Perth and Kinross Council
4 September 2024
PERTH CITY INTEGRATED INVESTMENT PROPOSAL
Report by Strategic Lead - Property Services
(Report No. 24/242)
1. PURPOSE
1.1 The purpose of this report is to:
(i) Implement the instructions of Council in relation to:
 the future use of Pullar House in anticipation of the Public Finance
Initiative (PFI) Project Agreement coming to an end in September
2025 (Report 23/268 refers)
 a revised scope for PH2O with options for ice provision (Report 24/19
refers)
 proposals for the future use of Bell’s Sports Centre to be used as the
basis of community engagement (Report 24/151 refers)
(ii) Highlight opportunities that emerge from considering these projects
together which can help to answer some of the challenges set out in the
Perth City Plan (Perth 2040: Our Agenda for Change) (Report 19/360
refers).
(iii) Set out a series of proposals to leverage those opportunities to create
additional public value for residents, visitors and businesses.
2. RECOMMENDATIONS
2.1 It is recommended that the Council:
1(a) Note the content of Appendix A and the associated benefits, risks and
opportunities
1(b) Commit to the creation of a Public Service Hub within Pullar House
1(c) Authorise officers:
(i) to exercise the Council’s right under the terms of the PFI Project
Agreement to purchase Pullar House at market value upon
termination of the lease agreement
(ii) to negotiate “market value” with the landlord based on the valuations
obtained by the parties, failing which to accept the market valuation
as determined by an independent arbiter in accordance with the
Dispute Resolution provisions within the PFI Project Agreement; and
to proceed to purchase at that price

Page 2

1(d) Instruct officers to negotiate and agree lease terms with partners, for
accommodation within Pullar House on an open-book, cost sharing basis
1(e) Approve capital funding of £10m for the Pullar House workstream as set
out in Appendix A
2(a) Note the content of Appendix B and the associated benefits, risks and
opportunities
2(b) Authorise officers:
(i) to exercise the Council’s right under the terms of the PFI Project
Agreement to purchase Kinnoull Street Multi-Storey Car Park
(MSCP) at market value upon termination of the lease agreement
(ii) to negotiate “market value” with the landlord based on the valuations
obtained by the parties, failing which to accept the market valuation
as determined by an independent arbiter in accordance with the
dispute resolution provisions within the PFI Project Agreement; and
to proceed to purchase at that price
3(a) Note the content of Appendix C and the associated benefits, risks and
opportunities
3(b) Approve Thimblerow as the site for the construction of the new PH2O
facility for the approved base case facilities mix.
4(a) Notes the content of Appendix D and the associated benefits, risks and
opportunities associated with integrated investment proposal
4(b) Agree that 250 new social and/or affordable homes should be developed
on the existing Perth Leisure Pool (PLP) site and Dewars Centre site,
upon completion of the PH2O facility
5(a) Notes the content of Appendix E and the associated benefits, risks and
opportunities
5(b) Agree that there is no viable or sustainable business case for the inclusion
of ice in PH2O base case or the Council’s wider sport and leisure offer
6(a) Notes the content of Appendix F and the associated benefits, risks and
opportunities
6(b) Seek the views of the community in relation to the repurposing of Bell’s
Sports Centre for future use as an unheated multi-use sports pitches/
events space

Page 3

3. REPORT STRUCTURE
Section 1: Purpose of report
Section 2: Recommendations
Section 3: Structure
Section 4: Executive Summary
Section 5: Background/ context
Section 6: Integrated Investment Proposal
Section 7: Options for Ice
Section 8: Proposal for future use of Bell’s Sports Centre
Section 9: Financial Implication
Section 10: Conclusion
Appendices
4. EXECUTIVE SUMMARY
4.1 Like all other local authorities, Perth and Kinross Council is operating within an
already stretched, finite financial envelope, with significant challenging savings
targets across all areas. It is vital therefore that, where we are committing capital
investment, we are creative and innovative in our thinking and planning, to
ensure that we drive the greatest possible value from our investment decisions.
The proposals within this report have all been developed within that context.
4.2 In addition, the third edition of the Perth City Plan – Perth 2040: Our Agenda for
Change – endorsed by Council in December 2019 set out a strategy for Good
Growth for Perth city centre. Against a positive and optimistic vision for Perth the
plan recognised eight key challenges which have also been considered in
developing this integrated investment proposal for Perth city centre:
 Climate change
 An ageing population
 The future of work
 The changing role of city centres
 Travel and mobility
 Building new communities
 Being digital
 Striving for social justice
4.3 This report sets out a series of linked proposals, which when taken together
provide an integrated investment plan which creates opportunities which will
work to address several of these challenges, particularly – the changing role of
city centres - as well as aligning to key priorities and principles agreed by Council
in the 2022/23-2027/28 Corporate Plan (Report 22/311) and does so in a
financially sustainable way. The proposals are also in line with the Perth City
Centre Development and Design Framework Consultation Draft submitted for
consideration at this same meeting of Council.

Page 4

4.4 The proposals within this report provide the next steps for a number of previous
instructions of Council taken in late 2023/early 2024:
 to test the viability of establishing a Public Service Hub and developing a
business case for purchasing Pullar House (Report 23/268 refers) as part
of the Working Smarter Project.
 to revise the outline business case in line with the facilities mix for PH2O
approved in January 2024, including undertaking further work on curling
usage and affordability factors (Report 24/19 refers) for the future
provision of leisure and sports facilities in Perth city.
 to bring forward further proposals for Bell’s Sports Centre following Live
Active Leisure’s (LAL) approved request to withdraw services from the
building (Report 24/151 refers)
 The decision by Council to amend the Disposal of Land and Building
Policy to prioritise the delivery of affordable/ social housing provision when
disposing of land or building assets (Report 24/150 refers)
4.5 In looking to implement these decisions several pertinent risks and/or
opportunities have emerged. These are:
 Confirmation that Bell’s Sports Centre now has Category B listed status
 Notification by Scottish Water of planned flood mitigation investment in the
North Inch area in the region of £5m-£6m; proposed works include
enhanced building drainage, upsizing of existing sewers, a new sewage
pumping station, surface water management measures in the car park and
a small bund along North Inch Pathway
 Recent confirmation of the availability of the site at Thimblerow as a
potential option for the location of PH2O
 The opportunity to purchase Kinnoull Street MSCP at market value upon
termination of the current PFI project agreement
 The savings target of £1.9m attached to Pullar House and the
rationalisation of operational properties, which requires to be met
4.6 These changes have created an opportunity to look at all of the proposals in the
round to develop an integrated investment plan which prioritises:
 affordable/ social housing,
 increasing footfall in the city centre through office accommodation, leisure
facilities and an indoor sports pitch/ events space,
 improved customer service experience in a public sector hub,
 bringing consistency to the city centre parking offer to improve customer
satisfaction.
4.7 By considering the complementary nature of these projects, we have an
opportunity to exceed the individual project goals; to mitigate and manage risk
more effectively and ultimately, deliver better value for money in terms of
additional economic, social and environmental benefits.

Page 5

4.8 Detailed information to support each of the recommendations which contribute
to this integrated investment proposals are included in the six appendices, but
can be summarised as:
 Appendix A sets out a robust case for the purchase, by the Council, of
Pullar House at market value when the existing PFI project agreement
comes to an end in September 2025.
 Appendix B shows that there is now a strong commercial case for the
Council to also purchase Kinnoull Street MSCP at market value alongside
Pullar House. This will help ensure the deliverability of the Public Service
Hub and provide additional city centre parking infrastructure. 
 Appendix C presents a comprehensive argument for shifting the preferred
location of the new PH2O to Thimblerow from the originally proposed
existing PLP/ Dewars site.
 Appendix D sets out the additional benefits which can be achieved from
developing PH2O at Thimblerow by creating 250 new affordable and/or
social houses at the existing PLP/ Dewars site.
 Appendix E sets out the costs and options associated with integrated ice
options as instructed. Officers remain of the view that ice provision is not a
commercially viable option for the Council, given the potential benefit to
cost ratio. Accordingly, officers do not recommend including ice provision
as part of Perth’s sport and leisure offer. 
 Appendix F presents a concept for the future use of the now Category B
listed Bell’s Sports Centre as an unheated multi-use sports pitches/ events
space, with a recommendation that this goes out to public consultation.
4.9 Officers are therefore proposing a series of recommendations designed to form a
cohesive integrated investment plan to ensure that we can drive the greatest
possible strategic value from our capital investment decisions and optimise our
property assets within the city centre to better serve our community. These
recommendations can be summarised as follows:
1) Purchase Pullar House at market value
2) Purchase Kinnoull Street MSCP at market value
3) Develop PH2O (base case) on the Thimblerow site
4) Designate the PLP site for affordable and/or social housing (est. 150 units)
upon completion of PH2O
5) Agree that, in terms of the Council’s duty to deliver best value, ice
provision will not be part of its sporting and leisure offer within Perth City
upon completion of PH2O at which point the Dewars Centre site shall be
designated for affordable and/or social housing (est. 100 units)
6) Consult with the community on the future use of Bell’s Sport Centre as an
unheated sport and leisure facility

Page 6

5. BACKGROUND/ CONTEXT
5.1 Following consideration of a report to Council in October 2023 (Report No.
23/268 refers), where the establishment of a Public Service Hub within Pullar
House was agreed in principle, officers were instructed:
 to develop a business case, to include the potential purchase of Pullar
House, in accordance with the Council’s approved Investment Planning
framework, for consideration and decision
 in developing the business case for the public sector hub model, to seek
to achieve the maximum possible level of cost recovery whilst recognising
that other public sector and charity bodies also play a vital role in
delivering positive outcomes for our residents
 to work with the potential partners to realise net zero ambitions for Pullar
House in order to make it a more attractive proposition to potential
partners
5.2 Since then officers have been working with partners to implement the above
into a proposal (the Pullar House “Route A” option for ease of reference).
5.3 In January 2024, Council considered the Transformation Review of Leisure
Assets (Report No. 24/19 refers) which, based on usage data and market
analysis, recommended reducing the scope of the accommodation proposed in
the outline business case to remove leisure water, indoor bowling and ice
provision. This was accepted by Council, given the need to address serious
issues as regards the affordability of the project, subject to ensuring that the
design of the new pool allows for a family friendly leisure swimming offer, with
the further instruction that officers:
(i) undertake further analysis as regards curling usage, market trends and
affordability
(ii) include options for an ice rink component within the final costed PH2O
proposal to be brought back before Council.
5.4 For the purposes of this report the PH2O proposal has been considered in two
component elements (1) the accommodation elements as agreed by Council to
date and (2) the exploration of options for sustainable ice provision as per the
further instruction of Council.
5.5 The agreed elements (referred to as the PH2O “Base Case”) are as follows:
 25m, 8 lane traditional swimming pool including moveable floor (with
family friendly leisure swimming availability)
 Teaching pool
 Fitness gym
 Studios (group, multi-purpose space)
 Sports hall
 Family play activity
5.6 As agreed by Council, the base case accommodation does not include leisure
water provision (flumes, lazy river, wave pool etc).

Page 7

5.7 The assessed options for ice provision, as further requested by Council, are set
out in Section 7 with further details in Appendix E.
5.8 On 15 May 2024, Council agreed (Report 24/19 refers) to LAL withdrawing
delivery of services from Bell’s Sports Centre and relocating health and fitness
activities to the Dewars Centre in the interim, pending completion of the
anticipated PH2O Project.
5.9 In light of the confirmation of Bell’s status as Category B listed building, it was
noted that officers, in liaison with Historic and Environment Scotland (HES),
were exploring potential alternative public service uses for Bell’s. Officers were
therefore instructed to bring forward proposals for the future use of Bell’s to
Council later in 2024, including plans for community engagement on these
further proposals.
6. INTEGRATED INVESTMENT PROPOSAL
6.1 While both the Pullar House and PH2O proposals have the potential to create
additional public value in their own right, once Thimblerow was identified as a
potential site for PH2O the proximity of the two sites highlighted the potential for
a broader integrated city centre investment proposal. Allowing us to harness the
opportunities which each presents to optimise the value of our investment and
deliver on the commitment to Good Growth set out in the most recent update to
the Perth City Plan. Offering a response to the challenges set out in the plan:
 Challenge 1: Climate change – replacing aging buildings with more energy
efficient new builds
 Challenge 3: The future of work – creating circumstances to support Perth
as a resilient, knowledge-based economy by creating a Public Sector Hub
to retain employment in the city centre
 Challenge 4: The changing role of city centres – bringing leisure and sport
into the city centre and developing new affordable housing nearby creates
more reasons for people to choose the city centre as a place to live, shop,
work, learn and meet.
 Challenge 5: Travel and mobility – focussing development alongside
public transport links and creating opportunities for a holistic review of
Perth’s parking offer.
 Challenge 6: Building new communities – answering the need for new
homes.
6.2 The Council’s agreed approach to capital investment is set out in the
Investment Blueprint (Report 21/180 refers) with the viability of proposals
determined on the basis of the HM Treasury’s Green Book “5 Case Model” the
principles of which are set out below:

Page 8

STRATEGIC Is it needed? What is the business rationale for investment
Is it a strategic fit? Will it further our aims and objectives?
ECONOMIC
Does it deliver best value?
Have a range of options been explored?
Is it the best balance of cost, benefits and risks?
COMMERCIAL
Is it commercially viable?
Is there a market?
Can we secure a value for money deal?
FINANCIAL
Is it affordable?
Are the costs and assumptions realistic?
Is the required funding available and supported?
MANAGEMENT
Is it achievable?
Do we have the right resources, systems and processes in
place to deliver?
Once delivered, can it be sustained?
6.3 The details pertinent to the viability of the respective project proposals are set
out in the attached appendices.
6.4 Key risks relate primarily to affordability and/or ongoing operating costs,
particularly given the already agreed savings target attached to Pullar House
and the need to rationalise the operational estate (£1.9million).
6.5 The following sections provide a high-level assessment summary of the
component elements of the integrated investment proposal based on the 5
Case Model approach. It must be borne in mind that depending on what stage
the business cases are at, there will be varying levels of detail available at this
point in time and costs are indicative based on information available to date and
best assumptions.

Page 9

6.6 Route A: Purchase of Pullar House at Market Value
Meets the assessed Council and current partner
requirements for office and records storage
accommodation and to facilitate the co-location of other
interested public partners
Strategic case
(Business
rationale)
Aligns with local and national policy ambitions for more
integrated public service delivery and a single Scottish
Estate
Compared to other options, this is the more cost efficient
and effective mechanism to meet assessed Council
operational need for office/records storage
Economic Case
(Value for money)
Co-location would reduce property costs for interested
public partners
Depressed market for office accommodation equates to
low market value – attractive price for prime city centre
real estate
Genuine interest from key public partners in co-locating
with Council
Opportunity for the future costs of carbon reduction
measures to be shared
Commercial Case
(Viability)
Avoids future additional costs for records storage
Delivers potential revenue saving of £1.9mFinancial case
(Affordability) Delivers potential £1+million saving to public partners
NHS already in situ on interim basis
Minimises disruption to operational service delivery
Management case
(Deliverability)
Commitment from public sector partners at highest level
Market value not yet determined - failure to agree will
result in arbitration
Risks
Costs for renovation are indicative only prior to final
design
Risk Mitigation Market for office accommodation is significantly
diminished
Council and landlord have each shared valuations.
District Valuer has provided valuation that aligns with
Council’s initial valuation
Commercial case can be made based on current market
value assumptions
Economic: Retains control of a prime city centre site
Social: Creation of Public Service Hub – more integrated
and better public service customer experience
Social: Supports hybrid working and cross service/sector
collaboration
Social: Prevents a large city centre property lying
empty/falling derelict
Environmental: shared costs will make future carbon
reduction works more affordable
Economic: increased city centre footfall will support local
economy
Benefits:
Economic: provides a cost effective solution to a live risk
in relation to museum collection storage

Page 10

6.7 Base Case PH2O at Thimblerow
Need to address condition, costs and energy
consumption risks in relation to the existing facilities at
PLP/Dewars
Alignment with corporate priority: Supporting and
promoting physical and mental wellbeing
Alignment with Perth and Kinross Physical Activity and
Sports Strategy 2023-2028 (Report 23/133 refers)
Strategic Case
(Business
Rationale)
Alignment with the Perth City Plan’s answer to challenge
4: the changing role of city centres to broaden the appeal
of Perth city centre so that more people choose it as a
place to live, shop, work, learn and meet.
Following options appraisal – proposal represents the
most cost effective way of delivering the facilities to meet
assessed need and demandEconomic Case
(Value for money) Drives greatest value from available sites within Council
ownership and/or control
Commercial Case
(Viability)
Solution reflects an appropriate level of construction risk
Given the reduced specification (30% reduction in base
case accommodation as compared with original business
case (through removal of leisure water, bowling and ice),
indicative costs are within designated capital budget
envelope for the project
Financial case
(Affordability)
Scope, design and energy efficiencies will reduce annula
revenue operating deficit
Management case
(Deliverability)
Optimal transition: Maintains service provision at PLP and
Dewars throughout duration of PH2O build
Proposal at Strategic Business Case only therefore no
finalised design. Costings are therefore indicative only
Loss of leisure water (flumes etc) – impact on usage/
reputation
Risks
Loss of surface car parking within Council control
Risk Mitigation Purchase of Kinnoull Street MSCP to provide additional
Council-operated car parking
Social: new swimming, sport and leisure facility in prime
city centre location
Social: maintains existing swimming, sport and leisure
provision for build duration
Social: releases PLP and Dewars sites for 250 new
affordable and/or social houses
Economic: local job opportunities for the build
Economic: brings ~400,000 users into the city centre
Benefits
Environmental: Increased energy efficiency/carbon
reduction by design

Page 11

6.8 Purchase of Kinnoull Street Multi Storey Car Park at Market Value
Meets operational requirements of Council and Public
Service Hub partners
Ensures adequate parking infrastructure to support
delivery of the Integrated Investment Proposal
Strategic Case
(Business
Rationale)
Better alignment with Mobility Strategy
Economic Case
(Value for Money)
Cost effective solution to mitigate risk of reduction in
surface car parking at Thimblerow
Competitive purchase price due to depressed market
value
Commercial Case
(Viability)
Ability to offer greater consistency in the Perth city
parking provision providing greater public appeal
Indicative total revenue investment required is not
significantly greater than the current unitary charge costs,
but future revenue costs can be mitigated by income
generation
Financial Case
(Affordability)
Funding would come from Parking Account
Management
Case
(Deliverability)
If Council wish to purchase at market value asset will
transfer at the expiry on the PFI agreement in September
2025
Risk Market value not yet determined, failure to agree will
result in arbitration
Current market value is significantly diminished
Council and landlord have each shared valuations.
District Valuer has provided valuation that aligns with
Council’s initial valuation
Risk Mitigation
Commercial case can be made based on market value
assumptions
Social: supports the creation of the Public Service Hub
(partner requirements)
Social: provides appropriate parking to support PH2O
and city centre
Social/ Environmental: provides opportunities to
rationalise and repurpose underused carparking facilities
Economic: retains commercial control over key parking
resource and supports increased footfall in the city centre
Benefits
Economic: provides additional car park income source

Page 12

6.9 Repurpose PLP and Dewars Site for Housing
Target investment where it is most needed (there are
currently 785 applications, almost a quarter of all
applications on the Common Housing Register,
requesting accommodation in Perth city centre)
Aligns with Council’s corporate priorities in particular –
tackling poverty, climate change and promoting health
and well-being
Strategic Case
(Business
Rationale)
Aligns with recent Council decision to prioritise surplus
land for housing
Economic Case
(Value for Money)
Provides a cost-effective solution to meet assessed
need for affordable and/or social housing within the city
centre
Commercial
Case (Viability)
Land is already within LAL ownership – no title
impediment to transfer or use for housing purposes by
Council /Housing Revenue Account.
Financial Case
(Affordability)
Funding would come from Housing Revenue Account,
Council Tax Reserve Income and Affordable Housing
Grant from the Scottish Government
Management
Case
(Deliverability)
Potential for up to 250 housing units
Risk Housing will not be developed until completion of PH2O
at alternative site. Potential alternative proposals may be
considered in intervening time.
Risk Mitigation Early consideration by Council of planning application
and development of housing proposals soon after LAL
operations move to alternative site.
Social: helps meet unmet demand for social/affordable
housing in Perth city centre
Environmental: Provides energy efficient housing
solutions to meet unmet need
Benefits
Economic: provides housing which is accessible and
affordable to help mitigate the impact of poverty
7. OPTIONS FOR ICE
7.1 Based on:
 a comprehensive assessment of sport and leisure demand and usage in
previous Transformation Review of Leisure Assets;
 further assessment and analysis of data in relation to curling usage,
income, market trends/growth potential
 the required capital and revenue investment required to accommodate ice
provision as part of the PH2O offer; and
 consultation and engagement with local, national and world curling bodies
 duty to deliver best value and to target investment where is most needed/
would deliver the greatest benefit

Page 13

Officers have determined that there is no viable business case to support
the inclusion of ice provision as part of the Council’s PH2O offer, the detail
of which is set out in Appendix E.
7.2 Given the views of the curling community however, the following sets out an
alternative option which, although not recommended by officers, members
may wish to consider exploring further.
Alternative Ice Option: Perth/Scottish and/or World Curling assume full
responsibility for ice provision from the existing Dewars Centre
Aligns with Council Corporate Plan priority: supporting
and promoting physical and mental wellbeing
Strategic
Case
(Business
rationale)
Aligns with Council Corporate Plan priority: Working in
partnership with communities
Economic
Case (Value
for Money)
This option would see curling bodies and/or other third
party(ies) take on lease of Dewars Centre on full
repairing and insuring basis. Council would have no
ongoing financial liability for any element of ice provision
or maintenance and repair of building or plant
Commercial
Case
(Viability)
It would be for curling bodies to determine the
commercial case. They would however have options to
establish a Trust or other similar model enabling them to
leverage funding not available to the Council
Financial
Case
(Affordability)
To support curling bodies with an affordable solution to
operate an ice facility the Council could potentially lease
Dewars to them for a nominal sum
Management
Case
(Deliverability)
No legal impediment to lease arrangement
Lack of appetite from Perth/Scottish and/or World Curling
(and/or any other 3rd party)
Commercial viability based on data re
usage/trends/growth potential etc.
Risk
Failure to maintain building/plant to safe standard
Risk
mitigation
Transfer would be part of planned transition process
towards opening PH2O
Benefits Social: ice provision would be retained in Perth city
centre
Dis-benefits Social: loss of 100 affordable and/or social housing units

Page 14

8. FUTURE USE OF BELL’S SPORTS CENTRE UNHEATED MULTI-USE
SPORTS PITCHES/ EVENTS SPACE
8.1 In agreeing to the formal request by LAL to relocate service provision from
Bell’s Sports Centre to Dewars Centre and in light of the building’s recent
Category B listed status, officers were asked to explore options for future
public alternative use and to bring back proposals, together with plans for how
the community would be engaged on this issue.
on site

Page 15

8.2 Officers have continued to engage with Historic Environment Scotland given the
building’s newly listed status. They have confirmed that it is the original dome of
the structure that is of material architectural significance and not the associated
buildings that have been added over the years.
8.3 This has therefore inspired a concept which puts the original dome at the heart
of the design and repurposes the space to meet the significant unmet need of
community sports clubs and youth groups for outdoor (but covered) sports
pitches or event space.
8.4 As this is not yet a strategic proposal and merely a concept for consideration
and consultation, there is no high-level design, and the indicative costs are a
best estimate based on current costs, assumptions and professional
experience.
8.5 It is suggested that further work be undertaken to firm up costings based on
ongoing condition surveys. If these are broadly in line with indicative costings,
the proposal as a concept be put out to consultation to ascertain the views of
the community but also to seek alternative suggestions which could be
delivered within a similar financial envelope.
Meets an unmet community need for more
synthetic sports pitches 
Retains a much-loved listed building as a
public amenity, showcasing the element which
is of true architectural significance
Strategic Case (Business
Rationale)
Aligns with Council Corporate Plan priority:
supporting and promoting physical and mental
wellbeing
Economic Case (Value for
Money)
Proposed design requires more modest capital
investment and based on available data re
usage and demand, gives higher cost/benefit
ratio than other potential option
Commercial Case (Viability) Opportunity to partner with third party to
leverage funding opportunities which may not
be available to the Council
Financial Case
(Affordability)
Proposed design solution minimises future
revenue costs
Management Case
(Deliverability)
Land is within Council ownership and is leased
to LAL.
Proposal at concept stage so costings are
indicative
Flood risk from sewerage/drainage
infrastructure
Building is Category B Listed
Risk
Long term lease arrangement between LAL
and Perthshire Rugby Football Club
Notification from Scottish Water re planned
flood mitigation investment (£5-£6million) at
North Inch area
Risk Mitigation

Page 16

Continuing dialogue between officers and
Historic Environment Scotland
Ongoing discussion with Perthshire Rugby
Football Club to seek to review current lease
terms
Public consultation on proposal to assess
interest/appetite or identify better alternative
option
Social: helps meet current unmet demand for
sports pitches
Benefits
Economic: retains listed building as a
community amenity
9. FINANCIAL IMPLICATIONS
9.1 Financial implications arising from the recommendations are detailed within the
relevant appendices.
10. CONCLUSION
10.1 Officers consider that the creation of the Public Service Hub within Pullar House
and locating the new PH2O at the site at Thimblerow, when considered as an
integrated programme, delivers significant public value over and above the
merits of each proposal as a standalone investment decision:
 Better customer experience – the creation of a one site leisure facility in
PH2O and a Public Sector Hub offer a better experience for residents and
visitors who can access services conveniently. This is also supported by
both sites being close to public transport links and by bringing Kinnoull
Street Multi Storey Car Park into the same operating model as other
Council-owned parking, making the parking offer more consistent and less
confusing.
 Partnership working opportunities -Co-location with partners and the
third sector within a Public Sector Hub at Pullar House will support multi-
disciplinary collaboration, improving communication and helping to
improve cross-agency working to address complex community needs
more effectively.
 Business boost – increased footfall from staff and customers of the
Public Sector Hub, users of the sport and leisure facilities at PH2O, and
250 new households at the edge of the city centre, will invigorate the local
economy, supporting businesses and helping promote local economic
growth and regeneration.
 Addressing housing need – unlocking 250 affordable and/or social
housing units within Perth city in an area with established amenities and
access.

Page 17

 Environmental benefits – disposing of energy inefficient aging buildings
and investing in new leisure and domestic builds designed for better
energy efficiency aligns to a just transition to net zero.
 Financially sound - given current office accommodation market
conditions, purchasing Pullar House and the adjacent car part at market
value makes commercial sense. It positions the Council and its partners to
leverage cost efficiencies and generate long-term savings, meeting and
potentially exceeding the £1.9million savings target set by the Council. An
integrated PH2O facility at Thimblerow also presents the most cost-
efficient option for delivering the agreed leisure facilities mix, reducing the
current operating deficit and delivering greater energy efficiency 
10.2 The integrated investment proposal presents a unique opportunity to optimise
the public value of our investment decisions to deliver significant additional
social, environmental and economic benefits to our community.
Author
Name Designation Contact Details
Stephen Crawford Strategic Lead, Property
Services
SCrawford@pkc.gov.uk
Lisa Simpson Strategic Lead, Legal and
Governance
LiSimpson@pkc.gov.uk
John Fyfe Principal Officer (Project
Management)
JohnFyfe@pkc.gov.uk
Kirsty Fleming Working Smarter Project
Lead, Property Services
KFleming@pkc.gov.uk
Approved
Name Designation Date
Clare Mailer Director (Strategy, People
and Resources)
28 August 2024