Democracy Spraffa

Appendix B - Working Smarter - Perth City Centre Car Parking Options and Kinnoull Street Multi-Storey

Perth and Kinross Council · 4 September 2024
Back to Perth and Kinross Council — 4 September 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

1 | P a g e
Appendix B
Working Smarter - Perth City Centre Car Parking Options and Kinnoull
Street Multi-Storey Car Park
1. EXECUTIVE SUMMARY
1.1 The opportunity for Perth and Kinross Council to acquire Kinnoull Street Multi-
Storey Car Park (MSCP) contributes to the overall successful delivery of the
Perth City Integrated Investment Proposal as outlined in the covering report.
1.2 The Pullar House Public Finance Initiative (PFI) Project Agreement referred to
in Appendix A also creates an opportunity for the Council to purchase Kinnoull
Street MSCP at the same time as Pullar House. Pullar House can also be
purchased without the car park.
1.3 If the Council wishes to exercise its right to purchase the car park at market
value, this needs to be intimated to the owners by 10 September 2024.
1.4 This appendix provides detailed information to support recommendations 2a
and 2b in the covering report.
2. KEY INTERDEPENDENCIES
2.1 Key dependencies and future opportunities have been identified whilst
undertaking the required work to implement Council’s decisions around Pullar
House and PH2O. On the basis there is a strong business case for the
purchase of Pullar House and construction of PH2O on the Thimblerow Car
Park site there is a robust case to purchase Kinnoull Street MSCP to release
social, economic and environmental benefits by:
 Facilitating ongoing service delivery: the acquisition of Kinnoull
Street MSCP secures parking infrastructure enhancing accessibility for
essential services, ensuring seamless delivery to the community.
 Supporting the proposed public service hub: the car park will serve
as vital infrastructure for the proposed Public Service Hub within Pullar
House, streamlining operations and improving efficiency.
 Addressing parking needs for PH2O: where PH2O, or another future
development, replaces Thimblerow Car Park, Kinnoull Street MSCP
will offset the loss of related parking facilities, supporting the new
development.
 Rationalising underutilised car parks: MSCPs offer efficient use of
land by offering more spaces on a smaller footprint. The Council taking
control of Kinnoull Street MSCP would present an opportunity to
strategically review existing surface/ street car parks and potentially
free up space for alternative service provision.

Page 2

 Opportunity for asset acquisition: purchasing Kinnoull Street MSCP
at market value presents a unique opportunity to secure an important
city centre asset, with cost projections indicating potential savings and
future profits.
 Enhanced customer experience: acquiring Kinnoull Street MSCP,
would bring parking arrangements there in line with other Council-run
sites, providing a more consistent and customer-friendly experience for
visitors to Perth city centre.
Mobility Strategy and Action Plan
2.2 A Mobility Strategy and Action Plan is currently being developed to enhance
the transport network over the next 15 years. The strategy covers all modes of
transport in Perth and Kinross, aligning with national targets and local
objectives. It also considers car parking and its impact on the city centre.
Currently, these documents have been in consultation following Council
approval in May 2024 and an update will be reported in due course.
2.3 Within the city centre, two specific actions in the Draft Mobility Strategy
highlight future opportunities relating to Kinnoull Street MSCP.
 City Centre Circulation Plan: This action emphasises re-evaluating
parking and road space allocation. Adding another MSCP to the
facilities within the control of the Council supports this by providing
efficient, high-density parking within a smaller footprint, potentially
freeing up surface parking for other uses.
 City Centre Parking Review: This action involves completing a
Strategic policy and related car parking survey to inform future parking
requirements in Perth city centre, providing an opportunity to consider
disposal of under-utilised assets in favour of alternative service
provision.
Purchase of Pullar House – Creation of a Public Sector Hub
2.4 The ongoing work to consider the viability of transforming Pullar House into a
Public Sector Hub has outlined adjacent parking as an essential operational
need for many organisations. However, indications of the number of parking
spaces partners would require suggest that sufficient parking will remain for
general public use.
2.5 If the Council instructs the purchase of Pullar House without Kinnoull Street
MSCP, the Council will lose access to the 85 spaces within the structure that
form part of the current PFI agreement.
2.6 To inform investment decision-making and provide context for the city centre
estate, Ryden Commercial Property Agents and Chartered Surveyors were
instructed to provide a market valuation for Kinnoull Street MSCP. This report
highlighted that a significant proportion of the current model for Kinnoull Street

Page 3

MSCP relies on the Council’s PFI payments, bringing the future viability of the
car park into question without the Council’s contribution and introducing the
risk of:
 a potential derelict building within the Culture Quarter of the city centre
 impact to the economy via the loss of 555 parking spaces
 change in business model with unknown impact on customer
experience and potentially introducing further discrepancies in the
Perth city parking offer.
PH2O – Enabling a Leisure Asset Within the City Centre
2.7 As set out in the covering report and Appendix C, the preferred option for
PH2O is to build at the current Thimblerow Car Park site, with the existing
Perth Leisure Pool (PLP) and Dewars Centre sites being developed for
housing once the new facility opens.
2.8 If this option is approved, Dewars, Glover Street and Thimblerow car parks
would be redeveloped as part of the PH2O project, creating a potential loss of
579 Council/ Live Active Leisure (LAL) operated parking spaces, whilst
bringing an additional annual footfall of 400,000 visitors to the city centre.
2.9 Purchasing and operating Kinnoull Street MSCP would both offset this loss
and provide parking options for leisure centre customers within a five minute
walk/wheel of the proposed PH2O site. Priority for Blue Badge holder parking
on Thimblerow will be incorporated as part of the statutory planning process.
Car Parking Site Current Council-
Owned Parking
Provision
Proposed Council-Owned
Parking Provision
Dewars Centre/
Glover Street
174
200
-
Thimblerow 205 70
Kinnoull Street MSCP - 555
Total: 579 625

Page 4

2.10 Kinnoull Street MSCP is currently operated by a private company and has
complex payment arrangements. As both the largest car park in Perth and the
nearest significant parking asset to the proposed new leisure site and Perth
Art Gallery, Perth Theatre and Perth Concert Hall, there is significant reliance
on this site for customer parking, but with customer experience in the hands of
a third party.
3. ASSET INFORMATION
Kinnoull Street MSCP Information
3.1 Kinnoull Street MSCP is currently owned by Kinnoull House Limited and
leased to the Council, with the parking service delivered via their sub-lease to
Smart Parking Ltd, providing 555 off-street car parking spaces at a similar
tariff to Council-owned city centre car parking costs.
3.2 Kinnoull Street MSCP was constructed in 1999 and is a modern carpark
which is suitable for modern-sized vehicles, with scope for future renovations.
3.3 As part of the PFI Agreement for Pullar House and Kinnoull Street MSCP, the
Council pays a guaranteed minimum sum (unitary charge) for 85 spaces
within the car park together with an indexation adjustment and receive a share
of any profit above a guaranteed minimum sum. This cost is met from the ring
-fenced parking budget.
3.4 At the end of the PFI agreement on 10 September 2025 the Council will lose
use of these 85 spaces and pay no further unitary charge costs.
3.5 The Council’s expenditure for the last four years relating to Kinnoull Street
MSCP is displayed in the table below:
20/21 21/22 22/23 23/24
Unitary
Charge -380,851 -382,075 -389,661 -404,864
Rates -91,006 -92,486 -92,486 -91,074
Water -6,275 -6,387 -6,689 -6,960
Profit share 47,533 49,061 64,111 104,458
Total Paid -430,599 -431,887 -424,725 -398,439
4. PREFERRED OPTION
4.1 Having considered the previously described factors and following SWOT (see
Appendix B1 and Appendix B2), officers are recommending that the Council
purchase Kinnoull Street MSCP.
4.2 Based on the outcome of the future city centre parking review proposed within
the Mobility Strategy, and future Council decision(s), the Council would be in
the position to either:

Page 5

 Own and operate Kinnoull Street MSCP alongside existing car parks
throughout the city centre, or
 Own and operate Kinnoull Street MSCP and, subject to a parking
review, dispose unrequired parking assets in favour of alternative uses
Indicative costs
 Capital investment required: £2.25million
 Annual revenue loan charges for capital borrowing £101,250
 Total revenue investment required (including annual loan charges):
£414,741
4.3 Acquiring Kinnoull Street MSCP eliminates the need to pay the unitary
charge, creating a £380,000 budget saving, which could be repurposed and
bolstered by income to purchase and run the car park without additional
budget requirements:
Projected Annual Income/ Expenditure Indicative Costs (£)
Revenue investment requirement -414,741
Unitary charge budget saving +380,000
Projected partner parking income (should Council instruct
the purchase of Pullar House) +54,600
Projected Kinnoull St MSCP income based on Smart
Parking data (low utilisation) +100,311
Total +120,170
4.4 If Council instructs the future closure of Thimblerow Car Park and Dewars
Centre/Glover Street Car Parks to facilitate the construction of PH2O and
redevelopment of the existing PLP/Dewar’s site into housing, income levels
currently attributed to these assets can be redirected to Kinnoull Street
MSCP:
Potential Future Income Indicative Income (£)
Redirection of Thimblerow car park income £237,000
Property cost savings from releasing
Thimblerow car park £39,257
Redirection of Dewar’s Centre/ Glover Street car
park income - currently paid to LAL £31,000
Property cost savings from releasing Dewar’s
Centre/ Glover Street car park
N/A costs met by LAL
(£12,000)
Total +307,257
4.5 In addition to this, following the proposed parking review, where under-utilised
assets are identified and declared surplus this may provide further savings
and income to Kinnoull Street MSCP.

Page 6

6 | P a g e
Appendix B1 – SWOT relating to not purchasing Kinnoull Street MSCP
Strengths Weaknesses
 No additional capital or revenue
expenditure
 Saving of current PFI unitary charge, rates
and water for asset
 No additional asset or related risks
 The Council currently has 85 spaces within
Kinnoull Street MSCP, if these are relocated
to Canal Street, or local street parking, this
will impact the availability and income within
affected car parks
 Loss of opportunity to purchase more
modern MSCP within the city centre
 Loss of opportunity to support Mobility
Strategy via reducing street parking/ surface
parking in favour of utilising vertical space
within MSCP
 Loss of opportunity to complete Parking
Review to ascertain city centre parking
needs and explore disposal of other car
parks in favour of Housing or alternative
options
 Doesn’t provide infrastructure to facilitate city
centre development projects (PH2O, Pullar
House Public Sector Hub) or cultural
attractions such as Perth Art Gallery, Perth
Museum, Perth Concert Hall and Perth
Theatre.
Opportunities Threats
 If Kinnoull Street MSCP were to close it
would increase utilisation of Council car
parks in the area, increasing income
 Smart Parking’s income level is significantly
supported by the Council’s PFI payment,
removal of this in September 2025 will
significantly impact building income and
attractiveness to operators to continue
running the building - presenting risk of a
vacant site within Perth city’s Culture
Quarter - if the car park owner/ operator
closes Kinnoull Street MSCP there is a loss
of 555 spaces
 For a hypothetical operator to be attracted to
Kinnoull Street, they would need to drive
significant operational cost savings and/or to
meaningfully increase income either through
improving utilisation or raising the parking
charges/tariffs:
o Increasing the cost of parking would
likely drive customers towards
alternative solutions at Council

Page 7

operated surface parking throughout
Perth or grant an advantage to the
only direct competition within Perth,
namely Canal Street MSCP– ergo
potentially unviable for any other
operator presenting risk of a vacant
site within Perth city’s Cultural
Quarter
o Reducing the costs of parking to
increase utilisation would impact
Council-operated car parks as to
remain competitive the Council would
need to reduce costs, impacting
available funding for management,
maintenance and investment in
parking
 Loss of adjacent parking provision to Pullar
House will impact:
o Council service delivery through loss
of efficiencies for staff that only visit
for short times and delay rapid
response
o Public Service Hub ambition as
several key partners have essential
parking needs that would rely on
parking and external storage needs
being met by the car parking operator,
assuming ongoing operation
o Ease of access for Council
employees or customers with
disabilities should the car park not
continue to operate

Page 8

Appendix B2 – SWOT relating to purchasing Kinnoull Street MSCP
Strengths Weaknesses
 Higher MSCP parking volume – would
offer the Council an additional 555
spaces, providing opportunity (post
Parking Survey) to consider disposal/
replacement of other car parks for
alternate purposes in line with Mobility
Strategy and property rationalisation
ambitions:
o Housing
o Greenspaces
o Street improvements/ green
infrastructure
o Connecting services to improve
active travel within centre
 MSCPs offer better utilisation of limited
and restricted city centre space via
vertical use of space – removing on-
street parking through provision of multi-
level parking reduces street congestion
and reduces car parking ground level m²
needs.
 Higher income potential via provision of
additional city centre parking spaces and
removal of competitor
 Existing Kinnoull Street MSCP operating
arrangements have a poor reputation,
impacting public opinion - Council
operation of this site would offer more
consistent customer parking experience
in Perth city centre
 Control of a key site in a strategic
location within Perth city centre’s
Cultural Quarter, serving commuters,
shoppers and residents
 Mitigate risk of vacant car park post-PFI
agreement
 Provides adjacent parking for Council
vehicles and proposed partners
(essential requirement for some)
 Purchase costs and costs of change -
additional capital and revenue
expenditure
 Additional asset and related risks

Page 9

Opportunities Threats
 Opportunity to implement modern
parking system to improve customer
experience and minimise future staffing
requirements
 Future opportunity to add green
infrastructure such as solar panels, EV
charging stations and energy efficient
lighting to support Net Zero ambitions
 Growing urban populations lead to
higher demand for parking –this site
offers suitable central parking for any
future developments within the city
centre
 Removing on-street parking provides
opportunities for street improvements to
provide safer and more attractive active
travel options, reducing the number of
cars in the city centre in line with the
draft Mobility Strategy Action Plan
 Ongoing downturn in city centre footfall
– impacts number of people using car
park and therefore profit/ loss margins
 Expansion and improvement of public
transportation infrastructure may
reduce reliance on personal vehicles,
decreasing the need for parking
o However, excess parking spaces
could be removed from on-street
car parking, providing space for
future alternate use or improved
transport planning options