Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
E: dpea@gov.scot                                     T: 0300 244 6668
Town and Country Planning (Scotland) Act 1997 
Gate Check: Section 16B(10) 
Assessment Report  
 
Decision 
My assessment is that the evidence report submitted by Perth and Kinross Council contains
insufficient information to enable the planning authority to prepare its local development
plan. Consequently, the evidence report is returned to the council. This assessment report
details the reasons for this decision and sets out my recommendations for improvement. 
Preliminary matters 
The Perth and Kinross Evidence Report was submitted to the Scottish Ministers on 27
March 2025. I was appointed to carry out the required Gate Check on 9 April 2025. I have
carried out my assessment in the context of the relevant legislative provisions of the Town
and Country Planning (Scotland) Act 1997 (‘the Act’). In doing so I have taken account of
National Planning Framework 4 (NPF4) and its associated guidance (Guidance on Local
Development Planning in Scotland 2023).  My assessment relies on the evidence report
including its linked documentation.   
I issued one request for further information to the council, relating to details of the
engagement responses received. The council’s response was received on 10 June 2025
and assisted in clarifying the nature and extent of these responses. 
A copy of this report has been sent to the council and to the Scottish Ministers.   
Reasons for return under Section 16B (10) of the Act 
1. The evidence report collates an impressive amount of information, and appears to be
a largely comprehensive overview of the evidence available to the council at this time.
However, I find that evidence on some fundamental matters is missing. In particular, I find
that the planning authority’s submission does not provide: 
Decision by Stephen Hall, a Reporter appointed by the Scottish Ministers 
 Evidence Report Reference: GATE-340-1
 Perth and Kinross Local Development Plan Evidence Report Gate Check 
 Date of submission to Gate Check: 27 March 2025
 Procedure: Further Written Submissions   
Date of Notice:   08 July 2025

Page 2

GATE-340-1     2 
 the authority’s view on the capacity of education services in the district, as required
by sections 16B(3)(a) and 15(5) of the Act; or
 sufficient information to enable the planning authority to prepare a local development
plan, in particular in respect of the large number of identified gaps relating to
emerging reports, strategies and analysis that remained outstanding at the time the
evidence report was submitted. 
2. In these circumstance, section 16B(10) of the Act requires me to prepare an
assessment report setting out my reasons for not being satisfied that the evidence report
contains sufficient information to enable the planning authority to prepare a local
development plan, and recommendations for improving the evidence report. 
3. The assessment schedules included as Annexes A and B to this report set out in
detail my specific reasons for return and provide a fuller explanation of the points
summarised below.  Annex A considers the matter of education capacity, and explains why I
consider that the evidence report contains insufficient evidence relating to the capacity of
schools in the area. Annex B considers the volume of emerging reports, strategies, audits
and studies that remained outstanding at the time the evidence report was written. It
explains my conclusion that the volume of this missing information is so extensive that
sufficient information could not be said to exist at this time to enable the authority to prepare
a local development plan. 
4. Some of the individual points raised may not have pointed to an overall insufficiency
in themselves. However, the fundamental nature of some of the issues, particularly in
relation to education, lead me to conclude that the evidence report is insufficient. The
evidence report is intended to be a single and transparent guide to the evidence on which
plan preparation is based and the Act does not enable me to make changes without return
to the planning authority. 
5. Return of the report will enable the planning authority to capture the relevant matters,
engaging with others as appropriate. Consequently, I return the evidence report to the
council for revision prior to re-submission.         
6. The assessment schedule included as Annex C to this report relates to a range of
other matters that would not individually have led me to conclude that the report was
insufficient, but where I consider that the authority could reflect on potential improvements
to the report or further work in advance of the preparation of the proposed plan. 
Recommendations for improving the evidence report (Section 16B(10) of the Act)   
7. The following paragraphs set out recommendations for improving the Evidence
Report. 
Education Capacity 
8. Based on my assessment in Annex A, I recommend that the authority addresses the
matter of education capacity by:
 Clearly setting out (perhaps in tabular form) existing and projected school rolls
(taking account of demographic change and committed development) over the plan
period;
 Describing any planned or programmed improvements or changes to the school
estate that could affect capacity;

Page 3

GATE-340-1     3 
 Identifying the parts of the plan area likely to be constrained due to school capacity
issues, or where further intervention would be required to enable growth;
 It would be helpful if the report could also discuss the interventions necessary to
resolve these constraints (e.g. catchment reviews, extensions or new schools), but I
do not consider this to be essential;
 Identifying and providing the evidence sources on which this evidence is based
(hyperlinks will suffice); and
 Summarising the implications of this evidence for the proposed plan. 
Emerging Reports and Strategies 
9. Based on my assessment in Annex B, I recommend that the authority addresses the
matter of the volume of emerging reports and strategies that remain outstanding by:
 Taking advantage of the return of the report to update the text in respect of the range
of reports, strategies and other analytical work that has completed since the writing
of the original document;
 Considering the timing of any resubmission with respect to any reports, strategies
and other analytical work that is expected to be finalised in the near future; and
 Where important documents will not be finalised ahead of resubmission, ensuring
that the report clearly states the level of commitment to completing this work, the
timescale which is anticipated, and the role of relevant stakeholders. 
Other Advisory Comments 
10. Based on my assessment in Annex C, I recommend that the authority takes a view
as to whether the range of other matters discussed in this schedule can be addressed
through amendments to the evidence report, or otherwise in preparatory work ahead of the
proposed plan. 
Next Steps under Section 16B(11) of the Act 
11. The planning authority should now amend its submission and submit a revised
evidence report to Scottish Ministers for a subsequent gate check. It would be helpful if this
submission included a clear narrative, perhaps in tabular form, setting out how the matters
raised in this report have been addressed in the resubmission. For forward planning
purposes, the council is requested to keep DPEA informed of the anticipated timeline for
resubmission.     
Stephen Hall
Reporter

Page 4

GATE-340-1     4 
Annex A - Education Capacity   
Legislative Context
(1997 Act) includes: 
 Section 16B(3)(a) the planning authority to set out its views
on the matters listed in section 15(5). 
 Section 15(5) the education needs of the population of the
district and the likely effects of development and use of land
on those education needs. 
 Section 15(5) the capacity of education services in the
district. 
 Section 15(5) the infrastructure of the district (including
communications, transport and drainage systems, systems for
the supply of water and energy, and health care and
education facilities). 
 Section 15(5) how that infrastructure is used. 
 Section 15(5) any change which the planning authority
think may occur in relation to any of these matters. 
Planning Policy and
Guidance: 
 NPF4 Policy 18 Infrastructure First 
 Scottish Government Local Development Planning
Guidance (2023) 
Sections of the
evidence report: 
 Evidence Report Appendix D Issue 20: Infrastructure –
Education Facilities  
Assessment context 
A1.   My assessment is set in the above context. In particular, section 16(3)(a) of the
Act, in combination with section 15(5), requires the authority to set out its view on
the education needs of the population, the likely effects of development on those
needs and the capacity of education services. Page 67 of NPF4 indicates that LDPs
should be based on an integrated infrastructure first approach and be informed by
evidence on infrastructure capacity, condition, needs and deliverability. The glossary
defines infrastructure first as encompassing education, including early years,
primary, secondary, further and higher education services. The plan should set out
the infrastructure requirements to deliver the spatial strategy, informed by the
evidence base.    
A2.   The LDP Guidance, paragraph 92 states that the evidence report can support
an Infrastructure First approach by including an assessment of the capacity of
existing infrastructure and services. Pages 67 to 69 set out Scottish Ministers’ advice
on how planning authorities can take into account NPF4 national planning policies
when preparing their evidence report. It is suggested that the evidence report may
include a review of existing infrastructure capacity and condition, as well as
identifying planned infrastructure. An assessment of broad areas of infrastructure
constraint or capacity can indicate where there is scope for future growth in line with
the infrastructure investment hierarchy, or where intervention will be required to
support future development. 
A3.   At page 132, the guidance also states that where planning authorities intend to
seek developer contributions for delivery of infrastructure, including education
infrastructure, the approach to be set out in the LDP may benefit from being
developed collaboratively with infrastructure providers.

Page 5

GATE-340-1     5 
Treatment of Education in the Evidence Report 
A4.   The most detailed information in relation to education infrastructure is
presented at Issue 20 in Appendix D. This summarises the Learning Estate Strategy,
demographic changes in Perth and Kinross, and describes the existing learning
estate. The locations of nurseries and schools are mapped. Some information is
provided regarding the condition and suitability of the school estate. 
A5.   As regards primary school capacity, it is stated that capacity levels will be set
out, but this is not done within the evidence report or, it would appear, in any
supplied background document. It is noted that certain primary schools have low
pupil numbers while others are operating at 90 to 100% capacity, but these are not
named or spatially identified. The council apparently monitors pupil rolls in relation to
housing development using information provided in the housing land audit, but this
analysis is not presented. 
A6.   A case is made that interventions such as extensions and replacement schools
may be required, and that the funding for this may, in part, be recouped through
developer contributions. Elsewhere it is said that new school sites may be required
as part of site allocations. But there is no indication as to in which parts of the
authority’s area either of these approaches may be needed. 
A7.   As regards secondary school capacity, a general statement is included to the
effect that it is anticipated that existing secondary school infrastructure can
accommodate pupil projections, calculated on the basis of population changes and
housebuilding activity. No need for developer contributions is anticipated. 
A8.   The summary of implications for the proposed plan does not draw any spatial
conclusions, for instance about which parts of the plan area have spare existing
schools capacity and which areas are constrained. In terms of gaps and
uncertainties, it is stated that ‘additional school roll capacity needed to accommodate
new development proposals for LDP3 will be assessed by the Council by reviewing
individual primary catchment areas and capacity’. It is clear that this exercise has not
been undertaken to date, and so has not fed in to the content of the evidence report. 
Discussion 
A9.   This section of the evidence report does not present a clear picture of the
existing and projected education capacity in the council area. At page 8 of Issue 20 it
is stated that capacity levels will be set out, but this information should have been
included within the evidence report itself. I would have expected this analysis to
include forecasting of future capacity based on current demographic trends and
committed development. This could most usefully have been achieved with a clear
table setting out which schools were forecast to have spare capacity, and which
were at or approaching capacity, over the projected plan period. I do not consider
that the broad high level statements that are provided on this topic are sufficient or
can be said to fully or adequately describe the current and projected capacity of
schools in the plan area. 
A10.   This is an important matter related to a legislative provision. Section 15(5) of
the Act includes the capacity of education services in the district among the matters
that the authority is expected to set out their views in the evidence report. The fact
that the authority commits to carrying out this work going forward indicates that this

Page 6

GATE-340-1     6 
is not an excessively onerous or technically difficult task. No reasons are given as to
why this analysis has not already been done and presented in the report. 
A11.   Particularly in the primary sector, the matter of the capacity and sufficiency of
existing schools is important given the council’s apparent desire to continue to seek
developer contributions to fund new provision. The council can no longer rely on
statutory supplementary guidance to set out the principles of its policy on developer
contributions, and so it is particularly important that the evidential justification for any
such contribution policies is set out in the preparation of the proposed plan. 
A12.   Further explanation could also usefully be provided as to how education
colleagues have been involved in the preparation of this part of the evidence report. 
A13.   I have carefully considered whether this matter merited the return of the
report. I am conscious that the volume of new land release in the forthcoming plan
may be modest, and that it may be that education matters relating to existing
strategic releases have been largely resolved. The gap may be of less significance
in the secondary sector where no developer contributions are anticipated. However,
I cannot overlook the specific legislative requirement relating to this matter. It is also
important for me to avoid sending any signal to other authorities that this detail is a
matter appropriately addressed at a later stage. That is not the case. 
Conclusion and Recommendation 
A14.   For the reasons stated, I find the evidence report to be insufficient with regard
to education capacity. I recommend that the authority addresses this matter by:
 Clearly setting out (perhaps in tabular form) existing and projected school
rolls (taking account of demographic change and committed development)
over the plan period;
 Describing any planned or programmed improvements or changes to the
school estate that could affect capacity;
 Identifying the parts of the plan area likely to be constrained due to school
capacity issues, or where further intervention would be required to enable
growth;
 It would be helpful if the report could also discuss the interventions necessary
to resolve these constraints (e.g. catchment reviews, extensions or new
schools), though I do not consider this to be essential;
 Identifying and providing the evidence sources on which this evidence is
based (hyperlinks will suffice); and
 Summarising the implications of this evidence for the proposed plan.

Page 7

GATE-340-1     7 
Annex B - Emerging Reports and Strategies   
Legislative Context
(1997 Act) includes: 
 Section 16B(3)(a) the planning authority to set out its views
on the matters listed in section 15(5)
 Section 15(8) the appointed person to assess whether the
report contains sufficient information to enable the planning
authority to prepare a LDP
Planning Policy and
Guidance: 
 NPF4 
 Scottish Government Local Development Planning
Guidance (2023) 
Sections of the
evidence report: 
 Evidence Report Issue 2 - Biodiversity and Natural
Places
 Evidence Report Issue 4 - Forestry, Woodland and
Trees
 Evidence Report Issue 5 - Historic Assets and Places
 Evidence Report Issue 6 – Green Belt
 Evidence Report Issue 7 - Brownfield, Vacant and
Derelict Land, and Empty Buildings
 Evidence Report Issue 8 - Coastal Development and
Aquaculture
 Evidence Report Issue 9 - Energy, Heating and
Cooling
 Evidence Report Issue 10 - Zero Waste
 Evidence Report Issue 13 - Blue and Green
Infrastructure
 Evidence Report Issue 15 – Flood Risk and Water
Management
 Evidence Report Issue 17 - Homes
 Evidence Report Issue 22 - Transportation
 Evidence Report Issue 25 - Business and Industry
 Evidence Report Issue 28: Tourism  
Assessment context 
B1.   My assessment is set in the above context. It is clear from section 16B(8) of the
Act that evidence reports need to contain sufficient information to enable the
planning authority to prepare its LDP. Paragraph 79 of the LDP Guidance states that
the aim of the evidence report is to front-load the work and use the evidence to
clearly inform what to plan for before the proposed plan looks at where development
should take place. Paragraph 84 emphasises that taking time to get this stage of
development planning right is important. 
Evidence Report 
B2.   Within the various topics discussed in the evidence report, the authority
frequently acknowledged that contributory reports, strategies and other analytic work
was currently missing or out-of-date. In many cases work to fill these gaps was
stated to be underway, or was planned to take place ahead of the publication of the
proposed plan. The most significant examples are listed in the table below, including
a note of what the evidence report says about the timescale for addressing each
gap.

Page 8

GATE-340-1     8 
Discussion 
B3.   The Local Development Planning Guidance recognises that there may
potentially be gaps in the evidence, and the council is to be commended on clearly
and straightforwardly acknowledging those gaps that it has identified. However a
stronger narrative on the concrete actions the council intends to take to address the
identified gaps, and the timescales for these, is sometimes missing. 
B4.   The overall impression is of a document conscientiously and comprehensively
collated from the information available at this time, but that suffers from the amount
of reports, strategies and analytical work that remains outstanding. Several
important data sources are either missing or relatively dated. Those that I consider
to be most significant are listed below. 
B5.   In the main, these gaps are acknowledged in the report and some commitment
exists to complete these work streams in relatively short order. I acknowledge that
the completion of all this work is not necessarily in the council’s gift, and that a
perfect co-ordination of the wide range of reports, studies and strategies across
multiple agencies and sectors will never be possible. But given the volume of activity
that appeared to be underway or anticipated on many of these items when the
evidence report was written, the council could potentially have considered delaying
the evidence report until a more complete suite of up-to-date information was
available. 
B6.   Below I have set out the missing items that I consider to be of most importance.
All these gaps are acknowledged in the evidence report and I have also referenced
what the evidence report says regarding the timescale for carrying out this work. In
many cases it is clear that the relevant report, analysis or strategy is likely to now be
complete. In other cases the work is expected to be complete in relatively short
order. In the final column I have included my inferences and recommendations on
each item. 
Issue Important
Information
Gaps
Timescale for
resolution as
stated in the
Evidence Report
Reporter’s Comments
and
Recommendations
2 -
Biodiversity 
and Natural
Places
A review of the
Tayside
Biodiversity
Partnership Local
Biodiversity Action
Plan
Will coincide with
the development of
the Proposed Plan
A clearer commitment
and timescale could
usefully be provided in
the revised report
Local Biodiversity
Sites programme
Will not be
complete until mid-
2025
Would appear to be
available in time to
include in revised report
Nature networks Further
engagement is
ongoing, and is
likely to run
through 2025 for
landscape scale
Nature Networks,
which will be
Would appear to be
available in time to
include in revised report

Page 9

GATE-340-1     9 
developed
alongside green
infrastructure and
green network 
identification.
4 - Forestry, 
Woodland and
Trees
Forestry and
Woodland
Strategy
Will require a
review
A clearer commitment
and timescale could
usefully be provided in
the revised report
5 - Historic
Assets 
and Places
Conservation
Area Appraisals
A rolling review
programme in
place for reviewing
our list of
Conservation
Areas which is
expected to be
completed during
2025-2026.
Would appear to be
available in time to
include in revised report
6 – Green Belt Green Belt
Review
The timing of the
review will be
important as it will 
need to be
informed by other
pieces of work,
such as the locality
profile work, work
on 20 minute
neighbourhoods,
and the spatial
strategy itself. For
this reason, it was
not considered
appropriate to
carry out the green
belt review at
Evidence Report
stage. It will,
however, need to
be undertaken
prior to the site
selection process.
While some valid
reasons have been
given for delaying the
full review until closer to
the publication of the
proposed plan, there
may be opportunities to
include various
contributory
components in any
revised report. These
components could
include new
development and
development pressures
since the last review,
the presence of major
businesses and uses in
the green belt,
landscape change
since the last review,
and the ongoing
contribution of different
parts of the green belt
to the outcomes set out
in NPF4.
7 - Brownfield, 
Vacant and
Derelict 
Land, and
Empty 
Buildings
Register of
potential
brownfield
regeneration
sites/ urban
capacity study
A pilot exercise
has so far been
undertaken. The
process has been
reviewed and
refined and will be
rolled-out across
the Perth and
Kinross area
A potentially important
piece of work, the
outputs of which could
have significant
implications for
regeneration and land
supply. A clearer
commitment and
timescale could usefully

Page 10

GATE-340-1     10 
be provided in the
revised report.
8 - Coastal
Development
and
Aquaculture
Coastal Change
Adaption Plan
The Council has
received funding,
and if it is available
timeously it will
inform the
Proposed Plan.
A clearer commitment
and timescale could
usefully be provided in
the revised report
9 - Energy, 
Heating and
Cooling
Formal
Designation of
Heat Network
Zones
Still to take place No timescale given. 
A clearer commitment
and timescale could
usefully be provided in
the revised report.
Renewable
Energy guidance
Programmed to be
updated in 2025
Would appear to be
available in time to
include in revised report
10 - Zero
Waste
Waste
Management Plan
Covers the period
2010-2025 but is
likely to be
updated
No timescale given. 
If replacement plan still
not available to
describe in the revised
report, a clear
commitment and
timescale could usefully
be provided.
13 - Blue and 
Green
Infrastructure
Open Space
Quality Audit
Not expected until
summer 2025
Would appear to be
available in time to
include in revised report
Open Space
Strategy
To follow at the
end of 2025
Would appear to be
available in time to
include in revised report
15 – Flood
Risk and
Water
Management
Surface Water
Management
Plans
A surface water
management plan
is currently being
prepared for
several 
communities. The
initial phase of the
Perth Surface
Water 
Management Plan
is estimated to
complete in Spring
2025
Would appear to be
available in time to
include in revised
report.
SEPA future flood
maps
Will be updated to
reflect the UK
2018 climate
change 
projections
If now available, should
be referred to in the
revised report.
17 - Homes An updated needs
assessment on
the
accommodation
Will need to be
carried out 
A clearer commitment
and timescale could
usefully be provided in
the revised report

Page 11

GATE-340-1     11 
needs of Gypsy/
Travellers and 
Travelling Show
people
22 -
Transportation
Public transport
route and
passenger data
Being collated by
the Public
Transport team at
the time of writing
If now available, could
usefully be provided in
the revised report
25 - Business
and Industry
Economic Action
Plan
Will be available
by end of 2024
This would appear to
be a significant
potential input into the
spatial strategy of the
forthcoming plan.
Would appear to be
available in time to
include in revised
report.
28: Tourism Tay Cities Region
Tourism Strategy
2019-2024 and
Perthshire
Tourism Action
Plan 2021-2025 
A new economic
plan for Perth and
Kinross is currently 
being developed
These reports appear
to have now expired.
Some clearer
explanation as to
whether they are to be
replaced individually, or
whether the new
economic plan will
perform this role, and in
what timescale should
be provided. 
General Locality Profile
exercise 
Would seem to be an
important part of the
evidence base for the
forthcoming plan, with
the potential to inform
thinking on issues
including 20-minute
neighbourhoods,
placemaking and local
infrastructure capacity. 
If outputs still not
available to describe in
the revised report, a
clear commitment and
timescale could usefully
be provided. 
B7.   I recognise that the existing LDP was adopted in 2019, and that there is some
urgency in expediting the LDP timetable. However, I do not consider that the return
of the evidence report on the basis of the volume of contributary information that
remains outstanding need cause excessive delay. The council has largely
acknowledged the gaps and expects many of them to be filled ahead of the
publication of the proposed plan. The proposed plan cannot practically be prepared
until many of these workstreams are complete in any event. In order for the spatial

Page 12

GATE-340-1     12 
strategy and site selection process of the emerging plan to be fully and properly
informed, it is necessary for many of these reports and strategies to be in place. 
B8.   There is no expectation that each and every item I have listed above will
necessarily need to be completed ahead of any resubmission. However, where this
is not possible, the report should include a clear statement as to the level of
commitment to this work, its timing and the role of relevant stakeholders. 
B9.   I acknowledge that some gaps are likely to remain, as will be the case for most
evidence reports, and as the Local Development Planning Guidance acknowledges.
But it is to be hoped that the number of such gaps can be reduced to a level that will
allow me to conclude that sufficient up-to-date information is now available to
properly inform the preparation of the local development plan. The focus of this
reason for return is not on any expectation that the council need necessarily devote
additional resource to preparing any further reports, studies or analysis than it has
already committed to. Rather, the focus is on the timing of this work in relation to the
finalisation of the evidence report, and on ensuring that the evidence report can take
account of the outputs of workstreams that already appear to be underway. 
B10.   The council should also consider the best timing for the publication of the
proposed plan to ensure that as much of this information as possible is in place in
time to inform it. 
B11.   This schedule and the insufficiency it describes relates to the volume of
reports and strategies that remain outstanding across the evidence report, and not to
the detailed treatment of individual topics. Where I have particular comments to
make on the policy issues affected, these are included as advisories in Annex C to
this report. 
Conclusion and Recommendation 
B12.   For the reasons stated, I find the evidence report to be insufficient with regard
to the volume of emerging reports, strategies and analysis that remains outstanding.
I recommend that the authority addresses this matter by:
 Taking advantage of the return of the report to update the text in respect of
the range of reports, strategies and other analytical work that has completed
since the writing of the original document;
 Considering the timing of any resubmission with respect to any reports,
strategies and other analytical work that is expected to be finalised in the near
future; and
 Where important documents will not be finalised ahead of resubmission,
ensuring that the report clearly states the level of commitment to completing
this work, the timescale which is anticipated, and the role of relevant
stakeholders.

Page 13

GATE-340-1     13 
Annex C - Other Matters (Advisories)   
Legislative Context
(1997 Act) includes: 
 Section 16B(3)(a) the planning authority to set out its views
on the matters listed in section 15(5)
 Section 15(8) the appointed person to assess whether
the report contains sufficient information to enable the
planning authority to prepare a LDP
Planning Policy and
Guidance: 
 NPF4 
 Scottish Government Local Development Planning
Guidance (2023) 
Sections of the
evidence report: 
 All  
Assessment context 
C1.   My assessment is set in the above context. Section 16B(10) of the Act only
requires assessment reports to set out reasons why the appointed person is not
satisfied that the evidence report contains sufficient information, and
recommendations for improvement. However, reporters have found it useful, both in
cases where evidence reports have been found to be sufficient and insufficient, to
also include advisory comments. These have included noting examples of good
practice as well as highlighting areas that, though not pointing to an overall
insufficiency, would nevertheless benefit from being given further consideration by
the planning authority. 
C2.   In carrying out my assessment of this evidence report, I noted a number of
such other matters, some of which apply across various topics and some which are
topic specific. In general terms, these largely relate to the expectations of NPF4 and
to government guidance rather than being directly attributed to the requirements of
the Act under section 15(5). However, in some cases legislative provisions are
relevant, and moving forward there is a requirement to take NPF4 into account.
These other matters would not individually have led me to conclude that the report
was insufficient, but are included below for the authority’s consideration in revising
the report and, in due course, preparing its proposed LDP. 
Advisory Comments on the Evidence Report 
General Comments 
C3.   The evidence report collates an impressive amount of information, and appears
to be a largely comprehensive overview of the evidence available to the council at
this time. The discussion of the individual issues in the report broadly follows the
template suggested at Figure 7 of the Local Development Planning Guidance. This
will have assisted the council to brigade the necessary information. Generally I found
that the report did a good job of summarising the suite of individual relevant reports
and strategies (insofar as these were available at the time), the implications for the
proposed plan and any gaps or disputes. But it was occasionally somewhat weaker
in capturing an overall narrative as to the main spatial issues affecting particular
topics in the plan area, for instance in providing an overview of shopping patterns,
green networks or mineral reserves in Perth and Kinross.

Page 14

GATE-340-1     14 
C4.   With an overall length of over 1,200 pages, I consider the scale of the
document to be excessive. The splitting of the discussion of topics between the main
report and appendices necessitated a great deal of repetition that I did not find
helpful. However, I did find that the tables of gaps and disputes in the main report
facilitated my identification of the main matters of potential concern. 
C5.   I am satisfied that the council took the views of most relevant parties into
account in the preparation of the final evidence report.  However, I note that some
parties I would have expected to be involved appear not to have been, including
neighbouring roads authorities and public transport service providers. 
C6.   Consultation was focussed around topic papers, which is a reasonable
approach. But in some cases, particularly where changes were made to the report in
response to comments, some follow-up correspondence would have been useful to
secure confirmation that the relevant party was content with changes made. This
appears to have happened in some cases (for instance with Transport Scotland), but
not consistently. 
C7.   The use of online forms to gather responses may have merit, but the outputs of
such an exercise need to be presented in a way that is transparent and easy to
follow. A clear and full paper trail of parties’ responses was not submitted to the gate
check which necessitated a request for further information to satisfy myself that
parties’ views were properly taken into account. 
Issue 2: Biodiversity and Natural Places 
C8.   I would have expected to have seen some discussion of the council’s
Biodiversity Duty Report. The council should consider the implications of this
document in the revised report or as it moves forward to prepare the proposed plan. 
Issue 6: Green Belts 
C9.   As acknowledged in the evidence report, NPF4 expects green belts to be
reviewed as part of the preparation of LDPs. The Local Development Planning
Guidance states that evidence is required to inform detailed green belt boundaries.
The evidence report commits the council to carry out such a review ahead of the
proposed plan. 
C10.   I accept that there may be valid reasons to delay the finalisation of any review
until after the evidence report stage so that it can be considered in parallel with the
development of the spatial strategy, and when the scale of the need for additional
land release is better understood. However, it is disappointing, and a gap in the
evidence, not to see some of the building blocks that will feed into the review more
fully presented in the evidence report. This could have included more work around
new development and development pressures since the last review, the presence of
major businesses and uses, landscape change since the last review, and the
ongoing contribution of different parts of the green belt to the outcomes set out in
NPF4. It is stated that it would have been inappropriate to carry out the review prior
to other pieces of work relating to locality profiling and 20-minute neighbourhoods
being in place, but ideally these exercises would also have been completed in time
to feed in to the evidence report. I advise that work on the green belt review is now
advanced timeously with the involvement of relevant stakeholders.

Page 15

GATE-340-1     15 
C11.   I note that the key for Figure 2 of Issue 6 appears to mix up the notations for
the proposed and adopted green belt. 
Issue 9: Energy, Heating and Cooling 
C12.   The council is yet to identify any Heat Network Zones as required by the Heat
Networks (Scotland) Act 2021. I note that designating such a zone is a key action of
the Local Heat and Energy Efficiency Strategy and a list is provided of potential
zones. However, it would have been preferable for the evidence report to have also
included a clear commitment and a timescale for this work. 
Issue 10: Zero Waste 
C13.   I note the statement at page 6 of Issue 10 that ’recent information on waste
sites and capacities, together with recent data on how household waste is handled
show that sufficient capacity exists’. This information and data does not seem to
have been presented in the evidence report. It is therefore hard to judge the
accuracy of this statement. Possibly the new facility at Glenfarg will provide all the
necessary capacity, but this is not explicitly stated. I advise that these matters are
clarified. 
Issue 13: Blue and Green Infrastructure 
C14.   While Issue 13 highlights the various items of available evidence on this topic,
little strong sense emerges from the evidence report itself of the nature and qualities
of the blue and green network in the area, or of the threats and opportunities
affecting it that could potentially be addressed in the forthcoming plan. The authority
should consider these matters further. 
Issue 14: Play, Recreation and Sport 
C15.   The open space audit and open space strategy will be key evidence sources
for the forthcoming plan that may have a cross-cutting impact across a range of
policy areas. While it is welcome that these exercises are underway and due to
report soon, it is therefore disappointing that they were not ready in time to be
presented in the evidence report where their implications could be considered in the
round. It is to be hoped that these exercises are now either complete or nearing
completion in order to allow their implications to be assessed in the revised evidence
report and in the preparation of the proposed plan. 
Issue 17: Homes 
C16.   I am content that a sound and evidenced explanation has been given for the
selection of the indicative local housing land requirement (ILHLR), the main
elements of this being that:
 the council has systematically addressed the factors that informed the
minimum all-tenure housing land requirement (MATHLR) set out in NPF4, and
found these largely unchanged (but acknowledges the possible need for
further changes ahead of the proposed plan stage, for instance in response to
the release of the results of the 2022 census);
 an adjustment to the data that informed the MATHLR has been made where
justified by improved information on custom/ self-build;

Page 16

GATE-340-1     16 
 other evidence, including the report ‘Existing Housing Need in Perth and
Kinross’, commissioned by Homes for Scotland, has been appropriately
considered; 
 the MATHLR itself was in this case already notably ambitious being based on
growth aspirations beyond the high migration scenario of the Housing Need
and Demand Assessment (HNDA); 
 the HNDA remains current, having been published in November 2022 and
confirmed as being robust and credible by the Scottish Government’s Centre
for Housing Market Analysis in May 2023; and 
 the ILHLR is greater than the MATHLR, as is expected by NPF4, albeit by only
200 houses (2.4%). 
C17.   As regards the increased allowance proposed to be made for custom/ self-
build housing, it does appear that the council has arrived at a more sophisticated
quantification of this segment of demand.  Going forward, it may be advisable for the
council to give further thought, and provide further clarification, as to whether the
increased allowance for households achieving their needs through custom/ self-build
may feed through into marginally lower demand in other segments of the supply. 
C18.   I note that a proportion of the affordable housing supply is anticipated to
comprise buybacks. I agree it may be reasonable to include at least some of these
as additions to the affordable stock, but the council could also give some thought
and consideration to the extent to which this measure would produce a loss of
supply in the market sector. Buybacks would not appear to produce any increase in
the overall housing supply, and this should be acknowledged when considering the
required land supply for the proposed plan. 
C19.   I also note that the Report identifies some gaps in evidence in relation to
housing and commits the council to addressing these ahead of the proposed plan.
These include information around brownfield/ urban capacity, and a more up-to-date
understanding of housing need in the gypsy/ traveller/ travelling showpeople
communities. I advise this work is expedited either to include in the revised evidence
report or to otherwise ensure that it can properly inform the preparation of the plan. 
Issue 21 - Health Care Facilities 
C20.   The Primary Care Premises Strategy 2023-2028 (CD:D21-14) appears to be
useful but to assume that new housebuilding will translate directly into increased
population.  While housebuilding may certainly affect population distribution this
assumption could benefit from further scrutiny. There is also some apparent
uncertainty as to whether existing GP surgeries are at or nearing capacity (page 17
of Issue 21 refers to ‘RAG’ capacity data not being available and that all practices
are routinely accepting new patients). The council will need to carefully consider if
sufficient information is currently available should the emerging LDP seek to justify
the extension of developer contributions to healthcare. 
Issue 26 – Retail, City, Town and Commercial Centres and Issue 29 – Culture and
Creativity 
C21.   The evidence report does a reasonable job of summarising the various
reports and strategies pertinent to these subjects, but is less successful in drawing
on these to provide a straightforward narrative describing the retail and cultural

Page 17

GATE-340-1     17 
characteristics of the area. There is no real overview of the retail pattern across the
council area and the role of different centres beyond Figure 1 illustrating different
tiers of settlement. I acknowledge that much of this information is contained in the
Town Centre Retail Study, but this could have usefully been set out in the report
itself. There is little information on the existence and role of commercial centres
beyond the city and town centres.
C22.   The LDP Guidance suggests authorities should use town centre audits to
inform town centre strategies for each centre. The intention is clearly that the spatial
aspects of these may in turn inform LDPs. The report does not use this terminology,
and while aspects of the Town Centre Retail Study and the Locality Profiling work
may cover this ground, the council should consider the preparation of such audits/
strategies or otherwise satisfy itself that equivalent evidence is in place before
proceeding to prepare the proposed plan.
Issue 27 – Rural Development 
C23.   The evidence report may be being overly pessimistic about the potential for
resettlement of previously inhabited areas, especially given that significant historic
population declines are noted in some areas. The Rural Homes section of NPF4
states that suitable areas should be identified in the spatial strategy. The mixed
success of the previous ‘development zone’ approach is noted, but there may be
other approaches. The fact that some previously settled areas are remote may not
rule out the application of this concept. 
Issue 30 – Minerals 
C24.   Information on this topic was rather sparse. In particular a stronger narrative
and mapping of the spatial distribution of workable mineral resources would have
been helpful. The report acknowledges some ongoing uncertainty regarding the
existence of a 10-year landbank of construction aggregates, and commits to closing
this evidence gap through engagement with the minerals industry. It would have
been preferable for this to have taken place ahead of the evidence report so that the
policy implications of this matter could have been straightforwardly set out. 
Conclusion and Recommendation 
C25.   I do not consider that the matters discussed in this schedule amount to such
insufficiencies as would, on their own, have caused me to return the report.
Nevertheless, I recommend that the authority considers the matters raised and takes
a view as to whether they can be addressed through amendments to the evidence
report, or otherwise in preparatory work ahead of the proposed plan.