PKC - GENERAL#
1
2
3
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
Buildings and
Energy
B1 Domestic -
Private
Prepare and then deliver a costed
programme and seek funding to complete
the Local Heat and Energy Efficiency
Strategy (LHEES), as the basis for future
planning and delivery of specific building
level interventions and heat
decarbonisation measures across zones
(e.g. heat networks) in Perth & Kinross.
1. Formal Statutory Proposals from SG.                                      
2. Complete LHEES process.   
3.Identify heat decarbonisation measures
across P&K.
Climate Change
and Zero Waste
T T G Annual report on LHEES to be taken to CC&S
Committee on 10 November. Good progress
was made on key actions:
- Perth Heat Network
- Strategic Energy Partner
- Estate decarbonisation
- Community energy (Scalable cities)
- Public engagement
Buildings and
Energy
B1a Domestic -
Private
Using Scottish Government awarded grant
funding, undertake LHEES pilot project
with consultancy/EST support to further
develop capacity for future LHEES
statutory duties and support ongoing
policy development in this area.
Complete Climate Change
and Zero Waste
N/A N/A Complete Complete - 2023

Page 2

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
4
5
Buildings and
Energy
B2 Domestic -
PKC
Develop and deliver a programme to
ensure all existing Council houses are
brought up to EPC B by 2032                
1.  Target Council housing with EPC Band D
and below by 2026.                                          
2.  External consultants to be appointed to
carry out a high level review of current housing
stock and to identify scope and costs for
meeting EPC B.                             
Housing T T G Report from ARUP has been received and
plans are underway to form a Retrofit Strategy.
Pilot projects - one pilot project is now complete
and we will be reviewing the data being
received from these properties (in use).  The
other pilot project was delayed awaiting funding
approvals from Scottish Enterprise and this has
not yet been received; review underway of use
of building therefore further delays being
encountered whilst agreement is reached. 
The properties that have EPC's of Bands E & F
(we have no Band G properties) have been split
into categories and are being addressed; a
proportion have had measures carried out but
require updated EPC's;  others require a single
measure to achieve a Band D and others
require more than one measure and are being
programmed into the energy efficiency
programme to install the measures required to
upgrade the properties to EPC Band D. 
Working towards Scottish Government deadline
of December 2025.
Buildings and
Energy
B3 Domestic -
PKC
Investigate the potential to deliver new
build exemplar projects using a net zero
approach incorporating other sustainability
measures including potential avenues for
funding and potential to incorporate mixed
use developments.
Review of Design Guide for New Build
affordable housing
Planning and
Development
H M A The design guidance was published in Nov
2023. Potential PKC housing projects are being
considered to deliver new build exemplar
projects using a net zero approach
incorporating other sustainability measures
including potential avenues for funding and
potential to incorporate mixed use
developments with early design development
stages with the Balhousie and Beechgrove
projects.

Page 3

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
6
7
8
9
Buildings and
Energy
B4 Domestic -
PKC
Develop a comprehensive suite of
measures for inclusion in the review of the
Local Housing Strategy to assist our
tenants in meeting the challenges of
climate change mitigation by reducing
energy and water consumption.
Agreement and issue of Energy Guide for
Tenants for 2021
Joint between
Planning and
Development and
Housing
M H G Local Housing Strategy is in place and actions
are ongoing; funding for energy efficiency
advice is available for HRA and non-HRA
streams through SCARF; additional Climate
Change funding has been allocated as an extra
workstream through SCARF to support PKC
residents.  This has resulted in savings for
residents, reductions in carbon emissions and
removed some residents from fuel poverty.
Buildings and
Energy
B5 Domestic -
Private
Work with local Housing Associations to
maximise the number of social rented
homes achieving EPC B by 2032.
Planning and
Development
H H A All RSL new builds and remodelling projects will
achieve EPC rating B or higher.
Buildings and
Energy
B6 & B7 Domestic -
Private
Carry out a comprehensive awareness
raising programme for private landlords of
impending EPC targets and develop
support for private landlords to work
towards the required housing energy
1. Carry out a comprehensive awareness
raising programme, giving private landlords
notice of impending EPC targets and directing
them to the technical advice required, to allow
them to upgrade their properties where
required.     
2. Develop support for private landlords to
work towards the required housing energy
standards where there are issues with the co-
ordination of multi owners.                                                              
3. Monitor likely demand and consider options
for resourcing this service including charging
on a cost recovery basis
Joint between
Housing and
Legal and
Governance
Services
M M R Targeted comms for landlords around ECO4
was sent in June 2025.
Very limited progress - as above, until there is
clarity around the legislation and minimum
standards it will be difficult to progress this item
in a meaningful way
Buildings and
Energy
B8 Domestic -
Private
Introduce a scheme for home energy
efficiency advice, co-designed with
partner organisations, the third sector and
the public (to consider also income
maximisation)
1. Continue to fund SCARF to provide free
home energy advice to P&K residents
2.  Continue to support the work of the HEAT
project, Warm Connections, Citizens Advice
and other organisations providing assistance
to business and residents
3. Develop a one stop shop for home energy
advice (Now action B24)
Joint between
Climate Change
and Zero Waste
and Housing
H H G Ongoing - funding to Scarf has been awarded
since 2022 and is secured until March 2026
from Climate Change funds; Funding is
available from Housing to support the HEAT
project from SCARF until March 2026.
The Council has received InnovateUK funding
to explore the feasibility of developing a One-
Stop-Shop retrofit model to be completed early
2025 (Now action B24)

Page 4

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
10
11
12
13
Buildings and
Energy
B9 Domestic -
Private
Commission research into fuel poverty
and housing conditions in the private
sector, to assess the scale of the problem
and develop an action plan to tackle the
issue.
Complete Planning and
Development
N/A H Complete Aligned to LHEES action to work with Energy
Savings Trust and Corporate Data Team (CDT)
to improve LHEES data incl. fuel poverty data. 
CDT developing brief for evidence publishing
and provision.  This aligns with Action 4.2 of the
LHS confirmed Local House Condition Surveys
were completed for both Council and Private Buildings and
Energy
B10 Domestic -
PKC
Carry out an updated survey programme
(similar to the one being carried out by
Property Services) to refresh
information about the condition of the
Housing non-domestic estate (HRA)
portfolio.
1. Carry out estate surveys as per programme Housing H H A Survey programme still to be progressed; focus
is on domestic retrofit strategy initially as there
have been targets set for the domestic sector
Buildings and
Energy
B11 Non-domestic -
PKC
Develop options, costs and funding
avenues for PKC Estate Portfolios to
reduce greenhouse gas emissions.
Options should include non-direct
emissions heat source and Low and Zero
carbon construction methods such as
Passivhaus/Enerphit for all new build and
major refurbishment projects to achieve
energy efficiency and quality.
1. Comply with updated  building standards.                  
2. Align with SFT - Net zero public buildings
strategy.                      3. Identify a plan to
meet SG domestic and non-domestic targets.
Property/Housing T T A High level options appraisal provided by ARUP
and investigating more detailed pathways to
reach Net Zero
Buildings and
Energy
B12 Non-domestic -
PKC
All non - domestic buildings considered for
refurbishment must have improved energy
efficiency and performance, adopting the
'fabric first' approach by upgrading
building fabric and incorporating non-
direct emissions heat sources measures
as standard to reduce heat demand and
“in use energy” consumption to a level
1. Identify additional resources: staffing and
financial.
2. Initial scope to be identified using
Consultants as part of Phase 1 project.
3. Set specific targets for each building as full
scope of works is identified.
Budget Holders
incl. - Property
Services/Commu
nities/ECS
N/A N/A Complete Complete

Page 5

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
14
15
16
17
Buildings and
Energy
B13 Non-Domestic -
P&K
Develop and invest in local district
heat/communal heat/electricity networks
where viable which use alternative non-
direct emissions heat sources such as
electricity, hydrogen or emerging
technologies. This must also be
considered in conjunction with the
requirements of the LHEES programme,
Heat Networks bill and the Scottish
Governments Heat in Buildings strategy.
1. Identify additional financial and staffing
resources.
2. Initial scope to be identified using LHEES
and Consultants as part of Phase 1 project.                                   
3. Compliance with Scottish Governments
Heat in Buildings strategy.
Communities/Hou
sing/Property
Services.
T T G Study completed for Perth City Centre, next
phase of heat network zoning to be investigated
Utilise potential further funding from the
Strategic Heat Network Unit of the Scottish
Government to build a programme for procuring
a partner to deliver heat networks within a wider
energy system.
Buildings and
Energy
B14 Non-domestic -
PKC
Re-evaluate all existing 'business as
usual' programmes of work which are
currently funded. Where possible re-
prioritise these to ensure that a reduction
in greenhouse gas emissions is the key
driver for each expenditure programme.
Typical reprioritised works to be
considered would be upgrading building
1.To be identified and aligned with annual
expenditure programmes.                             2.
To align with investment blueprint.                                   
3. Reduce annual emissions.
Property Services H H A This is work in progress and is being considered
as part of the current Capital Plan for the
Property estate but subject to budget
availability.
Buildings and
Energy
B15 Non-Domestic -
P&K
Explore and secure alternative property
funding streams to assist the transition to
zero carbon and meet Scottish
Government Climate Change targets.
To identify and secure funding as it becomes
available.
Economy,
Development,
Planning
H M A Secured limited funding in 25/26  as part of
Public Sector heat decarbonisation fund.
Further funding bids to be made in future years
as they become available.  Strategic Energy
Partnership proposal being investigated.
Funding secured from Scottish Government
Heat Network Support Unit and EU Scalable
Cities (Serge/Graham to update).
Note: funding received is still minimal compared Buildings and
Energy
B16 Non-domestic -
PKC
Review the property portfolio and reduce
emissions through a combination of
maximising and optimising the use of
buildings in line with the Corporate Asset
management review and Smarter
Working.
1. Assist with targets for reduction in CO2
emissions by rationalising the estate portfolio.
Property
Services/
Communities/Est
ates
H H G Project for Pitlochry Asset Review  at design
stage; Smarter Working proposals are being
implemented and purchase of Pullar House has
been concluded.  Office Rationalisation is
underway in 2 High Street.

Page 6

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
18
19
20
21
22
Buildings and
Energy
B17 Non-Domestic -
P&K
Develop collaborative and partnership
working with other Public sector bodies
and community planning partners to
achieve net zero by 2045.
1. Capitalise and improve  partnership working
to achieve area wide Net Zero targets.
Property
Services/
Communities
H H A Smarter working and Strategic Energy
Partnership mentioned for previous actions
should allow for collaboration with Private and
Public Sector bodies.  LHEES/LAEP Steering
Board including public sector and community
planning partners  meet regularly to align
actions and investment within the LHEES/LAEP
Shared Delivery Plan
Buildings and
Energy
B18 Non-Domestic -
P&K
Area-wide assessment including the
investigation for future local energy
targets and development of a Local Area
Energy Plan 
1.Identify heat decarbonisation measures
across P&K
Planning and
Development
N/A M Complete Complete -2024
Buildings and
Energy
B19 Non-domestic -
PKC
Investigate water conservation measures
to cost options for a dedicated water
management resource to reduce water
consumption and waste across the estate.
1. Decrease water consumption                            
2. Reduce Scope 3 indirect greenhouse gas
emissions
Property Services H H G This is currently progressing through a Water
Audit of all PKC Non-Domestic buildings. This
exercise is being undertaken by a new member
of PKC staff dedicated to water conservation
and climate change adaptation.
Buildings and
Energy
B21 Non-domestic -
PKC
Replace all Oil fired heating systems with
non- direct emissions heat source,
adopting a fabric first approach to reduce
heat demand. Increase local energy
generation and improve heating control
systems. Increase level of smart metering
for all utilities.
1.To work towards meeting SG non-domestic
targets.                             2. To align with
investment blueprint.                                    3.
Undertake quick wins to reduce, energy
consumption and annual emissions
Property Services T T A Utilising existing internal funding up to 2026/27
to undertake initial Non-Direct Emissions heat
source projects. External SG part funding has
also been secured from Public Sector Heat
Decarbonisation fund in 25/26 for one of these
projects.  Further funding streams to be
explored to undertake further work.
Buildings and
Energy
B22 Non-domestic -
PKC
Work with energy and utility suppliers to
share ideas, discuss future solutions and
partnership working in relation to energy
supply and resilience.
1.Decrease Energy consumption and
emissions for PKC and wider P&K.                                                                     
Property Services H H G Currently working collaboratively across PKC
teams to engage with SSEN and also with the
wider Private sector through LHEES/LAEP and
PIN notice for Strategic Energy Partnership.
LHEES LAEP evidence published on Local
Energy Net Zero Accelerator (LENZA) SSEN
platform to assist with low carbon project siting
and wider strategic investment planning aligned
to grid investment plans. Engaging as part of
the Local Energy and Policy Infrastructure
Group on RESP.

Page 7

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
23
24
25
26
27
28
Buildings and
Energy
B23 Non-Domestic -
PKC
Undertake statutory duty in relation to
public sector Non-Domestic buildings and
the compilation of Building Assessment
Reports (BAR) in accordance with Heat
Network Regulations.
To be aligned with heat network zoning and
identify suitability of buildings for future
connection to district heating network as part
of estate wide decarbonisation planning.
Property Services H H A This action is currently in early stages of
development due to the reporting template still
being discussed with SG.  SG have not yet
agreed on the template to be used.
Buildings and
Energy
B24/E26
(moved
from
Engage
ment &
Educatio
n)
Domestic -
Private
Create and deliver a One-stop-shop for
Retrofit in P&K
1. Complete Innovate UK Pathfinders project
2. Identify and appraise methods for running a
one-stop-shop
3. Engage with P&K businesses to assess if fit
for purpose
4. Create ready to invest business plan
5. Secure financing and deliver
6. Explore expansion of in-person climate
change advice centres
Climate Change
and Zero Waste
H H G Innovate UK Phase 2 project completed. Model
for OSS created and ready for start-up and
market testing. £80k of partial seed funding
secured from Climate Change budget.
Buildings and
Energy
B25 Non-domestic -
PKC
Develop rural heat networks at sites
beneficial to our domestic and non-
domestic estates
1. Complete 8-10 feasibility studies into rural
heat networks
2. Explore funding options with HNSU and
other sources
Property Services H N/A New New action for Year 5 - At F&R2 in October
2025, Members agree to allocate £100k to this
element to explore the feasibility of 8-10 rural
heat networks
Buildings and
Energy
B27 Non-domestic -
PKC
Develop a programme of sites under PKC
for renewable energy generation
1. Consolidate the findings for the PKC estate
work already undertaken
2. Investigate the potential installation of
renewable energy at city centre car parks
3.  Investigate the potential for additional
renewable energy locations (e.g. at waste
sites)
Property Services H N/A New New action for Year 5
Business and
Industry
B&I 1 Data &
Strategic
targeting
Collate key info and carbon targeted
reduction plans from key employers and
industry bodies
Information from 100 top employers and main
energy users collated
Economy,
Development,
Planning
M H A Each member of the Business Growth team to
be assigned a selection of businesses from the
top 100 with renewed focus on gathering
information through one on one in-person
meetings with representatives from firms in the
Top 100
Business and
Industry
B&I 2 Engagement,
Empowerment
and
Awareness
Identify and meet with key
employers/businesses
Meetings with SSE, Aviva, Stagecoach and
Highland Spring organised
Economy,
Development,
Planning
N/A N/A Complete

Page 8

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
29
30
31
32
33
34
35
Business and
Industry
B&I 3 Strategic
Actions
Agree with key employers/businesses for
them to lead/champion the Race to Zero
campaign at local level
Agreement reached with SSE, Aviva,
Stagecoach, Highland Spring
Economy,
Development,
Planning
N/A N/A Complete
Business and
Industry
B&I 4 Data &
Strategic
targeting
Agree with key employers/businesses the
key activities, locations or sectors to
target to reduce carbon emissions and
achieve a just transition.
Agreement on developing joint actions on
Transport/travel, asset energy efficiency and
skills/job opportunities
Economy,
Development,
Planning
N/A N/A Complete
Business and
Industry
B&I 5 Strategic
Actions
Promote with key
employers/businesses/business
organisations the Race to Zero campaign
to local businesses.
Joint announcement at Zero emission Tour
Bus 26.10.21 event
Economy,
Development,
Planning
N/A N/A Complete
Business and
Industry
B&I 6 Strategic
Actions
Promote advice and support tools for
SMEs to reduce carbon, access
funding/green finance, ensure business
continuity and measure progress.
Signposting to sectoral and representative
bodies' online resources and advice in place
Economy,
Development,
Planning
H H R There is a need to compile and display
resources to support SMEs to reduce carbon.
Many businesses will require sector specific
resources which will be promoted alongside a
general code of practice
Business and
Industry
B&I 7 Strategic
Actions
Develop public/private learning business
forums via existing partnerships/networks
Tay Cities Clean Growth Cluster launched Economy,
Development,
Planning
M M G Tay Cities Clean Growth Initiative progressing
well and as expected, continuing to grow and
develop professional networks that disseminate
public/ private professional knowledge
Business and
Industry
B&I 8 Skills/jobs Identify and address skills shortage in
business and industry including with key
employers and their supply chain
Joint initiatives agreed Economy,
Development,
Planning
H H G Work continuing to support the development of
skills required for key industries through
engagement with Perth UHI and support of
initiatives such as the development of a Clean
Technology and Biodiversity Skills Centre
(CTABS) at Binn Eco Park
Business and
Industry
B&I 9 Skills/Jobs Identify and promote green job
opportunities in business and industry
including with key employers and their
supply chain
Joint initiatives agreed Economy,
Development,
Planning
H H A Engagement with key employers ongoing
through the Top 100 programme and the
Business and Industry working group including
detailed updates on hiring numbers and
graduate programmes from major employers
such as SSE. Work needs done to expand
acquisition of job opportunities data and
complete it's mapping

Page 9

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
36
37
38
39
40
41
Business and
Industry
B&I 10 Strategic
Actions
Develop joint strategic projects to
decarbonise Transport (goods and
people) with key employers in close
liaison with the Transport Group
Joint initiatives agreed Economy,
Development,
Planning
N/A N/A G On-going as part of wider B&I business
engagement work, but initial projects around
hydrogen identified
Business and
Industry
B&I 11 Strategic
Actions
Develop joint strategic projects to
decarbonise fixed and mobile asset
including energy efficiency with key
employers in close liaison with the
Building and Energy Group
Joint initiatives agreed Economy,
Development,
Planning
N/A N/A Complete Agreed via LHEES/LAEP strategy setting
process approved via Council in 2023
Business and
Industry
B&I 12 Strategic
Actions
Identify and share business continuity
plans with key employers in close liaison
with the Resilience Group
Plans identified and liaison established Economy,
Development,
Planning
M M A Engagement questions for sessions with Top
100 businesses to be updated to include
questions on resilience to acquire data on key
employer's resilience plans
Business and
Industry
B&I 13 Measuring
performance
Agree with key employers/businesses key
indicators and measure performance
Indicators agreed Economy,
Development,
Planning
M M A Data collection ongoing. Survey was sent out to
large employers and energy users to establish
which had carbon reduction plans and whilst
response was limited, some key employers,
such as Stagecoach, have provided detailed
carbon reduction plans. More carbon reduction
plans are required for proper analysis to be
conducted. Collection of carbon reduction plans
to be expanded trough Top 100 engagement
Business and
Industry
B&I 14 Strategic
Actions
Develop Perth West and Perth Eco-
Innovation Park as a national net zero
exemplar for decarbonisation of transport
and energy
1. Business Case agreed
2. Commercial marketing commenced
Economy,
Development,
Planning
T T G Project progressing well. Key milestones on
legal agreements, ground investigation works,
and masterplan development have been
reached with commercial marketing to begin in
near future
Business and
Industry
B&I 15 Strategic
Actions
Transport: Facilitate Business
engagement in the development of PK
Mobility Strategy, Wider EV infrastructure,
Active Travel & Public Transport Dunkeld
Corridor
Effective engagement Economy,
Development,
Planning
N/A N/A Complete

Page 10

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
42
43
44
45
Business and
Industry
B&I 16a Strategic
Actions
Energy: Facilitate business engagement
in the development of the Local Heat and
Energy Efficiency Strategy (LHEES),
Smart Local Energy Systems (SLES) and
Smart Local Energy Programme
Effective engagement Economy,
Development,
Planning
H H G On-going - Business engagement and
involvement as part of the LAEP working
groups.
Clear and continue success with the
development of this programme including the
deployment of insulation and solar panels,
engagement with SSE, alignment with mobility
strategy, finalisation of EV infrastructure
strategy
Business and
Industry
B&I 16b Strategic
Actions
Develop carbon reduction actions on large
emitters employment/industrial sites in
Perth City - Inveralmond/North Muirton
Priorities and actions agreed Economy,
Development,
Planning
H H A Contact made and support provided to
Businesses at Inveralmond such as provision of
a Green Capital grant to support
decarbonisation at Innes & Gunn and
engagement with SSE through the B&I working
group. SSEE have provided information on their
energy use and CO2 emissions as well as their
carbon reduction plan but more work needs to
be done to provide the same level of support to
all businesses at the site
Business and
Industry
B&I 17 Strategic
Actions
Ensure that P&K benefits from gigabit
capable broadband (fibre and mobile
connectivity) across its entire area to
improve business competitiveness and as
a method of reducing CO2 emissions and
the need to travel
Proportion of premises connected. Target 60%
connected with gigabit capable broadband by
26/27
Economy,
Development,
Planning
M N/A New Expansion of broadband continues to roll out on
track with 56.34% of premises connected with
Gigabit capable broadband as of 23.10.25.
Recent expansion of satellite based internet to
rural areas may accelerate the rollout
Climate
Resilience
R1 Resilient
organisations
Build organisational capacity around
climate adaptation and mainstream it into
project development, procurement and
delivery processes
1. Embed climate adaptation into asset
management plans
2. Review Procurement Contract Management
Strategies through a resilience lens.
3. Compile library of procurement examples
(e.g. CTLR) for other teams to use
Climate Change
and Zero Waste
H H G Progress was made in this area - demonstrated
by both our Scotland Adapts Capability Score
and our Adaptation Score for the CCAT.
Climate adaptation is included in the carbon
literacy training and online induction module for
staff.

Page 11

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
46
47
48
49
50
51
Climate
Resilience
R2 Resilient
organisations
Continue to work with Tayside Local
Resilience Partnership to implement local
risk reductions measures and develop
contingency plans
Ongoing. Up to date generic and specific
contingency                plans are in place for
the risks presented by climate change and
groups are encouraged to build climate
change in to thinking.
SPP and P H H G Ongoing action -  up to date generic and
specific contingency plans are in place for the
risks presented by climate change and groups
are encouraged to build climate change in to
thinking.  3 new risks have been added this Climate
Resilience
R4 Resilient
organisations
Review the Scottish Snap Adaptation
Programme 3  (SNAP3) (2025-29) when
published and identify appropriate local
actions
1. Get involved in consultation process for
SCCAP3.
2. Review SCCAP3 once published.
3. Develop plan of PKC appropriate actions.
Climate Change
and Zero Waste
M H G Actions from SNAP3 have been incorporated
into the CCAP - developing a regional
adaptation partnership (R34) was one of the key
duties
Climate
Resilience
R6 Resilient
organisations
Undertake a strategic climate change risk
and opportunity assessment for Perth and
Kinross Council Area
CCROA Complete
Risk assessment shared and communicated
Climate Change
and Zero Waste
N/A N/A Complete Completed and published on PKClimateAction
in 2023
Climate
Resilience
R8 Resilient
infrastructure
Develop and implement green solutions
for protecting open space and core paths
to protect from flooding and erosion
1. Training programme for PKC
staff/consultant to help on projects
2. Develop list of potential projects.
3. Engage with SEPA and flooding team.
Community
Greenspace
M M A Long term programme responding to site or
infrastructure issues as the arise e.g. detailing
to prevent damage to paths or bridges from
flooding. The ranger worked with the local path
group n Comrie to obtain funding, employ an
engineer and implement a willow based green
solution to the burn erosion which was in danger
of undermining the path. 
Climate
Resilience
R9 Resilient
infrastructure
Explore the potential for green-blue
infrastructure for Perth, working in
strategic partnership with Scottish Water.
1. Develop structure of potential partnership.
2. Undertake concept study.      
Flooding Team L L R This is a work area led by Scottish Water, but
discussions are underway to explore the
potential of a strategic workgroup to cover the
PKC / Angus / Fife / Dundee City areas.
Also involves Planning by way of considerations
under their relevant Legislation.
Climate
Resilience
R11 Resilient
infrastructure
Develop updated roads development
guide to resolve conflicts with adoption
criteria for SUDS with roads maintenance
requirements as well as providing wider
resilience benefits (e.g. shading and
biodiversity corridors and protection)
1 Review what current conflicts are in terms of
SUDS features which could be supported if
designed appropriately + review roads
development guide (prepare as streets design
guidance) and define design standards for
these features
Planning and
Development
H H R Review of draft ongoing (autumn 2025) but
limited progress due to staff turnover.

Page 12

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
52
53
54
55
Climate
Resilience
R12 Resilient
infrastructure
Develop and implement scour protection
programme for key Council assets
1. Undertake scour risk assessments across
P&K bridge stock to inform scour mitigation
works
2. CGS - identify sites and structures at risk of
scour and develop an appropriate action plan
Structures Team T T G The Structures Team's scour assessment
programme is ongoing, with several high-priority
road bridge scour mitigation schemes now
identified. These have been added to the
already substantial backlog of works facing the
team.
In particular, the team has received an
allocation of PKC Council Climate Funding 
£250,000 towards scour mitigation and fish
passage improvement works at Blairgowrie
Bridge.
Climate
Resilience
R15 Resilient
ecosystems
Undertake research review into native tree
and flora and fauna species and how they
adapt to the changing climate and develop
programme of necessary actions -
Complete Planning and
Development
N/A N/A Complete
Climate
Resilience
R19 Resilient and
empowered
communities
Develop and build a public awareness
campaign promoting the behavioural
changes identified in the SCCAP2
1. Campaign developed                                    
2. Implementation and M&E of impact
Climate Change
and Zero Waste
N/A N/A Complete
Climate
Resilience
R20 Resilient and
empowered
communities
Continue to support and develop
Communities Resilience Forums and
other community groups and support them
to develop proactive preventative
measures
1. Continue to Support CRFs
2.  Build capacity with groups around
preventative behaviours (e.g. Greenspace
groups, CRF)
3.  Work with community biodiversity groups
on projects that jointly address the nature
emergency and build climate resilience
4. Explore the potential for developing a PFR
household and community scheme
Communities T T G Number of community resilience groups has
grown to 63
Gave out £220k grant funding and £80k
equipment
•Meeting with Blairgowrie and Rattray CC - they
now installed a River Track early warning
system put on the Rattray burn and looking for
other Grant Funding to source Boxwall Flood
Barriers. Perth Community Flood Aid were
granted £20k from Full Council Budget
mentions monies and this will be drawn down
over the financial year 25/26. To purchase
equipment to protect the Craigie area of Perth,
due to increase surface water flooding
resilience.
•Working on a Vulnerable persons register   -
flooding, power outage, need to evacuate a
street, etc

Page 13

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
56
57
Climate
Resilience
R21 Resilient and
empowered
communities
Promote natural flood management and
work with riparian landowners and
communities on addressing climate
change and implementing actions of new
catchment management plans
1. Local place plans use these as a tool to
work with communities on climate impacts
2. Work with landowners through the Leven
LENs programme
3. Engagement by flooding team with key
landowners
Planning and
development
H H A The Council is working on the Blairgowrie NFM
scheme.  Wider land owner engagement is
planned by the Flooding Team when staff
capacity allows.
Through the Leven LENS programme the
Council is helping to leverage farmers to take
action.  Through our NRF funding, we are
assisting local landowners to take action.
Looking to support this more widely through the
Nature Based Solutions strand of Climate
Ready Tayside
Climate
Resilience
R23 Flood risk
management
Use planning system to avoid an increase
in flood risk
1. Provide flood risk advice on proposed
development through planning process (on-
going)
2. Consider need/potential for BS to input at
planning application stage regarding flood
resilient materials and constructions methods.
3. Review and revise the planning advice and
application negotiation process to ensure
SUDS schemes are delivering  multi-functional
benefit (increase in Planning/Flooding Team
resources required for this).
Flooding Team H H A Strategic Flood Risk Assessment for LDP3
published February 2025, online SFRA map
also published. Evidence Report submitted to
Gatecheck March 2025, returned for
resubmission due to insufficient evidence July
2025.
To deliver 1 and 2. an increase in Flooding
Team resources required for this.  An
alternative to deliver 2 is to change the building
standards.
For 3. This could be best addressed through
new street design guidance, due to concerns re
maintenance. This guidance has been drafted
by the Council's transport planning team and
will be circulated internally for input.

Page 14

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
58
59
60
61
62
63
Climate
Resilience
R24 Flood risk
management
Continued delivery of Flood Risk
Management Cycle 1 Projects and
commence Cycle 2 projects.
1. Individual projects to deliver actions are
listed in actions R24a-j
2. Completion of statutory reporting - every 3
years (Dec 2025)
Flooding Team T T A Comrie Flood Scheme has commenced
construction, expected to complete October
2026.
South Kinross Scheme Local Authority Hearing
scheduled for Autumn / Winter 2025.
Uncertainty remains around SG funding,
including Cycle 1 and deferred funding for Cycle
2 Schemes.
Several new studies commencing throughout
2025.
Flood resilience projects - Flood resilience fund Climate
Resilience
R24a Flood risk
management
Implement Flood Protection Schemes
(FRM Cycle 2)
Flooding Team H H G Awaiting on outcome of Scottish Govt/COSLA
funding review group.
Climate
Resilience
R24b Flood risk
management
Implement the Comrie Flood Protection
Scheme
Flooding Team H H G Construction commenced in Oct 2024 until
autumn 2026.
To date, much of the sheet piling works have
been completed with final finishes being
applied.
Climate
Resilience
R24c Flood risk
management
Implement the Milnathort (Surface Water)
Flood Protection Scheme
Flooding Team H H G Currently in outline design; delays experienced
due to general project pressures, major flooding
over last few years. Project to conclude end
2026.
Climate
Resilience
R24d Flood risk
management
Implement the South Kinross Flood
Protection Scheme
Flooding Team H H G Currently in outline design; delays experienced
due to general project pressures and objection
process,   major flooding over last few years.
Climate
Resilience
R24e Flood risk
management
Implement the Scone (Annaty Burn) Flood
Protection Scheme
Flooding Team H H A Consultant appointed in 2024. Currently in
outline design; delays experienced due to
general project pressures, major flooding over
last few years. Scottish Government enforced
pause on project introduced delay to
programme.

Page 15

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
64
65
66
67
68
69
70
Climate
Resilience
R24f Flood risk
management
Implement the Bridgend Flood Protection
Works
Flooding Team H H A Detailed design been completed. Awaiting on
outcome of Scottish Govt/COSLA funding
review group. Potential restart of project in late
2026.
Climate
Resilience
R24g Flood risk
management
Complete On-going Flood Studies - FRM
Cycle 1
Flooding Team H H A On-going. Staff at full complement means some
previously paused projects have restarted. Still
some uncertainty over FRM funding from
Scottish Government / CoSLA.
Climate
Resilience
R24h Flood risk
management
Undertake Surface Water Management
Plans - FRM Cycle 1
Flooding Team H H A On-going. Staff at full complement means some
previously paused projects have restarted.
Perth SWMP concluding end 2025, Scone
SWMP underway. Still some uncertainty over
FRM funding from Scottish Government /
CoSLA.
Climate
Resilience
R24i Flood risk
management
Undertake Flood Studies - FRM Cycle 2 Flooding Team H H A On-going. Staff at full complement means some
previously paused projects have restarted.
Bridge of Earn at tender stage. Luncarty, Blair
Atholl, Methven to follow as per cycle timeline.
Still some uncertainty over FRM funding from
Scottish Government / CoSLA.
Climate
Resilience
R24j Flood risk
management
Undertake Surface Water Management
Plans - FRM Cycle 2
Flooding Team H H A On-going. Staff at full complement means some
previously paused projects have restarted.
Bridge of Earn SWMP and Comrie SWMP
underway. Aberfeldy SWMP due to commence
mid 2026. Still some uncertainty over FRM
funding from Scottish Government / CoSLA.
Climate
Resilience
R25 Flood risk
management
Bodies of Water - Inspection, Assessment
and Clearance & Repair Works
Flooding Team H H G 2 permanent Watercourse Inspectors
undertaking programme of inspections.
Climate
Resilience
R26 Flood risk
management
Review climate change impacts on
existing flood protection schemes
To be set closer to action implementation Flooding Team N/A N/A G FRM Cycle 3 (post 2028)

Page 16

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
71
72
73
74
75
Climate
Resilience
R27 Flood risk
management
Address reduced input of Scottish
Government, SEPA and Scottish Water to
the flood risk management planning
process (due to Covid, SEPA cyber-
attack, issues with funding, issues with
legislation, etc)
Flooding Team M M A Raised a future agenda item for the FRM Lead
Authority Forum.
Climate
Resilience
R28 Flood risk
management
Surface water management - seek
increased collaboration from Scottish
Water; address separate funding
mechanisms; seek improvements in
legislation.
Flooding Team H H A Repeatedly raised with the Scottish
Government. Scottish Govt to initiate SAIFF
PMG who will in turn set up a SAIFF T&F Group
for surface water management. Also being
discussed with Scottish Water as part of Perth
Catchment Group. Also raised at SCOTS FRM
Group. Ultimately the legislation and funding
arrangements will have to be amended to make
progress. Monthly meetings now taking place
with ScW to improve collaboration.
Climate
Resilience
R29 Flood risk
management
Address funding gap for intermediate size
flooding projects (greater than annual
revenue budget but smaller than formal
flood schemes)
Flooding Team M H A Paper will be required to go before Strategic
Lead but generally speaking no resources
available at present.
Climate
Resilience
R30 Flood risk
management
Increased incidences of flooding - support
emergency response to flooding and
recovery efforts; emergency works and
additional projects (and address impact on
delivery of Local FRM Plans), consider
setting up Property Flood Resilience grant
fund.
Flooding Team H H A No resources to progress. Barebones of a
Property Flood Resilience fund proposal to
allow residents to apply for a grant are
available. This is subject to outcome of
ScG/CoSLA review of flood scheme funding
arrangements as they may start a nation wide
grant system in line with the National Flood
Resilience Strategy (2024).
Climate
Resilience
R33 Resilient
ecosystems
Develop and deliver proactive resilience
programme to address ash dieback and
storm damage
1. Finalise Ash Dieback Plan Community
Greenspace
H M G Policy now in place and two officers recruited.
Survey of Ash Dieback underway with survey of
Maintained Open Spaces Complete

Page 17

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
76
77
78
Climate
Resilience
R34 -
New
Resilient
organisations
Develop the Tayside Adapts Partnership
together with Dundee and Angus Councils
1. Undertake community scoping workshops
(Autumn '24)
2. Develop scope and business case for
partnership (March '25)
3. Launch partnership with 5-year plan
Climate Change
and Zero Waste
H H G Climate Ready Tayside
(https://climatereadytayside.org.uk/ ) in
partnership with Dundee and Angus Council's
was launched in March 2024.  £51k of funding
from the Scottish Government was secured to
help deliver Year 1 Activities.
Three regional working groups have been
formed:
-  Communication and engagement
- Nature based solutions
- Community Resilience
Climate
Resilience
R35 Resilient
infrastructure
Develop and implement a land slip risk
screening programme for Perth and
Kinross's infrastructure and greenspaces
•Draft and share landslip risk/inventory log with
suggested guidance on risk definitions 
(Structures Team) - done
•Based upon existing knowledge, CGS & RMP
(and Flooding?) populate and keep up to date
the above inventory, accessible to CGS, RMP,
Flooding and Structures teams - ongoing
•RMP & CGS liaise with Structures to arrange
& attend initial inspections as required -
ongoing.
•Relevant teams to meet and agree actions to
address identified high-risk landslips including
raising budget / resource pressures via asset
management reporting etc.  - pending
Structures Team H H G Progress Update 24/09/25
Initial landslip risk inspections have
commenced, although progress has been
slower than anticipated. This is primarily due to
competing demands from high-priority projects
across the Structures team, as well as dense
summer vegetation limiting access to inspection
sites. However, no major issues have been
identified to date. The Structures team
continues to prioritise these inspections and
aims to complete them at the earliest
opportunity.
Climate
Resilience
R36 -
New
Resilient and
empowered
communities
Development of a property flood resilience
scheme
1. Secure funding for the scheme
2. Develop and deliver pilot scheme
3. Review impact and future benefit of scheme
Flooding Team H N/A New New action proposed for Year 5

Page 18

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
79
80
81
Climate
Resilience
R37
(Formerl
y T27)
Resilient
infrastructure
Roads maintenance to adapt to climate
change
Road
Maintenance
Partnership
H M A We have installed gates to prevent motorists
driving into deep floodwater on the A923,B954
and #U100 adjacent to the River Isla as the
incidences of major flooding on these roads has
increased significantly during recent years.
Specifying warm mix asphalts for use in road
resurfacing , specifying re use of as much
reclaimed asphalt on site as possible in lieu of
disposal and replacement with new quarried
products.
Engagement &
Education
E1 General
engagement
Develop and  maintain public engagement 
mechanisms (platforms to launch and
communicate messaging)
1. Develop and deliver annual climate change
engagement plan
2. Create social media platforms
3. Create a dedicated landing page for climate
change engagement activities and
consultations
4. Obtain licence to host events at Civic Hall
5. Host biannual Climate Change themed
community markets
Engagement and
education working
group
H H G Social media engagement continues to grow,
with Facebook and Instagram showing
increased interaction from younger audiences
and strong performance from visual content.
Twitter (X) is currently not utilised due to cost
and limited analytics access, allowing focus on
more impactful platforms. 
Successful Energy Event  hosted in the Civic
Hall- 20th September - This replaced the yearly
nature market for 2025.      
Currently Main council page being utilised to
host consultations such as our Circular
Economy Consultation (Sept-Oct 2025)
Engagement &
Education
E2 General
engagement
Develop and launch comprehensive
Climate Change website
Four months after the launch the key
milestones are:
Climate Change
and Zero Waste
N/A N/A Complete Website launched in 2022

Page 19

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
82
83
84
85
Engagement &
Education
E3 General
engagement
Develop and support Perth and Kinross
Climate Change Commission and Climate
Hub
1. PKCCC creating a website - due to launch
2024 (PKC are the contract owner)
2. Launch of Climate Connect Perth & Kinross
Now runs
autonomously but
with support from
Climate Team
H H G Climate Connect P&K (Scot Gov funded
Climate Hub) launched in  April, creating a
network for groups, businesses and individuals
taking climate action. CC&SD Team sit on
board.
Climate commission has been rebranded as
Shift and just completed their recruitment
process. New website is also live -
https://www.shift.scot/  Successful applicants
will be onboarded within the next few weeks
Engagement &
Education
E4 Council
Elected
Members and
Staff
Refresh Member induction process to
include Carbon Literacy
1. CLT to be rolled out to current elected
members
2. CLT included in formal new member training
from 2027
Member services H H G 70% members trained. 5 member have declined
attending. CLT training will be introduced into
members induction from the new cycle starting
2027
Engagement &
Education
E5 Council
Elected
Members and
Staff
Develop annual programme for staff
training and engagement
1. Run regular Carbon Literacy training for all
staff
2. Develop internal climate change resources
hub for staff
3. Expand the PKC Staff Climate Cafe
Engagement and
education working
group
H H G Carbon Literacy Training condensed to be
delivered over 5hrs. 79 staff attended CLT
including 20 x Elected Members, 29 x SLF and
30 x Officers/Team Leaders with a further 40 x
staff booked on courses before end of
November 2025.
Eric refreshed with updated signposting for
support.
Climate Cafe Teams chat has 71 participants
with monthly events hosted both online and in
person.
Engagement &
Education
E6 Council
Elected
Members and
Staff
Develop internal climate change
resources hub for staff
Complete Climate Change
and Zero Waste
N/A N/A Complete Completed in 2022

Page 20

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
86
87
Engagement &
Education
E7 Schools and
young people
Develop engagement plan and platforms
for young people
1. Develop engagement plan and platforms for
young people
2. Ensure climate change is embedded in
school curriculum
3. Ensure school community are informed and
engaged to support climate positive operations
e.g. using recycling bins correctly, reducing
energy consumption, supporting active travel,
etc
4. Youth Climate Conference
5. Explore and enhance connections between
culture and education. Coordinate with
Engagement and
education working
group
H H G Youth Climate Conference 2024 was attended
by all but 1 PKC school (Bertha Park).
Glenalmond College attended for the first year.
Successful change in format to having a theme
of green skills. 2025 YCC scheduled to take
place 25 Nov with theme of Innovation.
Teachers and non teaching school staff now
included in Schools Sub Group which has
improved communications.
Engagement &
Education
E9 Schools and
young people
Review school operations and practices to
ensure our schools lead by example
1. Roll out of school recycling scheme to
include waste reduction and reuse best
practice
2. Introducing behaviour changes to reduce
energy consumption including adoption of
holiday close down procedures
3. Review and implement updated travel plans
for every school
4. Creating a place for nature and growing on
school site(s)
Climate change
working groups
T T G Energy-The team supported holiday switch-off
with poster reminders and energy audits to
reduce energy waste. Baseload monitoring
helped identify equipment left on during
evenings and weekends, with comparisons to
previous years.
Biodiversity: small number of BeeWild Reports
prepared with proposed 67x schools engaged in
2026 with more BeeWild Reports and Pollinator
Stepping Stone projects rolled out via TBP and
PKC Greenspace. 
Schools Recycling project started at Bertha
Park and cluster primaries. New internal
containers bought and installed. Container
framework created to speed up process and
provide consistency of material across schools.

Page 21

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
88
89
Engagement &
Education
E13 Residents Deliver community and householder
education and engagement
1. Implement thematic specific engagement as
outlined in the Buildings, Transport, Land Use,
Waste and  Resilience Road Maps
2. Establish regular update and engagement
sessions for community groups
3. Mapping and sharing of community groups
involved in climate action
4. Provide support on the corporate PKC cost-
of-living campaign
5. Send out monthly newsletter to subscribers
6. Deliver information at public events (in
person)
7. Provide support via Climate Action Hub
overview panel
Engagement and
education working
group
T T G We continue to keep the PK Climate Action
webpages up to date with relevant thematic
content. We’ve also adopted webinars as a
public-facing engagement tool, When planning
communications such as our upcoming LAEP
comms strategy we take all these thematic
areas into consideration
We actively engage with community groups by
attending meetings such as the Climate
Connect Board, and other local forums. These
sessions help maintain two-way communication
and ensure community voices are reflected in
our work.
Our community group mapping is currently
under review and being updated to reflect new Engagement &
Education
E23 Council Staff
Deliver sector specific business
engagement and resources
1. Produce an Events Sustainability Policy
2. Develop a plan for engagement with
businesses across PKC
3. Create dedicated webpages for business
community
Climate Change
and Zero Waste
H L A A draft Events Sustainability Policy is currently
being developed and is scheduled to come to
committee in May '26. The policy will provide
practical guidance for embedding circular and
low-carbon practices into event planning and
delivery across PKC and partner-led events.
Business engagement approaches are being
actively tested, including new routes such as
utilising the Commercial Waste Team’s
business networks to share messaging and
promote participation.
The business and community sections of the
PK Climate Action website are currently under
review. Updates will improve clarity,
accessibility, and relevance, with plans to
include refreshed content, practical guidance,
and case studies.

Page 22

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
90
91
92
93
94
Engagement &
Education
E28 Community
groups and
organisations
Delivery of the Green Living Fund
Participatory Budgetary Project
The fund exercise aimed to work towards two
of our Corporate Plan priorities – tackling
poverty and tackling climate change and
supporting sustainable places.
We plan to follow the journey of each project
and promote via the PK Climate Action
website - under community stories
Communities H H G The Green Living Fund 2025/26 is currently
being delivered, with applications open from 22
August to 3 October 2025. A full
communications campaign is underway,
including press releases, social media posts,
posters in public venues, and two public
webinars scheduled.
To build momentum and showcase impact, we
have filmed previous successful applicants and
will share their stories across PKC channels
and the PK Climate Action website under
“Community Stories.” Community voting will run
from 27 October to 14 November, with results
announced in late November and funding
disbursed from 8 December 2025.
Engagement &
Education
E29
(formally
B20)
Schools and
young people
Review ECO school certification and
status
1. Increase the number of Green Flag schools
2. Support the creation of groups/ platforms to
enable Green Flag achievement
3. Integrate Learning for Sustainability into
curriculum
4. Create culture change in schools to
encourage school-led climate action
Education &
Children's
Services
H H A Formally B20
Two additional schools added green flags taking
total to 29 PKC schools. Above average % of
schools compared to other authorities.
Ambition to improve this from ECS. New focus
on new projects looking at energy, recycling and
transport.(travel plans and bikeability) and
biodiversity projects
Governance G1 Accountability Produce annual progress report and
action plan updates
Progress throughout the year monitored by the
Climate Change and Sustainability Group
Climate Change
and Zero Waste
H H G Live action plan updated and statutory and
voluntary reported completed for 2025
Governance G2 Accountability Mainstream climate change into
committee procedures and council
operations
Review Mechanisms for ensuring
accountability for senior management and for
the Chief Executive to be actively involved in
the  annual review process
Policy and
Governance
Group
T T G From January 2026, completion of the Impact
and Value Assessment Toolkit which includes
Climate Change Screening has been required
for all committee reports.
Governance G4 Accountability Increase visibility of the executive's team
commitment to Climate Action
Organise for the Chief Executive, Strategic
Lead and Leader to do a PKTV focus on
climate change  (Nov -24)
Legal &
Governance
M M G Climate focused PKTV in November 2024,
additional  promotion at events by other senior
staff

Page 23

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
95
96
97
98
99
100
101
Governance G5 Accountability Establish the Climate Emergency as bi-
annual agenda item for the SLT  meetings
Bi-annual attendance at SLT Communities H H G Climate Change went to SLT on 31.07.2025
with an intention to go early again early in 2026
Governance G6 Business and
performance
management
Embed climate change into annual
business planning process
1. Engagement and reporting as part of the
Council's annual performance report
2. Engagement with business partners about
climate change
Performance
Team
H H A By virtue of climate change being a corporate
priority it is embedded as a strategic priority in
annual reporting, risk and improvement
processes.
Governance G7 Business and
performance
management
Measure and develop action plan for our
Scope 3 carbon footprint
CO2A Analysis completed
Engage with the SSN network on the approach
for embedding additional Scope 3 reporting
requirements into the PBCCDR
Engage with Tayside Pension Providers about
Climate Change
and Zero Waste
M H G This year we measured our Scope 3 emissions
from data (IT) services for the first time. The
Council employed a water officer who will look
at managing and reducing water consumption
and leakage across the PKC estate.
Main Scope 3 emissions sector is procurement Governance G8 Business and
performance
management
Ensure climate change considerations are
embedded at the outset of and during the
life cycle of strategic planning process.
1. Development of Strategic Planning and
Performance Framework
Performance H H A New Strategic Planning and Performance
Framework to go to ELT in November 2025 with
potential dissemination December onwards,
which as a strategic priority includes climate
change a key consideration of the framework.
Governance G9 Business and
performance
management
Integrate Climate Change Priority and
KPIs in the Strategic Base Performance
Module in line with Corporate Plan. Link
CC data in performance module to
Service Risk Register Module
Performance M H A Climate change is now using PK Performs, with
KPI data inputted.
Governance G10 Business and
performance
management
Develop tool for whole life carbon decision
making
1. Initial focus on whole life costing as a proxy
1a. Undertake audit of current WLC
methodology used by different Council
services
1b. Develop central guidance for adoption  (as
appropriate)
2. Explore with the Scottish Climate
Information Service data and approaches for
carbon decision making
Property H H R Following departure of the previous lead for this
action, a new lead for the action was agreed in
September 2025, with progress over 25/26
Governance G11 Decision
making
Redevelop and rebrand the IAT as a multi-
purpose Value and Impact Report to
replace Appendix in Committee Report,
Contract Strategy, Budget screening
Awareness raising with staff about the tool and
ensuring compliance
Develop monitoring procedure
Legal
&Governance/Cli
mate Change
M H G New electronic IVA created and mandated for
all Committee reports

Page 24

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
102
103
104
105
106
107
Governance G12 Decision
making
Identifying a climate change champion in
each Service or key Team
1. Identify thematic leads from across the
Council
2. Identify leads for other key service areas
including Education, Procurement, Health and
Social Care, Finance
Legal
&Governance/Cli
mate Change
H H G Cross-service thematic leads have been
identified (e.g.. Transport, Energy, Waste, etc).
New lead for education has been appointed -
lead for HSCP still required
Governance G13 Finance Develop Cumulative Climate Impact
Assessment of Budget to be taken to
CC&S Committee
1. Template development
2. Embedding into annual budget processes
Finance Team H H R Basic climate screening process introduced in
2023 budget, template for wider budget
screening developed in 2023,  but not
implemented. For 2026/27 agreed to use a
revised combined template for climate change
and equalities
Governance G14 Finance Reduce unnecessary end of year IT
purchasing though December 31 spend
ban
Complete Finance Team N/A N/A Complete
Governance G15 Finance Develop detailed costed route map with
targets to enable decision making and
funding actions identified
1. Develop emissions targets for reducing
business travel
2. Develop emissions targets for reducing
power in data centres
3. Pull data from key strategies and plans
completed in 2024 into central model
4. Build central model in Climate View
Climate Change
and Zero Waste
H H A Decision taken to pause action until greater
clarity on  revised sectoral targets to be
published in the new Scottish Climate Change
Action Plan in March 2026.
Governance G16 People Values and behaviour – embed Climate
Change into HR job families and include
Climate Change in leadership
competencies
1. Embed climate change into corporate job
profiles
2. Internal comms campaign
3. Explore options for School staff
HR H H G In addition to Council job families, a review this
year found that NTC (education) found that
national job descriptions considered a climate
requirements.
All staff, except senior officers now have climate
change included in their job description and this
is something that will be explored further next
year
Governance G17 People Share and make visible CC priorities (e.g.
values) Offer and promote CC E-learning
module and carbon literacy training
Ongoing through internal comms channels Climate Change
and Zero Waste
M H G Promoted to all new staff
Decision was made by Corporate L&D to
remove climate change as mandatory e-
learning module.

Page 25

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
108
109
110
111
112
113
Governance G18 People Roll out Carbon literacy across all staff
and elected members
1. Hold monthly carbon literacy training
sessions available to all staff
2. Organise Carbon Literacy for Managers
targeted at the Corporate Leadership Forum
Climate Change
and Zero Waste
H H G Over 70% of elected members now trained and
over 50% of SLT due to be trained by
December 2026
Governance G20 Sustainable
Procurement
Build capacity of procurement and
contract management staff around
ensuring climate change is appropriately
considered in procurement and delivery
processes
1. Full team to undertake Carbon Literacy
Training
2. Undertake sustainable procurement
capability assessment of the wider Corporate
Procurement Group (key procurers across
Council services)
3. Undertake specialist sustainable
procurement training (Schedule for May 2026)
Procurement
Team
H H A Carbon Literacy training completed by full team.
Governance G21 Sustainable
Procurement
Undertake a review of Council
procurement with respect to climate and
environmental considerations
Complete Procurement
Team
N/A N/A Complete Sustainable procurement Strategy published
June 2024.
Governance G22 Sustainable
Procurement
Develop category strategies for high
emission categories that consider climate
change
Repeat Flexible Framework Assessment
Toolkit (Nov 24)  and use prioritisation fool to
develop target categories
Procurement
Team
T T A Sessions planned for undertaking Prioritisation
Tool to assess risks and opportunities for
identified categories. Q4 25/26 to Q1 26/27.
Governance G23 Sustainable
Procurement
Develop standard specifications and
tender questions for climate change
1. Compile library of relevant tender questions
already used by category
2. Review forward contract planner and identify
top 10 contracts for influence and engage
Procurement
Team
H H A Questions included in some tenders to start
building library of questions suitable for specific
categories.
Governance G24 Sustainable
Procurement
Undertake a supplier review to identify key
Tier 1 suppliers and engage with Tier 1
suppliers about what they are doing
(green credentials)
1. Undertake a review of Tier 1 suppliers to
determine which suppliers PKC has supply
chain influence with
2. Identify top 20 suppliers for engagement
Procurement
Team
H H R No resources to progress.

Page 26

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
114
115
116
Governance G25 Sustainable
Procurement
Investigate how we can consolidate
spending to reduce number of deliveries
Explore whether an RSS hold can be put in Procurement
Team
H M A This was explored in 2024 with the main
barriers identified as lack of storage and
devolved purchasing. There was a paper written
on creating a central purchasing team, however
the cost of this would be significant.  PECOS
will be phased out in probably around 18 to 24
months so it was deemed not efficient to spend
resources developing this hold function, but is
something to explore as part of the Council's
migration to the new system. 
Governance G26 Sustainable
Procurement
Develop new procurement strategy that
includes climate change
Complete Procurement
Team
N/A N/A Complete Approved at Full Council 26th June 2024.
Land use L1 Enhance
landscape
scale
sequestration.
Work with Perthshire Nature Connections
Partnership to identify and develop
landscape scale pilot projects with
partners.
1. Work with JHI to identify the carbon
sequestration potential of 3 key areas across
Perth and Kinross (peatlands, forestry and
trees, and agricultural land).                                 
2. Develop a Pilot Project in Highland
Perthshire with partners (Perthshire Nature
Connections Partnership) for potential wider
roll out. Set targets, identify partners and
measures.                                                               
3. Explore options to work with partners to
create a monitoring strategy for peatland
restoration to understand benefits in local
context and encourage local landowner
participation. 
4.Project Delivery
Planning and
Development
L H A In early 2025,PNCP supported PKC with
engagement activities linked to Nature
Networks development, helping to shape
strategic connectivity planning across the
region. The River Almond Headwaters Project is
no longer a focus, and work on pilot
methodologies for developer contributions has
paused. PNCP’s Conservation Officer is due to
retire in November 2025, and recruitment is
underway to ensure continuity of partnership
coordination and delivery. Officer has made an
Expression of Interest to NatureScot for NRF
Species Rich Grassland – project development
award which was accepted is now applying to
get funding for the full project development.
Continued support to Nature Connections
Partnership P&K, climate Connect P&K and the
Nature-based Solutions workstream of Climate
Ready Tayside. Nature Connections
Partnership P&K Gathering 19th Nov in Perth

Page 27

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
117
118
Land use L2 Involving
young people
in our climate
response.
Work with Education & Children's Service
to develop and implement educational
programmes for schools, to maximise the
potential for carbon sequestration, and
biodiversity protection and enhancement
across our school estate, and to raise
awareness.                                            
1. Produce Climate Change Programme for
Learning in conjunction with Schools and
pupils including creation of a ‘How To’ sheet
covering issues of where to plant, 
maintenance etc.                                         
2. Approval of Learning Programme.                                 
3. Identify locations to roll out programme in
phases?                 4. Identification of a
'Climate Champion' in each school? (Staff and
pupils)
Education &
Children's
Services
H M G Discussions are under way to roll out several
School BeeWild Pollinator projects over the
winter/next spring.
Three school ponds have been included in the
Ponds for Puddocks (NRF) project -one to
restore, one to create, another to enhance.
Land use L3 Increase tree
and woodland
cover.
Review existing policies on trees,
consolidate and update to develop a
comprehensive Tree Planting Strategy
which reflects and upscales our
commitment to delivering on the
Climate Change and Net Zero
1.Develop a Tree Strategy (native trees) for
PKC parks and maintained open spaces;    
a) Review existing policies on trees,
consolidate and update to develop a
comprehensive Tree Planting Strategy which
reflects and upscales our commitment to
delivering on the Climate Change and Net
Zero agenda. 
b) Investigate planting our 92 parks (38
hectares) with native trees that will capture
greater tonnes of carbon dioxide each year.
c) Investigate increasing the overall coverage
of woodland in maintained open space from
current level of 22% (220 hectares) that will
capture increased tonnes of carbon dioxide
each year and reduce emissions of grass
mowing machinery. 
d) Explore the creation of ‘Climate Parks’ to
become carbon stores and more resilient to a
changing climate.
e) Redevelop part of the Westbank site to form
a nursery to supply trees, shrubs and
Community
Greenspace
H H A Tree Planting Strategy going to Feb CC&S
Committee.
It is the policy for approach to planting trees.
This includes what to plant where, site
conditions, standards to apply, tree sizes for
different locations. The strategy to role this out
depends on resources. This work also ties in
with the tree management and ash dieback
strategies which are already published.
Ongoing Treeconomics work into Urban Tree
Planting Opportunities (including in
Greenspaces) due to be completed in
December 2025

Page 28

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
119
120
121
Land use L4 Adapting our
approach.  
Develop a strategy to ensure sub-fleet
machinery are net zero compatible and
implement replacement programme for
net zero compliant machinery.
1. Audit of existing assets, including carbon
credentials (if available).                                           
2. Identification of procurement checklist to
inform any replacement purchases.
Direct Services M H A We have purchased and trialling Pellenc battery
machinery after an unsuccessful trial of Stihl
machinery which showed itself to be
underpowered. Initial feedback is promising but
the trial will be for at least 2 years before
conclusive. However, this machinery is almost
double the cost of the Stihl, and multiple times
more expensive that petrol machinery.
Land use L5 & L20 Halting
biodiversity
loss. 
Improving our
open spaces.
Develop and trial a policy on use of
pesticides and chemicals, including a
review of Pitch Strategy in respect of the
use and potential reduction in chemical
usage.
1. Review of existing practice and identification
of alternatives (including SWOT analysis of
alternative solutions).                                   
2. Identify current baseline figure of pesticide
use (type and volume).                                       
3. Develop and implement an updated policy
on use of pesticides in P&K.
Community
Greenspace
H H                    A We continue to reduce the amount of chemical
weedkiller in tandem with the implementation of
bio areas. A majority of our remaining spraying
is within cemeteries and hard standing paths.
Given Year 3 of the bio area introduction
involves cemeteries we anticipate further
reduction in chemical use. Currently there is no
viable alternative to weedkilling on hard
surfaces. However, we are looking into
improving street weed usage and outcomes.
Land use L6 Reducing
emissions
linked to
maintenance. 
Protecting and
enhancing
habitats and
species.
Improving our
open spaces.
Review existing grounds maintenance
policies and prepare a strategy for site
upgrades - to reduce emissions and
enhance sustainability and biodiversity.
Incorporate a review of grassland
management policy to reduce wildflower
meadows maintenance.
Review of current policy landscape, including
an audit of existing PKC policies and
identification of gaps/ required updates.                                             
Review grounds maintenance activities and
operations undertaken.                                          
Community
Greenspace
H H A Wildflower and bulb planting planned, tree
planting about to start, end of season cuts
underway. Projects underway with planting –
Westbank wonder mix being issued.
As part of review of grow wild, looking into cut
and lift machinery for new sites, among other
actions for biodiversity and climate. Lots of
mapping sessions have taken place where
complaints / concerns have been made with
officers on site with changes being made. E.g.
sites like Kettins where we have worked with
communities to turn things around and change
the narrative and outcome on grow wild.
2x new biodiversity initiatives and grow wild
officers, and grow wild assistant officer are in

Page 29

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
122
123
Land use L7 & L19 Adapting our
approach. 
Protecting and
enhancing
habitats and
species.
Improving our
open spaces.
Phased programme of enhancement to
all major Council parks and greenspace
– including exploring the use of natural
resources in playscapes through the
review of the Council’s approach to play
areas, and investigating ways to enhance
biodiversity, increase tree planting, and
reduce non-native species during Site
Management Plans.
1. Review of current sites when upgrades are
undertaken.                               
2. Monitor use of sustainable equipment and
products.              3. Environmental Impact
Assessment to be undertaken as part of the
design process.  
4. Review current Play Strategy 
5.Seek approval from SMT/ Committee as
required. 
6. Implement changes
Community
Greenspace
M H A All projects implemented through the
Community Greenspace Capital Programme
incorporate elements and design principles
which deliver on these strategic activities e.g.
Bridge of Earn Victory Park and Comrie Legion
Park upgrades.  Review of arrangements for
play equipment manufacture, installation and
maintenance underway to assess use of local
and more sustainable materials.
Land use L9 Halting
biodiversity
loss.
Protecting and
enhancing
habitats and
species.
Accelerate delivery of Tayside LBAP -
Work across services to maximise
opportunities for the Council to achieve
actions set out in the Tayside Local
Biodiversity Action Plan 2016-26.
1. Review Tayside LBAP projects being
delivered and any gaps.                                    
2. Review LBAP to identify list of priority
actions for delivery and by whom.                                             
3. Identify a series of implementation projects.
4, In Year 5 develop next iteration of the LBAP
Community
Greenspace
T T A Biodiversity officer has been updating the PKC
reports and confirms that more actions are
progressing than before. Doubled green actions
from 21 to 42% from last year. PKC committed
to 249 actions in LBAP. Only regressed on 3
actions. Most positive progress was made in
Woodland, Urban and Farmland ecosystems.
Such positive progress has been achieved due
to several reasons, mainly NRF from Scottish
Government, Planning and Development
Management, the Bio Ambassador Group and
additional Bio Officers and funding for
Greenspace. The impact of this progress is on
the ground actions (51% of actions) raised
awareness (31%) and enabling action (17%).
Considering finding funding to reprint the
“Incorporating Biodiversity into Local Services”
handbook.

Page 30

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
124
125
Land use L10 Halting
biodiversity
loss.
Protecting and
enhancing
habitats and
species.
Biodiversity Villages, Neighbourhoods and
Towns Initiative - Work with local
communities and Tayside Biodiversity
Partnership to develop Biodiversity Action
Plans, supporting both biodiversity and
climate change mitigation and adaptation.
1. Identify locations for further roll out of the
Biodiversity Villages Project and work with
those communities to promote benefits and
opportunities and support delivery.                                               
2. Review and reflect on success of project to
date and identify any opportunities for
improvement/ alternative approaches.
Greenspace T T G The project is continuing: still working with
existing communities. A community biodiversity
mapping session took place in September for
Inchture to become a Biodiversity Village and a
number of projects are already being set up.
There is interest in Abernyte following suit.
The Caring for Biodiversity Project is creating
advisory reports and on-the-ground
improvements (primarily for pollinators but also
swifts, bats) for c15 care homes, sheltered
housing units and hospital (Murray Royal).
Working closely with greenspace team and new
officers to take action forward.
Land use L11 &
L14
Reducing
emissions to
meet net zero
targets.
Review existing planning policy framework
and prepare a suite of enhanced policies
for inclusion in LDP3.  Consider as part of
the review any potential policy
amendments to help the planning system
better support the implementation of
carbon reduction measures. Develop
advice and guidance if appropriate.  Links
to NPF4 when published late 2022
1. Review of existing planning policies, powers
and identification of enforcement case studies. 
Identify strength of content and whether there
are clashes between policy themes in either
messages or through implementation.  Include
case studies.                       
2.Explore whether planning agreements could
be used to secure biodiversity actions in all
new developments.                    
3. Explore whether compensatory planting and
carbon offsetting/ accreditation can be used.            
4.Update policies where required.                         
5.Develop advice note and checklist for
applicants to be approved by Council to allow
for stronger future enforcement response and
a consistent approach to implementation. 
Planning and
Development
T T A Development Plans Team has reviewed LDP2
policies against NPF4 national policy suite to
identify which policies have been superseded
by NPF4, which are in conformity with but
provide a local response, and where there is
conflict.  Workshops have been held with
Development Management. LDP3 Evidence
Report has been returned due to insufficient
evidence linked to Education data.  Revised
Evidence Report going to Council on 10
December 2025 and to be submitted to DPEA
by end of year.
Preparation on individual policy/ topic areas
continues, alongside SEA work. Aim is to hold
community/ place-based discussions related to
LDP3 Spatial Strategy throughout January to
end March 2026, with Key Stakeholder
engagement taking place throughout January to
end April 2026.

Page 31

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
126
127
128
Land use L13 Reducing
emissions to
meet net zero
targets.
Development proposals (including
retrofit proposals) to demonstrate they
are minimising lifecycle GHG
emissions as far as possible, in line with
NPF4 and other emerging national policy
(draft Heat in Buildings Strategy, LHEES).
1. Develop advice note and checklist for
applicants.                                                 
2. Consult on documents.                            
3. Council Approval.                                    
4. Implementation of advice note via DM
process.                                                     
5. Incorporation into LDP3.
Planning and
Development
H M R To be considered in development of LDP3
during Year 5
Land use L15 Halting
biodiversity
loss.
Protecting and
enhancing
habitats and
species.
Progress Tayside Biodiversity
Partnership's Action to enhance
business parks and industrial estates -
Work in conjunction with local businesses
to seek funding and produce Biodiversity
Action Plans, supporting biodiversity
enhancement, and climate change
mitigation and adaption measures, within
existing employment areas. Not limited to
protection and enhancement of
biodiversity, but also encouraging active
travel, provision/signposting to energy
audits, EV advice. 
1. Review of a suite of business parks and
industrial estates across P&K, together with
mapping (especially utilities/active travel/
biodiversity potential).
2. Proposals for biodiversity enhancement
(tree/hedge planting, verge/grassland
management for specific species - butterflies,
birds, bats).                                             3.
Proposals for energy audits, active travel, etc
across chosen sites.                                           
4. Working with businesses to integrate private
business-owned land and PKC-owned land
practices to create demonstration sites of
good practice.
Greenspace M M R The ‘Biodiversity Challenge, South Kinross
Industrial Estates’ report – which includes
raingardens - has now been published (by Dr
Brian D’Arcy) and actions from this are being
considered.
There is still a willingness to continue the larger
project when capacity and funding allow.
Land use L16 Progress a "What's Going On?" mapping
project
Complete Planning and
Development
N/A N/A Complete Completed in Year 1 of the Plan

Page 32

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
129
130
Land use L17 &
R32
Increase tree
and woodland
cover.
Protecting and
enhancing
habitats and
species.
Nature Restoration Fund - Manage the
Council's allocation from the Nature
Restoration Fund and deliver key projects
1.  Award annual allocation Climate Change
and Zero Waste
H H G For the first time, the council has received both
revenue and capital funding through the Nature
Restoration Fund, significantly expanding the
scope of deliverable projects. The total funding
awarded for 2025 is £278k with additional
underspend funding from previous years still
available to allocate.
A total of 22 projects have been awarded
funding this year. These projects continue to
support a wide range of nature-based solutions,
including:
-Restoring riparian habitats
-Creating green corridors
-Enhancing urban greenspaces. We currently
have around £45k of underspend still to commit
to projects. The remaining spend is planned for
invasive non-native species projects, Leven
LENS, and drainage pond restoration.
Land use L18 Halting
biodiversity
loss. 
Protecting and
enhancing
habitats and
species. 
Peatland
restoration and
enhancement.
Identify and protect sensitive areas
(including LNCS) from development for
biodiversity resilience, providing
connectivity and ensuring planting is not
counterproductive.
1. Identify and protect sensitive areas
(including LNCS) from development for
biodiversity resilience, providing connectivity
and ensuring planting is not counterproductive.
2. Identify which of these sites (especially
peatland) would benefit from
restoration/enhancement and provide support/
incentive for landowners to do so.
Planning and
Development
H H A LNCS progressing well, all Geodiversity Sites
have been surveyed and assessed. All
biodiversity sites have been surveyed, with a
handful of follow up habitat surveys to be
completed by end of 2025. Biodiversity
assessments with expert panel progressing well
(50%) with aim to be complete by end of year.
Consultation with landowners, and draft
guidance will follow in 2026 by officer subject to
resourcing. Public consultation and committee
will follow.
Several local biodiversity sites have been

Page 33

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
131
132
Land use L22
(new)
Halting
biodiversity
loss.
Protecting and
enhancing
habitats and
species.
Identify and develop Nature Networks for
Perth & Kinross
1. Preliminary mapping
2. Public consultation and engagement
3. Finalised map formed
4. Climate change land restoration officer to
work with partners and landowners to create
nature networks
Planning and
Development
H N/A A Nature Network public engagement undertaken
in March and April 2025 to find other nature-rich
sites to include in mapping. We have completed
the initial phase of corridor mapping using the
AECOM Nature Networks tool.
We are planning on drawing our corridors from
scratch based on a prioritisation framework for
each habitat type with the data we have
available. We have a more developed plan for
woodland connectivity and are planning to
create the same for the other habitat types.
Land use L23 -
New
1. Halting
biodiversity
loss.
2. Protecting
and enhancing
habitats and
species.
3. Peatland
Restoration
and
enhancement.
Identify Strategic Green Networks wholly
and partially within Perth and Kinross and
opportunities for their enhancement.
Identify Strategic Green Networks wholly and
partially within Perth and Kinross and
opportunities for their enhancement.
Planning and
Development
H H A Desk-based mapping and opportunity
assessment underway as part of BGI audit. GN
will focus on active travel routes linking key
assets. Includes Traffic and Network Active
Travel priority list and community engagement
outputs. Links with NN opportunities. Working
through settlements individually as part of
Locality Profiles.
Blue-green networks are being identified
alongside the LDP3 Locality Profile exercise.
This process is currently being piloted in
Highland and Strathtay, starting with Pitlochry. 
All localities programmed to be completed by
Dec 2025.

Page 34

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
133
134
135
Land use L24-
New
Enhance
landscape
scale
sequestration.
Review and revise our Forestry and
Woodland Strategy (FWS) as part of
LDP3 process. Consider how the FWS
can support and encourage private
landowners to plant “the right tree, in the
right place” to help tackle the climate
change and biodiversity crises.
1.  Review existing FWS in light of JHI study
outcomes, national policy and both climate
and nature crises.                                      
2. Work with partner agencies and
organisations to develop e.g. Forestry and
Land Scotland and NFUS                                        
3. Undertake SEA                      
4. Produce draft strategy and consult/engage                           
5. Amend and seek Council Approval                                    
6. Support FWS implementation
Planning and
Development
T T G LDP3 Evidence Report has been returned due
to insufficient evidence linked to Education
data However, no issues were raised in relation
to the evidence submitted on the Forestry,
Woodland and Trees topic. Initial drafting has
taken place for elements of the FWS review,
and the SEA Scoping exercise is underway. 
Draft FWS expected to go to E+I  Committee in
May 2026, followed by a period of engagement. 
Land use L25 -
New
Improving our
open spaces.
Undertake an Open Space Audit and
produce an Open Space Strategy
1. An audit of existing open space provision
(all spaces of 0.2ha or greater in size and any
other spaces considered relevant);
2. Policies and proposals as to the
development, maintenance and use of green
infrastructure in Perth and Kinross, including
open spaces and green networks.
Planning and
Development
H H A A survey to inform the Open Space Quality
Audit has been carried out of over 500
accessible open spaces within or adjacent to
settlements . The results of this are to be
revised and confirmed to finalise the OSQA and
inform the Council’s Open Space Strategy.
For the strategy, initial policy review has been
completed with input from across departments.
Analysis of engagement results is underway.
Drafting strategy to proceed following
completion of audit.
Land Use L26
(formerly
R14)
Resilient
ecosystems
Continuing contribution and support to the
delivery of Nature Rich Leven and other
catchment management approaches 
Explore the feasibility of a pilot natural flood
management site in the Upper Leven
Catchment.
Climate Change
and Zero
Waste/Planning
and Development
H H G Leven LENS partnership agreements signed in
2025.
The first round of trades has been agreed for
10–15 farms in the Leven catchment. 5 farms
are within PKC and 4 of 5 were eligible for PKC
funding. The farms are located adjacent to the
following rivers: Gairney Water, Greens Burn,
South Queich, Killoch Burn.
The PKC £20k of investment has helped
leverage in £175k to the wider Leven
Catchment

Page 35

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
136
137
138
139
Land Use L27
(formerly
R23)
Flood risk
management
Use planning system to avoid an increase
in flood risk
1. Feedback on draft NPF4 and then await
finalised NPF4. Feedback provided, and NPF4
finalised February 23.
2.Update Local Development Plan (LDP)
Policy 52 New Development and Flooding to
add detail to NPF4 if necessary to strengthen
current encouragement for flood resilient
materials and construction methods
particularly where adjacent to medium and
high risk areas to make this a requirement.
Proposed LDP3 to be prepared during 2025
engaging with Flood team and SEPA on
whether there is a need for more detailed flood
Planning and
Development
H H A SEPA and Council’s Flooding Team agreed with
the review of relevant evidence linked to flood
risk and water management and summary of
implications for the Proposed Plan provided in
LDP3 Evidence Report.  A SFRA for LDP3 has
been undertaken, and the proposed Site
Assessment and SEA Checklist template will be
used to ensure new site proposals selected for
inclusion within LDP3 will not increase the risk
of flooding
Transport T1 Increase
active
transport
across Perth
and Kinross
Develop comprehensive Mobility Strategy
for Perth and Kinross 
1.Extend the representation of the Mobility Bo
ard to ensure co-
production of the Mobility Strategy with partner
s and stakeholders.                                           
2.
Carry out research into modal shift requiremen
ts, to inform the development of the Mobility St
rategy
Planning and
Development
N/A N/A Complete Complete
Transport T2 Increase
active
transport
across Perth
and Kinross
Maximise the potential utilisation of Smart
er Choices, Smarter Places (SCSP) fund t
o deliver sustainable and active travel.
Proposed new wording:
Maximise the utilisation of People &
Place funding from Transport Scotland
to deliver behaviour change interventions
that encourage increased uptake of
sustainable and active travel options.
1. Active & Sustainable Transport Behaviour
Change Strategy
Planning & Devel
opment
H H G The Early Years Project promotes behaviour
change through engagement with adults and
children in the form of cycle confidence classes
and learn to ride. In the Winter months, classes
teach about nighttime cycling, wet weather
cycling and maintenance. The aim  is to
encourage year-round cycling. Learn to Ride
programmes through Sustrans encourage
cycling at an early age and input from the
emergency services will allow children to be
further educated in road safety and for pupils to
ask questions through an interactive learning
model.
Transport T3 Increase
active
transport
across Perth
and Kinross
Update the existing Active Travel Strategy
that works for everyone in line with
Transport Scotland’s Active Travel
Strategy Guidance (February 2023) and
develop comprehensive
active travel network in association with
1. Cross departmental scoping
2. Active Travel Network Plan
3. Active Travel Infrastructure project
prioritisation
4. Behaviour Change Strategy
Planning and
Development
T T A Project brief under development. Active Travel
Infrastructure prioritisation exercise has been
undertaken. Study to be commissioned to
develop a strategy for existing and planned
behavioural interventions which encourage
active & sustainable transport to focus the

Page 36

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
140
141
142
143
Transport T4 Increase
active
transport
across Perth
and Kinross
Design and deliver a Perth City Cycle
Network, based on the Perth Cycle
Network Masterplan (2018)
1. Dunkeld Road Corridor (with integrated bus
priority measures)
2. Perth City Centre Network (as part of
Circulation Plan)
3. Remaining radial roads
Planning and
Development
H H A £340k secured from Transport Scotland Bus
Infrastructure Tier 2 fund to take the Dunkeld
Rd project up to RIBA Stage 2 design in 25/26.
The design will integrate previous proposals for
bus priority measures and active travel
improvements.
Feasibility study of active travel improvements
along Glasgow Road from Broxden into city
centre also planned for 25/26.
Transport T5 Increase
active
transport
across Perth
and Kinross
Lobby Scottish Government to include sus
tainable transport and active travel in the
school curriculum.
Proposed change to action:
1. Assessment of where we are with respect to
school travel plans
2. Work with pilot cluster of schools on school
travel plans,
3. Continue to deliver Bikeability Level 2
Planning and
Development
H M A Proposed changes to wording of action to
reflect through the Learning for Sustainability
there are already mechanisms that this could be
included.
Transport T6 Increase
active
transport
across Perth
and Kinross
Deliver measures to increase walking and
cycling to schools and improve air quality
1.  Introduction of school exclusion zones
2.  Deliver bikeability and other training in
schools
3.  Refresh and update school travel plans
4. Deliver active travel/road safety
improvements
Planning and
Development
H H G The Early Years Project is a coordinated
approach to promote road safety and
encourage active travel to/from school, with
input from emergency services and external
cycling partners. Six schools are part of the pilot
requiring a review of school travel plans and
with monitoring and evaluation throughout to
gauge effectiveness . Development of the travel
plan will be a joint effort including T&N, Climate
Change, and Education and Learning
colleagues. Results from school travel plans
can be used to address infrastructure/road
safety barriers using ATIF Tier 1 or match
funding from elsewhere. Possibility of spending
to save if new infrastructure fulfils criteria, such
that school transport no longer needs to be
provided. People and Place Direct Award can
be used to fund school cycle parking
improvements.
Transport T7 Accelerate the
EV transition
Develop a strategy for the expansion of E
V charging infrastructure
Cross service working Planning &
Housing Strategy
Manager
N/A N/A Complete Complete

Page 37

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
144
145
146
147
148
Transport T7a Accelerate the
EV transition
Deliver the P&K wide EV Charging
Expansion Programme
1. Selection of private sector partner
2. Infrastructure rollout & promotion
Planning and
Development
T T G Work is on-going with Angus Council and our
Technical Partners Urban Foresight to complete
Procurement Strategies and Tender
documentation. External Legal advice has now
been procured.  Invitation to Tender is planned
for October/November 2025. Contract award is
expected to be March/April 2026.
Transport T8 Accelerate the
EV transition
Work with Taxi Operators to accelerate th
e transition to electric vehicles
Cross service working Licensing
Department
H M A This question was included in a recent public
consultation regarding numbers of taxis in
Perth. The Licensing Committee will be
considering the outcome of that consultation.
Transport T9 Accelerate the
EV transition
Work with Transport Scotland to deliver th
e Electric A9 project
Complete Planning and
Development
N/A N/A Complete Complete
Transport T10 Accelerate the
EV transition
Develop and implement a strategy to
transform the
Council’s fleet to electric and alternative fu
el vehicles
1. Implement the trial and expansion of HVO
into the Council's HGV fleet.
2. Develop business case for fleet
transformation and for fleet charger expansion
3. Deliver the Inveralmond Pool Hub EV
project
Fleet Manager T T A An outline business case for the future of pool
vehicles is being developed aimed at:
• purchasing an additional 10 electric vehicles
each year over the next three years
• increasing the number of available charging
points
• purchasing electric vehicles where pool
vehicles are due for replacement.
Hydrotreated vegetable oil is now being used by
the Refuse Collection Vehicle fleet and is likely
to be extended to the rest of the waste HGV
fleet by the end of Oct 2025. This should see
annual CO2 savings of c750-1000 tonnes per
year. 
Also under consideration are:
• the installation of a hydrogen facility at the Transport T11 Accelerate the
EV transition
Develop the low carbon and active travel
hub’s project
Complete Planning and
Development
N/A H Complete Complete

Page 38

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
149
150
151
152
Transport T14 Reduce
vehicles in
town centres
Develop a revised and expanded
Corporate Travel Plan for Perth and
Kinross that covers the full range of
Council activities
1. Scoping & brief development
2. Plan development & resource identification
3. Travel Plan implementation
Head of
Environmental &
Consumer
Services
H H R Initial scoping and resource requirements for a
PKC Corporate Travel Plan will be mapped out
in 25/26. In the interim, personalised commute
plans have been offered to staff based in Pullar
House, 2 High St and Carpenter House using
funding from Tactran. This coincides with the
changes staff car parking policy at Kinnoull St
car park.
Transport T15 Remove
vehicles from
town centres
Review options for workplace parking (incl
uding workplace parking levy), as a mean
s to support more sustainable transport ch
oices to disincentivise use of cars.
Property L M G In parallel with the purchase of Kinnoull St car
park by PKC, staff business parking allocations
in Kinnoull St, Canal St and Thimblerow car
parks have been reviewed. Business parking
will now only be provided for staff in roles which
undertake business travel and for which pool
vehicles are not currently available and/or
suitable. Permission for other staff who
previously had permission to park free in these
car parks has ended, in line with the Council's
environmental sustainability goals.
Next year, supporting corporate and business
travel planning
Transport T16 Improve public
transport
provision
Utilise People &
Place funding to support discounted bus f
are initiatives targeting young people.
Complete Parking, Public Tr
ansport and Civil
Contingencies
H H Complete Complete, free bus travel now offered to all
under 22s by Scottish Government
Transport T17 Improve public
transport
provision
Expand the potential demand for responsi
ve transport and community transport sch
emes
Parking, Public Tr
ansport and Civil
Contingencies
H H G Council owned MPV provided to Muthill
Community Transport Group to deliver a
community transport service in the Muthill and
Crieff areas.
Council owned MPV provided to Kirkmichael
Community Transport Group to deliver a
community transport service in their area.

Page 39

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
153
154
155
156
157
Transport T18 Reduce
vehicles in
town centres
Investigate options and develop plans for f
uture park + chose sites at Bertha
Park, Walnut Grove and Bridge of Earn.
1. P&R utilisation surveys (in progress)
2. Park & Choose Feasibility Study
Planning and
Development
T T A Land secured through planning process.
Developing strategic business case for new
park & ride sites, alongside review of existing
Park & Rides site usage
Transport T19 Improve public
transport
provision
Identify options and costs to establish an
annual “Sustainable Transport Week as
an incentive to raise the profile of public tr
ansport by bus and promote public transp
ort.
1. Promote the free bus Saturdays
2. Develop a plan for 2026 sustainable travel
week
Climate Change
and Zero Waste
L L R Free transport on all local bus services across
Perth and Kinross on the first Saturday of each
month.
Action moved to CCSDF team for Year 5 - plan
to be developed for 2026 implementation
Transport T20 Improve public
transport
provision
Explore operating registered school buses
within Perth City for non entitled pupils att
ending their catchment secondary school t
o reduce school run journeys.
Parking, Public Tr
ansport and Civil
Contingencies
L L A Review of transport for school is underway as
part if the Transport Transformation project due
to report in late 2026
Transport T21 Improve public
transport
provision
Improve bus stop infrastructure 1. Undertake Impact assessments to identify
target sites
2. Implement improvements
Parking, Public Tr
ansport and Civil
Contingencies
M H R Bus stop infrastructure and accessibility
improvements are ongoing as and when funding
allows. This includes expanding the network of
Real Time Passenger Information (RTPI)
displays. Transport T22 Improve public
transport
provision
Improve bus priority measure at junctions
through reconfiguration and/or managed
by traffic lights using new technology and
providing new bus lanes on key corridors.
Traffic and
Network Manager
M N/A G Bus priority system implemented in 2024 in
citybound direction on Glasgow Road, Crieff
Road, Edinburgh Road, Dunkeld Road, Dundee
Road and A94 Scone Corridors. PKC traffic
management system has been linked to bus
operator systems. This allows the Council to
determine the GPS location of each bus and if

Page 40

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
158
159
Transport T23 Improve public
transport
provision
Perth Bus/Rail Interchange Project:
Working with Transport Scotland /Network
Rail
1. Business Case Development Planning and
Development
M H A An Options Appraisal has identified the
preferred option as:
• a re-developed Bus Station to replace the
existing poor-quality building at its existing site
• a new public space in the existing Railway
Station car park to create a new improved
gateway at the station
• Creation of a new, rear access car park and
active travel hub to Perth Railway Station at St
Leonards Bank
• An enhanced pedestrian connection from the
station to the city centre
Consultants have been appointed to develop
Outline and Full Business Cases for the project.
Transport T24 Reduce
vehicles in
town centres
Proposed new wording:
Deliver air quality improvement projects
within the Perth Air Quality Action Plan
with a focus on projects with joint air
quality and climate change benefits
Apply for Scottish Government funding for
air quality projects in 2023/24 which
include cross service projects to tackle air
quality and climate change.
Regulatory
Services
Manager
H H G Main focus of 2024 was finalising the Perth
AQAP, which will drive air quality improvement
projects for the next 5 years. PKC received
£193k from the Scottish Government Air Quality
Grant for 25/26 projects, with the majority of
that funding allocated towards ongoing AQ
funding like the previous year. SG have advised
that further cuts to AQ Grant should be
anticipated in the coming year, meaning
alternative funding routes will be required to
advance AQ work

Page 41

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
160
161
162
163
Transport T25 Reduce
vehicles in
town centres
Proposed new wording:
Continue to monitor the need for and
potential benefits of a
Low Emission Zone (LEZ)
or alternative vehicle access restrictions
in Perth City AQMA to reduce emissions.
Continue to monitor the need for and
potential benefits
for Perth City and Crieff AQMAs to identify
if the creation of Low Emission Zones (LE
Zs) or alternative vehicle access restrictio
ns could reduce emissions.
Regulatory
Services
Manager
M H G Crieff AQMA now revoked as of December
2024, and no longer needs to be considered for
an LEZ. Perth AQMA will be investigated next
year for the possibility of revoking for NO2 due
to continued compliance (with the PM aspect of
the AQMA still in place). No requirements from
Scottish Government to reassess the Perth
AQMA for an LEZ, however this may be
something which is revisited as part of the
replacement strategy for CAFS2 (due 2026)
Transport T26 Reduce
vehicles in
town centres
Investigate options for further air quality re
lated 
measures which support climate change
mitigation.
1. Development of new Perth AQAP
2. Delivery of the actions identified in the
AQAP
Regulatory
Services
Manager
M M G Updated Perth AQAP approved at committee
20 August 2025 and contains new AQ
improvement measures to reduce both air
pollutants and green house gasses. The new
AQAP will be carried out over a 5 year period.
Transport T28 Reduce
vehicles in
town centres
Make improvements within Perth City
Centre to reduce car dominance and
improve sustainable and active travel
choices following CTLR opening
1. Development of Perth Circulation Plan
including key principles
2. Implement Phase 1 actions
3. Implement Phase 2 actions
4. Implement Phase 3+ actions
Planning and
Development
H H A Consultant study completed setting out a
proposal for connected sustainable transport
networks and through traffic reduction in the city
centre
£340k secured from Transport Scotland BIF to
deliver short term improvements on South
Street in line with the plan.
Elected member engagement ongoing in
Autumn 2025.
Transport T29 Reduce
vehicles in
town centres
Expand and promote shared transport
options
1. Promote car sharing on existing national
platform
2. Explore the establishment of car clubs
3. Explore the establishment of bike sharing
schemes
Planning and
Development
H M R No progress

Page 42

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
164
165
166
167
168
Transport T30 Reduce
vehicles in
town centres
Develop a Strategic Parking Policy to
align with the Mobility Strategy's vision
and objectives that will assess utilisation,
integration, parking provision, demand,
safety and sustainable transport
alternatives.
1. Undertake parking surveys
2. Develop and adopt parking policy
Parking Services H M R Comprehensive Perth city centre parking
surveys of  have been performed showing that
there is spare city centre parking (maximum
occupancy 56%). Survey data will be used to
inform parking arrangements proposed by the
Circulation Plan.
Transport T31 Reduce
vehicles in
town centres
SURFLOUGH Programme - Distribution
and logistics
Proposed new wording:
Support partners to assess options on last
mile freight delivery and the sustainable
movement of goods
Planning and
Development
L M A Options for sustainable logistics to be
considered as part of Perth Eco Innovation
Park. Continue to engage with the wider freight
and haulage industry via the TACTRAN Freight
Quality Partnership. 
Transport T32 Improve public
transport
provision
Develop a Public Transport Strategy to
guide the development of the public
transport system across the region for the
benefit of those visiting, working and living
in Perth and Kinross.
Strategy will support and respond to the
ongoing PT transformation project.
Planning and
Development
T T G The Transport Transformation project will set
the strategic direction for public transport and
propose a new model for in-scope transport by
March 2027. In scope are a review of potential
to use new bus powers within the Transport
(Scotland) 2019 Act, transport for school, health
& social care & looked after children, plus
communications.
Transport T33 Increase
active
transport
across Perth
and Kinross
Implement workshops and training as well
as advertisement and promotional
campaigns to increase awareness of the
Avoid-Shift-Improve Framework, and
subsequently increase the number of
journeys made by sustainable travel
modes.
1. Deliver PKontheGo programme
2. Develop new approach aligned with the new
Avoid-Shift-Improve Framework
Planning and
Development
H H R Developing a PKC MaaS solution in FY25/26 in
partnership with TACTRAN which will form part
of the wider behaviour change promotion
activities. Continued partnership working with
TACTRAN on the delivery of the People and
Place programme.
Transport T35 Accelerate the
EV transition
Develop an EV awareness and behaviour
change campaign
1. Develop comms plan - Feb 26
2. Deliver Phase 1 - Mar 26- Aug 26
3. Deliver Phase 2 - Post EVIF improvements
late-26/27
Planning and
Development
H M R No work has commenced in regards to a
Behaviour Change Campaign.  Plans to
commence initial planning of one in December
2025

Page 43

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
169
170
171
172
173
174
Transport T36 Reduce
vehicles in
town centres
Raise awareness of alternative approache
s to attending meetings across Council e
mployees; including tele/video conferencin
g and provide training on using ICT equip
ment to reduce transport emissions
Complete Head of
Corporate IT
N/A N/A Complete Complete
Transport T37 Accelerate the
EV transition
Publish and promote to Council employee
s the car lease scheme currently being de
veloped for electric vehicles.
1.  Added to Council sustainability pages
2. Promote on ERIC
3. Refresh of promotion (2026)
Human
Resources
M M G
Transport T38 Improve public
transport
provision
Explore the potential for EV bus chargers
across the Council Area
Planning and
Development
M H G As part of EVIF installations we will potentially
install a charger at Kinross P&R to facilitate
minibus charging. No further liaison with the EV
Team has been carried out in regards to Bus
charging at South Inch Car Park, Perth. Further
developments are required to facilitate bus
charging within P&K.
Transport T39 Improve public
transport
provision
Explore community transport priming - re-
establish community transport forum
1. Deliver community mini-bus transfer
scheme
2.
Community Public
Transport
M H A Community Transport Forum has been
established.
Climate Connect also tasked with supporting Transport T40 Accelerate the
EV transition
Explore embedding EV vehicles in Council
Taxi procurement
1. Map out upcoming tenders
2. Complete transport transformation
programme
3. Develop revised procurement strategy
Communities
Public Transport
M M R Discussions with Council Licensing colleagues
still to be arranged regarding incentives to
increase the use of EVs in the Taxi/PHV fleet.
PTU to consider EV contract options in future
tendering exercises.
Transport T41 -
New
Increase
active
transport
across Perth
and Kinross
Use LDP3 to plan developments where all
essentials (shops, schools, parks) are
close by or easily accessible by
sustainable modes of transport to reduce
the need to travel and minimise the use of
Planning and
Development
H N/A New New action proposed for Year 5

Page 44

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
175
176
Waste &
Circular
Economy
W1 Data &
Strategic
Targeting
Conduct a more detailed greenhouse gas
assessment of the Waste projects and
activities, to prioritise future climate
change activities.
Carbon Metric Factors Summary Report and
Scenario Modelling.
Investigate national co-ordination and support
to ensure a consistent methodology and
accurate data-set is utilised.
Waste Services L H G The top 5 materials by tonnage actually
collected during 2024, which present  the
greatest  total carbon impact are:                                                               
1) Household and similar wastes                                                                                   
2)Animal and mixed food wastes                                                        
3)Mixed and undifferentiated materials                                             
4)Plastic wastes                                                           
5) Textile wastes                                                            
However, Textiles have the greatest carbon
impact  per tonne. This information helps us to
identify target materials for intervention
Waste &
Circular
Economy
W2/W20 Data &
Strategic
Targeting
Undertake a Perth & Kinross Circular
Scan to establish a baseline for the
Circular Economy Route map.  Work with
the Resources Management Association
Soland (RMAS) to decarbonise and liaise
with the Business & Industry Group
Building on initial Material Flow Analysis (MFA)
and industry sectoral study, a current state
analysis will be conducted.
Waste Services H H G An output from last year's industry seminar on
circular economy business opportunities was to
provide a focus for attracting and supporting
new initiatives. This has led to the creation of
the Clean Growth Axis collaboration.  This is a
digital support platform to facilitate the growth of
sustainable industries in PKC through
agreements with statutory bodies, academia,
and industry organisations. Two prospective
projects (one recycled copper smelting and one
acrylic carpet recycling) are being trialled
through the process before formal launch of the
platform in March next year. A further business
engagement event is arranged for 14th of
November to get feedback from businesses on
draft circular economy strategy

Page 45

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
177
Waste &
Circular
Economy
W3/W9/
W10
Data &
Strategic
Targeting
Food Waste: Gather data to create a
baseline of knowledge, participation and
barriers.                       Develop a Food
Waste Action Plan.                                  
Review interim Food Plan in 2022
following the evaluation of the National
Food Waste Reduction Plan
Proposed wording: Develop and deliver a
Food Waste Action Plan
Food waste survey for householders,
businesses and organisations on
Commonplace.                                     Public
Consultation. Action Plan Developed.                       
Watching brief on national consultations.                           
Model service requirements if required.
Climate Change
and Zero Waste
H H A Food Waste Action Plan commenced early
2025 with the key points highlighting that the
majority of food waste is avoidable, promoting
Food Waste bins can be used without a permit,
raising awareness of environmental and
financial costs, promote the various elements of
food waste planning to reduce food waste and
rethink our food habits. This is being
undertaken through an array of communication
channels to target as wide an audience as
possible including Facebook, PKC Website,
food waste monitoring, attending events, along
with working with organisations and
communities. Additional Food Waste hubs were
also distributed in Summer 2025 reaching 585
households. Establishing measurements
regarding impacts remains to be difficult,
however  we will review the Waste Composition

Page 46

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
178
Waste &
Circular
Economy
W4/W14 Data &
Strategic
Targeting
Confirm a baseline for behavioural change
and develop a Circular Economy route
map including an action plan for Circular
Textiles & Sustainable Fashion
Public Consultation. Action Plan to be
developed
Climate Change
and Zero Waste
H H G Textiles has been identified as a priority in the
Scottish Governments CE & Waste Route Map
to 2030, therefore the Textile Campaign aims to
highlight the key messages of reduce, reuse
and repair. Whilst textiles make up only 4% of
household waste in Scotland it accounts for
32% of the carbon impact (including upstream).
The campaign is approaching this though a
variety of outlets including workshops, Climate
Cafe swap shop, mend and repair events, along
with social media outlets.  
A number of textiles events are taking place
during Autumn/Winter/Spring of 2025/26,
including swap shop, co-hosted book launch
and promotion of re-use, repair and recycling.
Measuring is tricky, but will review textile bank
tonnages, Waste Compositional Analysis, event
feedback and Facebook and website metrics.

Page 47

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
179
180
181
Waste &
Circular
Economy
W5/W2
(Action
no in
interim
report)
Ensure
alignment with
the Scottish
Government
Climate
Change Route
map
Review how the national Deposit Return
Scheme (DRS) and Extended Producer
Responsibility can be introduced
effectively in Perth and Kinross &
regionally.
Extended producer Responsibility Consultation
Response Submitted                                            
Provide indicative cost & performance
modelling (rural collections) data to inform
research phase for EPR                                                                        
Watching brief on implementation dates
Waste Services M H A The Packaging Extended Producer
Responsibility (pEPR) scheme is now
operational. PKC has been informed that it will
receive funding of ££3.795M during 2025-26.
An indication of funding for 2026-27 will be
received during November 2025.                                    
Whilst there has been a reduction in funding,
£843k has been made available on a non-
recurring basis to support improvements in
service efficiency and effectiveness. A delivery
plan of selected projects is in place and being
implemented over a spread of 3 years.                                                                       
The Deposit Return Scheme is scheduled to be
implemented in October of 2027. The Zero
Waste team will re-engage with Zero Waste
Scotland to assess the potential impact of DRS
on PKC operations and associated emissions.
Waste &
Circular
Economy
W6 Ensure
alignment with
the Scottish
Government
Climate
Change Route
map
Watching brief on requirement to provide
separate collections for garden waste and
textiles by 2023 & 2025 (EU Commission)
Watching brief on national consultations                                
Model service requirements if required
Climate Change
and Zero Waste
M H G PKC officers have responded to Scottish
Government consultations on food waste and
textiles. To date there have been no national
updates. The Circular Economy Route map
indicates that national policy will be in place by
early 2027.
Waste &
Circular
Economy
W7 Ensure
alignment with
Scottish
Government
Legislation
and Climate
Change Route
map
Review implications of Circular Economy
Bill which will encourage the reuse of
products and reduce waste. The bill will
tackle our reliance on single-use items
and include measures to tackle textile
pollution/fast fashion.
Watching brief on national consultations                                
Model service requirements if required
Climate Change
and Zero Waste
H H G PKC draft Circular Economy Strategy was
approved for public consultation at the CC&S
Committee on 20 August. The public
consultation closed on 24 October and a
number of separate, targeted workshops and
discussions have taken place. The output of
this engagement will inform the finalised
strategy and action plan, which will be
presented to CC&S Committee in February
2026.

Page 48

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
182
183
184
185
Waste &
Circular
Economy
W8 Ensure
alignment with
Scottish
Government
Legislation
and Climate
Change Route
map
Carry out a further review of actions on
completion of the Scottish Government 
Route map review in 2022. The Scottish
Government review will consider whether
the national targets and interventions align
with net zero.
Attend Stakeholder engagement Sessions      
Watching Brief on national consultation (March
2022)
Climate Change
and Zero Waste
H H G The draft PKC Circular Economy Strategy
mirrors the priorities and timelines of the
Scottish Government's Circular Economy Route
Map. Zero Waste officers continue to engage
with the Scottish government, Zero Waste
Scotland, CoSLA and the local authority Waste
Manager's Network to keep track of
developments and to take part in co-creation
activities such as the development of a new
code of practice for household waste and
recycling. Specific PKC policies will be
developed and taken through governance as
the national picture becomes clearer.
Waste &
Circular
Economy
W11 Thematic
Action Plan for
High Carbon
Materials
Ensure the effective collection of
consumable surplus food from all stages
in the supply chain, from farms to
retail, and redistribute it to community
food organisations while working to raise
the nutritional standards of the food  being
offered.
Incorporate as part of the Good Food Strategy
& Action plan
Climate Change
and Zero Waste
M H A Work is due to commence from the second
quarter of 2026 with current staff looking to
develop a PKC Good Food Nation Strategy. It is
intended that a resource will be recruited to
undertake the development of policies and
government process.
Waste &
Circular
Economy
W12 Thematic
Action Plan for
High Carbon
Materials
Develop & Maximise Recycling Services
by (1) expanding PKC recycling services
to include flexible plastic packaging and
hard rigid plastics (2) Expand recycling
services (Food/DMR) in Perth City Centre
Action Plan for Twin Stream Recycling Service
change including Contract Strategy
development.                                  Action Plan
for Perth City Centre
Waste Services N/A N/A Complete Complete
Waste &
Circular
Economy
W13 Thematic
Action Plan for
High Carbon
Materials
Maximise value from waste through
reduction of greenhouse gas emissions
via diversion of waste from landfill into
recycling and energy production
Secure a long-term residual waste treatment
solution to meet the implementation date for
the ban on landfilling biodegradable municipal
waste ban by 31 December 2025. Waste
Analysis completed  Autumn 2021. Procure
Contract by March 2022 (latest). Award
contract by December 2022
Waste Services N/A N/A Complete Complete

Page 49

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
186
187
188
Waste &
Circular
Economy
W15 Promote a
rapid transition
to the Circular
Economy
Review PKC procurement processes to
embed circular economy principles to
reduce consumption of products and
materials and make better use of existing
products including tackling single use
items
Embed Sustainable Procurement Duty and
promote sustainable procurement tools. 
Investigate Circular Procurement
opportunities.
Work has started on the implementation of
Sustainable Procurement toolkit.
Corporate
Procurement
Team
H H A
Waste &
Circular
Economy
W16 Leading by
Example
Development of a Resource Management
Plan for Education & Children's Services
Plan Agreed Climate Change
and Zero Waste
H H G The Schools Recycling Improvement project is
well underway. Planning for the Bertha Park and
Crieff associated schools groups is complete.
New bins for Bertha Park cluster are being
installed during September and October 2025
and new bins for the Crieff cluster are expected
to be delivered by the end of November.  The
next cluster will be the remaining Highland
Perthshire schools associated with Breadalbane
and Pitlochry High Schools.  Separately to this
project, new bins have been provided at the
new Perth High School.
Waste &
Circular
Economy
W17 Leading by
Example
Asset Management Review of Waste &
Recycling Infrastructure
Building Condition & Suitability Surveys
including Climate Change Action Audit,
Options Appraisal
Climate Change
and Zero Waste
T T Complete Final report complete, the purpose was to
evaluate the impact on waste and recycling
collection services of depot rationalisation and
understand the impact on the number of
collection resources required to complete
collections across the authority area to
determine the viability of each scenario. The
next stage will be to present this information
through  the appropriate governance process.

Page 50

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
189
190
Waste &
Circular
Economy
W18 Leading by
Example
Review PKC purchasing Policy in line with
Scottish Legislative Single Use Plastics
Ban coming into force in 2022.  Explore
initiatives to reduce the quantity of single
use items used by the Council
1. Reduction in Single Use products being
purchased internally
2. Engage with PKC users and partners who
use single use products and work towards a
reduction, or outright ban
3. Single use products no longer available for
procurement via in-house purchasing systems,
apart for exempt use e.g. health care
4. In-house campaign highlighting alternatives
to single use products
5. External campaign highlighting alternatives
Climate Change
and Zero Waste
M M A Compostable cup recycling implemented at
Perth Art Gallery.
Working with Bertha Park HS and Tayside
Contracts to implement compostable packaging
recycling in the lunch hall. If successful this can
be rolled out to other schools as part of the
Schools Recycling programme.
Waste &
Circular
Economy
W19 Cross Cutting
Theme/Strateg
ic Action
Develop a Good Food Partnership and
prepare a Good Food Strategy & Action
Plan for Perth & Kinross.
Elected Member & Stakeholder Engagement &
Public Consultation
Climate Change
and Zero Waste
H M A PKC have a duty to complete a GFN strategy
within 12 months of the publication of the
Scottish Government GFN Plan.  Consultation
on the SG plan happened in summer 2025, but
the plan as not yet been published.
The lead for this has recently been moved to
the Climate Change and Zero Waste team,
within the E&I service. Initial information
gathering and networking is taking place during
autumn/winter 2025-26 and work on developing
a PKC strategy will begin in earnest in the
spring of 2026. This is dependent on the
Scottish Government publishing its national
strategy in this timeframe.

Page 51

PKC - GENERAL#
1
A B C D G H L M P S
Delivery
Theme
Action
Number
Sub-Goal Strategic Action Milestones/ Supporting actions Lead
Department/
Service
Proposed
prioritisation Year 5
(T,H, M, L)
Prioritisation Year 4
(T,H, M, L) Progress
(RAG)
Progress Year 4
191
Waste and
recycling
W21 Cross Cutting
Theme/Strateg
ic Action
Develop a Waste & Circular Economy
Strategy to align with the Circular
Economy Bill.
Establish a Stakeholder Advisory Group
Review existing activities falling under the
Circular Economy and align with internal &
national policy.
Develop strategy and action plan
Climate Change
and Zero Waste
T T G PKC draft Circular Economy Strategy was
approved for public consultation at the CC&S
Committee on 20 August. The public
consultation closed on 24 October and a
number of separate, targeted workshops and
discussions have taken place. The output of
this engagement will inform the finalised
strategy and action plan, which will be
presented to CC&S Committee in February
2026.                                                                 
A number of textiles events are taking place
during Autumn/Winter/Spring of 2025/26,
including swap shop, co-hosted book launch
and promotion of re-use, repair and recycling.