Item 4(ii) LRB-2023-16
Perth and Kinross Council · 3 July 2023
Back to Local Review Body — 3 July 2023 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
4(ii) LRB-2023-16 LRB-2023-16 – 22/01279/FLL – Change of use and alterations to agricultural building and workshop to form 3 holiday accommodation units, Easdale, Weem, Aberfeldy, PH15 2LD INDEX (a) Papers submitted by the Applicant (Pages 125-172) (b) Decision Notice (Pages 171-172) Report of Handling (Pages 175-182) Reference Documents (Pages 183-214) (c) Representations (Pages 215-226) 123
Page 2
124
Page 3
4(ii)(a) LRB-2023-16 LRB-2023-16 – 22/01279/FLL – Change of use and alterations to agricultural building and workshop to form 3 holiday accommodation units, Easdale, Weem, Aberfeldy, PH15 2LD PAPERS SUBMITTED BY THE APPLICANT 125
Page 4
126
Page 5
127
Page 6
128
Page 7
129
Page 8
130
Page 9
1 Glen Blackler, Glenalmond, Perthshire PH1 3SF Tel: (H) 01738 880 373 (M) 07922 442 107 Email: gdimeckplanning@gmail.com www.garrydimeckplanning.co.uk Local Review Body Perth & Kinross Council Committee Services Council Building 2 High Street Perth PH1 5PH April 06 2023 Dear Sirs, Submission of Request for Local Review Planning Application: 22/01279/FLL Proposal: Change of use and alterations to agricultural building and workshop to form 3 holiday accommodation units Site: ‘Easdale’, Weem, Aberfeldy, PH15 2LD On behalf of the applicant, Mr R Tainsh I am pleased to submit this request for a review of decision of Planning Application 22/01279/FLL. This request is submitted within 3 months of the Refusal decision and I attach here: • Applicants Review Forms; • Applicants Review Statement with Appendices (A-D) • Appendix A – Photographs of Site and Setting • Appendix B – Case Summary • Appendix C – List of Development Plan Policies satisfied by proposals • Appendix D – Plan showing additional land in ownership of applicant which can be used to deliver new planting as a natural flood management measure. • Application Refusal Notice; Please Note Appendix D did not form part of the original submission. However, the planting is suggested as a means of delivering an improvement to the water environment as a public amenity gain. The land is in the ownership of the applicant. Yours faithfully GDimeck BTP MRTPI 131
Page 10
132
Page 11
www.garrydimeckplanning.co.uk 1 | P a g e S43A(8) REVIEW OF PLANNING DECISION CHANGE OF USE AND ALTERATIONS TO AGRICULTURAL BUILDING AND WORKSHOP TO FORM 3 HOLIDAY UNITS 0N LAND AT ‘EASDALE’, WEEM, ABERFELDY, PH15 2LD WRITTEN SUBMISSION OF MR R TAINSH (APPLICANT) IN RESPECT OF PLANNING REFUSAL 22/01279/FLL APRIL 2023 133
Page 12
www.garrydimeckplanning.co.uk 2 | P a g e DOCUMENT ISSUE RECORD Client Mr R Tainsh Contact Details c/o GD Planning Ltd Glen Blackler Glenalmond Perth PH1 3SF Name Title Prepared By: G Dimeck BTP MRTPI Principal Planner GD Planning Ltd Approved By: G Dimeck BTP MRTPI Director GD Planning Ltd Date of Issue: 06 April 2023 Issue Date Version 1 18 March 2023 Draft Internal Review 2 06 April 2023 Client Draft 3 06 April 2023 Finalised Statement www.garrydimeckplanning.co.uk 134
Page 13
www.garrydimeckplanning.co.uk 3 | P a g e DISCLAIMER This Statement has been prepared for the use of Mr Tainsh to support a submission to Perth & Kinross Council’s Local Review Body and should not be reproduced in whole or part, nor relied upon by any third party, for any use whatsoever, without the express written authorisation of GD Planning Ltd. If any third party comes into possession of this report, they rely on it at their own risk. GD Planning Ltd accepts no duty or responsibility (including in negligence) to any such third party. 135
Page 14
www.garrydimeckplanning.co.uk 4 | P a g e CONTENTS 1.0 Introduction ……………………….…………………………………………………………………………………………………………………….5 2.0 Location………………………………………………………………………………………………………………………………………………….7 3.0 Proposal………………………………………………………………………………………………………………………………………………….8 4.0 Reasons for Review…………………………………………………………………………………………………………………………………….9 5.0 Process of Review……….……………………………………………………………………………………………………..……………….……10 6.0 Submitted Documents …………………………………………………………………………………….……………………………………...10 7.0 The Development Plan……………………………………………………………………………………………………………………………..10 8.0 Response to Refusal Reason……………………………………………………………………………………………….…………………….11 9.0 Conclusion………………………………………………………………………………………………………………………………………………..23 Appendix A Photographs of site and setting Appendix B Key point summary of Case Appendix C Development Plan Policies satisfied by proposals Appendix D Other land in applicant ownership 136
Page 15
www.garrydimeckplanning.co.uk 5 | P a g e 1.0 INTRODUCTION 1.1 The building the subject of this review is a redundant agricultural barn within the former Weem Farm steading group. The group comprises farmhouse together with a range of traditional stone and slate farm buildings. Fig 1 Steading group at heart of village visible from B846 1.2 Part of the range has been converted to residential use, with planning permission. That dwelling is the applicants home and is linked to the application site. Part of the remainder benefits from an unimplemented planning permission for a second dwelling. Fig 2 Converted barn (applicants home) with unimplemented planning permission for conversion to residential use circled 1.3 The review building is attached to, and is an integral part of the range, and is located to the rear. 137
Page 16
www.garrydimeckplanning.co.uk 6 | P a g e . Fig 3 Review building is located to the rear of the Weem Farm steading range Figs 4 Review building, attached to, and located to the rear of, the Weem Farm steading range 1.4 This is a historic building group (early 19th Century), which largely remains intact, although the adjacent smithy buildings (see historic map below), has since been demolished. Figs 4 & 5 1862 Six-inch Survey & aerial view today 138
Page 17
www.garrydimeckplanning.co.uk 7 | P a g e 2.0 LOCATION 2.1 The steading group is prominently sited adjacent to the road (B846), at the heart of Weem. 2.2 LDP2 identifies Weem as a historic village, and defines a settlement boundary to allow for small- scale infill development to help sustain the community. 2.3 The application site lies within that village settlement boundary. Fig 6: Weem settlement boundary (black line) and application site 2.4 The whole of the village is behind a permanent Flood Protection Scheme (FPS) which was constructed in 2006 and is maintained by PKC. This comprises a 4m high earth bund at the southern edge of the village, and provides a physical obstruction beyond the boundary of the application site. 2.5 In addition, on land immediately adjacent, is a pump house which forms an essential element of the village FPS, and which can return standing surface water to flood plain. 2.6 The extent and route of the Flood Barrier is identified on the plan below (Fig 7). 139
Page 18
www.garrydimeckplanning.co.uk 8 | P a g e Fig 7 Flood Defence bund shown by solid red line and location of application site identified Fig 8 Weem Flood Defence bund – approximately 4m above flood plain adjacent to application site 2.7 The whole of the village of Weem lies within the Strath Tay Local Landscape Area (LLA). 3.0 PROPOSALS 3.1 The proposals will create 3 x 1bed, self-contained holiday letting units, available for let year- round. The units would be managed by the applicant who lives in the converted barn adjoining. 3.2 The target market is the active, short-stay, traveller (walker, cyclist, tourer, climber), and the site is well- placed to access the recreational, environmental and historic assets of Highland Perthshire, including the new Weem Rock Mountain Biking course, and local Rafting and Quad bike facilities. single night 4m 140
Page 19
www.garrydimeckplanning.co.uk 9 | P a g e
3.3 The applicants own research has identified a shortage in the area of self-contained
accommodation available for bookings (ie suitable for the walker and/or touring cyclist), with most letting
establishments requiring a minimum two-night stay. With planning permission, the applicant would
apply to PKC for a short-term letting license.
3.4 Private courtyards will be created on the eastern side of the building providing amenity space and
bin storage for each of the units.
3.5 Vehicular access would be from the B846 by way of an existing tarmaced driveway along the east
side of the building with parking and turning provided at the southern end of the building.
3.6 Accommodation would be arranged across two floors, with first floor bedrooms lit by rooflights
and new dormers.
3.7 The Planning Officer has not raised concern with the proposed use; the manner of conversion; or
the relationship with adjacent properties.
4.0 REASON FOR REVIEW
4.1 The submitted application was refused for one reason only:
1. The site is located within an area identified by SEPA as being at medium risk of flooding (1:200 or
0.5% AEP flood event). Notwithstanding the level of protection that is offered by the Weem Flood
Protection Scheme, the proposed holiday accommodation would increase the vulnerable classification
on the site from a 'least vulnerable use' (agriculture) to a 'highly vulnerable use' ('solid' walled holiday
accommodation), as per SEPA Flood Risk and Land Use Vulnerability Guidance. The proposal is therefore
contrary to the principles and aims of Policy 52 of the adopted Perth and Kinross Local Development
Plan 2 (2019), SEPA Planning Information Note 4 (PIN4), the Scottish Planning Policy 2014 and Policy 24
of the emerging National Planning Framework 4 (2023) which all look to protect new land uses from
unacceptable flood risk.
Justification: The proposal is not in accordance with the Development Plan and there are no material
reasons which justify departing from the Development Plan.
4.2 It is a concern to the applicant that in concluding that the proposal fails to accord with the
Development Plan, little weight in the balance of the decision, has been given to important policy
gains:
• Economic and community benefits of the proposal (LDP2 Policy 8);
• Preservation of an important heritage asset (LDP2 Policy 31);
• The positive contribution the building provides to the Strath Tay Local Landscape Area; (LDP2 Policy 39)
141Page 20
www.garrydimeckplanning.co.uk 10 | P a g e • The potential to deliver positive biodiversity improvements at the site (LDP2 Policy 41). • The extent to which the site is already protected from flooding (LDP2 Policy 52); & • The potential to positively improve the water environment (LDP2 Policy 53); 4.3 Furthermore, neither the Community Council, nor third-parties raise objection to the proposals, and no concerns have been raised by SEPA. 5.0 PROCESS OF REVIEW 5.1 The applicant considers that a written process of Review together with Site Inspection would be an appropriate mechanism for appraisal of the issues raised in this case. This would enable the LRB Members to view the proposal in its local context and understand the qualities of the building group. 6.0 SUBMITTED DOCUMENTS 6.1 Together with the application documentation, the following are presented to support this Review Statement and assist Members understanding of the proposal: • Existing photographs of building and wider setting (Appendix A to this Review Statement); • A short, key-point summary of the applicants case (Appendix B to this Review Statement). • Development Plan Policies satisfied by the proposals (Appendix C to this Review Statement) • Plan identifying other land in applicant ownership (Appendix D to this Review Statement) 7.0 THE DEVELOPMENT PLAN Role of the Development Plan 7.1 The Town & Country Planning (Scotland) Act 1997, requires a Planning Authority, to determine planning applications in accordance with the Development Plan unless material considerations indicate otherwise (Sections 25 & 37(2)). 7.2 When interpreting the Development Plan, relevant case law has determined that it should be read as a whole, with a focus on relevant objectives and policies which give effect to sustainable development objectives which underpin the Plan (Tesco Stores Limited v Dundee City Council [2012] UKSC 13). 7.3 In taking a decision on any application the Planning Authority is required to consider more than just conflict with any single policy before determining conflict with the Development Plan as a whole (Cummins v L B Camden [2001] EWHC Admin 1116).7.4 Put simply, it is rare that any proposal will meet all the policies of a Development Plan. Refusal can be expected where adverse impacts significantly and demonstrably outweigh the benefits, when assessed against Plan policies taken as a whole. 142
Page 21
www.garrydimeckplanning.co.uk 11 | P a g e The Development Plan 7.4 The Development Plan is made up of National Planning Framework 4 (NPF4), and the Perth & Kinross Local Development Plan 2 (LDP2). Appendix C to this Review Statement sets out the many Development Plan Policies which would be satisfied by the proposals. 8.0 RESPONSE TO REFUSAL REASON 8.1 It is the applicants firm view that the following matters should be weighed in the balance of any planning decision: Flood Risk 8.2 There would appear to be confusion about the extent to which the site is exposed to fluvial flooding. Given the specific reason for Refusal, it is important to clarify that risk, and to examine relevant SEPA guidance pertaining to that risk. 8.3 In raising objection the PKC Flood Officer asserts that the application site is a location subject to a medium to high risk of fluvial flooding. 8.4 The Refusal reason itself refers to the application site as a location subject to a medium risk of flooding. 8.5 SEPA Flood Map shows the application site to be at medium to low risk of fluvial flooding, with the building clearly lying outside of the high risk flood zone, which is shown to correspond with the existing village flood defence barrier, (see Figs 9 & 10 below). Fig 9 SEPA Flood Map: Application site in relation to high risk fluvial flood areas 143
Page 22
www.garrydimeckplanning.co.uk 12 | P a g e Fig 10 SEPA Flood Map: Application site in relation to medium & low risk fluvial flood areas SEPA Guidance 8.6 The refusal reason simply states that as a highly vulnerable use (as determined by SEPA’s Flood Risk & Land Use Vulnerability Guidance) the proposal is contrary to the principles and aims of SEPA’s Flood Guidance, in particular, Flood Risk and Land Use Vulnerability Guidance & Planning Information Note 4 (PIN4). SEPA Flood Risk and Land Use Vulnerability Guidance (July 2018) 8.7 This guidance uses a matrix (Table 1) to categorise the vulnerability of differing developments to flooding, and although not categorised as the most vulnerable of uses, a residential use is considered to be a highly vulnerable use (Table 1). 8.8 The matrix then identifies where, in terms of flood risk, such uses can be supported (Table 2). 8.9 As the Flood Map extract shows (Fig 10 above) the application building is within a low to medium flood risk area. 8.10 An extract from Table 2 is produced below (Fig 12) and the corresponding locational advice for highly vulnerable uses makes clear that they will generally be suitable for location within all low to me- dium risk flood areas (Table 2 extract – see below). 144
Page 23
www.garrydimeckplanning.co.uk 13 | P a g e Fig 12 Extract from SEPA Flood Risk and Land Use Vulnerability Guidance (July 2018) – Low to medium flood risk areas 8.11 Within medium to high risk flood areas, the same Table 2 (see Fig 13 below) makes clear that in ‘built-up areas’, highly vulnerable uses although generally not be suitable for development, can find support in certain circumstances. This will be where a settlement boundary has been defined by an up-to-date and adopted Development Plan; and SEPA Flood Guidance has not changed in the interim. Fig 13 Extract from SEPA Flood Risk and Land Use Vulnerability Guidance (July 2018) – Medium to high risk flood risk areas 145
Page 24
www.garrydimeckplanning.co.uk 14 | P a g e 8.12 A ‘built-up area’ is defined in the Guide as a location within the settlement boundary of a village, where such a boundary has been defined by the Development Plan, and where the adjoining land uses are predominantly developed in nature. 8.13 The application building at Weem is within such a ‘built-up’ area. Settlement Boundary 8.14 LDP2 is a Development Plan which is up-to-date (2019), and its adoption post-dates both SEPA’s Flood Risk and Land Use Vulnerability Guidance and its Planning Information Note 4. In relation to Flood Risk and the water environment, SEPA were a key consultee in the production of that docu- ment. 8.15 The Plan promotes a sustainable, spatial development strategy which can provide for growth and community needs within environmental limits. To that end, each town and village has been reviewed and, where appropriate, settlement boundaries defined within which new development, including housing, can be supported in principle (LDP2 Policy 6). 8.16 The Plan defines a settlement boundary at Weem & Boltachan. There are no specific site alloca- tions for housing, and the settlement summary notes indicate that a boundary has been drawn to al- low for some small-scale infill development, to help sustain the two communities (see Fig 13 below). That settlement boundary has been set outside of the high risk flood area shown on SEPA’s Flood Map, and behind the village Flood Barrier. It incorporates land within the low to medium flood risk ar- eas. 8.17 Delivering small-scale infill development in Weem, through the residential conversion of redun- dant historic buildings within the settlement, would accord with the development strategy of the adopted plan, and would meet a number of Policies which seek to deliver sustainable development (Policies 1; 6; 17 & 31), and NPF4 (Policies 9, 14 &29). 8.18 In this case, the principle of development is clearly supported by the settlement strategy of an up-to-date, adopted Development Plan; and SEPA ‘s guidance has not been updated since Plan adop- tion. 146
Page 25
www.garrydimeckplanning.co.uk 15 | P a g e Fig 13 LDP 2 extract – settlement summary with application site clearly shown within settlement boundary at Weem SEPA Planning Information Note - 4 July 2018 8.19 The SEPA Planning Information Note 4 (PIN4) also referred to in the Refusal Reason is distilled from SEPA’s more comprehensive Planning Background Paper – Flood Risk (July 2018). 8.20 It outlines an approach of general avoidance of any proposed development within areas pro- tected by flood barriers, but accepts that proposals which do not increase overall flood risk, and which are locations where the principle of development is supported by an up-to-date Development Plan, may find support (ie built-up areas within settlement boundaries). . SEPA Planning Background Paper – Flood Risk (July 2018) 8.21 This comprehensive document accompanies the Flood Risk and Land Use Vulnerability Guidance and sets out, more fully, SEPA’s position generally, in relation to Flood Risk and Flood Management. 8.22 In terms of its consultation role with Planning Authorities at Development Plan production stage, it states: 147
Page 26
www.garrydimeckplanning.co.uk 16 | P a g e ……..We work jointly with planning authorities to ensure that flood risk has been afforded due weight throughout the plan preparation. This includes all potential development allocations (including those that have been included in previous plans), the policy framework and supplementary guidance. ……… & To help achieve this, we have clarified the requirements and recommendations relating to flood risk that we con- sider should be addressed through strategic and local development plans (DP.1 & DP.2). 8.23 SEPA were key consultees in the preparation of LDP2 and the settlement boundary at Weem, an integral part of the Development Plan, encompasses the application building. The settlement bound- ary has been drawn within the low to medium risk Flood areas. 8.24 In relation to development within ‘built-up areas’ behind Flood Protection Schemes (FPS), the Pa- per sets out SEPA’s development management expectations (DM.34). Whilst highly vulnerable uses should incorporate design standards to achieve 0.5% (200 year) plus climate change protection; devel- opment may be appropriate behind any FPS, if it meets any one of the criteria (a-d) as set out in DM Requirement 1 (DM36). 8.25 Criterion (d) of DM Requirement 1 provides for development in locations where the principle of the proposed development has been established by an up-to-date, adopted Development Plan, but any development should be built to a water resilient design and have adequate evacuation proce- dures in place (DM16). 8.26 Elsewhere the Flood Risk Background Paper identifies that • within any fluvial flood risk area, it may be possible to manage flood risk to enable development (DM.24); • redevelopment of a building can provide a valuable opportunity to reduce the vulnerability of a site to flooding, reducing overall flood risk (DM27); & • Whilst Planning Authorities are encouraged by SEPA to consider changes to less vulnerable uses (DM. 28); redevel- opment could be considered acceptable if suitable mitigation measures are introduced to avoid a net increase in flood risk on or off site (DM.29). 8.27 The paper states that mitigation measures for the management of flood risk on a site can include flood resilient design; reducing off-site flooding (DM30), provision of adequate access and egress (DM.84); evacuation plan (DM.87); and increased freeboard (DM.97). These mitigation measures can be delivered by way of condition on any planning approval. LDP2 Flood Policy 8.28 In addition to defining a settlement boundary for Weem, LDP2 also includes a specific policy relating to Flooding (Policy 52). The Refusal reason contends that the proposals are contrary to that policy. 148
Page 27
www.garrydimeckplanning.co.uk 17 | P a g e 8.29 In relation to low to medium risk flood areas (ie the application site), the Policy 52: (Category (2) states that such areas are suitable for most forms of development, but should incorporate a freeboard allowance, and use flood resilient materials and construction methods. It is the applicants intention to do so, and these measures can be conditioned as part of any planning approval. Drainage Summary 8.30 In summary, the application site is within an area, shown on the SEPA Flood Map, to be at low to medium risk of flooding on the SEPA Flood Map. 8.31 The Flood Protection scheme at Weem has been in place since 2006 and is maintained by PKC. It provides less than a 200year standard of protection, but does protect existing historic buildings on the application site. 8.32 The PKC Flood Risk Management Plan – Tay Local Plan District (December 2021), commits the Council to maintaining the existing PKC Weem Flood Protection Scheme in good order; and SEPA maintaining its Floodline flood warning service. 8.33 The proposals do not increase the footprint of the building through extension; and flood resilient materials and construction methods can be delivered through the conversion works. 8.34 Although a highly vulnerable use would be introduced through conversion of a historic building, the principle of development is supported by an adopted, up-to-date Development Plan. Other Matters Refusal Reason wording: 8.35 In relation to the wording of the Refusal Notice it should be noted that Scottish Planning Policy has now been superseded by NPF4; and the relevant policy of NPF4 relating to Flooding is now Policy 22, not 24. Landscape Impacts 8.36 A key objective for the Strath Tay LLA, as set out in the Landscape Supplementary Guidance 2020, is to: • Maintain distinctive character of settlements and built development, particularly the Victorian farm buildings often prominent by the roadside. 149
Page 28
www.garrydimeckplanning.co.uk 18 | P a g e 8.37 The application building is an integral part of the range of Victorian farm buildings at the heart of Weem. The buildings are visually prominent and, together with the farmhouse, make a positive contribution to the character of the place, and the quality of the landscape. 8.38 The application building is in poor condition and requires physical upgrade at significant cost (current water ingress; damp, timber rot, masonry failing, re-pointing; rooflight replacement,rhones, flooring, etc). Without a viable new use which can provide an economic return, investment in building upgrade is unlikely. 8.39 The proposals can safeguard the buildings future for the long-term and preserve its positive contribution to local amenity and the character of the area. 150
Page 29
www.garrydimeckplanning.co.uk 19 | P a g e Figs 14 & 17 – Building condition and defects 151
Page 30
www.garrydimeckplanning.co.uk 20 | P a g e Manner of Conversion 8.40 The manner of conversion is sympathetic to the character of the building. The Report of Handling identifies that some minor changes to the appearance of the proposed dormers would be desirable but could be achieved by way of condition of any planning approval. Natural Flood Management 8.41 The SEPA Flood Map shows that areas away from the building, but within the ownership/control of the applicant, experience surface water flooding. Figs 18– Surface water flooding 8.42 Much of this surface water will come from the public road and the higher ground to the north. At times of flooding the existing pump station, maintained by PKC as an integral part of the Weem Flood Protection scheme, pumps excess standing water over the flood barrier to the flood plain. 8.43 Within the application site there are extensive areas of hard-surfacing, some of which is impermeable. 8.44 Removal and replacement with porous tarmac can ensure that surface run-off rate into the site from the B817 is reduced; and that water storage capacity within the site is enhanced. These improvements could be delivered by condition on any planning approval. 152
Page 31
www.garrydimeckplanning.co.uk 21 | P a g e 8.45 Also, planting of other land within the applicants ownership with suitable trees (willow, alder, birch), could also improve storage capacity within the area protected by the PKC Flood embankment; reduce surface-water run-off, absorb and lock-up carbon, and enhance biodiversity. These positive measures could be delivered by way of a suitably worded condition on any planning permission, and attached as Appendix D is an OS plan identifying that land immediately adjacent to the application site. Figs 19–21 Removal of areas of impervious hard-surfacing within the site will improve SUDs drainage and the planting of land adjacent can check run-off rate and enhance surface water storage capacity 153
Page 32
www.garrydimeckplanning.co.uk 22 | P a g e Building Flood Resilience Measures: 8.46 As can be seen from Fig 17 above, installation of a new floor would be necessary as part of any conversion, ensuring the buildings freeboard is raised. Other flood resilience measures could incorporate practical measures such as: • flood boards (Floodshield or similar) fixings provided to external doors; • adoption of water-resistant construction techniques (ie hard-water resistant floors and surfaces incorporated at ground floor); • installation of elevated electrics; • rendered/block work construction at ground floor with timber frame structure above; • provision of toilet protection (eg Floodkit Toilet Stopper or similar www.floodkit.co.uk): 8.47 The applicant as ‘Manager’ would register with SEPA Floodline service. In addition, a Flood warning Evacuation Plan can be put in place providing awareness of the issue for occupiers of the building; mitigation measures to be employed to manage risks; detailing actions required by tenants in the event of flood; and identifying access and egress routes in the event of flood to be providing routes for escape to a low Flood risk area. 8.48 All these practical steps, consistent with the SEPA Guidance, could be delivered by way of planning condition. Economic Benefits 8.49 The Perthshire Tourism Action Plan (2019 – 2025) commits to maintaining and growing Perthshire’s share of the domestic visitor market through ‘responsible tourism’, focussing on day trippers, staycations, workcations; and to growing the length of stay. It expressly commits to maximising extra capacity across the area, promoting day visitors, and converting those visits into overnight stays, by encouraging visitors to base themselves in Perthshire (the Industry recognises that overnight stays will generate significantly larger visitor spend). 8.50 The proposals for short-stay, overnight accommodation for the adventure market, falls comfortably within the Council’s aspirations for growing the visitor economy; and the applicant has already forged links with a number of existing commercial operators who are locally based and provide services to the outdoor tourist sector. 154
Page 33
www.garrydimeckplanning.co.uk 23 | P a g e Use of Planning Conditions 8.49 Conditions imposed on a grant of planning permission can enable many development proposals to proceed where it would otherwise have been necessary to refuse planning permission (SG Planning Circular 4/98 – para 2). 8.50 The use of planning conditions in this case, delivering flood resilience measures, improvements to the appearance of the building and to the water environment, would be reasonable and would meet the statutory tests. 9.0 CONCLUSION Everyone is responsible for protecting themselves and their property from flooding. Property and business owners can take simple steps to reduce damage and disruption to their homes and businesses should flooding happen. This includes preparing a flood plan and flood kit, installing property flood resilience measures, signing up to Floodline, engaging with their local flood group, and ensuring that properties and businesses are insured against flood damage – LDP8 River Tay Flood Risk Management Plan (SEPA 2021) 9.1 Whilst it is acknowledged that there is some flood risk at the application site, it is also clear that within villages with a settlement boundary, where the principle of development is supported by an up-to-date Development Plan, SEPA’s guidance can support the introduction of a highly vulnerable use. 9.2 The principle of infill housing within Weem is a key part of the development strategy set out in LDP2, and Policy 52 of that Plan makes clear that low to medium flood risk areas ill be suitable for most forms of development. 9.3 The proposals deliver relation to low to medium risk flood areas (ie the application site), the Policy 52: (Category (2) states that such areas are suitable for most forms of development, but should incorporate a freeboard allowance, and use flood resilient materials and construction methods. 9.4 Flood resilient materials and construction methods can be incorporated through building conversion; and improvements to the water storage capacity of the site, and the water environment generally, can be delivered. 9.5 The building is in poor condition. The proposals deliver economic, environmental and landscape gains through the introduction of a viable new use. Without that viable new use the building will 155
Page 34
www.garrydimeckplanning.co.uk 24 | P a g e continue to deteriorate, and the quality of the protected landscape, and the placemaking character and interest of Weem, will be diminished. 9.6 The purpose of the planning system is to contribute to the achievement of sustainable development and the applicants have provided sufficient information to demonstrate that sustainable development can be delivered in this case. 9.7 That Plan is required to be interpreted broadly and read as a whole. Consideration is required to be given to the sustainable development objectives which underpin the plan. Any decision taker is required to consider more than just conflict with a single policy (or part of a policy or Guideline) before determining conflict with the Plan as a whole. 9.8 The applicant has shown that there are no adverse impacts which significantly and demonstrably outweigh the benefits which can be delivered in this case. Accordingly, it is respectfully suggested that the presumption in favour of sustainable development set out in the Principal Act, should be applied in this case, and that planning permission should be granted. 156
Page 35
Appendix A Photographs of Site and Setting: Fig 1 The Application building Fig 2 Application Building and Applicants house Fig 3 Application Building 157
Page 36
Fig 4 Application building is part of traditional farm group at the centre of Weem Fig 5 Former barns part converted to residential use. Extant permission for additional dwelling yet to be implemented Fig 6 Application building attached to, and integral part of prominent barn group 158
Page 37
Fig7 Prominent barn group at village centre Fig 8 Impermeable surfacing within application site Fig9 Part of area prone to surface water flooding and available for new planting delivering natural flood management (pump houses to rear) 159
Page 38
160
Page 39
Appendix B Key point summary of case: Fig 1 The Appeal building Fig 2 Appeal Building and Applicants house A Review Statement has been prepared to directly respond to the single reason for refusal, and to identify other planning policy objectives which are satisfied by the application. It includes a number of photographs (Appendix A) which will help the Local Review Body to understand more fully, the application site; the property’s setting; and the degree of flood protection already afforded to the site. To assist Members a brief summary is presented here. 161
Page 40
The Application Site The building is: • an important heritage asset; • acknowledged to be a valued feature within a protected landscape; • in need of repair, and on-going maintenance; • next to the applicant’s house; • part of a range, a section of which is in use as a dwelling (applicants house), and another part of which benefits from an extant planning permission for conversion to a house (PKC Ref: 06/01058/MOD) • within a Settlement Boundary for Weem & Boltachan, defined through an up-to-date Development Plan (LDP2); and • the principle of conversion of is supported by policies of that Development Plan. Setting The site is: • within a protected landscape where traditional farm buildings are considered to make a positive visual contribution to the areas character (PKC Landscape Supplementary Planning Guide); • within a fluvial flood area of Low to Medium risk, as defined by SEPA Flood Map; • adjacent to a surface water flood area of Low risk, as defined by SEPA Flood Map; • protected by an existing flood protection scheme (FPS), constructed and maintained by PKC; • extensively hardsurfaced, • immediately adjacent to the Flood pump-house which is designed to move surface waters to the flood plain; SEPA Guidance Relevant guidance identifies that: • within low to medium fluvial flood risk areas, highly vulnerable uses can be supported; • within medium to high fluvial flood risk areas, highly vulnerable uses can be supported on sites within settlement boundaries where the principle of development is supported by an up-to- date Development Plan; • highly vulnerable uses can be supported on sites behind any FPS where the principle of development is supported by an up-to-date Development Plan; 162
Page 41
• flood resilient construction methods should be adopted with flood risk areas. The Development Plan • SEPA were key consultees involved in the production of LDP2, and its settlement strategy. • LDP Policy 52 (Category 2) provides support for development within low to medium flood risk areas provided a suitable freeboard allowance and flood resilient materials are delivered. • The proposals can satisfy a range of planning policy objectives which seek to deliver sustainable development. Those Policies are identified in the Review Statement (Appendix C). Mitigation and Planning Conditions Appropriately worded planning conditions can ensure: • building conversion works are flood resilient; • areas of impervious hard-surfacing are replaced with permeable surfacing; • natural flood management is delivered through the introduction of extensive new planting; • the risks of site flooding are made known to users of the property; • the applicant, as immediate neighbour and site operator, registers with SEPA Flood line for flood alerts; Circular Guidance makes clear that conditions imposed on a grant of planning permission can enable many development proposals to proceed where it would otherwise have been necessary to refuse planning permission. Appropriately worded planning conditions in this case can meet the statutory ‘tests’ and can deliver positive public amenity and economic benefits. Benefits The proposals will: • introduce a viable new use which can preserve an important heritage asset for the long-term; • deliver visual enhancement to place, and a protected landscape; • provide a type of tourist accommodation known to be lacking in the area; • deliver benefits to the local economy through employment and increased visitor spend; • deliver improvements to the local water environment; • reduce flood risk to the wider community (extend flood storage capacity; check flow); • enhance biodiversity at the site. 163
Page 42
Those net gains will meet Development Plan policy objectives through the delivery of sustainable development - the key purpose of planning. Interpreting the Development Plan The Development Plan is required to be interpreted holistically, and Planning Case Law has determined that it does not automatically follow that conflict or tension with a single planning policy, will mean that a development proposal will fail to accord with the Development Plan as a whole. 164
Page 43
Appendix C Development Plan Policies satisfied by the proposals: It is rare that any development proposal will satisfy all relevant policies of an adopted Development Plan. A balanced approach to assessment is required when reaching a planning application decision, entailing a holistic appraisal of the broad sustainable development objectives which underpin the Development Plan. Put simply, refusal can be expected where adverse impacts significantly and demonstrably outweigh the benefits, when assessed against Development Plan policies taken as a whole. In this case, the following Development Plan policies are met: NPF4 (February 2023) Policy 1 Tackling the climate and nature crises: Nature recovery and restoration can be delivered as an integral part of the proposal. Policy 2 Climate mitigation and adaptation: Reuse of an existing redundant building can minimise the loss of greenfield sites and the use of new-build materials. Policy 3 Biodiversity: Removal of hard-surfacing and the delivery of new landscaping can reverse biodiversity loss. Policy 4 Natural Places: Off-site planting in the control of the applicant can restore natural assets and reinforce nature networks. 165
Page 44
Policy 6 Forestry woodland and trees: Increased woodland cover can be delivered on land in the control of the applicant. Policy 7 Historic assets and places: A redundant neglected building, which is a non-designated historic environment asset, will be brought back into use. Policy 9 Restoration and re-use of a vacant building will reduce the need for greenfield development and deliver a positive transformation of place. Policy 12 Zero Waste: The reuse of an existing building will minimise waste and reduce pressure on virgin resources. Policy 14 Design, quality and place: Bringing back into use a redundant building of architectural and historic interest would improve the quality of the area. Policy 22 Flood Risk and water management: The site is protected by an existing formal flood protection scheme; there is no reduction in flood plain capacity as a consequence of the works; and flood resilient materials and construction methods can be used. Development proposals which create, expand or enhance opportunities for natural flood risk management, including blue and green infrastructure, will be supported Policy 29 Rural Development: Conversion of a redundant building will reinforce the viability, sustainability and diversity of the rural economy and support local employment. Policy 30 Tourism: The proposal will facilitate sustainable tourism without giving rise to unacceptable impacts on local amenity or character. LDP2(2020) 6.4 In explaining How to use the Plan, the document confirms the position determined by the Courts, namely that: …… the Plan should be read in its entirety and that individual policies and land allocations do not set out the whole picture for the various types of development. The Vision, Objectives and Spatial Strategy are intended to be as much part of the decision-making process on development proposals as the detailed policies and Supplementary Guidance. 6.5 The Refusal reason asserts that the proposals fail to meet only the requirements of Policy 52 of the LDP2. As a consequence, it concludes the application fails to accord with the Development Plan, despite all other relevant Development Plan policies being satisfied. 6.6 In relation to those other Development Plan Policies, LRB Members are asked to note: Policy 1A: requires positive change to the quality of the built and natural environment, in particular character and amenity – the proposals achieve this objective. 166
Page 45
Policy 1B: sets out a range of placemaking criteria (listed a-j) which must be met. His includes ensuring that existing buildings that contribute to the local townscape are retained and sensitively integrated into new development proposals - the proposals achieve this objective. Policy 6: where settlement boundaries are identified new development should be contained within those defined boundaries- the proposals achieve this objective. Policy 8: Commits to favourable consideration of the establishment of new businesses in rural areas encourages location within existing settlements - the proposals achieve this objective. To find support, any new tourism-related developments should demonstrate they improve the quality of new or existing visitor facilities, allow a new market to be exploited, or extend the tourism season - the proposals achieve this objective. Such a use should be compatible with its location, be satisfactorily accommodated within the landscape and environmental capacity of the site; and not adversely affect the amenities of residential properties nearby - the proposals achieve these objectives. Policy 17: within settlement boundaries, existing new development will be required to safeguard and protect residential amenity; and improve the character and environment of the village – the proposals achieve these objectives. Policy 31: New development should protect and preserve non-designated heritage assets of historic interest as an important part of Scotlands heritage - the proposals achieve this objective. Policy 39: Development should only be permitted within Local Landscape Areas where it will not have a significant adverse impact on their special character or qualities. The individual statements of significance for each LLA should be used to consider their special qualities and potential impacts – the proposals achieve these objectives. Policy 41: Protection and enhancement of both protected and non-protected wildlife, from the impacts of development will be sought – the proposals achieve these objectives. Policy 53: Development proposals should protect and improve the water environment. Within sewered areas foul disposal should be to the public sewerage system; and surface water should be managed by means of sustainable urban drainage - the proposals achieve these objectives. Policy 60: Development proposals should satisfy Transport standards in terms of access; visibility & off-street parking provision - the proposals achieve these objectives. 6.7 It is clear that any perceived tension with LDP Policy 52, is significantly and demonstrably outweighed by the many positive Development Plan policy objectives which are met in this case. 167
Page 46
168
Page 47
169
Page 48
170
Page 49
Page 1 of 3
Mr Ruaraidh Tainsh
c/o George Rollo
Bruadir
Craiglunie Gardens
Moulin
Pitlochry
PH16 5QG
Pullar House
35 Kinnoull Street
PERTH
PH1 5GD
Date of Notice:17th January 2023
TOWN AND COUNTRY PLANNING (SCOTLAND) ACT
Application Reference: 22/01279/FLL
I am directed by the Planning Authority under the Town and Country Planning (Scotland)
Acts currently in force, to refuse your application registered on 28th July 2022 for Planning
Permission for Change of use and alterations to agricultural building and workshop to
form 3 holiday accommodation units Easdale Weem Aberfeldy PH15 2LD
David Littlejohn
Head of Planning and Development
Reasons for Refusal
1. The site is located within an area identified by SEPA as being at medium risk of flooding
(1:200 or 0.5% AEP flood event). Notwithstanding the level of protection that is offered by
the Weem Flood Protection Scheme, the proposed holiday accommodation would increase
the vulnerable classification on the site from a 'least vulnerable use' (agriculture) to a 'highly
vulnerable use' ('solid' walled holiday accommodation), as per SEPA Flood Risk and Land
Use Vulnerability Guidance. The proposal is therefore contrary to the principles and aims of
Policy 52 of the adopted Perth and Kinross Local Development Plan 2 (2019), SEPA
Planning Information Note 4 (PIN4), the Scottish Planning Policy 2014 and Policy 24 of the
emerging National Planning Framework 4 (2023) which all look to protect new land uses
from unacceptable flood risk.
Justification
The proposal is not in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan.
Notes
171Page 50
2 The plans and documents relating to this decision are listed below and are displayed on Perth and Kinross Council’s website at www.pkc.gov.uk “Online Planning Applications” page Plan Reference 01 02 03 04 05 06 07 172
Page 51
4(ii)(b) LRB-2023-16 LRB-2023-16 – 22/01279/FLL – Change of use and alterations to agricultural building and workshop to form 3 holiday accommodation units, Easdale, Weem, Aberfeldy, PH15 2LD PLANNING DECISION NOTICE (included in applicant’s submission, pages 171-172) REPORT OF HANDLING REFERENCE DOCUMENTS 173
Page 52
174
Page 53
REPORT OF HANDLING DELEGATED REPORT Ref No 22/01279/FLL Ward No P4- Highland Due Determination Date 27th September 2022 Draft Report Date 16th January 2023 Report Issued by AMB Date 17 January 2023 PROPOSAL: Change of use and alterations to agricultural building and workshop to form 3 holiday accommodation units LOCATION: Easdale, Weem, Aberfeldy, PH15 2LD SUMMARY: This report recommends refusal of a detailed planning application for the change of use of an existing building at Weem to holiday accommodation as the development is considered to be contrary to the relevant provisions of the Development Plan and there are no material considerations apparent which justify setting aside the Development Plan. BACKGROUND AND DESCRIPTION OF PROPOSAL This planning application seeks to obtain detailed planning permission for the change of use and alterations of an existing, traditional agricultural building into three holiday units. The building is located within the settlement of Weem, at the southern part of the village. Another part of the steading (to the north) has planning consent for the conversion into two dwellings, and one of those dwelling has been formed. The other part (eastern) of the consent remains vacant. In terms of this proposal, the majority of the physical works are internal, but some external works – such as new dormers and replacement / new opening are proposed. SITE HISTORY Detailed planning permission was granted in 2003 (03/01563/FUL) for the change of use and alterations to the principal ‘U’ shaped steading at the roadside to form two housing units, and removal of existing portal frame cattle court to south of existing stone building. That permission was modified slightly via 06/01058/MOD. These permissions relate (insofar as one of the units) to the area of the steading which is subject to the pending planning application, and is to the north of this application. 175
Page 54
Since these approvals where issued, Unit 1 (the western unit) has been implemented but the eastern one remains untouched. In light of this commencement, the permissions remain ‘live’ and Unit 2 could still be implemented (for one dwelling) and is no longer time barred. A detailed planning application (21/01736/FLL) for the change of use and alterations to the agricultural steading to the north of the site to form 2 dwellinghouses was withdrawn prior to determination, due to concerns over the lack of ecological work. That application was essentially for the area covered by the extant planning permission, in relation to the undeveloped approved unit. PRE-APPLICATION CONSULTATION None undertaken. NATIONAL POLICY AND GUIDANCE The Scottish Government expresses its planning policies through The National Planning Framework, the Scottish Planning Policy (SPP), Planning Advice Notes (PAN), Creating Places, Designing Streets, National Roads Development Guide and a series of Circulars. The SPP supports new tourist related development, and also seeks to ensure that new development is not adversely affected by flood risk. It should be noted that whilst this document is current at the present time, this document will however be likely be superseded by the NPF4 in mid- February. National Planning Framework 4 The National Planning Framework 4 (NPF4) was approved by the Scottish Parliament on 11 January 2023. Once adopted by the Scottish Ministers (expected to be 13th February), the NPF4 will have an increased status over previous NPFs and will comprise part of the statutory development plan. At this stage, it is therefore a significant material consideration. In light of this, Policies 22 which relates to flood risk, and Policy 30 which relates to tourism of the NPF4 are relevant to this application. DEVELOPMENT PLAN The Development Plan for the area comprises the TAYplan Strategic Development Plan 2016-2036 and the Perth and Kinross Local Development Plan 2 (2019). It should be noted that adoption, the NFP4 will also form part of the Development Plan. TAYplan Strategic Development Plan 2016 – 2036 - Approved October 2017 Whilst there are no specific policies or strategies directly relevant to this proposal the overall vision of the TAYplan should be noted. The vision states “By 2036 the TAYplan area will be sustainable, more attractive, competitive and vibrant without 176
Page 55
creating an unacceptable burden on our planet. The quality of life will make it a place of first choice where more people choose to live, work, study and visit, and where businesses choose to invest and create jobs.” Perth and Kinross Local Development Plan 2 – Adopted November 2019 The Local Development Plan 2 (LDP2) is the most recent statement of Council policy and is augmented by Supplementary Guidance. The site is located within the settlement of Weem, where the following polices are applicable, Policy 1 – Placemaking Policy 17 – Settlements Policy 31- Other Historic Environmental Assets Policy 41 – Biodiversity Policy 52 – Flood Risk OTHER COUNCIL POLICIES Placemaking Guide 2020 This is the most recent expression of Council policy towards Placemaking Standards. Developer Contributions and Affordable Housing 2020 This is the most recent expression of Council policies towards Developer Contributions. Planning and Nature 2022 This is the most recent guidance in relation to planning and bio-diversity matters. EXTERNAL CONSULTATION RESPONSES Scottish Water have commented on the proposal and raised no objections. INTERNAL COUNCIL COMMENTS Transportation And Development have commented on the proposal and raises no objection in terms of parking or access related matters. Structures And Flooding have objected to the proposal on the ground of flood risk. Biodiversity Officer has commented on the proposal in terms of the bats survey, and has no objections subject to conditions. 177
Page 56
Perth And Kinross Heritage Trust have commented on the proposal and suggested that in the event of any approval being forthcoming, a standard condition is attached. REPRESENTATIONS None received. ADDITIONAL STATEMENTS Screening Opinion EIA Not Required Environmental Impact Assessment (EIA): Environmental Report Not applicable Appropriate Assessment under Habitats Regulations AA Not Required Design Statement or Design and Access Statement Not Required Report on Impact or Potential Impact Not Required APPRAISAL Sections 25 and 37 (2) of the Town and Country Planning (Scotland) Act 1997 require that planning decisions be made in accordance with the development plan unless material considerations indicate otherwise. The Development Plan for the area comprises the approved TAYplan and the adopted LDP2. In terms of other material considerations, consideration of the Council’s SPGs on Placemaking, Developer Contributions, Flooding and Bio-diversity are material considerations. The NPF4 is also now a significant consideration. Policy Appraisal In terms of land use policies, the key policies are found within the LDP2, and the NPF4. Within the LDP2, the site is located within the settlement boundary of Weem where Policies 1 (Placemaking), 17 (settlements) and 52 (flooding) of the LDP2 are all applicable. Policy 1 seeks to ensure that new developments do not have an adverse impact on the areas in which they are located, whilst Policy 17 looks to protect the character and amenity of existing residential areas. Policy 52 looks to ensure that new sites are acceptable from a flood risk point of view, and do not create flooding elsewhere. In terms of the NPF4, Policy 22 (flooding) and 30 (tourism) are applicable. Policy 22 of the NPF4 looks to protect areas and new uses from flooding, whilst Policy 30 generally looks to support new tourism but does look to limit the reuse of existing buildings for STL when there would be an unacceptable impact on the local amenity of character of an area. 178
Page 57
Land Use Acceptably The principle of reusing this building for holiday use is, in isolation from other issues (i.e flooding) perfectly acceptable and aligns with the general feel of the LDP2 and also the emerging NPF4 through Policy 30. Both these documents look to promote tourism developments, when there is no adverse impact on existing areas – which is the case here. In the event of any support being forthcoming for this proposal, standard conditions in relation to holiday use only and associated informative notes concerning STL licencing requirements should be attached to any decision notice. However, the main issue for this proposal in terms of the acceptability of the use proposed (holiday use) is the flooding implications. The same applies to the adjacent application for a proposed residential development. Flooding The key consideration for this proposal is the flooding implications for this proposal. Policy 52 of the LDP2 states that there will be a general presumption against new development which is at risk from flooding. The site lies within the area identified by SEPA’s flood maps as being at medium flood risk (200 year or 0.5% AEP flood event). This proposal looks to change the use of existing agricultural buildings to 3 holiday units, with the other pending application looking to create two residential units. This proposed change of use constitutes an increased vulnerability to flood risk, in terms of with SEPA’s flood risk land vulnerability guidance. The existing agricultural use would be considered to be a ‘least vulnerable use’, whilst a holiday accommodation would be considered as a ‘highly vulnerable’ use. The site does however sit inside the Weem flood protection scheme. The Council constructed the scheme in 2006, which protects the village from the risk of flooding from the River Tay. The scheme was designed to provide a level of protection up to a 100 year (or 1% AEP) flood event. The Council recently carried out a flood protection study for Aberfeldy (completed in June 2019), and the modelling exercise also covered the Weem area. After the assessment, the scheme was considered to still provide a 100-year standard of protection - although any additional ‘freeboard’ has been reduced due to the impacts of climate change. The modelling also highlighted the level of risk behind the defence during a 200 year (or 0.5% AEP) flood event (which is used to define the functional floodplain for planning purposes). New development behind flood defences is something that is generally not supported, with few exceptions and further information on this is provided in SEPA PIN4 guidance - planning-information-note-4-sepa-position-on-development- protected-by-a-flood-protection-scheme.pdf. 179
Page 58
Based on this guidance, new development cannot (should not) be supported unless it is behind a scheme providing the necessary level of protection, or the redevelopment of an existing site does not increase the vulnerability to flood risk. Neither of these are the case here, and additional mitigation measures are not supported by either SEPA guidance, the SPP, the LDP2 of the NPF4. The proposal is therefore contrary to Policy 52 of the LDP2, the SPP and also SEPA guidance. In addition to this, Policy 22 of the NPF4 also states that development proposals at risk of flooding or in a flood risk area will only be supported if they are for (amongst other things) the redevelopment of an existing building or site for a new use which is equal or less vulnerable use than the existing use. As this is not the case here, the proposal is contrary to the principles of Policy 22 of the NPF4. The SEPA PIN guidance is explicitly clear in relation to development behind areas protected by flood prevention schemes and offers no mitigation options. In light of this position, the ultimate recommendation and also the fact that this application was submitted before a distinct change in the triage consultation process between Development Management, it was not considered necessary to consulted SEPA as part of this planning application. In the event of a minded to approve recommendation being advanced at any stage, SEPA should be consulted to ensure that their settled view on this development is known before any approval decision is made Drainage The site is located within a sewered area, so the foul drainage will be connected to the public system. Disposal of surface water will be via soakaways within the curtilage of the building. Both arrangements are considered to be acceptable in this location. Visual Amenity, Design and Layout The main changes to the existing building are new openings and dormer windows. The principle of these is generally acceptable, however in the event of any approval being forthcoming the design of the dormers should be amended via conditions as the ones presented look slightly awkward. Subject to this minor change, and some additional clarification on the proposed roofing repairs, the general appearance of the building upon completion would be acceptable in terms of the impact on the visual amenity of the area. Residential Amenity In terms of the impact on existing residential amenity, the proposal would have limited impact and it is noted that no letters of representation have been received. 180
Page 59
In terms of being able to provide some level of amenity for future users of the holiday accommodation units, a degree of amenity space is being offered which is considered to be acceptable. Roads and Access The proposal raises no issues in terms of road relates matters. Transport Planning have recommended a series of conditions which should be attached to any decision in the event of an approval being forthcoming. Conservation Considerations Whilst not listed or covered by a designation, the existing building is of some architectural note and of interest. The proposed re-use of the building for a long-term use is therefore welcome and in algins with the principles of Policy 31 of the LDP2. In the event of any approval being forthcoming, a standard condition in relation to a standing building survey should be attached to any permission. Natural Heritage and Biodiversity A bat survey has been undertaken, and its recommendations should be adhered to in full. Contaminated Land It is likely that there could be some land contamination with the site, and within the building. In the event of any approval being forthcoming, this should be fully explored. Developer Contributions The proposal is for a holiday development only, which means that the proposal does not attract any requirements for Primary Education contributions or Affordable Housing provision. In terms of Transport related contributions, the site is located outwith the catchment area for these, so these are not required. Economic Impact Approval of the application could have a positive impact on the local economy, albeit a localised one. VARIATION OF APPLICATION UNDER SECTION 32A The application has not been varied. 181
Page 60
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS None required. DIRECTION BY SCOTTISH MINISTERS None applicable to this proposal. CONCLUSION AND REASONS FOR DECISION To conclude, the application must be determined in accordance with the Development Plan unless material considerations indicate otherwise. In this respect, the proposal is considered to be contrary to the Development Plan. Account has been taken of the relevant material considerations and none has been found that would justify overriding the Development Plan. Accordingly the proposal is refused for the reason identified below. 1 The site is located within an area identified by SEPA as being at medium risk of flooding (1:200 or 0.5% AEP flood event). Notwithstanding the level of protection that is offered by the Weem Flood Protection Scheme, the proposed holiday accommodation would increase the vulnerable classification on the site from a ‘least vulnerable use’ (agriculture) to a ‘highly vulnerable use’ (‘solid’ walled holiday accommodation), as per SEPA Flood Risk and Land Use Vulnerability Guidance. The proposal is therefore contrary to the principles and aims of Policy 52 of the adopted Perth and Kinross Local Development Plan 2 (2019), SEPA Planning Information Note 4 (PIN4), the Scottish Planning Policy 2014 and Policy 24 of the emerging National Planning Framework 4 (2023) which all look to protect new land uses from unacceptable flood risk. Justification The proposal is not in accordance with the Development Plan and there are no material reasons which justify departing from the Development Plan. Informatives None, refusal. Procedural Notes Not Applicable. PLANS AND DOCUMENTS RELATING TO THIS DECISION 01 – 07 (inclusive) 182
Page 61
183
Page 62
184
Page 63
185
Page 64
186
Page 65
187
Page 66
188
Page 67
189
Page 68
190
Page 69
191
Page 70
192
Page 71
193
Page 72
194
Page 73
195
Page 74
196
Page 75
197
Page 76
198
Page 77
199
Page 78
200
Page 79
201
Page 80
202
Page 81
203
Page 82
204
Page 83
205
Page 84
206
Page 85
207
Page 86
208
Page 87
209
Page 88
210
Page 89
211
Page 90
212
Page 91
213
Page 92
214
Page 93
4(ii)(c) LRB-2023-16 LRB-2023-16 – 22/01279/FLL – Change of use and alterations to agricultural building and workshop to form 3 holiday accommodation units, Easdale, Weem, Aberfeldy, PH15 2LD REPRESENTATIONS 215
Page 94
216
Page 95
217
Page 96
218
Page 97
219
Page 98
220
Page 99
221
Page 100
222
Page 101
223
Page 102
224
Page 103
225
Page 104
226