Page 1

Argyll and Bute Council
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle
_________________________________________________________________________ 
Reference No:   21/01943/PP
Planning Hierarchy:  Local Application
Applicant:   Mr Paul Rodger
Proposal: Demolition of detached dwellinghouse, erection of 3 detached
dwellinghouses and formation of vehicular access 
Site Address: Peat Knowe, Back Road, Clynder, Helensburgh, Argyll and Bute
G84 0QF
________________________________________________________________________
SUPPLEMENTARY REPORT NO. 2
1.0 INTRODUCTION 
The attention of Members is drawn to the main Report of Handling dated 8th June 2022 that is
currently before them for consideration in respect of the above application and the
Supplementary Report No.1 dated 3rd August 2022, on the main agenda.
At the PPSL meeting on 22nd June, The Council agreed to continue consideration of this
application at their next available meeting in August 2022 and instructed Officers to request
that the Applicant provide by the end of July 2022, an engineering report on the ground
engineering works required to ensure stability of the sloping ground to prevent any slippage
or flooding onto neighbouring properties. 
At the time of the preparation of the Supplementary Report no.1 the requested Civil
Engineering Report had not been received, nor had the agent contacted Officers to an agree
an extended timescale for preparation and submission of the Report. As advised within that
Supplementary Report no.1, Officers contacted the agent requesting an up-date to Members
by means of a Supplementary Report. The agent has since provided up-dates on progress
summarised below.
In addition, further representations have been submitted in relation to the proposed
development subsequent to the June meeting of the PPSL and the preparation of the
Supplementary Report no.1 to the August meeting.
The purpose of the Supplementary Report is to up-date Members with regard to the following:
-
1) The applicants progress and intended deadlines for the submission of a Civil
Engineering Report pursuant to consideration of this item by members at the June
PPSL meeting; and, 
2) Further representations received subsequent to the June PPSL meeting.

Page 2

2.0 SUMMARY OF DEVELOPMENTS 
Up-date by the planning agent with regard to the requested Civil Engineering Report
08.08.2022 – The agent confirmed that his client has instructed an engineer to prepare and
submit the further information requested by the PPSL Committee, however he
advised that a full site investigation is required to confirm the stability of the
ground, and that due to the scale of this work the final report wasn't quite
ready. He confirmed that a desktop study and a soil investigation study has
been carried out by Cowal Design. The Report in respect of these interim
investigations is awaited.
The agent has assured Officers that the preparation of the Civil Engineering
Report (to address the issues raised by the PPSL Committee at the June
meeting) is being progressed as quickly as possible and will be submitted
before the deadline of 26/8/22 at the latest (in order to allow the proposed
development to be fully considered by Members at the September PPSL
Committee.)
12.08.2022: - Pursuant to the above, the agent advised that the applicant is still awaiting the
full soil investigation report from his civil/structural engineering consultant,
Cowal Design, but in the interim has provided an email from his structural
engineer with regard to the stability of the site. This e-mail is reproduced in
full below: -
“In relation to the above site we can confirm that we have
reviewed the proposals, the site topographical survey and have
recently had ground investigation works carried out on the site to
establish the underlying ground conditions and confirm that on
the basis of these conditions with sandy clay across the site
overlying shallow bedrock the site is stable and suitable for the
proposals. 
We will update when the Ground Investigation Report is
received, and when the Civil Engineers have designed the
proposed retaining wall layout”.
Further representations received
The main report to PPSL Committee at the June meeting advised that a total of 20 no.
representations had been received, ‘broken down’ as follows: -
Support     1
Objections  17
Representation   2
Since the June meeting of the PPSL, a further representation has been submitted by a Local
Member, Cllr. Mark Irvine, on behalf of local residents who have raised further issues of
concern. These issues are summarised below: -
11.07.2022  Cllr Mark Irvine – 
 Sightlines

Page 3

It is submitted that the applicant has carried out site clearance
works and modifications to the site (including cutting back a hedge
on adjoin land without permission), as well as seeking to purchase
adjacent land, prior to submission of the application in order to try
to meet Roads Authority guidelines in relation to access design
and sightlines for an access to serve 3 no. dwellinghouses.
Comment: - The consultation response by the Roads Authority
advises that there are no highways objections to the proposed
development subject to a suspensive planning condition requiring
formation of the access with the required visibility splays.
However, planning officers will investigate whether the land
required for the visibility splays are within the applicant’s
ownership/control, or if not whether there is an agreement that
would allow for the visibility splays to be provided and maintained
where they overlap land not owned by the applicant. Officers will
clarify this issue when the application is reported to the PPSL
Committee following receipt and consideration of the Civil
Engineering report. 
Boundaries
 Concerns have been expressed that the site boundaries have
been ‘stretched’ by the felling of trees that were not within the
property boundaries.
Comment:- The planning authority does not have a remit to
arbitrate on land ownership disputes, however, it does have a duty
to ensure that the application submission is competent in relation
to the Town and Country Planning (Scotland) Act 1997 – section
35, and he Town and Country Planning (Development
Management Procedure) (Scotland) Regulations 2013 – Reg. 15
in relation to the land ownership certification submitted as part of
the application forms. On the basis of legislative/regulatory
procedure only, planning officers undertake to request
confirmation of the certification on the application forms that no
person, other than the applicant, was an owner of any part of the
application site (edged red) at the period 21 days prior to the
submission of the application. The response will be reported back
to the PPSL at the first opportunity. 
 Drainage
It is implied that the small watercourse that forms the southern
boundary of the application site (as shown on the application
drawings) has been damaged and become blocked as a result of
the applicant’s activities. It is suggested that any permission that
the planning authority is minded to approve be subject to a
planning condition requiring restoration/repair of this watercourse
and connected to an adequate drain to avoid potential flooding to
neighbouring properties.
Comment: - The Main Report recommends that planning
permission be subject to a suspensive planning condition requiring
submission and approval of full details of a surface water drainage
system (compliant with the principles of SuDS and the CIRIA’s

Page 4

Manual) prior to commencement of any further works on site. It is
expected that such details shall identify any existing blockages of
the watercourse and propose remedial works, and any other
measures required to demonstrate that the proposed drainage
system has adequate capacity to accommodate additional surface
water run-off without resulting in flooding elsewhere. 
Public Access/Footpath
 A submitted extract from Scotland’s Land Information Service (LIS)
suggests that there is a strip of land/footpath that is not within the
property ownership. It is further submitted by local residents that a
cast iron kissing gate has been removed from a position adjacent
to the burn as part of the site clearance, and that this suggests
that there had been some kind of pedestrian footpath along the
strip of land between the burn and the hedge (cleared) that
demarcated the southern boundary of “Peat Knowe”, that at one
time led up to “Cromrach”.
Comment: - The consultation response from ‘Scotways’ advises
that right of way SD13, as recorded in the National Catalogue of
Rights of Way (CROW), crosses or is close to the application site.
As set out in the main report to the June meeting of the PPSL
Committee, it is considered that any potential impact on the
recorded Right of Way SD13 can be satisfactorily mitigated by
planning condition.
The route of the potential footpath along the southern edge of the
site (subject of this representation) is not recorded on the ‘CROW
Map’.
‘Scotways’ additionally point out that there may also be
“Unrecorded Rights of Way” subject to meeting specified criteria;
or subject to “General Rights of Access” created by the Land
Reform (Scotland) Act 2003. Planning Officers will investigate this
issue in discussion with the Council’s Access Manager and advise
Members further at the next available meeting. 
Tree Preservation Orders and Tree Felling
 It is submitted that a local resident made a request to the planning
authority regarding a Tree Preservation Order (TPO) at this site on
July 26th 2021. Now that the trees have been felled there is no
evidence left to prove or disprove that any of the trees would have
been subject to a TPO.
Comment: - It is confirmed that the trees felled on/or adjacent to
the site were not subject to a Tree Preservation Order. 
Traffic and Access
 It is submitted that the local public/private road network is
unsuitable to accommodate the type of HGV construction traffic
required without causing major disruption and damage. It is
suggested that any permission that the planning authority is
minded to approve be subject to a planning condition requiring on-
site provision for unloading of parked construction vehicles and
on-site storage of materials.

Page 5

Comment: - The consultation response from the Roads Authority
indicates that the local public road network has been considered to
have capacity in principle to accommodate any additional traffic
movements generated by the propose development, and that
notwithstanding the width, horizontal alignment, gradients and lack
of footways, that the standard of the access regime is not an over-
riding constraint to the proposal in relation to the nature of traffic
movements generated during the construction phase. However,
any planning permission that is approved may be subject to a
planning condition requiring the submission and approval of an
Access Management Plan for consideration by the planning
authority in consultation with the Roads Authority prior to the
commencement of any further works on site. Any such condition
will form part of a later report to PPSL. 
3.0 RECOMMENDATION 
It is recommended that consideration of this planning application be continued to the
September PPSL Committee to allow the applicant the extended opportunity to prepare and
submit the Civil Engineering Report requested.
Planning officers undertake to carry out any further investigations required in response to
concerns expressed by local residents and to report back to the next available PPSL
Committee. 
Author of Report: Norman Shewan      Date: 15th August 2022
Reviewing Officer: Howard Young             Date: 16th August 2022 
Fergus Murray 
Head of Development and Economic Growth