Democracy Spraffa

Agenda Document Pack - Perth and Kinross Council - 07/05/2025

Perth and Kinross Council · 7 May 2025
Back to Perth and Kinross Council — 7 May 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Ambition | Compassion | Integrity
Our vision is for
a Perth and Kinross where everyone can live life well,
free from poverty and inequality
Council Building
2 High Street
Perth
PH1 5PH
30/04/2025
A hybrid meeting of Perth and Kinross Council will be held in the Council Chamber
on Wednesday, 07 May 2025 at 10:00.
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk.
THOMAS GLEN
Chief Executive
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode.
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting.
Members:
Provost X McDade
Depute Provost A Parrott
All Bailies
All Councillors
Page 1 of 200

Page 2

Page 2 of 200

Page 3

Perth and Kinross Council
Wednesday, 07 May 2025
AGENDA
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY FINANCIAL
OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY ITEM ON THIS
AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE OF CONDUCT.
1 WELCOME AND APOLOGIES
2 DECLARATIONS OF INTEREST
3 MINUTES
3(i) MINUTE OF SPECIAL MEETING OF PERTH AND KINROSS
COUNCIL OF 26 FEBRUARY 2025 FOR APPROVAL
(copy herewith)
5 - 54
3(ii) MINUTE OF MEETING OF PERTH AND KINROSS COUNCIL OF
5 MARCH 2025 FOR APPROVAL
(copy herewith)
55 - 58
4 NOTICE OF MOTIONS
4(i) THE 300TH ANNIVERSARY OF THE BLACK WATCH
(copy herewith)
59 - 60
5 OUTSTANDING BUSINESS STATEMENT
(copy herewith 25/110)
61 - 62
NOTE:
There will be a presentation prior to this Item
6 TAY CITIES REGIONAL DEAL PROGRAMME MID-TERM
REVIEW
Report by Strategic Lead - Economy, Development and Planning
(copy herewith 25/111)
63 - 82
7 ANNUAL TREASURY REPORT 2024-2025
Report by Strategic Lead - Finance and Business Support (copy
herewith 25/112)
83 - 96
8 TRANSFORMATION AND CHANGE PROGRAMME UPDATE 97 - 144
Page 3 of 200

Page 4

Report by Strategic Lead - Projects and Programmes (copy
herewith 25/113)
9 SHORT-TERM LET CONTROL AREA
Report by Strategic Lead - Economy, Development and Planning
(copy herewith 25/114)
145 - 200
10 SENIOR COUNCILLOR REMUNERATION
Council is asked to agree that following a review of workload the
Conveners of both the Licensing Board and Local Review Body to
be paid at the higher grade of Senior Councillor remuneration.
11 ELECTED MEMBERS BRIEFING NOTES
Council is asked to note the following Elected Members  Briefing
Notes that have been issued to elected Members since the
previous Council meeting: 
4 March National Speed Management Review (Transport Scotland)
7 March Update on consolidation review of Community safety and
Parking & Civil Contingencies
7 March Technical issue affecting Community Alarm system
9 March Community Alarm system update
12 March Transfer of Housing Repairs calls to Customer Service
Centre
20 March Outcome of Scottish Housing Regulator investigation into
Gypsy/Traveller site standards
21 March Turnover - Chief Officers
8 April Provision of Visitor Management Service
10 April Events to commemorate 80th anniversary of VE Day
11 April Disclosure (Scotland) Act 2020 Implementation#
11 April People Seeking Asylum Home Office Grant Funding
Allocation 2025/26
Page 4 of 200

Page 5

SPECIAL MEETING OF PERTH AND KINROSS COUNCIL
Minute of special hybrid meeting of Perth and Kinross Council held in the Council
Chamber, 2 High Street, Perth on Wednesday 26 February 2025 at 9.30am.
Present: Provost X McDade, Depute Provost A Parrott, Bailies C Ahern, A Bailey, R
Brock, C McLaren and M Williamson; Councillors K Allan, H Anderson, L Barrett, P
Barrett, B Brawn, S Carr, A Chan, D Cuthbert, S Donaldson, E Drysdale, J Duff, A
Forbes, M Frampton, N Freshwater, K Harvey, D Illingworth, I James, N Khogali, G
Laing, B Leishman, I MacPherson, I Massie, S McCole, T McEwan, J Rebbeck, C Reid,
W Robertson, C Shiers, F Smith, C Stewart, G Stewart, R Watters and J Welch.
In Attendance: T Glen, Chief Executive; C Mailer, Depute Chief Executive; L Simpson,
Strategic Lead - Legal and Governance; S Walker, Strategic Lead – Finance and
Business Support;  J Pepper, Director/Chief Officer, Perth and Kinross Health & Social
Care Partnership, S Crawford, Strategic Lead – Property Services; S Merone, Strategic
Lead – Economy, Development and Planning; L Brady, K Fraser, A O’Brien, N
Sutherland, S Hendry, A Brown and M Pasternak (all Legal and Governance).
Provost X McDade, Presiding.
1. Welcome And Apologies
Provost McDade welcomed all those present to the meeting.  No apologies were
submitted.
2. Declarations Of Interest
There were no Declarations of Interests in terms of the Councillors’ Code of
Conduct.
3. Notice of Petitions
3(i) Urge Perth and Kinross to Build an Ambitious PH2O Facility (PET-2024-01)
In terms of the Council’s petitions procedure, the Clerk to the meeting read out a
written statement from Mr. Bobby Brian, lead petitioner, on the contents of the petition.
There was submitted and noted a briefing report by Strategic Lead – Property
Services (25/34) on the contents of the petition.  (The following correction was noted in
relation to section 4.5:  Total visitor numbers in the petition scope is identified as
459,000 with the correct figure to be 472,000. The variance marked as 79,000 to be
moved to 92,000). 
It was noted that the Council’s official response to the petition would be
considered later in the meeting as part of the budget setting process.
3(i)
Page 5 of 200

Page 6

3(ii) Save our Rural Libraries (PET-2025-02)
In terms of the Council’s petitions procedure, Ms. Hannah Wickes, on behalf of
the Save Our Rural Libraries Campaign, addressed members on the contents of the
petition and answered a number of questions from members.
There was submitted and noted a briefing report by Strategic Lead – Economy,
Development and Planning (25/35) on the contents of the petition.
It was noted that the Council’s official response to the petition would be
considered later in the meeting as part of the budget setting process.
There followed a recess, and the meeting reconvened at 10.50am.
4. Strategic Planning Update 2026/27 to 2028/29 and General Fund Revenue
Budget
There was submitted a report by Strategic Lead – Finance and Business Support
(25/36) (1) providing Council with an update on the delivery of its ongoing strategic
transformation and change programme and alignment with the Medium -Term Financial
Plan approved by Council in December 2024, and (2) presenting the Council with
Provisional Revenue Budgets for 2025/26, 2026/27 and 2027/28.
]
Motion (Councillors G Laing and E Drysdale)
 Council agrees to defer consideration of Petition PET-2024-01 until the
meeting of 18 June 2025 when it is scheduled that a further report will be
submitted providing updated information and proposals in relation to
leisure water options for the Thimblerow site for PH2O as well as the future
of both Bell’s Sports Centre and the Dewars Centre.
 Council notes the contents of Petition PET-2025-02.
 Council further agrees:
1. To approve the 2025/26 Provisional Revenue Budget of £499.273 million as set
out in Appendix B of Report No. 25/36.
2. To approve the 2026/27 Provisional Revenue Budget of £502.587 million as set
out in Appendix B of Report No. 25/36.
3. To approve the 2027/28 Provisional Revenue Budget of £515.226 million as set
out in Appendix B of Report No. 25/36.
4. To approve the expenditure pressures as set out in Appendix C of Report No.
25/36 with the exception of those listed in Appendix (i).
Page 6 of 200

Page 7

5. To approve the budget reductions / additional income as set out in Appendix
C of Report No. 25/36 with the exception of those listed in Appendix (ii).
6. To approve the additional budget reductions / additional income as set out in
Appendix (iii) of this Revenue Budget Motion.
7. To approve the additional expenditure proposals as set out in Appendix (iv)
of this Revenue Budget Motion.
8 To approve an additional contribution from Reserves of £3.559 million in
2025/26 in this Revenue Budget Motion.
9 To approve an additional contribution to Reserves of £1.682 million in 2026/27
in this Revenue Budget Motion.
10 To approve an additional contribution from Reserves of £301,000 in 2027/28
in this Revenue Budget Motion.
11 To approve the Council Tax bases of 75,157 for 2025/26, 75,910 for 2026/27
and 76,600 for 2027/28.
12 To approve the contribution to Perth & Kinross Integration Joint Board of
£106.133 million which is included in the 2025/26 Provisional Revenue
Budget.
13 o approve the earmarked general fund balances set out in Appendix G with
the exception of the adjustments listed in Appendices (v), (vi) and (vii).
14 To approve that uncommitted Reserves are maintained at a minimum of 2% to
4% of the 2025/26 Provisional Revenue Budget which equates to £9.985 million
to £19.970 million
15. To approve a provision for the non-collection of Council Tax of 1.75% in
2025/26, 2026/27 and 2027/28.
16. To approve the 2025/26 Final Revenue Budget of £503.828 million resulting in
a Band D Council Tax of £1,537.04 in 2025/26 as summarised in Appendix (v)
of this Revenue Budget Motion. This represents a 9.5% increase from the
Council Tax Band D figure for 2024/25.
17. To approve the 2026/27 Provisional Revenue Budget of £504.298 million
resulting in an indicative Band D Council Tax of £1,683.05 in 2026/27 as
summarised in Appendix (vi) of this Revenue Budget Motion. This represents
an indicative 9.5% increase from the Council Tax Band D figure for 2025/26.
18. To approve the 2027/28 Provisional Revenue Budget of £514.489 million
resulting in an indicative Band D Council Tax of £1,784.03 in 2027/28 as
summarised in Appendix (vii) of this Revenue Budget Motion. This represents
an indicative 6.0% increase from the Council Tax Band D figure for 2026/27.
Page 7 of 200

Page 8

PERTH AND KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
APPENDIX (i)
Reference
Report No.
25/36
REVENUE BUDGET MOTION - SCOTTISH NATIONAL PARTY Page No. 25/26 26/27 27/28
EXPENDITURE PRESSURES REJECTED £'000 £'000 £'000
Developing a resilient, stronger and greener local
economy Perth and Kinross Heritage Trust 50 55
Enabling our children and young people to achieve their full potential
Teachers Slippage Target 51 552
Home to School Transport 51 420 255 240
TOTAL EXPENDITURE PRESSURES REJECTED 1,027 255 240
PERTH AND KINROSS COUNCIL APPENDIX (ii)
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
Reference
Report No.
25/36
REVENUE BUDGET MOTION - SCOTTISH NATIONAL PARTY Page No.     25/26  26/27  27/28
BUDGET REDUCTIONS / ADDITIONAL INCOME REJECTED £'000  £'000  £'000
Working in partnership with our communities
Garden Waste Permit Charge 67 65 68
TOTAL BUDGET REDUCTIONS / ADDITIONAL INCOME REJECTED 0 65      68
Page 8 of 200

Page 9

PERTH AND KINROSS COUNCIL APPENDIX (iii)
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET MOTION - SCOTTISH NATIONAL PARTY
25/26 26/27 27/28
ADDITIONAL BUDGET REDUCTIONS / INCOME PROPOSALS £'000 £'000 £'000
Organised to Deliver / Transformation
Targeted efficiency target from transformation from the investment in technology /
artificial intelligence strategic programme
1,000
TOTAL ADDITIONAL BUDGET REDUCTIONS / INCOME PROPOSALS 0 0 1,000
Page 9 of 200

Page 10

26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET MOTION - SCOTTISH NATIONAL PARTY
CORPORATE PLAN 2023 - 2028
ADDITIONAL EXPENDITURE PROPOSALS
APPENDIX (iv)
25/26      26/27   27/28
£'000      £'000    £'000
TACKLING POVERTY
Scottish Welfare Fund / Financial Insecurity Funding 500
The cost-of-living crisis continues to cause significant hardships for many. Now in 2025, with price
inflation including food and clothing, higher mortgage rates/rents and increasing energy costs, more
and more families are struggling to make ends meet month to month. This funding will be available
to residents feeling the impact of the current cost of living. (non-recurring)
Scottish Welfare Fund 100
To allow the team to develop the established partnership working with community
groups/foodbanks and prisons to capture those most in need at times of crisis/transition.
(recurring)
Welfare Rights Capacity 89
Additional capacity to allow our team to continue to meet the rising demand of households in need
throughout Perth and Kinross using a proactive approach which prevent crisis and provide longer-term
sustainable solutions. (recurring)
Buttons & Bows 20
Additional funding to support the inspirational work of this Buttons and Bows who provide a
valuable service to our families (non-recurring)
Child Poverty Fund 75
Funding to enable front line workers to make instant decisions and one-off payments for the
purchase of goods and services to resolve a problem for a child or household affected by poverty
(non-recurring)
Continue with the provision of Food and Fun activities during school holiday periods 30      50
This fund will enable community and 3rd sector groups to bid for funds to operate food and fun
activities for groups of children and young people during school holiday periods. (non-recurring)
Good Food Nation 40
Funding to enhance food quality, promote sustainable practices, improve public health, and
support local producers. (non-recurring)
Rural Poverty 50      50    50
Additional investment to support employability initiatives across rural Perth and Kinross
(non-recurring)
Page 10 of 200

Page 11

26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET MOTION - SCOTTISH NATIONAL PARTY
CORPORATE PLAN 2023 - 2028
ADDITIONAL EXPENDITURE PROPOSALS
APPENDIX (iv) con.
25/26   26/27   27/28
£'000   £'000   £'000
200
TACKLING CLIMATE CHANGE AND SUPPORTING SUSTAINABLE PLACES
Green Living Fund
Funding for community-led projects focused on tackling the climate change and biodiversity
emergencies, with the purpose of enabling applicants to use these funds to lever in additional
funding. (non-recurring)
Support for Bloom Groups, Biodiversity Groups and Friends of Cemeteries
Provide additional funding to Support Bloom Groups, Biodiversity Groups and Friends of
Cemeteries, to support the work of their volunteers and build on the highly successful and visible
initiatives that currently make a big difference within local communities across Perth and Kinross.
(recurring)
42
Support for Bloom Groups, Biodiversity Groups and Friends of Cemeteries
In order to support the invaluable contributions of Bloom Groups, Biodiversity Groups and Friends
of Cemeteries, supplementary funding for trees, shrubs, plants and seeds
(non-recurring)
20 20
Additional Verge Cut
Extra funding for verge cutting to enhance the safety for road users (recurring)
70
Biodiversity
Additional funding to support the roll out and enhancement of the Grow Wild project, providing extra
resources to improve, grow and maintain Grow Wild areas with more trees and pollinators to
maximise biodiversity. (non-recurring)
200 200
Ash Dieback
Funding to enable the council to commence a survey of ash trees on Council land and determine
state of Ash Die Back to help towards a more resilient PKC (non-recurring)
125
DEVELOPING A RESILIENT, STRONGER AND GREENER LOCAL ECONOMY
Modern Apprentices / Employability / Graduate Trainees / Training Opportunities
To enhance apprenticeship through employability, practical experience, graduate training programs
and training opportunities tailored to industry needs (non-recurring)
150 150 150
Funding for Public Transport
Additional investment in local buses to provide free travel on one Saturday per month, one prior to
Christmas and on Clear Air Day in June. (non-recurring)
168
Page 11 of 200

Page 12

Adapt Your Property
To encourage the development of empty buildings to bring them back into use for economic and
socially productive purposes, £300,000 of borrowing capacity for three years (recurring)
15 15 15
Commercial Property Investment
To meet the borrowing costs associated with an extra £7 million capital investment in economic
development in serviced units and land (recurring)
135 90 90
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET MOTION - SCOTTISH NATIONAL PARTY
CORPORATE PLAN 2023 - 2028
ADDITIONAL EXPENDITURE PROPOSALS
APPENDIX (iv) con.
25/26     26/27   27/28
£'000   £'000   £'000
170 170 170
ENABLING OUR CHILDREN AND YOUNG PEOPLE TO ACHIEVE THEIR FULL POTENTIAL
Instrumental Music Service
Funding to continue the existing provision of the Instrumental Music Service (non-recurring)
Outdoor Learning
Development of outdoor environments in schools to support children with more complex additional
support needs (non-recurring)
50
Core Information Boards
Offering a voice to our young people in the school playground who might otherwise struggle to
express themselves enabling them to fully engage in play and social interaction (non-recurring)
9
PROTECTING AND CARING FOR OUR MOST VULNERABLE PEOPLE
Care and Repair
To support individuals by providing maintenance, assistance and repairs for homes, ensuring
safety, comfort and accessibility (recurring)
300 100
Social Care
Earmarked reserves to fund transformation across social care, supporting early intervention,
innovation in social care and promoting a shift in the balance of care from hospital to community.
(non-recurring)
500 500
Social Care
Funding to support a new model of community-led care and support in remote/rural communities
across Perth and Kinross (non-recurring)
50 50
Intensive Housing Support
To provide support with personalised assistance, helping them secure stable housing, access
resources, and maintain tenancy (non-recurring)
70
RASAC
Further funding to support the vital work of this organisation (non-recurring)
30
Women's Aid
Further funding to support the vital work of this organisation (non-recurring)
30
Page 12 of 200

Page 13

APPENDIX (iv) con.
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET MOTION - SCOTTISH NATIONAL PARTY
CORPORATE PLAN 2023 - 2028 25/26    26/27    27/28
£'000   £'000   £'000
ADDITIONAL EXPENDITURE PROPOSALS
SUPPORTING AND PROMOTING PHYSICAL AND MENTAL WELLBEING
Free Pitch Hire 21
To encourage use of our grass pitches throughout Perth and Kinross for organised / pre-booked matches
(recurring)
Farmstrong 5            5
Promotion of mental health and wellbeing in the farming community (non-recurring)
The Neuk 70
Support for the community Hub to strengthen and support the wellbeing of individuals (non
recurring)
Community Mental Health Support Groups 60
For community groups supporting better mental health across Perth and Kinross for example,
Men's Shed, Women's Wellbeing Club, Andy's Mans Club and Mindspace (non-recurring)
WORKING IN PARTNERSHIP WITH OUR COMMUNITIES
Support for Culture Perth and Kinross 500       500
To enable Culture Perth and Kinross to maintain current service provision for libraries and
Museums (non-recurring)
Roads Maintenance                                                                                                                              45
Investment in non-trunk road transport infrastructure to meet borrowing costs associated with a
£1 million capital investment in local roads. (recurring)
Investment in Structures 90
Borrowing capacity to invest a further £2 million in our bridges and structures (recurring)
Community Resilience Fund 775
The creation of an earmarked Reserve to support Community resilience when required. (non
recurring)
Community Resilience Fund 200
To continue and expand our work with community groups on building resilience and supporting
welfare responses during weather events and emergencies, we need to invest further in community
resilience groups. This investment not only prepares communities for emergencies but also
promotes social, economic, and environmental well-being, leading to stronger and more
sustainable communities (non-recurring)
Community Resilience Fund - Vulnerable Persons Database 25
This will enable groups and officers to target support and assistance effectively while enhancing the safety
and well-being of at-risk individuals, ultimately leading to stronger and more resilient communities (non-
recurring)
Page 13 of 200

Page 14

26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET MOTION - SCOTTISH NATIONAL PARTY
CORPORATE PLAN 2023 - 2028
ADDITIONAL EXPENDITURE PROPOSALS
APPENDIX (iv) con.
25/26   26/27    27/28
£'000    £'000    £'000
Investment in local communities
Via the Local Action Partnerships / Participatory Budgeting (£100,000) and Community
Investment Fund (£200,000), to fund projects aimed at helping our communities deal with the cost-
of-living crisis for a better future (non-recurring)
300
Community Halls
Funding for LAL to maintain the provision of community halls (non-recurring)
20
Investment in Surface Water Management Schemes
Funding to support the investment in a "leaky dam" for the Rattray Burn and surface water
diversion measure (road hump) (recurring)
15
Community Councils
Increase in core grant funding to annual top up to £1,000 per annum (recurring)
12
Extended Opening of Recycling Centres
To allow the following Centres to remain open for an extra 2 hours one day a week during the
Summer months. Blairgowrie, Crieff, Friarton, Kinross, Inveralmond and Pitlochry.
(non-recurring)
12
Pipes and Drums
Continued support for the development of Pipes + Drums in PKC schools building on recent
success and encouraging continued support from the Scottish Schools Pipes and Drums Trust
(SSPDT) (non-recurring)
25 25 25
Jeanfield Swifts Community FC
Funding contribution towards creation of a new all-weather sports facility for children, families,
nearby schools and the wider community. (non-recurring)
100
Community Transport
Feasibility study examining Carse of Gowrie community transport provision (non-recurring)
20 20
Errol Buses
Funding to allow the morning bus service (pre 0750) to continue beyond March (recurring)
13
Auchterarder Buses
To support the continuing work of the Auchterarder Community Bus Group (non-recurring)
36 36
5,582 1,981 500
Page 14 of 200

Page 15

26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET MOTION - SCOTTISH NATIONAL PARTY
2025/26 COUNCIL TAX CALCULATION
APPENDIX (v)
2025/26
£'000 £'000
2025/26 Provisional Revenue Budget 499,273
Adjustments:
Reject Expenditure Pressures (Appendix i) (1,027)
Additional Expenditure Proposals (Appendix iv) 5,582
4,555
2025/26 Updated Provisional Revenue Budget 503,828
Funding
Total Revenue Funding (370,400)
Council Tax Second Home / Long Term Empty Properties (3,338)
Capital Grants (1,600)
Council Tax Single Person Discount (300)
Net Contribution from Reserves included in the Provisional Budget (3,112)
Contribution from Service Concession Scheme (6,000)
Contribution from unearmarked Reserves included in this Motion (926)
Contribution from earmarked Reserves included in this Motion (2,633)
(388,309)
AMOUNT TO BE LEVIED FROM COUNCIL TAX 115,519
TAX BASE BAND D EQUIVALENT PROPERTIES (1.75% Non-Collection) 75,157
FINAL 2025/26 BAND D COUNCIL TAX £ 1,537.04
INCREASE (2024/25 FINAL BAND D COUNCIL TAX £1,403.69) £ 133.35
PERCENTAGE INCREASE 9.5%
Excluding Water and Wastewater charges determined by Scottish Water.
Use of Earmarked Reserves
Car Park Trading Account 168
Transformation and Workforce Management 1,550
Anti-Poverty Measures 715
Green Capital Recovery Fund 200
2,633
Page 15 of 200

Page 16

26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET MOTION - SCOTTISH NATIONAL PARTY
2026/27 COUNCIL TAX CALCULATION
APPENDIX (vi)
2026/27
£'000 £'000
2026/27 Provisional Revenue Budget 502,587
Recurring impact of 2025/26 proposals (80)
Adjustments:
Reject Expenditure Pressures (Appendix i) (255)
Reject Budget Reductions / Additional Income (Appendix ii) 65
Additional Expenditure Proposals (Appendix iv) 1,981
1,791
2026/27 Updated Provisional Revenue Budget 504,298
Funding
Total Revenue Funding (370,400)
Council Tax Second Home / Long Term Empty Properties (3,338)
Capital Grants (1,600)
Council Tax Single Person Discount (300)
Net Contribution to Reserves included in the Provisional Budget 2,418
Contribution from Service Concession Scheme (5,000)
Contribution from earmarked Reserves included in this Motion (650)
Contribution to unearmarked Reserves included in this Motion 2,332
(376,538)
AMOUNT TO BE LEVIED FROM COUNCIL TAX 127,760
TAX BASE BAND D EQUIVALENT PROPERTIES (1.75% Non-Collection) 75,910
FINAL 2026/27 BAND D COUNCIL TAX £ 1,683.05
INCREASE (2025/26 FINAL BAND D COUNCIL TAX £1,537.04) £ 146.02
PERCENTAGE INCREASE 9.5%
Excluding Water and Wastewater charges determined by Scottish Water.
Use of Earmarked Reserves
Transformation and Workforce Management 550
Anti-Poverty Measures 100
650
Page 16 of 200

Page 17

26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET MOTION - SCOTTISH NATIONAL PARTY
2027/28 COUNCIL TAX CALCULATION
APPENDIX (vii)
2027/28
£'000 £'000
2027/28 Provisional Revenue Budget 515,226
Recurring impact of 2025/26 proposals (80)
Recurring impact of 2026/27 proposals 15
Adjustments:
Reject Expenditure Pressures (Appendix i) (240)
Reject Budget Reductions / Additional Income (Appendix ii) 68
Additional Budget Reductions / Income Proposals (Appendix iii) (1,000)
Additional Expenditure Proposals (Appendix iv) 500
(672)
2027/28 Updated Provisional Revenue Budget 514,489
Funding
Total Revenue Funding (370,400)
Council Tax Second Home / Long Term Empty Properties (3,338)
Capital Grants (1,600)
Council Tax Single Person Discount (300)
Net Contribution to Reserves included in the Provisional Budget 2,107
Contribution from Service Concession Scheme (4,000)
Contribution from earmarked Reserves included in this Motion (50)
Contribution from unearmarked Reserves included in this Motion (251)
(377,832)
AMOUNT TO BE LEVIED FROM COUNCIL TAX 136,657
TAX BASE BAND D EQUIVALENT PROPERTIES (1.75% Non-Collection) 76,600
FINAL 2027/28 BAND D COUNCIL TAX £ 1,784.03
INCREASE (2026/27 FINAL BAND D COUNCIL TAX £1,683.05) £ 100.98
PERCENTAGE INCREASE 6.0%
Excluding Water and Wastewater charges determined by Scottish Water.
Use of Earmarked Reserves
Anti-Poverty Measures 50
Page 17 of 200

Page 18

1st Amendment (Councillors J Duff and A Chan)
The Council agrees:
1. To approve the 2025/26 Provisional Revenue Budget of £499.273 million as set out in
Appendix B of Report No. 25/36.
2. To approve the 2026/27 Provisional Revenue Budget of £502.587 million as set out in
Appendix B of Report No. 25/36.
3. To approve the 2027/28 Provisional Revenue Budget of £515.226 million as set out in
Appendix B of Report No. 25/36.
4. To approve the expenditure pressures as set out in Appendix C of Report No. 25/36
with the exception of those listed in Appendix (i).
5. To approve the budget reductions / additional income as set out in Appendix C of
Report No. 25/36.
6. To approve the additional budget reductions / additional income proposals as set out in
Appendix (ii) of this Revenue Budget Amendment.
7. To approve the additional expenditure proposals as set out in Appendix (iii) of this
Revenue Budget Amendment.
8. To approve an additional contribution from Reserves of £2.815 million in 2025/26
in this Revenue Budget Amendment.
9. To approve an additional contribution to Reserves of £217,000 in 2026/27 in this
Revenue Budget Amendment.
10  To approve an additional contribution from Reserves of £575,000 in 2027/28 in this
Revenue Budget Amendment.
11. To approve the Council Tax bases of 75,157 for 2025/26, 75,910 for 2026/27 and 76,600
for 2027/28.
12. To approve the contribution to Perth & Kinross Integration Joint Board of £106.133
million which is included in the 2025/26 Provisional Revenue Budget.
13. To approve the earmarked general fund balances set out in Appendix G with the
exception of the adjustments listed in Appendices (iv), (v) and (vi).
14. To approve that uncommitted Reserves are maintained at a minimum of 2% to 4%
of the 2025/26 Provisional Revenue Budget which equates to £9.985 million to
£19.970 million.
15. To approve a provision for the non-collection of Council Tax of 1.75% in 2025/26,
2026/27 and 2027/28.
16. To approve the 2025/26 Final Revenue Budget of £501.502 million resulting in a
Band D Council Tax of £1,515.98 in 2025/26 as summarised in Appendix (iv) of this
Revenue Budget Amendment. This represents an 8.0% increase from the Council Tax
Band D figure for 2024/25.
17. To approve the 2026/27 Provisional Revenue Budget of £502.287 million resulting in
an indicative Band D Council Tax of £1,637.26 in 2026/27 as summarised in Appendix
(v) of this Revenue Budget Motion. This represents an indicative 8.0% increase from
the Council Tax Band D figure for 2025/26.
18. To approve the 2027/28 Provisional Revenue Budget of £512.926 million resulting in an
indicative Band D Council Tax of £1,760.05 in 2027/28 as summarised in Appendix (vi)
of this Revenue Budget Motion. This represents an indicative 7.5% increase from the
Council Tax Band D figure for 2026/27.
Page 18 of 200

Page 19

PERTH AND KINROSS COUNCIL  APPENDIX (i)
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - SCOTTISH CONSERVATIVE & UNIONIST GROUP
Reference
Report No.
EXPENDITURE PRESSURES REJECTED
Tackling climate change and supporting sustainable places Investment in
Waste Management
25/36 
Page No.
49
25/26
£'000
500
26/27
£'000
27/28
£'000
Enabling our children and young people to achieve their full potential
Teachers Slippage Target (partial) 51 276
Home to School Transport (partial) 51 200 50 50
Property Costs - Facilities Management, Cleaning & Catering (partial) 52 160 105 50
Working in partnership with our communities
Waste Disposal Contract (partial) 55 35 40 40
Public Transport Tendered Services (partial) 56 25 30 35
Organised to Deliver / Transformation
Property Maintenance (partial) 57 50 50
Transfer of Bell's from Live Active Leisure to Council (rephased) 58 180
TOTAL EXPENDITURE PRESSURES REJECTED 1,246 275 355
Page 19 of 200

Page 20

PERTH AND KINROSS COUNCIL APPENDIX (ii)
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - SCOTTISH CONSERVATIVE & UNIONIST GROUP
ADDITIONAL BUDGET REDUCTIONS / INCOME PROPOSALS
Organised to Deliver / Transformation 
Property Asset Review
25/26
£'000
25
26/27
£'000
75
27/28
£'000
Efficiency savings from the investment in technology / artificial intelligence 300 700
Corporate Slippage Target for Non-Teaching posts - increase by 0.5% 590
TOTAL ADDITIONAL BUDGET REDUCTIONS / INCOME PROPOSALS 615 375 700
APPENDIX (iii)
PERTH AND KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - SCOTTISH CONSERVATIVE & UNIONIST GROUP
CORPORATE PLAN 2023 - 2028 25/26   26/27   27/28
£'000  £'000  £'000
ADDITIONAL EXPENDITURE PROPOSALS
TACKLING POVERTY
Modern Apprenticeship Scheme: £150,000 investment for 3 years to maintain the current level 150 150   150
of Modern Apprenticeships within the Perth and Kinross Council workforce (non-recurring).
Perth and Kinross Skills Passport: £150,000 investment for 3 years to provide grants of up to 150 150   150
£3,000 to assist a minimum of 50 people back into work through the provision of financial 
assistance for help such as a training course or equipment (non-recurring).
Community Kitchen: Funding of £50,000 for 3 years to support Giraffe Perth to continue to 50 50    50
develop their training programme to teach cooking skills, reduce food waste, build confidence
and promote wellbeing to individuals and families in Perth and Kinross (non-recurring).
Page 20 of 200

Page 21

TACKLING CLIMATE CHANGE AND SUPPORTING SUSTAINABLE PLACES
Community Resilience: Investment of £100,000 for support to and expansion of Community 100 
Resilience Groups across Perth and Kinross (non-recurring).
Roads and Gullies: Investment of £100,000 to support the process of gully, culvert and ditch 100
cleaning to reduce surface water and mitigate the damaging impact of flooding (non-recurring).
Flood barriers for River Isla: Funding of £20,000 for the installation of three flood barriers at the 20
River Isla near to the U106 Bendochy Road crossroads at Coupar Angus (non-recurring).
Leaky Dam/NFM Rattray Burn: Borrowing to create capacity of £350,000 for the implementation 15 
of a Leaky Dam/NFM in the Rattray Burn and a surface water diversion (road hump) in Upper Allan
Street, Blairgowrie to protect local houses from flooding (recurring).
APPENDIX (iii) con.
PERTH AND KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - SCOTTISH CONSERVATIVE & UNIONIST GROUP
CORPORATE PLAN 2023 - 2028 25/26   26/27   27/28
£'000 £'000 £'000
ADDITIONAL EXPENDITURE PROPOSALS
DEVELOPING A RESILIENT, STRONGER AND GREENER LOCAL ECONOMY
Adapt Your Property: Borrowing to create capacity of £400,000 to convert underused/vacant town  20
and city centre commercial space for new commercial/residential uses providing 50% grants to a
maximum of £75,000 (recurring).
City and Town Centre Cleanliness Project: Investment of £150,000 in 2025/26 and 2026/27 to 150   150
carry out a deep clean of our city and town centres, removing litter, weeds, graffiti, and other
detritus, sweeping pavements, cleaning road and information signs, and making our centres more
attractive places in which to live, work or visit (non-recurring).
Ground Maintenance: Investment of £600,000 over 3 years to prevent any further reduction in 100   250   250
grass cutting and ground maintenance throughout Perth and Kinross (non-recurring).
Support for Events: Funding in 2025/26 to assist with the organising of council events across 75
Perth and Kinross (non-recurring).
Additional Support for Comfort Schemes: Funding of £10,000 to expand the availability of toilet 10
facilities through additional Comfort Scheme membership (recurring).
Childcare Project: Funding in 2025/26 and 2026/27 for Growbiz to establish a project to address 50 50
the lack of affordable childcare in rural Perth and Kinross by promoting childcare as an 
employment opportunity and providing ongoing support to new and existing childminders 
(non-recurring).
Residents car parking permits: No increase in residents car parking permit (non-recurring) 5
Residents car parking permits: Funded from Car Park Trading Account (non-recurring) (5)
Page 21 of 200

Page 22

Economic Development: Investment of £1 million in 2025/26 to benefit economic development in 1,000
Perth and Kinross and, in particular, to exploit opportunities surrounding the opening of the Cross
Tay Link Road, by aiding businesses in starting up, locating and growing in these newly developed
sites particularly through investment promotion via Invest in Perth (non-recurring).
Roads Maintenance: Borrowing to create a capacity of £1million for maintaining roads and fixing 45
potholes (recurring).
PERTH AND KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - SCOTTISH CONSERVATIVE & UNIONIST GROUP
APPENDIX (iii) con.
CORPORATE PLAN 2023 – 2028 25/26 26/27 27/28
£'000 £'000 £'000
ADDITIONAL EXPENDITURE PROPOSALS
ENABLING OUR CHILDREN AND YOUNG PEOPLE TO ACHIEVE THEIR FULL POTENTIAL
Pipes and Drums - Funding of £40,000 to support the continuation and expansion of the
successful programme of pipes and drums tuition in Perth and Kinross (non-recurring),
40
Additional Support Needs (ASN) Fund: Investment of £75,000 in 2025/26 and 2026/27 to provide
immediate resource for ASN projects in schools such as the creation of quiet spaces or the
purchase of special equipment pending completion of the 5-year ASN Transformation Project in
75 75
2028/29 (non-recurring).
Instrumental Music Service: Investment of £560,000 over the next 3 years to maintain the
existing Instrumental Music Service and develop further strategies for the continuance of
this service in future years (non-recurring)
140 210 210
PROTECTING AND CARING FOR OUR MOST VULNERABLE PEOPLE
RASAC Perth & Kinross: Additional funds of £40,000 in 2025/26 and 2026/27 to support women
and young people who have experienced sexual violence at any time in their lives (non-recurring)
40 40
Women's Aid: Additional funding of £40,000 for Women' Aid in 2025/26 and 2026/27 in
recognition of the increased incidence of domestic abuse in Perth and Kinross (non-recurring)
40 40
Page 22 of 200

Page 23

APPENDIX (iii) con.
PERTH AND KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - SCOTTISH CONSERVATIVE & UNIONIST GROUP
CORPORATE PLAN 2023 - 2028 25/26  26/27  27/28
£'000 £'000 £'000
ADDITIONAL EXPENDITURE PROPOSALS
SUPPORTING AND PROMOTING PHYSICAL AND MENTAL WELLBEING
Care and Repair: Investment of £250,000 in 2025/26, 2026/27 and 2027/28 in the Care and 250   250   250
Repair service to reverse approved cuts from previous years to this important service and assist
with reducing delayed discharge numbers (non-recurring).
Pitch Hire: Additional funding of £21,000 to maintain free grass pitch hire throughout Perth and 21
Kinross in 2025/26 for matches which are organised and pre-booked (non-recurring)
CulturePK: Investment of £500,000 in 2025/26 and 2026/27 to prevent the closure of the public
libraries in Alyth, Auchterarder, Birnam, Comrie and Scone, and maintain the venue opening hours
at AK Bell, Strathearn, Breadalbane, North Inch, Loch Leven and Blairgowrie Libraries, as well as
Perth Museum and Perth Art Gallery. This will allow Culture P&K and Perth and Kinross Council
time to examine levels of future service delivery (non-recurring).
500   500
The Neuk: £50,000 funding for The Neuk, Perth to support the continuation of a 24/7 50
service for their flagship, multi-agency, one stop crisis centre aimed at dealing with all
areas of mental health and suicide prevention (non-recurring).
Mental Health Community Groups: £60,000 funding for Community Groups supporting better 60
mental health in Perth and Kinross such as The Men's Shed, the Women's Wellbeing Club,
Mindspace and Andy's Man Club (non-recurring).
Live Active Leisure: Funding of £25,000 during 2025/26 for Live Active Leisure to continue 25
management of Community Halls while the Property Asset Transformation Review and
opportunities for Community Asset Transfer or Community Management take place (non-recurring).
Page 23 of 200

Page 24

APPENDIX (iii)
PERTH AND KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - SCOTTISH CONSERVATIVE & UNIONIST GROUP
CORPORATE PLAN 2023 - 2028 25/26  26/27  27/28
£'000  £'000  £'000
ADDITIONAL EXPENDITURE PROPOSALS
WORKING IN PARTNERSHIP WITH OUR COMMUNITIES
Tayside Contracts: Funding for a feasibility study to explore the opportunities for Tayside 50 
Contracts to carry out further services for Perth and Kinross Council such as grounds maintenance
services (non-recurring).
Litter Bins: Funding of £50,000 to replace litter bins which have reached the end of their useful life    50 
or to install additional litter bins where needed (non-recurring).
Grit Bins: Funding of £20,000 to expand the grit bin network and replace existing grit bins where     20
needed (non-recurring)
Community Investment Fund: Further funding of £400,000 in 2025/26 for devolved decision  400
making through the Community Investment Fund with the eligibility criteria to include inequalities,
increased energy costs and tackling poverty projects (non-recurring).
Community Councils: Additional funding of £15,000 to increase the maximum annual 15 
administration grant from £700 to £1,000. (recurring)
Bloom Groups and Friends of Cemeteries Groups etc - Additional funding of £70,000 for the 70 70
direct use of local Bloom Groups, Friends of Cemeteries Groups, Paths Groups and to support
and extend Litter Picking Groups (non-recurring).
Verge cutting: Funding of £65,000 in 2025/26, 2026/27 and 2027/28 to complete an additional 65  65     65
verge cutting exercise in Perth and Kinross to improve road safety for walkers, cyclists and
other road users (non-recurring).
Road Sign Visibility: Funding of £20,000 in 2025/26 and 2026/27 to carry out the clearance of 20 20
foliage around road signs and the cleaning of road signs, particularly on rural roads, to
improve their visibility and make our roads safer (non-recurring).
Rural Events Fund: Funding of £40,000 in 2025/26 to support local groups and organisations in 40 
rural areas with the organisation of events (non-recurring).
Armed Forces Covenant: Additional funding of £3,000 in 2025/26 to support plans 3
for commemorating the 80th anniversary of VE and VJ days in Perth and Kinross during 2025
(nonrecurring).
A93 Tourist Route: Funding to better market the A93 tourist route linking Perth to Royal Deeside 25
and Aberdeen, and promote Perth and our historic links with Scone Palace and the Stone of
Destiny, including better signage and visitor information thereby improving our tourism offer in
Perth and Kinross (non-recurring).
Page 24 of 200

Page 25

APPENDIX (iii)con.
PERTH AND KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - SCOTTISH CONSERVATIVE & UNIONIST GROUP
CORPORATE PLAN 2023 – 2028 25/26 26/27 27/28
£'000 £'000 £'000
ADDITIONAL EXPENDITURE PROPOSALS
Auchterarder Buses: Investment of £36,000 to assist with the operational costs of the 36
Auchterarder town bus service (recurring).
Community Transport: Funding of £20,000 in 2025/26 for the establishment of a Community 20
Transport initiative in the Carse of Gowrie (non-recurring).
TOTAL ADDITIONAL EXPENDITURE PROPOSALS 4,090 2,070 1,125
Page 25 of 200

Page 26

APPENDIX (iv)
PERTH AND KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - SCOTTISH CONSERVATIVE & UNIONIST GROUP
2025/26 COUNCIL TAX CALCULATION
2025/26
£'000 £'000
2025/26 Provisional Revenue Budget 499,273
Adjustments:
Reject Expenditure Pressures (Appendix i) (1,246)
Additional Budget Reductions/Income Proposals (Appendix ii) (615)
Additional Expenditure Proposals (Appendix iii) 4,090
2,229
2025/26Updated Provisional Revenue Budget 501,502
Funding
Total Revenue Funding (370,400)
Council Tax Second Home / Long Term Empty Properties (3,338)
Capital Grants (1,600)
Council Tax Single Person Discount (300)
Net Contribution from Reserves included in the Provisional Budget (3,112)
Contribution from Service Concession Scheme (6,000)
Contribution from earmarked Reserves included in this Amendment (2,815)
(387,565)
AMOUNT TO BE LEVIED FROM COUNCIL TAX 113,937
TAX BASE BAND D EQUIVALENT PROPERTIES (1.75% Non Collection) 75,157
FINAL 2025/26 BAND D COUNCIL TAX £ 1,515.98
INCREASE (2024/25 FINAL BAND D COUNCIL TAX £1,403.69) £ 112.29
PERCENTAGE INCREASE 8.0%
Excluding Water and Waste Water charges determined by Scottish Water.
Use of Earmarked Reserves
Transformation and Workforce Management 2,000
Anti-Poverty Measures 815
2,815
Page 26 of 200

Page 27

APPENDIX (v)
PERTH AND KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - SCOTTISH CONSERVATIVE & UNIONIST GROUP
2026/27 COUNCIL TAX CALCULATION
2026/27
£'000 £'000
2026/27 Provisional Revenue Budget 502,587
Recurring impact of 2025/26 proposals (1,720)
Adjustments:
Reject Expenditure Pressures (Appendix i) (275)
Additional Budget Reductions/Income Proposals (Appendix ii) (375)
Additional Expenditure Proposals (Appendix iii) 2,070
1,420
2026/27 Updated Provisional Revenue Budget 502,287
Funding
Total Revenue Funding (370,400)
Council Tax Second Home / Long Term Empty Properties (3,338)
Capital Grants (1,600)
Council Tax Single Person Discount (300)
Net Contribution to Reserves included in the Provisional Budget 2,418
Contribution from Service Concession Scheme (5,000)
Contribution to unearmarked Reserves included in this Amendment 217
(378,003)
AMOUNT TO BE LEVIED FROM COUNCIL TAX 124,284
TAX BASE BAND D EQUIVALENT PROPERTIES (1.75% Non Collection) 75,910
FINAL 2026/7 BAND D COUNCIL TAX £ 1,637.26
INCREASE (2025/26 FINAL BAND D COUNCIL TAX £1,515.98) £ 121.28
PERCENTAGE INCREASE 8.0%
Excluding Water and Waste Water charges determined by Scottish Water.
Page 27 of 200

Page 28

APPENDIX (v)
PERTH AND KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - SCOTTISH CONSERVATIVE & UNIONIST GROUP
2026/27 COUNCIL TAX CALCULATION
2026/27
£'000 £'000
2026/27 Provisional Revenue Budget 502,587
Recurring impact of 2025/26 proposals (1,720)
Adjustments:
Reject Expenditure Pressures (Appendix i) (275)
Additional Budget Reductions/Income Proposals (Appendix ii) (375)
Additional Expenditure Proposals (Appendix iii) 2,070
1,420
2026/27 Updated Provisional Revenue Budget 502,287
Funding
Total Revenue Funding (370,400)
Council Tax Second Home / Long Term Empty Properties (3,338)
Capital Grants (1,600)
Council Tax Single Person Discount (300)
Net Contribution to Reserves included in the Provisional Budget 2,418
Contribution from Service Concession Scheme (5,000)
Contribution to unearmarked Reserves included in this Amendment 217
(378,003)
AMOUNT TO BE LEVIED FROM COUNCIL TAX 124,284
TAX BASE BAND D EQUIVALENT PROPERTIES (1.75% Non Collection) 75,910
FINAL 2026/7 BAND D COUNCIL TAX £ 1,637.26
INCREASE (2025/26 FINAL BAND D COUNCIL TAX £1,515.98) £ 121.28
PERCENTAGE INCREASE 8.0%
Excluding Water and Waste Water charges determined by Scottish Water.
Page 28 of 200

Page 29

APPENDIX (vi)
PERTH AND KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - SCOTTISH CONSERVATIVE & UNIONIST GROUP
2027/28 COUNCIL TAX CALCULATION
2027/28
£'000 £'000
2027/28 Provisional Revenue Budget 515,226
Recurring impact of 2024/25 proposals (1,720)
Recurring impact of 2025/26 proposals (650)
Adjustments:
Reject Expenditure Pressures (Appendix i) (355)
Additional Budget Reductions/Income Proposals (Appendix ii) (700)
Additional Expenditure Proposals (Appendix iii) 1,125
70
2027/28 Updated Provisional Revenue Budget 512,926
Funding
Total Revenue Funding (370,400)
Council Tax Second Home / Long Term Empty Properties (3,338)
Capital Grants (1,600)
Council Tax Single Person Discount (300)
Net Contribution to Reserves included in the Provisional Budget 2,107
Contribution from Service Concession Scheme (4,000)
Contribution from unearmarked Reserves included in this Amendment (575)
(378,106)
AMOUNT TO BE LEVIED FROM COUNCIL TAX 134,820
TAX BASE BAND D EQUIVALENT PROPERTIES (1.75% Non Collection) 76,600
FINAL 2027/28 BAND D COUNCIL TAX £ 1,760.05
INCREASE (2026/27 FINAL BAND D COUNCIL TAX £1,637.26) £ 122.79
PERCENTAGE INCREASE 7.5%
Excluding Water and Waste Water charges determined by Scottish Water.
Page 29 of 200

Page 30

2nd Amendment (Councillor P Barrett and Bailie C McLaren)
The Council agrees:
1. To approve the 2025/26 Provisional Revenue Budget of £499.273 million as set out in
Appendix B of Report No. 25/36.
2. To approve the 2026/27 Provisional Revenue Budget of £502.587 million as set out in
Appendix B of Report No. 25/36.
3. To approve the 2027/28 Provisional Revenue Budget of £515.226 million as set out in
Appendix B of Report No. 25/36.
4. To approve the expenditure pressures as set out in Appendix C of Report No. 25/36.
5. To approve the additional budget reductions / additional income as set out in Appendix
C of Report 25/36 with the exception of those listed in Appendix (i).
6. To approve the additional budget reductions / additional income proposals as set out in
Appendix (ii) of this Revenue Budget Amendment.
7. To approve the additional expenditure proposals as set out in Appendix (iii) of this
Revenue Budget Amendment.
8. To approve an additional contribution from Reserves of £3.979 million in 2025/26 in
this Revenue Budget Amendment.
9. To approve an additional contribution to Reserves of £773,000 in 2026/27 in this
Revenue Budget Amendment.
10. To approve an additional contribution from Reserves of £1.294 million in 2027/28 in
this Revenue Budget Amendment.
11. To approve the Council Tax bases of 75,057 for 2025/26, 75,710 for 2026/27 and 76,300 for
2027/28.
12. To approve the contribution to Perth & Kinross Integration Joint Board of £106.133
million which is included in the 2025/26 Provisional Revenue Budget.
13. To approve the earmarked general fund balances set out in Appendix G with the
exception of the adjustments listed in Appendices (iv), (v) and (vi ).
14. To approve that uncommitted Reserves are maintained at a minimum of 2% to 4% of
the 2025/26 Provisional Revenue Budget which equates to £9.985 million to £19.970
million.
15. To approve a provision for the non-collection of Council Tax of 1.75% in 2025/26, 2026/27
and 2027/2816 
16. To approve the 2025/26 Final Revenue Budget of £504.358 million resulting in a Band D
Council Tax of £1,540.55 in 2025/26 as summarised in Appendix (iv) of this Revenue
Budget Amendment. This represents an 9.75% increase from the Council Tax Band D figure
for 2024/25.
17. To approve the 2026/27 Provisional Revenue Budget of £505.454 million resulting in an
indicative Band D Council Tax of £1,690.75 in 2026/27 as summarised in Appendix (v)
of this Revenue Budget Motion. This represents an indicative 9.75% increase from the
Council Tax Band D figure for 2025/26.
18. To approve the 2027/28 Provisional Revenue Budget of £516.215 million resulting in an
indicative Band D Council Tax of £1,800.65 in 2027/28 as summarised in Appendix (vi) of
this Revenue Budget Motion. This represents an indicative 6.5% increase from the Council
Tax Band D figure for 2026/27
Page 30 of 200

Page 31

PERTH AND KINROSS COUNCIL APPENDIX (i)
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - LIBERAL DEMOCRAT GROUP
Reference
Report No.
25/36
Page No.  25/26 26/27 27/28
BUDGET REDUCTIONS / ADDITIONAL INCOME REJECTED  £'000    £'000    £'000
Tackling poverty
Enabling our children and young people to achieve their full potential
Education and Learning (rephased) 51 90 (90)
TOTAL BUDGET REDUCTIONS / ADDITIONAL INCOME REJECTED 90 (90) 0
PERTH AND KINROSS COUNCIL APPENDIX (ii)
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - LIBERAL DEMOCRAT GROUP
25/26  26/27 27/28
ADDITIONAL BUDGET REDUCTIONS / INCOME PROPOSALS £'000 £'000 £'000
Enabling our Children and Young People to Achieve their full
potential Additional saving from home to school transport review 100 150
Organised to Deliver / Transformation 
Return on Artificial Intelligence investment 150 200
TOTAL ADDITIONAL BUDGET REDUCTIONS / INCOME PROPOSALS 0 250 350
Page 31 of 200

Page 32

PERTH AND KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - LIBERAL DEMOCRAT GROUP
CORPORATE PLAN 2023 - 2028
APPENDIX (iii)
25/26 26/27 27/28
£'000 £'000 £'000
900    900
TACKLING POVERTY
Financial Insecurity Fund/ Scottish Welfare Fund Augmentation
Anti-Poverty Action to provide early intervention and crisis prevention supports (FIF) and crisis
response (SWF) (non-recurring)
Welfare Rights Team Capacity
To reduce pressure on staff and assist in swift provision of advice (recurring)
47
Welfare Fund Team Capacity
To assist in distribution of Scottish Welfare Fund and Financial Insecurity Fund (recurring)
42
Tailored Employability Support for Priority Families
Expansion and scaling up of Future for Families programme for Rattray; Alyth; South Crieff
and Perth City: an additional key worker including on-costs and travel; 100 Self-Employment
Grants, and rent contribution for community space (delivery) (non-recurring)
370
Think Yes Tenancy Sustainment Fund for non-Council tenants
Continue to deliver early intervention and prevention to support private sector tenants,
administered by frontline homelessness team, to find solutions to avoid homelessness
(non-recurring)
70
Housing - Intensive Housing Support
To continue successful outreach service to support people with complex needs experiencing
homelessness. High fidelity approach delivered by lead/ peer support practitioners with specialist
alcohol and substance misuse training skills to move people into tenancies with intensive support
to sustain their home and maintain positive relationships with neighbours (non-recurring)
70
Rural Employment - Work Placement Programme
Funding to provide mentors for young people on placement in entry-level rural and farming jobs,
supported by LANTRA (awarding body for land-based industries) and other training partners.
(non-recurring)
40 40
Rural Employment - Rural Skills Academy
Establishing a rural skills academy to remove barriers to employment and enhance job-security
and regular employment in areas of need. Connecting students directly with local employers and
landowners. Guiding students towards job opportunities and vacancies. Focusing on unemployed
and underemployed young people, supported by PKC Skills and Employment Support Team.
(non-recurring)
66 34
Page 32 of 200

Page 33

PERTH AND KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - LIBERAL DEMOCRAT GROUP
APPENDIX (iii) con.
CORPORATE PLAN 2023 – 2028 25/26 26/27 27/28
£'000 £'000 £'000
ADDITIONAL EXPENDITURE PROPOSALS
TACKLING CLIMATE CHANGE AND SUPPORTING SUSTAINABLE PLACES
Green Living Fund 200
Funding for community-led projects to tackle climate change and biodiversity emergencies,
building on hugely successful Green Living Fund participatory budgeting (non-recurring, to come
from an earmarked reserve not previously identified) £200k in 25/26
Community transport 100
Expand support for communities to set up sustainable community transport arrangements
and local bus provision to meet local needs (non-recurring)
Think Yes fund for Community Resilience Groups 200
Maintain support for swift response to Community Resilience Groups to invest in equipment and
training to help residents and businesses to protect themselves from the impact of severe
weather events (non-recurring)
Ash Dieback 120 200
2 surveyors with GIS software and a vehicle to complete the Ash Dieback survey for
plan development, and £200k towards works on removal in year 2 (non-recurring)
Verge Cutting 146
Reinstatement of funding for two cuts a year rather than one (recurring)
Biodiversity Action Plans 171
Continue Biodiversity Villages, Neighbourhoods and Towns Initiative with project officer and
technical consultancy to develop Biodiversity Action Plans with local communities and Tayside
Biodiversity Partnership (non-recurring)
Greenspace Volunteer Groups 110 110
To provide an additional Co-Ordinator officer, insurance, training, materials and support for 118
existing volunteer groups and allow for more groups to be involved in improving a range of
greenspace assets in local communities. This would be aimed at making them more resilient to
climate change, improving biodiversity, creating a sense of community pride and identity and
providing opportunities to improve social, mental and physical wellbeing for a wide range of
people. (non recurring)
DEVELOPING A RESILIENT, STRONGER AND GREENER LOCAL ECONOMY
Community Led Social Enterprise for Social Care 50 50
Funding towards the establishment of community led charitable trust which will be the
infrastructure body providing care services within rural and remote communities through local
community-based development trusts (drawing strongly on the principles of the Boleskine model
in Highland). (non recurring)
Page 33 of 200

Page 34

PERTH AND KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - LIBERAL DEMOCRAT GROUP
CORPORATE PLAN 2023 - 2028
APPENDIX (iii)con.
25/26 26/27 27/28
£'000 £'000 £'000
Adapt your Property Fund
To continue the successful scheme facilitating conversion/ adaptation/ improvement of under-
used/vacant town and city centre commercial space for new commercial/ residential development
- borrowing capacity for a £300,000 investment in 2025/26. (recurring)
15
Youth employment opportunities for apprentices, graduates, etc.
Creation of employment opportunities for young people within Perth & Kinross Council through
modern apprenticeships and graduate trainee places (recurring)
180
ENABLING OUR CHILDREN AND YOUNG PEOPLE TO ACHIEVE THEIR FULL POTENTIAL
Outreach Pupil Support Resource
Outreach support for experienced practitioners to work alongside pupil support assistant workforce
across schools, sharing expertise and good practice and providing appropriate training. This will
enhance support where it is most needed, resulting in more young people being able to maintain a
full-time class placement and reduced disruption for all pupils through distressed or challenging
behaviours (non-recurring)
160
Play Area Maintenance
To maintain the number and quality of public play areas for children to access close to home, free
of charge, for their social, physical and mental wellbeing (non-recurring)
100
Instrumental Music Service
Reinstatement of 3.5 FTE Music Instructors to teach instrumental music in schools (recurring)
210
Summer Activity Clubs
Targeted provision of accessible activities, childcare and food for children 5-14 years from low-
income families during the summer holidays. (non-recurring)
50 50
SUPPORTING AND PROMOTING PHYSICAL AND MENTAL WELLBEING
Scams Officer
To enable the continuation of the above post, which works with vulnerable groups and
individuals in communities and Trading Standards and has supported over 357 people affected
by scams since 2022 (non-recurring)
50 50
Farmstrong
To enable Farmstrong to expand their work throughout Perth & Kinross to enhance the wellbeing
of those within the agriculture community, building resilience in rural communities through peer-to-
peer support, practical tips and scientifically backed resources to prevent suicide and improve
mental health (non-recurring)
10
Page 34 of 200

Page 35

PERTH AND KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - LIBERAL DEMOCRAT GROUP
CORPORATE PLAN 2023 - 2028
APPENDIX (iii)con.
25/26 26/27 27/28
£'000 £'000 £'000
PROTECTING AND CARING FOR OUR MOST VULNERABLE PEOPLE
RASAC Perth & Kinross
Additional Funding to support the vital work of this organisation (non-recurring)
30
Perthshire Women's Aid
Additional Funding to support the vital work of this organisation (non-recurring)
30
WORKING IN PARTNERSHIP WITH OUR COMMUNITIES
Care and Repair
Reinstate previous savings to service providing information, advice and practical assistance to
homeowners and private tenants who are elderly and/or have a disability to enable them to
repair or adapt their homes. Grants for works are means-tested, but advice and assistance is
provided to all homeowners and private tenants. (recurring)
300 100
Library Closure removal, CPK investment
Reinstatement of funding for Scone, Alyth, Auchterarder, Comrie and Birnam Libraries, and
maintaining operating hours of Perth Museum, Perth Art Gallery, and A K Bell Library (recurring)
449
Bloom Groups - Take a Pride in Perth and Kinross (TAPIPK)
reinstatement of cut to core funding for 50 local In Bloom groups (recurring)
25
Loch Leven Heritage Trail
To provide more user-friendly connections for all abilities to be able to access the trail from local
communities (non-recurring)
30 30
Perth Community Flood Aid
To support Perth Community Flood Aid group with localised improvements to reduce flood risk,
maintaining supplies for use in severe weather events, and provision of communications to
residents in accessible forms and across a wider area of the city
(non-recurring)
20
Community Investment Fund
Extension of funding for community-led projects to tackle persistent inequalities and Local
Outcome Improvement Plan priorities (non-recurring)
300
Community Asset Transfer Support Fund
Funding to support community asset transfer of buildings, including Community Halls (through
e.g. repairs, leverage matched/external funding) to reduce burden of surplus buildings on the
Council (non-recurring)
50
Community Halls
To enable Live Active Leisure to keep Community Halls open for a further year to allow time to
facilitate Community Asset Transfer Requests by local groups (non-recurring)
20
Page 35 of 200

Page 36

PERTH AND KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - LIBERAL DEMOCRAT GROUP
CORPORATE PLAN 2023 - 2028
APPENDIX (iii)con.
25/26 26/27 27/28
£'000 £'000 £'000
English for Speakers of Other Languages (ESOL) Provision
Provide a dedicated worker to support the delivery and co-ordination of ESOL within PK,
including asylum seekers and to target this resource more effectively to vulnerable groups in
communities. This role could significantly enhance the quality of life for non-native speakers,
promote social cohesion, and contribute to the overall development and prosperity of our
communities. (non-recurring)
41 41
Equalities Officer
Provide funds for this crucial role, supporting various community interest groups, the
growing number of cultural and equality events across P&K, and monitoring and delivering
on our commitments within the City of Sanctuary action plan (non-recurring)
53 53
P in the Park, Auchterarder
Support to project by Auchterarder Community Sports and Recreation (ACSR) Green Spaces
Working Group to provide access to a public toilet in Auchterarder Public Park (non-recurring)
30
Community Resilience and Vulnerable Persons Database
To supplement and support Community Resilience work, funding is required to develop a
database of vulnerable people living in P&K, to enable groups and officers to target support and
assistance effectively while enhancing the safety and wellbeing of at-risk individuals, ultimately
leading to stronger and more resilient communities (non-recurring)
25
Ditch Maintenance
Funding for ditch maintenance to enhance resilience of rural road network against severe weather
(non-recurring)
100
Investment in Local Roads
Additional borrowing capacity of £1m to invest in local road repairs and maintenance (recurring)
45
TOTAL ADDITIONAL EXPENDITURE PROPOSALS 4,995 1,658 30
Page 36 of 200

Page 37

PERTH AND KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - LIBERAL DEMOCRAT GROUP
APPENDIX (iv)
2025/26
£'000 £'000
2025/26 Provisional Revenue Budget 499,273
Adjustments:
Reject Budget Reductions / Additional Income (Appendix i) 90
Additional Expenditure Proposals (Appendix iii) 4,995
5,085
2025/26 Updated Provisional Revenue Budget 504,358
Funding
Total Revenue Funding (370,400)
Council Tax Second Home / Long Term Empty Properties (3,338)
Capital Grants (1,600)
Council Tax Single Person Discount (300)
Net Contribution from Reserves included in the Provisional Budget (3,112)
Contribution from Service Concession Scheme (6,000)
Contribution from earmarked Reserves included in this Amendment (3,979)
(388,729)
AMOUNT TO BE LEVIED FROM COUNCIL TAX 115,629
TAX BASE BAND D EQUIVALENT PROPERTIES (1.75% Non Collection) 75,057
FINAL 2025/26 BAND D COUNCIL TAX £ 1,540.55
INCREASE (2024/25 FINAL BAND D COUNCIL TAX £1,403.69) £ 136.86
PERCENTAGE INCREASE 9.75%
Excluding Water and Waste Water charges determined by Scottish Water.
Use of Earmarked Reserves
Transformation and Workforce Management 2,000
Anti-Poverty Measures 1,779
Green Living Fund 200
3,979
Page 37 of 200

Page 38

PERTH AND KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - LIBERAL DEMOCRAT
APPENDIX (v)
2026/27
£'000 £'000
2026/27 Provisional Revenue Budget 502,587
Recurring impact of 2025/26 proposals 1,549
Adjustments:
Reject Budget Reductions / Additional Income (Appendix i) (90)
Additional Budget Reductions / Income Proposals (Appendix ii) (250)
Additional Expenditure Proposals (Appendix iii) 1,658
1,318
2026/27 Updated Provisional Revenue Budget 505,454
Funding
Total Revenue Funding (370,400)
Council Tax Second Home / Long Term Empty Properties (3,338)
Capital Grants (1,600)
Council Tax Single Person Discount (300)
Net Contribution to Reserves included in the Provisional Budget 2,418
Contribution from Service Concession Scheme (5,000)
Contribution to unearmarked Reserves included in this Amendment 773
(377,447)
AMOUNT TO BE LEVIED FROM COUNCIL TAX 128,007
TAX BASE BAND D EQUIVALENT PROPERTIES (1.75% Non Collection) 75,710
FINAL 2026/27 BAND D COUNCIL TAX £ 1,690.75
INCREASE (2025/26 FINAL BAND D COUNCIL TAX £1,540.55) £ 150.20
PERCENTAGE INCREASE 9.75%
Excluding Water and Waste Water charges determined by Scottish Water.
Page 38 of 200

Page 39

PERTH AND KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - LIBERAL DEMOCRAT
APPENDIX (vi)
2027/28
£'000 £'000
2027/28 Provisional Revenue Budget 515,226
Recurring impact of 2025/26 proposals 1,549
Recurring impact of 2026/27 proposals (240)
Adjustments:
Additional Budget Reductions / Income Proposals (Appendix ii) (350)
Additional Expenditure Proposals (Appendix iii) 30
(320)
2027/28 Updated Provisional Revenue Budget 516,215
Funding
Total Revenue Funding (370,400)
Council Tax Second Home / Long Term Empty Properties (3,338)
Capital Grants (1,600)
Council Tax Single Person Discount (300)
Net Contribution to Reserves included in the Provisional Budget 2,107
Contribution from Service Concession Scheme (4,000)
Contribution from unearmarked Reserves included in this Amendment (1,294)
(378,825)
AMOUNT TO BE LEVIED FROM COUNCIL TAX 137,390
TAX BASE BAND D EQUIVALENT PROPERTIES (1.75% Non Collection) 76,300
FINAL 2027/28 BAND D COUNCIL TAX £ 1,800.65
INCREASE (2026/27 FINAL BAND D COUNCIL TAX £1,690.75) £ 109.90
PERCENTAGE INCREASE 6.50%
Excluding Water and Waste Water charges determined by Scottish Water.
Page 39 of 200

Page 40

3rd Amendment (Councillor C Stewart and Bailie R Brock)
The Council agrees:
1. To approve the 2025/26 Provisional Revenue Budget of £499.273 million as set out in
Appendix B of Report No. 25/36.
2. To approve the 2026/27 Provisional Revenue Budget of £502.587 million as set out in
Appendix B of Report No. 25/36.
3. To approve the 2027/28 Provisional Revenue Budget of £515.226 million as set out in
Appendix B of Report No. 25/36.
4. To approve the expenditure pressures as set out in Appendix C of Report No. 25/36 with
the exception of those listed in Appendix (i).
5. To approve the budget reductions / additional income as set out in Appendix C of
Report No. 25/36 with the exception of those listed in Appendix (ii).
6. To approve the additional budget reductions / additional income listed in Appendix (iii)
of this Revenue Budget Amendment.
7. To approve the additional expenditure proposals as set out in Appendix (iv) of this
Revenue Budget Amendment.
8. To approve an additional contribution from Reserves of £3.604 million in 2025/26 in
this Revenue Budget Amendment.
9. To approve an additional contribution to Reserves of £3.681 million in 2026/27 in this
Revenue Budget Amendment.
10. To approve an additional contribution from Reserves of £2.681 million in 2027/28
in this Revenue Budget Amendment.
11. To approve the Council Tax bases of 75,157 for 2025/26, 75,910 for 2026/27 and 76,600
for 2027/28.
12. To approve the contribution to Perth & Kinross Integration Joint Board of £106.133
million which is included in the 2025/26 Provisional Revenue Budget.
13. To approve the earmarked general fund balances set out in Appendix G with the
exception of the adjustments listed in Appendices (v), (vi) and (vii).
14. To approve that uncommitted Reserves are maintained at a minimum of 2% to 4%
of the 2025/26 Provisional Revenue Budget which equates to £9.985 million to
£19.970 million.
15. To approve a provision for the non-collection of Council Tax of 1.75% in 2025/26,
2026/27 and 2027/28.
16. To approve the 2025/26 Final Revenue Budget of £501.763 million resulting in a Band
D Council Tax of £1,508.96 in 2025/26 as summarised in Appendix (v) of this Revenue
Budget Amendment. This represents a 7.5% increase from the Council Tax Band D
figure for 2024/25.
17 To approve the 2026/27 Provisional Revenue Budget of £497,675million resulting in an
indicative Band D Council Tax of £1,622.13 in 2026/27 as summarised in Appendix (vi)
of this Revenue Budget Amendment. This represents an indicative 7.5% increase from
the Council Tax Band D figure for 2025/26.
18. To approve the 2027/28 Provisional Revenue Budget of £508.195 million resulting in an
indicative Band D Council Tax of £1,670.79 in 2027/28 as summarised in Appendix (vii)
of this Revenue Budget Amendment. This represents an indicative 3.0% increase from
the Council Tax Band D figure for 2026/27
Page 40 of 200

Page 41

PERTH & KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - INDEPENDENT
EXPENDITURE PRESSURES REJECTED
Tackling climate change and supporting sustainable
Reference
Report No.
25/36 
Page No.
49
25/26
£'000
1,839
APPENDIX (i)
26/27 27/28
£'000 £'000
(475) (356)
Enabling our children and young people to achieve their full potential
Teachers Slippage Target 51 552
Home to School Transport 51 420 255 240
Devolved School Management Cleaning Budgets 51 150
Working in partnership with our communities 
Waste Disposal - Contract Inflation 55 140
Public Transport Tendered Services - Contract Inflation 56 185
Council Wide - Fleet Loan Charges (partial) 56 168 238 178
Organised to Deliver / Transformation 
AI Strategic Programme 58 500 250
Procurement Capacity 59 25
MIS Saving 59 300
TOTAL EXPENDITURE PRESSURES REJECTED 3,929 293 387
PERTH & KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - INDEPENDENT APPENDIX (ii)
Reference
Report No.
25/36
Page No.  25/26 26/27 27/28
BUDGET REDUCTIONS / ADDITIONAL INCOME REJECTED £'000  £'000  £'000
Working in partnership with our communities
Refuse Collection - Garden Waste Permit Charge 67 65 68
TOTAL BUDGET REDUCTIONS / ADDITIONAL INCOME REJECTED 0 65 68
Page 41 of 200

Page 42

PERTH & KINROSS COUNCIL APPENDIX (iii)
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - INDEPENDENT
25/26  26/27 27/28
ADDITIONAL BUDGET REDUCTIONS / INCOME PROPOSALS £'000 £'000 £'000
Tackling climate change and supporting sustainable places
Reduction in tree-planting function 52
Developing a resilient, stronger and greener economy
Reduction to Development Plan function 200 200
Enabling our children and young people to achieve their full potential 
Introduce charging from September for use of minibuses by schools and
community groups 38 50 50 
Increase breakfast club charge from £2 to £3 to support expansion of Breakfast
Clubs to schools that don't have them. 40
Recharge 100% of SERCC annual fee to schools' DSM budget 22
Partially absorb DSM underspend 167
Efficiencies in Perth Secondary Schools 500
Tayside Contracts - savings target from productivity/efficiency 100 100 100
Supporting and promoting physical and mental wellbeing
Reduction in Capital Programme 90 1,390
Working in partnership with our communities
Expansion of Perth City parking permit zone - income to be applied to public
transport costs 100 
Charge for Broxden Park and Ride (with a free ticket to City Centre) - income to
be applied to public transport costs 200
Redesign of Community Learning and Development function 220 221
Allow purchase of permits for more than 2 garden waste bins 39 11
Organised to Deliver / Transformation
Pullar House - income target from attracting further external organisations 50 100 100
Increase in non-teaching slippage target by 0.5% 590
Cease membership of CoSLA 90
Cease membership of Scotland Excel 115
Artificial Intelligence Project - target for savings generated by the AI Project 50 200
Procurement Savings - savings target from increased procurement capacity 100
Business improvement external consultancy - savings target 250  500
TOTAL ADDITIONAL BUDGET REDUCTIONS / INCOME PROPOSALS 1,858  2,927  1,250
Page 42 of 200

Page 43

PERTH & KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - INDEPENDENT
CORPORATE PLAN 2023 - 2028
ADDITIONAL EXPENDITURE PROPOSALS
Developing a resilient, stronger and greener local economy
Rural Commercial Property Investment Programme - Initial funding to support the
creation of new commercial units in rural communities. Should the units be sold, then the
proceeds can be reinvested to create more units, or should the units be let, then the
resultant income can be used to finance more units. (non-recurring)
25/26
£'000
2,000
APPENDIX (iv)
26/27 27/28
£'000 £'000
Micro business grants scheme - restart of a successful scheme from previous years to
help local businesses access funding for growth. (non-recurring) 1,000
Small business interest-free loans scheme - to be set up during 2025/26 to commence
from April 2026, potentially administered by an external organisation (non-recurring) 1,000
Adapt your property - continuation of the successful scheme from previous years to help
bring property back into use (non-recurring) 500
Feasibility study into new Ballinluig/Stanley/Bertha Park Integrated Transport Hub -
Railway Station/Bus Interchange/Park&Ride to help our commuities access more
environmentally friendly transport options. (non-recurring) 60
Kinross Railway - funding for a feasibility study into the reintroduction of a railway line and
station to Kinross. (non-recurring) 50
Enabling our children and young people to achieve their full potential
Instrumental Music Service - reversal of previously agreed cut to staffing budget and
reversal of new charges for central groups and music camps as we know how important
these services are to our young people (recurring) 270
Improve referral and diagnosis pathway in Educational Psychology service
(non-recurring, from transformation reserve) 100
Expand Breakfast Clubs and After-School Clubs - this funding will support the rollout of
new Breakfast Clubs and After-School Clubs in schools that currently don't have them
(recurring) 80
Page 43 of 200

Page 44

PERTH & KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - INDEPENDENT
CORPORATE PLAN 2023 - 2028
ADDITIONAL EXPENDITURE PROPOSALS
Supporting and promoting physical and mental wellbeing
Access to Curling Initiative - funding to support increased participation in curling by young
people. (non-recurring)
2
5
/
2
6
£'
0
0
0
APPENDIX (iv)con.
26/27 27/28
£'000 £'000
LAL - Community Halls - funding to support the ongoing operation of community halls while
local groups explore the possibility of Community Asset Transfers. (non-recurring) 3
0CPK - Rural Library Funding - funding to permanently reverse the proposed closures of
Comrie, Scone, Alyth, Birnam and Auchterarder libraries. (recurring) 1
9CPK - funding to maintain services and opening hours of Perth Art Gallery and Perth
Museum (recurring) 2
0
Working with communities
Community Investment Fund - funding to support local community projects. (non-recurring)
3Community Councils - Increase in administration top-up grant to £1,000 to recognise the
important work undertaken by local community councils and reflect they have not had an
uplift in funding in recent years. (recurring) 1
3
Bloom/Path/Friends of Cemeteries Groups - this funding reverses the prior cut and triples
the funding available to local groups for materials, etc., from £18k to 54k, recognising the
important work they do to keep our towns and villages looking their best. (recurring) 3
6
Rural Events Fund - funding to support rural events, recognising the important role they
play in rural economic and community development. Introduction of revised application
criteria so that existing events can also apply. (recurring) 5
0
Garden Maintenance - to support increased uptake of PKC maintenance by local residents
(non-recurring) 1
0
Community Asset Transfers - additional funding to support the transfer of Council owned
assets to community groups by providing funding for remedial physical works to bring
buildings up to an adoptable standard. (non-recurring) 2
5
0Combatting Financial Scams - funding to maintain existing officer resource to help stop
elderly and vulnerable residents from becoming victims of financial scams. (recurring) 5
0
New grit bins - funding to support new grits bins in areas that don't currently have them to
help residents with community winter resilience. (non-recurring) 2
0New Bus Shelters/Stops - funding to install new bus shelters/stops and associated
infrastructure eg. dropped kerbs, raised kerbs, etc. (non-recurring) 1
2Unadopted Roads - funding to top up the unadopted roads budget to assist communities in
bringing unadopted roads up to an adoptable standard. (non-recurring) 1
0
Road Safety - external resource to assist with backlog of projects (non-recurring) 2
5
Page 44 of 200

Page 45

PERTH & KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - INDEPENDENT
CORPORATE PLAN 2023 - 2028
ADDITIONAL EXPENDITURE PROPOSALS
25/26
£'000
APPENDIX (iv)con.
26/27 27/28
£'000 £'000
Improving quality and provision of car parks - funding to improve and expand carparking
in Perth & Kinross. (non-recurring from car park trading account) 300
Road Improvements - funding to support repairs to the road network ie. potholes (non-
recurring from car park reserve 2526 only) 1,000 1,000 1,000
Installation of flood barriers on A923 and B954 at River Isla crossings (non-recurring) 22
Milnathort Traffic Signal Crossings - funding for new traffic signals in Milnathort providing
safe crossing points for school children. (non-recurring) 130
New Road Reclamation Programme - funding for a programme to reclaim existing roads
and pavements currently covered by overgrown verges. This programme will make rural
routes safer by increasing the carriageway width for pedestrians, cyclists, horse-riders and
vehicles. (non-recurring)
400 400 400
Grass-cutting - recurring funding to reverse previously agreed reduction in grass cutting.
(recurring) 350
Grass-cutting - one off funding required to reverse previously agreed reduction in grass
cutting. (non-recurring) 180
Non-Statutory/Discretionary Charges - funding to keep grass pitches free for local groups.
(recurring) 21
Crieff Regeneration Funding - redirection of previously agreed grant to Crieff Community
Trust for staffing to support regeneration efforts in Crieff. Funding to be ringfenced for
regeneration initiatives in Crieff by local groups. (non-recurring)
0 0
Carse Early Bus - funding to restore the early morning bus service from Errol to Perth to
support workers. (recurring) 13
Page 45 of 200

Page 46

PERTH & KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - INDEPENDENT
APPENDIX (iv)con.
CORPORATE PLAN 2023 - 2028 25/26 26/27 27/28
£'000 £'000 £'000
ADDITIONAL EXPENDITURE PROPOSALS
Organised to Deliver
Every Penny Counts Initiative - funding to support the implementation of suggestions by
Council staff to improve the efficiency and operation of Council services. (non-
recurring, funded from transformation reserve) 100
Artificial Intelligence Project - funding to support exploration of opportunities offered by
AI to improve Council services. (non-recurring, funded from transformation reserve) 250
Business Improvement - funding to provide external consultancy to support
transformation and Council efficiency. (non-recurring, funded from transformation reserve) 100 100
Contribution to Capital Fund - increase by another 0.25% of Council Tax on a
recurring basis to pay off Council debt faster and reduce the burden being passed
onto future generations. (recurring) 250 250
TOTAL ADDITIONAL EXPENDITURE PROPOSALS 8,277  2,750 1,950
Page 46 of 200

Page 47

PERTH & KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - INDEPENDENT
APPENDIX (v)
2025/26
£'000 £'000
2025/26 Provisional Revenue Budget 499,273
Adjustments:
Reject Expenditure Pressures (Appendix i) (3,929)
Additional Budget Reductions / Income Proposals (Appendix iii) (1,858)
Additional Expenditure Proposals (Appendix iv) 8,277
2,490
2025/26 Updated Provisional Revenue Budget 501,763
Funding
Total Revenue Funding (370,400)
Council Tax Second Home / Long Term Empty Properties (3,338)
Capital Grants (1,600)
Council Tax Single Person Discount (300)
Net Contribution from Reserves included in the Provisional Budget (3,112)
Contribution from Service Concession Scheme (6,000)
Contribution to unearmarked Reserves included in this Amendment 40
Contribution from earmarked Reserves included in this Amendment (3,644)
(388,354)
AMOUNT TO BE LEVIED FROM COUNCIL TAX 113,409
TAX BASE BAND D EQUIVALENT PROPERTIES (1.75% Non Collection) 75,157
FINAL 2025/26 BAND D COUNCIL TAX £ 1,508.96
INCREASE (2024/25 FINAL BAND D COUNCIL TAX £1,403.69) £ 105.27
PERCENTAGE INCREASE 7.5%
Excluding Water and Waste Water charges determined by Scottish Water.
Use of Earmarked Reserves
Anti-Poverty Measures 1,000
Transformation and Workforce Management 1,644
Car Park Trading Account 1,000
3,644
Page 47 of 200

Page 48

PERTH & KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - INDEPENDENT
APPENDIX (vi)
2026/27
£'000 £'000
2026/27 Provisional Revenue Budget 502,587
Recurring impact of 2025/26 proposals (4,507)
Adjustments:
Reject Expenditure Pressures (Appendix i) (293)
Reject Budget Reductions / Additional Income (Appendix ii) 65
Additional Budget Reductions / Income Proposals (Appendix iii) (2,927)
Additional Expenditure Proposals (Appendix iv) 2,750
(405)
2026/27 Updated Provisional Revenue Budget 497,675
Funding
Total Revenue Funding (370,400)
Council Tax Second Home / Long Term Empty Properties (3,338)
Capital Grants (1,600)
Council Tax Single Person Discount (300)
Net Contribution to Reserves included in the Provisional Budget 2,418
Contribution from Service Concession Scheme (5,000)
Contribution to unearmarked reserves included in this Amendment 4,781
Contribution from earmarked Reserves included in this Amendment (1,100)
(374,539)
AMOUNT TO BE LEVIED FROM COUNCIL TAX 123,136
TAX BASE BAND D EQUIVALENT PROPERTIES (1.75% Non Collection) 75,910
FINAL 2026/27 BAND D COUNCIL TAX £ 1,622.13
INCREASE (2025/26 FINAL BAND D COUNCIL TAX £1,508.96) £ 113.17
PERCENTAGE INCREASE 7.5%
Excluding Water and Waste Water charges determined by Scottish Water.
Use of Earmarked Reserves
Anti-Poverty Measures 1,000
Transformation 100
1,100
Page 48 of 200

Page 49

PERTH & KINROSS COUNCIL
26 FEBRUARY 2025
REVENUE BUDGET 2025/26, 2026/27 & 2027/28
REVENUE BUDGET AMENDMENT - INDEPENDENT
APPENDIX (vii)
2027/28
£'000 £'000
2027/28 Provisional Revenue Budget 515,226
Recurring impact of 2025/26 proposals (4,507)
Recurring impact of 2026/27 proposals (2,905)
Adjustments:
Reject Expenditure Pressures (Appendix i) (387)
Reject Budget Reductions / Additional Income (Appendix ii) 68
Additional Budget Reductions / Income Proposals (Appendix iii) (1,250)
Additional Expenditure Proposals (Appendix iv) 1,950
381
2027/28 Updated Provisional Revenue Budget 508,195
Funding
Total Revenue Funding (370,400)
Council Tax Second Home / Long Term Empty Properties (3,338)
Capital Grants (1,600)
Council Tax Single Person Discount (300)
Net Contribution to Reserves included in the Provisional Budget 2,107
Contribution from Service Concession Scheme (4,000)
Contribution from unearmarked Reserves included in this Amendment (2,381)
Contribution from earmarked Reserves included in this Amendment (300)
(380,212)
AMOUNT TO BE LEVIED FROM COUNCIL TAX 127,983
TAX BASE BAND D EQUIVALENT PROPERTIES (1.75% Non Collection) 76,600
FINAL 2027/28 BAND D COUNCIL TAX £ 1,670.79
INCREASE (2026/27 FINAL BAND D COUNCIL TAX £1,622.13) £ 48.66
PERCENTAGE INCREASE 3.0%
Excluding Water and Waste Water charges determined by Scottish Water.
Use of Earmarked Reserves
Car Park Trading Account 300
Page 49 of 200

Page 50

There followed a recess, and the meeting reconvened at 2.24pm.
Note:  The Mover and Seconder of the Motion agreed to make the following adjustments /
clarifications in relation to the Motion:
 The funding for biodiversity to include funding for biodiversity villages;
 The funding for community resilience to include £20,000 for Perth Community Flood
Aid;
 Additional funding to be received from the Scottish Government for ASL to
contribute towards proposals in other budgets.
From the Liberal Democrat Group:
 £70,000 (2025/26) non-recurring funding towards Think Yes Tenancy Sustainment
for non-Council Tenants;
 £40,000 (2025/26) and £40,000 (2026/27) non-recurring funding towards Rural
Employment – Work Placement Programme;
 £66,000 (2025/26) and £34,000 (2026/27) non-recurring funding towards Rural
Employment – Rural Skills Academy;
 A non-recurring funding of £200,000 towards Ash Dieback (2026/27);
 £30,000 (2026/27) and £30,000 (2027/28) non-recurring funding towards Loch
Leven Heritage Trail;
 £41,000 (2025/26) and £41,000 (2026/27) non-recurring funding towards English of
Speakers of Other Languages (ESOL) provision;
 £53,000 (2025/26) and £53,000 (2026/27) non-recurring funding towards an
Equalities Officer;
 £30,000 (2025/26) non-recurring funding towards P in the Park;
 Non-recurring funding of £50,000 (2025/26) and £50,000 (2026/27) towards a
Scams Prevention Officer;
 £370,000 (2025/26) non-recurring funding towards Tailored Employment;
 £50,000 (2025/26) non-recurring funding towards Ditch Maintenance.
From the Independent Group:
 £22,000 (2025/26) non-recurring funding towards Coutiie Bridge;
 £130,000 (2025/26) non-recurring funding towards Milnathort Road Traffic;
 £50,000 (2025/26) non-recurring funding towards Rural Events;
 Redirection of funding from Crieff Community Trust to regeneration initiatives in
Crieff - £40,000 (2025/26) and £40,000 (2026/27);
 £25,000 (2025/26) non-recurring funding towards Civic Events.
From the Conservative Group:
 £3,000 (2025/26) non-recurring funding towards Armed Forces Covenant.
Page 50 of 200

Page 51

2025/26 2026/27 2027/28
Think Yes Tenancy
Sustainment for non-
Council Tenants
70,000 - - Non-recurring
Rural Employment –
Work Placement
Programme
40,000 40,000 - Non-recurring
Rural Employment –
Rural Skills Academy
66,000 34,000 - Non-recurring
Ash Dieback - 200,000 Non-recurring
Loch Leven Heritage
Trust
- 30,000 30,000 Non-recurring
English for Speakers of
Other Languages (ESOL)
provision
41,000 41,000 - Non-recurring
Equalities Officer 53,000 53,000 - Non-recurring
P in the Park 30,000 - - Non-recurring
Scams Prevention Officer 50,000 50,000 Non-recurring
Tailored Employment 370,000 - - Non-recurring
Ditch Maintenance 50,000 - - Non-recurring
Couttie Bridge 22,000 - - Non-recurring
Milnathort Road Traffic 130,000 - - Non-recurring
Rural Events 50,000 Non-recurring
Redirection of funding
from Crieff Community
Trust to regeneration
initiatives in Crieff
40,000 40,000 -
Civic Events 25,000 - - Non-recurring
Armend Forces Covenant 3,000 - - Non-recurring
Anti-Poverty Earmarked
Reserves
690,000 218,000 0
Unearmarked Reserves 310,000 230,000 30,000
1,000,000 448,000 30,000
Page 51 of 200

Page 52

In accordance with Standing Order 21.6, a roll call vote was taken.
5 Membersvoted for the 2nd Amendment as follows:
Bailie C McLaren, Councillors L Barrett, P Barrett and W Robertson and A Watt.
5 Members voted for the 3rd Amendment as follows:
Provost X McDade, Bailies A Bailey and R Brock, Councillors D Cuthbert and C Stewart.  
30 Members abstained as follows:
Depute Provost A Parrott, Bailies C Ahern and M Williamson, Councillors K Allan, H
Anderson, B Brawn, S Carr, A Chan, S Donaldson, E Drysdale, J Duff, A Forbes, M Frampton,
N Freshwater, K Harvey, D Illingworth, I James, N Khogali, G Laing, I MacPherson, C Mair, I
Massie, S McCole, T McEwan, J Rebbeck, C Shiers, F Smith, G Stewart, R Watters and J
Welch.
In terms of Standing Order 21.2, Provost X McDade exercised his casting vote in favour
of the 3rd Amendment.
The 3rd Amendment was therefore carried and became the 2nd Amendment.  This was then put
against the 1st Amendment.
13 Members voted for the 1st Amendment as follows:
Bailie C Ahern, Councillors K Allan, H Anderson, B Brawn, A Chan, J Duff, A Forbes, N
Freshwater, D Illingworth, I James, N Khogali, C Shiers and F Smith.
5 Members voted for the 2nd Amendment as follows:
Provost X McDade, Bailies A Bailey and R Brock, Councillors D Cuthbert and C Stewart.  
22 Members abstained as follows:
Depute Provost A Parrott, Bailies C McLaren and M Williamson, Councillors L Barrett, P
Barrett, S Carr, S Donaldson, E Drysdale, M Frampton, K Harvey, G Laing, I MacPherson, C
Mair, I Massie, S McCole, T McEwan, J Rebbeck, W Robertson, G Stewart, A Watt, R Watters
and J Welch.
The 1st Amendment was therefore carried and became the substantive Amendment
which was then put against the Revised Motion.
26 Members voted for the Revised Motion as follows:
Provost X McDade, Depute Provost A Parrott, Bailies R Brock, C McLaren and M
Williamson, Councillors L Barrett, P Barrett, S Carr, D Cuthbert, S Donaldson, E Drysdale, M
Frampton, K Harvey, G Laing, I MacPherson, C Mair, I Massie, S McCole, T McEwan, J
Rebbeck, W Robertson, C Stewart, G Stewart, A Watt, R Watters and J Welch.
Page 52 of 200

Page 53

13 Members voted for the Amendment as follows:
Bailie C Ahern, Councillors K Allan, H Anderson, B Brawn, A Chan, J Duff, A Forbes, N
Freshwater, D Illingworth, I James, N Khogali, C Shiers and F Smith.
1 Member abstained as follows:
Bailie A Bailey.
Resolved:
In accordance with the Revised Motion.
There followed a recess, and the meeting reconvened at 4.12pm.
5. Strategic Investment and Composite Capital Budget Update 2025/26 to 2030/31
There was submitted a report by Strategic Lead – Finance and Business Support (25/37)
outlining the proposed budget for the Composite Capital Programme for the six years from
2025/26 to 2030/31.
Resolved:
(i) The adjustments to the existing Capital Budget from 2025/26 to 2029/30, set out in
Section 5, be approved.
(ii) The estimated new capital resources available for the year 2030/31, as detailed at
Section 6 of the report and included in Appendix I, be approved.
(iii) The proposed Composite Capital Budget for 2030/31, outlined in Section 6, be
approved.
(iv) The six-year Composite Capital Budget for 2025/26 to 2030/31, as shown at
Appendix II of the report, be approved.
Note:  In terms of Standing Order 22.1, Bailie Bailey requested that his dissent to the
decision be recorded.
Page 53 of 200

Page 54

Page 54 of 200

Page 55

PERTH AND KINROSS COUNCIL
Minute of hybrid meeting of Perth and Kinross Council held in the Council Chamber,
2 High Street, Perth on Wednesday 5 March 2025 at 10.00am.
Present: Provost X McDade, Depute Provost A Parrott, Bailies C Ahern, B Bailey,
R Brock and C McLaren;  Councillors K Allan, H Anderson, L Barrett, P Barrett, B
Brawn, S Carr, A Chan, D Cuthbert, S Donaldson, E Drysdale, J Duff, A Forbes, M
Frampton, N Freshwater, K Harvey, D Illingworth, I James, N Khogali, G Laing, I
MacPherson, C Mair, I Massie, S McCole, T McEwan, J Rebbeck, W Robertson, C
Shiers, F Smith, C Stewart, G Stewart, A Watt, R Watters and J Welch.
In Attendance: T Glen, Chief Executive; C Mailer, Depute Chief Executive; L
Simpson, Strategic Lead – Legal and Governance; S Walker, Strategic Lead –
Finance and Business Support; S Merone, Strategic Lead – Economy, Development
and Planning; J Jennings (Finance and Business Support); B Murray (Economy,
Development and Planning); S Hendry, A Brown and M Pasternak (all Legal and
Governance).
Apology for Absence: Bailie M Williamson.
Provost X McDade, Presiding.
Provost led on Items 1-8 and 11-15, and Depute Provost led on Items 9 and 10.
1. Welcome and Apologies
Provost McDade welcomed all those present to the meeting and an apology
was noted as above.
2. Declarations of Interest
There were no declarations of interest in terms of the Councillors’ Code of
Conduct.
3. Urgent Business Item
In terms of Standing Order 9.3 (b), the Provost confirmed that he was
accepting the following motion as an urgent item of business on the grounds that
there had been a material change in the policy matter around the topic since the
deadline for motions had passed.
3(ii)
Page 55 of 200

Page 56

Motion by Councillor S Carr and Bailie C Ahern
In light of recent events in the United States, that prompted the responses of
support for Ukraine from European leaders, Council reaffirms our continued
commitment to supporting the Ukrainian communities within Perth and
Kinross, at a time when recent actions undermine the ongoing struggle
against Russian aggression and the defence of Ukraine’s sovereign integrity.
Council also acknowledges with appreciation the significant work of Council
officers in their support of our Ukrainian families within Perth and Kinross,
across a wide range of crucial services, and providing the aid and assistance
they need at a time where many Ukrainians are seriously concerned about the
future of their country.
Council urges the Scottish Government to continue its unwavering support for
displaced Ukrainians, and to provide reassurances to them during this
worrying time of uncertainty.
Council urges the United Kingdom Government to be steadfast in its
commitment to supporting Ukraine and, in partnership with Europe, continues
to provide the aid and military assistance that Ukraine needs to defend itself.  
Resolved:
In accordance with the Motion.
4. Minute of Perth and Kinross Council of 4 December 2024 for Approval
The minute of meeting of Perth and Kinross Council of 4 December 2024 was
submitted and approved as a correct record.
5. Outstanding Business Statement
The Outstanding Business Statement was noted, and it was agreed to remove
the completed actions.
6. Treasury and Investment Strategy and Prudential Indicators 2025/26 –
2030/31
There was submitted a report by Strategic Lead – Finance and Business
Support (25/39) detailing the Council’s proposed Treasury Strategy for 2025/26 to
2030/31, the Investment and Property Strategy for 2025/26 and Prudential Indicators
for 2025/26 to 2030/31.
Page 56 of 200

Page 57

Resolved:
(i) The contents of the report be noted.
(ii) The 6-year Treasury Strategy for 2025/26 to 2030/31, as detailed in the
report, which is submitted in accordance with the Council’s approved
Treasury Management Practices (TMP), be approved.
(iii) The Permitted Investments and Investment Strategy for 2025/26,
outlined at Section 7 and detailed at Appendix III of the report, be
approved.
(iv) The Property Investment Strategy for 2025/26, outlined at Section 8 and
detailed at Appendix IV of the report, be approved.
(v) The proposed Prudential Indicators for 2025/26 to 2030/31, including
increasing the Council’s Authorised Limit for Borrowing to £1.3 billion, as
outlined at Section 11 and detailed at Appendix V of the report, be
approved.
7. Perth and Kinross Local Development Plan 3 Evidence Report
There was submitted a report by Strategic Lead – Economy, Development
and Planning (25/40) asking the Council to (1) approve the Perth and Kinross Local
Development Plan 3 (LDP3) Evidence Report and (2) delegate authority to the
Strategic Lead (Economy, Development and Planning) to submit the plan to the
Scottish Ministers for the Gate Check process. The LDP3 will have an important role
in delivering the spatial planning aspects of the Corporate Plan 2022-2027,
particularly contributing to the priorities of ‘tackling climate change and supporting
sustainable places’ and ‘developing a resilient, stronger and greener economy’.
Resolved:
(i) The LDP3 Evidence Report be approved and authority be delegated to
the Strategic Lead (Economy, Development and Planning) to submit it to
Scottish Ministers who will appoint a Reporter from the Department for
Planning and Environmental Appeals (DPEA) for review.
(ii) Authority be delegated to the Strategic Lead (Economy, Development
and Planning) to make any necessary minor changes or updates to the
Evidence Report thereafter, prior to its submission to Scottish Ministers.
8. Updates to Scheme of Administration
Resolved:
The proposed update to the Scheme of Administration, as set out on the
agenda, be agreed.
Page 57 of 200

Page 58

9. Appointments to Committees/Outside Bodies
Resolved:
 Councillor Colin Stewart to replace Provost Xander McDade on the Affordable
Housing Member/Officer Working Group.
 Bailie Clare McLaren to replace Councillor Sheila McCole as the
representative on the Friends of Cognac Association.
 Councillor Stewart Donaldson to replace Councillor Sheila McCole as the
Perth & Kinross representative on the Scotland Excel Joint Committee.
 Councillor Ken Harvey to replace Councillor Steven Carr on the Perth and
Kinross Sport Council.
 It be agreed to reduce the number of elected members on the Employees
Joint Consultative Committee from 4 to 3.
10. Elected Members Briefing Notes
Resolved:
The Elected Members Briefing Notes, issued since the previous Council
meeting and as set out on the agenda, be noted.
Page 58 of 200

Page 59

Motion by Bailie C Ahern and Councillor J Duff
The 300th Anniversary of the Black Watch
That this Council celebrates the tercentenary of the origins of The Black Watch,
understanding that, in 1725, six companies were raised at the request of General
George Wade and formed the Highland Watches to police the Highlands in the
aftermath of the 1715 Jacobite Rebellion, with a further four companies raised in
1739 to form the Regiment of the Line. The companies were referred to in Gaelic as
Am Freiceadan Dubh or The Black Watch, most likely due to the distinctive dark
tartan which its soldiers wore, with the Regiment being first mustered at Aberfeldy in
1740.
The Council acknowledges the fearless and renowned reputation which The Black
Watch has established and reinforced throughout its lifetime and recognises the
significant part the Black Watch Regiment has played throughout many of the United
Kingdom’s most important military campaigns including the Seven Years’ War, the
American War of Independence, the Napoleonic Wars, the Crimean War, the Boer
War, the First and Second World Wars, the Korean War, the Troubles in Northern
Ireland and the Gulf Wars.
It further acknowledges the countless stories of individual gallantry by its members,
in particular, the 14 soldiers who were awarded the UK’s highest military decoration,
the Victoria Cross, and commemorates with gratitude all those who have served and
died in this historic regiment. The Black Watch was granted the Freedom of the City
of Perth in 1947 and the Freedom of the Burgh of Aberfeldy in 1970. Its members
come predominantly from across Perth and Kinross, Angus, Dundee and Fife but
also elsewhere in Scotland and further afield and, in recognition of their service, this
Council offers its full support to all veterans, and their families.
4(i)
Page 59 of 200

Page 60

Page 60 of 200

Page 61

PERTH AND KINROSS COUNCIL
OUTSTANDING BUSINESS STATEMENT (OBS)
(Report No. 25/110)
Please note that this statement sets out outstanding decisions of Council / this committee / sub-committee along with an update and estimated
completion date.  Actions which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then
agreement will be sought to its removal from the OBS.
No Date / Minute
Reference /
Report Number
Subject Title Outstanding Action Update Lead Officer
/Service
Action Due/
completed
Action
Expected
21. 4 September
2024.
Item 7.
Perth City
Integrated
Investment
Proposal.
Elected Members to
have early sight of
changes to parking
utilisation as a result
of Thimblerow
development, with
regular monitoring of
car parking usage in
Perth to take place
and any demand
issues to be reported
back to elected
members.
Briefing note provided
to members in
January 2025 on the
draft responses in the
formal parking survey.
Six monthly surveys
are ongoing.  Further
information to be
available in June.
Strategic Lead –
Property Services
ONGOING June 2025
5
Page 61 of 200

Page 62

No Date / Minute
Reference /
Report Number
Subject Title Outstanding Action Update Lead Officer
/Service
Action Due/
completed
Action
Expected
27. 5 March 2025. 
Item 4
Major Electricity
Development
Applications and
Community
Engagement.
Elected Member
briefing note to be
circulated.
A draft Renewable
and Low Energy
Planning
Supplementary
Guidance report will
be submitted to the
Economy and
Infrastructure
Committee on 28 May
for consideration, and
if agreed, for public
consultation.  Elected
member briefing note
to be circulated at the
same time.
Strategic Lead –
Economy,
Development and
Planning
DUE May 2025
Page 62 of 200

Page 63

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality
___________________________________________________________________
Committee or Board: Perth and Kinross Council
Date of Meeting: 7 May 2025
Report Title: Tay Cities Region Deal Programme Mid-Term Review
Report Number: 25/111
Report Author: Alison Seggie – Service Manager – People,
Partnerships and Funding
Organisational Lead: Serge Merone – Strategic Lead – Economy,
Development and Planning
1. Purpose
1.1 The purpose of this report is to provide Council with:
a) an overview of the annual report produced for the Tay Cities Region
Deal, covering the period from October 2023 to September 2024;
b) a brief summary of the delivery of the programme as it reaches the
halfway stage; and
c) an outline of the agreed approach by the Partnership to review and
reshape the Deal. 
1.2 Sections
1. Purpose
2. Recommendation(s)
3. Background
4. An Approach to re-shaping the Deal Programme
5. Conclusion
6. Impact Value Assessment
7. Appendices
6
Page 63 of 200

Page 64

2. Recommendations
It is recommended that the Council:
2.1 Welcome the TCRD Annual Report which provides an update five years into
the Deal delivery, recognising good progress and successful delivery of a
number of projects across the region, including those within Perth and
Kinross.
2.2 Ask the Strategic Lead for Economy, Planning and Development to review
projects not yet delivered, to ensure best use of funding in the final half of the
programme period; actively participate in the review process outlined in
Appendix 2 and report back to the Council at a future meeting.
3. Background
3.1 Context
3.1.1 The Tay Cities Region Deal was signed on 17 December 2020 by the Tay
Cities Region Partnership and both the UK and Scottish Governments. The
Deal is a combined investment of £150m each from the Scottish and UK
Governments over a 10-year period, to March 2030, with an opportunity to
deliver all benefits over a 15-year period, by March 2035. The Joint
Committee is currently chaired by Dundee City Council and the Perth and
Kinross Council members are Councillors Grant Laing, Eric Drysdale and
John Duff. Depute Provost Andrew Parrot is also a member of the Joint
Committee in his capacity as the regional transport partnership, TACTRAN,
representative.
3.1.2 The Tay Cities Region Deal continues to deliver in supporting business
growth, developing innovative technologies, enhancing productivity,
developing skills, and creating jobs. With the Deal now in Year 6, over half of
the £300m Government Investment has been claimed, and the following
benefits have been realised:
 152M Government investment released
 2,451 new and construction jobs created, or jobs protected; and,
 £180M leverage secured for the region, of which £160M has been
received.
3.1.3 This has been achieved through continued strong partnership ambition,
collaboration and drive to promote the best that the region has to offer.
3.2 Status of the Fund, Programmes and Projects
3.2.1 The Deal is comprised of:
- 1 Fund (the Angus Fund);
- 3 Programmes (Tourism & Culture; Skills & Employability; and a proposed
Manufacturing Programme); and
Page 64 of 200

Page 65

- 38 individual named projects.
Within the Programmes and Fund, there will be additional Projects emerging
as the Deal progresses. Table 1 below shows an overview of the projects
which have fully drawn down their TCD funding. Table 2 shows the projects
currently in delivery, and Table 3 shows the projects currently in development.
In addition to the main Deal, further funding of £40m was allocated by the
Scottish Government to the Cross Tay Link Road project. The £150m Destiny
Bridge and the New Kingsway were officially opened on 31 March 2025
marking a significant milestone in the transport and active travel infrastructure
for Perth and Kinross.  
Table 1: Projects which have been delivered/drawn down their TCRD
Funds
Project Lead Area Theme
International
Barley Hub
(£35M)
James Hutton
Institute
P&K Innovative,
International
Advanced
Plant Growth
Centre (£27M)
James Hutton
Institute
P&K Innovative,
International
Eden Campus
(£26.5M)
St. Andrews
University
Fife Innovative, International
Stretch Dome
Simulator
(£300K)
St. Andrews
University
Fife Innovative, International
Perth
Museum
(£10M)
Perth & Kinross
Council
P&K Culture & Tourism
Rural Angus
& Rural P&K
Highspeed
Broadband
(£2M)
Perth & Kinross
Council
A/P&K Connected Tay
Pitlochry
Festival
Theatre
(£10M)
Pitlochry Festival
Theatre
P&K Culture & Tourism
Biomedical
Cluster
(£25M)
Dundee University D Innovative,
International
Low Carbon
Travel Hub –
Broxden
(Phase 1 -
£790K)
Perth & Kinross
Council
P&K Connected Tay
Page 65 of 200

Page 66

Table 2:  Projects currently in delivery
Project Lead Area Theme
Skills Programme
Manager (£516K)
Perth &
Kinross
Council
P&K Empowered &
Inclusive
Digital Skills Ph.1
(£1.539M)
Fife Council Reg Empowered &
Inclusive
Skills – Life
Sciences (£1.975M)
Dundee &
Angus College
Reg Empowered &
Inclusive
SME Skills (£2.47M) Dundee &
Angus College
Reg Empowered &
Inclusive
Tay Cities
Engineering
Partnership (£2M)
Dundee &
Angus College
Reg Empowered &
Inclusive
Angus Fund
(£26.5M)
Angus Council A International,
Innovation
CyberQuarter
(£11.7M)
Dundee
University
D International,
Innovation
Eden Campus
(£26.5M)
St. Andrews
University
Fife International,
Innovation
Culture & Tourism
Programme phase
1(£27M total)
Dundee
Council/Angus
C
Reg Culture & Tourism
Hospitalfield
(£5.5M)
Angus Council A Culture & Tourism
Discovery Point
(£2.5M)
Dundee
Heritage Trust
D Culture & Tourism
Table 3:  Projects Currently in Development
Project Lead Area Theme
Hospitality Skills
(£2M)
Fife College Reg Empowered &
Inclusive
Targeting Hidden
Talent (£3.81M)
Dundee
Council
Reg Empowered &
Inclusive
Skills Pathways
(£2.925M)
Perth &
Kinross
Council
Reg Empowered &
Inclusive
Aviation Academy
(£8.1M)
UHI Perth P&K/D Empowered &
Inclusive
Digital Skills Ph.2
(£2.968M)
Fife Council Reg Empowered &
Inclusive
Angus Fund –
various projects
(£26.5M)
Angus Council A International,
Innovation
JustTech (£15M) Dundee
University
D International,
Innovation
Page 66 of 200

Page 67

Perth Innovation
Highway (£5M)
Perth &
Kinross
Council
P&K International,
Innovation
5G Digital Testbeds
(£2M)
Dundee City
Council
Reg International,
Innovation
Tay Adventures
£13.3M (incl.
£1.355M for Inner
Tay Visitor
Accommodation/Po
ntoons)
Various Reg Culture & Tourism
HMS Unicorn
(£5.7M)
The Unicorn
Preservation
Society
D Culture & Tourism
Low Carbon Travel
Hub Active Travel
(Ph.2 -£1.3m)
Perth &
Kinross
Council
P&K Connected Tay
Low Carbon Travel
Hub – Hydrogen
(Phase 3- £1.4m)
Perth &
Kinross
Council
P&K Connected Tay
Perth Bus & Rail
Interchange (£15M)
Perth &
Kinross
Council
P&K Connected Tay
Dundee Airport
(£9.5M)
Dundee City
Council
D Connected Tay
Studio Dundee
(£3M)
Dundee City
Council
D International,
Innovation
Advanced
Manufacturing
Programme (£8M)
Scottish
Enterprise
Reg International,
Innovation
Project Beacon
(£5.2M)
Ecoideam/Bin
n Eco Park
P&K Innovative,
International
Innerpeffrey
Library (£100K)
Innerpeffray
Library
P&K Culture &
Tourism
Crieff International
Highland Centre
(£1M)
Crieff
Highland
Games
P&K Culture &
Tourism
Aerospace Kinross
(£1.6M)
Aerospace
Kinross
P&K Culture &
Tourism
3.2.2 Within Perth and Kinross significant progress has been made in implementing
a number of key projects including the two projects at the James Hutton
Institute (£62M); a major refurbishment of Pitlochry Festival Theatre (£10M),
and three Council led projects, namely the new Perth Museum (£10M), phase
1 of the Low Carbon Travel Hub (£790K) and a joint project with Angus on
High Speed Broadband infrastructure (£1M for Perth & Kinross) which have
all delivered significant benefits to Perth and Kinross and the wider region.
Page 67 of 200

Page 68

In total including the £40M for the Cross Tay Link Road, the total investment
to date in Perth and Kinross projects from the Deal is £124.2M.
3.3 Benefits for the Tay Cities Region
3.3.1 As highlighted in this report, the Deal is more than just the investment. Core to
the objectives and ambitions of the region is the realisation of benefits to drive
economic growth. This includes the creation of over 6,000 jobs and £400m
leverage investment. Whilst the Deal funding is to 2030, the Partnership have
the opportunity to realise the benefits by 2035.
3.3.2 The success of those Projects in delivery, as shown through the various case
studies and Project updates in the Annual report, has led to the realisation of
many social and economic benefits for the region. To date, over one third of
the Deal’s job and leverage commitments have been realised within the first
third of the Deal reporting period.
3.3.3 Since the Deal was signed, £180.258m of leverage has been secured by
Projects to the end of September 2024. This equates to 45% of the overall
leverage commitment. This is an increase of £34.4m since last year.
3.3.4 To the end of September 2024, Projects within the Deal have received
£160.210m of the secured leverage, equating to 40% of the leverage
commitment at Deal Signing. This is an increase of £64m since last year.
3.3.5 The Tay Cities Partnership continues to work collaboratively to ensure that
Projects are delivering to benefit local and regional economy. In addition to
the delivery of Projects and PR & Comms activity, the Partnership has also
seen the following milestones met over the last year:
 Publication of the updated Tay Cities Benefits Realisation Plan in March
2024;
 PR and Comms Protocol annual refresh in Spring 2024; and,
 Partnership engagement for the refresh of the Regional Economic
Strategy Prospectus.
3.3.6 Since the end of the Annual Report Period (September 24), a number of
further Key Milestones have been delivered; including:
 Grand opening of the Crop Innovation Centre at the James Hutton
Institute with Ministerial attendance – Oct.24
 Life Sciences Project Launch Event at Dundee & Angus College – Nov.
24
 Regional Skills Investment Plan workshops with Partnership – Dec. 24
 Prospectus for Economic Growth approval – Dec. 24
 Completion of the Growing the Tay Cities Biomedical Cluster project –
Feb. 25
 Formal opening of the James Hutton Institute Phenotyping System –
Mar. 25
Page 68 of 200

Page 69

4. An Approach to re-shaping the Deal Programme
4.1 Although overall progress has delivered clear economic benefits for the
region, including Perth and Kinross, the Deal has seen a number of
challenges and issues arise over the first five-year funding period. The impact
of the Covid Pandemic and inflationary pressures has impacted on a number
of projects and created challenges for many projects still be delivered. The
main challenges identified include: -
 Availability & cost of materials
 General inflationary pressures on projects
 Delays in progressing Business cases
 The impact of the acceleration of some projects on the overall Deal
- Pressures on resources within the partnership and with project leads
4.2 To manage these challenges and risks, the Partnership held a number of
workshops over the last 12 months, and each local authority has been asked
to assess the deliverability of all projects, programmes and Funds they are the
lead for.
4.3 The most recent meeting of the TCRD Joint Committee on the 21 March 2025
agreed an approach to reshape the Tay Cities Programme at this halfway
stage. This involves an assessment of all projects currently in development
within each local authority area.
This means confirming with project owners whether the project can be fully
delivered as entered in the deal (Strand 1A), or with proposed revisions to the
Business Cases and remain in the programme (Strand 1B).
Where projects cannot progress, the local authority will propose an alternative
project to deliver the same commitments, in close collaboration with project
promoters and the relevant Thematic Board (Strand 2).  Where projects
cannot be taken forward at all, they will be put on a long list for future
opportunities and funding released for new projects.
A new refreshed programme will be agreed with Partners and Governments in
June 2026 for the last four years of the programme. The process and the
agreed timetable are outlined in more detail in Appendix 2 to this report.
Officers will engage with partners and project owners over the coming months
to assess the viability of projects to allow this to be fed into the overall review
of the programme. Where it is deemed that they cannot be delivered then
funding allocated will be redistributed as advised above.
5. Conclusions
5.1 The Tay Cities Region Deal continues to demonstrate a successful
partnership between the UK and Scottish Governments, the local authorities
of Angus, Dundee, Fife and Perth & Kinross, the Higher and Further
Education sector, business sector, third sector, Tactran, VisitScotland,
Scottish Enterprise and Skills Development Scotland.
Page 69 of 200

Page 70

5.2 In April 2025, the Tay Cities Region Deal entered the sixth year of its 10-year
lifespan. To date, there has been over £231m approved by Governments and
the Partnership for investment from the full £300m Deal. With 2,451 jobs and
over £180m of leverage secured to date, the Deal is undoubtedly delivering
growth and driving investment into the area.
5.3 However, the Review of the Deal provides an opportunity to ensure that the
projects supported in the years to March 2030 will continue to deliver the
outcomes envisaged when the Deal was signed in 2020.
6. Impact Value Assessment
6.1 An Impact Value Assessment has been carried out and can be accessed here
7. Appendices
7.1 Appendix 1 – Summary extract from the Tay Cities Region Deal Annual
Report
The Full Annual Report can be accessed via this link.
The Tay Cities Deal have also published some videos showcasing some of
the projects delivered in the first phase, including a number in Perth &
Kinross. https://www.youtube.com/@TayCitiesRegionDeal
7.2 Appendix 2 - Timetable for Tay Cities Region Deal Review Process
Page 70 of 200

Page 71

Appendix 1
(SUMMARY OF Tay Cities Region Deal - Annual Performance Report 2023 – 2024)
Introduction
An Introduction from the 2024 and 2025 Chairs of the Joint Committee
Cllr Ross
Fife Council (Joint
Committee Chair 2024)
Cllr Flynn
Dundee City Council (Joint Committee
Vice Chair 2024 and Chair 2025)
The Tay Cities Region Deal continues to
demonstrate successful partnerships between
the UK and Scottish Governments, the local
authorities of Angus, Dundee, Fife and Perth
& Kinross, the Higher and Further Education
sector, business sector, third sector, Tactran,
VisitScotland, Scottish Enterprise and Skills
Development Scotland.
In April 2024, the Tay Cities Region Deal
entered the fifth year of its 10-year lifespan.
To date, there has been over £231m approved
by Governments and the Partnership for
investment from the full £300m Deal. With
2,451 jobs and over £180m of leverage secured
to date, the Deal is undoubtedly delivering
growth and driving investment into the area.
Over the last 12 months, there has been a
tremendous amount of progress towards
the delivery of projects, including some key
milestones being reached. This includes the
official opening of Perth Museum in March
2024. This must-see attraction is a major
cultural venue, also becoming home to the
Stone of Destiny which is presented in a
walkthrough experience. The popularity of this
has seen the museum welcome its first 176,000
visitors as of September 2024.
May 2024 saw the Growing the Tay Cities
Biomedical Cluster Project complete the
refurbishment of Wilson House, which will
allow high-growth companies to deliver the
therapeutics, diagnostics and healthcare
innovations of tomorrow, whilst also increasing
industry partnership. The other elements of this
Project will officially open in Spring 2025.
The Advanced Plant Growth Centre, which
has become the heart of the James Hutton
Institute, opened in August 2024. The centre is
home to world-leading plant science, delivering
innovative solutions for food and environmental
sustainability. The Wolfson Foundation has
provided an award of £1m towards equipment
that has also been supported by Scottish
Enterprise and will be housed within a new
Molecular Phenotyping Centre, which is set to
open in March 2025.
The Tay Cities Region Partnership, including
Governments and Joint Committee, continues
to monitor the economic challenges faced by
all, while recognising the positive outcomes of
the Deal to date.
At this point, much has already been achieved
in delivering the Deal’s ambitions for a fairer,
smarter Tay Cities region. Whilst the Partnership
recognises the economic challenges the city
region continues to face, we are very pleased
with the positive outcomes achieved by the Tay
Cities Region Deal so far.
4
6
Page 71 of 200

Page 72

Growing Tay Cities
Biomedical Cluster Project
completed refurbishment of
Wilson House.
Perth Museum celebrated
its official opening, marking
a pivotal moment in the
region's culture and tourism
industry.
5G Digital Testbeds and
cyberQuarter Project worked
together and demonstrated
how 5G drone technology could
transform search and rescue
missions in remote areas, such
as the Angus Glens.
The James Hutton Institute
celebrated its official opening
of the Advanced Plant Growth
Centre and the International
Barley Hub, bringing a world
leading research facility in
agriculture to the region.
Pitlochry Festival
Theatre completed the
construction elements of
the Project.
2,451 jobs created by
Projects since Deal Signing.
This equates to more than
one third of the overall job
commitment of the Deal.
5
Contents
Up to the end of September 2024,
£231.69m of funding has been
approved for investment by the Tay
Cities Region Joint Committee. This
equates to more than two thirds of
the Deal. Of this, £170.98m relates
to individual Projects.
£152.108m of Government
£ investment released.
£
The Tay Cities Region
Deal enters Year 5 and
has claimed over half of
£300m funding allocated.
£180.258m leverage has been
secured by Projects within
the Deal. This equates to
more than 45% of the overall
leverage commitment of the
Deal.
Tay Cities Region Deal - Annual Performance Report 2023 - 2024
Executive Summary
Page 72 of 200

Page 73

Tay Cities Region Deal - Annual Performance Report 2023 - 2024
6
2,451 jobs have been created
by Projects since Deal Signing.
This equates to more than
one third of the overall job
commitment of the Deal.
Discovery Point Transformed
Page 73 of 200

Page 74

Tay Cities Region Deal - Annual Performance Report 2023 - 2024
7
The Tay Cities Region Deal
Cities Region Deal Overview
The Tay Cities Region Deal was signed on 17th December 2020 by the Tay Cities Region Partnership
and both the UK and Scottish Governments. The Deal is a combined investment of £150m each
from the Scottish and UK Governments over a 10-year period, to March 2030, with an opportunity to
deliver all benefits over a 15-year period, by March 2035.
The Tay Cities Region Deal1 continues to deliver in supporting business growth, developing
innovative technologies, enhancing productivity, developing skills, and creating jobs.
With the Deal now in Year 5, over half of the £300m Government Investment has been claimed, and
the following benefits have been realised:
£152.108m Government investment released;
2,451 new and construction jobs created, or jobs protected; and,
£180.258m leverage secured for the region, of which £160.210m has been received.
This has been achieved through continued strong partnership ambition, collaboration and drive.
Governance
The Tay Cities Region Deal partners work collaboratively with both the UK and Scottish
Governments as well as regional partners, including representation from private and third sector
organisations:
Local Authorities – Angus Council, Dundee City Council, Fife Council and Perth & Kinross Council
Higher Education and Further Education sector
Business representatives
Regional third sector interface bodies
Scottish Enterprise
Skills Development Scotland
Tactran
VisitScotland
The Deal’s governance arrangements continue to enable decisions to be made in an open and
transparent way for the Tay Cities region and consideration of wider issues including the oversight
of the Regional Economic Strategy. The Partnership have been commended by both Governments
at recent annual conversations for their well-established and collaborative governance.
1 www.taycities.co.uk/sites/default/files/tay_cities_deal_doc_feb_8.pdf
Page 74 of 200

Page 75

Tay Cities Region Deal - Annual Performance Report 2023 - 2024
8
The Joint Committee is supported by a number of bodies which are summarised in the governance
chart diagram on the Tay Cities Region Deal website2. More information on the governance structure
and the Deal can be found in the Deal Document.
Geographical Overview
The map below shows the geographical area of the four Local Authorities within the Deal: Angus,
Dundee City, Fife and Perth & Kinross. Only North-East Fife is included within the Deal, with the
remainder of Fife within the Edinburgh and South-East City Region Deal.
Diagram 1
National PMO Networking Group
The Tay Cities Region Project Management Office (PMO) continues to lead and provide the
secretariat for a National PMO Networking Group, which includes representation from Regional and
Growth Deals from across the UK. The group aims to share best practice and exchange guidance,
use the platform for presentations from various organisations, and utilise the knowledge of its
members to start sub-groups specific to enhancing City Region and Growth Deals.
2  www.taycities.co.uk/sites/default/files/2024-10/TCRD%20Governance%20Structure_2.pdf
Forf
ar
Pert
h
Dund
ee
St
Andrew
s
Local Authority Areas
Angus
City of Dundee
Fife
Perth & Kinross
Edinburgh &
South East
City Deal
Glasg
ow Edin
urgh
Page 75 of 200

Page 76

Tay Cities Region Deal - Annual Performance Report 2023 - 2024
9
Demonstrating the benefits of this national working group, the Programme Manager for the
Inverness and Highland City Region Deal noted that:
“Whilst most of the Deals across the UK are varied in how they are structured and in terms
of their maturity, a drive and desire to successfully deliver is common to all the people in the
various Deal PMOs. The PMO Networking Group brings together those people and provides
a great forum for sharing knowledge and making really useful contacts – certainly from
the Inverness & Highland City Region Deal, myself and colleagues value the network and
continue to build good relationships across the Deals which has provided valuable insights
and ideas to further our aims”.
There have been a number of short and longer-life sub-groups established to date including the:
Decarbonisation sub-group
Benefits Realisation sub-group
Subsidy Control sub-group
Finance sub-group.
The wider network and various sub-groups are a valuable source of information and present an
opportunity to share knowledge and expertise. The Tay Cities PMO is presented as an exemplar by
Governments for the sharing of best practice to other City Region and Growth Deals.
The PMO Network has regular engagement with both Governments, other organisations and
regional opportunities including:
Scottish Government and UK Government attendance - including a discussion about Economic
Dimension Development for City Region and City Growth Deals in November 2023 and
engagement with all Deals regarding Programme reviews in September 2024.
Green Book Training with the HM Treasury in August 2024. To date the PMO have worked with
UKG to deliver HM Treasury Green Book training to 743 people involved in the Tay Cities Deal.
PMO attendance at the Scottish Parliament in January 2024, discussing the benefits of the City
Region and Growth Deals Carbon Guidance and methodology for the Deals, and wider economic
drivers.
Digital Office Scotland and CENSIS Attendance in February 2024 on the adoption of the Internet
of Things.
Page 76 of 200

Page 77

Tay Cities Region Deal - Annual Performance Report 2023 - 2024
10
The Deal is comprised of 1 Fund,
3 Programmes and 38 Projects.
Within the Programmes and
Fund, there will be additional
Projects emerging as the Deal
progresses.
Life Sciences Biotechnology and Medical Technology: Growing the Tayside Biotech, Biomedical and Agritech Project
Page 77 of 200

Page 78

Tay Cities Region Deal - Annual Performance Report 2023 - 2024
11
Development Programme
The Deal
This section of the Annual Performance Report summarises the Projects that have entered into the
implementation or delivery stage following full Government and Joint Committee approval, up to
and including September 2024. The Projects are categorised by Tay Cities Region Deal themes and
are aligned to the Implementation Plan, with any updates to milestones and risks highlighted.
Status of Fund, Programmes and Projects
The Deal is currently comprised of 1 Fund, 3 Programmes and 38 Projects. Within the Programmes
and Fund, there will be additional Projects emerging as the Deal progresses. Table 1 below shows
an overview of the status of the Programmes, Fund and Projects up to the end of September 2024.
Table 1: Status of Funds, Programmes and Projects up to end of September 2024
Programme/Project Location Stage
An Empowered & Inclusive Tay
Regional Skills & Employability Development Programme3 Regional Implement (Phase 1)/
Define (Phase 2)
Skills Programme Manager Regional Implement
Digital Skills (Phase 1) Regional Implement
Life Sciences Biotechnology and Medical Technology:
Growing the Tayside Biotech, Biomedical and Agritech
Regional Implement
Supporting SME Skills Regional Implement
Digital Skills (Phase 2) Regional Define
Regional Skills & Employability
Hospitality Skills Regional Define
Tay Cities Engineering Partnership Regional Implement
Aviation Academy for Scotland Regional Define
An Innovative, International Tay
Growing the Tay Cities Biomedical Cluster Dundee Implement
International Barley Hub Perth & Kinross Deliver
Advanced Plant Growth Centre Perth & Kinross Deliver
3 There are a number of Phase 2 Regional Skills and Employability Development Programme Projects to be defined and delivered. These will be included in future Annual Performance
Report updates, as and when they are agreed by Governments and the Partnership.
Page 78 of 200

Page 79

Tay Cities Region Deal - Annual Performance Report 2023 - 2024
12
& Toursim
Programme/Project Location Stage
Angus Fund Angus Implement
CASI Programme Angus Define
Mercury Drone Port Angus Implement
Angus Rural Mobility Hub Angus Define
Zero Four Angus Define
Low Carbon Housing Angus Define
Angus Fund
Connecting Montrose Angus Define
cyberQuarter Dundee Implement
Just Tech Dundee Define
Perth Innovation Highway Perth & Kinross Define
Studio Dundee Dundee Define
Advanced Manufacturing Programme Regional Define
Eden Campus Fife Implement
Stretch Dome Simulator Fife Deliver
Project Beacon Perth & Kinross Define
Regional Culture & Tourism Investment Programme4 Regional Implement (Phase 1)/
Define (Phase 2)
Hospitalfield Angus Implement
Regional Culture
Investment
Discovery Point Transformed Dundee Implement
Pitlochry Festival Theatre Perth & Kinross Implement
Perth Museum Perth & Kinross Deliver
Innerpeffray Library Perth & Kinross Define
Crieff International Highland Centre Perth & Kinross Define
Aero Space Kinross5 Perth & Kinross Implement
A Connected Tay
Rural Angus and Rural Perth & Kinross Highspeed Broadband Angus and
Perth & Kinross
Deliver
5G Digital Testbeds Regional Implement
Broxden Low Carbon Travel Hubs Perth & Kinross Implement
Perth Active Travel Hub Perth & Kinross Define
Hydrogen Refuelling Station Perth & Kinross Define
4 There are a number of Phase 2 Regional Skills and Employability Development Programme Projects to be defined and delivered. These will be included in future Annual Performance
Report updates, as and when they are agreed by Governments and the Partnership.
5 Aerospace Kinross currently has Joint Committee approval subject to conditions and is still in the feasibility stage. When the Project is in a position to proceed to delivery it will be
added to a future Annual Performance Report.
Page 79 of 200

Page 80

Tay Cities Region Deal - Annual Performance Report 2023 - 2024
13
Programme/Project Location Stage
Dundee Airport Investment revenue Implement
Dundee Airport Investment capital Dundee Define
Perth Bus & Rail Interchange Perth & Kinross Define
Stage No. Definition
1. Define Business case being developed, and not yet approved by Joint
Committee.
2. Implement Business case has been approved by Joint Committee, and is
being implemented. In a capital Project, this may be construction;
for skills Projects this may be establishing/delivering a course.
3. Deliver Project is in place and monitoring and evaluation is in framework
to assess if it is achieving its objectives.
4. Legacy Project has resulted in mainstreaming or improvements to
business as usual (impact) that is generated beyond the funded
period.
Project Owner Events
The Tay Cities PMO continues to support the Partnership, as well as the Fund, Programme and
Projects by holding regular Project Owner events. These events allow:
Projects to share their experience with other Project Owners,
Networking between Project Owners,
The PMO to provide updates on the Deal and any upcoming events,
Q&A sessions with PMO and Project Owners.
Project Progress
The following information provides a snapshot of progress throughout the year and are shown by
Tay Cities Region Deal theme, for the Programmes, Fund and Projects in delivery.
This includes a description of the Programme, Fund and Projects, headline achievements, and
where appropriate, upcoming milestones and a case study. The summaries also set out the funding
awarded to each.
The Projects which have received Full Business Case approval from Joint Committee since October
2023 are listed below and have been added to this years Annual Performance Report update:
Life Sciences Biotechnology and Medical Technology: Growing the Tayside Biotech, Biomedical
and Agritech
Supporting SME Skills
Page 80 of 200

Page 81

Appendix 2
Timetable for Tay Cities Region Deal Review Process
The lead local authority Directors to obtain and submit assurance
that the Programmes, Fund and Projects can be fully delivered as
entered into Deal, following liaison with the relevant Thematic
Boards.
23rd June 2025
Assessment and Recommendations from Strand 1A presented in a
report to Management Group and Finance Directors Group.
28th August 2025
Strand 1A
Assurance of
Existing
Commitments
Joint Committee informed of progress of Strand 1A work. 3rd October 2025
The lead local authority Directors will identify and submit
substantive changes, via change request process, for existing
projects following liaison with the relevant Thematic Boards.
15th October 2025
Review and assessment by Partnership Review Panel. w/c 17th November
2025
Assessment and Recommendations from Strand 1B presented in a
report to Management Group and Finance Directors Group.
27th November
2025
Strand 1B
Identify
Substantive
Changes to
Existing Projects
Joint Committee informed of progress of Strand 1B work. 12th December
2025
Partners identity and submit any alternative Project(s) within the
region in the form of a SOC. It is important that any proposals are
presented having secured local authority Director, Finance Director
and Thematic Board approval.
27th February 2026
Review and assessment by Partnership Review Panel. 13th April 2026
Report provided to Finance Directors Group ahead of Management
Group.
14th May 2026
Assessment and Recommendations from Strand 2 presented to
Management Group.
28th May 2026
Partnership engagement with Governments with outcome of
Strands.
June 2026
Strand 2
Alternative
Projects within
the Region
Update to Joint Committee on outcome of reshaping work. June 2026 (date
TBC)
Formal
Engagement
with
Governments to
Confirm New
Programme
The revised Programme, and any alternative proposals identified in
Strand 2, will need to seek and secure Ministerial approval. It has
been indicated that this would typically take 8-12 weeks.
The Partnership will need to provide a formal submission with
supporting evidence for this request. The detailed breakdown will
be set out in a later version of the timetable. 
June - September
2026 (Ministers -
subject to
availability)
*pre-election end of
March - May and
Summer recess
June - end of
August will impact
on Government
Civil Servant and
Ministerial
availability
6
Page 81 of 200

Page 82

Page 82 of 200

Page 83

Our vision is a Perth and Kinross where everyone can live life
well, free from poverty and inequality
___________________________________________________________________
Committee or Board: Perth and Kinross Council
Date of Meeting: 7 May 2025
Report Title: Annual Treasury Report 2024/25
Report Number: 25/112
Report Author: John Jennings, Senior Accountant
Organisational Lead: Scott Walker, Chief Finance Officer
___________________________________________________________________
1. Purpose
1.1 A requirement of the Council’s approved Treasury Management Practice 6
(TMP6 – Reporting Requirements & Management Information Arrangements)
is the reporting to Council of the expected treasury activity for the forthcoming
year (i.e. the Treasury and Investment Strategy) and the subsequent reporting
of the actual results and activities (i.e. the Annual Treasury Report).
1.2 The Council meeting on 6 March 2024 approved the Treasury Strategy for the
6 financial years 2024/25 to 2029/30 and the annual Investment Strategy for
2024/25 (Report No. 24/69 refers).  The consideration of this Annual Treasury
Report for 2024/25 ensures compliance with the latter requirement.
1.3 This Annual Treasury Report covers:
 The Council’s treasury position
 The forecast economic outlook and borrowing strategy for 2024/25
 The actual economic situation for 2024/25
 Actual long-term borrowing and repayments in 2024/25
 The Investment Strategy and outturn for 2024/25
 Compliance with treasury policies and limits during 2024/25
 The Statutory Loans Fund position
2. Recommendations
2.1 It is recommended that the Council notes the contents of this report.
7
Page 83 of 200

Page 84

3. Background
Historic Information/Context
3.1 In order to place this report in context, the Council’s Treasury position at the
beginning and at the end of the year is shown below:
Principal
31 Mar 2024
£M
Average
Rate
%
Principal
31 Mar 2025
£M
Average
Rate
%
Fixed Rate/Long Term Funding
 Public Works Loan Board
(PWLB)
585.0 2.50 652.0 2.76
 Market & Local Authority Bonds 43.2 4.59 63.2 4.51
 Other Loans & Bonds 0.0 0.00 0.0 0.00
628.2 2.64 715.2 2.92
Variable Rate/Short Term Funding
 Temporary Loans 2.2 4.58 2.8 3.82
 Internal Loans 2.4 4.81 2.7 4.02
4.6 4.69 5.5 3.92
TOTAL DEBT 632.8 2.66 720.7 2.93
TOTAL INVESTMENTS 65.5 6.48 24.1 5.50
4. The Forecast Economic Outlook and Borrowing Strategy 2024/25
4.1 Following a period of significant rises in inflation to over 10%, the Bank of
England’s Monetary Policy Committee (MPC) increased the Bank Base Rate
to 5.25% in August 2023. By the start of 2024/25, inflation had fallen
significantly to 3.2% and was expected to continue to fall over the year.
Therefore, the forecast was that the Bank Base Rate had peaked and would
start to fall later in the year. Gilt yields, which determine the UK Government’s
borrowing costs and are used to set PWLB rates, were also expected to fall
gradually over the year, subject to economic data and volatility. Further,
shorter-term borrowing rates were expected to remain cheaper than longer-
term rates.
4.2 The estimated capital borrowing requirement for 2024/25 at the start of the
year was £219.8 million, with further significant borrowing totalling £507.0
million required in the subsequent 5 years. These amounts reflected the
need to borrow for the Council’s Capital Budget approved in February 2024 to
fund the capital expenditure, however they do not take account of the
Council’s overall cash position and therefore borrowing which may be
deferred. With the advanced borrowing in previous years having now been
applied to the Capital Programme, the Council resumed its new borrowing at
the end of 2023/24, and it was anticipated that this would continue throughout
2024/25. However, it was further anticipated that some of the 2024/25
borrowing requirement may be deferred as a result of the Council’s overall
positive cash position.
Page 84 of 200

Page 85

4.3 Therefore, the Council’s Treasury Strategy for 2024/25 assumed that there
was a need to borrow throughout the year. With short term rates expected to
remain cheaper than medium and long-term rates, short term borrowing
would be undertaken where required, with long-term borrowing being deferred
until rates were more favourable. Whilst the use of short-term borrowing
would be initially cheaper, the use of longer-term borrowing gives cost
certainty and would reduce the refinancing risk in later years. However, if
longer term rates stayed high, new long-term borrowing would be delayed and
short-term borrowing used to meet immediate cashflow requirements.
4.4 The approved Treasury Strategy also allowed for consideration of other
market borrowing instruments where they offered favourable rates, or the
ability to arrange borrowing to be drawn down at a given future date.
However, the associated risks due to their variable rate nature and/or less
flexible terms in comparison to the Public Works Loan Board would also need
to be considered.
4.5 Consideration has previously been given to borrowing for future year
requirements earlier than immediately required, if rates reached a forecast
low point. This approach is consistent with the Prudential Code but should be
considered in conjunction with the assessment of the additional risks and
potentially lower returns from the resultant short-term increase in the level of
investments. However, given the interest rate projections, advance borrowing
was unlikely to be undertaken in 2024/25.
4.6 Whilst minimising risk by favouring fixed longer-term borrowing, it was
acknowledged that there were several factors which could impact on interest
rates over the year. Therefore, the Council applies an approach of managing
risk and monitoring interest rates on an ongoing basis with a view to reviewing
this strategy should circumstances change.
5. Actual Economic Situation 2024/25
5.1 The Bank Base Rate was 5.25% at the start of year. With inflation falling
significantly since its peak of over 10% in 2023 to around 2% by August 2024,
the MPC reduced the Bank Base Rate to 5%. Subsequently, there were two
further reductions in the Bank Base Rate during the year, which currently
stands at 4.5% since February 2025. Whilst inflation has since increased
slightly to around 3%, it is still anticipated that there will be further reductions
in the Bank Base Rate during 2025. Economic growth in the UK over the year
has remained at a very low level, ranging from 0% to 0.5%.
5.2 The year was also affected by global political and economic events, with
significant uncertainty and volatility within the financial markets.
Page 85 of 200

Page 86

5.3 As Base Rate expectations remained on a reducing path, PWLB rates initially
followed a falling trend but remained at higher levels. Whilst they fell gradually
at the start of the year in line with Base rate expectations, they subsequently
increased in the second half of the year in response to UK and global political
and economic uncertainties.
Whilst PWLB rates have since fallen from their high point in January 2025,
they ended the year higher than the at the start. The PWLB rates for various
periods over 2024/25 are shown at Appendix I.
5.4 The graph in Appendix I highlights the volatility and uncertainty that existed
around interest rates as the year progressed. The 50-year rate was 5.01% at
the start of the year and reduced to 4.89% by September 2024, before rising
and peaking at 5.88% in January 2025. It subsequently reduced to 5.67% by
31 March 2025. All other durations followed a similar pattern, but with rates for
5 years or less being the lowest available for much of the year, and also being
subject to high levels of volatility. By 31 March 2025 the 5-year rate was
4.97%.
5.5 Investment deposit rates also reduced over the first half of the year, in line
with future interest rate expectations. This reflected the Bank base rate during
the year, as well as expectations of reductions in the Bank Rate later in the
future. The average rate on the Council’s investments at the start of the year
was 6.48% and reduced to 5.50% by the end of the year. However, it should
be noted that these rates are affected by the higher rates in the local authority
borrowing and lending market, in comparison to rates available from banks.
6. Actual Long-Term Borrowing & Repayments
6.1 Treasury activity during 2024/25 is detailed in the Treasury Activity and
Compliance reports previously submitted to the Finance & Resources
Committee (Report No’s 24/320 and 25/101) and the Elected Member Briefing
notes in July 2024 and January 2025.
6.2 As noted in paragraph 4.2 above, based on the approved Capital Programme
before the start of the year, the Council’s estimated new capital borrowing for
2024/25 was £219.8 million. It was expected that some of this borrowing may
be deferred due to the Council’s overall positive cash position, with the actual
borrowing required to be undertaken throughout the year, unless interest rates
remained high and it was also deferred by using short term borrowing.
6.3 With interest rates being relatively high at the start of the year, and taking
longer to reduce than had been forecast, no new longer-term borrowing was
undertaken until August 2024. Subsequently, with a growing borrowing
requirement as the year progressed, further borrowing was undertaken in
December 2024, February 2025 and March 2025. Interest rates over this
period had risen, but opportunities were taken to borrow at the most
preferential times during this period. A total of £100 million was borrowed
during this period, summarised in the following table:
Page 86 of 200

Page 87

Date Lender Type Term Amount Rate
28 Aug 2024 Local Auth Maturity 3 yrs £20,000,000 4.35%
20 Dec 2024 PWLB Maturity 3 yrs £10,000,000 4.91%
20 Dec 2024 PWLB Maturity 4 yrs £10,000,000 4.88%
21 Feb 2025 PWLB EIP* 3 yrs £30,000,000 4.47%**
11 Mar 2025 PWLB Maturity 1 yr £5,000,000 4.82%
21 Mar 2025 PWLB EIP 2 yr £25,000,000 4.82%
TOTAL 2.7 yrs £100,000,000 4.636%
Note  * EIP denotes Equal Instalments of Principal, with the loan repaid equally over the term.
** borrowed at PWLB’s HRA Interest rate, with a discount of 40 bps from the Certainty Rate.
6.4 The amount borrowed is significantly lower than the estimated Borrowing
Requirement. This is due to movements in the Capital Budget over the year,
positive cashflows, as well as significant cash balances held relating to the
Council’s short-term reserves. Consequently, an estimated £84 million of the
borrowing Requirement for the year has been carried forward to be borrowed
in subsequent years.
6.5 The new borrowing is also for relatively shorter terms than historic borrowing,
at an average of 2.7 years. This is due to the strategy of borrowing for shorter
periods whilst interest rates are high, with a view to refinancing these loans at
their maturity at lower rates (based on current interest rate forecasts). This
strategy also includes the use of EIP loans, where some of the principal sum
borrowed is repaid equally each year over the term of the loan, and thus can
also be refinanced over the period at lower rates. The Council also fully
utilised the PWLB’s discounted HRA borrowing rate available during the year,
in line with the Council’s capital programme.
6.6 The Council’s scheduled repayments to the PWLB during the year amounted
£13 million covering 3 individual loans. These had been borrowed for an
average of 12 years at an average rate of 2.83%. Therefore, over the year,
the average PWLB debt portfolio rate for the Council increased from 2.5% at
the start of the year, to 2.76% for the total of £652 million of PWLB debt held
by the Council on 31 March 2025.
6.7 There was one loan borrowed during the year from a local authority for £20
million, for 3 years at 4.35%. Therefore, the total market loans outstanding,
including LOBOS, increased to £63.2 million at an average rate of 4.51% at
31 March 2025.
6.8 As anticipated in the original Treasury Strategy, there were no premature
repayments or restructuring of PWLB or long-term market debt. This reflects
the structure and profile of the Council’s current debt portfolio, making any
further restructuring not cost effective.
Page 87 of 200

Page 88

6.9 In addition, a total of £47 million short term (temporary) borrowing was
undertaken to cover more immediate day-to-day cash requirements. The
borrowing was undertaken for an average of 40 days and at average of
5.04%. All such loans were repaid during the year with none outstanding at 31
March 2025. Other short term variable funding held relates to internal loans
from local associated bodies and Common Good Funds, with the balances
determined by their own cashflow requirements. At the year-end, these funds
increased slightly from £4.6 million at 31 March 2024 to £5.5 million at 31
March 2025.  The overall average rate for the Council’s external debt
increased from 2.66% at 31 March 2024 to 2.93% at 31 March 2025.
6.10 The Council’s average Consolidated Loans Fund (CLF) interest rate, which
includes other charges and is based outstanding Loans Fund advances,
increased from 2.76% in 2023/24 to an estimated 3.22% in 2024/25 (based on
applying statutory guidance). This increase reflects the amount of new
borrowing and rising interest rates of the borrowing relative to previous years.
7. Investment Strategy and Outturn 2024/25
7.1 Investment rates reduced gradually from the start the year following the
expectations of the Bank Base Rate. These rates continued to fall as the Bank
Base rate was cut over the second half of the year, with expectations of
further cuts in the coming year.
7.2 The original Strategy anticipated that the level of investments would continue
to reduce gradually over the year unless, for example, new borrowing was
undertaken early in the year or the Council’s expenditure during the year was
later than anticipated. As outlined above in paragraph 6.3, no new borrowing
was undertaken until August 2024, and so consequentially, the level of
investments gradually reduced over the course of the year. The level of
investments stood at £65.5 million at the start of the year, peaked at £84.975
million on 17 April 2024, before steadily reducing to their lowest level of £6.5
million on 11 February 2025. Following further new long-term borrowing, the
level of investments initially rose, and stood at £24.1 million on 31 March
2025.
7.3 In the first half of the year, longer fixed deposit rates (up to 1 year) offered
higher returns than shorter investment periods or notice and money market
funds. Consequently, the opportunity was taken to invest in these periods
where possible within cashflow requirements. As the year progressed, and the
level of investments reduced, there were fewer opportunities within the
Council’s cashflow and consequently any fixed deposits were for shorter
durations. This coincided with the investment rates available also starting to
reduce. However, by March 2025, as a result of positive cashflow balances
(including new long-term borrowing), some loans to other local authorities
were made, for periods of around one month. Due to very low liquidity in the
local authority market, interest rates available increased significantly to over
6%.
Page 88 of 200

Page 89

7.4 The various money market funds used by the Council were used to meet short
term cashflow requirements and keep within counterparty limits. Notice
accounts were not used during the year due to the less competitive rates
offered on such investment products.
7.5 During the year, no investment was made for more than 12 months, and all
investment activities were in line with the approved strategy for 2024/25. The
average lending term for fixed deposits was significantly shorter than previous
years at 53 days, and at an average rate of 5.27%. In comparison, the
average temporary borrowing rate for the year was 4.62%.
7.6 The average rate on investments outstanding at 31 March 2025 was 5.50%
(6.48% at 31 March 2024). This reduction in the average rate over the year
reflected the shorter duration deposits undertaken and the need to maintain
sufficient balances in instant access Money Market Funds to meet day-to-day
requirements. However, it includes loans outstanding with other local
authorities at higher than bank deposit rates.
7.7 Total interest receivable at maturity on investment activity in 2024/25
amounted to £2.062 million. This is lower than the previous year (£4.076
million in 2023/24), due to lower investment balances, a significant reduction
in the level of investment activity and lower interest rates. On an accruals
basis, the estimate of investment income to be credited in 2024/25 is £2.531
million (£6.422 million in 2023/24).
7.8 All financial investments by the Council’s Common Good Funds and
Charitable Trusts were made through the Council’s Loans Fund, in
accordance with the Council’s and Common Good Fund’s policy for Permitted
Investments. As a result, £2.710 million of Common Good funds and
Charitable Trusts were on deposit with the Loans Fund at 31 March 2025 for
periods of between 1 and 12 months at an average rate of 4.02%.
7.9 Any investments held with external fund managers are outside the scope of
the investment regulations, as they all relate to funds held by Council
administered Charities or Trusts.
7.10 The Annual Property Investment Strategy for 2024/25 was also approved by
the Council at its meeting on the 6 March 2024 and was complied with in full,
with no breaches in compliance with permitted investment limits. The
projected income from the Council’s property portfolio for 2024/25 was
originally set at £1.817 million, whilst the latest estimate is £1.924 million.
There were no additional risks identified or new property investments entered
into over the year. The strategy action plan remained on programme.
8. Compliance With Treasury Policies and Limits
8.1 There were no breaches of compliance with the Council’s approved borrowing
and investment policies and strategy in 2024/25. All aspects of the Prudential
Code, including Prudential Indicators and limits, were also fully adhered to
throughout the year.
Page 89 of 200

Page 90

9. Statutory Loans Fund
9.1 The Loans Fund is an internal fund operated by the Council to manage:
 The write down (repayments or “amortisation”) of capital expenditure
(capital advances) over the life of the various assets being funded by
borrowing as part of the Council’s Loan Charges, and
 To manage the external borrowing raised to finance the capital
expenditure.
9.2 Whilst both these elements of the Loans Fund operate independently of each
other, because they are based on the same capital plans of the Council, they
are consistent with each other over the long term. However, significant
differences may arise in the short-term due to, for example, delaying external
borrowing, or borrowing in advance in light of prevailing interest rates, or
where the Council has significant levels of cash Reserves.
9.3 The approved Loans Fund policies allow the amortisation of capital
expenditure (advances) for periods of up to 50 years in line with the asset
useful lives, using the annuity method. The repayment of Loans Fund
advances are also deferred until the asset being funded is completed and
operational. As a result, some of the repayments may fall due after 50 years
from the time of the original advance.
9.4 It is a requirement of the Loans Fund regulations that the outstanding amount
of Loans Fund advances at the end of each financial year is reported as part
of the annual report. The value of Loans Fund advances outstanding at 31
March 2025 is estimated as £799.118 million (subject to completion and audit
of the Council’s Annual Accounts). This is made up as follows:
 Capital Advances outstanding 1 April 2024 - £667.120 million
 Add New capital Advances 2024/25 - £139.561 million
 Less Capital Advances repaid in the year - £7.563 million
9.5 The future repayment of these advances is summarised in the table below:
Page 90 of 200

Page 91

Core
Composite
Programme
Prudential
Borrowing
Sub-Total
General
Fund
Housing
Revenue
account TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000)
Within 1 year 2,714 3,068 5,782 3,529 9,311
Between 1 and 2 years 2,991 3,278 6,269 3,689 9,958
Between 2 and 5 years 10,080 8,369 18,449 11,955 30,404
Between 5 and 10 years 21,207 6,813 28,020 23,472 51,492
Between 10 and 15
years 28,387 4,864 33,251 21,772 55,023
Between 15 and 20
years 39,642 4,065 43,707 13,574 57,281
Between 20 and 25
years 55,272 4,363 59,635 13,443 73,078
Between 25 and 30
years 64,321 5,133 69,454 14,990 84,444
Between 30 and 35
years 79,350 4,706 84,056 14,685 98,741
Between 35 and 40
years 102,871 3,820 106,691 17,935 124,626
Between 40 and 45
years 93,159 2,319 95,478 19,542 115,020
Between 45 and 50
years 75,038 291 75,329 10,496 85,825
Over 50 years 3,915 0 3,915 0 3,915
GRAND TOTAL 578,947 51,089 630,036 169,082 799,118
9.6 Comparison of the outstanding capital advances above with the long-term
external debt shown in paragraph 3.1 demonstrates that actual capital
expenditure funded by borrowing is higher than the actual borrowing
undertaken to date by around £84 milllion. This reflects the strategy adopted
in recent years of deferring new borrowing whilst rates were at high levels,
and utilising Reserves cash balances to meet immediate cashflow
requirements. New borrowing would only be undertaken when there were
insufficient available cash balances. The Council started the year in an “under
-borrowed” position of around £34 million, whilst the position at the end of the
year shows that this has more than doubled to £84 million, highlighting the
strategy of deferring borrowing where possible. It should also be noted that
the Council has approved a significant borrowing requirement over the next 6
years on its Capital programmes.
9.7 The Council approved its new Composite Capital Budget to 2030/31 on 26
February 2025 (Report No. 25/37 refers), whilst the Housing and Social
Wellbeing Committee approved the HRA Capital Investment Programme to
2029/30 on 22 January 2025 (Report No. 25/09 refers). The last report to the
Finance & Resources Committee on 30 April 2025 (Report No. 25/100 refers)
approved adjustments to these Programmes. Consequently, the amount of
approved capital expenditure to be funded by borrowing (ie new Loans Fund
advances) in each of the next 6 years is as follows:
Page 91 of 200

Page 92

Composite
Programme
Housing
Investment
Programme TOTAL
(£'000) (£'000) (£'000)
2025/26 134,116 26,615 160,731
2026/27 102,443 12,865 115,308
2027/28 66,105 12,652 78,757
2028/29 48,178 10,063 58,241
2029/30 30,302 17,659 47,961
2030/31 27,966 - 27,966
TOTAL 409,110 79,854 488,964
9.8 All the above Loans Fund repayments and new borrowing have been included
in the Loan Charge estimates within the approved Medium Term Financial
Plan, and therefore remain affordable under the current Loan Charge Budget
strategy. This also includes estimates of new borrowing in the years beyond
2030/31.
9.9 This borrowing will be funded through a combination of existing budgets, and
the decisions taken by Council on 26 February 2025, i.e. to increase the loan
charges budget by applying 1.25% of future Council Tax increases from
2025/26.
10. Conclusion
10.1 Global economic volatility meant that interest rates were higher than forecast
during the year and remained at high levels. This was a result of global
economic and political uncertainties, despite the reduction in the Bank Base
rates during the period. However, the Bank base rate was also reduced at a
slower rate than had been anticipated.
10.2 In light of the above economic conditions and interest rates, new long-term
borrowing of £100 million was undertaken between August 2024 and March
2025, and with the Council also applying its cash reserves to meet day-to-day
requirements. Consequently, the Treasury activity initially focussed on
investment activity and the management of existing investment balances. As
investment balances reduced over the first half of the year, investment interest
rates also fell. In the second half of the year, the Investment activity moved to
fixed deposits for shorter periods and extensive use of money market funds to
manage immediate cashflow requirements.
10.3 There were no breaches of compliance with the lending policy and all
Prudential Indicators were complied with throughout the year. As a result of
the activities undertaken during 2024/25 the Council’s plans remain
affordable, prudent and sustainable. The report also includes detailed
information on the repayment profiles and future estimates of Loans Fund
Advances.
Page 92 of 200

Page 93

10.4 The estimate of Council’s Consolidated Loans Fund (CLF) rate for the year
increased from 2.76% in 2023/24 to 3.22% in 2024/25. This was due to higher
interest rates on the new borrowing and reducing returns as investment
balances reduced. The CLF rate in future years is projected to gradually rise
further in the next few years before levelling off around an estimated average
of 3.4% over future years on current projections.
11. Impact Value Assessment
Annual Treasury Report 2024/25 (Adobe PDF documents)
12. Appendices
Appendix I – PWLB Interest rates 2024/25.
Page 93 of 200

Page 94

Page 94 of 200

Page 95

PWLB INTEREST RATES 2023/24
(Certainty Rates)
4.00
4.25
4.50
4.75
5.00
5.25
5.50
5.75
6.00
6.25
01-Apr-24 01-May-24 01-Jun-24 01-Jul-24 01-Aug-24 01-Sep-24 01-Oct-24 01-Nov-24 01-Dec-24 01-Jan-25 01-Feb-25 01-Mar-25 01-Apr-25
1 Year
5 Years
10 Years
20 Years
30 Years
50 Years
7
Page 95 of 200

Page 96

Page 96 of 200

Page 97

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality
___________________________________________________________________
Committee or Board: Full Council
Date of Meeting: 7 May 2025
Report Title: Transformation & Change Programme Update
Report Number: 25/113
Report Author: Charlene Guild, Strategic Lead – Projects &
Programmes (interim)
Organisational Lead: Thomas Glen, Chief Executive 
___________________________________________________________________
1. Purpose
1.1 The purpose of this Report is to provide full Council with an update on
progress of the Transformation & Change Programme – Phase Two. This
covers the six-month period from 1 September 2024 to 31 March 2025.
1.2 In addition, the report includes a full progress update and summary of each
individual project/programme of work within the phase two portfolio.
1.3 Sections
1. Purpose
2. Recommendation
3. Background/Context
4. Phase Two - Highlights
5. Programme Management Office Update
6. Conclusion
7. Appendix 1 - Transformation & Change Programme - Phase 2 Project
Summary Updates
2. Recommendation
It is recommended that the Council note:
2.1 Progress made on the Transformation & Change Programme phase two since
the last update report to Finance & Resources Committee on 18 September
2024.
8
Page 97 of 200

Page 98

3. Background/Context
3.1 Our full Transformation & Change Programme was agreed back in 2022, and
we are now into phase two of progress. A full evaluation of Phase one
projects was presented to the Finance & Resources Committee on 18
September 2024.
3.2 Supporting the delivery of the Councils vision of “a Perth and Kinross where
everyone can live life well, free from poverty and inequality,” all of our projects
and workstreams are aligned with the Corporate Plan strategic priorities and
key objectives with defined project outcomes, objectives, and critical success
factors.
3.3 The Transformation & Change programme is an ambitious area of work which
aims to positively impact our communities, our teams, and how they deliver.
This is set in the context of changing demands and resourcing levels which
require a flexible, innovative, and agile approach. With our continued focus on
public service, a focus on those in greatest need, and the support of our teams,
partners, and communities, we will continue to ensure that the people of Perth
and Kinross are at the heart of all that we do, and we evolve to face the
challenges ahead. 
4. Phase Two - highlights
4.1 There have been a number of achievements across the Transformation and
Change programme since September 2024. To ensure that Members are fully
updated on each specific programme or project of work, a full summary
breakdown with details of individual progress and achievements is contained
within Appendix 1. However, it must be noted that as well as the agreed
formal Transformation & Change programme work, Perth & Kinross Council
are committed to ongoing transformational work across the wide range of
services we deliver on a daily basis. These improvements are not being
reported as part of the Transformation & Change programme.
4.2 This year, special recognition must be given, in relation to transformation and
change activity, to the largest infrastructure project to ever be delivered by
PKC, the new Cross Tay Link Road (CTLR).  Officially opened by John
Swinney, First Minister, Grant Laing, Council Leader and Eilidh Doyle,
Athletics Champion on 31 March 2025. Known as Destiny Bridge, the CTLR
has taken many years of planning, development, consultation, a total
investment of around £150 million and of course, hard work to come to
fruition. Community engagement was key with many public consultations,
community benefits, information sessions and local job opportunities. In
addition, this project will unlock economic potential in the area by opening up
further areas for development, attracting inward investment, improving local
transport and traffic flow while reducing traffic and pollution into Perth City
Centre and enhancing pedestrian and cycle safety.
Page 98 of 200

Page 99

4.3 Over the past six months, the phase two programme has reported the
following achievements:
 Leadership Phase Two savings of £742k already identified for 25/26 with
a target of £1.6m over 3 years from 24/25 (308k delivered).
 Strategic Commissioning & Procurement savings of £350k in 25/26 with
a target of £1.5m over 3 years from 24/25 (£400k delivered).
 Secured Fairer Futures funding to expand the Fairer Communities for all
programme into 25/26 and beyond based on past successes.
 Zero Waste and Operations programme have held a wide engagement
exercise with pupils and teachers around the Schools Recycling
improvement project resulting in a renewed drive in this area with pupils
taking forward climate cafes, creating posters, and promoting benefits of
recycling throughout campuses and schools.
 Development of the Career Long Professional Learning Pathways
(CLPL) through our Additional Support Needs programme and
improvement of support and guidance for 16+ transitions.
 Launch of the Copilot Pathfinder Programme to integrate Microsoft
Copilot and enhance productivity.
 Options appraisal for a future ALEO model underway with a partnership
working group in place and report to full Council with options and
recommendations in September 2025.
5 Programme Management Office Update
5.1 Our Programme Management Office approach is now fully operational with
clear governance, support, and monitoring structures in place. Regular
reporting mechanisms such as monthly Transformation Board and scheduled
in depth project workshops, are now in place for Executive Leads, project
teams and PMO officers to discuss, agree action and progress. This allows
momentum to continue, accountability to be taken and evidence of
improvement and impact readily available. The PMO continues to promote the
four areas of transformation work within the organisation:
 Transformation – changing the way that we work which will be
significantly different from current ways of working e.g., a marked
change in the form, nature, and appearance of the services we deliver,
how and where we deliver them.
 Service Improvements –improved ways of working led by teams and
services to deliver better outcomes for communities, improved efficiency,
and productivity.
 Re-structure and consolidation – changing the way services and
teams are configured to deliver better outcomes and service priorities.
Page 99 of 200

Page 100

 Budget efficiencies - budget and service reductions which maximise
available funding and focus on agreed priority areas.
5.2 Phase one of the programme used a combination of these approaches to
make savings, shift expenditure to cover emerging new priorities and help
deliver a balanced budget. We reported on this at Finance & Resources
Committee on 18 September 2024 and the paper can be found here.  We are
continuing this success into phase two and have brought together areas of
corporate and operational work where there are particular similarities, overlap
or synergy into multi-faceted transformation programmes – like Fairer
Communities for All which includes our community engagement and multi-
disciplinary locality working projects.
5.3 We have also continued to remain flexible and working agilely on
programmes, allowing us to adapt to changes in local and national policy and
legislation where required. We are also working alongside our other Local
Authority colleagues on a regional basis to consider areas of transformation
that are ripe for a regional approach or where shared services could prove to
be more efficient and effective. In addition, our PMO have also been involved
in the national transformation and change programme being led by the
Improvement Service and SOLACE to consider areas such as procurement,
digital and governance. Ensuring we are aligned to all of these areas has the
potential to impact on the speed of progress internally, however, we are taking
all steps to avoid this where possible.
5.4 Work is also underway to review and update the original Transformation &
Change Strategy approved at full Council in June 2022. This is being
progressed to ensure that our Strategy remains relevant and aligned line with
the Corporate Plan key priorities. Once all amendments are finalised and
consultation has taken place, a final draft will be presented to Finance &
Resources Committee in September 2025 for comment and approval.
5.5 Engagement & Consultation
We have committed to working with our communities and partners through
our Corporate Plan key priorities and individual project delivery. Project teams
have been carrying out extensive engagement activity through service design
events, workshops and focus groups as well as other methods such as online
questionnaires and surveys, virtual meetings, and research. Some of this
activity has been reported through the phase two summary updates found in
Appendix 1. The PMO will continue to provide support and facilitation for
project teams who need it in terms of engagement methods, facilitation skills
and tools to collate data in a participatory way. A revised Communication &
Engagement Plan is due to be presented to Transformation Board in late April
2025 for approval.
Page 100 of 200

Page 101

5.6 We have also introduced a series of regular briefings on Transformation &
Change programmes for Elected Members from October 2024 to date.
Briefings to date have covered a deep dive of specific areas of the
programme such as Whole Family Wellbeing, Additional Support Needs and
Smarter Working as well as an overview of the Programme Management
Office approach and portfolio of projects.
5.7 Leadership Review Phase Two - Cultural Change
Our Leadership Review Phase two has a number of different workstreams to
meet our objectives which have been built around our values and behaviours,
leadership competencies and five foundations of leadership:
1. Lead and maintain strong organisational culture and organisational
behaviours
2. Lead delivery of the Councils vision and priorities through evidence of
high service performance and improvement
3. Lead the Council’s commitment to meaningful and impactful
engagement
4. Lead the Council’s management of its people, resources, organisational
risk, and reputation
5. Lead the Council’s organisational transformation and associated
programme of change and service design
5.8 This has included a continuation of the Leadership Development Programme
for the SLT with outcomes focused on being an effective leader, leading
change and developing and evolving our mindsets as leaders. The person-
centred programme held masterclasses, coaching, hackathon events (large
scale workshops to encourage innovation and collaboration on complex
challenges), action learning sets and lunchtime learning session which
focussed on being a digital leader, strategic management, executive
coaching, self-directed learning, being time rich and building resilience skills.
5.9 As we progress through phase two, turning theory into practice and focussing
on cascading this learning throughout the organisation is a key focus. Using
areas for improvement from our last staff survey in 2024, action plans have
been created for each service area using the PowerBI dashboard and all
Managers have access to this to ensure they are implementing a targeted and
consistent approach.
5.10 In addition to the Cultural Change programme, the Leadership Phase Two
programme will also deliver savings, as highlighted in section 4.2 in relation to
service redesign, workforce planning and transformation and change.
5.11 Risk
Ensuring we have a clear and overarching understanding of risks in relation to
our Transformation & Change programme has been a priority over the past 12
months.
Page 101 of 200

Page 102

To ensure all the necessary information was available, we have worked with
an external consultant to develop a Transformation & Change risk profile and
accompanying registers for a number of individual projects. All of this data is
stored within the PK Performs system, linked to our corporate performance
data and allowing for easy access and reporting through the PowerBI
dashboard.
5.12 There is regular reporting on new, emerging or changing risks to the
programme at each Transformation Board. As a result, areas of action,
monitoring and mitigation are discussed and agreed accordingly.  In addition,
through Transformation & Change has been included within the Corporate
Strategic Risk Register to highlight the high profile and reputational risk of this
area of work. 
5.13 Current risks in this area include workforce capacity, particularly resources to
undertake key transformation & change work, financial investment, and
commitment to implement real transformation and change initiatives and
competing priorities at an organisational level.
5.14 Best Value Audit
The theme of our Best Value audit in 2025 is Transformation: How councils
are redesigning their services to deliver services more efficiently. This process
started in early April and will cover a review of relevant information, additional
case studies of successful transformation projects and meetings with relevant
people from the Council. Areas of particular interest include our organisational
plans for transformation, programme management, community and partner
involvement and impact of transformation projects. We are in the fortunate
position to be able to provide a comprehensive evidence portfolio and
demonstrate where our previous transformation work has impacted positively
across our areas of service delivery. The findings of the audit and final report
should be presented to full Council in September 2025.
5.15 Partnership Working
The Transformation and Change programme continues to seek new
innovative ways of working internally and externally with partners and
colleagues to ensure we meet the aims and objectives of our Strategy. Over
the past six months, we have introduced service design workshops across
individual projects which included partner involvement in developing
processes and services in future. In addition, many projects involve external
partners with interdependencies across workstreams. For example, the ALEO
Review project has a steering group with membership across all ALEO’s and
PKC to ensure partners are closely aligned, informed at every step, and have
accountability for the progress of the project.
Page 102 of 200

Page 103

5.16 HSCP Transformation & Change Programme
We have continued to work and meet regularly with our HSCP colleagues on
Transformation & Change activity to ensure we are maximising opportunities
for collaboration and joint working. For example, the Care at Home redesign;
Discharge Without Delay improvement work and the creating Integrated
Health & Social Care Locality Teams intersect with PKC. The HSCP mirrors
the PMO approach and is re-examining its Transformation Programme to
align with the IJB Strategic Plan to 2027 and drivers in relation to population
change, needs, demand and cost pressures. See below the approved
programme which covers both health, social care and integrated services.
5.17 We are working together to embed a service design approach across the
programmes and sharing training opportunities where appropriate.  The HSCP
reports on its Transformation Programme to the Integrated Joint Board’s Audit
& Performance Committee to monitor progress and receive strategic direction.
Page 103 of 200

Page 104

6 Conclusion
6.1 The Transformation & Change programme has made good progress over the
last six months with the Programme Management Office proving to be
instrumental in focussing, co-ordinating and providing regular monitoring
across all areas of the programme. This has led to improved consistency of
approach, clear support structures in place and more accountability in terms
of monitoring and reporting. Projects are meeting key milestones and
timescales, already realising some early benefits which are highlighted within
this report.
6.2 As well as reporting on overarching progress through formal Committee
reporting structures, we will continue to regularly engage with our Elected
Members informally through briefings across specific project areas,
achievements, and challenges.
6.3 Before our next formal report, the main areas of focus for the Programme
Management Office will be ensuring the best value report reflects our
commitment and hard work in this area, ensuring that all the upcoming
Options Appraisal exercises are concluded and recommendations presented,
reviewing and updating our governance framework (Strategies and Action
Planning).
7. Impact Assessment Value
The Impact and Value Assessment (IVA) undertaken in relation to this report
is available here.
8. Appendices
7.1 Transformation & Change Programme - Phase 2 Project Summary Updates
Page 104 of 200

Page 105

Appendix 1
Transformation and Change
– reshaping our organisation
Phase Two Project Summary
Updates – May 2025
8
Page 105 of 200

Page 106

Appendix 1Contents Page
Projects
1. Additional Support Needs
2. Artificial Intelligence
3. ALEO’s Review
4. Business Systems
5. Customer Services Transformation
6. Employability Service Review Project
7. Fairer Communities for All Model
8. Leadership Phase 2
9. Perth Secondary Estate Review
10. Public Transport in the Community
11. Strategic Procurement & Commissioning Project
12. Tayside Contracts Review
13. Whole Family Wellbeing (WFWB) programme
14. Working Smarter
15. Zero Waste & Operations
Page 106 of 200

Page 107

Appendix 1Programme Name
Additional Support Needs (ASN)
Programme Description
The Programme aims to transform educational provision by enhancing the quality of
learning environments and specialist support for children and young people, ensuring
equity in education and delivering best value. It seeks to reduce expenditure on expensive
external placements by the Inclusion Service, redirecting the budget towards earlier
intervention and prevention in mainstream provision. Additionally, the Programme will
establish clear ASN pathways, develop ASN provision at all levels across the authority,
increase capacity for future PKC placements, reduce the number of pupils placed outside
PKC ASN provision, design a sustainable transport process, and provide regular reporting
to monitor the financial position. This will help comply with legal requirements and ensure
quality provision is delivered.
Programme governance structure
Executive Sponsor Thomas Glen
Senior Responsible Owner (SRO) Fiona MacKay
(Programme Sponsor: David Macluskey)
Programme Manager Jaclyn Meikle
Current Programme Timeline
 Programme start date 31/10/2023
 Planned Programme completion date 31/10/2028
This Programme is intended to support a fundamental change in our approach to
Additional Support Needs. Within PKC This Programme is scheduled to complete in
October 2028; however, the Programme outcomes will be delivered over a much longer
term.
Current status of the Programme
The project is progressing well with all workstreams on track. The project is planned to be
delivered in 3 phases and the last twelve months have been focussed on establishing the
data, information, infrastructure and support to allow for the delivery of Phase 1 Intensive
Support Provision. The formal consultation around this phase is ongoing, currently
scheduled to be completed by the end of June this year with the Phase 1 ISP anticipated
to be operational for the start of the academic year 2025/2026.
Page 107 of 200

Page 108

Appendix 1Agreed Programme Outcome(s) (Phase One)
The Programme is anticipated to deliver the following:
1 Revised Staffing Standard and Allocation Model (Core & Exceptional) for
classroom-based support staff for implementation from 2025/6.
Reviewed and re-aligned support staff (PSA/PSSW) to meet need.
3 School leaders and staff clear on support roles & remit.
4 Identified staff groups are clear on responsibilities in relation to meeting duties of
ASL Legislation.
5 Annual ASN Learning Programme is made available to all staff that is accessible
and inclusive.
6 Increased number of staff have completed certified ASN inclusion training.
7 Progression Pathways for all staff groups.
8 Create communication enabling environments where almost all children, young
people, staff and families feel safe and able to learn.
9 Recommendations identified in relation to:
a) Early intervention to reduce demand and escalation through staged levels
b) The physical environment of inclusive classrooms - Learning Spaces,
Experiences and Interactions
c) Supporting parents
10 Improved local access to Intensive Support provisions (ISPs)
11 Reduced travelling distances for children and young people accessing ISPs,
resulting in reduced travel costs.
12 Standardised learning environments within Intensive Support provisions (ISPs)
13 Revised support staffing model for Intensive Support provisions (ISPs)
14 PKC 16+ Transition Framework that enables young people to have a more
graduated approach as they move from school to employment, education or
training.
15 Clear pathway(s) for young people not meeting criteria for established pathways.
16 Improved consistency of delivery of post school planning & preparation support.
17 Compass App embedded to support post school transition.
18 Redesigned Speech & Language Therapy contract for the delivery of assessment
and intervention for children and young people in education.
19 Improved access to Speech & Language Therapy for children and young people in
education
20 Reliable ASN SEEMiS Data.
21 Trained SEEMiS users supported by a revised SEEMiS Guidance Document.
22 School leaders will effectively use SEEMiS data to inform the development of their
Universal Offer within schools.
23 Partners will have access to the analysis of SEEMiS data to inform Future
Planning within other sectors.
Page 108 of 200

Page 109

Appendix 1Outputs delivered since last update
1 Support Staff (Pupil Support Assistants (PSAs)/Primary School Support Workers
(PSSWs)
 Allocation: Proposals for revised model for 2025/26 onwards
 Role & Remits: Revised Job Profile for classroom-based support staff drafted
for consultation, improving clarity of role for staff and flexibility of staffing for
schools
2 Career Long Professional Learning (CLPL)
 Progression Pathways: Pathways for PSAs, Community Link Workers (CLWs),
and Community Link Assistants (CLAs) all now developed.
 PSA Induction: Establishing core offer to improve initial skill base, including
supply staff network ‘offer’
 System Change: Development of a systematic approach to the collation &
review of routinely captured information to inform CLPL planning
3 16+ Transitions
 Predictions of need: Health Audit identifying S3-S6 pupils currently at risk of
missing assessment for intellectual disability diagnosis
 Guidance Development: Improving access to and consistency of support –
single- & multi-agency
 Parent/School/HSCP collaborative planning: Completion of Compass App trial
– informing further developments
 Pathway mapping: includes identifying gaps in suitable post-school
opportunities – identifying risks
4 Reviewing Service Level Agreements (SLAs) - Speech and Language Therapy
 Contract Redesign: Review developing Public to Public contract with NHS
Tayside to provide greater transparency/targeting of available funding to meet
the needs of children & young people in ELC settings/Schools
5 Data Informed Decision Making (DIDM)
 Inclusive Practice Power Bi development to enable schools to track, monitor,
self-evaluate & plan (universal offer, training)
 Reliability of data – developing guidance, training and routine auditing
programme
6 Inclusive Environments
 Audit of physical environment of schools completed - to inform guidance,
training and resources to reduce barriers to learning
 Quiet spaces/reducing dysregulation: Sensory equipment provided for schools
providing enhanced support Aug 2024 and Aug 2025
 School Visits: Practice visits commenced focussing on identifying and sharing
learning from ‘best practice’ in use of sensory resources.
 Funding: Newly available for development of outdoor spaces to support
learning.
7 Intensive Level Support
 Improving communication/reducing dysregulation: Core ICT communication
resources kit and sensory equipment identified and procured
 Staff grading: Review underway
 ISPs: Expansion proposals to deliver locality model agreed by PKC Learning
&Families Committee, next steps - Statutory Consultations (commencing
24/3/25).
Page 109 of 200

Page 110

Appendix 1Project Name
AI Project
Project Description
This programme will be designed to position PKC at the forefront of digital transformation
and align with our overarching goal to leverage cutting-edge technology to drive efficiency,
enhance service delivery, and foster innovation across all facets of our operations.
Project governance structure
Executive Sponsor Clare Mailer
Senior Responsible Owner (SRO) Alan Taylor (Programme Manager Steven
Watt)
Project Manager Chris Wright
Current Project Timeline
 Project start date 01/11/2024
 Planned project completion date 31/03/2028
Current status of the Project
The AI and Automation Strategic Business Case was presented to the Transformation
Board (TB) in September 2024.
It highlighted some of the potential benefits of AI and automation for the Council. The
Board acknowledged the strategic importance but noted the need for detail on return on
investment (ROI) and savings projections.
Subsequently, since the budget setting at full council, an investment to take forward a
strategic AI programme has been agreed.
Page 110 of 200

Page 111

Appendix 1Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
1 Operational Efficiencies and Scalability: By automating routine tasks, PKC not
only achieves operational efficiencies that benefit residents, businesses, and
partners but also enhances our ability to scale service delivery efficiently. This
strategic use of AI and automation enables us to meet the growing demands of
our communities without the necessity of increasing our headcount.
2 Enhanced Decision-Making: With AI's predictive capabilities, we can make more
informed decisions that are data-driven and outcome-focused.
3 Innovation and Growth: The integration of AI can foster a culture of innovation,
encouraging the development of new services and solutions that benefit all
stakeholders, including businesses and partners.
4 Community Resilience: AI can enhance the ability to respond to and recover
from events, ensuring that services remain robust and reliable for the community,
businesses, and partners.
5 Economic Development: AI insights can aid in understanding the local economic
landscape, helping to attract, retain, and grow businesses within the community.
6 Collaborative Partnerships: AI can facilitate better collaboration between local
government, businesses, and partners by providing a platform for shared data and
insights, leading to more cohesive and integrated service delivery.
Outputs delivered since last update
Copilot DPIA’s signed off by Customer and Digital Strategic Lead
Copilot Pathfinder Programme - The Copilot Pathfinder Programme is an initiative
aimed at integrating Microsoft Copilot to improve productivity across different
departments. The programme covers the following components: Training and Education,
Community and Support, Monitoring and Compliance, ROI and Benefits Realisation,
Governance and Policies, and Evaluation and Next Steps.
Page 111 of 200

Page 112

Appendix 1Project Name
ALEO's Review
Project Description
To find the best model of delivering leisure and culture services to people across Perth
and Kinross within current financial climate.
To recommend a future delivery model best suited to future needs for ALEO’s that is
capable of:
 Optimising PKC investment in leisure and culture services.
 Increasing back-office efficiencies, including with other partners where appropriate
(for example Perth and Kinross Heritage Trust, Pitlochry Festival Theatre).
 Growing and diversifying new income streams.
 Recommending an appropriate constitutional/governance structure for any new
delivery model on the basis of options appraisal (sole member, SCIO, mutual etc).
Project governance structure
Executive Sponsor Thomas Glen
Senior Responsible Owner (SRO) Charlene Guild
Project Manager N/A
Current Project Timeline
 Project start date 23/08/2024
 Planned project completion date 31/03/2027
Page 112 of 200

Page 113

Appendix 1Current status of the Project
An initial report was presented to full Council in December 2023, setting out a series of
recommendations for ALEO improvement, made by Glasgow Audit, an external auditor.
These recommendations were approved in principle and an options appraisal review
requested – specifically in relation to the consolidation of corporate services across all
ALEO’s. There have been a number of changes to PKC since then with the Head of
Culture & Communities leaving the organisation in April 2024 and the project not
progressing as planned until a new Senior Responsible Owner (SRO) was appointed in
August 2024. A full meeting was held on 23 August 2024 with ALEO Chairs / CEX’s and
PKC Senior Officers where a plan for moving ahead was agreed.  A project working group
comprising ALEO Chief Executive officers and senior Council officers has been
established and is meeting regularly to ensure momentum is maintained. In addition, the
following progress has been made over the last six months: 
 Agreement of overarching project outcomes and critical success factors by group.
 Establishment of Transformation & Change project monitoring process and regular
updates on project progress to Transformation Board and to Elected Member’s
through F&R Conveners, SNP Leaders, S&P Conveners meetings.
 Recruitment exercise to Project Manager (PM) role to take forward the options
appraisal exercise, continue to drive momentum and monitor / report the progress
of wider recommendations with the Glasgow Audit Report 2023. While the post
was advertised in October with interviews in early November 2024, unfortunately
there was no appointable candidate. At this stage, the full working group agreed
that consultancy expertise would be preferred to take forward the options appraisal
exercise.
 Procurement exercise to appoint an external consultant took place initially in
December 2024 but due to competing workloads and other factors, the preferred
consultant was appointed in March and began the work with a full Inception
meeting on 1 April 2025.  This is due to be completed by July 2025 with a full
options review along with recommendations for progress being presented to full
Council on 10 September 2025.
In line with the agreement of the project working group, external consultants have been
commissioned to undertake a detailed options appraisal on the following options:
1. Bring all ALEO’s in house to PKC
2. Bring some ALEO services in house (e.g. consolidation of corporate services from
ALEO’s delivered by PKC) and ALEO’s retain own identity / library services brought back
into PKC
3. Create one new ALEO / two new ALEO’s – streamlining corporate and back-office
services
4. Create one ALEO for culture and sport and considering possible change of status for
Perth Theatre & Concert Hall
This work is scheduled to be completed by early summer with a recommended option
being tabled to Council in early autumn 2025.
Once an option has been approved by Council, a full consultation and engagement
exercise will be undertaken from September 2025 – March 2026.
Following this, implementation of any new ALEO model will take place over the period
April 26 – March 27 which is in keeping with originally stated timescales for the project.
Page 113 of 200

Page 114

Appendix 1Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
1. Ensure a sustainable model of delivery of leisure and culture services in future
2. A more streamlined and consistent approach across all ALEO organisations in
terms of systems and corporate support
Outputs delivered since last update
1 Establishment of project working group comprising ALEO Chief Executives and senior
council officers
2 Successful procurement exercise to appoint an external consultant to carry out
detailed option appraisals. Inception meeting was held on 1 April 2025 with work due
to be completed by July 2025 with a full options review along with recommendations
for progress being presented to full Council in early autumn 2025.
Page 114 of 200

Page 115

Appendix 1Project Name
Business Systems Management Efficiency & Rationalisation Project (BSMER)
Project Description
This project will review all Council business systems / Applications, describing how they
are currently managed; resourced; supported and developed and make recommendations
on the design of a new Digital operating model to support delivery of modern Council
Digital Business.
Project governance structure
Executive Sponsor Clare Mailer
Senior Responsible Owner (SRO) Alan Taylor
Project Manager Dave Turner
Current Project Timeline
 Project start date 01/06/2023
 Planned project completion date 31/03/2026
Current status of the Project
The project has been extended to the end of March 2026, which has enabled the team to
further develop the Application Portfolio and the application lifecycle
Following the successful presentations of Application Landscape documents to Strategic
Leads and their management teams, the project team have been focussing on scheduling
Application Landscape Review Sessions.  These sessions are to gather more information
about applications which we can use to develop our application portfolio.  This data has
already proved useful for FOI requests, out of contract systems and potential
procurements.  
Decommissioning process, which is part of the application lifecycle, is currently being
developed.  Involvement in Flare migration and more recently Swift decommissioning
being used to help inform this process. 
Liaison work with senior management with Education and Learning is ongoing to
investigate scope of work required to create an application portfolio of all software
application used within all of our schools. 
Work is ongoing to develop the Application Lifecycle process: from defining and specifying
initial application requirements; procuring the most effective software solution; effective
and efficient ongoing contract management for the application; establishing and robust
decommissioning framework and methodology.
Page 115 of 200

Page 116

Appendix 1Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
1 To create a detailed picture of how people / resources are allocated across the
organisation supporting Council business systems and clarify total cost of
ownership for business systems and associated capital / revenue budgets.
2 To create a Business Capability Model describing how Business systems
collectively deliver on Council objectives.
3 Introduce a new operating model for optimal delivery of modern digital business
including: a revised Business Relationship and Business Partnership Agreements
between services and IT; a defined model / approach for decommissioning /
retiring Business systems.
4 Improve records management compliance.
5 To create a detailed picture of all contracts associated with all business systems
capturing all key procurement and contract information, allowing for better contract
management in the future.
Outputs delivered since last update
 Survey developed released and reviewed
 Application data was collected from various sources and recorded centrally in a
master spreadsheet; this is being developed int an application portfolio. (Data
sources often proved to be incomplete or inaccurate, data therefore had to be
checked leading to delays)
 Creation of Application Landscape Packs for Strategic Leads.  Detailing application
details, costs, contracts
 Application Landscape Pack presented to all Strategic lead sand their
management teams and signed off. 
 As part of the Decommissioning workstream requirements documents were
developed for Flare – regulatory Services and Glamis – Licensing
 Creation of application master spreadsheet has revealed applications out of
contract or not used.  This has led to savings in both ending the contracts or
renewing the contract with fewer licenses. 
Page 116 of 200

Page 117

Appendix 1Project Name
Customer Services Transformation
Project Description
To develop a new model for customer services by adoption of a customer-centric
approach to customer contact management which will substantially simplify our current
arrangements; enrich jobs and empower customer service staff to satisfy most requests at
first point of contact. The model will provide the opportunity to blend digital customer
channels, assist vulnerable citizens by an appropriate channel, operate more effectively in
and across localities, to achieve more with less resources, less effort, and less
bureaucracy.
Project governance structure
Executive Sponsor Alan Taylor
Senior Responsible Owner (SRO) Steven Watt
Project Manager Liz Colledge
Current Project Timeline
 Project start date 01/10/2024
 Planned project completion date 31/03/2026
Current status of the Project
The project has progressed well with the majority of the Phase 1 outcomes now delivered,
please see section below for details.
Initial meetings are ongoing at service manager level regarding consolidation of Housing
locality calls. Following these, service redesign workshops will be undertaken with the
wider stakeholders.
Once Housing Service functions have been consolidated, this will represent the
completion of Phase 1 of this project.
Phase 2 of the project will focus more on our approach to delivery of customer services
and while it will be delivered as an individual project, it will be dependent on the wider
cultural change programme being delivered through other areas such the Leadership
Phase 2 project.
A revised Customer Service Strategy and associated Customer Service Standards and
Charter is currently being drafted. 
Page 117 of 200

Page 118

Appendix 1Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
1 Consolidation of Dispersed Customer Services
2 Delivery of recurring revenue savings
3 Improving access to Council services for our customers
4 Develop draft revised customer service strategy
5 Develop draft revised customer service standards
Outputs delivered since last update
All non-Housing Services customer service staff have now been consolidated under one
Service. 
The Customer Service Centre (CSC) have successfully consolidated parking calls and are
on track to consolidate Housing Repairs calls on 31 March 2025.
Savings from the Phase 1 of the project have been delivered
Page 118 of 200

Page 119

Appendix 1Project Name
Employability Service Review Project
Project Description
To develop an implementation plan to deliver a strategic and co-ordinated employability
service for PKC. Designing a new model that makes best use of the current expertise,
skills, and resources to ensure a more cohesive and effective service. This will involve
maximising the reach and impact of our collective resources and delivery of services and
operating in a more connected and integrated way putting people and their needs at the
centre of the redesign.
Project governance structure
Executive Sponsor Clare Mailer
Senior Responsible Owner (SRO) Serge Merone
Project Manager Alison Seggie
Current Project Timeline
 Project start date 01/08/2024
 Planned project completion date 30/04/2025
Current status of the Project
The project is well underway with the information gathering stage now complete
(questionnaires and follow up interviews), with officers now working on how that
information will be presented. The information is being analysed and used to inform what
the likely options/improvement actions are for future delivery. The review is being
supported and underpinned by a Design Led Thinking approach. Three initial workshops
have been held with the final workshop scheduled for the 22 April after the Easter holiday
period. Some additional work is still underway in terms of stakeholder input and
benchmarking with other Local Authorities. A report will then be presented to the
Transformation Board in late May. With implementation of the recommendations to follow.
Page 119 of 200

Page 120

Appendix 1Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
1 Through maximising the reach and impact of our collective resources, we will
provide a more integrated and effective offer for clients/individuals looking for
support to upskill and access employment.
2 That we operate in a more connected, integrated way, considering all the
resources (people and financial) at our disposal.
3 We will provide a more integrated and effective offer for local businesses looking
for support with recruitment and skills development.
4 We will ensure we use data, intelligence, and analytics to better inform decision-
making and target services.
Outputs delivered since last update
1 Questionnaires to key internal employability service/support stakeholders, these were
followed up face to face in-depth interviews.
2 Initial half-day Design Led Thinking Workshop held with a wide range of internal
delivery/support partners
3 Two-day follow-on in-depth workshop held with a smaller cohort to explore our current
key challenges
4 These workshops were facilitated by an external expert on Design Led Thinking
Page 120 of 200

Page 121

Appendix 1Project Name
Fairer Communities for All Model
Project Description
The "Fairer Communities for All" model focuses on creating inclusive, equitable, and
sustainable communities where everyone has access to essential services and
opportunities. This model ensures that:
 all community members have a voice in decision-making processes and access to
service and resources.
 there is fair access to healthcare, housing, education and employment
opportunities.
 there is effective and strong partnership between communities, the council,
community planning partners, voluntary sector and businesses to respond to and
address need.
 resilient communities are developed and sustained.
The overall aim of this model is to build sustainable communities where everyone can
thrive and live life well, free from poverty and inequality.
The model will knit together elements of the multi-disciplinary locality working (MDLW)
programme and our community engagement transformation project to strengthen the
efficiency and effectiveness of community engagement and empowerment across the
Council.
Project governance structure
Executive Sponsor Clare Mailer
Senior Responsible Owner (SRO) Elaine Ritchie
Project Manager Paul Smith
Current Project Timeline
 Project start date 06/11/2023
 Planned project completion date 31/03/2027
This project is intended to create the environment which supports a fundamental change
in our approach to delivering services to support our communities over the long-term. This
project (which establishes this environment) is scheduled to complete in March 2027;
however, the project outcomes will be delivered over the much longer term.
Page 121 of 200

Page 122

Appendix 1Current status of the Project
This project builds on previous work in selected localities to pilot developing a locality
based multi-disciplinary working approach. As this work progressed it became apparent
that the community engagement transformation project had a lot of synergies and overlap
so the decision was taken at transformation board to combine the two projects. This
approach and the national interest in the work to date from the Improvement Service and
Scottish Government has enabled us to attract funding from the Fairer Futures fund to
scale up and rollout this placed based approach in more communities in Perth and
Kinross. We have just recruited a project manager and are starting to implement this
phase of the joint transformation project.
Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
1 Stronger relationships with our communities, creating a shared sense of purpose.
2 Deliver services to communities in need through a focused and targeted approach.
3 Deliver services that are more responsive to the needs within local communities,
and to work together in partnership to address them with a clear focus on early
intervention and prevention.
4 A collaborative approach to meet the needs of local communities, shifting
resources to meet needs.
5 Continuing to tackle discrimination and prejudice, promoting equal opportunities for
all, creating a fairer Perth & Kinross
6 That decisions at a locality level are based on evidence and are made
collaboratively, working with all stakeholders, including Elected Members resulting
in streamlined levels of bureaucracy.
Outputs delivered since last update
1 Multi-disciplinary team established in Highland Perthshire, key issues identified and
community engagement underway. Links with Property Asset review in Pitlochry.
2 Activity in Letham including Love Letham community wealth building, establishing
multi-disciplinary working in Letham hub appointing a locality lead and developing a
multi-disciplinary team
3 Multi-disciplinary approach to delivering the CPP community action plan for Coupar
Angus
4 Fairer Futures Funding secured, and Programme manager appointed
5 Six communities in high need identified and actions to progress with this work is
underway.
6 Wider Fairer Communities programme developed for Perth and Kinross as a whole
Page 122 of 200

Page 123

Appendix 1Project Name
Leadership Review Phase 2
Project Description
 Deliver future proofed operating models which will generate improved service
delivery focused on our priorities
 Deliver improved performance and generate efficiencies including the approved
savings targets
 Create and deliver a robust workforce planning process which will underpin the
delivery of the new operating models and related budget efficiencies
 Complete the delivery of Year 2 of the Evolving Leadership Development
Programme
 Embed the Leadership for All programme
 Review and deliver performance related documentation which aligns with the 5
Foundations of Leadership and relevant elements of the Leadership development
programmes
 Create an environment where cultural behaviours are embraced and evidenced
Project governance structure
Executive Sponsor Thomas Glen
Senior Responsible Owner (SRO) Greg Boland
Project Manager
Current Project Timeline
 Project start date 01/10/2024
 Planned project completion date 31/03/2027
Current status of the Project
A project steering group has been established with a meeting schedule put in place.
A proposal based upon the evaluation of Year 1 has been developed and agreed with the
Strategic Leadership Team to take forward the second year of the Evolving Leadership in
Practice programme. In addition, also the elements of a PKC wide offer designed to
cascade key principles to the next levels of leadership. Work is underway to recruit to the
additional fixed term PR9 post put in place to support the delivery of the programme.
A review of service workforce plans has been carried out and work will now continue to
ensure that these are future proofed, “living” documents which reflect on-going changes
and challenges in each service.
Page 123 of 200

Page 124

Appendix 1Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
1 Development of operating models, using service design and business
improvement, to deliver the Council’s strategic priorities.
2 Implementation of revised structures achieving total savings from Leadership
Review phase 1 and 2 delivering £1.7m organisation-wide savings at PR8 and
above by April 2026.
3 A workforce plan for Perth and Kinross Council which clearly identifies leadership
roles (numbers, grade, responsibilities).
4 A streamlined leadership model across the organisation and delivery operating
models aligning structures and leadership practices with strategic priorities and
objectives and the five foundations of leadership
5 The completion of the Evolving Leadership programme and implementation of the
Leadership for All programme which will embed the leadership competency model
at all levels of leadership and reflected in PDD documentation.
Outputs delivered since last update
Evaluation of Year 1 of the Evolving Leadership in Practice programme.
Implementation of Year 2 of the Evolving Leadership in Practice programme.
Workforce plans are in place for Strategic Lead areas.
Page 124 of 200

Page 125

Appendix 1Project Name
Perth Secondary Estate Review
Project Description
Education is integral to delivering our corporate priorities relating to children and young
people, the wider health and wellbeing of people in Perth and Kinross and meeting our
climate change/climate justice obligations. This project will consider how the Secondary
Learning Estate in Perth City facilities are best aligned with the corporate priorities. 
Project governance structure
Executive Sponsor David Macluskey
Senior Responsible Owner (SRO) Stephen Crawford
Project Manager Brian Reid
Current Project Timeline
 Project start date Oct 2024
 Planned project completion date Dec 2027 (Assuming Statutory Consultations)
Current status of the Project
Ongoing – Project Board Formed, initial output works undertaken, following stakeholder
engagement the project is now establishing potential option appraisals to be developed
and considered by the board to agree which are further developed.
Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
The review will consider how best to:
 ensure the Perth City secondary learning estate is well aligned with service need
and corporate estate priorities.
 to improve operational efficiency of school facilities/community facilities.
 Consider compliance with statutory carbon emission reduction targets.
 Consider future requirement for substantial investment in multiple buildings.
 Committee approved way forward.
Outputs delivered since last update
Stakeholder engagement exercise through the consultation hub, Data gathering including
roll projections, housebuilding projections, condition surveys, analysis of existing sites.
Analysis of educational benefit.
Page 125 of 200

Page 126

Appendix 1Project Name
Public Transport in the Community
Project Description
To develop a plan for a transport model that meets the needs of all our communities which
is affordable, sustainable, efficient, and effective. This model will cover the provision of
local bus services, mainstream home to school transport, ASN home to school transport,
HSCP and children and families' transport.
Project governance structure
Executive Sponsor Clare Mailer
Senior Responsible Owner (SRO) Elaine Ritchie
Project Manager Margaret Roy
Current Project Timeline
 Project start date 01/04/2024
 Planned project completion date 01/03/2027
Current status of the Project
Year 1 of the project focussed primarily on the discovery phase, however, during this time
the Public Transport Unit has delivered several key pieces of work and small tests of
change both in terms of Public Transport and home to school transport, these are
highlighted below.
As we move into the next phase of the project, Passenger Transport and Community
Transport Consultants have been engaged, and they have commenced work on the
engagement strategy and process in addition to mapping out all current forms of
contracted transport throughout Perth and Kinross. 
In addition, the consultants are also developing a Community Transport Strategy and
targeting key issues facing our Community Transport Groups.
Benchmarking of home to school transport costs and policy in all other 31 LAs has
commenced and a review of our school transport policy is about to be started, including
reviewing current transport arrangements to ensure best value.
In addition, a similar review has commenced to ensure we are effectively and efficiently
delivering the transport needs of clients from the Health and Social Care Partnership and
our Children and Families’ service.
To support this, we are continuing to ensure effective communication with key stakeholder
through events such as elected member briefing sessions.
Page 126 of 200

Page 127

Appendix 1Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
A transport model that meets the needs of all our communities which is affordable,
sustainable, efficient and effective. This model will cover the provision of local bus
services, mainstream home to school transport, ASN home to school transport, HSCP and
children and families’ transport.
Outputs delivered since last update
1 Free Local Bus travel throughout Perth and Kinross on the first Saturday of every
month commenced on Saturday 01 June 2024.  This was publicised through the
Council’s and bus operators’ social media platforms as well as on street and on bus
posters, and RTI screen messaging.  Passenger surveys carried out via interviews
on street highlighted that the fact that it was free did encourage bus use both in
terms of cost not being a barrier to travel and modal shift from car to bus. 
2 Bespoke bus timetable leaflets were also produced to promote specific rural local
bus services, and this will continue in 2025.  These were well received by
passengers who commented how they were very easy to understand and very
useful.
3 A video informing how to read a roadside bus timetable and travel on a bus service is
in the process of being produced as many members of the public complain that they
cannot understand bus timetables.
4 Regular posts are scheduled on the Council’s social media channels to promote all
three of the free national bus passes and as from April 2025, a “Bus Service of the
Month” will be featured as well.
5 As a test of change initiative, two new Community Transport Groups were provided
with Council owned MPVs to deliver local transport solutions in their rural areas. 
Kirkmichael Community Transport Group commenced operating their MPV on 25
July 2024.  This new flexible operation also replaced fixed route off peak journeys
which had been operated under contract to the Council.  Muthill Community
Transport Group commenced operating their MPV on 26 October 2024 and quickly
received very positive feedback on how the service had been life changing for many
residents, particularly in terms of attending medical appointments in Ninewells. 
Aberfeldy and the rural area between Blairgowrie and Dunkeld will see their MPVs in
operation later in 2025.
6 Further tests of change were implemented with Glenfarg Community Transport
Group (GCTG) being directly awarded a second, much longer, local bus service. 
The flexibility of service and vehicle type that Glenfarg Community Transport Group
use, coupled with their outstanding level of reliability has seen the passenger
numbers on this route, which operates in West Kinross-shire increase and receive
very positive passenger feedback. To further support GTCG, the Council has
purchased a brand new, low floor, wheelchair accessible minibus and the group will
repay the Council for this over 8 years.  This allows them to cease leasing one of
their minibuses at a significant cost. It is also helping to reduce their costs as
repayments for the new minibus are at a lower rate per month, allowing them to build
a more financially sustainable fleet.
7 Further support was offered to the wider Community Transport Community in Perth
and Kinross by delivering the minibus disposal scheme. Three more community
transport groups have now taken ownership of their new minibuses over the past few
weeks. In addition, £65k of Council Funding was awarded to 18 Community
Transport Groups in Perth and Kinross to support them in providing essential
transport for many residents across the whole of Perth and Kinross.  The PTU are
currently collating feedback and stories of lived experience from the group and their
members to showcase what this funding achieved.
Page 127 of 200

Page 128

Appendix 18 To enable greater and more in-depth data monitoring of our contracted local bus
services to inform decisions about our local bus network, the PTU have been
working with IT colleagues to produce a Power BI dashboard to this end.  The first
phase of this is now complete and ready to use.
9 In terms of Home to School Transport, operationally two small tests of change are in
progress in that a Council pool car and Council employee are delivering a
mainstream home to school contract and GCTG are also delivering a home to school
transport contract.  These will be evaluated against a commercial operator
undertaking these and which is the most effective model.
In addition, a review is underway on ASN transport delivery to Fairview School to
establish the most effective model of delivery in future.
10 A review of the Home to School policy and procedure is currently underway,
including benchmarking with other local authorities. This area will require extensive
engagement with schools, parents, and carers to ensure everyone is informed and
involved. As we progress with the project, we will implement additional small tests of
change that result in efficiencies where appropriate.
11 The Public Transport Unit has been working with IT colleagues to design and
produce a new school transport database which is now in use and is intended to
allow a greater suite of reporting and remove the need for duplication of pupil details
entry.  The improved reporting will enable improved interrogation of data to inform
possible efficiencies.
12 Improvement works are currently being undertaken internally in Perth Bus
Station with a view to focussing on the external parts of the building once this
is complete. 
Page 128 of 200

Page 129

Appendix 1Project Name
Strategic Procurement & Commissioning Project
Project Description
To design and implement a new operating model for strategic procurement and
commissioning to improve efficiency and optimise the value and benefits of our
purchasing power. Helping us to better align spend with need and address pressures of
changing demands. Optimising the public value of the procurement function and
consolidated relevant skills and expertise across the organisations.
Project governance structure
Executive Sponsor Thomas Glen
Senior Responsible Owner (SRO) Lisa Simpson
Project Manager
Current Project Timeline
 Project start date 16/01/2023
 Planned project completion date 31/03/2027
Current status of the Project
The Procurement and Commissioning Transformation project is a five-year programme of
works comprising of a number of different workstreams all contributing to the delivery of
our desired outcomes. The project is now entering its third year and details of outputs
delivered are described below. A project team is firmly established and is working closely
with all stakeholders to continue on the journey of transforming our procurement and
strategic commissioning.
Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
1 An effective, outcome-focussed operating model for the procurement and
commissioning of goods, works and services for the Council.
2 Council spending is better aligned with need and addresses pressures of
changing or increasing demand.
3 Where relevant, spend is based on an assessment of need, linked to the priorities
of the Council’s Corporate Plan and Strategic Commissioning Plan of the IJB as it
refers to services delivered by the HSCP on behalf of the IJB.
4 More effective strategic and financial planning by giving oversight and challenge
as to why, what, how and when the organisation spends/invests for the future.
5 Optimised the public value of the procurement function and where appropriate
consolidates relevant skills and expertise presently dispersed across the
organisation.
6 Supports innovation in terms of customer centred service design and delivery.
7 Creates market disruption/challenges monopoly markets.
8 Supports and promotes sustainable procurement and a circular economy model.
9 Supports and promotes community wealth building.
10 Supports a whole life approach for procurement and commissioning capturing
specification design, market intelligence, commissioning processes, contract
management, delivery of outcomes, contract review and future commissioning.
Page 129 of 200

Page 130

Appendix 111 Identifies and creates opportunities for commercialisation/income generation.
Outputs delivered since last update
1 New five-year Sustainable Procurement Strategy PUBLISHED
2 Design of new “test of change” operating model
3 Contract and Supplier Management (CSM) Toolkit LIVE:
 CSM Toolkit (guidance, process maps and templates) launched.  Support
being provided to contract managers with use of toolkit, contract
management and review of contract variations.  Internal CSM training being
developed to support Toolkit – aiming to be available beginning May 2025.
 Efficient management of our contracts and suppliers is critical to gaining
maximum value from our contracts, including economic, social and
environmental benefits as well as the key contractual outcomes, at the same
time as managing contractual risk.
 The Toolkit is designed to be an easy point of reference for all staff with
contract management responsibilities. Templates and process maps bring a
consistent approach across the Council and ensure that all contract
management activities are appropriately documented.
4 Digital Category Strategy developed (awaiting Strategic Lead approval):
 Strategy approved by Procurement & Commissioning Transformation Board
on 27th January and now awaiting Strategic Lead approval.  Work has
commenced on developing an action plan.  Support being provided to end
users with systems that currently have non-compliant or no contract in place.
5 Development of PowerBI Spend Analysis LIVE:
 Designed to provide easy access to spend information which can be used
during both the development of new contracts and contract management. 
Spend data can be analysed in multiple ways – by supplier, service area,
geographically, time.  Also gives statistics such as spend with PO, spend on
contract, top suppliers, etc. 
6 Adoption of Management Information Platform Scotland (MIPS) LIVE:
 PKC are the first Council to adopt the new Scottish Government procurement
management information platform.  The platform, which brings data direct
from The Hub and Public Contracts Scotland, will improve data standards as
well as significant time saving on statutory annual reporting.
7 Development of Strategic Lead Procurement Performance Reporting LIVE:
 A PowerBI platform developed for Strategic Lead areas.  Examples of
information available in the first release - spend from revenue; total spend;
contracted spend; local spend and with SMEs; PO spend; Breakdown of
spend by vender code business sector and organisational level.
 Each strategic area has their own individual page with targets which they
would like to achieve in local spend, spend with SMEs, contracted sped and
PO spend. Targets to be agreed at Business Partnering meetings. There is
scope to further tailor these to strategic areas own needs given that data
which they require is available.
 This new tool will be updated quarterly at the click of a button – previously
Services were provided with monthly reporting on Excel spreadsheets which
took a minimum of two full days to create.
8 Schools Savings Working Group set up to work on delivering cost savings and
efficiencies across DSM.  Completion of a number of mini projects under this
including janitorial supplies product rationalisation and award of commitment
contract.  Currently working with individual schools to agree suitable routes to market
for (non-school kitchen) food procurement, i.e. home economics, snacks, etc.
Page 130 of 200

Page 131

Appendix 19 Quick Quote e-learning module developed which will free up time within team. 
Awaiting final amendments.  Expected to go live by 1st May.
10 Business Partnering:
 First business partnering meetings held with strategic lead areas, with further
sessions planned. These meetings are designed to support better
procurement planning and performance. This model enables the
Procurement Team to identify and promote opportunities for greater cross-
service collaboration and work towards achieving the objectives set out within
the Sustainable Procurement Strategy. The Business Partnering Model will
be rolled out across all Strategic Lead areas.
11 Protecting our environment:
 Flexible Framework Assessment completed. This tool allows us to determine
and implement relevant actions that will embed good procurement practice
and realise intended sustainable outcomes. Action Plan in place to move
Council to a minimum L1 (Foundation) for all criteria across all topics (People;
Objectives, Strategy and Communications; Process; Stakeholders;
Monitoring and Reporting.
12 Process Maps and Templates:
 A new Contract Strategy template and Exemption template is available to
take account of the Contract Management process which is being
implemented. This seeks to gain information relating to Contract
Management at the initial stage of any tendering exercise to ensure it is
included throughout the process.
 Process maps have been updated to implement timescales. This will support
the aim to move from working on a reactive basis to allow the team to provide
a more proactive service. Failure by end users to comply with timescales will
be reported quarterly to ELT.
Page 131 of 200

Page 132

Appendix 1Project Name
Tayside Contracts Review
Project Description
To undertake a review of the way in which Perth and Kinross Council Interfaces with
Tayside Contracts, in terms of Governance arrangements, the role of elected members,
procurement of services, standardisation of offer. This review will be undertaken alongside
Tayside contracts own transformation programme to ensure that all possible benefits are
realised from this unique arrangement of co-ownership between Dundee, Angus and
Perth and Kinross, the 3 councils who co-own and fund Tayside Contracts.
Project governance structure
Executive Sponsor Clare Mailer
Senior Responsible Owner (SRO)
Project Manager
Current Project Timeline
 Project start date 01/11/2024
 Planned project completion date 31/03/2026
Current status of the Project
 A fact finding study to consider the recommendations made within the previous
report, is scheduled to begin later this year.
 Officers worked with Perth and Kinross members of the TC Joint Committee to
inform the scope of the fact finding study.
 Officers from Perth and Kinross and Tayside Contracts also collaborated in
developing the scope of the Study, this work has had the additional benefit of
strengthening the relationships between both organisations.
 PKC  finance colleagues reviewing charging and accounting information.
 Senior legal officers from both organisations are meeting to discuss concerns
raised by Elected Members regarding governance and process.
 Meetings have been set up with Elected Members to meet with Tayside Contracts
management team.
Agreed Project Outcome(s)
Page 132 of 200

Page 133

Appendix 11 Elected members are clear on their role and the remit of the Joint Committee
2 There is an understanding of the finance, governance and performance
arrangements, allowing assurance of effective and efficient partnership
arrangements with Tayside Contracts.
3 Any additional business opportunities identified, are explored.
Outputs delivered since last update
 Agreed scope for fact finding study, scheduled to be undertaken later this year
 Changes to catering charging have provided greater clarity and helped with
savings targets
 Savings target for catering have been achieved for 2024/25
 New SLA in place for non-school cleaning to deliver further efficiencies in 2025/26
 Tayside Contract Facilities Management services now delivered in line with APSE
benchmarking
 Elected Member and Senior Officer Visit to Tay Cuisine
Page 133 of 200

Page 134

Appendix 1Project Name
Whole Family Wellbeing (WFWB) programme
Project Description
The Whole Family Wellbeing (WFWB) programme has been established to implement the
Scottish Government initiative and associated Whole Family Wellbeing Fund). This
initiative is aimed at increasing the delivery of early intervention and prevention, focused
on holistic family support, when, where, and for as long as it is needed.
The WFWB programme will ensure an increase in universally accessible early help and
support, delivered where and when it meets families' needs. Aiming for a better collective
awareness of available support and how to access it, for both families and professionals, it
will aim to provide support as "joined up" and limit the number of professionals and
services individually involved with families. It will also look to provide families with choice
about support ensuring they are involved in decisions that affect them and that there is
increased collaboration between services and organisations that support families
(including adult services and third sector).
The WFWB programme will encourage increased engagement with, and participation from
children, young people, and families in designing and developing services and support,
ensuring a clear and shared understanding of the needs of families across the whole
system
It will embed the key principles of holistic family support and early intervention and
prevention within structures and systems (stigma-free, needs-based, rights-led),
encouraging and empowering staff to develop innovative family support solutions in
conjunction with the families they support.
The WFWB programme will improve capacity within the workforce to respond to the needs
of families in a holistic way, through effective signposting and support.
Project governance structure
Executive Sponsor Jacqui Pepper
Senior Responsible Owner (SRO) Arun Singh
Project Manager Carol McAuley
Current Project Timeline
 Project start date 01/04/2022
 Planned project completion date 31/03/2028
This project is intended to create the environment which supports a fundamental change
in our approach to supporting our families and communities over the long-term. This
project (which establishes this environment) is currently scheduled to complete in March
2028; however, the project outcomes will be delivered over the much longer term.
Page 134 of 200

Page 135

Appendix 1Current status of the Project
The Whole Family Wellbeing programme is funded through the Scottish Government
Whole Family Welfare Fund, this funding was anticipated to end in March 2026, however,
the Scottish Government have recently announced an extension of the WFWF to the end
of financial year 2026/27. Whilst confirmation of the final allocation for Perth & Kinross has
not yet been received, it is anticipated that the level of funding available will allow us to
continue to deliver the programme. 
The Programme has been focussed on the following general areas:
 Access and Availability - Improving awareness of, and access to services that
support families
 Engagement with Children, Young People and Families.
 Service Design and Delivery: consideration of different ways in which additional
capacity to deliver holistic family support can be achieved.
 Systems Leadership and Collaborative Working.
 Support for the Workforce: looking at opportunities to share learning and good
practice, to identify training needs within the wider community, and promote the
principles of holistic family support.
This work has resulted in many areas if positive developments in supporting our families:
these are outlined in later sections of this document.
The confirmation of additional funding has allowed us to develop a budget through to
March 2028 (although Scottish Government funding is confirmed only to March 2027,
earlier project underspend has allowed for this). This longer timescale allows for an
extended period in which to evaluate positive outcomes and impacts, to plan for
sustainability, and to mainstream funding for projects as appropriate.
Consultation with partners have identified key areas for support for families including
mental health support, addressing child poverty and supporting families where a child has
additional support needs.  Funds have been ear-marked for development in these areas
over the next period of the Programme. Areas of focus are currently under consideration
by partners including the Anti-Poverty Task Force, Child Poverty and Additional Support
Needs (ASN) partners. A decision on targeting mental health support will follow the
publication of the new PKC Mental Health Strategy which is due this year.
Page 135 of 200

Page 136

Appendix 1Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
1 An increase in universally accessible early help and support, which is delivered
where and when it meets families' needs.
2 Better collective awareness of available support and how to access it, for both
families and professionals.
3 Support is experienced as "joined up", limiting the number of professionals and
services individually involved with families.
4 Families are provided with choice about support and are involved in decisions that
affect them.
5 There is increased engagement with, and participation from children, young
people and families in designing and developing services and support.
6 The key principles of holistic family support and early intervention and prevention
are embedded within structures and systems (stigma-free, needs-based, rights-
led).
7 There is increased collaboration between services and organisations that support
families (including adult services and third sector).
8 There is a clear and shared understanding of the needs of families across the
whole system.
9 Staff are encouraged and empowered to develop innovative family support
solutions in conjunction with the families they support
10 There is an improved capacity within the workforce to respond to the needs of
families in a holistic way, through effective signposting and support.
Outputs delivered since last update
1 The Whole Family Support – Directory of Services (located here), has been
established and is being updated monthly, with over 30 additional services and
organisations being added since the directory was launched in January 2024.  A new
resources section, linking families with a range of self-directed support resources has
also been added. As of November 2024, the directory had been viewed by over
1,300 unique users, with over 2,000 tracked views.
2 The Family Support Practitioner Network was launched on 23 October 2024 at an in-
person event at the Perth Civic Hall.  43 practitioners and managers from 24 different
service areas/organisations were present at the event. The theme of the event was
holistic family support, and, alongside presentations from a variety of Third Sector
partners attendees were able to network with colleagues.  A second event was held
on 15th January with a focus on financial support for families, and it is planned that
the network will meet quarterly to facilitate improved collaborative working between
partners providing support for families.
To support the Practitioner Network, the Padlet app has been used to develop to
allow members of the network to share resources and information about training
opportunities.
3 As part of wider collaboration with Child Poverty colleagues and Perth Citizens
Advice Bureau (CAB), the Fast Online Referral and Tracking (FORT) system (a
referral management system) has been developed to facilitate transfer of referrals
between partners to provide a more holistic support to families.  Perth CAB is
coordinating the FORT system, with over 40 partners already involved.  PKC
Services started to be added to the FORT system in December 2024.  Whilst the
focus is currently on the provision of financial and welfare support, we are looking to
expand this to include a wider range of support partners including health, wellbeing,
and employability.
Page 136 of 200

Page 137

Appendix 14 The new universal family support service (delivered by Aberlour Children’s Charity)
started receiving referrals for support at the beginning of September 2024.  The
Family Advice and Community Connections Service (FACCS) has been
commissioned to screen, signpost and/or provide a flexible range of supports to
families requesting early help across Perth & Kinross.
5 As part of the establishment of FACCS, Family Support and Community Workers
have undertaken extensive engagement and awareness raising across the whole of
Perth & Kinross.  They have attended community events, school activities (including
Parent’s Evenings and Parent Council meetings), mother and toddler groups, and
various third sector and community groups.  Further launch activities are currently
being planned.
6 The Families Empowering Communities (FEC) team have continued their expansion
into Muirton, Bertha Park and Blairgowrie (in addition to existing provision in Letham
and Crieff).  A programme of activities in the Easter and Summer 2024 holidays
engaged with 87 families (261 children) across the 5 supported areas.  In each case,
approximately 60% of families had not previously engaged with FEC activities. The
team coordinate community groups which provide various activities for local people
including games nights, family play sessions and parent/community drop-in sessions.
One to one support is also available for parents.  The team received 21 referrals for
one-to-one support in the first quarter of 2024-25, with the focus of work being
around parenting skills and supporting parents with their health and wellbeing.
7 The FEC team have used the Place Standard Tool to engage with children in three
PKC primary schools (as part of ongoing engagement with children in the 5
supported areas).  This tool provides a simple framework to structure conversations
about place and prompts discussion about both the physical and social aspects of
the area in which the children live.  Over 200 children from Rattray, Newhill and
Riverside primary schools shared their views on what they felt about the space in
which they lived.  Although there was variation between areas, a key theme arising
from these conversations was the children’s views around not feeling safe within
their school/community, with comments including concerns about traffic, vandalism
and litter, and community safety.  The children’s recommendations were shared with
a range of relevant partners and will inform the ongoing work of FEC in each
community.
8 The Parenting and Family Learning Team (PFLT) have delivered a range of
programmes that are part-funded through the Whole Family Wellbeing programme,
including Fearless Triple P (supporting parents whose children have anxiety), Teen
Triple P (helping parents’ confidence in dealing with challenging teenage behaviour),
Incredible Years programmes (strengthening parent-child interactions and
attachment), and ante-natal PEEP (supporting parents to bond with their child).
During the period April to September 2024, approximately 60 parents have attended
these programmes (which vary in length) for support with a range of parenting skills.
Feedback from parents has been very positive, with many commenting that they felt
they understood their child better, were more able to manage challenging family
issues, and felt that they had developed better relationships within their families.  The
PFLT team also signposts parents to other service providers as appropriate, and
many parents progress between PFLT programmes as their child gets older, with the
team providing longer-term support where needed.
9 Since January 2024, the PKC COPE Team (who work with children on the edge of
care) have been supported by the WFWB programme to increase their capacity to
support families at different times across the day. Since this time, the number of
referrals received by the team have doubled from approximately 15 families to 30
families per quarter.
10 The WFWB programme is supporting the Supporting People Addressing Needs
(SPAN) programme which is being developed in collaboration with PKC Child
Page 137 of 200

Page 138

Appendix 1Poverty colleagues and Perth CAB.  The programme aims to support increased
partnership between PKC and the third sector and brings together a range of existing
projects supporting families with their finances.  A key focus is on reducing the
stigma around talking about money.  The programme includes training for front-line
workers in being able to engage with families sensitively about money,
understanding the wider needs of families, providing improved referral pathways and
increased awareness of the range of support available for families. 
Page 138 of 200

Page 139

Appendix 1Project Name
Working Smarter
Project Description
The Working Smarter programme has a number of different projects all related to the
strategic and integrated approach of people, technology and crucially, property – looking
to improve how we integrate all three for the best outcomes in relation to facilitating better
productivity, embracing technology, more effectively using our estate and buildings and
enhancing employees experience through flexible operating models.
Project governance structure
Executive Sponsor Clare Mailer
Senior Responsible Owner (SRO) Stephen Crawford
Project Manager Kirsty Fleming
Current Project Timeline
 Project start date 01/04/2021
 Planned project completion date 21/12/2027
Current status of the Project
The Working Smarter project is currently at a key stage in its development. Council on 4
September 2024 approved the purchase of Pullar House and the Kinnoull Street Multi
Storey Car Park:
 Purchase negotiations are currently ongoing and progressing as anticipated
 Positive discussions are ongoing with prospective Partners to collate with PKC
within Pullar House
 Three existing tenants expected to renew leases on cost-sharing basis and
7 prospective tenants, 2,400m² likely to be let (35.6% of Pullar House) and
all are a high likelihood of finalising terms.
 Space planning exercise (phase 2) is currently ongoing to maximise the utilisation
of available office space for both Council staff and partner organisations
o Associated reconfiguration and relocation of staff within Pullar House and 2
-26 High Street is currently underway, with moves scheduled between May
and September 2025
o Technical design being finalised for Justice Services relocation from St
Martin’s House to 2nd floor of Pullar House (construction scheduled to begin
September 2025)
o Design phase reaching completion and construction scheduled at
Inveralmond Depot for collocation of Traffic & Network Team (May / June
2025)
 Parking Services, supported by Property Services, are appointing an external
Project Manager to progress essential upgrades to the car park
Page 139 of 200

Page 140

Appendix 1Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
1 Improved collaboration, at all levels, and between Council staff and our other
stakeholders.
2 Utilising technology and new working styles to facilitate better productivity.
3 Enhanced employee experience and work/life balance through our more flexible
operating model – we anticipate an additional benefit from this in the areas of staff
recruitment and retention.
4 More effective use of our property estate, allowing more collaborative working and
reducing our carbon footprint.
5 An established model which will provide for the more effective, efficient and
sustainable delivery of services to our communities.
Outputs delivered since update
1 Council approval to purchase Pullar House and Kinnoull Street multi-storey car park
2 Board and service approval to relocate Justice Services to within Pullar House and
Traffic & Network Team to Inveralmond Depot
3 Pre-purchase collocation of NHS Vaccination Services within Pullar House
4 Space Planning phase 1 completed with feedback received from all Strategic Leads
to inform final phase
Page 140 of 200

Page 141

Appendix 1Project Name
Zero Waste & Operations
Project Description
This programme involves a review of waste strategy and waste management
arrangements to deliver national initiatives, improved outcomes and realise best value and
service efficiencies. It has a number of workstreams including: commercialisation review;
operational asset review; circular economy strategy and service design beyond twin
stream; schools recycling improvement, fleet transformation. Alongside this, the
programme also includes a review of the delivery of our operations to ensure we are
maximising opportunities for efficiency and effectiveness.
Project governance structure
Executive Sponsor Clare Mailer
Senior Responsible Owner (SRO) Fraser Crofts
Project Manager Pete Leonard
Current Project Timeline
 Project start date 01/12/2024
 Planned project completion date 31/12/2027
Current status of the Project
This project is still in its early stages, overall it is progressing well with a number of
different workstreams engaged in initial factfinding and discovery work. A formal
governance structure has been established with the project being reviewed monthly and,
the programme is flagged as ‘green’, meaning that it is being delivered largely to
schedule. The programme is reviewed monthly by the Strategic subject to scrutiny by the
Transformation and Change Board on a six-weekly basis.
Page 141 of 200

Page 142

Appendix 1Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
1 Clarity on resource requirements and operating model for all activities currently
being undertaken by the Operations Team
2 Commercialisation review will present service delivery options and identify the
optimum target operating model.
3 Operational property/depot asset review will establish investment requirements to
support a sustainable (money and carbon) operational asset base over the next 30
years, aligned with the approach set out in the Council’s approved Property Asset
Management Strategy
4 Circular economy strategy will inform the future transformation of the Council’s
waste and recycling operations and associated infrastructure and/or major
contracts expenditure together with sustainable economic development activity with
local businesses
5 Fleet transformation will build on the existing Fleet Asset Strategy to identify
investment requirements to support the decarbonisation of the Council fleet. It will
also seek to maximise the efficient use of the fleet/grey fleet. There is a
dependency on other work to extend and improve EV charging infrastructure
6 Schools recycling improvement project will reduce carbon emissions and save
money and present STEM and citizenship opportunities for learners.
7 Further development of the technology system will improve business insights and
customer service
Outputs delivered since last update
1 This project is still in its early stages, overall, it is progressing well with a number of
different workstreams engaged in initial factfinding and discovery work. A formal
governance structure has been established with the project being reviewed monthly
and, the programme is flagged as ‘green’, meaning that it is being delivered largely to
schedule. The programme is reviewed monthly by the Strategic subject to scrutiny by
the Transformation and Change Board on a six-weekly basis.
A scope has been agreed for external consultants to carry out a review of Operations
resourcing, which will include a benchmarking exercise, and it is hoped that a contract
award can be made soon. Meantime progress is being made on reducing levels of
overtime and agency usage.
2 Initial project planning for the commercial waste review is complete and a number of
tasks are complete/underway. Three potential sources of additional income have
been identified:
 Increase the number of commercial customers that can be serviced from
domestic routes that have available capacity
 Expand the Front-End Loader (FEL) business
 Expand the skip hire business.
A business model canvas has been developed to inform the service design and
delivery model, and a draft marketing plan has been developed.
3 The Operational Property/Depot review is at an advanced stage, and we expect to
receive the draft options appraisal report on schedule.
4 A dedicated officer is coordinating the Circular Economy strategy development, which
requires input from various teams across the Council. A project plan is in place and a
report and draft strategy will go to the 20 August CC&S Committee, seeking
Page 142 of 200

Page 143

Appendix 1permission to move to public consultation on the draft strategy.  The same Committee
will also receive a final update on the existing Waste Management Plan.
5 A report will go to the 30 April CC&S Committee setting out a medium-term fleet
decarbonisation strategy. This will include a recommendation to roll out the use of
Hydrogenated Vegetable Oil (HVO) fuel to the remainder of the heavy fleet. This
follows a successful trial with several waste vehicles. The report also sets out plans to
extend the Council’s electric pool vehicle fleet and to develop charging point
infrastructure to support this.
6 A detailed project plan is in place for Schools Recycling Improvement together with a
dedicated project officer. A project coordination group has been put in place, which
includes representatives from education and facilities management. The improvement
plan is being rolled out on a phased basis, with Bertha Park and its associated
primary schools being the first phase. There is a high level of engagement from pupils
and teachers.
7 Utilising the opportunities of digital technology is at an early stage of development. A
high-level project plan is in place. There are interdependencies with other
transformation projects in the digital and customer service space and joint meetings
with other project leads are taking place
Page 143 of 200

Page 144

Page 144 of 200

Page 145

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality
___________________________________________________________________
Committee or Board: Perth and Kinross Council 
Date of Meeting: 7 May 2025 
Report Title: Short Term Let Control Area 
Report Number: 25/114
Report Author: Kevin Divin, Team Leader - Housing Strategy
Organisational Lead: Serge Merone, Strategic Lead - Economy,
Development and Planning
___________________________________________________________________
1. Purpose 
1.1 This report seeks approval to commence the formal statutory process to
introduce a Short Term Let (STL) Control Area for Highland Perthshire and
northern part of the Eastern housing market areas.
1.2 This report is structured over the following sections:
1. Purpose
2. Recommendations
3. Background/Context
4. Proposals
5. Statutory Process 
6. Conclusion
7. Impact Value Assessment
8. Appendices
2. Recommendations 
It is recommended that the Council: 
2.1 Agree to proceed with the notice of a proposal for the designation of a Short
Term Let Control Area for Highland Perthshire and northern part of the
Eastern housing market areas.
9
Page 145 of 200

Page 146

3. Background
3.1 The Scottish Government and local authorities have recognised the need to
manage the number of commercial STLs to protect both the supply of homes
to meet local housing need (including key workers) and the amenity of
residential areas. STL Control Area legislation was introduced in April 2021,
permitting local authorities, as the planning authority, to establish Control
Areas. Within Control Areas, planning permission is required for the change of
use of dwellinghouses to STL ‘to allow consideration of impacts on the
availability of residential housing’.
3.2 For clarification, planning permission has always been required to change the
use of a residential flat to a STL. Since the introduction of this legislation, two
such Control Areas have been established in Scotland: across the entire City
of Edinburgh Council area (Sept 2022) and the Badenoch & Strathspey ward
of the Highland Council area (March 2024). 
3.3 The Local Housing Strategy (2022-2027) identified a reduced housing supply
and affordability concerns of communities, particularly in rural areas, resulting
in an action to consider the feasibility of a Control Area (Action 1.7.LHS_2022-
27_Action_Plan.pdf (pkc.gov.uk) along with other actions.
3.4 The Environment, Infrastructure & Economic Development Committee of 31
May 2023 Short Term Let Control Area: Proposals for Consultation - Report
No. 23/171 refers) approved the undertaking of public consultation on the
principle and agreed the potential boundary of a STL Control Area, with an
instruction to officers to report on the results and to provide additional analysis
based on applications for STL licences. The consultation was completed in
August 2023; however, the Scottish Government extended the deadline for
submission of licence applications by existing operators to 30 September
2023, resulting in a delay in completion of the analysis to late spring 2024.
The consultation exercise in 2023 received 333 responses from residents
(224), business owners (95), and various organisations, both community and
trade (14). Of the respondents, 53% agreed with the proposal to designate an
STL Control Area with 41% disagreeing and 6% having no strong opinion
either way. In general, responses from within the proposed Control Area were
more strongly in favour of the principle, at 76% of residents and 57% of
organisations.  However, businesses were generally not supportive with 69%
against the principle. Further detail is included in appendix 2.
3.5 A Non-statutory planning guidance: Change of Use of Residential Property to
Short-term Let was approved by the Environment, Infrastructure & Economic
Development Committee on 1 November 2023 (Report No 23/289 refers) to
inform planning considerations for change of use of residential dwellings to
short-term lets across the entire Council area. 
Page 146 of 200

Page 147

3.6 The Economy and Infrastructure Committee on 28 August 2024 (Report ref:
24/235) noted the contents of the report and rejected the recommendations to
proceed with the designation of a SLT Control Area for Highland Perthshire
and northern part of the Eastern housing market areas. Officers were asked to
reconsider the planning considerations.
3.7 Since the public consultation and analysis, the number of STL licences has
grown. By 19th February 2025, the STL Licence scheme had granted a total of
1699 licences for STLs. The majority (49%) are in Highland Housing Market
Area (HMA), 18% are in Greater Perth HMA, 15% in both Eastern and
Strathearn and 3% in Kinross HMAs.
A distribution map is included in the Evidence Paper attached as appendix 1.
The distribution has remained very similar to when the map was created at
the close of the licence registry to existing STLs, but the detail is highlighted in
tables 1 and 2 below.
Table 1: Distribution of secondary STLs across Housing Market Areas at 19th February
2025.
3.8 Existing STLs had to apply for licence registration by 30 September 2023.
Since then, the growth in the number of new licences has been significant at
32% across all areas. The table below outlines the growth rates across
Housing Market Areas. The most growth has been in Eastern HMA at 44%.
Table 2: Growth rate of secondary STLs across Housing Market Areas at Oct 2023-
Feb 2025. 
3.9 The STL sector growth indicates that the demand in the tourism sector is
recovering (Appendix 1) and that the STL sector has a role to play. The
Association of Scotland’s Self-Caterers commissioned Biggar Economics to
assess the economic impact generated by STLs across Scotland. The
analysis published in December 2024 builds on the consultancy’s previous
work on the impact of the STL sector on Edinburgh’s economy. Based on this
analysis, it is estimated that the economic impact generated by the STL sector
in Perth and Kinross is £51.8m GVA and 1,757 jobs in 2023. 
Page 147 of 200

Page 148

3.10 The number of planning applications that have been received by the council to
18 March 2025 from wards in the proposed control area totals 153. It is the
equivalent of less than 38 per year since the monitoring of STL applications
which started in 2021 (table 3). The number of permissions being sought is
clearly well below the number of licences for STLs, indicating that there is a
number of the STLs that do not require planning permission under the current
system.
Table 3: Numbers of planning applications relating to STLs since 2021- March 2025 by
Ward.
4. Proposals
4.1 Currently, planning permission is only required for the use of a property as an
STL if a material change of use occurs. A change from a flat to a STL is
always considered to be a material change of use requiring planning
permission. For dwellinghouses, the significance of the change must be
considered, but planning permission is not required in many instances. When
a change of use from dwellinghouse to STL is proposed, it is first necessary to
assess whether or not residential amenity will be protected. Consideration
must be given to any change to local amenity, the impact on the character of a
neighbourhood or area, considerations on public and private safety and the
impact on immediate neighbours. The following elements that would be
associated with a STL would have to be taken account of to verify the impact
on residential amenity:-
(a) Guest arrivals and departures procedures;
(b) Particular impacts on other residents in flatted buildings;
(c) Likely frequency and intensity of noise or otherwise unsociable
behaviour;
(d) Impact on public services and residents' amenity;
(e) Cumulative impact on the character and amenity of a neighbourhood;
(f) Number of people the property can accommodate.
4.2 The designation of an STL Control Area would clarify the planning status of
dwellinghouses used for secondary letting. This is defined as being where the
owner/host does not reside at the property and thus allow appropriate
regulatory oversight to balance the needs and concerns of the community as
well as the potential impact on established residential amenity. If introduced,
dwellinghouses within the Control Area would always require planning
permission in order to operate as STLs. 
Page 148 of 200

Page 149

Once a planning application is submitted, the planning authority would assess
the potential cumulative impact of the STL on the residential amenity and
character of the local area, using the following key considerations: 
1. Where is the proposal located? Is it:
a. Within the city centre or a town centre (as identified in the LDP)
where there would be no adverse impact on amenity or character of
the area?
b. Within an identified settlement (as identified in the LDP) and
located in an area where there is a mix of other uses which could
already affect residential amenity?
c. Within a predominantly residential area and there could be adverse
impact on amenity for existing residents, particularly in blocks with
shared / communal entry?
2. Does the proposal relate to a residential property with four or more
bedrooms, and will there be no adverse impact on local amenity from
noise or disturbance if the let is occupied by a group or more than one
family?
3. Is the proposal for the extensive refurbishment a long-term empty    
property?
4. Will there be no unacceptable impact from the proposal on local amenity
or the character of the area? 
5. Is the proposal part of a diversification scheme to support an existing
Perth & Kinross rural business in line with NPF4 Policy 29: Rural
Development and Local Development Plan Policy 8: Rural Business and
Diversification? 
6. Is there anything which demonstrates that the loss of the residential
accommodation will be outweighed by the benefits of the proposal to the
local economy?
4.3 It must be noted that the Control Area requirements would not be
retrospective, therefore would not apply where the change of use to STL
occurred prior to the Control Area coming into effect. For those changes of
use occurring before the Control Area comes into force, the current position
set out in 4.1 applies. If a dwellinghouse has been used for STL in a continual
manner for more than 10 years, with no planning permission having expressly
been granted, it may be appropriate for the owner to seek a Certificate of
Lawfulness of Existing Use or Development in order to continue operating it
as such.
4.4 The use of buildings such as huts, caravans, agricultural buildings, bothies or
ancillary residential annexes as STLs would not be affected by the
establishment of a Control Area.
Page 149 of 200

Page 150

These changes of use require planning permission under current planning
legislation regardless of a Control Area designation, as do the erection of
buildings specifically for STL or holiday lets.  In both instances, there would
still also be a need for an appropriate STL licence. 
4.5 The proposed STL Control Area would: 
 Allow the Council as planning authority to consider the best use of
residential properties in defined areas of higher concentrations of STLs
in areas of higher housing pressure, along with other relevant planning
matters such as character and amenity.
 Assist the Council in managing sustainable tourism development by
aligning the planning requirements for STLs with other forms of tourism
accommodation. 
 Clarify to the tourism industry the assessment to be used for proposals
of new STLs. 
 Create clarity around when planning permission is required for a change
of use by requiring it in all circumstances 
 Create parity across all forms of secondary STLs (currently only flatted
dwellings, are explicitly required to gain planning permission).
 Control any potential displacement impacts from the adjacent Badenoch
and Strathspey STL Control Area in the Highland Council area. 
4.6 In the table below, the outcomes of the STL Control Area if implemented on
properties of different status are listed:
Property Status STL Control Area Impact
Use of flat as STL No change as planning permission is
already required to do this
Use of non-residential buildings (e.g.
agricultural or commercial building) as
STL
No change as planning permission is
already required to do this
Proposal for new build holiday
accommodation including huts,
caravans, chalets, etc
No change as planning permission is
already required to do this
Use of dwellinghouses as STL licence for
more than 10 years, but no planning
permission in place
No change, the STL Control Area
requirements would not be retrospective
Use of dwellinghouses as STL licence
less than 10 years, but no planning
permission in place
No change, the STL Control Area
requirements would not be retrospective.
The owner could apply for Certificate of
Lawfulness of Existing Use or Development
to regularise the STL use
Use as a dwellinghouse as STL and the
change of use occurs after the STL
Control Area comes into force
Change – this would require planning
permission which will be assessed against
the Development Plan and the criteria set
out in paras 4.1 to 4.4 above
Table 4: Impacts by property status if STL Control Area is implemented.  
Page 150 of 200

Page 151

4.7 For clarification, the designation of an STL Control Area would not negate the
need for a STL Licence.
5. Statutory Process 
5.1 Should Council agree to the recommendation to establish a STL Control Area,
a statutory process is required to be followed. This requires the following
steps to be undertaken: 
1. Publish a public notification of the intention to designate a Control Area,
including a statement of reasons (appendix 3 and with the updated
information from this report) and a map of the proposed Control Area
(appendix 4). A minimum period of 28 days will be given for public
representations to be made.
2. A further report will be brought to Council on the representations
received through the public notification procedure to consider whether
any modifications are required to the proposed STL control area. 
3. With or without modifications, the STL control area would then be
submitted to the Scottish Ministers for approval.
6. Conclusion 
6.1 The proposed STL Control Area will introduce the requirement for planning
permission to be sought for dwellinghouses that are to be used as STLs. By
applying for planning permission, it will allow the Council the opportunity to
consider the impact of residential character and amenity, and loss of
residential accommodation.
6.2 It will ensure uniformity across all forms of secondary STLs as currently only
flatted dwellings, are required to apply for planning permission. The Control
Area will provide certainty on when planning permission is necessary to use a
residential property as a STL.
6.3 It is therefore recommended that the Council proceeds with the notice of a
proposal for the designation of a Short Term Let Control Area for Highland
Perthshire and northern part of the Eastern housing market areas 
7. Impact Value Assessment
https://www.pkc.gov.uk/media/53918/Short-Term-Let-Control-Area-
Proposal/pdf/Short_Term_Let_Control_-
_Area_Proposal.pdf?m=1743950262720
EDMS_Communities Committee - EFIA - STLCA May 2025 Full Council
Report.pdf - Open Content
Page 151 of 200

Page 152

8. Appendices 
8.1 Appendix 1 – Short-term Lets Evidence Paper
8.2 Appendix 2 – Consultation Results 
8.3 Appendix 3 – Statement of Reasons
8.4 Appendix 4 – Map of Proposed Control Area 
Page 152 of 200

Page 153

1
Appendix 1
Evidence Paper-
Short-term Lets
Proposed Control Area
28th August 2025
9
Page 153 of 200

Page 154

2
Executive Summary
 Communities in northern parts of Perth and Kinross have expressed concern about the supply and affordability of housing
 Local businesses and key services have also reported a negative impact on staff retention and turnover due to housing
shortage issues
 Housing Market Pressure research identified STLs as a contributor to Housing Pressure with the greatest impact in northern
and eastern parts of Perth and Kinross.
 There is limited land available to build more housing to address residential and demand from commercial STLs, in northern
and eastern parts of Perth and Kinross.
 In February 2025, 1699 licences had been granted for secondary STLs. The majority (49%) in Highland (HMA), 18%, in
Greater Perth HMA, 15% in both Eastern and Strathearn and 3% in Kinross. The number of new STLs continues to grow.
 The tourism sector has faced challenges since the Covid-19 pandemic, and is concerned that increasing bureaucracy will have
a damaging impact on the health of the tourism accommodation sector.
 In 2019 visitor numbers and the tourism’s contribution to the economy peaked. Visitor numbers returned to 2019 levels in 2023
however the accommodation sector has not quite returned to the 2019 peak.
 A STL Control Area is proposed to allow the council as planning authority to have consideration for the impact of residential
amenity and resource in line with the non-statutory planning guidance (link?) with respect to all STL Licence applications in
northern parts of Perth and Kinross instead of only flatted dwellings which is current situation.
 The 2023 public consultation on the principle of a STL Control Area, found 53% in favour and 41% not in favour.
 A STL Control Area would not affect existing STLs as it would not be applied retrospectively. It would also not impact on flats
which already have to apply for planning permission.
Page 154 of 200

Page 155

3
1.Purpose
The purpose of this report is to update and present the evidence base to the Council of the need for a Short Term Let (STL)
Control Area in northern parts of Perth and Kinross. The area is mapped in appendix 4 of the STL Control Area report to the
Council on the 7th May. This evidence will inform the statutory process including the ‘Statement of Reasons’ to be submitted
for approval to Scottish ministers should the recommendation for the establishment of a Control Area be accepted.
Planning policy allows for consideration of the impact of the Change of Use of residential homes to Short Term Lets under
NPF4 Tourism Policy
NPF4 Tourism Policy 30 e):
“Development proposals for the reuse of existing buildings for short term holiday letting will not be supported where the
proposal will result in: 
i) An unacceptable impact on local amenity or the character of a neighbourhood or area; or
ii) The loss of residential accommodation where such loss is not outweighed by demonstrable local economic benefits”
Currently the opportunity to consider this policy by way of a planning application, applies in limited circumstances mainly
with regard to flats. A control area would expand the opportunity to relate to all residences changing to a Short Term Let.
This would will enable the planning authority to consider the availability of residential homes and the concentration of STLs
when making planning decisions on properties within the Control Area. This expanded requirement for planning
permission would only apply after a Control Area is designated and would not apply to existing licenced STLs. This would
give the planning authority the ability to control only the future numbers of STLs within the control area.
The purpose of an STL control area is one means by which the Council could support the future balance of tourism
accommodation provision and the housing needs of the local residents, businesses and services in communities where
there is currently an imbalance.
2.Evidence
2.1 Public Engagement
Page 155 of 200

Page 156

4
Engagement during the creation of the Local Housing Strategy highlighted issues with the availability and cost of housing.
71% of respondents to the survey in Highland Housing Market Area (HMA) and 48% in Eastern (Strathmore & the Glens)
HMA, showed concern over supply and affordability of housing, outlined in figure 1 below.
Figure 1:
LHS
Engagement concerns
regarding housing
2022-02-15 PKC LHS Early Engagement Results.pdf
Page 156 of 200

Page 157

5
Similar feedback from other consultation events for several strategies and Community Action Plans have raised the issue
of the availability and affordability of housing.
 Local Development Plan 3 - The Big Place Conversation - Perth & Kinross Council (pkc.gov.uk)
 National Park proposal Tay_Forest_National_Park_-_Consultation_Analysis_Report_Final_for_website.pdf (pkc.gov.uk)
 Community Action Plans:
o PH8_Community_Action_PLan_2022-2027_FULL_DIGITAL.pdf (dunkeldandbirnamnews.co.uk)
o PitlochryCAP-fin_al-document-with-printer-1.pdf (pitlochryaction.org.uk), PitlochryCAP-fin_al-document-
with-printer-1.pdf (pitlochryaction.org.uk)
o Highland___Strathtay_Local_Action_Plan.pdf (pkc.gov.uk).
2.2 Essential Services
Since 2021, there has been several reports to the Council of essential services being temporarily impacted by staffing issues
linked to accommodation shortages, in these instances across Highland Perthshire-
 NHS - temporary closure of Pitlochry Community Hospital Inpatient services
 Reserve fire services in Dunkeld – issue reported to Community Planning Committee of staff shortage
 Education service in Kinloch Rannoch – reported to Housing Services of lack of housing for staff
Although the impacts were not permanent, these could be early warning signs of future longer-term difficulties.
2.3 Business Concerns
Local Housing Needs Assessments conducted in 2021 and 2022 highlighted business challenges resulting from housing
availability for staff, affecting recruitment and retention.  Business responses indicated in figure 2 below, highlights concerns
for both current operations and future business growth, in locations where tourism a key part of the economy.
Page 157 of 200

Page 158

6
Figure 2: Business survey collated from HNAs 2021-2022 
2.4 Housing Pressure Study
A Perth and Kinross wide housing pressure study was conducted in early 2024 as part of the evidence paper accompanying
the Committee Report (ref: 24/235) for the Economy and Infrastructure Committee on 28 August 2024.  The study by housing
research consultants Arneil Johnston assessed the role of various housing market indicators, including short-term lets, and
compared housing pressure across Housing Market Areas and in targeted locations (hotspots) where concentrations of STLs
warranted a deeper analysis.
Page 158 of 200

Page 159

7
Housing Market Areas
A summary of the analysis across Housing Market Areas is given in figure 3 below. It demonstrates that
 The highest pressure of all areas, from all indicators, is in Highland Housing Market Area. 
 STLs have the greatest impact in this market area
 Housing pressure is twice as great in Eastern HMA as in Greater Perth HMA
 There is moderate pressure in Kinross-shire and it is not due to STLs.
 Pressure in Strathearn is more significant but due mainly to affordability reasons with a more moderate impact from
STLs.
Analysis ‘hotspots’
Housing pressure analysis on more targeted areas ‘hotspots’ also outlined in figure 3 below indicates
 High pressure in the northern part of Eastern HMA, scoring high on all indicators, including Short-term Lets.
 Scores on all indicators are low for Perth City hotspot, indicating that concentrations of STLs are too low to contribute to
any housing pressure in Perth City. 
 In relative terms, housing pressure in Comrie and Crieff is moderate
 Comrie and Crieff have relatively few STLs
Page 159 of 200

Page 160

8
Figure 3: Housing Pressure Study Summary 2024
Page 160 of 200

Page 161

9
The Scottish government cites volumes of sales to inward migration as a potential reason to demonstrate the need for an STL
Control Area. The figure 4 below indicates that Highland HMA and north-eastern hotspot has the greatest proportion of sales to
inward migration at 57% and 61% respectively. 
Figure 4: Housing Pressure Study Summary 2024
Page 161 of 200

Page 162

10
3.PKC Interventions
3.1 Interventions
The council conducts several initiatives to support living in communities identified in the above study as areas of housing
pressure, including,
Council Tax second homes supplement
 Legislation was introduced in April 2024 to allow Councils to increase the second homes supplement to 100% to
address second home ownership. Perth & Kinross Council has exercised this option.
Empty Homes
 Empty Homes Initiative to channel funding and efforts to bring suitable empty properties into use
Rural Homes
 Working with Scottish Government and PKC Housing and Property Services, to release funding for homes for
rural key workers
 Working to identify land suitable for affordable housing for short-term and longer-term land supply.
 This land supply will support Council and community led housing development opportunities.
3.2 Limitations
The work outlined above is limited by the availability of land in rural areas and that land being developed for housing.
The map below (figure 5) illustrates in pink the land that is suitable to be developed for housing.
It is clear the supply of suitable land is limited particularly in areas of housing pressure. 
The potential for areas outside Greater Perth to mitigate housing pressure through new build housing is clearly
constrained. 16% of land is in Strathearn, the majority of which is in Crieff at (10%).  Eastern HMA has 13% of suitable land
but none of it is within the north-eastern hotspot area.  Kinross has 9% of suitable land and Highland has just 3% whereas
Greater Perth has 55% of land suitable for housing development.
Page 162 of 200

Page 163

11
Figure 5: Distribution of unconstrained housing land per Housing Market Area
Legend
HLA–
unconstraine
d land
Housing
Market Areas
Page 163 of 200

Page 164

12
Delivery of housing on suitable land is equally challenging. The map, figure 6, below illustrates that suitable land for
housing in Highland Perthshire has not been developed.
Figure 6: map above shows the distribution of the remaining housing land supply where 50+ houses are still to be built
(2023 Housing Land Audit).
Page 164 of 200

Page 165

13
4. Short Term Lets
4.1 STL Licence Data
The map (figure 7) and table (figure 8) below provide the number and distribution of STL lets across the Housing Market
Areas of Perth and Kinross.  By 19th February 2025, the STL Licence scheme (introduced in October 2022) had granted
a total of 1699 licences for secondary lets. The majority (49%) are in Highland Housing Market Area (HMA), 18% in
Greater Perth HMA, 15% in both Eastern and Strathearn and 3% in Kinross HMA.
Figure 8: Distribution of secondary STLs across Housing Market Areas at 19th February 2025
Existing STLs had to apply for licence registration by 30 September 2023. Since then the growth in the number of new
licences has been significant at 32% across all areas. The table below (figure 9) outlines the growth rates across
Housing Market Areas. The most growth has been in Eastern at 44%. Interestingly the growth is less pronounced,
however at 27% it is still significant.
Figure 9: Growth rate of secondary STLs across Housing Market Areas at Oct 2023-Feb 2025
This demonstrates a likely return of tourism health following the recent challenges since the Covid-19 pandemic.
Page 165 of 200

Page 166

14
Figure 7: Map of Short-term Lets (secondary) Licences granted at 19th February 2025
Legen
dSTLs by
Postcod
e
Housing
Market
Areas
Page 166 of 200

Page 167

15
4.2 Tourism
The public consultation in 2023 on the principle of introducing a Control Area, received feedback from tourism
accommodation representatives, generally not in favour of the proposal. The concern was that increasing bureaucracy will
negatively impact a sector that has faced significant challenges since 2019.
With regard for these concerns and the overall importance to the PKC economy, a review of tourism sector statistics was
made and included in figure 10 below. 
The visitor economy has been impacted by recent economic challenges and although has not quite returned to the peak of
2019, recovery appears to be relatively strong in the face of current circumstances. Despite lower levels of visitor numbers
(2.32 million) and stays (397,000 in non-serviced accommodation) than in 2019, the economic value of the sector as a whole
and the value of the non-serviced tourism accommodation* in 2023, at £307million, was higher than 2019 (figure.10).
Employment in the non-serviced accommodation sector has not returned to the 2019 peak with 2260 full time equivalent jobs
in 2023, 21% down on the 2019 peak.
Furthermore, research commissioned by the Association of Scotland’s Self-Caterers defines the contribution of the STL
sector more directly. Biggar Economics assessed the economic impact generated by STLs across Scotland. The analysis
published in December 2024 builds on the consultancy’s previous work on the impact of the STL sector on Edinburgh’s
economy. Based on this analysis, it is estimated that the economic impact generated by the short-term let sector in Perth
and Kinross is £51.8m GVA and 1,757 jobs in 2023.
Introducing a Control Area would not prevent the growth of STLs. By Bringing the requirement for planning permission into
line with other forms of tourism accommodation with regard to the planning system would allow for the needs of the
community to be considered with regard to the economic benefits of STL accommodation, in balance with the need for
housing to support the tourism jobs created and wider benefits.
*Non serviced accommodation - Self-catering, lodges, glamping pods, camping (tent pitches), caravanning (static pitches) 
Page 167 of 200

Page 168

16
Figure 10: Source: PKC STEAM REPORT FOR 2012-2023
Page 168 of 200

Page 169

17
4.3 Planning System
Under the current planning system, there are few opportunities for the council to consider the best use of housing. The table
below indicates the number of applications for all types of STL by wards in the proposed Control Area between 2021 and
2025.
The number of permissions being sought, totalling 153 (figure 11), is clearly well below the number of licences for STLs,
indicating that there is a significant number of the STLs that do not require planning permission under the current system. 
This suggests there are significant number of occasions where the planning authority could consider the balance between
competing needs for housing, but cannot under the current system. A STL Control Area would give the council more scope
for these planning considerations to be made.
Figure 11 : Numbers of planning applications relating to STLs 2021- March 2025 by Ward
5. Proposal
The council can intervene by establishing a STL Control Area. This would bring all Changes of Use of residential buildings
to the notice of the council via a requirement for planning permission. This would allow the planning  authority the
opportunity to consider whether the loss of a house from residential use would outweigh the benefits to the local economy
Page 169 of 200

Page 170

18
of the house becoming an STL. At the moment the council has this opportunity with flats and all other tourism 
accommodation such as hotels, purpose built holiday lodges, yurts etc. A control area would require residential homes to
be considered in the same manner.
As such the introduction of a Control Area would not mean a change to use as an STL would no longer be permitted (in
effect a blanket ban). Each case would be considered individually in context of the local cumulative impact of STLs. Figure
12 below illustrates some scenarios for information. The need for planning would only be applied to new applications and
from the date of designation of a STL Control Area (if approved).
Property Status STL Impact
Use of flat as STL No change as planning permission is already required
to do this
Use of non residential buildings (e.g.
agricultural or commercial
building) as STL
No change as planning permission is already required
to do this
Proposal for new build holiday
accommodation including huts,
caravans, chalets, etc
No change as planning permission is already required
to do this
Existing dwellinghouses with STL licence
for more than 10 years but no
planning permission in place
No change, the STL Control Area requirements would
not be retrospective
Existing dwellinghouses with STL licence
less than 10 years but no planning
permission in place
No change, the STL Control Area requirements would
not be retrospective but the owner could apply
for Certificate of Lawfulness of Existing Use or
Development to regularise the STL use
Use of dwellinghouse as STL Change – this will now require planning permission
Figure 12 : Numbers of planning applications relating to STLs 2021- March 2025 by Ward
Page 170 of 200

Page 171

19
5.2 Consultation Results
An early stage public consultation was undertaken to assess public appetite for a STL Control Area in northern parts of
Perthshire (Highland Housing Market Area and northern half of Eastern Housing Market Area) see map Appendix 4.
The aggregate consultation results in figure 13 below illustrates that most responses were in favour of the principle of an STL
Control Area at 53%, and 41%  not in favour.  When views were broken down by respondent type (figure 14), there was an
almost equal split with 70% of residents agreeing and 73% of business owners disagreeing. Responses on behalf of
organisations were split equally between agree and disagree.
The same pattern of responses was expressed for the proposed location of the STL control area (Highland HMA and the
northern half of Eastern HMA) with 46% supportive and 43% not in favour. 11% were uncommitted either way.
The consultation asked for an indicator of location of the respondent with a postcode area. Over 200 (67%) responses came
from postcode areas within the proposed control area location. Of these, most responses were in favour of the principle at 76%
of residents and 57% of organisations in support.  75% of residents and 80% of the 7 organisations representing the control
area were in favour of the location and were illustrated in the consultation report in appendix 2 of the 28th August Economy and
Infrastructure Committee Report, page 14. Again, business responses from postcode areas within the proposed control area
were not in support, with 69% not in favour of the principle. 
Page 171 of 200

Page 172

20
Figure 13: Consultation responses to principle and location of the proposed STL Control Area
Page 172 of 200

Page 173

21
Figure 14: Consultation responses to principle of the proposed STL Control Area by respondent categories
Organisations included
Community Councils (3)
Community Development Trusts (2)
Trade orgs (5)
Groups of residents (2)
Political Groups (2)
Q . To w hat ex te nt do yo u ag re e w i t h t he pr i nc ipl e o f a s ho r t - te r m l et pl ann in g co nt ro l are a?
Page 173 of 200

Page 174

22
5.3 Summary
The evidence of the growth of STLs, housing demand, and business challenges suggests that the balance of economic benefit
of the visitor accommodation sector and housing need is not in equilibrium. 
The consultation responses also demonstrate the extent to which tourism is a vital part of the economy in some parts of Perth
and Kinross and that a balanced approach is needed to manage the available housing stock more effectively.
Although the consultant's report for the Housing Pressure Study recommended a comprehensive approach, and included a
STL Control Area in locations of both relatively high pressure,  (Highland HMA and the north Eastern ‘hotspot’) and more
moderate pressure (Crieff and Comrie) where the number of STLs play a part, the recommendations set out in the research
report are not fully supported.
Closer examination of the concentrations of STLs (outlined in figure 15 below) in the Comrie postcode area show a lower
percentage of STLs at only 2%. Second homes are a greater contributor to housing pressure in this area at 3%. As such, other
controls such as the Council Tax supplement may be more effective than a STL Control Area in achieving a balance of housing
use. 
In the Crieff area STLs are also not a significant contributor to housing pressure being approximately the same as the Perth
and Kinross average.
In contrast, this is not the case in Highland and north Eastern HMAs.  STLs here are well above average concentrations at 9%
and 13% respectively. This is distinctly higher than in other parts of Perth and Kinross, as illustrated in figure 15 below.
Page 174 of 200

Page 175

23
Figure 15: Concentrations of STLs as % housing stock by study areas
Furthermore, the consultation on the principle and boundary of a control area found that most respondents from Crieff and
Comrie area, whether resident or business, were not supportive of a Control Area, with 40% in favour and 60% against overall.
Page 175 of 200

Page 176

24
6. Conclusion
In areas of high housing pressure there is evidence that this housing pressure is also impacting on local businesses and
services, evidencing the concerns of local communities.
STLs have a contributing (but not sole) factor in housing pressure in Highland HMA and north eastern areas of Eastern HMA.
The Council is working to address other contributors to housing pressure:
 Council Tax second homes supplement
 Empty Homes
 M ore Rural Homes
To supplement this work and investment, and acknowledging the benefits visitor accommodation can bring to local economies,
it is recommended that an STL Control Area would be appropriate in the more limited geographic area of the Highland HMA
and the northern part of the Eastern HMA to help manage the future balance of availability of residential homes and short-term
lets.
Page 176 of 200

Page 177

1
Appendix 2
Short Term Let Control Area - August 2023 Consultation Responses
SHORT-TERM LET DRAFT NON-STATUTORY GUIDANCE
SUMMARY OF CONSULTATION RESPONSES
Acronyms used in this appendix
CLUD Certificate of Lawful Use or Development
CPO Compulsory Purchase Orders
HNA Housing Needs Assessment
LDP Perth & Kinross Local Development Plan
PKC Perth & Kinross Council
P&K Perth & Kinross
NPF National Planning Framework
STL Short-term let
List of tables/charts
Chart 1 – Breakdown of responses by respondent sector
Chart 2–  Breakdown of responses originating from postcode areas within the proposed control area
Chart 3 – All responses to principle of a STL Control Area
Chart 4 – Breakdown of responses to principle of a STL Control Area by respondent sector
Chart 5 – Breakdown of responses to the principle of a STL Control Area by respondent sector from postcode areas within proposal
Chart 6 – All Responses on location of the proposed control area
Chart 7 -  Breakdown of Responses to location of proposed control area by respondent sector
Chart 8 – Breakdown of responses from postcode areas within proposed control area  on location
Chart 9 – Breakdown of responses from specific postcode areas on location of proposal
Table 1 – Breakdown of responses by respondent sector
Table 2 – List of organisation / group respondents
Table 3 – All responses to the principle of a control area
Table 4 – Comments summary on principle
Table 5 – All responses to the location of a proposed control area
Table 6 – Comments summary on location of proposed control area
9
Page 177 of 200

Page 178

2
Page 178 of 200

Page 179

3
Chart 1 Table 1 Table 2
Table 3 Responses originating from postcode areas within the control area
(includes/ representative of that area)
Chart 2
Relation to Control
Area Residents
Business/
Resident
Orgs/
Groups Total %
Postcode area
within proposal
(25 Eastern HMA) 156 69% 63 28% 7 3%
225 67%
Postcode area
out-with proposal
but in PKC 68 67% 30 29% 4 4% 102 31%
Postcode area
Out-with PKC 0 0% 2 33% 4 67% 6 2%
Undeclared 0 0% 0 0% 0 0% 1 0%
Total       334       
67%
14%
15%
4%0% Resident
Resident and
business owner
Business owner
On behalf of
organisation /
group
Not stated
Respondents Resident 224 67%
Resident and
business
owner
46
Business
owner
49
29%
On behalf of
organisation /
group
14 4%
Not stated 1
TOTAL 334
100%
 Aberfeldy Community Council
 Aberfeldy Development Trust
 Airbnb
 Association of Scotland's Self-Caterers
 Conservative Group on PKC
 Federation of Small Businesses
 Glenlyon and Loch Tay Community Council
 Glenshee & Strathardle Tourist Association
 Rannoch Community Trust
 Ristol Consulting Ltd representing estates providing STL
accommodation in Highland Perthshire
 Scottish Conservative Group on PKC
 West Carse Community Council
 Response on behalf of 12 residents
 Response on behalf of 30 residents
67%
31%
2%0%
Responses within
proposed CA
Reponses out within
CA but part of PKC
Responses outside
PKC
Undeclared
Responses from within the Control
Area
Page 179 of 200

Page 180

4
Q. Principle - To what extent do you agree with the principle of a control area?
Response All
Agree /
strongly
agree 178 53%
Disagree /
strongly
disagree 138 41%
Neither agree
nor disagree /
don’t know /
no comment 18 5%
Total 334 100%
Table 3                                                           
Chart 4: Results by respondents
70%
27%
3%
Residents
14%
73%
13%
Business owners
50%
50%
0%
Organisations /
groups
53%41%
5%
Agree / strongly
agree
Disagree / strongly
disagree
Neither agree nor
disagree / don’t know /
no comment
Chart 3 : All Responses
Agree,
18%
Disagree,
69%
Neither,
13%
From Control Area
Resident business
Agree,
57%
Disagree,
43%
Neither,
0%From the Control Area
Organisations
Agree,
76%
Disagree,
22%
Neither,
2%
From the Control Area  Residents
Chart 5 : Results by respondents from postcode areas within proposal
Page 180 of 200

Page 181

5
The responses set out in the tables below are grouped by respondent sector i.e. resident, business owner (including those who are also
residents), or organisation / group.
Table 4 - Q. Principle - To what extent do you agree with the principle of a control area?
RespondentResponse
Residents Business Owners (including those
resident)
Organisations / group
Agree /
strongly
agree
housing costs increasing
beyond local wages
property taken off the market
for use as a business asset,
deprives local residents of a
home
now attractive to absentee
investors of portfolios of
property
government rent controls make
long term letting less profitable
and so less desirable
people unable to live here and
businesses unable to recruit
staff as no where to live
wealthy, retired people are the
only ones able to afford even
the basic house
desirable holiday locations
becoming hollowed out; my
hamlet 2/10 full time occupied-
impacts on school roll, bin
collections and bus service etc.
Housing problems for young
people eg: couple with own
too many holiday houses and second
homes, we counted at least 100 in
Strathardle and Glenshee. Lack of
homes for families and workers
impossible for locals to buy housing, the
village of Dunkeld is suffering
not good for the community not enough
for young people
empty properties for significant parts of
the year - leading issues for year-round
financial stability of businesses in the
area
Local school roll is decreasing due to
lack of affordable family homes
Holiday houses do not pay council tax
therefore contributing nothing to the
local facilities
I do believe that secondary letting
needs to be regulated and requires a
registration scheme. Currently this is an
Glenlyon and Loch Tay Community Council
area has an abundance of short-term let tourist
accommodation including second homes and a
lack of affordable to buy or rent accommodation
Aberfeldy Community Council believe that the
housing crisis is very acute locally, and
addressing this should involve a mixture of
increasing supply, and control measures to
regulate current and future use of suitable
properties. We see this as one of a package of
measures that could usefully be undertaken to
help
Aberfeldy Development Trust support any
mechanisms to enable Councils to manage the
number of second houses/holiday lets, to
protect the local housing supply for long-term
residents; help safeguard our rural communities
for the future. We understand the importance of
providing accommodation for visitors. This
should be balanced with the housing needs of
local communities. We believe that change is
needed, robust and effective legislation will help
safeguard our rural communities for the future.
Surveyed demand for social housing was almost
4 times the level of supply. 45% stated that they
Page 181 of 200

Page 182

6
Table 4 - Q. Principle - To what extent do you agree with the principle of a control area?
RespondentResponse
Residents Business Owners (including those
resident)
Organisations / group
Agree /
strongly
agree
business and reserve fire
fighter having to house share.
can’t afford to downsize locally
Enough good neighbours is
invaluable support for many
people, particularly elderly and
disabled people
availability of housing is a 
barrier employment including in
the hospitality industry
impoverishes localities and
reduces spending in the
peripheral areas of P&K
workforce who wish to live
locally have to commute many
miles daily.
Simply building more
affordable housing is
environmentally unsustainable
Not moving fast enough or
going far enough to reduce the
housing shortage crisis
this proposal doesn’t impact
existing economic activity, in
fact could enhance current
holiday letting activities as the
number of such properties will
grow more slowly.
unregulated market that takes away
from affordable housing and renting in
areas and is also competition for
serviced accommodation providers,
but they don't have the costs and
regulatory burden that this market
faces.
As a local employer, I often have
difficulties finding accommodation for
my staff moving to the area.
Action needs to be taken and this is a
good first step, however should be
expanded to the whole of
PKC/Scotland.
would like to set up a business in the area if
they were able to move into it. Average house
price in Aberfeldy (2021/22) was £344,326
Rannoch Community Trust - there are not
enough houses available for locals, many
houses being used as holiday house, taking
houses out of housing supply; increasing local
house prices has led to a shortage of key
workers in the area, young families, numbers at
the school and a decrease in services
one of a package of measures that could
usefully be undertaken to help housing supply
ideally short-term lets should not be allowed to
operate in towns where there are flats and
houses are built close together.  There is plenty
of provision of hotels in towns. some local
hotels in Perth are struggling to survive
enough holiday homes/more permanent homes
Glenshee & Strathardle Tourist Association self-
catering units in our area have moderate to high
occupancy all year round (50-80%); providing
employment for local residents – housekeepers,
laundry, gardeners, maintenance and trades.
Properties are generally maintained to a higher
standard using the services of local plumbers,
electricians, joiners and builders etc. Guests are
much more likely to use village/farm retail and
Page 182 of 200

Page 183

7
Table 4 - Q. Principle - To what extent do you agree with the principle of a control area?
RespondentResponse
Residents Business Owners (including those
resident)
Organisations / group
need to have workers needs
to be balanced against the
need to have tourists or we
kill our own golden goose.
eateries, year round local attractions/sports
facilities etc. 
Strongly
disagree/
disagree
current legislation requiring
planning for flats for STL can
safeguard suitable housing as
residential if used correctly and
policed
a control area will increase the
number of second homes
council and developers need to
build more affordable housing
the proposal won’t resolve the
issue
Lack of housing needs a multi-
faceted approach
there are laws to protect
tenants, but nothing to protect
landlords, so landlords are
giving up and so there are
fewer rental properties
the area relies of the tourism
economy – has the potential to
remove hundreds of jobs-
disproportionate impact on
women and poorer paid
the area has a large dependency on
tourist economics. 
House availability is driven by other
demands, including the shift from
conventional hotel to self catering as
witnessed by the explosion of the
AirBnB business model; the area is
attractive to retiring professionals with
relatively high city house prices; home-
working was accelerated post covid,
leading to professionals moving into
more rural areas and pushing prices up;
the population is growing fast across the
UK. Given that these demand changes
are UK government policy issues the
thing the Council needs to focus on is
building sufficient capacity to meet
demand
STL control is not the answer to lack of
affordable housing. It is another stealth
tax and admin burden
all will be prevented from holiday letting their
property when they’re not there – the property
will make an average 6 x less economic
contribution to the local community (see below),
some owners won’t sell as don’t want to and
don’t financially have to and so will
become/remain empty second homes, some of
those sold may be suitable for long term living
but many won’t be due to their rustic appeal,
remoteness, market price or size, and so will be
bought as a second home again. Insufficient
data. Demand is for STLs. The STL sector was
worth £3.8bn to Scottish GDP and 65,500
Scottish jobs in 2021, so we need to protect the
ability of local economies to capitalise on the
staycation boom by meeting that demand, of UK
residents to holiday here and increasingly to do
so in short term lets as opposed to other types
of accommodation. We do not believe that
planning approaches to limit the short term let
(STL) sector is the best approach. Better use of
un-used and under-used buildings   If the visitor
demand is for STL accommodation we wonder
about incentivising the development of less
wanted accommodation and other under-used
Page 183 of 200

Page 184

8
Table 4 - Q. Principle - To what extent do you agree with the principle of a control area?
RespondentResponse
Residents Business Owners (including those
resident)
Organisations / group
Strongly
disagree/
disagree
 short-term lets will revert to
second homes; empty for part
of the year
 This proposal will limit ability
to local residents to raise
additional income,
 a total infringement of an
individuals rights
 tourism brings business in to
our dying town, where
everything seems to be
closing due to lack of footfall.
 It should not be up to the
residents of Perth and
Kinross to provide suitable
and affordable homes
 controls will incur increases in
both workload and expenses
both for the local authorities
and landlords, greater
expenses will also be passed
down to tenants both long
and short term
 the council should gather data
from its short term lets
licencing exercise to inform
policy
 monitor progress of the
licensing scheme first
not enough consultation with local
business owners
think trend in house purchases just for
short letting needs moderation, but
control area would damage existing
businesses
tourism is vital for the area
most of the local businesses would not
survive on resident expenditure only
the council has existing powers via the
licensing scheme and planning to
control let property supply
I don't trust the data.   Second
homes/STLs are being lumped together
and Air BNB is a marketing platform and
doesn't give an indication of suitable
properties available for housing needs
many let a spare room to increase
income, often due to lack of work
or un-used buildings such as empty second
homes and empty retail units into homes.
This is an attack on small tourist businesses
with no benefit
I strongly believe that a Planning Control Area
should not be introduced at this time. The
impact of the new Short-term Let Licencing
regulations within northern Perthshire (and
Perth & Kinross as a whole) should firstly be
assessed over a number of years, and if they
are not having the desired impact, then a
Planning Control Area could be reconsidered
amongst other solutions
Fundamentally disagree with this level of state
control over the use of private property. It is up
to the individual to do what they want with their
properties. Rather than state imposing
restrictions and a layer of bureaucracy would
rather see state providing affordable rental
housing
The ASSC - disagrees with the principle of
establishing a short-term let Planning Control
Area, as well as its proposed location, as there
is an insufficient evidence-base to proceed;
Page 184 of 200

Page 185

9
Table 4 - Q. Principle - To what extent do you agree with the principle of a control area?
RespondentResponse
Residents Business Owners (including those
resident)
Organisations / group
Strongly
disagree/
disagree
 tourism is an important
industry and we have seen in
Edinburgh that hotels have
massively increased their
rates when a short term zone
was introduced; this has
reduced UK based tourism
which has built strongly post
pandemic
 the Glenshee area which is
heavily orientated to tourism
which is needed for the local
economy
 this will cause a drop in
affordable accommodation for
tourists during the short peak
season, so damaging the
local tourist industry as a
whole
 individuals should not be
penalised further for either
owning a business or having
a second home
 do something about second
homes
 second homes should pay
double council tax
opportunities nearby (living more
remote area).
 employers need to be addressing their
staffing needs too, not just flinging the
issue back at hard working individuals
 I do not trust PKC to implement it fairly
or reasonably
 the problem is nuanced and needs a
nuanced solution not a blanket control
program which would need to be
based on an arbitrarily decided set of
criteria to determine which areas
would be covered and which would not
 a control area should only be
established where there is accurate,
evidence based data to support the
need
believes that the Council should instead
undertake a comprehensive exercise in
gathering precise and verifiable data, providing
stakeholders with the necessary evidence to
make an informed decision and take forward
this consultation
Argues that the draft planning guidance is not fit
for purpose and will be subject to legal
challenge.
Page 185 of 200

Page 186

10
Table 4 - Q. Principle - To what extent do you agree with the principle of a control area?
RespondentResponse
Residents Business Owners (including those
resident)
Organisations / group
Neither
agree nor
disagree/
Don't
know
 there are some good points to
it and some not so good
effects of it
 tourism matters very much in
Scotland
 controls now on rents, many
properties are for sale/ been
sold so less available for STLs
 the data is not sufficient to
make any meaningful
conclusions
 homes which will become
available for sale will go to the
highest bidder.
 potential that a control area
could have an adverse effect
on tourism.
 engage in real dialogue with self-
caterers and not just those lacking
objectivity on the benefits of year-
round local operators
 unconvinced by the evidence that STL
has a significant detrimental impact on
affordable housing stock. I believe
empty & second homes owned by non-
locals is more relevant to this issue
 while I agree in principle with the aims,
I cannot agree overall as it is unclear
as it affects our small holiday let
business.
 planning permission should be
sufficient to determine if property can
be used as a holiday let or not
 some areas planning control would be
beneficial, however I do not believe it
will result in more availability of rented
or affordable housing.
 any designation should be subjective
to the specific area, not a blanket
 No comments made
Page 186 of 200

Page 187

11
Table 4 - Q. Principle - To what extent do you agree with the principle of a control area?
RespondentResponse
Residents Business Owners (including those
resident)
Organisations / group
approach over an entire local authority
area.
 tourism is a significant income
generator and there is a significant
shortage of quality tourist
accommodation
 stopping short term lets is not the
silver bullet to improving housing stock
availability tackle by providing
affordable housing/community housing
 the idea is reasonable, but depends
how the proposed powers are used
 the self-catering sector supports jobs
and livelihoods in the area
 if it is housing that Council wants to
create/ preserve, then I believe the aim
should be to regulate all areas
 STLs in residential areas seem to have
largely escaped planning
requirements? So far, the focus seems
to be on targeting existing STL
properties for planning in largely
commercial or a mix of commercial/
residential areas only. A good few
property owners who have created and
established lawful business
endeavours in areas where there is
little chance of disturbing residential
Page 187 of 200

Page 188

12
Table 4 - Q. Principle - To what extent do you agree with the principle of a control area?
RespondentResponse
Residents Business Owners (including those
resident)
Organisations / group
neighbours are being refused Planning
Permission. 
 Each application, no matter the
location, should be decided on its
individual merit.
PKC Officer Comments
The principle of introducing a STL Control Area drew support mainly from residents and some residents business owners who were concerned
about housing supply and affordability issues and in turn the sustainability of their communities. The main reasons businesses gave were that
they were not in favour of restrictions on businesses that brings employment to communities, and that the evidence provided did not justify the
proposal and could harm tourism growth and therefore employment opportunities. Organisations/ groups gave the same reasons as above
depending on whether they were a community group or trade representative.
The evidence has now been updated using the STL Licence register data and more thorough research into the housing market to bring about the
most informed decision possible. The proposal seeks to provide the planning authority with the opportunity to assess all future Change of Use
applications to STLs rather than for flatted dwellings which is currently the situation. This would allow the council to balance the needs of the
development of tourism accommodation and housing needs in a more sustainable way within the context of each application using the non-
statutory planning guidance, in place since Nov 2023. The proposal is only to introduce a STL Control Area where housing pressure is greatest
and STLs are a significantly larger contributor to pressure than the majority of Perth and Kinross. That has been evidenced to be in Highland
Housing Market Area and the north parts of Eastern Housing Market Area (north of Bridge of Cally).
Page 188 of 200

Page 189

13
Table 5 Q2. Location of
control area 
Strongly Agree/ Agree
153 46%
Disagree/ Strongly
Disagree
144 43%
Don’t know/ Not stated /
Neither agree nor disagree
37 11%
Totals 334 100%
Q. Location - To what extent do you agree with the location of the proposed control area?
46%
43%
11%
Agree / strongly agree
Disagree / strongly
disagree
Neither agree nor
disagree / don’t know / no
comment
Chart 6 - All Responses on location of the proposed control area
Page 189 of 200

Page 190

14
Chart 7 – Responses to location of proposed control area
Responses originating from postcodes areas within the proposed Control Area 
Q. Location - To what extent do you agree with the location of the proposed control area?
Agree,
75%
Disagree,
19%
Neither,
6%
Control Area
Residents Agree,
26%
Disagree,
64%
Neither,
11%
Control Area  - Resident business
Agree,
80%
Disagree,
20%
Neither,
0%
Control Area
Organisation
Chart 8 : Results by respondents from postcode areas within proposal on location
Page 190 of 200

Page 191

15
Responses originating from Crieff and Comrie areas and Blairgowrie and the Glens. The distribution of responses when broken down further, is
similar to the overall distributions.
Strongly
agree/
agree
 I think this map covers the
areas under the greatest
pressure
 The data provided shows very
well where control is needed
Covers the areas i would expect and that
are most effected
Pitlochry and Mount Blair areas have a
shortage of affordable housing
 The proposed control area has
been carefully aligned with the
parts of the Council area where
there are the higher numbers of
short-term lets/second homes and
which are suffering from the
negative impacts. 
agree,
40%
disagree,
60%
Neither,
0%
Crieff (PH7) & Comrie (PH6)  All responses
agree,
38%
disagree,
63%
Neither,
0%PH10 - All responses
Chart 9 : Results by respondents from specific postcode areas on location
Table 6 - Q. Location - To what extent do you agree with the location of the proposed control area?
RespondentResponse
Residents Business Owners (including those
resident)
Organisations / group
Page 191 of 200

Page 192

16
 There will always be someone
who wants the area extended,
so hard to ever put an area
boundary in the right place.
 All of Highland Perthshire
should be included
 Should it not be even wider to
include Blairgowrie?
 Should also include
logiealmond
I think the Blairgowrie area should be
included.
We live in Perth and strongly
believe that it too should be a
control area -there are plenty of
hotels and guesthouses for people
wishing to visit the city centre.
Q. Location - To what extent do you agree with the location of the proposed control area?
RespondentResponse
Residents Business Owners (including those
resident)
Organisations / group
Page 192 of 200

Page 193

17
Strongly
disagree/
disagree
PH6 Comrie, Perthshire has no
available housing. School roll is
rapidly declining
Should extend to whole of Perth
& Kinross.
Don't  think it goes far enough.
Blairgowrie/ Alyth should be
included. I do not believe any
areas should be included.
I think all short term lets which
are not in the same residence as
the landlord, should require
planning permission to allow
adjacent residents the chance to
raise concerns
We should not be attempting to
disrupt the operations of the free
market
Perth city centre to be included
extra layer of cost and
bureaucracy which will damage
tourism to the area and cost jobs
in what is our largest industry! 
target the landowners who own
huge swathes of our countryside
and manage it for the purposes
of a few wealthy folk who want to
shoot our wildlife?
Leave all of it out.
Again, there appears to be only
hearsay evidence of an issue.
The accurate data will come at
the end of the registration
 Any location that is not a reasonable
commuting distance to centres of
employment should be excluded, as
these locations would not contribute
affordable homes to key workers anyway,
and the restrictions would  only serve to
damage the tourism potential
 Too big an area.  No public transport  or
good wi-fi for people, everyone would
need a car.
 I would be more interested in a map that
is more selective in the targeting of areas
that have no long-term rental property
available, rather than a northern PKC
boundary map that appears to have been
drawn for cartography convenience
 It is too early to determine the areas as
short term let numbers are not yet known
 Private property owners are not
responsible for shortage of long term
rented accommodation
 This should not be a planning issue, if the
STL Order is not suitable / robust /
enforced across the entire area then it
should be amended.
 With the reduction in hotel
accommodation and STL where do
tourist go to stay in Perthshire? Where
will P & K make up the short fall. Adding
another restriction will not increase
housing stock. it will deplete tourism and
only increase prices.
We don’t believe in the principal
regardless of where it is
At this stage there is no proper
justification for the location of the
Control Area. 
Until accurate data from licensing
scheme is available we don’t think
it’s possible to fairly apply the
control let to a specific geographic
area.
It has been brought to our attention
that the statistics for the PH8 area
published by PKC are incorrect.
Can PKC comment on this?
Page 193 of 200

Page 194

18
process and the decision on
which areas are most impacted
by short term lets should have
waited until that evidence was
available
neither
agree or
disagree /
Don't know
The whole of the council area
should be included to avoid
pressure on areas immediately
outside a controlled zone.
Only hamlets should be included.
Perth city centre to be included
Looks OK to me.
 I am unconvinced of its significance in
Pitlochry. Each area’s challenges are
different.
 The short term rental properties appear
to be in very touristy locations which is a
massive positive to adding additional
accommodation to allow more visitors
into these areas and to increase tourism
to Perth and Kinross.
 When not running our short term let, we
also manage a small charitable project
helping vulnerable households.  This
area does have a major problem with
access to affordable, fit for purpose long
term lets.
 Pitlochry, Aberfeldy and simiIar quaint/
historic/ scenic towns. I would request
caution to over-regulate the very popular
Tourism Destinations (towns)
Until accurate data from licensing
scheme is available, we don’t think
it’s possible to fairly apply the
control let to a specific geographic
area.
Inconsistency of fees being charged
and requirements being put in place
within areas of a single Local
Authority is a major concern to FSB
members.
Wherever a boundary is put in
place, there will be issues of one
business being more tightly
controlled than another, creating
unfair trading conditions that are
detrimental to the economy as a
whole.  From the perspective of
FSB members, this is the use of a
sledgehammer to crack a nut.
could lead to a complex and
uncertain regulatory environment in
which to do business.
PKC Officer Comments
Many of the comments went back to the principle of a control area being established in any location. Many who disagreed with the
area, agreed with the principle of a Control Area and believed that the area included should be larger, and include the locations
Strathearn, the area between Dunkeld and Perth city, Blairgowrie. Others suggested the control area should be far more targeted.
Page 194 of 200

Page 195

19
The comment regarding the specific instance of data, was locally incorrectly publish figure that was corrected and correction notice
published at the time. at the time.
The evidence has been updated and the impact of a control area evaluated on the basis of housing pressure and of Short-term Lets.
The proposal is only to introduce a STL Control Area where housing pressure is greatest and STLs concentrations are greater than the
majority of Perth and Kinross. In these areas a Control Area can be justified by having an impact on the balance of housing stock and
tourism accommodation.  The refreshed evidence indicates that this area is Highland Housing Market Area and the north parts of
Eastern Housing Market Area (north of Bridge of Cally) which coincides with the previously proposed area.
Page 195 of 200

Page 196

Page 196 of 200

Page 197

1
Appendix 3
STATEMENT OF REASONS
Introduction
Under the Town and Country Planning (Scotland) Act 1997, Section 26B(1), and in
line with the Town and Country Planning (Short-term Let Control Areas) (Scotland)
Regulations 2021 as amended, and Planning Circular 1/2023: Short-term Lets and
Planning, Perth and Kinross Council intends to designate a Short-term Let Control
Area covering Highland Housing Market Area, and northern parts of Eastern Housing
Market Area to allow full consideration of impacts of the change of use of
dwellinghouses to short-term lets on the availability of residential housing for the
reasons set out below. As a consequence of designation, the impact of a short-term
let on the character and amenity of those areas would be assessed through each
planning application.
Reason for designation
1. To enable consideration of impacts of short-term lets on the availability and
affordability of residential housing within the control area.
 Concerns have been raised by communities on the impact of decreasing
affordability and the role of short-term lets on housing supply and affordability.
Public and stakeholder engagement for the Local Housing Strategy showed
that 71% of respondents in Highland Housing Market Area (HMA) have
concern over sufficiency and affordability of housing and 48% in Eastern
HMA.
 There is evidence of higher levels of housing pressure in Highland HMA and
northern parts of Eastern HMA, with affordability analysis indicating that 85%
of resident households would not afford the average market house price in
Highland HMA and 88% in north Eastern HMA. Concentrations of short-term
lets are higher in these areas than in the rest of Perth and Kinross, with 9% in
Highland HMA and 13% in north Eastern HMA, and although important
economic contributors, the concerns of communities suggests that the
balance of economic and housing needs is not in equilibrium.
 Capacity is limited for new build housing in part due to availability of
unconstrained land, with 3% being available in Highland HMA and none in
north Eastern HMA. Oversight of future use of existing residential stock will
assist the planning authority in assessing the balance of a sustainable tourism
industry and housing need.
 Northern Perthshire is adjacent to the Badenoch and Strathspey STL Control
Area, which was designated in March 2024. There is the potential for demand
from that zone to be displaced into Perth and Kinross, in particular parts that
lie within the Cairngorms National Park. As these adjacent areas are
evidenced to be experiencing housing pressure, it would be beneficial for the
planning authority to be able to assess the concentrations of short-term lets.
9
Page 197 of 200

Page 198

2
Conclusion
Community engagement has raised concerns among business and residents of the
impact of decreasing affordability and supply of homes on the sustainability of local
communities. Housing pressure analysis indicates that in Highland Market Area and,
northern parts of Eastern HMA there is significant housing pressure and short-term
lets have a role in this pressure. It is therefore concluded that the establishment of a
Short-term Let Control Area would provide the Council and the Cairngorms National
Park Authority with the opportunity to consider the impacts on the availability of
residential housing in future applications while also balancing sustainable tourism
development for the benefit rural communities.
A short-term let control area would also:
 provide clarity on the need for planning permission for the change of use of a
dwellinghouse to an STL within the designated area.
 allow the opportunity for the public to comment on the proposed change of
use of a dwellinghouse to an STL within the designated area, through the
planning application process.
Page 198 of 200

Page 199

Appendix 4
Map of proposed Short Term Let Control Area
Legend
Control Area
HMA
boundaries
9
Page 199 of 200

Page 200

Page 200 of 200