Item 4(i) LRB-2022-49
Perth and Kinross Council · 16 January 2023
Back to Local Review Body — 16 January 2023 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
4(i) LRB-2022-49 LRB-2022-49 21/02195/FLL - Erection of a dwellinghouse, land 30 metres west of Wester Carmichael Cottage, Forgandenny Road, Bridge of Earn, PH2 9EZ INDEX (a) Papers submitted by the Applicant (Pages 11-56) (b) Decision Notice (Pages 59-60) Report of Handling (Pages 61-68) Reference Documents (Pages 35-55 and 69-70) (c) Representations (Pages 71-84) 9
Page 2
10
Page 3
4(i)(a) LRB-2022-49 LRB-2022-49 21/02195/FLL - Erection of a dwellinghouse, land 30 metres west of Wester Carmichael Cottage, Forgandenny Road, Bridge of Earn, PH2 9EZ PAPERS SUBMITTED BY THE APPLICANT 11
Page 4
12
Page 5
Page 1 of 5 Pullar House 35 Kinnoull Street Perth PH1 5GD Tel: 01738 475300 Fax: 01738 475310 Email: onlineapps@pkc.gov.uk Applications cannot be validated until all the necessary documentation has been submitted and the required fee has been paid. Thank you for completing this application form: ONLINE REFERENCE 100514035-002 The online reference is the unique reference for your online form only. The Planning Authority will allocate an Application Number when your form is validated. Please quote this reference if you need to contact the planning Authority about this application. Applicant or Agent Details Are you an applicant or an agent? * (An agent is an architect, consultant or someone else acting on behalf of the applicant in connection with this application) Applicant Agent Agent Details Please enter Agent details Company/Organisation: Ref. Number: You must enter a Building Name or Number, or both: * First Name: * Building Name: Last Name: * Building Number: Address 1 Telephone Number: * (Street): * Extension Number: Address 2: Mobile Number: Town/City: * Fax Number: Country: * Postcode: * Email Address: * Is the applicant an individual or an organisation/corporate entity? * Individual Organisation/Corporate entity Nicholas Lindsay Architects NL Architects Baker Street 1 Suite 110, Castle House 01786 821 945 FK8 1AL UK Stirling studio@nlarchitects.co.uk 13
Page 6
Applicant Details Please enter Applicant details Title: You must enter a Building Name or Number, or both: * Other Title: Building Name: First Name: * Building Number: Address 1 Last Name: * (Street): * Company/Organisation Address 2: Telephone Number: * Town/City: * Extension Number: Country: * Mobile Number: Postcode: * Fax Number: Email Address: * Site Address Details Planning Authority: Full postal address of the site (including postcode where available): Address 1: Address 2: Address 3: Address 4: Address 5: Town/City/Settlement: Post Code: Please identify/describe the location of the site or sites Northing Easting Ms R Perth and Kinross Council McFadzean Land adjacent to Wester Carmichael Cottage 717934 310837 14
Page 7
Page 3 of 5 Description of Proposal Please provide a description of your proposal to which your review relates. The description should be the same as given in the application form, or as amended with the agreement of the planning authority: * (Max 500 characters) Type of Application What type of application did you submit to the planning authority? * Application for planning permission (including householder application but excluding application to work minerals). Application for planning permission in principle. Further application. Application for approval of matters specified in conditions. What does your review relate to? * Refusal Notice. Grant of permission with Conditions imposed. No decision reached within the prescribed period (two months after validation date or any agreed extension) – deemed refusal. Statement of reasons for seeking review You must state in full, why you are a seeking a review of the planning authority’s decision (or failure to make a decision). Your statement must set out all matters you consider require to be taken into account in determining your review. If necessary this can be provided as a separate document in the ‘Supporting Documents’ section: * (Max 500 characters) Note: you are unlikely to have a further opportunity to add to your statement of appeal at a later date, so it is essential that you produce all of the information you want the decision-maker to take into account. You should not however raise any new matter which was not before the planning authority at the time it decided your application (or at the time expiry of the period of determination), unless you can demonstrate that the new matter could not have been raised before that time or that it not being raised before that time is a consequence of exceptional circumstances. Have you raised any matters which were not before the appointed officer at the time the Yes No Determination on your application was made? * If yes, you should explain in the box below, why you are raising the new matter, why it was not raised with the appointed officer before your application was determined and why you consider it should be considered in your review: * (Max 500 characters) Erection of a dwellinghouse Land 30 Metres West Of Wester Carmichael Cottage Forgandenny Road Bridge Of Earn Please refer to enclosed document titled '21-211 Appeal Supporting Information' 15
Page 8
Page 4 of 5 Please provide a list of all supporting documents, materials and evidence which you wish to submit with your notice of review and intend to rely on in support of your review. You can attach these documents electronically later in the process: * (Max 500 characters) Application Details Please provide the application reference no. given to you by your planning authority for your previous application. What date was the application submitted to the planning authority? * What date was the decision issued by the planning authority? * Review Procedure The Local Review Body will decide on the procedure to be used to determine your review and may at any time during the review process require that further information or representations be made to enable them to determine the review. Further information may be required by one or a combination of procedures, such as: written submissions; the holding of one or more hearing sessions and/or inspecting the land which is the subject of the review case. Can this review continue to a conclusion, in your opinion, based on a review of the relevant information provided by yourself and other parties only, without any further procedures? For example, written submission, hearing session, site inspection. * Yes No Please indicate what procedure (or combination of procedures) you think is most appropriate for the handling of your review. You may select more than one option if you wish the review to be a combination of procedures. Please select a further procedure * Please explain in detail in your own words why this further procedure is required and the matters set out in your statement of appeal it will deal with? (Max 500 characters) In the event that the Local Review Body appointed to consider your application decides to inspect the site, in your opinion: Can the site be clearly seen from a road or public land? * Yes No Is it possible for the site to be accessed safely and without barriers to entry? * Yes No 21-211 Appeal Supporting Information 21-211 PL-01 Location Plan 21-211 PL-02 Existing Block Plan 21-211 PL-03 Proposed Block Plan 21-211 PL-04 Proposed Drawings 21-211 PL-05 Visuals 21-211 PL-06 Design Statement 21-211 PL-07 External Store Elevation 21-211 PL-08 Streetscape 21/02195/FLL 25/05/2022 By means of inspection of the land to which the review relates 09/12/2021 The planning case officer did not visit site during this application. We believe this led to a failure to fully appreciate the sloping topography of the site and contributed to a lack of understanding of the proposal within its setting. We therefore recommend a site inspection is carried out by the committee members so they can fully understand the proposals. 16
Page 9
Page 5 of 5 Checklist – Application for Notice of Review Please complete the following checklist to make sure you have provided all the necessary information in support of your appeal. Failure to submit all this information may result in your appeal being deemed invalid. Have you provided the name and address of the applicant?. * Yes No Have you provided the date and reference number of the application which is the subject of this Yes No review? * If you are the agent, acting on behalf of the applicant, have you provided details of your name Yes No N/A and address and indicated whether any notice or correspondence required in connection with the review should be sent to you or the applicant? * Have you provided a statement setting out your reasons for requiring a review and by what Yes No procedure (or combination of procedures) you wish the review to be conducted? * Note: You must state, in full, why you are seeking a review on your application. Your statement must set out all matters you consider require to be taken into account in determining your review. You may not have a further opportunity to add to your statement of review at a later date. It is therefore essential that you submit with your notice of review, all necessary information and evidence that you rely on and wish the Local Review Body to consider as part of your review. Please attach a copy of all documents, material and evidence which you intend to rely on Yes No (e.g. plans and Drawings) which are now the subject of this review * Note: Where the review relates to a further application e.g. renewal of planning permission or modification, variation or removal of a planning condition or where it relates to an application for approval of matters specified in conditions, it is advisable to provide the application reference number, approved plans and decision notice (if any) from the earlier consent. Declare – Notice of Review I/We the applicant/agent certify that this is an application for review on the grounds stated. Declaration Name: Mr NL Architects Declaration Date: 24/08/2022 17
Page 10
18
Page 11
19
Page 12
20
Page 13
21
Page 14
22
Page 15
23
Page 16
24
Page 17
25
Page 18
26
Page 19
27
Page 20
28
Page 21
29
Page 22
30
Page 23
31
Page 24
32
Page 25
33
Page 26
34
Page 27
35
Page 28
36
Page 29
37
Page 30
38
Page 31
39
Page 32
40
Page 33
41
Page 34
42
Page 35
43
Page 36
44
Page 37
45
Page 38
46
Page 39
47
Page 40
48
Page 41
49
Page 42
50
Page 43
51
Page 44
52
Page 45
53
Page 46
54
Page 47
55
Page 48
56
Page 49
4(i)(b) LRB-2022-49 LRB-2022-49 21/02195/FLL - Erection of a dwellinghouse, land 30 metres west of Wester Carmichael Cottage, Forgandenny Road, Bridge of Earn, PH2 9EZ PLANNING DECISION NOTICE REPORT OF HANDLING REFERENCE DOCUMENTS (part included in applicant’s submission, pages 35-55) 57
Page 50
58
Page 51
Ms R McFadzean c/o NL Architects Nicholas Goward 48 West George Street Glasgow G2 1BP TOWN AND COUNTRY PLANNING (SCOTLAND) ACT Pullar House 35 Kinnoull Street PERTH PH1 5GD Date of Notice:25th May 2022 Application Reference: 21/02195/FLL I am directed by the Planning Authority under the Town and Country Planning (Scotland) Acts currently in force, to refuse your application registered on 10th January 2022 for Planning Permission for Erection of a dwellinghouse Land 30 Metres West Of Wester Carmichael Cottage Forgandenny Road Bridge Of Earn David Littlejohn Head of Planning and Development Reasons for Refusal 1. The proposal is contrary to Policy 19 Housing in the Countryside of the Perth and Kinross Local Development Plan 2 (2019) and the associated Housing in the Countryside Supplementary Guidance 2020 (SG) as the scale/mass/design of the dwelling proposed would not meet the criteria outlined under Category 1 which requires that new housing respect the character, scale and form of the group, should not detract from the visual amenity of the group and that a high standard of residential amenity has not been provided for existing dwellings. 2. The proposal is contrary to Policies 1A and 1B (Placemaking) of the Perth and Kinross adopted Local Development Plan 2 (2019) and the Placemaking Supplementary Guidance 2020, which all seek to ensure that all new developments contribute positively to the quality of the surrounding built and natural environment, and that all proposals complement its surroundings in terms of appearance, height, scale, massing, materials, finishes and colours. Due to a combination of the scale, height, massing and appearance of the dwelling compounded by the tapering nature of the site and siting adjacent to a modest cottage the proposal is not considered to contribute positively to the surrounding environment. 59
Page 52
Justification The proposal is in accordance with the Development Plan and there are no material reasons which justify departing from the Development Plan. Notes The plans and documents relating to this decision are listed below and are displayed on Perth and Kinross Council’s website at www.pkc.gov.uk “Online Planning Applications” Plan Reference 01 02 03 04 05 06 07 08 09 60
Page 53
REPORT OF HANDLING DELEGATED REPORT Ref No 21/02195/FLL Ward No P9- Almond And Earn Due Determination Date 9th March 2022 Draft Report Date 19th May 2022 Report Issued by JF Date20/05/22 PROPOSAL: Erection of a dwellinghouse LOCATION: Land 30 Metres West Of Wester Carmichael Cottage Forgandenny Road Bridge Of Earn SUMMARY: This report recommends refusal of the application as the development is considered to be contrary to the relevant provisions of the Development Plan and there are no material considerations apparent which justify setting aside the Development Plan. SITE VISIT: In line with established practices, the need to visit the application site has been carefully considered by the case officer. The application site and its context have been viewed by a variety of remote and electronic means, such as aerial imagery and Streetview, in addition to photographs submitted by interested parties. In addition the site was visited in early 2020 during the consideration of the previous application on the site. SITE PHOTOGRAPHS 61
Page 54
BACKGROUND AND DESCRIPTION OF PROPOSAL The proposal is for the erection of a dwellinghouse at land west Of Wester Carmichael Cottage, Forgandenny Road, Bridge Of Earn. The site forms the garden ground and is bound by the public road to the north, a dwelling to the east and agricultural land to the west/south. The proposal is to erect a 1 ½ storey dwelling with extended rear elevation following the linear style of development. In principle permission was granted on the site in 2020. SITE HISTORY 20/00138/IPL Erection of a dwellinghouse (in principle) 30 March 2020 Application Approved PRE-APPLICATION CONSULTATION Pre application Reference: N/A NATIONAL POLICY AND GUIDANCE The Scottish Government expresses its planning policies through The National Planning Framework, the Scottish Planning Policy (SPP), Planning Advice Notes (PAN), Creating Places, Designing Streets, National Roads Development Guide and a series of Circulars. 62
Page 55
DEVELOPMENT PLAN The Development Plan for the area comprises the TAYplan Strategic Development Plan 2016-2036 and the Perth and Kinross Local Development Plan 2 (2019). TAYplan Strategic Development Plan 2016 – 2036 - Approved October 2017 Whilst there are no specific policies or strategies directly relevant to this proposal the overall vision of the TAYplan should be noted. The vision states “By 2036 the TAYplan area will be sustainable, more attractive, competitive and vibrant without creating an unacceptable burden on our planet. The quality of life will make it a place of first choice where more people choose to live, work, study and visit, and where businesses choose to invest and create jobs.” Perth and Kinross Local Development Plan 2 – Adopted November 2019 The Local Development Plan 2 (LDP2) is the most recent statement of Council policy and is augmented by Supplementary Guidance. The principal policies are: Policy 1A: Placemaking Policy 1B: Placemaking Policy 5: Infrastructure Contributions Policy 19: Housing in the Countryside Policy 32: Embedding Low & Zero Carbon Generating Technologies in New Development Policy 53B: Water Environment and Drainage: Foul Drainage Policy 53C: Water Environment and Drainage: Surface Water Drainage Policy 53E: Water Environment and Drainage: Water Supply Policy 60B: Transport Standards and Accessibility Requirements: New Development Proposals OTHER POLICIES Placemaking Supplementary Guidance Developer Contributions Supplementary Guidance Housing in the Countryside Supplementary Guidance CONSULTATION RESPONSES Development Contributions Officer Contribution required Conservation Team No impact on setting LBC Transport Planning No objection to formation of access Scottish Water No objection 63
Page 56
REPRESENTATIONS No letters received ADDITIONAL STATEMENTS Screening Opinion EIA Not Required Environmental Impact Assessment (EIA): Environmental Report Not applicable Appropriate Assessment Habitats Regulations AA Not Required Design Statement or Design and Access Statement Submitted Report on Impact or Potential Impact eg Flood Risk Assessment Not Required APPRAISAL Sections 25 and 37 (2) of the Town and Country Planning (Scotland) Act 1997 require that planning decisions be made in accordance with the development plan unless material considerations indicate otherwise. The Development Plan for the area comprises the approved TAYplan and the adopted LDP2. In this instance, section 14(2) of the Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997 places a duty on planning authorities in determining such an application as this to have special regard to the desirability of preserving the building or its setting or any features of special architectural or historic interest which it possesses. The determining issues in this case are whether; the proposal complies with development plan policy; or if there are any other material considerations which justify a departure from policy. Policy Appraisal The principle of development has been established on the site through the in principle permission granted ref 20/00138/IPL. This application is to consider the detailed design of the proposals under Policy 1 Placemaking, Policy 19 Housing in the Countryside and the supplementary guidance for both policies. The principle of development on the site was approved under Category 1 Building Groups. This category states in relation to detailed proposals that new housing should respect the character, scale and form of the existing group, should not detract from the visual amenity of the group when viewed from the wider landscape and that a high standard of residential amenity will be provided for both existing and new housing. 64
Page 57
Policy 1 Placemaking states that the design, density and siting of development should respect the character and amenity of the place. Development should complement its surroundings in terms of appearance, height, scale, massing, materials, finishes and colours. The site narrows forming a triangular plot at the end of a row of dwellings. The row tapers towards the site with the scale of development decreasing. The row ranges from single storey dwellings which accommodate upper levels within steeper roof pitches using dormers/rooflights to traditional single storey cottages with low pitched roofs. Whilst it is accepted a number of these dwelling feature more substantial rear elevations on the road side they are overwhelming of modest scale. It is considered that the cumulative impact of different elements of the proposal would not respect the character and amenity of the area. The dwelling is large 1 1/2 storey and is sited where adjacent dwellings are single storey in appearance. The site levels have been utilised to try and mitigate the taller scale of the development so that the ground floor of the dwelling is partially screened by the higher road level and site boundaries however the first floor of the dwelling will be fully visible. The site will also have a new access formed to the west this will require site clearance to form an access ramp and visibility splays. This will further open up the site where it is currently contained and introduce large gable end view of the dwelling compounding the scale. The agent has sought to address the height by submitting a street elevation plan. Whilst this shows that in long views the dwelling will not be significantly higher there are still remaining concerns about the overall development within the site and how the dwelling will sit beside the modest neighbouring cottage. In this case it is considered that the development as proposed does not respect the character of development and it is considered that at this end of the row a more modest approach to the design was required. Design and Layout The dwelling is 1 ½ storey with traditional proportions/materials and contemporary design detailing. The roadside elevation will have the ground floor mostly screened with the 1st floor visible above the fence line. The upper floor on the roadside elevation has a narrow feature gable and rooflights which extend down to the wall head. To the rear the overall mass of the dwelling is substantial with large amounts of full height glazing and a projecting gable which links to a covered lower terrace and first floor balcony. Whilst I accept that the agent has made an attempt to contain the large detailed elevation to the rear the overall scale of the dwelling in combination with the height and formation of the new access results in a dwelling of such a scale and resulting design that which will jar with the existing modest traditional row of cottages. As with the principle of development being established on the site it is considered that a scaled back design could address concerns, but the agent has repeatedly 65
Page 58
chosen to justify individual design elements rather than address the overall scheme in relation to the site characteristics. Residential Amenity In addition to concerns about the overall mass/height the dwelling is sited 2.2m from the boundary with windows proposed at the first floor and a balcony at first floor. The agent has sought to address this by using an opaque glazing screens to the balcony and opaque glass on the windows in the east elevation. It is considered that the impact of overlooking should be designed out of the dwelling rather than by the inclusion of glazing which would need to be maintained in perpetuity. This adds to the concern that the dwelling proposed is not the correct design solution of this site which has a number of constraints. Roads and Access The development is proposed to be served by a new access formed to the west of the plot. Whilst Transport Planning have no objection the formation of the access as parking and visibility have been shown the level changes will require engineering to bridge the 1.8m difference between the road and site. As previously stated, the opening up of the site to accommodate a single access instead of utilising the access of the dwelling to the east will expose more of the large scale of the dwelling. Drainage and Flooding The site is not at risk of flooding. The plans detail the surface water outfall is to the existing burn and the existing foul treatment plant next door (within the ownership of the applicant) will be upgraded to accommodate the development. Conservation Considerations The neighbouring cottages are category Cs listed. It is considered that the development of the site would not have a detrimental impact on the immediate setting of the listed buildings. Developer Contributions Developer contributions are applicable on this site and would have been required in respect of education and transport infrastructure if the development had been supported. Economic Impact The economic impact of the proposal is likely to be minimal and limited to the construction phase of the development. VARIATION OF APPLICATION UNDER SECTION 32A This application was not varied prior to determination. 66
Page 59
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS None required. DIRECTION BY SCOTTISH MINISTERS None applicable to this proposal. CONCLUSION AND REASONS FOR DECISION To conclude, the application must be determined in accordance with the adopted Development Plan unless material considerations indicate otherwise. In this respect, the proposal is considered to be contrary to the Development Plan. Account has been taken of the relevant material considerations and none has been found that would justify overriding the adopted Development Plan. Accordingly the proposal is refused on the grounds identified below. Reasons 1 The proposal is contrary to Policy 19 Housing in the Countryside of the Perth and Kinross Local Development Plan 2 (2019) and the associated Housing in the Countryside Supplementary Guidance 2020 (SG) as the scale/mass/design of the dwelling proposed would not meet the criteria outlined under Category 1 which requires that new housing respect the character, scale and form of the group, should not detract from the visual amenity of the group and that a high standard of residential amenity has not been provided for existing dwellings. 2 The proposal is contrary to Policies 1A and 1B (Placemaking) of the Perth and Kinross adopted Local Development Plan 2 (2019) and the Placemaking Supplementary Guidance 2020, which all seek to ensure that all new developments contribute positively to the quality of the surrounding built and natural environment, and that all proposals complement its surroundings in terms of appearance, height, scale, massing, materials, finishes and colours. Due to a combination of the scale, height, massing and appearance of the dwelling compounded by the tapering nature of the site and siting adjacent to a modest cottage the proposal is not considered to contribute positively to the surrounding environment. Justification The proposal is in accordance with the Development Plan and there are no material reasons which justify departing from the Development Plan. Informatives N/A Procedural Notes Not Applicable. 67
Page 60
PLANS AND DOCUMENTS RELATING TO THIS DECISION 01 02 03 04 05 06 07 08 09 68
Page 61
3(5/,*+762/$5 4th Generation Module Series Black PLUS+ SERIES Models available: 54 Cell 250w • 255w 60 Cell 250w • 285w • 300w 72 Cell 300w • 330w Reliability Creativity $σRUGDELOLW\ EFFICIENCY 21.7% CELL UP TO EFFICIENCY 18.44% MODULE UP TO BLACK CLASSIC ALL Approved by: 0$18)$&785,1*%$6( 3HUOLJKW6RODU&R/WG 0X\X$GPLQLVWUDWLRQ'LVWULFW :HQOLQJ=KHMLDQJ &KLQD MHQQ\XN#SHUOLJKWFRP */2%$/0$5.(7,1*&(175( 3HUOLJKW6RODU&R/WG (WKIORRU;LQMLQTLDR5G 3X'RQJ'LVWULFW6KDQJKDL &KLQD HQTXLU\#SHUOLJKWFRP DISTRIBUTION PARTNER Buy PV Direct Limited Tindall Mill, Kirkgate, Tydd St Giles, Wisbech, Cambs, PE13 5NE sales@buypvdirect.co.uk • )LHOGUHSODFHDEOHGLRGHFRYHU • /RZHUMXQFWLRQER[UXQQLQJWHPSHUDWXUH • 8SJUDGDEOHWRDGGIXQFWLRQDOLW\ Cover upgrade options: • 0RGXOHOHYHOPRQLWRULQJ • 6DIHW\ • 2SWLPL]DWLRQ • /RQJ6WULQJV • $SSURYHGE\DOOPDMRULQYHUWHUPDQXIDFWXUHUV • 0&6&HUWLILHG • 3RVLWLYHRXWSXWWROHUDQFH • )LUHVDIHW\FHUWLILHG • 3,')UHHFHUWLILHG • $PPRQLDFRUURVLRQUHVLVWDQFHFHUWLILHG • 6DOWPLVWFRUURVLRQUHVLVWDQFHFHUWLILHG • DFFUHGLWHGPRGXOHW\SHV • :RUOGZLGHDFFUHGLWDWLRQ 3DVVLYDWHG(PLWWHU5HDU &HOO7HFKQRORJ\ • 4XDOLW\*XDUDQWHHG • <HDU:RUNPDQVKLS:DUUDQW\ • <HDU2XWSXW3HUIRUPDQFH:DUUDQW\ • !2XWSXWIRU<HDUV • !2XWSXWIRU<HDUV • 2YHU<HDUV0DQXIDFWXULQJ([SHULHQFH Quality Guarantee Classic All Black Monocrystalline Smart-Ready Junction box More Efficient PERC Cell Technology 4BB Cell 3/00%6HULHV :HLJKW 1NJ 1640 mm 992 mm 3/00%6HULHV :HLJKW 1NJ 1482 mm 992 mm 992 mm 1956 mm 3/00%6HULHV :HLJKW 1NJ +44 (0)1945 870818 www.buypvdirect.co.uk69
Page 62
YBPVD1 3RZHU7ROHUDQFH :RUNLQJ7HPSHUDWXUH &WR& 0D[6\VWHP9ROWDJH 9'& :LQG5DWLQJ 3D +DLO5HVLVWDQFH PP#NPK 0D[)XVH5DWLQJ $PS )UDPH7KLFNQHVV PPPP &ODPSRQ/RQJRU6KRUWVLGHV 0$18)$&785,1*%$6( 3HUOLJKW6RODU&R/WG 0X\X$GPLQLVWUDWLRQ'LVWULFW :HQOLQJ=KHMLDQJ &KLQD MHQQ\XN#SHUOLJKWFRP */2%$/0$5.(7,1*&(175( 3HUOLJKW6RODU&R/WG (WKIORRU;LQMLQTLDR5G 3X'RQJ'LVWULFW6KDQJKDL &KLQD HQTXLU\#SHUOLJKWFRP DISTRIBUTION PARTNER Buy PV Direct Limited Tindall Mill, Kirkgate, Tydd St Giles, Wisbech, Cambs, PE13 5NE sales@buypvdirect.co.uk 7HPSHUDWXUH&RHIILFLHQW&
Page 63
9RF ,VF:S 9PS ,VF 12&7 3PD[ 9PS
&HOO
3/00%
6HULHV
(OHFWULFDO&KDUDFWHULVWLFV
,PS 9RF
6PDUW5HDG\
'LRGHFRYHU
x )LHOGUHSODFHDEOH
x 8SJUDGHDEOH
x +HDWGLVVLSDWLRQDZD\IURPWKHPRGXOH
x 76EDVHSODWH
x $SSOLFDEOHWRFRQYHQWLRQDODQGVPDUWPRGXOHV
1
1
6PDUW5HDG\
-XQFWLRQ BR[
NDPHSODWH
%DUFRGH
0& FRQQHFWRUV
IP
5HDUIUDPHPRXQWLQJKROH SRVLWLRQVFRPPRQWRDOOWKUHHPRGXOHVL]HV
0RXQWLQJKROHVL]H
AOO PHDVXUHPHQWV LQ PP
v E[WUHPHO\ UHOLDEOHVFUHZ
OHVV LQWHUFRQQHFWHGIUDPH
IRU ORQJWHUPIOH[LELOLW\ DQG
VWUHQJWK
v PRXQWLQJ KROHV IRU GLUHFW
PRXQWLQJ RSWLRQ
v LQEXLOW GUDLQDJH
ZDWHUVSRXWV
v HDUWK JURXQGPage 64
SRLQWV v THPSHUHG AR& DQWLUHIOHFWLYH
Page 65
IURQW JODVV PERLIGHT 62/$5PLM SERIES BLACK3/86 6HULHVSpecifications PLM-250MB-54 Series Frame Size:[PP Frame Thickness: PP Weight:NJ Number of Cells: Cell Type:0RQR3(5& Power Outputs: :: PLM-300MB-60 Series Frame Size: [PP Frame Thickness: PP Weight:NJ Number of Cells: Cell Type:0RQR3(5& Power Outputs: :: PLM-330MB-72 Series Frame Size: [PP Frame Thickness: PP Weight:NJ Number of Cells: Cell Type: 0RQR3(5& Power Outputs: :: IEC61730 safety rated for high wind pressure, hail impact, snow load and fire. Certified against Salt mist corrosion for coastal areas. Certified against Ammonia corrosion for agricultural installations. Produced in an environmentally friendly ISO 9001, OHSAS 18001 and ISO 14000 certified manufacturing facility, which has been utilizing an on-site 360kW Perlight Solar system since 2006. &HOO 3/00% 6HULHV &HOO 3/00% 6HULHV +44 (0)1945 870818 www.buypvdirect.co.uk70
Page 66
4(i)(c) LRB-2022-49 LRB-2022-49 21/02195/FLL - Erection of a dwellinghouse, land 30 metres west of Wester Carmichael Cottage, Forgandenny Road, Bridge of Earn, PH2 9EZ REPRESENTATIONS 71
Page 67
72
Page 68
SW Public General Thursday, 27 January 2022 Local Planner Planning and Development Perth and Kinross Council Perth PH1 5GD Dear Customer, 30M W of Wester Carmichael Cottage, Forgandenny Road, Bridge Of Earn Planning Ref: 21/02195/FLL Our Ref: DSCAS-0057037-GCV Proposal: Erection of a dwellinghouse Please quote our reference in all future correspondence Audit of Proposal Scottish Water has no objection to this planning application; however, the applicant should be aware that this does not confirm that the proposed development can currently be serviced and would advise the following: Water Capacity Assessment Scottish Water has carried out a Capacity review and we can confirm the following: There is currently sufficient capacity in the Turret Water Treatment Works to service your development. However, please note that further investigations may be required to be carried out once a formal application has been submitted to us. Waste Water Capacity Assessment Unfortunately, according to our records there is no public Scottish Water, Waste Water infrastructure within the vicinity of this proposed development therefore we would advise applicant to investigate private treatment options. Development Operations The Bridge Buchanan Gate Business Park Cumbernauld Road Stepps Glasgow G33 6FB Development Operations Freephone Number - 0800 3890379 E-Mail - DevelopmentOperations@scottishwater.co.uk www.scottishwater.co.uk 73
Page 69
SW Public General Please Note The applicant should be aware that we are unable to reserve capacity at our water and/or waste water treatment works for their proposed development. Once a formal connection application is submitted to Scottish Water after full planning permission has been granted, we will review the availability of capacity at that time and advise the applicant accordingly. Asset Impact Assessment According to our records, the development proposals impact on existing Scottish Water assets. The applicant must identify any potential conflicts with Scottish Water assets and contact our Asset Impact Team via our Customer Portal to apply for a diversion. The applicant should be aware that any conflict with assets identified may be subject to restrictions on proximity of construction. Please note the disclaimer at the end of this response. Surface Water For reasons of sustainability and to protect our customers from potential future sewer flooding, Scottish Water will not accept any surface water connections into our combined sewer system. There may be limited exceptional circumstances where we would allow such a connection for brownfield sites only, however this will require significant justification from the customer taking account of various factors including legal, physical, and technical challenges. In order to avoid costs and delays where a surface water discharge to our combined sewer system is anticipated, the developer should contact Scottish Water at the earliest opportunity with strong evidence to support the intended drainage plan prior to making a connection request. We will assess this evidence in a robust manner and provide a decision that reflects the best option from environmental and customer perspectives. General notes: Scottish Water asset plans can be obtained from our appointed asset plan providers: Site Investigation Services (UK) Ltd Tel: 0333 123 1223 Email: sw@sisplan.co.uk www.sisplan.co.uk Scottish Water’s current minimum level of service for water pressure is 1.0 bar or 10m head at the customer’s boundary internal outlet. Any property which cannot be adequately serviced from the available pressure may require private pumping 74
Page 70
SW Public General arrangements to be installed, subject to compliance with Water Byelaws. If the developer wishes to enquire about Scottish Water’s procedure for checking the water pressure in the area, then they should write to the Customer Connections department at the above address. If the connection to the public sewer and/or water main requires to be laid through land out-with public ownership, the developer must provide evidence of formal approval from the affected landowner(s) by way of a deed of servitude. Scottish Water may only vest new water or waste water infrastructure which is to be laid through land out with public ownership where a Deed of Servitude has been obtained in our favour by the developer. The developer should also be aware that Scottish Water requires land title to the area of land where a pumping station and/or SUDS proposed to vest in Scottish Water is constructed. Please find information on how to submit application to Scottish Water at our Customer Portal. Next Steps: All Proposed Developments All proposed developments require to submit a Pre-Development Enquiry (PDE) Form to be submitted directly to Scottish Water via our Customer Portal prior to any formal Technical Application being submitted. This will allow us to fully appraise the proposals. Where it is confirmed through the PDE process that mitigation works are necessary to support a development, the cost of these works is to be met by the developer, which Scottish Water can contribute towards through Reasonable Cost Contribution regulations. Non Domestic/Commercial Property: Since the introduction of the Water Services (Scotland) Act 2005 in April 2008 the water industry in Scotland has opened to market competition for non-domestic customers. All Non-domestic Household customers now require a Licensed Provider to act on their behalf for new water and waste water connections. Further details can be obtained at www.scotlandontap.gov.uk Trade Effluent Discharge from Non-Domestic Property: Certain discharges from non-domestic premises may constitute a trade effluent in terms of the Sewerage (Scotland) Act 1968. Trade effluent arises from activities including; manufacturing, production and engineering; vehicle, plant and equipment washing, waste and leachate management. It covers both large and small premises, including activities such as car washing and 75
Page 71
SW Public General launderettes. Activities not covered include hotels, caravan sites or restaurants. If you are in any doubt as to whether the discharge from your premises is likely to be trade effluent, please contact us on 0800 778 0778 or email TEQ@scottishwater.co.uk using the subject “Is this Trade Effluent?". Discharges that are deemed to be trade effluent need to apply separately for permission to discharge to the sewerage system. The forms and application guidance notes can be found here. Trade effluent must never be discharged into surface water drainage systems as these are solely for draining rainfall run off. For food services establishments, Scottish Water recommends a suitably sized grease trap is fitted within the food preparation areas, so the development complies with Standard 3.7 a) of the Building Standards Technical Handbook and for best management and housekeeping practices to be followed which prevent food waste, fat oil and grease from being disposed into sinks and drains. The Waste (Scotland) Regulations which require all non-rural food businesses, producing more than 50kg of food waste per week, to segregate that waste for separate collection. The regulations also ban the use of food waste disposal units that dispose of food waste to the public sewer. Further information can be found at www.resourceefficientscotland.com I trust the above is acceptable however if you require any further information regarding this matter please contact me on 0800 389 0379 or via the e-mail address below or at planningconsultations@scottishwater.co.uk. Yours sincerely, Angela Allison Development Services Analyst PlanningConsultations@scottishwater.co.uk Scottish Water Disclaimer: “It is important to note that the information on any such plan provided on Scottish Water’s infrastructure, is for indicative purposes only and its accuracy cannot be relied upon. When the exact location and the nature of the infrastructure on the plan is a material requirement then you should undertake an appropriate site investigation to confirm its actual position in the ground and to determine if it is suitable for its intended purpose. By using the plan you agree that Scottish Water will not be liable for any loss, damage or costs caused by relying upon it or from carrying out any such site investigation." 76
Page 72
77
Page 73
78
Page 74
79
Page 75
80
Page 76
81
Page 77
82
Page 78
83
Page 79
84