Agenda Document Pack - Perth and Kinross Council - 26/02/2025

Perth and Kinross Council · 26 February 2025
Back to Perth and Kinross Council — 26 February 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Ambition | Compassion | Integrity
Our vision is for
a Perth and Kinross where everyone can live life well,
free from poverty and inequality
Council Building
2 High Street
Perth
PH1 5PH
19/02/2025
A special hybrid meeting of Perth and Kinross Council will be held in the Council
Chamber on Wednesday, 26 February 2025 at 09:30.
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk.
THOMAS GLEN
Chief Executive
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode.
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting.
Members:
Provost X McDade
Depute Provost A Parrott
All Bailies
All Councillors
Page 1 of 162

Page 2

Page 2 of 162

Page 3

Perth and Kinross Council
Wednesday, 26 February 2025
AGENDA
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY FINANCIAL
OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY ITEM ON THIS
AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE OF CONDUCT.
1 WELCOME AND APOLOGIES
2 DECLARATIONS OF INTEREST
3 NOTICE OF PETITIONS
3(i) URGE PERTH AND KINROSS TO BUILD AN AMBITIOUS PH2O
FACILITY
Link to petition: PET-2024-01
BRIEFING NOTE - PETITION TO URGE PERTH AND KINROSS
TO BUILD AN AMBITIOUS PH2O FACILITY
(copy herewith 25/34)
5 - 10
3(ii) SAVE OUR RURAL LIBRARIES
Link to petition : PET-2025-02
BRIEFING NOTE - PETITION TO SAVE OUR RURAL
LIBRARIES
(copy herewith 25/35)
11 - 14
4 STRATEGIC PLANNING UPDATE AND 2026/27 TO 2028/29
GENERAL FUND REVENUE BUDGET
Report by Strategic Lead - Finance and Business Support (copy
herewith 25/36)
15 - 142
5 STRATEGIC INVESTMENT AND COMPOSITE CAPITAL
BUDGET UPDATE 2025/26 - 2030/31
Report by Strategic Lead - Finance and Business Support (copy
herewith 25/37)
143 - 162
Page 3 of 162

Page 4

Page 4 of 162

Page 5

PERTH AND KINROSS COUNCIL
26 February 2025
Petition: Urge Perth and Kinross Council to Build an Ambitious PH2O Facility
Briefing Report by Strategic Lead - Property Services
(Report No. 25/34)
1. Purpose
1.1 The purpose of the report is to provide initial professional and/or technical
advice to Council in response to the petition.
2. Background
2.1 On 4 September 2024, Council approved Thimblerow as the site for the m
new PH2O with the following facilities mix (Report 24/242 refers).
 25m Pool 8 lane (Moveable Floor)
 Further options and costs of adding leisure water to be explored as
part of the next stage of design work.
 12.5m x 8.5m Teaching Pool (Moveable Floor)
 Toddler splashpad
 Indoor Play Area (potential Clip n’ Climb or other family play activity)
 Games Hall
 Fitness Gym 
 Studio 1 (flexible) 
 Studio 2 (flexible)
 Studio 3 (flexible)
 Café
2.2 Approval of the Thimblerow site recognised a number of additional benefits:
 Avoiding loss of either swimming or ice provision during the construction
period (approx. 2 years) as Perth Leisure Pool and the Dewars Centre
can continue to operate unimpeded during the construction phase, which
would not be possible if the original business case to build on the same
site was implemented;
 Avoiding job losses which may have resulted from existing buildings
closing for construction work;
 Anticipated increased footfall in the city centre from bringing PH2O
closer;
 Opportunity for curling community to develop Dewars Centre through
lease agreement.
2.3 The PH2O site decision was also made as part of a wider series of integrated
investment proposals for Perth city centre which together offer a series of
related benefits to create additional public value for residents, visitors and
businesses.
Page 5 of 162

Page 6

These included:
 A new future for Bell’s Sports Centre – public consultation has recently
concluded on options, with the majority of respondents supporting it
becoming an unheated multi-use sports pitches space bringing
additional capacity for in-demand all weather pitches. Further analysis of
the responses and additional feedback received is ongoing.
 Purchase of Pullar House and development as a customer-facing public
sector hub which will be an addition driver for increased footfall
alongside the city centre swimming pool and sports facility.
 Purchase of Kinnoull Street multi-storey car park creating a more
consistent car parking offer in Perth city centre, with the currently under-
used car park being reviewed to create a more appealing offer and offset
the reduction of car parking spaces at Thimblerow.
 In line with Council policy land freed up on the current Perth Leisure Pool
site could become social/ affordable housing to answer the demand for
accommodation in the city.
2.4 Work is ongoing to deliver the decisions of Council, including working with
curling representatives and providing funding to support their feasibility study
for the Dewar’s Centre. Outcomes and progress updates, particularly in
relation to the leisure water options for the Thimblerow site and the future of
Bell’s Sports Centre, will be reported back to Council in due course.
3. Petition
3.1 A valid petition has been received by the Council in relation to the PH2O
proposal.
3.2 The petition seeks:
Perth and Kinross Council to reconsider and/or cancel plans for Perth Leisure
Pool & Dewar's replacement to be built at Thimblerow and to instead approve
& construct a fit for purpose, ambitious replacement facility at the current, and
originally proposed site at Glover Street. This facility should, at a minimum,
have the following -
 Dedicated Leisure Pool/Water with flumes, kids water play park (Similar
to the current Monkey Jungle at Perth Leisure Pool)
 25m six or eight lane training pool
 Ice Rink/Hall
 Large commercial Gym (Similar to the arrangement at Bell's Sport
Centre before closure)
 Fitness Studios
 Sports Halls
 Bowling Hall/Events Hall capable of holding events currently held at
Dewars
Page 6 of 162

Page 7

4. Main issues
4.1 The ask of the petitioners is to construct PH2O on the existing Glover Street
site and to provide (as a minimum) the facilities mix specified above, which
aligns with the Outline Business Case (OBC) presented to Council and
subsequently approved at a cost of £85-£90 million as part of the Capital
Budget in February 2022 (Report 22/36 refers).
4.2 In March 2023, the Council decided to pause the project and instructed
officers to undertake a Transformation Review of Leisure Assets (the ‘Leisure
Asset Review’), on the grounds of overall project affordability with increased
loan charge rates, energy price rises and general inflation pressures (Report
23/73 refers).
4.3 Taking into account the findings in relation to usage, market trends and
affordability, the recommendations from the review were to reduce the
facilities mix proposed in the Outline Business Case and to co-locate
PLP/Dewars/Bells onto one site to generate further efficiencies and savings
from property costs. (Report 24/19)
4.4 The review findings and affordability factors informed the revised proposal
(set out above at section 2) which was approved by Council in September
2024. 
4.5 The facilities mix proposed by the Petitioners is the same as that contained in
the original OBC which was deemed unaffordable by Council. The original
borrowing costs, inflation costs, energy and operating assumptions have been
updated for the information of Council, and the table below represents the
current estimated cost of the Petitioner’s proposed facilities mix. 
Sept 2024 Scope
and Costs
Petition
Scope
Variance
Capital Cost £61M £105M £44M
Loan Charges £2.5M pa rising to
£4M pa by year 40
£4.7M rising to
£7.3M pa by
year 40
£2.2M
rising to
£3.3M
Yr 1 Subsidy £1.2M £1.6M £400K
Total Yr 1 Cost £3.7M £6.3M £2.6M
Total Borrowing
Costs (40 years)
£118M £213M £95M
Visitor Numbers 380,143 459,376 79,233
4.6 While the September 2024 capital cost is below the £90m which remains
allocated to PH2O, the balance of funding would also contribute to delivery of
other elements of the leisure assets review including sustaining and
maintaining other leisure facilities in Perth and Kinross and transforming Bell’s
Sports Centre.
Page 7 of 162

Page 8

4.7 Comparison of the facilities mix requested by the petitioner and the decisions
of Council through the Perth city integrated investment plan.
Petition request Existing Council
decision
Comparison
Dedicated Leisure
Pool/Water with flumes,
kids water play park
(Similar to the current
Monkey Jungle at Perth
Leisure Pool)
Agreed:
- 8 lane training pool
timetabled for
leisure swimming
- Toddler splashpad
Future decision:
- Officers to bring
back options for
leisure water as
part of next stage
of design work
Full comparison not
possible as options for
leisure water being
developed
25m six or eight lane
training pool
25m 8 lane training pool Met
No request for teaching
pool
12.5m x 8.5m Teaching
Pool
Additional to petition
requests
Ice Rink/Hall Engage with curling/
community groups to
explore interest in a user-
led ice sports facility at
Dewars Centre.
Both options provide for
maintaining ice sports in
Perth, with the agreed
option aligning with
Council approach to
empowering communities
to deliver.
Large commercial Gym
(Similar to the
arrangement at Bell's
Sport Centre before
closure)
Fitness gym Met
Fitness studios 3 x flexible use studios Met
Sports hall Games hall Met
Bowling hall/ Events hall
capable of holding events
currently held at Dewars
No indoor bowling –
previous decision of
Council based on low
user numbers
No specific events hall
space
Point of difference
Page 8 of 162

Page 9

5. Conclusion
5.1 The professional and technical advice from officers is that reinstating the
original OBC would face the same overall project affordability challenge which
led to Council deciding to pause and review the project in 2023, and more so
due to the increased estimated costs. The decision of Council in September
2024 to site PH2O at Thimblerow as part of the Perth city integrated
investment plan remains the most cost-effective solution, making the project
affordable, optimising the use of our Perth city estate to deliver better value to
our communities, and supporting opportunities to invest in the wider leisure
estate in Perth and Kinross.
Page 9 of 162

Page 10

Page 10 of 162

Page 11

PERTH AND KINROSS COUNCIL
26 February 2025
Petition: Save our Rural Libraries
Briefing Report by Strategic Lead – Economy, Development and Planning
(Report No. 25/35)
1. Purpose
1.1 The purpose of the report is to provide an update to Council in response to the
petition.
2. Background
2.1 Perth and Kinross Council and Culture Perth and Kinross (contracted to
deliver library services on behalf of the local authority), recognise the
importance of library services in our local communities.  Satisfaction rates are
consistently above 90% and the social impact and alignment with local
priorities are valued. 
2.2 However, the costs of providing these services have risen.  Almost all service
activity is free at the point of use, there are limited opportunities to generate
additional income, and the majority of external funding does not support core
operating costs.  As the Council has received no additional funding to support
library services, Culture Perth and Kinross have in turn received no uplift in
their annual support.
2.3 Every effort has been made to avoid this impacting on frontline services,
including reductions in staffing, corporate, management and supplies and
services budgets.  However, there are now no further savings to be made in
these areas and as such we are required to reduce our frontline provision.
2.4 Perth and Kinross Council chaired a Review of Library Services between
January and September 2022.  A Project Board was established which
included representation from both the Council and Culture Perth and Kinross.
An online survey, promoted through social media, distribution of posters and
leaflets, links in local shops and community venues and Community Councils,
received 1,313 responses.  Additionally, focus group sessions with interested
parties were held in AK Bell Library, Strathearn Community Library,
Blairgowrie Library, Breadalbane Community Library and Loch Leven
Community Library.
2.5 The recommendation of the review (‘to consolidate library provision’) was
agreed by Council in December 2022 as part of a paper on the future of ALEO
services. 
Page 11 of 162

Page 12

2.6 When setting the budget in 2023, the Council gave additional resources
(£173k) to Culture Perth and Kinross on a non-recurring basis.  This reflected
the delay in the implementation of the review.
2.7 In the budget process of 2024, the Council again gave additional resource
(£197k) to support during the review period.
2.8 Work began on implementation in June 2024, led by Culture Perth and
Kinross.  A survey seeking information from 5 library communities, Scone,
Auchterarder, Alyth, Comrie and Birnam, on what their thoughts were on
alternative models of provision was distributed in August 24 – running until the
end of September 24.  The survey received 1,566 responses. As only one
questionnaire per member household was sent, this number represents 3,489
members using the libraries in question. 
2.9 Following the survey, meetings were set up in each community to discuss the
financial context for the need for change, the current data around use and
engagement, survey findings and what a future offer may look like. 
2.10 The strong views held by communities on these proposed changes is
acknowledged, as is the recognition of the need for either additional recurring
resources or alternative models of delivery.
2.11 Perth and Kinross Council and Culture Perth and Kinross have provided
information and data to communities, via Freedom of Information (FOI)
requests and other written communications where requested.
2.12 Culture Perth and Kinross have also shared what an outline offer will look like.
They have committed to support communities through the development of
community led services should that be an option they wish to develop.
2.13 As previously mentioned, Perth and Kinross Council and Culture Perth and
Kinross are committed to library services, recognising the importance they
play in our local communities.  Although financial challenges are resulting in
the reduction of the number of libraries, we remain committed to offering high
quality services.
2.14 Following reductions in the number of local library services operated by
Culture Perth and Kinross the following Library offer will be in place.
3. Library Hubs
3.1 There will be 5 Library Hubs in key geographic locations across the region. 
These are Loch Leven Library in Kinross, Strathearn Library in Crieff,
Breadalbane Library in Aberfeldy, Blairgowrie Library and AK Bell Library in
Perth.  Hub libraries will offer both core and enhanced services to include:
 Bookbug and Rhyme Time activities
 School and afterschool book groups to extend reading skills
 Ancestry and local history groups and activities
 Author talks and events
Page 12 of 162

Page 13

 Book groups
 Summer Reading Challenge and reading promotions
 Reminiscence sessions
 Warm spaces
 People’s network computers
 Free Wi-Fi access
 Community group meetings spaces
Hubs will also continue to co-ordinate Books on Wheels (home delivery)
services to housebound individuals within their local communities.
4. Mobile Library and Click and Collect
4.1 Additionally, within each locality which is losing a Culture Perth and Kinross
run library, there will be mobile library stops and a click and collect service
which will enable people to access the public library catalogue locally and
place an order for books which will then be delivered to a local collection
point.
4.2 Work is being undertaken to commission a new mobile library alongside a
smaller more agile delivery van and both vehicles will be used to service
communities across the region.
5. eLibrary Service
5.1 Customers can also access the free online library resources which include:
 eBooks
 eAudiobooks
 eNewspapers
 eMagazines
 eComics
 SCRAN
 Theory Test Pro
 Access to Research
6. Community Engagement and Additional Reader Development Activity
6.1 Books and Resources will continue to be provided to school, and community
groups and deposit collections will be offered to care homes.  There will also
be peripatetic outreach work in each community, delivering Bookbug,
Chatterbooks and book groups.
6.2 Perth and Kinross Council and Culture Perth and Kinross will continue to work
with any groups who wish to deliver their own community library service,
although each request will be considered on a case-by-case basis and
tailored to meet the circumstances of that community.
Page 13 of 162

Page 14

Page 14 of 162

Page 15

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality
___________________________________________________________________
Committee or Board: Perth and Kinross Council
Date of Meeting: 26 February 2025
Report Title: Strategic Planning Update and
2026/27 to 2028/29 General Fund Revenue Budget
Report Number: 25/36
Report Author: Scott Walker, Chief Finance Officer
Organisational Lead: Scott Walker, Chief Finance Officer
___________________________________________________________________
1. Purpose
1.1 This report provides Council with an update on the delivery of its ongoing
strategic transformation and change programme and alignment with the
Medium Term Financial Plan approved by Council in December 2024.
Thereafter the report presents the Council with Provisional Revenue Budgets
for 2025/26, 2026/27 and 2027/28. These budgets include a three year
Council Tax Strategy which seeks to allow the Council to continue its
commitment to achieving its Vision and Corporate Priorities. Focusing on,
tackling poverty and inequality by making decisions which see resources
directed to those in greatest need and the protection of services which deliver
for these individuals, families and communities.
2. Recommendations
2.1 It is recommended that Council:
A. Approves the 2025/26, 2026/27 and 2027/28 Provisional Revenue
Budgets as set out in Appendix B – see paragraph 6.39.
B. Agrees a Council Tax collection rate of 98.25% in 2025/26, 2026/27 and
2027/28 – see paragraph 6.45.
C. Approves the Council Tax bases set out in Table 8 - see paragraph 6.48.
4
Page 15 of 162

Page 16

D. Approves Band D Council Tax levels (see paragraph 6.52) of: –.
 2025/26 – £1,544.05 (final)
 2026/27 – £1.698.45 (indicative)
 2027/28 – £1.800.35 (indicative)
E. Approves a contribution of £106.133 million to Perth and Kinross
Integration Joint Board in the 2025/26 Provisional Revenue Budget –
see paragraph 6.67.
F. Maintains a prudent approach to the application of Reserves, in line with
the Council’s Financial Principles, and earmarks the General Fund
balances of £43.174 million identified in Appendix G – see paragraph
7.11.
G. Approves that uncommitted Reserves are maintained at between 2%
and 4% of the 2025/26 Revenue Budget which equates to £9.985 million
to £19.970 million – see paragraph 7.18.
3. Structure of the Report
3.1 This report is structured over the following sections:
4. Background and Context
5. Scottish Government Budget
6. 2025/26, 2026/27 and 2027/28 Provisional Revenue Budgets
7. Reserves Strategy
8. Risk Assessment
9. Conclusions
10. Impact Value Assessment
11. Appendices
4. Background and Context
4.1 The Council first approved the 2025/26 Provisional Revenue Budget on 1
March 2023 as part of its three-year budget plan (Report No.23/72 refers).
4.2 On 28 February 2024, the Council approved an updated 2025/26 Provisional
Revenue Budget and, for the first time, the 2026/27 Provisional Revenue
Budget (Report No. 24/63 refers). These are the basis for the updated
2025/26 and 2026/27 Provisional Revenue Budgets, and for the 2027/28
Provisional Revenue Budget that is being considered by Council at this
meeting.
Page 16 of 162

Page 17

4.3 The starting point for this year’s strategic planning update and budget process
is the significant service demand pressures which the Council continues to
face in many areas, most notably in social care services.  While there is an
increase in Scottish Government funding, there are also several obligations
aligned to this. In addition, uncertainties around the wider economy of the UK,
including an overall lack of growth, continuing pressures from inflation levels
and changes in Employer National Insurance contributions, mean there is
limited ability to use this additional funding to focus on local needs.
4.4 Those needs include the continued high numbers of people requiring more
and more complex support for older people’s social care, adults with a
learning disability, and young people with additional support needs.
Additionally, we continue to see over 27.000 people living in poverty across
Perth and Kinross, almost 6,000 of them children, with particular challenges
for rural communities and the services required to support them. These
changes in the profile of our residents and the complexities of individual needs
require us to think differently about how we deliver suitable services and as a
result these are all areas in which programmes of service redesign and
transformation are underway. This Council has set out a clear vision and
priorities, which seek to focus on those in greatest need and to transform our
own organisation to best meet the needs of these individuals, groups and
communities.
Transformation and change
4.5 Beyond the measures focused on protecting frontline services for those in
greatest need, the updated 2025/26 Provisional Revenue Budget also seeks
to build on the significant transformation programme which has been
underway in the last two years.
4.6 We have seen our own organisation go through significant change, both
culturally and structurally, while delivering over £11 million to date in savings
(actual and projected) through programmes of consolidation, leadership
reviews, process improvements and cost reductions (see Table 1). The
transformation and change programme, initially approved by Council in June
2022 (Report No. 22/142 refers) continues to be developed and delivered
alongside changes to how we operate and engage with our communities. The
focus is on improving both our operating efficiency and, more importantly,
aligning our available resources to where there is greatest need and working
towards achieving the Council’s vision of a Perth and Kinross where
everyone can live life well, free from poverty and inequality.
4.7 A summary of the savings identified to date is set out in Table 1 (both actual
and projected) which will increase as the Council continues to transform
services. The most recent progress report was provided to the Finance and
Resources Committee on 18 September 2024 (Report No. 24/262 refers). A
full update will follow in April 2025 to the Finance and Resources Committee.
Page 17 of 162

Page 18

Table 1: Transformation and change savings to date
Transformation and change area Savings
Office Estate £2.0m
Tayside Contracts £1.1m
Leadership Review £1.5m
Consolidation £2.0m
Procurement £1.6m
Health and Social Care Partnership £3.0m
Total £11.2m
4.8 A full breakdown of phase two programmes and projects with a short
summary of recent progress is set out in Appendix A. This includes work
carried forward from phase one, such as finance and property redesign, as
well as new projects like digital transformation and zero waste. Officers will
ensure strategic alignment and collaboration with partners as phase two
projects progress. This will include NHS Tayside in future discussions about
support for Health and Social Care transformation. Elected members will be
kept informed through biannual reports to the Finance and Resources
Committee as well as informally at briefing sessions, Leaders’ meetings and
Conveners’ groups.
4.9 To support the delivery of digital transformation at a pace which capitalises on
the development of new technologies, this draft budget includes a proposed
investment of £750,000 by 2026/27 for digital innovation, and in particular
artificial intelligence (AI). This investment will support the development and
implementation of AI tools to streamline operations, enhance service delivery,
and create efficiencies across various teams and service areas.
4.10 By investing in this technology, the Council is ensuring that its AI tools are
safe and appropriate while also providing opportunities for its staff to upskill.
This initiative places the Council’s people at the heart of the transformation,
enabling them to focus on where they can add the most value in their roles.
Additionally, the AI strategic programme will allow the redesign of services,
making them more accessible, efficient, and capable of delivering better
outcomes for citizens, businesses, and partners.
4.11 A failure to support investment in AI may compromise the Council’s ongoing
transformation activities, challenge further organisational savings
opportunities and ultimately impact on how we best deliver services for our
local communities.
4.12 Core to this vision is recognising that the Council cannot continue to deliver in
the same ways that we have in the past, and that our communities are often
best placed to identify and deliver local solutions. This approach recognises
that one size does not fit all and that the Council’s most effective role may be
in facilitating change and empowering communities. Over recent years, we
have increased the opportunities for communities to receive and direct local
funding through Local Action Partnerships and Community Investment Fund
money.
Page 18 of 162

Page 19

We’ve worked with communities on asset transfer opportunities, as well as
supporting and funding community transport and developing models of local
service delivery and management. These continue to be at the heart of how
we seek to work with communities to allow them to shape and where possible,
deliver, manage and own local services and resources.
4.13 The Council’s Medium Term Financial Plan (MTFP) approved in December
2024 (Report No. 24/350 refers) aligns clearly with this approach. The MTFP
set out a longer-term strategy for addressing the financial challenges the
Council faces, while protecting key public services and the Council’s longer-
term planning ambitions. This financial strategy was based on a new Council
Tax Strategy which is reflected throughout the report.
4.14 By agreeing the Council Tax Strategy as a planning assumption, the Council
has avoided the requirement for abortive work to consider and propose
budget cuts that would not be consistent with the agreed Corporate Plan
priorities. It also reduced the anxiety for key stakeholders including service
users, customers, suppliers and staff that has arisen in previous years. The
draft budget for 2025/26 and the indicative budgets for the following two
years, do not include any additional cuts to public sector jobs, demonstrating
commitment to our own workforce and a desire to maintain levels of support
to communities.
5. Scottish Government Budget
5.1 The Scottish Government Budget 2025/26 was published on 4 December
2024 and followed by Local Government Finance Circular 10/2024 on 12
December.
Local Government Finance Circular 10/2024
5.2 Local Government Finance Circular 10/2024 includes the provisional financial
settlement for 2025/26 at an individual Council level. The information provided
in December 2024 only related to 2025/26.
5.3 The Circular provides details of the provisional total Revenue and Capital
funding allocations for 2025/26, as well as the latest information on funding
redeterminations for 2024/25. The Circular also provides details on a range of
business rates measures, including the 2025/26 Non-Domestic Rates
poundage.
5.4 The provisional total funding allocations form the basis for the annual
consultation between the Scottish Government and COSLA ahead of the
Local Government Finance (Scotland) Order 2024 being presented to the
Scottish Parliament. This is currently scheduled for 25 February 2025.
Page 19 of 162

Page 20

5.5 The Circular sets out a national funding package and includes:
 a further £524.9 million of funding has now been baselined as General
Revenue Grant.
 additional General Revenue Grant of £289 million to support local
priorities
 an additional £15 million to support the expansion of Free School Meals
 £125 million for adult social care workers to deliver the Living Wage in
commissioned services
 £10 million to support provision of Free Personal and Nursing care
 an additional £25.7 million to improve pay for early learning and
childcare workers
 an additional £41 million investment to maintain or restore teacher
numbers to 2023 levels
 an additional £28 million for additional support for learning
 £33 million to support the development of people working in children’s
social work
 £40 million to tackle the climate emergency
 an additional £10 million to improve play parks for children
5.6 As has been the case in previous years, Finance Circular 10/2024 also
contained information on revenue funding which has still to be distributed.
5.7 Based on Finance Circular 10/2024, the total Revenue funding being made
available by the Scottish Government to Perth and Kinross Council in 2024/25
is £337.738 million (see Table 2 below).
Table 2: Scottish Government Grant Funding – Perth and Kinross
Council
2025/26 2024/25 Movement
£m £m £m
General Revenue Funding
(includes uplift re teacher numbers)
304.896 269.418
Non-Domestic Rates 63.537 64.514
Ring-Fenced Grants 3.801* 3.806
TOTAL REVENUE FUNDING 372.234 337.738 34.496
Source: Finance Circular 10/2024 – 12 December 2024
*includes £1.834m not yet distributed for Criminal Justice
Finance Circular 8/2023 – 21 December 2023
5.8 The 2025/26 Scottish Government provisional funding allocation of £372.234
million represents a £34.496 million increase in absolute cash terms from the
allocation for 2024/25 (or 10.2%).
5.9 However, the 2025/26 provisional funding allocation includes £27.036 million
where there is an expectation or requirement for the Council to apply funding
for a stated purpose (most notably 2024/25 pay awards and social care (living
wage)).
Page 20 of 162

Page 21

5.10 Therefore, on a like for like basis, the provisional Scottish Government funding
allocation for 2025/26, represents a £7.460 million cash increase (or 2.2%)
over the equivalent position for 2024/25.
5.11 Table 3 summarises the movements in the total funding package from the
Scottish Government to facilitate a comparison of the 2025/26 provisional
allocation with 2024/25 on a comparable basis.
Table 3: Cash movements from 2024/25 and 2025/26 (on a comparable
basis)
£m
2024/25 – Finance Circular 8/2023 337.738
2025/26 – Finance Circular 10/2024 372.234
Year on year cash increase in funding 34.496
Year on year % increase in cash funding +10.2%
Less funding directed to service delivery/commitments (27.036)
£ cash increase (on a comparable basis) 7.460
% cash increase 2.2%
5.12 The Scottish Government has still to allocate some funding to Councils
including the teachers’ induction scheme, discretionary housing payments and
criminal justice social work. Once these allocations are known, the Finance
and Resources Committee will be asked to approve updates to the 2025/26
Revenue Budget.
Implications for the 2024/25 Capital Budget
5.13 Finance Circular 10/2024 also includes provisional Capital Grant allocations
for 2025/26. The impact of these allocations is included within the Strategic
Investment and Capital Budget 2025/26 – 2030/31(Report No. 25/37 refers)
which is on the agenda for this Council meeting.
Non-Domestic Rates
5.14 Finance Circular 10/2024 also includes the Non-Domestic Basic Rate
poundage for 2025/26 of 49.8 pence, no change from 2024/25. Two
additional rates are levied on properties with rateable values over £51,000
(55.4 pence) and £100,000 (56.8 pence) respectively.
Page 21 of 162

Page 22

6. 2025/26, 2026/27 and 2027/28 Provisional Revenue Budgets
Council Tax Strategy - Background
6.1 In approving the latest Medium Term Financial Plan, the Council endorsed a
three year Council Tax strategy based on annual Council Tax increases of
10% in 2025/26 which has been built into the 2025/26 planning assumptions,
and thereafter, indicative increases of 10% in 2026/27 and 6% in 2027/28.
6.2 The Council also agreed to earmark a further 0.25% of Council Tax income
each and every year to support the Capital Budget. This, along with the 1%
agreed in February 2024, applies 1.25% of Council Tax income, each and
every year to supporting the delivery of the Capital Budget.
6.3 The Council has previously approved the application of the Service
Concession Scheme which included the application of £20 million of
Reserves. This meant the application of Reserves over five years, between
2023/24 and 2027/28, with a gap of £4 million emerging in 2028/29.
6.4 Should the Council Tax Strategy be endorsed, this will allow a managed
reduction in the reliance on Reserves, improving the financial sustainability
of the Council. The 2025/26, 2026/27 and 2027/28 Provisional Revenue
Budget includes a proposal to apply £1 million per year, on a recurring basis,
to offset the contribution from Reserves. This proposal releases £6 million of
non-recurring Reserves which will be applied as follows:
 Anti-Poverty Earmarked Reserve - £2 million
 Transformation (including workforce management) - £2 million
 Insurance Fund - £2 million
6.5 It is for elected members to confirm the final 2025/26 Council Tax level and
indicative 2026/27 and 2027/28 Council Tax levels at today’s budget meeting.
However, in approving the Council Tax strategy in December, the Council
provided a direction of travel in terms of its commitment to and the amount of
funding that could be available to protect vital public services for those in
greatest need and delivery of the Council priorities.
Council Tax Strategy - Protecting services for those in the greatest need
6.6 The Council Tax Strategy agreed in the MTFP has also influenced how the
Council’s Executive and Strategic Leadership Team has approached this
year’s budget process. Following on from the direction of travel approved by
Council in December 2024, officers have aligned spending plans to the
Council’s Corporate priorities. Having considered the unrestricted elements of
the additional funding received from the Scottish Government settlement, and
the potential income from the Council Tax Strategy, budget proposals are
focussed on realigning resources to frontline services where there is evidence
of greatest need.
Page 22 of 162

Page 23

As a result, officers have reviewed savings which were previously agreed in
the 2025/26 and 2026/27 Provisional Revenue Budgets which are contrary to
those goals. In particular reductions in Education and Learning and
Children, Families and Justice budgets.
6.7 Social Care is an area of service delivery that is under significant pressure.
There is increasing demand from an ageing population with more complex
needs and an extensive evidence base of an increased need for care and
support across all adult care groups. The updated 2025/26 Provisional
Revenue Budget includes additional funding of £6.7 million designed to meet
increased need and sustain vital care and support services for vulnerable
adults. This is a net pressure. The Integration Joint Board (IJB) will be asked
to consider savings of £4.8 million over 3 years as part of its financial
strategy and budget setting for 2025/26 when they meet in March.
6.8 In agreeing the 2025/26 Provisional Revenue Budget in February 2024, the
Council agreed £4.359 million of reductions in Education and Learning and
£464,000 in Children, Families and Justice.
6.9 Since then, the requirement to maintain teacher numbers at 2023 levels has
been confirmed. This means £2.18 million of the reduction identified for
Education and Learning is no longer deliverable.
6.10 Whilst a saving of £50,000 has already been achieved against the £464,000 in
Children, Families and Young People, officers have assessed that any further
reduction would have a direct and negative impact on the most vulnerable
children, young people and families. Cuts to early intervention provision would
be required to meet the full savings target, leading to statutory crisis
intervention, which may result in costing the Council more in the short,
medium and long term. It is therefore recommended that the remaining
£414,000 should be reinstated.
6.11 Almost 6,000 children in Perth and Kinross are living in relative poverty. For
those households’ poverty creates an additional challenge which impacts on
education and social care need. The Council’s continued focus on working
across our teams and with partners in the Anti-Poverty Taskforce to tackle the
impact and causes of poverty in Perth and Kinross is delivered through the
Tackling Poverty Strategy endorsed by Council in October 2024 (Report No.
24/299 refers). As a result of the approved Council Tax strategy (see section
6.1), it is proposed that £2 million is added to the Anti-Poverty Earmarked
Reserve to allow the Council to invest in initiatives to tackle this important
issue.
6.12 Together these four areas represent a commitment to protecting services for
the members of our communities in the greatest need. However, we recognise
that there are related issues which can, if prioritised for investment, help
reduce future need. That is why, going forward, if possible, the Council should
consider committing additional resources to supporting resilient communities
and growing a greener economy to attract investment and create job
opportunities for residents.
Page 23 of 162

Page 24

Council Tax Strategy Impact
6.13 In summary, confirmation of the Council Tax increases included within Council
Tax Strategy will allow:
 Funding of £6.7 million to protect social care services
 Maintaining almost £2.2 million of teaching capacity
 Protecting over £400,000 of services for children and families at risk
 An injection of £2 million into the anti-poverty earmarked reserve
 Investment of £750,000 in technology/ artificial intelligence to transform
and redesign services
 Capacity to reduce the reliance on non-recurring Reserves, and
therefore improving financial sustainability
 Reallocation of £4 million of Reserves to Transformation and Insurance
Process for Updating the 2025/26, 2026/27 and 2027/28 Provisional
Revenue Budgets
6.14 The Council initially approved the 2025/26 Provisional Revenue Budgets on 1
March 2023, and updated this on 28 February 2024 while also agreeing the
2026/27 Provisional Revenue Budget (Report Nos 23/72 and 24/63 refer). In
doing so, the Council approved expenditure pressures and budget reductions
which are set out in Table 4 below.
Table 4: Council Decisions 1 March 2023 and 28 February 2024
2025/26 2026/27 Total
Expenditure Pressures £4.568m £2.299m £6.867m
Budget Reductions £(7.700)m £8.328m £(16.028)m
6.15 Following the decisions taken on 1 March 2023 and 28 February 2024, the
Council had balanced revenue budgets. This is the starting point for updating
the 2025/26 and 2026/27 Provisional Revenue Budgets and setting the
2027/28 Provisional Revenue Budget for the first time.
6.16 Adjustments to the 2025/26, 2026/27 and 2027/28 Provisional Revenue
Budgets are included in the Executive Summaries set out in detail in
Appendix C.
6.17 The Executive Summaries include an assessment of the potential impact of
budget reductions against the following criteria:
 Fairness – including the potential socio-economic impact on vulnerable
individuals and groups.
 Workforce – including information on numbers of employees affected,
vacancies, staff turnover and fixed term contracts.
Page 24 of 162

Page 25

 Customers – including information on the effect on all customers
/stakeholders (both external and internal).
 Equalities/Diversity – ensuring that any statutory equalities issues are
considered.
 Outcome and Performance – identifying any significant impact on the
Local Outcomes Improvement Plan and/or Service Business
Management and Improvement Plans.
 Climate Change – including positive and negative impact
6.18 The potential workforce implications identified within the Executive Summaries
include vacant posts and will be influenced by turnover. The Council’s positive
and proactive approach to workforce management is designed to mitigate the
impact on its people, including investment in skills for the future, retraining,
support to take on new job roles, career coaching and building resilience.
6.19 Equality and Fairness Impact Assessments for individual expenditure
pressures and reductions were prepared which facilitated the preparation of a
cumulative impact assessment.
6.20 Within Appendix C, there are several adjustments, beyond those that are
contractual or inflationary that merit further commentary.
6.21 The Council has also recently been notified that it should expect to receive
£4.975 million in 2025/26 from the Packaging Extended Producer
Responsibility Scheme (pEPR). This is a fee that some organisations and
businesses will have to pay in respect of the packaging they supply to or
import into the UK market. The income will go directly to local authorities and
is meant to cover the net cost of collecting, managing, recycling and disposing
of household packaging waste.
6.22 The 2025/26 Provisional Revenue Budget has been constructed on the basis
that the funding will be applied as set out in Table 5.
Table 5: Application of Packaging Extended Producer Responsibility
Scheme Funding
£m Comments
Estimated Level of Funding 4.975
Utilisation of Funding
 Existing pressures
 Earmarked Reserve
1.167
1.008
Contribution to known pressure
for loan charges
Earmarked in Reserves to fund
investment in waste/ recycling
initiatives
Page 25 of 162

Page 26

6.23 Work is also ongoing to further demonstrate the level of investment in waste/
recycling services by the Council in previous years that may count towards
this funding.
6.24 The balance of £2.8 million will be retained as a contingency, pending
confirmation of the funding likely to be received towards increased employers’
national insurance contributions.
6.25 Furthermore, as described in section 6, a direct benefit of the Council Tax
Strategy is that £6 million of non-recurring resources becomes available from
2025/26. The Reserves Strategy set out in Section 7, assumes that these
non-recurring resources are applied to support Anti-Poverty Measures,
Transformation and the Insurance Fund (£2 million each).
6.26 The Executive Summaries set out in Appendix C have been subject to
scrutiny by Elected Member Budget Review Groups, which commenced in
December 2024.
6.27 The detailed analysis of these expenditure pressures and reduction proposals
are set out in Appendix C. Total updated expenditure pressures of £22.831
million and total budget reductions of £5.881 million, are summarised in
Table 6.
Table 6: Updated Expenditure Pressures and Budget Reductions
2025/26
£m
2026/27
£m
2027/28
£m
Total
£m
Expenditure Pressures 15.707 4.535 2.589 22.831
Budget Reductions (5.397) (0.133) (0.351) (5.881)
6.28 In setting the 2026/27 Provisional Revenue Budget in February 2024, a
Contingency Budget of £2.384 million remained unallocated. The updated
2026/27 Provisional Revenue Budget assumes that this is applied in full to
support the delivery of Council services and is reflected in Table 7 below.
6.29 The Council Tax Strategy agreed on 4 December 2024 included indicative
Council Tax increases of 10%, 10% and 6% in 2025/26, 2026/27 and 2027/28
respectively. This generates significant income of £5.220 million in 2025/26
and a further £5.873 million and £6.686 million in 2026/27 and 2027/28
respectively which is set out in Section 6, to support the delivery of Council
objectives. The additional income from this decision is set out in Table 7
below.
6.30 This strategy brings us back to levels which would have been realised had we
had the opportunity to increase annual Council Tax at a modest 3% rate over
recent years.
Page 26 of 162

Page 27

6.31 We understand that any increase in Council Tax will have an impact on
residents. However, this strategy is based on a principle that increases are
crucial to ensure that we can continue to provide vital services targeted to
those in greatest need. Our Welfare Rights and Local Taxes Teams will
continue to support residents who are in financial difficulties, and this support
will be promoted as part of public messaging on the final budget decisions
made today.
6.32 On 8 February 2023, the Council approved a change in accounting policy in
relation to Service Concession arrangements (Report No. 23/43 refers). This
included a proposal to apply £20 million over five years (£4 million per year
on a non-recurring basis) from 2023/24 through to 2027/28 to support Council
services. All things being equal this would result in a £4 million gap in the
2028/29 Revenue Budget.
6.33 The Council Tax Strategy provides capacity to reduce reliance on the Service
Concession scheme with a reduction of £1 million each year through to
2027/28. This means that, all things being equal, the recurring funding gap
that requires to be addressed in 2028/29 is £1 million which improves the
financial sustainability of the Council and reduces the size of the opening
deficit in 2028/29.
6.34 Finally, this is the first time the Council has been asked to set the 2027/28
Provisional Revenue Budget. Therefore, in line with the Medium Term
Financial Plan assumptions, an expenditure pressure of £8 million or 3% has
been included in the 2027/28 Provisional Revenue Budget for the cost of that
years pay award. This is factored into the summary of financial capacity/ gap
set out in Table 7.
Table 7: Summary of Financial Capacity/ (Gap)
2025/26
£m
2026/27
£m
2027/28
£m
Additional Funding – see Table 3 (7.460) - -
Executive Summaries – Appendix C 10.310 4.402 2.238
Contingency Budget – paragraph 6.28 - (2.384) -
Council Tax Strategy – paragraph 6.29 (5.220) (5.873) (6.686)
Service Concession – paragraph 6.32 1.000 1.000 1.000
2027/28 Pay Award – paragraph 6.34 - - 8.000
Financial Capacity/ (Gap) (1.370) (2.855) 4.552
6.35 Across all three financial years, Table 7 sets out a financial gap of £327,000
which will require to be addressed over the medium term.
Page 27 of 162

Page 28

6.36 Elected Members are reminded that the position summarised in Table 7, is
based upon the assumption that all expenditure pressures and all reductions
within the Executive Summaries attached as Appendix C, and those in
previous years are approved. In addition, it is based on the Council Tax
Strategy approved by Council on 4 December 2024. Furthermore, this position
is subject to the current known funding available from Government.
6.37 The 2025/26, 2026/27 and 2027/28 Provisional Revenue Budgets have been
prepared based upon the information currently available, both in terms of
financial resources and anticipated service delivery pressures. The analysis
reflects the judgement of Council officers, a focus on Council priorities and
financial principles, however, there is a significant risk that these assumptions
may require to be revised as part of the ongoing monitoring of Council
expenditure and income.
6.38 Finally, the Council is recognised by external auditors for its prudent approach
to financial management. Given the level of uncertainty over the short to
medium term in relation to additional expenditure, reduced income, the
previously approved use of Reserves, and the unknown impact of the cost of
living on local communities and the local economy, Council is advised to
adopt a cautious and prudent approach towards the application of Reserves.
Council has already agreed the principle of not funding recurring activity from
general fund Reserves.
6.39 ACTION: The Council is asked to approve the 2025/26, 2026/27 and
2027/28 Provisional Revenue Budgets as set out in Appendix B –
RECOMMENDATION A.
6.40 The Council is also advised that there may be delays implementing some
additional expenditure proposals, to allow lead in arrangements to be
established. This may result in some activity slipping into future financial
years. Any additional projects introduced through the Revenue Budget Motion/
Amendments, must reflect the Council’s priorities and approved financial
principles, including a focus on need rather than responding to demand and
be based on evidence and data. Delivery of new proposals may also require a
commensurate increase in staffing capacity which may delay implementation
as appropriately skilled officers are recruited.
Council Tax Collection Rate
6.41 In February 2024, the Council agreed a Council Tax collection rate of 98.25%.
This target, whilst challenging, was supported by the Council’s collection
performance over recent years and represents a realistic budgeted collection
over time.
6.42 Elected members receive regular updates on Council Tax collection through
reporting to the Finance and Resources Committee.
Page 28 of 162

Page 29

6.43 Despite the challenges facing households, Council Tax collection is holding
up. It is therefore proposed that the collection rate of 98.25% is maintained for
2025/26, 2026/27 and 2027/28. It should, however, also be noted that there
remains a risk to collection levels due to the economic environment, changes
in legislation in relation to debt recovery and welfare reform. The cost-of-living
challenges and its impact on household incomes may also continue to have a
significant impact.
6.44 It usually takes on average around six years to reach or exceed a collection
level of 98.25%. The Council remains committed to sustaining and improving
performance in respect of all its income recovery activities.
6.45 ACTION: The Council is asked to agree a Council Tax collection rate of
98.25% in 2025/26, 2026/27 and 2027/28 – RECOMMENDATION B.
Council Tax Base
6.46 The number of chargeable band D equivalent dwellings for Council Tax
purposes, the Council Tax base (after adjusting for assumed non-collection of
1.75%), is estimated to be as follows:
TABLE 8: COUNCIL TAX – NUMBER OF BAND D EQUIVALENT
PROPERTIES
2025/26 75,057
2026/27 75,710
2027/28 76,300
6.47 The Council’s tax base is regularly reviewed, based upon an analysis of
recent trends, and adjusted for anticipated growth in the number of dwellings
as well as increases in the number of discounts and exempt dwellings.
6.48 ACTION: The Council is asked to approve the Council Tax bases set out
in Table 8 – RECOMMENDATION C.
Council Tax Rates
6.49 Consistent with the decision of Council on 4 December 2024, the 2025/26,
2026/27 and 2027/28 Provisional Revenue Budgets have been constructed on
the basis of Council Tax increases of 10%, 10% and 6% respectively.
6.50 For illustrative purposes, Table 9 sets out the impact of the proposed
increases on a monthly, weekly and annual basis for a Band D Council Tax
payer.
Page 29 of 162

Page 30

TABLE 9: IMPACT OF COUNCIL TAX RISES
Weekly Increase Monthly Increase Annual Increase
2025/26 £2.70 £11.70 £140.36
2026/27 £2.97 £12.87 £154.40
2027/28 £1.96 £8.49 £101.90
6.51 Any proposal to deviate from this position will have either positive or negative
implications on the Council’s financial position depending on the final decision.
6.52 ACTION: The Council is asked to approve Council Tax levels as follows
– RECOMMENDATION D.
 2025/26 – £1,544.05 (final)
 2026/27 – £1,698.45 (indicative)
 2027/28 – £1,800.35 (indicative)
6.53 The 2026/27 and 2027/28 indicative Council Tax levels will be confirmed
when setting the 2026/27 and 2027/28 final Revenue Budgets in February
2026 and February 2027 respectively.
6.54 Again, consistent with the Council decision on 4 December 2024, 1.25% of
future Council Tax income per year will be ringfenced and applied to
supporting the Capital Budget to ensure delivery of key infrastructure projects
and supporting programmes such as roads, bridges and IT investment.
6.55 In the event that future Council Tax increases are restricted or prohibited, a
corresponding amount from the Revenue Budget would be applied to Loan
Charges in order to ensure the sustainability of the Capital Budget in the
medium and longer term.
Fees and Charges
6.56 The proposals set out in Appendix C include the financial implications of
increases to existing levels of charges in 2025/26. Full details of
recommended charges for 2025/26 are set out in Appendix D.
6.57 The annual review of charges considers several factors including an
assessment of previous year’s income levels, trends in user demand,
inflationary pressures, savings targets, alternative charging structures and the
potential impact on vulnerable groups.
Page 30 of 162

Page 31

6.58 All fees and charges should be set in line with the approved individual
charging policy and fall into one of the following categories set out in Table 10
below.
Table 10: Charging categories
Charging Strategy Objective
Commercial Charges The Council aims to cover the cost of
providing the service and make a surplus.
Full Cost Recovery The Council aims to cover the cost of providing
the service from those who use it.
Subsidised The Council wishes users of the service to
contribute to the costs of providing it. This
might meet a service objective or allow
competition with other providers.
Free The Council chooses to make the service
available at no charge to meet a service
objective.
Statutory Charges are determined in line with legal
requirements.
Perth and Kinross Integration Joint Board
6.59 The Public Bodies (Joint Working) (Scotland) Act 2014 introduced joint
working with NHS (Tayside) in the form of an Integrated Joint Board (IJB) for
the strategic planning of community health and social care across Perth and
Kinross.
6.60 The Perth and Kinross IJB has an approved Strategic Plan for 2024-2027 and
a series of Strategic Delivery Plans to deliver on its objectives for vulnerable
adults who rely upon community health and social care for daily living. The IJB
has issued directions to the Council to deliver social work and social care
services for adults which are in line with integration principles for community
health and social care, and, to support transformation in key priority areas
such as older people services including care at home; expansion of support
and independent living for people with a learning disability service and
securing better outcomes in community mental health and wellbeing.
6.61 The IJB approved a financial strategy for 2024-2027 which includes a drive for
greater efficiency and transformation to build best practice in health and social
care provision and ensuring an integrated, whole system approach to meeting
needs and improving outcomes.
6.62 The Council’s Executive Leadership Team continues to support
transformational approaches aimed at building on best practice in health and
social care provision.
Page 31 of 162

Page 32

6.63 The Local Government Finance Circular, 10/2024 issued on 12 December
2024, confirmed that funding would be provided to increase the Living Wage
for adult social care workers in commissioned services, and to increase the
rate of Free Personal and Nursing Care.
6.64 The 2025/26 Provisional Revenue Budget assumes the Council will pass on
its full share of the funding of £4.273 million as provided for in the local
government funding settlement from the Scottish Government.
6.65 The IJB Budget will be based on receiving an uplift of £6.7 million to address
pressures arising from the increasing needs of the population, which is
included in the Council 2025/26 Provisional Revenue Budget. This will support
the mid-level scenario planning assumed by the IJB. There is a risk that these
assumptions are underestimated.  The realisation of the high-level scenario
would require a further £4.3 million in 2025/26. In addition, the Adult Social
Care sector in Perth and Kinross faces significant risk due to unfunded
increases to employer National Insurance contributions. This could result in
financial instability, service closures, and workforce challenges and officers
continue to engage in national discussions to highlight the scale and impact
on commissioned care providers. At this stage work remains underway on the
IJB Budget for 2026/27 and 2027/28.
6.66 The IJB is scheduled to meet on 19 March 2025 to consider its budget for
2025/26. This budget will consider the funding received from each Partner
Body alongside the pressures which have been identified for 2025/26. The IJB
will require to make decisions in relation to savings to deliver a balanced
budget for 2025/26. Until both partners have confirmed their 2025/26 Revenue
Budget, there is a risk to the delivery of the IJB Strategic Plan.
6.67 ACTION: The Council is requested to approve the contribution of
£106.133 million to Perth and Kinross Health and Social Care
Partnership in the 2025/26 Provisional Revenue Budget –
RECOMMENDATION E.
Scottish Water Charges
6.68 The Council has received notification from Scottish Water that domestic water
supply and waste water collection charges for 2025/26 will increase by 9.9%.
This results in a band D equivalent charge for water and waste from Scottish
Water of £600.39, an increase of £54 (£546.39 in 2024/25).
6.69 Scottish Water charges for water and wastewater continue to be charged
using the Council Tax multiplier that was in place prior to 1 April 2017.
7. Reserves Strategy
7.1 In accordance with the existing statutory and regulatory framework, the Chief
Finance Officer, as Responsible Financial Officer (or “Proper Officer”), is
responsible for advising the Council on the level of Reserves it should hold.
Page 32 of 162

Page 33

7.2 In determining Medium Term Financial Plans and preparing budgets, the
Council needs to consider the establishment and maintenance of Reserves in
accordance with its statutory powers. Reserves can be held for three main
purposes:
 Working balances to help cushion the impact of uneven cash flows and
avoid unnecessary temporary borrowing – this forms part of General
Reserves.
 A contingency to cushion the impact of unexpected events or
emergencies – this also forms part of General Reserves.
 A means of building up funds often referred to as Earmarked Reserves,
to meet known or predicted liabilities.
7.3 LAAP Bulletin 99 also provided guidance on the further categories of
Earmarked Reserve that the Council is permitted to hold including insurance,
unspent grants and school balances.
7.4 The audited 2023/24 Annual Accounts included £83.794 million of General
Fund Reserves. More details on the levels of cash backed Reserves are set
out in Appendix E. When the earmarked Reserves of £65.083 million (see
Appendix G) were removed, there was an uncommitted balance of £18.711
million which equates to 4% at 31 March 2024.
Proposals to Earmark Reserves
7.5 Revenue Budget 2024/25 - Update No 3, which was considered by the
Finance and Resources Committee on 5 February 2025 (Report No. 25/24
refers), included the projected outturn for the Council’s 2024/25 General Fund
Revenue Budget. These projections have been further refined to recognise
several adjustments which are required in closing the Council’s 2024/25
Annual Accounts and represent material changes to the projected outturn.
7.6 The impact of these projections on the level of balances is summarised in
Appendix F, which indicates a projected General Fund (excluding HRA)
balance of £61.403 million at 31 March 2025. Of this projected balance,
£43.174 million is earmarked for the specific purposes as set out in
Appendix G with a projected uncommitted balance of £18.229 million.
7.7 As is the case in previous years, there remain some areas of uncertainty in
relation to the projected level of balances at 31 March 2025 including the final
impact of weather-related events or additional grant income.
7.8 Based on the Council’s existing financial and policy commitments and the
work undertaken in preparing the Provisional Revenue Budgets, it is proposed
that the amounts included in Appendix G be earmarked against the projected
General Fund balance.
Page 33 of 162

Page 34

7.9 The balances of £43.174 million identified in Appendix G above and
described in more detail in Appendix H will be monitored as part of the
revenue monitoring process. Any proposals to make use of the balances will
be subject to approval by either the Finance and Resources Committee or
Council.
7.10 Subject to approval of the revised application of £6 million of Service
Concession funding as described above, this would result in movements to
the following earmarked Reserves which would come into effect on 1 April
2025 –
 Anti-Poverty Measures – updated balance - £2.985 million
 Transformation and Workforce Management – update balance of £6.855
million
 Balance of £2 million has been applied in the 2025/26 Provisional
Revenue Budget as a contribution to the Insurance Fund
7.11 ACTION: The Council is asked to maintain a prudent approach to the
application of Reserves and earmark the General Fund Balances of
£43.174 million identified in Appendix G – RECOMMENDATION F.
Proposed Approach to Managing Unearmarked General Fund Reserves
7.12 To assess the adequacy of unearmarked General Fund Reserves, it is
necessary to take account of the strategic, operational and financial risks
facing the Council, which are set out in Section 8 of this report.
7.13 In addition, Councils are expected to retain the equivalent of 0.2% of their
annual Net Revenue Budget to deal with unforeseen emergencies (£845,464
in 2024/25 for Perth and Kinross Council) before being eligible for support
through the Bellwin Scheme.
7.14 Taking account of all the risks and historical experience in Perth and Kinross
since 1996, it is recommended that the targeted level of uncommitted non-
HRA General Fund Reserves continues to be in the range of 2% to 4% of the
Council’s Net Revenue Budget in the medium term.
7.15 Based on the Net Provisional Revenue Budget for 2025/26 of
£499.273million as detailed in Appendix B, this would mean a level of
uncommitted Reserves of between approximately £9.985 million and £19.970
million for 2025/26.
7.16 The Council has targeted a level of uncommitted Reserves between 2% and
4% range for several years. Whilst this range is still considered to be
appropriate, it should be noted that the level of risk involved in managing the
Council’s Revenue Budget is significant. There is currently no confirmation of
the Council’s Scottish Government funding beyond 2025/26 and it is
anticipated that Council services will continue to operate in a challenging
financial environment in future years.
Page 34 of 162

Page 35

7.17 Based on the level of Earmarked Reserves of £43.174 million as set out in
Appendix G, the level of unearmarked Reserves is £18.229 million which
equates to 3.65%.
7.18 ACTION: The Council is asked to approve that uncommitted Reserves
are maintained at a minimum of 2% to 4% of the 2025/26 Net Revenue
Budget which equates to £9.985 million to £19.970 million –
RECOMMENDATION G.
7.19 In the event that any use of General Fund Reserves is made in determining
the 2025/26, 2026/27 and/or 2027/28 Revenue Budgets, this should only be
done on the basis of a sustainable strategy, which ensures that future years’
Revenue Budgets are not dependent upon the continuing use of Reserves.
7.20 Appendix I to the report shows the contributions to and from Reserves
recommended in setting the Provisional Revenue Budget for 2025/26 and
anticipated in 2026/27 and 2027/28.
8. Risk Assessment
8.1 Determining the Revenue Budget and Reserves Strategy requires
consideration of the strategic, operational and financial risks potentially facing
the Council. The General Fund Reserves Strategy is integral to supporting the
Council’s approach to the management of financial risk. Both the uncertainty
of future events and resource constraints make it impractical to mitigate
against all potential risks. In developing its medium-term financial plan, the
Council must also be aware of the sustainability of its expenditure proposals.
Significant risks, which are of relevance are outlined below.
8.2 The Medium Term Financial Plan that was agreed by Council on 4 December
2024 (Report No. 24/350 refers), included an analysis of the risks that may
impact on the Council both now and in the future as included:
 Local Government Funding
 Expenditure Pressures
 Council Tax
 Perth and Kinross Integration Joint Board and funding to support social
care
 Inflation
 Current Economic Climate
 Demographics
 Climate Change
 ALEOs
 Severe Weather
8.3 The Medium Term Financial Plan also included commentary on future pay
awards. The Council has budgeted for an increase of 3% in each of the next
three financial years for all staff groups.
Page 35 of 162

Page 36

8.4 The pay claim for 2025/26 only, for non-teaching staff groups was received in
late January and included a request for an uplift of 6.5% across all spinal
column points. Without additional funding, this represents a significant risk to
the Council’s finances.
8.5 At this time there is still limited clarity on funding that may be available to
mitigate the impact of the increase in Employers’ National Insurance
Contributions of approximately £5.5 million.
8.6 The Scottish Government has indicated that £144 million (60%) has been
made available nationally for Councils’.  The allocation of this funding will not
be known until after the Council sets the 2025/26 Revenue Budget.
8.7 Furthermore, there is no information on whether there will be additional
financial support to contribute towards the additional costs incurred by the
Council’s ALEOs, Tayside Contracts, social care providers and third sector
organisations providing statutory services on behalf of the Council.
8.8 Funding of £2.8 million has been allocated within the 2025/26 Provisional
Revenue Budget to contribute to this pressure, but, at this stage, there is no
certainty that this will be sufficient.
8.9 Elected members will be kept up to date on the impact of these risks through
the revenue monitoring reports that are presented to the Finance and
Resources Committee.
9. Conclusions
9.1 This annual Strategic Planning and Budget report is a key pillar of the
Council’s commitment to achieving its organisational Vision and Corporate
Priorities. The report and the work in developing it, is about more than
balancing income with spending and cost pressures. It is a confirmation of
commitment to delivering on the strategic priorities and vision set out in the
Corporate Plan. It is a statement of commitment to tackling poverty and
inequality whilst continuing to support and resource the Council's ongoing
organisational change.
9.2 The 2025/26, 2026/27, and 2027/28 Provisional Revenue Budgets have been
prepared in that context – balancing financial sustainability with protecting
services which support those in the greatest need.
9.3 Whilst the Scottish Government's funding allocation for 2025/26 represents a
cash increase, much of this is directed towards specific commitments, and
financial challenges remain which require choices to be made about how the
Council’s resources are allocated.
9.4 The Council's prudent approach to Reserves management ensures a buffer
against financial uncertainties, while Earmarked Reserves support targeted
initiatives.
Page 36 of 162

Page 37

The Council is advised to maintain a cautious approach, ensuring that future
budgets are not overly reliant on Reserves and that financial planning remains
adaptable to changing circumstances.
9.5 Overall, this report shows that while the financial challenges are significant,
by: 
 focusing on strategic priorities,
 investing in innovation, and
 ensuring prudent financial management,
we can:
 continue to deliver services for people with the greatest need,
 protect frontline jobs and
 place communities at the heart of future delivery.
9.6 The report is a continuing commitment to Working together towards a Perth
and Kinross where everyone can live life well, free from poverty and
inequality.
10. Impact Value Assessment
10.1 The impact value assessment can be found here –
Impact Value Assessment - Strategic Planning and Revenue Budget Report
11. Appendices
A. Transformation Update
B. 2025/26, 2026/27 and 2027/28 Provisional Revenue Budgets
C. Executive Summaries
D. 2025/26 Fees and Charges
E. Summary Cash Backed Reserves – 2023/24 Actual and 2024/25
Projected
F. Projected General Fund Balance at 31 March 2025
G. Earmarked Reserves at 31 March 2025
H. Summary of Earmarked Reserves at 31 March 2025
I. Summary of Projected Use of General Fund Balances 2025/26, 2026/27
and 2027/28
Page 37 of 162

Page 38

Page 38 of 162

Page 39

Appendix A
Transformation and Change Programme – Phase Two Programme Update
Project Title Project Overview and expected
outcomes
Progress Update / Key Milestones
Customer
Services
Consolidation
To develop a new model for customer
services by adoption of a customer-
centric approach to customer contact
management which will substantially
simplify our current arrangements;
enrich jobs and empower customer
service staff to satisfy most requests
at first point of contact. The model will
provide the opportunity to blend digital
customer channels, assist vulnerable
citizens by an appropriate channel,
operate more effectively in and across
localities, to achieve more with less
resources, less effort, and less
bureaucracy. 
We carried over some final actions of
the consolidation of customer services
into phase two, for example moving
housing repairs customer service to
consolidated service and ensure
training programmes are in place for
this transition. Further development of
customer service programme for all
PKC employees – following on from
‘Eyes and Ears of PKC which will align
with our cultural change programme. 
Leadership
Phase 2
Finance
Consolidation
The programme will pick up on the
Leadership Phase one work including
the senior leadership restructure,
consolidation of key corporate
services and cultural change.
Carrying over consolidation into full
service redesign projects in areas
such as Strategy, People and
Performance, Finance & Business
Support and Property. Includes
organisational cultural change
programme including workstreams to
strengthen the five foundations of
leadership. 
Key workstreams are being progressed
and on track in terms of workforce
planning and service redesign with
workshops and support being provided
to ensure consistency and progress. 
Full cultural change plan for phase two
is in development after the success of
the Employee Offer Experience and
Leadership Development initiatives.
Working
Smarter 
The Working Smarter programme has
a number of different projects all
related to the strategic and integrated
approach of people, technology and
crucially, property – looking to improve
how we integrate all three for the best
outcomes in relation to facilitating
better productivity, embracing
technology, more effectively using our
estate and buildings and enhancing
employees experience through
flexible operating models. 
This programme includes all of the work
which has been underway to secure
Pullar House as a hub for different
organisations and looking at how we
purchase this property with a view to
taking over from September 2025.
Members will be fully aware of detailed
progress in this area.
In addition, the project team have also
been working on a number of other
projects including the planning and
refurbishment of other city centre office
space with a consultant appointed to
agree a scope and set out options. A
project to take forward the ownership
and associated actions around Kinnoull
St Car Park which requires agreement
4
Page 39 of 162

Page 40

on policy for parking as well as
considering other aspects of this
property. This project also covers all of
the Hybrid working arrangements in
place and the communication and
engagement required to implement and
embed.   
Digital
Transformation
This programme of work consists of
two main projects: 1. Artificial
Intelligence (AI) which is intended to
position PKC at the forefront of digital
transformation, driving efficiency,
enhancing service delivery and
fostering innovation.  2. Business
Systems Rationalisation to review all
council business systems and
applications and give an overview of
current management arrangements,
resources required, support and
development needed and make
recommendations for a new Digital
operating model in future. 
The AI project is underway and a full
EM briefing is scheduled for 10 March
2025. A pilot has been carried out,
extensive training has taken place with
Senior Officers and agreement for
further pilot licences in selected teams
is being rolled out.
In relation to the business systems
rationalisation project, this has been
ongoing since mid 2023 with all
baseline evidence collated and
workshop sessions with system owners
ongoing. It also encompasses the
FLARE system replacement
workstream and this is now at the
design stage with timescales being met
on progress.
Additional
Support Needs
To transform ASN provision in
education to deliver best value linked
to best practice, establish clear ASN
pathways, develop availability of ASN
provision at all levels across all areas
of the authority, create capacity for
increase of future PKC placements,
reduce the number of pupils placed
out with PKC ASN provision, design a
sustainable transport process, and
provide regular reporting to help
monitor the financial position, help to
comply with legal requirements placed
on the local authority, and ensure
quality provision is delivered. 
This is a five year programme with fully
developed workstreams and a number
of actions currently in progress. Regular
meetings with our PMO has established
clearly defined outcomes and critical
success factors with a planned
completion date of 31 October 2028.
The project is currently in the
‘Discovery’ phase with most current
workstream tasks due for completion in
the spring. In line with our service
design approach, we will shortly move
to the design and delivery stage 
Whole Family
Wellbeing
programme
The WFWB programme will ensure an
increase in universally accessible
early help and support, delivered
where and when it meets families'
needs.  Aiming for a better collective
awareness of available support and
how to access it, for both families and
professionals, it will aim to provide
support as "joined up" and limit the
number of professionals and services
individually involved with families. It
will also look to provide families with
choice about support ensuring they
This project has been ongoing since
mid 2023 and has also been the subject
of an Elected Member briefing in
November 2024 which allowed for
discussion on progress and ongoing
workstreams. There are five
established workstreams already
making good progress with positive
outcomes being experienced including; 
1. Children and families at the
centre (engagement,
empowerment, co-design)
Page 40 of 162

Page 41

are involved in decisions that affect
them and that there is increased
collaboration between services and
organisations that support families
(including adult services and third
sector).
Encourage increased engagement
with, and participation from children,
young people and families in
designing and developing services
and support, ensuring a clear and
shared understanding of the needs of
families across the whole system
Embed the key principles of holistic
family support and early intervention
and prevention within structures and
systems (stigma-free, needs-based,
rights-led), encouraging and
empowering staff to develop
innovative family support solutions in
conjunction with the families they
support.
Improving capacity within the
workforce to respond to the needs of
families in a holistic way, through
effective signposting and support. 
2. Access to services (mapping of
service provision, FORT referral
system and development of
services directory)
3. Service delivery (upscaling
existing services, developing
new services and influencing
partners)
4. Systems leadership (links with
other policy areas and funding,
culture, vision, sharing good
practice)
5. Support for the workforce
(training, capacity building,
developing networks and
upskilling) 
Public Transport To develop a plan for a transport
model that meets the needs of all our
communities which is affordable,
sustainable, efficient and effective.
This model will cover the provision of
local bus services, mainstream home
to school transport, ASN home to
school transport, HSCP and children
and families transport. 
This project is on track and a number of
workstreams progressing.
A Project Steering Group has been
implemented and consultants appointed
who are undertaking a baseline
assessment of current needs, taking
into consideration feedback from
stakeholders and communities. There
are also a number of workshops
scheduled to ensure that all areas of
PKC who deal with transport
(education, children’s services etc) are
included, and a strategic approach is
being adopted. 
Community
Engagement
Combining the multi-disciplinary
locality working (MDLW) programme
and our community engagement
transformation project to strengthen
the efficiency and effectiveness of
community engagement and
empowerment across the Council.
This will allow us to find new ways for
the Council to deliver services in a
more joined up and flexible way, being
more responsive to the needs within
local communicates. Working together
in partnership to address needs of our
There are a number of workstreams
within this project and the MDLW has
been ongoing for some time and
making good progress with Scottish
government funding awarded, current
recruitment for a new project manager
underway and a renewed focus in
terms of workstreams. In addition,
workshops are being held to start
planning a new community engagement
aspect which builds on the foundations
of all of the involvement and
participation with communities, families
Page 41 of 162

Page 42

communities with a clear focus on
early intervention and prevention will
allow us to keep working to tackle
discrimination and prejudice,
promoting equal opportunities for all
and creating a fairer P&K. 
and individuals which is part of the
Councils day to day role.  A workshop
was held in early Feb to develop plans
for an inclusive engagement event in
March 2025 to determine a strategy
and action plan moving forward over
the next few years. 
Employability To develop an implementation plan to
deliver a strategic and co-ordinated
employability service for PKC.
Designing a new model that makes
best use of the current expertise, skills
and resources to ensure a more
cohesive and effective service. This
will involve maximising the reach and
impact of our collective resources and
delivery of services and operating in a
more connected and integrated way
putting people and their needs at the
centre of the redesign. 
This project is on track in relation to
research, baseline data and
benchmarking work. There is still some
progress to be made in relation to our
engagement and redesign workstreams
which will get underway in February
2025 with a designer’s workshop and
will be followed on with a full design
event before the end of the financial
year. 
Zero Waste &
Operations
A review of waste strategy and waste
management arrangements to deliver
national initiatives, improved
outcomes and realise best value and
service efficiencies. This programme
has a number of workstreams
including: Operations resourcing;
commercialisation review; circular
economy strategy and service design
beyond twin stream; schools recycling
improvement, fleet transformation and
operational asset review. 
This is a phase two project which was
initiated in 2024 once the new Strategic
Lead and key senior manager roles
were all in place with induction
underway. A project proposal form has
been developed with Project Managers
taking forward action plans in the
various workstreams. The
commercialisation project is on track
and some short term service
improvement has already been
identified as well as savings in other
areas of the programme. A full
scheduled workplan is currently being
developed with realistic timescales and
milestones being identified. 
ALEO Review
Project
To find the best model of delivering
leisure and culture services to people
across Perth and Kinross within
current financial climate.
• To recommend a future
delivery model best suited to
future needs for ALEO’s that is
capable of:
Optimising PKC investment in
leisure and culture services.
• Increasing back-office
efficiencies, including with
other partners where
appropriate (for example Perth
and Kinross Heritage Trust,
This project is on track with the
following progress being made: 
Joint Project Group in place with
representation from all ALEO’s and a
collaborative approach to the review
and workstreams associated
An options appraisal of new structural
model for ALEO’s looking to secure
future financial sustainability is due to
be started late March 2025 
Regular updates and reports to full
Council with an options appraisal and
recommendations due in September
2025.
Page 42 of 162

Page 43

Pitlochry Festival Theatre).
Growing and diversifying new
income streams.
• Recommending an appropriate
constitutional/governance
structure for any new delivery
model on the basis of options
appraisal (sole member, SCIO,
mutual etc). 
Tayside
Contracts
Review
The review will consist of looking
across the whole Tayside Contracts
portfolio and reviewing the efficiency
and effectiveness of service provision,
delivery and considering alternative
options. 
This project is part of our phase two
programme, from late 2024 and is
currently being developed with a
number of significant areas of work to
be considered and explored including:
SLA Review, (soft services – school
meals, cleaning, crossing patrollers,
facilities management, roads and
flooding. Progress will be reported as
part of Transformation & Change
updates. 
Commissioning
& Procurement
Consolidation
(Third Sector
Review)
To design and implement a new
operating model for strategic
procurement and commissioning to
improve efficiency and optimise the
value and benefits of our purchasing
power. 
Helping us to better align spend with
need and address pressures of
changing demands. 
Optimising the public value of the
procurement function and
consolidated relevant skills and
expertise across the organisations. 
This project is reporting the following
achievements to date:
• New five-year Sustainable
Procurement Strategy approved
• Design of new “test of change”
operating model
• Contract and Supplier
Management Toolkit
implemented
• Digital Category Strategy
developed (awaiting
Procurement and
Commissioning Board approval)
• Plans in place to develop
Business Partnership model
• Development of PowerBI
reporting tools (Spend Analysis
and Management Information
Platform Scotland (MIPS))
• Schools Savings Working Group
created to work on delivering
cost savings and efficiencies. 
Completion of a number of mini-
projects under this including
janitorial supplies product
rationalisation and award of
commitment contract.
• Identification of £30k of savings
related to third sector funding. 
Page 43 of 162

Page 44

Page 44 of 162

Page 45

Appendix B
PROVISIONAL REVENUE BUDGET
2025/26 2026/27 2027/28
£000 £000 £000
Education and Learning 179,085 176,767 177,014
Children, Families and Justice 24,415 24,504 24,594
Economy, Development and Planning 13,564 13,233 13,233
Environment and Infrastructure 30,835 31,315 31,555
Housing and Communities 16,764 16,034 16,012
Directorate Core Costs 504 504 504
Finance and Business Support 8,411 8,411 8,411
Legal and Governance 5,029 4,934 4,934
Property Services 65,428 65,895 67,644
Customer and Digital Services 12,159 12,047 12,128
Strategic Planning, People and Performance 5,805 5,024 5,024
Projects and Programmes 518 225 225
Health and Social Care 106,133 106,133 106,133
Sub-Total: Service Budgets 468,650 465,026 467,411
Corporate Budgets
Contribution to Valuation Joint Board 1,421 1,421 1,421
Capital Financing Costs 18,614 20,758 23,012
Interest on Revenue Balances (3,936) (3,408) (3,042)
Contribution to Capital Fund 5,331 4,803 4,437
Contribution to Insurance fund 4,000 2,000 2,000
Tayside Contracts Surplus (550) (550) (550)
Support Service External Income (2,323) (2,403) (2,403)
Contribution to Tayside pension fund 1,711 1,711 1,711
Discretionary Relief 1,104 1,104 1,104
Apprenticeship Levy 956 956 956
Council Tax Reduction Scheme 7,400 7,400 7,400
Corporate Savings (Leadership / Procurement) (305) (1,430) (1,430)
Pay 0 7,999 15,999
National Insurance Funding (2,800) (2,800) (2,800)
Sub-Total: Corporate Budgets 30,623 37,561 47,815
Net Expenditure (General Fund) 499,273 502,587 515,226
Financed By:
Council Tax (115,893) (128,592) (137,368)
Council Tax Second Home / Long Term Empty
Properties (3,338) (3,338) (3,338)
Council Tax Single Person Discount (300) (300) (300)
Total Revenue Funding (370,400) (370,400) (370,400)
Capital Grants (1,600) (1,600) (1,600)
Balances (3,112) 2,418 2,107
Service concession (6,000) (5,000) (4,000)
Provisional Budget (1,370) (4,225) 327
Headroom applied 1,370 4,225
(Headroom)/Gap (1,370) (2,855) 4,552
4
Page 45 of 162

Page 46

Page 46 of 162

Page 47

PERTH KINROSS COUNCIL
REVENUE BUDGET 2025/26 TO 2027/28
EXECUTIVE SUMMARIES
Appendix C
Pressures
£'000
Reductions
£'000 FTE
Pressures
£'000
Reductions
£'000 FTE
Pressures
£'000
Reductions
£'000 FTE
Tackling poverty 54 0 0.0 22 0 0.0 56 0 0.0
Tackling climate change and supporting sustainable places 1,839 4,975 0.0 (475) 0 0.0 (356) 0 0.0
Developing a resilient, stronger and greener local economy 55 0 0.0 0 0 0.0 0 0 0.0
Enabling our children and young people to achieve their full potential 1,306 0 0.0 3,562 0 0.0 1,405 0 0.0
Protecting and caring for our most vulnerable people 6,800 0 0.0 514 0 0.0 50 0 0.0
Supporting and promoting physical and mental wellbeing 0 0 0.0 0 0 0.0 0 0 0.0
Working in partnership with communities 336 58 0.0 547 133 0.0 1,123 341 0.0
Organised to Deliver / Transformation 5,317 364 0.0 365 0 0.0 311 10 0.0
Operational Management
Totals 15,707 5,397 0.0 4,535 133 0.0 2,589 351 0.0
2025/26 2026/27 2027/28
4
Page 47 of 162

Page 48

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2025/26 TO 2027/28
EXPENDITURE PRESSURES - Tackling Poverty 25/26 26/27 27/28
£'000 £'000 £'000
1 Operations - Living Wage 54 22 56
Environment &
Infrastructure
Inflationary Pressures - Provision for impact of Real Living Wage on agency contracts.  Rates assumed are
4.48%, 2.74% and 2.74%.                                                                                                                                                                                                                                                                                                                  
TOTAL 54 22 56
Pressure
Page 48 of 162

Page 49

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2025/26 TO 2027/28
EXPENDITURE PRESSURES - Tackling climate change and supporting sustainable places 25/26 26/27 27/28
£'000 £'000 £'000
1 Investment in Waste Management 1,839 (475) (356)
Environment &
Infrastructure
Following the confirmation of the income from the  Extended Producer Responsibility for Packaging
agreement, it is proposed that funds are allocated to take forward investment in various waste management
projects and improvements in keeping with the intended purpose of the funding.
TOTAL 1,839 (475) (356)
Pressure
Page 49 of 162

Page 50

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2025/26 TO 2027/28
EXPENDITURE PRESSURES - Developing a resilient, stronger and greener local economy 25/26 26/27 27/28
£'000 £'000 £'000
1 Business & Place Development: Perth & Kinross Heritage Trust 55
Economy,
Development
&
Planning
In February 2024 the Council agreed to a recurring saving of £70,000 by re-contracting the statutory
provision for archaeological advice and maintaining the Historic Environment Record, reducing the SLA to
£30,000 per year. These services were provided by Perth and Kinross Heritage Trust.
However, after further review, the actual annual cost is now determined to be £85,000 which results in an
expenditure pressure of £55,000 to maintain these services. Subject to approval, it is the intention to
commission Perth and Kinross Heritage Trust to continue to provide these services.
TOTAL 55 0 0
Pressure
Page 50 of 162

Page 51

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2025/26 TO 2027/28
EXPENDITURE PRESSURES - Enabling our children and young people to achieve their full potential 25/26 26/27 27/28
£'000 £'000 £'000
1 Investment in Learning (IIL) and Bertha Park High School Unitary Charge 43 77 527
Property IIL and Bertha Park High School Unitary Charge inflation - Retail Price Index (RPI) - Estimate for January
2025  3.45%, Uplift to  2.3% in 26/27 and 2.1% in 27/28 in line with medium term financial plan (previously
agreed 25/26 3%, 26/27 2%).
2 Rationalisation of Education staff across the service (485) 2,665
Education &
Learning
Following the Scottish Government's agreement with COSLA regarding Teacher Numbers, a review is
required of the previously agreed reduction of £4,359,000.
3 33 Week Period in Secondary Schools 435
Education &
Learning
Reversal of reduction agreed in February 2024. The Scottish Government plans to reduce teacher class
contact time by an additional 90 minutes. This alongside the commitment to maintain teacher numbers
means this reduction is no longer possible. 
4 Teachers Slippage Target 552
Education &
Learning
Pressure to reduce current slippage target of 4% to 3.5%.
5 Home to School Transport 420 255 240
Education &
Learning
Pressure due to increased costs for ASN Home to School transport and Inflationary uplift in 2026/27 &
2027/28 of 5% offset by possible reduction in ASN transport following ASN Transformation Project. 
6 Independent School placements 330 42 40
Education &
Learning
Pressure due to increase in number of pupils with high level additional Support needs in Independent
Schools . Inflationary uplift in 2026/27 2.3% 2027/28 of 2.1%
7 Devolved School Management Cleaning Budgets 150
Education &
Learning
Pressure to increase budget allocated to schools for cleaning materials to match spend.
Pressure
Page 51 of 162

Page 52

8 Property Costs - Facilities Management,  Cleaning & Catering 296 88 508
Property Pressure due to shortfall in and inflationary uplift of 3% across consolidated budgets in 25/26, 26/27 and
27/28 inline with medium term financial plan pay award assumptions.
9 Young People with emotional and behavioural difficulties in Residential Care 90
Children 
Families &
Justice
Inflationary pressure of 3% for residential placements in line with projected pay award . Previously agreed
inflationary pressure of 25/26 3%,  26/27 2.5%.
TOTAL 1,306 3,562 1,405
Page 52 of 162

Page 53

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2025/26 TO 2027/28
EXPENDITURE PRESSURES - Protecting and caring for our most vulnerable people 25/26 26/27 27/28
£'000 £'000 £'000
1 Supported Accommodation Costs 150 50 50
Customer &
Digital
This was previously met from the Housing Benefit budget which is a net budget of £54k as it is assumed that
most of the Housing Benefit paid out will be recouped via subsidy. The Supported Accommodation costs
have increased by providers over a number of years and elements of these cost aren't able to be met from
Housing Benefit.
2 Net Contribution to Perth and Kinross Health and Social Care Partnership 6,700
Health & Social
Care
3 Children, Family and Justice Service Redesign (50) 464
Children 
Families &
Justice
A review of the reduction agreed in February 2024 of £464,000. £50,000 reduction delivered in 25/26.
TOTAL 6,800 514 50
Pressure
Page 53 of 162

Page 54

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2025/26 TO 2027/28
EXPENDITURE PRESSURES - Supporting and promoting physical and mental wellbeing 25/26 26/27 27/28
£'000 £'000 £'000
No pressure
TOTAL 0 0 0
Pressure
Page 54 of 162

Page 55

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2025/26 TO 2027/28
EXPENDITURE PRESSURES - Working in partnership with communities 25/26 26/27 27/28
£'000 £'000 £'000
1 Community Greenspace - Contract Inflation 25
Housing
&
Communities
Provision for contract inflation on community greenspace planned and reactive maintenance contracts. 
Inflation rates assumed are 2.6%, 2.3% and 2.1% in line with Medium Term Financial Plan.
2 Roads, Structures, Traffic & Network, Street Lighting - Contract Inflation 20 65
Environment &
Infrastructure
Provision for contract inflation across planned and reactive maintenance contracts. Inflation rates assumed
are 2.6%, 2.3% and 2.1% in line with Medium Term Financial Plan. This pressure also includes provision in
2025/26 for contract maintenance on Traffic Signals to reflect the increase in new sites.
3 Winter Maintenance - Contract Inflation 95
Environment &
Infrastructure
Provision for contract inflation.  Inflation rates assumed are 2.6%, 2.3% and 2.1% in line with the Medium
Term Financial Plan.
4 Operations Fuel 35
Environment &
Infrastructure
Provision for contract price increase for fuel across all activities.  Inflation rates assumed are 2.6%, 2.3% and
2.1% in line with Medium Term Financial Plan.
5 Street Lighting, Illuminated Signs and Traffic Signals - Net Energy Pressure (100) 0 50
Environment &
Infrastructure
Provision for energy price inflation at  -21.4%, -3.6%, 2% . This is net of increased loan charges arising from
the LED and column replacement programme.
6 Waste Disposal - Contract Inflation 140
Environment &
Infrastructure
Provision for contract inflation.  Inflation rates assumed are 2.6%, 2.3% and 2.1% in line with Medium Term
Financial Plan.
Pressure
Page 55 of 162

Page 56

7 Public Transport Tendered Services - Contract Inflation 185
Housing
&
Communities
Provision for contract inflation on subsidised local bus service contracts. Inflation rates assumed are 5%, 5% 
and 5%.
8 Parking Services 58 68 160
Housing
&
Communities
Provision for increased staff costs and inflation on operating costs including maintenance of car parks and
ticket machines, park and ride services, multi storey car park and investment in car parking infrastructure.
Costs to be covered by an increase in parking charges. Inflation rates assumed are 2.6%, 2.3% and 2.1% in
line with Medium Term Financial Plan.
10 Roads Maintenance Partnership - Flood Energy and Maintenance Contracts 22 4 12
Environment &
Infrastructure
Provision for the increase in energy and maintenance costs relating to pumping stations and flood gates,
including the current base budget pressure and the additional provision for flood scheme maintenance at
Comrie in 2027/28. Inflation rates assumed are 2.6%, 2.3% and 2.1% in line with the Medium Term Financial
plan. This budget does not cover the costs of severe weather response which is held separately.
11 Council Wide  - Fleet Loan Charges 336 475 356
Environment &
Infrastructure
Increase in loan charges budget to meet the borrowing costs of the Council wide fleet replacement
programme. Vehicle purchase costs have risen considerably in recent years, most notably with the heavy
fleet, which are now impacting on loan charge costs.
TOTAL 336 547 1,123
Page 56 of 162

Page 57

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2025/26 TO 2027/28
EXPENDITURE PRESSURES - Organised to Deliver / Transformation 25/26 26/27 27/28
£'000 £'000 £'000
1 Property Maintenance 100
Property Inflationary increases on contracts and portfolio condition demands. This is an inflationary increase of 20% in
23/24 (24/25 5%; 25/26 5% & 26/27 4.5% ).
2 Non Domestic Rates 170
Property Provision for increases to rates. Inflationary increases assumed as 2.6%, 2.3% and 2.1%.
3 Insurance Premiums & Claims cost increase 1,000
Finance &
Business
Support
The insurance market has seen significant movement over the last few years. The impact for Insurance and
Claims handling is that in financial year 2020/2021 the cost of these services was just under £1m. It is
projected to increase to over £2m in 2024/2025.This is the net pressure after recharges to the Housing
Revenue Account.
Pressure
Page 57 of 162

Page 58

4 NDR Estate changes 130
Property There were several notable changes in Non-Domestic Rating for Financial Year 2024/25 that increased the
amount of Rates payable by the Council. The Council introduced a policy on empty premises that replaced
unlimited exemptions for certain categories, such as listed buildings, with full relief from Rates for six months
only.
Such premises that had previously been empty for six months as of 1st April 2024 saw their exemption being
removed and full rates being charged.
The cap on the amount of Rates payable by premises that lost entitlement to Rural Rates Relief, such as
some rural schools, due to the 2023 revaluation exercise was increased from £600 to £1200.
The award of Transitional Relief for all subjects that saw a significant increase in their rateable value as part
of the revaluation exercise was reduced in 2024/25 compared with 2023/24.
Entries were made to the Valuation Roll for commercial activity in public parks for the first time on 1st April
2023. Such premises saw a decrease in Rates Relief from 67% in 2023/24 to 33% in 2024/25.
5 Transfer of Bell's from Live Active Leisure to Council 180
Property Additional costs associated with the transfer of Bell's back to the Council
Property Maintenance  - £50,000
Statutory Compliance and Servicing - £10,000
Energy Use - £50,000
Provision of Toilets for Public use - £10,000
Security of the Building - £40,000
Monthly inspections of existing RAAC - £20,000
6 AI Strategic Programme 500 250
Legal &
Governance The investment in our AI strategic programme is essential for driving innovation, efficiency, and digital
transformation within the Council. This funding will support the development and implementation of AI tools
that streamline operations and enhance service delivery. By investing in cutting-edge technology, we are
ensuring that our AI tools are safe and appropriate while also providing opportunities for our staff to upskill
and reskill.
Page 58 of 162

Page 59

7 Procurement Capacity 75
Legal &
Governance
This would increase the current Procurement Team from 8.94 FTE to 10.44 FTE. The increased capacity
would allow for a more commercial approach to the delivery of contracts and providing better management
information on the council's spend which will inform strategic decision making.
8 MIS Saving 300
Customer &
Digital
This saving was introduced as part of the budget in March 2023.  The council’s increasing reliance on
systems to drive forward efficiencies and transformation require MIS staffing teams and a significant
reduction in capacity would seriously limit the organisations ability to fully embrace the rapidly changing IT
environment that will support front line staff in the efficient undertaking of their jobs in the future
9 HR & Payroll System Licence 62 15 16
Customer &
Digital
The contract for the above system ceases from May 25. There are additional costs associated with extending
the contract.
10 PK Performs Additional Licences 15
Customer &
Digital
The contract for the above system ceases from March 25. There is an option to extend for a further year and
to maximise the benefit of the system additional user licences are required..
11 Service Wide IT System Licensing & Support 28 25 25
Customer &
Digital
Provision for inflation on system licence costs. Inflation rates assumed are 2.6%, 2.3% and 2.1%
12 Blairgowrie Recreational Facility 122
Property Additional costs (mainly staffing and property) associated with operating the larger, enhanced facility.
13 Implementation of Recommendations of SLARC from 1 April 2025 180
Corporate The estimated costs of implementing the recommendations of the SLARC which represents an average
increase of 15% per annum.
Page 59 of 162

Page 60

14 Employer's National Insurance 2,800
Property Currently the revenue budget has been constructed on the basis that any additional costs arising from the
changes to employer's national insurance costs will be fully funded (estimated approximately £5.4 million). 
There is a risk that this is not fully funded. 
Furthermore the figure identified above does not take into account ALEOs, Tayside Contracts, and other
organisations that provide services on behalf of the Council.
TOTAL 5,317 365 311
Page 60 of 162

Page 61

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2025/26 TO 2027/28
BUDGET REDUCTIONS - Tackling poverty 25/26 26/27 27/28 25/26 26/27 27/28
£'000 £'000 £'000 FTE FTE FTE
No reduction
TOTAL 0 0 0 0.0 0.0 0.0
Saving/Income Saving/Income
Page 61 of 162

Page 62

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2025/26 TO 2027/28
BUDGET REDUCTIONS - Tackling climate change and supporting sustainable places 25/26 26/27 27/28 25/26 26/27 27/28
£'000 £'000 £'000 FTE FTE FTE
1 Income - Extended Producer Responsibility for Packaging 4,975
Environment &
Infrastructure
Perth & Kinross Council's share of additional income being paid to Local
Authorities from the UK Government for payments made by some
organisations and businesses for the packaging they supply to or import into
the UK market. This is called extended producer responsibility (EPR) for
packaging and is intended to cover the net costs of collecting, managing,
recycling and disposing of household packaging waste.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified.
Workforce: No significant impact identified.
Customer: No significant impact identified.
Equalities/Diversity: No significant impact identified.
Outcome and Performance: No significant impact identified.
Climate Change: No significant impact identified.
TOTAL 4,975 0 0 0.0 0.0 0.0
Saving/Income Saving/Income
Page 62 of 162

Page 63

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2025/26 TO 2027/28
BUDGET REDUCTIONS - Developing a resilient, stronger and greener local economy 25/26 26/27 27/28 25/26 26/27 27/28
£'000 £'000 £'000 FTE FTE FTE
No reduction
TOTAL 0 0 0 0.0 0.0 0.0
Saving/Income Saving/Income
Page 63 of 162

Page 64

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2025/26 TO 2027/28
BUDGET REDUCTIONS - Enabling our children and young people to achieve 25/26 26/27 27/28 25/26 26/27 27/28
their full potential £'000 £'000 £'000 FTE FTE FTE
No reduction
TOTAL 0 0 0 0.0 0.0 0.0
Saving/Income Saving/Income
Page 64 of 162

Page 65

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2025/26 TO 2027/28
BUDGET REDUCTIONS - Protecting and caring for our most vulnerable people 25/26 26/27 27/28 25/26 26/27 27/28
£'000 £'000 £'000 FTE FTE FTE
No reduction
TOTAL 0 0 0 0.0 0.0 0.0
Saving/Income Saving/Income
Page 65 of 162

Page 66

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2025/26 TO 2027/28
BUDGET REDUCTIONS - Supporting and promoting physical and mental wellbeing 25/26 26/27 27/28 25/26 26/27 27/28
£'000 £'000 £'000 FTE FTE FTE
No reduction
TOTAL 0 0 0 0.0 0.0 0.0
Saving/Income Saving/Income
Page 66 of 162

Page 67

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2025/26 TO 2027/28
BUDGET REDUCTIONS - Working in partnership with communities 25/26 26/27 27/28 25/26 26/27 27/28
£'000 £'000 £'000 FTE FTE FTE
1 Refuse Collection - Garden Waste Permit Charge 65 68
Environment &
Infrastructure
Increase Garden Waste Permit charges by 4% in 2026/27 and 2027/28 in line
with the Medium Term Financial Plan.
Already approved in 2025/26 - Increased charge from £40 to £45 per bin.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified.
Workforce: No significant impact identified.
Customer: No significant impact identified.
Equalities/Diversity: No significant impact identified.
Outcome and Performance: There is a risk that there may be a drop-off in the
customer base as a result of this further increase.
Climate Change: No significant impact identified.
Saving/Income Saving/Income
Page 67 of 162

Page 68

2 Non Statutory / Discretionary Charges - H&C 87
Housing
&
Communities
Increase non-statutory/discretionary charges across Housing & Communities
by 4% per annum in line with the Medium Term Financial Plan.
Bereavement Services – 4% per annum..
Regulatory Services – 4% per annum
Pitches & Park Events – 4% per annum (except for Pitches in 2025/26 only,
where increase proposed is 11% as there has been no increase for several
years)
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact identified but will impact more on those
with fewer resources.
Workforce: No significant impact identified.
Customer: No significant impact identified.
Equalities/Diversity: The increase in bereavement charges may result in an
increase in the number of public health funerals.
Outcome and Performance: There is currently no benchmarking information
available nationally for bereavement charges.
Climate Change: No significant impact identified.
Page 68 of 162

Page 69

3 Road Network Commercial Charges 26
Environment &
Infrastructure
Increase Road Network Commercial Charges by 4% per annum in line with the
Medium Term Financial Plan.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant impact.
Workforce: No significant impact identified.
Customer: No significant impact identified.
Equalities/Diversity: No significant impact identified.
Outcome and Performance: This will impact mainly on commercial
customers.
Climate Change: No significant impact identified.
Page 69 of 162

Page 70

4 Parking Services 58 68 160
Housing
&
Communities
Increase parking charges by 4% to offset the impact of inflation on operating
costs and investment in car parking infrastructure. Proposed increase excludes
Penalty Charge Notices, Vehicle Uplift Charges and Blue Badges which are set
by statute. Actual % change will vary due to minimum 10p coinage requirement
in ticket machines and actual income generated will be subject to public
response to increases.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: May present an additional cost burden to customers with
limited access to other means of suitable transport for employment, healthcare
and essential shopping etc combined with the current cost of living crisis.
Workforce: No significant impact identified.
Customer: Potential resistance from customers and business community.
Equalities/Diversity: No significant impact identified.
Outcome and Performance: Potential that customer base will drop off
resulting in no real increase in income generated.
Climate Change: Increased parking charges might encourage car owners to
use more environmentally friendly modes of transport including the option of
active travel with associated health benefits and positive impact on air quality.
TOTAL 58 133 341 0.0 0.0 0.0
Page 70 of 162

Page 71

PERTH & KINROSS COUNCIL
REVENUE BUDGET 2025/26 TO 2027/28
BUDGET REDUCTIONS - Organised to Deliver / Transformation 25/26 26/27 27/28 25/26 26/27 27/28
£'000 £'000 £'000 FTE FTE FTE
1 Income Generation 10
Customer &
Digital 2027/28
Additional income from Scottish Water with revised charges relating to Water
Charges Billing and
Collection Order
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant
impact identified.
Workforce: No significant impact identified.
Customer: No significant impact identified.
Equalities/Diversity: No significant impact identified.
Outcome and Performance: No significant impact identified.
Climate Change: No significant impact identified.
Saving/Income Saving/Income
Page 71 of 162

Page 72

2 Corporate Slippage Target 364
Council Wide
2025/26
Additional budgeted slippage that is generated after the uprating staff costs to
reflect recent pay awards
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address Socio Economic
Disadvantage: No significant
impact identified.
Workforce: No significant impact identified.
Customer: No significant impact identified.
Equalities/Diversity: No significant impact identified.
Outcome and Performance: No significant impact identified.
Climate Change: No significant impact identified.
TOTAL 364 0 10 0.0 0.0 0.0
Page 72 of 162

Page 73

2025/26
REVENUE BUDGET
Fees and Charges
1. Commercial and Domestic Waste 17. Electrical Vehicle Charging
2. North Inch Golf Course 18. Public Transport
3. Football Pitches and Parks Events 19. Housing Management Services
4. Miscellaneous 20. School Meals and Breakfast Clubs
5. Bereavement Services – Burial 21. Childcare Strategy Services
6. Bereavement Services – Cremation 22. School / Community Campus / Astro
Pitches Lets
7. Fleet 23. Instrumental Music Tuition – Central
Groups
8. Smoking 24. Consultancy and Staff Development
9. Litter 25. Wellbank House Rent
10. Road Network Commercial Permit 26. Care and Support Services
11. Trading Standards 27. Design Works
12. Environmental Health 28. Perth and Kinross Licencing Board Fees
Under the Licencing (Scotland) Act 2005
13. Dog Fouling 29. Amended Fees Under Civic Government
(Scotland) Act 1982
14. Parking 30. Democratic Services
15. Planning and Building Standards 31. Human Resources
16. Street Naming and Numbering / Road
Construction Consents / Vehicular Access 32. Housing Related 
Appendix D 4
Page 73 of 162

Page 74

PERTH AND KINROSS COUNCIL
CHARGES EFFECTIVE 1ST APRIL 2025 (UNLESS OTHERWISE STATED) - VAT @ 20%
Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
1: COMMERCIAL AND DOMESTIC WASTE CHARGES
GENERAL WASTE COLLECTION AND DISPOSAL CHARGES
(PER CONTAINER/PER UPLIFT)
Bin Size
140 ltr £3.80 £0.00 £3.80 £4.10 £0.00 £4.10
240 ltr £5.25 £0.00 £5.25 £5.45 £0.00 £5.45
330 ltr £6.50 £0.00 £6.50 £6.75 £0.00 £6.75
360 ltr £6.95 £0.00 £6.95 £7.15 £0.00 £7.15
500 ltr £9.85 £0.00 £9.85 £10.10 £0.00 £10.10
660 ltr £12.15 £0.00 £12.15 £12.35 £0.00 £12.35
770 ltr £13.70 £0.00 £13.70 £13.85 £0.00 £13.85
1000 ltr £17.00 £0.00 £17.00 £17.00 £0.00 £17.00
1100 ltr £18.40 £0.00 £18.40 £18.40 £0.00 £18.40
1280 ltr £21.00 £0.00 £21.00 £21.00 £0.00 £21.00
RECYCLING SERVICES (PER CONTAINER/PER UPLIFT)
Glass:
180 ltr Mixed Glass (Only available to existing customers) £3.00 £0.00 £3.00 £3.00 £0.00 £3.00
240 ltr Mixed Glass £3.00 £0.00 £3.00 £3.00 £0.00 £3.00
Paper and Cardboard
120 ltr (Only available to existing customers) £2.30 £0.00 £2.30 £2.30 £0.00 £2.30
140 ltr £2.30 £0.00 £2.30 £2.30 £0.00 £2.30
240 ltr £2.45 £0.00 £2.45 £2.45 £0.00 £2.45
360 ltr £2.75 £0.00 £2.75 £3.60 £0.00 £3.60
500 ltr £4.00 £0.00 £4.00 £4.00 £0.00 £4.00
660 ltr £4.30 £0.00 £4.30 £4.30 £0.00 £4.30
770 ltr £4.50 £0.00 £4.50 £4.50 £0.00 £4.50
1100 ltr £5.20 £0.00 £5.20 £5.20 £0.00 £5.20
1280 ltr £5.70 £0.00 £5.70 £5.70 £0.00 £5.70
Mixed Plastics and Cans:
140 ltr £2.30 £0.00 £2.30 £2.65 £0.00 £2.65
240 ltr £2.45 £0.00 £2.45 £2.80 £0.00 £2.80
360 ltr £2.75 £0.00 £2.75 £3.15 £0.00 £3.15
660 ltr £4.45 £0.00 £4.45 £5.15 £0.00 £5.15
770 ltr £4.75 £0.00 £4.75 £5.50 £0.00 £5.50
1100 ltr £5.65 £0.00 £5.65 £6.45 £0.00 £6.45
Page 74 of 162

Page 75

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
Garden Waste:     
240 ltr £4.60 £0.00 £4.60 £4.70 £0.00 £4.70
360 ltr £5.90 £0.00 £5.90 £5.95 £0.00 £5.95
Food Waste:         
120 ltr (Only available to existing customers) £4.70 £0.00 £4.70 £4.70 £0.00 £4.70
140 ltr £4.90 £0.00 £4.90 £4.90 £0.00 £4.90
180 ltr (Only available to existing customers) £5.40 £0.00 £5.40 £5.40 £0.00 £5.40
Front End Loader:
General Waste £90.00 £0.00 £90.00 £90.00 £0.00 £90.00
Paper and Cardboard Recycling £30.00 £0.00 £30.00 £30.00 £0.00 £30.00
Mixed Plastic and Tins Recycling £30.00 £0.00 £30.00 £32.10 £0.00 £32.10
FEL Excess Weight Charge for General Waste (Per Kg) £0.15 £0.00 £0.15 £0.15 £0.00 £0.15
Bells:
Clear Glass £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Brown Glass £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Green Glass £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Mixed Glass £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Waste Transfer Note - Annual Charge £30.00 £0.00 £30.00 £30.00 £0.00 £30.00
(For all commercial uplift customers; covers general waste and recycling waste)
MISCELLANEOUS
Trade Waste Sacks  ( x 50) £103.00 £0.00 £103.00 £108.00 £0.00 £108.00
Trade Waste Sack Delivery Charge £5.00 £0.00 £5.00 £5.00 £0.00 £5.00
Trade Waste Labels  ( x 50) £103.00 £0.00 £103.00 £108.00 £0.00 £108.00
Green Cardboard Labels ( x 50) £59.00 £0.00 £59.00 £59.00 £0.00 £59.00
MPT Sacks ( x 15) £16.00 £0.00 £16.00 £17.10 £0.00 £17.10
Wheeled Bin Liners ( x 5) £0.83 £0.17 £1.00 £0.83 £0.17 £1.00
Bulky Uplift (allows for up to 5 bulky items) £35.00 £0.00 £35.00 £35.00 £0.00 £35.00
Special Uplift Service - Quote on Request QUOTE ON REQUEST £0.00 QUOTE ON REQUEST QUOTE ON REQUEST £0.00 QUOTE ON REQUEST
Contaminated Bin Uplift £6.00 £0.00 £6.00 £6.00 £0.00 £6.00
Domestic Garden Waste - Annual Permit/Per Bin (Max. 2 x 240 ltr bins per household) £40.00 £0.00 £40.00 £45.00 £0.00 £45.00
Food Waste Recycling Sacks ( x 15) £1.50 £0.30 £1.80 £1.60 £0.32 £1.92
Compostable Caddy Liners ( x 26) £1.04 £0.21 £1.25 £1.04 £0.21 £1.25
240L Clear Liners ( x 100) £21.00 £4.20 £25.20 £21.00 £4.20 £25.20
Pink Refuse Sack ( x 50) - See Note 2 £3.42 £0.68 £4.10 £4.71 £0.94 £5.65
Development Charges - New Housing Developments:
Provision of Bins -  x3 Bins (including delivery) £90.00 £0.00 £90.00 £94.00 £0.00 £94.00
Provision of Bins -  x4 Bins (including delivery) £110.00 £0.00 £110.00 £114.00 £0.00 £114.00
Provision of Bins - Communal Bin (including delivery) £210.00 £0.00 £210.00 £218.00 £0.00 £218.00
Page 75 of 162

Page 76

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
Continental Container Purchase/Delivery/Handling:
140 ltr £21.25 £4.25 £25.50 £21.25 £4.25 £25.50
240 ltr £27.21 £5.44 £32.65 £27.21 £5.44 £32.65
360 ltr £41.04 £8.21 £49.25 £44.50 £8.90 £53.40
360 ltr (lockable) £73.00 £14.60 £87.60 £73.00 £14.60 £87.60
500 ltr £415.00 £83.00 £498.00 £435.00 £87.00 £522.00
660 ltr £396.50 £79.30 £475.80 £396.50 £79.30 £475.80
770 ltr £385.00 £77.00 £462.00 £385.00 £77.00 £462.00
1100 ltr £408.50 £81.70 £490.20 £408.50 £81.70 £490.20
1280 ltr £480.00 £96.00 £576.00 £501.00 £100.20 £601.20
Slam Locks £25.92 £5.18 £31.10 £25.92 £5.18 £31.10
COMMERCIAL BIN RENTAL CHARGES (PER WEEK)
General Waste Bin Rental
140 ltr £0.60 £0.00 £0.60 £0.60 £0.00 £0.60
240 ltr £0.60 £0.00 £0.60 £0.60 £0.00 £0.60
360 ltr £1.00 £0.00 £1.00 £1.00 £0.00 £1.00
500 ltr £2.50 £0.00 £2.50 £2.50 £0.00 £2.50
660 ltr £2.50 £0.00 £2.50 £2.50 £0.00 £2.50
770 ltr £2.50 £0.00 £2.50 £2.50 £0.00 £2.50
1100 ltr £3.00 £0.00 £3.00 £3.00 £0.00 £3.00
1280 ltr £3.50 £0.00 £3.50 £3.50 £0.00 £3.50
Mixed Plastic and Tins Bin Rental
140 ltr £0.60 £0.00 £0.60 £0.60 £0.00 £0.60
240 ltr £0.60 £0.00 £0.60 £0.60 £0.00 £0.60
360 ltr £0.90 £0.00 £0.90 £0.90 £0.00 £0.90
660 ltr £1.25 £0.00 £1.25 £1.25 £0.00 £1.25
770 ltr £1.30 £0.00 £1.30 £1.30 £0.00 £1.30
1100 ltr £1.35 £0.00 £1.35 £1.35 £0.00 £1.35
Garden Waste Bin Rental
140 ltr £0.60 £0.00 £0.60 £0.60 £0.00 £0.60
240 ltr £0.60 £0.00 £0.60 £0.60 £0.00 £0.60
360 ltr £0.90 £0.00 £0.90 £0.90 £0.00 £0.90
Paper and Cardboard Bin Rental
140 ltr £0.60 £0.00 £0.60 £0.60 £0.00 £0.60
240 ltr £0.60 £0.00 £0.60 £0.60 £0.00 £0.60
360 ltr £0.90 £0.00 £0.90 £0.90 £0.00 £0.90
500 ltr £1.25 £0.00 £1.25 £1.25 £0.00 £1.25
660 ltr £1.25 £0.00 £1.25 £1.25 £0.00 £1.25
770 ltr £1.30 £0.00 £1.30 £1.30 £0.00 £1.30
1100 ltr £1.35 £0.00 £1.35 £1.35 £0.00 £1.35
1280 ltr £1.40 £0.00 £1.40 £1.40 £0.00 £1.40
Page 76 of 162

Page 77

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
Food Waste Bin Rental
140 ltr £0.60 £0.00 £0.60 £0.60 £0.00 £0.60
180 ltr £0.60 £0.00 £0.60 £0.60 £0.00 £0.60
Glass Waste Bin Rental
180 ltr £0.60 £0.00 £0.60 £0.60 £0.00 £0.60
240 ltr £0.60 £0.00 £0.60 £0.60 £0.00 £0.60
* Note 1: Prices for customers outwith Perth and Kinross local authority area may vary from above and be subject to change
* Note 2: Pink Sacks - First 100 sacks per year are issued free of charge; additional sacks can be purchased as listed above
* Note 3: Bin Rental Charges - General Waste Bin Rental to be implemented in 2024/25 and all other bin rental charges implemented in 2025/26
PUBLIC CONVENIENCES
Charge per visit £0.50 £0.00 £0.50 £0.50 £0.00 £0.50
WASTE DISCHARGE FACILITIES
Motorhome/Campervan - Charge per empty £10.00 £2.00 £12.00 £10.00 £2.00 £12.00
Timber
Zone
1  -  Up to 5 miles from Friarton £38.00 + £11.00/tonne Applied as appropriate £38.00 + £11.00/tonne £38.00 + £11.00/tonne Applied as appropriate £38.00 + £11.00/tonne
2  -  Between 5 and 20 miles from Friarton £95.00 + £11.00/tonne Applied as appropriate £95.00 + £11.00/tonne £95.00 + £11.00/tonne Applied as appropriate £95.00 + £11.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £11.00/tonne Applied as appropriate £210.00 + £11.00/tonne £210.00 + £11.00/tonne Applied as appropriate £210.00 + £11.00/tonne
Inert
Zone
1  -  Up to 5 miles from Friarton £38.00 + £24.00/tonne Applied as appropriate £38.00 + £24.00/tonne £38.00 + £24.15/tonne Applied as appropriate £38.00 + £24.15/tonne
2  -  Between 5 and 20 miles from Friarton £95.00 + £24.00/tonne Applied as appropriate £95.00 + £24.00/tonne £95.00 + £24.15/tonne Applied as appropriate £95.00 + £24.15/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £24.00/tonne Applied as appropriate £210.00 + £24.00/tonne £210.00 + £24.15/tonne Applied as appropriate £210.00 + £24.15/tonne
Metals
Zone
1  -  Up to 5 miles from Friarton £38.00 + £0.00/tonne Applied as appropriate £38.00 + £0.00/tonne £38.00 + £0.00/tonne Applied as appropriate £38.00 + £0.00/tonne
2  -  Between 5 and 20 miles from Friarton £95.00 + £0.00/tonne Applied as appropriate £95.00 + £0.00/tonne £95.00 + £0.00/tonne Applied as appropriate £95.00 + £0.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £0.00/tonne Applied as appropriate £210.00 + £0.00/tonne £210.00 + £0.00/tonne Applied as appropriate £210.00 + £0.00/tonne
COMMERCIAL AND DOMESTIC SKIP HIRE CHARGES FOR
RECYCLABLE AND COMPOSTABLE WASTE IN (8, 10, 12 and 16 CUBE)
COMMERCIAL AND DOMESTIC SKIP HIRE CHARGES FOR
RECYCLABLE AND COMPOSTABLE WASTE IN (8, 10, 12 and 16 CUBE)
COMMERCIAL AND DOMESTIC SKIP HIRE CHARGES FOR
RECYCLABLE AND COMPOSTABLE WASTE IN (8, 10, 12 and 16 CUBE)
Page 77 of 162

Page 78

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
Garden
Zone
1  -  Up to 5 miles from Friarton £38.00 + £39.50/tonne Applied as appropriate £38.00 + £39.50/tonne £38.00 + £39.50/tonne Applied as appropriate £38.00 + £39.50/tonne
2  -  Between 5 and 20 miles from Friarton £95.00 + £39.50/tonne Applied as appropriate £95.00 + £39.50/tonne £95.00 + £39.50/tonne Applied as appropriate £95.00 + £39.50/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £39.50/tonne Applied as appropriate £210.00 + £39.50/tonne £210.00 + £39.50/tonne Applied as appropriate £210.00 + £39.50/tonne
Timber
Zone
1  -  Up to 5 miles from Friarton £48.00 + £11.00/tonne Applied as appropriate £48.00 + £11.00/tonne £48.00 + £11.00/tonne Applied as appropriate £48.00 + £11.00/tonne
2  -  Between 5 and 20 miles from Friarton £135.00 + £11.00/tonne Applied as appropriate £135.00 + £11.00/tonne £135.00 + £11.00/tonne Applied as appropriate £135.00 + £11.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £285.00 + £11.00/tonne Applied as appropriate £285.00 + £11.00/tonne £285.00 + £11.00/tonne Applied as appropriate £285.00 + £11.00/tonne
Inert
Zone
1  -  Up to 5 miles from Friarton £48.00 + £24.00/tonne Applied as appropriate £48.00 + £24.00/tonne £48.00 + £24.15/tonne Applied as appropriate £48.00 + £24.15/tonne
2  -  Between 5 and 20 miles from Friarton £135.00 + £24.00/tonne Applied as appropriate £135.00 + £24.00/tonne £135.00 + £24.15/tonne Applied as appropriate £135.00 + £24.15/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £285.00 + £24.00/tonne Applied as appropriate £285.00 + £24.00/tonne £285.00 + £24.15/tonne Applied as appropriate £285.00 + £24.15/tonne
Metals
Zone
1  -  Up to 5 miles from Friarton £48.00 + £0/tonne Applied as appropriate £48.00 + £0/tonne £48.00 + £0/tonne Applied as appropriate £48.00 + £0/tonne
2  -  Between 5 and 20 miles from Friarton £135.00 + £0/tonne Applied as appropriate £135.00 + £0/tonne £135.00 + £0/tonne Applied as appropriate £135.00 + £0/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £285.00 + £0/tonne Applied as appropriate £285.00 + £0/tonne £285.00 + £0/tonne Applied as appropriate £285.00 + £0/tonne
Garden
Zone
1  -  Up to 5 miles from Friarton £48.00 + £39.50/tonne Applied as appropriate £48.00 + £39.50/tonne £48.00 + £39.50/tonne Applied as appropriate £48.00 + £39.50/tonne
2  -  Between 5 and 20 miles from Friarton £135.00 + £39.50/tonne Applied as appropriate £135.00 + £39.50/tonne £135.00 + £39.50/tonne Applied as appropriate £135.00 + £39.50/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £285.00 + £39.50/tonne Applied as appropriate £285.00 + £39.50/tonne £285.00 + £39.50/tonne Applied as appropriate £285.00 + £39.50/tonne
COMMERCIAL AND DOMESTIC SKIP HIRE CHARGES FOR
RECYCLABLE AND COMPOSTABLE WASTE IN (8, 10, 12 and 16 CUBE)
COMMERCIAL AND DOMESTIC SKIP HIRE CHARGE FOR
RECYCLABLE AND COMPOSTABLE WASTE IN (35 and 40 CUBE)
COMMERCIAL AND DOMESTIC SKIP HIRE CHARGE FOR
RECYCLABLE AND COMPOSTABLE WASTE IN (35 and 40 CUBE)
COMMERCIAL AND DOMESTIC SKIP HIRE CHARGE FOR
RECYCLABLE AND COMPOSTABLE WASTE IN (35 and 40 CUBE)
COMMERCIAL AND DOMESTIC SKIP HIRE CHARGE FOR
RECYCLABLE AND COMPOSTABLE WASTE IN (35 and 40 CUBE)
Page 78 of 162

Page 79

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
COMMERCIAL AND DOMESTIC SKIP EXCESS HIRE CHARGE
Small Skips (8 / 10 / 12 / 16 Cube) - All Locations
Large Skips (35 / 40 Cube) - All Locations
Account Customers (Commercial Waste Uplifts) - All Locations
* Note: Commercial skip hire charges will be Outwith Scope for VAT
* Note: Domestic/Household skip hire charges will be liable for
Standard Rate VAT charge
HOUSEHOLD SKIP HIRE - BLACK BAG GENERAL WASTE (8 and 10 CUBE - MAX CAPACITY 2.5 TONNES)
Zone
1  -  Less than 5 miles from Friarton £38.00 + £136.50/tonne Applied to total charge £38.00 + £136.50/tonne £38.00 + £136.50/tonne Applied to total charge £38.00 + £136.50/tonne
2  -  Between 5 and 20 miles from Friarton £95.00 + £136.50/tonne Applied to total charge £95.00 + £136.50/tonne £95.00 + £136.50/tonne Applied to total charge £95.00 + £136.50/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £136.50/tonne Applied to total charge £210.00 + £136.50/tonne £210.00 + £136.50/tonne Applied to total charge £210.00 + £136.50/tonne
HOUSEHOLD SKIP HIRE - WUDS BULKY GENERAL WASTE (8 and 10 CUBE - MAX CAPACITY 2.5 TONNES)
Zone
1  -  Less than 5 miles from Friarton £38.00 + £270.20/tonne Applied to total charge £38.00 + £270.20/tonne £38.00 + £270.20/tonne Applied to total charge £38.00 + £270.20/tonne
2  -  Between 5 and 20 miles from Friarton £95.00 + £270.20/tonne Applied to total charge £95.00 + £270.20/tonne £95.00 + £270.20/tonne Applied to total charge £95.00 + £270.20/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £270.20/tonne Applied to total charge £210.00 + £270.20/tonne £210.00 + £270.20/tonne Applied to total charge £210.00 + £270.20/tonne
HOUSEHOLD SKIP HIRE - BULKY GENERAL WASTE (8 and 10 CUBE - MAX CAPACITY 2.5 TONNES)
Zone
1  -  Less than 5 miles from Friarton £38.00 + £166.00/tonne Applied to total charge £38.00 + £166.00/tonne £38.00 + £171.00/tonne Applied to total charge £38.00 + £171.00/tonne
2  -  Between 5 and 20 miles from Friarton £95.00 + £166.00/tonne Applied to total charge £95.00 + £166.00/tonne £95.00 + £171.00/tonne Applied to total charge £95.00 + £171.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £166.00/tonne Applied to total charge £210.00 + £166.00/tonne £210.00 + £171.00/tonne Applied to total charge £210.00 + £171.00/tonne
HOUSEHOLD SKIP HIRE - BLACK BAG GENERAL WASTE (12 CUBE - MAX CAPACITY 4 TONNES)
Zone
1  -  Less than 5 miles from Friarton £38.00 + £136.50/tonne Applied to total charge £38.00 + £136.50/tonne £38.00 + £136.50/tonne Applied to total charge £38.00 + £136.50/tonne
2  -  Between 5 and 20 miles from Friarton £95.00 + £136.50/tonne Applied to total charge £95.00 + £136.50/tonne £95.00 + £136.50/tonne Applied to total charge £95.00 + £136.50/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £136.50/tonne Applied to total charge £210.00 + £136.50/tonne £210.00 + £136.50/tonne Applied to total charge £210.00 + £136.50/tonne
HOUSEHOLD SKIP HIRE - WUDS BULKY GENERAL WASTE (12 CUBE - MAX CAPACITY 4 TONNES)
Zone
1  -  Less than 5 miles from Friarton £38.00 + £270.20/tonne Applied to total charge £38.00 + £270.20/tonne £38.00 + £270.20/tonne Applied to total charge £38.00 + £270.20/tonne
2  -  Between 5 and 20 miles from Friarton £95.00 + £270.20/tonne Applied to total charge £95.00 + £270.20/tonne £95.00 + £270.20/tonne Applied to total charge £95.00 + £270.20/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £270.20/tonne Applied to total charge £210.00 + £270.20/tonne £210.00 + £270.20/tonne Applied to total charge £210.00 + £270.20/tonne
Full 7 day hire charge (listed above) will be
applied for each additional 7 days or part thereof
Full 7 day hire charge (listed above) will be
applied for each additional 7 days or part thereof
28 Days of skip on site will be allowed within 7 day hire charge (listed above) 28 Days of skip on site will be allowed within 7 day hire charge (listed above)
Page 79 of 162

Page 80

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
HOUSEHOLD SKIP HIRE - BULKY GENERAL WASTE (12 CUBE - MAX CAPACITY 4 TONNES)
Zone
1  -  Less than 5 miles from Friarton £38.00 + £166.00/tonne Applied to total charge £38.00 + £166.00/tonne £38.00 + £171.00/tonne Applied to total charge £38.00 + £171.00/tonne
2  -  Between 5 and 20 miles from Friarton £95.00 + £166.00/tonne Applied to total charge £95.00 + £166.00/tonne £95.00 + £171.00/tonne Applied to total charge £95.00 + £171.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £166.00/tonne Applied to total charge £210.00 + £166.00/tonne £210.00 + £171.00/tonne Applied to total charge £210.00 + £171.00/tonne
HOUSEHOLD SKIP HIRE - BLACK BAG GENERAL WASTE (16 CUBE - MAX CAPACITY 5 TONNES)
Zone
1  -  Less than 5 miles from Friarton £38.00 + £136.50/tonne Applied to total charge £38.00 + £136.50/tonne £38.00 + £136.50/tonne Applied to total charge £38.00 + £136.50/tonne
2  -  Between 5 and 20 miles from Friarton £95.00 + £136.50/tonne Applied to total charge £95.00 + £136.50/tonne £95.00 + £136.50/tonne Applied to total charge £95.00 + £136.50/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £136.50/tonne Applied to total charge £210.00 + £136.50/tonne £210.00 + £136.50/tonne Applied to total charge £210.00 + £136.50/tonne
HOUSEHOLD SKIP HIRE - WUDS BULKY GENERAL WASTE (16 CUBE - MAX CAPACITY 5 TONNES)
Zone
1  -  Less than 5 miles from Friarton £38.00 + £270.20/tonne Applied to total charge £38.00 + £270.20/tonne £38.00 + £270.20/tonne Applied to total charge £38.00 + £270.20/tonne
2  -  Between 5 and 20 miles from Friarton £95.00 + £270.20/tonne Applied to total charge £95.00 + £270.20/tonne £95.00 + £270.20/tonne Applied to total charge £95.00 + £270.20/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £270.20/tonne Applied to total charge £210.00 + £270.20/tonne £210.00 + £270.20/tonne Applied to total charge £210.00 + £270.20/tonne
HOUSEHOLD SKIP HIRE - BULKY GENERAL WASTE (16 CUBE - MAX CAPACITY 5 TONNES)
Zone
1  -  Less than 5 miles from Friarton £38.00 + £166.00/tonne Applied to total charge £38.00 + £166.00/tonne £38.00 + £171.00/tonne Applied to total charge £38.00 + £171.00/tonne
2  -  Between 5 and 20 miles from Friarton £95.00 + £166.00/tonne Applied to total charge £95.00 + £166.00/tonne £95.00 + £171.00/tonne Applied to total charge £95.00 + £171.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £166.00/tonne Applied to total charge £210.00 + £166.00/tonne £210.00 + £171.00/tonne Applied to total charge £210.00 + £171.00/tonne
COMMERCIAL SKIP HIRE - BLACK BAG GENERAL WASTE (UP TO 16 CUBE)
Zone
1  -  Up to 5 miles from Friarton £38.00 + £136.50/tonne £0.00 £38.00 + £136.50/tonne £38.00 + £136.50/tonne £0.00 £38.00 + £136.50/tonne
2  -  Between 5 and 20 miles from Friarton £95.00 + £136.50/tonne £0.00 £95.00 + £136.50/tonne £95.00 + £136.50/tonne £0.00 £95.00 + £136.50/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £136.50/tonne £0.00 £210.00 + £136.50/tonne £210.00 + £136.50/tonne £0.00 £210.00 + £136.50/tonne
COMMERCIAL SKIP HIRE - BULKY GENERAL WASTE (UP TO 16 CUBE)
Zone
1  -  Up to 5 miles from Friarton £38.00 + £166.00/tonne £0.00 £38.00 + £166.00/tonne £38.00 + £171.00/tonne £0.00 £38.00 + £171.00/tonne
2  -  Between 5 and 20 miles from Friarton £95.00 + £166.00/tonne £0.00 £95.00 + £166.00/tonne £95.00 + £171.00/tonne £0.00 £95.00 + £171.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £166.00/tonne £0.00 £210.00 + £166.00/tonne £210.00 + £171.00/tonne £0.00 £210.00 + £171.00/tonne
Page 80 of 162

Page 81

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
COMMERCIAL SKIP HIRE - WUDS BULKY GENERAL WASTE (UP TO 16 CUBE)
Zone
1  -  Less than 5 miles from Friarton £38.00 + £270.20/tonne £0.00 £38.00 + £270.20/tonne £38.00 + £270.20/tonne £0.00 £38.00 + £270.20/tonne
2  -  Between 5 and 20 miles from Friarton £95.00 + £270.20/tonne £0.00 £95.00 + £270.20/tonne £95.00 + £270.20/tonne £0.00 £95.00 + £270.20/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £270.20/tonne £0.00 £210.00 + £270.20/tonne £210.00 + £270.20/tonne £0.00 £210.00 + £270.20/tonne
COMMERCIAL SKIP HIRE - MIXED PLASTICS AND TINS (UP TO 16 CUBE)
Zone
1  -  Up to 5 miles from Friarton £38.00 + £21.50/tonne £0.00 £38.00 + £21.50/tonne £38.00 + £45.00/tonne £0.00 £38.00 + £45.00/tonne
2  -  Between 5 and 20 miles from Friarton £95.00 + £21.50/tonne £0.00 £95.00 + £21.50/tonne £95.00 + £45.00/tonne £0.00 £95.00 + £45.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £21.50/tonne £0.00 £210.00 + £21.50/tonne £210.00 + £45.00/tonne £0.00 £210.00 + £45.00/tonne
COMMERCIAL SKIP HIRE - PAPER AND CARDBOARD (UP TO 16 CUBE)
Zone
1  -  Up to 5 miles from Friarton £38.00 + £28.00/tonne £0.00 £38.00 + £28.00/tonne £38.00 + £28.00/tonne £0.00 £38.00 + £28.00/tonne
2  -  Between 5 and 20 miles from Friarton £95.00 + £28.00/tonne £0.00 £95.00 + £28.00/tonne £95.00 + £28.00/tonne £0.00 £95.00 + £28.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £28.00/tonne £0.00 £210.00 + £28.00/tonne £210.00 + £28.00/tonne £0.00 £210.00 + £28.00/tonne
COMMERCIAL FOOD WASTE COMMERCIAL SKIP HIRE (UP TO 16 CUBE)
Zone
1  -  Up to 5 miles from Friarton £38.00 + £21.00/tonne £0.00 £38.00 + £21.00/tonne £38.00 + £21.00/tonne £0.00 £38.00 + £21.00/tonne
2  -  Between 5 and 20 miles from Friarton £95.00 + £21.00/tonne £0.00 £95.00 + £21.00/tonne £95.00 + £21.00/tonne £0.00 £95.00 + £21.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £210.00 + £21.00/tonne £0.00 £210.00 + £21.00/tonne £210.00 + £21.00/tonne £0.00 £210.00 + £21.00/tonne
COMMERCIAL SKIP HIRE - BLACK BAG GENERAL WASTE (35 and 40 CUBE)
Zone
1  -  Up to 5 miles from Friarton £48.00 + £136.50/tonne £0.00 £48.00 + £136.50/tonne £48.00 + £136.50/tonne £0.00 £48.00 + £136.50/tonne
2  -  Between 5 and 20 miles from Friarton £135.00 + £136.50/tonne £0.00 £135.00 + £136.50/tonne £135.00 + £136.50/tonne £0.00 £135.00 + £136.50/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £285.00 + £136.50/tonne £0.00 £285.00 + £136.50/tonne £285.00 + £136.50/tonne £0.00 £285.00 + £136.50/tonne
COMMERCIAL SKIP HIRE - BULKY GENERAL WASTE (35 and 40 CUBE)
Zone
1  -  Up to 5 miles from Friarton £48.00 + £166.00/tonne £0.00 £48.00 + £166.00/tonne £48.00 + £171.00/tonne £0.00 £48.00 + £171.00/tonne
2  -  Between 5 and 20 miles from Friarton £135.00 + £166.00/tonne £0.00 £135.00 + £166.00/tonne £135.00 + £171.00/tonne £0.00 £135.00 + £171.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £285.00 + £166.00/tonne £0.00 £285.00 + £166.00/tonne £285.00 + £171.00/tonne £0.00 £285.00 + £171.00/tonne
Page 81 of 162

Page 82

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
COMMERCIAL SKIP HIRE - WUDS BULKY GENERAL WASTE (35 and 40 CUBE)
Zone
1  -  Less than 5 miles from Friarton £48.00 + £270.20/tonne £0.00 £48.00 + £270.20/tonne £48.00 + £270.20/tonne £0.00 £48.00 + £270.20/tonne
2  -  Between 5 and 20 miles from Friarton £135.00 + £270.20/tonne £0.00 £135.00 + £270.20/tonne £135.00 + £270.20/tonne £0.00 £135.00 + £270.20/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £285.00 + £270.20/tonne £0.00 £285.00 + £270.20/tonne £285.00 + £270.20/tonne £0.00 £285.00 + £270.20/tonne
COMMERCIAL SKIP HIRE - MIXED PLASTICS AND TINS (35 AND 40 CUBE)
Zone
1  -  Up to 5 miles from Friarton £48.00 + £21.50/tonne £0.00 £48.00 + £21.50/tonne £48.00 + £45.00/tonne £0.00 £48.00 + £45.00/tonne
2  -  Between 5 and 20 miles from Friarton £135.00 + £21.50/tonne £0.00 £135.00 + £21.50/tonne £135.00 + £45.00/tonne £0.00 £135.00 + £45.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £285.00 + £21.50/tonne £0.00 £285.00 + £21.50/tonne £285.00 + £45.00/tonne £0.00 £285.00 + £45.00/tonne
COMMERCIAL SKIP HIRE - PAPER AND CARDBOARD (35 and 40 CUBE)
Zone
1  -  Up to 5 miles from Friarton £48.00 + £28.00/tonne £0.00 £48.00 + £28.00/tonne £48.00 + £28.00/tonne £0.00 £48.00 + £28.00/tonne
2  -  Between 5 and 20 miles from Friarton £135.00 + £28.00/tonne £0.00 £135.00 + £28.00/tonne £135.00 + £28.00/tonne £0.00 £135.00 + £28.00/tonne
3  -  Over 20 miles from Friarton but within PKC boundary £285.00 + £28.00/tonne £0.00 £285.00 + £28.00/tonne £285.00 + £28.00/tonne £0.00 £285.00 + £28.00/tonne
COMMERCIAL AND HOUSEHOLD SKIP EXCESS HIRE CHARGE
Small Skips (8 / 10 / 12 / 16 Cube) - All Locations
Large Skips (35 / 40 Cube) - All Locations
Account Customers (Commercial Waste Uplifts) - All Locations
BLACK BAG GENERAL WASTE TIPPING AT RECYCLING CENTRES
Category 1 - Light Van -  Part Load £30.38 £6.07 £36.45 £30.76 £6.14 £36.90
Category 1 - Light Van -  Full Load £60.71 £12.14 £72.85 £61.50 £12.30 £73.80
Category 2 - Panel Van or Small Trailer (up to 1/2 tonne) - Part Load £44.71 £8.94 £53.65 £45.21 £9.04 £54.25
Category 2 - Panel Van or Small Trailer (up to 1/2 tonne) - Full Load £89.42 £17.88 £107.30 £90.42 £18.08 £108.50
Category 3 - Large Trailer (over 1/2 tonne) - Part Load £48.79 £9.76 £58.55 £49.33 £9.87 £59.20
Category 3 - Large Trailer (over 1/2 tonne) - Full Load £97.58 £19.52 £117.10 £98.67 £19.73 £118.40
BULKY GENERAL WASTE TIPPING AT RECYCLING CENTRES
Category 1 - Light Van -  Part Load £36.79 £7.36 £44.15 £38.96 £7.79 £46.75
Category 1 - Light Van -  Full Load £73.54 £14.71 £88.25 £77.92 £15.58 £93.50
Category 2 - Panel Van or Small Trailer (up to 1/2 tonne) - Part Load £54.21 £10.84 £65.05 £57.42 £11.48 £68.90
Category 2 - Panel Van or Small Trailer (up to 1/2 tonne) - Full Load £108.42 £21.68 £130.10 £114.79 £22.96 £137.75
Category 3 - Large Trailer (over 1/2 tonne) - Part Load £59.21 £11.84 £71.05 £62.71 £12.54 £75.25
Category 3 - Large Trailer (over 1/2 tonne) - Full Load £118.33 £23.67 £142.00 £125.33 £25.07 £150.40
28 Days of skip on site will be allowed within 7 day hire charge (listed above) 28 Days of skip on site will be allowed within 7 day hire charge (listed above)
Full 7 day hire charge (listed above) will be
applied for each additional 7 days or part thereof
Full 7 day hire charge (listed above) will be
applied for each additional 7 days or part thereof
Page 82 of 162

Page 83

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
WUDS BULKY GENERAL WASTE TIPPING AT RECYCLING CENTRES
Category 1 - Light Van -  Part Load £59.21 £11.84 £71.05 £59.29 £11.86 £71.15
Category 1 - Light Van -  Full Load £118.42 £23.68 £142.10 £118.54 £23.71 £142.25
Category 2 - Panel Van or Small Trailer (up to 1/2 tonne) - Part Load £87.58 £17.52 £105.10 £87.67 £17.53 £105.20
Category 2 - Panel Van or Small Trailer (up to 1/2 tonne) - Full Load £175.17 £35.03 £210.20 £175.29 £35.06 £210.35
Category 3 - Large Trailer (over 1/2 tonne) - Part Load £95.71 £19.14 £114.85 £95.75 £19.15 £114.90
Category 3 - Large Trailer (over 1/2 tonne) - Full Load £191.33 £38.27 £229.60 £191.50 £38.30 £229.80
GARDEN WASTE TIPPING AT RECYCLING CENTRES
Category 1 - Light Van -  Part Load £9.21 £1.84 £11.05 £10.12 £2.03 £12.15
Category 1 - Light Van - Full Load £18.29 £3.66 £21.95 £20.21 £4.04 £24.25
Category 2 - Panel Van or Small Trailer (up to 1/2 tonne) - Part Load £11.96 £2.39 £14.35 £13.17 £2.63 £15.80
Category 2 - Panel Van or Small Trailer (up to 1/2 tonne) - Full Load £23.92 £4.78 £28.70 £26.29 £5.26 £31.55
Category 3 - Large Trailer (over 1/2 tonne) - Part Load £17.67 £3.53 £21.20 £19.50 £3.90 £23.40
Category 3 - Large Trailer (over 1/2 tonne) - Full Load £35.29 £7.06 £42.35 £38.96 £7.79 £46.75
INERT WASTE TIPPING AT RECYCLING CENTRES
Category 1 - Light Van -  Part Load £9.46 £1.89 £11.35 £10.29 £2.06 £12.35
Category 1 - Light Van - Full Load £18.92 £3.78 £22.70 £20.54 £4.11 £24.65
Category 2 - Panel Van or Small Trailer (up to 1/2 tonne) - Part Load £12.67 £2.53 £15.20 £13.71 £2.74 £16.45
Category 2 - Panel Van or Small Trailer (up to 1/2 tonne) - Full Load £25.25 £5.05 £30.30 £27.33 £5.47 £32.80
Category 3 - Large Trailer (over 1/2 tonne) - Part Load £13.92 £2.78 £16.70 £15.04 £3.01 £18.05
Category 3 - Large Trailer (over 1/2 tonne) - Full Load £27.79 £5.56 £33.35 £30.04 £6.01 £36.05
TIMBER WASTE TIPPING AT RECYCLING CENTRES
Category 1 - Light Van - Full Load £4.96 £0.99 £5.95 £5.96 £1.19 £7.15
Category 2 - Panel Van or Small Trailer (up to 1/2 tonne) - Full Load £8.33 £1.67 £10.00 £10.29 £2.06 £12.35
Category 3 - Large Trailer (over 1/2 tonne) - Full Load £11.67 £2.33 £14.00 £14.54 £2.91 £17.45
FRIARTON WEIGHBRIDGE (PER TONNE)
Inert Waste £24.00/tonne £4.80/tonne £28.80/tonne £24.15/tonne £4.83/tonne £28.98/tonne
Garden Waste £39.50/tonne £7.90/tonne £47.40/tonne £39.50/tonne £7.90/tonne £47.40/tonne
General Black Bag Waste £136.50/tonne £27.30/tonne £163.80/tonne £136.50/tonne £27.30/tonne £163.80/tonne
Bulky General Waste £166.00/tonne £33.20/tonne £199.20/tonne £171.00/tonne £34.20/tonne £205.20/tonne
Timber Waste £11.00/tonne £2.20/tonne £13.20/tonne £11.00/tonne £2.20/tonne £13.20/tonne
WUDS Bulky General Waste £270.21/tonne £54.04/tonne £324.25/tonne £270.21/tonne £54.04/tonne £324.25/tonne
NOTES
1 Commercial skip hire charges will be Outwith Scope for VAT.
2 Domestic/Household skip hire charges will be liable for Standard Rate VAT charge.
3 Bulky General Waste - examples include: furniture, sofa, chair, bed, mattress, white goods etc.
4 Contaminated Paper and Card / MPT skips will be charged at General Black Bag Waste rates.
5 WUDS (Waste Upholstered Domestic Seating) - examples include: sofa/sofa beds, armchairs, office chairs, kitchen/dining room chairs, recliners, floor and futons.
Page 83 of 162

Page 84

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
2:   NORTH INCH GOLF COURSE CHARGES
FULL SEASON TICKET (7 DAY TICKET) - 1ST APRIL - 31ST MARCH
Adult £409.00 £0.00 £409.00 £419.00 £0.00 £419.00
Senior/Concession £359.00 £0.00 £359.00 £369.00 £0.00 £369.00
Youth (18 - 21yrs) £99.00 £0.00 £99.00 £105.00 £0.00 £105.00
Intermediate (22 - 25yrs) £160.00 £0.00 £160.00 £169.00 £0.00 £169.00
Young Adult (26 -29yrs) £259.00 £0.00 £259.00 £269.00 £0.00 £269.00
Junior (17 yrs and under) £20.00 £0.00 £20.00 £20.00 £0.00 £20.00
Senior (80+ yrs) £259.00 £0.00 £259.00 £269.00 £0.00 £269.00
Senior (90+ yrs) £20.00 £0.00 £20.00 £20.00 £0.00 £20.00
18 MONTHS FOR THE PRICE OF 12
Adult (1st October each year) £409.00 £0.00 £409.00 £419.00 £0.00 £419.00
Senior/Concession (1st October each year) £359.00 £0.00 £359.00 £369.00 £0.00 £369.00
Young Adult (1st October each year) £259.00 £0.00 £259.00 £269.00 £0.00 £269.00
Intermediate (1st October each year) £160.00 £0.00 £160.00 £169.00 £0.00 £169.00
Youth (1st October each year) £99.00 £0.00 £99.00 £105.00 £0.00 £105.00
Junior (1st October each year) £20.00 £0.00 £20.00 £20.00 £0.00 £20.00
Senior (80+ yrs) £259.00 £0.00 £259.00 £269.00 £0.00 £269.00
Senior (90+ yrs) £20.00 £0.00 £20.00 £20.00 £0.00 £20.00
Family Membership - 1 free junior season ticket with purchase of Adult/Senior ticket £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Get into Golf - Restricted times of play on full golf course - 2 year only before upgrading £145.00 £0.00 £145.00 £150.00 £0.00 £150.00
Corporate Golf Season Ticket - golf day for up to 20 players plus 50 green fee vouchers £1,000.00 £200.00 £1,200.00 £1,000.00 £200.00 £1,200.00
SUMMER 18 HOLE ROUNDS 1ST APRIL TO 31ST OCT
Adult (weekday) £26.00 £0.00 £26.00 £28.00 £0.00 £28.00
Adult (weekend) £30.00 £0.00 £30.00 £32.00 £0.00 £32.00
Adult 10 round ticket £215.00 £0.00 £215.00 £225.00 £0.00 £225.00
One Week Multi Play Ticket £64.00 £0.00 £64.00 £69.00 £0.00 £69.00
One Month Multi Play Ticket £120.00 £0.00 £120.00 £125.00 £0.00 £125.00
Senior/Concession (weekday) £25.00 £0.00 £25.00 £26.00 £0.00 £26.00
Senior/Concession (weekend) £29.00 £0.00 £29.00 £30.00 £0.00 £30.00
Senior/Concession 10 round ticket £199.00 £0.00 £199.00 £209.00 £0.00 £209.00
Members Guest (any day) £17.00 £0.00 £17.00 £18.00 £0.00 £18.00
Twilight (weekday after 5.30pm) £23.00 £0.00 £23.00 £25.00 £0.00 £25.00
Twilight (weekend after 3pm) £25.00 £0.00 £25.00 £27.00 £0.00 £27.00
Junior (17 yrs and under weekday) £5.00 £0.00 £5.00 £5.00 £0.00 £5.00
Junior (17 yrs and under weekend) £5.00 £0.00 £5.00 £5.00 £0.00 £5.00
Short Course Adult/Senior/Concession Round £6.00 £0.00 £6.00 £6.00 £0.00 £6.00
Short Course Junior Round £3.00 £0.00 £3.00 £3.00 £0.00 £3.00
Family Ticket - 1 free junior greenfee with purchase of Adult / Senior greenfee £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Page 84 of 162

Page 85

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
SUMMER 9 HOLE ROUNDS 1ST APRIL TO 31ST OCT (1HR 45 MIN MAXIMUM PLAY)
Adult weekday £16.00 £0.00 £16.00 £16.00 £0.00 £16.00
Adult weekend £18.00 £0.00 £18.00 £18.00 £0.00 £18.00
Senior/Concession weekday £14.00 £0.00 £14.00 £14.00 £0.00 £14.00
Senior/Concession weekend £16.00 £0.00 £16.00 £16.00 £0.00 £16.00
Family Ticket - 1 free junior greenfee with purchase of Adult/Senior greenfee £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
SUMMER 6 HOLE ROUNDS 1ST APRIL TO 31ST OCT (1HR 10MINS MAXIMUM PLAY)
Adult weekday £9.00 £0.00 £9.00 £10.00 £0.00 £10.00
Adult weekend £11.00 £0.00 £11.00 £12.00 £0.00 £12.00
Senior/Concession weekday £8.00 £0.00 £8.00 £9.00 £0.00 £9.00
Senior/Concession weekend £9.00 £0.00 £9.00 £10.00 £0.00 £10.00
Family Ticket - 1 free junior greenfee with purchase of Adult/Senior greenfee £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
WINTER ROUNDS 1ST  NOV TO 31ST MARCH
Adult (any day) £18.00 £0.00 £18.00 £19.00 £0.00 £19.00
Senior/Concession (any day) £18.00 £0.00 £18.00 £19.00 £0.00 £19.00
Members Guest (any day) £9.50 £0.00 £9.50 £10.00 £0.00 £10.00
Junior (17 yrs and under any day) £5.00 £0.00 £5.00 £5.00 £0.00 £5.00
Winter Greens (all categories) £9.50 £0.00 £9.50 £10.00 £0.00 £10.00
Family Ticket - 1 free junior greenfee with purchase of Adult/Senior greenfee £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
GROUP DISCOUNT (SUMMER ONLY)
All categories (weekday -min 8 required) £24.00 £0.00 £24.00 £26.00 £0.00 £26.00
All categories (weekend -min 8 required) £26.00 £0.00 £26.00 £28.00 £0.00 £28.00
Online Adult Off Peak weekday 4 ball deal (11am-2pm) £86.00 £0.00 £86.00 £92.00 £0.00 £92.00
Online Adult Off Peak weekday 2 ball deal (11am-2pm) £48.00 £0.00 £48.00 £52.00 £0.00 £52.00
Online Adult Off Peak weekend 4 ball deal (11am-2pm) £98.00 £0.00 £98.00 £104.00 £0.00 £104.00
Online Adult Off Peak weekend 2 ball deal (11am-2pm) £54.00 £0.00 £54.00 £57.00 £0.00 £57.00
MISCELLANEOUS
- Trolley HireTrolley Hire £4.17 £0.83 £5.00 £4.17 £0.83 £5.00
- Buggy HireBuggy Hire £15.42 £3.08 £18.50 £16.67 £3.33 £20.00
- PuttingPutting £1.50 £0.00 £1.50 £1.60 £0.00 £1.60
- FootballFootball Hire £0.83 £0.17 £1.00 £0.83 £0.17 £1.00
FOOTGOLF / SOFTBALL GOLF / PARK GOLF ROUNDS 1ST APRIL TO 31ST MAR
Footgolf Adult 9 holes £7.00 £0.00 £7.00 £7.00 £0.00 £7.00
Footgolf Adult 18 holes £10.00 £0.00 £10.00 £10.00 £0.00 £10.00
Footgolf Senior/Concession 9 holes £6.00 £0.00 £6.00 £6.00 £0.00 £6.00
Footgolf Senior/Concession 18 holes £9.00 £0.00 £9.00 £9.00 £0.00 £9.00
Footgolf Junior 9 holes £4.00 £0.00 £4.00 £4.00 £0.00 £4.00
Footgolf Junior 18 holes £5.00 £0.00 £5.00 £5.00 £0.00 £5.00
Footgolf Family 9 holes (2x Adults and 2x Juniors) £16.00 £0.00 £16.00 £16.00 £0.00 £16.00
Footgolf Family 18 holes (2x Adults and 2x Juniors) £20.00 £0.00 £20.00 £20.00 £0.00 £20.00
Page 85 of 162

Page 86

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
FOOTGOLF / SOFTBALL GOLF / PARK GOLF GROUPS AND PROMOTIONS 1ST APRIL TO 31ST MAR
Footgolf Adult 4 ball deal 9 holes £22.00 £0.00 £22.00 £22.00 £0.00 £22.00
Footgolf Adult 4 ball deal 18 holes £30.00 £0.00 £30.00 £30.00 £0.00 £30.00
Footgolf Adult Group 18 holes (min 8 required) £7.00 £0.00 £7.00 £7.00 £0.00 £7.00
Footgolf Senior/Concession Group 18 holes (min 8 required) £6.00 £0.00 £6.00 £6.00 £0.00 £6.00
Footgolf Junior Group 18 holes (min 8 required) £4.00 £0.00 £4.00 £4.00 £0.00 £4.00
Note 1: some flexibility may be applied in daily green fee rates depending on demand and capacity.
Note 2: Catering for groups or parties - indoor facilities (free of charge) on request
dependent on availability, catering will be outsourced to a third party supplier to be
paid directly by the group/customer.
3:   FOOTBALL PITCHES AND PARKS EVENTS CHARGES
PERTH FOOTBALL / RUGBY PITCHES
Adult (Season 11 a-side incl changing facilities where available and training) £0.00 £0.00 £0.00 £619.00 £0.00 £619.00
Adult (Per Game 11 a-side) £0.00 £0.00 £0.00 £51.00 £0.00 £51.00
Adult (Season 7 a-side) £0.00 £0.00 £0.00 £360.00 £0.00 £360.00
Adult (Per Game 7 a-side) £0.00 £0.00 £0.00 £30.00 £0.00 £30.00
Junior Under 18 Years (Season 11 a-side incl changing facilities where available and training) £0.00 £0.00 £0.00 £258.00 £0.00 £258.00
Junior Under 18 Years (Per Game 11 a-side) £0.00 £0.00 £0.00 £20.00 £0.00 £20.00
Junior Under 18 Years (Season 7 a-side) £0.00 £0.00 £0.00 £155.00 £0.00 £155.00
Junior Under 18 Years (Per Game 7 a-side) £0.00 £0.00 £0.00 £12.00 £0.00 £12.00
OUTWITH PERTH FOOTBALL / RUGBY PITCHES
Adult (Season 11 a-side incl changing facilities where available and training) £0.00 £0.00 £0.00 £472.00 £0.00 £472.00
Adult (Per Game 11 a-side) £0.00 £0.00 £0.00 £40.00 £0.00 £40.00
Junior Under 18 Years (Season 11 a-side incl changing facilities where available and training) £0.00 £0.00 £0.00 £234.00 £0.00 £234.00
Junior Under 18 Years (Per Game 11 a-side) £0.00 £0.00 £0.00 £19.00 £0.00 £19.00
Junior Under 18 Years (Season 7 a-side) £0.00 £0.00 £0.00 £117.00 £0.00 £117.00
Junior Under 18 Years (Per Game 7 a-side) £0.00 £0.00 £0.00 £10.00 £0.00 £10.00
PARKS EVENTS
Commercial Bookings Per Day (North Inch, South Inch and Lesser South Inch) £382.00 £0.00 £382.00 £397.00 £0.00 £397.00
Commercial Bookings Per Day (Other parks and opens spaces across Perth and Kinross) £156.00 £0.00 £156.00 £162.00 £0.00 £162.00
Commercial Bookings Refundable Deposit (subject to recovery of any costs incurred) £568.00 £0.00 £568.00 £591.00 £0.00 £591.00
Non Commercial Bookings (up to 100 expected attendees) £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Non Commercial Bookings (101 to 500 expected attendees) £63.00 £0.00 £63.00 £66.00 £0.00 £66.00
Non Commercial Bookings (501 to 1000 expected attendees) £95.00 £0.00 £95.00 £99.00 £0.00 £99.00
Non Commercial Bookings (1000+ expected attendees) £126.00 £0.00 £126.00 £131.00 £0.00 £131.00
Balloon Flights £26.00 £0.00 £26.00 £27.00 £0.00 £27.00
Page 86 of 162

Page 87

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
Small Enterprise Commercial Bookings £65.00 £0.00 £65.00 £68.00 £0.00 £68.00
Water Supply Test and Flush (Prior to event) - see Note 4 £210.00 £0.00 £210.00 £218.00 £0.00 £218.00
Refundable Deposit For Large Events (Reinstatement Works) £5,000.00 £0.00 £5,000.00 £5,000.00 £0.00 £5,000.00
Facilities Cleaning Recharge Full Cost Recovery Full Cost Recovery Full Cost Recovery Full Cost Recovery Full Cost Recovery Full Cost Recovery
Mobile Food Operators - fee per month £156.00 £0.00 £156.00 £162.00 £0.00 £162.00
Non-commercial bookings = £25   
Commercial bookings = 25% of booking fee
Note 4: Water Supply Test and Flush only available where there is a water supply on site.
4:   MISCELLANEOUS CHARGES
Caravan Rallies - Outwith Caravan Parks Per Van Per Night £9.17 £1.83 £11.00 £10.00 £2.00 £12.00
Liberation of Pigeons - Per vehicle £25.83 £5.17 £31.00 £26.67 £5.33 £32.00
Compound / Off-Site Parking - Fee Per Vehicle, Per Day £0.00 £0.00 £0.00 £10.00 £2.00 £12.00
Purchase of Memorial Bench (with plaque) - New Glen Almond Bench £818.33 £163.67 £982.00 £862.50 £172.50 £1,035.00
Purchase of Memorial Bench (with plaque) - New Glen Clova Bench £1,020.00 £204.00 £1,224.00 £1,070.83 £214.17 £1,285.00
Purchase of Memorial Bench (with plaque) - Greenspace Bench £627.50 £125.50 £753.00 £637.50 £127.50 £765.00
Purchase of Memorial Bench (with plaque) - Phoenix Recycled Plastic Bench £746.67 £149.33 £896.00 £785.83 £157.17 £943.00
Purchase of Plaque - For Existing Bench (includes plaque, fitting and £175.00 £35.00 £210.00 £181.67 £36.33 £218.00
contribution to cost of bench)
Purchase of Memorial Tree (including planting - see note 3) Cost Recovery £0.00 Cost Recovery Cost Recovery £0.00 Cost Recovery
Note 1: Purchase of a memorial bench covers the life of the bench only.
Note 2: Memorial bench is supplied with brass plaque as standard
- stainless steel plaque will incur additional charge.
Note 3: Memorial Tree - charges will be recharge of costs 
- quotations supplied depending on tree variety etc.
Note 1:  Football / Rugby Pitches - 20% discount will be given for Season bookings if
paid in one payment by specified cut-off date.
Note 2: Event Parking  -  25% of all parking charges levied by event organisers will be
passed to the Council where vehicles have been parked on public greenspace.
Note 3: Event Bookings - late bookings will incur a surcharge:
Note 5: Commercial/Non-Commercial Bookings - Park/open space hire charges are VAT
exempt where the hire does not unfairly restrict space available for public recreation,
and unless the hire is solely for use as off-street parking.   Hires requiring public access
is temporarily removed or if hire is solely for use as off-street parking standard rate VAT
will be added to the hire charge.
Page 87 of 162

Page 88

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
5:   BEREAVEMENT SERVICES - BURIAL CHARGES
SALE OF LAIRS
Full Lair - Young Person (under 21yrs) £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Full Lair - Adult (21yrs and over) * £1,000.00 £0.00 £1,000.00 £1,040.00 £0.00 £1,040.00
Half Lair (where available) - Young Person (under 21yrs) £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Half Lair (where available) - Adult (21yrs and over) * £500.00 £0.00 £500.00 £520.00 £0.00 £520.00
Quarter Lair (where available) - For Baby or NVF only -  Young Person (under 21yrs) £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Transfer of Lair Ownership £42.00 £0.00 £42.00 £44.00 £0.00 £44.00
INTERMENT FEES
Young Person (under 21yrs) £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Adult (21yrs and over) - Note 1 £1,043.00 £0.00 £1,043.00 £1,085.00 £0.00 £1,085.00
Cremated Remains (Casket Burial) - Note 1 £241.00 £0.00 £241.00 £251.00 £0.00 £251.00
Scattered Ashes (under turf) - Note 1 £78.00 £0.00 £78.00 £81.00 £0.00 £81.00
Muslim Burial (Where additional requirements apply) Cost Recovery Cost Recovery Cost Recovery Cost Recovery Cost Recovery Cost Recovery
Exhumation - Note 2 Cost Recovery Cost Recovery Cost Recovery Cost Recovery Cost Recovery Cost Recovery
Excavation of Foundation for Erecting Headstone (New/On Request) - Note 3 £170.83 £34.17 £205.00 £177.50 £35.50 £213.00
Removal of Old Foundation (Prior to excavation of new foundation/headstone) £20.83 £4.17 £25.00 £21.67 £4.33 £26.00
Marking Grave for Placement of Small Memorial/ Grave Location Request - Note 4 £80.83 £16.17 £97.00 £84.17 £16.83 £101.00
Memorial Mason Registration - Annual Charge £193.00 £0.00 £193.00 £201.00 £0.00 £201.00
Memorial Mason Registration - Charge Per Visit £40.00 £0.00 £40.00 £42.00 £0.00 £42.00
Memorial Levy £79.00 £0.00 £79.00 £82.00 £0.00 £82.00
Purchase of Memorial Bench (includes installation - see note 5) - Glen Isla Bench £889.17 £177.83 £1,067.00 £925.00 £185.00 £1,110.00
Purchase of Memorial Tree (including planting - see note 6) Cost Recovery £0.00 Cost Recovery Cost Recovery £0.00 Cost Recovery
Search Fee - Per half hour charge £29.00 £0.00 £29.00 £30.00 £0.00 £30.00
Note 1: No charge for young person under 21yrs and for PKC resident under 26yrs who are entitled to after care services.
Note 2: Exhumation is VAT Exempt if for burial at another site, otherwise it is Standard Rate VAT.
Note 3: Excavation of Foundation for Headstone is Standard Rate VAT, unless required to carry out interment or burial
but where that is required PKC do not charge separately as that service is included within the overall Interment Fee.
Note 4: Marking Grave for Memorials or location requests is Standard Rate VAT.  Grave marking required for
interment/burials is Exempt for VAT - PKC include this service within the overall Interment Fee.
Note 5: Purchase of a memorial bench and plaque covers the life of the bench only. Specific bench type cannot
be guaranteed, dependent on availability of supply.
Note 6: Memorial Tree - Charges will be recharge of costs - quotations supplied depending on tree variety etc.
Page 88 of 162

Page 89

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
6:   BEREAVEMENT SERVICES - CREMATION CHARGES
CREMATION
Adult (21yrs and over) *
Young Person (under 21yrs) £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
£870.00 £0.00 £870.00 £905.00 £0.00 £905.00
Direct Cremation (08:45am or 9.00am / No Service) * £553.00 £0.00 £553.00 £575.00 £0.00 £575.00
Abatement Levy (excluding young person under 21yrs) * £103.00 £0.00 £103.00 £103.00 £0.00 £103.00
Scattering of Ashes (Service at Perth) * £28.00 £0.00 £28.00 £29.00 £0.00 £29.00
Scattering of Ashes (Service at External Crematorium) * £68.00 £0.00 £68.00 £71.00 £0.00 £71.00
Scattering of Ashes (Under turf) * £78.00 £0.00 £78.00 £81.00 £0.00 £81.00
Extended Service £317.00 £0.00 £317.00 £330.00 £0.00 £330.00
* No charge for young person under 21yrs and for PKC resident
under 26yrs who are entitled to after care services.
OBITUS MEDIA SERVICES AND PRODUCTS
Tributes
Single Photo - Free of Charge £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Basic Slideshow - Photo slideshow of up to 25 photos £45.83 £9.17 £55.00 £47.50 £9.50 £57.00
Music Tribute - Tribute of up to 25 photos timed to chosen music £66.67 £13.33 £80.00 £69.17 £13.83 £83.00
Themed Tribute - Up to 25 photos professionally edited and timed from a range of £82.50 £16.50 £99.00 £85.83 £17.17 £103.00
curated themes and music
Bespoke Tribute - Professionally crafted bespoke tribute
Tributes Extra's
Extra Single Photo - Surcharge for any additional holding images beyond the single photo £11.67 £2.33 £14.00 £12.50 £2.50 £15.00
Tribute Download £11.67 £2.33 £14.00 £12.50 £2.50 £15.00
Extra Tribute Photo's - For each extra 25 photo's on a visual tribute £20.83 £4.17 £25.00 £21.67 £4.33 £26.00
Extra Work Charge - Fee applied to any standard products for additional work £19.17 £3.83 £23.00 £20.00 £4.00 £24.00
(eg adding video to a tribute)
Family Supplied Tribute - Family supplied video/photo tribute used as received with £25.83 £5.17 £31.00 £26.67 £5.33 £32.00
basic quality checks
Late Fees - Applied where amendments requested after submission deadlines £20.00 £4.00 £24.00
Streaming
Live and On Demand - Professionally live streamed service link available to
view online for 28 days:
Live Stream £38.00 £0.00 £38.00 £40.00 £0.00 £40.00
On Demand - online for 28 days £18.33 £3.67 £22.00 £19.17 £3.83 £23.00
See Note 2
Pending - in development Pending - in development
Page 89 of 162

Page 90

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
Keepsakes
DVD or USB - DVD or USB copy of service, tribute or both in personalised grey linen case £51.67 £10.33 £62.00 £54.17 £10.83 £65.00
Video Book - Portable video of service, tribute or both set in A5 electronic screen £82.50 £16.50 £99.00 £85.83 £17.17 £103.00
encased in linen-wrapped 'book'
Memory Box - Up to 25 photos professionally printed and delivered in linen-wrapped box £115.83 £23.17 £139.00 £120.83 £24.17 £145.00
Digital download and link to recorded service £47.50 £9.50 £57.00
Keepsakes Extra's
Blu-Ray or Audio CD - Blu-Ray or audio CD copy of live stream/tribute or both
wrapped in personalised linen box
Second Copies - Any additional copies of DVD or USB keepsakes £25.00 £5.00 £30.00 £25.83 £5.17 £31.00
Bundles
Obitus Bundle - Single photo + Music Tribute + Livestream + 1 keepsake item:
Bundle (discounted) - Single photo + music tribute + 1 keepsake item
Bundle (discounted) - Livestream
Discounted charges only applicable when purchased as part of the full bundle - see
Note 2
Services for Young People (Under 18)
Live and On Demand + Single Photo + Basic Slideshow up to 25 photos - Free of Charge £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
NOTES
1 Obitus media services and product offers may be subject to change.
2 Livestream is exempt from VAT - grouped/bundled/discounted charges are listed
inidividually to reflect the 'multiple supply' elements for VAT invoice purposes only,
these charges are only applicable when the full bundle offer is purchased.
MEMORIAL OPTIONS
Book of Remembrance (2 line entry) £57.50 £11.50 £69.00 £60.00 £12.00 £72.00
Book of Remembrance (5 line entry) £91.67 £18.33 £110.00 £95.83 £19.17 £115.00
Book of Remembrance (8 line entry) £128.33 £25.67 £154.00 £133.33 £26.67 £160.00
Miniature Books of Remembrance (2 line entry) £102.50 £20.50 £123.00 £106.67 £21.33 £128.00
Miniature Books of Remembrance (5 line entry) £135.83 £27.17 £163.00 £141.67 £28.33 £170.00
Miniature Books of Remembrance (8 line entry) £176.67 £35.33 £212.00 £183.33 £36.67 £220.00
Memorial Cards (2 line entry) £71.67 £14.33 £86.00 £74.17 £14.83 £89.00
Memorial Cards (5 line entry) £115.83 £23.17 £139.00 £120.83 £24.17 £145.00
Memorial Cards (8 line entry) £145.00 £29.00 £174.00 £150.83 £30.17 £181.00
Memorial Cards (Photograph) £71.67 £14.33 £86.00 £74.17 £14.83 £89.00
Memorial Cards (Family Crest) £71.67 £14.33 £86.00 £74.17 £14.83 £89.00
Memorial Cards (Floral Motif) £71.67 £14.33 £86.00 £74.17 £14.83 £89.00
Memorial Cards (Coat of Arms) £71.67 £14.33 £86.00 £74.17 £14.83 £89.00
Caskets £69.17 £13.83 £83.00 £71.67 £14.33 £86.00
Pending - in development Pending - in development
Available on request Available on request
Pending - in development Pending - in development
Page 90 of 162

Page 91

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
LEASE OF MEMORIALS
Granite Tower Plaque - 10 year lease £152.00 £0.00 £152.00 £158.00 £0.00 £158.00
Granite Tower Plaque - 20 year lease £235.00 £0.00 £235.00 £245.00 £0.00 £245.00
Grey Granite Kerb - 10 year lease £325.00 £0.00 £325.00 £338.00 £0.00 £338.00
Grey Granite Kerb - 20 year lease £468.00 £0.00 £468.00 £487.00 £0.00 £487.00
Red Granite Flower Kerb - 10 year lease £325.00 £0.00 £325.00 £338.00 £0.00 £338.00
Red Granite Flower Kerb - 20 year lease £468.00 £0.00 £468.00 £487.00 £0.00 £487.00
Black Granite Flower Kerb - 10 year lease £325.00 £0.00 £325.00 £338.00 £0.00 £338.00
Black Granite Flower Kerb - 20 year lease £468.00 £0.00 £468.00 £487.00 £0.00 £487.00
Granite Mother of Pearl - 10 year lease £501.00 £0.00 £501.00 £521.00 £0.00 £521.00
Granite Mother of Pearl - 20 year lease £756.00 £0.00 £756.00 £786.00 £0.00 £786.00
Upright Granite Memorial - 10 year lease £327.00 £0.00 £327.00 £343.00 £0.00 £343.00
Upright Granite Memorial - 20 year lease £474.00 £0.00 £474.00 £500.00 £0.00 £500.00
Octagonal Wall Plaque - 10 year lease £181.00 £0.00 £181.00 £188.00 £0.00 £188.00
Octagonal Wall Plaque - 20 year lease £307.00 £0.00 £307.00 £320.00 £0.00 £320.00
Granite Columbarium Tower - Single - 10 year lease £303.00 £0.00 £303.00 £315.00 £0.00 £315.00
Granite Columbarium Tower - Double - 10 year lease £600.00 £0.00 £600.00 £624.00 £0.00 £624.00
Granite Columbarium Tower - Single - 20 year lease £434.00 £0.00 £434.00 £452.00 £0.00 £452.00
Granite Columbarium Tower - Double - 20 year lease £861.00 £0.00 £861.00 £896.00 £0.00 £896.00
Children's Granite Bench Plaque - 20 year lease £290.00 £0.00 £290.00 £302.00 £0.00 £302.00
Red Granite Boulder - 10 year lease £254.00 £0.00 £254.00 £265.00 £0.00 £265.00
Red Granite Boulder - 20 year lease £406.00 £0.00 £406.00 £423.00 £0.00 £423.00
SALE OF MEMORIALS (Sold in perpetuity - children's memorials only)
Granite Children's Mushroom Including Inscription* £197.50 £39.50 £237.00 £205.00 £41.00 £246.00
Children's Butterfly Plaque Including Inscription* £202.50 £40.50 £243.00 £210.83 £42.17 £253.00
Children's Tree of Life Memorial Plaque Including Inscription* £253.33 £50.67 £304.00 £263.33 £52.67 £316.00
Inscription Per Letter £2.25 £0.45 £2.70 £2.35 £0.47 £2.82
Renewal of all leases for further period 75% of Lease Charge 75% of Lease Charge
Purchase of Memorial Bench (includes installation) - Glen Isla Bench £889.17 £177.83 £1,067.00 £925.00 £185.00 £1,110.00
Bench Memorial Plaque (includes installation) - Up to 50 Letters £125.00 £25.00 £150.00 £130.00 £26.00 £156.00
Bench Memorial Plaque Additional Letters - For each 3 added letters £0.83 £0.17 £1.00 £0.83 £0.17 £1.00
Purchase of Memorial Tree (including planting - see note 3) Cost Recovery Cost Recovery Cost Recovery Cost Recovery Cost Recovery Cost Recovery
Note 1: Lease of memorials is VAT Exempt, sale of memorials is Standard Rate VAT.
Note 2: Purchase of a memorial bench and plaque covers the life of the bench only.
Specific bench type cannot be guaranteed, dependent on availability of supply.
Note 3: Memorial Tree - Charges will be recharge of costs - quotations supplied
depending on tree variety etc.
Page 91 of 162

Page 92

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
7:   FLEET CHARGES
MOT
Class 4 - Car (Up to 8 passenger seats) £54.85 £0.00 £54.85 £54.85 £0.00 £54.85
Class 5  (13-16 passenger seats) £59.55 £0.00 £59.55 £59.55 £0.00 £59.55
Class 5  (More than 16 passenger seats) £80.65 £0.00 £80.65 £80.65 £0.00 £80.65
Class 7 (Up to 3.5 tonnes) £58.60 £0.00 £58.60 £58.60 £0.00 £58.60
Training
CPC / Various £59.17 £11.83 £71.00 £59.17 £11.83 £71.00
Midas - Standard £83.33 £16.67 £100.00 £83.33 £16.67 £100.00
Midas - Accessible £163.33 £32.67 £196.00 £163.33 £32.67 £196.00
8:   SMOKING CHARGES
Fixed Penalty Notice - issued to a person having the management or control of £200.00 £0.00 £200.00 £200.00 £0.00 £200.00
no-smoking premises, you permitted another person to smoke within those premises
(Part 1, Section 1)*
If paid within 14 days from the day after this Notice was issued (Section 1 and 3)* £150.00 £0.00 £150.00 £150.00 £0.00 £150.00
Fixed Penalty Notice - issued if you were smoking within no-smoking premises £50.00 £0.00 £50.00 £50.00 £0.00 £50.00
(Part 1, Section 2)*
If paid within 14 days from the day after this Notice was issued (Section 2)* £30.00 £0.00 £30.00 £30.00 £0.00 £30.00
Fixed Penalty Notice - issued to a person having the management or control of no-smoking £200.00 £0.00 £200.00 £200.00 £0.00 £200.00
premises, you failed to conspicuously display appropriate warning notices in, on or near
to those premises (Part 1 Section 3)*
N.B. Failure to discharge payment within 28 days from the date after the Notice was 
served will result in Perth and Kinross Council reporting the matter to the Procurator
Fiscal or instigating proceedings to recover the amount of the Notice through the
use of Sheriff Officers.
* Smoking, Health and Social Care (Scotland) Act 2005
Page 92 of 162

Page 93

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
9:   LITTER CHARGES
Fixed Penalty Notice - issued* £80.00 £0.00 £80.00 £80.00 £0.00 £80.00
Fly-Tipping £500.00 £0.00 £500.00 £500.00 £0.00 £500.00
If a fixed penalty is unpaid after the expiry of the period for paying Perth and Kinross 
Council will report the matter to the Procurator Fiscal.
*Environmental Protection Act 1990
10:   ROAD NETWORK COMMERCIAL PERMIT CHARGES
Skip Permit (S85) - per week £33.00 £0.00 £33.00 £35.00 £0.00 £35.00
Scaffolding Permit (S58) £55.00 £0.00 £55.00 £58.00 £0.00 £58.00
Road Opening Permit (S56) £160.00 £0.00 £160.00 £167.00 £0.00 £167.00
New Roads and Street Works Act (S109) - per utility, per street, per application £1,500.00 £0.00 £1,500.00 £1,500.00 £0.00 £1,500.00
Road Closure - Posting of Notices (Temporary TRO)
First Notice £875.00 £0.00 £875.00 £910.00 £0.00 £910.00
Emergency Road Closures £500.00 £0.00 £500.00 £520.00 £0.00 £520.00
Extension £400.00 £0.00 £400.00 £400.00 £0.00 £400.00
Temporary Traffic Signals
Switch Off Permanent TL's to allow for Temp TL's £135.00 £0.00 £135.00 £141.00 £0.00 £141.00
Charge per officer hour £170.00 £0.00 £170.00 £177.00 £0.00 £177.00
Rechargeable Works
Installation of 'H' Markings (householder/customer request) £450.00 £90.00 £540.00 £468.33 £93.67 £562.00
Accident Damage Works - Minimum Charge (see note 1) £120.00 £0.00 £120.00 £125.00 £0.00 £125.00
NOTES
1 Installation charge for H Markings also covers future maintenance costs.
2 Accident damage minimum charge is an administration charge which will be applied only where the actual works costs are lower than the minimum charge amount.
3 Farmers Markets will be exempt from Road Closure charges in Perth and Kinross Council area.
Page 93 of 162

Page 94

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
11:   TRADING STANDARDS CHARGES
WEIGHING AND MEASURING EQUIPMENT
Charge per officer hour £157.00 £0.00 £157.00 £163.00 £0.00 £163.00
PETROLEUM
Storage capacity
Not exceeding 2,500 litres £48.00 £0.00 £48.00 £48.00 £0.00 £48.00
2,500 to 50,000 litres £65.00 £0.00 £65.00 £65.00 £0.00 £65.00
Exceeding 50,000 litres £137.00 £0.00 £137.00 £137.00 £0.00 £137.00
EXPLOSIVES (2014 REGS)
Explosives store licence - min separation distance > 0 metres (1 year's duration) £202.00 £0.00 £202.00 £202.00 £0.00 £202.00
Explosives store licence - min separation distance > 0 metres (2 year's duration) £266.00 £0.00 £266.00 £266.00 £0.00 £266.00
Explosives store licence - min separation distance > 0 metres (3 year's duration) £333.00 £0.00 £333.00 £333.00 £0.00 £333.00
Explosives store licence - min separation distance > 0 metres (4 year's duration) £409.00 £0.00 £409.00 £409.00 £0.00 £409.00
Explosives store licence - min separation distance > 0 metres (5 year's duration) £463.00 £0.00 £463.00 £463.00 £0.00 £463.00
Renewal of store licence - min separation distance > 0 metres (1 year's duration) £94.00 £0.00 £94.00 £94.00 £0.00 £94.00
Renewal of store licence - min separation distance > 0 metres (2 year's duration) £161.00 £0.00 £161.00 £161.00 £0.00 £161.00
Renewal of store licence - min separation distance > 0 metres (3 year's duration) £226.00 £0.00 £226.00 £226.00 £0.00 £226.00
Renewal of store licence - min separation distance > 0 metres (4 year's duration) £291.00 £0.00 £291.00 £291.00 £0.00 £291.00
Renewal of store licence - min separation distance > 0 metres (5 year's duration) £357.00 £0.00 £357.00 £357.00 £0.00 £357.00
Explosives store licence - no min separation distance or 0 metres (1 year's duration) £119.00 £0.00 £119.00 £119.00 £0.00 £119.00
Explosives store licence - no min separation distance or 0 metres (2 year's duration) £154.00 £0.00 £154.00 £154.00 £0.00 £154.00
Explosives store licence - no min separation distance or 0 metres (3 year's duration) £190.00 £0.00 £190.00 £190.00 £0.00 £190.00
Explosives store licence - no min separation distance or 0 metres (4 year's duration) £226.00 £0.00 £226.00 £226.00 £0.00 £226.00
Explosives store licence - no min separation distance or 0 metres (5 year's duration) £260.00 £0.00 £260.00 £260.00 £0.00 £260.00
Renewal of store licence - no min separation distance or 0 metres (1 year's duration) £59.00 £0.00 £59.00 £59.00 £0.00 £59.00
Renewal of store licence - no min separation distance or 0 metres (2 year's duration) £94.00 £0.00 £94.00 £94.00 £0.00 £94.00
Renewal of store licence - no min separation distance or 0 metres (3 year's duration) £132.00 £0.00 £132.00 £132.00 £0.00 £132.00
Renewal of store licence - no min separation distance or 0 metres (4 year's duration) £166.00 £0.00 £166.00 £166.00 £0.00 £166.00
Renewal of store licence - no min separation distance or 0 metres (5 year's duration) £202.00 £0.00 £202.00 £202.00 £0.00 £202.00
Varying, Transferring or Replacing licence £40.00 £0.00 £40.00 £40.00 £0.00 £40.00
Dangerous wild animals Vets fee + £68.00 admin £0.00 Vets fee + £68.00 admin Vets fee + £75.00 admin £0.00 Vets fee + £75.00 admin
Zoo licence Vets fee + £68.00 admin £0.00 Vets fee + £68.00 admin Vets fee + £75.00 admin £0.00 Vets fee + £75.00 admin
Registration under performing animals regulation (one off payment) £68.00 £0.00 £68.00 £75.00 £0.00 £75.00
Animal boarding licence £220.00 £0.00 £220.00 £242.00 £0.00 £242.00
Animal welfare licence (1-3 years based on risk assessment) £220.00 £0.00 £220.00 £242.00 £0.00 £242.00
50% discount will be given for registered charities
Riding establishments licence Vets fee + £68.00 admin £0.00 Vets fee + £68.00 admin Vets fee + £75.00 admin £0.00 Vets fee + £75.00 admin
Dog Control - Forced Entry Fee (to non-PKC bodies) £50.00 £0.00 £50.00 £52.00 £0.00 £52.00
Better Business Partnership £50.00 £0.00 £50.00 £50.00 £0.00 £50.00
Page 94 of 162

Page 95

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
12:   ENVIRONMENTAL HEALTH CHARGES
£75.00 + £25.00/hour £0.00 £75.00 + £25.00/hour £78.00 + £26.00/hour £0.00 £78.00 + £26.00/hour
Non-regulated Water Sampling Risk Assessment £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
Routine Request (Visit and Analysis)* £118.00 £23.60 £141.60 £118.00 £23.60 £141.60
B2 Basic Bacto Request* £118.00 £23.60 £141.60 £118.00 £23.60 £141.60
Single Parameters (available upon request e.g. Aluminium, Copper, Iron etc) £70.00 + Analysis Cost 20% £70.00 + Analysis Cost £70.00 + Analysis Cost 20% £70.00 + Analysis Cost
Resample Charges See Notes 4 and 5 Below See Notes 4 and 5 Below
* For Non-Statutory Sampling Legislation limits maximum to £118 total charge (excl VAT) per sample visit/analysis
* For Single Parameters Legislation limits the Visit Fee to maximum £70 (excl VAT)
STATUTORY WATER SAMPLING (NO VAT FOR STATUTORY SAMPLES)
Check Monitoring (Visit and Analysis) £180.00 £0.00 £180.00 £187.00 £0.00 £187.00
Check and Audit Monitoring - reduced parameters (Visit and Analysis) £160.00 £0.00 £160.00 £160.00 £0.00 £160.00
Check and Audit Monitoring (Visit and Analysis) £457.00 £0.00 £457.00 £475.00 £0.00 £475.00
Single Parameters (available upon request e.g. Aluminium, Copper, Iron etc) Analysis Costs Analysis Costs Analysis Costs Analysis Costs
Resample Charges See Note 4 Below See Note 4 Below
Certificate of Compliance - Street Traders £113.00 £0.00 £113.00 £118.00 £0.00 £118.00
Cinema Licence - Per screen £69.00 £0.00 £69.00 £72.00 £0.00 £72.00
Export Health Certificate:-
Product Not of Animal Origin - Food Safety Premises Endorsement for Export Certificate £32.00 £0.00 £32.00 £34.00 £0.00 £34.00
Product Not of Animal Origin - Export Health Certificate £32.00 £0.00 £32.00 £34.00 £0.00 £34.00
Product Not of Animal Origin - Attestation £32.00 £0.00 £32.00 £34.00 £0.00 £34.00
Product of Animal Origin - Attestation £32.00 £0.00 £32.00 £34.00 £0.00 £34.00
Correction / Re-Issue of a Certificate £32.00 £0.00 £32.00 £34.00 £0.00 £34.00
Venison dealers licence £211.00 £0.00 £211.00 £219.00 £0.00 £219.00
Anti-Idling Fixed Penalty Notice £20.00 £0.00 £20.00 £20.00 £0.00 £20.00
Mobile Residential Homes Licences*
1 - 10 Residential Units - First Application £300.00 - £540.00 £0.00 £300.00 - £540.00 £300.00 - £560.00 £0.00 £300.00 - £560.00
1 - 10 Residential Units - Renewal Application £200.00 - £440.00 £0.00 £200.00 - £440.00 £200.00 - £460.00 £0.00 £200.00 - £460.00
11 - 20 Residential Units - First Application £594.00 - £1,080.00 £0.00 £594.00 - £1,080.00 £616.00 - £1120.00 £0.00 £616.00 - £1120.00
11 - 20 Residential Units - Renewal Application £484.00 - £880.00 £0.00 £484.00 - £880.00 £506.00 - £920.00 £0.00 £506.00 - £920.00
21 - 30 Residential Units - First Application £1,134.00 - £1,620.00 £0.00 £1,134.00 - £1,620.00 £1,176.00 - £1,680.00 £0.00 £1,176.00 - £1,680.00
21 - 30 Residential Units - Renewal Application £924.00 - £1,320.00 £0.00 £924.00 - £1,320.00 £966.00 - £1,380.00 £0.00 £966.00 - £1,380.00
31 - 40 Residential Units - First Application £1,674.00 - £2,160.00 £0.00 £1,674.00 - £2,160.00 £1,736.00 - £2,240.00 £0.00 £1,736.00 - £2,240.00
Regulated Water Sampling Risk Assessment preparatory work and visit  
(Visit Charge £72 + Hourly Rate - maximum of 7 hours)
NON-STATUTORY WATER SAMPLING (VAT APPLIES FOR
NON-STATUTORY SAMPLING)
Page 95 of 162

Page 96

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
31 - 40 Residential Units - Renewal Application £1,364.00 - £1,760.00 £0.00 £1,364.00 - £1,760.00 £1,426.00 - £1840.00 £0.00 £1,426.00 - £1840.00
41 - 50 Residential Units - First Application £2,214.00 - £2,700.00 £0.00 £2,214.00 - £2,700.00 £2,296.00 - £2,800.00 £0.00 £2,296.00 - £2,800.00
41 - 50 Residential Units - Renewal Application £1,804.00 - £2,200.00 £0.00 £1,804.00 - £2,200.00 £1,886.00 - £2,300.00 £0.00 £1,886.00 - £2,300.00
51 - 60 Residential Units - First Application £2,754.00 - £3,240.00 £0.00 £2,754.00 - £3,240.00 £2,856.00 - £3,360.00 £0.00 £2,856.00 - £3,360.00
51 - 60 Residential Units - Renewal Application £2,244.00 - £2,640.00 £0.00 £2,244.00 - £2,640.00 £2,346.00 - £2,760.00 £0.00 £2,346.00 - £2,760.00
61 - 70 Residential Units - First Application £3,294.00 - £3,780.00 £0.00 £3,294.00 - £3,780.00 £3,416.00 - £3,920.00 £0.00 £3,416.00 - £3,920.00
61 - 70 Residential Units - Renewal Application £2,684.00 - £3,080.00 £0.00 £2,684.00 - £3,080.00 £2,806.00 - £3,220.00 £0.00 £2,806.00 - £3,220.00
71 - 80 Residential Units - First Application £3,834.00 - £4,320.00 £0.00 £3,834.00 - £4,320.00 £3,976.00 - £4,480.00 £0.00 £3,976.00 - £4,480.00
71 - 80 Residential Units - Renewal Application £3,124.00 - £3,520.00 £0.00 £3,124.00 - £3,520.00 £3,266.00 - £3,680.00 £0.00 £3,266.00 - £3,680.00
81 - 90 Residential Units - First Application £4,374.00 - £4,860.00 £0.00 £4,374.00 - £4,860.00 £4,536.00 - £5,040.00 £0.00 £4,536.00 - £5,040.00
81 - 90 Residential Units - Renewal Application £3,564.00 - £3,960.00 £0.00 £3,564.00 - £3,960.00 £3,726.00 - £4,140.00 £0.00 £3,726.00 - £4,140.00
91 - 100 Residential Units - First Application £4,914.00 - £5,400.00 £0.00 £4,914.00 - £5,400.00 £5,096.00 - £5,600.00 £0.00 £5,096.00 - £5,600.00
91 - 100 Residential Units - Renewal Application £4,004.00 - £4,400.00 £0.00 £4,004.00 - £4,400.00 £4,186.00 - £4,600.00 £0.00 £4,186.00 - £4,600.00
Note 1: Mobile Residential Homes Licence - First Applications are £56 per unit or minimum £300 - Renewal Apps are £46 per unit or minimum £200.
Note 2: Mobile Residential Homes Licence valid for 5 years - then renewal required.
Note 3: No VAT is chargeable where a water sample is taken for statutory reasons.
Note 4: Regulated Water Sampling Risk Assessment - where Risk Assessment carried out / renewed at same time as sampling only one visit charge
will be applied.
Note 5: Water Sample Charges - Resample charges may vary as these will be dependent on the parameters of the resample requirements.
Note 6: For Non-Statutory Sampling only - discretionary charging but legislationlimits the maximum charge to £118 (excl VAT) per sample visit/analysis.
Note 7: Export Health Certificate replaces pre-Brexit Export Certificate - a formal national charging structure is pending, until then Local Authorities
continue to use old Export Certificate Charge amounts.
13:   DOG FOULING CHARGES
Fixed Penalty Notice - issued* £80.00 £0.00 £80.00 £80.00 £0.00 £80.00
If a fixed penalty is unpaid after the expiry of the period for paying, Perth and Kinross 
Council will report the matter to the Sheriff Officer.
*Dog Fouling (Scotland) Act 2003
Page 96 of 162

Page 97

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
14:   PARKING CHARGES
PERTH CITY PARKING
Zone 1 - Inner City Centre
On-Street (Per Hour) Max 1 hour £1.70 Max 1 hour £1.80
Off-Street (Per Hour) Max 1 hour £1.50 Max 1 hour £1.60
Zone 2 - City Centre
On-Street (Per Hour) Max 4 hours £1.70 Max 4 hours £1.80
Off-Street (Per Hour) Max 4 hours £1.50 Max 4 hours £1.60
Zone 3 - Outer City Centre
On-Street
1 Hour £1.10 £1.20
2 Hours £1.70 £1.80
3 Hours £2.60 £2.70
4 Hours £3.30 £3.40
6 Hours £5.00 £5.20
Up to 10 Hours £6.70 £7.00
Weekly Ticket (Monday - Saturday) £31.00 £32.00
Monthly Permit (Monday - Friday) £57.00 £59.00
Monthly Permit (Monday - Saturday) £85.00 £88.00
Thimblerow Car Park
1 Hour £1.50 £1.60
2 Hours £3.00 £3.10
3 Hours £4.60 £4.80
4 Hours £6.00 £6.20
6 Hours £9.20 £9.60
Up To 10 Hours £12.30 £12.80
Weekly Ticket (Monday - Saturday) £68.00 £71.00
Monthly Permit (Monday - Friday) £91.00 £95.00
Monthly Permit (Monday - Saturday) £145.00 £151.00
Canal Street MSCP
1 Hour £1.50 £1.60
2 Hours £3.00 £3.10
3 Hours £4.60 £4.80
4 Hours £6.00 £6.20
6 Hours £9.20 £9.60
Up To 10 Hours £12.30 £12.80
Weekly Ticket (Monday - Saturday) £68.00 £71.00
Monthly Permit (Monday - Friday) £91.00 £95.00
Monthly Permit (Monday - Saturday) £145.00 £151.00
Page 97 of 162

Page 98

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
South Inch Car Park
1 Hour £1.00 £1.10
2 Hours £1.50 £1.60
3 Hours £2.40 £2.50
4 Hours £3.00 £3.10
6 Hours £4.60 £4.80
Up To 10 Hours £6.00 £6.20
Weekly Ticket (Monday - Saturday) £31.00 £32.00
Monthly Permit (Monday - Friday) £57.00 £59.00
Monthly Permit (Monday - Saturday) £85.00 £88.00
Coaches (per visit) £6.20
Norrie Miller/Riverside Car Park
1 Hour £1.00 £1.10
2 Hours £1.50 £1.60
3 Hours £2.40 £2.50
4 Hours £3.00 £3.10
6 Hours £4.60 £4.80
Up To 10 Hours £6.00 £6.20
Weekly Ticket (Monday - Saturday) £31.00 £32.00
Monthly Permit (Monday - Friday) £57.00 £59.00
Monthly Permit (Monday - Saturday) £85.00 £88.00
Victoria Street Car Park
1 Hour £1.00 £1.10
2 Hours £1.50 £1.60
3 Hours £2.40 £2.50
4 Hours £3.00 £3.10
6 Hours £4.60 £4.80
Up To 10 Hours £6.00 £6.20
Weekly Ticket (Monday - Saturday) £31.00 £32.00
Monthly Permit (Monday - Friday) £57.00 £59.00
Monthly Permit (Monday - Saturday) £85.00 £88.00
Riverside Turning Head Car Park
1 Hour £1.00 £1.10
2 Hours £1.50 £1.60
3 Hours £2.40 £2.50
4 Hours £3.00 £3.10
6 Hours £4.60 £4.80
Up To 10 Hours £6.00 £6.20
Weekly Ticket (Monday - Saturday) £31.00 £32.00
Monthly Permit (Monday - Friday) £57.00 £59.00
Monthly Permit (Monday - Saturday) £85.00 £88.00
Page 98 of 162

Page 99

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
Residents Permits - Perth City Only
Inner Zone - Annual (On and within Inner Ring Road) £264.00 £264.00
Outer Zone - Annual £151.00 £151.00
CRIEFF TOWN CENTRE PARKING
On-Street (30 Mins) £1.10 £1.20
On-Street (Per Hour) Max 1 hour £1.70 Max 1 hour £1.80
Off-Street (Per Hour) - James Square Max 1 hour £1.50 Max 1 hour £1.60
Residents Permits (Annual) £166.00 £166.00
BLAIRGOWRIE TOWN CENTRE PARKING
Off-Street
Croft Lane, The Croft/Ericht Lane
1 Hour £1.30 £1.40
2 Hours £2.30 £2.40
Leslie Street
1 Hour £1.30 £1.40
2 Hours £2.30 £2.40
4 Hours £3.80 £4.00
10 Hours £5.50 £5.70
Season Ticket (Annual) £182.00 £189.00
PITLOCHRY TOWN CENTRE PARKING
Off-Street
Atholl Road, Ferry Road and Rie-Achan Road
1 Hour £1.30 £1.40
2 Hours £2.30 £2.40
4 Hours £3.80 £4.00
10 Hours £5.50 £5.70
Rie-Achan Road - Coaches per visit £5.50 £5.70
Season Ticket (Annual) £182.00 £189.00
DUNKELD TOWN CENTRE PARKING
Off-Street
Atholl Street and Tay Terrace
1 Hour £1.30 £1.40
- 2 Hours2 Hours £2.30 £2.40
- 4 Hours4 Hours £3.80 £4.00
- 10 Hours10 Hours £5.50 £5.70
Season Ticket (Annual) £182.00 £189.00
Page 99 of 162

Page 100

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
PENALTY CHARGE NOTICES (PCN)
Charge at point of issue - If paid 15 days from PCN issue up to Notice to Owner being issued £100.00 £100.00
If paid within 14 days of PCN issue (50% discount) £50.00 £50.00
If not paid after 8 weeks of issue - If paid after Charge Certificate issued (increase by 50%) £150.00 £150.00
Blue Badge Scheme - Badge Fee £20.00 £20.00
Vehicle Uplift £190.00 £0.00 £190.00 £190.00 £0.00 £190.00
Vehicle Storage (following uplift) - Per Day £25.00 £0.00 £25.00 £25.00 £0.00 £25.00
Clamping Release Fee £50.00 £0.00 £50.00 £52.00 £0.00 £52.00
UNTAXED VEHICLES (DVLA DELEGATED POWERS)
RELEASE FEES
Release fee (from clamp) £100.00 £0.00 £100.00
Release fee within 24 hours of offence (from vehicle pound) £100.00 £0.00 £100.00
Release fee after 24 hours (from vehicle pound) £200.00 £0.00 £200.00
Storage per day £21.00 £0.00 £21.00
SURETY FEE
VEHICLE TYPE
Motorcycle, light passenger and light goods vehicles £160.00 £0.00 £160.00
Buses, recovery, haulage and goods vehicles £330.00 £0.00 £330.00
Exceptional loads and heavy goods vehicles (such as lorry or bus) £700.00 £0.00 £700.00
(See Note 8)
BAY SUSPENSIONS
On Street - Per Bay Per Day £18.00 £19.00
Off Street - Per Bay Per Day £18.00 £19.00
LIVE ACTIVE LEISURE CAR PARKS
Off-Street
Rodney Pavilion
2 Hours £1.00 £1.10
3 Hours £3.80 £4.00
4 Hours £5.50 £5.70
Bells Sports Centre
2 Hours £1.00 £1.10
5 Hours £1.10 £1.20
6 Hours £5.70 £5.90
9 Hours £7.30 £7.60
PARKING CONTRAVENTIONS
Page 100 of 162

Page 101

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
CHARGING FOR ALTERNATIVE USE OF CAR PARKING SPACES
1. Council events run by Perth and Kinross Council
2. Events funded / supported by Perth and Kinross Council - charge discounted initially as
agreed by Sponsor (Head of Service / Executive Director). As the event becomes more
established then charges will be introduced as determined by the Sponsor.
3. Commercial Events - Normal charge with 50% discount applied for long term
suspensions (>14 days)
4. Charitable Events
PARKING DISPENSATION
Per Vehicle Per Day (with prior approval from PKC Parking Services) £25.00 £0.00 £25.00 £26.00 £0.00 £26.00
CHARGES FOR CONES AND NOTICES
(Internal Fees - see Note 7)
Deployment and Collection of Cones/Notices
First Hour (1 vehicle and 1 operative - max 90 cones) £312.00 £325.00 £0.00 £325.00
Additional Hours (per hour, per operative) £150.00 £155.00 £0.00 £155.00
Replacement of Lost/Damaged Equipment
Per Cone £25.00 £26.00 £0.00 £26.00
Per Notice Board £250.00 £260.00 £0.00 £260.00
Notes:
1.   All 3 Perth City Zones (including Rodney Pavilion and Bells Sports Centre) and Rural Towns allow first 15 minutes of free parking.
2.   All On and Off Street Charges Apply 8am To 6pm Monday To Saturday.
3.   On-Street Parking charges exclude VAT (outwith scope).
4.   Off-Street Parking charges include VAT (standard rate 20%).
5.   Bay Suspensions - discounted rates may be applied for extended periods for large events etc. See charging for Alternative Use of Car Parking Spaces above.
6.   Parking Dispensations - the Council must be satisfied that parking in contravention is necessary before approval will be granted.
7.   If charging for cones/notices to non-Council customer, standard rate VAT must be added to the charge.
8.   Surety Fee (DVLA delegated powers) - refundable if commitment to tax and correctly register the vehicle is complied with within 15 days.
By Arrangement By Arrangement
Discount by Arrangement Discount by Arrangement
No Charge No Charge
No Charge No Charge
Page 101 of 162

Page 102

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
RESIDENTIAL DEVELOPMENT
1) Construction of buildings, structures or erections for use as residential accommodation
(other than development within categories 2-6):-
a) Where development does not exceed 10 dwellings:
Fee per dwelling £691.00 £0.00 £691.00 £691.00 £0.00 £691.00
b) Where development is fewer than 50 dwellings:
Fee per dwelling for first 10 dwellings £691.00 £0.00 £691.00 £691.00 £0.00 £691.00
Fee for each dwelling thereafter £519.00 £0.00 £519.00 £519.00 £0.00 £519.00
c) Where development is 50 of more dwellings:
Fee for first 10 dwellings £6,910.00 £0.00 £6,910.00 £6,910.00 £0.00 £6,910.00
Fee per dwelling for dwellings 11-49 £519.00 £0.00 £519.00 £519.00 £0.00 £519.00
Fee per dwelling for 50th dwelling and above £288.00 £0.00 £288.00 £288.00 £0.00 £288.00
(Subject to a maximum of £172,856) (Subject to a maximum of £172,856)
EXISTING DWELLINGS
2) Carrying out of operations which will result in enlargement, improvement or
other alteration of an existing dwelling:-
a) Where application relates to 1 dwelling £346.00 £0.00 £346.00 £346.00 £0.00 £346.00
b) Where application relates to 2 or more dwellings £692.00 £0.00 £692.00 £692.00 £0.00 £692.00
3a) Carrying out of operations including erection of a building within the curtilage of an
existing dwelling, for purposes ancillary to the enjoyment of the dwelling as such:-
a) Where application relates to 1 dwelling £346.00 £0.00 £346.00 £346.00 £0.00 £346.00
b) Where application relates to 2 or more dwellings £692.00 £0.00 £692.00 £692.00 £0.00 £692.00
3b) Erection or construction of gates, fences, walls or other means of enclosure
along a boundary of the curtilage of an existing dwelling:-
a) Where application relates to 1 dwelling £346.00 £0.00 £346.00 £346.00 £0.00 £346.00
b) Where application relates to 2 or more dwellings £692.00 £0.00 £692.00 £692.00 £0.00 £692.00
NON-RESIDENTIAL BUILDINGS
4) Construction of buildings, structures or erections including extensions
(other than construction within categories 1, 5 and 6):-
a) Where no floor area is created, or the gross floor space does not exceed 50sq metres £346.00 £0.00 £346.00 £346.00 £0.00 £346.00
b) Where the gross floor space created exceeds 50sq metres, but does £691.00 £0.00 £691.00 £691.00 £0.00 £691.00
not exceed 100sq metres
c) Where the gross floor space created exceeds 100sq metres, but does £691.00 + £691.00 per £0.00 £691.00 + £691.00 per £691.00 + £691.00 per £0.00 £691.00 + £691.00 per
not exceed 4,000sq metres additional 100 sqm additional 100 sqm additional 100 sqm additional 100 sqm
d) Where the gross floor space created exceeds 4,000sq metres £27,640 + £346.00
per additional 100 sqm £0.00
£27,640 + £346.00
per additional 100 sqm
£27,640 + £346.00
per additional 100 sqm £0.00
£27,640 + £346.00
per additional 100 sqm
e) Where no buildings or floor space is to be created - fee per 0.1 hectare of site area £691.00 per 0.1 hectare £0.00 £691.00 per 0.1 hectare £691.00 per 0.1 hectare £0.00 £691.00 per 0.1 hectare
(Subject to a maximum of £172,856)
15:   PLANNING AND BUILDING STANDARDS CHARGES
This is not a comprehensive list of fees.  If in doubt please contact 
Economy, Development and Planning.
TABLE 1
Fees for applications for planning permission and for applications for matters
specified by condition on a planning permission in principle
Page 102 of 162

Page 103

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
AGRICULTURAL BUILDINGS
5) The erection, on land used for purposes of agriculture, of buildings to be used for
agriculture purposes (other than construction within category 6):-
£576.00 £0.00 £576.00 £576.00 £0.00 £576.00
b) Where the ground area to be covered by the development exceeds 500sq metres £576.00 + £576.00 per
additional 100 sqm £0.00
£576.00 + £576.00 per
additional 100 sqm
£576.00 + £576.00 per
additional 100 sqm £0.00
£576.00 + £576.00 per
additional 100 sqm
(Subject to a maximum of £28,809) (Subject to a maximum of £28,809)
GLASSHOUSES AND POLYTUNNELS
6) The erection of glasshouses or polytunnels to be used for agricultural purposes:-
Fee for each 100 square metres of ground area to be covered by the development £115.00 per 100 sqm £0.00 £115.00 per 100 sqm £115.00 per 100 sqm £0.00 £115.00 per 100 sqm
(Subject to a maximum of £5,762) (Subject to a maximum of £5,762)
ENERGY GENERATION - WIND TURBINES
7) The erection of wind turbines and the carrying out of other operations in connection with
the construction of the generating station, including the construction or installation of any
means of access to the generating station, pipes or other conduits, and overhead lines:-
a) Where the number of turbines does not exceed 3:
i) Where none of the turbines have a ground to hub height exceeding 15 metres £1,440.00 £0.00 £1,440.00 £1,440.00 £0.00 £1,440.00
ii) Where one or more of the turbines has a ground to hub height exceeding 15 metres, but
not exceeding 50 metres £2,880.00 £0.00 £2,880.00 £2,880.00 £0.00 £2,880.00
iii) Where one or more of the turbines has a ground to hub height exceeding 50 metres £5,760.00 £0.00 £5,760.00 £5,760.00 £0.00 £5,760.00
b) Where the number of turbines exceeds 3 - for each 0.1 hectare of site area £576.00 per 0.1 hectare £0.00 £576.00 per 0.1 hectare £576.00 per 0.1 hectare £0.00 £576.00 per 0.1 hectare
(Section awaiting clarification from Scottish Gov't relating to planning permission in principle) (Subject to a maximum of £172,856) (Subject to a maximum of £172,856)
ENERGY GENERATION - HYDRO ELECTRIC
8) The construction of a hydro-electric generating station and the carrying out of any other
operations in connection with the construction of the generating station, including the
construction or installation of any means of access to the generating station, pipes or other
conduits, and overhead lines:-
Fee for each 0.1 hectare of site area £576.00 per 0.1 hectare £0.00 £576.00 per 0.1 hectare £576.00 per 0.1 hectare £0.00 £576.00 per 0.1 hectare
(Subject to a maximum of £28,809) (Subject to a maximum of £28,809)
ENERGY GENERATION - SOLAR ELECTRIC
9) The construction of a solar-electric generating station and the carrying out of any other
operations in connection with the construction of the generating station, including the
construction or installation of any means of access to the generating station, pipes or other
conduits, and overhead lines:-
Fee for each 0.1 hectare of site area £576.00 per 0.1 hectare £0.00 £576.00 per 0.1 hectare £576.00 per 0.1 hectare £0.00 £576.00 per 0.1 hectare
(Subject to a maximum of £28,809) (Subject to a maximum of £28,809)
DRILLING FOR OIL / NATURAL GAS
10) The carrying out of any operations connected with the exploratory drilling for
oil or natural gas:-
a) Where the site area does not exceed 0.1 hectares £1,152.00 £0.00 £1,152.00 £1,152.00 £0.00 £1,152.00
b) Where the site area exceeds 0.1 hectares £1,152 + £576.00 per
additional 0.1 hectare £0.00
£1,152 + £576.00 per
additional 0.1 hectare
£1,152 + £576.00 per
additional 0.1 hectare £0.00
£1,152 + £576.00 per
additional 0.1 hectare
(Subject to a maximum of £172,856) (Subject to a maximum of £172,856)
a) Where the ground area to be covered by the development does not exceed 500sq metres
Page 103 of 162

Page 104

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
FISH AND SHELLFISH FARMING
11) The placing or assembly of equipment in any part of marine waters for the
purposes offish farming:-
For each 0.1 hectare of surface area of the marine waters to be used, plus £230.00 £0.00 £230.00 £230.00 £0.00 £230.00
For each 0.1 hectare of the sea bed to be used £86.00 £0.00 £86.00 £86.00 £0.00 £86.00
(Subject to a maximum of £28,809) (Subject to a maximum of £28,809)
£125.00 £0.00 £125.00 £125.00 £0.00 £125.00
(Subject to a maximum of £28,809) (Subject to a maximum of £28,809)
OTHER OPERATIONS
13) The erection, alteration or replacement of plant or machinery:-
*This would include plant or machinery for energy storage and heat network developments
a) Where the site area does not exceed 5 hectares £576.00 per 0.1 hectare £0.00 £576.00 per 0.1 hectare £576.00 per 0.1 hectare £0.00 £576.00 per 0.1 hectare
b) Where the site area exceeds 5 hectares £28,800 + £288.00 per
additional 0.1 hectare £0.00
£28,800 + £288.00 per
additional 0.1 hectare
£28,800 + £288.00 per
additional 0.1 hectare £0.00
£28,800 + £288.00 per
additional 0.1 hectare
(Subject to a maximum of £172,856) (Subject to a maximum of £172,856)
£576.00 £0.00 £576.00 £576.00 £0.00 £576.00
£1,152.00 £0.00 £1,152.00 £1,152.00 £0.00 £1,152.00
£1,152 + £576.00 per
additional 0.1 hectare £0.00
£1,000 + £500.00 per
additional 0.1 hectare
£1,152 + £576.00 per
additional 0.1 hectare £0.00
£1,152 + £576.00 per
additional 0.1 hectare
£86,976 + £288.00 per
additional 0.1 hectare £0.00
£86,976 + £288.00 per
additional 0.1 hectare
£86,976 + £288.00 per
additional 0.1 hectare £0.00
£86,976 + £288.00 per
additional 0.1 hectare
(Subject to a maximum of £172,856) (Subject to a maximum of £172,856)
£576.00 £0.00 £576.00 £576.00 £0.00 £576.00
(Subject to a maximum of £6,914) (Subject to a maximum of £6,914)
£1,152.00 £0.00 £1,152.00 £1,152.00 £0.00 £1,152.00
£1,152 + £576.00 per
additional 1 hectare £0.00
£1,152 + £576.00 per
additional 1 hectare
£1,152 + £576.00 per
additional 1 hectare £0.00
£1,152 + £576.00 per
additional 1 hectare
£9,792 + £288.00 per
additional 0.1 hectare £0.00
£9,792 + £288.00 per
additional 0.1 hectare
£9,792 + £288.00 per
additional 0.1 hectare £0.00
£9,792 + £288.00 per
additional 0.1 hectare
(Subject to a maximum of £172,856) (Subject to a maximum of £172,856)
17) The carrying out of any operations not coming within any of the above categories:-
a) Where the site area does not exceed 0.1 hectare
b) Where the site area exceeds 0.1 hectare but does not exceed 15 hectares
14) The construction of car parks, service roads and other means of access on land used for
the purposes of a single undertaking, where the development is required for a purpose
incidental to the existing use of the land:-
15) Operations for the winning and working of minerals (not including peat):-
a) Where the site area does not exceed 0.1 hectare
b) Where the site area exceeds 0.1 hectare but does not exceed 15 hectares
c) Where the site area exceeds 15 hectares
16) Operations for the extraction of peat:-
For each 0.1 hectare of site area
c) Where the site area exceeds 15 hectares
12) The placing or assembly of equipment in any part of marine waters for the purposes of
shellfish farming:-
For each 0.1 hectare of surface area of the marine waters to be used
Page 104 of 162

Page 105

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
USE OF LAND
18) The use of land for the disposal of refuse or waste materials or for the deposit
of material remaining after minerals have been extracted from land:-
a) Where the site area does not exceed 0.1 hectare £1,152.00 £0.00 £1,152.00 £1,152.00 £0.00 £1,152.00
b) Where the site area exceeds 0.1 hectare but does not exceed 15 hectares £1,152 + £576.00 per
additional 1 hectare £0.00
£1,152 + £576.00 per
additional 1 hectare
£1,152 + £576.00 per
additional 1 hectare £0.00
£1,152 + £576.00 per
additional 1 hectare
c) Where the site area exceeds 15 hectares £86,976 + £288.00 per
additional 0.1 hectare £0.00
£86,976 + £288.00 per
additional 0.1 hectare
£86,976 + £288.00 per
additional 0.1 hectare £0.00
£86,976 + £288.00 per
additional 0.1 hectare
(Subject to a maximum of £172,856) (Subject to a maximum of £172,856)
£1,152.00 £0.00 £1,152.00 £1,152.00 £0.00 £1,152.00
£1,152 + £576.00 per
additional 1 hectare £0.00
£1,152 + £576.00 per
additional 1 hectare
£1,152 + £576.00 per
additional 1 hectare £0.00
£1,152 + £576.00 per
additional 1 hectare
£86,976 + £288.00 per
additional 0.1 hectare £0.00
£86,976 + £288.00 per
additional 0.1 hectare
£86,976 + £288.00 per
additional 0.1 hectare £0.00
£86,976 + £288.00 per
additional 0.1 hectare
(Section awaiting clarification from Scottish Gov't) (Subject to a maximum of £172,856) (Subject to a maximum of £172,856)
CHANGE OF USE OF BUILDINGS OR LAND
20) The change of use of a building to use as one or more dwellings:-
a) Where the number of dwellings to be created does not exceed 10 dwellings:
Fee per dwelling £691.00 £0.00 £691.00 £691.00 £0.00 £691.00
b) Where the number of dwellings to be created is fewer than 50 dwellings:
Fee for first 10 dwellings £6,910.00 £0.00 £6,910.00 £6,910.00 £0.00 £6,910.00
Fee for each dwelling thereafter £519.00 £0.00 £519.00 £519.00 £0.00 £519.00
c) Where the number of dwellings to be created is 50 or more:
Fee for first 10 dwellings £6,910.00 £0.00 £6,910.00 £6,910.00 £0.00 £6,910.00
Fee for each dwelling in excess of 10 dwellings, up to 50 dwellings £519.00 £0.00 £519.00 £519.00 £0.00 £519.00
Fee for each dwelling in excess of 50 dwellings £288.00 £0.00 £288.00 £288.00 £0.00 £288.00
(Subject to a maximum of £172,856) (Subject to a maximum of £172,856)
£691.00 £0.00 £691.00 £691.00 £0.00 £691.00
£691.00 + £691.00 per
additional 100 sqm £0.00
£691.00 + £691.00 per
additional 100 sqm
£691.00 + £691.00 per
additional 100 sqm £0.00
£691.00 + £691.00 per
additional 100 sqm
£27,640 + £346.00
per additional 100 sqm £0.00
£27,640 + £346.00
per additional 100 sqm
£27,640 + £346.00
per additional 100 sqm £0.00
£27,640 + £346.00
per additional 100 sqm
(Subject to a maximum of £172,856) (Subject to a maximum of £172,856)
£576.00 per 0.1 hectare £0.00 £576.00 per 0.1 hectare £576.00 per 0.1 hectare £0.00 £576.00 per 0.1 hectare
(Subject to a maximum of £5,762) (Subject to a maximum of £5,762)
21) A material change in the use of a building (other than a change of use referred to in
category 20):-
a) Where the gross floor space does not exceed 100sq metres
b) Where the gross floor space exceeds 100sq meters, but does not exceed 4,000sq metres
c) Where the gross floor space exceeds 4,000sq metres
22) A material change in the use of land - fee per 0.1 hectare of site area (other than those
detailed below):-
a) A change of use within category 21, or
b) A change of use within categories 18 or 19, or
c) A change in the use of equipment place or assembled in marine waters for the purposes
of fish farming or shellfish farming
b) Where the site area exceeds 0.1 hectare but does not exceed 15 hectares
c) Where the site area exceeds 15 hectares
a) Where the site area does not exceed 0.1 hectare
19) The use of land for the storage of minerals in the open:-
Page 105 of 162

Page 106

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
RESIDENTIAL DEVELOPMENT - NEW DWELLINGS
1) Construction of buildings, structures or erections for use as residential accommodation:-
a) Where only 1 dwellinghouse is to be created £691.00 £0.00 £691.00 £691.00 £0.00 £691.00
b) Where more than 1 dwellinghouse is to be created and site area does £691.00 per 0.1 hectare £0.00 £691.00 per 0.1 hectare £691.00 per 0.1 hectare £0.00 £691.00 per 0.1 hectare
not exceed 2.5 hectares
c) Where more than 1 dwellinghouse is to be created and site area exceeds 2.5 hectares £17,275 + £346.00 per
additional 0.1 hectare £0.00
£17,275 + £346.00 per
additional 0.1 hectare
£17,275 + £346.00 per
additional 0.1 hectare £0.00
£17,275 + £346.00 per
additional 0.1 hectare
(Subject to a maximum of £86,428) (Subject to a maximum of £86,428)
NON-RESIDENTIAL BUILDINGS
2) Construction of buildings, structures or erections including extensions:-
b) Where the site is less than or equal to 2.5 hectares £691.00 per 0.1 hectare £0.00 £691.00 per 0.1 hectare £691.00 per 0.1 hectare £0.00 £691.00 per 0.1 hectare
c) Where the site area exceeds 2.5 hectares £17,275 + £346.00 per
additional 0.1 hectare £0.00
£17,275 + £346.00 per
additional 0.1 hectare
£17,275 + £346.00 per
additional 0.1 hectare £0.00
£17,275 + £346.00 per
additional 0.1 hectare
(Subject to a maximum of £86,428) (Subject to a maximum of £86,428)
CERTIFICATES OF LAWFULNESS OF EXISTING USE OR DEVELOPMENT
1) An application under section 150(1) (a) or (b) of the 1997 Act (or both as the case may be):-
The amount that would be payable in respect of an application for planning permission to
institute the use or carry out the operations specified in the application (or an application
to do both, as the case may be).
2) An application under section 150(1) (c) of the 1997 Act £346.00 £0.00 £346.00 £346.00 £0.00 £346.00
CERTIFICATES OF LAWFULNESS FOR PROPOSED USE OR DEVELOPMENT
3) An application under section 151(1) of the 1997 Act (apart from one within category 4):-
Half the amount that would be payable in respect of an application for planning
permission to institute the use or carry out the operations specified in the application
(or an application to do both, as the case may be).
£691.00 per
dwellinghouse £0.00
£691.00 per
dwellinghouse
£691.00 per
dwellinghouse £0.00
£691.00 per
dwellinghouse
(Subject to a maximum of £172,856) (Subject to a maximum of £172,856)
Refer to Table 1 for Fee
Refer to Table 1 for Fee - Half the Applicable Fee Refer to Table 1 for Fee - Half the Applicable Fee
4) An application under section 151(1) (a) where the use specified is use as one or more
separate dwellinghouses
Refer to Table 1 for Fee
TABLE 3
Fees for applications for a certificate of lawful use or development (Section 150) or
a certificate of proposed use or development (Section 151 of the 1997 Act).
TABLE 2
Fees for applications for planning permission in principle.
Page 106 of 162

Page 107

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
£200.00 £0.00 £200.00 £200.00 £0.00 £200.00
No Fee No Fee
£600.00 £0.00 £600.00 £600.00 £0.00 £600.00
£600.00 £0.00 £600.00 £600.00 £0.00 £600.00
£750.00 £0.00 £750.00 £750.00 £0.00 £750.00
£600.00 £0.00 £600.00 £600.00 £0.00 £600.00
£600.00 £0.00 £600.00 £600.00 £0.00 £600.00
No Fee No Fee
£750.00 £0.00 £750.00 £750.00 £0.00 £750.00
NON MATERIAL VARIATION
A request made to a planning authority to vary a planning permission under section 64 of
the Town and Country Planning (Scotland) Act 1997 (as amended) - see Note 9 below
Householder enquiries which would benefit from planning application fee exemption under
Reg 7 (means of access, etc for disabled persons)
Where an enquiry relates to a development which would benefit from planning application
fee reduction under Schedule 1, art 7 (community councils)
DISCHARGE OF CONDITIONS
Where an applicant seeks approval of information submitted in respect of a condition
attached to a planning permission, for the agreement of the planning authority - see Note 9 below
Householder enquiries which would benefit from planning application fee exemption under
Reg 7 (means of access, etc for disabled persons)
Where an enquiry relates to a development which would benefit from planning application
fee reduction under Schedule 1, art 7, (community councils)
Fee waived in full Fee waived in full
Fee reduced by half Fee reduced by half
9) An application made by virtue of sub-paragraph (23) of Class 67 of Part 20 (development by
electric communications code operators)
TABLE 5
Charges for discretionary services (regulation 4)
£200.00 for each request - no limit on number of requests £230.00 for each request - no limit on number of requests
Fees for a determination as to whether prior approval is required for development
under schedule 1 of the general permitted development order 1992, as amended.
1) An application made for determination as to whether the prior approval of the planning
authority is required in relation to development (other than one within categories 2 to 9)
2) An application made by virtue of paragraph (4A) of Class 18 of Part 6 (agricultural
buildings and operations)
3) An application made by virtue of paragraph (4) of Class 18 of Part 6 (agricultural
buildings and operations)
4) An application made by virtue of paragraph (5) of Class 18C of Part 6 (agricultural
buildings and operations)
5) An application made by virtue of paragraph (4) of Class 21A of Part 6A (fish farming)
6) An application made by virtue of paragraph (4) of Class 22A of Part 7 (forestry
buildings and operations)
7) An application made by virtue of paragraph (5) of Class 22B of Part 7 (forestry
buildings and operations)
8) An application made by virtue of paragraph (4) of Class 22 of Part 7 (forestry
buildings and operations)
Fee reduced by half Fee reduced by half
Fee waived in full Fee waived in full
£100.00 for each request - no limit on number of requests £115.00 for each request - no limit on number of requests
TABLE 4
Page 107 of 162

Page 108

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
COMPLIANCE WITH CONDITIONS
Where an applicant seeks confirmation that the terms set out in a condition attached
to a planning permission have been met: - see Note 9 below
Householder enquiries which would benefit from planning application fee exemption under
Reg 7 (means of access, etc for disabled persons)
Where an enquiry relates to a development which would benefit from planning application
fee reduction under Schedule 1, art 7, (community councils)
PRE-APPLICATION ENQUIRIES
A separate enquiry, and fee, is required for each development or each site.
Note - Pre-application enquires must be submitted via MyPKC on-line enquiry form.
Householder Enquiry £43.33 £8.67 £52.00 £45.83 £9.17 £55.00
Local Enquiries £250.00 £50.00 £300.00 £258.33 £51.67 £310.00
Major Enquiries £833.33 £166.67 £1,000.00 £866.67 £173.33 £1,040.00
Returned Applications - Administration Charge - see note 7 below £25.00 £0.00 £25.00 £26.00 £0.00 £26.00
PRE-VALIDATION SUBMISSION CHECKS
Where an application is checked before formal submission to identify any omissions.
Note - The scale of the development is as defined in the Hierarchy Regulations.
Householder Planning Applications £20.83 £4.17 £25.00 £21.67 £4.33 £26.00
Local Planning Applications £50.00 £10.00 £60.00 £54.17 £10.83 £65.00
Major Planning Applications £100.00 £20.00 £120.00 £104.17 £20.83 £125.00
Note - there is no charge is respect of submissions relating to listed building consent or
conservation area consent.
Where an enquiry relates to a householder development which would benefit from planning
application fee exemption under Reg 7 (means of access, etc for disabled persons)
Fee reduced by half
Where an enquiry relates to a development which would benefit from planning
application fee reduction under Schedule 1, art 7, (community councils) Fee reduced by half Fee reduced by half
Where an enquiry relates to a householder development which would benefit from planning
application fee exemption under Reg 7 (means of access, etc for disabled persons)
Fee waived in full Fee waived in full
Where an enquiry relates to a development which would benefit from planning
application fee reduction under Schedule 1, art 7, (community councils) Fee reduced by half
Fee reduced by half Fee reduced by half
Fee waived in full Fee waived in full
Fee waived in full Fee waived in full
£100.00 for each request - no limit on number of requests £115.00 for each request - no limit on number of requests
Page 108 of 162

Page 109

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
PREPARATION OF A PROCESSING AGREEMENT
MASTERPLAN CONSENT AREA SCHEMES
Note - "not for profit enterprise" and "social enterprise" have meanings in section
252(1F) of the Town and Country Planning (Scotland) Act 1997 (as amended)
APPLICATIONS BY COMMUNITY COUNCILS
APPLICATION IN CONSERVATION AREAS
a) Where the application relates solely to:-
i) The carrying out of operations for the alteration of a dwellinghouse (but not including
the extension of or the erection of a dwellinghouse); or
ii) The operations within the curtilage of a dwellinghouse (but not including the
extension of or the erection of a dwellinghouse)
b) The dwellinghouse is in a conservation area
c) The application relates solely to a development within one or more of the classes
specified in schedule 1 of the General Permitted Development Order; and
d) The only reason planning permission is not granted by article 3(1) of the General
Permitted Development Order is that the development would be in a conservation area.
Reduced and waived fees subject to agreement by Council Reduced and waived fees subject to agreement by Council
Applications by Community Councils Fee calculated in accordance with tables above, reduced by 50% Fee calculated in accordance with tables above, reduced by 50%
A planning authority may only charge a fee for the preparation of a processing agreement after
the publication of information setting out:-
a)  how the fee is to be calculated,
b)  under what circumstances the planning authority may waive or reduce the fee, and
c)  when any fee is to be paid.
(5B)  A fee for the preparation of a processing agreement:-
a)  is to be payable by the person entering into, or seeking to enter into, the processing
agreement with the planning authority, and
b)  may not exceed the cost to the planning authority of preparing the processing agreement.
Fee may be applied in certain circumstances - limited to cost recovery
The making or alteration to a masterplan consent area scheme
An application for approval, consent or agreement required by a condition specified in a
masterplan consent area scheme
A planning authority may:-
a)  require payment of a charge in respect of costs related to the making or alteration of a
masterplan consent area scheme from a person making an application for approval, consent or
agreement required by a condition specified in the masterplan consent area scheme,
b)  charge a fee in respect of an application for approval, consent or agreement required by a
condition specified in the masterplan consent area scheme.
Fee may be applied in certain circumstances - limited to cost recovery
TABLE 6
Waived or reduced fees for planning applications (regulations 5)
Where the application relates to development which, in the opinion of the planning authority,
has the primary purpose of contributing to a not-for-profit enterprise or a social enterprise, and
where the application relates to development which, in the opinion of the planning authority, is
likely to contribute to improving health of residents of the area to which the application relates.
Fee reduced by one quarter for planning applications, certificates
of lawful use or development, certificates of proposed use or development,
advertisement consents, applications made under section 41 and
determinations as to whether the planning authority's prior approval
is required.
Fee reduced by one quarter for planning applications, certificates
of lawful use or development, certificates of proposed use or development,
advertisement consents, applications made under section 41 and
determinations as to whether the planning authority's prior approval
is required.
Fee calculated in accordance with tables above, reduced by 25% Fee calculated in accordance with tables above, reduced by 25%
Page 109 of 162

Page 110

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
APPLICATIONS FOR THE PROVISION OF FACILITIES FOR SPORT OR RECREATION
£691.00 £0.00 £691.00 £691.00 £0.00 £691.00
a) Planning permission, or
b) The approval, consent, or agreement required by a condition imposed on a grant of
permission in principle, in respect of development of land lying in the areas of 2 or more
planning authorities.
CROSS BOUNDARY APPLICATIONS - ALLOCATION OF FEE
Where the applications are made for:-
The total fee payable in respect of all the applications is the lesser of:
a) One and a half times the amount of the fee which would have been payable
for an application in respect of the same development but lying in the area of a
single planning authority.
b) The sum of the amounts of the fees which would have been payable in
respect of all the applications.
The fee payable to a planning authority in respect of such an application is the
proportion of the total fee payable equal to the proportion of the total site area
of the development which falls within the area of that planning authority.
The total fee payable in respect of all the applications is the lesser of:
a) One and a half times the amount of the fee which would have been payable
for an application in respect of the same development but lying in the area of a
single planning authority.
b) The sum of the amounts of the fees which would have been payable in
respect of all the applications.
The fee payable to a planning authority in respect of such an application is the
proportion of the total fee payable equal to the proportion of the total site area
of the development which falls within the area of that planning authority.
Where an application is made by or for a club, society, trust or other organisation which is not
established or conducted for profit and whose objects or purposes, as the case may be, are the
provision of facilities for sport or recreation, and:
a) The application relates to:-
i) The making of material change in the use of land to use the land as a playing field;
or
ii) The carrying out of operations other than the erection of a building containing floor
space, for purposes ancillary to the use of the land as a playing field, and to no other    
development; and
b) That the planning authority is satisfied that the development is to be carried out on land which
is, or is intended to be used wholly or mainly for the carrying out of objects or purposes, as the
case may be, of the club, society, trust or organisation.
APPLICATIONS FOR THE APPROVAL, CONSENT OR AGREEMENT REQUIRED BY
A CONDITION IMPOSED ON A GRANT OF PLANNING PERMISSION IN PRINCIPLE
Where the application is for the approval, consent, or agreement required by a condition
imposed on a grant of permission in principle and:-
Planning permission in principle was granted before 1 April 2022, and the
application relates to development within categories 1, 4, 17 or 21 of table 1 the
fee payable is subject to a cumulative maximum of £125,000.  Once the
maximum fee has been reached, any and all subsequent applications pursuant
to that PPP will be subject to a fee of £576
Planning permission in principle was granted before 1 April 2022, and the
application relates to development within categories 1, 4, 17 or 21 of table 1
the fee payable is subject to a cumulative maximum of £125,000.  Once the
maximum fee has been reached, any and all subsequent applications pursuant
to that PPP will be subject to a fee of £576
Planning permission in principle was granted on or after 12 December 2024,
and the application relates to a development within categories 1, 4, 17 or 21 of
table 1 the fee payable is subject to the cumulative maximum of the relevant
fee category.   Once the maximum fee has bee reached, any and all
subsequent applications pursuant to that PPP will be subject to a fee of £576.
Planning permission in principle was granted on or after 12 December 2024,
and the application relates to a development within categories 1, 4, 17 or 21 of
table 1 the fee payable is subject to the cumulative maximum of the relevant
fee category.   Once the maximum fee has bee reached, any and all
subsequent applications pursuant to that PPP will be subject to a fee of £576.
Planning permission in principle was granted on or after 1 April 2022 and
before 12 December 2024, and the application relates to a development within
categories 1, 4, 17 or 21 of table 1 the fee payable is subject to a maximum of
£150,000.
Planning permission in principle was granted on or after 1 April 2022 and
before 12 December 2024, and the application relates to a development within
categories 1, 4, 17 or 21 of table 1 the fee payable is subject to a maximum of
£150,000.
Page 110 of 162

Page 111

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
APPLICATIONS MADE IN RETROSPECT
Where an application for planning permission is made after the whole development
being applied for has been carried out in full
ADVERTISEMENTS
All applications for express consent for the display of advertisements £346.00 £0.00 £346.00 £346.00 £0.00 £346.00
SECTION 42 APPLICATIONS
Applications for planning permission made under section 42 (applications to develop land £346.00 £0.00 £346.00 £346.00 £0.00 £346.00
without complying with previous conditions) of the 1997 Act
HIGH HEDGE APPLICATIONS
High Hedge Application Fee £350.00 £0.00 £350.00 £365.00 £0.00 £365.00
HAZARDOUS SUBSTANCES APPLICATIONS
Where an application is made under regulation 6 (applications for hazardous substances
consent) where the quantity specified in the application as the maximum quantity proposed £1,383.00 £0.00 £1,383.00 £1,383.00 £0.00 £1,383.00
to be present exceeds twice the controlled quantity
Where an application is made under:-
i) Regulation 6 (other than an application referred to in sub-paragraph above);
ii) Regulation 7 (applications for removal of conditions attached to hazardous
substances consent); or £691.00 £0.00 £691.00 £691.00 £0.00 £691.00
iii) Regulation 8 (application for continuation of hazardous substances consent where
there has been a change in the person in control of any part of the land).
See Town and Country Planning (Hazardous Substances) (Scotland) Regulations 2015
Fee calculated in accordance with tables above, plus one quarter
Where an application for planning permission is made when the development
being applied for has been started but not completed, including revised design
of a previously granted planning permission:-
Fee calculated in accordance with tables above, plus one quarter Fee calculated in accordance with tables above, plus one quarter
TABLE 7
Surcharges (applicable from 1 October 2022)
Fee calculated in accordance with tables above, plus one quarter
TABLE 8
Other Fees
Page 111 of 162

Page 112

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
ADMINISTRATION CHARGES
Electronic planning history search £83.33 £16.67 £100.00 £87.50 £17.50 £105.00
Copy of planning Decision Notice £33.33 £6.67 £40.00 £35.00 £7.00 £42.00
Copy of plans and documents Contact: developmentmanagement@pkc.gov.uk for price confirmation Contact: developmentmanagement@pkc.gov.uk for price confirmation
Note - Charge is per case file request This service is for electronic copies only. This service is for electronic copies only.
Paper/Email Applications - Administration Charge - see note 8 below £25.00 £0.00 £25.00 £26.00 £0.00 £26.00
Additional Fee for planning applications requiring advertisement in local press £50.92 £10.18 £61.10 £53.33 £10.67 £64.00
9) The statutory maximum charge allowable for these discretionary fees is set by Scottish
Government legislation and may be subject to annual change mid-year.   In line with our
financial principles, we may implement these, up to as much as the statutory maximum fee, at
the same implementation date as all statutory fee changes.
NOTES
1) All applications must be accompanied by the appropriate fee. As noted above, fees
will be checked at the point of validation.
2) The additional gross floor space created by the development must be clearly indicated in
square metres on the submitted plan. For the purposes of the fee regulations, gross floor
space includes all storeys, is measured externally including the thickness of internal and
external walls and can include areas under canopies.
3) The area of the site must be clearly stated in hectares on the application form and
the submitted plan.
4) There is no provision in the regulations for the refund of fees paid to Planning
Authorities in respect of applications which have been validated. Invalid or incomplete
applications will have fees returned if paid.
5) This is not a comprehensive list of fees.  If in doubt, please contact the Duty Planning Officer
on 01738 475300 or email developmentmanagement@pkc.gov.uk.  A copy of the Town and   
Country Planning (Fees for Applications) (Scotland) Regulations 2022 (as amended) is also     
available to view online.
6) Pre-application advice and pre-validation checks may be offered by external planning
consultants but may not adhere to advice and validation checks provided/accepted by Perth
and Kinross Council.
7) One opportunity will be given to address invalidity issues prior to returning any application,
where an application is returned, a handling and administration fee will be retained.
8) All applications are now required to be submitted online, all applications submitted either on
paper copy or via email will be subject to an additional handling and administration fee.
Page 112 of 162

Page 113

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
BUILDING STANDARDS (FEE LIST FOR BUILDING WARRANT AND ASS. PROCEDURES)
Value of Works (£)  -                                    
0 - 5,000 £200.00 £0.00 £200.00 £210.00 £0.00 £210.00
5,001 - 5,500 £219.00 £0.00 £219.00 £231.00 £0.00 £231.00
5,501 - 6,000 £238.00 £0.00 £238.00 £252.00 £0.00 £252.00
6,001 - 6,500 £257.00 £0.00 £257.00 £273.00 £0.00 £273.00
6,501 - 7,000 £276.00 £0.00 £276.00 £294.00 £0.00 £294.00
7,001 - 7,500 £295.00 £0.00 £295.00 £315.00 £0.00 £315.00
7,501 - 8,000 £314.00 £0.00 £314.00 £336.00 £0.00 £336.00
8,001 - 8,500 £333.00 £0.00 £333.00 £357.00 £0.00 £357.00
8,501 - 9,000 £352.00 £0.00 £352.00 £378.00 £0.00 £378.00
9,001 - 9,500 £371.00 £0.00 £371.00 £399.00 £0.00 £399.00
9,501 - 10,000 £390.00 £0.00 £390.00 £420.00 £0.00 £420.00
10,001 - 11,000 £412.00 £0.00 £412.00 £443.00 £0.00 £443.00
11,001 - 12,000 £434.00 £0.00 £434.00 £466.00 £0.00 £466.00
12,001 - 13,000 £456.00 £0.00 £456.00 £489.00 £0.00 £489.00
13,001 - 14,000 £478.00 £0.00 £478.00 £512.00 £0.00 £512.00
14,001 - 15,000 £500.00 £0.00 £500.00 £535.00 £0.00 £535.00
15,001 - 16,000 £522.00 £0.00 £522.00 £558.00 £0.00 £558.00
16,001 - 17,000 £544.00 £0.00 £544.00 £581.00 £0.00 £581.00
17,001 - 18,000 £566.00 £0.00 £566.00 £604.00 £0.00 £604.00
18,001 - 19,000 £588.00 £0.00 £588.00 £627.00 £0.00 £627.00
19,001 - 20,000 £610.00 £0.00 £610.00 £650.00 £0.00 £650.00
20,001 - 30,000 £681.00 £0.00 £681.00 £728.00 £0.00 £728.00
30,001 - 40,000 £752.00 £0.00 £752.00 £806.00 £0.00 £806.00
40,001 - 50,000 £823.00 £0.00 £823.00 £884.00 £0.00 £884.00
50,001 - 60,000 £894.00 £0.00 £894.00 £962.00 £0.00 £962.00
60,001 - 70,000 £965.00 £0.00 £965.00 £1,040.00 £0.00 £1,040.00
70,001 - 80,000 £1,036.00 £0.00 £1,036.00 £1,118.00 £0.00 £1,118.00
80,001 - 90,000 £1,107.00 £0.00 £1,107.00 £1,196.00 £0.00 £1,196.00
90,001 - 100,000 £1,178.00 £0.00 £1,178.00 £1,274.00 £0.00 £1,274.00
100,001 - 120,000 £1,295.00 £0.00 £1,295.00 £1,402.00 £0.00 £1,402.00
120,001  - 140,000 £1,412.00 £0.00 £1,412.00 £1,530.00 £0.00 £1,530.00
140,001 - 160,000 £1,529.00 £0.00 £1,529.00 £1,658.00 £0.00 £1,658.00
160,001 - 180,000 £1,646.00 £0.00 £1,646.00 £1,786.00 £0.00 £1,786.00
180,001 - 200,000 £1,763.00 £0.00 £1,763.00 £1,914.00 £0.00 £1,914.00
200,001 - 220,000 £1,880.00 £0.00 £1,880.00 £2,042.00 £0.00 £2,042.00
220,001 - 240,000 £1,997.00 £0.00 £1,997.00 £2,170.00 £0.00 £2,170.00
240,001 - 260,000 £2,114.00 £0.00 £2,114.00 £2,298.00 £0.00 £2,298.00
260,001 - 280,000 £2,231.00 £0.00 £2,231.00 £2,426.00 £0.00 £2,426.00
280,001 - 300,000 £2,348.00 £0.00 £2,348.00 £2,554.00 £0.00 £2,554.00
300,001 - 320,000 £2,465.00 £0.00 £2,465.00 £2,682.00 £0.00 £2,682.00
320,001 - 340,000 £2,582.00 £0.00 £2,582.00 £2,810.00 £0.00 £2,810.00
340,001 - 360,000 £2,699.00 £0.00 £2,699.00 £2,938.00 £0.00 £2,938.00
360,001 - 380,000 £2,817.00 £0.00 £2,817.00 £3,066.00 £0.00 £3,066.00
380,001 - 400,000 £2,933.00 £0.00 £2,933.00 £3,194.00 £0.00 £3,194.00
400,001 - 420,000 £3,050.00 £0.00 £3,050.00 £3,322.00 £0.00 £3,322.00
420,001 - 440,000 £3,167.00 £0.00 £3,167.00 £3,450.00 £0.00 £3,450.00
440,001 - 460,000 £3,284.00 £0.00 £3,284.00 £3,578.00 £0.00 £3,578.00
BUILDING STANDARDS
Page 113 of 162

Page 114

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
460,001 - 480,000 £3,401.00 £0.00 £3,401.00 £3,706.00 £0.00 £3,706.00
480,001 - 500,000 £3,518.00 £0.00 £3,518.00 £3,834.00 £0.00 £3,834.00
500,001 - 550,000 £3,720.00 £0.00 £3,720.00 £4,055.00 £0.00 £4,055.00
550,001 - 600,000 £3,922.00 £0.00 £3,922.00 £4,276.00 £0.00 £4,276.00
600,001 - 650,000 £4,124.00 £0.00 £4,124.00 £4,497.00 £0.00 £4,497.00
650,001 - 700,000 £4,326.00 £0.00 £4,326.00 £4,718.00 £0.00 £4,718.00
700,001 - 750,000 £4,528.00 £0.00 £4,528.00 £4,939.00 £0.00 £4,939.00
750,001 - 800,000 £4,730.00 £0.00 £4,730.00 £5,160.00 £0.00 £5,160.00
800,001 - 850,000 £4,932.00 £0.00 £4,932.00 £5,381.00 £0.00 £5,381.00
850,001 - 900,000 £5,134.00 £0.00 £5,134.00 £5,602.00 £0.00 £5,602.00
900,001 - 950,000 £5,336.00 £0.00 £5,336.00 £5,823.00 £0.00 £5,823.00
950,001 - 1,000,000 £5,538.00 £0.00 £5,538.00 £6,044.00 £0.00 £6,044.00
1,000,001 + And for every £100,000 or part thereof over £1 million add £287 And for every £100,000 or part thereof over £1 million add £315
Conversion only, without building work £200.00 £0.00 £200.00 £210.00 £0.00 £210.00
Application for demolition only £200.00 £0.00 £200.00 £210.00 £0.00 £210.00
Application for Amendment of Warrant (warrants received after 1 May 2005)
Where estimated costs are less than original or is an increase of no more than £5,000 £150.00 £0.00 £150.00 £150.00 £0.00 £150.00
Where the new estimated costs increase by more than £5,000 Fee is the amount for a building warrant of the same value as the increase Fee is the amount for a building warrant of the same value as the increase
e.g. if increase is £20,000; fee will be £610 e.g. if increase is £20,000; fee will be £650
For demolition or conversion only £150.00 £0.00 £150.00 £150.00 £0.00 £150.00
Application for extension of the duration of a Building Warrant (period 9 months) £150.00 £0.00 £150.00 £150.00 £0.00 £150.00
NB. Further extensions may be agreed at discretion of Verifier
Late Application (where work is already started):-
Late application for a building warrant for the construction of a building or the
provision of services, fittings and equipment in connection with a building.
Late application for demolition only £250.00 £0.00 £250.00 £300.00 £0.00 £300.00
Returned Applications - Administration Charge - see note 2 £25.00 £0.00 £25.00 £26.00 £0.00 £26.00
Completion Certificate Submitted where no warrant is obtained:-
For the construction of a building or the provision of services, fittings and equipment in
connection with a building (whether or not combined with an application for demolition)
For the demolition of a building only £400.00 £0.00 £400.00 £500.00 £0.00 £500.00
For conversion of a building only £400.00 £0.00 £400.00 £500.00 £0.00 £500.00
Fee is 200% of the fee in table of fees above Fee is 200% of the fee in table of fees above
Fee is the same as for a late application for building warrant of the same
value of works, that is 300% of the fee in the table of fees above
Fee is the same as for a late application for building warrant of the same
value of works, that is 300% of the fee in the table of fees above
Page 114 of 162

Page 115

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
Section 89 Applications:-
Raised Platform or Stage <30m square £150.00 £0.00 £150.00 £155.00 £0.00 £155.00
Raised Platform or Stage <30m square with overhead gantry £200.00 £0.00 £200.00 £210.00 £0.00 £210.00
Raised Platform or Stage >30m square £300.00 £0.00 £300.00 £315.00 £0.00 £315.00
Raised Seating £300.00 £0.00 £300.00 £315.00 £0.00 £315.00
Out of hours Inspections - additional fee £100.00 £0.00 £100.00 £105.00 £0.00 £105.00
Late Applications - additional fee (within 14 days of event) Application Fee + 50% Application Fee + 50%
Letter of Comfort where no Building Warrant obtained £375.00 £0.00 £375.00 £390.00 £0.00 £390.00
Letter of Comfort with Building Warrant but no Certificate of Completion £192.00 £0.00 £192.00 £200.00 £0.00 £200.00
Confirmation of Exemption £85.00 £0.00 £85.00 £88.00 £0.00 £88.00
Confirmation of Compliance £114.00 £0.00 £114.00 £120.00 £0.00 £120.00
Pre-warrant Discussion £300.00 £0.00 £300.00
ADMINISTRATION CHARGES
Electronic Copy of Planning Approval/Refusal Document £33.33 £6.67 £40.00 £35.00 £7.00 £42.00
Electronic Copy of Certificate of Completion £33.33 £6.67 £40.00 £35.00 £7.00 £42.00
Electronic Copy of Building Warrant/Refusal Decision Letter £33.33 £6.67 £40.00 £35.00 £7.00 £42.00
Paper Copy of Plans and Documents By arrangement with Communities Service By arrangement with Economy, Development and Planning
Note - Charge is per case file request
Local Development Plan £50.00 £0.00 £50.00 £50.00 £0.00 £50.00
Search Fee (Building Standards - 25 Years) £83.33 £16.67 £100.00 £87.50 £17.50 £105.00
Property Enquiries £83.33 £16.67 £100.00 £87.50 £17.50 £105.00
NOTES
1) Section 89 Application - Fees may be waived for charitable events and PKC
applications, and fees will be reduced by one third (33%) for repeat applications.
2) Returned applications administration charge - will apply where applications have been
lodged and registered but found to be exempt from Building Warrant and returned, or
are withdrawn before assessment.
3) This is not a comprehensive list of fees and discounts, for more information contact
PKC Building Standards - BuildingStandards@pkc.gov.uk
Page 115 of 162

Page 116

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
16: STREET NAMING AND NUMBERING, ROAD CONSTRUCTION
CONSENTS AND VEHICULAR ACCESS
STREET NAMING AND PROPERTY NUMBERING/RENUMBERING
Naming a new street £255.00 £0.00 £255.00 £265.00 £0.00 £265.00
Numbering / Renumbering Properties
1 Property £80.00 £0.00 £80.00 £85.00 £0.00 £85.00
2-5 Properties £140.00 £0.00 £140.00 £145.00 £0.00 £145.00
6-10 Properties £170.00 £0.00 £170.00 £175.00 £0.00 £175.00
11-25 Properties £220.00 £0.00 £220.00 £230.00 £0.00 £230.00
26-50 Properties £355.00 £0.00 £355.00 £370.00 £0.00 £370.00
51-100 Properties £690.00 £0.00 £690.00 £720.00 £0.00 £720.00
101-150 Properties £1,015.00 £0.00 £1,015.00 £1,055.00 £0.00 £1,055.00
151-200 Properties £1,220.00 £0.00 £1,220.00 £1,270.00 £0.00 £1,270.00
201+ Properties £1,345 + £5 per plot £0.00 £1,345 + £5 per plot £1,400 + £5 per plot £0.00 £1,400 + £5 per plot
Numbering / Renumbering a New Development
Registering an existing property or renaming a property £80.00 £0.00 £80.00 £85.00 £0.00 £85.00
Additional Services
Confirmation of an existing address  - per address (solicitor or private enquires) £45.00 £0.00 £45.00 £47.00 £0.00 £47.00
Status of Roads - Confirmation on status of sections of road (e.g. solicitors or agents) * £45.00 £0.00 £45.00 £47.00 £0.00 £47.00
*Larger or more complex requests may incur additional charges
Road Construction Consent/Road Adoption - Charge Per Officer Hour £75.00 £0.00 £75.00 £78.00 £0.00 £78.00
Vehicular Access where Planning Permission is not required * £300.00 £0.00 £300.00 £346.00 £0.00 £346.00
*Fees are linked to Householder Planning Application Fee
ELECTRICAL VEHICLE CHARGING
AC Charging (7kW)
Charging Cost - Minimum Fee £1.00 £0.38/kWh £0.07/kWh £0.45/kWh £0.39/kWh £0.08/kWh £0.47/kWh
AC Charging (22-25kW)
Charging Cost - Minimum Fee £1.00 £0.38/kWh £0.07/kWh £0.45/kWh £0.39/kWh £0.08/kWh £0.47/kWh
Overstay Fee £8.33 after 4 hours £1.67 after 4 hours £10.00 after 4 hours £8.33 after 4 hours £1.67 after 4 hours £10.00 after 4 hours
Rapid Charging (43kW+)
Charging Cost - Minimum Fee £1.00 £0.42/kWh £0.08/kWh £0.50/kWh £0.46/kWh £0.09/kWh £0.55/kWh
Overstay Fee £8.33 after 1 hour £1.67 after 1 hour £10.00 after 1 hour £8.33 after 1 hour £1.67 after 1 hour £10.00 after 1 hour
17: ELECTRICAL VEHICLE CHARGING
Climate Change and Sustainability Committee approved the "Introductions of Charging for Electric Vehicles" (Report No 22/191) on 24 August 2022. The recommendation
approved was the Executive Director (Communities) keep tariff rates under review during the year, with delegation to amend the tariff to ensure that future costs continue to be
recovered, alongside an annual review to be undertaken as part of the budget process.
As listed above less the street naming fees As listed above less the street naming fees
Page 116 of 162

Page 117

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
BUS DEPARTURE CHARGES
Blairgowrie - Wellmeadow Bus Stance - Per Departure:-
Local bus service departures £0.05 £0.01 £0.06 £0.05 £0.01 £0.06
Perth Bus Station - Per Departure:-
Local bus service departures £1.60 £0.32 £1.92 £1.60 £0.32 £1.92
Express coach service departures £2.40 £0.48 £2.88 £2.50 £0.50 £3.00
Perth Broxden Park and Ride - Per Departure:-
Express coach service departures £2.40 £0.48 £2.88 £2.50 £0.50 £3.00
PRIVATE LANDLORDS CHARGES
Tenancy Management Services - Per Property Per Year
20: SCHOOL MEALS AND BREAKFAST CLUBS
Primary Pupils £2.25 £0.00 £2.25 £2.30 £0.00 £2.30
Secondary Pupils £2.60 £0.00 £2.60 £2.95 £0.00 £2.95
Adult Meals £4.17 £0.83 £5.00 £4.33 £0.87 £5.20
Breakfast Clubs £2.00 £0.00 £2.00 £2.00 £0.00 £2.00
The above prices are effective from 21 April 2025.
21: CHILDCARE STRATEGY SERVICES
KIDS CLUBS:
Term Time:
One Child £10.20 £0.00 £10.20 £10.85 £0.00 £10.85
Additional Child £9.70 £0.00 £9.70 £10.30 £0.00 £10.30
Holidays and In-Service Days:
Up to 5 Hours £19.95 £0.00 £19.95 £21.10 £0.00 £21.10
Up to 7 Hours £22.30 £0.00 £22.30 £23.55 £0.00 £23.55
7 Hours+ £24.70 £0.00 £24.70 £26.10 £0.00 £26.10
The above prices are effective from 1 July 2025.
EARLY LEARNING AND CHILDCARE
Per Hour £5.25 £0.00 £5.25 £5.25 £0.00 £5.25
Meal* £2.42 £0.00 £2.42 £2.42 £0.00 £2.42
Per 6 Hour Session Including Meal and Snack £33.92 £0.00 £33.92 £33.92 £0.00 £33.92
N.B. There will be no change to the Registration Fee for Kids Clubs at £13 for a single child and
£20 per Family.
*  Scottish Milk and Healthy snack grant funds 58p per day per Nursery pupil for snack and
milk.
18: PUBLIC TRANSPORT CHARGING
(Subject to a maximum charge of £500 + VAT per property per year)(Subject to a maximum charge of £500 + VAT per property per year)
19: HOUSING MANAGEMENT SERVICES CHARGING
7.5% of rent charged + VAT 7.5% of rent charged + VAT
Page 117 of 162

Page 118

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
22: SCHOOL / COMMUNITY CAMPUS / ASTRO PITCHES LETS
SCHOOL AND COMMUNITY CAMPUS:
Standard
Small (Class Size) - Rate Per Hour £10.00 £0.00 £10.00 £10.00 £0.00 £10.00
Medium (Primary Hall / Specialist*) - Rate Per Hour £15.00 £0.00 £15.00 £15.00 £0.00 £15.00
Large (Secondary Hall / Gym) - Rate Per Hour £20.00 £0.00 £20.00 £20.00 £0.00 £20.00
Standard Junior: (Under 18)
Small (Class Size) - Rate Per Hour £6.00 £0.00 £6.00 £6.00 £0.00 £6.00
Medium (Primary Hall / Specialist*) - Rate Per Hour £8.00 £0.00 £8.00 £8.00 £0.00 £8.00
Large (Secondary Hall / Gym) - Rate Per Hour £12.00 £0.00 £12.00 £12.00 £0.00 £12.00
Concession:
Small (Class Size) - Rate Per Hour £8.00 £0.00 £8.00 £8.00 £0.00 £8.00
Medium (Primary Hall / Specialist*) - Rate Per Hour £10.00 £0.00 £10.00 £10.00 £0.00 £10.00
Large (Secondary Hall / Gym) - Rate Per Hour £16.00 £0.00 £16.00 £16.00 £0.00 £16.00
Concession Junior: (Under 18)
Small (Class Size) - Rate Per Hour £5.00 £0.00 £5.00 £5.00 £0.00 £5.00
Medium (Primary Hall / Specialist*) - Rate Per Hour £6.00 £0.00 £6.00 £6.00 £0.00 £6.00
Large (Secondary Hall / Gym) - Rate Per Hour £10.00 £0.00 £10.00 £10.00 £0.00 £10.00
Community Campus Meeting Packages:
Bronze - Half Day (4 Hours) £5.15 £0.00 £5.15 £5.15 £0.00 £5.15
Silver - Half Day (4 Hours) £7.15 £0.00 £7.15 £7.15 £0.00 £7.15
Gold - Half Day (4 Hours) £10.25 £0.00 £10.25 £10.25 £0.00 £10.25
Bronze - Full Day (8 Hours) £8.20 £0.00 £8.20 £8.20 £0.00 £8.20
Silver - Full Day (8 Hours) £14.35 £0.00 £14.35 £14.35 £0.00 £14.35
Gold - Full Day (8 Hours) £18.45 £0.00 £18.45 £18.45 £0.00 £18.45
For performance bookings, or bookings where tickets are sold, a box office charge
of 20% of sales may be considered as an alternative to the above charges.
ASTRO TURF:
Standard
Junior - One Third Pitch (Per Hour) £25.00 £5.00 £30.00 £25.00 £5.00 £30.00
Junior - Two Third Pitch (Per Hour) £29.17 £5.83 £35.00 £29.17 £5.83 £35.00
Junior - Full Pitch (Per Hour) £41.67 £8.33 £50.00 £41.67 £8.33 £50.00
Adult - One Third Pitch (Per Hour) £29.17 £5.83 £35.00 £29.17 £5.83 £35.00
Adult - Two Third Pitch (Per Hour) £37.50 £7.50 £45.00 £37.50 £7.50 £45.00
Adult - Full Pitch (Per Hour) £50.00 £10.00 £60.00 £50.00 £10.00 £60.00
PERTH HIGH COMMUNITY SPORTS HUB:
Standard
Small (Meeting Room) - Rate Per Hour £10.00 £0.00 £10.00 £10.00 £0.00 £10.00
Large (Hall) - Rate Per Hour £20.00 £0.00 £20.00 £20.00 £0.00 £20.00
Page 118 of 162

Page 119

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
Standard Junior
Small (Meeting Room) - Rate Per Hour £6.00 £0.00 £6.00 £6.00 £0.00 £6.00
Large (Hall) - Rate Per Hour £12.00 £0.00 £12.00 £12.00 £0.00 £12.00
Concession:
Small (Meeting Room / Outdoor Usage) - Rate Per Hour £8.00 £0.00 £8.00 £8.00 £0.00 £8.00
Large (Hall) - Rate Per Hour £16.00 £0.00 £16.00 £16.00 £0.00 £16.00
Concession Junior: (Under 18)
Small (Meeting Room / Outdoor Usage) - Rate Per Hour £5.00 £0.00 £5.00 £5.00 £0.00 £5.00
Large (Hall) - Rate Per Hour £10.00 £0.00 £10.00 £10.00 £0.00 £10.00
GEORGE DUNCAN ATHLETICS ARENA
Pay and Play - Junior £1.10 £0.00 £1.10 £1.10 £0.00 £1.10
Pay and Play - Adult £2.30 £0.00 £2.30 £2.30 £0.00 £2.30
Exempt:
All Council Services
Parent Councils / Elections
Kids Club (Non Profit Making)
User Type:
Commercial = Individuals or Commercial Groups/Organisations
who are profit making - Price on Request
Standard = All groups that do not fall under the Concession criteria, groups where
instructor retains income.
Concession = Non profit community benefit groups such as Adult Education Associations,
MP/MSP/MEP, Religious Activities, Community Planning Partners, Local Voluntary and
Charitable Organisations. Youth groups where instructor/club leader does not retain income.
Junior = Under 18 Activities.
Community Campuses:
Blairgowrie, Breadalbane, Glenearn, Loch Leven, North Inch, Strathearn
The above prices are effective from 1 August 2025.
23: INSTRUMENTAL MUSIC TUITION - CENTRAL GROUPS
Central Groups £0.00 £0.00 £0.00 £0.00 £0.00 £0.00
24: CONSULTANCY AND STAFF DEVELOPMENT
Charges for Authority Staff £673.00 £0.00 £673.00 £673.00 £0.00 £673.00
*All Specialist rooms will have restricted access and require initial contact with the
Campus Business Manager to confirm bookings.*Please note that the above charges do not apply to Community Campus sports
facilities managed by Live Active Leisure
Page 119 of 162

Page 120

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
25: WELLBANK HOUSE - RENT
Rent (Weekly) £64.52 £0.00 £64.52 £64.52 £0.00 £64.52
Eligible Rent (Weekly) £179.85 £0.00 £179.85 £179.85 £0.00 £179.85
Ineligible Amenity Charge (Weekly) £18.27 £0.00 £18.27 £18.27 £0.00 £18.27
Total Rent Charge (Weekly) £262.64 £0.00 £262.64 £262.64 £0.00 £262.64
26. CARE AND SUPPORT SERVICES
CARE AND SUPPORT SERVICES
Local Authority Residential Care (Per Week) £1,045.71 £1,087.54
OCCUPATIONAL THERAPY EQUIPMENT (MEANS TESTED)
OT Maintenance - Stair Lift / Step Lift / Platform Lift / Stair Climber (Annual Charge) £159.00 £165.36
OT Maintenance - Through Floor Lift (Annual Charge) £279.00 £290.16
OT Maintenance - Overhead Tracking Hoist (Annual Charge) £159.00 £165.36
OT Maintenance - Closomat (Annual Charge) £55.00 £57.20
CONTRIBUTION POLICY CHARGEABLE SERVICES (MEANS TESTED)
Community Alarm / Telecare (Weekly Charge) £4.94 £5.14
New Rannoch Day Care (Daily Rate) £62.21 £64.70
Day opportunities Older People (Daily Rate) £31.40 £32.66
Gleneagles Day Opportunities (Daily Rate) £46.38 £48.24
Kinnoull and Blairgowrie Day Opportunities (Daily Rate) £40.70 £42.33
External Transport (Per Journey) £19.87 £20.67
STAFF MEALS (PER MEAL)
Breakfast £1.74 £1.81
Lunch £3.48 £3.62
Tea/Supper £1.40 £1.46
Snack £0.95 £0.99
27: DESIGN WORKS
Designer - Charge per Hour £50.00 £10.00 £60.00 £50.00 £10.00 £60.00
Design Assistant - Charge per Hour £35.00 £7.00 £42.00 £35.00 £7.00 £42.00
Benchmarking was undertaken through Creative Exchange which is a group for all Scottish
Local Authority Graphic Design Teams in 2013 and these charges reflect the rates
applied at this time.
Page 120 of 162

Page 121

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
28: PERTH AND KINROSS LICENSING BOARD
FEES UNDER THE LICENSING (SCOTLAND) ACT 2005
PREMISES LICENCE APPLICATION
Category 1 £200 £0 £200 £200 £0 £200
Category 2 £800 £0 £800 £800 £0 £800
Category 3 £1,100 £0 £1,100 £1,100 £0 £1,100
Category 4 £1,300 £0 £1,300 £1,300 £0 £1,300
Category 5 £1,700 £0 £1,700 £1,700 £0 £1,700
Category 6 £2,000 £0 £2,000 £2,000 £0 £2,000
PREMISES LICENCE ANNUAL FEE
Category 1 £180 £0 £180 £180 £0 £180
Category 2 £220 £0 £220 £220 £0 £220
Category 3 £280 £0 £280 £280 £0 £280
Category 4 £500 £0 £500 £500 £0 £500
Category 5 £700 £0 £700 £700 £0 £700
Category 6 £900 £0 £900 £900 £0 £900
PROVISIONAL PREMISES LICENCE APPLICATION
(All categories) £200 £0 £200 £200 £0 £200
CONFIRMATION OF A PROVISIONAL PREMISES LICENCE
Category 1 £0 £0 £0 £0 £0 £0
Category 2 £600 £0 £600 £600 £0 £600
Category 3 £900 £0 £900 £900 £0 £900
Category 4 £1,100 £0 £1,100 £1,100 £0 £1,100
Category 5 £1,500 £0 £1,500 £1,500 £0 £1,500
Category 6 £1,800 £0 £1,800 £1,800 £0 £1,800
APPLICATION FOR TRANSFER UNDER SECTION 33
On its own £50 £0 £50 £50 £0 £50
Including an application for minor variation under section 35(1) £60 £0 £60 £60 £0 £60
Including an application for variation (which is
not a minor variation) under section 35(1)
Category 1 £75 £0 £75 £75 £0 £75
Category 2 £225 £0 £225 £225 £0 £225
Category 3 £300 £0 £300 £300 £0 £300
Category 4 £350 £0 £350 £350 £0 £350
Category 5 £450 £0 £450 £450 £0 £450
Category 6 £525 £0 £525 £525 £0 £525
Page 121 of 162

Page 122

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
APPLICATION FOR TRANSFER UNDER SECTION 34
On its own £50 £0 £50 £50 £0 £50
Including an application for minor variation under section 35(1) £60 £0 £60 £60 £0 £60
Including an application for variation (which is
not a minor variation) under section 35(1)
Category 1 £75 £0 £75 £75 £0 £75
Category 2 £225 £0 £225 £225 £0 £225
Category 3 £300 £0 £300 £300 £0 £300
Category 4 £350 £0 £350 £350 £0 £350
Category 5 £450 £0 £450 £450 £0 £450
Category 6 £525 £0 £525 £525 £0 £525
APPLICATION TO VARY UNDER SECTION 29
Minor variation £20 £0 £20 £20 £0 £20
Variation under section 31(1) on its own or with a minor variation £31 £0 £31 £31 £0 £31
Other variations:
Category 1 £50 £0 £50 £50 £0 £50
Category 2 £200 £0 £200 £200 £0 £200
Category 3 £275 £0 £275 £275 £0 £275
Category 4 £325 £0 £325 £325 £0 £325
Category 5 £425 £0 £425 £425 £0 £425
Category 6 £500 £0 £500 £500 £0 £500
FEES UNDER THE LICENSING (SCOTLAND) ACT 2005
Application For Temporary Premises Licence £150 £0 £150 £150 £0 £150
Personal Licence £50 £0 £50 £50 £0 £50
Issuing Replacement Personal Licence £10 £0 £10 £10 £0 £10
Occasional Licence £10 £0 £10 £10 £0 £10
Extended Hours Application £10 £0 £10 £10 £0 £10
Certified Copy Premises Licence £10 £0 £10 £10 £0 £10
All fees under the Licensing (Scotland) Act 2005 have been placed at the statutory
maximum with exception of Applications for Transfer under section 33 and 34,
Page 122 of 162

Page 123

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
LICENCE FEES
Taxi/Private Hire Car Driver’s Licence (New):
1 Year £149 £0 £149 £149 £0 £149
3 Years £207 £0 £207 £207 £0 £207
Taxi/Private Hire Car Driver’s Licence (Renewal):
1 Year £122 £0 £122 £122 £0 £122
3 Years £180 £0 £180 £180 £0 £180
Taxi Operator’s Licence:
WAV £74 £0 £74 £74 £0 £74
ULH £144 £0 £144 £144 £0 £144
Car £297 £0 £297 £297 £0 £297
Private Hire Operator’s Licence:
WAV £63 £0 £63 £63 £0 £63
ULH £122 £0 £122 £122 £0 £122
Car £250 £0 £250 £250 £0 £250
Taxi Booking Office:
1 Year £207 £0 £207 £207 £0 £207
3 Years £276 £0 £276 £276 £0 £276
Vehicle Substitution:
Private Hire £60.00 £0 £60.00 £60.00 £0 £60.00
Taxi £40.00 £0 £40.00 £40.00 £0 £40.00
Meter Test Only £37.50 £0 £37.50 £37.50 £0 £37.50
Change of Vehicle Registration £48 £0 £48 £48 £0 £48
Taxi Plate and Mounting:
Plate brackets front and back £30 £0 £30 £30 £0 £30
Plate (each) £15 £0 £15 £15 £0 £15
Advertisement £74 £0 £74 £74 £0 £74
Replacement Badge £10 £0 £10 £10 £0 £10
Replacement door stickers (each) £10 £0 £10 £10 £0 £10
Internal complaint badge and wallet £10 £0 £10 £10 £0 £10
Window Cleaner:
1 Year £116 £0 £116 £116 £0 £116
3 Years £175 £0 £175 £175 £0 £175
29: AMENDED FEES UNDER CIVIC GOVERNMENT (SCOTLAND) ACT 1982
Page 123 of 162

Page 124

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
Street Trader:
1 Year £175 £0 £175 £175 £0 £175
3 Years £250 £0 £250 £250 £0 £250
Street Trader (Variation) - 1 Year £111 £0 £111 £111 £0 £111
Second Hand Motor Dealer:
1 Year £217 £0 £217 £217 £0 £217
3 Years £323 £0 £323 £323 £0 £323
Second Hand Dealer:
1 Year £217 £0 £217 £217 £0 £217
3 Years £323 £0 £323 £323 £0 £323
Stamp Fairs - 1 Year £43 £0 £43 £43 £0 £43
Stall (Antiques Fair) - 1 Year £69 £0 £69 £69 £0 £69
Cabinet:
1 Year £69 £0 £69 £69 £0 £69
3 Years £164 £0 £164 £164 £0 £164
Market Operator:
1 Year £228 £0 £228 £228 £0 £228
3 Years £303 £0 £303 £303 £0 £303
1 Year £109 £0 £109 £109 £0 £109
3 Years £192 £0 £192 £192 £0 £192
Late Hours Catering:
1 Year £376 £0 £376 £376 £0 £376
3 Years £435 £0 £435 £435 £0 £435
Metal Dealer:
1 Year £228 £0 £228 £228 £0 £228
3 Years £303 £0 £303 £303 £0 £303
Itinerant Metal Dealer:
1 Year £133 £0 £133 £133 £0 £133
3 Years £202 £0 £202 £202 £0 £202
Indoor Sports Entertainment:
1 Year £207 £0 £207 £207 £0 £207
3 Years £281 £0 £281 £281 £0 £281
Sex Shop Licence £1,300 £0 £1,300 £1,300 £0 £1,300
Sexual Entertainment Licence £1,596 £0 £1,596 £1,596 £0 £1,596
already in place for the same premises:
Page 124 of 162

Page 125

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
Skin Piercing and Tattooing Licence:
1 Year £270 £0 £270 £270 £0 £270
3 Years £334 £0 £334 £334 £0 £334
Small Lotteries:
Licence £40 £0 £40 £40 £0 £40
Renewal £20 £0 £20 £20 £0 £20
Material Change Civic £74 £0 £74 £74 £0 £74
Knife Dealers:
1 Year £270 £0 £270 £270 £0 £270
3 Years £323 £0 £323 £323 £0 £323
Knife Dealers (Fair) £69 £0 £69 £69 £0 £69
PUBLIC ENTERTAINMENT
Community/Village Halls:
1 Year £197 £0 £197 £197 £0 £197
3 Years £260 £0 £260 £260 £0 £260
Capacity < 200:
1 Year £197 £0 £197 £197 £0 £197
3 Years £260 £0 £260 £260 £0 £260
Capacity 201 – 1500:
1 Year £313 £0 £313 £313 £0 £313
3 Years £382 £0 £382 £382 £0 £382
Capacity 1501 – 5000:
1 Year £758 £0 £758 £758 £0 £758
3 Years £869 £0 £869 £869 £0 £869
Capacity 5001 – 20000:
1 Year £1,629 £0 £1,629 £1,629 £0 £1,629
3 Years £2,169 £0 £2,169 £2,169 £0 £2,169
Capacity >20000:
1 Year £3,251 £0 £3,251 £3,251 £0 £3,251
3 Years £4,334 £0 £4,334 £4,334 £0 £4,334
Funfair:
1 Year £323 £0 £323 £323 £0 £323
3 Years £520 £0 £520 £520 £0 £520
Fun Fair/Inflatables with less than 5 kids rides at Community Event £68 £0 £68 £68 £0 £68
Page 125 of 162

Page 126

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
HOUSES IN MULTIPLE OCCUPATION - Housing (Scotland) Act 2006
Occupancy 3-5 £785 £0 £785 £785 £0 £785
Occupancy 6-10 £864 £0 £864 £864 £0 £864
Occupancy 11-20 £950 £0 £950 £950 £0 £950
Occupancy 21-30 £1,045 £0 £1,045 £1,045 £0 £1,045
Occupancy 31-40 £1,149 £0 £1,149 £1,149 £0 £1,149
Occupancy 41-50 £1,298 £0 £1,298 £1,298 £0 £1,298
Occupancy 51-75 £1,427 £0 £1,427 £1,427 £0 £1,427
Occupancy 76-100 £1,569 £0 £1,569 £1,569 £0 £1,569
Occupancy 101+ £1,725 £0 £1,725 £1,725 £0 £1,725
Additional Inspection Fee £80 £0 £80 £80 £0 £80
Variation to HMO £71 £0 £71 £71 £0 £71
SHORT-TERM LET LICENCE FEES
3-Year Licence New/Renewal
Secondary Letting Licence:
Occupancy 1-2 Guests £350 £0 £350 £350 £0 £350
Occupancy 3-6 Guests £530 £0 £530 £530 £0 £530
Occupancy 7-10 Guests £900 £0 £900 £900 £0 £900
Occupancy 11+ Guests £1,600 £0 £1,600 £1,600 £0 £1,600
Home Letting Licence:
Occupancy 1-2 Guests £175 £0 £175 £175 £0 £175
Occupancy 3-6 Guests £265 £0 £265 £265 £0 £265
Occupancy 7-10 Guests £450 £0 £450 £450 £0 £450
Occupancy 11+ Guests £800 £0 £800 £800 £0 £800
Home Sharing Licence:
Occupancy 1-2 Guests £175 £0 £175 £175 £0 £175
Occupancy 3-6 Guests £265 £0 £265 £265 £0 £265
Occupancy 7-10 Guests £450 £0 £450 £450 £0 £450
Occupancy 11+ Guests £800 £0 £800 £800 £0 £800
Home Letting and Home Sharing Licence:
Occupancy 1-2 Guests £175 £0 £175 £175 £0 £175
Occupancy 3-6 Guests £265 £0 £265 £265 £0 £265
Occupancy 7-10 Guests £450 £0 £450 £450 £0 £450
Occupancy 11+ Guests £800 £0 £800 £800 £0 £800
The report “Review of Licence Fees” approved all amended fees
under Civic Government (Scotland) Act 1982 (Report No. 12/173 refers).
Page 126 of 162

Page 127

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
Temporary Licence (Maximum Period of 6 Weeks)
Secondary Letting Licence
Occupancy 1-2 Guests £175 £0 £175 £175 £0 £175
Occupancy 3-6 Guests £270 £0 £270 £270 £0 £270
Occupancy 7-10 Guests £450 £0 £450 £450 £0 £450
Occupancy 11+ Guests £800 £0 £800 £800 £0 £800
Home Letting Licence:
Occupancy 1-2 Guests £90 £0 £90 £90 £0 £90
Occupancy 3-6 Guests £135 £0 £135 £135 £0 £135
Occupancy 7-10 Guests £225 £0 £225 £225 £0 £225
Occupancy 11+ Guests £400 £0 £400 £400 £0 £400
Home Sharing Licence:
Occupancy 1-2 Guests £90 £0 £90 £90 £0 £90
Occupancy 3-6 Guests £135 £0 £135 £135 £0 £135
Occupancy 7-10 Guests £225 £0 £225 £225 £0 £225
Occupancy 11+ Guests £400 £0 £400 £400 £0 £400
Home Letting and Home Sharing Licence:
Occupancy 1-2 Guests £90 £0 £90 £90 £0 £90
Occupancy 3-6 Guests £135 £0 £135 £135 £0 £135
Occupancy 7-10 Guests £225 £0 £225 £225 £0 £225
Occupancy 11+ Guests £400 £0 £400 £400 £0 £400
Temporary Exemption (Max. Period of 6 Weeks in any 12 Month Period)
Secondary Letting Licence
Occupancy 1-2 Guests £90 £0 £90 £90 £0 £90
Occupancy 3-6 Guests £135 £0 £135 £135 £0 £135
Occupancy 7-10 Guests £225 £0 £225 £225 £0 £225
Occupancy 11+ Guests £400 £0 £400 £400 £0 £400
Home Letting Licence:
Occupancy 1-2 Guests £45 £0 £45 £45 £0 £45
Occupancy 3-6 Guests £70 £0 £70 £70 £0 £70
Occupancy 7-10 Guests £115 £0 £115 £115 £0 £115
Occupancy 11+ Guests £200 £0 £200 £200 £0 £200
Home Sharing Licence:
Occupancy 1-2 Guests £45 £0 £45 £45 £0 £45
Occupancy 3-6 Guests £70 £0 £70 £70 £0 £70
Occupancy 7-10 Guests £115 £0 £115 £115 £0 £115
Occupancy 11+ Guests £200 £0 £200 £200 £0 £200
Home Letting and Home Sharing Licence:
Occupancy 1-2 Guests £45 £0 £45 £45 £0 £45
Occupancy 3-6 Guests £70 £0 £70 £70 £0 £70
Occupancy 7-10 Guests £115 £0 £115 £115 £0 £115
Occupancy 11+ Guests £200 £0 £200 £200 £0 £200
Page 127 of 162

Page 128

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
Material Change of Circumstances - Premises
Secondary Letting Licence
Occupancy 1-2 Guests £175 £0 £175 £175 £0 £175
Occupancy 3-6 Guests £270 £0 £270 £270 £0 £270
Occupancy 7-10 Guests £450 £0 £450 £450 £0 £450
Occupancy 11+ Guests £800 £0 £800 £800 £0 £800
Home Letting Licence:
Occupancy 1-2 Guests £90 £0 £90 £90 £0 £90
Occupancy 3-6 Guests £135 £0 £135 £135 £0 £135
Occupancy 7-10 Guests £225 £0 £225 £225 £0 £225
Occupancy 11+ Guests £400 £0 £400 £400 £0 £400
Home Sharing Licence:
Occupancy 1-2 Guests £90 £0 £90 £90 £0 £90
Occupancy 3-6 Guests £135 £0 £135 £135 £0 £135
Occupancy 7-10 Guests £225 £0 £225 £225 £0 £225
Occupancy 11+ Guests £400 £0 £400 £400 £0 £400
Home Letting and Home Sharing Licence:
Occupancy 1-2 Guests £90 £0 £90 £90 £0 £90
Occupancy 3-6 Guests £135 £0 £135 £135 £0 £135
Occupancy 7-10 Guests £225 £0 £225 £225 £0 £225
Occupancy 11+ Guests £400 £0 £400 £400 £0 £400
Variation of Licence £75 £0 £75 £75 £0 £75
Material Change of Circumstance - Licence Holder £75 £0 £75 £75 £0 £75
Duplicate Licences £20 £0 £20 £20 £0 £20
Certified True Copy of any Entry on the Public Register £20 £0 £20 £20 £0 £20
The fee to register as a private landlord with a single local authority is £75 + £17 per property.
The fee to register as a private landlord with a two or more local authorities is £37.50 per local authority + £17 per property.
Late penalty fee is £149.
PROFESSIONAL FEES
Fees are placed at a level which reflects the fact that the Council wants to attract
business. The Council only recover fees where the transaction involves a third
party (e.g. lease/servitude) and it is reasonable to recover them from the third party.
PROPERTY SALES
Any fee is agreed with Estates which is then deducted off the
capital receipt.
SECTION 75
The Council charge £500 which is broadly in line with other Councils. This is notified
to the other party at the start of the transaction and recovered at the end of the
transaction before the planning consent is issued.
Page 128 of 162

Page 129

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
REGISTRATION FEES
Full or Abbreviated Extract:
Purchased within one month of registration £10 £0 £10 £10 £0 £10
Where the Registrar is given sight of a full or abbreviated extract £10 £0 £10 £10 £0 £10
Purchased more than one month after the date of registration £15 £0 £15 £15 £0 £15
Submission of marriage notice (per notice form) £45 £0 £45 £45 £0 £45
For solemnisation of civil marriage/ civil partnership £55 £0 £55 £55 £0 £55
£65 £0 £65 £70 £0 £70
£140 £0 £140 £145 £0 £145
Extra fee payable for weekday ceremonies (outwith normal office hours) £210 £0 £210 £220 £0 £220
Extra fee payable for weekend ceremonies £235 £0 £235 £245 £0 £245
Naming Ceremony £250 £0 £250 £260 £0 £260
Renewal of Vows £250 £0 £250 £260 £0 £260
Particular Search £5 £0 £5 £5 £0 £5
General Search £15 £0 £15 £15 £0 £15
Individual Citizenship Ceremony £80 £0 £80 £80 £0 £80
Should the Register General decide to increase the statutory charges during 2025/26 a further report will be presented to the Finance and Resources Committee.
31: HUMAN RESOURCES CHARGES
Trade Union Commission - Subject to requirements of the Trade Union Bill
Arrestment Income:
Legislation allows the right on all employers to deduct a £1.00
administration fee from employees with salary arrestments
Payroll Service charge - This is inflated by RPI annually
Insurance Personal Accident
Insurance Illness
Consultancy:
This is dependent on requirements and the level of the work involved
10% of total payment per insurer 10% of total payment per insurer
£100 per hour (Dependant on requirements) £100 per hour (Dependant on requirements)
£1.68 per item on payslip per employee £1.74 per item on payslip per employee
21.12% of total payment to insurer 21.12% of total payment to insurer
(during office hours)
2.5% of gross deduction 2.5% of gross deduction
£1 Per Employee £1 Per Employee
30: DEMOCRATIC SERVICES CHARGES
Lounge (during office hours)
Page 129 of 162

Page 130

Total Total
Charge Charge Charge Charge
24/25 VAT 24/25 (Inc VAT) 25/26 VAT 25/26 (Inc VAT)
Mainstream Rent
Bed and Breakfast
Dispersed Tenancies
Greyfriars Hostel:
Rent
Heat and Light
St Catherine's Square:
Rent
Sheltered Housing (PKC)
Retirement Complexes
Rechargeable Repairs
Inappropriate Emergencies
Planned Maintenance
Stair Lighting
Lock-up Rent:
Council Tenants
Non-Council Tenants
Garage Site
Heat and Lighting - Council Tenants:
Sheltered Housing
Market, Milne and Lickley Court
Multi-Tenure Blocks - Owner Occupiers:
Market, Milne and Lickley Court
Potterhill and Pomarium
Legal Expenses:
Single Tenant
Joint Tenant
Eviction fees/costs
Garden Maintenance
Garden Maintenance - Hedge Cutting
£200.00 - £300.00 per year £200.00 - £300.00 per year
£124.00 per year £453.96 per year
£46.80 per year
£300.00 - £400.00 per year £300.00 - £400.00 per year
£300.00 - £400.00 per year £300.00 - £400.00 per year
£10.23 per week £10.84 per week
£444.77 - £492.07 per year £526.63 - £650.57 per year
£1,339.07 - £1,339.27 per year £1,302.95 - £1,303.08 per year
£791.96 - £1,334.84 per year £633.88 - £1,117.48 per year
£791.44 per year £632.84 per year
SHELTERED HOUSING
£53.22 - £89.54 per week £56.41 - £94.91 per week
OTHER ACCOMMODATION SERVICES
Cost varies depending on the extent of the works Cost varies depending on the extent of the works
£253.24 per year £261.04 per year
£47.18 - £113.73 per week £50.01 - £120.55 per week
£11.90 per week £11.90 per week
Charge depends on establishment rate and family / room size Charge depends on establishment rate and family / room size
MAINSTREAM ACCOMMODATION
TEMPORARY HOMELESS ACCOMMODATION
£47.18 - £113.73 per week £50.01 - £120.55 per week
32: HOUSING RELATED CHARGES
£2.45 per week £2.60 per week
£12.27 per week £13.01 per week
£40.00 per call out £40.00 per call out
£29.12 per year £52.35 per year
Cost varies depending on the extent of the works Cost varies depending on the extent of the works
£53.22 - £71.38 per week £56.41 - £75.66 per week
£68.31 per week £72.41 per week
Page 130 of 162

Page 131

Appendix E
Summary of Council Cash Backed Reserves
• 31 March 2024
• Projected 31 March 2025 
The audited 2023/24 Annual Accounts, that were presented to the Audit and Risk
Committee on 2 December 2024 (Report No. 24/340 refers), provides an overview of
the Reserves position as at 31 March 2024 which is summarised in the table below.   
A projection of balances to be held 31 March 2025 is also shown. 
Summary of Council Cash Backed Reserves   
2024/25
(Projected) 
£’000 
2023/24
(Audited)
£’000
General Fund 61,403 83,794
Housing Revenue Account 900 2,260
Capital Fund 37,993 31,026
Insurance Fund 100 1,709
Capital Receipts Reserve 1,120 2,102
Capital Grants Unapplied 87     87 
101,603 120,978   
The above summary excludes the 
• Revaluation Reserve
• Capital Adjustments Account
• Financial Instruments Adjustment Account
• Pensions Reserve
• Employee Statutory Adjustment Account 
These Reserves reflect proper accounting practice, but are not resource-backed and
are, therefore, of limited relevance in determining the Council’s Reserves and budget
strategies.
4
Page 131 of 162

Page 132

Page 132 of 162

Page 133

Appendix F
£'000 £'000
Balance on General Fund at 1 April 2024 83,794
Budgeted Contributions to/(from) Balances (Approved February
2024) (13,819)
Approved Contributions to/(from) Balances since February 2024 (13,191)
Revenue Monitoring - Report 3
Service 1,111
Corporate 44
1,155
Year End  Adjustments:
Devolved School Management: Projected Under spend 200
Revenue Grants - PEF Funding 100
Developer Contributions: Commuted Sums Net Income 187
Salix (23)
Service concession 3,000
3,464
Projected Balance on General Fund at 31 March 2025 61,403
Projected General Fund Balance at 31 March 2025 (excl HRA)
4
Page 133 of 162

Page 134

Page 134 of 162

Page 135

Appendix G
Earmarked General Fund Balances
31-Mar-25 31-Mar-24
(Projected) (Actual)
£m £m
General Fund Balance at 31 March (Per Appendix F) 61.403 83.794
Less Earmarked Amounts
Service Concession Scheme (13.262) (17.262)
Revenue Grants (9.505) (17.337)
Developer Contributions (6.642) (6.455)
Transformation and Workforce Management (4.855) (7.606)
Affordable Housing (4.201) (5.609)
Car Parking (0.992) (1.532)
Anti-Poverty Measures (0.985) (1.860)
Non-Recurring Pressures c/f from 2024/25 (0.671) 0.000
Non-Recurring Pressures c/f from 2023/24 (0.379) (1.635)
Culture (0.296) (0.857)
School Estate (0.262) (2.164)
Devolved School Management Balances (0.200) (0.501)
Works Maintenance (0.200) (0.200)
Property Maintenance (0.112) (0.262)
Local Government Elections (0.106) (0.053)
School Counsellors (0.102) (0.329)
Climate Change (0.095) (0.205)
Salix Fund (0.079) (0.102)
Community Investment Fund (0.067) (0.087)
Child Abuse (0.050) 0.000
Local Action Partnerships (0.046) (0.046)
Financial Assistance (0.040) (0.020)
Modern Apprentices / Graduate Trainees (0.027) (0.367)
Services for Children, Young People and Families 0.000 (0.281)
Community Resilience 0.000 (0.175)
Ventilation measures 0.000 (0.076)
Perth Leisure Vision 0.000 (0.062)
Total Earmarked Reserves (43.174) (65.083)
Updated Uncommitted Balance 18.229 18.711
4
Page 135 of 162

Page 136

Page 136 of 162

Page 137

Appendix H 
Summary of Earmarked Reserves at 31 March 2025
Service Concession Scheme - £13.262 million
These resources are earmarked to be phased over a number of years to contribute
to the funding of the Revenue Budget.
Revenue Grants - £9.505 million
These grants are being carried forward in Reserves in accordance with proper
accounting practice as the grant conditions have been met but the relevant
expenditure has not yet been fully incurred.  It is possible that further grants will be
received in advance of the financial year end, which will augment the projected
earmarked Reserve.
Developer Contributions: Commuted Sums & Infrastructure and Affordable
Housing - £6.642 million
The Environment, Infrastructure and Economic Development Committee approved
supplementary guidance on 20 September 2023 for developer contributions. 
Developer Contributions are held in the Council’s earmarked Reserves until they are
applied to relevant schemes.  It is projected that approximately £983,000 of
unapplied resources in relation to affordable housing will be held by the Council at 31
March 2025. 
Additionally, it is proposed to earmark accumulated balances of £3.439 million for
the provision of education infrastructure and £855,000 for transport infrastructure. 
Contributions are also provided by developers towards the cost of maintaining areas
of ground. These contributions are used to fund relevant expenditure over a ten-year
period.   
It is projected that approximately £1.365 million of unapplied resources for tree
planting, play areas, community allotments and sports grounds will be held by the
Council at 31 March 2025. 
Transformation and Workforce Management - £4.855 million  
The Council has resources earmarked to enable the Transformation & Change
Strategy and workforce management in future years.
Affordable Housing (Resources accrued from reduced Council Tax Discounts)
- £4.201 million
It is anticipated that by the end of the current financial year, there will be a balance of
approximately £4.201 million in earmarked Reserves which has been generated
because of the Council’s policy of varying the level of Council Tax charged for long
4
Page 137 of 162

Page 138

term empty properties and second homes.  There are projected commitments
against this reserve of £200,000 in 2025/26.
Car Parking - £992,000
The Car Parking balance at 31 March 2025 is projected to be reduced from the start
of the year due to the level of investment. This surplus is restricted in its application
under the Road Traffic Regulation Act 1984.
Anti-Poverty Measures - £985,000
The Council approved the creation of a COVID-19 Reserve on 27 January 2021
(Report 21/8 refers) to assist with addressing the ongoing impact of Covid-19 in
future years.  This has now been redirected towards Anti-Poverty measures.  
Non-Recurring Revenue Budget Proposals - £671,000 from 2024/25
The 2025/26 Provisional Revenue Budget includes non-recurring expenditure
proposals of £671,000 which are funded by the Council’s earmarked reserves and
have been approved during the year at the Finance & Resources Committee.
Non-Recurring Revenue Budget Proposals - £379,000 from 2023/24
The 2025/26 Provisional Revenue Budget includes non-recurring expenditure
proposals of £379,000 which are funded by the Council’s earmarked reserves and
have been approved during 2023/24 at the Finance & Resources Committee.
Culture - £296,000
There is £296,000 remaining from previous earmarked resources for future cultural
initiatives across the Council.
School Estate - £262,000
These resources include amounts previously approved by the Council for the primary
and secondary school estate including maintenance works and resources for new
schools.
Devolved School Management (DSM) - £200,000
The earmarked amount shown above is an estimate of the accumulated sum
available to be carried forward at 31 March 2025 under the approved scheme for
managing these budgets.  The purposes for which the earmarked amount can be
used and the procedures for its management and control are detailed in the
Council’s approved DSM scheme 
Works Maintenance - £200,000
It is proposed that the Council continues to earmark the balance of £200,000 for
future works maintenance which remains from the £1.25 million approved as part of
the 2018/19 – 2020/21 Revenue Budget. 
Page 138 of 162

Page 139

Property Maintenance - £112,000
Revenue Budget Report 2021/22 No 3 to the Strategic Policy & Resources
Committee on 24 November 2021 approved the earmarking of resources of
£250,000 in respect of property maintenance to be utilised in future years.  This was
increased by a further £55,000 in 2021/22.  There is £112,000 remaining from these
resources.
Local Government Elections - £106,000
These resources are earmarked in reserves as a contribution to local elections.
School Counsellors - £102,000
Revenue Budget 2020/21 Update No 2 to the Strategic Policy & Resources
Committee on 25 November 2020 (Report No. 20/225 refers) approved the
earmarking of resources received from the Scottish Government in respect of
counselling in schools which were not anticipated to be spent in 2020/21 due to
school closure during the lockdown period.  These resources will be applied in
2025/26 following the awarding of a three-year contract.
Climate Change - £95,000
Resources are earmarked for climate change activities across the Council.
Salix Fund - £79,000
Salix Finance Ltd is a Government owned non-departmental public body which
provides interest free loan funding for energy efficiency works. The loan is re-paid to
the fund over a number of years and re-invested in future energy efficiency works. 
It is projected that the balance on the Fund at 31 March 2025 will be approximately
£79,000 and this amount is shown as being earmarked within General Fund
Reserves.
Community Investment Fund - £67,000
It is proposed that the Council continues to earmark the remaining balance of
£67,000 of the Community Investment.
Child abuse - £50,000
These resources are earmarked for any future additional costs incurred in preparing
for public hearings in respect of investigations into Child Abuse arising from
residential care claims.
Local Action Partnerships - £46,000
The amount shown is earmarked for Local Action Partnerships and is the balance of
resources which were approved in 2017/18 Revenue Monitoring Report 3 by the
Strategic Policy & Resources Committee (Report No.18/41 refers).  These resources
are approved for payment to groups via application to one of the seven local action
partnerships.
Page 139 of 162

Page 140

Financial Assistance - £40,000
There is a recurring annual contribution from reserves to fund any future Mods and
other events across Perth and Kinross.
Modern Apprentices / Graduate Trainees - £27,000
The projected balance remaining at 31 March 2025 is £27,000 which remains from
previous funding for modern apprentices and graduate trainees.
Page 140 of 162

Page 141

Appendix I
£'000 £'000
Projected General Fund Balance at 1 April 2025 61,403
Financial Year 2025/26
Additions to Balances during year 3,306
Use of Balances (9,418)
(6,112)
Projected General Fund Balance at 31 March 2026 55,291
Financial Year 2026/27
Additions to Balances during year 4,362
Use of Balances (3,944)
418
Projected General Fund Balance at 31 March 2027 55,709
Financial Year 2027/28
Additions to Balances during year 3,787
Use of Balances (2,680)
1,107
Projected General Fund Balance at 31 March 2028 56,816
Summary of the Projected Use of General Fund Revenue Balances 
2025/26 ,2026/27 and 2027/28
The following table only takes account of the use of Reserves where there are
known commitments over the next three years.  Where the timing of expenditure is
unknown budgets will be updated as appropriate.
4
Page 141 of 162

Page 142

Page 142 of 162

Page 143

PERTH AND KINROSS COUNCIL
Our vision is a Perth and Kinross where everyone can live life
well, free from poverty and inequality
___________________________________________________________________
Committee or Board: Perth and Kinross Council
Date of Meeting: 26 February 2025
Report Title: Strategic Investment and Composite Capital Budget
Update 2025/26 to 2030/31
Report Number: 25/37
Report Author: John Jennings, Senior Accountant
Gregor Walker, Asset Management Officer
Organisational Lead: Scott Walker, Chief Finance Officer
___________________________________________________________________
1. Purpose
1.1 The purpose of this Report is to outline the proposed budget for the
Composite Capital Programme for the six years from 2025/26 to 2030/31.
1.2 Sections
1. Purpose
2. Recommendations
3. Background
4. Asset Management Plans and Strategy
5. Capital Budget 2025/26 to 2029/30
6. Capital Budget 2030/31
7. Funding Strategy
8. Impact Value Assessment
9. Appendices
2. Recommendations
2.1 It is recommended that the Council:
(i) Approves the adjustments to the existing Capital Budget from 2025/26 to
2029/30 set out in Section 5.
(ii) Approves the estimated new capital resources available for the year
2030/31, as detailed at Section 6 of this report and included in
Appendix I.
5
Page 143 of 162

Page 144

(iii) Approve the proposed Composite Capital Budget for 2030/31 outlined in
Section 6
(iv) Approve the six-year Composite Capital Budget for 2025/26 to 2030/31
as shown at Appendix II of this report.
3. Background
Historic Information/Context
3.1 At its meeting on 28 February 2024, the Council approved the six-year
Composite Capital Budget for 2024/25 to 2029/30 (Report 24/64 refers). The
Finance and Resources Committee subsequently approved updates to this
programme throughout the year. In order to maintain a six-year budget,
proposals for 2030/31 are now required to be developed. The estimated
resources and the process for this year are outlined below.
3.2 This report outlines the estimated resources available for the Composite
Capital Budget and details the proposed Composite Capital Programme for
the years 2025/26 to 2030/31, thus maintaining a six-year programme.
4. Asset Management Plans and Strategy
4.1 In January 2024, Council approved the Corporate Asset Management
Framework (Report 24/18 refers). This included an overarching Corporate
Asset Management Policy and Strategy which set out the corporate approach
to the management of assets to deliver the Council’s strategic priorities.
4.2 This is supported by 5 stream asset management plans covering:
 Community Greenspace
 Fleet
 ICT
 Property
 Roads
4.3 The asset plans describe how individual asset streams adhere to the
corporate policy and provide an assessment of the 30-year investment
requirement for each asset stream based upon life cycle planning for the
existing asset base and existing levels of service. The asset plans are
intended to be iterative documents and will be updated on an annual basis to
incorporate additional investment and disinvestment decisions.
4.4 Asset management strategy and planning for the Council’s social housing
stock is undertaken through the separate Strategic Housing Investment
Programme (SHIP) which is developed in consultation with Council tenants
and funded through the Housing Revenue Account.
4.5 The critical importance for service delivery of the Council’s assets and
infrastructure is reflected within the 5 stream asset management plans.
Page 144 of 162

Page 145

The asset plans also highlight the long-term financial challenge presented
through investing in and operating these assets.
4.6 Detailed information on each asset stream was set out within the Corporate
Asset Management Framework (Report 24/18 refers).  This position has been
updated and the total investment required, based on existing service levels,
not updated for inflation, is now £3.324 billion which is set out in Table 1
below:
Table 1: Corporate Asset Management Overview and Life Cycle Planning
Investment Projections (30 Year Plan) (2025/26 -2053/54)
Asset Stream Current Asset
Base
Lifecycle Planning Investment
Projections (30 Year Plan)
Community
Greenspace
1,649 greenspace
sites
£0.123 billion
Fleet 2,535 items of fleet
and mechanical
equipment
£0.102 billion
Information and
Communication
Technology (ICT)
23,025 items of
hardware and all
corporate software
£0.220 billion
Property 970 sites within the
property estate
£2.202 billion
Roads 1,548 miles of
carriageway and
related
infrastructure
£0.677 billion
Total £3.324 billion
4.7 The Corporate Asset Management Plan and Strategy underlines the
importance of the Council committing a significant element of its available
Capital resources on a recurring basis towards investment in our existing
assets and infrastructure.
4.8 It is anticipated that the Strategic Investment Advisory Group (SIAG) will take
part in a workshop late this year. The purpose of this session will be to
provide an overview of how the Council can take steps to address the gap
between the investment requirements and funding. This may involve both
investment and disinvestment in assets. Furthermore, the SIAG will consider
future capital investment / expenditure plans. Any future proposals for future
capital investment will be presented to future meetings of the Finance and
Resource Committee or the Council for final decisions.
Page 145 of 162

Page 146

5. Capital Budget 2025/26 To 2029/30
Adjustments to Resources
5.1 Following receipt of the latest funding information from the Scottish
Government, there are several adjustments affecting the resources in the
current approved programme.
5.2 With the Scone Flood Protection Scheme no longer being included in the
Scottish Government priority list, no further grant funding is available for the
scheme. Consequently, the Capital Grant settlement for 2025/26 includes the
removal of grant for the Scone scheme, with only historic expenditure
receiving grant (at 80%), together with some rephasing of grant for the other
schemes.
5.3 It is therefore proposed to remove the Scone Flood Protection Scheme from
the approved programme, with a reduction of budgeted expenditure of
£767,000 and grant income of £576,000 in the years 2024/25 to 2028/29,
resulting in a net saving of £191,000. This amount has therefore been added
to the total available resources for the Programme outlined at Section 6
below.
5.4 Surface drainage works are currently being investigated at Scone in
conjunction with the Flood Protection works, and it is also anticipated that a
revised scheme will be submitted for consideration for inclusion in a future
Capital Budget once it has been further developed.
5.5 The Scottish Government Capital Grant settlement for 2025/26 also includes
£665,000 of ring-fenced grant for Active Travel. This is an increase of £65,000
from the amount previously assumed for 2025/26, and it is therefore proposed
to increase the Active Travel programme by this amount.
6.6 However, the General Capital Grant for 2025/26 is £255,000 lower than
previously assumed, and this has also been incorporated into the overall
available resources outlined at Section 6.
6.7 A summary of the adjustments to the previously assumed Resources in the
current programme are shown in Table 2 below:
Table 2 – Reduction in Assumed Resources 2025/26 to 2029/30
£’000
Reduction in Grant - Scone Flood Protection Scheme (576)
Reduction in General Capital Grant (255)
Reduction in Budgeted Expenditure – Scone Flood Protection
Scheme
767
Reduction in Available Resources 2025/26 to 2029/30 (64)
Page 146 of 162

Page 147

Adjustments to Approved Budgets
6.8 The Finance and Resources Committee approved the last Capital Monitoring
report for the Composite programme at its meeting on 5 February 2025
(Report 25/25 refers), covering the period up to 2029/30. It is proposed to
make one further adjustment to the current approved Programme, before the
remaining available resources as outlined at Section 6 below are allocated.
6.9 Technology Enabled Telecare was added to the Programme in 2022/23 in
order to allow for the replacement of the old analogue Community Alarm
system and equipment which were no longer being supported, with digital
equipment. This was included as an annual programme, with the refreshment
of digital equipment required in later years. However, it was not included
within the Capital Budget report in February 2024, therefore there is currently
no allocation for 2029/30. It is therefore proposed to include £1 million in
2029/30 to ensure the programme can continue across all years.
7. Capital Budget 2030/31
Resources
7.1 It is currently estimated that the Council will have total new capital resources
of £40.750 million available for the Composite Programme in 2030/31 which
is summarised in Table 3 below.
Table 3 - Estimated New Resources 2030/31
2030/31
£m
Long Term Borrowing 26.000
General Capital Grant 12.150
Ring Fenced Grant – Active Travel 0.600
Developer Contributions 2.000
Property Disposals 0.000
TOTAL RESOURCES 40.750
7.2 Under the Local Government in Scotland Act 2003 and the Prudential Code,
the Council is required to determine how much it can afford to allocate each
year for capital expenditure. This includes determining how much it can afford
to borrow, based on its Loan Charge Budgets and forecasts of interest rates.
Based on the approved Loans Fund and Capital Fund Strategy within the
Medium-Term Financial Plan, including the top-slicing of 1.25% of Council Tax
to increase the Loan Charges budget, it has been determined that £26 million
of new borrowing is available to support the 2030/31 Capital Programme.
7.3 The level of General Capital Grant for 2030/31 has been estimated at £13.75
million. After allowing for the annual amount which is applied in the Revenue
Budget (£1.6 million), the balance of £12.15 million is available for the
Capital Programme, and included in Table 2. These amounts are based on
recent allocations, with no inflationary uplift applied.
Page 147 of 162

Page 148

It has also been assumed that the ring-fenced Capital Grant for Active Travel
will continue in the years to 2030/31 at an assumed level of £600,000 each
year. However, it should be noted that the Scottish Government has not
announced allocations for Capital Grants beyond 2025/26, therefore there
remains uncertainty over the actual level to be received in each subsequent
year to 2030/31.
7.4 Developer Contributions of £2 million have also been assumed in 2030/31.
This is slightly lower than estimates included each year in the current Capital
Programme, however the amounts receivable are uncertain and variable, and
are dependent on the rate of local house building. There are no Third Party
and Revenue Contributions assumed at this stage. This reflects the
expenditure proposals outlined in Section 6 relating to annual programmes
only. Contributions may therefore be identified once specific work
programmes are developed over time.
7.5 There are also no receipts assumed at this stage from property disposals,
with fewer surplus properties being identified in recent years. This will also be
kept under review over the coming years.
7.6 In addition, Third Party Developer Contributions of £1 million and receipts of
£650,000 have been included in the programme for 2030/31 in relation to the
Perth Eco-Innovation Park at Perth West. These are part of the original
funding strategy for this project, with receipts forecast for several years
beyond the end of current budgeted 6-year programme. Therefore, these
receipts are ring-fenced for this project and are not available for distribution
and have not been included in the New Resources in Table 2 above, however
they have been included in the total Resources at Appendix I.
Expenditure
7.7 Given the constrained resources available, it is proposed that the available
funds are allocated only to ongoing annual rolling programmes in 2030/31 in
line with recent annual allocations, with no further adjustments for new
projects. The proposed annual allocations are set out in Table 4 as follows:
Table 4 - Proposed Allocation of Resources
2030/31
£m
Structural Maintenance 9.500
Bridges and Parapet Refurbishments 1.500
Footways 0.400
Road Safety 0.450
Traffic Signals 0.120
Street Lighting 0.600
Play Area Improvements 0.500
Community Greenspace 0.250
Cemetery Extensions 0.200
ICT Infrastructure 5.000
Supporting Digital and Data Analytics 1.650
Page 148 of 162

Page 149

Schools Audio Visual Equipment 0.200
Property (including School Estate) 11.000
Health and Social Care – OT Equipment 0.300
Health and Social Care Telecare 1.000
IT Licences (HSC and ex-Communities) 0.170
TOTAL 32.840
7.8 The Scottish Government ring-fenced Capital Grant for Active Travel projects
(previously Cycling Walking and Safer Streets) has also been included in
2030/31. Any differences in the actual amount of grant allocated in each year
will be adjusted once the allocations are announced.
7.9 A summary of the overall proposed allocations from the available resources
are shown in Table 5 below:
Table 5 – Summary of the Allocation of new Resources
£ million
Annual Allocation for Programmes 2030/31 (Section 6.7) 32.840
Active Travel – Ring Fenced Expenditure 2030/31 (Section 6.8) 0.600
Increase in Technology Enabled Telecare 2029/30 (Section 5.9) 1.000
Reduction in Resources 2025/26 to 2029/30 (Section 5.7) 0.064
Unallocated Resources 2030/31 (see Section 6.10 below) 6.246
TOTAL NEW RESOURCES 2030/31 (Section 6.1) 40.750
7.10 The Finance and Resources Committee on 5 February 2025 (Report 25/25
refers) approved the principle of retaining any budget savings as Unallocated
Resources, pending the identification and consideration of future priorities. It
is proposed that this principle is extended, with the balance of available
resources of £6.246 million added to the Unallocated Resources in 2030/31.
7.11 In addition to the programmes above, it is proposed to include several projects
in 2030/31 funded by “Prudential Borrowing”, and the proposed projects are
as follows:
 Fleet Vehicle Replacement Programme - £3.5 million for Vehicle
Purchases, less £350,000 of estimated vehicle disposals.
 Wheeled Bin Replacement Programme - £255,000 for Domestic wheeled
Bins and £25,000 for Commercial Wheeled Bins.
 Recycling Skips and Containers - £75,000
 Litter Bins - £55,000
 Energy Conservation and Carbon Reduction - £150,000 for each year
2028/29, 2029/30 and 2030/31.
7.12 All the above projects are included in the proposed Composite Capital Budget
for 2025/26 to 2030/31 shown at Appendix II. This shows that the Council’s
proposed total gross investment on the Composite Capital Programme in the
six years to 2030/31 amounts to over £503.628 million.
Page 149 of 162

Page 150

8. Funding Strategy.
8.1 The funding of the Composite programme will be managed by the
continuation of the Capital Fund Strategy over the medium to long term. This
includes continuing the top-slicing of 1.25% of the Council Tax each year to
increase the Loan Charges Budget. Updated Loan Charge estimates will be
included in the proposed Prudential Indicators within the Annual Treasury
Strategy report to be considered by the Council on 5 March 2025, whilst
updated Loans Fund and Capital Fund estimates show that the proposed
capital plans in this report are affordable, prudent and sustainable.
9. Impact Value Assessment
Strategic Investment and Composite Capital Budget Update 2025/26 to
2030/31
10. Appendices
Appendix I   – Capital Resources 2025/26 to 2030/31
Appendix II  – Proposed Composite Capital Budget 2025/26 to 2030/31
Page 150 of 162

Page 151

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL BUDGET 2025/26 TO 2030/31
ESTIMATED RESOURCES
APPENDIX 1
Capital Capital Capital Capital Capital Capital Capital Total
Resources Resources Resources Resources Resources Resources Resources Capital
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 Resources
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed
Budget Budget Budget Budget Budget Budget Budget Budget
Capital Grants
General Capital Grant 26,927 9,515 22,389 12,750 12,750 12,750 12,750 82,904
Recycling Improvement Fund 98 0 0 0 0 0 0 0
Road Safety Initiaive Fund 383 0 0 0 0 0 0 0
Total Capital Grants 27,408 9,515 22,389 12,750 12,750 12,750 12,750 82,904
General Capital Receipts
General Fund - Capital Receipts 413 507 0 0 0 0 0 507
General Fund Ring Fenced Receipts 552 578 844 994 981 1,019 1,000 5,416
Total Capital Receipts 965 1,085 844 994 981 1,019 1,000 5,923
Commercial Property Capital Receipts
Capital Receipts b/f 2,102 (96,001) (118,585) (184,271) (171,459) (167,159) (161,887) (96,001)
Commercial Property Capital Receipts 713 430 0 1,088 0 0 0 1,518
Capital Receipts c/f 96,001 118,585 184,271 171,459 167,159 161,887 158,587 158,587
Total Commercial Capital Receipts Applied 98,816 23,014 65,686 (11,724) (4,300) (5,272) (3,300) 64,104
Contributions
Tay Cities Deal (69) 550 505 3,945 500 956 0 6,456
Third Party Contributions 1,485 0 2,000 3,000 1,000 1,000 1,000 8,000
Developer Contributions 3,707 2,367 2,600 2,600 2,500 2,500 2,000 14,567
Revenue Budget Contributions 84 124 124 124 0 0 0 372
Total Contributions 5,207 3,041 5,229 9,669 4,000 4,456 3,000 29,395
Capital Borrowing Requirement
Corporate Borrowing Requirement 23,444 70,878 35,448 71,029 47,723 31,145 26,586 282,809
Prudential Borrowing Requirement 8,423 20,474 3,724 3,540 3,500 3,575 3,680 38,493
Total Capital Borrowing Requirement 31,867 91,352 39,172 74,569 51,223 34,720 30,266 321,302
TOTAL CAPITAL RESOURCES/
GROSS BUDGET EXPENDITURE 164,263 128,007 133,320 86,258 64,654 47,673 43,716 503,628
5
Page 151 of 162

Page 152

Page 152 of 162

Page 153

PERTH & KINROSS COUNCIL APPENDIX II
COMPOSITE CAPITAL BUDGET 2025/26 to 2030/31
SUMMARY OF NET EXPENDITURE
Revised Approved Approved Approved Approved Approved Approved Approved
Budget Budget Budget Budget Budget Budget Budget Total
Budget
2025/26-
SERVICE 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2030/31
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
ENVIRONMENT & INFRASTRUCTURE 30,760 46,769 36,099 22,104 17,851 16,103 16,700 155,626
HOUSING & COMMUNITIES 1,829 4,009 1,493 1,558 1,500 1,500 950 11,010
ECONOMY, DEVELOPMENT & PLANNING 50,868 12,457 32,843 (5,862) (2,150) (2,636) (1,650) 33,002
PROPERTY SERVICES 68,812 55,876 52,803 48,867 35,150 22,650 11,150 226,496
CUSTOMER & DIGITAL SERVICES 8,347 5,995 5,219 10,222 8,502 5,911 6,950 42,799
HEALTH & SOCIAL CARE 1,062 1,649 1,390 1,306 1,320 1,170 1,370 8,205
UNALLOCATED CAPITAL RESOURCES 52 0 0 0 0 0 6,246 6,246
TOTAL NET BUDGET 161,730 126,755 129,847 78,195 62,173 44,698 41,716 483,384
5
Page 153 of 162

Page 154

PERTH & KINROSS COUNCIL APPENDIX II
COMPOSITE CAPITAL BUDGET 2025/26 to 2030/31
Revised Approved Approved Approved Approved Approved Approved Approved
Budget Budget Budget Budget Budget Budget Budget Total
ENVIRONMENT & INFRASTRUCTURE Budget
2025/26-
PROJECT/NATURE OF EXPENDITURE 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2030/31
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Traffic & Road Safety
Road Safety Initiatives (20mph zones etc.) 718 362 362 361 400 400 450 2,335
Scottish Government Grant (383) 0 0 0 0 0 0 0
Road Safety Initiatives - A94 Safety Improvements 84 0 0 0 0 0 0 0
Active Travel - Traffic & Road Safety Schemes 816 665 600 600 600 600 600 3,665
Third Party Contribution (77) 0 0 0 0 0 0 0
Additional Road Safety - Pedestrian Crossings 60 246 153 0 0 0 0 399
Schools Road Safety Measures 122 0 0 0 0 0 0 0
20mph Signage Programme - Schools 128 0 0 0 0 0 0 0
20mph Signage Programme 39 0 0 0 0 0 0 0
Car Parking Investment - Pitlochry 205 0 0 0 0 0 0 0
Revenue Contribution (55) 0 0 0 0 0 0 0
Asset Management - Roads & Lighting
Structural Maintenance 13,347 8,963 8,963 8,964 8,320 8,320 9,500 53,030
Third Party Contributions (262) 0 0 0 0 0 0 0
Traffic Signals - Renewals/Upgrading 173 100 100 100 100 100 120 620
Footways 622 368 368 368 341 341 400 2,186
Street Lighting 0 0 0 0 600 600 600 1,800
Investment in Local Footpaths 0 20 100 0 0 0 0 120
Road Safety Barriers 22 0 0 0 0 0 0 0
Asset Management - Bridges
Bridge Refurbishment Programme 1,283 2,723 2,520 3,201 2,000 2,000 1,500 13,944
Vehicular Bridge Parapets Programme - Assess & Upgrade 1 33 0 0 0 0 0 33
Old Perth Bridge - Strengthening 155 2,380 0 0 0 0 0 2,380
TOTAL CARRIED FORWARD 16,998 15,860 13,166 13,594 12,361 12,361 13,170 80,512
Page 154 of 162

Page 155

Revised Approved Approved Approved Approved Approved Approved Approved
Budget Budget Budget Budget Budget Budget Budget Total
ENVIRONMENT & INFRASTRUCTURE Budget
2025/26-
PROJECT/NATURE OF EXPENDITURE 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2030/31
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
TOTAL BROUGHT FORWARD 16,998 15,860 13,166 13,594 12,361 12,361 13,170 80,512
Perth Queens Bridge - Strengthening 59 154 2,143 0 0 0 0 2,297
Garry Viaduct 46 321 515 1,790 1,690 0 0 4,316
Culteuchar Culvert 13 0 0 0 0 0 0 0
Improvement Schemes
A977 Upgrades 5 173 0 0 0 0 0 173
Broich Road, Crieff - Road Realignement & Safety Measures 0 18 0 0 0 0 0 18
Rural Flood Mitigation Schemes
Perth Flood Protection Scheme - South Inch Culvert 259 0 0 0 0 0 0 0
Comrie Flood Protection Scheme 6,193 21,481 7,830 0 0 0 0 29,311
Milnathort Flood Protection Scheme 72 267 0 0 0 0 0 267
South Kinross Flood protection Scheme 239 1,962 8,823 3,150 75 0 0 14,010
Flood Mitigation Measures - Dunkeld and Buckie Braes 8 72 48 180 375 317 0 992
Coastal Change Adaptation 48 52 0 0 0 0 0 52
Climate Change
Nature Restoration 232 0 0 0 0 0 0 0
Waste Strategy
Recycling Improvement Fund 98 0 0 0 0 0 0 0
Scottish Government Grant (98) 0 0 0 0 0 0 0
Prudential Borrowing
Wheeled Bin Replacement Programme - Domestic Bins 267 200 200 200 220 220 225 1,265
Wheeled Bin Replacement Programme - Commercial Bins 161 20 20 20 25 25 25 135
Recycling Containers, Oil Banks & Battery Banks - Replacement Programme209 105 105 105 70 70 75 530
Capital Receipts - Disposal (2) 0 0 0 0 0 0 0
Litter Bins 50 50 50 50 55 55 55 315
Vehicle Replacement Programme 5,495 5,777 2,942 2,692 3,311 3,394 3,500 21,616
Capital Receipts - Vehicle Disposals (550) (578) (294) (269) (331) (339) (350) (2,161)
Street Lighting Renewal - LED & Column Replacement 958 835 551 592 0 0 0 1,978
TOTAL 30,760 46,769 36,099 22,104 17,851 16,103 16,700 155,626
Page 155 of 162

Page 156

PERTH & KINROSS COUNCIL APPENDIX II
COMPOSITE CAPITAL BUDGET 2025/26 to 2030/31
Revised Approved Approved Approved Approved Approved Approved Approved
Budget Budget Budget Budget Budget Budget Budget Total
HOUSING & COMMUNITIES Budget
2025/26-
PROJECT/NATURE OF EXPENDITURE 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2030/31
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Community Greenspace
Play Areas - Improvements Implementation Strategy 641 872 150 150 500 500 500 2,672
Third Party Contribution (4) 0 0 0 0 0 0 0
3G Pitch, Blairgowrie 117 0 0 0 0 0 0 0
Settlement/Neigbourhood Parks 250 300 0 0 0 0 0 300
Third Party Contribution (84) 0 0 0 0 0 0 0
Countryside Sites 0 0 0 139 0 0 0 139
Community Greenspace Sites 0 654 898 894 700 700 250 4,096
Community Greenspace Bridges 197 0 0 0 0 0 0 0
Third Party Contribution (13) 0 0 0 0 0 0 0
Core Path Implementation 110 0 0 0 0 0 0 0
Third Party Contribution (110) 0 0 0 0 0 0 0
Premier parks 46 0 0 0 0 0 0 0
Third Party Contribution (14) 0 0 0 0 0 0 0
Kinoull Hill 8 0 0 0 0 0 0 0
Cemetery Extensions 13 60 445 375 300 300 200 1,680
Housing Projects
Gypsy Travellers Site Improvement Works 185 0 0 0 0 0 0 0
Additional Gypsy Traveller Site Improvement Works 225 0 0 0 0 0 0 0
New Gypsy Traveller Site 6 1,990 0 0 0 0 0 1,990
Public Transport
Community Transport Iniatives 181 18 0 0 0 0 0 18
Prudential Borrowing Projects
Community Transport Vehicles 0 115 0 0 0 0 0 115
Community Planning
Community-Led Asset Transfers 75 0 0 0 0 0 0 0
TOTAL 1,829 4,009 1,493 1,558 1,500 1,500 950 11,010
Page 156 of 162

Page 157

PERTH & KINROSS COUNCIL APPENDIX II
COMPOSITE CAPITAL BUDGET 2025/26 to 2030/31
Revised Approved Approved Approved Approved Approved Approved Approved
Budget Budget Budget Budget Budget Budget Budget Total
ECONOMY, DEVELOPMENT & PLANNING Budget
2025/26-
PROJECT/NATURE OF EXPENDITURE 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2030/31
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Improvement Schemes
A9/A85 Road Junction Improvements 212 0 0 0 0 0 0 0
Cross Tay Link Road (CTLR) 44,745 0 0 0 0 0 0 0
Bertha Park Link Road 686 400 10,000 1,808 0 0 0 12,208
Perth & Kinross Place-making
Perth, Place, People 0 0 3,598 0 0 0 0 3,598
Perth City Centre Golden Route (Rail Station) 23 45 0 0 0 0 0 45
City Greening 0 31 0 0 0 0 0 31
Perth & Kinross Lighting Action Plan 476 844 0 0 0 0 0 844
Other Planning Projects
Low Carbon Transport & Active Travel Hub - Broxden EV Chargers (74) 0 0 0 0 0 0 0
Third Party Contribution - ERDF (2) 0 0 0 0 0 0 0
Third Party Contribution - Tay Cities Deal 69 0 0 0 0 0 0 0
Revenue Contribution 7 0 0 0 0 0 0 0
Perth Eco-Innovation Park at Perth West 780 9,737 22,300 0 0 0 0 32,037
Third Party Contribution - Tay Cities Deal 0 (550) (505) (3,945) (500) (956) 0 (6,456)
Other Third Party Contributions 0 0 (2,000) (3,000) (1,000) (1,000) (1,000) (8,000)
Capital Receipts - Ring-Fenced Land Disposals 0 0 (550) (725) (650) (680) (650) (3,255)
Economic Development Investment - Land & Serviced sites 1,000 1,000 0 0 0 0 0 1,000
Adapt Your Property - Vacant Town & City Centre Space 300 0 0 0 0 0 0 0
Commercial Property Investment Programme
North Muirton Industrial Estate - Site Servicing & Provision of Units 43 0 0 0 0 0 0 0
Broxden Business Park - Additional Infrastructure 6 0 0 0 0 0 0 0
Western Edge, Kinross - Site Servicing (17) 0 0 0 0 0 0 0
Broxden Drainage Mitigation Works 1,225 0 0 0 0 0 0 0
Third Party Contribution (Scottish Water) (919) 0 0 0 0 0 0 0
TOTAL CARRIED FORWARD 48,560 11,507 32,843 (5,862) (2,150) (2,636) (1,650) 32,052
Page 157 of 162

Page 158

Revised Approved Approved Approved Approved Approved Approved Approved
Budget Budget Budget Budget Budget Budget Budget Total
ECONOMY, DEVELOPMENT & PLANNING Budget
2025/26-
PROJECT/NATURE OF EXPENDITURE 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2030/31
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
TOTAL BROUGHT FORWARD 48,560 11,507 32,843 (5,862) (2,150) (2,636) (1,650) 32,052
Ruthvenfield Business Centre 1,356 0 0 0 0 0 0 0
North Muirton - Drainage 2 0 0 0 0 0 0 0
Prudential Borrowing Projects
Land Purchase & Development 950 950 0 0 0 0 0 950
TOTAL 50,868 12,457 32,843 (5,862) (2,150) (2,636) (1,650) 33,002
Page 158 of 162

Page 159

PERTH & KINROSS COUNCIL APPENDIX II
COMPOSITE CAPITAL BUDGET 2025/26 to 2030/31
Revised Approved Approved Approved Approved Approved Approved Approved
Budget Budget Budget Budget Budget Budget Budget Total
PROPERTY SERVICES Budget
2025/26-
PROJECT/NATURE OF EXPENDITURE 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2030/31
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Property Services - Project support
Investment in the Learning Estate 1,591 13,050 8,650 6,823 0 0 0 28,523
Methven Primary School Refurbishment 206 3,500 300 0 0 0 0 3,800
Kirkmichael Primary School Upgrade 25 0 0 0 0 0 0 0
New Primary School at Bertha Park Site 0 341 7,672 15,400 0 0 0 23,413
Riverside Primary School 483 0 0 0 0 0 0 0
Perth Academy - Refurbishments 3,050 1,650 299 0 0 0 0 1,949
Perth Grammar School - Upgrade Programme (Phase 3) 1,000 1,500 1,488 0 0 0 0 2,988
Perth High School Internal Services & Refurbishment 12 0 0 0 0 0 0 0
Perth High School - New School Investment 40,899 6,600 3,600 0 0 0 0 10,200
Harris Academy/Invergowrie - Extension 591 0 0 0 0 0 0 0
Blairgowrie Recreation Centre - Replacement 15,327 1,303 0 0 0 0 0 1,303
Technology Expansion 115 771 483 0 0 0 0 1,254
Property Services - Projects & Contracts
Free School Mean Expansion Programme 0 1,000 2,511 0 0 0 0 3,511
Community Campus Access adaptations 0 25 0 0 0 0 0 25
Property Service Manager
DDA Adaptation & Alteration Works Programme 130 300 200 200 0 0 0 700
Property Compliance Works Programme 1,017 650 650 400 0 0 0 1,700
Capital Improvement Projects Programme (including School Estate) 2,265 1,800 1,800 894 10,000 10,000 11,000 35,494
Pitlochry High School - Upgrade Programme 104 60 0 0 0 0 0 60
Friarton Depot - Waste Transfer Station 250 2,531 0 0 0 0 0 2,531
TOTAL CARRIED FORWARD 67,065 35,081 27,653 23,717 10,000 10,000 11,000 117,451
Page 159 of 162

Page 160

Revised Approved Approved Approved Approved Approved Approved Approved
Budget Budget Budget Budget Budget Budget Budget Total
PROPERTY SERVICES Budget
2025/26-
PROJECT/NATURE OF EXPENDITURE 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2030/31
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
TOTAL BROUGHT FORWARD 67,065 35,081 27,653 23,717 10,000 10,000 11,000 117,451
Energy Efficiency Works - Various Properties 36 0 0 0 0 0 0 0
Revenue Contribution (Salix Reserve) (36) 0 0 0 0 0 0 0
Letham Wellbeing Hub 95 0 0 0 0 0 0 0
PH2O 500 2,000 25,000 25,000 25,000 12,500 0 89,500
Crieff Drummond Armsa - Regeneration 0 3,000 0 0 0 0 0 3,000
Perth Museum 167 0 0 0 0 0 0 0
Perth Art Gallery 100 2,795 0 0 0 0 0 2,795
Prudential Borrowing Projects
Decarbonisation 739 600 0 0 0 0 0 600
Energy Conservation & Carbon Reduction Programme 146 150 150 150 150 150 150 900
Pullar House - Purchase & Repurposing 0 10,000 0 0 0 0 0 10,000
Kinnoull Street Car Park - Purchase 0 2,250 0 0 0 0 0 2,250
TOTAL 68,812 55,876 52,803 48,867 35,150 22,650 11,150 226,496
Page 160 of 162

Page 161

PERTH & KINROSS COUNCIL APPENDIX II
COMPOSITE CAPITAL BUDGET 2025/26 to 2030/31
Revised Approved Approved Approved Approved Approved Approved Approved
Budget Budget Budget Budget Budget Budget Budget Total
CUSTOMER & DIGITAL SERVICES Budget
2025/26-
PROJECT/NATURE OF EXPENDITURE 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2030/31
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Customer & Digital Services
ICT Infrastructure & Replacement & Upgrade Programme 4,927 3,112 3,273 7,698 6,472 3,687 5,000 29,242
Data & Analytics 600 1,206 720 708 716 733 650 4,733
Supporting Digital 750 1,175 928 1,185 914 920 1,000 6,122
Software Licences (Revenues & Benefits) 51 51 51 49 0 0 0 151
School Audio-Visual (AV) Equipment Replacement Programme 125 35 106 35 300 471 200 1,147
Swift Social Work System Replacement (Mosaic) 1,712 430 180 586 0 0 0 1,196
Revenue Contribution 0 (124) (124) (124) 0 0 0 (372)
PC Replacement & IT Upgrades - Hardware 22 15 14 14 25 25 25 118
PC Replacement & IT Upgrades - Licenses 80 95 71 71 75 75 75 462
Case Management System 80 0 0 0 0 0 0 0
TOTAL 8,347 5,995 5,219 10,222 8,502 5,911 6,950 42,799
Page 161 of 162

Page 162

PERTH & KINROSS COUNCIL APPENDIX II
COMPOSITE CAPITAL BUDGET 2025/26 to 2030/31
Revised Approved Approved Approved Approved Approved Approved Approved
Budget Budget Budget Budget Budget Budget Budget Total
HEALTH & SOCIAL CARE Budget
2025/26-
PROJECT/NATURE OF EXPENDITURE 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2030/31
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Occupational Therapy Equipment 650 250 250 150 250 100 300 1,300
Technology Enabled Telecare 360 1,088 1,087 1,087 1,000 1,000 1,000 6,262
Moving & Handling Office Refurbishment 0 29 0 0 0 0 0 29
Software Licences 52 53 53 69 70 70 70 385
Developing Supported Tenancies 0 229 0 0 0 0 0 229
TOTAL 1,062 1,649 1,390 1,306 1,320 1,170 1,370 8,205
Page 162 of 162