Argyll and Bute Council
Development & Economic Growth   
Delegated or Committee Planning Application Report and Report of handling as required
by Schedule 2 of the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2008 relative to applications for Planning Permission or Planning
Permission in Principle
____________________________________________________________________________ 
Reference No:  22/00921/PP 
Planning Hierarchy: Local Application 
Applicant:  Mr Paul David Barker   
Proposal:         Application for Discharge of Section 75 Obligation relative to Planning
Permission 97/01526/DET           
Site Address:   Melda House, Kilfinan, by Tighnabruaich      
____________________________________________________________________________  
DECISION ROUTE 
Local Government Scotland Act 1973 
____________________________________________________________________________ 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission 
Discharge of Section 75 Obligation relative to Planning Permission
97/01526/DET 
(ii) Other specified operations 
None
____________________________________________________________________________ 
(B) RECOMMENDATION: 
It is recommended that the Section 75 obligation relative to Planning Permission
97/01526/DET be discharged.
____________________________________________________________________________ 
(C) HISTORY: 
Planning Permission (ref: 01/92/0293) was granted on 11th August 1992 for the formation
of a car park at the site.   
Planning Permission (ref: 01-93-0363) was granted on 1st July 1993 for the formation of
fishing facilities at the site for a temporary period of three years. 
An application for Planning Permission (ref: 97/00968/DET) was refused on 8th
September 1997 for a dwellinghouse, office and shop on the site. 
Planning Permission (ref: 97/01526/DET) was granted on 7th April 1998 for the erection
of a dwellinghouse, office and shop on the site. The approval was issued upon the

Page 2

conclusion of a Section 75 obligation tying the ownership of the dwellinghouse, office
and shop to the fishing enterprise that existed at Loch Melldalloch. 
Planning Permission (ref: 02/01555/DET) was granted on 10th October 2002 for
amended access arrangements and the removal of Condition 2 in relation to permission
97/01526/DET. 
Non Material Amendment (ref: 03/00711/NMA) was granted on 6th May 2003 for an
amendment to the position of the building. 
Non Material Amendment (ref: 10/00178/NMA) was granted on 4th March 2010 to
incorporate an amended door design; deletion of window; and installation of two dormer
windows. 
Non Material Amendment (ref: 10/01012/NMA) was granted on 28th June 2010 to
incorporate alterations in window sizes. 
Non Material Amendment (ref: 12/02720/NMA) was granted on 18th December 2012 for
the addition of two velux windows in the dining area of the building.  
____________________________________________________________________________ 
(D) CONSULTATIONS: 
Not applicable.
____________________________________________________________________________ 
(E) PUBLICITY:   
Not applicable.
____________________________________________________________________________ 
(F) REPRESENTATIONS: 
None.
____________________________________________________________________________ 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Statement:  No 
(ii) An appropriate assessment under the Conservation (Natural Habitats)
Regulations 1994:   No 
(iii) A design or design/access statement:   No 
(iv) A report on the impact of the proposed development eg. Retail impact,
transport impact, noise impact, flood risk, drainage impact etc:  No 
(v) Supporting Statement: Yes
____________________________________________________________________________ 
(H) PLANNING OBLIGATIONS 
(i) Is a Section 75 obligation required: No

Page 3

The current application seeks to discharge the existing Section 75 obligation
____________________________________________________________________________ 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30, 31 or
32:  No
____________________________________________________________________________ 
(J)  Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account in
assessment of the application.   
Argyll and Bute Local Development Plan (26th March 2015) 
LDP STRAT1 – Sustainable Development
LDP DM1 – Development within the Development Management Zones
LDP 8 – Supporting the Strength of Our Communities
LDP 9 – Development Setting, Layout and Design
LDP 11 – Improving our Connectivity and Infrastructure 
Argyll and Bute Supplementary Guidance (approved March 2016) 
SG LDP ENV13 – Development Impact on Areas of Panoramic Quality (APQs)
SG LDP HOU 1 – General Housing Development Including Affordable Housing
Provision 
SG LDP TRAN 4 – New and Existing, Public Roads and Private Access Regimes
SG LDP TRAN 6 – Vehicle Parking Provision
SG2 Sustainable Siting and Design Principles 
(ii) List of all other material planning considerations taken into account in the
assessment of the application, having due regard to Annex A of Circular
3/2013.  
Scottish Planning Policy (2014)
Planning History
Circular 3/2012: Planning Obligations and Good Neighbour Agreements
Letter from Chief Planning Officer to Planning Authorities dated 4th November
2011 in respect of limitations on occupancy 
Argyll and Bute Proposed Local Development Plan 2 (November 2019) 
The unchallenged policies and proposals within pLDP2 may be afforded
significant material weighting in the determination of planning applications at this
time as the settled and unopposed view of the Council. Elements of the pLDP2
which have been identified as being subject to unresolved objections still require
to be subject of Examination by a Scottish Government appointed Reporter and
cannot be afforded significant material weighting at this time. The relevant
provisions of pLDP2 that may be afforded significant weighting in the
determination of this application are listed below: 
Policy 23 – Tourist Development, Accommodation, Infrastructure and Facilities 
Policy 26 – Informal Public Outdoor Recreation and Leisure Related
Development

Page 4

Policy 49 – Sport, Recreation and Community Facilities    
____________________________________________________________________________ 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental Impact
Assessment:  No 
____________________________________________________________________________ 
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  No
____________________________________________________________________________ 
(M) Has a sustainability check list been submitted:  No
____________________________________________________________________________ 
(N) Does the Council have an interest in the site:  No
____________________________________________________________________________ 
(O) Requirement for a hearing (PAN41 or other):  No
____________________________________________________________________________ 
(P) Assessment and summary of determining issues and material considerations 
Background 
Loch Melldalloch is located halfway along the B8000 road between Millhouse and
Kilfinan to the north-west of Tighnabruaich. In 1997, an application for Planning
Permission (ref: 97/00968/DET) was submitted for the erection of a dwellinghouse, office
and shop on land between the south-west corner of the loch and the main public road. 
The applicant at the time (Mr Neil Jack) had been developing the commercial fishing
potential of Loch Melldalloch for some years previously through the provision of stock
(brown trout), infrastructure (access tracks, jetty, etc,) and basic facilities (temporary
shelter). It was claimed, however, that the lack of on-site facilities and the requirements
of managing live fish stock meant that the commercial fishing business could not be
developed to its full potential. 
A claim of locational and operational need was put forward that explained the benefits of
introducing a constant on-site presence: passive policing (thereby limiting poaching and
unauthorised fishing); security/ticket control; essential storage; business base (office);
assistance and welcome for anglers and tourists; shelter and amenities for customers;
provision of angling-related supplies for loch users and greater marketing opportunities
(to passers-by, tourists, etc.). 
The exceptional circumstances associated with application 97/00968/DET were
accepted but it was considered that the proposed scale, massing and design of the
building would be particularly overbearing and not in keeping with the character of the
area. In addition, the proposed foul drainage arrangements were deemed to be
unacceptable. On this basis, Planning Permission was refused on 8th September 1997. 
A fresh application (ref: 97/01526/DET) was subsequently submitted and the issues
associated with the previous proposal had been satisfactorily addressed. A more
appropriate massing had been achieved for the building and, in design terms, it was
reminiscent of a large farmhouse with the presentation of a more traditional gable end on
its most prominent, south east-facing elevation. Finishes such as natural slate and
timber sash and casement windows would also lend a more traditional appearance to
the building. In addition, the private sewage system was technically acceptable.

Page 5

After consideration by the Bute and Cowal Area Committee on 2nd November 1997,
Planning Permission was granted on 7th April 1998 subject to the conclusion of a Section
75 agreement (now obligation). This obligation was considered necessary as it
underpinned the locational and operational need claim associated with the application. 
Works commenced on the development prior to the expiry of permission 97/01526/DET
on 7th April 2003 and it is understood that this was a self-build project by Mr Barker with
the consequence that construction has taken a significant number of years. 
Section 75 Obligation 
There are two principal restrictions contained in the First Clause of the Section 75. The
first provides that the dwellinghouse, office and shop shall not be owned, leased or
otherwise occupied independently from the existing fishing venture and the second
restriction is the declaration that the dwellinghouse, office and shop shall in all time
coming be conveyed, leased or otherwise disposed of as a single unit, along with the
fishing venture, held under one title. 
Whilst the wording of the Section 75 does not specifically tie either the fishing venture or
the dwellinghouse, office and shop to the whole of the original ‘Development Site’ (which
covers approximately 25 hectares), the fishing venture was intrinsically linked to Loch
Melldalloch so it is reasonable to infer that the loch is part of the “one title” referred to in
the First Clause of the Section 75.   
In summarising the above, 
 A supporting statement was submitted by the applicant at the time in relation to
application 97/01526/DET and this was accepted as demonstrating a locational
and operational need for a dwellinghouse, office and shop in association with the
fishing venture at Loch Melldalloch 
 Officers evaluated the siting, design and appearance of the building and
considered it to be acceptable 
 The use of the Section 75 agreement (now obligation) reflected custom and
practice at that particular time 
The Applicant’s Case 
Mr Paul Barker (the current applicant) has submitted a Supporting Statement, which can
be summarised as follows: 
 Mr Barker bought the land and loch from the original applicant, Mr Neil Jack, in
2002 and the sale particulars made mention of a possible business income from
the fishing venture. He found this to be a particularly attractive proposition as he
already owned several businesses and was starting to look at winding down
some of them for a better work/life balance 
 At the outset, he was based in a touring caravan on a part-time basis on the site
and he set up a deal with the nearby Kilfinan Hotel and Melldalloch Holiday
Lodges to sell day tickets, so that it was possible for people to pay to fish in his
absence. He advises that this was not a great success and the amount of income
was trivial 
 He states that the overheads associated with damage and antisocial behaviour
were endless. He describes removing litter by the wheelbarrow load from the

Page 6

banks of the loch and from the small island that was accessed by a bridge. He
feels that the source of the litter was not all due to the fishing activity 
 He mentions that there were also serious cases of criminality over the years,
including the emptying of his diesel tank (some 300 litres) in May 2005; the
breaking into his caravan and its occupation over a period of time in October
2008; and the breaking up of a fence for use as fire wood in September 2009 
 In January 2011, the applicant decided to remove the bridge to the island and
this, coupled with the sale of the Kilfinan Hotel to new owners, resulted in a
natural decline in fishing activity. He began to spend more time on the site to
facilitate the building of the house and there was a small amount of fishing
activity at this time; however, the takings were insufficient to pay the public
liability insurance premium 
 In 2012, he decided that the fishing venture was not worthwhile and considered it
to be closed. As the business is long gone and is never likely to be revisited, the
applicant can see no justification in keeping the Section 75 that refers specifically
to the “fishing venture” 
 He considers that having the Section 75 associated with the property is a blight
that is currently preventing the reclaim of VAT on the house build 
 Looking into the future when he is no longer fit and able to live at the site, he is of
the opinion that the sale of the property would be adversely affected by the
presence of the Section 75 and its impact on the ability of a buyer to obtain
mortgage funding 
Assessment of Request to Discharge Section 75 Obligation 
Over the last ten years or so, the use of Section 75 obligations as an appropriate
mechanism to underpin support for housing required in association with crofting;
agricultural employment; and other rural businesses has been phased out. 
In situations where Planning Permission would not normally be given for croft and
agricultural dwellinghouses but an exceptional case has been demonstrated, the Council
normally attaches conditions requiring the permission to be implemented in accordance
with a business case / development plan. 
The current request relates to a historic application where there was no condition linking
the occupation of the dwelling to a submitted business plan. However, the fishing
venture at the loch was the principal element of the locational and operational need for
the development and was accepted by both officers and Members in the decision to
approve the dwellinghouse. 
The officer’s report at the time also states that, “after a long and careful scrutiny of the
area, I consider that this is the best available site for development within the vicinity of
the loch should the operational need and requirement to have a physical presence by
the loch be accepted.” In addition, whilst acknowledging that the proposal was a
relatively large building, it would be “in keeping with the character of the overall area and
will not have a seriously detrimental visual impact on the wider Scenic Area.”         
In this particular case, and according to the applicant, he did attempt to continue with the
fishing venture after his purchase of Loch Melldalloch and its associated land in 2002.
However, due to the combination of factors that he has set out in his supporting
statement, the business did not prove to be viable.

Page 7

The reality of the situation is, therefore, that the fishing business no longer exists and
this is clearly a significant factor. When added to the other material considerations – that
the development is visually acceptable; the advice of the Chief Planner, Scottish
Planning Policy and Circular 3/2012; and appeal decisions made in recent years – it is
considered reasonable to accede to the request for the discharge of the Section 75
obligation. 
____________________________________________________________________________ 
(Q) Is the proposal consistent with the Development Plan:  Yes
____________________________________________________________________________ 
(R) Reasons why planning permission or a Planning Permission in Principle should
be granted 
The circumstances of this case are as follows: 
• The dwellinghouse has been determined to be visually acceptable 
• The fishing business at Loch Melldalloch to which the dwellinghouse was tied has
ceased  
• The permission and Section 75 for 97/01526/DET was approved many years
prior to the currently agreed appropriate control mechanisms 
• Appeal decisions over the last six years indicate that the use of the Section 75
would not be supported at appeal and there would be a risk of an expenses
award against the Council in any appeal.   
It is considered reasonable in these circumstances that approval should be granted for
the discharge of the Section 75 obligation relative to Planning Permission
97/01526/DET. 
______________________________________________________________________ 
(S) Reasoned justification for a departure to the provisions of the Development Plan 
N/A
____________________________________________________________________________ 
(T) Need for notification to Scottish Ministers or Historic Scotland:  N
____________________________________________________________________________ 
Author of Report:  Steven Gove     Date:  28th July 2022 
Reviewing Officer: Howard Young       Date:  28th July 2022 