Democracy Spraffa

Appendix E - Ice Options

Perth and Kinross Council · 4 September 2024
Back to Perth and Kinross Council — 4 September 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Appendix E
Ice Options 
1. EXECUTIVE SUMMARY
1.1 On 22 January 2024, the findings and recommendations of the Transformation of
Leisure Assets Review was presented to Council (Report 24/19 refers). Council
agreed to:
1. Note the Review findings set out in section 5 of the report. In relation to
paragraph 5.3, considers that the information on past and current usage
as well as future trends does not provide sufficient evidence to support the
removal of ice from the mix of activities available at PH2O.
2. Approves the recommendations set out in section 6 of the report, subject
to deletion of recommendation 2 and replacement with:
(i) Further work to be undertaken on curling usage, market trends, and
affordability factors, including current curling demand and usage for
2023/24 and consideration of growth opportunities for curling.
(ii) Options for the sustainable provision of ice at PH2O being included
within the transition plan and rescoping exercise referred to in
recommendation 3 in section 6.1. 
(iii) Officers be instructed to include an ice rink component within a fully
costed PH2O proposal to be brought to Council in August 2024.
3. Approves the next steps set out in section 7 of the report and additionally
asks that:
(i) The Council’s contract for services with Live Active Leisure
maintains family-friendly leisure swimming as a core service
requirement, as an activity which enables a broad section of the
local population to be healthy and active.
(ii) The design of a new swimming pool for Perth, as part of the
rescoped PH2O project, reflects this requirement and will allow a
family-friendly leisure swim offering alongside fitness and lesson
swims. 
1.2 This appendix provides details of the work undertaken to progress the instruction
of Council in relation to undertaking further work on curling/ice provision and
provides more information to support recommendations 5a and 5b in the
covering report. Details of options for other leisure facilities requested by Council
are contained in Appendix C.
2. BACKGROUND

Page 2

2.1 In 2012 Perth Ice Rink (1988) Ltd transferred ownership and management of
Dewars Centre in Perth to Live Active Leisure (LAL) amid requirements for
essential investment in the building and replacement of specialist ice plant. At
time of transfer the building was not self-sustaining, and amid rising energy costs
and the impact of Covid-19 this has worsened with the running of the building
requiring a subsidy of £8.49 per user/per visit previously reported in the
Transformation Review of Leisure Assets. 
2.2 In October 2021 Council instructed the development of an Outline Business Case
(OBC) for the PH2O project to enable it to be considered within the Council’s
future capital programme. PH2O Outline Business Case (OBC) was completed
and presented to members in February 2022. The OBC tested a long list of
options and undertook sensitivity testing on the preferred Strategic Business
Case option which had an increased estimated capital expenditure cost of £85-
90M (due to construction inflation), against a smaller scale core option (excluding
leisure water, bowling, gym/fitness and health spa) which had a reduced capital
expenditure cost of £67-70M. 
2.3 The Council approved the preferred option for PH2O at an outline cost of £85-
90M on 23 February 2022 (Report 22/36 refers). 
2.4 In March 2023, the Council decided to pause the project and instructed officers
to undertake a Transformation Review of Leisure Assets (the ‘Leisure Asset
Review’), on the grounds of overall project affordability with increased loan
charge rates, energy price rises and general inflation pressures. The existing
budget provision for the project of £90 M was retained in the budget pending
the outcome of the review. 
2.5 The Transformation Review of Leisure Assets, submitted to Council on 22
January 2024 focused on:
 Current and future usage trends for key leisure activities
 Accessibility of leisure facilities for the population of Perth and Kinross
 Cost and usage analysis for key facilities
 Energy efficiency considerations; Perth leisure provision: key issues
2.6 The review recommended that the facilities mix previously proposed for PH2O
should be reduced in light of findings in relation to usage and market trends, and
affordability factors and that three facility’s functions (Perth Leisure Pool/ Dewars/
Bells) be co-located on one site for efficiency. 
2.7 In addition to this Council instructed that facilities modelling be undertaken to
establish the feasibility of incorporating a sustainable ice component into the
revised PH2O proposal.

Page 3

2.8 Council also instructed that additional work be undertaken to explore the current
and future projections relating to curling, considering:
 curling usage
 market trends
 affordability factors
 current curling demand,
 usage for 2023/24 and, 
 consideration of growth opportunities for curling
2.9 In accordance with Council instruction Council officers have engaged with the
following key stakeholders:
 Scottish Curling 
 representatives of Perth Curlers
 sportscotland
 Council/ LAL officers
 Integratis, sport and leisure consultants
2.10 In addition to this, Council officers have completed site visits to other facilities to
understand alternate styles and models for ice provision.
3. EVIDENCE OF DEMAND 
3.1 As instructed, modelling has been undertaken to establish the feasibility of
incorporating an ice component into the PH2O base case proposal. Officers have
engaged with key representatives from Scottish Curling, World Curling and
sportscotland to review our initial data regarding curling demand/usage, potential
future growth and viable business model options for PH2O. 
3.2 Data provided does not substantiate predictions of additional projected growth in
usage, officers are therefore satisfied that the data provided to Council
relating to curling demand in January 2024 is accurate.
3.3 The most recent 2023/24 data shows that 600-700 curling members account for
80-90% of 11,112 curling visits to Dewars per year, plus approximately 5,288
visits to events a year, providing a 2023/24 total income of £178,428. 
3.4 There is a national and local declining market trend in curling participation - the
facilities operate in the curling season September to March (27 weeks) only. The
Scottish Curling national target is for participation to increase by 6% per annum.
3.5 Scottish Curling have provided data which shows that across Scotland national
curling membership is in steady decline:

Page 4

3.6 Data relating specifically to the Dewars Centre confirms the same ongoing
decline:
3.7 Assuming the market trend stabilizes rather than diminishes, a 6% rise in usage
from 11,112 visits translates to 666 visits additional visits.
3.8 During the 2023/24 season, Dewars hosted 9 curling competitions over the
course of 26 weekends, with 4 of these events being exclusive curling club
weekends.

Page 5

3.9 Hosting future National and International curling events cannot be guaranteed
due to the bidding process set by the Scottish Curling and the World Curling
(former World Curling Federation). World Curling has bidding guidelines for any
host site of a WCF Event. The guidelines state a major contribution to the
successful outcome of a bid would be evidence of support, both financially
and value in kind, of Government and other agencies. This includes any
costs anticipated as a result of any hosting responsibilities outlined in the bidding
guidelines. 
3.10 Of the 22 ice rinks in Scotland, there are five within a 45 minute to 1 hour drive of
Perth.
3.11 The current large scale 8 lane facilities at Dewars are most heavily used in the
early weekday evenings, with low usage at other times:
3.12 Where there is not a curling event booked, LAL provides skating on weekends
The demand for this was 8,442 users in 2023-2024. 
3.13 Current charges for curling sessions are considered low and Scottish Curling/
Perth curling community consider that charges could increase by 10-25% without
significantly reducing participation. Pricing increases have been factored into
financial forecasts.
3.14 Scottish Curling considered that if facilities were closed for redevelopment for two
or more years, it is likely that 25-40% of current Dewars curlers would not return
to a redeveloped/ new facility. This potential decrease in participation is a
crucial factor, as long-term interruption in ice availability could further

Page 6

adversely affect the long-term sustainability, viability and demand/ need for
ice provision.
3.15 Options for ice have been considered over 4, 6 or 8 lanes:
 4 lanes are considered to be too small to sustain the aspirations of Perth
curlers and Scottish Curling with an inability to host significant
competitions.
 6 lanes are considered the minimum size of ice to host competitions and
accommodate peak demand in Perth.
 8 lanes are considered too large for current demand but optimum for
national/ international events.
3.16 The current facilities are regarded as suitable for events and world level events
have been staged at Dewars Centre in the past. The 8 lane rink benefits from
ample viewing galleries, adjacent accommodation to support multiple participants
and teams and social/ catering/ licensed bar facilities. These facilities are
considered essential to provide a full-scale event. For international events
broadcasting facilities would also be sought. The current facilities, being separate
from the main Perth Leisure Pool (PLP), allow large weekend events to be
hosted concurrently with normal swimming pool activity. Co-locating facilities
would require careful planning/ sharing of accommodation especially catering
and/or licensed premises.  
3.17 Currently Dewars and PLP are supported by 374 parking spaces. Initial
discussions with planning colleagues suggest future provision for any new
development for approximately 70 car parking spaces – 10% less users are
projected due to parking reductions from the current levels, this has been
factored into income and expenditure projections for all options.
4. ICE PROVISION OPTIONS
4.1 Options were developed around key factors of: 
 demand and future growth potential 
 scale of facilities / number of rinks
4.2 Ice options have been modelled as extensions to the PH2O base case options
detailed in Appendix B considering the possibility of newbuilds or refurbishments/
extensions on different buildings and sites.
4.3 It is accepted that during summer, the revenue from ice operations does not
meet expenses, making it economically unsustainable to run these leisure
services. However, financial projections indicate that ice facilities, if incorporated
within a multi-purpose sports complex and only operational from October to
March, can cover running costs. Therefore, curling facility operating costs within

Page 7

these options are modelled on a seasonal operation, with closures anticipated for
over 26 weeks annually, aligning with the current operational strategy.
5. OPTIONS APPRAISAL
Option F – New Build on Site of Existing Dewars Centre – Base Case
Option B (from Appendix B) + Ice
5.1 Construction of a new build PH2O leisure centre on the site of the existing
Dewars Centre, with swimming pools, dry sports and 6 lane ice rink. Existing PLP
to remain operational (if possible) throughout the construction of the new build
and demolished once PH2O opened, but loss of ice/gym facilities for at least 2
years. Significant disruption on site over an extended period.
5.2 This option benefits from shared accommodation and energy/ plant
arrangements with pool/ ice (heat/ energy) generation in a new facility. 
5.3 Based on Scottish Curling’s advice at 4.14 about the likelihood that 25-40% of
curlers would not return if facilities were closed for two or more years, this
presents issues with the viability of this option as it requires the closure of
Dewars during construction.
5.4 Additional costs to add ice provision to Base Case Option B:

Page 8

Capital Investment
Required
Base Case
Cost
Additional Ice
Cost
Total
Refurbishment £65M £13M £78M
Revenue Investment Required
Capital loan charges £2.9M rising
over 40 years
£0.6M rising over
40 years
£3.5M rising
to £5.4M
over 40
years
Operating Subsidy
(2028/2029)
£1,228,840 £0 £1,228,840
Total Annual Revenue Investment: £4,728,840
initially
rising with
inflation
Option G - Refurbish Dewars, Demolish Perth Leisure Pool – Base Case
Option C (from Appendix B) + Ice
5.5 Refurbishment and extension of the existing Dewars Centre, with swimming
pools, dry sports and retained ice rink. Existing PLP to remain operational (if
possible) throughout the construction of the new build and demolished once
PH2O opened, but loss of ice/gym facilities for at least 2 years. Significant
disruption on site over an extended period. Significant disruption on site over an
extended period.

Page 9

5.6 This option benefits from shared accommodation and energy/ plant
arrangements with pool/ ice (heat/ energy), but likely not as efficiently as a new
build. 
5.7 Based on Scottish Curling’s advice at 4.14 about the likelihood that 25-40% of
curlers would not return if facilities were closed for two or more years, this
presents issues with the viability of this option as it requires the closure of
Dewars during construction.
5.8 Additional costs to add ice provision to Base Case Option C:
Capital Investment
Required
Base Case
Cost
Additional Ice
Cost
Total
Refurbishment £65M £13M £78M
Revenue Investment Required
Capital loan charges £2.9M rising
over 40 years
£0.6M rising over
40 years
£3.5M rising
over 40
years
Operating Subsidy
(2028/2029)
£1,228,840 £0 £1,228,840
Total Annual Revenue Investment: £4,728,840
initially
rising with
inflation
Option H – Refurbish Perth Leisure Pool, Demolish Dewars - Base Case
Option D (from Appendix B) + Ice

Page 10

5.9 Refurbishment and extension of the existing PLP to form PH2O, with retained
swimming pools (excluding leisure water), dry sports and 6 lane ice rinks.
Existing Dewars Centre to remain operational (if possible) throughout the
refurbishment and extension works and demolished once PH2O opened, but with
loss of swimming facilities for at least 2 years. Significant disruption on site over
an extended period.
5.10 This option benefits from shared accommodation and energy / plant
arrangements with pool / ice (heat / energy) arrangements in a new facility, but
likley not as efficiently as a new build.
5.11 Additional costs to add ice provision to Base Case Option D:
Capital Investment
Required
Base Case
Cost
Additional Ice
Cost
Total
Refurbishment £70M £14M £84M
Revenue Investment Required
Capital loan charges £3.2M rising
over 40 years
£0.6M rising over
40 years
£3.8M rising
over 40
years
Operating Subsidy
(2028/2029)
£1,228,840 £0 £1,228,840
Total Annual Revenue Investment: £5,028,840
initially
rising with
inflation
Option I – New Build at Thimblerow – Based Case Option E (from Appendix
B) + Ice

Page 11

5.12 Construction of a new build PH2O leisure centre on the site of the existing
Thimblerow Car Park, with swimming pools, dry sports and 6 lane ice rink. As
with other options, based on planning advice, 70 spaces of car parking included
on site. However, more parking available within the city centre five minutes
walking/wheeling.
5.13 This option benefits from shared accommodation and energy/ plant
arrangements with pool/ ice (heat/ energy) generation in a new facility 
5.14 Added benefits:
 transition benefits (no disruption to LAL services, continuity of employment
for LAL staff)
 relocating a 400,000 footfall to the city centre supporting economic growth;
and 
 opportunity to deliver a significant priority housing site in Perth in the
medium term.
5.15 Additional costs to add ice provision to Base Case Option E:
Capital Investment
Required
Base Case
Cost
Additional Ice
Cost
Total
New Build £61M £19M £80M
Revenue Investment Required

Page 12

Capital loan charges £2.7M rising to
£4.8M over 40
years
£0.9M rising over
40 years
£3.6M rising
over 40
years
Operating Subsidy
(2028/2029)
£1,228,840 £0 £1,228,840
Total Annual Revenue Investment: £4,828,820
initially
rising with
inflation
Option J – Bell’s Sport Centre
5.16 Refurbishment of the existing Bell’s Sports Centre dome to create a new
standalone ice facility. This is currently vacant with gym and fitness studio
provision having moved to the Dewars Centre. 
5.17 Bell’s Sports Centre is a Category B listed building and Council has instructed
options for its future use be considered. 
5.18 Surveys and assessments of the current building are ongoing but conversion into
a 6-lane curling rink is potentially possible. This would be a standalone facility,
likely separate from the Gannochy Pavilion building.
5.19 Additional cost to provide ice at Bell’s Sport Centre 
Capital Investment Required Base Case Cost
Refurbishment £15M
Revenue Investment Required
Capital loan charges £0.67M per annum rising over 40 years
Operating Subsidy
(2028/2029)
£400,000
5.20 Based on delivery via LAL or equivalent, revenue operating costs are estimated
at £400,000. Rates may be an additional (£300,000) if building becomes vacant.
Option K – User-Led Operation of Dewars Centre
5.21 Curling bodies and/or other interested parties take on lease of Dewars Centre on
a full repairing and insuring basis. Assumes removal of fitness gym/studio
equipment as part of LAL exit from the building as this service would be provided
at PH2O. It would be for curling bodies to determine the commercial case.
However, the Council would have no ongoing financial liability for any element of
ice provision or maintenance and repair of building or plant.

Page 13

5.22 Assumption that PH2O would be built at Thimblerow to allow PLP to remain
operational during transition period. Following the completion of PH2O the
Leisure Pool would be demolished and the remaining site developed for housing.
This would result in the loss of 100 potential new houses compared to the
preferred Base Case option set out in Appendix B.
6. FINANCIAL OPTIONS APPRAISAL FOR ADDITION OF ICE TO BASE CASE
OPTIONS 
Option Additional
Capital Cost
Additional Ice
Revenue Cost
Comment
F - New build at
PLP/ Dewars site,
Glasgow Road –
Base Case Option
B + Ice
£13M Capital loan charges:
£0.6M (rising over 40
years) 
Operating Subsidy:
£0
Maintaining swimming
will mean that ice will
likely be lost for 2-
years plus, based on
Scottish Curling’s
advice if facilities were
closed it was likely that
25-40% of current
Dewars curlers may
not return.
Total: £0.6M initially
G - Refurbishment
of Dewars, Base
Case Option C +
Ice
£13M Capital loan charges:
£0.6M (rising over 40
years) 
Operating Subsidy:
£0
Maintaining swimming
will mean that ice will
likely be lost for 2-
years plus, based on
Scottish Curling’s
advice if facilities were
closed it was likely that
25-40% of current
Dewars curlers may
not return.
Total: £0.6M initially
H – Refurbishment
of Perth Leisure
Pool - Base Case
Option D + Ice
£14M Capital loan charges:
£0.6M (rising over 40
years) 
Operating Subsidy:
£0
Swimming will be lost
for 2+ years
Total: £0.6M initially

Page 14

I – New build at
Thimblerow –
Base Case Option
E + Ice
£19M Capital loan charges
£0.9M (rising over 40
years)
Operating subsidy:
£0
Ice rink on 4th floor at
Thimblerow. Both
swimming and ice
retained during
construction period.
Total: £0.9M initially
J - Bells £15M Capital loan charges
£0.67M (rising over
40 years)
Operating Subsidy: 
£400,00
Offset against
obligations of
maintaining/ owning
the now B listed
building. Assumed LAL
or equivalent
operation.
K – User led
operation of
Dewar’s Centre 
£0 £0 Asset would be
managed and
operated by external
community group
7. CRITICAL SUCCESS FACTORS  
7.1 Critical success factors have been developed to appraise the options as they
were for the original PH2O project and are as follows:
Strategic fit
1. Delivers facilities which meet usage demands
as per the approved recommendations of the
Transformation of Leisure Assets Review
2. Reduces environmental impact through
significant improvement in energy
consumption and supporting a just transition
to net zero
3. Represents the best use of available land
with Council control/ ownership
Value for money 4. Maximise the reduction in operating deficit vs
business as usual
Supplier capacity and
capability
5. Solution reflects an appropriate/ manageable
level of construction risk
Affordability
6. The project can secure funding to the
proposed level of capital expenditure
7. The project represents the most cost-efficient
way of delivery the services as per the
approved recommendations of the Leisure
Asset Review

Page 15

Achievability
8. Maintains access to services during
construction phase and maximises ongoing
LAL financial viability during transition periods
between facilities
8. ICE OPTIONS ASSESSMENT
8.1 The site options were assessed by the Senior Officer Group against the Critical
Success Factors noted in section 7.
Critical Success Factors
Option 1 2 3 4 5 6 7 8
F - New build at PLP/ Dewars
site
G - Refurbish Dewars,
Replace Perth Leisure Pool +
Ice
H - Refurbish Perth Leisure
Pool, Replace Dewars + Ice
I – New build at Thimblerow +
Ice
J - Bells
K - User led operation of
Dewar’s Centre N/A N/A N/A N/A N/A
9. ICE PREFERRED OPTION 
9.1 The recommendation of officers is that there is no case for the provision of ice
beyond the closing date of the existing Dewars Centre due to lack of financial
viability, significant additional borrowing costs, lack of future user base and lack
of alignment strategic direction of Council, based on several key factors:
 Financial considerations: The operation is not financially viable without
incurring significant additional borrowing costs, with the lowest priced
option requiring a £13m capital investment with a supporting revenue cost
of borrowing of £600,000 per annum.
 User base: Trends locally and nationally show a decline market trend for
curling.

Page 16

 Strategic alignment: continuing ice provision does not align with the
principle set out in the Corporate Plan 2022/23-2027/28 to focus on need
informed by evidence and data, rather than demand; and to make best
use of available assets including transferring or otherwise disposing of
those which can best serve the community in a different way. Likewise, it
does not align with the overarching principles in our Investment Blueprint
to support the delivery of sustainable public services through effective
management of our assets, due to significant annual revenue costs when
measured against benefits to the wider community:
 £13M-£19M capital investment to support 600/700 curlers 
 Declining market with no evidence of growth potential 
 Fewer than 0.85% of curlers come from Scottish Index of Multiple
Deprivation Q1 (SIMD)