Appendix A
Annual Climate Action Update
Year 4

Page 2

Introduction
This report highlights Perth and Kinross Council’s commitment to climate change and
reports back on the delivery of fourth year of our Climate Change Strategy and Action
Plan.   This report highlights some of the impactful work the 30+ teams across the
Council that have been delivering on climate action over the past year to help address
the climate and nature crisis as well as more widely helping residents to live life well.
As has been seen by events over the last few years, climate change can no longer be
thought of as a future risk but is a real and pressing emergency. While the Council is
balancing many priorities with limited resources, many of the actions in the plan have
had and will have the ability to deliver wider benefits and address other Council
priorities around poverty reduction and economic growth.
We are striving to lead by example and this year we achieved 16% year-on-year
reductions in our Scope 1,2 and 3 emissions. Improving how we manage the waste
achieved significant savings. We continued to green our fleet and piloted alternative
fuels in our heavy goods vehicles.  We also improved the efficiency of our estate,
including the opening of Scotland’s first Passivhaus leisure centre.
We also used our control and levers of influence to drive area-wide action.  We
facilitated free home-energy advice to over 1600 households, grant-funded over 40
businesses to support their ambitions to green their businesses and increased the
cycling skills of over 2,000 school children across the area.  Recognising the importance
of community action, we made 22 community Nature Restoration Fund grants, helped
refresh our climate commission – SHIFT and supported Climate Connect- a new
network for community climate action to launch.
While it is important that Perth and Kinross Council plays its part its reducing
emissions, there is a certain amount of change already locked into the system.  These
changing climate patterns and the resultant water shortages, wildfires, flash flooding
and more prevalent storm events are already impacting on Perth and Kinross.
Recognising that many of these risks do not end at local authority boundaries, this year
we jointly launched Climate Ready Tayside in partnership with Dundee City and Angus
Councils.  At the other end of the spectrum, we know it is our communities that
experience the impacts and often are best placed to respond. We have nearly doubled
our number of community resilience groups up to 63 and increased the resources and
training we are able to offer.
In order to meet our decarbonisation targets and keep pace with the changing climate
risk, the pace of change needs to accelerate.  This will require a consistent policy
framework, long-term resources to be secured, the creation of the right enabling

Page 3

environment for others to take action and bringing our residents and businesses along
with us.  
Climate Change Strategy and Action Plan
The Climate Change Strategy
and Action Plan (CCSAP) was
unanimously approved in
December 2021 and then
updated as part of the
annual reporting process in
November 2022. This report
provides the update on PKC’s
climate action, covering the
fourth year of delivery, from
October 2024 – September
2025. 
Perth and Kinross Council (PKC) in December 2022 recognised ‘Tackling climate
change and supporting sustainable places’ a one of the key corporate priorities
identified in the new Corporate Plan.  This further strengthens PKC’s commitment to
addressing the climate and ecological emergency, as outlined in its (CCSAP).
The CCSAP is divided into long-term objectives, Council Commitments and eight
thematic plans.

Page 4

Table 1 Objectives and commitments

Page 5

Overall Highlights
The Council has made noticeable progress this year against all six of our overarching
objectives and 27 Strategic Commitments, the highlights of which are detailed below.
1. Achieving Net Zero aligned with the Paris Agreement and the Scottish
Government Targets, with the ambition of achieving them sooner. 
 We reduced the Council’s own emissions by 16% year-on year. 
 Our upgraded Building Management system software reduced energy
consumption by 3,000MWh in its first year, with annual financial savings of circa
£100,000.
 We opened Scotland’s first Passivhaus Leisure Centre - Blairgowrie Recreation
Centre and Perth High School our first Passivhaus secondary school.
 We piloted the use of Hydrotreated Vegetable Oil (HVO) in our Refuse Collection
Vehicles and have committed to expand this to all RCVs by the end of 2025. This
will improve air quality and save 700-1000 tonnes of CO2e annually
 PKC secured £1.1M funding from Transport Scotland for EV charging points. A
private operator will be appointed to install 64 charging points over 3 years
across PKC.
2. Building a more resilient Perth and Kinross
 We launched Climate Ready Tayside together with Angus and Dundee Councils
in spring 2025. This new regional adaptation partnership will address cross-
boundary risks and share best practice. (Resilience)
 An Ash Dieback programme to screen, monitor and remove diseased trees
commenced in summer 2025, with over 1,000 trees already
surveyed.  (Resilience)
 Work has started onsite to build the £40.8m Comrie Flood scheme designed to
protect 189 homes and businesses. (Resilience)
 We are taking a proactive approach to landslip risk with 39 at risk infrastructure
and greenspace sites identified with inspections underway. We are one of the
only local authorities in Scotland to do this.  (Resilience)
 The number of Perth and Kinross community resilience groups this year has
nearly doubled this year to 63. We have supported them by providing over £220k
in grants, £80k in equipment and training in how to use key tools like box walls.
(Resilience)

Page 6

3. Delivering a fair transition and a green recovery
 We lowered the energy costs for our Council tenants by improving energy
efficiency. There has been a reduction in number of PKC Domestic properties at
EPC Bands E and F achieving and all should achieve EPC Band D or above for
Dec 2025 and increase in properties with EPC Bands B and above.
 The PKC Green Capital Development Grant Fund awarded grants to 31
businesses, 23 of these businesses that have completed their projects and
collectively leveraged an additional £5,241,000 of private investment into the
P&K economy from the £451,000 they received (Business and Industry)
 We developed the legal, planning, design and infrastructure aspects of the
proposed Perth Eco-Innovation Park (PEIP) as a Net Zero exemplar and beginning
to prepare marketing materials for the site (Business and Industry)
4. Preventing an ecological emergency and enhancing biodiversity 
 We are a founding partner for the Leven Landscape Enterprise Network to help
leverage private sector investment to make the Leven landscape healthy and
productive while benefitting the environment, boosting biodiversity and uplifting
local communities.  The Council’s £20k of NRF match funding helped leverage in
£155k of private investment (Land Use).
 With our Nature Restoration Fund (NRF) allocation, 22 projects were funded in
Year 4 to deliver restoration by both the Council and our communities These
include woodland planning, INNS control, farmland biodiversity, pond creation,
pollinator planting, and tree nursery development. (Land Use)
 We are developing Nature Networks for key ecosystems - public engagement in
spring 2025 had over 70 people contributing.   (Land Use)
 We planted over 3,100 trees this year across Council parks and maintained open
spaces that will boost nature, sequester climate and provide amenity for our
residents and visitors. (Land Use)
 We nearly doubled the area managed for our Grow Wild programme to 120ha 
5. Engaging and empowering our children and young people 
 Our 3rd Annual Youth Climate Conference focussed on Green Skills & Careers,
with 90 pupils and teachers from secondary schools engaged (Education &
Engagement). 
 We launched a Schools Recycling Project to invest in internal recycling
resources and fit-for-purpose solutions to improve recycling rates in schools and

Page 7

completed Phase 1 (Bertha Park High and cluster primaries)  (Education &
Engagement). 
 We had successful engagement with schools for energy audits during holiday
shut down. Eight schools were chosen for project. Perth Grammar School
reduced their holiday consumption by 70% compared to the previous year;
Blairgowrie High School managed a reduction of 26% on the previous
year (Buildings and Energy).
 We had successful engagement with pilot eight schools for energy audits during
holiday shut down, with the following year-on-year savings:
 Perth Grammar School - 70% reduction
 Blairgowrie High School - 26% reduction
 We increased the annual number of pupils trained to Bikeability Level 2 by 500
this year, with 2110 P6 and P7 pupils trained. (Transport)
6. Empowering our communities 
 We supported the creation and launch of Climate Connect Perth & Kinross, a
community network, funded by the Scottish Government, designed to bring
together all groups carrying out climate actions across Perth and
Kinross (Education & Engagement)
 We are supporting 12 communities to become Biodiversity towns and villages.
 We supported over 1,638 households with free home energy advice and support
for Council tenants and Perth and Kinross residents;
 We commenced a mattress recycling project in conjunction with PUSH in Perth
using funds from the Recycling Improvement FundIn its first six months of
operation 197 mattresses have been diverted from disposal and have found new
homes.

Page 8

Climate Action Plan Progress
Our Climate Action Plan has 186 actions spread across the eight thematic areas.  The
status of these is shown in Figure 1.  There is a year-on-year improvement when
comparing to September 2024, with five actions moving out of the red category and 17
additional actions moving to green status.  
Figure 1 Full PKC CCSAP Action RAG Status as of 30 September 2025
71,
38%
68,
37%
17,
[PERCEN
TAGE]
28,
15%
Status of CCSAP Year 4 Actions (as of 30/9/25)
Green Amber Red Complete
To ensure that the most important actions were prioritised, the Council designated 25
top priority actions.  These were re-prioritised by Council members in October 2024 The
top priority actions focus on three main areas achieving area-wide emissions reduction,
reducing the Council’s own emissions and building resilience to climate change across
Perth and Kinross. The overall progress of these actions is shown in Figure 2, with
details of the progress of each action detailed in the relevant thematic section. 
Figure 2 Top 25 Priority Action RAG Status (September 30 2025)
11,
44%
14,
56%
CCSAP Status - Top 25 Actions
A
G

Page 9

Challenges and barriers 
Several cross-cutting challenges or barriers applicable to the wider programme delivery
have been identified:
 Shifting and uncertainty of government targets and the associated regulatory
requirements has an impact on the ability to align work and convince others to
act. 
 Resource and skills gap within both the Council and wider supply chain to be
able to scale up at pace to meet Net Zero targets and the lack of trust in the
supply chain following a number of recent scandals around external insulation,
etc.
 Challenges in recruiting and retaining internal staff with the required skills,
knowledge and experience has been time consuming and led to delivery delays.
 Data timeliness and availability is a challenge to understand the effectiveness of
our actions and make appropriate adjustments.  Several of the key datasets have
1-2 year compilation windows. 
 The need to identify and unlock funding opportunities to ensure future targets
are achieved, in an uncertain funding landscape.  This often requires the Council
to have developed projects to a ‘shovel ready’ stage prior to bidding and often
only cover capital costs.  
 The portrayal in the media that climate action does not have popular support.
This is in contrast to the Scottish Climate Survey (2024), which found that 72% of
Scots feel that ‘Climate change is an immediate and urgent problem’ and a
further 13% felt that ‘Climate change is more of a problem for the future’. These
views are even in stronger in Perth and Kinross at 83%/10% respectively. 
In addition to these, specific challenges and barriers for each theme of the action plan
are discussed in the relevant thematic section later in this report. 
Performance 
Seven high-level key performance indicators (KPIs) have been established to give an
overview of the Council’s progress towards net zero.  All KPIs showed year-on-year
improvement. It should be noted that due to the lag of the data sources being
published, the values for the first three KPIs are for 2023. 
Our performance data highlights that while we are trending in the right direction, the
need to accelerate the pace of action to remain aligned to the Paris Agreement and
national targets.

Page 10

Table 1 Year 4 KPI Data 
KPI  Target  Current value  % change over
previous year 
Perth and Kinross Area-wide
territorial greenhouse gas
emissions (kt CO2e - Net) 
75% reduction on 1990
levels by 2030 and zero
net emissions by
2045.   1180 (2023)  -3% 
Perth and Kinross Area-wide
territorial greenhouse gas
per Capita emissions (t
CO2e - Net) 
75% reduction on 1990
levels by 2030 and zero
net emissions by
2045.  
7.7 
(2023)  -4% 
Perth and Kinross Area-wide
CO2 emissions (kt CO2e -
Net) 
376kt CO2e by 2030
(75% reduction on
1990 levels)  634.9 (2023)  -2% 
Perth and Kinross Council
Scope 1,2, and 3 emissions
(t CO2e)  Net zero by 2045 
23,457
(24/25)  16%
Carbon Disclosure Project
(City Score)  ‘A’ by 2024   A (2024)  A
% of Climate Change
Indicators showing positive
change 100% 
75%
(24/25) 
5.6 percentage
points
Climate Change Grant
Funding secured (£k) 
No target set
  £2,234.53
(24/25)  -35%
Perth and Kinross Area-wide territorial greenhouse gas emissions (ktCO2e) 
Figure 3 shows recorded greenhouse gas emissions between 2005 and 2023. This
shows a 3% decrease in emissions year-on-year. This continues the downward trend
experienced since 2005, the first-year comparative data is available.  This decrease
matched the overall Scottish trend. 
While emissions in 2023 continued to decrease we are still significantly above the
estimated trajectory needed to reach Perth and Kinross Council target of 75% reduction
by 2030 and currently we have achieved a 47% reduction on 1990 levels. It is important
to note that as the Council’s climate change action plan was approved in December

Page 11

2021, so any changes attributed to this plan are likely to only minorly be reflected in the
data.
Of our three main emissions categories:
 Transport sector emissions decreased by 1.3%, reflecting a hopeful cap to the
post-Covid-19 emissions rises.
 Land use emissions increased by 2%, while similarly land use sequestrations
(reductions) also increased by 2%.  The increase in sequestration potential was a
positive change as it reversed a three-year decrease.
 Agriculture emissions had been following a decreasing trend, but a slight
increase (0.7%) was recorded for 2023.
There were bigger changes in our small emissions categories with Commercial
emissions decreasing by 12%, Waste emissions by 10%, Domestic emissions by 3%
and wider-public sector emissions also by 3%.
Figure 3 GHG Territorial Emissions for Perth and Kinross, DESNZ 20251 
Perth and Kinross Area-wide territorial greenhouse gas per Capita emissions
(tCO2e) 
As shown in Figure 4, since 2005, per capita greenhouse gas emissions in Perth and
Kinross have been steadily reducing since 2005, with the exception being 2021 (Covid
recovery).  This year there was a 4% reduction.  This is higher rate of decrease than for
the overall emissions due to the fact that the national dataset used showed a
population decrease in 2023 for Perth and Kinross. This per capita emissions decrease
is slightly more than the Scottish average (2.8%)  Scotland,  but we have continued to

Page 12

remain higher than the Scottish average in terms of overall emissions as would be
expected for a local authority with a more rural population. 
Figure 4 Per Capita GHG Emissions (DESNZ, 2025)
Perth and Kinross Area-wide CO2 emissions (ktCO2e) 
This is the CO2 only element of the wider Greenhouse Gas emissions so many of the
sub-categories show similar trends. Figure 5 shows a steady reduction in recorded CO2
emissions from 2005 until the Covid recovery bump in 2020, with an 8% increase in
2021. Emissions decreased again in 2022 and similarly in 2023 with a 2% decrease
compared to 2022 levels. Emission levels are currently 14% higher than they would
need to be on trajectory for a PKC’s current target of 75% reduction by 2030. 
Figure 5 Perth and Kinross CO2 emissions (DESNZ, 2025)

Page 13

Perth and Kinross Council Scope 1,2, and 3 emissions (tCO2e) 
As can be seen in Figure 6, in 2024/25 a carbon footprint of 23,457 tCO2e was recorded.
This shows a significant 16% year-on-year decrease. Progress has been made in all
areas (Transport, Energy use and Waste) reported. The largest emissions reduction can
be attributed to the new residual waste contract that replaced landfill with Energy from
Waste. It came into effect in August 2023, with 2024/25 being the first full reporting year.
There has also been a 2% reduction in electricity consumption, despite the Council’s
increased Internal Floor Area linked with the addition of Perth Museum and Bell’s Sports
Centre. Lastly, emissions arising from the Council’s own fleet have also decreased,
partly due to switching from highly polluting large cars to smaller and greener options,
but mainly, due to using Hydrotreated Vegetable Oil (HVO) as a fuel alternative for
Heavy Good Vehicles (HGVs). The HVO trial for six HGVs throughout 2024/25 drastically
cut overall HGV emissions by 21% compared to 2023/24.
Since 2015/16, the Council has reported its Scope 1, 2 and 3 emissions as part of the
statutory Public Bodies Climate Change Duties Compliance Reporting process and the
emissions reported are as per those annual reports. More information on the Council’s
carbon footprint can be found in the Perth and Kinross Public Bodies Climate Change
Statutory Reporting 2024/25.
Figure 6 Perth and Kinross Council Combined Scope 1,2 and 3 emissions
Carbon Disclosure Project (CDP) City Score 
PKC retained its top ‘A’ ranking in 2024 after we first made the ‘A-cities List’ in 2023. The
CDP City Score is an independently audited assessment of climate action progress to
assist organisations in measuring and managing their risks and opportunities on climate
change. Perth and Kinross Council’s CDP score has been improving since its first

Page 14

submission year in 2019 from a ‘D’ to ‘C’ in 2021, ‘B’ in 2022 and A for the past two
reporting years. Retaining an ‘A’ ranking is important in demonstrating area-wide climate
action leadership, recognising the effort made by PKC to reach its climate objectives. 
Percentage of Climate Change Indicators showing positive change 
71% of the Climate Change indicators show positive change.  This has increased by 5.6
percentage points compared to Year 3, when 65.4% showed positive impact.  In
addition, a further 7.5% have not showed any change due to data availability, mainly, in
relation to gaps in publication dates.
Climate Change Grant Funding secured (£k) 
In 2024/25 the Council secured £ 2,234.53M of Climate Change related grant funding.
This decreased by 35% compared to the amount received in 2023/24.  A significant
percentage of this reduction was due to securing the £2.36M from the Recycling
Improvement Fund which enabled our Twin-Stream recycling transformation in
2023/24. Additionally, there was no funding awarded for Nature Restoration Fund in
2024/25.

Page 15

Governance
Strong climate change governance remains foundational to Perth and Kinross Council’s
ambitions for climate action. Over the past four years, significant progress has been
made embedding climate action into our corporate governance systems, ensuring it is
prioritised in our Corporate Plan and integrated into strategic and financial decision-
making.
Our governance theme focuses on six key areas:
 Accountability
 Business and Performance Management
 Decision Making
 Finance
 People
 Procurement
Highlights
Highlights this year include:
 Digital Carbon Footprint: We started to understand the climate impact of our
data services, with a carbon footprinting exercise undertaken on our Microsoft
Cloud services. Related to this we brought in email retention periods and ran
awareness campaigns to help remove unnecessary data retention.
 Impact and Value Assessment Toolkit: We continued our rollout of our Impact
and Value Assessment Toolkit to enable early identification of climate change,
sustainable development, equalities, finance and legal risks and opportunities
and made it mandatory for all committee reports from January 2026.
 Procurement Innovation:  The Procurement Team are working with Services to
identify pilot projects to include requirements relating to Climate Change. 
Specifically around Climate Change Action Plans within Structures Contracts. 
This will be used a pilot to learn and roll out to other suitable tenders.
 Climate Literacy: We appreciate that Climate Governance needs to start from
the top and have rolled out Climate Literacy training to 52% of the executive
team and senior managers, and continue our focus on elected member climate
literacy now at 70%

Page 16

Delivery
The Year 4 Action Plan identified 24 Governance actions. As of 30 September 2025, 87%
of the actions can be classified as on-track (Green or Amber) in terms of progress.
While Governance actions have a comparatively low resource need with respect to
other thematic areas, there are several challenges linked to changing the culture,
mindset, policies and procedures of a large organisation. These include staff capacity
and prioritisation, appreciation of how climate action relates to a wider number of
services and workstreams, as well as the lengthy processes involved in changing
Council policies and procedures. The wider rollout of carbon literacy training across the
senior leadership due to be completed next year will hopefully help address some of
these challenges.
Procurement is a key area for focus.  While there is ambition within the procurement
team to do more, the delivery is limited due to the constrained resources available
within the Procurement team as a result of increase in workload due to other
Transformation workstreams and a significant increase in contracts this year.
Review of Top Priority Actions
There were two Top Priority Governance actions for Year 4.
Action
Number
Action RAG
Status
Comments
G2 Mainstream climate change:
into committee procedures
and council operations
G From January 2026, completion of the
Impact and Value Assessment Toolkit
which includes Climate Change
Screening has been required for all
committee reports. 
G22 High Emission Category
Strategies
A Sessions planned for using the
Prioritisation Tool to assess risks and
opportunities for identified categories. 
Due to staff capacity, this has been
delayed Q4 25/26 to Q1 26/27.
Outcomes
Positive outcomes as a result of Delivery of the Climate Action Plan Actions include:
 IVA Screening: Between January  and November 2025, 199 papers were
screened, identifying 245 positive climate actions
 Procurement Outcomes: The Flexible framework has been completed and an
action plan completed to bring the organisation to a foundation level across all

Page 17

sustainable procurement criteria.  Categories for the Prioritisation tool have
been identified.  Key Contracts have been identified and work has commenced
on.  
Performance
Progress against Statutory Targets
There are no Statutory targets in relation to Climate Governance, but we are required to
report on our actions, priorities and Climate Change Assessment Tool (CCAT) Overall
Score in relation as part of our Public Bodies Climate Change Reporting duty.
Key Performance Indicators
KPI Previous
Value
Current
Value
Target and comment
% of Members and
senior officers who
have undertaken
Climate Literacy
training
32% 100% of Elected
Members
100% of the Strategic
Leadership Forum by
2026 - 50% 2025
% of staff who have
climate change
included in job
description
71% All non-Education stuff
Climate Change
Assessment Tool
(CCAT) Overall
Score
71% 74% 85% by 2026
Focus for upcoming year
Leadership, Accountability, and Decision-Making
Focus:
 Embedding climate action into all council decision-making processes and
committee procedures.
 Strengthening leadership and accountability for climate governance across the
organisation.
Actions:
 Ensure mandatory use of the Impact and Value Assessment Toolkit for all
committee reports from January 2026, with regular audits to monitor
compliance.
 Monitor and report on the climate impact of key decisions, enhancing
transparency and accountability.

Page 18

 Complete climate literacy training for all elected members and senior officers,
and extend to wider staff group
Workforce Engagement and Capacity Building
Focus:
 Building climate literacy and awareness throughout the workforce.
 Integrating climate responsibilities into job roles and organisational culture.
Actions:
 Update job descriptions to include climate change responsibilities for all
relevant roles.
 Track and report progress on climate literacy training, aiming for 100%
completion among elected members and senior officers by year-end.
 Provide ongoing support and resources to staff to embed climate action as
business as usual.
Procurement and Financial Integration
Focus:
 Aligning procurement practices and financial planning with climate objectives.
 Developing strategies for high-emission procurement categories.
Actions:
 Finalise and implement category strategies for high-emission procurement
areas, using the Prioritisation Tool to assess risks and opportunities.
 Pilot and scale procurement projects that prioritise low-carbon and sustainable
goods and services.
 Advance the development of Whole Life Costing approaches, applying them to
major capital investments and procurement decisions.
 Integrate climate risk and opportunity assessments into financial planning and
budget allocation.
Data Management, Performance, and Reporting
Focus:
 Improving the quality and usefulness of climate-related data and reporting.
 Tracking progress against key performance indicators and statutory
requirements.
Actions:
 Refine data collection and reporting processes, including digital carbon
footprinting and procurement data.
 Launch targeted initiatives to improve climate data quality and availability.
 Use insights from the Climate Change Assessment Tool (CCAT) to identify areas
for improvement and monitor progress towards Council targets.
 Regularly review KPIs, including CCAT scores and staff engagement metrics, to
inform ongoing improvement.
Engagement with Services and Partnerships
Focus:

Page 19

 Extending climate governance initiatives to new Council services and external
partnerships.
 Fostering collaboration and sharing best practice.
Actions:
 Develop a tailored climate governance engagement plan for the Health and
Social Care Partnership (HSCP), including training and toolkit adoption.
 Engage services  in climate governance initiatives, ensuring climate action is
embedded across all operations.
 Foster collaboration across departments and with external partners to drive
innovation and share best practice.

Page 20

Education and Engagement
The Council have committed to improving the education and engagement surrounding
climate change and climate action. This includes extensive training and engagement
opportunities for staff and elected members, close working and empowerment of
community groups and action and providing opportunities and support for local
residents and businesses.
Highlights
Highlights this year include:
 Increasing the number of Elected Members who have completed Carbon
Literacy Training has increased from 42% to 70% and extension for senior
management Carbon Literacy Training to now cover all Strategic Leadership
Forum members (123 people) of which 55% will be trained by the end of 2025.
 Successfully hosting the 3rd annual
Youth Climate Conference focussed on
Green Skills & Careers. This involved 90
pupils and teachers from secondary
and through-schools. 16 different
organisations, businesses and further
education providers represented.
 Completing  Phase 2 of Net Zero Living
Innovate UK funded project to create
the foundations to launch a retrofit one
stop shop. £80k of seed funding
secured with further funding applied for
to move the project forward to a testing
stage
 Support the creation and launch of
Climate Connect Perth & Kinross, a
community network, funded by the
Scottish Government, designed to bring together all groups carrying out climate
actions across Perth and Kinross

Page 21

Delivery
As of 30 September 2025, all actions can be classified as Green or Amber in terms of
progress.   In the Year 4 Action Plan identified two Education & Engagement actions as
top priority. These actions focus on public engagement and empowerment of
community groups; giving young people a voice and resources to tackle actions.
The main challenges associated with delivering Engagement & Education are
communication and collaboration among Council teams. Whilst inter-departmental
teams are working well together, there are still some challenges connecting with
embedding change in schools, school communities and the curriculum. Work to
improve on collaboration and prioritising climate action is underway. There has been a
big up-take in the number of Headteachers attending the Carbon Literacy Training
which sets out clearly how climate action is positively intertwined with improving
buildings and addressing the cost of the school day.
While surveys show that 82% of Perth and Kinross residents think that Climate Change
is an important issue, the efficacy of individual or even Council-level actions can be
harder for many people to appreciate when considering it as a global challenge.  What
has become more apparent this year through wider research and public feedback and
conversations is the need to make it clearer for people how climate actions do not just
reduce emissions but can help people live life well locally.
Review of Top Priority Actions
The Top Priority Actions for Year 4 were: 
Action
Number
Action RAG
Status
Comments
E9 Review school operations
and practices to ensure our
schools lead by example
G Recycling Project underway; Schools
energy improvements continuing with
successful holiday switch-off campaigns;
Eary Years Bikeability project started;
Youth Climate Conference hosted
E13 Deliver community and
householder education and
engagement
G Regular updates of website and socials;
promotion of climate action activities;
delivery and support of fares, litter picks
workshops; close working among PKC
teams; delivery of community-focused
projects and participatory budgeting;
delivery of community energy event

Page 22

Outcomes
Positive outcomes as a result of actions taken under the Climate Action Plan Actions.
 Successful engagement with schools for energy audits during holiday shut down.
Eight schools were chosen for project. Perth Grammar School reduced their
holiday consumption by 70% compared to the previous year; Blairgowrie High
School managed a reduction of 26% on the previous year
 Completion of Phase 2 on Innovate UK Pathfinder Project - Extensive resident
and business engagement on retrofit one stop shop business model and
knowledge hub and creation of scalable processes as part of IUK project
completion.
Performance
Progress against Statutory Targets
There are no statutory targets for the Education and Engagement theme.
Key Performance Indicators
KPI Previous
Value
Current
Value
Target and comment 
% of Members and senior
officers who have
undertaken Climate
Literacy training
32% 47% 100% of Elected
Members
100% of the Strategic
Leadership Forum by
2026 - 50% 2025
% of staff who have climate
change included in job
description
71%  71%  All non-education staff
Climate Change
Assessment Tool (CCAT)
Overall Score
71% 74% 85% by 2026
Focus for upcoming year
The focus on the upcoming year will remain on the roll out of the Schools Recycling
Project. Each school cluster requires a bespoke approach due to the variety within our
education estate. The focus will remain introducing lasting and sustainable processes

Page 23

and resources which will capture recycling through our schools and divert from
disposal.
To compliment the ongoing recycling programme within schools, a closer working
relationship with our ECS colleagues will continue to aid in the adoption of Learning for
Sustainability across the curriculum. Opportunities for collaboration and learning will
be shared to ensure schools can make the most of the expertise that exists within the
Council.
For the wider community, a focus will remain on engagement, particularly through the
Climate Connect platform to champion local actions and sharing good news stories.
Progress will also be sought to be made in refining and launching a retrofit one stop
shop to serve as a catalyst for improving home energy efficiency.

Page 24

Buildings and Energy
Within the Energy and Buildings theme, work against the key themes identified within
the Climate Change Strategy and Action Plan has been progressing over the past year in
relation to:
 Moving forward with actions from the LHEES and LAEP for the wider Perth &
Kinross area
 Improving energy efficiency in housing stock area wide
 Developing a decarbonisation pathway for the Council’s Domestic and Non-
Domestic estate portfolio.
 Progressing energy efficiency and decarbonisation projects using existing budget
allocation.
Highlights
While good progress has been made across the theme, a few highlights of the year
include:
 Supporting over 1,638 households with free home energy advice and support for
tenants and residents by working with SCARF; a new contract has been agreed
that will continue this support to the end of March 2026.
 ECO4 workstream delivering energy efficiency measures utilised ECO Funding of
£3,062,614 and 173 installations with
537 individual measures installed.  
These measures contribute to the
decarbonisation of privately owned
properties across the wider Perth &
Kinross area.
 Completing two major Passivhaus
replacement buildings. These include
Scotland’s first Passivhaus Leisure
Centre - Blairgowrie Recreation Centre
and Perth High School our first
Passivhaus secondary school. The
Passivhaus standard ensures both
quality and energy efficiency are
achieved.  
 Delivery of an initial domestic pilot project looking at the 4-in-a-block archetypes
and potential energy efficiency measures.  Data from these properties will now
be reviewed regularly and used to inform future plans.

Page 25

 At Arngask Primary School, we replaced an inefficient hot water system with a
thermal energy storage unit which utilises innovative phase change material.
This blended £41,052 of match funding through the Public Sector Heat
Decarbonisation with continued use of PKC internal capital funding.
 Working in partnership with Integrated Environmental Solutions (IES) &
Edinburgh University on and InnovateUK funded project to develop and deliver a
decarbonisation toolkit. The project secured £100k of external funding and
showcases the needs and benefits of public/private partnership working.
Delivery
The 2024/25 Action Plan identified 23 Energy and Buildings actions; as of 30 September
2025, 4 (17%) are Complete, 8 (35%) are Green Status, 9 (39%) are Amber status and 2
(9%) are classified as Red. In terms of progress, 91% of the actions can be classified as
Complete, Green or Amber.
Progress on several key area-wide delivery actions from the LHEES and LAEP are
underway including the Heat Network Support Unit funded strategic Heat Network
development and exploration of Strategic Energy Partner.  These actions continue to
support the detailed planning for decarbonising the Council’s Non-Domestic &
Domestic estate.
The main challenges associated with delivering the Energy and Buildings actions are:
 To identify and unlock funding opportunities to ensure future targets are
achieved.
 Resource and skills gap within the supply chain to be able to scale up at pace to
meet Net Zero targets.
 Challenges in recruiting and retaining internal staff with the required skills,
knowledge and experience.
 Uncertainty due to changes in legislation not yet being agreed.  Consultation on
the replacement for EESSH2 – know as the Social Housing Net Zero Standard
(SHNZS) and consultation on the Heat in Buildings Bill both closed in November
2023; and no further guidance has been provided since this time. 
 The Council has limited levers for getting private individuals and businesses to
undertake retrofit within their own properties. To support action, we fund free
home-energy advice, undertake awareness campaigns and have been
developing a One Stop Retrofit Shop.

Page 26

Review of Top Priority Actions
The Top Priority Actions for 2024/25 were:
Action
Number
Action RAG
Status
Comments
B1 Develop and deliver the
Local Heat and Energy
Efficiency Strategy (LHEES)
G Annual report on LHEES taken to CC&S
Committee on 10 November. Good progress
was made on key actions:
- Perth Heat Network
- Strategic Energy Partner
- Estate decarbonisation
- Community energy (Scalable cities)
- Public engagement
B2 Develop and deliver a
programme to ensure all
existing Council houses are
brought up to EPC B by 2032
G Phase 1 of consultancy project with ARUP
was presented on in Nov 2024
Ongoing work programme to ensure
upgrades of all E&F properties by the end of
the year.
Pilot projects are being developed for two
archetypes from the existing housing stock
to trial potential measures to decarbonise
these.
Exploring the possibility to develop rural HN
in hard to decarbonise locations by
combining with non-domestic workstream
B11 Develop options, costs and
funding avenues for PKC
Estate Portfolios to reduce
greenhouse gas emissions
A High level options appraisal provided by
ARUP and investigating more detailed
pathways to reach Net Zero
B13 Develop and invest in local
district heat/communal
heat/electricity networks
where viable which use
alternative non-direct
emissions heat sources 
G Close cross Service working required and
partnership with Community Planning
Partners. Private sector or Aleo required to
deliver/operate heat network. Only Perth
has density/anchor loads for large scale
district heating network
B21 Replace all Oil-fired heating
systems with non- direct
emissions heat source, 
A Utilising existing internal funding up to
2026/27 to undertake initial Non-Direct
Emissions heat source projects. External
SG part-funding has also been secured

Page 27

from Public Sector Heat Decarbonisation
fund in 25/26 for one of these projects. 
Further funding streams to be explored to
undertake additional projects.
Outcomes
The following positive outcomes as a result of Priority Actions include:
 Reduced Scope 1 and 2 emissions by 16% within the Non-Domestic PKC estate
over the last 4 years.  Our upgraded Building Management system software
reduced energy consumption by 3000MWh in year 1. This also produced
financial savings of circa £100,000 and will ensure a return on investment within
3 years.
 PKC have funded over 6,500 households to receive free home energy advice over
the life of the Climate Action Plan. Last year this led to estimated annual bill
savings of £179,216 and £4,760 reduction in fuel debt.
 Successfully delivered pilot project at Auchtergaven Primary school to remove oil
fired heating system and install a non-direct emissions heat source. This
resulted in a reduction in energy consumption of 49 % and improved energy use
intensity of  84 kWh/m2a.
 £100k of Strategic Heat Network Unit funding awarded by the Scottish
Government to procure a partner to deliver heat networks.
 HEEPS-ABS grant funding award of £1,942,800 received from Scottish
Government for 2025/26 for delivery of energy efficiency measures in Domestic
privately owned properties.
 CAN DO Green Heat Retrofit Innovation Challenge funding awarded by Scottish
Enterprise to the value of £50,000 to undertake a Feasibility Study to develop a
project for a pioneering green heat solution.
 Lowering the energy costs for our Council tenants by improving energy efficiency.
There has been a reduction in number of PKC Domestic properties at EPC Bands
E and F achieving and all should achieve EPC Band D or above for Dec 2025 and
increase in properties with EPC Bands B and above.
Performance
Progress against Statutory Targets
There are several statutory targets in relation to the decarbonisation of the Energy &
Buildings theme as follows.
I. 68% reduction in emissions from buildings by 2030 with respect to 2020 levels:
on-track 3.4% reduction in 2024/25 from 2023/24.

Page 28

III. Social housing to be EPC D by December 2025 and EPC B by 2032: on-track
 Increase in EPC Band B and above properties from 7.07% in 2023/24 to
8.05% of housing stock in 2024/25.
 Decrease in EPC Bands E, F & G properties from 3.88% in 2023/24 to
2.55% in 2024/25.
IV. Development of Local Heat & Energy Efficiency Strategies (Strategy & Delivery
Plan) by end of 2023: this target has been met; the final LHEES was presented to
Council and received approval in November 2023.
Key Performance Indicators
KPI Previous
Value
Current
Value
Target and comment
Total area-wide Carbon dioxide
emissions from domestic
sources (kt CO2e
232.6 218.7 
Scope 1 and 2 Emissions from
Non -Domestic Council Estate
(tonnes CO2e) 
9,264 8,976 Annual emissions of 4,396 tonnes
CO2e by 2030
PKC Non-Domestic Energy
Consumption (kWh)
50,481,05
1
48,173,891 Target: 3% year-on-year savings
On-track 3.4% reduction in 2024/25
from 2023/24
Heating oil consumption in PKC
non-domestic estate (kWh)
1,806,3721,532,193 All sites with oil as a heat source to
be removed by 2030

Page 29

Renewable energy generated
across the PKC estate, including
from Low Carbon Heat Sources
(MWh)
2831.08 2599.07 Renewable energy shall be installed
where can maximise production.   
% Council housing meeting the
Energy Efficient Standard 2 for
social housing (minimum EPC
B) 
7.07% 8.05% EESSH2 standards of 100% of
Council Housing to meet EPC B by
2032
Percentage of households in fuel
poverty  
32% 35% 5% by 2040
Annual data has only been
published at a national level - data
has been extrapolated to PKC based
on the ratio of the Scottish to PKC
levels of fuel poverty that were last
both measured in 2019.
Highly linked to energy price cap.
Much of this is beyond PKC control
but demonstrates the importance of
all energy efficiency measures the
council is taking.
Percentage of households in
extreme fuel poverty  
27% 28% 1% by 2040
Number of P&K households
provided with energy efficiency
and/or low carbon heating
advice (PKC funded)
2205 1638 1290 for 2024/25
Focus for upcoming year
The focus for the upcoming year is the delivery of the actions in the plan that will
include the following:
 Selection of a Strategic Energy Partner and working with them on the continued
development of a Perth City Centre heat network and wider decarbonisation
priorities.

Page 30

 Provide a detailed and prioritised decarbonisation plan for the Council’s
Domestic and Non-Domestic Estate; plan should take into account lessons
learned from pilot project delivery.
 Work toward targets indicated in aforementioned Corporate Key Performance
Indicators (KPI).
 Undertake statutory duty in relation to public sector Non-Domestic buildings and
the compilation of Building Assessment Reports (BAR) in accordance with Heat
Network Regulations.
 Continue our work to replace all oil-fired boilers within our estate.
Two new actions have been added into the Climate Change Action Plan for next year.
Firstly, to develop rural heat networks at sites beneficial to PKC’s domestic and non-
domestic estates, recognising the potential efficiencies by addressing both together in
locations where the Council has clustered domestic and non-domestic buildings. The
second new action is to develop a programme of sites under PKC ownership for
renewable energy generation. This will help the Council lower its emissions and
maximise its potential energy returns.

Page 31

Transport
There continues to be ongoing work across the Council and through collaborative work
with partners to deliver on key themes of the Climate Change Strategy:  
 Increasing active transport
 Accelerating the EV transition 
 Improving public transport provision 
 Reducing vehicles in town centres 
 Ensuring resilient transport systems 
However, the collective action from interventions delivered both by the Council and
external bodies has not led to the targeted transport emissions reduction in Perth and
Kinross, which remain significantly off track.
Highlights
Highlights this year include:
 Fleet: Good progress has been made with Refuse Collection Vehicles, which
have started using Hydrotreated Vegetable Oil (HVO) and all RCVs will be using
HVO by the end of 2025. A business case has been developed for phased
addition of electric vehicles to the pool car fleet.
 Public Transport: The Transport Transformation Project has commenced, a 3-
year project which will set the strategic direction for public transport and
propose a new model for in-scope transport by March 2027, including public bus
service provision, transport for school, health & social care & looked after
children, plus communications.
 Community transport: PKC has disposed of 6 Council minibuses to Community
Groups in Perth and Kinross to support them with the transport requirements of
their group.  In addition, PKC has long term loaned three 8-seat Multi-Purpose
Vehicles to rural community transport groups in Kirkmichael, Muthill and
Aberfeldy to enable them to provide local solutions to their community’s public
transport needs.   
 Reducing vehicles in town centres: A study has been completed for Perth
Circulation Plan. It outlines how city centre roadspace could reallocated in a
coordinated way to reduce through traffic and deliver connected sustainable
transport network improvements, including a new cycle network separated from
traffic.

Page 32

 Public Electric Vehicle Chargers: PKC and Angus Council secured £1.1M funding
from Transport Scotland for EV charging points. A private operator will be
appointed to install 64 charging points over 3 years across PKC (in urban and
rural areas). They will also take over operating our public EV charging network.
 Air Quality: Crieff Air Quality Management Area was revoked in December 2024
and a 5-year Air Quality Action plan was approved in August 2025.
Delivery
The Year 4 Action Plan identified 32 Theme actions that are still live, with a further 6
completed. As of 30 September 2025, 69% of the live actions can be classified as Green
or Amber in terms of progress. 
The main challenge associated with delivering transport emissions reductions are: 
 delivery of larger scale sustainable transport capital projects are dependent on
securing external funding from Transport Scotland.  This has the specific
challenges are that funding governance and access arrangements are still in flux,
funding awards are now usually mid-way through the financial year or later, and a
lack of multi-year funding awards. All funding is single year, whereas many
infrastructure projects take multiple years to deliver
This creates challenges for programming, resourcing and delivery
 General mismatch, across the public sector, between the pace and scale of
proposed interventions (and associated resources) required to hit transport
emissions reduction targets and those that are being delivered.
 Delays at a national level with introducing proposed high impact measures, such
as transitioning vehicle excise duty into a per mile driven charge
 Nervousness to propose and deliver the challenging interventions needed to
achieve transport behaviour change by the public which limit car use in the short
term
 Lack of focus on the importance of 2030 climate targets and associated urgency
required.

Page 33

Review of Top Priority Actions
Progress against the Top Priority Actions for Year 4 is summarised as follows:
Action
Number
Action RAG
Status
Comments
T10 Transition Council vehicle
fleet to
electric and alternative fuels
G Good progress is being made in line with
the Fleet Decarbonisation Strategy 
T18 Investigate options for new
Park & Ride sites
A Land secured through planning process.
Developing strategic business case for
new park & ride sites, alongside review of
existing Park & Rides site usage
T3 Develop a new Active Travel
Strategy
A Lead Officer for the Mobility Strategy has
begun development, progress had been
delayed while this post was vacant
T32 Develop a new Public
Transport Strategy
G The Council’s Transport Transformation
Project has commenced and will deliver
on this action, reporting in March 2027
T7a Deliver the Council-wide EV
Charging Expansion
Programme
G Secured funding to install further 95
charging points over the next 3 years.
Private operator of our charging point
network to be appointed, who will be able
to install more at their discretion
Outcomes
Positive outcomes as a result of delivery of the Climate Action Plan Actions include:
 Estimated annual CO2 emissions savings of c750-1000 tonnes per year from
Refuse Collection Vehicle fleet transition to using hydrotreated vegetable oil
instead of diesel, reducing Fleet emissions by approximately 4%. 
 £1.9M secured from Transport Scotland Electric Vehicle Infrastructure Fund
(EVIF) for Perth & Kinross Council and Angus Council to install electric vehicle
charging points.
 £680,000 funding secured from Transport Scotland Bus Infrastructure fund for
bus infrastructure and bus priority on South Street, Perth and design of
multimodal corridor improvements along Dunkeld Road

Page 34

 Received £193,000 from the Scottish Government Air Quality Grant for 25/26
projects.
Performance
Progress against Statutory Targets
Previously there had been a 75% transport emissions reduction target and a 20%
vehicle mileage target, both by 2030.  In 2024 the Scottish Government agreed to
remove these, but the replacement targets have not yet been put in place.
Key Performance Indicators
KPI Previous
Value
Current
Value
Target and comment
Perth and Kinross
area wide carbon
territorial dioxide
emissions (ktCO2e)
498.3 493.8
(2023)
Target of 158kt CO2e based on 75%
reduction in transport emissions by
2030 in relation to 1990 levels.
With a 1% annual reduction, this KPI
remains significantly off-track.  The
Council has many levers, but limited
direct control over transport
emissions.
Total car kms
(millions)
1759.4 1824 Target of 1,496 – a 20% reduction on
2019 levels by 2030
Number of public EV
charging devices
50kW and above
78 87 
Public EV charging
devices per 100,000
population
125.5 133.9 
% Council fleet
vehicles that are
electric or other zero
direct carbon fuel
technologies  
4% 4.45 %
Number of
exceedances of
1 1

Page 35

Scottish Air Quality
Strategy Objectives
in Perth & Kinross
Focus for upcoming year
The first focus for the upcoming year is to complete priority plans and strategies as
outlined in the Climate Change Action Plan, namely an Active Travel Strategy and
Corporate Travel Plan. The proposal for Perth Circulation Plan will also be finalised
along with a review of Park & Ride provision. A strategic approach for behaviour change
interventions to encourage uptake of sustainable transport options will be developed,
to focus existing funding on the most impactful interventions. Also transport theme KPIs
will be reviewed, in parallel with developing the monitoring and evaluation framework
for the Mobility Strategy.
In terms of delivery, it is anticipated that the first elements of the Perth Circulation Plan
will begin to be delivered, though there are risks associated with political and public
approval which could delay the project. In addition, new electric vehicle charging points
will be installed as part of the 3-year programme and it is expected more electric and
HVO-run vehicles will be introduced into the PKC Fleet.
The priority actions for next year include: 
 Develop a Perth and Kinross Active Travel Strategy
 Develop a PKC Corporate Travel Plan
 Develop and implement Phase one of the Perth Circulation Plan

Page 36

Circular Economy and Waste
The Council has continued to work with Householders, Communities and Businesses to
promote the services provided whilst raising awareness of recycling and reduction
opportunities. Key action areas include:
 Circular Economy Strategy
 Circular Economy Business Opportunities
 Schools Recycling Project
 Operational Asset Review
Highlights
Highlights this year include:
 Circular Economy Strategy: Circular Economy Consultation document and
Waste Management Plan Final update were drafted and are due to be presented
to Climate Change and Sustainability Committee in February 2026.
 Circular Economy Business Opportunities: Work has been underway in
relation to the Clean Growth Axis, a digital project development support platform
founded on agreements with key statutory agencies, industry organisations, and
academia; Project Beacon is progressing the development of an advanced
plastics facility; and a further Circular Economy Business engagement session is
due November 2025.
 Schools Recycling Project: Confirmation to commence the Recycling in
Schools Project with £103k approved budget and a dedicated fulltime Officer to
undertake this to 2027. The first 2 clusters of Bertha Park & Crieff High School,
(along with the inclusion of Perth High school) are well underway. The focus
being to improve the recycling infrastructure in PKC learning establishments and
to promote positive behaviours with staff and pupils.
 Operational Asset Review: Conclusion of the Operational Asset Review – Phase
2 establishing the impact on waste & recycling collection services of depot
rationalisation options, understanding the impact on the number of collection
resources required to complete collections across the authority area to
determine the viability of each scenario.

Page 37

Delivery
The Year 4 Action Plan identified 17 Theme actions. As of 30 September 2025, 100% of
the actions can be classified as making progress - with 7no.  Green, 6no Amber and 3no.
complete.
The main challenges associated with delivering the circular economy and waste CAP
actions include:
Policy uncertainty: Whilst some national priorities and implementation dates have
been agreed (Digital Waste Tracking and the re-instatement of the Deposit Return
Scheme - DRS), there is still much uncertainty relating to the impact of these policies
on Perth and Kinross Council waste and recycling operations, and the services that we
provide.  Similarly, a number of national policies have yet to be determined including: a
new code of practice for household waste and recycling services (which may include
statutory targets); a review of food and organic wastes; a review of textile recycling, and
the introduction of the Emissions Trading Scheme to energy from waste facilities. 
Energy from Waste facilities: The ban on landfilling biodegradable municipal waste
comes into force from the 1st of January 2026. The industry is experiencing a gap in
energy from waste processing capacity in Scotland and this presents a risk of non-
compliance with the ban for local authorities and waste management companies alike.
SEPA has announced that there will be some flexibility in enforcement, but
nevertheless, officers are taking steps to ensure that PKC is fully compliant with the
ban.
Public engagement: there is more to be done to help members of the public
understand how they can engage correctly with the waste and recycling services that
we provide, and to ensure that these services are simple, easy to understand and are
accessible to all members of society.
Review of Top Priority Actions
The Top Priority Actions for Year 4 were:
Action
Number
Action RAG
Status
Comments
W2/W20Establish a baseline for
the Circular Economy
Route Map, work with the
Resource Management
Association Scotland
(RMAS) to decarbonise
and liaise with the
G Good progress is underway engaging
with businesses and organisations to
establish Circular Economy working.

Page 38

Business & Industry
Group
W8/W21Ensure alignment with
Scottish Government
Legislation and Climate
Change Route
Map/Develop a Waste &
Circular Economy
Strategy to align with the
Circular Economy Bill
G Draft PKC CE Strategy reflects the
priorities and timelines as detailed in
the Scottish Governments CE Route
Map, will be developed once national
updates are announced.
W16 Development of a
Resource Management
Plan for Education &
Children’s Services
G The Recycling in Schools Project
commenced in 2024/25 with bins
being delivered to the Bertha Park
cluster September/October 2025,
with the next cluster phase Crieff
being late 2025, this is being
complemented with education and
awareness sessions.
W17 Asset Management
Review of Waste &
Recycling Infrastructure
Complete The project is now complete,
however, there is an expectation that
further work will be required of a
detailed Depot and Waste Transfer
Station Feasibility to consider the
implications of each short-listed
infrastructure rationalisation option.
Outcomes
Positive outcomes as a result of Delivery of the Climate Action Plan Actions include:
 With the twin stream roll out now having been in place for a full year,
contamination rates for both grey (container mix) and blue (paper/card) are 14%
and 3% respectively for 2024 continuing to be lower than before the service
commenced at 19%, signifying positive engagement. This has also resulted in
£200k of additional income for the Council.
 PKC received funding through the Recycling Improvement Small Grant Fund of
£24,873 grant money which resulted in the commencement of the mattress
recycling project in conjunction with PUSH in Perth. Since its introduction in
March 2025 197 mattresses have been diverted from disposal and have found
new homes up to 29th August 2025.

Page 39

 Stich It, Don’t Ditch It Event, held in September 2025. Mary V Morton and Jeanna
Wigger interacted with an audience of 21 following the launch of their recently
released book, detailing a simple guide for hand-sewn repairs and question and
answer session. Along with this other repair and reuse projects being undertaken
in the Perth & Kinross area were discussed.
 Litter picking event held in the North Inch Community Campus in April 2025
recognising the work undertaken by 37 litter picking hosts and volunteers
keeping our communities' litter free. This was a well-attended event with a
speaker from Keep Scotland Beautiful addressing local and national issues with
lively discussions.
 Issuing additional Food Waste Hubs, resulting in a further 585 Perth City Centre
households having access to the food waste service.
Performance
Progress against Statutory Targets
There are several statutory targets in relation to the decarbonisation of the Waste
Theme sector as follows.
The target of 60% of household waste by 2020 progressing to 70% of municipal waste by
2025 was dropped by the Scottish Government in 2024, however a record of this figure
is still retained for 2024, this is awaiting verification.

Page 40

Key Performance Indicators
KPI Previous
Value
Current
Value
Target and comment
Perth and Kinross
area wide territorial
carbon dioxide
emissions (ktCO2e)
84.7 76.2
Whole Life Cycle
Emissions for PKC
Collected Waste (kt
CO2e)
135.6 131.65
Total household
waste generated
(tonnes)
71373 71804 Variable annually
Total household
waste landfilled as
% of all household
waste
27.1 6 5% by 2025
Significant improvements due to new
residual waste contract
Total household
waste
recycled/composted
as % of all
household waste.
51.7 50.9% 70% by 2025
Note this KPI target has been
removed by the Scottish Government.
% of households
with access to food
waste collection
80.9 83.6 82.2% of households
Quantity of food
waste collected in
residual waste
(Kg/HH/week)
1.67 1.06 Reduce food waste by 33% from the
2013 baseline by 2025
(1.86kg/HH/week)
% Residents
satisfied with their
local refuse
collection service 
82.3 82 At least 90% per year
% of households
served by twin
stream recycling 
94.6 94 98% of PKC households by 2025
Expansion has happened to some
new build and rural areas, but bins
have been removed in some areas
with high contamination
Grey Bin Recycling
contamination rate
(%) (Changed from
DMR)
16.05 14.26 Remain under 20%

Page 41

Focus for upcoming year
The focus for the upcoming year
 Finalise the Circular Economy Strategy following consultation.
 Textiles Communications Plan – Work ongoing to highlight the carbon impact of
textiles and to raise awareness of the wider environmental impacts.
 Food Waste Action Plan - continue the work started this year with the focus for
the rest of the year promoting recycling, with 2026 highlighting reduction.
 Packaging Extended Producers Responsibility (pEPR) projects delivery, which
includes the procurement of a digital reuse platform to work with businesses and
third sector organisations to encourage reuse and repurpose, embracing a
circular economy, achieving best use of assets and reducing our carbon
footprint.
 Digital Waste Tracking – due to commence in 2026, this aims to bridge the
information gap with mandatory waste tracking, tracking waste from origin to
destination, tackling illegal behaviour which threatens retaining resources in use
for longer and the quest for a circular economy.
The priority actions for next year include:
 W2/20 - Engagement with businesses and organisations will continue through
2026 to develop Circular Working with local industry, including participation with
the Tay Cities Region Deal.
 W16 - Continuation of the Recycling in Schools Project
 W5 - DRS – Work will commence in 2026 to determine the potential impact for
PKC ahead of the October 2027 implementation.
 W11 & W19 - Commencement of the Good Food Nation Strategy in early 2026.

Page 42

Business and Industry
Emissions from business and industry is an area that the Council has limited direct
influence over but can play an enabling and influencing role. On a positive note, overall
GHG emissions from industrial and commercial sources in Perth and Kinross are
reducing. Our work this past year had a significant focus on collating information,
targeting key emitters and broadening the membership of the group to include some
top 100 businesses.
Key actions included: 
 Collating information on carbon reduction plans from key employers and
inserting data onto our ‘Top 100’ companies database and CRM system; 
 Promoting joint strategic projects with the Transport Group to decarbonise
transport especially on electric and hydrogen vehicles; 
 Promoting joint strategic projects with the Building and Energy Group to
decarbonise buildings;
 Refreshing the group to include several co-optees from industry including SSEN,
Stagecoach and Highland Spring to ensure that the group can remain in touch
with challenges that businesses face 
Highlights
Highlights this year include: 
 Developing the legal, planning, design and infrastructure aspects of the
proposed Perth Eco-Innovation Park (PEIP) as a Net Zero exemplar and beginning
to prepare marketing materials for the site
 Identifying and
promoting green job
opportunities with key
employers and their
supply chains
 Assessing the
implications of the UK
Modern Industrial
Strategy and the focus
and funding available for
energy transition

Page 43

Delivery
The Year 4 Action Plan identified 17 Business and Industry Actions. As of 30 September
2025, 5 are Green, 11 are Amber, and only 1 was Red.
The main challenges associated with delivering the Business and Industry theme are: 
 Engagement with smaller businesses for whom current economic conditions
are not favourable in terms of costs of materials and pressures caused by
increased energy prices.
 The lack of available incentives in terms of support from UK Government or
Scottish Government grant schemes for energy efficiency or renewables
generation 
 The need to present a coordinated approach across the Council in terms of
services supporting businesses.
 The need to attract more businesses to the area with a focus on energy transition
and Net Zero.
Review of Top Priority Actions
There was one Top Priority Action for Year 4 from the Business & Industry Theme: 
Action
Number
Action RAG
Status
Comments
B14 Develop Perth West and
Perth Eco Innovation Park
as a national Net Zero
exemplar for
decarbonisation of transport
and energy
A Design works for access and
infrastructure/services to the site are
well progressed.  A Masterplan for the
site is scheduled to be completed this
month in preparation for a further
planning application and Heads of
Terms for transfer of the land to the
Council are nearly completed. 
Marketing work to attract business to the
site is in preparation. 
Outcomes
Positive outcomes as a result of Delivery of the Climate Action Plan Actions include:
 Continued decrease in CO2 emissions from business and industry. 
 In 2024/2025, 23 businesses have benefited for an amount of over £451,000
from the PKC Green Capital Fund financial support. There are an additional 8
businesses with ongoing projects with an additional £142,000 of Green Capital

Page 44

Fund support committed.  This has leveraged an additional £4,600,000 of
investment into P&K
 Positive engagement with larger businesses who have now joined the group with
a willingness to share ideas and explore new opportunities
Performance
Progress against Statutory Targets
There are no overarching statutory targets in relation to the decarbonisation of the
Business and Industry sector as follows, but many sectors and industries have set
targets.
Key Performance Indicators
KPI Previous
Value
Current
Value
Target and comment
Number of registered
businesses in energy
(including renewables)
growth sector
140 145 +10% per year
% of businesses (250+
employees or largest energy
demand (+0.5M) with a set
target for reducing carbon
emissions
17% 17% 100% by 2027
Number of businesses
supported through PKC
Green Recovery Capital
Fund
22 31 20 per year
Focus for upcoming year
The focus for the upcoming year is:
 To continue to engage with business and industry through co-optees to the
Group so that it can benefit from ‘real world’ experience and tackle challenges
that all businesses face in tackling Net Zero.
 Target work areas around priority sectors in terms of CO2 emissions. 
 Provide further support to smaller businesses to help reduce emissions, tackle
continuity and resilience issues and ensure local businesses are prepared for the
effects of climate change.
 Assess opportunities for new projects and funding linked to energy transition and
Net Zero.

Page 45

 Focus on agricultural and estate businesses to assist them in meeting climate
targets; promote sustainable farming and land management practices; and
realise opportunities for renewable energy
The priority actions for next year include: 
 Developing the planning permission and marketing of the PEIP site to the
commercial sector to help attract eco-oriented businesses.
 Launch of the Clean Growth Axis - This is a digital support platform to facilitate
the growth of sustainable industries in PKC through agreements with statutory
bodies, academia, and industry organisations. Two projects are being trialled
through the process before formal launch in March next year.
 Continuing to track and record on the Top 100 companies database those that
have carbon reduction and resilience plans and explore support available for
those without.

Page 46

Land Use
Land use including agriculture is responsible for over half of Perth and Kinross’s GHG
emissions 53%, as well as acting as a large carbon sink in Perth and Kinross and
removing 42% of the GHG’s produced.  It is the area that we have the least direct
control over and most limited levers of change, but also critical to achieving our climate
ambitions.
  
Within Perth and Kinross Council, work against the key land use themes identified in
the Climate Change Strategy has progressed over the past year in relation to:
 Strengthening Planning 
 Rural Land Use and Carbon Sequestration
 Biodiversity
 Greenspace
Highlights
Highlights this year include:
 Nature Restoration Fund  £278k was awarded in 2025, with additional
underspend funding available. Of 44 applications totalling £638k, 22 projects
were funded. These include surveys, woodland planning, INNS control, and
farmland biodiversity. Other activities involve bioblitzes, pond creation,
pollinator planting, ranger rope training, and tree nursery development.
 Leven LENS Leven LENS partnership agreements were signed in 2025.  Our £20k
investment helped leverage in additional £155k of private funding to the Leven
Catchment for  improving in-field and edge measures: autumn cover crops,
wildflower/grass planting, new hedgerows, and riparian/tree planting near rivers
like Gairney Water.
 Nature Networks Public engagement in March–April 2025 identified nature-rich
sites for mapping. Using the AECOM tool, initial woodland, grassland, and
wetland corridors were created across Perth and Kinross. These outputs need
manual refinement. A prioritisation framework will guide new corridor mapping,
starting with woodland and expanding to other habitats.
 LDP3 The LDP3 Evidence Report was returned to the Council due to insufficient
Education data and lack of clear timescales for some themes. A revised report
will go to Council on 10 December 2025 and be submitted to DPEA by year-end.
Policy preparation and SEA work continue, with stakeholder engagement
planned for early 2026.

Page 47

 Biodiversity Towns and Villages The project continues to work with existing
communities. Inchture held a biodiversity mapping session in September and is
becoming a Biodiversity
Village, with Abernyte
showing interest. The
Caring for Biodiversity
Project supports
approximately 15 care
sites with pollinator,
swift, and bat
improvements. Work is
progressing with the
greenspace team and
new officers. 
Delivery
The Year 4 Action Plan identified 20 Land Use actions. As of 30 September 2025, 90% of
the actions can be classified as Green or Amber in terms of progress. 
The main challenges associated with delivering Land Use actions are: 
 Resource constraints (both financial and operational) 
 Balancing strategic planning with on-the-ground delivery
 Staff capacity and continuity with key roles undergoing transitions 
Review of Top Priority Actions
The Top Priority Actions for Year 4 were:
Action
Number
Action RAG
Status
Comments
L24 Review and revise our
Forestry and Woodland
Strategy (FWS) as part of
LDP3 process. Consider
how the FWS can support
and encourage private
landowners to plant “the
right tree, in the right place”
to help tackle the climate
change and biodiversity
crises.
G FWS under development - intention to
bring this to E&I Committee in Jan 26

Page 48

L25 Undertake an Open Space
Audit and produce an Open
Space Strategy
A A survey of over 500 open spaces has
been completed to inform the Open
Space Quality Audit. Key sites have been
assessed, with smaller sites to follow.
Strategy drafting will begin after audit
completion, supported by policy review
and engagement analysis. Area strategies
are being developed for LDP3.
L1 Work with Perthshire Nature
Connections Partnership to
identify and develop
landscape scale pilot
projects with partners.
A In early 2025, PNCP supported Nature
Networks engagement and strategic
planning. The River Almond Headwaters
Project is no longer a focus, and
developer contribution work is paused.
PNCP’s Conservation Officer retires in
November; recruitment is underway. A
Species Rich Grassland funding bid is
progressing. Partnership support and
events continue.
Outcomes
Positive outcomes as a result of Delivery of the Climate Action Plan Actions include:
 PKC has received £189,000 from the Scottish Government’s Nature Restoration
Fund for the 2025-2026 funding cycle. Received both revenue and capital
funding for the first time, enabling broader project delivery.
 Current progress on 42% of Local Biodiversity Action Plan actions (up from 25%
last year).
 Continued reduction in chemical weedkiller use, especially in cemeteries.
 Wildflower, bulb, and tree planting underway; community-led site improvements
ongoing.
 Local Nature Conservation Site assessments progressing well, with consultation
planned for Q1 2026.
 Tree Planting Strategy prepared for committee in Q1 2026.
 Leven LENS partnership agreements signed and first round of trades agreed for
10–15 farms, with PKC directly funding £20k to four farms.
Progress against Statutory Targets
There are several statutory targets in relation to the decarbonisation of the Land Use
sector as follows. 
The Scottish Government has set several statutory targets related to land use.  These
are mainly at a national level rather than at a local authority level.  However, local
authority action will be required to meet these targets.
The national targets include:
 Creation of 18,000 Hectares of new woodlands annually by 2032.

Page 49

 250,000 Hectares of peatland restored by 2030 – Perth and Kinross has
approximately 10% of Scottish peatland.
 At least 20,000 Hectares of peatland restored annually by 2032.
Key Performance Indicators
In the latest data (2023) Land Use Land Use Change and Forestry (LULUCF) accounted
for  33% of the total area-wide greenhouse gas emissions (667.3kt CO2) while it was
responsible for sequestering 42% of total GHG emitted (-844.1kt CO2e), leaving a Net -
176.8kt CO2e). Agriculture accounted for 35% of total area wide greenhouse gas
emissions (414.4 kt CO2e).  There was a 0.9% increase in agriculture emissions
between 2022 and 2023.
KPI Previous
Value
Current Value Target and comment
% Of the total land area
and total number of
hectares of Perth and
Kinross covered by
woodland (including
subset breakdown)  
99,220
18.5%
103,861
19.6%
National target to increase
forest and woodland cover
to 21% of total area of
Scotland by 2032
Total area-wide LULUCF
greenhouse gas
emissions (ktCO2e)
675 667.3 To increase the woodland
carbon market by at least
50% by 2025  
Total area-wide LULUCF
sequestration carbon
dioxide emissions
(ktCO2e)
-834.4 -851.9 
Total area-wide
agriculture greenhouse
gas emissions (ktCO2e)
411.5 414.4
Amount of land
protected for nature
within Perth and Kinross
council Boundary 
33.5% 19.2% Protect at least 30% of
Scotland’s land for nature
by 2030
decline due to an error
calculating the baseline
value. This double-counted
sites with multiple
designations. Local
Biodiversity Sites have not
been included as they are
still to be confirmed.
Number of trees planted
on Council land and
maintained open
space  
2,512 3,182

Page 50

Number of community
volunteering hours in
biodiversity related
projects  
1786.5 1934 
% of PKC's Local
Biodiversity Action Plan
Actions that are on track
or completed
25% 42% By 2032, the natural
environment and
landscapes around us will
have undergone significant
restoration, with a
sustainable land use system
that prioritises nature and
biodiversity
Area grassland
managed by PKC for
biodiversity
improvement objectives
(ha)  
21.7 66.27
Focus for upcoming year
Actions this year will primarily focus on the following work:
 Complete site survey programme for Local Nature Conservation Sites and
undertake public consultation.
 Finish mapping our Nature Networks using a prioritisation framework for
woodland, grassland, wetland, peatland, and heathland habitats.
 Monitor and support delivery of the 22 Nature Restoration Fund projects and
allocate the 26-27 Nature Restoration Funding.
 Continue to support Leven LENS project with funding and explore expansion of
the scheme to additional farms. 
 Submit revised LDP3 Evidence Report to DPEA following Council review in
December 2025
 Advance the Forestry and Woodland Strategy (FWS) with draft going to
committee early 2026.
 Apply SFRA findings and SEA checklist to ensure flood-safe site selection in
LDP3.
 Complete Open Space Quality Audit, including site visits to ~200 smaller sites.
 Draft Open Space Strategy based on audit results and engagement analysis.
 Progress Green Network planning, focusing on active travel routes and Nature
Networks linkages.
 Roll out Tree Planting Strategy, aligning with ash dieback and tree management
policies.
 Continue Grow Wild programme, including planting, community engagement,
and machinery trials. Support new biodiversity officers in delivering
communications and site improvements through 2027.

Page 51

Climate Resilience
The climate is already changing in Perth and Kinross – precipitation patterns have
started to alter; temperatures have risen, and more extreme weather events have been
occurring. PKC’s Climate Risk and Opportunity Register identifies the highest risks
linked damage from flooding to houses, businesses, and bridges and other
infrastructure and the wider disruption this causes. The other top risks relate to the loss
of nature, biodiversity and ecosystems and the wider impacts these losses bring. 
The Council is working to build resilience to these risks and wider risks and adapt to the
current and expected climatic changes.  The Council’s climate resilience and
adaptation work has progressed in relation to the five key areas: 
 Resilient organisations 
 Resilient and empowered communities 
 Resilient ecosystems 
 Resilient infrastructure 
 Flood risk management.  
Highlights
Highlights this year include:
 Work on the Comrie Flood Scheme has started on site – work is due for
completion in autumn 2026. With the scheme measures have been taken to
protect and enhance biodiversity and engage with the local community including
the use of localised nature-based solutions, such as root wads and allowing
community benefit projects to choose the scheme vegetation. 
Comrie Flood Protection Scheme Construction Progress: Water of Ruchill
Rootwads

Page 52

 Climate Ready Tayside was launched together with Angus and Dundee Councils
in spring 2025. This new regional adaptation
partnership will address cross-boundary risks
and share best practice. Three stakeholder
working groups have launched to focus on Nature
Based Solutions, Communication and
Engagement, and Health and Community Resilience. 
 An Ash Dieback programme to screen, monitor and remove diseased trees
commenced in summer 2022, with over 1,000 trees already surveyed. 
 For the first time this year, we took a proactive approach to landslip risk with 39
at risk roads and greenspace sites identified with inspections underway. We are
one of the only local authorities in Scotland to do this. 
 The number of Perth and Kinross community resilience groups this year has
grown this year to 63. The Council has supported them by providing over £220k in
grants, £80k in equipment and training in how to use key tools like Box walls; all
to help support the important work these groups do.  
Delivery
The Year 4 Action Plan identified 33 Resilience actions. As of 30 September 2025, just
over half of the actions (51.5%) of the actions can be classified as fully on track with
another 38% showing some positive progress (Amber actions). There were two (6%) red
actions for this theme – both are due to staff capacity.
There are several challenges associated with delivering Resilience actions. Resourcing
is a key challenge – most notable the lack of clarity from the Scottish Government over
the funding of flooding schemes impacting on delivery of both Cycle 1 and 2 schemes.
There are also significant costs linked to implementing scour protection and addressing
ash dieback. On the staffing side, both staff capacity and available technical skillsets
are limiting delivery. 
Building individual and community ownership for resilience is another challenge. While
the Council has significant role to play, especially through the delivery of key schemes,
we also need individuals to play their part. This both by taking property level action and
also for large landowners to be managing their land to promote wider resilience. These
complementary scales of action are needed to minimise the risk that anyone in Perth &
Kinross will experience the devastating impacts associated with flooding or other
extreme events.

Page 53

Review of Top Priority Actions
The Top Priority Actions for Year 4 were:
Action
Number
Action RAG
Status
Comments
R12 Develop and implement
scour protection programme
for key Council assets
G Scour assessment programme is
ongoing, with several high-priority road
bridge scour mitigation schemes now
identified. These have been added to the
already substantial backlog of works
facing the team.
R24 Continued delivery of Flood
Risk Management Cycle 1
Projects and commence
Cycle 2 projects
A Positively Comrie Flood Protection
Scheme has commenced construction
and there were several new studies
commencing throughout 2025, but South
Kinross was delayed by the need to go to
a Local Authority Hearing (October 2025)
and uncertainty over Scottish
Government funding is delaying wider
scheme delivery.
R20 Support community
resilience groups to build
proactive resilience
G Number of community resilience groups
has nearly doubled to 63. We gave out
£220k grant funding and £80k equipment
and are working on developing a
vulnerable persons register.
Outcomes
Positive outcomes as a result of Delivery of the Climate Action Plan Actions include:
 Improved public safety and protection of public and private property through
taking action on flooding, scour and ash dieback.
 The Scottish Government awarded Climate Ready Tayside £51k for delivery of
Year quick wins in 2025/26.
Performance
Progress against Statutory Targets
Flooding is one of the main physical climate risks to Perth and Kinross. Under the Flood
Risk Management Act 2009, we have a duty to deliver Flodd Risk Management Plans
and report on our progress every three years. In November 2025, we assessed 70% of

Page 54

the PKC actions in the flood risk plan are completed or on track. The next progress
report is due in 2028. 
Under the Climate Change (Scotland) Act 2009, Perth and Kinross Council has a legal
duty to contribute to the delivery of the Scottish National Adaptation Plan 3 (SNAP3)
and its objectives. SNAP3 does not include specific targets applicable to local
authorities, however, it does set the target for there to be regional adaptation
partnerships across all of Scotland by 2029. As a Council we have a duty to take action
to contribute to SNAP’s five outcomes: 
1. Nature connects across our land, settlements, coasts, and seas. 
2. Communities are creating climate-resilient, healthy, and equitable places. 
3. Public services are collaborating in effective and inclusive adaptation action. 
4. Economies and industries are adapting and realising opportunities in Scotland’s
Just Transition. 
5. Scotland’s international role supports climate justice and enhanced global
action on adaptation. 
Key Performance Indicators
KPI Previous
Value
Current
Value
Target and comment
Annual Scotland Adapts
Capability Framework
score 
9/16  12.7/16  Target for this year was 9.1, so value
exceeded. 
Note: the SACF was modified this year,
so it is not possible to direct year-on-
year comparisons. 
Number of community
groups engaged in
proactive climate
resilience work
33 63 An additional 30 community resilience
groups were formed this year. This
exceeds our target of 53 based on 1
per community council area. While the
overall target is exceeded, there
remain some key areas without
groups.
Percentage of flood risk
management in FRMP
85% £58.6M Comrie Flood Protection Scheme is
due to complete Oct 2026 and makes

Page 55

actions that are on
track 
up the bulk of the spend over the next
12mths. 
South Kinross Flood Protection
Scheme needs to complete the Local
Authority Hearing to progress to
Detailed Design. 
All Cycle 1 Actions are underway,
some Cycle 2 Studies with more to
come over the next 12mths, and a
couple of Cycle 3 Actions have
progressed early due to Council
funding allocations.
Number of Bridge Scour
Assessments
Undertaken
11 13 Target: 100 over 5 years (TBC on overall
assessments needed) 
Focus for upcoming year
The focus for Year 5 will remain on assessing and delivering key risk mitigation
measures linked to flooding, scour and ash dieback. Supporting community resilience
and building wider regional resilience are also core focuses. Securing the resources to
deliver these will be a necessary priority.  This requires lobbying the Scottish
Government, exploring Council capital funding as well as external funding
opportunities. 
One additional Resilience action has been included this year – R36 - Development of a
property flood resilience scheme.   This recognises that many properties are can most
efficiently reduce flood risk at an individual property scale, but households may need
support in implementing protective measures.
The Top priority actions for next year, remain those as selected by Members in 2024: 
 R12 Develop and implement scour protection programme for key Council assets
 R24 Continued delivery of Flood Risk Management Cycle 1 Projects and
commence Cycle 2 projects 
 R20 Support community resilience groups to build proactive resilience.