PKC - GENERAL 
Option Appraisal for Arms
Length External Organisations in
Perth and Kinross
Appendix 2
Report for Perth and Kinross Council | September 2025

Page 2

Please consider the environment before printing this document
PKC - GENERAL
Direct enquiries regarding this report
should be submitted to: 
Brian McLaren, Managing Director
Email: brian.mclaren@ekos.co.uk   
EKOS Limited
St. George’s Studios
93-97 St. George’s Road
Glasgow, G3 6JA
Reg 145099
www.ekos-consultants.co.uk

Page 3

PKC - GENERAL
Contents 
1 Introduction 1
2 Context 4
3 ALEOs 15
4 Options 39
5 Appraisal 44
6 Conclusions & recommendations 77
Appendix A: ALEO Review Working Group 84

Page 4

1 
PKC - GENERAL
1 Introduction
1.1 Introduction
This report presents the findings of an appraisal of options to change the current structure
of Arm’s Length Organisations (ALEOs) providing leisure, culture and performing arts
services across Perth and Kinross. The ALEOs in question are:
• Live Active Leisure (LAL).
• Culture Perth and Kinross (CPK).
• Perth Theatre and Concert Hall (PTCH).
The study takes place at a challenging time for local authorities. The combination of many
years of austerity measures to reduce the UK budget deficit and the COVID-19 pandemic
have had a huge impact on public sector finances. These external shocks compound long
standing challenges facing councils with increasing demand for services such as health
and social care, and more recent cost increases due to a period of high inflation and fast
rising energy and staff costs.  
The operating environment for publicly funded leisure and culture services is currently
very challenging. Low cost private and online providers; changing customer needs; very
high levels of capital investment needed for venues to remain attractive, competitive and
safe; and decreasing funding available are all drivers for this review of current ALEO
structure and models. 
In 2024/25, ALEOs faced significant internal recurring revenue pressures as well as
provisionally approved savings totalling at least £2.5m. With decreasing funding available
and cost of living / inflationary increases continuing, there needs to be some
consideration of how the services delivered by ALEOs remain sustainable in future. 
At a full Perth and Kinross Council (PKC) meeting on 6 December 2023, a full report was
presented setting out clear recommendations for reviewing the ALEO corporate service
structure. This work forms part of the wider Transformation & Change programme being
led by PKC alongside ALEO partners and builds on previous work and analyses
conducted by Perth and Kinross Council (PKC).

Page 5

2 
PKC - GENERAL
1.2 Project Objectives and Method
Study purpose
The primary purpose of the study is to undertake an appraisal of a series of defined
options for the delivery of culture and leisure services in Perth and Kinross. These options
were set out in the council’s previous review work and are as follows: 
• Option 1: Bring all ALEOs in house to PKC.
• Option 2: Bring some ALEO services in house (e.g. consolidation of corporate
services from ALEOs delivered by PKC) and ALEOs retain own identity / library
services brought back into PKC.
• Option 3: Create one new ALEO / two new ALEOs – streamlining corporate and
back-office services.
• Option 4: Create one ALEO for culture and sport and considering possible change
of status for Perth Theatre and Concert Hall.
Method
The study was conducted in seven stages, as shown below. 
Background information, including financial information, monitoring reports and staffing
structures were provided to the consultant team by the ALEOs and PKC, and a
1. Inception
2. Data
Collection &
Baseline
3. Stakeholder
Engagement
4. Financial and
Operational
Analysis
5. Option
Development
and Appraisal
6. Draft Report
7. Final Report
and
Presentation

Page 6

3 
PKC - GENERAL
programme of consultation was agreed with the ALEO Review Working Group (see
Appendix A for a list of members). The consultations included council officers and
elected members on the ALEO Boards, senior managers across the three ALEOs and a
selection of ALEO Board members. 
Following the consultation work, the team completed a financial analysis of the ALEOs
and each of the defined options. The financial appraisal was then supplemented with a
more qualitative appraisal drawing on the consultation inputs and the wider experience of
the consultant team as reported here.

Page 7

4 
PKC - GENERAL
2 Context
2.1 National Context
2.1.1 External Delivery Models
Over the last 40 years or so, Councils in Scotland (and elsewhere) have increasingly
looked to alternative delivery models for services, including culture and leisure services.
The most commonly used alternative to in house delivery of culture and leisure is that of
the arm’s length external organisation (ALEO). 
ALEO is not a legal company structure. Rather ALEOs may take different forms including
limited companies, limited liability partnerships, community interest companies and
trusts. 
In Scotland, ALEOs are normally established as a limited companies with charitable status,
with the charity status conferring benefits in the form of exemption from non-domestic
rates for properties managed by the ALEO. This benefit was effectively discontinued
following the Barclay Review of Business Rates in 2017. While the exemption continues for
properties that were already managed by ALEOs (councils now have a cap of the relief
that they can claim), no new properties coming under ALEO management will have the
exemption, a change that acted as a disincentive to councils seeking to establish new
ALEOs or add more properties into the existing trusts. 
There are, of course, other benefits attributed to the ALEO model. Freedom from Council
bureaucracy, access to other sources of funding and the ability to develop more agile,
entrepreneurial cultures are frequently identified benefits of the externalised models.
These benefits led more and more councils to seek to externalise service delivery, and for
more to join culture and leisure services together to form larger, multi-function ALEOs in
which revenue generating services such as health and fitness could help cross-subsidise
those that create little income, such as libraries.
ALEOs typically receive payments for their council for the delivery of services (commonly
known as a management fee) and may also make use of council services in areas like
payroll, finance, HR and IT. Most (but not all) are established as single member companies
in which the council is the sole member.

Page 8

5 
PKC - GENERAL
The ALEO model has always been politically sensitive, with some considering it to result in
reduced accountability for what remain public services, even despite the presence of
elected members on ALEO Boards and quite clear governance structure and practices.
Indeed, a number of councils, including North Lanarkshire and Falkirk, have recently
brought services back in house, foregoing rates savings in favour of what is perceived to
be a greater degree of control over public services.  
However, only ten councils continue to deliver both culture and leisure in house,
underlining the appeal of the ALEO model. Of those that do have one or more ALEOs, 12
have a single ALEO covering both culture and sport. 16 councils deliver culture services in
house and ten deliver leisure services.
2.1.2 Budget Pressures
A recent report for Community Leisure UK1 paints a very challenging picture for local
authority culture and leisure services. The report found growing financial pressure on the
services, regardless of whether they were delivered in house or externally, reflecting a
number of factors:
• over a decade of austerity measures affecting public finances following the
2008 financial crisis everting pressure on local government budgets. 
• growing demand for health and social care services as a result of the ageing
population in the UK and in Scotland. This has required increases in resources
for these services without growth in public sector budgets to match, hence
other services having to find savings.
• increasing ringfencing of council budgets for national priorities, reducing more
discretionary spend.
• lack of statutory protection for culture and leisure services, meaning that when
Councils face difficult budget decisions (as they have done for many years now)
they prioritise statutory services, again resulting in larger reductions for non-
statutory provision like culture and leisure. 
1 Review of Culture and Leisure Services in Scotland (2024), report by EKOS for Community Leisure UK,
Creative Scotland and sportscotland.

Page 9

6 
PKC - GENERAL
• growing competition from the private sector in health and fitness (e.g. low-cost
gyms) which has impacted on revenue generation for leisure services.
More recently, the combination of the pandemic, rising inflation and the cost-of-living
crisis have added further pressure to services that have already sustained budget cuts for
more than 10 years. 
The report also suggests that funding is expected to continue to fall, with previous
reductions in staff and, in some cases, facilities impacting the range and quality of service
provision. Many across the sector expect that these trends will continue, with further
reductions in staff and facilities, and resulting negative impacts on services.
2.2 Strategic Context
This section outlines the key local, national, and sector-wide policies and strategies that
have informed the options appraisal for the future structure and governance of Arms
Length External Organisations (ALEOs) delivering leisure, culture, and performing arts
services in Perth and Kinross. These documents provide critical context on strategic
direction, governance expectations, legal frameworks, financial sustainability, and sector-
specific best practice. Ensuring alignment with these strategies will help ensure that any
future model reflects the Council’s aspirations and statutory responsibilities and is
positioned for long-term success.
2.2.1 Perth and Kinross Council Strategies and Initiatives
ALEO Transformation Review Report (Perth and Kinross Council, December 2023)
This internal report sets out the Council’s rationale for undertaking a full review of its
existing ALEO arrangements. It identifies several challenges including financial pressures,
governance risks, strategic misalignment, and single-point dependencies in monitoring
arrangements. The report outlines the need for stronger integration with Council priorities
and greater transparency in performance and oversight.
This report provides the official mandate for the current options appraisal (although as
discussed below the ALEO Review work has a longer history). It defines the scope, drivers
for change, and the critical success factors to be achieved through any revised
governance or delivery model.

Page 10

7 
PKC - GENERAL
Perth and Kinross Community Plan (Local Outcomes Improvement Plan) 2022-2032
The Perth and Kinross Community Plan identifies five priorities to enable “a confident,
ambitious and fairer Perth and Kinross”. These priorities target poverty, health and
wellbeing, employability, digital participation and learning and development and provide
a framework for action across the community planning partners.  
Perth and Kinross Council Corporate Plan 2022/23 – 2027/28
Aligned to the Community Plan, the PKC Corporate Plan sets out the Council’s priorities
over a five year period and reflects the growing challenges post-Covid with cost of living
pressures and increasing inequality. These priorities include actions to tackle poverty,
improve health and wellbeing, grow the local economy, address the climate emergency
and ensure a positive future for children and young people. All ALEOs within Perth and
Kinross have a clear role to play here, not least in supporting economic growth and
improving health and wellbeing.   
Perth and Kinross Local Economic Action Plan (2025-2030)
The Council priorities are reflected in the Perth and Kinross Economic Plan, with a strong
focus again on addressing poverty and inequality and realising the opportunities of net
zero. The Economic Plan is itself aligned to the Tay Cities Regional Economic Strategy
(2019-2039) and the Prospectus for Regional Growth (2025-2035) which both recognise
the role of tourism and culture in supporting the long term economic ambitions of the Tay
Cities region. 
Perth and Kinross Tourism Strategy and Action Plan 2025-2030
Reflecting the priority attached to tourism and culture in the Regional Prospectus, the
Tourism Strategy and Action Plan sets out Perth and Kinross’ ambition to grow its tourism
economy and culture is a strong feature (both PTCH and CPK are members of the Tourism
Business Partnership).  
Physical Activity and Sports Strategy 2023–2028
This strategy sets out the Council’s ambitions to improve physical and mental health
outcomes by increasing levels of physical activity, particularly among children, older
adults, and communities facing barriers to access. It includes a strong emphasis on
community engagement, inclusive facility design, and low-carbon infrastructure.

Page 11

8 
PKC - GENERAL
Any revised ALEO structure must enable the delivery of these objectives through its
governance, resourcing, and service delivery approach such that it can better support
increased participation, reduced inequalities, and the Council’s net-zero targets through
investment and programming.
Culture Strategy 2023–2028
The Culture Strategy positions culture and creativity as central to inclusive economic
growth, education, mental wellbeing, and the Council’s wider regeneration and place-
making ambitions. It promotes access to culture for all residents and visitors, supports
community-led activity, and encourages partnership across sectors.
As cultural services (including performing arts) are currently delivered through ALEOs,
any revised model must be capable of supporting the Strategy’s ambitions. This includes
ensuring cultural access, enabling collaborative delivery, and supporting cultural
infrastructure that contributes to wider economic and wellbeing outcomes.
PH2O Leisure Development Project
PH2O is a major proposed capital investment in leisure and wellbeing facilities in Perth
city centre. It represents a significant redesign and consolidation of existing services, led
in partnership between the Council and Live Active Leisure.
The success of PH2O is directly tied to the governance and operational arrangements that
will follow this review. The appraisal must assess how different structural options could
support capital financing, long-term asset management, service integration, and risk-
sharing for a high-profile and high-value project.
Active Travel and Placemaking Initiatives
Perth and Kinross Council has invested in active travel infrastructure and place-making
initiatives that promote healthier lifestyles, community connection, and environmental
sustainability. These include cycle hubs, walkable routes, and integration of active design
into public spaces.
ALEOs delivering culture and leisure services must operate in alignment with these wider
objectives, maximising use of local assets and contributing to strategic outcomes related
to health, sustainability, and connectivity.

Page 12

9 
PKC - GENERAL
Active Schools and Physical Education, Physical Activity and Sport (PEPAS) Programmes
These Council-supported programmes aim to embed physical activity and sport into the
lives of young people by working in partnership with schools and community groups.
The ALEO structure must continue to facilitate, support, or partner with these
programmes. This may include opportunities to formalise relationships, improve
alignment, and ensure delivery is consistent with wider health and education goals.
2.2.2 Scottish National Policy Context
Community Wealth Building (Scottish Government)
Community Wealth Building (CWB) is a people-centred approach to local economic
development, which focuses on fair work, local procurement, inclusive ownership, and
making better use of public assets by harnessing the economic leverage of local ‘anchor’
organisations.
As anchor organisations, ALEOs can play a significant role in advancing CWB locally by
enabling greater retention of wealth in local communities through procurement practices,
community asset ownership, and workforce engagement.
Community Empowerment (Scotland) Act 2015
This legislation enhances the rights of communities to influence decisions about public
services and assets, including rights around participation and asset transfer. ALEO
governance must be responsive to these legal duties, facilitating community influence,
transparency, and accountability.
OSCR Guidance for ALEOs and Charities
Guidance from the Scottish Charity Regulator sets out how charitable ALEOs must
maintain independence, manage conflicts of interest, and demonstrate public benefit.
The guidance has significant implications for the legal status, financial arrangements, and
governance of ALEOs. The appraisal must examine whether moving to, continuing with or
departing from charitable status is compatible with desired outcomes.

Page 13

10 
PKC - GENERAL
Standards Commission Guidance on ALEOs (2024)
This guidance clarifies the responsibilities of elected members who serve on ALEO
boards, including expectations around ethical conduct, conflicts of interest, and
transparency.
Governance models must ensure that elected member involvement is appropriately
structured, well-supported, and compliant with national standards.
Audit Scotland – Councils’ Use of ALEOs (2018)
This national review evaluates how well councils manage ALEOs, highlighting risks around
oversight, transparency, performance monitoring, and financial management. It offers a
framework for identifying risks and improvement areas. 
2.2.3 UK-Wide Sector Benchmarking and Best Practice
Accounts Commission – "Are You Getting it Right?" (2016)
The Accounts Commission published this practical guide for setting up and managing
ALEOs, focused on good governance, public accountability, and value for money. It
provides a set of best practice criteria against which the Council can test the robustness of
different options during the appraisal process.
Community Leisure UK Sector Insights (2024)
A recent sector-wide review of the challenges and opportunities facing leisure and culture
trusts, including issues related to income recovery, digital delivery, and workforce
development. The report highlights trends, pressures, and innovations across the sector,
helping to contextualise ALEO performance and future-proof delivery models against
national patterns.
2.2.4 Conclusion
This policy and strategy review has ensured that the ALEO options appraisal is firmly
grounded in both the local strategic ambitions of Perth and Kinross Council and the
broader policy landscape in Scotland. It has taken into account key national priorities such
as community empowerment, community wealth building, public service reform, and the

Page 14

11 
PKC - GENERAL
transition to net zero – all these priorities are shaping how public services are governed
and delivered across Scotland.
By engaging with these frameworks in detail, the appraisal has ensured that the proposed
structural changes are legally sound, financially sustainable, and aligned with the
Council’s objectives around inclusive economic growth, health and wellbeing, climate
resilience, and local democratic accountability. 
This provides a strong foundation for implementing future delivery models for leisure,
culture, and performing arts services that are responsive to community needs, resilient to
future challenges, and consistent with evolving Scottish policy expectations.
2.3 Council Transformation Programme
The ALEO Review work takes place within the wider context of PKC’s Transformation
programme, itself governed by the Perth and Kinross Transformation and Change
Strategy 2022/23-2027/28 in line with the Council’s Corporate Plan. 
The Transformation and Change Strategy is designed to address the evolving needs of
PKC and its communities over a five-year period. It aims to create a fairer, more
prosperous, and sustainable future by aligning with the Scottish Government’s
commitments and addressing the many social, economic, and environmental challenges
faced by the Council now and in future.
Phase One, completed in June 2024, set the stage for more changes, and now Phase Two
will build on that success until 2027/28. This phase focuses on redesigning services,
managing risks, and engaging with stakeholders to ensure services runs efficiently.
A key part of this strategy is the ALEO Review, which looks at the governance, financial
health, and service quality of ALEOs linked to the council. The review will help inform
decisions in Phase Two, ensuring these services are efficient and sustainable in future.
Overall, the strategy and review aim to create a more efficient, responsive, and
sustainable council that meets the community's needs.
The strategy is not a standalone document but is supported by a wider strategic
framework that includes the Community Plan, Corporate Plan, and individual team plans.
The Corporate Plan 2022-27 sets out PKC's vision and corporate outcomes, which are

Page 15

12 
PKC - GENERAL
aligned with the council's values and designed to mitigate the impact of various
challenges over the next five years. The strategic outcomes are underpinned by seven key
priorities that outline the areas of greatest need that PKC can most directly influence. 
2.4 ALEO Review
The ALEO Review work in Perth and Kinross dates back to the pre-Covid period and may
have been driven, at least in part, by concerns over the financial and operating
performance at that time of PTCH.  
As far back as 2018, a review considered options for the establishment for a single
Cultural Trust to improve financial sustainability and operational effectiveness. Key
options considered included maintaining the existing setup or creating a single,
consolidated Culture Trust, with this option generally scoring higher in evaluations due to
potential operational efficiencies.
The recommendations also addressed governance issues, financial oversight, and
maximising the cultural sector’s economic and social impacts. These recommendations
were informed by challenges identified in the report, such as the need for integrated
service delivery, the importance of digital engagement to attract new audiences, and the
need for sustainable income generation beyond public funding. Concerns over financial
risk due to dependency on Council funding and inadequate long-term income
diversification were also highlighted as crucial areas for improvement.
Although these recommendations were accepted as part of a longer-term strategy for
transforming cultural services and supporting future growth in tourism and community
engagement within Perth and Kinross, there was no move toward a different model of
delivery. 
A paper to the Strategic Policy and Resources Committee in April 2019 focused on
advancing the Cultural Trusts Transformation Project. This initiative aimed to review and
reshape the operation of cultural services, including PTCH, to ensure sustainability and
alignment with council priorities. Specific recommendations included exploring potential
new operational models and securing long-term funding mechanisms to enhance cultural
offerings and operational efficiency across the Council's cultural assets.

Page 16

13 
PKC - GENERAL
The committee accepted a series of recommendations for further work including pursuing
the development of a business case for a single Cultural Trust. This set the stage for
further steps in restructuring and collaborative opportunities for cultural development
within Perth and Kinross. However, details on the specific operational models or financial
strategies considered were limited at this stage in public records. 
A year later in April 2020, a further paper to the Strategic Policy and Resources
Committee proposed: 
• a new governance and delivery structure for services currently delivered by ALEOs
including the insourcing of libraries, archives, museums and gallery collections
management to PKC and the establishment of a new streamlined ALEO for cultural
services. LAL would take on facilities management.
• investigation of wider efficiency / joint working potential.
• community stakeholder engagement on wider funding arrangements and
community participation.
• implementation of new third-party funding arrangements.
While these proposals were adopted by the Committee, it appears that the pandemic
disrupted progress. We also understand that differences in terms and conditions between
CPK and PTCH were also considered a barrier to structural change on the basis of cost. 
In April 2023, the ALEO Review was revisited, this time extending beyond the two cultural
ALEOs to also include consideration of LAL. A paper to Perth and Kinross Council in
December 2023 as a result of an external review by the organisation Audit Glasgow,
made twelve recommendations, as follows:
• from 2024/25, corporate functions across the three ALEOs should be consolidated
starting with finance, HR, facilities management and business conferencing.
• senior management structures should be reviewed in light of the above
consolidation.
• a review of employment issues should be undertaken to assess any potential risks.
• the ALEO property portfolio should be rationalised to ensure it is affordable and
sustainable.
• consolidation of the Perth sports offer onto a single site should be considered
based on evidence from the Leisure Assets Review.

Page 17

14 
PKC - GENERAL
• consolidation of key library provision to Community Campuses and the AK Bell
Library (this was subsequently reversed by PKC in February 2025 to be reviewed
again in 2027 as part of the Council’s budget setting process.
• consolidation of CPK and potentially PTCH storage facilities.
• expansion of support for the LAL Community Asset Transfer programme for
community halls.
• consider disposal of the Fergusson Gallery and William Soutar House.
• establish a shared finance function for the three ALEOs based on a single finance
system.
• move the ALEO contract monitoring/ compliance post to the corporate Strategic
Commissioning and Procurement Team.
• reinstate quarterly monitoring of ALEOs by the Scrutiny and Performance
Committee. 
These proposals were again approved by the Council and work has progressed to action
these, but progress on any structural change (e.g. consolidating corporate functions) has
been limited without the detail required to evidence the necessary changes. 
Further input has been provided by the report in 2023 by Audit Glasgow to support the
financial analysis and options for change element of the ALEO Transformation Review.
The report noted growing financial pressure on the ALEOs, not least as a result of
increasing staff costs without corresponding increase in the PKC service fee. A number of
recommendations were made mainly targeting issues with back office services (finance,
payroll and IT), governance and scrutiny and collaborative working across the three
organisations.

Page 18

15 
PKC - GENERAL
3 ALEOs
3.1 Introduction
This section provides an overview of each of the three ALEOs, covering: 
• Organisational structure, constitution and governance.
• Assets under management.
• Funding and financial performance. 
3.2 Live Active Leisure (LAL)
3.2.1 Background History
Live Active Leisure (LAL) was founded on 1 October 1965 as Bell's Sports Centre (Perth)
Ltd. The organisation emerged from a collaborative initiative between the Lord Provost of
Perth and the chairman of the Gannochy Trust to enhance public access to sport and
recreational opportunities. Bell's Sports Centre opened in 1968 and quickly became a
regional landmark due to its distinctive laminated timber dome roof. Over the decades,
Bells Sports Centre (Perth) Ltd. evolved into a charitable trust with a strategic focus on
increasing community engagement in physical activity. Key milestones include:
• 1983 - Perth & Kinross Recreational Facilities (PKRF) created when Perth Leisure
Pool (PLP) was built. 
• 2000 – establishment of Perth & Kinross Leisure (PKL). 
• 2010 - development of the Live Active brand and Company rename to Live Active
Leisure (LAL).
By 2015, LAL had become the UK's longest-running leisure trust, commemorating 50
years of service to the Perth and Kinross area.

Page 19

16 
PKC - GENERAL
As outlined in the company’s charitable purposes, LAL is focussed on:
• the advancement of public participation in sport.
• the provision of recreational facilities, or the organisation of recreational activities,
with the object of improving the conditions of life for the persons for whom the
facilities or activities are primarily intended.
These objectives are designed to benefit children and young people, older adults, people
with disabilities, individuals with health issues, and the general public throughout Perth
and Kinross.
3.2.2 Governance and Management
LAL operates under the oversight of a voluntary Board of Directors comprising
representatives from the local community and Perth & Kinross Council. The Council
retains ownership of the company as its sole member and designates up to three elected
officials to serve on the Board. The company has an independent Chair and two Vice-
Chairs. 
The Senior management is led by the Chief Executive Officer, supported by a senior team
responsible for operational and strategic delivery:
This management team oversees approximately 380 staff and ensures the organisation’s
strategic goals are implemented efficiently across its extensive facility network. The dual-
tiered governance structure ensures robust accountability and effective service delivery.

Page 20

17 
PKC - GENERAL
Figure 3.1: LAL Staff Structure 
Chief Executive
Officer
Head of Business
Development
Service Manager
Physical Activty and
Sport
Wellbeing Manager
Wellbeing Officers
Outdoor Activites
Officer
Sports
Development
Officers
Sport Specific
Development
Officers (Cricket,
Football)
Active Schools
Manageer
Active Schools
Coordinators
Activity
Programming and
Fitness Manager
Programme
Development
Officer
Fitness
Development
Officer
Communications
and Marketing
Manager
Marketing
Coordinators
Head of Corporate
Support Services
HR and Admin
Officer
Training Officer
Board and
Committee
Adminstrator
Head of Finance
Finance Manager
Finance Team
Information and
Business Systems
Coordinator
Business Systems
Assistant
Head of
Operational
Services
Compliance
Manager
Maintenance
Supervisor
Maintenance
Operatives
Operational and
Business Support
Manager
Project Officer Operations
Managers *4
Venue Teams

Page 21

18 
PKC - GENERAL
3.2.3 Assets
LAL administers a diverse portfolio of facilities across the Perth and Kinross region,
comprising:
• Perth Leisure Pool: A flagship aquatic facility offering competitive and leisure
pools, a fitness gym, and wellness amenities.
• Dewars Centre: A multifunctional complex featuring an ice rink, health and fitness
facilities, including gym and studios 
• George Duncan Athletics Arena: An outdoor track and field stadium supporting
both community and competitive athletics.
• Community Campuses: Integrated sports facilities within educational campuses:
o Glenearn Community Campus
o North Inch Community Campus
o Breadalbane Community Campus
o Blairgowrie Community Campus
o Strathearn Community Campus
o Loch Leven Community Campus
• Local Leisure Centres: 
o Live Active Loch Leven
o Live Active Atholl
o Live Active Blairgowrie
• Community Halls:
o Moncrieffe Community Centre
o Scone Public Hall
o Tulloch Community Centre
o Moray Institute
o Aytoun Hall
o Dunning Village Hall
These assets support LAL’s mission to promote health and wellbeing through accessible,
high-quality physical activity environments, serving both urban and rural communities.

Page 22

19 
PKC - GENERAL
3.2.4 Funding Model
Typically, 40% to 50% of LAL's income is derived from Council support, with the
remainder generated through commercial activities and external funding that includes:
• Commercial Revenue: Income streams include user memberships, pay-per-use
fees, facility rentals, instructor-led classes, and on-site retail operations.
• Grant Funding and Strategic Partnerships: Financial support is secured from
organisations such as sportscotland, NHS Tayside, and the Gannochy Trust, which
fund targeted initiatives and capital developments.
• Inclusive Pricing Models: Programmes like the "Compass" membership offer
reduced-cost access to underrepresented and financially vulnerable populations.
Table 3.1, over, provides a summary of the income and expenditure for LAL from
2021/22 to 2025/26
Key points to note include are that LAL is forecast to post a deficit of £270k in 2024/25
which is budgeted to reduce by almost 80% in 2025/26, and the PKC Service Fee is also
expected to be almost £90k lower than in 2023/24. 
Income has been impacted with loss of services from the Bells Centre – it is now starting to
recover with the relocation of gym facilities within the Dewars Centre which accounts for
the projected operating income growth in the 2025/26 budget figure.
Energy costs continue to put pressure on the business with gas and electricity costs
increasing by 152% and 104% respectively. Staff costs have increased substantially from
2021/22 (25%), mainly due to the implementation of Real Living Wage Employer status
and National Insurance increases – staff costs are budgeted to continue to grow in
2025/26.

Page 23

20 
PKC - GENERAL
Table 3.1: Consolidated Income and Expenditure for LAL 2021/22 to 2025/06 (budget) 
Source: LAL Accounts, LAL Budget papers, PKC Scrutiny Committee Papers
3.2.5 Impact
LAL’s operations generate measurable social and economic impacts, aligned with
broader local authority priorities as summarised below with more details in LAL’s
Achievement and Impact Report (2022-2024):
• Health and Wellbeing Promotion: Evidence-based interventions support
physical rehabilitation, mental wellness, and prevention of lifestyle-related
conditions through structured activity programmes.
• Social Inclusion: Tailored outreach and financial assistance schemes ensure
equitable access to physical activity for marginalised groups, including individuals
in rural areas and those with additional needs.
• Youth Engagement and Development: The Active Schools initiative provides
structured opportunities for children and adolescents to engage in sports,
fostering leadership, confidence, and long-term engagement in physical activity.
• Community Integration: Facilities serve as focal points for community interaction,
supporting volunteerism, club development, and event hosting that reinforce local
identity and cohesion.
Category 2021-22 2022-23 2023-24
2024-25
forecasted
outrun
2025-26
Budget
Income
Operating Income 4,813,639        4,280,447        4,614,463        4,084,433          4,974,630        
Services to PKC 4,645,173        4,653,406        4,771,842        4,706,400          4,683,272        
Grant Funding 959,475           732,142           730,934           780,933             777,877           
Other Income 87,265             204,661           380,155           344,200             231,376           
Income Total 10,505,552   9,870,656     10,497,393   9,915,967       10,667,155   
Expenditure
Cost of Sales 33,053             87,095             71,969             66,071               73,440             
Staff Costs 5,517,887        6,356,638        6,869,628        6,703,754          7,345,063        
Supplies & Services 709,203           896,349           1,005,503        986,219             1,028,228        
Property Costs 3,477,119        2,571,285        2,340,326        2,253,278          2,001,239        
Grants Awarded 125,276           190,962           176,751           177,209             277,877           
Exoenditure Total 9,862,538     10,102,330   10,464,176   10,186,530     10,725,847   
Surplus/Defecit 643,014 -231,673 33,217 -270,563 -58,692

Page 24

21 
PKC - GENERAL
• Local Economic Contribution: Employing over 380 staff and attracting significant
footfall, LAL contributes to job creation, local spending, and regional tourism.
By delivering inclusive, evidence-informed services, Live Active Leisure supports Perth &
Kinross Council’s objectives to reduce health inequalities and foster a culture of active
living. The organisation remains a pivotal stakeholder in regional health, wellbeing, and
community development.
3.2.6 Issues for Consideration
Based on the review of information provided and consultation with LAL Board members
and Leadership Team, there is a number of issues pertinent to the option appraisal work:  
• Rising staff and energy costs, including the move to the Real Living Wage, and now
the increase in Employers’ National Insurance, have added significantly to the
organisation’s costs. 
• LAL has been working with PKC on a Strategic Facilities Review which is looking at
the replacement of Perth Leisure Pool and The Dewars Centre as well as potential
redevelopment and upgrades of other facilities. This process has been ongoing for
some time and led to lack of investment in current facilities.
• Whilst income generation has remained flat, it should be noted that this is with the
backdrop of facility closures at Bells (flooding) and the redevelopment of
Blairgowrie (old venue still open but the infrastructure is old and the offer
declining) representing a significant reduction in available facilities, but LAL is clear
that there is a need to continue to develop commercial income to continue to meet
increasing costs and savings expectations. The improved facility offerings as a
result of the Strategic Asset Review with fewer buildings and improved energy
efficiency will be critical to future sustainability. At present, the proposal will see
the merging of two City Centre sites with a budgeted operating deficit of £1.6m
into one new building (PH20) with a projected operating deficit of £1.2m creating
the opportunity for significant saving.
• LAL staff are not on the same terms and conditions as those in either PTCH or CPK.
LAL is an admitted body for the Local Government Pension Scheme and therefore,
aligning these would result in significant additional costs.    
• LAL works unsocial hours (evenings and weekends) during which some back-office
support is required e.g. IT.

Page 25

22 
PKC - GENERAL
• Shifting LAL into the council would result in loss of non-domestic rates relief on
buildings. 
• There are multiple property arrangements in place from LAL ownership ((Perth
Leisure Pool, Dewars Centre, Live Active Atholl, Live Active Loch Leven and Live
Active Strathearn) to leasing and other management arrangements. This is
complicated to manage and could potentially become more complicated with the
addition of more assets. 
These issues have been taken into account in appraising the proposed options.   
3.3 Culture Perth and Kinross (CPK)
3.3.1 Background History 
Culture Perth and Kinross (CPK) was established in 2016 as an independent charitable
trust to deliver library, museum, archive, and cultural services on behalf of PKC. The
creation of CPK followed a strategic review of cultural service delivery models, with a view
to ensuring long-term sustainability, increasing community engagement, and enabling
access to a broader range of funding opportunities. The organisation was formed by
transferring staff, assets, and responsibilities from PKC into a new charitable entity.
The charitable purposes of CPK include:
• the advancement of education, arts, culture, and heritage.
• the provision of public library services and promotion of reading and literacy.
• the care, preservation, and interpretation of cultural and historical collections.
• the promotion of social inclusion through access to cultural resources and
learning.
CPK’s remit includes management of management of 15 key cultural venues such as Perth
Museum, Perth Art Gallery, the AK Bell Library and a range of community libraries.
3.3.2 Governance and Management 
Culture Perth and Kinross is governed by a Board of Trustees comprising individuals from
a range of professional and community backgrounds, selected for their experience and

Page 26

23 
PKC - GENERAL
expertise in culture, business, education, and community development. Perth & Kinross
Council has representation on the Board.
CPK’s executive leadership is headed by a Chief Executive, supported by a Senior
Management Team which oversees functions including operations, collections, public
programmes, learning, digital development, and income generation. The organisational
structure reflects its dual commitment to service delivery and innovation across heritage,
culture, and library services.

Page 27

24 
PKC - GENERAL
Figure 3.2: CPK Staff Structure 
Library Support
Services Officer 
1FTE
Events 
Co-ordinator
1FTE
Local and
Family History
Officer 1FTE
Programme 
Manager 
1FTE
Libraries
Manager
1FTE
General
Manager
1FTE                                                                           
Snr Opps
Officer 
1 FTE                           
-          
Exhibitions
Assistant
1FTE
Library
Supervisors  
Design and
Publicity Officer 
1FTE                                   
FGIC Technologist
in Residence
1 FTE                                                       
Head of Audiences and Engagement  
1 FTE
Head of Support and Contracts  
1FTE
Head of Museums and Collections  
1FTE                                 
-                            
Collections
Officers  
3 FTE
Exhibitions
Officer
1FTE
Marketing
Officer
1FTE
IT Supervisor
1FTE

Page 28

25 
PKC - GENERAL
3.3.3 Assets 
Culture Perth and Kinross is responsible for the operation and curation of a portfolio of
cultural facilities and collections, including:
• AK Bell Library: The main library and headquarters of CPK, offering extensive
reference and lending services, digital access, and community learning.
• Perth Museum: The new Perth Museum opened its doors on Saturday, 30 March
2024 after a £27 million redevelopment project. This world-class cultural and
heritage attraction highlights the fascinating objects and stories that put Perth and
Kinross at the centre of Scotland’s story. At the heart of the museum sits the Stone
of Destiny, also known as the Stone of Scone, one of Scotland and the UK’s most
significant historical objects. 
• Perth Art Gallery: One of the UK’s oldest collections  featuring works from
influential Scottish artists and now the home of the Fergusson Collection.
• Local Libraries: Operated in communities across Perth and Kinross:
o Blairgowrie Library
o Auchterarder Library
o Breadalbane Community Library
o Kinross Library
o Scone Library
o Strathearn Community Library
o Loch Leven Community Library
o Comrie Library
o Birnam Library
o Pitlochry Library
o Alyth Library.
• Local and Family History Services Offering public access to documents and records
of local significance based in AK Bell Library.
CPK also stewards museum and art collections, all of which are nationally recognised for
their significance.

Page 29

26 
PKC - GENERAL
3.3.4 Funding Model 
CPK operates on a mixed funding model that includes:
• Annual Service Fee: Provided by Perth & Kinross Council to support core library
and museum operations.
• Earned Income: Derived from commercial activities such as venue hire, retail sales,
events, exhibitions, and café operations.
• Grant Funding: CPK is active in securing funding from national agencies including
Creative Scotland, Museums Galleries Scotland, the National Lottery Heritage
Fund, and others.
• Philanthropy and Sponsorship: Targeted fundraising campaigns and strategic
partnerships support exhibitions, educational projects, and capital developments.
Over 90% of CPK’s income is provided by PKC, with the remainder coming from external
funding sources and some modest earned income. Table 3.2, outlines CPK’s income and
expenditure over the last three years with forecast and budget information for 2024/25
and 2025/26 respectively.
Table 3.2: Consolidated Income and Expenditure for CPK 2021/22 – 2025/26 
Source: CPK Accounts, PKC Scrutiny Committee Papers
The financial pressure on the organisation is evident, with consistent increases in staff
costs, set nationally by COSLA, and in the costs of supplies and services. These have
combined to turn a surplus in 2021/22 into a deficit by 2022/23. The deficit is forecast to
be particularly large in 2024/25 due mainly to a sharp increase in staff costs associated
Category 2021-22 2022-23 2023-24 2024-25
forecasted
outturn
2025-26 Budget
Income
PKC Service Fee 3,178,116           3,219,116          3,392,116       3,919,116            3,995,116            
Donations and Legacies 14,151                22,618               35,632            78,100                 80,000                 
Income from Charitable Activities 35,143                162,691             95,703            194,695               176,840               
Other Income 19,419                54,858               138,779          134,203               138,512               
Total Income 3,246,829        3,459,283       3,662,230    4,326,114         4,390,468         
Expenditure
Staff Costs 2,467,991           2,801,568          3,102,644       3,940,158            3,546,700            
Property Costs 76,490                83,364               81,624            114,480               80,819                 
Supplies and Services 380,360              410,263             426,913          597,610               691,500               
Transport Costs 99,399                95,641               86,354            70,252                 73,466                 
Bank Charges 1,616                  1,184                 1,600              10,925                 15,000                 
Governance Costs 37,099                47,725               52,525            62,529                 55,471                 
Total Expenditure 3,062,955        3,439,745       3,751,660    4,795,954         4,462,956         
Surplus/ Deficit 183,874            19,538             89,430-          469,840-            72,488-

Page 30

27 
PKC - GENERAL
with the payment of historic back pay and the opening of the New Museum, budgeted to
reduce again in 2025/26. Income other than the PKC Service Fee is modest and there is
limited scope for further income generation when core services are free at the point of
access.  
3.3.5 Impact 
Culture Perth and Kinross delivers wide-ranging cultural, educational, and social benefits
across the region:
• Lifelong Learning and Literacy: Through libraries, digital access points, and
outreach, CPK supports reading, digital inclusion, and learning for all ages.
• Cultural Heritage: The preservation, exhibition, and interpretation of artefacts and
records fosters a strong sense of identity and place.
• Tourism and Economic Development: Cultural venues contribute to the visitor
economy, drawing residents and tourists alike.
• Wellbeing and Social Inclusion: Cultural programming is designed to address
issues of isolation, intergenerational engagement, and community cohesion.
• Digital Innovation: CPK has invested in digital storytelling, collections access, and
virtual programming, expanding its reach and relevance.
Through its blend of cultural stewardship and public service, CPK supports Perth and
Kinross Council’s aims in education, regeneration, and community wellbeing.
3.3.6 Issues for Consideration 
From engagement with CPK’s leadership team, external stakeholders, and review of
organisational data, several key issues have been identified that influence future planning:
• ongoing pressures from inflation and staffing costs have tightened budget
flexibility, even as demand for services increases.
• staff salaries remain tied to local authority increases, but no allowance in staff costs
inflation in the annual PKC grant has led to a (reported) real terms decrease of 48%
in the grant’s value since 2015.

Page 31

28 
PKC - GENERAL
• income generation from commercial activities remains constrained by physical
space and infrastructure limitations in key buildings. Also, the free nature of the
services (libraries, museums) limits the opportunities for income generation.
• collections storage is under significant pressure, with off-site storage needs
competing with access and conservation requirements.
• the redevelopment of Perth City Hall and associated museum development
required significant transitional planning and staffing resource. Reallocation of
staffing across the service was required to ensure the expenditure bottom line
remained unchanged. 
• capital investment is needed to maintain or upgrade community libraries and
ensure digital infrastructure meets public expectations.
• proposed library closures in rural areas led to strong community response and
adverse media attention. The rationale and options for the closures, agreed in the
Review of 2023 (see p12), remain a subject of debate. In February 2025, PKC
reversed this decision for review in 20278. 
• footfall recovery/lending levels are recovering well post-COVID in all facilities with
many facilities now exceeding pre-Covid footfall.
• the opening of the Perth Museum(previously Perth City Hall) in 2024 has
dramatically increased overall visitor figures and resulted in high levels of positive
national media profile.
• the quality of development/engagement work remains high although there are
capacity issues around quantity of activity versus potential demand.
There is scope to develop further the strategic relationship between PKC and CPK with a
joint mission, shared objectives, and potential for shared delivery.
Any structural changes to CPK’s status would need to consider the management of
nationally significant collections and the potential implications for charitable status and
funding eligibility.
These issues have been taken into account in appraising the proposed options.

Page 32

29 
PKC - GENERAL
3.4 Perth Theatre and Concert Hall (PTCH)
3.4.1 Background History
Horsecross Arts Limited was established in 2006 to run Perth Concert Hall and to refresh
and reposition Perth Theatre, Scotland’s oldest repertory theatre company. 
In 2013, new Articles of Association were adopted whereby Perth and Kinross Council
became the sole member of the company. The charitable objects of the company are to:
• advance education by the encouragement of the performing arts by means of
production, presentation, collection, exhibition, collaboration, education and
training in the performing arts. 
• run arts development and arts education programmes in theatre, music and new
media public art in Perth and elsewhere which will promote and encourage
creativity, skills development, social and personal development, social inclusion
and lifelong learning but only as long as such activities are regarded as charitable
in law.
Horsecross Arts Limited has a wholly owned subsidiary, Horsecross Trading Limited,
established to generate funds to support the parent charity. In 2022, the Trustees took the
decision to conduct all activities under the trading name of Perth Theatre and Concert
Hall (PTCH).   
3.4.2 Governance and Management
PTCH has a Board of 12 Trustees, acting in a voluntary capacity, with fiduciary
responsibility for safeguarding the assets of the charity. Perth and Kinross Council has the
right to appoint up to three Elected Members of the Council to serve on the Board. The
Chair and Vice Chair of PTCH are independent (i.e. not council appointees). Independent
trustees bring a diverse set of skills and experience including performing arts and theatre
management, communications, HR, legal and commercial business.

Page 33

30 
PKC - GENERAL
Perth and Kinross Council and Creative Scotland can attend the Board meeting as
observers and receive Board papers and minutes. The Board meets at least four times a
year and has a number of Committees which meet to coincide with the cycle of Board
meetings:
• Finance and General Purposes Committee.
• Nominations Committee.
• Business Development Committee.
• People Committee.
PTCH works with Perth and Kinross Council to develop programmes of activity in line with
the organisation’s charitable objectives and the priorities of the Council. Otherwise, Perth
and Kinross Council maintains an arms-length relationship with PTCH (although it does
retain the power to remove Trustees in exceptional circumstances).  
The Executive Team comprises the Director supported by both:
• a Leadership Team which includes the Director, Director of Commercial
Operations, Director of Finance and HR, and Director of External Relations.
• a Senior Management Team which includes the Media Relations Manager, Theatre
General Manager, Head of Learning and Engagement, Head of Technical Services,
Head of Events and Commercial Development and Head of Contemporary,
Classical and Theatre Programming.    
Following a difficult period of poor trading performance, PTCH was placed by Perth and
Kinross Council into ‘Special Measures’ leading to significant changes at Board and Senior
Management levels. This was followed by the Covid-19 pandemic during which the
organisation undertook a wider restructure which led to further changes in staffing
numbers (a significant reduction in overall headcount) and subsequently at Senior
Management and Board levels. 
The period since the pandemic has brought greater stability and a refreshed vision and
approach to programming and wider operations, including growth in commercial income
and fundraising performance as well as increased audiences. 
The senior team was also restructured in 2023 with the deletion of the previous Artistic
Director post, the creation of the new Director of Commercial Operations position, and a

Page 34

31 
PKC - GENERAL
change for the CEO to Director with an enhanced role in artistic programming. This was
done with a view to enabling a new approach to artistic programming.  
The PTCH staff structure is shown below.
Figure 3.3: PTCH Staff Structure 
Source: PTCH
3.4.3 Assets
PTCH manages two properties owned by PKC:
• Perth Theatre: founded in 1900, Perth Theatre reopened in 2017 following an
extensive period of restoration and redevelopment costing approximately £16.6m.
The venue houses a traditional Victorian auditorium (with proscenium arch), new
studio theatre, dedicated community rooms, café, and spacious public areas. 
• Perth Concert Hall: opened in September 2005 following a £12.3m capital build
project, the venue boasts world leading acoustics in its 1,200-capacity auditorium.

Page 35

32 
PKC - GENERAL
3.4.4 Funding Model
The two principal funders of PTCH are PKC and Creative Scotland. PKC provides PTCH
with annual funding in the form of a service fee (of just under £1m per annum plus an
additional separate payment from the COSLA pay award) governed by a Service Level
Agreement (SLA). The SLA sets out the responsibilities of each party as follows:
• PKC retains responsibility for property maintenance.
• PTCH is required to deliver diverse programme across the performing arts with a
primary focus on music and drama.  
The SLA also specifies a range of Key Performance Indicators (KPIs) that PTCH is required
to deliver, which include measures relating to numbers of performances, audiences,
community and learning activities and participants and commercial activities (mainly
conferences and events). It does not include specific financial targets although the service
fee is reducing by 12% over a three-year period. 
Following a successful application to Creative Scotland’s new multi-year funding
programme, PTCH secured an increase in their annual grant for 2025/26 to c. £736K, an
increase of c. 38%.  
In addition, PTCH also has a strong track record of securing funding from a range of
sources including trusts and foundations with core and project funding from the
Gannochy Trust to support staff costs for community and learning activities. The
organisation has also benefitted from additional funding from PKC for capital works and
to support activities to celebrate the forthcoming 125th year anniversary of the theatre and
20th anniversary of the Concert Hall. 
Table 3.3 provides a summary of the income and expenditure for PTCH over the last
three years with forecast data for 2024/25 and the budget for 2025/26.

Page 36

33 
PKC - GENERAL
Table 3.3: Consolidated Income and Expenditure for PTCH 2021/22 to 2025/06
(budget) 
Source: Integratis/ EKOS analysis of PTCH data
Note 1: Other grant income includes new funding from Trusts, including from Garlfield Weston, Hugh Fraser
Foundation and Wolfson Foundation and a significant uplift in 2025/26 from the Gannochy Trust
Note 2: Breakdown of governance costs not available for 2024/25 and 2025/26
A number of points are worth noting:
• 2021/22 cannot be considered a typical year as this was still impacted by the
pandemic with reduced levels of performance and trading activity offset by grant
income relating to Covid emergency funding (PTCH was successful in securing
funding support through the pandemic).  
• there has been a reduction in grant income and income from donations and
legacies but 2021/22 is skewed by the Covid emergency funding. Funding from
Creative Scotland increases in 2025/26.  
• trading income from charitable and commercial activities has increased indicating
good recovery post-Covid and renewed emphasis on income generation. Income
from productions and performances has shown consistent growth in line with the
organisation’s plans.
• staff costs (2024/25 forecast) have increased by almost 60% since 2021/22 but this
again reflects the downturn in activity with the pandemic. The increase between
2023/24 and 2024/25 was 15%. However, PTCH reports that its total staff is around
two thirds pre-pandemic levels. 
Category 2021-22 2022-23 2023-24 2024-25
forecasted
outturn
2025-26
Budget
Grant Income
PKC Service Fee 1,062,480           1,062,480     1,062,480    1,018,730           1,015,880         
Creative Scotland Revenue 553,481              533,333        533,333       533,445              736,046            
Other Grant/ Donations Income1 1,121,822           613,214        290,997       298,220              366,000            
Total Grant Income 2,737,783        2,209,027  1,886,810  1,850,395         2,117,926      
Production and Performance Income 856,113              2,193,913     2,069,520    2,352,475           2,361,606         
Creative Learning and Community Projects 21,888                39,900          37,524         61,458                55,000              
Other retail, merchandising and Commission income 190,166              486,819        490,660       453,321              381,722            
Sponsorship income -                     -                -               66,546                150,000            
Company Catering Sales 215,985              678,592        730,711       840,597              952,857            
Total Earned Income 1,284,152        3,399,224  3,328,415  3,774,397         3,901,185      
Total Income 4,021,935        5,608,251  5,215,225  5,624,792         6,019,111      
Expenditure
Staff Costs 1,666,089           2,162,949     2,312,003    2,650,993           2,809,708         
Governance Costs2 70,002                102,572        143,848       n/a n/a
Other Operating Costs 1,975,183           3,182,882     2,986,490    3,223,148           3,387,998         
Total Expenditure 3,711,274        5,448,403  5,442,341  5,874,141         6,197,706      
Suplus/ Deficit 310,661           159,848      227,116-     249,349-            178,595-

Page 37

34 
PKC - GENERAL
• The organisation posted a deficit in 2023/24 following two years in surplus. This is
down to increased costs, particularly staffing costs. This is partly attributable to the
organisation moving to the Real Living Wage as part of the conditions for the
Creative Scotland multi-year funding.  
PTCH set a target to increase income generation to address the 2023/24 deficit position.
However, despite exceeding this income target, the organisation is still forecasting a
deficit in 2024/25 due to increases in staff costs (as a result of the Real Living Wage) and
energy costs along with ongoing challenges in securing trusts and foundations income
(which is not specific to PTCH but is rather a national trend). 
Despite growing audiences, PTCH still faces the challenge of increasing ticket income
through the sale of full price tickets rather than concessions. However, this needs to be
balanced against the organisation’s community responsibilities and its contribution to
Council priorities.  
3.4.5 Impact
2023/24 was a record year for PTCH:
• over 135,000 tickets were sold for 510 performances spanning classical and
contemporary music, theatre, comedy, dance and film.
• 43% of bookers were first time attendees and 14% were from areas of high
deprivation in Scotland (defined using the Scottish Index of Multiple Deprivation’s
20% most deprived datazones).
• there were 19,631 visitors to conferences and events and over 10,000 participants
in learning and engagement work. 
• there were also almost 35,000 other building users (café, meetings rooms,
exhibition spaces etc). 
PTCH report that these activities contributed to the organisation generating a direct
economic impact of £16.9m in 2023/24. For Perth and Kinross Council this means that
each £1 of investment in PTCH returns more than £16 in economic impact for the region.

Page 38

35 
PKC - GENERAL
3.4.6  Issues for Consideration
Based on the review of information provided and consultation with PTCH Board members
and Leadership Team, there is a number of issues pertinent to the option appraisal work:  
• PTCH is differentiated from comparable local authority performing arts venues in
two principal ways: it is a producing theatre and not solely a receiving house; and
the combination of a producing theatre and concert hall is almost unique in the
UK. 
• the organisation has worked hard to recover from both the pandemic and its pre-
Covid difficulties and is now working to a clear plan to revitalise the artistic and
community programme, grow commercial and other income and develop a
sustainable model for the two venues.
• extensive restructuring during and immediately after the Covid period significantly
reduced staff headcount and resulted in a leaner and more focussed organisation. 
• more recently, rising staff and energy costs, including the move to the Real Living
Wage, and now the increase in Employers’ National Insurance, have added
significantly to the organisation’s costs. These additional costs effectively negated
the impact of the recent income growth on the organisation’s deficit position. 
• there are capital investment needs at both venues, particularly for the Concert Hall,
and PKC has committed an initial £2.8m to these works. More will be required in
due course and PTCH can raise capital funding from sources not available to the
council.
• income growth has been good, but PTCH is clear that there is a need to continue
to develop commercial income through conferences and events, full price ticket
sales and trusts and foundations. This is the primary focus for PTCH in working with
PKC to reduce the overall level of subsidy required.  
• PTCH staff are not on the same terms and conditions as those in either LAL or CPK.
PTCH is not an admitted body for the Local Government Pension Scheme (CPK
and LAL are). Aligning these would result in significant additional costs to PTCH,
although this must be balanced against the risks of equal pay claims. 
• PTCH has some specific needs in relation to support services such as HR and
finance as the organisation works with a large freelance labour pool which requires
different contractual conditions and prompt payment terms. Similarly, many
concert promoters require payment within 48 hours.

Page 39

36 
PKC - GENERAL
• PTCH has external HR support and a different finance system (Xero) to those used
by LAL and CPK. Both are considered to be very lean operations (there are three
people in the Finance team).  
• the finance team at PTCH has developed specialist expertise in securing Theatre
Tax Relief, an important source of additional income. 
• PTCH works unsocial hours (evenings and weekends) during which some back-
office support could be required e.g. IT.
• shifting PTCH into the council could risk the loss of Creative Scotland funding (or
require a re-application). This is an existential risk to the business. This is also a risk
under options which result in the creation of a new ALEO. 
• similarly, shifting PTCH into the council would result in loss of non-domestic rates
relief on the two buildings. 
• there are some concerns that merging with leisure services, museums and libraries
could risk loss of expertise specific to the PTCH business (for example, through the
creation of a single board or reduction in senior management).
• there are also concerns about options which could result in dilution of the PTCH
brand amongst the community – something that the organisation has worked hard
to establish (including with the move to the PTCH trading name). 
• issues were raised about the current level of reporting burden and the amount of
management time that this requires. 
These issues have been taken into account in appraising the proposed options.

Page 40

37 
PKC - GENERAL
3.5 Consolidated Overview
We have collated the finances for the three ALEOs together to provide a consolidated
picture of financial performance. This is shown in Table 3.4, over. 
In 2023/24, the combined deficit of the three ALEOs was just under £380K with this
forecast to rise to almost £1m in 2024/25 before reducing again in 2025/26 to c. £300K.
At the same time, the total management fee paid by PKC is forecast to increase slightly for
CPK while reducing for the other two ALEOs.
While all are forecast to increase their deficit in 2024/25, this is particularly marked for
CPK and to a slightly lesser extent LAL. Income at CPK and PTCH is forecast to rise in
2024/25 while it reduces at LAL. However, income growth for CPK and for PTCH is offset
by a larger rise in expenditure, while costs are forecast to reduce at LAL.   
While the 2025/26 figures estimate some improvement, these are budget figures only at
this stage and are still predicated on significant increases in income for LAL and PTCH. For
CPK, a modest increase in the PKC management fee is budgeted. 
This suggests that while the overall financial picture is not getting significantly worse,
substantial improvement (i.e. reduction in the level of subsidy required) appears some
way off. 
It is also worth noting here that PKC has expressed some concerns regarding the
differences in staff terms and conditions across the three ALEOs, particularly in relation to
the potential for equal pay claims. However, this is not a new risk and to date there have
been no claims raised in respect of either LAL or PTCH (CPK is now aligned to PKC).

Page 41

38 
PKC - GENERAL
Table 3.4: Financial Summary all ALEOs 2021/22 to 2025/26   
Cost Centre Organisation 2021-22 2022-23 2023-24 2024-25 forecasted outturn 2025-26 Budget
Income Live Active Leisure £10,505,552 £9,870,656 £10,497,393 £9,915,967 £10,667,155
Income Culture Perth & Kinross £3,246,829 £3,459,283 £3,662,230 £4,326,114 £4,390,468
Income Perth Theatre & Concert Hall £4,021,935 £5,608,251 £5,215,225 £5,624,792 £6,019,111
Income Total £17,774,316 £18,938,190 £19,374,848 £19,866,873 £21,076,734
Expenditure Live Active Leisure £9,862,538 £10,102,330 £10,464,176 £10,186,530 £10,725,847
Expenditure Culture Perth & Kinross £3,062,955 £3,439,745 £3,751,660 £4,795,954 £4,462,956
Expenditure Perth Theatre & Concert Hall £3,711,274 £5,448,403 £5,442,341 £5,874,141 £6,197,706
Expenditure £16,636,767 £18,990,478 £19,658,177 £20,856,625 £21,386,509
Net Expenditure Live Active Leisure -£643,014 £231,673 -£33,217 £270,563 £58,692
Net Expenditure Culture Perth & Kinross -£183,874 -£19,538 £89,430 £469,840 £72,488
Net Expenditure Perth Theatre & Concert Hall -£310,661 -£159,848 £227,116 £249,349 £178,595
Net Expenditure Total -£1,137,549 £52,287 £283,329 £989,752 £309,775
Management Fee Live Active Leisure £4,645,173 £4,653,406 £4,771,842 £4,706,400 £4,683,272
Management Fee Culture Perth & Kinross £3,178,116 £3,219,116 £3,392,116 £3,919,116 £3,995,116
Management Fee Perth Theatre & Concert Hall £1,062,480 £1,062,480 £1,062,480 £1,018,730 £1,015,880
Management Fee Total £8,885,769 £8,935,002 £9,226,438 £9,644,246 £9,694,268

Page 42

39 
PKC - GENERAL
4 Options
4.1 Introduction
Through the previous work on the ALEO Review, a number of possible structural options
have emerged through which the services provided by the three ALEOs could be
delivered. These were set out in the brief for the current appraisal. 
Here, each option is outlined in more detail, with a high-level summary of the pros, cons
and any specific issues for consideration raised with each option. Further appraisal of
each of the options is provided in Section 5. 
The options are as follows:
• Option 1: Bring all ALEOs in house to PKC.
• Option 2: Bring some ALEO services in house (e.g. consolidation of corporate
services from ALEOs delivered by PKC) and ALEOs retain own identity / library
services brought back into PKC.
• Option 3: Create one new ALEO / two new ALEOs – streamlining corporate and
back office services.
• Option 4: Create one ALEO for culture and sport and considering possible
change of status for Perth Theatre and Concert Hall.
4.2 Option 1: In House
Under Option 1, all services currently delivered by the three ALEOs would be delivered
instead by PKC directly. The three ALEOs would then be wound up and closed. This
would require the transfer of staff from each of the three ALEOs into the Council (under
TUPE regulations) and would also likely require equalisation of staff Terms and Conditions
in line with the Council. This would add to the total staff costs but would mitigate the risks
of equal pay claims. Also, a move to a single delivery structure would create opportunities
for some rationalisation of staff positions achieving savings. There would also be
opportunities to move support services such as IT onto a single system within PKC. These
issues are considered in more detail in the appraisal section that follows.

Page 43

40 
PKC - GENERAL
Other issues raised by this option are:
• A move to Council delivery would result in the loss of the non-domestic rates that
the ALEOs currently receive on the facilities under management. This could add as
much as £2.7m to combined annual costs (not all ALEOs have full rates relief).  
• Councils cannot access the same range of external funding available to ALEOs,
including support from trusts and foundations. There is also some uncertainty
about what this option might mean for the multi-year funding support that PTCH
receives from Creative Scotland. Our current understanding is that Creative
Scotland would not automatically remove the funding as it is based on delivery of
agreed outputs and outcomes rather than the legal entity that delivers. However,
this does remain a risk for the future.
• The migration of existing systems across the three ALEOs into a single structure
has the virtue of aligning activity to existing Council systems, but could also be
complex (and potentially disruptive and costly) given that each ALEO operates
different systems for finance and IT.  
• In relation to IT in particular, the costs of licences are considerably higher for PKC
than for the ALEOs as a result of their charitable status. This is likely to add
significant cost as well as time to support a migration to new systems.
• It could be argued that full control by the Council might make property
rationalisation more straightforward, but it is not clear that this is the case as the
council already has decision making authority on any closures. 
• While key staff could be retained (via TUPE transfer to PKC) bringing all services
into the Council would lose the expertise on each of the ALEO Boards. 
4.3 Option 2: Some Services In House
Option 2 would involve the Council taking some services back in house – including
corporate support services such as finance, IT and HR (it already retains property
management except for the venues that are owned by LAL) and libraries. The rationale for
this is twofold:
• Libraries are community services that may be better aligned with other community
focussed provision within the Council.

Page 44

41 
PKC - GENERAL
• The consolidation of corporate services offers opportunities for rationalisation via
economies of scale. 
While this option would be less disruptive and less complex than a full transfer of all
services into PKC, it does raise some of the same issues as Option 1 regarding the
consolidation of corporate services and systems. It would also require that terms and
conditions be equalised for affected staff.
4.4 Option 3: One/ Two ALEOs
This option breaks down into two ‘sub-options’ as explained below. 
4.4.1 Option 3a: One ALEO
Under Option 3a, the three existing ALEOs would be merged into a single new
organisation also with ALEO status. There is a risk here that, following the Barclay Review
of Non-Domestic Rates in 2017, a new ALEO would not be eligible for rates relief.
However, as the assets in question are already under ALEO management this may be
something of a grey area and would require specialist advice. For now, we have assumed
that the new body would benefit from rates relief. 
Other issues to be considered include:
• The merger of the three organisations would require equalisation of staff terms
and conditions, increasing the total staff costs (but reducing the risk of equal pay
claims). 
• Economies of scale should be possible via streamlining of corporate services and
workforce planning. While in theory senior management positions could be
rationalised, each service area will still require the appropriate expertise at senior
level, plus the new organisation would need an overall CEO.  Some rationalisation
may be possible in corporate functions such as finance, HR and business
development. 
• ALEO status should enable a new organisation to access funding sources not
available to local authorities.  
• Strong income generating services (e.g. health and fitness) could help cross-
subsidise those that generate less income (e.g. libraries, museum).

Page 45

42 
PKC - GENERAL
• The three ALEOs are each operating quite different businesses and business
models, and the strategic coherence of a single merged organisation is not always
clear, although there are precedents from elsewhere.  
4.4.2   Option 3b: Two ALEOs
With Option 3b, two different models are possible, as follows:
• Merger of CPK and PTCH to create a new Cultural ALEO, with LAL remaining as it
is.
• Merger of LAL and CPK with PTCH remaining as it is.  
The first has a degree of strategic rationale as both are cultural ALEOs and the museum,
art gallery, theatre and concert hall are all key assets serving both the communities of
Perth and Kinross and the wider visitor market. The rationale to bring together the
museum, art gallery and libraries with leisure services is arguably less clear although as
noted above, libraries and leisure services both have a very strong community focus (the
other services do too but also have a role in driving the visitor economy of the region). 
In the appraisal, we have focussed more on the second of the two models above on the
basis that LAL and CPK are more closely aligned in relation to staff terms and conditions.
The assumption is that corporate services (finance, HR, IT etc) would be provided by the
new ALEO on behalf both of itself and PTCH.  
However, this model still raises some issues:
• There is again an issue with different staff terms and conditions, albeit pensions are
aligned.
• There may also be an issue with the extent to which trusts and foundations which
already support more than one of the ALEOs (e.g. Gannochy Trust) would continue
to support at the same level if organisations were merged. 
• Under this model, there could be scope for some economies of scale in corporate
support services and staffing but these would be smaller than in a larger merged
organisation.
• CPK and LAL have different support needs in areas like finance and HR (LAL
operates out of hours, for example) and they use different systems – the same is
also true for PTCH.

Page 46

43 
PKC - GENERAL
• There is less strategic coherence in this option than in a merger of CPK and PTCH. 
4.5 Option 4: Culture and Sport ALEO and
change in status for PTCH
Option 4 brings together CPK and LAL and proposes a change in status for PTCH such
that it becomes an independent charity rather than a Council-owned ALEO. This is similar,
for example, to the status of the Royal Lyceum Theatre in Edinburgh which is an
independent charity operating a council-owned building (and in receipt of funding
support from the local authority).  
This option aligns PTCH more with other producing theatres in Scotland (none are ALEOs)
and opens up the possibility of funding from some trusts that do not typically support
ALEOs (the Robertson Trust would be one important example).  
The creation of a culture and sport ALEO, as discussed above, has some precedent across
Scotland (Glasgow, Highland and Dundee all have culture and sport ALEOs) and should
offer some potential for economies of scale in staffing and corporate services functions.
However, issues with differing staff terms and conditions are still present, and LAL and
CPK operate different systems for financial management and bookings. 
It is possible too that bringing leisure assets, community halls and libraries all under a
single delivery structure could open up further opportunities for the development of
consolidated community facilities (some of which have already been considered), which is
consistent with the direction of travel for PKC and indeed for councils across Scotland.

Page 47

44 
PKC - GENERAL
5 Appraisal
5.1 Introduction
While the appraisal is designed, to some extent, to test the potential to achieve financial
efficiencies through the different structural options, it is important that a broader
approach is taken that considers other less easily quantified factors. With this in mind, the
appraisal has been conducted in two stages:
• Each of the options was set out in an organogram format and a financial model
created for each. This took account of costs and income (as provided by each of
the ALEOs) and identified potential savings that might be realised through staff
and other operational efficiencies. A supplementary note providing more detail is
included at Appendix A. 
• Each option was then assessed against a set of wider criteria by awarding each a
score between 1 and 10 (with 10 being most positive).   
5.2 Financial Appraisal
This section considers the financial impact of the options being considered and is based
on information available at the time of writing. Therefore, all figures detailed should be
taken as indicative rather than definitive.
For the purposes of the analysis, we have split Option 2 into Option 2a: Bring corporate
services in-house and Option 2b: Bring corporate services and Library services in-house.
Similarly, for Option 3 we have set out Option 3a: Create a single new ALEO and Option
3b: Create two new ALEOs. As such, six options have been appraised:
• Option 1: Bring all ALEOs in house to PKC.
• Option 2a: ALEO Corporate Services delivered by PKC and ALEOs retain own
identity 
• Option 2b: ALEO Corporate Services delivered by PKC and Library services
brought back into PKC.
• Option 3a: Create one new ALEO, bringing together all three ALEOs into a single
organisation.

Page 48

45 
PKC - GENERAL
• Option 3b: Two ALEOs – one bringing together LAL and CPK with PTCH
remaining as it is. 
• Option 4: Create one ALEO for culture and sport and considering possible
change of status for Perth Theatre and Concert Hall.
In terms of potential savings/additional costs, we have based this against the current level
of investment made by PKC in terms of management fee currently being paid. 
The assumptions and calculations used to estimate savings are set out below and cover: 
• Senior Management realignment 
• Alignment of Terms and Conditions
• Non-domestic rates
• Governance costs
Senior Management Realignment
The savings under each option achieved by senior management realignment are detailed
below. 
Terms and Conditions
For all of the options we have assumed that affected staff would be brought in line with
PKC terms and conditions as follows:
• Option 1: all ALEO staff TUPE into PKC with Ts and Cs aligned to PKC
• Option 2a: ALEO Corporate Services staff TUPE into PKC with Ts and Cs aligned
to PKC
• Option 2b: ALEO Corporate Services staff and CPK Library staff TUPE into PKC
with Ts and Cs aligned to PKC
• Option 3a: All ALEO staff aligned to PKC Ts and Cs
• Option 3b: Ts and Cs for LAL and CPK staff aligned to PKC (in line with CPK) and
PTCH remains unchanged
• Option 4: Ts and Cs for LAL and CPK staff aligned to PKC (in line with CPK) and
PTCH remains unchanged.   
For these purposes we have made an assumption of uplifting relevant salaries (and
pensions) from LAL and PTCH by 8% which is the current difference between LAL and

Page 49

46 
PKC - GENERAL
CPK salaries. Where positions have been identified as not being required, we have
calculated potential savings based on current salary being paid by the relevant
organisation.
Non-domestic rates
The figures here are the assumed loss of NDR savings that are currently being achieved
by the ALEO’s. In Option 1 as the proposal is that all ALEO’s be brought in-house, we
have assumed that all NDR savings would be lost. The level of savings has been based on
information obtained via the assessor's office and where that information was not readily
available (libraries and town halls) we have assumed costs based on similar sized venues.
In Option 2b the NDR for library properties would be lost. 
None of the other options have implications for NDR as assets remain under charitable
management. 
Governance Costs
Governance costs savings have been based on current costs incurred by each
organisation in relation to accountancy and audit fees, legal and professional fees and
irrecoverable VAT. Assumptions are as follows:
• Option 1: all governance costs saved – governance within PKC
• Option 2a: no governance savings
• Option 2b: no governance savings
• Option 3a: savings on the basis of consolidated requirement (based on loss of
current CPK and PTCH Costs)
• Option 3b: some savings based on loss of CPK costs
• Option 4: some savings based on loss of CPK costs

Page 50

47 
PKC - GENERAL
5.2.1 Current Model (Baseline Position)
Currently the combined Senior Management structures are as set out in Table 5.1 (below)
and Figure 5.1 (over) and cost £840,491 per annum.
Table 5.1: Senior Management Structure (current)
Live Active Leisure  Culture Perth &
Kinross 
Perth Theatre and Concert
Hall
Position FTE Position  FTE Position  FTE
Chief Executive Officer 1 Chief Executive 1 Director 1
Head of Business
Development
1 Head of
Audiences and
Learning
1 Director of External
Relations (0.8)
0.8
Head of Support
Services
1 Head of Museums
and Collections
1 Director of Commercial
Operations
1
Head of Finance 1 Head of
Operations and
Support Services
1 Director of Finance and
HR (0.8)
0.8
Head of Operational
Services
1 Senior Finance
Officer
1 Finance Manager 1
Total 5  5  4.6

Page 51

48 
PKC - GENERAL
Figure 1: Current Senior Management Structures – all three ALEOs 
CEO LAL
Head of Business
Development
Head of Corporate
Support Services Head of Finance
Head of
Operational
Services
CE CPK
Senior Finance
Officer
Head of
Audiences &
Engagement
Head of
Community
Support Services
Head of Museums
and Collections
Director PTCH
Director of
External Relations
Director of
Commercial
Operations
Director of
Finance & HR
Finance Manager

Page 52

49 
PKC - GENERAL
5.2.2 Option 1: Bring all current ALEOs in house to PKC
This would see the disbandment of the current three ALEOs and the staff and services
being merged into a relevant Council department. Table 5.1 below summarises the
financial impact of this option. In assessing this option, we have made the following
assumption:
• There would be a reduction in Senior Management positions through some form
of redundancy process.
• Staff terms and conditions would be brought in line with those of PKC. We have
assumed an 8% increase for this purpose, as noted above.
• Current levels of income generation would be maintained including donations and
grant funding, although it should be noted that an in-house model would put
some funding at risk. As a result, the cost to PKC for this option could be higher
than shown below.
The level of staff savings is based on the assumption that the current number of Senior
Positions within the ALEOs would not be required therefore generating potential savings.
The assumption is that a combined Senior structure would be created that would oversee
the running of the services that are currently provided by the 3 ALEOs – Table 5.2. 
Table 5.2: Option 1 Senior Management Structure (within PKC)
Proposed Combined Structure 
Position FTE
Senior Service Manager 1
Lead Manager of Ops & Service Delivery 1
Lead Manager of Business Dev & Partnerships 1
Lead Manager of Finance & Corporate Services 1
Lead Manager of Programmes & Service Development 1
Total 5
The revised Senior Management Structure for the services if brought within PKC is
illustrated in Figure 5.2, over. We have assumed that the tier below would include service
specific expertise.

Page 53

50 
PKC - GENERAL
Figure 5.2: Option 1 - Revised Senior Management Structures (within PKC) 
Senior Service
Manager
Lead Manager of
Ops & Service
Delivery
Lead Manager of
Business Dev &
Partnerships
Lead Manager of
Finance &
Corporate Services
Lead Manager of
Programs & Service
Development

Page 54

51 
PKC - GENERAL
One-off costs for implementation (including redundancy costs, increased software licence
costs and any system integration costs) would be over and above the figures shown.
Table 5.3: Option 1 – In House Delivery
Category of Expenditure Savings/ Costs
Senior Management re-alignment -£481,774
Terms & Conditions consolidation £750,442
Governance Costs -£400,257
Non Domestic Rates £2,735,300
Annual Additional Cost/Saving to PKC £2,608,711 
As shown, this option would bring significant additional costs to PKC mainly as a result of
the loss of the current non domestic rates relief. Alignment of staff terms and conditions
also adds considerable cost.  
5.2.3 Option 2a: Bring Corporate Services in house to PKC
This option looks at the feasibility of taking away the current corporate services function of
each ALEO and having them delivered by PKC under a services agreement. 
This appraisal assumes that all corporate services would be provided by PKC and that any
relevant staff would be TUPE transferred from the ALEOs to PKC. The potential savings
under Senior Management re-alignment works on the basis that some of the current
Senior positions would not be required as equivalents would already be in place at PKC.
Table 5.4 summarises the positions identified as being surplus and therefore generating
the potential saving. The revised Senior Management Structures within the ALEOs are
summarised in Figure 5.3, over. 
Table 5.4: Option 2a – Surplus Management Positions
Live Active Leisure  Culture Perth &
Kinross 
Perth Theatre and Concert
Hall
Position FTE Position  FTE Position  FTE
Head of Finance 1 Senior Finance
Officer
1 Director of Finance & HR
(0.8)
0.8    
Finance Manager 1
Total 1  1  1.8

Page 55

52 
PKC - GENERAL
Figure 5.3: Option 2a - Senior Management Structures in all three ALEOs 
CEO LAL
Head of
Business
Development
Head of
Corporate
Support Services
Head of
Operational
Services
CE CPK
Head of
Audiences &
Engagement
Head of
Community
Support Services
Head of
Museums and
Collections
Director PTCH
Director of
External
Relations
Director of
Commercial
Operations

Page 56

53 
PKC - GENERAL
The financial assessment is summarised in Table 5.5 below. The modelling assumes that
terms and conditions for the staff that are transferred to PKC are then aligned to PKC.
Other costs and income remain as current estimates. It does not include potential hidden
cost including redundancy costs, software licences and system integration. 
Table 5.5: Option 2a – Corporate Services In House
Category of Expenditure Savings/ Costs
Senior Management re-alignment -£206,349
Terms & Conditions consolidation £14,542
Governance Costs £0
Annual Additional Cost/Saving to PKC -£191,807
As shown above, this option has the potential to achieve a modest saving. However, it
should be noted that currently there is no standard approach to systems and processes
across the ALEOs in terms of software and each operating model has its own specific
requirements which may be hard to replicate in a single support service from PKC. It was
also reported that CPK was previously asked to move away from PKC finance support as
they were unable to meet day to day operating needs, 
5.2.4 Option 2b: Bring Corporate Services and Library Services in
house to PKC
This option considers the transfer of Library Services into PKC alongside a central
corporate services function. 
This appraisal assumes that all corporate and library services are brought in-house to PKC
and that any relevant staff would be TUPE transferred back to PKC (with terms and
conditions aligned to PKC – see below). The potential savings under Senior Management
re-alignment works on the basis that some of the current Senior positions would not be
required as equivalents would already be in place at PKC. Table 5.6, over, summarises
the positions identified as being surplus and therefore generating the potential saving. 
NB: The assumption gives the same level of management savings as 2a as the specialist
Senior Library positions would still be required to deliver the service.

Page 57

54 
PKC - GENERAL
Table 5.6: Option 2b – Surplus Management Positions
Live Active Leisure  Culture Perth &
Kinross 
Perth Theatre and Concert
Hall
Position FTE Position  FTE Position  FTE
Head of Finance 1 Senior Finance
Officer
1 Director of Finance & HR
(0.8)
0.8    
Finance Manager 1
Total 1  1  1.8
The revised management structures within the ALEOs are summarised in Figure 5.4,
over.

Page 58

55 
PKC - GENERAL
Figure 5.4: Option 2b - Senior Management Structures in all three ALEOs 
CEO LAL
Head of
Business
Development
Head of
Corporate
Support Services
Head of
Operational
Services
CE CPK
Head of
Audiences &
Engagement
Head of
Community
Support Services
Head of
Museums and
Collections
Director PTCH
Director of
External
Relations
Director of
Commercial
Operations

Page 59

56 
PKC - GENERAL
The financial impact is summarised in Table 5.7 below. 
Table 5.7: Option 2b – Corporate Services and Libraries In House
Category of Expenditure Savings/ Costs
Senior Management re-alignment -£260,349
Terms & Conditions consolidation £14,542
Governance Costs £0
Non Domestic Rates £606,800
Annual Additional Cost/Saving to PKC £414,993
This option could mean a significant additional cost to PKC driven by the loss of non-
domestic rates savings across the library estate. As with Option 2a, there would also be
the challenge (and hidden costs) of bringing together the various approaches to systems
and processes across the ALEOs. 
5.2.5 Option 3a: Create a single new ALEO
This option looks at creating a new body to run all cultural, library and sports and leisure
services on behalf of PKC. 
Similar to Option 1, this assumes that a merger of the 3 ALEOs into one would only
require a single Senior Management Team to operate. Table 5.8 summarises the
proposed Senior Management Team for a new organisation. This is illustrated in Figure
5.5, over.
Table 5.8: Option 3a – Proposed Management Structure
Proposed Combined Structure 
Position FTE
Chief Executive Officer 1
Executive Director of Ops & Service Delivery 1
Director of Business Dev & Partnerships 1
Director of Finance & Corporate Services 1
Director of Programmes & Service Development 1
Director of Ops & Service Delivery 1
Total 6

Page 60

57 
PKC - GENERAL
Figure 5.5: Option 3a - Senior Management Structure for single ALEO 
Chief Executive
Officer
Director of Business
Development &
Partnerships
Director of Finance
& Corporate
Services
Director of
Programs & Service
Development
Director of
Operations &
Service Delivery
Executive Director
Operations &
Service Delivery

Page 61

58 
PKC - GENERAL
The financial impacts of this option are summarised in Table 5.9 below. 
Table 5.9: Option 3a – Single new ALEO
Category of Expenditure Savings/ Costs
Senior Management re-alignment -£284,768
Terms & Conditions consolidation £747,186
Governance Costs -£193,999
Non Domestic Rates £0
Annual Additional Cost/Saving to PKC £268,419 
Again, this option represents an additional financial burden to PKC mainly due to the
assumption that Terms & Conditions of employment would require to be standardised. As
with the other options considered, there is no allowance for one-off costs of
implementation to achieve this. Consideration would also have to be given to the
complexity of bringing together three diverse organisations into one and the cultural
challenges that this would represent.
5.2.6 Option 3b: Two ALEOs
This option proposes a shift from the current three ALEOs to two bodies. This assessment
has assumed that one body would be the merger of LAL and CPK due to them being
more closely aligned in terms of T&C’s. The second body would leave PTCH as it currently
operates. 
This option looks at the merging of LAL and CPK into a new entity and the retaining of
PTAH but in a more streamlined manner with corporate services being provided by the
larger entity.
Table 5.10, over, summarises the proposed Senior Management Structures for the 2
entities.

Page 62

59 
PKC - GENERAL
Table 5.10: Option 3b Senior Management Structures
New ALEO  Perth Theatre and Concert Hall
Position FTE Position  FTE
Chief Executive Officer 1 Director 1
Head of Business Development 1 Director of External Relations (0.8) 0.8
Head of Support Services 1 Director of Commercial Operations 1
Head of Finance 1  
Head of Operational Services 1  
Head of Audiences & Learning 1  
Head of Heritage & Culture 1  
Total 7  2.8
The new structure is illustrated in Figure 5.6, over.

Page 63

60 
PKC - GENERAL
Figure 5.6: Option 3b - Senior Management Structure for two ALEOs 
CEO
Head of
Business
Development
Head of  Support
Services Head of Finance
Head of
Operational
Services
Head of
Audiences &
Learning
Head of Heritage
& Culture
Director PTCH
Director of
External
Relations
Director of
Commercial
Operations

Page 64

61 
PKC - GENERAL
The financial impact is summarised in Table 5.11 below.
Table 5.11: Option 3b – Two ALEOs
Category of Expenditure Savings/ Costs
Senior Management re-alignment -£284,768
Terms & Conditions consolidation £747,181
Governance Costs -£52,525
Non Domestic Rates £0
Annual Additional Cost/Saving to PKC £371,100
Again, consideration needs to be given to the additional one-off costs that would be
required for this option to be delivered. In addition, the forecast shows a significant
additional financial burden to PKC, again driven by the alignment of terms and conditions. 
5.2.7 Option 4: New Sport and Culture ALEO and change of status for
PTCH
This option would mean that the Council would have a single ALEO representing Sport,
Culture, Libraries and Museums and re-imagine the current operating model of PTCH to
no longer be an ALEO but an alternative type of supported body (we have assumed that
this would be an independent charity). In this option, PTHC terms and conditions would
remain as they are. 
Table 5.12 below summarises the proposed Senior structures. Figure 5.7, over, displays
the structure as an organogram. 
Table 8: Option 4 Senior Management Structures
New ALEO  Perth Theatre and Concert Hall
Position FTE Position  FTE
Chief Executive Officer 1 Director 1
Head of Business Development 1 Director of External Relations (0.8) 0.8
Head of Support Services 1 Director of Commercial Operations 1
Head of Finance 1 Director of Finance & HR 0.8
Head of Operational Services 1 Finance Manager 1
Head of Audiences & Learning 1  
Head of Heritage &Culture 1  
Total 7  4.6

Page 65

62 
PKC - GENERAL
Figure 5.7: Option 4 Senior Management Structures 
CEO
Head of
Business
Development
Head of  Support
Services Head of Finance
Head of
Operational
Services
Head of
Audiences &
Learning
Head of Heritage
& Culture
Director PTCH
Director of
External
Relations
Director of
Commercial
Operations
Director of
Finance & HR
Finance Manager

Page 66

63 
PKC - GENERAL
The financial analysis is summarised in Table 5.13 below.
Table 5.13: Option 4 – Culture and Sport ALEO and PTCH change
Category of Expenditure Savings/ Costs
Senior Management re-alignment -£220,169
Terms & Conditions consolidation £560,450
Governance Costs -£52,525
Non Domestic Rates £0
Annual Additional Cost/Saving to PKC £287,756
As can be seen the option again places an additional recurring burden on PKC. This is
mainly due to increased staffing costs as it assumes that the new ALEO would be brought
in line with PKC terms and conditions.
5.2.8 Conclusions & further cost implications
The above assessment shows there is only one option that potentially brings a financial
saving on a recurring basis, Option 2a consolidation of corporate services. However, it
should be noted that there could be significant challenges and costs in delivering this due
to current set ups and requirements. 
Table 5.14 below summarises the financial impact of all of the options. 
• Option 1: Bring all ALEOs in house to PKC.
• Option 2a: Bring some ALEO services in house (e.g. consolidation of corporate
services from ALEOs delivered by PKC) 
• Option 2b: as 2a but with library services brought back into PKC.
• Option 3a: Create one new ALEO 
• Option 3b: two new ALEOs – streamlining corporate and back-office services.
• Option 4: Create one ALEO for culture and sport and consider possible change of
status for Perth Theatre and Concert Hall.

Page 67

64 
PKC - GENERAL
Table 5.14: Summary of Financial Appraisal
Category of
Expenditure
Option 1 Option 2a Option 2b Option 3a Option 3b Option 4
Senior Management
re-alignment
-£481,774 -£206,349 -£206,349 -£284,768 -£323,561 -£220,169
T&C’s alignment £750,442 £14,542 £14,542 £747,186 £747,786 £560,450
Non-Domestic Rates £2,735,300  £606,800   
Governance Costs -£400,257   -£193,999 -£52,525 -£52,525
Costs/Savings £2,603,711 -£191,807 £414,993 £268,419 £371,100 £287,756 
In addition to the costs that have been highlighted above, there are a number of one off
(and some recurring) implementation costs for each option that would need to be
considered. In some cases, additional costs would require significant investment and may
have an impact on the costings above, especially in relation to the savings currently
attached to Option 2a. While precise costings have not been prepared for all of these
additional costs due to the variation across options and the complexity of costs in areas
like IT and systems, a breakdown of the types of areas under consideration has been
provided below: 
• IT Systems: rationalisation and integration to unified systems across all
organisations.  At present, there are approx. 50 systems in use across ALEO’s for
HR, payroll, budgeting, ticketing, licencing, technical support and customer
service areas. Some of these systems are specific to the organisation and would
need to be kept as there is no PKC equivalent. Costs for recurring contracts and
one off costs are around £420k per annum across all three ALEO’s.  Further work
could be carried out as a separate project if required to analyse full costs of
integration, systems remaining as well as the time and resources required to
deliver on this.  
• Loss of charity status discount: through consolidation of services to PKC, there
could be resulting reductions to discounts for contracts and services which are
both recurring and one off. Costs have not been identified in detail due to the
variable nature. 
• Additional costs for integrated systems: PKC may incur additional costs (one off
and recurring) to consolidate and increase users / capacity of Finance / HR / Payroll
systems. There may also be some implications in terms of flexibility, for example
payroll as PTACH pay sessional / weekly / hourly employees and PKC pay on a

Page 68

65 
PKC - GENERAL
regular monthly basis.  This may also incur additional add on functions to PKC
payroll systems.
• Voluntary Retirement / Redundancy: in the event of staff being displaced as a
result of structural change, there would be additional one off costs for those
entitled to redundancy payments. 
• Implementation resources: to ensure any of the options above was implemented
in the most timely, efficient and cost effective way possible, project management
support would be required as a one off cost. 
5.3 SWOT Analyses
In addition to the financial appraisal, a summary of the Strengths, Weaknesses,
Opportunities and Threats (SWOT) of each option is provided below. These were
discussed at a workshop with the ALEO Review Working Group in August 2025. 
5.3.1   Option 1: Bring all current ALEOs in house to PKC
In addition to potential savings in senior management costs, Option 1 offers the potential
to consolidate service and structures and provides clear lines of accountability through
existing Council governance arrangements. However, there are considerable costs in this
model due to the loss of NDR relief and a shift to in house delivery could have
implications for existing sources of funding to the ALEOs both from public funders (e.g.
Creative Scotland) and trust and foundations. 
While there may be opportunities for further efficiencies through workforce planning and
asset rationalisation the added costs are likely to lead to further cuts with service
reductions likely.

Page 69

66 
PKC - GENERAL 
5.3.2 Option 2a: Bring Corporate Services in house to PKC
Option 2a delivers some staff savings and consolidates support services within the
Council. However, these saving are modest and, as noted likely outweighed by the costs
of change. All of the ALEOs also raised issues with the extent to which the Council would
be able to meet their specific needs in areas like HR/ payroll, finance and IT. This in turn
could negatively impact on relationship between the Council and the ALEOs.   
Weaknesses:
Cost to Council (NDR and Ts & Cs)
Reduced funding opportunities
Potential risks to current funding
Dilution of brand value
Questions over Council expertise
Loss of service specific expertise
Hidden costs for winding up ALEOs
Strengths:
Consolidation of support services
Senior Management savings
Accountability
Alignment to Council services
Threats:
Reduced focus on services within larger
structures
Financial issues require deeper service
cuts
Ongoing Council budget pressures
Opportunities:
Further savings through workforce
planning Asset rationalisation
Closer links to related Council services
Greater political engagement/
understanding
Weaknesses:
Savings are only modest
Hidden costs (eg IT alignment, HR)
Possible issues with inconsistent support to
ALEOs
Strengths:
Delivers some staff savings
Consistency of systems and support
services within PKC
Retains ALEO identities/ brands
Threats:
ALEOs demanding higher level of service
that Council able to provide
Possible negative impact on Council/
ALEO relationships
Negative impact on ALEO operations?
Opportunities:
Allows ALEOs to pursue income
generation plans

Page 70

67 
PKC - GENERAL
5.3.3 Option 2b: Bring Corporate Services and Library Services in
house to PKC
Option 2b also delivers some staff savings and aligns support systems within PKC while
enabling the ALOEs to continue to operate under their own brands. However, as with 2a,
the savings are modest and could easily be outweighed by the costs. The loss of the NDR
relief on libraries also makes this option less affordable.   
5.3.4 Option 3a: Create a single new ALEO
Option 3a again delivers some staff savings and the potential for more in future with
efficient workforce planning. However, the more consolidated model reduced the extent
of service specific expertise on both the senior management team and the Board. As
noted in the financial appraisal, the main area of cost here is in aligning staff terms and
conditions (to those of CPK/ PKC).  
This option should also afford opportunities for both collaboration and across selling
across service areas as well as cross-subsidy. 
Weaknesses:
Staff savings are only modest
Hidden costs (eg IT alignment, HR)
Loss of libraries NDR savings
Strengths:
Delivers some (modest) staff savings
Consistency of systems and support
services
Retains ALEO identities/ brands
Aligns libraries to Council services
Threats:
ALEOs demanding higher level of service
that Council able to provide
Possible negative impact on Council/
ALEO relationships
Opportunities:
Allows ALEOs to pursue income
generation plans

Page 71

68 
PKC - GENERAL 
5.3.5 Option 3b: Two ALEOs
Similar to Option 3a, Option 3b delivers staff savings (albeit at a lower level) and the
opportunity for more in future. However it is also subject to the hidden costs of change
and the costs associated with the alignment of terms and conditions.  There is also the
question of the strategic coherence of bring together sport and leisure with museums and
libraries and again the loss of service specific expertise that could result.   
Weaknesses:
Cost of alignment of Ts and Cs
Hidden costs (eg IT alignment, HR)
Loss of service specific expertise/ focus at
senior management and Board level
Dilutes individual ALEO brands
Strengths:
Delivers some staff savings
Consistency of systems and support
services
Allows cross-subsidy of services
Allows greater service collaboration across
service areas
Threats:
Long term sustainability not clear
Potential loss of funding
Opportunities:
Possibility to realise other economies of
scale
Allows new ALEO to pursue income
generation plans
Collaboration/ cross-selling across service
areas
Weaknesses:
Cost of alignment of Ts and Cs
Hidden costs (eg IT alignment, HR)
Loss of service specific expertise/ focus at
senior management and Board level (LAL/
CPK)
Dilutes individual ALEO brands (not PTCH)
Lack of strategic coherence between LAL
and CPK services
Strengths:
Delivers some staff savings
Consistency of systems and support
services
Allows cross-subsidy of services (LAL and
CPK)
Allows greater service collaboration
between LAL and CPK
Threats:
Long term sustainability not clear
Potential loss of funding
Opportunities:
Possibility to realise other economies of
scale
Allows new ALEO and PTCH to pursue
income generation plans
Collaboration/ cross-selling across service
areas

Page 72

69 
PKC - GENERAL
5.3.6 Option 4: New Sport and Culture ALEO and change of status for
PTCH
Option 4 is broadly similar to Option 3b but offers the added benefit to PKC of removing
the risk of equal pay claims relating to PTCH (it being independent in this model).
However, the Council should note that this independence could result in less direct
accountability. While independent status can open up some additional funding
opportunities (some trusts are reluctant to support ALEOs), encourage public trust and
donations and would bring PTCH more in line with the wider theatre sector, it is not
without risk to the organisation. ALEO status is generally held to offer greater certainty for
the ALEO regarding council support (although this is not guaranteed) and for councils it
offers clearer accountability and alignment to council priorities. 
5.4 Wider Appraisal
As outlined above, the financial appraisal suggests that Option 2a is the most likely to
deliver financial savings, albeit at a relatively modest level.  However, as discussed,
financial savings, important as they are, should not be the only criteria on which decisions
are made. Here, we appraise each of the options against a wider set of criteria:
Weaknesses:
Cost of alignment of Ts and Cs
Hidden costs (eg IT alignment, HR)
Loss of service specific expertise/ focus at
senior management and Board level (LAL/
CPK)
Dilutes individual ALEO brands (not PTCH)
Reduced Council control/ accountability
(PTCH)
Strengths:
Delivers some staff savings
Consistency of systems and support
services
Allows cross-subsidy of services (LAL and
CPK)
Allows greater service collaboration
between LAL and CPK
Removes equal pay risk for PKC
Threats:
Long term sustainability not clear
Equal Pay issue within PTCH
Longer term funding risk to PTCH?
PKC need to tender for PTCH services?
Opportunities:
Possibility to realise other economies of
scale
Allows new ALEO and PTCH to pursue
income generation plans
New funding opportunities for PTCH
Collaboration/ cross-selling across service
areas

Page 73

70 
PKC - GENERAL
• Income generation – the financial appraisal above focussed mainly on cost
savings, but the different options have implications for income generation in
particular through access to funding sources (weighted x1.5).
• Management focus – considering the extent to which the different models enable
or inhibit sufficient management (and Board) focus on the different service areas.
• Service development – the extent to which the options support the development
of exiting and/ or new services.
• Impact on staff – considering the degree to which each option will have an impact
on staff across the three ALEOs.
• Impact on service continuity – whether or not each option is likely to impact the
continuity of service delivery. 
• Set up costs – considering the potential costs of moving to each option (not
quantified but scored against each other).
• Credibility and influence – the extent to which the options result in a structure
with credibility and influence within and beyond Perth and Kinross.
• Sustainability – assessing the extent to which each option offers a sustainable
model for service delivery (this is weighted x2 to reflect its importance).
• Risk – assessing the level of potential risk associated with each option (weighted
x1.5). 
Each member of the study team scored the options from 1 to 10 (where 1 is negative and
10 positive) independently and the results were compared and combined to arrive at an
overall assessment, summarised in Table 5.15, over.

Page 74

71 
PKC - GENERAL
Table 5.15: Summary of Qualitative Scoring
Criteria
Option 1 Option
2a
Option
2b
Option
3a
Option
3b Option 4
In House Shared
Services 
Shared
Services
&
Libraries
in house
One
ALEO –
Culture
and
Leisure
Two
ALEOs
PTCH
status/
One
ALEO
Income
generation
7.5 10.5 10.5 12 10.5 10.5
Management
focus on service
6 8 8 6 7 7
Service
development
5 6 6 7 7 8
Impact on staff 4 7 6 5 5 6
Impact on service
continuity
5 7 7 6 6 7
Set up costs 7 8 8 6 6 6
Time to deliver 5 7 6 5 6 6
Credibility and
influence 
6 7 7 8 7 7
Sustainability 14 16 16 14 12 12
Risk 9 9 9 10.5 10.5 10.5
Total Score 68.5 85.5 83.5 79.5 77 80 
The rationale for the scoring is as follows:
• Income generation – options which create new consolidated ALEOs offer strong
income generation opportunities but also the risk that some trusts and other
funders’ income may reduce if they choose to fund only once to the new body/
bodies, compared to the shared services model where the individual ALEOs
continue to operate. Council-run services would not have access to the range of
funding sources available to ALEOs and charities.

Page 75

72 
PKC - GENERAL
• Management focus – options which consolidate services under a single
management structure lead inevitably to rationalisation of management teams and
Boards (with cost savings as considered above) and therefore to a dilution of
service specific focus and expertise compared to options which maintain the three
organisation structures.   
• Service development – the more consolidated models were judged to offer
slightly greater potential for service development through opportunities for
income generation, collaborative effort and cross-subsidy.  Council delivery scored
lower here due to the financial impact of the loss of non-domestic rates relief,
which would constrain service development. 
• Impact on staff – options that result in significant structural changes are likely to
be disruptive for staff and those that are based on consolidation could also result
in headcount reductions. These options therefore scored lower. 
• Impact on service continuity – similarly, options which propose high levels of
restructure carry a higher risk of services being disrupted through the change
process. 
• Set up costs – greater levels of structural change are likely to incur more in the way
of set up costs, including legal and related costs as well as costs relating to
potential staff restructure.  
• Credibility and influence – experience from further afield suggests that larger
organisations often carry more weight and influence. However, in this case PTCH
may be better served by having its own identity, particularly in relation to the
theatre production sector and audience. Delivery from within the council was felt
to result in a lower level of influence based on concerns that the services could
have a lower profile alongside much larger statutory provision.  
• Sustainability – the financial appraisal demonstrates the potential of most options
to deliver significant savings is limited. Therefore, none can be assessed as offering
strong potential for a sustainable model other than the shared services model
which is itself modest.  
• Risk – the appraisal found little to separate the options in terms of risk as all raise
issues in some form from funding risks in consolidated models to financial risks.
The single ALEO model was judged least risky on the basis that it protects rates
relief and other ALEO benefits while offering the potential for longer term
economies of scale and service development.

Page 76

73 
PKC - GENERAL
On the basis of this scoring, the shared services model emerges as the strongest option,
albeit largely as a result of the fact that it avoids the risks and issues associated with
significant structural change while delivering some modest financial benefit. 
5.5 Preferred Option
The importance of the financial context, and the need to identify a sustainable model for
the delivery of culture and leisure services in Perth and Kinross point towards the shared
services model (Option 2a) as the most promising. However, as noted earlier, this is not
without complication given the different requirements of each of the three ALEOs, the
differences in terms and conditions for affected staff and the concerns raised by all three
in relation to whether or not a single service would be sufficiently flexible and responsive
to meet their needs.  
The status quo position is not sustainable, at least not on its current trajectory, but there
are some mitigating factors that should be considered.  
• PTCH is working to a plan to further increase its income through growth in
commercial activity, increased ticket sales with more production activity and a
focus on fundraising particularly with trusts and foundations. Progress has been
made and it is likely that this could result in a more financially robust position
within a few years. 
• The planned PH2O facility will replace the Bell’s Centre and the existing leisure
pool and will enable LAL to move to a more sustainable platform through
increased income and cost reduction at these other sites (there may also be an
opportunity for an alternative delivery model for the Dewars’ Ice facility). 
It is also important to consider the return on PKC’s investment in terms of the value and
impact that culture and leisure can create for Perth and the wider region. Linking back to
the Council’s priorities set out in the Corporate Plan, the three ALEOs can make a clear
contribution to priorities around physical and mental health and wellbeing, education and
in helping to mitigate the negative impacts of poverty and inequality. They can also,
through their combined asset base and service portfolio, make a significant contribution
to local economic development through area regeneration and the promotion of the
visitor economy. PTCH’s impact work demonstrates this potential and points towards the

Page 77

74 
PKC - GENERAL
potential gains of the three ALEOs working more closely together around this shared
agenda.    
5.6 PKC Objectives and Critical Success Factors
As set out in the study brief, PKC identified two objectives for the ALEO Review work,
along with seven critical success factors. 
5.6.1 PKC Objectives
PKC identified two main objectives for the ALEO Review work, as follows:
• Ensure a sustainable model of delivery for leisure and culture services in future.
• A more streamlined and consistent approach across all ALEO organisations in
terms of systems and corporate support.
Table 5.16, below, summarises the extent to which the identified options meet these
objectives. 
Table 5.16: PKC Objectives 
As shown, while the options generally do result in a more streamlined approach in terms
of systems and corporate support, the financial appraisal suggest that only Option 2a (and
possibly Option 4) offers the potential to develop a more sustainable model. However,
even for these options, this assessment remains uncertain.  
5.6.2 Critical Success Factors
Table 5.17, over, maps the options against the seven critical success factors (CFSs)
identified by PKC for the review work. 
Option 4Option 3bOption 3aOption 2bOption 2aOption 1PKC Objectives
MaybeNoNoNoMaybeNoSustainable Model
SomeSome (LAL
and CPK)
YesYesYesYesStreamlined and
consistent approach to
Corp Services

Page 78

75 
PKC - GENERAL
Table 5.17: Critical Success Factors 
Option 4Option 3bOption 3aOption 2bOption 2aOption 1CSFs
NoNoNoNoMaybe No1. Reduce costs / make
savings
NoNoNoNoNoNo2. Reduce ALEO
properties across Perth
& Kinross
MaybeNoNoNoNoNo3. Increased income
opportunities –
specifically in PTCH
Yes (PTCH
no longer
an ALEO)
YesYesNoNoYes4. Ensuring consistency
and equity in terms
and conditions of
employment in ALEO’s
PKC to
advise
PKC to
advise
PKC to
advise
PKC to
advise
PKC to
advise
PKC to
advise
5. Compliance with all
related employment
law across all ALEO's
Some (LAL
and CPK)
Some (LAL
and CPK)
YesYesYesYes6. Consolidation of
corporate services
NoNoNoNoMaybeNo7. Optimise PKC
investment in culture
and leisure through the
arms-length model

Page 79

76 
PKC - GENERAL
As shown, none of the options meets all of the CSFs. Most obviously, only Option 2a
delivers savings, but as noted above, these are likely cancelled out by the costs of aligning
systems.  None of the options makes it more or less likely that ALEO properties would be
reduced as this remains a decision for the Council and not one that is materially impacted
by the structural options. 
The only option that can clearly contribute to income generation is Option 4 by virtue of
the independent status of PTCH, and the resulting ability to access funding not available
to ALEOs or Councils.  This is not to say that income generation is not possible under the
other options – it is and all ALEOs have plans to do so – but rather that this is not
dependent on the structures proposed by the options.
Consistency in terns and conditions is a feature of Options 1, 3a, 3b and to some extent in
Option 4.  However, as noted, this comes at a considerable cost. All of the options do
result in greater consolidation of corporate services either within PKC or as part of a more
consolidated ALEO structure.  
In terms of the final CSF – optimising investment - the assessment remains unclear. As
noted, none of the options deliver significant savings so if the starting point is that the
current level of investment is not sustainable, then the proposed structural changes do
not offer a clear path to a more sustainable model.

Page 80

77 
PKC - GENERAL
6 Conclusions & Recommendations 
In this section, we present our overarching conclusion and discuss the implications of this
for PKC and the three ALEOs.
6.1 Appraisal Conclusions
The purpose of the study was to appraise the identified options for structural change in
the delivery of culture and leisure services in Perth and Kinross. The status quo, at least in
its current trajectory, is not considered sustainable as it is likely to demand a growing level
of subsidy from PKC.  
Examining each of the options in more detail reveals that the potential to achieve
significant savings is limited in virtually all options. The most promising is that of a shared
services model for corporate and back-office support functions but even this offers only
modest savings for a potentially significant level of operating risk. Indeed, the hidden
costs of aligning systems in areas like finance and IT is likely to offset the identified
savings. 
Thus, our overarching conclusion is that structural change (at least those identified in the
options) is unlikely to deliver the level of savings and efficiencies that will result in long
term sustainability.   
With that in mind, we have given some initial thought to what else might now be
considered and have proposed a twin track approach that combines a strategic approach
to more structured collaboration with more operational measures to grow income and
manage costs. 
6.2 Recommendations
6.2.1 Strategic Alliance
We believe an option worth considering that avoids structural/governance
change/disruption is that of ‘Status Quo+’. This would seek to build on the considerable
collective strengths of the three ALEOs and PKC’s Events team by creating a more

Page 81

78 
PKC - GENERAL
formalised ‘Strategic Alliance’ built on shared objectives and cooperative working
practice. 
An illustrative approach is outlined below:
A Strategic Alliance between Perth and Kinross Council (PKC), Culture Perth and Kinross
(CPK), Perth Theatre and Concert Hall (PTCH), and Live Active Leisure (LAL) would provide
a framework for collaborative leadership in delivering cultural, leisure, and wellbeing
outcomes across the region. Such an alliance would not constitute a merger or legal
restructuring but would formalise a commitment to shared goals, coordinated delivery,
and strategic investment.
Establishment
The alliance would be established through a Memorandum of Understanding
(MoU) signed by the Chief Executives and Chairs of each organisation and by senior PKC
officers. This document would outline shared principles, such as collaboration, inclusivity,
transparency, and set out agreed priorities. A cross-organisational Strategic Alliance
Board would be convened, comprising senior representatives from each partner, meeting
quarterly. PKC would act as a convener and enabler, ensuring alignment with council
priorities and resource planning.
The Alliance would be underpinned by a Joint Strategic Plan, co-developed with input
from communities and staff, aligning organisational strategies with key themes such as
community wellbeing, creative economy development, equal access to services, and
sustainability. This plan would inform joint funding bids, capital development proposals,
and advocacy work at national level.
Operation
The Strategic Alliance would operate as a coordinating forum, not a delivery body. It
would enable alignment without undermining the autonomy or governance of member
organisations. Key operational mechanisms would include:
• Shared Working Groups focused on joint themes (e.g. capital investment,
outreach and inclusion, programming).
• Coordinated Planning Cycles to allow visibility of programming, infrastructure
plans, and funding requirements across partners.

Page 82

79 
PKC - GENERAL
• Data and Evaluation Collaboration to develop shared metrics and evidence
impact across services.
• Joint Staff Development opportunities to foster cross-sectoral skills and
understanding.
Resource-sharing arrangements (for example, for communications, ticketing platforms, or
digital infrastructure) could be explored where appropriate, particularly where cost-
efficiencies and audience benefits align.
Shared Objectives
The Alliance’s shared objectives might include:
• Enhancing community health and wellbeing through joined-up cultural and
active lifestyle initiatives.
• Strengthening inclusion and access for underserved groups across rural and
urban areas.
• Growing the local economy and Perth and Kinross visitor economy developing
career pathways across cultural and leisure sectors.
• Coordinating capital planning to maximise public benefit and avoid duplication of
investment.
• Advocating for national recognition and funding for Perth and Kinross as a
regional cultural leader.
• Seeking efficiencies in service delivery. 
This strategic alliance would aim to strengthen the region’s collective voice, improve
outcomes for residents, and provide a more resilient and agile delivery model for public
cultural and leisure services.
6.2.2 Operational Measures
In addition to the strategic approach suggested above, it will also be necessary to look to
other more practical measures and here the options are limited, and few can be
considered straightforward.  While detailed analysis of each of these is beyond the scope
of the current appraisal, we have provided here some initial thoughts on the following:
• Income growth.

Page 83

80 
PKC - GENERAL
• Property rationalisation.
• Workforce planning.
• Other efficiency measures.   
Income Growth
There is undoubtedly some potential for income growth in all three ALEOs, but most
obviously in LAL and PTCH. Unless a decision is taken to introduce admission charges at
Perth Museum and Art Gallery, the potential for CPK to generate significant levels of
additional income will be limited.  
LAL is likely to realise some savings (see below) and achieve some income growth with
the development of the new PH2O facility, even if this will take some years to materialise.
Beyond this, pricing models may offer some income growth, as well as prioritisation of
revenue generating services (e.g. health and fitness, swimming lessons, gymnastics
classes etc) but the potential scale of this opportunity requires further analysis to quantify.   
PTCH, as noted earlier, is working to a plan to increase its income both through ticket
sales and from commercial hires as well as via fundraising efforts to target more trusts and
foundations. While initial signs are good and progress has been made, this again is likely
to take a few years to reach a level that will have a meaningful impact on the level of
subsidy required from PKC.  
Nonetheless, income growth should certainly be part of a forward strategy for the
services. It is worth noting that we found little to separate the structural options in respect
of their potential to support income growth, and some presented risks as detailed earlier.    
Property Rationalisation
Similarly, the potential of the various structural options to support property rationalisation
did not vary as decisions on this matter ultimately rest with PKC regardless of what ALEO
structures are in place. While any decisions about property rationalisation should be taken
on the basis of due consideration and analysis of evidence relating to, inter alia, building
conditions, usage patterns, financial sustainability, availability of alternative provision, and
wider asset rationalisation plans, we offer the following thoughts:
• PTCH has little scope for rationalisation – closure of either venue would
significantly impact both on the financial viability of the organisation and the

Page 84

81 
PKC - GENERAL
perception and reputation of Perth. This would risk the loss of the significant
economic and community benefits that the organisation creates.
• Similarly, Perth Museum and Art Gallery is a flagship asset for the city and the
region which cannot be relocated to another facility. This leaves CPK with the
library estate, which may offer potential for rationalisation as part of the move
towards more integrated community facilities. While there is always a risk of
political and community resistance, the community hub model which brings
together different services within a single location makes good sense in both
financial and service development terms.  
• Parts of the leisure estate may also lend themselves to consideration within
community hub proposals and should be part of this process. In addition, LAL’s
Strategic Asset Review has identified the potential to close some assets with the
arrival of PH2O which will certainly result in savings as well as providing an
improved offer. 
Again, while the scope for property rationalisation may be limited, this should still be
considered in line with PKC’s wider asset rationalisation plans. 
Workforce Planning
Our experience is that detailed workforce planning can usually deliver savings, sometimes
at a quite significant scale. This requires detailed analysis of rotas and shift patterns
against usage data to identify periods when facilities and overstaffed and underused. It
should also extend to detailed consideration of job roles and where there may be
potential for rationalisation.
As analysis at this level of detail is beyond the scope of the current appraisal, it is difficult
to comment at this time on the potential scale of efficiencies that might be achieved.
However, we recommend that such an exercise is undertaken for all three ALEOs
(recognising that PTCH’s venues are used in a different way) with a view to identifying
efficiencies in staffing structures. 
It is perhaps worth also noting that while larger (more consolidated) structures generally
do offer greater potential for staff savings, in practice the realisation of these does not
often cross service boundaries (i.e. leisure centre staff do not easily transfer to museums).
Gains tend to be within rather than across service areas apart from management and
corporate functions (which have been addressed in the earlier appraisal).

Page 85

82 
PKC - GENERAL
Other Efficiency Measures
Greater collaboration across the three ALEOs can offer some potential for efficiencies in
areas like procurement and purchasing, These are likely to be modest gains, but one area
worth considering is energy.  
Utilities Payment Agency Agreement 
The ALEOs have an opportunity to achieve significant financial savings by establishing an
agency agreement with PKC for utility payments. Under this arrangement, PKC would
manage utility payments on behalf of the ALEOs, with costs offset against the Service Fee
provided by PKC, making it cost-neutral for the Council. 
The key benefit for the ALEOs is reducing irrecoverable VAT paid to HMRC, which is
currently a significant cost. By having PKC manage utility payments, the ALEOs would
avoid VAT charges that cannot be reclaimed. Due to information at the time, we can only
look at the potential benefits from a LAL perspective (as shown in Table 6.1) but there is
no reason why these cannot be replicated across the other two bodies. It should also be
noted that this is based on all LAL properties and it is likely that those that are directly
owned by LAL would not qualify for inclusion in such a scheme. The actual savings for LAL
would therefore likely be lower than the indicative figures provided below. 
Table 6.1: Energy Agency agreement – LAL Example
Item Value
Energy Costs £1,083,497
Irrecoverable VAT rate 11%
Potential Saving £119,185
Similar arrangements across the country have shown success, such as those being
implemented by Active Stirling, West Lothian Leisure and Edinburgh Leisure.  
The agency agreement would reduce operational costs without compromising service
quality. By shifting utility responsibilities to PKC, ALEOs could focus resources on the
delivery of services. It also fosters a stronger partnership between the ALEOs and PKC,
aligning all organisations towards efficient resource utilisation and community
enhancement.

Page 86

83 
PKC - GENERAL
Further discussions and evaluations are needed to refine the proposal and align it with the
financial frameworks of the ALEOs and PKC. Proper planning and negotiation can ensure
the arrangement benefits both parties while maintaining transparency and mitigating
risks. 
Overall, this agreement provides a practical solution, enabling cost savings and
supporting the sustainability of services for the community.

Page 87

84 
PKC - GENERAL
Appendix A: ALEO Review Working
Group
Members of the ALEO Review Working Group are as follows:
ALEO Chief Executives
• Paul Cromwell – Live Active Leisure
• Chris Glasgow – Perth Theatre and Concert Hall (Horsecross Arts Limited)
• Helen Smout – Culture Perth and Kinross 
Perth and Kinross Council Officers
• Charlene Guild, Strategic Lead, Projects & Programmes (Lead)
• Stephen Crawford, Strategic Lead, Property
• Pauline Johnstone, Corporate HR Manager
• Serge Merone, Strategic Lead
• Lisa Simpson, Strategic Lead, Legal & Governance
• Scott Walker, Strategic Lead, Finance & Business Support 
• Steve MacDonald, Service Manager, Economic Development
• Norman Ballantine, Transformation & Change Programme Manager
• Alan Taylor, Strategic Lead, Customer & Digital Services