inland Surface Waters 11,384 2.15%
D – Mires, Bogs, and Fens 37,155 7.03%
E – Grasslands and Lands Dominated by Forbs, Mosses, or Lichens 48,131 9.11%
F - Heathland, Scrub and Tundra 44,357 8.39%
G - Woodland, Forest, and Other Woodland Land 119,059 22.52%
H – Inland Unvegetated, or Sparsely Vegetated Habitats 3,062 0.58%
I – Regularly, or Recently Cultivated Agricultural, Horticultural, and Domestic Habitats 116,233 21.99%
J – Constructed, Industrial, and Other Artificial Habitats 267 0.05%
X – HES: Historic Land Use Assessment 1614 0.31%

Page 67

67
Figure 9: Habitat Map of Scotland (HabMoS) – The Perth and Kinross Council Area

Page 68

68
SIZE,COMPOSITION,HEALTH AND DISTRIBUTION OF POPULATION OF
THE AREA
Population – Estimates, Projections and Profile
2.9.1 In the most recently published National Records of Scotland 2021
mid-year population estimates, the population of Perth and
Kinross was calculated as being 153,810 residents, which is an
increase of 1.3% from 151,910 in 2020.   Over the same period,
the population of Scotland increased by 0.3%.   Perth and Kinross
had the 12th highest population in 2021, out of all 32 council
areas in Scotland.  
2.9.2 Between the period 2018 to 2028, the population of Perth and
Kinross has been projected to increase by 1.0% from 151,290 to
152,779 (which is less that the most recent mid-year population
estimate figure for the area), this compares to a projected
increase of 1.8% for Scotland as a whole. 
2.9.3 Some of the key figures from the mid-year estimates for Perth and
Kinross tell us that in 2021:
 There were more females (50.8%) than males (49.2%) living in
the area. 
 The largest age group was the 45 to 64 group, with a
population of 43,806.
 The smallest age group was the 16 to 24 group, with a
population of 13,838.
6 Note: totals have been rounded to the nearest 10 at council level. 
 In 3 out of the 6 age group ranges i.e. 0 to 15, 16 to 24, 25 to
44, 45 to 64, and 75 and over, more females lived in Perth and
Kinross than males. 
 Between 2001 and 2021 the 0 to 15 age group saw the largest
percentage decrease (-5.2%), and the 75 and over group saw
the largest percentage increase (+48.9%). 
 Between 2018 and 2028 the average age of the population of
the area is projected to increase as the ‘baby boomer’
generation ages and more people are expected to live longer.
 Between 2018 and 2028 the 0 to 15 age group is projected to
see the largest percentage decrease (-8.1%), and the 75 and
over age group is projected to see the largest percentage
increase (+30.8%).  The 45 to 64 age group is expected to
remain the largest group.
Population – Migration
2.9.4 During the period 2020-21, the level of in-migration i.e. people
moving into the Perth and Kinross Area, was 79303F6F6, which
was a 49.9% increase from the period 2019-20 (5290).  The level
of out-migration, which is people moving away from the area, was
5400 – an increase of 18.2% from 4570 in 2019-20.  In 2020-21,
Perth and Kinross had the 3rd highest level of net migration out of
the 32 council areas, with a total net migration of 2530 people. 
During this period, the net migration in the area was higher for
females (1307) than for males (1223), and the age group with the
highest level of total net migration was the 30 to 34 group (296).

Page 69

69
Notably the age group with the lowest level of net migration was
15 to 19 (-151).
Population – Births, Deaths, and Life Expectancy
2.9.5 In 2022, there were 1153 births in Perth and Kinross - 49.1% of
which were female, and 50.9% were male.  This is a decrease of
3.4% on the 1194 births in 2021.  The standardised birth rate for
the Council Area decreased from 9.7 per 1000 population in 2021,
to 9.2 in 2022.  As a comparison, the rate in Scotland overall
decreased from 8.7 to 8.6 during that same period.  
2.9.6 The most common age group of mothers in 2022 was the 30 to 40
group (400 births), which was the same as in 2002.  The least
common age group was the 0 to 19 group (24 births) – a change
from the 40 and over group which was the least common age
group in 2002.  Between 2002 and 2022, the 0 to 19 age group has
seen the greatest percentage decrease in births (-68.8%), and the
40 and over group the greatest percentage increase (+16.2%).  
2.9.7 The total fertility rate of the area has decreased from 1.44 in 2021
to 1.4 in 2022.  Perth and Kinross had the 22nd highest rate in
2022 out of the 32 council areas, and it was higher than the rate
for Scotland as a whole (1.28). 
2.9.8 In 2022, there were 1922 deaths in Perth and Kinross.  This
represented a 5.5% increase from the 1821 deaths recorded for
2021.  Of these 1922 deaths, 945 (49.2%) were female, and 977
(50.8%) were male.   The standardised death rate for the area
decreased from 12.0 per 1000 of the population in 2021, to 10.0
in 2022.  During the same period, the rate in Scotland overall
decreased from 11.6 to 11.5.
2.9.9 In 2022, the 90 and over age group saw the highest number of
total deaths (427), and the 5 to 9 ages group saw the fewest (0). 
The most common age group for females was the 90 and over
(259), and the 80 to 84 group (170) for males.  
2.9.10 An analysis by the National Records of Scotland of the leading
cause of death in Perth and Kinross, found that for males in 2022,
Ischaemic heart diseases was responsible for 11.1% of all deaths,
followed by Dementia and Alzheimer’s Disease (7.8%).  This
mirrors the leading cause of death for males in Scotland overall,
with 14.0% being attributed to Ischaemic heart diseases, followed
by Dementia and Alzheimer’s Disease at 6.8%.
2.9.11 In terms of females in the area, the same analysis identified the
leading cause of death in 2022 was Dementia and Alzheimer’s
Disease (12.7% of all female deaths), followed by Cerebrovascular
disease (7.9%).  For comparison, in Scotland overall for the same
period, Dementia and Alzheimer’s Disease was the leading cause
of death for females (13.1%), followed by Ischaemic heart
diseases (8.7%).  
2.9.12 In terms of life expectancy in Perth and Kinross, at birth, the life
expectancy for females is higher than for males, at 82.7 years and

Page 70

70
78.9 years respectively (2019-2021).  However, male life
expectancy at birth has increased at a faster rate than that for
females between 2001-03 and 2019-21.  The life expectancy at
birth in Perth and Kinross is higher than at a Scotland level for
both females and males.
Population – Health and Wellbeing
2.9.13 Public Health Scotland’s online ScotPHO tool provides a health
and wellbeing profile for Perth and Kinross across a number of
indicators.  Some of those headline indicators and their results are
reported in the paragraphs to follow under their relevant
categories, as defined on ScotPHO.   An extract has also been
included for each of the indicator categories to visually show how
Perth and Kinross compares relative to the Scotland average. 
Figure 10 provides a key for interpreting the results charts in
Figures 11 to 21.
Figure 10: ScotPHO Key for Indicators Results Tables
2.9.14 Health and Wellbeing: Behaviours - Across the ‘Behaviours’
category, Perth and Kinross was statistically like the rest of
Scotland as a whole for most indicators, and was also statistically
significantly better in terms of indicators for ‘Alcohol-related
hospital admissions’ and ‘Smoking attributable deaths.’  The only
indicator for which the area came out as worse than the Scottish
average was for the percentage of people smoking during
pregnancy, which was 14.1% compared to the national figure of
12.92% during the 3 financial year period 2019/20 to 2021/22.
Figure 11: ScotPHO Perth and Kinross Profile – Behaviours
2.9.15 Health and Wellbeing: Crime - For all indicators reported under
Crime, apart from ‘Prisoner population’, Perth and Kinross came

Page 71

71
out statistically significantly better than the Scottish figure, and
even then, it was slightly higher than the national value.
Figure 12:ScotPHO Perth and Kinross Profile – Crime
2.9.16 Health and Wellbeing: Economy – For all indicators under the
‘Economy’ category, the Perth and Kinross Council Area
performed statistically significantly better than the Scottish
average. 
7 Scottish Credit and Qualifications Framework
Figure 13: ScotPHO Perth and Kinross Profile – Economy
2.9.17 Health and Wellbeing: Education - The data under the ‘Education’
category presents a slightly mixed picture for the Council Area.  In
terms of the indicators for: Secondary school attendance by
looked after children; Working age adults with low or no
educational qualifications, and Secondary school attendance in
general, the area performs statistically significantly better than
the Scottish average values.  However, for the indicators relating
to School leavers in positive destinations, and School leavers with
1 or more qualifications at SCQF4F7F
7 Level 6, Perth and Kinross
comes out statistically lower than the Scottish average.  Finally, in
respect of the Annual participation (in education, training, or
employment) measure for 16–19-year-olds, and School leavers
with 1 or more qualifications at SCQF Level 4, Perth and Kinross

Page 72

72
performs slightly better and about the same, respectively, than
the Scottish average figures. 
Figure 14: ScotPHO Perth and Kinross Profile – Education
2.9.18 Health and Wellbeing: Environment – Under the Environment
category, the Perth and Kinross Area is performing statistically
significantly worse compared to the Scotland average in terms of
the percentage of the area’s population who are living in the 15%
most ‘access deprived’ areas.  In relation to the indicators on
neighbourhood rating and proximity to a derelict site, the Perth
and Kinross Area is performing statistically significantly better
than the Scotland average figures for the same indicators.
Figure 15: ScotPHO Perth and Kinross Profile – Environment
2.9.19 Health and Wellbeing: Ill Health and Injury - For all indicators
under the Ill Health and Injury category, the Perth and Kinross
Council Area is performing statistically significantly better than the
Scotland average. 
Figure 16: ScotPHO Perth and Kinross Profile – Ill Health and Injury
2.9.20 Health and Wellbeing: Mental Health - When considering the
results of the Mental Health category indicators, we can see that
the Council Area is performing statistically significantly better than
the Scotland average in terms of the percentage of the population

Page 73

73
who have been prescribed medication for anxiety, depression, or
psychosis.  However, the recorded number of deaths from suicide
across the area from 2017 to 2021 per 100,000 of the population
is just slightly higher than the Scotland average figure, and the
level of psychiatric patient hospitalisations between 2019/20 to
2021/22, per 100,000 of the population is significantly worse than
that of the Scotland average for the same period. hFigure 17:
ScotPHO Perth and Kinross Profile – Mental Health
2.9.21 Health and Wellbeing: Immunisation and Screening - In relation
to the indicators relating to uptake of immunisations and
screening programmes, the Council Area is performing statistically
significantly better that the Scotland average on bowel and breast
screening uptake; almost the same in terms of immunisations 6 in
1 uptake at 24 months, and statistically significantly worse for
uptake of MMR immunisations at 24 months.
Figure 18: ScotPHO Perth and Kinross Profile – Immunisation and
Screening
2.9.22 Health and Wellbeing: Women and Children’s Health - For most
indicators in this category, the Council Area is performing
statistically significantly better than the Scotland average, and for
the remaining 2 indicators for ‘Healthy birth weight’ and ‘Teenage
pregnancies’ it is not statistically significantly different to the
Scotland average figures.

Page 74

74
Figure 19: ScotPHO Perth and Kinross Profile – Women and
Children’s Health
2.9.23 Health and Wellbeing: Life Expectancy and Mortality – Looking at
the results under this category, the Perth and Kinross Council Area
is performing, for most indicators, statistically significantly better
than the Scotland average, or about the same for a few of the
indicators.
Figure 20: ScotPHO Perth and Kinross Profile – Life Expectancy and
Mortality
2.9.24 Health and Wellbeing: Social Care and Housing - For 2 out of the
4 indicators for the Social Care and Housing category (‘Children
looked after by the local authority’, and ‘single adult dwellings’),
the Council Area is performing about the same as the national
average.  In relation to the percentage of adults who are claiming
incapacity benefit or severe disability allowance, the Area is
performing statistically significantly better.  However, the
percentage of people aged 65+ in Perth and Kinross with high
levels of care needs who are cared for at home is much lower than

Page 75

75
the Scotland average, and as such the Area is performing
statistically significantly worse.
Figure 21: ScotPHO Perth and Kinross Profile – Social Care and
Housing
2.9.25 The ScotPHO data provides us with a very useful profile of how
the health and wellbeing of the population of Perth and Kinross
compares overall to that of the Scotland average.  For most of the
indicators under the Health and Wellbeing category, the Council
Area is performing either statistically significantly better, or
similar to that of the national average.  However, for some,
namely those indicators in relation to – older members of the
Area’s population with high levels of care who are being cared for
at home, rather than in a health or social care facility; MMR
immunisations uptake; psychiatric patients hospitalisation rates;
and the percentage of people living in the 15% most access
deprived areas, the Perth and Kinross Area is performing
statistically significantly worse than the national average figures
for the same indicators.   
RURAL AREAS AND POPULATION DECLINE
2.10.1 Part 2, Section 16B(3) and Section 15(5)(cf) of the Planning Act
2019, in the preparation of their Evidence Report, requires
planning authorities to provide their views on the extent to which
there are rural areas within the Plan Area which have experienced
a substantial decline in population. 
2.10.2 The Scottish Government’s Urban Rural Classification establishes a
consistent means of defining urban and rural areas across
Scotland.  The classification is based on the two main criteria of
population and accessibility.  The most recent publication is the
Scottish Government Urban Rural Classification 2020, (Core Doc
Ref: CD012) which was released in May 2022.   It groups
settlements into 4 categories and classifies accessibility using 3
categories, and reports it for a 6-fold category and 8-fold
category:
1. Large Urban Areas – populations of 125,000 or more
2. Other Urban Areas – populations of 10,000 to 124,999
3. Small Towns – populations of 3000 to 9999
4. Rural Areas – populations of less than 3000
1. Accessible – areas within 30-minute drive of a settlement with
a population of 10,00 or more.

Page 76

76
2. Remote - areas that are more than a 30-minute drive (6-fold
classification) or areas that have a drive time of between 30
and 60 minutes (8-fold classification) from a settlement with a 
3. population of 10,000 or more.
4. Very Remote - areas that are more than a 60-minute drive time
from a settlement with a population of 10,000 or more (using
the 8-fold classification only).
2.10.3 Table 18 and Figure 22 to follow set out the 6-fold Urban Rural
categories for the Perth and Kinross Area and tells us that slightly
more people in Perth and Kinross live in rural and remote areas
compared to those which live in urban and accessible small towns
(56.8% of the population versus 43.4%), highlighting the strong
rural nature of the area.
Table 18: Percentage of PKC Population in 6-Fold Categories
Large
Urban
Other
Urban
Accessible
Small
Towns
Remote
Small
Towns
Accessible
Rural
Remote
Rural
1.2% 31.2% 11% 10.9% 35% 10.9%

Page 77

77
Figure 22: Perth and Kinross 6-Fold Urban Rural Classification

Page 78

78
2.10.4 As reported above, the National Record of Scotland mid-year
estimates 2021 showed a 1.3% increase in population from 2020,
and the population of Perth and Kinross is projected to continue
to increase in the period to 2028.  Although the overall picture in
Perth and Kinross is one of population growth, that growth has
not been evenly distributed across the Plan Area.  
2.10.5 As explored in more detail under the Rural Development issue of
this Evidence Report, there are several areas within Perth and
Kinross which have seen a decline in population of more than 6%. 
This ranges from a 6% fall in the Comrie, Gilmerton and St Fillan’s
datazone, to an 11.5% decline in the Rannoch and Aberfeldy
datazone.  Of the 8 datazones with a population decline of 6% or
more, 3 are Remote Rural Areas.  The other 5 datazones are
Accessible Rural Areas showing that even in the more accessible
parts of Perth and Kinross there are still pockets where the
population has been in decline.
2.10.6 Scottish Government-funded research identifies those parts of
Scotland where less than 10,000 people can be reached within 30
minutes travel using roads and ferries.  One of these Sparsely
Populated Areas incorporates part of the Perth and Kinross Area. 
Overall parts of the Highlands and northern Scotland (including
Perth and Kinross and Stirling Sparsely Populated Area) are
8 (Scottish Government Advisory Group: Place-based policy approaches to
population challenges – Lessons for Scotland, P4)
projected to lose between 13% and 17% of their overall
populations, and more than 20% of their working age populations
from 2018 to 2043 if current trends continue.
2.10.7 Further Scottish Government research8F
8 considers how population
within individual datazones has been changing with a view to
identifying those areas with high numbers of ‘shrinking’
datazones.  In general, the sparsely populated areas, very remote
rural areas, and very remote small towns are the most affected. 
The least affected are generally accessible rural areas.  
2.10.8 In Perth and Kinross 12 datazones are identified as shrinking. 
However, this only accounts for 6.5% of all datazones in the area
and 5.5% of the overall population, meaning that across Scotland
Perth and Kinross ranks 29th, both in terms of percentage of the
number and population living within shrinking datazones.
2.10.9 Please refer to the Rural Development issue of this Report for
further information regarding Scottish Government identified
population challenges, and the issues relating to these, and what
they mean for rural areas of Perth and Kinross and meeting the
housing needs of the population.

Page 79

79
HEALTH NEEDS OF THE POPULATION OF THE AREA
2.11.1 Part 2, Section 16B(3) and Section 15(5)(cd) of the Planning Act
2019, in the preparation of their Evidence Report, require
planning authorities to set out their views on the health needs of
the population of the plan area, and the likely effects of
development and use of land on those health needs.  As this
matter has been explored in more detail under the Infrastructure
– Health Care Facilities issue of this Evidence Report, a brief
overview of the key challenges in terms of the health needs of the
population of Perth and Kinross is presented here.  
2.11.2 The Perth and Kinross Integration Joint Board Strategic
Commissioning Plan 2020-2025 Strategic Needs Assessment has
enabled local population profiles to be developed, and these
highlight the following key messages and challenges with respect
to the health needs of the population of Perth and Kinross:
 Life expectancy is lower in the most deprived areas, primarily
Perth City. 
 An increase in the over 85-year-old age group and with
increasingly complex needs is expected. uThere is a growing
population of older people in North Perthshire.
 31.5% population are access deprived due to the rural nature
of Perth and Kinross. 
 Approximately 30% of people are living with long-term
conditions and this is associated with age and income
deprivation. 
 Poor mental health affects more people in deprived areas. 
 Uptake of support from the Drugs and Alcohol Team is greater
in Perth City than in either the North or South Perthshire
Localities.
 There is a growing ageing population of people with learning
disabilities.
 Several specific long-term conditions are more prevalent in
Perth and Kinross than in Scotland as a whole.  These are:
Hypertension, Hypothyroidism, Coronary Heart Disease,
Cancer, and Dementia. 
2.11.3 In considering the ScotPHO indicator profiles for the area, as
previously highlighted under the Population section of this Report,
for most of the indicators under the Health and Wellbeing
category, the Council Area is performing either statistically
significantly better, or like that of the national average.  However,
for some, namely those indicators in relation to – older members
of the Area’s population with high levels of care who are being
cared for at home, rather than in a health or social care facility;
MMR immunisations uptake; psychiatric patients hospitalisation
rates; and the percentage of people living in the 15% most access
deprived areas, the Perth and Kinross Area is performing
statistically significantly worse than the national average figures
for the same indicators.

Page 80

80
EDUCATION NEEDS OF THE POPULATION OF THE AREA AND SERVICE
CAPACITY
2.12.1 Part 2, Section 16B(3) and Section 15(5)(ce) of the Planning Act
2019, in the preparation of their Evidence Report, require
planning authorities to set out their views on the education needs
of the population of the plan area, and the likely effects of
development and use of land on those needs.  Part 2, Section
16B(3) and Section 15(5) (ce)(cg)(d) and (e) of the Act also require
planning authorities to set out their views on the capacity of
education services in the plan area, and how that infrastructure is
used.   A more in-depth analysis of the education needs of the
people of Perth and Kinross and the existing service provision and
its capacity, is provided under the Infrastructure – Education
Facilities issue (020) of this Evidence Report, but an overview of
that work is provided in the paragraphs to follow.
2.12.2 In summary, the Council’s Education and Children’s Services
Learning Estate Strategy informs us that education infrastructure
in the Perth and Kinross Area continues to serve the local
population adequately.  2.12.3  Some of the key
considerations which the Council considers when determining the
capacity of its education services are - demographics; the
condition, suitability, distribution, capacity and suitability of the
learning estate; additional support needs across the area, and any
planned development (LDP site allocations and proposals via
planning application process).  A summary for each of these
elements is set out below. 
2.12.4 Demography - In terms of the demographic profile of the area,
population projections indicate the population of Perth and
Kinross is expected to increase by 1% between 2018 and 2028. 
However, it is worth noting that between 2001 and 2021 the 0 to
15 age group saw the largest percentage decrease (-5.2%), and
the 75 and over group saw the largest percentage increase
(+48.9%), pointing to an ageing population for the Perth and
Kinross Area.  Over the next 10 years, the population of Perth and
Kinross is projected to decrease by 3.5% due to natural change
(more deaths than births).  The number of school-age children in
the area is therefore not expected to increase in population
projections. 
2.12.5 The Learning Estate – The Council’s school estate is made up of 69
primary schools, 11 secondary schools, 1 stand-alone nursery, and
1 Additional Support Needs (ASN) school.  Perth and Kinross
Council currently has 6 community campuses.  
2.12.6 Investment in the Council’s School Estate was previously  set out
through the School Estate Transformation Programme.  The
investment in the school estate addressed issues arising from
changing population, house building in certain locations (including
LDP site allocations across the area), ongoing deterioration in
building infrastructure, pressure on planned maintenance

Page 81

81
budgets, and the extension to Early Years Provision and Free
School Meals.  A total of £81m has been invested in the School
Estate since 2015/2016, and the programme will deliver £160m of
further improvements to the Learning Estate between 2021 and
2029.  The Council approved its updated 8-year capital
programme in October 2021. 
2.12.7 Condition of Primary and Secondary School Estates – The
majority of schools published as part of the Scottish Government
School Estate Statistics 2024 were rated ‘Good’ and ‘Satisfactory’. 
However, 1 primary and 1 secondary school were rated ‘Poor’. 
This classification is defined as “showing major defects and/or not
operating adequately…”.  No schools were rated ‘Bad’, and the
Additional Support Needs school was rated ‘Satisfactory’.  
2.12.8 Suitability – The majority of schools published as part of the
Scottish Government School Estate Statistics 2024 were rated
‘Good’ and ‘Satisfactory’.  However, 1 primary and 2 secondary
schools were rated ‘Poor’ i.e., “showing major problems and/or
not operating optimally (the school buildings and grounds impede
the delivery of activities that are needed for children and
communities in the school)”.  No schools were rated ‘Bad’.  The
Additional Support Needs school was rated ‘Satisfactory’.
2.12.9 Early Years Capacity – The Council’s Education and Children’s
Services anticipate that Early Years infrastructure can
accommodate pupils, based on population changes and
housebuilding activity.  It is not envisaged that the Council’s policy
on developer contributions will be expanded to include Early
Years Provision.
2.12.10 Primary Schools Capacity - According to the Scottish
Government School Estate Statistics 2024, primary school pupil
rolls in Perth and Kinross have decreased in number since 2018,
which is broadly consistent with patterns across Scotland.  69
primary schools in Perth and Kinross were surveyed as part of
the School Estate Statistics and found that some primary schools
in the area have particularly low pupil numbers (11 at less than
50% of capacity) and some have high capacity (5 at 90-100% of
capacity).  Currently no schools are over-subscribed i.e., roll
greater than capacity.   The Scottish Government’s pupil
projections for Perth and Kinross (2022-2027) show a decline in
primary school pupil numbers during this period, which mirrors
the national trend.  
2.12.11 The Council monitors pupil rolls in connection with housing
development projections published in the annual Housing Land
Audit, as well as planning applications for windfall
developments.
2.12.12 In May 2018, Perth and Kinross Council’s Education and Children’s
Services sought approval to use the Scottish Government’s space
capacity metric measurement to manage the accommodation
available in primary schools where there are challenges in

Page 82

82
accommodating catchment children.  This helps to ensure that
teaching staffing budgets are not exceeded whilst ensuring
catchment children have the best opportunity to attend their
catchment school.
2.12.13 Other interventions by the Council may however be required to
accommodate development growth in certain primary school
catchments and support LDP3’s Spatial Strategy, including
extensions and replacement schools to provide further capacity. 
The Council’s developer contributions policy and guidance is
applied to eligible developments to “claw back” a proportion of
this investment for school projects, where additional capacity is
created.   
2.12.14 Secondary Schools - According to the Scottish Government School
Estate Statistics 2024, secondary school pupil rolls in Perth and
Kinross have increased in number since 2017, this is also
consistent with patterns across Scotland.  There are 11 secondary
schools in Perth and Kinross, and the School Estates Statistics
found that 1 school is in the lower capacity quartile and 1 school is
in the higher capacity quartile, again with no schools currently
over-subscribed.  The Scottish Government’s pupil projections for
Perth and Kinross (2022-2027) indicate an increase, then a decline
in secondary pupil numbers during this period, which mirrors the
national trend.  
2.12.15 As is the case with primary schools, the Council’s Education and
Children’s Services monitor pupil rolls in relation to housing
development projections, and it is anticipated that existing
secondary school infrastructure can accommodate pupil
projections, calculated based on population changes and
housebuilding activity.  As such, the Council’s developer
contributions policy approach remains relevant to primary
education capacity requirements and is not envisaged that these
contributions will be required for capacity provision in secondary
schools. 
2.12.16 Additional Support Needs – As previously highlighted the Council
has 1 specialist ASN school, and of the 69 primary schools and 11
secondary schools across our School Estate, 10 have specialist ASN
provision.  
2.12.17 Development – In September 2008 the Council produced a
background paper ‘A methodology for calculating the pupil per
household ratio for areas of new housing developments’, as part
of which was established a pupil product ratio, which is used to
inform the management of our school estate, pupil forecasting,
and development contributions.
2.12.18 Education infrastructure is an essential component in creating and
supporting our local communities.  It is directly impacted by new
housing development, and as such is a key consideration in the
development of our LDP3 spatial strategy through the site

Page 83

83
assessment process.  The principles contained within the Council’s
Learning Estate Strategy are in alignment with NPF4, the National
Investment Hierarchy, and education-specific priorities (the
National Improvement Framework, and Scotland’s Learning Estate
Strategy: Connecting People, Places and Learning).  This prioritises
maximising existing property and infrastructure.

Page 84

84
3  Participation and Engagement
PARTICIPATION AND ENGAGEMENT STATEMENT
3.1.1 The paragraphs to follow provide details of how, in preparing our
Proposed Evidence Report, Perth and Kinross Council has sought
the views of those key stakeholders as set out in Part 2 of the
2019 Planning Act, and the extent to which the views expressed
have been considered. 
3.1.2 In some instances, it may be more relevant to provide details of
how those views expressed have been considered under specific
policy issues.  Please refer to ‘Statements of Agreement and/or
Dispute’ for each issue considered under Chapter 5 ‘Evidence
Gathering - Information on Issues’ of this Report and the
‘Summary of Stakeholder Engagement’ relevant appendices to
view that detail.     
The Public at Large
3.2.1 Engagement with the public forms an essential part of the process
of preparing an Evidence Report.  Section 16B of the Act
prescribes several requirements, including - that the views of the
public are sought, and that the Evidence Report includes a
statement on how the views of the public have been taken into
account.
3.2.2 In meeting these requirements under Section 16B, the Council has
firstly sought the views of the public through our Big Place
Conversation process, using the Place Standard Tool, to find out
what our communities feel is good within their areas, and what
could be improved.  Secondly, our suite of Evidence Report Topic
Papers  (Core Doc Ref: CD013) were publicly consulted upon
through the Council’s Consultation Hub, and amendments were
then made to the relevant chapters and issues of this Evidence
Report taking account of the feedback received.  Where it has
been considered more appropriate to action some suggestions
raised within that feedback at another stage in the plan
preparation process this has been highlighted in response to
individual’s comments under each of the policy issues.  Appendix F
also contains summaries of any place or site specific based
comments received to our LDP3 Topic Papers.    
3.2.3 Development Plan Scheme (DPS) – The DPS is prepared to ensure
everyone has a clear understanding about their role and the
timeline for engagement from the outset, to aid the delivery of an
effective process.  The Development Plan Scheme (Core Doc Ref:
CD014) is updated annually and approved by Committee.  It sets
out the timetable for the preparation of the Local Development
Plan and contains information on opportunities for community
engagement in the planning process, and how and when
stakeholders can get involved. 
3.2.4 The Big Place Conversation (2023): Place Standard Engagement –
The most important part of our engagement with the public at
large has been through the Big Place Conversation (BPC) exercise.

Page 85

85
3.2.5 This extensive engagement process took place from January to
September 2023.  We had an online survey open during this time
on our dedicated BPC webpage, as well as providing opportunities
for communities to feedback through a range of in-person and
online events.   These included public events, drop-in sessions,
and roundtable facilitated Place Standard discussions, which were
both in person and online.  The drop-in sessions were more
informal events to allow for quicker feedback on the Place
Standard topics to complement the roundtable discussions.  Our
engagement gathered feedback from communities on how they
viewed different elements of their place and where they felt
improvements could be made.   
3.2.6 Through our Big Place Conversation engagement, we received 272
survey responses, and nearly 1300 people attended the 114
events which were held during our engagement programme. 
More information about the Big Place Conversation engagement
can be found in our overall Summary Report(Core Doc Ref: CD
015).  The results have also been broken down into summary
reports for Perth and Kinross Council Ward areas, and Community
Council areas, and they have been published on Big Place
Conversation results webpage (Core Doc Ref: CD016).  
3.2.7 The main purpose of these conversations with our communities
was to help shape the next Plan as well as provide an evidence
base for community-based plans and the Councils Mobility
Strategy (Core Doc Ref: CD017).    The evidence has also been
shared widely within the Council and with communities to inform
the development of other strategies and local plans.  
3.2.8 Evidence Report Topic Papers (2024) – As previously mentioned,
the Council produced a series of LDP3 Evidence Report Topic
Papers(Core Doc Ref: CD013), covering the individual subject
matters of NPF4’s suite of National Planning Policy.  These papers,
which set out the detailed evidence the Council has gathered to
help produce our Evidence Report, and which we hope to use to
help prepare our Proposed Plan, were published on the Council’s
Consultation Hub and open for comments for a period of 6 weeks
during July and August 2024.  
3.2.9 As part of our consultation process for LDP3 Topic Papers we
welcomed the views of the public at large, on the sufficiency of
the evidence gathered, our interpretation of the implications of
that evidence to the Proposed Plan, and on how we intend to use
that evidence to develop our LDP3.  We also asked respondents to
provide links to other sources of available information or data
which they felt we had not included, alongside an explanation of
why they considered any additional sources of information to be
relevant to the preparation of the Local Development Plan.  
3.2.10 Under each of the individual issues for this Evidence Report in
Chapters 5 and 6, and Appendices A-E, a summary of the
comments made during the topic paper consultation, whether
they were in dispute, and the Perth and Kinross Council response

Page 86

86
to these comments, including how the Evidence Report has been
amended to take comments into account, has been provided.   
Key Agencies and Other Parties
3.3.1 As part of the development of our topic papers and this Evidence
Report we engaged with the key agencies as prescribed through
the Planning Act.  The key agencies of relevance to the Perth and
Kinross LDP3 Area, and with whom we engaged are: 
 NatureScot
 SEPA
 Scottish Water
 Scottish Enterprise
 Tactran
 NHS Tayside, and
 Historic Environment Scotland
3.3.2 All key agencies were welcome to respond in relation to any of
our topic papers during the 6-week consultation period, but
where feedback was specifically sought on a particular issue, we
sent targeted engagement invitations to key agencies and other
relevant parties/stakeholders flagging those papers we felt were
most relevant and could benefit from their input – see Table 19 to
follow.  
3.3.3 We engaged and worked closely with the following list of internal
Perth and Kinross Council Teams in preparing this Evidence
Report:
 Climate Change and Sustainable Development Team
 Conservation Team
 Culture and Community Service Team
 Employability, Skills and Special Projects Team
 Estates and Commercial Investment 
 Enterprise and Investment
 The Water Team 
 Structures and Flooding
 City and Town Centre Management
 Perth and Kinross Community Planning Partnership
 Property Services – Compliance Team
 Property Services – Education 
 Perth and Kinross Council Transportation and
Development Team 
 Housing Strategy
 Communities – Place Development
 Communities – Safer Communities
 Perth and Kinross Health and Social Care Partnership –
Primary Care Services
3.3.4 During our Big Place Conversation exercise, the other parties
which we engaged with and consulted were:
 Community Development Trusts
 Climate Cafes
 Kinross-shire Partnership
 PKAVS
 Rainbow Heartlands
 Perthshire Businesswomen’s Network

Page 87

87
 Sheltered housing tenants
3.3.5 Table 19 below provides a list of those parties from whom we
sought views in relation to specific NPF4 policy topics.  Where
feedback was received, it has been summarised and responses
provided under the individual issues in Chapters 5 and 6 and
Appendices A-E of this Report.  Where any disputes or concerns
were raised by key agencies, we have sought to resolve those
disputes in advance of finalising this Evidence Report.  In those
instances, the individual issue summaries have recorded the
outcome of those exchanges.

Page 88

88
Table 19: Evidence Report Topic Papers Targeted Engagement
Topic Paper and Issue Ref: Stakeholders consulted/engaged
Topic Paper 001: The Plan Area
(Chapter 2, Evidence Report)
 SEPA, Nature Scot and Historic Environment Scotland (HES)
 Perth and Kinross Health and Social Care Partnership
Topic Paper 004: Tackling Climate and
Nature Crises
(Issue 001)
 Perth and Kinross Climate Commission
 SEPA, Nature Scot
 Tayside Biodiversity Partnership
Topic Paper 005: Biodiversity and Natural
Places
(Issue 002)
 Scottish Environment Link
 Scottish Forestry
 Forestry Commission Scotland
 Peatland Action
 NFU Scotland
 Perthshire Nature Connections Partnership
 NatureScot
 SEPA
 Tayside Biodiversity Partnership
Topic Paper 006: Soils
(Issue 003)
 SEPA, Nature Scot and Historic Environment Scotland (HES)
 James Hutton Institute (JHI)
 Perthshire Nature Connections Partnership (PNCP)
 NFU Scotland
 Neighbouring planning authorities (Aberdeenshire, Angus, Dundee, Highland, Stirling, Fife,
Clackmannanshire, Argyll & Bute, Cairngorms, Loch Lomond & Trossachs)
 Peatland Action
 Forestry Commission Scotland and Scottish Forestry
 Scottish Environment Link
 Scottish Govt
Topic Paper 007: Forestry, Woodland and
Trees
(Issue 004)
 SEPA, Nature Scot
 Scottish Forestry Perth and Argyll Conservancy
 Perth and Kinross Countryside Trust
 NFU Scotland East Central
 Angus Council Environment and Development Planning Team

Page 89

89
Topic Paper and Issue Ref: Stakeholders consulted/engaged
 Cairngorms National Park Planning Team
 The Highland Council Development Plans Team
 Loch Lomond and the Trossachs National Park Authority Planning Team
Topic Paper 008: Historic Assets and Places
(Issue 005)
 Historic Environment Scotland
 Perth and Kinross Heritage Trust
Topic Paper 009: Greenbelt
(Issue 006)
 Nature Scot
 TACTRAN
 Ramblers Scotland
 Local landowners
Topic Paper 010: Brownfield, Vacant and
Derelict Land
(Issue 007)
 HES
 Scottish Enterprise
Topic Paper 011: Coastal Development and
Aquaculture
(Issue 008)
 Tay Estuary Forum
 JHI
 Scotland’s Centre of Expertise for Waters
 Marine Scotland 
 Sniffer 
 Tay and Earn Trust
 PKC Water Team
 PKC Flooding Team
 Nature Scot 
 SEPA
Topic Paper 012: Energy, Heat and Cooling
(Issue 009)
 SEPA, Nature Scot and HES
 PNCP
 NFU Scotland
 Neighbouring planning authorities
 Forestry Commission Scotland and Scottish Forestry
 Scottish Environment Link
 Scottish Renewables
 Scottish Enterprise

Page 90

90
Topic Paper and Issue Ref: Stakeholders consulted/engaged
 Scottish Futures Trust
 National Grid
 SSEN Transmission
 SSEN Distribution
 SP Energy Networks
 Scottish Gas Networks
 Zero Waste Scotland
 Marine Scotland
 Crown Estate
 Binn Eco Park
 Scottish Government
Topic Paper 013: Zero Waste
(Issue 010)
 PKC Waste Services 
014 Infrastructure
(Issues 018-023)
 Perth and Kinross Health and Social Care Partnership
 NHS Tayside
 Scottish Water
 Tactran
 Transport Scotland
Topic Paper 018: Design, Quality and Place
(Issue 011)
 Architecture and Design Scotland
 Public Health Scotland
Topic Paper 019: Local Living and 20 min
neighbourhoods
(Issue 012)
 Tactran
 Cycling Scotland
 Live Active
 NHS Tayside
 Perthshire Chamber of Commerce
 Rural Perth and Kinross LEADER Programme
 Women’s Enterprise Scotland
Topic Paper 020: Homes
(Issue 017)
 Members of the P&K Housebuilders Forum (includes developers and RSLs)
 Homes for Scotland
 Scottish Federation of Housing Associations

Page 91

91
Topic Paper and Issue Ref: Stakeholders consulted/engaged
 Scottish Land and Estates
 Rural Housing Scotland
 National Farmers Union Scotland
 MECOPP
 Scottish Enterprise
Topic Paper 021: Blue and Green
Infrastructure
(Issue 013)
 Tay Estuary Forum
 JHI
 Scotland’s Centre of Expertise for Waters
 Marine Scotland 
 Sniffer 
 Tay and Earn Trust
 PKC Water Team
 PKC Flooding Team
 Nature Scot 
 SEPA 
 PKC Community Resilience
 PKC Flood Responses
 PKC Community Greenspace
Topic Paper 022: Play, Recreation & Sport
(Issue 014)
 SportScotland
 Live Active Leisure
 A Place in Childhood
 Play Scotland
 Neighbouring planning authorities
Topic Paper 023: Flood Risk and Water
Management
(Issue 015)
 Tay Estuary Forum
 JHI
 Scotland’s Centre of Expertise for Waters
 Marine Scotland 
 Sniffer 
 Tay and Earn Trust
 PKC Water Team

Page 92

92
Topic Paper and Issue Ref: Stakeholders consulted/engaged
 PKC Flooding Team
 Nature Scot 
 SEPA 
 PKC Community Resilience
 PKC Flood Responses
Topic Paper 024: Health and Safety
(Issue 016)
 PKC Environmental Health
 Health and Safety Executive
Topic Paper 025: Community Wealth
Building
(Issue 024)
 N/A
Topic Paper 026: Business and Industry
(Issue 025)
 Federation of Small Business
 Scottish Enterprise
 Scottish Land and Estates
 Perth Chamber of Commerce
 Perth City Centre Regeneration Working Group
 Perth City Traders Associations
 Perth City Leadership Forum
 Growbiz
 Agents/consultancies with interests in employment land
 PKC Estates and Investment teams
Topic Paper 027: Retail, City, Town &
Commercial Centres
(Issue 026)
 Federation of Small Business
 Scottish Enterprise
 Perth Chamber of Commerce
 Perth City Centre Regeneration Working Group
 Perth City Traders Associations
 Perth City Leadership Forum
 Agents/consultancies with interests in retail
 PKC Estates and Investment teams
Topic Paper 028: Rural Development
(Issue 027)
 Scottish Land and Estates
 Rural Housing Scotland

Page 93

93
Topic Paper and Issue Ref: Stakeholders consulted/engaged
 Scottish Rural Network
 Forestry and Land Scotland
 Nature Scot
 Scottish Enterprise
 Local landowners and estates
Topic Paper 029: Tourism
(Issue 028)
 Scottish Agritourism 
 Association of Scotland’s Self Caterers
 Visit Scotland
 Forestry and Land Scotland
 Scottish Enterprise
 Local Tourism Associations
Topic Paper 030: Culture and Creativity
(Issue 029)
 Culture Perth and Kinross
Topic Paper 031: Minerals
(Issue 030)
 N/A

Page 94

94
Children and Young People
3.4.1 Big Place Conversation (2023): Place Standard Engagement - We
undertook an extensive programme of engagement with children
and young people across the Council Area as part of our Big Place
Conversation (BPC) engagement.  This involved Place Standard
sessions with primary and secondary schools, as well as dedicated
workshops with established youth groups.  We held 28 dedicated
sessions, which were attended by nearly 400 children and young
people. 
3.4.2 The purpose of the children and young people engagement was to
gather views from this demographic on what they liked about
their place/community and what could be improved.  We used the
Place Standard Tool for Children and Young People for our
engagement, which focuses on the same 14 themes as the
traditional Place Standard Tool. 
3.4.3 In developing the children and young people engagement
programme we engaged with the Council’s Children/Youth
Services Team, youth group leaders, as well as with Members of
the Scottish Youth Parliament (MSYPs).  An invitation to
participate in our engagement was issued to all schools across
PKC, positive responses were then followed up and sessions
arranged for all schools who wished to participate.
3.4.4 Our children and young people engagement comprised a mix of
drop-in sessions with posters and post-it notes, as well as
facilitated, sit-down sessions.  We held sessions across all the
localities in the PKC Area, and these were delivered and facilitated
by Development Plans Team Officers with support from volunteer
planning students.
3.4.5 The results of all the engagement sessions with children and
young people have been recorded in event reports.  These results
have been compiled and are included in our summary reports.  In
particular, our Big Place Conversation overall Summary Report
(Core Doc Ref: CD015) summarises the key issues highlighted by
children and young people across PKC.
3.4.6 Play Sufficiency Assessment - From August to November 2023,
the ‘Playing Out in Perth and Kinross Survey’ was conducted
online to gather insights on the usage of play sites, the types of
activities enjoyed, and areas for improvement.  The survey
featured a mapping tool that allowed for site-specific feedback,
helping to identify private and informal play spaces for further
assessment.  
3.4.7 A total of 322 responses were received from across all localities in
Perth and Kinross.  170 respondents were girls, 135 boys, and 17
preferred not to answer.  Most were aged between 4-8 years old,
followed by the 9-14 age group, and then those aged 15 or over.
3.4.8 The survey primarily targeted children and young people, though
parents and guardians were encouraged to participate.  It was
promoted through the network of schools, youth groups, and

Page 95

95
relevant community groups (including Community Councils) that
was established during the BPC, as well as through PKC’s social
media channels and Consultation Hub.
3.4.9 The survey results are summarised in the Play Sufficiency
Assessment Story Map (Core Doc Ref: CD018), which also includes
an interactive map containing the site-specific feedback received
for formal playgrounds managed by PKC.
3.4.10 PKC Youth Climate Conference - In 2022, we held numerous
workshops with attendees at the Perth and Kinross Youth Climate
Conference.  The conference included secondary school aged
pupils from schools across PKC.  The four workshops – delivered
and facilitated by Development Plans Team Officers – involved
Place Standard discussions using the ‘Climate Lens’ version of the
Place Standard Tool.  The purpose of the workshops was to gather
views from young people on what they liked about their
place/community and what could be improved, focussing on
climate issues.
3.4.11 In 2023, we continued our involvement in the Youth Climate
Conference by hosting another series of four workshops.  This
year's focus was on engagement to help inform the development
of the Council’s Open Space Strategy.  We gathered feedback on
how urban greenspaces could be managed to mitigate and adapt
to climate change.  The feedback was collated into the Big Place
Conversation responses and will contribute to the development of
our Blue Green Infrastructure policy and Spatial Strategy. 
Disabled Persons
3.5.1 Through connecting with established groups within Perth and
Kinross we engaged in conversations with disabled people using
the Place Standard questions in a café style format.  We also
attended organised events to facilitate drop-in opportunities,
which followed the format of other drop-in sessions held across
the Council Area as part of the wider Big Place Conversation
exercise.  Some of the conversations we held were with attendees
at:
 VisionPK coffee mornings in Kinross and Aberfeldy.  VisionPK
(Core Doc Ref: CD019) represents people in our
communities with sight and hearing difficulties.
 We had a lively conversation with attendees from around
Kinross-shire at a meeting of SPARKs in Kinross.  SPARKs is a
dedicated self-support group for adults who consider
themselves to have a disability. 
 We attended the Disability Access Day in a drop-in capacity
inviting one-on-one conversations with attendees. 
 We held conversations with and received valuable feedback
from The Social Care Users Committee in Blairgowrie, and
with the Making Where We Live Better Group for people
with learning difficulties.
3.5.2 In total 40 participants, identifying as disabled persons,
participated via in person events, with a further 22 people taking

Page 96

96
part online.  In analysing the feedback received through our
engagement, we found that comments received from older
people and those living in sheltered accommodation also share
commons concerns with those identifying as disabled who took
part. 
3.5.3 Information on the results can be found in the Big Place
Conversation Report summary which was used in evaluating the
evidence across the various issues for this Evidence Report, and
will help inform the development of our place-based strategies in
the Proposed Plan. 
Gypsies/Travellers
3.6.1 Previous engagement with Gypsy/Travellers in 2022 informed the
Gypsy/Traveller Site Standards Guidance Note (Core Doc Ref:
CD020) .  This covered a range of issues relating to sites, their
location and facilities.  Engagement was also carried out to inform
the design of the proposed transit site in Perth, with this
information being used for the Guidance Note.  
3.6.2 This information gathered as part of the engagement for the
Guidance Note and design of the proposed site in Perth provides a
picture of what is important to people when choosing where to
live and the facilities and services that are needed on site or
nearby.   It will also be taken into account as part of the
development of the Proposed Plan. 
3.6.3 As part of the Big Place Conversation, conversations took place
with private residents of Greenacres, south of Kinross, and with a
small group of residents on Double Dykes in Perth, and 1 person in
settled accommodation.  In 2023 a human rights analysis [Core
Doc Refs: CD21, CD22] was carried out by Making Rights Real with
the residents of the Council owned Gypsy / Traveller site at
Double Dykes. The results of this have been included in the Big
Place Conversation Results. 
3.6.4 A review of Gypsy/Traveller need across Tayside was undertaken
in 2017.  This concluded that there was no immediate shortage of
permanent pitches in Perth and Kinross but there was likely to be
a shortage of transit sites.  The Council carried out engagement
with Gypsy/Travellers to identify historic stopping places and
reviewed these against ownership and safety criteria.  The Council
participated in a Negotiated Stopping Places Pilot, but due to
constraints it became apparent that there were no suitable sites
to direct travellers to.  As a result, a 10-pitch site has been
identified in Perth to meet the greatest need.  An updated
accommodation needs assessment for Gypsy/ Travellers has been
commissioned and is expected to return results in March 2026. 
Community Councils
3.7.1 Big Place Conversation (2023) - Community Councils are key
partners in developing the Local Development Plan.  As part of the
Big Place Conversation we worked with all extant community

Page 97

97
councils to help shape the engagement in their area.  This
extended in some areas to engagement with active Community
Development Trusts who have existing Community Action Plans or
are looking to develop Local Place Plans. 
3.7.2 Community Councils participated in public events including the
school programme, held special meetings to submit online
responses, or offered a one-on-one conversation with a
Development Plans Team Officer.  Where Community Councils
were unable to fully participate, they were often helpful in
suggesting engagement methods and opportunities, including
tying in with their own engagement or gala days.
3.7.3 All Community Councils in each Council Ward were provided with
detailed results in September 2024 and summary reports by
November 2024.  Feedback has also been provided through
presentations to Stronger Communities networking events.
3.7.4 Feeback received on behalf of Community Councils as part of our
Topic Papers consultation exercise has also been reviewed and
responded to, where relevant, as part of the analysis of individual
policy issues under Chapters 5 and 6, and Appendices A-E of this
Report.  How and where the Evidence Report has been amended,
considering that feedback, has also been recorded in these
sections. 
Ethnic Minorities
3.8.1 Invitations were extended to the variety of groups in Perth and
Kinross to participate, but with limited success.  A contributing
factor has been the amount of engagement which groups have
faced recently.  An event was held in Perth with 6 participants of
an English for Speakers of Other Languages (ESOL) group with
participants from a range of ethnic minorities.  However, Place
Standard exercises had been carried out by the Council’s
Equalities Team in 2021.  Where relevant this information has
been included in the Big Place Conversation summaries.  This
reached 39 people in ethnic minority groups people including local
South Asian, Chinese community members.

Page 98

98
4  Perth and Kinross LDP2 Monitoring
DELIVERY OF PERTH AND KINROSS LOCAL DEVELOPMENT PLAN 2
4.1.1 The Scottish Government’s LDP Guidance highlights that in
preparing their Evidence Report, planning authorities should
evaluate whether their previous local development plan has
delivered on its outcomes and allocations, and identify any
lessons which have been learnt for the preparation of the new
plan.  The Guidance also suggests that planning authorities may
wish to consider the appropriateness of their previous spatial
strategy.  However, it does makes clear that new proposals or site-
specific detail should not be included at the Evidence Report
stage.  
4.1.2 This section of our Proposed Evidence Report considers how
effective the implementation of our Perth and Kinross Local
Development Plan 2 (LDP2) has been since it was adopted in
November 2019, but concentrates on those matters suggested in
the Scottish Government’s May 2023 LDP Guidance.   
4.1.3 In considering the effectiveness of the Plan’s implementation, it is
important to note and be mindful of the introduction in 2023 of
the National Planning Policy suite through National Planning
Framework 4, and the revocation of our Strategic Development
Plan (SDP) – TAYplan2 through the 2019 Planning Act.  
4.1.4 In light of this, a separate evaluation of our LDP2 policies has been
carried out as part of the preparation of this Evidence Report, in
conjunction with our Development Management colleagues, to
identify which LDP2 policies have been superseded by NPF4,
where possible tensions exist between any of the national policies
and equivalent policies in LDP2, and whether there may be a need
for a local policy response to be developed through LDP3 to
address any local level detailed issues which are not currently
covered by NPF4.  An overview of the outcomes of this exercise
can be viewed in Appendix G to this Report.     
4.1.5 In respect of LDP2’s Spatial Strategy, the context for this was set
by TAYplan, and followed a tiered ‘Principal Settlement’ approach
to directing future sustainable development.  It also identified
long term Strategic Development Areas.   As that SDP was revoked
under the 2019 Act, and considering the introduction of NPF4’s
Spatial Principal to rebalance development to “create
opportunities for communities and investment in areas of past
decline”, namely rural areas which have experienced population
decline, and its new policy on Local Living and 20 Minute
Neighbourhoods, it is likely that whilst the principle of directing
future growth to the most sustainable locations i.e. Principal
Settlements, is still appropriate and relevant, the LDP2 Spatial
Strategy will need to evolve to incorporate the outcomes of our
work on identifying local living and 20 minute neighbourhoods
(including networks of)  in the context of Perth and Kinross, along

Page 99

99
with the review under the Rural Development issue of this
Evidence Report relating to NPF4 Policy 29’s Policy Outcome of a
balanced and sustainable rural population. 
Perth and Kinross LDP2 – Form and Content
4.2.1 The Adopted Perth and Kinross Local Development Plan 2 contains
a Vision, and a Spatial Strategy, which is divided into the 4
distinctive themes of – A Successful, Sustainable Place, A Low-
Carbon Place, A Natural, Resilient Place, and A Connected Place.  
4.2.2 The Plan’s Vision was that of the then adopted Strategic
Development Plan (TAYplan2, 2016-2036): 
“By 2036, the TAYplan area will be sustainable, more attractive,
competitive and vibrant without creating an unacceptable burden
on our planet.  The quality of life will make it a place of first choice
where more people choose to live, work, study and visit and
where businesses choose to invest and create jobs.”
4.2.3 Each Spatial Strategy Theme has its own more focused vision, a
set of key objectives, and a suite of associated policies.  Section 4
of LDP2 is the ‘Settlement Statements’ section, which provides a
map of each settlement within the Perth and Kinross Area, a
summary of the key characteristics of that settlement, and any
identified site proposals.  For any site proposals a table has been
provided setting out the relevant details for the development of
the site, including size, allocated land uses (employment,
residential, mixed uses etc.), and any site-specific developer
requirements.   
4.2.4 The section to follow sets out, for each of the Plan’s 4 themes, a
summary of how well the implementation of the Plan has
delivered against the identified objectives and allocations.  
Implementation of LDP2 Spatial Strategy Themes 
A Successful, Sustainable Place
4.3.1 The Plan identifies 7 Key Objectives under this first theme, these
objectives and a summary of how successful their implementation
has been to date, and where relevant any lessons learnt, are set out
below.  
1. Creation and continuation of high-quality places that meet
the needs of the existing and future communities.
In support of this objective, Policy 1 Placemaking and its
associated supplementary guidance (SG) have been well used
to aid decision making.  The Placemaking guide SG helps clarify
how to apply Policy 1 Placemaking, it provides guidance on an
appropriate design process (site appraisal, engagement, vision,
and implementation), guidance on applying the policy
principles, and provides technical guidance.  The Placemaking
guide provides clear explanations as to how to achieve high
quality development that responds to the unique setting of
Perth and Kinross.
The Council also prepared detailed site-specific guidance,
through the Thimblerow Development Brief (2021) to help

Page 100

100
guide a high-quality exemplar scheme demonstrating the
potential for city centre living in a low carbon development.
Design training with developers/agents, officers, and Elected
Members has been carried out to raise awareness and improve
application of the placemaking policy framework.  A
collaborative approach, together with this policy framework,
provides clear expectations for design, quality and place, taking
account of the local context, characteristics, and connectivity of
the area.  This approach helps deliver high quality places, and
in the Scottish Household Survey (2022) 95% of residents
ranked their neighbourhood as very or fairly good.
During the period from late November 2019 through to late
August 2024, Policy 1 was used a total 5,634 times in the
decision-making process for planning applications.  This
represents 97.8% of the overall planning applications
determined during that time, indicating its importance in the
decision making.  8.9% of those applications for which this
policy was applied were refused, with the related Report of
Handling citing that was part of or the reason for refusal was
due to the proposal being contrary to Policy 1 of LDP2. 
2. Support for local businesses to ensure economic growth in the
region.
The most recent Employment Land Audit (ELA) in 2022
identified there is a total of 292.72 Hectares (Ha) of
Employment Land, of which 44.98 Ha are Windfall Sites, and
247.74 Ha are allocated Employment land in the Local
Development Plan (LDP).  This is a healthy land supply in the
context of an average take up of employment sites in last 8
years of 2.1 Ha per annum.
To support this objective Policy 7 Employment and Mixed-Use
Areas has supported the safeguarding of existing employment
How successful has its implementation been?
It is considered that this objective has been met. The
Council’s Placemaking Guide is still very relevant, as it
was developed on the basis of the Scottish
Government’s six qualities of successful places (SPP
2014), which have been updated slightly to the
current set of qualities at Annex D of NPF4, with the
key elements and objectives remaining the same.  The
Guide’s continued use will help support the delivery
of the six qualities on the ground, but it is likely that it
will require a review and some minorupdates, as part
of our LDP3 development, to ensure the references
contained within it and the terminology used are in
line with NPF4, to allow its future use alongside LDP3.

Page 101

101
land and LDP2 has also allocated sites for economic
development.  There has also been support for the expansion
of existing businesses and creation of new ones in rural areas
through Policy 8: Rural Business and Diversification.
There have been 190 applications assessed against Policy 7
Employment and Mixed-Use Areas, and 175 have been
approved (92% approval rate).  This evidence highlights that
this policy has been supportive of a lot of employment related
development within these areas.
The tourism industry is a significant economic driver in Perth
and Kinross, and it has above average levels of employment in
accommodation and food services.  Through Policy 8: Rural
Business and Diversification, proposals for new tourism-related
developments, and the expansion of existing facilities, have
been supported where it can be demonstrated that they will
improve the quality of new or existing visitor facilities, allow a
new market to be exploited, or extend the tourism season. 
Policy 9: Caravan Site, Chalets and Timeshare Developments
provides further specific support for these uses where
proposals are an expansion of an existing facility, are replacing
static caravans, or meet a specific need.  Policy 8 has been used
461 times and there have been 408 approvals (88.5% approval
rate) and Policy 9 has been used 119 times, and there have
been 86 approvals (72.3% approval rate).  This evidence
highlights that that these policies have been supportive of a lot
of rural business and tourism development.
The Tay Cities Region Deal, signed in 2020, covers the areas of
north Fife, Angus, Dundee and Perth and Kinross and will see
an injection of an estimated £400m into the region over 15
years.  In Perth and Kinross, this includes 2 plant science
centre’s focusing on solutions for the food and drink industry
regarding climate change and the green recovery, at the James
Hutton Institute in Invergowrie.  The Deal will also fund Perth
Innovation Highway - a 5-mile smart technologies corridor
linking Perth Eco-Innovation Park at Perth West, a 25 Ha of
employment land and Perth City Centre.  Deal funding is also
provided for a low carbon transport and active travel
programme including the development of a low carbon
transport hub at Broxden Park and Ride in Perth.  This will help
make this core employment location more sustainable. 
Funding will also be provided for high-speed broadband access
in rural Perth and Kinross. 
Support is also being provided for a flagship plastics recycling
project at Binn Eco-Park as well as for engineering via Aviation
Academy and Tayside Engineering Partnership projects.  The
Cross Tay Link Road will provide new major road infrastructure
to support the growth of Perth and the future development of
employment areas.  The Deal’s investments also include a skills
and employability programme, supporting the region’s culture
and tourism offerings.
How successful has its implementation been?
It is considered that LDP2 has provided considerable
support for local businesses, whilst the Tay City Deal
has been significant in helping fund projects to ensure
economic growth, and this objective has been met.

Page 102

102
3. Provide an ongoing supply of readily available commercial/
industrial land of 25ha across Perth and Kinross.
At the time of the most recent ELA 2022, there was 36.94 Ha of
serviced employment land, and with limited take up in the
interim, this will not have changed significantly when the next
audit is prepared.
This objective has been assisted by allocation of employment
land in the Local Development Plan, and requirements for
strategic sites to service employment land alongside the
delivery of more profitable uses, largely housing.  However,
providing an ongoing supply largely relies on the Council
servicing sites for employment land, as the private market
would not ensure there is sufficient readily available
commercial/ industrial land. 
Whilst overall employment land supply is healthy, delivery is
not without challenges with the share of employment sites
owned by the Council being low.  The Council supplied Ryden
with its employment land assessment matrices for 41 LDP2
allocated sites.  Ryden provided a summary assessment
relating to these sites for the Perth Area, Strathearn, Kinross,
Highland, and Strathmore and the Glens.  The Council’s
employment land matrices utilise a ‘balanced scorecard’
approach to determine the sites most likely to require
intervention. This considers marketability, any evidence of
market failure, planning constraints, potential demand, and
consideration of the site against strategic priorities. 
This work considering LDP employment land allocations and
their relative priority for public sector intervention will help
inform the LDP review, help with delivery of LDP sites, and will
inform Perth and Kinross Council’s Investment Property
Strategy, its Commercial Land and Property Portfolio, and
Commercial Property Investment Programme.  It will also assist
in maintaining the Perth and Kinross Council Corporate Plan
key performance indicator for the area of immediately
available serviced business land to an appropriate level.
How successful has its implementation been?
This objective is not wholly within the control of LDP2,
but LDP2 has nevertheless helped support efforts to
meet it.  As there is sufficient supply of readily
available commercial/industrial land available, it is
considered that this objective has been met. 
However, the servicing of employment land has not
been defined in a consistent way, and a road being
provided up to edge of a larger area (which has been
delivered in some instances), rather than to individual
plots within, does not contribute to the serviced land
supply.  A definition for serviced employment land in
LDP3 would better assist with the delivery of serviced
employment land.

Page 103

103
4. Focus on retail and commercial development in accessible
centres that provide employment and services to residents
and visitors.
The existing LDP2 focuses retail, commercial, and other
significant footfall development through, Policy 10: City, Town
and Neighbourhood Centres, Policy 11: Perth City Centre
Secondary Uses Area, Policy 12: Commercial Centres and Retail
Controls, and 13: Retail and Commercial Leisure Proposals, and
through its spatial strategy and hierarchy of centres.  This has
supported the role of our centres, in these challenging times.
The Perth and Kinross City and Town Centre Retail Study (Core
Doc Ref: CD23) was updated in February 2023.  It provides the
evidence base to assist the Council with its work on the LDP
review.  The retail capacity forecasts for retail floorspace has
identified an overall over-supply of both convenience and
comparison goods in the Perth and Kinross Area covering the
Local Development Plan period from 2027 to 2037.  The
amount of surplus retail floorspace forecasted is particularly
acute in Perth City Centre, and this is additional to the centre’s
vacancies which, in floorspace terms, stand at around 14%
according to Experian Goad.  The evidence all points to a need
to move on from retail led city and town centres towards more
multi-purpose destinations in their offer, use and experience.
How successful has its implementation been?
Whilst LDP2 has largely met this objective, through its
retail and town centre policies, and hierarchy of
centres, NPF4 has updated the LDP2 retail policy
framework and helps strengthen the town centre first
principles for all significant footfall generating uses,
and the development plan/retail study led approach
to identifying and allocating for retail deficiencies.
Also, NPF4, through its local living policy clarifies the
importance of neighbourhood centres, and LDP3 will
need to update the neighbourhood centres and
identify these more comprehensively. LDP3 will likely
make some changes to better dovetail with and
support NPF4. 
NPF4 introduces a stricter approach to out of centre
retail to protect existing centres.  Out of 35
applications related to creating new retail space or
retaining or altering an element of existing retail
provision, 2 have been refused (approval rate of
94.3%).  However, there are significant retail
applications contrary to the Development Plan
currently under consideration, and this high rate of
approval may not be sustained going forward.  It is
noted that it is mainly larger retail planning
applications that are not in accordance with NPF4.

Page 104

104
5. Ensure provision of housing that is socially inclusive and
meets a wide range of needs.
In terms of the quantity of new housing which has been
delivered during the Plan Period, this is monitored annually in
the Council’s Housing Land Audit (HLA).  The housing land
requirement for LDP2 was set by the Strategic Development
Plan, TAYplan2, at an average of 1,000 units per year.  Whilst
shortfalls in housing land supply in some housing market areas
have been observed during the Plan Period, this has not been a
land allocation issue but rather the delivery of that land in the
short-medium term.
In relation to housing provision being socially inclusive and
meeting a wide range of needs, several policies have worked
together to seek to achieve this.  The Housing in the
Countryside policy has developed over several different Plans
and the most recent iteration, Policy 19 in LDP2, has actively
supported proposals for the erection or creation of single and
small groups of houses in the countryside which fall into at
least one of the six well established categories.
Policy 20: Affordable Housing is another long-established policy
which has sought an affordable housing contribution
amounting to an equivalent of 25% for sites of five or more
units over several Plan periods now.  Both Policy 20 and Policy
19 rely heavily on their detailed associated statutory
supplementary guidance for implementation.  The ‘Developer
Contributions and Affordable Housing Supplementary
Guidance’ was revised in December 2023.  This revision
reasserts the sequential approach to the provision of the
affordable housing contribution: on-site first then off-site with
commuted sums only being accepted in exceptional
circumstances.
Policy 21 sets the policy framework to assess new sites for
Gypsy/Travellers.  This has been supplemented by a
Gypsy/Traveller Site Standards Guidance Note following
discussion with residents on Council and private sites.  There
were no specific site allocations for new Gypsy/Travellers’ sites
in LDP2, although the settlement boundary of Greenacres
private site was drawn to allow for expansion.  Only a small
number of planning applications have been submitted relating
to Policy 21 during the lifetime of the Plan.  Most notably
permission was granted for replacement chalets on an existing
Gypsy / Travellers site, and permission refused for an extension
to another small existing Gypsy/Traveller site on health and
safety grounds.  Following the 2017 Tayside review of
accommodation needs, which identified the need for transit
provision, the Council completed a review of potential sites
informed by discussions with Gypsy/Travellers on traditional
use, safety and ownership.  This resulted in the commitment to
a 10-pitch site in Perth which is currently in pre-planning
stages.
Policy 22: Particular Needs Housing Accommodation has been
used in assessing planning applications since the adoption of
LDP2, and has helped facilitate the development of a
residential assisted living scheme for over 55s, a change in
house type to allow for a specialist need bungalow to be
provided on a larger scheme, assisted living units, and a 10-unit
House in Multiple Occupation (HMO) aimed at providing
student accommodation.
Policy 25: Housing Mix is a new policy which was added to
LDP2 to help secure a more appropriate mix of housing for
developments on sites with a total capacity of 20 or more
homes.  These proposals should meet the needs of smaller
households, including older people and lower income

Page 105

105
households, and address part of this need by providing at least
10% of their homes as one- or two-bedroom homes.
6. Promotion of a strong cultural character through arts,
cultural, community sport and recreational facilities offering
opportunities for social interaction and local identity.
To support this objective Policy 16: Social, Cultural and
Community Facilities has provided protection against loss of or
change of use of land or buildings presently or last used for
community purposes, whilst Policy 14: Open Space Retention
and Provision provides protection for existing open spaces
which have value to the community for either recreational or
amenity purposes, and also secures appropriate provision of
new open spaces within new developments.  NPF4 does not
currently address protection of open space for landscape/
amenity reasons, only referring to whether there is a green
infrastructure deficit.  Relying on NPF4 alone could mean many
of our current open spaces would have less policy protection.
7. Maintain the distinctiveness and diversity of the area through
the protection and enhancement of the natural and historic
environment.
To support this objective, policies 26: Scheduled Monuments
and Archaeology, 27: Listed Buildings, 28: Conservation Areas,
29 Gardens and Designed Landscapes, 30: Protection,
Promotion and Interpretation of Historic Battlefields, and 31
Other Historic Environment Assets have together provided a
suite of policies which have protected this full range of historic
environment assets.  Also, the allocation of sites for
development has directed development to appropriate
locations, and identified site specific developer requirements in
relation to the historic environment, which have also helped
protect the distinctiveness and diversity of the area. 
LDP2 largely contributes to this objective in a reactive sense,
seeking to protect existing assets, and support their
appropriate reuse where proposals come forward, but it
How successful has its implementation been?
The delivery of houses is largely outwith the Council’s
control, but the suite of policies within LDP2 have helped
ensure that where houses have been permitted, they
have met this objective.
How successful has its implementation been?
The LDP2 policies are currently meeting this objective,
whilst LDP3 will need to consider how it dovetails with
NPF4.  In particular, NPF4 Policy 31 emphasises the
importance of protecting and supporting our creative
sector, culture, heritage, and the arts which should be
reflected in the LDP3 Spatial Strategy, including
identifying those specific buildings/areas of land to be
protected/supported.

Page 106

106
cannot control the delivery of this objective in terms of
bringing forward proposals, and enhancements, and it is noted
that in February 2025, 105 buildings within the Perth and
Kinross Area were included on the Buildings at Risk Register for
Scotland.
The protection and enhancement of the natural environment is
covered under Theme 3: A Natural, Resilient Place, please refer
to this theme for more information.
A Low-Carbon Place
4.4.1 The Plan identifies 6 Key Objectives under this theme, these
objectives and a summary of how successful their implementation
has been to date, and where relevant, any lessons learnt, are set
out below.  
1. Improve the long-term resilience and robustness of the
natural and built environment to climate change.
This Key Objective was also repeated under the ‘A Natural,
Resilient Place’ Spatial Strategy, demonstrating the overarching
nature of these issues and the need to tackle the dual climate
and ecological crises together.  
Due to the interconnected nature of our planning policies and
the need to take a coordinated approach to addressing the
twin crises, there are several policies in LDP2, spread across all
4 Spatial Strategy themes, which seek to improve the resilience
and robustness of the natural and built environment of Perth
and Kinross against the effects of a changing climate and loss of
biodiversity.  
These policies include but are not limited to, Policy 1:
Placemaking and its associated supplementary guidance; Policy
3: Perth City; Policy 4: Perth City Transport and Active Travel;
Policy 6: Settlement Boundaries; Policy 8: Rural Business and
Diversification; Policy 10: City, Town and Neighbourhood
Centres; Policy 14: Open Space Retention and Provision;
policies 26 to 31 regarding historic assets and places; policies
32 and 33 relating to renewable, low and zero carbon energy
technologies; Policy 34: Sustainable Heating and Cooling; Policy
36: Waste Management Infrastructure; Policy 38: Environment
and Conservations (designations); Policy 39: Landscape; Policy
How successful has its implementation been?
As previously highlighted, although it is not wholly within
the control of LDP2, the Plan has nevertheless
contributed and supported efforts to meet this objective,
and whilst there are opportunities for improvement, it is
largely being met. 
The LDP3 Spatial Strategy should explore
interconnections between our historic environment with
other key policy connections to help maximise
opportunities for its protection, enhancement and
enjoyment.

Page 107

107
40: Forestry, Woodland and Trees and associated Forest and
Woodland Strategy; Policy 41: Biodiversity; Policy 42: Green
Infrastructure; Policy 44: Perth Lade Corridor; Policy 46: Loch
Leven Catchment Area; Policy 50: Prime Agricultural Land;
Policy 51: Soils; Policy 52: New Development and Flooding;
Policy 53: Water Environment and Drainage; Policy 56: Noise
Pollution; Policy 57: Air Quality; Policy 58: Contaminated and
Unstable Land; Policy 59: Digital Infrastructure, and Policy 60:
Transport Standards and Accessibility Requirements. 
Subject to site specific detailed consideration, LDP2 policies 32-
35 support development proposals in terms of mitigating
against the effects of climate change and promoting low
carbon actions.  These policies are further supported by key
Guidance on: Delivering Zero Waste, Placemaking, and
Renewable Energy.
LDP2 policy 59 supports development which makes provision
for digital infrastructure provided the environmental impacts
on the natural and built environment are minimised. This
provides opportunities to support local living and working,
potentially reducing the need to travel.  
LDP2 policy 60 promotes a shift to the more sustainable modes
of travel of walking, cycling and public transport giving people
travel choices that minimise the long-term impacts on our
climate. 
2. Ensure that development and land uses make a positive
contribution to helping to minimise the causes of climate
change and adapting to its impacts.
As per key objective 1 for this theme, subject to site specific
detailed consideration, LDP2 policies 32-35 support
development proposals in terms of mitigating against the
effects of climate change and promoting low carbon actions. 
These policies are further supported by key Guidance on:
Delivering Zero Waste, Placemaking, and Renewable Energy.
Out of 657 planning applications referring to Policy 52 New
Development and Flooding, 115 of those applications have
been refused.  This is a relatively substantial refusal rate of
17.5% which suggests that this policy is being applied
effectively, and applications contrary to this policy are largely
being refused.
How successful has its implementation been?
This objective is considered to have been met through
the suite of LDP2 policies and guidance which is enabling
the shift towards renewable and low carbon energy
technologies, whilst at the same time ensuring suitable
environmental protections are in place.

Page 108

108
3. Protect the natural and built environment and ensure that
new development embraces the principles of sustainable
design and construction, energy efficiency and heat
decarbonisation.
Relevant LDP policies inform development proposals to ensure
protection of the natural and built environment alongside key
Guidance including on: Delivering Zero Waste, Planning and
Biodiversity, International Sites (Loch Leven SPA, Dunkeld-
Blairgowrie Lochs SAC, and River Tay SAC), Placemaking, and
Renewable Energy. 
The Placemaking Guidance includes guidance that is used to
inform considerations of energy efficiency, passive design,
construction and materials, retrofitting sustainable design, and
recycling facilities and initiatives. 
The Renewables Draft Guidance also includes detailed
guidance on how to address key concerns around natural
heritage.
Policy 32 of the LDP2 also implements Section 3F of the Climate
Change (Scotland) Act in terms of requiring a proportion of
carbon emissions reductions to be delivered through low and
zero carbon generating technologies.
How successful has its implementation been?
To the extent that LDP2 has influence over new
development and land use, this objective is
considered to have been met. Wider land use
considerations e.g. agriculture, are considered further
under the Council’s Climate Change Strategy and
Action Plan.  
LDP3 will need to consider local living and the
concept of 20 minute neighbourhoods, alongside
climate change adaptation and mitigation measures,
using nature based solutions where possible – as per
NPF4 – to further support the creation of more
resilient and adaptable places, providing those
benefits of living locally, having access to facilities
and services, and reducing private car use. 
How successful has its implementation been?
This objective is considered to have been met.  LDP2
policies and guidance ensure that appropriate
consideration of impacts on the natural and built
environment are made, including any mitigation
measures necessary.  The principles of sustainable
design and construction, energy efficiency and heat
decarbonisation are being driven through suitable
planning proposals as well as wider legislative
proposals including Building Standards and Heat
Networks Zoning.
LDP3 will need to consider the opportunities for
decarbonising heat through alignment with the
Council’s LHEES, and opportunities from the Local
Area Energy Plan realised.

Page 109

109
4. Protect and enhance the character, diversity and special
qualities of the area’s landscape to ensure that new
development does not exceed the capacity of the landscape
in which it lies.
LDP2 Policy 39 has promoted the local values of the area’s
landscapes including safeguarding views from the impacts of
development, providing mitigation and enhancement and
protecting the experience of the night sky.  Local Landscape
Areas which were first identified in 2015, have continued to be
a primary consideration where potentially affected by both
built development and forestry applications, with mitigation
such as broadleaf planting and safeguarding recreational routes
and viewpoints.  
When responding to consultation requests for felling
permissions, long term forestry plans and woodland creation
proposals, the presence of Local Landscape Areas are routinely
highlighted, and application of the supplementary guidance
recommended to Scottish Forestry and private landowners and
land managers. 
NPF4 does not contain a specific landscape policy for non-
designated landscapes, and there has been significant
additional pressure because of the qualification in NPF4 Policy
11 regarding the significant impacts of renewable energy,
which may see a degradation of our valued landscapes.  While
work is ongoing on designating Local Geodiversity Sites,
candidate sites are available to planners which has allowed
applications and particularly in the context of forestry
consultations to ensure adverse impacts are avoided.  The
survey information on quarry and mining sites is also being
used to inform restoration proposals.
Policy 43 is a restrictive policy which has limited development
in the designated Green Belt area to those outlined in previous
national and regional level plans and policies.  All proposals
have also had to comply with the overall objective of the Green
Belt to protect and enhance the character, landscape setting
and identity of settlements.
Policy 33 gives support to proposals for the utilisation,
distribution and development of renewable and low carbon
sources of energy subject to site specific detailed
consideration.  All proposals have been required to take
account of individual or cumulative effects on landscape
character, Local Landscape Areas, Wild Land Areas and
National Scenic Areas.

Page 110

110
5. Conserve and enhance habitats and species of international,
national and local importance.
This Key Objective is also repeated under the ‘A Natural,
Resilient Place’ theme. 
Potential impacts on European Protected Species, priority
species and habitats are required to be identified through the
Council’s Planning for Nature Guidance.  
This includes the requirement for Habitat Regulations Appraisal
where a European Site is potentially affected.  Internationally
recognised habitats, namely the Tay Special Area of
Conservation (SAC), Lunan Lochs and Loch Leven catchment
areas, have received particular protection in applications
including enhancement through additional phosphorus
mitigation in the Loch catchments. 
Through Planning for Nature, the requirement for
enhancement for Tayside Local Biodiversity Action Plan (LBAP)
species has been promoted with Swift, House Martin and Barn
Owl nest resources, hedgehog highways, bat roosts and
mitigation for amphibian dispersal becoming standard.  
The introduction of NPF4 has seen a greater awareness of
biodiversity measurement with significant uplift in biodiversity
on some sites.  In 2024 (to August) 92% of developments
(excluding householders) will deliver enhancement - the
remainder due to a lack of opportunities on site, and 12%
provided a site biodiversity action plan.  There is still room to
improve practice with 6% of applications not mentioning
biodiversity.  NPF4 precludes a requirement for householder
development enhancement measures, which in 2024 could
have delivered biodiversity enhancement on 35 homes with a
potential 70 nesting/roosting resources.
Local Biodiversity Sites have been identified in candidate form
and are used to inform applications particularly when we are
consulted on forestry applications.  While threats from forestry
How successful has its implementation been?
This objective is considered to have been met in the
context of LDP2 policy and guidance, which provide
protection for important landscapes, including
nationally and locally designated areas. 
The expectations around landscape impacts from
renewable energy developments have shifted
through NPF4 Policy 11 with significant localised
effects to be expected. Careful project design and
mitigation will be key to minimising significant
landscape impacts arising as a result of renewable
energy developments. 
Supplementary Guidance to support LDP Policy 39
(Landscape) is an important guide in considering
impacts from these types of developments and
forestry related developments on local landscape
areas.

Page 111

111
still occur, control over development has ensured that these
candidate sites are not adversely affected.
6. Promote the sustainable development of electricity
generation from a diverse range of renewable and low-carbon
energy technologies, including the expansion/repowering of
renewable and low-carbon energy generation capacity and
heat networks, in accordance with national objectives and
targets.
Proposals for new and repowered/expanded energy generation
are supported by Policy 33 subject to detailed assessment
against relevant policy criteria.  Draft Guidance on Renewable
Energy has been prepared and will be updated in 2025 to
reflect updated national planning policy framework.
NPF4 has significantly updated the planning policy framework
in support for renewable energy generation, through Policy 11:
Energy, Heating and Cooling.  Significant weight – through
NPF4 Policy 11e – is placed on the contribution of the proposal
to renewable energy generation targets and greenhouse gas
emissions reduction targets.  This is further supported by NPF4
Policy 1: Tackling the Climate and Nature Crises, which gives
significant weight to the global climate and nature crises.
The uptake of heat network development has been limited
since the adoption of LDP2.  Key strategic sites have considered
the viability of heat network deployment, and proposals for
future safeguarding have been incorporated into long-term
plans, where applicable.  Future for decarbonising heat,
including identifying heat network zones, will be driven by the
Council’s Local Heat and Energy Efficiency Strategy (LHEES)
which was adopted in 2024.  This will align with NPF4 Policy 19
(Heat and Cooling), where the LHEES is expected to drive
localised heat decarbonisation.
How successful has its implementation been?
This objective is met as a priority.  Improvement has
been made in the quality of applications received,
although despite NPF4 and PKC guidance there are still
applications being submitted without baseline
environmental information, enhancement proposals or
further surveys that had been identified in ecological
reports which may require policy in LDP3 to address this. 
In 2024, 36% of applications contained insufficient
information on biodiversity on receipt requiring further
information to be requested or carried out.
How successful has its implementation been?
This objective is considered to have been partially met in
the context of supporting renewable energy proposals
subject to suitable environmental and amenity
considerations, whilst heat networks will be further
considered under the newly published LHEES and
emerging national plans and policy around heat network
zoning.

Page 112

112
A Natural, Resilient Place
4.5.1 The Plan identifies 5 Key Objectives under this theme, some of
which have been repeated under other LDP2 Spatial Strategy
themes.  These objectives and a summary of how successful their
implementation has been to date, and any lessons learnt, where
relevant, are set out below.  
1. Conserve and enhance habitats and species of international,
national and local importance.
This Key Objective is repeated in the ‘A Low-Carbon Place’
theme (refer to Key Objective 5).  The evaluation provided
under that theme is applicable to this theme also.  
2. Identify and promote green networks where these will add
value to active travel, the provision, protection and
enhancement and connectivity of habitats, recreational land,
and landscapes in and around settlements.
Green infrastructure and Planning for Nature guidance has
promoted consideration of connectivity of habitats and
enhancement of opportunities to promote greening of active
travel routes within control of the developer.  Indicative
landscaping in Development Plan allocations has helped
promote delivery of green networks and enhancement of
habitat.  LDP2 Policy 14 has helped to protect existing
designated open spaces from inappropriate development.
3. Improve the long-term resilience and robustness of the
natural and built environment to climate change.
LDP2 Policy 51: Soils has minimised development on carbon
rich soils, peatland and priority peatland habitat to several
limited exceptions, as well as ensuring peatland management
plans are secured through condition(s) to promote best
practice for the handling, storing and reinstatement of any
How successful has its implementation been?
This objective is met as a priority.  Improvement has
been made in the quality of applications received,
although despite NPF4 and PKC guidance there are still
applications being submitted without baseline
environmental information, enhancement proposals or
further surveys that had been identified in ecological
reports which may require policy in LDP3 to address this. 
In 2024, 36% of applications contained insufficient
information on biodiversity on receipt requiring further
information to be requested or carried out.
How successful has its implementation been?
This objective is considered to have been met in the
context of LDP2 policy and guidance.  In line with NPF4,
LDP3 will look to identify opportunities for new and
enhanced blue and green networks which provide
multiple benefits for people and nature across Perth and
Kinross.

Page 113

113
carbon rich/peaty soils.  Where developments impact on soils
more generally, planning conditions have been secured for soil
management plans to ensure good soil management
throughout the development process including during
construction and as part of reinstatement.   Where Policy 51 is
referenced, the approval rate is 84%.
LDP2 Policy 50: Prime Agricultural Land protects this key
natural resource from being lost to inappropriate development. 
Where Policy 50 has been referenced in relation to applications
for development, the approval rate is 80%. 
LDP2 Policy 53C: Surface Water Drainage has secured proposals
for new development which avoid pollution and attenuate
flows to greenfield run-off levels.  Policy 53C also promotes
natural solutions, encouraging them to achieve multiple
benefits, and in terms of flood risk and flood risk assessment,
and open space provision for new developments,
supplementary guidance documents provide detailed guidance
on the design process, how to consider drainage from the
outset, as well as providing design guidelines for natural SuDS
features.  
Securing integrated natural green and blue network SuDS
solutions has been fairly successful on larger strategic sites
where land take is less of a concern.  However, most
development proposals still favour engineering solutions, and
where proposals meet greenfield run-off levels it is difficult to
secure improvements for multi-benefit solutions.  The need for
more detailed guidance on SuDs/maintenance standards has
been identified in the current review of the Roads
Development Guidance. 
The protection of Local Biodiversity Sites continues to provide
genetic reservoirs.
4. Ensure that development and land uses make a positive
contribution to helping minimise the causes of climate change
and adapting to its impacts.
The Council’s Planning for Nature Guidance introduced a
requirement for the compensation of tree loss on a 1:3 basis,
providing a disincentive for tree loss and a greater uptake of
carbon from replacements.  The guidance also requires that
surveys are undertaken prior to development to ensure that
interventions do not adversely impact on woodland or
peatland habitats.  
Until the introduction of NPF4, Policy 32 of the Adopted LDP2
required 10% of carbon emissions to be met through low and
zero-carbon generating technologies. 
How successful has its implementation been?
This objective is considered to have been met in the
context of LDP2 policy and guidance, although, it could
be extended to include the protection of prime
agricultural land as a key asset for ensuring good
quality soils for growing a wide range of crops. 
In line with NPF4, greater weight will be given in
decision making, including the development of LDP3’s
Spatial Strategy to tackling the climate and nature
crises, including the identification of mitigation and
adaptation measures to improve the resilience of our
places to the effects of a changing climate.

Page 114

114
LDP2 Policy 51 has minimised development on carbon rich
soils, peatland and priority peatland habitat to several limited
exceptions, as well as ensuring peatland management plans are
secured through condition(s) to promote best practice for the
handling, storing and reinstatement of any carbon rich/peaty
soils.  Peatland restoration proposals have also been secured
through condition for a range of developments, primarily in
upland areas.
5. Protect and enhance the character, diversity and special
qualities of the area’s landscape to ensure that new
development does not exceed the capacity of the landscape
in which it lies.
This Key Objective has also been repeated under the ‘A Low-
Carbon Place’ theme of LDP2 (Key Objective 4).  The evaluation
provided under that theme is applicable to this theme also.  
How successful has its implementation been?
This objective is considered to have been met.  Action as a
result of the implementation of these policies has helped
minimise the effects of climate change on the Perth and
Kinross Area.
How successful has its implementation been?
This objective is considered to have been met in the
context of LDP2 policy and guidance, which provide
protection for important landscapes, including
nationally and locally designated areas. 
The expectations around landscape impacts from
renewable energy developments have shifted
through NPF4 Policy 11 with significant localised
effects to be expected. Careful project design and
mitigation will be key to minimising significant
landscape impacts arising as a result of renewable
energy developments. 
Supplementary Guidance to support LDP Policy 39
(Landscape) is an important guide in considering
impacts from these types of developments and
forestry related developments on local landscape
areas.

Page 115

115
A Connected Place
4.6.1 The Plan identifies 4 Key Objectives under this theme.  These
objectives and a summary of how successful their implementation
has been to date, and where relevant, any lessons learnt, are set
out below.  
1. Identify and provide for new and improved social and physical
infrastructure to support an expanding and changing
population.
The period of this Local Development Plan has seen changes to
the size and composition of the population of the Plan Area.
Two major trends that have been identified are that the
population has grown, and the proportion of older people
continues to increase.
One of the main functions of a plan-led system is to consider
the infrastructure needs of the Plan’s policies and proposals
and to plan for its provision as and when it is needed. 
Improvements to social and physical infrastructure identified in
the Plan have therefore been set out in two ways:
Firstly, each of the Plan’s proposals sets out the scale of
development expected on each site and specifies what
developers have been required to do when designing and
delivering development, emphasising improvements to
infrastructure in a list of site-specific developer requirements. 
Secondly, where the cumulative impact of new developments
will exacerbate or generate a future need for additional
infrastructure provision or community facilities, contributions
have been sought through two of the Plan’s policies.  Policy 5:
Infrastructure Contributions sets out where contributions have
been sought towards primary education, transport
infrastructure, and offers scope to include other requirements
on a case-by-case basis.  Policy 20: Affordable Housing sets out
the Council’s requirements for the provision of affordable
housing.  The Developer Contributions and Affordable Housing
Supplementary Guidance was regularly reviewed to ensure that
the Plan’s Proposals were delivering against this objective.
2. Establish clear priorities to ensure stakeholders and agencies
work in partnership so that investment is co-ordinated, and
best use is made of limited resources to enable the delivery of
the strategy, supporting the aims and objectives of the
Strategic Transport Projects Review, the Regional Transport
Strategy, and the Tay Cities Deal.
How successful has its implementation been?
This objective is considered to have been met. The Local
Development Plan proposals and policies (including
associated Supplementary Guidance) ensure that
appropriate consideration has been given to the
provision of social and physical infrastructure necessary
to support the level of development proposed in the
Plan.  The cumulative impact of development is also
addressed.
LDP3 will need to consider the NPF4 infrastructure first
approach and regular reviews of the contributions
guidance.

Page 116

116
The Local Development Plan Delivery Programme monitors
overall delivery of the Plan’s policies and proposals, and it
includes a section identifying the strategic actions and
infrastructure developments required to implement the Plan.
The Delivery Programme includes a table of the strategic,
national and regional actions required, along with a description
of the lead partners and progress notes.
Examples of projects that have progressed well include Shaping
Perth’s Transport Future, and improvements to national and
regional rail corridors and infrastructure. There has been mixed
progress with A9 trunk road improvements.
3. Ensure investment in the renewal and enhancement of
existing infrastructure is consistent with the strategy of the
Plan to make best use of the investment embedded in our
existing settlements.
The Plan’s Strategy for this theme aimed to make Perth and
Kinross one of the best-connected areas in Scotland.  The Plan
sought to make the settlements across Perth and Kinross better
connected to transport links, and to ensure that connections
are made across a wider region.  A framework of projects was
identified in the Plan (Strategy Map 5) showing important
existing infrastructure and planned infrastructure investment.
Proposals for park and rides, trunk road improvements and
new/improved railway stations were identified in the Plan.
These were supported by Policy 60A: Existing Infrastructure
and aligned with the Plan’s wider strategy.
How successful has its implementation been?
This objective is considered to have been partially met.
There has been progress with some, but not all of the
projects and policies of strategic, national and regional
importance listed in the Delivery Programme. These will
be further considered in the preparation of LDP3.
How successful has its implementation been?
This objective is considered to have been partially met.
There has been progress with some of the
improvements to existing infrastructure including
selected park and rides, but less progress with A9
junction improvements around Perth, and A9 dualling.
Improvements to infrastructure have been made at
Perth Railway Station. 
The LDP3 Spatial Strategy should consider how to work
better with infrastructure providers, stakeholders and
agencies to maintain investment in the renewal and
enhancement of existing infrastructure.

Page 117

117
4. Provide a flexible policy framework to respond to changing
economic circumstances and developing technology.
The provision of digital infrastructure is vital to the economy, it
supports local living, increases opportunities, and potentially it
also reduces the need to travel.  It is therefore important that
the Plan is flexible enough to support efforts to deploy new
technologies and remove redundant equipment.  The LDP2
Policy 59: Digital Infrastructure required developers to make
provision for digital infrastructure in all new-built
developments.
How successful has its implementation been?
To the extent that LDP2 has had influence over
changing economic circumstances and developing
technologies, this objective is considered to have been
met.  The policy framework for developing technology
has been suitably flexible, although it is acknowledged
that proposals for the majority of digital
communications infrastructure has not needed to be
considered against the policy criteria.
Over the Plan Period, Building Standards overtook this
policy in terms of the requirement to make provision
for digital infrastructure in new developments.
LDP3 will need to consider whether the remaining
provisions of this policy will still be required moving
forward, since NPF4 Policy 24 Digital infrastructure has
updated the planning policy framework.

Page 118

118
Implementation of LDP2 Housing Land Allocations 
4.7.1 An assessment of the performance of LDP2 housing allocations
in meeting the identified housing land requirement for the
Perth and Kinross Council (PKC) Area is set out in the 2022
Housing Land Audit and summarised below.
4.7.2 This assessment was not undertaken in the 2023 Audit as by
then NPF4 had been published setting a new Minimum All-
Tenure Housing Land Requirement.  The Homes issue under
Chapter 5 and Appendix C of this Report compares need against
supply for the purposes of setting an indicative Local Housing
Land Requirement in the Evidence Report.  It should be noted
that there is no longer a requirement to assess this at Housing
Market Area level.
Meeting the Housing Land Requirement (2022)
4.7.3 In 2022 the Council was required to identify a specified amount
of land for housing in each of its housing market areas.  Until
2022 this ‘housing land requirement’ (HLR) was set by the
TAYplan2 Strategic Development Plan.  The total housing land
requirement for Perth and Kinross from the base date of 2016
to 2029 was 13,000 units.  Table 1 in LDP2 set out the housing
land requirement and supply position at Plan adoption stage
and this was updated to reflect the position in 2022.  This has
been updated in Table 20 to follow. 
4.7.4 In the 3 years prior to 2022 there were significant challenges
because of Brexit, the global Covid-19 pandemic, and a further
economic downturn as the country entered a cost-of-living
crisis.  The question remained as to what the longer-term
implications of these would be on the ability of developers to
open new sites or continue with phases of larger sites.  It was
considered appropriate therefore, due to the high level of on-
going uncertainty, to continue the cautious approach taken
since the 2020 Audit and this meant that the programming for
some sites was pushed back to later years.
4.7.5 As a result, there continued to be shortfalls in 4 of the 6housing
market areas, and an overall shortfall across Perth and Kinross. 
The housing land requirement set out in TAYplan2, however,
was not an annual requirement but rather is one which was to
be met over a longer timeframe which extended up to and
beyond the current Plan Period.  Ultimately the issue was not
one of land allocation but in the delivery of that land in the
short-medium term.

Page 119

119
Maintaining and Effective Housing Land Supply (2022)
4.7.6 At 2022, the Council was required to, by the then Scottish
Planning Policy, to maintain at least 5 years effective housing
land supply (HLS).  The effective HLS was that part of the total
supply of land for housing which was free or expected to be
free of development constraints and would therefore be
available for the construction of housing in the next 5 years.
4.7.7 A table (see Table 21 to follow) considered the 5-year effective
supply against the 5-year housing supply target for each of the
housing market areas in Perth and Kinross at 2022.  The
calculation method reflected that in the annual Planning
Performance Frameworks: 
= (     
     ) x 5
4.7.8 Shortfalls had emerged in maintaining a 5-year effective
housing land supply in all housing market areas with the
exception of the Kinross area.  There was also an overall
shortfall at Perth and Kinross level.
4.7.9 LDP2 Policy 24: Maintaining an Effective Housing Land Supply
set out the steps which would be taken in the event of shortfalls
being identified. The first and foremost of these was that the
Council would seek to work with landowners / developers to
bring forward sites, including those identified as longer-term
expansions.  It was noted that, given the issue was not one of
overall land supply, but rather the short-medium term delivery
of that supply, the Council would continue to seek to work with
landowners and developers through the Delivery Strategy
process under Policy 23: Delivery of Development Sites to help
to identify the scope for the programming of longer-term and
stalled sites to be brought forward to help address the
shortfalls.

Page 120

120
Table 20: Update to LDP2 Table 1: Housing Land Requirements (HLR) and Supply by Housing Market Area
Housing Market Area Greater
Dundee
Strathmore
and Glens
Highland
Perthshire
Kinross Strathearn Greater Perth PKC total
HLR 2016-2029 78 1,859 995 983 1,846 7,239 13,000
Compleons to 2022 40 438 245 576 645 2,163 4,107
Effecve supply 2022-2029 60 886 405 486 802 3,332 5,971
Windfall assumpon 0 100 60 59 99 378 696
Small site allowance for Highlands 89 89
Surplus / shorall 22 -435 -196 138 -300 -1,366 -2,137
Table 21: Perth and Kinross Effective 5 Year Supply Vs 5 Year Housing Supply Target (2022)
Housing Market Area Greater
Dundee
Strathmore
and Glens
Highland
Perthshire
Kinross Strathearn Greater Perth PKC total
5-year effecve supply 20 568 266 382 571 2,195 4,002
5-year supply target 25 605 360 355 600 2,285 4,230
Supply (in years) 4.0 4.7 3.7 5.4 4.8 4.8 4.7

Page 121

121
Implementation of LDP2 Employment Land Allocations 
4.8.1 There is currently a generous 292.72 Hectares (Ha) of marketable
land in the 2022 Employment Land Audit (ELA), which will not
significantly change when we update our ELA (programmed for
late Spring 2025).  This generosity is suggested by the historically
limited progress on the LDP2 employment use allocations and
take up more generally for employment uses (Class 4 Office, Class
5 Industrial, and Class 6 Storage and Distribution).  There is an 8-
year average take up (development of Class 4, 5 and 6 uses) of 2.1
Ha per year. 
4.8.2 This suggests there is a very healthy employment land supply in
LDP2.  However, take up may have been affected by limited
serviced sites, and early review work for LDP3 suggests a potential
minimum total of 100 Ha of effective employment land could be
an appropriate minimum employment land requirement for LDP3.
4.8.3 Although the overall employment land supply is healthy, delivery
is not without challenges with the share of employment sites
owned by the Council being low.  Where development viability is
weak or marginal, even small constraints to development of land
such as survey costs and risks, minor works, landscaping/ parking/
paths, or plot servicing can become absolute constraints to
occupiers or developers making their investment.  The Perth and
Kinross Council Employment Land and Property Market Analysis
(December 2022) (Core Doc Ref: CD024) identifies that the
majority of allocated employment land supply is constrained and
unlikely to be developed in the short-medium term without any
public sector intervention.
4.8.4 Whilst most of the solution will not be within planning controls,
there is a role for the LDP3.  It may need to consider further
opportunities for mixed-use allocations where appropriate and
ensure there is appropriate cross funding between housing and
employment uses.  This approach would also support the Local
Living and 20 Minute Neighbourhood policy.  Also to ensure cross
funded serviced sites are “oven ready” consideration should also
be given to defining serviced employment land in LDP3 so that
there is a consistency in the quality of the cross funded
employment land delivered.
4.8.5 LDP2 includes the categorisation of two types of employment land
- core and general, with a different policy approach associated to
them both, providing greater flexibility on acceptable uses for the
general employment land, and less flexibility for the core.  If the
LDP3 continues this approach, there will need to be a
reassessment of their allocation, as either core or general areas, in
terms of existing function and character, and with consideration
to vacancy rates.

Page 122

122
5  Evidence Gathering - Information on Issues
APPROACH TAKEN TO THE COLLATION OF EVIDENCE
5.1.1 In preparing our Evidence Report, the Council has taken an issue-
based approach, which for the most part follows the list of policy
topics contained in Part 2: National Planning Policy, of National
Planning Framework 4 (NPF4). 
5.1.2 Where considered relevant, some of the NPF4 policy topics have
been grouped together for evidence gathering and evaluation
purposes, due to the overlapping or inter-connected nature of the
issues or topics, and to save duplication of effort in the collation
of the data and information where there are the same
requirements across similar or connection issues. 
5.1.3 In advance of preparing our Evidence Report we produced a series
of Topic Papers which set out the key information and evidence
about the Plan Area and range of policy topics, which we propose
to use to develop our new Local Development Plan 3.  Our Topic
Papers were then consulted on for a period of 6 weeks and we
have used the feedback received through that consultation and
engagement process to inform the individual issue templates
under this section and in Appendices A-E of this report.   A more
detailed reflection on the format and outcomes of our
participation and engagement programme to help inform the
development of this Evidence Report has been provided under
Chapter 3. 
5.1.4 In presenting information on each of our 30 issues we have
followed the suggested template at Figure 7, page 33 of the
Scottish Government’s LDP Guidance.  This is to ensure that the
relevant requirements are covered in a consistent manner for
each individual issue.  
5.1.5 The issues for which a summary of evidence has been provided
(and reported in detail under Appendices A-E), have, for ease of
reference been grouped following NPF4’s 3 themes – Sustainable
Places; Liveable Places, and Productive Places and an overview
provided in the pages to follow.  However, there are also separate
Homes, and Infrastructure and Transportation groups due to the
significance of these issues to the development of the Proposed
Plan, and the breadth of information which they cover.  These
issues follow on directly from the Liveable Places theme group
summaries, and before the Productive Places group.    
5.1.6 It is also worth noting that the Infrastructure and Transportation
issue has many different elements, therefore this section has then
been further divided under the subheadings of – Cemetery
Provision; Communications and Digital; Education Facilities;
Healthcare; Transportation (including Sustainable Transport), and
Wastewater Treatment and Water Supply.  
FORMAT OF CHAPTER 5
5.1.7 Prior to the overview of the summaries for each of the 30 issues, a
round-up summary of the overall gaps, uncertainties and key

Page 123

123
issues relating to the evidence reviewed for LDP3, and a table of
disputes to the Evidence Report, alongside a Position Statement,
have first been provided to highlight those key elements of this
Report. 
5.1.8 Following on from this, as referred to in paragraph 5.1.5, an
overview of the summaries for each issue has been provided
under the 5 relevant themes.

Page 124

124
GAPS,UNCERTAINTIES, AND KEY ISSUES RAISED

Page 125

125
TABLE OF GAPS,UNCERTAINTIES AND KEY ISSUES RAISED IN EVIDENCE
Evidence Report Issue Gaps, Uncertainties and any Key Issues raised in Evidence
Sustainable Places
Issue 001: Tackling the
Climate and Nature
Crises
 Full suite of data sources unavailable for some of PKC Climate Change Strategy and Action Plan Key Performance
Indicators.
 Presumption taken that Perth and Kinross would follow Scottish trends between 1990 and 2005 for greenhouse gas or
CO2 emissions to set 2030 emissions targets, due to the Scottish Government not having released the Perth and Kinross
1990 baseline for both. 
 Perth and Kinross Carbon Sequestration Study notes some uncertainty in defining peatland, its status and lack of robust
data to allow monitoring of restoration sites, making estimated timescales for restoration inappropriate at present.
 Perth and Kinross Carbon Sequestration Study, in terms of woodland expansion potential, the project report identifies
significantly higher levels of carbon sequestration potential from the planting of Production Sitka Spruce, and lower
from the expansion of Native Broadleaf (after 25 years).  It is important to remember the national objective of
expanding native woodlands, and policy of planting the right tree in the right place.  As such, it is most likely that a
mixed approach to planting will be the most appropriate one.  This will be explored further via the Council’s Forestry
and Woodland Strategy review.
 Currently no data available in relation to technological sinks and stores suggested for inclusion under the Scottish
Government Local Development Plan Guidance, May 2023.
 Data in Scotland Wetland Inventory has been developed by assimilating spatial data from Scottish Natural Heritage
(now Nature Scot).  The whole country has not been surveyed, and the data only displays known wetlands. 
Issue 002: Biodiversity
and Natural Places
(including Landscapes)
 General experience of landscape is not covered by the data sources reviewed as part of this Evidence Report issue. 
NPF4 does not contain a policy on landscape, but our communities have a strong relationship with their surrounding
landscapes, and there is potential for impacts on landscapes around local and regional significance as a result of
development, including energy related proposals.  The importance of continuing a local landscape policy along the lines
of Policy 39 of LDP2 will need to be explored with communities during the Proposed Plan preparation. Currently no
policy covering Geological Conservation Review sites.
 Many of the assessments for protected areas are out of date, not all protected areas are still of the quality of the last
assessment, or the qualifying features may no longer be relevant, or valuable features may be present.

Page 126

126
Evidence Report Issue Gaps, Uncertainties and any Key Issues raised in Evidence
 The Loch Leven source apportionment study was due to be refreshed in 2025 but subject to funding will now be carried
out in 2026 with results due April 2026. The final report may not be available to fully inform the LDP3 preparation
stage.
 Protected species information and trends at a national level are not collated at a local authority level, furthermore
there is no records centre for Perth and Kinross.
 A review of the Tayside Biodiversity Partnership Local Biodiversity Action Plan (LBAP) is currently underway and will
coincide with the development of the Proposed Plan.  The Council will work closely with the partnership to ensure the
Proposed Plan and Nature Networks are complementary to the ambitions of the LBAP review. 
 Local Biodiversity Sites programme will not be complete until mid-2026.  Whilst sites will be adopted in time for the
Proposed Plan consultation to allow the work to be incorporated, this may impact the early development of Nature
Networks. 
 Nature Networks are a new feature with tools still in development.  Several potential opportunities and constraints are
identified in the sources reviewed for this issue in Appendix A. Engagement has taken place to identify additional
nature rich sites, restoration projects, local priorities and opportunities. Following draft nature network mapping
further engagement will be carried out in 2026 to ensure best value is delivered from the final nature network that is
delivered as part of LDP3.  This will involve partnership working between the Council and Perth and Kinross
Countryside Trust, through their Perthshire Nature Connections Partnership, and will be developed alongside green
infrastructure and green network identification. 
 A lack of biodiversity metric hinders the development of an approach to ensuring development complies with the
mitigation hierarchy and provides the expected compensation and enhancement. 
Issue 003: Soils  Site surveys needed to support the detailed consideration of carbon rich soils, peatland, priority peatland habitats, and
prime agricultural land. 
 No nationally consistent methodology for identifying land of lesser quality that is culturally or locally important for
primary use.  
Issue 004: Forestry,
Woodland and Trees
 No single dataset provides a comprehensive overview of all trees and woodland of high biodiversity value within Perth
and Kinross, and smaller scale woodlands, tree belts and hedgerows may be omitted from those datasets which in
combination provide the best available information.  
 The National Forest Inventory (NFI) does not cover smaller areas of woodland, tree belts and hedgerows if they are less
than 0.5 Ha, their canopy is under 20%, and they do not meet a minimum width of 20 metres.  Where relevant, these

Page 127

127
Evidence Report Issue Gaps, Uncertainties and any Key Issues raised in Evidence
assets should be picked up via other location specific studies, such as our Locality Profile work, the assessment of
individual site proposals, and work relating to the identification of habitat and nature networks. 
 The Ancient Woodland Inventory (AWI) is not definitive and should be used with care.  Nature Scot advise that when
evaluating woods it is important to - examine the site on the ground, looking for archaeological, biological and other
indicators of antiquity and of its current biodiversity value; examine old maps (woods not shown on the AWI, but
present on the historic maps, are likely to be ancient and should be treated as such unless evidence is available to the
contrary), and to seek specialist advice if in doubt.  It is proposed that we will follow these additional steps in
identifying ancient woodland within the Perth and Kinross Area as part of our LDP3 Spatial Strategy and the review of
our Forest and Woodland Strategy.   yThe Ancient Tree Inventory (ATI) data is often supplied by members of the public
but is verified by local recorders, as such although it is publicly available, it needs enhancement via citizen engagement. 
Engagement will be carried out as part of the development of our Proposed Plan and revised Forest and Woodland
Strategy, and we will seek further information from the public and key stakeholders in respect of ancient trees
identified on the ATI. The Tree Preservation Orders identified in the Council’s Interactive Heritage Map require a review
to ensure the records remain up-to-date and relevant.  This will be prioritised as part of the development of our
Proposed Plan.  Whilst for the most part still relevant, the Council’s Forestry and Woodland Strategy (FWS) requires a
review to ensure that it is fully aligned with the National Strategy and meets the expectations and requirements of
National Planning Framework 4.   This review is currently underway and a consultative draft FWS is expected to be
published for comments in May 2026.As per the Tackling the Climate and Biodiversity Crises issue, the James Hutton
Institute Carbon Sequestration Study for Perth and Kinross, in terms of woodland expansion potential, the project
report identifies significantly higher levels of carbon sequestration potential from the planting of Production Sitka
Spruce, and lower from the expansion of Native Broadleaf (after 25 years).  It is important to remember the national
objective of expanding native woodlands, and policy of planting the right tree in the right place.  As such, it is most
likely that a mixed approach to planting will be the most appropriate one.  The project report also includes limited data
on species resilience to the effects of a changing climate.  It is proposed that we explore with Forestry Scotland and
Forest Research the information they hold regarding species resilience to address this gap in the JHI Study.     
Issue 005: Historic Assets
and Places
 Historic Environment Scotland’s Historic Land Use Assessment is not available for the entire Perth and Kinross Council
Area.  However, it does provide a picture for the most populated areas. 
 A rolling programme is in place to review our Conservation Areas and the list of Conservation Area Appraisals.  Our approach to
this will be to group areas by location; to prioritise areas where the last appraisal or review was some considerable time ago; and
to provide an appraisal where none is currently in place. The first three reviews (Birnam, Dunkeld, and Spittalfield) are to be
considered by Economy and Infrastructure Committee on 28 January 2026. The next Conservation Area Appraisal to being

Page 128

128
Evidence Report Issue Gaps, Uncertainties and any Key Issues raised in Evidence
reviewed will be Perth Central and to be considered by Economy and Infrastructure Committee at the end of 2026. Due to the
period which has lapsed since Perth and Kinross Design Charettes were produced, any data or statistics contained
within them which has since been updated should be reviewed as part of the LDP3 Locality Profile work.  The Audit
should also consider if progress has been made against the key issues and actions identified in the charettes, and how
those issues and actions compare to the feedback gathered through the Big Place Conversation.
Issue 006: Green Belts  A full review of the green belt boundary taking account of new policy context and priorities set out in NPF4.
Issue 007: Brownfield,
Vacant and Derelict
Land, and Empty
Buildings
 Not all brownfield land and vacant buildings will be included within the Scottish Vacant and Derelict Land Survey
(SVDLS), only those which meet the criteria for inclusion in the national survey.  The Proposed Plan will need to use the
most up-to-date data available due to the emphasis in Policy 9 of NPF4 on encouraging, promoting and facilitating the
reuse of brownfield, vacant and derelict land and empty buildings, and helping reduce the need for greenfield
development. gRegister of potential brownfield regeneration sites will help identify the scale of the problem and any
issues relating specifically to Perth and Kinross which may require a local policy response in LDP3, as well as
highlighting potential sites for development. 
 A comparison of retail floorspace vacancy data is not available for smaller town centres of Aberfeldy, Alyth, Coupar
Angus and Dunkeld. 
Issue 008: Coastal
Development and
Aquaculture
 Unclear until planning application stage which areas are in an at-risk flood area. Mapping (currently based on 2009
climate projections) is to be updated and will be used in Proposed Plan site assessments if available but landowners /
developers may be required to provide a Flood Risk Assessment in the interim to determine suitability for allocation.
 Query regarding whether it is the intention of NPF4 to propose a more restrictive precautionary approach to
development for coastal rural areas compared to otherwise similar inland rural areas?  If not, the intention would be to
consider the undeveloped coastline to be isolated/unspoiled coastline, and there would be no undeveloped coastline
in Perth and Kinross.  NPF4 does not define the undeveloped coastline. – unclear whether undeveloped means remote
unspoiled coastline with wild land qualities, or if it is any area outwith a settlement boundary like the areas of
significant constraint mentioned in Scottish Planning Policy 2014.  If it is the former, there is no undeveloped coastline
in Perth and Kinross.  If the latter, then the Proposed Plan could identify the undeveloped coast accordingly.  
Issue 009: Energy,
Heating and Cooling
(including Infrastructure:
Energy Supply Systems)
 Formal Designation of Heat Network Zones – in line with the requirements of the Heat Networks (Scotland) Act 2021 –
is still to take place.  Key considerations are still to be considered as part of the drafting of the Heat in Buildings Bill,
including the potential power for local authorities to require any building owner to end their use of polluting heating
once they have the opportunity to connect to a heat network.  The Scottish Government is currently unable to provide

Page 129

129
Evidence Report Issue Gaps, Uncertainties and any Key Issues raised in Evidence
clarity about the role of HNZs, required connections and planned next steps in the designation process.  Given these
uncertainties, a clear commitment and timescale is not possible at this stage.   
 Landscape Capacity for Wind - The Council’s Landscape Capacity Study for Wind was published in 2010 and therefore
does not reflect the current planning policy framework for wind proposals. The expectations around landscape impacts
have shifted as per NPF4 Policy 11e(ii), whereby significant landscape impacts are to be expected at the localised level
and/or provided appropriate design mitigation is included. There are no plans to update the landscape capacity study
however the draft Renewable Energy Guidance consulted on in 2025 will provide guidance to support implementation
of NPF4 Policy 11, including in relation to project design and layout to mitigate landscape impacts. This will refer to
NatureScot’s Landscape Sensitivity Guidance.
 Pipeline Infrastructure - There are indicative plans for potential new pipeline infrastructure across Scotland including in
the Perth and Kinross Area to support emerging plans around hydrogen production/transmission.  Plans are at an early
stage and will continue to be monitored and considered during the preparation of the Proposed Plan, where relevant.
rUK Energy Governance - The development of UK energy governance arrangements will continue to be monitored and
considered during the preparation of the Proposed Plan, where relevant.
Issue 010: Zero Waste The Perth and Kinross Waste Management Plan covers the period 2010-2025 and is therefore identified as an evidence
gap in this issue.  PKC has begun the process of developing a Circular Waste Plan, which will incorporate a Waste
Management Plan.  It is in the early stages of development, with an expected timeframe for delivery of an approved
plan in 2029. 
Liveable Places
Issue 011: Design,
Quality and Place
 Perth and Kinross Placemaking Guide remains relevant but will require a review and some minor updates to ensure the
references contained within it and the terminology used are in line with NPF4, to allow its future use alongside LDP3. 
 Perth and Kinross LDP2 Design Charettes were produced some time ago and as such the data and statistics within them
has since been updated and should be reviewed as part of our LDP3 Locality Profile work.  The Audit should also
consider if progress has been made against the key issues and actions identified in the Charettes, and how those issues
and actions compare to the feedback gathered through the Big Place Conversation. 
 Our Local Action Plans contain important profiles of the localities of Perth and Kinross, but as they were all published in
2017 the statistical data reported within them are not the most recent available data.  The list of ‘key Issues Identified’
and ‘What needs to change’ accompanying statements contained within the LAPs will be reviewed as part of our LDP3
Locality Profile exercise but will be viewed taking account of relevant up-to-date data and information.

Page 130

130
Evidence Report Issue Gaps, Uncertainties and any Key Issues raised in Evidence
 The Council Ward Profiles also contain some data and information which is now out of date.  As part of the Locality
Profile exercise for developing the Proposed Plan, they should be viewed in the light of the most up-to-date
information available for the key characteristics and challenges for those places.  
Issue 012: Local Living
and 20 Minute
Neighbourhoods
 Age of Infrastructure Capacity Studies, Design Charette reports and Ward Profiles. LDP2 Infrastructure Capacity Studies
were only carried out for the larger settlements. Data to be updated through the Locality Profile work for LDP3 which
will consider all settlements.
 Much of Perth and Kinross is rural but SIMD data zones in rural areas tend to cover a large land area and so is less
helpful at identifying the smaller pockets of deprivation in these areas. 
 As part of the Locality Profile work for LDP3, a Localities Profile template will be developed to set out those factors
which officers will need to take account of in developing their understanding of each place and to satisfy the
requirements of the Act, Regulations, Guidance and NPF4.
 The indicators of access to public transport networks and high frequency services in the Scottish Living Locally Data
Portal would benefit from more recent data. The SLLDP also offers limited information for rural areas.
 Not all information regarding the facilities and services on offer within communities is currently mapped in GIS.
 No timeframe for the carrying out of a future review of the provision of public conveniences.
Issue 013: Blue and
Green Infrastructure

 Following the identification of over 100 new sites to include in the audit following community engagement, the open
space audit work is expected to be completed in Quarter1 of 2025. We are completing this alongside locality profile
work so that the narrative and implications are ready to inform the proposed plan. Tiered settlements are being
prioritised and are expected to be completed by the end of 2025, this includes both the audit and a draft OS
settlement strategy for the OSS.
 Green and Blue Infrastructure was mapped for the LDP Supplementary Guidance but with the removal of statutory
status for such documents, mapping will need to be mapped alongside LDP3’s settlement statements.
 Both the Green Infrastructure mapping and Open Space Audit will address accessibility and connectivity. This will be
supplemented by consideration of nature networks to develop green networks. An initial consultation on priorities for
nature networks took place alongside the consultation on topic papers.
 Offsite delivery of enhancement for biodiversity through development is limited by current law around planning
conditions and may be difficult to secure until new legal mechanisms are in place.

Page 131

131
Evidence Report Issue Gaps, Uncertainties and any Key Issues raised in Evidence
Issue 014: Play,
Recreation and Sport
(including Play
Sufficiency Assessment)
 The provision of opportunities for play, recreation and sport is an evolving process and close collaboration with
partners will be required to ensure LDP3 incorporates the most accurate information and provides an appropriate
spatial strategy and policy framework to promote opportunities.
 SportScotland Facilities Report is dependent on key stakeholder feedback and their Facilities Planning Model is based
on modelling and not actual usage. Local data is therefore used to determine existing and modelled usage.eThe Play
Sufficiency Assessment does not include privately managed equipped play areas. These will be identified, assessed,
and included in the outputs to help address the gaps in provision and accessibility. The current playground strategy
only considers the 4-14 age range which has resulted in a data gap regarding the provision of activities for children and
young people outwith this range. The Play Sufficiency Assessment only includes equipped playgrounds, but younger /
older youngsters may need / seek other forms of play.oThe Playground Strategy excludes settlements of less than 50
houses as the density is too low to justify provision. This is being reviewed as part of this PSA and forthcoming
Playground Strategy Update.
 Following the identification of over 100 new sites to include in the audit following community engagement, the open
space audit work is expected to be completed in Quarter1 of 2025. We are completing this alongside locality profile
work so that the narrative and implications are ready to inform the proposed plan. Tiered settlements are being
prioritised and are expected to be completed by the end of 2025, this includes both the audit and a draft OS
settlement strategy for the OSS.
Issue 015: Flood Risk and
Water Management
(including Drainage and
Water Supply Systems)
 Unclear until planning application stage which areas are in an at-risk flood area. Mapping (currently based on 2009
climate projections) is to be updated and will be used in Proposed Plan site assessments if available but landowners /
developers may be required to provide a Flood Risk Assessment in the interim to determine suitability for allocation.
 The Strategic Flood Risk Assessment helps identify some potential opportunities for improvements to the water
environment through natural flood management and blue-green infrastructure and this will be built upon in the
Proposed Plan spatial strategy. The drought indicator method has not been developed to assess individual Private
Water Supplies and is not provided at a finely grained resolution. Together with other water scarcity mapping it could
help start determining vulnerable areas.
Issue 016: Health and
Safety
 Safeguarding Zones around major hazard sites, major accident pipelines, and airfields will need to be checked to
ensure they remain appropriate.
 Locations of concern for suicide risk will need to be sensitively taken into consideration when preparing the Proposed
Plan.

Page 132

132
Evidence Report Issue Gaps, Uncertainties and any Key Issues raised in Evidence
 Once published, the measures contained in the Perth Air Quality Management Plan will need to be incorporated into
the Proposed Plan.
Homes
Issue 017: Homes To inform the final Local Housing Land Requirement in the Proposed Plan:
 More analysis is needed on the impact of residential properties as holiday accommodation. This will come from data
on the higher Council Tax levy on second homes and the impact of the short-term let licencing requirements.
 An updated needs assessment is being carried out on the accommodation needs of Gypsy/Travellers and Travelling
Show people.
 Enhanced consideration will be given to factors affecting the deliverability of the housing land supply through updated
housing land audits.
Infrastructure and Transportation
Issue 018: Cemetery
Provision
 Finding suitable land for potential burial ground/cemetery provision will potentially compete with other demands on
land. There may be an opportunity to delivery cemetery provision alongside other appropriate land uses and demand
for this will need to inform the spatial strategy.
Issue 019:
Communications and
Digital 
 None identified
Issue 020: Education
Facilities
 School roll capacity data needed to accommodate new development proposals for LDP3 will be assessed by the
Council’s Property and Education and Children’s Services by reviewing individual primary catchment areas and
secondary clusters.
 The methodology for calculating the ‘Pupil Product Ratio’ was developed in 2008 and will require updating.
 The Council has an ongoing priority to improve ASN provision in schools across the local authority area and is
considering funding options to deliver capacity.
Issue 021: Health Care
Facilities
 The Council relies upon evidence from NHS Tayside and the Perth and Kinross Health and Social Care Partnership to
demonstrate infrastructure needs in the area. Aspects of this evidence is not available publicly at present.

Page 133

133
Evidence Report Issue Gaps, Uncertainties and any Key Issues raised in Evidence
Issue 022:
Transportation (Including
Sustainable Transport)
 Some of the datasets used are aged and would benefit from more up to date information.
 There are data items that have yet to be obtained or are not available. The Council will work to identify, update and
address those gaps during the preparation of the Transport Appraisal. The Transport Appraisal work will include the
necessary measures to address gaps related to the quality, frequency and accessibility of public transport services.
 PKC’s commitment and financial contribution to the development of transport infrastructure generally requires the
use of external funding. Consequently, there is a degree of uncertainty regarding the availability of sufficient financial
support at national and regional levels. This may impact the delivery of projects that, under the Infrastructure First
principle, could threaten the viability of development. Key transport routes serving settlements within Perth and
Kinross are also linked to areas in the neighbouring local authorities. The performance of the network, and the ability
to deliver improvements to the regional infrastructure, will often depend on the ability for PKC to work in coordination
with other organisations. There is significant uncertainty surrounding the wider transport industry with regards to the
evolution of working and commuting patterns. Variations to these arrangements can create significant changes to
travel behaviour, shaping demand on specific modes.
Issue 023: Waste Water
Treatment and Water
Supply
 Locality Profiles will consider if the relevant Scottish water/wastewater asset is near capacity, and if it is in a current
investment programme. Information on Scottish Water assets will allow the Council to consider if development should
be planned in locations where there is existing or programmed capacity in the water and wastewater systems.
However, the Proposed Plan spatial strategy will also be fully informed by the Strategic Environmental Assessment
work, and the 20-minute neighbourhood and local living analysis and the Locality Profile work, to ensure development
is focussed on the most sustainable locations
 During the LDP preparation process, we will continue to engage with Scottish Water to inform them of likely areas of
development. Scottish Water has reiterated their commitment to not restrict development. With due communication
and agreement on delivery timeline and phasing, future residential developments can be presumed to receive access
to public water and wastewater services. For industrial uses, Perth and Kinross Council will engage with Scottish Water
directly to identify potential stress points in the available capacity, and the need to deliver suitable infrastructure
Productive Places
Issue 024: Community
Wealth Building
 The Proposed Plan will need to take account of any updates that may be made to the Perth and Kinross Community
Plan (Local Outcomes Improvement Plan) and the Locality Action Plans. These will need to be embedded into the
Proposed Plan.

Page 134

134
Evidence Report Issue Gaps, Uncertainties and any Key Issues raised in Evidence
 It will also need to consider the contents of any registered Local Place Plans, and whether they have implications for
community wealth building in the area because there is a link between community asset transfer opportunities and
Local Place Plans.
Issue 025: Business and
Industry 
 Potential Proposed Plan employment land requirement is indicative and may change upon completion of the 2024
Employment Land Audit.
 To help address identified viability and deliverability issues in the allocated land supply, LDP3 will need to consider
further opportunities for mixed uses allocations where appropriate and ensure there is appropriate cross funding
between housing and employment uses.
 To ensure cross funded serviced sites are oven ready consideration should be given to defining serviced employment
land in the LDP so that there is a consistency in the quality of the cross funded employment land delivered.
 The SVDLS and Urban Capacity Study, when completed, will provide an effective review of capacity and potential
development sites.
 Significant limitations to using SIMD data to inform the employment land strategy as rural deprivation is dispersed. To
identify where future business and industry may provide the most benefit there is a current gap in evidence in terms of
the Locality Profile work. 
 Perth and Kinross Council Employment land matrices utilise a ‘balanced scorecard’ approach to determine the sites
most likely to require Council intervention and their relative attributes. When preparing these assessments, there was
not always enough consideration of active travel links, an area of increased emphasis in national policy. Also, since
they were prepared, there is an increased emphasis on generating economic prosperity for all people and places.
Future updates should consider these aspects carefully.  A transport appraisal will be carried out considering the
cumulative impact of potential new development to inform the Proposed Plan.
Issue 026: Retail, City,
Town, and Commercial
Centres
 The retail forecasts of the Perth and Kinross City and Town Centre Retail study highlight there is no requirement to
plan for major new retail development, but there will be a need to consider neighbourhood scale retail. Whilst there is
a need to move on from retail led centres, sufficient protection should be afforded to footfall generating activities and
allow for proper scrutiny of change of use proposals from town centre use(s) to ground floor residential.
 The LDP will need to identify town, neighbourhood and commercial centres, and consider if Perth City Centre extents
should be redefined. Carrying out a future urban capacity and brownfield study will help identify the scale of the
opportunities for town centre living and any issues which require a response in the Proposed Plan.

Page 135

135
Evidence Report Issue Gaps, Uncertainties and any Key Issues raised in Evidence
 The settlement hierarchy in the existing LDP is largely appropriate however the Retail study 2023 does provide some
guidance on what will require review in the Proposed Plan.
 The Retail study provides recommended definitions to help with the interpretation of NPF4 Policy 28 Retail with
reference to edge of centre sites, to small scale neighbourhood retail, and to the floorspace threshold at which an
impact assessment will be required.
 it is important that the growth of the Eating Out of Home sector supports existing centres which are losing some of
their retail function. There is also scope to consider drive through applications on retail allocations without necessarily
requiring specific allocations for drive throughs.
 The clustering of non-retail uses is not an obvious issue within Perth and Kinross.
Issue 027: Rural
Development
 No Local Place Plans have yet been registered so there is a potential issue in aligning the timescales for the preparation
of these and the Proposed Plan.
Issue 028: Tourism  A lack of up-to-date data, particularly on recent levels of usage to inform decisions relating to visitor management.
 Some data is currently only available at national level.
 Difficult to understand the scale of the problems in relation to active and sustainable transport and the implications for
both visitors and workers without first understanding baseline data in relation to traffic levels, wider connectivity, and
origins / destinations of travel to work areas.
Issue 029: Culture and
Creativity
 Statistics for turnover, employment numbers and registered businesses dates from 2021-23. More recent data is not
yet available.
 Age of some data on community views of their local assets, their aspirations, areas for improvement, and a vision for
the future of their place e.g. Infrastructure Capacity Studies, Design Charettes, and Community Action Plans. Any
updates to data within these will be reviewed as part of the LDP3 Locality Profile work.
 Difficult to know how up to date the information contained on the Your Community PK website is regarding local
groups and services.
 The Localities Profile template to be developed as part of the Locality Profile work for LDP3 should allow for an up-to-
date GIS based audit of existing cultural offering in a place and highlight where there is a known demand for additional
or improved opportunities and facilities.
Issue 030: Minerals  There is a need for improved data on both demand and also product flows. In the absence of data on predicted
demand for minerals, a 10-year landbank cannot be accurately calculated. More engagement with the minerals

Page 136

136
Evidence Report Issue Gaps, Uncertainties and any Key Issues raised in Evidence
industry, including industry bodies and active operators may allow us to state with more confidence whether a 10-year
landbank exists.
 The evidence suggests that in the Tay area, there is likely to be sufficient permitted reserves for crushed rock but that
there may not be sufficient reserves of sand and gravel to meet the demand for a 10-year landbank, as required by
NPF4.

Page 137

137
Position Statement and Table of Disputes

Page 138

138
POSITION STATEMENT
The purpose of this section is to identify those issues where the sufficiency
of the evidence, or the implications of that evidence, has been disputed by
stakeholders.
During our 6-week public consultation exercise a significant number of
comments were received to our suite of Topic Papers.  The detailed
responses to these are set out in the Statement of Agreement / Disputes
section at the end of each issue in Appendices A to E.  
Resolution of Disputes
Given the number of responses, the Council’s efforts were concentrated
on liaising with key stakeholders who had raised formal disputes.  
Content of Table of Disputes
The Table of Disputes below includes: 
 All comments from respondents who wished to register a formal
dispute to the evidence.  These have been indicated in the table
with a star symbol.  
 Comments where the respondents did not wish to submit a formal
dispute, but they did indicate that they disagreed with the evidence
or the implications of that evidence.  It is therefore considered
appropriate to bring these to the Reporter’s attention also. 
 An indication of status of each dispute – for the vast majority, the
Council has reached the view that no further action is required at
Evidence Report stage as a result of the dispute raised.
Perth and Kinross Council’s Response to Disputes
In responding to some of the disputes, Council officers reached the
conclusion that they were able to respond without further discussion with
the stakeholder.  For example, where a dispute had been made about the
lack of a document and that document has now been included in the
evidence, or the dispute related to site-specific matters which were not
appropriate to consider at Evidence Report stage.  It is, however,
considered appropriate to note these given that they were submitted as
formal disputes to the evidence.  
Some other formal disputes include where the respondent has disagreed
with the evidence presented in the Topic Paper but, after consideration,
the Council considers these are not matters that require action to be taken
at Evidence Report stage but will be considered through the development
of the Proposed Plan.  These are, however, also included in the Table of
Disputes.
Where discussions with a stakeholder subsequently resulted in the
resolution of their dispute, this has been noted in the Dispute Status
column of the table.    Disputes which were received from Sportscotland
and SEPA have been resolved.  There are no outstanding disputes from any
of the key stakeholders.  All of the disputes from other stakeholders are
not considered by the Council to require any further action at Evidence
Report stage.

Page 139

139
TABLE OF DISPUTES
Evidence Report
Issue
Appendix
and Issue Respondent Issue Disputed Dispute Status Document
Reference
Sustainable Places
Tackling the
Climate and
Nature Crises
A, 001 Holder Planning on
behalf of SSE
Renewables  
The respondent disputes the list of evidence
reviewed due to the Omission of the Onshore Wind:
Policy Statement 2022 from Topic Paper 004.  
Council considers no
further action is
required at this
stage
Appendix A, Issue
001: Tackling the
Climate and Nature
Crises and Issue 009:
Energy, Heating and
Cooling
Homes for Scotland Homes for Scotland disagrees with but does not
dispute the evidence and summary of implications
due to:
 Section 3F of the Town and Country Planning
(Scotland) Act 1997, introduced by Section 72 of
the Climate Change (Scotland) Act 2009 has now
been repealed. 
 LDP3 Spatial Strategy to ensure a balance
between sustainable and marketable locations, as
well as deliverability of new developments in
meeting the MATHLR for the Perth and Kinross
Area, and the links between new development
and infrastructure provisions/investment. 
Council considers no
further action is
required at this
stage
Appendix A, Issue
001: Tackling the
Climate and Nature
Crises
Private Individual The respondent indicated that they disagree with
but does not dispute the summary of implications of
the evidence listed in Topic Paper 004 for the
Proposed Plan, due to the implications not having
been set out in finer detail, and no attempts on
quantifying certain elements like damages.
Council considers no
further action is
required at this
stage
Appendix A, Issue
001: Tackling the
Climate and Nature
Crises
Savills on behalf of
Dupplin Estate
The respondent disagreed with but does not dispute
the list of evidence reviewed under Topic Paper 004
and suggests the inclusion of an additional source of
Council considers no
further action is
Appendix A, Issue
001: Tackling the

Page 140

140
Evidence Report
Issue
Appendix
and Issue Respondent Issue Disputed Dispute Status Document
Reference
evidence.  They also provide further comments
regarding: 
 The work of landowners and the contribution
they can make to delivery of this policy issue’s
outcomes, including location specific examples.
 Their view that the Topic Paper is skewed
towards private vehicle use.
required at this
stage
Climate and Nature
Crises
Biodiversity and
Natural Places
(including
Landscapes)
A, 002 Ristol Consulting Did not disagree with the summary of implications
for the Proposed Plan but would welcome the
development of a biodiversity net gain framework, a
future developer contributions policy, and a
biodiversity register for offsite enhancement. 
Council considers no
further action is
required at this
stage
Appendix A, Issue
002: Biodiversity and
Natural Places
SEPA Disagrees with but does not dispute the list of data
reviewed:
 Recommends Strategic Flood Risk Assessment in
Nature Network (NN) mapping, rather than flood
maps alone
 Recommends including the 2021 update for
RBMPs (RBMP3) as important for NNs
 Emphasises the importance of the water
environment to NNs, and requests river corridors
are established as a key principle in the
identification of NNs across Perth and Kinross
Council considers no
further action is
required at this
stage
Appendix A, Issue
002: Biodiversity and
Natural Places
Homes for Scotland Disagree with the implications for the Proposed Plan
because of:
 LDP3 should not restrict development from
happening completely, specifically referring to
proposals which align with NPF4 Policy 4 in terms
of providing socio-economic benefits e.g. house
building
Council considers no
further action is
required at this
stage
Appendix A, Issue
002: Biodiversity and
Natural Places

Page 141

141
Evidence Report
Issue
Appendix
and Issue Respondent Issue Disputed Dispute Status Document
Reference
 Topic Paper should recognise that risks to the
water environment can be mitigated through the
use of a Construction Environment Management
Plan
 Trees/woodland on promoted sites should not
preclude the site from development
 Provides further information regarding the work
of their members in response to integrating,
supporting, and enhancing biodiversity and
habitat connectivity.
 Site selection consideration should include other
factors including marketability and deliverability
Private individual The respondent wishes to formally dispute the list of
evidence/datasets reviewed and summary of
implications provided due to:
 The lack of consideration to local biodiversity
 The negative impact of development
Council considers no
further action is
required at this
stage
Appendix A, Issue
002: Biodiversity and
Natural Places
Core Doc. Refs:
CD105 and CD106
Private individual The respondent disagreed with, but did not dispute,
the list of evidence reviewed and summary of
implications for the Proposed Plan.  However, they
did not provide any further details to support this
disagreement other than “there is no climate or
nature crisis.”
Council considers no
further action is
required at this
stage
Appendix A, Issue
002: Biodiversity and
Natural Places
Soils A, 003 Savills on behalf of
Scone Estate
There should be recognition that the designation of
prime agricultural land on the National Scale Land
Capability for Agriculture map and the Land
Capability for Agriculture (partial cover) map
provides information which is ultimately broad in
scope and cannot be relied upon at the local level
Council considers no
further action is
required at this
stage
Appendix A, Issue
003: Soils

Page 142

142
Evidence Report
Issue
Appendix
and Issue Respondent Issue Disputed Dispute Status Document
Reference
without further specific inspections of the specific
sites concerned.
Forestry,
Woodland and
Trees
A, 004 Anonymous The respondent disagreed with but did not dispute
the summary of implications for the Proposed Plan
under Topic Paper 007 due to:
 New approaches are required to addressing the
challenges and opportunities presented by
climate change
 PKC need to ensure new woodland creation
schemes are not constrained by previous policy
approaches towards protecting agricultural land
but assessed on their merits.
 In relation to development within woodland,
LDP3 should cover locational factors, including
high levels of rural deprivation linked to access to
quality and affordable homes, employment
space, and transport services. 
Council considers no
further action is
required at this
stage
Appendix A, Issue
004: Forestry,
Woodland and Trees
Anonymous The respondent disagreed with but did not dispute
the list of evidence reviewed and summary of
implications for the Proposed Plan due to:
 A Council policy on deer control is essential
 The evidence seems to suggest that the Council
“will blindly approve commercial forestry
expansion…[which] is not consistent with [the
Council’s] …biodiversity strategy.”
 Land Capability maps are inadequate.
Council considers no
further action is
required at this
stage
Appendix A, Issue
004: Forestry,
Woodland and Trees
Private Individual The Topic Paper 007 “fails to represent the actual
activities of PKC in the arena.”
Council considers no
further action is
required at this
stage
Appendix A, Issue
004: Forestry,
Woodland and Trees

Page 143

143
Evidence Report
Issue
Appendix
and Issue Respondent Issue Disputed Dispute Status Document
Reference
Historic Assets
and Places
A, 005 Perth and Kinross
Heritage Trust
Additional information can be supplied to raise
awareness of the Perth and Kinross Historic
Environment Record; the Trust’s role as
archaeological advisors to the Council; other PKHT
resources; and regional and national resources.
More emphasis on public benefit outcomes,
undesignated sites and reuse of listed buildings.
The Trust’s
comments and
additional
information will be
used in the
preparation of the
Proposed Plan.
Council considers no
further action is
required at this
stage
Appendix A, Issue
005: Historic Assets
and Places
Private individual Concerned about whether specific heritage assets
have been identified in the Topic Paper.
Council considers no
further action is
required at this
stage
Appendix A, Issue
005: Historic Assets
and Places
Green Belts A, 006 Private Individual Maps are unreadable online. PKC have consistently
ignored the green belt around Scone making any
commitment meaningless and the topic paper fails
to identify what the village ‘envelope’ scale is.
Council considers no
further action is
required at this
stage
Appendix A, Issue
006: Green Belts
Homes for Scotland A green belt review must be carried out for the
Evidence Report.
Council considers no
further action is
required at this
stage
Appendix A, Issue
006: Green Belts
Savills on behalf of
Scone Estate
PKC should take a root and branch approach to the
review of the green belt and consider whether it
remains relevant. Scone Estates should be identified
as a major business in the Green Belt.
Council considers no
further action is
required at this
stage
Appendix A, Issue
006: Green Belts
Ristol Consulting Application of the Housing in the Countryside Policy
in the Green Belt should be explored. Policy drives
change and as such a spatial framework which
Council considers no
further action is
required at this
stage
Appendix A, Issue
006: Green Belts and
Appendix D, Issue 22

Page 144

144
Evidence Report
Issue
Appendix
and Issue Respondent Issue Disputed Dispute Status Document
Reference
actively focuses on decarbonising heat and transport
would enable scalable change.
Infrastructure -
Transportation
Not provided Craigend requires to be properly considered on the
ground and compared against the other similar
settlements around Perth which have been omitted
from the green belt.
Council considers no
further action is
required at this
stage
Appendix A, Issue
006: Green Belts
Not provided Disagree that urban areas have to be more densely
populated in order to protect green belt.
Council considers no
further action is
required at this
stage
Appendix A, Issue
006: Green Belts
Brownfield,
Vacant and
Derelict Land, and
Empty Buildings
A, 007 Errol Community
Council
There is insufficient data to determine what is
considered vacant and derelict in the Errol
Community Council Area.
Council considers no
further action is
required at this
stage
Appendix A, Issue
007: Brownfield,
Vacant and Derelict
Land and Empty
Buildings
Homes for Scotland There is a need for greater recognition of the
Housing Land Audit as a source of evidence and
potential for brownfield sites.
Council considers no
further action is
required at this
stage
Appendix A, Issue
007: Brownfield,
Vacant and Derelict
Land and Empty
Buildings
Not provided Dispute the accuracy of the total brownfield /
derelict area across the PKC area out with urban
areas, the extent of brownfield / derelict land at
Errol Airfield, and the omission of any reference to
Errol Airfield.
Council considers no
further action is
required at this
stage
Appendix A, Issue
007: Brownfield,
Vacant and Derelict
Land and Empty
Buildings
Not provided Vacant sites when they come up should be looked at
as an opportunity to reduce existing and future flood
risk within urban areas.
Council considers no
further action is
required at this
stage
Appendix A, Issue
007: Brownfield,
Vacant and Derelict
Land and Empty
Buildings

Page 145

145
Evidence Report
Issue
Appendix
and Issue Respondent Issue Disputed Dispute Status Document
Reference
Energy, Heating
and Cooling
(including
Infrastructure:
Energy Supply
Systems)
A, 009 Scottish Enterprise The respondent disagreed with, but did not wish to
register as a formal dispute, the list of evidence/
datasets and the summary of implications for the
Proposed Plan due to the wording used at para. 2.35
of Topic Paper 012 in relation to the role of hydrogen
in the gas grid for future home heating, as the
Scottish Government’s Hydrogen Action Plan places
hydrogen for home heating low on the hierarchy of
uses and specifically notes that it is not considered
to play a central role in decarbonising heat.
Council considers no
further action is
required at this
stage
Appendix A, Issue
009: Energy, Heating
and Cooling
Homes for Scotland The respondent disagreed with, but did not wish to
formally dispute, the list of evidence reviewed, and
summary of implications provided under Topic Paper
012: Energy, Heating and Cooling for the following
reasons:
 Suggested an additional list of evidence/ datasets
for inclusion
 Section 3F of the Town and Country Planning
(Scotland) Act 1997, introduced by Section 72 of
the Climate Change (Scotland) Act 2009 has now
been repealed. 
 Energy infrastructure will have an impact on the
locations suitable for accommodating housing
development – need to consider compatibility in
relation to expansion of national grid network
 The Council will need to work with Distribution
Network Operators (DNO) to ensure an upgrade
to the network is aligned with future housing
supply pipeline.
Council considers no
further action is
required at this
stage
Appendix A, Issue
009: Energy, Heating
and Cooling

Page 146

146
Evidence Report
Issue
Appendix
and Issue Respondent Issue Disputed Dispute Status Document
Reference
 Ensuring alternative heating solutions are
available will ensure housing need identified in
HfS report ‘Existing Housing Need in Perth and
Kinross’ is not delayed. 
Holder Planning on
behalf of SSE
Renewables
 Omission of onshore wind: policy statement
2022 from legal and National Policy
Requirements and Expectations section and from
Section 2. 
 Disagrees with the use of the Landscape Capacity
Study (2010) for assessing proposals against the
new LDP, as well as the potential for a spatial
strategy for renewable development being
included within the new LDP.
Council considers no
further action is
required at this
stage
Appendix A, Issue
009: Energy, Heating
and Cooling
Private Individual The respondent disagreed with, but did not dispute,
the list of evidence/ datasets reviewed as part of
Topic Paper 012.  In their view:
 The Topic Paper did not consider the potential
concerns over the commercial robustness of
providers and the implications of failure of the
enterprise.  
 The topic does not give sufficient focus on the
rural elderly on migrating from LPG/Gas to other
forms of heating, and the assistance they may
need.
Council considers no
further action is
required at this
stage
Appendix A, Issue
009: Energy, Heating
and Cooling
Liveable Places
Design, Quality
and Place
B, 011 A.S. Associates Ltd.
Planning and
The respondent disagreed with but did not dispute
the list of evidence reviewed because of:
Council considers no
further action is
Appendix B, Issue
011: Design, Quality
and Place

Page 147

147
Evidence Report
Issue
Appendix
and Issue Respondent Issue Disputed Dispute Status Document
Reference
Architectural
Services
 A lack of clarity as to which datasets will be used
in the Settlement Audit and Site Appraisal work,
and provided suggested datasets for inclusion
required at this
stage
Homes for Scotland The respondent disputed the list of evidence
reviewed on that basis that the Council should
include the additional data listed in their response,
and analyse how this will influence the design,
quality and place that will be created by future
development.
Council considers no
further action is
required at this
stage
Appendix B, Issue
011: Design, Quality
and Place
Private Individual Topic Paper 018 fails to address any of the recent
historical activity and objection of the local
community.
Council considers no
further action is
required at this
stage
Appendix B, Issue
011: Design, Quality
and Place
Local Living and
20 Minute
Neighbourhoods
B, 012 Private individual The respondent disagreed with, but did not dispute
the list of evidence and summary of implications, as
in their view “people do not want to live in a 20
minute city.”
Council considers no
further action is
required at this
stage
Appendix B, Issue
012: Local Living and
20 Minute
Neighbourhoods
Errol Community
Council
The respondent disputed the list of evidence
reviewed and summary of implications for the
Proposed Plan on the basis that they do not consider
that it is appropriate for Errol Community Council
area and the Carse of Gowrie as a whole to be part
of Eastern Perthshire and consider that we would be
better aligned with Bridge of Earn. We do not
consider that the evidence is up to date or
particularly relevant.
Council considers no
further action is
required at this
stage
Appendix B, Issue
012: Local Living and
20 Minute
Neighbourhoods
Homes for Scotland Homes for Scotland disagreed with the list of
evidence and summary of implications on the basis
that their members’ role as a principal funder of
future investments must be fully recognised, as
should their role in the journey towards net zero. It
Council considers no
further action is
required at this
stage
Appendix B, Issue
012: Local Living and
20 Minute
Neighbourhoods

Page 148

148
Evidence Report
Issue
Appendix
and Issue Respondent Issue Disputed Dispute Status Document
Reference
should be noted that larger-scale housing
developments may be able to create new 20 minute
neighbourhoods. If a proportion of the local housing
land requirement is identified in town centres, then
any site needs to be available and deliverable and if
policy interventions are required then these should
be set out at the outset.
Avison Young on
behalf of Aldi Stores
Ltd.
The respondent disagreed with, but did not dispute
the list of evidence and summary of implications on
the basis that the report that has been produced
[Topic Paper 019] appears to be a plan of how to
prepare an evidence report rather than an evidence
report itself. We consider the evidence report to be
lacking in sufficient detail to enable a response on its
adequacy.
Council considers no
further action is
required at this
stage
Appendix B, Issue
012: Local Living and
20 Minute
Neighbourhoods
A.S Associates Ltd
Planning and
Architectural
Services
The respondent disagreed with, but did not dispute
the list of evidence reviewed and summary of
implications provided due to their view that it is not
clear what datasets will provide evidence for the
settlement audit and site appraisal work.  This
should include reference to the planning history of
land around settlements.
Council considers no
further action is
required at this
stage
Appendix B, Issue
012: Local Living and
20 Minute
Neighbourhoods
Gray Planning &
Development Ltd on
behalf of GS Brown
Construction Ltd
The respondent disagreed with, but did not dispute
the list of evidence reviewed and summary of
implications provided on the basis that to date no
formal Local Place Plans have been registered and
therefore question how developers and landowners
are expected to produce new neighbourhood
proposals where it is likely that the intent of LPPs will
Council considers no
further action is
required at this
stage
Appendix B, Issue
012: Local Living and
20 Minute
Neighbourhoods

Page 149

149
Evidence Report
Issue
Appendix
and Issue Respondent Issue Disputed Dispute Status Document
Reference
feed into site identification and assessment for new
LDPs.
Private individual The respondent disputed the list of evidence
reviewed and summary of implications for the
Proposed Plan on the basis that 20-minute travel
fails to address community, social and family friends
and family activity, and the mental wellbeing in
regularly connecting with these activities.
Council considers no
further action is
required at this
stage
Appendix B, Issue
012: Local Living and
20 Minute
Neighbourhoods
Blue and Green
Infrastructure
B, 013 Unknown The topic paper does not recognise key active travel
routes. Specific reference is made to the Loch Leven
Heritage Trail and associated linking paths.
Council considers no
further action is
required at this
stage
Appendix B, Issue
013: Blue and Green
Infrastructure
SEPA The topic paper does not include sufficient evidence
to identify blue networks. Mapped sources which
identify the river network and other water
environment features along with the output of the
finalised SFRA and the geomorphic risk layer would
provide relevant evidence. The respondent made
specific reference to the water classification hub,
which provides the most recent classification data
regarding the water environment.
The respondent stated the implications of BGI as
part of an infrastructure first approach to the spatial
strategy should be highlighted. Furthermore, the
benefits of BGI for climate adaptation should be
expanded and strengthened, with links to NPF4
policies 1, 2 and 18 highlighted. 
Council considers no
further action is
required at this
stage
Appendix B, Issue
013: Blue and Green
Infrastructure
Homes for Scotland Stronger reference should be made to implications
of NPF4 Policy 20b “development proposals for
incorporating new or enhanced blue and/or green
infrastructure will be supported.” LDP3 should
Council considers no
further action is
required at this
stage
Appendix B, Issue
013: Blue and Green
Infrastructure

Page 150

150
Evidence Report
Issue
Appendix
and Issue Respondent Issue Disputed Dispute Status Document
Reference
recognise that alongside matters relating to BGI,
other factors must also be taken into consideration,
including marketability and deliverability, to ensure
Scotland’s housing needs are met.
Play, Recreation
and Sport
(including Play
Sufficiency
Assessment)
B, 014 Errol Community
Council
Disagree that evidence is sufficient noting that the
Play Sufficiency Assessment has not been published,
the Open Space Strategy is only being prepared, and
the SportScotland Facilities Planning Modelling is
incomplete. Concern is also raised regarding the
summary of facilities for Eastern Perthshire
(Appendix 3) is representative of the Carse of Gowrie
and Errol Community Council.
Council considers no
further action is
required at this
stage
Appendix B, Issue
014: Play, Recreation
and Sport
SportScotland Disagree with the sufficiency of the list of
evidence/datasets identified in Topic Paper 022.
Dispute resolved -
reference to
SportScotland
Facilities Report was
provided.
Appendix B, Issue
014: Play, Recreation
and Sport
Appendix B, Issue
014: Sportscotland
Dispute
Core Doc. Ref:
CD101
Flood Risk and
Water
Management
(including
Drainage and
Water Supply
Systems)
B, 015 SEPA SEPA has a formal dispute. The water classificaon
hub is the RBMP data source which provides the
most recent classificaon data regarding the water
environment should be included as an evidence
source. SEPA can confirm we also dispute the dra
SFRA due to the absence of the mapped output from
the detailed studies. Posion on both these maers
could be reviewed if a finalised SFRA which includes
Dispute resolved -
SFRA updated to
include flood study
mapping, and
Evidence report
updated to include
water environment
hub as an evidence
source
Appendix B, Issue
015: Flood Risk and
Water Management
Appendix B, Issue
15: SEPA Dispute
Core Doc Refs: CD97-
CD99

Page 151

151
Evidence Report
Issue
Appendix
and Issue Respondent Issue Disputed Dispute Status Document
Reference
output from the detailed studies is provided prior to
submission to the Gate Check.
Private individual 1 The Craigie Burn Flood Study must be redone using
flow rate figures agreed with residents who have
knowledge in this field.
Considers work is yet to start on a Perth Surface
Water Management Plan and seeks an update on
Perth Integrated Catchment Study.
Council considers no
further action is
required at this
stage
Appendix B, Issue
015: Flood Risk and
Water Management
Private individual 2 The Craigie Burn Flood Study must be redone using
flow rate figures agreed with residents who have
knowledge in this field.
Considers work is yet to start on a Perth Surface
Water Management Plan.
Council considers no
further action is
required at this
stage 
Appendix B, Issue
015: Flood Risk and
Water Management
Private individual 3 Respondent considers that the Craigie Burn Flood
Study must be redone using flow rate figures agreed
with residents who have knowledge in this field.
Considers SWMP is needed to inform an accurate
flood risk secon within LDP3. Also menons
concerns about specificaon and maintenance of
SUDs.
Council considers no
further action is
required at this
stage
Appendix B, Issue
015: Flood Risk and
Water Management
Private individual 4 Disputes Craigie Burn Flood Study findings. More
account should be taken of the foul and combined
sewer networks. Also considers this issue should
idenfy areas for flood management.
Council considers no
further action is
required at this
stage
Appendix B, Issue
015: Flood Risk and
Water Management
Homes for Scotland Refers to updated SEPA guidance, and to Scosh
Government consultaon on Flood Resilience
Strategy. Homes for Scotland Site Assessment
Methodology: provides a template for assessing sites
based on the policies within NPF4 Copy attached to
our response to the “Homes” Topic Paper. Refers to
Council considers
that no further
acon is required at
this stage.
Appendix B, Issue
015: Flood Risk and
Water Management

Page 152

152
Evidence Report
Issue
Appendix
and Issue Respondent Issue Disputed Dispute Status Document
Reference
checklist criteria for flood risk, which requires that an
FRA should be undertaken prior to potenal
inclusion of a site in the Proposed Plan if it might be
within an at risk area.
Montague Evans (on
behalf of Loch
Developments Ltd)
Further understanding should be given to the
implicaons of the commied Flood Defence works,
such as those in Kinross, which will influence the
flood risk data.
Council considers no
further action is
required at this
stage
Appendix B, Issue
015: Flood Risk and
Water Management
Private individual 5 The topic paper does not menon 'deforestaon' for
development impacng both surface water and
subterranean water flows, nor address the impact of
proposed and exisng development on subterranean
aqua flows especially in the Scone area.
Council considers no
further action is
required at this
stage.
Appendix B, Issue
015: Flood Risk and
Water Management
Stuart Buchanan on
behalf of Cardross
Asset Management
Ltd
Strategic Flood Risk Assessments should involve PKC,
SEPA, Scosh Water and affected landowners.
Engagement is of crical importance for Inveralmond
Industrial Estate (including LDP development site
E38), where PKC is required to advance flood
protecon measures.
Council considers no
further action is
required at this
stage.
Appendix B, Issue
015: Flood Risk and
Water Management
Homes
Homes C, 017 Private Individual Using data from a self-interested source – Homes for
Scotland – distorts the report. The premise that
houses lead to growth should be substantiated. An
estimate of available employment opportunities
should be indicated. The Report is the foundation of
other reports in the submission so should be
accurate and unbiased.
Council considers no
further action is
required at this
stage
Appendix C, Issue
017: Homes
Homes for Scotland The MATHLR is to be exceeded Council considers no
further action is
Appendix C, Issue
017: Homes

Page 153

153
Evidence Report
Issue
Appendix
and Issue Respondent Issue Disputed Dispute Status Document
Reference
required at this
stage
Savills on behalf of
Scone Estate
Data to be used to reflect Self and custom build
demand/need, a lack of acknowledgement of the
facilitatory role of housing in meeting other spatial
strategy aims, and the need for a balanced approach
to use of NPF4 policies to ensure appropriate and
increased delivery of rural housing.
Council considers no
further action is
required at this
stage
Appendix C, Issue
017: Homes
Ristol Consulting Would welcome exploring a policy framework to
accelerate the delivery of affordable, sustainable
homes in rural areas.
Council considers no
further action is
required at this
stage
Appendix C, Issue
017: Homes
Infrastructure and Transportation
Health Care
Facilities
D, 021 Homes for Scotland In support of local living and maximising the use of
existing assets it is likely that more detailed analysis
of local healthcare provision will be required than
detailed in the outputs of the Primary Care Premises
Strategy 2023-2028. Additional sources of evidence
suggested: Existing Housing Need in Perth and
Kinross (2024), Measuring Use of Health Services by
Equality Group (2017), 2018-based Population
Projections by Council Area in Scotland, and NHS
Scottish Public Health Observatory.
Council considers no
further action is
required at this
stage
Appendix D, Issue
021: Health Care
Facilities
Private Individual Poor quality of graphics online. The unabated
development of Village communities put a strain on
GPs and other primary care services without
indication that these will be augmented.
Council considers no
further action is
required at this
stage
Appendix D, Issue
021: Health Care
Facilities
Transport D, 022 Homes for Scotland The Scottish Governments Local living and 20 minute
neighbourhoods: planning guidance should be
Council considers no
further action is
Appendix D, Issue
022: Transport

Page 154

154
Evidence Report
Issue
Appendix
and Issue Respondent Issue Disputed Dispute Status Document
Reference
acknowledged and form part of the evidence
gathering for this issue.
required at this
stage
Wastewater
Treatment and
Water Supply
D, 023 Scottish Water  Scottish Water does not disagree, but request for
changing of some text relating to water and
wastewater. Also, Scottish Water can provide spatial
layers via GIS of our capacities at water and waste
water treatment works across Perth and Kinross.
Council considers no
further action is
required at this
stage
Appendix D, Issue
023: Wastewater
Treatment and
Water Supply
Core Doc Ref: CD102
Productive Places
Community
Wealth Building
E, 024 Homes for Scotland Different home builders will have different
approaches to community wealth building, some
employing local labour directly and some utilising
local sub-contractors. In either case development
should not be unduly delayed.
Council considers no
further action is
required at this
stage
Appendix E, Issue
024: Community
Wealth Building
Business and
Industry 
E, 025 Homes for Scotland Consider there is potentially an issue in that the
2024 Employment Land Audit will not be available to
inform the Evidence Report, particularly given a 2023
audit was not prepared. An “urban capacity and
brownfield study” which is referred to, should be
available for review prior to the Evidence Report
being submitted to the Gate Check.
Council considers
no further action is
required at this
stage
Appendix E, Issue
025: Business and
Industry
Savills on behalf of
Scone Estates
Want Council's explicit recognion that private
investment can unlock delivery of employment land
and that investment in the Cross Tay Link Road
(CTLR) is intended to unlock significant addional
investment and the Evidence Report and LDP3 must
reflect this by freeing up development opportunies
in conjuncon with the opening of the new road
infrastructure. The restricons created by the
Council considers
no further action is
required at this
stage
Appendix E, Issue
025: Business and
Industry

Page 155

155
Evidence Report
Issue
Appendix
and Issue Respondent Issue Disputed Dispute Status Document
Reference
exisng green belt designaon should be addressed,
this should go further than simply making the CTLR
the green belt northern boundary.
Stuart Buchanan on
behalf of Cardross
Asset Management
Ltd
The Rydens 2022 report update, and 2024
Employment Land Audit will not be available to
inform the Evidence Report. Also concerned that
Class 6 development at strategic transport juncons
but in smaller selements should also be supported
within LDP 3.
Council considers no
further action is
required at this
stage 
Appendix E, Issue
025: Business and
Industry
Retail, City, Town,
and Commercial
Centres
E, 026 Lichfields on behalf
of McDonalds
The evidence listed within Perth and Kinross’ Topic
Paper is not considered sufficient to accurately
create new policy wording in the future LDP
regarding drive-thru developments.
Council considers no
further action is
required at this
stage 
Appendix E, Issue
026: Retail, City,
Town and
Commercial Centres
Montague Evans on
behalf of Loch
Developments Ltd
Seeks the allocation of the former BCA for mixed
uses, retail, drive through and residential.
Council considers no
further action is
required at this
stage
Appendix E, Issue
026: Retail, City,
Town and
Commercial Centres
Avison Young on
behalf of Aldi Stores
Ltd
It is considered that less capacity has been identified
than available and inaccurate conclusions reached
about deficiencies across Perth. Aldi stores also
disagree with the implications for the Proposed Plan.
Council considers no
further action is
required at this
stage
Appendix E, Issue
026: Retail, City,
Town and
Commercial Centres
Rural
Development
E, 027 Homes for Scotland Council research on housing systems pressures must
be made available prior to submission of Evidence
Report, the Diffley Report must be referenced, and it
must be recognised that new development in rural
areas can help sustain existing services.
Council considers no
further action is
required at this
stage
Appendix E, Issue
027: Rural
Development and
Appendix C, Issue
017: Homes
Savills on behalf of
Scone Estate
The assessment of Self and Custom Build
demand/need should use broader data sources and
not just rely on historic planning consents.
Council considers no
further action is
Appendix E, Issue
027: Rural
Development

Page 156

156
Evidence Report
Issue
Appendix
and Issue Respondent Issue Disputed Dispute Status Document
Reference
Note: Same dispute raised under Appendix C1:
Homes.
required at this
stage
Savills on behalf of
Scone Estate
The Council must consider data sources regarding
population to support growth in rural settlements
and housing clusters to revitalise rural areas with
supportive planning policies and generous housing
allocations.
Council considers no
further action is
required at this
stage
Appendix E, Issue
027: Rural
Development
Andrew McCafferty
Associates
 More fine-grained analysis of up-to-date
completions and land supply data is required for
the rural areas 
 There is a need for a continued supply of new
allocations in rural areas and a review of historic
allocations which have not been delivered.
 A more fine-grained analysis of the HLA 2023
should be undertaken to establish trends in
housing completions in the rural areas
Council considers no
further action is
required at this
stage
Appendix E, Issue
027: Rural
Development
Ristol Consulting  Within rural areas would welcome exploring a policy
framework to accelerate the delivery of affordable,
sustainable homes.
Council considers no
further action is
required at this
stage
Appendix E, Issue
027: Rural
Development
Tourism E, 028 Savills on behalf of
Scone Estate
 The significance of the tourism sector to PKC
must be understood and reflected in planning
policy.                   
 Significant care will be needed in designating
tourism areas of growth potential or restraint
without stifling opportunities which arise but
cannot be readily planned for.
Council considers no
further action is
required at this
stage
Appendix E, Issue
028: Tourism
Culture and
Creativity
E, 029 Errol Community
Council
The respondent disagreed with but did not dispute
the list of evidence reviewed due to insufficient
evidence of community based cultural activity, such
Council considers no
further action is
Appendix E, Issue
029: Culture and
Creativity

Page 157

157
Evidence Report
Issue
Appendix
and Issue Respondent Issue Disputed Dispute Status Document
Reference
as informal adult classes, voluntary and youth groups
and how these can be supported and connected to
the larger vision of cultural activity and growth.
required at this
stage
Private Individual The respondent disputed the list of evidence and
datasets provided in Topic Paper 030: Culture and
Creativity and the summary of implications because
of the employment data being misrepresented.
Council considers no
further action is
required at this
stage
Appendix E, Issue
029: Culture and
Creativity
Savills on behalf of
Scone Estate
The respondent did not disagree with the list of
evidence reviewed and the summary of implications
provided, but under the ‘Further Comments’ option
they highlighted that here is a lack of data included
in Topic Paper 030: Culture and Creativity on the
contribution of estates and significant historic and
cultural locations.
Council considers no
further action is
required at this
stage
Appendix E, Issue
029: Culture and
Creativity
Other Comments,
Place-Based
Comments
F, Issue
031
Anonymous The respondent wishes their comments to be
recorded as a formal dispute on the grounds that
Craigend requires to be properly considered on the
ground and compared against the other similar
settlements around Perth which have been omitted
from the green belt.
Council considers no
further action is
required at this
stage
Appendix F, Issue
031: Place-Based
Comments
Anonymous The respondent disagreed with the list of evidence
and summary of implications highlighting their
concern about Rattray and Blairgowrie in relation to
maintenance of streets, housing, green spaces, and
vacant sites.
Council considers no
further action is
required at this
stage
Appendix F, Issue
031: Place-Based
Comments
Savills (on behalf of
Scone Estate)
The respondents wished to formally dispute this
issue on the grounds that the assessment of Self and
Custom Build demand/need should use broader data
sources and not just rely on historic planning
consents.
Council considers no
further action is
required at this
stage
Appendix F, Issue
031: Place-Based
Comments
Appendix C, Issue
017: Homes

Page 158

158
Evidence Report
Issue
Appendix
and Issue Respondent Issue Disputed Dispute Status Document
Reference
Appendix E, Issue
027: Rural
Development
Other Comments,
Topic Paper 001:
The Plan Area
F, Issue
032
Errol Community
Council
The respondent wishes for their comments to be
registered as a formal dispute due to the map shown
in Figure 7 of Topic Paper 001 not being accurate
compared with the information shown on the map
at National Land Capability for Agriculture in
Scotland.
Council considers no
further action is
required at this
stage
Appendix F, Issue
032: Topic Paper
001: The Plan Area
Appendix A, Issue
003: Soils
Private Individual The respondent wishes for their response that the
maps in Topic Paper 001 are unreadable to be
registered as a formal dispute as in their view “to
carry out a consultation where the evidence is not
readable is not consultation.”
Council considers no
further action is
required at this
stage
Appendix F, Issue
032: Topic Paper
001: The Plan Area
Savills (on behalf of
Dupplin Estate)
The respondent wishes their comments to be
registered as a formal dispute due to “the
datasets…taking averages across the region.  This
masks the disparity within the region and risks failing
to tackle a lack of skills innovation and employment
for the younger workforce.”
Council considers no
further action is
required at this
stage
Appendix F, Issue
032: Topic Paper
001: The Plan Area
Chapter 2, Economic
Characteristics,
pages 32-37
Savills (on behalf of
Scone Estate)
The respondent wishes for their comments to be
registered as a formal dispute on the basis of
population density.  They consider that 
 The Council must consider data sources regarding
population density and use this to seek a more
balanced spread of the population to support
growth in rural settlements and housing clusters
to revitalise rural areas with supportive planning
policies and generous housing allocations.
Council considers no
further action is
required at this
stage
Appendix F, Issue
032: Topic Paper
001: The Plan Area
Appendix C, Issue
017: Homes
Appendix E, Issue
028: Tourism

Page 159

159
Evidence Report
Issue
Appendix
and Issue Respondent Issue Disputed Dispute Status Document
Reference
 Planning policies must be geared towards
supporting tourism businesses, such as Scone
Estate, to survive and expand.  
 The significance of the tourism sector to Perth
and Kinross must be understood and reflected in
planning policy.
SEPA The respondent indicated that they wish for their
comments to be registered as a formal dispute for
the following reasons:  
 LDP Guidance (para. 83) states that the Evidence
Report (ER) should include a proportionate
summary of the baseline data and information,
and that the ER is expected to include spatial
information, such as baseline mapping which
supports an understanding of the place(s), its
characteristics and needs, and Regulation 9 of the
2023 Regulations states that planning authorities
should have regard to any River Basin
Management Plan in preparing the LDP, and that
data on key pressures available from the Water
Environment Hub should inform the
environmental baseline of the ER along with the
most recent water classification data available
from Water Classification Hub
 The Water Environment Hub data may highlight
pressures in the water environment which the
LDP could help address through identification of
opportunities to improve the water environment
in nature network/blue green infrastructure
mapping or in proposed development.  
Council considers no
further action is
required at this
stage
Appendix F, Issue
032: Topic Paper
001: The Plan Area
Chapter 2,
Environmental
Characteristics,
pages 38-40
Core Doc Refs:
CD097 – CD99

Page 160

160
Evidence Report
Issue
Appendix
and Issue Respondent Issue Disputed Dispute Status Document
Reference
 The respondent’s position could be reviewed if
written confirmation is received that the most
recent RBMP data from Water Classification Hub
will be used to inform the environmental baseline
prior to submission to the Gate Check.

Page 161

161
SUSTAINABLE PLACES

Page 162

162
SUSTAINABLE PLACES
5.2.1 The issues covered under the NPF4 theme Sustainable Places are:
 001: Tackling the Climate and Nature Crises (including Climate
Mitigation and Adaptation) 
 002: Biodiversity and Natural Places (Including Landscapes)
 003: Soils
 004: Forestry, Woodland and Trees
 005: Historic Assets and Places
 006: Green Belts
 007: Brownfield, Vacant and Derelict Land and Empty Buildings
 008: Coastal Development and Aquaculture
 009: Energy, Heating and Cooling
 010: Zero Waste
5.2.2 A full summary of the review of evidence undertaken for all issues
under this theme, including all relevant links to that evidence, and a
summary of stakeholder engagement, have been provided under
Appendix A to this Report.  To save duplication in the re-reporting
of that information, the pages to follow concentrate instead on
providing an overview of the identified gaps, uncertainties or key
issues in the evidence gathered, and a summary of agreements,
and/or disputes related to the evidence which were received
through our programme of participation and engagement reported
under Chapter 3.

Page 163

163
ISSUE 001: TACKLING THE CLIMATE AND NATURE CRISES
Links to Evidence:
LDP SPATIAL STRATEGIES
Part 1 of National Planning Framework 4 contains six Spatial Principles
(Core Doc Ref: CD 003)
Perth and Kinross Local Development Plan 2 (2019) (Core Doc Ref: CD 025)
GHG EMISSIONS AND LIFECYCLE ASSESSMENTS
National Planning Framework 4 – lifecycle greenhouse gas emissions:
assessment findings (Core Doc Ref: A001_CD 001)
ESPON – Quantitative Greenhouse Gas Assessment tool for Spatial
Planning (Core Doc Ref: A001_CD 002)
Department of Business, Energy, and Industrial Strategy (DESNZ) Data
2022(Core Doc Ref: A001_CD 003)
The Scottish Government, Climate Change (Emissions Reduction Targets)
(Scotland) Act 2024 (Core Doc Ref: A001_CD 004)
ADAPTATION AND MITIGATION, AND ACHIEVING NET ZERO AND A JUST
TRANSITION
A Changing Climate – Scotland and Perth and Kinross
Adaptation Scotland website (Core Doc Ref: A001_CD 005)
ARUP, Perth and Kinross Climate Risk and Opportunity Assessment
Technical Report, August 2023 (Core Doc Ref: A001_CD 006) and Perth and
Kinross Climate Change Risk and Opportunity Assessment Executive
Summary, June 2023 (Core Doc Ref: A001_CD 007)
Intergovernmental Panel on Climate Change (IPCC) (Core Doc Ref: A001_CD
008)
PKC Climate Change Projection Maps (Core Doc Ref: A001_CD 009)
Our Changing Nature
The State of Nature Partnership,  State of Nature Report 2023 (Core Doc
Ref: A001_CD 0010)
Tackling the Climate and Nature Crises
Scottish Government, Scottish National Adaptation Plan 2024 - 2029(Core
Doc Ref: A001_CD 011)
The Scottish Government, Update to the Climate Change Plan 2018 – 2032:
Securing a Green Recovery on a Path to Net Zero (Core Doc Ref: A001_CD
012)
The Scottish Government, Scottish Biodiversity Strategy to 2045 – Tackling
the Nature Emergency in Scotland (Core Doc Ref: A001_CD 013)
The Scottish Government, Scottish Biodiversity Strategy Post-2020: A
Statement of Intent, December 2020 (Core Doc Ref: A001_CD 014)
Nature Scot, Climate Change and Nature Information Sheet (Core Doc Ref:
A001_CD 015)
Perth and Kinross Council, Climate Change Strategy and Action Plan,
December 2021(Core Doc Ref: A001_CD 016)
Perth and Kinross Council Climate Action website (Core Doc Ref: A001_CD
017)
Perth and Kinross Council, Climate Change Year 3 Annual Report, October
2023 - September 2024 (Core Doc Ref: A001_CD 018)
Perth and Kinross Council, Consultation Draft Mobility Strategy (Core Doc
Ref: A001_CD 019)
Tactran, Regional Transport Strategy 2024-2034 (Core Doc Ref: A001_CD 020)
James Hutton Institute (JHI), Carbon Sequestration Study of Perth and
Kinross Council Area, December 2021 (Core Doc Ref: CD 035)
UK Climate Change Committee(UKCCC), Progress in reducing emissions in
Scotland – 2023 Report to Parliament (March 2024) (Core Doc Ref: A001_CD
021)

Page 164

164
Vulnerability to Climate Change Risks within Perth and Kinross
Scottish Index of Multiple Deprivation (2020)(Core Doc Ref: A001_CD 022)
SEPA National Flood Risk Assessment (NFRA) (Core Doc Ref: A001_CD 023)
Tay District Local Flood Risk Management Plan (Core Doc Ref: A001_CD 024)
Forth District Local Flood Risk Management Plan (Core Doc Ref: A001_CD
025)
Forth Estuary Local Flood Risk Management Plan (Core Doc Ref: A001_CD
026)
Tay Estuary and Montrose Basin Local Flood Risk Management Plan (Core
Doc Ref: A001_CD 027) 
Scotland Wetland Inventory (Core Doc Ref: A001_CD 028)
Perth and Kinross Council, Air Quality Webpages (Core Doc Ref: A001_CD
029)
Scottish Household Survey (SHS) Environment Statistics 2022 (Core Doc Ref:
A001_CD 030)
Scottish Household Survey (SHS) Environment Statistics 2023 (Core Doc Ref:
A001_CD 031)
Taylor McKenzie Research and Marketing Ltd, Tactran Quantitative
Research, October 2023 (Core Doc Ref: A001_CD 032)
Climate Just, Neighbourhood Flood Vulnerability Index (Core Doc Ref:
A001_CD 033)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix A to this Evidence Report.  Chapter 6 of this Report
also provides an overview of the main issues of relevance to the
development of LDP3.
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue, it was
identified that:
 PKC Climate Change Strategy and Action Plan - There is currently not a
full suite of data sources available to allow the comprehensive
monitoring of some of the Key Performance Indicators identified for the
different thematic areas of the Action Plan.  This is due a lack of suitable
data availability or up to date information not yet being available
relating to some of the actions under the Business and Industry (tourism
businesses and Green Certification Scheme, and % of businesses with
250+ employees or largest energy demand with carbon emissions
reduction targets), Land Use (lack of or limited data on area of peatland
restored, and % of local and major planning consents which contain
approvals for biodiversity net gain), and Resilience (up to date RAG
(Red, Amber, Green) status of flood risk management actions) themes.  
As the Scottish Government has not yet released the Perth and Kinross
1990 baseline for either the full suite of GHG emissions or CO2
emissions, a Perth and Kinross target figure for 2030 was estimated for
these two indicators for the purposes of the Perth and Kinross Council
Year 2 Climate Change Annual Report.  The estimate was based on the
presumption that Perth and Kinross would follow the Scottish trends
between 1990 and 2005 when data first became available.

Page 165

165
 JHI, Carbon Sequestration Study of Perth and Kinross Council Area,
December 2021 – The Sequestration Study project report notes some
uncertainty in the data defining peatland, its status, and lack of robust
data on monitoring of peatland restoration sites make estimates of
timescales for the restoration of these sites inappropriate at present.
In terms of woodland expansion potential, the project report identifies
significantly higher levels of carbon sequestration potential from the
planting of Production Sitka Spruce, and lower from the expansion of
Native Broadleaf (after 25 years).  It is important to remember the
national objective of expanding native woodlands, and policy of planting
the right tree in the right place.  As such, it is most likely that a mixed
approach to planting will be the most appropriate one in reality.  This
will be explored further via the Council’s Forest and Woodland Strategy
review.
 Scottish Government, Local Development Plan Guidance, May 2023 -
The Council currently has no data available in relation to technological
sinks and stores as suggested for inclusion under the guidance.
 Scotland Wetland Inventory - The Scottish Government’s Spatial Data
website notes, with respect to the Scotland Wetland Inventory that the
“data set has been developed by assimilating spatial data from Scottish
Natural Heritage.  The whole country has not yet been surveyed and as
a result the data set only displays known wetlands.  The wetland
inventory database comprises a number of fields that include the main
WFD95 wetland type, the original habitat survey information and
whether the wetland polygon is within a statutory designated site.  The
wetland typology (WFD95) is used as the main identifying field for each
polygon in the inventory database. …It is important to note that if there
are no wetlands identified on the inventory this does not mean that
there are no wetlands in that area. The inventory has been completed
using available digital data for wetlands that have been surveyed. It is
very likely that there are wetlands in Scotland that have not been
surveyed or where the survey data is currently not available in a digital
format suitable for GIS.”
In the development of our LDP3 Spatial Strategy, and the spatial
frameworks for other associated strategies and work areas e.g. the
Forest and Woodland Strategy, Nature Networks, natural flood risk
management, peatland restoration etc., it will therefore be important
to engage with our key agencies (SEPA and Nature Scot) and other
relevant stakeholders to identify, where possible, wetland areas which
have not yet been surveyed or for which survey data is not available
digitally.

Page 166

166
Statements of Agreement and/or Dispute:
18 responses were received on our Tackling the Climate and Nature Crises
Topic Paper.  Most respondents (14 out of 18) either agreed with or had no
comment to make on the evidence identified through Topic Paper 004, and
the summary of the implications of that evidence for the Proposed Plan
provided by the Council, or they offered examples of additional sources of
information which they felt should be considered.   There was 1 response
on the issue which the respondent wished to be treated as a formal
dispute to the Evidence Report.  A breakdown of those responses grouped
under stakeholder categories is provided below, and a full summary of
these comments, their status, and the Council’s response in the relevant
table under the Tackling the Climate and Nature Crises issue 001 in
Appendix A.
 Key Stakeholders:
o Nature Scot, neither agreed nor disagreed
o SEPA, agreed
o Historic Environment Scotland, agreed
o Tactran, neither agreed nor disagreed
o Scottish Water, agreed
 Community Councils: 2 responses, 1 agreed, and the other neither
agreed nor disagreed.
 Public At Large: 5 responses, 2 of which agreed, 2 neither agreed nor
disagreed, the other disagreed but does not wish to register as a formal
dispute.
 Landowners and Agents: 5 responses, 3 of which neither agreed nor
disagreed, 1 disputed the evidence but did not wish for their comments
to be recorded as a formal dispute (Savills on behalf of Dupplin Estate),
and 1 (Holder Planning on behalf of SSE Renewables) disputed the
evidence and wish for their comments to be registered as a formal
dispute due to the omission of the Onshore Wind: Policy Statement
2022.
 Other Bodies:
o Homes for Scotland, disagreed but does not wish to register as a
formal dispute.
o SSEN Transmission, agreed

Page 167

167
ISSUE 002: BIODIVERSITY AND NATURAL PLACES (INCLUDING
LANDSCAPES)
Links to Evidence:
Perth and Kinross Council Corporate Plan 2022-2027 (Core Doc Ref: CD027)
Big Place Conversation results webpage  (Core Doc Ref: CD016)
Landscape
Local Landscape Areas (Core Doc Ref: A002_CD001)
SiteLink: National Parks (Core Doc Ref: A002_CD002)
SiteLink: Special Qualities of the National Scenic Areas(Core Doc Ref:
A002_CD003)
NatureScot (2014) Wild Land Areas Map and Descriptions(Core Doc Ref:
A002_CD004)
NatureScot (2023) Assessing impacts on Wild Land Areas – technical
guidance (Core Doc Ref: A002_CD005)
Naturescot (2019)  Landscape Character Types (Core Doc Ref: A002_CD006)
Historic Environment Scotland: Gardens and Designed Landscapes
Inventory (Core Doc Ref: A002_CD007)
Geodiversity
SiteLink: GCRs, SSSIs (geodiversity and mixed) (Core Doc Ref: A002_CD008)
Proposed Local Geodiversity Sites (Core Doc Ref: A002_CD009)
Scottish Geology Trust GeoSites Project (Core Doc Ref: A002_CD010)
Biodiversity, Protected Areas and Species: 
Tayside Biodiversity Partnership (2016) Local Biodiversity Action Plan (Core
Doc Ref: A002_CD011)
SiteLink: International and National Protected Sites (Core Doc Ref:
A002_CD012)
Candidate Local Biodiversity Sites (Core Doc Ref: A002_CD013)
Scottish Biodiversity List (Core Doc Ref: A002_CD014)
NBN Atlas (Core Doc Ref: A002_CD015)
UK Centre for Ecology and Hydrology (2022,2023) Lochs and Climate
Change Research (Core Doc Ref: A002_CD016)
NatureScot (2017) Loch Leven Nutrient Load and Source Apportionment
Study (Core Doc Ref: A002_CD017)
SEPA Water Classification Hub (Core Doc Ref: A002_CD018)
Perth and Kinross Council, Statutory Biodiversity Duty: Perth and Kinross
Council Report on Delivery January 2021 to December 2023 (Core Doc Ref:
A002_CD057)
Nature Networks, Compensation and Enhancement:
Scottish Government (2024) Scottish Biodiversity Strategy to 2045: tackling
the nature emergency (Core Doc Ref: A001_CD019)
Strategic Biodiversity Framework Delivery Plan 2024-2030(Core Doc Ref:
A002_CD020)
State of Nature Partnership (2023) State of Nature Scotland Report(Core
Doc Ref: A002_CD021)
NatureScot (2023) Nature Networks Framework (Core Doc Ref: A002_CD022)
Nature Scot (2024) Practitioner’s Guide to Nature Networks (Core Doc Ref:
A002_CD023)
PKC (2024) Engagement Results (Core Doc Ref: A002_CD024)
PKC (2020) Forest and Woodland Strategy (Core Doc Ref: A002_CD025)
PKC (2022) Planning for Nature (Core Doc Ref: A002_CD026)

Page 168

168
PKC (2024) National Planning Framework 4: Policy 3 Biodiversity and
Development: A Guidance Note (Core Doc Ref: A002_CD027)
NatureScot Nature Networks Toolbox (Core Doc Ref: A002_CD028)
AECOM Strategic Corridors Maps (Core Doc Ref: A002_CD029)
AECOM Wildlife Connectivity and Opportunity Maps (Core Doc Ref:
A002_CD030)
AECOM Eco-uplift Nature Recovery Portal (Core Doc Ref: A002_CD031)
NatureScot (2022) Habitat and Land Cover Map of Scotland Eunis 2(Core
Doc Ref: A002_CD032)
Existing Nature Rich Sites and networks
o Protected sites (see Map 3 at end of Issue paper A02)
o Candidate Local Biodiversity Sites (see Map 3 at end of Issue paper
A02)
o SEPA Wetlands Inventory (Core Doc Ref: A002_CD033)
o Plantlife Important Plant Areas (Core Doc Ref: A002_CD034)
o RSPB Important Bird Areas (Core Doc Ref: A002_CD035)
o Ancient Woodland Inventory (Core Doc Ref: A002_CD036)
o Native Woodland Survey of Scotland (Core Doc Ref: A002_CD037)
o Forest Research (20232) GB National Forest Inventory (Core Doc Ref:
A002_CD038)
o Buglife B Lines (Core Doc Ref: A002_CD039)
o SNH (1996) An Inventory of Lowland Raised Bogs in Britain (Core Doc
Ref: A002_CD040)
o SNH (2016) Carbon and Peatland Map (Core Doc Ref: A002_CD041)
o Butterfly Conservation Priority Butterfly Records (in house data)
Existing Restoration Projects 
o Riverwoods Projects
o Nature Restoration Funded Projects
o Northwoods Rewilding Network
o Peatland Action projects (Core Doc Ref: A002_CD042)
o Biodiversity Villages
o Wildlife Accredited Estates
o Scottish Forestry Native Woodland grants
o SEPA Water Environment Framework Projects (Core Doc Ref:
A001_CD043)
o NatureScot(2023) Mountain Woodland Restoration Sites (Core Doc
Ref: A001_CD044)
Opportunities, Degraded Land and Constraints
o Loch Leven LENS
o Natural Flood Management Studies 
o Invergowrie FPS and NFM report (Core Doc Ref: CD029)
o Comrie Flood Protecon Scheme Feasibility Report (Core
Doc Ref: CD034)
o Aberfeldy Flood Study Feasibility Report (Core Doc Ref:
CD030)
o Alyth NFM Report (Core Doc Ref: CD031)
o Blackford Flood Study (Core Doc Ref: CD032)
o South Kinross NFM (Core Doc Ref: CD033)
o PKC (2025) Strategic Flood Management Assessment (Core Doc Ref:
CD026)
o SEPA Riparian Vegetation Planting Opportunities (Core Doc Ref:
A002_CD045)
o SEPA Recommended Riparian Corridor (Core Doc Ref: A002_CD046)
o SEPA Geomorphic Risk Buffer (Core Doc Ref: A002_CD047)
o SEPA River Recovery Potential (Core Doc Ref: A002_CD048)
o SEPA Obstacles to Fish Migration (Core Doc Ref: A002_CD049)
o SEPA Flood Hazard Maps (Core Doc Ref: A002_CD050)

Page 169

169
o SEPA (2021) River Basin Management Plan for Scotland (Core Doc
Ref: A002_CD051)
o SEPA Water Classification Hub (Core Doc Ref: A002_CD052)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix A to this Evidence Report.  Chapter 6 also provides
an overview of the main issues of relevance to the development of LDP3. 
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue, it was
identified that:
 Landscape and Geodiversity - General experience of landscape such
as those addressed in LDP2 Policy 39 are not covered by the data
sources given above.  NPF4 does not contain a landscape policy, and
it receives limited consideration in the Six Qualities of Successful
Places.  Perth and Kinross communities have a strong relationship
with their surrounding landscape regardless of official designations. 
The importance of continuing a localised landscape policy along the
lines of Policy 39 will need to be explored with communities during
Proposed Plan preparation.  The Place Standard Tool used during the
Big Place Conversation primarily asks about access to nature and
although comments were received on the value of the surrounding
nature to residents, the experience of specific landscapes within and
outwith settlements received less information.  Further engagement
on specific landscape importance to settlements will take place as
part of engagement in preparation of the Proposed Plan.
NPF4 Policy 11 Energy, together with Policy 1, gives significant
weight to the priority of delivering renewable energy including where
local landscape designations are identified.  Landscapes in the Perth
and Kinross area are of significant value locally and regionally.  There
will need to be consideration given to how effective local landscape
areas are, and whether landscapes need greater protection through
continuation of a separate landscape policy in LDP3.
There is currently no policy which covers Geological Conservation
Review (GCR) sites in NPF4 or LDP2.  GCRs that are not already SSSIs,
or parts excluded from designation, have been reviewed as part of
the Local Geodiversity Sites programme.  In some instances, the
entirety of the GCR (or remainder) has not met Local Geodiversity
Site standard. Whether remaining GCR should be protected through
policy because of its original designation will be addressed in
preparation of the Proposed Plan. 
The Council has assessed all proposed Local Geodiversity Sites,
landowner feedback and adoption to be completed by July 2026. 
Sites will be adopted in time for the Proposed Plan consultation and
to be incorporated into associated work.
 Protected Areas and Species - The status of protected areas is
subject to the capacity of Nature Scot to complete assessments.

Page 170

170
Currently, many of these assessments are out of date, as a result not
all protected areas are still of the quality of the last assessment, or
the qualifying features may no longer be relevant or other valuable
features may be present.  Three existing protected areas have
specific policies and guidance.  Whether the policy regarding these
areas needs to be reviewed or additional areas also addressed will
depend on an analysis of whether the current summary condition
assessment of these sites is reliable.
The Loch Leven source apportionment study was due to be refreshed
in 2025 but subject to funding will now be carried out in 2026 with
results due April 2026. The final report may not be available to fully
inform the LDP3 preparation stage.  As the latest assessment of the
eutrophic loch feature remains “vulnerable recovering” a
precautionary approach will be taken if timelines do not coincide.
.  
Protected species information and trends at a national level are not
collated at Council level.  Perth and Kinross are also disadvantaged by
not having a records centre, although part of Kinross-shire is covered
by Fife Nature as part of the Fife and Kinross vice county. 
The Tayside Biodiversity Partnership Local Biodiversity Action Plan
(LBAP) runs until 2026.  A review of the LBAP is currently underway
and will coincide with preparation of the Proposed Plan.  We will
work closely with the partnership to ensure the Proposed Plan and
Nature Networks are complementary to the ambitions of the
forthcoming LBAP.
The Local Biodiversity Sites programme will not be complete until
early 2026, with adoption expected in autumn of that year.  Sites will
be adopted in time for the Proposed Plan consultation and to be
incorporated into associated work.  However, this may impact the
early development of Nature Networks.
 Nature Networks, Compensation and Enhancement - Nature
Networks are a new feature with tools only recently developed. 
Several potential opportunities and constraints are identified in the
sources reviewed for this issue 002 in Appendix A, but further
engagement is ongoing to identify additional nature rich sites,
restoration projects, local priorities and opportunities to ensure best
value is delivered from the final Nature Network that is delivered as
part of LDP3.  A collaborative approach to developing these networks
is taking place in partnership with the Perth and Kinross Countryside
Trust through their Perthshire Nature Connections Partnership,
which is running throughout 2025 for landscape scale Nature
Networks.  The identification of draft Nature Networks will be
developed alongside green infrastructure and green network
identification.  This work is expected to be completed early 2026
with further engagement through 2026 alongside plan preparation.
The lack of a biodiversity metric hinders the development of an
approach to ensuring that development is complying with the

Page 171

171
mitigation hierarchy and providing the expected compensation and
enhancement.  Interim guidance has been introduced for applicants.
If the national metric is delivered as proposed in early 2025 it will be
able to inform impacts and uplift opportunities on site allocations. 
A mechanism for offsite biodiversity compensation and
enhancement.  There are established principles for delivery of the
mitigation hierarchy as set out in the Council’s Planning for Nature
Guidance.  Compensation for biodiversity or habitat loss will always
be expected onsite except in limited and justified circumstances.
Scottish Government guidance on NPF4 Policy 3 also expects onsite
delivery of biodiversity enhancement in the first instance.  In limited
justified circumstances where onsite enhancement is not possible an
offsite solution for securing NPF4 requirements may be required. 
Engagement carried out in Summer 2024 has provided an indication
of the preferred direction for how offsite compensation and
enhancement will be secured and is reflected in interim guidance. 
The engagement will inform the development of local policy for LDP3
but currently Planning Circular 4/1998 for conditions and Planning
Circular 3/2012 for planning obligations present a level of
uncertainty for mechanisms to secure enhancement and offsite
measures where the land is not under the control of the applicant.

Page 172

172
Statements of Agreement and/or Dispute:
16 responses were received on our Biodiversity and Natural Places Topic
Paper.  Most respondents (11 out of 16) either agreed with or did not
disagree with the evidence identified through Topic Paper 005, and the
summary of the implications of that evidence for the Proposed Plan
provided by the Council, although some provided some suggestions for
consideration or additional comments.  There were 2 responses which the
respondents wished to be treated as a formal dispute to the Evidence
Report, and 3 comments where the respondents indicated that they
disagreed with the evidence but did not wish for their response to be
treated as a formal dispute.   A breakdown of those responses grouped
under stakeholder categories is provided below, and a full summary of
these comments, their status, and the Council’s response in the relevant
table under the Biodiversity and Natural Places issue 002 in Appendix A.
 Key Stakeholders:
o Nature Scot, neither agreed nor disagreed
o SEPA, disagreed but does not wish to register comments as a
formal dispute.  Recommends Strategic Flood Risk Assessment in
the Nature Network mapping, rather than flood maps alone, and
the inclusion of 2021 River Basin Management Plan for Scotland
as important for nature networks.   Also emphasises the
importance of the water environment to nature networks and
requests river corridors are established as a key principle in the
identification of these networks across Perth and Kinross.  
o Scottish Water, agreed
 Community Councils: 3 responses, 1 agreed, and the others neither
agreed nor disagreed.
 Public At Large: 3 responses, 1 agreed, 1 disagreed on the basis that
they do not believe there is a climate or nature crisis, but did not wish
for their comments to be registered as a formal dispute, and the other
disputed the evidence due to the lack of consideration of local
biodiversity, and the negative impact of development on it.
 Landowners and Agents: 6 responses, 3 of which neither agreed nor
disagreed, 2 of which agreed, and 1 which disagreed with the summary
of implications of the evidence and would welcome the development of
a biodiversity net gain framework, a future developer contribution
policy and a biodiversity register for offsite enhancement.  However,
they do not wish for their comments to be registered as a formal
dispute to the Evidence Report.
 Other Bodies:
o Homes for Scotland disputes the summary of implications of the
evidence for this issue to the Proposed Plan, specifically in relation
to the protection of natural assets, namely local landscapes, risks
to the water environment, and removal of trees or woodland, and
comments that NPF4 Policy 4 states that the plan should not
restrict development from happening completely, but allows for
developments which align with Policy 4 due to socio-economic
benefits of building homes.

Page 173

173
ISSUE 003: SOILS
Links to Evidence:
Soil and Habitat Types/Characteristics
National Soil Map of Scotland (Core Doc Ref: A003_CD01)
Soil map of Scotland (partial cover) | Scotland's soils
(environment.gov.scot) (Core Doc Ref: A003_CD02)
Habitat Map of Scotland | Scotland's environment web(Core Doc Ref:
A003_CD03)
Carbon Rich Soils, Peatland and Priority Peatland Habitat
Carbon and peatland 2016 map | Scotland's soils (environment.gov.scot)
(Core Doc Ref: A003_CD04)
James Hutton Institute (JHI) - Carbon Sequestration Study (2021) [Core Doc
Ref: CD35]
Peatland Action - Peat Depth, Scotland's Soils (Core Doc Ref: A003_CD05)
Land Capability for Agriculture
Land Capability for Agriculture Map (partial cover) (Core Doc Ref:
A003_CD06)
Soil Risk Maps
Soil Risk Maps(Core Doc Ref: A003_CD07)
Map of Subsoil Compaction Risk (partial cover) (Core Doc Ref: A003_CD08)
Map of Topsoil Compaction Risk (partial cover) (Core Doc Ref: A003_CD09)
Map of Soil Erosion Risk (partial cover) (Core Doc Ref: A003_CD010)
Map of Runoff Risk (partial cover) (Core Doc Ref: A003_CD011)
The following datasets were considered during the Topic Paper
consultation in relation to “land of lesser quality that is culturally or locally
important” but are not included as part of the Evidence Report:
Historic Environment Scotland CANMORE record on ‘agricultural cropmark’
sites – Perth and Kinross Council(Core Doc Ref: A003_CD012)
Perth and Kinross Council Mapped Local Community Growing
Initiatives(Core Doc Ref: A003_CD013)
Wetlands - Scotland's Environment Web(Core Doc Ref: A003_CD014)
Natural Flood Management Maps(Core Doc Ref: A003_CD015)
Land Capability for Forestry(Core Doc Ref: A003_CD016)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue 003, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix A to this Evidence Report.  Chapter 6 also provides
an overview of the main issues of relevance to the development of LDP3. 
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue, it was
identified that key issues in relation to carbon rich soils and prime
agricultural land are underpinned and guided by existing, national
datasets, as noted under the summary of evidence in Appendix A Issue
003.  Site surveys can support the detailed consideration of:
• Carbon rich soils, peatland, and priority peatland habitat, and

Page 174

174
• Prime agricultural land
This information can support the assessment of sites for potential
allocation as well as part of the determination of planning applications.
Several consultation responses received on Topic Paper 006: Soils have
identified that site information can supplement the consideration of soils
including carbon rich soils and prime agricultural land.
Soil risk maps further support the consideration of development in relation
to protecting existing soils as well as minimising/avoiding impacts from
new development.
There is no nationally consistent methodology for identifying land of lesser
quality that is culturally or locally important for primary use.  Following
stakeholder engagement on this matter, it is not intended to proceed with
designating land under this classification.
Statements of Agreement and/or Dispute:
10 responses were received on our Soils Topic Paper.  Most respondents (9
out of 10) either agreed with or did not disagree with the evidence
identified through Topic Paper 005, and the summary of the implications of
that evidence for the Proposed Plan provided by the Council, although
some provided suggestions for consideration or additional comments. 
There was 1 response which the respondents wished to be treated as a
formal dispute to the Evidence Report.   A breakdown of those responses
grouped under stakeholder categories is provided below, and a full
summary of these comments, their status, and the Council’s response in
the relevant table under the Soils issue 003 in Appendix A.
 Key Stakeholders:
o Nature Scot, neither agreed nor disagreed
o Historic Environment Scotland, agreed
o Scottish Water, agreed
 Community Councils: 2 responses, 1 agreed, and the other neither
agreed nor disagreed.
 Public At Large: No comments received.
 Landowners and Agents: 4 responses, 2 of which neither agreed nor
disagreed, 1 of which agreed, and 1 (Savills on behalf of Scone Estate)
which disputed the list of evidence/datasets reviewed under the Soils
Topic Paper and the summary of implications for the Proposed Plan
provided, on the basis that there should be recognition that the
designation of Prime Agricultural Land on the National Scale Land
Capability for Agriculture map and the Land Capability for Agriculture
(partial cover) map provides information which is ultimately broad in
scope and cannot be relied upon at the local level without further
specific inspections of the sites concerned. 
 Other Bodies:  1 response was received from Homes for Scotland who
neither agreed nor disagreed with the summary of evidence and/or
implications for the Proposed Plan.

Page 175

175
ISSUE 004: FORESTRY, WOODLAND, AND TREES
Links to Evidence:
Perth and Kinross Council Corporate Plan 2022-2027 (Core Doc Ref:
A004_CD01)
The UK Forestry Standard (UKFS) (Core Doc Ref: A004_CD02)
Scotland's Forestry Strategy 2019-2029, Scottish Government(Core Doc Ref:
A004_CD03)
Scotland's Forestry Strategy Implementation Plan 2022-2025, Scottish
Government(Core Doc Ref: A004_CD04)
Scottish Forestry, The Right Tree in the Right Place: Planning for Forestry
and Woodlands(Core Doc Ref: A004_CD05)
2020 Challenge for Scotland’s Biodiversity - A Strategy for the conservation
and enhancement of biodiversity in Scotland, Scottish Government(Core
Doc Ref: A004_CD06)
NFI Woodland Ecological Condition Assessment Methodology, Forest
Research(Core Doc Ref: A004_CD07)
The Scottish Government's Policy on Control of Woodland Removal,
Forestry Commission Scotland (Core Doc Ref: A004_CD08)
Scottish Water Sustainable Land Management (Core Doc Ref: A004_CD09)
Scottish Water Guidance on Forestry Activities near Scottish Water Assets,
September 2017(Core Doc Ref: A004_CD010)
National Forest Inventory (NFI), Forest Research(Core Doc Ref: A004_CD011)
Native Woodland Survey of Scotland (NWSS), Scottish Forestry(Core Doc
Ref: A004_CD012)
Ancient Woodland Inventory (AWI), NatureScot(Core Doc Ref: A004_CD013)
The Woodland Trust Ancient Tree Inventory (ATI) (Core Doc Ref:
A004_CD014)
Scotland's National Forests and Land (Core Doc Ref: A004_CD015)
Perth and Kinross Council (PKC) Interactive Heritage Map(Core Doc Ref:
A004_CD016)
Historic Environment Scotland’s Portal(Core Doc Ref: A004_CD017)
Scottish Forestry Map Viewer, Scottish Forestry(Core Doc Ref: A004_CD018)
Public Registers, Scottish Forestry(Core Doc Ref: A004_CD019)
National scale Land Capability for Forestry Map (Core Doc Ref: A004_CD020)
Nature Scot, Carbon and Peatland Map (2016) (Core Doc Ref: A004_CD021)
Perth and Kinross Council Forest and Woodland Strategy (2020) (Core Doc
Ref: A004_CD022)
JHI Carbon Sequestration Study of the Perth and Kinross Area (December
2021) [Core Doc Ref: CD1]
Perth and Kinross Council Draft Climate Emergency Report and Action Plan
(2019) - Public Engagement Survey(Core Doc Ref: A004_CD023)
Perth and Kinross Council Planning Enforcement Charter 2024(Core Doc Ref:
A004_CD024)
Perth and Kinross Council LDP3 Big Place Conversation (Core Doc Ref:
A004_CD025)
Perth and Kinross Council Tay Forest National Park Bid(Core Doc Ref:
A004_CD026)
Perth and Kinross Council Tay Forest National Park Bid - Consultation
Analysis report(Core Doc Ref: A004_CD027)

Page 176

176
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue 006, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix A to this Evidence Report.  Chapter 6 also provides
an overview of the main issue of relevance to the development of LDP3. 
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue, it was
identified that:
 Existing Forestry, Woodland and Trees within Perth and Kinross - No
single dataset provides a comprehensive overview of all trees and
woodland of high biodiversity value within Perth and Kinross.  The
Native Woodland Survey of Scotland, the Scottish Ancient Woodland
Inventory, the Ancient Tree Inventory, and Tree Preservation Orders
combined provides the best available information.  Although smaller
scale woodlands, tree belts and hedgerows may be omitted.  More
detail on the limitations of specific datasets is outlined below.
o The National Forest Inventory (NFI) covers all forest and woodland
over 0.5 Hectares, with a minimum of 20% canopy cover, or the
potential to achieve it, and a minimum width of 20 metres.  As
such, smaller woodlands, tree belts and hedgerows may not be
included, and where relevant should be picked up via more place
specific studies such as our Locality Profile work, assessment of
individual site proposals, and work related to identifying habitat
and nature networks.
o The Ancient Woodland Inventory (AWI) is a provisional guide to
the location of Ancient Woodland.  It contains three main
categories of woodland, all of which are likely to be of value for
their biodiversity and cultural value by virtue of their antiquity. 
The AWI was derived from the Roy maps (c1750) and the OS 1st
edition (c1860).  It is not definitive and should be used with care. 
Nature Scot advise that when evaluating woods it is important to -
examine the site on the ground, looking for archaeological,
biological and other indicators of antiquity and of its current
biodiversity value; examine old maps (woods not shown on the
AWI, but present on the historic maps, are likely to be ancient and
should be treated as such unless evidence is available to the
contrary), and to seek specialist advice if in doubt.  It is proposed
that we will follow these additional steps in identifying ancient
woodland within the Perth and Kinross Area as part of our LDP3
Spatial Strategy and the review of our Forest and Woodland
Strategy.   
o The Ancient Tree Inventory (ATI) maps ancient, veteran, and
notable trees in the UK managed by the Woodland Trust.  Data is
often supplied by members of the public but is verified by local
recorders, as such although it is publicly available, it needs
enhancement via citizen engagement.  Engagement will be carried
out as part of the development of our Proposed Plan and revised
Forest and Woodland Strategy, and we will seek further

Page 177

177
information from the public and key stakeholders in respect of
ancient trees identified on the ATI.
o The Council’s Interactive Heritage Map provides information
about tree groups, tree lines, and individual trees that are
protected through a Tree Preservation Order (TPO), and those
within a Conservation Area.   TPO’s are primarily located in
settlements, with less in the rural countryside areas.  The
Council’s TPO’s require a review to ensure the records remain up-
to-date and relevant and will be prioritised as part of the
development of our LDP3 Proposed Plan.
 Forestry and Woodland Creation –
o Whilst for the most part still relevant, the Council’s Forest and
Woodland Strategy (FWS) is currently under review to ensure that
it is fully aligned with the National Strategy and meets the
expectations and requirements of National Planning Framework 4. 
It is not anticipated that the outcomes of this review will lead to
significant changes to the existing Strategy, as much of the data
used to inform its development has not really changed.  However,
a review will ensure any changes at a national level in terms of
outcomes, priorities and policy drivers are reflected, and that it is
up to date in line with the requirements of the Planning Act,
particularly in relation to the protection of woodlands of high
nature conservation value, their resilience to a changing climate,
and the multiple benefits which they can offer.  A draft version of
the FWS review is anticipated to be published for consultation
early May 2026, following consideration at Economy &
Infrasturcture Committee.  A final approved version of the
Strategy is expected late Summer 2026. 
o The James Hutton Institute (JHI) Carbon Sequestration Study
focused on the sectors of land-based industries and natural
resources, and how these can be considered when looking at the
carbon resources of the area, and its potential for sequestering
carbon or reducing greenhouse gas emissions.  In terms of
woodland expansion potential, the project report identifies
significantly higher levels of carbon sequestration potential from
the planting of Production Sitka Spruce, and lower from the
expansion of Native Broadleaf (after 25 years).  It is important to
remember the national objective of expanding native woodlands,
and policy of planting the right tree in the right place.  As such, it
is most likely that a mixed approach to planting will be the most
appropriate one.  The project report also includes limited data on
species resilience to the effects of a changing climate.  It is
proposed that we explore with Forestry Scotland and Forest
Research the information they hold regarding species resilience to
address this gap in the JHI Study.

Page 178

178
Statements of Agreement and/or Dispute:
13 responses were received on our Forestry, Woodland and Trees Topic
Paper.  Most respondents (10 out of 13) either agreed with or had no
comment to make on the evidence identified through Topic Paper 007, and
the summary of the implications of that evidence for the Proposed Plan
provided by the Council, or offered suggestions regarding the
interpretation of NPF4 policies, or examples of additional sources of
information which they felt should be considered.  There was 1 response
on the issue which the respondent wished to be treated as a formal
dispute to the Evidence Report, and 2 comments where the respondents
indicated that they disagreed with the evidence but did not wish for their
response to be treated as a formal dispute.  A breakdown of those
responses grouped under stakeholder categories is provided below, and a
full summary of these comments, their status, and the Council’s response
in the relevant table under the Forestry, Woodland and Trees issue 004 in
Appendix A.
 Key Stakeholders: 
o Nature Scot, neither agreed nor disagreed
o Historic Environment Scotland, agreed
o Scottish Water, agreed
 Community Councils: 2 responses, 1 agreed, and the other neither
agreed nor disagreed.
 Public At Large: 2 responses were received from anonymous
respondents, 1 disagreed with the summary of implications
provided for this issue, and the other disagreed with both the list of
evidence/datasets and the summary of implications for the
Proposed Plan.  Neither party wished for their comments to be
registered as a formal dispute to the Evidence Report.  1 response
was received from a private individual who disputed the list of
evidence/datasets considered and the summary of implications for
the Proposed Plan provided, as in their view the topic paper failed
to represent the actual activities of Perth and Kinross Council in the
arena.
 Landowners and Agents: 4 responses which neither agreed nor
disagreed with the evidence and summary of implications.
 Other Bodies:  A response from SSEN Transmission agreed with the
evidence considered and summary of implications provided but
made suggestions regarding the interpretation of policy in practice.

Page 179

179
ISSUE 005: HISTORIC ASSETS AND PLACES
Links to Evidence:
Perth and Kinross Council Corporate Plan 2022-2027(Core Doc Ref: CD027)
Relevant Historic Environment Policies, Advice and Guidance
Our Past, Our Future: The Strategy for Scotland's Historic Environment
2023 (Core Doc Ref: A005_CD001)
Historic Environment Scotland, Historic Environment Policy for Scotland
(HEPS) 2019 (Core Doc Ref: A005_CD002)
Historic Environment Scotland, ‘Managing Change in the Historic
Environment' (Core Doc Ref: A005_CD003)
Historic Environment Scotland, Talking About Heritage Guide (2022) (Core
Doc Ref: A005_CD004)
Historic Environment Scotland Circular: Regulations and Procedures(Core
Doc Ref: A005_CD005)
The Association of Local Government Archaeological Officers, Guidance for
Peatland Restoration and the Historic Environment in Scotland( Core Doc
Ref: A005_CD006)
Historic Environment Scotland, Poinng the Way to the Future (Core Doc
Ref: A005_CD007)
Historic Environment Scotland, Green Recovery Statement for the Historic
Environment (Core Doc Ref: A005_CD008)
Historic Environment Scotland, A Guide to Climate Change Impacts (Core
Doc Ref: A005_CD009)
Historic Land Use Assessment
Historic Environment Scotland’s Historic Land Use Assessment (HLA) (Core
Doc Ref: A005_CD010)
Perth and Kinross Heritage Trust (PKHT)
Perth City Heritage Fund (PCHF) (Core Doc Ref: A005_CD011)
Community Heritage Grants Scheme.(Core Doc Ref: A005_CD012)
Completed PKHT Projects (Core Doc Ref: A005_CD013)
PKHT Trails, Maps and Leaflets Information(Core Doc Ref: A005_CD014)
Location of Historic Assets and Places
Perth and Kinross Council Interactive Heritage Map (Core Doc Ref:
A005_CD015)
Scottish Government Transforming Planning - Permitted Development(Core
Doc Ref: A005_CD016)
Historic Environment Scotland’s Portal - Listed Buildings (Core Doc Ref:
A005_CD017)
Buildings at Risk Register for Scotland (Core Doc Ref: A005_CD018)
Perth and Kinross Council Historic Environment Record (HER) (Core Doc Ref:
A005_CD019)
Historic Environment Scotland CANMORE record on ‘agricultural cropmark’ sites –
Perth & Kinross Council (Core Doc Ref: A005_CD020)
Other Relevant Sources of Information
Perth and Kinross Council LDP3 Big Place Conversation(Core Doc Ref:
A005_CD021)
Perth and Kinross LDP2 Design Charettes (Core Doc Ref: A005_CD022)
Perth and Kinross Council Placemaking Programme (Core Doc Ref:
A005_CD023)
Aberfeldy Square Regeneration (Core Doc Ref: A005_CD024)
Community Action Plans - Meigle and Ardler (Core Doc Ref: CD037), Stanley
(Core Doc Ref: CD038), Alyth (Core Doc Ref: CD039), Coupar Angus (Core Doc
Ref: CD040) , Dunkeld and Birnam (Core Doc Ref: CD041), Crieff (Core Doc Ref:
CD042) , Blairgowrie and Rattray (Core Doc Ref: CD43), Pitlochry and Moulin

Page 180

180
(Core Doc Ref: CD044) , Muthill and Tullibardine (Core Doc Ref: CD045),
Auchterarder and Aberuthven(Core Doc Ref: CD046), and St. Fillans (Core Doc
Ref: CD047).
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue 005, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix A to this Evidence Report.  Chapter 6 also provides
an overview of the main issues of relevance to the development of LDP3. 
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
The LDP3 Spatial Strategy should reflect the priorities and principles of
‘Our Past, Our Future’ Strategy for Scotland’s Historic Environment 2023. 
The policies contained within the Historic Environment Policy Scotland
should be taken account of and translated into the Plan’s Spatial Strategy
with respect to the historic environment of Perth and Kinross.
PKC will ensure there is early and continued engagement with Historic
Environment Scotland with regards to the development of LDP3 Spatial
Strategy, its SEA and any related historic environment appraisals or
guidance documents.
In reviewing the sources of evidence listed under this issue, it was
identified that:
 Historic Land Use Assessment (HLA) – Historic Environment
Scotland’s HLA is not available for the entire Perth and Kinross
Council Area.  However, it does provide a picture for the most
populated areas. 
 Conservation Area Appraisals (CAA) - At present, Conservation
Area Appraisals (CAA) and guidance are available for 22 out of
those 36 areas.  A rolling programme is in place to review our
Conservation Areas and the list of CAA.  Our approach to this will be
to group areas by location; to prioritise areas where the last
appraisal or review was some considerable time ago; and to
provide an appraisal where none is currently in place. The first
three reviews (Birnam, Dunkeld, and Spittalfield) are to be
considered by Economy and Infrastructure Committee on 28
January 2026. The next Conservation Area Appraisal to being
reviewed will be Perth Central and to be considered by Economy
and Infrastructure Committee at the end of 2026.
 Perth and Kinross Design Charettes - Due to the period of time
which has lapsed since these reports were produced, any data or
statistics contained within them which has since been updated
should be reviewed as part of the LDP3 Locality Profile work.  The
Audit should also consider if progress has been made against the
key issues and actions identified in the charettes, and how those
issues and actions compare to the feedback gathered through the
Big Place Conversation.

Page 181

181
Statements of Agreement and/or Dispute:
10 responses were received on our Historic Assets and Places Topic Paper
1 of which came from a respondent who did not provide their name or
contact details.  60% neither agreed with or nor disagreed with the
evidence and a many provided examples to assess with highlighting the
importance of historic assets and places.  A number offered examples of
additional sources of information which they felt should be considered and
/ or highlighted other potential implications for the Proposed Plan.  1
respondent wished for their comments to be treated as a formal dispute to
the Evidence Report. 
A full summary of these comments, their status, and the Council’s
response are provided in the table relevant table under this issue 005 in
Appendix A.  A breakdown of those responses grouped under stakeholder
categories is provided below.
 Key Stakeholders: 2 responses were received –
o Historic Environment Scotland supplied further information in
respect of Historic Environment designations and casework;
buildings at risk; grants; communities; and tourism and
economy relating to Perth and Kinross, which will be used to
prepare the Proposed Plan.
o Scottish Water neither agree nor disagree with the evidence.
 Community Councils: 2 responses, 1 which agreed with the list of
evidence reviewed and summary of implications for the Proposed
Plan, and 1 which neither agreed nor disagreed. 
 Public At Large: 2 responses were received from members of the
public.  1 response from an individual who was concerned that
some historic environment features could not be seen on the map.
The final response was also from an anonymous individual, they
raise awareness of updates to the Managing Change guidance, 
highlighted the importance of publicity for grants/funding, and
offered comments for a more realistic timetable for conservation
area appraisals.  They did not wish for their comments to be
registered as a formal dispute.
 Landowners and Agents: 2 responses neither agreed nor disagreed
with the list of evidence and the summary of implications for the
proposed Plan. 1 provided further comments highlighting that
discretion, flexibility and a balanced approach will be needed when
appraising proposed developments and emphasised that NPF4
needs to be read and applied as a whole.
 Other Bodies: Perth and Kinross Heritage Trust disagree with the
evidence; additional information is supplied in respect of PKHER;
the ALGAO public benefit; other NPF4 policies that also reference
the Historic Environment. Additional comments raise awareness of
new PKHT guidance documents, and other resources to support the
LDP.

Page 182

182
ISSUE 006: GREEN BELTS
Links to Evidence:
Perth and Kinross Structure Plan Written Statement, June 2003 [Core Doc
ref: CD036]
David Tyldesley and Associates Perth Green Belt Study, June 2000 (Core Doc
Ref: A006_CD001).
LDP 1 Examination Report: Policy NE5 Green Belt (Core Doc Ref:
A006_CD002).
LDP2 SEA – Addendum to the Environmental Report Dec 2017 (Core Doc
Ref: A004_CD003).
LDP2 Examination Report: Policy 41 Green Belt  (Core Doc Ref: A006_CD004).
Perth and Kinross Local Development Plan 2, 2019 (Core Doc Ref:
A004_CD005).
Scottish Vacant and Derelict Land Survey 2023 (Core Doc Ref: CD048).
Nature Scot National Landscape Character Assessment (Core Doc Ref:
A006_CD006)
LDP2 Landscape Supplementary Guidance, 2020 (Core Doc Ref: A006_CD007)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue 006, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix A to this Evidence Report.  Chapter 6 also provides
an overview of the main issues of relevance to the development of LDP3. 
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue, it was
identified that:
 The green belt boundary has already been reviewed though the
preparation of the current LDP2.  It will be necessary, however, to
carry out a further full review in light of the new policy context and
priorities set out in the NPF4, including meeting the finalised
housing and employment land requirements, and the spatial
strategy which is identified for the new LDP.  This will need to be
undertaken prior to the site selection process.
Statements of Agreement and/or Dispute:
12 responses were received on our Green Belts Topic Paper, 2 of which
came from respondents who did not provide their name or contact details.
Just over half of respondents either agreed with or had no comment to
make on the evidence identified through Topic Paper 009: Green Belts, and
the summary of the implications of that evidence for the Proposed Plan
provided by the Council.  A number offered examples of additional sources
of information which they felt should be considered and / or highlighted
other potential implications for the Proposed Plan. There were 4 responses
on the issue which the respondents wished to be treated as a formal
dispute to the Evidence Report and 2 comments where the respondents
indicated that they disagreed with the evidence but did not wish for their
response to be treated as a formal dispute.    
A full summary of these comments, their status, and the Council’s
response are provided in the table relevant table under this issue 006 in

Page 183

183
Appendix A.  A breakdown of those responses grouped under stakeholder
categories is provided below.
 Key Stakeholders:  Nature Scot, did not state whether they agreed or
disagreed, but provided suggestions for regarding including
consideration of nature networks and landscape character under
the summary of implications section for this issue also.
 Community Councils: 2 responses, 1 which agreed with the list of
evidence reviewed and summary of implications for the Proposed
Plan, and 1 which neither agreed nor disagreed. 
 Public At Large: 3 responses were received on the Green Belt Topic
Paper from members of the public.  1 response from an individual
who wished for their comments to be recorded as a formal dispute
due to the scale of maps provided in the topic paper, their view
that the Council has consistently ignored the green belt around
Scone, and the failure of the evidence to identify what the village
envelope scale is.  Another formal dispute from an anonymous
respondent has been noted on the issue on the grounds Craigend
requires to be properly considered on the ground and compared
against the other similar settlements around Perth which have
been omitted from the green belt.  The final response was also
from an anonymous individual, they disagreed with the list of
evidence and datasets reviewed, as they disagreed that urban areas
have to be more densely populated in order to protect the green
belt.  They did not wish for their comments to be registered as a
formal dispute.
 Landowners and Agents:  2 responses neither agreed nor disagreed
with the list of evidence and the summary of implications for the
Proposed Plan.  1 disagreed with the implications (Ristol
Consulting), on the grounds that policy drives change and as such a
spatial framework which actively focuses on decarbonising heat
and transport would enable scalable change.  However, they did
not wish to register their comments as a formal dispute.  1
respondent (Savills on behalf of Scone Estate) made no comments
on the evidence and summary of implications, but under the
further comments section of the consultation questionnaire they
raised a formal dispute on the grounds that the Council should take
a root and branch approach to the review of the green belt and
consider whether it remains relevant and consider that Scone
Estate should be identified as an existing major business within the
green belt boundary whenever a review is being carried out. 
 Other Bodies:  Homes for Scotland wish to formally dispute the
summary of implications of the evidence for the Proposed Plan on
the grounds that a green belt review must be carried out.

Page 184

184
ISSUE 007: BROWNFIELD, VACANT AND DERELICT LAND, AND EMPTY
BUILDINGS
Links to Evidence:
Scottish Vacant and Derelict Land Survey 2023 (Core Doc Ref: CD048)
Buildings at Risk Register for Scotland (Core Doc Ref: A007_CD001)
Society for the Protection of Ancient Buildings Survey of Thatched
Buildings in Scotland (Core Doc Ref: A007_CD002).
Church of Scotland Properties for Sale (Core Doc Ref: A007_CD003).
Perth and Kinross Housing Land Audit 2023 (Core Doc Ref: A007_CD004).
Perth and Kinross City and Town Centre Retail Study (Core Doc Ref: CD023).
Perth and Kinross Local Housing Strategy Framework 2022-27 and Action
Plan(Core Doc Ref: A007_CD005).
Perth and Kinross Council Reusing Empty Properties(Core Doc Ref:
A007_CD006)
Perth and Kinross Council Elected Member Briefing – Vacant and Eyesore
(Core Doc Ref: A007_CD007)
Property Taskforce Update(Core Doc Ref: A007_CD008)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue 007, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix A to this Evidence Report.  Chapter 6 also provides
an overview of the main issues of relevance in the development of LDP3. 
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue, it was
identified that:
 Identification of Sites - Not all brownfield land and vacant buildings
will be included within the Scottish Vacant and Derelict Land Survey
(SVDLS), only those which meet the criteria for inclusion in the
national survey.  The Proposed Plan will need to use the most up-
to-date data available given the emphasis in NPF4 Policy 9 on
encouraging, promoting and facilitating the reuse of brownfield,
vacant and derelict land and empty buildings, and helping reduce
the need for greenfield development. 
Key to achieving Local Housing Strategy Action 1.3 is developing a
register of potential brownfield regeneration sites.  A pilot exercise
was undertaken for a specific area of Perth and Kinross.  This
considered vacant and derelict land, vacant properties, community
land audit, car parks, underutilised open space, land in council
ownership, land allocated for employment safeguarding in LDP2,
land allocated in LDP2 and the housing land audit but not yet
fulfilled, and officer identified sites.  The main purpose was to
identify sites for affordable housing, including small sites that could
be brought forward for development immediately or considered for
the longer term via the LDP review process. 
An initial assessment identified those sites which could be
immediately discounted, for example, those which would not
comply with planning policy.  A full site assessment was then

Page 185

185
carried out on the remaining sites, and these were then scored to
identify: 
o Green sites with few constraints and the potential for delivery
in 1-2 years.
o Amber sites with a small number of significant constraints (or
many small constraints) that make feasibility less certain and
where further assessment would be clarified via a planning
application.
o Red sites which have significant constraints, and which would
need to be considered through the review of the LDP
Partners, including development trusts are using the results of the
pilot to engage with landowners and explore the development
viability of green and some amber rated sites in more detail. 
Following the pilot the process was reviewed and refined and has
been rolled-out to a number of the tiered settlements in Perth and
Kinross (as defined in the localities profile exercise) with the
remainder due to be complete by early 2026. This study does have
the potential to amass a large amount of data for these key
settlements in Perth and Kinross. Of relevance to the preparation of
the Proposed Plan will be the identification of ‘red’ sites which will
require to be assessed through the LDP review process. 
An additional output beyond identifying land with housing
potential, is a register of brownfield sites for development that are
in line with current planning policy and preliminary development
risks have been assessed.   In this there may also be scope to
include other brownfield land, for example, land with no use
currently, or land with potential for ‘soft’ uses such as open space.
Having an up to date and accurate record of all known brownfield
land within the area will help identify the scale of the problem and
any issues relating specifically to Perth and Kinross which may
require a local policy response in LDP3, as well as highlighting
potential sites for development.
 Retail Floorspace Data - A comparison of vacancy data is not
available for the smaller town centres of Aberfeldy, Alyth, Coupar
Angus and Dunkeld.
Statements of Agreement and/or Dispute:
11 responses were received on our Brownfield, Vacant and Derelict Land
and Empty Buildings Topic Paper, 3 of which came from respondents who
did not provide their name or contact details.  Around half of respondents
either agreed with or had no comment to make on the evidence identified
through Topic Paper 010, or the summary of the implications of that
evidence for the Proposed Plan provided by the Council.  A number offered
examples of additional sources of information which they felt should be
considered and / or highlighted other potential implications for the
Proposed Plan.  1 respondent on the issue wished for their comments to
be treated as a formal dispute to the Evidence Report and 3 comments
where the respondents indicated that they disagreed with the evidence
but did not wish for their response to be treated as a formal dispute.

Page 186

186
A full summary of these comments, their status, and the Council’s
response are provided in the table relevant table under this issue 007 in
Appendix A.  A breakdown of those responses grouped under stakeholder
categories is provided below.
 Key Stakeholders:  
o Nature Scot, agreed
o Historic Environment Scotland, agreed
o Scottish Water, agreed
 Community Councils: 2 responses, 1 agreed, and the other (Errol
Community Council) disagreed with the list of evidence and
summary of implications, as, in their view, there is insufficient data
to determine what is considered vacant and derelict in their area,
and the impacts have not been fully outlined, sufficient to allow
them to understand at this stage.   However, they did not wish for
their response to be registered as a formal dispute to the Evidence
Report. 
 Public At Large: 3 anonymous responses were received on Topic
Paper 010, 2 of which disagreed, and 1 which agreed.  1 of those
respondents who disagreed wished for their response to be
registered as a formal dispute to the Evidence Report on the
grounds that the accuracy of the total brownfield/derelict area
across the Council Area outwith urban areas (24 Ha); the extent of
brownfield/derelict land at Errol Airfield would surpass the 24 Ha
over the total Perth and Kinross Council Area, and the omission of
any reference to Errol Airfields – the largest brownfield site in the
Council Area.  The other anonymous response disagreed with the
summary of implications for the Proposed Plan due to the view that
vacant sites when they come up should be looked at as an
opportunity to reduce existing and future flood risk within urban
areas, through providing built in underground water storage to
reduce surcharging from manholes in built-up areas.  They did not
wish their comments to be registered as a formal dispute.
 Landowners and Agents:  2 responses were received, neither
agreed nor disagreed with the list of evidence and the summary of
implications for the Proposed Plan. 
 Other Bodies:  Homes for Scotland disagreed with the list of
evidence and summary of implications on the grounds that they are
of the opinion that greater recognition should be given in the
Evidence Report to the Housing Land Audit (HLA) as a source of
evidence and potential for brownfield sites.   If the evaluation of
evidence under this issue is updated to include the HLA (it now
has), the respondent does not wish to take their response forward
as a formal dispute to the Evidence Report.

Page 187

187
ISSUE 008: COASTAL DEVELOPMENT AND AQUACULTURE
Links to Evidence:
Flood risk information
SEPA medium future flood risk 2080 coastal flood risk mapping (Core Doc
Ref: A008_CD001)
SEPA Flood Risk and Land Use Vulnerability Guidance (Core Doc Ref:
A008_CD002)
Tay Flood Risk Management Plan (Core Doc Ref: A008_CD003)
Tay Local Flood Risk Management Plan (Core Doc Ref: A008_CD004)
Climate Change Master Action Plan (Core Doc Ref: A008_CD005)
Climate Change Risk and Opportunity Assessment (Core Doc Ref:
A008_CD006)
Perth and Kinross Council Strategic Flood Risk Assessment (Core Doc Ref
CD026)
Coastal planning
Mapping Coastal Erosion Disadvantage in Scotland (Core Doc Ref:
A008_CD007)
Coastal Change Adaptation Guidance (Core Doc Ref: A008_CD008)
Perth Harbour Business Plan Update and Future Options Appraisal(Core Doc
Ref: A008_CD009)
TAYplan Strategic Development Plan (SDP) 2016-2036 Coastal Classification
(Core Doc Ref: A008_CD010)
Perth and Kinross Structure Plan approved June 2003, Assessment of the
Coastline (Core Doc Ref: A008_CD011)
Scottish Coastal Observatory Data (Core Doc Ref: A008_CD012)
Big Place Conversation Summary Report (Core Doc Ref: CD015)
Big Place Conversation Carse of Gowrie Summary Report (Core Doc Ref:
A008_CD014)
Aquaculture information:
Marine Scotland National Marine Plan (Core Doc Ref: A008_CD015)
Nature Scot’s Planning and Development Guidance on Marine
Aquaculture(Core Doc Ref: A008_CD016)
SEPA’s Planning and Development Guidance on Marine Aquaculture (Core
Doc Ref: A008_CD017)
SEPA Revised Regulatory Framework and Sector Plan (Core Doc Ref:
A008_CD018)
GIS data from Marine Scotland on Shellfish Water Protected Areas (Core
Doc Ref: A008_CD019)
Marine Scotland’s Planning and Locational Guidelines (Core Doc Ref:
A008_CD020)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue 008, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix A to this Evidence Report.  Chapter 6 also provides
an overview of the main issues of relevance to the development of LDP3. 
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue, it was
identified that:
 SEPA medium future flood risk 2080 coastal flood risk mapping is the
best proxy for the at-risk flood risk areas mentioned in NPF4, this is
currently based on UK 2009 Climate Projections but will be updated to
reflect the UK 2018 Climate Change Projections.  If this updated

Page 188

188
climate change mapping is available it will be used in the site
assessments for the Proposed Plan.
However, whilst development in coastal areas as per the NPF4 coastal
development policy should be sensitive to sea level rises/flood risk and
to environmental constraints and qualities, is NPF4’s intention to
propose a more restrictive precautionary approach for coastal rural
areas compared to otherwise similar inland rural areas?  If not, the
intention would be to consider the undeveloped coastline to be
isolated/unspoiled coastline, and there would be no undeveloped
coastline within Perth and Kinross.
NPF4 does not define the undeveloped coastline.  It is unclear whether
undeveloped means remote unspoiled coastline with wild land
qualities, or if it is any area outwith a settlement boundary, like the
areas of significant constraint mentioned in SPP 2014.  If it is referring
to remote and unspoiled areas then there is no undeveloped coastline
within the Perth and Kinross Area, as the coastline is close to large
centres of population, is accessible, and is not a wild or remote
unspoiled coastline, due to it never being far from settlement, the
road network and railway line, or other signs of human activity. 
However, if the undeveloped coastline is an area that is not
urban/settled then the entire coastline along the Tay from Invergowrie
to Perth on the north bank, and also along the southern bank of the
Tay, apart from the small settlements themselves, would be
considered to be undeveloped as per the Perth and Kinross Structure
Plan 2003. 
If it is the latter definition, then the Proposed Plan could identify its
undeveloped coast accordingly and potentially define this as either 1
Km inland (to align with the outer distance used by the Dynamic Coast
for mapping of assets and vulnerability) or 0.5 Kms inland (to align
with the 2003 Perth and Kinross Structure Plan) from the mean high-
water mark.  The coastal zone could be from Perth itself, as the impact
of the tides affect Perth, or alternatively it could be from where the
River Earn meets the Tay.
Based on the Dynamic Coast web maps, and observing there are no
areas at risk from coastal erosion, there does not appear to be
significant concerns related to this coastline.  The Council received
funding for a Coastal Change Adaption Plan.  The original intention
was to use the Phase 1 funds to inform a Coastal Change Adaption
Plan but given the short length of the coastline within Perth and
Kinross, and limited receptors, an alternative approach was taken.
Additionally, it is noted that there are no areas shown at risk in the
Dynamic Coast webmaps ‘Future Erosion 2100 High Emissions’
scenario.  Funds received were used for alternative coastal wall repairs
project as agreed with the Scottish Government.
To date, Perth and Kinross Council has not received funding from later
phases, but if a Coastal Change Adaptation Plan is prepared it would
inform the development of LDP3 Proposed Plan.  
 The NPF4 policy framework, and Nature Scot landscape and visual
guidance are likely to be sufficient for the consideration of future

Page 189

189
planning applications for shellfish farms, for finfish hatcheries and
freshwater adult growth stage facilities.  Together with Marine
Scotland National Marine Plan 2015 and its successor, this policy
framework will provide appropriate policy context for marine
planning. Given the limited area and local context in LDP3 a local
policy is not deemed necessary.

Page 190

190
Statements of Agreement and/or Dispute:
5 responses were received on our Coastal Development and Aquaculture
Topic Paper.  All of the respondents either agreed with or had no comment
to make on the evidence identified through Topic Paper 011, or the
summary of the implications of that evidence for the Proposed Plan
provided by the Council. A number of responses highlighted other
potential implications for the Proposed Plan or made further comments.
A full summary of these comments, their status, and the Council’s
response are provided in the table relevant table under this issue 008 in
Appendix A.  A breakdown of those responses grouped under stakeholder
categories is provided below.
 Key Stakeholders:  
o Nature Scot, neither agreed nor disagreed with the list of
evidence/datasets and summary of implications for the
Proposed Plan, but did suggest that more could be included
under the summary of implications section regarding
climate change and biodiversity, which could also include
the key policy connections set out in NPF4 for this policy
and expand upon these in the context of Perth and Kinross.
o Scottish Water, neither agreed nor disagreed.
 Community Councils: 2 responses, 1 agreed, and the other neither
agreed nor disagreed with the list of evidence and summary of
implications provided. 
 Public At Large: No comments received.
 Landowners and Agents:  1 response was received which neither
agreed nor disagreed with the list of evidence and the summary of
implications for the Proposed Plan. 
 Other Bodies:  No comments received.

Page 191

191
ISSUE 009: ENERGY, HEATING AND COOLING (INCLUDING
INFRASTRUCTURE: ENERGY SUPPLY SYSTEMS)
Links to Evidence:
National and Local Policy Context
Climate Change (Emissions Reduction Targets) (Scotland) Act 2019 (Core
Doc Ref: A009_CD001)
Update to the Scottish Government Climate Change Plan 2018-2032 (Core
Doc Ref: A009_CD002)
Draft Energy Strategy and Just Transition Plan (Core Doc Ref: A009_CD003)
Heat in Buildings Strategy(Core Doc Ref: A009_CD004)
Heat in Buildings Bill(Core Doc Ref: A009_CD005)
Heat Networks (Scotland) Act 2021(Core Doc Ref: A009_CD006)
Perth and Kinross Council Corporate Plan (2022-2027) (Core Doc Ref:
A009_CD007)
Perth and Kinross Council Climate Change Strategy and Action Plan(Core
Doc Ref: A009_CD008)
Perth and Kinross Council Local Area Energy Plan (LAEP) (Core Doc Ref:
A009_CD009)
Perth and Kinross Council Local Heat and Energy Efficiency Strategy
(LHEES) (Core Doc Ref: A009_CD010)
Perth and Kinross Council Local Housing Strategy (2022-2027) (Core Doc Ref:
A009_CD011)
Energy Infrastructure
National Grid 'Beyond 2030'(Core Doc Ref: A009_CD012)
Energy Act 2023(Core Doc Ref: A009_CD013)
National Energy System Operator(Core Doc Ref: A009_CD014)
Proposals for Local Energy system governance(Core Doc Ref: A009_CD015)
SSEN transmission network infrastructure(Core Doc Ref: A009_CD016)
SSEN Transmission network map tool(Core Doc Ref: A009_CD017)
SSEN Transmission Pathway to 2030 projects(Core Doc Ref: A009_CD018)
SSEN Transmission Plans for Central Highlands(Core Doc Ref: A009_CD019)
SSEN Transmission Plans for East Coast(Core Doc Ref: A009_CD020)
SSEN Transmission projects map(Core Doc Ref: A009_CD021)
SSEN distribution network infrastructure(Core Doc Ref: A009_CD022)
SSEN distribution embedded capacity(Core Doc Ref: A009_CD023)
SSEN Distribution SHEPD Long Term Development Statement(Core Doc Ref:
A009_CD024)
SSEN Distribution SEPD Long Term Development Statement(Core Doc Ref:
A009_CD025)
SSEN Distribution Network Future Energy Scenario (DFES) Report (2024)
(Core Doc Ref: A009_CD026)
SSEN Distribution DFES Report (2024) for the North of Scotland(Core Doc
Ref: A009_CD027)
SSEN Distribution Strategic Development Plans (SDPs) (Core Doc Ref:
A009_CD028)
SSEN LENZA Tool(Core Doc Ref: A009_CD029)
Scottish Power Transmission(Core Doc Ref: A009_CD030)
Scottish Power Distribution(Core Doc Ref: A009_CD0031)
UK Government Energy Statistics(Core Doc Ref: A009_CD0032)
Perth and Kinross Council Map - Location of Renewable Energy
Proposals(Core Doc Ref: A009_CD0033)
SSE Renewables - Planned Upgrades(Core Doc Ref: A009_CD0034)
SGN - Gas Network(Core Doc Ref: A009_CD0035)
Scottish Government Hydrogen Action Plan(Core Doc Ref: A009_CD0036)

Page 192

192
Future Opportunities – Renewable Energy and Decarbonised Heat
Perth and Kinross Council LHEES Strategy and Delivery Plan(Core Doc Ref:
A009_CD0037)
Perth and Kinross Council Green Assets Map(Core Doc Ref: A009_CD038)
Onshore Wind Policy Statement(Core Doc Ref: A009_CD039)
Hydrogen in Scotland(Core Doc Ref: A009_CD040)
Scottish Enterprise Hydrogen Sites Study(Core Doc Ref: A009_CD041)
Scottish Water Renewable Energy Opportunities Guide(Core Doc Ref:
A009_CD042)
Perth and Kinross Council Community Projects(Core Doc Ref: A009_CD043)
Constraints and Environmental Considerations
Perth and Kinross Landscape Guidance(Core Doc Ref: A009_CD044)
Perth and Kinross Council Landscape Capacity Study - Wind (Core Doc Ref:
A009_CD045)
Nature Scot Landscape Sensitivity Study Guidance(Core Doc Ref:
A009_CD046)
Perth and Kinross Local Development Plan (2019) (Core Doc Ref:
A009_CD047)
Fourteenth Annual Report on the Operation of Section 72 of the Climate
Change (Scotland) Act 2009 (Core Doc Ref: A009_CD048)
Scottish Government New Build Heat Standard (Core Doc Ref: A009_CD049)
Perth and Kinross Council Draft Supplementary Guidance for Renewable
and Low Carbon Energy (Core Doc Ref: A009_CD050)
Chief Planner Letter (2024) (Core Doc Ref: A009_CD051)
Good Practice Principles for Community Benefits from Onshore Renewable
Energy Developments(Core Doc Ref: A009_CD052)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue 009, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix A to this Evidence Report.  Chapter 6 also provides
an overview of the main issues of relevance to the development of LDP3. 
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue, it was
identified that:
 Formal Designation of Heat Network Zones – in line with the
requirements of the Heat Networks (Scotland) Act 2021 – is still to
take place.   Key considerations are still to be considered as part of
the drafting of the Heat in Buildings Bill, including the potential
power for local authorities to require any building owners to end
their use of polluting heating once they have the opportunity to
connect to a heat network.  The Scottish Government is currently
unable to provide clarity about the role of HNZs, required
connections and planned next steps in the designation process. 
Given these uncertainties, a clear commitment and timescale for
formal designation of HNZs within Perth and Kinross is not possible
at this stage.
Perth HNZ has progressed the furthest, but further work is required
to refine and develop the SOC/OBC and financial model.  There is
also parallel work being progressed to bundle the Perth Strategic

Page 193

193
Heat Network alongside other low carbon energy projects to procure
a Strategic Energy Partner (SEP).  A SEP will likely carry out their own
technical and commercial feasibility work.  Both workstreams may
impact the proposed Perth HNZ boundary, and the latter may also
help define other HNZs.
To allow HNZ boundaries to be defined at the appropriate stage, and
be supported by the LDP, it is envisaged that LDP3 will have a heat
network policy which will signpost to a separate designated HNZs
document/ web map.  This approach also aligns with that being take
by Fife Council and will allow PKC to identify and update HNZs as
required.
 Landscape Capacity for Wind - The Council’s Landscape Capacity
Study for Wind was published in 2010 and therefore does not reflect
the current planning policy framework for wind proposals.  The
expectations around landscape impacts have shifted as per NPF4
Policy 11e(ii), whereby significant landscape impacts are to be
expected at the localised level and/or provided appropriate design
mitigation is included. There are no plans to update the landscape
capacity study, however draft Renewable Energy Guidance consulted
on during September and October 2025 will provide guidance to
support implementation of NPF4 Policy 11, including in relation to
project design and layout to mitigate landscape impacts. This will
refer to Nature Scot’s Landscape Sensitivity Guidance.
 Pipeline Infrastructure - There are indicative plans for potential new
pipeline infrastructure across Scotland including in the Perth and
Kinross Area to support emerging plans around hydrogen
production/transmission.  Plans are at an early stage and will
continue to be monitored and considered during the preparation of
the Proposed Plan, where relevant. 
 UK Energy Governance - The development of UK energy governance
arrangements will continue to be monitored and considered during
the preparation of the Proposed Plan, where relevant.

Page 194

194
Statements of Agreement and/or Dispute:
The Council engaged specifically with SSEN (transmission and distribution),
SPEN and SGN in the preparation of this Evidence Report, and provided
other key stakeholders, groups and members of the public an opportunity
to provide feedback on Topic Paper 012: Energy, Heating and Cooling
through our 6-week engagement period.
14 responses were received on Topic Paper 012, 4 disagreed with the list
of evidence/datasets reviewed, and/or the summary of implications for the
Proposed Plan provided, 1 of which (Holder Planning on behalf of SSE
Renewables) wished for their comments to be recorded as a formal
dispute to the Evidence Report.   4 of the responses agreed, and 5
respondents neither agreed nor disagreed.   
A full summary of these comments, their status, and the Council’s
response are provided in the table relevant table under this issue 009 in
Appendix A.  A breakdown of those responses grouped under stakeholder
categories is provided below.
 Key Stakeholders:  
o Nature Scot, neither agreed nor disagreed with the list of
evidence/datasets and summary of implications for the
Proposed Plan and welcomed the inclusion of landscape in
the topic paper. 
o Scottish Enterprise disagreed with the list of
evidence/datasets reviewed and the summary of
implications provided specifically regarding the wording
under paragraph 2.35 of Topic Paper 012 in relation to the
role of hydrogen in the gas grid for future home heating,
highlighting the Scottish Government’s Hydrogen Action
Plan which places hydrogen for home heating low on the
hierarchy of uses, and specifically notes that hydrogen is not
considered to play a central role in decarbonising heating. 
They do not wish for their response to be registered as a
formal dispute to the Evidence Report.
o Scottish Water, agreed.
 Community Councils: 2 responses, 1 agreed, and the other neither
agreed nor disagreed with the list of evidence and summary of
implications provided. 
 Public At Large: 3 responses were received on the topic paper. 2 of
which agreed with the list of evidence and summary of implications
for the Proposed Plan. 1 response from a private individual
disagreed on the basis that Topic Paper 012 did not consider the
potential concerns over the commercial robustness of providers
and the implications of failure of the enterprise.  They also noted
that the topic does not give sufficient focus on the rural elderly on
migrating from LPG/Gas to other forms of heating, and the
assistance they may need.  The respondent did not wish for their
comments to be registered as a formal dispute.
 Landowners and Agents:  3 responses were received, 2 of which
neither agreed nor disagreed with the list of evidence and summary
of implications.  1 response (Holder Planning on behalf of SSE
Renewables) wished for their comments to be registered as a
formal dispute to the Evidence Report in relation to the omission of
Onshore Wind: Policy Statement 2022 from the section in the topic
paper on legal and national policy requirements and expectations,
and also on the basis that the Council’s Landscape Capacity Study
for Wind (2010) should carry very limited weight due to it being out
of date and subsequent policy changes having occurred since its
publication.  They also dispute the proposed use of the 2010 study

Page 195

195
in assessing proposals against LDP3, and the potential for a spatial
strategy for renewable development being included within LDP3. 
They note that local guidance would be helpful to provide further
detail to any localised considerations, but it is not required to be
enshrined within the new LDP.  
 Other Bodies: 
o Homes for Scotland disagreed with the list of
evidence/datasets and the summary of implications
provided.  They provided an additional list of suggested
evidence for inclusion and highlighted that there is no
longer a need to include policies within Development Plans
following the repeal of Section 72 requirements under the
Fourteenth Annual Report on Section 72 of the Climate
Change Act.  The respondent also highlighted that energy
infrastructure will have an impact on the locations suitable
for accommodating housing development and therefore
compatibility in relation to expansion of the national grid
network will need to be considered, and that LDP3’s Spatial
Strategy will need to consider both sustainable and
marketable locations for new development.  Furthermore, it
was their view that the Council will need to work with the
DNO to ensure an upgrade to the network is aligned with
future housing supply pipeline.  Homes for Scotland did not
wish to register their response as a formal dispute to the
Evidence Report. 
o SSEN Transmission agreed with the list of evidence and
summary of implications provided.

Page 196

196
ISSUE 010: ZERO WASTE
Links to Evidence:
Scotland's Zero Waste Plan (Core Doc Ref: A0010_CD001)
Making things last: a circular economy strategy (Core Doc Ref: A010_CD002)
Stop, Sort, Burn, Bury - incineration in the waste hierarchy: independent
review (Core Doc Ref: A010_CD003)
SEPA waste analysis: household waste (Core Doc Ref: A010_CD004)
SEPA waste analysis: waste sites and capacity (Core Doc Ref: A010_CD005)
SEPA Regional capacity calculations for Scottish Planning Policy (SPP) (2018
data) (Core Doc Ref: A010_CD006)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue 010, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix A to this Evidence Report.  Chapter 6 also provides
an overview of the main issues of relevance to the development of LDP3.
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue 010, it was
identified that:
 The current Perth and Kinross Waste Management Plan covers the
period 2010-2025 but is likely to be updated.
Statements of Agreement and/or Dispute:
2 responses were received on our Zero Waste Topic Paper.  1 respondent
agreed with the evidence identified through the paper, and the summary
of the implications of that evidence for the Proposed Plan provided by the
Council.  The other had no specific comments.  
A full summary of these comments, their status, and the Council’s
response are provided in the relevant table under issue 010 in Appendix A.
A breakdown of those responses grouped under stakeholder categories is
provided below.
There were no formal disputes
 Key Stakeholders:  Historic Environment Scotland noted the
maintenance, reuse and adaptation of existing assets such as our
built historic environment aligns with the policy aims for the
reduction and reuse of materials in construction.
 Community Councils: Earn Community Council made constructive
comments on issues for the Proposed Plan to consider.
.

Page 197

197
LIVEABLE PLACES

Page 198

198
LIVEABLE PLACES
5.4.1 The issues covered under the NPF4 theme Liveable Places are:
 011: Design, Quality and Place
 012: Local Living and 20 Minute Neighbourhoods
 013: Blue and Green Infrastructure
 014: Play, Recreation and Sport
 015: Flood Risk and Water Management
 016: Health and Safety
5.4.2 A full summary of the review of evidence undertaken for all issues
under this theme, including all relevant links to that evidence, and
a summary of implications for the Proposed Plan, and of
stakeholder engagement, has been provided under Appendix B to
this Report.  
5.4.3 To save duplication in the re-reporting of that information, the
pages to follow concentrate instead on providing an overview of
the identified gaps, uncertainties or key issues in the evidence
gathered, and a summary of agreement, and/or disputes related
to the evidence which were received through our programme of
participation and engagement reported under Chapter 3.

Page 199

199
ISSUE 011: DESIGN, QUALITY AND PLACE
Links to Evidence:
Perth and Kinross Council Corporate Plan 2022-2027  (Core Doc Ref: CD027)
LDP Spatial Strategies
Scottish Government and COSLA’s Place Principle (2019) (Core Doc Ref:
B011_CD001)
Scottish Government, Creating Places: A policy statement on architecture
and place for Scotland (June 2013) (Core Doc Ref: B011_CD002)
Scottish Government, Designing Streets: A Policy Statement for Scotland
(March 2010) (Core Doc Ref: B011_CD003)
Perth and Kinross Local Development Plan 2 (2019) (Core Doc Ref:
B011_CD004)
Scottish Government NPF4: Annex D – Six Qualities of Successful Places
(Core Doc Ref: B011_CD005)
Transport Scotland, Sustrans and SCOTS, Cycling by Design 2021 (Core Doc
Ref: B011_CD006)
Scottish Government, Planning Advice Note 83: Master planning (Core Doc
Ref: B011_CD007)
Perth and Kinross Placemaking Guide Supplementary Guidance (2020)
(Core Doc Ref: B011_CD008)
Perth and Kinross Consultation Draft Mobility Strategy (2024) (Core Doc Ref:
B011_CD009)
Perth and Kinross Mobility Strategy Draft Action Plan (2024) (Core Doc Ref:
B011_CD010)
Scottish Household Survey (SHS) (Core Doc Ref: B011_CD011)
Understanding Our Local Places
The Improvement Service, Place Standard Engagement Tool (Core Doc Ref:
B011_CD012)
Perth and Kinross Council LDP3 Big Place Conversation (Core Doc Ref:
B011_CD013)
Scottish Index of Multiple Deprivation (SIMD) (Core Doc Ref: B011_CD014)
Scottish Government, Scottish House Condition Survey: Local Authority
Analysis 2017-2019 (February 2021) (Core Doc Ref: B011_CD015)
Perth and Kinross Council, Local Housing Strategy (LHS) 2022-2027 (Core
Doc Ref: B011_CD016)
Perth and Kinross Council, LHS Action Plan 2022-2027 (Core Doc Ref:
B011_CD017)
Perth and Kinross LDP2 Design Charettes( Core Doc Ref: B011_CD018)
Perth and Kinross Community Plan (Local Outcomes Improvement Plan)
2022-32 (Core Doc Ref: B011_CD019)
Perth and Kinross Area Local Action Plans (Core Doc Ref: B011_CD020)
Community Action Plans - Meigle and Ardler (Core Doc Ref: CD037), Stanley
(Core Doc Ref: CD038), Alyth (Core Doc Ref: CD039), Coupar Angus (Core Doc
Ref: CD040) , Dunkeld and Birnam (Core Doc Ref: CD041), Crieff (Core Doc Ref:
CD042) , Blairgowrie and Rattray (Core Doc Ref: CD43), Pitlochry and Moulin
(Core Doc Ref: CD044) , Muthill and Tullibardine (Core Doc Ref: CD045),
Auchterarder and Aberuthven (Core Doc Ref: CD046), and St. Fillans (Core
Doc Ref: CD047).

Page 200

200
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix B to this Evidence Report.  Chapter 6 also provides an
overview of the main issues of relevance to the development of LDP3.
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue 011, it was
identified that:
 Perth and Kinross Placemaking Guide Supplementary Guidance
(2020) - The guidance remains relevant, but will require a review and
some minor updates, to ensure the references contained within it
and the terminology used are in line with NPF4, to allow its future
use alongside LDP3.
 Scottish Government, Scottish House Condition Survey: Local
Authority Analysis 2017-2019 (February 2021) - The survey merges
three years’ worth of data (2017-2019) to achieve sufficient sample
sizes and the survey analysis reports on the average figures for the
three-year period.  Whilst it is a useful dataset, it has already been
used to develop the Council’s Local Housing Strategy and Action Plan,
and as such the incorporation of the relevant priorities and spatial
elements identified in those documents would be most appropriate
to the development of the Proposed Plan.
 Perth and Kinross LDP2 Design Charettes - Due to when they were
produced, any data or statistics contained within the Design
Charettes, which has since been updated, should be reviewed as part
of the LDP3 Locality Profile work.  The Audit should also consider if
progress has been made against the key issues and actions identified
in the Charettes, and how those issues and actions compare to the
feedback gathered through the Big Place Conversation.
 Perth and Kinross Area – Local Action Plans (LAPs) - The LAPs
contain important profiles of our localities across Perth and Kinross,
particularly around their ‘Key Inequalities’.  However, as they were
all published in 2017 the statistical data reported within them are
not the most recent available data.  The list of ‘key Issues Identified’
and ‘What needs to change’ accompanying statements contained
within the LAPs will be reviewed as part of our LDP3 Locality Profile
exercise but will be viewed taking account of relevant up-to-date
data and information.
 Perth and Kinross Council Ward Profiles - The Ward Profiles contain
some data and information which is now out of date.  As part of the
Locality Profile exercise for developing the Proposed Plan, they
should be viewed in the light of the most up-to-date information
available for the key characteristics and challenges for those places.

Page 201

201
Statements of Agreement and/or Dispute:
14 responses were received on our Design, Quality and Place Topic Paper. 
Most respondents (12 out of 14) either agreed with or had no comment to
make on the evidence identified through Topic Paper 018, and the
summary of the implications of that evidence for the Proposed Plan
provided by the Council.  A number offered examples of additional sources
of information which they felt should be considered.   There were 2
responses on the issue which the respondents wished to be treated as a
formal dispute to the Evidence Report.  
A full summary of these comments, their status, and the Council’s
response are provided in the table relevant table under this issue 011 in
Appendix B.  A breakdown of those responses grouped under stakeholder
categories is provided below.
 Key Stakeholders:  
o Historic Environment Scotland agreed and further
commented that they welcome the references in the topic
paper to the Council’s Placemaking Guide, and the
commitment to update it.  
o Nature Scot, neither agreed nor disagreed, but flagged the
omission of the reference to the Scottish Government’s
‘Creating Places: A policy statement on architecture and
place for Scotland’ being carried through from the summary
of implications of evidence to the list of evidence and
datasets.  This has been remedied. 
o Tactran Regional Transportation Partnership agreed and
overall welcomed the detail set out in Topic Paper 018, and
provided advice on the key transport related considerations
which the Council should consider in developing our LDP3
Spatial Strategy in order to deliver connected places which
are accessible for everyone.
o Perth and Kinross Council Transportation and Development
Team, neither agreed nor disagreed with the list of evidence
and summary of implications, but did highlight the
importance of Action 153 of the Council’s Mobility Strategy
and Action Plan to the development of the Proposed Plan. 
o Scottish Water, neither agreed nor disagreed and
commented that they welcome a best practice approach on
water efficiency across the Plan Area, and the reference
under the topic paper to the use of blue-green assets as a
key design feature for new and existing developments.  
 Community Councils: 1 response was received which agreed with
the list of evidence reviewed and summary of implications for the
Proposed Plan provided, the other neither agreed nor disagreed. 
 Public At Large: 1 response were received on the topic paper from
a private individual who wished to register their comments as a
formal dispute to the Evidence Report, as in their view Topic Paper
018: Design, Quality and Place fails to address any of the recent
historical development activity (namely at North Scone) and
objections from the local community.
 Landowners and Agents:  5 responses were received on Topic
Paper 018.  1 response (A.S. Associates Ltd. Planning and
Architectural Services) disagreed with the list of evidence/ datasets
reviewed in relation to the upcoming Site Appraisal and Locality
Profile work mentioned in the relevant topic paper, and the lack of
information on which datasets will be used to provide evidence for
this area of work.  However, the respondent did not wish for their
comments to be registered as a formal dispute to the Evidence

Page 202

202
Report.  3 responses were received which neither agreed nor
disagreed, and a further 1 response agreed with the list of evidence
and summary of implications for the Proposed Plan.   
 Other Bodies: 
o Homes for Scotland disputed the list of evidence/datasets
reviewed and the summary of implications provided.  The
points which they wish to formally dispute is that the
Council should include the additional sources of information
listed in their response, and analyse how this will influence
the design, quality and place that will be created by future
development.  This has been added to the Evidence Report.

Page 203

203
ISSUE 012: LOCAL LIVING AND 20 MINUTE NEIGHBOURHOODS
Links to Evidence:
Understanding Our Local Places
Climate X Change and Ramboll, 20 Minute Neighbourhoods in a Scottish
Context (February 2021) (Core Doc Ref: B012_CD001)
Scottish Government, Local Living and 20 Minute Neighbourhoods:
Planning Guidance (April 2024) (Core Doc Ref: B012_CD002)
Perth and Kinross Council Corporate Plan 2022-2027 (Core Doc Ref:
B012_CD003)
Perth and Kinross Local Development Plan 2 (2019) (Core Doc Ref:
B012_CD004)
Perth and Kinross LDP2 Infrastructure Capacity Studies (2017) (Core Doc Ref:
B012_CD005)
Scottish Index of Multiple Deprivation (2020) (Core Doc Ref: B012_CD006)
Perth and Kinross Council LDP3 Big Place Conversation (Core Doc Ref:
B012_CD007)
Perth and Kinross Community Plan (Local Outcomes Improvement Plan)
2022-32 (Core Doc Ref: B012_CD008)
Perth and Kinross Council LDP2 Design Charettes (Core Doc Ref:
B012_CD009)
The Perth City Plan 2015-2035 (Core Doc Ref: B012_CD010)
Perth and Kinross Council Placemaking Programme (Core Doc Ref:
B012_CD011)
Invest in Perth: Smart Investing Now and for the Future (Core Doc Ref:
B012_CD012)
Perth Cycle Network Masterplan (Core Doc Ref: B012_CD013)
Perth and Kinross Council Mobility Strategy and Action Plan (Core Doc Ref:
B012_CD014)
Perth and Kinross Local Action Plans (Core Doc Ref: B012_CD015)
Community Action Plans - Meigle and Ardler (Core Doc Ref: CD037), Stanley
(Core Doc Ref: CD038), Alyth (Core Doc Ref: CD039), Coupar Angus (Core Doc
Ref: CD040) , Dunkeld and Birnam (Core Doc Ref: CD041), Crieff (Core Doc Ref:
CD042) , Blairgowrie and Rattray (Core Doc Ref: CD43), Pitlochry and Moulin
(Core Doc Ref: CD044) , Muthill and Tullibardine (Core Doc Ref: CD045),
Auchterarder and Aberuthven(Core Doc Ref: CD046), and St. Fillans (Core Doc
Ref: CD047).
Scottish Living Locally Data Portal (Core Doc Ref: B012_CD016)
The Place Principle
Scottish Government and COSLA, Place Principle (2019) (Core Doc Ref:
B012_CD017)
Location of Facilities
Perth and Kinross LDP2 Infrastructure Capacity Studies (2017) (Core Doc Ref:
B012_CD018)
Perth and Kinross Council, Map of Public Toilets and Comfort Schemes
(Core Doc Ref: B012_CD019)
Scottish Water, Your Water, Your Life - Find My Nearest Tap (Core Doc Ref:
B012_CD020)
Perth and Kinross Council List of Water Foutain and Refill Taps (Core Doc
Ref: B012_CD021)
Sport and Leisure, Arts and Cultural Activities
Perth and Kinross Council Leisure, Sport and Culture Webpage (Core Doc
Ref: B012_CD022)
Live Active Website (Core Doc Ref: B012_CD023)
Perth City and Towns Website (Core Doc Ref: B012_CD024)
Visit Scotland Website (Core Doc Ref: B012_CD025)

Page 204

204
Perth and Kinross Council Culture Strategy (2023-2028) (Core Doc Ref:
B012_CD026)
Childcare Provision and Supporting Lifelong Learning
Perth and Kinross Council Schools and Learning Webpages (Core Doc Ref:
B012_CD027)
University of the Highlands and Islands Website (Core Doc Ref: B012_CD028)
Perth and Kinross Employability Network (Core Doc Ref: B012_CD029)
Visiting Health Services and Clinics
NHS Inform Scotland’s Service Directory (Core Doc Ref: B012_CD030)
Social Interaction, and Support and Advice Services
Your Community PK Website (Core Doc Ref: B012_CD031)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue 012, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix B to this Evidence Report.  Chapter 6 also provides an
overview of the main issues of relevance to the development of LDP3.
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue, it was
identified that:
 Infrastructure Capacity Studies, Design Charette Reports, and Ward
Profiles - Despite some time having elapsed since these pieces of
evidence were produced, their content still provides a good source of
information on the assets, facilities and services offered in our
places, along with the community’s views of their local assets, their
aspirations, vision for the future of their place, and areas identified
for improvement.  Any data or statistics contained within them which
has since been updated will be reviewed as part of the LDP3 Locality
Profile work.  The Audit will also consider if progress has been made
against the key issues and actions identified, and how those issues
and actions compare to the feedback gathered through the Big Place
Conversation.
LDP2 Infrastructure Capacity Studies were only carried out for the
larger settlements within Perth and Kinross.  However, our Locality
Profile work for LDP3 will consider all settlements across the area.
 Scottish Index of Multiple Deprivation (SIMD) - SIMD data zones in
rural areas tend to cover a large land area and reflect a more mixed
picture of people experiencing different levels of deprivation.  This
means that SIMD is less helpful at identifying the smaller pockets of
deprivation found in more rural areas, compared to the larger
pockets found in urban areas. SIMD domain indicators can still be
useful in rural areas if analysed separately from urban data zones or
combined with other data.  Given the rural nature of much of Perth
and Kinross, it will be important to keep this limitation in mind when
considering rural areas as part of our Local Living and 20 Minute
Neighbourhoods analysis work.
 Locality Profiles - It is planned as part of the Locality Profile work for
LDP3 to develop a Localities Profile template which will set out those

Page 205

205
factors which Officers need to take account of in developing their
understanding of each place and its needs to satisfy the
requirements of the Planning Act, Regulations, LDP Guidance and
NPF4 policies.  This should also help inform work on Local Living and
20 Minute Neighbourhoods required under NPF4 Policy 15.  The
template has yet to be developed but will be in place prior to work
beginning on the Proposed Plan.
 Scottish Living Locally Data Portal (SLLDP) - The data included in the
Portal utilises sources produced between 2020 and 2022.  Whilst
most of the facilities and services mapped are likely to still be
available, public transport provision has changed significantly in
recent years.  The indicators of access to public transport networks
and high frequency services can offer a good understanding of the
connectivity available for residents but would benefit from more
recent data to enhance the accuracy of assessments.
The Portal utilises the same data zones as the SIMD.  While they
provide a helpful framework to understand access to services within
urban and semi-urban settlements, the SLLDP offers limited
information for rural areas. The development of 20 Minute
Neighbourhood assessment methodologies will need to consider
these limitations.
Currently, not all the information regarding the facilities and services
on offer in our communities is currently mapped in GIS.  This will
require to be carried out as part of our LDP3 Locality Profile work to
allow for analysis in terms of local living and 20 minute
neighbourhoods to be undertaken.
 Public Conveniences - Regarding the Council’s list of public toilets,
there is the intention to undertake a future review of the provision of
these facilities.  However, there is no timeframe currently for when
such a review will be carried out.
Statements of Agreement and/or Dispute:
A total of 17 responses were received on our Local Living and 20 Minute
Neighbourhoods Topic Paper.
A full summary of these comments, their status, and the Council’s
response are provided in the table relevant table under this issue 012 in
Appendix B.  A breakdown of those responses grouped under stakeholder
categories is provided below.
 Key Stakeholders:  
o Historic Environment Scotland agreed and further
commented that they welcome the references in the topic
paper to the Council’s Placemaking Guide, and the
commitment to update it.
o Nature Scot, neither agreed nor disagreed, but flagged the
omission of the reference to the Scottish Government’s
‘Creating Places: A policy statement on architecture and
place for Scotland’ being carried through from the summary
of implications of evidence to the list of evidence and
datasets.

Page 206

206
o Tactran Regional Transportation Partnership agreed and
overall welcomed the detail set out in Topic Paper 018, and
provided advice on the key transport related considerations
which the Council should consider in developing our LDP3
Spatial Strategy in order to deliver connected places which
are accessible for everyone.
o Perth and Kinross Council Transportation and Development
Team, neither agreed nor disagreed with the list of evidence
and summary of implications, but did highlight the
importance of Action 153 of the Council’s Mobility Strategy
and Action Plan to the development of the Proposed Plan. 
o Scottish Water, neither agreed nor disagreed and
commented that they welcome a best practice approach on
water efficiency across the Plan Area, and the reference
under the topic paper to the use of blue-green assets as a
key design feature for new and existing developments.  
 Community Councils: 2 responses were received from Community
Councils.  1 agreed with the list of evidence reviewed and summary
of implications for the Proposed Plan provided, while the second
Community Council wished to register their comments as a formal
dispute, stating their disagreement based on their village being part
of the Local Action Plan for Eastern Perthshire, which jeopardises
the opportunity for their area to access facilities and services under
the local living concept. 
 Public At Large: 2 responses were received on the topic paper.  1
from a private individual who wished to register their comments as
a formal dispute to this Evidence Report, as in their view Topic
Paper 019: Local Living and 20 Minute Neighbourhoods, objecting
to the evidence gathered arguing that the 20 minute
neighbourhood concept does not address community, social and
family considerations.  The second comment stated disagreement
with the implementation of the ’20-minute city’ concept but did
not wish for their comments to be registered as a formal dispute to
this Evidence Report.
 Landowners and Agents:  6 responses were received on Topic
Paper 019. 3 disagreed with the list of evidence/ datasets and/or
the summary of implications for the Proposed Plan
o 1 response (A.S. Associates Ltd. Planning and Architectural
Services) disagreed with the list of evidence/ datasets
reviewed in relation to the upcoming Site Appraisal and
Locality Profile work mentioned in the relevant topic paper,
and the lack of information on which datasets will be used
to provide evidence for this area of work.  However, the
respondent did not wish for their comments to be
registered as a formal dispute to the Evidence Report.
o 1 response (Avison Young) disagreed with the list of
evidence/ datasets provided, commenting on the lack of
clarity regarding the implications for the Plan at the topic
paper stage, and the limitations of providing comments
without settlements audits being made available.  The
respondent did not wish for their comments to be
registered as a formal dispute to the Evidence Report.
o 1 response (Gray Planning) disagreed with the list of
evidence / datasets provided, highlighting the lack of Local
Place Plans at the time of consultation.  This was considered
an obstacle for consultees to form their feedback.  The
respondent did not wish for their comments to be
registered as a formal dispute to the Evidence Report.
o 2 responses were received which neither agreed nor
disagreed, and a further 1 response agreed with the list of

Page 207

207
evidence and summary of implications for the Proposed
Plan.
 Other Bodies: 2 responses were received on this topic
o Homes for Scotland disagreed with the summary of
implications for the Proposed Plan provided.  Their
comments focus on the need to recognise the role that
housebuilders play in the delivery of infrastructure and
communities; the requirement to be flexible in the
application of local living and 20 minute neighbourhood
concepts; the opportunity for larger mixed use housing
developments to create neighbourhoods aligned with NPF4
aspirations; the need for infrastructure and services to
improve prior to considering the use of local living concepts
in rural areas; and the expectation for land allocation for
housing in town centres to be cognisant of viability factors
and placemaking.  The respondent did not wish for their
comments to be registered as a formal dispute to this
Evidence Report.
o 1 response (Kinross-shire Civic Trust) neither agreed nor
disagreed with the list of evidence/ datasets and/or the
summary of implications for the Proposed Plan.

Page 208

208
The Provision of Public Conveniences
Section 15(2A) of The Town and Country Planning (Scotland) Act 1997, as
amended, requires a statement of the planning authority’s policies and
proposals as to the provision of public conveniences.
With regards to provision within the Perth and Kinross Council (PKC) Area,
whilst the provision of public toilets is not a statutory function, it is
recognised that in an area like Perth and Kinross, which benefits from a
thriving tourist industry, it is preferrable to have facilities available.  This
has been reflected through historic committee papers and budgetary
decisions throughout the years.  Currently, a review of PKC run facilities
and provision is being planned.   In the interim, until that review has been
conducted, the Council operates 7 public toilets (a mixture of attended and
unattended), a further 1 is provided for public use through a community
development trust, and PKC also runs a ‘Comfort Scheme’ with facilities
available to the public to use at no cost at 32 partnership venues across
the Council Area.
The Provision of Water Refill Locations
Section 15(2B) of The Town and Country Planning (Scotland) Act 1997, as
amended, requires a statement of the planning authority’s policies and
proposals as to the provision of water refill locations.
Regarding water refill locations, Perth and Kinross Council manages and
maintains a long list of water stations across the Plan Area.  Most of these
points are located within premises operated by the Council, such as
education and community facilities, and access to them is limited to users
and staff associated with these locations.
Whilst the current provision is considered to cater for the needs of users of
public premises, the Council will keep under review the requirement for
the provision of additional water points in locations where an identified
need is demonstrated.

Page 209

209
ISSUE 013: BLUE AND GREEN INFRASTRUCTURE
Links to Evidence:
General
Scotland’s Environment Web (Core Doc Ref: B013_CD001)
SEPA – Environmental Data (Core Doc Ref: B013_CD002)
NatureScot – Open Data Hub (Core Doc Ref: B013_CD003)
Scottish Wildlife Trust – Open Data Hub (Core Doc Ref: B013_CD004)
Improvement Service – Spatial Hub (Core Doc Ref: B013_CD005)
Scottish Government – Spatial Data Portal (Core Doc Ref: B013_CD06)
Perth and Kinross Council – Open Data (Core Doc Ref: B013_CD007)
Perth and Kinross Council – LDP2 Webmap (Core Doc Ref: B013_CD008)
Scotland 2022 Landcover Map (Core Doc Ref: B013_CD009)
Scotland’s Wetland Inventory (Core Doc Ref: B013_CD010)
Scottish Index of Multiple Deprivation (Core Doc Ref: B013_CD011)
Audits, Policy and Strategy
Perth and Kinross Council, Draft Open Space Quality Audit (Internal Map
Project)
Perth and Kinross Council, Blue and Green Infrastructure Audit Datasets
(Core Doc Ref: B013_CD012)
Perth and Kinross Council, Green and Blue Infrastructure Supplementary
Guidance (Core Doc Ref: B013_CD013)
Perth and Kinross Council, Open Space Provision for New Developments
Supplementary Guidance (Core Doc Ref: B013_CD014)
Perth and Kinross Council Forest and Woodland Strategy (Core Doc Ref:
B013_CD015)
Perth and Kinross Council Food Growing Strategy (Core Doc Ref:
B013_CD016)
Perth and Kinross Council, Climate Change Projections Map (Core Doc Ref:
B013_CD017)
Perth and Kinross Council, Perth Integrated Catchment Study (Core Doc Ref:
B013_CD018)
Scottish Government, Surface Water Management Planning Guidance
(2018) (Core Doc Ref: B013_CD019)
Scottish Government, Water-Resilient Places (Core Doc Ref: B013_CD020)
Perth and Kinross Council Mobility Strategy and Action Plan (Core Doc Ref:
B013_CD021)
Perth and Kinross Council Active Travel Strategy (Core Doc Ref: B013_CD022)
Woodland
Ancient Woodland Inventory (Core Doc Ref: B013_CD023)
Ancient Tree Inventory (Core Doc Ref: B013_CD024)
National Forest Inventory (Core Doc Ref: B013_CD025)
Native Woodland Survey of Scotland (Core Doc Ref: B013_CD026)
Riparian Woodland Scotland (Core Doc Ref: B013_CD027)
Designated and Protected Sites
Cairngorms National Park( Core Doc Ref: B013_CD028)
Loch Lomond and the Trossachs National Park (Core Doc Ref: B013_CD029)
National Nature Reserves (Core Doc Ref: B013_CD030)
National Scenic Areas (Core Doc Ref: B013_CD031)
RAMSAR Sites (Core Doc Ref: B013_CD032)
Special Areas of Conservation (Core Doc Ref: B013_CD033)
Special Protection Areas (Core Doc Ref: B013_CD034)
Sites of Special Scientific Interests (Core Doc Ref: B013_CD035)
Scottish Wildlife Trust Reserves (Core Doc Ref: B013_CD036)
Gardens and Designed Landscapes (Core Doc Ref: B013_CD037)

Page 210

210
Perth and Kinross Council. Tree Preservation Orders (Core Doc Ref:
B013_CD038)
Perth and Kinross Council, Air Quality Management Areas (Core Doc Ref:
B013_CD039)
Existing Greenspace Areas
Perth and Kinross Council, Maintained Open Space (Core Doc Ref:
B013_CD040)
Perth and Kinross Council, Major Parks (Core Doc Ref: B013_CD041)
Perth and Kinross Council, Parks Countryside Sites (Core Doc Ref:
B013_CD042)
Perth and Kinross Council, Local Development Plan 2 Designated Open
Space (Core Doc Ref: B013_CD043)
Ordnance Survey (OS), MasterMap Greenspace (Core Doc Ref: B013_CD044)
Water Environment
Ordnance Survey (OS), MasterMap Water Network (Core Doc Ref:
B013_CD045)
SEPA, Recommended Riparian Buffer (Core Doc Ref: B013_CD046)
SEPA, Riparian Vegetation Planting Opportunities (Core Doc Ref:
B013_CD047)
SEPA, Obstacles to Fish Migration (Core Doc Ref: B013_CD048)
SEPA, Water Environment Hub (Core Doc Ref: B013_CD049)
SEPA – Water Classification Hub (Core Doc Ref: B013_CD050)
Perth and Kinross Council, Sustainable Urban Drainage Systems (Internal
Shapefile)
Flooding and Geomorphic Risk
SEPA, Surface Water Flood Risk (Core Doc Ref: B013_CD051)
SEPA, River Flood Risk (Core Doc Ref: B013_CD052)
SEPA, Coastal Flood Risk (Core Doc Ref: B013_CD053)
SEPA, Geomorphic Flood Risk (Core Doc Ref: B013_CD054)
SEPA, Natural Flood Management Maps (Core Doc Ref: B013_CD055)
Perth and Kinross Council, Strategic Flood Risk Assessment (Core Doc Ref:
CD026)
Perth and Kinross Council, Surface Water Management Plans
o Milnathort (Core Doc Ref: B013_CD056)
o Blairgowrie & Rattray (Core Doc Ref: B013_CD057)
o Perth (ongoing)
o South Kinross, Aberfeldy, Comrie and Scone (programmed
completion within next 24 months)
PKC Natural Flood Management Studies:
o Invergowrie FPS and NFM report (Core Doc Ref: CD029)
o Comrie Flood Protection Scheme Feasibility Report (Core Doc Ref:
CD034)
o Aberfeldy Flood Study Feasibility Report (Core Doc Ref: CD030)
o Alyth NFM Report (Core Doc Ref: CD031)
o Blackford Flood Study (Core Doc Ref: CD032)
o South Kinross NFM (Core Doc Ref: CD033)
Active Travel Network
Perth and Kinross Council, Adopted Core Paths (Core Doc Ref: B013_CD058)
Perth and Kinross Council, Signposted Paths (Core Doc Ref: B013_CD059)
Perth and Kinross Council, Rights of Way (Core Doc Ref: B013_CD060)
Perth and Kinross Council, Potential Routes for Footpaths (Internal
Shapefile)
Sustrans, National Cycle Routes (Core Doc Ref: B013_CD061)
Sustrans, National Cycle Network Link (Core Doc Ref: B013_CD062)
Sustrans, Regional cycle Routes (Core Doc Ref: B013_CD063)
Sustrans, Green Routes (Internal Shapefile)

Page 211

211
Ramblers, Path Network Scotland (Core Doc Ref: B013_CD064)
Tactran, Regional Active Travel Network (Core Doc Ref: B013_CD065)
PKC, Perth Cycle Network Masterplan (Core Doc Ref: B013_CD066)
Neighbouring Authorities Datasets:
o Core Paths – Scotland (Core Doc Ref: B013_CD067)
o Specific Routes:
- Cateran Trail (Core Doc Ref: B013_CD068)
- Loch Leven Heritage Trail (Core Doc Ref: B013_CD069)
- Crieff to Comrie (Pilgrim’s Way) (Core Doc Ref: B013_CD070)
- Crook of Devon to Kinross via Balado (Core Doc Ref:
B013_CD071)
Opportunities for Intervention
Perth and Kinross Local Development Plan 2 Proposals (Core Doc Ref:
B013_CD072)
Perth and Kinross Council, Maintained Open Space (Core Doc Ref:
B013_CD073)
Perth and Kinross Council, Grow Wild Sites (Core Doc Ref: B013_CD074)
Perth and Kinross Council, Disused Railway Lines (Internal Shapefile)
Perth and Kinross Council, Urban Capacity and Brownfield Study (Internal
Map Project)
Vacant and Derelict Land Survey 2022 (Core Doc Ref: CD048)
SEPA, Water Environment Fund Current and Potential Projects (Core Doc
Ref: B013_CD075)
Perth and Kinross Council, Nature Restoration Fund Projects (Core Doc Ref:
B013_CD076)
Perth and Kinross Community Groups and Projects Map (Core Doc Ref:
B013_CD077)
Perth and Kinross Environmental Youth Groups and Projects Map (Core Doc
Ref: B013_CD078)
Perth and Kinross Council, LDP3 Big Place Conversation Results(Core Doc
Ref: CD016)
Local Place Plans (Core Doc Ref: CD052)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue 013, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix B to this Evidence Report.  Chapter 6 also provides an
overview of the main issues of relevance to the development of LDP3. 
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue, it was
identified that:
 Open Space Quality Audit - At the time of writing the Open Space
Quality Audit has not been finalised.  
The Open Space Audit is progressing, with all LDP2 designated open
spaces having been audited.  The engagement has flagged over 100
smaller greenspaces valued by communities that still require site
visits.  While an initial desk-based assessment of environmental
quality has been carried out, the remaining site visits will depend on
resource availability.
Tiered settlements are projected to be complete by the end of 2026,
with the remaining smaller settlements to be completed by the end
of Quarter 1 in 2026, alongside the LDP3 locality profiling exercise to
inform the Proposed Plan.

Page 212

212
The Open Space Strategy is programmed to go to a meeting of the
Council’s Economy and Infrastructure Committee in August 2026.
A policy scoping exercise was completed in Quarter 3 2025, and a
draft policy framework will be ready for internal review by the end of
the year.
Open Space Audits are being completed alongside the Locality Profile
exercise, with tiered settlements being prioritised.
 The audit has flagged locations where interventions are required. We
have determined that the settlement strategies to be included in the
OSS will be more effective to develop alongside LDP3. This enables us
to consider where growth will be directed and where we can
leverage on-site or off-site contributions to deliver requirements
identified in the audit. Green and Blue Infrastructure (GBI) – GBI was
mapped for the Blue and Green Infrastructure Supplementary
Guidance.  This will be reviewed and updated to consider the
relevant information sources mentioned in this Evidence Report
alongside wider public and stakeholder input.  As there will no longer
be statutory supplementary planning guidance due to changes under
the 2019 Planning Act, it is considered that the mapping will need to
be included in the Proposed Plan in some form. 
 Nature Networks - Both the Green Infrastructure mapping and Open
Space Audit will address accessibility and connectivity.  This will be
supplemented by consideration of Nature Networks to develop
green networks.  Prioritisation of how green networks connect
people and nature to green spaces and through settlements will be
developed through discussion with key stakeholders and
communities as the Plan is developed.  An initial consultation on
priorities for Nature Networks took place alongside the consultation
on our Evidence Report Topic Papers. 
Enhancement Delivery - Identifying and protecting blue and green
infrastructure and green networks in the Local Development Plan is
the first stage.  This will also help development deliver opportunities
and connections as part of site planning.  NPF4 Policy 3 requires
development to deliver enhancement for biodiversity and this may
raise opportunities for the realisation of green networks both on and
offsite.  However, offsite delivery is limited by the current law around
planning conditions and in some cases may be difficult to secure until
such time that new legal mechanisms are in place. 
Planning Circular 4/1998: the use of conditions in planning permissions
sets out 6 tests for conditions, as on several occasions the Courts have laid
down the general criteria for the validity of planning conditions.  In
addition to satisfying the Courts' criteria for validity, conditions should not
be imposed unless they are necessary and effective, relevant to the
development to be permitted, and do not place unjustifiable burdens on
applicants.  This limits the scope for requiring enhancement particularly
where it is offsite.
Statements of Agreement and/or Dispute:
12 responses were received on our Blue and Green Infrastructure Topic
Paper.  Most respondents (9 out of 12) either agreed with or had no

Page 213

213
comment to make on the evidence identified through Topic Paper 022, and
the summary of the implications of that evidence for the Proposed Plan
provided by the Council.  A number offered examples of additional sources
of information which they felt should be considered and/or highlighted
other potential implications for the Proposed Plan. 
There were no responses on the Blue and Green Infrastructure issue which
respondents wished to be treated as a formal dispute to this Evidence
Report.  2 respondents disagreed with the sufficiency of the list of
evidence, and 1 disagreed with the implications of the evidence for the
Proposed Plan. 
A breakdown of those responses grouped under stakeholder categories is
provided below, and a full summary of these comments, their status, and
the Council’s response in the relevant table under the Blue and Green
Infrastructure issue 013 in Appendix B.
 Key Stakeholders:
o NatureScot, neither agreed nor disagreed.
o Tactran, neither agreed nor disagreed.
o Scottish Water, agreed.
o SEPA, disagreed that sufficient evidence was included in the
topic paper to identify blue networks but did not wish their
response to be treated as a formal dispute.
 Community Councils: 2 responses, 1 agreed and the other neither
agreed nor disagreed.
 Public at Large: 1 anonymous response from a member of the public,
disagreed but did not wish to register as a formal dispute.
 Landowners and Agents: 2 responses, neither of which agreed nor
disagreed.
 Other Bodies: 
o Homes for Scotland, disagreed with the summary of implications of
the evidence but did not wish to register as a formal dispute.
o Kinross-shire Civic Trust, neither agreed nor disagreed.
o Perth and Kinross Council Transportation and Development Team,
neither agreed nor disagreed.

Page 214

214
ISSUE 014: PLAY, RECREATION, AND SPORT (INCLUDING PLAY
SUFFICIENCY ASSESSMENT)
Links to Evidence:
National / Local Policy Context
Active Scotland Outcomes Framework (Core Doc Ref: B014_CD001)
Play Strategy for Scotland (2013) (Core Doc Ref: B014_CD002)
Progress Review of Play Strategy (Core Doc Ref: B014_CD003)
Physical Activity for Health: Scotland’s National Framework (Core Doc Ref:
B014_CD004)
Perth and Kinross Council Corporate Plan (2022-2027) (Core Doc Ref:
B014_CD005)
Existing Facilities
SportScotland Facilities Report (2024) (Core Doc Ref: B014_CD006)
Perth and Kinross Council, Location of Existing Play Areas (Core Doc Ref:
B014_CD007)
Perth and Kinross Council, Play Area Improvements (Core Doc Ref:
B014_CD008)
Perth and Kinross Council, Leisure Centres and Swimming Pools (Core Doc
Ref: B014_CD009)
Perth and Kinross Council, Council Decision on Leisure Assets in Perth (Core
Doc Ref: B014_CD010)
Perth and Kinross Council, Public Consultation on the Future of Bells Sports
Centre (Core Doc Ref: B014_CD011)
Perth and Kinross Council, Pitlochry Asset Review Council Committee
Decision (Core Doc Ref: B014_CD012)
Perth and Kinross Council, Location of Existing Outdoor Sports Pitches (Core
Doc Ref: B014_CD013)
PKC - Policy on Provision for Outdoor Sports (2017) (Core Doc Ref:
B014_CD014)
Perth and Kinross Council, Major Parks (Core Doc Ref: B014_CD015)
Perth and Kinross Council, Open Space Areas (Core Doc Ref: B014_CD016)
Perth and Kinross Council, Skate Park Facilities (Core Doc Ref: B014_CD017)
Perth and Kinross Council, Community Sport Hub Facilities (Core Doc Ref:
B014_CD018)
Perth and Kinross Council, Paths and Trails (Core Doc Ref: B014_CD019)
Perth and Kinross Council, Core Paths (Core Doc Ref: B014_CD020)
Perth and Kinross Council Water Safety Policy (Core Doc Ref: B014_CD021)
PKC Policy – Asset Management
Perth and Kinross Council, Transformation Review of Leisure Assets (Core
Doc Ref: B014_CD022)
Perth and Kinross Council, Transformation Review of Leisure Assets -
Appendix (Core Doc Ref: B014_CD023)
Perth and Kinross Council, Transformation Review - Minute of Meeting
(Core Doc Ref: B014_CD024)
Perth and Kinross Council, Committee Report - Perth City (2024) (Core Doc
Ref: B014_CD025)
Perth and Kinross Council, Committee Report - Perth City (September
2024) (Core Doc Ref: B014_CD026)
Perth and Kinross Community Green Asset Management Plan (2017-2022)
(Core Doc Ref: B014_CD027)
PKC Policy – Enhancing Opportunities for Play, Recreation and Sport
Perth and Kinross Physical Activity and Sport Strategy (2023-2028) (Core
Doc Ref: B014_CD028)

Page 215

215
Play Framework for Perth and Kinross (2019-2022) (Core Doc Ref:
B014_CD029)
Understanding Need
SportScotland, Facilities Planning Modelling (Core Doc Ref: B014_CD030)
Play Sufficiency Assessment - Regulations (Core Doc Ref: B014_CD031)
Play Sufficiency Assessment - Guidance (Core Doc Ref: B014_CD032)
Perth and Kinross Council, Play Sufficiency Assessment (Core Doc Ref:
B014_CD033)
Perth and Kinross Council, Play Sufficiency Assessment Results (Core Doc
Ref: B014_CD034)
Perth and Kinross Council, Play Sufficiency Assessment Survey Form (Core
Doc Ref: B014_CD035)
Perth and Kinross Council, LDP3 Big Place Conversation (Core Doc Ref:
B014_CD036)
Perth and Kinross Council, LDP3 Big Place Conservation Results (Core Doc
Ref: B014_CD037)
Scottish Index of Multiple Deprivation data (Core Doc Ref: B014_CD038)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue 014, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix B to this Evidence Report.  Chapter 6 also provides an
overview of the main issues of relevance to the development of LDP3.
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue 014, it was
identified that:
 The provision of opportunities for play, recreation and sport is an
evolving process as demonstrated by the asset review across the
Council Area.  Close collaboration with relevant partners will be key
to ensuring that the next LDP incorporates the most accurate
information and provides an appropriate spatial strategy and policy
framework to promote opportunities for play, recreation and sport.
 SportScotland Data - SportScotland Facilities Report (2024) is
dependent upon feedback from key stakeholders and therefore may
not be complete/accurate.  This information is used alongside
existing local information and datasets, including evidence presented
above under ‘Existing Assets’. 
SportScotland Facilities Planning Modelling (2024) is based on
modelling and not actual usage of facilities, and demand levels are
based on national surveys.  To support an accurate as possible
evidence base on facilities modelling, local data held by the Council
and Live Active Leisure (as operators) is used to determine existing
and modelled usage.
 Open Space Audit and Strategy
The Open Space Audit is progressing, with all LDP2 designated open
spaces having been audited.  The engagement has flagged over 100
smaller greenspaces valued by communities that still require site
visits.  While an initial desk-based assessment of environmental
quality has been carried out, the remaining site visits will depend on
resource availability.

Page 216

216
Tiered settlements are projected to be complete by the end of 2026,
with the remaining smaller settlements to be completed by the end
of Quarter 1 in 2026.  
The Open Space Strategy is programmed to go to a meeting of the
Council’s Economy and Infrastructure Committee in August 2026.
A policy scoping exercise was completed in Quarter 3 2025, and a
draft policy framework will be ready for internal review by the end of
the year.
Open Space Audits are being completed alongside the Locality Profile
exercise, with tiered settlements being prioritised.
The audit has flagged locations where interventions are required. We
have determined that the settlement strategies to be included in the
OSS will be more effective to develop alongside LDP3. This enables us
to consider where growth will be directed and where we can
leverage on-site or off-site contributions to deliver requirements
identified in the audit.
As the Open Space Audit is still ongoing, only quantity figures have
been provided in this Evidence Report at this time.  This audit is
expected to be completed in early 2026 alongside LDP3’s locality
profiling exercise to inform the Proposed Plan.
 Play Sufficiency Assessment (PSA) Limitations - The PSA does not
include privately managed equipped play areas.  These will be
identified, assessed, and included in the PSA outputs to help address
the gaps in provision and accessibility.
The current Playground Strategy considers the 4-8 and 8-14 age
groups.  This has resulted in a data gap regarding provision of
activities for children and young people outwith this range.  The
Strategy recognises that there will be children on either side of the 4-
14 target age range that will use the equipment, but that younger
children require more supervised facilities, such as nurseries, and
older children seek other forms of play such as sporting, cycling and
skating opportunities.  The PSA only includes equipped playgrounds.
Statements of Agreement and/or Dispute:
8 responses were received on our Play, Recreation and Sport Topic Paper. 
Most respondents (6 out of 8) either agreed with or had no comment to
make on the evidence identified through Topic Paper 022, and the
summary of the implications of that evidence for the Proposed Plan
provided by the Council.  A number of respondents offered examples of
additional sources of information which they felt should be considered. 
There was 1 response on the issue which the respondent wished to be
treated as a formal dispute to the Evidence Report.  
A breakdown of those responses grouped under stakeholder categories is
provided below, and a full summary of these comments, their status, and
the Council’s response in the relevant table under the Play, Recreation and
Sport issue 014 in Appendix B.

Page 217

217
 Key Stakeholders:
o NatureScot, neither agreed nor disagreed.
o Scottish Water, neither agreed nor disagreed
o SportScotland, disputed the sufficiency of the list of
evidence / datasets identified in the topic paper and wish
for their comments to be registered as a formal dispute.
The dispute has been resolved by adding reference to the
Facilities Report 2024.
 Community Councils: 2 responses were received, 1 agreed and the
other disagreed (Earn Community Council) but did not wish their
response to be treated as a formal dispute
 Public at Large: 1 response, neither agreed nor disagreed.
 Landowners and Agents: 2 responses, neither of which agreed nor
disagreed.
 Other Bodies: No comments.
Assessment of Sufficiency of Play Opportunities:
Part 2, Section 16D(1) of the Planning Act 2019 requires planning
authorities, in the preparation of their Evidence Report, to include an
assessment of the sufficiency of play opportunities in its area for children. 
This is delivered through the preparation of the Council’s Play Sufficiency
Assessment.

Page 218

218
ISSUE 015: FLOOD RISK AND WATER MANAGEMENT (INCLUDING
DRAINAGE AND WATER SUPPLY SYSTEMS)
Links to Evidence:
Flood Risk
Strategic Flood Risk Assessment [Core Doc Ref: CD026]
SEPA Future Flood Maps (Core Doc Ref: B015_CD001)
SEPA Low likelihood (Present Day) Surface Water Flood Risk Mapping (Core
Doc Ref: B014_CD002)
Planning Information Note 4 (PIN4) SEPA Position on Development 
Protected by a Flood Protection Scheme (Core Doc Ref: B015_CD003)
SEPA Flood Risk Standing Advice for Planning Authorities (July 2024). (Core
Doc Ref: B015_CD004)
Scottish Government Flood Resilience Strategy (December 2024) (Core Doc
Ref: B015_CD004)
Scottish Water's Climate Adaptation Plan 2024 (Core Doc Ref: B015_CD006)
SEPA Flood Risk and Land Use Vulnerability Guidance (Core Doc Ref:
B015_CD007)
Strategic Environmental Assessment: Development Plan Site
Assessment(Core Doc Ref: B015_CD008)
Tay Flood Risk Management Plan (December 2021) (Core Doc Ref:
B015_CD009)
Forth Flood Risk Management Plan (December 2021) (Core Doc Ref:
B015_CD010)
Forth Estuary Flood Risk Management Plan (December 2021) (Core Doc Ref:
B015_CD011)
Tay Estuary and Montrose Basin Flood Risk Management Plan (December
2021) (Core Doc Ref: B015_CD012)
Tay Local Flood Risk Management Plan (December 2022) (Core Doc Ref:
B015_CD013)
Forth Local Flood Risk Management Plan (December 2022) (Core Doc Ref:
B015_CD014)
Forth Estuary Local Flood Risk Management Plan (December 2022) (Core
Doc Ref: B015_CD015)
Tay Estuary and Montrose Local Basin Flood Risk Management Plan
(Interim issue May 2019) (Core Doc Ref: B015_CD016)
Mapping flood disadvantage in Scotland 2015 (Core Doc Ref: B015_CD017)
SEPA, Explanatory note on the difference between our planning guidance
and the Future Flood Maps, Version 4 (November 2023) (Core Doc Ref:
B015_CD018)
Big Place Conversation Summary Report (Core Doc Ref: B015_CD019)
Perth and Kinross Strategic Flood Risk Assessment Map (Core Doc Ref:
B015_CD034)
Climate Change and Coastal Changes
Dynamic Coast Webmaps (2021) (Core Doc Ref: B015_CD020)
Coastal Change Adaptation Guidance (Core Doc Ref: B015_CD021)
Climate Change Risk and Opportunity Assessment (August 2023) (Core Doc
Ref: B015_CD022)
Climate Change Master Action Plan (August 2023) (Core Doc Ref:
B015_CD023)
River Basin Management Plans for Scotland (December 2021) (Core Doc Ref:
B015_CD024)
Recommended Riparian Corridor Layer for use in Land Use Planning (July
2024) (Core Doc Ref: B015_CD025)

Page 219

219
Water Environment
SEPA, Water Environment Hub (Core Doc Ref: B015_CD026)
SEPA, Water Classification Hub (Core Doc Ref: B015_CD027)
River Basin Management Plans for Scotland (December 2021) (Core Doc Ref:
B015_CD028)
Drinking Water Protected Areas - Scotland River Basin District Maps (Core
Doc Ref: B015_CD029)
Private Water Supplies
SEPA information on Water Scarcity (Core Doc Ref: B015_CD030)
Water Scarcity in Scotland (arcgis.com) (November 2023) knowledge
review on water scarcity by University of Dundee (Core Doc Ref:
B015_CD031)
James Hutton Institute Executive Summary of Climate Trends  (July 2023)
(Core Doc Ref: B015_CD032)
CREW (Centre for Expertise for Waters) Report, Private Water Supplies and
Climate Change(Core Doc Ref: B015_CD033)
PKC call out records to private water supplies which have previously dried
up (Core Doc Ref: B015_CD034)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue 015, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix B to this Evidence Report.  Chapter 6 also provides an
overview of the main issues of relevance to the development of LDP3. 
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue 015, it was
identified that:
 Flood Risk - Whilst if a site is within an at-risk area, the NPF4 policy
approach is clear, if a site is partially within, the approach is still
clear, but what is unclear, until you get to the planning application
stage, is which areas are within the at-risk area.  Also, whilst SEPA
medium likelihood future flood risk 2080 river and coastal flood risk
mapping is the best proxy for the at-risk flood risk areas mentioned
in NPF4, this is currently generally based on UK 2009 Climate
projections but will be updated to reflect the UK 2018 climate
change projections. Since preparation of the original Evidence
Report submission (which went to full Council on March 5th 2025),
SEPA updated their mapping on 12th March 2025. The most recent
SEPA Future Flood Maps v3.0 2025 includes surface water and small
watercourses flood maps which takes account of UK2018 Climate Change
projections, but the River and the Coastal maps are generally still based
on UK2009 Climate Change data.  If further updated climate change
mapping is available, it will be used in site assessment for the
Proposed Plan. The most up to date mapping will be used at time of
site assessment. It is noted that this March 2025 SEPA mapping is
included within a Perth and Kinross online Strategic Flood Risk
Assessment map. Should the Proposed Plan promote sites where a
potential flood risk is identified on part of the site, then it will be
necessary to assess them using the allowances to calculate the area
“at risk of flooding or in a flood risk area” and this will clarify the

Page 220

220
developable area.  To address this gap, during the preparation of
the Call for Sites and Ideas, the Council will require the
developer/landowner to prepare a Flood Risk Assessment (FRA)
where there is a potential risk of flooding within a site, to
determine if it is suitable for allocation.
Consideration of the research on mapping flooding disadvantage
suggests to properly implement policy and limit the instances of
development within at risk/floodplain areas, there could be an
enhanced focus on member engagement on flood risk matters. 
One of the other reasons mentioned (of sites taking time to come
forward and being based on an older FRA) is largely outwith the
Local Authorities control.  However, the approach taken at LDP2
site MU73: Almond Valley, whereby on this long term strategic site,
the overall masterplan permission requires each phase which
comes forward as a planning application to be based on a new FRA
could be a way to mitigate this issue.
 Water Environment - Findings of the Strategic Flood Risk
Assessment (SFRA) help identify some potential opportunities to
implement improvements to the water environment through
natural flood management and blue green infrastructure. 
However, the Proposed Plan Spatial Strategy will identify and
protect blue and green infrastructure assets and networks (via the
Planning (Scotland) Act 2019, and subsequently NPF4); and seek to
enhance and expand existing provision including new blue and/or
green infrastructure.  Blue and Green Infrastructure is considered in
more detail in Topic Paper 021, and the related issue 015 of this
Evidence Report.
 Private Water Supplies - The drought indicator method has not
been developed to assess individual Private Water Supplies and is
not provided at a finely grained resolution (12 Km).  However, the
drought indicator alongside other water scarcity mapping, and
Council call out records for water scarcity, could prove a useful
starting point to determine vulnerable locations.  It could
potentially help identify where a Private Water Supplies risk
assessment procedure considering climate change related risks is
required and/or where/when a planning response and mitigations
may be required.

Page 221

221
Statements of Agreement and/or Dispute:
18 responses were received on our Flood Risk and Water Management
Topic Paper.  Over 40% of the respondents either agreed with or neither
agreed nor disagreed with the evidence identified through Topic Paper
023, or the summary of the implications of that evidence for the Proposed
Plan provided by the Council.  A number offered examples of additional
sources of information which they felt should be considered and/or
highlighted other potential implications for the Proposed Plan.  
3 respondents wished for their comments to be treated as a formal dispute
to the Evidence Report, a further 6 indicated some disagreement with the
evidence.  A breakdown of those responses, grouped under stakeholder
categories, is provided below, and a full summary of these comments, their
status, and the Council’s response in the relevant table under the Flood
Risk and Water Management issue in Appendix B under Issue 015.
 Key Stakeholders:
o NatureScot, neither agreed nor disagreed
o Scottish Water, agreed
o SEPA, disputed the draft SFRA and wish for their comments to
be registered as a formal dispute due to the absence of the
mapped output from the detailed studies.
 Community Councils: 2 responses, both of which neither agreed
nor disagreed.
 Public at Large: 6 responses, 1 which agreed, 3 which disagreed but
did not wish for their comments to be recorded as formal disputes,
2 which disputed the evidence and wish for their comments to be
registered as a formal dispute.  1 of these formal disputes is on the
grounds that they consider the Craigie Burn Flood Study must be
redone using flow rate figures agreed with residents who have
knowledge in this field, and the other is because the topic paper
does not mention ‘deforestation’ for development impacting both
surface water and subterranean water flows, nor address the
impact of proposed and existing development on subterranean
aqua flows, especially in the Scone area.
 Landowners and Agents: 6 responses, 1 of which agreed, 3 neither
agreed nor disagreed, and 2 which disagreed but did not wish for
their comments to be recorded as a formal dispute (Montague
Evans on behalf of Loch Developments Ltd, and Stuart Buchanan on
behalf of Cardross Asset Management Ltd)
 Other Bodies: Homes for Scotland, disagreed but do not wish to
register as a formal dispute.

Page 222

222
ISSUE 016: HEALTH AND SAFETY
Links to Evidence:
Major Hazard sites
Perth and Kinross Local Development Plan (2019): maps shown in
Appendix 3 pages 338-346 (Core Doc Ref: B016_CD001)
Health and Safety Executive (HSE)'s Planning Advice Web App (Core Doc Ref:
B016_CD002)
Pipeline safeguarding
United Kingdom Onshore Pipeline Operators’ Association Good Practice
Guides (Core Doc Ref: B016_CD003)
Locations of concern for suicide
Suicide Prevention Action Plan (Core Doc Ref: B016_CD004)
National Guidance on Action to Address Suicides at Locations of Concern
(Core Doc Ref: B016_CD005)
Air Quality
Perth Air Quality Action Plan (2009)(Core Doc Ref: B016_CD006)
Crieff Air Quality Management Area revocation order (Core Doc Ref:
B016_CD007)
Air Quality Annual Progress Report (2024) (Core Doc Ref: B016_CD008)
Airfield Safeguarding
Perth and Kinross Local Development Plan Airfield Safeguarding 
Supplementary Guidance (2020) (Core Doc Ref: B016_CD009)
Scottish Government Planning Circular 2/2003 (revised) safeguarded
aerodromes, technical sites and military explosives areas (Core Doc Ref:
B016_CD010)
Coal mining
Mining Remediation Authority Planning maps (Core Doc Ref: B016_CD011)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue 016, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix B to this Evidence Report.  Chapter 6 also provides an
overview of the main issues of relevance to the development of LDP3. 
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue 016, it was
identified that:
 Safeguarding Zones around major hazard sites, major accident
pipelines, and airfields will need to be checked to ensure they
remain appropriate.
 Locations of concern for suicide risk will need to be sensitively
taken into consideration when preparing the Proposed Plan. 
 Once published, the measures contained in the Perth Air Quality
Management Plan will need to be incorporated into the Proposed
Plan.

Page 223

223
Statements of Agreement and/or Dispute:
3 responses were received on our Health and Safety Topic Paper.  1
response was from The Coal Authority (now the Mining Remediation
Authority) who neither agreed nor disagreed with the list of evidence and
summary of implications; 1 submitted on behalf of Shell UK, one of the
major hazard pipeline operators, who agreed; and the other on behalf of a
Community Council who neither agreed nor disagreed.  There were no
responses which the respondents wished to be treated as a formal dispute
to this Evidence Report.
A full summary of these comments, their status, and the Council’s
response is provided in the relevant table under the Health and Safety
issue 016 in Appendix B.

Page 224

224
HOMES

Page 225

225
HOMES 
5.5.1 Although the ‘Homes’ issue (017) is grouped within the Liveable
Places theme of NPF4’s National Planning Policy suite, i.e. Policy 16:
Quality Homes and Policy 17: Rural Homes, given the significance of
this issue to the overall development of the Proposed Plan, it was
viewed useful to set out the key information relating to the
consideration of the evidence and engagement feedback for this
issue under a separate section.   
5.5.2 The pages to follow provide an overview of the identified gaps,
uncertainties or key issues in the evidence gathered for the Homes
issue, and a summary of agreement, and/or disputes related to the
evidence which were received through our programme of
participation and engagement reported under Chapter 3. 
5.5.3 In terms of the requirements of the Planning Act, in the preparation
of this Evidence Report, the Council is expected to provide its views
on the housing needs of the population of the Plan Area (including,
in particular, the needs of persons undertaking further and higher
education, older people, and disabled people);  the availability of
land within the area for housing (including for older people, and
disabled people), and the desirability of allocating land for the
purposes of resettlement.  
5.5.4 The Council is also expected to provide a summary of action taken
to support and promote the construction and adaptation of
housing to meet the housing needs of older people and disabled
people in their area, and an analysis of the extent to which the
action has helped to meet those needs, and also the action taken
by the Council to meet the accommodation needs of
Gypsies/Travellers in the Plan Area, and an analysis of the extent to
which the action has helped to meet those needs.   
5.5.5 The specific requirements outlined under paragraphs 5.5.3 and
5.5.4 above have been addressed under the Homes issue 017 to
follow, after the ‘Statements of Agreement and/or Dispute’ section.

Page 226

226
ISSUE 017: HOMES
Links to Evidence:
Housing to 2040 (Core Doc Ref: B017_CD001)
Perth and Kinross HMP HNDA Final Report (Core Doc Ref: CD028)
NPF4 Annex E MATHLR (Core Doc Ref: C017_CD002)
NPF4 Perth and Kinross MATHLR Assessment Report (Core Doc Ref:
C017_CD003)
TAYplan2 Strategic Development Plan Examination Report (Core Doc Ref:
C017_CD004)
Perth and Kinross LHS Framework 2022-27 (Core Doc Ref: B017_CD005)
Perth and Kinross LHS 2022-2027 Appendix: HST 2022+ (Core Doc Ref:
C017_CD006)
Perth and Kinross LHS 2022-27 Annual Progress Report 2022/23 and
2023/24 (Core Doc Ref: C017_CD007)
PKC SHIP 2025/26 – 2029/30 (Core Doc Ref: C017_CD008)
PKC STLs Evidence Research Report (Core Doc Ref: C017_CD009)
Existing Housing Need in Perth and Kinross – Report commissioned by
Homes for Scotland (Core Doc Ref: C017_CD010)
Extract from the PKC Self and Custom Build Register (Core Doc Ref:
C017_CD011)
Perth and Kinross HLA – 2022 (Core Doc Ref: C017_CD012)
Perth and Kinross HLA-  2023 (Core Doc Ref: C017_CD013)
Edinburgh City Council HLA and Completions Programme 2022 p.11-13
(Core Doc Ref: C017_CD014)
Briefing Paper: The Barriers to Housing Delivery (Core Doc Ref: C017_CD015)
The Scottish Land Commission: The role of land in enabling new housing
supply in rural Scotland (Core Doc Ref: C017_CD016)
Planning and the Housing Emergency – Delivery Plan (Core Doc Ref:
C017_CD017)
Perth and Kinross LDP2 (Core Doc Ref: C017_CD018)
BPC - Results (Core Doc Ref: C017_CD019)
Gypsy Travellers – Double Dykes Human Rights Monitoring Report (Core
Doc Ref: CD021)
Gypsy Travellers – Double Dykes Second Human Rights Monitoring Report
(Core Doc Ref: CD022)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix A to this Evidence Report.  Chapter 6 also provides
an overview of the main issues of relevance to the development of LDP3. 
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue, it was
identified that:
 Short Term Lets (STL) - More analysis is needed on the impact of
residential properties as holiday accommodation.  Data will become
available on the potential for impact from the higher Council tax
levy on second homes and the STL Licencing requirements on
properties moving from STLs to second homes, to inform the
preparation of the final Local Housing Land Requirement (LHLR) in
the Proposed Plan.
 Gypsy/ Travellers and Travelling Showpeople - A specific
instruction in NPF4 is for LDPs to allocate land for Gypsy / Travellers
and Travelling Showpeople where need is identified.  The Housing
Needs and Demand Assessment (HNDA) concluded that over a 5-

Page 227

227
year period there would be a -2 shortfall to +4 surplus in
permanent Gypsy/Traveller site pitches.  This was, however, based
on 2016 data and is qualified by uncertainties in estimating
demand.  In relation to Travelling Showpeople, the HNDA referred
to the then draft 2022-27 Local Housing Strategy (LHS) which had
no evidence on the needs of Travelling Showpeople to support
estimating future requirements.  It is acknowledged that the data
relating to the accommodation needs of Gypsy / Travellers and
Travelling Showpeople is in need of updating.  The Council has
appointed a consultant to undertake the assessment and delivery
of the assessment is expected March 2026. The updated needs
assessment will inform the final LHLR in the Proposed Plan.
 Deliverability of Land Supply - Every year the audit is discussed
with Homes for Scotland with a view to achieving consensus on
individual site programming.  With the changes brought about by
the new planning system it was a more complicated process when
discussing the 2023 Housing Land Audit (HLA), especially given that
the 10-year housing land pipeline is not yet in place.  As a result, it
was not possible to reach agreement on the programming of four
sites within the 2023 audit, all of which Homes for Scotland
consider constrained and should not be programmed within the 10-
year period.  Whilst this is far from ideal there will be further
opportunities for discussion with Homes for Scotland and their
members through the preparation of subsequent audits which will
inform the preparation of the final LHLR in the Proposed Plan.
The consideration of factors affecting delivery as used by Edinburgh
City Council is still at an early stage and only some sites in the HLA
have been discussed in draft form with Homes for Scotland as a
pilot exercise in 2023.  This highlighted that it may be appropriate
to adapt the Edinburgh approach to more closely reflect some of
the factors applicable in Perth and Kinross before rolling this out as
a formal part of the HLA process.  It is proposed that this will be
carried out for future HLAs and will therefore be in place to inform
the final Local Housing Land Requirement (LHLR) in the Proposed
Plan.

Page 228

228
Statements of Agreement and/or Dispute:
11 responses were received on the Homes Topic Paper.  Just over half of
respondents either agreed with or had no comment to make on the
evidence identified through Topic Paper 020, and the summary of the
implications of that evidence for the Proposed Plan provided by the
Council.  A number offered examples of additional sources of information
which they felt should be considered and / or highlighted other potential
implications for the Proposed Plan.   There were 3 responses on the issue
which the respondents wished to be treated as a formal dispute to the
Evidence Report and 1 comment where the respondents indicated that
they disagreed with the evidence but did not wish for their response to be
treated as a formal dispute.
A full summary of these comments, their status, and the Council’s
response are provided in the table relevant table under this issue 017 in
Appendix C.  A breakdown of those responses grouped under stakeholder
categories is provided below.
 Key Stakeholders:  
o Tactran Regional Transportation Partnership did not
specifically state in their response for their agreed or
disagreed with the list of evidence considered and summary
of implications provided.  Under the further comments
section of the engagement questionnaire they noted that it
is difficult to understand the scale of the problem and the
potential impact new development can have on quality
homes without knowing the baseline data in relation to
(traffic related) noise levels, air quality (especially in
declared Air Quality Management Areas (Perth), and
accident statistics. 
o Scottish Water, neither agreed nor disagreed and made no
comments with regard to the Homes Topic Paper.    
 Community Councils: 3 responses, 2 agreed and the third neither
agreed nor disagreed
 Public At Large: 1 response which disputed the evidence and wish
for their comments to be registered as a formal dispute on the
grounds that that using data from a self-interested source – Homes
for Scotland – distorts the report.
 Landowners and Agents:  4 responses, 2 of which neither agreed
nor disagreed, 1 (Ristol Consulting) which disagreed but did not
wish for their comments to be recorded as a formal dispute, and 1
(Savills on behalf of Scone Estate) which disputed the evidence and
wish for their comments to be registered as a formal dispute on the
grounds that: data to be used to reflect Self and custom build
demand/need, a lack of acknowledgement of the facilitatory role of
housing in meeting other spatial strategy aims, and the need for a
balanced approach to use of NPF4 policies to ensure appropriate
and increased delivery of rural housing..
 Other Bodies:  Homes for Scotland wish to formally dispute the
evidence and summary of implications for the Homes issue of this
Evidence Report on the grounds that the MATHLR is to be
exceeded.

Page 229

229
The Housing Needs of the Population of the Area
Part 2, Section 16B(3) and Section 15(5)(ca) of the Planning Act 2019
requires planning authorities, in the preparation of their Evidence Report,
to set out their views on the housing needs of the population of the area
(including, in particular, the needs of persons undertaking further and
higher education, older people, and disabled people).  
With respect to the Perth and Kinross Area, the Housing Needs and
Demand Assessment (HNDA) calculation combines the components of
housing need to create a 20-year range of housing estimates for Perth and
Kinross as follows: 
• There is an estimated need for around 5,400 – 6,500 houses over the
20-year period of the HNDA.
• Approximately 1,500 households may require housing for older
people.
• Up to 3,200 households may require a more accessible form of
housing, 640 households may require wheelchair accessible housing.
• There is a backlog demand of 50 students in education requiring
accommodation.
The Availability of Land for Housing
Part 2, Section 16B(3) and Section 15(5)(cb) of the Planning Act 2019
requires planning authorities, in the preparation of their Evidence Report,
to set out their views on the availability of land in the district for housing,
including for older people, and disabled people.  
With respect to the Perth and Kinross Area, there is an agreed land supply
for housing of nearly 17,000 units.  This means that, in very simplistic
terms, there is enough non-constrained housing land to last nearly 20
years at a build rate of 850 units per year (the annualised MATHLR).  This is
almost double the 10-year LDP period.  It is acknowledged, however, that
this is not a straightforward calculation and that ultimately it is the
bringing forward for development of that non-constrained land supply
which results in the end delivery of houses on the ground.
Construction and Adaptation of Housing
Part 2, Section 16B(3)(b)(i) and (ii) of the Planning Act 2019 requires
planning authorities, in the preparation of their Evidence Report, to
provide a summary of the action taken by them to support and promote
the construction and adaptation of housing to meet the housing needs of
older people and disabled people in their area, and an analysis of the
extent to which the action has helped to meet those needs.  
With respect to the Perth and Kinross Area, the Local Housing Strategy
(LHS) and Strategic Housing Investment Plan (SHIP) are the primary
vehicles for the delivery of housing for specific groups which require
affordable housing.  The LHS Annual Progress Report discussed in the
summary of evidence section under issue 017, Appendix C, sets out the
achievements so far in relation to meeting the needs for affordable
housing generally, and of older people and disabled people in Perth and
Kinross specifically.  As identified in the SHIP, the Council is committed to
increasing the supply of wheelchair accessible housing and is aiming for
10% of homes built to be suitable for people with particular needs where
this can be met within affordable housing development sites.

Page 230

230
Existing LDP2 Policy 22: Particular Needs Housing Accommodation
supports proposals for residential developments supporting housing for
particular needs such as housing for frail or elderly people, people with
additional support needs, and housing for varying needs.  Houses in
multiple occupation are also supported where a need for such
accommodation can be demonstrated. 
In relation to the backlog demand of 50 students in education requiring
accommodation, the Draft Perth City Centre Development and Design
Framework identifies the ‘University Quarter’ as one of the proposed
investment areas for the City.  It refers to a new vision for the University
Campus ‘Quarter’ which is to provide a new framework which will deliver a
new educational facility for primary / secondary / further and higher
education in one campus location.  This will be developed alongside other
ancillary uses, but no reference is made to providing more student
accommodation on site.  Planning permission was granted in 2019 to
convert and extend an existing retail unit in Perth City Centre to student
accommodation comprising 47 bedrooms, 30 studios and associated
communal facilities but the permission has not been implemented. 
Further discussion will therefore be needed with the College to understand
any outstanding accommodation requirements.
Policy 25: Housing Mix requires that the market element of all sites with a
total capacity of 20 or more provide an appropriate mix of house types and
sizes and meet the needs of smaller households including older people and
lower income households by providing at least 10% of their units as one- or
two-bedroom homes.  This is in addition to any affordable housing
requirements on the site.  Furthermore, ‘where there are identified
clusters of households with specific housing needs within the settlement,
such as housing for wheelchair users, there may be a requirement for up to
10% of the development to be designed to meet these specific identified
needs or for the developer to demonstrate that the house is capable of
adaptation’.  There were no specific site allocations for housing for older
people or disabled people in LDP2.
These policies have been used in assessing planning applications since the
adoption of LDP2 (November 2019).  Policy 22 in particular has helped
facilitate the development of a residential assisted living scheme for over
55s, a change in house type to allow for a specialist need bungalow to be
provided on a larger scheme, assisted living units, and a 10-unit Housing in
Multiple Occupation (HMO) aimed at providing student accommodation.
Accommodation Needs for Gypsies/Travellers
Part 2, Section 16B(3)(b)(i) and (ii) of the Planning Act 2019 requires
planning authorities, in the preparation of their Evidence Report, to
provide a summary of the action taken by them to meet the
accommodation needs of Gypsies/Travellers in their area, and an analysis
of the extent to which the action has helped to meet those needs.   
With respect to the Perth and Kinross Area, LDP Policy 21: Gypsy /
Travellers’ Sites protects existing authorised sites with a presumption
against their conversion to another use.  The policy also supports proposals
for new permanent sites and temporary short stay sites and sets out the

Page 231

231
criteria against which such proposals will be assessed.  There were no
specific site allocations for new Gypsy / Travellers’ sites in LDP2, although
the settlement boundary of Greenacres private site was drawn to allow for
expansion.  Only a small number of planning applications have been
submitted relating to Policy 21 during the lifetime of the Plan.  Most
notably permission was granted for replacement chalets on an existing
Gypsy / Travellers site, and permission refused for an extension to another
small existing Gypsy / Traveller site on health and safety grounds. 
The Local Housing Strategy (LHS) Annual Progress Report discussed in the
summary of evidence section under issue 017, Appendix C, sets out the
achievements so far in relation to meeting the accommodation needs of
Gypsies and Travellers in Perth and Kinross.  Also, as previously mentioned
in the ‘Any Gaps, Uncertainties, and Key Issues Raised…’ section, the HNDA
data relating to Gypsy / Traveller needs dates from 2016.  The 2016 report
indicated a need to explore provision of transit sites.  As a result, the
Council has committed funding to and is currently progressing a 10-pitch
transit site in Perth.  Although there are no plans in the current Strategic
Housing Investment Plan (SHIP) for affordable homes for Gypsy /
Travellers, work is progressing to establish the unmet needs of transient
Gypsy / Travellers, and working with community members to have a better
understanding of their accommodation needs and preferences is identified
as an action in LHS.  Further detail on this is set out in the Gaps or
Uncertainties in Data section of the Homes issue 017, Appendix C.

Page 232

232
INFRASTRUCTURE AND TRANSPORTATION

Page 233

233
INFRASTRUCTURE AND TRANSPORTATION
5.6.1 The Town and Country Planning (Scotland) Act 1997, as amended
by the Planning (Scotland) Act 2019 [the Act] sets out a number of
requirements with regards to the content of the Evidence Report
and the issue of Infrastructure and Transportation.  These specific
requirements are listed below and addressed under the sub-issue
headings of Cemetery Provision (018); Communications and
Digital (019); Education Facilities (020); Healthcare (021);
Transportation (including Sustainable Transport) (022), and Waste
Water Treatment and Water Supply (023), in the pages to follow.  
5.6.2 Please note, Chapter 6 provides an overview of the main issues of
relevance to the development of LDP3, and Appendix D covers
these individual issues in detail, and should be read alongside
Chapter 5. 
• Part 2, Section 16B(3) and Section 15(5)(cd) - The planning
authority’s views on the health needs of the population of the
district and the likely effects of development and use of land on
those health needs.
• Part 2, Section 16B(3) and Section 15(5)(ce) - The planning
authority’s views on the education needs of the population of
the district and the likely effects of development and use of
land on those education needs.
• Part 2, Section 16B(3) and Section 15(5)(cg) - The planning
authority’s views on the capacity of education services in the
district.
• Part 2, Section 16B(3) and Section 15(5)(d) - The planning
authority’s views on the infrastructure of the district (including
communications, transport and drainage systems, systems for
the supply of water and energy , and health care and education
facilities).
• Part 2, Section 16B(3) and Section 15(5)(e) - The planning
authority’s views on how that infrastructure is used.

Page 234

234
Issue 018: Infrastructure – Cemetery Provision
Links to Evidence:
Perth and Kinross Council, Existing Burial Ground Sites (Core Doc Ref:
D018_CD001)
Perth and Kinross Council, Future Cemetery Provision Strategy (2016) (Core
Doc Ref: D018_CD002)
SEPA Guidance on Assessing the Impacts of Cemeteries on Groundwater
(Core Doc Ref: D018_CD003)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix D to this Evidence Report.  Chapter 6 also provides
an overview of the main issues of relevance to the development of LDP3. 
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue, it was
identified that finding suitable land for potential burial ground/cemetery
provision will potentially compete with other demands on land such as
housing, particularly close to existing settlements.  There may be an
opportunity for mixed use sites to help deliver cemetery provision
alongside other appropriate land uses.  The demand for additional
burial/cemetery provision will need to inform the Spatial Strategy for the
Proposed Plan to ensure suitable sites are identified, where required.
Statements of Agreement and/or Dispute:
2 responses were received on our Infrastructure - Cemetery Provision
Topic Paper.  Both responses noted that they neither agreed nor disagreed
with the list of evidence evaluated and the summary of implications for the
Proposed Plan provided, and neither wished for their comments to be
registered as a formal dispute to this Evidence Report. 
A breakdown of those responses grouped under stakeholder categories is
provided below, and a full summary of these comments, their status, and
the Council’s response in the relevant table under the Infrastructure –
Cemetery Provision issue 018 in Appendix D.
 Key Stakeholders: No comments were received.
 Community Councils: 1 response from Aberfeldy Community
Council who neither agreed nor disagreed, but did highlight that
the Community Council is actively exploring with the Council’s
Bereavement Services a new site in Aberfeldy for additional burial
provision.
 Public at Large: No comments were received.
 Landowners and Agents: 1 response from Gray Planning and
Development Ltd. on behalf of GS Brown Construction who
commented that in the context of LDP3 supporting the
identification of potentially suitable sites for extended or new
cemetery provision, landowners with assets suitable for a mix of
land uses potentially led by housing have a key role and can offer
deliverable solutions to this matter.
 Other Bodies: No comments received.

Page 235

235
Issue 019: Infrastructure – Communications and Digital Infrastructure
Links to Evidence:
Ofcom ‘Connected Nations’ 2023 Scotland Report (Core Doc Ref:
D019_CD001)
Ofcom ‘Connected Nations’ 2023 Interactive Report Dashboard (Core Doc
Ref: D019_CD002)
Perth and Kinross Council, Public Wi-Fi Map (Core Doc Ref: D019_CD003)
Signal Checker – Perth and Kinross (Core Doc Ref: D019_CD004)
Digital Scotland, Superfast Broadband Report 2020  (Core Doc Ref:
D019_CD005)
Digital Scotland, R100 Programme Strategy (Core Doc Ref: D019_CD006)
Scottish Government, A changing nation, how Scotland will thrive in a
digital world (Core Doc Ref: D019_CD007)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix D to this Evidence Report.  Chapter 6 also provides
an overview of the main issues of relevance to the development of LDP3. 
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue, no data gaps
have been identified. 
The key issues raised are:
 The communications and digital infrastructure of the Proposed Plan
area has shortcomings, creating competitive disadvantages for local
businesses and communities; and
 the Proposed Plan will need to encourage initiatives to improve
digital connectivity
Statements of Agreement and/or Dispute:
1 response was received on our Infrastructure - Communications and
Digital Infrastructure Topic Paper.  The response gave settlement-specific
comments on broadband improvements and noted that they neither
agreed nor disagreed with the list of evidence and the summary of
implications for the Proposed Plan. There were no formal disputes.

Page 236

236
Views on the Infrastructure of the Area
Under Part 2, Section 16B(3) and Section 15(5)(d)-(e) of the Planning Act
2019, in the preparation of their Evidence Report, planning authorities are
required to provide their views on the infrastructure of the plan area, and
how that infrastructure is used.
The Perth and Kinross Area currently have lower than the national average
coverage for full fibre broadband.  There is also a network of public Wi-Fi
hotspots across the Local Authority Area.  Perth and Kinross are ranked
76th of 96 areas in the UK for mobile services coverage (4G/ 5G).
With respect to the Perth and Kinross Area the data provided highlights
current shortcomings regarding digital connectivity.  This creates
competitive disadvantages for local businesses and communities,
presenting a clear challenge for Perth and Kinross to meet some of its
corporate objectives.  It will be necessary to establish positions of clear
support to development proposals that enhance digital capacity while
observing the principles of sustainable and desirable development.

Page 237

237
Issue 020: Infrastructure – Education Facilities
Links to Evidence:
National Records of Scotland 
Population Estimates 2022 (Core Doc Ref: D020_CD001)
Perth and Kinross Council 
Learning Estate Strategy 2021 (Core Doc Ref: D020_CD002)
Learning Estate Management Plan 2021 (Core Doc Ref: D020_CD003)
Housing Land Audits (Core Doc Ref: D020_CD004)
Methodology for Calculating Pupil Product Ratio (Core Doc Ref: D020_CD005)
Scottish Government 
School Education Statistics 2024 (Core Doc Ref: D020_CD006)
Infrastructure Investment Plan 2025-26 (Core Doc Ref: D020_CD007)
Pupil Projections 2022-27 (Core Doc Ref: D020_CD008)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix D to this Evidence Report.  Chapter 6 also provides
an overview of the main issues of relevance to the development of LDP3.
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under Issue 020, it was
identified that:
 Infrastructure requirements, in this case, additional school roll
capacity, which are needed to accommodate new development
proposals for LDP3 will be assessed by the Council through
reviewing individual primary catchment areas and capacity across
the relevant secondary cluster. 
 Forecasting pupil numbers is difficult to undertake with precision.
Programming accurate housing completions, via the Housing Land
Audit, is essential to planning for investment in the learning estate.
Related to programming future development is estimating pupil
generation from new developments. 
 The methodology for calculating the ‘Pupil Product Ratio’ was
developed in 2008 and a redrafting of this is underway to ensure
this forecasting is informed by relevant data.

Page 238

238
Statements of Agreement and/or Dispute:
 Key Stakeholders: PKC Property (Education) Services provided
feedback on the Topic Paper, agreeing with the evidence, and
assisted with the preparation of the Evidence Report.
 Community Councils: 1 response from Earn Community Council,
neither agreeing nor disputing the proposed evidence, highlighting
the importance of NPF4 Policy 18 for Transport and Health.
 Public at Large: No comments were received.
 Landowners and Agents: Homes for Scotland neither agreed nor
disputed the proposed evidence, submitting suggestions as to how
Education forecasting should be taken forward in LDP3.
 Other Bodies: No comments received.
 A full summary of these comments, their status, and the Council’s
response in the relevant table under the Infrastructure – Education
Facilities issue in Appendix D.
 No disputes were raised.

Page 239

239
Education Services Capacity
Part 2, Section 16B(3) and Section 15(5)(cg) and (e) of the Planning Act
2019, in the preparation of their Evidence Report, require planning
authorities to set out their views on the capacity of education services in
the plan area, and how that infrastructure is used.  
The Perth and Kinross Learning Estate comprises 69 primary schools, 11
secondary schools, 1 stand-alone Nursery, and 1 Additional Support Needs
(ASN) school.
Between 2001 and 2021, the ‘0 to 15’ age group saw the largest
percentage decrease (-5.2%). Over the next 10 years, the population of
Perth and Kinross is projected to decrease by 3.5% due to natural change
(more deaths than births).  The number of school-age children in the area
is not expected to increase in population projections.  
 Early Years: Education and Learning Services anticipate that Early
Years infrastructure can continue to accommodate children, based
on population changes and housebuilding activity.
 Primary Schools: latest School Estate Statistics found that some
primary schools in Perth and Kinross have particularly low pupil
numbers (11 schools at less than 50% of capacity) and some have
high capacity (5 schools at 90-100% of capacity), however no
schools are currently over-subscribed (roll greater than capacity). 
 Secondary Schools: latest School Estate Statistics found that
secondary school pupil rolls in Perth and Kinross have increased in
number since 2017, consistent with patterns across Scotland. 
There are 11 secondary schools in Perth and Kinross, and the
School Estates Statistics found that one school has a roll less than
50% of capacity and one school has a roll 90-100% of capacity,
again with no schools currently over-subscribed.
 Additional Support Needs: Perth and Kinross have one specialist
Additional Support Needs (ASN) school; Fairview School is a
purpose-built special education school that serves children and
young people aged 3 to 18 years old with profound and complex
ASN.  The school has a capacity of 65 pupils and operates at full
capacity most years.
Information on school rolls, pupil projections, and housing completions
will be utilised in the preparation of Proposed LDP3. 
The Learning Estate Strategy, Learning Estate Management Plan, and
Corporate Asset Management Plan are relevant in determining Council
priorities for investment within certain catchment areas.  Revisions or
updates to these documents will be referenced as they become
available.

Page 240

240
Issue 021: Infrastructure – Health Care Facilities
Links to Evidence:
Public Health Scotland
Strategic Plan 2022-25 (Core Doc Ref: D021_CD001)
General Practice In-hours Activity Visualisation (2024)  (Core Doc Ref:
D021_CD002)
Health Impact Assessment guidance (Core Doc Ref: D021_CD003)
NHS Dental data monitoring (2024) (Core Doc Ref: D021_CD004)
NHS Inform
Pharmacy service directory (Core Doc Ref: D021_CD005)
Dental service directory (Core Doc Ref: D021_CD006)
NHS Scotland
North Regions Regional Asset Management Plan 2019-2029 (Core Doc Ref:
D021_CD007)
NHS Tayside 
Director of Public Health Annual Report 2023 (Core Doc Ref: D021_CD008)
Annual Audit Report 2023/24 (Audit Scotland) (Core Doc Ref: D021_CD009)
Anchor Strategy 2023 (Core Doc Ref: D021_CD010)
NHS Tayside new dental patients list (Core Doc Ref: D021_CD011)
Perth and Kinross Health and Social Care Partnership
Integration Joint Board Strategic Commissioning Plan 2020-25 (Core Doc
Ref: D021_CD012)
Joint Strategic Needs Assessment 2023 (Core Doc Ref: D021_CD013)
Primary Care Premises Strategy 2023-2028 (Core Doc Ref: D021_CD014)
Strategic Delivery Plan 2023-2026 (Core Doc Ref: D021_CD015)
Perth and Kinross General Practice lists (Core Doc Ref: D021_CD016)
Perth and Kinross Community Planning Partnership 
Community Plan (LOIP) 2022-2032 (Core Doc Ref: D021_CD017)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix D to this Evidence Report.  Chapter 6 also provides
an overview of the main issues of relevance to the development of LDP3. 
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue, it was
identified that:
 Engagement with NHS Tayside and Perth and Kinross Health and
Social Care Partnership through the preparation of the Evidence
Report identified some uncertainties regarding healthcare premises
capacity/ needs for Perth and Kinross.  Improved understanding of
healthcare infrastructure needs will be developed through working
with health authorities in the preparation of LDP3, in terms of NPF4
Policy 18. 
 Funding options for new healthcare infrastructure, to be identified
by the health authorities, will need to be carefully considered when
preparing the new Spatial Strategy for Perth and Kinross, including
requirements of developers (financial or in-kind).  Healthcare
infrastructure is not presently included in the scope of the Council’s
developer contributions policy.

Page 241

241
Statements of Agreement and/or Dispute:
4 responses were received on the Health Care Facilities section of our
Infrastructure Topic Paper.  1 response neither agreed nor disagreed with
the list of evidence evaluated or summary of implications for the Proposed
Plan provided.  1 disagreed but did not wish for their comments to be
registered as a formal dispute to the Evidence Report.  1 agreed, and the
other wishes to register their comments as a formal dispute. 
A breakdown of those responses grouped under stakeholder categories is
provided below, and a full summary of these comments, their status, and
the Council’s response in the relevant table under the Infrastructure –
Health Care Facilities issue in Appendix D.
 Key Stakeholders: A response was received from Perth and Kinross
Health and Social Care Partnership (PKHSCP) on this issue.  They
neither agreed nor disagreed with the list of evidence reviewed or
summary of implications provided.  They did however make some
points of clarification regarding terminology used and also figures
reported for the number of GP practices within Perth and Kinross. 
PKHSCP also suggested some additional sources of evidence for
review.  
 Community Councils: 1 response from Earn Community Council
who agreed with the list of evidence and summary of implications
and made some suggestions regarding connections with other NPF4
policies and this issue. 
 Public at Large: 1 response received, which the respondent wishes
to register as a formal dispute to the Evidence Report based on the
poor quality of graphics online. 
 Landowners and Agents: No comments received. 
 Other Bodies: Homes for Scotland disagreed with the list of
evidence evaluated and made some suggestions for additional
sources of evidence to include.  They did not wish for their
response to be registered as a formal dispute to the Evidence
Report.
Views on the Infrastructure of the Area
Under Part 2, Section 16B(3) and Section 15(5)(d)-(e) of the Planning Act
2019, in the preparation of their Evidence Report, planning authorities are
required to provide their views on the infrastructure of the plan area, and
how that infrastructure is used.
Key general healthcare facilities in Perth and Kinross comprise:
 23 General Practices
 36 pharmacies
 27 dental practices
 2 hospitals.
With respect to the Perth and Kinross Area there are ample sources of
evidence relating to the local population and the health needs in the area.  
Health agencies are prioritising an approach of ‘prevention’ for improving
public health in which the Plan’s Spatial Strategy can align, together with
NPF4 Policy 23 requirements.  
The availability of evidence relating to physical healthcare infrastructure
and premises requirements in the Tayside Area is currently limited.  Perth

Page 242

242
and Kinross Council will utilise data on primary care infrastructure as it
becomes available.

Page 243

243
Issue 022: Infrastructure – Transportation (Including Sustainable
Transport)
Links to Evidence:
Scottish Government National Transport Strategy 2 (Core Doc Ref:
D022_CD001)
Transport Scotland Strategic Transport Projects Review 2 (Core Doc Ref:
D022_CD002)
Scottish Government Climate Change Plan update 2018-2032 (Core Doc Ref:
D022_CD003)
Transport Scotland route map to achieve a 20 per cent reduction in car
kilometres by 2030 (Core Doc Ref: D022_CD004)
Tactran Achieving a 20% Reduction in Car-km: Options for the Tractan
Region (Core Doc Ref: D022_CD005)
Tactran Regional Transport Strategy documents (Core Doc Ref: D022_CD006)
Tactran Regional Active Travel Network (Core Doc Ref: D022_CD007)
Tayside Bus Alliance Bus Improvements Detailed Options Appraisal (Core
Doc Ref: D022_CD008)
Transport Scotland Active Travel Vision (Core Doc Ref: D022_CD009)
Transport Scotland Active Travel Framework (Core Doc Ref: D022_CD010)
Transport Scotland Rail Services Decarbonisation Action Plan (Core Doc Ref:
D022_CD011)
Scottish Government National Walking Strategy (Core Doc Ref: D022_CD012)
PKC Mobility Strategy main issues report 2023 (Core Doc Ref: D022_CD013)
PKC Mobility Strategy  (Core Doc Ref: D022_CD014)
PKC Mobility Strategy Action Plan (Core Doc Ref: D022_CD015)
PKC Kinross-shire Active Travel Masterplan (Core Doc Ref: D022_CD016)
Perth Traffic Appraisal Network Monitoring study (Core Doc Ref:
D022_CD017)
Electric Vehicle Infrastructure Fund Strategy and Expansion Plan (Core Doc
Ref: D022_CD018)
PKC Briefing to elected members January 2025 - Initial results of Perth
parking survey (Core Doc Ref: D022_CD019)
Scottish Household Survey - Transport and Travel in Scotland (findings
2022) (Core Doc Ref: D022_CD020)
Scotland's Road Safety Framework to 2030 (Core Doc Ref: D022_CD021)
Sustrans Walking and Cycling Index 2023 (Core Doc Ref: D022_CD022)
Sustrans Hands Up Scotland Survey (Core Doc Ref: D022_CD023)
Datasets
Transport Scotland Scottish Transport Statistics 2023 (Core Doc Ref:
D022_CD024)
Scotland's Census 2022 (Core Doc Ref: D022_CD025)
Scottish Household Survey results (Core Doc Ref: D022_CD026)
UK Department for Transport road traffic statistics (Core Doc Ref:
D022_CD027)
UK Department for Transport vehicle licensing statistics (Core Doc Ref:
D022_CD028)
UK Department for Business, Energy & Industrial Strategy UK local
authority and regional greenhouse gas emissions statistics, 2005 to 2022
(Core Doc Ref: D022_CD029)
Statista: UK working habits (Core Doc Ref: D022_CD030)

Page 244

244
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix D to this Evidence Report.  Chapter 6 also provides
an overview of the main issues of relevance to the development of LDP3. 
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue 022, it was
identified that:
 Data Gaps - Some of the datasets used are aged and would benefit
from more up to date information.  The Council will engage with
Transport Scotland or any other relevant data owners to obtain the
most accurate and relevant information available for use in informing
the development of the Proposed Plan.
The Council will work to identify, update, and address those gaps in
data during the preparation of the Transport Appraisal, engaging
with Transport Scotland to outline opportunities to streamline
collaboration.  We will ensure we gain relevant insight on journey
times and delay times specific for the Perth and Kinross road
network, with attention to cross boundary factors that can influence
this performance and reliability metrics. 
The Transport Appraisal work will include the necessary measures to
address gaps related to the quality, frequency and accessibility of
public transport services.  We expect our Public Transport Team to
have fully developed the route and patronage database and will use
this to support the definition of suitable areas for development that
reduce the reliance on the private car and enable sustainable travel
choices.
 Uncertainties - The development of transport infrastructure is often
dependent on a combination of funding sources.  The Council’s
commitment and financial contribution generally requires the use of
external funding.  Consequently, there is a degree of uncertainty
regarding the availability of sufficient financial support at national
and regional levels.  This may impact the delivery of projects that,
under the Infrastructure First principle, could threaten the viability of
development.
As illustrated in the analysis of specific modes under issue 022 in
Appendix D, the key transport routes serving settlements within
Perth and Kinross are also linked to areas in the neighbouring local
authorities.  The performance of the network, and the ability to
deliver improvements to the regional infrastructure, will often
depend on the ability for Perth and Kinross Council to coordinate
work with other organisations.
Lastly, there is significant uncertainty surrounding the wider
transport industry with regards to the evolution of working and
commuting patterns.  While these travel behaviours appear more
stable when compared to recent years, it is unclear whether the
existing trends of hybrid working will remain unchanged.  Variations

Page 245

245
to these arrangements can create significant changes to travel
behaviour, shaping demand on specific modes.  These uncertainties
should be considered when appraising development opportunities at
later stages of the LDP3 process.
Statements of Agreement and/or Dispute:
10 responses were received on the Transportation (Including Sustainable
Transport) section of our Infrastructure Topic Paper.  6 responses neither
agreed nor disagreed with the list of evidence evaluated or summary of
implications for the Proposed Plan provided.  3 agreed, and 1 disagreed
but did not wish for their comments to be registered as a formal dispute to
the Evidence Report.  
A breakdown of those responses grouped under stakeholder categories is
provided below, and a full summary of these comments, their status, and
the Council’s response in the relevant table under the Infrastructure –
Transportation (Including Sustainable Transport) issue in Appendix D.
 Key Stakeholders: 
o Nature Scot, agreed.
o Tactran, neither agreed nor disagreed, but made points of
clarification regarding the Council’s functions as they relate
to transport to be consistent with the Regional Transport
Strategy to ensure LDP3 fully understands the transport and
accessibility impacts of its proposals.
o Perth and Kinross Council Transportation and Development
Team, agreed.
o Transport Scotland, provided statement of agreement in
February 2025.
 Community Councils: 1 response from Kenmore and District
Community Council who neither agreed nor disagreed with the list
of evidence and summary of implications.
 Public at Large: 2 anonymous responses were received, which
neither agreed nor disagreed with the evidence reviewed and
summary of implications provided.  
 Landowners and Agents: 3 responses were received, 1 agreed, and
the other 2 neither agreed nor disagreed. 
 Other Bodies: Homes for Scotland disagreed with the list of
evidence evaluated and made some suggestions for additional
sources of evidence to include.  They did not wish for their
response to be registered as a formal dispute to the Evidence
Report.

Page 246

246
Views on the Infrastructure of the Area
Under Part 2, Section 16B(3) and Section 15(5)(d)- (e) of the Planning Act
2019, in the preparation of their Evidence Report, planning authorities are
required to provide their views on the infrastructure of the plan area, and
how that infrastructure is used.
With respect to the Perth and Kinross Area, there are varying degrees of
provision for specific travel modes.
Road Travel
The road network accounts for a total of 2,785 Km, including 270 Km of
trunk roads.  Most main settlements within Perth and Kinross are served
by the trunk road network.  The A9 connects Perth to Glasgow to the
Southwest, passing through Auchterarder, and Inverness to the North,
skirting a series of small settlements such as Luncarty, Bankfoot, Dunkeld
and Pitlochry.  The A85 is the main link between Perth and Crieff to the
West and serves other settlements including Methven and Comrie. 
The M90 travels North to South between Perth and Edinburgh, and it
serves the town of Kinross as well as the settlements of Bridge of Earn,
Glenfarg and Milnathort.  The A90 connects Perth to the Carse of Gowrie
and Dundee to the East, passing near the settlements of St. Madoes,
Inchture and Invergowrie. 
Some areas within Perth and Kinross are served by routes of strategic
importance that are not part of the trunk road network.  This is the case of
the A93 and A94, connecting Perth to settlements to the North-East
including Blairgowrie and Rattray, Scone, Coupar Angus and Alyth.  Further
West, the A827 connects the A9 with Aberfeldy and other settlements
near Loch Tay.
The condition of the road network is broadly consistent with the figures
seen for Scotland, however the percentage of A roads requiring repairs in
Perth and Kinross (7%) is significantly higher than the national average
(4%).  The Council is responsible for the maintenance of local roads, while
Transport Scotland, via maintenance partners, oversee the condition of the
trunk road network.
An analysis of permanent traffic counts shows most road sections
experiencing variations (increase or decrease) of under 10% in daily flow
between 2018 and 2023.  Within the trunk road network, these larger
variations were registered along the A9 north of Perth City.
With regards to journey times and reliability, data from the Scottish
Household Survey (SHS) suggests that road users in Perth and Kinross
experience fewer delays in their journeys when compared to the average
for Scotland.  This is likely related to the predominance of rural areas
within the Council Area.
Road safety figures show a slight increase in the number of incidents,
following a sustained decrease since the late 1970s.  The number of
casualties also presents moderate growth since 2020 but remains below
the figures seen in the early 2010s.

Page 247

247
Active Travel
The local network of active travel infrastructure includes 2,042 Km of core
paths and over 200 Km of National Cycle Network routes. 
There are several improvements projects that include the expansion,
optimisation and maintenance of the network.  These enhancements
target both rural and urban areas, with examples such as Green Routes
looking to improve the network in rural roads, and School Exclusion Zones
improving the active travel environment for students accessing
educational premises.
The Council is also involved in the delivery of behavioural change
campaigns, encouraging the uptake of active travel for the public at large
and for specific groups such as school pupils and the elderly.
In addition to Perth and Kinross Council’s efforts, the Regional Transport
Partnership is working on improvements to the infrastructure for walking
and cycling in the area.  The Regional Active Travel Network proposes
enhancements to a set of routes across different local authorities, with 21
of the 39 being located within Perth and Kinross.
Public Transport
The public transport network in Perth and Kinross includes robust
geographic coverage for buses, with a more disperse presence of rail
networks. 
The majority of settlements have some form of public transport available. 
However, it is unclear whether local communities enjoy easy access to
these services, with conveniently located stops, and whether the
frequency of bus routes is sufficient to offer a suitable alternative to the
private car.  At the time of writing this chapter, the Public Transport Team
is collating route and passenger data and is expected to provide a more
accurate understanding of the quality of the provision.
In addition to local and intercity bus services, there are several Community
Transport initiatives.  These operate independently and, while the Council
helps in their delivery, their viability depends on patronage levels and the
availability of funding from external sources. 
The Council also supports a Demand Responsive Transport service
between Kinloch Rannoch and Pitlochry, which has recently been
expanded to serve Aberfeldy.
Perth and Kinross Council is part of the Tayside Bus Alliance.  This group is
currently working on a programme of improvements to route design,
frequency, infrastructure and marketing to increase the quality of service
and encourage modal shift.  4 routes within Perth have been included in
the preliminary assessment and will now be considered for the Strategic
Business Case stage.
Rail services are available through a total of 7 stations across the Council
Area.  These are located on two main routes, one connecting Perth to
Stirling, Glasgow and Aberdeen and the second one travelling north to
Inverness and south towards Fife and Edinburgh.  Of the larger
settlements, only Perth, Auchterarder and Pitlochry have railway station.
This restricts the role of the rail as an alternative to the private car.

Page 248

248
Data from the Scottish Household Survey highlights low levels of public
transport usage in Perth and Kinross.  Regular users (a minimum of 2 times
per week) of buses (7%) and train (1%) are significantly below national
figures for Scotland (c. 15% and 4% respectively).
The access domain within the Scottish Index of Multiple Deprivation
(SIMD) also highlights connectivity issues between households and
facilities and services of regular use.  A comparison between average
journey times for cars and public transport shows significant differences. 
For Perth and Kinross as a whole, these regular trips take 2.46 times longer
when using public transport.  While some of these gaps can be understood
because of the distance to services in rural areas, some data zones within
larger settlements also show significant discrepancies.  An example of this
is Burghmuir and Oakbank, within Perth City, which experiences journey
times 3.3 longer when using public transport.  This is the worst value for
the whole of Perth and Kinross, despite being in a relatively dense area.
Travel Behaviour
The combination of infrastructure and geographies influence trends in
travel behaviour for Perth and Kinross. The SHS shows high levels of car
usage, around 9 percentage points higher than the national average. 
Travel to work metrics also suggest low levels of usage for public transport
options, with buses and rail being the preferred option for 1 and 2 percent
of commuters, respectively (compared to 9 and 4% for Scotland). 
However, walking appears to be a more popular mode of travel to work,
preferred by 18% of commuters in the region compared to 13% for the
whole of Scotland.
There are also interesting findings for pupils travelling to school.  The
Hands Up Scotland Survey shows walking is consistently amongst the most
popular modes of travel to school for primary and secondary pupils.  The
more granular data confirms this is the case for both age groups. 
However, there are significant differences in travel choices for pupils of
each school type.  For example, primary school pupils are much more likely
to be driven to school (24.2% on average for the 2008-2023 period)
compared to pupils attending secondary schools (11.8%).  In line with this
evolution in travel patterns by age group, the use of Park and Stride
facilities is significantly more common in primary school pupils (10.8%)
than in secondary schools (2.9%). 
The most significant change in travel choices for pupils relates to the use of
buses.  This is a relatively unlikely option for primary school pupils (7.7% on
average between 2008 and 2023) but becomes the most popular travel
mode for pupils travelling to secondary schools (44.4%).  Conversely,
cycling goes from being the mode of choice for 5.8% of primary school
pupils to being preferred by only 1.2% of pupils attending secondary
schools.

Page 249

249
Issue 023: Infrastructure – Wastewater Treatment and Water Supply
Links to Evidence:
Scottish Water, The Development Plan Process: A Guide to Considering
Water and Waste Water Services (Core Doc Ref: D023_CD001)
SEPA, Policy and Supporting Guidance on Provision of Waste Water
Drainage in Settlements (2006) (Core Doc Ref: D023_CD002)
Scottish Water Waste Water and Water Supply Strategic Asset Capacities 
Scottish Water Current Investment Programmes (Core Doc Ref: D023_CD004)
Scottish Water Drainage and Water Supply Network Spatial Data (will be
requested to inform the Proposed Plan, and SEA site assessment)
Scottish Water, Climate Change Adaptation Plan (Core Doc Ref: D023_CD005)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue 023, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix D to this Evidence Report.  Chapter 6 also provides
an overview of the main issues of relevance to the development of LDP3.
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue and
engagement with stakeholders, it was noted that Scottish Water reiterated
their commitment to not restrict development, and the Council will
continue to engage with them during the preparation of our Proposed
Plan, to inform them of likely areas of development.  With due
communication and agreement on delivery timeline and phasing, future
residential developments can be presumed to receive access to public
water and Waste Water services.  For industrial uses, we will engage with
Scottish Water directly to identify potential stress points in the available
capacity, and the need to deliver suitable infrastructure.
Statements of Agreement and/or Dispute:
1 response was received from Scottish Water on our Infrastructure Waste
Water Treatment and Water Supply Topic Paper.  They did not disagree
with the overall content and evidence reviewed within the Topic Paper,
but requested some alternative wording relating to water and waste
water, and highlighted that they can provide additional spatial data for use
in the assessment of site proposals for inclusion in the Proposed Plan.  
Scottish Water does not wish to raise a formal dispute. 
A full summary of Scottish Water’s comments, their status, and the
Council’s response is provided in the relevant table under the
Infrastructure – Waste Water Treatment and Water Supply issue 023 in
Appendix D.

Page 250

250
Views on the Infrastructure of the Area
Under Part 2, Section 16B(3) and Section 15(5)(d)-(e) of the Planning Act
2019, in the preparation of their Evidence Report, planning authorities are
required to provide their views on the infrastructure of the plan area, and
how that infrastructure is used.
With respect to the Perth and Kinross Area, the provision of water supply
and waste water services needs to be understood within a wider context. 
The network managed by Scottish Water relies on a series of water and
waste water treatment works that draw service areas beyond the territory
of the Council.  Consequently, water services should be considered a cross-
boundary matter that requires continuous coordination with Scottish
Water, SEPA and neighbouring local authorities.  This is particularly
relevant in the case of water supply, with treatment works often covering
large areas across different local authorities.
With regards to the level of capacity available in Perth and Kinross, the
local network is served by a total of 13 water treatment works.  Following
Scottish Water calculations, nine of these locations are considered to offer
sufficient capacity for the projected levels of development, with the
following four outlined for potential future investment:
 Kirkmichael
 Killicrankie
 Lintrathen
 Lomond Hills
68 of the 85 waste water treatment works serving the territory of Perth
and Kinross are considered for future investment.  The growth project for
Perth City have already started, and the improvements to Burrelton works
are approaching sign off at the time of writing.  3 further growth projects
are planned for Blairgowrie, Stanley and Meigle, with delivery estimated
for 2026, 2027 and 2029, respectively.
A table summarising the status of capacity for water and waste water
works, and maps showing service areas associated with them, are shown in
the Perth and Kinross Water and Waste Water Infrastructure document.

Page 251

251
PRODUCTIVE PLACES

Page 252

252
PRODUCTIVE PLACES
5.6.1 The issues covered under the NPF4 theme Productive Places are:
 024: Community Wealth Building
 025: Business and Industry
 026: Retail, City, Town, and Commercial Centres
 027: Rural Development
 028: Tourism
 029: Culture and Creativity
 030: Minerals
5.6.2 A full summary of the review of evidence undertaken for all issues
under this theme, including all relevant links to that evidence, and a
summary of stakeholder engagement, has been provided under
Appendix E to this Report.  Chapter 6 also provides an overview of
the main issues of relevance to the development of LDP3.
5.6.3 To save duplication in the re-reporting of that information, the
pages to follow concentrate instead on providing an overview of
the identified gaps, uncertainties or key issues in the evidence
gathered, and a summary of agreement, and/or disputes related to
the evidence which were received through our programme of
participation and engagement reported under Chapter 3.
5.6.4 As previously outlined under paragraph 5.5.2, as NPF4 Policy 17
deals with both residential and non-residential development in
rural areas, only the ‘Homes’ element of that policy was reported
under the Homes issue (017), and the full summary for this entire
issue is provided under this theme for completeness.

Page 253

253
ISSUE 024: COMMUNITY WEALTH BUILDING
Links to Evidence:
Register of community asset transfers (Core Doc Ref E024_CD001)
Perth and Kinross Community Plan: Local Outcomes Improvement Plan
2022 to 2032 (Core Doc Ref E024_CD002)
Eastern Perthshire Local Action Plan (Core Doc Ref E024_CD003)
Highland and Strathtay Local Action Plan (Core Doc Ref E024_CD004)
Kinross-shire, Almond and Earn Local Action Plan (Core Doc Ref E024_CD005)
Strathearn and Strathallan Local Action Plan (Core Doc Ref E024_CD006)
Perth City Local Action Plan (Core Doc Ref E024_CD007)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix E to this Evidence Report.  Chapter 6 also provides an
overview of the main issues of relevance to the development of LDP3.
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue, it was
identified that:
 The Proposed Plan will need to take account of any updates that
may be made to the Perth and Kinross Community Plan (Local
Outcomes Improvement Plan) and the Locality Action Plans.  These
will need to be embedded into the Proposed Plan.
 It will also need to consider the contents of any registered Local
Place Plans, and whether they have implications for community
wealth building in the Plan Area because there is a link between
community asset transfer opportunities and Local Place Plans.
Statements of Agreement and/or Dispute:
5 responses were received on our Community Wealth Building Topic
Paper. Most respondents either agreed with or had no comment to make
on the evidence identified through the topic paper, and the summary of
the implications of that evidence for the Proposed Plan provided by the
Council. 
 Key Stakeholders:
o Historic Environment Scotland provided neutral comments on
the Community Wealth Building Topic Paper.
 Community Councils: Earn Community Council recommended that the
outcomes of the Big Place Conversation should inform the Proposed
Plan’s consideration of community wealth building; and that the Local
Action Plans require updating.
 Landowners and/or Agents: 2 planning consultants (Gray Planning &
Development, and Savills) made constructive comments on issues for
the Proposed Plan to consider.
 Other Bodies:
o Homes for Scotland stated their disagreement with the
implications for the Proposed Plan, but did not wish to register
their comments as a formal dispute.

Page 254

254
ISSUE 025: BUSINESS AND INDUSTRY
Links to Evidence:
National Economic Strategies/Analysis
Levelling Up the United Kingdom (Core Doc Ref E025_CD001)
Scotland's National Strategy for Economic Transformation (Core Doc Ref
E025_CD002)
Scottish Index of Multiple Deprivation (Core Doc Ref E054_CD003)
Scottish Vacant and Derelict Land Survey 2023 (Core Doc Ref E025_CD004)
Town and Country Planning (Masterplan Consent Areas) (Scotland)
Regulations 2024 which come into force on 5 December 2024 (Core Doc Ref
E025_CD005)
Regional Economic Strategies
Tay Cities Region Economic Strategy 2019-2039 (Core Doc Ref E025_CD006)
Tay Cities Region Deal (Core Doc Ref E025_CD007)
Local Economic/Place Strategies
Perth and Kinross Economic Wellbeing Plan 2020-2028 (Core Doc Ref
E025_CD008)
Draft City Centre Design and Development Framework (2024) (Core Doc Ref
E025_CD009)
Perth City Plan 3: Perth 2040 our agenda for change (Core Doc Ref
E025_CD010)
Local Analysis
Employment Land Audit 2022 (The 2025 audit will not be available for the
Evidence Report stage) (Core Doc Ref E025_CD011)
Local Living and 20 Minute Neighbourhood Analysis and Locality Profile
work (will be prepared prior to preparation of Proposed Plan)
An Urban Capacity and Brownfield Study (will be completed prior to
preparation of Proposed Plan)
Perth and Kinross Council Employment Land Matrices (Core Doc Ref
E025_CD012)
LDP2 categorisation of two types of employment land, core and general
(review may be completed prior to preparation of Proposed Plan, if these
two categories are continued in LDP3 policy)
Perth and Kinross Economic Strategy and Action Plan (2025-2030) (Core
Doc Ref E025_CD0013)
Invest in Perth and Kinross Prospectus (Core Doc Ref E025_CD0014)
Perth City Centre Development and Design Framework (Core Doc Ref
E025_CD0015)
Perth and Kinross Council Employment Land and Property Market Analysis
December 2022 (Core Doc Ref CD024)
Perth and Kinross Council, LDP3 Big Place Conversation Summary Report
(Core Doc Ref CD016)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue 025, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix E to this Evidence Report.  Chapter 6 also provides an
overview of the main issues of relevance to the development of LDP3. 
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue, it was
identified that:

Page 255

255
 Quantitative Analysis of Business and Industrial Land Strategy -
Summary of the potential Proposed Plan employment land
requirement:
o 48 Hectares for the anticipated take up over 2025-2037 period
o Add 30 Hectares for unanticipated larger industrial user/s 
o Add between 25-30% for flexibility 
This suggests a potential minimum total of 100 Hectares of
effective employment land) may be an appropriate employment
land requirement for LDP3.  However, should the 2024 Employment
Land Audit when it is completed to inform the Proposed Plan
indicate a significant change in the average take up of employment
land, this amount should be reevaluated accordingly.
 Qualitative Analysis of Business and Industrial Land Strategy
(Viability/Deliverability) - To help address identified viability and
deliverability issues, LDP3 will need to consider further
opportunities for mixed uses allocations where appropriate and
ensure there is appropriate cross funding between housing and
employment uses.  This approach would also support the 20 minute
neighbourhood, local living policy.  Also to ensure cross funded
serviced sites are “oven ready” consideration should be given to
defining serviced employment land in the LDP3 so that there is a
consistency in the quality of the cross funded employment land
delivered.
In terms of qualitative assessment, when completed, the Scottish
Vacant and Derelict Land Survey (SVDLS), and the Urban Capacity
and Brownfield Study will provide an effective review of capacity
and potential of development sites and vacant properties.  The key
strategy is to retain employment land in the good locations and
consider reallocating to other/mixed uses where existing business
sites are underused or unsuitable.  After the identification of
potential LDP allocations, or alternative uses for existing
allocations, there will be SEA Site Assessment of all sites. In terms
of delivering Perth and Kinross’ market potential - including the
industrial property projections suggested in the Perth and Kinross
Council Employment Land and Property Market Analysis December
2022 - and creating capacity for mobile and unanticipated projects
will require more of the land supply to move beyond allocation into
servicing and marketing.  The Proposed Plan will consider any
potential new employment land sites, whether any existing ones
should be deallocated, and where mixed-use allocations could
improve deliverability and viability of employment land and/or
address local living objectives
 Qualitative Analysis of Business and Industrial Land Strategy
(Inclusive Economic Growth) - In a Perth and Kinross context, there
are significant limitations to using the Scottish Index of Multiple
Deprivation (SIMD) data to inform our employment land strategy as
rural deprivation is dispersed, and the rural population accounts for
nearly half of the Perth and Kinross population.

Page 256

256
In terms of generating economic prosperity for all people and
places, and reducing poverty, the SIMD highlights the importance
of the Proposed Plan identifying sufficient employment land within
Perth, and Blairgowrie and Rattray.  However, their position within
the settlement hierarchy, and the market demand within them,
supports this approach too.  It is considered that the Proposed Plan
strategy should where possible provide employment land provision
within the following settlements (which are tiered settlement
locations from the LDP2):
o Perth Core Area.
o The 3 Regional Centres (Crieff, Kinross/Milnathort, and
Blairgowrie/Rattray).
o And the Local Centres (Pitlochry, Dunkeld and Birnam,
Aberfeldy, Auchterarder, Alyth, and Coupar Angus).
o Also, further locations to meet market demands, and other
policy objectives, such as reuse of brownfield land, and 20
minute neighbourhood/local living aims and objectives
should be considered. 
To identify where future business and industry may provide the
most benefit there is a current gap in evidence in terms of the
Locality Profile work which when completed will help inform work
on Local Living and 20 Minute Neighbourhoods required under
NPF4 Policy 15.  The template has yet to be developed but will be in
place prior to work beginning on the Proposed Plan and will
consider the range of employment opportunities, and availability of
LDP employment land. These Locality Profiles will be informed by
results of our LDP3 Big Place Conversation exercise (using the Place
Standard Tool) which are being collated to produce summaries for
each of the localities.  The Big Place Conversation summaries will be
considered through our future Locality Profile work.
Perth and Kinross Council Employment land matrices utilise a
‘balanced scorecard’ approach to determine the sites most likely to
require Council intervention and their relative attributes.  When
updating these assessments, there was not always enough
consideration of active travel links, an area of increased emphasis in
national policy.  Also, since they were prepared, there is an
increased emphasis on generating economic prosperity for all
people and places. 
Future updates of these matrices should consider those aspects
carefully.  Informing these matrices, analysis of the spatial
distribution of existing serviced employment land, the Council’s
employment property records, together with consideration of the
20 minute neighbourhood and Locality Profile analysis will help
identify priorities. 
Tactran notes that it is difficult to understand the scale of the
problem and the potential impact new development can have on
business and industry without knowing the baseline data in relation
to, for example, traffic levels (including congestion and journey
times), wider connectivity and origins and destinations of the
relevant travel to work areas as well as average travel to work

Page 257

257
times.  As such, Tactran suggest any audit should consider those
parameters.  The Council will be carrying out a Transport Appraisal
after the Evidence Report stage to inform the Proposed Plan, this
will consider the cumulative impact of potential new development.
Whilst it is unclear how the methodology once agreed with
Transport Scotland will consider potential impacts on existing
business and industry it will at a broad level consider how
development could affect the communities involved.
This work considering LDP employment land allocations and their
relative priority for public sector intervention will inform the LDP
review, help with delivery of LDP sites, and will inform the Council’s
Investment Property Strategy, its Commercial land and property
portfolio, and Commercial Property Investment Programme.  It will
also assist in maintaining the Perth and Kinross Council Corporate
plan performance indicator for the area of immediately available
serviced business land to an appropriate level. Updating
Employment land matrices will help prioritise public sector
intervention and hopefully help deliver constrained sites.
Statements of Agreement and/or Dispute:
9 responses were received on our Business and Industry Topic Paper.  6
respondents either agreed with or had no comment to make on the
evidence identified through Topic Paper 026, or the summary of the
implications of that evidence for the Proposed Plan provided by the
Council.  A number offered examples of additional sources of information
which they felt should be considered and/or highlighted other potential
implications for the Proposed Plan. 
There was 1 response on the issue which the respondent wished to be
treated as a formal dispute to the Evidence Report.  There were also 2
further responses where there was a disagreement, but they did not
register a formal dispute.  A breakdown of those responses grouped under
stakeholder categories is provided below, and a full summary of these
comments, their status, and the Council’s response in the relevant table
under the Business and Industry issue 025 in Appendix E.
 Key Stakeholders:
o Tactran, neither agreed nor disagreed
o Scottish Water, neither agreed nor disagreed
 Community Councils: 2 responses, 1 agreed and the other neither
agreed nor disagreed.
 Public at Large: No comments received.
 Landowners and Agents: 4 responses, 1 of which agreed, 1 neither
agreed nor disagreed, 1 disagreed but did not wish for their
comments to be recorded as a formal dispute (Stuart Buchanan on
behalf of Cardross Asset Management Ltd) and 1 (Savills on behalf
of Scone Estate) disputed the evidence and wish for their
comments to be registered as a formal dispute as they want to see
the Council's explicit recognition that investment in the Cross Tay
Link Road (CTLR) is intended to unlock significant additional
investment and the Evidence Report and LDP3 must reflect this by
freeing up development opportunities in conjunction with the
opening of the new road infrastructure.

Page 258

258
 Other Bodies: Homes for Scotland, disagreed but do not wish to
register as a formal dispute.

Page 259

259
ISSUE 026: RETAIL, CITY, TOWN AND COMMERCIAL CENTRES
Links to Evidence:
Place Audits, Assessments and Strategies
Understanding Scotland’s Places (Core Doc Ref E026_CD001)
Scottish Vacant and Derelict Land Survey 2023 (Core Doc Ref CD048)
Local Living and 20 Minute Neighbourhood Analysis and Locality Profile
work (which will be carried out to support the preparation of the Proposed
Plan)
An Urban Capacity and Brownfield Study (which will be carried out to
support the preparation of the Proposed Plan)
City Centre Design and Development Framework (draft currently being
used to engage stakeholders, expected to return to committee Spring 2025
for approval) (Core Doc Ref E026_CD002)
Perth City Centre Customer and Occupier Demand Study(Core Doc Ref
E026_CD003)
City Centre Design and Development Framework (published July 2025)
(Core Doc Ref E026_CD004)
Perth and Kinross City and Town Centre Retail Study (city, town centre, and
neighbourhood reviews) (Core Doc Ref: CD023)
Perth and Kinross Council, LDP3 Big Place Conversation Summary
Report(Core Doc Ref: CD015)
Retail and Leisure Sector Guidance and Capacity
Perth and Kinross City and Town Centre Retail study  (retail capacity
conclusions and policy consideration, and market context and trends) (Core
Doc Ref: CD023)
Scottish Government, Diet and Healthy Weight: Out of Home Action Plan
(Core Doc Ref E026_CD004)
Food Standards Scotland, The Out of Home Environment (Core Doc Ref
E026_CD005)
Permitted Development Rights  
The Town and Country Planning (General Permitted Development and Use
Classes) (Scotland) Miscellaneous Amendment Order 2023 (Core Doc Ref
E026_CD006)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix E to this Evidence Report.  Chapter 6 also provides an
overview of the main issues of relevance to the development of LDP3. 
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue, it was
identified that:
 Retail Development - Considering the retail forecasts of the Perth
and Kinross City and Town Centre Retail study, there is no
requirement to plan for major new retail development, but there
will be a need to consider neighbourhood scale retail.  Also, whilst
there is a need to move on from retail led centres, the Proposed
Plan should afford sufficient protection for footfall generating
activities and allow for proper scrutiny of change of use proposals
from town centre use(s) to ground floor residential.  This is

Page 260

260
something which should be considered further when preparing the
Proposed Plan. 
 Identification of Town, Neighbourhood, and Commercial, Centres
- There will be a need for LDP3 to identify the town centres,
neighbourhood centres, and commercial centres (the network of
centres reflecting the principles of 20 minute neighbourhood). 
There will also be a need to consider if Perth City Centre and the
town centre extents should be redefined, or whether a policy
approach will be sufficient. An analysis of all our centres (including
neighbourhood and commercial centre provision) alongside
consideration of suitable extents for them, will be provided within
Locality Profiles which are estimated to be completed by end of
2025.
 Opportunities for Town Centre Living - There is a need to consider
the opportunities for town centre living.  Carrying out a future
Urban Capacity and Brownfield Study will help identify the scale of
the opportunities and any issues which require a response in the
Proposed Plan.  It will help in identifying suitable conversion and
new build opportunities for residential development within the
centres.  This study will identify longer term red sites with some
constraints associated to them, which may or may not be
supported, and these should be considered through the LDP
review, and through SEA Site Assessment.
The settlement hierarchy in the existing LDP2 is largely appropriate,
however the Perth and Kinross City and Town Centre Retail study
2023 does provide some guidance on what will require review in
the Proposed Plan.  This concerns whether Coupar Angus should be
redefined as a neighbourhood centre and also requires defining
neighbourhood centres in a more comprehensive way.   The retail
study suggests some additional neighbourhood centres within
Perth, whilst future local living and 20 minute neighbourhood
analysis and Locality Profile work to support the Proposed Plan,
may identify the need to identify further neighbourhood centres.
An analysis of all our centres will be provided within Locality
Profiles which are estimated to be completed by end of 2025.
 Definition of Retail Scales - The Perth and Kinross City and Town
Centre Retail study provides recommended definitions to help with
the interpretation of NPF4 Policy 28 Retail policy reference to edge
of centre sites, to small scale neighbourhood retail, and to the
floorspace threshold at which an impact assessment will be
required.  These are matters which it is generally too early to
consider and will be considered at the Proposed Plan stage. 
However, since the Proposed Plan will need to consider
opportunities for neighbourhood scale retail, it might be useful to
be aware that the study suggests this should be defined as
comprising no more than 500 sqm gross in total, with individual
retail units measuring no more than 200 sqm gross.  These controls

Page 261

261
would ensure development principally serves local retail needs and
is consistent with the principles of 20 minute neighbourhoods. 
 Eating Out of Home – As this sector continues to grow, it is
important that this growth sector supports existing centres which
are losing some of their retail function.  In terms of future food and
drink development opportunities, these will be directed to existing
centres as per NPF4 Policy 27.  The evidence from the Perth and
Kinross City and Town Centre Retail study, the availability of
existing drive through provision, and the recent planning
permissions granted for drive through provision at Broxden in Perth
suggests that it is unlikely that the Proposed Plan will need to
allocate any new sites for drive-through restaurants.  This analysis
is informed by NPF4 Policy 27 City, Town, Local and Commercial
Centres, which identifies drive throughs are only appropriate where
they would not negatively impact on the principles of local living or
sustainable travel.  There is also scope to consider drive through
applications on retail allocations without necessarily requiring
specific allocations for drive throughs.
 Clustering of Non-Retail Uses - In terms of the NPF4 consideration
of potential clustering of hot food takeaways, high-interest money
lending, and betting shops, the Perth City Centre Area does have
multiple fast-food take-aways and some (but not high numbers)
betting shops.  This reflects the nature and function of a city centre
and is not problematic.  The food and beverage overview within the
Perth and Kinross City and Town Centre Retail study does not note
any problematic clustering of takeaway provision.  Therefore,
clustering of these non-retail uses is not an obvious issue within
Perth and Kinross.
Statements of Agreement and/or Dispute:
9 responses were received on our Retail, City, Town and Commercial
Centres Topic Paper.  Two thirds of the respondents either agreed with or
had no comment to make on the evidence identified through Topic Paper
027, or the summary of the implications of that evidence for the Proposed
Plan provided by the Council.  A number offered examples of additional
sources of information which they felt should be considered and/or
highlighted other potential implications for the Proposed Plan.
There were 3 responses on the issue which the respondents wished to be
treated as a formal dispute to the Evidence Report.  A breakdown of those
responses grouped under stakeholder categories is provided below, and a
full summary of these comments, their status, and the Council’s response
in the relevant table under the Retail, City, Town and Commercial Centres
issue 026 in Appendix E.
 Key Stakeholders:
o Nature Scot, neither agreed nor disagreed
o Historic Environment Scotland, agreed
o Scottish Water, neither agreed nor disagreed
 Community Councils: 2 responses were received, 1 agreed and the
other neither agreed nor disagreed.

Page 262

262
 Public at Large: 1 response received which neither agreed nor
disagreed.
 Landowners and Agents: 3 responses, all disputed the evidence
and wish for their comments to be registered as a formal dispute.  1
(Lichfields on behalf of McDonalds) dispute as the evidence in the
Topic Paper is not considered sufficient to accurately create new
policy working in the future LDP regarding drive-thru
developments, 1 (Montague Evans on behalf of Loch Developments
Ltd) seek the allocation of the former BCA for mixed uses, retail,
drive through and residential, and 1 (Avison Young on behalf of Aldi
Stores Ltd) dispute as it is considered that less capacity has been
identified than available and inaccurate conclusions have been
reached about deficiencies across Perth.  Aldi stores also disagree
with the implications for the Proposed Plan.
 Other Bodies: No comments received.

Page 263

263
ISSUE 027: RURAL DEVELOPMENT
Links to Evidence:
Scottish Government Urban Rural 6-fold Classification 2020 (Core Doc Ref
E027_CD001)
Perth and Kinross Housing Land Audit 2023 (Core Doc Ref E027_CD002)
NPF4 and Rural Planning – RTPI Scotland Thinkpiece (Core Doc Ref
E027_CD003)
Understanding Scottish Places (Core Doc Ref E027_CD004)
Scottish Agritourism Growth Tracker 2022 (Core Doc Ref E027_CD005)
Tay Cities Region Economic Strategy 2019-2039 (Core Doc Ref E027_CD006)
Perth and Kinross Economic Wellbeing Plan 2020-2028 (Core Doc Ref
E027_CD007)
NRS Small area population estimates for Scotland 2021 (Core Doc Ref
E027_CD008)
The James Hutton Institute: Population projections and an introduction to
economic-demographic foresight for Scotland’s sparsely populated areas
(2018-43) (Core Doc Ref E027_CD009)
Scottish Government Advisory Group: Place-based policy approaches to
population challenges – Lessons for Scotland (Core Doc Ref E027_CD010)
A Scotland for the future: opportunities and challenges of Scotland’s
changing population (Core Doc Ref E027_CD011)
Perth and Kinross Local Housing Strategy Framework 2022-27 and Action
Plan (Core Doc Ref E027_CD012)
Tay Forest National Park Evidence Report (Core Doc Ref E027_CD013)
Tayside and Central Scotland Regional Transport Strategy 2024-2034(Core
Doc Ref E027_CD014)
Perth and Kinross Mobility Strategy (Core Doc Ref E027_CD015)
Aberfeldy and surrounding area Community Housing Needs Survey July
2022 (Core Doc Ref E027_CD0016)
Comrie area Community Housing and Business Needs Survey Report Nov
2022 (Core Doc Ref E027_CD0017)
Highland Area Local Plan 2000 (Core Doc Ref E027_CD018)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix E to this Evidence Report.  Chapter 6 also provides an
overview of the main issues of relevance to the development of LDP3. 
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue, it was
identified that:
 Local Place Plans (LPPs) - Whilst the Council has received some
expressions of interest from community bodies, no LPPs have yet
been registered.  There is, therefore, a potential issue in aligning
the timescales for the preparation of LPPs and the Proposed Plan. 
Work is programmed to begin during early 2025 on preparing the
Proposed Plan.  Realistically, therefore, LPPs will need be registered
by Spring 2025 if they are to have the best opportunity to influence
the Plan. It is not known, however, how realistic this timescale will
be for community bodies.

Page 264

264
Statements of Agreement and/or Dispute:
12 responses were received on our Rural Development Topic Paper.  Just
over half of respondents either agreed with or had no comment to make
on the evidence identified through Topic Paper 028, and the summary of
the implications of that evidence for the Proposed Plan provided by the
Council.  A number offered examples of additional sources of information
which they felt should be considered and / or highlighted other potential
implications for the Proposed Plan.
There were 3 responses on the issue which the respondents wished to be
treated as a formal dispute to the Evidence Report and 2 comments where
the respondents indicated that they disagreed with the evidence but did
not wish for their response to be treated as a formal dispute.  
A breakdown of those responses grouped under stakeholder categories is
provided below, and a full summary of these comments, their status, and
the Council’s response in the relevant table under the Rural Development
issue in Appendix E.
 Key Stakeholders:
o NatureScot, did not state whether they neither agreed or
disagreed.
o Tactran, did not state whether they neither agreed or
disagreed.
o Scottish Water, neither agreed nor disagreed.
 Community Councils: 2 responses, 1 agreed and the other neither
agreed nor disagreed.
 Public at Large: 1 response, which neither agreed nor disagreed
 Landowners and Agents: 5 responses, 1 of which neither agreed
nor disagreed, 1 disagreed but did not wish for their comments to
be recorded as a formal dispute (Ristol Consulting), and 3 disputed
the evidence and wish for their comments to be registered as a
formal dispute. 1 (Savills on behalf of Scone Estate) on the grounds
that the assessment of Self and Custom Build demand/need should
use broader data sources and not just rely on historic planning
consents, 1 (also Savills on behalf of Scone Estate) on the grounds
that the Council must consider data sources regarding population
to support growth in rural settlements and housing clusters to
revitalise rural areas with supportive planning policies and
generous housing allocations, and 1 (Andrew McCafferty
Associates) on the grounds that more fine-grained analysis is
required and there is a need for a continued supply of new
allocations in rural areas.
 Other Bodies: Homes for Scotland, disagreed but do not wish to
register as a formal dispute.

Page 265

265
Allocation of Land for Resettlement Purposes
Part 2, Section 16B(3) and Section 15(5)(cc) of the Planning Act 2019
requires planning authorities, in the preparation of their Evidence Report,
to set out their views on the desirability of allocating land for the purposes
of resettlement.  
A significant proportion of Perth and Kinross is identified as Remote Rural
under the Scottish Government’s 6-fold Urban-Rural Classification.  There
are also several areas within Perth and Kinross where there has been a
significant decline in population.  This is particularly prominent in the most
remote areas of Highland Perthshire.  It will depend on the spatial strategy
chosen as to whether it will be appropriate to identify any areas as suitable
for resettlement in the proposed plan.

Page 266

266
ISSUE 028: TOURISM
Links to Evidence:
Visit Scotland’s Insight on Tourism in Perthshire (Core Doc Ref E028_CD001)
Perth and Kinross STEAM Tourism Economic Impacts Report and Summary
for 2012-2023 (Core Doc Ref E028_CD002)
Scotland Outlook 2030 Responsible Tourism for a Sustainable Future (Core
Doc Ref E028_CD003)
Historic Environment Scotland: Responsible Tourism Framework –
Transforming Heritage Tourism, 2023 (Core Doc Ref E028_CD004)
Scottish Agritourism – A Strategy for Sustainable Growth (Core Doc Ref
E028_CD005)
Tay Cities Region Deal (Core Doc Ref E028_CD006)
Tay Cities Region Tourism Framework 2025-2030 (Core Doc Ref E028_CD007)
Tay Cities Region Economic Strategy 2019-2039 (Core Doc Ref E028_CD008)
Perth and Kinross Economic Action Plan 2025-2030 (Core Doc Ref
E028_CD009)
Perthshire Tourism Strategy and Action Plan 2025-2030 (Core Doc Ref
E028_CD010)
Visit Scotland Visitor Management Plan (Core Doc Ref E028_CD011)
Visitor Management in Rural Areas Report to Environment and
Infrastructure Committee 28 Oct 2020 (Core Doc Ref E028_CD012)
Short-term Let Control Area: Proposals for Consultation Report to
Environment, Infrastructure and Economic Development Committee 31
May 2023 (Core Doc Ref E028_CD013)
Scottish Tourism Alliance Recovery of Scotland’s Tourism Sector Key
Findings (Core Doc Ref E028_CD014)
ASSC Survey: The Impact of Scottish Government Regulations on Business
(Core Doc Ref E028_CD015)
Tay Forest National Park Evidence Report and map of draft indicative
boundary (Core Doc Ref E028_CD016)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix A to this Evidence Report.  Chapter 6 also provides
an overview of the main issues of relevance to the development of LDP3. 
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue, it was
identified that:
 Age of Data - Lack of up-to-date data is an issue.  For example, The
Report on Visitor Management in Rural Areas dates from October
2020, although some of the findings were reiterated during the Big
Place Conversation consultation, for example, the impact of large
visitor numbers on popular destinations.  It will be important that
any decisions relating to visitor management considers more recent
levels of usage.
 Availability of Data at the Perth and Kinross Level - A significant
amount of data is available from the Scotland Visitor Survey 2023,
for example on attitudes towards responsible tourism,
accommodation used by visitors, planning and booking behaviours,
accessible and inclusive tourism, types of visitors, and how they
travel.  Also available is data on visitor interests and activities
including, culture and heritage tourism, cycling tourism, food and

Page 267

267
drink tourism, motorhomes etc tourism, outdoor activities tourism,
and wellness tourism.  At present, however, this data is only
available at a Scotland-wide level.
 Data on Active and Sustainable Transport - Tactran highlight that
there are problems in relation to active and sustainable transport
and the implications both for visitors and hospitality workers.  It
remains difficult, however, to understand the scale of the problem,
and the potential impact new development can have on tourism
and culture, without understanding for example the baseline data
in relation to traffic levels, wider connectivity and origins and
destinations of the relevant travel to work areas.  Data problems
are (i) origins / destinations / length of stay / purpose of visit, and
(ii) origins / destinations of workers.

Page 268

268
Statements of Agreement and/or Dispute:
10 responses were received on our Tourism Topic Paper, 1 of which came
from respondents who did not provide their name or contact details.  The
majority of respondents either agreed with or had no comment to make
on the evidence identified through Topic Paper 029, and the summary of
the implications of that evidence for the Proposed Plan provided by the
Council.  A number offered examples of additional sources of information
which they felt should be considered and / or highlighted other potential
implications for the Proposed Plan.
There was 1 response on the issue which the respondent wished to be
treated as a formal dispute to the Evidence Report. A breakdown of those
responses grouped under stakeholder categories is provided below, and a
full summary of these comments, their status, and the Council’s response
in the relevant table under the Tourism issue 028 in Appendix E.
 Key Stakeholders:
o Nature Scot did not state whether they neither agreed nor
disagreed.
o Historic Environment Scotland, agreed.
o Tactran, did not state whether they neither agreed nor
disagreed
o Scottish Water, agreed.
 Community Councils: 3 responses, 1 agreed and the other 2 neither
agreed nor disagreed.
 Public at Large: 1 response received from someone who did not
provide their name or contact details, they neither agreed nor
disagreed.
 Landowners and Agents: 2 responses, 1 of which neither agreed
nor disagreed, and the other (Savills on behalf of Scone Estate)
disputed the evidence and wish for their comments to be
registered as a formal dispute on the grounds that the significance
of the tourism sector to PKC must be understood and reflected in
planning policy.
 Other Bodies: No comments received.

Page 269

269
ISSUE 029: CULTURE AND CREATIVITY
Links to Evidence:
Perth and Kinross Council Corporate Plan 2022-2027 (Core Doc Ref: CD027)
The Scottish Government's Creative Industries Policy (Core Doc Ref
E029_CD001)
Growth Sector Briefing – Creative Industries, Office of the Chief Economic
Adviser, 14 March 2024 (Core Doc Ref E029_CD002)
The Scottish Government Growth Sector Statistics, 14 March 2024 (Core
Doc Ref E029_CD003)
Tay Cities Region Deal (Core Doc Ref E029_CD004)
Tay Cities Regional Economic Strategy 2019-2039 (Core Doc Ref E029_CD005)
Tay Cities Deal Heads of Terms Agreement (Core Doc Ref E029_CD006)
Tay Cities Region Tourism Strategy 2019-2024 (Core Doc Ref E029_CD007)
Visit Scotland Insight on Tourism in Perthshire 2023 (Core Doc Ref
E029_CD008)
Scotland Visitor Survey 2023 - Domestic and International  (Core Doc Ref
E029_CD09)
Perth and Kinross Council Culture Strategy 2023-2028 (Core Doc Ref
E029_CD010)
Perth and Kinross Council Gaelic Culture and Heritage Webpages (Core Doc
Ref E029_CD011)
Perth College University of Highlands and Islands (Core Doc Ref E029_CD012)
Gaelic Society of Perth (Core Doc Ref E029_CD013)
Learn Gaelic in Perth and Kinross Webpage (Core Doc Ref E029_CD014)
Scotland’s Creative Learning Plan, Creative Scotland (Core Doc Ref
E029_CD015)
Perth and Kinross LDP2 Infrastructure Capacity Studies (Core Doc Ref
E029_CD016)
Historic Environment Scotland – Local Development Plan Evidence – Perth
and Kinross Council (Core Doc Ref E029_CD017)
Historic Environment Scotland: Responsible Tourism Framework –
Transforming Heritage Tourism, 2023 (Core Doc Ref E029_CD018)
Your Community PK Website (Core Doc Ref E029_CD019)
Perth City and Towns Website (Core Doc Ref E029_CD020)
Perth and Kinross Council Events in Perth and Kinross Webpage (Core Doc
Ref E029_CD021)
Perth and Kinross LDP2 Design Charettes (Core Doc Ref E029_CD022)
Aberfeldy Square Regeneration Proposal (Core Doc Ref E029_CD023)
Perth and Kinross Council LDP3 Big Place Conversation (Core Doc Ref
E029_CD024)
Perth and Kinross Council Tay Forest National Park Bid (Core Doc Ref
E029_CD025)
Perth and Kinross Council Tay Forest National Park Bid - Consultation
Analysis report (Core Doc Ref E029_CD26)
Perth and Kinross Council, LDP3 Evidence Report Topic Papers (Core Doc Ref
E029_CD027)
Community Action Plans - Meigle and Ardler (Core Doc Ref: CD037), Stanley
(Core Doc Ref: CD038), Alyth (Core Doc Ref: CD039), Coupar Angus (Core Doc
Ref: CD040) , Dunkeld and Birnam (Core Doc Ref: CD041), Crieff (Core Doc Ref:
CD042) , Blairgowrie and Rattray (Core Doc Ref: CD43), Pitlochry and Moulin
(Core Doc Ref: CD044) , Muthill and Tullibardine (Core Doc Ref: CD045),
Auchterarder and Aberuthven (Core Doc Ref: CD046), and St. Fillans (Core
Doc Ref: CD047).

Page 270

270
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix E to this Evidence Report.  Chapter 6 also provides an
overview of the main issues of relevance to the development of LDP3.
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue 029, it was
identified that:
 Growth Sector Briefing – Creative Industries, Office of the Chief
Economic Adviser, 14 March 2024 and The Scottish Government
Growth Sector Statistics, 14 March 2024 - The Scottish Government’s
March 2024 Growth Sector Local Authority Area Statistics for the Perth
and Kinross Council Area reports data from 2021, 2022 and 2023 for
turnover, employment numbers and registered businesses figures,
respectively.  More recent data is not yet available, but any updates
available at the time of developing our Proposed Plan will be used to
inform the Plan.
 Perth and Kinross LDP2 Infrastructure Capacity Studies, LDP2 Design
Charettes, Aberfeldy Square Regeneration Proposal, and Community
Action Plans (CAPs) - Despite some time having elapsed since our
Design Charette reports were produced, their content still provides a
good source of information on the community’s views of their local
assets, their aspirations, areas for improvement, and a vision for the
future of their place.   Any data or statistics contained within them
which has since been updated will be reviewed as part of the LDP3
Locality Profile work.  The Audit will also consider if progress has been
made against the key issues and actions identified in the charettes, and
how those issues and actions compare to the feedback gathered
through the Big Place Conversation.
 Your Community PK Website - There is a note on the website’s
homepage to highlight that the site is currently undergoing
development.  It is difficult to know how up to date the information
contained on the site is regarding local groups and services.
 Number and Range of Venues and Facilities - It is planned as part of
the Locality Profile work for LDP3 to develop a Localities Profile
template which will set out those factors which Officers need to take
account of in developing their understanding of each place and its
needs to satisfy the requirements of the Planning Act, Regulations, LDP
Guidance and NPF4 policies.  This should allow for an up-to-date GIS
based audit of existing cultural offering in a place and highlight where
there is a known demand for additional or improved opportunities and
facilities.   The template has yet to be developed but will be in place
prior to work beginning on the Proposed Plan.

Page 271

271
Statements of Agreement and/or Dispute:
8 responses were received on our Culture and Creativity Topic Paper, 2 of
which came from respondents who did not provide their name or contact
details.  Most respondents (6 out of 8) either agreed with or had no
comment to make on the evidence identified through Topic Paper 030, and
the summary of the implications of that evidence for the Proposed Plan
provided by the Council.  A number offered examples of additional sources
of information which they felt should be considered.   
There were 2 responses on the issue which the respondents wished to be
treated as a formal dispute to the Evidence Report.  A breakdown of those
responses grouped under stakeholder categories is provided below, and a
full summary of these comments, their status, and the Council’s response
in the relevant table under the Culture and Creativity issue 029 in Appendix
E.
 Key Stakeholders:
o Historic Environment Scotland, agreed.
o Scottish Water, neither agreed nor disagreed.
 Community Councils: 1 response, disagreed (with the evidence
and datasets identified) but did not wish for their comments to be
recorded as a formal dispute (Errol Community Council).
 Public at Large: 1 response (private individual), disputed the
evidence and wish for their comments to be registered as a formal
dispute due to the implications of the misrepresented
employment data.
 Landowners and Agents: 2 responses, 1 neither agreed nor
disagreed, and the other (Savills on behalf of Scone Estates)
disputed the evidence and wish for their comments to be
registered as a formal dispute on the grounds that there is a lack
of data included in Topic Paper 030: Culture and Creativity on the
contribution of estates and significant historic and cultural
locations to the cultural life of Perth and Kinross.
 Other Bodies: No comments were received.

Page 272

272
Number and Range of Venues and Facilities:
Part 2, Section 16(B)(3) and Section 15(5)(ch) of the Planning Act (2019)
requires that, as part of the preparation of their Evidence Report, that
planning authorities set out their views on the desirability of maintaining
an appropriate number and range of cultural venues and facilities
(including in particular, but not limited to, live music venues).  
Within the Perth and Kinross Area there are examples where support has
been shown to support cultural venues and facilities, most notable the
Perth and Kinross Culture Strategy 2023-2028, which includes support for
maintaining venues, supporting festivals and local culture across the Area. 
There are a number of venues across Perth and Kinross with some having
international status, including Perth Theatre and Concert Hall, Perth
Museum and Pitlochry Festival Theatre.  The Perth Museum is an example
of direct support from the Council, opening in 2024 and housing the Stone
of Destiny and supporting revitalisation of Perth City Centre.  There is also
support for those wanting to enter the cultural environment, with Perth
College (part of the University of the Highlands and Islands (UHI)) having
650 culture and creative industry students.  Considering the specific
requirement in the Act the Proposed Plan will need to consider what can
be put in place to support the Council’s desire to support culture and
creativity.

Page 273

273
ISSUE 030: MINERALS
Links to Evidence:
Results of 2019 Aggregate Minerals Survey for Scotland (September 2023)
A preliminary geological assessment of Craiglea Quarry, Logiealmond,
Perthshire (2022): Decarbonisation & Resource Management Programme
Open Report OR/22/042 – (Core doc Ref: CD049)
https://nora.nerc.ac.uk/id/eprint/535694/1/OR22042_BGS_report_Craigle
a_Quarry_Slate.pdf (Core doc Ref: E030_CD001)
Summary of Evidence and Implications for the Proposed Plan:
A full summary of the evidence considered under this issue, including a
summary of implications of that evidence for the Proposed Plan has been
provided in Appendix E to this Evidence Report.  Chapter 6 also provides an
overview of the main issues of relevance to the development of LDP3. 
Any Gaps, Uncertainties or Key Issues Raised through the Evidence:
In reviewing the sources of evidence listed under this issue, it was
identified that:
 NPF4 sets out a requirement that the Local Development Plan
should always support a landbank of construction aggregates of at
least 10-years in the relevant market areas.
 A methodology for calculating the 10-year landbank might be
produced to improve consistency across Local Development Plans
in Scotland.
 The Proposed Plan will not be able to precisely calculate whether a
10-year landbank exists without improved data on demand and
product flows.  It is proposed to close this evidence gap by carrying
out more engagement with the minerals industry, including
industry bodies and active operators.  A local aggregates survey is
likely to be necessary.
 It is likely that a local aggregates survey undertaken with local site
owners and operators will be necessary.  While good data exists in
respect of permitted reserves and previous rates of extraction,
there are likely to be data gaps around predicting future demand
for minerals, and understanding planned future operations at
minerals sites, including any sites that are currently dormant.
 Aggregate Minerals Survey for Scotland 2020-23 - Data in respect of
this survey was returned in 2024, and is expected to be published
shortly, the outcome will be considered as part of the preparation
of the Proposed Plan.  This data will be useful in providing a more
up-to-date picture of activities.  Caution will be used in drawing
trends from this data however, because for the calendar years 2020
and 2021 quarries and their customers were operating under
varying degrees of COVID-19 pandemic restrictions.
 Analysis of the 2019 Aggregate mineral survey suggests that in the
Tay Area, there are sufficient permitted reserves for crushed rock
but that there may not be sufficient reserves of sand and gravel to
meet the demand for a 10-year landbank, as required by NPF4.

Page 274

274
Statements of Agreement and/or Dispute:
3 responses were received on our Minerals Topic Paper, 1 of which came
from a respondent who did not provide their name or contact details.  All
respondents agreed with the evidence identified through Topic Paper 031,
and none had comments on the summary of the implications of that
evidence for the Proposed Plan provided by the Council. 
There were no responses on the issue which the respondent wished to be
treated as a formal dispute to the Evidence Report.  A breakdown of those
responses grouped under stakeholder categories is provided below, and a
full summary of these comments, their status, and the Council’s response
in the relevant table under the Minerals issue 030 in Appendix E.
 Key Stakeholders:
o Historic Environment Scotland, agreed.
 Community Councils: 1 response, agreed
 Public at Large: 1 anonymous response which agreed.

Page 275

275
6 Summary of Key Issues for the LDP3 Spatial
Strategy
SUMMARY OF MAIN ISSUES BY THEME AND KEY POLICY CONNECTIONS
6.1.1 The pages to follow outline the key issues identified through the
review of the evidence for this Evidence Report with implications
for the development of our Proposed Local Development Plan 3.  
6.1.2 Where relevant, any key policy connections with other NPF4
policies have been highlighted and briefly reflected upon.  This is
important because the individual policies within NPF4’s National
Planning Policy suite should be read as a whole and applied
accordingly, and it is crucial to understand the interconnected
nature of the policies, and where policy synergies and conflicts
may arise in the development of our LDP3 Spatial Strategy.

Page 276

276
Sustainable Places
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
Issue 001: Climate and
Nature Crises
 LDP3 must address the global climate emergency and nature crisis
through its Spatial Strategy. 
 The Spatial Strategy developed for LDP3, should be an integrated one,
bringing together cross-cutting priorities to achieve sustainable
development, rather than compromising between environmental,
social, and economic objectives.  The Strategic Environmental
Assessment (SEA) for LDP3 will help the Plan strike a balance between
these different objectives, identifying and directing the right
development to the most appropriate and sustainable locations. 
 When preparing our LDP3 Spatial Strategy we will seek to achieve
sustainable development which can help to safeguard those in the
Perth and Kinross Area who are most vulnerable to the effects of
climate change, by avoiding outcomes which would unintentionally
increase their vulnerability.
 It is suggested that greenhouse gas emissions lifecycle assessments
are undertaken when preparing the Proposed Plan.  However, this is a
new field of expertise which local authorities will need to develop a
greater understanding of.
 It is also important that we take an ecosystem’s services approach to
developing LDP3’s Spatial Strategy.  This can best be achieved
through the SEA for LDP3. 
 NPF4 policies 1 and 2 will be implemented
through the collective impact of all the
other national planning policies.
 LDP3 Strategic Environmental Assessment
(SEA)
Issues 002: Biodiversity
and Natural Places
 Locality Profiles, our Big Place Conversation results and further
discussions with stakeholders and communities will help shape how
and where development will take place with a view to protecting
existing important landscapes.  This will extend to consideration of
the need for a local policy on landscape. 
 Requirement for a review of protected area condition, including
studies and stakeholder input to address site specific requirements
 Tackling the Climate and Nature Crises
(including Climate Mitigation and
Adaptation)
 Soils
 Forestry, Woodland and Trees, and the
review of our Forest and Woodland
Strategy
 Perth Green Belt Review

Page 277

277
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
and also to consider the continuation of, or addition of new, local
policies to protect and enhance the most vulnerable protected areas.
 Development of Draft Nature Networks has a potentially significant
role to play in how development is brought forward including the
location and site specific requirements to both protect and deliver
nature networks.
 Coastal Development
 Energy, Heating and Cooling
 Design, Quality and Place
 Blue and Green Infrastructure
 Play, Recreation and Sport
 Flood Risk and Water Management
 Rural Development
 Tourism
 LDP3 Locality Profiles and Site
Assessments
 LDP3 SEA and Habitats Regulations
Appraisal.
Issue 003: Soils The Proposed Plan…
 and selection/assessment of sites will be informed by existing data on
carbon rich soils, peatland, and priority peatland habitat (Class 1,2,3,5
soils).
 will assess any proposals in relation to the Carbon and Peatland Map,
taking into account the soil mitigation hierarchy set out in NPF4 Policy
5 in addition to biodiversity enhancement requirements set out under
Policy 3b.
 will carefully consider the implications on Prime Agricultural Land
(PAL) and will avoid/minimise any loss of PAL in accordance with
NPF4 Policy 5 and the associated mitigation hierarchy.
 NPF4 Policy 5 seeks to ensure development proposals protect soil
from damage including from sealing, erosion, and/or compaction.
These issues may influence site specific developer
requirements/considerations including for development allocations.
 Site surveys can support the detailed consideration of carbon rich
soils, peatland, and priority peatland habitat, and prime agricultural
land. This information can support the assessment of sites for
 Tackling the Climate and Nature Crises
(including Climate Change Mitigation and
Adaptation)
 Biodiversity and Natural Places
 Forestry, Woodland and Trees, including
the review of our Forest and Woodland
Strategy
 Historic Assets and Places
 Energy, Heating and Cooling
 Blue and Green Infrastructure (including
Strategic Green Networks) 
 Rural Development
 Landscape Scale Restoration Projects
 LDP3 SEA

Page 278

278
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
potential allocation as well as part of the determination of planning
applications.
 There is no nationally consistent methodology for identifying land of
lesser quality that is culturally or locally important for primary use.
Following stakeholder engagement on this matter, it is not intended
to proceed with designating land under this classification. 
Issue 004: Forestry,
Woodland and Trees
 By considering existing forestry, woodland, and trees assets, and
identifying potential opportunities for enhancement and expansion
via our LDP3 Spatial Strategy, we can help tackle the twin climate and
nature crises.
 No single dataset provides a comprehensive overview of all trees and
woodland of high biodiversity value.  The Native Woodland Survey of
Scotland, the Scottish Ancient Woodland Inventory, the Ancient Tree
Inventory, and Tree Preservation Orders combined provides the best
available information.  Whilst smaller woodlands, tree belts and
hedgerows will be picked up via place specific studies to follow.
 Through the development of our Proposed Plan, site selection should
seek to avoid pure woodland sites, and consideration will be given to
applying Tree Preservation Orders to sites with significant trees or
groups of trees.
 In terms of economic potential, the Land Capability for Forestry Map
dataset considers the potential across Scotland to grow trees.  When
comparing our spatial data, the planting of trees to date corresponds
well with potential tree areas identified under the National scale Land
Capability for Forestry Map.  
 The Council will review our Forestry and Woodland Strategy (FWS) to
ensure it is fully aligned with the National Strategy and National
Planning Framework 4. 
 This FWS review is unlikely to lead to significant changes, however
there may be scope to further focus and refine our spatial framework,
 Tackling the Climate and Nature Crises
(including Climate Change Mitigation and
Adaptation)
 Biodiversity and Natural Places (including
Landscapes and Nature Networks)
 Soils
 Historic Assets and Places
 Perth Green Belt Review
 Energy, Heating and Cooling
 Design, Quality and Place
 Local Living and 20 Minute
Neighbourhoods
 Blue and Green Infrastructure (including
Strategic Green Network)
 Play, Recreation and Sport
 Flood Risk and Water Management
 Infrastructure – Waste Water Treatment
and Water Supply
 Health and Safety
 Tourism
 Forest and Woodland Strategy Review 
 LDP3 SEA
 LDP3 Locality Profiles and Site
Assessments

Page 279

279
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
to further expand, protect and enhance forests and woodlands,
including increasing their resilience to the effects of a changing
climate; helping reverse biodiversity loss, and at the same time
delivering multiple benefits (environmental, economic, and health
and wellbeing).
 The Council will require to liaise with Scottish Water in the case of
any potential development sites which are located within a ground or
surface water protected area, to help identify appropriate mitigation
or precautionary measures.
Issue 005: Historic Assets
and Places
 Historic environment related data sources provide us with
information on the location, type, and status of our heritage assets
within Perth and Kinross and allow us to identify, protect, and where
appropriate enhance valued historic assets and places across the area
in line with Historic Environment Policy for Scotland and NPF4 Policy
7: Historic assets and places.  
 The LDP3 Spatial Strategy should reflect the priorities and principles
of ‘Our Past, Our Future’ Strategy for Scotland’s Historic Environment
2023. 
 The policies contained within the Historic Environment Policy
Scotland should be taken account of and translated into the Plan’s
Spatial Strategy with respect to the historic environment of Perth and
Kinross.
 PKC will ensure there is early and continued engagement with Historic
Environment Scotland with regards to the development of LDP3
Spatial Strategy, its SEA and any related historic environment
appraisals or guidance documents.
 Tackling the Climate and Nature Crises
(including Climate Change Mitigation and
Adaptation)
 Biodiversity and Natural Places (including
Landscapes and Nature Networks)
 Forestry, Woodland and Trees (including
our Forest and Woodland Strategy
Review)
 Soils
 Perth Green Belt Review
 Brownfield, Vacant and Derelict Land and
Empty Buildings
 Energy, Heating and Cooling
 Design, Quality and Place
 Local Living and 20 Minute
Neighbourhoods
 Infrastructure First
 Homes
 Blue and Green Infrastructure (including
Strategic Green Network)
 Play, Recreation and Sport

Page 280

280
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
 Flood Risk and Water Management
 Infrastructure – Communications and
Digital
 Community Wealth Building
 City, Town, Local and Commercial Centres
 Rural Development
 Tourism
 Culture and Creativity
 LDP3 SEA
 LDP3 Locality Profiles and Site
Assessments
Issue 006: Green Belt  Requirement for a review to inform Proposed Plan.
 The LDP3 Spatial Strategy will need to consider whether there is need
to release from the Perth Green Belt any areas of land for planned
growth.  This will be informed by, amongst other things, the finalised
Local Housing Land Requirement and Employment Land Strategy for
the Proposed Plan which will in turn be informed by the NPF4 Spatial
Principles.  Of particular relevance will be the principles of local living,
compact urban growth, rebalanced development, rural revitalisation,
the delivery of a just transition approach to climate change, nature
networks and landscape character.
 Tackling the Climate and Nature Crises
(including Climate Change Mitigation and
Adaptation)
 Biodiversity and Natural Places (including
Landscapes and Nature Networks)
 Forestry, Woodland and Trees
 Historic Assets and Places
 Perth Green Belt Review
 Brownfield, Vacant and Derelict Land and
Empty Buildings
 Energy, Heating and Cooling
 Sustainable Transport
 Design, Quality and Place
 Local Living and 20 Minute
Neighbourhoods
 Infrastructure First
 Homes
 Blue and Green Infrastructure (including
Strategic Green Network)

Page 281

281
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
 Play, Recreation and Sport
 Flood Risk and Water Management
 Infrastructure – Communications and
Digital
 Business and Industry
 Rural Development
 Retail
 Tourism
 Perth and Kinross Council Housing Land
Audit
 Perth and Kinross Council Employment
Land Audit
 LDP3 SEA
 LDP3 Locality Profiles and Site
Assessments
Issue 007: Brownfield,
Vacant and Derelict Land
and Empty Buildings
 Overall proportion of brownfield land in the Perth and Kinross Area is
low, which is positive in terms of visual and environmental impact but
means contribution of such sites towards meeting overall land
requirements could be limited.
 Key localised impacts to consider in developing a spatial strategy are -
the impact on the percentage of the population living near to derelict
land, especially the 11.5% living within less than 500m of derelict
land; significant increase in retail vacancies in some town centres
especially in Blairgowrie and Auchterarder.
 In preparing the Spatial Strategy for the Proposed Plan there will also
be linkages to other topics including:
o Biodiversity in terms of the contribution brownfield land can
make to nature recovery and can in some instances be a better
use of land than development.
 Tackling the Climate and Nature Crises
(including Climate Change Mitigation and
Adaptation)
 Biodiversity and Natural Places (including
Landscapes and Nature Networks)
 Historic Assets and Places
 Perth Green Belt Review
 Zero Waste
 Design, Quality and Place
 Local Living and 20 Minute
Neighbourhoods
 Infrastructure First
 Homes
 Blue and Green Infrastructure

Page 282

282
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
o Blue Green Infrastructure networks and the potential of some
brownfield sites to establish nature-based solutions, for example,
for surface water management.
o Flood risk and the potential to bring brownfield land to uses that
support the management of increasing flood risk from climate
change.
o Design, Quality and Place and the role that the development can
have in improving the quality of an area where brownfield or
derelict land or buildings are having a negative impact on health
and wellbeing.
o City, town, local and commercial centres and the increasing
number of vacant units which some centres are experiencing.
 Play, Recreation and Sport
 Health and Safety
 Flood Risk and Water Management
 Business and Industry
 City, Town, Local and Commercial Centres
 Rural Development
 Retail
 Tourism
 Culture and Creativity
 Perth and Kinross Council Housing Land
Audit
 Perth and Kinross Council Employment
Land Audit
 LDP3 SEA
 LDP3 Locality Profiles and Site
Assessments
 Urban Capacity Studies linked to Local
Housing Strategy and Strategic Housing
Investment Programme
Issue 008: Coastal
Development and
Aquaculture
 With regard to Perth Harbour, if the revision order is approved, and
the harbour is closed for commercial traffic the Proposed Plan will
consider the regeneration and leisure opportunities, alongside the
constraints, which includes flood risk.
 The Proposed Plan will accord with NPF4, refer to future flood maps,
and use the SEA Site Assessment template to assess risk for all
proposals being considered for potential LDP3 allocation.
 Tackling the Climate and Nature Crises
(including Climate Mitigation and
Adaptation)
 Biodiversity and Natural Places (including
Landscapes and Nature Networks)
 Energy, Heating and Cooling
 Design, Quality and Place
 Local Living and 20 Minute
Neighbourhoods

Page 283

283
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
 Based on the Dynamic Coast web maps, and observing there are no
areas at risk from coastal erosion, there does not appear to be
significant concerns relating to the coastline.
 LDP3 will need to identify any areas of undeveloped coastline to
ensure that NPF4 Policy 10: Coastal Development can be
implemented.  However, NPF4 does not define the undeveloped
coastline.  It is unclear whether undeveloped means remote
unspoiled coastline with wild land qualities, or if it is any area outwith
a settlement boundary.  It is currently unclear whether Perth and
Kinross will have any areas of undeveloped coastline.
 The NPF4 policy framework, and Nature Scot (formerly SNH)
landscape and visual guidance are likely to be sufficient for the
consideration of future planning applications for shellfish farms, for
finfish hatcheries and freshwater adult growth stage facilities. 
Together with Marine Scotland National Marine Plan 2015 and its
successor, this policy context will provide appropriate policy context
for marine planning.  Given the limited area and local context, a local
policy is not considered necessary.
 Infrastructure First
 Blue and Green Infrastructure
 Play, Recreation and Sport
 Flood Risk and Water Management
 Business and Industry 
 Rural Development
 Tourism
 LDP3 SEA and Site Assessments
 Strategic Flood Risk Assessment 
Issues 009: Energy,
Heating and Cooling
To meet NPF4 requirement of LDP’s to realise full potential for electricity
and heat from renewable, low carbon and zero emission sources, the
Proposed Plan will require to identify a range of opportunities for energy
development, and future opportunities for renewable energy and
decarbonised heat, and will do so whilst: 
 Considering energy infrastructure and future capacity/demand,
including:
o The ability to connect to the existing network (including any
planned upgrades) which is a key consideration when preparing
an infrastructure-first approach. 
o The utility network, including SSEN Transmission and Distribution
datasets on network capacity, whilst noting there are early-stage
 Tackling the Climate and Nature Crises
(including Climate Mitigation and
Adaptation)
 Biodiversity and Natural Places (including
Landscapes and Nature Networks)
 Forestry, Woodland and Trees, including
the review of our Forest and Woodland
Strategy
 Soils
 Historic Assets and Places
 Perth Green Belt Review

Page 284

284
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
indicative plans for potential new pipeline infrastructure across
Scotland including in the Council Area to support emerging plans
around hydrogen production/transmission.
 Considering the various national and local plans and strategies
covering energy, renewable energy, heat networks, climate action,
and energy demands. 
o Noting that the formal designation of Heat Network Zones, in line
with the requirements of the Heat Networks (Scotland) Act 2021,
is still to take place, and LDPs should consider the area’s Local
Heat and Energy Efficiency Strategy (LHEES) and take into
account areas of heat network potential and any designated Heat
Network Zones (HNZ).
 Identifying and being informed by several environmental and other
considerations including: 
o Designations namely Biodiversity and Natural Places (Landscape),
Soils, Forestry, Woodland and Trees, and Historic Asset
designations
o Key landscape features from Landscape Capacity for Wind (2010)
e.g. Highland Boundary Fault, and important viewpoints/tourist
routes. However, expectations around landscape have shifted,
and the Council’s capacity study for Wind, does not reflect the
current planning policy framework for wind proposals. There are
no plans to update the landscape capacity study however the
draft Renewable Energy guidance consulted on during September
and October 2025 will provide project design and layout
guidance to mitigate landscape impacts and will reference
NatureScot’s Landscape Sensitivity Guidance.
o Cumulative effects from existing operational/consented energy
schemes
 Zero Waste
 Infrastructure First
 Blue and Green Infrastructure
 Community Wealth Building
 Business and Industry
 LDP3 SEA
 LHEES and Heat Network Zones and its
SEA

Page 285

285
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
Issue 010: Zero Waste  The Proposed Plan Spatial Strategy and policy will need to be
informed by NPF4 Policy 12 Zero waste’s support for waste
infrastructure and facilities.
 The Proposed Plan will need to consider whether to retain some
locally important Zero Waste policy wording and whether to
incorporate the LDP2 Supplementary Guidance
 The Proposed Plan will need to assess whether any locations for new
waste management infrastructure require to be identified to support
the circular economy, consistent with NPF4 Policy 12 Zero waste.
 There will be no need for the Proposed Plan to consider areas of
search or sites for new landfill sites and energy from waste sites.
 Tackling the Climate and Nature Crises
(including Climate Mitigation and
Adaptation)
 Brownfield, Vacant and Derelict Land and
Empty Buildings
 Energy, Heating and Cooling
 Infrastructure First
 Community Wealth Building
 Minerals
 Circular Economy

Page 286

286
Liveable Places
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
Issue 011: Design, Quality
and Place
 A wealth of information and evidence exists regarding physical, social,
cultural, economic, and environmental aspects, to help us understand
the existing key characteristics of our Plan Area, as well as the
connections and interactions between our places, and the needs and
ambitions of our communities.   
 The current Perth and Kinross LDP2 brings those different matters
together to provide a good basis of understanding of the local context
and characteristics of the area, and what constitutes high quality
successful places within the context of Perth and Kinross
o Under its spatial strategies
o And in its accompanying supplementary guidance, particularly on
placemaking and our various Conservation Area Appraisals
 Bringing the NPF4 Annex D - Six Qualities of Successful Places through
in the LDP’s Locality Profile and Site Appraisal templates should
ensure all elements are given the appropriate level of consideration
prior to any site proposals being allocated in the Plan
 In developing our LDP3 Spatial Strategy we will consider which
locations, sites or groups of sites might benefit from the production
of a masterplan and will identify this in the Proposed Plan via the site-
specific requirements for those proposals.
 NPF4 Policy 14: Design Quality and Place
will be implemented through the
collective impact of all the other national
planning policies.
 LDP3 SEA, Locality Profiles and Site
Assessments
 Conservation Area Appraisals Review
 Review of our Placemaking Guide
 Identification of masterplan locations
Issue 012: Local Living and
20 Minute
Neighbourhoods
 The next stages of the Development Plan process will include the
update of datasets to provide a more accurate picture of facilities and
services.
 A methodology for the assessment of local living and 20-minute
neighbourhood interventions will be developed.  This will combine
the need for development to be adequately placed and the role that
new proposals can play in the delivery of additional infrastructure for
local communities.
 Tackling the Climate and Nature Crises
(including Climate Mitigation and
Adaptation)
 Sustainable Transport
 Design, Quality and Place, including
possible masterplans
 Infrastructure First
 Homes

Page 287

287
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
 The selection of sites for development will include an evaluation of
sustainable travel options.  Infrastructure for walking and cycling and
public transport services will be assessed to identify existing provision
or enhancement opportunities.
 The location of housing and employment land will consider the
potential for commuting trip generation and will aim to identify
reduction or mitigation opportunities.
 The location of healthcare and educational facilities will be assessed,
aiming to support the accessibility for residents and visitors, and
promoting well integrated places
 Feedback from community consultation exercises, including our Big
Place Conversation and Local Place Plans, will be incorporated to
identify key gaps in the provision of local facilities and inform future
development.
 Utilise masterplans and design briefs to encourage developments to
follow the principles of local living.
 Blue and Green Infrastructure, including
Strategic Green Networks and our Open
Space Audit and Strategy
 Play, Recreation and Sport, including our
Play Sufficiency Assessment
 Community Wealth Building
 City, Town, Local and Commercial Centres
 Retail
 Perth and Kinross Council Housing Land
Audit
 Perth and Kinross Council Employment
Land Audit
 Perth and Kinross Council Mobility
Strategy
 LDP3 SEA, Locality Profiles and Site
Assessments
Issue 013: Blue and Green
Infrastructure
 The Spatial Strategy should seek to safeguard open space through
further engagement with communities and ongoing audit work to
identify valued open spaces for designation in LDP3. 
 Improving access to natural spaces through interventions in priority
locations where the Open Space Strategy and Locality Profiles identify
poor quantity, quality, and/or accessibility to public open spaces.  
 Delivering ecosystem services through Blue Green Infrastructure (BGI)
enhancements identified in the opportunity mapping to improve
multi-functionality of greenspaces.
 Implementing nature-based solutions to projected climate change
impacts by considering the Climate Change Risks and Opportunities
Assessment, Strategic Flood Risk Assessment, Surface Water
Management Plans, and Natural Flood Management Studies.
Opportunity mapping will provide an evidence-base for where and
how BGI design can mitigate local impacts. 
 Tackling the Climate and Nature Crises
(including Climate Mitigation and
Adaptation)
 Identification of nature-based solutions
 Biodiversity and Natural Places iIncluding
Landscapes and Nature Networks)
 Soils
 Forestry, Woodland and Trees
 Historic Assets and Places (Including
Conservation Area Appraisals)
 Perth Green Belt Review 
 Sustainable Transport
 Design, Quality and Place, including
potential masterplan locations

Page 288

288
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
 Developing green networks that, where possible, link to nature
networks, connecting natural spaces in rural and urban areas.  Green
networks include an active travel element that will contribute to Local
Living and 20 Minute Neighbourhoods, mitigating transport related
emissions.  Cross-boundary strategic green networks will be explored
with neighbouring authorities. 
 Focus on delivery through site specific developer requirements for
on-site or off-site contributions.  For large-scale developments, these
requirements will be further detailed through site masterplanning
processes.  As well as delivery through development, opportunities
may be realised through other means such as public sector
programmes and infrastructure investment.   
 Local Living and 20 Minute
Neighbourhoods
 Infrastructure First
 Homes
 Strategic Green Networks and our Open
Space Audit and Strategy
 Play, Recreation and Sport, including our
Play Sufficiency Assessment
 Flood Risk and Water Management,
including Strategic Flood Risk Assessment
and Natural Flood Risk Management
solutions
 Health and Safety
 City, Town, Local and Commercial Centres
 Rural Development
 LDP3 SEA, Locality Profiles and Site
Assessments
Issue 014: Play, Recreation
and Sport
The Proposed Plan should seek to:
 Address play provision in low density settlements (<50 dwellings).
 Increase playground provision for children aged 4-8. Currently only
39% of dwellings in settlements meet the 400m accessibility standard
for this age group.
 Establish a prioritisation of new play, recreation and sport
opportunities for the demographics reported to have the lowest
levels of activity: females, young people aged 12-17, and those living
in the most deprived areas.
 Target development of new facilities in rural hubs in areas
experiencing or expecting significant growth (e.g. Auchterarder and
Kinross)
 Tackling the Climate and Nature Crises
(including Climate Mitigation and
Adaptation)
 Biodiversity and Natural Places (including
Landscapes and Nature Networks)
 Forestry, Woodland and Trees
 Historic Assets and Places 
 Perth Green Belt Review 
 Brownfield, Vacant and Derelict Land and
Empty Buildings
 Sustainable Transport
 Design, Quality and Place, including
potential masterplan locations

Page 289

289
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
 Address demand pressures for new football and rugby pitch provision
in Perth.
 Facilitate development of sports halls: Only 42% of the population
can walk to a sports hall within 20 minutes. 60% of which are living in
the 10% most deprived areas.  Average build date of sports halls is
1980 - the national average is 1990. 
 Facilitate development of sports pitches: Only 35% of the population
is within a 20-minute walk of a pitch. 50% of which are from the 10%
most deprived areas.
 Improve multi-functionality of open spaces through the provision of
new opportunities to address current and future requirements.
 Local Living and 20 Minute
Neighbourhoods
 Infrastructure First
 Homes
 Blue and Green Infrastructure
 Strategic Green Networks and our Open
Space Audit and Strategy
 Flood Risk and Water Management
 Health and Safety
 City, Town, Local and Commercial Centres
 Rural Development
 Culture and Creativity
 LDP3 SEA, Locality Profiles and Site
Assessments
Issue 015: Flood Risk and
Water Management
 The Strategic Flood Risk Assessment will support the Proposed Plan,
helping to understand the spatial implications of NPF4 Policy 22:
Flood Risk and Water Management by promoting avoidance as a first
principle and reducing the vulnerability of existing and future
development to flooding. 
 The Proposed Plan will accord with NPF4, refer to future flood maps,
and use the SEA Site Assessment template to assess risk for all
proposals being considered for potential LDP3 allocation.
 Resilience will also be supported by managing the need to bring
previously used sites in built up areas into positive use (dependent on
the vulnerability assessment) and planning for adaptation measures.
 In terms of Private Water Supplies, NPF4 presumes against these
unless they will be sourced from a sustainable water source that is
resilient to periods of water scarcity.  Drought indicator mapping,
alongside other water scarcity mapping, and Council call out records
for water scarcity, could prove a useful starting point to determine
 Tackling the Climate and Nature Crises
(including Climate Mitigation and
Adaptation)
 Identification of nature-based solutions
 Biodiversity and Natural Places (Including
Landscapes and Nature Networks)
 Forestry, Woodland and Trees
 Perth Green Belt Review 
 Design, Quality and Place
 Infrastructure First
 Homes
 Blue and Green Infrastructure
 Strategic Flood Risk Assessment
 Health and Safety
 Business and Industry

Page 290

290
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
vulnerable locations in the Proposed Plan.  It could potentially help
identify where a Private Water Supplies risk assessment procedure
considering climate change related risks is required and/or
where/when a planning response and mitigations may be required. 
 LDP3 SEA, Locality Profiles and Site
Assessments
Issue 016: Health and
Safety
 For the Proposed Plan, it will be necessary to consider whether the
content of the Supplementary Guidance will need to be incorporated
into a locally tailored policy on Air Quality to complement the
National Planning Framework policies.
 The Council has a responsibility to monitor and improve air quality
and while it is recognised that air quality now forms part of NPF4
Policy 23 Health and safety, there may be an ongoing role for a locally
tailored policy or planning guidance to address local air quality issues,
including in the Perth Air Quality Management Plan, and relating to
our monitoring requirements. 
 The Perth Air Quality Management Plan has recently been reviewed
and is expected to be published later in 2025. The Proposed Plan will
need to address the actions set out in the revised plan. This may
include:
o Gathering evidence on whether there is a need to address
pollution from stoves and boilers in the air quality management
area
o Examining whether emissions from vehicles can be reduced
through encouraging low car developments
o Although the Air Quality Management Plan is not expected to
introduce a need for a Low Emissions Zone in Perth, this issue
was last considered in 2020 and may have been raised again in
consultation so may require examination again in the future
 The Crieff Air Quality Management Area was revoked in 2024
following a review, and the Proposed Plan will need to reflect those
changes
 Tackling the Climate and Nature Crises
(including Climate Mitigation and
Adaptation)
 Forestry, Woodland and Trees
 Energy, Heating and Cooling
 Zero Waste
 Design, Quality and Place
 Local Living and 20 Minute
Neighbourhoods
 Infrastructure First
 Homes
 Blue and Green Infrastructure
 Play, Recreation and Sport
 Flood Risk and Water Management,
including our Strategic Flood Risk
Assessment
 Infrastructure – Communications and
Digital
 Business and Industry
 City, Town, Local and Commercial Centres
 Retail
 Culture and Creativity
 Minerals
 LDP3 SEA, Locality Profiles and Site
Assessments

Page 291

291
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
 Licensed airfields are already safeguarded as described earlier so the
Proposed Plan need not duplicate this. However, the five unlicensed
airfields are safeguarded by the Local Development Plan policy and
associated Supplementary Guidance. This means that the Proposed
Plan will require to continue the designation of a safeguarding zone
around each unlicensed airfield.  The Proposed Plan will also need to
consider whether the contents of the Airfield Safeguarding
Supplementary Guidance will need to be incorporated into Local
Development Plan policy or remain as planning guidance.
 The Local Development Plan will need to maintain an awareness of
the areas of the Plan that are at risk of being affected by coal mining.
It will need to consider whether it should contain a Local
Development Plan policy specifically addressing unstable land
(including areas where development is at risk of being affected by
coal mining).

Page 292

292
Homes
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
Issue 017: Homes  Propose an indicative Local Housing Land Requirement (iLHLR) for
Perth and Kinross Council of 8,700 over 10-year plan period.
 Considers options for meeting the iLHLR including the review of
existing LDP allocations and identification of new sites.
 Proposed Plan Spatial Strategy will need to take account of NPF
policies on Brownfield etc, Local Living and 20 Minute
Neighbourhoods, Infrastructure First, and Rural Development, and
consider the future role of settlement boundaries (as there is no
mention of these in NPF4).
 In addition to the existing suite of LDP housing policies, the Proposed
Plan policy framework will need to consider how best to plan for:
increasing the provision of affordable homes, self-provided homes,
the enhanced emphasis in NPF4 on the delivery of new housing in
rural areas, and homes to meet particular needs.
 Increased emphasis in NPF4 on delivery through the LDP Delivery
Programme.
 Tackling the Climate and Nature Crises
(including Climate Mitigation and
Adaptation)
 Perth Green Belt Review
 Brownfield, Vacant and Derelict Land and
Empty Buildings
 Sustainable Transport
 Energy, Heating and Cooling
 Zero Waste
 Design, Quality and Place, including
potential masterplan locations
 Local Living and 20 Minute
Neighbourhoods
 Infrastructure First
 Blue and Green Infrastructure
 Play, Recreation and Sport
 Flood Risk and Water Management,
including our Strategic Flood Risk
Assessment
 Health and Safety
 City, Town, Local and Commercial Centres
 Housing Land Audit
 LDP3 SEA, Locality Profiles and Site
Assessments
 LDP Delivery Programme

Page 293

293
Infrastructure and Transportation
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
Issue 018: Cemetery
Provision
 As part of the development of LDP3, further collaboration will take
place with the working group to consider potential sites for further
cemetery provision.   This will include consideration of allocating
sites/ search areas through the Proposed Plan.
 Through providing extended cemetery provision there are also
potential opportunities to provide multiple benefits, linking into other
key policy considerations, such as green infrastructure and open
space, and biodiversity enhancement measures. 
 Finding land, which is available and suitable, can be an issue, due to a
range of factors.  LDP3 can support the identification of potentially
suitable sites for extended or new cemetery provision, with a range of
actions identified for supporting site delivery, including undertaking
test digs, detailed site assessments, and consultation with relevant
consultees/ stakeholders.  Therefore, a collaborative approach to
identifying sites for extended/ new cemetery provision will be
required, given the range of likely issues when assessing land for
availability and suitability.
 If there are sites which are potentially available/ suitable, the
Proposed Plan will consider how these can best be delivered through
the planning process i.e. allocation with site-specific requirements in
LDP3. 
 Tackling the Climate and Nature Crises
(including Climate Mitigation and
Adaptation)
 Biodiversity and Natural Places (Including
Landscapes and Nature Networks)
 Perth Green Belt Review
 Brownfield, Vacant and Derelict Land and
Empty Buildings
 Sustainable Transport
 Energy, Heating and Cooling
 Zero Waste
 Design, Quality and Place
 Local Living and 20 Minute
Neighbourhoods
 Infrastructure First
 Blue and Green Infrastructure
 Flood Risk and Water Management,
including our Strategic Flood Risk
Assessment
 Health and Safety
 LDP3 SEA, Locality Profiles and Site
Assessments

Page 294

294
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
Issue 019: Communication
and Digital
 The communications and digital infrastructure of the area has some
shortcomings, which may result in competitive disadvantages for local
businesses and communities, therefore the Proposed Plan will need
to encourage initiatives to improve digital connectivity (in line with
NPF4 Policy 24).
 Tackling the Climate and Nature Crises
(including Climate Mitigation and
Adaptation)
 Perth Green Belt Review
 Zero Waste
 Design, Quality and Place
 Local Living and 20 Minute
Neighbourhoods
 Infrastructure First
 Health and Safety
 Community Wealth Building
 Business and Industry
 City, Town, Local and Commercial Centres
 Rural Development
Issue 020: Education
Facilities
 It is unlikely that the developer contributions policy will be expanded
to cover early years and secondary education, unless specific site
requirements result in a need within a specific catchment. Housing
Land Audit data and planning approvals will assist the Council in
forecasting capacity needs in local primary schools to inform site
allocations and developer contribution requirements.
 It is proposed that the study prepared in 2008 to calculate the Pupil
Product Ratio is refreshed for LDP3 to assist contributions
methodology.
 Energy, Heating and Cooling
 Zero Waste
 Sustainable Transport
 Design, Quality and Place
 Local Living and 20 Minute
Neighbourhoods
 Infrastructure First
 Homes
 Blue and Green Infrastructure
 Play, Recreation and Sport
 City, Town, Local and Commercial Centres

Page 295

295
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
Issue 021: Health Care
Facilities
 Placemaking and creating ‘healthy’ places is a focus of NPF4 Policy 23. 
LDPs should create healthier places and proposals that incorporate
this will be supported.
 Co-location of complementary services is encouraged in NPF4 Policy
23, in partnership with NHS Tayside and Perth and Kinross Health and
Social Care Partnership.
 The Council relies upon evidence from NHS Tayside and the Perth and
Kinross Health and Social Care Partnership to demonstrate
infrastructure needs in the area.  Aspects of this evidence is not
available publicly at present.  The Council is working with both bodies
to inform infrastructure needs because of new development in the
Proposed Plan, as well as supplementary policies that support health
(NPF4 Policy 23).
 Tackling the Climate and Nature Crises
(including Climate Mitigation and
Adaptation)
 Zero Waste
 Sustainable Transport
 Design, Quality and Place
 Local Living and 20 Minute
Neighbourhoods
 Homes
 Infrastructure First
 Play, Recreation and Sport
 Health and Safety
Issue 022: Transportation
(Including Sustainable
Transport)
 Perth and Kinross Council will commission an adequate and
proportionate Transport Appraisal to inform the policy content of the
new LDP.  It is understood that Transport Scotland will publish an
updated Development Planning Transport Appraisal Guidance during
2025.  We will aim to integrate this new guidance into our appraisal.
The Council will work in the commission of a suitable traffic model
that can support the assessment of the LDP and inform land use
allocations.
 The local and regional transport strategies, as well as an appropriate
and effective transport appraisal, will inform the Local Development
Plan, including evidence of transport capacities, and an appraisal of
the spatial strategy on the transport network. 
 The content of the Council’s Mobility Strategy and Tactran’s Regional
Transport Strategy will be incorporated into the Proposed Plan. 
Special consideration will be given to the expectation for future
development to take sufficient action to reduce reliance on the
private car and to enable sustainable travel behaviour.
 Tackling the Climate and Nature Crises
(including Climate Mitigation and
Adaptation)
 Biodiversity and Natural Places (Including
Landscapes and Nature Networks)
 Energy, Heating and Cooling
 Zero Waste
 Design, Quality and Place
 Local Living and 20 Minute
Neighbourhoods
 Infrastructure First
 Blue Green Infrastructure
 Homes
 Health and Safety
 Community Wealth Building
 Business and Industry
 City, Town, Local and Commercial Centres

Page 296

296
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
 The Local Development Plan is required to prioritise future
development sites that can be accessed by sustainable transport
modes.  The Plan’s Spatial Strategy will also reflect the objectives of
the sustainable investment hierarchy.  Accessibility by a range of
transport modes is required and to reduce car-dominance where
possible, with particular cognisance of the rural highland areas within
Perth and Kinross.
 Through the next stages of LDP3, we will ensure there is consistent
collaboration with a range of internal and external partners.  As
described in our Mobility Strategy, successful transport networks rely
on the cooperation between mobility, planning and digital services,
and with the support of other actors both within and outside the
council.  This will aim to deliver decisions that enable optimal
performance across the three domains within the Triple Access
Planning (physical mobility, spatial proximity and digital connectivity)
 Rural Development
 Perth and Kinross Transport Appraisal
 Mobility Strategy Action Plan
 Regional Transport Strategy
Issue 023: Waste Water
Treatment and Water
Supply
 Information on Scottish Water assets will allow the Council to
consider if development should be planned in locations where there
is existing or programmed capacity in the water and waste water
systems.  However, the Proposed Plan Spatial Strategy will also be
fully informed by the SEA work, and the 20 minute neighbourhood
and local living analysis and the Locality Profile work, to ensure
development is focussed on the most sustainable locations.
 Scottish Water are funded to provide increased capacity at Part 4
assets, such as water and waste water treatment works, to meet the
growth needs.  There may be a timing consideration, and there will
be consideration about overall sustainability, and trying to direct to
where there is capacity where appropriate, however, sites will not
ultimately be constrained by current capacity at the waste water or
water asset.
 Tackling the Climate and Nature Crises
(including Climate Mitigation and
Adaptation)
 Biodiversity and Natural Places (Including
Landscapes and Nature Networks)
 Forestry, Woodland and Trees
 Infrastructure First
 Local Living and 20 Minute
Neighbourhoods
 Flood Risk and Water Management
 Homes
 Rural Development
 Business and Industry
 Health and Safety

Page 297

297
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
 During the LDP preparation process, we will continue to engage with
Scottish Water to inform them of likely areas of development.
Scottish Water has reiterated their commitment to not restrict
development.  With due communication and agreement on delivery
timeline and phasing, future residential developments can be
presumed to receive access to public water and waste water services.
 LDP3 SEA, Locality Profile and Site
Assessments

Page 298

298
Productive Places 
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
Issue 024: Community
Wealth Building
 NPF4 Policy 25 requires LDPs to be aligned with any strategy for
community wealth building for the area.
 The extent to which the Proposed Plan should support or compel
local community wealth building initiatives is something that will
need to be considered, considering deliverability issues.
 The Proposed Plan will also need to have regard to the Council’s asset
register and particularly whether there have been any community
asset transfer requests.
 The Call for Ideas and Sites stage of the Proposed Plan will need to
assess the potential for community wealth building as one of several
factors taken into account as part of the process for identifying,
assessing and selecting sites for development proposals.
 Tackling the Climate and Nature Crises
(including Climate Mitigation and
Adaptation)
 Brownfield, Vacant and Derelict Land and
Empty Buildings
 Local Living and 20 Minute
Neighbourhoods
 Business and Industry
Issue 025: Business and
Industry
 There is a generous amount of marketable employment land supply
in the current Local Development Plan of around 290 Hectares.
 Taking account of historic take up of employment land, a large
unanticipated industrial user, and a need for generous flexibility,
suggests a potential minimum 100 Hectare employment land
requirement will be necessary in the Proposed Plan.
 The majority of current allocated employment land supply is
constrained and unlikely to be developed in the short-medium term
without any public sector intervention.
 Delivering Perth and Kinross’ market potential will require more of
the land supply to move beyond allocation into servicing and
marketing.
 The Proposed Plan will consider any potential new employment land
sites, whether any existing ones should be deallocated, and where
mixed-use allocations could improve deliverability and viability of
employment land and/or address local living objectives.
 Tackling the Climate and Nature Crises
(including Climate Mitigation and
Adaptation)
 Biodiversity and Natural Places (Including
Landscapes and Nature Networks)
 Sustainable Transport
 Design, Quality and Place, including
potential identification of masterplan
locations
 Health and Safety
 Infrastructure - Communications and
Digital 
 Community Wealth Building
 City, Town, Local and Commercial Centres
 Rural Development
 Employment Land Audit

Page 299

299
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
 To identify where future business and industry may provide the most
benefit there is a current gap in evidence in terms of the Locality
Profile work which when completed will help inform work on Local
Living and 20 Minute Neighbourhoods.
 Perth and Kinross Council Employment land matrices utilise a
‘balanced scorecard’ approach to determine the sites most likely to
require Council intervention and their relative attributes.  These
matrices will be updated with increased consideration of active
travel, and on generating economic prosperity for all people and
places. 
 LDP3 SEA, Locality Profiles and Site
Assessments
Issue 026: Retail and City,
Town, Local and
Commercial Centres
 NPF4 retail policy has marked a considerable shift in the policy
framework for retail, with a greater focus on a plan led approach,
unless the proposal is in a town centre, or is a neighbourhood scale or
a rurally appropriate proposal.
 NPF4 requires a plan led approach whereby a retail study identifies
any deficiencies in retail provision in terms of quality and quantity so
that appropriate allocation can be made for any needs.
 Analysis of the Perth and Kinross City and Town Centre Retail study in
February 2023, and consideration of its retail forecasts indicates
there should be no requirement to plan for major new retail
development.  However, there will be a need to consider
neighbourhood scale retail.
 Coupar Angus should potentially be redefined as a neighbourhood
centre, and neighbourhood centres should be identified in a more
comprehensive way in the Proposed Plan.
 The evidence all points to a need to move on from retail led city and
town centres towards more multi-purpose destinations in their offer,
use and experience.  There is a need to consider the opportunities for
town centre living.
 Tackling the Climate and Nature Crises
(including Climate Mitigation and
Adaptation)
 Historic Assets and Places
 Brownfield, Vacant and Derelict Land and
Empty Buildings
 Sustainable Transport
 Design, Quality and Place, including
potential identification of masterplan
locations
 Local Living and 20 Minute
Neighbourhoods
 Infrastructure First
 Homes
 Blue and Green Infrastructure
 Play, Recreation and Sport
 Health and Safety
 Community Wealth Building
 Business and Industry
 Retail

Page 300

300
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
 It is unlikely that the Proposed Plan will need to allocate any new
sites for drive-through restaurants.  This analysis is informed by
existing provision/permissions, and NPF4 Policy 27: City, Town, Local
and Commercial centres, which identifies drive throughs are only
appropriate where they would not negatively impact on the principles
of local living or sustainable travel.  There is scope to consider drive
through applications on retail allocations without necessarily
requiring specific allocations for drive throughs.
 Rural Development
 Tourism
 Culture and Creativity
 LDP3 SEA, Locality Profiles and Site
Assessments
Issue 027: Rural
Development
 There is a need for an appropriate tailored approach for rural areas
which considers how to distribute the land supply requirements for
housing, employment uses etc, against the requirement to reduce the
need to travel and avoid suburbanisation of rural communities,
particularly in rural areas which are currently declining and those
rural populations which are most at risk of transport poverty.
 Considering the specific requirement in the Act the Proposed Plan will
need to consider the issue of resettlement and whether it is an
appropriate tool in Perth and Kinross, either by the allocation of
specific sites or areas, or through an appropriate local policy
framework
 The Proposed Plan will need to consider whether a more flexible and/
or innovative approach to housing delivery, particularly affordable
housing, and increasing the resilience of rural areas would be
appropriate considering the support in NPF4.
 Tackling the Climate and Nature Crises
(including Climate Mitigation and
Adaptation)
 Biodiversity and Natural Places (including
Landscapes and Nature Networks)
 Soils
 Historic Assets and Places
 Perth Green Belt Review
 Brownfield, Vacant and Derelict Land and
Empty Buildings
 Coastal Development
 Sustainable Transport
 Design, Quality and Place, including
potential identification of masterplan
locations
 Local Living and 20 Minute
Neighbourhoods
 Infrastructure First
 Homes
 Blue and Green Infrastructure
 Play, Recreation and Sport

Page 301

301
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
 Flood Risk and Water Management,
including our Strategic Flood Risk
Assessment
 Business and Industry
 City, Town, Local and Commercial Centres
 Retail
 Tourism
 Culture and Creativity
 Minerals
 LDP3 SEA, Locality Profiles and Site
Assessments
Issue 028: Tourism  Proposed Plan will need to strike a balance between supporting the
recovery and future growth of the sector against the existing and
potential for adverse impacts on local communities and the
environment of accommodating that recovery and growth.
 A further challenge will be to create sustainable tourism within the
required commitments in NPF4 to tackling the climate and nature
crises.
 NPF4 requires LDPs to identify both suitable locations for
development and areas of pressure.  Within rural areas existing and
future opportunities are likely to be more dispersed and may be more
difficult to plan for.
 Tackling the Climate and Nature Crises
(including Climate Mitigation and
Adaptation)
 Biodiversity and Natural Places (including
Landscapes and Nature Networks)
 Soils
 Historic Assets and Places
 Coastal Development
 Sustainable Transport
 Design, Quality and Place
 Infrastructure First
 Homes
 Blue and Green Infrastructure
 Play, Recreation and Sport
 Health and Safety
 Community Wealth Building
 Business and Industry
 City, Town, Local and Commercial Centres

Page 302

302
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
 Retail
 Rural Development
 Culture and Creativity
 LDP3 SEA, Locality Profiles and Site
Assessments
Issue 029: Culture and
Creativity
 It is crucial that the development of our LDP3 Spatial Strategy reflects
the importance of this sector through protecting existing cultural and
creative workspaces and venues/places/spaces and supporting new
opportunities to help support the sector’s growth.
 There is recognition of the potential of this sector to grow and realise
greater opportunities for the benefit of the region of a whole, not
only for the quality of life of residents, but to enhance the tourism
offer and increase visitor spend.
 It is important that in developing our LDP3 Spatial Strategy that we
support the Region’s seven key business sectors, including its tourism
‘connector themes’ of Creative Industries, Food and Drink, and
Outdoor Adventures, to ensure that land use planning plays its role in
facilitating the strengthening of these sectors via:
o protecting existing facilities and venues
o identifying and supporting opportunities for new proposals, and
the
o delivery of specific projects and actions identified for them,
within the framework of national planning policies and guidance
 In developing our LDP3 Spatial Strategy it is important to understand
the cultural and creative offer within Perth and Kinross, to allow us to
 Tackling the Climate and Nature Crises
(including Climate Mitigation and
Adaptation)
 Biodiversity and Natural Places (including
Landscapes and Nature Networks)
 Historic Assets and Places
 Brownfield, Vacant and Derelict Land and
Empty Buildings
 Zero Waste
 Sustainable Transport
 Design, Quality and Place
 Local Living and 20 Minute
Neighbourhoods
 Health and Safety
 Blue and Green Infrastructure
 Play, Recreation and Sport
 Infrastructure - Communication and
Digital 
 Community Wealth Building
 Business and Industry

Page 303

303
Issue Reference Key Issues for LDP3 Spatial Strategy Key Policy and Other Connections
identify and support the maintenance of an appropriate number and
range of cultural venues and facilities as per Section 15(5) of the
Planning Act, and recognise and support opportunities for jobs and
investment in the creative sector, culture, heritage and the arts for
the Perth and Kinross Area and our communities, in line with NPF4
Policy 31: Culture and Creativity.  Our LDP3 Locality Profile work will
consider in more detail the venues and facilities available in a place
and their role in placemaking, local living, wellbeing, the economy
and tourism.
 City, Town, Local and Commercial Centres
 Retail
 Rural Development
 Tourism
Issue 030: Minerals  NPF4 sets out a requirement that the Local Development Plan should
always support a landbank of construction aggregates of at least 10-
years in the relevant market areas.
 The Proposed Plan will not be able to precisely calculate whether a
10-year landbank exists without improved data on demand and
product flows. It is proposed to close this evidence gap by carrying
out more engagement with the minerals industry, including industry
bodies and active operators. A local aggregates survey is likely to be
necessary.
 Analysis of the 2019 Aggregate mineral survey suggests that in the
Tay area, there are sufficient permitted reserves for crushed rock but
that there may not be sufficient reserves of sand and gravel to meet
the demand for a 10-year landbank, as required by NPF4.
 Tackling the Climate and Nature Crises
(including Climate Mitigation and
Adaptation)
 Biodiversity and Natural Places (including
Landscapes and Nature Networks)
 Historic Assets and Places
 Zero Waste
 Infrastructure First
 Health and Safety

Page 304

304
7 Links to Strategic Environmental Assessment
Requirement for SEA: Perth and Kinross Local
Development Plan 3
7.1.1 The Environmental Assessment (Scotland) Act 2005 requires
qualifying plans, programmes, and strategies (PPS), developed by
public bodies, to be subject to Strategic Environmental
Assessment (SEA).  As the Perth and Kinross Local Development
Plan 3 (LDP3) deals with the subject of town and country planning
or land use and is likely to result in significant environmental
effects (both positive and negative), it classified as a qualifying
plan under Section 5(3)(a) of the 2005 Act, and therefore SEA
requires to be undertaken.  As such, Perth and Kinross Council has
chosen not to carry out SEA Screening for LDP3, but rather to
proceed straight to Scoping stage.  The LDP3 SEA Scoping Report
(Core Doc Ref: CD005) is the record of that process. 
Benefits of SEA
7.2.1 The purpose of carrying out SEA is to help gauge the potential
impact of a public plan on the environment and to identify ways
to minimise any likely negative effects if those effects are
anticipated to be significant.  The SEA process has the potential to
make a real and valuable contribution to the plan preparation
process through ensuring that any likely environmental impacts of
the Plan’s strategy, policies and proposals are fully understood,
and any significant environmental effects are addressed.  Carrying
out SEA for LDP3 will also help ensure that the environment is
given the same level of consideration in the Plan as social and
economic factors.
7.2.2 Part 2, Section 16B of the 2019 Planning Act, requires planning
authorities to compile an evidence report before preparing a local
development plan.   The evidence report should set out the
planning authority’s views on the range of matters which are
listed under Section 15(5) of the Act.   These matters relate to, but
are not limited to, the main physical, cultural, economic, social,
built heritage and environmental characteristics of the area; the
use of land; details about the size, composition, health status and
distribution of the area’s population; the population’s housing and
education needs and the availability of land to meet those needs,
as well as the likely effects of the use and development of land on
those needs; the health needs of the population and how they
might be impacted upon as a result of the use and development
of land; the infrastructure of the area and how it is used, and any
change which the planning authority think might happen in
relation to the list of matters under Section 15(5).
7.2.3 Due to many of the data requirements for this LDP3 Evidence
Report overlapping with the data gathering requirements for the
SEA Environmental Baseline being provided as part of the SEA
Scoping Report, it was considered a more efficient approach to
combine the data gathering for both processes to provide a

Page 305

305
holistic overview of the current state of the environment of Perth
and Kinross, and ultimately a better Plan which has been
thoroughly considered in respect of the likely significant effects of
its implementation.  
7.2.4 A separate SEA Scoping Report has been produced by the Council
for LDP3 which addresses the requirements under the 2005
Environmental Assessment (Scotland) Act.   Despite the overlap in
information between the two evidence gathering processes, it is
not intended to repeat the information in this Evidence Report in
full in the Scoping Report but rather highlight those key baseline
facts which are of relevance to the SEA for the Perth and Kinross
Local Development Plan 3.   
Next Steps
7.3.1 Our LDP3 SEA Scoping Report was submitted to the 3 Consultation
Authorities (Historic Environment Scotland, Nature Scot, and
SEPA) at the end of February 2025.  Those Authorities will
consider the proposed scope and level of detail to be included in
the environmental assessment of LDP3, and the suggested
consultation period for the SEA Environmental Assessment and
Proposed LDP3.  The Consultation Authorities will then provide
their views on these matters to the Council, which we will
consider in the development of our environmental assessment. 
The Scoping Report will also be submitted alongside the LDP3
Evidence Report to the DPEA for the ‘Gate Check’ process.

Page 306

306
8 Local Place Plans
INVITATION TO PREPARE LOCAL PLACE PLANS
8.1.1 In October 2023, Perth and Kinross Council emailed an invitation
to all Community Councils highlighting the opportunity for
Community Councils (and constituted Community Bodies) to
express an interest in preparing a Local Place Plan (LPP) for their
area.  This invitation was issued in accordance with Section 15A(a)
of the Town and Country Planning (Scotland) Act 1997 as
amended.
8.1.2 The proposed timeline for LPPs to inform the next Local
Development Plan (LDP) was included in the invitation, and also in
our Development Plan Scheme (Core Doc Ref: CD014)
8.1.3 The timeline set out that we plan to begin preparation of the
Proposed LDP3 in early 2025 so that LPPs that are registered
before the start of its preparation would therefore have most
opportunity to be considered when preparing the LDP3.
8.1.4 To date, 3 Local Place Plans have been received for Blairgowrie
and Rattray, Errol, and Fossoway and District.  4 Community
Bodies have committed to preparing an LPP (representing the first
4 areas on the following list), and there have been expressions of
interest from a further 10 groups. 
8.1.5 Expressions of interest for LPPs were received for the following
areas:
 Aberfeldy and surrounding area, led by Aberfeldy
Development Trust
 Braco and Greenloaning, led by Ardoch Development Trust
Cleish and Blairadam Community Council area 
 Scone Community Council area
 Alyth area, led by Alyth Development Trust
 Comrie Community Council area
 Crieff Community Trust area
 Earn Community Council area
 Glenlyon and Loch Tay Community Council area
 Kettins Community Council area
 Kinross area
 Meigle and Ardler Community Council area
 Wolfhill
 PH8 (including Dunkeld and Birnam)

Page 307

307
ASSISTANCE PROVIDED TO LOCAL COMMUNITIES
8.2.1 The support offered by the Council to assist Community Councils
and Community Bodies to prepare LPPs included:
 Online resources in the form of a dedicated Local Place
Plans page on the Council’s website Local Place Plans -
Perth and Kinross Council(Core Doc Ref: CD052), and
 In-person assistance in the form of presentation and Q and
A sessions at the annual Planning Users Forum, and the
Community Council Forum.
8.2.2 The website includes an introduction to LPPs and a resources
section with links to guidance and assistance to help Community
Councils and Community Bodies decide whether an LPP would be
for them.
8.2.3 There is a link to our Guidance and Assistance Note (Core Doc Ref:
CD053) that contains links to information, guidance and tools to
help develop an LPP.  This note includes links to the matters to
which the Community Council or Community Body must have
regard when preparing an LPP and includes a link to information
on how they can ensure that their LPPs meet the specific
requirements set out in the Scottish Government Planning Circular
1/2022: Local Place Plans.(Core Doc Ref: CD054)
8.2.4 The website also includes a link to an online enquiry form that
Community Councils and Community Bodies may use to notify the
Council if they are interested in preparing an LPP or would like
advice relating to them.
8.2.5 Once the first Local Place Plan is received for registration, the
Council will add a Register of Local Place Plans to the dedicated
Local Place Plans webpage (Core Doc Ref: CD052) on the main
Perth and Kinross Council website.  This will meet the
requirements of the Act and the Circular.

Page 308

308
9 Approval of Evidence Report 
APPROVAL PROCESS AND NEXT STEPS
9.1.1 Before a planning authority can submit their Evidence Report to
the Gate Check process for assessment, the Planning Act requires
that it is approved by Full Council.  The Development Plans Team
prepared a Draft Evidence Report for Resubmission and
accompanying Committee Report for the consideration and
approval at a meeting of Perth and Kinross Council (Full Council)
scheduled for 10th December 2025.  At this meeting, Members
will be asked to approve the Evidence Report Resubmission and
delegate authority to the Strategic Lead (Economy, Development
and Planning) to submit it to the Scottish Ministers via the Scottish
Government’s Planning and Environmental Appeals Division
(DPEA) for the Gate Check process.   
9.1.2 Upon receipt of our Evidence Report, the DPEA will appoint a
‘Reporter’ to examine the Report.  If, following the assessment of
the resubmitted Evidence Report, the ‘Reporter’ finds it to contain
sufficient information to allow the Council to prepare our
Proposed Local Development Plan 3, we will proceed to that next
plan preparation stage.
9.1.3 If the ‘Reporter’ does not find the Evidence Report to contain
sufficient information, they will prepare a report setting out the
reasons for not being so satisfied, and any recommendations for
improving the Evidence Report, and send that report to both the
planning authority and the Scottish Ministers.  On receipt of that
report, planning authorities are expected to revise their Evidence
Report and resubmit to the Scottish Ministers.

Page 309

309