Argyll and Bute Council
Development & Economic Growth   
Delegated Planning Application Report and Report of Handling as required by
Schedule 2 of the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013 relative to applications for Planning Permission or
Planning Permission in Principle 
Reference No: 22/00231/PP
Planning Hierarchy: Local Development 
Applicant: Kilbowie Development Company Ltd 
Proposal: Alterations to Increase Roof Pitch of Dwellinghouses 
Site Address:  1-7 Kilbowie Shore, Gallanach Road, Oban 
DECISION ROUTE 
Local Government Scotland Act 1973 
SUPPLEMENTARY REPORT NO. 1 
(A) INTRODUCTION 
The purpose of this Supplementary Report (SR) is to bring Member’s attention to
two late representations received regarding the proposed development which is
addressed in Section B below.   
(B) FURTHER REPRESENTATION   
Two, further, late representations have been received from Kenneth and Catherine
Campbell, 2 Dungallan Terrace, Gallanach Road, Oban. 
Summary of issues raised: 
 Submitting comments on the details of the report submitted in support of the
application from Base Metal as follows: 
‘The report states that the FTMRG guide for good practice is “a minimum of 3
degrees pitch and between 3 and 5 degrees”.  Therefore, why has a roof pitch of
15 degrees being sought, this is at the very least 3 times what is needed. 
It is noted that the internal gutters are to be replaced to external gutters with the
report stating that “internal gutters are always risky”.  I would like to repeat my
past comments that this is the alleged problem and not the pitch of the roof.   
It is also with great interest that report states that “wind and rain has increased
by 30% in the previous 30 years”.  I am sure this would make no difference to the
pitch of a totally waterproof roof with a proper guttering system.

Page 2

Issue is taken with the comment that “the pleasing aesthetic appearance of the
zinc roof will be more visible from the ground level”.  Is this part of the reason why
the higher pitch is being applied for, to give the building a more “pleasing
aesthetic feel”.  It can only be assumed that the company has never visited the
site and has been promised the work if this planning application is passed.   
Officer Comment: The comments regarding the report are noted, however, the
Planning Authority has to consider the proposal subject of the current planning
application, including the supporting roof report as submitted, it is not for the Planning
Authority to critique the report of a specialist. 
 Noting that, despite rain during a very wet summer, some extremely heavy at
times, there has been no attempt to carry out intermediate work on the roofs at
Kilbowie Shore.  If the water ingress is actually happening, or is as severe as
been advised, surely some attempt would have been made to lessen the
damage. 
Officer Comment:  Whilst this comment is noted, it does not represent a material
planning matter in the consideration of this application. 
 Raising concerns that the proposed rooflights, which are angled towards
Dungallan Terrace, will cause light pollution as some residents of Kilbowie Shore
leave their lights on all night. 
Officer Comment: The existing roofs contain rooflights and it is not considered that
having them at a slightly different angle will result in any significant light pollution. 
 The current buildings are not sitting low in the site, they are obtrusive,
unsympathetic and any further overdevelopment of a steep pitched roof will be in
direct conflict with the original planning approval.  While also at the detriment in
the long term of the visual amenity of the wider natural landscape. 
 It is noted that the visualisations previously submitted in support of the application
have been withdrawn and it is unclear as to whether the photographs submitted
by residents of Dungallan Terrace will still be considered as they clearly
demonstrated the difference between the proposed original plan and the reality
of what was built.   
Officer Comment: As set out in the main Report of Handling before Members, whilst
the overall height of the dwellinghouses will increase as a result of the new hipped
roof, the increase in height, approximately 1.57 metres, is not considered to be so
significant that the overall appearance of the dwellinghouses, or their setting within
the site and wider landscape will be adversely affected. 
Again, as set out in the main Report of Handling before Members, the dwellinghouses
have been built as approved in the previous planning application and associated non-
material amendment for a slight increase in height.   
The above represents a summary of the issues raised in this late representation.  Full
details of the representation is available on the Council’s Public Access System by
clicking on the following link Argyll and Bute - Planning Documents (argyll-
bute.gov.uk)

Page 3

(C) RECOMMENDATION   
That Members note the contents of the late representations and endorse the
recommendation of the Planning Authority that planning permission be granted
subject to the conditions and reasons appended to this Supplementary Report and
the main Report of Handling. 
Author of Report: Fiona Scott Date: 16/08/22 
Reviewing Officer: Tim Williams Date: 16/08/22 
Fergus Murray
Head of Development and Economic Growth

Page 4

CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 22/00231/PP 
1. The development shall be implemented in accordance with the details specified on the
application form dated 03/02/22, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date
Received
Location/Site Plan  100 A  31/03/22
Proposed Roof Plans  101 A  31/03/22
Existing Roof Plans  102  ** 04/02/22
Proposed West Elevations  103  ** 04/02/22
Terrace 1 – South East & North Elevations  104  ** 04/02/22
Terrace 2 – South, East and North
Elevations 
105 A  31/03/22
Terrace 1 – Section AA 106 ** 04/02/22 
Terrace 2 – Section AA 107 ** 04/02/22
Terrace 2 – Section BB 108 ** 04/02/22
Terrace 2 – Section CC 109 ** 
Existing West Elevations Terraces 1&2  110 ** 31/03/22
Roof Report – 3 PAGES    
Report on Design Alterations    07/07/22 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
Note to Applicant: 
 This planning permission will last only for three years from the date of this decision
notice, unless the development has been started within that period [See section
58(1) of the Town and Country Planning (Scotland) Act 1997 (as amended).] 
 In order to comply with Sections 27A(1)  of the Town and Country Planning
(Scotland) Act 1997, prior to works commencing on site it is the responsibility of
the developer to complete and submit the attached ‘Notice of Initiation of
Development’ to the Planning Authority specifying the date on which the
development will start. Failure to comply with this requirement constitutes a breach
of planning control under Section 123(1) of the Act. 
 In order to comply with Section 27B(1) of the Town and Country Planning
(Scotland) Act 1997 it is the responsibility of the developer to submit the attached
‘Notice of Completion’ to the Planning Authority specifying the date upon which the
development was completed. 
Both the Notification of Initiation and Notification of Completion forms referred to
above are available via the following link on the Council’s website: 
https://www.argyll-bute.gov.uk/planning-and-environment/make-planning-
application