Page 1

Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
16 August 2022 
SUPPLEMENTARY PACK 1 
PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE - ON A HYBRID BASIS
BY ATTENDANCE IN THE COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD OR
REMOTELY BY MICROSOFT TEAMS on WEDNESDAY, 17 AUGUST 2022 at 10:30 AM 
I enclose herewith supplementary reports for items 6 and 7 on the Agenda for the above meeting. 
Douglas Hendry
Executive Director 
SUPPLEMENTARY REPORTS 
6. MR PAUL RODGER: DEMOLITION OF DETACHED DWELLINGHOUSE,
ERECTION OF 3 DETACHED DWELLINGHOUSES AND  FORMATION OF
VEHICULAR ACCESS: PEAT KNOWE, BACK ROAD, CLYNDER,
HELENSBURGH (REF: 21/01943/PP) (Pages 3 - 8)  
Report by Head of Development and Economic Growth 
7. KILBOWIE DEVELOPMENT COMPANY LTD: ALTERATIONS TO INCREASE
ROOF PITCH OF DWELLINGHOUSES: 1-7 KILBOWIE SHORE, GALLANACH
ROAD, OBAN (REF: 22/00231/PP) (Pages 9 - 12)  
Report by Head of Development and Economic Growth 
Planning, Protective Services and Licensing Committee 
Councillor John Armour Councillor Jan Brown
Councillor Audrey Forrest Councillor Kieron Green (Chair)
Councillor Amanda Hampsey (Vice-Chair)
Councillor Daniel Hampsey Councillor Graham Hardie
Councillor Fiona Howard Councillor Willie Hume
Councillor Mark Irvine Councillor Andrew Kain
Councillor Paul Donald Kennedy Councillor Liz McCabe
Councillor Luna Martin Councillor Peter Wallace   
Contact: Fiona McCallum                  Tel. No. 01546 604392
Public Document Pack

Page 2

This page is intentionally left blank

Page 3

Argyll and Bute Council
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle
_________________________________________________________________________ 
Reference No:   21/01943/PP
Planning Hierarchy:  Local Application
Applicant:   Mr Paul Rodger
Proposal: Demolition of detached dwellinghouse, erection of 3 detached
dwellinghouses and formation of vehicular access 
Site Address: Peat Knowe, Back Road, Clynder, Helensburgh, Argyll and Bute
G84 0QF
________________________________________________________________________
SUPPLEMENTARY REPORT NO. 2
1.0 INTRODUCTION 
The attention of Members is drawn to the main Report of Handling dated 8th June 2022 that is
currently before them for consideration in respect of the above application and the
Supplementary Report No.1 dated 3rd August 2022, on the main agenda.
At the PPSL meeting on 22nd June, The Council agreed to continue consideration of this
application at their next available meeting in August 2022 and instructed Officers to request
that the Applicant provide by the end of July 2022, an engineering report on the ground
engineering works required to ensure stability of the sloping ground to prevent any slippage
or flooding onto neighbouring properties. 
At the time of the preparation of the Supplementary Report no.1 the requested Civil
Engineering Report had not been received, nor had the agent contacted Officers to an agree
an extended timescale for preparation and submission of the Report. As advised within that
Supplementary Report no.1, Officers contacted the agent requesting an up-date to Members
by means of a Supplementary Report. The agent has since provided up-dates on progress
summarised below.
In addition, further representations have been submitted in relation to the proposed
development subsequent to the June meeting of the PPSL and the preparation of the
Supplementary Report no.1 to the August meeting.
The purpose of the Supplementary Report is to up-date Members with regard to the following:
-
1) The applicants progress and intended deadlines for the submission of a Civil
Engineering Report pursuant to consideration of this item by members at the June
PPSL meeting; and, 
2) Further representations received subsequent to the June PPSL meeting. 
Page 3 Agenda Item 6

Page 4

2.0 SUMMARY OF DEVELOPMENTS 
Up-date by the planning agent with regard to the requested Civil Engineering Report
08.08.2022 – The agent confirmed that his client has instructed an engineer to prepare and
submit the further information requested by the PPSL Committee, however he
advised that a full site investigation is required to confirm the stability of the
ground, and that due to the scale of this work the final report wasn't quite
ready. He confirmed that a desktop study and a soil investigation study has
been carried out by Cowal Design. The Report in respect of these interim
investigations is awaited.
The agent has assured Officers that the preparation of the Civil Engineering
Report (to address the issues raised by the PPSL Committee at the June
meeting) is being progressed as quickly as possible and will be submitted
before the deadline of 26/8/22 at the latest (in order to allow the proposed
development to be fully considered by Members at the September PPSL
Committee.)
12.08.2022: - Pursuant to the above, the agent advised that the applicant is still awaiting the
full soil investigation report from his civil/structural engineering consultant,
Cowal Design, but in the interim has provided an email from his structural
engineer with regard to the stability of the site. This e-mail is reproduced in
full below: -
“In relation to the above site we can confirm that we have
reviewed the proposals, the site topographical survey and have
recently had ground investigation works carried out on the site to
establish the underlying ground conditions and confirm that on
the basis of these conditions with sandy clay across the site
overlying shallow bedrock the site is stable and suitable for the
proposals. 
We will update when the Ground Investigation Report is
received, and when the Civil Engineers have designed the
proposed retaining wall layout”.
Further representations received
The main report to PPSL Committee at the June meeting advised that a total of 20 no.
representations had been received, ‘broken down’ as follows: -
Support     1
Objections  17
Representation   2
Since the June meeting of the PPSL, a further representation has been submitted by a Local
Member, Cllr. Mark Irvine, on behalf of local residents who have raised further issues of
concern. These issues are summarised below: -
11.07.2022  Cllr Mark Irvine – 
 Sightlines
Page 4

Page 5

It is submitted that the applicant has carried out site clearance
works and modifications to the site (including cutting back a hedge
on adjoin land without permission), as well as seeking to purchase
adjacent land, prior to submission of the application in order to try
to meet Roads Authority guidelines in relation to access design
and sightlines for an access to serve 3 no. dwellinghouses.
Comment: - The consultation response by the Roads Authority
advises that there are no highways objections to the proposed
development subject to a suspensive planning condition requiring
formation of the access with the required visibility splays.
However, planning officers will investigate whether the land
required for the visibility splays are within the applicant’s
ownership/control, or if not whether there is an agreement that
would allow for the visibility splays to be provided and maintained
where they overlap land not owned by the applicant. Officers will
clarify this issue when the application is reported to the PPSL
Committee following receipt and consideration of the Civil
Engineering report. 
Boundaries
 Concerns have been expressed that the site boundaries have
been ‘stretched’ by the felling of trees that were not within the
property boundaries.
Comment:- The planning authority does not have a remit to
arbitrate on land ownership disputes, however, it does have a duty
to ensure that the application submission is competent in relation
to the Town and Country Planning (Scotland) Act 1997 – section
35, and he Town and Country Planning (Development
Management Procedure) (Scotland) Regulations 2013 – Reg. 15
in relation to the land ownership certification submitted as part of
the application forms. On the basis of legislative/regulatory
procedure only, planning officers undertake to request
confirmation of the certification on the application forms that no
person, other than the applicant, was an owner of any part of the
application site (edged red) at the period 21 days prior to the
submission of the application. The response will be reported back
to the PPSL at the first opportunity. 
 Drainage
It is implied that the small watercourse that forms the southern
boundary of the application site (as shown on the application
drawings) has been damaged and become blocked as a result of
the applicant’s activities. It is suggested that any permission that
the planning authority is minded to approve be subject to a
planning condition requiring restoration/repair of this watercourse
and connected to an adequate drain to avoid potential flooding to
neighbouring properties.
Comment: - The Main Report recommends that planning
permission be subject to a suspensive planning condition requiring
submission and approval of full details of a surface water drainage
system (compliant with the principles of SuDS and the CIRIA’s
Page 5

Page 6

Manual) prior to commencement of any further works on site. It is
expected that such details shall identify any existing blockages of
the watercourse and propose remedial works, and any other
measures required to demonstrate that the proposed drainage
system has adequate capacity to accommodate additional surface
water run-off without resulting in flooding elsewhere. 
Public Access/Footpath
 A submitted extract from Scotland’s Land Information Service (LIS)
suggests that there is a strip of land/footpath that is not within the
property ownership. It is further submitted by local residents that a
cast iron kissing gate has been removed from a position adjacent
to the burn as part of the site clearance, and that this suggests
that there had been some kind of pedestrian footpath along the
strip of land between the burn and the hedge (cleared) that
demarcated the southern boundary of “Peat Knowe”, that at one
time led up to “Cromrach”.
Comment: - The consultation response from ‘Scotways’ advises
that right of way SD13, as recorded in the National Catalogue of
Rights of Way (CROW), crosses or is close to the application site.
As set out in the main report to the June meeting of the PPSL
Committee, it is considered that any potential impact on the
recorded Right of Way SD13 can be satisfactorily mitigated by
planning condition.
The route of the potential footpath along the southern edge of the
site (subject of this representation) is not recorded on the ‘CROW
Map’.
‘Scotways’ additionally point out that there may also be
“Unrecorded Rights of Way” subject to meeting specified criteria;
or subject to “General Rights of Access” created by the Land
Reform (Scotland) Act 2003. Planning Officers will investigate this
issue in discussion with the Council’s Access Manager and advise
Members further at the next available meeting. 
Tree Preservation Orders and Tree Felling
 It is submitted that a local resident made a request to the planning
authority regarding a Tree Preservation Order (TPO) at this site on
July 26th 2021. Now that the trees have been felled there is no
evidence left to prove or disprove that any of the trees would have
been subject to a TPO.
Comment: - It is confirmed that the trees felled on/or adjacent to
the site were not subject to a Tree Preservation Order. 
Traffic and Access
 It is submitted that the local public/private road network is
unsuitable to accommodate the type of HGV construction traffic
required without causing major disruption and damage. It is
suggested that any permission that the planning authority is
minded to approve be subject to a planning condition requiring on-
site provision for unloading of parked construction vehicles and
on-site storage of materials.
Page 6

Page 7

Comment: - The consultation response from the Roads Authority
indicates that the local public road network has been considered to
have capacity in principle to accommodate any additional traffic
movements generated by the propose development, and that
notwithstanding the width, horizontal alignment, gradients and lack
of footways, that the standard of the access regime is not an over-
riding constraint to the proposal in relation to the nature of traffic
movements generated during the construction phase. However,
any planning permission that is approved may be subject to a
planning condition requiring the submission and approval of an
Access Management Plan for consideration by the planning
authority in consultation with the Roads Authority prior to the
commencement of any further works on site. Any such condition
will form part of a later report to PPSL. 
3.0 RECOMMENDATION 
It is recommended that consideration of this planning application be continued to the
September PPSL Committee to allow the applicant the extended opportunity to prepare and
submit the Civil Engineering Report requested.
Planning officers undertake to carry out any further investigations required in response to
concerns expressed by local residents and to report back to the next available PPSL
Committee. 
Author of Report: Norman Shewan      Date: 15th August 2022
Reviewing Officer: Howard Young             Date: 16th August 2022 
Fergus Murray 
Head of Development and Economic Growth 
Page 7

Page 8

This page is intentionally left blank

Page 9

Argyll and Bute Council
Development & Economic Growth   
Delegated Planning Application Report and Report of Handling as required by
Schedule 2 of the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013 relative to applications for Planning Permission or
Planning Permission in Principle 
Reference No: 22/00231/PP
Planning Hierarchy: Local Development 
Applicant: Kilbowie Development Company Ltd 
Proposal: Alterations to Increase Roof Pitch of Dwellinghouses 
Site Address:  1-7 Kilbowie Shore, Gallanach Road, Oban 
DECISION ROUTE 
Local Government Scotland Act 1973 
SUPPLEMENTARY REPORT NO. 1 
(A) INTRODUCTION 
The purpose of this Supplementary Report (SR) is to bring Member’s attention to
two late representations received regarding the proposed development which is
addressed in Section B below.   
(B) FURTHER REPRESENTATION   
Two, further, late representations have been received from Kenneth and Catherine
Campbell, 2 Dungallan Terrace, Gallanach Road, Oban. 
Summary of issues raised: 
 Submitting comments on the details of the report submitted in support of the
application from Base Metal as follows: 
‘The report states that the FTMRG guide for good practice is “a minimum of 3
degrees pitch and between 3 and 5 degrees”.  Therefore, why has a roof pitch of
15 degrees being sought, this is at the very least 3 times what is needed. 
It is noted that the internal gutters are to be replaced to external gutters with the
report stating that “internal gutters are always risky”.  I would like to repeat my
past comments that this is the alleged problem and not the pitch of the roof.   
It is also with great interest that report states that “wind and rain has increased
by 30% in the previous 30 years”.  I am sure this would make no difference to the
pitch of a totally waterproof roof with a proper guttering system.   
Page 9 Agenda Item 7

Page 10

Issue is taken with the comment that “the pleasing aesthetic appearance of the
zinc roof will be more visible from the ground level”.  Is this part of the reason why
the higher pitch is being applied for, to give the building a more “pleasing
aesthetic feel”.  It can only be assumed that the company has never visited the
site and has been promised the work if this planning application is passed.   
Officer Comment: The comments regarding the report are noted, however, the
Planning Authority has to consider the proposal subject of the current planning
application, including the supporting roof report as submitted, it is not for the Planning
Authority to critique the report of a specialist. 
 Noting that, despite rain during a very wet summer, some extremely heavy at
times, there has been no attempt to carry out intermediate work on the roofs at
Kilbowie Shore.  If the water ingress is actually happening, or is as severe as
been advised, surely some attempt would have been made to lessen the
damage. 
Officer Comment:  Whilst this comment is noted, it does not represent a material
planning matter in the consideration of this application. 
 Raising concerns that the proposed rooflights, which are angled towards
Dungallan Terrace, will cause light pollution as some residents of Kilbowie Shore
leave their lights on all night. 
Officer Comment: The existing roofs contain rooflights and it is not considered that
having them at a slightly different angle will result in any significant light pollution. 
 The current buildings are not sitting low in the site, they are obtrusive,
unsympathetic and any further overdevelopment of a steep pitched roof will be in
direct conflict with the original planning approval.  While also at the detriment in
the long term of the visual amenity of the wider natural landscape. 
 It is noted that the visualisations previously submitted in support of the application
have been withdrawn and it is unclear as to whether the photographs submitted
by residents of Dungallan Terrace will still be considered as they clearly
demonstrated the difference between the proposed original plan and the reality
of what was built.   
Officer Comment: As set out in the main Report of Handling before Members, whilst
the overall height of the dwellinghouses will increase as a result of the new hipped
roof, the increase in height, approximately 1.57 metres, is not considered to be so
significant that the overall appearance of the dwellinghouses, or their setting within
the site and wider landscape will be adversely affected. 
Again, as set out in the main Report of Handling before Members, the dwellinghouses
have been built as approved in the previous planning application and associated non-
material amendment for a slight increase in height.   
The above represents a summary of the issues raised in this late representation.  Full
details of the representation is available on the Council’s Public Access System by
clicking on the following link Argyll and Bute - Planning Documents (argyll-
bute.gov.uk) 
Page 10

Page 11

(C) RECOMMENDATION   
That Members note the contents of the late representations and endorse the
recommendation of the Planning Authority that planning permission be granted
subject to the conditions and reasons appended to this Supplementary Report and
the main Report of Handling. 
Author of Report: Fiona Scott Date: 16/08/22 
Reviewing Officer: Tim Williams Date: 16/08/22 
Fergus Murray
Head of Development and Economic Growth 
Page 11

Page 12

CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 22/00231/PP 
1. The development shall be implemented in accordance with the details specified on the
application form dated 03/02/22, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date
Received
Location/Site Plan  100 A  31/03/22
Proposed Roof Plans  101 A  31/03/22
Existing Roof Plans  102  ** 04/02/22
Proposed West Elevations  103  ** 04/02/22
Terrace 1 – South East & North Elevations  104  ** 04/02/22
Terrace 2 – South, East and North
Elevations 
105 A  31/03/22
Terrace 1 – Section AA 106 ** 04/02/22 
Terrace 2 – Section AA 107 ** 04/02/22
Terrace 2 – Section BB 108 ** 04/02/22
Terrace 2 – Section CC 109 ** 
Existing West Elevations Terraces 1&2  110 ** 31/03/22
Roof Report – 3 PAGES    
Report on Design Alterations    07/07/22 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
Note to Applicant: 
 This planning permission will last only for three years from the date of this decision
notice, unless the development has been started within that period [See section
58(1) of the Town and Country Planning (Scotland) Act 1997 (as amended).] 
 In order to comply with Sections 27A(1)  of the Town and Country Planning
(Scotland) Act 1997, prior to works commencing on site it is the responsibility of
the developer to complete and submit the attached ‘Notice of Initiation of
Development’ to the Planning Authority specifying the date on which the
development will start. Failure to comply with this requirement constitutes a breach
of planning control under Section 123(1) of the Act. 
 In order to comply with Section 27B(1) of the Town and Country Planning
(Scotland) Act 1997 it is the responsibility of the developer to submit the attached
‘Notice of Completion’ to the Planning Authority specifying the date upon which the
development was completed. 
Both the Notification of Initiation and Notification of Completion forms referred to
above are available via the following link on the Council’s website: 
https://www.argyll-bute.gov.uk/planning-and-environment/make-planning-
application   
Page 12