Democracy Spraffa

Appendix 1 - PKC Annual Performance Report 2024-25

Perth and Kinross Council · 29 October 2025
Back to Perth and Kinross Council — 29 October 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

ANNUAL PERFORMANCE REPORT 2024/25 
PKC - GENERAL
Appendix 1

Page 2

Annual Performance Report 2024/25
1
PKC - GENERAL  
Contents
Contents 
Introduction 2
Performance summary 3
Priority: Tackling poverty 4
Priority: Tackling climate change and supporting greener sustainable places 11
Priority: Developing a resilient, stronger and greener local economy 19
Priority: Enabling our children and young people to achieve their full potential 268
Priority: Protecting and caring for our most vulnerable people 37
Priority: Supporting and promoting physical and mental wellbeing 45
Priority: Working in partnership with communities 52
Key contact 59

Page 3

Annual Performance Report 2024/25
2
PKC - GENERAL
Introduction
Welcome to our Annual Performance Report for 2024/25.
This report provides an overview of the work undertaken by Perth
and Kinross Council over the past year. It reflects the dedication of
our teams, the strength of our partnerships, and the resilience of
our communities in the face of ongoing challenges.
Our vision remains clear: 
a Perth and Kinross where everyone can live life well, free from
poverty and inequality. 
Delivering on this ambition requires us to focus our efforts where
they are needed most - supporting those in greatest need,
protecting our most vulnerable residents, and creating the
conditions for a thriving local economy.
In 2024/25, we continued to invest in targeted support for families
and individuals experiencing poverty, expanded opportunities for
fair work and employability, and strengthened our approach to care
and protection. At the same time, we have worked to deliver
services more efficiently, making the best use of the resources
available to us in a climate of increasing financial pressure.
This report is structured around the Council’s seven strategic
priorities and includes performance data, case studies, and links to
further information. It also reflects on areas where improvement is
needed and outlines how we are responding to emerging
challenges and opportunities.
We are proud of the progress made this year and grateful to
everyone who has contributed - including Council officers, elected
members, partners, businesses, and community and voluntary
groups. We hope this report provides a clear account of our
performance and our ongoing commitment to delivering high-quality
public services for the people of Perth and Kinross.     
Councillor Eric Drysdale   Thomas Glen
Council Leader    Chief Executive

Page 4

3 
PKC - GENERAL
Performance summary 
Performance against priorities and actions 
The following pages highlight just some of the work we have
undertaken with our communities and partners across the private,
public and third sectors throughout the year. This is listed by priority
area as outlined within our Corporate Plan 2022/23-2027/28.
Case Studies
Each priority area contains a short summary of relevant case
studies, which can be viewed on PK Performs website.
Key Performance Indicators
Each priority area also includes Key Performance Indicator (KPI)
data with an indication of change over the last year and
accompanying commentary. Data is shown between 2021/22 –
2024/25, or the most recent year available.   
Caution should be applied when interpreting KPI data, as these are
only indicative of performance. Changes in performance should be
considered in the context of the current operating environment,
challenges and whether we control, influence or are informed by the
services which are reflected in the data. It is also important to note
that the APR covers the period from April 2024 to March 2025. Data
and evidence is collected from various sources, which can have
different reporting timescales out-with the Council’s control, and
therefore some data is reported in arrears, or some is not available
until later in the year. 
Targets
Targets for each KPI are also presented where relevant and
highlighted by a traffic light system as to whether the 2024/25
performance has met the target.
KPI Overview
KPI Annual Change
Change since
last reporting
year is
favourable
Change since last
reporting year is
unfavourable
Change
since last
reporting
year is static
No data
available to
make
comparison 
   N/A
33 12 5 4
KPI performance against target
Met or
exceeded
target 
Target
not met  Target
Not Set 
24/25
Target Set
but data not
yet available
Not appropriate
to set target
18 18 7 3 8
Supporting information
Best Value themes
In addition to reporting on performance against the actions and
indicators set out within our Corporate Plan and in line with the
statutory performance information direction, we have created a
supplementary report on our performance aligned to the Best Value
themes. Read the Best Value Themes Performance Report 2024/25
on our PK Performs website.
Financial information 
We have also included financial information online which details
where we get our money from and how that budget is used. Read
the supporting financial information on our PK Performs website.

Page 5

4 
PKC - GENERAL
Priority: Tackling poverty 
Action: Prevent and mitigate the impacts of poverty
for children living in Perth and Kinross 
Perth and Kinross has made encouraging progress in reducing child
poverty. The local rate is now 3.8% below the national average,
nearly double the previous gap of 2%. This improvement has
improved the area’s ranking to 7th nationally for lowest child poverty
rates. While these results are promising, data will be closely
monitored over the next two years to ensure the improvement is
sustained. 
Key activities contributing to this in 2024/25 are included below
and detailed further in the Children’s Scorecard 2024/25:
• A network of public, third sector, and community organisations
collaborated to deliver holistic family support, focusing on
employability, income maximisation, and wellbeing.
• Strategic efforts across all partner organisations supported
parents into work by providing access to affordable housing,
transport, childcare and employability support. 
• The Support and Connect programme trained frontline workers
to deliver wraparound support, helping families transition from
crisis support to sustainable livelihoods.
• The Children’s Scorecard tracked service responsiveness to
people with lived experience of poverty and monitored progress
against child poverty reduction targets.
• Through the Future for Families project we: engaged with 238
families, including 199 new families; supported 45 parents into
self-employment; and provided digital devices to 98 families
experiencing digital poverty.
• We helped remove barriers to employment for parents by
providing 3,229 childcare places across the public and private
sectors and funding 300 Strong Start places for 2-year-olds.
• We allocated over £82,500 to support holiday food for school
children and 70 children benefited from free places at the
Fuelled for Fun holiday programme.
• Despite increased demand for temporary accommodation due
to the housing crisis, our ‘Home First’ approach helped maintain
stability in terms of families being in temporary accommodation.
Between 2020 and 2024, the number of households in
temporary accommodation remained stable, with 6 households
(15 children) in March 2025 compared to 8 households (16
children) in March 2024 – reducing disruption for families which
is critical for child development and wellbeing. In the same
period the national figure rose by 36%. 
CASE STUDY
The Family Advice and Community Connections
Service was commissioned from Aberlour and launched in
September 2024 using Whole Family Wellbeing Fund
funding. It provides flexible, early help to families across
Perth and Kinross, allowing them to access support directly
without professional referral. 
Action: Mitigate cost of living pressures for
households experiencing or at risk of poverty 
We have taken a targeted, person-centred approach to easing cost-
of-living pressures for households in or at risk of poverty. Through
financial support, early intervention, and strong engagement, we
have helped residents maintain stable housing and improve their
financial wellbeing. Key activities contributing to this include:
• In 2024/25, 564 tenants received £203,000 in financial
assistance through our Tenancy Sustainment Fund (TSF),
helping them manage arrears and maintain stable housing. The

Page 6

5 
PKC - GENERAL
fund uses a flexible, person-centred approach to ensure support
reaches those who need it the most.
• Our rent collection strategy continues to deliver exceptional
results, achieving an in-year collection rate of 100.17% in
2024/25, up from 99.15% the previous year. This result,
supported by a 53-week rent year, reflects the success of our
tenant-focused approach that balances financial rigour with
personalised support. Key enablers of this success include:
• Digital Inclusion Project: provided devices, data, and
training to tenants to improve digital access.
• Centralised Arrears Team: took a proactive approach to
early intervention and tailored support to prevent arrears
increasing.
• Tenant engagement: over 6,700 support calls handled,
strengthening responsiveness when they need it.
• Rent arrears reduced significantly, highlighting the effectiveness
of our integrated support model
• current arrears fell from 9.59% to 8.03%
• gross arrears dropped from 10.98% to 8.83%. 
• The Financial Inclusion Project, in partnership with Citizens’
Advice Bureau, delivered:
• £784,052 in financial gains for tenants.
• Support for 677 tenants in arrears 
Action: Maximise income from benefit entitlement
and concessions for households experiencing or at
risk of poverty
In 2024/25, we strengthened our efforts to help residents increase
their income through benefits and financial support. By focusing on
outreach, targeted funding, and inclusive service delivery, the
Council ensured that support reached those most in need -
particularly in rural areas and among vulnerable groups.
Recognition at a national level highlighted the impact of this work,
which continues to evolve through strong partnerships and
community engagement. Key activities contributing to this in
2024/25 include:
• £9.2 million in additional benefits secured for Perth and Kinross
residents by our Welfare Rights service in 2024/25. This
represents an 8% increase in financial outcomes from 2023/24,
reflecting improved service promotion, follow up and tracking
processes.
• £269,000 distributed through the Financial Insecurity Fund to
over 1,400 households, including those without recourse to
public funds. Despite reduced funding and fewer applications,
over 66% of payments were directed to rural households facing
financial hardship.
• In October 2024, our Welfare Rights and Welfare Fund teams
won the Institute of Revenues, Rating and Valuation’s
Excellence in Social Inclusion Performance Award for Scotland,
recognising their impactful work in prisons and foodbanks
across urban and rural communities.
• We strengthened access to Welfare Rights and Welfare Fund
services by reducing barriers and increasing awareness in
targeted communities. Key examples include:  
• Beginning regular outreach at Double Dykes and partnering
with Broke Not Broken to support Gypsy/Traveller
communities in Kinross. This improved engagement, built
trust, and strengthened relationships, with officers now
being accepted and welcomed into the communities.
• Delivering a six-month outreach programme at @Scott
Street .This led to improved referral rates and stronger
partnerships, enabling Social Work teams to move to online
referrals and increasing client engagement to ensure full
entitlements are obtained.
• Partnering with YMCA, Creative Exchange, and others to
enhance welfare rights support for young people aged 16–

Page 7

6 
PKC - GENERAL
25, ensuring tailored assistance for this age group. This is
the first time that young people have been specifically
targeted with this type of support in Perth and Kinross.
• Establishing a weekly Welfare Fund outreach service in
HMP Perth in collaboration with the Scottish Prison Service.
This supported over 90 prisoners preparing to reintegrate
into the community, helping them access entitlements and
stabilise their transition.   
CASE STUDY
Provision of Welfare Rights Outreach in Prison – This
case study highlights our efforts to ensure provision of
financial support for prisoners and their families, to improve
the transition from prison to community for individuals due to
be released. We are the first and only local authority in
Scotland to provide this outreach service. 
Action: Promote and encourage local employers to
follow the principles of the Scottish Government
Fair Work Action Plan, including the real Living
Wage and Scottish Business Pledge
We continue to champion the Scottish Government’s Fair Work
Action Plan by embedding fair work practices across our own
operations and encouraging local employers to do the same. Our
focus remains on ensuring fair pay, inclusive recruitment, and
meaningful support for businesses committed to the Real Living
Wage and the Scottish Business Pledge. Key activities contributing
to this in 2024/25 include:
• Ensuring that all businesses receiving Council grant funding paid
the living wage to their employees
• Supporting local employers to recruit through targeted incentives
where roles pay the Real Living Wage.
• Paying the Real Living Wage to all our employees, including
apprentices
• Through our Futures for All Employer Recruitment Incentive
(ERI), we provided financial and employability support to 48
businesses – 20 in Perth and 28 in rural areas.  All participating
employers paid the living wage to new recruits (except
apprentices), with a focus on helping individuals facing barriers
to employment to access fair work opportunities.
• Further developing our Customer Relation Management (CRM)
system to improve our intelligence and develop enhanced
engagement with our Top 100 businesses. 
Areas of Focus
• Better understand and capture the value of preventative spend
and how funds are allocated to develop a budgeting approach
based on identified need and overall wellbeing 
• Review actions contributing to ongoing reduction in child poverty
levels to identify and enhance the most effective interventions. 
• Expand Fast Online Referral Tracking system referral pathways
and deliver Support and Connect training to frontline staff and
partners to provide a more consistent and comprehensive
support service 
Links to other Performance Information
➢ Child poverty action in Perth and Kinross – Perth & Kinross
Council (pkc.gov.uk)

Page 8

7 
PKC - GENERAL
Key Performance Indicators related to this priority:     
Data will be indicative of performance and should be considered in the context of the current operating environment and level of influence.
Key Actions
(summary)
Indicator Control /
Influence
Performance Comments
20/21 21/22 22/23 23/24 24/25 Annual
Change Target Target
Met/
Not Met 
Prevent and
mitigate the
impacts of
poverty for
children 
Percentage
of children
living in
poverty after
housing
costs in
P&K 
Inform 18.7%
(note,
viewed as
an outlier
due to
small
sample
as a
result of
COVID)
21.9% 21.7% 19.2% N/A

10% by
2030
(SG
Target)
N/A  2024/25 information will not be published
until June 2026; commentary is based on
the most recent data published. All figures
are based on estimates using Scottish
Government (SG) data. 
Perth and Kinross continue to outperform
the national average in tackling child
poverty. This local rate has fallen
from 21.7% to 19.2%, compared to the
Scottish average of 23%. This 1.5%
reduction has widened the gap between
Perth and Kinross and the national average
to 3.8%, nearly double what it was
previously. 
This improvement may be linked to:
• Perth and Kinross recording the second
highest growth in affordable housing
per 1,000 residents between 2018-2024
• Local authority and private sector rental
charges remaining below the national
average
• Strong performance in promoting and
delivering Best Start and Crisis Grants 
While these figures are encouraging,
continued monitoring over the next two

Page 9

8 
PKC - GENERAL
Key Actions
(summary)
Indicator Control /
Influence
Performance Comments
20/21 21/22 22/23 23/24 24/25 Annual
Change Target Target
Met/
Not Met 
years will be essential to confirm whether
this represents a sustained improvement. 
We will continue to prioritise areas where we
are performing less well against the national
average, such as free school meal uptake
and child poverty in urban wards.
Mitigate
cost of
living
pressure
for
households
experiencin
g and at
risk of
poverty 
Number of
P&K
households
provided with
energy
efficiency
and/or low
carbon
heating
advice (PKC
funded)
Influence 545 256 884 2,205 1,638 500    Advice was provided to a total of 1638 via
the Scarf energy advice programme as a
result of both the Housing and Climate
Change funding streams.
Whilst there has been a decline in the
number of households supported in 24/25,
this is due to this measure only capturing
advice services funded by the Council.
Figures for 23/24 included the Heat Project,
which continues to support residents but is
now funded elsewhere. This year we are
taking a more targeted approach which may
result in a further reduction in the number of
households being provided with advice, but
which could lead to more impact within
Perth and Kinross.
Number of
new affordable
homes,
including new
build and buy
backs
Control 124
(100 new
build, 
24 buy
backs)
308
(276 new
build, 
32 buy
backs)
203
(167 new
build, 
36 buy
backs)
173
(105 new
build, 
48 buy
backs, 
20 empty
homes)
264
(37 new
builds, 116
buy backs,
23 empty
home and 18
acquisitions*)
  
210    In 2024/25, 264 new affordable homes were
completed across Perth and Kinross by us
and our Registered Social Landlord
partners. Of these, we delivered 37 new
build properties and purchased 116 as
buybacks. The Local Housing Strategy sets
a yearly target of 210 new affordable homes
a year, based on assessed housing need
and demand. While this is shown as an
annual target, delivery is over a 5-year

Page 10

9 
PKC - GENERAL
Key Actions
(summary)
Indicator Control /
Influence
Performance Comments
20/21 21/22 22/23 23/24 24/25 Annual
Change Target Target
Met/
Not Met 
strategy as annual delivery may vary due to
the nature of new housing development. To
maintain progress while our new-build
programme is being established, the
decision was taken to exceed the standard
buyback target of 40 homes. This approach
has helped ensure a steady supply of
council housing during a period of transition.
We also acquired 18 homes from the
National Trust of Scotland. 
Maximise
income from
benefits and
concessions
Number of
Scottish
Welfare Fund
Crisis Grant
applications
Influence 6,336 5,498 6,539 7,421 7,856

N/A
(not
appropriate
to set
targets) 
N/A Since June 2023, first point of contact calls
have been re-routed directly to the Welfare
Rights team. This change has led to an
increase in applications, driven by improved
access to specialist advice, a rights-based
approach to crisis support, and external
pressures such as Universal Credit (UC)
Managed Migration; UC deductions and the
ongoing cost of living crisis. 
The new call handling process ensures
queries are managed end-to-end by trained
advisors, providing accurate and timely
support from the outset.
In 2024/25, over 100% of the Scottish
Government allocation of £653,000 for the
Scottish Welfare Fund was spent on Crisis
Grants. Additional local funding was used to
meet the remaining demand for Crisis
Grants and to fully fund Community Care
Grant awards. Of the 7,856 applications
received, 5,118 awards were made.

Page 11

10 
PKC - GENERAL 
Key Actions
(summary)
Indicator Control /
Influence
Performance Comments
20/21 21/22 22/23 23/24 24/25 Annual
Change Target Target
Met/
Not Met 
Total amount
of benefit
income gained
as a direct
result of
involvement
from the
Welfare Rights
Team
Influence £5.5m £5.3m £6.5m £8.5m £9.2m

N/A
(not
appropriate
to set
targets)
N/A In 2024/25, the Welfare Rights service
helped Perth and Kinross residents gain an
additional £9.2 million in benefits – an
increase of 8% compared to 2023/24. The
service received 8,109 referrals, with 6,315
of these being new clients. This rise in
referrals reflects targeted efforts to promote
the service and maintain contact with
customers, enabling better tracking of
outcomes.
Promote and
encourage
principles of
the Scottish
Government
Fair Work
Action Plan
Number of
employers
signed up as
Living Wage
employers in
Perth &
Kinross
Influence N/A New
Indicator
91 97 100 102 

110    This figure shows a slight increase on last
year, whilst not meeting the increased
target. This KPI does not show the full
picture of employers who pay the real Living
Wage in Perth & Kinross. The figures are
only inclusive of those subscribed to the
Living Wage Foundation Pledge scheme,
where accreditation is paid for. It is
recommended that this KPI be removed with
the existing KPI titled Percentage of
people earning less than the real Living
Wage being a more relevant indicator for
the action and priority at a more granular
level.
Percentage of
people earning
less than the
real Living
Wage
Influence 25.3% 16.5% 12% 13.8%
(provis.)
N/A
Awaiting Data
TBC15% N/A
(24/25
Target
Set but
data not
yet
available)
The 2023/24 figure is currently provisional
ahead of finalisation in November 2025,
when the provisional figure for 2024/25 will
also be released.

Page 12

11 
PKC - GENERAL
Priority: Tackling climate change
and supporting greener sustainable
places 
We continue to deliver the Climate Change Strategy and Action
Plan for Perth and Kinross. This sets out our plans and actions to
reduce carbon emissions and build resilience, meet our regulatory
requirements and protect our environment for current and future
generations. 
Action: Support the prioritisation of sustainable,
cleaner and greener transport in line with the
National and Regional Transport Strategies 
We closely monitor UK and Scottish Government targets relating to
green transport to ensure that we adhere to these. We also
participate in Transport Scotland’s Policy Consultative Group to
contribute to and learn from peer organisations. 
We continue to support our Community Transport Groups across
Perth and Kinross with our Community Transport Forum and by
directly liaising with communities who approach us seeking support
to establish a new Community Transport Group.  The Public
Transport Unit has invested the majority of the Scottish
Government’s Community Bus Fund in purchasing MPVs for long
term loan to several Community Transport Groups to enable them
to deliver transport locally with volunteer drivers. 
Elected members approved a motion to transfer Council minibuses,
which have reached the end of their Council life, to Community
Groups, rather than sending the vehicles to auction. 
Free bus travel was funded throughout Perth and Kinross on the
first Saturday of each month, from June 2024 - March 2025, for
passengers who do not hold a free bus pass.  A total of 38, 042
passengers benefited from this offer.
Action: Improve the energy efficiency of our Council
housing stock and public buildings, and encourage
our partners and private householders to consider
where they can make improvements 
In 2024/25, we made strong progress in improving the energy
efficiency of homes and supporting low-carbon living. Our work
focused on delivering new energy-efficient housing, upgrading
existing stock, and enabling private homeowners to access funding
for improvements. These efforts contribute directly to reducing fuel
poverty and lowering carbon emissions across Perth and Kinross.
Key activities contributing to this in 2024/25 include:
• 37 new affordable social rent homes were completed in
Methven, Rattray and Kinross, all with high insulation levels and
solar panels to reduce energy bills and carbon footprint. 
• Prioritising energy efficiency improvements to homes in Energy
Performance Certificates (EPC) Bands E and F, which currently
represent 2.6% of our housing stock. This work will contribute to
ensuring all our homes meet the Scottish Government’s
minimum EPC Band D target by 2025. Access challenges
remain and our housing teams are working to resolve this. 
• 440 properties were upgraded to meet the Energy Efficiency
Standard for Social Housing (EESH) standards in 2024/25. As
of March 2025, 87% of properties meet EESH - a 5%
improvement from the previous year. We continue to work with
tenants and teams to improve more properties where possible.
• A £6.5m refurbishment began at the Double Dykes Gypsy
Traveller site in Perth, replacing existing chalets with more
energy efficient homes. Five chalets were delivered by April
2025 with energy-efficient heating, hot water systems and
renewable technology.

Page 13

12 
PKC - GENERAL
• Over £3m in grants were issued by March 2025 through the
Home Energy Efficiency Programmes for Scotland Area
Based Schemes (HEEPS ABS) and ECO4 schemes to help
private homeowners improve the energy efficiency of their
properties.
• 1,638 households were provided with free home energy advice
to help reduce energy bills, write off energy debt, improve
energy efficiency and reduce damp and mould.   
Action: To conserve and enhance the biodiversity of
our natural environment 
We made strong progress in protecting and improving biodiversity
across Perth and Kinross, recognising its vital role in building
climate resilience. Our actions have focused on tree planting,
habitat restoration, community engagement, and targeted
ecological improvements. These efforts help us create healthier
ecosystems, support wildlife, and strengthen our response to
climate change. Key activities contributing to this in 2024/25
include: 
• Planting 3,142 trees in our open spaces – an increase from
2,512 in 2023/24 – boosting carbon capture and contributing to
climate resilience and flood mitigation.
• We supported the Grow Wild initiative by distributing the locally
cultivated Westbank Wonder Mix, a native pollinator seed blend
that reduces reliance on water-intensive annuals and
strengthens Nature Networks. Community involvement was
central to this success, with 20 groups receiving native
herbaceous plants, 15 receiving wildflower seeds, and 7
receiving pollinator shrubs to enrich local green spaces.
• Our ecology reports guided targeted biodiversity work in parks
and graveyards in collaboration with local communities,
including removing invasive species. Meanwhile, pond
enhancement projects at six sites introduced native planting,
hedgehog-friendly designs, and amphibian hibernacula—
creating thriving habitats for diverse wildlife.
• 16 Nature Restoration Fund grants were awarded, with three
more deferred to 2025-26. These empowered council teams
and community groups to make lasting improvements for
nature. 
• The community NRF projects spanned around 199ha of
restoration and included: invasive species control; riparian
habitat restoration; tree and shrub planting; wildflower meadow
creation; pond enhancement; surveying; a new tree nursery;
and provision of tools and training for sustainable land
management. 
CASE STUDY
Biodiversity Towns and Villages Project funding of £277k
was utilised to set up 3 Biodiversity towns, 10 Biodiversity
villages and 2 Biodiversity neighbourhoods.  This case
study highlights projects rolled out across communities that
are helping to restore natural habitats which provide food
and shelter for wildlife, supporting a thriving ecosystem. 
Action: To adapt to and mitigate the impact of
climate change on the way we operate
We are taking practical steps to reduce the impact of climate
change on our operations and communities. From flood protection
and waste reduction to sustainable reuse initiatives, our work is
helping to build resilience, protect homes and infrastructure, and
support a circular economy. These actions reflect our commitment
to climate adaptation and mitigation across Perth and Kinross. Key
activities contributing to this in 2024/25 include:

Page 14

13 
PKC - GENERAL
• We advanced flood risk management by completing the Perth
Surface Water Flood Study and starting studies and plans in
Bridge of Earn, Comrie, and Scone. We also progressed the
Milnathort Flood Protection Scheme and began preparatory
work for the Blairgowrie & Rattray Surface Water Management
Plan, and data collection to support the outline design of the
Dunkeld and Craigie Flood Protection Schemes.
• Construction of the Comrie Flood Protection Scheme began
following Council approval in November 2023. It remains on
track for completion anticipated in Q4 2026 and within budget.
The South Kinross Flood Protection Scheme was formally
notified to the Scottish Government, with a Local Authority
Hearing scheduled for October 2025. 
• Our dedicated two-person Watercourse Inspector team carried
out routine inspections and maintenance of key watercourses
throughout the year, replacing the previous seasonal student
support. In total, £4.3 million was invested in capital projects
and £0.4 million in revenue projects to reduce flood risk and
support essential works.
• We launched a mattress reuse project with local charity PUSH,
supported by £24,873 funding from the Zero Waste Scotland
Small RIF fund. Donated mattresses are cleaned, sanitised
sold affordably - diverting mattresses from incineration and
creating employment opportunities. 
• Following the successful securing of £2.72m of capital
investment from the Scottish Government Recycling
Improvement Fund (RIF), we introduced a new twinstream
collection, with an improved kerbside recycling service for
around 97% of householders. Whilst the 2024/25 performance
figures are awaiting verification, updated 2023/24 figures show
an overall increase in household recycling rates to 51.7%.
• An additional bonus with the separation of products has
resulted in a financial benefit with an increase of income from
recyclable items. 
CASE STUDY
Cross Tay Link Road Carbon Management embedded
sustainability into every stage of design and construction,
achieving over 51,000 tCO₂e in carbon savings. Key
innovations included the use of flexible pavement with a
hydraulically bound material (HBM) base, low-carbon
concrete mixes, and sustainable drainage systems. Carbon
reduction was made a contractual requirement, with
procurement and design decisions driving measurable
environmental benefits. The project is now recognised
nationally as a leading example of low-carbon infrastructure
delivery. 
Areas of Focus
• Ensure we have a cleaner and greener Council fleet 
• Develop local public transport solutions which set the
needs of residents and the environment as top priority
• Improved energy efficiency and reduction in carbon
emissions in the Council estate
• Increase provision of biodiversity sites 
Links to other Performance Information
➢ Waste Management Plan 2010-2025 -  Final Update
(Plan being revised in early 2026) 
➢ Fleet Decarbonisation Strategy
➢ List of Nature Restoration Fund Projects 2024/25

Page 15

14 
PKC - GENERAL
Key Performance Indicators related to this priority:
Data will be indicative of performance and should be considered in the context of the current operating environment and level of influence. 
Key Actions
(summary) Indicator Control /
Influence
Performance Comments
21/22 22/23 23/24 24/25 Annual
Change Target
Target
Met/Not
Met 
Support the
prioritisation
of
sustainable,
cleaner, and
greener 
Number of
publicly
available
charging
devices per
100,000
population 
Influence 86.2 125.5 133.9 175.4

349  It should be noted that the target for this KPI in
previous reports had been based on the number of
charging connectors, of which there are two in every
unit. The target has been amended to reflect the
number of units in line with the KPI measure going
forward. It will also rise with a predicted 30% increase
in uptake of electric vehicles following a local strategy
developed alongside Urban Foresight in 2023.
However recent law changes on the taxation of electric
vehicles may affect the actual uptake. 
We estimate that planned progress is delayed by
around a year, due to delays in funding. A large-scale
contract is set to be awarded in April 2026,
earmarking the install of approx. 100 charging units. 
Percentage
of Council
fleet
vehicles
that are
electric or
other zero
direct
carbon fuel
technologie
s
Control 5.3% 3.8% 3.6% 4.5%

3.85%    The Council added 3 more electric vehicles to its fleet
in 2024/25. We will continue to closely monitor
developments in evolving new technologies,
particularly electric and hydrogen. The Binn Ecopark
Hydrogen Facility being developed by Green Cat
Energy in Glenfarg, could make hydrogen a viable
option within Perth and Kinross. If it is completed by
June 2027 this would allow the Council’s Fleet Team
to review the options for using hydrogen as a fuel
source for our HGV fleet ahead of the national target
of ceasing petrol/diesel vehicle production in 2030. 
We are working on a project looking at the introduction
of a hydrogen facility within our Friarton Depot. If
successful, it could see hydrogen being available on

Page 16

15 
PKC - GENERAL
Key Actions
(summary) Indicator Control /
Influence
Performance Comments
21/22 22/23 23/24 24/25 Annual
Change Target
Target
Met/Not
Met 
site also from 2027. Using Hydrotreated Vegetable Oil
(HVO) in the Council waste fleet should also see CO2
savings of c1000 tonnes by 2027.
Improve the
energy
efficiency of
our
buildings,
and
encourage
our partners
and private
householder
s to consider
improvement
s
Percentage
of Council
housing
meeting the
Energy
Efficient
Standard 2
for social
housing
(minimum
EPC B)
Control 6.2% 6.6% 7.1% 8.0%

8.0%    Of the total housing stock (8,226 properties as of 31
March 2025), we’ve increased the number meeting
the Energy Efficient Standard 2 for Social Housing
from 565 to - an increase of 92. This was achieved
through new builds and investment in existing
properties, despite access challenges.
Scope 1
and 2
Emissions
from
Council
Non-
Domestic
Estate
(tonnes
CO2e) 
Control 10,761 9,226 9,080 8,976

Rolling
3% per
annum
reductio
n
Although the national electricity emissions factor
remained unchanged, which means switching from
gas to electricity would not lead to a drop in carbon
emissions, our overall emissions still fell. This is due
to reduced energy use across our buildings and
services. It should be borne in mind that emissions will
be heavily influenced by the assets held within the
estate and reductions have been achieved despite
increases in Gross Internal Floor Area with inclusion
of Perth Museum and Bells Sports Centre.
To conserve
and enhance
the
biodiversity
of our natural
environment 
Area
grassland
managed by
PKC for
biodiversity
improvemen
t objectives
(ha)
Control 21.8ha 40.4ha 40.4ha 121.5ha

N/A
(Target
not set)
N/A We more than doubled our management of grassland
areas included in Grow Wild, increasing from 49.16ha
to 121.5ha. Early monitoring has shown noticeable
increases in insect and flower populations in unmown
areas.

Page 17

16 
PKC - GENERAL
Key Actions
(summary) Indicator Control /
Influence
Performance Comments
21/22 22/23 23/24 24/25 Annual
Change Target
Target
Met/Not
Met 
To adapt to
and mitigate
the impact of
climate
changes on
the way we
operate
Total
household
waste
recycled/co
mposted as
% of all
household
waste 
Influence 50.2% 49.3% 51.7% N/A
(Awaiting
verification)

60%  2023/24 figures have been revised following SEPA
verification and show an increase of 2.4% on the
previous year. 2024/25 data is yet to be verified;
however we project that there is a further increase,
largely due to the new kerbside recycling system
(twinstream).
Previously this was documented in the Waste
Management Plan (WMP), however going forward this
will be incorporated in the Circular Economy Strategy.
Historic data for this KPI has been amended to reflect
a consistent reporting period aligned with the calendar
year data reported to SEPA.
Climate
Change
Assessment
Tool (CCAT)
overall score
Control 61% 69% 71% 74%

78% Our score improved by 3%, with strong gains in
Adaptation (up from 79% to 96%), Emissions (up by 5
points) and Behaviour (up by 5 points).
Procurement remains the lowest category at 38%,
with no change from last year. Improvement is aimed
for in future years following a new five-year
Sustainable Procurement Strategy being approved in
June 2024. Governance dropped by 18 points, despite
an increase in the accountability by senior
management score. The 2023/24 score was artificially
inflated due to a one-off internal audit that wasn’t
repeated this year.

Page 18

17
ANNUAL PERFORMANCE REPORT 2024/25
PKC - GENERAL
Priority: Developing a resilient,
stronger and greener local economy
Action: Support and promote business growth,
business and place innovation and investment in
both our urban and rural areas 
In 2024/25, we strengthened our support for business growth and
innovation across Perth and Kinross, with a particular focus on
start-ups, rural enterprises, digital industries, and inward
investment. Our efforts have led to increased engagement,
exceeded programme targets, and laid the groundwork for future
sustainable development. We continue to build a dynamic and
inclusive business ecosystem that reflects our commitment to
entrepreneurship, creativity, and economic resilience. Key activities
contributing to this in 2024/25 include: 
• Supporting 252 business start-ups through Business Gateway,
exceeding last year’s figures and surpassing our New Start and
Pre-Start Plus programme target with 22 businesses supported.
• Leading the Tayside region in Business Gateway Growth
referrals, with 23 high-potential businesses projecting turnover
increases of £200k+, highlighting strong entrepreneurial
momentum.
• Providing tailored support to 254 micro-enterprises, self-
employed individuals, and social enterprises through GrowBiz,
significantly exceeding our target of 180.
• Enabling 231 businesses to participate in learning and
networking sessions, with 43% aligned to our targeted growth
sectors, and 76 new businesses supported to begin trading.
• Expanding Perthshire Artisans to support 168 creative sector
businesses—well above our target of 36—demonstrating a
thriving rural enterprise culture.
• Designing work and related investigations for the first phase of
the Perth Eco-Innovation Park (11ha), progressing Heads of
Terms to unlock sustainable business growth.
• Maintaining steady interest in our industrial sites, including
Northfield Business Park, with ongoing enquiries from
businesses seeking premises in established hubs.
• Launching a refreshed Invest in Perth website in October 2024,
improving mobile responsiveness and accessibility, resulting in a
24% increase in traffic over six months.
• Introducing a new Customer Relationship Management system
in January 2025 to enhance tracking of business interactions,
improve economic intelligence, and strengthen our engagement
impact.
• Continuing to support innovation through the Perth Ideas Centre
at Creative Exchange, offering entrepreneurs and Small to
Medium Enterprises access to technical equipment, training, and
events focused on creative and digital industries.
• Hosting Techscaler, delivered by CodeBase, at the Ideas Centre,
reinforcing Perth and Kinross’s profile as a hub for scaling tech
businesses.
• Delivering The Angel’s Share programme, enabling local
businesses to pitch to certified investors, attracting inward
investment and encouraging relocation to the region. 
Action: Invest in innovative green power and smart
technology solutions to reduce reliance on
electricity from the national grid and create
opportunities for business growth and regeneration
We are reducing reliance on the national grid by investing in low-
carbon energy and smart technology—supporting both

Page 19

18
ANNUAL PERFORMANCE REPORT 2024/25
PKC - GENERAL
sustainability and local economic growth. Key activities contributing
to this in 2024/25 include: 
• We progressed two major clean energy projects featuring heat
pumps and solar panels, helping to reduce emissions and
energy costs across our estate.
• We installed a medium-scale heat pump system at a rural
primary school, replacing oil heating with a cleaner alternative.
• We are actively exploring new partnerships and agreements to
expand solar power and battery storage, aiming to increase on-
site energy generation and reduce grid dependency. 
• As the national grid becomes greener, we remain committed to
using electricity—especially through heat pumps—as our main
heating source, while continuing to invest in smart, low-carbon
technologies. 
Action: Promote what our city and towns have to
offer to businesses, investors and tourists by
capitalising on built and natural heritage and assets
such as the new Perth Museum and the benefits to
the whole area of Perth’s status as UNESCO City of
Craft and Folk Art 
In 2024/25, we continued to position Perth and Kinross as a vibrant
and distinctive destination for business, investment, and tourism. By
leveraging our cultural identity, natural assets, and international
recognition as a UNESCO City of Craft and Folk Art, we delivered
impactful programmes and infrastructure that enhanced community
engagement, boosted visitor numbers, and supported economic
growth. Key activities contributing to this in 2024/25 include: 
• Promoted Perth and Kinross as a dynamic destination by
building on our UNESCO City of Craft and Folk Art status and
showcasing our cultural and natural assets.
• Delivered a curated programme of high-impact creative projects
through local, national, and international partnerships, with
ongoing work to embed creativity into everyday community life
through new assets and infrastructure.
• Grew the Perth City & Towns platform to over 100,000 active
users, supporting local businesses and events through a multi-
platform marketing strategy and targeted campaigns with
partners such as Expedia, TripAdvisor, and Scotland’s Tay
Country.
• Achieved a 25.1% increase in total visitor numbers, with day
visitors up 21% and overnight stays up 21.6%, contributing to a
33% rise in direct visitor spend and a 37% increase in the
sector’s overall economic impact.
• Strengthened cultural tourism and regeneration through strategic
promotion and investment, including the successful opening of
the new Perth Museum as a flagship attraction. 
CASE STUDY
The opening of Perth Museum marked a major cultural
milestone for the city, transforming the historic City Hall into
a vibrant heritage destination. With £27.5 million in funding
from the Council and the Tay Cities Deal, the museum
welcomed over 128,000 visitors in its first four months.
Community pride was reignited through the return of the
Stone of Destiny, while the museum’s design and
programming aim to boost tourism, celebrate local history,
and reposition Perth as a key cultural hub in Scotland.

Page 20

19
ANNUAL PERFORMANCE REPORT 2024/25
PKC - GENERAL
Action: Support individuals into work and to progress
into better paid work, encouraging businesses to
access initiatives to create new opportunities for
those furthest from the employment market and
those currently in low wage jobs 
We are helping people across Perth and Kinross access learning,
training, and employment—especially those furthest from the job
market or in low-paid roles. By working with local partners and
businesses, we are creating pathways into sustainable, better-paid
work and supporting inclusive economic growth. Key activities
contributing to this in 2024/25 include: 
• We supported 618 adults to achieve learning outcomes – more
than double our target of 300 – through SQA-accredited courses
and short programmes in communications, numeracy, digital
skills employability, volunteering and English for Speakers of
Other Languages (ESOL). 
• We awarded £92,000 through the Adult Learning in the
Community Fund to support 8 local organisations, reaching 220
learners through a diverse range of projects. Projects included
ESOL support, rural skills training, digital literacy, employability
programmes, and volunteer driver training.
• Our adult advisors supported 48 people into employment, with
outreach support available in Letham, Blairgowrie and Rattray,
Kinross, Auchterarder, and Crieff. 
• We launched a monthly employability drop-in the Letham Hub,
working with DWP and Skills Development Scotland. Through
this partnership the Council will also continue to work in Letham
on a weekly basis providing ongoing multi-disciplinary drop-in
services including housing, Welfare Rights and CAB, supporting
the “No Wrong Door” approach to service provision in Letham.
• Through the Skills Passport project, 58 unemployed clients
gained training awards, with 21 now in work or self-employed.
• Our Youth Employability Team registered 140 new young people
and 122 completed support – 94% of whom moved into a
positive destination. Staff are based in every secondary school in
Perth and Kinross delivering one-to-one and group support, and
sector-based academies, and work closely with local employers.  
CASE STUDY 
Futures for All – Employer Recruitment Incentive
supported Wild Hearth Bakery in Highland Perthshire to
create a baking apprenticeship for a young person at risk of
becoming NEET*. With £8,000 funding, the business
provided meaningful training and development, resulting in
the apprentice progressing to the Real Living Wage within
six months. The scheme has had a transformative impact,
with plans to expand support for inclusive employment
opportunities across all age groups.
*Not in Education, Employment, or Training
Areas of Focus
• Unlock new investment in employment and housing land to
support business growth in foundational and key growth sectors.
• Make Perth and Kinross a more competitive inward investment
destination and encourage investment for growth from existing
businesses in foundational and key growth sectors 
• Unlock private investment and expertise to support public and
private energy projects.   
• Continue to grow visitor numbers for holidays and day trips
• Further enhance our employability tracking and outreach
capacity, supporting individuals in community settings.

Page 21

20
ANNUAL PERFORMANCE REPORT 2024/25
PKC - GENERAL 
➢ Perth & Kinross Economic Action Plan
➢ Perth & Kinross Tourism Strategy and Action Plan
➢ Perth & Kinross Culture Strategy 
Links to other Performance Information

Page 22

21
ANNUAL PERFORMANCE REPORT 2024/25
PKC - GENERAL
Key Performance Indicators related to this priority:
Data will be indicative of performance and should be considered in the context of the current operating environment and level of influence.
Key
Actions
(summary)
Indicator Control /
Influence
Performance
Comments
21/22 22/23 23/24 24/25 Annual
Change Target Met/Not
Met
Support
and
promote
business
growth and
investment 
Number of new
business start-ups
with support from
Business Gateway 
Influence 220 250 231 252

260  The number of business start-ups supported
by Business Gateway grew in 2024/25 and
shows level progress within the Tayside
Business Gateway LAs – slightly ahead of
Angus and just behind Dundee.
Area of available
Serviced
Employment Land
(Ha) 
Influence N/A (New Indicator) 17.57 26.15

35  This figure is based on the Employment Land
Audit 2025 (August 2025) and represents
employment land immediately available
across PK. There is an improved take-up of
2.7 ha per annum in the 3 years 2022-25
(compared to 2.1ha per annum in 8 years
prior to 2022). There is 269ha of land
constrained by minor factors including
physical, amenity and ownership constraints.
We are working with partners to make this
land immediately available. 
2024/25 saw 13 windfall planning permissions
for employment land on sites not allocated in
the Local Development Plan, and this
contributed to a strong uplift in the
immediately available land supply of over 9
hectares to 26.15 hectares.
Percentage of
premises
connected to
gigabit broadband 
Influence 40% 43% 46% 55%

50%    Gigabit-cable connectivity reached 55% of
premises, meeting our target. The recently
announced Scottish Government partnership
with GoFibre will connect 63,000 hard-to-
reach premises in Scotland, including areas
of Perth and Kinross – boosting future full
fibre coverage.

Page 23

22
ANNUAL PERFORMANCE REPORT 2024/25
PKC - GENERAL
Key
Actions
(summary)
Indicator Control /
Influence
Performance
Comments
21/22 22/23 23/24 24/25 Annual
Change Target Met/Not
Met
Number of
registered
businesses in
Creative Industries
(including digital)
Influence 380 350 335 355 
(As of
Dec
2024)

400  There are 355 registered creative industry
businesses, including digital as of
December 2024. This data is captured
annually towards the end of the calendar
year (Nov/Dec) to capture data for that
period. We are delivering projects to grow
this number, guided by the Culture Strategy
2023-2025. Perth's designation as the UK’s
first and only UNESCO City of Crafts and
Folk Art is raising our profile as hub for
makers, crafters and creatives looking to
start and grow their practice or business.
Invest in
innovative
green
power and
smart
technology
solutions
Renewable energy
generated across
the PKC estate,
including from low
carbon heat sources
(MWh)
Control 2,535 2,226 2,703 2,593 
Rolling 3%
continual
improvement 
While additional Heat Pumps were installed
in 24/25, low carbon heat consumption fell
due to operational issues with biomass
boilers at Strathearn and Breadalbane
community campuses. These sites are our
largest sources of low carbon heat
generation. Investigative works are ongoing
to find a resolution. Electricity generation
increased significantly thanks to new solar
panel installations. 
It is recommended that this KPI be split into
two: one to reflect generation of renewable
energy; and one to reflect low carbon heat
source technology. This will assist in
demonstrating more clearly how we are
performing in these linked, but discreetly
separate areas.

Page 24

23
ANNUAL PERFORMANCE REPORT 2024/25
PKC - GENERAL
Key
Actions
(summary)
Indicator Control /
Influence
Performance
Comments
21/22 22/23 23/24 24/25 Annual
Change Target Met/Not
Met
Number of
registered
businesses in
energy (including
renewables growth
sector)
Influence 140 145 140  145

154  There are 145 registered energy businesses,
including renewables growth. We’ve received
multiple enquiries from companies interested
in locating in Perth and Kinross, but land and
office accommodation constraints together
with other business specific factors have
limited uptake. Recently Business Waste
ranked Perth as the 5th most sustainable UK
city for businesses, and first for renewable
energy capacity per 100, 000 people.
Promote
what our
city and
towns have
to offer to
businesses,
investors
and tourists
Investment in
economic
development and
tourism (£ per 1,000
population)
Control £100,569 £91,711 £85,842 N/A
(avail
Dec 25)

N/A
(not  
appropriate
to set targets
as national
methodology
being
reviewed)
N/A  Data for 2024-2025 not available until
publication of LGBF. Information is based
upon most recent data published 
Total number of
visits (in person) to
libraries, museums,
and galleries 
Influence 246K 441K 484K 765K

617k     Visitor numbers rose significantly, driven by
the successful opening of Perth Museum. Q1
saw a 106,307 rise in footfall, with library
visits up 10.5%. Q2 saw a further increase of
200,952 visits, including a 12.8% rise in
library footfall and 6,898 visits to Perth Art
Gallery and Alyth Museum. Q3 continued to
exceed targets, with library visits up 7%,
despite a temporary reduction in mobile
library services. Libraries showing notable
improvement included Auchterarder,
Breadalbane, Scone, Loch Leven, and North
Inch. Q4 saw a 58% increase in overall
footfall (+280,586), including a 550% rise in
museum visits and a 36% increase at Perth
Art Gallery following the reopening of two
galleries.

Page 25

24
ANNUAL PERFORMANCE REPORT 2024/25
PKC - GENERAL
Key
Actions
(summary)
Indicator Control /
Influence
Performance
Comments
21/22 22/23 23/24 24/25 Annual
Change Target Met/Not
Met
Support
people into
work and
encourage
business to
access
initiatives to
create new
opportunitie
s 
Percentage of
unemployed people
assisted into work
from council
operated/funded
employability
programmes
Influence 15.7% 13.0% 13.7% 19.9%

15%  Notable improvement of +6.2% can, in part,
be attributed to increased engagement
through several key projects and
programmes. The Futures for Families
programme engaged 199 new families in
24/25. 45 of these clients have moved into
new self-employment opportunities with our
support. This, being a new initiative,
enhances the already existing suite of
options. 
A greater focus on new job creation saw
significant investment from PKC and Scottish
Government of £343k. This funding created
48 new jobs, 22 of which were Modern
Apprentices in micro and small businesses
locally. 
In addition, we have supported 233 people
into accredited training and qualifications. 
246 people with a disability were supported
into a positive destination.
Number of adult
learners achieving
outcomes 
Influence 279 780 901 618  300    A total of 618 adult learners achieved
outcomes across a range of programmes:
• 132 achieved Level 2 Food Hygiene.
• 159 learners completed digital skills
courses.
• 169 improved English skills through
ESOL classes.
• 43 achieved SQA qualifications at level 2,
3 or 4 in Numeracy, Communications or
ICT.
• 40 improved core literacy and numeracy.
• 75 completed ASDAN short courses.

Page 26

25
ANNUAL PERFORMANCE REPORT 2024/25
PKC - GENERAL
Key
Actions
(summary)
Indicator Control /
Influence
Performance
Comments
21/22 22/23 23/24 24/25 Annual
Change Target Met/Not
Met
Lower figures in some areas reflect reduced
demand following earlier surges, - e.g.
ESOL enrolments linked to the Ukraine war
and Food and Hygiene training for
volunteers during and post COVID.

Page 27

26
ANNUAL PERFORMANCE REPORT 2024/25 
PKC - GENERAL
Priority: Enabling our children and
young people to achieve their full
potential 
The PKC Raising Attainment Strategy 2024-2027 sets out a
shared vision, priorities, and expectations in relation to raising
attainment and achievement for every child and young person. This
strategy reflects the national ambitions of attaining excellence and
achieving equity. Progress is reported in the annual Education
Improvement Plan, presented at the Learning and Families
Committee 27 August 2025. 
Overall, schools and Early Learning and Childcare (ELC) settings in
PKC perform well and deliver high quality education as evidenced
through internal and external scrutiny, review and inspection
detailed below. Children and young people experience a curriculum
which considers equity and excellence with work ongoing to ensure
due consideration to the Cost of the School Day. 
Action: Ensure inclusive and quality education for
all and promote lifelong learning 
By using data effectively and focusing on equity, our schools and
early years settings are driving meaningful improvements and
helping children and young people reach their full potential. Key
activities contributing to this in 2024/25 include: 
• We strengthened the use of data in school improvement
planning. The majority of schools now include actions to reduce
the Cost of the School Day in their Quality Improvement Plans
for 2025/26 – ensuring equity is embedded in everyday
decision-making.
• Our Early Learning and Childcare settings outperformed both
national and comparator benchmarks in all Care Inspectorate
Quality Indicators, reflecting the consistently high standards
across Perth and Kinross.   
• Education Scotland inspected one secondary and seven
primary schools. Of the primary reports published in 2024/25
(two reports were for inspections undertaken in 2023/24), one
was graded “Very Good”, 16 “Good” and five “Satisfactory”. The
secondary school received one “Good” and one “Very Good”
88% 90% 88% 84% 88%
74% 76% 74%
66%
73%77% 80% 78% 72% 77%
0%
20%
40%
60%
80%
100%
Care, Play and
Learning
Setting Staff Team Leadership All QIs
How good is our ...
Quality Indicator (QIs) -Good or better (%)
Perth & Kinross Council Comparator Authorities National

Page 28

27
ANNUAL PERFORMANCE REPORT 2024/25 
PKC - GENERAL
grading, with strengths in leadership, attainment and partnership
working. Schools have put in place action plans to address
identified improvements, supported by our Quality Improvement
Team. Common improvement themes identified in the
inspection reports included consistency in learning, teaching
and assessment, and better use of data to plan interventions.
These are being addressed through:
• individual action plans at school level
• service-wide initiatives including the introduction of
Principal Teachers of Learning and Teaching, funded by
Strategic Equity Funding
• universal, tailored or intensive support to schools and
ELC settings to improve approaches to learning and
teaching and the use of our Learning and Teaching
Framework. 
• A National Thematic Inspection by His Majesty’s Chief Inspector
of Education reviewed how local authorities support schools to
improve. The visit to Perth and Kinross found our advice and
guidance to be clear and comprehensive, with strong
expectations set around standards and planning. Our
responsive, risk-based approach to providing support and
challenge to schools along with formal Quality Improvement
Reviews were highlighted as good practice.
• Quality Improvement identified key strengths and areas for
development, which correlate with the findings of Education
Scotland Inspections. These include key strengths such as: 
• positive climate and ethos in schools 
• effective use of data for improvement 
• targeted use of Pupil Equity Funding (PEF) to close the
poverty-related attainment gap
• impactful local authority-led programmes, including the
National Improving Writing programme and Numeracy
Schools initiative  
Areas for development included:
• strategic approaches to self-evaluation and involving
children, young people and their families
• assessment and moderation practices
• consistency in learning and teaching expectations 
CASE STUDY
By utilising Nurturing approaches, which recognise that
positive relationships are central to learning, wellbeing and
resilience, Riverside Primary School delivered training and a
programme of activities to develop positive self-esteem
among children and young people, with involvement from
families and carers. 
• We made strong progress across all Additional Support Needs
(ASN) Transformation Programme workstreams, including:
support staff; professional learning; inclusive environments;
intensive support; transitions; speech and language therapy;
and data-informed decision-making. Examples include: 
• Extensive options appraisals and statutory consultation
processes were undertaken, involving a range of
stakeholders, on proposals to develop three new
Intensive Support Provisions (ISPs). These will open
(temporarily pending formal approval in January 2026) in
August 2025 providing intensive level learning and
support for a greater number of children and young
people within their own catchments.
• A new support staff allocation model to better match
staffing to identified learner needs.

Page 29

28
ANNUAL PERFORMANCE REPORT 2024/25 
PKC - GENERAL
• New data tools are helping school staff and central
officers to record pupils needs accurately and ensure the
right support is in place. 
• A revised Speech and Language Therapy contract now
includes a defined ‘core offer’ and annual review
process, allowing us to tailor priorities based on
emerging needs.
• Career Progression Pathway models for staff supporting
learners with ASN are being mapped to statutory duties
and staged levels of interventions, ensuring children are
supported by trained and skilled staff. 
• 45 schools and 3 ELC settings now hold a Digital Schools
Award, an increase of over 50% on 2023/24. Every school now
has a named Digital Champion. Perth and Kinross had the
second highest number of schools gaining Digital Schools
Awards during 2024/25.
• Schools are implementing the United Nations Convention on the
Rights of the Child (UNCRC) Act 2024 supported by published
guidance and shared examples of good practice.
• The Rights Respecting School Award (RRSA) programme is
active in many schools, with currently 16 holding the Silver
Award accreditation, and 14 holding the Gold Award. 
CASE STUDY
Over the course of 2024/25 Crieff Primary School has been
working with Education Scotland, Children and Young
People Improvement Collaborative (CYPIC) and PKC central
officers on a pilot project to support practitioners to improve
learning, teaching and assessment of Numeracy. 
Action: Reduce the poverty-related attainment gap
By tracking progress over time and targeting support where it’s
needed most, we’re helping more children and young people
achieve their potential—regardless of background. Key activities
contributing to this in 2024/25 include:
• We’ve seen steady improvement in literacy attainment across
P1, P4 and P7. The gap between the most and least deprived
cohorts narrowed from 27% in 2020/21 to 21% in 2023/24.
• Numeracy attainment has improved in both cohorts, but at a
slower rate for SIMD Q1 than for Q5. As a result, the poverty-
related attainment gap widened slightly in 2023/24. However,
the long-term trend still shows progress, with the gap narrowing
from 24% in 2020/21 to 22% in 2023/24. 
• Senior phase leaver data shows significant progress:
• the gap between SIMD Q1 and SIMD Q5 in achieving at
least one Level 6 qualification reduced from 40% in
2021/22 to 28% in 2023/24
• the gap for leaving with at least one Level 5 qualification
narrowed from 28% to 19% over the same period. 
Action: Ensure that Looked After children and
children and young people with additional support
needs achieve health, wellbeing and education
outcomes comparable with their peers 
Through targeted support, partnership working, and a refreshed
policy framework, we’re improving outcomes in education, health
and wellbeing. Key activities contributing to this in 2024/25 include:

Page 30

29
ANNUAL PERFORMANCE REPORT 2024/25 
PKC - GENERAL
• Our new Corporate Parenting Plan 2025-30 sets out clear
priorities to support Looked After Children to achieve their full
potential. Progress is monitored by the Corporate Parenting sub-
group of the Children, Young People and Families Partnership.
• The Care Experience Children and Young People Fund enabled
the recruitment of two additional youth workers, ensuring every
secondary school has a dedicated contact/support youth worker
for care-experienced pupils, strengthening relationships and
support.
• In 2023/24, 60% (12 out of 20) of Looked After young people
attained at least one SCQF Level 4 qualification, below the
national average of 72%, and attainment remains below that of
all school leavers. Care should be taken when comparing these
figures across years and cohorts due to the small numbers
involved. A sub-group of the Raising Attainment Board has been
established to focus on further improvements. Actions include:
• Appointment of a Promise Improvement Lead
(Education) to support attendance and raising attainment
for all care experienced children and young people and
young carers.
• Delivery of refreshed guidance and training for school
staff to ensure consistency of practice.
• A Services for Young People project is being developed to
improve attendance for care-experienced young people
providing a tailored support to tackle the barriers to
attendance.  This will be part-funded through the Care
Experience Children and Young People Fund. 
• The Staged Intervention Framework was implemented across
Early Learning and Childcare settings and schools, offering a
clear structure to support learners who face barriers. In
September 2024, 39% of pupils (6,973) were identified as facing
barriers - up from 35% in 2022/23.
• The Staged Intervention Model promotes early intervention
through a four-level framework, involving the child or young
person, their parents or carers, school staff and, where relevant,
other professionals, in developing a Child’s Plan. Annual audits
will monitor implementation and consistency.
• Schools are using a range of initiatives to support care-
experienced learners, including: 
• one-to-one tutoring from the Volunteer Tutors
Organisation (40 pupils supported, 14 of these showed
improved attendance)
• mentoring through MCR Pathways
• Learning Hubs at Riverside and Letham Primary Schools
• Champions Boards in every secondary school,
supported by Youth Services 
• Attendance for children and young people who are looked after
at home has fallen in the last academic session, from 77% in
2023/24 to 53% in 2024/25. The largest fall was for young
people in S2 and S3 in secondary school, although these
numbers need to be treated with caution as these are usually
very small cohorts of pupils (33 pupils with attendance under
90%). Reviewing Officers and the Promise Improvement Lead
(Education) are working in close partnership to ensure barriers to
attendance and participation in learning are identified and joint
planning is in place.
• Outcomes for our care-experienced learners are improving, with
higher attainment in literacy and numeracy. More care
experienced young people are entering positive destinations on
leaving school (up from 82% in 2022/23 to 95% in 2023/24),
although gaps remain compared to their peers.  Changes in this
area need to be judged carefully as they refer to very small
cohorts of young people, often less than 20 per year.
• Fairview School won a national award for its work to promote
inclusion and celebration of ASN learners.

Page 31

30
ANNUAL PERFORMANCE REPORT 2024/25 
PKC - GENERAL 
CASE STUDY
Funding from the Scottish Attainment Challenge’s Care-
experienced Children and Young People fund has enabled the
facilitation of Learning Hubs in Riverside and Letham Primary
Schools to provide additional support for care-experienced
children and young people to achieve their potential. 
Areas of Focus
• Attainment at key milestones is raised for all children and young
people.
• Attendance rates improve, particularly in the secondary sector.  
• Increase the number of young people going into positive
destinations such as work experience, further education,
volunteering and employment.
• Improved understanding of causes of attainment gap so that
effective interventions can be identified and implemented.
• Improve support to children and young people with additional
support needs to realise their full potential.
• Provide Kinship Carers with a range of supports to enable them
to meet the needs of children in their care. 
Links to other Performance Information
➢ Raising Attainment Update 2023/24 (Item 9)
➢ Corporate Parenting Plan 2025-2030 (Item 7)

Page 32

31
ANNUAL PERFORMANCE REPORT 2024/25 
PKC - GENERAL
Key Performance Indicators related to this priority:
Data will be indicative of performance and should be considered in the context of the current operating environment and level of influence.
*Attainment indicator data will not be published until February 2026; therefore, change relate to the most recent year of publication. 
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24 Annual
Change Target
Target
Met/
Not Met
Ensure
inclusive and
quality
education for
all and
promote
lifelong
learning 
Percentage of
children meeting
expected
developmental
milestones when
entering primary
school 
Influence 82.0% 81.7% 80.6% 75.6%  81%  In 2023/24, 75.6% of P1 children met all expected
developmental milestones – a decrease likely to be linked to
the cohort being born in during the COVID-19 pandemic,
when early supports were not available to families. Public
Health Scotland confirms a national increase in
developmental concerns at age 4-5 reviews. Additionally, the
percentage of additional support needs (ASN) within this
cohort is slightly higher. Of those, 68% did not meet all
milestones, up from 44% last year. This cohort also includes
a higher proportion of boys (54% this year compared to 49%
last year), and research tells us that boys typically make
slower progress at this stage of development. Within this
cohort more children are recorded as not having achieved
one developmental milestone, rising from 267 last year to
298 this year. Particular issues are attention, emotional,
social and speech and language which all show an increase
of 3%. Through the embedded work of the Communication
and Wellbeing Champions who plan and model daily high-
quality play and learning experiences, there is a focus on
early intervention to support development. ELC settings
continue to focus on high-quality provision, outdoor learning,
and emotional resilience to address developmental concerns
and support children’s progress.
Percentage of
primary school
pupils (P1, P4 &
P7 combined)
achieving
expected levels
Control 74% 77% 78% 80%

79%      There has been a steady upward trend in this measure over
time from 74% in 2020/21 to 80% in 2023/24. This compares
favourably with the Scottish average of 81%. Literacy
attainment gaps between the most and least deprived pupils
have narrowed from 27% in 2020/21 to 21% in 2023/24. In
numeracy, although both SIMD Q5 and SIMD Q1 have

Page 33

32
ANNUAL PERFORMANCE REPORT 2024/25 
PKC - GENERAL
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24 Annual
Change Target
Target
Met/
Not Met 
Ensure
inclusive and
quality
education for
all and
promote
lifelong
learning 
in literacy and
numeracy
improved, the gap has widened due to faster progress among
the least deprived cohort. The Education Improvement Plan
for 2025/26 prioritises numeracy, with targeted support for
schools where numeracy attainment is below 70% or where
gaps persist. This includes rollout of the pilot Improving
Numeracy Project, completed in one setting in 2024/25.
Proportion of
school leavers
attaining 1 or
more passes at
SCQF Level 5 
Control 89% 89% 90% 88%  91%  Leaver attainment at Level 5 declined slightly in 2023/24 but
remains above the national average (83.5%). Attainment at
Level 6 has remained stable, outperforming the national
trend, which has steadily declined to 57.4% over the last
three years. This may reflect the return to full course
assessment for the first time since 2019. There has been a
focus on a data driven senior phase curriculum to ensure that
there is breadth, progression, depth, personalisation and
choice available in the senior phase. This includes the
development of Foundation Apprenticeships and a focus on
developing qualifications in partnership with employers and
industry.
Proportion of
school leavers
attaining 1 or
more passes at
SCQF Level 6 
Control 71% 66% 66% 66%

67% 
Participation of
16–19-year-olds
participating in
learning, training
or work (%)
Influence 94% 94% 93% 93%

93%    There have been changes to how this data set has been
collated. HM Revenue & Customs (HMRC) data was included
within the data set (for the first time) in 2023 but was
removed from the 2024 APM data set. To ensure
comparability across publications, the 2023 data set has
been revised to allow for comparisons between different
years to be made on a like for like basis.  This change has
been reflected in the data recorded here.
This measure is influenced by a range of other partners
including Skills Development Scotland and UHI Perth. Our
teams are working closely with them to ensure that young
people achieve sustained positive destinations.

Page 34

33
ANNUAL PERFORMANCE REPORT 2024/25 
PKC - GENERAL
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24 Annual
Change Target
Target
Met/
Not Met
Reduce the
poverty-
related
attainment
gap
Percentage gap
between SIMD 1
and SIMD 5 for
school leavers
attaining 1 or
more passes at
SCQF Level 5
Control 28% 24% 17% 19%  24%    The coronavirus pandemic (COVID-19) led to changes in
how National Qualifications were assessed and graded, and
this will have had an impact on the attainment of school
leavers in 2019/20, 2020/21, 2021/22 and 2022/23. 2023/24
data demonstrates that the poverty related attainment gap at
Level 5 has maintained a steady downward trend from 28%
in 2020/21 to 19% in 2023/24, and at Level 6 has reduced
from 41% in 2020/21 to 28% in 2023/24 with year-on-year
reductions. This compares favourably with the national
picture where the gap was 22.7% at Level 5 in 2023/24;
wider than in 2022/23 (20.2%). At Level 6 this also compares
favourably with the national picture where the gap was 38.4%
in 2023/24; wider than in 2022/23 (36.9%).
Percentage gap
between SIMD 1
and SIMD 5 for
school leavers
attaining 1 or
more passes at
SCQF Level 6
Control 41% 35% 29% 28%  34%   
Ensure that
Looked After
Children and
children and
young people
with
additional
support
needs
achieve
comparable
outcomes
Percentage of
children being
looked after in
community
placements
rather than
residential
placements –
balance of care 
Control 96% 94% 94% 95%
(as at 31st
July
2024)

N/A
(Target
not set) 
N/A Data for 2024-2025 not available until publication of
LGBF. Information is based upon most recent data
published. 
In 2023/24 there were 248 Looked After Children, with 95%
looked after in the community – above the national figure of
89%. The overall number of children who are looked after
has continued to decrease, however the population is
changing. More are now looked after at home, looked after
but living independently, or are in kinship arrangements. This
reflects the success of early intervention projects and Family
Group Decision Making (FGDM), helping families support
each other and keep children within their birth families. 
Percentage of
school leavers
looked after
within the last
Control 62% 87% 87% 60%  72%  We recognise that this group is a key priority for improved
attainment. We have recently appointed a Promise
Implementation Lead (Education) to track the educational

Page 35

34
ANNUAL PERFORMANCE REPORT 2024/25 
PKC - GENERAL
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
20/21 21/22 22/23 23/24 Annual
Change Target
Target
Met/
Not Met
year with 1 or
more
qualification at
SCQF level 4 
journeys of all school aged looked after children and young
people. 
Note: Care should be taking when comparing these figures
across years and cohorts due to the small numbers involved.
The drop in performance from 2022/23 to 2023/24 amounted
to a change in actual numbers of only 1.

Page 36

35 
PKC - GENERAL
Priority: Protecting and caring for our
most vulnerable people 
Under the Social Work (Scotland) Act 1968, as amended by the
Local Government (Scotland) Act 1994, Scottish local authorities
hold statutory responsibility for delivering social work services.
Children, Families and Justice Social Work are delivered by the
Council, whereas Adult Social Work and Social Care services are
delivered through the Perth and Kinross Health and Social Care
Partnership (HSCP), under the governance of the Integration Joint
Board (IJB). The IJB Annual Performance Report 2024-2025
outlines progress against the strategic ambitions set out in the IJB’s
Strategic Plan 2024-2027. 
This section draws on key highlights and performance information
from both services delivered by the council and those delegated to
the IJB to protect and care for our most vulnerable people. 
Action: Ensure we quickly identify children, young
people and adults at risk of harm and abuse and
take the necessary actions to keep them safe 
Through strong multi-agency working, trauma-informed practice,
and continuous improvement, we act quickly to identify risk and
provide the right support at the right time. Key activities contributing
to this in 2024/25 include: 
• In 2024/25 8,832 referrals were made to the Child Protection
Duty Team – an increase of 9% from the previous year. This
appears to be stabilising after increasing year on year post
COVID-19. All referrals are triaged within 24 hours, with
immediate action taken. Where significant child protection
concerns are identified, we include Inter-Agency Referral
Discussions (IRDs) or support via the Multi-Agency Screening
Hub (MASH).
• The Scottish Child Interview Model (SCIM), introduced across
Tayside in May 2024, is now well imbedded in child protection
processes. This trauma-informed approach was used in 85% of
all interviews in 2024/25, ensuring children have the best
possible opportunity to tell their story. Cross-boundary working
with trained staff has strengthened consistency and access.
• MASH continues to provide early help to families in need,
bringing together statutory and third-sector partners to share
information and direct families to the most appropriate support
as soon as possible.
• The Child Protection Committee (CPC) launched its updated
CPC Improvement Plan 2025 to 2028, supported by a new
strategy and schedule to guide self-evaluation activities. Audits
led by the Child Protection Interagency Coordinator highlighted
strong practices in relationship-based practice and rapid
responses to risk. Areas for improvement include enhancing
child and young people’s plans and better incorporation of their
views into decision-making.
• CPC Community of Practice events focused on professional
curiosity and managing professional differences. These
sessions were well attended and positively evaluated, helping to
refresh CPC guidance and support continuous service
improvement.
• In adult protection, complex cases are managed through a
multi-agency approach under the Adult Support and Protection
(ASP) Act. Referral analysis led to new triage pathways for
adults at risk due to addiction or mental health issues,
supporting earlier intervention.
• The ASP assessment framework was updated to focus on the
quality of outcomes for adults and unpaid carers. The ASP
workforce supports people in both urban and rural areas. Joint
work between adult and child protection committees is

Page 37

36 
PKC - GENERAL
underway in Letham to better understand community views on
public protection.
• Reporting harm is actively encouraged. Although we see a
levelling in the total number of Adult Protection (AP) referrals, it
must be noted that the national ASP data that is made available,
data for 2024/2025 demonstrates that Perth and Kinross
receives more Vulnerable Person Reports (VPR) per head of
population and third highest in Scotland for the total number of
all AP referrals received. 
• The ASP Co-ordinator audits the AP concerns and VPRs that
are not screened within 24-hours (50 out of 3,147). Whilst the
majority of these that were not screened within 24-hours were
screened within 48-hours, the audit found that no adult was left
at any undue harm as a consequence of this delay. 
• Interagency Referral Discussions (IRDs) facilitate the multi-
agency sharing of information to determine how to safeguard
and adult at risk of harm. The process for IRDs in Perth and
Kinross has been found by the Care Inspectorate to be a good
example of services providing an early multi-agency response to
harm. 
CASE STUDY
This case study highlights the benefits of using the Safe and
Together approach – a relationship-based approach with
family to safely return children to their mother’s care.  This
approach involved engagement with parents and family
members ensuring children’s needs remained central. 
Action: Ensure that people get the right care,
accommodation and support where and when they
need it 
We’re focused on making sure people of all ages receive the right
care, support and housing at the right time. Whether through health
and social care, family-based support, or access to safe and
sustainable homes, our work aims to meet individual needs and
improve outcomes across Perth and Kinross. Key activities
contributing to this in 2024/25 include: 
• 64% of people with intensive care needs received ‘care at
home’, maintaining strong performance in line with the Scottish
average of 65%. This reflects our continued commitment to
helping people remain safely at home for as long as they wish to
do so.
• 97.6% of adults were discharged from hospital without delay,
consistently meeting the national target of fewer than 34.6 per
100,000 adults. This was supported by a number of
interventions which have reduced unmet care needs by around
800 hours since August 2024
• A new alliance contract with 15 care at home providers,
increasing care hours from 6,302 to 8,073. 
• Care at Home providers now using the PinPoint mapping tool to
better organise support provision. 
• Restructuring HART and HART+ teams to enable more
personalised and timely discharges, supporting 256 people (up
from 230) and increasing care hours from 1,450 to 1,847. HART
and HART+ is the Council’s internal care at home and
reablement service.

Page 38

37 
PKC - GENERAL
• During 2024/25 funded permanent placements to care homes
due to unpaid carer breakdown and/or crisis decreased from
17.5% in 2023/24 to 7%. This indicates early intervention and
prevention within the community for both the unpaid carer and
cared for remains critical. 
• Recruitment of host families for our unaccompanied asylum-
seeking children (UASC) has slowed despite targeted
recruitment campaigns. Alternative accommodation options are
being considered to ensure safe placements continue. 
• Foster carer recruitment remains challenging, but we’ve reduced
the number of children placed with independent fostering
agencies from 22 in 2023/24 to 16 in 2024/25, with two more
transitions planned in 2025/26. 
• At the end of March 2025, 13 young people were in residential
accommodation, with plans for three to leave in 2025/26. Active
care planning is in place to support alternative family-based care
options including: family group decision making; kinship care;
support for families out of hours; and therapeutic supports from
speech and language therapy and psychology. Notwithstanding,
there is likely to be a continued need for residential
accommodation for children during 2025/26.
• A Youth Housing Panel was established to support care-
experienced young people who are moving into independent
living. Meeting monthly, the panel matches individuals to suitable
accommodation based on skills and needs, working with
partners including ROCK Trust and YMCA. Around 10 care
leavers are expected to benefit annually, with consideration of
extending this to other young people with complex needs.
• As a council of sanctuary, we continue to support reducing
demand for resettlement activity and people seeking asylum
placed here by the home office. Some individuals who have
been granted refugee or humanitarian protection status may
choose to make homelessness applications in Perth and Kinross
• In response to the National Housing Emergency, we reduced
average re-let times from 37.8 days in 2023/24 to 24.87 days in
2024/25 and cut the number of void properties from 136 to 95.
Improvements were achieved by deferring non-essential
upgrades, simplifying compliance checks, and offering flexible
decoration options – despite national challenges such as skilled
labour shortages, rising material costs, and delays in utility
connections. 
• To maintain progress, we introduced bulk material purchasing,
launched recruitment initiatives, hired six modern apprentices,
and partnered with Energy Angels to address utility delays -
ensuring homes are delivered quickly and sustainably
• A dedicated Housing Condition Team was established to tackle
condensation, mould, and damp (CMD) in response to Awaab’s
Law and new Scottish Housing Regulator indicators. We
expanded our Housing Internet of Things (IoT) project by
installing air quality sensors in over 440 homes to monitor
temperature, humidity, and CO₂ levels in real time. This supports
early identification of issues and encourages tenants to report
problems at the right time, with staff training and tenant
engagement helping to improve outcomes. 
CASE STUDY
Youth Housing Support Group brings together providers of
housing support with key teams in Housing and Children’s
services.  Support provided matches young people with more
appropriate accommodation.

Page 39

38 
PKC - GENERAL
Action: Prepare for the establishment of the
National Care Service and continue to strive for
excellent health and social care outcomes for the
people of Perth and Kinross 
The Scottish Government has revised its approach and through the
Care Reform (Scotland Bill) will retain key policy commitments such
as Anne’s Law, the establishment of a National Social Work Agency
and improved support for unpaid carers, while no longer pursuing
the transfer of adult social care responsibilities from local
authorities.
Action: Work with partners to reduce re-offending
and support effective interventions for people in the
justice system 
Through trauma-informed practice, coordinated release planning,
and community-based interventions we are working together to help
individuals rebuild their lives and to reduce the impact of offending
on families and communities.
We trialled the trauma informed group work programme Connectere
within our men’s service. Following positive feedback from the first
group (six completions), eight staff were trained to deliver the
programme inhouse. Two further cohorts were completed in 2024
with eight participants and positive feedback on impact and group
progress. 
“I enjoyed finally getting help for issues that have been
lifelong. Also finding out that I am not alone in my issues.”
– Connectere participant
“The most beneficial session was the session on self-
compassion. I don’t think I would have improved without it,
I think it is something everyone should learn.” –
Connectere participant
• A small test of change to improve co-ordinated support to Perth
and Kinross residents leaving prison on short-term releases was
expanded from two prisons to any Scottish prison in June 2024.
The approach brings together partners from several teams and
agencies to discuss individual support needs and provide an
effective offer of support to people leaving prison. A total of 47
people (40 males and 7 females) were considered during
2024/25 and 32 (68%) signed up for the support offered. 
This work will be expanded further in 2025-26 bringing all
releases into the co-ordination meeting (Short-term Sentence,
Long-term Sentence and Remand). A Young Person’s Steering
Group was established at Perth Academy, involving seven young
people affected by family contact with the justice system.
Supported by Families Outside, the group helped develop youth-
focused resources for the Child Impact Assessment project. In
early 2025, the group evolved into a peer support model, offering
fun and meaningful activities and some respite from the school
environment. Learning from this group support expanding this
model into other schools. 
• Our Community Justice Service (CJS) took part in a Care
Inspectorate self-evaluation activity focused on measuring and
reporting performance, quality and outcomes for people on
community-based sentences. Perth and Kinross was one of the
areas which received onsite. Strengths included a
demonstratable capacity for improvement as evidenced by
numerous focussed Strategic Needs and Strengths Assessment
and work to align activity to the National Strategy for Community
Justice.  Areas for development included development of a
Performance Framework and Dashboard and a Quality
Assurance Framework.

Page 40

39 
PKC - GENERAL
• Hillcrest Futures employed a peer worker at HMP Perth to
deliver harm reduction and recovery activities. There are 321
groups providing activities with 2,658 attendances, and 301
received one-to-one support. This work is delivered in
partnership with the Scottish Prison Service.   
CASE STUDY
Child Impact Assessment Project supports children and
young people with a parent in contact with the justice system
to be seen, heard and supported through the provision of
widespread training for professionals and raising awareness of
the Child Impact Assessment Toolkit.
Areas of Focus
• Take a partnership approach to the assessment of risk of
significant harm to a child and minimising and reducing risk
through early support and assessment.
• Enhance our housing support offer by implementing an
Intensive Housing Support Service for people with complex
needs.
• Where children cannot remain living at home, every effort is
made to keep them within their kin network. 
• Maintain significant relationships for care experienced children
to deliver on the principles of The Promise. 
Links to other Performance Information
➢ IJB Annual Performance Report 2024/2025

Page 41

40 
PKC - GENERAL
Key Performance Indicators related to this priority:
Data will be indicative of performance and should be considered in the context of the current operating environment and level of influence.
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
21/22 22/23 23/24 24/25  Annual
Change
Target
Met/Not
Met
Target
Ensure we
quickly
identify
children,
young
people and
adults at
risk of harm
and abuse
and take the
necessary
actions to
keep them
safe.
(Children
and young
people) 
Percentage of
children on
child protection
register over 12
months 
Control 8% 4% 6% N/A

N/A
(not
appropriate
to set
targets) 
N/A Most child protection registrations last less than a year,
with registrations of 12 months or more remaining low.
This follows a peak of 28% in 2020/21 linked to the
impact of COVID-19. Children and young people who
remain on the register longer often have multiple and/or
complex needs requiring coordinated support.
Registrations now follow the revised National Child
Protection Guidance (2021, revised 2023), with
minimum duration of six months. 
Note:  Children are removed from the register when
risks have been mitigated and there has been an
improvement in relation to the circumstances that led to
them being registered in the first place. 
Rate of children
on the child
protection
register per
10,000 children 
Control 21 20 19  N/A
N/A
(not
appropriate
to set
targets) 
N/A Data for 2024-2025 not available until publication of
LGBF. Information is based upon most recent data
published 
23/24 Scottish Average is 23.8 
Calculated using 2022 Mid-Year Estimates (MYE)
Population (0-15) figures until updated figures are
published, in line with national approach. Child
Protection registrations in Perth and Kinross remain in
line with the national average rate (from 2022) of 20 per
10,000 population. This reduction reflects significant
investment in consistent chairing of case conferences
and earlier use of Child and Young Person’s Plans,
helping reduce the need for case conference and
registration by working collaboratively with families.

Page 42

41 
PKC - GENERAL
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
21/22 22/23 23/24 24/25  Annual
Change
Target
Met/Not
Met
Target
Ensure we
quickly
identify
children,
young
people and
adults at
risk of harm
and abuse
and take the
necessary
actions to
keep them
safe.
(Adults) 
Number of
Vulnerable
Person Reports
received 
Influence 1,755 2,254 2,262 2,255
N/A
(not
appropriate
to set
targets) 
N/A In 2024/25, 2,255 Vulnerable Person Reports (VPRs)
were received – consistent with recent years. The Adult
Protection Committee encourages reporting where
concerns exist, enabling timely intervention. Although
we are seeing a levelling in the VPRs received, national
data shows Perth and Kinross receives more VPRs per
head of population than any other area in Scotland.
This is likely due to strong partnership arrangements
around this area of work.
Percentage of
Adult Support
and Protection
(ASP) Initial
Referral
Discussions
held within
timescale
Control 67% 69% 75% 86%
100%  86% of Adult Initial Referral Discussions (IRDs) were
held within five days of the decision to proceed. Routine
auditing of IRDs ensures timely safeguarding and
accountability and confirm that where IRDs took place
outwith the target of 5 days no adult was left at undue
risk. 
Ensure that
people get
the right
care and
support
where and
when they
need it.
Number of
households
presenting as
homeless 
Influence 610 737 849 861  N/A
(not
appropriate
to set
targets) 
N/A Homelessness presentations increased slightly by 1.4%
in 2024/25. Despite this, our commitment to the ‘Home
First’ approach remains strong. Focused on prevention,
rapid rehousing, and tenancy sustainment, this model
continues to deliver sector-leading outcomes and
person-centred support.
Percentage of
affordable
homes built to
wheelchair and
adaptable
standard (units) 
Control 4.3% 8.9% 10% 11%

10% 
of all
social
housing
built   
Of the 107 affordable homes built in 2024/25, 12 were
adapted properties suitable to meet the needs of older
or ambulant disabled households, including one being
suitable for wheelchair use.

Page 43

42 
PKC - GENERAL 
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
21/22 22/23 23/24 24/25  Annual
Change
Target
Met/Not
Met
Target
Percentage of
adults receiving
any care or
support who
rate it as
excellent or
good 
Influence 77% 73% 70% N/A
(HACE
data
available
25-26)
N/A N/A
(Target
not set)
N/A HSCP no longer uses the Service User Experience
Survey (SUPE). Future reporting will draw on the
Health and Care Experience (HACE) survey data,
available next year. 
As the HSCP implements the newly approved IJB
Performance Framework new measures and targets will
be established to supplement the 2 yearly publication of
HACE data.  Percentage of
adults
supported at
home who
agree that their
services and
support had an
impact in
improving or
maintaining
their quality of
life. 
Influence 76% N/A 76% N/A
(HACE
data
available
25-26)
N/A N/A
(Target
not set)
N/A

Page 44

43 
PKC - GENERAL
Priority: Supporting and promoting
physical and mental wellbeing 
Adult Social Work and Social Care services are delivered through
the Perth and Kinross Health and Social Care Partnership (HSCP),
under the governance of the Integration Joint Board (IJB). The IJB’s
Annual Performance Report 2024-2025 outlines  progress against
the strategic ambitions set out in the IJB’s Strategic Plan 2024-
2027. This section draws on key highlights from the report,
alongside performance information from Council services which are
not delegated to the IJB. 
Action: Work with partners to provide localised
health and social care provision in areas of greatest
need and in those most geographically distant from
services 
By focusing on person-centred services, inclusive activities, and
community-led initiatives, we’re helping people live healthier, more
independent lives closer to home. Key activities contributing to this
in 2024/25 include:
• The Learning Disability and Autism Strategy 2022-2025
continues to drive person-centred support, with progress
reported to the IJB in June 2025.  
• The Scope Team was established in May 2022 and now
supports 367 people which is an 8% increase since March 2024, 
has successfully prevented hospital admissions and assisted
people to return from long-stay hospital care to their community,
in line with the ‘Coming Home’ ambitions. The SCOPE team has
continued to deliver support which is sustaining individuals in
their own homes, reducing the need for admission into hospital
or care provision. There have been no admissions into long stay
hospital in the last 12 months.
• Additionally, the team also provides valuable assistance to
carers of people with complex needs. A new peer support group
for carers has attracted 15 participants, strengthening informal
networks and wellbeing. 
• The ‘Check In Giraffe’ programme delivered over 6,000 hours of
work experience and 3,500 hours of additional support through
301 sessions and 67 different activities – helping people
overcome barriers to employment. 
• Promoting a More Inclusive Society (PAMIS) supported 46
registered families and reached many more through inclusive
community events. In 2024, the team responded to 219
enquiries, held 100 online meetings, and hosted 50 in-person
events. Two digital passports were developed to improve
person-led communication. 
• Stanley Development Trust provided weekly soup and sandwich
clubs to reduce isolation among older residents. In 2024, there
were 496 attendances at the Lunch Club and 280 at Soup Club.
“I have always felt included and valued at Giraffe. People play
different roles in the organisation, but there is no hierarchy of
importance. No one person is more important than another.” –
Check In Giraffe participant

Page 45

44 
PKC - GENERAL
“PAMIS staff consistently go above and beyond to support our
family.”  “PAMIS are always such a great support to me.” –
PAMIS registered users
“Soup and lunch clubs are great value for money and a good
social occasion for older people.” – Stanley Development Trust
feedback
Action: Improve health and wellbeing in Perth and
Kinross by increasing overall participation in sport
and physical activity and promoting the wellbeing
benefits of time spent in our natural surroundings 
Through inclusive programmes, community-led initiatives, and
investment in green spaces, we’re helping people of all ages stay
active, connected, and well. Key activities contributing to this in
2024/25 include:
• We supported Live Active Leisure staff to deliver evidence-based
falls prevention classes. These classes are based on later life
training, postural stability instructor training, and have been
shown to be highly effective in reducing falls among community
dwelling older adults. Over 2,000 Wellbeing Community Classes
were delivered, supporting more than 20,000 individual
attendances. Activities included chair-based social classes,
social circuits, aqua circuits/aerobics, and chair-based yoga.
• The risk of falls increases with age and given the growing older
population in Perth and Kinross, higher admission rates due to
falls are to be expected. This is reflected in the rate of 25
admissions per 1,000 people aged 65 and over in Perth and
Kinross, compared to 23 per 1,000 for Scotland. Despite this,
performance against this indicator remains good, with a marginal
improvement of 1.6% compared to last year
• Seven parks and play areas were enhanced- in Bridge of Earn,
Luncarty, Blairgowrie, Scotlandwell, Greenloaning and Braco –
with design development continuing for a further four in Perth
and Crieff. Each project was shaped through community
consultation to reflect local needs and aspirations.
• The Right Track programme, supporting young people aged 16-
26 on deferred sentences, was recognised with a Butler Trust
Commendation for the Right Track Project Officer.   The
programme and participants continue to feedback positively on
the sense of achievement they gain from participating, noting
they have had the opportunity to learn skills they never thought
were possible for them.  A review was carried out in 2024/25 
and highlighted strong outcomes and identified development
areas, including identifying resilience as a risk. In November
2024, an additional worker was recruited to increase capacity. 
CASE STUDY
During the 2024 Olympics, 20 care homes and three day
centres took part in the annual Go4Gold challenge, with
residents and service users taking part in physical and
wellbeing challenges in their own setting. The event, jointly
facilitated by the HSCP and Scottish Care, celebrated
participation and community spirit.

Page 46

45 
PKC - GENERAL
CASE STUDY
Girls for Change: Get Active, Get Confident brought
together 40 pupils from across Perth and Kinross for a day of
workshops and fitness sessions aimed at building confidence
and promoting physical activity. Held at Dewars Centre, the
event tackled body image, exercise myths, and gender
inequalities. Inspired by the day, pupils at Bertha Park High
School launched an “Into Exercise” project to support peers
disengaged from PE. Early results show promising
improvements in participation and wellbeing. 
Action: Improve health and wellbeing in Perth and
Kinross by ensuring that people have access to
wellbeing support when they need it 
Through integrated care, dementia support, technology-enabled
services and targeted help for unpaid carers, we’re improving health
outcomes and supporting people to live well in their communities.
Key activities contributing to this in 2024/2025 include:
• Between April 2024 and February 2025, 113 people were
supported by local integrated care services to remain at home
and avoid crisis placements or hospital admissions service,
helping shift the balance of care. 
• In Perth city, the integrated hub is now fully established, enabling
rapid, multi-disciplinary responses when health deteriorates.
Urgent care Advanced Nurse Practitioners are working with
locality teams to expand this model across the region.
• Dementia support has grown through Alzheimer Scotland’s Brain
Health Centre and dementia cafés. In 2024, 275 referrals were
made for Post Diagnostic Support (PDS), with 279 people
receiving support by December – an increase of 12% from
January.
• The Community Alarm service handled 260,911 calls in
2024/2025, with 99.26% answered within 60 seconds - up from
98.83% the previous year. The service now supports over 3,900
clients and 12,000 devices, helping people stay safe and
independent at home.
• In 2024/2025, 692 unpaid adult carers received tailored support
through statutory services, including day centres, sitting services,
and respite. These services offer carers essential breaks to help
maintain their own wellbeing. Additionally, 166 carers benefited
from donated Respitality breaks, 252 were referred to Live
Active for wellbeing support, and 472 received grants under the
Time to Live Scheme.
• PKAVS Carers’ Centre was awarded the Carers’ Trust for
Carers’ Quality Award, recognising its commitment to
outstanding service delivery. The centre had 1,622 adult carers
registered this year - a 15% increase since June 2024. The
Carers’ Centre delivered the following supports to carers in
2024-2025.
• Carers have a higher risk of financial exclusion. In 2024/2025,
847 unpaid carers received support from Citizens’ Advice, mainly
with debt and energy advice -a 40% increase from the previous
year. We are working with partners and internal teams to identify
those in need and ensure they are signposted to appropriate
support.
• Since January 2024, all Inpatient Mental Health and Learning
Disabilities Services in Tayside have been using SafeCare to
reflect real time staffing visibility, red flags and associated
mitigations and professional judgement
• One of our key learning objectives this year across the Mental
Health Service family has been further enhancement of staff
knowledge of Adult Support and Protection particularly for Senior
Charge Nurses, Team Leaders, Clinical and Professional Team
Managers, Integrated Managers and Service Managers. The
Service have been working proactively with both Perth and
Kinross Council and NHS Adult Protection Teams to progress

Page 47

46 
PKC - GENERAL
this with two half day events delivered engagement with the
Police Scotland Public Protection Unit and engagement with the
Scottish Fire and Rescue Service for fire safety.
Areas of Focus
• Improve health and wellbeing in Perth and Kinross by increasing
overall participation in sport and physical activity and promoting
the wellbeing benefits of time spent in our natural surroundings
• Improve health and wellbeing in Perth and Kinross by ensuring
that people have access to wellbeing support when they need it 
Links to other Performance Information
➢ Community Justice Progress Report 2023-24 (Item 5)
➢ Joint Carers Strategy 2023 to 2026
➢ IJB Annual Performance Report 2024/2025

Page 48

47 
PKC - GENERAL
Key Performance Indicators related to this priority
Data will be indicative of performance and should be considered in the context of the current operating environment and level of influence.
Key Actions
(summary) Indicator Control /
Influence
Performance Comments
21/22 22/23 23/24 24/25  Annual
Change
Target
Target:
Met/Not
Met 
Improve
health and
wellbeing in
Perth and
Kinross by
increasing
overall
participation
in sport and
physical
activity and
promoting the
wellbeing
benefits of
time spent in
our natural
surroundings
Number and
percentage of the
total school roll
(primary and
secondary)
participating in
Active Schools/
School Sports
Influence 5,190
29%
7,200
39%
7,776
42%
7,859
43% 
43%    Participation in extra-curricular sport
activities has continued to rise, with 38% of
secondary school pupils involved in extra-
curricular clubs – placing Perth and Kinross
in the top three local authorities in Scotland.
Number of
attendances at
pools, indoor and
outdoor sports and
leisure facilities
and programmes
(thousands)
Influence 564K 1.002M 1.116M 951K 1.013m  Attendance at Live Active Leisure venues
fluctuated due to the closure of Bells Sports
Centre following flooding. Q1 saw 241,577
visits. Q2 dropped to 212,967 (-12%) with
the quieter summer period, before rising
slightly in Q3 to 220,490 (+3.5%). In Q4,
following the successful relocation of the
gym to Dewars Centre, attendance rose to
275,545 (+25%) driven by higher gym
memberships and overall attendance, plus
increased use of classes and sports halls
across other venues in Perth and Kinross.
Percentage of
residents satisfied
with local leisure
facilities
Influence 74%
(2019-
2022)
73%
(2020-
2023)
75%
(2021-
2024)
N/A

70% N/A 
(Target
set but
data not
yet
available)
Data for 2024-2025 not available until
publication of LGBF. Information is
based upon most recent data published.
Latest figures indicate a 2% increase
compared to previous and are above the
national average of 67%.

Page 49

48 
PKC - GENERAL
Key Actions
(summary) Indicator Control /
Influence
Performance Comments
21/22 22/23 23/24 24/25  Annual
Change
Target
Target:
Met/Not
Met 
Percentage of
adults satisfied
with parks and
open spaces 
Control 90%
(2019-
2022)
91%
(2020-
2023)
89.7%
(2021-
2024)
N/A 

N/A
(Target
Not Set)
N/A Data for 2024-2025 not available until
publication of LGBF. Information is
based upon most recent data published.
Satisfaction with parks and open spaces
remains high at 89.7% (2021-24), slightly
down from 91.3% in 2020-23 but still above
the national average of 85%. 
Improve health
and wellbeing in
Perth and
Kinross by
ensuring that
people have
access to
wellbeing
support when
they need it 
Mental Health -
Reduction in
waiting times for
people to access
Mental Health
Services (weeks)
Influence 33 36 39 42       N/A
(Target
Not Set)
N/A The increase in waiting times is attributed to
unprecedented referral levels, increased
awareness and prevalence of Mental Health
conditions, and more people seeking neuro-
diversity assessments (such as ASD and
ADHD). Community Mental Health Teams
are focused on complex cases, resulting in
many referrals being rejected or waitlisted,
while alternative services are also at
capacity.
A new Model of Care is being developed
across Tayside, aiming to implement a
single point of referral and triage system to
reduce waiting lists and improve timely
access.
Percentage
increase in people
who feel that their
health and social
care support was
easily accessible
and well
communicated
Influence 80% 89% 57% N/A
(HACE
data
availabl
e 25-
26)
N/A N/A
(Target
Not Set)
N/A HSCP no longer uses the Service User
Experience Survey (SUPE). Future reporting
will use data from the HACE survey,
available next year.  As the HSCP
implements the newly approved IJB
Performance Framework new measures and
targets will be established to supplement the
2 yearly publication of HACE data.

Page 50

49 
PKC - GENERAL
Priority: Working in partnership with
communities 
We recognise that there is no one-size fits all solution to working
with communities to address local needs. In 2024/25 we have
tested and operated different approaches. Some of the progress
made is outlined below. 
Action: Establish locality multidisciplinary teams
working with our community planning partners and
residents to identify and address local solutions to
local needs 
In 2024/25, we expanded our multidisciplinary approach to tackling
poverty and inequality across Perth and Kinross, supported by
Scottish Government funding through the Fairer Futures Fund. Our
Fairer Futures project is a placed based and data driven approach
to identifying and addressing communities of highest need within
Perth and Kinross and then delivering a multi-disciplinary holistic
approach in partnership with those communities.
By deepening local engagement, strengthening service
coordination, and enhancing community resilience, we are building
a more inclusive and responsive support system tailored to the
needs of our most vulnerable communities. Key activities
contributing to this in 2024/25 include: 
• Secured Fairer Futures funding support to scale up our
multidisciplinary approach, appointing a programme manager
and recruiting a dedicated project team to lead delivery in new
priority localities: Rattray, South Crieff, and Muirton, alongside
existing pilots in Letham, Highland, and Coupar Angus.
• Advanced the Letham Action Plan by bringing additional
services into the hub, commissioning youth work from YMCA,
and conducting further community consultation.
• Reviewed the Coupar Angus Action Plan and provided targeted
support to the Strathmore Hub to develop a sustainable
operating model.
• Engaged with communities in Highland through consultation
sessions in Aberfeldy, Pitlochry, and Kinloch Rannoch to inform
future planning.
• Strengthened local coordination by consolidating Community
Support and Enforcement services, with new leadership roles
enabling more effective collaboration between specialist and
locality-based teams.
• Supported a record 65 community groups—exceeding our
target of 60—to establish Community Resilience Groups using
ringfenced Council funding, enhancing emergency
preparedness and response, as demonstrated during severe
weather events.
• Delivered targeted enforcement actions, including Operation
Anvil, which improved public safety and consumer protection
through successful interventions such as the seizure of
counterfeit tobacco and the issuing of a significant fine. 
CASE STUDY
A Community Outreach Programme initiated to support the
prevention of fraud and scams amongst vulnerable people. 
The programme visits various community groups and engages
with residents providing advice on scams whilst assessing if
individuals require further support.

Page 51

50 
PKC - GENERAL
Action: Increase the supply and availability of rural
housing 
Our efforts focus on securing long-term tenancies, prioritising local
connections, and strengthening collaboration with key partners to
deliver sustainable housing solutions. Key activities contributing to
this in 2024/25 include:
• We acquired 20 residential properties in Dunkeld from the
National Trust for Scotland (NTS), enabling 20 households to
transition into secure Council tenancies and increasing access to
affordable housing in the area. 
• We worked closely with NTS and tenants to ensure a smooth
transition, providing responsive support throughout the handover
process. 
• We introduced a local lettings policy that prioritises future
allocations for individuals with strong ties to the Dunkeld area,
reinforcing our commitment to the principle of “local homes for
local people. 
Action: Develop and expand our approach to
working with communities to identify local actions
and priorities and deliver on these together
We are deepening our partnership with communities by co-
designing local solutions, investing in inclusive spaces, and
empowering residents to shape decisions that matter to them. Our
approach is rooted in trust, transparency and shared ownership,
ensuring that local priorities drive meaningful change. Key activities
contributing to this in 2024/25 include:
• The development of new chalets at Double Dykes – phased
occupation of which began in May 2025 - represents part of our
wider investment in high-quality, culturally appropriate
accommodation for Gypsy/Traveller communities. We introduced
a resident-led engagement model shaped by direct feedback,
including regular on-site sessions, digital participation via
Microsoft Teams, tailored newsletters, and real-time updates
through noticeboards - strengthening trust and empowering
residents to play an active role in shaping their living
environments.
• Through our Warm Welcome Initiative, we allocated over
£200,000 to more than 100 community groups to create warm,
welcoming spaces during winter. Co-design workshops led to a
34% increase in overall attendances (45,336), a 36% increase in
unique attendees (6,156), and a 67% boost in volunteer
participation (835 volunteers). Warm Welcome Evaluation Report
24/25
• We allocated £100,000 through our Locality Participatory
Budgeting Fund to 28 community groups in areas facing the
greatest socio-economic challenges. Residents voted on
proposals tackling poverty, cost of living, and volunteer
development, with 2,516 votes cast – a 23% increase from last
year. Children and young people played a key role, with 799
aged 5-17 actively involved. 
• We supported 118 volunteer groups who contributed 40,000
hours to enhancing greenspace management. Despite reduced
funding, we provided insurance, training, materials, and, in some
cases, financial support, helping enhance local spaces and
community pride.
• We consulted communities on the design of 11 play areas,
receiving 486 responses. Workshops with schools ensured
children’s voices were heard, resulting in inclusive,
multifunctional designs that reflect local aspirations. 
• We contributed £0.5 million towards new changing facilities at
Davie Park, led by Blairgowrie and Rattray Community Football
Club - demonstrating the impact of joint investment in
community-led infrastructure.

Page 52

51 
PKC - GENERAL
• We updated our Equality aims and outcomes for 2025 to 2029
clear actions to promote fairness, inclusion, and opportunity for
all. Further details are provided in the Perth and Kinross Council
Equality and Perth & Kinross Council Equalities Mainstreaming
Report 2023-25. 
Action: Deliver our internal cultural change
programme ensuring all staff contribute to our
commitment to engage with and be accessible and
responsive to our residents and communities 
• We launched our Leadership Competency Framework, setting
out the actions and behaviours expected of all our teams to help
us deliver our organisational vision and strategic outcomes and
work effectively with communities.
• We revised our leadership model and introduced the Five
Foundations of Leadership to support cultural change and
improve how we engage with residents. This model will be
central to future leadership development activity.
• We adopted a new Performance and Development Discussion
(PDD) Framework making it mandatory for all staff in early
2025. It includes structured prompts to encourage meaningful
conversations about delivering better outcomes for people and
communities. All annual PDDs are recorded in our HR system
to support analysis and future organisational development
planning.
• We developed a Leadership and Manager Induction Toolkit as
part wider support for new managers in understanding their role
and responsibilities, including how they contribute to shaping
our culture. This guide, along with enhanced induction
processes, will be launched in 2025/26. 
Areas of Focus
• Scale up and roll out of Fairer Futures programme to Rattray,
South Crieff, Muirton and North Muirton.
• Develop updated locality profiles to support a needs-based
approach. 
• Support delivery of Business Improvement, Culture and
Behaviours and Workforce Planning workstreams of the
Leadership Development Phase 2 Transformation Project.
• Implement the newly developed Leadership and Managers
Induction toolkit. 
Links to other Performance Information
➢ People and Culture Strategy Action Plan
➢ Perth & Kinross Council Equalities Mainstreaming Report
2023-25. 
➢ Community Empowerment Annual Report 24-25 (Item 8)
➢ Locality PB Fund 24/25 - Funding Awards
➢ Community Investment and Local Action Partnership
Funds 2024/25 (Item 10) 
CASE STUDY
Parapet Repairs at Bridge of Cally were carried out following
storm damage in December 2023, with climate resilience built
into the design. A key moment came when a local resident
shared historical photos showing the bridge once had flood
chutes—prompting Perth & Kinross Council to reinstate them
as part of the repair. This community insight helped shape a
more effective and contextually appropriate solution. Combined
with drainage improvements and collaboration with
landowners, the works have successfully prevented further
flooding and strengthened local engagement in infrastructure
planning.

Page 53

52 
PKC - GENERAL
Key Performance Indicators related to this priority
Data will be indicative of performance and should be considered in the context of the current operating environment and level of influence.
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
21/22 22/23 23/24 24/25 Annual
Change  Target
Target:
Met/
Not Met
Increase the
supply and
availability of
rural housing
Total number of
houses built in rural
areas of Perth and
Kinross 
Influence 55 63 111 113

60    This includes 29 buybacks, 66 new builds, and 18
purchases from National Trust Scotland in
Dunkeld. 
Number of
Community
Development
Trusts supported to
increase the
availability of rural
housing 
Control N/A New
Indicator,
baseline to
be
established
and targets
set
thereafter
3 4 4

4 We are actively supporting four community
development trusts to explore community-led
affordable housing initiatives. Current projects
include: 
• refurbishment of two flats in Aberfeldy 
• planning permission in progress for 12 new
affordable homes in Kinloch Rannoch and
10 new affordable homes in Aberfeldy 
• negotiations to purchase three flats for mid-
market rent in Aberfeldy 
• a feasibility study to convert Blair Atholl’s
former rail station into three affordable
homes
Develop and
expand our
approach to
working with
communities 
Number of
community groups
with local resilience
plans 
Influence 26 28 53 65

60    The number of Community Resilience Groups
rose from 53 to 65 in 2024/25 - a 22.6% increase
– thanks to targeted funding awarded in the
Council budget, which enabled tailored support
from our Community Support and Enforcement
team. These groups played a vital role during
recent weather events, supporting local residents
and maintaining essential services.

Page 54

53 
PKC - GENERAL
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
21/22 22/23 23/24 24/25 Annual
Change  Target
Target:
Met/
Not Met   
Control
Number of
communit
y groups
supported
to
increase
their
capacity 
236 343 258 110  270  In 2024/25, 110 community groups received
support—of which 91 were new to the service.
This highlights the team’s growing role in
building the capacity of emerging and less-
established groups, helping them to develop
skills, confidence, and sustainability for the
future.
It is to be noted that we have strengthened our
reporting processes to ensure greater accuracy.
Previously, we counted the number of times a
community group was supported. Under the new
method, we count the number of individual
community groups supported. This change
provides a more reliable picture of the support
being delivered. While it may result in a lower
overall figure being reported, it better reflects the
breadth of our engagement.
Future targets will be revised to align with this
updated reporting approach.
Number of
community groups
supported in the
asset transfer
process 
Influence 7 26 31 34

25    We supported 34 community groups who
expressed interest in Community Asset Transfer
(CAT), offering a single point of contact and clear
asset information. Sixteen groups are still actively
considering the process, with several expected to
progress to Stage 2 within the next year. Others
have found alternative solutions that better suit
their needs. 
Number of groups
receiving community
investment funding 
Control 141 85 104 115

110    CIF award numbers will vary year on year
depending on the projects that ward panels chose
to support. In 2024/25, we received 161
applications - up from 110 the previous year - and
distributed £326,383 between 115 groups, an
increase of 11.

Page 55

54 
PKC - GENERAL
Key Actions
(summary) Indicator Control /
Influence
Performance
Comments
21/22 22/23 23/24 24/25 Annual
Change  Target
Target:
Met/
Not Met
Number of
participation
requests 
Influence 0 0 0 2


N/A
(not
appropria
te to set
targets) 
N/A We received two participation requests. One,
related to a proposed rural library closure, was
accepted but did not progress as the library
remained open. The second was declined due to
timing, but we committed to working with the
community when it is time to progress the
outcomes with which they are concerned.
Note: Participation Requests (PRs), introduced
under the Community Empowerment Act, provide
a legal safeguard for community groups seeking
greater involvement in decision-making and
service delivery. An increase in PRs may indicate
growing community confidence and capacity—a
positive sign—or highlight shortcomings in initial
Council engagement, which would be a concern.

Page 56

55 
PKC - GENERAL
Key contact
For further information on any area of this report please contact the Strategic Planning, Performance and Risk Team
stratplanperform@pkc.gov.uk. 
Disclaimer: All hyperlinks correct at time of publication