Page 1

Ambition | Compassion | Integrity 
Our vision is for 
a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
Council Building
2 High Street
Perth
PH1 5PH 
22/10/2025 
A hybrid meeting of Perth and Kinross Council will be held in the Council Chamber
on Wednesday, 29 October 2025 at 10:00. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members: 
Provost X McDade
Depute Provost A Parrott
All Bailies
All Councillors  
Page 1 of 396

Page 2

Page 2 of 396

Page 3

Perth and Kinross Council 
Wednesday, 29 October 2025 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY FINANCIAL
OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY ITEM ON THIS
AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE OF CONDUCT. 
1 WELCOME AND APOLOGIES   
2 DECLARATIONS OF INTEREST   
3 MINUTES   
3(i)  MINUTE OF MEETING OF PRE-DETERMINATION COMMITTEE
OF 10 SEPTEMBER 2025 FOR APPROVAL
(copy herewith) 
7 - 8 
3(ii)  MINUTE OF MEETING OF PERTH AND KINROSS COUNCIL OF
10 SEPTEMBER 2025 FOR APPROVAL
(copy herewith) 
9 - 14 
4 OUTSTANDING BUSINESS STATEMENT
(copy herewith 25/274) 
15 - 16 
5 PERTH AND KINROSS ANNUAL PERFORMANCE REPORT
2024/25
Report by Strategic Lead - Strategic Planning, People and
Performance (copy herewith 25/275) 
17 - 118 
6 LOCAL CHILD POVERTY ACTION REPORT AND CHILDREN'S
SCORECARD 2025
Report by Strategic Lead - Strategic Planning, People and
Performance (copy herewith 25/276) 
119 - 180 
7 INTEGRATION JOINT BOARD ANNUAL PERFORMANCE
REPORT 2024-25
(copy herewith 25/277)
Council is asked to note the IJB Annual Performance Report which
was approved by the IJB Audit and Performance Committee on 25
August 2025. 
181 - 250 
8 DEMOGRAPHIC AND POPULATION CHANGE : IMPACT ON
SOCIAL CARE 
251 - 288
Page 3 of 396

Page 4

Report by Director Integrated Health and Social Care/Chief Officer
(copy herewith 25/278) 
9 ALEO'S REVIEW (OPTIONS APPRAISAL 2025)
Report by Chief Executive (copy herewith 25/279) 
289 - 390 
10  COMMITTEE TIMETABLE OF MEETINGS 2026/2027
(copies herewith) 
391 - 394 
11  APPOINTMENTS TO COMMITTEES/OUTSIDE BODIES
1. Council is asked to note the updated guide to political balance
on committees (attached).
2. Council is asked to agree that Ian Massie replace Councillor
Grant Laing on the Finance and Resources Committee.
3. Council is asked to agree that Councillor Eric Drysdale be
appointed Vice-Convener on the Finance and Resources
Committee.
4. Council is asked to agree that Councillor Ian Massie replace
Councillor Grant Laing on the Property Sub-Committee.
5. Council is asked to agree that Councillor Tom McEwan be
appointed Convener of the Property Sub-Committee.
6. Council is asked to agree that Councillor Stewart Donaldson be
appointed as Vice-Convener of the Property Sub-Committee.
7. Council is asked to agree that Councillor Ian Massie replace
Councillor Grant Laing on the Economy and Infrastructure
Committee.
8. Council is asked to agree that Councillor ken Harvey replace
Councillor Grant Laing on the Climate Change and Sustainability
Committee.
9. Council is asked to agree that Councillor Eric Drysdale replace
Councillor Grant Laing on the Community Planning Partnership
Board.
10. Council is asked to agree that Councillor Grant Stewart replace
Councillor Grant Laing on Tayside Contracts Joint Committee.
11. Council is asked to agree that Councillor jack Welch replace
Councillor Grant Laing on the Tay Cities Deal Joint Committee.
12. Council is asked to agree that Councillor Tom McEwan replace
Councillor Grant Laing on the COSLA Convention.   
11(i)  POLITICAL BALANCE SEPTEMBER 2025
(copy herewith) 
395 - 396 
12  ELECTED MEMBERS BRIEFING NOTES
Council is asked to note the following Elected Members  Briefing
Notes that have been issued to elected Members since the
previous Council meeting: 
3 September Encampment at Western Edge Park
11 September Update regarding protests over accommodation for
people seeking asylum
12 September Blairgowrie Recreation Centre closure
12 September Pullar House and Kinnoull Street Update 
Page 4 of 396

Page 5

16 September Annual homeless statistics
17 September Material on lampposts
17 September Street weed clearing 2025
22 September Council Leader
23 September Further update on Public Transport Transformation
project
23 September Perth High School closure
24 September Perth High School re-opening information
24 September Treasury Activity and Compliance to 30 June 2025
25 September New Council Leader
26 September Protests over accommodation for people seeking
asylum
1 October Stone of Destiny Exhibition
1 October Health and Social Care Partnership Financial Recovery
Plan 2025/26
2 October Further misinformation about asylum seeker
accommodation
2 October New Council Depute Leaders
3 October GP out of hours service information
3 October Protests over accommodation for people seeking asylum
6 October Braco Primary School
6 October Bus Infrastructure Fund
10 October Protests over accommodation for people seeking
asylum
10 October Christmas Lights Switch-On
10 October North Inch Golf Course Update
14 October EIS Industrial Action Ballot
17 October Protests over accommodation for people seeking
asylum, 18 October 2025 
Page 5 of 396

Page 6

Page 6 of 396

Page 7

PRE-DETERMINATION COMMITTEE 
Minute of hybrid meeting of the Pre-Determination Committee held in the Council
Chambers on Wednesday 10 September 2025 at 9.30am. 
Present: Provost X McDade, Depute Provost Parrott, Bailies A Bailey, R Brock, C
McLaren and M Williamson; Councillors K Allan, H Anderson, L Barrett, P Barrett,
B Brawn, S Carr, A Chan, D Cuthbert, S Donaldson, E Drysdale, J Duff, A Forbes,
M Frampton, N Freshwater, K Harvey, D Illingworth, I James, N Khogali, G Laing, I
MacPherson, C Mair, I Massie, S McCole, T McEwan, J Rebbeck, W Robertson, C
Shiers, F Smith, C Stewart, G Stewart, A Watt, R Watters and J Welch. 
In Attendance: T Glen, Chief Executive; C Mailer, Depute Chief Executive; S
Merone, Strategic Lead – Economy, Development and Planning; K Smith, S Panton,
A Gudgeon, N Sworowski (all Economy, Development and Planning); G Fogg, S
Hendry, A Brown and M Pasternak (all Legal and Governance). 
Apology for Absence: Bailie C Ahern 
Provost McDade, Presiding 
1. Welcome and Apologies 
The Provost welcomed everyone present to the meeting and an apology was
noted as above. 
2. Declarations of Interest 
In terms of the Councillors’ Code of Conduct, Councillor F Smith declared a
non-financial interest in item 3 on the agenda. 
A1. Request for Deputations 
Members agreed to the deputation requests in relation to item 3 on the agenda. 
COUNCILLOR SMITH LEFT THE MEETING AT THIS POINT 
3. Reconfiguration of existing golf course and club house from 18 holes to
9 holes, and a community hub building and associated sports courts and bike
trails, walking and cycling paths and car parking area, erection of up to 175
residential dwellings, open/amenity space, landscaping, drainage, upgraded
site access and associated works at Craigie Hill Golf Club, Pickembere, Perth 
Kristian Smith, Development Management and Building Standards Services
Manager introduced the report and delivered a slide-based presentation. 
3(i)
Page 7 of 396

Page 8

Ms Janice Haig and Mr Malcolm MacConnachie, objectors, addressed the
committee and answered Members’ questions. 
Mr Derek Ross and Mr Athole McDonald, agents, and David Mitchell, Jamie
Hall, Alan Cargill, supporters, addressed the committee and answered members
questions. 
There followed a recess and the meeting re-convened at 11.30am. 
Members asked a number of questions to officers on the contents of the report. 
The Committee, noting that the application would be determined at the meeting of
Council to be held immediately following this meeting, concluded its business. 
Page 8 of 396

Page 9

Perth and Kinross Council 
Minute of hybrid meeting of Perth and Kinross Council held in the Council Chamber,
2 High Street, Perth on Wednesday 10 September 2025 at 12.20pm 
Present: Provost X McDade, Depute Provost A Parrott, Bailies B Bailey, R Brock, C
McLaren and M Williamson; Councillors K Allan, H Anderson (up to Item 6), L
Barrett, P Barrett, B Brawn, S Carr, A Chan, D Cuthbert, S Donaldson, E Drysdale, J
Duff, A Forbes, M Frampton, N Freshwater, K Harvey, D Illingworth, I James,
G Laing, I MacPherson, C Mair, I Massie, S McCole, T McEwan, J Rebbeck,
W Robertson, C Shiers, F Smith, C Stewart, G Stewart, A Watt, R Watters and
J Welch. 
In Attendance: T Glen, Chief Executive; C Mailer, Depute Chief Executive; S
Merone, Strategic Lead – Economy, Development and Planning; S MacDonald, A
Farnington, S Crawford, Strategic Lead – Property Services; J Beveridge (all
Property Services) G Fogg, S Hendry, A Brown and M Pasternak (all Legal and
Governance), 
Apologies for Absence: Bailie C Ahern and Councillor N Khogali. 
Provost X McDade, Presiding 
1. Welcome and Apologies 
Provost McDade welcomed all those present to the meeting and apologies
were noted as above. 
2.  Declarations of Interest 
In terms of the Councillors’ Code of Conduct, Councillor F Smith declared a
non-financial interest in item 5, and Councillor S Donaldson declared a non-financial
interest in item 6 on the agenda. 
3. Minute of Meeting of Perth and Kinross Council of 18 June 2025 for
Approval 
The minute of the meeting of Perth and Kinross Council of 18 June 2025 was
submitted and approved as a correct record. 
4. Outstanding Business Statement 
The Outstanding Business Statement was noted and it was agreed to remove
the completed actions.
3(ii)
Page 9 of 396

Page 10

5. Reconfiguration of existing golf course and club house from 18 holes to
9 holes, and a community hub building and associated sports courts and bike
trails, walking and cycling paths and car parking area, erection of up to 175
residential dwellings, open/amenity space, landscaping, drainage, upgraded
site access and associated works at Craigie Hill Golf Club, Pickembere, Perth 
Motion by Bailie A Bailey and Councillor H Anderson
I move for approval subject to the following being addressed by manner of
conditions:
• Transport planning concern about interaction with new supermarket
• Access arrangements in case of flooding on local road network
When such conditions are considered alongside the significant wider benefits
of this development, including; the provision of affordable and accessible
housing units within the core of Perth City, its conformity with 20 minute
neighbourhood policy, and the long-term security of a popular sports club, it is
considered by council there is sufficient justification and net gain to permit the
development, contrary to the provisions of the adopted development plan. 
Amendment by Councillors I Massie and G Stewart 
To support the recommendations of the Strategic Lead – Economy,
Development and Planning in Report 25/221 and to refuse the application. 
(There followed a short recess and the meeting reconvened at 12.50pm) 
The Mover and Seconder of the Motion agreed to incorporate an additional
condition:
• to delegate to officers authority to draft and impose appropriate planning
conditions for an in-principle application of this nature together with the
requirement for, if appropriate, to require the applicant enters into a
section 75 agreement. 
In terms of Standing Order 21., a roll call vote was taken: 
9 Members voted for the Motion as follows:
Depute Provost A Parrott, Bailie A Bailey, Councillors K Allan, H Anderson, A Chan,
J Duff, A Forbes, T McEwan and A Watt. 
26 Members voted for the Amendment as follows:
Provost X McDade, Bailies R Brock, C McLaren and M Williamson, Councillors L
Barrett, P Barrett, B Brawn, S Carr, D Cuthbert, S Donaldson, E Drysdale, N
Freshwater, K Harvey, D Illingworth, I James, G Laing, I Macpherson, C Mair, I
Massie, S McCole, W Roberston, C Shiers, C Stewart, G Stewart, R Watters and J
Welch. 
Page 10 of 396

Page 11

2 Members abstained as follows:
Councillors M Frampton and J Rebbeck. 
Resolved: 
In accordance with the Amendment. 
(There followed a recess and the meeting reconvened at 2.15pm.) 
COUNCILLOR ANDERSON LEFT THE MEETING AT THIS POINT. 
6. Tay Cities Regional Deal Programme – Update on PK Projects 
There was submitted a report by Strategic Lead – Economy, Development
and Planning (25/223) providing an update on the process of Reshaping the Tay
Cities Deal (TCD). Projects in Perth and Kinross could either be confirmed for
delivery within the timescales of the Deal or replaced by alternatives projects by
February 2026. 
Resolved:
(i) The contents of the report be noted.
(ii) It be agreed that the Strategic Lead – Economy, Development and
Planning to provide a further update on the progress at a future
meeting. 
COUNCILLORS M FRAMPTON, K ALLAN AND P BARRETT ALL LEFT THE
MEETING DURING CONSIDERATION OF THE FOLLOWING ITEM. 
7. Perth City Centre Development & Design Framework Review Update 
There was submitted a report by Strategic Lead – Economy, Development
and Planning (25/224) providing an update on the Perth City Centre Development &
Design Framework, originally presented in September 2024 (Report No. 24/241),
outlining: progress since the Council’s approval to consult on the Framework,
summary of feedback from engagement and public consultation, proposals being
advanced or prepared for next-stage development, a pipeline of projects ready for
progression when funding becomes available. 
Motion by Councillors G Laing and E Drysdale 
To approve the recommendations in Report 25/224. 
Page 11 of 396

Page 12

Amendment by Bailie A Bailey and Depute Provost A Parrott  
• Council agrees Recommendations 2.1, 2.2 and 2.3.
• However, Council additionally notes its concern that a once in a lifetime
opportunity to truly integrate bus and rail transport in our city is being
missed due to Network Rail's timescales not matching Council's own
funding timescales.
• Further it notes that the land currently occupied by carriage sidings, but
previously earmarked for the bus station, will now become surplus to
railway use in 5 years based on the Cabinet Secretary's recent
announcement that Fife and Borders electrification is to proceed.
• Therefore, council additionally requests that officers continue to partner
with Transport Scotland and Network Rail to ensure that if the
opportunity arises prior to detail design, the bus station can be fully
integrated within the footprint of the railway station. 
The Mover and Seconder of the Motion agreed to incorporate the Amendment into
the Motion. 
Resolved:
In accordance with the revised Motion. 
8. UK City Net Zero Partnership Declaration 
There was submitted a report by Strategic Lead – Economy, Development
and Planning (25/225) asking Perth and Kinross Council to sign the UK City Net Zero
Partnership Declaration and become a part of a new vanguard of places committed
to collective efforts for achieving carbon reduction savings in partnership with the
private sector. The Declaration will be used as a platform to promote Perth and
Kinross to investors. 
Resolved:
(i) To agree to sign the UK City Net Zero Partnership Declaration and
become a member of the group of local authorities supporting the
declaration. 
(ii) To agree that Strategic Lead – Economy, Development and Planning
provides a further update on the progress at a future meeting of a
relevant committee. 
Note:  In terms of Standing Order 22.1, Councillors I James and F Smith
requested that their dissent to the decision be recorded. 
9. Committee Timetable of Meetings 2026/2027 
It be agreed that the Timetable of Meetings 2026/2027 be deferred to the next
meeting of Perth and Kinross Council on 29 October 2025. 
Page 12 of 396

Page 13

10. Appointments to Committees/Outside Bodies 
Resolved:
1. The updated guide to political balance on committees be noted.
2. Councillor Andy Chan be replaced by Councillor Bob Brawn on the Audit and 
Committee.
3. Councillor Bob Brawn be appointed Vice-Convener of the Audit and Risk
Committee.
4. Councillor Andy Chan be replaced by Councillor Keith Allan on the Finance
and Resources Committee.
5. Councillor Andy Chan be replaced by Councillor Neil Freshwater on the
Licensing Committee.
6. Councillor Andy Chan be replaced by Councillor John Duff on the Property
Sub-Committee.
7. Councillors Colin Stewart (Vice-Chair), Michelle Frampton, David Illingworth
and Sheila McCole be re-appointed to the Perth and Kinross Integration Joint
Board. 
11. Senior Councillor Remuneration 
Resolved: 
The change to Senior Councillor remuneration as set out on the agenda be
agreed. 
12. Elected Members Briefing Notes 
The Elected Members Briefing Notes, issued since the previous Council
meeting and as set out on the agenda, be noted. 
13. Statement by Council Leader on Pullar House 
Councillor G Laing provided an update on the Council’s decision to purchase
Pullar House and the adjoining Kinnoull Street multi-storey car park, following the
resolution passed on 4 September 2024. The acquisition, effective from 11
September 2025 is part of the Perth City Integrated Investment Proposal and is
expected to generate annual savings of £1.8 million. Pullar House will host co-
located public sector agencies, enhancing collaboration and helping cover revenue
and capital costs. Seven employees from Smart Parking and Robertsons will transfer
to the Council as part of the car park’s operational transition. Final purchase details
are being completed, with full update to be presented at the Finance and Resources
Committee on 1 October 2025. 
Page 13 of 396

Page 14

14. Valedictory – Stephen Crawford, Strategic Lead – Property Services 
The Provost, Bailie A Bailey, and Councillors G Laing, J Duff and L Barrett passed
on their best wishes on behalf of all elected members to Stephen Crawford ,
Strategic Lead – Property Services who was retiring from the Council at the end of
September following working for a number of years with the Council. 
Page 14 of 396

Page 15

PERTH AND KINROSS COUNCIL 
OUTSTANDING BUSINESS STATEMENT (OBS) 
(Report No. 25/274) 
Please note that this statement sets out outstanding decisions of Council / this committee / sub-committee along with an update and estimated
completion date.  Actions which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then
agreement will be sought to its removal from the OBS. 
No  Date / Minute
Reference /
Report Number
Subject Title Outstanding Action Update  Lead Officer
/Service
Action Due/
completed
Action
Expected
29. 10 September
2025.  Agenda
Item 7.
Communication to
Network Rail.
Joint letter to be
issued on behalf of all
political groups to
Network Rail
regarding investment
in Perth Railway
Station. 
Letter to be issued in
October. 
Members’
Support
COMPLETED October
2025
4
Page 15 of 396

Page 16

Page 16 of 396

Page 17

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality
___________________________________________________________________  
Committee: Perth and Kinross Council 
Date of Meeting: 29 October 2025 
Report Title: Perth and Kinross Council Annual Performance
Report 2024/25 
Report Number: 25/275 
Report Author: Carole Hendry, Service Manager – Strategic Planning
and Performance 
Organisational Lead: Greg Boland, Strategic Lead – Strategic Planning,
People and Performance
___________________________________________________________________ 
1. Purpose 
1.1 The Annual Performance Report (APR) is part of the Council’s strategic
planning and performance framework, supporting delivery of its vision and
achievement of outcomes. It provides an overview of how the Council has
performed against its priorities, actions and associated key performance
indicators in the period from April 2024 to March 2025, as set out within the
Corporate Plan 2022-2027.   
1.2 This report is structured as follows:- 
1. Purpose
2. Recommendations
3. Background
4. Summary Information 
5. Impact Value Assessment
6. Appendices 
2. Recommendations 
It is recommended that the Council:- 
2.1 approves the Annual Performance Report for 2024/25. 
2.2 agrees the amendments/deletions of Key Performance Indicators (KPIs),
outlined in paragraph 4.3 (Table 1), for future Annual Performance Reports.
5
Page 17 of 396

Page 18

2.3 agrees the proposed reporting arrangements for the Corporate Delivery and
Improvement Plan and Annual Performance Report outlined in paragraph 4.8. 
3. Background 
3.1 Perth and Kinross Council’s Annual Performance Report (APR) is a statement
of the progress made towards achieving its strategic priorities and meeting its
statutory duty to deliver best value during the financial year 2024/25. It
provides elected members, officers and the public with an understanding of
the performance achieved through qualitative narrative as well as details on
indicators and areas for improvement. In addition, an Executive Summary is
attached at Appendix 2 which provides an overview of Key Performance
Measures (KPI) trends for each strategic priority and a short narrative to
explain performance. This shorter version will help support the Council’s
public performance reporting activity on the website and via social media. 
3.2 To support the APR, as with previous years, supplementary information is
online on the website PK Performs, including case studies which give
illustrative examples of progress towards the Council’s vision of a Perth and
Kinross where everyone can live life well, free from poverty and inequalities.   
3.3 A draft of the APR was considered by the Scrutiny and Performance
Committee on 17 September 2025 (Report 25/230). This allowed the
Committee to scrutinise the report and provide feedback which has been
incorporated into the APR appended to this report. 
4 Summary Information 
4.1 The Council’s APR for 2024/25 is a high-level summary of the impact that
Council services collectively had in the period 1 April 2024 to 31 March 2025.
It provides a summary of trends in data against each of the indicators,
however, these should be considered in the context of the current operating
environment, challenges and whether we control, influence or are informed by
the data. 
4.2 Within the APR performance is reported against the Council’s seven key
priorities and associated actions identified within the Corporate Plan. Detailed
information and data is provided on Key Performance Indicators (KPIs),
performance and improvement. 
4.3 To ensure KPIs remain relevant, some changes have been identified, as
outlined in Table 1 below. Council is asked to approve these changes for the
2025/26 Annual Performance Report. 
Page 18 of 396

Page 19

KPI Title Priority Change Reason
Number of
employers
signed up as
Living Wage
employers in
Perth &
Kinross
Tackling
Poverty
Removal This KPI only includes those who
have paid for Living Wage Foundation
accreditation, whilst officers are
aware that many more employers
who pay the real Living Wage are not
accredited. Another existing KPI
(Percentage of people earning less
than the real Living Wage) is more
relevant.
Renewable
energy
generated
across the
PKC estate,
including from
low carbon
heat sources
(MWh)  
Developing
a resilient,
stronger
and greener
local
economy
Split into two
KPIs - one to
reflect
generation of
renewable
energy; and
one to reflect
low carbon
heat source
technology
The current KPI combines two distinct
categories of energy generation: 
renewable and low carbon (see
distinction below). While both
contribute to decarbonisation, they
differ in source, sustainability, and
operational control. 
• Renewable energy (e.g. solar PV
solar water heating, hydro, wind) is
typically zero-emission at the point of
use and often directly managed by
the Council.
• Low carbon heat sources (e.g.
biomass boilers, heat pumps) may
still produce emissions or rely on
external management, making their
performance and impact different.
Two of the largest low carbon heat
sources in the estate are not directly
managed/maintained by the Council
and including their output in a
combined KPI can obscure the
Council’s direct contribution to
renewable generation.
Splitting this KPI will assist in
demonstrating progress against each
energy source and bring us in line
with Scottish Government policy and
reporting frameworks which
increasingly distinguish
between renewable and low
carbon technologies. 
Page 19 of 396

Page 20

KPI Title Priority Change Reason
Total number
of homes built
in rural areas
of Perth and
Kinross
Working in
partnership
with
communitie
s
Title change -
Number of
new
affordable
homes in rural
areas,
including new
build and buy
backs
The wording of the indicator should
be changed to remove explicit
reference to new build and include
other delivery types, such as
buybacks, as this more accurately
reflects the scale of new supply rural
housing that is described in the Key
Action Summary (Increase the supply
and availability of rural housing). This
ensures a more accurate measuring
of the KPI and reflects reporting
elsewhere.
Table 1 
4.4 Throughout the APR, there are examples of how services have continued to
have a positive impact on outcomes for individuals, businesses and
communities. The Executive Summary provides an overview of how this has
been achieved.   
4.5 Despite these achievements the Council are not complacent and recognise
the many challenges we faced within 2024/25, and those that lie ahead. The
report recognises some of these challenges and the work that we are doing to
make positive change. 
4.6 In May 2024, the Corporate Delivery and Improvement Plan (CDIP) was
approved (Report 24/148). A progress update on the improvement actions
within the CDIP is shown at Appendix 3. In addition, included under each of
the corporate priorities within the APR we have outlined key areas of focus for
2025/26.   
4.7 The current Corporate Plan will require to be updated in 2027 and offers the
opportunity begin the process of reviewing the current Council priorities,
aligning both local and national needs as well as undertaking wider
engagement with our partners, community groups and more generally with the
wider Perth and Kinross population.  The planning and engagement for this
will commence in the latter part of 2025 and beyond. 
4.8 As a result, it is proposed that we continue to provide updates to the existing
CDIP actions, with any areas of focus for the following year identified within
the APR.  We will also consider further how we report on the current
Corporate Plan for 2025/26 and 2026/27 with a view to streamlining the APR
process.   
5. Impact Value Assessment 
This report has been classified as being an operational report and as such
does not require a full Impact and Value Assessment. 
Page 20 of 396

Page 21

6. Appendices 
6.1 Perth and Kinross Council Annual Performance Report 2024/25 
6.2 Annual Performance Report 2024/25 Executive Summary 
6.3 Key Improvement Activities from CDIP 2024-25 
Page 21 of 396

Page 22

Page 22 of 396

Page 23

ANNUAL PERFORMANCE REPORT 2024/25 
PKC - GENERAL
Appendix 1 
5
Page 23 of 396

Page 24

Annual Performance Report 2024/25
1
PKC - GENERAL  
Contents
Contents 
Introduction 2
Performance summary 3
Priority: Tackling poverty 4
Priority: Tackling climate change and supporting greener sustainable places 11
Priority: Developing a resilient, stronger and greener local economy 19
Priority: Enabling our children and young people to achieve their full potential 268
Priority: Protecting and caring for our most vulnerable people 37
Priority: Supporting and promoting physical and mental wellbeing 45
Priority: Working in partnership with communities 52
Key contact 59
Page 24 of 396

Page 25

Annual Performance Report 2024/25
2
PKC - GENERAL
Introduction
Welcome to our Annual Performance Report for 2024/25.
This report provides an overview of the work undertaken by Perth
and Kinross Council over the past year. It reflects the dedication of
our teams, the strength of our partnerships, and the resilience of
our communities in the face of ongoing challenges.
Our vision remains clear: 
a Perth and Kinross where everyone can live life well, free from
poverty and inequality. 
Delivering on this ambition requires us to focus our efforts where
they are needed most - supporting those in greatest need,
protecting our most vulnerable residents, and creating the
conditions for a thriving local economy.
In 2024/25, we continued to invest in targeted support for families
and individuals experiencing poverty, expanded opportunities for
fair work and employability, and strengthened our approach to care
and protection. At the same time, we have worked to deliver
services more efficiently, making the best use of the resources
available to us in a climate of increasing financial pressure.
This report is structured around the Council’s seven strategic
priorities and includes performance data, case studies, and links to
further information. It also reflects on areas where improvement is
needed and outlines how we are responding to emerging
challenges and opportunities.
We are proud of the progress made this year and grateful to
everyone who has contributed - including Council officers, elected
members, partners, businesses, and community and voluntary
groups. We hope this report provides a clear account of our
performance and our ongoing commitment to delivering high-quality
public services for the people of Perth and Kinross.     
Councillor Eric Drysdale   Thomas Glen
Council Leader    Chief Executive  
Page 25 of 396

Page 26

3 
PKC - GENERAL
Performance summary 
Performance against priorities and actions 
The following pages highlight just some of the work we have
undertaken with our communities and partners across the private,
public and third sectors throughout the year. This is listed by priority
area as outlined within our Corporate Plan 2022/23-2027/28.
Case Studies
Each priority area contains a short summary of relevant case
studies, which can be viewed on PK Performs website.
Key Performance Indicators
Each priority area also includes Key Performance Indicator (KPI)
data with an indication of change over the last year and
accompanying commentary. Data is shown between 2021/22 –
2024/25, or the most recent year available.   
Caution should be applied when interpreting KPI data, as these are
only indicative of performance. Changes in performance should be
considered in the context of the current operating environment,
challenges and whether we control, influence or are informed by the
services which are reflected in the data. It is also important to note
that the APR covers the period from April 2024 to March 2025. Data
and evidence is collected from various sources, which can have
different reporting timescales out-with the Council’s control, and
therefore some data is reported in arrears, or some is not available
until later in the year. 
Targets
Targets for each KPI are also presented where relevant and
highlighted by a traffic light system as to whether the 2024/25
performance has met the target.
KPI Overview
KPI Annual Change
Change since
last reporting
year is
favourable
Change since last
reporting year is
unfavourable
Change
since last
reporting
year is static
No data
available to
make
comparison 
   N/A
33 12 5 4
KPI performance against target
Met or
exceeded
target 
Target
not met  Target
Not Set 
24/25
Target Set
but data not
yet available
Not appropriate
to set target
18 18 7 3 8
Supporting information
Best Value themes
In addition to reporting on performance against the actions and
indicators set out within our Corporate Plan and in line with the
statutory performance information direction, we have created a
supplementary report on our performance aligned to the Best Value
themes. Read the Best Value Themes Performance Report 2024/25
on our PK Performs website.
Financial information 
We have also included financial information online which details
where we get our money from and how that budget is used. Read
the supporting financial information on our PK Performs website.
Page 26 of 396

Page 27

4 
PKC - GENERAL
Priority: Tackling poverty 
Action: Prevent and mitigate the impacts of poverty
for children living in Perth and Kinross 
Perth and Kinross has made encouraging progress in reducing child
poverty. The local rate is now 3.8% below the national average,
nearly double the previous gap of 2%. This improvement has
improved the area’s ranking to 7th nationally for lowest child poverty
rates. While these results are promising, data will be closely
monitored over the next two years to ensure the improvement is
sustained. 
Key activities contributing to this in 2024/25 are included below
and detailed further in the Children’s Scorecard 2024/25:
• A network of public, third sector, and community organisations
collaborated to deliver holistic family support, focusing on
employability, income maximisation, and wellbeing.
• Strategic efforts across all partner organisations supported
parents into work by providing access to affordable housing,
transport, childcare and employability support. 
• The Support and Connect programme trained frontline workers
to deliver wraparound support, helping families transition from
crisis support to sustainable livelihoods.
• The Children’s Scorecard tracked service responsiveness to
people with lived experience of poverty and monitored progress
against child poverty reduction targets.
• Through the Future for Families project we: engaged with 238
families, including 199 new families; supported 45 parents into
self-employment; and provided digital devices to 98 families
experiencing digital poverty.
• We helped remove barriers to employment for parents by
providing 3,229 childcare places across the public and private
sectors and funding 300 Strong Start places for 2-year-olds.
• We allocated over £82,500 to support holiday food for school
children and 70 children benefited from free places at the
Fuelled for Fun holiday programme.
• Despite increased demand for temporary accommodation due
to the housing crisis, our ‘Home First’ approach helped maintain
stability in terms of families being in temporary accommodation.
Between 2020 and 2024, the number of households in
temporary accommodation remained stable, with 6 households
(15 children) in March 2025 compared to 8 households (16
children) in March 2024 – reducing disruption for families which
is critical for child development and wellbeing. In the same
period the national figure rose by 36%. 
CASE STUDY
The Family Advice and Community Connections
Service was commissioned from Aberlour and launched in
September 2024 using Whole Family Wellbeing Fund
funding. It provides flexible, early help to families across
Perth and Kinross, allowing them to access support directly
without professional referral. 
Action: Mitigate cost of living pressures for
households experiencing or at risk of poverty 
We have taken a targeted, person-centred approach to easing cost-
of-living pressures for households in or at risk of poverty. Through
financial support, early intervention, and strong engagement, we
have helped residents maintain stable housing and improve their
financial wellbeing. Key activities contributing to this include:
• In 2024/25, 564 tenants received £203,000 in financial
assistance through our Tenancy Sustainment Fund (TSF),
helping them manage arrears and maintain stable housing. The
Page 27 of 396

Page 28

5 
PKC - GENERAL
fund uses a flexible, person-centred approach to ensure support
reaches those who need it the most.
• Our rent collection strategy continues to deliver exceptional
results, achieving an in-year collection rate of 100.17% in
2024/25, up from 99.15% the previous year. This result,
supported by a 53-week rent year, reflects the success of our
tenant-focused approach that balances financial rigour with
personalised support. Key enablers of this success include:
• Digital Inclusion Project: provided devices, data, and
training to tenants to improve digital access.
• Centralised Arrears Team: took a proactive approach to
early intervention and tailored support to prevent arrears
increasing.
• Tenant engagement: over 6,700 support calls handled,
strengthening responsiveness when they need it.
• Rent arrears reduced significantly, highlighting the effectiveness
of our integrated support model
• current arrears fell from 9.59% to 8.03%
• gross arrears dropped from 10.98% to 8.83%. 
• The Financial Inclusion Project, in partnership with Citizens’
Advice Bureau, delivered:
• £784,052 in financial gains for tenants.
• Support for 677 tenants in arrears 
Action: Maximise income from benefit entitlement
and concessions for households experiencing or at
risk of poverty
In 2024/25, we strengthened our efforts to help residents increase
their income through benefits and financial support. By focusing on
outreach, targeted funding, and inclusive service delivery, the
Council ensured that support reached those most in need -
particularly in rural areas and among vulnerable groups.
Recognition at a national level highlighted the impact of this work,
which continues to evolve through strong partnerships and
community engagement. Key activities contributing to this in
2024/25 include:
• £9.2 million in additional benefits secured for Perth and Kinross
residents by our Welfare Rights service in 2024/25. This
represents an 8% increase in financial outcomes from 2023/24,
reflecting improved service promotion, follow up and tracking
processes.
• £269,000 distributed through the Financial Insecurity Fund to
over 1,400 households, including those without recourse to
public funds. Despite reduced funding and fewer applications,
over 66% of payments were directed to rural households facing
financial hardship.
• In October 2024, our Welfare Rights and Welfare Fund teams
won the Institute of Revenues, Rating and Valuation’s
Excellence in Social Inclusion Performance Award for Scotland,
recognising their impactful work in prisons and foodbanks
across urban and rural communities.
• We strengthened access to Welfare Rights and Welfare Fund
services by reducing barriers and increasing awareness in
targeted communities. Key examples include:  
• Beginning regular outreach at Double Dykes and partnering
with Broke Not Broken to support Gypsy/Traveller
communities in Kinross. This improved engagement, built
trust, and strengthened relationships, with officers now
being accepted and welcomed into the communities.
• Delivering a six-month outreach programme at @Scott
Street .This led to improved referral rates and stronger
partnerships, enabling Social Work teams to move to online
referrals and increasing client engagement to ensure full
entitlements are obtained.
• Partnering with YMCA, Creative Exchange, and others to
enhance welfare rights support for young people aged 16–
Page 28 of 396

Page 29

6 
PKC - GENERAL
25, ensuring tailored assistance for this age group. This is
the first time that young people have been specifically
targeted with this type of support in Perth and Kinross.
• Establishing a weekly Welfare Fund outreach service in
HMP Perth in collaboration with the Scottish Prison Service.
This supported over 90 prisoners preparing to reintegrate
into the community, helping them access entitlements and
stabilise their transition.   
CASE STUDY
Provision of Welfare Rights Outreach in Prison – This
case study highlights our efforts to ensure provision of
financial support for prisoners and their families, to improve
the transition from prison to community for individuals due to
be released. We are the first and only local authority in
Scotland to provide this outreach service. 
Action: Promote and encourage local employers to
follow the principles of the Scottish Government
Fair Work Action Plan, including the real Living
Wage and Scottish Business Pledge
We continue to champion the Scottish Government’s Fair Work
Action Plan by embedding fair work practices across our own
operations and encouraging local employers to do the same. Our
focus remains on ensuring fair pay, inclusive recruitment, and
meaningful support for businesses committed to the Real Living
Wage and the Scottish Business Pledge. Key activities contributing
to this in 2024/25 include:
• Ensuring that all businesses receiving Council grant funding paid
the living wage to their employees
• Supporting local employers to recruit through targeted incentives
where roles pay the Real Living Wage.
• Paying the Real Living Wage to all our employees, including
apprentices
• Through our Futures for All Employer Recruitment Incentive
(ERI), we provided financial and employability support to 48
businesses – 20 in Perth and 28 in rural areas.  All participating
employers paid the living wage to new recruits (except
apprentices), with a focus on helping individuals facing barriers
to employment to access fair work opportunities.
• Further developing our Customer Relation Management (CRM)
system to improve our intelligence and develop enhanced
engagement with our Top 100 businesses. 
Areas of Focus
• Better understand and capture the value of preventative spend
and how funds are allocated to develop a budgeting approach
based on identified need and overall wellbeing 
• Review actions contributing to ongoing reduction in child poverty
levels to identify and enhance the most effective interventions. 
• Expand Fast Online Referral Tracking system referral pathways
and deliver Support and Connect training to frontline staff and
partners to provide a more consistent and comprehensive
support service 
Links to other Performance Information
➢ Child poverty action in Perth and Kinross – Perth & Kinross
Council (pkc.gov.uk) 
Page 29 of 396

Page 30

7 
PKC - GENERAL
Key Performance Indicators related to this priority:     
Data will be indicative of performance and should be considered in the context of the current operating environment and level of influence.
Key Actions
(summary)
Indicator Control /
Influence
Performance Comments
20/21 21/22 22/23 23/24 24/25 Annual
Change Target Target
Met/
Not Met 
Prevent and
mitigate the
impacts of
poverty for
children 
Percentage
of children
living in
poverty after
housing
costs in
P&K 
Inform 18.7%
(note,
viewed as
an outlier
due to
small
sample
as a
result of
COVID)
21.9% 21.7% 19.2% N/A

10% by
2030
(SG
Target)
N/A  2024/25 information will not be published
until June 2026; commentary is based on
the most recent data published. All figures
are based on estimates using Scottish
Government (SG) data. 
Perth and Kinross continue to outperform
the national average in tackling child
poverty. This local rate has fallen
from 21.7% to 19.2%, compared to the
Scottish average of 23%. This 1.5%
reduction has widened the gap between
Perth and Kinross and the national average
to 3.8%, nearly double what it was
previously. 
This improvement may be linked to:
• Perth and Kinross recording the second
highest growth in affordable housing
per 1,000 residents between 2018-2024
• Local authority and private sector rental
charges remaining below the national
average
• Strong performance in promoting and
delivering Best Start and Crisis Grants 
While these figures are encouraging,
continued monitoring over the next two
Page 30 of 396

Page 31

8 
PKC - GENERAL
Key Actions
(summary)
Indicator Control /
Influence
Performance Comments
20/21 21/22 22/23 23/24 24/25 Annual
Change Target Target
Met/
Not Met 
years will be essential to confirm whether
this represents a sustained improvement. 
We will continue to prioritise areas where we
are performing less well against the national
average, such as free school meal uptake
and child poverty in urban wards.
Mitigate
cost of
living
pressure
for
households
experiencin
g and at
risk of
poverty 
Number of
P&K
households
provided with
energy
efficiency
and/or low
carbon
heating
advice (PKC
funded)
Influence 545 256 884 2,205 1,638 500    Advice was provided to a total of 1638 via
the Scarf energy advice programme as a
result of both the Housing and Climate
Change funding streams.
Whilst there has been a decline in the
number of households supported in 24/25,
this is due to this measure only capturing
advice services funded by the Council.
Figures for 23/24 included the Heat Project,
which continues to support residents but is
now funded elsewhere. This year we are
taking a more targeted approach which may
result in a further reduction in the number of
households being provided with advice, but
which could lead to more impact within
Perth and Kinross.
Number of
new affordable
homes,
including new
build and buy
backs
Control 124
(100 new
build, 
24 buy
backs)
308
(276 new
build, 
32 buy
backs)
203
(167 new
build, 
36 buy
backs)
173
(105 new
build, 
48 buy
backs, 
20 empty
homes)
264
(37 new
builds, 116
buy backs,
23 empty
home and 18
acquisitions*)
  
210    In 2024/25, 264 new affordable homes were
completed across Perth and Kinross by us
and our Registered Social Landlord
partners. Of these, we delivered 37 new
build properties and purchased 116 as
buybacks. The Local Housing Strategy sets
a yearly target of 210 new affordable homes
a year, based on assessed housing need
and demand. While this is shown as an
annual target, delivery is over a 5-year
Page 31 of 396

Page 32

9 
PKC - GENERAL
Key Actions
(summary)
Indicator Control /
Influence
Performance Comments
20/21 21/22 22/23 23/24 24/25 Annual
Change Target Target
Met/
Not Met 
strategy as annual delivery may vary due to
the nature of new housing development. To
maintain progress while our new-build
programme is being established, the
decision was taken to exceed the standard
buyback target of 40 homes. This approach
has helped ensure a steady supply of
council housing during a period of transition.
We also acquired 18 homes from the
National Trust of Scotland. 
Maximise
income from
benefits and
concessions
Number of
Scottish
Welfare Fund
Crisis Grant
applications
Influence 6,336 5,498 6,539 7,421 7,856

N/A
(not
appropriate
to set
targets) 
N/A Since June 2023, first point of contact calls
have been re-routed directly to the Welfare
Rights team. This change has led to an
increase in applications, driven by improved
access to specialist advice, a rights-based
approach to crisis support, and external
pressures such as Universal Credit (UC)
Managed Migration; UC deductions and the
ongoing cost of living crisis. 
The new call handling process ensures
queries are managed end-to-end by trained
advisors, providing accurate and timely
support from the outset.
In 2024/25, over 100% of the Scottish
Government allocation of £653,000 for the
Scottish Welfare Fund was spent on Crisis
Grants. Additional local funding was used to
meet the remaining demand for Crisis
Grants and to fully fund Community Care
Grant awards. Of the 7,856 applications
received, 5,118 awards were made. 
Page 32 of 396

Page 33

10 
PKC - GENERAL 
Key Actions
(summary)
Indicator Control /
Influence
Performance Comments
20/21 21/22 22/23 23/24 24/25 Annual
Change Target Target
Met/
Not Met 
Total amount
of benefit
income gained
as a direct
result of
involvement
from the
Welfare Rights
Team
Influence £5.5m £5.3m £6.5m £8.5m £9.2m

N/A
(not
appropriate
to set
targets)
N/A In 2024/25, the Welfare Rights service
helped Perth and Kinross residents gain an
additional £9.2 million in benefits – an
increase of 8% compared to 2023/24. The
service received 8,109 referrals, with 6,315
of these being new clients. This rise in
referrals reflects targeted efforts to promote
the service and maintain contact with
customers, enabling better tracking of
outcomes.
Promote and
encourage
principles of
the Scottish
Government
Fair Work
Action Plan
Number of
employers
signed up as
Living Wage
employers in
Perth &
Kinross
Influence N/A New
Indicator
91 97 100 102 

110    This figure shows a slight increase on last
year, whilst not meeting the increased
target. This KPI does not show the full
picture of employers who pay the real Living
Wage in Perth & Kinross. The figures are
only inclusive of those subscribed to the
Living Wage Foundation Pledge scheme,
where accreditation is paid for. It is
recommended that this KPI be removed with
the existing KPI titled Percentage of
people earning less than the real Living
Wage being a more relevant indicator for
the action and priority at a more granular
level.
Percentage of
people earning
less than the
real Living
Wage
Influence 25.3% 16.5% 12% 13.8%
(provis.)
N/A
Awaiting Data
TBC15% N/A
(24/25
Target
Set but
data not
yet
available)
The 2023/24 figure is currently provisional
ahead of finalisation in November 2025,
when the provisional figure for 2024/25 will
also be released.
Page 33 of 396

Page 34

11 
PKC - GENERAL
Priority: Tackling climate change
and supporting greener sustainable
places 
We continue to deliver the Climate Change Strategy and Action
Plan for Perth and Kinross. This sets out our plans and actions to
reduce carbon emissions and build resilience, meet our regulatory
requirements and protect our environment for current and future
generations. 
Action: Support the prioritisation of sustainable,
cleaner and greener transport in line with the
National and Regional Transport Strategies 
We closely monitor UK and Scottish Government targets relating to
green transport to ensure that we adhere to these. We also
participate in Transport Scotland’s Policy Consultative Group to
contribute to and learn from peer organisations. 
We continue to support our Community Transport Groups across
Perth and Kinross with our Community Transport Forum and by
directly liaising with communities who approach us seeking support
to establish a new Community Transport Group.  The Public
Transport Unit has invested the majority of the Scottish
Government’s Community Bus Fund in purchasing MPVs for long
term loan to several Community Transport Groups to enable them
to deliver transport locally with volunteer drivers. 
Elected members approved a motion to transfer Council minibuses,
which have reached the end of their Council life, to Community
Groups, rather than sending the vehicles to auction. 
Free bus travel was funded throughout Perth and Kinross on the
first Saturday of each month, from June 2024 - March 2025, for
passengers who do not hold a free bus pass.  A total of 38, 042
passengers benefited from this offer.
Action: Improve the energy efficiency of our Council
housing stock and public buildings, and encourage
our partners and private householders to consider
where they can make improvements 
In 2024/25, we made strong progress in improving the energy
efficiency of homes and supporting low-carbon living. Our work
focused on delivering new energy-efficient housing, upgrading
existing stock, and enabling private homeowners to access funding
for improvements. These efforts contribute directly to reducing fuel
poverty and lowering carbon emissions across Perth and Kinross.
Key activities contributing to this in 2024/25 include:
• 37 new affordable social rent homes were completed in
Methven, Rattray and Kinross, all with high insulation levels and
solar panels to reduce energy bills and carbon footprint. 
• Prioritising energy efficiency improvements to homes in Energy
Performance Certificates (EPC) Bands E and F, which currently
represent 2.6% of our housing stock. This work will contribute to
ensuring all our homes meet the Scottish Government’s
minimum EPC Band D target by 2025. Access challenges
remain and our housing teams are working to resolve this. 
• 440 properties were upgraded to meet the Energy Efficiency
Standard for Social Housing (EESH) standards in 2024/25. As
of March 2025, 87% of properties meet EESH - a 5%
improvement from the previous year. We continue to work with
tenants and teams to improve more properties where possible.
• A £6.5m refurbishment began at the Double Dykes Gypsy
Traveller site in Perth, replacing existing chalets with more
energy efficient homes. Five chalets were delivered by April
2025 with energy-efficient heating, hot water systems and
renewable technology.
Page 34 of 396

Page 35

12 
PKC - GENERAL
• Over £3m in grants were issued by March 2025 through the
Home Energy Efficiency Programmes for Scotland Area
Based Schemes (HEEPS ABS) and ECO4 schemes to help
private homeowners improve the energy efficiency of their
properties.
• 1,638 households were provided with free home energy advice
to help reduce energy bills, write off energy debt, improve
energy efficiency and reduce damp and mould.   
Action: To conserve and enhance the biodiversity of
our natural environment 
We made strong progress in protecting and improving biodiversity
across Perth and Kinross, recognising its vital role in building
climate resilience. Our actions have focused on tree planting,
habitat restoration, community engagement, and targeted
ecological improvements. These efforts help us create healthier
ecosystems, support wildlife, and strengthen our response to
climate change. Key activities contributing to this in 2024/25
include: 
• Planting 3,142 trees in our open spaces – an increase from
2,512 in 2023/24 – boosting carbon capture and contributing to
climate resilience and flood mitigation.
• We supported the Grow Wild initiative by distributing the locally
cultivated Westbank Wonder Mix, a native pollinator seed blend
that reduces reliance on water-intensive annuals and
strengthens Nature Networks. Community involvement was
central to this success, with 20 groups receiving native
herbaceous plants, 15 receiving wildflower seeds, and 7
receiving pollinator shrubs to enrich local green spaces.
• Our ecology reports guided targeted biodiversity work in parks
and graveyards in collaboration with local communities,
including removing invasive species. Meanwhile, pond
enhancement projects at six sites introduced native planting,
hedgehog-friendly designs, and amphibian hibernacula—
creating thriving habitats for diverse wildlife.
• 16 Nature Restoration Fund grants were awarded, with three
more deferred to 2025-26. These empowered council teams
and community groups to make lasting improvements for
nature. 
• The community NRF projects spanned around 199ha of
restoration and included: invasive species control; riparian
habitat restoration; tree and shrub planting; wildflower meadow
creation; pond enhancement; surveying; a new tree nursery;
and provision of tools and training for sustainable land
management. 
CASE STUDY
Biodiversity Towns and Villages Project funding of £277k
was utilised to set up 3 Biodiversity towns, 10 Biodiversity
villages and 2 Biodiversity neighbourhoods.  This case
study highlights projects rolled out across communities that
are helping to restore natural habitats which provide food
and shelter for wildlife, supporting a thriving ecosystem. 
Action: To adapt to and mitigate the impact of
climate change on the way we operate
We are taking practical steps to reduce the impact of climate
change on our operations and communities. From flood protection
and waste reduction to sustainable reuse initiatives, our work is
helping to build resilience, protect homes and infrastructure, and
support a circular economy. These actions reflect our commitment
to climate adaptation and mitigation across Perth and Kinross. Key
activities contributing to this in 2024/25 include:  
Page 35 of 396

Page 36

13 
PKC - GENERAL
• We advanced flood risk management by completing the Perth
Surface Water Flood Study and starting studies and plans in
Bridge of Earn, Comrie, and Scone. We also progressed the
Milnathort Flood Protection Scheme and began preparatory
work for the Blairgowrie & Rattray Surface Water Management
Plan, and data collection to support the outline design of the
Dunkeld and Craigie Flood Protection Schemes.
• Construction of the Comrie Flood Protection Scheme began
following Council approval in November 2023. It remains on
track for completion anticipated in Q4 2026 and within budget.
The South Kinross Flood Protection Scheme was formally
notified to the Scottish Government, with a Local Authority
Hearing scheduled for October 2025. 
• Our dedicated two-person Watercourse Inspector team carried
out routine inspections and maintenance of key watercourses
throughout the year, replacing the previous seasonal student
support. In total, £4.3 million was invested in capital projects
and £0.4 million in revenue projects to reduce flood risk and
support essential works.
• We launched a mattress reuse project with local charity PUSH,
supported by £24,873 funding from the Zero Waste Scotland
Small RIF fund. Donated mattresses are cleaned, sanitised
sold affordably - diverting mattresses from incineration and
creating employment opportunities. 
• Following the successful securing of £2.72m of capital
investment from the Scottish Government Recycling
Improvement Fund (RIF), we introduced a new twinstream
collection, with an improved kerbside recycling service for
around 97% of householders. Whilst the 2024/25 performance
figures are awaiting verification, updated 2023/24 figures show
an overall increase in household recycling rates to 51.7%.
• An additional bonus with the separation of products has
resulted in a financial benefit with an increase of income from
recyclable items. 
CASE STUDY
Cross Tay Link Road Carbon Management embedded
sustainability into every stage of design and construction,
achieving over 51,000 tCO₂e in carbon savings. Key
innovations included the use of flexible pavement with a
hydraulically bound material (HBM) base, low-carbon
concrete mixes, and sustainable drainage systems. Carbon
reduction was made a contractual requirement, with
procurement and design decisions driving measurable
environmental benefits. The project is now recognised
nationally as a leading example of low-carbon infrastructure
delivery. 
Areas of Focus
• Ensure we have a cleaner and greener Council fleet 
• Develop local public transport solutions which set the
needs of residents and the environment as top priority
• Improved energy efficiency and reduction in carbon
emissions in the Council estate
• Increase provision of biodiversity sites 
Links to other Performance Information
➢ Waste Management Plan 2010-2025 -  Final Update
(Plan being revised in early 2026) 
➢ Fleet Decarbonisation Strategy
➢ List of Nature Restoration Fund Projects 2024/25 
Page 36 of 396

Page 37

14 
PKC - GENERAL
Key Performance Indicators related to this priority:
Data will be indicative of performance and should be considered in the context of the current operating environment and level of influence. 
Key Actions
(summary) Indicator Control /
Influence
Performance Comments
21/22 22/23 23/24 24/25 Annual
Change Target
Target
Met/Not
Met 
Support the
prioritisation
of
sustainable,
cleaner, and
greener 
Number of
publicly
available
charging
devices per
100,000
population 
Influence 86.2 125.5 133.9 175.4

349  It should be noted that the target for this KPI in
previous reports had been based on the number of
charging connectors, of which there are two in every
unit. The target has been amended to reflect the
number of units in line with the KPI measure going
forward. It will also rise with a predicted 30% increase
in uptake of electric vehicles following a local strategy
developed alongside Urban Foresight in 2023.
However recent law changes on the taxation of electric
vehicles may affect the actual uptake. 
We estimate that planned progress is delayed by
around a year, due to delays in funding. A large-scale
contract is set to be awarded in April 2026,
earmarking the install of approx. 100 charging units. 
Percentage
of Council
fleet
vehicles
that are
electric or
other zero
direct
carbon fuel
technologie
s
Control 5.3% 3.8% 3.6% 4.5%

3.85%    The Council added 3 more electric vehicles to its fleet
in 2024/25. We will continue to closely monitor
developments in evolving new technologies,
particularly electric and hydrogen. The Binn Ecopark
Hydrogen Facility being developed by Green Cat
Energy in Glenfarg, could make hydrogen a viable
option within Perth and Kinross. If it is completed by
June 2027 this would allow the Council’s Fleet Team
to review the options for using hydrogen as a fuel
source for our HGV fleet ahead of the national target
of ceasing petrol/diesel vehicle production in 2030. 
We are working on a project looking at the introduction
of a hydrogen facility within our Friarton Depot. If
successful, it could see hydrogen being available on
Page 37 of 396

Page 38

15 
PKC - GENERAL
Key Actions
(summary) Indicator Control /
Influence
Performance Comments
21/22 22/23 23/24 24/25 Annual
Change Target
Target
Met/Not
Met 
site also from 2027. Using Hydrotreated Vegetable Oil
(HVO) in the Council waste fleet should also see CO2
savings of c1000 tonnes by 2027.
Improve the
energy
efficiency of
our
buildings,
and
encourage
our partners
and private
householder
s to consider
improvement
s
Percentage
of Council
housing
meeting the
Energy
Efficient
Standard 2
for social
housing
(minimum
EPC B)
Control 6.2% 6.6% 7.1% 8.0%

8.0%    Of the total housing stock (8,226 properties as of 31
March 2025), we’ve increased the number meeting
the Energy Efficient Standard 2 for Social Housing
from 565 to - an increase of 92. This was achieved
through new builds and investment in existing
properties, despite access challenges.
Scope 1
and 2
Emissions
from
Council
Non-
Domestic
Estate
(tonnes
CO2e) 
Control 10,761 9,226 9,080 8,976

Rolling
3% per
annum
reductio
n
Although the national electricity emissions factor
remained unchanged, which means switching from
gas to electricity would not lead to a drop in carbon
emissions, our overall emissions still fell. This is due
to reduced energy use across our buildings and
services. It should be borne in mind that emissions will
be heavily influenced by the assets held within the
estate and reductions have been achieved despite
increases in Gross Internal Floor Area with inclusion
of Perth Museum and Bells Sports Centre.
To conserve
and enhance
the
biodiversity
of our natural
environment 
Area
grassland
managed by
PKC for
biodiversity
improvemen
t objectives
(ha)
Control 21.8ha 40.4ha 40.4ha 121.5ha

N/A
(Target
not set)
N/A We more than doubled our management of grassland
areas included in Grow Wild, increasing from 49.16ha
to 121.5ha. Early monitoring has shown noticeable
increases in insect and flower populations in unmown
areas.
Page 38 of 396

Page 39

16 
PKC - GENERAL
Key Actions
(summary) Indicator Control /
Influence
Performance Comments
21/22 22/23 23/24 24/25 Annual
Change Target
Target
Met/Not
Met 
To adapt to
and mitigate
the impact of
climate
changes on
the way we
operate
Total
household
waste
recycled/co
mposted as
% of all
household
waste 
Influence 50.2% 49.3% 51.7% N/A
(Awaiting
verification)

60%  2023/24 figures have been revised following SEPA
verification and show an increase of 2.4% on the
previous year. 2024/25 data is yet to be verified;
however we project that there is a further increase,
largely due to the new kerbside recycling system
(twinstream).
Previously this was documented in the Waste
Management Plan (WMP), however going forward this
will be incorporated in the Circular Economy Strategy.
Historic data for this KPI has been amended to reflect
a consistent reporting period aligned with the calendar
year data reported to SEPA.
Climate
Change
Assessment
Tool (CCAT)
overall score
Control 61% 69% 71% 74%

78% Our score improved by 3%, with strong gains in
Adaptation (up from 79% to 96%), Emissions (up by 5
points) and Behaviour (up by 5 points).
Procurement remains the lowest category at 38%,
with no change from last year. Improvement is aimed
for in future years following a new five-year
Sustainable Procurement Strategy being approved in
June 2024. Governance dropped by 18 points, despite
an increase in the accountability by senior
management score. The 2023/24 score was artificially
inflated due to a one-off internal audit that wasn’t
repeated this year.
Page 39 of 396

Page 40

17
ANNUAL PERFORMANCE REPORT 2024/25
PKC - GENERAL
Priority: Developing a resilient,
stronger and greener local economy
Action: Support and promote business growth,
business and place innovation and investment in
both our urban and rural areas 
In 2024/25, we strengthened our support for business growth and
innovation across Perth and Kinross, with a particular focus on
start-ups, rural enterprises, digital industries, and inward
investment. Our efforts have led to increased engagement,
exceeded programme targets, and laid the groundwork for future
sustainable development. We continue to build a dynamic and
inclusive business ecosystem that reflects our commitment to
entrepreneurship, creativity, and economic resilience. Key activities
contributing to this in 2024/25 include: 
• Supporting 252 business start-ups through Business Gateway,
exceeding last year’s figures and surpassing our New Start and
Pre-Start Plus programme target with 22 businesses supported.
• Leading the Tayside region in Business Gateway Growth
referrals, with 23 high-potential businesses projecting turnover
increases of £200k+, highlighting strong entrepreneurial
momentum.
• Providing tailored support to 254 micro-enterprises, self-
employed individuals, and social enterprises through GrowBiz,
significantly exceeding our target of 180.
• Enabling 231 businesses to participate in learning and
networking sessions, with 43% aligned to our targeted growth
sectors, and 76 new businesses supported to begin trading.
• Expanding Perthshire Artisans to support 168 creative sector
businesses—well above our target of 36—demonstrating a
thriving rural enterprise culture.
• Designing work and related investigations for the first phase of
the Perth Eco-Innovation Park (11ha), progressing Heads of
Terms to unlock sustainable business growth.
• Maintaining steady interest in our industrial sites, including
Northfield Business Park, with ongoing enquiries from
businesses seeking premises in established hubs.
• Launching a refreshed Invest in Perth website in October 2024,
improving mobile responsiveness and accessibility, resulting in a
24% increase in traffic over six months.
• Introducing a new Customer Relationship Management system
in January 2025 to enhance tracking of business interactions,
improve economic intelligence, and strengthen our engagement
impact.
• Continuing to support innovation through the Perth Ideas Centre
at Creative Exchange, offering entrepreneurs and Small to
Medium Enterprises access to technical equipment, training, and
events focused on creative and digital industries.
• Hosting Techscaler, delivered by CodeBase, at the Ideas Centre,
reinforcing Perth and Kinross’s profile as a hub for scaling tech
businesses.
• Delivering The Angel’s Share programme, enabling local
businesses to pitch to certified investors, attracting inward
investment and encouraging relocation to the region. 
Action: Invest in innovative green power and smart
technology solutions to reduce reliance on
electricity from the national grid and create
opportunities for business growth and regeneration
We are reducing reliance on the national grid by investing in low-
carbon energy and smart technology—supporting both
Page 40 of 396

Page 41

18
ANNUAL PERFORMANCE REPORT 2024/25
PKC - GENERAL
sustainability and local economic growth. Key activities contributing
to this in 2024/25 include: 
• We progressed two major clean energy projects featuring heat
pumps and solar panels, helping to reduce emissions and
energy costs across our estate.
• We installed a medium-scale heat pump system at a rural
primary school, replacing oil heating with a cleaner alternative.
• We are actively exploring new partnerships and agreements to
expand solar power and battery storage, aiming to increase on-
site energy generation and reduce grid dependency. 
• As the national grid becomes greener, we remain committed to
using electricity—especially through heat pumps—as our main
heating source, while continuing to invest in smart, low-carbon
technologies. 
Action: Promote what our city and towns have to
offer to businesses, investors and tourists by
capitalising on built and natural heritage and assets
such as the new Perth Museum and the benefits to
the whole area of Perth’s status as UNESCO City of
Craft and Folk Art 
In 2024/25, we continued to position Perth and Kinross as a vibrant
and distinctive destination for business, investment, and tourism. By
leveraging our cultural identity, natural assets, and international
recognition as a UNESCO City of Craft and Folk Art, we delivered
impactful programmes and infrastructure that enhanced community
engagement, boosted visitor numbers, and supported economic
growth. Key activities contributing to this in 2024/25 include: 
• Promoted Perth and Kinross as a dynamic destination by
building on our UNESCO City of Craft and Folk Art status and
showcasing our cultural and natural assets.
• Delivered a curated programme of high-impact creative projects
through local, national, and international partnerships, with
ongoing work to embed creativity into everyday community life
through new assets and infrastructure.
• Grew the Perth City & Towns platform to over 100,000 active
users, supporting local businesses and events through a multi-
platform marketing strategy and targeted campaigns with
partners such as Expedia, TripAdvisor, and Scotland’s Tay
Country.
• Achieved a 25.1% increase in total visitor numbers, with day
visitors up 21% and overnight stays up 21.6%, contributing to a
33% rise in direct visitor spend and a 37% increase in the
sector’s overall economic impact.
• Strengthened cultural tourism and regeneration through strategic
promotion and investment, including the successful opening of
the new Perth Museum as a flagship attraction. 
CASE STUDY
The opening of Perth Museum marked a major cultural
milestone for the city, transforming the historic City Hall into
a vibrant heritage destination. With £27.5 million in funding
from the Council and the Tay Cities Deal, the museum
welcomed over 128,000 visitors in its first four months.
Community pride was reignited through the return of the
Stone of Destiny, while the museum’s design and
programming aim to boost tourism, celebrate local history,
and reposition Perth as a key cultural hub in Scotland.
Page 41 of 396

Page 42

19
ANNUAL PERFORMANCE REPORT 2024/25
PKC - GENERAL
Action: Support individuals into work and to progress
into better paid work, encouraging businesses to
access initiatives to create new opportunities for
those furthest from the employment market and
those currently in low wage jobs 
We are helping people across Perth and Kinross access learning,
training, and employment—especially those furthest from the job
market or in low-paid roles. By working with local partners and
businesses, we are creating pathways into sustainable, better-paid
work and supporting inclusive economic growth. Key activities
contributing to this in 2024/25 include: 
• We supported 618 adults to achieve learning outcomes – more
than double our target of 300 – through SQA-accredited courses
and short programmes in communications, numeracy, digital
skills employability, volunteering and English for Speakers of
Other Languages (ESOL). 
• We awarded £92,000 through the Adult Learning in the
Community Fund to support 8 local organisations, reaching 220
learners through a diverse range of projects. Projects included
ESOL support, rural skills training, digital literacy, employability
programmes, and volunteer driver training.
• Our adult advisors supported 48 people into employment, with
outreach support available in Letham, Blairgowrie and Rattray,
Kinross, Auchterarder, and Crieff. 
• We launched a monthly employability drop-in the Letham Hub,
working with DWP and Skills Development Scotland. Through
this partnership the Council will also continue to work in Letham
on a weekly basis providing ongoing multi-disciplinary drop-in
services including housing, Welfare Rights and CAB, supporting
the “No Wrong Door” approach to service provision in Letham.
• Through the Skills Passport project, 58 unemployed clients
gained training awards, with 21 now in work or self-employed.
• Our Youth Employability Team registered 140 new young people
and 122 completed support – 94% of whom moved into a
positive destination. Staff are based in every secondary school in
Perth and Kinross delivering one-to-one and group support, and
sector-based academies, and work closely with local employers.  
CASE STUDY 
Futures for All – Employer Recruitment Incentive
supported Wild Hearth Bakery in Highland Perthshire to
create a baking apprenticeship for a young person at risk of
becoming NEET*. With £8,000 funding, the business
provided meaningful training and development, resulting in
the apprentice progressing to the Real Living Wage within
six months. The scheme has had a transformative impact,
with plans to expand support for inclusive employment
opportunities across all age groups.
*Not in Education, Employment, or Training
Areas of Focus
• Unlock new investment in employment and housing land to
support business growth in foundational and key growth sectors.
• Make Perth and Kinross a more competitive inward investment
destination and encourage investment for growth from existing
businesses in foundational and key growth sectors 
• Unlock private investment and expertise to support public and
private energy projects.   
• Continue to grow visitor numbers for holidays and day trips
• Further enhance our employability tracking and outreach
capacity, supporting individuals in community settings. 
Page 42 of 396

Page 43

20
ANNUAL PERFORMANCE REPORT 2024/25
PKC - GENERAL 
➢ Perth & Kinross Economic Action Plan
➢ Perth & Kinross Tourism Strategy and Action Plan
➢ Perth & Kinross Culture Strategy 
Links to other Performance Information
Page 43 of 396

Page 44

21
ANNUAL PERFORMANCE REPORT 2024/25
PKC - GENERAL
Key Performance Indicators related to this priority:
Data will be indicative of performance and should be considered in the context of the current operating environment and level of influence.
Key
Actions
(summary)
Indicator Control /
Influence
Performance
Comments
21/22 22/23 23/24 24/25 Annual
Change Target Met/Not
Met
Support
and
promote
business
growth and
investment 
Number of new
business start-ups
with support from
Business Gateway 
Influence 220 250 231 252

260  The number of business start-ups supported
by Business Gateway grew in 2024/25 and
shows level progress within the Tayside
Business Gateway LAs – slightly ahead of
Angus and just behind Dundee.
Area of available
Serviced
Employment Land
(Ha) 
Influence N/A (New Indicator) 17.57 26.15

35  This figure is based on the Employment Land
Audit 2025 (August 2025) and represents
employment land immediately available
across PK. There is an improved take-up of
2.7 ha per annum in the 3 years 2022-25
(compared to 2.1ha per annum in 8 years
prior to 2022). There is 269ha of land
constrained by minor factors including
physical, amenity and ownership constraints.
We are working with partners to make this
land immediately available. 
2024/25 saw 13 windfall planning permissions
for employment land on sites not allocated in
the Local Development Plan, and this
contributed to a strong uplift in the
immediately available land supply of over 9
hectares to 26.15 hectares.
Percentage of
premises
connected to
gigabit broadband 
Influence 40% 43% 46% 55%

50%    Gigabit-cable connectivity reached 55% of
premises, meeting our target. The recently
announced Scottish Government partnership
with GoFibre will connect 63,000 hard-to-
reach premises in Scotland, including areas
of Perth and Kinross – boosting future full
fibre coverage.
Page 44 of 396

Page 45

22
ANNUAL PERFORMANCE REPORT 2024/25
PKC - GENERAL
Key
Actions
(summary)
Indicator Control /
Influence
Performance
Comments
21/22 22/23 23/24 24/25 Annual
Change Target Met/Not
Met
Number of
registered
businesses in
Creative Industries
(including digital)
Influence 380 350 335 355 
(As of
Dec
2024)

400  There are 355 registered creative industry
businesses, including digital as of
December 2024. This data is captured
annually towards the end of the calendar
year (Nov/Dec) to capture data for that
period. We are delivering projects to grow
this number, guided by the Culture Strategy
2023-2025. Perth's designation as the UK’s
first and only UNESCO City of Crafts and
Folk Art is raising our profile as hub for
makers, crafters and creatives looking to
start and grow their practice or business.
Invest in
innovative
green
power and
smart
technology
solutions
Renewable energy
generated across
the PKC estate,
including from low
carbon heat sources
(MWh)
Control 2,535 2,226 2,703 2,593 
Rolling 3%
continual
improvement 
While additional Heat Pumps were installed
in 24/25, low carbon heat consumption fell
due to operational issues with biomass
boilers at Strathearn and Breadalbane
community campuses. These sites are our
largest sources of low carbon heat
generation. Investigative works are ongoing
to find a resolution. Electricity generation
increased significantly thanks to new solar
panel installations. 
It is recommended that this KPI be split into
two: one to reflect generation of renewable
energy; and one to reflect low carbon heat
source technology. This will assist in
demonstrating more clearly how we are
performing in these linked, but discreetly
separate areas.   
Page 45 of 396

Page 46

23
ANNUAL PERFORMANCE REPORT 2024/25
PKC - GENERAL
Key
Actions
(summary)
Indicator Control /
Influence
Performance
Comments
21/22 22/23 23/24 24/25 Annual
Change Target Met/Not
Met
Number of
registered
businesses in
energy (including
renewables growth
sector)
Influence 140 145 140  145

154  There are 145 registered energy businesses,
including renewables growth. We’ve received
multiple enquiries from companies interested
in locating in Perth and Kinross, but land and
office accommodation constraints together
with other business specific factors have
limited uptake. Recently Business Waste
ranked Perth as the 5th most sustainable UK
city for businesses, and first for renewable
energy capacity per 100, 000 people.
Promote
what our
city and
towns have
to offer to
businesses,
investors
and tourists
Investment in
economic
development and
tourism (£ per 1,000
population)
Control £100,569 £91,711 £85,842 N/A
(avail
Dec 25)

N/A
(not  
appropriate
to set targets
as national
methodology
being
reviewed)
N/A  Data for 2024-2025 not available until
publication of LGBF. Information is based
upon most recent data published 
Total number of
visits (in person) to
libraries, museums,
and galleries 
Influence 246K 441K 484K 765K

617k     Visitor numbers rose significantly, driven by
the successful opening of Perth Museum. Q1
saw a 106,307 rise in footfall, with library
visits up 10.5%. Q2 saw a further increase of
200,952 visits, including a 12.8% rise in
library footfall and 6,898 visits to Perth Art
Gallery and Alyth Museum. Q3 continued to
exceed targets, with library visits up 7%,
despite a temporary reduction in mobile
library services. Libraries showing notable
improvement included Auchterarder,
Breadalbane, Scone, Loch Leven, and North
Inch. Q4 saw a 58% increase in overall
footfall (+280,586), including a 550% rise in
museum visits and a 36% increase at Perth
Art Gallery following the reopening of two
galleries.
Page 46 of 396

Page 47

24
ANNUAL PERFORMANCE REPORT 2024/25
PKC - GENERAL
Key
Actions
(summary)
Indicator Control /
Influence
Performance
Comments
21/22 22/23 23/24 24/25 Annual
Change Target Met/Not
Met
Support
people into
work and
encourage
business to
access
initiatives to
create new
opportunitie
s 
Percentage of
unemployed people
assisted into work
from council
operated/funded
employability
programmes
Influence 15.7% 13.0% 13.7% 19.9%

15%  Notable improvement of +6.2% can, in part,
be attributed to increased engagement
through several key projects and
programmes. The Futures for Families
programme engaged 199 new families in
24/25. 45 of these clients have moved into
new self-employment opportunities with our
support. This, being a new initiative,
enhances the already existing suite of
options. 
A greater focus on new job creation saw
significant investment from PKC and Scottish
Government of £343k. This funding created
48 new jobs, 22 of which were Modern
Apprentices in micro and small businesses
locally. 
In addition, we have supported 233 people
into accredited training and qualifications. 
246 people with a disability were supported
into a positive destination.
Number of adult
learners achieving
outcomes 
Influence 279 780 901 618  300    A total of 618 adult learners achieved
outcomes across a range of programmes:
• 132 achieved Level 2 Food Hygiene.
• 159 learners completed digital skills
courses.
• 169 improved English skills through
ESOL classes.
• 43 achieved SQA qualifications at level 2,
3 or 4 in Numeracy, Communications or
ICT.
• 40 improved core literacy and numeracy.
• 75 completed ASDAN short courses. 
Page 47 of 396

Page 48

25
ANNUAL PERFORMANCE REPORT 2024/25
PKC - GENERAL
Key
Actions
(summary)
Indicator Control /
Influence
Performance
Comments
21/22 22/23 23/24 24/25 Annual
Change Target Met/Not
Met
Lower figures in some areas reflect reduced
demand following earlier surges, - e.g.
ESOL enrolments linked to the Ukraine war
and Food and Hygiene training for
volunteers during and post COVID. 
Page 48 of 396

Page 49

26
ANNUAL PERFORMANCE REPORT 2024/25 
PKC - GENERAL
Priority: Enabling our children and
young people to achieve their full
potential 
The PKC Raising Attainment Strategy 2024-2027 sets out a
shared vision, priorities, and expectations in relation to raising
attainment and achievement for every child and young person. This
strategy reflects the national ambitions of attaining excellence and
achieving equity. Progress is reported in the annual Education
Improvement Plan, presented at the Learning and Families
Committee 27 August 2025. 
Overall, schools and Early Learning and Childcare (ELC) settings in
PKC perform well and deliver high quality education as evidenced
through internal and external scrutiny, review and inspection
detailed below. Children and young people experience a curriculum
which considers equity and excellence with work ongoing to ensure
due consideration to the Cost of the School Day. 
Action: Ensure inclusive and quality education for
all and promote lifelong learning 
By using data effectively and focusing on equity, our schools and
early years settings are driving meaningful improvements and
helping children and young people reach their full potential. Key
activities contributing to this in 2024/25 include: 
• We strengthened the use of data in school improvement
planning. The majority of schools now include actions to reduce
the Cost of the School Day in their Quality Improvement Plans
for 2025/26 – ensuring equity is embedded in everyday
decision-making.
• Our Early Learning and Childcare settings outperformed both
national and comparator benchmarks in all Care Inspectorate
Quality Indicators, reflecting the consistently high standards
across Perth and Kinross.   
• Education Scotland inspected one secondary and seven
primary schools. Of the primary reports published in 2024/25
(two reports were for inspections undertaken in 2023/24), one
was graded “Very Good”, 16 “Good” and five “Satisfactory”. The
secondary school received one “Good” and one “Very Good”
88% 90% 88% 84% 88%
74% 76% 74%
66%
73%77% 80% 78% 72% 77%
0%
20%
40%
60%
80%
100%
Care, Play and
Learning
Setting Staff Team Leadership All QIs
How good is our ...
Quality Indicator (QIs) -Good or better (%)
Perth & Kinross Council Comparator Authorities National
Page 49 of 396

Page 50

27
ANNUAL PERFORMANCE REPORT 2024/25 
PKC - GENERAL
grading, with strengths in leadership, attainment and partnership
working. Schools have put in place action plans to address
identified improvements, supported by our Quality Improvement
Team. Common improvement themes identified in the
inspection reports included consistency in learning, teaching
and assessment, and better use of data to plan interventions.
These are being addressed through:
• individual action plans at school level
• service-wide initiatives including the introduction of
Principal Teachers of Learning and Teaching, funded by
Strategic Equity Funding
• universal, tailored or intensive support to schools and
ELC settings to improve approaches to learning and
teaching and the use of our Learning and Teaching
Framework. 
• A National Thematic Inspection by His Majesty’s Chief Inspector
of Education reviewed how local authorities support schools to
improve. The visit to Perth and Kinross found our advice and
guidance to be clear and comprehensive, with strong
expectations set around standards and planning. Our
responsive, risk-based approach to providing support and
challenge to schools along with formal Quality Improvement
Reviews were highlighted as good practice.
• Quality Improvement identified key strengths and areas for
development, which correlate with the findings of Education
Scotland Inspections. These include key strengths such as: 
• positive climate and ethos in schools 
• effective use of data for improvement 
• targeted use of Pupil Equity Funding (PEF) to close the
poverty-related attainment gap
• impactful local authority-led programmes, including the
National Improving Writing programme and Numeracy
Schools initiative  
Areas for development included:
• strategic approaches to self-evaluation and involving
children, young people and their families
• assessment and moderation practices
• consistency in learning and teaching expectations 
CASE STUDY
By utilising Nurturing approaches, which recognise that
positive relationships are central to learning, wellbeing and
resilience, Riverside Primary School delivered training and a
programme of activities to develop positive self-esteem
among children and young people, with involvement from
families and carers. 
• We made strong progress across all Additional Support Needs
(ASN) Transformation Programme workstreams, including:
support staff; professional learning; inclusive environments;
intensive support; transitions; speech and language therapy;
and data-informed decision-making. Examples include: 
• Extensive options appraisals and statutory consultation
processes were undertaken, involving a range of
stakeholders, on proposals to develop three new
Intensive Support Provisions (ISPs). These will open
(temporarily pending formal approval in January 2026) in
August 2025 providing intensive level learning and
support for a greater number of children and young
people within their own catchments.
• A new support staff allocation model to better match
staffing to identified learner needs. 
Page 50 of 396

Page 51

28
ANNUAL PERFORMANCE REPORT 2024/25 
PKC - GENERAL
• New data tools are helping school staff and central
officers to record pupils needs accurately and ensure the
right support is in place. 
• A revised Speech and Language Therapy contract now
includes a defined ‘core offer’ and annual review
process, allowing us to tailor priorities based on
emerging needs.
• Career Progression Pathway models for staff supporting
learners with ASN are being mapped to statutory duties
and staged levels of interventions, ensuring children are
supported by trained and skilled staff. 
• 45 schools and 3 ELC settings now hold a Digital Schools
Award, an increase of over 50% on 2023/24. Every school now
has a named Digital Champion. Perth and Kinross had the
second highest number of schools gaining Digital Schools
Awards during 2024/25.
• Schools are implementing the United Nations Convention on the
Rights of the Child (UNCRC) Act 2024 supported by published
guidance and shared examples of good practice.
• The Rights Respecting School Award (RRSA) programme is
active in many schools, with currently 16 holding the Silver
Award accreditation, and 14 holding the Gold Award. 
CASE STUDY
Over the course of 2024/25 Crieff Primary School has been
working with Education Scotland, Children and Young
People Improvement Collaborative (CYPIC) and PKC central
officers on a pilot project to support practitioners to improve
learning, teaching and assessment of Numeracy. 
Action: Reduce the poverty-related attainment gap
By tracking progress over time and targeting support where it’s
needed most, we’re helping more children and young people
achieve their potential—regardless of background. Key activities
contributing to this in 2024/25 include:
• We’ve seen steady improvement in literacy attainment across
P1, P4 and P7. The gap between the most and least deprived
cohorts narrowed from 27% in 2020/21 to 21% in 2023/24.
• Numeracy attainment has improved in both cohorts, but at a
slower rate for SIMD Q1 than for Q5. As a result, the poverty-
related attainment gap widened slightly in 2023/24. However,
the long-term trend still shows progress, with the gap narrowing
from 24% in 2020/21 to 22% in 2023/24. 
• Senior phase leaver data shows significant progress:
• the gap between SIMD Q1 and SIMD Q5 in achieving at
least one Level 6 qualification reduced from 40% in
2021/22 to 28% in 2023/24
• the gap for leaving with at least one Level 5 qualification
narrowed from 28% to 19% over the same period. 
Action: Ensure that Looked After children and
children and young people with additional support
needs achieve health, wellbeing and education
outcomes comparable with their peers 
Through targeted support, partnership working, and a refreshed
policy framework, we’re improving outcomes in education, health
and wellbeing. Key activities contributing to this in 2024/25 include:
Page 51 of 396

Page 52

29
ANNUAL PERFORMANCE REPORT 2024/25 
PKC - GENERAL
• Our new Corporate Parenting Plan 2025-30 sets out clear
priorities to support Looked After Children to achieve their full
potential. Progress is monitored by the Corporate Parenting sub-
group of the Children, Young People and Families Partnership.
• The Care Experience Children and Young People Fund enabled
the recruitment of two additional youth workers, ensuring every
secondary school has a dedicated contact/support youth worker
for care-experienced pupils, strengthening relationships and
support.
• In 2023/24, 60% (12 out of 20) of Looked After young people
attained at least one SCQF Level 4 qualification, below the
national average of 72%, and attainment remains below that of
all school leavers. Care should be taken when comparing these
figures across years and cohorts due to the small numbers
involved. A sub-group of the Raising Attainment Board has been
established to focus on further improvements. Actions include:
• Appointment of a Promise Improvement Lead
(Education) to support attendance and raising attainment
for all care experienced children and young people and
young carers.
• Delivery of refreshed guidance and training for school
staff to ensure consistency of practice.
• A Services for Young People project is being developed to
improve attendance for care-experienced young people
providing a tailored support to tackle the barriers to
attendance.  This will be part-funded through the Care
Experience Children and Young People Fund. 
• The Staged Intervention Framework was implemented across
Early Learning and Childcare settings and schools, offering a
clear structure to support learners who face barriers. In
September 2024, 39% of pupils (6,973) were identified as facing
barriers - up from 35% in 2022/23.
• The Staged Intervention Model promotes early intervention
through a four-level framework, involving the child or young
person, their parents or carers, school staff and, where relevant,
other professionals, in developing a Child’s Plan. Annual audits
will monitor implementation and consistency.
• Schools are using a range of initiatives to support care-
experienced learners, including: 
• one-to-one tutoring from the Volunteer Tutors
Organisation (40 pupils supported, 14 of these showed
improved attendance)
• mentoring through MCR Pathways
• Learning Hubs at Riverside and Letham Primary Schools
• Champions Boards in every secondary school,
supported by Youth Services 
• Attendance for children and young people who are looked after
at home has fallen in the last academic session, from 77% in
2023/24 to 53% in 2024/25. The largest fall was for young
people in S2 and S3 in secondary school, although these
numbers need to be treated with caution as these are usually
very small cohorts of pupils (33 pupils with attendance under
90%). Reviewing Officers and the Promise Improvement Lead
(Education) are working in close partnership to ensure barriers to
attendance and participation in learning are identified and joint
planning is in place.
• Outcomes for our care-experienced learners are improving, with
higher attainment in literacy and numeracy. More care
experienced young people are entering positive destinations on
leaving school (up from 82% in 2022/23 to 95% in 2023/24),
although gaps remain compared to their peers.  Changes in this
area need to be judged carefully as they refer to very small
cohorts of young people, often less than 20 per year.
• Fairview School won a national award for its work to promote
inclusion and celebration of ASN learners. 
Page 52 of 396

Page 53

30
ANNUAL PERFORMANCE REPORT 2024/25 
PKC - GENERAL 
CASE STUDY
Funding from the Scottish Attainment Challenge’s Care-
experienced Children and Young People fund has enabled the
facilitation of Learning Hubs in Riverside and Letham Primary
Schools to provide additional support for care-experienced
children and young people to achieve their potential. 
Areas of Focus
• Attainment at key milestones is raised for all children and young
people.
• Attendance rates improve, particularly in the secondary sector.  
• Increase the number of young people going into positive
destinations such as work experience, further education,
volunteering and employment.
• Improved understanding of causes of attainment gap so that
effective interventions can be identified and implemented.
• Improve support to children and young people with additional
support needs to realise their full potential.
• Provide Kinship Carers with a range of supports to enable them
to meet the needs of children in their care. 
Links to other Performance Information
➢ Raising Attainment Update 2023/24 (Item 9)
➢ Corporate Parenting Plan 2025-2030 (Item 7)
Page 53 of 396

Page 54

31
ANNUAL PERFORMANCE REPORT 2024/25 
PKC - GENERAL
Key Performance Indicators related to this priority:
Data will be indicative of performance and should be considered in the context of the current operating environment and level of influence.
*Attainment indicator data will not be published until February 2026; therefore, change relate to the most recent year of publication. 
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24 Annual
Change Target
Target
Met/
Not Met
Ensure
inclusive and
quality
education for
all and
promote
lifelong
learning 
Percentage of
children meeting
expected
developmental
milestones when
entering primary
school 
Influence 82.0% 81.7% 80.6% 75.6%  81%  In 2023/24, 75.6% of P1 children met all expected
developmental milestones – a decrease likely to be linked to
the cohort being born in during the COVID-19 pandemic,
when early supports were not available to families. Public
Health Scotland confirms a national increase in
developmental concerns at age 4-5 reviews. Additionally, the
percentage of additional support needs (ASN) within this
cohort is slightly higher. Of those, 68% did not meet all
milestones, up from 44% last year. This cohort also includes
a higher proportion of boys (54% this year compared to 49%
last year), and research tells us that boys typically make
slower progress at this stage of development. Within this
cohort more children are recorded as not having achieved
one developmental milestone, rising from 267 last year to
298 this year. Particular issues are attention, emotional,
social and speech and language which all show an increase
of 3%. Through the embedded work of the Communication
and Wellbeing Champions who plan and model daily high-
quality play and learning experiences, there is a focus on
early intervention to support development. ELC settings
continue to focus on high-quality provision, outdoor learning,
and emotional resilience to address developmental concerns
and support children’s progress.
Percentage of
primary school
pupils (P1, P4 &
P7 combined)
achieving
expected levels
Control 74% 77% 78% 80%

79%      There has been a steady upward trend in this measure over
time from 74% in 2020/21 to 80% in 2023/24. This compares
favourably with the Scottish average of 81%. Literacy
attainment gaps between the most and least deprived pupils
have narrowed from 27% in 2020/21 to 21% in 2023/24. In
numeracy, although both SIMD Q5 and SIMD Q1 have
Page 54 of 396

Page 55

32
ANNUAL PERFORMANCE REPORT 2024/25 
PKC - GENERAL
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24 Annual
Change Target
Target
Met/
Not Met 
Ensure
inclusive and
quality
education for
all and
promote
lifelong
learning 
in literacy and
numeracy
improved, the gap has widened due to faster progress among
the least deprived cohort. The Education Improvement Plan
for 2025/26 prioritises numeracy, with targeted support for
schools where numeracy attainment is below 70% or where
gaps persist. This includes rollout of the pilot Improving
Numeracy Project, completed in one setting in 2024/25.
Proportion of
school leavers
attaining 1 or
more passes at
SCQF Level 5 
Control 89% 89% 90% 88%  91%  Leaver attainment at Level 5 declined slightly in 2023/24 but
remains above the national average (83.5%). Attainment at
Level 6 has remained stable, outperforming the national
trend, which has steadily declined to 57.4% over the last
three years. This may reflect the return to full course
assessment for the first time since 2019. There has been a
focus on a data driven senior phase curriculum to ensure that
there is breadth, progression, depth, personalisation and
choice available in the senior phase. This includes the
development of Foundation Apprenticeships and a focus on
developing qualifications in partnership with employers and
industry.
Proportion of
school leavers
attaining 1 or
more passes at
SCQF Level 6 
Control 71% 66% 66% 66%

67% 
Participation of
16–19-year-olds
participating in
learning, training
or work (%)
Influence 94% 94% 93% 93%

93%    There have been changes to how this data set has been
collated. HM Revenue & Customs (HMRC) data was included
within the data set (for the first time) in 2023 but was
removed from the 2024 APM data set. To ensure
comparability across publications, the 2023 data set has
been revised to allow for comparisons between different
years to be made on a like for like basis.  This change has
been reflected in the data recorded here.
This measure is influenced by a range of other partners
including Skills Development Scotland and UHI Perth. Our
teams are working closely with them to ensure that young
people achieve sustained positive destinations.
Page 55 of 396

Page 56

33
ANNUAL PERFORMANCE REPORT 2024/25 
PKC - GENERAL
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24 Annual
Change Target
Target
Met/
Not Met
Reduce the
poverty-
related
attainment
gap
Percentage gap
between SIMD 1
and SIMD 5 for
school leavers
attaining 1 or
more passes at
SCQF Level 5
Control 28% 24% 17% 19%  24%    The coronavirus pandemic (COVID-19) led to changes in
how National Qualifications were assessed and graded, and
this will have had an impact on the attainment of school
leavers in 2019/20, 2020/21, 2021/22 and 2022/23. 2023/24
data demonstrates that the poverty related attainment gap at
Level 5 has maintained a steady downward trend from 28%
in 2020/21 to 19% in 2023/24, and at Level 6 has reduced
from 41% in 2020/21 to 28% in 2023/24 with year-on-year
reductions. This compares favourably with the national
picture where the gap was 22.7% at Level 5 in 2023/24;
wider than in 2022/23 (20.2%). At Level 6 this also compares
favourably with the national picture where the gap was 38.4%
in 2023/24; wider than in 2022/23 (36.9%).
Percentage gap
between SIMD 1
and SIMD 5 for
school leavers
attaining 1 or
more passes at
SCQF Level 6
Control 41% 35% 29% 28%  34%   
Ensure that
Looked After
Children and
children and
young people
with
additional
support
needs
achieve
comparable
outcomes
Percentage of
children being
looked after in
community
placements
rather than
residential
placements –
balance of care 
Control 96% 94% 94% 95%
(as at 31st
July
2024)

N/A
(Target
not set) 
N/A Data for 2024-2025 not available until publication of
LGBF. Information is based upon most recent data
published. 
In 2023/24 there were 248 Looked After Children, with 95%
looked after in the community – above the national figure of
89%. The overall number of children who are looked after
has continued to decrease, however the population is
changing. More are now looked after at home, looked after
but living independently, or are in kinship arrangements. This
reflects the success of early intervention projects and Family
Group Decision Making (FGDM), helping families support
each other and keep children within their birth families. 
Percentage of
school leavers
looked after
within the last
Control 62% 87% 87% 60%  72%  We recognise that this group is a key priority for improved
attainment. We have recently appointed a Promise
Implementation Lead (Education) to track the educational
Page 56 of 396

Page 57

34
ANNUAL PERFORMANCE REPORT 2024/25 
PKC - GENERAL
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24 Annual
Change Target
Target
Met/
Not Met
year with 1 or
more
qualification at
SCQF level 4 
journeys of all school aged looked after children and young
people. 
Note: Care should be taking when comparing these figures
across years and cohorts due to the small numbers involved.
The drop in performance from 2022/23 to 2023/24 amounted
to a change in actual numbers of only 1. 
Page 57 of 396

Page 58

35 
PKC - GENERAL
Priority: Protecting and caring for our
most vulnerable people 
Under the Social Work (Scotland) Act 1968, as amended by the
Local Government (Scotland) Act 1994, Scottish local authorities
hold statutory responsibility for delivering social work services.
Children, Families and Justice Social Work are delivered by the
Council, whereas Adult Social Work and Social Care services are
delivered through the Perth and Kinross Health and Social Care
Partnership (HSCP), under the governance of the Integration Joint
Board (IJB). The IJB Annual Performance Report 2024-2025
outlines progress against the strategic ambitions set out in the IJB’s
Strategic Plan 2024-2027. 
This section draws on key highlights and performance information
from both services delivered by the council and those delegated to
the IJB to protect and care for our most vulnerable people. 
Action: Ensure we quickly identify children, young
people and adults at risk of harm and abuse and
take the necessary actions to keep them safe 
Through strong multi-agency working, trauma-informed practice,
and continuous improvement, we act quickly to identify risk and
provide the right support at the right time. Key activities contributing
to this in 2024/25 include: 
• In 2024/25 8,832 referrals were made to the Child Protection
Duty Team – an increase of 9% from the previous year. This
appears to be stabilising after increasing year on year post
COVID-19. All referrals are triaged within 24 hours, with
immediate action taken. Where significant child protection
concerns are identified, we include Inter-Agency Referral
Discussions (IRDs) or support via the Multi-Agency Screening
Hub (MASH).
• The Scottish Child Interview Model (SCIM), introduced across
Tayside in May 2024, is now well imbedded in child protection
processes. This trauma-informed approach was used in 85% of
all interviews in 2024/25, ensuring children have the best
possible opportunity to tell their story. Cross-boundary working
with trained staff has strengthened consistency and access.
• MASH continues to provide early help to families in need,
bringing together statutory and third-sector partners to share
information and direct families to the most appropriate support
as soon as possible.
• The Child Protection Committee (CPC) launched its updated
CPC Improvement Plan 2025 to 2028, supported by a new
strategy and schedule to guide self-evaluation activities. Audits
led by the Child Protection Interagency Coordinator highlighted
strong practices in relationship-based practice and rapid
responses to risk. Areas for improvement include enhancing
child and young people’s plans and better incorporation of their
views into decision-making.
• CPC Community of Practice events focused on professional
curiosity and managing professional differences. These
sessions were well attended and positively evaluated, helping to
refresh CPC guidance and support continuous service
improvement.
• In adult protection, complex cases are managed through a
multi-agency approach under the Adult Support and Protection
(ASP) Act. Referral analysis led to new triage pathways for
adults at risk due to addiction or mental health issues,
supporting earlier intervention.
• The ASP assessment framework was updated to focus on the
quality of outcomes for adults and unpaid carers. The ASP
workforce supports people in both urban and rural areas. Joint
work between adult and child protection committees is
Page 58 of 396

Page 59

36 
PKC - GENERAL
underway in Letham to better understand community views on
public protection.
• Reporting harm is actively encouraged. Although we see a
levelling in the total number of Adult Protection (AP) referrals, it
must be noted that the national ASP data that is made available,
data for 2024/2025 demonstrates that Perth and Kinross
receives more Vulnerable Person Reports (VPR) per head of
population and third highest in Scotland for the total number of
all AP referrals received. 
• The ASP Co-ordinator audits the AP concerns and VPRs that
are not screened within 24-hours (50 out of 3,147). Whilst the
majority of these that were not screened within 24-hours were
screened within 48-hours, the audit found that no adult was left
at any undue harm as a consequence of this delay. 
• Interagency Referral Discussions (IRDs) facilitate the multi-
agency sharing of information to determine how to safeguard
and adult at risk of harm. The process for IRDs in Perth and
Kinross has been found by the Care Inspectorate to be a good
example of services providing an early multi-agency response to
harm. 
CASE STUDY
This case study highlights the benefits of using the Safe and
Together approach – a relationship-based approach with
family to safely return children to their mother’s care.  This
approach involved engagement with parents and family
members ensuring children’s needs remained central. 
Action: Ensure that people get the right care,
accommodation and support where and when they
need it 
We’re focused on making sure people of all ages receive the right
care, support and housing at the right time. Whether through health
and social care, family-based support, or access to safe and
sustainable homes, our work aims to meet individual needs and
improve outcomes across Perth and Kinross. Key activities
contributing to this in 2024/25 include: 
• 64% of people with intensive care needs received ‘care at
home’, maintaining strong performance in line with the Scottish
average of 65%. This reflects our continued commitment to
helping people remain safely at home for as long as they wish to
do so.
• 97.6% of adults were discharged from hospital without delay,
consistently meeting the national target of fewer than 34.6 per
100,000 adults. This was supported by a number of
interventions which have reduced unmet care needs by around
800 hours since August 2024
• A new alliance contract with 15 care at home providers,
increasing care hours from 6,302 to 8,073. 
• Care at Home providers now using the PinPoint mapping tool to
better organise support provision. 
• Restructuring HART and HART+ teams to enable more
personalised and timely discharges, supporting 256 people (up
from 230) and increasing care hours from 1,450 to 1,847. HART
and HART+ is the Council’s internal care at home and
reablement service. 
Page 59 of 396

Page 60

37 
PKC - GENERAL
• During 2024/25 funded permanent placements to care homes
due to unpaid carer breakdown and/or crisis decreased from
17.5% in 2023/24 to 7%. This indicates early intervention and
prevention within the community for both the unpaid carer and
cared for remains critical. 
• Recruitment of host families for our unaccompanied asylum-
seeking children (UASC) has slowed despite targeted
recruitment campaigns. Alternative accommodation options are
being considered to ensure safe placements continue. 
• Foster carer recruitment remains challenging, but we’ve reduced
the number of children placed with independent fostering
agencies from 22 in 2023/24 to 16 in 2024/25, with two more
transitions planned in 2025/26. 
• At the end of March 2025, 13 young people were in residential
accommodation, with plans for three to leave in 2025/26. Active
care planning is in place to support alternative family-based care
options including: family group decision making; kinship care;
support for families out of hours; and therapeutic supports from
speech and language therapy and psychology. Notwithstanding,
there is likely to be a continued need for residential
accommodation for children during 2025/26.
• A Youth Housing Panel was established to support care-
experienced young people who are moving into independent
living. Meeting monthly, the panel matches individuals to suitable
accommodation based on skills and needs, working with
partners including ROCK Trust and YMCA. Around 10 care
leavers are expected to benefit annually, with consideration of
extending this to other young people with complex needs.
• As a council of sanctuary, we continue to support reducing
demand for resettlement activity and people seeking asylum
placed here by the home office. Some individuals who have
been granted refugee or humanitarian protection status may
choose to make homelessness applications in Perth and Kinross
• In response to the National Housing Emergency, we reduced
average re-let times from 37.8 days in 2023/24 to 24.87 days in
2024/25 and cut the number of void properties from 136 to 95.
Improvements were achieved by deferring non-essential
upgrades, simplifying compliance checks, and offering flexible
decoration options – despite national challenges such as skilled
labour shortages, rising material costs, and delays in utility
connections. 
• To maintain progress, we introduced bulk material purchasing,
launched recruitment initiatives, hired six modern apprentices,
and partnered with Energy Angels to address utility delays -
ensuring homes are delivered quickly and sustainably
• A dedicated Housing Condition Team was established to tackle
condensation, mould, and damp (CMD) in response to Awaab’s
Law and new Scottish Housing Regulator indicators. We
expanded our Housing Internet of Things (IoT) project by
installing air quality sensors in over 440 homes to monitor
temperature, humidity, and CO₂ levels in real time. This supports
early identification of issues and encourages tenants to report
problems at the right time, with staff training and tenant
engagement helping to improve outcomes. 
CASE STUDY
Youth Housing Support Group brings together providers of
housing support with key teams in Housing and Children’s
services.  Support provided matches young people with more
appropriate accommodation. 
Page 60 of 396

Page 61

38 
PKC - GENERAL
Action: Prepare for the establishment of the
National Care Service and continue to strive for
excellent health and social care outcomes for the
people of Perth and Kinross 
The Scottish Government has revised its approach and through the
Care Reform (Scotland Bill) will retain key policy commitments such
as Anne’s Law, the establishment of a National Social Work Agency
and improved support for unpaid carers, while no longer pursuing
the transfer of adult social care responsibilities from local
authorities.
Action: Work with partners to reduce re-offending
and support effective interventions for people in the
justice system 
Through trauma-informed practice, coordinated release planning,
and community-based interventions we are working together to help
individuals rebuild their lives and to reduce the impact of offending
on families and communities.
We trialled the trauma informed group work programme Connectere
within our men’s service. Following positive feedback from the first
group (six completions), eight staff were trained to deliver the
programme inhouse. Two further cohorts were completed in 2024
with eight participants and positive feedback on impact and group
progress. 
“I enjoyed finally getting help for issues that have been
lifelong. Also finding out that I am not alone in my issues.”
– Connectere participant
“The most beneficial session was the session on self-
compassion. I don’t think I would have improved without it,
I think it is something everyone should learn.” –
Connectere participant
• A small test of change to improve co-ordinated support to Perth
and Kinross residents leaving prison on short-term releases was
expanded from two prisons to any Scottish prison in June 2024.
The approach brings together partners from several teams and
agencies to discuss individual support needs and provide an
effective offer of support to people leaving prison. A total of 47
people (40 males and 7 females) were considered during
2024/25 and 32 (68%) signed up for the support offered. 
This work will be expanded further in 2025-26 bringing all
releases into the co-ordination meeting (Short-term Sentence,
Long-term Sentence and Remand). A Young Person’s Steering
Group was established at Perth Academy, involving seven young
people affected by family contact with the justice system.
Supported by Families Outside, the group helped develop youth-
focused resources for the Child Impact Assessment project. In
early 2025, the group evolved into a peer support model, offering
fun and meaningful activities and some respite from the school
environment. Learning from this group support expanding this
model into other schools. 
• Our Community Justice Service (CJS) took part in a Care
Inspectorate self-evaluation activity focused on measuring and
reporting performance, quality and outcomes for people on
community-based sentences. Perth and Kinross was one of the
areas which received onsite. Strengths included a
demonstratable capacity for improvement as evidenced by
numerous focussed Strategic Needs and Strengths Assessment
and work to align activity to the National Strategy for Community
Justice.  Areas for development included development of a
Performance Framework and Dashboard and a Quality
Assurance Framework.
Page 61 of 396

Page 62

39 
PKC - GENERAL
• Hillcrest Futures employed a peer worker at HMP Perth to
deliver harm reduction and recovery activities. There are 321
groups providing activities with 2,658 attendances, and 301
received one-to-one support. This work is delivered in
partnership with the Scottish Prison Service.   
CASE STUDY
Child Impact Assessment Project supports children and
young people with a parent in contact with the justice system
to be seen, heard and supported through the provision of
widespread training for professionals and raising awareness of
the Child Impact Assessment Toolkit.
Areas of Focus
• Take a partnership approach to the assessment of risk of
significant harm to a child and minimising and reducing risk
through early support and assessment.
• Enhance our housing support offer by implementing an
Intensive Housing Support Service for people with complex
needs.
• Where children cannot remain living at home, every effort is
made to keep them within their kin network. 
• Maintain significant relationships for care experienced children
to deliver on the principles of The Promise. 
Links to other Performance Information
➢ IJB Annual Performance Report 2024/2025
Page 62 of 396

Page 63

40 
PKC - GENERAL
Key Performance Indicators related to this priority:
Data will be indicative of performance and should be considered in the context of the current operating environment and level of influence.
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
21/22 22/23 23/24 24/25  Annual
Change
Target
Met/Not
Met
Target
Ensure we
quickly
identify
children,
young
people and
adults at
risk of harm
and abuse
and take the
necessary
actions to
keep them
safe.
(Children
and young
people) 
Percentage of
children on
child protection
register over 12
months 
Control 8% 4% 6% N/A

N/A
(not
appropriate
to set
targets) 
N/A Most child protection registrations last less than a year,
with registrations of 12 months or more remaining low.
This follows a peak of 28% in 2020/21 linked to the
impact of COVID-19. Children and young people who
remain on the register longer often have multiple and/or
complex needs requiring coordinated support.
Registrations now follow the revised National Child
Protection Guidance (2021, revised 2023), with
minimum duration of six months. 
Note:  Children are removed from the register when
risks have been mitigated and there has been an
improvement in relation to the circumstances that led to
them being registered in the first place. 
Rate of children
on the child
protection
register per
10,000 children 
Control 21 20 19  N/A
N/A
(not
appropriate
to set
targets) 
N/A Data for 2024-2025 not available until publication of
LGBF. Information is based upon most recent data
published 
23/24 Scottish Average is 23.8 
Calculated using 2022 Mid-Year Estimates (MYE)
Population (0-15) figures until updated figures are
published, in line with national approach. Child
Protection registrations in Perth and Kinross remain in
line with the national average rate (from 2022) of 20 per
10,000 population. This reduction reflects significant
investment in consistent chairing of case conferences
and earlier use of Child and Young Person’s Plans,
helping reduce the need for case conference and
registration by working collaboratively with families.
Page 63 of 396

Page 64

41 
PKC - GENERAL
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
21/22 22/23 23/24 24/25  Annual
Change
Target
Met/Not
Met
Target
Ensure we
quickly
identify
children,
young
people and
adults at
risk of harm
and abuse
and take the
necessary
actions to
keep them
safe.
(Adults) 
Number of
Vulnerable
Person Reports
received 
Influence 1,755 2,254 2,262 2,255
N/A
(not
appropriate
to set
targets) 
N/A In 2024/25, 2,255 Vulnerable Person Reports (VPRs)
were received – consistent with recent years. The Adult
Protection Committee encourages reporting where
concerns exist, enabling timely intervention. Although
we are seeing a levelling in the VPRs received, national
data shows Perth and Kinross receives more VPRs per
head of population than any other area in Scotland.
This is likely due to strong partnership arrangements
around this area of work.
Percentage of
Adult Support
and Protection
(ASP) Initial
Referral
Discussions
held within
timescale
Control 67% 69% 75% 86%
100%  86% of Adult Initial Referral Discussions (IRDs) were
held within five days of the decision to proceed. Routine
auditing of IRDs ensures timely safeguarding and
accountability and confirm that where IRDs took place
outwith the target of 5 days no adult was left at undue
risk. 
Ensure that
people get
the right
care and
support
where and
when they
need it.
Number of
households
presenting as
homeless 
Influence 610 737 849 861  N/A
(not
appropriate
to set
targets) 
N/A Homelessness presentations increased slightly by 1.4%
in 2024/25. Despite this, our commitment to the ‘Home
First’ approach remains strong. Focused on prevention,
rapid rehousing, and tenancy sustainment, this model
continues to deliver sector-leading outcomes and
person-centred support.
Percentage of
affordable
homes built to
wheelchair and
adaptable
standard (units) 
Control 4.3% 8.9% 10% 11%

10% 
of all
social
housing
built   
Of the 107 affordable homes built in 2024/25, 12 were
adapted properties suitable to meet the needs of older
or ambulant disabled households, including one being
suitable for wheelchair use.
Page 64 of 396

Page 65

42 
PKC - GENERAL 
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
21/22 22/23 23/24 24/25  Annual
Change
Target
Met/Not
Met
Target
Percentage of
adults receiving
any care or
support who
rate it as
excellent or
good 
Influence 77% 73% 70% N/A
(HACE
data
available
25-26)
N/A N/A
(Target
not set)
N/A HSCP no longer uses the Service User Experience
Survey (SUPE). Future reporting will draw on the
Health and Care Experience (HACE) survey data,
available next year. 
As the HSCP implements the newly approved IJB
Performance Framework new measures and targets will
be established to supplement the 2 yearly publication of
HACE data.  Percentage of
adults
supported at
home who
agree that their
services and
support had an
impact in
improving or
maintaining
their quality of
life. 
Influence 76% N/A 76% N/A
(HACE
data
available
25-26)
N/A N/A
(Target
not set)
N/A
Page 65 of 396

Page 66

43 
PKC - GENERAL
Priority: Supporting and promoting
physical and mental wellbeing 
Adult Social Work and Social Care services are delivered through
the Perth and Kinross Health and Social Care Partnership (HSCP),
under the governance of the Integration Joint Board (IJB). The IJB’s
Annual Performance Report 2024-2025 outlines  progress against
the strategic ambitions set out in the IJB’s Strategic Plan 2024-
2027. This section draws on key highlights from the report,
alongside performance information from Council services which are
not delegated to the IJB. 
Action: Work with partners to provide localised
health and social care provision in areas of greatest
need and in those most geographically distant from
services 
By focusing on person-centred services, inclusive activities, and
community-led initiatives, we’re helping people live healthier, more
independent lives closer to home. Key activities contributing to this
in 2024/25 include:
• The Learning Disability and Autism Strategy 2022-2025
continues to drive person-centred support, with progress
reported to the IJB in June 2025.  
• The Scope Team was established in May 2022 and now
supports 367 people which is an 8% increase since March 2024, 
has successfully prevented hospital admissions and assisted
people to return from long-stay hospital care to their community,
in line with the ‘Coming Home’ ambitions. The SCOPE team has
continued to deliver support which is sustaining individuals in
their own homes, reducing the need for admission into hospital
or care provision. There have been no admissions into long stay
hospital in the last 12 months.
• Additionally, the team also provides valuable assistance to
carers of people with complex needs. A new peer support group
for carers has attracted 15 participants, strengthening informal
networks and wellbeing. 
• The ‘Check In Giraffe’ programme delivered over 6,000 hours of
work experience and 3,500 hours of additional support through
301 sessions and 67 different activities – helping people
overcome barriers to employment. 
• Promoting a More Inclusive Society (PAMIS) supported 46
registered families and reached many more through inclusive
community events. In 2024, the team responded to 219
enquiries, held 100 online meetings, and hosted 50 in-person
events. Two digital passports were developed to improve
person-led communication. 
• Stanley Development Trust provided weekly soup and sandwich
clubs to reduce isolation among older residents. In 2024, there
were 496 attendances at the Lunch Club and 280 at Soup Club.
“I have always felt included and valued at Giraffe. People play
different roles in the organisation, but there is no hierarchy of
importance. No one person is more important than another.” –
Check In Giraffe participant
Page 66 of 396

Page 67

44 
PKC - GENERAL
“PAMIS staff consistently go above and beyond to support our
family.”  “PAMIS are always such a great support to me.” –
PAMIS registered users
“Soup and lunch clubs are great value for money and a good
social occasion for older people.” – Stanley Development Trust
feedback
Action: Improve health and wellbeing in Perth and
Kinross by increasing overall participation in sport
and physical activity and promoting the wellbeing
benefits of time spent in our natural surroundings 
Through inclusive programmes, community-led initiatives, and
investment in green spaces, we’re helping people of all ages stay
active, connected, and well. Key activities contributing to this in
2024/25 include:
• We supported Live Active Leisure staff to deliver evidence-based
falls prevention classes. These classes are based on later life
training, postural stability instructor training, and have been
shown to be highly effective in reducing falls among community
dwelling older adults. Over 2,000 Wellbeing Community Classes
were delivered, supporting more than 20,000 individual
attendances. Activities included chair-based social classes,
social circuits, aqua circuits/aerobics, and chair-based yoga.
• The risk of falls increases with age and given the growing older
population in Perth and Kinross, higher admission rates due to
falls are to be expected. This is reflected in the rate of 25
admissions per 1,000 people aged 65 and over in Perth and
Kinross, compared to 23 per 1,000 for Scotland. Despite this,
performance against this indicator remains good, with a marginal
improvement of 1.6% compared to last year
• Seven parks and play areas were enhanced- in Bridge of Earn,
Luncarty, Blairgowrie, Scotlandwell, Greenloaning and Braco –
with design development continuing for a further four in Perth
and Crieff. Each project was shaped through community
consultation to reflect local needs and aspirations.
• The Right Track programme, supporting young people aged 16-
26 on deferred sentences, was recognised with a Butler Trust
Commendation for the Right Track Project Officer.   The
programme and participants continue to feedback positively on
the sense of achievement they gain from participating, noting
they have had the opportunity to learn skills they never thought
were possible for them.  A review was carried out in 2024/25 
and highlighted strong outcomes and identified development
areas, including identifying resilience as a risk. In November
2024, an additional worker was recruited to increase capacity. 
CASE STUDY
During the 2024 Olympics, 20 care homes and three day
centres took part in the annual Go4Gold challenge, with
residents and service users taking part in physical and
wellbeing challenges in their own setting. The event, jointly
facilitated by the HSCP and Scottish Care, celebrated
participation and community spirit. 
Page 67 of 396

Page 68

45 
PKC - GENERAL
CASE STUDY
Girls for Change: Get Active, Get Confident brought
together 40 pupils from across Perth and Kinross for a day of
workshops and fitness sessions aimed at building confidence
and promoting physical activity. Held at Dewars Centre, the
event tackled body image, exercise myths, and gender
inequalities. Inspired by the day, pupils at Bertha Park High
School launched an “Into Exercise” project to support peers
disengaged from PE. Early results show promising
improvements in participation and wellbeing. 
Action: Improve health and wellbeing in Perth and
Kinross by ensuring that people have access to
wellbeing support when they need it 
Through integrated care, dementia support, technology-enabled
services and targeted help for unpaid carers, we’re improving health
outcomes and supporting people to live well in their communities.
Key activities contributing to this in 2024/2025 include:
• Between April 2024 and February 2025, 113 people were
supported by local integrated care services to remain at home
and avoid crisis placements or hospital admissions service,
helping shift the balance of care. 
• In Perth city, the integrated hub is now fully established, enabling
rapid, multi-disciplinary responses when health deteriorates.
Urgent care Advanced Nurse Practitioners are working with
locality teams to expand this model across the region.
• Dementia support has grown through Alzheimer Scotland’s Brain
Health Centre and dementia cafés. In 2024, 275 referrals were
made for Post Diagnostic Support (PDS), with 279 people
receiving support by December – an increase of 12% from
January.
• The Community Alarm service handled 260,911 calls in
2024/2025, with 99.26% answered within 60 seconds - up from
98.83% the previous year. The service now supports over 3,900
clients and 12,000 devices, helping people stay safe and
independent at home.
• In 2024/2025, 692 unpaid adult carers received tailored support
through statutory services, including day centres, sitting services,
and respite. These services offer carers essential breaks to help
maintain their own wellbeing. Additionally, 166 carers benefited
from donated Respitality breaks, 252 were referred to Live
Active for wellbeing support, and 472 received grants under the
Time to Live Scheme.
• PKAVS Carers’ Centre was awarded the Carers’ Trust for
Carers’ Quality Award, recognising its commitment to
outstanding service delivery. The centre had 1,622 adult carers
registered this year - a 15% increase since June 2024. The
Carers’ Centre delivered the following supports to carers in
2024-2025.
• Carers have a higher risk of financial exclusion. In 2024/2025,
847 unpaid carers received support from Citizens’ Advice, mainly
with debt and energy advice -a 40% increase from the previous
year. We are working with partners and internal teams to identify
those in need and ensure they are signposted to appropriate
support.
• Since January 2024, all Inpatient Mental Health and Learning
Disabilities Services in Tayside have been using SafeCare to
reflect real time staffing visibility, red flags and associated
mitigations and professional judgement
• One of our key learning objectives this year across the Mental
Health Service family has been further enhancement of staff
knowledge of Adult Support and Protection particularly for Senior
Charge Nurses, Team Leaders, Clinical and Professional Team
Managers, Integrated Managers and Service Managers. The
Service have been working proactively with both Perth and
Kinross Council and NHS Adult Protection Teams to progress
Page 68 of 396

Page 69

46 
PKC - GENERAL
this with two half day events delivered engagement with the
Police Scotland Public Protection Unit and engagement with the
Scottish Fire and Rescue Service for fire safety.
Areas of Focus
• Improve health and wellbeing in Perth and Kinross by increasing
overall participation in sport and physical activity and promoting
the wellbeing benefits of time spent in our natural surroundings
• Improve health and wellbeing in Perth and Kinross by ensuring
that people have access to wellbeing support when they need it 
Links to other Performance Information
➢ Community Justice Progress Report 2023-24 (Item 5)
➢ Joint Carers Strategy 2023 to 2026
➢ IJB Annual Performance Report 2024/2025
Page 69 of 396

Page 70

47 
PKC - GENERAL
Key Performance Indicators related to this priority
Data will be indicative of performance and should be considered in the context of the current operating environment and level of influence.
Key Actions
(summary) Indicator Control /
Influence
Performance Comments
21/22 22/23 23/24 24/25  Annual
Change
Target
Target:
Met/Not
Met 
Improve
health and
wellbeing in
Perth and
Kinross by
increasing
overall
participation
in sport and
physical
activity and
promoting the
wellbeing
benefits of
time spent in
our natural
surroundings
Number and
percentage of the
total school roll
(primary and
secondary)
participating in
Active Schools/
School Sports
Influence 5,190
29%
7,200
39%
7,776
42%
7,859
43% 
43%    Participation in extra-curricular sport
activities has continued to rise, with 38% of
secondary school pupils involved in extra-
curricular clubs – placing Perth and Kinross
in the top three local authorities in Scotland.
Number of
attendances at
pools, indoor and
outdoor sports and
leisure facilities
and programmes
(thousands)
Influence 564K 1.002M 1.116M 951K 1.013m  Attendance at Live Active Leisure venues
fluctuated due to the closure of Bells Sports
Centre following flooding. Q1 saw 241,577
visits. Q2 dropped to 212,967 (-12%) with
the quieter summer period, before rising
slightly in Q3 to 220,490 (+3.5%). In Q4,
following the successful relocation of the
gym to Dewars Centre, attendance rose to
275,545 (+25%) driven by higher gym
memberships and overall attendance, plus
increased use of classes and sports halls
across other venues in Perth and Kinross.
Percentage of
residents satisfied
with local leisure
facilities
Influence 74%
(2019-
2022)
73%
(2020-
2023)
75%
(2021-
2024)
N/A

70% N/A 
(Target
set but
data not
yet
available)
Data for 2024-2025 not available until
publication of LGBF. Information is
based upon most recent data published.
Latest figures indicate a 2% increase
compared to previous and are above the
national average of 67%.
Page 70 of 396

Page 71

48 
PKC - GENERAL
Key Actions
(summary) Indicator Control /
Influence
Performance Comments
21/22 22/23 23/24 24/25  Annual
Change
Target
Target:
Met/Not
Met 
Percentage of
adults satisfied
with parks and
open spaces 
Control 90%
(2019-
2022)
91%
(2020-
2023)
89.7%
(2021-
2024)
N/A 

N/A
(Target
Not Set)
N/A Data for 2024-2025 not available until
publication of LGBF. Information is
based upon most recent data published.
Satisfaction with parks and open spaces
remains high at 89.7% (2021-24), slightly
down from 91.3% in 2020-23 but still above
the national average of 85%. 
Improve health
and wellbeing in
Perth and
Kinross by
ensuring that
people have
access to
wellbeing
support when
they need it 
Mental Health -
Reduction in
waiting times for
people to access
Mental Health
Services (weeks)
Influence 33 36 39 42       N/A
(Target
Not Set)
N/A The increase in waiting times is attributed to
unprecedented referral levels, increased
awareness and prevalence of Mental Health
conditions, and more people seeking neuro-
diversity assessments (such as ASD and
ADHD). Community Mental Health Teams
are focused on complex cases, resulting in
many referrals being rejected or waitlisted,
while alternative services are also at
capacity.
A new Model of Care is being developed
across Tayside, aiming to implement a
single point of referral and triage system to
reduce waiting lists and improve timely
access.
Percentage
increase in people
who feel that their
health and social
care support was
easily accessible
and well
communicated
Influence 80% 89% 57% N/A
(HACE
data
availabl
e 25-
26)
N/A N/A
(Target
Not Set)
N/A HSCP no longer uses the Service User
Experience Survey (SUPE). Future reporting
will use data from the HACE survey,
available next year.  As the HSCP
implements the newly approved IJB
Performance Framework new measures and
targets will be established to supplement the
2 yearly publication of HACE data.
Page 71 of 396

Page 72

49 
PKC - GENERAL
Priority: Working in partnership with
communities 
We recognise that there is no one-size fits all solution to working
with communities to address local needs. In 2024/25 we have
tested and operated different approaches. Some of the progress
made is outlined below. 
Action: Establish locality multidisciplinary teams
working with our community planning partners and
residents to identify and address local solutions to
local needs 
In 2024/25, we expanded our multidisciplinary approach to tackling
poverty and inequality across Perth and Kinross, supported by
Scottish Government funding through the Fairer Futures Fund. Our
Fairer Futures project is a placed based and data driven approach
to identifying and addressing communities of highest need within
Perth and Kinross and then delivering a multi-disciplinary holistic
approach in partnership with those communities.
By deepening local engagement, strengthening service
coordination, and enhancing community resilience, we are building
a more inclusive and responsive support system tailored to the
needs of our most vulnerable communities. Key activities
contributing to this in 2024/25 include: 
• Secured Fairer Futures funding support to scale up our
multidisciplinary approach, appointing a programme manager
and recruiting a dedicated project team to lead delivery in new
priority localities: Rattray, South Crieff, and Muirton, alongside
existing pilots in Letham, Highland, and Coupar Angus.
• Advanced the Letham Action Plan by bringing additional
services into the hub, commissioning youth work from YMCA,
and conducting further community consultation.
• Reviewed the Coupar Angus Action Plan and provided targeted
support to the Strathmore Hub to develop a sustainable
operating model.
• Engaged with communities in Highland through consultation
sessions in Aberfeldy, Pitlochry, and Kinloch Rannoch to inform
future planning.
• Strengthened local coordination by consolidating Community
Support and Enforcement services, with new leadership roles
enabling more effective collaboration between specialist and
locality-based teams.
• Supported a record 65 community groups—exceeding our
target of 60—to establish Community Resilience Groups using
ringfenced Council funding, enhancing emergency
preparedness and response, as demonstrated during severe
weather events.
• Delivered targeted enforcement actions, including Operation
Anvil, which improved public safety and consumer protection
through successful interventions such as the seizure of
counterfeit tobacco and the issuing of a significant fine. 
CASE STUDY
A Community Outreach Programme initiated to support the
prevention of fraud and scams amongst vulnerable people. 
The programme visits various community groups and engages
with residents providing advice on scams whilst assessing if
individuals require further support. 
Page 72 of 396

Page 73

50 
PKC - GENERAL
Action: Increase the supply and availability of rural
housing 
Our efforts focus on securing long-term tenancies, prioritising local
connections, and strengthening collaboration with key partners to
deliver sustainable housing solutions. Key activities contributing to
this in 2024/25 include:
• We acquired 20 residential properties in Dunkeld from the
National Trust for Scotland (NTS), enabling 20 households to
transition into secure Council tenancies and increasing access to
affordable housing in the area. 
• We worked closely with NTS and tenants to ensure a smooth
transition, providing responsive support throughout the handover
process. 
• We introduced a local lettings policy that prioritises future
allocations for individuals with strong ties to the Dunkeld area,
reinforcing our commitment to the principle of “local homes for
local people. 
Action: Develop and expand our approach to
working with communities to identify local actions
and priorities and deliver on these together
We are deepening our partnership with communities by co-
designing local solutions, investing in inclusive spaces, and
empowering residents to shape decisions that matter to them. Our
approach is rooted in trust, transparency and shared ownership,
ensuring that local priorities drive meaningful change. Key activities
contributing to this in 2024/25 include:
• The development of new chalets at Double Dykes – phased
occupation of which began in May 2025 - represents part of our
wider investment in high-quality, culturally appropriate
accommodation for Gypsy/Traveller communities. We introduced
a resident-led engagement model shaped by direct feedback,
including regular on-site sessions, digital participation via
Microsoft Teams, tailored newsletters, and real-time updates
through noticeboards - strengthening trust and empowering
residents to play an active role in shaping their living
environments.
• Through our Warm Welcome Initiative, we allocated over
£200,000 to more than 100 community groups to create warm,
welcoming spaces during winter. Co-design workshops led to a
34% increase in overall attendances (45,336), a 36% increase in
unique attendees (6,156), and a 67% boost in volunteer
participation (835 volunteers). Warm Welcome Evaluation Report
24/25
• We allocated £100,000 through our Locality Participatory
Budgeting Fund to 28 community groups in areas facing the
greatest socio-economic challenges. Residents voted on
proposals tackling poverty, cost of living, and volunteer
development, with 2,516 votes cast – a 23% increase from last
year. Children and young people played a key role, with 799
aged 5-17 actively involved. 
• We supported 118 volunteer groups who contributed 40,000
hours to enhancing greenspace management. Despite reduced
funding, we provided insurance, training, materials, and, in some
cases, financial support, helping enhance local spaces and
community pride.
• We consulted communities on the design of 11 play areas,
receiving 486 responses. Workshops with schools ensured
children’s voices were heard, resulting in inclusive,
multifunctional designs that reflect local aspirations. 
• We contributed £0.5 million towards new changing facilities at
Davie Park, led by Blairgowrie and Rattray Community Football
Club - demonstrating the impact of joint investment in
community-led infrastructure. 
Page 73 of 396

Page 74

51 
PKC - GENERAL
• We updated our Equality aims and outcomes for 2025 to 2029
clear actions to promote fairness, inclusion, and opportunity for
all. Further details are provided in the Perth and Kinross Council
Equality and Perth & Kinross Council Equalities Mainstreaming
Report 2023-25. 
Action: Deliver our internal cultural change
programme ensuring all staff contribute to our
commitment to engage with and be accessible and
responsive to our residents and communities 
• We launched our Leadership Competency Framework, setting
out the actions and behaviours expected of all our teams to help
us deliver our organisational vision and strategic outcomes and
work effectively with communities.
• We revised our leadership model and introduced the Five
Foundations of Leadership to support cultural change and
improve how we engage with residents. This model will be
central to future leadership development activity.
• We adopted a new Performance and Development Discussion
(PDD) Framework making it mandatory for all staff in early
2025. It includes structured prompts to encourage meaningful
conversations about delivering better outcomes for people and
communities. All annual PDDs are recorded in our HR system
to support analysis and future organisational development
planning.
• We developed a Leadership and Manager Induction Toolkit as
part wider support for new managers in understanding their role
and responsibilities, including how they contribute to shaping
our culture. This guide, along with enhanced induction
processes, will be launched in 2025/26. 
Areas of Focus
• Scale up and roll out of Fairer Futures programme to Rattray,
South Crieff, Muirton and North Muirton.
• Develop updated locality profiles to support a needs-based
approach. 
• Support delivery of Business Improvement, Culture and
Behaviours and Workforce Planning workstreams of the
Leadership Development Phase 2 Transformation Project.
• Implement the newly developed Leadership and Managers
Induction toolkit. 
Links to other Performance Information
➢ People and Culture Strategy Action Plan
➢ Perth & Kinross Council Equalities Mainstreaming Report
2023-25. 
➢ Community Empowerment Annual Report 24-25 (Item 8)
➢ Locality PB Fund 24/25 - Funding Awards
➢ Community Investment and Local Action Partnership
Funds 2024/25 (Item 10) 
CASE STUDY
Parapet Repairs at Bridge of Cally were carried out following
storm damage in December 2023, with climate resilience built
into the design. A key moment came when a local resident
shared historical photos showing the bridge once had flood
chutes—prompting Perth & Kinross Council to reinstate them
as part of the repair. This community insight helped shape a
more effective and contextually appropriate solution. Combined
with drainage improvements and collaboration with
landowners, the works have successfully prevented further
flooding and strengthened local engagement in infrastructure
planning.
Page 74 of 396

Page 75

52 
PKC - GENERAL
Key Performance Indicators related to this priority
Data will be indicative of performance and should be considered in the context of the current operating environment and level of influence.
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
21/22 22/23 23/24 24/25 Annual
Change  Target
Target:
Met/
Not Met
Increase the
supply and
availability of
rural housing
Total number of
houses built in rural
areas of Perth and
Kinross 
Influence 55 63 111 113

60    This includes 29 buybacks, 66 new builds, and 18
purchases from National Trust Scotland in
Dunkeld. 
Number of
Community
Development
Trusts supported to
increase the
availability of rural
housing 
Control N/A New
Indicator,
baseline to
be
established
and targets
set
thereafter
3 4 4

4 We are actively supporting four community
development trusts to explore community-led
affordable housing initiatives. Current projects
include: 
• refurbishment of two flats in Aberfeldy 
• planning permission in progress for 12 new
affordable homes in Kinloch Rannoch and
10 new affordable homes in Aberfeldy 
• negotiations to purchase three flats for mid-
market rent in Aberfeldy 
• a feasibility study to convert Blair Atholl’s
former rail station into three affordable
homes
Develop and
expand our
approach to
working with
communities 
Number of
community groups
with local resilience
plans 
Influence 26 28 53 65

60    The number of Community Resilience Groups
rose from 53 to 65 in 2024/25 - a 22.6% increase
– thanks to targeted funding awarded in the
Council budget, which enabled tailored support
from our Community Support and Enforcement
team. These groups played a vital role during
recent weather events, supporting local residents
and maintaining essential services. 
Page 75 of 396

Page 76

53 
PKC - GENERAL
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
21/22 22/23 23/24 24/25 Annual
Change  Target
Target:
Met/
Not Met   
Control
Number of
communit
y groups
supported
to
increase
their
capacity 
236 343 258 110  270  In 2024/25, 110 community groups received
support—of which 91 were new to the service.
This highlights the team’s growing role in
building the capacity of emerging and less-
established groups, helping them to develop
skills, confidence, and sustainability for the
future.
It is to be noted that we have strengthened our
reporting processes to ensure greater accuracy.
Previously, we counted the number of times a
community group was supported. Under the new
method, we count the number of individual
community groups supported. This change
provides a more reliable picture of the support
being delivered. While it may result in a lower
overall figure being reported, it better reflects the
breadth of our engagement.
Future targets will be revised to align with this
updated reporting approach.
Number of
community groups
supported in the
asset transfer
process 
Influence 7 26 31 34

25    We supported 34 community groups who
expressed interest in Community Asset Transfer
(CAT), offering a single point of contact and clear
asset information. Sixteen groups are still actively
considering the process, with several expected to
progress to Stage 2 within the next year. Others
have found alternative solutions that better suit
their needs. 
Number of groups
receiving community
investment funding 
Control 141 85 104 115

110    CIF award numbers will vary year on year
depending on the projects that ward panels chose
to support. In 2024/25, we received 161
applications - up from 110 the previous year - and
distributed £326,383 between 115 groups, an
increase of 11.
Page 76 of 396

Page 77

54 
PKC - GENERAL
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
21/22 22/23 23/24 24/25 Annual
Change  Target
Target:
Met/
Not Met
Number of
participation
requests 
Influence 0 0 0 2


N/A
(not
appropria
te to set
targets) 
N/A We received two participation requests. One,
related to a proposed rural library closure, was
accepted but did not progress as the library
remained open. The second was declined due to
timing, but we committed to working with the
community when it is time to progress the
outcomes with which they are concerned.
Note: Participation Requests (PRs), introduced
under the Community Empowerment Act, provide
a legal safeguard for community groups seeking
greater involvement in decision-making and
service delivery. An increase in PRs may indicate
growing community confidence and capacity—a
positive sign—or highlight shortcomings in initial
Council engagement, which would be a concern. 
Page 77 of 396

Page 78

55 
PKC - GENERAL
Key contact
For further information on any area of this report please contact the Strategic Planning, Performance and Risk Team
stratplanperform@pkc.gov.uk. 
Disclaimer: All hyperlinks correct at time of publication 
Page 78 of 396

Page 79

Appendix 2 
A Perth and Kinross where everyone can live life well,
free from poverty and inequalities
5
Page 79 of 396

Page 80

Executive Summary: Annual Performance Report 2024/25
2
Annual Performance Report 2024/25
Executive Summary 
Page 80 of 396

Page 81

Corporate Annual Performance Report 2022/23
3
Executive summary
This Executive Summary uses information from the Key
Performance Indicators (KPIs) in the Corporate Plan to give an
overview of where we are performing well compared to the previous
year’s data, or where there has been a decline in performance.
This is intended to offer an ‘at a glance’ summary of our
performance. However, to fully understand the context and the
wider activity being undertaken to support our key priorities it is
important to read the full Annual Performance Report. 
Overview of KPI trends
The tables within the full APR provide an overview of changes in
performance within the KPI data between 2023/24 and 2024/25, or
the most recent year available. 
Of these, 61% are moving in a favourable direction, 22% in an
unfavourable direction, 9% remain static and 8% are either not
available or not it’s not appropriate to make a comparison. When
comparing this to last year, there is a slight increase in the
percentage of indicators trending in a favourable direction. This can
particularly be seen in our priorities around tackling climate change
and developing the economy.
Caution should be applied when interpreting this data, as these are
only indicative of performance. Changes in performance should be
considered in the context of the current operating environment,
challenges and whether we control, influence or are informed by the
data. 
Communities
Physical and Mental Wellbeing
Protect and Care
Children and Young People
Economy
Tackling Climate Change
Tackling Poverty
5
2
4
3
7
7
5
1
2
1
4
3
1
1
1
1
2
1
2
1
KPI TREND OVERVIEW
Favourable Change Unfavourable Change Static N/A
Page 81 of 396

Page 82

Executive Summary: Annual Performance Report 2024/25
4
Overview of challenges and highlights
Tackling poverty 
Prevent and mitigate the impacts of poverty for children living
in Perth and Kinross: Perth and Kinross have made encouraging
progress in reducing child poverty, with local rates now 3.8% below
the national average - almost double the previous gap - and ranking
seventh nationally. This progress is attributed to coordinated efforts
in 2024/25, including holistic family support, strategic employability
initiatives, and targeted programmes like Support and Connect and
Future for Families, which engaged with 238 families over the
course of the year. We also allocated over £82,500 to support
holiday food for school children and 70 children benefited from free
places at the Fuelled for Fun holiday programme. Initiatives
undertaken helped parents into work, provided digital access, and
improved family access to sources of support. Despite housing
pressures, our ‘Home First’ approach maintained stability in
temporary accommodation, contrasting with a national rise. 
Mitigate Cost of Living Pressures for Households Experiencing
or at Risk of Poverty: Efforts to mitigate the effects of poverty
continue to be a priority in Perth and Kinross. Key initiatives
included The Financial Inclusion Project, in partnership with
Citizens’ Advice Bureau, delivering £784,052 in financial gains and
supporting 677 tenants in arrears. In 2024/25, 564 tenants received
£203,000 in financial assistance through the Tenancy Sustainment
Fund, helping them manage arrears and maintain stable housing.
Current and gross rent arrears reduced, highlighting the
effectiveness of our integrated support model. 
Maximise Income from Benefit Entitlement and Concessions
for Households Experiencing or at Risk of Poverty: In 2024/25,
we strengthened our efforts to help residents increase their income
through benefits and financial support. Our Welfare Rights service
secured £9.2 million in additional benefits for residents, driven by
improved service promotion and follow-up. We distributed £269,000
to over 1,400 households through the Financial Insecurity Fund,
with a strong focus on rural communities and those without
recourse to public funds. National recognition came in October
2024 when the Welfare Rights and Welfare Fund teams won the
Excellence in Social Inclusion Performance Award for their work in
prisons and foodbanks. Access to services was expanded through
targeted outreach, including regular engagement at Double Dykes
and collaboration with Broke Not Broken to support Gypsy/Traveller
communities. A six-month outreach programme at @Scott Street
improved referral rates and enabled Social Work teams to adopt
online referrals. Partnerships with YMCA and Creative Exchange
provided tailored welfare rights support for young people aged 16–
25. Additionally, a weekly Welfare Fund outreach service in HMP
Perth supported over 90 prisoners preparing for release.
Promote and Encourage Local Employers to Follow the
Principles of the Scottish Government Fair Work Action Plan:
Perth and Kinross Council continues to champion the Scottish
Promote and encourage principles of the
Scottish Government Fair Work Action Plan
Maximise income from benefits and
concessions
Mitigate cost of living pressures for households
experiencing and at risk of poverty
Prevent and mitigate the impacts of poverty for
children
1
2
1
1
1
1
KPI TREND OVERVIEW
Favourable Change Unfavourable Change Static N/A
Page 82 of 396

Page 83

Executive Summary: Annual Performance Report 2024/25
5
Government’s Fair Work Action Plan by embedding fair work
practices and promoting them among local employers. All
businesses receiving Council grant funding are required to pay the
Real Living Wage, and the Council ensured all its employees,
including apprentices, receive fair pay. Targeted incentives
supported local employers in recruiting for roles that paid the Real
Living Wage. Through the Futures for All Employer Recruitment
Incentive, financial and employability support was provided to 48
businesses—20 in Perth and 28 in rural areas—with all new recruits
(excluding apprentices) receiving the living wage. 
Page 83 of 396

Page 84

Executive Summary: Annual Performance Report 2024/25
6
Tackling climate change and supporting
greener sustainable places 
Support the prioritisation of sustainable, cleaner and greener
transport in line with the National and Regional Transport
Strategies: The Council has supported Community Transport
Groups through forums and direct liaison, investing in Multi-Purpose
Vehicles for long-term loans. Elected members approved
transferring Council minibuses to Community Groups at end of their
Council life. A scheme providing free bus travel on the first Saturday
of each month continued from June 2024 to March 2025, for
passengers who do not hold a free bus pass. A total of 38,042
passengers benefited from this offer and encouraged use of public
transport. 
Improve the energy efficiency of our Council housing stock
and public buildings and encourage our partners and private
householders to consider where they can make improvements:
In 2024/25, the Council made significant progress in improving
energy efficiency and supporting low-carbon living. We delivered
new energy-efficient housing, upgraded existing stock, and enabled
private homeowners to access funding. Key activities included
completing 37 new affordable social rent homes, prioritising energy
efficiency improvements for homes with Energy Performance
Certificate Bands E and F, upgrading 440 properties to meet
Energy Efficiency Standards for Social Housing, beginning a £6.5m
refurbishment at the Double Dykes Gypsy Traveller site, supporting
private homeowners to improve energy efficiency of their properties,
and providing free home energy advice to 1,638 households.
To conserve and enhance the biodiversity of our natural
environment: The Council made strong progress in protecting and
improving biodiversity, focusing on tree planting, habitat restoration,
community engagement, and targeted ecological improvements.
Key activities included planting 3,142 trees, supporting the Grow
Wild initiative, conducting targeted biodiversity work, enhancing
ponds, awarding 16 Nature Restoration Fund (NRF) grants, and
empowering council teams and community groups to make lasting
improvements for nature.
To adapt to and mitigate the impact of climate change on the
way we operate: Perth and Kinross is actively addressing the
impacts of climate change through a range of practical measures
aimed at building resilience and supporting a circular economy.
In 2024/25, the Council advanced flood risk management by
completing the Perth Surface Water Flood Study and initiating plans
in Bridge of Earn, Comrie, and Scone, while progressing and
undertaking preparatory work and data collation for design in other
areas. Construction of the Comrie Flood Protection Scheme is
underway and on budget, with the South Kinross scheme moving
To adapt to and mitigate the impact of climate
changes on the way we operate
To conserve and enhance the biodiversity of our
natural environment
Improve the energy efficiency of our buildings,
and encourage our partners and private
householders to consider improvements
Support the prioritisation of sustainable,
cleaner, and greener transport
2
1
2
2
KPI TREND OVERVIEW
Favourable Change Unfavourable Change Static N/A
Page 84 of 396

Page 85

Executive Summary: Annual Performance Report 2024/25
7
forward through formal notification and a scheduled hearing. A
dedicated Watercourse Inspector team replaced seasonal support
and £4.7 million has been invested in flood-related capital and
revenue projects to reduce flood risk and support essential works.
Waste reduction efforts included a mattress reuse initiative with
PUSH, diverting items from incineration and creating jobs.
Following introduction of a new twin-stream collection system,
figures continue to indicate increased household recycling rates, as
well as generated additional income from separated recyclables. 
Page 85 of 396

Page 86

Executive Summary: Annual Performance Report 2024/25
8
Developing a resilient, stronger and greener
local economy 
Support and promote business growth, business and place
innovation and investment in both our urban and rural
areas: In 2024/25, the Council enhanced support for business
growth and innovation in Perth and Kinross, focusing on start-ups,
rural enterprises, digital industries, and inward investment. We
supported 252 business start-ups, led the Tayside region in
Business Gateway Growth referrals, and provided tailored support
to 254 micro-enterprises, self-employed individuals, and social
enterprises. We also expanded Perthshire Artisans to support
creative sector businesses, designed the first phase of the Perth
Eco-Innovation Park, and launched a new Customer Relationship
Management system to improve business interaction tracking. 
Invest in innovative green power and smart technology
solutions to reduce reliance on electricity from the national
grid and create opportunities for business growth and
regeneration: The Council has continued to reduce its reliance on
the national grid by investing in low-carbon energy and smart
technology, supporting sustainability and local economic growth. In
2024/25, the Council progressed two major clean energy projects,
installed a medium-scale heat pump system at a rural primary
school, and explored new partnerships to expand solar power and
battery storage. 
Promote what our city and towns have to offer to businesses,
investors and tourists by capitalising on built and natural
heritage and assets such as the new Perth Museum and the
benefits to the whole area of Perth’s status as UNESCO City of
Craft and Folk Art: In 2024/25, Perth and Kinross Council
positioned Perth and Kinross as a vibrant destination for business,
investment, and tourism by leveraging our cultural identity, natural
assets, and UNESCO status. The Council promoted the area as a
dynamic destination, delivered high-impact creative projects, grew
the Perth City & Towns platform, and achieved a marked increase
in visitor numbers and the tourism sector’s economic impact. We
also strengthened cultural tourism and regeneration through
strategic promotion and investment, including the opening of the
new Perth Museum.
Support individuals into work and to progress into better paid
work, encouraging businesses to access initiatives to create
new opportunities for those furthest from the employment
market and those currently in low wage jobs: In 2024/25, the
Council supported 618 adults to achieve learning outcomes,
awarded £92,000 to support local organisations through the Adult
Learning in the Community Fund. We launched employability drop-
ins, supported unemployed clients through the Skills Passport
project, 58 unemployed clients gained awards and 21 now in work
or self-employed. 
Support people into work and encourage
business to access initiatives to create new…
Promote what our city and towns have to offer to
businesses, investors and tourists
Invest in innovative green power and smart
technology solutions
Support and promote business growth and
investment
1
1
1
4
1
1
1
KPI TREND OVERVIEW
Favourable Change Unfavourable Change Static N/A
Page 86 of 396

Page 87

Executive Summary: Annual Performance Report 2024/25
9
We registered 140 new young people with our Youth Employability
Team, 122 completed support – 94% of whom moved into a
positive destination.  
Page 87 of 396

Page 88

Executive Summary: Annual Performance Report 2024/25
10
Enabling our children and young people to
achieve their full potential 
Ensure inclusive and quality education for all and promote
lifelong learning: The Council is using data and focusing on equity
to drive meaningful improvements in schools and early years
settings, helping children and young people reach their full
potential.  A National Thematic Inspection highlighted the clear and
comprehensive advice and guidance provided by Perth and
Kinross, with strong expectations set around standards and
planning. Key strengths identified include a positive climate and
ethos in schools, effective use of data for improvement, targeted
use of Pupil Equity Funding, and impactful local authority-led
programmes. 
Reduce the poverty-related attainment gap: In 2024/25, there
was steady improvement in literacy attainment across P1, P4, and
P7, with the gap between the most and least deprived cohorts
narrowing from 27% in 2020/21 to 21% in 2023/24. Numeracy
attainment improved in both cohorts, but at a slower rate for SIMD
Q1 than for Q5, resulting in a slight widening of the poverty-related
attainment gap in 2023/24. However, the long-term trend shows
progress, with the gap narrowing from 24% in 2020/21 to 22% in
2023/24. School leaver data shows significant progress, with the
gap between SIMD Q1 and SIMD Q5 in achieving at least one
Level 6 qualification reducing from 40% in 2021/22 to 28% in
2023/24, and the gap for leaving with at least one Level 5
qualification narrowing from 28% to 19% over the same period.
Ensure that Looked After children and children and young
people with additional support needs achieve health, wellbeing
and education outcomes comparable with their peers: The
Council’s new Corporate Parenting Plan 2025-30 sets out clear
priorities to support Looked After Children to achieve their full
potential. The Care Experience Children and Young People Fund
enabled the recruitment of two additional youth workers, ensuring
every secondary school has a dedicated contact/support youth
worker for care-experienced pupils. 
The Staged Intervention Framework was implemented across Early
Learning and Childcare settings and schools, offering a clear
structure to support learners who face barriers. 
Schools are using a range of initiatives to support care-experienced
learners, including one-to-one tutoring, mentoring, Learning Hubs,
and Champions Boards. Outcomes for care-experienced learners
are improving, with higher attainment in literacy and numeracy, and
more care-experienced young people entering positive destinations
on leaving school.  
Ensure that Looked After Children and children
and young people with additional support…
Reduce the poverty-related attainment gap
Ensure inclusive and quality education for all
and promote lifelong learning
1
1
1
1
1
2 2
KPI TREND OVERVIEW
Favourable Change Unfavourable Change Static N/A
Page 88 of 396

Page 89

Executive Summary: Annual Performance Report 2024/25
11 
Protecting and caring for our most vulnerable
people 
Ensure we quickly identify children, young people and adults
at risk of harm and abuse and take the necessary actions to
keep them safe: In 2024/25, Perth and Kinross strengthened its
multi-agency, trauma-informed approach to safeguarding vulnerable
individuals. The Child Protection Duty Team received 8,832
referrals, a 9% increase from the previous year, with all triaged
within 24 hours. The Scottish Child Interview Model was used in
85% of interviews, ensuring children have the best possible
opportunity to tell their story. The Multi-Agency Screening Hub
continued to provide early help to families in need and a Child
Protection Committee Improvement Plan was launched. Adult
protection saw improved triage pathways for those affected by
addiction or mental health issues, and the Adult Support and
Protection assessment framework was revised to focus on the
quality of outcomes for adults and unpaid carers. Joint work in
Letham explored community perspectives on public protection, and
CPC Community of Practice professional development events
helped refresh CPC guidance and support continuous service
improvement.
Ensure that people get the right care, accommodation and
support where and when they need it: Efforts in 2024/25 focused
on delivering timely, personalised care and housing support. Sixty-
four percent of people with intensive needs received care at home,
aligning with national averages. Hospital discharge performance
remained strong, with 97.6% of adults discharged without delay. A
new alliance contract expanded care hours, and internal teams like
HART and HART+ supported more individuals with increased
capacity. Despite challenges in foster and host family recruitment,
we reduced the number of children placed with independent
fostering agencies. A Youth Housing Panel was established to
support care-experienced young people who are moving into
independent living, and homelessness support continued for
refugees and asylum seekers. In response to the national housing
emergency, re-let times dropped significantly, and void properties
were reduced. A Housing Condition Team was established to tackle
condensation, mould, and damp, supported by sensors in over 440
homes to monitor air quality and improve tenant engagement.
Prepare for the establishment of the National Care Service and
continue to strive for excellent health and social care
outcomes for the people of Perth and Kinross: The Scottish
Government has revised its approach and through the Care Reform
(Scotland Bill) will retain key policy commitments such as Anne’s
Law, the establishment of a National Social Work Agency and
improved support for unpaid carers, while no longer pursuing the
transfer of adult social care responsibilities from local authorities. 
Ensure that people get the right care and support
where and when they need it.
Ensure we quickly identify children, young
people and adults at risk of harm and abuse and
take the necessary actions to keep them safe.…
Ensure we quickly identify children, young
people and adults at risk of harm and abuse and
take the necessary actions to keep them safe.…
1
1
2
1
1
2
KPI TREND OVERVIEW
Favourable Change Unfavourable Change Static N/A
Page 89 of 396

Page 90

Executive Summary: Annual Performance Report 2024/25
12
Work with partners to reduce re-offending and support
effective interventions for people in the justice system: Perth
and Kinross Council advanced its justice interventions through
trauma-informed practice and coordinated support. The Connectere
group programme was successfully trialled and expanded, with
trained staff delivering sessions to multiple cohorts. A test of
change supporting individuals released from prison was scaled to
all Scottish prisons, with 68% of participants accepting support. A
Young Person’s Steering Group at Perth Academy evolved into a
peer support model, helping children affected by justice system
contact. Community Justice Services participated in a Care
Inspectorate self-evaluation, highlighting strengths in strategic
alignment and areas for development in performance and quality
assurance frameworks. Harm reduction and recovery activities at
HMP Perth were supported by a peer worker, employed by Hillcrest
Futures, with a large number of group and one-to-one activities
delivered in partnership with the Scottish Prison Service.  
Page 90 of 396

Page 91

Executive Summary: Annual Performance Report 2024/25
13 
Supporting and promoting physical and mental
wellbeing
Work with partners to provide localised health and social care
provision in areas of greatest need and in those most
geographically distant from services: In 2024/25, The Learning
Disability and Autism Strategy continued to guide person-centred
support, while the Scope Team expanded its reach to 367
individuals, helping prevent hospital admissions and supporting
transitions from long-stay care. Carers of people with complex
needs benefited from a new peer support group, and programmes
like CheckIn Giraffe and PAMIS offered meaningful activities to
improve wellbeing and inclusion. Local efforts to reduce isolation
included weekly lunch and soup clubs in Stanley, which saw high
level of attendances. 
Improve health and wellbeing in Perth and Kinross by
increasing overall participation in sport and physical activity
and promoting the wellbeing benefits of time spent in our
natural surroundings: The Council promoted active lifestyles and
wellbeing through inclusive physical activity programmes and
investment in green spaces. Falls prevention classes delivered by
Live Active Leisure staff supported older adults, with over 2,000
wellbeing community classes and more than 20,000 attendances
recorded. Seven parks and play areas were enhanced through
community consultation, and design development for further parks
is underway. The Right Track programme for young people on
deferred sentences was independently reviewed, showing strong
outcomes and earning national recognition, with participants
reporting increased confidence and skill development.
Improve health and wellbeing in Perth and Kinross by ensuring
that people have access to wellbeing support when they need
it: Integrated care services in Perth and Kinross helped 113 people
avoid crisis placements and hospital admissions, with a fully
established hub in Perth city enabling rapid responses to
deteriorating health. Dementia support expanded through Alzheimer
Scotland’s services, with a notable increase in referrals and support
provided. The Community Alarm service handled over 260,000 calls
and now supports over 3,900 clients. Unpaid adult carers received
tailored support through statutory services and community
initiatives, including respite breaks and wellbeing grants. Financial
exclusion among carers was addressed through targeted support
from Citizens’ Advice, with a 40% rise in demand. Mental health
and learning disability services adopted SafeCare for real-time
staffing visibility and enhanced staff training in adult protection,
supported by multi-agency collaboration with Police Scotland and
the Scottish Fire and Rescue Service.  
Improve health and wellbeing in Perth and
Kinross by ensuring that people have access to
wellbeing support when they need it
Improve health and wellbeing in Perth and
Kinross by increasing overall participation in
sport and physical activity and promoting the
wellbeing benefits of time spent in our natural
surroundings
2
1
1 1
1
KPI TREND OVERVIEW
Favourable Change Unfavourable Change Static N/A
Page 91 of 396

Page 92

Executive Summary: Annual Performance Report 2024/25
14
Working in partnership with communities 
Establish locality multidisciplinary teams working with our
community planning partners and residents to identify and
address local solutions to local needs: Perth and Kinross
Council expanded its multidisciplinary approach to addressing
poverty and inequality through the Fairer Futures Fund. New teams
were established in Rattray, South Crieff, and Muirton, building on
existing pilots in Letham, Highland, and Coupar Angus. Local action
plans were advanced through community consultation and service
integration, while coordination was strengthened by consolidating
support and enforcement services. A record number of Community
Resilience Groups were supported to help communities’ response
in the event of an emergency. 
Increase the supply and availability of rural housing: The
Council acquired 20 properties in Dunkeld from the National Trust
for Scotland, enabling secure Council tenancies for local
households. A local lettings policy was introduced to ensure future
allocations favour individuals with strong ties to the area, reinforcing
the principle of “local homes for local people.” Efforts to expand
rural housing focused on securing long-term tenancies and
prioritising local connections. 
Develop and expand our approach to working with
communities to identify local actions and priorities and deliver
on these together: New chalets at Double Dykes provided
culturally appropriate accommodation for Gypsy/Traveller
communities, supported by resident-led engagement. The Warm
Welcome Initiative funded over 100 groups to create winter spaces,
increasing attendance and volunteer participation. We allocated
£100,000 to 28 groups through our Locality Participatory Budgeting
Fund. Volunteer groups contributed 40,000 hours to greenspace
management, and community consultation shaped the design of 11
play areas. Joint investment in Davie Park changing facilities
demonstrated the impact of community-led infrastructure. Equality
aims and outcomes were updated to promote fairness and
inclusion.
Deliver our internal cultural change programme ensuring all
staff contribute to our commitment to engage with and be
accessible and responsive to our residents and communities:
The Council launched a Leadership Competency Framework and
revised its leadership model to support cultural change and improve
community engagement. The Five Foundations of Leadership will
guide future development, while a new Performance and
Development Discussion Framework became mandatory in early
2025 to encourage meaningful conversations about outcomes. All
discussions are recorded to support organisational planning. A
Leadership and Manager Induction Toolkit was developed to help
new managers understand their roles and responsibilities, with full
rollout planned for 2025/26. 
Develop and expand our approach to working
with communities
Increase the supply and availability of rural
housing
4
1
1
1
KPI TREND OVERVIEW
Favourable Change Unfavourable Change Static N/A
Page 92 of 396

Page 93

1 
Appendix 3
Key Improvement activities from CDIP 2024-25 
The following section provides an update on improvement actions included in the Corporate Delivery Improvement Plan 2024/25,
approved at Council on 15 May 2024. 
Priority: Tackling Poverty
What improvements
do we want to
achieve? 
How will we make
these
improvements? 
How will we know
if we have been
successful
(Baseline included
for reference)  
Strategic
Lead 
Target
Date 
Progress Update 
A co-ordinated and
collaborative approach
with partners and
communities to
mitigate the impact of
poverty across Perth
and Kinross 
An overarching
Poverty Strategy,
including key strategic
actions for 2024/25 to
prevent and mitigate
the impacts of poverty
for children living
locally, will be
considered later in
2024 
Performance
measures will be
agreed as part of
the Poverty
Strategy (including
baselines)
Strategic
Planning,
People and
Performance
March
2025
An Anti-Poverty strategy, which includes actions and
performance measures has been developed by the
Anti-Poverty Task Force and actions taken forward by
thematic sub-groups for delivery.
Encourage and
maximise the update
of all supports targeted
for children and young
people to reduce costs
and to reduce the
impact such costs
have on the outgoings
families in poverty 
Increasing uptake of
free school meals for
eligible children 
A 5% increase of
uptake of free
school meals 
Baseline: 2022/23:
65% (primary
pupils); 43%
(secondary pupils) 
Education
and
Learning 
March
2025
2023/24: 65% Primary, 53% Secondary
2024/25:  66% Primary, 60% Secondary 
While the uptake of Free School Meals (FSM) has
clearly increased among secondary pupils, Primary
uptake has not changed significantly and overall, there
has only been a slight increase of around 1% in uptake. 
The uptake of FSM has been actively promoted by
schools and by the central communications team to
encourage applications and uptake. Support is also
provided for families to complete applications.
Encourage and
maximise the update
of all supports targeted
Reduce the cost of the
school day
Schools using the
Cost of the School
Day toolkit with
Education
and
Learning
March
2025
The majority of schools have now included Cost of the
School Day within their school improvement plans and 
5
Page 93 of 396

Page 94

2 
Priority: Tackling Poverty
What improvements
do we want to
achieve? 
How will we make
these
improvements? 
How will we know
if we have been
successful
(Baseline included
for reference)  
Strategic
Lead 
Target
Date 
Progress Update 
for children and young
people to reduce costs
to reduce the impact
such costs have on the
outgoing’s families in
poverty 
action plans in
place 
Cost of the School Day guidance has been published.
Impact will be measured over the course of 2025/26
based on measures included in the plans submitted.
Increasing uptake of
the National
Entitlement Card for
free bus travel to
reduce travel costs
Run drop-in sign up
sessions to support
people who have
challenges to sign up
online. 
A 5% increase in
uptake of the
National
Entitlement Card
amongst under-
22s. 
Baseline: March
2024 18,742 of
under 22s with a
card, 69.4% of
under 22s in P&K
Strategic
Planning,
People and
Performance
March
2025
March 2025 – 20,323 young people between 5 – 21
years with a card – 77.5% of U22s in PKC – this is an
increase of 8.1% compared to the previous year and
above the 5% increase target.  Of the young people 5 –
11 years, 45% with a card, of the young people 12 – 21
years, 99.6% with a card.   
Comms have been issued throughout    the year, on the
Council’s social media platforms and on the real time
information screens promoting the free 60+, disabled
and U22s free bus passes.  The free first Saturday in
the month bus travel was also promoted in these areas.
Promote NEC take up
alongside free
Saturday bus travel
marketing activity 
Priority: Tackling climate change and supporting greener sustainable places
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target  
Date
Progress Update 
Ensure we
have a cleaner
and greener
Council fleet 
Implement the Fleet
Decarbonisation
Strategy for Perth and
Kinross Council
From 2025 100% of all
fleet vehicles under 3.5
tonnes which reach the
end of their useful life or
lease period to be
Environment
and
Infrastructure 
March
2025
The Fleet Decarbonisation Strategy was approved by
the Climate Change & Sustainability Committee in April
2025, with the aim of aligning fleet purchases with
future developments in technology, and with the aim of
increasing the number of Low Emissions Vehicles
(LEVs) within the Council fleet between 2025-2030.
Page 94 of 396

Page 95

3 
Priority: Tackling climate change and supporting greener sustainable places
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target  
Date
Progress Update 
replaced with electric
vehicles
Baseline: In 2022/23 17
fleet vehicles were
electric (4% of total fleet) 
We continue to closely scrutinise UK and Scottish
Government targets relating to green transport to
ensure that we continue to adhere to these. We also
participate in Transport Scotland’s Policy Consultative
Group. In 2024/25, 4.5% of the Council’s fleet were
electric or powered by other zero direct carbon fuel
technologies, above the target of 3.85% with three
electric vehicles purchased in the year.
Develop local
public
transport
solutions
which set the
needs of
residents and
the
environment
as top priority 
Consider how
subsidised local bus
services could be
configured to be more
effective, efficient and
economic, addressing
equality issues and
environmental
commitments
Develop a fully costed
business case for new
models of public
transport delivery
Scoping of proposals and
project plan developed
Establish baseline for
number of journeys
delivered through
subsidised local bus
transport, including
existing support provided
through Demand
Responsive Transport
and Community Transport
Housing and
Communities 
March
2026
PKC IT department have built a Power BI dashboard
for reporting and analysing on bus passenger and
revenue information.  PTU have set up data feeds from
the bus companies who use Ticketer electronic ticket
machines and also a data feed from Stagecoach East
Scotland’s electronic ticket machines.  The Demand
Responsive Data can be inputted manually from
monthly returns.
Consultants have been engaged to support the Council
in the delivery of the outline business case and five
workstreams have been established.
Improved
energy
efficiency and
reduction in
carbon
emissions in
the Council
estate
A Local Heat and
Energy Efficiency
Strategy (LHEES) will
be published in May
2024
Progress on LHEES.
Performance measures
on this improvement will
be agreed as part of
LHEES
Economy,
Development
and Planning 
March
2025
The final approved LHEES and Local Area Energy
Plans were published in May 2024.   Following
publication, a KPI framework has been developed and
external delivery groups have been established.  Key
LHEES delivery actions have been progressed
including option development for a new Perth City
Centre Heat Network and Heat Network Designation
Zoning across Perth and Kinross more widely. 
Page 95 of 396

Page 96

4 
Priority: Tackling climate change and supporting greener sustainable places
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target  
Date
Progress Update 
This Council continued to fund SCARF to provide free
home energy advice. This benefitted over 1638
households, helping to increase the warmth of homes
while bringing down fuel bills and lowering emissions.
As a result, £3,360 of fuel debt was written off,
relieving immediate pressure for households in crisis.
558 households were provided with face-to-face
support and personalised advice and interventions that
helped them take control of their energy usage. This
advice delivered an estimated £51,661 in household
savings and 123.56 tonnes of carbon dioxide
emissions savings. Last, 108 onward referrals were
made to additional schemes and support services,
ensuring clients could access everything from energy
advice funding to welfare rights advice.
Increase
provision of
biodiversity
sites 
Increase
provision of
biodiversity
sites 
Developing a long-term
plan for managed
grassland areas
Increase volume of uncut
grassland areas 
Baseline: 2023/24 40.4ha
(53.68 acres)
Environment
and
Infrastructure 
Housing and
Communities
March
2025
The grassland management trials were further
extended in 2024/25 to include all sites in Perth and
the surrounding landward areas towards Dundee. 
This forms part of the ongoing development of a long-
term plan to support a “long grass” approach across
Perth and Kinross. As part of ‘Grow Wild’ Phase 1, the
area managed under this approach has increased from
49.16 hectares to 121.5 hectares in 2024/25.
Initial monitoring shows that unmown areas support
greater biodiversity, with increases in both insect and
flower populations. This contributes to reversing the
decline in pollinators—essential for food production—
and supports efforts to halt biodiversity loss.
Delivery of UK Shared
Prosperity Fund funded
Biodiversity Towns and
Increase in number of
biodiversity interventions 
Environment
and
Infrastructure 
March
2025
114 community engagements carried out for
Biodiversity towns and villages. 
Page 96 of 396

Page 97

5 
Priority: Tackling climate change and supporting greener sustainable places
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target  
Date
Progress Update 
Villages Project and the
Greening Industrial
Estates Project
Baseline: 2022/23 – 64
biodiversity interventions
completed
Housing and
Communities 
Biodiversity towns and villages help to create habitat
and the monitoring contributes to national recording
statistics to show the changes nationally.
Raingardens help to mitigate flooding. 
Activities delivered include: 
• 10 community mapping sessions
• 11 events (Gardening for Wildlife, Amphibian
Ladders, Scottish Swift Conference, Portmoak
Gala, Hedgehog Highways)
• 27 site visits & recces
• 2 volunteer sessions
• 5 tutorials 
• 18 Snowdrop plantings
• 27 swift box installs
• 7 meetings in person or online 
• 7 interactive Zoom conferences
• 226 fruit tree plantings 
• 18 Mag/BeePost installs 
• 5 Businesses received non-financial support
• 2 SuDS raingardens implemented 
Page 97 of 396

Page 98

6 
Priority: Developing a resilient, stronger and greener local economy 
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target
Date 
Progress Update 
Unlock new
investment in
employment
and housing
land to
support
business
growth in new
growth sectors
Commence design
work and
development of Perth
West Eco Innovation
Park
Level of business interest
in Perth West
demonstrated by leasing
or buying land Baseline:
new measure, baseline
data to be established
2024/25
Economy
Development
and Planning 
March
2025
Design work has already commenced with respect to
opening the 11ha of land that will form the first phase
of the Perth Eco-Innovation Park at Perth West. 
Ground investigations have been carried out and
Heads of Terms will soon be agreed allowing the
transfer of land to the Council.  A commercial real
estate and property investment consultancy (JLL)
began work in May to review market conditions and
recommend a development partner who can work
with the Council to realise the employment potential
of the site. 
There is a steady level of interest from businesses in
industrial sites and premises that the Council owns or
manages including Northfield Business Park. 
Enquiries from companies looking for new premises
in existing commercial business complexes remains
steady.  A baseline measure for this KPI is in the
process of being established. 
Make Perth
and Kinross a
more
competitive
inward
investment
destination
and
encourage
investment for
growth from
Developing and
improving Invest in
Perth information and
support for new and
existing businesses
investing in Perth and
Kinross 
Introduce Business
Enquiry Management
Increased levels of
interest and awareness in
inward investment
opportunities in Perth and
Kinross 
Baseline: new measure,
baseline data to be
establish in 2024/25
through the new Business
Enquiry Management
Economy
Development
and Planning 
March
2025
In October 2024, we launched a refreshed Invest in
Perth website designed to promote Perth and
Kinross as a prime location for doing business. The
new site targets both local businesses seeking
support and those interested in inward investment
and land opportunities. With a cleaner, more user-
friendly design, the website serves as a hub for
signposting to business support agencies while
showcasing current investment prospects.   
Page 98 of 396

Page 99

7 
Priority: Developing a resilient, stronger and greener local economy 
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target
Date 
Progress Update 
existing
businesses in
key growth
sectors 
System to provide
more data and insight 
System being introduced
in 2024
In January 2025, we launched and implemented our
new Customer Relationship Management (CRM)
system. This allows us to track all business
interactions and engagements and monitor business
opportunities and challenges.  
Make Perth
and Kinross a
more
competitive
inward
investment
destination
and
encourage
investment for
growth from
existing
businesses in
key growth
sectors 
Working more closely
with Business
Gateway, Growbiz
and key businesses
and sector
representatives
Increased levels of
interest and awareness in
inward investment
opportunities in Perth 
Baseline: new measure,
baseline data to be
established in 2024/25
through the new Business
Enquiry Management
System being introduced
in 2024
Economy
Development
and Planning 
March
2025
252 Business start-ups were supported by Business
Gateway; this is an increase compared to 23/24
figures. Our New Start and Pre-Start Plus (previously
Early-Stage Growth) target (20) exceeded, with over
22 businesses supported. Perth and Kinross had the
highest BG Growth referrals across Tayside with 23,
which are businesses with projected turnover
increases of £200k+.  Funding is provided to
GrowBiz to support start-up micro enterprises/self-
employed individuals and social enterprises in rural
Perth and Kinross. Support is also provided for
developing an enterprising culture in young people
and in rural communities.    
The 2024/25 target for Enterprise Support for
GrowBiz was 45 businesses a month, totalling 180
over a 12-month period.  This target was exceeded
with a total of 254 businesses receiving enterprise
support in 2024/25.  231 businesses attended
learning & networking sessions, exceeding the target
of 180.  43% of businesses supported in 2024/25 fell
into the category of Perth and Kinross Council's
targeted growth sectors.  The number of new
businesses that started trading with the assistance of
GrowBiz was 76.  Perthshire Artisans had a target to
support 36 creative sector businesses and was
Page 99 of 396

Page 100

8 
Priority: Developing a resilient, stronger and greener local economy 
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target
Date 
Progress Update 
supporting 168 by the end of the 2024/25 financial
year.
Increased
number of
businesses in
the creative
and digital
industries 
Renewed focus on the
visitor, cultural and
creative economy as a
result of greater
collaboration through
the new focussed
delivery structure. 
Demand for business space
for creative and digital
industries will increase 
Baseline: new measure,
baseline data to be establish 
In 2024/25 through the new
Cultural Database in
progress for 2024
Economy
Development
and Planning 
March
2025
Perth and Kinross now hosts 355 registered creative
businesses, with initiatives underway to grow this
number. The Culture Strategy 2023–2025 is being
actively progressed, embedding culture as a driver
of economic growth.
Perth’s UNESCO City of Crafts and Folk Art status
is enhancing its profile, supported by a programme
of impactful local and international projects. The
Famous Grouse Ideas Centre continues to support
innovation, entrepreneurship, and digital growth,
with programmes like The Angel’s Share attracting
investment and supporting business
development. Techscaler has established a regular
presence, helping build a strong tech community
and promoting Perth and Kinross as a hub for digital
business. 
Unlock private
investment and
expertise to
support public
and private
energy projects    
Develop a Strategic
Energy Partnership with
private partner and
pipeline of energy
investable projects
Increased investment in
energy projects shown
through number of strategic
cases approved for delivery
which include financial
investment 
Baseline: new measure,
baseline data to be establish
in 2024/25 
Economy
Development
and Planning 
March
2025
We are progressing the Strategic Energy
Partnership approach and have received advice
from our legal advisers on the appropriate delivery
models – based on other experience from similar
models from across the UK.  A draft Procurement
Strategy will be agreed by an officer Board
currently being established.  A Competitive
Dialogue process will be used to select a private
sector partner which should be announced by
March 2026.
Page 100 of 396

Page 101

9 
Priority: Developing a resilient, stronger and greener local economy 
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target
Date 
Progress Update 
Increase in number of
registered businesses in
energy
Baseline: established in
2022/23 Annual
Performance Report
More people
choose Perth
and Kinross as
a destination
for holidays
and day trips
Increased promotion of
consumer and visitor
offer via Perth City and
Towns website and
social media channels 
Deliver national and
international tourism
campaigns with Visit
Scotland. Attend or be
represented at national
and regional travel trade
events
Increased consumer and
visitor expenditure, dwell
time and overnight stays.
Baseline: 2022 
Direct tourism expenditure:
£463.48 million
Average length of stay
(staying visitors): 3.1 days 
Economic impact of tourism:
£646.50 million
Economy
Development
and Planning 
March
2025
Perth City & Towns is the promotional arm of Perth &
Kinross Council in terms of residents and visitors,
overseeing the marketing and promotion of Perth City
and the surrounding towns, large events, and footfall
drivers, as well as tourism initiatives for the area, The
website offers promotional opportunities for retail,
hospitality businesses, visitor attractions and event
organisers via a multi-platform marketing strategy and
vibrant, varied programme of events. Perth City and
Towns Website – 
108,685 Active Users - 57,670 of which is organic
search. 
Top Location – London with 23,169
Followed by Perth – 17,604  
Edinburgh, Dundee and Glasgow. 
Locations spanning across the UK.   
Social Channels: 
Facebook 33K followers 
Twitter / X 11K followers  
Instagram 7K followers.   
Mailchimp Newsletter – 23K – Monthly Newsletter
advertising what’s on across the region.   
Page 101 of 396

Page 102

10 
Priority: Developing a resilient, stronger and greener local economy 
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target
Date 
Progress Update 
We delivered a series of creative campaigns and events
to promote Perth city centre and support local
businesses. Notable new additions included Perth
Cocktail Week, which showcased 35 venues and
generated an economic impact of £263K, and the Street
Life Campaign, which highlighted over 130 independent
retailers, reinforcing Perth’s identity as a hub for unique,
local shopping. 
Other initiatives included Perth Eat Week, the launch of
a new City Centre Map, and continued promotion of the
Perth & Kinross Gift Card, all aimed at boosting visibility
and footfall across the city.  
Events are the most popular pages with the Christmas
Blog generating 21,158 page views, followed by the
events and festivals blog generating 19,341 page views. 
Perth City and Towns platform will continue to be used
to promote the region. The website will undergo a
rebuild in 2025/2026 to further enhance the brand,
improve navigation, refresh content whilst also adding
additional functions to support promoters and end users.  
Further
enhance our
employability
outreach
capacity,
supporting
individuals in
community
settings   
Review and increase
the number of
employability outreach
locations and frequency
Increased numbers of
individuals supported in
targeted locations and
overall increase in number
of people supported 
Baseline: 2022/23 - 215
number of people supported
in outreach locations
Economy
Development
and Planning 
March
2025
We have increased the number of people supported
overall, including within key priority areas. Within
2024/2025 we have supported 199 parents with 45 of
those participants moving into Self-employment 13 of
which were supported with childcare whilst moving
back into employment. 119 participants have been
successful at accessing our training grant which is in
place to upskill or gain a new qualification.  While
direct outreach remains a challenge, we have
strengthened local visibility and access by working
Page 102 of 396

Page 103

11 
Priority: Developing a resilient, stronger and greener local economy 
What
improvements
do we want to
achieve? 
How will we make
these improvements? 
How will we know if we
have been successful
(Baseline included for
reference) 
Strategic
Lead 
Target
Date 
Progress Update 
through trusted partners, improving referral routes,
and responding quickly to identified needs. Working
in partnership with different services at the NEXT
STEPS 4 ALL employment drop-ins at Letham 4 all
we have seen 21 clients engage with us since this
began in March 25’   We are a referral pathway on
FORT giving better access to employability services –
1 referral from a different agent so far but support is
now in place.   
Crieff community campus remains an outreach hub
on the first Thursday of every month – the staff were
keen to give us a bigger presence in the library
allowing us to connect with book bug attendees.   
Recognising challenges around traditional outreach,
our approach has focused on making ourselves more
visible and accessible where families already are –
flexibility has been key. Strengthening warm referral
pathways through partners such as Business
Gateway and establishing a regular presence at The
Hub – allowing families to meet with us in trusted,
familiar spaces. We are collaborating and working
together to improve visibility – employability board/
flyers on tables and marketing for tv screen in main
foyer.  
Page 103 of 396

Page 104

12 
Priority: Enabling our children and young people to achieve their full potential 
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead
Target
Date
Progress Update
Attainment at key
milestones is raised
for all children and
young people 
Using health and
wellbeing census
data to inform
school level
improvement
plans 
PKC attainment for each
of the indicators within the
Corporate Plan will
increase to at least target
levels. 
Baseline: established in
2022/23 Annual
Performance Report
Education
and
Learning 
February
2026
For Session 2024/25:31% of primary schools had
included a priority addressing Health and Wellbeing on
their School Improvement Plans:
22% of primary schools identified the Nurturing Schools
programme
13% identified Relationships and Behaviour
10% identified Health and Wellbeing curriculum
development
Over 70% of schools have now engaged with the
Nurturing Schools Programme. 
Increase the number
of young people
going into positive 
destinations such as 
work experience, 
further education, 
volunteering and 
employment 
By placing an 
Employability
Youth 
Worker in each 
locality to liaise
with 
school 
Early intervention
approach in
school and
delivery of
employability
programmes 
Increase in school leavers
entering positive initial
destinations 
Baseline: 2022/23
(95.97%) 
Education
and
Learning 
March
2025 
Summer leaver data is not yet available for 2024/25,
however for 2023/24 the percentage of school levers
entering an initial positive destination increased to 96.4%
from 95.97% in 2022/23. 
Over the course of the year, an internal Work Placement
Assessors course has been delivered in conjunction with
the corporate Health and Safety team.  20 staff have now
been trained, including Employability Youth Workers. 
This has built additional capacity for work placements to
be arranged and by training the Employability Youth
Workers, those who are most at risk of not achieving a
positive destination can be prioritised for work experience
placements. 
The number of pupils undertaking work experience
placements has increased to 596 in 2024/25 and is on a
steady upward trajectory from 264 in 2021/22.
External funding has been secured to run a pilot
Enterprise and Employability programme at Perth High
Page 104 of 396

Page 105

13 
Priority: Enabling our children and young people to achieve their full potential 
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead
Target
Date
Progress Update
School for S3 pupils who are at risk of not achieving a
positive destination. YMCA are working with groups of 6-
8 young people in each school with a focus on
employability skills. 
The impact of the programme includes an Employability
Award at SCQF Level 4 which all participants are on
track to achieve. This recognises improved consistency in
attendance and engagement, improved attitude towards
youth workers, improved engagement in accredited work
and participation in wider opportunities.  Those delivering
the programme reported improved engagement,
development of key life skills, and increased self-
confidence among participants, many of whom may
underachieve within the school environment and leave
school with no positive destination.
A school
atmosphere
conducive to
learning and
personal
development, where
children and young
people feel safe,
secure, listed to and
have their views
taken into account
on issues that affect
them
Implementation of
the updated Anti-
Bullying Strategy
which will include
key strategic
actions for
2024/25 
Schools will have robust
procedures to reduce
bullying in line with
improving relationships 
Education
and
Learning 
March
2025 
The PKC Anti-Bullying Strategy and supporting
Operational Guidance were published in June 2024.
These support children, young people, parents and staff
in schools and ELC settings to feel be informed on
approaches to prevent bullying and be confident that
bullying can be addressed wherever it happens. 
Schools are using these to inform the development of
local procedures, appropriate to their own context.
Considerable work has been undertaken on
Relationships and Behaviour with the promotion of a
culture and ethos within our settings where positive,
respectful relationships and valued and invested in. 
Guidance on relational approaches has been shared with
schools. Support and professional learning has also been
provided to ensure that respectful relationships and
Page 105 of 396

Page 106

14 
Priority: Enabling our children and young people to achieve their full potential 
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead
Target
Date
Progress Update
positive behaviour are a foundation of practice within
schools and ELC settings. The most recent available data
for 2024/25 shows a reduction of 7% in the number of
bullying incidents recorded when compared with the
previous year.
Improved
understanding of
causes of
attainment gap so
that effective
interventions can be
identified and
implemented
Review and
refresh the Perth
and Kinross
Council
interventions
toolkit to address
the needs of key
priority groups 
All schools will plan,
record and track pupil
progress via the Closing
the Gap tool 
A reduction in the poverty-
related attainment gap for
school leavers 
Baseline: established in
2022/23 Annual
Performance Report
Education
and
Learning 
March
2025
The Interventions Toolkit was launched in 2023 and was
subsequently updated in 2024 to share details of impact
of interventions in Perth and Kinross settings.  The tool
provides links to resources, training and guidance with a
focus on evidence-based interventions and approaches,
including support for practitioners in undertaking needs
analysis. 
It links very closely with the Closing the Gap Tool (CTGT)
which tracks and monitors PEF-funded interventions
aimed at improving outcomes for children and young
people impacted by poverty, with a focus on tackling the
poverty-related attainment gap. 
KPI - 100% of schools are using the CTGT to plan, track
and monitor interventions, with impact measured and
next steps noted.  This facilitates quality assurance of all
interventions funded by Pupil Equity Funding (ensuring
that the conditions of the grant are adhered to and that
interventions are appropriately targeted and evidence-
based). It also enables the dissemination of good practice
and successful outcomes across the service through
case study and report evidence. 
KPI - Leaver data in relation to the Poverty Related
Attainment Gap demonstrates a reduction over time. The
Page 106 of 396

Page 107

15 
Priority: Enabling our children and young people to achieve their full potential 
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead
Target
Date
Progress Update
gap between SIMD Q1 and SIMD Q5 school leavers
attaining 1 or more qualification at SCQF Level 5 has
reduced from 28% in 2020/21 to 19% in 2023/24. The
gap between SIMD Q1 and SIMD Q5 school leavers
attaining 1 or more qualification at SCQF Level 6 has
reduced from 41% in 2020/21 to 28% in 2023/24
Improve support to
children and young
people with
additional support
needs to realise
their full potential 
Through the
Additional
Support for
Learning
Transformation
Programme 
Maintain or reduce
placement within
independent schools
Baseline: new measure,
baseline to be established
in 2024/25
Education
and
Learning 
March
2025
We currently have 29 children placed in independent
schools. This is a concerning spike in what was
previously a downwards trajectory.  The implementation
of actions from the ASN Transformation Programme will
address this going forward with the creation of three
additional Intensive Support Provisions across Perth and
Kinross (open in August 2025).  Additionally, a review of
the provision for children and young people with Social
and Emotional Behaviour Needs (SEBN) will ensure that
their needs can be appropriately met. 
A revised model for support staff and the use of PowerBI
will provide time for schools to ensure that ASN data is
accurately recorded and that the allocation of support is
closely linked to identified need. 
Career Progression Pathway models for staff supporting
learners with ASN have been drafted with mapping
underway to ensure that all training is linked to statutory
duties, is evidence-based and links to the Staged Levels
of Interventions. 
The Compass App, designed by ARC Scotland, is being
rolled out across PKC secondary schools. This enhances
understanding of the post-school transition process by
Page 107 of 396

Page 108

16 
Priority: Enabling our children and young people to achieve their full potential 
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead
Target
Date
Progress Update
young people with additional support needs and the
adults supporting them, enabling them to be more in
control of the process. 
Education and Learning and NHS Tayside have
collaborated to complete an audit of young people in S3 –
S6 who meet the criteria for an intellectual disability,
facilitating services providing post-school support to more
effectively plan their provision to improve options for the
young people. 
Various initiatives have been implemented to support
inclusive learning environments across PKC, including
the purchase of enhanced support resources, such as
pop-up sensory spaces (tents) and weighted blankets,
vests, or body socks for children who require appropriate
pressure support to help them regulate their behaviour. 
Compared with the previous year 2023/24, data on the
number of incidents of incidents of distressed,
challenging, violent or aggressive behaviour reported by
staff in 2024/25 has shown a reduction of 12%, which is
almost 200 fewer incidents.
Provide Kinship
Carers with a range
of supports to
enable them to meet
the needs of
children in their care 
Provide
opportunities for
Kinship Carers to
engage in: 
• Support groups 
• Training 
Number of Support
Groups and Training
Opportunities afforded to
Kinship Carers 
Baseline: new measure
baseline to be established
in 2024/25
Children,
Families
and Justice 
March
2025
Our Carers Group for kinship meet monthly. We have a
core group of around 12 carers who attend regularly. The
group is gaining popularity, and our carers are actively
encouraged to join us. In the support group we present
opportunities for learning. The model works very well as it
generates a lot of discussion. During the assessment
process, learning for carers takes place – for example, a
common theme is trauma related care, and carers are
asked to reflect on this to increase their understanding.
Page 108 of 396

Page 109

17 
Priority: Enabling our children and young people to achieve their full potential 
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead
Target
Date
Progress Update 
Following the placement of a child a common theme we
address is around Life Story and how carers can help a
child understand their circumstances. 
There are also ongoing supports in local communities
being developed to support the development of informal
networks. The support has ensured that carers feel able
to care for the children and avoid a breakdown in the
arrangement. 
We recognise that not all carers want to attend a group
and have a model of support where individual carers are
allocated an individual worker this allows for one-to-one
support if that is there preferred option. National
resources are available, and carers are aware of how to
access them.
Improve educational
outcomes for looked
after children 
Where additional
educational
support is
identified in a
child’s plan – to
provide access to
online tutoring. 
Number of looked after
children in receipt of online
tutoring. 
Baseline: new measure,
baseline to be established
in 2024/25 
Children,
Families
and Justice 
March
2025
29 pupils have been supported via online and face 2 face
tutoring support from the Volunteer Tutors Organisation
(VTO).
Page 109 of 396

Page 110

18 
Priority: Protecting and caring for our most vulnerable people 
What
improvements
do we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead 
Target
Date 
Progress Update 
Take a
partnership
approach to the
assessment of
risk of significant
harm to a child 
Undertake Initial
Referral
Discussions
between Social
Work, Police,
Health and
Education
Number of Initial Referral
Discussions 
Baseline: new measure,
baseline to be established
in 2024/25
Children,
Families
and
Justice 
March
2025
In 2024/2025 there was a total of 222 Initial referral
discussion (IRDs) across Children and Family social
work service. These IRDs involved 358 children and
young people. These discussions always include
relevant partners in the police, social work, health
and, where necessary, education. In keeping with
the previous years, the need for IRDs continues to
reduce and we think this relates to improved
universal support services and increased early
intervention preventing crisis and the need for crisis
intervention. 
Take a
partnership
approach to
minimising and
reducing risk
through early
support and
assessment
Weekly Multi
Agency Screening
Group (MASH) to
triage referrals
Number of Families triaged 
Number of children triaged
Baseline: new measure,
baseline to be established in
2024/25 
Children,
Families and
Justice 
March
2025
Between April 2024 to March 25, 218 children were
triaged and allocated via the weekly MASH meetings.
This equates to 185 families which has increased from
the 170 in the last reporting year. 
We are keeping intervention at a proportionate level
according to assessed need. In line with the Promise,
we are ensuring that families are receiving the right
support at the right time. It’s not appropriate for us to
measure impact/ outcome when all we have done is
triaged the referral to the most appropriate place.
Enhance our
housing support
offer by
implementing an
Intensive
Housing Support
Service for
people with
complex needs
Commission a third
sector provider to
deliver intensive
housing support.
Repeat homelessness
presentations will be
minimised and tenancy
sustainment for previously
homeless people with
complex needs will increase 
Baseline: 
Housing and
Communities 
March
2025
The Intensive Housing Support service was
commissioned and launched in October 2023. Since its
introduction, the service has consistently operated at
full capacity, supporting approximately 20 individuals at
any given time. 
It is delivering significant benefits for people whose
needs exceed the scope of existing support services.
However, due to the relatively small scale of the service
Page 110 of 396

Page 111

19 
Priority: Protecting and caring for our most vulnerable people 
What
improvements
do we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead 
Target
Date 
Progress Update 
2019/20 (25); 2020/21 (30);
2021/22 (15); 2022/23 (5)
Feedback from people with
complex care needs will be
positive with better outcomes
being reached. Qualitative
measure to demonstrate
positive impact
and the short time it has been in place, it is challenging
to demonstrate outcomes through key performance
indicators (KPIs). Many of the individuals supported
have complex, long-term needs and deeply embedded
behaviours, which require time and sustained support
to address. The Intensive Housing Support service
contract runs to October 2025 and has been extended
to March 2026. Beyond this, we intend to mainstream
the service by including it as part of the
recommissioning of the much larger Floating Housing
Support service, by redesigning the model to provide
for service-users with Low, Medium and High support
needs. The new, integrated service will be in place from
April 2026.
Where children
cannot remain
living at home,
every effort is
made to keep
them within their
kin network
Children, parents /
carers and kin
networks are
listened to and
afforded the
opportunity to have
their say through
Family Group
Decision Making
Number of families
completing the Family Group
Decision Making (FGDM)
process and adhering to a
family plan 
Baseline: new measure,
baseline to be established in
2024/25
Children,
Families and
Justice 
March
2025
The FGDM and Lifelong Links continue to be promoted
and offered to families. We have rolled out the
connections tool which identifies who is important to the
child and who they want to keep in touch with. This is
proving very popular with children and young people
and other local authorities. In the past year 76
children/young people were referred, and plans agreed
for 54 of these. This is shown in the overall decrease of
children and young people being accommodated and
an increase in those in kinship arrangements.
Maintain
significant
relationships for
care experienced
children to deliver
on the principles
of The Promise
Offer care
experienced
children and young
people to create a
Lifelong Links
plans to maintain
Number of children and
young people completing
Lifelong Links plans
Baseline: new measure,
baseline to be established in
2024/25
Children,
Families and
Justice 
March
2025
We have identified a space where brothers and sisters
who are separated can come together and have fun.
During 2025/26 this will become operational and is
being designed with the voice of children and young
people and carers in mind. 
Page 111 of 396

Page 112

20 
Priority: Protecting and caring for our most vulnerable people 
What
improvements
do we want to
achieve?
How will we
make these
improvements?
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead 
Target
Date 
Progress Update 
significant
relationships.
In line with The Promise which recognises the
importance of sibling relationships - we are creating a
place where meaningful sibling family time can take
place. We want this to be an organic development and
will promote it through our networks. 
Page 112 of 396

Page 113

21 
Priority: Supporting and promoting physical and mental wellbeing
What
improvement
s do we want
to achieve? 
How will we
make these
improvements? 
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead 
Targ
et
Date
Progress Update 
Increase uptake
of sport and
physical
activities.
Work with key
partners to develop
programmes which
optimise
opportunities for
physical activity
Numbers of participants have
increased. Baseline: 2022/23
(1.002M)
Economy,
Development
and Planning 
March
2025
Working with key partners throughout 2023-24 and into
early 2024-25, there was continued focus on the
completion of the Year 1 Action Plan, developed as part
of the Physical Activity & Sport Strategy 2023-2028.   
However, due to the unexpected flooding and
subsequent closure of Bells Sports Centre in October
2024, this had a significant impact on the usage levels
and all individual and group bookings, had to be re-
directed to other available venues across Perth & Kinross
for the foreseeable future.   
The Olympia Dundee re-opening early in 2024, also
impacted the displacement that had been evident
throughout 2023-24 at Perth Leisure Pool.   
Overall, participation in 2024-25 dropped to 886,359.
Increase uptake
of sport and
physical
activities.
Social prescribers
encouraging the
use of outdoor
activities
Reduction in health and social
care issues related to
inactivity. Baseline: new
measure, baseline to be
established in 2024/25
Health and
Social Care
Partnership 
March
2025  
This action is to be removed as there is no data and for a
range of reasons this is not measurable.
Increase uptake
of sport and
physical
activities.
Work with schools
and sport groups to
increase the
number of
opportunities for
children and young
people to take part
in physical activity
Number and percentage of the
total school roll (primary and
secondary) participating in
Active Schools/ school sports 
Baseline: established in
2022/23 Annual Performance
Report
Education
and Learning 
March
2025
Through our commitment to Physical Education, Physical
Activity and Sport (PEPAS), and working in partnership
with a range of other organisations (e.g. Live Active
Leisure, UHI Perth, SportScotland and community clubs),
participation in extra-curricular sport activities has
continued to improve with a 43% participation rate in
2024/25. 
Page 113 of 396

Page 114

22 
Priority: Supporting and promoting physical and mental wellbeing
What
improvement
s do we want
to achieve? 
How will we
make these
improvements? 
How will we know if we
have been successful
(Baseline included for
reference)
Strategic
Lead 
Targ
et
Date
Progress Update 
This equates to 7859 primary and secondary pupils
taking part in extracurricular sport and physical activity, a
1% increase on the 2023/24 academic year.  
Notably PKC secondary school pupils’ participation in
extracurricular clubs is in the top 3 local authorities in
Scotland at 38%.
Reduce waiting
times for people
to access
Mental Health
Services. 
Redesigning
specialist
community mental
health services
across Tayside.
Reduction in waiting lists
(weeks) 
Baseline: established in
2022/23 Annual Performance
Report 
Health and
Social Care
Partnership 
March
2025
The CMHWB Delivery Plan has now come its conclusion
and so we are moving to a new version which will be
more strongly aligned to the pan-Tayside vision of have a
more uniform "Model of Care" for Tayside.
Deliver the
Strategic Delivery
Plan for
Community Mental
Health and
Wellbeing
(CMHWB)
Increase access to
preventative and
community
support. 
Reduction in waiting lists
(weeks) 
Baseline: established in
2022/23 Annual Performance
Report 
Health and
Social Care
Partnership 
March
2025 
Page 114 of 396

Page 115

23 
Priority: Working in Partnership with Communities
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we have
been successful (Baseline
included for reference)
Strategic
Lead
Target
Date
Progress Update
Deliver a clear,
consistent, and
joined up approach
to supporting
communities and
households with the
help and support
they need to
mitigate and move
beyond poverty. 
Develop multi-
disciplinary
locality working
focussed on
locally identified
needs. 
Feedback from communities
and staff on the effectiveness of
the multi-disciplinary team
approach 
Strengthened partnerships
within localities with case
studies to evidence 
Qualitative measure to
demonstrate impact
Strategic
Planning,
People and
Performance 
March
2025
March
2026
Progress has been made in several areas and new
areas have been identified to enhance our rolling
programme. External evaluation activity with the
Scottish Government is planned for 2025 to better
assess which approaches and interventions have
the biggest impact.
Provide more
affordable homes to
support liveable and
sustainable
communities
Deliver PKCs
affordable
housing
programme of
1,050 over the
next 5 years 
Maintain 53%/47% split across
urban and rural areas, which is
in line with the population split
in Perth and Kinross 
Baseline: 22/23: Total 242
homes (54 buybacks/ empty
homes; 145 new rural homes
(77%) and 43 new urban homes
(23%)
Achieve an average 210
affordable housing completions
each year. Baseline: 2022/23
(203) 
Economy
Development
and Planning 
March
2027
The adopted Local Housing Strategy 2022-27
(March 2023) target is to deliver 1050 affordable
homes with an Urban (53%) / Rural (47%) split to
ensure representative distribution. In financial year
2024/25, there were 264 (above target of 210) new
affordable homes completed by PKC and our RSL
partnerships with an urban/rural split of 53% Urban
(140) and 47% Rural (124). 
Note that the rural figure reported here is greater
than the ‘total number of houses built in rural areas’
as reported in the APR (113). This is due to the
inclusion of new supply affordable homes that are
provided via empty homes grant initiative. 
Support community
groups to manage
local assets, such as
community halls
Support
community
groups to
develop
Community
Increase in number of
Community Asset Transfers 
Baseline: 2022/23 (0) 
Housing and
Communities 
March
2025
In 2024/25, we supported 34 community groups who
expressed interest in Community Asset Transfer
(CAT), providing them with relevant asset
information and a single point of contact. This is an
increase from 31 groups supported in 2023/24.
Page 115 of 396

Page 116

24 
Priority: Working in Partnership with Communities
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we have
been successful (Baseline
included for reference)
Strategic
Lead
Target
Date
Progress Update
Asset Transfer
(CAT) plans 
Carry out
engagement
activity to
promote
Community
Asset Transfer
as an option
Increase in community groups
applying for community asset
opportunities. 
Baseline: established in
2022/23 Annual Performance
Report 
This approach has helped build relationships and
enabled meaningful discussions about whether CAT
is the right path for each group. Currently, 16 groups
are still considering the CAT process—a reduction
from 21 live cases at the end of 2023/24. This
decrease is due to some groups finding alternative
solutions outside the CAT process, while others
have chosen not to proceed with their projects. Each
group progresses at its own pace, but several are
expected to move forward with full Stage 2
applications within the next year. 
The launch of the Advancing Community Assets
Fund in 2024/25 has further supported progress. To
date, £74,000 has been allocated to fund capital
works, surveys, valuations, and development
workers to strengthen community ownership
applications. 
Examples of groups that found alternative solutions
in 2024/25 include:
• Blairgowrie and Rattray Development Trust, who
secured a long-term lease for Wellmeadow
Toilets in July 2024, ensuring the facility—
previously earmarked for closure—remains open
to the public.
• Aberfeldy Development Trust, who completed the
purchase of the Slaughterhouse Field site to
develop community-owned affordable housing.
Increased
engagement and
applications from
Review
application and
assessment
Increase in the number of
groups receiving community
investment funding 
Housing and
Communities 
March
2025
In 2024/25, Ward Panels allocated just over
£326,000 to support 114 projects aligned with the
priorities set out in the Council’s Corporate Plan.
Page 116 of 396

Page 117

25 
Priority: Working in Partnership with Communities
What
improvements do
we want to
achieve?
How will we
make these
improvements?
How will we know if we have
been successful (Baseline
included for reference)
Strategic
Lead
Target
Date
Progress Update
communities to the
Community
Investment Fund
(CIF) grants
programme
process and
implement
improvements
identified
through
evaluation of the
2023/24
Community
Investment Fund
programme
Baseline: established in
2022/23 Annual Performance
Report
Increase in the number of
people benefitting from a
Community Investment Fund
funded project 
Baseline: 2021/22 36,115
people benefitted from a
Community Investment Fund
funded project 
A review of the application and assessment process
has been completed, and a new proposal will be
brought forward for the 2025/26 Community
Investment Fund grant programme. The proposed
model aims to:
• Increase engagement with communities and
community organisations
• Strengthen collaborative working at a local level
This refreshed approach is designed to ensure the
fund continues to deliver meaningful impact and
supports community-led priorities.
An empowered and
skilled workforce
who are confident in
engaging with
resident and
communities and
demonstrate the
organisational
values and expected
behaviours at all
times. 
Delivery of
action within the
Employee
Engagement
and Cultural
Change
Programme.
Feedback from our workforce,
managers, and community
members
Strategic
Planning,
People and
Performance 
March
2025
The People and Culture Strategy 2024-28 Delivery
Action Plan was approved in June 2024 and
expanded on the work of the previous Employee
Engagement and Cultural Change Programme. It
includes specific measures allowing the monitoring
and measurement in specific areas to identify
improvement and the need for further action.  The
plan is monitored by the Workforce Planning
Themed Board, chaired by Strategic Lead, Strategic
Planning, People and Performance. 
The 2024 Employee Survey results are a positive
indication that we are effectively delivering the
improvements with 92% of respondents saying they
feel their team demonstrates the PKC values often /
every day. The development of individual team
action plans created in response to survey results
and the progress made with these has allowed
continued monitoring of the response and progress
towards improvement. A further survey will take
place in autumn 2025.
Page 117 of 396

Page 118

26 
Page 118 of 396

Page 119

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality   
__________________________________________________________________ 
Committee or Board:  Perth and Kinross Council 
Date of Meeting:  29 October 2025 
Report Title:  Local Child Poverty Action Report and Children’s
Scorecard 2025 
Report Number:  25/276
Report Author:  Margaret Lynch, Poverty Officer
Organisational Lead:  Greg Boland, Strategic Lead -Strategic Planning,
People and Performance 
1. Purpose 
1.1  The purpose of the report is The Child Poverty (Scotland) Act 2017 requires
Perth and Kinross Council and NHS Tayside to publish a Local Child Poverty
Action Report (LCPAR) annually. This is the 7th report, presenting:
• An update on actions taken during 2024/25
• The new Child Poverty Action Plan for 2025/26
• Progress against the Child Poverty Delivery Plan 2022–2026
• The Children’s Scorecard 2025 
1.2  Arrangements have been made to share the report with the Community
Planning Partnership board members, the Anti-Poverty Task Force and the
Integrated Joint Board. 
2. Recommendations 
It is recommended that the Council:
2.1  Note the report.  Confirm continued commitment to the strategic aims of the
Child Poverty Strategy set out in the Local Child Poverty Action Plan 2020/21l:
• Raise awareness of the causes and consequences of child poverty
• Foster social cohesion and reduce stigma
• Reduce the negative effects of poverty on children and families
• Enable children and families to prepare for a life free from poverty 
6
Page 119 of 396

Page 120

2.2 Reaffirm commitment to the objectives of the  Perth and Kinross Child Poverty
Delivery Plan 2022–2026 and work with NHS Tayside and Community
Planning Partners to: 
• Provide opportunities and support to enter, sustain and progress in work
• Maximise support for families to lead dignified lives
• Support the next generation to survive and thrive
• Deliver a one-Council, whole-family, whole-community approach to
poverty mitigation and prevention in Perth and Kinross. 
3. Structure of report
3.1 This report is structured as follows:
• Background / Main Issues
• Proposal
• Conclusion
• Appendices – Child Poverty Delivery Plan and Children’s Scorecard 
4.  Background/Context
4.1  The LCPAR follows Scottish Government guidance, with a strategic focus,
evidence-based reporting, and case studies. It provides a review of what has
been done to tackle child poverty in the last year, and what is planned for the
year ahead. 
4.2  The LCPAR is accompanied by the Children’s Scorecard which measures
progress on child poverty against 31 local indicators and assesses service
responsiveness to those issues raised by parents from the Priority Family
groups in the research which informed the development of the Child Poverty
Delivery Plan 2022-2026. 
4.3 Perth and Kinross Council, in partnership with NHS Tayside and Community
Planning Partners, has adopted a whole-systems, place-based approach to
tackling child poverty. The strategy is informed by lived experience, aligned
with national frameworks like Best Start, Bright Futures, United Nations
Convention on the Rights of the Child (UNCRC), Getting It Right for Every
Child (GIRFEC), and Scotland’s Promise to Care. The Council’s whole
systems approach emphasises:
• Relationship-building
• Local agency
• Multi-level collaboration
This fosters dignity, resilience, and long-term change.
4.4  Governance has been strengthened through the Anti-Poverty Task Force,
Poverty Board and the Poverty Working Group. The Poverty Working Group
provides operational support. The Children’s Scorecard continues to track
progress and service responsiveness.
Page 120 of 396

Page 121

4.5 The latest figures show 5,155 children (19.2%) living in relative poverty in
Perth and Kinross, down from 5,750 (21.7%) the previous year. This marks a
2.5% reduction, widening the gap with the Scottish average to 3.8%. Perth
and Kinross now rank 7th nationally for lowest child poverty rates, up from
12th position which was held in recent years. This indicates that local action
has been effective in reducing child poverty beyond that driven by measures
taken by the Scottish or UK Governments. 
4.6 This year the Children’s Scorecard takes a deeper dive into the statistics
around delivery and performance.  It reports on the analysis of data from 2018
– 2022 and 2022 – 2024 to mirror the periods of the two Child Poverty
Delivery Plans of the Scottish Government, and the Child Poverty Delivery
Plan for Perth and Kinross. It reports on indicators which measure progress in
poverty and inequality, income maximisation, dignified living and survive and
thrive – the 3 workstreams of the Child Poverty Delivery Plans of the Scottish
Government and Perth and Kinross. Positive signs include: -
• The drop in the number of children in poverty because of housing costs
from 2501 in 2022 to 1959 in 2024. (Relative poverty is calculated before
housing costs by the UK Government and after housing costs) by the
Scottish Government, therefore we can calculate how many children
experience poverty because of housing costs). 
• Strong delivery around affordable housing via the Affordable Rents policy
and the increase in the supply of affordable housing. Perth and Kinross
Council is ranked 7th out of all Scottish local authorities for per capita
increase in housing stock between 2018 and 2024. 
• Since 2018, 2042 people have progressed into employment because of
their participation in Council funded or operated employability schemes
and the pay gap between Perth and Kinross and Scotland closed.
Between 2018 and 2022 and by 2024, Perth and Kinross had a positive
pay gap with Scotland of £3.10 above the national average. 
• Since 2022, Perth and Kinross Council’s Welfare Rights Team and Perth
Citizen’s Advice Bureau (CAB) delivered £25.2 million in client financial
gain. When compared with peer local authorities, Perth and Kinross is
amongst the top performers for Scottish Welfare Fund grant accessibility
and support.
• The Not in Employment, Education and Training (NEET) rate for 16 – 19-
year-olds declined from 6% in 2018 to 4% in 2024; Perth and Kinross
has an employment rate of 61% for young people aged 16 – 24 which is
8 points above the Scottish average. 
• In terms of child development – post Covid-19 recovery for 4 – 5-year-
olds has been good for those who were babies at the time of the
pandemic.
• Education and Learning has delivered exceptional performance around
narrowing the poverty-related attainment gap at a time when most
authorities have seen widening gaps at all levels. 
Page 121 of 396

Page 122

4.7  However, challenges remain such as:
• Housing costs push nearly 2,000 children below the poverty line.
• 590 families are affected by the two-child benefit cap.
• The Gender pay gap remains static at 15.6%.
• Transport and childcare barriers to employment persist, especially in
rural areas
• Targeting interventions and monitoring service delivery to ensure
that efforts to support parents to progress into work, attain dignified living
conditions and wellbeing support is reaching Priority Families and those
in most need. 
• Information on correctives actions are included in the LCPAR Plan for
25/26 and the Child Poverty Delivery Plan 2022 – 2026, however the
next iteration of the Child Poverty Delivery Plan 2026 – 2030 will have to
pay keen attention to these challenges. 
5.  Proposals and Next Steps  
5.1  This report details work undertaken in 2024/25 in fulfilment of the 2024/25
Local Child Poverty Action Plan and sets out the Action Plan for 2025/26. 
5.2 The Local Child Poverty Action Plan for 2024/25 comprises workplans for
three key areas: 
Work - Providing opportunities and support needed to enter, sustain, and
progress in work (employability and skills, housing, connectivity, childcare and
economic opportunity) 
Dignified Living - Maximising the support available to families to lead
dignified lives and meet their basic needs (person-centred support, social
security, and income maximisation) 
Survive and Thrive - Supporting the next generation to survive and thrive
(next generation). 
5.3  This work will be subject to independent scrutiny by the Anti-Poverty Task
Force who will provide additional expertise from across Perth and Kinross
which will inform the implementation, monitoring and evaluation of the Child
Poverty Delivery Plan and the development of future annual Local Child
Poverty Action Plans.
5.4  In the course of 2025/26 we will undertake further research with parents,
children and young people from Priority Family Groups, and consult with other
key stakeholders to review the Child Poverty Delivery Plan 2022 – 2026 and
develop a further iteration of the plan for 2026 – 2030. 
6.  Conclusion 
6.1  We know that 5,155 children across Perth and Kinross are living in poverty.
The negative impacts of poverty cannot be underestimated, both in the short
and the longer term. This report sets out the Councils continued commitment
to tackling child poverty in the area.
Page 122 of 396

Page 123

It demonstrates our understanding of child poverty in Perth and Kinross, the
key areas of focus and the actions that we will continue to progress with our
partners to ensure that child poverty is minimised and that all our children are
supported to live well. 
6.2  The Poverty Working Group will continue to oversee and monitor progress
towards delivery on commitments in the Child Poverty Action Plan 2025/2026
and will report on the same to Perth and Kinross Council in the next LCPAR
report in 2026.  
6.3 The Poverty Board will provide scrutiny of the implementation of the Local
Child Poverty Delivery Plan 2022-2026 and each annual Child Poverty Action
Plan. 
6.4  A new Child Poverty Delivery Plan will be proposed to Perth and Kinross
Council in 2026. 
7.  Appendices 
• Appendix 1 – Local Child Poverty Action Report, 7th Edition 2024/25
with Child Poverty Delivery Plan 2022 – 2026 and Children’s Scorecard
4th Edition 2025. 
Page 123 of 396

Page 124

Page 124 of 396

Page 125

1 
Appendix 1 
Local Child Poverty
Action Report 
2024/25 and 
Local Child Poverty
Action Plan 2025/26
7th Edition  
6
Page 125 of 396

Page 126

2   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
Contents
Introduction ...................................................................................................................................................................................................... 4
Context ............................................................................................................................................................................................................. 7
What we did in 2024/25 to tackle child poverty ................................................................................................................................................. 9
Spotlight on Innovation and Good Practice ..................................................................................................................................................... 13
Targeting Positive Destinations - S3 Construction Academy, Perth High School......................................................................................... 13
Breadalbane Academy – Supporting Pupils to Access Free Bus Travel ...................................................................................................... 15
Futures for Families .................................................................................................................................................................................... 17
The Big Hoose ............................................................................................................................................................................................ 19
Update from the Supporting People, Addressing Need programme ............................................................................................................ 21
FORT Referral Management System .......................................................................................................................................................... 22
Perth Welfare Society – Wellbeing of Muslim Women ................................................................................................................................. 25
Families Empowering Communities ............................................................................................................................................................ 26
Infant Feeding – Emergency Pathway ......................................................................................................................................................... 27
Development of Toolkit ............................................................................................................................................................................... 27
Christmas Family Hampers 2024 ................................................................................................................................................................ 29
Tayside Financial Well-being Project – Aberlour and Dundee, Perth and Kinross and Angus Councils ....................................................... 31
APPENDIX 1 ...................................................................................................................................................................................................... 33
Child Poverty Delivery Plan 2022-2026 .............................................................................................................................................................. 33
Strategic Aims ................................................................................................................................................................................................ 33
Objectives ...................................................................................................................................................................................................... 33
Our Approach ................................................................................................................................................................................................. 34
Children’s Scorecard 2025 ................................................................................................................................................................................. 33
Key Achievements .......................................................................................................................................................................................... 34
Child Poverty .................................................................................................................................................................................................. 36
Page 126 of 396

Page 127

Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 |   3 
Child Poverty at Locality and Ward Levels ...................................................................................................................................................... 37
Income from Employment ............................................................................................................................................................................... 38
Dignified Living ............................................................................................................................................................................................... 39
Survive and Thrive.......................................................................................................................................................................................... 42
Feedback from Parents .................................................................................................................................................................................. 43
Service Response .......................................................................................................................................................................................... 45 
Page 127 of 396

Page 128

4   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
Introduction
Perth and Kinross have made encouraging progress in the latest
child poverty figures which show a notable improvement in
outcomes compared to the national picture. In 2024, the proportion
of children living in relative poverty after housing costs (AHC) in
Perth and Kinross has fallen to 19.2% (5155), down
from 21.7% (5750) the previous year. This 2.5 % reduction is
particularly significant when viewed against the Scottish average,
which currently stands at 23%. Historically, Perth and Kinross has
maintained a child poverty rate approximately 2% below the
national average but this year, the gap has widened to 3.8%, nearly
double the previous margin which is positive progress in the fight
against child poverty in Perth and Kinross.
Where Perth and Kinross historically has ranked between 10th and
12th for lowest child poverty rates amongst local authorities, we
have now risen to 7th place. While these developments are
promising, we remain cautiously optimistic. We will continue to
monitor data closely to confirm that this is a sustained trend rather
than a short-term fluctuation.
It is estimated that 1,959 children in Perth and Kinross are pushed
below the poverty line due to housing costs alone. This underlines
the importance of continued action to address housing affordability
as a key driver of child poverty.
At the time of writing, 590 families with children are affected by the
two-child benefit cap, this reduces family income significantly and
impacts adversely on all children in the affected families. 
The progress made is the result of a sustained, collaborative, cross-
sector effort. The reduction in child poverty rates can be attributed
to the combined efforts of Council and NHS services, Community
Planning Partners, and the third and community sectors. The Anti-
Poverty Task Force has played a pivotal role in providing strategic
leadership, while the deepening collaboration between Perth and
Kinross Council and NHS Tayside has strengthened our collective
response to poverty and inequality.
As we move forward, we remain committed to building on this
momentum ensuring that every child in Perth and Kinross has the
greatest opportunity to thrive, regardless of their background.
Thomas Glen
Chief Executive, Perth and Kinross Council 
Nicky Connor
NHS Tayside Chief Executive, Nicky Connor. 
Page 128 of 396

Page 129

Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 |   5 
This report has been jointly produced by Perth and Kinross
Council and NHS Tayside; it reflects the wider collaboration
with our Community Planning Partners and a deepening
engagement with our key stakeholder groups. 
It is our seventh Child Poverty Action Report and includes
actions taken to implement our Child Poverty Delivery Plan
2022-2026. 
The Child Poverty Delivery Plan aligns with Best Start, Bright
Futures: tackling child poverty delivery plan of the Scottish
Government which covers the same period. It connects to and
will deliver a rights-based approach as set out in the UN
Convention on the Rights of the Child with reference to those
articles which relate to child poverty:
• Article 3 (best interests of the child)
• Article 6 (life, survival and development)
• Article 12 (respect for the views of the child)
• Article 26 (social security)
• Article 27 (adequate standard of living).
It is underpinned by GIRFEC (Getting It Right For Every Child)
the national approach in Scotland to improving outcomes and
supporting the wellbeing of children and young people by
offering the right help at the right time. It supports children and
their parents to work in partnership with the services that can
help them. The GIRFEC approach is child-focussed and uses
the SHANARRI wellbeing indicators, to identify need and
measure progress. 
It also aligns with the Scottish Government’s No One Left
Behind approach to employability support. In particular, the
growing emphasis on supporting parents into work, and to
increase their earnings in work.
It will contribute to the delivery of Scotland's Promise to Care -
Keeping the Promise to young people that they will grow up
loved, safe and respected and relates to the delivery of Plan
21-24 which requires organisations to demonstrate how they
are ensuring that they play a part in mitigating the impacts of
poverty. 
It flows from the Perth and Kinross Corporate Plan 2022/23 -
2027/28 which has Tackling Poverty as a corporate priority
and the Perth and Kinross Community Plan 2022-2032
adopted by our Community Planning Partners which sets
Reducing Poverty as a strategic priority.
Although created after the Child Poverty Delivery Plan, the
Anti-Poverty Task Force has now adopted a Poverty Strategy,
which was endorsed by Perth and Kinross Council, which
aligns with the approach and objectives in the CPDP (2022 –
2026). The Anti-Poverty Task Force’s Action Plan has now
been agreed. 
Page 129 of 396

Page 130

6   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26  Page 130 of 396

Page 131

7 
Context
Perth and Kinross Council has adopted a place- and people-
based, whole systems approach to child poverty reduction.
This strategy is informed by lived experience and aims to
support families in crisis toward sustainable livelihoods. Since
2022, this approach has delivered:
• A 3% reduction in child poverty, widening the gap
between local and national averages to 3.8%.
• An improvement in Perth and Kinross’s ranking from
10th–12th to 7th among Scottish local authorities.
Integrated Holistic Support
Collaboration across public, third, and community sectors has
enabled integrated service delivery focused on:
• Employability
• Income maximisation
• Wellbeing
The Anti-Poverty Task Force provides governance, while the
Children’s Scorecard tracked service responsiveness and
progress against targets.
Strategic Alignment
All partner organisations prioritised addressing the immediate
concerns of parents and supporting them to move out of crisis
and move towards more sustainable livelihoods This involved
improved access to:
• Affordable housing
• Flexible childcare
• Transport
• Employability support
• Wellbeing services
The Support and Connect programme trained and continues
to train frontline workers to deliver holistic support beyond
crisis intervention.
Lived Experience and Frontline Insight
Wel listened to Priority Families to understand poverty’s
impact and where they felt services were providing incomplete
or inadequate support. Frontline workers identified the
following issues as key:
• Lack of affordable housing and childcare
• Limited transport connectivity
• Need for real Living Wage employment
• Data-driven resource allocation
• Health and wellbeing 
Page 131 of 396

Page 132

8   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
These insights informed strategic priorities and service
redesign. 
Governance and Partnership
Perth and Kinross Council played a convening role, funding
the Anti-Poverty Project Manager’s post with the Anti-Poverty
Task Force and facilitating multi-disciplinary locality teams
with staff drawn from a variety of public sector organisations. 
The Community Planning Partnership (CPP) embedded
poverty reduction into its Local Outcome Improvement Plan,
aligning it with employment and wellbeing.
PKAVS hosted the Anti-Poverty Task Force and coordinated
emergency support through initiatives like The Big Hoose,
which supported over 2,300 families and 4,600 children. 
Operational Delivery
Local Employability Partnership supported over 2042 adults
into employment. ((2018 – 2024)
• PKC’s Local Housing Strategy delivered 1069 new
homes and maintained affordable rent levels. (2020 -
2025) 
• Income maximization efforts yielded £25.5M in client
financial gain via PKC Welfare Rights and Perth CAB.
(2022-2024)
The SPAN Programme, which has to date referred 316
people for help and support.
• Families Empowering Communities funded early
intervention and wellbeing activities for 136 families,
90% from Priority groups.
• The Cash First Partnership provided crisis support and
entry into broader services. 
Systemic Transformation
Inspired by John Paul Lederach’s peacebuilding methodology,
the Council’s whole systems approach emphasizes:
• Relationship-building
• Local agency
• Multi-level collaboration
This fosters dignity, resilience, and long-term change.
Preventative spend research is underway to identify which
externally funded elements can be mainstreamed due to cost
savings. 
Measuring Impact
The Children’s Scorecard, now in its fourth year, tracks:
• Poverty indicators (employment, cost of living, benefits)
•  Progress on priorities identified by families
The 2025 Scorecard includes peer comparisons, trend
analysis since 2018, and alignment with the Scottish
Government’s child poverty dashboard. 
Conclusion
Perth and Kinross’s whole systems approach has built a
resilient ecosystem of partnerships, governance, and data-
driven service delivery. The shift from crisis response to
sustainable support is now embedded across sectors,
ensuring that child poverty reduction remains a strategic
priority.  
Page 132 of 396

Page 133

9 
What we did in 2024/25
to tackle child poverty
Workstream 1 - Employment
Includes addressing structural barriers to
employment identified by parents and
frontline works – access to affordable
childcare, housing and transport. 
It also includes skills development, confidence
building and employability support to enable
people who want to work acquire the
necessary skills to get work, sustain
employment or move to a better job. 
Areas for Development
• Closing the gender employment and pay gaps
• Greater focus on the supply side of labour ensuring there
are sufficient good jobs created within the local economy or
accessible within the travel to work area. 
Page 133 of 396

Page 134

10   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
Workstream 2 – Dignified
Living
This includes income
maximisation, crisis support and
providing a one-door approach to
the provision of holistic help and
support. 
It aims to enable parents and
families to move beyond crisis
support to sustainable livelihoods
by providing access to holistic
support. The entry point for most
families will be crisis support- but
we aim to offer them access to
employability and wellbeing
services to change their
prospects for the future. 
Areas for Development
Roll out the Support and Connect
training to all frontline workers in
Perth and Kinross
Page 134 of 396

Page 135

Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 |   11 
Workstream 3 – Survive
and Thrive
This includes wellbeing and
whole family support. It aims
to improve the wellbeing of
children and parents affected
by poverty so that they can
take advantage of
opportunities for personal
growth which enhances
learning and leads to better
employment prospects. 
Areas for Development
• Review Council Funding for
Emergency/Crisis Support delivered by
third sector and community organisations
• Undertake research with advocacy groups
working with Priority Families to check that
they are accessing the services and
support they require. 
Page 135 of 396

Page 136

12   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
Work - providing opportunities and support needed to enter, sustain and progress in work
Dignified Living – support to families to lead dignified lives and meet their basic needs
Survive and Thrive
What are we
going to do to
tackle child
poverty in
2025/26? 
• Identify and promote best practice on delivering the real Living Wage,
championing the benefits to local employers. 
• NHS Tayside will use its strategic influence to tackle poverty and health
inequalities
• Implement Perth and Kinross Economic Wellbeing Strategy to ensure
investment is used in areas of disadvantage and actions included to tackle
child poverty
• Extend childcare to support parental employment through wraparound
care, community childminding and strong start2
• Work with the Local Employability Partnership to improve access to
employment and representation in the NHS workforce amongst priority
groups
• Support parents who want to become self-employed childcare providers to
gain qualifications
• Support parental employment through the Futures for Families project to
support partners into skills and employment outcomes that will increase
their earning potential
• Meaningfully engage with business community under the Futures for All
Incentive project to create new, flexible and sustainable jobs for priority
parents and people with employment barriers.
• Accelerate delivery of 1050 affordable homes over 5 years
• Buy back 40 former council houses
• Provide support to community-led housing initiatives
• Invest £4 million to upgrade Gypsy Traveller site with new energy efficient
accommodation
• Analyse data relating to the uptake of Council concessions and plot unmet
need to local school catchment areas
• Target income maximisation, employability offers and social prescribing to
schools with the greatest levels of unmet need 
• Develop locality based, multi-disciplinary teams to support and connect
parents and families to services 
• NHS Tayside will promote the Warmth Matters app and website to enable
frontline workers to signpost people to a range of services and support 
• Work in partnership with Perth and Glenochil Prisons to provide an
accelerated welfare rights service to people on release from prison 
• 
• Develop a joined-up approach to crisis intervention which is underpinned by
Cash First including a new referral management system
• NHS Tayside will increase the number of health-placed income maximisation
referrals to welfare/energy advice services. This will include new work where
children are severely disabled or have complex needs 
• Work with partner organisations to put in place robust referral pathways
around health and wellbeing support for parents and their children
• Work to maximise the impact of Pupil equity funding on children
experiencing educational disadvantage because of poverty
• Ensure there is continued promotion of evidence-based interventions to
target aspects of literacy, numeracy and health and wellbeing 
• Embed the use of the Closing the Gap tool to create a holistic planning and
impact measurement tool
• Report regularly, analysing progress, to the Raising Attainment Board
• Develop and implement a refreshed Raising Attainment Strategy for 2023 -
2026 
• Work in partnership with local community organisations to deliver Fuelled
for Fun programmes to provide activities and food to school age children
during school holidays
• Work with Tayside Contracts to increase the uptake of free school meals
• Work with Gypsy Traveller families to support their child’s development,
expanding on the provision of starter sacks. 
• Implement the Perth and Kinross Corporate Parenting Plan 21-24 
Page 136 of 396

Page 137

Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 |   13 
Spotlight on Innovation and Good Practice
Targeting Positive Destinations - S3 Construction
Academy, Perth High School 
As part of the community benefits associated with the contract
for the construction of the new Perth High School building,
Robertson’s Construction were approached to develop a pilot
work experience programme for eight S3 pupils.
As communities seek to recover and rebuild following the
Covid-19 pandemic, schools across Scotland have reported a
negative impact on attendance and “in-school truancy”,
engagement, mental health and positive destinations.  Data
shows that S3 pupils have the lowest attendance across PKC
and within the context of Perth High School a number of
young people had been identified as at risk of not achieving a
positive destination.
The Construction Academy was offered from March to June
2024, one morning per week for 17 weeks.  The eight young
people selected had expressed interest in a career in the
construction industry but were considered to be at risk of not
achieving in school. The selection process involved a range of
stakeholders including school staff, representatives from the
construction company, the young people themselves and their
parents.
The young people had the opportunity to get a very genuine
experience working alongside Robertson’s and supply chain
staff on a site close to the new build. 
Page 137 of 396

Page 138

14   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
Outcomes
• Almost all young people involved in this project
have gone on to secure places on the Perth UHI
Multi-skills link course for S4.  The one S4
participant has secured a full-time college place for
multi-skills and a construction apprenticeship. 
• Three young people have been specifically
identified by Robertson’s staff as having real
potential and dedication and will have the
opportunity to lead and mentor the next cohort of
trainees.  This will allow them to maintain their
relationship with the team with potential
opportunities for apprenticeships/summer programs
when they are sixteen. 
• All of the young people involved have reported
having a greater understanding of the construction
sector and the world of work.  
• All young people involved feel that this will be
beneficial to them in terms of being ready to take on
a job or training in Construction. 
“This is amazing, I never would have thought that we could
have used a cement mixer at school and been able to lay
blocks and bricks properly.  I kind of thought we would just
have to watch, but even getting all the proper gear like the
steel toe cap boots and jackets has been great.  It’s not just a
school thing; it’s like really being on a site”
“I’m much more confident about trying things now because I
know I can do it”
“When we were first doing it, some stuff was really hard but
we’re better now.  Getting the cement in the mixer was much
harder than it looked!” 
Page 138 of 396

Page 139

Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 |   15 
Breadalbane Academy – Supporting Pupils to Access
Free Bus Travel
Background
A Scottish Government study published in September 2021
concluded that people living in rural areas are significantly
affected by the cost of travel. They are far more dependent on
cars than those in urban areas and they need to travel further
to access work, retail, study and leisure activities. 
In trying to address this inequality and as part of its climate
emergency plans, the Scottish Government launched its free
travel scheme for under 22’s in 2021, enabling young people
aged 5 to 21 to travel on most bus services in Scotland for
free using their National Entitlement Card (NEC). 
However, the NEC is tricky to apply for online and as a result
we believed that young people and their parents were missing
out on the potential benefits. We believed that by hosting an
in-school application event, we would break down barriers by
facilitating applications for new/replacement cards and adding
free bus travel to existing cards. 
What did we do?
We surveyed all pupils in September. It was clear that a
number of pupils had lost/damaged their National Entitlement
Card or were missing the free bus travel element. 
The decision was made to host an in-school event to help
pupils apply for a new/replacement NEC card and to add free
bus travel to existing cards. 
This required support from Campus Staff as well as the PKC
Concessionary Travel Team.
• In October, a letter was sent to all Primary and
Secondary parents/carers sharing the benefits of the
National Entitlement Card and announcing the in-
school event. 
• Parents/carers were asked to complete an online form
to determine the number of pupils requiring an
application to be processed on the day allowing us to
allocate adequate staffing resources. 
• As online responses were received, NEC application
forms were printed from SEEMIS and passed to
parents/carers for completion and return. 
• On the day of the event, applications were sorted by
year group and class. Pupils were called down to the
event to have their applications processed, returning to
class within 10 minutes, causing minimal disruption to
learning
• Drop-in access to the event was also available during
morning interval and lunch
Page 139 of 396

Page 140

16   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
Impact
• Over the course of the event, the Concessionary Travel
Team processed 150 applications for Primary and
Secondary pupils.
• The event was deemed a huge success.
• Positive feedback has been received from parents who
had found the application website difficult to navigate.
• By hosting the event, we have facilitated the application
process for a number of pupils who would not have
otherwise chosen to submit one, enabling access to the
benefits that the card offers.
Next Steps
• During the day, the team spoke about the benefits of
holding this event on-site and we agreed that it would
be a useful exercise to repeat each year, around the
time of the timetable change, in preparation for the P7
transition and before the summer holidays, to ensure
pupils can make the most of their free bus travel
entitlement. 
• We also agreed to continue accepting applications from
pupils throughout the school session, letting parents
know it is not too late to request an application form
which, once completed, is forwarded to the
Concessionary Travel Team on their behalf.
• We look forward to repeating the event next year.  
Page 140 of 396

Page 141

Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 |   17 
Futures for Families
Futures for Families is a pioneering initiative by the skills &
employment support team @Perth & Kinross council that
takes a holistic, family-centred approach to tackling child
poverty and employability challenges. Unlike traditional
services that operate in silos, this project integrates support
across multiple sectors—skills development, childcare, digital
inclusion, and self-employment—through a single point of
contact: a dedicated key worker. It’s the only local
employability programme fully focused on families and
parents, offering tailored support and flexible funding solutions
such as the elev8 training and self-employment grants.
The project was designed to address the complex and
overlapping barriers faced by families in or at risk of poverty—
such as lack of childcare, financial instability, mental health
challenges, and limited access to training or employment. By
streamlining access to services and providing personalised,
sustained support, futures for families has successfully helped
individuals overcome these barriers and transition into
meaningful employment or self-employment.
Successful Outcomes
Since its launch, the project has supported:
• 376 clients 
• 141 individuals into sustained employment
• 45 clients into self-employment in 2024/25
• 200 clients accessed training and qualifications
SUPPORTING A PARENT WITH 3+ CHILDREN  
A parent with 3+ children was referred to Futures for Families
team by Skills Development Scotland. The parent supported
by has a disabled partner who is unable to work.  This put
financial strain on the client, as they were looking to advance
in their career but as they were the sole earner, further
investment in their career was beyond their means. 
Futures for Families provided support with the use of the
Elev8 Training Grant to support the client to gain the
qualification that would support them to be able to be in a
higher paid job role and open more doors for the client to
continue to advance in their career. 
Our client has now been able to gain a membership within
Health and Safety and is being considered for a technical
membership. We were delighted to hear that they have
managed to successfully advance in their career, and this has
opened more doors for the client.  
“I wanted to take a moment to say a heartfelt thank you for the
incredible support you provided in funding my NEBOSH
Page 141 of 396

Page 142

18   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
General Certificate in Occupational Health and Safety. Your
belief in me and investment in my future has made a real
difference in my life, and I’m truly grateful.
Thanks to your help, I was able to enrol on the NEBOSH
course, dedicate myself fully to the training, and ultimately
achieve the qualification.
Since completing the course, I’ve been able to gain
membership with the Institution of Occupational Safety and
Health (IOSH), which has been a significant step forward. 
This opportunity has opened up new doors and given me a
clearer path toward a stable and rewarding career. More than
that, it has shown me what’s possible with the right support. I
now feel empowered to continue developing my skills and to
contribute meaningfully to improving workplace safety.” 
Client X and the Singing Mamas
Futures for families supported Client X on her journey into
Self-employment, alongside support from our colleagues in
Business Gateway. Client X completed her training with
Singing Mamas and was successful at gaining funding
through our Elev8 training grant, which helped with the
purchase of essential equipment for Client X’s business
startup. 
Client X has been successfully running two groups a week
alongside her volunteering commitments and providing much
needed support out and about in the community for women
and babies. 
“I have always sought to do work that I find satisfying and
purposeful in terms of supporting people with life’s struggles.
whilst singing mamas will allow me to do this, it is also doing
this in a very positive way that is specific and straightforward,
and mostly- fun!
I also hope that my work with singing mamas will support my
husband to have more of a work life balance when I am
contributing to the household finances. he has a very busy
and stressful job where there is little room for flexibility or time
for himself so I hope that my entry into work and earning will
allow him some more breathing space.
My children will greatly benefit from the positive mental health
benefits I feel singing mamas will lead to in my own life. they
will see me gaining joy from my work and I hope that I will be
a positive role model for them. I also believe that feeling
fulfilled in myself will help me to feel calmer in my family life.”  
Page 142 of 396

Page 143

Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 |   19 
The Big Hoose
The Big Hoose supports children and families in Perth and
Kinross living in poverty with access to free everyday
household items such as toiletries, cleaning products, bedding
and more. It is supported by the Gannochy Trust, Perth and
Kinross Council and hosted by PKAVS. 
To date it has processed 810 referrals and 57000 items have
been distributed to 2560 families with 4950 children. 
Perth and Kinross Schools are Big Hoose partners – and
each week they receive inventory updates letting them know
what is available. The schools have run seasonal campaigns
with the Big Hoose which have included promoting the
Kelloggs Breakfast Club where free breakfasts were provided
by Morrisons Cafes and a Spring Multi-sports club which
provided free sports and lunches for children aged 5 – 14. 
The schools were able to access support from the Big
Hoose in different ways.
Inch View Primary School – Universal Access to
Essentials
Inch View Primary School integrated the Big Hoose Project
into its wider equity strategy by offering homewares directly
from the school reception. This initiative complemented other
supports such as a breakfast café, pre-loved uniform station,
and fruit snacks. Staff reported that these combined efforts
helped reduce lateness and absenteeism, ensuring that all
pupils could start the day with dignity and readiness to learn.
St Stephen’s RC Primary – Confidential Family Support
At St Stephen’s RC Primary, a community learning assistant
used the Big Hoose Project to provide both essential and non-
essential items to families. The uptake was described as “very
good,” and the school plans to continue offering this support
regularly. Importantly, the process was designed to be
confidential, preserving the dignity of families while
strengthening community trust.
RDM Primary – Hygiene and Wellbeing Support
RDM Primary School accessed the Big Hoose Project to
support families with basic hygiene needs. This was part of a
broader strategy to increase attendance at extracurricular
activities and improve pupil wellbeing. Staff noted increased
engagement with families and a more inclusive school
environment because of this support. 
Page 143 of 396

Page 144

20   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
Balbeggie Primary – Uniform Equity Through “The Social
Flock”
Balbeggie Primary School used the Big Hoose to support its
“Social Flock” initiative, which provides recycled uniforms to
families. This helped increase the number of children wearing
school uniform and reduced financial pressure on families.
The school also promoted the initiative through newsletters
and parent events to ensure accessibility.
Conclusion
While exact figures on the number of families supported
between August 2024 and June 2025 are not available, the
Big Hoose Project has clearly made a meaningful difference
across Perth & Kinross. Schools have reported improved
attendance, stronger family engagement, and greater dignity
for those receiving support. The project remains a vital part of
the region’s efforts to reduce the impact of poverty on children
and families.  
Page 144 of 396

Page 145

Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 |   21 
Update from the Supporting People, Addressing Need
programme
Directory of Services
A directory of services for Family
Support1 was created in January
2024 and has been updated on a
regular basis as further
organisations requested to be
included.  This directory is hosted on
the PKC website and has been
extensively publicised with partners.
Between 1 April 2024 and 31 March
2025, the directory had 2630 tracked views with 1577
individual users.  It should be noted however that due to
settings within the website linked to GDPR, we can only track
viewers who opt into tracking.  As a result, it is likely that
these numbers represent an underestimation of the number of
views the website has received. 
1 Whole family support - Directory of services - Perth & Kinross Council
2 national-guidance-child-protection-scotland-2021-updated-2023.pdf  
para 4 3
Support and Connect Programme
The Support and Connect Programme has 3 components
• Social Needs Screening Tool
• FORT (Fast online Referral Management System)
• Training for frontline workers 
It has been funded by the Scottish Government’s Child
Poverty Accelerator Fund, the Whole Family Wellbeing Fund
and Perth and Kinross Council. 
Social Needs Screening
Social needs screening has been identified by Scottish
Government2 as a means of identifying unmet need and
connecting individuals and families to help and support.  The
toolkit can be used by frontline workers to initiate open
conversations with clients about their personal circumstances
(focused on financial resources, housing, utilities, food
3insecurity, employment and exposure to violence), and to
identify if they have all they need to meet basic needs. 
Page 145 of 396

Page 146

22   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
FORT Referral Management System 
The FORT Referral management System provides
• A "one-stop shop" for referrals and service information.
• An internal system and e-mail messaging for referral
communication.
• The ability to manage capacity and edit directory details.
• An online and centralised system, making it accessible.
• The ability to make onward referrals easily.
• Help for partners to discover and connect with services.
• Minimal referral forms making the process of connecting
people to help and support time-effective, and user-
friendly.
There were also some concerns raised about the system,
and as a result we have developed an action plan that
identifies measures to address these, including: -
• Enhancing training effectiveness (how training is delivered
including online options, train-the-trainer approaches and
briefing sessions for team leaders).
• Increase visibility and engagement with FORT (publicity,
updates on newly added services, case studies and
success stories, identify new users)
• Foster consistent and widespread adoption of FORT
(FORT “Champions”, integration into workflows and
processes, standardising of referral processes)
• Improve user experience and reduce technical barriers
(work with Advice Infrastructure to ensure appropriate
security measures, improved login experience and user
interface design)
There are currently 56 partner organisations on the system
within Perth & Kinross and 78 frontline workers have received
training and accessed the system.  
Page 146 of 396

Page 147

Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 |   23 
316 referrals have been made using the system, with some
organisations choosing to only accept referrals from  Fort,
whilst other can both make and receive referrals.  
We continuing to work closely with stakeholders and partners
to develop a rollout to other departments and organisations
that work within Criminal Justice, Mental Health, Employability
and Education sectors.
System development
System development and training is planned for the upcoming
year, working to an action plan developed in collaboration with
partners. This is part of a phased development of the system
that aims to ensure that we are tracking the client journey, as
well as learning together and collaborating with partners to
build a network and increase the reach of the system (see
actions and next steps below).
FORT Partner Group
FORT Partners meet monthly to discuss issues relating to the
use of FORT, to share views on the user interface, and
training processes.  Presentations from groups who have
newly joined the platform raise awareness of the services their
organisations offer.
A Partner Networking and evaluation event was held on 29th
January, which gave the opportunity for FORT users to share
their experiences and evaluate the pilot phase of the project.
Positive aspects of the system were identified including: -
Page 147 of 396

Page 148

24   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
Support and Connect Training 
The aim of the training is to improve confidence amongst
frontline workers in having what can be challenging
conversations, and to ensure that they are aware of sources
of support for clients.  8 cohorts of training have been
completed over the funding period (September 2024 to March
2025). These have succeeded in building the connections
between services, raising awareness of the FORT system and
pathways to advice and help that can help those that
organisations are supporting. 
There have also been requests from specific teams to train
client-facing staff after managers/team leads have attended
training.  This includes the Perth & Kinross Council Central
Arrears Housing Team; Futures for Families Support workers,
PKAVS and the Fire and Rescue service, with training either
being delivered currently or in the planning stages for 2025-
26.
The directory component of Support & Connect4 is being
further developed in 2025-26, with the aim to incorporate local
organisations already listed on the Whole Family Support
Directory of services as well as FORT partners and make this 
4 Home (Support and Connect)
into a more targeted and searchable directory to allow
frontline workers and agencies to access help and support
quickly across the region. The aim is to create one place for
practitioners to search/filter for and find information that can
assist families and individuals with a range of issues -
including cost of living support, employability, wellbeing,
connections to support for families and more. 
Feedback from the Support & Connect sessions shows how
most participants recognised the value of the FORT referral
system in improving partnership and collaboration with other
organisation to support individuals and families.  
Page 148 of 396

Page 149

Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 |   25 
Perth Welfare Society – Wellbeing of Muslim Women
The Angel Share Fund provided by Perth and
Kinross Council enabled Perthshire Welfare
Society to provide safe spaces for Muslim
women who were seeking to improve their
mental health and wellbeing. 
91 women took part in the weekly sessions which covered
topics such as understanding trauma, coping with depression
parenting skills and how to access services and support.  
Friendship groups formed and women are now meeting up
with each other for coffee and a blether out with the structured
workshop sessions that were provided. 
Feedback was overwhelmingly positive
“Being a Muslim, I have been surrounded by religion, culture,
and restrictions. These sessions have made me realise there
is so much in me, but I have never had the confidence to
reach out or talk about how I am feeling. Thank you so much
for these sessions; I feel so much better and confident to
reach out when I need help”
"I learned so much during these sessions; I thought I wasn’t
important and that no one would understand me. I am so
happy I joined these sessions."
"I have made friends because of these sessions, and I feel I
am more than a wife and mum now."
Building on the success of the Women’s Wellbeing Sessions,
the group are launching a mental health project they have
called Empowered Minds.  They have also introduced weekly
walking groups which provide an opportunity for women to
reconnect and socialise in a supportive environment. 
Page 149 of 396

Page 150

26   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
Families Empowering Communities
Initially supported by Perth & Kinross Council in 2 locations
(Letham and Crieff), WFWF funding has enabled the Families
Empowering Communities project to be expanded in these
locations, and to be rolled out into 3 new locations (North
Muirton, Bertha Park and Blairgowrie), each of which have
been identified as areas with significant deprivation and/or
social inequality.  The project is designed to improve
wellbeing for families, increase availability and accessibility to
local support, and to reduce the number of families requiring
intervention from statutory services. 
The project makes use of the Place Standard Framework
which allows communities to identify how their experience of
place influences their health and wellbeing.  Engagement
activities are currently underway in each of the 3 new areas,
with families involved sharing their views and identifying areas
for change.  A number of universal community activities have
been organised which aimed to increasing visibility and
awareness of the project, and to build relationships across the
communities.
FEC offers a range of pathways to support families, including
one to one support for parents, whole family support, and
universal community activities. A local community space has
been established in each area, creating a welcoming
environment for families, and bringing services into the local
area (e.g. job clubs, support groups for young mums, and
drop-in sessions with other support organisations).  Families
are therefore more able to access support in their local
communities, in place and spaces that are free from stigma
and judgement.
Families Empowering Communities has supported 63 families
with 96 children in the past year. 
Page 150 of 396

Page 151

Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 |   27 
Infant Feeding – Emergency Pathway 
Following the launch of the UNICEF Guide to supporting
families with infants under 12 months experiencing food
insecurity in October 2022, Scottish Government recognised
action was required to develop a more tailored resource
relevant to stakeholders in Scotland.  Multi-agency workshops
were set up and by September 2023 a short life working group
was formed to develop the toolkit. This considered the
Scotland specific approach in relation to cash-first responses,
reducing the reliance on foodbanks, and ensuring that holistic,
wrap-around support was provided through existing
infrastructure supporting families facing money worries.  The
Toolkit was launched in February 2024 and was developed
through the lens of child poverty.
This work highlighted a number of enablers including but not
limited to, Child Rights being in law in Scotland, infants being
formally recognised as vulnerable and therefore a priority
group across national policies and frameworks in Scotland,
the extensive time and effort put in to coordinating key actors
and enablers across sectors, capacity building across
specialisms and the importance of the UNICEF Baby Friendly
implementation in the absence of adequate WHO code
legislation. 
The tools and resources are designed to be used by
welfare rights teams, health visiting and family nurse
partnership teams, midwifery, infant feeding, GP’s, public
health, social work, third and voluntary sector and
anyone else working with families with young children
and or during pregnancy. 
Development of Toolkit
The toolkit was developed through the lens of child poverty
and helps guide agencies and staff to provide support which is
appropriate to the needs of families, taking a cash first
approach. It explores how to support exclusively breastfed
infants who do not need formula milk, but the family may need
support in other ways to protect breastfeeding, or where the
infant is fed through a combination of breastfeeding and
Page 151 of 396

Page 152

28   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
formula milk, maximising breastfeeding through sustainable
support. 
NHS Tayside’s pathways focus on prevention. It is integral
that robust breastfeeding support is in place to ensure families
can meet their feeding goals and breastfeed for as long as
possible. A financial inclusion pathway for Maternity Services
and Health Visiting and Family Nurse Partnership Services
was developed to ensure families are supported before they
reach crisis. The pathway is universal, so everyone is
included in the financial inclusion pathway to reduce the
stigma, and at multiple time points during the perinatal period.
Referrals are then made to Welfare Rights, with a focus on
the importance of referring during the antenatal period to
ensure support is in place prior to babies’ arrival. A crisis
pathway has also been developed called the ‘Tayside Infant
Food Insecurity Pathway’ and is now implemented to meet the
immediate need for first stage formula in a crisis situation
prioritising a cash first approach. 
Data
The importance of data and collating data sources to
understand where and how families with infants are being
supported, and the responsiveness of that support is vital to
making a difference in these families’ lives. Data on this
particular group is limited, and we are working on gathering
data including through implementation of the Toolkit.
Learning and Impact
• It was important to have a varied range of stakeholders
that helped to put this resource together and the
organic relationships that formed from this.
• There was no additional investment provided as part of
the Toolkit development or to support implementation
• The ongoing support from various stakeholders on the
use of the Toolkit has been invaluable.
• Do not underestimate the time it will take to develop
and implement pathways of support
• Training is required for social work/3rd sector etc. on
infant nutrition and key public health messages related
to this.
• There is no ‘one size fits all’ approach but there are
common tools and messages.  
Page 152 of 396

Page 153

Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 |   29 
Christmas Family Hampers 2024 
In previous years, various organisations across Perth and
Kinross independently applied to Fuelled for Fun (FIHP) to
provide Christmas food hampers. While this benefitted many
families, it also led to duplication, with some families receiving
multiple hampers. Due to GDPR restrictions, organisations
couldn’t share application data. To address this, a
collaborative approach was introduced in 2024, streamlining
the process through a single application system and localised
distribution.
Participating Organisations
The initiative brought together a wide range of partners:
• Perth and Kinross Council Services: Parenting &
Family Learning Team, Childcare Strategy Team,
Community Link Workers, Community Wardens, and
Criminal Justice (OWLS).
• Third Sector Organisations: Logos, Letham4All, Big
Hoose, Broke Not Broken, PKAVS, NHS, Buttons &
Bows, and Discover Blairgowrie.
• Business Partner: British Gas.
Professionals working with families submitted applications on
their behalf, based on their knowledge of the family’s needs.
Families were not means-tested but had to consent to the
application.
Funding and Reach
FIHP funding enabled the provision of 315 hampers. A total of
401 applications were received, including 14 duplicates,
resulting in 387 unique family applications, supporting 795
children. An additional £3,000 from the Poverty Board
ensured every eligible family received a hamper.
Hamper Contents and Support
Each hamper included a wrapped, age-appropriate family
board game to be enjoyed on Christmas Day. Envelopes were
added with a festive message, information on holiday support
services (via Welfare Rights), and Play Z cards. OWLS
supported the wrapping and envelope preparation. Larger
families received increased quantities of key items.
The Big Hoose contributed essential household items, helping
families redirect their limited funds to other needs. Buttons &
Bows provided nappies for families with infants under one
year old. 
Page 153 of 396

Page 154

30   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
Distribution Model
Applications were sorted into five geographical areas for
efficient local distribution:
• Kinross-shire: Managed by Broke Not Broken.
• Blairgowrie: Hampers assembled at Discover
Blairgowrie; distributed by British Gas and PKC staff.
• Crieff/Auchterarder: Logos hosted and helped
distribute hampers with PKC staff.
• Perth City: Perth Autism Support provided space;
Letham4All and PKC staff handled distribution.
• Other Areas: Hampers distributed from Perth
Grammar School by PKC staff.
Impact
The Christmas hampers provided vital support during a
financially challenging time, offering both nutritional relief and
emotional uplift. The application process, based on
professional insight rather than benefits eligibility, ensured
support reached families in genuine need. Feedback from
both professionals and recipients has been overwhelmingly
positive, highlighting the value of this collaborative,
community-driven initiative. 
Page 154 of 396

Page 155

Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 |   31 
Tayside Financial Well-being Project – Aberlour and
Dundee, Perth and Kinross and Angus Councils 
The Tayside Family
Financial Well-being Project
is a collaborative initiative
aimed at supporting families
in financial distress across
the Tayside region. The
case study highlighted the
challenges families face, especially with public debt—75% of
families in the region owed significant debt to public bodies
such as the Department for Work and Pensions (DWP), local
councils, and housing associations. The project sought to
provide both practical and financial support to help families
not only manage their debt but also improve their overall well-
being.
Through partnerships with local authorities (Dundee, Perth
and Kinross, and Angus Councils), welfare services, and
community-based organisations, the project leveraged
existing resources to provide holistic, family-centred support.
This included a debt relief fund, backed by the Robertson
Trust, that helped families clear unmanageable public debt
and improve their financial stability.
Challenges Faced:
Complexity of Public Debt: Families often faced multiple
layers of debt, making it difficult to pinpoint effective solutions.
The bureaucratic nature of public debt collection added to the
stress, creating barriers to communication and support.
Stigma and Fear: Many families felt ashamed of their
financial situations, which discouraged them from seeking
help. The fear of further sanctions or legal repercussions from
public bodies prevented open discussions about their debts.
Resource Limitations: There were inherent limitations in
funding and resources available to tackle the scale of the debt
issue. The project had to be strategic in leveraging existing
community resources without duplicating efforts.
Innovative Approaches and Outcomes
Collaboration Over Competition: By forging strong
partnerships with local authorities (Dundee, Perth and
Kinross, and Angus Councils), welfare services, and
community-based organisations, the project prioritised
collective problem-solving. This collaboration allowed
stakeholders to pool resources and expertise, fostering a
supportive network that addressed the complexities of public
debt.
Page 155 of 396

Page 156

32   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
Creation of a Debt Relief Fund: Backed by the Robertson
Trust, the project established a debt relief fund that enabled
families to clear unmanageable public debt. This financial
support not only helped families regain financial stability but
also restored their trust in public services. As a result, families
became more willing to engage with welfare services,
reducing their reliance on high interest borrowing options that
often perpetuated the cycle of debt.
Holistic Family Support: Recognising that financial
assistance alone was insufficient, the project integrated social
and practical support services. This comprehensive approach
ensured that families received tailored assistance, including
budgeting workshops, mental health support, and access to
employment services. Families reported improved overall
well-being and increased confidence in managing their
finances.
Data-Driven Insights: The project collected data on family
experiences and outcomes, which informed ongoing
adaptations to the programme. This focus on evidence
allowed for a responsive approach to the specific needs of
families, ensuring that interventions were relevant and
effective. 
Page 156 of 396

Page 157

33 
APPENDIX 1
Child Poverty Delivery Plan 2022-2026
Strategic Aims
• To raise awareness about the causes and
consequences of child poverty.
• To foster social cohesion and reduce stigma
surrounding poverty for children and families.
• To reduce the negative effects of living in poverty for
children and families.
• To enable children and families to prepare themselves
for a life free from poverty.
Objectives
Work
Provide opportunities and support needed to enter, sustain
and progress in work 
(Employability and skills, housing and economic opportunity,
connectivity and childcare)
Sharpening Focus
• Supporting parents into work that pays the Real Living
Wage or more.
• Taking action to close the gender employment and pay
gaps.
• Addressing the challenges presented by rurality.
Dignified Living 
Maximise the support available to families to lead dignified
lives and meet their basic needs.
(Person-centred support, social security and income
maximisation)
Sharpening Focus
• Addressing the rural poverty premium.
• Addressing the needs of the Gypsy Traveller
community and other minority ethnic communities.
• Addressing stigma which prevents parents and families
from seeking help and support.
Survive and Thrive 
Page 157 of 396

Page 158

34   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
Supporting the next generation to survive and thrive.
(Education and Children’s Services, Health and Social Care) 
Sharpening Focus
• Closing the poverty-related attainment gap.
• Addressing the challenges faced by disabled young
people entering further and higher education and the
jobs market.
• Addressing mental health and wellbeing issues for
parents and children affected by poverty.
Our Approach
Deliver a one-Council, whole-family, whole-community
approach to connecting children and families to the help and
support they need to mitigate and move beyond poverty. 
Sharpening Focus
• Changing the way we work to use data-driven
approaches to identify and connect with families
affected by poverty.
• Offer no wrong door approaches to connecting families
to the help and support they need and want.
• Developing multidisciplinary, cross-organisational
working in teams at locality level to build inclusive
communities which strengthen the web of support on
offer to families and children affected by poverty. 
Page 158 of 396

Page 159

33 
Children’s Scorecard
2025 
4th Edition
Page 159 of 396

Page 160

34   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
Introduction
Perth and Kinross Council (PKC), in partnership with NHS Tayside, continues to
make progress in tackling child poverty. Each year we produce a Children’s
Scorecard to measure performance around poverty reduction and mitigation. The
Scorecard aligns with national strategies such as Best Start, Bright Futures and the
UNCRC, and reflects the voices of families with lived experience. In preparation for
the development of a 2nd Child Poverty Delivery Plan for Perth and Kinross 2026 –
2030, we expanded the Scorecard to include local data comparisons with peer local
authorities (where the data was available) and an analysis of trends since 2018 to
align with national and local delivery plans (2018 – 2022, and 2022 – 2026).  The
Scorecard this year takes a different format as it seeks to
• Identify areas where progress is being made
• Capture the learning from the Children’s Scorecard and identify those areas
which have contributed to poverty reduction 
• To make recommendations for action to be considered in the development of
the 2nd Child Poverty Delivery Plan for Perth and Kinross 2026 – 2030. 
A separate Children’s Scorecard Source Book provides all the background data
to support these conclusions.
Key Achievements
Child poverty reduced by 3.2 percentage points since 2018, outperforming the
Scottish average. Perth and Kinross has made encouraging progress in reducing
child poverty. The local rate is now 3.8% below the national average, nearly double
the previous gap of 2%. 
This improvement has taken the area’s ranking to 7th nationally (from 12th) for
lowest child poverty rates. While these results are promising, data will be closely
monitored over the next two years to ensure the improvement is sustained.  
The growing gap between child poverty rates in Perth and Kinross and the rest of
Scotland suggests that what is being done locally is delivering the differential impact
between poverty reduction achieved as a result of efforts of the UK and Scottish
Governments. 
Page 160 of 396

Page 161

Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 |   35 
What has achieved this change?
A strong web of organisations across the public, third and community sector have
been involved in developing an eco-system of support for children and families
experiencing poverty. 
The Anti-Poverty Task Force provided strategic leadership and actively promoted
cross sectoral engagement with poverty reduction across Perth and Kinross
There are now 278 organisations/services signed up to the Supporting People,
Addressing Need programme’s FORT referral management project - each one
engaged in offering holistic services to families spanning crisis support, income
maximization, employability and wellbeing. 
There is strategic alignment across Perth and Kinross Council, NHS Tayside and the
Community Planning Partners all of which are committed to delivering poverty
reduction and mitigation outcomes and are aligning resources behind this shared
strategic priority. 
The Children’s Scorecard measures 
1. Data and trends across the key drivers of poverty identified by the Scottish
Government – Income maximization through work, benefits and actions taken
to prepare young people to move beyond poverty to sustainable livelihoods. 
These are expressed in the three workstreams in Best Start, Bright Futures: -
• Providing Opportunities and Support for Parents to Enter, Sustain and
Progress in Fair Work
• Dignified Living - Increasing Incomes Through Social Security and Benefits
in Kind
• Survive and Thrive – Supporting families to escape poverty and increase
resilience to create conditions for long-term wellbeing and opportunity
2. Delivery - What has been delivered by Perth and Kinross Council to help
parents into work, ensure dignity and create the conditions for long-term
wellbeing and opportunity.
3. Responsiveness - How well our services have responded to challenges from
parents in the Priority Family groups for improvements in the services that
matter most to them. 
Page 161 of 396

Page 162

36   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
Child Poverty 
Page 162 of 396

Page 163

Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 |   37 
Child Poverty at Locality and Ward Levels 
Page 163 of 396

Page 164

38   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
Income from Employment 
Page 164 of 396

Page 165

Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 |   39 
Dignified Living 
Page 165 of 396

Page 166

40   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
Dignified Living (cont) 
Page 166 of 396

Page 167

Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 |   41 
Dignified Living (cont) 
Page 167 of 396

Page 168

42   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
Survive and Thrive 
Page 168 of 396

Page 169

Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 |   43 
Feedback from Parents 
Page 169 of 396

Page 170

Page 170 of 396

Page 171

45 
Service Response
Wellbeing
Parents asked for
• Help for families with
issues around mental
health or wellbeing. 
• Timely support for mental
health for children and
young people
experiencing
stress/distress. 
• Whole Family Support - Directory of Services was published in 2023 in response to parents’
requests for information – this has had 2600 views from 1570 unique users.
• Direct 1:2:1 support has been provided for 380 families and 760 individuals.
• Indirect support including one-off activities and signposting has supported over 2400
individuals.
• A practitioner network with over 100 members has been established and 3 network meetings
held.
• Support and Connect Training has been provided to 78 frontline workers across 9 training
cohorts.
• £4.3M has been earmarked for Whole Family Wellbeing support over a 5-year period 2022 to
2027.
• 136 families – 80% of whom were Priority Families were supported by the Parent and Family
Wellbeing team who delivered a range of programmes including Fearless Triple P (supporting
parents whose children have anxiety) Teen Triple P (supporting parents who are dealing with
challenging teenage behaviour), the Incredible years programme (strengthening parent-child
attachment) Anti natal Peep and Peep Learning together programmes (supporting parents to
bond with their child).
• School Holiday activities were provided to targeted families first and then offered to the wider
community, these offered holiday food and fun to 267 adults and 720 children. 
• Families Empowering Communities team supported 63 parents and 96 children with
counselling and ongoing support – 72% were lone parent families.
Page 171 of 396

Page 172

46   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
• 110 families and 145 children were supported by the COPE team who offer intensive family
support to families in their own homes. 
• A Family Advice and Community Connections Service was established and is being delivered
by Aberlour to provide support to parents, carers, children and young people on issues related
to whole family wellbeing. So far 84 families with 209 parents and children have used the
service. 
Stigma and Dignity
Parents asked
• To be treated with
empathy and
understanding 
• That service providers
understand it can be
difficult for parents to
admit they are struggling
to make ends meet and
ask for help. 
An online poverty awareness course has been placed on the PKC learning hub and has been
completed by 178 employees with a further 38 in progress. 
7 cohorts of Support and Connect training have been delivered to frontline staff with 78 frontline
workers completed training. This will enable frontline workers to engage in sensitive and
supportive conversations with people about their financial challenges, and to connect them to a
range of services and support provided by 56 partners across Perth and Kinross. In the first 6
months of operation, the Support and Connect programme has supported 316 families. 
Page 172 of 396

Page 173

Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 |   47 
Crisis Support 
Parents asked for
• Accessible information on
sources of help and support
for parents in crisis -
money, welfare benefits, in-
kind support.
• Help accessing support in
times of crisis when they
are experiencing stress.
• Key worker approaches -
where one person helps
source support across a
range of organisations. 
• Help with form filling and
navigating the welfare
benefits system.
• Cash First Approaches
Welfare Benefits
Checks/Money Advice
offered to Council
employees.
• Support for Foodbanks and
Community Groups offering
in-kind or crisis support. 
FORT/SPAN
Our Welfare Rights service generated an additional £9.2 million in benefits for Perth and Kinross
residents in 2024/25. This growth reflects enhanced service promotion and improved follow-up
efforts to better track financial outcomes. 
In 2024/25, we provided around £269k in support to over 1,400 households through the Financial
Insecurity Fund, targeting low-income residents and those without recourse to public funds.
Despite reduced funding and fewer applications, the Council more actively directed support, with
over 66% of payments going to households in rural areas facing financial hardship. 
We have built upon existing arrangements aimed at reducing barriers, raising awareness and
improving access to both Welfare Fund and Welfare Rights services for targeted communities of
interest. To support this in 2024/25 we:   
• Launched regular outreach at Double Dykes in Perth and partnered with Broke Not Broken to
support Gypsy/Traveller communities in Kinross. This improved engagement, built trust, and
strengthened relationships. 
• Ran a six-month outreach at @Scott Street in response to rising youth homelessness. Improved
referral rates and stronger partnerships made further outreach unnecessary, with Social Work
teams embracing online referrals and boosting client engagement to ensure full entitlements. 
• We partnered with YMCA, Creative Exchange, and others to enhance welfare rights support for
young people aged 16–25. 
• Worked with the Scottish Prison Service to provide a weekly Welfare Fund outreach service
within Perth prison.   
• We supported 1413 households to sustain their tenancy through our Tenancy Sustainment Fund,
Financial Inclusion Project and Think Yes budget. 
• We supported 35 households in the Private Rented Sector to sustain their tenancies and prevent
homelessness and hardship. 
Page 173 of 396

Page 174

48   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
Housing 
Parents asked for
• Increased supply of
affordable housing 
• Ensure houses are let in
a good state of repair.
• Improved
Communications. 
• Delivered a total of 264 affordable homes including 234 for social rented housing, and 30 for mid-
market rent. 
•  Delivered 37 Council new build homes and supported the completion of 70 new build affordable
homes in partnership with RSLs across 9 developments. 
• Delivered new supply across the Perth and Kinross area, both in urban 53% and rural 47% areas. 
• Purchased 116 buybacks to increase the Council’s housing stock. 
• Brought back 23 empty homes for people in need of accommodation through the Empty Homes
Initiative (EHI). 
• Continue to use our first Self-Build Register to inform rural housing need with 30 self-build
expressions of interested registered to date. 
•  Progressing 10 community-led projects with an estimated 60 homes planned. 
• Undertook a phase of consultation and design of a former primary school using our Sustainable
Inclusive Homes Net Zero Carbon Design Guide with the project intended to create 45 new build
affordable homes. 
• Undertook further feasibility for planning policy to be developed through LDP3 for Short Term Let
(STL) control areas.
• Delivered 4 additional new build homes to support individuals to live independently with outreach
support and technology through our Independent Living Panel.
• Rehoused 18 individuals through our Housing OT service into wheelchair accessible and adapted
housing.  Delivered 1 wheelchair accessible property and 12 adapted properties through our new
build programme.  In partnership with residents, delivered the first five of 20 new chalets to
Double Dykes to replace existing older accommodation, and began wider improvements to the site.
• Increased our work with SCARF to deliver our Home Energy Advice Team (HEAT) service,
providing free and impartial energy efficiency advice to 1638 households which resulted in savings
for residents.
Page 174 of 396

Page 175

Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 |   49 
• £441,681 invested in communal repairs for homeowners through our Missing Shares service. 
Supported repairs and improvements through a programme of 441 sensors being installed across
Council housing stock.  Delivered fibre to 63 new build properties in partnership with RSLs. 
Education  
Parents asked for
• Information about help
available to struggling
families
• Information on how to
access help around
school costs with
assurance that these will
be handled discretely and
sensitively
• Improvements in the
quality of school meals 
• Affordable after-school
provision to support
parental employment. 
• The Family Advice and Community Connections service which supports families across Perth
and Kinross is being actively promoted by schools. Through this service, any family with
children under the age of 18 can access information, advice, and connections to other helpful
services in their community. 84 families with 209 parents and children have used the service.
• A group of 5 targeted schools in areas with higher levels of deprivation are trialling the FORT
system provided by CAB. This will be rolled out more widely following evaluation of the pilot. 
• Staff from Rattray Primary School attended Support and Connect Training. As a result of
positive feedback from this, a bespoke session will be offered to school staff on the next in-
service day. This will ensure that staff are appropriately trained and supported to handle
requests for support sensitively and discretely. Should this be over-subscribed, priority will be
given to staff from schools ranked 1-10 in the area-based analysis of need. 
• Actions to reduce the Cost of the School Day have been included within school Quality
Improvement Plans for 2025/6 with 75% of schools publishing a Cost of the School Day Plan
for the first time. These include a number of initiatives to reduce barriers to participation relating
to cost and the provision of support for families who may be impacted by poverty. Plans cover
areas such as support with uniform; providing the resources required for school; support with
meals, snacks and drinks; trips and transport; providing digital access; ensuring that extra-
curricular activity and clubs are accessible to all; health and wellbeing; and ensuring that no
one misses out on fundraising events and themed days. 
• Schools have been making and facilitating referrals for families to The Big Hoose which
provides vital household goods, free of charge, to help ease some of the impact of poverty. 
Page 175 of 396

Page 176

50   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
• There has been active promotion of Free School Meals, School Clothing Grants and Education
Maintenance Allowance to the entire school community, encouraging uptake by eligible
families.  In 2024/25, 1469 pupils (P6 and above) were registered for free school meals. This is
an increase of 144 (10.9%) on 2023/24. By the end of 2024/25, 2242 pupils received a clothing
grant (around 12.6% of the roll). This represents a small decrease of 77 (-3.3%) on 2023/24.
• After-school provision and tax-free childcare have been actively promoted on social media
channels reaching 6652 families. 
Page 176 of 396

Page 177

Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 |   51 
Childcare 
Parents asked for
• Increased access to
accessible and affordable
childcare.
• Flexible childcare options
to support parental
employment. 
• Accessible information on
available childcare
options, places, and
costs. 
• Information on the benefits of tax-free childcare is being posted once per month. It also goes on
PKC wage slips once per quarter, ELC Newsletter, ERIC news & PKC website news once per
quarter. All families registered with Kids Clubs/Wraparound Care who do not use Tax Free
Childcare are emailed termly to advise of the benefit. 
• 1895 (8% increase on previous year) parents are supported to apply for and access their Tax-
Free Childcare Account which links to other benefits (Tax Credit for Childcare, Universal Credit,
Childcare Vouchers and Best Start Grants) resulting in wider access to affordable childcare. 
• 94 registered childminders in P&K (11 Funded Provider Childminders who can provide
1140hours per annum)
• 49 Perth and Kinross nurseries providing and 33 funded provider nurseries providing childcare
to 
3524, 2–5-year-olds accessing funded ELC in Perth & Kinross (April 2025)
• 4 Private/Voluntary Out of School Care Clubs
• There are 1729 children registered to use 16 Kids Clubs/Wraparound Care which enables
parents and carers to work or take up training opportunities. 
• 70 children benefitted from a free place at Kids Clubs’ holiday services during 2024/25 with
£82,500 being provided by PKC for through Fuelled for Fun. 
Page 177 of 396

Page 178

52   |    Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 
Transport
Parents asked for
• Improved transport links
in rural areas to support
parental employment
patterns. 
• Affordable local transport
options. 
• PKC replaced the commercially withdrawn local bus service in the Highland Perthshire area
and now fund these.
• PKC replaced the commercially withdrawn Almondbank to Perth local bus service by providing
funding for this.
• Glenfarg Community Transport Group commenced operating a demand responsive local bus
service in West Kinross-shire between Kinross and Tillicoultry which is fully funded by PKC.
• Kirkmichael Community Transport Group and Muthill Community Transport Group commenced
delivery transport for local residents with the MPVs provided by PKC.
• Service 16 between Perth and Dundee was improved by Stagecoach East Scotland in early
2025, further to feedback from the public, elected members and PTU Council officers. In
addition, PKC funded an additional early morning journey that is not commercially provided.
• Council agreed to support Glenfarg Community Transport Group to increase their owned fleet
in order to strengthen the group’s sustainability and future operations.
• Council increased local bus budget for FY 25/26 to take account of RPI and ongoing increasing
operational challenges, which ensured that no subsidised local bus services in operation in
24/25 would be subject to termination in 25/26 due to lack of financial resources in the local bus
revenue budget.
• In March 2025, PTU installed a new bus shelter and an electricity feed for information screen at
the Bridge of Earn bus stop served by the low-cost intercity electric coach service, Ember, in
order to improve access for rural passengers wishing to travel north or south to work
locations.  It is intended that the Real Time Information Screen will be installed at the bus stop
in FY 25/26.
• As at 31/03/25 78% of PKC Under 22 population had registered for a free U22s bus pass.
• Free bus travel is funded by PKC on the first Saturday of each month across the whole of Perth
and Kinross Council Area
Page 178 of 396

Page 179

Local Child Poverty Action Report 2024/25 and Local Child Poverty Action Plan 2025/26 |   53 
• Council committed to disposing of Council minibuses to Community Groups, free of charge,
rather than selling them at auction when they reach the end of their Council life.
• Improved layout works completed at Broxden Park and Ride site to accommodate the
increasing journeys operated by the low-cost intercity coach providers, Ember and Flix. 
Page 179 of 396

Page 180

Page 180 of 396

Page 181

Perth and Kinross
Integration Joint Board 
Annual
Performance
Report 
2024-2025
Ambition Compassion Integrity
7
Page 181 of 396

Page 182

2 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Contents
Preface.................................................................................................................... 4
Introduction ............................................................................................................ 5
Our Vision ........................................................................................................... 5
Our Ambitions ..................................................................................................... 5
Our Strategic Priorities ........................................................................................ 5
Strategic Plan .......................................................................................................... 6
Looking Forward .................................................................................................. 7
Performance ............................................................................................................ 7
Demographics ...................................................................................................... 7
Performance Framework ....................................................................................... 9
Planning ........................................................................................................... 9
Doing ............................................................................................................... 9
Checking .......................................................................................................... 9
Acting ............................................................................................................. 10
Latest Performance ............................................................................................ 10
Feedback from people that use services .............................................................. 13
Health and Care Experience............................................................................. 13
Care Opinion .................................................................................................. 13
Care Group Activities and Achievements ................................................................. 15
Community Mental Health and Wellbeing ............................................................ 15
Access ........................................................................................................... 15
Prevention ...................................................................................................... 15
Person-Centred Care ....................................................................................... 16
Workforce ....................................................................................................... 18
Engagement ................................................................................................... 18
Primary Care ...................................................................................................... 20
Outcomes for People ....................................................................................... 20
Outcomes for Workforce ................................................................................. 21
Outcomes for the System ................................................................................ 21
Learning Disability and Autism ............................................................................ 25
Older People’s Services ...................................................................................... 31
Early intervention ............................................................................................ 31
Page 182 of 396

Page 183

3 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Shifting the balance of care .............................................................................. 34
Optimising Capacity and Flow .......................................................................... 34
Carers ............................................................................................................... 37
Substance Use ................................................................................................... 43
Adult Support and Protection .............................................................................. 45
Lead Partner Services ............................................................................................. 46
Public Dental ..................................................................................................... 46
Podiatry ............................................................................................................. 49
Prison Healthcare ............................................................................................... 52
Workforce ............................................................................................................. 54
Progress Across the Five Pillars ............................................................................ 55
Learning and Development ................................................................................. 55
Progress against the Strategic Plan ...................................................................... 56
Independent Inspection ......................................................................................... 58
Mental Welfare Commission for Scotland ............................................................ 59
Care Inspectorate Inspections ............................................................................. 60
Arrangements for Clinical and Care Governance ................................................... 61
Finance ................................................................................................................. 61
Financial Resources Available to the IJB 2024-2025 .............................................. 61
Financial Performance ........................................................................................ 62
Financial Plan ..................................................................................................... 63
Best Value .......................................................................................................... 63
Governance and Accountability ........................................................................... 64
Use of Resources ............................................................................................... 64
Key Contact ........................................................................................................... 64
Appendix ............................................................................................................... 65
Appendix 1.1: Perth and Kinross HSCP Service Breakdown .................................... 65
Appendix 2.1: National Core Suite Indicator 1 to 9, 5 year comparison .................... 66
Appendix 3.1: Strategic Priorities Mapped to National Indicators and the National
Health and Wellbeing Outcomes ......................................................................... 68
To give us feedback ................................................................................................ 69 
Page 183 of 396

Page 184

4 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Preface 
Jacquie Pepper, Chief Officer (Health and Social Care)
Welcome to this year’s Annual Performance Report. In it you will read about our
performance, including ways in which we have continued to develop and integrate
health and social care services in Perth and Kinross during 2024-25. The
achievements described have been made possible by the hard work and
commitment of our staff who have adapted, innovated, and responded to the
numerous and varied challenges that have come their way. You will also see
examples of how we have worked with third and independent sector colleagues and
local community groups to support the health and wellbeing of Perth and Kinross
residents, developing new and innovative ways of responding to individual needs.
We continue to focus on developing services based on what is important to, and
needed by individuals, reflecting their goals and priorities, and supporting them to be
as active and independent as possible. We have included a number of case studies
that help to illustrate how our services meet people’s very specific needs and wishes.
This report covers a year in which the Integration Joint Board (IJB) was presented
with a very challenging financial context reflected by IJBs across the country. Against
this backdrop our performance and delivery of positive outcomes for our residents
have improved overall.  
IJB members worked with HSCP Officers to develop a financial recovery plan from
September 2024. This was successful, along with a series of savings proposals
agreed in March 2024, in reducing projected overspends. Our data shows that our
population continues to increase alongside growing levels of need and complexity
and this is set to continue as our population ages at a rate higher than Scotland and
most of our comparators. The IJB faces ongoing financial uncertainty and is
committed to early and ongoing financial planning to ensure that budget decisions
are well informed and support the most effective and efficient use of resources.
Engagement with individuals, communities, staff, partner organisations, and other
stakeholders has underpinned much of our activity during 2024-2025, and positively,
both NHS Tayside and Perth and Kinross Council have increased the level of funding
to the IJB in 2025-2026. 
Page 184 of 396

Page 185

5 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Introduction
Perth and Kinross Health and Social Care Partnership (HSCP) provides and
commissions local health and social care services to meet the needs of the Perth and
Kinross population, and to deliver the strategic objectives of the Integration Joint Board
(IJB). Our aim is to improve health and wellbeing outcomes, by providing the right care
and support in the right way and at the right time for the population through services
delegated by NHS Tayside and Perth and Kinross Council. The IJB Strategic Plan 2024-
2027 sets out a shared vision, ambition and strategic priorities. 
Perth and Kinross is divided into three localities, North Perthshire, South Perthshire and
Perth City, each with distinct population needs and service delivery models. Services
are delivered through integrated, multi-disciplinary teams embedded in each locality,
enabling rapid, person-centred support. This locality approach ensures services are
responsive to local demographics, geography, and health and social care needs.
Our Vision
For every person in Perth and Kinross to live in the place they call home with the
people and things they love, in good health and with the care and support they
need, in communities that look out for one another, doing the things that matter most
to them.
Our Ambitions
• For people to stay as well as possible for as long as possible.
• For people to live as independently as possible for as long and as safely as
possible.
• For people to be able to thrive and feel valued members of the community.
Our Strategic Priorities
1. Target resources to where people and communities need help most.
2. Make it easier for people to understand where and how to access services.
3. Provide health and social care supports close to home.
4. Work with communities to design the health and social care supports they
need.
5. Improve integrated working.
6. Promote self-management and living well.
7. Value our workforce, support them to keep well, learn and develop.
We use the National Framework for Community and Social Care Integrated Services to
inform the development of local change and transformation plans, drawing on what is
known to work in other areas. Priorities are progressed through the implementation of
Page 185 of 396

Page 186

6 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
wider strategies and delivery plans with a broad range of outcomes sought via specific
care groups as follows:
• Mental Health and Wellbeing
• Primary Care
• Learning Disabilities and Autism
• Older People’s Services
• Carers
• Substance Use 
These plans provide more detail on how we deliver our services and they are
underpinned by outcomes focused performance management frameworks which are
strongly linked to the National Health and Wellbeing Outcomes: 
People are able to look after and improve their own health and wellbeing
and live in good health for longer. 
People, including those with disabilities or long term conditions, or who
are frail, are able to live, as far as reasonably practicable, independently
and at home or in a homely setting in their community. 
People who use health and social care services have positive
experiences of those services, and have their dignity respected. 
Health and social care services are centred on helping to maintain or
improve the quality of life of people who use those services. 
Health and social care services contribute to reducing health inequalities. 
People who provide unpaid care are supported to look after their own
health and wellbeing, including to reduce any negative impact of their
caring role on their own health and wellbeing. 
People who use health and social care services are safe from harm. 
People who work in health and social care services feel engaged with
the work they do and are supported to continuously improve the
information, support, care and treatment they provide. 
Resources are used effectively and efficiently in the provision of health
and social care services.
Strategic Plan
Each Integration Authority must produce a strategic plan over the medium term, using
the integrated budgets under their control. Stakeholders must be fully engaged in the
preparation and review of the plan. This ensures a meaningful co-productive approach
is taken to deliver the national outcomes for health and wellbeing and achieve the core
aims of integration: 
• To improve the quality and consistency of services for patients, carers,
service users and their families. 
• To provide seamless, integrated, quality health and social care services in
Page 186 of 396

Page 187

7 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
order to care for people in their homes, or a homely setting, where it is safe to
do so. 
• To ensure resources are used effectively and efficiently to deliver services
that meet the needs of the increasing number of people with long term
conditions and often complex needs, many of whom are older. 
An Integration Authority is required to review its strategic plan at least every three years
and may carry out additional reviews. In carrying out a review, Integration Authorities
must consider: 
• The national health and wellbeing outcomes.
• The indicators associated with the national outcomes. 
• The integration delivery principles.
• The views of the Strategic Planning Group.
Looking Forward
To continue the implementation of the strategic plan, new delivery plans for Older
Peoples’ Services, Adult Services, and Primary Care are being developed. These will
replace the existing care group strategic delivery plans which come to an end within the
financial year 2025-2026. The structure of how these plans come together is set out
within the IJB Performance Framework. 
Performance 
Demographics
Perth and Kinross is a geographically large Local Authority area with a total population
of circa 152,560 (National Records of Scotland) split evenly across the three HSCP
(Health and Social Care Partnership) localities North Perthshire, South Perthshire, and
Perth City.
Chart 1 
Page 187 of 396

Page 188

8 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
The population of Perth and Kinross is older compared to the overall population of
Scotland. The number of people aged 85 and over is projected to increase substantially,
which will significantly increase the demand for health and social care services. Chart 2
illustrates how the age profile of the population is expected to change between 2018 to
2028, with a large increase in the older population, without a similar increase in the
working age population. At the year end of 2024-2025, Perth and Kinross was seven
years into this population shift and the associated increase in need and demand is
driving higher costs and budget pressures.
Chart 2 
Source: National Records of Scotland -Perth and Kinross Council our Profile
This changing population profile combined with rurality, presents substantial challenges
in the delivery of services at the scale required to meet the needs of the community.
The Scottish Index of Multiple Deprivation indicates that 23.2% of our population live in
the least deprived quintile and 6% in the most deprived. Perth and Kinross is classified
as “Mainly Rural” (Scottish Government - Rural and Environmental Science and
Analytical Services) and is the eighth most rural Local Authority area in Scotland. This
means that service accessibility is a significant contributor to inequalities and reduces
the potential for economies of scale. Life expectancy is above the Scottish average,
78.8 years for males and 82.6 years for females compared to 76.8 years and 80.8 years
respectively. The number of people supported in the treatment of Long-Term Conditions
(LTCs) provides some additional context on the health of our population and the
consequential need for Health and Social Care support. It is estimated (based on
people who have contact with NHS services) that 21.6% of the population have at least
one LTC. These include cardiovascular, neurodegenerative and respiratory conditions,
as well as other organ conditions namely liver disease and renal failure, arthritis,
cancer, diabetes and epilepsy. Chart 3 shows how the population is affected by LTCs
overall and with the prevalence of LTCs increasing with age, this demonstrates how the
impact of the population shift results in significant additional demand across Health and
Social Care services. 
Page 188 of 396

Page 189

9 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Chart 3 
Performance Framework
The Performance Framework (approved June 2025) outlines a structured, cyclical
approach to planning, delivering, monitoring, and improving health and social care
services. It is built around the Plan-Do-Check-Act (PDCA) model and aims to ensure
alignment between strategic goals and operational delivery, with a strong emphasis on
continuous improvement and accountability. 
Planning - Conducted at three levels - Strategic, Delivery, and Operational. Each level
aligns with the IJB Strategic Plan (2024–2027),which sets seven key priorities:
1. Target resources to where they are needed most.
2. Improve access and understanding of services.
3. Deliver care close to home.
4. Co-design services with communities.
5. Enhance integrated working.
6. Promote self-management and wellbeing.
7. Value and support the workforce.
Doing - Implementation of services based on operational plans that detail required
resources, delivery methods, and performance metrics. This phase emphasizes quality
improvement and responsiveness to local needs.
Checking - Performance is monitored using a layered approach:
• Strategic Level: Annual and quarterly reports using national and local
indicators.
• Delivery Level: Outcome-focused frameworks for care groups.
• Operational Level: Real-time metrics on demand, capacity, and service
quality.
SMART objectives and both qualitative and quantitative data are used to ensure
relevance and impact. 
Page 189 of 396

Page 190

10 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Acting - Informed decision-making based on performance data leads to service
redesign, investment/disinvestment, and transformation. Emphasis is placed on data
quality, governance and clear accountability at all levels.
Governance and Reporting - Performance data is reviewed by multiple internal and
external bodies, including the IJB, NHS Tayside, Perth and Kinross Council, and various
management teams. Reporting is tiered to match the strategic, delivery, and operational
levels, ensuring appropriate oversight and action.
Technology and Tools - It is planned that the framework will leverage tools like Microsoft
Power BI and the PK Performs system to integrate data across services, enabling a
whole-system view and enhancing decision-making capabilities.
Benchmarking and Improvement - Benchmarking against peer groups and national
standards supports learning and improvement. Targets are set across short, medium,
and long-term horizons, considering resource availability, demand and risk.
Latest Performance
Strategic performance is measured against the Core Suite of Integration Indicators
(National Indicators) combined with those of Ministerial Steering Group (MSG).
The table below summarises performance against these indicators, with comparisons
to last year and to Scotland overall. 
Page 190 of 396

Page 191

11 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Table 1
Ref Indicator Description
Perth
and
Kinross 
2023-
2024
Perth
and
Kinross 
2024-
2025
How we
compare
to last
year
Scotland 
2024-
2025
How we
compare
to
Scotland
NI 12 Emergency admissions rate for adults (18+) (per 100,000 population) 14,049 14,394 2.5% 11,559 24.5%
NI 13 Emergency bed day rate for adults (18+) (per 100,000 population) 119,654 110,545 -7.6% 113,627 -2.7%
NI 14 Emergency readmissions to hospital within 28 days of discharge 
(rate per 1,000 discharges 18+) 153 153 0.0% n/a n/a
NI 15 Proportion of last 6 months of life spent at home or in a community setting 89% 90% 0.8% 89% -0.6%
NI 16 Falls rate per 1000 population aged 65+ (falls which result in a hospital
admission) 26 25 -1.6% 23 12.4%
NI 17 Proportion of care services graded "good" or better in Care Inspectorate
inspections 71% 71% 0.4% 82% -10.7%
NI 18 Percentage of adults with intensive care needs receiving care at home 64% 64% 0.2% 65% 0.8%
NI 19 Number of days people aged 75+ spend in hospital when they are ready to 
be discharged per 1,000 population 645 654 1.4% 952 -31.3%
MSG1a Emergency admissions per 100,000 population (all ages in acute hospital) 12,630 12,725 0.8% 10,822 17.6%
MSG2a Number of unscheduled hospital bed days; acute specialties per 100,000
population 77,178 71,254 -7.7% 75,138 -5.2%
MSG3a Accident and Emergency attendances 18+ per 100,000 population 18,615 19,629 5.4% 26,028 -24.6%
MSG4 Delayed discharge bed days 18+ per 100,000 population 13,982 13,338 -4.6% 15,969 -16.5%
Notes:
1. Data for NIs is published via Public Health Scotland.
2. NIs 1 to 9 are reportable every two years only. Please see Appendix 2 for the latest data.
3. NIs 17 and 19 data covers 2024-2025, all others are for calendar year 2024 due to incomplete data for January to March 2025.
4. NI 14 - It is not possible to accurately compare performance to elsewhere due to differences in data recording practices.
5. MSG data is provided for management information only, is unpublished and is subject to change.
Exceeding our comparator or within 3% Between 3% and 6% from comparator More than 6% from comparator
Page 191 of 396

Page 192

12 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
The rate of emergency admissions (NI 12) has increased by a small amount
(performance has declined by 2.5% for the 18+ population and 0.8% when considering
all ages (MSG1a)). Performance remains within the current target range which is good
when considering the older and more frail population of Perth and Kinross and the
related impact on the need for emergency care.
When people have been admitted to hospital in an emergency their stay is likely to be
shorter compared to 2023-2024 as the rate of emergency bed days (NI 13) has reduced
(improved) by 7.6% (for 18+ population and 7.7% for all ages (MSG2a)) which
demonstrates the commitment made to discharge people as early as it is safe to do so
when their care can be continued in their home or homely setting. 
The risk of falls increases with age and given the growing older population in Perth and
Kinross, higher admission rates due to falls (NI 16) are to be expected. This is reflected
in the rate of 25 admissions per 1,000 people aged 65 and over in Perth and Kinross,
compared to 23 per 1,000 for Scotland. Despite this, performance against this indicator
remains good, with a marginal improvement of 1.6% compared to last year.
The number of readmissions within 28 days of discharge per 1,000 discharges (NI 14)
has remained stable at 153, which has paused a previous upward trend against this
measure.
In the last six months of life (NI 15) people in Perth and Kinross spend 90% of their time
at home (rather than within inpatient settings). This is similar to the 89% achieved last
year and is good evidence of people being supported to remain at home in accordance
with their wishes. 
Supporting people to remain at home as they age or as their care needs increase can
be increasingly challenging. However, with 64% of people with intensive care needs
receiving ‘care at home’ (NI 18), performance remains positive, consistent with last year
and on a par with Scotland.
The rate of Accident and Emergency attendances (MSG 3a) has risen by 5.4%
compared to last year, indicating a decline in performance. However, it remains 25%
better than Scotland overall. The underlying causes of this increase are complex and
not yet fully understood. Ongoing efforts to further integrate health and social care
services in communities are redesigning how people access services, particularly
through the introduction of a Single Point of Contact. As this work progresses,
attendance rates will be closely monitored.
Performance in managing delayed discharges remains good. For individuals aged 75
and over, Perth and Kinross performs 31% better than Scotland overall (NI 19).
Additionally, there has been a 4.6% improvement in delayed discharge performance for
the 18+ population compared to last year (MSG 4). To provide additional context, 97%
of patients in Perth and Kinross are discharged from hospital without delay (94% for
those aged 75+).
Page 192 of 396

Page 193

13 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Feedback from people that use services
Health and Care Experience
The Health and Care Experience survey covers National Indicators 1 to 9 and is
published every two years (last publication was in 2024). Respondents for the survey
are selected at random from GP practice lists with survey questions covering a broad
range of topics including their experience of health and social care services. Please 
see 2023-2024 Annual Performance Report where more detail is provided on these
indicators combined with data gathered through local service user surveys which show
high levels of satisfaction. In support of the new strategic plan, and the performance
framework, new approaches to gathering service user feedback are now being
developed and will be used for future performance reporting.
Care Opinion
To broaden understanding of people’s experience, Care Opinion gathers real stories of
the experiences and outcomes of using our services. All HSCP teams are using Care
Opinion and in 2024-2025, 375 stories were shared, building on the 315 stories from
the previous year. Some of these stories are provided within this annual performance
report and all of these stories can be read on the Care Opinion website. 
As a result of feedback, improvements are being taken forward which will:
• Improve access to nail surgery,
• Fill appointment cancellations at short notice, and
• Use technology better to improve continuity of care.
As people provide feedback, they often mention how they felt about their experience
and this word cloud gives a summary of the descriptive words used. 
People mentioned that they were ‘thankful’ in 12.5% of stories, ‘grateful’ in 12.3%,
‘supported’ in 11.2%, ‘put at ease’ in 9.3% and ‘happy’ in 8.5%. When considering what
100% of stories responded                                 
to with a mean response                            
time of 68 hours. 
97% of responses 
were rated as helpful. 
Page 193 of 396

Page 194

14 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
was good, ‘staff’ were mentioned 37.1% of the time, ‘professional’ was mentioned
26.1% of the time and ‘friendly’ 17.6%. Care Opinion helps staff and managers reflect
on what they can do to make all aspects of care and treatment better. For what could be
improved, there is a broad range of things, with two or three comments for each, which
individuals mentioned that could have improved their experience, ranging from car
parking to joined up care to waiting lists. Due to the breadth of comments, it is not
possible to draw meaningful themed conclusions. However, 100% of stories are
reviewed by staff and where possible, staff make the improvements people mention and
these are taken forward on an individual basis. The chart below shows the overall rating
for a variety of measures about people’s experiences which, when aggregated,
achieved at least 4.73 out of 5 over the year. All the measures showed an improvement
from last year. 
The majority of stories (89%) were submitted via the website, 5% via leaflet and 6% by
phone and they have been viewed over 28,900 times (as at 17 April 2025). 
43% of people identified themselves as the patient, 36% as a service user and 10% as
a relative.
Page 194 of 396

Page 195

15 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025 
Care Group Activities and Achievements
Community Mental Health and Wellbeing
The Community Mental Health and Wellbeing Strategy has progressed five strategic
themes, access, prevention, person-centred care, workforce and engagement. 
Access
Mental health services are currently supporting around 5,000 individuals, with efforts
focused on reducing wait times and improving access to care. The Primary Care Mental
Health Transformation Programme, launched in March 2024, enhances early
intervention through dedicated nursing support via General Practices, offering up to 240
appointments weekly. As well as providing early support and self-management the
service enables referral into third sector services which can help to address the wider
issues people encounter, not all of which will be mental health related.
The inaugural Mental Health and Wellbeing Conference attracted over 230 attendees,
fostering collaboration and shared learning. Clinical advancements include the
continued excellence in Electroconvulsive Therapy (ECT) delivery, and the
establishment of a Mental Health Clinical Care Governance Forum to strengthen
oversight and accountability for HSCP provided services.
Operational improvements include a dramatic reduction in Occupational Therapy wait
times and the appointment of a Neurodevelopmental Disorder Nurse Co-ordinator to
address rising ADHD referrals. The new Mental Health Clinical Pharmacy model
supports medication management and pathway modernisation.
Prevention
The Suicide Prevention Strategy Group has worked closely with all sectors to prioritise
prevention and early intervention of mental ill-health and suicide. Close working with
Andy’s Man Club and Man Talk provides a targeted Men’s Suicide Prevention
campaign. Support for adults and young people on suicide is provided through Suicide
Awareness and Prevention Co-ordinators, and training is being developed to support
Page 195 of 396

Page 196

16 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
families bereaved through suicide. Community-based initiatives like MoveAhead
continue to grow, providing inclusive support through group and individual interventions,
while the Health Hub at Murray Royal Hospital offers physical health advice and
signposting, staffed by volunteers with lived experience. 
PKAVS delivers mental health and wellbeing support to the local community, from the
grounds of The Walled Garden, Perth and Wisecraft in Blairgowrie. Through the
facilitation of meaningful and therapeutic activities (creative arts, woodwork,
horticulture, hospitality/catering and physical, nutritional and resilience focused activity)
they aim for people to have better physical, emotional and mental wellbeing. 
Person-Centred Care
People are supported to have the knowledge and confidence to take control and make
decisions about their lives. Roles and services that act as community connectors, such
as Social Prescribers and Community Engagement Teams, are fully embedded in
communities and services.
Specialist services work closely with community services and the third sector to support
people to achieve personal outcomes through low level, early interventions. Some
clinical interventions are offered successfully through online support and telephone
triage. Community Teams and Hospital Teams liaise to ensure the needs of people are
being met, and help to facilitate discharge from hospital safely, as early as is possible.
There has been a reduction in people experiencing delay in their discharge for adult
general psychiatric inpatient services down to zero in most weeks.
Partnership working with the third and independent sector is key to delivering against
population demands. For example, people with mental health presentations are
supported to access the most appropriate service for their needs, depending on the
severity of their condition. The Neuk Crisis Centre  delivers support to people in crisis in
Perth and Kinross, and the MoveAhead service continues to deliver early intervention
and community-based services within areas of Perth with higher levels of health
inequalities, e.g. Letham.
83 new referrals                                         
Jan to Dec 2024
“I have developed my
communication skills.” 
“I have grown
in confidence.” 
“I am happy I have the
opportunity to try new things.” 
“I have developed my gardening
skills and learnt how to manage my
stress.” 
“I have built positive friendships in
my creative sessions and
developed relationships with staff.” 
“Staff have been very flexible meaning I have been able to attend both The
Walled Garden and College.” 
Page 196 of 396

Page 197

17 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Digital mental health and wellbeing supports continue with investment in the ‘Brain in
Hand’ app. As people engage with services, Silver Cloud (previously known as Beating
the Blues) is promoted as a way for them to support their own mental health
independently. 862 people have used Silver Cloud in the last 12 months and online CBT
(cognitive behavioural therapy) is also provided by psychological services. 
Perth and Kinross is participating in a pilot with Health Improvement Scotland to assess
the feasibility of national Adult Mental Health Core Standards. Staff are also actively
engaged in the Pan-Tayside Mental Health and Learning Disability Whole System
Change Programme and engaged in co-producing a new model of care for adult mental
health at all levels.
Third sector partnerships remain vital, with continued investment through the
Community Mental Health and Wellbeing Fund and Perth and Kinross Council Budget
Motion allocations. Distress Brief Interventions, now delivered by The Neuk, are
increasing, with 250 referrals last year. 
Mindspace delivered 974 counselling sessions, and the Recovery College delivered
266 sessions and 63 courses. A participant on Creativity for Wellbeing said: 
We have a multi-professional approach to caring and supporting adults with multiple
and complex needs and those at risk of harm. All staff are trained in ASP (Adult Support
and Protection) legislation and the obligations to ensure faster identification, targeted,
and well-co-ordinated responses.
Perth Six Circle help disadvantaged adults improve social connections. Activities
include weekly social activity clubs, interactive workshops including IT connections,
formal or external social interaction opportunities, visits to places of interest, buddy
support, joint events for local organisations and attendance at national events. 
862 people used                                  
Silver Cloud in the                                  
last 12 months. 
“It helped me relax and be more me. It is wonderful to be able to express yourself
through art.” 
“I feel part of a family. It gives me a purpose to get out of bed and engage with
others and see places I’ve never been before, seen loads of Scotland I would
never see so I feel really better connected to the community. I would not do things
on my own. Perth Six Circle has helped me through this last year, particularly with
the loss of both parents.” 
Page 197 of 396

Page 198

18 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025 
Workforce
Workforce developments show progress in nursing recruitment, though challenges
persist in securing medical and allied health professionals. Work is progressing to
integrate our specialist services like the Integrated Drug and Alcohol Recovery Team 
(iDART), multi-professional Learning Disabilities Team (SCOPE) and Primary Care
Mental Health. This is part of a progression towards wider integration of services across
the HSCP, with options around co-location explored.
All HSCP mental health teams use Care Opinion to gather feedback and learn from
what is working for people and what is not. Currently uptake is low, and the following is
some of the work that is ongoing to address this. Depending on patient need, Care
Opinion leaflets are provided which can be used to provide written feedback and then
posted free of charge. This is a good option for some people as they can struggle to
offer feedback via technology. The team also hosts Alzheimer Scotland PDS Link
Workers and they collate feedback using the Single Quality Question, managed by
Alzheimer Scotland. Another team provides a feedback box in their waiting area and a
simple form asking three questions - Who are you open to, what are we doing well and
what can we improve? - staff print the feedback in themes and display it in the waiting
area to let the client group know that the feedback is used and valued. This has also
improved staff morale and the culture around feedback. The feedback box has been
massively successful and has provided some really rich and mostly positive feedback
and has hopefully empowered people to feel involved in how we plan our service.
We encourage development of staff through support, supervision and training and
development opportunities to generate real improvement. Staff are supported to
understand the importance of the communities we service by continuing to develop
integrated working and locality-based services. 
Engagement
Consultation and engagement is underway in relation to the development of  the ‘Model
of Care’ approach for mental health services. This programme is benefiting from the
inclusion of people with lived experience in a co-production approach. A revised
strategy for 2025 is in development, with a focus on integration, quality improvement,
and whole system working. This strategy aligns with the Tayside-wide Mental Health
and Learning Disability Whole System Change Programme and will ensure health
“I feel less isolated, it gets me out of the house, and I enjoy the company of other
service users. PSC have helped me to do different activities that I would not have
done on my own. I’ve joined weekly aquarobics class with another service user. I
look forward to attending the Six Circle and really enjoy myself.”
For each month of 2024- 
2025, over 94% of staff 
‘LearnPro’ training complete. 
Page 198 of 396

Page 199

19 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
inequalities continue to be prioritised along with comprehensive equality, human rights
and a person-centred approach. 
Care Opinion Story - I met with [staff] from Move Ahead during my
rehabilitation of an injury that had left me immobilised and isolated for several
months. I had lost confidence in being out and in busy environments and was
also anxious about the rehabilitation as it had gone through several setbacks.
[Staff] was easy to talk to. She had a great knowledge of different groups that
are taking place around Perth and also took into account that I wouldn't be able
to walk very far to get to them. It was such a was a relief to feel heard and
supported in this way after all those months. [Staff] helped me to connect with a
group and to create a staged strategy for increasing my exposure to busy
environments while also thinking about the ongoing physical rehabilitation. I'm
really grateful that this service is available. If there is anything that could have
been better - it would be that the impact of anxiety and depression on recovery
could have been made more clear in the first place and the referral could have
been made sooner. This experience has taught me a lot about the danger of
separating physical and mental health from each other. 
Case Study – The client made a self-referral to MoveAhead following a
conversation with the Primary care mental health and wellbeing nurse. The
client is a double amputee, she had been coping well until recently when she
realised that this was her “life now” and she took a dip in her mental health,
feeling depressed, not going out, and only speaking with her husband and
two dogs. And the occasional telephone communications with family. She
made a self-referral to MoveAhead having moved to Perth from Kinross, due
to requiring a house that had the adaptations for her requirements. Initially
she felt that she was lacking motivation and looking for building structure and
routine to her day. Following our discussions about different support that was
available, the client made a self-referral to Mindspace counselling service
and has recently started with this finding it beneficial. She identified that she
would like to attend a craft group to help build social connections and reduce
isolation. She has been attending the CATH connect, “knit and natter” group
on Wednesdays and “on the mend” group on Fridays, which she enjoys and
has made friendships. She has built a good relationship with the staff at
CATH, often helping at events, has been supported into volunteering
opportunities, and has now started as a “Purple Lady” in her volunteer role at
Tay Ward. She recently got the opportunity to start using her “legal head
again” for letting her house. It was a pleasure working with her and watching
her grow in confidence and be able to use her personal experience to help
others. 
Page 199 of 396

Page 200

20 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Primary Care
Through the Primary Care Strategic Delivery Plan (update report) strong progress is
being made against the delivery of outcomes for ‘people’, ‘workforce’, and ‘the system’. 
Key successes include the full embedding of First Contact Physiotherapy (FCP) into
core services, the expansion of access to Primary Care Mental Health and Wellbeing
Nursing, now accessible to all 23 practices, and the continued development of
Community Treatment and Care Services (CTAC). These services are now integral to
the delivery of modern, community-based care. 
Outcomes for People
The FCP service is available across Perth and Kinross and has delivered 12,398
appointments for people in 2024. This is a utilisation rate of over 90% with DNA rate
(patient Did Not Attend) of 7.1%. The chart below shows the spread of utilisation across
Perth and Kinross. A high percentage of people (almost 70%) are discharged after their
initial appointment demonstrating the value of the service to people and ‘the system’
overall. 
The Community Treatment and Care (CTAC) service workforce are trained in public
protection and work in partnership with GP practices and wider multi-disciplinary teams
to safeguard those at risk and to assist with more co-ordinated responses to
safeguarding concerns.
Advanced Nurse Practitioners focus on urgent care home visiting with a focus on older
people, some of whom have the most complex needs. They work within a multi-
disciplinary team to ensure people are seen by the right professional for their condition,
for example; a Podiatrist, an Occupational Therapist or Physiotherapist.
People experiencing a mental health crisis often reach out to their GP. Working in
partnership with The Neuk crisis centre, GPs are able to refer people who can benefit
from non-stigmatising and holistic support.
An example of using technology to support people with their conditions are ‘Near Me’
which provides appointments remotely via video link, reducing the need for travel for
physical face to face appointments. ‘Medlink’ is another example. This system is used
by 70% of GP practices to help people manage their chronic health conditions. A Digital
Development Group has been established to continue the implementation of these and
other technologies.
Page 200 of 396

Page 201

21 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025 
We work with communities to develop bespoke care and support, such as the Primary
Care Team using a voluntary blood bank service in rural areas, enabling an increase in
phlebotomy appointments.
Outcomes for Workforce
Workforce recruitment, particularly in pharmacy, continues to be a national issue,
exacerbated by a mismatch between demand and the levels of people training to
become the future workforce.
Alterations to how the CTAC service is managed have been successful with Staff Side
colleagues applauding the inclusive approach that was taken to support staff. The new
arrangements will allow a greater level of consistency of delivery and better utilisation of
appointments across the three localities.
General Practice ‘Learning Time’ is now embedded in annual plans (training afternoons
for all general practice staff), iMatter surveys are completed annually and staff health,
safety and wellbeing is a standing item on the Primary Care governance group. Primary
Care staff complete annual personal development plans and access TURAS to ensure
core training needs are met, and access LearnPro for additional learning. The Primary
Care Team achieved the Health and Safety Silver Accreditation Award. 
Outcomes for the System
All 23 GP practices participated in recent prescribing efficiency initiatives, which saw
patient’s medication switched to less expensive alternatives. These efforts demonstrate
a commitment to cost-effective prescribing and system-wide sustainability.
Accommodation constraints are limiting the expansion of multi-disciplinary teams and
the services that can be delivered, however, the Premises Group and Sustainability
Group are actively addressing these issues, including progressing the Primary Care
Premises Strategy 2023–2028. 
The Primary Care Team undertook public engagement in Bridge of Earn to inform a
needs assessment in June 2023, with a report published in 2024. The collaborative
Medlink used in                                 
70% of practices 
Primary Care Team achieved                       
Health and Safety Silver                       
Accreditation Award in                               
November 2024. 
Page 201 of 396

Page 202

22 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
engagement method was commended for its co-ordinated approach and for
strengthening relationships with the local Community Council. A public premises survey
was done in September/October 2023 with the report published in August 2024. 
Drop-in sessions led by third sector colleagues at PKAVS have opened up access to
Primary Care services for people seeking asylum. This work will continue throughout
2025-2026 with the Primary Care Conference in September 2025 bringing together
Churches Action for The Homeless (CATH), PKAVS, Mindspace and more.
Further community connections are now in place through the Letham Hub as a key
stakeholder supporting the HSCP commitment around early intervention, prevention. 
Primary care managed services were developed to support GP Practices, aiming to
reduce workload for GPs and improve sustainability. A Primary Care ‘Primary
Connections’ event is now scheduled for September 2025 which will bring general
practice and HSCP managed services together to network, build stronger relationships
and consider improvement ideas for the future.
When GP practices close, it impacts substantially on the people that use the service. To
mitigate this as much as possible, Equality and Fairness Impact Assessments (EFIAs)
are completed whenever a practice signals their intention to close. An example of the
mitigation offered was the commissioning of Perth Access Cars to facilitate support to
local residents needing transport to see their GP, following the closure of a branch
surgery. 
In conclusion, significant progress has been made with a clear focus on improving
access, supporting integrated care, and addressing health inequalities. While financial,
premises and workforce pressures remain, the strategic direction and collaborative
efforts across Perth and Kinross provide a strong foundation for continued
transformation in primary care.
Page 202 of 396

Page 203

23 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025 
Finding my voice: A journey from silence to safety (Care Opinion
Story)
It was February 2025 when I first visited my GP practice in Perth. I had just
spent nearly four months recovering from lower back surgery and was
struggling badly with anxiety and insomnia. I believed I just needed a repeat
prescription to get through the sleepless nights and the mental fog. But that
appointment turned out to be the first step toward uncovering something
much deeper - and darker - that I hadn’t fully acknowledged: I was
experiencing domestic abuse.
My GP referred me to MindSpace, a local mental health support service in
Perth. That’s where I met [name], the counsellor who changed everything.
She conducted my initial assessment and, despite there being a 3 to 4
month waiting list, kindly took me in right away. Her compassion and
understanding were immediate. She helped me recognise that the abuse I
was enduring wasn’t just in my head - it was real, and it wasn’t limited to just
physical violence. Until then, I had thought domestic abuse only meant
bruises and scars. She helped me see the emotional manipulation, coercive
control, sexual and digital abuse for what they truly were. She didn’t just
stop at helping me understand - she empowered me.
She gave me direct helplines, support contacts, and the encouragement to
seek help. That’s how I came across several organisations that became
lifelines: Abused Men in Scotland, MoveAhead, The Neuk (a mental health
and suicide prevention centre), and the Perth and Kinross Access Team for
Adult Social Care. Through the Access Team, I was connected to [name], a
social worker who didn’t just listen - she gave me hope. She immediately
sprang into action, reaching out to her colleagues to start preparing for a
safe house placement. She was proactive, reassuring, and determined to
help me find safety.
That’s when I was referred to MoveAhead, a community mental health and
wellbeing service. There, I met [name], a gem of a person who works for the
NHS. He was one of the few people who didn’t just understand my situation
- he believed me. He made me feel seen and safe in a world where male
victims of domestic abuse are often dismissed or overlooked. He literally
walked from one building at Perth Royal Infirmary to the bus station just to
pick me up for our first appointment. That gesture, small as it may seem,
meant everything - it told me I wasn’t alone anymore. He went above and
beyond his role. He treated me like a younger brother during a time when I
felt utterly alone and broken. He listened without judgment, reassured me
when I was full of doubt, and most importantly, he made me believe that
men can be victims too. He regularly took me out on walks or to church,
helping me open up in safe and calm environments. He even gave me his
work number in case I needed him urgently and was always connected over
email.
Page 203 of 396

Page 204

24 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025 
Continued - When I had to make a last-minute change to the escape plan,
he didn’t hesitate. He adapted immediately, rearranging everything to
accommodate the new day, ensuring my safety came first. He also
accompanied me to the council, helped me submit a homeless application,
and even booked an appointment with my GP on my behalf to make sure
my prescriptions were in order. These weren’t just professional duties - they
were acts of kindness, humanity, and solidarity that I’ll never forget. During
the process, I was also supported by [name] from the Ethnic Minorities Law
Centre. He patiently helped with all the paperwork related to the Migrant
Victims of Domestic Abuse Concession, using his legal expertise and calm
presence to make a very chaotic time feel manageable.
Thanks to all these incredible people, I’m writing this from the safety of my
council-provided accommodation. My mental health score is getting
significantly better, and I can finally breathe like a human being again. I'm no
longer living under the shadow of constant surveillance and psychological
torment. No more being questioned about where I’m going or who I’m
meeting. No more being forced to share passwords, hide my belongings, or
live on eggshells fearing the next outburst. No more being told which job I can
or cannot take. No more emotional blackmail, threats, or being forced into
intimacy. No more replying to constant check-ins or feeling guilty for seeing
friends or using social media. I can finally remove the privacy screen protector
from my phone, speak freely to my family, and not whisper in the garden to
have a private conversation. The coercive control, emotional abuse, sexual
intimidation, and digital surveillance had pushed me into hypertension,
anxiety, depression, insomnia, and suicidal thoughts. I was alive, but I didn’t
feel human.
But now - I do. I feel safe. I feel hopeful. And I feel grateful. Every single
person I encountered along the way - [names] and the incredible teams
behind the organisations that stood by me - helped rebuild the broken
pieces of my life. They enrolled me into workshops and seminars to help me
rebuild confidence and rediscover purpose. When everyone else in the
world made me feel like I had to constantly defend or explain myself, these
people just welcomed me with kindness. They treated me like a human
being - something I had almost forgotten how to feel.
Thank you, from the bottom of my heart, to everyone who walked with me
on this journey. And especially - thank you, [names]. I owe you both more
than words can ever express.
Page 204 of 396

Page 205

25 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025 
Learning Disability and Autism
The implementation of the Learning Disability and Autism Strategy 2022-2025 has
made significant progress in delivering person-centred support for people with autism
and/or a learning disability. 
The SCOPE Team is multi-disciplinary and provides specialist support for people with
autism and/or a learning disability who have complex needs. 
Care Opinion Story - I was under unbearable stress at work, was not
sleeping, anxious and depressed. I live alone and felt I had no one to openly
talk to. I felt like I was trapped, my problems and stresses building up with no
release and I have to be honest and say that I did think about ending my life. I
decided to go off sick from work and made an urgent appointment with the GP.
This was the best thing I could have done as I was able to be open and was
given the time to explain how I felt. I was signed off work and this helped
remove the guilt I was feeling about taking time off and, most importantly,
helped me to focus on my own wellbeing and deal with my problems. I was
given an antidepressant and also made an appointment to see the wellbeing
nurse. About a couple of weeks passed before I saw the nurse. In that time, I
had been taking my meds and trying to eat well, stay active and talk to my
family. I was starting to get anxious about going back to work and seeing [staff]
helped to reassure me that I still needed some time to get better and went
over where I could get support and also, importantly, helped me to plan how to
tackle re-engaging with work. I still have some time before my sick line runs
out and I will see the GP before that, so, will be able to make a decision about
whether I feel ready or not at that time. In the meantime, I will continue to try
and look after myself and follow the plan I made with [staff]. 
Care Opinion Story - I was referred to the mental health team by my GP after I
reached out and needed help. I was given an initial appointment very quickly and
re-directed to the most appropriate support within a week. I completed a 5-week
stress management course which was delivered 1:1 by [staff] at [my GP]
Surgery. I found the course extremely useful. [Staff] was very supportive and
explained everything I was feeling and experiencing in a clear and understanding
way. I was able to unpick so much of the anxiety and find ways to manage my
stress and anxiety better. I feel I now have tools to help me in times of crisis, and
it’s encouraged me to keep working on coping strategies myself. I’d like to pass
on my thanks to [staff] and the mental health team for all of their support - they
really helped me when I needed it. 
Page 205 of 396

Page 206

26 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025 
The integrated approach of the SCOPE Team helps service users to live as
independently as possible in their own communities and, as the team’s reach has
developed since it was establishment in May 2022, it has been possible to support
more and more people with their needs. The team now supports 367 people which is an
8% increase since March 2024 and has successfully prevented hospital admissions and
assisted people to return from long-stay hospital care to their community, in line with the
‘Coming Home’ ambitions. The SCOPE Team also directly supports carers of people
with complex needs for example through the establishment of a new carer peer support
group with 15 people showing an interest in sessions.
Through development of the SCOPE team as part of the Complex Care Transformation
Programme, the role of Family Group Decision Making (FGDM) Co-ordinator was
developed. This role was seen as essential to ensuring that people and their
families/carers had the opportunity and space to have their views heard and be actively
involved in the development of their support. The role was initially funded temporarily
through the Coming Home Community Change Fund for three years but has now been
made permanent. Feedback questionnaires have shown an approval rating of 4.7 out of
5 (25 responses in 2024-2025) for the service, and the comments received have been
extremely encouraging and demonstrated the positive impact the service has provided. 
To support further integration the role of Integrated Team Manager was created to
manage SCOPE’s multi-disciplinary Health and Social Care professions (Learning
Disability Health Services, Learning Disabilities Nursing, Physiotherapy and
Occupational Therapy). Work has commenced to integrate the service further moving
away from aligned services to integrated services, including co-location.
SCOPE outreach workers have supported 31 service users over the past 12 months, an
increase of six from the previous year. They have supported people transitioning to day
opportunities, college and in some instances to new accommodation. The team have
also supported independent travel, training, accessing community resources and
commencing volunteering opportunities. 
The Learning Disability Day Support Collaborative initiative, "Joining Together for a
Good Life," aims to improve day services for people with autism and/or learning
disabilities in Scotland. Perth and Kinross is one of four regions collaborating with
Health Improvement Scotland on this project. Sixty service users and/or their carers are
participating. 
4.7 out of 5 approval                        
rating for Family Group               
Decision Making. 
increase in people
supported by
outreach workers.  24% 
Page 206 of 396

Page 207

27 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025 
In recent years we have successfully developed “Core and Cluster” supported
accommodation for people with learning disabilities and autism so they can remain
within their own community. This is now being expanded to the Crieff area and
potentially to areas of highland Perthshire. This is a joint project with the community, the
HSCP and housing colleagues to explore opportunities to meet service demands and
deliver on strategic priorities of supporting people close to home, and to work with
communities to design the services they need.
The Independent Living Panel (ILP) and SCOPE Team support the local implementation
of the Coming Home Report by enabling people with autism and/or a learning disability
in a long stay hospital and/or placed outside the area to return to a community setting in
Perth and Kinross. The ILP identifies supported accommodation for people with
additional needs including those with a learning disability and/or autism. Over the past
2½ years, the ILP has supported 60 people into their own tenancies, including those
into Core and Cluster projects. This model of delivering supported accommodation has
increased the number of people supported in the community, from 332 in 2018-2019, to
413, an increase of 24%. The average cost of a package has reduced by £4.5k per
annum (for people under 65) which is evidence of the cost effectiveness of the new
model. 
Supporting people to access and remain in employment is a priority, and consultations
with those with lived experience identifies key support themes and has highlighted
barriers people experience in their education and employment. Currently the
Employment Support Team assists 83 people with complex needs to overcome barriers
and to be included in employment.
Check In Giraffe provides valuable work experience and training to those facing
barriers to mainstream work opportunities. 
60 service users/carers                              
take part in Joining                                
Together for a Good Life. 
increase in people
supported to live
more independently.  8% 
60 people with supported 
accommodation needs                            
supported to live independently                                 
in the past 2½ years. 
increase in people
supported in the
community since 2018 to
2019. 
24%
Cost of care                                                   
reduced by                                                       
£4.5k on average. 
67 different activities in 
the programme.
Page 207 of 396

Page 208

28 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025 
To improve recruitment and retention of people who are neurodivergent, and to become
a more inclusive employer, we held learning sessions for 82 managers and staff across
Perth and Kinross Council services, which raised awareness and understanding of how
to support neurodiverse colleagues. These sessions identified existing supportive
resources and areas for enhancing recruitment practices. A Health and Wellbeing
Passport was created to help employees share information that impacts their working
life with their manager, for example that they have a medical condition affecting their
mental or physical health, or that they are a carer for a family member. A staff group for
neurodiverse employees was also formed and integrated with the existing Staff
Disability Network. This partnership project led to sharing experiences at a Holyrood
Insights Conference. 
To support physical health, Learning Disabilities Service has collaborated with GPs to
provide 138 ‘annual health checks’ for people with a learning disability, in the 12 months
to February 2025. These are aimed at reducing the impact that having a learning
disability can have on people’s physical health. The Learning Disability Intensive
Support Service (LDISS) also conducted 74 physical health checks and provided
various clinics, including antipsychotic, ADHD monitoring, epilepsy, Clozapine, Down
Syndrome screening, and lithium therapy.
The Learning Disability Occupational Therapy and Physiotherapy Teams are developing
Postural Care Services and have commenced assessments of people’s needs. A
transition process between paediatric and adult physiotherapy teams has also been
established to ensure a seamless transition for young people and their families. 
The “Hear Our Roar” involvement network launched successfully in June 2024 with the
Centre for Inclusive Living, and will provide a valuable network for people with a
learning disability to take part in civic life and for their views to be heard. In February,
the group elected leaders from their membership, who will be guided by the Charter of
6,000 work experience 
hours delivered by 
Check in Giraffe. 
301 sessions and more 
than 3,500 additional 
support hours. 
“I have always felt included and valued at Giraffe. People play different roles in the
organisation, but there is no hierarchy of importance. No one person is more
important than another.” 
82 staff trained in                        
neurodiversity support                                    
for colleagues. 
138 health checks                      
completed in                                               
12 months. 
LDISS conducted                            
74 physical                               
health checks. 
Page 208 of 396

Page 209

29 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Involvement and improve the lives of people with additional support needs by
increasing their ability to shape the decisions that affect their lives.
A Neurodevelopmental Co-ordinator has improved access to attention deficit
hyperactivity disorder (ADHD) and autism assessment. Based on feedback from people
with autism and ADHD, and from their families and carers, we have implemented a new
approach within Community Mental Health services which is furthered aimed at
improving waiting times. This is at an early stage and over the coming year further
feedback and the lived experience of those that need support will be gathered and used
to shape future delivery. 
The Overnight Responder service (delivered by the Community Alarm service) uses 
technology in the form of Komp which allows people to communicate through a video
call type function which is simple to use. Dedicated staff can provide a physical
response if needed but often communication via a visual call is all that is needed. A trial
of the technology in January 2024 with five people was such a success that it has been
possible to reduce the reliance on ‘waking night’ support, improving efficiency. The
technology has since been rolled out to further people expanding the trial. This has
concentrated on Perth City with opportunities to expand the technology’s use in other
areas, being explored. 
The Brain in Hand App (further information on this is in the Community Mental Health
and Wellbeing Section) supports people with learning disabilities and autism to self-
manage their mental wellbeing. The testimonial below reflects the positive experience
of people using the application. 
Collaborative workshops and the “Collab” group have shaped improvements in autism
and mental health services. There is a strong commitment to inclusion, independence,
and co-production evident throughout HSCP services. We are enhancing our links with
TAACT (Tayside Adult Autism Consultancy Team), to improve clarity of how to access
services for people with autism. 67 people with lived experience attended ‘Collab’
workshops to drive change and improvement. The Collab gained funding to support the
development of a training resource using storytelling. 
Technology Enabled                        
Care trials reduced                        
overnight staffing needs. 
“I can now travel on buses on my own, and more often than not when I do feel
panicky, I know I can and do open my app for reminder of my tools to help keep
mind occupied and not over thinking about my surroundings.”
“Brain in hand helps remind me of appointments and keep track of my varied
mental health on a daily basis. Problems and solutions help with anxiety as I don't
have to think about solving my problem which only makes me more anxious.” 
Page 209 of 396

Page 210

30 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025 
PAMIS - 46 families in Perth and Kinross are registered with PAMIS, but the
organisation reaches many more through open, inclusive community events. In 2024,
two digital passports were supported and developed. 
We regularly connect with people who access our services to hear about their
experiences and explore what matters most to them. The poster was created by a
person supported by the care provider Ark at a Continuous Conversation event at
Rannoch Road. The poem was composed by a member of staff after conversations with
people in Core and Cluster accommodation and the testimonial reflects the positive
impact on someone of being able to live independently. 
Lived experience shapes                               
services, 67 people attended                                  
‘Collab’ workshops. 
219 enquiries and 100 online 
meetings. 50 face to face meetings
and events.
”PAMIS staff consistently go above and beyond to support our family.”
“PAMIS are always such a great support to me.”
“Knowing that there is a family support service available in my area gives me great
reassurance.” 
Page 210 of 396

Page 211

31 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025 
Older People’s Services
As the Older People’s Strategic Delivery Plan (2022–2025) concludes, significant
progress has been made in transforming services for older adults, despite ongoing
demographic, financial, and workforce challenges. The key themes for this
transformation are early intervention, shifting the balance of care, and optimising
capacity and flow, each of which has seen tangible progress.
Early intervention
Early intervention efforts have expanded significantly. Programmes such as CAPA
(Care About Physical Activity), dementia-friendly walking routes, and the Go for Gold
initiative in care homes have promoted physical wellbeing and social engagement.
Our Age Friendly work continues to develop, with a range of projects/groups being
developed seeking to identify the challenges faced by older residents, and
collaboratively develop practical solutions. We also celebrated International Day of
Older People (1 October) with an event in the Civic Hall with several community groups
What My Home Means to Me – A poem reflecting conversations with
some people in Core and Cluster accommodation
In my own house, my name on the door, A place of pride, I cherish and
adore. Walls painted in colours I chose with care, A garden where I breathe
the fresh air.
Quiet surrounds me, peace I find, No more noise, just a tranquil mind.
Visitors come, family and friends, no staff needed, we feel safe.
I live my best life, with space to roam, Shows and discos, I call it home.
Holidays planned, adventures await, From Poland to Wales, memories
create.
In the countryside, I feel alive, Walks and bus rides, I thrive. Football banter
at the local pub, Outreach Garden, a social hub.
More space now, no single room, Intercom buzzes, no need to assume.
Support planned, week by week, Staff who listen, changes we seek.
From homeless unit to a flat so grand, Quiet and spacious, a life well
planned. Fitness shared, tips and tricks, Cats to care for, my heart they fix.
Plans in place, two weeks ahead, Time alone, no longer a dread. Finances
managed, cooking too, Dreams of learning, a car brand new.
My home is more than walls and floors, A place to grow, to laugh, to be. This
is what my home means to me. 
Page 211 of 396

Page 212

32 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
coming together, which highlighted the range of options and activities available to older
people in their communities. 
1 October at Civic Hall event to commemorate International Older People’s Day.
Over the 2024 Olympic period, 20 care homes and three day centres took part in the
annual Go4Gold challenge. Residents and service users take part in physical and
wellbeing challenges in their own setting. This themed event was jointly facilitated by
the HSCP and Scottish Care. Watch the full awards ceremony, Go4Gold 2024 (18.39
minutes) – with additional footage from parties at care homes to celebrate. 
We have supported the upskilling of staff from Live Active Leisure to enable them to
deliver evidence-based falls prevention classes. These classes are based on later life
training, postural stability instructor training, and have been shown to be highly effective
in reducing falls among community dwelling older adults. 
Wellbeing Community Classes bridge the gap for older people between their home and
Live Active facilities. They give the opportunity for people to be active in their
community, closer to home. Over 2,000 Wellbeing Community Classes have been
delivered supporting over 20,000 individual attendances with some people attending
multiple classes. Examples of the types of activities undertaken include chair based
social classes; social circuits; aqua circuits/aerobics; chair-based yoga. 
Page 212 of 396

Page 213

33 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025 
Volunteer engagement has also grown, with 110 active volunteers supporting care
homes, inpatient settings, community services, clinics for vaccination and hearing aids
and inpatient areas. 
Stanley Development Trust supports people to lead independent, healthy and active
lives through activities and by creating a safe and sustainable place for further
generations, by encouraging all members of the community to engage. Weekly soup
and sandwich clubs attract older people who may not otherwise leave their homes. 
Stanley Development Trust have become members of Age Scotland, giving access to
training and resources specifically for older people. 
20,000 attendances                   
at over 2,000                            
wellbeing classes. 
110 Volunteers              
supporting people                       
and services 
“I enjoy working side by side with others, making sure patients don't feel alone or
simply just putting a smile on their face. I feel privileged to be one of those who are
able to sit and talk to people, who may not have anyone else to talk to.” 
“Volunteering is about purpose, responsibility, and friendship. After being away
from work for a while, volunteering has allowed me to work towards a needed
service under a supportive team. It has given me the chance to be responsible
without too much pressure and to grow those responsibilities as I recover. Lastly, it
has given me new friends and acquaintances which make the volunteering
enjoyable and make me feel a part of something bigger.” 
“The volunteers we have here at MoveAhead are an integral part of the team
when it comes to the facilitation of the many groups that we have running at
present. All of our volunteers go above and beyond what is expected of them in
the respective roles. The service that the volunteers provide ensures that the
groups can continue to run and also allows the MoveAhead staff to carry out their
work supporting people in their local communities. I would like to take this
opportunity to thank them for their continued support and service.” 
496 attendances at
the Lunch Club in
2024.  7%
280 attendances at 
the Soup Club in 
2024. 
“Soup and lunch clubs are great value for money and a good social occasion for
older people.” 
Page 213 of 396

Page 214

34 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Shifting the balance of care
In shifting the balance of care, 113 people were supported by local integrated care
services to remain at home and avoid crisis placements or hospital admissions service
(between April 2024 and February 2025), and urgent care Advanced Nurse
Practitioners are working with locality teams to develop integrated hubs across Perth
and Kinross. In Perth City the integrated hub is fully established enabling rapid, multi-
disciplinary responses to people when their health deteriorates. 
Dementia support has expanded through Alzheimer Scotland’s Brain Health Centre and
dementia cafés, with 275 Post Diagnostic Support (PDS) referrals made to Alzheimer
Scotland and 279 people receiving PDS (Post Diagnostic Support).
Alzheimer Scotland – The number of people receiving post diagnostic support rose
from 258 in January 2024 to 289 in December 2024. 
Technology-enabled care has also advanced. The Community Alarm service handled
260,911 calls, with 99.26% answered within 60 seconds, up from 98.83% the previous
year. This service now supports over 3,900 clients and 12,000 devices, ensuring timely
responses and enhancing safety at home. 
Within the stroke unit at Perth Royal Infirmary a more person-centred approach has
been developed. People who have suffered a stroke are now assisted to identify
individual rehabilitation goals that are achievable and meaningful for them. Uptake and
maintenance of person-centred goal planning is monitored regularly and has become a
routine part of service delivery.
Optimising Capacity and Flow
Progress in delivering the DWD programme was presented to the IJB in March 2025.
This programme takes a whole system view of the discharge process and is
113 people                      
supported to                      
remain at home. 
“Our Link Worker was extremely kind, sensitive and professional with our family
and particularly Mum. Very practical guidance, readily available and flexible. I
found her support to be invaluable in the early stages of Mum’s diagnosis, when I
was struggling to access support via Social Work. My only criticism of the service
is that it ends too soon, because I suspect things are just going to get more
challenging. However, I massively appreciate the support we have had and the
Link Worker was wonderful.” 
Over 99% of Community                     
Alarms answered                                
within 60 secs. 
Page 214 of 396

Page 215

35 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
transforming the flow of people through inpatient services and back to their home as
early as safely possible. The national target for delayed discharges is set at fewer than
34.6 per 100,000 adults which has been consistently met in Perth and Kinross. This
translates to 97.6% of adults being discharged without any delay. 
Key to this progress has been the redesign of Care at Home services. A new alliance-
based contract introduced in September 2024, brought 15 providers into a collaborative
model, improving flexibility and responsiveness, and this has helped increase hours of
delivery from 6,302 to 8,073. This model of delivery is helped by the introduction of
technology where providers access a mapping tool (PinPoint) which identifies where
people need support with a new or altered package of care. Internally, HART and
HART+ (Home Assessment and Reablement Teams) were restructured to support a
Discharge to Assess model, enabling more personalised and timely discharges.
Internally, teams delivering care at home have supported 256 people (an increase from
230) and increased hours of delivery from 1,450 to 1,847.
These changes, alongside innovations such as the use of mapping tools, have helped
reduce unmet care needs by approximately 800 hours since August 2024. 
As part of Older People’s transformation, we have developed individual communication
and engagement plans as part of our process and we work closely with the
engagement team to deliver this. Care Opinion is in place for all Older People’s teams,
and the feedback is used to enhance and redesign services where needed.
These achievements lay the foundation for future transformation. A ten-year Ageing
Well Strategy is in development, aiming to address the complex needs of our ageing
population, with the focus remaining on delivering high-quality, person-centred care,
which enables older people to live well, independently, and with dignity in their
communities. 
97.6%                                  
of adults DWD. 
Unmet need                          
reduced by  800 hours 
increase in internal
care at home hours
provided. 27%
increase in external
care at home hours
provided. 28%
Page 215 of 396

Page 216

36 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025 
Case Study - In January 2024. Rannoch Community Trust and Dunkeld, Birnam
and District Community Development Trust collaborated to co-produce a
community led approach to provide social care services for their communities.
There have been a number of social work and social care representatives who
are involved in project discussions. Consultation was undertaken with people who
reside in Kinloch Rannoch in March 2025, this community asset project continues
to develop and a service level agreement has been established to which
formalises the nature of the service delivered. 
Testimonial - My Mum, who was 94 at the time, had a fall in her kitchen in
mid-January and fractured her pelvis. She spent four weeks in Ninewells
Hospital, Dundee and on her return home to Auchterarder she received care
from the HART team. From the outset, the team was very professional;
understanding of my Mum and her needs and exceedingly patient. I was
concerned that she would have difficulty accepting care from male staff, but
this was never the case. The aim of the carers was to always let her do as
much as she could herself, make her own decisions about how she would
like to do things and to do those things at her own pace - nothing has ever
been rushed. Her short-term memory was badly affected when she came
out of hospital, and this has led to a lot of confusion and lack of confidence
for my Mum. This has remained a problem but with the ongoing patience
and care from the team, her confidence has improved, and she can now
manage her medication, which is sent in a weekly tray from the pharmacy.
She also manages to get most of her meals by herself although she likes to
have reassurance from her carer that she is doing things correctly.
The family was involved in her care plan, and she was given a key worker
who was extremely knowledgeable and informative about what the carers
hoped to achieve. It was decided that one carer in the morning, teatime and
nighttime would best serve her needs, and this has worked very well. My
Mum now tends to doze quite a lot during the day, and the morning carer
can assist with getting her lunch ready, if necessary. Help was also provided
with bin collection. We were not aware that such a thing as "assisted bin
lifts" existed and this has now been organised and makes everything much
easier. 
Page 216 of 396

Page 217

37 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025 
Carers
Delivery of the Joint Carers’ Strategy 2023–2026 is designed to have a positive impact
on carers through a co-production approach, ensuring carers are valued, recognised,
supported and empowered. An Equalities Impact Assessment was completed prior to
the approval of the Carers’ Strategy to ensure no negative impacts of the actions in the
strategy for people with protected characteristics. 
Continued - A carer is present when my Mum has a shower, although she
likes to wash herself, and this gives both the family and Mum great peace of
mind as she can be quite unsteady on her feet. My Mum's preferences are
always asked for, and permission given, before anything is done - the very
definition of Person-Centred Care. The carers are all very good at keeping in
contact with myself and they are willing to have a chat and let me know how
Mum is doing or if there is anything I need to know. I have had regular
updates from her key worker, both by email and phone calls, and as I live in
Devon this has been of great comfort, knowing that she is in very capable
hands and her needs are being looked after. I cannot say enough good things
about the HART team. Their excellent training and abilities shine through. I
used to get myself very concerned about Mum being alone at home after my
Dad died in 2014. She values her independence greatly and wants nothing
more than to remain in her own home. After meeting the HART team, seeing
their commitment to my Mum and seeing the improvement in her confidence
over the past weeks, we now know that she can remain in her own home, with
carers, at least for the foreseeable future. My brother, myself, my Mum and
the entire family are eternally grateful to HART; many thanks to you all for
your kindness, commitment and care. 
Testimonial - I was referred for a consultation to Occupational Therapy to help
me to manage worsening arthritis in my hands. My Occupational Therapist was
very friendly and approachable; she listened well and was very knowledgeable
about how to treat my condition. She gave me a number of aids to use if and
when I need them and advised me how to keep my hands as protected and
healthy as possible. I saw her again two weeks later and she then gave me
exercises to do and explained them fully. I then saw her six weeks after that and
was able to see the benefit of doing the exercises and a marked improvement in
my grip strength. I found the sessions very useful, and I see how important
protecting my hands through strengthening exercises and extra care is for the
future. 
Page 217 of 396

Page 218

38 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
The number of carers continues to grow, as reported in the most recent National Carers’
Census (21% increase from 2023-2024). Support to carers is provided by dedicated
Carer Support Workers based in integrated locality teams. There are a further six
funded Carer Support Workers, supporting carer needs in SCOPE and iDART teams,
Day Services, Hospital-based and Palliative Carer Support. This promotes early
identification of carers across the spectrum of needs and enables quick and effective
support. 
Adult unpaid carers have a right to an Adult Carer Support Plan which identifies carers’
personalised outcomes and applies self-directed support options by dedicated carer
support workers and wider assessing teams (Access Team). Any needs which meet the
eligibility criteria, and cannot be met through universal or commissioned services, are
supported internally. In 2024-2025, 692 unpaid carers were supported by statutory
services. This includes the application of self-directed support, for example providing
replacement care through day centres, the sitting service and residential respite.
Replacement care allows carers to get a vital break from their caring role. Breaks
enable carers the time for social, recreational, emotional or therapeutic activities, and
supports improved life balance. 
The provision of personalised support strives to reduce any negative impact of caring,
and to enable carers to continue to provide care. During the lifetime of this strategy
there has been a significant reduction of funded permanent placements due to carers
not feeling able to continue their caring role, reducing a further 10.5% this year alone,
from 17.5% to 7% (April to December 2024). Not only does this suggest carers feel
more able, but importantly, it also allows the cared for person to remain in their own
home and community. 
166 adult unpaid                     
carers received                      
Respitality Breaks. 
252 adult unpaid                   
carers were referred                         
to Live Active. 
472 carers received                              
grants under the Time                                 
to Live Scheme. 
Page 218 of 396

Page 219

39 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
PKAVS Carers’ Centre - One of the standout achievements for the Carers’ Centre in
2024 was being awarded the Carers’ Trust for Carers’ Quality Award, a recognition of
commitment to outstanding service delivery. PKAVS had 1,622 Adult Carers registered
to their service this year, increasing 15% from June 2024. The Carers’ Centre has
delivered the following supports to carers in 2024-2025. 
Carers are at increased risk of inequalities, including financial exclusion. Work with the
Carers’ Centre, along with internal assessments, identifies carers experiencing financial
difficulties. This work enables carers to be signposted to the Citizens’ Advice Bureau for
financial advice. Citizens’ Advice Bureau have supported 847 unpaid carers, mainly with
debt and energy advice. This is an increase of 40% from last year. 
3,810 day centre spaces provided for cared-for individuals, offering carers
valuable respite.
359 short breaks awards distributed through various funding streams.
672 packs of complementary therapy vouchers issued.
Telephone Support: 7,026 outgoing calls made.
Information and Advice: 27,540 requests handled.
168 adult carer support plans/self-assessments and 53 Young Carers’
Service delivered.
3,296 personal outcomes supporting 1,066 carers actioned.
179 counselling sessions provided for adult and young carers.
847 private tuition sessions delivered to 78 young carers approaching exams. 
127 adult unpaid carers               
signposted to Citizens’ Advice                          
and Welfare Rights by PKAVS. 
Citizens’ Advice supported                              
847 unpaid carers, mainly                             
with debt and energy advice. 
“My husband has been attending the Day Centre every Wednesday for nearly a
year. When I pick him up, he is always cheerful. I know he has enjoyed himself,
even if he cannot always recall the details. This helps me relax during the precious
hours I have to myself.” 
Page 219 of 396

Page 220

40 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025 
Carers have improved access to clear, accessible information, including refreshed
online content, multilingual resources, and animated videos on Looking After Someone,
Carers’ Rights, Emergency Planning for Carers, and Financial Support for Carers.
Training opportunities are provided for unpaid carers to enable them to feel confident in
their caring role. Additionally, we have targeted areas we know carers are likely to
attend. We have worked with the GP Communication Group to improve identification of
unpaid carers in GP practices, deploying information across 28 sites including GP
surgeries and vaccine centres. Information resources are provided and promoted
across community groups on potential support options for carers. 
Improvement work for the Carers’ Centres online resources is underway, and
improvements have been achieved relating to information on the support carers can
access at different transitional points in their caring role.
Perth and Kinross Healthcare Improvement Scotland Frailty project strives to provide
carers with useful information about the cared for person’s needs. This safeguards the
person who is cared for, reducing the risk of readmission, and promotes the safety of
the carer in their caring role.
Training opportunities are provided for unpaid carers to enable them to feel confident in
their caring role. In 2024-2025, the Carers’ Centre ran 61 training courses with 291
attendances. 
Multi-disciplinary team meetings and assessments ensure key information about
individuals is shared appropriately. The Emergency Planning document for Carers has
been revised so that the information recorded is complete for care and treatment
planning, and translations are available in four languages, and in easy read.
“The opportunity to
attend trips and meet
others in a similar
position restores a
sense of normality
when things seem
tough.” 
“Young Adult Carer events always
have a positive atmosphere and
act as an escapism from any
anxiety and stress. Thank you to
all involved. We had a marvellous
afternoon, met new friends, and
have a better idea of what is going
on with support for carers. Food
was amazing and the company
fantastic. It has been great getting
away from my mundane daily
tasks. Thank you again for a
wonderful day.” 
61 PKAVS training                       
courses with 291           
attendances. 
Page 220 of 396

Page 221

41 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Change Mental Health provide support to unpaid carers looking after someone with
mental health needs and the Carers’ Centre signposts to relevant agencies. Carers’
assessments provide information around what carers need and information sharing
protocols with other agencies have been developed so people do not have to share
information multiple times. This is something people find frustrating and can be a barrier
to access. 
The Hospital Discharge Team are supported by a Hospital Link Worker which has
improved information sharing and supported discharges better, by ensuring carers have
the information they need to continue in their caring role. Peer support groups, including
cafés and a Carers’ Choir, have grown, and 360 grants were awarded to enable carers
to take breaks. 
Carer Support Workers are embedded across services, and training has been
enhanced for both staff and carers. The Training Programme for The Carers’ (Scotland)
Act equips the health and social care workforce with the relevant knowledge to assess
carers, and to enable effective supports to meet their individual outcomes. 117 Health
and Social care professionals have undertaken this training over 21 sessions.
Carers who are in employment can face additional barriers and challenges. Ongoing
work to increase the number of Carer Positive employers aims to encourage supportive
and inclusive workplaces for carers. This work has included our attendance at a local
Careers Fair, employers’ fora, and using our presence as a commissioner to promote
this vital initiative to help unpaid carers remain in employment. Perth and Kinross
Council, NHS Tayside, our local Carers’ Centre, and Change Mental Health are all
Carer positive employers, supporting the health and wellbeing of our employees who
are also unpaid carers.
The National Census and the Carers’ Census are used to gather feedback and
evaluation to understand the impact of inequalities on unpaid carers including financial
exclusion. Our work with PKAVS Carers’ Centre and signposting to Welfare Rights and
Citizens’ Advice is intrinsic to the assessment of the financial impact of a caring role
when undertaking an Adult Carers’ Assessment. 
Carers are actively involved in service planning through Carers’ Voice and through other
strategic groups embracing the principles of Equal, Valued and Expert. 
Independent Advocacy is commissioned from Independent Advocacy Perth and
Kinross (IAPK), which received 1,607 new referrals in 2024, and a total of 2,205 people
were supported. 29.8% of referrals were for people who had previous IAPK support.
Independent advocacy is offered to all service users including those whose liberty is
restricted, for example, 116 referrals were for people in prison, and 59 referrals for
inpatients of Rohallion forensic services. 25 referrals were for people supported by drug
and alcohol services. IAPK supported eight Large Scale Investigations and 15 referrals
360 grants                                
enabled carers                                  
to take breaks. 
Page 221 of 396

Page 222

42 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
were for unpaid carers. The New Scots Project was started in 2024 to support those
living in Perth seeking asylum to navigate barriers and opportunities. 
Crossroads held their annual coffee morning with approximately 175 people attending,
including care staff, board members, office staff and service users and carers. This is a
very popular event, allowing staff to meet people they speak to on the phone and it lets
the volunteer board members meet staff and services users. 
The Supporting Unpaid Carers’ Booklet was revised and promoted across community
settings for Carers’ Week 2024. Promotion within communities at various times and
venues throughout the year is highlighted on the Staying Connected map. 
Carers’ Week 2024 – Putting Carers on the Map Total
Community Engagement – events happening within communities 45
Community Support – unpaid carers groups. 21
Information Drops – public access points. 105
Information Mail Drop – GP surgeries 28 
“No one understands me, thank you for taking the time to listen and understand.”
“You've been a huge support to myself.”
“Your professionalism, passion, enthusiasm and caring nature should be bottled
and given to everyone.”
“They felt safe to express their views to you.”
“Thank you for being there.”
“I don’t think I'd have had the same response if I had done this on my own.” 
Page 222 of 396

Page 223

43 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025 
Substance Use
In 2024-2025, the Perth and Kinross Alcohol and Drug Partnership (ADP annual update
report) made substantial progress in delivering its Strategic Delivery Plan, focusing on
prevention, harm reduction, recovery, and family support which was person-centred and
trauma-informed.
Testimonial from
Carer supported by
North Locality Team -
Thanks again you
wonderful woman, have
made me feel like
there’s hope again. 
Testimonial from Carer
Supported by South Locality
Team - Thank you for all you’ve
done. We have a new carer,
who I think will be really good.
She’s very nice and first day is
this Saturday so I can visit my
sisters. I’m very excited. 
Testimonial from a Carer supported by Scope Team - My family moved to
Perth and Kinross three years ago and within weeks I had a meeting discussing
my role and needs, something that had never happened before! As a result, I
was granted four hours weekly respite which I use on Friday mornings. This
gives my son a busy time and allows me time to relax before the weekend. I
have also used funds for an overnight away leaving the Personal Assistant in
charge. My Carer Support Worker has encouraged me to consider doing this on
a more regular basis and has said that she will fully support me in applying for
funding. I also regularly receive information on meetings and events that are
relevant to my situation. With the help of my support worker, I was recently
awarded funds from Time to Live to attend a Linocut two-day workshop which I
thoroughly enjoyed. I know that I can contact my Carer Support Worker at any
time to discuss my needs and that she has a good knowledge of my situation. 
Testimonial from Carers’ Centre - I'll never forget the support I have received
from PKAVS and The Carers’ Trust. I've met with such kindness and care from all
of you, during such a heart-breaking time, at the loss of my son. Another part of
journey. The £400 received in my bank on 23 December 2024 came at such a
time for me to be able to catch my breath and time to refresh. I came into the
centre because I knew I needed to do something. I took to the lady I spoke to
straight away; she was so kind. She must have thought I was crazy, but it was so
easy to open up to her. Even today speaking to you, I normally need to see
someone’s face to get to trust them, but I can hear in your voice that you really
care and that I can trust you. Thank you for calling and for listening. 
Page 223 of 396

Page 224

44 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
There was a significant expansion in youth and community engagement, with 25 people
completing the Professional Development Award in Youth Work, and 14 more are
scheduled for training. The Drug Ambassador Project was successfully integrated into
the Mental Health Ambassador Programme, now active in all high schools, promoting
early intervention and reducing stigma.
More Alcohol Brief Interventions (ABIs) were delivered than had been achieved
previously, with 158 delivered in the final quarter alone, which is the most delivered in
any quarter in recent years. There has been a reduction in drug-related deaths over
2024-2025, and community-based recovery has been strengthened through peer-led
initiatives, lived experience networks, and wider Naloxone distribution, with a 37%
increase from quarters three to four.
There has been an increase in the number of reported Nitazene detections, which are a
new group of potent synthetic opioids, posing a substantial risk of overdose, drug-
related hospitalisation and drug-related death. In response, the ADP commissioned
Turning Point Scotland (TPS) to undertake a local drug testing project. The three-month
study saw staff from the TPS Perth and Kinross Floating Housing Support Service
offering Nitazene testing strip kits to people known to be using street drugs and offering
harm reduction advice, and ensuring people have naloxone and know how to use it. 
This project is being evaluated and, if successful, the ADP will work with other partners
to widen the roll-out of drug testing strips.
The ADP also strengthened its Recovery-Oriented System of Care (ROSC), ensuring
more integrated and person-centred support to provide the right support, at the right
time for individuals, families and communities impacted and harmed by alcohol and
drugs. This will be further supported in 2025 as the ADP has partnered with SRC
(Scottish Recovery Consortium), a national organisation which supports, represents
and connects recovery across Scotland.
Progress in introducing MAT (Medication Assisted Treatment) Standards has already
seen improvements to the services that people receive. This is evidenced by more
people starting treatment and shorter waiting times for treatment to commence. The
ADP has also expanded access to treatment, with 80% of those referred offered
appointments within three weeks. For Opioid Substitution Therapy (OST), although the
caseload declined slightly from 471 to 446 over the year, people who accessed
treatment have had the benefit of three options for their OST, and 75% of people
offered the treatment receive a prescription within one day of engaging with the service.
Community engagement flourished with the launch of a new ADP website, the
expansion of recovery cafés in Perth City, Pitlochry and Aberfeldy, and the second
annual RecoverMay celebration, which included events like art exhibitions, recovery
coaching graduations and outdoor activities like the Ben Vrackie Walk.
Recognising the impact of substance use on families, the ADP funded several
initiatives, including Hillcrest Futures, Tayside Council on Alcohol’s Birch Project, and
Barnardo’s Hopscotch. These services provided trauma-informed, whole-family support,
addressing both prevention and recovery.
Page 224 of 396

Page 225

45 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Tayside Council on Alcohol (TCA) - Through the delivery of counselling and creative
therapies, the TCA supports individuals experiencing difficulties, or with concerns
around alcohol, gambling, cannabis, cocaine and other non-opioid recreational
substance use. TCA also provides support to significant others who are affected by
these issues within their family or wider social network. From January to December
2024, there were 224 new referrals and a wait time of three months. All clients had a
first contact appointment within three weeks of referral, and these had an engagement
level of 72%. For assessment and one to one counselling appointments the
engagement level was 71%.
iDART (Integrated Drug and Alcohol Team) moved to significantly improved premises,
valuing people who use services and providing support in a quality, trauma-informed
environment. During 2024-2025, the team developed a multi-agency consultation hub
for people with co-occurring mental health and substance use issues who require
additional support or specialist care and treatment. Coupled with the continued
development of a local mental health and substance use protocol, this will ensure that
people will benefit from a whole system, person-centred and evidence-based care plan
throughout their recovery journey. This will build on the improvements already
evidenced following the implementation of MAT Standard 9. 
Overall, the ADP’s work in 2024-2025 reflects a comprehensive, collaborative approach
to reducing harm and supporting recovery across Perth and Kinross. Collaborative
working with third-sector partners, Police Scotland, and NHS Tayside has underpinned
progress, ensuring services are responsive, inclusive, and aligned with the national
mission to reduce drug harm and save lives. 
Skinnergate supported 99 people over the year. It is now a pet friendly temporary
accommodation service which improves the emotional wellbeing of residents. Five dogs
were accommodated with their owners over the year. The first "Sober Event" was held
in Perth and included music, comedy and food. A Recovery Café was started, and it
provides a safe, supported environment. Trauma informed spaces were introduced
within the unit for staff and clients. 
Adult Support and Protection
A multi-agency approach to safeguarding people is taken in complex cases of adult
protection concerns. The Adult Protection Committee (APC) programme of self-
evaluation and audit work shows that where complexity exists, we use the Adult
Support and Protection Act to deliver a multi-agency approach to safeguarding.
“Skinnergate saved my life.” 
“The staff go above and beyond.”
“Love the new residents’ lounges.”
“Great place to be.”
Page 225 of 396

Page 226

46 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Analysis of adult protection referrals has led to the implementation of triage pathways
for referrals of those considered at risk of harm who experience addiction and/or mental
health concerns. This supports the principles of early intervention and prevention within
an HSCP context.
The ASP assessment framework was refreshed and updated using the findings from
the ASP audit and self-evaluation work. It takes a more qualitative approach and
focusses on the impact and the outcomes for the adult and his or her unpaid carer.
The APC (Adult Protection Committee), made up of representatives from a wide range
of professions including Police Scotland, Social Work and Health, supports a trauma
informed approach to safeguarding and, to embed this in all that is done, specific ASP
trauma informed e-learning has been developed for staff. The APC sees engaging with
adults and their unpaid carers throughout the ASP episode as a key area for
improvement. The APC audit following the publication of national Adult Support and
Protection guidance in this area supports this. 
Our Adult Support and Protection workforce is sufficient to ensure that those who live in
urban and rural areas are safeguarded under the ASP Act equally. In terms of cross
cutting work, the adult and child protection committees are undertaking joint community
engagement work with the Letham community to understand what adult and child
protection means to them.
Lead Partner Services 
A recent report to the IJB, Lead Partner Services Perth and Kinross, outlines the
responsibilities for Perth and Kinross IJB in relation to lead partner services. The Lead
Partner Services Update for Angus gives an update on the position of the services for
which Angus IJB holds lead partner responsibility.
Public Dental
Our Public Dental Service (PDS) is delivered Tayside wide, taking forward the following
priorities:
• Continued provision of dental services and preventive care for core PDS patients
across Tayside. (Core PDS patients are those who cannot access care in
general dental services). 
• Maintain current service levels for sedation referral service for children and
adults.
• Maintain current service levels for paediatric and special care adult referral
service.
• Maintain current service levels for general anaesthetic (GA) paediatric exodontia.
• Improved GA access for special care adults.
• Continue rolling programme of dental examinations and comprehensive dental
care for Care Home residents.
• Respond to patient feedback particularly through Care Opinion as a means of
continued service improvement. 
Page 226 of 396

Page 227

47 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
The service provides care for people in high priority and vulnerable groups that cannot
access dental care elsewhere. It provides a referral service for treatment which requires
general anaesthetic or sedation, and for patients requiring specialist input. This covers
a wide range of dental care for paediatric and adult patient groups. Teaching for
undergraduate dental and dental therapy students is provided through the Outreach
Teaching Programme, and there is a daily emergency service for unregistered patients. 
Dental care is provided at fixed clinic locations, in prisons, care homes and hospitals
and in domiciliary settings. The service operates a mobile dental van for socially
excluded groups and special care patients who cannot leave their care home setting
and there is provision for bariatric services and wheelchair access at fixed clinics in
Perth, Dundee and Arbroath. Patients can be treated in their wheelchairs. 
NHS Tayside’s Oral Health Improvement Team continue to deliver the national oral
health improvement programmes (Childsmile, Caring for Smiles, Mouth Matters,
Smile4Life and Open Wide) with ongoing development to collaborate with wider
partners and reach out to support those at greatest risk of poor oral health. Based on
clinical evidence, the Childsmile programme is adapting to focus on the aspects which
have been demonstrated to be most clinically effective. Over the next two years there
will be a change in emphasis to focus on supporting children and families from the most
deprived areas and to optimise the supervised toothbrushing programme in nurseries
and targeted primary schools, which has been shown to be a hugely successful cost-
effective intervention.
The PDS delivers the National Dental Inspection Programme (NDIP) every year and
assesses the dental health of Primary 1 and Primary 7 children. This data supports
access to dental care for vulnerable and high-risk children. The NDIP report published
in October 2024 describes the detailed inspection of Primary 1 children during the
academic year 2023-2024 when 74% of Primary 1 children were found to have no
obvious decay experience, similar to the national figure of 73.2%. These figures had
remained relatively stable since the previous detailed inspection of Primary 1 children in
2019-2020 (73.4% in Tayside and 73.5% nationally). No detailed inspection was
undertaken from 2021-2022 as a result of disruption during the pandemic. 
NDIP reports have consistently described a social gradient in oral health, with children
from more deprived areas more likely to have experienced dental decay. This is evident
in Tayside in both Primary 1 and Primary 7 with children from less deprived areas being
more likely to receive a report of ‘no evidence of cavities’. At national level, based on
results of detailed inspections it is notable that the 2024 report, for the first time,
describes improved oral health only in Primary 1 children from the most deprived areas
(SIMD 1 and 2), with a slight worsening in children from less deprived areas. Though
clear inequalities in oral health remain evident the gap has reduced slightly.
74% of P1 children                                  
have no obvious                                         
dental decay. 
Page 227 of 396

Page 228

48 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
General dental practitioners have been recruited to work sessions in Perth Prison to
address waiting lists there. Limited access to adult special care general anaesthetic lists
and subsequent long waits are being addressed at Board level. The Public Dental
Service continues to face some recruitment challenges and there are still some vacant
dental officer positions. Several training level posts were also unfilled this year and this
has also had a negative effect on service provision. 
Demand for dental care is high, and the availability of General Dental Services is limited
with only one practice in Perth and Kinross currently accepting new NHS patients
(limited postcodes only). Further specialist services, including emergency care is
provided for unregistered patients via Dundee Dental Hospital. 
We have reduced waiting times for paediatric tooth extraction. The median wait in
Tayside is now 59 days. 92% waits are under 26 weeks (Scottish figure 65% waits
under 26 weeks). 
The Public Dental Service deliver a highly valued drop-in service for people
experiencing homelessness or experiencing addiction through a Mobile Dental Unit
which visits locations such as The Steeple in Dundee. The Public Dental Service works
with partner organisations such as Parish Nursing to deliver care to this vulnerable
group. The value of this service has been recognised through awards including the
Tackling Health Inequalities Award at Scotland’s Health Awards 2024, and the bronze
award for Social Impact and Global Citizenship at the 2024-2025 NHS Tayside Star
Awards. 
The undergraduate teaching provided through the Outreach programme has delivered
consistently high standards of teaching for undergraduate dental and therapy students
from the University of Dundee, and University of the Highlands and Islands. The
Outreach service allows patients who do not meet the Public Dental Service remit but
are suitable for student teaching to receive care under supervision at our centres. The
Outreach centres at Broxden Dental Centre Perth, Kings Cross Dundee and Springfield
92% waits under 26                       
weeks for paediatric                           
tooth extraction. 
Page 228 of 396

Page 229

49 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Medical Centre Arbroath were inspected by NHS Education for Scotland this year and
all received excellent reports. 
Podiatry
NHS Podiatrists are experts in all aspects of foot and lower limb function and health;
relieving pain; maintaining tissue viability; treating wounds; keeping people mobile and
active, thereby supporting people to maintain their independence and quality of life.
The podiatry service supports the National Preventative and Proactive Care Agenda by
identifying and mitigating the impact of future foot health demands and reducing the
burden on both primary and secondary care. Demand for the service remains high,
driven by an ageing population and a growing number of people presenting with long
term conditions leading to complex lower limb problems, resulting in greater
dependency on the service. 
The service has a fluid and constantly evolving clinical caseload of approximately 6,379
people and delivered approximately 46,071 patient contacts in this year. The referral
rate remains consistent at an average of 600 per month. Podiatry new patient referrals
are prioritised as follows:
Testimonial - My Dad developed a gum abscess and subsequently required
treatment to resolve this. He was reviewed by a very kind and caring Dentist
called [name] who was accompanied by a Nurse called [name]. They were both
extremely friendly, supportive and very professional in a time when my Dad was
experiencing pain and discomfort. In addition, my Dad was anxious as this was
affecting the caring role he provides for my Mum. My parents are elderly and
mostly housebound, so the domiciliary care and attention delivered by both was
beyond excellent. They provided the relevant dental treatment and reassurance
with a calm approach which made the world of difference to my Dad. Our family
are extremely grateful to [them] and can’t thank them enough for their support
and kindness. 
Testimonial - I started to get toothache and swelling but being so scared of the
dentist I ignored the is for a few days until it got to the point where I had to call. I
phoned Broxden and got an emergency appointment with a fifth year dental
student. Her and the dental nurse could not have been nicer to me. They were so
kind and explained everything, even wiped my tears as I was so scared. The
treatment all went so smoothly, and I didn’t feel a thing. 
600 people per month                           
are referred to Podiatry             
resulting in over 46,000                   
patient contacts. 
Page 229 of 396

Page 230

50 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
• Urgent - infection/ulceration – appointed within five working days.
• Soon – moderate/high risk diabetes foot risk score, severe peripheral arterial
disease, nail surgery – appointed within 12 weeks.
• Routine – referrals that do not indicate any condition which puts the person at
immediate risk but meets the clinical criteria for assessment are placed on a
waiting list with a target date of 18 weeks.
The service continues to meet the ‘urgent’ and ‘soon’ targets. Improvements have been
made over the last year in relation to the routine waits, with 308 people waiting over 18
weeks at the end of April 2024, reducing to 93 at the end of March 2025. Recruitment to
podiatry posts continues to be a national issue. In response our service has increased
its capacity for student placements and improved the placement programme offered to
them. As a result, we have been able to appoint new graduates over the past few years,
including four full-time equivalent graduates this year. 
The service has worked collaboratively with the Scottish Social Services Council
(SSSC), and NHS Fife to produce two, foot care resources – Personal Care for Feet
and CPR for Feet. These are designed to support staff working in various care sectors
to help them maintain and improve their knowledge and skills in footcare.
Below is an example of the impact of the learning from these resources:
“I've discussed the importance of feet care with a colleague, who again was not aware
until discussing how important feet care is in our line of work, and we both never
realised how dangerous pressure ulcers can be, never realised people could end up
needing amputation through this.”
In the previous year, the service introduced Care Opinion to gain feedback on the
Podiatry Nail Surgery Service. During this reporting period Care Opinion has been
rolled out to include Podiatry Musculoskeletal and Rheumatology Services. 
Testimonial - My daughter aged 10 had to have a partial toenail removal due to a
recurring in growing toenail. The podiatrist and healthcare worker who dealt with
my daughter were truly wonderful. They were so good with her as she was really
scared, they made a very frightening experience for her as easy as possible. 
Testimonial - I attended in the morning, the podiatry/rheumatology department at
PRI, Perth and wanted to express my thanks for the staff members I met with.
Especially the young lady who helped me tremendously. My experience was 100%.
Thank you! 
Testimonial - Excellent service at MSK Podiatry, Ninewells Hospital, Dundee. Was
seen by [staff], a very caring and competent professional who listened to me,
explained what the problem was and what exercises to do to improve my condition.
NHS at its best. Thank you. 
Page 230 of 396

Page 231

51 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025 
Patient Initiated Returns (PIR) - Continual increase in demand for podiatry care and
the increasing burden of wounds necessitates the transformation of parts of our service
to help us tackle the challenges we face and maintain a service fit for future demand.
The service sees the introduction of PIR as a positive change. It empowers patients
with the knowledge to take control of their own care based on their individual needs at
any given time. PIR gives patients control over their follow-up care allowing them to be
seen quickly when required, while avoiding the inconvenience of appointments of low
clinical value, for example, a patient attending a routine appointment as part of their
care plan for us to check or monitor, despite nothing in their foot health having changed
since their last visit. For patients this means more flexibility around when they access
care. For clinicians, it means fewer appointments of low clinical value freeing up time to
support the patients most in need, and decreases cost associated with these routine or
Case Study - The introduction of Prescription Only Medicines Supply
(POM-S)
NHS Tayside Podiatry Service is looking to introduce a First Contact Nail
Surgery Service to improve the patient pathway/journey for people with painful
nail conditions whilst supporting the antimicrobial agenda.
Podiatrists registered with the Health and Care Professions Council who have
a POM-S annotation on their registration can lawfully supply and administer
certain medications within the course of their professional practice.
A recent audit on nail surgery pathways highlighted a variation in practice
within Primary Care in the use of antibiotic therapy prior to referral to podiatry
for acute nail conditions. It was noted that many patients had received multiple
courses of antibiotics before a referral to podiatry was made. This practice
does not comply with antimicrobial stewardship guidance and has a
detrimental impact on; the patient experience/journey and capacity within
General Practice.
Continued - The service invokes the use of the podiatry POM-S annotation for
podiatrist working within NHS Tayside. To comply with local NHS governance
arrangements the service drafted NHS Tayside Podiatry and Prescription Only
Medicine (POM-S) Exemptions Guidance. This guidance was required to be
presented to both the NHS Tayside Medicines Policy Group and the
Antimicrobial Stewardship Group. In addition to support the continued
professional education of staff and to maintain safe and effective practice, a
POM-S LearnPro has been introduced. The guidance document was supported
and approved by both the above groups. The service now has governance in
place to support the use of POM-S annotation allowing further improvement as
part of a test of change to address above situation.
Page 231 of 396

Page 232

52 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
low value follow-ups, thereby supporting the long-term sustainability of the service. It
should however be recognised that this model will not be suitable for our entire patient
cohort and further governance and guidance around application of PIR is in the process
of being developed.
Podiatry Led Vascular Assessment Service - Evidence shows that Podiatrists are
clinically effective in reducing health and social care cost burdens by improving early
diagnosis of peripheral arterial disease (PAD). NHS Tayside Podiatry has commenced a
two-year project to support the early identification, diagnosis and management of
people with symptoms of PAD; with a view to improve health and reduce the risk of
associated heart attacks, strokes and lower limb amputations. It is anticipated that
providing vascular trained podiatrists to assess, diagnose and triage people with
suspected PAD, will see a reduction in the demand on other primary and secondary
care services in relation, not only to the PAD management, but also to wider cardio-
vascular health. Evidence shows that maximising on the skills of a community-based
vascular podiatrist also has the potential to reduce the future burden on social care
services.
Prison Healthcare
Prison Healthcare provides Primary and some Secondary Health Care Services to the
populations of HMP Perth (His Majesty’s Prison), HMP Castle Huntly and the HMP and
YOI (Young Offenders Institute) Bella (Dundee). The service operates seven days per
week (daytime hours only) and aims to deliver equitable provision of healthcare to that
delivered in the community. Out of hours care is provided by NHS Tayside, Out of Hours
Service and emergency care is via the Scottish Ambulance Service.
HMP Perth has a population of approximately 650 prisoners at any one time with an
annual turnover of approximately 3,500, with prisoners primarily being from Tayside and
Fife. HMP Castle Huntly is a national progression establishment, offering access to the
community through placements and home leave. It is now recognised as a single cell
site, with a design capacity of 184, however, an assessed capacity can be increased
220 where necessary. HMP and YOI Bella was initially designed for women from
Tayside and Fife, however the unit now provides accommodation for 16 women from
the East of Scotland. It provides secure living accommodation through independent
housing units, to support people to learn life skills, build independence, self-reliance
and resilience, before accessing the community. 
Prison Healthcare services span a number of specialties; Primary Care - GP and
Nurses, Clinical Pharmacy, Pharmacy Technician, Optician, Dentistry, Podiatry,
Psychology, Mental Health Team, Substance Use Team, Occupational Therapy, and
Physiotherapy, who deliver services such as management, administration and
distribution of medication (in possession and supervised medication), sexual health and
blood borne virus, enhanced care, first responder services for acutely unwell or injured
people. Everyone admitted to HMP Prison is assessed by a nurse on admission and by
a doctor within two weeks. Individuals transferred to HMP Castle Huntly or HMP Bella
(non-admitting prisons) receive a transfer assessment by a nurse within 72 hours of
arrival. 
Page 232 of 396

Page 233

53 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Successes over the past year:
• Routine GP waiting times are now three weeks. 
• Routine Mental Health Nurse Waiting Times are now four to six weeks.
• Mental Health Team Delivery of Safety and Stabilisation and Anxiety
Management Groups.
• Introduction of computer based psychological intervention for those with mild
to moderate mental health conditions.
• Focused MDT medicines management service improvements for safer
prescribing.
• Successfully recruited a full-time physiotherapist to deliver services across all
three establishments, including a pain management group.
• Pain Association Scotland delivered pain management sessions in HMP
Castle Huntly and HMP Bella.
• Introduction of diabetes and asthma long term condition clinics.
• Move to Advanced Nurse Practitioner and Specialist Pharmacist run clinics to
review all transfers into HMP Castle Huntly, freeing up GP time.
Our challenges over the past year have been the administration of medicines to
approximately 250 patients each morning and 150 each evening. There is no
substantive GP workforce, we have nursing and pharmacy vacancies and a growing
demand for Psychology and Physiotherapy Services.
From 1 March 2024 to 28 February 2025, the service received 397 complaints. Stage 1
complaints accounted for 55% (n=217) and stage 2 complaints were 180. 12% of
complaints were fully upheld, 61% were not upheld and 23% were partially upheld. The
top three complaint themes were medication related (40%), disagreement with
treatment/care plan (37%) and waiting times (17%). 
The service is progressing work with the ‘What Matters to You’ team to implement the,
What Matters to You principles, and a culture of kindness, jointly with the Scottish
Prison Service, exploring ‘What Matters to You’ with patients across the three prison
establishments. 
Joint Trauma Informed Leadership Training with the Scottish Prison Service at HMP
Castle Huntly, with the vision of expanding and including HMP Perth, to support working
towards trauma informed prisons is being progressed, and we are expanding the
workforce, introducing new roles for Advanced Nurse Practitioners across both Primary
Care and Substance Misuse, Clinical Educator and Senior Pharmacy Technician.
We are strengthening nurse leadership at HMP Castle Huntly and HMP and YOI Bella.
We are promoting staff wellbeing and embedding SAFECARE to meet the requirements
of the Healthcare Staffing Act. We are also strengthening care and professional
governance and recommencing service user forums to aid service improvements. We
Page 233 of 396

Page 234

54 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
are raising the profile of prison healthcare and are continuing to work with the National
Prison Healthcare Network.
Hillcrest Futures has employed a peer worker based within HMP Perth Prison who
provides activities to deliver harm reduction and peer led recovery. This is delivered in
partnership with the Scottish Prison Service.
Type of Group Number of
Groups
Total
Attendees
SMART Recovery 49 483
Relapse Prevention/Mindfulness 40 312
Recovery Café 64 501
Recovery Discussion/Book Group 43 289
Recovery Coaching 39 302
Art Group 48 293
Yoga 38 478
TOTAL 321 2,658 
Prison One to One Total Number of People
Harm Reduction 66
Mental Health/Wellbeing 42
Advice and Information 72
Recovery Support 81
Family Interventions 40
TOTAL 301 
Workforce
Perth and Kinross is dedicated to creating a learning culture that respects, equips, and
supports our workforce. Through collaborative efforts, creative approaches, and a
commitment to continuous improvement, we strive to make a tangible impact on our
workforce and the communities we serve. Our learning and development initiatives from
April 2024 to March 2025 reflect our values of integrity, compassion, and ambition,
driving us towards a sustainable and inclusive future.
The HSCP developed and implemented a comprehensive 3-Year Workforce Plan
(2022–2025), structured around the Five Pillars of Workforce: Plan, Attract, Train,
Employ and Nurture. This strategic framework aims to ensure a sustainable, skilled,
and responsive workforce capable of meeting current and future demands.
Governance and Structure - A Workforce Programme Board has been established
and is supported by four subgroups for Education and Development, Safer Staffing,
Testimonial: The Recovery Hub has been brilliant, I have learned so much, and I
will not be using drugs again. It’s hard sometimes when you are on your on in your
cell, but I am determined to stay clean as drugs have really messed up my life. 
Testimonial: I can’t believe that you can do all the things in the Recovery Hub
when you are in Prison. I never thought I would do yoga, but it has been really
good, and I also use the breathing techniques then I am feeling stressed, I can’t
recommend the Hub enough.
Page 234 of 396

Page 235

55 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Recruitment/Retention and Attraction, and Staff Health and Wellbeing. A Workforce
Planning Programme Manager was appointed in 2024 to drive delivery across services.
Legislative Compliance - The Health and Care (Staffing) (Scotland) Act 2019
mandates annual use of staffing level tools and the Common Staffing Methodology. A
pan-Tayside schedule and local training supports compliance.
Workforce Planning and Integration - Locality Integrated Teams enhance multi-
disciplinary collaboration and reduce duplication. The Six Steps Workforce Planning
Methodology is used to ensure consistency and responsiveness, and this is being rolled
out across each locality.
Progress Across the Five Pillars
Plan - Systems for real-time staffing data, risk escalation, and workforce analytics are
being developed and a pan-Tayside data group has supported evidence-based
planning.
Attract - Recruitment campaigns, youth engagement, and international recruitment (for
example, six staff from the Philippines) are progressing. The pilot participation in the
Newly Qualified Social Worker Supported Year Framework has doubled.
Train - Expansion of foundation, modern, and graduate apprenticeships. Development
of Band 4 Assistant Practitioners and Advanced Nurse Practitioners (ANPs) to address
skill gaps. Succession planning workshops and competency frameworks are being
implemented.
Employ - New employment models and career pathways have been explored and E-
rostering and SafeCare systems have been rolled out to support safe staffing.
Nurture - Initiatives like “What Matters to You” and Leading Excellence in Care promote
staff wellbeing and engagement. Annual appraisals, clinical supervision, and restorative
practices are emphasised.
Social care and nursing vacancies have decreased acceptably. Unmet Care at Home
hours reduced from 1,500 to 1,000 per week. Persistent challenges remain in
recruitment, especially in Occupational Therapy and AHP roles. Significant strides have
been made in workforce development, integration, and retention. Continued focus on
the Five Pillars and collaborative governance is essential to meet strategic goals and
ensure high-quality care delivery across Perth and Kinross.
Learning and Development
We are committed to our ambition of being a learning organisation and this underpins
the approach to workforce development, recognising that individuals bring unique skills,
qualities, and attributes. Guided by the values of integrity and compassion, the aim is to
create the conditions where both the workforce and communities can learn, grow, and
flourish. A diverse range of learning opportunities is offered to our workforce which are
aligned to statutory requirements and developmental needs, supporting personal,
professional, team, and partnership growth.
Page 235 of 396

Page 236

56 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Listening to the workforce and our communities is central to shaping learning
experiences. Insights from both data and lived experience inform the co-design of
inclusive, innovative learning that respects individual learning styles and equips people
to collaborate and deliver care with empathy and confidence.
Ongoing engagement has helped identify learning needs and shape targeted
development opportunities. These include accredited qualifications, personal and team
development, peer learning forums, and improvement and innovation sessions. The
learning culture aims to build knowledge and skills while unlocking the potential within
individuals to deliver personalised, compassionate support.
Strategic learning and development plans are informed by workforce feedback, service
provider input, and local and national priorities. The current ‘Learning and Development
Plan on a Page’ includes areas such as Practice Learning, the Newly Qualified Social
Worker Supported Year, SVQs, Trauma-Informed Practice, general development, Living
Well care, and Manual Handling. These plans support continuous professional
development, compliance with legislation, and alignment with national policy.
Sustained financial investment reflects the recognition that learning is central to
workforce wellbeing, productivity, recruitment, retention, and service performance.
Despite financial pressures, efforts continue to secure additional funding to sustain and
enhance learning opportunities.
Learning events, workshops, and development days have been positively received, with
feedback highlighting their practical relevance and impact on service delivery. The
Learning and Development team works collaboratively across the Council, Health and
Social Care Partnership, NHS Tayside, multi-agency partners, and the public to
maximise capacity and impact. A skill-mix approach supports co-ordination and delivery,
even amid staffing changes.
Progress against the Strategic Plan
We continue to work in partnership with employers across statutory, third and
independent sectors to attract and retain the best candidates for vacant roles. To create
a culture of continuous improvement and development, a ‘grow our own’ approach, we
continue to develop career pathways and succession planning mechanisms.
We continue to engage with local Higher Education institutions, Practice Professional
Development, NHS Education for Scotland and the Scottish Social Services Council.
This is to ensure our staff are well informed and that we have a comprehensive local,
regional and national approach to training at all levels.
Our ‘What matters to you’ approach to staff engagement supports us to listen to service
user and staff concerns and provide them with support and mitigate issues which might
adversely impact work experiences and retention at an early stage. We promote a
culture of continuous learning and development in terms of personal skills development
and new ways of working.
We are undertaking preparatory work for the introduction of real-time staffing data
collection, improved risk escalation processes and improved risk mitigation across the
Page 236 of 396

Page 237

57 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
partnership and key stakeholder organisations. This is to provide staff with a continually
improving and safe working environment, promoting the health and wellbeing of staff.
To ensure we treat staff fairly and consistently with dignity and respect in an
environment where diversity is valued, we have designed mechanisms to address
cultural barriers and prevent discrimination toward ethnic minority workers. These
mechanisms are equally accessible for all groups, irrespective of sex, disability or any
other protected characteristic. Leaders are expected to address organisational cultures
and develop a culture where concerns can be raised freely and there is confidence that
appropriate action will follow. Leaders should model the behaviours they expect of
others and make diversity and inclusion a priority.
To ensure that our area is an attractive and forward-thinking place to work, we promote
and develop new roles, such as Advanced Practice roles and those for Band 4
Healthcare Support Workers. We continue to work with key stakeholders to engage with
young people in schools and youth groups as an Employer of Choice, and we explore
the potential of international recruitment programmes.
We are developing current and future leaders by supporting the implementation of
Excellence in Care, and Leading Excellence in Care frameworks across the
Partnership. We are reviewing and developing measures to support the retention of
experienced staff in our services and continuing to work in partnership with employers
across statutory, third and independent sectors to attract and retain the best candidates
for vacant roles.
We value the role of each profession, community and organisation we work with, and to
understand what each partner brings, we review recruitment and retention pathways
and continue to explore and develop new models of employment into health and social
care roles. We work with partners and key stakeholders to increase the number of
sustainable employment programmes we participate in, including foundation, modern
and graduate apprenticeships, ‘Earn as you learn’ and the Princes Trust.
We continue to work in partnership with employers across statutory, third and
independent sectors to attract and retain the best candidates for vacant roles, aligning
all partners to locality integrated structures.
We are further developing relationships with NHS and third sector partners to allow
more people to be signposted to community services, by promoting a culture of
continuous learning and development in terms of personal skills development and new
ways of working. We have begun the process of reviewing our statutory responsibilities
in collaboration with our partners in both General Practice and the third sector, with the
aim of providing an integrated, whole system service. This will provide an opportunity to
explore alternative roles and ways of working; these will support mutual development
and creativity across the service, and create opportunities to recruit, retain and develop
our workforce within the framework of an integrated care model.
Our work to ensure all partners understand what is available within our localities
continues by developing and implementing systems and processes to gather and report
on workforce data and do preparatory work for the introduction of real-time staffing data
Page 237 of 396

Page 238

58 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
collection, improved risk escalation processes and risk mitigation in the Partnership and
key stakeholder organisations. Our career development and succession planning
processes reflect our commitment to the provision of integrated health and social care
services including for our specialist services. We review skillsets, roles and remits in the
framework of ‘right staff, right skills, right place, right time’.
Independent Inspection
During the period April 2024 to March 2025, the inspection report regarding the
inspection of HMP Bella in March 2024 was published. There were also visits by the
Mental Welfare Commission to our three inpatient psychiatry of old age, mental health
wards at Murray Royal Hospital. The Care Inspectorate has also carried out a
programme of risk based inspections to commissioned Care Homes and Care at Home
services.
HM Inspectorate of Prisons for Scotland inspected HMP Bella in March 2024. The Bella
Centre became operational in 2022 and houses low supervision women and young
people. Located in the Hilltown area of Dundee, the centre's accommodation consists of
three ‘shared houses' with capacity for 16 individuals.
Women are supported to live independently in accommodation based on a ‘shared
house’ principle to develop a range of independent living skills, which are reflective of
real life.
The overall rating for Health and Wellbeing with the establishment was Satisfactory.
There were eleven examples of good practice highlighted and four recommendations
for improvement.
The good practice highlighted was:
1. Occupational therapy familiarisation visits were arranged for patients to support
the transfer to Bella and ensure a smooth transition for patients.
2. Accessible information was provided to patients on arrival to Bella, including a
healthcare information booklet.
3. Bella benefits from the input of the occupational therapy service that provided a
wide range of therapeutic supports for patients.
4. Naloxone kits and training were available to patients including access to a
service that delivers naloxone kits to the patient’s home address in preparation
for home leave and liberation.
5. Processes were in place to obtain feedback from patients to help inform service
improvements.
6. Routine appointments and dental treatments would be offered to all people at
Bella.
Page 238 of 396

Page 239

59 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
7. People who had dental treatments in progress on liberation would have their
details passed to their local public or community dental services to ensure their
treatment could continue.
8. The pharmacy technicians were aware of who to contact when the pharmacist
was absent.
9. A process was in place to review a person’s medicine Kardex’s before they were
transferred to Bella. This allowed medicines to be reconciled, the Kardex to be
rewritten and ensured a supply of medication was available when the person
arrived at the Bella.
10. A proactive approach to in-possession medication at the Bella was described.
This meant that most medications including Schedule 3 or 4 controlled drugs
were in-possession. This approach encourages people to manage their own
medication in preparation for liberation. 
11. A risk-based approach based on the vulnerability of the person was taken to
guide the frequency of dispensing of the month’s supply of medication for those
patients being liberated or going on home leave.
The recommendations were in relation to:
1. NHS Tayside/HSCP should ensure that complaint forms are readily available to
ensure all patients can provide feedback, raise concerns and make a complaint.
2. NHS Tayside/HSCP should ensure referral forms are available in picture format
and in the most common languages spoken at Bella. 
3. NHS Tayside/HSCP should ensure that self-referral forms are made available for
all patients to access.
4. NHS Tayside/HSCP should ensure that checks on emergency equipment are
carried out and consistently recorded to ensure that all equipment is within date
and ready for use.
The Prison Healthcare service has an improvement plan in place to progress the
recommendations identified, and all recommendations are either complete or
progressing to completion.
Mental Welfare Commission for Scotland 
Visit to Leven Ward at Murray Royal Hospital, May 2024
Leven is a 14-bedded, mixed-sex, functional admission ward for older adults, typically
over the age of 65. On the day of the visit, there were 14 people on the ward and no
vacant beds. 
The commission made three recommendations as a result of the visit:
1. Managers should ensure that individuals and/or relatives are involved in
developing care plans where possible. Their participation should be documented
Page 239 of 396

Page 240

60 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
in care records, and they should be offered a copy of care plans. If individuals
choose not to or cannot be involved, this should be recorded. 
2. Managers should ensure that where a welfare proxy is in place for an individual,
and they have powers to decide about the individual’s treatment, the proxy
should be consulted and consent sought. A section 47 certificate should record
this consultation. 
3. Managers should ensure the ‘NHS Tayside locked door in mental health settings’
protocol is explained to individuals who are admitted informally to the ward and
that they are also informed of the procedure for accessing and leaving the ward
when the door is locked. These discussions should be recorded in the care
records.
Visit to Garry and Tummel Wards at Murray Royal Hospital, July 2024
Garry and Tummel Wards are both 12-bedded, mixed-sex wards that provide
assessment and treatment for older adults with dementia, based in Murray Royal
Hospital.
The commission made two recommendations as a result of the visit:
1. Managers should ensure nursing staff document clinical descriptions of an
individual’s presentation in care records. 
2. Managers for Tummel Ward should ensure the activities offered are documented
in the individual’s case notes and whether they chose to participate or not.
Care Inspectorate Inspections 
During the period 1 April 2024 to 31 March 2025, there were a total of 60 inspections;
23 to Care Homes, 25 to Supported Accommodation and 12 to Care at Home Services.
This compares to 39 total inspections held during the 2023-2024 year.
The graph shows the results of the Inspections and the overall grades. 
0% 20% 40% 60% 80% 100%
How well do we support
peoples wellbeing
How good is your
leadership
How good is your staff
team
How good is your
setting
How good is care and
support planned
1 - Unsatisfactory 2 - Weak 3 - Adequate 4 - Good 5 - Very Good 6 - Excellent
Page 240 of 396

Page 241

61 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
There were no unsatisfactory ratings given during the year, and eight weak ratings
given. This compares to no unsatisfactory ratings and one weak rating given during the
2023-2024 year. The findings are considered by the Care Home Oversight Group and
inform ongoing support and improvement activity.
Arrangements for Clinical and Care Governance 
Assurance and Reporting
The HSCP Care and Professional Governance Forum (CPGF) has responsibility for
ensuring appropriate scrutiny, assurance and advice within the HSCP, and during 2024-
2025 was co-chaired by Perth and Kinross Council’s Chief Social Work Officer and
HSCP Clinical Director.
The CPGF receives assurance reporting from all localities and services within the
partnership, and all have provided an annual report providing details and assurances
regarding the provision of safe, effective and person-centred services, and any ongoing
improvement. 
Each locality has in place a Clinical, Care and Professional Governance Group, all of
which are now firmly established. These groups have representation across both Health
and Social Care, and provide an opportunity for a focus on improvement, shared
learning as well as ensuring effective clinical and care governance processes across
the locality.
Finance
Financial Resources Available to the IJB 2024-2025
The IJB is responsible for the planning and oversight of a broad range of health and
adult social care services for the people of Perth and Kinross. These services are
provided by Perth and Kinross Council and NHS Tayside via Perth and Kinross Health
and Social Care Partnership. This is funded through budgets delegated from Perth and
Kinross Council and NHS Tayside. The resources available to the IJB in 2024-2025,
totalled £316.290m. 
The following charts provide a breakdown of where these resources came from, and
how it was allocated.
Included within the Resources Available to the IJB is ‘Large Hospital Services’ (Set
Aside) totalling £28.180m. This resource is in respect of those functions carried out
within a large hospital setting and operationally managed by NHS Tayside but for which
planning is the responsibility of the IJB.
Page 241 of 396

Page 242

62 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025 
Financial Performance
The Financial Plan, approved by the IJB in March 2024, projected a break-even position
across Health and Social Care after the application of general reserves. The IJB’s
financial performance compared to the Financial Plan for 2024-2025 is summarised in
the table below. 
Finance updates have been presented to the IJB throughout 2024-2025, reporting on
the projected in year position. The main movements from plan relate to an increased
provision of Care at Home and Care Home placements, driven by demographic growth
and rising care needs, resulting in higher costs. The Care at Home Transformation
Programme reduced unmet need and delayed discharges but also added financial
pressure. Continued reliance on supplementary staffing in community hospitals and
inpatient wards, due to sickness absence and patient acuity, further contributed to the
overspend. 
2024-2025
Financial Plan
Position
Over/(Under)                            
£m
2024-2025 Year-End
Out-Turn
Over/(Under)                                
£m
Movement from Plan
Over/(Under)                                   
£m
Health 1.042 3.585 2.543
Social Care 2.086 5.493 3.407
Financial
Recovery Actions - (1.305) (1.305)
Sub-Total 3.128 7.773 4.645
PKIJB Approved
Earmarked
Reserves
(1.684) (1.684) -
PKIJB General
Reserve (1.444) (4.485) (3.041)
Total - 1.604 1.604
Contribution to
Inpatient Mental
Health
Overspend
- 1.325 1.325
Total - 2.929 2.929
Page 242 of 396

Page 243

63 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Within Adult Services, higher than planned expenditure reflected increasing volume and
greater complexity of needs throughout the year.
Prescribing volumes increased above anticipated levels, leading to an overspend. While
local savings initiatives progressed well, limited delivery on national initiatives added
pressure. Drug costs and prescribing remain a source of pressure, with measures to
address the position included within the 2025-2026 budget.
Earmarked reserves have also been used to provide additional capacity and support
service resilience.
Budget has not been delegated to the Perth and Kinross IJB for Inpatient Mental Health
in 2024-2025. However, given the IJB have strategic planning responsibility for the
services, there is a requirement to show a delegated budget and spend position within
the annual accounts. On 19 March 2025, the IJB authorised the Chief Finance Officer
and the Chief Officer to finalise an agreement on contributions towards the 2024-2025
Inpatient Mental Health Service overspend. A total of £1.325m in relation to Inpatient
Mental Health has been reflected within the 2024-2025 position.
Financial Plan
In March 2025, the IJB approved a budget for 2025-2026 and provisional budgets for
2026-2027 and 2027-2028. Increased funding from both Perth and Kinross Council and
NHS Tayside, combined with an ambitious savings plan, allowed for the approval of a
balanced budget for 2025-2026. The budget is based on several assumptions including
projected levels of need, costs, transformation, pay and funding availability. It also
builds on previous efforts to enhance efficiency and make best use of resources. The
provisional budgets for 2026-2027 and 2027-2028, developed using the same
assumptions, identified a considerable funding gap. 
This shortfall is a result of increasing pressures across all care groups including drug
costs and prescribing. To achieve financial sustainability in future years, the IJB will
need to consider additional funding solutions and identify opportunities to reduce overall
expenditure, while acknowledging the challenge of doing so with minimal detrimental
impact on the strategic plan and to the population’s health and care needs. Addressing
these pressures will require further funding, strengthened collaborative working,
strategic planning, robust financial management, a reserves policy and effective
workforce planning. 
Best Value 
Best Value is about creating an effective organisational context from which public
bodies can deliver key outcomes. The following building blocks ensure we are
organised to deliver good outcomes, by ensuring delivery in a manner which is:
economic, efficient, sustainable, and supportive of continuous improvement.
Best Value Self-Assessment Update - Following the Best Value self-assessment
completed in 2024, an improvement plan was developed to address the 11 criteria
identified for action. This plan was monitored and reported to the Audit and
Performance Committee throughout the 2024-2025 financial year. The full and final
Page 243 of 396

Page 244

64 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
action plan was presented to the Audit and Performance Committee in June 2025,
confirming that all 11 actions have now been completed. This marks the successful
conclusion of the improvement process and demonstrates the IJB’s continued
commitment to good governance, effective resource management, and continuous
improvement across all seven Best Value themes.
To maintain this momentum, an annual rotational self-assessment programme will be
introduced, focusing on one Best Value theme each year. This will support Perth and
Kinross IJB in ensuring that good governance and effective management of resources
remain in place to deliver the best possible outcomes for the people of Perth and
Kinross.
Governance and Accountability
The IJB undertakes an annual review of its governance arrangements and is able to
demonstrate structures, policies and leadership behaviours which demonstrate good
standards of governance and accountability. No significant decisions have been made
outside of the scope of the strategic plan in the reporting year.
Use of Resources
The IJB is supported by a robust Financial Planning process which forms the basis for
budget agreement each year with NHS Tayside and Perth and Kinross Council.
Performance against the Financial Plan is reported to the IJB on a regular basis during
the year. Finance update reports have been presented to the IJB throughout 2024-
2025, reporting on the projected financial position. The IJB’s three-year financial
planning process is directly linked to the development of strategic plans, ensuring
resources are continuously prioritised to best meet the needs to the people of Perth and
Kinross.
Key Contact
For further information on any area of this report please contact: Chris Jolly, Service
Manager (Business Planning and Performance), or Claire McCarthy, Team Leader
(Performance Management and Reporting) at tay.pkijbbusinesssupport@nhs.scot.
Page 244 of 396

Page 245

65 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Appendix
Appendix 1.1: Perth and Kinross HSCP Service Breakdown 
Page 245 of 396

Page 246

66 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Appendix 2.1: National Core Suite Indicator 1 to 9, 5 year comparison
Ref Indicator 2019-
2020
2021-
2022
2023-2024
Latest
data
NI 1 Percentage of adults able to look after their health very well or quite well  94% 94% 94%
NI 2 Percentage of adults supported at home who agree that they are supported to live as
independently as possible  82% 80% 74%
NI 3 Percentage of adults supported at home who agree that they had a say in how their help,
care or support was provided  77% 74% 68%
NI 4 Percentage of adults supported at home who agree that their health and social care
services seemed to be well co-ordinated  73% 65% 57%
NI 5 Percentage of adults receiving any care or support who rate it as excellent or good  83% 79% 70%
NI 6 Percentage of people with positive experience of care at their GP practice  86% 74% 76%
NI 7 Percentage of adults supported at home who agree that their services and support had
an impact in improving or maintaining their quality of life  80% 76% 76%
NI 8 Percentage of carers who feel supported to continue in their caring role  37% 33% 32%
NI 9 Percentage of adults supported at home who agree they felt safe  84% 79% 77%
Notes
1. Data comes from the national Health and Care Experience Survey which is undertaken two yearly. 
Page 246 of 396

Page 247

67 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Appendix 2.1: (cont’d) National Core Suite Indicator 11 to 19, 5 year comparison
Ref Indicator 2019-
2020
2020-
2021
2021-
2022
2022-
2023
2023-
2024
2024-
2025
NI 11 Premature Mortality rate per 100,000 persons (calendar year)  333 366 358.4 382.1 344 n/a
NI 12 Emergency admissions rate for adults (18+) (per 100,000
population)  11,486 10,582 11,318 12,779 14,049 14,394
NI 13 Emergency bed day rate for adults (18+) (per 100,000 population)  109,715 94,638 112,891 126,480 119,654 110,545
NI 14 Emergency readmissions to hospital within 28 days of discharge
(rate per 1,000 discharges 18+)  116 141 129 137 153 153
NI 15 Proportion of last 6 months of life spent at home or in a community
setting  90% 90% 91% 89% 89% 90%
NI 16 Falls rate per 1000 population aged 65+ (falls which result in a
hospital admission)  22 24 23 28 26 25
NI 17 Proportion of care services graded "good" or better in Care
Inspectorate inspections  86% 89% 77% 73% 71% 71%
NI 18 Percentage of adults with intensive care needs receiving care at
home  59% 60% 55% 67% 64% 64%
NI 19 Number of days people aged 75+ spend in hospital when they are
ready to be discharged per 1,000 population  502 197 594 912 645 654
Notes
1. Data for NIs is published via Public Health Scotland.
2. NI 11 - no data published for 2024-2025.
3. NIs 17 and 19 data covers 2024-2025, all others are for calendar year 2024 due to incomplete data for January to March 2025. 
Page 247 of 396

Page 248

68 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Appendix 3.1: Strategic Priorities Mapped to National Indicators and the
National Health and Wellbeing Outcomes
Strategic
Priority
National
Health
and
Wellbeing
Outcomes
Core Suite of
Integration
Indicators
Relevant Plans, Projects and
Strategies
Target
resources to
where people
and
communities
need help
most.
NHWO 4
NHWO 5
NHWO 6
NI 7, NI 8, NI 11, NI
12, NI 13, NI 16, NI
17, NI 19, NI 20
Older People Delivery Plan,
Carers Strategy, TEC Strategy,
Primary Care Strategy. Draft
Physical Disability and Sensory
Impairment Strategy,
Community Mental Health and
Wellbeing Strategy 2022-2025,
Learning Disability and Autism
Delivery Plan, Suicide
Prevention Plan, ADP Delivery
Plan.
Make it easier
for people to
understand
where and
how to access
services.
NHWO 1
NHWO 3
NHWO 4
NHWO 6
NI 1, NI 3, NI 4, NI 5,
NI 6, NI 7,
NI 8, NI 11, NI 12, NI
13, NI 14, NI 15, NI
16, NI 17, NI 19, NI
20
Draft Physical Disability and
Sensory Impairment Strategy,
Community Mental Health and
Wellbeing Strategy 2022-2025,
Learning Disability and Autism
Delivery Plan, Older People
Delivery Plan and Carers
Strategy.
Provide health
and social
care supports
close to home.
NHWO 2
NHWO 3
NHWO 4
NHWO 5
NHWO 6
NHWO 9
NI 2, NI 3, NI 4, NI 5,
NI 6, NI 7, NI 8, NI
11, NI 12, NI 13, NI
14, NI 15, NI 16, NI
17, NI 18, NI 19, NI
20
Community Mental Health and
Wellbeing Strategy 2022-2025,
Learning Disability and Autism
Delivery Plan, Older People
Delivery Plan and Carers
Strategy.
Work with
communities
to design the
health and
social care
supports they
need.
NHWO 1
NHWO 2
NHWO 3
NHWO 4
NHWO 6
NHWO 7
NHWO 9
NI 1, NI 2, NI 3, NI 4,
NI 5, NI 6, NI 7, NI 8,
NI 9, NI 11, NI 12, NI
13, NI 14, NI 15, NI
16, NI 17, NI 18, NI
19, NI 20
Older People Delivery Plan,
Carers Strategy, Primary Care
Strategy, Community Mental
Health and Wellbeing Strategy
2022-2025, TEC Action Plan,
Community Action Plans.
Improved
integrated
working.
NHWO 2
NHWO 3
NHWO 4
NHWO 6
NHWO 9
NI 2, NI 3, NI 4, NI 5,
NI 6, NI 7, NI 8, NI
12, NI 13, NI 14, NI
15,
NI 16, NI 17, NI 18,
NI 19, NI 20
Older People Delivery Plan,
Carers Strategy, TEC Strategy,
Primary Care Strategy, NHST
Integrated Clinical Strategy,
Community Action Plans,
Community Mental Health and
Wellbeing Strategy 2022-2025,
Learning Disability and Autism
Delivery Plan.
Page 248 of 396

Page 249

69 
Perth and Kinross Integration Joint Board 
Annual Performance Report 2024-2025
Strategic
Priority
National
Health
and
Wellbeing
Outcomes
Core Suite of
Integration
Indicators
Relevant Plans, Projects and
Strategies
Promote self-
management
and living well.
NHWO 1
NHWO 2
NHWO 4
NHWO 6
NHWO 7
NI 1, NI 2, NI 3, NI 7,
NI 8, NI 9, NI 11, NI
12, NI 13, NI 14, NI
15, NI 16, NI 17, NI
18, NI 19, NI 20
Older People Delivery Plan,
Carers Strategy, TEC Strategy,
Primary Care Strategy,
Community Action Plans,
Community Mental Health and
Wellbeing Strategy 2022-2025,
Learning Disability and Autism
Delivery Plan.
Value our
workforce,
support them
to keep well,
learn and
develop.
NHWO 3
NHWO 4
NHWO 8
NHWO 9
NI 3, NI 4, NI 5, NI 6,
NI 7, NI 10, NI 12, NI
13, NI 14, NI 15, NI
16, NI 17, NI 19, NI
20
Workforce Plan 2023-2026,
Celebrating
People Document.
To give us feedback
If you, a family member or someone you care for has recently used one of our health and
social care services, and would like to share your experience, please use the QR code or
visit Perth and Kinross Health and Social Care Partnership | Care Opinion. 
https://www.careopinion.org.uk/services/s37000023
How We Use Your Personal Information 
The information provided by you will be used by Perth and Kinross Council and NHS
Tayside to improve services. The information will not be disclosed to third parties except
as described below. The Council or NHS Tayside may check information provided by
you, or information about you provided by a third party, with other information held by
us. We may also get information from certain third parties or share your information with
them in order to verify its accuracy, prevent or detect crime, protect public funds or
where required by law. For further information, please see
www.pkc.gov.uk/dataprotection, email DataProtection@pkc.gov.uk or telephone
01738 477933.
If you or someone you know would like a copy of this document in another language or
format, (on occasion, only a summary of the document will be provided in translation),
this can be arranged by contacting the Customer Service Centre on 01738 475000. You
can also send us a text message on 07824 498145. All Council Services can offer a
telephone translation facility. BSL users can contact us via Contact Scotland BSL, the
online British Sign Language video relay interpreting service. Find out more on the
Contact Scotland BSL website https://contactscotland-bsl.org/.
Page 249 of 396

Page 250

Page 250 of 396

Page 251

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee: Perth and Kinross Council 
Date of Meeting: 29 October 2025 
Report Title: Demographic and Population Change: Impact on
Social Care 
Report Number: 25/278 
Report Authors: Jacquie Pepper, Director Integrated Health & Social
Care/Chief Officer and Scott Walker, Chief Finance
Officer 
Organisational Lead: Jacquie Pepper, Director Integrated Health & Social
Care/Chief Officer
___________________________________________________________________ 
1. Purpose 
1.1 Significant demographic and population changes in Perth and Kinross are
resulting in an associated increase in people with social care needs,
particularly in relation to older people and people with a learning or physical
disability.  The increase in the level of complexity and demand for social care
has been unprecedented within this financial year.  There is now a gap
between what is required to meet the needs of people eligible for social care
and the budget available to deliver this.   
1.2 This report provides the Council with a comprehensive overview of how
increasing demand and complexity, driven by a growing and ageing
population as well as rising numbers of people with complex needs, have
resulted in budget insufficiency for the Perth and Kinross Integration Joint
Board (IJB) within 2025/26. The report sets out the national context and key
drivers for these unparalleled pressures, including early data on current and
future demographic trends that will continue to impact demand for health and
social care services. 
1.3 The IJB has considered and agreed a financial recovery plan and work to
scope out the impact of potential changes to delivery.  This report seeks
financial support in-year from the Council to address the gap between
available funding and actual need. The Council, as a strategic partner in the
Integration Scheme, has a legal duty to provide social care to eligible
residents and must now consider how best to respond to these evolving
challenges.
8
Page 251 of 396

Page 252

2. Recommendations 
It is recommended that the Council: 
2.1 Notes the projected financial gap for integrated health and social care
services with, £4.430 million relating to social care provision; 
2.2 Notes the IJB’s approved financial recovery plan Part A which is assessed as
being deliverable by end March 2026; 
2.3 Notes the IJB’s approval to scope out actions set out in Part B of the financial
recovery plan which will require significant work to fully assess the impact
should these actions be implemented, and the requirement for consultation; 
2.4 Approves an additional allocation of up to £4.180 million from council’s
Uncommitted General Fund Balance in 2025/26 to meet existing costs
associated with high service demand and to complete the work outlined in
Parts A and B of the Financial Recovery Plan; 
2.5 Agrees to receive an update on progress at the meeting of Council proposed
on 14 January 2026 which follows the next meeting of the IJB on 17
December 2025; and 
2.6 Agrees to work collaboratively with the IJB, NHS Tayside and other strategic
partners on the revised population projections, published by National Records
of Scotland (NRS), and the implications for Perth & Kinross. 
3. Structure of Report 
This report is structured as follows: 
• Background & Context
• Current Financial Projections
• Financial Recovery
• Implications for Perth & Kinross Council
• Conclusion
• Impact & Value Assessment
• Appendices 
4. Background & Context 
Health and Social Care Integration in Scotland 
4.1 Health and Social Care Integration in Scotland was established under the
Public Bodies (Joint Working) (Scotland) Act 2014, which came into effect in
2016.  The legislation requires local authorities and NHS Boards to work
together to plan and deliver integrated health and social care services through
a partnership arrangement known as an Integration Joint Board (IJB). 
Page 252 of 396

Page 253

In Perth and Kinross, this means the Council and NHS Tayside jointly agree
the scope of an “Integration Scheme” each delegating the functions (as
prescribed by the legislation) and associated budgets to the IJB.  The IJB
directs the design and delivery of integrated services through its strategic plan
and allocates funding back to the partners, who are then responsible for the
operational delivery of the services through the Health and Social Care
Partnership (HSCP).  The detailed arrangements for how this partnership
operates, including governance, decision-making, and financial arrangements,
are set out in legislation and statutory guidance and further defined in the
Perth & Kinross Integration Scheme. 
Council Funding 
4.2 The Council’s Revenue Budget for 2025/26 (Report 25/36 refers)approved a
contribution to the IJB which included additional funding of £6.7 million to
protect and support the delivery of social care services, based on mid-level
demand assumptions.  In setting the Revenue Budget however, there was an
acknowledged risk that the higher-level assumptions could result in additional
costs of £5 million over and above the assumed mid-range figure. That risk
has now materialised.  The IJB’s financial reserves are already depleted
through efforts to manage and meet increasing complexity and demand
across adult social care services mainly in the post-pandemic period.  There
is now a requirement for additional financial support from the Council to
ensure the continued delivery of adult social work and social care services to
match the needs of the population.   
National and Local Pressures 
4.3 The primary challenge in social care funding in Perth & Kinross arises from
increasing demand for services, both in terms of the number of people
requiring care and support for daily living (reflecting our local demography)
and the increasing complexity of need in terms of the care and support that
individuals require for daily living. This includes personal care at home,
complex care packages for people with learning disabilities and long-term
mental health needs and residential care placements, all of which have
exceeded budget assumptions.  This is not solely due to overspending, but
the scale of the demand that has been realised is in line with high-level
assumptions previously identified. 
4.4 Perth & Kinross is not alone in experiencing significant financial pressures in
integrated health and social care. Reports from the Accounts Commission and
Audit Scotland highlight that many areas across Scotland are facing
increasingly challenging circumstances.  Many IJBs have been relying on
reserves in recent years to maintain essential services.  As a result, a
significant number of IJBs have now entirely depleted their general reserves.
In April 2025, the Chair of Health & Social Care Scotland formally notified the
Cabinet Secretary of an estimated national funding gap of £560 million and
emphasised that, without additional funding, it would not be possible to
sustain existing levels of care.  
Page 253 of 396

Page 254

The usual share of national allocations for health & social care in Perth &
Kinross is around 3% and if the IJB was in line with the national position it
could be facing a funding gap of approximately £15 million.  However, due to
the impact of local decision making, efficiency measures, and financial
management, the current projection for 2025/26 is equivalent to 1% of the
national shortfall. 
Demographic Trends and Demand 
4.5 Demographic trends are resulting in an increasing scale and complexity of the
needs of our older population and people with learning disability. These
demand pressures show no sign of abating.  The most recent population
projections from the National Records of Scotland (NRS) published on 30
September 2025 and based on the 2022 census, indicate a sharp rise in the
number of people aged 67–85 and 86+ in Perth and Kinross.  The scale and
complexity of need is already higher than previously anticipated and is
expected to remain elevated through to 2045. Notably Perth and Kinross is
experiencing a faster rate of growth in its older population compared to the
Scottish average. The number of residents over age 75 has already increased
by 10% over the past three years, rising to a 12% increase in 2026. 
4.6 The revised population projections are a significant cause for concern not only 
for the Council but also its partners, as older people typically require greater 
healthcare attention and long-term social care that becomes  more intensive
as a person ages. In addition, the number of people with a learning disability
requiring complex and costly packages of care and support throughout their
adult life is rising. There is also an imperative to secure the return of people
who have experienced long term hospital stays to the community in line with
the Coming Home ambitions. 
4.7 Early analysis of the updated population data over the next 20 years is 
shown in Tables 1 and 2 below.  Perth & Kinross is the only local authority
area in Tayside in which the population is growing at such a fast rate and at a
rate higher than Scotland as a whole. This will be an important factor for local
strategic and community planning and for partners and services that operate
across Tayside. 
Page 254 of 396

Page 255

Table 1. 
Population projections for Perth & Kinross, Tayside Local Authorities and Scotland
2022-2045 
Source: National Records of Scotland (Sept 2025) 
Table 2. 
Percentage population growth projection for Perth & Kinross by age group 2022-2045.
Changes in projections from 2018 to 2022.  
Source: National Records of Scotland (Sept 2025) 
5. Current Financial Position 
5.1 The recurring budget for Perth and Kinross IJB is £277.5 million, with £175.0 
million allocated for health and £102.5 million for adult social work and social
care. The £5.558 million projected gap equals 2% of the total delegated
budget. For social care, a projected gap of £4.430 million represents 4.3% of
its £102.5 million budget.
Page 255 of 396

Page 256

5.2 The Health and Social Care Partnership delivered £12 million in savings
between 2022 and 2025 and is projected to achieve an additional £2.5 million
by the end of March 2026. This has been achieved through a financial
strategy focusing on efficiency and redesign, including £1.1 million savings
since 2023/24 within central support and management functions. These
savings were achieved during a period of population growth and increasing
need and Audit Scotland noted in September 2025 that the IJB has made
significant progress towards recurring savings targets. 
5.3 Significant savings and efficiencies have already been delivered within social
care to meet additional population growth and increased demand and the
remaining options to further reduce expenditure are limited and extremely
challenging. Based on the most recent verified Local Financial Return (LFR)
for 2023/24, for the level of adult social care expenditure per 1,000 population,
Perth & Kinross ranks as the 29th lowest of the 32 local authorities in
Scotland.  Further demonstrating that, to date, the social care budget has
been managed efficiently and effectively; leaving the scope for achieving
further material savings without impacting on service delivery or worsening
outcomes for people who use services, very restricted. 
6. 2025/26 Financial Projections 
6.1 The IJB is currently forecasting a net gap of £5.558 million, with £4.430
million of this attributed to social care pressures. This financial position
reflects a combination of demand pressures and underlying structural budget
challenges. 
6.2 The most significant element of the financial pressure is the Care at Home
service, which accounts for £2.5 million of the projected gap. Current levels
of demand and assessed need has outpaced the assumptions used to set the
2025/26 budget, which were based on a mid-range scenario. The volume of
care hours commissioned has exceeded expectations, driven by: 
• Service demand has exceeded demographic projections which were
based on 2018 national data.
• An unanticipated surge in high levels of complex needs being assessed
to support older adults with complex needs.
• Increased acuity and frailty among service users, requiring more
intensive support. 
6.3 The factors underlying this are multifaceted, with primary drivers including a
growing and aging population. People are living longer, and this is
accompanied by more complex needs, as well as a significant surge in
pandemic-related demand (see Appendix 1: Chart 3 page 4). These trends,
combined with the impact of interruptions in addressing care requirements
during periods of elevated unmet need, contribute to the current challenges. 
Page 256 of 396

Page 257

6.4 The HSCP restructured in 2024 with the aim of enhancing and building further
on integrated working, localities and a whole-system focus.  The HSCP has
also driven forward service redesign and transformation to deliver the IJB’s
Strategic Plan 2024-2027.  Transformation is focused on shifting the balance
of care towards prevention; addressing needs arising from demographic
change namely the ageing population and prevalence of dementia; increasing
equality of access and addressing unmet need in the community. The most
recent performance report (Appendix 1) shows how all of this is leading to
improved outcomes over time. Demand for health and social care services is
high and performance in delivering against that demand is good with people
spending less time in hospital and access to services is quicker from the point
of assessed need. Areas for improvement are informing the programme of
service development and transformation. 
6.5 Following recovery from the Covid19 Pandemic in 2022/23, strategic planning
by the IJB has delivered positive and improving health and wellbeing
outcomes for the population of Perth & Kinross (see Appendix 1).  External
auditors concluded in September 2025 that the IJB continues to perform well
against its performance comparators and the Scottish average.  This
performance directly supports the Council’s vision, corporate priorities and is
contributing positively to prevention, early intervention and stemming failure
demand across multiple points in the health and social care system. 
Appendix 1 is the most recent IJB performance report and shows very positive
trends over time that without support could be interrupted or reversed causing
cumulative impact and significantly higher levels of need, crisis care and cost. 
6.6 The HSCP has managed higher levels of demand through a 3-year workforce
plan which seeks to deploy expertise in key service areas.  This is supporting
positive recruitment and retention resulting in a low vacancy rate in social
care.  The health and social care workforce is to be commended for their
central role in addressing higher levels of need and demand and in achieving
the current levels of performance through service redesign and without
significant increases in staffing.  Research shows that high demand in health
and social care creates a significant negative impact on staffing, leading
to increased vacancies, staff burnout, and decreased quality of care.  Looking
after the health and social care workforce in the current climate is a key
priority as quality health and care delivery are directly linked to appropriate
staffing levels and a workforce whose wellbeing is actively promoted. The
health and social care workforce remain vulnerable to the negative impacts,
and this will need to be a significant factor in the scoping and assessment for
any changes in the way in which services are delivered and configured. 
6.7 Other areas contributing to the financial challenge include: 
• Learning Disabilities and Mental Health Placements: Costs have
risen by £1.0 million due to higher placement needs and increased
demand. 
Page 257 of 396

Page 258

• Community Packages of Care: An additional £0.6 million is required to
address the growing complexity of care packages for people whose
needs cannot be met easily within the current range of services, further
highlighting the shortfall between available funding and the cost of
meeting population needs. 
Health System Pressures 
6.8 While the majority of the financial challenge is in social care, health-related
pressures have also emerged which reflect wider system challenges. These
include: 
• Staffing costs linked to recruitment challenges and resilience in the
workforce.
• Bed capacity constraints and the requirement to carry unfunded inpatient
beds into 2025/26. 
7. Financial Recovery 
7.1 To address the in-year financial pressures, the Chief Officer and the Chief
Finance Officer of the Integration Joint Board presented a Financial Recovery
Plan to the Board on 8 October 2025 comprising immediate in-year actions to
reduce costs and a range of medium to longer term measures to be scoped
out.   
7.2 The financial recovery plan needs to strike a balance of reducing spend
without compromising the legal requirement to deliver safe and effective care
and support for vulnerable adults.  It is for this reason that the recovery plan is
in two parts: 
• Part A is focused on areas where the Health and Social Care
Partnership, with professional advice, considers it can further reduce
spending.  This includes measures to further strengthen existing
vacancy management, repurposing earmarked funds, reducing
supplementary staffing costs, and introducing elevated levels of scrutiny
and approval for all spending.   
• Part B sets out more strategic options which include reviewing
commissioning models and eligibility criteria.  Most of these long-term
measures will require comprehensive impact assessments, and the
completion of the necessary consultations required to deliver major
service change.   
7.3 It is important to be clear that the only remaining way to further materially
reduce expenditure this year is through the actions set out in Part B of the
Financial Recovery Plan. All other efficiency measures and service
improvements of any material financial value have either already been
delivered, identified, or are in the process of being implemented. 
Page 258 of 396

Page 259

7.4 The actions in Part B are not being proposed by choice but by necessity, as 
there are no alternative options capable of closing the current financial gap. If 
the position was to be considered on financial grounds alone, expenditure 
could be reduced rapidly and significantly. However, doing so without fully 
understanding the impact on service users, carers, staff, the social care
market and providers; third sector, and wider system performance would carry
substantial risk. For these reasons, in-year funding support is being sought to
allow the required impact assessments and engagement work to be
completed before any such measures are implemented.  Without extra
funding, the IJB must revise its strategic plan which will inevitably lead to
service reductions which will have a negative impact on the experiences and
outcomes for vulnerable people and on whole system performance. 
7.5 The Scottish Government’s Operational Improvement Plan has provided
£6.143 million to NHS Tayside of which £1.543 million is targeted at services
provided by the HSCP and benefitting the population of Perth & Kinross. This
funding is aimed at reducing immediate pressures across the NHS, shifting
the balance of care from acute to the community and using digital and
technological innovation to improve access to care.  This investment was
intended to be recurring, but this is conditional on improving and maintaining
whole-system performance including the current levels of flow through
hospital into the community (Appendix 1: Charts 6-13 on pages 6-9). 
7.6 The IJB’s request for additional in-year funding from the Council will provide
sufficient time to fully assess the potential impact across the whole-system of
health and care and to enable careful implementation of complex decisions
and financial recovery measures set out in Part B (see sections 7.10 and
7.11).  If approved, this will give officers time to comprehensively assess the
impact of these actions.   
Recovery Plan Measures 
7.7 The IJB considered a Financial Recovery Plan aimed at addressing the
financial challenges of both current and future financial years.  Specifically, a
two-part financial recovery plan has been developed. 
Part A – Immediate In-Year Actions 
7.8 These measures are designed to deliver £950,000 savings within the current
financial year, of which £250,000 are expected to deliver in social care. 
Month 5 Projected Position  
Health
£m
Social Care
£m
Total
£m
Projected 2025/26 Gap after
Reserves
1.128 4.430 5.558
Financial Recovery Part A (0.700) (0.250) (0.950)
Updated Projected 2025/26 Gap 0.428 4.180 4.608 
Page 259 of 396

Page 260

7.9 Part A actions are largely non-recurring and will not address structural budget
gaps and are already in progress or ready for implementation: 
• Vacancy Management 
o Non-frontline vacancies are being held or delayed.
o Workforce planning is being reviewed to align staffing levels with
service demand and budget constraints. 
• Repurposing Earmarked Funds
o Uncommitted reserves and earmarked funds redirected to reduce
the financial gap.
o This action is subject to approval from the Scottish Government
and is likely to require formal notification and consent. 
• Increased Scrutiny of Complex Care Requests
o New authorisation process for high-cost care packages.
o Multi-disciplinary panel review to ensure necessity, value for
money, and alignment with eligibility criteria. 
Part B – Strategic Options for Medium-Term Sustainability 
7.10 Part B proposals are more complex and require further development,
consultation, and comprehensive equalities and system impact assessment.
They aim to reshape service delivery and reduce recurring costs. Whilst
decisions pertaining to care must be made based on need rather than cost
this may involve tightening criteria for access to certain services, introducing
decision-making and authorisation levels and maximum funding thresholds in
certain areas.  Local Authorities in Scotland are responsible for eligibility
criteria to determine whether an individual will be able to access social care. 
This must be compatible with the National Eligibility Framework and any
changes to the current criteria will require Council approval prior to
implementation. 
7.11 Proposed actions include: 
• Review of Commissioning Models for Care at Home
• Exploring alternative models of service delivery
• Reviewing the provision of social care services in-year alongside a
comprehensive review of eligibility criteria.  This will include a
prioritisation framework to manage demand and limiting services to
those with the greatest need.
• Accelerate recommissioning of Service Level Agreements and contracts
alongside a review of the IJB’s Strategic Plan.
• Vacancy management to be further strengthened to include a freeze on
non-frontline posts. 
7.12 The IJB will receive comprehensive impact assessments on all the above
actions on 17 December 2025. This information will be shared with elected
members at the Council meeting on 14 January 2026 and will be available for
consideration as part of the 2026/27 Budget setting process.
Page 260 of 396

Page 261

7.13 In addition, the HSCP is reprofiling its Transformation Programmes. Existing
transformation initiatives are being reviewed to accelerate delivery and
maximise savings. This includes digital enablement, workforce redesign, and
integrated locality planning along with a requirement to align with the Scottish
Government’s Service Renewal Framework for Health & Social Care
published in June 2025. 
8. Implications for Perth and Kinross Council 
8.1 According to the Integration Scheme, if a recovery plan fails, IJB reserves are
used first.  The IJB has exhausted all remaining general reserves.  Therefore,
after Part A recovery actions, the remaining forecast gap based on
expenditure  to month 5, is £4.180m.  Should the Council approve the
additional payment up to £4.180m in year, and costs rise further, the IJB must
take further action to contain this. Should these efforts fail, any excess over
£4.180m in social care would have to be funded by the Council as part of the
annual accounts, in line with the Integration Scheme. 
8.2 It is proposed that the Council supports an allocation of up to £4.180m and
this will be met from Council general reserves. 
8.3 Should the IJB revise its Strategic Plan and agree to take forward any of the
proposals in Part B, the Council will be required to support and approve
strategic changes, such as raising eligibility criteria for social care and
managing waiting lists for new care packages. 
9. Conclusion 
9.1 The Perth and Kinross Integration Joint Board (IJB) faces a significant
financial challenge for 2025/26, with a projected net gap of £5.558 million,
largely driven by increased demand and complexity in social care services. 
9.2 Despite substantial savings achieved in recent years, the scale of current
pressures means that further reductions will be extremely difficult without
impacting service delivery. This reflects the national situation where IJBs are
experiencing depleted reserves, significant financial pressures, increasing
demand, and complexity of need. 
9.3 The IJB’s financial recovery plan outlines immediate actions and longer-term
strategic options, but without additional funding, service reductions such as
raised eligibility criteria and longer waits to receive a social care service will
be unavoidable. The Council’s support and close collaboration will be
essential to manage these pressures, assess the impact of recovery
measures, and ensure the continued provision of safe and effective care for
vulnerable residents.  Additional funding in-year to meet the funding gap for
social care services is requested to enable the HSCP to continue providing
social care to eligible people and allow the IJB time to scope out Part B of the
Financial Recovery plan and longer-term options for addressing the levels of
rising demand.
Page 261 of 396

Page 262

10. Impact and Value Assessment 
10.1 A comprehensive Equalities & Fairness Impact Assessment will be required
by the IJB for its meeting on 17 December 2025 and ahead of any decisions.
The impact assessments will need to identify the potential impact on
outcomes across all equally protected groups. In addition, the assessment will
be informed by legal and professional advice and identify the impact on
unpaid carers, workforce, as well as other parts of the health and social care
system including acute hospital services, and other Council services.
Crucially, these must also evaluate the impact on the social care market
which comprises commissioned providers in third and independent sectors. 
10.2 The impact assessment should thoroughly review how proposed actions may
affect the strong performance and improved outcomes achieved in the last 4-5
years, especially since Covid.   
11. Appendices 
Appendix 1 – IJB Key Strategic Performance Report – Quarter 1 2025/26 (27
October 2025) 
Page 262 of 396

Page 263

1 
PKC - GENERAL 
Perth & Kinross Integration Joint Board 
Audit & Performance Committee 
27 October 2025 
Key Strategic Performance Report – Quarter One 
Report by Chief Officer
(Appendix 1) 
Purpose of Report 
This report provides the Audit and Performance Committee with an overview on HSCP
performance at quarter one of 2025-2026 focusing on indicators agreed as part of the
IJB approved Performance Framework. The report also includes some key highlights
which demonstrate the extent to which the HSCP is delivering on the Integration Joint
Board’s Strategic Plan 2024-2027. 
1. Recommendation(s) 
1.1 The Audit and Performance Committee (A&PC) is asked to:
(i) Scrutinise strategic performance in relation to the delivery of integrated
health and social care services.
(ii) Approve the range of performance indicators included for future reporting.
(iii) Request that the HSCP develops targets for key performance indicators
ahead of the next report. 
2. Background/Proposal
2.1 This is the first performance report of 2025-2026 and takes a revised format
providing a wider range of performance indicators.
The IJB approved the Performance Framework in June 2025, with the aim of
bringing performance reporting closer to strategic planning of health and social care
services so that the connections between planning, delivery, performance and
improvement can be better understood and used to improve health and social care
delivery.
To put the framework into action, new plans are required for Older People, Adult
Services, and Primary Care Services. These plans will explain what steps are being
taken to deliver the Strategic Plan. They will include clear ways to measure
progress and set stretching and future focused targets.
Revised delivery plans are currently being drafted but are not yet finalised. During
their development, several indicators have been identified that expand the range
8
Page 263 of 396

Page 264

PKC - GENERAL
and type of measures which can be reported routinely. A proposed list is set out in
Appendix 1 and this report provides an overview of performance against these
indicators to the end of Q1 (quarter one) of 2025-2026.
2.2 The data used in this report is the most up-to-date available. It is provided at an
early stage and, in some instances, ahead of national publication. As further quality
assurance is undertaken in respect to this data, it may change. It is however useful
for management purposes and the readiness of the data is therefore balanced
against the potential delays which would be necessary to validate the data more
fully. 
Financial Context
2.3 The Health and Social Care Partnership delivered £12 million in savings between
2022 and 2025 and is projected to achieve an additional £2.5 million by the end of
March 2026. This has been achieved through a financial strategy focusing on
efficiency and redesign, including £1.1 million savings since 2023-2024 within
central support and management functions, with a 15% savings target applied
across all HSCP functions. These savings were achieved during a period of
population growth and increasing need and Audit Scotland in September 2025
reported that significant progress had been made towards recurring savings targets.
2.4 Due to the significant level of savings and efficiencies already delivered within social
care to meet additional population growth and increased demand, the remaining
options to further reduce expenditure, without adversely affecting performance and
outcomes, are limited and extremely challenging. Based on the most recent verified
Local Financial Return (LFR) for 2023-2024, for the level of adult social care
expenditure per 1,000 population, Perth and Kinross ranks as the 29th lowest of the
32 local authorities in Scotland.  Further demonstrating that, to date, the social care
budget has been managed efficiently and effectively; leaving the scope for
achieving further material savings without impacting on service delivery or
worsening outcomes for people who use services, very restricted.
2.5 The relationship between performance and the HSCP transformation programmes
is central to addressing the financial position of the HSCP and achieving
sustainable health and care services. Workstreams are prioritised with the dual aim
of improving care and achieving greater efficiency. Workforce capacity, rising
demand and increasing complexity present significant challenges and quarterly
reporting on performance is fundamental to demonstrating impact in this challenging
environment. 
3. Overview
The following provides an overview of key performance for quarter one of 2025-
2026.
Services for Older People
3.1 Work is underway in transforming Services for Older People, shifting the balance of
care for people aged 65+ from hospital-based to community-based models and
enabling them to live independently at home or in a home-like setting for as long as
possible. The key objectives are to prevent hospital admissions and support
independent living and to improve hospital discharge and post-hospital support. 
3.2 The transformation programme includes the establishment of integrated locality
teams (via “hubs in each of the three localities) made up of health and social care
Page 264 of 396

Page 265

PKC - GENERAL
professionals that will identify and support people at risk of frailty, falls, and delirium
early and include reablement and care at home staff with streamlined processes. 
These teams will also support smooth transitions home from hospital and prevent
readmissions, strengthen links between hospital discharge teams, community
hospitals, and care at home services, shift rehabilitation from hospitals to homes or
step-down beds and ensure occupational therapy/physiotherapy services are
available in the community. The Perth City Hub was established in November 2024
and the learning from this initial development is now being taken into the roll out of
this model/approach to other areas with similar teams in the North and South
Localities being assembled to work in similar ways. The programme is also working
to develop a single point of contact for people, carers and professionals to access
services more easily.
3.3 A new Discharge2Access (D2A) service redesigned internal care at home services
and will replace HART+ and Living Well Care. Based in Perth Royal Infirmary and
working across localities D2A will streamline processes and focus on urgent need
ensuring care is available for people in the right place at the right time, to support
them to live healthy, independent, and dignified lives.
3.4 Delivery of reablement support ensures better outcomes. Since January 2025
incremental improvements made to how services are accessed and delivered have
improved performance significantly. This has led to a large reduction in unmet need
(Chart 1 – unmet need for reablement support) and reduced people experiencing a
delayed discharge from hospital (Chart 2 – Total number of hours of unmet need
per week). In Q1 of 2025-2026 the number of hours yet to be provided has
increased for people in hospital as well as in the community. The continuation of the
transformation programme to implement the D2A model and integrated hubs will be
essential to recovering the progress made from December 2024 to June 2025. 
Chart 1 
Source: Adult Social Work Systems 
Page 265 of 396

Page 266

PKC - GENERAL
Chart 2 
Source: Adult Social Work Systems
After a sharp increase during and after the pandemic, the HSCP has consistently
reduced unmet need since August 2022 (Chart 3). People are now waiting less time
for the support they need to live independently from the time they are identified as
requiring social care support (both from hospital and in the community). This is
ensuring that they get the right care at the right time and before their circumstances
deteriorate and they require higher levels of personal care.
Chart 3 
Source: Adult Social Work Systems
The number of attendances at Accident and Emergency (A&E) can provide insight
on the level of demand for emergency care. Combined with other measures, like
emergency admission, it can indicate how accessible other services are. For
example, when people are unable to access the care they feel they need, they may
resort to A&E. Making community-based services more accessible for people can
help to limit demand on hospital-based services.
Over the last year, to the end of Q1 2025-2026, A&E attendances for the 65+
population are broadly stable with a marginal upward trend. 
Page 266 of 396

Page 267

PKC - GENERAL
Chart 4 
Source Ministerial Steering Group Indicator 3a
The number of admissions from A&E for the 65+ age group has also increased
marginally however more than half of all people who attended A&E in this age group
did not require admission to hospital.
Chart 5 
Source Ministerial Steering Group Indicator 1b
People can be admitted to hospital as an emergency without attending A&E and
over the same period overall emergency admissions have trended similarly. 
Page 267 of 396

Page 268

PKC - GENERAL
Chart 6 
Source Ministerial Steering Group Indicator 1a
Chart 7 provides a similar view to chart 6 but expresses the measure per 100,000
people of 75+ (data for 65+ is not available currently). The trend is similar, which
supports the indication that emergency admissions are rising as it removes the
variability which comes from changes in population size.
Chart 7 
Source: Trakcare
Looking more closely at where the rise in emergency admission occurs it indicates
that most admissions of this type come from people residing in Perth City and that
the rising trend exists in all GP cluster areas except Strathearn. 
Page 268 of 396

Page 269

PKC - GENERAL
Chart 8 
Source: Trakcare
Once people have been admitted to hospital it is important that they are discharged
as soon as it is safe to do so. There are a number of measures which are helpful in
this respect. Unscheduled hospital bed days provides an overview of the
consumption of inpatient bed days by the population. In Perth and Kinross
unscheduled bed days (chart 9) have reduced over the last year, meaning that
people stay in hospital for less time once admitted, and this is particularly the case
in the first quarter of 2025-2026. 
Chart 9 
Source: Ministerial Steering Group Indicator 2a
This reduction can also be seen when expressed as a rate per 100,000 population
which is helpful in describing overall performance as it removes variances in
population size and allows for better comparisons. Although Tayside overall
continues to have a lower rate of occupied bed days the gap is narrowing
(improving) and it is anticipated that this trend will continue. 
Page 269 of 396

Page 270

PKC - GENERAL
Chart 10 
Source: Trakcare
The average time that a person spends in hospital combines well with unscheduled
bed days as it measures the ‘Average Length of Stay’ (ALOS) for a person and
chart 11 shows that ALOS are significantly trending down (improving) over the
reporting period.
Chart 11 
Source: Trakcare
Reducing the number of days people spend in hospital when they are ready to be
discharged (delayed discharge) is key to ensuring good outcomes for people when
they transition to community-based care services. This is because they experience
less of the negative impacts of bed rest. Prolonged periods in hospital can lead to
significant physiological, psychological and functional decline also known as
“deconditioning syndrome”. This can mean that people take much longer to recover
their previous capabilities, if at all, and can unfortunately require greater care and
support. 
Page 270 of 396

Page 271

PKC - GENERAL
Chart 12 
Source: Ministerial Steering Group Indicator 4
Delayed discharges (chart 12) have reduced significantly over the last year and this
trend has continued into 2025-2026. The number of people experiencing a delay in
their discharge has been reducing over time since 2022. The HSCP has maintained
a position below the nationally determined rate for the last year. The national target
is 34.6 delays per 100,000 people. National data shows that on 17 October 2025,
the HSCP had 30.7 delays per 100,000 people across all sites and was maintaining
a position lower than the Scottish average of 44.6 delays per 100,000 people. 
An alternative way to consider this measure is in relation to the percentage of
people who are not delayed. Chart 13 shows that ‘discharges without delay’ have
continued to improve to the extent that 98.2% of people were discharged without
delay in Q1. For the 75+ population the average was 95.3%.
Chart 13 
Source: Trakcare
Services for Adults
3.5 The transformation programme across services for adults is being updated as the
current underpinning strategies come to an end in 2025. 
3.6 For mental health services, a key focus will be alignment with the Tayside Mental
Health whole system change programme to support a common approach and
implement a Model of Care for Adult Mental Health in 2026. The redesign is focused
Page 271 of 396

Page 272

PKC - GENERAL
on ensuring sufficient services are in place to intervene at the earliest opportunity
and prevent escalation. Drug and alcohol services are included in the community
mental health redesign to remove any unhelpful or artificial boundaries and to
support more coordinated and effective care. 
3.7 Older people’s mental health services experience intense challenge with people
living longer and presenting with high levels of frailty as well as cognitive
deterioration. It is increasingly difficult to support people back into the community
from hospital as care home placements for those with such complex needs are hard
to find. Discussions are underway with Tayside partners to consider economies of
scale along with proposals to strengthen enhanced community responses to both
reduce the need for admission but also achieve safe and supported discharge into
appropriate placements and avoid delay.
3.8 Services for people with a Learning Disability face specific challenges related to
increasing demand, need and complexity and high costs. Individuals with very high
levels of care requirements are supported within communities, placing new
demands on services, but also the skills and expertise required from our workforce.
Opportunities for service transformation are being taken forward with wider Tayside
partners, both in terms of achieving economies of scale and to ensure that care
providers are supported by a sufficient infrastructure to prevent breakdown.
Collaborative commissioning and resource transfer approaches are being explored.
The HSCP is working with Housing, Education, and Children’s social work services
to establish a more streamlined and long-term approach to managing the increasing
numbers and to support effective transitions., 
3.9 Measuring the level of demand for emergency mental health care provides a good
insight into how well people are able to access the right services in the community.
Over the last year to the end of Q1 2025-2026, mental health attendances to A&E
have improved steadily.
Chart 14 
Source: Trakcare
Occupied bed days in mental health settings provides an indication of the extent to
which people require inpatient support. Over the past year to the end of Q1 the
number of occupied bed days used by the 18-64 population has remained stable
across Perth and Kinross overall.
Page 272 of 396

Page 273

PKC - GENERAL
Chart 15 
Source: Trakcare
Occupied bed days for the populations of each locality have also remained broadly
stable with only marginal increases seen for Perth City and South Perthshire.
Chart 16 
Source: Trakcare
Delayed Discharges of mental health and learning disability patients increased in
late 2024 but has improved significantly since then and has trended down
(improved) over the course of the year. It should be noted that these delays relate to
a very small number of people (approx. 5 or less). Some of these patients have
been in long-stay hospitals and resourcing the right level of care for people within
community settings when their needs can be very complex is challenging. 
Page 273 of 396

Page 274

PKC - GENERAL
Chart 17 
Source: Trakcare
Psychiatry of Old Age (POA) - Demand for support through psychiatry of old age
has remained largely stable overall in the last year in Perth and Kinross.
Chart 18 
Source: Trakcare
This overall stability however masks significant increases in demand within Perth
City where demand has increased by around 50% from last year (Chart 19). 
Page 274 of 396

Page 275

PKC - GENERAL
Chart 19 
Source: Trakcare
Community Mental Health - Demand for Community Mental Health Services in
Perth and Kinross mirrors that of Tayside more generally and has remained largely
stable over the reporting year to the end of Q1 2025 (chart 20). However, chart 21
shows the variability in the demand for Mental Health services across different
localities with Perth City seeing far greater demand. 
Chart 20 
Source: Trakcare 
Page 275 of 396

Page 276

PKC - GENERAL
Chart 21 
Source: Trakcare
Waiting times for people to access services remain high and have increased over
the reporting period with the complexity of the conditions people present with being
a factor in this.
Chart 22 
Source: Trakcare
Recently the IJB received an update on the provision of Mental Health services in
Perth and Kinross and across Tayside. This report is available here and describes
work being undertaken to develop a new Community Mental Health and Wellbeing
Strategy, and how this will link to the wider programme of improvement and a Model
of Care for adult mental health which is being taken forward across Tayside. As this
work develops, further performance measures are being agreed across Tayside and
will be included within routine reporting.
Primary Care Services
3.10 Health and Social Care Partnership Primary Care services cover a variety of
managed services which support all aspects of delivery. Examples of this are
Community Treatment and Care Services where the number of appointments being
Page 276 of 396

Page 277

PKC - GENERAL
offered, and the number booked, have increased since December 2024. This is
improving access to this valuable service. Failure to attend appointments (DNA)
rates relate to people who have booked appointments but ‘did not attend’ for their
treatment. Reducing these instances to a minimum remains a priority.
Chart 23 
Source: Vision
Similar to CTAC the First Contact Physio service is funded via primary care. The
service offers people swift access to a physiotherapy consultation and treatment
with appointments made via GP practices.
Chart 24 shows the level of service demand over the past year with 12,256
appointments booked from an available 13,334, a service utilisation of 91.9%. For
Q1 this has improved to an average utilisation of 95.3%.
Chart 24 
Source: FCP Dashboard/Vision
Most (83.7%) people who accessed the service in the year to the end of Q1 were
new to the service (chart 25). 
Page 277 of 396

Page 278

PKC - GENERAL
Chart 25 
Source: FCP Dashboard/Vision
Outcomes for people accessing the service are also very good with 69.8%
discharged from the service with no further need for treatment.
Chart 26 
Source: FCP Dashboard/Vision 
Workforce
3.11 Sickness absence across Health and Social Care services is recorded in slightly
different ways across different systems for health and Council employees. Charts
27 and 28 show the trends over Q1 for Perth and Kinross Council and NHS Tayside
staff working in the HSCP. 
Page 278 of 396

Page 279

PKC - GENERAL
Chart 27 
Source: Perth & Kinross Council HR
Chart 28 
Source: NHS Tayside Air Report
Sickness absence has increased slightly in Q1 to 6.47% for the NHS Tayside staff
and 8.0% for the Perth and Kinross Council staff in the HSCP. There are a wide
variety of reasons for this with a very small number (less than 5) relating to work
related stress. Where this is the case measures are in place to support those
members of staff to return to work.
iMatter Directorate Report
3.12 The iMatter report at Directorate level in 2025 was completed by 62% of staff, with
an overall employee engagement index of 78 compared to 79 for last year. Overall
performance remains high across a broad range of metrics. In particular all
measures in relation to Staff Governance Standards achieved scores of at least 73,
chart 29 sets this out in more detail. 
Page 279 of 396

Page 280

PKC - GENERAL 
Chart 29
Strand Weighted
Index
Value
RAG Status
Well Informed 79 Green
Appropriately Trained and Developed 79 Green
Involved in Decisions 73 Green
Treated Fairly and Consistently, with Dignity and
Respect, in an Environment where Diversity is
Valued
80 Green
Provided with a Continuously Improving and Safe
Working Environment Promoting the Health and
Wellbeing of Staff, Patients and the Wider
Community
80 Green
While the weighted index values remain positive in 2025, all five strands used to
measure the extent to which staff governance standards are being experienced
have declined by one point since 2024. This will be monitored closely.
A small number of areas for improvement were identified from within the report.
These relate to the lack of visibility of board members, staff confidence in board
members, staff involvement in decisions relating to their organisation, and the
extent to which performance is managed well across the organisation. An
improvement action plan will be developed to take these issues forward.
The HSCP has managed higher levels of demand through a workforce plan which
seeks to deploy expertise in key service areas supporting positive recruitment and
retention. Research shows that high demand in health and social care creates a
significant negative impact on staffing, leading to increased vacancies and turnover,
staff burnout, and decreased quality of care. The constant pressure can result in
stress, exhaustion, and a decline in job satisfaction. Looking after the health and
social care workforce in the current climate is a key priority as quality health and
care delivery are directly linked to appropriate staffing levels and a workforce whose
wellbeing is actively promoted. The health and social care workforce is to be
commended for their central role in addressing higher levels of need and demand
and in achieving the current levels of performance through service redesign and
without significant increases in staffing. However, the workforce remains vulnerable
to the negative impacts outlined and even small increases in sickness levels as
indicated in this report are a concern. 
Patient & Service User Feedback
3.13 Hearing about the experience that people have when they access health and social
care services is important to better understand what is working well and where
improvements can be made. Although feedback is gained via a range of sources,
Care Opinion is the primary feedback mechanism as it allows people to tell their
story and share their experience. More information can be found here.
By the end of Q1 2025-2026, 142 stories were shared on Care Opinion with stories
viewed 10,367 times (by 10 September 2025). In the same period last year, 99
stories were shared, demonstrating an increase of 43.4% in feedback received.
Staff are responding in a timely manner to published stories with a mean response
Page 280 of 396

Page 281

PKC - GENERAL
time of 58 hours and 100% of responses are rated as helpful (4% higher than last
year). As a result of feedback in Q1, a change has been made to improve the clinic
environment and patient experience. The word cloud below gives a summary of
feelings expressed, with “thank you” “thanks”, “put at ease”, “relaxed”, “reassured”
and “supported” some of the most used words for Q1.
Chart 30 
Source: Care Opinion
People using Care Opinion can rate the service received. Chart 31 shows that all
services were rated 4.38 or above out of 5. Service punctuality/timeliness has
improved since the same period last year with other areas down slightly.
Chart 31 
Source: Care Opinion
The majority of stories were submitted via the website (82%), 8% via kiosk, 6% via
phone and 4% by leaflet. 
Page 281 of 396

Page 282

PKC - GENERAL
Chart 32 
Source: Care Opinion
In the stories posted, 40% identify themselves as a service user, 49% as the patient
and 6% as a relative. Others were submitted by carers, parent/guardians or staff
member posting for a carer/relative. This demonstrates that feedback is received
from a range of people including people that use services as well as the people that
care for them.
Chart 33 
Source: Care Opinion
4  Conclusion 
4.1 This is the first performance report of 2025-2026 and covers Quarter 1 (April-June
2025). The report expands the breadth and depth of measures included in routine
reporting. This will continue to evolve as new delivery plans for Older People’s
Services, Services for Adults, and Primary Care are developed with measures and
targets confirmed.
Page 282 of 396

Page 283

PKC - GENERAL
4.2 Demand for health and social care services is high and performance in delivering
against that demand is good with people spending less time in hospital and access
to services improving. Areas for improvement are informing the programme of
service development and transformation to improve access to high quality health
and care services and outcomes for people who require integrated health and care
services. 
Author(s)
Name  Designation Contact Details
Chris Jolly Service Manager (Business
Planning and Performance) tay.pkijbbusinesssupport@nhs.scot
Claire
McCarthy
Team Leader, Performance
Management and Reporting tay.pkijbbusinesssupport@nhs.scot
Page 283 of 396

Page 284

PKC - GENERAL
ANNEX
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND COMMUNICATION 
Strategic Implications Yes / None
IJB Strategic Plan Yes
Transformation Programme No
Resource Implications  
Financial  No
Workforce No
Assessments  
Equality Impact Assessment No
Risk No
Other assessments (enter here from para 3.3) No
Consultation 
External  No
Internal Yes
Legal & Governance  
Legal  No
Clinical/Care/Professional Governance No
Corporate Governance Yes
Directions No
Communication 
Communications Plan  No 
1. Strategic Implications  
1.1  Strategic Plan 
This the delivery of the Strategic Priorities identified within the Perth and Kinross IJB Strategic Plan
2024-27: 
1. Target Resources to where people and communities need help most.
2. Make it easier for people to get the help and support they need.
3. Provide health and social care supports close to home.
4. Work with communities to design the health and social care supports they need.
5. Improved integrated working.
6. Promote self-management and living well.
7. Value our workforce, support them to keep well, learn and develop. 
1.2 Transformation Programme
This report has no direct Transformation Programme implications however the work of the
transformation programme is taking a whole system approach to improvement and in doing so
feeds into improvements in performance. 
2. Resource Implications 
2.1 Financial 
This report has no direct financial implications. 
2.2 Workforce 
This report has no direct workforce related implications. 
Page 284 of 396

Page 285

PKC - GENERAL 
3. Assessments 
3.1 Equality Impact Assessment 
This report sets out progress in respect to performance in against the nationally agreed integration
indicators. In doing so it provides an update on progress in relation to the delivery of the IJB’s
Strategic Plan which includes the reduction of the impact of inequalities. 
3.2 Risk 
This report has no direct risk implications. 
3.3 Other assessments 
This report provides an assessment of performance against national integration indicators. 
4. Consultation 
4.1 External 
N/A 
4.2 Internal 
The contents of this report have been reviewed internally with the Senior Management Team. 
4.3 Impact of Recommendation 
N/A. 
5. Legal and Governance 
5.1 N/A. 
5.2 This report supports the delivery of the IJB’s public reporting responsibilities. 
6. Directions 
6.1 N/A. 
7. Communication 
7.1 N/A. 
8. BACKGROUND PAPERS/REFERENCES 
8.1 The documents that have been relied on in preparing the report, other than those committee reports
already referenced within the main body of the report will be kept available for inspection by the
public for four years from the date of the meeting at which the report is presented. 
9. APPENDICES 
9.1 Data sources.
Page 285 of 396

Page 286

PKC - GENERAL
Appendix – Data Sources 
Portfolio Chart Measure Source
Older People’s
Services
1 Number of hours of care yet to be provided split for that hospital and in
the community
Adult Social Work Systems
2 Total number of hours of unmet need Adult Social Work Systems
3 Total number of hours of unmet need (since 2021) Adult Social Work Systems
4 Number of A&E Attendances 65+ (All P&K) Ministerial Steering Group
5 Number of Admissions from A&E 65+ (All P&K) Ministerial Steering Group
6 Number of Emergency Admissions 65+ (All P&K) Ministerial Steering Group
7 Rate of Emergency Admissions per 100,000 population 75+  (All P&K) Trakcare
8 Rate of Emergency Admissions per 100,000 population 75+ (Locality
Level)
Trakcare
9 Unscheduled hospital bed days 65+ (All P&K) Ministerial Steering Group
10 Rate of Emergency Occupied Bed Days per 100,000 by Admissions 75+ Trakcare
11 Average Length of Stay 75+ (All P&K) Trakcare
12 Delayed discharge bed days 75+ (All P&K) Ministerial Steering Group
13 Discharge without delay as % of all discharges split by age group 18-74,
75+ and all ages
Trakcare
Services for Adults 14 Number of A&E Attendances (Mental Health) (All P&K) Trakcare
15 Number of Occupied bed days Mental Health 18-64 (All P&K) Trakcare
16 Number of Occupied bed days Mental Health 18-64 (Locality Level) Trakcare
17 Number of days spent in Mental Health hospital when ready to be
discharged 18-64 (All P&K)
Trakcare
18 Number of new POA referrals (All P&K) Trakcare
19 Number of new POA referrals (Locality Level) Trakcare
20 Number of referrals to Community Mental Health and Wellbeing Teams
(All P&K)
Trakcare
21 Number of referrals to Community Mental Health and Wellbeing Teams
(Locality Level)
Trakcare
22 Average number of weeks people wait for a service CMHT (Locality
level)
Trakcare
Primary Care 23 Community Treatment and Care Services demand:
- Number of appointments offered per month
Vision/CTAC Dashboard
Page 286 of 396

Page 287

PKC - GENERAL
- Number of appointments booked per month
- % DNA (Did not attend) per month
24 First Contact Physiotherapy demand
- % of appointments used
Source: FCP Dashboard/Vision
25 First Contact Physiotherapy demand
- % split of new/repeat users
Source: FCP Dashboard/Vision
26 First Contact Physiotherapy
- % people discharged following first appointment
Source: FCP Dashboard/Vision
Sickness absence  27 % Time lost to sickness absence HSCP PKC workforce Perth & Kinross Council HR 
28 % Time lost to sickness absence HSCP NHST Tayside workforce NHS Tayside Air Report
iMatter 29 Staff Governance Standards – Strand Score Index iMatter
People’s
experience of
Health and Social
care
30 Summary of language used to describe the experience people have
when accessing HSCP services.
Care Opinion
31 Overall ratings that people provided in relation to their experience of
HSCP services
Care Opinion
32 Number of Care Opinion stories posted by service users or their carers. Care Opinion
33 How people identify themselves within Care Opinion (supports better
understanding of the who is providing feedback)
Care Opinion 
Page 287 of 396

Page 288

Page 288 of 396

Page 289

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Perth and Kinross Council 
Date of Meeting: 29 October 2025 
Report Title: ALEO’s Review (Options Appraisal 2025) 
Report Number: 25/279 
Report Author: Charlene Guild, Strategic Lead (Projects &
Programmes) 
Organisational Lead: Thomas Glen, Chief Executive 
1. Purpose 
1.1 The purpose of this report is to set out the key findings, conclusions and
recommendations of a detailed options appraisal review undertaken to
determine the best structural model in future for our arm’s length external
organisations (ALEO’s). 
1.2 In addition, the paper gives an update on actions approved by full Council in
December 2023 (Report No. 23/347 refers) completed and underway to
contribute towards the future sustainability of ALEO’s. 
1.3 Sections 
1. Purpose 
2. Recommendations
3. Background and Context 
4. Options appraisal review
5. Findings 
6. Conclusion
7. Impact Value Assessment
8. Appendices 
2. Recommendations 
It is recommended that Council: 
2.1 Note the findings of the full ALEO Options Appraisal Review report from
EKOS Consultancy, set out in Appendix 2 
9
Page 289 of 396

Page 290

2.2 Approve the establishment of a Strategic Alliance between Perth & Kinross
Council, Culture Perth & Kinross, Live Active Leisure and Perth Theatre and
Concert Hall as detailed in section 5.2 of this report. 
2.3 Approve the progress of operational measures as set out in further work being
carried out in relation to efficiency savings and future sustainability of ALEO’s
through the Strategic Alliance model including income growth, shared
services, and workforce planning. 
2.4 Agree that feedback on progress, achievements and actions from the
Strategic Alliance be reported back to full Council on an annual basis from
October 2026. 
2.5 Note the progress made in approved actions in relation to ALEO’s through g
and concluding workstreams in relation to previous actions relating to ALEO’s
reported to full Council on 6 December 2023 as set out in Appendix 1. 
3. Background and Context 
3.1  This report presents the findings of an appraisal of options to change the
current structure of Arm’s Length Organisations (ALEOs) providing leisure,
culture, and performing arts services across Perth and Kinross. The ALEOs in
question are Live Active Leisure (LAL), Culture Perth and Kinross (CPK), and
Perth Theatre and Concert Hall (PTCH). 
3.2 ALEOs remain a well-established feature of public service delivery in
Scotland, with over 130 different bodies operating nationally and collectively
across thirty-two local authorities and managing more than £1.3 billion in
annual expenditure. These organisations are often structured as companies,
charities, or trusts and are commonly used to deliver services in areas such
as leisure, culture, social care, and economic development. While ALEOs
offer flexibility, potential cost savings, and access to tax reliefs, they can also
present governance challenges, particularly around accountability,
transparency, and conflicts of interest. 
3.3 While the Scottish Government continues to support ALEOs for delivering
these vital community services, it has been indicated that charity relief from
non-domestic rates will not be extended to newly created ALEOs. This has
meant local authorities are having to consider creative ways of operating and
taking a more cautious approach when considering future expansion and
changes to structure of existing ALEO’s. A robust benchmarking exercise
(LINK) has been undertaken, and it is clear from this research that our
challenges are shared nationally, and a number of local authorities are
currently undergoing similar work in relation to their own ALEO structures and
governance.   
Page 290 of 396

Page 291

3.4 Over the past decade, the operating environment for ALEO’s has become
increasingly more challenging. With the introduction of many new low cost
private and online providers, there is more competition locally and nationally.
In addition, people’s needs and expectations are changing and investment is
constantly required for our venues to remain competitive, attractive, and safe.
Coupled with the impact of the pandemic, increased costs of living and
inflationary costs as well as the challenging financial situation of local
authorities, there are a number of drivers to consider the future sustainability
of current levels of services and models of ALEO’s across Perth and Kinross. 
4 Options Appraisal Review 
4.1 As part of our wider Transformation & Change Programme (phase one to July
2024), an external review of operational activity was conducted by Glasgow
Audit with the resulting action plan presented to full Council on 6 December
2023. A detailed summary of progress on each action is attached as Appendix
1 with most workstreams complete or concluded. Any remaining actions have
been picked up as phase two of the Transformation & Change Programme
ALEO Review project. 
4.2 Following on from phase one project work, an ALEO Review Working Group
with Senior Officers from PKC and ALEO Chief Executives, was set up with
the aim of producing an options appraisal exercise for full Council which
detailed the financial and governance implications of different structural
models. The group met on a six weekly basis to agree the scope for the
exercise and a tender process was carried out in early 2025. EKOS
Consultancy in partnership with Integratis and Creative Services Scotland –
all with in depth knowledge and experience of the leisure, culture and
performing arts landscape - were awarded the contract. 
4.3 Work began in April 2025 on background research, financial modelling as well
as engagement with employees and Board Members with a final workshop
held with the ALEO Review Working Group and other relevant officers to
agree the draft Options Appraisal Review report (Appendix 2) on 20 August
2025. 
4.4 The expected outcomes agreed for the Options Appraisal exercise are
referenced clearly throughout the final report and reflect the need to make
changes to allow for future sustainability, more joined up / partnership
approaches and consolidation: 
• Ensure a more sustainable model of delivery of leisure and culture
services in future.
• Create a more streamlined and consistent approach across all ALEO
organisations in terms of systems and corporate support. 
Page 291 of 396

Page 292

4.5 A number of different structural models were considered for appraisal in
relation to structure, legal status, governance, and consolidation. There are
limitless options that could be explored, however for the purpose of this
exercise, it was agreed that all options were to be considered in line with the
current legal status of sole member organisations, with the exception of
Option 4 considering PTCH as an independent charity. The ALEO Review
Working Group agreed the following options to be included in the appraisal
exercise:
• Option 1: Bring all ALEOs in house to PKC.
• Option 2a: Bring some ALEO services in house (e.g. consolidation of
corporate services from ALEOs delivered by PKC) 
• Option 2b: as 2a but with library services brought back into PKC.
• Option 3a: Create one new ALEO. 
• Option 3b: two new ALEOs – streamlining corporate and back-office
services.
• Option 4: Create one ALEO for culture and sport and consider possible
change of status for Perth Theatre and Concert Hall. 
4.6 Full costings, financial breakdown and analysis of each option are detailed
within the Options Appraisal report along with one off and recurring costs in
relation to implementation of a new structural model. There is also a wider
appraisal against set criteria such as management focus, impact on staff,
opportunities for income generation, set up costs and risk. 
5. Findings 
5.1 As a result of the evidence gathered and presented on each of the options,
the report recommends that at this time, we do not pursue disruptive structural
change with no financial benefit and indeed, implications in terms of costs and
further investment. However, there are other actions that can be progressed
to achieve future financial sustainability of ALEO’s, more consistent and
streamlined approaches to service delivery and improved outcomes for
people across Perth & Kinross. The recommendations are set out below: 
5.2 Establishment of a Strategic Alliance 
5.2.1 The report recommends the establishment of a Strategic Alliance between
Perth and Kinross Council (PKC), Culture Perth and Kinross (CPK), Perth
Theatre and Concert Hall (PTCH), and Live Active Leisure (LAL). With the aim
of providing a formal framework for collaborative working to deliver ALEO
services across the area, this would require buy in from all of the
organisations and their Boards. The alliance would be formalised through a
Memorandum of Understanding (MoU) signed by the Chief Executives and
Chairs of each organisation and senior PKC officers.
Page 292 of 396

Page 293

5.2.2 It is proposed that a Strategic Alliance Board, comprising senior
representatives from each partner, be convened with quarterly meetings to act
as a lever for change, innovative thinking and alignment of priorities and
resource planning. Operating as a coordinating forum, not a delivery body,
enabling alignment without undermining the autonomy or governance of
member organisations. 
5.2.3 Key operational mechanisms would include shared working groups,
coordinated planning cycles, data and evaluation collaboration, joint staff
development opportunities, and resource-sharing arrangements. Shared
objectives of the Strategic Alliance would include enhancing community health
and wellbeing, strengthening inclusion and access for underserved groups,
growing the local economy and visitor economy, coordinating capital planning
to maximise public benefit, advocating for national recognition, and funding,
and seeking efficiencies in service delivery. 
5.3 Additional Operational Measures and workstreams
In addition to the formation of a Strategic Alliance, the report suggests
several practical measures to grow income, manage costs, and achieve
efficiencies. These include:
• Income Growth: Exploring potential for income growth in all three
ALEOs, particularly in LAL and PTCH, through pricing models,
prioritisation of revenue-generating services, and fundraising efforts.
• Property Rationalisation: Considering property rationalisation as part of
the move towards more integrated community facilities, particularly for
the library estate and parts of the leisure estate.
• Workforce Planning: Undertaking detailed workforce planning to
identify efficiencies in staffing structures.
• Other Efficiency Measures: Exploring greater collaboration across the
three ALEOs for efficiencies in areas like procurement and purchasing,
with a specific suggestion for establishing an agency agreement with
PKC for utility payments to reduce irrecoverable VAT.
6 Conclusion 
6.1 The report has provided evidence to suggest that none of the options
considered have the ability make savings or give a cost-effective sustainable
model for the future. The option with most potential would be the shared
services model although in its current format, this option would only achieve
modest savings with significant implications for systems, staffing, and one-off
implementation costs. 
6.2 However, as detailed above, there are a number of actions that can be taken
to allow for a more joined up approach, streamlining of interdependencies and
shared services where appropriate. 
Page 293 of 396

Page 294

The main recommendation, to create the Strategic Alliance between all four
organisations would help the consistency of approach as well as regular
formalised meetings to consider joint project and workstreams. 
7. Impact Value Assessment 
(Link here) 
8. Appendices 
Appendix 1 -  ALEO’s Review – Progress Update September 2025 
Appendix 2 – PKC ALEO Options Appraisal Review September 2025 
Page 294 of 396

Page 295

Appendix 1 
ALEO’s REVIEW – RECOMMENDATIONS & ACTION AS AT DECEMBER 2023
PROGRESS UPDATE – SEPTEMBER 2025
ACTION / RECOMMENDATION OWNER STATUS /
PROGRESS 
FURTHER DETAIL
GOVERNANCE & PROCUREMENT
1 A formal ALEO governance framework should include how
the Council’s Scrutiny Committee holds ALEOs to account
for the services they are contracted to provide under the
SLA, and how these contribute to the Council Plan. Specific
financial monitoring should also be reported at a reasonable
frequency for the purposes for monitoring the impact on the
General Fund (suggested quarterly). 
Reinstate quarterly monitoring of ALEO by Scrutiny and
Performance Committee. This is in line with Glasgow Audit
recommendations for the Council to ensure it is clear about
what the ALEOs deliver in return for the contract fee (Best
Value and Following the Public Pound). It is also important
given the significant financial pressures and risks relating to
ALEOs in the coming years. 
Ensure the current Council governance and monitoring
framework allows for sufficient oversight of risk across the
‘family group’ of services delivered by ALEOs. 
Strategic Lead –
Legal &
Governance
ONGOING 
COMPLETE 
ONGOING 
Governance is already in place within
individual contracts for services. However,
there is still work to be progressed with this
action currently underway and reflected in the
recommendations of the Options Appraisal
Report (Appendix 2) for a Strategic ALEO
Alliance agreement.  Financial monitoring for
all ALEOs is regularly reported to F&R
Committee. 
Quarterly reporting is in place to S&P
Committee, two meetings are written reports
only and two in person meetings with
presentations to Committee per annum. 
Although measures are already in place, the
Strategic Alliance recommended within
Appendix 2 will strengthen this approach.   
9
Page 295 of 396

Page 296

2 Review of the current size of the Boards in conjunction
with ALEO senior management to determine if they are
appropriately sized. A skills needs assessment should also
be considered. 
ALEO CE’s CONCLUDED There has been no suggestion as a result of
engagement on this project that there are any
issues with ALEO Boards or the size of them
and therefore no plans to review at this point. A
separate skills matrix exercise has been carried
out individually. 
3 Internal Audit Management should appoint an Internal
Auditor for each ALEO. This could be provided by PKCs
Internal Auditors. 
Strategic Lead –
Legal and
Governance
CONCLUDED While oversight and monitoring of ALEOs is
ongoing by PKC, the PKC audit team do not
have the capacity to appoint an individual and
the cost of this would outweigh any benefits
realised.  It should be noted that external
audits are carried out in relation to ALEO’s. 
4 A review of the procurement arrangements across the
ALEOs should be undertaken to determine the most
effective procurement arrangements to be put in place to
ensure compliance with the public sector procurement
regulations and where joint procurement arrangements for
particular commodities may bring financial savings to the
Council group 
Strategic Lead –
Legal and
Governance
ONGOING  The Options Appraisal report gives a quick win
for introducing savings on energy costs through
an agency agreement (joint procurement
process) which is being progressed. 
In addition, the Strategic Commissioning &
Procurement project is in progress as part of
our Transformation & Change programme.
Support and advice are given to ALEOs where
required. 
5 Move the ALEO contract monitoring/compliance post to
the corporate Strategic Commissioning and Procurement
Team. This will address a key person dependency risk and
enable ALEO contract monitoring to benefit from wider
improvements underway to Council procurement practice;
and align the ALEO contract monitoring closely with Legal
teams involved in the preparation of ALEO contracts 
Strategic Lead –
Economy,
Development
and Planning 
COMPLETE  The PKC Senior Leadership Structure Review
moved the ALEO contract monitoring function,
and this action is resolved. 
Page 296 of 396

Page 297

A review of the arrangements for the ALEOs applying for
grant funding should be undertaken to determine if there
are any opportunities to undertake joint working/joint
funding applications, particularly to those funders that all
of the ALEOs receive funding from. 
ALEO Working
Group / Strategic
ALEO Alliance
ONGOING We will continue to work in partnership with
ALEOs to consider any opportunities for joint
funding.
FINANCE
6 A review should be undertaken to ensure all parties are
clear on the rationale for services provided by PKC and
the associated recharges. Recharges should be based on
proper accounting practice, and any changes in service /
recharges may need to be reflected through corresponding
SLA financing changes. 
Strategic Lead –
Finance &
Business
Support /
Strategic Lead -
Digital 
CONCLUDED The options appraisal review has set out the
costings involved in a number of areas across
ALEO’s. For example, our IT services now have
a standard charge that is being applied
consistently across all ALEOs who are
accessing PKC systems. 
7 Consideration to be given to streamlining the finance
arrangements by the utilisation of the one financial
system for all ALEOs with separation between the 3
organisations using different company codes. Ideally this
would align with the PKC system. This would reduce
maintenance and support costs for the current three
separate systems that are in operation and also provide
some resilience with staff able to support the other
organisations if required 
Establish a shared finance function for ALEOs based on
the same financial system. This will allow the Council
more effective oversight of financial risks across the ALEO
‘family group’ of services, enable more complete
management information reports to be generated and
support wider efficiencies in financial management,
reporting and monitoring. 
Strategic Lead –
Finance &
Business
Support 
Strategic Lead –
Finance &
Business
Support
CONCLUDED 
CONCLUDED 
As per the evidence provided within the
Options Appraisal Review at Appendix 2, the
costs and resources required to implement
these changes outweigh any benefits. 
As above, the options appraisal review
considered the consolidation of all ALEO
corporate services into PKC and the costs
outweighed benefits.
Page 297 of 396

Page 298

8 Review the arrangements for delivery of the payroll
services at each of the ALEOs. As part of this the option for
having a payroll hub which delivers the payroll services to all
three of the ALEOs thereby keeping the money within the
Council group and making a net saving should be explored.
As a minimum the options for one of the other two ALEOs to
provide the payroll services to CPK should be explored. 
Strategic Lead – 
Strategic
Planning, People
& Performance /
HR Manager
CONCLUDED  As per the evidence provided within the
Options Appraisal Review at Appendix 2, the
costs and resources required to implement
these changes outweigh any benefits. 
STRUCTURE & CONSOLIDATION
9 Clear messaging should be used going forward so that all
parties are clear that they are part of the wider Council
Group. This perspective is important when assessing
options for changes to services and structures. 
ALEO Review
Working Group 
CONCLUDED  This recommendation has been taken forward
as the principle for partnership working on the
ALEO Options Appraisal Review process. 
Moving forward, we will continue to build on
key relationships and closer working between
PKC and the different ALEOs. 
10 Starting from 2024/25, corporate functions across the 3
current ALEOs should be consolidated, prioritising: -
Finance -Business conferencing - Facilities Management -
HR (policy and transactional services e.g. payroll) 
Strategic Lead –
Projects &
Programmes
CONCLUDED  This action has been reviewed as part of the
options appraisal process and
recommendations for taking forward
presented. 
At this time, the cost and resources to
implement this structure outweigh any benefits
that could be realised. However, new
innovative and efficient ways of working should
continue to be explored together in future. 
11 A full review of all back-office services provided by each of
the ALEOs to be undertaken to seek opportunities for more
joint working or creation of a hub of excellence that could
deliver a specific function to all 3 ALEOs. As a minimum
when one of the ALEOs recognises the need for additional
ALEO Review
Working Group
ONGOING  The Strategic Alliance proposed within the
recommendations of Appendix 2 will pick up
on this action and ensure that support, advice
and where possible improved collaboration /
shared services are always considered
Page 298 of 396

Page 299

help with a support service, the first port of call should
always be PKC and the other 2 ALEOs before going out to the
market. 
between PKC and the ALEOs as a first port of
call. 
12 There is wider potential to integrate ALEO and Council
functions on Perth city events and destination marketing,
and to extend shared service arrangements with wider
funded partners 
ALEO Review
Working Group
ONGOING  Appendix 2 will pick up on this action and
ensure that support, advice and where
possible improved collaboration / shared
services are always considered between PKC
and the ALEOs as a first port of call. 
PROPERTY
13 A full review of all properties from which the ALEOs
currently deliver services from. The review should include
the following: - condition and suitability of each property; -
the annual repairs and maintenance costs for each property
and whole life costing of the assets, including information
on whole life costing; and - the usage of each property. This
information should then be used to determine if best use is
being made of the joint assets and inform decision making
as part of any options appraisals for future transformation /
service reform of all the property assets. This review should
take account of the work currently ongoing in relation to
properties including LAL/sports properties and the previous
work in relation properties including the library property
review. There are examples in other authorities of a variety of
services being delivered from the same properties, e.g.,
libraries incorporating access to jobs, skills and benefits
advice. 
Strategic Lead –
Property
Services
CONCLUDED  This action is being taken forward as part of the
Corporate Asset Management Plan
programme. For info - there are currently 35
buildings used by ALEO’s (32 owned by PKC
and 3 by LAL). 11 of these are libraries.
14 The current ALEO property portfolio should be
rationalised to ensure it is affordable and sustainable. This
will also enable business rates relief, which helps protect
front-line services, to be maximised. 
Strategic Lead –
Property
Services 
ONGOING  Plans are currently underway to consider
rationalising the property portfolio. An example
of this is the work being undertaken with
communities regarding future use of library
Page 299 of 396

Page 300

buildings. All ALEO managed properties have
been reviewed as part of the Leisure Asset
Review, with a view to utilising these assets in a
more sustainable way. 
15 Consolidation of the Perth city sports offer onto one site
should be considered. This recommendation is based on
evidence from the Leisure Assets Review about affordability
of maintaining 3 major sites in the city centre, alongside
rising cost pressures, operating deficits, and changing
customers/markets. 
Strategic Lead –
Property
Services 
ONGOING  As above, plans are underway on this action
including PH20.  Progress on this will be
reported to full Council when appropriate. 
16 Consolidate key library provision to Community
Campuses and the AK Bell Library. Trial the Open Library
model at Scone and co-locate other rural library services
where possible within the wider Council/public estate. This
recommendation is based on evidence and
recommendations from a review of libraries carried out by
CPK on behalf of the Council which identified changing
usage and rising cost pressures. 
Strategic Lead –
Property
Services /
Culture Perth &
Kinross 
ONGOING  The implementation of the Library Strategy is
underway with local communities and is f
outcomes will be presented to Council in due
course. 
17 Consolidate CPK and potentially PTCH storage facilities
as part of the Smarter Working programme. This
recommendation would enable storage for the CPK
museum and archive collections plus storage of some PTCH
resources at Pullar House, if Council takes a decision to
retain the building next year. 
Strategic Lead –
Property
Services / Legal
& Governance 
ONGOING  The corporate archive records function has
now been consolidated into the PKC Records
and Information Team from Culture PK which
has meant moving staff between the
organisations. 
In addition, there are still some workstreams to
be progressed e.g. additional PTCH / Museum
Collections Storage space within Pullar House.  
18 Expand support for the Community Asset Transfer (CAT)
programme for Community Halls operated by LAL. This
recommendation is based on wider corporate asset
Strategic Lead –
Housing &
Communities
ONGOING  Across the eight identified halls progress
varies. Pitlochry is now under community
management and aiming for full ownership by
Page 300 of 396

Page 301

management work to support CAT where feasible. The
Leisure Assets Review recommends that additional support
to communities is designated from 2024/25 onwards to
enable this.   
October 2025, Dunning in lease discussions,
and Coupar Angus preparing a feasibility
funding bid. Other communities have shown
limited engagement, often due to expectations
that PKC and LAL will continue operating the
sites. Tulloch presents a more complex case,
with conditional interest tied to future funding
decisions and uncertainty around the Tulloch
Institute’s lease renewal in 2028.
19 Consider disposal of the Fergusson Gallery and Willam
Soutar House. The Fergusson Collection is now displayed
at Perth Art Gallery following investment in the latter and
various attempts to operate the William Soutar House as an
events space have not proved sustainable over the years.
Disposal of these assets will create capital receipts for
reinvesting in services. 
Strategic Lead –
Property
Services
ONGOING  The Fergusson Gallery is now closed to the
public. Work is progressing in relation to
William Soutar House. The property has been
declared surplus to operational requirements
by Perth and Kinross Council and a
consultation is currently underway. The house
was ‘gifted’ by William Soutar’s sister and was
originally accepted subject to the condition
that the house would revert to her or her
successors, should the local authority no
longer have reason to occupy it.  Therefore, the
Council proposes to return Soutar House to
Evelyn’s successors, subject to approval from
the Perth Common Good Fund Committee. The
consultation ends on 7 November 2025. 
ICT
20 A review of the ICT arrangements across the ALEOs
should be undertaken to map out the current arrangements
for: - Networks and server estate - ICT security -
Applications & currency - Service desk - End User
Computing. Thereafter work should be undertaken to ensure
the ICT related risks are managed appropriately from a
group perspective. 
Strategic Lead –
Digital & IT
COMPLETE  IT systems and arrangements and the
implications of change have been considered
as part of the ALEO Options Appraisal Review
with no recommendation to make changes at
this stage. 
Page 301 of 396

Page 302

Work can continue to develop this and ensure
that any proposed changes are considered in
terms of efficiency and shared services.
PEOPLE 
21 A review of the salary structures should be undertaken to
determine if harmonisation of similar roles can be
undertaken. Discussions should also be undertaken with
regards the real living wage. 
A review of Employment issues should be undertaken to
assess any potential risks. 
Strategic Lead -
Strategic
Planning, People
& Performance /
HR Manager
CONCLUDED 
CONCLUDED 
As part of the ALEO Options Appraisal Review,
harmonisation of terms and conditions across
ALEO’s has been considered for each
structural model proposed. There is a
significant cost attached to this area and at
present no recommendation for change being
presented.  The Real Living Wage has been
implemented across all organisations for
consistency. 
There has been no additional risk to the
challenge of equal pay as a result of the review. 
22 Senior management structures should be reviewed in
light of the consolidation of corporate functions. 
Strategic Lead -
Strategic
Planning, People
& Performance /
HR Manager 
CONCLUDED  The ALEO Options Appraisal Review has
considered various different senior
management structures along with costings /
benefits etc. of change. 
Page 302 of 396

Page 303

PKC - GENERAL 
Option Appraisal for Arms
Length External Organisations in
Perth and Kinross
Appendix 2
Report for Perth and Kinross Council | September 2025
9
Page 303 of 396

Page 304

Please consider the environment before printing this document
PKC - GENERAL
Direct enquiries regarding this report
should be submitted to: 
Brian McLaren, Managing Director
Email: brian.mclaren@ekos.co.uk   
EKOS Limited
St. George’s Studios
93-97 St. George’s Road
Glasgow, G3 6JA
Reg 145099
www.ekos-consultants.co.uk 
Page 304 of 396

Page 305

PKC - GENERAL
Contents 
1 Introduction 1
2 Context 4
3 ALEOs 15
4 Options 39
5 Appraisal 44
6 Conclusions & recommendations 77
Appendix A: ALEO Review Working Group 84   
Page 305 of 396

Page 306

1 
PKC - GENERAL
1 Introduction
1.1 Introduction
This report presents the findings of an appraisal of options to change the current structure
of Arm’s Length Organisations (ALEOs) providing leisure, culture and performing arts
services across Perth and Kinross. The ALEOs in question are:
• Live Active Leisure (LAL).
• Culture Perth and Kinross (CPK).
• Perth Theatre and Concert Hall (PTCH).
The study takes place at a challenging time for local authorities. The combination of many
years of austerity measures to reduce the UK budget deficit and the COVID-19 pandemic
have had a huge impact on public sector finances. These external shocks compound long
standing challenges facing councils with increasing demand for services such as health
and social care, and more recent cost increases due to a period of high inflation and fast
rising energy and staff costs.  
The operating environment for publicly funded leisure and culture services is currently
very challenging. Low cost private and online providers; changing customer needs; very
high levels of capital investment needed for venues to remain attractive, competitive and
safe; and decreasing funding available are all drivers for this review of current ALEO
structure and models. 
In 2024/25, ALEOs faced significant internal recurring revenue pressures as well as
provisionally approved savings totalling at least £2.5m. With decreasing funding available
and cost of living / inflationary increases continuing, there needs to be some
consideration of how the services delivered by ALEOs remain sustainable in future. 
At a full Perth and Kinross Council (PKC) meeting on 6 December 2023, a full report was
presented setting out clear recommendations for reviewing the ALEO corporate service
structure. This work forms part of the wider Transformation & Change programme being
led by PKC alongside ALEO partners and builds on previous work and analyses
conducted by Perth and Kinross Council (PKC).  
Page 306 of 396

Page 307

2 
PKC - GENERAL
1.2 Project Objectives and Method
Study purpose
The primary purpose of the study is to undertake an appraisal of a series of defined
options for the delivery of culture and leisure services in Perth and Kinross. These options
were set out in the council’s previous review work and are as follows: 
• Option 1: Bring all ALEOs in house to PKC.
• Option 2: Bring some ALEO services in house (e.g. consolidation of corporate
services from ALEOs delivered by PKC) and ALEOs retain own identity / library
services brought back into PKC.
• Option 3: Create one new ALEO / two new ALEOs – streamlining corporate and
back-office services.
• Option 4: Create one ALEO for culture and sport and considering possible change
of status for Perth Theatre and Concert Hall.
Method
The study was conducted in seven stages, as shown below. 
Background information, including financial information, monitoring reports and staffing
structures were provided to the consultant team by the ALEOs and PKC, and a
1. Inception
2. Data
Collection &
Baseline
3. Stakeholder
Engagement
4. Financial and
Operational
Analysis
5. Option
Development
and Appraisal
6. Draft Report
7. Final Report
and
Presentation
Page 307 of 396

Page 308

3 
PKC - GENERAL
programme of consultation was agreed with the ALEO Review Working Group (see
Appendix A for a list of members). The consultations included council officers and
elected members on the ALEO Boards, senior managers across the three ALEOs and a
selection of ALEO Board members. 
Following the consultation work, the team completed a financial analysis of the ALEOs
and each of the defined options. The financial appraisal was then supplemented with a
more qualitative appraisal drawing on the consultation inputs and the wider experience of
the consultant team as reported here. 
Page 308 of 396

Page 309

4 
PKC - GENERAL
2 Context
2.1 National Context
2.1.1 External Delivery Models
Over the last 40 years or so, Councils in Scotland (and elsewhere) have increasingly
looked to alternative delivery models for services, including culture and leisure services.
The most commonly used alternative to in house delivery of culture and leisure is that of
the arm’s length external organisation (ALEO). 
ALEO is not a legal company structure. Rather ALEOs may take different forms including
limited companies, limited liability partnerships, community interest companies and
trusts. 
In Scotland, ALEOs are normally established as a limited companies with charitable status,
with the charity status conferring benefits in the form of exemption from non-domestic
rates for properties managed by the ALEO. This benefit was effectively discontinued
following the Barclay Review of Business Rates in 2017. While the exemption continues for
properties that were already managed by ALEOs (councils now have a cap of the relief
that they can claim), no new properties coming under ALEO management will have the
exemption, a change that acted as a disincentive to councils seeking to establish new
ALEOs or add more properties into the existing trusts. 
There are, of course, other benefits attributed to the ALEO model. Freedom from Council
bureaucracy, access to other sources of funding and the ability to develop more agile,
entrepreneurial cultures are frequently identified benefits of the externalised models.
These benefits led more and more councils to seek to externalise service delivery, and for
more to join culture and leisure services together to form larger, multi-function ALEOs in
which revenue generating services such as health and fitness could help cross-subsidise
those that create little income, such as libraries.
ALEOs typically receive payments for their council for the delivery of services (commonly
known as a management fee) and may also make use of council services in areas like
payroll, finance, HR and IT. Most (but not all) are established as single member companies
in which the council is the sole member.
Page 309 of 396

Page 310

5 
PKC - GENERAL
The ALEO model has always been politically sensitive, with some considering it to result in
reduced accountability for what remain public services, even despite the presence of
elected members on ALEO Boards and quite clear governance structure and practices.
Indeed, a number of councils, including North Lanarkshire and Falkirk, have recently
brought services back in house, foregoing rates savings in favour of what is perceived to
be a greater degree of control over public services.  
However, only ten councils continue to deliver both culture and leisure in house,
underlining the appeal of the ALEO model. Of those that do have one or more ALEOs, 12
have a single ALEO covering both culture and sport. 16 councils deliver culture services in
house and ten deliver leisure services.
2.1.2 Budget Pressures
A recent report for Community Leisure UK1 paints a very challenging picture for local
authority culture and leisure services. The report found growing financial pressure on the
services, regardless of whether they were delivered in house or externally, reflecting a
number of factors:
• over a decade of austerity measures affecting public finances following the
2008 financial crisis everting pressure on local government budgets. 
• growing demand for health and social care services as a result of the ageing
population in the UK and in Scotland. This has required increases in resources
for these services without growth in public sector budgets to match, hence
other services having to find savings.
• increasing ringfencing of council budgets for national priorities, reducing more
discretionary spend.
• lack of statutory protection for culture and leisure services, meaning that when
Councils face difficult budget decisions (as they have done for many years now)
they prioritise statutory services, again resulting in larger reductions for non-
statutory provision like culture and leisure. 
1 Review of Culture and Leisure Services in Scotland (2024), report by EKOS for Community Leisure UK,
Creative Scotland and sportscotland.
Page 310 of 396

Page 311

6 
PKC - GENERAL
• growing competition from the private sector in health and fitness (e.g. low-cost
gyms) which has impacted on revenue generation for leisure services.
More recently, the combination of the pandemic, rising inflation and the cost-of-living
crisis have added further pressure to services that have already sustained budget cuts for
more than 10 years. 
The report also suggests that funding is expected to continue to fall, with previous
reductions in staff and, in some cases, facilities impacting the range and quality of service
provision. Many across the sector expect that these trends will continue, with further
reductions in staff and facilities, and resulting negative impacts on services.
2.2 Strategic Context
This section outlines the key local, national, and sector-wide policies and strategies that
have informed the options appraisal for the future structure and governance of Arms
Length External Organisations (ALEOs) delivering leisure, culture, and performing arts
services in Perth and Kinross. These documents provide critical context on strategic
direction, governance expectations, legal frameworks, financial sustainability, and sector-
specific best practice. Ensuring alignment with these strategies will help ensure that any
future model reflects the Council’s aspirations and statutory responsibilities and is
positioned for long-term success.
2.2.1 Perth and Kinross Council Strategies and Initiatives
ALEO Transformation Review Report (Perth and Kinross Council, December 2023)
This internal report sets out the Council’s rationale for undertaking a full review of its
existing ALEO arrangements. It identifies several challenges including financial pressures,
governance risks, strategic misalignment, and single-point dependencies in monitoring
arrangements. The report outlines the need for stronger integration with Council priorities
and greater transparency in performance and oversight.
This report provides the official mandate for the current options appraisal (although as
discussed below the ALEO Review work has a longer history). It defines the scope, drivers
for change, and the critical success factors to be achieved through any revised
governance or delivery model. 
Page 311 of 396

Page 312

7 
PKC - GENERAL
Perth and Kinross Community Plan (Local Outcomes Improvement Plan) 2022-2032
The Perth and Kinross Community Plan identifies five priorities to enable “a confident,
ambitious and fairer Perth and Kinross”. These priorities target poverty, health and
wellbeing, employability, digital participation and learning and development and provide
a framework for action across the community planning partners.  
Perth and Kinross Council Corporate Plan 2022/23 – 2027/28
Aligned to the Community Plan, the PKC Corporate Plan sets out the Council’s priorities
over a five year period and reflects the growing challenges post-Covid with cost of living
pressures and increasing inequality. These priorities include actions to tackle poverty,
improve health and wellbeing, grow the local economy, address the climate emergency
and ensure a positive future for children and young people. All ALEOs within Perth and
Kinross have a clear role to play here, not least in supporting economic growth and
improving health and wellbeing.   
Perth and Kinross Local Economic Action Plan (2025-2030)
The Council priorities are reflected in the Perth and Kinross Economic Plan, with a strong
focus again on addressing poverty and inequality and realising the opportunities of net
zero. The Economic Plan is itself aligned to the Tay Cities Regional Economic Strategy
(2019-2039) and the Prospectus for Regional Growth (2025-2035) which both recognise
the role of tourism and culture in supporting the long term economic ambitions of the Tay
Cities region. 
Perth and Kinross Tourism Strategy and Action Plan 2025-2030
Reflecting the priority attached to tourism and culture in the Regional Prospectus, the
Tourism Strategy and Action Plan sets out Perth and Kinross’ ambition to grow its tourism
economy and culture is a strong feature (both PTCH and CPK are members of the Tourism
Business Partnership).  
Physical Activity and Sports Strategy 2023–2028
This strategy sets out the Council’s ambitions to improve physical and mental health
outcomes by increasing levels of physical activity, particularly among children, older
adults, and communities facing barriers to access. It includes a strong emphasis on
community engagement, inclusive facility design, and low-carbon infrastructure.
Page 312 of 396

Page 313

8 
PKC - GENERAL
Any revised ALEO structure must enable the delivery of these objectives through its
governance, resourcing, and service delivery approach such that it can better support
increased participation, reduced inequalities, and the Council’s net-zero targets through
investment and programming.
Culture Strategy 2023–2028
The Culture Strategy positions culture and creativity as central to inclusive economic
growth, education, mental wellbeing, and the Council’s wider regeneration and place-
making ambitions. It promotes access to culture for all residents and visitors, supports
community-led activity, and encourages partnership across sectors.
As cultural services (including performing arts) are currently delivered through ALEOs,
any revised model must be capable of supporting the Strategy’s ambitions. This includes
ensuring cultural access, enabling collaborative delivery, and supporting cultural
infrastructure that contributes to wider economic and wellbeing outcomes.
PH2O Leisure Development Project
PH2O is a major proposed capital investment in leisure and wellbeing facilities in Perth
city centre. It represents a significant redesign and consolidation of existing services, led
in partnership between the Council and Live Active Leisure.
The success of PH2O is directly tied to the governance and operational arrangements that
will follow this review. The appraisal must assess how different structural options could
support capital financing, long-term asset management, service integration, and risk-
sharing for a high-profile and high-value project.
Active Travel and Placemaking Initiatives
Perth and Kinross Council has invested in active travel infrastructure and place-making
initiatives that promote healthier lifestyles, community connection, and environmental
sustainability. These include cycle hubs, walkable routes, and integration of active design
into public spaces.
ALEOs delivering culture and leisure services must operate in alignment with these wider
objectives, maximising use of local assets and contributing to strategic outcomes related
to health, sustainability, and connectivity.
Page 313 of 396

Page 314

9 
PKC - GENERAL
Active Schools and Physical Education, Physical Activity and Sport (PEPAS) Programmes
These Council-supported programmes aim to embed physical activity and sport into the
lives of young people by working in partnership with schools and community groups.
The ALEO structure must continue to facilitate, support, or partner with these
programmes. This may include opportunities to formalise relationships, improve
alignment, and ensure delivery is consistent with wider health and education goals.
2.2.2 Scottish National Policy Context
Community Wealth Building (Scottish Government)
Community Wealth Building (CWB) is a people-centred approach to local economic
development, which focuses on fair work, local procurement, inclusive ownership, and
making better use of public assets by harnessing the economic leverage of local ‘anchor’
organisations.
As anchor organisations, ALEOs can play a significant role in advancing CWB locally by
enabling greater retention of wealth in local communities through procurement practices,
community asset ownership, and workforce engagement.
Community Empowerment (Scotland) Act 2015
This legislation enhances the rights of communities to influence decisions about public
services and assets, including rights around participation and asset transfer. ALEO
governance must be responsive to these legal duties, facilitating community influence,
transparency, and accountability.
OSCR Guidance for ALEOs and Charities
Guidance from the Scottish Charity Regulator sets out how charitable ALEOs must
maintain independence, manage conflicts of interest, and demonstrate public benefit.
The guidance has significant implications for the legal status, financial arrangements, and
governance of ALEOs. The appraisal must examine whether moving to, continuing with or
departing from charitable status is compatible with desired outcomes.
Page 314 of 396

Page 315

10 
PKC - GENERAL
Standards Commission Guidance on ALEOs (2024)
This guidance clarifies the responsibilities of elected members who serve on ALEO
boards, including expectations around ethical conduct, conflicts of interest, and
transparency.
Governance models must ensure that elected member involvement is appropriately
structured, well-supported, and compliant with national standards.
Audit Scotland – Councils’ Use of ALEOs (2018)
This national review evaluates how well councils manage ALEOs, highlighting risks around
oversight, transparency, performance monitoring, and financial management. It offers a
framework for identifying risks and improvement areas. 
2.2.3 UK-Wide Sector Benchmarking and Best Practice
Accounts Commission – "Are You Getting it Right?" (2016)
The Accounts Commission published this practical guide for setting up and managing
ALEOs, focused on good governance, public accountability, and value for money. It
provides a set of best practice criteria against which the Council can test the robustness of
different options during the appraisal process.
Community Leisure UK Sector Insights (2024)
A recent sector-wide review of the challenges and opportunities facing leisure and culture
trusts, including issues related to income recovery, digital delivery, and workforce
development. The report highlights trends, pressures, and innovations across the sector,
helping to contextualise ALEO performance and future-proof delivery models against
national patterns.
2.2.4 Conclusion
This policy and strategy review has ensured that the ALEO options appraisal is firmly
grounded in both the local strategic ambitions of Perth and Kinross Council and the
broader policy landscape in Scotland. It has taken into account key national priorities such
as community empowerment, community wealth building, public service reform, and the
Page 315 of 396

Page 316

11 
PKC - GENERAL
transition to net zero – all these priorities are shaping how public services are governed
and delivered across Scotland.
By engaging with these frameworks in detail, the appraisal has ensured that the proposed
structural changes are legally sound, financially sustainable, and aligned with the
Council’s objectives around inclusive economic growth, health and wellbeing, climate
resilience, and local democratic accountability. 
This provides a strong foundation for implementing future delivery models for leisure,
culture, and performing arts services that are responsive to community needs, resilient to
future challenges, and consistent with evolving Scottish policy expectations.
2.3 Council Transformation Programme
The ALEO Review work takes place within the wider context of PKC’s Transformation
programme, itself governed by the Perth and Kinross Transformation and Change
Strategy 2022/23-2027/28 in line with the Council’s Corporate Plan. 
The Transformation and Change Strategy is designed to address the evolving needs of
PKC and its communities over a five-year period. It aims to create a fairer, more
prosperous, and sustainable future by aligning with the Scottish Government’s
commitments and addressing the many social, economic, and environmental challenges
faced by the Council now and in future.
Phase One, completed in June 2024, set the stage for more changes, and now Phase Two
will build on that success until 2027/28. This phase focuses on redesigning services,
managing risks, and engaging with stakeholders to ensure services runs efficiently.
A key part of this strategy is the ALEO Review, which looks at the governance, financial
health, and service quality of ALEOs linked to the council. The review will help inform
decisions in Phase Two, ensuring these services are efficient and sustainable in future.
Overall, the strategy and review aim to create a more efficient, responsive, and
sustainable council that meets the community's needs.
The strategy is not a standalone document but is supported by a wider strategic
framework that includes the Community Plan, Corporate Plan, and individual team plans.
The Corporate Plan 2022-27 sets out PKC's vision and corporate outcomes, which are
Page 316 of 396

Page 317

12 
PKC - GENERAL
aligned with the council's values and designed to mitigate the impact of various
challenges over the next five years. The strategic outcomes are underpinned by seven key
priorities that outline the areas of greatest need that PKC can most directly influence. 
2.4 ALEO Review
The ALEO Review work in Perth and Kinross dates back to the pre-Covid period and may
have been driven, at least in part, by concerns over the financial and operating
performance at that time of PTCH.  
As far back as 2018, a review considered options for the establishment for a single
Cultural Trust to improve financial sustainability and operational effectiveness. Key
options considered included maintaining the existing setup or creating a single,
consolidated Culture Trust, with this option generally scoring higher in evaluations due to
potential operational efficiencies.
The recommendations also addressed governance issues, financial oversight, and
maximising the cultural sector’s economic and social impacts. These recommendations
were informed by challenges identified in the report, such as the need for integrated
service delivery, the importance of digital engagement to attract new audiences, and the
need for sustainable income generation beyond public funding. Concerns over financial
risk due to dependency on Council funding and inadequate long-term income
diversification were also highlighted as crucial areas for improvement.
Although these recommendations were accepted as part of a longer-term strategy for
transforming cultural services and supporting future growth in tourism and community
engagement within Perth and Kinross, there was no move toward a different model of
delivery. 
A paper to the Strategic Policy and Resources Committee in April 2019 focused on
advancing the Cultural Trusts Transformation Project. This initiative aimed to review and
reshape the operation of cultural services, including PTCH, to ensure sustainability and
alignment with council priorities. Specific recommendations included exploring potential
new operational models and securing long-term funding mechanisms to enhance cultural
offerings and operational efficiency across the Council's cultural assets.  
Page 317 of 396

Page 318

13 
PKC - GENERAL
The committee accepted a series of recommendations for further work including pursuing
the development of a business case for a single Cultural Trust. This set the stage for
further steps in restructuring and collaborative opportunities for cultural development
within Perth and Kinross. However, details on the specific operational models or financial
strategies considered were limited at this stage in public records. 
A year later in April 2020, a further paper to the Strategic Policy and Resources
Committee proposed: 
• a new governance and delivery structure for services currently delivered by ALEOs
including the insourcing of libraries, archives, museums and gallery collections
management to PKC and the establishment of a new streamlined ALEO for cultural
services. LAL would take on facilities management.
• investigation of wider efficiency / joint working potential.
• community stakeholder engagement on wider funding arrangements and
community participation.
• implementation of new third-party funding arrangements.
While these proposals were adopted by the Committee, it appears that the pandemic
disrupted progress. We also understand that differences in terms and conditions between
CPK and PTCH were also considered a barrier to structural change on the basis of cost. 
In April 2023, the ALEO Review was revisited, this time extending beyond the two cultural
ALEOs to also include consideration of LAL. A paper to Perth and Kinross Council in
December 2023 as a result of an external review by the organisation Audit Glasgow,
made twelve recommendations, as follows:
• from 2024/25, corporate functions across the three ALEOs should be consolidated
starting with finance, HR, facilities management and business conferencing.
• senior management structures should be reviewed in light of the above
consolidation.
• a review of employment issues should be undertaken to assess any potential risks.
• the ALEO property portfolio should be rationalised to ensure it is affordable and
sustainable.
• consolidation of the Perth sports offer onto a single site should be considered
based on evidence from the Leisure Assets Review.
Page 318 of 396

Page 319

14 
PKC - GENERAL
• consolidation of key library provision to Community Campuses and the AK Bell
Library (this was subsequently reversed by PKC in February 2025 to be reviewed
again in 2027 as part of the Council’s budget setting process.
• consolidation of CPK and potentially PTCH storage facilities.
• expansion of support for the LAL Community Asset Transfer programme for
community halls.
• consider disposal of the Fergusson Gallery and William Soutar House.
• establish a shared finance function for the three ALEOs based on a single finance
system.
• move the ALEO contract monitoring/ compliance post to the corporate Strategic
Commissioning and Procurement Team.
• reinstate quarterly monitoring of ALEOs by the Scrutiny and Performance
Committee. 
These proposals were again approved by the Council and work has progressed to action
these, but progress on any structural change (e.g. consolidating corporate functions) has
been limited without the detail required to evidence the necessary changes. 
Further input has been provided by the report in 2023 by Audit Glasgow to support the
financial analysis and options for change element of the ALEO Transformation Review.
The report noted growing financial pressure on the ALEOs, not least as a result of
increasing staff costs without corresponding increase in the PKC service fee. A number of
recommendations were made mainly targeting issues with back office services (finance,
payroll and IT), governance and scrutiny and collaborative working across the three
organisations. 
Page 319 of 396

Page 320

15 
PKC - GENERAL
3 ALEOs
3.1 Introduction
This section provides an overview of each of the three ALEOs, covering: 
• Organisational structure, constitution and governance.
• Assets under management.
• Funding and financial performance. 
3.2 Live Active Leisure (LAL)
3.2.1 Background History
Live Active Leisure (LAL) was founded on 1 October 1965 as Bell's Sports Centre (Perth)
Ltd. The organisation emerged from a collaborative initiative between the Lord Provost of
Perth and the chairman of the Gannochy Trust to enhance public access to sport and
recreational opportunities. Bell's Sports Centre opened in 1968 and quickly became a
regional landmark due to its distinctive laminated timber dome roof. Over the decades,
Bells Sports Centre (Perth) Ltd. evolved into a charitable trust with a strategic focus on
increasing community engagement in physical activity. Key milestones include:
• 1983 - Perth & Kinross Recreational Facilities (PKRF) created when Perth Leisure
Pool (PLP) was built. 
• 2000 – establishment of Perth & Kinross Leisure (PKL). 
• 2010 - development of the Live Active brand and Company rename to Live Active
Leisure (LAL).
By 2015, LAL had become the UK's longest-running leisure trust, commemorating 50
years of service to the Perth and Kinross area.  
Page 320 of 396

Page 321

16 
PKC - GENERAL
As outlined in the company’s charitable purposes, LAL is focussed on:
• the advancement of public participation in sport.
• the provision of recreational facilities, or the organisation of recreational activities,
with the object of improving the conditions of life for the persons for whom the
facilities or activities are primarily intended.
These objectives are designed to benefit children and young people, older adults, people
with disabilities, individuals with health issues, and the general public throughout Perth
and Kinross.
3.2.2 Governance and Management
LAL operates under the oversight of a voluntary Board of Directors comprising
representatives from the local community and Perth & Kinross Council. The Council
retains ownership of the company as its sole member and designates up to three elected
officials to serve on the Board. The company has an independent Chair and two Vice-
Chairs. 
The Senior management is led by the Chief Executive Officer, supported by a senior team
responsible for operational and strategic delivery:
This management team oversees approximately 380 staff and ensures the organisation’s
strategic goals are implemented efficiently across its extensive facility network. The dual-
tiered governance structure ensures robust accountability and effective service delivery.
Page 321 of 396

Page 322

17 
PKC - GENERAL
Figure 3.1: LAL Staff Structure 
Chief Executive
Officer
Head of Business
Development
Service Manager
Physical Activty and
Sport
Wellbeing Manager
Wellbeing Officers
Outdoor Activites
Officer
Sports
Development
Officers
Sport Specific
Development
Officers (Cricket,
Football)
Active Schools
Manageer
Active Schools
Coordinators
Activity
Programming and
Fitness Manager
Programme
Development
Officer
Fitness
Development
Officer
Communications
and Marketing
Manager
Marketing
Coordinators
Head of Corporate
Support Services
HR and Admin
Officer
Training Officer
Board and
Committee
Adminstrator
Head of Finance
Finance Manager
Finance Team
Information and
Business Systems
Coordinator
Business Systems
Assistant
Head of
Operational
Services
Compliance
Manager
Maintenance
Supervisor
Maintenance
Operatives
Operational and
Business Support
Manager
Project Officer Operations
Managers *4
Venue Teams
Page 322 of 396

Page 323

18 
PKC - GENERAL
3.2.3 Assets
LAL administers a diverse portfolio of facilities across the Perth and Kinross region,
comprising:
• Perth Leisure Pool: A flagship aquatic facility offering competitive and leisure
pools, a fitness gym, and wellness amenities.
• Dewars Centre: A multifunctional complex featuring an ice rink, health and fitness
facilities, including gym and studios 
• George Duncan Athletics Arena: An outdoor track and field stadium supporting
both community and competitive athletics.
• Community Campuses: Integrated sports facilities within educational campuses:
o Glenearn Community Campus
o North Inch Community Campus
o Breadalbane Community Campus
o Blairgowrie Community Campus
o Strathearn Community Campus
o Loch Leven Community Campus
• Local Leisure Centres: 
o Live Active Loch Leven
o Live Active Atholl
o Live Active Blairgowrie
• Community Halls:
o Moncrieffe Community Centre
o Scone Public Hall
o Tulloch Community Centre
o Moray Institute
o Aytoun Hall
o Dunning Village Hall
These assets support LAL’s mission to promote health and wellbeing through accessible,
high-quality physical activity environments, serving both urban and rural communities.
Page 323 of 396

Page 324

19 
PKC - GENERAL
3.2.4 Funding Model
Typically, 40% to 50% of LAL's income is derived from Council support, with the
remainder generated through commercial activities and external funding that includes:
• Commercial Revenue: Income streams include user memberships, pay-per-use
fees, facility rentals, instructor-led classes, and on-site retail operations.
• Grant Funding and Strategic Partnerships: Financial support is secured from
organisations such as sportscotland, NHS Tayside, and the Gannochy Trust, which
fund targeted initiatives and capital developments.
• Inclusive Pricing Models: Programmes like the "Compass" membership offer
reduced-cost access to underrepresented and financially vulnerable populations.
Table 3.1, over, provides a summary of the income and expenditure for LAL from
2021/22 to 2025/26
Key points to note include are that LAL is forecast to post a deficit of £270k in 2024/25
which is budgeted to reduce by almost 80% in 2025/26, and the PKC Service Fee is also
expected to be almost £90k lower than in 2023/24. 
Income has been impacted with loss of services from the Bells Centre – it is now starting to
recover with the relocation of gym facilities within the Dewars Centre which accounts for
the projected operating income growth in the 2025/26 budget figure.
Energy costs continue to put pressure on the business with gas and electricity costs
increasing by 152% and 104% respectively. Staff costs have increased substantially from
2021/22 (25%), mainly due to the implementation of Real Living Wage Employer status
and National Insurance increases – staff costs are budgeted to continue to grow in
2025/26. 
Page 324 of 396

Page 325

20 
PKC - GENERAL
Table 3.1: Consolidated Income and Expenditure for LAL 2021/22 to 2025/06 (budget) 
Source: LAL Accounts, LAL Budget papers, PKC Scrutiny Committee Papers
3.2.5 Impact
LAL’s operations generate measurable social and economic impacts, aligned with
broader local authority priorities as summarised below with more details in LAL’s
Achievement and Impact Report (2022-2024):
• Health and Wellbeing Promotion: Evidence-based interventions support
physical rehabilitation, mental wellness, and prevention of lifestyle-related
conditions through structured activity programmes.
• Social Inclusion: Tailored outreach and financial assistance schemes ensure
equitable access to physical activity for marginalised groups, including individuals
in rural areas and those with additional needs.
• Youth Engagement and Development: The Active Schools initiative provides
structured opportunities for children and adolescents to engage in sports,
fostering leadership, confidence, and long-term engagement in physical activity.
• Community Integration: Facilities serve as focal points for community interaction,
supporting volunteerism, club development, and event hosting that reinforce local
identity and cohesion.
Category 2021-22 2022-23 2023-24
2024-25
forecasted
outrun
2025-26
Budget
Income
Operating Income 4,813,639        4,280,447        4,614,463        4,084,433          4,974,630        
Services to PKC 4,645,173        4,653,406        4,771,842        4,706,400          4,683,272        
Grant Funding 959,475           732,142           730,934           780,933             777,877           
Other Income 87,265             204,661           380,155           344,200             231,376           
Income Total 10,505,552   9,870,656     10,497,393   9,915,967       10,667,155   
Expenditure
Cost of Sales 33,053             87,095             71,969             66,071               73,440             
Staff Costs 5,517,887        6,356,638        6,869,628        6,703,754          7,345,063        
Supplies & Services 709,203           896,349           1,005,503        986,219             1,028,228        
Property Costs 3,477,119        2,571,285        2,340,326        2,253,278          2,001,239        
Grants Awarded 125,276           190,962           176,751           177,209             277,877           
Exoenditure Total 9,862,538     10,102,330   10,464,176   10,186,530     10,725,847   
Surplus/Defecit 643,014 -231,673 33,217 -270,563 -58,692
Page 325 of 396

Page 326

21 
PKC - GENERAL
• Local Economic Contribution: Employing over 380 staff and attracting significant
footfall, LAL contributes to job creation, local spending, and regional tourism.
By delivering inclusive, evidence-informed services, Live Active Leisure supports Perth &
Kinross Council’s objectives to reduce health inequalities and foster a culture of active
living. The organisation remains a pivotal stakeholder in regional health, wellbeing, and
community development.
3.2.6 Issues for Consideration
Based on the review of information provided and consultation with LAL Board members
and Leadership Team, there is a number of issues pertinent to the option appraisal work:  
• Rising staff and energy costs, including the move to the Real Living Wage, and now
the increase in Employers’ National Insurance, have added significantly to the
organisation’s costs. 
• LAL has been working with PKC on a Strategic Facilities Review which is looking at
the replacement of Perth Leisure Pool and The Dewars Centre as well as potential
redevelopment and upgrades of other facilities. This process has been ongoing for
some time and led to lack of investment in current facilities.
• Whilst income generation has remained flat, it should be noted that this is with the
backdrop of facility closures at Bells (flooding) and the redevelopment of
Blairgowrie (old venue still open but the infrastructure is old and the offer
declining) representing a significant reduction in available facilities, but LAL is clear
that there is a need to continue to develop commercial income to continue to meet
increasing costs and savings expectations. The improved facility offerings as a
result of the Strategic Asset Review with fewer buildings and improved energy
efficiency will be critical to future sustainability. At present, the proposal will see
the merging of two City Centre sites with a budgeted operating deficit of £1.6m
into one new building (PH20) with a projected operating deficit of £1.2m creating
the opportunity for significant saving.
• LAL staff are not on the same terms and conditions as those in either PTCH or CPK.
LAL is an admitted body for the Local Government Pension Scheme and therefore,
aligning these would result in significant additional costs.    
• LAL works unsocial hours (evenings and weekends) during which some back-office
support is required e.g. IT.
Page 326 of 396

Page 327

22 
PKC - GENERAL
• Shifting LAL into the council would result in loss of non-domestic rates relief on
buildings. 
• There are multiple property arrangements in place from LAL ownership ((Perth
Leisure Pool, Dewars Centre, Live Active Atholl, Live Active Loch Leven and Live
Active Strathearn) to leasing and other management arrangements. This is
complicated to manage and could potentially become more complicated with the
addition of more assets. 
These issues have been taken into account in appraising the proposed options.   
3.3 Culture Perth and Kinross (CPK)
3.3.1 Background History 
Culture Perth and Kinross (CPK) was established in 2016 as an independent charitable
trust to deliver library, museum, archive, and cultural services on behalf of PKC. The
creation of CPK followed a strategic review of cultural service delivery models, with a view
to ensuring long-term sustainability, increasing community engagement, and enabling
access to a broader range of funding opportunities. The organisation was formed by
transferring staff, assets, and responsibilities from PKC into a new charitable entity.
The charitable purposes of CPK include:
• the advancement of education, arts, culture, and heritage.
• the provision of public library services and promotion of reading and literacy.
• the care, preservation, and interpretation of cultural and historical collections.
• the promotion of social inclusion through access to cultural resources and
learning.
CPK’s remit includes management of management of 15 key cultural venues such as Perth
Museum, Perth Art Gallery, the AK Bell Library and a range of community libraries.
3.3.2 Governance and Management 
Culture Perth and Kinross is governed by a Board of Trustees comprising individuals from
a range of professional and community backgrounds, selected for their experience and
Page 327 of 396

Page 328

23 
PKC - GENERAL
expertise in culture, business, education, and community development. Perth & Kinross
Council has representation on the Board.
CPK’s executive leadership is headed by a Chief Executive, supported by a Senior
Management Team which oversees functions including operations, collections, public
programmes, learning, digital development, and income generation. The organisational
structure reflects its dual commitment to service delivery and innovation across heritage,
culture, and library services.
Page 328 of 396

Page 329

24 
PKC - GENERAL
Figure 3.2: CPK Staff Structure 
Library Support
Services Officer 
1FTE
Events 
Co-ordinator
1FTE
Local and
Family History
Officer 1FTE
Programme 
Manager 
1FTE
Libraries
Manager
1FTE
General
Manager
1FTE                                                                           
Snr Opps
Officer 
1 FTE                           
-          
Exhibitions
Assistant
1FTE
Library
Supervisors  
Design and
Publicity Officer 
1FTE                                   
FGIC Technologist
in Residence
1 FTE                                                       
Head of Audiences and Engagement  
1 FTE
Head of Support and Contracts  
1FTE
Head of Museums and Collections  
1FTE                                 
-                            
Collections
Officers  
3 FTE
Exhibitions
Officer
1FTE
Marketing
Officer
1FTE
IT Supervisor
1FTE
Page 329 of 396

Page 330

25 
PKC - GENERAL
3.3.3 Assets 
Culture Perth and Kinross is responsible for the operation and curation of a portfolio of
cultural facilities and collections, including:
• AK Bell Library: The main library and headquarters of CPK, offering extensive
reference and lending services, digital access, and community learning.
• Perth Museum: The new Perth Museum opened its doors on Saturday, 30 March
2024 after a £27 million redevelopment project. This world-class cultural and
heritage attraction highlights the fascinating objects and stories that put Perth and
Kinross at the centre of Scotland’s story. At the heart of the museum sits the Stone
of Destiny, also known as the Stone of Scone, one of Scotland and the UK’s most
significant historical objects. 
• Perth Art Gallery: One of the UK’s oldest collections  featuring works from
influential Scottish artists and now the home of the Fergusson Collection.
• Local Libraries: Operated in communities across Perth and Kinross:
o Blairgowrie Library
o Auchterarder Library
o Breadalbane Community Library
o Kinross Library
o Scone Library
o Strathearn Community Library
o Loch Leven Community Library
o Comrie Library
o Birnam Library
o Pitlochry Library
o Alyth Library.
• Local and Family History Services Offering public access to documents and records
of local significance based in AK Bell Library.
CPK also stewards museum and art collections, all of which are nationally recognised for
their significance. 
Page 330 of 396

Page 331

26 
PKC - GENERAL
3.3.4 Funding Model 
CPK operates on a mixed funding model that includes:
• Annual Service Fee: Provided by Perth & Kinross Council to support core library
and museum operations.
• Earned Income: Derived from commercial activities such as venue hire, retail sales,
events, exhibitions, and café operations.
• Grant Funding: CPK is active in securing funding from national agencies including
Creative Scotland, Museums Galleries Scotland, the National Lottery Heritage
Fund, and others.
• Philanthropy and Sponsorship: Targeted fundraising campaigns and strategic
partnerships support exhibitions, educational projects, and capital developments.
Over 90% of CPK’s income is provided by PKC, with the remainder coming from external
funding sources and some modest earned income. Table 3.2, outlines CPK’s income and
expenditure over the last three years with forecast and budget information for 2024/25
and 2025/26 respectively.
Table 3.2: Consolidated Income and Expenditure for CPK 2021/22 – 2025/26 
Source: CPK Accounts, PKC Scrutiny Committee Papers
The financial pressure on the organisation is evident, with consistent increases in staff
costs, set nationally by COSLA, and in the costs of supplies and services. These have
combined to turn a surplus in 2021/22 into a deficit by 2022/23. The deficit is forecast to
be particularly large in 2024/25 due mainly to a sharp increase in staff costs associated
Category 2021-22 2022-23 2023-24 2024-25
forecasted
outturn
2025-26 Budget
Income
PKC Service Fee 3,178,116           3,219,116          3,392,116       3,919,116            3,995,116            
Donations and Legacies 14,151                22,618               35,632            78,100                 80,000                 
Income from Charitable Activities 35,143                162,691             95,703            194,695               176,840               
Other Income 19,419                54,858               138,779          134,203               138,512               
Total Income 3,246,829        3,459,283       3,662,230    4,326,114         4,390,468         
Expenditure
Staff Costs 2,467,991           2,801,568          3,102,644       3,940,158            3,546,700            
Property Costs 76,490                83,364               81,624            114,480               80,819                 
Supplies and Services 380,360              410,263             426,913          597,610               691,500               
Transport Costs 99,399                95,641               86,354            70,252                 73,466                 
Bank Charges 1,616                  1,184                 1,600              10,925                 15,000                 
Governance Costs 37,099                47,725               52,525            62,529                 55,471                 
Total Expenditure 3,062,955        3,439,745       3,751,660    4,795,954         4,462,956         
Surplus/ Deficit 183,874            19,538             89,430-          469,840-            72,488-               
Page 331 of 396

Page 332

27 
PKC - GENERAL
with the payment of historic back pay and the opening of the New Museum, budgeted to
reduce again in 2025/26. Income other than the PKC Service Fee is modest and there is
limited scope for further income generation when core services are free at the point of
access.  
3.3.5 Impact 
Culture Perth and Kinross delivers wide-ranging cultural, educational, and social benefits
across the region:
• Lifelong Learning and Literacy: Through libraries, digital access points, and
outreach, CPK supports reading, digital inclusion, and learning for all ages.
• Cultural Heritage: The preservation, exhibition, and interpretation of artefacts and
records fosters a strong sense of identity and place.
• Tourism and Economic Development: Cultural venues contribute to the visitor
economy, drawing residents and tourists alike.
• Wellbeing and Social Inclusion: Cultural programming is designed to address
issues of isolation, intergenerational engagement, and community cohesion.
• Digital Innovation: CPK has invested in digital storytelling, collections access, and
virtual programming, expanding its reach and relevance.
Through its blend of cultural stewardship and public service, CPK supports Perth and
Kinross Council’s aims in education, regeneration, and community wellbeing.
3.3.6 Issues for Consideration 
From engagement with CPK’s leadership team, external stakeholders, and review of
organisational data, several key issues have been identified that influence future planning:
• ongoing pressures from inflation and staffing costs have tightened budget
flexibility, even as demand for services increases.
• staff salaries remain tied to local authority increases, but no allowance in staff costs
inflation in the annual PKC grant has led to a (reported) real terms decrease of 48%
in the grant’s value since 2015.
Page 332 of 396

Page 333

28 
PKC - GENERAL
• income generation from commercial activities remains constrained by physical
space and infrastructure limitations in key buildings. Also, the free nature of the
services (libraries, museums) limits the opportunities for income generation.
• collections storage is under significant pressure, with off-site storage needs
competing with access and conservation requirements.
• the redevelopment of Perth City Hall and associated museum development
required significant transitional planning and staffing resource. Reallocation of
staffing across the service was required to ensure the expenditure bottom line
remained unchanged. 
• capital investment is needed to maintain or upgrade community libraries and
ensure digital infrastructure meets public expectations.
• proposed library closures in rural areas led to strong community response and
adverse media attention. The rationale and options for the closures, agreed in the
Review of 2023 (see p12), remain a subject of debate. In February 2025, PKC
reversed this decision for review in 20278. 
• footfall recovery/lending levels are recovering well post-COVID in all facilities with
many facilities now exceeding pre-Covid footfall.
• the opening of the Perth Museum(previously Perth City Hall) in 2024 has
dramatically increased overall visitor figures and resulted in high levels of positive
national media profile.
• the quality of development/engagement work remains high although there are
capacity issues around quantity of activity versus potential demand.
There is scope to develop further the strategic relationship between PKC and CPK with a
joint mission, shared objectives, and potential for shared delivery.
Any structural changes to CPK’s status would need to consider the management of
nationally significant collections and the potential implications for charitable status and
funding eligibility.
These issues have been taken into account in appraising the proposed options.   
Page 333 of 396

Page 334

29 
PKC - GENERAL
3.4 Perth Theatre and Concert Hall (PTCH)
3.4.1 Background History
Horsecross Arts Limited was established in 2006 to run Perth Concert Hall and to refresh
and reposition Perth Theatre, Scotland’s oldest repertory theatre company. 
In 2013, new Articles of Association were adopted whereby Perth and Kinross Council
became the sole member of the company. The charitable objects of the company are to:
• advance education by the encouragement of the performing arts by means of
production, presentation, collection, exhibition, collaboration, education and
training in the performing arts. 
• run arts development and arts education programmes in theatre, music and new
media public art in Perth and elsewhere which will promote and encourage
creativity, skills development, social and personal development, social inclusion
and lifelong learning but only as long as such activities are regarded as charitable
in law.
Horsecross Arts Limited has a wholly owned subsidiary, Horsecross Trading Limited,
established to generate funds to support the parent charity. In 2022, the Trustees took the
decision to conduct all activities under the trading name of Perth Theatre and Concert
Hall (PTCH).   
3.4.2 Governance and Management
PTCH has a Board of 12 Trustees, acting in a voluntary capacity, with fiduciary
responsibility for safeguarding the assets of the charity. Perth and Kinross Council has the
right to appoint up to three Elected Members of the Council to serve on the Board. The
Chair and Vice Chair of PTCH are independent (i.e. not council appointees). Independent
trustees bring a diverse set of skills and experience including performing arts and theatre
management, communications, HR, legal and commercial business. 
Page 334 of 396

Page 335

30 
PKC - GENERAL
Perth and Kinross Council and Creative Scotland can attend the Board meeting as
observers and receive Board papers and minutes. The Board meets at least four times a
year and has a number of Committees which meet to coincide with the cycle of Board
meetings:
• Finance and General Purposes Committee.
• Nominations Committee.
• Business Development Committee.
• People Committee.
PTCH works with Perth and Kinross Council to develop programmes of activity in line with
the organisation’s charitable objectives and the priorities of the Council. Otherwise, Perth
and Kinross Council maintains an arms-length relationship with PTCH (although it does
retain the power to remove Trustees in exceptional circumstances).  
The Executive Team comprises the Director supported by both:
• a Leadership Team which includes the Director, Director of Commercial
Operations, Director of Finance and HR, and Director of External Relations.
• a Senior Management Team which includes the Media Relations Manager, Theatre
General Manager, Head of Learning and Engagement, Head of Technical Services,
Head of Events and Commercial Development and Head of Contemporary,
Classical and Theatre Programming.    
Following a difficult period of poor trading performance, PTCH was placed by Perth and
Kinross Council into ‘Special Measures’ leading to significant changes at Board and Senior
Management levels. This was followed by the Covid-19 pandemic during which the
organisation undertook a wider restructure which led to further changes in staffing
numbers (a significant reduction in overall headcount) and subsequently at Senior
Management and Board levels. 
The period since the pandemic has brought greater stability and a refreshed vision and
approach to programming and wider operations, including growth in commercial income
and fundraising performance as well as increased audiences. 
The senior team was also restructured in 2023 with the deletion of the previous Artistic
Director post, the creation of the new Director of Commercial Operations position, and a
Page 335 of 396

Page 336

31 
PKC - GENERAL
change for the CEO to Director with an enhanced role in artistic programming. This was
done with a view to enabling a new approach to artistic programming.  
The PTCH staff structure is shown below.
Figure 3.3: PTCH Staff Structure 
Source: PTCH
3.4.3 Assets
PTCH manages two properties owned by PKC:
• Perth Theatre: founded in 1900, Perth Theatre reopened in 2017 following an
extensive period of restoration and redevelopment costing approximately £16.6m.
The venue houses a traditional Victorian auditorium (with proscenium arch), new
studio theatre, dedicated community rooms, café, and spacious public areas. 
• Perth Concert Hall: opened in September 2005 following a £12.3m capital build
project, the venue boasts world leading acoustics in its 1,200-capacity auditorium.   
Page 336 of 396

Page 337

32 
PKC - GENERAL
3.4.4 Funding Model
The two principal funders of PTCH are PKC and Creative Scotland. PKC provides PTCH
with annual funding in the form of a service fee (of just under £1m per annum plus an
additional separate payment from the COSLA pay award) governed by a Service Level
Agreement (SLA). The SLA sets out the responsibilities of each party as follows:
• PKC retains responsibility for property maintenance.
• PTCH is required to deliver diverse programme across the performing arts with a
primary focus on music and drama.  
The SLA also specifies a range of Key Performance Indicators (KPIs) that PTCH is required
to deliver, which include measures relating to numbers of performances, audiences,
community and learning activities and participants and commercial activities (mainly
conferences and events). It does not include specific financial targets although the service
fee is reducing by 12% over a three-year period. 
Following a successful application to Creative Scotland’s new multi-year funding
programme, PTCH secured an increase in their annual grant for 2025/26 to c. £736K, an
increase of c. 38%.  
In addition, PTCH also has a strong track record of securing funding from a range of
sources including trusts and foundations with core and project funding from the
Gannochy Trust to support staff costs for community and learning activities. The
organisation has also benefitted from additional funding from PKC for capital works and
to support activities to celebrate the forthcoming 125th year anniversary of the theatre and
20th anniversary of the Concert Hall. 
Table 3.3 provides a summary of the income and expenditure for PTCH over the last
three years with forecast data for 2024/25 and the budget for 2025/26. 
Page 337 of 396

Page 338

33 
PKC - GENERAL
Table 3.3: Consolidated Income and Expenditure for PTCH 2021/22 to 2025/06
(budget) 
Source: Integratis/ EKOS analysis of PTCH data
Note 1: Other grant income includes new funding from Trusts, including from Garlfield Weston, Hugh Fraser
Foundation and Wolfson Foundation and a significant uplift in 2025/26 from the Gannochy Trust
Note 2: Breakdown of governance costs not available for 2024/25 and 2025/26
A number of points are worth noting:
• 2021/22 cannot be considered a typical year as this was still impacted by the
pandemic with reduced levels of performance and trading activity offset by grant
income relating to Covid emergency funding (PTCH was successful in securing
funding support through the pandemic).  
• there has been a reduction in grant income and income from donations and
legacies but 2021/22 is skewed by the Covid emergency funding. Funding from
Creative Scotland increases in 2025/26.  
• trading income from charitable and commercial activities has increased indicating
good recovery post-Covid and renewed emphasis on income generation. Income
from productions and performances has shown consistent growth in line with the
organisation’s plans.
• staff costs (2024/25 forecast) have increased by almost 60% since 2021/22 but this
again reflects the downturn in activity with the pandemic. The increase between
2023/24 and 2024/25 was 15%. However, PTCH reports that its total staff is around
two thirds pre-pandemic levels. 
Category 2021-22 2022-23 2023-24 2024-25
forecasted
outturn
2025-26
Budget
Grant Income
PKC Service Fee 1,062,480           1,062,480     1,062,480    1,018,730           1,015,880         
Creative Scotland Revenue 553,481              533,333        533,333       533,445              736,046            
Other Grant/ Donations Income1 1,121,822           613,214        290,997       298,220              366,000            
Total Grant Income 2,737,783        2,209,027  1,886,810  1,850,395         2,117,926      
Production and Performance Income 856,113              2,193,913     2,069,520    2,352,475           2,361,606         
Creative Learning and Community Projects 21,888                39,900          37,524         61,458                55,000              
Other retail, merchandising and Commission income 190,166              486,819        490,660       453,321              381,722            
Sponsorship income -                     -                -               66,546                150,000            
Company Catering Sales 215,985              678,592        730,711       840,597              952,857            
Total Earned Income 1,284,152        3,399,224  3,328,415  3,774,397         3,901,185      
Total Income 4,021,935        5,608,251  5,215,225  5,624,792         6,019,111      
Expenditure
Staff Costs 1,666,089           2,162,949     2,312,003    2,650,993           2,809,708         
Governance Costs2 70,002                102,572        143,848       n/a n/a
Other Operating Costs 1,975,183           3,182,882     2,986,490    3,223,148           3,387,998         
Total Expenditure 3,711,274        5,448,403  5,442,341  5,874,141         6,197,706      
Suplus/ Deficit 310,661           159,848      227,116-     249,349-            178,595-         
Page 338 of 396

Page 339

34 
PKC - GENERAL
• The organisation posted a deficit in 2023/24 following two years in surplus. This is
down to increased costs, particularly staffing costs. This is partly attributable to the
organisation moving to the Real Living Wage as part of the conditions for the
Creative Scotland multi-year funding.  
PTCH set a target to increase income generation to address the 2023/24 deficit position.
However, despite exceeding this income target, the organisation is still forecasting a
deficit in 2024/25 due to increases in staff costs (as a result of the Real Living Wage) and
energy costs along with ongoing challenges in securing trusts and foundations income
(which is not specific to PTCH but is rather a national trend). 
Despite growing audiences, PTCH still faces the challenge of increasing ticket income
through the sale of full price tickets rather than concessions. However, this needs to be
balanced against the organisation’s community responsibilities and its contribution to
Council priorities.  
3.4.5 Impact
2023/24 was a record year for PTCH:
• over 135,000 tickets were sold for 510 performances spanning classical and
contemporary music, theatre, comedy, dance and film.
• 43% of bookers were first time attendees and 14% were from areas of high
deprivation in Scotland (defined using the Scottish Index of Multiple Deprivation’s
20% most deprived datazones).
• there were 19,631 visitors to conferences and events and over 10,000 participants
in learning and engagement work. 
• there were also almost 35,000 other building users (café, meetings rooms,
exhibition spaces etc). 
PTCH report that these activities contributed to the organisation generating a direct
economic impact of £16.9m in 2023/24. For Perth and Kinross Council this means that
each £1 of investment in PTCH returns more than £16 in economic impact for the region.    
Page 339 of 396

Page 340

35 
PKC - GENERAL
3.4.6  Issues for Consideration
Based on the review of information provided and consultation with PTCH Board members
and Leadership Team, there is a number of issues pertinent to the option appraisal work:  
• PTCH is differentiated from comparable local authority performing arts venues in
two principal ways: it is a producing theatre and not solely a receiving house; and
the combination of a producing theatre and concert hall is almost unique in the
UK. 
• the organisation has worked hard to recover from both the pandemic and its pre-
Covid difficulties and is now working to a clear plan to revitalise the artistic and
community programme, grow commercial and other income and develop a
sustainable model for the two venues.
• extensive restructuring during and immediately after the Covid period significantly
reduced staff headcount and resulted in a leaner and more focussed organisation. 
• more recently, rising staff and energy costs, including the move to the Real Living
Wage, and now the increase in Employers’ National Insurance, have added
significantly to the organisation’s costs. These additional costs effectively negated
the impact of the recent income growth on the organisation’s deficit position. 
• there are capital investment needs at both venues, particularly for the Concert Hall,
and PKC has committed an initial £2.8m to these works. More will be required in
due course and PTCH can raise capital funding from sources not available to the
council.
• income growth has been good, but PTCH is clear that there is a need to continue
to develop commercial income through conferences and events, full price ticket
sales and trusts and foundations. This is the primary focus for PTCH in working with
PKC to reduce the overall level of subsidy required.  
• PTCH staff are not on the same terms and conditions as those in either LAL or CPK.
PTCH is not an admitted body for the Local Government Pension Scheme (CPK
and LAL are). Aligning these would result in significant additional costs to PTCH,
although this must be balanced against the risks of equal pay claims. 
• PTCH has some specific needs in relation to support services such as HR and
finance as the organisation works with a large freelance labour pool which requires
different contractual conditions and prompt payment terms. Similarly, many
concert promoters require payment within 48 hours. 
Page 340 of 396

Page 341

36 
PKC - GENERAL
• PTCH has external HR support and a different finance system (Xero) to those used
by LAL and CPK. Both are considered to be very lean operations (there are three
people in the Finance team).  
• the finance team at PTCH has developed specialist expertise in securing Theatre
Tax Relief, an important source of additional income. 
• PTCH works unsocial hours (evenings and weekends) during which some back-
office support could be required e.g. IT.
• shifting PTCH into the council could risk the loss of Creative Scotland funding (or
require a re-application). This is an existential risk to the business. This is also a risk
under options which result in the creation of a new ALEO. 
• similarly, shifting PTCH into the council would result in loss of non-domestic rates
relief on the two buildings. 
• there are some concerns that merging with leisure services, museums and libraries
could risk loss of expertise specific to the PTCH business (for example, through the
creation of a single board or reduction in senior management).
• there are also concerns about options which could result in dilution of the PTCH
brand amongst the community – something that the organisation has worked hard
to establish (including with the move to the PTCH trading name). 
• issues were raised about the current level of reporting burden and the amount of
management time that this requires. 
These issues have been taken into account in appraising the proposed options.   
Page 341 of 396

Page 342

37 
PKC - GENERAL
3.5 Consolidated Overview
We have collated the finances for the three ALEOs together to provide a consolidated
picture of financial performance. This is shown in Table 3.4, over. 
In 2023/24, the combined deficit of the three ALEOs was just under £380K with this
forecast to rise to almost £1m in 2024/25 before reducing again in 2025/26 to c. £300K.
At the same time, the total management fee paid by PKC is forecast to increase slightly for
CPK while reducing for the other two ALEOs.
While all are forecast to increase their deficit in 2024/25, this is particularly marked for
CPK and to a slightly lesser extent LAL. Income at CPK and PTCH is forecast to rise in
2024/25 while it reduces at LAL. However, income growth for CPK and for PTCH is offset
by a larger rise in expenditure, while costs are forecast to reduce at LAL.   
While the 2025/26 figures estimate some improvement, these are budget figures only at
this stage and are still predicated on significant increases in income for LAL and PTCH. For
CPK, a modest increase in the PKC management fee is budgeted. 
This suggests that while the overall financial picture is not getting significantly worse,
substantial improvement (i.e. reduction in the level of subsidy required) appears some
way off. 
It is also worth noting here that PKC has expressed some concerns regarding the
differences in staff terms and conditions across the three ALEOs, particularly in relation to
the potential for equal pay claims. However, this is not a new risk and to date there have
been no claims raised in respect of either LAL or PTCH (CPK is now aligned to PKC). 
Page 342 of 396

Page 343

38 
PKC - GENERAL
Table 3.4: Financial Summary all ALEOs 2021/22 to 2025/26   
Cost Centre Organisation 2021-22 2022-23 2023-24 2024-25 forecasted outturn 2025-26 Budget
Income Live Active Leisure £10,505,552 £9,870,656 £10,497,393 £9,915,967 £10,667,155
Income Culture Perth & Kinross £3,246,829 £3,459,283 £3,662,230 £4,326,114 £4,390,468
Income Perth Theatre & Concert Hall £4,021,935 £5,608,251 £5,215,225 £5,624,792 £6,019,111
Income Total £17,774,316 £18,938,190 £19,374,848 £19,866,873 £21,076,734
Expenditure Live Active Leisure £9,862,538 £10,102,330 £10,464,176 £10,186,530 £10,725,847
Expenditure Culture Perth & Kinross £3,062,955 £3,439,745 £3,751,660 £4,795,954 £4,462,956
Expenditure Perth Theatre & Concert Hall £3,711,274 £5,448,403 £5,442,341 £5,874,141 £6,197,706
Expenditure £16,636,767 £18,990,478 £19,658,177 £20,856,625 £21,386,509
Net Expenditure Live Active Leisure -£643,014 £231,673 -£33,217 £270,563 £58,692
Net Expenditure Culture Perth & Kinross -£183,874 -£19,538 £89,430 £469,840 £72,488
Net Expenditure Perth Theatre & Concert Hall -£310,661 -£159,848 £227,116 £249,349 £178,595
Net Expenditure Total -£1,137,549 £52,287 £283,329 £989,752 £309,775
Management Fee Live Active Leisure £4,645,173 £4,653,406 £4,771,842 £4,706,400 £4,683,272
Management Fee Culture Perth & Kinross £3,178,116 £3,219,116 £3,392,116 £3,919,116 £3,995,116
Management Fee Perth Theatre & Concert Hall £1,062,480 £1,062,480 £1,062,480 £1,018,730 £1,015,880
Management Fee Total £8,885,769 £8,935,002 £9,226,438 £9,644,246 £9,694,268
Page 343 of 396

Page 344

39 
PKC - GENERAL
4 Options
4.1 Introduction
Through the previous work on the ALEO Review, a number of possible structural options
have emerged through which the services provided by the three ALEOs could be
delivered. These were set out in the brief for the current appraisal. 
Here, each option is outlined in more detail, with a high-level summary of the pros, cons
and any specific issues for consideration raised with each option. Further appraisal of
each of the options is provided in Section 5. 
The options are as follows:
• Option 1: Bring all ALEOs in house to PKC.
• Option 2: Bring some ALEO services in house (e.g. consolidation of corporate
services from ALEOs delivered by PKC) and ALEOs retain own identity / library
services brought back into PKC.
• Option 3: Create one new ALEO / two new ALEOs – streamlining corporate and
back office services.
• Option 4: Create one ALEO for culture and sport and considering possible
change of status for Perth Theatre and Concert Hall.
4.2 Option 1: In House
Under Option 1, all services currently delivered by the three ALEOs would be delivered
instead by PKC directly. The three ALEOs would then be wound up and closed. This
would require the transfer of staff from each of the three ALEOs into the Council (under
TUPE regulations) and would also likely require equalisation of staff Terms and Conditions
in line with the Council. This would add to the total staff costs but would mitigate the risks
of equal pay claims. Also, a move to a single delivery structure would create opportunities
for some rationalisation of staff positions achieving savings. There would also be
opportunities to move support services such as IT onto a single system within PKC. These
issues are considered in more detail in the appraisal section that follows. 
Page 344 of 396

Page 345

40 
PKC - GENERAL
Other issues raised by this option are:
• A move to Council delivery would result in the loss of the non-domestic rates that
the ALEOs currently receive on the facilities under management. This could add as
much as £2.7m to combined annual costs (not all ALEOs have full rates relief).  
• Councils cannot access the same range of external funding available to ALEOs,
including support from trusts and foundations. There is also some uncertainty
about what this option might mean for the multi-year funding support that PTCH
receives from Creative Scotland. Our current understanding is that Creative
Scotland would not automatically remove the funding as it is based on delivery of
agreed outputs and outcomes rather than the legal entity that delivers. However,
this does remain a risk for the future.
• The migration of existing systems across the three ALEOs into a single structure
has the virtue of aligning activity to existing Council systems, but could also be
complex (and potentially disruptive and costly) given that each ALEO operates
different systems for finance and IT.  
• In relation to IT in particular, the costs of licences are considerably higher for PKC
than for the ALEOs as a result of their charitable status. This is likely to add
significant cost as well as time to support a migration to new systems.
• It could be argued that full control by the Council might make property
rationalisation more straightforward, but it is not clear that this is the case as the
council already has decision making authority on any closures. 
• While key staff could be retained (via TUPE transfer to PKC) bringing all services
into the Council would lose the expertise on each of the ALEO Boards. 
4.3 Option 2: Some Services In House
Option 2 would involve the Council taking some services back in house – including
corporate support services such as finance, IT and HR (it already retains property
management except for the venues that are owned by LAL) and libraries. The rationale for
this is twofold:
• Libraries are community services that may be better aligned with other community
focussed provision within the Council.
Page 345 of 396

Page 346

41 
PKC - GENERAL
• The consolidation of corporate services offers opportunities for rationalisation via
economies of scale. 
While this option would be less disruptive and less complex than a full transfer of all
services into PKC, it does raise some of the same issues as Option 1 regarding the
consolidation of corporate services and systems. It would also require that terms and
conditions be equalised for affected staff.
4.4 Option 3: One/ Two ALEOs
This option breaks down into two ‘sub-options’ as explained below. 
4.4.1 Option 3a: One ALEO
Under Option 3a, the three existing ALEOs would be merged into a single new
organisation also with ALEO status. There is a risk here that, following the Barclay Review
of Non-Domestic Rates in 2017, a new ALEO would not be eligible for rates relief.
However, as the assets in question are already under ALEO management this may be
something of a grey area and would require specialist advice. For now, we have assumed
that the new body would benefit from rates relief. 
Other issues to be considered include:
• The merger of the three organisations would require equalisation of staff terms
and conditions, increasing the total staff costs (but reducing the risk of equal pay
claims). 
• Economies of scale should be possible via streamlining of corporate services and
workforce planning. While in theory senior management positions could be
rationalised, each service area will still require the appropriate expertise at senior
level, plus the new organisation would need an overall CEO.  Some rationalisation
may be possible in corporate functions such as finance, HR and business
development. 
• ALEO status should enable a new organisation to access funding sources not
available to local authorities.  
• Strong income generating services (e.g. health and fitness) could help cross-
subsidise those that generate less income (e.g. libraries, museum). 
Page 346 of 396

Page 347

42 
PKC - GENERAL
• The three ALEOs are each operating quite different businesses and business
models, and the strategic coherence of a single merged organisation is not always
clear, although there are precedents from elsewhere.  
4.4.2   Option 3b: Two ALEOs
With Option 3b, two different models are possible, as follows:
• Merger of CPK and PTCH to create a new Cultural ALEO, with LAL remaining as it
is.
• Merger of LAL and CPK with PTCH remaining as it is.  
The first has a degree of strategic rationale as both are cultural ALEOs and the museum,
art gallery, theatre and concert hall are all key assets serving both the communities of
Perth and Kinross and the wider visitor market. The rationale to bring together the
museum, art gallery and libraries with leisure services is arguably less clear although as
noted above, libraries and leisure services both have a very strong community focus (the
other services do too but also have a role in driving the visitor economy of the region). 
In the appraisal, we have focussed more on the second of the two models above on the
basis that LAL and CPK are more closely aligned in relation to staff terms and conditions.
The assumption is that corporate services (finance, HR, IT etc) would be provided by the
new ALEO on behalf both of itself and PTCH.  
However, this model still raises some issues:
• There is again an issue with different staff terms and conditions, albeit pensions are
aligned.
• There may also be an issue with the extent to which trusts and foundations which
already support more than one of the ALEOs (e.g. Gannochy Trust) would continue
to support at the same level if organisations were merged. 
• Under this model, there could be scope for some economies of scale in corporate
support services and staffing but these would be smaller than in a larger merged
organisation.
• CPK and LAL have different support needs in areas like finance and HR (LAL
operates out of hours, for example) and they use different systems – the same is
also true for PTCH.
Page 347 of 396

Page 348

43 
PKC - GENERAL
• There is less strategic coherence in this option than in a merger of CPK and PTCH. 
4.5 Option 4: Culture and Sport ALEO and
change in status for PTCH
Option 4 brings together CPK and LAL and proposes a change in status for PTCH such
that it becomes an independent charity rather than a Council-owned ALEO. This is similar,
for example, to the status of the Royal Lyceum Theatre in Edinburgh which is an
independent charity operating a council-owned building (and in receipt of funding
support from the local authority).  
This option aligns PTCH more with other producing theatres in Scotland (none are ALEOs)
and opens up the possibility of funding from some trusts that do not typically support
ALEOs (the Robertson Trust would be one important example).  
The creation of a culture and sport ALEO, as discussed above, has some precedent across
Scotland (Glasgow, Highland and Dundee all have culture and sport ALEOs) and should
offer some potential for economies of scale in staffing and corporate services functions.
However, issues with differing staff terms and conditions are still present, and LAL and
CPK operate different systems for financial management and bookings. 
It is possible too that bringing leisure assets, community halls and libraries all under a
single delivery structure could open up further opportunities for the development of
consolidated community facilities (some of which have already been considered), which is
consistent with the direction of travel for PKC and indeed for councils across Scotland. 
Page 348 of 396

Page 349

44 
PKC - GENERAL
5 Appraisal
5.1 Introduction
While the appraisal is designed, to some extent, to test the potential to achieve financial
efficiencies through the different structural options, it is important that a broader
approach is taken that considers other less easily quantified factors. With this in mind, the
appraisal has been conducted in two stages:
• Each of the options was set out in an organogram format and a financial model
created for each. This took account of costs and income (as provided by each of
the ALEOs) and identified potential savings that might be realised through staff
and other operational efficiencies. A supplementary note providing more detail is
included at Appendix A. 
• Each option was then assessed against a set of wider criteria by awarding each a
score between 1 and 10 (with 10 being most positive).   
5.2 Financial Appraisal
This section considers the financial impact of the options being considered and is based
on information available at the time of writing. Therefore, all figures detailed should be
taken as indicative rather than definitive.
For the purposes of the analysis, we have split Option 2 into Option 2a: Bring corporate
services in-house and Option 2b: Bring corporate services and Library services in-house.
Similarly, for Option 3 we have set out Option 3a: Create a single new ALEO and Option
3b: Create two new ALEOs. As such, six options have been appraised:
• Option 1: Bring all ALEOs in house to PKC.
• Option 2a: ALEO Corporate Services delivered by PKC and ALEOs retain own
identity 
• Option 2b: ALEO Corporate Services delivered by PKC and Library services
brought back into PKC.
• Option 3a: Create one new ALEO, bringing together all three ALEOs into a single
organisation.
Page 349 of 396

Page 350

45 
PKC - GENERAL
• Option 3b: Two ALEOs – one bringing together LAL and CPK with PTCH
remaining as it is. 
• Option 4: Create one ALEO for culture and sport and considering possible
change of status for Perth Theatre and Concert Hall.
In terms of potential savings/additional costs, we have based this against the current level
of investment made by PKC in terms of management fee currently being paid. 
The assumptions and calculations used to estimate savings are set out below and cover: 
• Senior Management realignment 
• Alignment of Terms and Conditions
• Non-domestic rates
• Governance costs
Senior Management Realignment
The savings under each option achieved by senior management realignment are detailed
below. 
Terms and Conditions
For all of the options we have assumed that affected staff would be brought in line with
PKC terms and conditions as follows:
• Option 1: all ALEO staff TUPE into PKC with Ts and Cs aligned to PKC
• Option 2a: ALEO Corporate Services staff TUPE into PKC with Ts and Cs aligned
to PKC
• Option 2b: ALEO Corporate Services staff and CPK Library staff TUPE into PKC
with Ts and Cs aligned to PKC
• Option 3a: All ALEO staff aligned to PKC Ts and Cs
• Option 3b: Ts and Cs for LAL and CPK staff aligned to PKC (in line with CPK) and
PTCH remains unchanged
• Option 4: Ts and Cs for LAL and CPK staff aligned to PKC (in line with CPK) and
PTCH remains unchanged.   
For these purposes we have made an assumption of uplifting relevant salaries (and
pensions) from LAL and PTCH by 8% which is the current difference between LAL and
Page 350 of 396

Page 351

46 
PKC - GENERAL
CPK salaries. Where positions have been identified as not being required, we have
calculated potential savings based on current salary being paid by the relevant
organisation.
Non-domestic rates
The figures here are the assumed loss of NDR savings that are currently being achieved
by the ALEO’s. In Option 1 as the proposal is that all ALEO’s be brought in-house, we
have assumed that all NDR savings would be lost. The level of savings has been based on
information obtained via the assessor's office and where that information was not readily
available (libraries and town halls) we have assumed costs based on similar sized venues.
In Option 2b the NDR for library properties would be lost. 
None of the other options have implications for NDR as assets remain under charitable
management. 
Governance Costs
Governance costs savings have been based on current costs incurred by each
organisation in relation to accountancy and audit fees, legal and professional fees and
irrecoverable VAT. Assumptions are as follows:
• Option 1: all governance costs saved – governance within PKC
• Option 2a: no governance savings
• Option 2b: no governance savings
• Option 3a: savings on the basis of consolidated requirement (based on loss of
current CPK and PTCH Costs)
• Option 3b: some savings based on loss of CPK costs
• Option 4: some savings based on loss of CPK costs  
Page 351 of 396

Page 352

47 
PKC - GENERAL
5.2.1 Current Model (Baseline Position)
Currently the combined Senior Management structures are as set out in Table 5.1 (below)
and Figure 5.1 (over) and cost £840,491 per annum.
Table 5.1: Senior Management Structure (current)
Live Active Leisure  Culture Perth &
Kinross 
Perth Theatre and Concert
Hall
Position FTE Position  FTE Position  FTE
Chief Executive Officer 1 Chief Executive 1 Director 1
Head of Business
Development
1 Head of
Audiences and
Learning
1 Director of External
Relations (0.8)
0.8
Head of Support
Services
1 Head of Museums
and Collections
1 Director of Commercial
Operations
1
Head of Finance 1 Head of
Operations and
Support Services
1 Director of Finance and
HR (0.8)
0.8
Head of Operational
Services
1 Senior Finance
Officer
1 Finance Manager 1
Total 5  5  4.6
Page 352 of 396

Page 353

48 
PKC - GENERAL
Figure 1: Current Senior Management Structures – all three ALEOs 
CEO LAL
Head of Business
Development
Head of Corporate
Support Services Head of Finance
Head of
Operational
Services
CE CPK
Senior Finance
Officer
Head of
Audiences &
Engagement
Head of
Community
Support Services
Head of Museums
and Collections
Director PTCH
Director of
External Relations
Director of
Commercial
Operations
Director of
Finance & HR
Finance Manager
Page 353 of 396

Page 354

49 
PKC - GENERAL
5.2.2 Option 1: Bring all current ALEOs in house to PKC
This would see the disbandment of the current three ALEOs and the staff and services
being merged into a relevant Council department. Table 5.1 below summarises the
financial impact of this option. In assessing this option, we have made the following
assumption:
• There would be a reduction in Senior Management positions through some form
of redundancy process.
• Staff terms and conditions would be brought in line with those of PKC. We have
assumed an 8% increase for this purpose, as noted above.
• Current levels of income generation would be maintained including donations and
grant funding, although it should be noted that an in-house model would put
some funding at risk. As a result, the cost to PKC for this option could be higher
than shown below.
The level of staff savings is based on the assumption that the current number of Senior
Positions within the ALEOs would not be required therefore generating potential savings.
The assumption is that a combined Senior structure would be created that would oversee
the running of the services that are currently provided by the 3 ALEOs – Table 5.2. 
Table 5.2: Option 1 Senior Management Structure (within PKC)
Proposed Combined Structure 
Position FTE
Senior Service Manager 1
Lead Manager of Ops & Service Delivery 1
Lead Manager of Business Dev & Partnerships 1
Lead Manager of Finance & Corporate Services 1
Lead Manager of Programmes & Service Development 1
Total 5
The revised Senior Management Structure for the services if brought within PKC is
illustrated in Figure 5.2, over. We have assumed that the tier below would include service
specific expertise.  
Page 354 of 396

Page 355

50 
PKC - GENERAL
Figure 5.2: Option 1 - Revised Senior Management Structures (within PKC) 
Senior Service
Manager
Lead Manager of
Ops & Service
Delivery
Lead Manager of
Business Dev &
Partnerships
Lead Manager of
Finance &
Corporate Services
Lead Manager of
Programs & Service
Development
Page 355 of 396

Page 356

51 
PKC - GENERAL
One-off costs for implementation (including redundancy costs, increased software licence
costs and any system integration costs) would be over and above the figures shown.
Table 5.3: Option 1 – In House Delivery
Category of Expenditure Savings/ Costs
Senior Management re-alignment -£481,774
Terms & Conditions consolidation £750,442
Governance Costs -£400,257
Non Domestic Rates £2,735,300
Annual Additional Cost/Saving to PKC £2,608,711 
As shown, this option would bring significant additional costs to PKC mainly as a result of
the loss of the current non domestic rates relief. Alignment of staff terms and conditions
also adds considerable cost.  
5.2.3 Option 2a: Bring Corporate Services in house to PKC
This option looks at the feasibility of taking away the current corporate services function of
each ALEO and having them delivered by PKC under a services agreement. 
This appraisal assumes that all corporate services would be provided by PKC and that any
relevant staff would be TUPE transferred from the ALEOs to PKC. The potential savings
under Senior Management re-alignment works on the basis that some of the current
Senior positions would not be required as equivalents would already be in place at PKC.
Table 5.4 summarises the positions identified as being surplus and therefore generating
the potential saving. The revised Senior Management Structures within the ALEOs are
summarised in Figure 5.3, over. 
Table 5.4: Option 2a – Surplus Management Positions
Live Active Leisure  Culture Perth &
Kinross 
Perth Theatre and Concert
Hall
Position FTE Position  FTE Position  FTE
Head of Finance 1 Senior Finance
Officer
1 Director of Finance & HR
(0.8)
0.8    
Finance Manager 1
Total 1  1  1.8
Page 356 of 396

Page 357

52 
PKC - GENERAL
Figure 5.3: Option 2a - Senior Management Structures in all three ALEOs 
CEO LAL
Head of
Business
Development
Head of
Corporate
Support Services
Head of
Operational
Services
CE CPK
Head of
Audiences &
Engagement
Head of
Community
Support Services
Head of
Museums and
Collections
Director PTCH
Director of
External
Relations
Director of
Commercial
Operations
Page 357 of 396

Page 358

53 
PKC - GENERAL
The financial assessment is summarised in Table 5.5 below. The modelling assumes that
terms and conditions for the staff that are transferred to PKC are then aligned to PKC.
Other costs and income remain as current estimates. It does not include potential hidden
cost including redundancy costs, software licences and system integration. 
Table 5.5: Option 2a – Corporate Services In House
Category of Expenditure Savings/ Costs
Senior Management re-alignment -£206,349
Terms & Conditions consolidation £14,542
Governance Costs £0
Annual Additional Cost/Saving to PKC -£191,807
As shown above, this option has the potential to achieve a modest saving. However, it
should be noted that currently there is no standard approach to systems and processes
across the ALEOs in terms of software and each operating model has its own specific
requirements which may be hard to replicate in a single support service from PKC. It was
also reported that CPK was previously asked to move away from PKC finance support as
they were unable to meet day to day operating needs, 
5.2.4 Option 2b: Bring Corporate Services and Library Services in
house to PKC
This option considers the transfer of Library Services into PKC alongside a central
corporate services function. 
This appraisal assumes that all corporate and library services are brought in-house to PKC
and that any relevant staff would be TUPE transferred back to PKC (with terms and
conditions aligned to PKC – see below). The potential savings under Senior Management
re-alignment works on the basis that some of the current Senior positions would not be
required as equivalents would already be in place at PKC. Table 5.6, over, summarises
the positions identified as being surplus and therefore generating the potential saving. 
NB: The assumption gives the same level of management savings as 2a as the specialist
Senior Library positions would still be required to deliver the service.  
Page 358 of 396

Page 359

54 
PKC - GENERAL
Table 5.6: Option 2b – Surplus Management Positions
Live Active Leisure  Culture Perth &
Kinross 
Perth Theatre and Concert
Hall
Position FTE Position  FTE Position  FTE
Head of Finance 1 Senior Finance
Officer
1 Director of Finance & HR
(0.8)
0.8    
Finance Manager 1
Total 1  1  1.8
The revised management structures within the ALEOs are summarised in Figure 5.4,
over. 
Page 359 of 396

Page 360

55 
PKC - GENERAL
Figure 5.4: Option 2b - Senior Management Structures in all three ALEOs 
CEO LAL
Head of
Business
Development
Head of
Corporate
Support Services
Head of
Operational
Services
CE CPK
Head of
Audiences &
Engagement
Head of
Community
Support Services
Head of
Museums and
Collections
Director PTCH
Director of
External
Relations
Director of
Commercial
Operations
Page 360 of 396

Page 361

56 
PKC - GENERAL
The financial impact is summarised in Table 5.7 below. 
Table 5.7: Option 2b – Corporate Services and Libraries In House
Category of Expenditure Savings/ Costs
Senior Management re-alignment -£260,349
Terms & Conditions consolidation £14,542
Governance Costs £0
Non Domestic Rates £606,800
Annual Additional Cost/Saving to PKC £414,993
This option could mean a significant additional cost to PKC driven by the loss of non-
domestic rates savings across the library estate. As with Option 2a, there would also be
the challenge (and hidden costs) of bringing together the various approaches to systems
and processes across the ALEOs. 
5.2.5 Option 3a: Create a single new ALEO
This option looks at creating a new body to run all cultural, library and sports and leisure
services on behalf of PKC. 
Similar to Option 1, this assumes that a merger of the 3 ALEOs into one would only
require a single Senior Management Team to operate. Table 5.8 summarises the
proposed Senior Management Team for a new organisation. This is illustrated in Figure
5.5, over.
Table 5.8: Option 3a – Proposed Management Structure
Proposed Combined Structure 
Position FTE
Chief Executive Officer 1
Executive Director of Ops & Service Delivery 1
Director of Business Dev & Partnerships 1
Director of Finance & Corporate Services 1
Director of Programmes & Service Development 1
Director of Ops & Service Delivery 1
Total 6
Page 361 of 396

Page 362

57 
PKC - GENERAL
Figure 5.5: Option 3a - Senior Management Structure for single ALEO 
Chief Executive
Officer
Director of Business
Development &
Partnerships
Director of Finance
& Corporate
Services
Director of
Programs & Service
Development
Director of
Operations &
Service Delivery
Executive Director
Operations &
Service Delivery
Page 362 of 396

Page 363

58 
PKC - GENERAL
The financial impacts of this option are summarised in Table 5.9 below. 
Table 5.9: Option 3a – Single new ALEO
Category of Expenditure Savings/ Costs
Senior Management re-alignment -£284,768
Terms & Conditions consolidation £747,186
Governance Costs -£193,999
Non Domestic Rates £0
Annual Additional Cost/Saving to PKC £268,419 
Again, this option represents an additional financial burden to PKC mainly due to the
assumption that Terms & Conditions of employment would require to be standardised. As
with the other options considered, there is no allowance for one-off costs of
implementation to achieve this. Consideration would also have to be given to the
complexity of bringing together three diverse organisations into one and the cultural
challenges that this would represent.
5.2.6 Option 3b: Two ALEOs
This option proposes a shift from the current three ALEOs to two bodies. This assessment
has assumed that one body would be the merger of LAL and CPK due to them being
more closely aligned in terms of T&C’s. The second body would leave PTCH as it currently
operates. 
This option looks at the merging of LAL and CPK into a new entity and the retaining of
PTAH but in a more streamlined manner with corporate services being provided by the
larger entity.
Table 5.10, over, summarises the proposed Senior Management Structures for the 2
entities.  
Page 363 of 396

Page 364

59 
PKC - GENERAL
Table 5.10: Option 3b Senior Management Structures
New ALEO  Perth Theatre and Concert Hall
Position FTE Position  FTE
Chief Executive Officer 1 Director 1
Head of Business Development 1 Director of External Relations (0.8) 0.8
Head of Support Services 1 Director of Commercial Operations 1
Head of Finance 1  
Head of Operational Services 1  
Head of Audiences & Learning 1  
Head of Heritage & Culture 1  
Total 7  2.8
The new structure is illustrated in Figure 5.6, over. 
Page 364 of 396

Page 365

60 
PKC - GENERAL
Figure 5.6: Option 3b - Senior Management Structure for two ALEOs 
CEO
Head of
Business
Development
Head of  Support
Services Head of Finance
Head of
Operational
Services
Head of
Audiences &
Learning
Head of Heritage
& Culture
Director PTCH
Director of
External
Relations
Director of
Commercial
Operations
Page 365 of 396

Page 366

61 
PKC - GENERAL
The financial impact is summarised in Table 5.11 below.
Table 5.11: Option 3b – Two ALEOs
Category of Expenditure Savings/ Costs
Senior Management re-alignment -£284,768
Terms & Conditions consolidation £747,181
Governance Costs -£52,525
Non Domestic Rates £0
Annual Additional Cost/Saving to PKC £371,100
Again, consideration needs to be given to the additional one-off costs that would be
required for this option to be delivered. In addition, the forecast shows a significant
additional financial burden to PKC, again driven by the alignment of terms and conditions. 
5.2.7 Option 4: New Sport and Culture ALEO and change of status for
PTCH
This option would mean that the Council would have a single ALEO representing Sport,
Culture, Libraries and Museums and re-imagine the current operating model of PTCH to
no longer be an ALEO but an alternative type of supported body (we have assumed that
this would be an independent charity). In this option, PTHC terms and conditions would
remain as they are. 
Table 5.12 below summarises the proposed Senior structures. Figure 5.7, over, displays
the structure as an organogram. 
Table 8: Option 4 Senior Management Structures
New ALEO  Perth Theatre and Concert Hall
Position FTE Position  FTE
Chief Executive Officer 1 Director 1
Head of Business Development 1 Director of External Relations (0.8) 0.8
Head of Support Services 1 Director of Commercial Operations 1
Head of Finance 1 Director of Finance & HR 0.8
Head of Operational Services 1 Finance Manager 1
Head of Audiences & Learning 1  
Head of Heritage &Culture 1  
Total 7  4.6
Page 366 of 396

Page 367

62 
PKC - GENERAL
Figure 5.7: Option 4 Senior Management Structures 
CEO
Head of
Business
Development
Head of  Support
Services Head of Finance
Head of
Operational
Services
Head of
Audiences &
Learning
Head of Heritage
& Culture
Director PTCH
Director of
External
Relations
Director of
Commercial
Operations
Director of
Finance & HR
Finance Manager
Page 367 of 396

Page 368

63 
PKC - GENERAL
The financial analysis is summarised in Table 5.13 below.
Table 5.13: Option 4 – Culture and Sport ALEO and PTCH change
Category of Expenditure Savings/ Costs
Senior Management re-alignment -£220,169
Terms & Conditions consolidation £560,450
Governance Costs -£52,525
Non Domestic Rates £0
Annual Additional Cost/Saving to PKC £287,756
As can be seen the option again places an additional recurring burden on PKC. This is
mainly due to increased staffing costs as it assumes that the new ALEO would be brought
in line with PKC terms and conditions.
5.2.8 Conclusions & further cost implications
The above assessment shows there is only one option that potentially brings a financial
saving on a recurring basis, Option 2a consolidation of corporate services. However, it
should be noted that there could be significant challenges and costs in delivering this due
to current set ups and requirements. 
Table 5.14 below summarises the financial impact of all of the options. 
• Option 1: Bring all ALEOs in house to PKC.
• Option 2a: Bring some ALEO services in house (e.g. consolidation of corporate
services from ALEOs delivered by PKC) 
• Option 2b: as 2a but with library services brought back into PKC.
• Option 3a: Create one new ALEO 
• Option 3b: two new ALEOs – streamlining corporate and back-office services.
• Option 4: Create one ALEO for culture and sport and consider possible change of
status for Perth Theatre and Concert Hall. 
Page 368 of 396

Page 369

64 
PKC - GENERAL
Table 5.14: Summary of Financial Appraisal
Category of
Expenditure
Option 1 Option 2a Option 2b Option 3a Option 3b Option 4
Senior Management
re-alignment
-£481,774 -£206,349 -£206,349 -£284,768 -£323,561 -£220,169
T&C’s alignment £750,442 £14,542 £14,542 £747,186 £747,786 £560,450
Non-Domestic Rates £2,735,300  £606,800   
Governance Costs -£400,257   -£193,999 -£52,525 -£52,525
Costs/Savings £2,603,711 -£191,807 £414,993 £268,419 £371,100 £287,756 
In addition to the costs that have been highlighted above, there are a number of one off
(and some recurring) implementation costs for each option that would need to be
considered. In some cases, additional costs would require significant investment and may
have an impact on the costings above, especially in relation to the savings currently
attached to Option 2a. While precise costings have not been prepared for all of these
additional costs due to the variation across options and the complexity of costs in areas
like IT and systems, a breakdown of the types of areas under consideration has been
provided below: 
• IT Systems: rationalisation and integration to unified systems across all
organisations.  At present, there are approx. 50 systems in use across ALEO’s for
HR, payroll, budgeting, ticketing, licencing, technical support and customer
service areas. Some of these systems are specific to the organisation and would
need to be kept as there is no PKC equivalent. Costs for recurring contracts and
one off costs are around £420k per annum across all three ALEO’s.  Further work
could be carried out as a separate project if required to analyse full costs of
integration, systems remaining as well as the time and resources required to
deliver on this.  
• Loss of charity status discount: through consolidation of services to PKC, there
could be resulting reductions to discounts for contracts and services which are
both recurring and one off. Costs have not been identified in detail due to the
variable nature. 
• Additional costs for integrated systems: PKC may incur additional costs (one off
and recurring) to consolidate and increase users / capacity of Finance / HR / Payroll
systems. There may also be some implications in terms of flexibility, for example
payroll as PTACH pay sessional / weekly / hourly employees and PKC pay on a
Page 369 of 396

Page 370

65 
PKC - GENERAL
regular monthly basis.  This may also incur additional add on functions to PKC
payroll systems.
• Voluntary Retirement / Redundancy: in the event of staff being displaced as a
result of structural change, there would be additional one off costs for those
entitled to redundancy payments. 
• Implementation resources: to ensure any of the options above was implemented
in the most timely, efficient and cost effective way possible, project management
support would be required as a one off cost. 
5.3 SWOT Analyses
In addition to the financial appraisal, a summary of the Strengths, Weaknesses,
Opportunities and Threats (SWOT) of each option is provided below. These were
discussed at a workshop with the ALEO Review Working Group in August 2025. 
5.3.1   Option 1: Bring all current ALEOs in house to PKC
In addition to potential savings in senior management costs, Option 1 offers the potential
to consolidate service and structures and provides clear lines of accountability through
existing Council governance arrangements. However, there are considerable costs in this
model due to the loss of NDR relief and a shift to in house delivery could have
implications for existing sources of funding to the ALEOs both from public funders (e.g.
Creative Scotland) and trust and foundations. 
While there may be opportunities for further efficiencies through workforce planning and
asset rationalisation the added costs are likely to lead to further cuts with service
reductions likely. 
Page 370 of 396

Page 371

66 
PKC - GENERAL 
5.3.2 Option 2a: Bring Corporate Services in house to PKC
Option 2a delivers some staff savings and consolidates support services within the
Council. However, these saving are modest and, as noted likely outweighed by the costs
of change. All of the ALEOs also raised issues with the extent to which the Council would
be able to meet their specific needs in areas like HR/ payroll, finance and IT. This in turn
could negatively impact on relationship between the Council and the ALEOs.   
Weaknesses:
Cost to Council (NDR and Ts & Cs)
Reduced funding opportunities
Potential risks to current funding
Dilution of brand value
Questions over Council expertise
Loss of service specific expertise
Hidden costs for winding up ALEOs
Strengths:
Consolidation of support services
Senior Management savings
Accountability
Alignment to Council services
Threats:
Reduced focus on services within larger
structures
Financial issues require deeper service
cuts
Ongoing Council budget pressures
Opportunities:
Further savings through workforce
planning Asset rationalisation
Closer links to related Council services
Greater political engagement/
understanding
Weaknesses:
Savings are only modest
Hidden costs (eg IT alignment, HR)
Possible issues with inconsistent support to
ALEOs
Strengths:
Delivers some staff savings
Consistency of systems and support
services within PKC
Retains ALEO identities/ brands
Threats:
ALEOs demanding higher level of service
that Council able to provide
Possible negative impact on Council/
ALEO relationships
Negative impact on ALEO operations?
Opportunities:
Allows ALEOs to pursue income
generation plans
Page 371 of 396

Page 372

67 
PKC - GENERAL
5.3.3 Option 2b: Bring Corporate Services and Library Services in
house to PKC
Option 2b also delivers some staff savings and aligns support systems within PKC while
enabling the ALOEs to continue to operate under their own brands. However, as with 2a,
the savings are modest and could easily be outweighed by the costs. The loss of the NDR
relief on libraries also makes this option less affordable.   
5.3.4 Option 3a: Create a single new ALEO
Option 3a again delivers some staff savings and the potential for more in future with
efficient workforce planning. However, the more consolidated model reduced the extent
of service specific expertise on both the senior management team and the Board. As
noted in the financial appraisal, the main area of cost here is in aligning staff terms and
conditions (to those of CPK/ PKC).  
This option should also afford opportunities for both collaboration and across selling
across service areas as well as cross-subsidy. 
Weaknesses:
Staff savings are only modest
Hidden costs (eg IT alignment, HR)
Loss of libraries NDR savings
Strengths:
Delivers some (modest) staff savings
Consistency of systems and support
services
Retains ALEO identities/ brands
Aligns libraries to Council services
Threats:
ALEOs demanding higher level of service
that Council able to provide
Possible negative impact on Council/
ALEO relationships
Opportunities:
Allows ALEOs to pursue income
generation plans
Page 372 of 396

Page 373

68 
PKC - GENERAL 
5.3.5 Option 3b: Two ALEOs
Similar to Option 3a, Option 3b delivers staff savings (albeit at a lower level) and the
opportunity for more in future. However it is also subject to the hidden costs of change
and the costs associated with the alignment of terms and conditions.  There is also the
question of the strategic coherence of bring together sport and leisure with museums and
libraries and again the loss of service specific expertise that could result.   
Weaknesses:
Cost of alignment of Ts and Cs
Hidden costs (eg IT alignment, HR)
Loss of service specific expertise/ focus at
senior management and Board level
Dilutes individual ALEO brands
Strengths:
Delivers some staff savings
Consistency of systems and support
services
Allows cross-subsidy of services
Allows greater service collaboration across
service areas
Threats:
Long term sustainability not clear
Potential loss of funding
Opportunities:
Possibility to realise other economies of
scale
Allows new ALEO to pursue income
generation plans
Collaboration/ cross-selling across service
areas
Weaknesses:
Cost of alignment of Ts and Cs
Hidden costs (eg IT alignment, HR)
Loss of service specific expertise/ focus at
senior management and Board level (LAL/
CPK)
Dilutes individual ALEO brands (not PTCH)
Lack of strategic coherence between LAL
and CPK services
Strengths:
Delivers some staff savings
Consistency of systems and support
services
Allows cross-subsidy of services (LAL and
CPK)
Allows greater service collaboration
between LAL and CPK
Threats:
Long term sustainability not clear
Potential loss of funding
Opportunities:
Possibility to realise other economies of
scale
Allows new ALEO and PTCH to pursue
income generation plans
Collaboration/ cross-selling across service
areas
Page 373 of 396

Page 374

69 
PKC - GENERAL
5.3.6 Option 4: New Sport and Culture ALEO and change of status for
PTCH
Option 4 is broadly similar to Option 3b but offers the added benefit to PKC of removing
the risk of equal pay claims relating to PTCH (it being independent in this model).
However, the Council should note that this independence could result in less direct
accountability. While independent status can open up some additional funding
opportunities (some trusts are reluctant to support ALEOs), encourage public trust and
donations and would bring PTCH more in line with the wider theatre sector, it is not
without risk to the organisation. ALEO status is generally held to offer greater certainty for
the ALEO regarding council support (although this is not guaranteed) and for councils it
offers clearer accountability and alignment to council priorities. 
5.4 Wider Appraisal
As outlined above, the financial appraisal suggests that Option 2a is the most likely to
deliver financial savings, albeit at a relatively modest level.  However, as discussed,
financial savings, important as they are, should not be the only criteria on which decisions
are made. Here, we appraise each of the options against a wider set of criteria:
Weaknesses:
Cost of alignment of Ts and Cs
Hidden costs (eg IT alignment, HR)
Loss of service specific expertise/ focus at
senior management and Board level (LAL/
CPK)
Dilutes individual ALEO brands (not PTCH)
Reduced Council control/ accountability
(PTCH)
Strengths:
Delivers some staff savings
Consistency of systems and support
services
Allows cross-subsidy of services (LAL and
CPK)
Allows greater service collaboration
between LAL and CPK
Removes equal pay risk for PKC
Threats:
Long term sustainability not clear
Equal Pay issue within PTCH
Longer term funding risk to PTCH?
PKC need to tender for PTCH services?
Opportunities:
Possibility to realise other economies of
scale
Allows new ALEO and PTCH to pursue
income generation plans
New funding opportunities for PTCH
Collaboration/ cross-selling across service
areas
Page 374 of 396

Page 375

70 
PKC - GENERAL
• Income generation – the financial appraisal above focussed mainly on cost
savings, but the different options have implications for income generation in
particular through access to funding sources (weighted x1.5).
• Management focus – considering the extent to which the different models enable
or inhibit sufficient management (and Board) focus on the different service areas.
• Service development – the extent to which the options support the development
of exiting and/ or new services.
• Impact on staff – considering the degree to which each option will have an impact
on staff across the three ALEOs.
• Impact on service continuity – whether or not each option is likely to impact the
continuity of service delivery. 
• Set up costs – considering the potential costs of moving to each option (not
quantified but scored against each other).
• Credibility and influence – the extent to which the options result in a structure
with credibility and influence within and beyond Perth and Kinross.
• Sustainability – assessing the extent to which each option offers a sustainable
model for service delivery (this is weighted x2 to reflect its importance).
• Risk – assessing the level of potential risk associated with each option (weighted
x1.5). 
Each member of the study team scored the options from 1 to 10 (where 1 is negative and
10 positive) independently and the results were compared and combined to arrive at an
overall assessment, summarised in Table 5.15, over.      
Page 375 of 396

Page 376

71 
PKC - GENERAL
Table 5.15: Summary of Qualitative Scoring
Criteria
Option 1 Option
2a
Option
2b
Option
3a
Option
3b Option 4
In House Shared
Services 
Shared
Services
&
Libraries
in house
One
ALEO –
Culture
and
Leisure
Two
ALEOs
PTCH
status/
One
ALEO
Income
generation
7.5 10.5 10.5 12 10.5 10.5
Management
focus on service
6 8 8 6 7 7
Service
development
5 6 6 7 7 8
Impact on staff 4 7 6 5 5 6
Impact on service
continuity
5 7 7 6 6 7
Set up costs 7 8 8 6 6 6
Time to deliver 5 7 6 5 6 6
Credibility and
influence 
6 7 7 8 7 7
Sustainability 14 16 16 14 12 12
Risk 9 9 9 10.5 10.5 10.5
Total Score 68.5 85.5 83.5 79.5 77 80 
The rationale for the scoring is as follows:
• Income generation – options which create new consolidated ALEOs offer strong
income generation opportunities but also the risk that some trusts and other
funders’ income may reduce if they choose to fund only once to the new body/
bodies, compared to the shared services model where the individual ALEOs
continue to operate. Council-run services would not have access to the range of
funding sources available to ALEOs and charities.   
Page 376 of 396

Page 377

72 
PKC - GENERAL
• Management focus – options which consolidate services under a single
management structure lead inevitably to rationalisation of management teams and
Boards (with cost savings as considered above) and therefore to a dilution of
service specific focus and expertise compared to options which maintain the three
organisation structures.   
• Service development – the more consolidated models were judged to offer
slightly greater potential for service development through opportunities for
income generation, collaborative effort and cross-subsidy.  Council delivery scored
lower here due to the financial impact of the loss of non-domestic rates relief,
which would constrain service development. 
• Impact on staff – options that result in significant structural changes are likely to
be disruptive for staff and those that are based on consolidation could also result
in headcount reductions. These options therefore scored lower. 
• Impact on service continuity – similarly, options which propose high levels of
restructure carry a higher risk of services being disrupted through the change
process. 
• Set up costs – greater levels of structural change are likely to incur more in the way
of set up costs, including legal and related costs as well as costs relating to
potential staff restructure.  
• Credibility and influence – experience from further afield suggests that larger
organisations often carry more weight and influence. However, in this case PTCH
may be better served by having its own identity, particularly in relation to the
theatre production sector and audience. Delivery from within the council was felt
to result in a lower level of influence based on concerns that the services could
have a lower profile alongside much larger statutory provision.  
• Sustainability – the financial appraisal demonstrates the potential of most options
to deliver significant savings is limited. Therefore, none can be assessed as offering
strong potential for a sustainable model other than the shared services model
which is itself modest.  
• Risk – the appraisal found little to separate the options in terms of risk as all raise
issues in some form from funding risks in consolidated models to financial risks.
The single ALEO model was judged least risky on the basis that it protects rates
relief and other ALEO benefits while offering the potential for longer term
economies of scale and service development.   
Page 377 of 396

Page 378

73 
PKC - GENERAL
On the basis of this scoring, the shared services model emerges as the strongest option,
albeit largely as a result of the fact that it avoids the risks and issues associated with
significant structural change while delivering some modest financial benefit. 
5.5 Preferred Option
The importance of the financial context, and the need to identify a sustainable model for
the delivery of culture and leisure services in Perth and Kinross point towards the shared
services model (Option 2a) as the most promising. However, as noted earlier, this is not
without complication given the different requirements of each of the three ALEOs, the
differences in terms and conditions for affected staff and the concerns raised by all three
in relation to whether or not a single service would be sufficiently flexible and responsive
to meet their needs.  
The status quo position is not sustainable, at least not on its current trajectory, but there
are some mitigating factors that should be considered.  
• PTCH is working to a plan to further increase its income through growth in
commercial activity, increased ticket sales with more production activity and a
focus on fundraising particularly with trusts and foundations. Progress has been
made and it is likely that this could result in a more financially robust position
within a few years. 
• The planned PH2O facility will replace the Bell’s Centre and the existing leisure
pool and will enable LAL to move to a more sustainable platform through
increased income and cost reduction at these other sites (there may also be an
opportunity for an alternative delivery model for the Dewars’ Ice facility). 
It is also important to consider the return on PKC’s investment in terms of the value and
impact that culture and leisure can create for Perth and the wider region. Linking back to
the Council’s priorities set out in the Corporate Plan, the three ALEOs can make a clear
contribution to priorities around physical and mental health and wellbeing, education and
in helping to mitigate the negative impacts of poverty and inequality. They can also,
through their combined asset base and service portfolio, make a significant contribution
to local economic development through area regeneration and the promotion of the
visitor economy. PTCH’s impact work demonstrates this potential and points towards the
Page 378 of 396

Page 379

74 
PKC - GENERAL
potential gains of the three ALEOs working more closely together around this shared
agenda.    
5.6 PKC Objectives and Critical Success Factors
As set out in the study brief, PKC identified two objectives for the ALEO Review work,
along with seven critical success factors. 
5.6.1 PKC Objectives
PKC identified two main objectives for the ALEO Review work, as follows:
• Ensure a sustainable model of delivery for leisure and culture services in future.
• A more streamlined and consistent approach across all ALEO organisations in
terms of systems and corporate support.
Table 5.16, below, summarises the extent to which the identified options meet these
objectives. 
Table 5.16: PKC Objectives 
As shown, while the options generally do result in a more streamlined approach in terms
of systems and corporate support, the financial appraisal suggest that only Option 2a (and
possibly Option 4) offers the potential to develop a more sustainable model. However,
even for these options, this assessment remains uncertain.  
5.6.2 Critical Success Factors
Table 5.17, over, maps the options against the seven critical success factors (CFSs)
identified by PKC for the review work. 
Option 4Option 3bOption 3aOption 2bOption 2aOption 1PKC Objectives
MaybeNoNoNoMaybeNoSustainable Model
SomeSome (LAL
and CPK)
YesYesYesYesStreamlined and
consistent approach to
Corp Services
Page 379 of 396

Page 380

75 
PKC - GENERAL
Table 5.17: Critical Success Factors 
Option 4Option 3bOption 3aOption 2bOption 2aOption 1CSFs
NoNoNoNoMaybe No1. Reduce costs / make
savings
NoNoNoNoNoNo2. Reduce ALEO
properties across Perth
& Kinross
MaybeNoNoNoNoNo3. Increased income
opportunities –
specifically in PTCH
Yes (PTCH
no longer
an ALEO)
YesYesNoNoYes4. Ensuring consistency
and equity in terms
and conditions of
employment in ALEO’s
PKC to
advise
PKC to
advise
PKC to
advise
PKC to
advise
PKC to
advise
PKC to
advise
5. Compliance with all
related employment
law across all ALEO's
Some (LAL
and CPK)
Some (LAL
and CPK)
YesYesYesYes6. Consolidation of
corporate services
NoNoNoNoMaybeNo7. Optimise PKC
investment in culture
and leisure through the
arms-length model
Page 380 of 396

Page 381

76 
PKC - GENERAL
As shown, none of the options meets all of the CSFs. Most obviously, only Option 2a
delivers savings, but as noted above, these are likely cancelled out by the costs of aligning
systems.  None of the options makes it more or less likely that ALEO properties would be
reduced as this remains a decision for the Council and not one that is materially impacted
by the structural options. 
The only option that can clearly contribute to income generation is Option 4 by virtue of
the independent status of PTCH, and the resulting ability to access funding not available
to ALEOs or Councils.  This is not to say that income generation is not possible under the
other options – it is and all ALEOs have plans to do so – but rather that this is not
dependent on the structures proposed by the options.
Consistency in terns and conditions is a feature of Options 1, 3a, 3b and to some extent in
Option 4.  However, as noted, this comes at a considerable cost. All of the options do
result in greater consolidation of corporate services either within PKC or as part of a more
consolidated ALEO structure.  
In terms of the final CSF – optimising investment - the assessment remains unclear. As
noted, none of the options deliver significant savings so if the starting point is that the
current level of investment is not sustainable, then the proposed structural changes do
not offer a clear path to a more sustainable model. 
Page 381 of 396

Page 382

77 
PKC - GENERAL
6 Conclusions & Recommendations 
In this section, we present our overarching conclusion and discuss the implications of this
for PKC and the three ALEOs.
6.1 Appraisal Conclusions
The purpose of the study was to appraise the identified options for structural change in
the delivery of culture and leisure services in Perth and Kinross. The status quo, at least in
its current trajectory, is not considered sustainable as it is likely to demand a growing level
of subsidy from PKC.  
Examining each of the options in more detail reveals that the potential to achieve
significant savings is limited in virtually all options. The most promising is that of a shared
services model for corporate and back-office support functions but even this offers only
modest savings for a potentially significant level of operating risk. Indeed, the hidden
costs of aligning systems in areas like finance and IT is likely to offset the identified
savings. 
Thus, our overarching conclusion is that structural change (at least those identified in the
options) is unlikely to deliver the level of savings and efficiencies that will result in long
term sustainability.   
With that in mind, we have given some initial thought to what else might now be
considered and have proposed a twin track approach that combines a strategic approach
to more structured collaboration with more operational measures to grow income and
manage costs. 
6.2 Recommendations
6.2.1 Strategic Alliance
We believe an option worth considering that avoids structural/governance
change/disruption is that of ‘Status Quo+’. This would seek to build on the considerable
collective strengths of the three ALEOs and PKC’s Events team by creating a more
Page 382 of 396

Page 383

78 
PKC - GENERAL
formalised ‘Strategic Alliance’ built on shared objectives and cooperative working
practice. 
An illustrative approach is outlined below:
A Strategic Alliance between Perth and Kinross Council (PKC), Culture Perth and Kinross
(CPK), Perth Theatre and Concert Hall (PTCH), and Live Active Leisure (LAL) would provide
a framework for collaborative leadership in delivering cultural, leisure, and wellbeing
outcomes across the region. Such an alliance would not constitute a merger or legal
restructuring but would formalise a commitment to shared goals, coordinated delivery,
and strategic investment.
Establishment
The alliance would be established through a Memorandum of Understanding
(MoU) signed by the Chief Executives and Chairs of each organisation and by senior PKC
officers. This document would outline shared principles, such as collaboration, inclusivity,
transparency, and set out agreed priorities. A cross-organisational Strategic Alliance
Board would be convened, comprising senior representatives from each partner, meeting
quarterly. PKC would act as a convener and enabler, ensuring alignment with council
priorities and resource planning.
The Alliance would be underpinned by a Joint Strategic Plan, co-developed with input
from communities and staff, aligning organisational strategies with key themes such as
community wellbeing, creative economy development, equal access to services, and
sustainability. This plan would inform joint funding bids, capital development proposals,
and advocacy work at national level.
Operation
The Strategic Alliance would operate as a coordinating forum, not a delivery body. It
would enable alignment without undermining the autonomy or governance of member
organisations. Key operational mechanisms would include:
• Shared Working Groups focused on joint themes (e.g. capital investment,
outreach and inclusion, programming).
• Coordinated Planning Cycles to allow visibility of programming, infrastructure
plans, and funding requirements across partners.
Page 383 of 396

Page 384

79 
PKC - GENERAL
• Data and Evaluation Collaboration to develop shared metrics and evidence
impact across services.
• Joint Staff Development opportunities to foster cross-sectoral skills and
understanding.
Resource-sharing arrangements (for example, for communications, ticketing platforms, or
digital infrastructure) could be explored where appropriate, particularly where cost-
efficiencies and audience benefits align.
Shared Objectives
The Alliance’s shared objectives might include:
• Enhancing community health and wellbeing through joined-up cultural and
active lifestyle initiatives.
• Strengthening inclusion and access for underserved groups across rural and
urban areas.
• Growing the local economy and Perth and Kinross visitor economy developing
career pathways across cultural and leisure sectors.
• Coordinating capital planning to maximise public benefit and avoid duplication of
investment.
• Advocating for national recognition and funding for Perth and Kinross as a
regional cultural leader.
• Seeking efficiencies in service delivery. 
This strategic alliance would aim to strengthen the region’s collective voice, improve
outcomes for residents, and provide a more resilient and agile delivery model for public
cultural and leisure services.
6.2.2 Operational Measures
In addition to the strategic approach suggested above, it will also be necessary to look to
other more practical measures and here the options are limited, and few can be
considered straightforward.  While detailed analysis of each of these is beyond the scope
of the current appraisal, we have provided here some initial thoughts on the following:
• Income growth.
Page 384 of 396

Page 385

80 
PKC - GENERAL
• Property rationalisation.
• Workforce planning.
• Other efficiency measures.   
Income Growth
There is undoubtedly some potential for income growth in all three ALEOs, but most
obviously in LAL and PTCH. Unless a decision is taken to introduce admission charges at
Perth Museum and Art Gallery, the potential for CPK to generate significant levels of
additional income will be limited.  
LAL is likely to realise some savings (see below) and achieve some income growth with
the development of the new PH2O facility, even if this will take some years to materialise.
Beyond this, pricing models may offer some income growth, as well as prioritisation of
revenue generating services (e.g. health and fitness, swimming lessons, gymnastics
classes etc) but the potential scale of this opportunity requires further analysis to quantify.   
PTCH, as noted earlier, is working to a plan to increase its income both through ticket
sales and from commercial hires as well as via fundraising efforts to target more trusts and
foundations. While initial signs are good and progress has been made, this again is likely
to take a few years to reach a level that will have a meaningful impact on the level of
subsidy required from PKC.  
Nonetheless, income growth should certainly be part of a forward strategy for the
services. It is worth noting that we found little to separate the structural options in respect
of their potential to support income growth, and some presented risks as detailed earlier.    
Property Rationalisation
Similarly, the potential of the various structural options to support property rationalisation
did not vary as decisions on this matter ultimately rest with PKC regardless of what ALEO
structures are in place. While any decisions about property rationalisation should be taken
on the basis of due consideration and analysis of evidence relating to, inter alia, building
conditions, usage patterns, financial sustainability, availability of alternative provision, and
wider asset rationalisation plans, we offer the following thoughts:
• PTCH has little scope for rationalisation – closure of either venue would
significantly impact both on the financial viability of the organisation and the
Page 385 of 396

Page 386

81 
PKC - GENERAL
perception and reputation of Perth. This would risk the loss of the significant
economic and community benefits that the organisation creates.
• Similarly, Perth Museum and Art Gallery is a flagship asset for the city and the
region which cannot be relocated to another facility. This leaves CPK with the
library estate, which may offer potential for rationalisation as part of the move
towards more integrated community facilities. While there is always a risk of
political and community resistance, the community hub model which brings
together different services within a single location makes good sense in both
financial and service development terms.  
• Parts of the leisure estate may also lend themselves to consideration within
community hub proposals and should be part of this process. In addition, LAL’s
Strategic Asset Review has identified the potential to close some assets with the
arrival of PH2O which will certainly result in savings as well as providing an
improved offer. 
Again, while the scope for property rationalisation may be limited, this should still be
considered in line with PKC’s wider asset rationalisation plans. 
Workforce Planning
Our experience is that detailed workforce planning can usually deliver savings, sometimes
at a quite significant scale. This requires detailed analysis of rotas and shift patterns
against usage data to identify periods when facilities and overstaffed and underused. It
should also extend to detailed consideration of job roles and where there may be
potential for rationalisation.
As analysis at this level of detail is beyond the scope of the current appraisal, it is difficult
to comment at this time on the potential scale of efficiencies that might be achieved.
However, we recommend that such an exercise is undertaken for all three ALEOs
(recognising that PTCH’s venues are used in a different way) with a view to identifying
efficiencies in staffing structures. 
It is perhaps worth also noting that while larger (more consolidated) structures generally
do offer greater potential for staff savings, in practice the realisation of these does not
often cross service boundaries (i.e. leisure centre staff do not easily transfer to museums).
Gains tend to be within rather than across service areas apart from management and
corporate functions (which have been addressed in the earlier appraisal).    
Page 386 of 396

Page 387

82 
PKC - GENERAL
Other Efficiency Measures
Greater collaboration across the three ALEOs can offer some potential for efficiencies in
areas like procurement and purchasing, These are likely to be modest gains, but one area
worth considering is energy.  
Utilities Payment Agency Agreement 
The ALEOs have an opportunity to achieve significant financial savings by establishing an
agency agreement with PKC for utility payments. Under this arrangement, PKC would
manage utility payments on behalf of the ALEOs, with costs offset against the Service Fee
provided by PKC, making it cost-neutral for the Council. 
The key benefit for the ALEOs is reducing irrecoverable VAT paid to HMRC, which is
currently a significant cost. By having PKC manage utility payments, the ALEOs would
avoid VAT charges that cannot be reclaimed. Due to information at the time, we can only
look at the potential benefits from a LAL perspective (as shown in Table 6.1) but there is
no reason why these cannot be replicated across the other two bodies. It should also be
noted that this is based on all LAL properties and it is likely that those that are directly
owned by LAL would not qualify for inclusion in such a scheme. The actual savings for LAL
would therefore likely be lower than the indicative figures provided below. 
Table 6.1: Energy Agency agreement – LAL Example
Item Value
Energy Costs £1,083,497
Irrecoverable VAT rate 11%
Potential Saving £119,185
Similar arrangements across the country have shown success, such as those being
implemented by Active Stirling, West Lothian Leisure and Edinburgh Leisure.  
The agency agreement would reduce operational costs without compromising service
quality. By shifting utility responsibilities to PKC, ALEOs could focus resources on the
delivery of services. It also fosters a stronger partnership between the ALEOs and PKC,
aligning all organisations towards efficient resource utilisation and community
enhancement. 
Page 387 of 396

Page 388

83 
PKC - GENERAL
Further discussions and evaluations are needed to refine the proposal and align it with the
financial frameworks of the ALEOs and PKC. Proper planning and negotiation can ensure
the arrangement benefits both parties while maintaining transparency and mitigating
risks. 
Overall, this agreement provides a practical solution, enabling cost savings and
supporting the sustainability of services for the community. 
Page 388 of 396

Page 389

84 
PKC - GENERAL
Appendix A: ALEO Review Working
Group
Members of the ALEO Review Working Group are as follows:
ALEO Chief Executives
• Paul Cromwell – Live Active Leisure
• Chris Glasgow – Perth Theatre and Concert Hall (Horsecross Arts Limited)
• Helen Smout – Culture Perth and Kinross 
Perth and Kinross Council Officers
• Charlene Guild, Strategic Lead, Projects & Programmes (Lead)
• Stephen Crawford, Strategic Lead, Property
• Pauline Johnstone, Corporate HR Manager
• Serge Merone, Strategic Lead
• Lisa Simpson, Strategic Lead, Legal & Governance
• Scott Walker, Strategic Lead, Finance & Business Support 
• Steve MacDonald, Service Manager, Economic Development
• Norman Ballantine, Transformation & Change Programme Manager
• Alan Taylor, Strategic Lead, Customer & Digital Services 
Page 389 of 396

Page 390

Page 390 of 396

Page 391

Mon Tues Wed Thurs Fri Mon Tues Wed Thurs Fri Mon Tues Wed Thurs Fri Mon Tues Wed Thurs Fri Mon Tues Wed Thurs Fri
January    1  2 5  6  7
P&P
(9:30am)
8 9 12  13 14
Council 
(10:00am)
15  16 19
Licensing 
(1:00pm)
20  21
Licensing
Board
(9:30am) 
H&SW 
(1:00pm) 
22  23 26
LRB
(1:00pm)
27  28
E&I 
(9.30am) 
S&P (1:00pm) 
29 30
February  2
Common
Goods
(1.00pm) 
3 4
L&F
(9:30am) 
F&R 
(1.00pm) 
5 6 9
Property Sub
(1.00pm)
10  11
P&P
(9:30am) 
12  13 16  17  18
Licensing
Board
(9.30am) 
Climate
(1.00pm) 
19
KC
(5.00pm)
20 23  24  25
Council
(10.00am)
26  27      
March  2
LRB 
(1.00pm)
3 4
Council
(10.00am)
5 6 9
Licensing
(1.00pm) 
10  11
P&P
(9.30am) 
JNC
(2.30pm) 
12  13 16
L&F Exec
Sub
(1:00pm) 
17  18  19  20 23
A&R
(1.00pm) 
24 25
H&SW
(9:30am) 
S&P
(1:00pm) 
26  27 30
LRB
(1.00pm) 
31    
April    1
Licensing
Board
(9:30am) 
JCC 
(1:30pm) 
2 3 6  7  8  9  10 13
Licensing 
(1.00pm)
14  15
P&P
(9:30am) 
16  17 20  21  22
E&I
(9:30am) 
F&R
(1.00pm)
23  24 27
LRB
(1.00pm)
28 29
Council
(10.00am)
30 
May       1 4
Common
Goods
(1.00pm) 
5 6  7
Scottish
Parliament
Elections
8 11
Licensing
(1.00pm)
12  13
P&P
(9:30am)
14
KC
(5.00pm)
15 18
Property Sub
(1.00pm)
19  20
Licensing
Board
(9:30am)
21  22 25
LRB
(1.00pm)
26  27
Climate
(9:30am) 
L&F
(1.00pm)
28 29
June  1
L&F Exec Sub
(1.00pm)
2 3
H&SW
(9:30am) 
S&P
(1:00pm) 
4 5 8  9  10
P&P
(9:30am) 
JNC
(2.30pm)
11  12 15
Licensing
(1:00pm) 
16 17
Council
(10.00am)
18  19 22
LRB (1.00pm) 
23  24
F&R 
(9.30am) 
JCC (1:30pm) 
25 26 29
A&R 
(1.00pm)
30   
July    1
Licensing
Board
(9:30am) 
2 3 6  7 8
P&P
(9:30am) 
9 10 13  14 15  16 17 20  21  22 23 24 27  28 29  30 31
August 3
LRB
(1.00pm)
4 5
Licensing
Board 
(9:30am) 
6 7 10
Licensing
(1.00pm)
11 12
P&P
(9:30am)
13  14 17  18  19  20  21 24
L&F Exec Sub
(1.00pm) 
25  26
E&I 
(9:30am) 
27  28 31
LRB 
(1.00pm)    
September   2
Council
(10.00am) 
3 4 7
Common
Goods
(1.00pm) 
8 9
P&P
(9:30am) 
JNC
(2.30pm)
10  11 14
Property
Sub
(1.00pm) 
15  16
Climate
(9:30am) 
L&F
(1.00pm)
17
KC
(5.00pm)
18 21
A&R 
(1.00pm) 
22 23
Licensing
Board
(9:30am) 
S&P
(1.00pm) 
24  25 28
LRB
(1.00pm) 
29  30
H&SW
(9:30am) 
F&R (1.00pm)  
October     1 2 5
Licensing
(1.00pm) 
6 7
JCC
(1.30pm) 
8 9 12  13  14
P&P
(9:30am)
15  16 19  20 21  22  23 26
LRB
(1:00pm)
27  28
Council
(10.00am)
29 30
November 2
Licensing
(1.00pm)
3 4
Licensing
Board
(9:30am) 
E&I
(1.00pm)
5 6 9
L&F (1.00pm)
10  11
P&P
(9:30am) 
L&F Exec
Sub
(2.00pm)
12  13 16
Property
Sub
(1.00pm) 
17  18
S&P
(9.30m) 
Climate
(1:00pm) 
JNC
(2.30pm)
19
KC
(5.00pm)
20 23
LRB 
(1.00pm) 
24  25
H&SW
(9.30am) 
F&R
(1.00pm) 
26  27 30
A&R
(1.00pm) 
December  1 2
Council
(10.00am) 
3 4 7
Licensing
(1.00pm) 
8 9
Licensing
Board
(9:30am) 
JCC
(1.30pm) 
10  11 14
Common
Goods
(1.00pm) 
15  16
P&P
(9:30am) 
17  18 21
LRB
(1.00pm)
22 23  24 25 28 29 30 31 
10
Page 391 of 396

Page 392

Recess Periods (all
inclusive) 
End of Cycle 
P&P   = Planning and Placemaking Committee
LRB   = Local Review Body
E&I   = Economy an Infrastructure Committee
H&SW   = Housing & Social Wellbeing Committee
L&F   = Learning & Families Committee
F&R    = Finance and Resources Committee
JCC    = Employees Joint Consultative Committee
JNC   = Joint Negotiating Committee for Teaching Staff
L&F Exec Sub  = Lifelong Learning Executive Sub-Committee
Licensing   = Licensing Committee
CC&S   = Climate Change and Sustainability Committee
A&R   = Audit & Risk Committee
KC   = Kinross-shire Committee 
S&P   = Scrutiny and Performance Committee 
Page 392 of 396

Page 393

Draft Indicative Committee Timetable – January - May 2027 
Recess Periods (all
inclusive) 
End of Cycle 
P&P   = Planning and Placemaking Committee
LRB   = Local Review Body
E&I   = Economy an Infrastructure Committee
H&SW   = Housing & Social Wellbeing Committee
L&F   = Learning & Families Committee
F&R    = Finance and Resources Committee
JCC    = Employees Joint Consultative Committee
JNC   = Joint Negotiating Committee for Teaching Staff
L&F Exec Sub  = Lifelong Learning Executive Sub-Committee
Licensing   = Licensing Committee
Climate   = Climate Change and Sustainability Committee
A&R   = Audit & Risk Committee
KC   = Kinross-shire Committee 
S&P   = Scrutiny and Performance Committee 
Mon Tues Wed Thurs Fri Mon Tues Wed Thurs Fri Mon Tues Wed Thurs Fri Mon Tues Wed Thurs Fri Mon Tues Wed Thurs Fri
January      1 4  5  6
P&P
(9.30am)
7 8 11  12 13
Licensing
Board
(9.30am)
14  15 18
LRB
(1.00pm)
19  20
H&SW
(9.30am)
21  22 25
Licensing
(1.00pm)
26  27
E&I
(9.30am) 
S&P
(1.00pm) 
28 29
February  1
Common
Goods
(1.00pm)
2 3
L&F
(9.30am) 
F&R
(1.00pm)
4 5 8
Property Sub
(1.00pm)
9 10
P&P
(9.30am)
11  12 15
LRB
(1.00pm) 
16  17
Licensing
Board
(9:30am) 
Climate
(1:00pm) 
18
KC
(5.00pm)
19 22  23  24
Council
(10.00am)
25  26      
March  1  2  3
Council
(10.00am)
4 5 8
Licensing
(1.00pm)
9 10
P&P
(9.30am) 
JNC
(2.30pm)
11  12 15
L&F Exec
Sub
(1.00pm)
16  17
JCC
(1.30pm)
18  19 22
A&R
(1.00pm)
23 24
H&SW
(9.30am) 
25  26 29
LRB
(1.00pm)
30  31
Licensing
Board
(9.30am) 
April     1  2 5  6  7  8  9 12
Licensing
(1.00pm)
13  14
P&P
(9.30am)
15  16 19  20  21
F&R 
(9.30am) 
22  23 26  27 28
Council
(10.00am)
29 30
May  3 4  5  6
Scottish
Local
Gov
Elections
7 10  11  12  13  14 17  18  19  20  21 24  25  26  27  28 31 
10
Page 393 of 396

Page 394

Page 394 of 396

Page 395

Committees / Sub-Committees /
Groups SNP Scottish
Con
Scottish
Lib Dem
Ind
Group Lab Cllr Chan Cllr Laing  
40% 30% 12.5% 10% 2.5% 2.5% 2.5%
15 member (+ Provost on F+R) 6 5 2 2 0 0 0
13 member 5 4 2 2 0 0 0
11 member 4 or 5 3 or 4 1 or 2 1 0 0 0
9 member 4 3 1 1 0 0 0
7 member 3 2 1 1 0 0 0
5 member 2 2 0 or 1 0 or 1 0 0 0
3 member 1 1 0 or 1 0 or 1 0 0 0              
Overall 16/40 12/40 5/40 4/40 1/40 1/40 1/40               
Standing Order 6.1 - In appointing members to Committees and Sub-Committees, the Council shall, so far as possible, give effect
to the principles regarding political balance set out in the Local Government and Housing Act 1989. 
11(i)
Page 395 of 396

Page 396

Page 396 of 396