(d) Further Information (Pages 695-698)
Perth and Kinross Council · 18 December 2023
Back to Local Review Body — 18 December 2023 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.
Page 1
5(i)(d) LRB-2023-17 LRB-2023-17 – 22/01942/IPL – Residential development (in principle), land 50 metres south of Strawberrybank, Longforgan FURTHER INFORMATION
Page 2
No embedded text on this page.
Page 3
Comments to the Development Quality Manager on a Planning Application Planning Application ref. 22/01942/IPL Comments provided by Niall Moran Service/Section Transportation & Development Contact Details TransportPlanning@pkc.gov.uk Description of Proposal Residential development (in principle) Address of site Land 50 Metres South Of Strawberrybank, Longforgan Comments on the proposal Having now reviewed the additional information provided as part of the application review process, I note that the applicant has undertaken speed surveys and clarified the ability to achieve a suitable visibility splay to the south of the access. The drawing provided demonstrates that a 2.4m x 70m splay can be achieved using land that is within control of the applicant which is deemed to be acceptable for this location based on the speed survey data collected. It is noted that the formation of this visibility splay will require the relocation of the boundary fence and removal of hedging along with appropriate earthworks and therefore I would wish to see this provided prior to the commencement of the development. Recommended planning condition(s) No development in connection with the permission hereby granted shall commence until the vehicular access has been provided and surfaced in accordance with Perth & Kinross Council's Road Development Guide Type B Figure 5.6 access detail, of Type B Road construction detail. The Type B Road construction detail shall continue to the entrance for a distance of 3 metres. Once provided, the vehicular and pedestrian access shall thereafter be permanently retained as such. Reason - In the interests of road safety; to ensure an acceptable standard of construction within the public road boundary. No development in connection with the permission hereby granted shall commence until a visibility splay of 2.4m x 70m to the south of the vehicular access has been provided (as per drawing number 18191/03/001) with no obstructions within the vertical plane that would restrict the visibility of the carriageway. Once provided, the visibility splay shall thereafter be permanently retained as such. Reason - In the interests of road safety. Recommended informative(s) for applicant The applicant is advised that, in terms of Sections 56 of the Roads (Scotland) Act 1984, he/she/they must obtain from the Council, as Roads Authority, consent to open an existing road or footway prior to the commencement of works. Date comments returned 6 November 2023
Page 4
CDS Planning Local Review Body From: Karen Clark <karen@ktclark.co.uk> Sent: 15 November 2023 07:21 To: CDS Planning Local Review Body Cc: Kenneth Petrie; Mark Walker Subject: Re: LRB-2023-17 Morning, many thanks for passing the consultation response from The Roads Service which confirms no objection to the proposal subject to 2 conditions. I can confirm the appellants have no issues with the required conditions and is happy to comply with the requirements should planning consent be forthcoming. I trust this is sufficient and the application for review can proceed to the next LRB. Many thanks Karen Clark