Issue: Infrastructure – Cemetery Provision
Corresponding NPF4 Policy/Policies:
• NPF4 Policy 18: Infrastructure First
• Other key NPF4 policy connections in relation cemetery provision:
o Policy 1 – Tackling the climate and nature crises
o Policy 2 – Climate mitigation and adaptation
o Policy 3 – Biodiversity
o Policy 13 – Sustainable Transport
o Policy 14 – Design, quality and place
o Policy 15 – Local living and 20 minute neighbourhoods
o Policy 20 – Blue and green infrastructure
o Policy 22 – Flood risk and water management
Corresponding Perth and Kinross LDP3 Topic Paper:
Topic Paper 014: Infrastructure 
Information required by the Act and NPF4 regarding the topic:
There are no specific requirements of the Act or NPF4 in relation to
cemetery provision, however it is a key land use component to be
considered when preparing the Proposed Plan.
Links to Evidence:
• PKC - Existing burial ground sites
• PKC – Future Cemetery Provision Strategy (2016)
• SEPA Guidance on Assessing the Impacts of Cemeteries on
Groundwater 
Summary of Evidence:
Existing Cemetery/Burial Provision
There are 176 burial grounds in 132 locations throughout the Perth and
Kinross area. There are burial sites across each of the localities in the
Council area. Existing burial ground sites have been mapped. The Council
also operates a Crematorium site in Perth.
There are private burial grounds including Holy Trinity (Pitlochry) and St
Kessogs (Auchterarder). There is also a private woodland burial ground at
Strowan Woodland Cemetery (near Crieff).
Cemetery Infrastructure: Condition, quality and needs
In 2016, the Council’s Bereavement Services published a Future Cemetery
Provision Strategy. As a result of pressures on existing burial provision, the
Strategy supports decision-making in relation to where cemeteries should
be extended, closed or new ones provided. The Strategy considers a range
of factors such as land availability, physical suitability, accessibility, costs,
and future maintenance. The Council’s Bereavement Services keeps an up-
to-date record of the current condition/capacities of existing sites,
including an indication when sites will be at full capacity.
Since the publication of the Strategy, a working group has been formed
with representatives from various teams within the Council to support the
delivery of the Strategy’s aims, including investigating the potential for
extended/new sites. An extensive desk-top based assessment has
reviewed potentially suitable/available land across Perth and Kinross area

Page 3

for sites. This assessment has helped guide the consideration of sites
recently. Three extensions have been completed since 2016 at the
Madderty, Clunie and Kinross sites.
Through the preparation of the current Local Development Plan (LDP2,
2019), several cemetery search areas were identified as potential areas to
investigate feasibility of new/extended cemetery provision. These sites
have required test digs and further discussion(s) with landowners to
confirm suitability. The sites include:
• Blairgowrie (MU330) allocation
• Milnathort (Old Perth Road)
• Perth (Isla Road)
• Perth West Strategic Development Site
SEPA have published a planning guidance note for cemeteries (Guidance
on Assessing the Impacts of Cemeteries on Groundwater). It provides
guidance on the protection of the water environment from cemetery
developments and is for developers and local authorities intending to
expand or construct human cemeteries.
Summary of Implications for the Proposed Plan:
As part of the next Local Development Plan (LDP3), further collaboration
will take place with the working group to consider potential sites for
further cemetery provision. This will include consideration of allocating
sites/search areas through the Proposed Plan. The provision of
extended/new cemetery provision could also provide multiple benefits,
linking into other key policy considerations such as green infrastructure
and open space, and biodiversity.
Finding land that is available and suitable can be an issue due to a range of
factors. The LDP3 can support the identification of potentially suitable sites
for extended or new cemetery provision, with a range of actions identified
for supporting site delivery including undertaking test digs, detailed site
assessments, and consultation with relevant consultees/stakeholders. A
collaborative approach to identifying sites for extended/new cemetery
provision will be needed given the range of issues when assessing
available/suitable land. If there are sites that are potentially
available/suitable, the Proposed Plan will consider how these will be best
delivered through the planning process i.e. allocation with site
requirements. 
Gaps, Uncertainties or Key Issues Raised:
Finding suitable land for potential burial ground/cemetery provision will
potentially compete with other demands on land such as housing,
particularly close to existing settlements. With this in mind, there may be
an opportunity for mixed use sites to help deliver cemetery provision
alongside other appropriate land uses. The demand for additional
burial/cemetery provision will need to inform the spatial strategy for the
Proposed Plan to ensure suitable sites are identified, where required.
Summary of Stakeholder Engagement:
We engaged with the Council’s Bereavement Services team on the
development of the Topic Paper.

Page 4

Statements of Agreement/ Dispute:
Respondent Agree or Dispute Summary of Comments PKC’s Response
Gray Planning &
Development Ltd
o/b/o GS Brown
Construction Ltd
Neither List of Evidence/Datasets and Summary of Implications for
Proposed Plan (PP): The respondent neither agreed or disagreed
with the Evidence/Datasets or the Summary of Implications for the
PP.   
Further Comments: The respondent notes that in the context of
LDP3 supporting the identification of potentially suitable sites for
extended or new cemetery provision, landowners with assets
suitable for a mix of land uses potentially led by housing have a key
role and can offer deliverable solutions to this matter.
Formal Dispute: The respondent does not wish to make a formal
dispute.
Comments noted. Opportunities for
delivering developments that provide
multiple benefits will be considered
through the development of the
Spatial Strategy and associated
development allocations. 
Aberfeldy
Community Council
Neither List of Evidence/Datasets and Summary of Implications for
Proposed Plan (PP): The respondent neither agreed or disagreed
with the Evidence/Datasets or the Summary of Implications for the
PP.   
Further Comments: The respondent notes that in the context of
LDP3 supporting the identification of potentially suitable sites for
extended or new cemetery provision, the Community Council is
actively exploring with the Council’s Bereavement Services a new
site in Aberfeldy for additional burial provision.
Formal Dispute: The respondent does not wish to make a formal
dispute.
Comments noted. PKC will continue to
have dialogue with the Community
Council, landowner(s) and any
relevant stakeholders to consider the
cemetery/burial provision in the
Aberfeldy area. This will inform the
wider consideration of future
cemetery/burial provision through the
LDP3 Spatial Strategy.

Page 5

Issue: Infrastructure – Communications and Digital
Infrastructure
Corresponding NPF4 Policy/Policies:
• National Planning Framework, Policy 24 Digital Infrastructure
• Other key NPF4 policy connections - 1: Tackling the climate and
nature crises; 4: Natural Places; 8: Green belts; 11: Zero Waste; 14:
Design, quality and place; 15: Local Living and 20 minute
neighbourhoods; 18: Infrastructure first; 23: Health and safety; 25:
Community wealth building; 26: Business and industry; 27: City,
town, local and commercial centres; 29: Rural development.
Corresponding Perth and Kinross LDP3 Topic Paper:
Topic Paper 014: Infrastructure 
Information required by the Act and NPF4 regarding the topic:
Section 15(5) clarifies matters that need to be considered for the creation
of the local development plan spatial strategy, including: 
(d) the infrastructure of the district (including communication systems) and
(e) how that infrastructure is used. 
NPF4 Policy 24 expects Local Development Plans to:
• Support the delivery of digital infrastructure, including fixed line
and mobile connectivity, particularly in areas with gaps in
connectivity and barriers to digital access
The policy intent for Policy 24 is noted as:
• to encourage, promote and facilitate the roll-out of digital
infrastructure across Scotland to unlock the potential of all our
places and the economy
The policy outcomes for Policy 24 are:
• appropriate, universal and future proofed digital infrastructure
across the country
• local living is supported and the need to travel is reduced
The Scottish Government’s Local Development Plan Guidance (May 2023)
under its ‘step by step guide’ provides advice on relevant evidence for the
NPF4 policy topics to help planning authorities in considering the national
policies when preparing their evidence report.
With respect to NPF Policy 24, the guidance advises that the existing and
future provision of digital infrastructure can inform the development of
the spatial strategy, as an enabler of increased access to services,
amenities, facilities and jobs. It also supports investment and population
growth in rural areas by specifically addressing the digital divide. 
Digital communications operators will be expected to minimise visual and
amenity impacts, and to take into account cumulative impacts and relevant
technical constraints.
Links to Evidence:
• Ofcom ‘Connected Nations’ 2023 Scotland report
• Ofcom ‘Connected Nations’ 2023 interactive report dashboard

Page 6

• Perth and Kinross Council’s public wi-fi map
• Signal Checker – Perth and Kinross
• Digital Scotland - Superfast Broadband report 2020 
• Digital Scotland – R100 programme strategy
• Scottish Government, A changing nation, how Scotland will
thrive in a digital world
Summary of Evidence:
Data from Ofcom’s fixed local authority data (as summarised in the
interactive dashboard) compiles information for fixed networks and
wireless access providers. Using ordnance survey data, the dataset for
Perth and Kinross council area includes 80,949 premises in total, including
residential and commercial units. 11,024 premises (a 13.6%) were found to
have full fibre available, while 954 premises (1.2%) receive less than
2Mbps. 
The availability figures for full fibre are lower than the national average,
with 52% of Scotland’s premises having coverage from the fibre fixed
broadband network. These figures are in turn the lowest of the UK nations,
with the average for the UK being 56% as at September 2023. 
In Perth and Kinross, Superfast broadband coverage is 89.14%, lower than
neighbouring local authorities such as Dundee (99.1%), Stirling (93.4%),
Fife (98.4%) and Angus (89.5%).
USwitch has published a summary of costs for broadband services across
UK countries. Scotland shows an average cost of £27.12 per month. This is
higher than the UK average (£26.90) and for England and Wales (£26.88
and £26.87, respectively). 
Perth and Kinross Council operates a network of 19 public wi-fi hotspots
from premises including community campuses, libraries, sports centres,
museums and galleries, and council offices in Perth city centre.
Coverage for mobile services in Perth and Kinross varies between 23% (5G)
and 78% (4G). As per Ofcom’s Connected Nations report, the local
authority is ranked 76th out of 96 areas in the UK for mobile coverage. 
As part of the Reaching 100% (R100) programme, the Scottish Government
supported improvements to the Superfast broadband to all premises in
Scotland. The programme had completed over one million connections to
homes and businesses. Commercial premises in Perth and Kinross
benefitted from the scheme, increasing access to digital connectivity from
41.2% (baseline data OMR 2012) to 96.1% by June 2020. Additional
support for the R100 programme is given in the Scottish Government’s
digital strategy A changing nation: how Scotland will thrive in a digital
world. 
In addition to the R100 rollout programme, the Scottish Broadband
Voucher Scheme (SBVS) offers £5,000 to commercial or residential
premises that can’t access connectivity speeds over 30Mbps and are not in
scope of the standard R100 build programmes. At July 2024, over 4,300
premises had used the voucher scheme to improve their broadband, with
another 800 planned. 
The Shared Rural Network was developed by the UK government and
Mobile Network Operators to deliver 4G coverage to 95% of the UK
landmass by the end of 2025, enabling rural businesses and communities
to thrive.

Page 7

Summary of Implications for the Proposed Plan:
Informed by the content of the National Planning Framework 4 (NPF4) and
in accordance with the Perth and Kinross Council Corporate Plan, the Local
Development Plan will encourage initiatives to improve digital connectivity
for residential and commercial premises across the local authority. This will
in turn allow for businesses and local communities to prosper, accessing
opportunities previously out of reach due to infrastructure constraints.
Additionally, the provision of better digital connectivity is expected to
contribute to a reduction in the need to travel, addressing wider policy
objectives set by the Scottish Government. 
Gaps, Uncertainties or Key Issues Raised:
No data gaps have been identified.
The key issues raised are:
• the communications and digital infrastructure of the Proposed Plan
area has shortcomings, creating competitive disadvantages for local
businesses and communities; and
• the Proposed Plan will need to encourage initiatives to improve
digital connectivity
Summary of Stakeholder Engagement:
Big Place Conversation 
The Council carried out its ‘Big Place Conversation’ exercise to kick start
the LDP3 process across Perth and Kinross communities during most of
2023. This was a substantial exercise involving over 100 events throughout
the Council area. The events ranged from drop-in information sessions,
meetings, and online surveys to workshops and online sessions using the
Place Standard Tool to capture the views of local communities about
different aspects of their places. 
The results of the BPC are summarised as part of a separate report on the
outcomes and findings across the different locality areas.
LDP3 Evidence Report Topic Papers
The Council produced a series of LDP3 Evidence Report Topic Papers,
covering the individual subject matters of NPF4’s suite of national planning
policies.  These papers, which set out the detailed evidence the Council has
gathered to help produce our Evidence Report and which we hope to use
to help prepare our Proposed Plan, were published on the Council’s
Consultation Hub and open for comments for a period of 6 weeks during
July and August 2024.  As part of our consultation process for LDP3 Topic
Papers we welcomed the views of our key stakeholders (who were
contacted specifically via email regarding the consultation exercise) and
the public at large, on the sufficiency of the evidence gathered, our
interpretation of the implications of that evidence to the Proposed Plan,
and on how we intend to use that evidence to develop our LDP3.  We also
asked respondents to provide links to other sources of available
information or data which they felt we had not included, alongside an
explanation of why they considered any additional sources of information
to be relevant to the preparation of the LDP.
Statements of Agreement/ Dispute

Page 8

One response was received with comments specifically addressing the
Communications and Digital Infrastructure topic paper. The comment was
from Kenmore and District Community Council, which made constructive
reference to ensuring its community received benefit from broadband
improvement programmes.
A summary of the Community Council’s comment, its status, and the
Council’s response are provided in the table below. 
There were no formal disputes to the Evidence Report.
Views on the Infrastructure of the Area
Under Part 2, Section 16B(3) and Section 15(5)(d)-(e) of the Planning Act
2019, in the preparation of their Evidence Report, planning authorities are
required to provide their views on the infrastructure of the plan area, and
how that infrastructure is used.
The data provided highlights current shortcomings regarding digital
connectivity in Perth and Kinross. This creates competitive disadvantages
for local businesses and communities, presenting a clear challenge for
Perth and Kinross to meet some of its Corporate objectives. It will be
necessary to establish positions of clear support to development proposals
that enhance digital capacity while observing the principles of sustainable
and desirable development.

Page 9

Statements of Agreement/ Dispute:
Respondent Agree or Dispute Summary of Comments PKC’s Response
Kenmore and
District
Community
Council
Neither agree nor
disagree
List of Evidence/Datasets and Summary of Implications for
Proposed Plan (PP): In respect of communications and digital
infrastructure, the respondent wishes to ensure that there is a
benefit to the Kenmore & District community from the
broadband improvements being conducted in the area.
Formal Dispute: No
The respondent’s comments on the
need for broadband improvements
to be felt across the Community
Council area broadly reflect the
aims of the programmes to extend
coverage, especially in areas where
need is greatest. 
The Proposed Plan will encourage
initiatives to improve connectivity
and extend coverage.

Page 10

Issue: Infrastructure First – Education Facilities 
Corresponding Perth and Kinross LDP3 Topic Paper:
Topic Paper 014: Infrastructure  
Corresponding NPF4 Policy/Policies:
• Policy 18: Infrastructure First
• Other key NPF4 policy connections:
o Policy 15: Local living and 20-minute neighbourhoods
o Policy 27: City, town, local and commercial centres
Information required by the Act and NPF4 regarding the topic:
Section 15(5) requires local authorities to take into account the following
matters in its local development plan spatial strategy: (ce) of the Act “the
education needs of the population of the district and the likely effects of
development and use of land on those education needs”, (cg) “the capacity
of education services in the district”, (d) “the infrastructure of the district
(including … education facilities)”, and (e) “how that infrastructure is
used”. 
National Planning Framework 4 (NPF4) Policy 18: Infrastructure First
requires that Local Development Plans and delivery programmes should be
based on an integrated infrastructure first approach. Plans should: be
informed by evidence on infrastructure capacity, condition, needs and
deliverability within the plan area, including cross boundary infrastructure;
set out the infrastructure requirements to deliver the spatial strategy,
informed by the evidence base, identifying the infrastructure priorities,
and where, how, when and by whom they will be delivered; and indicate
the type, level (or method of calculation) and location of the financial or in-
kind contributions, and the types of development from which they will be
required.
The Scottish Government’s Infrastructure Investment Hierarchy is
promoted in National Planning Framework 4 (NPF4), it prioritises
enhancing and maintaining existing assets, then repurposing and co-
location of assets, then new-build assets. Maximising the use of existing
assets is therefore the preferred option when considering new
infrastructure requirements.
The Proposed Plan will take forward an evidence-based understanding of
the infrastructure requirements needed to support development, aligning
with national, regional and local strategies. 
Planning for education infrastructure in Perth and Kinross is essential for
accommodating existing residents and future residents in the area. The
appropriate infrastructure must be capable of supporting new housing
development and local population changes.

Page 11

Links to Evidence:
• National Records of Scotland 
o Population Estimates 2022
• Perth and Kinross Council 
o Learning Estate Strategy 2021
o Learning Estate Management Plan 2021
o Housing Land Audits
o Methodology for Calculating Pupil Product Ratio [CORE DOC
CD31]
• Scottish Government 
o School Education Statistics 2024 [CORE DOC CD32]
o Infrastructure Investment Plan 2025-26
o Pupil Projections 2022-27

Page 12

Summary of Evidence:
An ‘Infrastructure First’ approach includes an assessment of the capacity of
existing infrastructure and services. This will help to reduce evidence gaps
and enable the delivery of priorities for education facilities. The key
evidence sources have been set out in the accompanying Topic Papers and
the links highlighted above.
The Council’s Education & Children’s Services Learning Estate Strategy
outlines the strategy to consider the development and management of the
Learning Estate in context of meeting national and local outcomes,
planning ahead and providing best value and benefits to communities. It
also aligns with the Council’s 6-Year Funded Delivery Programme, Medium-
term Financial Plan, Investment Blueprint and 30-year Investment Plan. The
Learning Estate Management Plan (LEMP) delivers the Learning Estate
Strategy and is reviewed every 3 years. 
Demographics
Between 2001 and 2021, the population of Perth and Kinross has increased
by 14.0%. This is the 7th highest percentage change out of the 32 council
areas in Scotland. However, between 2001 and 2021, the ‘0 to 15’ age
group saw the largest percentage decrease (-5.2%). The 75 and over age
group saw the largest percentage increase (+48.9%).  Over the next 10
years, the population of Perth and Kinross is projected to decrease by 3.5%
due to natural change (more deaths than births). The number of school-
age children in the area is therefore not expected to increase in population
projections.   
Perth and Kinross Council carried out ‘A methodology for calculating the
pupil per household ratio for areas of new housing developments’
(September 2008) [CD31]. This pupil product ratio informs the
management of the school estate, pupil forecasting, and developer
contributions. The ‘pupils per household’ ratios were found to be: Primary
0.27, and Secondary 0.15. The study was completed some time ago and an
update would benefit LDP3. 
The Learning Estate 
The Perth and Kinross Learning Estate comprises 69 primary schools, 11
secondary schools, 1 stand-alone Nursery, and 1 Additional Support Needs
(ASN) school. All primary and secondary schools have agreed catchment
areas. Any proposed changes to catchments areas are required to be
considered under the process of the Schools (Consultation) (Scotland) Act
2010. Maps showing the locations of facilities are included [Fig1, Fig 2, Fig
3 and Fig 4].
Perth and Kinross currently has six community campuses where education
facilities are co-located with other facilities, such as libraries, leisure, and
other services. Co-location of public services within community ‘hubs’
maximises existing assets, supporting other objectives set out in NPF4 for
‘Liveable Places’.  
With schools representing approximately 80% of the Council’s property
estate, the Learning Estate Strategy helps to inform the development of
the Council’s Corporate Property Asset Management Framework, which

Page 13

sets out the future strategy direction for all Council-owned property
assets. 
Investment in the Council’s school estate was previously set out through
the School Estate Transformation Programme. The investment into the
school estate addressed issues arising from changing population, LDP site
allocations across the local authority area, ongoing deterioration of
building infrastructure, pressure on planned maintenance budgets, and the
extension of Early Years provision and Free School Meals. As reported in
the 2021 Learning Estate Management Plan, a total of £81m has been
invested in the school estate since 2015/2016 and the programme will
deliver £160m of further improvements to the Learning Estate between
2021 and 2029. The Council approved its updated 8-year capital
programme in October 2021.
The Scottish Government’s Learning Estate Investment Programme (LEIP)
set £2billion in total estimated capital investment, managed by Scottish
Futures Trust, benefitting around 50,000 pupils across Scotland. The LEIP
aims to support school infrastructure projects that are low emission,
digitally enabled and better connected to their local communities. Two
projects in Perth and Kinross were included in Phase 2 of the programme,
with North Perth Primary School (Riverside Primary School), opened 2024,
and replacement Perth High School project, estimated completion in 2025.
Both projects are designed to Passivhaus Standard.
Education infrastructure is an essential part in creating and supporting
local communities. Capacities in schools are directly affected by new
housing development and is therefore a key consideration when assessing
sites for new housing in LDP3. The principles set within the Council’s
Learning Estate Strategy align with NPF4, the National Investment
Hierarchy, and education-specific priorities (the National Improvement
Framework, and Scotland’s Learning Estate Strategy: Connecting People,
Places and Learning). This prioritises maximising existing property and
infrastructure.

Page 14

Fig 1: Location of Nurseries around Perth and Kinross

Page 15

Fig 2: Location of Nurseries in Perth City area

Page 16

Fig 3: Location of Primary Schools and Catchments around Perth and
Kinross

Page 17

Fig 4: Location of Secondary Schools and Catchments around Perth and
Kinross

Page 18

School Estate Statistics (Condition, Suitability, Capacity)
A copy of the Scottish Government School Estate Statistics (2024) for Perth
and Kinross schools are submitted with this Evidence Report [CD32].
Condition
In terms of the condition of primary and secondary school estates in Perth
and Kinross, the majority of schools published as part of the Scottish
Government School Estate Statistics 2024 were rated ‘Good’ and
‘Satisfactory’, however one primary school and one secondary school were
rated ‘Poor’. This classification means: “showing major defects and/or not
operating adequately (physical element does not carry out function
effectively without continuous repair, shows signs of age and does not
consider most of the transverse elements)”. No schools were rated ‘Bad’. 
Suitability
In terms of the suitability of primary and secondary schools’ estates in
Perth and Kinross, the majority of schools published as part of the Scottish
Government School Estate Statistics 2024 were rated ‘Good’ or
‘Satisfactory’, however one primary school and two secondary schools
were rated ‘Poor’. This classification means: “showing major problems
and/or not operating optimally (the school buildings and grounds impede
the delivery of activities that are needed for children and communities in
the school)”. No schools were rated ‘Bad’. 
Capacity
Capacity levels in the Perth and Kinross learning estate will be set out by
group: early years, primary, secondary, and ASN. In considering occupancy
levels, it is the overall approved capacity of schools that is considered (this
is also referred to as ‘planning capacity’). 
In managing the learning estate, Perth and Kinross Council also refer to the
‘approved capacity’ and ‘working capacity’ of a school. The approved
capacity is the maximum number of pupils that could attend the school.
The working capacity changes every year and is dictated by factors
including room size, number of pupils in each year group and the Perth &
Kinross Council Staffing Standard. These terms inform the Learning Estate
Strategy and Learning Estate Management Plan, but are less relevant to
the Local Development Plan.
The current framework for funding education infrastructure via developer
contributions (per Circular 3/2012) is applied to providing pupil capacity to
mitigate the impact of new development and is not used to address
staffing, condition or existing deficiencies. Funding for the improvements
to the school estate un-related to capacity pressure is therefore managed
by Perth and Kinross Council as the education authority for the area. 
Early Years
Early Learning and Childcare (ELC) provision within Perth and Kinross
consists of:  49 local authority nursery settings operating within our
primary schools and 46 funded provider settings offering funded ELC.
There are 19 rural primary schools that do not have nursery provision 
onsite.
Perth and Kinross Council’s Early Years learning and childcare is a request-
based system, as opposed to catchment-based system with schools. Local
Authorities have a statutory duty to consult every two years on the
provision of ELC to inform the planning and delivery of services

Page 19

(consultation last took place in 2024).  The availability and demand for
Early Years places is therefore subject of regular monitoring and review. 
The delivery of “1140 hours Early Learning and Childcare” has been a
priority of Perth and Kinross for Early Years provision. By August 2021, all 3
and 4-year-olds, and some eligible 2-year-olds, were entitled to 1140 hours
of funded ELC. In planning for the expansion, the Council looked to existing
resources in order to meet the demand for spaces. A significant
programme of works took place to increase the physical capacity of the
nursery estate without adding to the Council’s asset base. This is described
in the Learning Estate Strategy as “an excellent example of delivering best
value through maximising occupancy and making the best use of existing
resources”. 
Education and Learning Services anticipate that Early Years infrastructure
can continue to accommodate children, on the basis of population changes
and housebuilding activity. It is not envisaged that developer contributions
policy will be expanded to include Early Years provision. 
Primary Schools
According to the Scottish Government School Estate Statistics 2024,
primary school pupil rolls in Perth and Kinross have decreased in number
since 2018, which is broadly consistent with patterns across Scotland. 69
primary schools in Perth and Kinross were surveyed as part of the School
Estate Statistics, which found that some primary schools in Perth and
Kinross have particularly low pupil numbers (11 schools at less than 50% of
capacity) and some have high capacity (5 schools at 90-100% of capacity),
however no schools are currently over-subscribed (roll greater than
capacity).  
Scottish Government Pupil Projections for Scotland and Local Authorities
2022-2027 for Perth and Kinross show a decline in Primary School pupil
numbers during this period, which reflects the national trend.
Perth and Kinross Council monitor pupil rolls in relation to housing
development published in the Council’s annual Housing Land Audit, as well
as planning applications for windfall development (sites of 5 or more
homes).  
In 2007, Perth and Kinross Council adopted the primary school classroom
space standard of 2m2 per pupil, along with legislative space standards. In
May 2018, the Council adopted (Report No. 18/158) a space capacity
metric measurement of 1.7m2 for schools, as an additional mechanism to
manage the accommodation available in primary schools, where there are
challenges in accommodating catchment children. This allows the Council
to ensure that teaching staffing budgets are not exceeded while ensuring
catchment children have the best opportunity to attend their catchment
school. 
However, other interventions by Perth and Kinross Council may be
required in order to accommodate development growth in certain primary
school catchments and support the LDP’s spatial strategy, including
extensions and replacement schools, in order to accommodate further
capacity. A proportion of this investment by Perth and Kinross Council is
recouped via the developer contributions policy for school projects, where
additional pupil capacity is created as a result of cumulative new
development. This is a longstanding policy (introduced from 2009) which is
applied to eligible development in catchment areas where capacity is
created.

Page 20

There is also site-specific mitigation included in the LDP. A new school may
be required as part of a site allocation, in these cases the developer is
responsible for the delivery the required infrastructure, or financial sum in
lieu of delivery, typically secured via Section 75 Legal Agreement.
Secondary Schools
According to the Scottish Government School Estate Statistics 2024,
secondary school pupil rolls in Perth and Kinross have increased in number
since 2017, this is also consistent with patterns across Scotland.  There are
11 secondary schools in Perth and Kinross, and the School Estates Statistics
found that one school has a roll less than 50% of capacity and one school
has a roll 90-100% of capacity, again with no schools currently over-
subscribed. 
The Scottish Government Pupil Projections for Scotland and Local
Authorities 2022-2027 for Perth and Kinross indicate an increase then
decrease in secondary pupil numbers; which reflects the national trend.
Perth and Kinross Council’s Education and Children’s Services monitor
pupil rolls in relation to housing development completions and projections
(via the Housing Land Audit) and anticipate that existing secondary school
infrastructure can accommodate pupil projections, calculated on the basis
of population changes and housebuilding activity. Perth and Kinross
Council’s developer contributions policy approach therefore remains
relevant to primary education capacity requirements, and it is not
envisaged developer contributions will be required for capacity provision
in secondary schools. 
Additional Support Needs
Perth and Kinross has one specialist Additional Support Needs (ASN)
school; Fairview School is a purpose-built special education school that
serves children and young people aged 3 to 18 years old with profound
and complex ASN. The school has a capacity of 65 pupils and operates at
full capacity most years. For both condition and suitability, Fairview School
was rated ‘Satisfactory’.
Across Perth and Kinross, there are 15 Intensive Support Provisions (ISPs)
based within nine primary schools and six secondary schools. Together
these ISPs provide special education for children and young people aged 5
to 18 years old. The current overview of placements across primary and
secondary Intensive Support Provisions is as follows:

Page 21

The current distribution of schools with an ISP means that some of the
secondary schools and their associated group of catchment primary
schools do not have an ISP, resulting in children and young people being
placed in a school outside their local community. 
ASN provision is currently a priority for the Council; the Learning Estate
Management Plan includes the upgrade programme of works to enhance
the Learning Estate to meet the needs of children and young people with
ASN (Action 2.2.5). In January 2025, the Council’s Learning and Families
Committee approved recommendations for a programme to improve
intensive-level education provision for complex ASN in all Perth and
Kinross school localities. 
Summary of Implications for the Proposed Plan:
Information on school rolls, pupil projections, and housing completions will
be utilised in the preparation of Proposed LDP3. 
The Learning Estate Strategy, Learning Estate Management Plan, and
Corporate Asset Management Plan are relevant in determining Council
priorities for investment within certain catchment areas. Revisions or
updates to these documents will be referenced as they become available.
Site allocations in the adopted LDP include relevant developer obligations
for education infrastructure, including the relevant planning consent
and/or Section 75 Agreement. Where a new site allocation in LDP3 will
result in a requirement for site-specific education infrastructure, the
Council will consider the existing provision the school catchments and
determine appropriate mitigation to be included with the site allocation’s
development criteria.

Page 22

Gaps, Uncertainties or Key Issues Raised:
The ‘Infrastructure First’ approach promoted in Policy 18 of NPF4 will be
implemented in the preparation of the Proposed Plan; “The impacts of
development proposals on infrastructure should be mitigated.
Development proposals will only be supported where it can be
demonstrated that provision is made to address the impacts on
infrastructure.”
Infrastructure requirements, in this case, additional school roll capacity
needed to accommodate new development proposals for LDP3 will be
assessed by the Council by reviewing individual primary catchment areas
and capacity across the relevant secondary cluster. Forecasting pupil
numbers is difficult to undertake with precision. Programming accurate
housing completions, via the Housing Land Audit, is essential to planning
for investment in the learning estate. Related to programming future
development is estimating pupil generation from new developments. The
methodology for calculating the ‘Pupil Product Ratio’ was developed in
2008 and it is proposed this be updated to ensure this forecasting is
informed by relevant data.
The Council has an ongoing priority to improve ASN provision in schools
across the local authority area and is currently reviewing funding options
to deliver additional capacity. 
Summary of Stakeholder Engagement:
The Council produced and consulted on a series of Topic Papers which
covered the individual subject matters of NPF4’s national planning policies
suite.  These papers set out in detail the evidence the Council has gathered
to help produce our Evidence Report, and which we hope to use to
prepare our LDP3 Proposed Plan. The papers were published on the
Council’s Consultation Hub for a 6-week period during July and August
2024.  As part of our consultation process for LDP3 Topic Papers we
welcomed the views of our key stakeholders (who were contacted
specifically via email regarding the consultation exercise) and the public at
large, on the sufficiency of the evidence gathered, our interpretation of the
implications of that evidence to the Proposed Plan, and on how we intend
to use that evidence to develop our LDP3.  We also asked respondents to
provide links to other sources of available information or data which they
felt we had not included, alongside an explanation of why they considered
any additional sources of information to be relevant to the preparation of
the Local Development Plan.
Through this process, internal Perth and Kinross Council services were
notified of this process and associated statutory requirements. A cross-
service meeting with senior officers across various Council services
including Property, Roads Infrastructure and Transport Planning, Economic
Development and Place Development Services, was held to present the
Infrastructure Topic Paper prior to publication for consultation. No specific
points were raised with regards to Education. 
Whilst officers from the Council’s Education and Learning Services did not
return comments on the Topic Papers, officers from Property Services
(Education) did provide feedback, set out in the table below. Property
Services (Education) also assisted with the preparation of the Evidence
Report.

Page 23

Homes for Scotland have suggested utilisation of a Pupil Product Ratio and
pupil forecasting in determining education needs. The Council is assessing
options for renewing the Pupil Product Ratio methodology, which will incur
resource. Pupil forecasting is complex and is not always accurate and will
continue be utilised for indicative purposes. 
Views on the Infrastructure of the Area:

Page 24

Statements of Agreement/ Dispute:
3 responses were received on our Infrastructure Topic Paper in relation to Education.  1 respondent agreed and 2 neither agreed or disagreed with the
evidence identified through Topic Paper 014, and the summary of the implications of that evidence for the Proposed Plan provided by the Council.  A
summary of these comments, their status, and the Council’s response are provided in the table below.  None of the respondents wished their comments to
be treated as a formal dispute to the Evidence Report.  
Statements of Agreement/ Dispute:
Respondent Agree or Dispute Summary of Comments PKC’s Response     
Agree/ Disagree/
Neither *delete as
appropriate
List of Evidence/Datasets and Summary of Implications for
Proposed Plan (PP): **can split these up separately if the amount
of text warrants it**   
Further Comments: 
Formal Dispute: 
Homes for Scotland Neither Whilst it is positive that all primary and secondary schools within
the Council area are operating within capacity HFS recognises the
need for the Council to review the service delivery for schools with
capacities below 50% or between 90-100%. When reviewing the
latter it is suggested that in order to ensure that education
capacity is not a constraint to development a sequential approach
to overcoming constraints should be utilised, this would include: 
a) Consider whether the mitigation required is only
temporary and an interim solution over a short period (3 to 5
years) is possible, such as temporary classrooms on internal
reconfiguration.   
b) Consider whether an extension to the existing catchment
schools is feasible.   
Noted – the Property (Education)
Service monitor pupil capacity across
the school estate using population
data, housebuilding projections and
planning decisions. 
The interventions considered by ECS
align with the Scottish Government’s
Infrastructure Investment Hierarchy
also shared by the respondent, i.e.
prioritising existing assets. 
The Council continues to work with
developers, with a dedicated
Development Contributions Officer, to
determine the best route to deliver

Page 25

Respondent Agree or Dispute Summary of Comments PKC’s Response
c) Consider whether it is possible to undertake a catchment
review to realise available capacity in a nearby school subject to
statutory consultation on this procedure. 
infrastructure and not impede
delivery of homes.
The council refer to 2018-based pupil projections in paragraph 4.29
for the period 2022-27 and current rolls within 4.10 and 4.13.
Given the variation in figures over the period it is suggested that
the Council undertake bi-annual forecasting and apply the cohort
progression model to understand the capacity of individual schools
and the school estate as a whole. The cohort progression model
has been supported at appeal (Appeal Ref: PPA-150-2010) and will
ensure that school roll forecasting complies with the five tests
within NPF4 Policy 18 – Infrastructure first.   
Alongside forecasting of school rolls it is also suggested that the
Council identify the pupil product for housing in the Council area.
The product for a range of recently completed developments
should be considered alongside those of developments completed
five and ten years ago to understand how the pressure on schools
rolls can potentially ‘spike’ before finding its natural level. 
Noted. The Council uses a Pupil
Product Ratio for determining pupil
estimations arising from new
development. It has been
acknowledged that this may benefit
from updating for LDP3.
Formal Dispute: 
No
- 
Earn Community
Council
Neither Topic Paper paragraph 3.2 “Policy 18 – Infrastructure First is also
relevant here; to encourage, promote and facilitate an
infrastructure first approach to land use planning, which puts
infrastructure considerations at the heart of placemaking” - not
only for Transport but also Education & Health 
Education
Local pupils educated at local schools.
Support local staff (HM) to stay at small schools, financial
incentives?
Noted

Page 26

Respondent Agree or Dispute Summary of Comments PKC’s Response
Start PS later (Age 7?)
Develop outdoor kindergartens to allow healthy, active play as part
of the structure to support later start. 
The idea of “Repurposing” buildings was part of the plan. This
would fit well with for Bridge of Earn - A new Primary school and
the reuse of current building. 
Formal Dispute: 
No
- 
PKC Property
(Education) Services
Agree Insert link to PKC Lifelong Learning Committee 16.5.18 Maximising
Primary School Capacities Report No. 18/158 and Appendix
1).  Also cross refer to the LEMP for current capacities.   
Documents have now been made
available on the PKC website by the
Service and links now included.
Current LEMP is referenced (2021),
but Scottish Government’s School
Estate Statistics (2024) provides more
up-to-date data. 
Comment in relation to Topic Paper 014 paragraph 4.9: In 2007,
PKC adopted the primary school classroom space standard of 2m2
per pupil, along with legislative space standards.  In 2018 PKC
agreed, along with legislative space standards, the Executive
Director (Education and Learning Services) can apply the Scottish
Government Guidance of 1.7m2 per pupil for primary schools, if
required, to accommodate children living in the catchment area. 
As above
Unsure as to whether information on Attendance and Attainment
is necessary. 
Agreed – reference is now removed
Formal Dispute: 
No
-

Page 27

Topic 11 (d): Infrastructure – Health Care Facilities
Corresponding Perth and Kinross LDP3 Topic Paper:
Topic Paper 014: Infrastructure (TP0014_Infrastructure.pdf) 
Corresponding NPF4 Policy/Policies:
• Policy 18: Infrastructure First
• Policy 23: Health and Safety
• Other key NPF4 policy connections:
o Policy 13: Sustainable transport
o Policy 14: Design, quality and place
o Policy 15: Local living and 20-minute neighbourhoods
o Policy 16: Quality homes
o Policy 21: Play, recreation, and sport
Information required by the Act and NPF4 regarding the topic:
Section 15(5) requires local authorities to take into account the following
matters in its Local Development Plan (LDP) spatial strategy: section 15(5)
(cd)the health needs of the population of the district and the likely effects
of development and use of land on those health needs; (d) the
infrastructure of the district (including … health care facilities); and section
15(5)(e) how that infrastructure is used.
National Planning Framework 4 (NPF4) Policy 18: Infrastructure First
requires that Local Development Plans and delivery programmes should be
based on an integrated infrastructure first approach. Plans should: be
informed by evidence on infrastructure capacity, condition, needs and
deliverability within the plan area, including cross boundary infrastructure;
set out the infrastructure requirements to deliver the spatial strategy,
informed by the evidence base, identifying the infrastructure priorities,
and where, how, when and by whom they will be delivered; and indicate
the type, level (or method of calculation) and location of the financial or in-
kind contributions, and the types of development from which they will be
required.
NPF4 Policy 23: Health and Safety promotes and facilitates development
that improves health and wellbeing, and that development proposals
which are likely to have a significant adverse effect on health will not be
supported. LDP spatial strategies should seek to tackle health inequalities
particularly in places which are experiencing the most disadvantage.  They
should identify the health and social care services and infrastructure
needed in the area, including potential for co-location of complementary
services, in partnership with Health Boards and Health and Social Care
Partnerships. LDPs should create healthier places for example through
opportunities for exercise, healthier lifestyles, land for community food
growing and allotments, and awareness of locations of concern for suicide.
The nature of this topic also links with several other NPF4 policies across
the key objectives of NPF4; sustainable places, where we reduce
emissions, restore and better connect biodiversity; liveable places, where
we can all live better, healthier lives; and productive places, where we
have a greener, fairer and more inclusive wellbeing economy.
The Scottish Government’s Infrastructure Investment Hierarchy is
promoted in National Planning Framework 4 (NPF4), it prioritises
enhancing and maintaining existing assets, then repurposing and co-
location of assets, then new-build assets. 
Planning for healthcare infrastructure in Perth and Kinross is essential for
accommodating existing residents and future residents in the area. The
appropriate infrastructure must be capable of supporting new housing
development and local population changes and contribute positively to the
health and wellbeing of communities.

Page 28

The LDP3 Proposed Plan will therefore take forward an evidence-based
understanding of the infrastructure of the area and the requirements
needed to support development, aligning with national, regional and local
strategies.

Page 29

Links to Evidence:
• Public Health Scotland
o  Strategic Plan 2022-25
o General Practice In-hours Activity Visualisation (2024) 
o Health Impact Assessment guidance
o NHS Dental data monitoring (2024)
• NHS Inform
o Pharmacy service directory
o Dental service directory
• NHS Scotland
o North Regions Regional Asset Management Plan 2019-2029
• NHS Tayside 
o Director of Public Health Annual Report 2023
o Annual Audit Report 2023/24 (Audit Scotland)
o Anchor Strategy 2023
o NHS Tayside new dental patients list
• Perth and Kinross Health and Social Care Partnership
o Integration Joint Board Strategic Commissioning Plan 2020-
25
o Joint Strategic Needs Assessment 2023
o Primary Care Premises Strategy 2023-2028 
o Strategic Delivery Plan 2023-2026
o Perth and Kinross General Practice lists [Core doc ref: CD33]
• Perth and Kinross Community Planning Partnership 
o Community Plan (LOIP) 2022-2032

Page 30

Summary of Evidence:
The health needs of the population of the district 
Health agencies vision and strategy
Perth and Kinross Council is located within the NHS Tayside health board
area.
Audit Scotland’s NHS Tayside Annual Audit Report (2023/24) finds:
“Public sector bodies must have a clear vision and strategy and set
priorities for improvement within this vision and strategy. They work
together with partners and communities to improve outcomes and foster a
culture of innovation. NHS Tayside does not currently have a long-term
strategic plan to support the delivery of its vision but intends to publish its
strategy by March 2025.”
NHS Tayside has developed an Anchor Strategy which supports the
delivery plan and sets out ways that it can use its position to address
health inequalities and provide a positive contribution to the local area.
Anchor institutions are “large organisations whose long-term sustainability
is tied to the wellbeing of the populations they serve”, and include
organisations such as NHS Boards, local authorities, educational
institutions, local housing associations, and emergency services. 
The Anchor Strategy shares the finding, from studies by The Health
Foundation, which prove that “80% of health outcomes are determined by
non-health related inputs, for example education, employment, income,
housing and access to green space ... Anchor institutions can address the
social determinants of health and in doing so, reduce inequalities in society
and transform the lives of people in the communities around them”.
The Perth and Kinross Health and Social Care Partnership’s (PKHSCP)
vision, as set out in the Strategic Commissioning plan 2020-2025 is:
“Our vision as a Health and Social Care Partnership is to work together to
support people living in Perth and Kinross to lead healthy and active lives
and to live as independently as possible, with choice and control over their
care and support. Our aim is to improve the wellbeing and outcomes of
people living in Perth and Kinross, to intervene early and to work with the
third and independent sectors and communities, to prevent longer-term
issues arising. 
The services and support we offer people will be developed locally, in
partnership with communities, the third and independent sectors. As a
partnership we will be integrated from the point of view of individuals,
families and communities and responsive to the particular needs of
individuals and families in our different localities. We will make the best
use of available facilities, people and resources ensuring we maintain
quality and safety standards as the highest priority.”
In line with the requirements of the Tayside Health Equities Programme
the PKHSCP is also committed to ensuring:
• target health improvement programmes towards people in greatest
need, particularly towards most deprived communities;
• target health and other services in the same way;
• develop ‘asset-based’ and ‘co-production’ approaches in
partnership with the communities of Tayside;
• develop preventative and early intervention approaches for all. 
Local needs

Page 31

Using data on the health of the local population, the Perth and Kinross
Integration Joint Board Strategic Commissioning Plan 2020-2025 Strategic
Needs Assessment has enabled local population profiles to be developed,
and these highlight the following key messages and challenges: 
• Life expectancy is lower in the most deprived areas, primarily Perth
City. 
• An increase in the over 85-year-old age group and with increasingly
complex needs is expected. 
• There is a growing population of older people in North Perthshire.
• 31.5% population are access deprived due to the rural nature of Perth
and Kinross. 
• Approximately 30% of people are living with long-term conditions and
this is associated with age and income deprivation. 
• Poor mental health affects more people in deprived areas. 
• Uptake of support from the Drugs and Alcohol Team is greater in Perth
City than in either the North or South Perthshire Localities.
• There is a growing ageing population of people with learning
disabilities.
• The last census stated that 13,000 people identified themselves as
unpaid Carers but it is known that this number is higher and the
significant contribution that Carers make to lives of those they care for. 
NHS Tayside also highlighted in their statement of agreement: “in line with
the draft Perth and Kinross Community Health and Wellbeing Strategy, the
needs of the growing obesity and overweight population in Perth and
Kinross, and the associated preventative/ adjustment measures required
for those needs. 
The Strategic Commissioning Plan also acknowledges the pressures of
funding:
“The Partnership has a £4.1m budget deficit in 2019/20 with a further gap
projected over the following two years. How we provide services, and the
cost of these services are directly linked. We cannot provide services in the
way we have before - we don’t have enough money to do so. With growing
demand for support and less money available we want to work with
individuals and neighbourhoods to find ways to better support people in
our communities: 
• We want people to have better health and wellbeing. 
• We want people to live as independently as possible. 
• We will prioritise our services and we will involve communities in
this process. 
• We will need to find new solutions - we will not always be the first
source of support.” 
The Joint Strategic Needs Assessment (2023) highlights local strategies
policies:
“…There is also a strong focus on prevention, early intervention and
integrated working to support people to live independently at home, and –
if they are unwell – to treat them as close to home as possible in nonacute
settings where this is appropriate. People are supported to remain active in
their communities, taking part in activities that interest them and retaining
and strengthening their social connections…”
NHS Tayside highlights the need to maintain links with stakeholders in all
development proposals to embed a preventative approach, ensuring that
developments meet local needs”, also reflected in NPF4 Policy 23.

Page 32

Strategies by health authorities are clear in their focus on ‘prevention’ and
‘preventative measures’ for supporting population health and wellbeing.

Page 33

Likely effects of development and use of land on those health needs
The Perth & Kinross Health & Social Care Partnership Primary Care
Premises Strategy 2023-2028 sets out information on General Practice
capacity in the area. The number of General Practices (GP) in Scotland is
decreasing, reflected locally in Perth and Kinross with facilities closing in
the past five years (two branch surgeries; Blair Atholl and Methven).  The
main surgeries for each branch continue to provide GMS for the patients
and therefore dispersal of patients to other practices is not required.
The Strategy finds that, based on the standard space expected to be
available per working clinician, Perth City currently has 10,000-12,000
more patients than it has space for. It finds that the additional 6,000-7,000
patients that will arise from the allocated development in and around
Perth City (referred to as the western expansion of Perth City) will “result
in an unsustainable additional burden on already stretched facilities”. 
Perth & Kinross GP Practice Premises Survey results (June 2022) are
summarised in Appendix B of the Primary Care Premises Strategy 2023-
2028. 18 of 23 practices in Perth and Kinross responded to an online
survey. 61% of respondents considered their premises to be fit for present
needs (39% said no).  The respondents that answered ‘no’ gave various
reasons including insufficient consulting space, issues around access and
patient flow, inability to house other services, reception & administration
areas too small or not available, health & safety risks, general building
fabric inadequacy, external works required e.g. roofing & car parking.
Population changes in Perth and Kinross, as well as demographic patterns
toward an ageing population will affect local health infrastructure needs.
However, explained earlier, around 80% of health outcomes are
determined by non-health outputs. This is illustrated by Fig 1, published in
the Integration Joint Board Strategic Delivery Plan (2024-2027).
“Prevention” is therefore an important theme in strategies by local health
authorities in dealing with future healthcare needs. ‘Healthier’ places can
reduce the requirement for direct contact with healthcare services by
supporting to good physical and mental health. 
Fig 1: Health determinants

Page 34

The infrastructure of the district
Perth and Kinross is located within the NHS Tayside health board area. At
2019, NHS Tayside covers an area of 7,526 km2 and provides services to a
population of over 416,080, from an ownership of 15 hospitals, 36 health
centres and clinics, and 5 office buildings with a net book value of £485m.
GP surgeries
The Perth and Kinross Health & Social Care Partnership (HSCP) Primary
Care Premises Strategy 2023-2028 confirms there are 23 practices in Perth
and Kinross. These are grouped into five clusters, Fig 2 and Fig 3shows
maps of GP locations (Perth and Kinross-wide and Perth City). [Core doc
ref: CD33] sets out GP details including list sizes. 
Community Pharmacies
NHS Inform directory lists 36 pharmacies across Perth and Kinross. Fig 2
and Fig 3 shows the location of pharmacies (Perth and Kinross-wide and
Perth City).

Page 35

Fig 2: Locations of GP Practices and Pharmacies in Perth and Kinross

Page 36

Fig 3: Locations of GP Practices and Pharmacies in Perth City area

Page 37

Dentists
NHS Inform directory shows 27 dental practices offering general dentistry
and orthodontics in Perth and Kinross. Broxden dental hospital is located in
Perth, offering emergency NHS dental care.
Data from Public Health Scotland confirms the number of patients and
percentage of the population registered with an NHS dentist on the basis
of NHS board area, using 2021 mid-year population estimates. In Tayside,
at September 2024, 358,384 people in total (adults and children) were
registered, which is 85.8% of the population in the area. The average rate
for Scotland is 94.6%. 
Hospitals
Two hospitals are located within Perth and Kinross; Perth Royal Infirmary
and Murray Royal Hospital. There are also community hospitals located in
Pitlochry, Crieff, Auchterarder and Blairgowrie. Further afield within the
NHS Tayside area is Ninewells Hospital, which is located in the adjacent
Dundee City Council area, and Stracathro Hospital, located in Angus
Council. 
Health and Social Care Services
The services assigned to Perth and Kinross HSCP are set out in Fig 4. The
Tayside area has three Health and Social Care Partnerships (Perth and
Kinross, Dundee, and Angus) which are aligned to the three local authority
areas and report to their respective Integrated Joint Boards (IJB). Each IJB
is responsible for the strategic planning and delivery of services. These
services are delegated by the respective Council and NHS Tayside because
they are specific to that geographical area or are hosted by one IJB on
behalf of all, as they provide services across Tayside.

Page 38

Fig 4: Delegated Partnership Services for Tayside assigned to Perth and
Kinross HSCP

Page 39

How that infrastructure is used
Distribution of services
Public Bodies (Joint Working) (Scotland) Act 2014 stipulates that, to ensure
that community stakeholders have greater control over the planning and
provision of integrated health and social care services, each Health and
Social Care Partnership (HSCP) area should be divided into at least two
localities. The PKHSCP area is split into three localities: North Locality,
South Locality, and Perth City Locality (Fig 5).
The PKHSCP Strategic Commissioning Plan 2020-2025 advises that Locality
Action Plans are being developed to ensure that people have access to the
services and supports they need in their local communities.
The Plan also shares results of a survey undertaken in 2019, completed by
over 1,400 people, which sought views on local health and social care
services. The key findings were: 
• The majority of people indicated that they wished more activities to
be created for local people within their communities, particularly
involving exercise. 
• A high proportion of people highlighted that they found transport
an issue, particularly in rural areas and when accessing centralised
hospital care.
• Some respondents wanted better access to information about what
services were available in their local areas and they wished to know
who to contact to access these services. 
• Many people highlighted difficulties in accessing home care,
particularly in rural areas. 
• There was consensus that people wished to receive care within their
own homes or within their own communities.
•  The majority of respondents supported the need for people to
better look after their own health and wellbeing through diet and
exercise. 
The IJB’s Strategic Delivery Plan sets out how budget is allocated to
healthcare services in the area – Fig 6. With an ageing population prevalent
in Perth and Kinross it is likely that the proportion of budget required to
support this demographic will remain consistent, or increase.
Fig 6: budget allocation for Perth and Kinross health and social care
services

Page 40

Fig 5: Perth and Kinross HSCP service areas

Page 41

Capacity/ utilisation
Public Health Scotland publishes data on the number of encounters
recorded each month by General Practice teams, both clinical and non-
clinical. 94% of practices have been surveyed across Scotland since 2018.
Data for Perth and Kinross in the year January 2023 – January 2024
recorded 1,584,739 direct contact encounters with patients, equating to
4,341 per calendar day. Direct encounters are defined as being some form
of direct contact for clinical care between clinical staff and a patient e.g.
face to face or telephone consultations. 
The Scottish Health Planning Notes identify a floorspace requirement per
GP of 271sqm, with each GP capable of accommodating a maximum of
1,500 patients According to the PKHSCP Primary Care Premises Strategy,
since 2004 the average GP list size in Perth & Kinross has an established
growth of circa 0.8% per year. The Primary Care Premises Strategy
references practices being at, or over, capacity, however, data provided by
the PKHSCP confirms (Core doc ref: CD33) that all practices are accepting
new patients. 
For dental care, there are no geographic boundaries set by NHS Tayside on
registering at practices, which can result in difficulties predicting service
demands in an area. Waiting list data is not managed by the health board,
NHS Tayside, as this is managed by individual practices. NHS Tayside
publishes a list each month of practices accepting new NHS patients. At the
time of writing there were no practices listed within the Perth and Kinross
area. 
Impacts of housebuilding 
The Primary Care Premises Strategy does acknowledge the adopted Local
Development Plan and the housebuilding occurring in the area. The
Strategy also references Housing Land Audit data which, when combined
with estimated household sizes, is used to calculate population changes by
area. This demonstrates potential changes in practice list sizes, shown in
Fig 7.  The Strategy finds that the Perth City area currently has more
patients than it has space for, due to development allocated in the area. 
Effects of development in Crieff and Blairgowrie is also highlighted by
PKHSCP.
The Strategy explains that primary care services, traditionally provided by
GPs, are now undertaken by different staff within GP practices such as
physiotherapists, pharmacy teams, mental health nurses, social
prescribers, and advanced nurse practitioners. This requires space, but
many practices are operating with limited room for expansion.

Page 42

Fig 7: Estimated changes in GP list sizes as a result of housebuilding 
Primary Care Premises Strategy Possible Change in List Sizes

Page 43

Issues/ unmet needs
The Primary Care Premises Strategy highlights nine ‘priority areas’ to
improve primary care services.
1. Perth City / Bridge or Earn / Abernethy / Almond Valley GP
Practices
An appraisal of options for GP modelling and provision in the Perth
City area.  
2. Perth City Community Care & Treatment Service 
Closure of existing premises in Perth and relocation of service to
Drumhar, Perth (now complete).
3. The Carse, Errol 
HSCP requires project management from NHST for permanent
premises in the Carse of Gowrie area.
4. Lease Assignations/Liabilities/Property Ownership 
HSCP requires NHS Tayside to accelerate ongoing solutions for
premises issues, enabling HSCP to plan strategically for premises
longer-term.
5. Branch Surgeries 
Collaboration and engagement with practices regarding future
service provision for the branch surgery communities.
6. Opportunities for better value 
Potential premises redevelopment/ reconfiguration at Crieff and
Ardblair facilities.
7. Map PCIP Opportunities & Barriers 
Primary Care Improvement Plans are a national priority; barriers are
to be identified to support progress and agree funding with NHST. 
8. Assess potential improvements to premises 
Use the information from practices to prioritise and to link to
potential sources of funding and timeline of funding availability.
9. Premises Efficiency Review
Review operating costs for premises owned or leased by NHS
Tayside to assess where there is potential for efficiency savings.
The Strategy advises that changes in coverage of primary care services in
2022 affected some residents in the Abernethy area; around 1,200
patients. The Newburgh Practice (Fife health board) had a temporary
closure of their list to all new patients. New patients in Abernethy were
allocated to practices in Perth City, outwith typical catchment boundaries. 
Practice boundaries exist to allow practices to manage their patient lists
and suitable home visit responses can be provided, where necessary.
Where practices are required to extend their boundaries for individual
patient allocations this will result in potentially reducing GP availability for
existing patients and other workload implications.

Page 44

Summary of Implications for the Proposed Plan:
Tying in with National Planning Framework 4 (NPF4) and the Perth and
Kinross Council Corporate Plan, the Local Development Plan (LDP) will
work to tackle health inequalities through provision of infrastructure and
good placemaking.  Partnership working with relevant agencies will
therefore be important in the preparation of LDP3.
LDPs should create healthier places, for example through opportunities for
exercise, healthier lifestyles, land for community food growing and
allotments, and awareness of locations of concern for suicide.
Development proposals which are likely to have a significant adverse effect
on health will not be supported (NPF4 Policy 23). As ‘prevention’ is a key
priority of health authorities, the LDP3 spatial strategy will promote places
that contribute to good health and wellbeing.  A Health Impact Assessment
may be required to assess development proposals. Health Impact
Assessments are a practical way to systematically consider the potential,
and sometimes unintended, effects a policy, strategy or service plan may
have on the health of a population. Public Health Scotland has prepared
guidance to support practitioners undertaking Health Impact Assessments
Policy 18: Infrastructure First requires that LDPs should set out the
infrastructure requirements to deliver the spatial strategy, and where,
how, when and by whom they will be delivered. NPF4 Policy 23: Health and
Safety requires LDP spatial strategies to identify the health and social care
services and infrastructure needed in the area in partnership with Health
Boards and Health and Social Care Partnerships. Perth and Kinross Council
is working with the health authorities on the availability of evidence
required to embed future infrastructure needs into LDP3. 
The sources referenced in this report may be updated from time to time as
the most recent version of data and documents becomes available in the
preparation of LDP3. This report has been prepared in consultation with
health agencies NHS Tayside and Perth and Kinross Health and Social Care
Partnership, as well as the neighbouring planning authorities and HSCPs in
the Tayside health board area. 
Data on primary care services is largely available via the sources
referenced in this report, however, consultation during the preparation of
the report found some healthcare infrastructure data was not available. 
The PKHSCP Primary Care Premises Strategy highlights housebuilding in
certain areas (around the Perth City settlement, also Crieff and
Blairgowrie) as being a concern for infrastructure and service provision.
However, ‘RAG’ capacity data for GP premises is not presently available
from the health authorities and all practices are advised as routinely
accepting new patients.  Formal GP premises catchment boundary data is
also not available at present, which is needed to demonstrate patient
demand in an area, and calculate population changes within catchments or
clusters arising from developments. The data will be utilised once available
from the health authorities. 
Funding options for new healthcare infrastructure, to be identified by the
health authorities, will need to be carefully considered when preparing the
new spatial strategy for Perth and Kinross, including requirements of
developers (financial or in-kind). Healthcare infrastructure is not presently
included in the scope of the Council’s developer contributions policy.
The Council’s policy for developer contributions may be expanded to
include Healthcare infrastructure arising from new development (financial
or in-kind) where sufficient justification exists, per the test of Circular
3/2012. A methodology for this has not yet been developed and will
require joint-working with NHS Tayside and Perth and Kinross Health and
Social Care Partnership where a clear need is demonstrated as a result of
new development proposals. 
Detailed infrastructure requirements will be required from stakeholders
for site allocations in Local Development Plan 3, with particular focus on

Page 45

NPF4 Policy 18 Infrastructure First and Policy 23 Health and Safety
requirements.

Page 46

Gaps, Uncertainties or Key Issues Raised:
There was positive engagement with NHS Tayside and Perth and Kinross
Health and Social Care Partnership through the preparation of the
Evidence Report. However there remains some uncertainties regarding
healthcare premises capacity/ needs for Perth and Kinross. An example of
this is where the Primary Care Premises Strategy references GPs being at
or over capacity, however, data provided by the PKHSCP confirms (Core
doc ref: CD33) that all practices are accepting new patients. The PKHSCP
monitors GP lists, but space utilisation data is required from NHST, which is
not presently available, to determine capacity levels.  GPs are only one
example of healthcare service provision, and improved understanding of
healthcare infrastructure needs will be developed through working with
health authorities in the preparation of LDP3. 
Summary of Stakeholder Engagement:
The Council produced and consulted on a series of Topic Papers which
covered the individual subject matters of NPF4’s national planning policies
suite.  These papers set out in detail the evidence the Council has gathered
to help produce our Evidence Report, and which we hope to use to
prepare our LDP3 Proposed Plan. The papers were published on the
Council’s Consultation Hub for a 6-week period during July and August
2024.  As part of our consultation process for LDP3 Topic Papers we
welcomed the views of our key stakeholders (who were contacted
specifically via email regarding the consultation exercise) and the public at
large, on the sufficiency of the evidence gathered, our interpretation of the
implications of that evidence to the Proposed Plan, and on how we intend
to use that evidence to develop our LDP3.  We also asked respondents to
provide links to other sources of available information or data which they
felt we had not included, alongside an explanation of why they considered
any additional sources of information to be relevant to the preparation of
the Local Development Plan.
Through this process, there was engagement with the PKHSCP Primary
Care team to seek sources of information relating to healthcare premises.
The PKHSCP Primary Care team responded with comments on the Topic
Paper and signposted to HSCP sources. 
Planning Officers of Perth and Kinross Council met with NHS Tayside and
PKHSCP through the preparation of the Evidence Report, who provided
advice on the health board’s priorities and signposted to resources online.
Planning officers of Perth and Kinross Council chaired a cross-boundary
‘Tayside development planning’ meeting with representatives of NHS
Tayside, Dundee City Council and Angus Council Planning, and the
respective HSCPs present, to inform on the local development plan
preparation process and discuss the ‘scope’ and availability of evidence
required for healthcare infrastructure in the region. It was agreed that the
group would continue to meet periodically to sustain engagement through
the three planning authorities’ LDP processes.
Both PKHSCP and NHST have reviewed this section of the Evidence Report
and provided comments and suggested amendments before finalising. A
Statement of Agreement was provided by NHST. PKHSCP have agreed to

Page 47

the Evidence Report, subject to minor changes, and a Statement of
Agreement is awaited at the time of writing. 
Perth and Kinross Council is preparing a ‘Draft Protocol’ for formalising the
engagement between the health authorities and planning authorities in
the Tayside area. This agreement will set out consultation opportunities in
Development Management and Development Planning to ensure long-
term, sustainable collaboration. Preparation of the Protocol is to be
progressed through 2025, and it is anticipated that signatories will include
senior officers on behalf of: NHS Tayside, Perth and Kinross Council, Perth
and Kinross Health and Social Care Partnership, Dundee City Council,
Dundee Health and Social Care Partnership, Angus Council, and Angus
Health and Social Care Partnership.
Views on the Infrastructure of the Area
Under Part 2, Section 16B(3) and Section 15(5)(d) and (e) of the Planning
(Scotland) Act 2019, in the preparation of their Evidence Report, planning
authorities are required to provide their views on the infrastructure of the
plan area, and how that infrastructure is used.
There are ample sources of evidence relating to the local population and
the health needs in the area as well as the range of services delivered in
the area. 
Health agencies are prioritising an approach of ‘prevention’ for improving
public health in which the spatial strategy can align, together with Policy
requirements of NPF4. The availability of evidence relating to physical
healthcare infrastructure; including premises requirements and capacity in
the Tayside area is not complete and represents a ‘gap’ in the data when
considering potential implications of new development allocations in the
next Local Development Plan. Perth and Kinross Council will utilise data on
healthcare infrastructure as it becomes available.

Page 48

Statements of Agreement/ Dispute:
Respondent Agree or Dispute Summary of Comments PKC’s Response
Perth and Kinross
Health and Social
Care Partnership
[3 responses]
Neither agree nor
disagree 
List of Evidence/Datasets and Summary of Implications for
Proposed Plan (PP): Covered in further comments below 
Further Comments: 
Topic Paper 014 paragraph 5.4 is inaccurate as there are 23
practices in P&K not 28. The information seems to have come
from the link at NHS Inform. 3 of the 23 Practices have a branch
surgery but the branch is listed as practices.  Taymount and Scone
and Aberfeldy and Kinloch Rannoch have listed their branch
surgeries as practices. Bridgend which is part of St Margaret's is
listed as closed but is part time in its opening hours. Newburgh
had Abernethy as a branch but is a Fife practice. 
Noted - practices was taken from NHS
web source and information is updated
as advised.
Topic Paper 014 paragraph 5.2: "awareness of locations of
concern for suicide."  I wonder if other wording may be more
appropriate, but this is just my personal reflection. 
This is the wording taken from National
Planning Framework 4 page 76 and
glossary.
Minor Injury Unit in PRI: is this a Minor Injury Unit as it does not
only see injuries. 
Noted
Topic Paper 014 paragraph 5.24; Health impact assessment: what
defines significant adverse effect? 
This reference is taken from National
Planning Framework 4 Policy 23. 
Public Health Scotland Health Impact
Assessment guidance is included in the
list of data links within the topic paper.
Further information can be found in
‘Health Impact Assessment Guidance
for Practitioners’ under section 2.13:
Assessing Significance. ‘Significant’
impacts may be: potentially severe or

Page 49

Respondent Agree or Dispute Summary of Comments PKC’s Response
irreversible negative impacts, impacts
affecting a large number of people,
impacts affecting people who already
suffer poor health or are socially
excluded, positive impacts with
potential for greater health
improvement. 
The IJB approved a Primary Care Premises Strategy, accompanied
by an Equality and Fairness Impact Assessment, recently and the
implications of that do not appear in the topic paper from what I
can see. Please see the links below for these papers which would
be worth including in the evidence pack for consideration:
Primary Care Premises Strategy Cover paper
Primary Care Premises Strategy 2023-28
Equality and Fairness Impact Assessment for Premises Strategy
Additional sources are welcomed
The Integration Joint Board has recently approved a new Strategic
Plan for Health and Social Care please see via the link below. This
paper should be included as part of the evidence pack for LDP3
consideration. The IJB Strategic Plan is accompanied by a Joint
Strategic Needs Assessment (link below) which was conducted in
preparation for the drafting of the strategic plan. This provides
valuable information about the needs of the population and
hence would be a useful document for inclusion/consideration.
IJB Strategic Plan 24-27
Joint Strategic Needs Assessment 2023
The Joint Strategic Needs Assessment
is helpful for health of the population
Formal Dispute: 
No
- 
Homes for Scotland Disagree In relation to healthcare facilities, it is understood that there is no
methodology to determine the capacity for the number of
patients registered at a GP practice. It is also for the GP practice to
Agree –sources from PKHSCP and NHS
Tayside are referenced but highlights

Page 50

Respondent Agree or Dispute Summary of Comments PKC’s Response
determine how many clinicians are required to manage delivery of
General Medical Services based on the number of patients
registered with the practice. In support of local living and
maximising the use of existing assets it is likely that more detailed
analysis of local healthcare provision will be required than
detailed in the outputs of the Primary Care Premises Strategy
2023-2028. 
gaps when aligning this with the spatial
strategy
It is suggested that the following additional evidence is considered
by the Council: 
“Existing Housing Need in Perth and Kinross (2024)”, 
Homes for Scotland 
As with the census data the research contains evidence relating to
the health of residents in the Council area. 
Submitted to the Council by HFS on 16th April 2024. 
“Measuring Use of Health Services by Equality Group (2017)”, NHS
National Services Scotland
Examines the use of health services according to various
demographic groups.
https://www.nes.scot.nhs.uk/media/w13lu3n4/equality-
outcomes-and-mainstreaming-report.pdf 
“2018-based Population Projections by Council Area in Scotland
(2018)”
National Records for Scotland 
Assists Councils in forecasting for future use of services.
https://www.nrscotland.gov.uk/statistics-and-
data/statistics/statistics-by-theme/population/population-
projections/sub-national-population-projections/2018-based 
“NHS Scottish Public Health Observatory” 
To assist in profiling the local communities within the Council area 
Noted 
-

Page 51

Respondent Agree or Dispute Summary of Comments PKC’s Response
https://www.scotpho.org.uk/ 
Formal Dispute: No 
Earn Community
Council
Agree Topic Paper paragraph 3.2 “Policy 18 – Infrastructure First is also
relevant here; to encourage, promote and facilitate an
infrastructure first approach to land use planning, which puts
infrastructure considerations at the heart of placemaking” - not
only for Transport but also Education & Health. 
Health
-10-12000 more patients expected over the next decade (6-7k
from Western edge development) and this would make GP
services unsustainable in Perth.
- 2018 GMS Contract for GPs stated that over the next 25yrs GPs
would no longer be expected to provide a premises!!! 3 ways
ahead….
1. NHST accelerate lease assignations
2.GP leaders/HSCP & NHST to explore business containment cover
with insurers(?)
3.Leave market forces to resolve the issues.
It seems like they have chosen the latter!!!
Again if local democracy and 20min communities were
implemented as a model, then this would help build what is
needed.
Care /Health sector pay and increased training (as per new
Aberdeen Vet school) look like good options.
The idea of “Repurposing” buildings was part of the plan. This
would fit well with for Bridge of Earn - A new Primary school  and
the reuse of current building. 
Formal Dispute: No
Noted

Page 52

Respondent Agree or Dispute Summary of Comments PKC’s Response
Private Individual Disagree Once again the maps are unreadable on line 
The unabated development of Village communities put a strain on
GPs and other primary care services without indication that these
will be augmented. 
Formal Dispute: Yes
Reason: poor quality of graphics online
Noted regarding quality of images
published. 
The intention of the consultation for
the Topic Papers seeks agreement on
the range of evidence and data sources
to be used for LDP3 and does not seek
to set out the proposed spatial strategy
for LDP3. 
Further public consultation will be
undertaken through the plan
preparation process to gather views
from communities.

Page 53

1
Issue: Infrastructure – Transport (Including
Sustainable Transport)
Corresponding Perth and Kinross LDP3 Topic Paper: Topic Paper 014:
Infrastructure
Corresponding NPF4 Policy/Policies:
National Planning Framework 4 (NPF4) Policy 13: Sustainable Transport
aims to encourage, promote and facilitate developments that prioritise
walking, wheeling, cycling and public transport for everyday travel and
reduce the need to travel unsustainably. 
• Local Development Plans (LDPs) should prioritise locations for
future development that can be accessed by sustainable modes.
The spatial strategy should reflect the sustainable travel hierarchy
and sustainable investment hierarchy by making best use of existing
infrastructure and services. 
• LDPs should promote a place-based approach to consider how to
reduce car-dominance. This could include low traffic schemes,
shared transport options, designing–in speed controls, bus/cycle
priority, pedestrianisation and minimising space dedicated to car
parking. Consideration should be given to the type, mix and use of
development; local living and 20-minute neighbourhoods; car
ownership levels; the accessibility of proposals and allocations by
sustainable modes; and the accessibility for users of all abilities. 
• LDPs should be informed by an appropriate and effective transport
appraisal undertaken in line with relevant transport appraisal
guidance. Plans should be informed by evidence of the area’s
transport infrastructure capacity, and an appraisal of the spatial
strategy on the transport network. This should identify any
potential cumulative transport impacts and deliverable mitigation
proposed to inform the plan’s infrastructure first approach. Where
there is likely to be an impact on the trunk road or rail network,
early engagement with Transport Scotland is required.
NPF4 Policy 18: Infrastructure First is also relevant here; to encourage,
promote and facilitate an infrastructure first approach to land use
planning, which puts infrastructure considerations at the heart of
placemaking.
Information required by the Act and NPF4 regarding the topic:
Section 15(5) requires local authorities to take into account the following
matters in its local development plan spatial strategy: (d) the infrastructure
of the district (including transport systems), (e) how that infrastructure is
used.
The Town and Country Planning (Development Planning) (Scotland)
Regulations 2023: Regulation 9(2)(e) requires that “the planning authority
are to have regard to the following plans and strategies, insofar as relating
to the local development plan area …. (ii) Any regional transport strategy;
and (iii) Any local transport strategy”.

Page 54

2
Links to Evidence:
Strategies and Reports
• Scottish Government National Transport Strategy 2
• Transport Scotland Strategic Transport Projects Review 2
• Scottish Government Climate Change Plan update 2018-2032
• Transport Scotland route map to achieve a 20 per cent reduction in
car kilometres by 2030
• Tactran Achieving a 20% Reduction in Car-km: Options for the
Tractan Region
• Tactran Regional Transport Strategy documents
• Tactran Regional Active Travel Network
• Tayside Bus Alliance Bus Improvements Detailed Options Appraisal
• Transport Scotland Active Travel Vision
• Transport Scotland Active Travel Framework
• Transport Scotland Rail Services Decarbonisation Action Plan
• Scottish Government National Walking Strategy
• PKC Mobility Strategy main issues report 2023
• PKC Mobility Strategy
• PKC Mobility Strategy Action Plan
• PKC Kinross-shire Active Travel Masterplan
• Perth Traffic Appraisal Network Monitoring study [Core Doc Ref:
CD34]
• Electric Vehicle Infrastructure Fund Strategy and Expansion Plan
[Core Doc Ref: CD35]
• PKC Briefing to elected members January 2025 - Initial results of
Perth parking survey
• Scottish Household Survey - Transport and Travel in Scotland
(findings 2022)
• Scotland's Road Safety Framework to 2030
• Sustrans Walking and Cycling Index 2023
• Sustrans Hands Up Scotland Survey
Datasets
• Transport Scotland Scottish Transport Statistics 2023
• Scotland's Census 2022
•  Scottish Household Survey results
• UK Department for Transport road traffic statistics
• UK Department for Transport vehicle licensing statistics
• UK Department for Business, Energy & Industrial Strategy UK local
authority and regional greenhouse gas emissions statistics, 2005 to
2022
• Statista: UK working habits
Summary of Evidence:
This section analyses the collated evidence, aiming to outline the
availability of infrastructure, the performance of the different modes
within the transport network, and travel behaviour patterns within Perth
and Kinross. The relevance of this data to the Local Development Plan
(LDP) is also assessed. 
In addition to the data gathered in this section of the Evidence Report, the
Council will commission an adequate and proportionate Transport
Appraisal to inform the policy content of the new LDP. 
The approach to this section of the Evidence Report focuses on the
provision of evidence that is relevant to land use planning and the spatial

Page 55

3
strategy within the LDP. The description of baseline and identified issues
refer to those that should be considered in the development of the LDP.
Those elements of the transport network that fall outwith the remit of the
LDP are not shown in the Evidence Report. 
While every effort has been made to use the most up to date information,
some of the datasets used are now aged. Also, the majority of datasets
used are not bespoke to Perth and Kinross, and sometimes lack the
desirable level of detail to assess the existing infrastructure and usage
levels.
Evidence from public consultation exercises referring to transport topics is
shown in this document within the Summary of Stakeholder Engagement
section.
The findings from the analysis of transport evidence are linked to a variety
of themes, and relate to several NPF4 policies. Relevant items that can be
influenced by transport infrastructure are: 
• Policy 1: Tackling the Climate and Nature Crisis
• Policy 13: Sustainable Transport
• Polic 14: Design, Quality and Place
• Policy 15: Local Living and 20 Minute Neighbourhoods
• Policy 18: Infrastructure First
Analysis
Perth and Kinross is a local authority in East Scotland, extending from Loch
Leven and the Tay Estuary in the Lowlands to the boundaries of the
Cairngorms National Park to the North and Loch Lomond and Trossachs
National Park to the North West. It has an estimated population of 151,120
(National Record Scotland Mid 2022 Estimate), with the city of Perth as a
main settlement and a series of small towns distributed mostly to the
south of the territory. These include Blairgowrie and Rattray, Crieff,
Auchterarder, Kinross and Scone. While these settlements offer facilities,
employment and services to its residents, the majority of the local
authority is rural in nature, with a combination of accessible and remote
rural areas. 
The map below shows the distribution of urban and rural spaces in Perth
and Kinross, using the Scottish Government’s Urban/Rural classification for
2020. It outlines the predominance of remote rural areas in the northern
half of the territory, with the population concentrated in the city of Perth
and several small towns to the south.

Page 56

4

Page 57

5
Policy context
National
National Transport Strategy 2 (NTS2)
Transport policy is shaped by Transport Scotland’s National Transport
Strategy 2 (NTS2). This sets out the priorities that the Scottish Government
has for transport across the country. The document identifies some of the
existing issues affecting specific modes, and outlines opportunities to
deliver sustainable transport networks for better travel choices. 
NTS2 is informed by the Sustainable Travel Hierarchy. This model
prioritises walking, wheeling, cycling, public transport and shared options
as preferential options ahead of the private car. 
The strategy also highlights the role of the Sustainable Investment
Hierarchy to shape decision making. This approach supports transport
options that help reduce inequalities and the need to travel unsustainably.
It also prioritises the optimisation of existing assets and capacity over new
construction where possible.

Page 58

6 
NTS2 introduces its vision for the future of transport, where active travel
modes are combined with increased levels of public transport usage. This
vision also recognises the role that technologies and new ways of working
can have in reducing the need for travel. All these measures aim to reduce
the reliance on the private car, aided further by the transition to electric
vehicles. The diagram below illustrates the vision. 
The document sets out policies under four cross-cutting priorities, aiming
for a transport system that:
• Reduces inequalities
• Takes climate action
• Helps deliver inclusive economic growth
• Improves our health and wellbeing
These priorities are expected to be observed in subsequent transport
policies at national, regional and local levels.
Strategic Transport Projects Review 2 (STPR2)
STPR2 sets out the national vision for transport investment, with proposals
across all regions and addressing all modes. This second iteration started in
2019, and its operational principles are defined in accordance with the
priorities and outcomes outlined in NTS2.

Page 59

7
The review builds on the result of the review of the strategic transport
network’s performance. Taking into account the identified needs of
Scottish communities and the wider national objectives affecting the
transport system, the set of investments pursues three main outcomes:
• To make Scotland more accessible for residents, visitors and
businesses;
• To create better connection with sustainable, smart and cleaner
transport options; and
• To highlight the vital contribution that transport investment can
play in enabling and sustaining Scotland’s economic growth.
After a 12-week consultation exercise, STPR2 defined a total of 45
recommendations that target both infrastructure and behavioural change
interventions. These recommendations include nation-wide measures and
place-based projects. Those that are likely to create direct impact on the
transport network in Perth and Kinross are introduced below, with the
latest update as collated during engagement with Transport Scotland.
Nationwide recommendations
STPR2 includes a wide range of interventions that are expected to take
place, and to be supported, throughout Scotland. These nationwide
recommendations are designed to enable behaviour change to more
sustainable modes of transport, and to reduce carbon emissions across the
transport system. A breakdown is listed below:
• Improving active travel infrastructure
o 1. Connected neighbourhoods
o 3. Village-town active travel connections
o 4. Connecting towns by active travel
o 5. Long-distance active travel network
• Influencing travel choices and behaviour
o 6. Behavioural change initiatives
o 7. Changing road user behaviour
o 8. Increasing active travel to school
o 9. Improving access to bikes
o 10. Expansion of 20mph limits and zones
• Enhancing access to affordable public transport
o 19. Infrastructure to provide access for all at railway stations
o 20. Investment in Demand Responsive Transport and
Mobility as a Service
o 21. Improved public transport passenger interchange
facilities
o 22. Framework for the delivery of mobility hubs
o 23. Smart, integrated public transport ticketing
• Decarbonising transport
o 25. Decarbonisation of the rail network
o 26. Decarbonisation of the bus network
o 27. Behavioural change and modal shift for freight
o 28. Zero emission vehicles and infrastructure transition
• Increasing safety and resilience on the strategic transport network
o 30. Trunk road and motorway safety improvements to
progress towards ‘Vision Zero’
o 31. Trunk road and motorway climate change adaptation
and resilience
o 32. Trunk road and motorway renewal for reliability,
resilience and safety

Page 60

8
o 33. Future Intelligent Transport Systems
o 34. Traffic Scotland System renewal
o 35. Intelligent Transport System renewal and replacement
o 36. Strategy for improving rest and welfare facilities for
hauliers
o 37. Improving active travel on trunk roads through
communities
o 38. Speed Management Plan
Recommendation 15 – Highland Mainline rail corridor enhancements
Network Rail is continuing to develop plans for extensive track and
signalling renewals in the Perth Station area. These will be funded from
Network Rail’s renewals budget for Control Period 7 (2024-2029).
Recommendation 16 – Perth / Dundee / Aberdeen rail corridor
enhancements
The Aberdeen – Central Belt Service Improvements Project Outline
Business Case was accepted by Transport Scotland. Next steps are being
determined. Both the rail decarbonisation and Service Improvement
project works remain in development with the last mentioned works
concentred between Dundee and Aberdeen.
Recommendation 17 – Edinburgh / Glasgow – Perth / Dundee rail corridor
enhancements
In 2024 Network Rail completed works at Dunblane as part of an £11.2m
investment at Dunblane station that will improve train performance and
reliability on the wider Scottish Central Main Line route. The main element
of the works involved the installation of a new crossover that allows trains
to switch tracks. It means trains are now able to arrive and depart from
platform 3 towards Edinburgh and Glasgow, without having to leave the
station. Previously, due to there being no ‘turnback’ facility at the station,
trains arriving at platforms 2 and 3 had to continue north to use existing
crossovers in order to turn around and return to their station of origin - a
manoeuvre that took 13 minutes to complete.
In 2023 Network Rail completed a £6.8m programme of works at Barnhill
(near Perth) as part of the wider enhancements on the route. This involved
replacing a curved section of track at Barnhill, east of Perth station, with a
new single line and remodelling the junction. It has also allowed an
increase in line speed for trains from 20mph to 50mph in this location.
Rail decarbonisation plans remain in development. A contract has been
placed with National Grid for provision of a new Feeder Station to power
future electrification in Dundee.
Recommendation 43 – Rail station masterplans
Network Rail continues to develop a Perth Station Masterplan. Transport
Scotland and Network Rail met with Tactran and Perth and Kinross Council
at the start of August 2024. It was discussed it may be in the interests of
the Council to look at improvements they can make to connectivity in the
current arrangement.

Page 61

9
Other national transport policies
In its Climate Change Plan update 2018-2032, the Scottish Government
introduced a commitment to reduce car kilometres by 20% by 2030. In
response to this commitment, Transport Scotland published a Route Map
outlining interventions to enable this reduction. The document recognises
the need to establish individual and system-level changes to achieve the
desired move away from cars.
In the definition of opportunities for change, the document identifies high
levels of public support to reducing car use to protect the environment.
These opinions appear to be more prevalent in urban areas, with 70% of
people that drive in towns and cities agreeing it should be possible for
everyone to undertake their most frequent journeys without a car. This
response hints at the relation between density, travel distances and
transport infrastructure available. It appears more likely for individuals to
consider reducing their reliance on cars when facilities and services are
accessible via sustainable alternatives.
The document is framed around four desired behaviours to reduce car use: 
• Reduce the need to travel: use of online options that can remove
the need to travel
• Live well locally: providing robust networks of goods, services,
amenities and social connections within short distances
• Switching modes: for journeys that allow it, active travel and public
transport can provide better alternatives to the private car
• Combine or share car trips: if a sustainable alternative is not
available, users should consider sharing car trips
For the development of the LDP, these behaviours reinforce the
importance of local living principles and place-based approaches. The
design of well-served neighbourhoods can reduce the distances between
users and their needs and are expected to be supported by transport and
non-transport interventions. Additionally, the document clearly identifies
the importance of stable digital connectivity to support successful local
communities that can access opportunities and services without the need
to travel.
Regional
Regional Transport Strategy
After defining the key national transport policy elements, it is important to
outline how regional bodies contribute to the translation of those national
objectives into policies that support the local areas. These are set primarily
by Regional Transport Partnerships (RTPs). Perth and Kinross Council is a
member of Tactran, this is the RTP which covers the council areas for
Angus, Dundee, Stirling and Perth & Kinross.
In June 2024, partners within Tactran approved the adoption of the new
Tayside and Central Scotland Regional Transport Strategy 2024-2034 (RTS),
which will be referenced through the next stages of the Local Development
Plan. The Transport (Scotland) Act 2005 places a duty on Councils, Health
Boards and other public bodies to perform their functions consistent with
their respective Regional Transport Strategy. In accordance to this

Page 62

10
mandate, the content of the RTS will be incorporated into the next stages
of the Local Development Plan. 
The RTS seeks to identify the key issues local transport systems need to
support and provide the strategic policy framework for Tactran, and
partners’, plans and programmes; the strategic objectives, outcomes and
actions to focus activity on where it is most required, including a
monitoring and review framework to enable progress to be measured.
The RTS sets the regional backdrop for transport matters, encompassing
environmental and sustainability, social and demographic, and economic
factors. This is reflected in the four ‘strategic objectives’ of the strategy; to
take climate action, to improve health and wellbeing, to reduce
inequalities, and to help deliver inclusive and sustainable growth. These
objectives align with those introduced in NTS2, and are accompanied by a
series of key outcomes and targets to guide delivery partners and
encourage collaboration. The table below summarises the outcomes under
each of the strategic objectives, as set out in the RTS.
To take climate action
Reduce estimated CO2 emissions from transport in the region
- Increase the share of EV and low emission vehicle use
- Reduce freight mileage by road
- Reduce car kilometres driven
Ensure strategic and lifeline routes (and services) are resilient to climate
change, extreme weather and emergencies
To reduce inequalities
Improve ability for young people, and disadvantaged and rural
communities to access jobs, education and services
- Improve ability of 16-24 year olds to access jobs and further education
- Improve ability of all in the lowest SIMD data zones (all domains),
targeted by the respective Councils, to access jobs, education and
services
- Improve ability of families, targeted in local child poverty action plans,
to access jobs, education and services
- Improve ability of rural communities to access jobs, education and
services
- Improve the ability of over-65s, and those in lowest SIMD data zones
targeted by the respective Councils, to access social activities
Improve the ability of people with disabilities to access jobs, education
and services
Improve the safety and security of vulnerable and protected
characteristic groups in the street environment and on public transport
To improve health and wellbeing
Improve road safety for vulnerable users (pedestrians, cyclists, children
and older people, lower SIMD quintile)
Reduce transport emissions in declared air quality management areas
Improve access to healthcare
- Improve the ability of all in the lowest SIMD data zones (health
domain), targeted by the respective Councils, to access healthcare
- Improve the ability of rural communities to access healthcare
- Improve the ability of over-65s to access healthcare (primary
healthcare/hospitals)
Increase the share of personal trips made by sustainable modes such as
walking, wheeling, cycling and public transport

Page 63

11
Increase levels of physical activity
- Increase the levels of walking, wheeling and cycling in the lowest SIMD
data zones (health domain), targeted by the respective Councils
- Improve the ability to access active leisure facilities and green space for
lowest SIMD data zones
Reduce the impact of traffic on communities on strategic routes
To help deliver sustainable, inclusive economic growth
Reliable inter-regional and intra-regional journey times
- Improve public transport journey times, and journey time reliability on
strategic road and rail routes
- Improve journey time reliability for freight through the region, and to
key destinations in the region
Improved ability for young people, and disadvantaged and rural
communities to access jobs and education
- See outcomes to reduce inequalities above
The RTS builds a comprehensive background analysis, highlighting key
issues that impact the transport network as a whole, as well as a series of
wider societal concerns that could be targeted by successful transport
interventions.
For residents of Angus, Perth & Kinross and Stirling, whilst only 26%-29% of
personal trips are over 10km, these trips account for 81%-84% of the total
km driven. Air quality in Perth City and Crieff has also exceeded national air
quality thresholds. Tactran found that there is public support in the region
for combating climate change; 80% see climate change as an immediate
and urgent problem.
As well as an ageing population in Perth and Kinross, the area also has a
variety of transport needs associated with geographic locations. The RTS
finds that, in the Tactran territory, 63% of the population live in the urban
areas (Arbroath, Dundee, Forfar, Montrose, Perth and Stirling) and 37% of
the region live in rural areas. Further breakdown shows a 67.3% of people
in Perth & Kinross, 46.9% in Stirling and 38.4% in Angus live in rural areas. 
The RTS finds that most people who live in the region work in the region;
79.8% Tay Cities residents work in Tay Cities area. Commuting habits have
also been influenced by the Coronavirus pandemic, and the uptake of
home working and hybrid working styles. Less than a fifth of trips made by
residents are commuting trips. Approximately 20% of the jobs in the region
cannot be accessed within 60 minutes by public transport, by the working
age population. However, 68% of residents do not believe that the trip
they make to work or education can be carried out using public transport.
The RTS sets outcomes and targets for the strategic objectives set out.
Local strategies will be required to align with these. The RTS does note that
the identification of solutions and co-ordination of delivery must look
beyond local authority boundaries, and encourages regional partners to
continue to investigate ways of working together.
The Main Issues Report informing the RTS provided a suitable framework
for local authority members to engage in conversations regarding cross-
boundary issues. While the principles of the regional work are applicable
and embraced by each local authority, the RTP recognised the importance
of discussing how coordinated action at a regional level can increase the

Page 64

12
impact of any identified measures. During these early stages of
development of the strategy, PKC took part in conversations surrounding
several cross-boundary considerations:
• Regional travel demands: the definition of Travel To Work Areas
(TTWA) emphasises how travel patterns are rarely contained within
a single local authority area. For Perth and Kinross, there are several
factors to consider:
o The Tay Cities TTWA show considerable volumes of
movement of workers between Dundee, Angus, Perth and
Kinross and North-east Fife. 81% of all journeys starting in
Perth and Kinross end within the Tay Cities Region. This is
further accentuated by Dundee being the primary location
for the provision of health, leisure, retail and employment.
o Kinross-shire has strong links to Fife for health, leisure and
employment, including use of the Queen Margaret Hospital
in Dunfermline. The area is also located in the fringes of
Edinburgh TTWA, influencing movement patterns.
• The isolation of rural areas: the provision of public transport
services and the geographical distribution of facilities and services
create significant inequalities in rural areas. Public transport routes
are often designed around regional hubs such as Stirling, Perth or
Dundee, with key corridors accumulating the majority of services.
This reduces the availability of options to travel directly between
parts of Perth and Kinross, Stirling and Angus, which in turns
reduces access to employment opportunities, healthcare or retail.
• Cumulative impact of development across local authorities: local
authorities showed an awareness of the potential for large
developments to increase pressure on the transport network of
neighbouring authorities. While there is a good understanding of
the potential development taking place in the short term under the
current round of LDPs, establishing fluent communication to
understand any possible new developments in the region is key to
take the necessary steps to develop resilient transport systems.
Achieving a 20% Reduction in Car-km: Options for the Tractan Region
In response to the challenge introduced by the Scottish Government to
reduce car kilometres by 20% by 2030, Tactran commissioned a study to
identify interventions that can enable the region to meet this reduction
target. The report Achieving a 20% Reduction in Car-km: Options for the
Tactran Region highlights that, with the anticipated increase in car use
within the region, the real percentage of reduction to meet the national
target would be in the range of 27 to 30% by 2030 should no interventions
be brought forward.
The study assesses a wide range of interventions that could be delivered
through the collaboration between local, regional and national agencies.
The assessment draws two main conclusions:
• Locally-led action could deliver some reduction in car use by 2030,
with a best case scenario achieving an 8% decrease compared to
the 2019 baseline
• Further interventions, beyond the remit of regional transport
partners, would be necessary to meet the 20% reduction target
Those wider options to reduce car use include distance-based road pricing;
the rationing of car use; increases to fuel duty; and increases to Vehicle

Page 65

13
Excise Duty. Of these four, only distance-based road pricing might have the
potential to deliver sufficient level of reduction in car-km, in addition to
being the only option that appears implementable.
Local
The Perth and Kinross Council's Mobility Strategy, approved in 2024, sets
out Perth & Kinross Council's vision for managing and developing the
transport network. The Mobility Strategy includes all modes of transport,
for the movement of goods and people, across Perth & Kinross's rural and
urban settings, to help achieve national targets and local objectives. It
responds to the climate change agenda and changes in how people travel.
The strategic objectives of the Mobility Strategy align with key objectives
set out in the National Transport Strategy (NTS2): to take climate action; to
improve health and wellbeing; to reduce inequalities; and to help deliver
inclusive and sustainable growth. These priorities are further developed
and adapted to Perth and Kinross as the following 11 Transport Planning
Objectives (TPOs).
TPO1 To improve the affordability of transport options across Perth
and Kinross for all
TPO2 To improve the ability of rural communities and communities
with protected characteristics to access jobs, education and
services
TPO3 To reduce CO2 emissions produced by transport across Perth
and Kinross, by reducing car kilometres, decarbonising
motorised transport and increasing the share of everyday
journeys of people and goods by sustainable and active travel
modes
TPO4 To improve climate resilience across Perth and Kinross’s
transport network by reducing the impacts caused by extreme
weather events
TPO5 To support economic growth by improving the reliability and
efficiency of Perth and Kinross’s transport network
TPO6 To support local development that encourages and facilitates
local living and sustainable access, across Perth and Kinross, by
achieving an increased active travel and public transport mode
split to and from new developments
TPO7 To improve the capacity and reliability of alternative sustainable
freight and logistic modes across Perth and Kinross
TPO8 To improve labour market access through sustainable transport,
active travel, and digital opportunities, to and from Perth and
Kinross
TPO9 To improve road safety and perceived safety for all transport
users across Perth and Kinross

Page 66

14
TPO10 To improve physical; and mental health within Perth and
Kinross through walking, wheeling and cycling
TPO11 To improve air quality across Perth and Kinross’s road network
by achieving revocation of both Air Quality Management Areas
and reducing preventable pollutants
The Mobility Strategy Action Plan has been developed to support the
objectives outlined on the main strategy report which considers actions
relating to the transport system (physical mobility) as well as the land-use
system (spatial proximity) and the telecommunications system (digital
connectivity) which together constitutes a ‘Triple Access System’. 
The Action Plan includes the assessment of a long list of actions, with 234
options that were appraised against: 
PKC’s Transport Planning Objectives;
STAG Criteria;
National, regional and local policy objectives; and
Feasibility, affordability and public acceptability considerations.
After this appraisal, the final list of actions was defined, including 167
actions grouped into eight ‘themes’. Illustration below shows how the final
list of actions is distributed by theme and feasible delivery timeline. 
The confirmation of these actions, and the potential timeline for their
delivery, create a useful framework for the next stages of the Local
Development Plan. Understanding where PKC is likely to introduce
improvements to infrastructure and services will support decision making
in the definition of land use allocations that do not create excessive
pressure on the local and strategic transport network.
The adopted LDP and transport infrastructure
The current version of the LDP for Perth and Kinross is LDP2. Adopted in
2019, it included several items connected to the delivery or use of
transport infrastructure. 
Policies within the Plan were designed to account for the need of new
development to contribute to the necessary improvements to existing
infrastructure. Policy 60A Existing Infrastructure was defined according to
the content of Strategy Map 5, where LDP2 introduced important existing

Page 67

15
infrastructure and planned infrastructure investment. These projects
included some nationally significant improvements such as the dualling of
the A9 to the north of Perth City, as well as some local and regional needs
such as junction improvements and Park & Ride sites.
This objective of supporting existing infrastructure is considered to have
been partially met. There has been significant progress with some of the
improvements identified, such as rail station improvements and Park &
Ride sites. However, there has been less progress with junction
improvements and dualling of the A9.
The impact of LDP2 can also be analysed from the perspective of defining
the need for those key infrastructure projects. The latest version of the
LDP Delivery Programme, published in 2024, illustrates how major
development sites outlined in LDP2 have influenced the design and
construction of key transport links. 
The Perth Transport Futures Project is the most important transport
infrastructure project in the region. Its design corresponds with the main
developments taking place in and around Perth City, including Bertha Park,
Huntingtower, Almond Valley, Scone North and Perth West. These
developments are at different stages, with some already approaching
completion and others under construction. 
Phase 1 of the project was coordinated by Perth and Kinross Council and
completed in 2019. It delivered junction improvements between the A9
and A85 Crieff Road to relieve traffic congestion and facilitate
development to the west and north-west of Perth. Being now operational,
it provides a necessary increase in capacity for developments that are
under development or with an allocated site, such as Bertha Park, Almond
Valley, Huntingtower and Perth West.
Phases 2 and 3 are currently under construction, with the Cross Tay Link
Road (phase 2) approaching its opening date. Both phases will build on
those capacity and safety improvements, completing the link between the
A9 and M90 at Broxden and Inveralmond roundabouts with Scone. This
link will support not only congestion issues identified in the city centre, but
also accommodate predicted growth related to the major housing
development taking place at Scone North.
It is important to highlight that some of those sites are still to reach the
construction stages. LDP3 will aim to identify the likely phasing of
development for all major sites to understand, via transport appraisal, how
these rates of delivery are likely to impact the strategic road network.
Special attention will be given to sensitive points of the network, such as
Broxden and Inveralmond roundabouts, the A9 in its approaches to larger
settlements and the A85 to Crieff.
Modal assessment
Road transport
Road infrastructure and car usage
The territory of Perth and Kinross count with a total of 2,785km of roads.
This network is formed by the following road categories:

Page 68

16
- 270km trunk roads
o 53km trunk motorway (inc. slips) (1.9%)
o 217km trunk A roads (7.8%)
- 2,515km local authority roads
o 436km A roads (15.7%)
o 369km B roads (13.2%)
o 639km C roads (22.9%)
o 1,071km unclassified (38.5%)
The majority of main settlements within Perth and Kinross are served by
the Trunk Road Network. The A9 connects Perth to Glasgow to the South
West, passing through Auchterarder, and Inverness to the North, skirting a
series of small settlements such as Luncarty, Bankfoot, Dunkeld and
Pitlochry. The A85 is the main link between Perth and Crieff to the West,
and serves other settlements including Methven and Comrie. 
The M90 travels North to South between Perth and Edinburgh, and it
serves the town of Kinross as well as the settlements of Bridge of Earn,
Glenfarg and Milnathort. The A90 connects Perth to the Carse of Gowrie
and Dundee to the East, passing near the settlements of St. Madoes,
Inchture and Invergowrie. 
Some areas within Perth and Kinross are served by routes of strategic
importance that are not part of the Trunk Road Network. This is the case of
the A93 and A94, connecting Perth to settlements to the North-East
including Blairgowrie and Rattray, Scone, Coupar Angus and Alyth. Further
West, the A827 connects the A9 with Aberfeldy and other settlements
near Loch Tay. 
Being primarily rural in nature, Perth and Kinross registers relatively high
levels of reliance on the private vehicle. The following chart shows the
evolution in the number of vehicles registered in Perth and Kinross, using
data from the UK Government Vehicle Licensing Statistics (table veh0105). 
Chart below uses data from Scotland’s Census 2022 (table UV405) to show
an 18.9% of households in Perth and Kinross do not have access to a car or
van. This figure is lower than the national average at 26.4% and can be
expected in a council with predominantly rural areas. The graphic also
includes a comparison between urban areas, represented by the city of
Perth, and rural settlements across the local authority, illustrating the
differences in car or van availability to households.
75,000
80,000
85,000
90,000
95,000
100,000
2012
Q2
2013
Q2
2014
Q2
2015
Q2
2016
Q2
2017
Q2
2018
Q2
2019
Q2
2020
Q2
2021
Q2
2022
Q2
2023
Q2
2024
Q2

Page 69

17 
Condition of the road network
Chapter 4 of the Scottish Transport Statistics dataset provides a summary
of road condition for local authority networks. It uses data from the
Scottish Road Maintenance Condition Survey. The methodology shows the
percentage of different road types that are marked as red or amber
condition. Red means the road has deteriorated to the point at which it is
likely repairs to prolong its future life should be undertaken; while orange
signifies further investigation should be undertaken to establish if
treatment is required.
Table below shows the latest figures (2022-23) for Perth and Kinross,
compared to some neighbouring local authorities and the national
average. 
Perth
and
Kinross
Angus Stirling Fife Scotland
A Roads
Red 7 3 4 5 4
Amber 28 23 26 25 23
B Roads
Red 3 5 6 5 5
Amber 27 30 32 28 27
C roads
Red 3 4 8 3 6
Amber 26 24 32  25 27
Unclassified
Red 4 5 12 5 7
Amber 26 27 33 28 29
All roads
Red 4 5 9 5 6
Amber 27 26 31 27 27
The data in table above shows that, while there is a significant number of
road sections in Perth and Kinross that require monitoring and
maintenance, these are consistent with the overall condition of the road
network across other parts of Scotland. When assessing specific road types
and their condition, data shows that B, C and unclassified roads are in
relatively good estate of repair. However, the percentage of A roads
18.9
26.4
30.9
20.4
21.8
16.5
43.2
43.1
44.8
50.4
50.0
44.4
37.9
30.5
24.3
29.2
28.2
39.1
0 20 40 60 80 100
Perth and Kinross
Scotland
Perth
Aberfeldy
Pitlochry
Comrie
No car / van available 1 car / van available Multiple cars / vans available

Page 70

18
marked as red is considerably higher than that seen in other local
authorities, and in Scotland as a whole.
At present, Perth and Kinross has not collated internal data on the
condition of the local road network. This could provide more granular
information to inform future development and understand infrastructure
upgrades that might be necessary.
Performance of the road network
In order to understand how traffic levels have evolved in recent years, we
have analysed Annual Average Daily Traffic Flow (AADF) figures captured
by permanent counts. These are available at the Department for Transport
(DfT) road traffic statistics. A total of 136 counts installed in Perth and
Kinross have been assessed, included 35 on trunk roads and 101 on the
rest of the local road network. 
Maps below describe changes in AADF on the trunk road network in Perth
and Kinross between 2018 and 2023. This 5-year period has been chosen
to minimise the abnormalities that road traffic volumes experienced during
the COVID19 pandemic. 
The traffic data captured by permanent counts on the trunk road across
Perth and Kinross shows that, for the majority of locations (21 out of 35),
flows have registered variations of under 10%. This is the case in counters
along the M90 and A90 running south and east from Perth, and the A9
towards Stirling to the west. 
6 locations show traffic reductions of more than 10%. Most of these are
located in the outskirts of Perth, and sections of the A9 travelling north
towards the Highlands. Lastly, 8 locations registered increases in traffic
flows of more than 10%. The majority of these counters are located in the
A9 near Perth, and in the vicinity of Dunkeld and Pitlochry to the north.

Page 71

19 
Maps below present a similar description of traffic behaviour between
2018 and 2023 for counters installed on roads outwith the trunk network.  Of the 101 permanent counters included in the analysis of the local road
network, 72 registered variations (increase or decrease) in flow of under
10%. 19 locations show reductions in traffic volumes above 10%, with the
remainder 10 experiencing increases of over 10% in AADF between 2018
and 2023.

Page 72

20 
The Scottish Transport Statistics (chapter 5, table 5.5) database provides
another source of information to understand how traffic has evolved in
recent years. Their data computes vehicle kilometres across Perth and
Kinross, with information presented for trunk and local roads. Their data
illustrates how, prior to the COVID19 pandemic, overall volume of vehicles
on the road network was increasing. This was mostly associated with
consistent growth on the trunk road network, with local roads showing
slight decrease since 2017. 
Since the COVID19 pandemic, traffic flows have gradually recovered,
approaching the levels seen in 2018 and 2019. Table below shows a
summary of traffic levels, in million vehicle kilometres, between 2014 and
2022. 
2014 2015 2016 2017 2018 2019 2020 2021 2022
Trunk
roads
1,363 1,381 1,467 1,608 1,679 1,667 1,214 1,351 1,608
Local
roads
974 999 1,035 1,040 943 923 738 812 869
Total 2,337 2,380 2,502 2,648 2,622 2,590 1,952 2,163 2,477
The Scottish Transport Statistics also include datasets summarising delays
in road journeys. However, these do not produce information for Perth
and Kinross or the Tayside area. Instead, they provide overall figures for
the national road network, which can misrepresent the performance of the
road network in a territory dominated by rural areas such as Perth and
Kinross. The Scottish Household Survey does include information on
journey time delays by local authority. The figures for Perth and Kinross,
other local authorities within the Tactran region and the national average
between 2013 and 2022 (exc. 2020) are shown in chart below.

Page 73

21 
The information shown in the graph above point at a more reliable journey
time performance in Perth and Kinross when compared to the average for
Scotland and Dundee, but less so compared to Angus. These performance
figures are likely to be related to the nature of the road networks for each
local authority, with urban areas more likely to suffer from congestion
issues. The predominance of journeys on rural roads in Angus and in Perth
and Kinross contribute to more reliable journey time figures.
Cross Tay Link Road – Network Monitoring
In 2024, Perth and Kinross commissioned a Perth Traffic Appraisal Network
Monitoring study to compare traffic data in and around Perth City with
historic counts to provide a timeline of general traffic changes in Perth
leading up to the opening of the CTLR. Specifically, the report compares
the latest data output with the 2022 baseline that is currently applied to
the traffic model for the area. It also provides observations of how the
registered network performance compares to the 2023 future year model
used in the initial model appraisal for CTLR.
A total of 14 locations were surveyed, with overall results for total vehicles
showing a small reduction in total flow (0.6%) between 2022 and 2024.
When compared to 2015 (using data for 12 survey sites), traffic flows
decreased by 2.8%.
The analysis of traffic travelling into and out of Perth City reveals some
changes to commuting patterns. While the overall trends remain similar to
those seen in 2015, 2019 and 2022, AM and PM peaks associated with
commuter traffic are generally less prominent. The data also shows a
significant increase in traffic leaving the City Centre during the morning
peak. The study points at potential abnormal route design to avoid major
roadworks in key points of the network, but this point is not confirmed as
the cause for change.
The study concludes that, due to the small variation in flows compared to
2022 levels, there is no significant benefit to changing the model trip totals
for the 2022 baseline to create a 2024 scenario. The changes in hourly
distribution were also considered not to be significant enough to grant a
change in the model baseline.
At present, Perth and Kinross Council does not have other recent traffic
survey data beyond that included in the Perth City network study. It is
understood that road network capacity and flow studies this will be
0%
2%
4%
6%
8%
10%
12%
14%
16%
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Perth and Kinross Dundee Angus Scotland

Page 74

22
considered as part of the transport appraisal, and should help identify
sensitive locations across the local network.
Modelling for local and regional development
The previous version of the LDP for Perth and Kinross (LDP2) was informed
by a paramics traffic model with a range of scenarios developed to support
the LDP. The output of this micro-simulation traffic model was updated to
2022 base for Perth City, but no future year scenarios have been
developed.
Since then, Perth and Kinross has been involved in the development of a
more comprehensive model, acting as a local authority partner in the
commission of the Tay Cities Regional Transport Model (TCRTM). This
multi-modal strategic model was procured to support the development of
transport interventions and to inform land use planning and STPR2. It is
built on a 2017 base, with scenarios modelled until 2037. It interfaces with
the TELMoS14 / TMfs14 national modelling hierarchy to forecast changes
in population, jobs, and subsequent changes in levels of traffic over time. 
TCRTM explores six forecast scenarios, with 3 employment variants and
high and low travel demand levels. In addition to this, the model includes
two ‘without Policy’ forecasts for between 2025 and 2045.
With regards to land use developments, the model used those included in
the Assembly of Planning Policy 2018 (APPI2018) as collected by Transport
Scotland. Data for employment and residential development was fed into
TELMoS18, with output feeding into TCRTM and the resulting forecasts.
The model incorporated a series of committed interventions, including
some within Perth and Kinross. The list below shows a breakdown of those
schemes, with the year scenario that first considers them in parenthesis:
• Park & Ride sites (no new facilities in Perth and Kinross) 
• Road schemes
o Included in TMfS18
 A9 dualling
• Luncarty to pass of Birnam (2022)
• Killiecrankie to Glen Garry (2027)
• Pitlochry to Killiecrankie (2027)
 If Cross Tay Link Road is completed in 2024
• Tay Crossing to Ballinluig (2027)
• Pass of Birnam to Tay Crossing (2027)
o Not included in TMfS18
 A9 / A85 Junction Improvements (2022)
 Bertha Park Link Road through the A9 / CTLR (2027)
 Cross Tay Link Road (2027)
• Rail Public Transport interventions (all included in TMfS18)
o Dunblane / Perth – Glasgow (2022)
o Aberdeen / Glasgow (2022)
o Edinburgh – Aberdeen (2022)
o Inverness – Glasgow (2022)
o Inverness – Edinburgh (2022)
o Edinburgh (replaced with Glasgow) – Arbroath (2022)
With regards to land use developments, the model used those included in
the Assembly of Planning Policy 2018 (APPI2018) as collected by Transport

Page 75

23
Scotland. Employment and residential data was fed into TELMoS18, with
output feeding into TCRTM and the resulting forecasts.
The outputs of TCRTM are now part of the LATIS models retained by
Transport Scotland.
For LDP3, Perth and Kinross will engage with Transport Scotland and
Tactran to identify opportunities to deliver a cohesive suite of resources
that can interact with national traffic models and provide a robust
foundation for the transport appraisal.
Parking
At the moment of writing this chapter, there are two Controlled Parking
Zones (CPZs) in Perth and Kinross. The one in Perth covers the majority of
the city centre. On and off-street parking is divided in three zones with
different maximum stays. Zone 1 is limited to 1 hour to encourage
turnaround for people accessing businesses in the city centre. On the other
hand, zone 3 offers longer stays and more competitive rates, encouraging
drivers to park before entering the city centre.
There are a total of 17 council-controlled car parks in Perth city, with a
capacity of over 1,600 spaces. Rates and maximum stays for these car
parks depend on the zone they are located within. Map below shows the
boundaries of the three different parking zones within Perth, and the
location of council-controlled car parks. 
Residents of the city centre can apply to the yearly permit scheme. It is
divided in two zones with different yearly rates (£254 per year for the
inner zone and £145 for the outer zone).
There is a second CPZ in Crieff, covering the A85 High Street and a section
of Comrie Street, as well as some of the adjacent streets.
In January 2025, PKC began enforcing the national pavement parking ban.

Page 76

24
In order to mitigate the impact that road vehicle traffic has in urban areas,
PKC also supports Park & Ride sites at Broxden and Scone near Perth, and
at Kinross. These offer 400 and 126 spaces respectively, with bike lockers
and connections to public transport networks and active travel routes.
Perth City parking study
In 2024, PKC commissioned a series of occupancy and duration of stay
parking surveys in and around Perth City. The data extracted from these
surveys was then to be compared with similar surveys undertaken in
previous years.
The study, which is currently being reviewed and will be published in Q1
2025, found that the weekday maximum occupancy level in a typical week
is 56%, with similar levels for Saturday figures. These are noticeably lower
than the occupancy rates seen in 2017, with 66% and 67% for weekday and
Saturdays, respectively.
With regards to duration of stay, this new round of surveys show that 73%
of vehicles remain parked for less than 1 hour, increasing from 70% in
2017. The percentage of vehicles parked for over 4 hours remained
unchanged at 4%. The average duration of stay for the study area has
slightly increased, from 65 minutes in 2017 to 67 minutes in 2024.
The survey includes the analysis of specific locations that might be
impacted by significant developments within the city centre. Thimblerow
car park shows a peak weekday occupancy of 37%, with an 87% on
Saturdays. The weekday figures are significantly lower than those in
previous surveys. The car park at Perth Leisure Pool registered a 36% of
peak weekday occupancy, with a 46% on Saturday.
The study provides an assumed scenario where those two car parks are no
longer available due to redevelopment. In that case, and with unchanged
number of vehicles, maximum occupancy levels for weekdays and Saturday
rises to 61%.
Parking at railway stations
Additional parking capacity is available at railway stations throughout the
territory of the Council. These are operated by ScotRail, and offer an
opportunity for rail passengers to design multimodal journeys to reduce
car mileage. A summary of parking capacity for each of the rail stations in
Perth and Kinross, as well as a summary of charges when applicable, is
provided below.
Station Number of spaces
(accessible)
Parking charges
Perth 160 (7) £3.00 per day
Pitlochry 12 (2) £1.50 per day
Gleneagles 40 (2) N/A

Page 77

25
Dunkeld and Birnam 30 (-) N/A
Blair Atholl 6 (-) N/A
Invergowrie N/A N/A
Rannoch 6 (-) N/A
At the time of writing, Perth and Kinross Council did not have access to
occupancy or length of stay data for these station car parks. Network Rail
provided a high-level assessment of the occupancy levels during the direct
engagement with Perth and Kinross, as follows:
• Perth: moderate / busy
• Pitlochry: Busy
• Gleneagles: Busy
• Dunkeld and Birnam: Moderate
• Blair Atholl: Quiet
• Rannoch: N/A
An accurate summary of car parking occupancy and length of stay data for
railway stations would help the Council’s efforts to identify interventions
that optimise network performance and sustainable travel behaviour. In
the case of Perth station, a more detailed study could highlight whether
the provision of affordable long stay parking has an impact on driver’s
behaviour.
Perth Transport Futures project
PKC is undertaking an ambitious infrastructure upgrade programme,
aiming to enhance the performance of the local road network, improve
journey times and strengthen reliability. The rationale behind this
programme of major infrastructure work is that, by having a stronger
transport provision around Perth, the city can unlock opportunities for
economic growth while addressing congestion and pollution issues in
urban areas.
The project is divided in four stages:
• Phase 1: improvements to the A9 / A85 junction, with the provision
of a link to the Bertha Park development. Completed in 2019
• Phase 2: construction of the Cross Tay Link Road (CTLR). It includes
a bridge over the River Tay to connect the A9 north of Perth to the
A93 and A94 north of Scone. This phase is currently under
development, and expected to open in Spring 2025.
• Phase 3: construction of the Bertha Park Link Road, connecting the
sections delivered within phases 1 (A9/A85 junction) and 2 (CTLR).
This project travels through the Bertha Park development and
enhances connectivity to the north of the city. It is also under
construction at the time of writing this chapter, with a completion
date to be confirmed.
• Phase 4: delivery of a series of improvements under the Perth
Circulation Plan (PCP). These measures aim to capitalise on the

Page 78

26
opportunities created by phases 1 to 3, by improving traffic
management throughout the city centre to encourage the uptake of
sustainable travel options. This work will start with an updated
traffic model to understand the immediate impact of the different
construction schemes, with work expected to begin in Spring 2025.
While the infrastructure and list of interventions have not yet been
confirmed, improvements within the PCP may include:
o Parking and road space reallocation
o Traffic management arrangements
o Placemaking to optimise traffic flows and the space available
o Improvements to sustainable and active travel choices to
reduce congestion and local emissions
As part of the development of phase 4, PKC commissioned two
studies: the first will develop a short-term concept for Perth City’s
street use, aiming to capture the benefits of the CTLR opening in
2025. The second stage of the study develops a long-term concept
to reimagine the future use of each street in Perth City Centre, in
alignment with the 11 transport planning objectives within the
Mobility Strategy.
Mobility Hubs
In line with STPR2 recommendation 22, Perth and Kinross Council
recognises the potential of Mobility Hubs to optimise the use of transport
infrastructure and enable the growth of multimodal journeys. The
Council’s Mobility Strategy Action Plan includes a series of actions that are
to be developed through different timelines. These are listed below:
Action Description Timescale Indicative
cost
3 Design and deliver a ‘City Centre
Mobility Hub’ to provide an
integrated transport hub in Perth City
Medium High
4 Develop and deliver a ‘Strategic
Mobility Hub’ at Walnut Grove, to
provide local and strategic transport
links with integrated transport
choices
Short High
5 Develop and deliver a ‘Strategic
Mobility Hub’ at Bertha Park, to
provide local and strategic transport
links with integrated transport
choices
Short High
8 Explore options for local Mobility
Hubs within rural communities to
integrate modes across rural
neighbourhoods
Medium Low

Page 79

27
Road safety
Transport Scotland’s Reported Road Casualties 2022 analyses road safety
statistics across Scotland. For Perth and Kinross, the dataset shows that a
total of 157 collisions were reported, including 7 fatal accidents, with 70
and 80 causing serious and slight injuries, respectively. These figures are
part of a recent increase in collisions reported in the region. The following
chart shows the significant decrease in total collisions across Tayside, and
the recent spike in the number of occurrences in Perth and Kinross. 
The document also shows that a total of 229 road casualties were reported
within the territory of Perth and Kinross. These include figures for local and
trunk roads, and are composed of 8 fatalities, 85 seriously injured and 136
slightly injured. 19 of those total casualties were children, including all
severities. As seen with the collisions data, casualties show moderate
growth since 2020, after a long decreasing trend. 
Chart below shows the overall trend in recent years in Tayside, and the
recent increase in casualties registered in Perth and Kinross. 
In order to enable further reductions in collisions and casualties, Transport
Scotland published in February 2021 a Road Safety Framework to 2030.
This document recognises a variety of benefits associated with improved
levels of road safety, and a wide range of factors that can help achieve
these improvements. While the framework does not point directly at the
role of land use and infrastructure delivery as a direct influence on road
safety, it does recognise the role that local authorities have in influencing
vehicle speeds and enabling environments that are conducive of 
-
100
200
300
400
500
600
700
800
900
1979 1984 1989 1994 1999 2004 2009 2014 2019
Angus Dundee City Perth & Kinross
-
100
200
300
400
500
600
2009 2014 2019
Angus Dundee City Perth & Kinross

Page 80

28
sustainable and safe travel practices. These objectives are aligned with
some of the TPOs outlined in the Mobility Strategy, which will in turn
influence the next stages of LDP3.
Active travel
Perth and Kinross counts with a robust network of dedicated active travel
infrastructure. PKC is actively involved in the development of routes and
the support to initiatives that encourage the uptake of active travel modes.
A total of 2,042 km of core paths are currently adopted by PKC. These are
supported, promoted and maintained in collaboration with the Perth and
Kinross Countryside Trust and other local groups.
The National Cycle Network offers long distance routes that connect Perth
and Kinross with other parts of Scotland and beyond. These routes account
for over 200 km across the territory of the Council and include on-
carriageway and off-road sections. Routes 775 and 1 connect Perth with
Kinross and Edinburgh to the south; route 77 forms a corridor between
Dundee to the east and Dunkeld to the north; and route 7 runs past Loch
Tay and Aberfeldy before turning north towards Pitlochry, the Cairngorms
National Park and Inverness.
Map below shows the adopted core paths and routes included in the
National Cycle Network that run through the territory of Perth and Kinross. 
In recent years, PKC has undertaken a series of projects to enhance the
network of active travel infrastructure. The Traffic and Network Team are
developing Green Routes, where reduced speed limits on narrow country
roads aim to create a safer environment for people to cycle and walk in
rural areas.
The territory of the council also presents a regional network of cycle routes
or paths where cycling is encouraged across the local authority. These
include several well known locations for locals, including the Heritage Trail

Page 81

29
around Loch Leven, Provost Walk in Auchterarder, the River Tay Way and
the Perth Lade.
At the moment of writing this chapter, Perth and Kinross Council is also
carrying out consultation for the creation of Urban Trails in different areas
of the city of Perth. This is part of a wider regional project, delivered in
collaboration with Tactran under the People and Place Programme. These
trails aim to create an attractive option for residents and visitors to explore
the area by walking or cycling.
With the support of Sustrans, PKC have continued the development of
School Exclusion Zones, where vehicle access is restricted at peak times,
and pavements and paths are enhanced. These interventions have
targeted several schools across the local authority since the creation of the
scheme in 2016, with the following locations included:
- Burrelton Primary School
- Coupar Angus Primary School
- Arngask Primary School (Glenfarg)
- Luncarty Primary School
- Guildtown Primary School
- Inchview Primary School (Perth)
- Kinloch Rannoch Primary School
- Newhill Primary School (Blairgowrie)
- St Stephen Primary School (Blairgowrie)
- Viewlands Primary School (Perth)
- Fairview School (Perth)
- Perth Academy Secondary School
- Tulloch Primary School (Perth)
including Perth Academy, Perth High School, Tulloch Primary School and
Oakbank Primary School in Perth; and Robert Douglas Memorial School in
Scone; 
In addition to the development and management of active travel
infrastructure, PKC supports a series of initiatives to encourage higher
levels of uptake for active travel in the area. These interventions are
presented in the Perth and Kinross on the Go site, and include information
and guidance for individuals and businesses to embrace sustainable ways
to travel.
Sustrans has compiled the most recent assessment of the uptake of active
travel in Perth. The Walking and Cycling Index 2023 provides a
comprehensive picture of how the public at large and specific groups of
interest perceive active travel modes, and their decision making when
travelling in the city. 
Data from this report highlights a slight decrease in the mode share for
frequent walking, wheeling and cycling in Perth in recent years. While the
reduction in cycling is small (from 5% in 2021 to 4% in 2023 for people
cycling five or more days a week), walking and wheeling see significantly
lower percentages than before (from 57% to 52% of respondents walk or
wheel at least five days a week).

Page 82

30
Amongst a wide range of findings, the dataset points at a few reasons for
concern when it comes to the design and maintenance of active travel
opportunities. 23% of men cycle at least once a week, compared to only
9% of women. Also, while 80% of people aged 66 or over feel comfortable
walking, wheeling or spending time on the streets of their neighbourhood,
only 58% of people aged 16 to 25 feel the same way.
The report shows the high level of support that active travel receives from
the local population in Perth. Respondents consistently state a desire to
drive less and increase the amount of journeys by public transport,
walking, wheeling and cycling. 25% of residents want to drive less, yet 37%
often use a car because no other transport options are available. 
A follow up question confirms this support, with a majority of residents
considering public transport, walking and wheeling should receive more
government funding. Cycling was perceived slightly differently and is
trending downwards, with a reduction of 5 percentage points in the public
support for additional funding. Other concepts such as pavement parking
ban and creation of 20-minute neighbourhoods or low-traffic
neighbourhoods also received high levels of support during the project.
While the information included in the Walking and Cycling Index study
offers a comprehensive view of user behaviour regarding active travel, this
research is limited to Perth City. The Council does not hold that type of
information for other settlements, which would be beneficial to identify
deterrents and understand the impact of future interventions.
Tactran Regional Active Travel Network
Published in 2023, the Tactran Regional Active Travel Network assesses the
active travel network to identify opportunities to transform the facilities in
the region. The vision is to enable walking and cycling as a choice for
everyday journeys, while enhancing the quality of long-distance routes. In
order to achieve this, Tactran identifies the need for cross-boundary
coordination that delivers robust itineraries and consistent infrastructure.
The document aims to facilitate the delivery of high quality facilities that
connect to key locations and to public transport hubs, in order to reduce
the reliance on the private car.
Following an exhaustive series of infrastructure audits and extensive
stakeholder engagement with communities and interest groups, the
project identified a long list of routes considered of regional significance.
Once gaps are outlined, a prioritisation process pointed at those
interventions that could deliver positive change at a regional level,
enabling cross-boundary travel as well as supporting short journeys for
local communities. These options were then scored and divided into four
phases. While the study recommends for delivery to follow those phases, it
is also highlighted that l with a recommendation for the region to deliver
enhancements following that order.
The study assesses a total of 39 routes, with 21 located within the territory
of Perth and Kinross. These are listed below, including the phase they were
allocated to after the assessment:

Page 83

31
Phase 1
• P20 – Bridge of Earn – Abernethy 
• P13 – Bankfoot – Dunkeld
• P4 – Coupar Angus – Blairgowrie
• P3 – Alyth – Blairgowrie
• P11 – Killiecrankie – Pitagowan
Phase 2
• P10 – Pitlochry – Killiecrankie
• P2 – St Madoes – Inchture
• P18 – Forteviot – Auchterarder
• P21 – Abernethy – Newburgh
• P15 – Crieff – Comrie
Phase 3
• P14 – Stanley – Luncarty
• P9 – Logierait – Pitlochry
• P8 – Logierait – Dunkeld
• P7 – Aberfeldy – Logierait
• P19 – Auchterarder – Braco
• P17 – Broxden – Forteviot
• P5 – Blairgowrie – Craigie
Phase 4
• P16 – Methven – Almondbank
• P12 – Stanley – Bankfoot
• P1 – Walnut Grove – St Madoes
• P6 – Craigie – Dunkeld
Of the routes within the territory of the Council, P11 (Killiecrankie –
Pitagowan) runs across boundary and into the Cairngorms National Park.
Additionally, routes D3 (Inchture - Ninewells) and S1 (Braco – Dunblane)
are presented under Dundee and Stirling councils in the project, but run
partially through the territory of PKC.
While the project does not specify the likelihood of specific interventions
being funded or supported at a regional level, some of those routes are
already being explored by PKC or other bodies. Specifically, routes P20
(Bridge of Earn – Abernethy) and P21 (Abernethy – Newburgh) are
currently being delivered as the Bridge of Earn to Newburgh Active Travel
Route by the Perth and Kinross Countryside Trust.
Map below, taken from the Tactran Regional Active Travel Network
storymap, shows the routes included in the assessment, colour coded by
phase (Phase 1: purple; Phase 2: orange; Phase 3: green; Phase 4: blue).

Page 84

32 
Kinross-shire Active Travel Masterplan
In 2023, PKC commissioned an active travel study for Kinross, Milnathort
and other nearby settlements. The objective  of the Kinross-shire Active
Travel Masterplan was to assess the existing infrastructure network, and
identify interventions that can enhance the walking and cycling
environment in the region.
The measures included in the assessment fall under six key categories.
These are shown below together with some example of interventions.
Kinross-shire wide interventions
• Delivery of active travel mapping tool
• Safe routes to schools
• Speed limit reductions
• Improved wayfinding
• Cycle storage facilities
• Active travel promotion campaigns
• Improved maintenance
• Integrations of bikes and buses
Active travel routes
• High quality active travel routes
• Quiet streets
• Minor active travel improvements such as signage, road markings
or overall maintenance
Active travel junction / crossing improvements
• Improvements to existing junction and crossing facilities
• Identification of new crossing facilities
Placemaking / community active travel facilities
• Mobility hubs in locations such as Kinross, Glenfarg and Portmoak
• Placemaking improvements in Milnathort Town Centre
• Cycle storage facilities in Kinross High Street
• Footwalk repair along the Loch Leven Heritage Trail

Page 85

33
Travel behaviour change
Increase of user confidence through the provision of traffic-free
environments, specifically around the Loch Leven Heritage Trail
Parking and road network improvements
• Parking formalisation in key locations such as Milnathort and
Glenfarg
• Traffic calming measures through Cleish and Scotlandwell
• Road network improvements between Gairneybank and Crook of
Devon
Inverventions are assessed based on the following factors: 
• Alignment with project objectives
• Connectivity to key facilities
• Community engagement / level of support
• Land ownership
• Cost
• Funding
• Timescales
Based on those scores, interventions are prioritised and distributed in
phases. From that list of measures, the report outlines a series of quick
wins that can have a high impact across Kinross-shire and can be delivered
at a relatively low cost within a short timeframe. These interventions can
generate initial momentum to increase active travel trips across Kinross-
shire, and are listed below.
Existing crossing improvements on Stirling Road, New Road and South
Street in Milnathort
Existing crossing improvements at Station Road/ Junction Road junction
and Ochil View in Kinross
Existing crossing improvements in Glenfarg
Active travel minor improvements along Gallowhill Road in Kinross
Active travel junction / crossing improvements
Active travel minor improvements along Burns-Begg Street, Kirkgate and
Pier Road in Kinross
Footway widening through Cleish
New crossing facility along Springfield Road in Kinross
Relocate and improve existing crossing point on Springfield Road in
Kinross
Active travel minor improvements between Kinross junction and Kinross
Park and Ride

Page 86

34
New crossing facility between Milnathort and Mawcarse
Loch Leven Heritage Trail footwalk repair
New crossing facility in Gairneybank
New crossing facility to Carnbo community hall
Public transport
Bus
Bus services in Perth and Kinross are currently provided by private
enterprises. While Stagecoach provides the largest number of local and
regional services, there are several smaller companies that operate specific
routes and locations.
In addition to local bus routes, intercity services also operate within Perth
and Kinross. Companies including Scottish Citylink, Megabus, FlixBus and
Ember connect Perth to other Scottish cities such as Dundee, Edinburgh,
Glasgow, Stirling or Aberdeen. Ember operates a fully electric fleet and
offers an on-demand service to settlements along the route.
Map below shows local, regional and long distance bus routes operating in
the territory of the council. 
As illustrated above, Perth and Kinross counts with robust geographic
coverage from bus services. A majority of settlements have some form of
public transport available. However, it is unclear whether local
communities enjoy easy access to these services, with conveniently
located stops, and whether the frequency of bus routes is sufficient to
offer a suitable alternative to the private car. At the time of writing this
chapter, the Public Transport team is collating route and passenger data
for subsidised services, and is expected to provide a more accurate
understanding of the quality of the provision. However, operators appear
not to be sharing patronage or service data for commercial services. This
gap restricts the quality of the information collated, and hinders the ability

Page 87

35
of the Council to understand the effectiveness of the public transport
network.
There are several Community Transport initiatives across the territory of
Perth and Kinross. They operate independently and, while they count with
the assistance of the Council, the financial viability often depends on
patronage and other sources of funding.
In order to reinforce public transport accessibility, Perth and Kinross
Council operate one Demand Responsive Transport (DRT) service between
Kinloch Rannoch and Pitlochry. In January 2025, the expansion of the
service to include a link to Aberfeldy was confirmed.
Table below summarises data from the Scottish Household Survey on the
frequency of use for local bus services. These compare results for Perth
and Kinross with national averages for Scotland, and average mode share
figures for different categories of the rural-urban classification. 
Every
day /
almost
every
day
2 / 3
times
per
week
Once a
week
Once a
fortnight
/ once a
month
Not
used in
the
past
month
Perth and
Kinross 1% 6% 7% 19% 67%
Scotland 5.3% 9.5% 7.2% 14.8% 63.2%         
Large urban
areas
9% 16% 11% 18% 46%
Other urban 4% 8% 6% 13% 68%
Small accessible
towns 3% 7% 6% 15% 68%
Small remote
towns 1% 3% 3% 7% 86%
Accessible rural 3% 5% 3% 15% 74%
Remote rural 2% 2% 4% 9% 83%
Tayside Bus Alliance
As a member of Tactran, PKC is also part of the Tayside Bus Alliance. This
was established with the support of Transport Scotland and the Scottish
Government Bus Partnership Fund, and it aims to improve access and
deliver a safe and efficient bus network that:
• reduces environmental impacts;
• contributes to addressing the climate emergency; and
• positively supports access to opportunities.
The Alliance is formed by bus operators that serve the regional network;
the local authorities for Dundee, Perth and Kinross, Angus and Fife; and
passenger and public groups from two RTPs, Tactran and SEStran.
The group has undertaken an initial assessment of bus improvement
measures for the Tayside area. After a Case for Change and Preliminary
Options Appraisal, a Detailed Options Appraisal summary was produced.
This shows the assessment of 12 bus corridors across Tayside (4 in Perth
City, 6 in and around Dundee, and 2 in north Fife) against two packages of
measures:

Page 88

36
• package 1: bus priority measures (focused on improving journey
times)
o bus lanes
o review of location of bus stops
o priority for buses at signalled junctions
o bus-only streets
• package 2: supporting measures (wider improvements to enhance
attractiveness of bus travel)
o park & ride sites
o review of parking provision and pricing
o creation or improvement of transport hubs
o enhanced integration of public transport and active travel
o marketing campaigns
o improvements to ticketing options
o low or zero-emission buses
o improvements to routing, frequency and timetabling
Within each package, specific interventions were selected depending on
the location, according to the result of the preliminary appraisal. 
The results of the assessment for package 1 measures in Perth are as
follows:
Corridor Itinerary Summary of results
A Crieff Rd • Bus journeys are 2 minutes faster
in peak period
• Journey time variability is
reduced by 35%
• 21,700 more bus passenger
boardings
B A912 – Dunkeld Rd • Bus journeys are 1.3 minutes
faster in peak period
• Journey time variability is
reduced by 46%
• 53,800 more bus passenger
boardings
C A85 Dundee Rd • Bus journeys are 2 minutes faster
in peak period
• Journey time variability is
reduced by 32%
• 8,500 more bus passenger
boardings
D Perth City Centre • Journey time variability is
reduced by 3%
• 90,800 more bus passenger
boardings
At the time of writing this chapter, results for package 2 options had not
been made available.
The project is now progressing into the Strategic Business Case stage, and
will include engagement and consultation exercises.

Page 89

37
Rail
Perth and Kinross counts with a total of seven railway stations currently in
use. The route between Glasgow and Aberdeen serves Gleneagles, Perth
and Invergowrie, while the route to Inverness and the Highlands includes
stops at Perth, Dunkeld and Birnam, Pitlochry and Blair Atholl. Map below
illustrates the location of stations and the railway lines in operation, as
well as lines that are no longer in service. 
In addition to this infrastructure for passenger services, there is a
dedicated rail freight terminal at Blackford, near Auchterarder. This facility
was inaugurated in 2022 to support the activity of Highland Spring water
company. 6 weekly trains move 40% of the finished goods between the
factory and external warehouses, removing 8,000 heavy good vehicle
journeys and 3,000 tonnes of CO2 per year.
Representatives of Network Rail provided a breakdown of key
infrastructure improvements planned for stations within Perth and Kinross: 
• Pitlochry
o Platform heights to be brought to standard. Delivery 25/26
o Ramps to both platforms from Birnam Glen Rd. Designs
delivery 25/26
o Path upgrade from Birnam to station. Designs delivery 25/26
• Perth
o Master planning for station upgrade, including
improvements to active travel accessibility, to continue
during 25/26
With regards to freight facilities, Network Rail highlighted that they are
expecting an increase in rail freight traffic via Perth in the future. Aberdeen
and Inverness are seen as growth areas, and due to the restrictions that
the Forth and Tay Bridges suffer in gauge and weight, some of that freight
traffic is likely to run via Perth. In order to accommodate this, Network Rail
commented on the possibility of developing a freight loop in a portion of
land currently retained in Muirton Yard, to the north of Perth City. This
would allow the local network to absorb that increase in freight traffic
while mitigating the impact on passenger services. This project is just a
possibility at this stage, and there are no formal steps being taken to
progress it.

Page 90

38
In addition to these targeted improvements, STPR2 includes
recommendations with the potential to bring enhancements to the rail
network in Perth and Kinross. These recommendations are introduced in
pg. 8 and 9 of this paper, and are as follows:
• Recommendation 15: Highline mainline rail corridor enhancements
• Recommendation 16: Perth / Dundee / Aberdeen rail corridor
enhancements
• Recommendation 17: Edinburgh / Glasgow / Perth / Dundee rail
corridor enhancements
• Recommendation 43: Rail station masterplans
Table below shows volumes of passengers (entries and exits to stations)
between in the 2023/2024 year for locations within Perth and Kinross. This
data has been provided by Network Rail during direct engagement.
Station
Entries and Exits
2023/2024
Pandemic recovery
(23/24 vs 18/19)
Perth 812,220 65%
Pitlochry 125,486 100%
Gleneagles 95,588 123%
Dunkeld and Birnam 51,290 139%
Invergowrie 20,866 365%
Blair Atholl 15,126 72%
Rannoch 7,304 83%
Unsurprisingly, Perth station sees the largest number of yearly passengers.
In addition to having larger population figures, Perth is the station served
by the largest number of lines. These include services travelling north to
Inverness; east to Dundee on the way to Aberdeen; west to Stirling and
then Glasgow; and south through Fife and towards Edinburgh. However,
Perth is the station within Perth and Kinross that shows the lowest
percentage of patronage when compared to pre-pandemic levels.
Table below summarises data from the Scottish Household Survey on the
frequency of use for train services. These compare results for Perth and
Kinross with national averages for Scotland, and average mode share
figures for different categories of the rural-urban classification. 
Every
day /
almost
every
day
2 / 3
times
per
week
Once a
week
Once a
fortnight
/ once a
month
Not
used in
the
past
month
Perth and
Kinross 0% 1% 3% 17% 79%
Scotland 0.9% 3.0% 3.8% 16.3% 76.0%        
Large urban
areas 1% 4% 5% 18% 73%
Other urban 1% 3% 4% 19% 73%
Small
accessible
towns 0% 4% 4% 13% 78%
Small remote
towns 0% 0% 0% 5% 95%
Accessible rural 1% 1% 3% 19% 76%
Remote rural 0% 1% 3% 4% 91%

Page 91

39 
Travel time comparison
The table below utilises geographic access data from the Scottish Index of
Multiple Deprivation (SIMD) to illustrate differences in travel time for
people travelling by car and public transport (PT). It shows the average
figures for Perth and Kinross and data for individual localities. The data
highlights the differences in general access to services for areas across the
territory of the council, as well as the significant variation in the provision
of public transport services in relation to private vehicle. The colour scale
ranges from green for most desirable scenarios (short journey times and
lowest drive to public transport ratio) to red for the least desirable cases
(long journey times and high drive to public transport ratio).

Page 92

40 
Average drive time
to key services
(minutes)
Average public
transport time to
key services
(minutes)
Drive to public
transport ratio
Perth and Kinross 5.087 12.530 2.463
Powmill, Cleish and Scotlandwell 6.588 17.902 2.718
Kinross 2.633 7.249 2.753
Milnathort and Crook of Devon 4.842 12.249 2.530
Muthill, Greenloaning and Gleneagles 6.225 15.780 2.535
Auchterarder 2.545 6.229 2.448
Comrie, Gilmerton and St Fillans* 6.348 13.718 2.161
Crieff North 3.029 8.098 2.673
Crieff South 2.542 7.244 2.850
Aberuthven and Almondbank 6.740 17.130 2.542
Glenfarg, Dunning and Rhynd 7.882 20.650 2.620
Bridge of Earn and Abernethy 6.908 15.535 2.249
Moncrieffe and Friarton 4.217 11.368 2.696
Viewlands, Craigie and Welshill 2.788 7.436 2.667
Burghmuir and Oakbank 3.332 11.109 3.334
Western Edge 4.039 12.250 3.033
Letham 3.474 10.147 2.921
Hillyland, Tulloch and Inveralmond 4.602 12.755 2.772
North Muirton and Old Scone 3.842 10.854 2.825
Muirton 2.900 7.185 2.478
North Inch 2.761 6.289 2.278
Central and South Inch 3.581 5.464 1.526
Gannochy and Walnut Grove 5.803 11.304 1.948
Scone 4.787 6.995 1.461
Guildtown, Balbeggie and St Madoes 8.894 20.408 2.295
Errol and Inchture 8.204 20.003 2.438
Invergowrie, Longforgan and Abernyte 5.675 16.910 2.980
Coupar Angus and Meigle 5.490 11.910 2.169
Alyth 4.605 8.479 1.841
Blair Atholl, Strathardle and Glenshee* 8.748 22.524 2.575
Blairgowrie East (Rattray) 3.395 9.406 2.771
Blairgowrie West 2.811 7.153 2.545
Stanley and Murthly 7.042 16.506 2.344
Luncarty and Dunkeld 6.068 12.446 2.051
Pitlochry 4.553 12.053 2.647
Rannoch and Aberfeldy 10.167 25.799 2.538

Page 93

41
(NB: The settlements of St. Fillans, Blair Atholl and Glenshee are within the
territory of Perth and Kinross, but will be covered by the LDPs prepared by
Loch Lomond and the Trossach National Park (St Fillans) and the
Cairngorms National Park (Blair Atholl and Glenshee) 
This comparison in the journey times between driving and public transport
illustrates a variety of challenges for specific areas. While some zones show
long journey times for both modes, indicating significant distances to key
services, the most immediate finding points at noticeable shortcomings in
the provision of public transport. While journey times are often longer in
rural areas, some neighbourhoods within the city of Perth, such as
Burghmuir and Oakbank or Letham, present lengthy journey times for
public transport. These make buses less attractive, and contribute to
higher levels of private car use within urban areas. 
Travel behaviour
After describing the infrastructure present for individual modes, and how
this is generally used, we can briefly introduce an analysis of observed
travel behaviour for the people of Perth and Kinross.
Main mode of travel
Chart below uses data from the Scottish Household Survey to describe
percentages for each travel mode in Perth and Kinross, and a comparison
to national averages. 
The chart illustrates how Perth and Kinross experiences higher than
average levels of reliance on the private car. The mode share for
sustainable options (walking, cycling and public transport) is consistently
lower when compared to the national average. This can be considered
consistent with previous sections of this chapter, with travel behaviour
likely caused by the rural nature of the council territory, the longer travel
distances to key trip attractors and the lower standard of infrastructure
and services for sustainable options.
Mode of travel to work
The Scottish Household Survey also includes data analysing how people
travel to work. Chart below shows percentages for individual travel modes
by users in Perth and Kinross and compared to the national average.
22
64
10
1 2 0 0 1
23
55
11
2
6
1 2 1
0
10
20
30
40
50
60
70
Walking Driver
Car/Van
Passenger
Car/Van
Bicycle Bus Taxi or
minicab
Rail Other
Perth and Kinross Scotland

Page 94

42 
These results also show a higher level of usage of cars and vans to travel to
work, consistent with the main mode of travel section. However, results
for travel to work indicate high mode share for walking, significantly above
the national average. As seen in the main mode of travel results, public
transport in general, and specially bus, present mode shares that are
considerably lower than average.
Travel to school
Sustrans publishes regular updates to their Hands Up Scotland Survey. This
exercise looks at how pupils across Scotland travel to school at different
ages. The dataset offers a comparison in travel choices since 2008, as
shown in chart below for primary and secondary schools in Perth and
Kinross. 
The information in chart above shows walking is consistently amongst the
most popular modes of travel to school for primary and secondary pupils.
The more granular data confirms this is the case for both age groups. 
However, there are significant differences in travel choices for pupils of
each school type. For example, primary school pupils are much more likely
to be driven to school (24.2% on average for the 2008-2023 period)
compared to pupils attending secondary schools (11.8%). In line with this
evolution in travel patterns by age group, the use of Park & Stride facilities
is significantly more common in primary school pupils (10.8%) than in
secondary schools (2.9%). 
18
69
7
1 1 2 2
13
64
4 3
9
4 2
0
10
20
30
40
50
60
70
80
Walking Driver
Car/Van
Passenger
Car/Van
Bicycle Bus Rail Other
Perth and Kinross Scotland
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Walk Cycle Scooter / Skate Park & Stride Driven Bus Taxi Other

Page 95

43
The most significant change in travel choices for pupils relates to the use of
buses. This is a relatively unlikely option for primary school pupils (7.7% on
average between 2008 and 2023), but becomes the most popular travel
mode for pupils travelling to secondary schools (44.4%). Conversely,
cycling goes from being the mode of choice for 5.8% of primary school
pupils to being preferred by only 1.2% of pupils attending secondary
schools.
Other considerations
When assessing the projected demand levels of transport infrastructure, it
is important to understand how commuting patterns have changed in
recent years. Since the COVID19 pandemic, a mixture of people that travel
to work, those working from home, and hybrid arrangements have
triggered changes to the way transport infrastructure and services are
used. These trends are still evolving, and may continue to change, creating
a challenging environment when trying to predict travel behaviour. Statista
published data tracking the distribution of different work arrangements in
the UK, illustrating the potential for further change in the future.
Transport emissions
The environmental impact associated with our transport system is one of
the most important aspects shaping the priorities for national, regional and
local policies. NTS2 reports that the transport sector is responsible for 37%
of the total of Scotland’s greenhouse gas emissions, with a total of around
14.9 million tonnes of carbon dioxide equivalent (CO2e). These emissions
are broken down by subsectors, with cars, accounting for 40 of transport
emissions. Vans and heavy goods vehicles are responsible for 12.5% each,
bringing the total for road-based transport to around 65%.
The Department for Business, Energy & Industrial Strategy (BEIS) has
published local authority and regional estimates of carbon dioxide
emissions, with data covering from 2005 to 2022. Table below shows the
evolution of carbon emissions in Perth and Kinross for that same period,
including total for the transport sector as well as relevant individual
modes. 
The evolution of these emissions point at road transport as the key
contributor, with cumulative emissions that remain consistently above
95% of the total for the transport sector. This is despite vehicles becoming
more efficient in their emission levels. The reason for this consistent
548.8551.6
561.5 542.1
530.9 526.7
521.9 509.4
511.0 519.9
532.0 547.4
562.9 548.8
539.0 422.6
458.7 498.3
0
100
200
300
400
500
600
Road Transport (A Roads) Road Transport (Motorways)
Road Transport (Minor roads) Diesel railways
Transport 'other' Transport total

Page 96

44
emission volumes is that car kilometres registered in the local authority
have steadily increased prior to the COVID19 pandemic, and appear likely
to revert to those levels after the disruption in recent years.
The Scottish Government has shown their intention to tackle road
transport emissions through a variety of interventions. These include
measures shown in the commitment to a reduction of vehicle kilometres
by 20% by 2030, encompassing local living principles, behavioural change
campaigns and infrastructure improvements to digital connectivity, active
travel and public transport. This national policy, and a regional study
looking at options for the Tactran region, have been introduced in the
policy section of this chapter. 
The rail system is also a contributor to transport emissions in the council
area. While the volume of emissions of the railway is significantly smaller
than that of road-based transport, there are initiatives to try and reduce
these. As shown in the Rail Decarbonisation Action Plan, the majority of
the lines in PKC are expected to be electrified by 2035, delivering a
significant reduction to their emission levels.
Low carbon road travel
Aside from the interventions aiming to reduce the reliance on the private
car, PKC is committed to support a transition to electric vehicles (EVs) to
further accelerate the decarbonisation of the transport system. At the time
of writing this chapter, a total of 79 charging opportunities were publicly
available and under PKC inventory, with 23 installed within council
premises to support service vehicles. As illustrated in the Electric Vehicle
Infrastructure Fund Strategy and Expansion Plan, it is estimated that the
total network of chargers within the council territory includes 49 rapid
units, 117 fast chargers and 901 home chargers.
Map below shows the coverage of EV charging points across PKC, with car
and van ownership rates also displayed. 
The Scottish Government is supporting local authorities in their efforts to
grow their EV charging networks. The Electric Vehicle Infrastructure Fund
(EVIF) was established to distribute financial support for councils to deliver
chargepoints that enable a just, fair and inclusive transition to electric
mobility. The fund, managed by Scottish Futures Trust, is collaborating

Page 97

45
with local authorities to channel funds for the delivery of infrastructure
outlined in the Strategy and Expansion Plan. PKC is currently trying to gain
access to this EVIF funding in partnership with Angus Council, hoping to
deliver an additional 91 chargers. These would include:
• Mini hubs, with a small cluster of chargers to support strategic
locations
• Fast chargers to support rural communities, and urban areas where
off-street parking is limited
• Rapid chargers to reinforce existing locations at the South Inch in
Perth and in Kinross
These plans to expand the network of EV chargers corresponds with the
growing share of EVs within the local authority. Chart below uses data
from the UK Government Vehicle Licensing Statistics (tables veh0105 and
veh0132) to show the number of Ultra Low Emission Vehicles (ULEV),
including Battery Electric Vehicles (BEV) and Plug-in Hybrid Electric
Vehicles (PHEV), as well as their market share compared to the total
number of vehicles registered in Perth and Kinross. 
Low Carbon Transport Hub
In order to enable reductions in transport emissions, PKC has developed
the Broxden Low Carbon Transport Hub. This location offers a combination
of infrastructure to support low carbon road travel and active travel
modes, while enabling renewable energy generation. Thanks to its location
at the Park & Ride immediately adjacent to the A9, it offers a sustainable
option for people travelling by Perth.
The project was funded through the European Regional Development Fund
and the Tay Cities Deal, and includes the following infrastructure:
• 15 EV charge points
o 6 x rapid (43kW – 50kW)
329 568 1001 1406 1955
223 348
537
711
926
0.3% 0.4% 0.6%
1.0%
1.7%
2.3%
3.0%
0.0%
0.5%
1.0%
1.5%
2.0%
2.5%
3.0%
3.5%
0
500
1000
1500
2000
2500
3000
3500
BEV PHEV ULEV market share

Page 98

46
o 8 x 7kW
o 1 x Disabled / mobility impaired charging space (43kW –
50kW)
• Solar carport canopies in support of EV charging stations
• New electric substation
• Battery storage system
• Smart Energy Management Platform
• Public Transport Information Display (inc. real time bus information)
• 2 x e-bike charging stations
• Secure storage for private bicycles
In addition to the infrastructure listed above, the project incorporated the
installation of IT solutions to support user experience. This includes a
booking system for EV charge points, and a virtual online hub associated
with the facility.
The EV charging infrastructure delivered within the Low Carbon Transport
Hub has allowed for an increase in the capacity of the charging network.
Between December 2023 and September 2024, a total of 12,817 charging
sessions were supported. These are estimated to represent carbon savings
of over 529 tCO2e compared to internal combustion engines. 
Summary of Implications for the Proposed Plan:
Perth and Kinross Council will commission an adequate and proportionate
Transport Appraisal to inform the policy content of the new LDP.  It is
understood that Transport Scotland will publish an updated Development
Planning Transport Appraisal Guidance during 2025. We will aim to
integrate this new guidance into our appraisal. The Council will work in the
commission of a suitable traffic model that can support the assessment of
the LDP and inform land use allocations.
The Local Development Plan is required to prioritise future development
sites that can be accessed by sustainable transport modes. The Plan’s
spatial strategy will also reflect the objectives of the sustainable
investment hierarchy. Accessibility by a range of transport modes is
required and to reduce car-dominance where possible, with particular
cognisance of the rural highland areas within Perth and Kinross. 
The local and regional transport strategies, as well as an appropriate and
effective transport appraisal, will inform the Local Development Plan,
including evidence of transport capacities, and an appraisal of the spatial
strategy on the transport network. It is understood that Transport Scotland
will publish an updated Development Planning Transport Appraisal
Guidance during 2025. We will aim to integrate this new guidance into our
appraisal.
Through the next stages of LDP3, we will ensure there is consistent
collaboration with a range of internal and external partners. As described
in our Mobility Strategy, successful transport networks rely on the
cooperation between mobility, planning and digital services, and with the
support of other actors both within and outside the council. This will aim
to deliver decisions that enable optimal performance across the three
domains within the Triple Access Planning (physical mobility, spatial
proximity and digital connectivity). Diagram below is taken from the new

Page 99

47
Mobility Strategy Action Plan, and illustrates the range of actors that will
be engaged. 
Gaps, Uncertainties or Key Issues Raised:
Data gaps
While the combination of council-sourced, regional and national data
provides information on most issues, there are a series of shortcomings in
the availability and quality of the data. These are summarised as follows:
• Some of the datasets used are aged, and would benefit from more
up to date information. This is the case of Scottish Transport
Statistics, Scottish Household Survey and Reported Road Casualties.
The last update dates from 2022 – while this is not normally
considered an aged dataset, 2022 was still heavily influenced by the
abnormalities that were caused during the COVID-19 pandemic.
The Council will engage with Transport Scotland or any other
relevant data owners to obtain the most accurate and relevant
information available.
• The study uses data from the Scottish Household Survey for several
sections of the document. This source builds its findings on a
reduced number of responses, which can fail to provide an accurate
representation of the population of Perth and Kinross. In order to
better illustrate the differences across settlements and in rural
areas, larger response bases would be necessary. At the time of
writing this paper, no alternative source had been identified.
In addition to these issues with the data sources, the paper presents a
series of gaps in the data, as listed below:

Page 100

48
• Road condition data (specific to Perth and Kinross local network).
The Council does not currently have records showing this
information, which can be helpful to identify locations that are
likely to require upgrades should new development takes place
• Road network capacity and flow data (specific to Perth and Kinross
local network). This is not currently available within the Council, but
will be considered for the transport appraisal. It would support the
evaluation of sites and settlements, helping understand how the
local road network is likely to perform in the event of new sources
of travel demand.
• Car park occupancy and length of stay data at railway stations.
Specifically for Perth City, this would help understand whether the
aggressive pricing created unintended consequences by attracting
other drivers that are not users of the station.
• Bus service data. In addition to the data collation exercise that the
Public Transport team is undertaking, having access to data for
commercial services would significantly improve the quality of the
insights regarding current provision and performance. These appear
to be commercially sensitive for operators, and no reliable proxy
has been identified.
With regards to the modelling information retained by Transport Scotland,
we understand this might be made available in the future. The Council will
work to identify, update and address those gaps during the preparation of
the Transport Appraisal, engaging with Transport Scotland to outline
opportunities to streamline collaboration. We will ensure we gain relevant
insight on journey times and delay times specific for the Perth and Kinross
road network, with attention to cross boundary factors that can influence
this performance and reliability metrics. 
The Transport Appraisal work will include the necessary measures to
address gaps related to the quality, frequency and accessibility of public
transport services. We expect our Public Transport team to have fully
developed the route and patronage database, and will use this to support
the definition of suitable areas for development that reduce the reliance
on the private car and enable sustainable travel choices.
Uncertainties
The development of transport infrastructure is often dependent on a
combination of funding sources. PKC’s commitment and financial
contribution generally requires the use of external funding. As a
consequence, there is a degree of uncertainty regarding the availability of
sufficient financial support at national and regional levels. This may impact
the delivery of projects that, under the Infrastructure First principle, could
threaten the viability of development.
As illustrated in the analysis of specific modes, the key transport routes
serving settlements within Perth and Kinross are also linked to areas in the
neighbouring local authorities. The performance of the network, and the
ability to deliver improvements to the regional infrastructure, will often
depend on the ability for PKC to work in coordination with other
organisations.
Lastly, there is significant uncertainty surrounding the wider transport
industry with regards to the evolution of working and commuting patterns.
While these travel behaviours appear more stable when compared to
recent years, it is unclear whether the existing trends of hybrid working

Page 101

49
will remain unchanged. Variations to these arrangements can create
significant changes to travel behaviour, shaping demand on specific
modes. These uncertainties should be considered when appraising
development opportunities at later stages of the LDP process.
Summary of Stakeholder Engagement
The Big Place Conversation (BPC) is the main consultation exercise
undertaken by PKC in support of their LDP process. It took place in 2023
and created opportunities to engage with communities across the local
authority, as well as a variety of minorities and interest groups.
Input received through the consultation has been collated in the BPC
results page. This section includes summaries for individual community
councils and wards, as well as overall reporting with council-wide findings.
The BPC follows the Place Standard methodology. Transport and
movement are key components of this type of questionnaire, and
generated large volumes of responses. In addition to the LDP process, the
information gathered through the BPC also informed the Council’s Mobility
Strategy. This input is summarised in the Main Issues Report - Let’s Talk
Transport section of the strategy. In conjunction with the summaries
available in the results page, a few broad ideas can be drawn to summarise
how local communities feel about transport infrastructure and the impact
on their experience of place:
• Need for improvements to local walking and cycling infrastructure,
including the creation of better dedicated facilities as well as the
enhancement of local environments for everyday journeys
• Consistent concerns regarding vehicle speeds through built-up
areas. This is seen as a significant safety issue, and a deterrent for
people to walk and cycle
• Traffic volumes, often associated with settlement growth, are
highlighted as a negative element for local living. Respondents
consider the high volume of road vehicles, and the associated
pressure on parking capacity, damage the quality of their towns and
villages
• Public transport provision is consistently raised as a concern. Issues
of reduced frequency, low reliability levels and inefficient route
designs appear to deter potential users, perpetuating the private
car as the default choice for some locations. This is the case in a
number of rural communities with limited choice of bus routes.
• The combination of issues impacting different modes, and the
growing reliance on the private car, was seen as a risk for specific
age groups. Young people and the elderly are considered more
likely to be impacted by these shortcomings, with significant
impacts on social and personal health aspects.
In addition to the input collated through the BPC exercise, PKC has
established stakeholder engagement activities to consult on the content of
this Transportation (including sustainable transport) section. After the
topic paper was prepared, members of the public and recognised
stakeholders were invited to provide their views on the data sources
suggested and the implications for later stages of the plan. A total of 10

Page 102

50
comments were received. A summary of these views is provided in the
‘Statement of agreement / dispute’ section of this paper.
As a key stakeholder in the topic of transportation, PKC has taken part in a
more detailed discussion with Transport Scotland on the content of this
issue paper and a statement of agreement has been received. 
In addition to the input received through the BPC exercise, the Council
carried out a consultation of the Topic Papers for individual subject
matters of NPF4’s national planning policies suite. The comments received
the transport section of the Topic Paper 014: Infrastructure, and how the
Council has taken those responses into account through the production of
this Evidence Report are set out in the ‘Statements of Agreement/Dispute’
section to follow

Page 103

51

Page 104

52
Statements of Agreement/ Dispute:
10 responses were received on the Transportation (Including Sustainable Transport) section of our Infrastructure Topic Paper.  6 responses neither agreed
nor disagreed with the list of evidence evaluated or summary of implications for the Proposed Plan provided.  3 agreed, and 1 disagreed but did not wish for
their comments to be registered as a formal dispute to the Evidence Report. 
A summary of these comments, their status, and the Council’s response in the following table. 
Respondent Agree or
Dispute
Summary of Comments PKC’s Response
Ristol Consulting Agree List of Evidence/Datasets and summary of Implications for
Proposed Plan (PP): Consistent with our submissions on
climate adaptation, green belt, infrastructure, business and
housing, we welcome the scope of the topic papers and, in
the preparation of the new LDP, encourage the development
of integrated energy, mobility and digital infrastructure to
deliver a just transition approach to climate adaptation. 
Policy drives change and as such, a spatial framework which
actively focuses on decarbonising heat and transport through
smart local energy neighbourhoods for existing and planned
developments, a network of mobility hubs and collocating
uses (i.e. renewable energy generation and storge with green
hydrogen production and HGV refuelling and logistics), would
enable scalable change to materialise within the 10 year plan
period. This may give rise to policy tensions such as green
belt of flood risk that would merit evaluation in order to
deliver sustainable infrastructure to support climate
adaptation.
Further Comments:  No further comments made.
Formal Dispute: No
Noted
The policy content of the LDP will
include consideration to low
carbon energy systems and
sustainable transport solutions.
These will be delivered in
observance of wider PKC policy
including the new Mobility
Strategy published in 2024.
NatureScot Agree List of Evidence/Datasets and summary of Implications for
Proposed Plan (PP):Green infrastructure is referenced once
but we think the value of blue-green infrastructure could be
Noted.

Page 105

53
Respondent Agree or
Dispute
Summary of Comments PKC’s Response
emphasised more strongly in this paper. This could include
further emphasis on the connection between this policy topic
paper and the blue-green policy topic paper. 
It would also be useful to know the reasoning for integrating
Transport into this paper rather than having a separate paper
as with the other NPF4 policies.
Further Comments:  No further comments made.
Formal Dispute: No
Blue-green infrastructure
information is included within its
own section.
The infrastructure paper has now
been divided into specific topics,
with ‘Transport’ being introduced
in its own separate document.
Tactran Neither List of Evidence/Datasets and summary of Implications for
Proposed Plan (PP):While setting out a comprehensive suite
of datasets established how, where and why people and
goods travel and the subsequent travel demands, supply and
consequences, the focus in relation to deliverability (para
3.24 to 3.32 refer) maintains an urban focus, solely focusses
on the City of Perth. As such, it omits key questions which the
evidence base should seek to answer to inform a
comprehensive policy approach towards the location of
development and addressing the travel demands of
development through a:
i) Thorough understanding of both rural and urban
problems, opportunities, issues and constraints
ii) Thorough understanding of the existing and
potential capacity of the transport networks
A comprehensive review of relevant data sources will provide
the required intelligence that will help identify both the
transport and travel implications of new development both in
rural and urban Perth and Kinross. Otherwise, Perth and
Kinross Council’s LDP3 risks not fully understanding the
transport and accessibility impacts of its proposals.
Paragraph 3.32: The paragraph refers to the vision of the
Tayside and Central Scotland Regional Transport Strategy
Noted
The document acknowledges the
role of the RTS for the Tractan
region after its approval in 2024.
The next stages of the LDP will
include the development of a
transport appraisal, which will be
informed by updated Development
Planning Transport Appraisal
Guidance (DPTAG) when issued by
Transport Scotland. We
understand this updated guidance
will be available in summer 2025,
and should provide a consistent
framework to assess the impact of
development of the transport
network.
The latest version of this document
includes a breakdown of
infrastructure and performance of
the network in urban and rural
settings. Additionally, the transport
appraisal will aim to identify issues

Page 106

54
Respondent Agree or
Dispute
Summary of Comments PKC’s Response
2024 – 2034 (RTS). It is a requirement for Councils to perform
their functions as they relate to transport consistently with
the respective Regional Transport Strategy (RTS). The Tayside
and Central Scotland RTS has now been approved by the
Cabinet Secretary for Transport and has been adopted at the
Tactran Board Meeting on 11 June 2024. In terms of being
realistically able to work towards the vision of the RTS, the
document recognises, and continually emphasises, that the
scale of the challenge means that there is need to focus
activity and to prioritise those locations and populations
where the most support is required to achieve the adopted
outcomes.
The ability of sustainable travel to meet the travel demands
of development will be informed by distance travelled by
mode share (and the average journey times to work);
proportion of people who walk, cycle or use public transport
regularly; location of services (employment, education,
healthcare, retail etc) and the ability to access these services
by public transport (i.e. frequency and timing of public
transport); the origins of the workforce and the destination
of the working age population.
In addition, the ability to meet the travel demands of
development by sustainable modes will be informed by the
barriers that people face to using sustainable travel such as
awareness of options and ability to plan multi-modal
journeys, cost, physical ability (e.g. disabilities), safety and
security.
The Tayside and Central Scotland RTS further establishes the
need to provide integrated solutions to provide a realistic
alternative to the car and encourage the required mode shift. 
Another principle established within the RTS is the need to
recognise the different circumstances and opportunities as
with the provision and capacity of
transport infrastructure
throughout the council’s territory,
covering urban and rural areas.
The latest version of this transport
chapter includes an analysis of
travel behaviour, showing mode
share figures and accessibility of
key services. The next stages of the
LDP will give careful consideration
to the interrelation between land
uses and mobility, including the
delivery of 20 Minute
Neighbourhood chapters to inform
future development.

Page 107

55
Respondent Agree or
Dispute
Summary of Comments PKC’s Response
they relate to the rural and urban populations across the
region.
Tactran asks that Figure 5 (p.18 refers) is amended
accordingly to better reflect the four RTS strategic objectives
along with the established principles.
Further Comments:  No further comments made.
Formal Dispute: No
Kenmore and
District Community
Council
Neither List of Evidence/Datasets and summary of Implications for
Proposed Plan (PP):Generic and place-based comments are
included in the relevant section of the Evidence Report.
Further Comments:  No further comments made.
Formal Dispute: No
No response required
PKC Transport
Planning 
Agree List of Evidence/Datasets and summary of Implications for
Proposed Plan (PP):The PKC Transport Planning team
highlighted linkages between key objectives of the Mobility
Strategy (Local Transport Strategy), including the ASI
approach (Avoiding / Shifting/ Improving) and key actions
such as:
Action 173: Explore potential for parking areas outwith town
centres across Perth and Kinross, including Park-and-Ride /
Park-and-Choose.
Action 86: Ensure that land identified as having potential for
Park & Ride development is safeguarded within the
appropriate Development Plan(s).
Action 185: Improve access to park and ride services for non-
car owners and car owners.
Action 88: Support the provision of new, relocated and
enhanced train stations where this will improve access to the
rail network and improve integration within the area being
served. 
Noted
The LDP team agrees on the need
to continue working in close
cooperation with Transport
Planning.

Page 108

56
Respondent Agree or
Dispute
Summary of Comments PKC’s Response
Action 38: Support partners to assess options on last mile
freight delivery and the sustainable movement of goods.
It is evident that continued collaboration is required between
the LDP team and the Transport Planning team to identify
development sites that can be accessed by sustainable
transport modes. Where design insight and developer
contributions can be leveraged, we commit to supporting the
LDP process.
Further Comments:  No further comments made.
Formal Dispute: No
Homes for Scotland Disagree, but
does not wish to
register as a
formal dispute
List of Evidence/Datasets and summary of Implications for
Proposed Plan (PP): To assist in delivering the priorities set
out in 3.18 of the topic paper the Transport section of the
report should acknowledge the publication of the Scottish
Governments Local living and 20 minute neighbourhoods:
planning guidance.  This publication should form part of the
evidence gathering alongside a map of local amenities (retail,
education, health care etc.) for each settlement detailing the
maximum distance to walk or cycle to the amenity. These
should be overlaid on plans of the transport network to assist
in identifying sustainable locations for new homes. It should
also be noted that where there are gaps in the provision of
local services, such as retail, it may be possible for large scale
residential allocations of circa 500 homes to deliver a new
facility.
It is suggested that the following additional evidence is
considered by the Council:
Local living and 20 minute neighbourhoods: planning
guidance (2024), Scottish Government 
Supports the application of NPF4 Policy 15, Local living and
20 minute neighbourhoods
Noted
The latest version of the transport
chapter of the Evidence Report
analyses accessibility of facilities
and services, and the next stages
of the LDP process will ensure
transport policies and site
assessments are delivered
according to the content of NPF4
Policy 15. 
Additionally, these principles will
be discussed in further detail
during the development of 20
Minute Neighbourhood policies
within LDP3. These will form a
separate item, and will inform
other activities within the
development of the plan.

Page 109

57
Respondent Agree or
Dispute
Summary of Comments PKC’s Response
https://www.gov.scot/publications/scottish-government-
planning-guidance-local-living-20-minute-neighbourhoods/
Further Comments:  No further comments made.
Formal Dispute: No
Montagu Evans LLP
on behalf of Loch
Developments Ltd
Neither List of Evidence/Datasets and summary of Implications for
Proposed Plan (PP): No comments made.
Further Comments: Loch Developments Ltd support the
aspiration for LDP3 to prioritise location for future
development that can be accessed by sustainable modes of
transport. The former BCA site in Kinross is located on
brownfield land within the settlement of Kinross. The
redevelopment of the site would allow for improved active
travel links to the site and to Loch Leven Nature Reserve,
along with being well located on a main arterial route into
Kinross which is well served by public transport.
Formal Dispute: No
Noted
No response required
Anonymous Agree List of Evidence/Datasets and summary of Implications for
Proposed Plan (PP): No comments made.
Further Comments: Feel it is a pity that no reference has
been made to the increasing traffic congestion at Broxden.
This has resulted in significant volumes of traffic
leaving/joining the A9 at the Forteviot junction to avoid this.
As a result, increased traffic including HGVs using the B934 &
B935 for onward travel to Bridge of Earn & M90. In addition,
the junction is used for traffic to travel on B934 & B9112 for
Perth & Craigend. The A9 junction is also not suitable,
particularly for traffic joining it from the B934.
Formal Dispute: No
Noted
The latest version of this document
includes a high level summary of
traffic flows, based on permanent
counts as managed by the
Department for Transport. This
includes count points in the
approaches to Broxden
roundabout, but should not be
read as a comprehensive study of
traffic performance in the area. 
While the Development Plan team
is cognisant of the issues regarding
traffic volumes at Broxden, there

Page 110

58
Respondent Agree or
Dispute
Summary of Comments PKC’s Response
are a variety of factors that need to
be considered: 
- That the Evidence Report is
not designed to focus on a
specific location, but to
provide an overall picture
of the transport
infrastructure that is
available, and how it is used
- That the next stages of the
LDP will include the
development of a transport
appraisal, and a site
assessment phase to
understand how
development will impact
the strategic road network
- That Broxden and the wider
A9 are part of the trunk
network, and
improvements to the
capacity and traffic
management will need to
be considered by Transport
Scotland
The LDP and Transport Planning
teams will continue to collaborate,
building on more detailed
information on the performance of
the road network to shape the
next stages of the LDP

Page 111

59
Respondent Agree or
Dispute
Summary of Comments PKC’s Response
Anonymous Agree List of Evidence/Datasets and summary of Implications for
Proposed Plan (PP): No comments made.
Further Comments: No reference made to frequent traffic
congestion at Broxden. As a result, increasing volumes of
traffic including HGVs leaving the A9 at the Forteviot junction
for onward travel to Bridge of Earn to use the M90. Also,
increased traffic on B934 & B9112 for onward travel to Perth
& Craigend. Similar situation in reverse. In addition, junction
at Forteviot not suitable for traffic joining A9.
Formal Dispute: No
Noted
See response to previous comment
Savills on behalf of
Scone Estate
Neither List of Evidence/Datasets and summary of Implications for
Proposed Plan (PP): All stages of LDP3 preparation, including
the final adopted Plan, should recognise the sustainable and
active travel benefits, of the Cross Tay Link Road- this is Perth
and Kinross' most expensive piece of infrastructure and is a
game-changer for Perth and Kinross that has to be
harnessed. 
Connected to this is the potential that large-scale renewables
projects to provide private wire electricity to help
decarbonise transport for those operating in Perth and
Kinross or travelling through. EV charging and HGV charging
are fast growing markets and there are commercial
opportunities to investigate to help reduce car mileage and
lower overall transport emissions.
Further Comments:  No further comments made.
Formal Dispute: No
Noted
The next stages of the LDP include
a transport appraisal that will
inform the Proposed Plan. This will
assess potential cumulative impact
of new development and will help
understand development
opportunities.
While the CTLR and the wider
Perth Transport Futures project are
expected to enable development,
it would be premature to discuss
specific options at Evidence Report
stage.

Page 112

Issue: Infrastructure – Waste Water Treatment and Water Supply
Corresponding NPF4 policies:
• Policy 18 Infrastructure First 
• Policy 22 Flood Risk and Water Management
Corresponding Perth and Kinross LDP3 Topic Paper:
Topic Paper 014: Infrastructure 
Information required by the Act and NPF4 regarding the topic:
The National Planning Framework 4 (NPF4) includes several policy items
applicable to water supply and waste water infrastructure. These include:
• Policy 18 Infrastructure First sets out that the LDP and Delivery
Programme should be based on an integrated infrastructure first
approach. This means that infrastructure needs are understood
early in the development planning process as part of an evidence-
based approach, and that infrastructure considerations are integral
to development planning and decision making. The LDP and
Delivery Programme are to set out the infrastructure requirements
to deliver the spatial strategy, informed by the evidence base. This
is to include information on the location, type, delivery timescales
and body, and the level of contributions. The LDP and Delivery
Programme are to align with relevant national, regional and local
infrastructure plans and policies and the Scottish Government’s
infrastructure investment hierarchy and sustainable travel and
investment hierarchies; and
• Policy 22 Flood Risk and Water Management aims to support LDPs
that strengthen resilience by promoting avoidance as a first
principle, contributing to water resources being used efficiently and
sustainably. 
Policy 22 (d) offers its support to development proposals that can
be connected to the public water mains. If this is not feasible, it is
expected that the applicant will demonstrate that water for drinking
water purposes will be sourced from a source that is sustainable
and resilient to scarcity.
The Scottish Government’s Infrastructure Investment Hierarchy is
promoted in National Planning Framework 4 (NPF4), it prioritises
enhancing and maintaining existing assets, then repurposing and co-
location of assets, then new-build assets.
The Town and Country Planning (Scotland) (Act) 1997, as amended:
• section 15(5) requires local authorities to take into account the
following matters in their local development plan spatial strategy:
(d) “the infrastructure of the district (including communications,
transport and drainage systems for the supply of water and energy,
and health care and education facilities)”, and (e) “how that
infrastructure is used.
Perth and Kinross’ LDP3 will employ an evidence-based approach to
understand the infrastructure requirements necessary to support future
development. These needs will observe strategies and plans drawn at local,
regional and national levels.

Page 113

Links to Evidence:
Planning Advice Note 79: water and drainage
Scottish Water, The Development Plan Process: A Guide to Considering
Water and Waste Water Services
SEPA, Policy and Supporting Guidance on Provision of Waste Water
Drainage in Settlements (2006)
Scottish Water Waste Water and Water Supply Strategic Asset Capacities 
(add Core doc ref)
Scottish Water Current Investment Programmes 
Scottish Water Drainage and Water Supply Network Spatial Data (will
inform the Proposed Plan, and SEA site assessment)
Climate Change Adaptation Plan (Scottish Water)
Scottish Water: Our Sustainable Future Draft long term strategy (being
consulted on till 23rd of March 2025)
Summary of Evidence:
The Water Supply and Waste Water System in Scotland
Planning Advice Note 79: water and drainage outlines ways for local
authorities to plan for development to inform the delivery of water
infrastructure. The document includes a brief description of how water
supply and wastewater systems are configured.
Water Supply
Water is taken from lochs, rivers, aquifers and reservoirs and piped to
water treatment works. Harmful bacteria, plant material, minerals, natural
or synthetic chemicals, and dirt are removed by screening (removal of
debris), clarification (removal of mud and silt), filtration (removal of small
grit and colour), disinfection (removal of bacteria) and pH correction
(reduction of acidity). The treated water is stored in large tanks and service
reservoirs. The clean water is then taken by trunk water mains and
distributed to properties via local water mains and service pipes.
Waste Water
Waste water (sewage) from properties passes through the drains into the
local waste water sewers and from there into the trunk waste water
sewers to be directed to waste water treatment works. In the past the
waste water network was used to capture both surface water runoff and
foul water in one pipe. Since the 1950s the conventional approach to
drainage has been to take the rainfall runoff from buildings, roads and
pavements and directly discharge to a watercourse. For all new
developments sustainable drainage schemes (SuDS) are now required for
surface water systems which provides attenuation and treatment prior to
return, by natural dissipation where possible, to the water environment.
Having separate systems frees capacity for waste water and reduces
emergency overflows. Waste water is transported to treatment works
where gross solids and grit are removed and the remaining water is
treated. The organic solids which are removed from the water in the form
of sludge are utilised in recycling outlets. Once the water is treated to an
acceptable standard it can be discharged back to the river or the sea.
The water and drainage infrastructure described above can be split into
four parts:
• Part 1 assets: connections from individual properties to a main or
sewer;

Page 114

• Part 2 assets: water mains and sewers that connect developments
to trunk mains and trunk sewers, and some sustainable drainage
systems ( SuDS);
• Part 3 assets: local bulk infrastructure, such as trunk mains and
trunk sewers, water service reservoirs, waste water pumping
stations and some SuDS; and
• Part 4 assets: strategic assets such as raw water intakes, raw water
impounding reservoirs and aqueducts, water treatment works and
waste water treatment works.
The great majority of assets under Parts 2, 3 and 4 are owned and
maintained by Scottish Water. There are also private systems, the
maintenance of which is the responsibility of an owner or group of owners.
Most small-scale private systems are septic tanks discharging to land
soakaways or surface water, but they can also include systems providing a
greater degree of treatment, such as SuDS, proprietary treatment systems
or reedbeds. Private schemes can later be adopted by Scottish Water as
part of their network, but only if built to an adoptable standard.
Under Part 2, Section 16B(3) and Section 15(5)(d)-(e) of the Planning Act
2019, in the preparation of their Evidence Report, planning authorities are
required to provide their views on the infrastructure of the plan area, and
how that infrastructure is used.
The provision of water supply and wastewater management services relies
on the roles of three organisations: 
• Local Authorities: for water supplies not provided by Scottish Water
(around a 3% of the Scottish population, more common in remote
areas of the country), local authorities are responsible for its
regulation in conjunction with the Drinking Water Quality Regulator.
Any matters related to the creation or modification of private water
supplies are supervised by the environmental health team for the
local authority.
Under the Water Intended for Human Consumption (Private
Supplies) (Scotland) Regulations 2017, Perth and Kinross Council
carries out risk assessments for private water supplies every five
years, with yearly sampling. Small domestic water supplies are
exempt.
Local authorities are also in charge of the drainage of local roads
and public highways. Drainage of trunk roads falls within the remit
of the Scottish Government.
• Scottish Water: a public body acting under the direction of Scottish
Ministers and the Scottish Parliament, Scottish Water provides and
manages the water supply to most of the population in Perth and
Kinross.
With regards to wastewater, Scottish Water manages the flow from
the point that it leaves private property and joins the public sewer. 
• The Scottish Environment Protection Agency (SEPA) oversees the
environmental quality of the water supply systems, reporting to
ministers on investments to deliver improvements.
In addition to the responsibilities described above, local authorities,
Scottish Water and SEPA play an active role in flood prevention,
management and warning duties. 
PAN79 discusses the need for planning departments to establish
communication with Scottish Water and SEPA to:

Page 115

-  Discuss specific issues such as the reduction and mitigation of the
environmental impacts of discharges from the waste water network
- Understand how Scottish Water and developers are overcoming
existing constraints affected consented applications
- Inform Scottish Water of the projected/ predicted development,
both in location and scale
Additionally, the note encourages local authorities to collaborate with
developers to review water supply and drainage issues. This is suggested to
take place during the annual housing land audit process. 
SEPA’s policy and supporting guidance on provision of waste water
drainage in settlements mentions that SEPA ‘will engage with the land use
planning process to ensure that proposed developments do not
compromise environmental quality or fragment the public sewerage
system’ and ‘will engage with Scottish Water and the planning authorities,
on a regular basis, to review development constraints and available
environmental capacity’.
Scottish Water’s guidance for the Development Plan Process (The
Development Plan Process (Scottish Water) outlines opportunities to
establish robust communication between policy makers and Scottish
Water, promote best practice and enable planning authorities to provide
optimal responses to the local environment. While the document was
drawn prior to the publication of NPF4 and refers to the plan making
process, it insists on the value for local authorities to engage with the Asset
Strategy Development Planning team at an early stage. These
conversations can minimise barriers and ensure the adequate provision is
in place ahead of development.
The guidance also expects Scottish Water to be involved in discussions
throughout the drafting process for Local Development Plans. There is a
preference for development that takes place where water infrastructure is
already in place, but investment will be considered to accommodate
growth in other locations.
Scottish Water’s Our Sustainable Future Together Draft Long Term Strategy
acknowledges joint working with Local Authorities on waste water
infrastructure, and highlights Perth, as a case study, and example of where
they are making significant investment to make the city climate ready, and
support major housing and business growth over the next 20 years,
phasing work to align with housing building that is planned. This includes a
new ‘super sewer’, improvements to Scottish Water’s water supply network
to improve capacity and resilience, and changes to existing wastewater
treatment works.
Water Supply and Waste Water Infrastructure in the Area
The provision of water supply and waste water services for Perth and
Kinross needs to be understood within a wider context. The network
managed by Scottish Water relies on a series of water and waste water
treatment works that draw service areas beyond the territory of the
Council. Consequently, water services should be considered a cross-
boundary matter that requires continuous coordination with Scottish
Water, SEPA and neighbouring local authorities. This is particularly relevant
in the case of water supply, with treatment works often covering large
areas across different local authorities.
With regards to the level of capacity available in Perth and Kinross, the
local network is served by a total of 13 water treatment works. Following

Page 116

Scottish Water calculations, nine of these locations are considered to offer
sufficient capacity for the projected levels of development, with the
following four outlined for potential future investment:
• Kirkmichael
• Killicrankie
• Lintrathen
• Lomond Hills
68 of the 85 waste water treatment works serving the territory of Perth
and Kinross are considered for future investment. The growth project for
Perth City have already started, and the improvements to Burrelton works
are approaching sign off at the time of writing. Three further growth
projects are planned for Blairgowrie, Stanley and Meigle, with delivery
estimated for 2026, 2027 and 2029, respectively.
A table summarising the status of capacity for water and waste water
works, and maps showing service areas associated with them, are shown in
the Perth and Kinross Water and Waste Water Infrastructure document.
Climate Change and Resilience
In addition to local growth projects to accommodate development,
Scottish Water is investing in strengthening the water and waste water
services. The Climate Change Adaptation Plan (Climate Change Adaptation
Plan (Scottish Water) identifies the challenges that drought, flooding and
weather changes present for the water networks in Scotland. These can
impact the availability and quality of water and the performance and
reliability of assets.
As a response to these risks, Scottish Water has prepared a series of
interventions to enhance service resilience. These infrastructure
improvements are designed to mitigate the impact of Climate Change, and
to ensure existing and future development is served without disruption. 
Summary of Implications for the Proposed Plan:
The Council will use the 20-minute neighbourhood and local living analysis
and settlement audit work to assess capacity of the waste water and water
networks. This work will support the preparation of the Proposed Plan and
will inform the spatial strategy. Within the Settlement Audit work for the
Proposed Plan, we will develop a template including factors for officers to
consider when assessing each place and its needs to meet the
requirements of the Planning Act, Regulations, LDP Guidance and NPF4
policies.
Settlement audits will consider if the relevant Scottish water/wastewater
asset is near capacity, and if it is in a current investment programme.
Information on Scottish Water assets will allow the Council to consider if
development should be planned in locations where there is existing or
programmed capacity in the water and waste water systems. However, the
Proposed Plan spatial strategy will also be fully informed by the Strategic
Environmental Assessment work, and the 20-minute neighbourhood and
local living analysis and the settlement audit work, to ensure development
is focussed on the most sustainable locations.
When considering potential allocations for the Proposed Plan, the key
agency template for Strategic Environmental Assessment site assessment
with some additions will be used at Proposed Plan stage. This requires the
Council to consider whether potential allocations could connect to the

Page 117

public foul sewer, and the public water mains, and if not if there is a
sustainable water source that is resilient to the periods of water scarcity. 
Scottish Water are funded to provide increased capacity at Part 4 assets,
such as water and wastewater treatment works, to meet the growth needs
for domestic development, and domestic elements of non-domestic
developments. Non-domestic users may be asked for financial contribution
for their growth needs. Significant factors in meeting the 5 growth criteria are
its allocation in Local Development Plan, and securing planning permission.
There may be a timing consideration, and there will be consideration about
overall sustainability, and trying to direct to where there is capacity where
appropriate, however, sites will not ultimately be constrained by current
capacity at the waste water or water asset. Where the developer has
clearly demonstrated the 5 growth criteria Scottish Water will provide the
quantum to deliver available capacity to enable development.
Private water supplies are presumed against in National Planning
Framework 4 unless they will be sourced from a sustainable water source
that is resilient to periods of water scarcity. This is considered further in
the Flood Risk and Water management Issue in Appendix B5.
Gaps, Uncertainties or Key Issues Raised:
During the LDP preparation process, we will continue to engage with
Scottish Water to inform them of likely areas of development. Scottish
Water has reiterated their commitment to not restrict development. With
due communication and agreement on delivery timeline and phasing,
future residential developments can be presumed to receive access to
public water and waste water services. For industrial uses, Perth and
Kinross Council will engage with Scottish Water directly to identify
potential stress points in the available capacity, and the need to deliver
suitable infrastructure. 
Summary of Stakeholder Engagement:
The Council produced and consulted on a series of Topic Papers which
covered the individual subject matters of NPF4’s national planning policies
suite.  These papers set out in detail the evidence the Council has gathered
to help produce our Evidence Report, and which we hope to use to
prepare our LDP3 Proposed Plan. The papers were published on the
Council’s Consultation Hub for a 6 week period during July and August
2024.  As part of our consultation process for LDP3 Topic Papers we
welcomed the views of our key stakeholders (who were contacted
specifically via email regarding the consultation exercise) and the public at
large, on the sufficiency of the evidence gathered, our interpretation of the
implications of that evidence to the Proposed Plan, and on how we intend
to use that evidence to develop our LDP3.  We also asked respondents to
provide links to other sources of available information or data which they
felt we had not included, alongside an explanation of why they considered
any additional sources of information to be relevant to the preparation of
the Local Development Plan.
After consulting on the topic paper, there was further discussion, and
information sharing with Scottish Water, which resulted in the inclusion of
the Scottish Water Waste Water and Water Supply Strategic Asset
Capacities information.

Page 118

Statements of Agreement/ Dispute 
1 response was received from Scottish Water on our Infrastructure Waste Water Treatment and Water Supply Topic Paper. Scottish Water disagreed with the
evidence and suggested some alternative wording however they did not raise a formal dispute so it has been highlighted in amber.  A summary of this
comments, its status, and the Council’s response is provided in the table below.

Page 119

Respondent Agree or
Dispute
Summary of Comments PKC’s Response
Scottish Water Disagree List of Evidence/Datasets and Summary of Implications for Proposed
Plan (PP):  Scottish Water does not disagree with the overall topic paper
contents and evidence sources but have one request for changing of text
relating to water and wastewater. 
Text to be changed:
Deliverability - Section 7.7
"Scottish Water are required to provide capacity for sites which 
demonstrate the 5 growth criteria. Significant factors in meeting the 5
growth criteria are its allocation in Local Development Plan, and securing
planning permission." 
REQUEST THIS IS CHANGED TO:
"Scottish Water are funded to provide increased capacity at Part 4 assets,
such as water and wastewater treatment works, to meet the growth
needs for domestic development, and domestic elements of non-
domestic developments. Non-domestic users may be asked for financial
contribution for their growth needs. Significant factors in meeting the
growth criteria..."
Further Comments: Scottish Water can provide spatial layers via GIS of
our capacities at water and waste water treatment works across Perth
and Kinross. This will highlight areas of cross boundary services into Fife,
Angus and Cairngorms NP. These layers also highlight the extents of the
water and wastewater public networks served by Scottish Water. 
Infrastructure first is a key concept through NPF4, and Scottish Water
supports the consideration early through planning of infrastructure needs
regarding water and wastewater. Scottish Water is funded to provide
growth for domestic and domestic elements of non-domestic
developments and our policy is to provide growth just ahead of need.
The requested change has been
made to reflect the Scottish Water
wording with regard to the funding
of part 4 assets. The Council also
welcomes the information provided
on capacity of water and waste
water treatment works which has
also been added to this Issue. 
Further amendments have also been
made to reflect within the gaps,
uncertainties and key issues raised
the future joint working with
Scottish Water which will be
required when we move forward to
preparation of the Proposed Plan.

Page 120

This approach represents good value for investment of public monies,
and substantially reduces the risk of stranded assets where growth
ambitions are not realised. 
Scottish Water agree that water and wastewater capacities is not
considered a show stopper to new development, however, early
engagement and open discussions to realistic timescales and phasing of
new sites can prevent any delays at site. In addition, it is worth noting
that Scottish Water will still require a full Technical Audit submission for
water and wastewater connections applying to join the existing public
network. Within this area, Scottish Water may request from applicants
the need for further network studies to ascertain impact of new
flow/demand on the existing infrastructure and customers. These could
be standalone drainage and/or water impact assessments, flow and
pressure tests or odour impact assessment for development near large
sewage assets. 
Early engagement directly with Scottish Water's Development Services
department is always strongly encouraged and can be carried out through
our Pre-Development Enquiry application process. 
Formal Dispute:
No