4(ii)(b) 
LRB-2023-39 
LRB-2023-39
23/00532/FLL - Erection of a dwellinghouse and associated
works, land north of 31 Main Street, Keltybridge 
PLANNING DECISION NOTICE (included in
applicant’s submission, pages 79-80) 
REPORT OF HANDLING 
REFERENCE DOCUMENTS

Page 2

No embedded text on this page.

Page 3

REPORT OF HANDLING  
DELEGATED REPORT  
Ref No 23/00532/FLL
Ward No P8- Kinross-shire
Due Determination Date 20th June 2023 Extended to 20th August 2023
Draft Report Date 26th July 2023
Report Issued by cm Date 4/8/23 
PROPOSAL:  Erection of a dwellinghouse and associated works    
LOCATION:  Land North Of 31 Main Street, Keltybridge   
SUMMARY: 
This report recommends refusal of the application as the development is considered
to be contrary to the relevant provisions of the Development Plan and there are no
material considerations apparent which justify setting aside the Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
The application is for a dwellinghouse on land to the north of 31 Main Street, on the
east side of Main Street, Keltybridge. 
A split-level dwellinghouse is proposed with a single storey element facing Main
Street (west) and 2-storeys to the north and east as the land drops by some 3m from
Main Street (west) to the east boundary of the site. The north and west elevations
are to be finished in rubble stonework and the remainder in smooth white render.
Clay pantiles are proposed on the roof with skew walls on each gable. Vehicular
access is from Main Street (west) with 2no in curtilage parking spaces proposed. A
1.2m-1.8m high close board fence is proposed on the south boundary next to a
neighbouring dwellinghouse. 
A Tree Survey Report and a Landscape Report have been submitted with 22no trees
to be removed to enable the development. 46no compensatory trees are proposed
with 20no to be planted on the north and east boundary of the site and 26no trees
are proposed off-site as outlined in the Tree Protection Plan and Compensatory
Planting Plan prepared by BNTW Scotland dated 17/3/23 (drawing 09).  
There are dwellinghouses to the south and on the west side of Main Street and to
the north and east of the application site is farmland. 
SITE HISTORY  
00/01049/FUL Erection of 2 semi-detached dwellinghouses and associated
carparking and landscaping 2 November 2000 Application Withdrawn  
00/01380/FUL Erection of a house 2 November 2000 Application Refused

Page 4

00/01558/FUL Siting of temporary caravan 1 December 2000 Application Withdrawn  
05/00204/FUL Temporary siting of a site office/storage cabin 27 April 2005
Application Approved  
05/02299/FUL Erection of a dwellinghouse with potential for use as guest house 16
February 2006 Application Refused and Appeal Dismissed 27 June 2006    
12/01340/FLL Erection of 4 dwellinghouses at Site 5B 21 November 2013
Application Withdrawn  
13/02177/FLL Erection of 2no. dwellinghouses 18 November 2015 Application
Approved  
17/01593/FLL Erection of 2no. dwellinghouses (revised design) 22 November 2017
Application Approved  
18/00170/FLL Erection of 2no. dwellinghouses (revised design) (in part retrospect)
29 March 2018 Application Withdrawn  
20/00201/FLL Erection of 2 dwellinghouses (in part retrospect) Application Approved  
22/01945/FLL Erection of dwellinghouse and associated works 19 January 2023
Application Withdrawn  
DEVELOPMENT PLAN  
The Development Plan for the area comprises National Planning Framework 4
(NPF4) and the Perth and Kinross Local Development Plan 2 (2019) (LDP2). 
National Planning Framework 4 
The National Planning Framework 4 (NPF4) is the Scottish Government’s long-term
spatial strategy with a comprehensive set of national planning policies.  This strategy
sets out how to improve people’s lives by making sustainable, liveable and
productive spaces.    
NPF4 was adopted on 13 February 2023. NPF4 has an increased status over
previous NPFs and comprises part of the statutory development plan.  
The Council’s assessment of this application has considered the following policies of
NPF4:  
Policy 1: Tackling the Climate and Nature Crisis  
Policy 2: Climate Mitigation and Adaptation  
Policy 3: Biodiversity  
Policy 6: Forestry, Woodland and Trees

Page 5

Policy 7: Historic Assets and Places  
Policy 9: Brownfield, vacant and derelict land and empty buildings 
Policy 13: Sustainable Transport  
Policy 14: Design, Quality and Place  
Policy 16: Quality Homes  
Policy 17: Rural Homes  
Policy 20: Blue and Green Infrastructure  
Perth and Kinross Local Development Plan 2 – Adopted November 2019  
The Local Development Plan 2 (LDP2) is the most recent statement of Council policy
and is augmented by Supplementary Guidance.  
The principal policies are:  
Policy 1A: Placemaking  
Policy 1B: Placemaking  
Policy 6: Settlement Boundaries  
Policy 27A: Listed Buildings  
Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development  
Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and Development  
Policy 41: Biodiversity  
Policy 42: Green Infrastructure  
Policy 53B: Water Environment and Drainage: Foul Drainage  
Policy 53C: Water Environment and Drainage: Surface Water Drainage  
Policy 58A: Contaminated and Unstable Land: Contaminated Land  
Policy 58B: Contaminated and Unstable Land: Unstable Land  
Policy 60B: Transport Standards and Accessibility Requirements: New Development
Proposals

Page 6

Statutory Supplementary Guidance  
 Supplementary Guidance - Flood Risk and Flood Risk Assessments
(adopted in 2021)
 Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
 Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
 Supplementary Guidance - Landscape (adopted in 2020)
 Supplementary Guidance - Placemaking (adopted in 2020)  
OTHER POLICIES  
Non-Statutory Guidance  
 Planning Guidance - Planning & Biodiversity  
NATIONAL GUIDANCE  
The Scottish Government expresses its planning policies through The National
Planning Framework, Planning Advice Notes, Creating Places, Designing Streets,
National Roads Development Guide and a series of Circulars.    
Planning Advice Notes  
The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
 PAN 40 Development Management
 PAN 51 Planning, Environmental Protection and Regulation
 PAN 61 Planning and Sustainable Urban Drainage Systems
 PAN 68 Design Statements
 PAN 69 Planning and Building standards Advice on Flooding
 PAN 75 Planning for Transport
 PAN 77 Designing Safer Places 
Creating Places 2013  
Creating Places is the Scottish Government’s policy statement on architecture and
place. It sets out the comprehensive value good design can deliver. It notes that
successful places can unlock opportunities, build vibrant communities and contribute
to a flourishing economy and set out actions that can achieve positive changes in our
places.  
Designing Streets 2010  
Designing Streets is the policy statement in Scotland for street design and changes
the emphasis of guidance on street design towards place-making and away from a
system focused upon the dominance of motor vehicles. It was created to support the
Scottish Government’s place-making agenda, alongside Creating Places.

Page 7

National Roads Development Guide 2014  
This document supports Designing Streets and expands on its principles and is
considered to be the technical advice that should be followed in designing and
approving of all streets including parking provision.  
CONSULTATION RESPONSES  
External  
The Coal Authority – An initial objection was withdrawn on submission and review of
a Coal Mining Risk Assessment.  
Scottish Water - No objection.  
Internal  
Biodiversity/Tree Officer - Object due to a lack of information on protected species.
The response noted that the application cannot be assessed until more information
is provided on protected species and justification of 22 trees being removed.  The
submitted tree survey proposes the removal of the majority of trees on the site for
arboricultural reasons with replacement planting. Query the removal of all 22 trees
as they provide an attractive tree belt and although may not be good in terms of
arboriculture, will still be of biodiversity benefit. As trees become older, they become
more suited for roosting bats, nesting birds and fungi. 6 trees are described as
Category U trees and must be removed for the health and safety reasons, but query
whether the design could have incorporated more of the trees from the planning
stage. Avoidance of tree loss should always be the first consideration and retaining
existing habitat is always better than creating new. For the loss of 22 trees, 46 new
are proposed. This is not in accordance with the ratio of 1:3 for every tree lost as
outlined in the PKC Planning for Nature Supplementary Guidance. No ecological
survey of the proposed development area or assessment of the likely effects from
this development on habitats and species was submitted alongside this application.
Policy 41 states that a detailed survey undertaken by a suitably qualified specialist
should be submitted where one or more protected or priority species is known or
suspected. There are records of red squirrel within 150m of the site and this should
have ensured that an ecological survey was submitted.  In addition, mature trees in
poorer condition may contain bat roosts. A survey to ascertain the presence of bats
roosts in trees is required.  Further survey cannot be conditioned as advised by the
Scottish Government. The full impact of a development on protected species or
habitats must be known prior to planning consent being issued. A Biodiversity
Enhancement Report has been submitted but without a baseline survey of the site, it
is unclear these recommendations will result in biodiversity enhancement. The
standard measures they propose should be incorporated into any new development. 
Transportation And Development - No objection subject to conditions.  
Development Contributions Officer - No requirement.

Page 8

Environmental Health (Contaminated Land) - No potential sources of contamination
on review of historical records. Informative recommended.  
REPRESENTATIONS  
10 representations were received objecting to the application. The material planning
issues raised are as follows – 
 Loss of greenspace
 Detrimental impact on use of community greenspace and local viewpoint
 Adverse effect on visual amenity 
 Contrary to Development Plan policy
 Loss of open space
 Over intensive development
 Inappropriate Land Use
 Road safety, traffic congestion concerns
 Overlooking, loss of privacy and impact on residential amenity
 Poor design, design not in keeping with character of the local area  
The issues raised are addressed in the report.  
The representations also raised the long-term use of the site as a compound for
storing and dumping building materials and waste during construction works in the
village. This has long been an eyesore site for residents.  
The loss of view from a dwellinghouse was raised as an issue which is not a material
planning consideration.  
Additional Statements Received:  
Screening Opinion  EIA Not Required
Environmental Impact Assessment (EIA):
Environmental Report
Not applicable
Appropriate Assessment under Habitats
Regulations
Habitats Regulations AA Not
Required
Design Statement or Design and Access
Statement
Submitted 
Report on Impact or Potential Impact eg Flood
Risk Assessment
Submitted Contamination
Reports and Tree survey
Reports  
APPRAISAL  
Sections 25 and 37 (2) of the Town and Country Planning (Scotland) Act 1997
require that planning decisions be made in accordance with the development plan
unless material considerations indicate otherwise.  The Development Plan comprises
NPF4 and the Perth and Kinross Local Development Plan 2019.  The relevant policy
considerations are outlined in the policy section above and are considered in more
detail below.  In terms of other material considerations, involving considerations of

Page 9

the Council’s other approved policies and supplementary guidance, these are
discussed below only where relevant.    
The determining issues in this case are whether; the proposal complies with
development plan policy; or if there are any other material considerations which
justify a departure from policy.  
Policy Appraisal  
National and local placemaking policy encourages, promotes and facilitates well
designed development. NPF4 Policy 14 Design Quality and Place requires
development proposals to be designed to improve the quality of an area whether in
urban or rural locations and be consistent with the six qualities of successful places –
Healthy; Pleasant; Connected; Distinctive; Sustainable and Adaptable. LDP2 Policy
1 Placemaking states that development must contribute positively to the quality of
the surrounding built and natural environment. 
A split-level dwellinghouse is proposed with a single storey element of the build
fronting Main Street (west). There is a 3m level change from Main Street to the east
boundary of the site and the design reflects this. The upper level contains the main
open plan living area and on the lower level are 3 bedrooms and a utility/store/plant
room. The west and north elevations are to be finished in rubble stonework and the
east and south elevations are to be finished in smooth white render. The roof is to be
clay pantiles with PV panels. The Design Statement notes that the choice of
materials complements the existing architecture and provides statement at the
northern entrance to the village. 
The finishing materials acknowledge the finish of the new cottages to the south.
However, the mass, form and design of the L-shaped split-level dwellinghouse is
poor, incongruous and not in keeping with the traditional styled cottages and the
surrounding historic village. 
This is a prominent site and the 2-storey north elevation finished in rubble stonework
will be the main view on the southern approach into the village. Landscaping and
trees may help soften the impact of the stone mass however this is likely to take
several years to mature to provide the level of screening required to reduce the
visual impact. This is acknowledged in the further supporting information submitted
during the application process which states the 2-storey element will only really be
visible from the field bordering the site. Once the proposed landscaping has been
implemented and matured the view of this part of the house will be considerably
reduced.    
This is a distinctive green site on the east side of the village which establishes the
transition from the village to open countryside.  The loss of this distinctive green
space will have a detrimental impact on the rural character and visual amenity of the
village. The proposed development is poorly designed and will not contribute
positively to the surrounding built and natural environment and is not consistent with
the six qualities of successful places.

Page 10

The proposal does not satisfy NPF4 Policy 14 Design Quality and Place and LDP2
Policy 1 Placemaking and related Placemaking Supplementary Guidance (2020).  
Residential Amenity  
Proposed Dwellinghouse  
The split-level design runs with the sloping site. However, no detail has been
provided on the landscaping and engineering works required to manage the sloping
site including the rear garden. The Tree Survey (paragraph 1.1) reports that ‘The
Client has also requested Arboricultural (Ecological) suggestions to enhance the
general garden area including reinstatement of the bank/steep slope after
excavation.’ The proposed plans show access to the garden will be by stepped
landscape features and retaining walls adjoin the proposed dwellinghouse. A 2m
difference between the proposed rear garden on the east boundary and the garden
ground of the neighbouring dwellinghouse is shown with limited detail of how this
level change is to be managed within the site. The bedrooms are on the lower level
and residential amenity and daylight may be negatively affected by the split-level
design and retaining structures.    
Existing Dwellinghouse  
There is a cottage style dwellinghouse to the immediate south of the application site
(20/00201/FLL). The approved site plan for the cottage shows a 900mm timber fence
on the boundary (north) with a 1500mm gap between the fence and the cottage. The
fence offers separation between the cottage and the green space to the north and
windows in the main living space of the cottage overlook this area providing an
attractive outlook. The conditions attached to the planning permission 20/00201/FLL
aimed to ensure a landscape plan was implemented and maintained in the interests
of visual amenity. 
There are no windows on the south gable of the proposed split-level dwellinghouse
and a 1.8m high close board timber fence is proposed on the boundary between the
existing and proposed dwellinghouse (south). The proximity of the timber fence and
the appearance of the blank gable will be overbearing and reduce daylight through
windows in the main ground floor living space of the neighbouring cottage. The
proposal will have a detrimental effect on existing residential amenity.  
The proposal is poorly designed and will be detrimental to residential amenity. The
proposal does not satisfy NPF4 Policy 14 Design, Quality and Place and LDP2
Policy 1 Placemaking and related Placemaking Supplementary Guidance (2020).  
Settlement Boundary  
LDP2 notes that a tight settlement boundary has been drawn to limit any significant
future growth of Keltybridge. The application site is not in the settlement boundary
and forms a distinctive boundary between the residential area of the village of
Keltybridge and open farmland.

Page 11

In respect of LDP2 Policy 6: Settlement Boundaries the site adjoins the boundary.
This policy states that development on sites that adjoin settlement boundaries will
only be permitted where the proposal is:  
(a) in accordance with Policy 8: Rural Business and Diversification and does not
adjoin a principal settlement boundary;
(b) justifiable on the basis of a specific operational and locational need and it can be
demonstrated that there are no suitable sites available within the settlement
boundary; or
(c) required to address a shortfall in housing land supply in line with Policy 24:
Maintaining an Effective Housing Land Supply: and
(d) will not result in adverse effects, either individually or in combination, on the
integrity of a European designated site(s).  
The proposed development does not meet any of the criteria above and therefore it
does not satisfy LDP2 Policy 6. Further, the proposal does not satisfy NPF4 Policy
16 Quality Homes as the site is not allocated in LDP2, it is not in the settlement
boundary and the proposal does not address identified gaps in provision.  
Brownfield  
NPF4 Policy 17 Rural Homes supports development for new homes in rural areas
which is suitably scaled, sited and designed to be in keeping with the character of
the area and the development reuses brownfield land where a return to a natural
state has not or will not happen without intervention (Policy 17 a(ii)). 
The Tree Survey reports 22 trees within the development site with some early
mature broadleaves and beech trees forming the eastern boundary as a
hedge/screen and records these as overgrown and elongated. The applicant’s
proposal outlined in 2020 is to rewild the site (20/00201/FLL). There is evidence that
the site has and will return to a natural state without intervention. 
The proposed dwellinghouse is poorly designed, is not in keeping with the character
of the area and there is evidence that the site is rewilding naturally. The proposal
does not satisfy NPF4 Policy 17a(ii) Rural Homes.  
The application form and the applicant’s supporting statement report the site as
brownfield. NPF4 Policy 9 Brownfield, vacant and derelict land and empty buildings
states at Policy 9a that development proposals that will result in the sustainable
reuse of brownfield land including vacant and derelict land and buildings, whether
permanent or temporary, will be supported. In determining whether the reuse is
sustainable, the biodiversity value of brownfield land which has naturalised should be
taken into account.  
The Design Statement considers the removal of contamination and the new
landscape proposals should significantly improve the quality of this part of the
village. 
As noted previously in the report, the site forms a distinctive boundary between the
residential area of the village of Keltybridge and open farmland. An attractive green

Page 12

edge to the settlement was to be retained and enhanced as part of the consent for
2no dwellinghouses (20/00201/FLL). The development requires the removal of 22no
trees and the Biodiversity Officer highlights that a Biodiversity Enhancement Report
has been submitted but without a baseline survey of the site. There are records of
red squirrel within 150m of the site and this should have ensured that an ecological
survey was submitted. In addition, mature trees in poorer condition may contain bat
roosts. 
The removal of 22no trees to enable the development of a dwellinghouse on the site
is not sustainable. There is evidence that the site has and is naturalising and is
therefore of biodiversity value. 
The proposal does not satisfy NPF4 Policy 9 Brownfield, vacant and derelict land
and empty buildings.  
Landscape and Visual Amenity  
The site was historically zoned as ‘village setting’ where agricultural uses or green
uses would be encouraged. The open view on the east side of Main Street, in
contrast to the built development on the west side, was part of the character of the
village and to be preserved. In historic development plans development northwards
on the east side of Main Street was considered to erode the character of the village
and therefore there was a presumption against built development on land within
which the site is located. 
The consent of 2no dwellinghouses to the south of the site was approved on the
basis that the application site would be retained as a green buffer to mitigate the
visual impact of the new dwellinghouses and would be enhanced by further planting
to provide an attractive green edge to the settlement on the east side of Main Street
as it transitioned into open farmland. 
To enable the development the removal of 22 trees on the site is proposed. The
Biodiversity Officer’s comments highlight that the trees offer an attractive tree belt
and although may not be good in terms of arboriculture, they will still be of
biodiversity benefit.  
The proposed development does not respect the village setting and the further
erosion of a green use on the site will have a detrimental impact on the character of
the village and visual amenity. 
Roads and Access  
Transportation and Development have no objection to the proposal. The vehicle
access to the public road network for the property will be via the existing vehicle
access off Main Street. Parking will be provided on site for two vehicles, which meets
the requirements of the National Roads Development Guide. 
Conditions are recommended to ensure further detail is submitted to show that
turning facilities shall be provided within the site to enable all vehicles to enter and
leave in a forward-facing gear and the vehicular access shall be formed in

Page 13

accordance with Perth & Kinross Council's Road Development Guide Type B Figure
5.6 access detail, of Type A Road construction detail.  
The proposal satisfies NPF4 Policy 13: Sustainable Transport and LDP2 Policy 60B:
Transport Standards and Accessibility Requirements: New Development Proposals,
subject to conditions.  
Drainage and Flooding  
Transportation and Development note that the applicant has advised that the foul
drain connection will be made to the Scottish Water Sewer and any works to connect
to the sewer will require the correct permits to be in place, prior to any works
commencing within the public road network. It is noted in the application response
from Scottish Water that only a foul connection can be supplied to the applicant,
therefore a surface water disposal strategy will need to be sought as there is no
connection for surface water from within the site. Planning conditions should ensure
that no surface water is discharged to the public road from the vehicular access and
that storm water drainage is disposed of by means of a Sustainable Urban Drainage
System in line with best management practices.  
The proposal satisfies LDP2 Policy 53B: Water Environment and Drainage: Foul
Drainage and Policy 53C: Surface Water Drainage, subject to conditions.  
Contamination  
The Contaminated Land Officer advised that a search of the historical mapping has
not identified any potential sources of contamination likely to impact upon the
proposed development site.  It shall be the responsibility of the applicant to satisfy
themselves that the ground conditions are suitable for the development for which
planning consent has been granted.    
The Coal Authority is a statutory consultee and were consulted as the site falls within
a defined Development High Risk Area. The Coal Authority records indicate that
within the application site and surrounding area there are coal mining features and
hazards which need to be considered in relation to the determination of this planning
application, specifically both actual and probable shallow coal mine workings and
probable shallow coal mine workings associated with a thick coal seam outcrop,
which may have been worked from the surface. Voids and broken ground associated
with such workings can pose a risk of ground instability and may give rise to the
emission of mine gases. 
The Coal Authority initially sent an objection to the application and considered that
the applicant should submit a Coal Mining Risk Assessment Report (response dated
27 April 2023). This report was received and submitted for review to The Coal
Authority on 2 June 2023. The Coal Authority noted that the Mine Workings
Remediation Report (August 2017, prepared by Groundshire Ltd), confirmed that
previously identified shallow mine workings beneath the site have been stabilised. As
a result, The Coal Authority withdrew its objection to the planning application
(response dated 8 June 2023).

Page 14

The application satisfies NPF4 Policy 9c Brownfield, Vacant and Derelict Land and
Empty Buildings and LDP2 Policy 58A: Contaminated and Unstable Land:
Contaminated Land and Policy 58B: Contaminated and Unstable Land: Unstable
Land.  
Conservation Considerations  
LDP2 Policy 27A: Listed Buildings requires the layout, design, materials, scale, siting
and use of any development which will affect a listed building or its setting to be
appropriate to the building’s character, appearance and setting. The proposed
development site is to the east of a terrace of category C listed cottages. While there
is no direct impact on the listed buildings, the proposed new dwellinghouse will
appear prominent in their immediate setting in views from the north. As highlighted
previously, the stone finish on the north elevation of the proposed new build will be a
prominent feature on the approach south into the village. 
The proposed development on a prominent site in the village will have a detrimental
effect on the setting of the listed buildings on the east side of Main Street.    
The proposal does not satisfy NPF4 Policy 7c Historic Assets and Places and LDP2
Policy 27A: Listed Buildings.  
Natural Heritage and Biodiversity  
NPF4 responds to a growing nature crisis and the sustainable use of natural assets
which has formed the foundations for the spatial strategy set out in the national
planning framework. The national policies relevant to the proposal include NPF4
Policy 1: Tackling the Climate and Nature Crisis, Policy 2: Climate Mitigation and
Adaptation, Policy 3: Biodiversity and Policy 6: Forestry, Woodland and Trees and
Policy 20: Blue and Green Infrastructure. These national planning policies give
significant weight to the global climate emergency, consider a healthy natural
environment is key to reducing emissions, aim to protect biodiversity and natural
assets and support the expansion of blue and green infrastructure. 
To enable the proposed development 22no trees are to be removed and an
indicative compensatory planting plan has been submitted. The indicative plan
proposes approximately 20no new trees on the east boundary of the site and 26no
trees are proposed off-site to the west. The exact details of the off-site provision are
unknown – specific detail was requested during the application process and no
response was received. Off-site provision is not acceptable, and the planning agent
was advised of this. 
The Biodiversity Officer highlights the trees will be of biodiversity benefit and that the
number of replacement trees is not in accordance with the non-statutory Planning
Guidance – Planning and Biodiversity. Further, no ecological survey of the proposed
development area or assessment of the likely effects from the development on
habitats and species was submitted. There are records of red squirrel, a protected
species, within 150m of the site and mature trees in poorer condition may contain bat
roosts.

Page 15

The loss of trees and habitat to enable the proposed development will have an
adverse impact on the natural environment and biodiversity including protected
species and lead to the fragmentation of an existing network of green infrastructure.  
The proposal does not satisfy NPF4 Policy 1: Tackling the Climate and Nature Crisis,
NPF4 Policy 2: Climate Mitigation and Adaptation, NPF4 Policy 3: Biodiversity, NPF4
Policy 6: Forestry, Woodland and Trees and NPF4 Policy 20: Blue and Green
Infrastructure and LDP2 Policy 1: Placemaking, LDP2 Policy 40B: Trees, Woodland
and Development, LDP2 Policy 41: Biodiversity and LDP2 Policy 42: Green
Infrastructure.  
Material Considerations  
1.Planning History 
The wider site has been subject to development proposals over a 20-year period
which have been assessed against the adopted development plan in place at the
time. The planning history is a material consideration, and a review of the relevant
applications is set out below -  
Planning reference 05/02299/FUL – Plot adjacent to 27 Main Street – Erection of a
dwellinghouse with potential for use as a guest house - Refused and Appeal
dismissed 27 June 2006.  
The development plan at the time comprised of the Perth and Kinross Structure Plan
2003 and the Kinross Area Local Plan 2004. The site was zoned in the Kinross Area
Local Plan as ‘Village Setting’ as land within which the continuance of agricultural
uses or ‘green uses’ would be encouraged to maintain the setting of the village.
There was a presumption against any form of built development. The appeal notice
noted that the site marks the transition from traditional properties to open countryside
on the east side of Main Street. It was recognised at the time as an area set aside for
‘village setting’ to be protected and retained as green open space despite its
previous past history of residential use and garden ground.  
Planning reference 12/01340/FLL – Plot adjacent to 27 Main Street – Erection of 4no
dwellinghouses – Withdrawn. The planning agent engaged with Planning to consider
the number of houses appropriate for the site and the design and layout prior to
submission of a further application.  
Planning Reference 13/02177/FLL – 2no dwellinghouses approved by Committee. 
The proposed development was assessed under the Perth and Kinross Local
Development Plan 2014 and Housing in the Countryside policy under the relevant
category ‘Rural Brownfield Land’. This was supplemented at the time by The
Housing in the Countryside Guide 2012. A historic map submitted by the applicant
showed the site was previously occupied by buildings and the site was overgrown
with hard-standing defined by hedging walls and trees.  The proposal was assessed
under this policy as small-scale development which would environmentally improve
the village by removing dereliction, spoil and foul drainage infrastructure.

Page 16

The proposed site plan shows that the area to north (application site) was to be
landscaped to create a green buffer and screen the proposed new cottage style
dwellinghouses and soften the visual impact. Condition 7 required the landscaping
and planting scheme to be implemented within 6 months of completion of the
development. A Notice of Initiation was received 15 July 2016.  
Planning Reference 17/01593/FLL – the revised design for the 2no dwellinghouses
to include front porches was approved. The report of handling highlighted that the
site is on the edge of the settlement boundary and contrary to policy PM4 of the
Local Development Plan 2014. However, it noted that the application was a change
in design on an extant permission for 2no dwellinghouses.  
The submitted landscape plan was the same as that submitted with 13/02177/FLL
with beech saplings on the field boundary to be maintained and enhanced with
further planting and a landscaped area to the north planted with native species to
increase local biodiversity. Condition 7 approved the landscape plan to be completed
within the first available planting season after the completion of the development or
bringing into use of the development whichever is earlier. 
Planning Reference 20/00201/FLL – 2no dwellinghouses (in part retrospect)
approved. The report of handling highlighted that the site is on the edge of
Keltybridge and as such Policy 6 Settlement Boundaries of the Local Development
Plan 2019 applies. This policy limits built development to being within the settlement
boundary.  The report noted that the proposal is contrary to that policy however the
extant permission is a significant material consideration that in this case outweighs
the adopted Development Plan.    
This application approved an enlargement to the porches (approved 17/01593/FLL)
as well as changes to the location of dormer windows to the front and rear of the
properties. The proposed site plan shows the area to the north to be left to rewild
and allow access to the septic tank through a padlocked gate. The report of handling
noted that limited information was provided as to how this revised landscape plan
would affect the previously approved landscape plan and the submission of a
detailed landscape plan and a landscape management plan were secured by
condition – Conditions 3 and 4 refer. No landscape plan or landscape management
plan have been submitted. Although the houses are completed and occupied no
notice of completion of development has been received for 20/00201/FLL.  
The planning history is a material consideration as it highlights the green use of the
site is a distinctive part of the character of the village and has been protected as
such. It also highlights that the plans to enhance the green use/buffer/landscaped
area on the application site have been diluted between the 2013 application and the
2020 application. A full landscape plan was initially proposed with the beech hedge
on the boundary to be retained and enhanced through the planting of native species
and further planting of native species proposed within the site. However, the
proposal shown in the application approved in 2020 is for the area of ground to
rewild naturally. Further, within the site there is an existing septic tank for housing on
the opposite side of the road and this was to be removed as shown on the original
plans, and the 2020 application shows an existing brick built septic tank and
soakaway to remain in the site.

Page 17

The submission of a landscape plan for review and approval by the Council as
Planning Authority was to enhance and protect the site as an attractive green buffer
between the new dwellinghouses and the edge of the village and the open farmland.
The site has been the subject of an enforcement enquiry on completion of the
dwellinghouses and enforcement action was put on hold due to the current
application and the previously withdrawn application for a dwellinghouse
(22/01945/FLL). It is proposed that the landscape planning conditions 3 and 4
attached to 20/00201/FLL are enforced to ensure that an attractive green buffer is
created and maintained on the edge of the village to protect its character and setting.  
The proposed dwellinghouse does not satisfy the development plan. The historic
protection and retention of the site for a green use is a material consideration and is
of sufficient weight to justify refusal of the application.  
2.Objections to the planning application  
Ten objections have been received to the application including one from the Cleish
and Blairadam Community Council. The Community Council objection noted the
planning history of the site and the potential loss of an area of amenity, biodiversity
and environmental quality in the local area. This potential loss of a local area of
environmental quality was repeated in the objection letters and that the proposal is
considered to directly contravene the original basis which the planning for the 2no
adjacent dwellinghouses was granted.  
The matters raised in the letters of objection are a material planning consideration
and of sufficient weight to justify refusal of the application. 
3.Applicant’s Supporting Statement  
A Design Statement was submitted with the application and further supporting
information was received during the application process including the applicant’s
response to the matters raised in the letters of objection.  
The further information states the 2-storey element will only be visible from the field
and that once the landscaping has matured the view of the house will be
considerably reduced. The applicant states the site is part of a wider site granted
planning consent under the Housing in the Countryside policy guidance as rural
brownfield land. The site is made-up ground and requires remediation – it contains
an old septic tank and is not rural greenfield land but rural brownfield. It highlights
that in terms of sustainability it is important to use brownfield land rather than
greenfield for new housing and references NPF4. The proposed dwellinghouse will
allow full remediation of the site with the removal of the old septic tank and made-up
ground. In respect of rewilding, the statement highlights that rewilding without
removing any contamination from past uses is not sustainable.  
In response, at the time of the original application for 2no dwellinghouses the site
was considered brownfield in respect of the Perth and Kinross Local Development
Plan 2014 in place at the time. As noted in the planning history above, the
subsequent applications to modify the design of the dwellinghouses were contrary to

Page 18

development plan policy as the site is not in the settlement boundary. The extant
permission was a material consideration. 
The matters raised in the applicant’s supporting information have been addressed in
the report above and the current application does not satisfy NPF4 and the Perth
and Kinross Local Development Plan 2019.  
There are no material considerations to justify approval of the application.  
Developer Contributions  
The Developer Contributions Guidance is not applicable to this application and
therefore no contributions are required in this instance.  
Economic Impact  
The economic impact of the proposal is likely to be minimal and limited to the
construction phase of the development.  
VARIATION OF APPLICATION UNDER SECTION 32A 
This application was not varied prior to determination.  
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS  
None required.    
DIRECTION BY SCOTTISH MINISTERS  
None applicable to this proposal.  
CONCLUSION AND REASONS FOR DECISION  
To conclude, the application must be determined in accordance with the
Development Plan unless material considerations indicate otherwise.  In this respect,
the proposal is considered to be contrary to the Development Plan.  Account has
been taken of the relevant material considerations and none has been found that
would justify overriding the Development Plan.  
Accordingly, the proposal is refused on the grounds identified below. 
Reasons 
1. The proposed development will have a detrimental impact on the distinct
character and visual amenity of the village. The proposed development is
poorly designed, will be detrimental to residential amenity and will not
contribute positively to the surrounding built and natural environment. The
proposal is not consistent with the six qualities of successful places. The
proposal does not satisfy NPF4 Policy 14 Design Quality and Place and LDP2

Page 19

Policy 1 Placemaking and related Placemaking Supplementary Guidance
(2020).  
2. The site is not an allocated housing site in LDP2, it is not in the settlement
boundary of Keltybridge and the proposal does not address an identified gap
in provision and therefore the proposed development does not satisfy NPF4
Policy 16 Quality Homes and LDP2 Policy 6: Settlement Boundaries.  
3. The removal of the majority of trees on the site to enable the development of
a dwellinghouse is not sustainable as there is evidence that the site has and
is naturalising and is of biodiversity value. The proposal is poorly designed
and is not in keeping with the character of the area. The proposal does not
satisfy NPF4 Policy 9 Brownfield, Vacant and Derelict Land and Empty
Buildings and NPF4 Policy 17a(ii) Rural Homes.  
4. The poorly designed proposal on a prominent site in the village will have a
detrimental effect on the setting of the listed buildings on the east side of Main
Street. The proposal does not satisfy NPF4 Policy 7c Historic Assets and
Places and LDP2 Policy 27A: Listed Buildings.  
5. The loss of trees and habitat to enable the proposed development will have
an adverse impact on the natural environment and biodiversity including
protected species and lead to the fragmentation of an existing network of
green infrastructure. The proposal does not satisfy NPF4 Policy 1: Tackling
the Climate and Nature Crisis, NPF4 Policy 2: Climate Mitigation and
Adaptation, NPF4 Policy 3: Biodiversity, NPF4 Policy 6: Forestry, Woodland
and Trees and NPF4 Policy 20: Blue and Green Infrastructure and LDP2
Policy 1: Placemaking, LDP2 Policy 40B: Trees, Woodland and Development,
LDP2 Policy 41: Biodiversity and LDP2 Policy 42: Green Infrastructure.  
Justification  
The proposal is not in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan.  
PLANS AND DOCUMENTS RELATING TO THIS DECISION  
01  
02  
03  
04  
05  
06  
07

Page 20

08  
09  
10

Page 21

No embedded text on this page.

Page 22

No embedded text on this page.

Page 23

No embedded text on this page.

Page 24

No embedded text on this page.

Page 25

No embedded text on this page.

Page 26

No embedded text on this page.

Page 27

No embedded text on this page.

Page 28

No embedded text on this page.

Page 29

No embedded text on this page.

Page 30

No embedded text on this page.

Page 31

No embedded text on this page.

Page 32

No embedded text on this page.

Page 33

No embedded text on this page.

Page 34

No embedded text on this page.

Page 35

No embedded text on this page.

Page 36

No embedded text on this page.

Page 37

No embedded text on this page.

Page 38

No embedded text on this page.

Page 39

No embedded text on this page.

Page 40

No embedded text on this page.

Page 41

No embedded text on this page.

Page 42

No embedded text on this page.

Page 43

No embedded text on this page.

Page 44

No embedded text on this page.

Page 45

No embedded text on this page.

Page 46

No embedded text on this page.

Page 47

No embedded text on this page.

Page 48

No embedded text on this page.

Page 49

No embedded text on this page.

Page 50

No embedded text on this page.

Page 51

No embedded text on this page.

Page 52

No embedded text on this page.

Page 53

No embedded text on this page.

Page 54

No embedded text on this page.

Page 55

No embedded text on this page.

Page 56

No embedded text on this page.

Page 57

No embedded text on this page.

Page 58

No embedded text on this page.

Page 59

No embedded text on this page.

Page 60

No embedded text on this page.

Page 61

No embedded text on this page.

Page 62

No embedded text on this page.

Page 63

No embedded text on this page.

Page 64

No embedded text on this page.

Page 65

No embedded text on this page.

Page 66

No embedded text on this page.

Page 67

No embedded text on this page.

Page 68

No embedded text on this page.

Page 69

No embedded text on this page.

Page 70

No embedded text on this page.

Page 71

No embedded text on this page.

Page 72

No embedded text on this page.

Page 73

No embedded text on this page.

Page 74

No embedded text on this page.

Page 75

No embedded text on this page.

Page 76

No embedded text on this page.

Page 77

No embedded text on this page.

Page 78

No embedded text on this page.

Page 79

No embedded text on this page.

Page 80

No embedded text on this page.

Page 81

No embedded text on this page.

Page 82

No embedded text on this page.

Page 83

No embedded text on this page.

Page 84

No embedded text on this page.

Page 85

No embedded text on this page.

Page 86

No embedded text on this page.

Page 87

No embedded text on this page.

Page 88

No embedded text on this page.

Page 89

No embedded text on this page.

Page 90

No embedded text on this page.

Page 91

No embedded text on this page.

Page 92

No embedded text on this page.