PPF 2022 v1.4 final version, 16/09/2022 Pre-Agenda Briefing of the Planning, Protective Services and Licensing Committee

Argyll and Bute Council · 28 September 2022
Back to Planning, Protective Services and Licensing Committee — 28 September 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.

Page 1

2021/22
PLANNING
PERFORMANCE
FRAMEWORK 11
Appendix 1

Page 2

About Argyll and Bute
Population (2019):
85,570 9% 
Argyll and Bute as
a proportion of the
total Scottish land
area.
Average Pop. Density (2019):
0.12 persons per ha
43% 
of Argyll and Bute’s
Population live in
areas classified as
“remote rural”.
21
inhabited islands* 
Bute, Coll, Colonsay,
Danna, Easdale, Eilean
da Mheinn,  Erraid,
Gigha, Gometra, Iona,
Islay, Jura, Kerrera,
Lismore, Luing, Mull,
Oronsay, Seil, Shuna
(Luing), Tiree, Ulva 
* not including LLTNP area
96% 
of Argyll and Bute’s
population live within
10km of the coast.
52
of Argyll and Bute’s
125 data zones are
amongst the 20%
most geographically
access deprived
data zones in
Scotland.
Scottish Index of Multiple
Deprivation 2020
£536
average weekly
income 
Compared to Scottish
Average of £577, and
UK Average of £688
(2019)
33%
of employment is in
“Public
Administration,
Education and
Health”
Compared to 29.8% in
Scotland, 26.4% in UK (2018)

Page 3

Argyll and Bute Key Challenges:
Our geography – A highly rural area with many small communities, often separated by water.
Access to the area and to key services are perennial challenges.
Reducing population – The projected decline in total population is a real threat to the viability of
the area with a potential to adversely impact on the economy/wealth creation, workforce
availability and efficient service delivery.
Changing population – With more extremes than most of Scotland we face increasing costs
and challenges to deliver services to older people and we need to encourage younger people to
move to the area so that our economy can grow.
Economy – Unlocking the opportunities offered by its significant, sustainable economic assets
for the benefit of its communities and the competitiveness and security of the Scottish and EU
economies.
Employment – Developing education, skills and training to maximise opportunities for all and
create a workforce to support economic growth.
Infrastructure – Improving and making better use of infrastructure in order to promote the
conditions for economic growth including enhancing the built environment and our town centres.
Sustainability – Ensuring a sustainable future by protecting the natural environment and
mitigating climate change.
Health –Improving health and well being and reducing health inequalities.
Deprivation –Inequalities exist in Argyll and Bute so we need to improve how we identify and
implement action to address them. 
People on the fringe – Many of our communities are very isolated and risk collapsing as
population changes take affect alongside urban communities where deprivation can create real
hardships.
Arrinagour, Isle of Coll

Page 4

As the Head of Development and Economic Growth, I am pleased
to submit the annual performance report for Argyll and Bute
Council’s Planning Service, which provides relevant statistics for
2021/22 and case studies highlighting the work of the council’s
planning service that forms part of the wider Development and
Economic Growth Service of the council. This 11th Planning
Performance Framework report is written at a time of
unprecedented challenges.  The need to address climate change,
the impacts of the pandemic, a cost of living crisis, together with a
critical shortage of skilled workers is placing a significant pressure
on the planning service in terms of our performance.
Our workforce is moving to hybrid working with face to face
meetings increasingly common. That said, our main
communication with our many customers remains predominately
through digital channels and this will be the norm going forward as
we rationalise and adapt our offices to new ways of working.   
Workload levels remain high across the service, dealing with
backlogs due to the pandemic, adapting to the new requirements
from the Planning Act, responding to Government consultations
including NPF4, taking forward the Local Development Plan through a Public Local
Inquiry, dealing with an increasing workload of complex planning applications including
major investments in renewables, food and drink, housing and tourism.  This rising and
increasingly complex workload has been made more challenging by our difficulty in
attracting experienced Planners with the right skills to improve our performance as a
Planning Service. 
This situation is reflected in our overall performance, whilst our approval rates remain high
at 98% our performance in determining planning applications this year is not yet in the
place where we want to be.  This situation is compounded further by our need to address
long standing legacy applications that when determined inevitably impact negatively on
our overall planning application decision averages.   
Striking a more positive note, our area regeneration efforts continue to help transform our
region, creating great places for people to live, to invest in and importantly for us to visit
given the dominance of the tourism sector in our economy.  The Planning Service working
closely with the Council’s Economic Growth and Housing Services has played a key role
here, helping new homes to be built, new businesses to start, buildings to be repurposed
and facilitating the expansion of major renewable energy projects.  Key projects include
the development of the Dunbeg Corridor and the building of housing on former areas of
the Helensburgh Greenbelt, the delivery of key infrastructure on our islands, the
repowering of on shore wind farms in Kintyre, the continued expansion of our forest,
aquaculture and the spirits industries.  
This work will continue and has considerable potential to expand further given the
continued delivery of our Rural Growth Deal and taking account of recent Levelling Up
Bids to the UK Government focussing on regeneration in Rothesay and Dunoon town
centres. 
Foreword:
Fergus Murray
Head of Development &
Economic Growth
Argyll and Bute Council
3

Page 5

Contents:
Planning Performance Framework Report 2021/22
Foreword P3
Part 1: Defining & Measuring a High Quality Planning Service 
Part 2: Supporting Evidence & Performance Markers P31
Part 3: Service Improvements P35
Part 4: National Headline Indicators (NHI’s) 2021/22 P36
Part 5: Official Statistics P38
Part 6: Workforce Information P40
Part 7: Planning Committee Information P42 
Case Study 1:  Welcome to Bute P8 
Case Study 2:  ACT-ing Together: Compensatory Planting P9 
1.2 Quality of Service and Engagement P11 
Case Study 3:  Dunbeg Masterplan - Update 2022 P15 
Case Study 4:  Bringing Empty Homes Back Into Use P17 
1.3 Governance P19 
Case Study 5:  DM Response to Covid-19 Update 2022 P22 
1.4 Culture of Continuous Improvement P25 
Case Study 6:  CCDC Masterplan for Scalasaig P29 
1.1 Quality of Outcomes P5

Page 6

Defining and Measuring
a High Quality Planning
Service Part 1:
1.1 QUALITY OF OUTCOMES
1.1.1  Throughout 2021/22 the Planning Service has continued to work closely with
communities, developers and partner organisations to deliver a range of developments across
Argyll and Bute.
1.1.2  The adopted Argyll and Bute Local Development Plan 2015 (the LDP) is firmly
embedded into decision making with 12 key policies which seek to promote the delivery of
sustainable long term economic growth to support the retention and growth of our population; to
support the transition to a low carbon economy; to help retain and improve essential services;
to protect and enhance our outstanding natural and built environment, and to maintain and
improve our quality of life. Whilst the LDP is now more than five years old it is still considered fit
for purpose in terms of decision making and will remain so until it is replaced by the Argyll and
Bute Proposed Local Development Plan 2 (PLDP2) which is now at an advanced stage in its
preparation and has reached Examination stage.
1.1.3  Interpretation and implementation of the LDP policy aims is assisted by a suite of
Supplementary Guidance and non-statutory Technical Working Notes. These include
publications on: Masterplanning, Advertisement and Signage Policy, Houses in Multiple
Occupation, and a Biodiversity Technical Note for Planners and Developers. In 2021/22 we
published non-statutory guidance on the handling of requests for Non-Material Amendments
under S64 of the Act was updated. Advice for communities interested in Local Place Plans was
published also online during 2021/22. 
1.1.4  The Council seeks to promote high quality design through the publication of
Sustainable Design Guidance covering a range of topics including Small Scale Housing
Development, Larger Housing Development, Working with Argyll and Bute’s Built Heritage,
Case Studies on Sustainable Materials and Technologies, and place specific guidance for the
unique circumstances of the Islands of Coll and Tiree. Delivery of quality in design and place
making is celebrated and championed through the Council’s Sustainable Design Award scheme
and identification of exemplar designs via the Council’s website. The most recent iteration of the
Sustainable Design Awards was launched in February 2020 but has subsequently been
postponed as a result of the Covid-19 pandemic. To date it has not been possible to re-
schedule. However, subject to availability of resources, it is hoped that this will be re-instigated
by Summer 2023. The Design Awards 2020 were intended to recognise work that was carried
out or completed in the period July 2015 to May 2020, however this will be subject to review at
an appropriate time. The proposed award categories have been identified as Sustainable
Design, Aesthetic Design, Community Led Regeneration Project, Built Heritage, and Design for
Under £100k. The range of categories are intended to highlight good practice across varying
scales and types of development, and include for the promotion of low cost-innovative design,
and community led developments.
Planning Performance Framework Report 2021/22
5

Page 7

1.1.5  There are 33 Conservation Area designations across Argyll and Bute providing
protection to the historic built environment. Where resources allow, the Council seeks to
review and update the Conservation Area Appraisal and Character Evaluations that underpin
the management of these designations and to support regeneration activity.
1.1.6  Through considered and targeted investment, the Council is continuing to develop,
deliver and distribute funding to regeneration projects, the foundations of which support more
attractive and prosperous places. During 2021/22, we have developed a bespoke website which
highlights the many ongoing and completed regeneration projects which are being delivered by
teams across Argyll and Bute Council as well as by community groups. Further information can
be found at https://investinargyllandbute.co.uk/physical-regeneration-in-argyll-and-bute/. The
projects which were developed and delivered by the Projects and Regeneration Team during
2021/22 are as follows:
Dunoon CARS  - partnership project with Historic Environment Scotland. To date this has
delivered the completion of 3 priority buildings and 22 shopfronts, with 6 units brought back into
use, and 7 Owners Associations formed with a total investment spend of £1.9m. During 2021/22
an allocation of £70,000 was made from the Place Based Investment funds towards
improvements to the area surrounding Castle House Gate Lodge. Delivery of the CARS is
continuing through 2022/23. 
Rothesay TH2  - partnership project with National Lottery Heritage Fund, Historic Environment
Scotland, Highlands & Islands Enterprise, LEADER and SUSTRANs. To date this has delivered
completion of 8 priority buildings, 14 shopfronts, 10 small repairs and 2 window projects with total
investment spend of £5.4m. The project is ongoing until the end of March 2023 due to delays
arising from the Covid-19 pandemic. The project was supported by a grant of funding by the
Place Based Investment during the year to help assist with rising construction costs. 
Lochgilphead CARS - - partnership project with Historic Environment Scotland with total
investment spend of £1.8m.  First priority buildings are expected to be on site during 2022/23. 
First small repair grant has been awarded with other cases being developed.  A number of
training activities have taken place including a traditional skills roadshow across 4 towns and a
seminar on how to heat older properties. 
Lochgilphead Front Green / Lochgilphead Public Realm Works - Following completion of the
Argyll Street public realm improvements during 2020/21 (see previous PPF), work commenced on
the £1.6m investment planned for the redevelopment of the Front Green in May 2021, the project
is delivering a new play park, pathways, a public square and open space. The site is identified as
an Area for Action within the Local Development Plan. Works are planned to complete during
2022/23. 
Tarbert / Ardrishaig Regeneration - Regeneration projects in Ardrishaig are informed by outcomes
from the Crinan Canal Corridor Charrette joint working with Scottish Canals which we reported on
in PPF 5 and PPF 6. In PPF 9 we reported on the completion of the Ardrishaig Harbour
Regeneration project, The Egg Shed has since been recognised by the Royal Incorporation of
Architects in Scotland (RIAS) in their 2021 awards. During 2021/22 development work related to
the Ardrishaig North Public Realm project has continued and works are planned to take place
during 2022/23. Works have been delayed as a result of increased construction costs associated
with issues around the Covid-19 pandemic, Brexit and the war in Ukraine. 
Town Centre Fund - The team has continued to implement projects which were funded through
Town Centre Funding and have completed works in Rothesay to provide a covered seating area
6
Planning Performance Framework Report 2021/22

Page 8

and ‘Welcome to Bute’ sign which aim to help support the recovery of local businesses and
raise the profile of the Island of Bute - see Case Study 1. Town Centre Funding has been
superseded by Place Based Investment (PBI) funding, which the Scottish Government has
committed to allocating on an annual basis over a five year period. Projects committed within the
2021/22 period are as follows:
Region-wide shopfront scheme aimed for small and micro businesses in rural and smaller
settlements. Deadline for applications closed at the end of December 2021, with a total of
£80,000 awarded to 16 businesses to carry out improvement works, works are now largely
completed. 
£250,000 towards public realm improvements in Gibraltar Street, Oban. This project will provide a
bright, contemporary gateway into the Oban town centre, improve access and encourage people
to shop locally. Design work was commenced during 2021/22 and are currently being finalised for
the site with delivery planned for 2022/23. 
A third party grant of £50,000 to support the Dunoon Burgh Hall Trust through the creation of an
attractive outdoor garden café area to the rear of the building, designed to boost income
generation potential and the sustainability of Dunoon Burgh Hall. The immediate area to the rear
of the Burgh Hall would be tackled as an initial phase, then further developed should additional
funding allow.
A £300,000 investment towards enhanced hard landscaping and lighting of the masonry pier
section of Helensburgh Pier. The project follows on the from the Council’s £22 million
Helensburgh Waterfront Development project as it will uplift the pier’s visual appearance
including the views looking out from the new swimming pool and gym. Delivery is planned for
2022/23.
Hermitage Parks for People - £3.7m project for the heritage-led regeneration of Hermitage Park.
The project has been part funded by National Lottery Heritage Funding and is now reaching its
final phase of implementation and is programmed for completion in December 2022 (extended
due to the Covid-19 pandemic). In addition to work reported in the previous PPF, the project has
delivered assorted areas of new or improved planting and a demonstration garden with bespoke
volunteer bothy (with funding from Place Based Investment). In June 2022 Hermitage Park was
awarded its third consecutive Green Flag status recognising not only the park’s green credentials
but also the involvement of the community and educational link to the University of the Highlands
and Islands. 
Helensburgh CARS - Funding secured in March 2021 for a £3m heritage-led regeneration project
in partnership with Historic Environment Scotland. Three priority buildings have been identified
and in partnership with the accredited architect all owners have been met and CARS Funding
discussed.  Two small repairs projects have also been identified and are being progressed. 
There have been 6 expressions of interest regarding the replacement of shopfronts and these are
being progressed with costs.  A traditional skills day was hosted at Hermitage Academy in
conjunction with Developing Young People skills included roof slating, stone carving, surveying
via VR with positive feedback received via the school and the young people who took part “I’m
continuing to hear positive comments from the day - we even have a young person who wasn’t
engaging in school who showed up on Friday, loved the activities that much he has now signed
up to the Tullochan Trust’s “Furniture Fix” social enterprise to develop his skills further and plans
to apply for a joinery apprenticeship towards the end of the year… I am chuffed that a young
person who had no pathway lined up has now taken these steps off the back of our event”.
Further training events are planned for September 2022. 
7
Part 1 continued on P. 11

Page 9

Welcome to Bute Case Study 1
Using Scottish Government Town Centre Funding, Argyll and Bute Council supported community
ambitions through delivery of a bespoke sculptural welcome sign and an all-weather canopy.
Both projects have involved strong collaboration with the Bute Community Council, Isle of Bute
BID and elected members through design and delivery stages. 
The new bespoke welcome sign is located in the Winter Gardens in Rothesay aimed to
encourage visitors to take photographs and share the Bute welcome on social media to the rest
of the word. Promoting Bute as a visitor destination and creative new visitor attractions are long-
held aspirations of the local community and businesses. A welcome sign was a key action set out
by Audience Development work in 2019 from the Rothesay Townscape Heritage Programme.
The location of which captures the architecture of the Victorian seaside town, the formal
waterfront gardens, as well as the Firth of Clyde and hills behind. 
To further support local businesses, a new all-weather canopy has now been installed at
Montague Street Gardens, Rothesay. The canopy enables businesses to extend a typical season
by offering residents and visitors cover for dining and events. Both projects were aimed at
attracting more people of the Isle of Bute and extending the tourism season which will help with
ongoing economic recovery from the impact of the COVID pandemic.
Project officers were supported by Development Management Team through providing quality
advice on the planning requirements of the projects and ensuring it was within tight funding
deadlines. 
The projects have contributed to the wider goals and outcomes of the planning service through
supporting the delivery of town centre regeneration and place-making projects which support
Argyll and Bute to become a more attractive and prosperous places to work, live, visit and do
business. It has also been demonstrated that delivering physical improvements to our built
environment can make our area a more attractive place to live, work and invest in. Feedback
from the community has outlined the success of both projects, with the canopy used regularly by
businesses as cover for alfresco dining and locals for events and festivals. The welcome sign has
been drawing in visitors
and has led to them
sharing their photographs
on social media helping to
raise the profile of Bute.
Both projects have
succeeded in the aim of
helping to extend the
tourism season on the Isle
of Bute and help local
businesses recover from
the impact of the COVID
pandemic. 
8
Themes A: Quality of
Outcomes
B: Quality of
Services & 
Engagement
C: Governance
D: Culture of
Continuous 
Improvement
Performance 
Markers 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Key Areas of Work  Regeneration, Town Centres
Stakeholders  Argyll & Bute Council, Bute Community Council, Isle of Bute BIDS
Project Lead  Genna Lugue

Page 10

ACT-ing Together:
Compensatory Planting Case Study 2
9
Themes A: Quality of
Outcomes
B: Quality of
Services & 
Engagement
C: Governance
D: Culture of
Continuous 
Improvement
Performance 
Markers 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Key Areas of Work  Climate Change, Biodiversity, Collaborative Working
Stakeholders Argyll and Bute Council, Argyll & the Isles Coast and Countryside Trust,
Scottish & Southern Energy Network Transmission
Project Lead Matt Mulderrig
Argyll and Bute Council have joined forces with SSEN Transmission and leading community and
conservation organisation, Argyll and the Isles Coast and Countryside Trust (ACT), to help
deliver SSEN Transmission’s compensatory tree planting commitments and in doing so, help
support and enhance Scotland’s rainforest in Argyll. The partnership was initiated following a
recommendation from the Planning Service (who were engaged on the S37 project from pre-
application through to discharge of conditions) that the Council’s aspirations for management of
its own woodlands might offer scope for SSEN to deliver offsite replacement planting across
Argyll.
ACT is a community-led organisation and registered charity, established in 2014. Their mission is
to sustainably maintain, enhance and promote the coast and countryside of Argyll and the Isles. 
Argyll's rainforest, also known as Atlantic
woodland, temperate rainforest or Celtic
rainforest, is a unique and rare habitat of
ancient and native woodland, open glades,
boulders, rocky cliffs and river gorges. 
Scotland is now the last stronghold for this
habitat that was once widespread along the
Atlantic coast of Europe.  The mild, wet
climate of the west coast of Scotland
provides perfect growing conditions for this
diverse habitat that supports a variety of
plants and animals.
The ground-breaking partnership will see
ACT help deliver SSEN Transmission’s
compensatory tree planting relating to its
Inveraray-Crossaig reinforcement project
which involve the construction of a new
275kV overhead line to provide capacity to
connect wind farm development to the
electricity network. The project is 81km in
length and has potential to impact upon
almost 460ha of woodland.
Planning Performance Framework Report 2021/22

Page 11

The initial phase of compensatory planting is underway on Argyll and Bute Council’s sites
near Lochgilphead in Argyll.  By planting native species, the planting will support local flora
and fauna, creating natural habitats for native species to thrive, supporting SSEN
Transmission’s commitments to deliver biodiversity net gain and compensatory planting on all its
major projects.  
The planting will also create a natural asset for the local community to enjoy for generations to
come, leaving a positive lasting legacy beyond SSEN Transmission’s primary objective of
delivering a network for net zero emissions across the north of Scotland.
Richard Baldwin, Head of Consenting and the Environment for SSEN Transmission, said:
“I’m really excited about our partnership with ACT to deliver our compensatory planting for our
Inveraray-Crossaig project.  By working in partnership with local experts we can ensure our
compensatory planting focusses on the right species, in the right locations, to deliver the right
outcomes for the local communities in which we operate. 
“Argyll’s rainforests are a truly stunning and precious resource and we’re delighted to be playing
a small part in helping ensure the long term sustainability of this nationally significant natural
asset.  You can’t help but be mesmerised when you first discover Argyll’s rainforest and ACT’s
dedication and passion to protect and enhance this wonderful natural asset is great to be part of.  
“As we continue to deliver a network for net zero emissions across the north of Scotland, we are
committed to doing so in a responsible and sustainable way, helping sustain and enhance the
local habitats in which we operate. We look
forward to building on this initial planting
project with ACT and other community
organisations across the north of Scotland,
leaving a positive legacy for generations to
come.”
Ross Lilley, ACT Chairman, said:
“This partnership with SSEN Transmission
and Argyll and Bute Council has been a
very significant one for ACT as we’ve been
able to create new native woodland sites
which is an important part of Argyll’s
Rainforest Strategy.  
“By improving existing woodland, as we have recently done at Kilmory and Glenan woods with
extensive Rhododendron ponticum removal, and gradually linking up the clusters of Rainforest
with new planting, we can create corridors for the rare species that are unique to our Rainforest
habitat to thrive.  
“Argyll is incredibly fortunate to be home to more than half of Scotland’s rainforest and to ensure
that it is safeguarded, we will need a partnership approach from businesses, communities and
agencies.  This agreement between SSEN Transmission, ACT and Argyll and Bute Council is a
great example of what can be achieved.”
Ross Mclaughlin, Head of Commercial Services at Argyll and Bute Council said:
“It’s important that we take all steps we can to make day-to-day life in Argyll and Bute climate-
friendly. We are pleased therefore to support this woodland conservation initiative. Becoming
climate-friendly is about developing sustainable ways of living and working, to protect the planet
on which we all depend for our future generations.”
10
Ross McLaughlin ABC; Ross Lilley, ACT;
Richard Baldwin SSEN

Page 12

Crown Estate Funding - we have administered funding received from the Crown Estate to a
number of community projects and during 2021/22 the ACT Hub was completed by the Argyll
and the Isles Coast and Countryside Trust. The building is to be their main base as they look
to deliver environmental and climate change work across Argyll. Other projects are ongoing. We
have continued to work on securing funding which can be used to deliver improvements across
Argyll and Bute. Funding was allocated to a number of community projects through the
Regeneration Capital Grant Fund during 2021/22 including Obair Ùr Thirodh – Tiree Community
Business Hub (£565,000), Kerrera Old School - Community Hub Final Phase (£285,000), and
Ulva Ferry Shore Facilities Building - Doras Caolas Ulbha (£603,000) these projects are to start
delivery during 2022/23. We have also been preparing a bid for the Levelling Up Fund which, if
successful, would focus on delivering projects in Dunoon and Rothesay. 
1.1.7  Involvement of the Planning Service has been instrumental in facilitating a number of
developments which have/will deliver new housing, schools, employment, renewable energy, and
tourism accommodation/facilities. 
1.2 QUALITY OF SERVICE AND ENGAGEMENT
1.2.1  The LDP and priorities of the Planning Service are closely aligned with the Argyll and
Bute Outcome Improvement Plan 2013-23 (previously known as the Single Outcome Agreement
and Community Plan). The Outcome Improvement Plan remains the sovereign document and the
LDP aims to translate its objectives in to a deliverable spatial strategy. The Council’s Action
Programme is utilised to focus action on priority proposals and allocations, and to identify work
which is required to enable development. The Council’s internal key performance indicators for
the Planning Service all directly tie in and seek to demonstrate a contribution to delivery of the six
long term outcomes identified in the Outcome Improvement Plan. Case Study 3 & 6 provide an
example of these corporate aims being delivered on the ground by LDP policy.
1.2.2  During 2021/22 preparation of PLDP2 has focussed on final preparation of electronic
documentation for submission to the Scottish Government for an Examination of PLDP2. All
documentation was submitted early 2022 and subsequently the DPEA has issued a statement of
conformity. The Examination is currently underway. In addition the Development Policy team has
fully engaged with the Scottish Government on NPF4. An updated  project plan for the
Development Plan Scheme was published in March 2022.
1.2.3  The Planning Service is located in various offices across the main settlements of Argyll
and Bute providing relatively easy access to a large proportion of the population. Customers on
remoter mainland and island locations are also able to access Council services at Customer
Service Points. The Planning Service also provide website, e-mail, and telephone based services
to customers, and continues to utilise social media as a means of public engagement. The
Council’s response to the Covid-19 pandemic involved the temporary closure of public offices
and delivery of planning services via home working and digital communication channels; these
arrangements have continued throughout 2021/22. The Planning Service has engaged within a
wider corporate discussion within the Council on ‘Our Modern Workplace’ that is exploring the
potential to review future workplace arrangements through permanent home working / hybrid
working arrangements, and rationalisation of the Council’s portfolio of office accommodation.
1.2.4  The Planning Service, working in partnership with Regulatory Services, initially
attained the  Customer Service Excellence Standard in February 2019. An overview of the work
11
Planning Performance Framework Report 2021/22

Page 13

undertaken to reach this attainment was set out in PPF 8. The CSE Standard was retained
following reassessment and confirmed in April 2021.
1.2.5  The Planning Service continues to build partnerships both internally and externally.
The Development Policy and Development Management teams have close links and seek to co-
ordinate activity/resources with Economic Growth, Projects and Regeneration, Building
Standards, Environmental Health, Strategic Transport, Housing, Access, GIS and Coastal
Development through revised management arrangements for these functions which has seen
them brought under a single Head of Service from July 2019. Departmentally the Planning
Service is also aligned with Roads and Infrastructure under a single Executive Director. The
Council Service structure facilitates partnership working and promotes symbiosis in working
practice including the merging of Housing with Development Policy to better realise the synergies
between these services in the delivery of effective affordable housing development and the
Strategic Housing Investment Plan (SHIP). Over the past year the Housing and Development
Policy teams have worked closely together to develop an updated Housing Needs and Demand
Assessment (HNDA) which formed the basis of housing calculations submitted to the Scottish
Government to inform the housing land requirement set by the draft NPF4. The approved HNDA
has been approved by the CMHA and commended for its methodology. The HNDA has also
informed the refreshed Local Housing Strategy which was launched at the beginning of 2022 and
the updated SHIP.
1.2.6  Customer User Forums are held regularly as a joint exercise between the
Development Management, Development Policy and Building Standards Services providing a co-
ordinated approach to engagement with regular professional customers. The content of recent
User Forums include updates on the PLDP2 process, validation standards, updates on changes
to legislation, details of any revision to staffing and service delivery arrangements,  performance
appraisal, and details of recent publications/guidance. Customer User Forums have not been
held during the pandemic but is currently intended to be reinitiated later in 2022 as a virtual
event.
1.2.7  In addition to engaging with individual companies on application specific issues, the
Planning Service also seeks to engage directly with the aquaculture industry by arranging an
annual liaison meeting with local industry representatives with hosting arrangements alternating
between the Council and Industry. The event intended for 2019/20 was due to be organised and
hosted by the Scottish Salmon Producers Organisation and has still to be revived following the
Covid-19 pandemic. The agenda for the last meeting in 2018/19 meeting included an update on
LDP2, the Clyde Marine Plan, Planning Performance, revised Industry Planning Protocols,
discussion about changes to SEPA’s licensing regime and its implications for planning, wild fish
interactions, and updated EIA Regulations. 
1.2.8  The Development Policy Service has developed a remote based assessment of
housing land supply in order to verify that it is fit for purpose and does not act as an impediment
to the delivery of new house building. This has allowed us to carry out a survey despite
‘lockdown’ restrictions. The Council continues  to explore innovative ways in which it can
contribute to or facilitate the further delivery of a variety of housing types as reported in PPF 7.,
and is meeting regularly with all local Registered Social Landlords (RSLs) to identify working
groups as appropriate to find tailored solutions for site specific development impediments.  A
quarterly Housing Forum is chaired by the Leader of the Council and we also now have a forum
with Community Housing Trusts with planning being an agenda item for both groups.
1.2.9  The Council remains supportive of national efforts to roll out improved communications
infrastructure. The Council’s Digital Liaison
12
Planning Performance Framework Report 2021/22

Page 14

Officer continues to provide assistance and single point contact for numerous consultants
and monitors progress of telecommunications planning applications as they are developed,
submitted and implemented, following internal protocols to engage planning officers with
greater expertise in telecoms development when required. Feedback from consultants has been
complimentary of the processes which the Council have implemented to assist in the progress of
digital connectivity. EE/BT have previously commented  positively on the streamlined process
that the Planning Service have implemented in assisting in network coverage development. It has
also been highlighted internally that cross departmental working will be intrinsic to the successful
development of improved fibre penetration into rural communities given the challenges and, in
some cases, short timeframes for implementation.
1.2.10  The Council recognises that it cannot work in isolation and that collaborative working
will deliver the most productive outcomes for communities. Area regeneration efforts require
substantial involvement from the community as a whole, and relies on private and third party
partnerships and subsequent investment. The Council has previously reported on ongoing
collaborative work with a number of housing sector partners to identify solutions that continue to
deliver new homes where and when they are needed. Amongst others this includes Mull and Iona
Community Housing Trust who have completed detailed research on Key Worker housing
provision; North West Mull Community Woodland Company who are being supported to re-
populate the island of Ulva; Colonsay Community Development Company, and LINK Housing
Association who are exploring the potential for further phases of development at Dunbeg beyond
the 375 units anticipated to be completed by December 2022. The Rockfield Centre was
previously reported as a good example of effective regeneration through partnership working
which has occurred with the assistance of Regeneration Capital Grant Funding and Town Centre
Funding. The Rockfield Centre is now operational providing an increasing programme of events
and activities, providing social support to the community and economic activity within the
previously vacant, town centre building. The Council also supports, and works in partnership with
the area’s Business Improvement Districts.
1.2.11 The Covid-19 pandemic has impacted on a number of consultation projects originally
planned for 2020/21, including postponement of consultation on the Tarbert and Helensburgh
Town Centre Conservation Area Appraisals. The Council however adopted a virtual consultation
approach to progress the public consultation on the Ardrishaig North Public Realm Improvements
in June 2020 to seek input on the final design drawings in advance of an application for planning
permission which was submitted and determined during 2021. It has been a long term aspiration
of local residents and community organisations to see these public spaces integrate better with
activity in the town, including provision of crossing points and space for public events, along with
an uplift to their overall appearance. The Council has been working closely with members of the
Community Council and Community Trust to bring the proposals forward within budget.
1.2.12 The Development Management Service continues to offer a pre-application and
permitted development enquiry service. Previously we have reported on the introduction of
charging, template responses and online submissions to provide timely, consistent, high quality
advice to prospective developers through identification of relevant planning policies, constraints
and requirement for supporting information in advance of the formal application process. The
Planning section of the Council website includes useful customer information including advice on
‘Permitted Development’, relevant publications including the LDP and non-statutory guidance,
information on the planning process and details of how interested parties can engage with it.
13
Planning Performance Framework Report 2021/22

Page 15

Customer feedback has however identified demand for a  pre-app initiation and follow up
advice service however plans to extend the range of services and undertake a full review and
refresh of website content has not been possible during 2021/22 due to additional work
pressures continuing from the Covid-19 pandemic. Throughout 2021/22 details of disruption to
the delivery of services and alternative arrangements for contacting the Planning Service during
the Covid-19 pandemic have been published and kept up to date on the Council’s website.
1.2.13 Elected members are involved  at an early stage of an application for ‘major’
development and are provided with a briefing on all Proposal of Application Notices (PANs). This
protocol requires all PANs to be reported to the PPSL Committee and allows Members the
opportunity to identify matters which they consider would be material to the determination of any
subsequent application. Any issues raised by Members are then fed back to the applicant to take
into account in the preparation of their formal application. Commencement of s23 of the Planning
(Scotland) Act 2019 has also introduced a new requirement to directly notify local, Scottish, and
UK elected representatives when an application for Major development is received. The Council
responded to this additional requirement through the introduction in 2019/20 of a new protocol
providing notification to the relevant parties by e-mail.
1.2.14 We have reported in previous PPFs on the certainty provided through development of
masterplans  and LDP allocations. Recent years have seen development, including affordable
housing, delivered within masterplan/LDP allocations in Bowmore, Campbeltown, Dunoon,
Helensburgh, Lochgilphead, Inveraray, Port Ellen, and Tobermory and we reported in PPF 7,
PPF 8 and PPF 9 that the Dunbeg masterplan area was the subject of a detailed application for
300 affordable dwelling units that is now on site. Case Study 3 provides an update on activity at
Dunbeg over the past 12 months where significant progress has been made toward delivery of
300 affordable houses with completion anticipated during 2022/23. 2020/21 saw the approval of a
new masterplan for a designated Potential Development Area in Scalasaig, Colonsay to support
community led aspirations spearheaded by the Colonsay Community Development Company in
partnership with MOWI for social housing and economic development on the island. Approval of
the masterplan facilitated a grant of planning permission for phase 1 of the development which 
will be onsite during 2022/23. 
1.2.15 Throughout 2020/21 and 2021/22, the Development Management and Projects &
Regeneration officers have participated in cross-service/agency working groups as part of the
Council’s ongoing response to and recovery from the impacts of the Covid-19 pandemic.  
Notably this has included participation in the Town Centre Recovery working group including
Council representatives from Regulatory Services, Roads, and Licencing, and external
stakeholders including Transport Scotland, Police Scotland, and BIDS representatives. Co-
ordination of activity with this group has also informed the Council’s approach to relaxation of
planning controls during the emergency period, a pragmatic approach to planning input in the
consideration of temporary licence applications, and proactive identification of public realm sites
and management of demand for use of these locations.
1.2.16 Progression of pilot projects to deliver two Simplified Planning Zones (SPZs) have not
been taken forward in 2021/22 as previously planned. Further investigation into flooding issues
on the Lochgilphead site has cast doubt over viability of the intended development. The Mull site
has been identified for delivery of housing for key workers and will now be taken forward as part
of the Council’s Rural Growth Deal.
14
Planning Performance Framework Report 2021/22

Page 16

Dunbeg Masterplan -
Update 2022 Case Study 3 
In PPF 8, PPF 9 and PPF 10 we provided an update on the implementation of the Dunbeg
Masterplan, which focussed on the installation of essential infrastructure upgrades, and provided
an overview of cross-service internal and external collaborative working arrangements that had
been put in place to bring the project to fruition.
The project is being delivered through a strategic partnership between Argyll and Bute Council
and LINK Housing Association. The aim of the project was to provide a sympathetic extension to
the existing settlement of Dunbeg and has taken a design-led approach in addressing the
challenges presented by its rural location and coastal, moorland landscape to deliver a
development with placemaking and connectivity firmly established in its foundation. 
To date 154 homes within Phases 3A-3D are completed and have been handed over to West
Highland Housing Association. The delivery of the remaining 146 units are programmed to
handed over in further phases between June 2022 and May 2023. The project has faced
significant challenges with supply chains and workforce availability reflecting post-Covid impacts
15 
Themes A: Quality of
Outcomes
B: Quality of
Services & 
Engagement
C: Governance
D: Culture of
Continuous 
Improvement
Performance 
Markers 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Key Areas of Work Design, Masterplanning, Affordable Housing, Collaborative Working,
Housing Supply, Placemaking
Stakeholders Argyll and Bute Council, Scottish Government, LINK Housing
Project Lead David Moore / Matt Mulderrig
Planning Performance Framework Report 2021/22

Page 17

at national and global levels. The innovative design and layout of the development is now
clearly starting to emerge on the ground and the demand for housing for workers and
students in the locality has been bolstered through further new developments in the
immediate locality including further investment and growth at the adjacent European Marine
Science Park, and ongoing work to expand the offering of the University of the Highlands and
Islands Dunbeg campus.
The Council will continue to work with key
partners in the area to ensure that all
sections of the housing market continue to
meet demand as this is a key aim of the
Council’s Rural Growth Deal.
Beyond this phase the Council is now
working in partnership with LINK to
explore the delivery mechanisms for
further phases of the Dunbeg Masterplan  
Particularly the Halfway House
Roundabout on the A85 trunk road, and
associated commercial area adjacent it,
and following this provision of a further link
road to facilitate another possible 300 houses.  In the first instance the Council has committed
£640k in Lorn Arc TIF funding to progress more detailed Site Investigation and Design Costs for
the Half Way house roundabout. Proposal of Application Notices for Pre-Application Consultation
have been submitted in advance of major planning applications for the further housing,
commercial and infrastructure developments being progressed. Pre-application discussion has
continued on the further submissions during 2021/22 and planning applications for these phases
are expected later in 2022. The Council has reinstigated the Dunbeg Partnership which involves
all key stakeholders and local community representatives to ensure that there is full engagement
and sharing of information and views as the development of the masterplan moves forward. 
16
Planning Performance Framework Report 2021/22

Page 18

Bringing Empty Homes
Back Into Use Case Study 4
17
Themes A: Quality of
Outcomes
B: Quality of
Services & 
Engagement
C: Governance
D: Culture of
Continuous 
Improvement
Performance 
Markers 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Key Areas of Work Collaborative Working, Interdisciplinary Working, Housing Supply,
Regeneration
Stakeholders Argyll and Bute Council, Home Energy Scotland, Property Owner
Project Lead Matt Mulderrig / Kelly Ferns / Fiona Scott
These original workers semi-detached cottage properties in the conversation village of Cullipool
on Isle of Luing are rich in history and the village and have Listed Building status.  Like other
villages in the Slate Islands, Cullipool owes its existence and growth to the quarrying of the slate
on which large parts of the islands are built. Quarrying lasted until 1965, probably the last
commercial slate quarrying to take place anywhere in the Slate Islands.
The property had been registered as empty since 2013 and had been sporadically used as a
second home for the preceding decades. Originally two dwellings, the property was in poor
condition and not fit for habitation.  One side of the building had a roof covering of corrugated
metal sheeting with the other side finished in natural slate.  The internal layout of the building
was not fit for modern living and required to be stripped back to the bare walls in order to allow
comprehensive refurbishment. 
The owner’s grandson was looking acquire a property and unable to afford to buy in the area due
to the high property prices and limited availability of houses on the market. They initially
contacted the Empty Homes Officer of the Council to discuss trying to bring the building back into
use. Through liaison to obtain advice and providing informed choices, this identified that the most
realistic and affordable option for the young person to achieve their goal of being able to remain
in the area would be to take on the ownership of the property and undertake renovation works to
bring it back into use.
Once ownership had been transferred, the biggest challenge for the new owner was how to
reconfigure the property to in a sympathetic manner to suit modern day living, whilst retaining the
character of the property and the village at the same time. An architect was appointed to help the
Planning Performance Framework Report 2021/22
Before Refurbishment After Refurbishment

Page 19

Planning Performance Framework Report 2021/22
18
owner make the best use of the existing floor plan and maximise the space to meet their needs.
Plans were drawn up, an extensive refurbishment programme produced, quotes received and the
process begun. 
The renovation costs were high, this was due to the extent of the works required, cost of
materials, and labour which are inflated due to the Island location.  However, it was determined
that it still demonstrated best value for the owner.  The Council was able to provide support with
a £10k empty home grant; they qualified for a reduced VAT rate; and Home Energy Scotland
provided financial assistance to install a renewable energy heat source.  All of these support
mechanisms made a significant difference to achieving an affordable and viable project. 
Listed Building Consent and Planning Permission were required and granted to conjoin the two
dwellings, reconfigure the external porch/utility extension and for installation of an air source heat
pump. The Building warrant also approved and following renovation works the completion
certificate was issued December 2021.
This has been a fantastic project that has saved the future of a listed building;  provided a young
first time buyer with an energy efficient and sustainable home; and supported the local economy
and community.  The property owner and occupier said: 
"In rural communities every house is an asset and should be lived in. I have been fortunate to
renovate an empty property into my full-time home in Cullipool on the Isle of Luing. Like many
rural areas, Luing faces an aging population and a big reason for this is a lack of appropriate
housing for younger people and families. The process to bring an old house back to a habitable
state was fairly daunting. I faced many obstacles and challenges throughout the process
including finding a builder willing to take on the work. The house being situated in a Conservation
Area added to the complexity of the project. The property required a total rebuild including a new
roof. I did all the preparation work myself, stripping the house back and removing the old roof
leaving only the 4 original walls. This helped to keep costs down before builders and joiners
came to start the main renovation work. By renovating this house, I have managed to live in the
community where I grew up; something which would have been very challenging if I didn’t
renovate the property. Not only that but I have achieved a far bigger, better-quality home than I
would have been able to afford on the local market. Although a lot more work, it is a very
satisfying process to take an empty property and make it into a full-time home once again."

Page 20

1.3 GOVERNANCE
1.3.1  Development Management and Development Policy items are reported to the
centralised Planning, Protective Services and Licensing (PPSL) Committee which meets monthly
(except for July) and convenes for site visits and discretionary Local Hearings as required. The
PPSL Committee met on 14 occasions during 2021/22. Local Review Bodies operate flexibly to
demand with 19 LRB meetings convened during 2021/22. PPSL continued to operate in a virtual
format during 2021/22 and continued to facilitate public access to meetings; the successful
transition to a virtual format for PPSL meetings has also facilitated 4 applications requiring
discretionary pre-determination hearings to be concluded. The Council has embraced the use of
virtual meetings for committees and discretionary hearings, and whilst some concerns have been
raised about the prospect of digital exclusion, experience to date would indicate that conducting
Committee business online provides additional opportunities for participation, particularly for
populations located in remoter mainland, and island locations. The Full Council decided in
2021/22 to augment this position with improved functionality, scope for hybrid meeting formats,
and functionality for live streaming/broadcasting of Council meetings through recent approval of a
roll out of MS Teams to replace Skype from August 2021. 
1.3.2  The Council’s Scheme of Delegation to officers was reviewed by Full Council and
updated in September 2021. The scheme of delegation continues to operate effectively with
97.7% of decisions being made under delegated powers in 2020/21. During this period 98.0% of
applications were approved demonstrating the effectiveness of a plan-led system, flexible/pro-
development policies which are aligned to the corporate priority of sustainable economic growth,
and a commitment to delivering positive outcomes.
1.3.3  Argyll and Bute Council’s Planning Service continues to face significant budget
pressures due to the requirement for delivery of savings across all Council services. The last few
years have seen a downsizing of staff resource, redesign of service delivery arrangements, and
introduction of a chargeable pre-application enquiry service within the Development Management
Service that have cumulatively delivered budget savings of £405,000. The Development Policy
team have also downsized their staff resource following retirements of experienced officers
during 2019/20 and a requirement to deliver £46,000 savings in 2020/21. The Development
Management Service was also under extraordinary financial pressure arising from the impacts of
the Covid-19 pandemic due to a significant downturn in planning application fee receipts
continuing during 2021/22. The financial outcome was however a significant improvement on
2020/21 although planning fees still only amounted to 82% of pre-Covid income forecasts. The
Council was however pleased to hear the Scottish Government’s during late 2021/22 that a
delayed reform of planning fees would be implemented from 1st April 2022 and is expected to go
some way to addressing the concerns previously raised by the Council in its input to the Costing
the Planning Service in Scotland project (as reported in PPF 8) which highlighted that fees
associated with householder and local applications are insufficient to deliver a cost neutral
position without an unsustainable reliance on a small number of high value major applications to
subsidise the delivery of the Council’s Development Management function. Budgets and
efficiency measures are considered at management meetings at all levels with updates provided
regularly to the Executive Director and elected Policy Lead. Participation in the Costing the
Planning Service in Scotland project, as detailed in PPF 8, has confirmed that the cost efficiency
of Argyll and Bute’s Planning Service compares favourably with that of other Local Authorities
and has provided additional insight to assist with budget planning for future years. The outcomes
of this project were reported to the Council’s PPSL Committee in June 2019.
Planning Performance Framework Report 2021/22
19

Page 21

1.3.4  Planning Enforcement is currently delivered by two dedicated Enforcement
Officers based in Lochgilphead and Oban covering the West of Argyll and Bute with the
undertaking of enforcement duties now being combined with Development Management
casework in the East of the Council area. Enforcement is delivered on a priority basis which is set
out in the Enforcement and Monitoring Charter which was  reviewed, updated and approved in
March 2022. The Council also published an addendum to the Charter in November 2020  which
remains in force until 30th September 2022 clarifying the manner in which unauthorised
development arising from a necessary response / unavoidable impacts of the Covid-19 pandemic
will be addressed in the planning enforcement process. The temporary relaxation of planning
enforcement in relation to town centre recovery from Covid-19 was adopted as a Position
Statement in July 2020 under emergency powers, these provisions have subsequently been
extended up until 30th September 2022 following involvement of elected members.
1.3.5  The Planning Service continue to engage with key partners to facilitate a number of
significant strategic development investments in and around Oban. These include Dunbeg,
SAMS and the European Marine Science Park, Saulmore Golf and Marina Development, and
Oban Airport Business Park. However there is a need to prioritise co-ordination and planning of
long term strategic growth in the Ona area through development and production of the Oban
Strategic Development Framework. This will be prioritised and progressed as and when
resources are available.
1.3.6  Changes to the Council’s corporate structure in 2019 included the functions provided
by Planning and Regulatory Services, and the Economic Development Service being brought
under a single Head of Service which is now titled Development & Economic Growth. Whilst the
corporate restructure was primarily intended to deliver budget savings the new service structure
provides closer alignment and co-ordination of the Council’s regulatory functions, including
Development Management, with the Council’s plan making, business support, and project
delivery activities. Increasing reliance on virtual working has had the benefit of providing
improved opportunities for collaboration and partnership working across Council services with
virtual project teams capable of being readily assembled without the need for extensive travel
and time demands. Examples of this approach include Rural Growth Deal Working Groups, the
Council’s Climate Change Board, and the Care Homes and Housing Programme Board which
bring together stakeholders from across a number of Council Services and other key external
agencies.
1.3.7  The Planning Service continues to engage with other Council Services through Area
Property Action Groups (APAGs). This award winning approach and some of its successful, high
quality outcomes have been highlighted within previous PPFs, and examples of this innovative,
inter-disciplinary approach to problem solving have been highlighted in PPF 8.
1.3.8  The Council continues to explore the delivery of shared services with other authorities.
During 2021/22 the Planning Service has re-instigated shared service delivery of Conservation
and Design advice to Loch Lomond and the Trossachs National Park Authority, and has
delivered a small amount of charged Biodiversity consultancy.  Collaboration with neighbouring
authorities also remains ongoing and during 2021/22 this has included case officer discussion
with the LLTNP on the administration of cross-boundary applications.
1.3.9  The Development Management Service continues to seek to review and refine existing
processes to deliver efficiency savings and improve performance and outcomes for customers.
During 2018/19 the Development Management Service invested and delivered an upgrade of
Planning Performance Framework Report 2021/22
20

Page 22

Public Access improving stability of this customer engagement tool and allowing greater
scope to improve the customer experience. The Service also invested in the purchase of
IDOX Enterprise for Uniform during 2018/19 and undertook initial development work during
2019/20 however the development and roll out of Enterprise, which will implement improved
workflow processes and performance management, was postponed during 2020/21 due resource
implications arising from the Covid-19 pandemic. During 2021/22 a project has been
implemented to replace the existing Document Management System (DMS) to deliver improved
functionality for both officers, stakeholders and the public; Planning and Regulatory Services
have engaged with the Council’s ICT Service to implement a project managed approach to
development, implementation and roll out across three Council Services which is programmed for
completion in 2022/23. Initial implementation of Enterprise is now scheduled alongside
completion of the DMS project during 2022/23. As previously reported in PPF 10, the Covid-19
pandemic has enforced a requirement to adapt to restrictions on travel and social distancing and
has expedited the adoption of online working practices, including online validation and e-decision
notices, which will be retained in the long term. 
1.3.10 All professional staff within Planning Services are provided with laptops to facilitate
their ability to travel efficiently and work flexibly across the Council area. The Development
Management Service has invested in tablets which were deployed during 2020/21 to allow use of
e-documents as a replacement for hard copy planning application documentation used for
examination of plans outwith the office environment, and recording site visit activity. The
Council’s longer term investment in ICT that supports flexible working arrangements was crucial
to our reaction to the Covid-19 pandemic and allowed the majority of Planning Services staff to
seamlessly move to home working. Services providing frontline contact services now largely
continue to continue to provide a primarily virtual service although face to face engagement has
resumed where required. In some instances this has involved the delivery of new solutions such
as the utilisation of Health Service Near Me portal by the Council’s Housing Service to deliver
virtual face to face interviews with clients, and the further dissemination of smart phones.
1.3.11 Customer appetite for Processing Agreements remains indifferent. The Development
Management Service did not determine any applications with a Processing Agreement during
2021/22 despite engaging with all applicants for Major development. Information on the
availability of Processing Agreements is available on the Council’s website, is highlighted in all
pre-application reports, and has previously been promoted in User Forums. 
1.3.12 Argyll and Bute Council has a corporate complaints process; customer information is
provided on the Council website and in customer Charters. All complaints are subject to
performance reporting and ‘Stage 2’ complaints require review by senior management with the
option to seek further review by the Scottish Public Services Ombudsman (SPSO) where
customers are not satisfied with the outcome.
1.3.13 Legacy cases (applications which have been valid for more than 12 months) are
reviewed regularly as part of caseload management however the resource required to undertake
this has been reduced due to reduced staffing capacity. Ordinarily, caseload reviews on
longstanding applications is undertaken weekly/biweekly at team level and monthly with
involvement of a senior manager. During 2020/21, 27 legacy applications were concluded
representing an improvement on the previous period. Unfortunately the continuing impact of the
Covid-19 pandemic upon workflows/staff absence and difficulty in recruiting to vacant posts has
reduced the capacity of the Development Management Service to determining planning
Planning Performance Framework Report 2021/22
21

Page 23

applications has resulted in 35 new legacy cases (64 legacy cases in total) remaining
undetermined as of 31st March 2022. Ordinarily legacy cases are subject to regular review by
the DM Management team and targeted for conclusion; however during 2021/22 a long term
vacancy at Team Leader level and the impact that this has had on the wider DM Management
team has precluded this activity, it is however intended to reintroduce this activity once resources
allow.
1.3.14 Applications which are to be subject to planning legal agreements are flagged up on
lists of undetermined applications to ensure that the progress can be reviewed on a regular basis,
it is noted that a requirement to operate with long-term vacancies has reduced resources and
availability of staff to undertake this activity. The average  time period for processing applications
with legal agreements increased from 15.5 weeks to 33.6 weeks during 2021/22.
Planning Performance Framework Report 2021/22
22
Development
Management Response
to Covid-19 - Update
Case Study 5
Themes A: Quality of
Outcomes
B: Quality of
Services & 
Engagement
C: Governance
D: Culture of
Continuous 
Improvement
Performance 
Markers 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Key Areas of Work Development Management Processes, Performance Management, Process
Improvement, Staff Training, Online Systems, Interdisciplinary Working
Stakeholders ABC Development Management, IT, Legal and Governance
Project Lead Peter Bain
In PPF 10 Case Study 6 we provided an overview of the impacts of the Covid-19 pandemic upon
the delivery of Development Management. Whilst many of the most serious impacts and re-
strictions associated with the pandemic have now receded they did continue to have a significant
direct and indirect effects during 2021/22 on the manner in which the Council delivered Develop-
ment Management, including the availability and deployment of staff resources, the management
of workflow, and the manner in which we engaged customers. This Case Study seeks to provide
a summary of those ongoing impacts and arrangements.
Continuity of Critical Business:
Processes and procedures implemented to recover critical business during April/May 2020 which
saw the closure of Council offices, the implementation of home working, a move to paperless sys-
tems, and the use of online meetings as an alternative to face to face engagement continued
throughout 2021/22. Whilst the circumstances of the pandemic and Scottish Government guid-
ance that necessitated the evolution of working arrangements have since been rescinded the
Council has identified that future working arrangements will involve be a hybrid mixing a require-
ment of office and virtual attendance and has accordingly embarked on a programme to rational-
ise its office estate and seek to provide working arrangements which meet future requirements. In

Page 24

Planning Performance Framework Report 2021/22
the short-term this has resulted in the continued closure of Council offices across Argyll and
Bute with limited re-opening to the public and staff being encouraged to remain home working
where possible.
Longer Term Impacts:
Workflow: We reported last year that during 2020/21 the pandemic had a significant impact upon
the timing of new submissions throughout the year, and that travel restrictions precluded our abil-
ity to determine a number of applications that were already in the system.  April and May 2021
saw a continuation of the rebound effect experienced at the end of the previous financial year
with excess demand overwhelming the capacity of the Central Validation Team to register and
review the competency of applications. This position was also exacerbated by an apparent re-
duction in the quality/competency of submissions as developers sought to progress delayed de-
velopments. The time taken to review new submissions increased from 5 working days at the
end of 2020/21 to around 20 working days in early 2021/22 and despite hiring an additional staff
member and authorising overtime to increase the capacity this has only been sufficient to main-
tain that level of performance in light of increased absence (both Covid and non-Covid), a
phased retirement, a continuing high volume of substandard submissions which require to be re-
viewed multiple times, and increased demand for customer contact. Delays at validation stage
have also had a knock on effect on the overall time period to determine applications. The availa-
bility of a professional resource to assess and determine applications has also been significantly
impacted during 2021/22, in part by an increase in Covid and stress related absence within the
wider team over this period, and also as a result of the loss of number of experienced staff mem-
bers and difficulties in recruiting replacements which has seen the team operate at only 75-80%
staffing levels for extended periods of time.
Workflow pressures in the management of statutory activities has largely been addressed by
downgrading the priority of non-statutory activities and in seeking to ensure that available re-
sources are targeted toward the validation and determination of priority cases where the project
will deliver significant employment or affordable housing, and where there are either fixed dead-
lines, funding cut-offs, or health issues that would be impacted by a delay to determination. This
has included reducing/removing resource allocated to service improvement activities, longer time
periods for responding to pre-application enquiries and has also impacted upon our ability to de-
liver on planning enforcement. This latter element, coupled with enforcement relaxations in town
centres, continues to give rise to an ‘enforcement deficit’ that will not only require additional re-
source in the future to address but is evident in increasing customer dissatisfaction where the
Council’s enforcement response does not meet ‘normal’ expectations; a similar rise in complaints
relating to the time taken to determine planning applications is also becoming evident.
Customer Communication: The Development Management Service continues to provide ‘live’
service updates online, newsletter/e-mail updates to regular customers, and e-mail updates to
individual applicants. The Senior Management Team are kept updated on issues affecting ser-
vice delivery arrangements and have in turn been supportive where customers have been un-
happy to be advised that ‘normal’ expectations on service delivery cannot be met. It is however
acknowledged that during 2021/22 there has been an increase in customer dissatisfaction due to
more frequent breakdowns in communication at case officer level which has proven difficult to
address due to the significant caseload pressures that officers are working under, the changing
mood and reducing acceptance of customers in a post-pandemic situation, and continuing diffi-
23

Page 25

Planning Performance Framework Report 2021/22
culties with recruitment which required the Service to operate without a full quota of profes-
sional staff over extended time periods.
Finances: 2021/22 saw an improving financial position however whilst submission rates re-
turned to and exceeded pre-pandemic levels there was still a general lack of larger scale, high
fee value projects entering the system during this period and the end result was the fee receipts
were still 19% under recovered for this period (which was offset by Covid funding) but nonethe-
less restricted the ability of the Service to respond to workflow issues and precluded any longer-
term commitment to increase staff resource in response to the emerging trend of increasing case
work volumes.
Home working: The Council’s previous investment in technology that supported flexible working
arrangements, and the resilience of its ICT infrastructure was fundamental to the success of the
Development Management Service in being able to resume activity in an almost seamless man-
ner. The enforced requirement for home working demonstrated that this is a viable option for staff
and managers to consider as part of future service delivery arrangements with benefits of in-
creased flexibility for staff, and greater potential to attract suitably qualified professional staff, par-
ticularly for work in more remote areas. There are also potential financial benefits for the Council
if it is able to rationalise its office estate. The Development Management Service has engaged in
corporate workstreams that are not simply looking to manage the return to office working but will
seek to modernise the Council’s working arrangements on a more permanent basis with options
for office / hybrid / home working arrangements. Extended periods of home working has contin-
ued to have a number of adverse consequences during 2021/22 particularly with the manage-
ment of communications and staff morale. Arrangements have been made to allow staff who had
become isolated at home access to the office however efforts to revive physical and social inter-
action of staff have also seen incidents of subsequent Covid absence which suggests caution still
requires to be exercised in encouraging staff to meet face to face. Home working still gives rise
to difficulties in managing, training and motivating individuals and their performance. The Devel-
opment Management Service has utilised MS Teams to create new channels for communication
and sharing of information particularly for training and reference purposes, and  has continuing to
work on the development of a new workflow system which when introduced in 2022/23 will pro-
vide individuals and managers with better tools to effectively and efficiently organise and manage
their workload and review performance both at team and individual level. 
Performance: Difficulties in recruitment, increased staff absence, significant delays at validation
interruption of workflow, and reduced efficiency of some ad-hoc electronic processes continues
to significantly impact upon the ability of the Development Management Service to determine ap-
plications efficiently. The average time taken for determination of local (non-householder) sub-
missions had increased by just over 1 week since 2021/22 and the volume of undetermined ap-
plications which is evident in an increase in ‘legacy’ applications is continuing to place the Devel-
opment Management Service under considerable strain going into 2022/23 and will only be re-
solved once the Service is able to return to full staffing levels following recruitment to current va-
cancies. The Scottish Government’s announcement in March 2022 that planning fees would be
increased for 2022/23 has been welcomed by the Council; however the lack of notice has pre-
cluded any expectation of additional income to be factored into the budget planning process and
will resultantly cause some delay in being able to secure elected member commitment on how
much of this can be reinvested back into the Development Management Service particularly giv-
en that there is evidence to suggest that a significant increase in ‘major’ applications and com-
plex S36/S37 consultation case work will be received in the upcoming period.
24

Page 26

1.4 CULTURE OF CONTINUOUS IMPROVEMENT
1.4.1  During 2021/22 the Planning Service delivered and progressed on a range of
Improvement Actions identified in PPF 10. An overview of progress is set out in Part 3 of this
document.
1.4.2  The Council continues to benchmark its performance on the determination of planning
applications against the National average and the performance of other rural local authorities. 
1.4.3  Internally, team meetings are held on a regular basis. The Executive Director attends
fortnightly Strategic Management Team meetings. The Head of Development & Economic
Growth attends the fortnightly Departmental Management Team meeting and monthly meetings
of the Strategic Management Team, provides a regular update to Policy Leads, and holds his
own Service meetings on a regular basis; a Service level e-Development group is also convened
quarterly. Service level management teams also meet regularly/quarterly; within Development
Management area teams also meet weekly to assign casework, and review caseload
performance.
1.4.4  In January 2022 the Council replaced a corporate requirement for all staff to prepare
an annual Performance Review and Development plan (PRD). The new approach seeks to
recognise that an annual PRD meeting was not always the best way to approach performance
and career conversations and instead now recognises that conversations about objectives,
behaviours, skills and development form part of an ongoing regular dialogue between employees
and line managers although this will be supported by corporate activity monitoring outcomes in
an annual survey of employers and managers.
1.4.5  Since 2014, the Planning Service has delivered a series of short training events for
elected Members which are intended to improve their breadth of knowledge and competence in
the  undertaking of planning decisions. These are normally undertaken in bite size sessions in the
hour prior to a meeting of the PPSL Committee but have also previously included half day
workshops and site visits. Training during 2019/20 included Competent Motions, Aquaculture
Development, Oban Strategic Development Framework, Landscape Character Assessment, Low
Carbon Technology, Food Growing Strategy, and an update on the Planning (Scotland) Act 2019.
Training sessions have recommenced in April 2021 and the training programme for 2021/22
included information on the impact of Covid-19 on the delivery of planning services, a
presentation from the Planning & Environmental Appeals Division (DPEA), planning enforcement,
a presentation from SEPA on their role as a statutory consultee, placemaking, archaeology and
planning, material considerations, access issues, energy efficiency and the historic environment,
and landscape and visual impact assessment. The Planning Service have also delivered in
house training in May/June 2022 to provide members of the PPSL Committee with an overview of
the planning system and processes in which they are required to participate.
1.4.6  The Annual Planning Conference was held in March 2022 both at Helensburgh Civic
Centre and online as a hybrid event.  This was an important opportunity for many members of
staff to meet face to face for the first time since the pandemic began. Not only that, but it was
also a first chance to deliver a fully hybrid conference where both attendees and presenters
utilised a mix of in person and virtual attendance. This allowed the opportunity to explore the
technical capabilities of hardware/software and the challenges of delivering this type of event and
will be a crucial learning event in the development of strategies for future public engagements. 
The conference was open to professional staff across the Council who engage in or with the
planning process; the conference is promoted as a CPD event to staff in addition to an
opportunity to recognise and promote collaborative working not only across the Council but also
25

Page 27

with other key stakeholders. The March 2022 event included presentations from SEPA and a
private sector outlook on the housing market from Taylor Wimpey. Previous conferences
have included presentations from the external partners including Nature.Scot, Historic
Environment Scotland, and SEPA. Presentations have also been received from the Council’s
Housing, Economic Growth, and Roads Services, in addition to the Local Biodiversity Officer,
Marine and Coastal Development Officer, and GIS Manager covering a range of topics including
delivery of affordable housing, homelessness, SuDS, flooding and coastal erosion, Appropriate
Assessments, Construction Environmental Management Plans, the Clyde Regional Marine Plan,
and availability of new GIS services. The annual conference is a successful platform for
exchanging ideas, working practices and knowledge between different Council Services and key
stakeholders, and for fostering smarter, more efficient ways of working.
1.4.7  Planning Services representatives regularly attend meetings of Heads of Planning
Scotland (inc. DM and DP subgroups), Scottish Planning Enforcement Forum, the Local Authority
Aquaculture Forum, Clyde Marine Planning Partnership, West of Scotland Archaeology Service,
and the e-Development/Digital Taskforce and have continued to do so during the Covid-19
pandemic as the majority of these moved to virtual forums. During 2021/22 the Development
Management Service has continued to have quarterly meetings with Highland’s and Islands
Enterprise, Scottish and Southern Electricity Networks, and Forestry Scotland to discuss
upcoming projects, and to identify and prioritise resource for submission and determination of
applications. Whilst it is recognised that there is a downside to the removal of face to face contact
there is a significant time and cost saving for authorities like Argyll and Bute through removal/
reduction in the significant travel requirements. 
1.4.8  In addition to benchmarking performance, the Planning Service also seeks to engage
directly with other local authorities to share best practice and develop new ways of working.
During 2019/20 officers visited Dumfries and Galloway Council, and Glasgow City Council to
learn from their experience in the development and roll out of bespoke IDOX Enterprise workflow
systems; and more recently have engaged more widely with other rural local authorities on
reviewing and updating procedures for handling Prior Notification/Prior Approval submissions,
have provided advice to North Ayrshire Council and Loch Lomond and the Trossachs National
Park to assist with their handling of aquaculture submissions/cross boundary applications.
1.4.9  Work to review and improve the rate of applications which are valid upon receipt is
currently on hold due a lack of staff resource to progress this workstream. Officers have however
continued to participate in a review of the Scottish National Validation Standards that is being
undertaken by the Heads of Planning Scotland. The Development Management Service
previously hosted a visit from Loch Lomond and the Trossachs National Park Authority in
2019/20 to compare arrangements, experience, and resources for the validation of planning
applications. During 2020/21, the closure of Council offices required the rapid development and
implementation of new process to facilitate home working in the validation process; limited office
presence has however been maintained to manage incoming/outgoing hardcopy mail (including
issue of neighbour notifications), and for the conversion of hardcopy submissions into electronic
workflow upon receipt. The increase in substandard submissions appears to be a continuing
trend and the percentage of applications valid upon receipt has declined further to 18%.
Abnormal workflows, particularly the glut of submissions in FQ4 2020/21 generated a backlog of
case work which continues to impact significantly upon the capacity of the centralised validation
service to meet performance targets of a 5 day turnaround for reviewing submissions and
validation checks are currently taking significantly longer to complete despite the provision of
26
Planning Performance Framework Report 2021/22

Page 28

additional staff resource and use of overtime.
1.4.10 The Planning Service have engaged with Scottish Government consultations, in
particular during 2021/22 to the consultations on Local Place Plan Regulations, Short Term
Lets, Onshore Wind Policy Statement,  Local Development Planning Regulations and Guidance,
Open Space Strategies, Draft Heat Networks Delivery Plan, Marine Litter Strategy, A New Deal
for Tenants and NPF4. We have also engaged with the Independent review of the Current
Regulatory Framework for Aquaculture  with consultations by other National agencies including
SEPA’s Proposals for a Risk-Based Framework for Managing Interaction Between Sea-Lice and
Wild Atlantic Salmon, and with the Improvement Service on 20 Minute Neighbourhoods in Rural
and Island Areas.
1.4.11 In March 2020 the Planning, Protective Services and Licencing Committee approved
the Lochgilphead Conservation Area Appraisal and Management Plan as non-statutory technical
planning guidance. We also reported in PPF 9 that draft Appraisals and Management Plans for
the Tarbert, and Helensburgh Town Centre Conservation Areas had been prepared for
progression in 2020/21. Public engagement on these items has been postponed in light of
restrictions arising from Covid-19 and a reduced staff resource due to maternity leave during the
reporting period but will be reviewed when resources become available.
1.4.12 Aquaculture is an area of planning that relatively few authorities have expertise in.
Argyll and Bute is one of five Scottish Local Authorities that deal with the majority of fin fish
planning applications. The aquaculture industry is currently seeking to expand into new locations
across Scotland to meet national growth targets. In PPF 8 we reported that we had provided
assistance to colleagues in North Ayrshire Council and Loch Lomond and the Trossachs National
Park following receipt of EIA Screening and Scoping requests for aquaculture development within
their respective areas and informal support has continued to be provided during 2021/22 as these
projects progressed to formal applications. In 2020/21 Argyll and Bute took up the role of Chair
within Local Authority Aquaculture-working group, an online event was held last year however a
resumption of the group as a physical meeting with site visit learning opportunities is scheduled
for September 2022. Officers also continue to participate in the Fish Welfare Multiagency group
which is hosted by the Department for Environment Food & Rural Affairs (DEFRA) and includes
Marine Scotland, SEPA, and Local Authority representatives from both a planning and animal
welfare perspective. 
1.4.13 We reported in PPF 8 and PPF 9 of investment in updated software/systems to deliver
a more resilient Public Access service resulting in the availability of the Public Access system
rising to 99.9% for the second half of 2018/19. Whilst issues with the day to day resilience of this
service have been addressed there is now a focus on delivering improvements to the usability of
the Public Access System. It has been identified that delivery of the desired improvements are
very much dependent on providing improved compatibility with back office Document
Management Systems (DMS) and accordingly work has been progressed with IT, Building
Standards and Regulatory Services a project has been planned and initiated during 2021/22 to
move to the IDOX DMS that will enable improvements to Public Access but also to the
functionality of other existing back office workflow systems across a range of Council services.
The project is due for completion in 2022/23.
1.4.14 Internal processes for handling pre-applications and the management of e-mail
correspondence and file attachments were subject to review and updating throughout 2019/20
having regard to the implications of GDPR with updated data retention policies, procedure notes
27
Planning Performance Framework Report 2021/22

Page 29

for staff and training sessions delivered, and deletion of data/documents that no longer
required be held from systems was undertaken during 2020/21. Enforced homeworking
arrangements implemented in response to Covid-19 restrictions have resulted in new
workflow processes that remove/minimise the requirement for hardcopy process in mail handling,
issuing of decision being expedited in their development in order to allow the planning process to
continue operating during ’lockdown’, a lack of staff resource has however to date precluded the
further development of a number of temporary processes put in place.
1.4.15 We reported in PPF 8 that the Planning Service has successfully attained Customer
Service Excellence Standard during 2018/19. Retention of CSE accreditation requires continued
engagement with customers to develop and inform the ways in which we deliver our services in
the future and the standards to which we deliver them. The reaccreditation assessment was held
in March 2021 as a virtual event and re-accreditation was confirmed in early April 2021 The
assessment included a specific focus on how Planning and Regulatory Services had reacted to
the Covid-19 pandemic and maintained customer service levels despite the limitations imposed
by home working, contact and travel restrictions during this period. 
1.4.16 The online and mobile capabilities of the Council’s Geographic Information Systems
(GIS) continue to be developed saving officer time and providing customers with quicker access
to information. In PPF 9 we reported that the GIS team developed the ‘story map’ for the
proposed LDP 2 public consultation, and enhanced the photographic data layer in the online map
based footpath guide to include key view points from an increasing number of paths. The GIS
team also played a valuable role in the Council’s response planning to the Covid-19 pandemic
and have assisted with a great many of the planning and logistical challenges that have arisen.
During 2021/22 the team have continued work to enhance the Strategic Housing Investment Plan
(SHIP) with enhanced GIS functionality which is now being used to facilitate easier and earlier
identification of impediments to development within the SHIP programme. The GIS team has
developed a GIS based Storymap which allows spatial analysis of all RSL stock, new builds,
ongoing and future development sites.  This is an invaluable input to updating and planning the
annual SHIP.  As this is further developed it will also be launched online.  Going forwards the
service is seeking to replicate this for all housing tenures in order to further inform our
understanding and analysis of the housing market within Argyll and Bute.
1.4.17 Engagement with Forestry Scotland was initiated during 2020/21 on a review of the
effectiveness of consultation with the Council on proposals for new plantations, forest accesses,
and long term forest plans. This workstream has however been put on hold during 2021/22 due
to a lack of resources. Once completed it is expected to deliver a streamlined consultation
process with improved quality of consultation response that is tailored to meet the requirements
of Forestry Scotland officers in their assessment of planning proposals. The publication of
technical note on Upland Hill Tracks has been progressed and was intended to be completed for
publication concurrently with completion of this workstream but has been placed on hold
indefinitely following announcement by the Scottish Government in November 2019 that related
’permitted development rights’ would be subject to an upcoming review. 
1.4.18 The Planning Service has engaged with consultation on both planning controls and
licencing for short-term letting, and form part of the Council’s working group involving Legal,
Regulatory Services, Housing and external stakeholders which will initially seek to implement a
licencing scheme from 1st October 2022 and then consider the requirement for planning control
areas in the medium to longer-term. In the short term it has been identified that, in the absence of
national guidance, local advice requires to be provided by the Council for both officers and the
public on planning requirements for short-term lets outwith control areas.
28

Page 30

CCDC Masterplan for
Scalasaig Case Study 6
29
Themes A: Quality of
Outcomes
B: Quality of
Services & 
Engagement
C: Governance
D: Culture of
Continuous 
Improvement
Performance 
Markers 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Key Areas of Work Interdisciplinary Working, Collaborative Working, Masterplanning,
Housing Supply, Affordable Housing
Stakeholders Argyll and Bute Council, Colonsay Community Development Company,
Communities Housing Trust, Scottish Land Fund, HIE, MOWI
Project Lead David Love / Peter Bain
Colonsay Community Development Company (CCDC) has identified that a significant proportion
of the housing stock on the Island is utilised as second homes or for self-catering holiday
accommodation and as a consequence young people and families who wish to stay or relocate
to Colonsay are priced out of the local property market. Like many other rural and island
communities, the resident population of Colonsay has decreased significantly with a consequent
impact on the availability of working age residents and young people threatening the
sustainability of life line services and community facilities. It is nearly twenty years since the last
affordable housing development on Colonsay, however CCDC has been working efforts to
deliver affordable homes to both retain existing islanders and to attract new residents.
The establishment of a new marine fish farm off of the north-east coast of Colonsay by MOWI 
further highlighted the lack of availability of accommodation on the island to support employment
and inward investment. A fish farm creates jobs for local people living on the island and can also
attract new people or enable people to return; however a fish farm is not viable without housing
for its employees.
Argyll and Bute Council had recognised the demand to deliver new housing on Colonsay through
the identification a Potential Development Area (PDA 8/1), originally in the 2009 LDP, and
retained this in the Argyll and Bute Local Development Plan 2015. The PDA is intended to deliver
low to medium density housing including provision of an affordable housing component of at
least 25% of the overall development. Whilst the identified site offered the prospect of
consolidating new housing around existing infrastructure within the settlement of Scalasaig the
LDP also highlighted a number of constraints relating to the historic and natural environment, and
sewage infrastructure that would require to be addressed and promoted a masterplanned
approach as a means of delivering development of the site. Guidance on the masterplan process
has been published as a Technical Note.

Page 31

Planning Performance Framework Report 2021/22
In April 2020, CCDC secured community ownership of two sites in Scalasaig with funding
from the Scottish Land Fund, Highlands & Islands Enterprise, Argyll and Bute Council, and
MOWI. One site relates to the PDA and is intended to deliver affordable housing within a
development of up to 24 units. The second site will be used to develop new commercial units and
workshop space. 
Early engagement between CCDC and
the Development Management and
Development Policy teams facilitated the
submission of both a masterplan for the
PDA and a planning application for the
first phase of the development by
January 2021. The submissions were
assessed concurrently and positively
determined at the April meeting of the
Council’s Planning Protective Services
and Licencing (PPSL) Committee. The
Masterplanning process provided a
means of addressing biodiversity issues
relating to Corncrake habitat and
ensuring protection for the setting of two
category B listed buildings within the wider proposals for development as well as ensuring that
infrastructure proposals for the site were appropriate to deliver longer-term aspirations for
development, and as a means of providing a degree of flexibility to the boundaries of the site as
originally defined in the LDP to be adapted as further information on ground conditions and their
suitability for development was provided.
The first phase of the development will deliver 12 residential units, 6 will be retained by CCDC to
provide affordable housing to address the requirements of both resident and incoming
population, 3 units will be offered as self-build plots, and the remaining 3 units have been
consented as Houses in Multiple Occupation which will be leased to MOWI to provide
accommodation for their employees on the island. In the event that MOWI’s requirement for
accommodation decreases then these properties would revert to CCDC and be made available
to address housing need at that time. The first phase of the development is onsite during
2022/23 and the quick turnaround demonstrates the benefits of a Masterplanning as tool to refine
LDP aspirations in addition to the effectiveness of early engagement and the ability of the
Planning Service to prioritise resources to support rural communities.
30

Page 32

Supporting Evidence &
Performance Markers Part 2:
Wherever possible weblinks have been provided
within the body text of the report.
This report was compiled drawing on evidence from
a variety of sources including:
 Argyll and Bute Outcome Improvement Plan 2013-
2023 
 Argyll and Bute - Economic Development Action
Plan 2016 - 2021
 Argyll and Bute—Renewable Energy Action Plan
 Argyll and Bute Local Development Plan 2015 
 Argyll and Bute Local Development Plan 2
Development Plan Scheme March 2022
 Argyll and Bute - Main Issues Report 2017 
 Argyll and Bute Council Website
 Argyll and Bute Council Monitoring and Enforce-
ment Charter March 2022 & Covid-19 Addendum
 Argyll and Bute Council Planning Performance
Framework Online Publication/Archive
 Argyll and Bute Council, PPSL Committee Minutes
 Argyll and Bute Council Scheme of Administration
and Delegation 
 Argyll and Bute Council, Development & Economic
Growth Service Plan 2020-23
 Argyll and Bute Housing Land Audit 2021 
 A range of committee reports
 Customer feedback
 Reports from IDOX Uniform
 Scottish Government Statistical Returns 
31
Case Study Topics
Issue
cov-
ered by
Case
Study
No.
Case Study Topics
Issue
cov-
ered by
Case
Study
No.
Case Study Topics
Issue
cov-
ered by
Case
Study
No.
Design 3 Economic Develop-
ment 
Performance Monitoring 5
Conservation 1 Enforcement 5 Process Improvement 5
Regeneration 1 Development Manage-
ment Processes
5 Project Management 
Environment 2 Planning Applications 2, 5 Skills Sharing 
Greenspace  Interdisciplinary Work-
ing
1, 2, 4 Staff Training 5
Town Centres 1 Collaborative Working 1, 2, 3, 4,
6
Online Systems 5
Masterplanning 3 Community Engage-
ment
1 Transport 
LDP & Supplementary
Guidance
6 Placemaking 3 Active Travel 
Housing Supply 3, 6 Charrettes  Other:  
Affordable Housing 3, 6 Place Standard   
Planning Performance Framework Report 2021/22

Page 33

32
PERFORMANCE MARKERS REPORT 202/21 
PERFORMANCE MARKER EVIDENCE / COMMENTS
1. Decision-making: Authorities
demonstrating continuous evidence of
reducing average timescales for all
development types.
Part 4—Table B & Part 5—Table A.
Contextual commentary setting out factors affecting  performance on
decision-making are set out under Part 5 C and also within Case
Study 5.
2. Project management: Offer of
processing agreements (or other
agreed project plan) made to
prospective applicants in all major
applications and availability publicised
on planning authority website.
Part 1—1.3.11
Processing Agreements for major and ‘locally significant’
developments are promoted through pre-application discussion, user
forums and online. 
Argyll and Bute Council - Processing Agreements 
3. Early Collaboration with applicants
and consultees on planning
applications:
 Availability and promotion of pre-
application discussion for all
prospective applications.
 Clear and proportionate
requests for supporting
information.
Part 1—1.2.12 Case Studies 2, 3, 4 & 6, & Part 4 - Table B
The Development Management Service provides a pre-application
advice service. This is promoted on the Council website, through
user forums, and by officers  when  engaged by prospective
applicants. 
Pre-application assessment of proposals  seeks to identify  all
relevant issues which will be material to the determination of a
subsequent application, and will involve engagement with consultees
where appropriate. The  report template issued to applicants was
revised during 17/18 to include a dedicated section identifying the
requirement for supporting information  - this list is populated
following a review of relevant planning constraints and the advice of
consultees (including other Council Services) to ensure that any
request for further information is  specific and proportionate to the 
development proposed. Where applicants do not engage at pre-
application stage a similar approach is undertaken to identify issues
and any requirement for further information at an early stage in the
handling of the application.
Applications are validated against the National Validation Standard
published by HoPS to ensure that submissions and requirements for
supporting information are quality checked on a consistent basis.
This  document is also promoted and published on the Council
website to assist applicants in the preparation of their application.
During 2021/22 updated guidance on the submission and processing
of applications under S64 of the Act was prepared and published.
4. Legal agreements: Conclude (or
reconsider) applications within 6
months of ‘resolving to grant’.
Part 1—1.3.14 & Part 5—Table A
Applications subject to legal agreements were determined with an
average time period of 30.3 weeks during 2021/22. Applications
requiring a legal agreement are reviewed regularly and are
highlighted on officers outstanding items case lists.
Planning Performance Framework Report 2021/22

Page 34

33 
PERFORMANCE MARKER EVIDENCE / COMMENTS
5. Enforcement charter: updated /
republished.
Part 1—1.3.4 Part 4—Table C, Case Study 5
The Planning Enforcement and Monitoring Charter was been reviewed
and updated in March 2022. During 2020/21 this was augmented by a
Position Statement on the temporary relaxation of planning control
within town centres, and an addendum to the Charter covering more
general Covid-19 related issues which remain in place until 30th
September 2022.
6. Continuous improvement: 
 Show progress/improvement in
relation to PPF National
Headline Indicators;
 Progress ambitious and
relevant service improvement
commitments identified through
PPF report. 
Part 4—Tables A, B, C & Context D, Case Study 5. The impact of the
Covid-19 pandemic and a lack of availability of planning professionals
has had a significant adverse effect upon performance of decision-
making timescales during 2021/22.
Part 3 details previous and committed Service Improvements.
Contextual commentary on delivery/identification of improvements is
included within:
Part 1—1.1.4, 1.1.5, 1.2.2, 1.2.4, 1.2.15, 1.3.9, 1.3.11, 1.3.13, 1.3.14,
1.4.9, 1.4.11, 1.4.13, 1.4.15, 1.4.17 and Part 5 Table A
7. Local Development Plan: Less than
5 years from adoption.
The Local Development Plan was adopted in 2015.
Argyll and Bute Local Development Plan 2015 
8. Development plan scheme:
Demonstrates next LDP
 On course for adoption within 5
year cycle.
 Project planned and expected
to be delivered to planned
timescale.
LDP2 is project planned with careful management and reporting of any
adjustments, LDP 2 is currently at Examination stage and is currently
scheduled for adoption in 2023.
Argyll and Bute Local Development Plan Scheme March 2022
9. Elected members engaged early
(pre– MIR) in development plan
preparation: if plan has been at pre
-MIR stage during reporting year.
N/a
10. Cross sector stakeholders,
including industry, Agencies and
Scottish Government, engaged
early (pre-MIR) in development plan
preparation - if plan has been at pre
-MIR stage during reporting year.
N/a
Planning Performance Framework Report 2021/22

Page 35

34 
PERFORMANCE MARKER EVIDENCE / COMMENTS
11. Production of regular and
proportionate policy, advice, for
example through supplementary
guidance, on information required
to support applications.
The Make a Planning Application section of the Council website
provides applicants with information that they need to consider before
making an application.
Argyll and Bute - Planning Application Info
The Central Validation Team contributed to the development of and
have subsequently adopted the National Validation Standard
published by HoPS in 2017. Officers have participated in HoPS
ongoing review of this document during 2020/21. Part 1—1.4.9
HoPS National Validation Standard
Supplementary non-statutory planning guidance is reviewed and
updated regularly. Current publications include Houses in Multiple
Occupation, and Advertisements, Masterplanning, and Biodiversity.
During 2021/22 the Council has published updated guidance on S64
submissions and Local Place Plans.
12. Corporate working across services
to improve outputs and services for
customer benefit (for example:
protocols; joined up services; single
contact; joint pre-application
advice.)
Part 1—1.1.6, 1.2.1, 1.2.3, 1.2.4, 1.2.5, 1.2.6, 1.2.8, 1.2.9, 1.2.10,
1.2.11, 1.2.12, 1.2.13, 1.2.14, 1.2.15, 1.3.1, 1.3.4, 1.3.5, 1.3.6, 1.3.7,
1.3.12, 1.4.3, 1.4.5, 1.4.6, 1.4.12, 1.4.13, 1.4.15, 1.4.16, 1.4.18 &
Case Studies 1, 2, 3, 4, 5 & 6
13. Sharing good practice, skills and
knowledge between authorities.
Part 1—, 1.1.4, 1.1.6, 1.2.7,. 1.2.15, 1.3.8, 1.4.2, 1.4.6, 1.4.7, 1.4.8, 
1.4.9, 1.4.10, 1.4.12, 1.4.17, 1.4.18 & Case Studies 2 & 5
14. Stalled sites / legacy cases:
Conclusion / withdrawal of planning
applications more than one year old.
Part 1—1.3.13, & Part 4—Table B.
During 2021/22 27 legacy cases were cleared. At  31st March 2022
there were  65 ‘live’ legacy applications undetermined. 
15. Developer contributions: Clear
expectations set out in development
plan and in pre-application
discussions.
The adopted Local Development Plan sets out  expectations in
respect of Developer Contributions for affordable housing and green /
play space and is supported by Supplementary Guidance which sets
out that the Council will seek appropriate elements of planning gain
proportionate to the scale, nature, impact and planning purposes
associated with the development.
Where Developer Contributions are required these will be flagged up
at pre-application stage where applicable, or where no pre-
application engagement is sought then officers will seek to make the
developer aware of the requirement and justification for any
developer contribution as soon as such a requirement is identified in
the assessment process. 
The Council is continuing to review its approach to Developer
Contributions in the production of LDP 2 and where appropriate the
Council shall seek appropriate developer contributions in liaison with
participating partners and developers which are proportionate to the
nature, impact and planning purposes associated with the
development, and shall be in accord with the Policy Tests set out in
Circular 3/2012.
Planning Performance Framework Report 2021/22

Page 36

35
Service Improvements Part 3:
SERVICE IMPROVEMENTS TO BE DELIVERED IN 2022/23
DELIVERY ON SERVICE IMPROVEMENTS ACTIONS FOR 2021/22
COMMITTED SERVICE IMPROVEMENT ACTIONS
1. Retain Customer Service Excellence Award
2. Delivery of LDP 2 (ongoing - see  Argyll and Bute Local Development Plan Scheme March 2022 )
3. Run Sustainable Design Awards (ongoing - launched Feb 2020)
4. Production of Short Term Letting Planning Guidance (programmed for 2022/23)
5. Production of Hill Tracks Guidance (subject to Scottish Government review of ‘PDR’)
6. Implement improved workflow and performance management systems within the Development
Management Service (project initiated 2021/22 to replace existing systems with IDOX Enterprise and DMS)
7. Review of Validation Processes (on-going engagement with regular customers and review/promotion of HoPS
National Validation Standards to improve proportion of applications valid upon receipt)
8. Deliver Dunoon CARS (Conservation Area Regeneration Scheme) project (ongoing - 90% delivery
complete)
9. Deliver Rothesay TH (Townscape Heritage) project  (ongoing - completion due 2022/23)
10. Deliver Ardrishaig Public Realm Works (programmed to commence 2022/23)
11. Deliver Lochilphead CARS (Conservation Area Regeneration Scheme) (project ongoing - 15% complete)
12. Deliver Lochgilphead Front Green Public Realm Works Project (ongoing - completion due 2022/23)
SERVICE IMPROVEMENT STATUS
1. Retain Customer Service Excellence Award Delivered - see Part 1 - 1.2.4, 1.4.15
2. Deliver 2 pilot Simplified Planning Zones Discontinued - see Part 1 - 1.2.16
3. Prepare 2 Conservation Area Appraisals On Hold - see Part 1-1.4.11
4. Deliver LDP 2 Progressing - Adoption planned 2022 - see Part 1 -
1.2.2, Part 2 - KPI Table (8),Part 4 - Table A & C
5. Run Sustainable Design Awards On Hold - Launched Feb. 2020 but currently on hold
due to Covid-19 - Part 1 - 1.1.4
6. Production of Hill Tracks Non-Statutory Technical
Guidance
On Hold - Awaiting outcome of Scottish
Government review of ‘Permitted Development
Rights’ - see Part 1 - 1.4.17
7. Implement improved workflow and performance
management systems within the Development
Management Service.
Progressing - Part 1 - 1.3.9, 1.3.10, 1.3.13, 1.3.14,
1.4.2, 1.4.3, 1.4.8, 1.4.9, 1.4.13, 1.4.14
8. Review of Validation Processes  On Hold - see Part 1 - 1.4.9
9. Deliver Dunoon CARS  Progressing - see Part 1 - 1.1.6
10. Deliver Rothesay TH (Townscape Heritage) project Progressing - see Part 1 - 1.1.6
11. Deliver Tarbert and Ardrishaig Regeneration Fund
project Progressing - see Part 1 - 1.1.6
12. Deliver Lochilphead CARS (Conservation Area
Regeneration Scheme) project  Progressing - see Part 1 - 1.1.6

Page 37

National Headline
Indicators (NHI’s)
2021/22 Part 4:
A: KEY OUTCOMES—DEVELOPMENT PLANNING 2021/22 2020/21
Local and Strategic Development Planning 
Age of local / strategic development plan(s) at end of reporting period.
Requirement: less than 5 years.
7 years 6 years
Will the local / strategic development plan(s) be replaced by their 5th
anniversary according to the current development plan scheme?
No No
Has the expected date of submission of the plan to Scottish Ministers
in the development plan scheme changed over the past year?
Yes Yes
Were development plan scheme engagement / consultation commit-
ments met during the year?
Yes Yes
Effective Housing Land Supply 
Established housing land supply    5406 units 5310 units
5-year effective housing land supply   2684 units 2889 units
5-year effective land supply total capacity  5162 units 4998 units
5-year housing supply target  1500 units 1500 units
5-year effective housing land supply (to one decimal place) 8.95 years 9.63 years
Housing approvals 507 units 509 units
Housing completions over the last 5 years 1201 units 1084 units
Marketable employment land supply  85.0 ha 85.7 ha
Employment land take-up during the reporting period 0.7 ha 0.7 ha
B: KEY OUTCOMES—DEVELOPMENT MANAGEMENT 2021/22 2020/21
Project Planning 
Percentage and number of applications subject to pre-application ad-
vice
7%(84) 11.9%(126)
Percentage and number of major applications subject to processing
agreement
- -
Decision Making 
Application approval rate 98.0% 97.9%
Delegation rate 97.7% 98.5%
Validation 19.2% 21.5%
Decision-making Timescales 
Major Developments 40.8 weeks  40.4 weeks
Local Developments (non-householder) 13.6 weeks 12.5 weeks
Householder Developments  10.3 weeks 9.1 weeks
Legacy Cases 
Number cleared during reporting period 27 17
Number remaining 65 57
Planning Performance Framework Report 2021/22
36
1
3
2

Page 38

D: NHI KEY OUTCOMES COMMENTARY:
1. It is noted that this NHI is not wholly reflective of the uptake of employment land within
Argyll and Bute where the rural nature of the Council area and local economy stimulates
demand for development in locations that are not readily addressed through take up of
allocated land. The Council’s settlement strategy seeks to promote sustainable economic
development and focuses allocation of employment land in and around existing key
settlements where there is demand of employment, existing housing provision and
infrastructure to support new development. The LDP does however recognise that the
requirements of traditional rural industries, particularly those which are island based
including the whisky industry and aquaculture, will give rise to occasional demand for
development in countryside locations - our settlement strategy is sufficiently flexible to
accommodate this demand but it also means that take up of land for employment purposes
is not wholly captured in the NHIs.
2. It is has been established that this data set is incomplete and does not currently provide an
accurate reflection of the number of planning applications that have been subject to pre-
application advice. 582 pre-application enquiries were received during the reporting period,
this figure is representative of 52% of the volume of statutory determinations within the
same period.
3. It is noted that the data subset for ‘major’ applications is small and easily skewed.
Contextual commentary on other factors affecting decision-making timescales are set out
within Part 5 C of the report. 
C: KEY OUTCOMES—ENFORCEMENT 2021/22 2020/21
Time since enforcement charter published / reviewed  1 months  12 months
Complaints lodged and investigated 228 224
Breaches identified - No further action taken  177 - 51  170 - 54
Cases Closed 109 119
Notices served 18 22
Direct Action 0 0
Reports to Procurator Fiscal 0 0
Prosecutions 0 0
Planning Performance Framework Report 2021/22
37

Page 39

Official Statistics Part 5:
A: DECISION-MAKING TIMESCALES (based on ‘all applications’ timescales) 
Timescales 2021/22
No of Cases (%)
2021/22
Weeks
2020/21
Weeks
Overall 
Major developments 6 40.8 40.4
Local developments (non-householder) 621 13.6 12.5
 Local: less than 2 months 275 (44.3%) 7.1 6.8
 Local: more than 2 months 346 (55.7%) 13.6 15.0
Householder developments 350 10.3 9.1
 Local: less than 2 months 179 (51.1%) 7.0 6.6
 Local: more than 2 months 171 (48.9%) 18.8 13.5
Housing Developments
Major 1 76.3 19.5
Local housing developments 287 13.1 12.1
 Local: less than 2 months 121 (42.2%) 7.2 6.9
 Local: more than 2 months 166 (57.8%) 18.8 16.1
Business and Industry 
Major 1 9.7 -
Local business and industry developments 15 11.9 12.7
 Local: less than 2 months 5 (33.3%) 7.3 7.0
 Local: more than 2 months 10 (66.7%) 14.2 17.1 
EIA Developments 2 25.2 -
Other Consents 142 13.0 9.0
Planning / Legal Agreements 14 33.6 15.5
 Major: average time 1 76.3 -
 Local: average time 13 30.3 15.5
B: DECISION-MAKING: LOCAL REVIEWS AND APPEALS
Total Number
of Decisions
Original Decision Upheld
Type
2021/22 2020/21
No. % No. %
Local reviews 8 6 33.3 6 75.0
Appeals to Scottish Ministers 5 1 20.0 1 33.3
Planning Performance Framework Report 2021/22
38

Page 40

C: Context
Development Management Service:
Argyll and Bute Council’s Development Management Service continues to process planning
applications with the aspiration to deliver positive outcomes in all cases. This approach is
reflected in our high approval rates but is often achieved by providing applicants with additional
time beyond prescribed statutory determination periods where this is required to negotiate and
address resolvable deficiencies in their submissions. Whilst it is recognised that this approach
can have a negative impact upon performance in decision-making time periods it is contended
that this is outweighed by the economic benefits of delivering on improved development
proposals which might not otherwise have obtained permission had the Council sought to
determine within prescribed statutory time periods; additionally resources required to handle
amended applications, appeal and LRB work is minimised. 
Service delivery arrangements continue to be impacted by the impact of the Covid-19 pandemic;
in particular the Service is experiencing a high volume of demand as a wide range of
developments delayed by the pandemic have sought planning permission during 2021/22. This
period of high demand has coincided with a period of high staff turnover, difficulties in recruiting 
in a market where there is a lack of available planning professionals (an issue known to be a
national rather than local issue and are discussed by Heads of Planning Scotland and the RTPI
in their Future Planners Project Report July 2022) and higher absence rates attributable in a
large part to Covid and stress related illness. During this period the Service has lost a number of
experienced professional officers and required to operate with vacancies in key positions for
extended periods of time in some cases for 12 months or longer. The resilience of the Service to
operate efficiently with reduced resource and high volume of casework had already been eroded
through previous requirements to make budget cuts and reduce staffing numbers in previous
years. Whilst temporary measures have been taken to maintain a critical level of service delivery
through use of overtime and use of external resources to process planning applications it is
expected that overall performance will remain impacted until staffing issues are addressed
through filling of vacancies. The Scottish Government’s reform of statutory planning fees from 1st
April 2022 is welcomed but came too late to address resource issues arising in 2021/22.
Development Policy Service:
Following approval of Schedule 4’s by Council it took the Development Policy team
approximately 4 months to prepare all documentation in the required electronic format for
submission to the DPEA. 
The LDP2 along with associated documents was submitted to the DPEA in January 2022.
Reporters have now been appointed and it is anticipated that the Examination will run until the
end of 2022.
It should be noted that until the new Local Development Plan is adopted, the current Local
Development Plan’s statutory status remains, including that of the associated Supplementary
Guidance. The current LDPs made plans for ten years from adoption, so until 2025, and are still
considered to be robust. The LDP contains an effective land supply with the latest Housing Land
Audit showing an effective supply of 3738 units or 5.02 years supply as at 1 April 2022, thus
taking us to 2026 well beyond the proposed adoption date of LDP2. The proposed growth areas
of Tobermory – Dalmally and Helensburgh and Lomond have sufficient supply to take us beyond
the adoption of LDP2. Planning applications will continue to be processed as normal during the
delay period, being assessed against the Adopted plan. An updated Development Plan Scheme
was approved by elected members in March 2022 that re-programmes the planned adoption date
to early 2023.
39

Page 41

Workforce Information
(at 31.03.21) Part 6: 
Tier 1 
Chief Executive
Tier 2
Director
Tier 3
Head of Service
Tier 4
Manager
Head of Planning Service    
RTPI Qualified Staff Number
Head of Service 1
Development Management 9
Development Policy 3
Enforcement 1
Projects and Regeneration 3
Staff Age Profile %
Under 30 7.4
30 - 39 51.9
40 - 49 33.3
50 and over 7.4
Service Overview
Planning Services includes: 
Development Management;
Development Policy &
Housing; and 
Projects and Regeneration. 
Planning Services sit within the
Development & Infrastructure
Services Department, and
within the portfolio of the Head
of Development & Economic
Growth which also includes
responsibility for the
complimentary activities of: 
Regulatory Services;
Economic Growth;
Rural Growth Deal Programme; 
Strategic Transportation &
Infrastructure; and,
project specific activity relating
to Oban Strategic Development
Framework including Lorn Arc
regeneration activities.
40
Planning Performance Framework Report 2021/22
Staff Structure Diagrams as at 31.03.2022
Development & Economic
Growth

Page 42

Planning Performance Framework Report 2021/22
41
Development Policy & Housing
* Note: Housing Services Staff not shown
Development Management

Page 43

Planning Performance Framework Report 2021/22
42
Projects and Regeneration
Planning Committee
Information Part 7:
Committees & Site Visits Number
Full Council Meetings 7
Planning Committees 14
Area Committees 12
Local Review Body 19
LRB Site Visits 0

Page 44

No embedded text on this page.