Democracy Spraffa

Item 4(i) LRB-2022-05

Perth and Kinross Council · 24 April 2023
Back to Local Review Body — 24 April 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

4(i)
LRB-2023-05
LRB-2023-05
22/01406/FLL – Change of use and alterations to store and
associated attic to form a dwellinghouse, 208b High Street,
Perth, PH1 5PA
INDEX
(a) Papers submitted by the Applicant (Pages 9-350)
(b) Decision Notice (Pages 33-34)
Report of Handling (Pages 35-43)
Reference Documents (Pages 329-330 and 332-342)
(c) Representations (Pages 343-350 and 355-356)
7

Page 2

8

Page 3

4(i)(a)
LRB-2023-05
LRB-2023-05
22/01406/FLL – Change of use and alterations to store and
associated attic to form a dwellinghouse, 208b High Street,
Perth, PH1 5PA
PAPERS SUBMITTED
BY THE
APPLICANT
9

Page 4

10

Page 5

Page 1 of 5
Pullar House 35 Kinnoull Street Perth PH1 5GD  Tel: 01738 475300  Fax: 01738 475310  Email: onlineapps@pkc.gov.uk
Applications cannot be validated until all the necessary documentation has been submitted and the required fee has been paid.
Thank you for completing this application form:
ONLINE REFERENCE 100616551-001
The online reference is the unique reference for your online form only. The  Planning Authority will allocate an Application Number when
your form is validated. Please quote this reference if you need to contact the planning Authority about this application.
Applicant or Agent Details
Are you an applicant or an agent? * (An agent is an architect, consultant or someone else acting
on behalf of the applicant in connection with this application)  Applicant  Agent
Agent Details
Please enter Agent details
Company/Organisation:
Ref. Number: You must enter a Building Name or Number, or both: *
First Name: * Building Name:
Last Name: * Building Number:
Address 1
Telephone Number: * (Street): *
Extension Number: Address 2:
Mobile Number: Town/City: *
Fax Number: Country: *
Postcode: *
Email Address: *
Is the applicant an individual or an organisation/corporate entity? *
  Individual    Organisation/Corporate entity
Gray Planning & Development Ltd
Neil
Gray
Admiralty Park
AYE House
07514278498
KY11 2YW
UK
Dunfermline
Rosyth
neil@grayplanning.co.uk
11

Page 6

Page 2 of 5
Applicant Details
Please enter Applicant details
Title: You must enter a Building Name or Number, or both: *
Other Title: Building Name:
First Name: * Building Number:
Address 1
Last Name: * (Street): *
Company/Organisation Address 2:
Telephone Number: * Town/City: *
Extension Number: Country: *
Mobile Number: Postcode: *
Fax Number:
Email Address: *
Site Address Details
Planning Authority:
Full postal address of the site (including postcode where available):
Address 1: 
Address 2:
Address 3:
Address 4:
Address 5:
Town/City/Settlement:
Post Code:
Please identify/describe the location of the site or sites
Northing Easting
208B HIGH STREET
Perth and Kinross Council
Leonard Street
32
PERTH
PH1 5PA
PH2 8ER
Scotland
723602
Perth
311610
neil@grayplanning.co.uk
The Bathroom Company
12

Page 7

Page 3 of 5
Description of Proposal
Please provide a description of your proposal to which your review relates. The description should be the same as given in the
application form, or as amended with the agreement of the planning authority: *
(Max 500 characters)
Type of Application
What type of application did you submit to the planning authority? *
  Application for planning permission (including householder application but excluding application to work minerals).
  Application for planning permission in principle.
  Further application.
  Application for approval of matters specified in conditions.
What does your review relate to? *
  Refusal Notice.
 Grant of permission with Conditions imposed.
  No decision reached within the prescribed period (two months after validation date or any agreed extension) – deemed refusal.
Statement of reasons for seeking review
You must state in full, why you are a seeking a review of the planning authority’s decision (or failure to make a decision). Your statement
must set out all matters you consider require  to be taken into account in determining your review. If necessary this can be provided as a
separate document in the ‘Supporting Documents’ section: *  (Max 500 characters)
Note: you are unlikely to have a further opportunity to add to your statement of appeal at a later date, so it is essential that you produce
all of the information you want the decision-maker to take into account.
You should not however raise any new matter which was not before the planning authority at the time it decided your application (or at
the time expiry of the period of determination), unless you can demonstrate that the new matter could not have been raised before that
time or that it not being raised before that time is a consequence of exceptional circumstances.
Have you raised any matters which were not before the appointed officer  at the time the  Yes   No
Determination on your application was made? *
If yes, you should explain in the box below, why you are raising the new matter, why it was not raised with the appointed officer before
your application was determined and why you consider it should be considered in your review: * (Max 500 characters)
Change of use and alterations to store and associated attic to form a dwellinghouse
Please refer to attached Grounds for Review Statement and list of documents
13

Page 8

Page 4 of 5
Please provide a list of all supporting documents, materials and evidence which you wish to submit with your notice of review and intend
to rely on in support of your review. You can attach these documents electronically later in the process: * (Max 500 characters)
Application Details
Please provide the application reference no. given to you by your planning
authority for your previous application.
What date was the application submitted to the planning authority? *
What date was the decision issued by the planning authority? *
Review Procedure
The Local Review Body will decide on the procedure to be used to determine your review and may at any time during the review
process require that further information or representations be made to enable them to determine the review. Further information may be
required by one or a combination of procedures, such as: written submissions; the holding of one or more hearing sessions and/or
inspecting the land which is the subject of the review case.
Can this review continue to a conclusion, in your opinion, based on a review of the relevant information provided by yourself and other
parties only,  without any further procedures? For example, written submission, hearing session, site inspection. *
 Yes   No
Please indicate what procedure (or combination of procedures) you think is most appropriate for the handling of your review. You may
select more than one option if you wish the review to be a combination of procedures.
Please select a further procedure *
Please explain in detail in your own words why this further procedure is required and the matters set out in your statement of appeal it
will deal with?  (Max 500 characters)
In the event that the Local Review Body appointed to consider your application decides to inspect the site, in your opinion:
Can the site be clearly seen from a road or public land? *  Yes   No
Is it possible for the site to be accessed safely and without barriers to entry? *  Yes    No
If there are reasons why you think the local Review Body would be unable to undertake an unaccompanied site inspection, please
explain here.  (Max 500 characters)
Please refer to attached List of Appeal Documents
22/01406/FLL
08/11/2022
By means of inspection of the land to which the review relates
The appeal site is partially occluded when viewed from Scott Street car park and completely occluded when viewed at High
Street. The appeal site is accessed via a vennel, which is secured. Internally, the appeal site must be viewed to appreciate the
existing conditions and to visualise the appellants plans to create more daylight and liveable space.
04/08/2022
visual inspection of the appeal site is necessary to better understand the site location and context in terms of its back land
location, the constraints of the site and its form, the existing other land uses and their relationship to the appeal site, and the
arrangements for pedestrian access via the vennel to High Street.  A site visit will enable the Local Review Body to better
understand why the reason for refusal should be reviewed.
14

Page 9

Page 5 of 5
Checklist – Application for Notice of Review
Please complete the following checklist to make sure  you have provided all the necessary information in support of your appeal. Failure
to submit all this  information may result in your appeal  being deemed invalid.
Have you provided the name and address of the applicant?.  *  Yes   No
Have you provided the date and reference number of the application which is the subject of this  Yes   No
review? *
If you are the agent, acting on behalf of the applicant, have you provided details of your name  Yes   No   N/A
and address and indicated whether any notice or correspondence required in connection with the
review should be sent to you or the applicant? *
Have you provided a statement setting out your reasons for requiring a review and by what  Yes   No
procedure (or combination of procedures) you wish the review to be conducted? *
Note: You must state, in full, why you are seeking a review on your application. Your statement must set out all matters you consider
require to be taken into account in determining your review. You may not have a further opportunity to add to your statement of review
at a later date. It is therefore essential that you submit with your notice of review, all necessary information and evidence that you rely
on and wish the Local Review Body to consider as part of your review.
Please attach a copy of all documents, material and evidence which you intend to rely on  Yes   No
(e.g. plans and Drawings) which are now the subject of this review *
Note: Where the review relates to a further application e.g. renewal of planning permission or modification, variation or removal of a
planning condition or where it relates to an application for approval of matters specified in conditions, it is advisable to provide the
application reference number, approved plans and decision notice (if any) from the earlier consent.
Declare – Notice of Review
I/We the applicant/agent certify that this is an application for review on the grounds stated.
Declaration Name: Mr Neil Gray
Declaration Date: 06/02/2023
15

Page 10

16

Page 11

Gray Planning & Development Limited, Town Planning Consultants. Company No. SC568143
Member of the Royal Town Planning Institute No. 42566
W: www.grayplanning.co.uk
Personal  |  Professional  |  Proactive  |  Commercial  |  Results
THE BATHROOM COMPANY
GROUNDS FOR REVIEW OF A PLANNING DECISION
CHANGE OF USE AND ALTERATIONS TO STORE AND
ASSOCIATED ATTIC TO FORM A DWELLINGHOUSE
208B HIGH STREET, PERTH, PH1 5PA
(PLANNING REF: 22/01406/FLL)
Online E-planning ref: 100616551-001
February 2023
Our Ref: 2022_92
17

Page 12

1              
The Bathroom Company
Contents
1 INTRODUCTION ................................................................................ 2
2 THE APPEAL SITE AND PROPOSALS ........................................... 4
3 GROUNDS FOR REVIEW .................................................................. 6
4 CONCLUSIONS ................................................................................. 13 
Appendices 
The following documents are referred to in this Grounds for Review Statement. 
All such documents have been electronically uploaded to the ePlanning.Scot online portal.   
Document GP01 – Decision Notice Application Ref: 22/01406/FLL dated 08.11.22.
Document GP02 – Report of Handling of Planning Application 22/01406/FLL
Document GP03 – Photographic record of existing situation
Document GP04 – Photographic record of proposed living space
Document GP05 – Edinburgh Design Guidance (2020)
Document GP06 – Perth and Kinross Council Placemaking Guidance (2020)
Document GP07 -  Precedent Case 21_00318_FLL-DECISION_NOTICE-1614922 
Full Planning application drawings and sections, application form, landowner certification all as submitted
for planning approval. 
18

Page 13

2              
The Bathroom Company
1 INTRODUCTION
THE PROPOSED DEVELOPMENT AND REASONS FOR REFUSAL 
1.1 These are Grounds for Review of a decision to refuse planning permission for the change of
use and alterations to a store and associated attic to form a dwellinghouse. The appeal
property at 208B High Street, Perth is located to the rear of the street-fronting 3 storey
building (ground floor occupants Nationwide Building Society) and to the north of Scott Street
car park. Here, a two-and-a-half storey building partially occludes the appeal site, which is a
single storey structure which forms much of the appeal site, along with access along a gated
vennel and pend to High Street. Broadly the site is in a back land position.
1.2 The property lies in the Conservation Area. Various other parts of the property at 208 High
Street have been successfully converted over the years to form city centre living
accommodation. This matter will be discussed in this appeal. 
1.3 The Review request is submitted under Section 43A of the Town and Country Planning
(Scotland) Act 1997 (as amended 2006). The Notice of Review has been lodged within the
prescribed three-month period from the refusal of planning permission dated 8th November
2022 (Appeal Document GP01).
1.4 By Delegated Powers, the Head of Planning and Development of Perth and Kinross Council
decided to refuse the application, as recommended by a Planning Officer in the Report of
Handling (Appeal Document GP02). The single reason for refusal is per the Decision Notice
(Appeal Document GP01), which states:
1. The proposed dwellinghouse, by virtue of its constrained back-land location and poor
internal design, would fail to contribute positively to the quality of the surrounding built
environment. It would fail to create a coherent structure of spaces and buildings, or a safe,
accessible, and easily navigable place for future occupiers and visitors. 
Approval would therefore be contrary to Policies 1A and 1B(a)(d)(e) of the Perth and
Kinross Local Development Plan 2 (2019) and Placemaking Supplementary Guidance
(2020). 
PROPOSED PROCEDURE TO BE FOLLOWED IN DECIDING THE REVIEW
1.5 We recommend the Local Review Body undertakes a site visit (accompanied) and considers
further written representations in deciding the case. 
1.6 With respect to the single reason for refusal, visual inspection of the appeal site is necessary
to better understand the site location and context in terms of its back land location, the
constraints of the site and its form, the existing other land uses and their relationship to the
appeal site, and the arrangements for pedestrian access via the vennel to High Street. A site
visit will enable the Local Review Body to better understand why the reason for refusal should
be reviewed.
19

Page 14

3              
The Bathroom Company
 The proposed dwelling would be formed in the southernmost portion of the single storey
structure – visual inspection would allow Local Review Body to see the intricacies of the
arrangement of buildings and spaces (Reason 1).
 Visual inspection of the neighbourhood will confirm there are several other vennels and
tight city centre locations where conversion of vacant or under utilised buildings have
successfully happened (Reason 1).
 The appeal site is partially occluded when viewed from Scott Street car park and
completely occluded when viewed at High Street. The appeal site is accessed via a vennel,
which is secured. Internally, the appeal site must be viewed to appreciate the existing
conditions and to visualise the appellants plans to create more daylight and liveable space.
20

Page 15

4              
The Bathroom Company
2 THE APPEAL SITE AND PROPOSALS 
2.1 Full details of the planning application site, detailed site layout, technical land use
considerations are contained in the planning application. 
2.2 The proposal is to make internal and external alterations to change the use of an existing
ground floor store and attic to form a single dwellinghouse with one bedroom. The external
works include the replacement of existing east and west fenestration, the addition of three
east-facing roof windows and one west-facing roof extension. 
2.3 The existing situation is an attic store in the upper level which is vacant and is fully enclosed
without any daylight penetration. In the lower level, there is an existing kitchen with store and a
hallway with WC. 
2.4 To assist in visualizing the existing situation, the appellants have provided photographs for this
appeal (see appeal document GP03). These are summarized below with comments:
Photo  Description Comment
1 Existing pend leading
to appeal site. 
Is not darkened or concealed. Can be improved by lighting
and fencing (see proposals)
2 Amenity area to front
door
Has potential to provide outdoor amenity space (see
proposals)
3 Front door entry Has potential to provide an open plan space for living (see
proposals)
4, 5
and 6
Internal views of
existing 
Note existing windows, providing existing light penetration.
Appeal proposals include for further light penetration
through skylight and new openings. 
2.5 The initial submitted plans showed provision for:
 New dormer with windows and a new roof light to introduce daylight into the upper attic
space to form bedroom accommodation.
 New windows and new glazed front door, on ground level to form enhanced living space
and introduce further daylight into the ground level.
 To improve energy efficiency and modernisation of the existing property’s heating and
insulation performance, a new insulated concrete floor with damp proof membrane along
with new thermal stud walls, was proposed.
 An existing opening from the appeal property to an adjacent residential property would be
blocked up and a new separating wall would be erected.
2.6 On initial review of the submitted plans, the planning authority requested revisions to these to
provide further enhancements. These included (and are shown in the refused planning
drawings as Version A) as follows:
 Addition of further 2no. roof lights to the existing attic space
 A gallery room has been formed at the upper level. 
21

Page 16

5              
The Bathroom Company
2.7 No parking or cycle provision is proposed. The proposal is compliant with the town centre
location and the lack of provision is not a matter in this case, as discussed later.
2.8 The external vennel and amenity area is proposed to be improved and enhanced, as shown in
the proposed development photographs, see appeal document GP04. This shows proposals
for replacement of the existing timber fence with a modern, green-walled boundary fence and
string-lighting. The appellants are also showing in GP04 potential for an external seating area. 
2.9 Following the requested revisions, internally, the proposal is for one bedroom, with adjacent
shower and WC and gallery in the upper part of the converted property. This would be
reached by a new internal staircase. On the lower level of the converted property would be an
open plan living space (seating, TV) and kitchen / dining space. The photographs provided in
GP04 show the very high-quality detailing proposed to all new cabinets, worktops, WC and
showering and kitchen fittings. 
2.10 In total 3no. rooflight windows, a new dormer window, and a new ground level window with
glazed front door would be provided (making the fenestration a particularly strong
enhancement to the conversion of the property) – not only adding new visual architectural
form to the external appearance of the property but most importantly flooding significantly
more daylight into the converted property. That effect is discussed later in this Statement. 
2.11 Details of the site and its design and finish is found in the drawings which were submitted for
the planning application, as follows:
 Existing Elevations and Floor Plan (Drawing 01)
 Proposed Floor Plan, Roof Plan, Sections and Elevations (Drawing 10). Note there was a
revision to this drawing, with Version A refused/
 Detail of window and glazed door detail (dimensions, specifications)
 Detail of velux window specifications 
22

Page 17

6              
The Bathroom Company
3 GROUNDS FOR REVIEW
3.1 Section 1 set out the Planning Authority’s single reason for refusal. Based on the evidence
presented in this appeal, the appellant contends that reason can be set aside, and planning
permission can be granted for the proposed development. This is subject to the imposition of
relevant, enforceable planning conditions. 
3.2 This section will argue the following Grounds:
1. The location is back-land as the planning authority states a fact. However, it will be
demonstrated that the location it is not constrained. It will also be demonstrated that there
are other city centre back land property conversions which are positively bringing vacant or
under utilised property into residential use, which is assisting the Council to revitalise and
regenerate the city centre. The proposal is not contrary to Policies 1A and 1B(a)(d)(e) of the
Perth and Kinross Local Development Plan 2 (2019) and Placemaking Supplementary
Guidance (2020). 
2. The internal living design is not poor as claimed. The introduction of significant daylight
penetration by use of new and improved fenestration makes a significant enhancement to
living conditions. The proposal is not contrary to Policies 1A and 1B(a)(d)(e) of the Perth
and Kinross Local Development Plan 2 (2019) and Placemaking Supplementary Guidance
(2020). 
3. The proposal does not fail to create a coherent structure of space and buildings. The
architect’s thoughtful attention to the above fenestration, coupled with formation of new
internal living spaces is suitable to accommodate a single or couple in this one bedroom
proposed conversion. This type of accommodation is likely to appeal to first-time buyers,
young people, students or professionals seeking close proximity to the city centre and its
amenities. The proposal is not contrary to Policies 1A and 1B(a)(d)(e) of the Perth and
Kinross Local Development Plan 2 (2019) and Placemaking Supplementary Guidance
(2020). 
4. The proposal does propose a safe, accessible and easily navigable place – the external
spaces are considerably enhanced through refreshed boundary treatment, new lighting and
more welcoming glazed front door and new fenestration. The proposal is not contrary to
Policies 1A and 1B(a)(d)(e) of the Perth and Kinross Local Development Plan 2 (2019) and
Placemaking Supplementary Guidance (2020). 
3.3 Each of these points is expanded in the paragraphs below, with evidence presented and
justification given to support the appellants case that planning permission should be granted. 
3.4 Since refusal of planning permission as issued on 8th November 2022, the Scottish Parliament
has since approved National Planning Framework 4 (NPF 4) which is a sea-change in
development planning policy and legal terms. From 12th February 2023, NPF 4 will be part of
the development plan, where all planning decisions must be based on. Therefore NPF4 forms
a significant new policy framework which is also discussed in this Statement.
23

Page 18

7              
The Bathroom Company
3.5 Not only do the proposals meet the provisions of the Development Plan, there are also
material considerations which are relevant, add weight to and support the appellants case.
These material considerations include:
 Other planning permissions granted for similar city centre conversions of vacant or under
utilised buildings for residential use
 City centre space living standards, for one bedroom studio accommodation, Edinburgh
examples. 
1 – BACKLAND LOCATION, NOT CONSTRAINED 
3.6 The planning authority’s reason for refusal is the proposed design, siting and ‘lack of
landscaping’ does not respect the character and amenity of the place.
3.7 The Planning Officer’s Report of Handling (appeal Doc GP02) outlines his thinking referring to
the PKC Local Development Plan and Placemaking Guidance. “Policy 1A – Placemaking
states that development must contribute positively to the quality of the surrounding built and
natural environment. Policy 1B identifies ten placemaking criteria which all development
proposals should meet. Of particular relevance to this site is criteria (a) “create a sense of
identity by developing a coherent structure of streets, spaces, and buildings, safely accessible
from its surroundings”; (d) “access, uses and orientation of principal elevations should
reinforce the street or open space”; and (e) “all buildings , streets and spaces should create
safe, accessible, inclusive places for people, which are easily navigable, particularly on foot,
bicycle and public transport”.”
3.8 The planning officer places emphasis on the “surrounding built and natural environment” –
however it is a fact that the location comprises a back land development by virtue of its
location. By its historical nature, and urban compact form, the property is constrained found to
the rear of High Street and ‘sandwiched’ between the 3-storey building to its north and a 2-
storey building to its south, including Scott Street public car park. However this characteristic
is symptomatic of many other town centre situations particularly in the historic core. The
surrounding built environment is dense, compact and not spacious. However this itself
contributes to the character of the place, particularly as designated a conservation area.
3.9 Placemaking Supplementary Guidance states that “Backland development consisting of one
or more dwellings situated immediately behind one another is generally unsatisfactory in any
location, but particularly when sited on modest sized plots or sharing a single access due to
associated problems with: overlooking; noise and light disturbance; general loss of amenity;
and adverse impact on the character of the area.” The Report of Handling (GP05) refers to
how the applicant’s agent explored alternative access options (e.g. entering the site via Scott
Street car park, which it is said is better lit, overlooked. These matters are discussed further
under the fourth Ground argued at paragraph 3.23 (safe, accessible and easy navigable
space). This evidences that the agents tried to offer a solution, in recognition of the site
constraints. 
3.10 However the Report of Handling reads under Page 6 of GP05, stating “Officers consider that
had the application site incorporated the structures immediately to the north and south, that a
24

Page 19

8              
The Bathroom Company
better quality of design could have been achieved in terms of approach, internal quality and
perhaps even private amenity space. In other words, the highly constrained nature of the
current application site mean that any design solution would struggle to meet Placemaking
criteria. To this end, officers have suggested an enlargement of the property to the south
within the applicant’s ownership”. This narrative suggests the planning officer came to a
position which the applicants did not wish to propose as the planning application site as
defined in the planning red line boundary did not include the additional land referred to. The
Planning Officer should not have been clouded in their fair assessment of the proposals before
them with suggesting other options which the appellant did not wish to pursue for other
reasons. 
3.11 The Planning Officer has taken a narrow view on the proposal’s compatibility with Policy 1A
Placemaking. For example other positive aspects of the proposal which meet Policy 1A which
says how new proposals “should create and improve links within and, where practical, beyond
the site“ – the appellants are proposing a considerable improvement to the pedestrian linkage
between the High Street access point, via a narrow vennel. In its existing form it is dark, has
limited daylight and navigable via stores, uneven surfaces. However the proposal is to
considerably tidy this up, replace the existing timber boundary fence with a new ‘green’
planted and planter fence, lights and generally make the passage way more welcoming and
enhanced. This improves the link within the site, to High Street and this fact has been over
looked in the officer’s argument about site constraints. The appellant has identified this
weakness and proposes a positive improvement. 
3.12 The planning officer has been silent on the significant positive improvements the development
can bring to this back land location, which meets LDP Policy 3: Perth City, which states “The
Council will work with developers and landowners to assist with site assembly to facilitate the
development of underutilised land and buildings and/or to assist in the delivery of social and
environmental benefits.”
3.13 Using our emphasis underlined, the appeal proposal does develop under utilised land and
buildings in the city centre and it does assist in the delivery of social and environmental
benefits. It would improve the visual appearance, improve lighting and safety, improve social
conditions by new housing opportunity in the city centre.
3.14 It can also be argued the proposal is compliant with Policy 10 ‘City, Town and Neighbourhood
Centres’. This policy seeks to ensure that changes away from town centre uses are resisted
unless there is demonstratable market evidence that the existing use is no longer viable.
Policy 10 primarily is concerned with the ground floor of each building ensuring that there is a
vibrancy at street level. In this instance, the unit under question is found on the ground and
upper floor of the building and is not directly on the High Street itself. Policy 10 allows for
upper floors of buildings to be converted to residential where the building is currently under-
utilised and the proposed use as residential is compatible with surrounding uses. The building
at present is only used for storage and is considered to be under utilised in this town centre
location. It’s change to housing will therefore provide a use which utilises the building to its full
potential without detracting from the qualities of the town centre. The use as residential is also
compatible with neighbouring uses where there is already some residential uses present. It is
therefore considered that there are no concerns with the proposed use in this location.
25

Page 20

9              
The Bathroom Company
3.15 There are other noted cases of city centre back land property conversions. Perth and Kinross
Council approved an identical proposal  - the conversion of a store to a single dwelling (one
bedroom) to a back land property in the conservation area, of Crieff High Street. The
application reference 18/00471/FLL, which was renewed successfully in 2021 (planning ref
21_00318_FLL) document ref GP07. In the planning officer’s report of handling for the Crieff
High Street case, the officer indicated no concerns about design and placemaking, for a one
bedroom conversion, and he did not state any concern about the location or back land
position of this property. The property also lying in the conservation area, the officer had no
concerns about the impact of development on this policy.
3.16 The planning officer has been silent on the positive effects the proposal would have on
revitalisation of the city centre. NPF 4 (as discussed at Paragraph 3.4) is relevant in this
argument. Policy 27 of NPF 4 states “a) Development proposals that enhance and improve the
vitality and viability of city, town and local centres, including proposals that increase the mix of
uses, will be supported”. Bringing resident use back into the city centre will enhance and
improve the vitality and viability of the city centre.
3.17 The proposal is not contrary to Policies 1A and 1B(a)(d)(e) of the Perth and Kinross Local
Development Plan 2 (2019) and Placemaking Supplementary Guidance (2020). 
2 – INTERNAL LIVING SPACE
3.18 The single reason for refusal claims the internal living space design is poor. 
3.19 The Planning Officer’s Report of Handling (document GP05) states the following:
“In terms of the internal layout and quality of the proposal, the only vertical window which
would serve the proposed ground floor kitchen/living space would look directly at a
neighbouring building across a narrow gap of just 0.73 metres in width. The window has an
internal reveal depth of 0.90 metres, and as such the amount of natural light reaching the
kitchen/living area from this window would be extremely limited. It was only after the planning
case officer queried the lack of natural light reaching the ground floor that revised drawings
were submitted showing a first floor gallery with two additional roof windows intended to serve
both the bedroom and kitchen/living space below. A proposed door between this space and
the entrance hallway was also re-annotated as being “glazed” in revised drawings. Whilst
these revisions have improved matters, the proposed ground floor space would still be rather
dark and overly reliant on artificial lighting during daylight hours.
The proposed first floor bedroom would be better lit by virtue of the introduction of a west-
facing roof extension, albeit with an underwhelming outlook across the adjacent private car
park.
The provision of an accessible WC appears to make use of a space defined by the existing
structural layout of the building, but is somewhat undermined by the fact that the proposed
bedroom can only be accessed via staircase.”
3.20 The planning officer is concerned about the limited natural light penetration via the kitchen
window. However the proposal offers considerable additional new light penetration via three
26

Page 21

10              
The Bathroom Company
new upper level windows (sky lights and dormer windows).  The architects did respond
positively to the planning officers stated concerns and they have proposed an innovative way
to flood more light into the spaces. The internal spaces are open plan, at upper and lower
level. Therefore the natural light is likely to be more evenly spread through the building, as
opposed to a building which has rooms and enclosed spaces. Therefore the appellants
disagree that the introduction of the new window openings (which are only practical for
installation in the upper level) can provide adequate light penetration through the both levels
of the building. 
3.21 The planning officer has unenthusiastically acknowledged how “these revisions improved
matters” but his comment that the ground level space would still be “rather dark” is a matter
of subjective taste. The target market for the new home, is to be for first time buyer, young
couple or single professionals. It is the appellants belief that the property will have sufficient
daylight rather than relying on owners/tenants that may not habitat the property so often in
daytime. The provision of artificial lighting is carefully designed as the images shown in the
appeal document GP04 show, the proposed scheme is very well appointed and extremely
positively lit.
3.22 There is a considerable introduction of daylight penetration by use of new and improved
fenestration. The planning officer has opined that a west facing roof extension could offer a
solution to better improve lighting. However this is not the proposal the appellants have
submitted, and it is not their intention to vary the plans. The outlook provided across the Scott
Street car park is not unreasonable of many city centre locations particularly in higher density
locations. This applies to Perth but also to other urban locations because of the nature of their
surroundings. 
3.23 The final comment by the planning officer on the use of existing structural conditions misses
the point that the architects have devised a workable solution in the staircase, to overcome
constraints within the internal space. This has not been credited in the planning officer’s
review of the case.
3.24 The proposal is not contrary to Policies 1A and 1B(a)(d)(e) of the Perth and Kinross Local
Development Plan 2 (2019) and Placemaking Supplementary Guidance (2020). 
3 – SPACE AND BUILDINGS COHERENCE – CITY CENTRE LIVING
3.25 The single reason for refusal opines the proposal fails to create a coherent structure of space
and buildings. The appellants contend that the conversion of an attic and store building, which
currently lies vacant and under utilised, can provide suitable residential accommodation in the
form of a Studio. A Studio is defined as a one bedroom accommodation, with open plan
kitchen and living space and a bedroom with en suite shower and WC. Whilst minimal in
number of rooms, the space is practical and entirely suitable. 
3.26 The City of Edinburgh Council positively encourages city centre living in small residential units,
such as a studio. The Council’s Design Guide (2020) (see Appeal Document GP05) states “In
order to ensure satisfactory amenity, dwellings should not fall below the following minimum
27

Page 22

11              
The Bathroom Company
internal floor areas: 36 sq m ‘Studio dwelling’.  The appeal proposal is measuring 37 sq m,
which just matches the Edinburgh guidelines. The Edinburgh guidance also states “The
minimum floor area for studios is lower than that for one bedroom flats since the relatively
larger single open plan space found in studios compensates for having a smaller space
overall. It is expected that studios will be designed to be very space efficient. Imaginative
solutions are encouraged for storage, the location of the bed and so on”.
3.27 Review of the proposed layout indicates that the spaces are single open plan spaces. There is
a kitchen and living space open plan on the ground level and a bedroom and WC/shower with
gallery on the upper level. The studio is very well designed to be very space efficient. The
architects have applied imaginative solutions including the upper level gallery and storage
space. The architect drawings also show consideration for the head room available to
occupants for bedroom. Whilst the existing room spaces are constrained owing to main truss
and beams overhead, this can be overcome by the imaginative use and location of the stair to
upper level; and the use of the skylight windows to open up and penetrate daylight into the
upper level is extremely effective. 
3.28 National Planning Framework 4 (NPF4) Policy 15 supports development that is consistent with
the principles of local living and 20 minute neighbourhoods, helping to ensure our homes and
wider neighbourhoods meet all of our needs. As part of this, it recognises that affordable
housing options, ability to age in place and housing diversity are an integral part of more
liveable places. The proposed development is small scale, may be quite unusual given its
scale and constrained location, however the appellants contend that this is part of the charm
of offering such accommodation at a city centre location. It is feasible that the new home
would be an excellent start home or studio home for young professionals seeking city living in
a compact town centre as Perth. 
3.29 National Planning Framework 4 (NPF4) Policy 14 is also relevant to the appeal. It states “a)
Development proposals will be designed to improve the quality of an area whether in urban or
rural locations and regardless of scale.” The appeal proposal is suitable to improve the quality
of the area and is an opportunity for such despite its small scale, it makes a positive
contribution.
3.30 The appeal proposal meets LDP Policy 1 Placemaking, it does respect the existing building
lines. The proposal also does retain the street or open space. Therefore it is unclear why the
Planning Authority has said in its reason for refusal why the proposal fails on part d) of Policy
1A.
3.31 The proposal is not contrary to Policies 1A and 1B(a)(d)(e) of the Perth and Kinross Local
Development Plan 2 (2019) and Placemaking Supplementary Guidance (2020). 
4– SAFE, ACCESSIBLE AND NAVIGABLE PLACE
3.32 The single reason for refusal claims the accommodation does not provide safe, accessible or
easily navigable place. 
28

Page 23

12              
The Bathroom Company
3.33 The Planning Officer has opined that the proposal fails to comply with part (e) of Policy 1A.
However the appellant argues that the appeal proposal does create safe, accessible, inclusive
place for people, which is easily navigable, particularly on foot, bicycle and public transport
because of its central location and accessible passageway. The design proposals will
significantly enhance safety and security in the surroundings and will transform this existing
visual appearance. 
3.34 The proposal is not contrary to Policies 1A and 1B(a)(d)(e) of the Perth and Kinross Local
Development Plan 2 (2019) and Placemaking Supplementary Guidance (2020).
29

Page 24

13              
The Bathroom Company
4 CONCLUSIONS
4.1 This Grounds for Review statement sets out the appellants case, that the one reason for
refusal can be set aside, and planning permission should be granted. This is because:
 Despite being a back land location in a city centre, which is broadly supported by the
Council’s planning policies and placemaking guidance, the appellants have demonstrated
that new residential accommodation can be provided particularly of the type which would
attract young people, first time buyers or single / couple professionals who are seeking city
centre living. 
 The Council’s city centre planning policies such as Town Centres First Policy X is therefore
carries weight in the decision making, given that the proposed change of use is to help
encourage movement back into city centres and revitalise these in a period of considerable
decline across Scotland.  
 Perth has a fantastic opportunity to match the modern city living aspects seen elsewhere
such as Edinburgh or Dundee. Their planning policies encourage studio/ apartment floor
layouts which are comparable to the appeal case.
 Contrary to the planning officer’s view, the internal living space is suitable and does offer a
type of accommodation which is lacking in the city centre and would appeal to young
people or first time buyers. The improvements to the design, version A with more
fenestration and deeper penetration of daylight is successful.
 Contrary to the planning officer’s view, the proposal does create a coherent structure of
space and buildings. The benefit of a site visit will clarify and confirm the enhancements
proposed will make a positive contribution to city centre living. 
 The proposal does propose a safe, accessible, and easily navigable place.
 On the grounds of these matters, the appeal does satisfy Policies 1A and 1B(a)(d)(e) of the
Perth and Kinross Local Development Plan 2 (2019) and Placemaking Supplementary
Guidance (2020). 
 With regard to other material considerations, it has been demonstrated that there are other
precedent cases for granting planning permission for one bedroom residential in converted
vacant buildings in city centre locations. 
 It has also been demonstrated that other planning authorities such as City of Edinburgh
Council positively encourage studio or apartment living in smaller spaces which are equally
able to provide suitable living accommodation to the target market. 
 There were no objections to the proposals from any neighbours, nor any concerns raised
by stakeholders consulted by the planning authority.   
4.2 It is respectfully requested therefore that the Local Review Body reconsider the proposals and
find favour with the arguments set out in this Review and grant planning permission. 
30

Page 25

PLANNING APPEAL – ONLINE REFERENCE 100190819 -003
CHANGE OF USE AND ALTERATIONS TO STORE AND ASSOCIATED ATTIC TO FORM A
DWELLINGHOUSE 
208B HIGH STREET, PERTH, PH1 5PA 
(PLANNING REF: 22/01406/FLL)
LIST OF DOCUMENTS FOR APPEAL
The following documents are relied upon to support the appeal case:  
Please note other documents such as Local Development Plan, Supplementary Planning Guidance,
Advice Notes, Scottish Government policy and guidance are not reproduced. We have assumed, at
this stage, Perth and Kinross Council can provide these if necessary.   
Appeal Document GP01 – Decision Notice Application Ref: 22/01406/FLL dated 08.11.22
Appeal Document GP02 – Report of Handling of Planning Application 22/01406/FLL
Appeal Document GP03 – Photographic record of existing situation
Appeal Document GP04  - Photographic record of proposed living space
Appeal Document GP05 – Edinburgh Design Guidance (2020)
Appeal Document GP06 – Perth and Kinross Council Placemaking Guidance (2020)
Appeal Document GP07 -  Precedent Case 21_00318_FLL-DECISION_NOTICE-1614922
Full Planning application drawings and sections, application form, landowner certification all as
submitted for planning approval 22/01406/FLL.
31

Page 26

32

Page 27

Page 1 of 3 
The Bathroom Company
c/o Muir Walker And Pride
Mercat House
1 Church Street
St Andrews
KY16 9NW 
Pullar House
35 Kinnoull Street
PERTH  
PH1  5GD 
Date of Notice:8th November 2022 
TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 
Application Reference: 22/01406/FLL 
I am directed by the Planning Authority under the Town and Country Planning (Scotland)
Acts currently in force, to refuse your application registered on 19th August 2022 for
Planning Permission for Change of use and alterations to store and associated attic to
form a dwellinghouse 208B High Street Perth PH1 5PA   
David Littlejohn
Head of Planning and Development 
Reasons for Refusal 
1.   The proposed dwellinghouse, by virtue of its constrained back-land location and poor
internal design, would fail to contribute positively to the quality of the surrounding built
environment. It would fail to create a coherent structure of spaces and buildings, or a
safe, accessible and easily navigable place for future occupiers and visitors. 
Approval would therefore be contrary to Policies 1A and 1B(a)(d)(e) of the Perth and
Kinross Local Development Plan 2 (2019) and Placemaking Supplementary Guidance
(2020). 
Justification 
The proposal is not in accordance with the Development Plan and there are no
material reasons which justify departing from the Development Plan. 
33

Page 28

2
The plans and documents relating to this decision are listed below and are
displayed on Perth and Kinross Council’s website at www.pkc.gov.uk “Online
Planning Applications” page 
Plan Reference 
02 
04 
05 
06 
07 
34

Page 29

1 
REPORT OF HANDLING 
DELEGATED REPORT 
Ref No 22/01406/FLL
Ward No P12- Perth City Centre
Due Determination Date 18th October 2022 Extended to 28th October 2022
Draft Report Date 31st October 2022
Report Issued by John Cooney Date 1st November 2022 
PROPOSAL: Change of use and alterations to store and associated attic
to form a dwellinghouse    
LOCATION:  208B High Street Perth PH1 5PA  
SUMMARY: 
This report recommends refusal of the application as the development is
considered to be contrary to the relevant provisions of the Development Plan.
There there are no material considerations apparent which justify setting aside
the Development Plan. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
The application property comprises land at the rear of 204-208 High Street,
Perth, which is within the Perth Central Conservation Area and City Centre
Secondary Uses Area. The immediate context includes the three-storey
street-fronting building to the north, a two and a half storey building to the
south which fronts the Scott Street car park, and a central single storey
structure with double pitched roof which links these two taller buildings. It is
the southernmost portion of this single storey structure which forms the
substantive part of the application site, along with access along a gated
vennel and pend to High Street. There is a separate gated pend beneath the
two-storey southern building, but which is outwith the application site
boundary but within the applicant’s ownership. All of the buildings mentioned
above appear to pre-date the creation of the adjacent public and private car
parks in the mid-20th century and were once part of a burgage plot which
extended much further south than is currently the case. In other words, the
existing built form pre-dates existing planning policies and placemaking
guidance. 
The site is bounded to the east by 200-202 High Street with a narrow gap
separating the application building from its neighbour. To the west is 210-212
High Street, and a private car park separated by a corrugated iron boundary
treatment. 
35

Page 30

2 
The proposal is for a change of use and internal and external alterations of the
existing ground floor store and attic to form a single dwellinghouse with one
bedroom. The external works include the replacement of existing east and
west fenestration, the addition of three east-facing roof windows and one
west-facing roof extension. 
SITE HISTORY 
11/01593/FLL Conversion of attic space to form a one bedroom
apartment (at building fronting High Street)
10 November 2011 - Application Approved 
02/00276/FUL  Alterations and change of use of offices to 2 flats
(at building fronting High Street)
5 April 2002 - Application Approved 
PRE-APPLICATION CONSULTATION 
None 
NATIONAL POLICY AND GUIDANCE 
The Scottish Government expresses its planning policies through The
National Planning Framework, the Scottish Planning Policy (SPP), Planning
Advice Notes (PAN), Creating Places, Designing Streets, National Roads
Development Guide and a series of Circulars.   
DEVELOPMENT PLAN 
The Development Plan for the area comprises the TAYplan Strategic
Development Plan 2016-2036 and the Perth and Kinross Local Development
Plan 2 (2019). 
TAYplan Strategic Development Plan 2016 – 2036 - Approved October
2017 
Whilst there are no specific policies or strategies directly relevant to this
proposal the overall vision of the TAYplan should be noted.  The vision states
“By 2036 the TAYplan area will be sustainable, more attractive, competitive
and vibrant without creating an unacceptable burden on our planet. The
quality of life will make it a place of first choice where more people choose to
live, work, study and visit, and where businesses choose to invest and create
jobs.” 
Perth and Kinross Local Development Plan 2 – Adopted November 2019 
The Local Development Plan 2 (LDP2) is the most recent statement of
Council policy and is augmented by Supplementary Guidance. 
The principal policies are:
36

Page 31

3 
Policy 1A: Placemaking  
Policy 1B: Placemaking  
Policy 3: Perth City  
Policy 5: Infrastructure Contributions  
Policy 11: Perth City Centre Secondary Uses Area
Policy 14B: Open Space Retention and Provision: Open Space within New
Developments
Policy 28A: Conservation Areas:  New Development
Policy 32: Embedding Low & Zero Carbon Generating Technologies in New
Development
Policy 52: New Development and Flooding  
Policy 53A: Water Environment and Drainage: Water Environment
Policy 53B: Water Environment and Drainage: Foul Drainage
Policy 53C: Water Environment and Drainage: Surface Water Drainage
Policy 53E: Water Environment and Drainage: Water Supply
Policy 56: Noise Pollution  
Policy 60B: Transport Standards and Accessibility Requirements: New
Development Proposals 
OTHER POLICIES 
Placemaking Supplementary Guidance
Developer Contributions Supplementary Guidance 
CONSULTATION RESPONSES 
Scottish Water
No objection subject to standard guidance 
Transport Planning
No objections to this proposal, but flag that with no off street parking residents
will be required to park on-street or in off-street car parks.  In addition, with
very little outdoor space, there would be no space to store a bike within the
vennel, so is likely to have to be stored within the property.   
Development Contributions Officer
No contributions required for Transport and Education due to development
type and size. 
Structures And Flooding
No objections. Informative requested drawing applicant’s attention to
Supplementary Guidance on Flood Risk and Flood Risk Assessments. 
Environmental Health (Noise Odour) - Noise
No adverse comments to make. Despite the presence of several air
conditioning units within close proximity to the application, giving a worst-case
scenario of all air conditioning units being on and presuming these are on
during normal working hours for the commercial property which is a bank the
37

Page 32

4 
total sound pressure level would be 54dB at the units.  Given the distance
attenuation to proposed dwellinghouse acceptable levels should be
achievable for airborne nois.  There are other residential properties within
close proximity to the existing air conditioning units and to my knowledge this
Service have not received any complaints with regards to noise from these
units. This Service also has powers under the Environmental Protection Act
1990 statutory nuisance to deal with any noise complaints. 
Conservation Team
No objection as the site is accessed via a private pend and is not publicly
visible. Content that the impact of the proposed development on the
conservation area would be negligible. 
REPRESENTATIONS 
None 
ADDITIONAL STATEMENTS 
Screening Opinion  EIA Not Required
Environmental Impact Assessment (EIA):
Environmental Report
Not applicable
Appropriate Assessment AA Not Required
Design Statement or Design and Access
Statement
Not Submitted
Report on Impact or Potential Impact eg Flood
Risk Assessment
Not Required 
APPRAISAL 
Sections 25 and 37 (2) of the Town and Country Planning (Scotland) Act 1997
require that planning decisions be made in accordance with the development
plan unless material considerations indicate otherwise.  The Development
Plan for the area comprises the approved TAYplan and the adopted LDP2. 
In this instance, section 64(1) of the Planning (Listed Buildings and
Conservation Areas) (Scotland) Act 1997 is relevant and requires planning
authorities to pay special attention to the desirability of preserving or
enhancing the character or appearance of the designated conservation area. 
The determining issues in this case are whether; the proposal complies with
development plan policy; or if there are any other material considerations
which justify a departure from policy. 
Policy Appraisal - Principle 
Policy 3 – Perth City of the Local Development Plan 2 sets out the Council’s
intention to work with developers to facilitate the development of underutilised
38

Page 33

5 
land and/or to assist with the delivery of social and environmental benefits
identified in the Perth City Plan 2015-35. It also pledges to assist with the
preparation of development proposals that are consistent with the
Placemaking Supplementary Guidance. 
Policy 11 – Perth City Centre Secondary Uses Area promotes a mix of
different appropriate uses including residential. 
As such, the principle of introducing new residences in this area of Perth City
Centre may be acceptable, subject to assessment of placemaking matters
including design and layout, residential amenity, drainage and flooding, and
heritage. 
Design and Layout
Policy 1A – Placemaking states that development must contribute positively to
the quality of the surrounding built and natural environment. Policy 1B
identifies ten placemaking criteria which all development proposals should
meet. Of particular relevance to this site is criteria (a) “create a sense of
identity by developing a coherent structure of streets, spaces, and buildings,
safely accessible from its surroundings”; (d) “access, uses and orientation of
principal elevations should reinforce the street or open space”; and (e) “all
buildings , streets and spaces should create safe, accessible, inclusive places
for people, which are easily navigable, particularly on foot, bicycle and public
transport”. 
Placemaking Supplementary Guidance states that “Backland development
consisting of one or more dwellings situated immediately behind one another
is generally unsatisfactory in any location, but particularly when sited on
modest sized plots or sharing a single access due to associated problems
with: overlooking; noise and light disturbance; general loss of amenity; and
adverse impact on the character of the area.” 
Furthermore, Scottish Planning Policy identifies six key attributes of the
Placemaking process: Distinctive; Safe and Pleasant; Easy to move around
and beyond; Welcoming; Adaptable; and Resource Efficient. 
The proposed residence would have its primary entrance some 25 metres
from the High Street frontage, accessed through a lit pend for the first ten
metres where there is an access gate, then along an unlit vennel for the
remaining distance to the proposed dwelling entrance door. This private open-
air vennel is flanked by an existing single storey commercial building on the
east, with no active frontages at ground level and six air conditioning units
mounted above head height, whereas the western boundary is characterised
by a mixture of high walls and corrugated steel sheets which separate the
vennel from a private car park. 
It is acknowledged that there are upper floor windows at neighbouring
properties to the north and south. However, the likelihood of meaningful
overlooking from these windows, if any, is undermined by the lack of ground
floor activity, poor lighting and boundary treatment along the vennel, and the
39

Page 34

6 
remoteness of the entrance door from the public street. This all contributes to
the access being unwelcoming and without a sense of safety for future
occupiers or visitors. The applicant’s agent did suggest that access could
alternatively be arranged from Scott Street car park through a separate pend
which is outwith the application site but within the applicant’s ownership.
However, whilst the car park is better lit than the vennel, the route across it,
particularly after dark, would be more remote from natural overlooking and
would fail to provide an appropriate sense of safety. In these respects, the
proposal would fail to accord with Policy 1B – Placemaking. 
In terms of the internal layout and quality of the proposal, the only vertical
window which would serve the proposed ground floor kitchen/living space
would look directly at a neighbouring building across a narrow gap of just 0.73
metres in width. The window has an internal reveal depth of 0.90 metres, and
as such the amount of natural light reaching the kitchen/living area from this
window would be extremely limited. It was only after the planning case officer
queried the lack of natural light reaching the ground floor that revised
drawings were submitted showing a first floor gallery with two additional roof
windows intended to serve both the bedroom and kitchen/living space below.
A proposed door between this space and the entrance hallway was also re-
annotated as being “glazed” in revised drawings. Whilst these revisions have
improved matters, the proposed ground floor space would still be rather dark
and overly reliant on artificial lighting during daylight hours. 
The proposed first floor bedroom would be better lit by virtue of the
introduction of a west-facing roof extension, albeit with an underwhelming
outlook across the adjacent private car park. 
The provision of an accessible WC appears to make use of a space defined
by the existing structural layout of the building, but is somewhat undermined
by the fact that the proposed bedroom can only be accessed via staircase. 
Whilst it is acknowledged that city centre development sites can be
constrained, the nearest open green space is located approximately 500
metres away at North Inches, and the site is too small to incorporate private
amenity space. Officers consider that had the application site incorporated the
structures immediately to the north and south, that a better quality of design
could have been achieved in terms of approach, internal quality and perhaps
even private amenity space. In other words, the highly constrained nature of
the current application site mean that any design solution would struggle to
meet Placemaking criteria. To this end, officers have suggested an
enlargement of the property to the south within the applicant’s ownership as
an alternative to the current proposal. That option remains open to the
applicant, although would necessitate considerations as part of a new
planning application. 
As such, the general internal quality of the proposed dwelling would be poor,
and would be further exacerbated by an unwelcoming approach route which
would lack a sense of safety for occupants or visitors as described elsewhere
40

Page 35

7 
in this report. In these respects, the proposal fails to accord with Policy 1B –
Placemaking and associated Placemaking Supplementary Guidance. 
Residential Amenity
The proposal, by virtue of the orientation of its existing and proposed
fenestration, would not harm the living conditions of neighbouring residents. 
In terms of noise, whilst it is acknowledged that there are six air conditioning
units located along the access vennel which leads from High Street to the
proposed dwelling entrance, the Environmental Health Team are satisfied that
these are unlikely to cause disturbance to future occupants, and any
excessive noise issues could be addressed through statutory nuisance
powers. 
Low & Zero Carbon
The proposal is for change of use and alterations to an existing building, and
as such is exempt from the requirements of Policy 32 - Embedding Low &
Zero Carbon Generating Technologies in New Development 
Roads
It is acknowledged that no car parking or cycle parking is proposed in this
development. In light of the well connected, city centre location of the
development, the lack of dedicated car parking provision would be acceptable.
The Transport Planning team have not objected, and have noted that there is
theoretical space to store a bicycle internally in the proposed dwelling. As
such, the proposal would accord with the intent of Policy 60B - Transport
Standards and Accessibility Requirements. 
Drainage and Flooding 
The application site is designated as having a low probability of surface water
flooding by SEPA. Notwithstanding this, the Council’s Flooding Team have not
objected, nor have SEPA. In the event of approval, informatives would have
drawn the applicant’s attention to relevant flooding and water supply
information. The proposal accords with the relevant parts of Policy 53 - Water
Environment and Drainage. 
Conservation Considerations & Visual Amenity 
Whilst the proposal is in Perth Central Conservation Area, its position within a
back-land location with limited public views is such that the proposed external
changes would preserve the character and appearance of the Conservation
Area. The proposal accords with Policy 28A Conservation Areas – New
Development. In the event of approval, a planning condition would have
sought addition detail of the proposed external cladding of the roof extension. 
Natural Heritage and Biodiversity 
The building is not of an age, material or construction type to have potential
for protected species. In the event of approval, an informative would have
41

Page 36

8 
reminded the applicant of their responsibilities in the event that any protected
species were encountered during the proposed conversion works. 
Developer Contributions 
The Developer Contributions Guidance is not applicable to this application by
virtue of its type and size. Therefore, no contributions are required in this
instance. 
Economic Impact 
The economic impact of the proposal is likely to be minimal and limited to the
construction phase of the development. 
VARIATION OF APPLICATION UNDER SECTION 32A 
This application was varied prior to determination, in accordance with the
terms of section 32A of the Town and Country Planning (Scotland) Act 1997,
as amended.  The variations incorporate a minor change to the application
site boundary in the interests of accuracy, additional roof windows to the
eastern roof slope, and internal layout changes. 
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS 
None required.   
DIRECTION BY SCOTTISH MINISTERS 
None applicable to this proposal. 
CONCLUSION AND REASONS FOR DECISION 
The application must be determined in accordance with the adopted
Development Plan unless material considerations indicate otherwise.  In this
respect, the proposal is considered to be contrary to the Development Plan. 
Account has been taken of the relevant material considerations and none has
been found that would justify overriding the adopted Development Plan.  
Accordingly, the proposal is refused on the grounds identified below. 
Conditions and Reasons 
1 The proposed dwellinghouse, by virtue of its constrained back-land
location and poor internal design, would fail to contribute positively to the
quality of the surrounding built environment. It would fail to create a coherent
structure of spaces and buildings, or a safe, accessible and easily navigable
place for future occupiers and visitors. 
42

Page 37

9 
Approval would therefore be contrary to Policies 1A and 1B(a)(d)(e) of the
Perth and Kinross Local Development Plan 2 (2019) and Placemaking
Supplementary Guidance (2020). 
Justification 
The proposal is not in accordance with the Development Plan and there are
no material reasons which justify departing from the Development Plan. 
Informatives 
None Required. 
Procedural Notes 
Not Applicable. 
PLANS AND DOCUMENTS RELATING TO THIS DECISION 
02 
04 
05 
06 
07 
43

Page 38

44

Page 39

Appeal Document GP03 – Photographic record of existing situation 
Existing Pend leading to front door of appeal
site
Entrance point to appeal property
Internal view of existing space proposed for
living
Internal view of existing space proposed for
living
45

Page 40

Internal space with existing skylight window Internal space with existing living space window 
46

Page 41

Appeal Document GP04 – Photographic record of proposed living 
Proposed Alley way light, landscaped and
secure by design
Entrance point to appeal property, well lit,
secure by design
External seating amenity space Front entrance to proposed dwelling
47

Page 42

Internal living spaces 
48

Page 43

49

Page 44

50

Page 45

Edinburgh Design Guidance
January 2020
51

Page 46

Foreword
Edinburgh Design Guidance - building our future
Edinburgh is internationally renowned for its stunning architecture, beautiful green spaces, World Heritage Site status, art and literature.
Topography and landscape have massively influenced built form in the city. There is the medieval walled Old Town on a slope and the plateaued Neo-Classical New Town.
This is in addition to the city’s rolling tenemented and terraced stone suburbs of the 19th and 20th Centuries that were carefully planned by ambitious city councils.
Pioneering Town Planner Patrick Geddes placed importance on spirit of place, landform and locality (genius loci), influencing 20th Century city architect Ebenezer
MacRae’s work both in the Old Town and in the later suburban housing estates. These have further reinforced the unique qualities of the city we have today, a city with
two world heritage sites that consistently ranks as one of the best places in the UK to live, work and study.
Respecting and building on this legacy is important for our economic and social well-being as the city’s current strength owes much to its inspiring past foresight and
today we can build tomorrow’s heritage. Building well must become a reality that we can pass on to our children and theirs.
We all need to grasp this challenge. In the context of an expanding city, this is something we should be addressing. The Edinburgh Design Guidance will play its part.
To achieve this we must all work to the same ambition. Councillors, planning officers and developers must all have the same aims for the city. We should be creating
developments that we are proud of, and not just adding another suburban extension to the last one. We need to create new and sustainable city
suburbs and employment areas that are places which reflect and build upon the city’s rich architectural and design qualities. They need to be places in their own right
being both well connected and of an appropriate density to help support walking, cycling and public transport to help maintain the compact character of Edinburgh.
As society changes, the city too is entering a new era of change and development. There is an opportunity for us all to play a part in creating an urban legacy for future
generations. This guidance supplements and reinforces the Edinburgh Local Development Plan and is a tool to be used by everyone to work together for good city
building and in striving to achieve an inspirational city which meets 21st Century needs.
I would like to thank all those who have been part of this latest update.
Councillor Neil Gardiner
Convener of Planning
52

Page 47

Contents
Edinburgh Design Guidance ................................................................................ 1
Introduction ......................................................................................................... 2
Policy context ................................................................................................................3
Edinburgh ......................................................................................................................4
The Challenge ................................................................................................................6
Promoting good design .................................................................................................7
1.  Context, placemaking and design ................................................................... 8
1.1   Appraising the site and context ..............................................................................9
1.2   City skyline, tall buildings and protected views .....................................................17
1.3   Assessments and statement ...................................................................................24
1.4   Coordinate development ........................................................................................26
1.5   Density ....................................................................................................................30
1.6   Incorporate existing views .....................................................................................35
1.7   Incorporate natural and landscape features ...........................................................36
1.8   Incorporate existing buildings and built features ..................................................38
1.9   Incorporate Art in public spaces .............................................................................40
2.  Designing places: buildings ........................................................................... 43
2.1   Height and form ......................................................................................................44
2.2   Scale and proportions ............................................................................................46
2.3   Position of buildings on site ..................................................................................47
2.4   Design, integration and quantity of parking ..........................................................53
2.5   Environmental protection .......................................................................................67
2.6   Minimise energy use ..............................................................................................69
2.7   Materials and detailing ..........................................................................................70
2.8   Adaptability ...........................................................................................................80
2.9   Mix of uses .............................................................................................................81
2.10   Daylight, sunlight, privacy and outlook ...............................................................82
2.11   Housing mix and size, and supporting facilities ...................................................86
2.12   Purpose built homes for rent ................................................................................89
2.13   Community safety .................................................................................................91
2.14   Waste Management ..............................................................................................92
3.  Designing places: landscape, biodiversity and the water environment ....... 95
3.1   Green infrastructure and green/blue networks ......................................................96
3.2   Publicly accessible open space ..............................................................................100
3.3   Private open space .................................................................................................104
3.4   Biodiversity ............................................................................................................106
3.5   Trees .......................................................................................................................113
3.6   Planting ..................................................................................................................115
3.7   Hard landscape.......................................................................................................118
3.8   Water environment .................................................................................................120
4.  Designing streets: Edinburgh Street Design Guidance ................................. 125
4.1   Introduction to the Edinburgh Street Design Guidance ..........................................126
4.2   Guiding Principles ..................................................................................................130
4.3   Street Pattern/Structure ........................................................................................133
4.4   Edinburgh Street Framework .................................................................................135
4.5   Levels of Design intervention .................................................................................139
4.6   Design principles ...................................................................................................141
4.7   Quality Audit ..........................................................................................................155
Frequently Asked Questions ..........................................................................................156
Appendix A:  Information required for submission with a planning application ...........158
Appendix B:  Edinburgh Street Design Guidance Detailed Design Manual and Index ..163
Appendix C:  Protected views - Detailed guidance on the landmark features ...............182
53

Page 48

1
Edinburgh Design Guidance
How does it relate to other guidance?
This document is part of a suite of non-statutory
planning guidance which interpret the policies set
out in the Local Development Plan. It is important
that, where applicable, these are read in conjunction
with one another. For example, when designing a new
building in a conservation area, reference should be
made to this guidance and the Guidance on Listed
Buildings and Conservation Areas
Guidance for Householders
February 2019
Guidance for Businesses
February 2019
Listed Buildings and
Conservation Areas
Updated February 2019
Updated February 2019
Guidance for Development in
the Countryside and Green Belt
Other planning guidance is available including - Student Housing; Communications infrastructure; and Outdoor
Advertising and Sponsorship.
Edinburgh also has a number of site/area specific planning guidance, including Development Briefs.
Further information
If you require any further information or clarification, please visit our website at http://www.edinburgh.gov.uk/
info/20013/planning_and_building or contact the Planning Helpdesk on 0131 529 3550.
How is it structured?
There are chapters on Context, placemaking and design;
Designing places - buildings;
Designing places – landscape, biodiversity and the water environment; and
Designing Streets: Edinburgh Street Design Guidance.
SUPPLEMENTARY GUIDANCE
DEVELOPER CONTRIBUTIONS &
INFRASTRUCTURE DELIVERY
Finalised version August 2018
12
1.1 Appraising the site and context
Survey the site and immediate context and analyse
the character of the wider landscape and townscape
surrounding a development site.
Survey the existing scope of visibility and the
amenity value of these views within the city and
surrounding landscape.
Evaluate changes to character and views that will
result from development and use the findings to
inform design review and finalised proposals.
Survey and analyse the historic environment and use
findings to inform design proposals.
For a proposal to respond positively to its context,
it is essential that it is designed with a good
understanding of its site and the surrounding area
and the wider city. This will help the development
of a sound and sustainable concept around which
the design is structured.  The Council expects
the masterplan layout to be designed by a multi-
disciplinary team including architects, urban
designers, landscape architect, flood engineers, and
historic environment professionals as appropriate. 
For continuity the multi-disciplinary team should be
involved from inception of the project to completion.
Information required in a site survey and appraisal
Landscape Geology, topography, landform, existing vegetation, including Trees (section 3.5), use of
landscape by people, historical/archaeological assets, description of local landscape character
and key landscape characteristics of site and context and analysis of the above.
Ecology Preliminary Ecological Assessment, to identify habitats and protected species within the site and
opportunities for linkage with adjacent habitats. See 3.4 Biodiversity on page ??.
Hydrology, drainage,
services
Locations of services and utilities (above and below ground). Water features and flood extents
(including culverted river courses). See 3.8 Water environment on page ??.
Townscape Listed buildings and their setting, focal points, landmarks, architectural style, feu pattern &
building line, conservation area appraisals.
Streets/Movement How the site relates to the wider network of streets, footways and cycle routes and how these
streets and routes are used. Consideration at different scales: structural, layout and detail.
Views Survey Visual Assessment (see following pages) The extent to which the site is visible, whether the site
is in a protected view or other important local or city view. Whether there are views to landmark
features or other important features from site.
Microclimate/Air
Quality
Sunpaths for winter & summer, prevailing wind in terms of shelter of urban blocks and tree
planting, aspect and micro-climate in relation to solar
gain & planting proposals. Existing air quality issues.
Planning/other
designations
Is the site in the World Heritage Site? The airport exclusion zone? A site of importance for nature
conservation? The extent to which it meets requirements of Council’s Open Space Strategy etc.
Schemes with a poor understanding of context, urban
form and sustainability will be refused. The design
team should be aiming to provide a landscape design
of the highest standard. The council would encourage
proposals which meet the ‘Building with Nature
‘Excellent’ ‘standard.
Contextual evaluation should consider the impact of
the proposal in terms of its physical structure: mass,
density, materials, height, as well as its function and
uses. Consideration should be given to whether it has
a positive impact on the local community and whether
that impact is local or area-wide.
Local Development Plan policies
• Des 1 - Design Quality and Context
• Des 3 -   Development Design
• Des 4 -   Development Design
• Des 11 - Tall Buildings
• Env 1 -   World Heritage Site
• Env 6 -   Conservation Areas
• Env 7 - Historic Gardens and Designed Landscapes
• Env 11 - Special Landscape Areas
• Env 17 - Pentland Hills Regional Park
1
Site appraisal
These drawings and images illustrate some of the ways a site can be appraised—in this case the gap site next
to the City Art Centre. Information like this helps build up an understanding of a site—it does not prescribe the
way it should be developed.
Views to site Buildings and routes
Gable windows
on art centre
Cockburn
Street
SiteMarket
Street
Station
Site
Vertical
emphasis to
windows
Variety of building
heights—generally falling
from east to west
Site sits within
herringbone pattern of
Old Town streets and
closes
00 50m50m
NN
Views to site from Princes
St Gardens, Roof of Princes
Mall & North Bridge
00 100m100m
NN
Prevailing
wind
Sun path  from east to west
00 50m50m
Site sheltered by
buildings to west
Site shaded by
tall buildings
to south, east
and west
Important nearby features Building heights and form
Microclimate
Site section
Technical guidance
The introduction to each chapter sets out over-arching aims and expectations for new development.
Each subject area has its own section.
Main design principles introduce each section.
Explanatory text is included,
where relevant to provide more
detail.
Technical guidance is contained in
the grey pages.
Local plan policy references are
included.
54

Page 49

2
Introduction
This updated guidance sets out the Council’s
expectations for the design of new development in
Edinburgh.
Greater emphasis has now been placed on creating
places that support the development of a compact,
sustainable city and respond to the challenges of
climate change. Support for active travel and public
transport is reflected in revised parking controls in
new developments. Landscape, biodiversity and green
infrastructure are given greater prominence to reflect
the contribution they make to placemaking, quality
of life, health and wellbeing, and towards mitigating
the impacts of climate change. Air quality, which is
fundamental to public health and quality of life, is
addressed through various mechanisms, including the
requirement to make provision for electric charging
points to support the use of vehicles that emit lower
levels of emissions.
The Council wants new development to create great
places for people to live, work and enjoy. In order
to do this, we need to achieve the highest quality of
design that integrates successfully with the existing
city.
Many recent developments have achieved this aim
and some are used as examples in the guidance.
These developments establish a standard for
the design quality of new development. Where
appropriate, the guidance includes examples from
outwith Edinburgh.
This guidance is intended for all new developments
and includes the Edinburgh Street Design Guidance,
which was previously a separate document. This will
allow a holistic, place-based approach to design and
development. The examples given show principles
and concepts that apply to a range of different
developments and examples of good street design.
The guidance should be used as a point of reference,
as a basis for the planning and design of new
development proposals and will be a material
consideration in assessing planning applications. It
aims to:
• provide guidance on how to comply with the
policies in local plans;
• support good placemaking by bringing together
guidance for streets, spaces and buildings;
• explain the key ideas which need to be considered
during the design process;
• give examples of good quality design; and
• set out the requirements for design and access
statements.
Each section provides guidance on specific topics that
should be used as appropriate. It is important that
it is read in conjunction with statutory development
plans and other planning guidance depending on the
type and location of development.
The Council’s design-related policies can be broadly
divided into themes relating to context, built form,
landscape and biodiversity. This is reflected in
the structure of the guidance. Where appropriate,
technical guidance is included along with links to
associated guidance and information.
55

Page 50

3
Policy context
designing
A Policy Statement for Scotland
streets
Scottish Government policy
The new Planning (Scotland) Act 2019, an emerging
National Transport Strategy, policies and programmes
relating to Climate Change adaptation, Cleaner Air for
Scotland – the Scottish Governments policy document
on Air Quality, and the introduction of the Place
Principle all reflect a changing policy context. A more
co-ordinated approach with outcomes that deliver
better places is a common theme.
Creating Places and Designing Streets are the two
planning policy documents for Scotland that relate
to design. They set out government aspirations
for design and the role of the planning system
in delivering these. They are material planning
considerations.
Creating Places sets out the six qualities of successful
places as:
• distinctive;
• safe and pleasant;
• easy to move around;
• welcoming;
• adaptable; and
• resource efficient.
These guiding principles underpin the approach to
delivering good places.
The Society of Chief Officers for Transportation in
Scotland’s (SCOTS) National Roads Development
Guide provides technical guidance to support the
design aspects of Designing Streets, by focusing on
how to achieve Roads Construction Consent (RCC)
for all new or improved roads for a local authority to
adopt.
The Development Plan
The SESplan Strategic Development Plan and the
Edinburgh Local Development Plan make up the
Development Plan for Edinburgh. This guidance
interprets and applies the policies set out in the Local
Development Plan and provides more detailed advice.
The Local Development Plan, which was adopted
in November 2016, provides the main basis for
determining planning applications.NATIONAL 
ROADS DEVELOPMENT GUIDE
S  C  O  T  SS  C  O  T  S
NOVEMBER 2016
EDINBURGH LOCAL DEVELOPMENT PLAN
56

Page 51

4
Edinburgh
Edinburgh is a unique and beautiful city - recognised
by the UNESCO inscription of its two world heritage
sites: the Old and New Towns of Edinburgh and
the Forth Bridge. Its distinct geography and rich
and varied heritage of buildings and urban design
combine to create a unique cityscape. Edinburgh is a
city of startling contrast – between its landscape and
buildings and in its streets and spaces.
Landscape is vitally important. Containment is
provided by the Firth of Forth to the North and the
Pentland Hills to the South, but it is the hills within
Edinburgh that create some of the most striking
aspects of its setting. Castle Hill, Arthur’s Seat, Calton
Hill and others create a three dimensional city. Not
only do they dominate views throughout the city, but
they also create vistas, allowing the city to be seen
and understood from a series of different vantage
points.
The topography of hills, ridges and valleys have
enabled the development of a series of distinct areas
that juxtapose with one another. Nowhere is this
interplay between landscape and buildings clearer
than in the city centre. Both the Old and New Town
are designed around their landforms. In the Old Town,
the Royal Mile slopes gently down the Old Town ridge;
buildings are tightly packed together off closes that
run down to the Waverley and Cowgate valleys. The
New Town’s more undulating landscape is reflected in
its spacious and geometrically ordered streets.
Throughout history, the city has evolved in response
to changing needs and growth. In the 18th and 19th
centuries, bridges and streets were thrust into the
medieval pattern of the Old Town to create links
with the wider city and improve the environment
by providing more air and light. Edinburgh has also
embraced change to meet current needs.
Subsequent expansion of the city have has created
distinctive neighbourhoods with their own sense of
place but which also contribute to the character of the
city as a whole. Areas like the Grange, Marchmont and
Bruntsfield, Inverleith, Leith, Gorgie and Dalry, have
different building forms, but with their consistent
heights, sandstone walls, slate roofs, vertical windows
and architectural motifs they feel very much part of
Edinburgh.
Although the later post war suburban areas of the city
are less distinct, their simple layouts knit well into the
wider city. Where streets align with the city’s landmark
features, their sense of belonging to Edinburgh is
amplified.
Confident modern developments sit alongside some
of the oldest buildings in the city. Ironically, this
process of change means many parts of the Old Town
are younger than large swathes of the New Town.
View to the Pentland Hills from Arthur’s Seat Tightly packed buildings in the Old Town - View towards the castle
from Lawnmarket
Royal Circus in the New Town
57

Page 52

5
Edinburgh contains the greatest concentration of built
heritage assets in Scotland, with nearly 5,000 listed
items comprising over 30,000 separate buildings.
These range in scale from the Forth Rail Bridge to the
statue of Greyfriars Bobby, and in age from the 12th
century to the late 20th century. The city accounts
for about one-third of all the ‘A’ listed buildings in
Scotland and has a much higher proportion of ‘A’
listed buildings than the national average.
Edinburgh has a total of 49 conservation areas
covering 25% of the urban area with a resident
population of over 100,000. Each conservation
area has its own unique character and appearance.
The variation in character illustrates the history
of Edinburgh. They range from the internationally
famous New Town, which is the largest conservation
area in Scotland, to small villages which have been
absorbed as the city expanded.
The public realm of Edinburgh offers a wealth of
streets, squares and spaces, gardens and pedestrian
spaces, which act as gathering places for people and
settings for the historic buildings making an important
contribution to the architectural character of the area.
It can be seen as the glue that binds places together.
This combination of natural and built heritage
should be maintained and enhanced. The principles
presented here are informed by qualities that
make Edinburgh special. They seek to achieve new
development that draws on and interprets the past;
with an emphasis on creativity and innovation rather
than prescription.
An Old Town Improvement Street: Cockburn Street Modern Edinburgh colony houses - Leith Fort Tenements in Bruntsfield - Gillespie Crescent
Suburban housing in south east Edinburgh
58

Page 53

6
The Challenge
The quality of our environment undoubtedly contributes
towards Edinburgh’s success as an international city
to which people and businesses are attracted. For
this to remain the case, it is vitally important that we
continue to respect the existing built fabric. In doing
so, Edinburgh should not become a museum piece.
Instead, the city must continue to embrace change so
that it can adapt to its evolving needs. However, this
sets up a possible tension—between preservation and
change. As many of the examples used in this guidance
demonstrate, design led solutions can resolve a range
of competing needs.
Where surrounding development is fragmented or of
poor quality the aim is to establish a new context that
better reflects the inherent character of Edinburgh.
The Council encourages model forms of development
that generate coherence and distinctiveness. Both
the historic environment and the many modern
developments shown in this guidance provide context
of quality that should be reflected in these situations.
Innovative placemaking and design solutions will be
required to ensure resilience to the predicted impacts
of climate change. These impacts include an increase in
extreme weather events such as overheating, extreme
rainfall, increased average temperatures which will be
similar to Paris by 2080 which will increase the Urban
Heat Island effect.  Permeable, vegetated surfaces to
absorb rainwater, shading and cooling from vegetation
will be essential parts of the solution to create liveable,
resilient places and buildings. Living roofs, trees,
landscaping and above ground SuDS are all essential
green infrastructure components to be incorporated
into resilient placemaking. 
Integrating blue and green infrastructure into new
and existing developments can reduce the risk of
flooding and act as a buffer against noise and air
emissions from vehicles, whilst providing open
spaces for walking, cycling and nature.
A design process that challenges conventional ways
of doing things will be key to creating successful
places, particularly for new and emerging suburban
areas.
Air quality has become a particular challenge in
cities across the world. Considered use of design and
placemaking can minimise the impacts of pollution
while, at the same time, promoting spaces for
walking, cycling and nature.
If the aims of this guidance are met, forthcoming
developments will be more successful in the
longer term - meeting the needs of all who use and
experience the city.
59

Page 54

7
Promoting good design
It is important to achieve the highest quality of design
possible. This means committing to good quality at
every stage of the design process.
Well designed developments can actively enhance the
environment; manage exposure to air, noise and light
pollution and reduce overall emissions. In contrast,
other new developments may increase the emission
of pollutants that are harmful to human health and
impact on the quality of life.
Pre-application advice
The Council encourages and promotes engagement on
design issues through pre-application advice.
Providing advice prior to the formal submission of
a planning application can ensure that the quality
of a development is improved and certainty in the
outcome can be increased for the applicant.
This process provides an opportunity to consider the
development in principle and to influence its design,
so that potential problems are resolved or reduced.
This will avoid the need for expensive and time-
consuming retrospective re-design.
Design review
The Council supports the process of design review.
Depending on the size, complexity and sensitivity
of the site, proposals may be referred to either
Architecture + Design Scotland (the Scottish
Government’s advisory body on urban design matters)
or the Edinburgh Urban Design Panel. This should be
done at the pre-application stage.
Architectural quality and competitions
The Council’s policies and guidance aim to raise the
urban design quality within the city. For particularly
important or sensitive sites or for some nationally
important uses, architectural competitions may be the
best way of ensuring the highest architectural quality.
Community and place
Good design needs to take account of community
needs and community aspirations. The Review of the
Planning System and the Community Empowerment
Act require that the community become more involved
in helping to deliver better places. Use of tools like
The Place Standard show how local needs can be
incorporated into development briefs and other
planning processes.
View from Meadows of new housing
60

Page 55

8
This chapter sets out the Council’s expectations for how new development should relate to its context; a key theme
throughout this document. High quality design supports the creation of good places and has a positive impact on
health and wellbeing. The highest standards of design can be achieved through the factors set out in the Scottish
Government’s Creating Places and Designing Streets policies, to create new vibrant places which are distinctive, safe
and pleasant, easy to move around, welcoming, adaptable and sustainable.
1.  Context, placemaking and design
The key aims for new development are:
• demonstrate an understanding of the unique characteristics of the city and the context within which it is located;
• demonstrate an understanding of the historical development of the site;
• reinforce its surroundings by conserving and enhancing the character and appearance of the landscape and townscape; including
protecting the city’s skyline and locally important views;
• ensure that adjacent development sites are not compromised and that there is a comprehensive approach to layout;
• provide appropriate densities depending on their existing characteristics;
• incorporate and use features worthy of retention, including natural features, buildings and views; and
• demonstrate a good understanding of the existing water environment on site and provide a creative response to manage future surface
water.
61

Page 56

9
1.1   Appraising the site and context
Survey the site and immediate context and analyse
the character of the wider landscape and townscape
surrounding a development site.
Survey the existing scope of visibility and the
amenity value of these views within the city and
surrounding landscape.
Evaluate changes to character and views that will
result from development and use the findings to
inform design review and finalised proposals.
Survey and analyse the historic environment and use
findings to inform design proposals.
For a proposal to respond positively to its context,
it is essential that it is designed with a good
understanding of its site and the surrounding area
and the wider city. This will help the development
of a sound and sustainable concept around which
the design is structured.  The Council expects
the masterplan layout to be designed by a multi-
disciplinary team including architects, urban
designers, landscape architect, flood engineers, and
historic environment professionals as appropriate. 
For continuity the multi-disciplinary team should be
involved from inception of the project to completion.
Information required in a site survey and appraisal
Landscape Geology, topography, landform, existing vegetation, including Trees (section 3.5), use of
landscape by people, historical/archaeological assets, description of local landscape character
and key landscape characteristics of site and context and analysis of the above.
Ecology Preliminary Ecological Assessment, to identify habitats and protected species within the site and
opportunities for linkage with adjacent habitats. See 3.4 Biodiversity on page 106
Hydrology, drainage,
services
Locations of services and utilities (above and below ground). Water features and flood extents
(including culverted river courses). See 3.8 Water environment on page 120
Townscape Listed buildings and their setting, focal points, landmarks, architectural style, feu pattern &
building line, conservation area appraisals.
Streets/Movement How the site relates to the wider network of streets, footways and cycle routes and how these
streets and routes are used. Consideration at different scales: structural, layout and detail.
Views Survey Visual Assessment (see following pages) The extent to which the site is visible, whether the site
is in a protected view or other important local or city view. Whether there are views to landmark
features or other important features from site.
Microclimate/Air
Quality
Sunpaths for winter & summer, prevailing wind in terms of shelter of urban blocks and tree
planting, aspect and micro-climate in relation to solar
gain & planting proposals. Existing air quality issues.
Planning/other
designations
Is the site in the World Heritage Site? The airport exclusion zone? A site of importance for nature
conservation? The extent to which it meets requirements of Council’s Open Space Strategy etc.
Schemes with a poor understanding of context, urban
form and sustainability will be refused. The design
team should be aiming to provide a landscape design
of the highest standard. The council would encourage
proposals which meet the ‘Building with Nature
‘Excellent’ ‘standard.
Contextual evaluation should consider the impact of
the proposal in terms of its physical structure: mass,
density, materials, height, as well as its function and
uses. Consideration should be given to whether it has
a positive impact on the local community and whether
that impact is local or area-wide.
Local Development Plan policies
• Des 1 - Design Quality and Context
• Des 3 -   Development Design
• Des 4 -   Development Design
• Des 11 - Tall Buildings
• Env 1 -   World Heritage Site
• Env 6 -   Conservation Areas
• Env 7 - Historic Gardens and Designed Landscapes
• Env 11 - Special Landscape Areas
• Env 17 - Pentland Hills Regional Park
62

Page 57

10
Much of the city’s built up area is defined by a
traditional townscape character that creates
a high quality, sustainable and vibrant urban
environment. Consideration should be given to the
way new buildings are inserted into the framework
of the existing townscape; respecting its scale and
producing architecture of the highest quality.
Architectural form and building heights must,
therefore, be appropriate to location and function.
The objective is to preserve and enhance the existing
townscape character, and pursue the highest
architectural and urban design quality, incorporating
social; environmental and economic needs.
New development should be sensitive to historic
character, reflect and interpret the particular quality of
its surroundings, and respond to and reinforce locally
distinctive patterns of development, townscape,
landscape, scale, materials and quality.
New development should strengthen the context
of existing conservation areas, respecting the
topography, physical features, views and vistas.
There is no simple prescription for good architecture
beyond the precepts of ‘commodity, firmness and
delight’. Good new buildings in historic settings
should not merely be fashionable, but should stand
the test of time. Conformity to restrictive formulae or
the dressing of modern structures in traditional forms
may fail to produce quality architecture. The aim is to
encourage development which reflects and creatively
interprets the past. Consistency and continuity
is important, and new buildings should not draw
attention to themselves disproportionately.
Historic environment
The historic environment includes historic buildings,
townscapes, parks, gardens and designed landscapes,
landscape, the layout of fields and roads, the remains
of a wide range of past human activities, ancient
monuments, archaeological sites and landscapes
and many other features. It comprises both statutory
and non-statutory designations and a range of non-
designated historic assets and areas of historic
interest.
Scottish Government’s policies on alteration or change
in the historic environment are set out in Scottish
Planning Policy (SPP).
The Historic Environment Policy for Scotland
(HEPS) sets out how to approach decisions in the
planning system affecting the historic environment.
The ‘Managing Change in the Historic Environment’
guidance series provides best practice advice in
assessing development proposals against the HEPS.
The Interim Guidance on the Principles of Listed
Building Consent and the Interim Guidance on
Conservation Areas provides detailed guidance on
the application of HEPS to applications impacting
listed buildings and Conservation Areas setting out
the principles that are recommend are followed in the
Scottish planning system.
There are two World Heritage Sites (WHS) in the
city: The Old and New Towns of Edinburgh and the
Forth Bridge. These require particular consideration.
Historic Environment Scotland’s Managing Change
in the Historic Environment: World Heritage provides
advice. There are management systems in place
for both World Heritage Sites to ensure that their
‘Outstanding Universal Value’ (OUV) is protected.
Where change may affect the OUV of the Old and
New Towns of Edinburgh or the Forth Bridge WHS,
consideration of cultural [and/or natural] heritage
attributes should be central to planning any proposal. 
These should be presented early on in any general
assessment (such as an Environmental Impact
Assessment - EIA).  Decision makers should carefully
consider the weight given to heritage conservation
needs.  A key consideration is the threat or risk to
World Heritage Site status and this should be clearly
addressed in any EIA or Heritage Impact Assessment
(HIA) report.  
Where a statutory environmental impact assessment
is required, cultural heritage sections must take
account of the ICOMOS Guidance on Heritage Impact
Assessments for Cultural World Heritage properties
where the EIA relates to a World Heritage Site. A
Heritage Impact Assessment (HIA) undertaken as
part of an EIA in these circumstances is not additional
to normal EIA requirements, but uses a different
methodology which clearly focuses on OUV and
attributes that convey that OUV. The requirements
should be made clear at the planning or scoping stage
and should take account of.
Conservation Area Character Appraisals explain the
special architectural and historic interest for each
of the City’s conservation areas. Edinburgh also has
a heritage of listed buildings. If these fall within or
adjacent to proposed development their significance
and setting should be surveyed and appraised.
Where a site is of known or suspected archaeological
significance a programme of archaeological works
will need to be agreed with the Council. As the
archaeology may influence the extent of development,
this should be done at the site appraisal stage. On
some sites, excavations may be required.
63

Page 58

11
Historic Environment Scotland’s national Inventory
of Gardens and Designed Landscapes in Scotland
describes landscapes of national importance.
Proposals should assess the impact the development
will have on the Gardens and their setting. Proposals
that potentially will affect local and regionally
important landscapes also require assessment. Refer
to guidance for the assessment of setting by Historic
Environment Scotland (HES) Managing Change in
the Historic Environment: Setting and The Garden
History Society Planning Conservation Advice Note
11 Development in the Setting of Historic Designed
Landscape.
Landscape character
Characterisation is a way to describe and understand
the distinct patterns of elements which combine to
create a ‘sense of place’, including geology, landform,
soils, vegetation, land use, urban form, architectural
style and experiential qualities.
A landscape character assessment can assist in
defining objectives to protect, manage or restructure
the landscape.
Edinburgh’s unique and diverse landscape contributes
to the city’s identity and international renown. The
landscape context is described in the Lothians
Landscape Character Assessment and in more detail
in the Edinburgh Landscape Character Assessment.
Special Landscape Areas have been identified as
being of particular quality and their Statements of
Importance also provide relevant information.
These should be referred to as part of a sites
landscape appraisal, helping to ensure that
developments interact with their surroundings and
aspire to shape high quality future landscapes.
The urban edge for example should be designed to
conserve and enhance the special character of the
city. See page 14 for technical information and
requirements.
Visual assessment
Visual assessment is a method to help understand
the changes to views that would be experienced by
people in the short, medium and long term should the
development go ahead.
It is an essential tool to explore design options and
assess the visibility of new proposals and how they
will be viewed in relation to existing built and natural
features.
In some instances the use of tethered balloons or
scaffolding structures will be required to allow people
to understand the visual impact.
Findings should be presented in Environmental Impact
Assessments, Design Statements or Landscape and
Visual Appraisals and follow the approaches set out
by the document ‘Guidelines for Landscape and Visual
Assessment’ (most recent edition).
This process should identify all the views within the
landscape or townscape from a range of distances and
orientations from the proposed development and take
into account how this will be viewed from particular
vantage points. These include hill tops, paths and
greenspaces, visual corridors along streets and roads,
bridges and residential neighbourhoods. See page
19 - 23 for technical information and requirements.
64

Page 59

12
Site appraisal
These drawings and images illustrate some of the ways a site can be appraised - in this case the gap site next to
the City Art Centre. Information like this helps build up an understanding of a site - it does not prescribe the way
it should be developed.
Views to site Buildings and routes
Gable windows
on art centre
Cockburn
Street
SiteMarket
Street
Station
Site
Vertical
emphasis to
windows
Variety of building
heights—generally falling
from east to west
Site sits within
herringbone pattern of
Old Town streets and
closes
00 50m50m
NN
Views to site from Princes
St Gardens, Roof of Princes
Mall & North Bridge
00 100m100m
NN
Prevailing
wind
Sun path  from east to west
00 50m50m
Site sheltered by
buildings to west
Site shaded by
tall buildings
to south, east
and west
Important nearby features Building heights and form
Microclimate
Site section
Technical guidance
65

Page 60

13
Historic Environment
Development should relate to the historic context in
terms of the following principles:
• New developments should be sensitive to historic
character and attain high standards in design,
construction and materials.
• New buildings should be designed for a long life
and soundly constructed of durable materials
chosen to suit their context. They should be
capable of alteration and adaptation in response to
changing needs in the future.
• Historic settlement patterns, plot boundaries,
pedestrian routes and enclosures should be
respected, as should the form, texture, grain and
general character of the site as a whole.
• Most of Edinburgh’s conservation areas have a
predominantly consistent design, or one which
is layered and made up of diverse components,
yet with an overall integrity. The consistent use
of a limited range of materials for roof coverings,
walls, ground surfaces, and for other elements and
details, can be vital to the integrity of an area.
• New developments which impact on either of
the two World Heritage Sites (WHS) should be
assessed against their impacts on their Outstanding
Universal Value.
• New buildings should be designed with due regard
to their site and surroundings using materials that
will weather and age well and settle into their place
in the townscape.
• Development should remain within the range of
heights of historic neighbouring properties.
• Facades should respond to the rhythm, scale and
proportion of neighbouring properties.
• Development should respect the established
building line.
• The density and architectural style of new
development should respect the scale, form and
grain of the historic context.
• Roof forms and materials should reflect the
tradition of the locality.
• The use of materials should respect and strengthen
local traditions, reflecting the naturally predominant
material.
• Traditional means of enclosure should be provided,
erecting either a wall sympathetic to the local
context or railings of an appropriate design.
• Development should retain significant gaps or
open spaces which contribute to the street scene or
provide the setting for buildings of architectural or
historic importance.
• Development should retain trees (and especially
mature trees) which contribute to the character of
the streetscape, backdrop and setting.
• In exceptional circumstances, where there is a
gap in a formal scheme, for example, it may be
appropriate to rebuild or build to a pre-existing or
reconstructed design.
In assessing whether or not unlisted buildings make
a positive contribution to the special architectural or
historic interest of a conservation area, the following
questions will be considered:
• Does the age, style, materials or any other
characteristics of the building reflect those of
a substantial number of other buildings in the
conservation area?
• Does it relate in age, style, materials or any other
historically significant way to adjacent historic
buildings and contribute positively to their setting?
• Does it reflect the development of the conservation
area?
• Does it have significant historic associations with
the established features such as the road layout or
traditional plot sizes?
• Does it have landmark quality?
• Does it reflect the traditional functional character of
the area?
• Does it have significant historic associations with
local people or past events?
Technical guidance
66

Page 61

14
Landscape Character
Technical checklist
Determine the relevant study area in relation to the proposed development. Agree
with planning authority.
Describe and categorise the surrounding landscape and townscape based on the
predominant topography, land use, eras of settlement and patterns of form, scale and
enclosure. Refer to existing sources of information as
necessary.
Identify sensitive receptors within the study area, such as designated sites, listed
buildings and scheduled sites, existing trees and woodland and describe key
characteristics of site.
Provide a succinct written appraisal assessing the landscape/townscape impact of
the proposal. Describe and evaluate change to character by considering how aspects
of the proposal relate to its surroundings
and whether change will weaken or enhance existing character. Where relevant
incorporate design mitigation
measures.
Additionally, designed landscapes will require a full Historic
Landscape Assessment.
A range of documents and techniques can be used when preparing
landscape character assessments
Technical guidance
Lothians Landscape Character Assessment (1998). Edinburgh Landscape
Character Assessment (2010)
Historic Scotland – Conservation Plans – A Guide to the Preparation of
Conservation Plans (2000)
67

Page 62

15
Visual Assessment
The Landscape Institute’s ‘Guidelines for Landscape
and Visual Impact Assessment’ sets out the
recognised approach. It should be read in conjunction
with the Landscape Institute Advice Note 01/11—
Photography and Photomontage in Landscape and
Visual Assessment and Visual Representation of
Wind Farms (Scottish Natural Heritage 2014).  Latest
guidance should also referred to including Landscape
Institute Technical Guidance Note 02/17 Visual
Representation of Development Proposals (March
2017) and Landscape Institute Technical Guidance
Note 2/19 Residential Visual Amenity Assessment
(March 2019). 
The visual assessment should be undertaken by a
chartered landscape architect.  An assessment of
city, local views and protected views will be required.
Views within any cultural heritage assessments or
assessments of setting should be undertaken by the
landscape architect in liaison with a suitably qualified
historic environment professional.  The assessment
of these views should be to the same standard as the
visual assessment. The requirements set out in the
technical checklist should be confirmed and agreed at
an early stage.
Technical checklist
Map the site’s visual envelope or prepare a computer generated Zone of Theoretical Visibility (ZTV).
Prepare a landscape and visual baseline report
Identify viewpoints representing different landscape and visual receptors, from a range of distances and orientations
from the proposed development. There should be representative, illustrative and specific viewpoints.  Any relevant
protected views should be included.
Confirm the number of viewpoints and their location on a location plan and agree with the planning authority
Prepare baseline site photography using equivalent of a 50mm focal length, usually set at 1.8m level (Photography to
comply with Landscape Institute Advice Note 01/11). All views should be verified.
The methodology for assessing landscape effects and visual effects should be agreed with the Planning Authority
in advance.  So how the susceptibility, value and sensitivity of the receptors; size, scale, duration, reversibility and
magnitude of effects are to be judged needs to be clear from the outset.  
Present the proposals alongside baseline photography, by means of an accurately constructed 3d CAD model.  The
position, massing and height of all principle built elements (and any mitigation) should be clearly indicated using photo
wires, photomontages and fully rendered verifiable photomontages with accompanying annotation.  Any mitigation
proposals should also be shown.
‘Before’ and ‘after’ views should enable direct comparison in the field, and should, therefore, be printed at the
appropriate perspective, resolution and size with details recorded on the title block.
The assessment should consider a reasonable scenario of maximum effects (worse case situation) from the selected
viewpoints.  This should include winter views without leaf cover.  Night time views also to be considered. 
Two time frames should be included – immediately after completion of the development and approximately 15years later.
Provide a written appraisal assessing the landscape and visual effects of the proposal.  A final statement of likely
significant landscape effects and visual effects should be provided.  It is expected that any mitigation identified is
included within the finalised masterplan and is implemented.
Technical guidance
68

Page 63

16
Protecting new views
The view from Edinburgh Park Station towards Arthur’s Seat & the Castle (right) has similar
qualities to the view towards the Castle from Carrick Knowe railway footbridge. It should be
protected.
Limiting the height of buildings to maintain a view
The height of buildings in the Bio-Quarter has been limited to maintain views towards the
Edmonstone ridge. This helps to reinforce the landscape setting of the city by providing visual
containment contributing to the sense that Edinburgh is a compact city.
Protecting an incidental view
Although the glimpsed view to Edinburgh Castle from the West
Port is not a key view, care should be taken to protect it.
Zone of theoretical visibility
Use of computer generated mapping to
determine a site’s zone of theoretical visibility
i.e. the area across which a proposed
development may have an effect on visual
amenity, can inform the selection of viewpoints
for visual assessment.
Technical guidance
69

Page 64

17
1.2   City skyline, tall buildings and protected views
Conserve the city’s skyline, by protecting views to
landmark buildings and topographical features.
Protect the setting of the Forth Bridge by protecting
the characteristics of the key views.
Identify, analyse and retain other important views in
relation to new development.
Local Development Plan policies
• Des 4 - Development Design
• Des 11 - Tall Buildings
• Env 1 - World Heritage Sites
The topography of Edinburgh has shaped the way the
city has evolved. The setting of the city, between the
open hills and the Firth of Forth, and the impact of
volcanic hills and ridges which define the built form,
create a very strong sense of place. This establishes
views to and from many key features around the city
and allows the city to be defined by its topography
rather than the height of its buildings.
The way buildings have used the topography of the
city also defines what is special about Edinburgh; with
the distinctive and contrasting patterns of the Old and
New Town recognised through the World Heritage Site
status. In order to protect this aspect of Edinburgh’s
character, the city’s most striking visual features and
views to them from a number of public vantage points
have been identified. The landmark features which are
to be protected include:
Protected skyline view of Calton Hill from west escarpment of Long Row, Whinny Hill (view no. E05)
• The Castle, Castle Rock and Tolbooth St John’s Spire.
• Calton Hill.
• The Old Town spine.
• Arthur’s Seat and the Crags.
• The New Town.
• Coastal backdrop and Firth of Forth.
• Open Hills.
• The Forth Bridges.
• St Mary’s Cathedral Spires.
• Fettes College.
• Craigmillar Castle.
Detailed guidance on protecting views of these
landmark features is in Appendix C.
One mechanism for protecting the views has evolved
from a study of views and skylines undertaken for the
Council. Essential to implementing the guidance is
an understanding of the concept of ‘sky space’. Sky
space is the space around the city’s landmark features
that will protect their integrity. Once the sky space is
‘pierced’ by a development, it has started to impact
on a protected view. Although there is a general
presumption against breaking the sky space, if a
development can demonstrate that it adds to the city’s
skyline in a positive way and enhances the character
of the city, it will be supported subject to it meeting
other relevant policy considerations. It should also be
noted that a development can have an adverse effect
on the skyline, not by breaking the sky space, but
through being too large in its built form or by failing
to recognise the importance of rooftop detailing and
modulation. Technical guidance is provided on the
following page.
70

Page 65

18
Forth Bridge World Heritage Site
The Forth Bridge and its setting are also recognised
as creating a very strong sense of place. The Bridge
was inscribed as a World Heritage Site in July 2015,
reflecting the innovation in engineering, construction
and materials used to create the iconic structure,
which remains in its original use. The scale and
power of the Forth Bridge creates a visually dominant
landmark and a number of designations around the
bridge ensure that it is protected at an appropriate
level.
To help further safeguard its setting, a viewshed
analysis identified a total of 10 key views; four of
which lie within the City of Edinburgh. The protection
of these key views and their characteristics will be
a key planning consideration. More information on
the key viewpoints within the City of Edinburgh area
is in ‘The Forth Bridge World Heritage Site: Key
Viewpoints’ document.
In general, development in the North West and
particularly in and around Queensferry and Port Edgar
must take into account any possible impacts on the
Forth Bridge.
The four views of the Forth Bridge from within the City
of Edinburgh boundary are:
• 4 Mons Hill;
• 5 Dalmeny Water Tower;
• 6 Bankhead, Dalmeny; and
• 7 Contact and Education Centre.
Click on the map arrows to reveal further details of the
viewpoint.
Reproduced by permission of Ordnance Survey on behalf of HMSO. Crown Copyright and database right 2013. All rights reserved. Ordnance Survey Licence Number 100023420.
4
56
7
8
9
10
1
2
3
Other important views
It is important that other views to landmark features
and important views to landscape and built features,
including statues and monuments, in and around the
city are also protected.
New views can be incorporated within new
development.
The following pages set out the Council’s expectations
for incorporating existing views.
Tall buildings
Edinburgh’s skyline is composed of tall slender,
elegant objects which when viewed against the
topography, give the city its unique character and
identity. Any proposed tall structure will have to
emulate these attributes in terms of slenderness,
proportions and elegance. This is to ensure that they
could be viewed as complementary to the existing
situation.
Proposals for higher buildings will need to take into
account the scale of surrounding buildings as well
as their potential impact on protected views. More
guidance on height and form is provided in section 2.1
on page 44.
71

Page 66

19
Assessing the impact on key views
The bottom of the sky space can be measured and is
calculated from Ordnance Datum, so once the height
of any proposed development is known, it will be
possible to assess its impact on any feature in the city
by the extent to which it pierces the bottom of the sky
space.
Each feature listed has different sky space around it
depending on the nature of the feature. The amount
of sky space around a feature will be sufficient, not
just to protect a view of the feature, but to protect
its context or setting. In some cases, the sky space
can be accurately defined, whilst in others, it will be
more of a matter of judgement. Views to the landmark
features from any key view are in the form of view
cones. The diagram to the right illustrates how view
cones take account of topography and how proposals
in different parts of the view cone might impact on a
particular view.
Impacts on key views will vary depending on the
nature of what needs to be protected in the key view
itself, the location of the proposal and its height and
form. Explaining in detail all circumstances in which
the key views can be affected is beyond the scope
of this guidance. However, it is possible to highlight
some issues;
• Some areas are more sensitive to even small
increases in height in relation to existing
development due to their prominence in key views
and exposure to sky space. An example of this is
development in the area between Princes Street
and Queen Street, where even the addition of an
extra storey could impact upon views.
• In other areas, there may be scope for taller
buildings but care needs to be taken that impacts
on key views are fully considered. For example,
some parts of the Port of Leith may have the
capacity for buildings that will exceed building
heights typical of the immediate context. However,
these areas may be very near parts of the docks
within which similar development could have an
adverse effect. An assessment of the suitability
of these or any other proposed locations for high
buildings, in terms of their contribution to the
strategic development of the city, will be required.
View information sheet
Each key view is referenced and has an associated
information sheet which sets out the parameters of
the view cone and includes a photograph of the view
being protected.
Key views that are to be protected are set out on
the following pages, click on the links to view the
information sheet. The key views are to be kept under
review.
Technical guidance
View information sheet
A1
A2
A1A1
B
C
D
E
CITY OF EDINBURGH  SKYLINE STUDY  February 2009  
Reference point Estimated height mAOD Notes
view A1 122 G L lower level north rampart
A2 133 G L upper level north rampart
skyline B 90 significant base of wooded hill below Monuments
C 90
backdrop D steep downward sightline, particularly from upper ramparts, brings shoreline into
view beyond Calton Hill on either side, to north beyond Balmoral hotel tower; hill
screens sea from central part of backdrop, but sight line is downwardsE
Calton Hill from the Castle ramparts  View No. C1a  
72

Page 67

20 73

Page 68

21
List of Protected Skyline Views in the North of the City
N1a  Carrington Road - Arthur’s Seat
N1b  Carrington Road - Charlotte Square dome, Castle & Hub spire
N2a  Inverleith Park - Arthur’s Seat
N2b  Inverleith Park - Charlotte Square dome, Castle & Hub spire
N2c  Botanic Gardens, west gate - along Arboretum Place to Castle
N2d  Inverleith Park - St Mary’s spires and west Edinburgh skyline
N3a  Botanic Gardens - Arthur’s Seat
N3b  Botanic Gardens, in front of Inverleith House - Castle, Hub spire
and Charlotte Square dome
N3c  Botanic Gardens - Pentland Hills
N3d  Botanic Gardens, in front of Inverleith House - St Mary’s spires
N4a  Eildon Road - Arthur’s Seat
N4b  South Fort Street - Salisbury Crags
N4c  Newhaven Road and Warriston Path - Calton Hill
N5a  Pilrig Park and Pilrig Street - Arthur’s Street
N5b  Pilrig Park - Calton Hill
N6a  Ferry Road & Merchant Maiden Playing fields - Arthur’s Seat
N6b  Ferry Road at Merchant Maiden Playing Fields - Castle, Hub spire
and Charlotte Square dome
N6c  Ferry Road at Merchant Maiden Playing Fields - St Mary’s spires
N7a  Ferry Road at Goldenacre - Arthur’s Seat
N7b  Ferry Road at Goldenacre - Salisbury Crags
N7c  Ferry Road at Goldenacre - Pentland Hills
N7d  Ferry Road at Goldenacre - St Marys’ spires
N7e  Ferry Road opposite Clark Road and Eildon Street - Castle and Old
Town skyline
N8  Newhaven Road and Victoria Park - Arthur’s Seat
N9  Constitution Street, north end - Calton Hill monuments
N10a  Inchkeith Island, Arthur’s Seat - Arthur’s Seat, Inchkeith Island
N10b  Leith Docks - Calton Hill
N11a  Leith Docks - Arthur’s Seat
N11b  Leith Docks - Calton Hill and Hub spire
N12a  Leith Docks, west end - Castle and Hub spire
N12b  Leith Docks, west end - Forth Bridge
List of Protected Skyline Views in the West of the City
W1a  Western Approach Road raised bridge - St Mary’s spires
W1b  Western Approach Road raised bridge - Castle
W1c  Western Approach Road raised bridge - Arthur’s Seat
W2a  Queensferry Road, west of Craigleith Road junction - Castle and
Arthur’s Seat
W2b  Queensferry Road, west of Craigleith Road junction - St Mary’s
spires
W3a  Telford Road, east of old railway bridge - Arthur’s Seat
W3b  Telford Road, near old railway bridge - Castle and Hub spire
W3c  Telford Road, old railway bridge - St Mary’s spires
W3d  Telford Road - Pentland Hills
W4a  Corstorphine Hill - Calton Hill and New Town Monuments
W4b  Corstorphine Hill, south east end - Castle and Arthur’s Seat
W5  Corstorphine Road, south of Zoo - Castle & St Mary’s spires
W6a  Carrick Knowe railway footbridge - Corstorphine Hill
W6b  Carrick Knowe railway footbridge - St Mary’s spires
W6c  Carrick Knowe railway footbridge - Castle
W6d  Carrick Knowe railway footbridge - Arthur’s Seat
W6e  Carrick Knowe - Pentland Hills
W7a  Saughton Road south of railway bridge
W7b  Saughton Road, south of railway - Castle and Hub spire
W7c  Playing field east of Broomhouse Community Centre - Arthur’s
Seat
W8  Longstone - Pentland Hills
W9  Sighthill and Broomhouse - Pentland Hills
W10  Cramond foreshore looking east
List of Protected Skyline Views in the East of the City
E1a  Pleasance - Salisbury Crags
E1b  Pleasance Calton Hill
E2a  Salisbury Crags, south side - Pentland Hills
E2b  Salisbury Crags, Radical Road - St Mary’s spires, Castle, Hub spire
E2c  Salisbury Crags, Radical Road - Corstorphine Hill
E2d  Salisbury Crags, Radical Road - Calton Hill
E3  Queen’s Drive - Calton Hill
E4a  Queen’s Drive, Powderhouse Corner - St Mary’s spires
E4b  Queen’s Drive, Powderhouse Corner - Castle and Hub spire
E5  Holyrood Park, Whinny Hill, Lonw Row - Calton Hill
E6a  Holyrood Park, Meadowbank Lawn - Castle and Old Town
E6b  Holyrood Park, St Anthony’s Chapel - Castle and Old Town
E6c  Holyrood Park, Meadowbank Lawn and St Anthony’s Chapel -
Calton Hill
E7a  Holyrood Park, Dunsapie Loch - the sea
E7b  Holyrood Park, Dunsapie Loch - Inchkeith Island
E8  London Road, Meadowbank - Calton Hill
E9a  Lochend Park, upper level and Lochend Road South - Arthur’s
Seat
E9b  Lochend Park - Arthur’s Seat and Salisbury Crags
E9c  Lochend Park, upper level - Calton Hill
E10  Easter Road - Salisbury Crags
E11  Seafield Road, Craigentinny - Arthur’s Seat
E12  Magdalene Field - Arthur’s Seat
List of Protected Skyline Views in the South of the City
S1a  Bruntsfield Place - Castle
S1b  Bruntsfield Links, south side - Castle
S1c  Bruntsfield Links and Meadows - Arthur’s Seat & Salisbury Crags
S2a  Blackford Hill crest - Castle, spires and Firth of Forth
S2b  Blackford Hill, Royal Observatory - Castle, spires & Firth of Forth
S2c  Blackford Hill - the sea with Inchkeith Island
S2d  Blackford Hill - Arthur’s Seat and Salisbury Crags
S2e  Midmar Drive - Arthur’s Seat and Salisbury Crags
S2f  Blackford Hill Crest - Corstorphine Hill
S3  Colinton Road - St Mary’s spires
S4a  Craiglockhart Hills - St Mary’s spires
S4b  Wester and Easter Craiglockhart Hills - Castle and Hub spire
S4c  Wester Craiglockhart Hill - Salisbury Crags
S4d  Wester Craiglockhart Hill - Arthur’s Seat and sea
S4e  Craiglockhart Hills - Pentland Hills
S5  Braidburn Valey Pentland Hills
S6  Braid Hills Drive West - Castle, Hub spire & Barclay Church spire
S7a  Braid Hills Drive East - Castle, Hub spire & distant mountains
S7b  Braid Hills Drive, east end - Calton Hill
S7c  Braid Hills Drive, east end - the sea
S7d  Braid Hills Drive, east end - Arthur’s Seat and Salisbury Crags
S7e  Braid Hills Drive, east end - Pentland Hills
S8a  Buckstone Snab - Castle, Firth of Forth and distant hills
S8b  Buckstone Snab - the sea
S8c  Buckstone Snab - Arthur’s Seat
S8d  Buckstone Snab - Corstorphine Hill
S9  Liberton Drive along Alnwick Hill Road to Arthur’s Seat
S10a  Liberton Cemetery - Arthur’s Seat and Salisbury Crags
S10b  Junction of Liberton Brae and Kirkgate - Castle
S11a  Old Dalkeith Road, by Craigmillar Castle - Castle
S11b  Old Dalkeith Road, by Cameron Toll - Salisbury Crags
S11c  Old Dalkeith Road, south of Cameron Toll - Arthur’s Seat and
Salisbury Crags
S12a  Craigmillar Castle - Inchkeith Island
S12b  Craigmillar Castle, upper battlements - Castle and Hub spire
S12c  Craigmillar Castle - Salisbury Crags
S12d  Craigmillar Castle - Arthur’s Seat
S13a  Lanark Road, Dovecot Park - St Mary’s spires
S13b  Lanark Road, Dovecot Park - Castle and Hub spire
S14a  Clovenstone Community Woodlands - Corstorphine Hill
S14b  Clovenstone Community Woodlands, west side - St Mary’s spires
S14c  Clovenstone Community Woodlands, west side - Castle and Hub
spire
S14d  Clovenstone Community Woodlands - Pentland Hills
S15  Captain’s Road - Pentland Hills
S16a  Hyvots Bank, Gilmerton Dykes - Castle and Hub spire
S16b  Gilmerton Dykes Street - Arthur’s Seat and Salisbury Crags
S17a  Gilmerton Road, near junction with Ferniehill Road - Castle and
Hub spire
S17b  Gilmerton Road - Salisbury Crags
S17c Gilmerton Road - Arthur’s Seat
S18a  Junction of Old Dalkeith Road and Ferniehill Road and Moredun
Park Road - Castle and Hub spire
S18b  Moredun Park Road - Arthur’s Seat and Salisbury Crags
S18c  Ferniehill Road, east end - Pentland Hills
S19  A68, near Wester Cowden - Castle, Hub spire and Old Town
S20  A68, near Wester Cowden - Arthur’s Seat
Technical guidance
74

Page 69

22
List of Protected Skyline Views in and around the City
Centre
C1a  Castle Ramparts - Calton Hill
C1b  Castle Ramparts - Inchkeith Island
C1c  Castle Ramparts - Arthur’s Seat
C1d  Castle Ramparts - Pentland Hills
C2a  Camera Obscura - Calton Hill
C2b  Camera Obscura and Castle Esplanade - Pentland Hills
C2c  Junction of Ramsay Lane and Castlehill - Firth of Forth
C3a  North Bank Street - Corstorphine Hill
C3b  Milne’s Close - Firth of Forth
C4a  Royal Mile, Lawnmarket - the sea
C4b  Royal Mile, North/South Bridge junction - the sea
C5a  North Bridge - Calton Hill
C5b  North Bridge - Firth of Forth
C5c  North Bridge - Salisbury Crags
C6  Jeffrey Street and Cranston Street - Calton Burial Ground
monuments
C7a  Waterloo Place and Regent Terrace - Arthur’s Seat and Salisbury
Crags
C7b  Carlton Terrace Tron spire - along Regent Terrace
C7c  Royal Terrace, east end - Greenside church tower
C8a  Calton Hill - Arthur’s Seat and Salisbury Crags
C8b  Calton Hill - Pentlend Hills
C8c  Calton Hill - Castle, Hub spire, St Giles crown and Tron spire
C8d  Calton Hill - along Princes Street
C9  Waterloo Place and Princes Street - St Mary’s spires
C11a  Junction of Queen Street and North Castle Street - east along
Queen Street
C11b  Junction of Queen Street and Dublin Street - west along Queen
Street
C11c  Dublin Street - east along Albany Street
C11d  Junction of George Street and Frederick Street - east to St
Andrew Square column
C11e  Junction of George Street and Frederick Street - west along
George Street
C12  East half of George Street - Firth of Forth Central
C13  George Street at Charlotte Square - Firth of Forth
C14  Princes Street - Calton Hill
C15  Queensferry Street - along Melville Street to St Mary’s spires
C16a  Dean Bridge - north to Rhema church tower
C16b  Dean Bridge - Firth of Forth
C16c  Dean Bridge south-west view
C16d  Dean Bridge - Corstorphine Hill and Dean Gallery towers
C17  West Maitland Street - along Palmerson Place
C18  Queensferry - Road Fettes College
Technical guidance
75

Page 70

23
Tall Buildings
The design of any high building will be of exceptional
quality and it must demonstrate an understanding
of its context and impact. This should be presented
in a townscape and visual impact assessment. The
application should be accompanied by:
• Level information (AOD ground levels and proposed
heights);
• An analysis of the context including a strategic
justification for the proposed location;
• Environmental modelling that addresses pedestrian
wind safety issues related to;
- Wind force (relative velocities related to a base
line study of surrounding area).
- Wind safety (turbulence, suction, lift).
- Thermal comfort (Wind chill).
- Noise level.
- Air quality.
- Streetscape aesthetics (impact of any mitigating
measures).
• Photomontages showing the impact of the proposal
on key views.
• A helium balloon test may be required, where
the true height of the building is described by a
series of markers attached to a cable suspended
by a balloon filled with helium, so that a true
understanding of the impact on the surrounding
area can be gained.
• A statement demonstrating that there is an
understanding of the impact of the development
and showing how the development enhances its
context.
The concept of view cones and sky space
This diagram shows that depending on a building’s position, its height and the topography surrounding, elements of a development
(shown in red) can impact on the sky space around a landmark building or feature. Note that the sky space sits to the side, above and
below the landmark feature.
Technical guidance
76

Page 71

24
1.3   Assessments and statement
Design and Access Statements are expected for
all major planning applications as well as other
significant or complex proposals.
Design statements are expected for some local
planning applications.
An Environmental Impact Assessment (EIA) will
be required for applications with significant
environmental impacts.
Landscape and visual Appraisal/Assessments will
be required for most applications. The extent of
the assessment will be dependent on the scale and
location of the development.
A Conservation Plan, Historic Landscape Assessment
and Assessment of the Setting of Listed Buildings,
or Assessment on the Outstanding Universal Value
(OUV) of a World Heritage Site will be required when
proposals include the historic environment.
Local Development Plan policies
• Des 1 - Design Quality and Context
• Env1 - World Heritage Sites
• Env 6 - Conservation Areas
• Env 7 - Historic Gardens and Designed Landscapes
• Env 8 - Protection of Important Remains
All development should communicate the visual and
landscape/townscape change by the use of appraisals
or assessments. The appraisal required depends on
the scale and context of the change. In certain local
applications this will be a stand alone document, in
other cases this assessment will be within a design
statement. Where Design and Access Statements
are required the landscape and visual information
should normally be in a stand alone document. For
development with a significant visual or landscape/
environmental impact, the findings should be
presented in an Environmental Impact Assessment.
The appraisal should show existing views, and
existing natural and built features. Sections 1.6, 1.7
and 1.8 set out the Council’s expectations for these
matters.
Key townscape principles, such as height, form, scale,
spatial structure and use of materials are set out in
the Designing Buildings chapter.
The different appraisals include:
Design Statements
Design statements are required for local
developments in the following areas:
• the World Heritage Sites;
• a conservation area;
• a historic garden or designed landscape;
• the site of a scheduled ancient monument; and
• the curtilage of a category ‘A’ listed building.
Design Statements are not required for:
• development of existing dwelling houses;
• changes of use; and
• applications for planning permission in principle.
Planning Advice Note (PAN) 68 - Design Statements
shows how to prepare a design statement. Key
headings are set out in the table overleaf.
77

Page 72

25
Design and Access Statements
Design and Access Statements will be expected for
all major planning applications as well as complex or
significant local planning applications.
The Design and Access Statements are the same
as a Design Statement except that they include a
section about how issues relating to access to the
development for people with disabilities have been
addressed. The statement must explain the policy
or approach in relation to adopted access. The table
below sets out the requirements.
Information required in a Design Statement
Background information Name of scheme; Name of applicant; Name of
architect/developer/urban designers/ etc. Description
of client brief; Date.
Site details Location and site plan; Description; History including
planning history; Ownership.
Site and area appraisals See section 1.1
Policy context Relationship of proposal to national and local planning
policies and guidance.
Public involvement Outcome of consultation and public involvement.
Programme How will the project be phased?
Concept Diagrams illustrating key concepts and ideas that
underpin the proposal.
Design solution An explanation of the design solution, including site
layout and parking provisions, and how the solution
has taken account of factors above, including, site and
area appraisal, policy context, public involvement and
concept.
Information required in an Access Statement
Policies It must explain how policies relating to access in the Local Development
Plan have been taken into account.
Specific issues Identify specific issues which might affect access to the development
for disabled people. This should explain how the applicant’s policy /
approach adopted in relation to access fits into the design process.
Access to and
through the site
Developers should consider setting out in the statement how access
arrangements make provision both to and through the site to ensure
users have equal and convenient access.
Maintenance It must describe how features which ensure access to the development
for disabled people will be maintained. The publication Designing
Places notes that the arrangements for long-term management and
maintenance are as important as the actual design. Therefore, issues
regarding maintenance will help inform the planning authority in coming
to a view on how best, possibly through agreements or conditions, such
features are to be maintained in the long term.
Consultation It must state what, if any, consultation has been undertaken on issues
relating to access to the development for disabled people and what
account has been taken of the outcome of any such consultation.
The Edinburgh Access Panel advises on how to
improve accessibility for people with disabilities in the
built environment. Its advice should be sought early in
the design process.
Proposals within a WHS will require an assessment.
The extent of this should be agreed with the planning
authority, however it will usually be within an EIA
for large complex developments. Views presented
to explain impacts on the Outstanding Universal
Values should follow the guidance in section 1.1 visual
assessment.
Sites which contain listed buildings will require an
assessment of the setting of the listed building.
This should include an assessment of the landscape
setting if appropriate, identifying key characteristics
and views that create the character and define the
setting. This should be presented following Historic
Environment Scotland’s advice. The location of the
assessment should be agreed with the Planning
Authority. Section 1.1 sets out the Council’s
expectations for positioning new development within
historic sites.
For sites listed in Historic Scotland’s national
Inventory of Gardens and Designed Landscapes in
Scotland, or the Council’s local survey records, a
historic landscape assessment written by a chartered
landscape architect should be submitted.
Where a Conservation Plan is required these should
be written by an accredited Conservation Architect
or Architectural Historian and should set out the
important characteristics and evolution of the
buildings and the landscape.
78

Page 73

26
1.4   Coordinate development
• Have a comprehensive approach to development
and regeneration.
• Comply with development frameworks or master
plans that have been approved by the Council.
• Develop masterplans with urban designers/
landscape architects in a multi-disciplinary team.
• On larger sites, prepare and adhere to masterplans
that integrate with the surrounding network of
streets, spaces and services.
• On smaller sites, make connections to surrounding
streets and spaces.
Local Development Plan policiesLocal Development Plan policies
• Des 2 - Co-ordinated Development
• Des 3 - Development Design – Incorporating and
Enhancing Existing and Potential Features 
• Des 4 – Development Design – Impact on Setting
• Des 7 - Layout Design
• Des 9 – Urban Edge Development
A comprehensive approach to development is
important, if well designed and cohesive networks of
streets and spaces (including the green/blue network
(section 3.1) are to be created. This is particularly
important on sites which could be large enough to
become neighbourhoods in their own right. Where
appropriate the Council will develop Place Briefs in
consultation with local communities which will set
out key principles to inform the preparation of a
masterplan.
Where a master plan is prepared it must demonstrate
a sound understanding of key issues and
opportunities based on an analysis of the wider
site context, its setting and its history. In sensitive
settings, including urban edge development, this
analysis must include a heritage and/or landscape
appraisal that examines potential capacity for
development on the site and identifies measures
to avoid negative impact. The masterplan should
support the creation or expansion of integrated,
mixed-use neighbourhoods that combine residential,
employment, commercial and community uses
with easy access to facilities, services and good
public transport connections.  It must provide a
robust development framework for efficient land
use, connectivity, urban design, landscape/open
space design, built form, infrastructure and service
provision.
A comprehensive approach to development is
also important with smaller developments, where
there is a possibility that neighbouring sites will be
developed in the future. Applicants may be asked
to demonstrate sketch layouts of how neighbouring
sites could be developed. This will help ensure that
the future development of neighbouring sites is not
compromised.
It is expected that proposals, including masterplans,
will comply with the principles in this guidance and be
prepared by a multidisciplinary team of consultants
including architects, urban designers, landscape
architects, flood engineers and historic environment
professionals. It requires that streets must consider
place before movement—a key part of establishing
suitable urban layouts. An important aspect of this is
to create streets and spaces that reflect the unique
character and distinctiveness of Edinburgh. The
Council wants new development to provide streets
and spaces that are attractive for all potential users of
them.
Opportunities for travel should be prioritised in
the order of walking, cycling, public transport, then
car, and should ensure equal access opportunities
for people with disabilities. Design considerations
should therefore reflect this user group hierarchy,
by giving particular focus to the individual needs
of pedestrians, cyclists and disabled people, while
avoiding a ‘one size fits all’ approach to design.
Maintaining development potential
This new tenement housing
development will allow the
neighbouring land and buildings
including the drive through restaurant
to be redeveloped in a similar pattern. 
This will help create a cohesive
network of streets. 
79

Page 74

27
Waverley Station
Hunter Square
Parliament
Square
Calton Road Regent Road
HOUSING
OFFICES
North Bridge
Canongate
Jeffrey St.
High Street
Calton Hill
Monuments
HOTEL
MIXED USE
Public
Space
Public
Space
New
St.
St. John StreetSt. Maryʼs Street
Creating a masterplan and following it
The City of Edinburgh Council masterplan for
Caltongate published in 2006 is reaching the last
stages of development with new office space, hotels,
restaurants, and public spaces all having been built
and new housing currently under construction.
The masterplan set principles for heights, roofscape,
views and vistas to respond to the sensitive built
heritage of Edinburgh’s Old Town and included
detailed guidance on new public spaces to be created.
The resulting development is a modern response
which sits successfully within the historically
important setting with new streets and public spaces
which knit well into the traditional pattern of vennels
and squares.
New public realm and link created between Canongate and Calton Road (the building on the
right is still under construction).
The City of Edinburgh Council masterplan for Caltongate
80

Page 75

28
Shared surface for new student housing—Boroughloch
Because there is very little need for car parking and, therefore,
access for cars, this development was able to be designed around
a shared surface street.  Due to the limited amount of vehicles and
the fact it is well overlooked, it is attractive for pedestrians and
cyclists.
Bridge for pedestrians and cyclists—Westfield Avenue
This new bridge connects the development to the Water of Leith
Walkway and areas beyond.
Maps © Crown Copyright and database right 2012. All rights reserved. Ordnance Survey License number 100023420.
Making connections to roads and cycle routes
This development was built on the site of a former suburban
station. It makes connecdtions to the cycle route and the roads at
each end of it.
81

Page 76

29
Shared surface in housing—Cakemuir Gardens.
The houses come right up to the edge of the carriageway.  The
tight space that results means that motor vehicles have to move
around slowly. This helps make the space safe for pedestrians and
children playing.
Pedestrian route in the city centre—Multrees Walk
This shopping and office development creates an attractive street.
The shops and little square within it make it an interesting space
to pass through.  The Council will seek to make more routes like
this where opportunities arise.
Connections outside the city centre—Brandfield St.
An important new connection has been made through the former
brewery site.  It is made as accessible as possible by the inclusion
of the ramp.  Landscape and overlooking contribute to its
attractiveness.
Maps © Crown Copyright and database right 2012. All rights reserved. Ordnance Survey License number 100023420.
82

Page 77

30
1.5   Density
Increased density can be achieved on sites where the
surrounding density is lower provided that:
• there is a strong urban design rationale for the
increase in density; and
• the increased density would not have an adverse
impact on neighbouring amenity or valuable
natural heritage features.
Local Development Plan policies
• Hou 4 - Housing Density
High density development helps Edinburgh be a
compact and vibrant city. Having higher densities
allows land to be used more efficiently, helps
regeneration and minimises the amount of greenfield
land being taken for development. Higher densities
also help maintain the vitality and viability of local
services and facilities such as schools and local
shops, and encourage the effective provision of public
transport. They can also make the provision of district
heat networks more viable - helping to achieve targets
to decarbonise heat.
New development should achieve a density that is
appropriate to the immediate site conditions and to
the neighbourhood. This is particularly important in
Victorian and Edwardian villa areas. Here the form of
any new building and its positioning should reflect
the spatial characteristics, building forms and heights
within the area. Back-land development must be
designed to ensure that any proposed building is
subservient to surrounding buildings and it does not
have an adverse impact on spatial character.
The appropriateness of high density housing to a
particular site will depend on site context and on the
way in which the development addresses the issues of
open space (including impacts on landscape character
and trees), unit mix, daylight, sunlight, privacy,
outlook, house type, car parking requirements, waste
management and the design and site layout of the
development itself. Density should be a product of
design, rather than a determinant of design. Where
there is a failure to meet the Council’s expectations
in relation to these factors, this would indicate that
the proposed density is too high and that the quantity
of development on the site should be reduced or the
design re-configured.
Where appropriate, higher density low rise building
types like colony housing, or terraced housing could
be inserted into some low density/low rise areas
without adverse impact on amenity or character. There
can be a rationale for a modest increase in building
heights (and density) at nodes such as transport
intersections of arterial and other significant roads, as
the change in height can help signal the importance of
the location and assist navigation.
High density development is encouraged where there
is, or it is proposed to be, good access to a full range
of neighbourhood facilities, including immediate
access to the public transport network (i.e. within
500m of development). The map on the following
page illustrates where these areas are within
Edinburgh.
In new suburban developments, the Council
encourages the efficient use of land and a mix of
housing types. Introducing housing types such as
flats, colonies, four in a block, terraces, mews houses
and townhouses can help to increase densities on
sites that are otherwise designed for detached and
semi-detached housing.
Density in suburbia
In these examples, the street layout is similar. The left hand example has fewer houses and so is less dense. The Council encourages the
approach on the right hand side where there is a mix of terraced and semi detached houses. The right hand layout is more likely to help
sustain services such as shops and public transport since there will be more people to use them.
83

Page 78

31
Terraced housing—Wauchope Terrace
Terraced housing is one way of delivering houses with front doors
and back gardens that makes efficient use of land.
Mixing houses and flats—Fala Place
Having a mix of houses and flats helps to create a range of
dwelling types—which improves social sustainability—and makes
good use of land.
Flats in villa areas—Succoth Place
These flats integrate well into an existing villa area due to their
scale and refined architectural design.
84

Page 79

32
Public transport accessibility levels map
The public transport
accessibility level (PTAL) is
measured by taking account
of the distance from any
point to the nearest public
transport stop, and service
frequency at that stop. The
higher the score, the greater
the level of accessibility.
The map above should be
considered when identifying
opportunities for higher
density development. It can
be found on the Council’s
Local Development Plan
Interactive proposals map
by clicking accessibility
in the other information
section of the legend.
Density measurements
In order to ensure a consistent approach across the
city, built density will be measured as follows:
The density of dwellings per hectare is calculated
by dividing the number of dwellings on site by the
Development Site + Roads Area.
Development Site + Roads Area (Ha) – is measured to
middle of roads or other routes bounding the site.
Development Site Area (Ha) – the site boundary or
where applicable measured to heel of pavement.
Some parts of the site may not be considered to be
For more complex mixed use proposals density should
be expressed as gross floor area per hectare (GFA/
Ha). Land which is clearly identified for other uses as
part of the development (for instance land allocated
for a new school) should be excluded from the
calculation.
Gross Floor Area (GFA) (m2)—is measured to the
exterior surface of external walls and includes all
internal features e.g. stairs.
Other useful calculations:
Gross Building Footprint Area (Footprint) (m2) — the
Gross Floor Area of the ground floor.
Net Floor Area (m2) - the internal area of a building
measured to the interior surface of external walls
including internal walls and partitions but excluding
communal features such as stairs.
These measurements will allow a number of simple
calculations to be made which will allow comparisons
to be drawn with other developments within the city.
Examples using some of these density measures
follow. For these examples, car parking values were
simply determined by establishing how many cars
actually park on the relevant street. In relation to
perpendicular on-street parking, a value of 2.5m is
suggested, whilst for parallel parking, a length of 5m
is suggested to accommodate cars.
developable based on LDP policy. These areas should
be excluded from the development site area. Any
areas to be excluded should be listed.
Calculating the density of Mixed Use
Developments.
Discretion will be used when calculating the density
of mixed use developments, in some cases the area
of other uses may be considered insignificant (for
instance 2 small commercial units as part of 700
house development).
Technical guidance
85

Page 80

33
Marchmont tenements
99 Dwellings/ha
1.32 GFA/site area
0.33 Footprint/site area
4 Average number of storeys
0.8 Car parking/dwelling 170m2 GFA per car parking 
space
Lochrin Place tenements
164 Dwellings/ha
1.89 GFA/ ite area
0.35 Footprint/site area
5.3 Average number of storeys
1 Car parking/dwelling 115m2 GFA per car parking 
space
Maps © Crown Copyright and database right 2012. All rights reserved. Ordnance Survey License number 100023420.
Examples using some of these density measures follow. For these examples, car parking values were simply determined by
establishing how many cars actually park on the relevant street. In relation to perpendicular on-street parking, a value of
2.5m is suggested, whilst for parallel parking, a length of 5m is suggested to accommodate cars.
Stockbridge colonies
115 Dwellings/ha
0.96 GFA/site area
0.34 Footprint/site area
2.8 Average number of storeys
0.5 Car parking/dwelling 179m2 GFA per car parking 
space
Technical guidance
86

Page 81

34
Westfield 
172 Dwellings/ha
1.23 GFA/site area
0.24 Footprint/site area
5 Average number of storeys
0.4 Car parking/dwelling 165m2 GFA per car parking 
space
Margaret Rose Avenue 
23.6 Dwellings/ha
0.43 GFA/site area
0.20 Footprint/site area
2.1 Average number of storeys
1.7 Car parking/dwelling 106m2 GFA per car parking 
space
21st Century Homes - Gracemount 
69 Dwellings/ha
0.65 GFA/site area
0.23 Footprint/site area
2.9 Average number of storeys
0.8 Car parking/dwelling 119m2 GFA per car parking 
space
Maps © Crown Copyright and database right 2012. All rights reserved. Ordnance Survey License number 100023420.
Technical guidance
87

Page 82

35
1.6   Incorporate existing views
Where views to interesting or landmark features
exist, incorporate them into new development.
Local Development Plan policies
• Des 3 -   Development Design
• Des 4 -   Development Design
Incorporating views into new development helps to
create distinctive places which are connected to the
areas around them. This is particularly important in
public areas such as streets, squares and open space
and make it easier for people to navigate through
these spaces.
Sometimes a potential outward view of the wider
landscape/townscape might not be apparent on a
site, for example because there is a building in the
way.
Site analysis will help establish whether a new view
can be secured through redevelopment. If it can, it
should be incorporated into the design.
Private views are not generally protected through the
planning system.
Notwithstanding this, there are some circumstances
where views can be provided in new development
and will contribute positively to the amenity of the
scheme. Such circumstances include sites where
it is unlikely that the view can be interrupted by
subsequent development and where the view is to a
landmark feature.
The height and massing of buildings can have a
significant impact on views. The section on height and
form contains specific guidance on this matter.
View to Craigmillar Castle—Castlebrae Wynd
The street is lined up to create the view to the castle.
Publicly accessible view
A publicly accessible view to Edinburgh Castle was created from
the roof level of the Museum of Scotland.
Creating new views - Jackson’s Entry off Canongate
Views to Salisbury Crags are framed by the retained historic
buildings and the new development that resulted from the
masterplan.
88

Page 83

36
1.7   Incorporate natural and landscape features
Respond to existing variations in landform.
• Protect and incorporate existing trees that are
worthy of retention into the design of new open
spaces.
• Retain and incorporate other existing natural
features into the design to reinforce local identity,
landscape character, amenity and optimise value of
ecological networks.
• Address the coastal edge and watercourses
positively and protect flood plains.
• De-culvert watercourses and integrate them with
the site layout and function.
• Define the urban edge to conserve and enhance the
landscape setting and special character of the city.
Local Development Plan policies
• Des 3 - Development Design
• Des 7 - Layout Design
• Des 9 - Urban Edge Development
• Des 10 - Waterside Development
• Env 12 - Trees
• Env 21 - Flood Protection
Existing landscape features can contribute strongly
to the quality of new development making them
distinctive and providing landmarks which aid
navigation. The layout of proposals should integrate
these features into the design. The Council will take
particular interest in the retention of historic features
and existing habitat.
to achieve maturity and accommodate multi-user paths
and links to the wider countryside.  So they should be
designed as a shelterbelt/ green corridor and allow
for habitat connectivity through the site and to the
wider area. They therefore require to be of an adequate
width (at least 30-50m wide).  Ideally they should be
implemented in advance of any development to allow
for early establishment so they can provide visual
containment, shelter, active travel and biodiversity
enhancement as soon as practicable.
In some situations, where new residential and civic
architecture will enhance the townscape, or the urban
edge adjoins recreational facilities or greenspace, a
permeable edge of parkland trees and active travel
routes may be considered.
Topographical features such as ridges and valleys also
combine to provide natural barriers, which can help to
direct development to the most appropriate locations
whilst contributing to the setting and identity of the city.
Watercourses should be addressed positively by
incorporating them into accessible green/blue
networks, and ensuring security through natural
surveillance and appropriate design such as active
frontages.
Waterside sites can present a unique opportunity for
innovative design. Flooding issues should be fully
understood.
In some instances, public access is inappropriate in
some areas because of the need to protect wildlife
habitat. For example, the south side of the Union
Canal is of particular habitat value and care should
be taken to ensure protection of its biodiversity
value. Similarly, the biodiversity of the Water of Leith
benefits from a lack of public access to some of its
banks. In the redevelopment of sites along the Water
of Leith a 15m setback or substantial ecological
mitigation will be required to maintain the ecological
potential of this strategic blue/green network. (see
also section 3.1)
The design of the urban edge should form a clear
transition between the urban area and surrounding
countryside. The retention, enhancement and
integration of existing trees, shelterbelts and
hedgerows helps integrate development with the
character of the surrounding countryside and provide
opportunities to extend habitat networks (see section
3.5). Existing trees should be located in open space as
opposed to residential gardens.
Where suitable landscape features do not exist it may
be necessary to create a substantial woodland edge to
provide shelter and landscape structure. These should
allow the necessary space for native woodland habitat
Retaining trees
New mature trees were planted alongside this retained tree in the
Grassmarket.
89

Page 84

37
Integrating trees —Malta Terrace
Existing trees have been carefully integrated into this housing
development
Archaeological Interpretation
The archaeological remains of the Flodden Wall are below these
markings in the hard landscape of the Grassmarket.  Their
retention helps the understanding of the history of the city.
New connections—Westfield Avenue
As well as providing an attractive frontage to the Water of Leith,
this development provides a new footbridge over it.  This greatly
improves access within the area.
A soft edge between development and landscape
By creating ‘fingers’ of buildings, landscape can be brought into
the development, blurring the edge between the two.
A strong edge between development and landscape
Where development forms a strong urban edge it is important to
create an equally robust landscape edge. 
Frontage onto the Union Canal—Fountainbridge
As well as providing mooring space and so promoting the Canal’s
recreational use, the development at the end of the Canal provides
an attractive frontage with bars and restaurants facing onto it. 
90

Page 85

38
1.8   Incorporate existing buildings and built features
Incorporate existing buildings and boundary
elements (even if they are not listed or in a
conservation area) where they will contribute
positively to new development.
• Re-use elements from existing buildings,
particularly where there is a historical interest.
• Protect and enhance existing archaeology.
• The incorporation of existing built features
benefits place making , sustainability and provides
an identity for a development.
Local Development Plan policies
• Des 1 - Design Quality and Context
• Des 3 - Development Design
• Des 7 - Layout Design
• Des 8 - Public Realm and Landscape Design
• Env 8 - Protection of Important Remains
• Env 9 - Development of Sites of Archaeological
Significance
There is a strong presumption in favour of retaining
existing buildings which contribute to the special
interest of an area. However, the replacement of
individual buildings can sometimes be justified. The
redevelopment of buildings, which are considered
by their appearance and scale to be detrimental
to the character of the area, will be encouraged.
Development proposals will be assessed in relation
to:
• proposed mass, scale, design and materials of the
replacement building; and
• the extent to which the replacement building will
enhance the character and appearance of the street
scene.
Where there are known or suspected archaeological
remains within the landscape surveys, evaluation and
desk top studies should be carried out in consultation
with the Council’s Archaeological Service. The
evaluations may highlight features to be considered
in any design proposal and the formulation of future
mitigation strategies. In some cases this should be
explained by the use of interpretation or an enhanced
landscape setting. (see section 3.2 - Open Space)
Reusing an existing building—Edinburgh Printmakers Gallery
The shell of this building was transformed into a gallery.
Boundary walls in villa areas—Newbattle Terrace
Boundary walls are extremely important to the character and
appearance of villa areas.  The size and number of new openings to
them should be minimised. 
91

Page 86

39
Transforming a building’s use—Anderson Place
This bond building was transformed into flats.
Reusing building materials—Holyrood Road
Stone from the partially demolished Queensberry House was used
in the walls on the exterior of the Scottish Parliament.
Incorporating existing features and boundary walls—Leith Fort
Existing lodge buildings and perimeter walls preserve the heritage of the area and give
character to a new housing development.
92

Page 87

40
1.9   Incorporate Art in public spaces
• New public art works should match the quality of
existing works, and make a positive contribution
to the environment.
• The location, scale and in some cases the
materials of proposed new art works are the main
issue for the Planning Authority. The content of art
works is not subject to Planning control.
• Public art works which have fixed foundations
or are fixed to buildings will require planning
permission and/or listed building consent.
• A permit under Section 56 of the Roads (Scotland)
Act 1984 may be required for construction of art
works on any public road, footway or footpath. A
road safety audit may also be required.
• Early consultation on proposals is recommended.
Local Development Plan policies
• Des 8 - Public Realm and Landscape Design
Public art involves the placing of art and craft works in
areas which are in public use within the environment.
It can include building and landscaping related works
of art, fixed or free-standing, permanent or temporary.
It aims to integrate artists’ skills and creativity into the
environment.
Public art can enrich the appearance of an area, make
a positive contribution to its cultural and community
identity and act as a catalyst for wider improvement. 
It can encourage sustainable cultural and economic
Graham Fagan’s neon light drawings ‘A drama in time’ provide interest and illumination under the railway bridge
along Calton Road.
activity through the employment of artists, and reach
a public who may never have any other first-hand
contact with the arts.
An appreciation of existing public art works is an
essential basis for consideration of new proposals.
Edinburgh has a long history of using monuments and
civic statuary to mark important events and special
people. They tell us about the history of the city - like
a museum collection, but on display in the parks and
streets.
93

Page 88

41
Informative: Works providing a
public reference to specific sites,
in order to provide informative
interpretation of its relevance or
importance. Decorative wall plaques
or facades mounted sculptures are
the normal form for these.
Plaque at the entrance to Advocates Close
Entrance to Old Fishmarket Close
Functional: Elements in the urban
environment serving a functional
requirement which have functional
artistic qualities by their design,
materials and craftsmanship.
Statue of Greyfriars Bobby drinking fountain
for people and dogs
Bicycle stands outside the Scottish parliament
Aesthetic: Non-functional elements
which are intended directly to
enhance the urban aesthetic
environment.
Literary panel at middle Meadow Walk
Giraffes outside the OMNI Picardy Place
Mural by Shona Hardie – Candlemaker Row
Public art works can be divided into one or more of four categories:
Mortonhall baby ashes memorial - Princes
Street Gardens
Memorial to Wojtek the soldier bear – Princes
Street Gardens
Symbolic: Normally representing
civic, national or military events or
prominent individuals in the form
of bronze or stone statuary groups,
and commemorative monuments and
memorials.
94

Page 89

42
Council Approval
The approval of the owners of the land on which the
art work is proposed will be required. On most street
locations the owner will be the Council.
The Council will assist in identifying suitable location
for proposed public art. In considering granting
approval, as owners of the land, the contents of this
guideline will be used to assess proposals.
The content of public art is not subject to Planning
control, however, in the World Heritage Site it is a
requirement that they should celebrate events or
persons of generally accepted national importance. 
A period of five years should have elapsed from the
death of anyone proposed for commemoration by a
statue.
The Council will normally agree to accept the work
into public ownership, if a future maintenance
provision is agreed. Maintenance costs should
be calculated at about 15% of overall costs and
endowments for maintenance are accepted. Design
and materials used should demonstrate minimum
maintenance requirements, and resistance to theft
and vandalism.
Community Approval
The participation of the local community should
be encouraged at all stages of the project. Projects
will be more appropriate if they have some social
relevance or significance to the local community.
Location
The established architectural character and art work
tradition of an area are essential considerations
for the introduction of art works. Proposals will be
considered in terms of scale, form and road safety. In
some cases materials will also be considered. Projects
should be site specific and carefully integrated
with the building structure and the context of the
surrounding environment. Proposals should illustrate
a comprehensive understanding of site considerations
and the physical, social, historical, topographical and
architectural context.
New art works should not affect the character and
appearance of existing monuments or their setting in
terms their scale, form or content.
World Heritage Site Locations
There is a particular demand for new public art in the
Edinburgh Old and New Towns World Heritage Site.
The aims in World Heritage Site locations are that
public art should result in landmark structures of the
highest quality and make a positive contribution to
the outstanding universal value of the Site.
Quality
Projects should involve the highest aesthetic
standards, structural and surface durability,
innovation and  originality within the traditions of the
area. Design and materials should be of the highest
quality and give permanence to the artwork with little
or no maintenance required.
New Development
New developments, either architectural or
landscape, can provide opportunities for inclusion
of contemporary public art works. Art works should
be seen as an integral part of the project, with
experienced artists involved from the outset, in
conception and design.
Temporary Installations
Temporary moveable installations have no fixed
foundations (although they may be tied down as
a safety measure), and are displayed for a limited
period not exceeding 6 months.
Temporary installations will not normally require
Planning Permission. They should be designed to be
appropriately durable for the period of their display,
equal to the quality of permanent art works and
present no road safety risk.
Interventions on existing public art works are not
encouraged. Where considered appropriate, they will
be limited in time scale and should not result in any
possibility of damage to the existing art work.
Light installation – Teviot Place
Technical guidance
95

Page 90

43
2.  Designing places: buildings
The key aims are for new development to:
• Have a positive impact on the immediate surroundings; wider environment; landscape and views, through its height and form; scale and
proportions; materials and detailing; positioning of the buildings on site, integration of ancillary facilities; and the health and amenity of
occupiers.
• Repair the urban fabric, establish model forms of development and generate coherence and distinctiveness where the surrounding
development is fragmented or of poor quality.
• Achieve high standards of sustainability in building design, construction and use
• Be adaptable to future needs and climate change.
• Support social sustainability, by designing for different types of households.
• Address the street in a positive way to create or help to reinforce a the sense of place, urban vitality and community safety.
• Balance the needs of pedestrians, cyclists, public transport users and motorists effectively and minimise the impacts of car parking
through a design-led and place specific approach.
• Reduce exposure to pollution and where possible seek to reduce overall emissions.
This chapter sets out the Council’s expectations for how features within the built form relate to its setting. The overall
composition of streets is shaped by how individual buildings work together, creating the unique visual character
through repetition, variety and focal points within the street scene.
96

Page 91

44
2.1   Height and form
Match the general height and form of buildings
prevailing in the surrounding area.
Where new developments exceed the height of
neighbouring buildings ensure they enhance the
skyline and surrounding townscape.
Ensure new high buildings conform to the section 1.2
on City skyline, tall buildings and protected views.
Local Development Plan policies
• es 4a -Development Design
• Des 11 - Tall Buildings
The Council wants new development to integrate well
with existing buildings and spaces. This means new
buildings that are clearly higher than their neighbours
should be avoided. This helps protect the visual
character of areas where there are uniform building
heights. It also helps protect key views.
The height of the part of the building where the
external wall meets the roof (the eaves) is at least as
important to the perception of height as the height
of the top of the roof (the ridge). This means that
new buildings should sit within the form set by the
eaves and ridge of neighbouring buildings. This is
particularly important in situations where there are
established building heights, for example tenement
streets, mews streets and villa areas.
Well designed architectural features that rise above
this height, and which would contribute to the visual
interest of the city’s streets and skyline and not
adversely affect key views, may be acceptable in
exceptional circumstances.
Existing high and intrusive buildings will not be
accepted as precedents for the future. They should be
replaced with more sensitively scaled buildings, when
their redevelopment is in prospect.
The impacts of height in relation to aerodrome safety
should be considered.
Roofscape
The topography of Edinburgh means that the roofs
of buildings are often viewed from above. The
articulation of the roofscape therefore needs to be
carefully considered. Plant infrastructure, particularly
at rooftop level, should be integrated into the roof
design and where rooftop plant is provided, edge
protection railings should be avoided.
New hotel Market Street
The roof of this hotel has been articulated to reflect the form of the
roofscape behind it.
The right height—Fountainbridge
The height of the modern building is very similar to its historic
neighbour. This helps it integrate with its surroundings.
Too low—Pitt Street
This recent development above could have been improved if its
eaves height had matched those of it neighbours.  The effect is
that the building appears too small.
97

Page 92

45
Impact on distant city views – development should not detract
from Edinburgh’s beautiful skyline
Avoid tall, large, square/ rectangular buildings with flat horizontal
rooflines as these are very conspicuous.  Instead building height
and mass should respect the city’s townscape.  Roof articulation
helps to break up built mass and is encouraged.  Building
materials and colours also need to be chosen with care.  White
colours and reflective materials are very noticeable in distant
views whereas muted colours blend into the landscape much
better (also refer to Section 2.7).
Matching the height of existing mews—Circus Lane
This newly built house matches the eaves and ridge heights of the
adjacent historic mews buildings.
Integrating into a street and key view
The set back of the upper floors and the materials chosen help
integrate the buildings in the centre of the image into view from
the Castle Esplanade. 
Matching heights in villa areas
It is important that new buildings in villa areas have similar heights
to their neighbours.  In this example, the modern building in the
middle of the image is designed so that the height of its main walls
matches the eaves heights of the buildings on both sides.
A landmark for the wrong reasons—Walker Street
The office tower has a negative impact on views from surrounding
streets due to its inharmonious height & form. 
Villa—Merchiston Park
The height and massing of this villa, which are similar to surrounding
buildings, help to integrate it.
98

Page 93

46
2.2   Scale and proportions
Harmonise the scale of buildings including their size
and form, windows and doors and other features
by making them a similar size to those of their
neighbours.
Where the scale of proposed new development is
different to that of surrounding buildings, ensure
there is a compelling reasoning for the difference.
Local Development Plan policies
• Des 4b - Development Design
• Des 11b - Tall Buildings
A typical example of a difference in scale being
problematic is where new tenements are located next
to older stone built tenements. Often the windows on
the new building are smaller and a different shape and
because the floor-to-floor heights are lower than the
older buildings there will be an extra row of windows.
This creates a visual mismatch that can erode the
character of the area.
Modern development with a similar scale—Wester Coates
Gardens
This villa has large windows which help to integrate it with the
scale of surrounding historic villas.  The proportions of stonework
help also.
Matching height, proportions and form—Hopetoun Crescent
The housing either side of the historic townhouses above has
been designed to match the scale originally intended for this
street.
Windows too small?
While five storey tenement has the same eaves height it has much
smaller windows than those  of neighbouring tenements.  The small
scale creates an inharmonious relationship. 
In sensitive sites, floor to floor heights of new
buildings should match their neighbours.
Where elevations have large projections or recesses,
three dimensional views may be sought so that the
scale and proportions can be assessed.
99

Page 94

47
2.3   Position of buildings on site
Position new buildings to line up with the building
lines of neighbouring buildings.
Where building lines do not exist, position new
development to engage positively with streets
and spaces and where the surrounding townscape
character of the area is good, it should be reflected
in the layout.
Use the positioning of buildings to create interesting
and attractive streets and spaces.
Where locating buildings in a historic landscape,
ensure the essential characteristics of the landscape
are protected.
When locating buildings adjacent or close to a
historic building ensure the key views to and from
the building and characteristics of the setting of the
historic building are protected.
Position buildings carefully with a full understanding
of the topography and environmental constraints
of adjacent spaces and the site, taking into account
orientation and exposure.  Undertake topographical
surveys to identify existing natural and built heritage
elements that could be retained and to consider
existing and proposed levels at an early stage.
Local Development Plan policies
• Des 4c - Development Design
In areas of the city where buildings do not line up (for
example the Old Town), plans of the wider context
are extremely useful in helping to determine how well
the proposed position of buildings on site is likely to
make a positive contribution to the spatial character
of an area.
Back-land development may be acceptable where it
would not disrupt the spatial character of the area
and the amenity of future residents, and residents of
adjacent properties. Proposals will be considered on
a case by case basis and will take into account the
cumulative impact of proposals in an area (including
the cumulative impact on surface water drainage and
biodiversity, including trees).
Layouts should be designed to be attractive for all
users and particularly pedestrians, cyclists and people
with disabilities.
Inserting buildings into the setting of listed buildings
must be done in such a way as to ensure principal
elevations of the listed building remain visible from
main viewpoints and the relationship of the listed
building and the street is not disrupted.
Inserting buildings into a historic landscape must
be done without upsetting the landscape integrity
and with an understanding of the sensitive views
and characteristics, and the setting of any historic
buildings, in order that these can be protected.
Landscape, visual and setting appraisals (section 1.1)
should be used to guide the process.
The orientation of buildings should inform internal
layouts to maximise the benefits of solar gain and
daylight and reduce energy demand. Building design
should also consider measures to mitigate impact
of summer overheating. Exposure and the need to
provide shelter should also influence the layout of
buildings.
100

Page 95

48
Rebuilding the urban fabric – Hopetoun Village:
New development (shown in red) has enhanced the urban fabric
of this formerly industrial area, taking cues from the tenements,
terraces and perimeter block form of the surrounding area and
creating a range of new places and spaces.
Infill development in a villa area:
The proposed building (shown in red) is roughly the same size in
plan as its neighbours and is positioned so that its frontage is the
same distance from the road as its immediate neighbours.
The wrong position
Positioning large buildings (coloured red) in the rear of villa plots
can undermine the spatial character of the area.
101

Page 96

49
Varied building positions—Cakemuir Gardens
Varying the positions of the buildings in relation to the street
helps create an interesting sequence of streets and spaces in the
development—contributing to its attractiveness as a whole.
Creating contrasting spaces
Positioning the flats and houses close together, provides space
for a green in the middle of the development.  This large space
creates an interesting contrast with the streets around.
Courtyards—Brighouse Park Gait
Small groups of housing can be made to form courtyards.
102

Page 97

50
15m wide street—Woolmet Place
By integrating the parking into the street and having small
front gardens, the street has been made narrower than a typical
suburban street.
A village green—Muirhouses Square, Bo’ness
The houses are arranged to form a space that is similar to a village
green. This can be used by residents for a range of uses and has
good visual amenity.
Space within a space—Dublin Street Lane North
The buildings are positioned to create a range of spaces that
contrast with the ordered streets of the New Town surrounding the
site.
Image courtesy of Steve Tiesdell Legacy Collection
103

Page 98

51
Mews street—Donnybrook Quarter, London
This development provides terraces at upper levels, allowing
relatively high density housing to come close together and achieve
good quality outdoor space
Image courtesy of Steve Tiesdell Legacy Collection
Ordered frontage to Canal—Amsterdam
These houses are arranged to provide an attractive frontage to
the Canal.  The moorings provided are set out to allow a relatively
continuous strip of habitat for wildlife.
Image courtesy of Steve Tiesdell Legacy Collection
Image © Tim Francey
A range of spaces—Accordia, Cambridge
In this development in Cambridge, the houses are placed to create
a mews street.  Its narrowness means that cars cannot be parked
in the street so garages have to be used.  This helps the street be
more pedestrian friendly and suitable for play.  The images above
right show some of the open space within the development.
Positioning trees carefully—Allerton Bywater, England
Trees are an integral part of this housing development, lining the
streets throughout the development.
Image courtesy of Steve Tiesdell Legacy Collection
Narrow street—Amsterdam
Pedestrians, cyclists and cars are all considered in this narrow
street.  A key feature are the climbing plants which add visual
softness.
Image courtesy of Steve Tiesdell Legacy Collection
104

Page 99

52
New suburban developments
In new suburban developments it will be expected that a variety
of different housing types will be provided and that these will be
laid out to give a variety of different types of streets and spaces. 
These should integrate with the hierarchy of the streets in the
surrounding area.  This layout shows that a range of different
streets and spaces can be created using similar housing types: 
squares (1), narrow streets with garages to the side (2) and mews
streets (3) can all be created with standardised house types.   
1 3
2
3 2
1
1
105

Page 100

53
2.4   Design, integration and quantity of parking
Welcoming, attractive and sustainable places
balance the needs of pedestrians, cyclists and
motorists effectively with priority given to creating
walkable and cycle friendly environments.
Proposals for parking within new developments
should be design-led and reflect the positive
characteristics of the place.
Car parking within new developments should not
visually dominate the streetscene.
On larger developments a range of parking solutions
should be explored that use land efficiently and are
set within a high quality public realm.
Pedestrian desire lines within and adjacent to the
site should be identified at the outset to inform
proposals which prioritise safe and convenient
pedestrian movement.
Safe, secure and convenient cycle and motorcycle
parking facilities should be provided as part of new
developments.
Electric vehicle charge points should be provided for
developments where 10 or more car parking spaces
are proposed.
Car club initiatives are encouraged to promote car
use as a shared resource and reduce pressure for
parking.
Local Development Plan policies
• Des 3 -   Development Design
• Des 4 -   Development Design
• Des 5 -   Development Design
• Des 6 -  Sustainable Buildings
• Des 7 -  Layout Design
• Des 8 -  Public Realm and Landscape Design
• Tra 1 - Location of Major Development
• Tra 2 -  Private Car Parking
• Tra 3 -  Private Cycle Parking
• Tra 4 -  Design of Off-Street Car and Cycle Parking
The design, integration and quantity of parking
associated with new development has a huge impact
on the quality of our places and the way we use them.
Proposals for new development should be design-led
and reflect the positive characteristics of the place
with an emphasis on creating walkable and cycle
friendly environments.
Car parking in new developments
Reducing the impact of the car will create more
sustainable, attractive places to live and will help to
address congestion, air pollution and noise.
The type, location and quantity of car parking in new
developments should be informed by the positive
characteristics of the place and its accessibility by foot
and bicycle to amenities and services, including public
transport.
Sites which are within highly accessible locations
close to amenities such as within the city centre or
town centres will require less, or in some cases zero,
car parking provision. It should be noted, however,
that this does not mean that zero car parking
provision will be acceptable in all cases - see page
61 ‘Parking Standards’ for more information.
In all new developments, car parking should be
designed to have a minimal visual impact on the
site and surrounding area. Large expanses of
uninterrupted car parking, particularly located to the
front of new developments, will not be acceptable as
they have an adverse visual impact and encourage
non-essential car trips. More detailed guidance on
parking design will be provided in a Street Design
Guide Factsheet (G9) which is due to be completed
during 2020.
Where car parking is required on larger developments,
a range of solutions that use land efficiently and are
well integrated within a high quality public realm
should be delivered. A number of these options are
explored in the following Technical guidance.
Residential development at Hopetoun Crescent respects the
character of the street and incorporates underground parking to
assist in minimising parking pressures on the surrounding area
106

Page 101

54
Exploring options for car parking in new
developments
High amenity residential areas generally have car
parking located on the street, set to the side or
concealed from public view within the site, such as
within underground or undercroft parking areas.
Many modern housing developments locate the car
in front of the dwelling thereby creating a streetscene
which is dominated by the car. This guidance seeks
to encourage sensitively located car parking and
facilitate high quality places for all users.
integral 
garage
5m5m
front garden
becomes car
park
Good examples of parking options within dwelling plots where dwellings are pushed forward to create defensible space
and avoid parking within the front garden
Poor example showing the dwelling pushed back with parking to
the front of the plot Dwellings at Redhall House Drive pushed forward on the plot with
strong boundary treatment and defensible space to the front
Semi detached plots example with parking to side & on street
parking in
side drive-
way
3m3m pedestrian/
cycle space
low boundary wall to
front gardens
on street
parking
3m3m defensible
space
optional single
garaging
Terraced plots example with parking to rear and on street
service
lane
optional
garaging
3m3m
pedestrian/
cycle space
defensible
space
3m3m
Technical guidance
107

Page 102

55
Alternative approaches
Alternative approaches to accommodating car parking
will be supported where hard and soft landscaping
creates defensible private space and helps create
high quality public realm, while minimising the visual
impact of car parking.
The use of integral garages and off-street parking to
the front of buildings should generally be avoided.
However, Grange Loan, Eyre Place and Wallace
Gardens illustrate successful approaches which
deliver high quality living environments including the
use of boundary treatment to form defensible space.
Where the use of integral garages is appropriate
such as within mews-style developments where they
are an established part of the character, they should
be designed so as not to over-dominate the front
elevation of the building or result in ‘dead frontages’.
The inclusion of windows within garage doors can also
assist activating the street frontage (see example at
Eyre Place).
Strong boundary treatment and landscaping define plots and
reduce the visual impact of parked cars at Wallace Gardens
Existing stone wall retained with parking area behind results in
minimal visual impact of parked cars at Malta Terrace
Good mews plots examples with integral garage / on street parking
garden
mews
roadspace
incorporating
parking
mews with
integral
single garaging
garden
Good mews plots examples with integral
garage/on street parking
Rear parking courtyards should be minimised unless
they are designed to help create well overlooked and
attractive amenity spaces. The position and quantity
of cars should not overdominate the space or reduce
its usability. The use of good quality boundary
treatments, landscaping and structures such as
garaging can help to avoid uninterrupted areas of
parking.
Lane with garaging and parking spaces to the rear of Brighouse
Park Cross
Mix of integral garages and on-street parking within the mews
development at Eyre Place
Technical guidance
108

Page 103

56
Use of underground, undercroft and rooftop
parking
Underground and undercroft parking should
be implemented for larger developments (ie
supermarkets and large residential sites) where
access ramps can be accommodated or topography
permits its use. This type of parking arrangement
allows buildings to be located forward on the plot
creating a more active street environment and
maximising space for amenity to the rear.
On larger developments, rooftop parking should
also be explored to maximise the efficient use of
space and avoid large areas of surface car parking
where underground or undercroft parking cannot be
delivered.
Rear courtyard parking within well overlooked landscaped
amenity space off Gayfield Square
undercroft parking mews
Good flatted development example with undercroft parking & mews to rear
basement
pedestrian/
cycle space
garden
roof garden/deck
3m3m
Rooftop car park for supermarket uses space efficiently and the
building fully activates corner position along Morningside Road
Zero parking provided within the site for this accessible town
centre retail unit on Raeburn Place
Technical guidance
Mixed use developments
For mixed use developments, parking areas should be
shared between the uses provided this works without
conflict, for example, where uses are populated
at different times of day. This arrangement should
therefore result in a reduction in the number of total
parking spaces.
109

Page 104

57
Open space and landscaping
Car parking should not be provided at the expense
of delivering open space required as a setting to
development.
External car parking should be enhanced by a
structure of tree and hedge planting arranged both
within the parking area and along its boundaries.
It is expected that the quantity of planting within
car parks will correspond to the number of parking
spaces. 50m2 of planting, incorporating four trees, is
required for every 20 car parking spaces, or 250m2 of
parking. For each 100 car spaces an additional 100m2
of planting will be required.
Where proposals justify larger areas of external car
parking, planting should be used to clarify pedestrian
and vehicular circulation and be subdivided into
compartments of 50-100 cars for ease or orientation.
Tree planting in car parks should preferably be
provided in linear trenches. If tree trenches are not
feasible, large treepits with underground support
structures to ensure robust growth of trees should
be incorporated. Accidental damage to planting by
vehicles should be avoided through careful siting and
design.
Parking spaces for people with disabilities
Under the Equality Act 2010 it is the responsibility of
site occupiers to ensure that adequate provision is
made for the needs of people with disabilities.
To ensure this, a proportion of all car parking
areas must be accessible for people with mobility
impairments, including wheelchair users (whether
driver or a passenger).
Accessible off-street parking spaces.
3600mm
5000mm min
5500mm max 600
500 DISABLED 350
600 min900 maxThis is achieved through a minimum accessible
parking requirement for all developments. Accessible
parking spaces should be created as part of the
overall car parking provision, and not in addition to it.
If it is known that there will be a disabled employee,
spaces should be provided in addition to the minimum
accessible parking requirement. A larger number of
spaces may be required at facilities where a high
proportion of disabled users/visitors will be expected,
for example health and care facilities.
Accessible parking should be designed so that drivers
and passengers, either of whom may be disabled, can
get in and out of the car easily and should be located
close to entrances with step-free access provided
between them. Transport Scotland’s Roads for All
guidance (section 4.5.8) provides design details for
off and on street parking bays. All road markings must
Woolmet Place - Inclusion of robust landscape with trees and
hedges helps to reduce the potentially negative visual impact of
the car parking area
be in accordance with Traffic Signs Regulations and
General Directions
For on-street accessible parking bays, in accordance
with the Disabled Persons’ Parking Places (Scotland)
Act 2009, developers are required to promote a Traffic
Regulation Order, so that use of such spaces can be
enforced by the Council. Developers are expected
to pay for the necessary road marking, signage and
Traffic Regulation Order costs.
110

Page 105

58
Parking spaces for bicycles
The Council is committed to increasing cycling’s share
of travel in the city in-line with the targets set-out
in the Active Travel Action Plan. High quality cycle
parking, including secure storage, is essential in
making cycling as attractive as possible.
Cycle parking should be considered in terms of two
provision types – long stay and short stay.
Long-stay parking will be required in residential
developments, nurseries/schools, further education
centres and places of employment, as cycles are
generally parked for long periods of the day. Focus
should, therefore, be on the location, security and
weather protection aspects of cycle parking design. It
is recommended that associated facilities, including
lockers, showers and changing rooms are provided at
land uses where long stay cyclists require them.
Short-stay parking should, as a minimum, serve all
other development types and should be available
for customers and other visitors. Short-stay parking
should be convenient and readily accessible,
preferably with step-free access and located close to
entrances.
In many cases there will be a requirement for both
long and short-stay provision to accommodate the
differing needs of employees, residents and students,
versus the requirements of customers or visitors to a
site.
Where it is not possible to provide suitable visitor
parking within the curtilage of a development or
in a suitable location in the vicinity agreed by the
Council, the Council at their discretion may instead
accept additional long-stay provision, or as a last
resort, contributions to provide cycle parking in an
appropriate location in the vicinity of the site. For
flatted developments, cycle parking should ideally be
integral to the buildings to avoid visual clutter in the
public realm and encroachment of green open space.
Where it is not possible to provide adequate cycle
parking within residential dwellings, the ‘Garages
and Outbuildings’ section of Council’s Guidance for
Householders should be referred to as it provides
links to practical cycle storage advice including on-
street and garden provision.
Developers should include details of on-site cycle
parking/storage on the relevant drawing(s) and early
consideration of the location and type of provision is
required to avoid retrofitting at the end of the design
process.
To ensure that cycle parking/storage is implemented,
developers are expected to specify where the
cycle parking/storage provision will be located (as
agreed with the Council) and that they will be fully
implemented prior to the operation or occupation
of the approved development. This should be
clearly stated on the relevant drawing(s) prior to the
determination of the application. Developers will
also be expected to set out how the facilities shall be
retained throughout the lifetime of the development.
All cycle parking should be consistent with the design
details set out in the forthcoming Technical Manual
factsheet ‘C.7 Cycle Parking in New Developments’
and should also reflect section 8.3 of Cycling by
Design which also details storage facilities.
Cycle hire facilities
A cycle hire scheme was launched in September 2018
and is being rolled out across the City. All major new
developments should consider the integration of cycle
hire points into the layout taking into account LDP
Policy Des 7.
Long stay cycle parking, Buccleuch Place Lane Student Housing
111

Page 106

59
Parking spaces for motorcycles
Parking provision for motorcycles is likely to be
in demand around educational establishments,
workplaces, shopping and leisure destinations,
and residential areas lacking in private car parking
opportunities. If the demand for motorcycle parking
is unmet, it may disincentivise motorcycling and will
potentially result in informal motorcycle parking.
This could prove hazardous to pedestrians by blocking
footways, and may also inconvenience cyclists if cycle
parking facilities are misused.
In terms of convenience, flexibility and security,
motorcyclist requirements are akin to cyclists, with
good practice design stating that motorcycle parking
provision associated with new developments should
be close by, clearly marked, secure and safe to use.
Sites should have anchor points, quality non-slip
level surfacing, CCTV and/or natural surveillance.
They should be located away from drain gratings and
protected from the elements, as well as having good
lighting. For long stay parking, such as workplaces,
lockers to allow storage of clothing and equipment
and changing facilities should be provided. The
SCOTS’ Road Development Guide (page 154) provides
further provides further design details for motorcycle
parking.
For houses, provision could be in a garage or a secure
rear garden with suitable exterior access. For flatted
developments, covered and secure facilities should be
provided.
Electric vehicle charging infrastructure
Edinburgh has made huge progress in encouraging
the adoption of electric/hybrid plug-in vehicles,
through deployment of extensive charging
infrastructure. As plug-in vehicles make up an
increasing percentage of the vehicles on our roads,
their lack of fuel emissions will contribute to
improving air quality, and their quieter operation will
mean that a major source of noise will decrease (see
Section 2.5 - Environmental Protection).
The Sustainable Energy Action Plan is the main
policy supporting the Council’s Electric Vehicle
Framework. Increasing the number of plug-in vehicles
and charging infrastructure in Edinburgh will provide
substantial reductions in road transport emissions.
To ensure that the infrastructure required by the
growing number of electric vehicles users is delivered,
one of every six spaces should include a fully
connected and ready to use electric vehicle charging
point, in developments where ten or more car parking
spaces are proposed. Electric vehicle parking spaces
should be counted as part of the overall car parking
provision and not in addition to it.
Fast charging provision will be required for residential
developments, whilst for all non- residential
developments, rapid charging will be required
(information on fast and rapid chargers is detailed in
the following Technical guidance). Information on the
infrastructure being provided should be included in
the supporting transport submission provided with an
application.
For individual dwellings with a driveway or garage,
provision should be made for infrastructure to
enable simple installation and activation of a charge
point at a future date. This can include ducting and
cabling as well as capacity in the connection to the
local electricity distribution network and electricity
distribution board. To further meet increasing
future demand for charging points, provision for
infrastructure enabling future installation should also
be considered in developments where charging points
are being provided.
Plans detailing who will be responsible for managing
and maintaining charging infrastructure should
be submitted with planning applications. Where
infrastructure is installed in areas to be adopted
by the Council, management and maintenance
arrangements are to be aligned according to
provisions detailed in the Council’s Electric Vehicle
Action Plan.
Location and security of charging infrastructure needs
to be carefully considered – charge points should
be sited in convenient locations and CCTV or other
security measures should be installed, particularly
near rapid chargers.
112

Page 107

60
Typical charging equipment tends to be in the form
of charging posts or wall mounted charging units.
Charging of an electric vehicle’s drive battery can
be performed in various ways by different charging
equipment. The terms ‘charging post’, ‘charge
point’ and ‘charger’ are not, strictly speaking,
interchangeable but are used broadly to describe the
process.
Charging infrastructure has developed greatly over
the last few years. Whereas the first generation of
electric vehicles could be found charging at a slow
rate from a standard household socket, the current
minimum standard is a dedicated ‘Type 2’ socket/
single phase AC supply offering outputs of up to 7kW
per hour. Where a three phase AC supply is available,
an otherwise identical higher powered unit can be
installed offering up to 22kW per hour. Although not
all electric vehicles are currently capable of accepting
AC current at 22kW per hour, the trend has been for
manufacturers to improve their vehicles AC charging
ability. The highest power charge point should always
be considered in order to future proof an installation
where possible. AC charging at the above noted power
outputs is performed at units which are wall or ground
mounted, typically (but not exclusively) with un-
tethered cables specific to the vehicle.
Source: Code of Practice on Electric Vehicle Charging Equipment
Installation (IET Standards, 2012) Fountain Park installation of underground car-park electric vehicle
charging.
‘Rapid charging’ is a term given to the fastest current
method of charging an electric vehicle’s battery and is
performed by a much larger unit with tethered cables
and adapters. Rapid charging can provide significantly
higher power and output rates than described above.
A typical rate of charge to 80% capacity of an electric
vehicle’s battery can be performed in around 30
minutes.
Guidance and advice on sourcing electric vehicle
charging infrastructure is available from the following
sources:
UK Electric Vehicle Supply Equipment Association
British Electrotechnical and Allied Manufacturers’
Association
Technical guidance
113

Page 108

61
Provision for car club vehicles
Car clubs are well established and have been in
operation in Edinburgh since 1999. Car clubs are
membership based and provide access to pay- as-you-
go cars and vans parked in clearly marked spaces in
publicly accessible locations.
An increasing number of people find that using a car
club is cheaper and more convenient than owning a
car, and businesses may utilise this facility to provide
fleet vehicles for employees. LDP Policy Tra 2 (Private
Car Parking) states that where complementary
measures can be put in place to make it more
convenient for people not to own a car, such as access
to a car club scheme, reduced car parking provision
may be justified. Provision for car club should be
maximised on all major new developments where
practical.
Early dialogue with the Council and a car club
representative should take place to establish the
acceptability of the location and any practicalities
in implementing a car club scheme as part of a new
development. Where car club spaces are considered
acceptable as part of a new development the Council
will require a financial contribution towards the cost
of this provision (refer to the Council’s Guidance on
Developer Contributions and Affordable Housing).
For housing developments, prospective residents
should be made aware of the car club facility as part
of a welcome pack associated with a Travel Plan.
Car club spaces, Quartermile
Parking Standards
Parking Standards (the Standards) are used as
guidance for influencing the levels of parking
associated with new developments. To encourage a
shift from the private car to more sustainable modes
of travel, the Standards help by setting maximum
limits for general car parking to restrict excessive
provision, while setting minimum levels for accessible
car parking, cycle parking, motorcycle parking and
electric vehicles. Any deviation from the parking
standards will require reasoned justification and may
be permitted in the following instances:
• Minimum parking provision is physically impossible
but the development is desirable for other reasons;
OR
• Deviation from required minimum parking provision
is deemed essential for reasons of streetscape,
public realm and/or active frontages; OR
• The development can justify the deviation and
alternate provision and  manage travel in a manner
consistent with other Council policies;
With regards to cycle parking, where a relevant
standard is not available, the Scottish Government’s
Cycling Vision of 10% of all trips by cycling will be the
starting point.
The parking standards will be applied on a case by
case basis for applications involving changes of
use, conversions and listed buildings, where other
guidance and policies will be utilised to ensure that
the proposals meet the Council’s aims and objectives
in terms of transport.
The zones and parking requirements in the Standards
are aligned to public transport accessibility levels,
Controlled Parking Zones, and strategic development
zones. The Standards for zones with good public
transport accessibility will require comparatively less
car parking than for zones which are less accessible
by public transport (see page 63). The Standards
also align with Planning Use Classes, and are shown
for different classes of development on page 64.
Lower car parking will be encouraged for development
sites within the existing and proposed Controlled
Parking Zone where residential parking permits
will be issued in accordance with the Transport and
Environment Committee decision of 4 June 2013. 
In all developments the level of parking proposed
should be lower than, or equal to the maximum
limits set by the Standards. Lower provision will be
justifiable in highly accessible and dense locations
such as the city centre, or where detailed parking
overspill mitigation measures have been proposed.
In less accessible locations, low levels of parking
provision may be considered where carriageway
widths are sufficiently wide to safely accommodate
on-street parking (the forthcoming Technical Manual
114

Page 109

62
factsheet ‘Carriageway Widths’ provides street width
details), and where it has been determined by parking
surveys that there are no existing or potential parking
pressures on surrounding streets.
Depending on circumstances, applications for new
developments must include reasoned justification
for the parking provision proposed. To enable this,
appropriate transport information is required for
all developments – this should detail the impacts
of the development in terms of anticipated parking
levels and all forms of access to the site. Transport
information provided should therefore include:
• type and scale of development (proposed use,
planning use class, number of units/rooms, gross
floor area);
• a detailed accommodation schedule, particularly
for residential developments, listing numbers of
each size of unit;
• identification of existing transport infrastructure in
and around the site;
• details of proposed access to and through the site
for pedestrians and cyclists, as well as links to
footways, cycle paths, shared use and core paths
around the site;
• details of proposed access to public transport
facilities and services;
• comprehensive parking information detailing
proposed parking provision (number and layout/
design of spaces, including accessible spaces,
electric vehicle charging points, motorcycle and
cycle parking);
• parking surveys to understand the potential impact
of overspill parking in surrounding streets. The
surveys should identify parking space capacity and
utilisation on streets surrounding the development
and should ideally be 24 hour surveys over a one
week period; and
• mitigation measures where low parking provision
is proposed – this should include measures which
reduce the impact of parking in surrounding streets,
including provision of car club vehicles and travel
packs detailing the accessibility of public transport
and walking and cycling infrastructure.
• For larger developments (50+ residential units,
10,000m2+ gross floor area for business, industry,
storage and distribution developments, and
5000m2+ gross floor area for other developments),
detailed transport studies are required which
include all of the transport information cited
previously as well as more detailed examination of
potential transport impacts, along with proposed
transport measures. This includes:
• trip generation and modal split forecasts;
• traffic analysis, to understand the transport impacts
of the development;
• analysis of potential safety issues caused by
transport generated by the development;
• how car use in and around the development will be
managed;
• measures considered to influence travel behaviour
in and around the development;
• transport planning and demand management
measures including mode share targets; and
• environmental impacts caused by transport in and
around the development.
Before applying for planning permission a pre-
application discussion with the Council can provide an
opportunity to get advice on, and agree the scope of,
the parking and transport information requirements
of an application. As well as discussing the detailed
transport and parking information required, a pre-
application meeting can explore the potential need
for quality audits, road safety audits and Roads
Construction Consents.
115

Page 110

63
The Parking Standards
zones reflect the area’s
accessibility to public
transport.. The parking
zones map should be used
to inform the provision to
be applied at a specific
development, in a given
area of the city. The
map can also help when
considering opportunities
for higher density
developments.
In calculating requirements,
the Standards generally
relate to gross floor areas
unless otherwise stated (i.e
spaces per habitable rooms
in the case of residential
developments).
Technical guidance
116

Page 111

64
Parking standards for each relevant planning use class
The table below helps to determine parking allocations, based on 1 space per xm2 of Gross Floor Area unless otherwise stated
Development by planning use class Car Parking MAXIMUM per parking zone        Cycle Minimum         Motorcycle Minimum
Zone 1 Zone 2 Zone 3 Employees Customers Employees Customers
Class 1 Shops
Retail Warehouse (public use) 1 per 500m2 1 per 50m2 1 per 30m2 1 per 500m2 1 per 1000m2 1 per 4000m2 1 per 2000m2
Retail Warehouse (trade only) 1 per 3000m2 1 per 360m2 1 per 180m2 1 per 1000m2 1 per 2000m2 1 per 8000m2 1 per 4000m2
Shops < 500m2 1 per 100m2 1 per 50m2 1 per 25m2
1 per 250m2 1 per 500m2 1 per 2000m2 1 per 1000m2
Shops 500m2 to 2000m2 1 per 150m2 1 per 70m2 1 per 40m2
Shops > 2000m2 1 per 150m2 1 per 70m2 1 per 40m2
Class 2: Financial/Professional
Services 1 per 100m2 1 per 50m2 1 per 25m2
Accessible parking - minimum provision One space plus 8% of total capacity when 5 or more car parking spaces are provided
Electric vehicles - minimum provision Where 10+ car parking spaces are proposed, one of every six proposed spaces should feature an electric vehicle charge point.
Class 3 Food/Drink
(incl. pubs & takeaways: sui generis)
1 per 20m2 1 per 14m2 1 per 11m2 1 per 75m2 1 per 20 car spaces
Accessible parking - minimum provision One space plus 8% of total capacity when 5 or more car parking spaces are provided
Electric vehicles - minimum provision Where 10+ car parking spaces are proposed, one of every six proposed spaces should feature an electric vehicle charge point.
Technical guidance
Class 4: Business 1 per 3000m2 1 per 385m2 1 per 210m2 1 per 150m2 1 per 1000m2 1 per 2000m2 1 per 8000m2
Class 5: General Industry 1 per 3000m2 1 per 385m2 1 per 210m2 1 per 150m2 1 per 1000m2 1 per 2000m2 1 per 8000m2
Class 6: Storage/Distribution 1 per 3000m2 1 per 385m2 1 per 210m2 1 per 150m2 1 per 1000m2 1 per 2000m2 1 per 8000m2
Accessible parking - minimum provision One space plus 6% of total capacity when 5 or more car parking spaces are provided
Electric vehicles - minimum provision Where 10+ car parking spaces are proposed, one of every six proposed spaces should feature an electric vehicle charge point.
117

Page 112

65
Development by planning use class Car Parking MAXIMUM per parking zone        Cycle Minimum         Motorcycle Minimum
Zone 1 Zone 2 Zone 3
Class 7 Hotels 1 per 5 bedrooms 1 per 2 bedrooms 1 per bedroom 1per 10 bedrooms 1+1 per 20 car spaces
Coach parking Coach parking will be assessed on a site by site basis
Accessible parking - minimum provision One space plus 8% of total capacity when 5 or more car parking spaces are provided
Electric vehicles - minimum provision Where 10+ car parking spaces are proposed, one of every six proposed spaces should feature an electric vehicle charge point.
Class 8 Residential Institutions:
residential homes 1 per 10 beds 1 per 5 beds 1 per 4 beds 1 per 15 beds 1 per 25 beds
Accessible parking - minimum provision One space plus 12% of total capacity when 5 or more car parking spaces are provided
Electric vehicles - minimum provision Where 10+ car parking spaces are proposed, one of every six proposed spaces should feature an electric vehicle charge point.
Zone 1 and 2 Zone 3
Class 9 Housing (including flats: sui generis)
Studio/ 1 room*
1 per unit**
1 per unit
1 per unit
1 per 25 units
2 rooms*
2 per unit3 rooms* 1 per unit
4 or more rooms* 1  per unit 3 per unit
Accessible parking - minimum provision From a threshold of 10+ dwellings (where parking is communal): 8% of total capacity
Electric vehicles - minimum provision Where 10+ car parking spaces are proposed, one of every six proposed spaces should feature an electric vehicle charge point.
For dwellings with a driveway/garage, passive provision should be made so that a charge point can be added in the future i.e.
a 7 kw socket.
Car Club 3-7 Units = 1 vehicle, 8-15 units = 2 vehicles, 16-50 = 3 vehicles, 50+ units will be individually assessed.
* habitable rooms only – excludes kitchens and bathrooms
** Garages counted as car parking at Applicants discretion
Technical guidance
118

Page 113

66
Development by planning use class Car Parking MAXIMUM per parking zone        Cycle Minimum         Motorcycle Minimum
Zone 1 Zone 2 Zone 3
Class 10 Non-Residential Institutions
Schools/nurseries 1 per 150 pupils 1 per 30 pupils 1 per 20 pupils 1 per 9 pupils 1 per 5 car parking spaces
+(1 per 250 pupils)
Libraries (m2 Public Floor Area) 1 per 150m2 1 per 68m2 1 per 50m2 2 per 100m2 1 per 5 car parking spaces
Church/community hall 1 per 120m2 1 per 50m2 1 per 40m2 1 per 67m2 1 per 10 car parking spaces
Accessible parking - minimum provision One space plus 8% of total capacity when 5 or more car parking spaces are provided
Electric vehicles - minimum provision Where 10+ car parking spaces are proposed, one of every six proposed spaces should feature an electric vehicle charge point.
Zone 1 Zone 2 Zone 3
Class 11 Assembly & Leisure
Cinemas/theatres 1 per 24 seats 1 per 10 seats 1 per 6 seats 1 per 50 seats 1+1 per 20 car spaces
Stadium 1 per 300 seats 1 per 150 seats 1 per 30 seats 1 per 200 seats 1+1 per 20 car spaces
Leisure Centre/Gym 1 per 240m2 1 per 100m2 1 per 60m2 1 per 20m2 1+1 per 10 car spaces
Swimming (m2 pool area) 1 per 60m2 1 per 25m2 1 per 15m2 1 per 10m2 1+1 per 20 car spaces
Accessible parking - minimum provision One space plus 8% of total capacity when 5 or more car parking spaces are provided
Electric vehicles - minimum provision Where 10+ car parking spaces are proposed, one of every six proposed spaces should feature an electric vehicle charge point.
Zone 1 Zone 2 Zone 3
Sui Generis - Motor Trade: display area 1 per 80m2 1 per 56m2 1 per 50m2
1 per 7 staff 1+1 per 20 car spacesSui Generis - Motor Trade: spares 1 per 40m2 1 per 28m2 1 per 25m2
Sui Generis - Motor Trade: Service/repairs 1 per 2 bays 1 per 2 bays 1 per 2 bays
Sui Generis - Motor Trade: staff 1 per 15 staff 1 per 4 staff 1 per 1.5 staff
Sui Generis - Student Flats 1 per 20 beds 1 per 6 beds 1 per 5 beds 1 per 1 bed 1 per 25 beds
Accessible parking - minimum provision One space plus 6% of total capacity when 5 or more car parking spaces are provided
Technical guidance
119

Page 114

67
2.5   Environmental protection
Development should actively help enhance the
environment, manage exposure to pollution and
reduce overall emissions.
Adopt good design principles that reduce emissions
(noise, air and light pollution) and contribute to
better pollution management.
Balconies should be avoided in locations which
experience poor air quality, and where there is
excessive noise.
Local Development Plan policies
• Env 2 - Pollution and Air, Water and Soil Quality
Air Quality
The location and design of a development has a direct
influence on exposure to elevated air pollution levels.
This is particularly relevant where developments
include sensitive uses such as residential uses,
hospitals, schools, open spaces and playgrounds.
Developers should maximise the contribution the
building’s design, layout and orientation make to
avoiding the increased exposure to poor air quality
and these elements, therefore, need to be considered
at the initial design stage.
Good practice principles in the design stage should
be aligned to Delivering Cleaner Air for Scotland, and
should consider the following:
• New developments should not contravene the
Council’s Air Quality Action Plan, or render any of
the measures unworkable;
• Wherever possible, new developments should not
create a new “street canyon” or building layouts
that inhibit effective dispersion of pollutants;
• Delivering sustainable development should be the
key theme for the assessment of any application;
and
• New development should be designed to minimise
public exposure to pollution sources, e.g. by
locating habitable rooms away from busy roads, or
directing combustion exhaust through well-sited
vents or chimney stacks.
Where possible, new trafficked roads should align
to prevailing winds which may help with pollutant
dispersal, alternatively, the creation of a buffer zone
between busy roads and buildings could be another
practical solution to pollution exposure.
Other relevant national guidance and policy which
should be adhered to includes Planning Advice
Note 51 (Revised 2006): Planning, Environmental
Protection and Regulation, and Cleaner Air for
Scotland: The Road to a Healthier Future, November
2015.
Developers should also consider the location of
outside space including gardens, balconies and
roof terraces proposed in areas of particularly poor
air quality. Outside spaces should be screened
by planting where practical, and be appropriately
designed and positioned to minimise exposure to
pollutants.
Protecting internal air quality
To protect internal air quality, developers should
specify environmentally sensitive (non-toxic)
building materials. The use of materials or products
that produce volatile organic compounds and
formaldehyde which can affect human health,
should be avoided. It is also important to maintain
combustion plant and equipment, such as boilers, and
ensure they are operating at their optimum efficiency
to minimise harmful emissions.
Air flow pattern in a street canyon – where vehicular traffic is
expected street canyons should be avoided
120

Page 115

68
Noise
In addition to reducing general quality of life,
excessive noise can damage health and harm the
environment.
The density and mix of uses within Edinburgh
contribute to the vibrancy of the place. However, noise
associated with this mixture of land uses can be a
nuisance to sensitive occupiers.
Where a proposed development will emit noise, the
site layout should be designed to minimise future
noise complaints, incorporating the most appropriate
mitigation measures into the scheme.
Where a proposed sensitive development is likely to
be exposed to noise, developers should design the
layout to minimise noise and implement the most
appropriate measures to ensure amenity is protected.
This could include locating noise sensitive areas/
rooms away from the parts of the site most exposed
to noise or designing the building so its shape
and orientation reflect noise and protect the most
sensitive uses.
Masterplan layouts should be designed to allow
enough external space to accommodate landscape
buffers (with mounding and planting) from any
source of noise (e.g., busy roads, factories, etc). 
Such solutions are preferable to the use of acoustic
barriers which are visually unsightly.  Green acoustic
barriers may be more attractive but they have a high
maintenance burden.  Landscape mounding and
planting is much better as it also contributes to visual
amenity and biodiversity enhancement.
Reference should be made to Planning Advice Note
1/2011 Planning and Noise in addition to industry
technical guidance and British Standards when
addressing relevant issues, for example BS4142 –
Method for Rating Industrial Noise Affecting Mixed
Residential & Industrial Areas and BS8233:2014 -
Guidance on sound insulation and noise reduction for
buildings.
Lighting
Lighting is a critical component in the design of
high quality public realm and it has an important
role in supporting placemaking across the city. The
Sustainable Lighting Strategy for Edinburgh offers
lighting principles which help to encourage lighting
designs that will reduce energy use and cost, and
minimise light pollution.
Good design for noise was used at Our Dynamic Earth to stop
noise escaping from one of their function areas. Instead of
installing doors they installed a triangle, zigzagged corridor.
Further guidance is contained within; Guidance Note;
Controlling Light Pollution and Reducing Lighting
Energy Consumption;
PAN 51: Planning, Environmental Protection and
Regulation; and
PAN 77: Designing Safer Places.
Contaminated Land
Early identification of land contamination issues
enable the consideration of mitigation measures,
phasing and the potential to implement less
expensive, and more sustainable, in-situ clean up
technologies. An assessment of the risks associated
with developing contaminated or potentially
contaminated land is essential to inform decisions
about the appropriate level of treatment, clean up or
sustainable remediation that may be required. The
Council holds details on potentially contaminated land
based on historic land uses. Where a site is affected
by contamination, it is the developer’s or landowner’s
responsibility to develop the site safely.
Odour
Chimney or flue termination points located at low
levels in relation to adjacent buildings, can cause
problems for residential amenity, as well as having
visual impacts. Consideration should be given when
designing extraction for commercial kitchens, the flue
system for a wood burning stove or when dealing with
the industrial processes to the location and height
of these points. It is more effective to address odour
at the design and planning stage of a new plant or
process than to seek to abate a statutory nuisance
from odours retrospectively.
121

Page 116

69
2.6   Minimise energy use
Minimise energy needs through a combination of
energy efficiency and incorporate low or zero carbon
equipment.
Ensure low and zero carbon equipment is sensitively
integrated into the design.
Support appropriate energy generation to help meet
national targets.
Local Development Plan policies
• Des 6 - Sustainable Buildings
Scottish Ministers have set ambitious climate change
targets around cutting greenhouse gas emissions.
More energy efficient buildings and decarbonising the
heat supply are key to helping achieve these targets.
Energy Reduction in New Buildings
All new developments will be expected to comply with
the carbon dioxide emissions reduction targets set out
within Section 6 - Energy and Section 7 - Sustainability
of the current Scottish Building Regulations through
a combination of energy efficiency measures such
as high levels of insulation, air tightness, energy
efficient appliances, and the use of low or zero carbon
technology.
For all relevant applications, the sustainability
statement form (S1) should be completed and
submitted with the application. Development that
has been independently assessed under BREEAM
or equivalent is required to achieve a sustainability
accreditation/award of at least very good. Achieving
a Silver level certificate for Section 7 of the Building
Regulations is considered by Planning to be
equivalent to a very good accreditation for BREEAM.
Heat Mapping
Heat mapping is an important tool to help identify
locations where heat distribution is most likely to
be beneficial and economical. It can be used to
identify individual buildings and groups of buildings
which could benefit from heat distribution networks.
Heat maps can utilise information on both demand
(domestic, industrial and commercial) and supply
for renewable heat. The Scottish Government has
developed a heat mapping tool for local authorities
based on using standard GIS methodologies.
Heat Opportunities Mapping Supplementary
Guidance has been adopted by City of Edinburgh
Council. The Guidance considers the potential to
establish district heating and/or cooling networks and
associated opportunities for heat storage and energy
centres and looks at how implementation of such
initiatives could best be supported.
Edinburgh’s Sustainable Energy Action Plan 2015 -
2020 (SEAP) shows Edinburgh’s aims for minimising
energy use and provides details of the actions
supporting the introduction of heat mapping and
district heating.
Minimising energy use through careful design—Garvald Street
This housing development achieved a BREEAM excellence award
in recognition of it high standards of sustainability. It achieves this
through a range of measures including insulation, airtightness
and heat recovery.
Integrating micro renewables—Kings Buildings
Solar Panels are integrated into the design of the elevation.
122

Page 117

70
2.7   Materials and detailing
Harmonise materials on new development with the
materials used on surrounding buildings.
Use sandstone where sandstone is the commonly
used building material.
Where alternative materials are used, these should
either harmonise or provide a striking contrast.
Keep the number of materials on new development
to a minimum.
Detail buildings to ensure they have a good visual
appearance that lasts over time.
Use greenroofs where appropriate and creative
detailing to help manage surface water.
Protect and enhance biodiversity by incorporating
habitat structures into the detailing of buildings.
Local Development Plan policies
• Des 4 d) - Development Design
• Des 6 - Sustainable Buildings
• Des 9 – Urban Edge Development
Materials are key to whether or not development
achieves sufficient design quality, appropriate for its
context.
Edinburgh’s distinctive appearance and character
is partly a result of the limited palette of quality
traditional materials that are used in its buildings.
Much of the city’s built heritage is characterised by
sandstone buildings and slate roofs.
High quality detailing and design—Circus Lane
Considerable attention to detail has helped create a very refined
design.  This building sets the standard for mews conversions
within the city. 
The choice of building materials may be a condition of
planning permission.
On larger or more prominent schemes, sample panels
may need to be constructed for approval. This is to
demonstrate how the proposed building materials
fit together. This should include hard landscaping
details.
Section 3.7 Hard landscape, sets out the Council’s
expectations for materials in hard landscaped areas.
Some parts of the city use a wider range of materials
in addition to these. In these areas there may be more
scope to use alternative high quality materials than
elsewhere.
Development at the urban edge should make use of
materials, colours and textures that integrate well
with the adjacent settlements and contribute to the
overall unity of the landscape setting. Materials that
detract from the visual character of the greenbelt
boundary will not be supported.
The reasoning behind the selection of materials
should be set out in a design statement.
The long term visual success of building materials
is dependent on how they are detailed and how
they weather. Some materials are more likely to
suffer from adverse weathering such as staining.
Where the Council thinks this might be the case,
detailed drawings may be required to fully assess the
proposals. The durability of particular materials can
be assessed by examining existing examples.
Construction techniques can be used to incorporate
habitat structures into the design of new buildings
in order to increase biodiversity, for example, bat
and swift boxes. Further information can be found in
’Biodiversity for Low and Zero Carbon Buildings: A
Technical Guide for New Build’.
The following pages set out in more detail the
Council’s technical expectations for building materials.
123

Page 118

71
Stone
Edinburgh’s distinctive sandstone forms the basis of
the city’s traditional character and inherent quality.
Much of Edinburgh’s sandstone was hewn from
local quarries that are now closed; most famously
Craigleith but also at other quarries such as Hailes,
Humbie, Ravelston, Binnie and Granton.
It is expected that natural sandstone will be used as
the main external building material in development
where sandstone is the dominant material on
neighbouring buildings or in the surrounding area.
This is particularly important on facades that can be
seen from the street.
This principle applies in conservation areas but also to
other areas of the city with stone buildings including
prominent areas such as arterial routes.
Scottish sandstone is still available from a few
quarries, such as Clashach in Moray and Cullaloe
in Fife, a good match for Craigleith stone. Pennine
Sandstones - Crosland Hill can also provide suitable
matches.
Red sandstone, historically from the West of Scotland,
contributes towards the city’s character. It has been
used effectively to help integrate modern buildings
into historic areas where red sandstone is already
used.
Granite is considered acceptable, where a contrast
with surrounding buildings is appropriate (for example
to emphasise important public buildings) and as a
secondary element (for example on plinths where its
Sandstone in a villa area—Newbattle Terrace
Sandstone will be sought for new buildings in villa areas where
the surrounding buildings are built of sandstone.
Where sandstone would be sought—Angle Park Ter.
If the white painted building were to be demolished, the Council
would seek a sandstone for its replacement, given the site’s
context of sandstone buildings on each side.
Modern use of stone in an historic context
At the Museum of Scotland (above) rigorous and sculptural
use of sandstone cladding provides the building with a striking
contemporary aesthetic that responds positively to the surrounding
historic context. Care needs to be taken with any proposal like this,
that the detailing mitigates adverse weathering and staining.   
Informatics Forum—Charles Street
Sandstone is built into vertically proportioned panels which are
used to order the design of the elevations.
robustness and good weathering characteristics helps
maintain the appearance of buildings).
The size of stone used should match that of nearby
buildings.
Technical guidance
124

Page 119

72
Cast stone and concrete
Cast stone and concrete are acceptable where
their uniform appearance is appropriate and
where measures have been taken to avoid adverse
weathering such as the build up of dirt, streaking and
staining.
It is important that there is a strong underlying reason
for using cast stone or concrete rather than stone.
One reason is that the design may be based around
an idea of having very large or unusual shaped panels
that would be very difficult to construct in single
blocks of stone.
Measures to avoid adverse weathering include:
• Architectural details which control the water
run-off from a facade in ways which enhance the
weathering characteristics;
• The specification of the surface finish; and
• The inclusion of sealants to the surface.
Cast stone is manufactured with aggregate and a
cementitious binder. Its appearance is intended to
be similar to natural stone. Unlike naturally formed
stone, which tends to be visually rich, blocks of cast
stone appear alike. This can look dull in comparison
with natural stone. This effect is emphasised over
time when typically cast stone will weather in a more
uniform way than similarly detailed natural stone.
Further information about pre-cast concrete cladding
can be found at www.britishprecast.org.
A mixture of cast stone & natural stone—Morrison St.
Cast stone was used at high level on the drum shaped part of the
building while natural stone was used at low level on the corners.
Concrete used sculpturally—Horse Wynd
The sculptural potential of concrete is exploited in the Parliament
wall with the patterned surface and integration of lights
In-Situ Concrete—Museum of Scotland
This concrete is used to sculptural effect on the museum building.
Textures created with concrete—Princes Street
Concrete panels with a textured surface treatment are used on this
recent building on Princes Street.
Technical guidance
125

Page 120

73
Cladding
High quality metal cladding may be acceptable in
some historic environments where there is already a
range of building materials. It may also be acceptable
where overt contrast is sought and considered
appropriate. Appropriateness depends on the quality
of the finish and detailing as well as the character
of the surrounding environment. High quality metal
cladding might be acceptable in some locations in the
Old Town, it is less likely to be acceptable amongst the
palatial frontages of the New Town. The surface finish
of the cladding should be raw or treated metal which
does not have a coating. The fixings of any cladding
should be hidden.
There are a range of cladding materials and ways
in which these can be constructed. Metal cladding
can provide buildings with a striking contemporary
appearance, however, if used inappropriately it can
have a negative visual effect.
Resin and cement based panels can be used on
less sensitive sites and where their use is limited or
will have a minimal visual impact. Because of their
poorer visual characteristics in comparison with metal
claddings like anodised aluminium, stainless steel
and zinc - these should be avoided in conservation
areas including those with villas.
Where resin based panels are used as cladding,
synthetic prints which aim to emulate wood should be
avoided. These are not considered to have as positive
a visual effect as natural timber.
Using zinc to provide striking contrast—Infirmary St.
The zinc cladding combined with the modern building form
provides a positive contemporary contrast to the historic former
Infirmary Street Baths building. 
Too many materials
The cladding, blockwork and render and their detailing used at
this development would not now meet the Council’s expectations
for appropriate quality. 
Aluminium—Simpson Loan
Multi-toned anodised aluminium cladding provides a striking and
positive contrast to the historic buildings making the distinction
between new and old very clear.
High quality detailing—Sighthill Court
Construction of a sample panel and approval were required by
condition in order to ensure the design intent of a high quality
finish was executed.
Technical guidance
126

Page 121

74
Timber
Timber should be appropriately detailed to ensure
that it retains a good visual appearance over time, and
that durable species should always be used. Sensitive
sites include conservation areas and arterial routes
into the city. Durable species include European Oak,
Western Red Cedar and Sweet Chestnut. Moderately
durable species can be used on smaller proposals
which are not in sensitive sites. Moderately durable
species include Larch, Douglas Fir and European
redwood.
Tropical hardwoods should be avoided unless it
can be clearly demonstrated that these are sourced
sustainably. More information about timber can be
found at www.trada.co.uk.
For local developments in sensitive locations and all
major developments durable species should be used.
Sensitive sites include conservation areas and arterial
routes into the city.
Specification and architectural details at a 1:5 or 1:10
scale of the proposed timber cladding may be sought.
These should set out the thickness of the timber
(which should not be less than 19mm finished size)
and the types of fixings, which should be specified
to ensure no staining. The details should show how
water will be shed clear of the ends of timber to
ensure moisture absorption is prevented.
Careful detailing—Arboretum Place
The timber cladding overhangs cladding on lower levels of the
building. This helps shed water from its surface, and protects it
from adverse weathering.
Sculptural effect—Upton
The timber cladding is used to give these houses a striking
appearance.
Image courtesy of Steve Tiesdell Legacy Collection
Durable species—Informatics Forum
The timber cladding is Oak. This is a durable species that is
appropriate for use in prominent or sensitive areas.
Technical guidance
127

Page 122

75
Brick
Brick generally has good weathering characteristics,
and can be specified so that its colour and texture
harmonises with surrounding buildings. In sites
outwith conservation areas and where the design
proposed is of a high quality, brick can be used
positively.
Where brick is used in an existing context of stone
buildings it is expected that the brick and mortar will
be specified to harmonise with the range and tone
of colours in the surrounding buildings. Note that
generally, the expectation is for the use of natural
stone where natural stone is the prevalent building
material.
Brick can also be used to provide contrast, however,
care needs to be taken with this approach to ensure
that the architectural effect is not at the expense of
the quality of the design of the street as a whole.
The proportions of windows play a major role in giving
brick buildings an Edinburgh character. Traditional
tenements have large vertically proportioned
windows. Using windows of the same size and
alignment can help integrate brick buildings into their
surroundings.
Although not a prevalent building material, brick has
been used in certain locations within Edinburgh to
positive effect. Brick is commonly used in industrial
structures such as maltings and as a secondary
element, for example on side and rear elevations or
chimney stacks. Many traditional Edinburgh examples
used locally produced Portobello brick which was
produced into the early 20th Century.
Care needs to be taken with the specification of brick
and also during construction to avoid efflorescence.
This is the build up of salts present in the brick
material appearing on the surface of the wall as the
mortar cures.
Subtle variation—Telford March
Two different mixes of brick have been used to provide variation
in colour within the elevations. 
Modern use of brick in an historic environment—McEwan Square
/ Fountainbridge
Brick has been used to integrate this development into its historic
surroundings. The development is overtly contemporary in its
appearance. The colour of bricks was chosen to harmonise with
the stone of the adjacent tenements. Combined with the vertical
emphasis to the window and the building’s scale, the material
choice has helped ensure this development adds to Edinburgh’s
sense of place. This development sets the standard for the use of
brick within Edinburgh.
Technical guidance
128

Page 123

76
Render/harl
When appropriately specified and in appropriate
locations, render can be used as an external building
material which can contribute towards Edinburgh’s
sense of place.
Appropriate specifications include:
• Ensuring it does not discolour or fade over time and
it does not suffer from algae growth or lime bloom;
• Consideration of the location of all expansion and
movement joints, slim vents, boiler flues, extract
ducts and rain water goods etc. to ensure these do
not have an adverse visual impact; and
• Consideration of architectural detailing to shed
water from the surface of the render. Note that
details may be sought.
There is a strong tradition of rendered buildings in
parts of the city area which predate the building of the
New Town, for example, the Old Town and the centre
of Queensferry. This use has continued and render can
be used to provide contrast in locations like these on
contemporary buildings. Where render would make
a building stand out in longer views, this should
generally be avoided.
Render also has a contemporary appearance that is
appropriate in areas where the overall character is
modern.
In some areas, because of levels of vehicular traffic
and microclimate, pronounced weathering is evident.
On rendered buildings this can look adverse.  An
example area is the Cowgate, where the canyon-like
form of the street contains pollution which stains
external wall surfaces. Render tends to highlight these
effects rather than suppress them.
For this reason contextually appropriate alternative
materials with better weathering characteristics may
Integrating the new with the old - High Street
The controlled use of render, combined with sandstone, create a
positive modern addition to the Old Town
Positive contrast - Old Fishmarket Close, off High St
The use of render and timber contrast positively with surrounding
stone buildings.
Impacting adversely on views - Calton Hill
The rendered buildings stand out against the surrounding stone and slate buildings.  Alternative materials may have allowed the
buildings to integrate better into the view. 
be a better choice in areas or streets like this.
Traditional lime renders and lime harling can be used
in appropriate locations.
Technical guidance
129

Page 124

77
Hard roofing materials
Slate, pantiles and metals such as lead, stainless
steel, zinc and copper contribute to Edinburgh’s
roofscape. All these materials are generally
considered appropriate. Synthetic versions of these
materials should be avoided in conservation areas.
The use of synthetic materials will be considered on a
case by case basis in other areas of the city and their
appropriateness will be assessed against:
• The extent of use;
• Their prominence on the building; and
• The prominence of the building on the setting of the
city and setting of the street.
Edinburgh has a strong tradition of using slate (such
as Ballachulish) as a roofing material. The palette of
darker greys of slate helps to draw out the warmth of
sandstone.
Synthetic materials inadequately replicate the
characteristics of materials they seek to emulate and
as a consequence have a poorer appearance.
The vulnerability of metal roofing to theft should be
considered at the design stage.
Green Roof with wildflower planting - Waverley Court
The planting on this green roof has been designed to enhance
biodiversity
Traditional roofing materials
Slate, Lead and zinc are traditional roofing materials used in
Edinburgh—seen here from the Museum of Scotland’s roof.
Metal roofing in a historic context—Canongate
Stainless Steel roofing has been used on the Scottish Parliament.
Green roofs
Green roofs are flat or sloping roofs with some form
of vegetation placed on them. They are intensively
or extensively managed; the former with a deep soil
profile supporting shrubs, trees and grass, and the
latter with a shallow soil profile growing drought
tolerant self seeding vegetation. Both are encouraged
in appropriate locations, particularly adjacent to
green/blue corridors and will be encouraged in
locations adjacent (within 15m) of river corridors. They
have numerous benefits that include prolonging the
life of the roof, attenuating water, reducing sound
transmission, improving thermal efficiency, enhancing
air quality, and habitat creation. Green roofs should
not be regarded as an alternative to open space
provision on the ground.
Care should be taken to ensure that they do not have
an adverse visual effect, for example, disrupting a
visually cohesive existing roofscape. Green walls can
also be used in certain circumstances and provide
many of the benefits of green roofs.
Technical guidance
130

Page 125

78
Gull and Pigeon Deterrents
All developments should include roof designs which
deter roosting and nesting gulls and pigeons. Example
of roof designs which are unattractive for nesting are:
• Roofs which have a smooth surface and a pitch of
more than 25%; and
• Green roofs which are intensive, accessible roof
gardens as the associated human disturbance will
prevent nesting.
Where a flat roof, or features on other types of roof,
may support roosting and nesting, appropriate
deterrent measures should be included in the design.
Any measures must be carefully designed and
maintained to avoid impacts on non-target species
and also to avoid welfare issues such as trapping,
injury or death of birds. Gulls are a protected group
by law (Wildlife & Countryside Act 1981). Measures
which would have an adverse impact on the special
character of the building or its context will not be
supported.
Useful information about design, appropriate
measures and maintenance can be found here.
Aircraft Safety
The impacts of requirements for aircraft safety - for
example the need to deter birds from roofs - should
be considered at the outset to ensure any resulting
features are sensitively incorporated.
Other Materials
To help the sustainability of development, uPVC
should not be used as a material for windows
on major planning applications unless it can be
demonstrated that they are recycled and achieve
a minimum rating of ‘A’ in the BRE ‘Green Guide’.
Thermally broken aluminium, aluminium / timber
composites, and timber windows may provide suitable
alternatives. For listed buildings and conservation
areas refer to the Council’s Guidance on Listed
Buildings & Conservation Areas.
Timber should be from a sustainable source. The
reuse and recycling of materials is encouraged. When
Frameless glazing—Festival Theatre, Nicolson Street
The refined detailing of the frameless glazing helps create a
striking modern addition to the street. Curtain Walling - Buccleuch Place
The potential offered by glazing systems with variations in the
window widths, patterning of the glass and mullion depths is fully
taken advantage of here.
Frameless glazing - George Square Lane
Glazing is used to create the effect of  a floating roof on this
building.
making an application, the Sustainability Statement
Form (S1) should be completed.
Opaque panels in glazing systems or windows should
be avoided.
Consideration should be given to ‘bat friendly’ roof
membranes to support bat populations.
Technical guidance
131

Page 126

79
Materials and colours in distant city views
As mentioned in Section 2.1, building height, building mass, roof treatment, materials and colour
can all impact on city views and Edinburgh’s skyline.
The flats in the middle foreground are taller and larger than neighbouring buildings.  Due to the flat
horizontal lines and the colour of the buildings (cream and turquoise) they do not blend into the
townscape.
View of the city from the Pentlands. 
The suburban development in the foreground is small scale consisting of traditional building
materials with earthy colours which do not detract from the landscape.
Technical guidance
132

Page 127

80
2.8   Adaptability
Ensure buildings are adaptable to the future needs of
different occupiers.
Local Development Plan policies
• Des 5 b) - Development Design
Adaptability
Many buildings are designed with specific uses
in mind. If the design becomes too specific it can
become very difficult to make changes to the building
and give it a new use at a later date. Examples of
making buildings more adaptable include:
• Creating level access so that buildings can be used
by all;
• Ensuring there is sufficient space for changing
needs;
• Ensuring there is sufficient space to store waste
within the site, preferably internally, so that it is off
public land until it requires to be collected;
• Making floor to ceiling heights high enough to
accommodate a range of different uses;
• Providing space for extensions; and
• Designing roof spaces so that they can easily be
turned into floor spaces.
Adaptable laboratory building—Old Dalkeith Road
This building was designed to allow different types and sizes of
laboratory space and all their associated services to be fitted out
and changed over time.
Adaptability in suburbia
The houses are designed with sufficient space that extensions can
be added while retaining relatively large gardens.  In addition,
attics have been converted.
133

Page 128

81
2.9   Mix of uses
If appropriate, create a mix of uses.
Local Development Plan policies
• Des 2b - Co-ordinated Development
• Des 5 b) - Development Design
Mix of uses
Having a mix of uses in a development can help both
its sustainability and the sustainability of an area as
a whole. If the services that people use are located in
close proximity to where they are, there will be less
reliance on transport as people will be more likely to
walk.
Making places vibrant and interesting through
providing a mix of uses, will help them resilient to
changes in the economy and more attractive to new
development. Mix of uses—Middle Meadow Walk
This new development incorporates a mix of uses including
housing, offices, gym, shops and cafes.
Mix of uses—Newhall, England
This office integrates into this suburban development.
Image courtesy of Steve Tiesdell Legacy Collection.
134

Page 129

82
2.10   Daylight, sunlight, privacy and outlook
Design the building form and windows of new
development to ensure that the amenity of
neighbouring developments is not adversely affected
and that future occupiers have reasonable levels of
amenity in relation to:
• daylight;
• sunlight; and
• privacy and immediate outlook.
Local Development Plan policies
• Des 5 a) - Development Design
Providing good levels of natural light and sunlight
in buildings and spaces is beneficial to the health
and quality of life of the residents and users of the
buildings as well as helping to save energy through
reducing lighting and heating demands. For this
reason all proposals for housing (including student
housing, HMO’s and residential care) must meet the
daylight requirements for living spaces (living rooms,
kitchens and bedrooms).
It is important that buildings are spaced far enough
apart that reasonable levels of privacy, outlook,
daylight and sunlight can be achieved. However, care
should be taken that buildings do not become so far
apart that the townscape becomes uninteresting.
Therefore, achieving reasonable amenity needs to be
balanced against achieving good townscape.
Trees have an effect on daylight and sunlight. This can
be positive - for example, deciduous trees provide
shading from the sun in summertime but let sunlight
into buildings in winter. However, if buildings are too
close to trees daylight can be adversely affected.
To achieve reasonable levels of daylight, windows
must be big enough and interiors must be designed
to a deep enough level that ensures daylight can
penetrate within them. Reasonable levels of sunlight
to buildings and spaces will be achieved if sufficient
account is taken of orientation.
Edinburgh has a wealth of successful areas where
good levels of daylighting, sunlight, privacy and
outlook have been achieved. These can be used as
a guide to the layout and form of new development.
When comparing proposed new development against
existing situations, scale drawings, showing layout
including external spaces, building height and
elevations should be provided along with the relevant
calculations and methodology. It is the responsibility
of the agent/applicant to ensure that this information
is provided and that all affected properties are clearly
shown and tested.
This section applies to all new development where
these aspects of amenity are particularly valued
including housing, schools, nurseries, hospitals and
clinics.
Marchmont—Arden Street
These tenements manage to provide good levels of daylight to all
the properties.  This is a result of the high floor to ceiling heights
and relatively large and tall windows which allow daylight to go
deep into the rooms.
Gables—Haymarket Terrace
The upper floors of the modern office are set back from windows
on the tenements’ gable. This allows some daylight to reach the
windows, but importantly maintains the street frontage.
135

Page 130

83
Protecting daylight to existing buildings
Daylight is a requirement for living rooms, Kitchens
(where these are not internalised) and bedrooms, and
for non-domestic buildings where daylight would be
a reasonable exoectation such as schools, hospitals,
hotels and hostels, small workshops and some
offices.
When there is concern about potential levels of
daylight, the Council will refer to the BRE Guide, Site
Layout Planning for Daylight and Sunlight – A Guide
to good practice. This shows how to measure daylight
and sunlight.
New buildings should be spaced out so that
reasonable levels of daylight to existing buildings are
maintained. The layout of buildings in an area will be
used by the Council to assess whether the proposed
spacing is reasonable.
The amount of daylight inside new buildings will be
influenced by a number of factors such as the height
and number of windows, the presence of obstructions,
the depth of the building and the reflectance of
surfaces nearby. If the space in a layout is restricted
the level of daylighting can be increased in a number
of ways including increasing window sizes. Raising
the height of the window head can be particularly
effective especially for basement windows.
It is important to understand the difference between
the levels of daylight before and after the proposed
development is in place. Applicants should provide
assessment information showing the amount of
daylight in an existing building before and after
the proposed development is in place in order to
demonstrate that there would not be an unacceptable
impact on daylight to existing buildings.
The amount of daylight reaching an external wall is
measured by the Vertical Sky Component (VSC). The
Council requires this to be more than 27% or 0.8 of
its former value. If this is not the case, changes to
the building design, including a reduction in building
height may be required. 27% VSC is achieved where
new development does not rise above a 25° line
drawn in section from the horizontal at the mid-point
of the existing window to be tested. This is the 25°
method.
The vertical sky method can be measured using more
complex methods that are set out in the BRE guide.
If a proposed development would not meet these
requirements, particularly in the more sensitive and
densely planned parts of Edinburgh, the Council
may require more detailed information on the likely
amount of daylight in affected rooms in existing
buildings. This will be assessed using the Average
Daylight Factor (ADF) methodology. It is expected
that applicants will use the following criteria for
calculations:
Daylight to bathrooms, stores and hallways will not
be protected. Daylight to gables and side windows is
generally not protected.
Measuring Vertical Sky Component 25o method example 1
This situation may fail to provide reasonable levels of daylight to
the existing building.
a Section
1.8m
Existing building
25°
Proposed Building
a Section
1.8m
Existing building
25°
Proposed Building
Measuring Vertical Sky Component 25o method example 2
This situation would provide reasonable levels of daylight to the
existing building.
Minimum ADF for bedrooms 1%
Minimum ADF for living rooms 1.5%
Minimum ADF for kitchens 2%
Minimum ADF to reading spaces in libraries,
classrooms and educational buildings where
these currently exceed
2%
Transmittance of double glazing 0.65
Correction factor for dirt, curtains etc. 0.9
Net to gross area of window 0.7
Average reflectance of room surfaces 0.5
Technical guidance
136

Page 131

84
Providing daylight to new buildings
Another measure of daylight is known as the position
of the “no sky line” (the point beyond which the sky
cannot be seen on a working plane*). The BRE guide
explains this in detail. If drawings can be provided
that show that direct skylight will penetrate at least
half way into rooms within new development at the
height of the working plane* and where windows
make up more than 25% of the external wall area, this
will ensure that adequate daylight is provided to new
development.
Providing adequate daylight to new development
does not guarantee that adequate daylight will be
maintained to existing development. This could be the
case in instances where the existing building is lower.
No sky line method
The no sky line divides areas of the working plane* which can and
cannot receive direct skylight. The extent of skylight in a room can
be increased by raising the height of the window head.
*the working plane will be different for different types of rooms –
in housing it is assumed to be 0.85m above floor level and 0.7m
high in offices.
Sunlight to new gardens and open spaces
Sunlight is an important feature of gardens and open
spaces. Applicants should assess the availability of
sunlight for all open spaces which could be created or
affected by new development, this includes:
• gardens (usually the main back garden);
• parks and playing fields;
• children’s playgrounds;
• outdoor swimming pools and paddling pools;
• sitting out areas such as those between non-
domestic buildings and public squares;
• focal points for views such as a group of
monuments or fountains
Each of these spaces will have different sunlight
requirements however half the area of gardens
or amenity spaces should be capable of receiving
potential sunlight for more than two hours during the
spring equinox. This will be assessed using hour by
hour shadow plans for each hour of 21 March.
Sunlight to existing gardens and spaces
New buildings should be laid out so that reasonable
levels of sunlight are maintained to existing gardens
and spaces.
Whether sunlight to neighbouring gardens will be
affected can be tested by checking whether new
development rises above a 45° line drawn in section
from the site boundary. If a development rises
above this line, the amount of sunlight falling in
Orientation of boundary in relation
to potentially affected garden
Height  of 45° line
above boundary
N 4m 
NE 3.5m
E 2.8m
SE 2.3m
S 2m
SW 2m
W 2.4m
NW 3.3m
the neighbouring garden might be affected. To take
account of orientation, the 45° line should be drawn
at the following heights above ground level along the
different boundaries around the site:
Technical guidance
45o method for sunlight
This sketch shows a proposed development located on the north
side of an existing garden.  The sunlight to the neighbouring
garden might be adversely affected because it rises above the 45
degree line set from 4m above the boundary.
137

Page 132

85
The use of the affected area of the garden and the
size of the garden as a whole will be taken into
account when assessing whether any loss of sunlight
is adverse. The sunlight of spaces between gables
will not be protected unless the affected space is
of particular amenity value in comparison with the
remainder of the garden. Such a space may include
one that has been designed with the house as a patio.
Note that these heights do not indicate whether
a development will be acceptable when assessed
against other considerations.
Where there is an established high quality townscape
which in itself would not satisfy the requirements of
the 45° method for sunlight (such as the Old Town)
sunlight will be assessed using before and after
plans showing shadows for each hour on 21 March.
The qualities of the existing space and the effects of
sunlight, both before and after will inform whether
any loss of sunlight is considered adverse.
Privacy and outlook
People value privacy within their homes but they also
value outlook - the ability to look outside, whether
to gardens, streets or more long distance views. To
achieve both, windows should be set out so that
direct views between dwellings are avoided.
The rearward side of development often provides a
better opportunity for privacy and outlook than the
streetward side of development. This is because on
the streetward side, privacy to some degree is already
compromised by the fact that people in the street can
come relatively close to the windows of dwellings.
Privacy is generally achieved in these situations
through the installation of blinds, curtains and
translucent glass, etc.
The pattern of development in an area will help to
define appropriate distances between buildings and
consequential privacy distances. This means that
there may be higher expectations for separation in
suburban areas than in historic areas such as the Old
Town.
On the rearward side, as well as spacing windows far
apart, reasonable levels of privacy can be achieved
by setting out windows on opposing buildings so
that there are not direct views between them, angling
windows and erecting screens between ground floor
windows. In assessing this, the Council will look at
each case individually and assess the practicalities of
achieving privacy against the need for development.
Though private views will not be protected, immediate
outlook of the foreground of what can be seen from
within a building may be. Unless there are exceptional
circumstances, this means that new development
that blocks out the immediate outlook of an existing
dwelling must be avoided.
This guidance does not seek to protect the privacy of
gables of existing housing.
Technical guidance
138

Page 133

86
2.11   Housing mix and size, and supporting facilities
Ensure there is a mix of dwelling types and sizes
to meet a range of housing needs including those
of families, older people and people with special
needs.
Make sure the size of homes are adequate for the
numbers of people that could be living there.
Provide adequate storage for general needs, waste
and recycling, and bicycles.
Ensure the design of new housing is “tenure blind”.
Local Development Plan policies
• Hou 2 - Housing Mix
• •Hou 10 - Community Facilities
Edinburgh Local Development Plan Policy Hou 2
seeks to provide housing that will meet a range of
housing needs including people with special needs
and older people. A mix of unit sizes and housing
types will have a positive impact on ensuring the
delivery of varied and sustainable communities.
This mix should respond to the differing needs of
residents, immediate site conditions and citywide
objectives. As a general principle an inclusive
approach to design should be taken to ensure
that buildings are accessible to as wide a range
of people as possible. Solutions to make houses
accessible should be integral to a design rather than
an afterthought added in order to meet duties under
building standards or other legislation.
It is expected that within all developments of 12 or
more units at least 20% of these units will have a
minimum internal floor area of 91m2 and should be
designed for growing families. These will have direct
access to private garden, from either ground or first
floor level; enhanced storage and convenient access
to play areas.
Housing type Examples:
Flats - self-contained
premises within a
building which is
divided horizontally
- some may have
an entrance taken
directly from the
street
• 4 in a block
•  Tenement
•  Studio apartments
•  Maisonettes
•  Colonies
•  Garden flats
Houses - self-
contained dwelling
with an entrance
taken from the street
Detached
•  Semi-detached
•  Terraced
•  Town house
•  Cottage
•  Bungalow
•  Mansion
In larger development sites, the provision of facilities
and services to support the existing and proposed
community may be required. These may include local
healthcare facilities, childcare facilities and meeting
places. Commercial units may be needed, if these do
not already exist in the area.
Affordable housing will be required in accordance with
the policy in the Edinburgh Local Development Plan
and associated guidance.
Tenure blind housing at Gracemount— Soutra Road
Here the market housing and affordable housing is integrated by
using the same materials for buildings and street and designing
the housing to have a similar appearance.
139

Page 134

87
Student housing
Student accommodation should comprise a mix of
type of accommodation, including cluster units, to
meet varying needs of students.
Student accommodation is a primary place of
residence and therefore it is critical that design is of
a high quality with adequate amenity to contribute
to healthy and sustainable lifestyles and quality of
life. The provision of daylight, sunlight, privacy and
outlook is of particular importance (see section 2.10).
Where development cannot reasonably accord with
the minimum standards required, development will
not be supported.
Student Housing - St Leonards Street
More detailed design information and guidance can
be found in:
Building standards technical handbook: domestic.
Best Practice Guidance for wheelchair accessible
housing - Greater London Authority 2007
Improving the design of houses to assist people
with dementia - this guidance sets out some key
principles that can help people with dementia to
manage within their own homes.
Housing mix
In schemes with 12 units or more, 20% of the total
number of homes should be designed for growing
families. These types of homes should have three or
more bedrooms, have good levels of storage, have
direct access to private gardens (for example via patio
doors or private external stairs) or safe play areas for
children, and have a minimum internal floor area of
91m2.
In order to ensure satisfactory amenity, dwellings
should not fall below the following minimum internal
floor areas:
36m2 Studio dwelling;
52m2 One bedroom dwelling;
66m2 Two bedroom dwelling;
81m2 Three bedroom dwelling; and
91m2 Three bedrooms or more with enhanced 
storage designed for growing families.
More guidance is provided in the City of Edinburgh
Council’s Student Housing guidance (Feb 2016).
The long term adaptability of new student housing
should also be taken into account- considering
how easily the buildings could be converted into
mainstream housing with satisfactory level of amenity
should the demand for student housing decline.
Designing housing for older people and
those with disabilities
Lifetime Homes is a concept developed by housing
specialists to ensure that homes are accessible and
inclusive. The Living Homes standard sets out 16
design criteria which allow houses to accommodate
change in people’s requirements throughout their
lives. The design principles include:
• The approach to all entrances should preferably be
level or gently sloping;
• All entrances should be illuminated and have level
access over the threshold;
• Enable convenient movement in hallways and
through doorways
• Enable convenient movement in rooms for as many
people as possible
• Provide an accessible bathroom that has ease of
access to its facilities from the outset and potential
for simple adaptation to provide for different needs
in the future
• Enable people to have a reasonable line of sight
from a seated position in the living room and to use
at least one window for ventilation in each room
Technical guidance
140

Page 135

88
The minimum floor area for studios is lower than that
for one bedroom flats since the relatively larger single
open plan space found in studios compensates for
having a smaller space overall. It is expected that
studios will be designed to be very space efficient.
Imaginative solutions are encouraged for storage, the
location of the bed and so on.
Internal storage
At least 5% of the net floor areas should be provided
as dedicated storage cupboards in addition to
any kitchen storage or wardrobes. This storage is
needed to allow homes to be used by a wide range of
households.
Shelving should be built into storage areas within
dwellings to accommodate at least three 55 litre
storage boxes for recycling, (see diagram below).
Space for internal
recycling
This drawing shows
a potential way of
providing storage
for recycling boxes. 
Improving internal amenity
In order to ensure a good standard of overall amenity
for new development, there is a presumption towards
dwellings with two (dual) or more aspects.  Dwellings
with a dual aspect have windows which face out
from two separate elevations. The provision of more
than one aspect can result in multiple benefits for
internal amenity. These benefits include opportunities
for better daylight and sunlight, and in providing
greater flexibility as to the use of spaces, such as
positioning bedrooms towards a quieter aspect if the
development is on a busy road.
Single aspect dwellings should not make up more
than 50% of the overall dwelling numbers and
developments should avoid single aspect dwellings
that are north facing, exposed to noise sources,
or contain three or more bedrooms. Where single
aspect dwellings are proposed, the applicant should
demonstrate that they meet the requirements for
daylight, sunlight and privacy for each living space
and provide good levels of ventilation and internal
amenity space
Tenure blind design
Development should be tenure blind. This means that
where sites provide a range of tenures (for example
market sale and affordable housing) it should not be
possible to see the difference between them.
Where a site is predominantly for market housing, it is
expected that affordable housing should be provided
in the same housing type. If the design is for houses
for sale, the affordable dwellings should also be
houses. Where it is not possible to deliver the same
housing type, alternative types of the same physical
scale should be used. For example, colonies, four in a
block and cottage flats may integrate reasonably well
with two storey houses.
Building form, materials and the general design of
the building elevations will all be key components
in determining whether or not a tenure blind
development is achieved.
Technical guidance
The integration of ancillary facilities is important
for small developments—such as those common in
villa areas—as well as in larger developments. In
addition to cycle parking (covered in Section 2.4) and
waste storage (covered in section 2.14), integration
of facilities such as plant, including electricity sub-
stations, needs to be considered from the outset of
the design process.
Technical guidance
141

Page 136

89
2.12   Purpose built homes for rent
The ‘Build to Rent’ (BTR) sector has the potential to
make a positive contribution to the overall housing
mix in Edinburgh.
Proposals should support regeneration and fulfil
placemaking principles.
BTR developments are considered as a strand of
mainstream housing and relevant Local Development
Plan policies and guidance apply.
Design should be place specific, high quality and
energy efficient.
Shared on-site facilities should be high quality,
accessible and safe.
A flexible approach to current internal amenity
standards may be acceptable depending on the
quality of the accommodation and facilities provided.
Local Development Plan policies
• Des 5 - Development Design
• Hou 2 - Housing Mix
• Hou 6 - Affordable Housing
The Private Rented Sector continues to be a key
provider of homes throughout the city.
Recent innovations in this sector have seen the
emergence of purpose built accommodation for
rent, also referred to as Build to Rent (BTR), which
offer high quality professionally managed homes
under single ownership with shared facilities that
can be delivered rapidly. Private Rented Sector
accommodation of this nature can also include the
conversion of existing buildings where the BTR
‘model’ can be incorporated.
BTR developments are considered as a strand of
mainstream housing and where relevant LDP policies
and guidance apply including those relating to
parking, open space and affordable housing.
Build To Rent model
BTR developments are generally characterised by the
following key elements:
• Single ownership and professional on-site
management;
• Self-contained units which are let separately;
• High quality amenities for communal use;
• Longer tenancies offered with defined in-tenancy
rent reviews; and
• Property manager who is part of an accredited
Ombudsman Scheme and a member of a recognised
professional body.
Due to the nature of these developments and
especially where flexibility has been sought against
the Council’s internal amenity standards (refer to
‘Design Approach’), the retention of the homes for
rent for the long term should be explored and secured
via an appropriate method to be agreed between the
Council and the developer.
Design approach
In BTR developments there tends to be key differences
in their design which may justify a more flexible
approach. This specifically relates to the standards
for minimum internal floorspace and the quantity of
single aspect units (see section 2.11.)
The key design differences with BTR developments
compared to other general housing types are usually
as follows:
• Provision of high quality, professionally managed
accessible on-site shared facilities i.e. communal
gathering spaces, secure storage as well as storage
within units, workspaces, a cinema room and a
gym. A variety of different on-site shared facilities
will provide a better quality experience for residents
therefore the provision of a range of options should
be explored to enhance the overall quality of the
development.
• Efficient design technologies which reduce the
requirements for non-habitable space (ie. lobby
areas) within units; and
• Open plan layouts, partly as a result of the
reduction in non-habitable space, which increase
useable space and allow light to penetrate more
deeply into the units. This may justify a limited
increase in single aspect units over the standard
50%. However developments should still be
designed to facilitate a substantial quantity of dual
aspect units.
142

Page 137

90
Flexibility will only be applied to the standards in
exceptional circumstances and will be dependent on
the quality of the development. Any deviations from
the standards needs to be fully justified and will be
determined on a case by case basis. The diagram
overleaf gives an example of where flexibility may be
justified.
This diagram shows how flexibility may be justified
against the floorspace standards subject to design
efficiencies and the provision of shared facilities as
part of the overall development, which may offset any
loss of floorspace (both habitable and non-habitable).
A 1 x bed unit should achieve a minimum internal
floorspace of 52m2 with at least 5% of the net floor
area as storage. This example shows that with the
removal of the lobby, an additional 3m2 habitable
space is achieved along with 0.4m2additional storage
space, despite the reduction in overall floorspace of
4m2.
Developer Contributions
Developer contributions will be applied towards
the provision of services, works and facilities as the
Council may, in its reasonable discretion, determine
are required in connection with BTR developments
in accordance with the Local Development Plan and
associated guidance.
BTR developments will be expected to provide 25%
affordable housing on site. Affordable homes within
BTR developments should be tailored to meet the
greatest housing need and preferably should be
owned or managed by a Registered Social Landlord.
The rental levels, conditions of tenure and the length
of time that the units will remain affordable will be
subject to agreement between the Council and the
developer
143

Page 138

91
2.13   Community safety
Create active frontages directly onto important
streets and publicly accessible routes and spaces.
Provide main door access to ground floor properties
from street side.
Ensure all external spaces including pedestrian and
cycle paths are overlooked.
Use lighting to help community safety.
Local Development Plan policies
• Des 5c - Development Design
• Des 7 - Layout Design
The design of development has a key role to play in
community safety. If buildings overlook and provide
direct access to streets people feel safer. Active
frontages, where the ground floor is designed to allow
visual contact and pedestrian movement between
inside and out, ensure that this is achieved.
Lighting can make a very positive contribution to
the security of the external environment. To ensure
the overall quality of the design, lighting should
be integrated into the design from the outset and
considered with the Road Construction Consent
application.
The Council will refer all major planning applications
and local developments that have particular security
issues to the Police Architectural Liaison service for
their comments. Developers are encouraged to make
early contact with the Police Architectural Liaison
service.
Secured by Design is the Police’s initiative to design
out crime in the built environment. This has many
benefits. However, sometimes there can be a conflict
between the needs of Secured by Design and planning
requirements. It is important that these matters are
understood early in the process so that they can
be addressed without compromising the design as
a whole. Meeting the needs of Secured by Design
should not be at the expense of the overall quality of
the external space within the site.
Active frontages and housing—Marchmont Tenement
Traditional tenements (above) have main doors directly into
ground floor flats which maximises activity on the street and help
ensure front gardens are used.
Active frontage on a supermarket—West Port
This image demonstrates that it is possible to create an active
frontage for uses such as supermarkets. This has been achieved
by arranging shelves and counters perpendicular to windows so
allowing views into the shop.   
144

Page 139

92
2.14   Waste Management
Provide adequate storage for waste and recycling.
Local Development Plan policies
• Des 6 Sustainable Buildings
The storage and collection of waste is an important
consideration in the design of a new development.
Poor waste management practices tend to be
unslightly and can spoil otherwise attractive
developments. Good waste management practices
can encourage more sustainable lifestyles and help to
achieve recycling targets.
It is important that the integration of waste
management facilities is considered at the outset of
the design process.
City of Edinburgh Council collects household waste
and waste from council buildings. The council does
not collect trade waste.
A waste management strategy is required for all
developments which will have their waste collected
by the council. This strategy should be developed in
association with Waste and Cleansing Services
For other types of development information would
need to be provided regarding how waste will be
stored and collected on the site.
The use of bins with underground storage at Morgans Lane helps to minimise the impact of waste collection facilities.
145

Page 140

93
Process for agreement with Waste and
Cleansing Service
As part of the planning process, designers /
developers of any housing development must
engage with the Council’s Waste and Cleansing
Service to agree a waste management strategy for
the development, and ensure that their requirements
can be satisfactorily incorporated within the
design. This must happen as early as possible.
Waste and Cleansing Services can be contacted on
wasteplanning@edinburgh.gov.uk
Type of Premises Contact with Waste
and Cleansing
Type of Advice Given
Housing Required Detailed advice (Instructions for Architects and Developers)
to support agreement over full waste management strategy for
development.
Mixed housing
and other, e.g.
commercial
Required Detailed advice (Instructions for Architects and Developers) to
support agreement over full waste management strategy for housing
element only.
Can give only high level advice about need for waste segregation
and off street storage of waste bins for other (commercial) elements
of the development.
Commercial only High level advice
can be given
Can give only high level advice about need for waste segregation
and off street storage of waste bins.
Council building,
e.g. school, etc
Required Can give only high level advice about need for waste segregation
and off street storage of waste bins, but may be able to provide more
information based on experience of similar buildings. Need to agree
access and operational requirements for collection crews.
The table below sets out who should contact Waste
and Cleansing Services and the level of advice they
would provide for different types of development.
The officer in the Waste and Cleansing Service will talk
you through their requirements (i.e. vehicle tracking
drawings for refuse vehicles and the location and
sizes of waste storage spaces) and the Instructions
for Architects and Developers document. Once
agreement has been made, Waste Services will issue
a letter of agreement detailing this and any further
requirements.
Key points for consideration:
Your waste management strategy must ensure that:
• Surface waste collection and storage infrastructure
should be minimised on all new developments. The
delivery of underground waste storage systems
with surface collection chutes are the Council’s
primary option for meeting this aim where shared
communal bins are used. Applications should
clearly demonstrate that this option has been
explored with the Council’s Waste and Cleansing
Service at the outset of the design process and it
should only be discounted if there are constraints
which cannot reasonably be overcome, such as the
presence of important underground archaeology or
specific operational constraints.
• Bins are safely accessible and the collection system
is operationally viable, taking into account swept
path analysis, walking and pulling distances,
slopes, vehicle sizes, access to bin stores,
interactions with pedestrians, etc.;
• The waste management strategy is compliant
with the Council’s policies and the requirement of
Scottish legislation so that provision is made for the
full range of recycling services and that these are
fully integrated into the collection system (e.g. that
each bin store has sufficient space to accommodate
the full range of bins);
Technical guidance
146

Page 141

94
• That consideration has been given to the
presentation of bulky waste as outlined below;
• If an underground waste storage system cannot
be accommodated, a decision is made regarding
the use of above ground individual or communal
bins, the initial supply for these and their ongoing
maintenance. If above ground storage is the only
feasible option it should be within a suitable
housing/building; and
• That arrangements are in place to allow for the
ongoing maintenance and repair of waste storage
areas, above ground waste collection chutes, bin
housings etc.
Sizes and bin types:
If it is not possible to deliver an underground waste
storage system, the Waste and Cleansing Service
will advise you whether individual or communal
bins should be used. A range of bin types may be
employed from kerbside collection boxes for glass and
some other materials right up to 3200 litre communal
bins. The Waste and Cleansing Service will advise
on the capacities required to provide for each waste
stream, the detailed design requirements for bin
stores etc.
The specific materials which are currently collected
from households, and in compliance with Scottish
legislation are:
• Residual (landfill waste);
• Food;
• Glass;
• Mixed recycling; (including paper and card, cans
and foil and mixed plastics)
• Garden waste (chargeable service in kerbside
collection areas only); and
• Small electricals, batteries and textiles (collected in
the glass collection box in kerbside collection areas
only).
In addition to ensuring that there is sufficient space
for all collection streams, and that containers are
stored off-street, consideration should also be given
to arrangements for the management of bulky waste-
for example where householders should present items
on collection day.
Underground bins for residual waste allow large volumes to be
held with minimal impact on the street scene.  It is important that
the Council’s Waste and Cleansing Service are involved early, as
their requirements may impact on the design.
Leith Fort -
These carefully designed bin stores are discrete but easily
accessible.
Technical guidance
147

Page 142

95
3.  Designing places: landscape, biodiversity and the water environment
The key aims are for new development to:
• Create a robust landscape structure as an integral component at all scales of development, which follows green infrastructure and green/
blue network principles.
• Meet the requirements of the Council’s strategy for public open space and provide residential private gardens.
• Maintain the conservation status of protected sites and species, and enhance, connect and create new habitat.
• Protect trees and woodland and provide new tree planting.
• Ensure that hard landscape and car parking are an integral part of the overall design.
• Design developments to ensure that properties are not at risk of flooding from coastal waters, rivers, culverted rivers, or surface water
flooding.
• Integrate Sustainable Urban Drainage Systems into the landscape design of development to reduce flooding and pollution, provide
biodiversity benefits and create beautiful places.
• Ensure a mechanism is put in place for the establishment and long term maintenance of new landscape areas.
This chapter sets out the Council’s expectations for landscape proposals as part of new development and how
biodiversity should be maintained and enhanced. In order to achieve good design, landscape architects should be
engaged early in the design process so to be able to influence and inform a masterplan layout. This chapter also sets
out the Council’s expectation with reference to the water environment.
148

Page 143

96
3.1   Green infrastructure and green/blue networks
Establish a robust framework of multifunctional
green infrastructure in new developments of all
scales, and connect this to the wider network of open
spaces, habitats, footpaths and cycleways beyond
the site boundary.
Local Development Plan policies
• Des 2 - Co-ordinated Development
• Des 3 -   Development Design
• Des 5 -   Development Design
• Des 7 - Layout Design
• Des 8 - Public Realm and Landscape Design
• Des 9 -   Urban Edge Development
• Des 10 - Waterside Development
• Env 10- Development in the Green Belt and
Countryside
• Env 12 - Trees
• Env 13 -15 - Nature Conservation Sites of
International/National/Local Importance
• Env 16 - Species Protection
• Env 18 - Open Space Protections
• Env 19 - Protection of Outdoor Sports Facilities
• Env 20 - Open Space in New Development
A green/blue network is formed when green
infrastructure components are linked together to
give additional combined benefits. Components can
include:
• Green corridors;
• Watercourses;
• Woodland;
• Tree belts;
• Habitats;
• Parks, play areas and other public open spaces;
• Sustainable Urban Drainage Systems (SUDs);
• Green roofs/walls;
• Active travel routes; and
• Street trees, hedgerows, verges.
Ideally a network of multifunctional greenspaces
should run through the urban area, urban fringe and
wider countryside, creating a high quality landscape
and townscape. This should support new access
and recreational opportunities, incorporating flood
management, enhanced biodiversity and habitat
connectivity. Multi functional green spaces can
promote healthier life styles through increased
walking and cycling opportunities and creating spaces
for food growing and restorative outdoor activity.
Delivery of such a network is consistent with the
development of the Central Scotland Green Network
and can support a healthy urban ecosystem based on
natural processes. Green infrastructure and green/
blue networks also make an important contribution to
climate change adaptation and mitigation.
The Local Development Plan identifies Edinburgh’s
established green/blue Network, comprising
greenspaces distributed across the city’s hills,
neighbourhoods and waterfront. These are connected
by wooded river valleys, disused rail corridors, the
Union Canal and frequented paths.
The Local Development Plan identifies proposals
to improve connections within the urban area, the
surrounding countryside and neighbouring Council
areas. It is complemented by Open Space 2021,
the Council’s Open Space Strategy, which defines
standards and actions to improve access to good
quality greenspace across the urban area.
The Scottish Government’s Green Infrastructure:
Design and Placemaking guidance illustrates how
green infrastructure can be integrated within new
developments during the design process.
An understanding of a site’s current and potential
contribution to the green/blue network should inform
decisions on scale, location and layout. The way in
which this has been considered in the placemaking
process should be explained in the Design Statement/
Design and Access Statement.
149

Page 144

97
Development should be carefully designed to
contribute positively to the expansion of green/blue
networks. All proposals will be assessed in terms of
their consideration of connectivity between green
infrastructure components and their contribution
to national and local green/blue network and open
space objectives.
Regard should be given to linking development
sites with Edinburgh’s network for nature, making
links to habitats found in local nature reserves, local
nature conservation sites and the Edinburgh Living
Landscape.
Large public open space— Figgate Park
This public park is a major component of the green/blue network.
150

Page 145

98
These sketches illustrate how green/blue networks
can be integrated within a range of development
scenarios and at different scales.
The Council supports substantial framework planting
that seeks to integrate and connect multi-functional
green infrastructure features as guided by site
specifics and local landscape character.
Masterplans will require adequate space for large
growing native tree species to achieve maturity and
form woodland habitat, provide a secure setting to
multi-user paths, cater for active travel, a variety
recreational uses within open space, incorporate
SUDS, whilst allowing integration with the street
layout and built form. In urban edge situations, a
landscape edge will also be required to integrate
development with the surrounding countryside and
landscape setting of the city.
These provisions can vary in width depending on
the development scenario but for some major
developments spatial parameters of 30-50m may
be necessary to accommodate a full range of green
infrastructure functions. Any such woodland and tree
belt planting would benefit from being established
early so they can provide visual screening and shelter
as soon as possible.
If buildings are proposed close to a watercourse, a
full appraisal of flooding scenarios is required (see
section 3.8) and early discussions with the Council’s
Flood Risk Unit. Buildings proposed on brownfield
sites, adjacent to water courses except in exceptional
circumstances, require at least a 15m setback to
create opportunities to reinstate natural bank sides.
In order to promote natural bankside conditions, only
riverside walls with significant archaeological value
should be retained. Other retaining walls should
generally be replaced with soft engineering solution.
In areas of historic importance mitigate the potential
for natural banks by the use of other methods such as
reducing the top part of the wall to provide a wetted
bank or cladding on the retaining wall to provide some
riverine habitat with tree planting to provide habitat
connectivity.
Green/Blue Networks
Green/blue networks can be aligned with watercourses or permanent (retention) ponds or detention areas providing for Sustainable
Urban Drainage, to enhance existing wildlife habitat, whilst providing for amenity, recreation and active travel. New development should
provide active frontages to main path routes, open spaces and SUDs features.
50% watercourse open to
natural light
Watercourse or pond swale or
filter trench
multi-user path
maintenance access
front gardens, street
front or open space
new planting/
existing vegetation
6 - 20m 2 3.5 - 4.5 2.5 - 5
Water of Leith Walkway
Access and amenity improvements carried out at The Dene,
between Dean Terrace and Mackenzie Place, within the New Town
Conservation Area.
Technical guidance
151

Page 146

99
indicative dimensions to
conform with street design
guidance
2m
4m for shared cycles/pedestrians
3.5–5m 5.5m 2 2
footway &
services
verge &
street tree
verge & filter trench
or swale
Green Street
The incorporation of trees and other planting within street design should be considered alongside the spatial parameters for movement
and access - including visibility, services, lighting, the proposed approach to sustainable urban drainage and the intended density and
spatial definition of the proposed built form.
North Meadow Walk
North Meadow Walk footway and cycleway, providing for
recreational use and active travel. The route is lined with large
growing tree species, includes nesting boxes and is set within a
broad grass verge. The path is lit and surveillance is provided from
surrounding residential dwellings.
Forrest Road
This street extends the tree lined avenue of Middle Meadow Walk
to George IV Bridge.
Green Corridor
This density and type of planting is suited to the urban situation and parkland context. Where a rural context exists at the urban
edge, native woodland may achieve a more appropriate fit with surrounding landscape character whilst providing shelter for new
development.
5 - 8m 3.5 - 4.5 2 20 - 40m
front gardens/
street front
multi-user
path
swale or
filter trench
clearance for
planting
informal woodland
trail, avenue or
woodland
Technical guidance
152

Page 147

100
3.2   Publicly accessible open space
Ensure homes are within walking distance of good
quality and well designed open space.
Provide new publicly accessible and useable open
space in non-residential development.
Ensure that open space is attractive and functional. 
Local Development Plan policies
• Des 5c - Development Design
• Des 7 - Layout Design
• Des 8 - Public Realm and Landscape Design
• Env 18 - Open Space Protections
• Env 19 - Protection of Outdoor Sports Facilities
• Env 20 - Open Space in New Development
All homes should be within 400 metres walking
distance (equivalent to a five minute walk) of a ‘good’
quality, accessible greenspace of at least 500 square
metres.
In new housing developments, good quality local
green spaces should support health and well-being by
providing useable outdoor spaces as well as looking
attractive.
Spaces should have surfaced paths linked to the
surrounding area, provide features to attract wildlife,
incorporate seating or walling, cycle parking and
waste bins, fruit trees and raised beds for community
growing and provide a safe and stimulating place for
unequipped play.
Urban tree planting and the use of hedges and shrub
planting should be considered to define spaces
and create appropriate shelter and shade. Areas
of open grass should be balanced with the use of
herbaceous perennials and bulbs to create year round
interest.
Local greenspaces can be complemented by drainage
features, such as grass or planted swales and rain
gardens. Where it is proposed that part of a local
greenspace should be used to accommodate below
ground surface water storage, there should be no
impact on the quality or use of above ground space e.g.
through restricting locations for tree planting or the
need for inspection chambers.
Good quality local green spaces should complement
the provision of private gardens for new houses, blocks
of flats, garden flats and communal back greens.
The Council’s Open Space Strategy sets standards
to ensure that all communities have access to quality
greenspaces, which cater for a variety of needs
and ages. Greenspaces provided as part of new
development must be usable space suitable for a
range of functions.
Local greenspace standard:
Local greenspaces close to homes play an important
role in how people feel about their neighbourhood
and offer convenient spaces for everyday enjoyment
of the outdoors.
They can be important places to meet neighbours,
havens for wildlife, spaces to play after school or
enjoy on a walk to the shops.
New local greenspace, Lochend
Small open space in the the Old Town—Trunk’s Close
It makes good use of its constrained site and provides an
attractive green setting for surrounding buildings.
New local greenspace, Lochend
153

Page 148

101
Large greenspace standard:
Every neighbourhood should benefit from a large
park to provide space for the whole community to
enjoy their free-time. It is a place to exercise and play
informal ball games; walk the dog or go for a run;
come together for local events; watch wildlife and
scenery through the seasons; and experience natural
open space.
All homes should be within 800m walking distance of
a good quality accessible greenspace of at least two
hectares.
Where possible, new large greenspaces should
incorporate existing built, cultural and natural
features, including skyline views to celebrate
distinctive local characteristics (Section 1.8). The
overall size and form of parkland should, therefore,
respond to the topography and the opportunities of
the site.
The provision of facilities should ensure that spaces
are well used, lively, safe and resource efficient by
delivering multiple benefits; in particular providing an
uplifting place to support daily self-management of
physical health, including opportunities to participate
in group activities.
Larger greenspaces should meet local greenspace
needs, through the provision of sheltered community
garden areas with seating and cycle parking, as well
as larger scale features appropriate to their size.
New parkland provides the opportunity to create a
landmark feature, including woodland and forest
scale trees; provide well drained, level ground for
community events, markets, informal ball games,
outdoor learning and exercise activities; measured
walking and running circuits, with links to the wider
green/blue network, and integrate orchard and
allotment provision. Further details can be found
in the Council’s Allotment Strategy and Scotland’s
Allotment Design Guide.
Grassland management approaches may include a
mix of close mowing, naturalised grass or meadows.
The use of planted swales and the location of surface
water storage basins alongside and in addition to new
parkland, can bring amenity and biodiversity benefits,
by creating wetland habitat and introducing open
water as a feature of the landscape.
Path surfaces, within greenspace, should be
appropriate to context and are an important factor to
encourage the use of the outdoors.
A grass edged multi-user path with Macadam
wearing course will generally provide the most
robust long-term solution, providing access for all
including wheelchair users and pushchairs. This
can be enhanced by the use of rolled stone chips.
Bound gravel may be suited to local greenspaces
or feature spaces. Whin dust paths will generally
only be acceptable in semi-natural settings, subject
to appropriate build up, drainage and ongoing
maintenance.
The relationship of new parks to homes, schools,
other public buildings and commercial uses can
help put open space at the centre of community
life and provide options for refreshment and use of
conveniences. New greenspaces should be directly
overlooked from key living spaces such as lounges
and kitchens and never blank facades.
Aerial view of Broomhills Park (Barratt East of Scotland Ltd)
154

Page 149

102
Forth Quarter Park
Forth Quarter Park was developed for National Grid
Property Ltd as part of the Granton Waterfront master
plan to remediate the former gas works.
This distinctive seven hectare park is bordered by
a mix of uses including office accommodation to
the east, Edinburgh College’s Granton campus, and
the established communities of Granton, Pilton
and Muirhouse, together with new homes being
developed at the Waterfront.
The park links the North Edinburgh paths with
the promenade at Silverknowes to the west, via a
meandering route through this key urban greenspace.
Lying close to the Firth of Forth, the park provides
views from the city to the coast and a backdrop of hills
within Fife.
A central water feature is crossed by bridges and a
waterside walk including decking was formed by de-
culverting the Caroline Burn.
The east end of the park is where the water feature
terminates at a new public square and terraced
viewing platform in front of the Scottish Gas
headquarters.
New planting including 800 birch trees, 15,000 shrubs
and new grassland arranged in a series of undulating
terraces, surrounding the water feature, creates
wetland and marginal habitats.
The park also incorporates Lime trees, which are
remnants of the grounds of Granton House.
Playspace access standard:
Edinburgh’s vision is to achieve a ‘play friendly city,
where all children and young people can enjoy their
childhood.’
Parks and other large green spaces provide the ideal
setting for good quality equipped play spaces. Play is
vital to help children learn how to get along with each
other and keep healthy.
The Council’s Open Space Strategy sets out the
playspace access standard and is linked to the Play
Area Action Plan. Houses and flats should have
access to at least one of the following:
• a space of good play value within 800m walking
distance;
• a play space of very good play value within 1200m
walking distance; and
• a play space of excellent play value within 2000m
direct distance.
Play Value measures the quality of play area design
and layout, together with a range of play activities on
offer to ensure children receive the right balance of
risk and challenge in order to develop physical and
social skills.
Technical guidance
155

Page 150

103
Terraced slopes and shared surface ‘home zone’ street at
Gracemount.
New play area in Granton meets ‘good’ play value.
In addition to equipped play spaces, new green
spaces and residential streets should be designed
to encourage more ‘free play’ without equipment.
Exploring woodland, meadows or running up and
down slopes can provide ways for children to develop
their creativity and imagination.
All residential developments should contribute
towards these standards by providing publicly
accessible open space on site. Where this is not
possible, contributions may be sought for the
improvement of open space within the area.
Non-residential development will also be required
to provide new open space, justified by the scale of
development and the needs it gives rise to.
Quality in new greenspace and play areas should
be ensured by planning for these elements of
green infrastructure as an integral element of place
making from the start of the planning process. New
greenspace provision should be informed by an
understanding of local community needs, including
health and wellbeing and establish the necessary
framework for new neighbourhoods to thrive.
Making provision for facilities such as community
gardens, growing spaces, orchards, woodlands
and allotments within new greenspaces can allow
both new and existing communities to have a
greater influence on how places develop over time,
strengthen bonds and contributes to the sustainable
management of the city’s greenspace resources.
The design of new open space provision will be
assessed against Local Development Plan policies
relating to Design and the Environment. Play area
design must achieve the play value requirements set
out in the Council’s Play Area Action Plan.
Technical guidance
156

Page 151

104
3.3   Private open space
Provide well defined, functional, good quality private
gardens to all houses and ground floor flats.
Local Development Plan policies
• Des 5d - Development Design
• Hou 3 - Private Green Space in Housing Development
There should be a clear distinction between
public and private spaces, defined by appropriate
boundaries such as walls, railings or hedges both to
the street edge and between feus.
Private and communal gardens should be designed
for use by residents for a range of functions, including
space for play, seating, food growing, tree planting
and drying laundry. Outdoor taps and/or rainwater
harvesting may be needed. Wooden fencing can be
used to separate private back gardens, but should not
be used in the public realm.
Consideration should be given to different heights
of fencing to allow the communication between
neighbours and to add some visual interest.
A key factor in ensuring space is usable is its capacity
to receive sunlight. This will be affected by the
position of existing and proposed buildings, as well as
tree planting.
The Council wants new development to be adaptable.
To help meet the changing needs of residents, it is
beneficial for there to be sufficient space in gardens
for houses to be extended while retaining reasonably
sized gardens. Developers should demonstrate how
this can be achieved.
Ground floor flats should generally be provided with
private gardens of a minimum depth of 3m, which
open directly on to communal gardens. Where this
is not the case, patio doors and a defined threshold
space should be provided.
A clear distinction—Marchmont
It is clear what is public and private space in traditional
tenements. The buildings enclose shared gardens making them
private.  At the front , the walls and hedges separate the public
street from the private gardens. 
Private front gardens have an important role in
softening urban environments by providing planting
on streets. They also provide an intermediate space
between the public realm and the privacy of dwellings.
The impact of driveways on the continuity of boundary
treatments and street tree planting should be
considered. (Note: relationship to parking section and
definition of private front gardens/ thresholds).
Little private space can be successful—Lady Stair’s Close
There is very little private outdoor space in the Old Town.  This is
compensated by the outstanding quality of the public spaces in
the form of closes and courtyards. 
157

Page 152

105
Where private gardens cannot be provided or where
their depth is limited (for example less than 3m), there
will be a greater need for street trees to be provided.
Private communal grounds should be well
proportioned, well orientated and secluded from
vehicles. Narrow peripheral spaces, subject to
overshadowing will not be acceptable. Residents
should not normally have to cross streets and car
parking to access private communal greenspaces. The
provision of private communal gardens for HMO’s is
encouraged.
Where it is difficult to achieve the areas normally
required for private open space - for example, because
of a need to adhere to a spatial pattern in an area, the
inclusion of balconies or roof terraces may be seen
as a mitigating measure. Where they are included, it
should be demonstrated that they will benefit from
adequate sunlight or have an outstanding view,
preserve reasonable privacy and have an area that is
not less than 5% of the net floor area of the dwelling.
The size of gardens can contribute to the character
and attractiveness of an area. This is particularly
the case in villa areas. Gardens of a similar size to
neighbouring gardens are likely to be required in
order to preserve the character of the area.
Residential Homes and Care Homes
Particular attention should be paid to the orientation
of care homes and long term residential homes.
Residents should be able to access a garden space
that is attractive, welcoming, well lit by natural light
throughout the year, and which allows a circuitous
walking route to be created.
Private and shared gardens for flats.
This drawing is sliced through a courtyard development to show its interior and street side. It shows small private front gardens with
private rear gardens opening on to a communal space.
Gardens in the centre of the picture are longer than 9m allowing the houses to be extended. 
Additional space is also required in gardens where there is insufficient natural sunlight. North facing gardens should be longer to
compensate for this (see Section 2.10).
Private garden grounds need to be of an adequate width and shape to be attractive and useable for residents.
The length of private gardens
Gardens should be designed to allow them to be used for a range of activities and for houses to be adapted and extended over time. This
means that gardens longer than 9m are encouraged. This also ensures that neighbouring amenity can be protected. Excessive changes
in level should not be taken up across private back gardens. Where housing is set out across sloping ground, useable terraced space
should be provided. High retaining walls should be avoided.
Technical guidance
158

Page 153

106
3.4   Biodiversity
Maintain the integrity of Sites of European, National
or Local Importance for biodiversity and geodiversity.
Conserve protected species and the habitats which
support them.
Survey and assess development sites in terms of
biodiversity.
Design sites to maintain and develop a varied and
robust ecosystems, achieving biodiversity net gain.
Local Development Plan policies
• Des 3 - Development Design
• Des 10 - Waterside Development
• Env 12 Trees
• Env 13 - Nature Conservation Sites of International
Importance
• Env 14 - Nature Conservation Sites of National
Importance
• Env 15 - Nature Conservation Sites of Local
Importance
• Env 16 - Species Protections
The Council has a broad approach to conserving
nature considering ecosystems and natural processes,
as well as conserving designated or protected sites
and species. There is a recognition of the importance
of green/blue networks, wetlands, woodlands and
areas of open space to maintain biodiversity and
allow ecosystems and natural processes to provide
multifunctional services such as flood control,
pollution control and community wellbeing.
This chapter provides the guidance for decisions on
developments that can affect wildlife and sets out key
information about designated sites.
There are several designated sites within Edinburgh
that carry statutory protection at the European,
National (UK and Scottish) and Local levels.
International sites 
Internationally designated sites in Edinburgh, have
protection under European law and are commonly
known as European sites. They comprise of Special
Protection Areas (SPA) - designated for their birds
under the EC Wild Birds Directive (2009/147/EC).
National Sites
Nationally designated sites include Sites of Special
Scientific Interest (SSSIs) which are notified for their
special interest of their habitats, flora, fauna, geology
or geomorphology.
Local sites
Non-statutory designations including, Local Nature
Conservation sites, which are either Local Biodiversity
Sites or Local Geodiversity Sites are protected through
the implementation of specific planning policies. 
Protected species in Edinburgh
Most bird species and a wide range of animals and
plants have general protection from deliberate
damage or harm under the law. In addition, some
species, such as otters, bats and great crested newts
have special protection from disturbance and harm
under European legislation. These are known as
European protected species (EPS).
A number of species, such as water vole and badger
are protected under domestic legislation. Species with
special protection are as follows: 
• European Protected Species (protected under
Schedule 2 (animals) and 4 (plants) of the Habitats
Regulations 1994 (as amended)
• Birds, animals and plants listed on Schedules 1, 5
and 8 (respectively) of the Wildlife and Countryside
Act 1981 (as amended)
• Badgers (protected by the Badgers Act 1992 (as
amended)
The presence on or near a site of a species with
special protection is a critical consideration when
preparing development proposals and in the
consideration of decisions on planning applications.
Their presence rarely imposes an absolute block on
development, however mitigation measures will often
be necessary and this can affect the design, layout
and timing of the works.
159

Page 154

107
A licence from SNH will be needed for works which
would constitute an offence involving species with
special protection, this includes works which do not
need a planning application.
It is important that adequate survey work is carried
out in good time to understand the site and determine
the presence or absence of species with special
protection. Expert ecological advice should be sought
at an early stage to determine the likely presence
of protected species and the likely impact of any
proposed development.
Site appraisal and ecological survey
Initial site appraisal
It is important to understand the significance of the
ecology of a development site and the surrounding
area. The extent to which ecological surveys and
appraisals are required will depend on the scale,
nature and location of the proposal. An initial site
appraisal may be all that is needed but, depending
on the findings, further surveys may be required for
particular species or in relation to a particular habitat.
The site appraisal should:
• highlight any designated sites on or near to the
site;
• identify potentially important habitats (e.g.
mature trees, woodland, hedgerows, ponds or
watercourses);
• identify if protected species are likely to be in or
near the site;
• give an indication of the ecological data required for
progressing a planning application; and
• recommend if more detailed surveys will be
necessary.
Where an important species or habitat has been
identified on site, planning applications must be
supported by an appropriate level of information, see;
CIEEM Guidance on Preliminary Ecological Appraisal
Applicants need to provide the following information
to support their planning application:
• information on specific habitats, plants, animals
and geology on and around the site, including its
sensitivity, significance and value.        
• assessment of the potential impact of the
development on these features.        
• details of proposed mitigation measures to avoid or
minimise any adverse impacts.       
• Details of how any unavoidable damage or
disturbance caused by the development will be
compensated.       
• Identification of any licensing requirements and
information demonstrating that a species licence is
likely to be granted (referencing the relevant licence
tests).
Good practice also indicates that, for most significant
developments, an Ecological Impact Assessment
(EcIA) should be required. If necessary the EcIA should
adopt the methodology of CIEEM.
Other surveys which may be required, such as
geology, geomorphology and soils, should also be
undertaken by a suitably qualified and experienced
person.
Soprano pipistrelle bat (Pipistrellus pygmaeus). Image: SNH/
Lorne Gill
Edinburgh Living Landscape:
A pictorial meadow for pollinators and amenity benefit.
160

Page 155

108
No
Is there a good reason to think that protected species could be
present on the site or affected by the proposal?
Have the appropriate surveys been carried out?
Are protected species present or could be affected by the
proposal?
The applicant has
demonstrated through
good design and
mitigation that a
species licence will not
be needed.
The applicant has
demonstrated with
reference to the relevant
licence tests that a
future species licence is
likely to be granted.
Determination of planning application.
Yes
Planning
Application
Stalls
Yes
YesYes
Yes Yes
No
No
No
Protected species – the importance of
providing the necessary information
It is important to consider the constraints and
opportunities that wildlife and habitats may have on
a development proposal at an early stage. Helpful
information including species records and habitat
maps may be obtained from a number of sources
including:
The Wildlife Information Centre
Site surveys and assessments should be undertaken
by a suitably qualified and experienced ecologist.
A list of qualified ecologists can be found in the
Chartered Institute of Ecological and Environmental
Management (CIEEM) Professional Directory. 
cieem.net/i-need/finding-a-consultant/
Good design and mitigation
Opportunities for enhancing wildlife and habitats
must be considered as an integral part of the
development design. Biodiversity benefits can
often be combined with other site requirements.
For instance, Sustainable Urban Drainage System
ponds can provide a habitat for wildlife as well as
contributing to attractive open space.
More information on incorporating green
infrastructure is available in:
Scottish Government Green Infrastructure Design
and Placemaking
SNH Pollinators in Planning and Construction
Guidance
Edinburgh Biodiversity Action Plan 2019-2021
161

Page 156

109
The Mitigation Hierarchy
The mitigation hierarchy should be applied when considering
how to manage the risks of adverse impacts on wildlife and
habitats. Depending on what type of mitigation is proposed,
it may be that there are certain times of the year when
mitigation activities are inappropriate. 
Enhancements
Most developments could incorporate of a range of measures  to
enhance wildlife and habitats. These measures can be discussed
at the pre- application stage and are expected to be included
as part of planning application submissions and subsequently
implemented as part of the development.
Avoid
Reduce
Compensate
Initially efforts should be
proposed to prevent or avoid
impacts
if avoidance is not possible,
measures should be made
to minimise and reduce any
unavoidable impacts
a last resort should be some
sort of compensation planting
or habitat provision - this would
likely be secured by conditions
allied to the grant of any
planning permission.
Pre-application
Consultation
Yes
No
Preparation of
Application
Application
submitted/
resubmitted
Consideration
of Application
Planning
application
determined
• Seek advice from council planning staff on need to consider protected
species (are they likely to be present on site?), key habitats, LBAP
priority species and what the council requires as part of the application.
• Discuss what surveys are required
• Undertake necessary surveys
• Allow time for surveys at correct time of year
• Establish likely adverse impacts of proposed development on wildlife
and habitats
• Establish what mitigation is required and build into site design
• Check on possible need for protected species licences and agree on
information required
Have the impacts on nature been
properly considered and explained by the
applicant?
• Satisfactory surveys submitted?
• Impacts mitigated?
• Appropriate site design?
• Licence issues considered?
The planning process and ecological considerations
Assessment of planning applications
Key considerations in the development management process with regard to wildlife and habitat are
summarised below.
Management
On sites where wildlife features are retained, or new habitats and
features are to be created, appropriate ongoing management must
be put in place.  This is likely to be part of the planning conditions
placed on an application and subject to enforcement if necessary. In these cases, a
management plan would be expected to be produced and submitted as part of the
planning application. It should identify specific actions required for good management
and include details of the phasing of the works.
162

Page 157

110
Habitats Regulations Appraisal (HRA)
Under the Habitats Regulations, decision makers
(known as competent authorities in the legislation)
can only agree to development proposals which
are unconnected with the nature conservation
management of the site after having confirmed that
they will not affect the integrity of the Natura site.
The process of coming to this judgement is commonly
referred to as Habitats Regulations Appraisal (HRA).
It should be established early on if future
development proposals could impact on a European
site. Proposals do not need to be within a European
site to affect its conservation interests. Consideration
must be given to any plan or project that has the
potential to affect a European site, no matter how
far away the site is from the proposed development.
For instance birds that are part of the qualifying
interest of a designated site may feed in areas several
kilometres away. Therefore development may affect a
European site some distance away. 
If a European site could be affected the applicant
will need to provide sufficient information to allow
the council to determine whether there will be a
‘Likely Significant Effect’ (LSE)* on the qualifying
interests of the European site. If there will be a ‘Likely
Significant Effect’, the applicant will need to provide
the council with information to enable it to carry out
an appropriate assessment. 
Development will only be consented if it can be
ascertained that it would not adversely affect the
integrity of the site. The competent authority must
ensure the requirements of the Conservation (Natural
Habitats, &c.) Regulations 1994 as amended are met
before undertaking or permitting any project.
More information on HRA can be found on the SNH
Habitats Regulations Appraisal (HRA)
SNH HRA Firth Forth Guide for Developers and
Regulators
Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA) is a statutory
process which identifies the environmental effects
(both negative and positive) of certain development
proposals. EIA only applies to those developments
that are likely to have a significant environmental
effect by virtue of factors such as its nature, scale
or location. These are identified under Schedule 1
and Schedule 2 of the Town and Country Planning
(Environmental Impact Assessment) (Scotland)
Regulations 2017. If in doubt about whether your
development qualifies for EIA, contact the planning
authority for a screening opinion. 
More information on EIA can be found in Planning
Advice Note 13 (PAN 13) – Environmental Impact
Assessment and on the SNH and CIEEM website. ECIA-
Guidelines 2018 Terrestrial Freshwater Coastal and
Marine
European Protected Species (EPS) and
Licensing Requirements
If potential impacts on protected species that cannot
be avoided through mitigation are identified, a
licence may be required before works can proceed
Licences will only be granted if strict tests are met.
SNH is responsible for the administration of most
protected species licences in Scotland (except most
marine species where Marine Scotland is the licensing
authority). For some species in specific circumstances
licences can be issued which allow disturbance for the
purpose of development or for the purpose of survey
and research.
The three strict legal tests which must all be passed
before a licence can be granted:
• Test 1: that there is a licensable purpose. 
• Test 2: that there is no satisfactory alternative; and
• Test 3: that the action authorised will not be
detrimental to the maintenance of the population of
the species concerned at a favourable conservation
status in their natural range (the qualified ecologist
should be able to provide advice on this or
alternatively seek advice from SNH).
Technical guidance
*Likely Significant Effect is any effect that may reasonably be predicted as a consequence of a plan or project that may affect the conservation objectives of the features for
which the European site was designated but excluding trivial or inconsequential effects. The word ‘likely’ should not be interpreted as ‘more probable than not’ but rather
as a description of the existence of a risk of a significant effect.
163

Page 158

111
More information on the three tests for a species
licence is available in:
SNH Planning and Development Protected Animals
Bat Conservation Trust Publication Bat Surveys
Guidelines
Timing of Ecological Surveys
Ecological surveys often need to be carried out at
certain times of year so they are important to consider
at an early stage of development processes or they
can hold up progress.
ECOLOGY SURVEY CALENDER
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Badgers
Bats - hibernation roosts
Bats - summer roosts
Bats - foraging/commuting
Birds - breeding
Birds - over winter
Great Crested Newts
Invertebrates
Otters
Water Voles
Habitats / Vegetation
Species surveys are weather dependent, so it may
be necessary to delay a survey or to carry out more
than one survey if the weather is not suitable. All
constraints must be clearly reflected in the survey.
Surveys for certain species and habitats may be
required over more than one season, and possibly
covering periods measured in years, for example
developments potentially affecting European sites or
bird flight patterns in relation to wind farm sites. If
surveys have been carried out a significant amount of
time before an application is made, the council may
require further surveys before the application can be
determined or the development is started.
Survey times:
Optimal
Sub Optimal
Preconstruction surveys may need to be done
once consent is granted for mobile species whose
distribution may change over time.
Technical guidance
164

Page 159

112
Invasive Non-Native Species
The Wildlife and Natural Environment (Scotland) Act
2011 has introduced measures to deal with invasive
non-native species. If a survey shows these or other
invasive non-native species are present on a site,
developers must remove them and ensure that they
do not spread from the site. The most likely way in
which invasive non-native species may be introduced
to a development site is through soil contaminated
with seed or root material.
If large volumes of soil are moved or introduced
to a site, the planning authority will require a soil
sustainability management plan. If a development
is responsible for the introduction of an invasive
non-native species, either within or out-with the site,
the developer will have to remove the species and
dispose of material appropriately.
Japanese knotweed, giant hogweed and Himalayan
balsam are regarded as controlled waste. Developers
should seek advice on the disposal of these plants
by referring to the Scottish Environment Protection
Agency (SEPA) website, see www.sepa.org.uk  and
www.netregs.gov.uk 
The Scottish Government has produced a Non
Native Species Code of Practice that will help those
developing land that contains these plants to
understand their legal responsibilities.
Statutory requirements
The Council must ensure statutory requirements
relating to biodiversity are being fulfilled. The
framework for statutory sites and species protection
is provided by:
• Conservation (Natural Habitats &c.) Regulations
1994, as amended (“The Habitats Regulations”);
• The Town and Country Planning (Environmental
Impact Assessment) (Scotland) Regulations 2017;
• Wildlife and Natural Environment (Scotland) Act
2011;
• Nature Conservation (Scotland) Act 2004;
• The Protection of Wild Mammals (Scotland) Act
2002;
• Protection of Badgers Act 1992; and
• Wildlife and Countryside Act 1981 (as amended).
Technical guidance
Otter (Lutra lutra)
Otters are active on several watercourses in Edinburgh and any
development within 200 m of suitable water habitat should survey
for this European Protected Species. Picture SNH/Lorne Gill.
165

Page 160

113
3.5   Trees
A suitably qualified Arboriculturalist should be
used to survey and evaluate the existing tree and
woodland resource within the site and 12m beyond.
Design development to take into account above and
below ground constraints for retained trees and
future planting.
Survey, assess and identify trees to be retained.
Mature trees in a good condition have a high value
and should be retained where possible.
Protect retained trees and areas identified for new
tree planting during construction.
Ensure trees for retention are marked on
masterplans.
Local Development Plan policies
• •Des 3 - Development Design
• •Env 12 - Trees
Trees and woodlands are important for the quality
and character of the landscape, the townscape,
biodiversity, cultural heritage, ecosystem services
and our sense of well-being. Protection of trees and
woodland within new development can give a sense of
maturity and raise the overall quality of the setting of
buildings whilst contributing to green/blue networks.  
Where trees are damaged and then decline or where
inappropriate design leads to conflict, these positive
benefits are lost. Successfully marrying trees and new
development requires a process of survey, analysis
and design which is set out in the British Standard
(BS) 5837:2012 Trees in relation to design, demolition
and construction. This provides a balanced approach
on deciding when trees should be retained, how
design considerations will be affected by existing
trees and appropriate protection for trees during
development.
It is of key importance to conserve and maintain existing trees,
especially where they are old and large. The larger the tree and
tree canopy the greater the environmental and landscape benefit.
Ancient woodland near Balerno
This ancient woodland makes an invaluable contribution to
biodiversity and landscape character.
Former City Hospital - Greenbank
Existing mature trees retained within new green corridor.
166

Page 161

114
A tree survey is required in the form specified in BS
5837:2012 for all trees with a stem diameter of 75mm
or more, at 1.5m above ground on the site or within
12m of its boundary. Trees should then be categorised
in accordance with their quality and suitability for
retention.
In certain cases woodland may be surveyed
as a whole and managed using best woodland
management principles. Using this information, a
Tree Constraints Plan should be prepared to show the
below and above ground issues that need to be taken
into account during the design process to ensure
successful survival of these trees.
Below ground, the Root Protection Area (RPA) must
be identified for each tree, to be left undisturbed
and protected from damage from building, road
construction or service trenches and layouts of SuDS.
Above ground, the physical requirements for future
growth and maintenance will include, for example, the
ultimate height and spread of each tree. Opportunities
for future planting should also be identified and
plotted on the Tree Constraints Plan to identify areas
for protection from soil compaction.
Input to the design layout also requires consideration
of factors such as the effect trees may have on
daylight, shading of buildings and open spaces,
privacy, screening, wind throw and amenity issues
with leaves from certain species.
Visibility splays, location of services, changes of
level and allowance for construction activity will
also be considered. When submitted with a planning
application, the Tree Constraints Plan should
demonstrate how consideration was given to the
retention of trees in the proposed site layout.
Once the layout is finalised, a Tree Protection Plan
should be submitted showing trees for retention
and removal, and the precise location of protective
barriers and ground protection forming the
Construction Exclusion Zone. Protective barrier
fencing should be to the standard shown in Figure 2 of
BS 5837:2012.
These will be erected before work starts on site and
maintained throughout the construction phase.
Tree Preservation Orders, as set out in the Tree
Protection Charter, will be used to safeguard trees in
appropriate cases.
It is a duty under Section 159 of the Planning Act
(1997) that conditions must be applied to all planning
applications where existing trees require protection.
Developers should be aware of the responsibility to
determine the presence of bats (a European protected
species) and identify potential bat roosts on site and
the effect of proposals on habitat and navigation
features. See section 3.4. Biodiversity.
Summary of process
1. Carry out a tree survey and categorisation to
identify trees worthy of retention.
2. Prepare a Tree Constraints Plan showing
physical and spatial requirements for
retaining those trees. This includes a Root
Protection Area for each tree and an indication
of the ultimate spread of canopy. Include any
proposed tree work to retained trees (e.g.
crown reduction, pruning etc.).
3. Use Tree Constraints Plan to design an initial
site layout and identify areas for new planting.
4. Achieve finalised site layout.
5. Prepare a Tree Protection Plan, plot the Root
Protection Area of retained trees, including
the location of protective barrier fencing
with specification, ground protection and
provision of on site supervision, showing the
Construction Exclusion Zone.
6. Submit with Planning Application.
7. Planning approval with tree protection
conditions relating to the approved Tree
Protection Plan.
8. Prior to start of construction, erect tree
protection fencing and other identified
measures to form a Construction Exclusion
Zone.
9. Ensure site supervision to maintain tree
protection fencing and measures until removal
agreed.
Technical guidance
167

Page 162

115
3.6   Planting
New planting proposals should be prepared
by a suitably qualified Landscape Architect or
Arboriculturalist (for trees).
Species selection should be appropriate to the
intended location, function and growing space,
taking into account ultimate height and spread, and
relationship to buildings, paths and roads.
Where possible, use native species in locations
adjacent to designated nature conservation sites. In
other areas use a mix of species to provide ecological
diversity and resistance to disease.
Planting design should recognise Edinburgh’s
distinct landscape characteristics and provide an
attractive, biodiverse and a long-lived landscape
structure to help mitigate against climate change.
Woodland and structure planting should be carried
out in advance of development to allow early
establishment.
Proposals must allow for ease of maintenance and
long term establishment.
Local Development Plan policies
• Des 3 - Development Design
• Des 8 - Public Realm and Landscape Design
• Env 12 - Alterations and Extensions
• Hou 3 - Private Green Space in Housing Development
An attractive and functional landscape scheme should
use trees, shrubs, hedgerows, herbaceous perennials,
ground cover and hard landscaping imaginatively to
provide an appropriate setting for buildings. It can
assimilate and integrate new development into the
locality.
All planting schemes should add to the biodiversity
of the area by maximising structural diversity and
providing for pollinators. They should provide all year
round interest, and be playful landscapes that can be
used by all age groups. Poisonous plants should be
carefully specified and not used in housing schemes,
school or nurseries. Bulb planting should be used to
create early spring interest.
Trees in particular make a positive contribution
to both urban and rural landscapes and new
development should provide a spatial framework of
new tree and woodland planting. Large stature tree
species should form the basis of structure planting
and adequate space allowed for their ultimate size.
Housing proposals and major planning applications
should provide sufficient space to accommodate at
least 20% of long-lived large scale trees to provide a
legacy for future generations.
Edinburgh’s heritage of round crowned deciduous
trees should be respected in planting schemes; in
particular, mature trees of high value should be
retained wherever possible. The creation of wooded
ridges should be included in proposals wherever
practicable.
Birch Trees - Forthquarter Park
168

Page 163

116
Trees should be used to create special places in
housing proposals, for example using orchards and
fruit trees, horse chestnut trees (conkers) etc.
Any unavoidable removal of trees should be
compensated by replacement with at least extra heavy
standard sized trees or semi-mature stock in locations
where amenity is a key consideration.
At the site layout stage, the landscape framework
should set out locations to provide suitable conditions
for tree planting. This may include planting in open
ground, such as greenspaces but also locations
within hard surfacing, where careful site planning and
detailed design will be required.
The correct species should be selected for the
intended location, taking into account ultimate height
and spread, the character of the local area and its
environmental and climatic conditions. The proposed
landscape framework should be achievable and so
siting of buildings, proximity of underground PU
services, street lighting columns and drainage all
need to be considered as well as road signs, parking
and CCTV as appropriate.
Within hard surfaces, the use of structural soils or
underground cellular systems will be required to
provide a load-bearing paved surface. The objective
is to prevent compaction of the soil beneath hard
surfaces to accommodate tree roots, soil water, air
and biota.
Tree pits and trenches should be sized to reflect the
nutritional and water requirements of a fully grown
tree. Drainage, aeration and irrigation should also
be installed to aid establishment, in particular where
impermeable surfaces may limit natural rainwater
percolation.
Planting specification
The following minimum standards will apply:
Size at planting Density/spacing Other requirements
Woodland 60-80 cm height. 1m spacing. Include 30% feathered trees of min height 180cm
where immediate visual effect required.
Min 300mm depth of topsoil.  Tree shelters may be required
depending on site conditions (e.g. wind exposure, rabbits, etc).
Trees - green
spaces
Extra heavy standard, 14-16 cm
girth minimum. The Council may
require larger dependent on
location. 
2m clear stem or multi-stem.
Provide a dimensioned tree pit/trench detail with topsoil &
soil ameliorant specification, details of drainage, staking and
accessories.
Trees - paved
spaces
Semi mature, 30-35 cm girth. 2m clear stem, underground guyed. Provide a dimensioned tree
pit/ trench detail to demonstrate adequate soil volume and load
bearing support for surrounding paving. Also include topsoil &
soil ameliorant specification and drainage & accessory details.
Fruit trees Light standard, 6-8cm girth. Spacing and means of support to correspond with intended
shape.
Hedges 60-80 cm height. 250mm spacing
in two offset rows
300mm apart.
Protected by post and wire fencing or similar. Min 400mm depth
topsoil.
Shrubs/fruit
bushes
Dependent on species. 500-600mm apart. Min 3L pot grown unless bare root/root balled
Min 300 mm depth site topsoil.
Planted in groups of 3-5 of same species.
Herbaceous
perennials/
ground cover
Dependent on species. 300 - 450mm
apart.
Planted in groups of at least 7 of same species.
Amenity
Grassland
Specify turf or seed mix g/m2. Min 200 mm site topsoil spread over graded and free draining
subsoil.
Meadow
Grassland
Specify meadow seed mix g/
m2 by type, including dry/wet
meadow, pictorial, woodland
and percentage of each species.
Additional plug plants to be
specified by species and nr/m2.
Use of graded and site subsoil free from compaction.
Bulbs Specify by species, grade nr/m2
and diameter.
Green roofs/
vertical green
walls
Specify whether intensive or
extensive in design.
Ensure sufficient structural capacity and depth of growing
medium.
Specify proprietary matting/wall systems including species mix
and plug plants.
169

Page 164

117
Shrubs, hedges and ground cover plants should
be used to define spaces, provide shelter, privacy,
amenity and enhance biodiversity.
Grassed areas are important for recreational spaces
and bulbs and native wildflower seed mixes should be
used to add seasonal interest and habitat value.
Where space is limited climbing plants and green
roofs/walls should be introduced where practicable.
Proposals within the Edinburgh Airport Safeguarding
Zone should seek early liaison with the Airport on
their planting concepts in order to reach agreement.
Applications for Planning Permission in
Principle
These applications should be accompanied by a
landscape strategy setting out the proposed use and
treatment of external spaces, indicating the location
of services and changes in level, including preliminary
drainage proposals (such as the layout and
maintenance responsibilities for SuDS). The strategy
should include cross sections of typical roads and
streets and green/blue corridors. Key distances from
natural features and a palette of planting material
should also be included.
Full planning applications
Full Applications require all planting and landscape
proposals to be specified as follows:
• Full botanical name of all plant stock or relevant
British Standards (BS 3936-1; BS 5236; BS4043);
• Minimum size of plant stock at planting as per the
National Plant Specification;
• Expected height and spread of trees.
• Planting density, total numbers and planting
locations;
• Grass and wildflora seed mixes and specification;
• Tree pit details, including topsoil & soil ameliorant
specification, drainage, means of support,
protection and accessories; and
• Details of all functioning landscape elements of
Sustainable Urban Drainage.
Management and maintenance
Details of the intended arrangements and proposed
long-term maintenance and management operations
for all landscape proposals should be submitted to
demonstrate that a high standard of landscaping can
be achieved, appropriate to the location of the site.
This includes proposals for the adoption or otherwise
of landscape features within streets. For planted
areas, details of weed control, cultivations, adjusting
tree stakes & ties, firming up, watering, pruning,
fertiliser applications, mulching, litter clearance
and plant replacements of any plant failures should
be provided.  For grassed areas, details of mowing
regimes, weed control, watering, stone removal,
fertiliser and rectifying failures should be provided.  
For many landscape proposals in the city, the airport
operator is required to assess proposed planting and
water features against the risk of attracting birds
which threaten the safety of air traffic. A Birdstrike
Risk Management Plan may be required.
Care should be taken to ensure that community
safety is promoted through the specification and
maintenance of trees and shrubs. Within pedestrian
routes, streets and public open spaces, trees should
maintain good visibility with a minimum clear stem
height of 2m. Shrub planting should also avoid
impeding the opportunity for natural surveillance and
must avoid the creation of hiding places. Where good
visibility is essential shrubs should ultimately grow no
higher than 1 metre.
Hedges and planting should not obscure doors or
windows, and trees should not provide climbing aids
into property or obscure lights or CCTV cameras.
Use of a well composted mulch after planting and
watering can aid establishment, retain soil moisture
and supress weed growth. The use of fertilisers
and soil ameliorants also aid establishment and on
exposed windy sites the use of windbreaks and/ or
tree shelters is recommended.
Holyrood North - high quality public realm and planted
residential courtyards.
Technical guidance
170

Page 165

118
3.7   Hard landscape
Ensure hard landscape design helps reinforce
Edinburgh’s distinctive character.
Co-ordinate materials used in new hardworks design
with the materials used within the surrounding
townscape.
Use stone walls and railings where this is the
commonly used edge detail.
Keep the number of colours and materials in the hard
landscape in a new development to a minimum.
Detail the hard landscape to ensure it has a good
visual appearance that lasts over time.
Local Development Plan policies
• Des 8 - Public Realm and Landscape Design
Streets in new development should be designed in
accordance with chapter 4: Edinburgh Street Design
Guidance and Designing Streets. In particular new
streets should be wide enough to contain cycleways
& footpaths and green verges that are capable of
accommodating street trees. 
In addition to streets and paths, new developments
often include other hard landscape spaces to which
this section applies.
Edinburgh’s hard landscape is defined by the simple,
uncomplicated use of a small palette of materials.
Materials should be chosen to define spaces of
differing functions, public/private spaces and changes
in level.
The materials should be suited to the character of
surrounding buildings and townscape especially
where the buildings are of special interest or
importance. There should generally be continuity
of paving materials along and on either side of the
street.
Detailed design is of particular importance, ensuring
the size of paving is appropriate. Features such
as boundary walls, railings, seating, cycle storage
or stands etc, should all be carefully specified,
coordinated and integrated into the design.
There is a strong tradition of stone walls, railing on
low stone walls or coping and hedges in Edinburgh.
These details should be used to reinforce Edinburgh’s
unique characteristics. Tall boundary walls using
rendering should be used sparingly and detailed very
carefully to shed water.
To mitigate the impact of climate change, a balance
should be struck between paved and planted areas
and between permeable and impermeable paving.
Drainage needs to be robust and uncomplicated.
Narrow planters should be very cautiously used as
boundary elements as they generally fail over the
long term. Timber fencing should not be used in the
public realm unless bespoke and beautifully detailed.
Proposed levels should be carefully designed to tie in
with existing site levels, including on adjacent sites.
Therefore topographical surveys should be extended
beyond the immediate site boundary to ensure this is
possible.
The texture and form of trees improve urban
environments such as squares and contribute to the
quality of the public realm. Trees in hard landscape
need to be carefully specified and have adequate
soil volume, water and air for healthy growth. Raised
planters should generally be avoided since trees are
more likely to suffer restricted growth.
Sibbald Walk
A new square has been formed as part of the redevelopment of
this part of the old town and provides an attractive and well used
route through the area.
171

Page 166

119
The concept and vision for hard landscape design
should be presented in a Landscape/Public Realm
framework for Planning Permission in Principle
applications.
Full planning applications and applications for
approval of matters specified by conditions should
specify the hard landscape with plans and details to
include:
• Location of all hard surfacing materials, (i.e., roads,
footpaths and paving) including their product
specification (e.g., type, finish, unit size, proposed
pattern/ bond and method of laying and jointing). 
Attention should be paid to how changes in level
are addressed, detailing of drainage and the
correct specification of sub-base and materials
where spaces will be subject to vehicular traffic. To
avoid awkward cutting and jointing of units around
existing and proposed features, appropriately sized
or special paving units should be used and carefully
coordinated with the layout of street furniture.
• Details of junctions between surfacing (e.g., kerbs
& edge restraints);
Dundee Waterfront
Use of a continuous tree trench and underground cellular system
to support surrounding paving surfaces as part of advanced green
infrastructure at Dundee Waterfront.
High St
Old Town and other conservation areas
Traditional materials of Caithness flagstones for paving, granite and
whinstone kerbs and setts have been used extensively throughout
the Old Town and will be sought here and in other conservation
areas around the city with the exception of the New Town.
Queen Street
New Town
In the New Town, sandstone should be used as the paving
material.  The paving outside the Scottish National Portrait Gallery
provides a model that should be used elsewhere in the New Town. 
Western Corner
Areas with significant footfall
In other areas with significant footfall, such as local centres
outwith conservation areas, rectangular precast concrete slabs
(coloured grey) should be used.
Shared surfaces outwith conservation areas
Shared surfaces outwith conservation areas need to be kept very
simple.  If block paving is used, there should be no more than two
tones and these should be grey. 
• Details of boundary treatments (e.g., walls and
fencing) including their location and product
specification.  Visualisations also to be provided. 
• Details of new play areas including equipment and
safety surfacing;
• Street furniture including product specification
for any seating, bin & cycle stores, signage,
interpretation panels, etc;
• Public art & sculpture – visualisations and
construction details required. 
Technical guidance
172

Page 167

120
3.8   Water environment
Survey and analyse the existing and historic water
environment on development sites.
Design developments, including the floor level of
buildings, to ensure that properties are not at risk of
surface water flooding.
Provide above ground surface water attenuation on
development sites to reduce flooding, due to the
development, on surrounding areas. Underground
storage solutions should be avoided.
Local Development Plan policies
• Des 3 - Development Design
• •Des 6 - Sustainable Buildings
• •Des 7 - Layout Design
• •Env 21 - Flood Protection
Any development will alter the way that water moves
across a site in times of rainfall or flooding. Flooding
can happen because of pluvial (overland) flow, fluvial
(river) flow or coastal flooding in certain conditions.
Culverted rivers, streams or historical springs can
also be present. Understanding the history of a site
and the risks and opportunities that water movement
provides should be appraised very early on in the
design process, in order to ensure that concept layout
plans presented are realistic.
Along with increased flood risk, development can also
increase pollution due to run-off over hard surfaces.
New development must address these issues through
the use of Sustainable Urban Drainage Systems
(SuDS) systems attenuate water, treat polluted water
and should be designed to maximise biodiversity
benefits. They should also be designed so they are an
attractive addition to the landscape. A range of SuDS
features are available to designers including porous
paving, green roofs, swales, bioretention trenches,
detention basins and ponds.
SuDS retention basin and swales, Kirkliston
In greenfield sites SuDS and flood attenuation
methods should be designed by early discussions
with water engineers and landscape architects within
the design team. The team should be aiming for a
‘Building with Nature’ - Excellent standard. Above
ground solutions should be provided on constrained
brownfield sites. Underground solutions are not
acceptable as they  leave a legacy of hidden structures
that have the potential to fail and should only be used
in exceptional circumstances
Permanent pond and swales with wetland planting at new
development in Kirkliston form an attractive part of the landscape
setting of the development and enhance biodiversity in the area.
173

Page 168

121
Sustainable Urban Drainage Systems
SuDS are a legal requirement under the Water
Environment (Controlled Activities) (Scotland)
Regulations 2011 when discharging surface water to
the water environment (except for a single dwelling
house or discharge to coastal waters).
All SuDS schemes should be designed to comply
with CIRIA C753 The SuDs Manual and should gain
agreement from Scottish Water.
SuDS schemes should be considered at the outset of
the project to ensure multiple benefits are realised.
This should be presented as a strategy with plans at
Planning Permission in Principle which should align
with the urban design and landscape framework.
If the SuDS system and the attenuation of flood
waters up to the 1:200 plus climate change is to
be combined, then the 1:30-1:200 can be designed
into the open space ( hard or soft) or parkland areas
provided the designs of the landscape/ public realm
are attractive and suitable maintenance arrangements
can be put in place.
SuDS schemes should be designed to maximise
the benefits we can secure from surface water
management which are:
• Control the quantity of runoff;
• Manage the quality of runoff and prevent pollution;
• Create and sustain better places for nature; and
• Create beautiful places for people.
Sustainable Urban Drainage Systems should also be
designed by engineers and landscape architects.
The designers should propose a system that:
• is beautiful;
• conveys water through the site above ground in
swales, biorentention trenches and filter trenches
as opposed to a piped system;
• integrates the attenuation areas into the landscape
design attractively;
SuDS Requirement Why SuDS required Checking Authority Adoption
Authority Design Manuals
Roads (eg infiltration,
ponds).
To reduce, treat and
attenuate, delay
surface water on the
roads reaching the
sewerage system.
Roads Dept, Local
Authority.
Roads Dept,
Local Authority.
SuDS for Roads;
Green Infrastructure -
Design & Placemaking;
Delivering Sustainable
Flood Risk
Management;
SuDS manual; and
SEPA guidance.
Treatment Ponds /
Basins.
To treat surface water
prior to discharge
into a watercourse,
culverted watercourse
or sewerage system.
Treatment Train—SEPA.
capacity—Council Flood
Prevention.
design—Scottish Water,
Council Planning.
Scottish Water.
Surface Water
Attenuation.
To attenuate surface
water flows up to the
200 year event.
Council Flood Prevention.
Council Planning.
Scottish Water.
Scottish Water;
or private
owner.
• can be maintained by grass cutting machines with a
max grass slopes 1:6;
• uses hard landscape areas in suitable locations;
• achieves water quality improvements through a
series of treatment and not end of pipe control
using the Simple Index Approach;
• enhances biodiversity;
• is overlooked by development as opposed to
located in a hidden space; and
• only requires to be fenced in exceptional
circumstances, a carefully designed landscape
should be able to reduce the risk to an acceptable
standard.
Technical guidance
174

Page 169

122
Surface Water Management Plans
A Surface Water Management Plan is a document
required by the Council to assess the flood risk
from surface water and ensure that runoff from
the development does not increase flood risk to
properties elsewhere. The Surface Water Management
Plan should identify a drainage strategy for events up
to a 1:200 yr flood event (a 0.5% Annual Exceedance
Probability [AEP]), with an allowance for climate
change. It should include details of surface water flow
paths, water quality treatment and discharge points
for the drainage system. For further information see
Planning application guidance on flooding.
Sutcliffe Park, Greenwich, London
The local community enjoy the use of this well-designed and
attractive parkland landscape which attenuates water in the event
of a serious flood.
Required attenuation volumes and surface water
flow paths should be considered at the feasibility
stage as they can affect the location and layout of
development. Surface water should be dealt with
by analysing the existing and proposed flow paths
together with potential ponding and runoff depths.
This should include runoff from outwith the site, from
unpaved areas within the site, and from roofs and
paved area in the events which exceed the capacity of
the system.
New buildings in the development must not be at risk
of flooding as a result of these flow paths and depths.
For example, where flow paths show that water will be
directed to a level access, or towards an underground
car park then possible preventative measures could
include:
SUDS feature for 1 in 30 year
event.
Area designed to attenuate water in a 1 in 200 year event. 
Suitable planting including trees can be incorporated.  Space
can be used for a range of functions such as kickabout areas. 
Gently sloping embankments help make the space easier to
access.
• Changing to the internal layout so that the door
is not directly in line with the flow around the
properties;
• Raising the floor level and providing a ramp.
Floor levels to be raised to a minimum of 200mm.
Ground levels either side of the ramp must fall
away to enable water to flow around the property.
In terraced situations a fall needs to be maintained
across each individual ramp, either from the centre
of a terrace to either side or from one end to the
other.
• Use other design concepts to divert the water
around the properties;
Technical guidance
175

Page 170

123
• The use of soft landscaping as a form of soakaway
and the reliance on linear slot drainage channels
will not be sufficient as a form of flood prevention
or diversion; and
• Care must also be taken that where walls are built
between gardens on the ‘high’ side of a slope that
gaps are left to avoid trapping water.
The development should provide attenuation of
surface water flows up to the 1:200yr plus climate
change event on site.
Attenuation should be above ground. Underground
attenuation is only acceptable in exceptional cases,
for example in constrained brown field sites in urban
areas. Flow to the attenuation areas should be
through linear features designed into the landscape/
streetscape of the site. The scheme should be
designed by a team that includes an engineer and
landscape architect.
Hard works details that form part of the public
realm should be designed in liaison with landscape
architects in the design team to provide a co-
ordinated response that is appropriate to the context
and is part of the overall design concept. In the public
realm careful consideration is required regarding
flows along the streets and the attenuation of the
overland flows. In certain situations flows can be
attenuated in hard landscaped areas provided they do
not negatively impact flooding of proposed or existing
properties.
On larger sites where banks are being used to create
the attenuation features, these should not be steeper
than 1:6 to allow for grass cutting. Steeper slopes
will require planting with suitable plants that do not
require cutting. It should be noted that arisings will
not be picked up and may contribute to a gradual
reduction in the amount of storage provided by a
feature.
The maximum discharge rate to the 200yr attenuation
should not exceed 4.5l/s/ha impermeable area or the
greenfield runoff fate, whichever is the lower.
SUDS—Upton, England
This SUDS feature is sensitively integrated into the development
SUDS—Malmo, Sweden
Sustainable drainage is fully integrated into the design and is a
major component of this recent development.
Image courtesy of Steve Tiesdell Legacy Collection
locked up culvert
Where possible, culverts should be opened up.
Technical guidance
176

Page 171

124
The River Environment
Flooding
A Flood Risk Assessment (FRA) is required under
planning policy and the Flood Risk Management
(Scotland) Act 2009 to demonstrate that a proposed
development is not at risk of flooding in a 1 in
200yr flood event (a 0.5% Annual Exceedance
Probability [AEP]) from a watercourse – this includes
watercourses that are open or culverted. The Scottish
Planning Policy (SPP) provides a risk framework to
determine the appropriate planning response for
three categories of flood risk. An allowance for climate
change should also be included. The assessment
should be supplied in a report format utilising
standard industrial software. If available, technical
advice can be obtained from the Flood Prevention
Unit.
Land raising to protect the development from river
flooding will not generally be acceptable within
functional flood plains.
Opportunities to remove existing adjacent properties
from the flood plain should be explored as part of any
scheme.
Culverts
In line with the SPP, culverted watercourses should
be opened up (de-culverted), where appropriate,
and a natural river environment incorporated into the
development design outline. Culverts and particular
screens on culvert inlets can cause flooding and are a
maintenance liability for the owner and the Council.
Also a natural river environment should be included in
development design when there is a straightened or
otherwise modified river channel on site, unless the
archaeological value of the straightened channel is
exceptionally high.
The flowchart adjacent shows requirements for
discharge points for a range of scenarios.
Surface Water
Treatment plus attention to meet 1:30 event
Drainage Treatment Train through SuDs in line with the
latest SuDs manual and SuDs for roads. Need approval
from SEPA that the treatment is sufficient.
Attenuation to meet 1:200 (1:1000 in certain
developments*) plus an allowance to meet climate
change
200 year + climate change maximum rate should not
exceed 4.5 I/s/ha of impermeable area or the 2 year
greenfield rate, whichever is lower. Full calculations must
be supplied. It is recognised that small, restricted sites
may require some relaxation in respect to allowable
discharge. A minimum practical discharge control should
be sized above 75mm diameter.
*As set out in Scottish Planning Policy 2014.
Watercourse or
“other waterbody”
privately or publicly
owned
Need approval from
the owner that
the discharge is
allowed.
Scottish Water
infrastructure
Need a letter
of Approval in
Principle for
discharge from
Scottish Water.
Discharge
Discharge Points for the drainage system
Inch Park
Removal of a straightened and modified channel along the
Braid Burn at Inch Park and re-meandering to create a natural
watercourse with riffles, pools and vegetation as part of flood
prevention works.
Technical guidance
177

Page 172

125
4.  Designing streets: Edinburgh Street Design Guidance
• are welcoming, inclusive and accessible to all;
• are easy to navigate;
• are attractive and distinctive;
• give priority to sustainable travel (walking, cycling and public transport);
• are safe and secure;
• make the most of our historic inheritance;
• respect key views, buildings and spaces that reflect the needs of local communities;
• are designed to deal with and respond to environmental factors such as sun, shade, wind, noise and air quality; and
• are resilient, cost-effective and have a positive impact on the environment over their life-cycle.
This Chapter presents the Council’s Street Design Guidance which was approved by the Transport and Environment
Committee on 25th August 2015 and the Planning Committee on 3rd October 2015. It is presented here in a new format
with some non-substantive text edits.
The Edinburgh Street Design Guidance sets out the Council’s requirements for street design seeking to provide
Edinburgh with world-class sustainable network of streets and places. This Guidance will enable anyone who designs,
plans, manages, maintains, alters or constructs streets to realise the Council’s aim to provide streets that:
178

Page 173

126
4.1   Introduction to the Edinburgh Street Design Guidance
Anyone who designs, plans, manages, alters or
construct streets in Edinburgh must refer to this
guidance (and its Detailed Design Manual) as a first
point of reference.
For any issues that are not covered in this Guidance,
Designing Streets should be the next point of
reference.
The Design Manual for Roads and Bridges (DMRB)
is not an appropriate design standard for most of
Edinburgh’s streets. Therefore it should not be used
unless specifically directed in this Guidance or for
any issues that are not covered within this Guidance.
Together with the earlier sections of the Edinburgh
Design Guidance, street design forms a critical
element, and shapes the very essence, of creating
better places.
High quality streets define Edinburgh. People visit the
city from all over the World to appreciate the special
qualities of the city. These owe much to the quality
and variety of the New Town and Old Town streets
along with the historic coastal and rural towns and
villages. We owe it to current and future citizens and
visitors to build on this great inheritance, improving
our existing streets and creating great new streets.
Street design, though, is not just about streets of
international significance; it is about every street in
the city. Every street that people live, shop and work
on and travel along can add to or detract from the
quality of city life. This guidance is about improving all
our streets for all users.
For too long we have put car based movement
ahead of the needs of pedestrians, cyclists and
public transport users when designing streets.
While most streets will accommodate car use, we
need to achieve a much better balance, one where
the street environment positively influences driver
behaviour, and where other street uses, and other
forms of travel, especially journeys by foot or by
bicycle, are prioritised over speed of movement by car.
Street design, therefore, has a significant influence
upon road user behaviour, as well as the quality of
Edinburgh’s streets.
To achieve quality streets, we need to fully embrace
relevant best practice from elsewhere, and tackle
perceived barriers to change. Building on the Scottish
Government Designing Streets policy, this Guidance
sets the design principles, the process and the
detailed technical guidance to achieve this in the
unique and diverse context of the city of Edinburgh.
Active ground floor uses provide an interesting and animated
streetscene – William Street
179

Page 174

127
What does the Edinburgh Design
Guidance do?
This street design guidance brings together previously
separate CEC guidance on street design to achieve
coherence and co-ordination across the city, with the
ultimate goal of providing the people of Edinburgh
with a world-class network of vibrant, safe, attractive,
effective and enjoyable streets.
It provides Edinburgh-specific guidance, fully
embracing the protocol and principles set out in the
Scottish Government’s ‘Designing Streets’ Policy.
It sets out the Council’s expectations for the design
of Edinburgh’s streets to support the Council’s wider
policies, in particular transport and planning policies. 
It aims to co-ordinate street design and to promote
collaborative working between different disciplines,
by considering the function of a street first as a place,
and then for movement.
Who is the Guidance for?
This Guidance sets out the Council’s design
expectations and aspirations for streets. It must
be used by anyone who designs, plans, manages,
maintains, alters or constructs streets within the
Council area.
What is the status of the Edinburgh
Street Design Guidance?
This Guidance will be the first point of reference
for all street design whether it is for renewals
schemes, improvements to existing streets or new
streets,(including urban paths), in Edinburgh. Such
projects include:
• Carriageway and footway maintenance and
renewals;
• New streets associated with development or
redevelopment;
• Alterations to existing streets including surfaced
paths; and
• Utility installations and reinstatements.
It will not apply to the design of unsurfaced rural
paths or tracks, or to the Scottish Government’s trunk
roads and motorways.
The Guidance will also apply to other Council services,
as well as Transport and Planning services, who
manage streets for various purposes. These include
The Council’s Housing, Parks and Greenspaces, Waste
and Fleet, Economic Development; Trading Standards
and Licensing for events, activities and permits for
street use e.g. for tables and chairs, market stalls
etc. Everyone who manages, maintains, alters or
reconstructs streets, including urban paths, will be
expected to comply with the Guidance in order to
realise the outcomes it sets out to achieve.
The Guidance will be a material consideration in
determining planning applications and appeals as well
as Road Construction Consent (RCC) processes.
A Detailed Design Manual, containing detailed and
technical information factsheets to implement the
Guidance, is available online.
The manual is intended to be a ‘live’ document and
will be updated to reflect best practice, policy and
legislative change Appendix B is an index for topics
covered by the Detailed Design Manual factsheets.
180

Page 175

128
How is the Edinburgh Street Design
Guidance structured and how do I use it?
The flow-chart overleaf reflects the structure of this
section of the Guidance, and demonstrates the basic
stages of the design process, to be followed by
anyone undertaking works on Edinburgh’s streets.
A Detailed Design Manual, (factsheets), containing
detailed and technical information factsheets to
implement the Guidance, will be available online in
early 2018.
The manual is intended to be a ‘live’ document and
will be updated to reflect best practice, policy and
legislative change.
How do I use the guidance?
Does the project/proposal create new streets and paths or involve changes to
existing streets
Does the project/proposal
support the vision,
objectives and commitments
in section 4.2?
1. Establish the level of design intervention (see
section 4.5)
2. Establish the street type using the street type map
(see section 4.4)
3. Will the street type change as a result of the
project?
4. Check the design principles for the street type and
level of intervention
5. Consult the detailed Design Manual Factsheet for
detailed design information
If the street type will change establish the new
street type based on its place/movement function
and the Edinburgh Street Framework in section 4.4
If the street is identified as a special street/place
check the special considerations in section 4.6
1. Develop a street pattern/structure (see section
4.3) ensuring compliance with chapters 1-3 of
this guidance; the Local Development Plan;
and the vision, objectives and commitments
set out in section 4.2.
2. Identify the type of street which will be created
based on the Edinburgh Street Framework (see
cection 4.4)
3. Apply the design principles for that street type
(see section 4.6)
4. Consult the detailed Design Manual Factsheets
for detailed design information.
Reconsider
or reframe the
project
Existing
Yes
No
New
181

Page 176

129
How does ESDG relate to other guidance?
This Street Design Guidance is part of a suite of
non-statutory guidance (see page 4) documents
that interpret Local Development Plan policies. It is
supplementary to the Local Development Plan and
Local Transport Strategy. It supersedes the following
previous City of Edinburgh Council Publications:
Standards for Streets (2006), Movement and
Development (2000) and the Edinburgh Standards for
Urban Design (2003).
Designing Streets Policy Statement for
Scotland
This Guidance aligns with Designing Streets which
will be the next point of reference for issues that are
not covered within this Guidance.
Risk and Liability
The design principles set out in this guidance
document follow the same principles established in
the Designing Streets policy document. This should
be consulted for further details of the risk and liability
considerations.
Additional information:
• Highway Risk and Liability Guide Second Edition
A practical guide to Appendix C of The UK Roads
Board Report ‘Well Maintained Highways: Code of
Practice for Highway Maintenance Management’,
ICE, 2009
• UK Roads Liaison Group Highway Risk and Liability
Use of Design Manual for Roads and
Bridges (DMRB)
The Design Manual for Roads and Bridges (DMRB)
provides standards, advice notes and other
documents relating to the design, assessment
and operation of trunk roads. The DMRB is not an
appropriate design standard for most of Edinburgh’s
streets, particularly for geometry and layout.
Therefore, in accordance with Designing Streets,
the DMRB standards should not be used, unless
specifically directed in the detail of this Guidance or
where this Guidance does not cover an issue.
182

Page 177

130
4.2   Guiding Principles
Ensure all works related to Edinburgh streets deliver
the Council’s objectives related to streets
Comply with the Council’s key commitments in street
design to deliver a world-class network of streets
and places
Vision and Objectives for streets
The Council’s vision is to transform the process of
street design to provide Edinburgh with a world-class
network of streets and places. We aim to enhance
the vibrancy of our streets, support sustainable
movement, make the most of our historic inheritance
and optimise the use of limited budgets.
This Guidance is based on the following objectives for
streets which align with the key qualities set out in
Designing Streets. We aim to provide streets that:
• re welcoming, inclusive and accessible to all;
• re easy to navigate;
• are attractive and distinctive;
• give priority to sustainable travel (walking, cycling
and public transport);
• are safe and secure;
• •make the most of our historic inheritance;
• are designed to deal with and respond to
environmental factors such as sun, shade, wind,
noise and air quality.
• respect key views, buildings and spaces reflect the
needs of local communities; and
• re resilient, cost-effective and have a positive
impact on the environment over their life-cycle.
Commitments
Street Design will:
• follow a design process that starts by considering
the street as a place for people and recognising that
streets have an important non- transport role.
• provide integrated design solutions which reflect
the local character of the area.
• always prioritise improving conditions for
pedestrians, especially for those with mobility
impairments or other disabilities, for cyclists and for
public transport users.
• use signs, markings and street furniture only where
necessary, and in a balanced way.
How will our streets change as a result of
this guidance?
The main differences that this design guidance
will make on our streets are summarised below. In
addition, detailed Factsheets in Detailed Design
Manual discuss each of these proposed changes and
associated issues in more detail.
Streets as places
This guidance is intended to bring about a shift in
the emphasis of street design across the city from
a movement dominated approach, to one which
starts by considering streets as places, in so doing
reinforcing and improving the quality of Edinburgh’s
streets. Designers should have a clear understanding
of the function of a particular street and propose
improvements that will reflect the role of the street,
whether it is primarily a retail (high) street, a low
density residential street, a place for social and
cultural activity, a busy bus or general traffic route.
They will use design to influence road user behaviour,
helping reduce vehicle speeds and thus improving
safety, particularly for pedestrians and cyclists.
See factsheet:
P1. Street as a Place
P2. Promoting Pedestrian Movement and Activity
G6. Speed Reduction and Traffic Management
C1. Designing for Cycling 
183

Page 178

131
Road Geometry
• Using narrower vehicle lanes, consistent with
promoting slower traffic speeds which give more
space to pedestrians and cyclists, whilst keeping
enough width for buses to operate efficiently where
appropriate.
See Factsheet:
P2. Promoting Pedestrian Movement and Activity
C1. Designing for Cycling
G2. Carriageway Widths (under production)
Road Crossings for pedestrians and cyclists
• Providing new crossings on desire lines wherever
possible, including where this brings the crossing
very close to a side road junction.
See Factsheet:
G4. Crossings
G5. Crossings at or Near Junctions
P2. Promoting Pedestrian Movement and Activity
C1. Designing for Cycling 
Cycling and cycleways
• Increasing the priority given to cyclists in street
design.
• Introducing guidance covering segregated on-
street cycleways, including dealing effectively with
junctions and bus stops
See Factsheet:
C1.  Designing for Cycling 
C2. Cycle Lanes
C3. Segregated Cycle Tracks - Soft Segregation (under
production)
C4. Segregated Cycle Tracks - Hard Segregation
Junctions
• ‘Tight’ corner radii will be encouraged, slowing
down turning vehicles and making side roads easier
to cross.
• Wider use of raised road junctions without specific
vehicle priority to help reduce vehicle speeds and to
give pedestrians more priority.
• Introduction of ‘continuous pavement’ side road
crossings in streets busy with pedestrians, giving
greater priority to people travelling on foot.
• Pedestrian phases and advanced cycle stop lines at
all signalled junctions.
See Factsheet:
G4. Crossings
G5. Crossings at or Near Junctions
G6. Speed Reduction and Traffic Management
G7. Priority Junctions
G8. Junctions (under production)
M4. Tactile Paving
P2.  Promoting Pedestrian Movement and Activity
P8. Pedestrian Streets (under production)
F3. Signage
184

Page 179

132
Footways
• Altering the design of driveway crossings of
pavements (“crossovers”) to prioritise a level
surface for walking and wheelchairs above a
gradual gradient for cars. Ensuring crossfalls on all
footways are comfortable for people with reduced
mobility.
• Using the guardrail assessment protocol adopted in
2012 as a basis for considering this design feature,
with a presumption against new railings and in
favour of removing existing.
• Providing tactile paving and (where carriageways
are not raised) dropped kerbs at all controlled
and uncontrolled crossing points, including those
at junctions, and prevention of parking at these
crossing points.
• Wider footways in places which are busy with
pedestrians, and clear walking zones along them.
See Factsheet:
P3. Footways
P4. Vehicle Crossovers on Footways
P5. Pedestrian Guardrail
M4. Tactile Paving
De-cluttering
• Minimising signing, lining, bins and other street
furniture to create an uncluttered space for both
movement and place functions.
• Generally not reinstating the centrelines on the
20mph network, other than on strategic routes.
(A trial conducted in London between 2013 and
2014 concluded that there was a statistically
significant reduction in vehicle speeds. There
will be immediate and longer term maintenance
cost savings as a result of not reinstating the
centrelines).
See Factsheet:
F3. Signage
G3. Omitting Centrelines
G6. Speed Reduction and Traffic Management
P7. Minimising Street Clutter 
Flood management and Sustainable Urban
Drainage systems (SuDs)
• Promoting and clarifying the requirements for this
new approach to drainage which seeks to ‘design
out’ flood risk through attenuation as well as
providing water quality treatment both in terms of
new streets and retrofitting in existing streets.
• Ensure the systems maximise the potential for
improvements to landscape and biodiversity
e.g. the use of ‘rain gardens’ with trees and soft
landscaping.
See Factsheet:
W1. Sustainable Urban Drainage Systems (SuDS)
(under production)
W2. Drainage (under production)
F5. Street Trees (under production)
Street trees and soft landscaping
• Introducing street trees and soft landscaping to
conserve and enhance townscape character; to
use as traffic calming measure and to encourage
walking and cycling.
See Factsheet:
P2. Promoting Pedestrian Movement and Activity
C1. Designing for Cycling 
F5. Street Trees (under production)
G6. Speed Reduction and Traffic ManagementPoundbury, Dorset - Source: WSP
	
185

Page 180

133
4.3   Street Pattern/Structure
When creating new street patterns in Edinburgh,
designers should draw on:
• Edinburgh’s vision, objectives and commitments
set out in this Guidance;
• Designing Streets’ key considerations for
designing new street patterns (p15-31); and
• Edinburgh’s recognisable street patterns and
distinctive urban structure.
These will also apply to making amendments to
existing streets.
In summary the key requirements include:
• establishing connected streets – cul de sacs should
be avoided especially for walking and cycling;
• creating an urban form that establishes suitable
grids and patterns and creates relationships
between street widths and building heights
• ensuring neighbourhoods are walkable;
• prioritising pedestrians, cycling and public
transport;
• design solutions drawing on typologies common
to Edinburgh and respond to the character and
features of the area (refer to Conservation Area
Character Appraisals and Edinburgh Design
Guidance, chapter 1); and
• considering the environmental quality of the street.
The Edinburgh Context
Edinburgh’s city centre has a powerful and distinctive
character created by its topography, geological history
and the unique form of its historic environment,
consisting of the Old and New Towns separated by
what are now Princes Street and its gardens. This
character makes a contribution to the city’s quality
of life, to its status as a World Heritage city and to its
position as a major visitor destination. What makes
Edinburgh special is detailed in the Edinburgh section
of this guidance.
Referencing Existing Street Styles
Edinburgh has a legacy of original street layouts,
fabrics, materials and furniture. Locally quarried
sandstone, Caithness paving, original whinstone
kerbs, granite setts, horonized paving, original
cast iron street lamps and street features such as
mounting blocks, lighting plinths and coal chutes have
been retained in many parts of the city.
These features form part of the overall values that
underpin World Heritage status and create the
essential character of the city’s conservation areas. It
is important that changes to streets aim to preserve
and enhance this historic fabric.
There is range of street character in Edinburgh
where the scale, ratios and patterns, materials
of streets vary. The street patterns of Medieval,
Georgian, Victorian and Edwardian streets, and of
some (but not all) between and post war Edinburgh
streets demonstrate good townscape qualities
showing coherent relationships between building,
footway and road. Generally, designs for changes to
existing streets or for new streets should reinforce
recognisable street patterns and styles already in
place locally. However 20th century car-based street
patterns with layouts impermeable to pedestrians,
cyclists and public transport should be adapted or
replaced wherever opportunities arise.
Edinburgh already has good practice examples that
feature as Designing Streets case studies. These
include:
• Wauchope Square (City of Edinburgh)
• Gracemount (City of Edinburgh)
• Greendykes North (City of Edinburgh)
186

Page 181

134
Gracemount City of Edinburgh 21st
Century Homes
In Gracemount, streets are designed to provide a
pedestrian friendly, low traffic speed area which
works as a coherent public space. There are uniform
levels with no high kerbs and different zones are
distinguished by different surface finishes.
This approach allows the street to become a more
sociable space. To address concerns about the use of
shared surfaces by blind and partially sighted people,
a separate walkway is provided which is defined by a
tactile strip rather than a raised kerb. All homes have
a private or semi private outdoor space – a private
garden, private balcony or secure communal rear
garden.
Public open space is provided by retaining an
important existing walkway through the site and three
informal squares, located at road junctions, provide
small scale greenspace with seating.
	
Parking courts softened with planting
Case study
187

Page 182

135
4.4   Edinburgh Street Framework
When creating new street types, use the ‘Edinburgh
Street Framework to determine the relative place and
movement function of a street.
The place function of a street must be considered
first.
For existing streets, the Edinburgh Street Types Map
should be used to identify the street’s category.
Once the street category is established, this should
then inform the specific Design Principles to be
adhered to (section 4.6).
The dual place and movement roles of streets are the
key considerations when designing streets.
All projects, including road and pavement renewals,
have the potential to incorporate design changes. So
designers need to understand the role of a street to
in-turn propose improvements that reflect its specific
role.
Within the Edinburgh Street Framework there are
seven place categories, ranging from rural roads with
no frontages, through to retail or high streets. There
are also six movement categories to differentiate
the significance of movement, ranging from strategic
routes, through to footpath/cycleways, and also
special streets.
As a place, a street is a destination in its own right.
People using streets as places will live on a street,
or make use of buildings or other facilities that are
located on it. People using streets as places are
almost always on foot.
Movement is essentially travel by any mode. Within
the Edinburgh Streets Framework, the movement
significance of a street is primarily determined by the
function of the street for medium and long distance
movements, particularly by public transport.
Streets with similar movement functions can have
very different place functions. Perhaps the best
examples in Edinburgh are the main roads into the
city centre from its edges. These are very significant
for movement throughout their lengths, whilst their
place function varies dramatically, ranging from outer
suburban low density housing to busy high streets.
Edinburgh Street Framework
Type of Place
Rural
roads/No
frontage
Industrial
Employment
Low Density
Residential
Med Density
Residential
High Density
Residential
Service Sector
Employment
Retail/
High
Streets
Significance
of Movement
Strategic
Secondary
Local
Other streets
and paths
Footpath/
cycleways (shared by pedestrians and cyclists)
Footpaths (pedestrians only)
Special
streets and
places
Royal Mile, Princes Street, George Street (with squares), Grassmarket, The Shore,
Queensferry High Street, Old Towns closes and stairs
Source: Designing Streets, page 9
188

Page 183

136
Application of the above framework on our existing
streets has resulted in the Edinburgh Street Types
map, representing Edinburgh’s existing streets based
on their current place
and movement status.
Those who are dealing
with Edinburgh’s
existing streets can
simply locate the
street(s) in question
on the map to refer to
the relevant Design
Principles (presented in
section 4.6).
The street framework
should be used by
developers creating new
streets, considering
both place and
movement functions in
categorising streets. See
overleaf for detail.
Key
Retail / High Streets
Local
Secondary
Strategic
Service Sector Employment Streets
Local
Secondary
Strategic
High Density Residential Streets
Local
Secondary
Strategic
Medium Density Residential Streets
Local
Secondary
Strategic
Low Density Residential Streets
Local
Secondary
Strategic
Industrial Employment Streets
Local
Secondary
Strategic
Rural Roads / No Frontage Streets
Local
Secondary
Strategic
Shared Cycle / Foot Paths
Footpaths and Stairs
Old Town Closes and Stairs
Special Streets
Trunk Roads
ATAP Quiet Route
Streets Fronting Greenspace / Parks
Edinburgh Street Types Map
189

Page 184

137
1.  What type of a place to create?
Put simply, the significance of place is derived by
the land uses and frontages associated with specific
streets. Streets with lots of people on them and many
pedestrian interactions have a high place significance
e.g. streets with shop frontages and offices. In
contrast, streets with limited building frontages or
pedestrian interactions have a low place significance
e.g. industrial estates and rural roads.
Retail/High Streets have an important and
valued role within the whole city, local district or
neighbourhood. They typically comprise a group of
shops with frontage at the ground floor level and
are mixed with other land uses between or above
them such as non-retail employment (e.g. offices),
restaurants, hotels, tenement flats, or other types
of private residence. This type of place also covers
smaller numbers of shops providing an important
community function in local centres.
Service sector employment streets are typically
fronted by offices, schools, hospitals, universities/
colleges and other non-industrial and non residential
land uses that tend to generate substantial
movements at peak times.
Industrial employment streets include activities
related to industrial manufacturing, distribution and
sale of industrial goods etc.
High density residential streets include traditional
multi-storey tenements and newer high density
housing developments consisting of modern
apartments (these may depart from traditional street
patterns). They are sometimes mixed with retail and/
or non-retail employment.
Medium density residential streets, include terraces,
colonies, 2 to 3 storey villas or new apartments.
Low density residential streets include 1-2 storey and
less densely spaced family dwellings such as semi-
detached houses or bungalows. Houses usually have
their own private frontage/ gardens and off-street car
parking.
Rural roads and streets with no frontage generally
run through a rural or other green setting, with only
isolated or intermittent built frontage.
The majority of new streets will be high, medium or
low density residential.
20 mph Streets
Edinburgh is the first 20 mph city in Scotland with
30mph and 40mph speed limits only maintained for a
limited arterial network. Therefore the default design
speed for new streets is 20 mph. Exceptions will be
considered for new rural streets with no-frontage,
for those serving and fronting low- medium density
industrial land uses and for those strategic and
secondary streets with a frequent bus service.
2.  How significant should movement be?
The movement significance of a street should be
based on its’ role in connecting major destinations
and on the importance of the street for motorised
(public and private transport) traffic.
Strategic streets accommodate the highest levels of
movement by a range of modes of transport including
out-of-city movements. These include A roads and
other main streets, such as Leith Walk, Morningside
Road and the Western Approach Road.
Secondary streets provide connections between
different parts of the city with moderate to high levels
of movement, usually including bus routes. Examples
include Captains Road, Bonnington Road, or Drum
Brae.
Local streets mainly provide local access, for example
for residents and employees to and from their
houses and places of work. These streets will not
have a significant through traffic function. They can
vary substantially in width depending on when they
were first built. They do not have a significant public
transport role.
The majority of new streets are likely to fall into the
‘Local streets’ category.
Paths are type of street that will usually excludes
any form of motorised traffic. The level to which
pedestrians and cyclists are separated from each
another will vary.
How to apply Edinburgh Street Framework guidance
190

Page 185

138
Where streets have more than one land-use, for
example with both retail and residential functions,
the predominant ground level use should be seen as
the main influence on the balance between place and
movement.
Some streets will have a consistent design along
their length. However in many cases, a streets’ place
function changes as it passes through the city (eg
from retail/shopping to residential to office based
employment). At transitions between two place
types, there should not be a sharp change in design
approach. The designer should take a pragmatic
approach to the design so that it makes sense to
the user and avoids apparently illogical or jarring
changes.
Sometimes one side of a street will have a different
place function from the other. In this case, the street
type with the higher place status should normally
apply on both sides, although some flexibility can
be applied. For example, on a street with shops on
one side and a local park boundary on the other, the
highest priority (shopping) implies a need for paving
slabs on the footways on both sides; in practice,
blacktop could be used on the park side, if there is
low pedestrian demand. There may also be cases
where special design consideration may apply.
Whatever the composition of the street, its design
should be coherent and respond to the local context.
In some cases, complete transformation of a street
may be desirable or required by a design brief,
meaning that the existing movement and place
characteristics of a street should be altered by
the design. This approach is most likely to apply
when redevelopment projects, area wide traffic
management schemes or urban design improvements
are proposed. In some cases, the transformation of a
street may take several years and go through different
phases.
Street segmentation: Where street type changes take a pragmatic approach to changing design approach,
changes in design should always make sense on the ground.
Street type 1
Street type 2
Street type 3
Street type 1
Street type 1
Street type 2
Street type 3
Designing for multi-functional streets
191

Page 186

139
4.5   Levels of Design intervention
All work undertaken on Edinburgh’s streets should
move towards the vision and objectives for streets
set out in this document. This guidance must be
applied across the design spectrum, from the
completion of routine maintenance and basic repairs
to construction of brand new streets. To this end,
depending on the type and extent of works proposed,
there are three levels of design intervention:
• Basic, which is concerned with tidying up and
decluttering streets, and improving key
• Features of streets so they are accessible for all
and support street uses and activities
• Standard, which includes basic interventions but
may involve more significant street redesign
• Innovative, which goes beyond the standard
approach to consider complete re-design
These three levels of intervention are summarised in
the adjoining table and described and illustrated in
more detail overleaf.
The design principles sheets give more information on
what each level of intervention should involve on the
various different street types.
For example, designers should make ‘basic’ design
changes as part of a small scale renewals project, but
‘standard’ changes as part of a larger carriageway or
footway renewal scheme.
New streets should always be designed to innovative
or standard design principles.
Design principles/
intervention
Actions Required Type and extent of work
Basic Tidy up
Get rid of unnecessary
street furniture that is easy
to remove, combine or
relocate (bins, signs, seats)
Declutter
Do not retain street
furniture and road sign/
marking unless there is a
clear case for retention
Small scale maintenance and renewals projects that
are based on periodic inspections and/or reports
and requests from third parties, e.g. single pothole
repairs, isolated footway repairs <25m in length,
single (pairs) of tactile or drop kerb installations, new
single signs, new crossovers for single buildings etc. 
Also applies to other services that use, maintain and
manage streets including utility providers.
Improve
Improve standards of
streets with smaller budget
and limited specs so that
they are accessible for all
and support street uses/
activities
Small scale capital (carriageway and footway)
renewal schemes and other small scale capital
schemes including road safety projects, new
crossings, traffic calming schemes incorporating
physical measures, junction refurbishments, bus
stops including build outs, and road cycle schemes.
Standard Rethink and redesign
Apply basic design
principles but also aim for
significant street re-design
and roadspace reallocation.
Medium to large scale capital (carriageway and footway)
renewal schemes and other medium to large scale capital
schemes such as large scale traffic management, bus
priority and cycle priority schemes.
Innovative Consider innovative
approaches when creating
new streets or completely
reconstructing existing
ones
This level should be considered for street/area based public realm
or economic development projects. Previous examples include
High Street, Leith Walk and Grassmarket where the whole street
layout has been/is being reconfigured from building to building. 
Also should be considered when creating new streets associated
with developments.
192

Page 187

140
“Basic” Design Principles / Requirements focus on -
making Edinburgh’s streets accessible especially for
vulnerable street users (e.g. mobility impaired, blind
and partially sighted, elderly or young, people with
cognitive difficulties etc) and supporting sustainable
forms of travel.
Achieving this requires tidying up, decluttering and
improving basic street layout, materials and furniture.
Any small scale works /projects on streets undertaken
by the Council or third parties will fulfil the basic
design principles / requirements that are specified in
the design principles sheet for each street type.
Basic: illustrative example of the same street tidied up and
decluttered
Standard: illustrative example of the same street reconstructed as
an ATAP Quiet Route
Innovative: illustrative example of the same street reconstructed
as shared space
“Innovative” Design Principles / Requirements
include concepts that may be new or experimental
(at least in the UK context), or suitable only in special
circumstances.
Any corridor or area based public realm, transport
or economic development projects by the Council or
third parties will fulfil both the basic and standard
design principles and should consider innovative
design principles.
Any new development should start by considering
innovative principles with an understanding that
certain elements won’t be applicable in all scenarios.
“Standard” Design Principles / Requirements
supplement these basic treatments and focus on
establishing a much higher standard of street. The
majority of these requirements already feature in
some of our streets, but the aim is to make sure all
parts of Edinburgh offer such streets to our residents
and visitors.
Any Medium to large scale works /projects on streets
by the Council or third parties will fulfil the basic and
standard design principles / requirements that are
specified in the design principles sheet for each street
type.
Intervention levels
193

Page 188

141
4.6   Design principles
Design Principles sheets provide a high-level design
brief for any works undertaken on a particular street,
depending on its category.
Key design principles to be adhered to include:
• Ensuring accessibility by street users of all levels
of mobility;
• Prioritising walking, cycling and public transport;
and
• Creating solutions that respond to the character,
features and materials of an area.
To inform design considerations, ‘Design Principles’
summary sheets have been developed which identify
key design parameters for each particular street type,
depending upon the level of intervention proposed
(and agreed with the Council).
The key points set out in each Design Principles sheet
should be the basis for design, though designs should
always look to incorporate local context and priorities.
The Design Principle sheets also guide the user
towards associated Detailed Design Manual
‘Factsheets’ for detailed design issues.
Some of Edinburgh’s streets also require special
design consideration and design principles depending
on whether they are in the World Heritage Site and/
or a conservation area; or simply include significant
squares, public buildings and/or attractions. (see
overleaf).
Design Principles: RETAIL HIGH STREETS STREETS (STRATEGIC, SECONDARY AND LOCAL)
Retail/High Streets have an important and valued role to the whole city, district or neighbourhood. They typically comprise of shops along a street frontage at the ground floor level,
often mixed with other land uses between or above them such as non-retail employment (e.g. offices), restaurants, offices, hotels, tenement flats or other types of private residence.
There is significant amount of pedestrian activity associated with the movement of people along these streets. There are also high levels of kerbside activity generated by parking,
loading and public transport. They can be centres of civic pride with important buildings, squares and spaces. These functions should be understood and incorporated in the design.
Street design must cater for retail, leisure and social needs as well as the needs of people walking, cycling, public transport. Private motor traffic should generally be accommodated
but not prioritised. Pedestrians should have priority across side streets. Cyclists should be separated as far as possible from traffic.
STREET LAYOUT Factsheet reference
BASIC
Minimum width of footway - strategic and secondary streets: general min 2.5m, desirable min 3m or wider. Local streets: general min 2m, desirable min 2.5m
or wider. Maximise clear “walking zone” (absolute min:1.5m - only allowed in short sections, bus stops 1m). P3, F1
Minimise corner radii (desirable max 3m for majority street types, 1m for local streets). G6, G1, P2
Provide pedestrian crossing points (controlled or uncontrolled crossings) every 50-100m, preferably on desire lines, e.g. at/near side roads or entrances to
significant buildings. Consider raised crossings and signalised/zebra crossings at strategic points. Locate them at or near junctions to respect pedestrian
desire lines. Avoid staggered crossings.
G4, G5, P2, M4
Street type
Summary statement
covering this type of
street
Design principles
Reference to relevant
factsheet section
194

Page 189

142
Some specific local design factors may need to be
addressed as part of the design process. Examples of
these Special Design Considerations include:
• World Heritage Site, conservation areas and
listed buildings, Natural Heritage and biodiversity
designations areas that are otherwise visually
distinct or historically important
• areas that may require increased social and
pedestrian space such as squares and significant
streets, street junctions and intersection; and
• areas outside buildings such as schools, pubs, local
shops or at bus stops or rail stations
• streets that front onto water (coastal or river) and
important greenspace (parks and gardens)
• footpaths
• foot/cycle paths
• Active Travel Action Plan (ATAP) Quiet Routes
These design factors are important in delivering
Edinburgh’s vision and objectives and should apply
across the standard street types.
Some of the key principles related to these streets
and places are outlined overleaf in the following
principles sheets.
Special Streets and Places
There will be a number of exceptions and unique
locations which require special treatment; examples
include:
• Royal Mile
• Princes Street
• George Street (with squares)
• Grassmarket
• he Shore
• Queensferry High Street
• Melville Drive
• Old Town’s closes and stairs
The overall vision and objectives for street and design
set out in this guidance are relevant for these special
streets and places. They should be used as a basis for
any design proposals, in the first instance, along with
any more specific local objectives.
When considering significant or full reconstruction
of these streets, their unique nature means that it is
important that creativity and innovation is not stifled
by an overly generic approach to design. It is therefore
recommended that objectives, suitably prioritised,
should form the basis of a collaborative/ corporate
based design approach.
For maintenance and more limited reconstruction, the
most appropriate principles sheets (eg primary and
secondary retail) as well as any specific design codes
already in place, should be used to inform the design.
Special Design Considerations
195

Page 190

143
Design Principles: RETAIL HIGH STREETS STREETS (STRATEGIC, SECONDARY AND LOCAL)
Retail/High Streets have an important and valued role to the whole city, district or neighbourhood. They typically comprise of shops along a street frontage at the ground floor level,
often mixed with other land uses between or above them such as non-retail employment (e.g. offices), restaurants, offices, hotels, tenement flats or other types of private residence.
There is significant amount of pedestrian activity associated with the movement of people along these streets. There are also high levels of kerbside activity generated by parking,
loading and public transport. They can be centres of civic pride with important buildings, squares and spaces. These functions should be understood and incorporated in the design.
Street design must cater for retail, leisure and social needs as well as the needs of people walking, cycling, public transport. Private motor traffic should generally be accommodated but
not prioritised. Pedestrians should have priority across side streets. Cyclists should be separated as far as possible from traffic.
STREET LAYOUT Factsheet reference
BASIC
Minimum width of footway - strategic and secondary streets: general min 2.5m, desirable min 3m or wider. Local streets: general min 2m, desirable min 2.5m or wider.
Maximise clear “walking zone” (absolute min:1.5m - only allowed in short sections, bus stops 1m). P3, F1
Minimise corner radii (desirable max 3m for majority street types, 1m for local streets). G6, G1, P2
Provide pedestrian crossing points (controlled or uncontrolled crossings) every 50-100m, preferably on desire lines, e.g. at/near side roads or entrances to significant
buildings. Consider raised crossings and signalised/zebra crossings at strategic points. Locate them at or near junctions to respect pedestrian desire lines. Avoid
staggered crossings.
G4, G5, P2, M4
Provide pedestrian phases on all signalised junction arms and consider X (all green) crossing. G4, G8
Review existing Traffic Regulation Orders (TRO’s). Make all crossing points suitable for wheelchairs and protected from parking/loading. G4, M4
Introduce waiting restrictions to protect all corners and, if required, the opposite kerbside of T-junctions, from parking and loading. P2, G9
No new vehicular footway crossovers to be introduced on strategic and secondary streets. Remove obviously redundant footway crossovers. At new and existing
vehicle crossovers retain an evenly graded walking zone of at least 1.5m wide, preferably 2m or more. P4
If the street forms part of the ATAP Quiet Routes Network (GIS) or the network crosses the street, provide or at least future proof specific cycle provision of a suitable
standard - consult active travel team. C1, C2, C3, C4
Provide Advanced Stop Lines at all signalised junctions. G8
Provide cycle parking for visitors and commuters. C7, C6
Reduce the amount of kerbside devoted to parking and loading to support cycle/bus facilities and increases in pedestrian space. C1, G9, PT1
Consider providing bus boarders where minimum clear footway width of 1m can’t be obtained (consider implications for cyclists) otherwise provide bus stop clearway
of min 25m at every stop. PT2, P3,F1
STANDARD
Design speed for streets is 20mph, including bus routes. G6
Install continuous footways at uncontrolled sideroad junctions (depending on vehicle flow). G7, P2, P3
Consider raised junctions incorporating full carriageway width of main road at key junctions. G8, G4
Consider shared space at key junctions/locations, public transport interchanges etc. P8, G6
Consider provision of mandatory or segregated cycle lanes on strategic and secondary streets especially where traffic volumes are high. Connect them to ATAP Quiet
Routes Network (GIS). C1, C2, C3, C4
Consider bus lanes with parking/loading restrictions on strategic and secondary streets or other priority measures. PT3, G9
Consider retrofit SUDS e.g. bioretention, swales etc. W1
INNOVATIVE
Consider full shared space as part of a comprehensive approach to wider traffic management, but only with measures to avoid random/footway parking. P8, G6
Incorporate SUDS features (swales, ponds, basins, bioretention, etc). W1
FABRIC/MATERIALS Factsheet reference
BASIC
Localised repairs to footway and carriageway (including surface treated cycle and bus lanes) must be in original material. Consider overlay or surface dressing to
improve skid resistance (only where required), enhance appearance or extend life. M1
Footways in paving slabs (PCC or natural stone). M1, M3
Contrasting grey tactile paving/ cycle warning paving. M4
Consistent use of materials (no breaks for driveways etc unless historic materials. In this situation use flat-topped setts) M1, M6
If streets are settled then setts should be replaced with flat-topped at crossing points for wheelchairs, prams etc. use. M1, M3, M6
Provide completely smooth walking zone surface (min 1.5m wide) suitable for wheelchairs, prams etc. M1, M3, P3
Use Pre-Cast Concrete (PCC) kerbing and edging outside Conservation Areas, unless whinstone is currently used. Standard kerb height 75-100mm. Consider retention
of natural materials. M1, M3
Carriageway HRA Asphalt or SMA. Review antiskid locations/requirements. M5
Cycle lanes and bus lanes - red chipped HRA surfacing (applied red surface on cycle lanes at safety-critical locations) C2, PT3
Bus stops kerb upstand 70-100mm. PT2
Minimise road markings. Generally, omit centreline on 20 mph secondary and local streets that have only one general traffic lane in either direction. P7, G3
STANDARD
Consider natural materials for kerbs. M1
Consider recessed utility covers in consultation with the utility suppliers. F1
Consider soft landscaping and street trees to conserve and enhance townscape character and for SUDS - discuss with Planning / Forestry and Natural Heritage as early
as possible. F5, W1
Consider retrofit SUDS materials e.g. permeable paving, etc. W1
Consider different/high quality materials to enhance streets as places. M1,P1
FURNITURE/FEATURES Factsheet reference
BASIC
Consolidate street poles and signs etc to declutter the street. Follow de-cluttering Assessment process. P7, F1
Presumption against guardrail - Apply Guardrail Assessment Process for removal, retention and installation of new. P5
Clear walking zone (absolute min 1.5 m, bus stops 1m if unavoidable) from obstructions: relocate street furniture & features outside walking zone close to the kerb or
buildings. P3, P7
Locate domestic bins & recycling units off street & public bins on footways, outside the walking zone. F4, P7, P3
Furniture set back from kerb to be 200-300mm where 450mm set back doesn’t allow 2m clear walking zone. F1, P3
Provide frequent seating and litter bins (contact Waste and Cleansing teams). F2, F4
Visitor and commuter cycle parking will be Sheffield stands or cycle hoops. Communal residents’ cycle parking will be lockable compound/container. C7, C6
Provide bus shelter, preferably with seating, at all stops (check current furniture contract/shelter requirements/notice boards). Contact public transport team. PT2
Locate signage on walls/ boundaries and other street furniture. Utilise existing poles to avoid erecting new ones. F3, P3
Utility chambers to be replaced if worn and if redundant, to be removed. Do not place new ones in walking zone. P3, P7
Protect existing trees, and replace dead trees - discuss with Forestry Service, Parks, Green Space and Cemeteries as early as possible. F5
STANDARD
Consider provision for city dressing/ events infrastructure. Also consider CCTV requirements. P3
Provide street lighting, aluminium columns or preferably wall mounted. F6
Assess and provide community and retail information; and wayfinding and directional signage. Locate on walls/boundaries or existing street furniture. F3
Street furniture to form a family of materials and styles. F1
INNOVATIVE
Minimise street furniture, signage and road markings, to minimise visual impact and obstruction of pedestrian space. P7,F1,P2
Use street furniture and planting as part of speed control strategy and to encourage activity on street. G6,F1,F5
196

Page 191

144
Design Principles: SERVICE SECTOR EMPLOYMENT STREETS (STRATEGIC, SECONDARY AND LOCAL)
Service Sector Employment Streets are typically fronted by offices, hospitals, universities/colleges, schools and other non-industrial and non-residential land uses that tend to generate
substantial movements at peak times. Street design should enhance the place function of the street whilst catering for travel to and from the businesses etc. on the street, prioritising
walking, cycling and public transport. Pedestrians should have priority across side streets. Cyclists should be separated as far as possible from traffic.
STREET LAYOUT Factsheet reference
BASIC
Minimum width of footway - strategic and secondary streets: general min 2.5m, desirable min 3m or wider. Local streets: general min 2m, desirable min 2.5m or wider.
Maximise clear “walking zone” (absolute min:1.5m - only allowed in short sections, bus stops: 1m). P3, F1
Minimise corner radii (desirable max 3m for majority street types, 1m for local streets). G6, G1, P2
Provide pedestrian crossing points (controlled or uncontrolled crossings) every 50-100m, preferably on desire lines, e.g. to serve major building entrances.
Consider raised crossings and signalised/zebra crossings at strategic points. Locate them at or near junctions to respect pedestrian desire lines. Avoid staggered
crossings. G4, G5, P2, M4
Provide pedestrian phases on all signalised junction arms and consider X (all green) crossing. G4, G8
Review existing Traffic Regulation Orders (TRO’s). Make all crossing points suitable for wheelchairs and protected from parking/loading. G4, M4
Introduce waiting restrictions to protect all corners and, if required, the opposite kerbside of T-junctions, from parking and loading. P2, G9
No new vehicular footway crossovers to be introduced on strategic and secondary streets. Remove obviously redundant footway crossovers. At new and existing vehicle
crossovers retain an evenly graded walking zone of at least 1.5m wide. P4
If the street forms part of the ATAP Quiet Routes Network (GIS) or the network crosses the street, provide or at least future proof specific cycle provision of a suitable
standard - consult cycle team. C1, C2, C3, C4
Provide Advanced Stop Lines at all signalised junctions. G8
Provide cycle parking for visitors, and commuters if off-street provision is likely to be difficult for building occupiers. C7, C6
Reduce the amount of kerbside devoted to parking and loading to support cycle/bus facilities and increases in pedestrian space. C1, G9, PT1
Consider providing bus boarders where minimum clear footway width of 1m can’t be obtained (consider implications for cyclists) otherwise provide bus stop clearway of
min 25m at every stop. PT2, P3,F1
STANDARD
Design speed is 20mph, including bus routes. G6
Install continuous footways at uncontrolled sideroad junctions (depending on vehicle flow). G7, P2, P3
Consider raised junctions incorporating full carriageway width of main road at key junctions. G8, G4
Consider shared space at key junctions/locations, public transport interchanges etc. P8, G6
Consider provision of mandatory or segregated cycle lanes on strategic and secondary streets especially where traffic volumes/speeds are high. Connect them to ATAP
Quiet Routes Network (GIS). C1, C2, C3, C4
Consider bus lanes with parking/loading restrictions on strategic and secondary streets or other priority measures. PT3, G9
Consider retrofit SUDS e.g. bioretention, swales W1
INNOVATIVE
Consider full shared space as part of a comprehensive approach to wider traffic management, but only with means to avoid random/footway parking. P8, G6
Incorporate SUDS features (swales, ponds, basins, bioretention, etc). W1
FABRIC/MATERIALS Factsheet reference
BASIC
Localised repairs to footway and carriageway (including surface treated cycle and bus lanes) must be in original material. Consider overlay or surface dressing to
improve skid resistance (only where required), enhance appearance or extend life. M1
Consider using paving slabs on strategic or secondary streets, and retaining slabs if already in place on other streets. Slabs are most likely to be appropriate in higher
use areas – e.g. where there is a concentration of large employers or at frontages to shops and public buildings. Elsewhere HRA. M1, M3
Contrasting grey tactile paving/ cycle warning paving. M4
Consistent use of materials (no breaks for driveways etc unless historic materials. In this situation use flat-topped setts). M1, M6
If streets are settled then setts should be replaced with flat-topped at crossing points for wheelchairs, prams etc. use. M1, M3, M6
Provide completely smooth walking zone surface (min 1.5m wide) suitable for wheelchairs, prams etc. M1, M3, P3
Use Pre-Cast Concrete (PCC) kerbing and edging outside Conservation Areas, unless whinstone is currently used. Standard kerb height 75-100mm. Consider retention of
natural materials. M1, M3
Carriageway HRA Asphalt or SMA. Review antiskid locations/requirements. M5
Cycle lanes and bus lanes - red chipped HRA surfacing (applied red surface on cycle lanes at safety-critical locations). M5
Bus stops kerb upstand 70-100mm. PT2
Minimise road markings. Generally, omit centreline on 20 mph secondary and local streets that have only one general traffic lane in either direction. P7, G3
STANDARD
Consider natural materials for kerbs. M1
Consider recessed utility covers in consultation with the utility suppliers. F1
Consider soft landscaping and street trees to conserve and enhance townscape character and for SUDS - discuss with Planning / Parks as early as possible. F5, W1
Consider retrofit SUDS materials e.g. permeable paving, etc. W1
FURNITURE/FEATURES Factsheet reference
BASIC
Consolidate street poles and signs etc to declutter the street. Follow De-cluttering Assessment process. P7, F1
Presumption against guardrail - Apply Guardrail Assessment Process for removal, retention and installation of new. P5
Clear walking zone (absolute min 1.5m, bus stops 1m) from obstructions: relocate street furniture & features outside walking zone close to the kerb or buildings P3, P7
Locate domestic bins & recycling units off street or on carriageway (consider implications for cycling) & public bins on footways, outside the walking zone F4, P7, P3
Furniture set back from kerb to be 200-300mm where 450mm set back doesn’t allow 1.5m clear walking zone. F1, P3
Provide frequent seating and litter bins (contact Waste and Cleansing teams). F2, F4
Visitor and commuter cycle parking will be Edinburgh stands or cycle hoops. C7, C6
Provide bus shelter, preferably with seating, at all stops (check current furniture contract/shelter requirements/notice boards): contact Public Transport Team. PT2
Locate signage on walls/ boundaries and other street furniture. Utilise existing poles to avoid erecting new ones. F3, P3
Utility chambers to be replaced if worn and if redundant, to be removed. New ones are not to be placed in walking zone. P3, P7
Protect existing trees, and replace dead trees - discuss with Forestry Service, Parks, Green Space and Cemeteries as early as possible. F5
STANDARD
Consider provision for city dressing/ events infrastructure. Also consider CCTV requirements. P3
Provide street lighting, aluminium columns or preferably wall mounted. F6
Assess and provide community and retail information; and wayfinding and directional signage located on walls/boundaries or existing street furniture. F3
Street furniture to form a family of materials and styles. F1
INNOVATIVE
Minimise street furniture, signage and road markings, to minimise visual impact and obstruction of pedestrian space. P7,F1,P2
Use street furniture and planting as part of speed control strategy and to encourage activity on street. G6,F1,F5
197

Page 192

145
Design Principles: HIGH DENSITY RESIDENTIAL STREETS (STRATEGIC, SECONDARY AND LOCAL)
High-density residential streets typically consist of traditional multi-storey tenements, 3 or more storey terraces, ‘colony’ housing as well as newer high-density apartments often with
unconventional street layouts and building accesses that may depart from traditional street patterns. They are sometimes mixed with retail and/or non-retail employment.
Design for high density residential streets should emphasise social spaces, the pedestrian environment and safe cycling. Street furniture such as seating, bins, cycle and motorcycle
parking, and bus shelters will be highly relevant.
STREET LAYOUT Factsheet reference
BASIC
Minimum width of footway - strategic and secondary streets: general min 2.5m, desirable min 3m or wider. Local streets: general min 2m, desirable min 2.5m or wider.
Maximise clear “walking zone” (absolute min:1.5m - only allowed in short sections, bus stops 1m) P3, F1
Minimise corner radii (desirable max 3m for majority street types, 1m for local streets) G6, G1, P2
Provide pedestrian crossing points (uncontrolled or controlled crossings) every 50-100m. Consider raised crossings and signalised/zebra crossings at strategic points.
Locate them at or near junctions to respect pedestrian desire lines. Avoid staggered crossings. G4, G5, P2, M4
Provide pedestrian phases on all signalised junction arms. G4, G8
Review existing Traffic Regulation Orders (TRO’s). Make all crossing points suitable for wheelchairs and protected from parking/loading. G4, M4
Introduce waiting restrictions to protect all corners and, if required, the opposite kerbside of T-junctions, from parking and loading. P2, G9
No new vehicular footway crossovers to serve existing developments to be introduced on strategic and secondary streets. Remove obviously redundant footway
crossovers. At new and existing vehicle crossovers retain an evenly graded walking zone of at least 1.5m wide. P4
If the street forms part of the ATAP Quiet Routes Network (GIS) or the network crosses the street, provide or at least future proof specific cycle provision of a suitable
standard - consult active travel team. C1, C2, C3, C4
Provide Advanced Stop Lines at all signalised junctions. G8
Provide cycle parking for residents and visitors. C7, C6
Reduce the amount of kerbside devoted to parking and loading to support cycle/bus facilities on strategic and secondary streets. C1, G9, PT1
Consider providing bus boarders where minimum footway clear width of 1m can’t be obtained (consider implications for cyclists) otherwise provide bus stop clearway
of min 25m at every stop on strategic and secondary streets. PT2, P3, F1
STANDARD
Design speed for secondary and local streets is 20mph, including bus routes. Consider 20mph for strategic streets. G6
Consider installing continuous footways at uncontrolled side road junctions. G7, P2, P3
Consider raised junctions incorporating full carriageway width of main road at key junctions. G8, G4
Consider shared space at squares, key junctions/locations, public transport interchanges etc. P8, G6
Consider provision of mandatory or segregated cycle lanes on strategic and secondary streets especially where traffic volumes/speeds are high. Provide if on ATAP
Quiet Routes Network (GIS), and consider connection to this network. C1, C2, C3, C4
Consider bus lanes with parking/loading restrictions or other priority measures on strategic and secondary streets (consult Public Transport team). PT3, G9
Consider retrofit SUDS e.g. bioretention, swales, etc. W1
INNOVATIVE
Consider full shared space as part of a comprehensive approach to wider traffic management, with means to avoid random/footway parking. P8, G6
Incorporate SUDS features (swales, ponds, basins, filter strips, bioretention, etc) W1
FABRIC/MATERIALS Factsheet reference
BASIC
Localised repairs to footway and carriageway (including surface treated cycle and bus lanes) must be in original material. Consider overlay or surface dressing to
improve skid resistance (only where required), enhance appearance or extend life. M1
Use paving slabs on strategic or secondary streets. Consider retaining if already in place on other streets. Also utilise in higher use locations (e.g. squares, frontages to
shops and public buildings). Elsewhere HRA. M1, M3
Contrasting grey tactile paving/ cycle warning paving. M4
Consistent use of materials (no breaks for driveways etc unless historic materials. In this situation use flat-topped setts). M1, M6
If streets are settled then setts should be replaced with flat-topped at crossing points for wheelchairs, prams etc. use. M1, M3, M6
Provide completely smooth walking zone surface (min 1.5m wide) suitable for wheelchairs, prams etc. M1, M3, P3
Use Pre-Cast Concrete (PCC) kerbing and edging outside Conservation Areas, unless whinstone is currently used. Standard kerb height 70-100mm. Presumption in
favour of retaining natural materials. M1, M3
Carriageway HRA Asphalt or SMA. Review antiskid locations/requirements. M5
Cycle lanes and bus lanes - red chipped HRA surfacing (applied red surface on cycle lanes at safety-critical locations). C2, PT3
Bus stops kerb upstand 70-100mm. PT2
Minimise road markings. Generally, omit centreline on 20 mph secondary and local streets that have only one general traffic lane in either direction. P7, G3
STANDARD
Consider natural materials for kerbs. M1
Consider recessed utility covers in consultation with the utility suppliers. F1
Consider soft landscaping and street trees to conserve and enhance townscape character and for SUDS - discuss with Planning / Forestry and Natural Heritage as early
as possible. F5, W1
Consider retrofit SUDS materials e.g. permeable paving, etc. W1
FURNITURE/FEATURES Factsheet reference
BASIC
Consolidate street poles and signs etc to declutter the street. Follow De-Cluttering Assessment process. P7, F1
Presumption against guardrail - Apply Guardrail Assessment Process for removal, retention and installation of new. P5
Clear walking zone (absolute min 1.5 m, bus stops 1m if unavoidable) from obstructions - relocate street furniture and features outside walking zone closer to the kerb
or buildings. P3, P7
Locate domestic bins and recycling units off street or on carriageway (consider implications for cycling) and public bins on footways (outside the walking zone). F4, P7, P3
Furniture set back from kerb to be 200-300mm where 450mm set back doesn’t allow 1.5m clear walking zone. F1, P3
Provide seating and litter bins (contact Waste and Cleansing teams). F2, F4
Visitor cycle parking to be Edinburgh stands or cycle hoops. Communal residents’ cycle parking preferred to be lockable compound/container. C7, C6
Provide bus shelter, preferably with seating, at all bus stops (check current furniture contract, shelter requirements, notice boards etc) - contact public transport team. PT2
Locate signage on walls/ boundaries and other street furniture. Utilise existing poles to avoid erecting new ones. F3, P3
Utility chambers to be replaced if worn and if redundant, to be removed. Do not place new ones in walking zone. P3, P7
Protect existing trees, and replace dead trees - discuss with Forestry Service, Parks, Green Space & Cemeteries as early as possible. F5
STANDARD
Minimise street furniture, signage and road markings, to minimise visual impact and obstruction of pedestrian space. P7,F1,P2
Consider provision for city dressing/ events infrastructure on strategic and secondary streets. Also consider CCTV requirements. P3
Provide street lighting, aluminium columns or preferably wall mounted. F6
Assess and provide community information; and wayfinding and directional signage. Locate them on walls/boundaries and other street furniture. F3
Street furniture to form a family of materials and styles. F1
INNOVATIVE
Use street furniture and planting as part of speed control strategy and to encourage activity on street. G6,F1,F5
198

Page 193

146
Design Principles: MEDIUM DENSITY RESIDENTIAL STREETS (STRATEGIC, SECONDARY AND LOCAL)
Medium density residential streets, typically consist of 2-3 storey terraced housing, villas, apartments or closely spaced semi-detached housing.
STREET LAYOUT Factsheet reference
BASIC
Minimum width of footway - strategic streets: general min 2.5m, desirable min 3m or wider. Secondary streets: general min: 2.5m, desirable min 2.5m. Local streets:
general min 2m, desirable min 2.5m or wider.
Maximise clear “walking zone” (absolute min:1.5m - only allowed in short sections, bus stops 1m).
P3, F1
Minimise corner radii (desirable max 3m for majority of street types, 1m for local streets). G6, G1, P2
Provide pedestrian crossing points (generally uncontrolled) every 50-100m. Consider raised crossings and signalised/zebra crossings at strategic points. Locate them at
or near junctions to respect pedestrian desire lines. Avoid staggered crossings. G4, G5, P2, M4
Provide pedestrian phases on all signalised junction arms. G4, G8
Review existing Traffic Regulation Orders (TRO’s). Make all crossing points suitable for wheelchairs and protected from parking/loading. G4, M4
Introduce waiting restrictions to protect all corners and, if required, the opposite kerbside of T-junctions, from parking and loading. P2, G9
Remove obviously redundant footway crossovers. At new and existing vehicle crossovers retain an evenly graded walking zone of at least 1.5m wide. P4
If the street forms part of an ATAP Quiet Routes Network (GIS) or the network crosses the street, provide or at least future proof specific cycle provision of a suitable
standard - consult active travel team. C1, C2, C3, C4
Provide Advanced Stop Lines at all signalised junctions. G8
Consider providing cycle parking for residents and visitors. C7, C6
Reduce the amount of kerbside devoted to parking and loading to support cycle/bus facilities on strategic and secondary streets. C1, G9, PT1
Consider providing bus boarders where minimum clear footway width of 1m can’t be obtained (consider implications for cyclists) otherwise provide bus stop clearway
of min 25m at every stop on strategic and secondary streets. PT2, P3,F1
STANDARD
Design speed for secondary and local streets is 20mph, including bus routes. G6
Consider installing continuous footways at uncontrolled sideroad junctions. G7, P2, P3
Consider raised junctions incorporating full carriageway width of main road at key junctions. G8, G4
Consider shared space at squares, key junctions/locations, public transport interchanges etc. P8, G6
Consider provision of mandatory or segregated cycle lanes on strategic and secondary streets especially where traffic volumes/speeds are high. Provide if on ATAP
Quiet Routes Network (GIS), and consider connection to this network. C1, C2, C3, C4
Consider locating bus lanes with parking/loading restrictions or other priority measures, on strategic and secondary streets (consult Public Transport team). PT3, G9
Consider retrofit SUDS e.g. bioretention, swales, etc. W1
INNOVATIVE
Consider full shared space as part of a comprehensive approach to wider traffic management, with measures to avoid random/footway parking. P8, G6
Incorporate SUDS features (swales, ponds, basins, filter strips, bioretention, etc). W1
FABRIC/MATERIALS Factsheet reference
BASIC
Localised repairs to footway and carriageway (including surface treated cycle and bus lanes) must be in original material. Consider overlay or surface dressing to
improve skid resistance (if required), enhance appearance or extend life. M1
Footways HRA surfacing. PCC paving at special or higher use location e.g. frontages to shops, public buildings, etc. M1, M3
Contrasting grey tactile paving/ cycle warning paving. M4
Consistent use of materials (no breaks for driveways etc unless historic materials. In this situation use flat-topped setts) M1, M6
If streets are settled then setts should be replaced with flat-topped at crossing points for wheelchairs, prams etc. use. M1, M3, M6, P4
Provide completely smooth walking zone surface (min 1.5m wide) suitable for wheelchairs, prams etc. M1, M3, P3
Use Pre-Cast Concrete (PCC) kerbing and edging outside Conservation Areas, unless whinstone is currently used. Standard kerb height 70-100mm. Presumption in
favour of retaining natural materials. M1, M3
Carriageway HRA Asphalt or SMA. Review antiskid locations/requirements. M5
Cycle lanes and bus lanes - red chipped HRA surfacing (applied red surface on cycle lanes at safety-critical locations). C2, PT3
Bus stops kerb upstand 70-100mm. PT2
Minimise road markings. Generally, omit centreline on 20 mph secondary and local streets that have only one general traffic lane in each direction. P7, G3
STANDARD
Consider natural materials for kerbs. M1
Consider recessed utility covers in consultation with the utility suppliers. F1
Consider soft landscaping and street trees to conserve and enhance townscape character and for SUDS - discuss with Planning / Forestry and Natural Heritage as early
as possible. F5, W1
Consider retrofit SUDS materials e.g. permeable paving, etc. W1
FURNITURE/FEATURES Factsheet reference
BASIC
Consolidate street poles and signs etc to declutter the street. Follow De-cluttering Assessment process. P7, F1
Presumption against guardrail - Apply Guardrail Assessment Process for removal, retention and installation of new. P5
Clear walking zone (absolute min 1.5 m, 1m at bus stops if unavoidable) from obstructions - relocate street furniture and features outside walking zone closer to the
kerb or buildings. P3, P7
Locate domestic bins and recycling units off street or on carriageway (consider implications for cycling) and public bins on footways (outside the walking zone). F4, P7, P3
Furniture set back from kerb to be 200-300mm where 450mm set back doesn’t allow adequate clear walking zone (1.5m local streets, 2.0m secondary/strategic). F1, P3
Consider providing seating and litter bins (contact Waste and Cleansing teams). F2, F4
Visitor cycle parking to be Edinburgh stands or cycle hoops. Communal residents’ cycle parking preferred to be lockable compound/container. C7, C6
Provide bus shelter, preferably with seating, at all bus stops (check current furniture contract, shelter requirements, notice boards etc) - contact public transport team. PT2
Locate signage on walls/ boundaries and other street furniture. Utilise existing poles to avoid erecting new ones. F3, P3
Utility chambers to be replaced if worn and if redundant, to be removed. Avoid placing new ones in walking zone. P3, P7
Protect existing trees, and replace dead trees - discuss with Forestry Service, Parks, Green Space & Cemeteries as early as possible. F5
STANDARD
Use street furniture and planting as part of speed control strategy and to encourage activity on street. G6, F1, F5
Consider provision for city dressing/ events infrastructure on strategic streets. Also consider CCTV requirements. P3
Provide street lighting, aluminium columns or preferably wall mounted. F6
Assess and, where appropriate, provide community information; and wayfinding and directional signage. Locate them on walls/ boundaries and other street furniture. F3
Street furniture to form a family of materials and styles. F1
INNOVATIVE
Minimise street furniture, signage and road markings, to minimise visual impact and obstruction of pedestrian space. P7, F1, P2
199

Page 194

147
Design Principles: LOW DENSITY RESIDENTIAL STREETS (STRATEGIC, SECONDARY AND LOCAL)
Low-density residential streets include 1-2 storey and less densely spaced family dwellings such as semi-detached houses or bungalows. Houses usually have their own private
frontage/gardens and off-street car parking.
Design for strategic streets should generally prioritise public transport then cycling and walking. Similarly, secondary streets, while local streets will prioritise pedestrian movements and
play on streets. Trees have an important role in helping provide sense of shelter and sense of enclosure on these streets.
STREET LAYOUT Factsheet reference
BASIC
Minimum width of footway – strategic streets: general min 2m, desirable min 2.5m or wider. Secondary streets and local streets: general min 2m, desirable min 2m or
wider.
Maximise clear “walking zone” (absolute min:1.5m - only allowed in short sections, bus stops 1m).
P3, F1
Minimise corner radii (desirable max 3m for majority street types, 1m for local streets). G6, G1, P2
Provide pedestrian crossing points (generally uncontrolled) every 100-200m. Consider raised crossings and signalised/zebra crossings at strategic points. Locate them
at or near junctions to respect pedestrian desire lines. Avoid staggered crossings. G4, G5, P2, M4
Provide pedestrian phases on all signalised junction arms. G4, G8
Review existing Traffic Regulation Orders (TRO’s). Make all crossing points suitable for wheelchairs and protected from parking/loading. G4, M4
Introduce waiting restrictions to protect all corners and, if required, the opposite kerbside of T-junctions, from parking and loading. P2, G9
Remove obviously redundant footway crossovers. At new and existing vehicle crossovers retain an evenly graded walking zone of at least 1.5m wide. P4
If the street forms part of an ATAP Quiet Routes Network (GIS) or the network crosses the street, provide or at least future proof specific cycle provision of a suitable
standard - consult active travel team. C1, C2, C3, C4
Provide Advanced Stop Lines at all signalised junctions. G8
Provide cycle parking for visitors at strategic locations such as shops, libraries, etc. C7, C6
Reduce the amount of kerbside devoted to parking and loading to support cycle/bus facilities on strategic and secondary streets. C1, G9, PT1
Consider providing bus boarders where minimum footway width of 1m can’t be obtained (consider implications for cyclists) otherwise provide bus stop clearway of min
25m at every stop on strategic and secondary streets. PT2, P3,F1
STANDARD
Design speed for most secondary streets (except if ≥ 12 buses per hour 2 way) and local streets is 20mph. G6
Consider raised junctions incorporating full carriageway width of main road at key junctions. G8, G4
Consider full length shared space, if problems of footway parking but only if parking is fully controlled. P8, G6
Consider provision of mandatory or segregated cycle lanes on strategic and secondary streets especially where traffic volumes/speeds are high. Provide if on ATAP
Quiet Routes Network (GIS), and consider connections to this network. C1, C2, C3, C4
Consider bus lanes with parking/loading restrictions or other priority measures on strategic and secondary streets. PT3, G9
Consider retrofit SUDS e.g. bioretention, swales etc. W1
INNOVATIVE
Consider full shared space as part of a comprehensive approach to wider traffic management, but only if parking is fully controlled. P8, G6
Incorporate SUDS features (swales, ponds, basins, filter strips, bioretention, etc). W1
FABRIC/MATERIALS Factsheet reference
BASIC
Localised repairs to footway and carriage way (including surface treated cycle and bus lanes) must be in original material. Consider overlay or surface dressing to
improve skid resistance (only where required), enhance appearance or extend life. M1
Footways generally in HRA. Consider PCC paving at strategic locations or higher use locations e.g. shops, public building etc. M1, M3
Contrasting grey tactile paving/ cycle warning paving. M4
Consistent use of materials (no breaks for driveways etc unless historic materials. In this situation use flat-topped setts) M1, M6
If streets are settled then setts should be replaced with flat-topped at crossing points for wheelchairs, prams etc. use. M1, M3, M6, P4
Provide completely smooth walking zone surface (min 1.5m wide) suitable for wheelchairs, prams etc. M1, M3, P3
Use Pre-Cast Concrete (PCC) kerbing and edging outside Conservation Areas, unless whinstone is currently used.
Standard kerb height 700-100mm. Consider retention of natural materials. M1, M3
Carriageway HRA Asphalt or SMA. Review antiskid locations/requirements. M5
Cycle lanes and bus lanes - red chipped HRA surfacing (applied red surface on cycle lanes at safety-critical locations). C2, PT3
Bus stops kerb upstand 70-100mm. PT2
Minimise road markings. Generally, omit centreline on 20 mph secondary and local streets that have only one general traffic lane in either direction. P7, G3
STANDARD
Consider natural materials for kerbs. M1
Consider soft landscaping and street trees to conserve and enhance townscape character and for SUDS - discuss with Planning / Forestry and Natural Heritage as early
as possible. F5, W1
Consider retrofit SUDS materials e.g. permeable paving etc. W1
FURNITURE/FEATURES Factsheet reference
BASIC
Consolidate street poles and signs etc to declutter the street. Follow De-cluttering Assessment process. P7, F1
Presumption against guardrail - Apply Guardrail Assessment Process for removal, retention and installation of new. P5
Clear walking zone (absolute min 1.5 m, 1m at bus stops if unavoidable) from obstructions - relocate street furniture and features outside walking zone closer to the
kerb or buildings. P3, P7
Locate domestic bins and recycling units off street or on carriageway (consider implications for cycling) and public bins on footways (outside the walking zone). F4, P7, P3
Furniture set back from kerb to be 200-300mm where 450mm set back doesn’t allow 1.5m clear walking zone. F1, P3
Consider providing seating and litter bins (contact Waste and Cleansing teams) on strategic and secondary streets. F2, F4
Visitor cycle parking to be Edinburgh stands or cycle hoops. C7, C6
Provide bus shelter, preferably with seating, at all bus stops (check current furniture contract, shelter requirements, notice boards etc) - contact Public Transport team. PT2
Locate signage on walls/ boundaries and other street furniture. Utilise existing poles to avoid erecting new ones. F3, P3
Utility chambers to be replaced if worn and if redundant, to be removed. New ones should not be placed in walking zone. P3, P7
Protect existing trees, and replace dead trees - discuss with Forestry Service, Parks, Green Space and Cemeteries as early as possible. F5
STANDARD
Provide street lighting, aluminium columns or preferably wall mounted. F6
Consider CCTV requirements P3
Consider providing community information; and wayfinding and directional signage. F3
Street furniture to form a family of materials and styles. F1
INNOVATIVE
Minimise street furniture, signage and road markings, to minimise visual impact and obstruction of pedestrian space. P7,F1,P2
Use street furniture and planting as part of speed control strategy and to encourage activity on street. G6,F1,F5
200

Page 195

148
Design Principles: INDUSTRIAL EMPLOYMENT STREETS (STRATEGIC, SECONDARY AND LOCAL)
Industrial employment streets include activities related to industrial manufacturing, distribution and sale of industrial goods etc. They often have very little frontage and are in
industrial estates.
STREET LAYOUT Factsheet reference
BASIC
Minimum width of footway - strategic and secondary streets: general min 2m, desirable min 3m or wider. Local streets: general min 2m, desirable min 2.5m or
wider.
Maximise clear “walking zone” (absolute min:1.5m - only allowed in short sections, bus stops 1m).
P3, F1
Corner radii- where possible, reduce to maximum 6m, consistent with the following:
Vehicle tracking to ensure appropriate radii for required HGV manoeuvres.
Use of full width of minor roads to make turns is acceptable. Cars and light vans should be able to make turns at junctions with secondary roads without
impinging onto opposing traffic. All vehicles should be able to make turns at junctions onto strategic roads without impinging onto opposing traffic.
G6, G1, P2
Provide pedestrian crossing points (controlled or uncontrolled crossings) at least every 100 m on strategic, 50 m on secondary and local streets. Locate them at
or near junctions to respect pedestrian desire lines. Avoid staggered crossings. G4, G5, P2, M4
Provide pedestrian phases on all signalised junction arms and consider X (all green) crossing at junctions with heavy pedestrian use. G4, G8
Review existing Traffic Regulation Orders (TRO’s). Make all crossing points suitable for wheelchairs and protected from parking/loading. G4, M4
Introduce waiting restrictions to protect all corners and, if required, the opposite kerbside of T-junctions, from parking and loading. P2, G9
Remove obviously redundant footway crossovers. At new and existing vehicle crossovers retain an evenly graded walking zone of at least 1.5m wide. P4
If the street forms part of an ATAP Quiet Routes Network (GIS) or the network crosses the street, provide or at least future proof specific cycle provision of a
suitable standard - consult Active Travel Team. C1, C2, C3, C4
Provide Advanced Stop Lines at all signalised junctions. G8
Provide cycle parking for visitors and (in situations where not available off street) commuters. C7, C6
Consider providing bus boarders where minimum clear footway width of 1m can’t be obtained at bus stops (consider implications for cyclists) otherwise
provide bus stop clearway of min 25m at every stop. PT2, P3,F1
STANDARD
Design speed for secondary and local streets is 20mph, including bus routes. G6
On strategic and secondary streets with significant bus frequency, consider locating bus lanes where queuing occurs. PT3
Reduce the amount of kerbside devoted to parking and loading to support cycle/bus facilities on strategic and secondary streets. C1, G9, PT1
Consider provision of mandatory or segregated cycle lanes on strategic and secondary streets especially where traffic volumes/speeds are high. Provide if on
ATAP Quiet Routes Network (GIS), and consider connection to network.
Consider retrofit SUDS e.g. bioretention, swales, etc.
INNOVATIVE
Consider shared space at key locations, PT interchanges etc. P8
Incorporate SUDS features (swales, ponds, basins, filter strips, bioretention, etc). W1
FABRIC/MATERIALS Factsheet reference
BASIC
Localised repairs to footway and carriageway (including surface treated cycle and bus lanes) must be in original material. Consider overlay or surface dressing
to improve skid resistance if required, enhance appearance or extend life. M1
Footways HRA surfacing. PCC paving at special or higher use location e.g. frontages to shops, public buildings, etc. M1, M3
Contrasting grey tactile paving/ cycle warning paving. M4
Use Pre-Cast Concrete (PCC) kerbing and edging outside Conservation Areas, unless whinstone is currently used. Standard kerb height 70-100mm. M1, M3
Carriageway HRA Asphalt or SMA. Review antiskid locations/requirements. M5
Cycle lanes and bus lanes - red chipped HRA surfacing (applied red surface on cycle lanes at safety-critical locations). C2, PT3
Minimise road markings. No centrelines on local streets with design speed of 20mph. G3
STANDARD
Provide completely smooth walking zone surface (min 1.5m wide) suitable for wheelchairs, prams etc. M1, M3, P3
Consider natural materials for kerbs. M1
Incorporate SUDS measures. W1
Bus stops kerb upstand 70-100mm. PT2
Consider retrofit SUDS materials e.g. permeable paving etc. W1
FURNITURE/FEATURES Factsheet reference
BASIC
Consolidate street poles and signs etc to declutter the street. Follow De-Cluttering Assessment process. P7
Presumption against guardrail - Apply Guardrail Assessment Process for removal, retention and installation of new. P5
Protect existing trees, and replace dead trees - discuss with Parks as early as possible. F5
Clear walking zone (absolute min 1.5 m, 1m at bus stops if unavoidable) from obstructions - relocate street furniture and features outside walking zone closer
to the kerb or buildings. P3, P7
Locate domestic bins and recycling units off street or on carriageway (consider implications for cycling) and public bins on footways (outside the walking zone). F4, P7, P3
Furniture set back from kerb to be 200-300mm where 450mm set back doesn’t allow adequate clear walking zone (1.5m local streets, 2.0m secondary/
strategic). F1, P3
Consider providing seating and litter bins (contact Waste and Cleansing teams). F2, F4
Visitor cycle parking to be Edinburgh stands or cycle hoops. C7, C6
Provide bus shelter, preferably with seating, at all bus stops (check current furniture contract, shelter requirements, notice boards etc) - contact public
transport team. PT2
Locate signage on walls/ boundaries and other street furniture. Utilise existing poles to avoid erecting new ones. F3, P3
Utility chambers to be replaced if worn and if redundant, to be removed. Avoid placing new ones in walking zone. P3, P7
Protect existing trees, and replace dead trees - discuss with Forestry Service, Parks, Green Space & Cemeteries as early as possible. F5
STANDARD
Assess and provide community information; and wayfinding and directional signage. Locate them on walls/ boundaries and other street furniture. F3
Utility requirements (chambers replaced and removed if redundant) P7
Furniture set back from kerb to be 200-300mm where 450mm set back doesn’t allow 1.5m clear walking zone. F1, P3
INNOVATIVE
Minimise street furniture, signage and road markings, to minimise visual impact and obstruction of pedestrian space. P7, F1, P2
Use street furniture and planting as part of speed control strategy and to encourage activity on street. G6, F1, F
201

Page 196

149
The Council must protect these areas, and there are
extra rules to control building work. Conservation
area management plans include more information
to help protect
conservation areas.
The management
plans are for the
Leith and Inverleith
conservation areas.
Listed Buildings protect both the internal as well
as the external features of the building. This will
include features that interface with streets, such
as outbuildings, boundary walls and features such
as lighting, gateways and materials such as paving
and settled surfaces. Listed buildings are afforded
statutory protection which means that changes that
take place that could affect its character as a building
of architectural or historic interest are controlled.
Key Principles
• Reinforce the character of the Place
• Seek to use traditional materials
These principles will be achieved by applying the
following supplementary objectives:
• Innovative and creative solutions (artistic
interventions)
• Create flexible spaces that allow a range of
activities (future proof)
• Maintain the design philosophy of original scheme
(especially with materials and details)
• Include facilities for events and city dressing etc.
Edinburgh has a considerable number of areas that
are specially protected. Edinburgh’s network of streets
pass through many of these protected areas which
means that the choice of layout, the materials used
and street furniture / features; such as street lighting;
have to take into account the character and potential
impact of any changes being made.
World Heritage Site (WHS) status is protected
through the combination of its conservation area
designation, the considerable number of listed
buildings and natural environment designations.
Conservation areas have special architectural or
historic interest. There are 49 in Edinburgh and details
can be found in each report (link to CACA’s).
Design Principles:
World Heritage site, Conservation Areas,
Listed buildings, Natural Heritage and
biodiversity designations
202

Page 197

150
Designed Landscapes, Tree Preservation Orders
(TPO’s) SSSI’s LNR’s etc. protect special landscapes
and areas of biodiversity. Changes to the landscape
as well as the timing of work can be harmful to some
habitats and species.
All of these specially protected places are mapped on
the Council’s GIS system and many are shown on the
maps in the Local Development Plan for Edinburgh.
The following Principles will apply:
• Identify constraints or requirements that may apply
if you are within or adjacent to a designated place
or feature (protect, retain, preserve and enhance
etc.)
• retain and protect historic/natural features, with
reference to:
- natural stone paving or setts, kerbs and
channels, mounting stones or lighting plinths,
coal chutes, lighting columns, boundary walls,
entrance stones, railings and original light
fittings etc (link to paving the way and settled
streets report at EWH)
- areas of natural habitat, landscape and trees
vulnerable features/ species
• Preserve and enhance the character of the place,
with reference to:
- the setting to buildings, landscape, topography
- use natural materials in the WHS and key streets
in Conservation Areas
- consider reproduction lighting (in the WHS or
key locations) or conservation lighting
- repair original lighting
- repair settled streets or add new settled streets
and features
- replace railings/gates and improve boundary
treatments
- historic information and interpretation/
wayfinding
• Respect and contribute to local character - layout
and overall design arrangement and detailing with
reference to:
- proportion materials
- recognisable street pattern, building, footway,
road
• Careful consideration will need to be given to
introducing new trees in the World Heritage Site
and Conservation Areas, including the use of
temporary planting measures.
See section 1.1 and City of Edinburgh Council’s
Guidance on Listed Buildings and Conservation
Areas for further information
Design Principles
203

Page 198

151
Squares and significant streets, key
nodes/intersections and spaces around
public buildings and attractions
These special locations tend to have 24 hour activity.
Designs should take account of requirements for
flexibility of use and night time lighting etc. These
areas will have an overriding place function. They
will provide a non-transport function, such as sitting
or relaxing, although will sometimes feature priority
routes for through movements by foot or bike.
Edinburgh has few urban squares and its public
spaces are either gardens or significant streets.
Squares and significant streets have an important
role in the city for events and activities and have
pedestrian priority. It is important that squares are
well connected with routes and have ground floor
activity to maintain surveillance at all times of the day.
Key nodes/intersections often feature key buildings
and are where people naturally meet and gather
together. They can have a greater amount of space
than in the adjoining street network. They will provide
interesting spaces including seating, vegetation, art
and / or enhanced footway fabric treatments or detail.
Public Buildings and attractions will have high
numbers of pedestrians. Often distinctive buildings,
they will benefit from additional space around their
entrances and facilities such as cycle parking and high
quality/hard wearing footway fabric.
Design Principles:
Squares and significant streets, key
nodes/intersections and spaces around
public buildings and attractions
204

Page 199

152
Footpaths between places, such as neighbourhood
facilities and local transport services, should be safe
and easy. Links should be direct, follow desire lines
and avoid deviation to minimise distances travelled.
This involves looking at safe and attractive access
points into and through street blocks and to and from
everyday activity destinations. Design should give
special consideration to the young, old and those with
disabilities. Common issues include people having to
walk around ‘three sides of a square’ to get around
road junctions or having to wait excessive lengths
of time to cross roads using multi-staged, button-
controlled, crossings.
Accessibility considerations:
• Surfacing: cohesive/stable, level/ well- maintained
(designed to accommodate wheeled users)
• Gradient: free of abrupt changes (e.g. Slopes,
steps, kerbs)
• Access: free from barriers such as footway
obstructions (parked cars, street furniture (signs,
bins), overgrown foliage/vegetation)
• Continuity: continuous without gaps
• Directness: shortcuts and gates to respect desire
lines (filtered permeability) minimising detours
• Crossings: well-designed, efficient/well-timed
and direct pedestrian crossing opportunities at
junctions, roundabouts and across roads - to
respect desire lines
Safety and security considerations:
• After dark security: lighting
• Daytime security: cctv
• Visibility: overlooked, no blind corners/alleys
• Quality of space: friendly and interesting
surroundings (quality of built environment,
greenery, presence of people)
Comfort considerations:
• Drainage: well drained and free of puddles in the
wet
• Cleanliness: free of litter, grime and criminal
damage
• Nuisance: low perceived levels of noise and air
pollution
• Seating: provision of regular seating opportunities
Information provision considerations:
• Conspicuity: walking routes easy to find and follow
• Way-finding: presence of accurate, continuous,
legible directional information/signage (including
destinations, distances in time, and symbols and
pictures where appropriate)
• Visual clues: use of landmarks, focal points or
distinctive foliage
See Detailed Design Guidance (especially factsheet
P6) for further information
Design Principles:
Footpaths
Footpath through The Meadows Path across St Andrews Square
205

Page 200

153
Cycle paths between places such as neighbourhood
facilities and local transport services should be safe
and easy. Supporting facilities such as cycle parking
will need to be well-designed, easy and attractive to
use, and fit-for-purpose to encourage their use by
cyclists.
Accessibility considerations:
• Provision: Dedicated paths or shared paths with
pedestrians
• Gradient: Free of abrupt changes (e.g. slopes,
steps, kerbs) and as shallow as possible
• Width: Adequate to cater for likely future cycle and
pedestrian usage. (see factsheets)
• Directness: Cycle shortcuts and routes to respect
desire lines (filtered permeability) minimising
detours. Routes unimpeded by “no cycling”
regulations
• Continuity: Continuous without gaps
• Passage: Routes unimpeded by permanent barriers
or abrupt/sudden changes in direction
• Crossings: Well-designed, efficient/well-timed and
direct cycle crossing opportunities Toucan crossings
allowing cyclists to cross roads mounted
• Speeds: Appropriate design speeds on dedicated/
off-road cycle routes for a mix of riders (e.g.
8-20+mph)
• Surfacing: Cohesive/stable, level/well-maintained
(including road margins)
• Parking: Nearby off-site cycle parking and at local
destinations (e.g. post office/ convenience store)
• Conspicuity: Cycling routes easy to find and follow
• Way-finding: Presence of accurate, continuous,
legible directional information/signage/milestones
(including destinations, distances in time, and
symbols and pictures where appropriate)
See Detailed Design Guidance (especially factsheet
C8) for further information
Design Principles:
Cycle Paths
206

Page 201

154
Edinburgh is developing a network of Quiet Routes
specifically aimed at broadening the appeal of cycling
around the city. The routes seek to cater for the
many people who do not feel comfortable cycling
amongst any significant volume of motorised traffic.
The routes do not conform to the general movement
categorisation but require specific interventions,
notably high quality facilities for cyclist on busier
streets or any crossings of busier streets.
Streets and paths that are part of this network should
be designed in consultation with the Council’s Cycle
Team. As a general guide, the following principles /
standards will apply:
Local Streets
The emphasis will be on providing a high standard
of safe crossings where these streets join or cross
secondary or strategic streets.
Secondary Streets
Physically segregated cycle facilities (using kerb or
similar) will generally be necessary.
Strategic Streets
Physically segregated cycle facilities (using kerb or
similar) will always be necessary.
Map of ATAP Quiet Routes on CEC’s map website (http://edinburghcouncilmaps.info/LocalViewExt/Sites/Atlas/)
Design Principles:
Active Travel Action Plan (ATAP)’s Quiet Routes
207

Page 202

155
4.7   Quality Audit
A Quality Audit should be an integral part of street
design. The Quality Audit process aims to allow
for more innovative design solutions where overly
cautious practices can be avoided in favour of
creating places that are high quality and enjoyable
to use.
Use the Scottish Government’s Quality Audit
template to prove how design reflects the essence
and the requirements of this Guidance.
A Quality Audit draws together assessments
relating to a range of street users. By grouping the
assessments together and considering against
CEC’s overall street objectives and any specific local
objectives, any compromises in the design will be
apparent, making it easier for decision makers to view
the scheme in the round. Whilst they can be used at
initial design stages they add particular benefit once a
design has been developed in some detail whether on
an existing or new street.
A Quality Audit is not a tick box exercise, but should
be integral to the design and implementation of any
street design. A typical audit may include some of the
following assessments but the content will depend on
the type of the scheme and the objectives which the
scheme is seeking to meet:
• an audit of visual quality
• a review of how the street will be used by the
community;
• a Road Safety Audit;
• an inclusive access audit;
• a walking audit; and/or
• a cycle audit.
To assist with the Quality Audit process, CEC
have adopted the Quality Audit template and
accompanying guidance document, created by the
Scottish Government for Designing Streets, which can
be downloaded from the following web address:
http://www.creatingplacesscotland.org/designing-
streets/process/quality-audit
208

Page 203

156
Frequently Asked Questions
How does this guidance relate to Designing
Streets (DS)?
This Edinburgh Street Design Guidance aligns with
Designing Streets which will be the next point of
reference for issues that are not covered.
Is the approach in this guidance likely to
increase more risk than conventional designs?
The guidance itself should help justify the use of the
design approach it advocates, in addition to the use
of the quality audit approach. This involves balancing
new risks against benefits, for example reduced risk
to vulnerable users can be balanced against increased
risk to less vulnerable users.
The Council aims to create successful places with
fewer and less serious road casualties. To do this,
the Council sets a default design speed in residential
areas as 20mph; recommends the use of tighter radii
at junctions for cyclist safety and pedestrian crossing
convenience; supports the use of innovative concepts
to create psychological traffic calming; and aims to
optimise the use of pedestrian guardrail and minimum
the use of signs and markings. Further justification
for the design principles within this guidance can be
found in Designing Streets policy.
The guidance does not deal with a particular
design issue – should I revert to Design Manual
for Roads and Bridges?
The appropriate guidance suitable for urban streets
layout should be available within this guidance, and
Designing Streets makes it clear that Design Manual
for Roads and Bridges should not be used in urban
areas. There are however certain specific areas, for
example in relation to bridges or roads which provide
some form of structural support, where the Design
Manual for Roads and Bridges remains appropriate.
What about Safety and Safety Audits?
Safety audits, if appropriate, should not be carried out
in isolation but as an integrated part of a quality audit
that also checks the scheme’s compliance with its
objectives, and equalities legislation. The audit should
identify safety risks and the scale of these risks in
relation to the impact of reducing or eliminating
the risk on safety and other scheme objectives. For
example, whilst installation of guard railing may seem
to eliminate the risk of someone unwittingly stepping
off the footway into traffic, this benefit is likely to be
outweighed in many locations by its negative impacts
on pedestrian accessibility, safety of cyclists and
streetscape/visual impact.
Do the Construction (Design and Management)
Regulations 2015 still apply?
Construction (Design and Mangement) 2015
regulations came into force on 6 April 2015, and
encompasses the applicable law which applies to
the whole construction process on all construction
projects, from concept, through to completion,
maintenance and eventual demolition. Designers
must ensure that their designs comply with this
legislation and that their respective duties are carried
out.
What about Road Construction Consent (RCC)
and Adoption?
Provision of roads for new developments is controlled
and consented by the Council through the Roads
Construction Consent (RCC) process, governed by
Section 21 of the Roads (Scotland) Act 1984. For
the purposes of adoption, all streets are deemed
to be roads under this Act. If the road is adopted, it
will in the future be maintainable by the Council. In
general terms, a full adoption plan is expected to be
submitted by developers at the planning stage.
209

Page 204

157
Will the Council adopt landscape features?
Maintenance arrangements for all planted areas
should be established at an early stage, as they affect
the design, including the choice of species and their
locations. The approval and maintenance of proposed
planting within the road boundary will be required
to comply with Sections 50 and 51 of the Roads
(Scotland) Act 1984. Landscape features must be
included on the roads adoptions plan.
What about Sustainable Urban Drainage (SUDS)
features?
The Council will generally adopt SUDS features
which are included, or intended to be included within
adopted roads, or adopted landscape features. It is
important for SUDS designers to engage with the
Council at an early stage. ‘SUDS for Roads’ guidance
contains expert advice for designers on this matter.
Further information and guidance should be sought
from the Detailed Design Manual SUDS (factsheet
C5-2).
What about private streets?
Where a developer wishes streets to remain privately
maintained, conditions will be incorporated into
the planning approval to require the developer to
design, construct and to make arrangements for the
future maintenance of the new streets to a standard
acceptable to the authority and residents of the
development. This agreement may still require the
submission and approval of Road Construction
Consent under the terms of Section 21 of the Act, and
all roads serving more than 2 properties must be open
for public access (i.e. not gated).
Will design and approval processes take longer?
More often that not, identifying and resolving
conflicting interests/issues earlier in the design
process based on the principles set out in this
Guidance could actually reduce the time for the
approval and implementation stages of a scheme, as
the guidance follows Scottish Government policies
and principles, and the Council supports their use
through this Guidance.
Where can I get further help/advice?
Further advice can be sought by sending an e-mail to
the following:
street.design@edinburgh.gov.uk
210

Page 205

158
SITE & CONTEXT APPRAISALS
Description What should it contain/do? Scale What it is required for?
Historic/ Archaeological
Surveys and Heritage
Statements/ Conservation
Plans
Initial survey & appraisals of archaeology and the historic environment
relevant to the site context.
N/A For developments where there may be
sensitivities with regard to archaeology and the
historic environment and where the setting of
historic assets and places needs to be defined.
Landscape/Townscape &
Visual
Appraisals
See chapters 1.1, 1.2 and 2.1 of this Guidance. Appraisals are required for all applications.
Flood Risk Assessment Refer to flooding guidance set out on the Council’s
website. See Chapter 3.8 of this Guidance. The most up to date flood risk and
(where relevant) coastal erosion data should be used.
N/A Applications for development on land with a flood
risk.
Surface Water Management
Plan
Refer to flooding guidance set out on the Council’s
website. See Chapter 3.8 of this Guidance.
For all applications.
Habitat and protected
species surveys
Surveys in accordance with the requirements of the Biodiversity section of
this guidance, set out in Chapter 3.4.
For all applications unless identified that it is not
required at pre- application.
Tree survey A tree survey in accordance with BS 5837:2012 with accompanying plan
indicating exact tree positions and canopy extent.
A tree constraints plan in accordance with BS 5837:2012.
1:200 preferred.
1:500 may be
appropriate on
larger sites where
1:200 would not fit
onto A1 paper.
For sites where there are trees with a stem of
more than 75mm in diameter at 1.5m above
ground level on or within 12m of the site.
Stage 1 quality audit A strategic assessment of a range of issues relating to the design of streets
that can include the following issues:
• an audit of visual quality;
• a review of how the street will be used by the community;
• a road safety audit;
• an inclusive access audit;
• a walking audit; and
• a cycle audit.
Designing Streets (page 58) contains more information about Quality Audits.
N/A For applications for planning permission in
principle that involve the design of streets and
routes particularly where there are tensions
between different objectives.
Appendix A:  Information required for submission with a planning application
The following information is provided as a guide to the type of technical information that may be required for submission with a planning application.
The list is non exhaustive and additional information may be sought. In order to ensure planning applications can be progressed within agreed timescales, applicants
should agree with the planning authority the information to be submitted in advance of making a planning application.
211

Page 206

159
SITE & CONTEXT APPRAISALS
Description What should it contain/do? Scale What it is required for?
Stage 2 quality audit In accordance with the Transport for Scotland -
Transport Assessment & Implementation: A Guide.
N/A Applications for full planning permission and
approvals of matters specified in condition that
involve the design of streets and routes.
Transport information For all developments the following information is required:
• type and scale of development;
• detailed accommodation schedule;
• identification of existing transport information;
• details of proposed access for pedestrians and cyclists;
• details of proposed access to public transport facilities;
• comprehensive parking information; and
• mitigation measures (when low levels of parking proposed).
For larger developments the following additional transport information will
be required:
• trip generation and modal split forecasts;
• analysis of traffic levels;
• analysis of potential safety issues;
• how car use will be managed;
• measures considered to influence travel behaviour;
• demand management measures; and
• environmental impacts of transport.
N/A Transport information is required for all
developments.
The following are indicative of when additional
transport information is required:
Description  Gross Floor Area     
Greater than:
Housing   more than 50     
dwellings
Business  10,000m2
Industry   10,000m2
Storage and distribution  10,000m2
Other developments 5,000m2
Noise Impact Assessment • In accordance with requirements of Scottish Government’s Techical Advice
Note - Assessment of Noise.
N/A Pre application advice will help determine
whether this assessment is required.
INFORMATION REQUIRED
Description What should it contain/do? Scale What it is required for?
Location Plan This must identify the land to which the proposal relates and its situation in
relation to the locality - in particular in relation to neighbouring land (land
which has a common boundary or within 20 metres of the boundary of the
land for which development is proposed).  If public realm improvements
are required in the immediate vicinity of a development, the boundary line
should include these areas.
1:1250 (1:2500 acceptable
in countryside).
For all planning applications.
Existing and proposed floor
plans
a. the direction of North;
b. explain the proposal in detail;
c. show where existing buildings or walls are to be demolished;
d. show details of the existing building(s) as well as those for the proposed
development; and
e. show new buildings in context with adjacent buildings (including property
numbers where applicable).
1:100 (1:200 may
be acceptable for very large
buildings where 1:100 would
not fit on an A1 sheet)
(A scale bar should be
shown).
For all full planning applications and
where relevant for approval of matters
specified in condition (AMC)
applications. These may also be required
for some planning permission in principle
applications.  Pre application advice can
be provided to determine this.
212

Page 207

160
INFORMATION REQUIRED
Description What should it contain/do? Scale What it is required for?
Existing and proposed
elevations
a. show the proposed works in relation to what is already there;
b. show all sides of the proposal;
c. indicate, where possible, the proposed building materials and the style,
materials and finish of windows and doors;
d. include blank elevations (if only to show that this is in fact the case); and
e. where a proposed elevation adjoins another building or is in close
proximity, the drawings should clearly show the relationship between the
buildings, and detail the positions of the openings on each property.
Existing and proposed site
sections
a. show a cross section(s) through the proposed building(s);
b. where a proposal involves a change in ground levels, show both existing
and finished levels to include details of foundations and eaves and how
encroachment onto adjoining land is to be avoided;
c. include full information to demonstrate how proposed buildings relate to
existing site levels and neighbouring development; and
d. show existing site levels and finished floor levels (with levels related to
a fixed datum point off site), and also show the proposals in relation to
adjoining buildings (unless, in the case of development of an existing
house, the levels are evident from floor plans and elevations).
1:100 (1:200 may
be acceptable for very large
buildings where 1:100 would
not fit on an A1 sheet).
(A scale bar should be
shown).
For all full planning applications and
where relevant for approval of matters
specified in condition (AMC)
applications. These may also be required
for some planning permission in principle
applications.  Pre application advice can
be provided to determine this.
Roof plans To show the shape of the roof and specifying details such as the roofing
material, vents and their location.
Topographical survey
(existing)
Existing spot heights across the site and adjacent to the site. 1:500 or 1:200 (a
scale bar should be shown).
For all planning applications (with
exception of changes of use) where levels
need to be considered in detail.
Landscape layout plan/
masterplan
Plan to indicate the composite landscape proposals superimposed onto the
above topographical survey plan.  Existing retained features to be illustrated. 
Proposed levels to be indicated in contour and spot level format.  A disturbed
earthline should be shown so the extent of any earthworks is clear, An
accompanying descriptive key is required.
1:500 or 1:200 (a
scale bar should be shown).
For all planning applications where
there are external works and landscape
proposals.
Planting plan Plan that show the details of all proposed planting complete with
accompanying planting schedule. This should include levels against
Ordnance Survey datum. As well as the planted size, the eventual tree
canopy spread should be shown on drawings. See chapter 3.6 of this
Guidance.
1:200 preferred.
1:500 may be appropriate
on larger sites where 1:200
would not fit onto A1 paper.
For all applications where soft landscape
is proposed. For applications with limited
soft landscape this can be combined with
a hard landscape plan.
Hard landscape plan Plan that shows the proposed hard landscape materials including surface
finishes, street furniture, boundary treatments with product specification.
This should include levels against Ordnance Survey datum. See chapter 3.7
of this Guidance.
1:200 preferred.
1:500 may be appropriate
on larger sites where 1:200
would not fit onto A1 paper.
For all applications where hard landscape
is proposed. For applications with limited
hard landscape this can be combined with
a soft landscape plan.
213

Page 208

161
INFORMATION REQUIRED
Description What should it contain/do? Scale What it is required for?
Tree removal plan Plan showing any trees with a stem of more than 75mm in diameter at 1.5m
above ground level which will be removed as part of proposals.
1:200 preferred.
1:500 may be appropriate
on larger sites where 1:200
would not fit onto A1 paper.
For all applications where existing trees
are to be removed.
Tree protection plan Plan showing trees to be protected including  root protection areas,
protective barriers and any other tree protection measures - see chapter 3.5
of this Guidance.
1:200 preferred.
1:500 may be appropriate
on larger sites where 1:200
would not fit onto A1 paper.
For all applications where existing trees
require protection.
Maintenance & Management
Plans/ schedules
A plan or schedule to detail maintenance of the proposed soft landscape
and external works during the first year.  Also to provide details for long-
term management (which should include any retained trees/ woodland/
landscape on the site) and any factoring arrangements.  See chapter 3.6 of
this Guidance.
N/A For all applications where soft landscape
is proposed and where there are existing
areas of trees/ woodland that require
management
Swept Path Analysis for
Refuse Vehicle
A Swept Path Analysis for a refuse vehicle moving through the Development,
highlighting the location of the bin stores.
1:500 To ensure that the refuse vehicle can
move through the development without
overrunning footways, verges.  To ensure
that there is a direct route from the bin
store to the back of the refuse vehicle.
Cross Sections including
carriageway layout
Cross sections from building to building across the carriageway that would
include any kerb upstands, verges, planted areas.  This would include any
connections into the existing infrastructure.
1:100 This to make sure that all levels are
suitable.
Design Statement See chapter 1.3 Assessments & Statements of this Guidance. Applications for planning permission for
local development within:
a. a World Heritage Site;
b. a conservation area;
c. a historic garden or designed
landscape;
d. a National Scenic Area;
e. the site of a scheduled monument; or
f. the curtilage of a category A listed
building will require a design statement
unless the development comprises the
alteration or extension of an existing
building
Sustainability Statement
Form
A completed City of Edinburgh Council ‘S1 Sustainability Statement Form’. To determine sustainability measures for
non-householder applications.
Design and access statement See chapter 1.3 Assessments & Statements of this Guidance. Applications for planning permission for
major developments. Not required for
applications for planning permission in
principle.
214

Page 209

162
INFORMATION REQUIRED
Description What should it contain/do? Scale What it is required for?
Environmental protection
surveys
• Noise Impact Assessment - in accordance with requirements of Scottish
Government’s ‘Technical Advice Note – Assessment of Noise’;
• Odour Impact Assessment - in accordance with requirements with the
IAQM’s ‘Guidance of the assessment of odour for planning’;
• Air Quality Impact Assessment - in accordance with requirements of
Scottish Government’s ‘Delivering Cleaner Air for Scotland - Development
Planning and Development Management of Guidance from Environmental
Protection Scotland and the Royal Town Planning Institute’; and
• Ground contamination – in accordance with PAN 33 ‘ Development of
Contaminated Land’.
For all applications where noise, odour,
air quality and ground contamination may
be an issue.
Environmental Impact
Assessment (EIA)
Many of the above noted appraisals will form part of an EIA if one is deemed
to be required. A Screening Opinion should be sought from the Planning
Authority to determine what appraisals will be required as part of the EIA.
Refer to Scottish Government’s guidance on EIAs.
To assess the environmental impacts of all
developments as defined under Schedule
1 and developments under Schedule 2
where they are likely to have a significant
effect on the environment.
215

Page 210

163
Appendix B:
Edinburgh Street Design Guidance
Detailed Design Manual and Index
216

Page 211

164
Edinburgh Street Design Guidance : Detailed Design Manual Version: V1.0 2017
Introduction
What is this Guidance
for?
The Detailed Design Manual
consists of a series of
technical details, referred to
as ‘Factsheets’.
These provide more
detailed design guidance to
be applied  when designing
new and altering or
maintaining existing streets
(including urban paths) in
Edinburgh.
Factsheets Outline
The Factsheets covers
number of design related
topics including:
• Cycling Environment (C)
• Street Furniture and
Landscaping (F)
• Geometry (G)
• Materials (M)
• Pedestrian
Environment (P)
• Public Transport (PT)
• Storm Water Management
(W)
Acknowledgements
The City of Edinburgh Council
thanks the following
organisations for their support
in the developed of the
Factsheets:
• Sustrans
• Transport for London
• Paths for All
• Edinburgh Access Panel
• Transport Research
Institute, Edinburgh
Napier University
The City of Edinburgh Council
accepts responsibility for any
content of these factsheets,
based on documents or images
produced by third parties.
Version Control
Unlike the conventional
guidance documents,
Factsheets are version
controlled individually. All
together they form the
Detailed Design Manual.
The first issued version of
the Factsheet in 2017 is
v1.0. Amendments should
be recorded on the cover
page of individual
factsheets.
217

Page 212

165
Edinburgh Street Design Guidance : Detailed Design Manual Version: V1.0 2017
Note: Grey factsheet titles shall be available at a later date.
Introduction - Contents
Pedestrian Environment
P1 Street as a Place
P2 Promoting Pedestrian
Movement & Activity
P3 Footways
P4 Vehicle Crossovers on Footways
P5 Pedestrian Guardrail
P6 Footpaths
P7 Minimising Street Clutter
P8 Pedestrian Streets
Cycling Environment
C1 Designing for Cycling
C2 Cycle Lanes
C3 Segregated Cycle Tracks – Soft
Segregation
C4 Segregated Cycle Tracks – Hard
Segregation
C5 Contra-flow Cycling on One-way
Streets
C6 Cycling in New Developments
C7 Cycle Parking
C8 Shared Pedestrians Cycle Paths –
Off Street
Public Transport
PT1 Designing for Public
Transport
PT2 Bus Stops
PT3 Bus Priority
Street Geometry
G1 Street Geometry and Layout
G2 Carriageway Widths
G3 Omitting Centrelines
G4 Crossings
G5 Crossings at or Near
Junctions
G6 Speed Reduction and Traffic
Management
G7 Priority Junctions
G8  Junctions
G9  Parking and Loading
G10 Road Bridges
G11 Road Construction Consent
(RCC)
Street Furniture and
Landscaping
F1 Street Furniture
F2 Seating
F3 Signage
F4 Waste Management
F5 Street Trees
F6 Street Lighting
Materials
M1 Footway Materials &
Surfacing
M2 Asphalt Footway
M3 Footway Paving
M4 Tactile Paving
M5 High Friction Surfacing
M6 Setted Streets
Storm Water Management
W1 Sustainable Urban Drainage
Systems (SUDS)
W2Drainage
218

Page 213

166
Edinburgh Street Design Guidance : Detailed Design Manual Version: V1.0 2017
Introduction - Summaries
Cycling Environment
C1 Designing for Cycling
Introduces the key considerations when designing for cycling in
Edinburgh. Covers aspects such as QuietRoutes, cyclist protection
and visibility at junctions. Statements on cyclist interaction with
roundabouts and tram tracks.
C2 Cycle Lanes
Introduces mandatory and advisory cycle lanes, providing guidance
on the design and layout of these. Includes aspects such as:
integration with junctions, parking, materials and dimensions.
C3 Segregated Cycle Track – Soft Segregation
C4 Segregated Cycle Track – Hard Segregation
Covers aspects of segregated cycle tracks using hard segregation.
Discusses methods and layouts of the hard segregation measures
whilst also covers the integration of such measures within the
existing street environment, covering junctions, crossings and side
roads.
C5 Contra-flow Cycling on One-way Streets
C6 Cycling in New Developments
C7 Cycle Parking
C8 Shared Pedestrians Cycle Paths – Off Street
Pedestrian Environment
P1 Street as a Place
Introduces the principles for designing street layouts to adequately
cater for all users and uses. Introduces urban connectivity, active
travel, public transport and key desired characteristics.
P2 Promoting Pedestrian Movement & Activity
Provides guidance on ways to promote use of pedestrian areas.
Examples of pedestrian use analysis techniques and coverage of
the relevant equality legislation.
P3 Footways
Guidance on the width requirements of footways and the roles of
the different footway zones. Includes specific guidance on the
location of tables and chairs and advertising boards in the footway.
P4 Vehicle Crossovers on Footways
P5 Pedestrian Guardrail
Describes the pedestrian guardrail assessment process and under
what circumstances it is used. Also highlights the link to cycle
parking.
P6 Footpaths
P7 Minimising Street Clutter
Provides guidance on, and examples of, how to reduce street
clutter. Identifies a process for a “de-cluttering assessment” to
assist the developer to adopt a sensible approach. Highlights areas
such as: street furniture, traffic signs and road markings.
P8 Pedestrian Streets
219

Page 214

167
Version: V1.0 2017Edinburgh Street Design Guidance : Detailed Design Manual
Introduction - Summaries
Public Transport
PT1 Designing for Public Transport
PT2 Bus Stops
PT3 Bus Priority
220

Page 215

168
Edinburgh Street Design Guidance : Detailed Design Manual Version: V1.0 2017
Introduction - Summaries
Geometry
G1 Street Geometry and Layout
Introduces the importance of street geometry and layout in
influencing road user behaviour, provides examples of changes
that can be made and the effects that these have.
G2 Carriageway Widths
G3 Omitting Centrelines
Introduces the speed reduction benefits of removing carriageway
centrelines. It provides a case study discussing a trial of this in
London and also gives examples of how centrelines can be
reintroduced in higher risk areas.
G4 Crossings
Guidance on the selection of a crossing type, its location and
layout, dimensions, kerb details and advice for specific situations
for crossings at or near junctions. Includes details on signalised
crossings, zig zags, studs, bridges and underpasses.
G5 Crossings at or Near Junctions
Explains the benefits of locating crossings at or near junctions and
provides guidance on how to mitigate the risks of this. Provides
practical guidance on implementation along with example layout
options and minimum dimensions.
G6 Speed Reduction and Traffic Management
Describes methods of encouraging road users to reduce their
speed. These include reducing visibility, changes in materials,
reducing lane widths or the inclusion of speed cushions. Also
provides examples of these.
G7 Priority Junctions
Provides guidance on principles for priority arrangements at
crossroads and T-junctions. Gives examples of different methods
of establishing pedestrian priority, with a particular emphasis on
continuous footways, for which more detailed guidance is
provided.
G8 Junctions
G9 Parking and Loading
G10 Road Bridges
G11 Road Construction Consent (RCC)
221

Page 216

169
Edinburgh Street Design Guidance : Detailed Design Manual Version: V1.0 2017
Introduction - Summaries
Materials
M1 Footway Materials & Surfacing
Provides guidance on the appropriate materials to use for
footways in Edinburgh, with specific attention given to historic
areas. Provides examples and guidance on construction, water
channels, tactile surfaces and boundary protection.
M2 Asphalt Footway
Supplements M1, providing more detailed guidance on the
requirements and specification for asphalt footways.
M3 Footway Paving
Explains in further detail the requirements for installation of
natural stone and concrete paving, and the maintenance of
historic paving. Provides information on layout of corners, edges
and inspection covers.
M4 Tactile Paving
Provides detailed guidance on the different types of tactile paving
used by the City of Edinburgh Council. Includes information on
application, installation and layout for all types discussed.
M5 High Friction Surfacing
Guidance on the requirements for high friction surfacing. Includes
details on the required polished stone value (PSV) and the lengths
of high friction surfacing required for different speed limits.
M6 Setted Streets
Street Furniture and Landscaping
F1 Street Furniture
Provides guidance on the key considerations for installing street
furniture, giving advice on how it should work with other elements
of the street. Specifically covers location, spacing, interaction with
junctions and the relevant kerb zones.
F2 Seating
Provides guidance on the requirements of public seats to be used.
Guidance is provided on the location, dimensions, material and
type of seats to be used, with examples provided.
F3 Signage
Provides guidance on the requirements of different types of sign
that are used by the City of Edinburgh Council. Guidance is
provided on the location, dimensions and type of signs to be used,
referencing the Traffic Signs Manual.
F4 Waste Management
F5 Street Trees
F6 Street Lighting
222

Page 217

170
Version: V1.0 2017Edinburgh Street Design Guidance : Detailed Design Manual
Introduction - Summaries
Storm Water Management
W1 Sustainable Urban Drainage Systems (SUDS)
W2 Drainage
223

Page 218

171
Edinburgh Street Design Guidance : Detailed Design Manual Version: V1.1 2019
FactsheetIndex
Subject Page
A History of Street Lighting in the Old and New Towns of
Edinburgh World Heritage Site (2012)
F6.9
A Sustainable Lighting Strategy for Edinburgh, 2012 F6.1, F6.2,
F6.9
Access to bus stops PT2.2
Active travel action plan C1.4
Active travel networks P1.5
Advanced stop line M5.3
Advertising boards (A-boards) P3.7
Advisory cycle lanes C2.1-2
Bus stops C2.4
Crossings C2.4
Dimensions C2.2
Integration with junctions C2.5
Materials C2.2
Parking and loading C2.4
Side roads C2.4
Asphalt footway
Construction requirements M2.1
Crossfall M2.2
New developments M2.2
Where to lay it M2.1
BD 29/17 - Design criteria for footbridges G4.17
Subject Page
BS 5489-1: 2003 - Code of Practice for the Design of Road
Lighting
F6.2
BS 5837: 2012 - Trees in relation to design, demolition and
construction – Recommendations
F6.7
Boundary protection M1.2
Buffers/Islands C4.10-12
Buffer/Separation strip C4.9
Build outs G7.1, G7.2,
G7.6
Bus boxes PT2.10
Bus lanes
Cyclists PT3.2
Lane widths PT3.2
Operational hours PT3.2
Signs and road markings PT3.2
Waiting restrictions PT3.2
Bus laybys PT2.11
Bus only streets PT3.1
Bus priority PT1.1
Cyclists PT3.3
Options PT3.3
Signal priority PT3.1, PT3.3
Traffic calming PT3.1, PT3.4
224

Page 219

172
Edinburgh Street Design Guidance : Detailed Design Manual Version: V1.1 2019
FactsheetIndex
Subject Page
Considerations C3.14
Cycle track through bus boarder C4.17,
C4.21-22
Design principles PT2.1-3
Floating bus stop C4.17-20
Floating Bus Stops – Bus shelter located on footway C3.16
Floating Bus Stops – Bus shelter located on island C3.15
Footway PT2.4
Integration with soft segregation C3.13
Kerbs PT2.11
Layout PT2.3
Placement and location PT2.2
Shared use footway C4.17
Bus shelters
Dimensions PT2.8
Location on footway PT2.7
Shelter or no shelter? PT2.5
Types PT2.6
Bus stop assessment process PT2.2
Bus turning circles PT2.12
Carriageway geometry PT1.3
Carriageway Make up PT2.8
Subject Page
CCTV P3.4
Central cycle tracks C4.1
Commercial footway crossovers
Layout P4.2
Location P4.2
Materials P4.2
Rear of footway P4.2
Widths P4.2
Concrete paving/artificial stone
British standards M3.2
Corner details M3.8
Design considerations M3.1
Flag cutting M3.2
Joint detail M3.2
Laying detail M3.2
Paving patterns M3.2
Continuous footways G7.2, G7.7-
12
Design details: layout options G7.9-10
Construction and materials G7.11-12
Layout and ramp gradients G7.8
Legal status G7.7
225

Page 220

173
Edinburgh Street Design Guidance : Detailed Design Manual Version: V1.1 2019
FactsheetIndex
Subject Page
Traffic management PT3.1, PT3.4
Bus routes PT1.1-2
Bus stops PT1.1,
PT2.1-12
Bus boarders PT2.9
Bus Boarder – Cycle track through bus boarder C3.17
Bus Boarder – Shared use footway C3.18
Signs and markings G7.8
Surface materials G7.11
Combined Cycleways/Footways F6.11
Conservation Areas F6.10
Contraflow Cycling
Advisory Contraflow C5.5
Decision Process C5.4, C5.6,
C5.7, C5.8
Layout Configurations C5.9-C5.11
Mandatory Contraflow C5.5
Parking C5.2
Segregated Contraflow C5.5
Street Widths C5.2
Unsegregated Contraflow C5.5
Corner Radii PT1.3
Subject Page
Effect on pedestrians G6.3
Maximum corner radii G6.4
Overrun of corners G6.4
Use of full carriageway width G6.4
Vehicle tracking G6.4
Cross section examples C4.7
Crossover details P4.3
Crossings
Bridges G4.17
Choosing a crossing G4.3
Close to a junction G5.2
Design G4.4
Desire lines G4.2
Integration with crossings C4.33
Integration with soft segregation C3.20
Pedestrian crossings of the cycleway C4.32
Key design principles G4.2
Layout options for crossings close to junctions G5.6-G5.9
Offset from a junction G5.2
Options G4.1
Refuge island crossings G4.7-8,
G4.13
226

Page 221

174
Edinburgh Street Design Guidance : Detailed Design Manual Version: V1.1 2019
FactsheetIndex
Subject Page
Designing for
20mph G6.8
Cycle separation from traffic C1.10
Cyclist protection from motorised traffic C1.11-12
Cyclist visibility at junctions C1.9
Place P1.4
Public transport P1.4, PT1.1
Speed reduction P1.4
Walking and cycling P1.4
Designing inclusive streets P2.6
Design speed on new streets G6.8
Designing Streets, Scottish Government G6.1, G6.3,
G6.5-6,
G6.8, P2.8
Desired street characteristics P1.1
Deviation from National Guidance G5.1, G5.3
DfT Circular 01/2016, The Traffic Signs Regulations and
General Directions 2016
F6.12
Diagram 610 G4.7
Distance to crossing studs G4.14-15
DMRB HD28/15 M5.2
DMRB HD36/06 M5.1
DMRB – TA57/87 F1.5
Subject Page
Signalised crossings G4.12-13
Uncontrolled drop kerb G4.5-6
Underpasses G4.16
Why provide crossings at or near junctions? G5.1-G5.3
Cycle friendly city C1.4, C1.7
Cycle friendly traffic management G6.12
Cycle parking P3.1
Cycle route design principles C1.2
Cycle tracks on hills C4.3
Cycleways F6.11, M2.2
De-cluttering assessment P3.5
Part A: Audit inventory P3.6
Part B: Opportunities for decluttering P3.7
Part C: Action the Preferred Design Solution P3.20
Process for traffic signs P3.8-13
Process for road markings P3.14-15
Process for street furniture P3.16-19
Demonstrating connectivity P1.3
Department for Transport’s Manual for streets G3.2, G6.1,
G6.3, G6.5-
6, G6.8
Design priorities P2.7
227

Page 222

175
Edinburgh Street Design Guidance : Detailed Design Manual Version: V1.1 2019
FactsheetIndex
Subject Page
Dropped Kerb Crossings G7.5
Edges M3.10
Electric Vehicle Charging Points F6.3
Energy Efficient Lighting F6.1
Equality Act 2010 P2.6, P2.8
Equality and Rights Impact Assessment (ERIA) P2.8
Equality/accessibility P3.4
Existing crossings near or at junctions G5.4, G5.5
Existing streets PT1.3
False One Ways C5.1
Flexible posts C3.1-2
Batons/ wands C3.3, C3.4
Satellite Islands C3.3, C3.5
Wand orcas C3.3, C3.5
Footpaths
Definition P6.1
Dimensions P6.1
Footway construction M1.2
Footway materials
Asphalt M1.3-4
Concrete paving/artificial stone M1.3-4
Natural stone M1.3-4
Subject Page
Resin bound gravel M1.3
Setts M1.3
Footway width requirements P3.1-3
Footway zones
Clear footway zone P3.4
Frontage zone P3.4-5
Furniture zone P3.4-5
Kerb zone P3.4
Furniture zone F1.2-4
Guidance Note for Local Authorities - Reducing Sign Clutter
(TRL) 2010
P3.20
Guidance on the use of Tactile Paving Surfaces, 1998 C3.20,
G4.12, M4.4
Here and Now studies P2.2
Highway Code M5.3
Historic environment M1.1
Historic Lighting Columns F6.10
Historic paving
Protection M3.6
Repairs M3.6-7
HSG47 'Avoiding danger from underground services‘ F6.8
HSG185 'Safety in excavations' F6.8
Illuminated Traffic Signs and Bollards F6.12
228

Page 223

176
Edinburgh Street Design Guidance : Detailed Design Manual Version: V1.1 2019
FactsheetIndex
Subject Page
Inclusive Mobility P2.8
Inspection cover details M3.9
Integration with parking/loading
Floating loading island C4.13, C4.15
Floating parking bays C4.13-14
Parking / Loading Bays inset into separating island C4.13, C4.16
Junctions
Cycle gate at signal controlled junctions C4.37
Holding the left turn at signalled junctions C4.36
Integration with signal controlled junctions C4.34
Two stage right turn and early release at signal
junctions
C4.35
Keep left bollards G4.7
Kerbs and other separation options C4.8
Licensing P3.4
Lighting G4.7
Landscaping objects C3.1-2, C3.3
Local Cycling and Walking Infrastructure Plans (2017) C1.3
Local Transport Note (LTN) 1/95 C3.20, G4.2,
G4.12
Local Transport Note (LTN) 2/95 C3.20, G4.2,
G4.9, G4.12,
G5.1, G 5.3
Locating Street Lighting
Subject Page
At Crossings F6.5
Back of Footway F6.6
General Principles F6.3-F6.4
Front of Footway F6.6
Supply Pillars F6.5
Wall Mounted F6.5
Low level separators C3.1-2
Armadillos/ Zebras C3.3, C3.6
Orcas C3.3, C3.7
Mandatory cycle lanes C2.1, C2.3
Bus stops C2.4
Crossings C2.4
Dimensions C2.3
Integration with junctions C2.5
Materials C2.3
Parking and loading C2.4
Side roads C2.4
Making Space for Cycling (2014) C1.3
Materials palette P3.4
Minimising street clutter – principles P3.1
Minimum treatment length M5.3-4
Natural stone
British standards M3.4
229

Page 224

177
Edinburgh Street Design Guidance : Detailed Design Manual Version: V1.1 2019
FactsheetIndex
Subject Page
Corner details M3.8
Design considerations M3.3
Flag cutting M3.4
Finishes M3.5
Joint detail M3.4
Laying detail M3.4
Omitting centrelines
Centreline removal trial G3.2
Risk mitigation in exceptional circumstances G3.3
One way flow C4.1, C4.4,
C4.6
One-Way Plugs C5.1, C5.3,
C5.4, C5.5
PAN 51: Planning, Environmental Protection F6.2
PAN 77: Designing Safer Places F6.2
Parking P3.4
Parking and loading – integration with soft segregation C3.8
Floating parking/loading bays C3.9
Inset or on-footway parking/loading bays C3.10
Kerbside parking/loading C3.11
Part-time Soft Segregation Cycle Lane with Kerbside
Parking / Loading Bays
C3.12
Paths F6.11
Subject Page
Pedestrian guardrail assessment P3.1
Pedestrian Movement and Activity
Analysing P2.2
Comfort assessments P2.2, P2.4-5
Desire lines P2.2
Flow counts P2.2
Origin-destination assessments P2.2
Pedestrian desire lines P2.2, P2.3
Pedestrian environment review system P2.2
Promoting P2.1
Qualitative observations P2.2
Shared use interaction analysis P2.2
Static activity assessments P2.2
Pelican crossings
Existing with in 15m of a junction G5.5
Polished stone values (PSV) M5.2
Priority junctions
Carriageway design G7.1
Crossing width G7.1
Cycling provision G7.1
Design principles G7.1
Drainage G7.1
230

Page 225

178
Edinburgh Street Design Guidance : Detailed Design Manual Version: V1.1 2019
FactsheetIndex
Subject Page
Protection from parking and vehicle over run M1.2
Public Advice Note (PAN) 78: Inclusive Design P2.8
Public transport oriented neighbourhoods P1.6
Puffin crossings
Existing with in 15m of a junction G5.5
On closed side streets G5.6
On one way plugs/side streets G5.6
Pros and cons G5.6
On two way side streets G5.6
QuietRoutes C1.1, C1.4-
6, G4.3,
G4.14, G5.1,
G5.2, P1.5
Raised tables G7.2, G7.6
Red Chips C5.8
Reduced clear kerb zone F1.5
Reducing sign clutter (TAL 01/13) P3.1, P3.5,
P3.7
Reducing Street Clutter F6.12
Refuge islands G7.2
Residential footway crossovers
Layout P4.1
Location P4.1
Materials P4.1
Subject Page
Rear of footway P4.1
Widths P4.1
Materials P4.1
Rear of footway P4.1
Widths P4.1
Road markings P3.3, P3.14-
15
Roundabouts C1.13, G4.11
Seating
Design considerations F2.2
Dimensions F2.3
Location F2.1
Materials F2.3
Segregation and user needs C4.2
Shackel, S. C. and Parkin, J. (2014) Influence of road
markings, lane widths and driver behaviour on proximity
and speed of vehicles over-taking cyclists. Accident
Analysis & Prevention
G3.1
Shared use interaction analysis P2.2
Side roads integration C4.23
Bending in C4.25, C4.29
Bending out C4.24, C4.28
Cyclist give way C4.25, C4.31
Full closure C4.25, C4.30
231

Page 226

179
Edinburgh Street Design Guidance : Detailed Design Manual Version: V1.1 2019
FactsheetIndex
Subject Page
No deviation C4.24, C4.26
One way side street C4.24, C4.27
Side road provision – integration with soft segregation C3.19
Signage C1.8
Signs
Controlled parking F3.2
Design requirements F3.1
Directional for cyclists F3.2
Pedestrian wayfinding F3.2
Temporary F3.2
Traffic F3.2
Waiting and loading F3.2
Soft Segregation - advantages/ disadvantages C3.1
Special materials M1.1
Speed reduction and traffic management
Changes in priority G6.1
Landscaping G6.9
Materials G6.2
Physical features G6.2
Reductions in forward visibility G6.2, G6.5-6
Temporary F3.2
Traffic F3.2
Subject Page
Waiting and loading F3.2
Soft Segregation - advantages/ disadvantages C3.1
Special materials M1.1
Speed reduction and traffic management
Changes in priority G6.1
Landscaping G6.9
Materials G6.2
Physical features G6.2
Reductions in forward visibility G6.2, G6.5-6
Speed humps and cushions G6.11
Street dimensions G6.1
Street features G6.1
Street furniture G6.9
Vertical traffic calming G6.10
Static activity assessments P2.2
Stopping distance M5.3
Start of segregation C4.12
Stopping distances G4.16
Street furniture P3.4, P3.16-
19
Street furniture layout
Controlled/allocated parking areas F1.7
232

Page 227

180
Edinburgh Street Design Guidance : Detailed Design Manual Version: V1.1 2019
FactsheetIndex
Subject Page
Junctions F1.6
Key considerations F1.1
Location F1.1
Multiple function street furniture F1.1
Spacing F1.1
Street Geometry and Layout G1.1
Street Trees F6.7
Surface materials P3.3
Sustrans Design Manual – Chapter 4 C5.1, C5.2
Sustrans Design Manual – Chapter 7 C1.13
Sustrans Design Manual - Handbook for Cycle Friendly
Design
C1.9, C2.5,
G4.17
Sustrans National Cycle Network Design Guidance C1.5
TA 90/05 - The geometric design of pedestrian, cycle and
equestrian routes
G4.17
Tables and chairs P3.6
Tactile paving M4.1, G4.5
Blister M4.3-5
Colours M4.1
Corduroy M4.3, M4.9
Crossings M4.6-7
Departures M4.2
Guidance M4.3,
M4.11-12
Subject Page
Inspection chambers M4.1, M4.13
Ladder/Tramline M4.3, M4.8
Lozenge M4.3, M4.10
Tactile tail M4.7
Temporary tactile M4.1
Tactile surfaces M1.2
TD 36/93 - Subways for Pedestrians and Pedal Cyclists
Layout and Dimensions
G4.17
Technical Information Note No. 29 - Lighting of Cycle Paths F6.11
The Traffic Signs Regulations and General Directions 2016 P3.1
The Zebra, Pelican and Puffin Pedestrian Crossings
Regulations and General Directions 1997
G4.2
Toucan crossings
Existing with in 15m of a junction G5.5
On closed side streets G5.6
On one way plugs/side streets G5.6
Pros and cons G5.6
On two way side streets G5.6
Traffic Advisory Leaflet 1/06: General Principles of Traffic
Control by Light Signals, 2006
C3.20
Traffic Advisory Leaflet 01/12: The Traffic Signs
(Amendment) (No.2) Regulations and General Directions
2011
P3.7
Traffic Advisory Leaflet 3/03: Equestrian Crossings, 2003 C3.20
233

Page 228

181
Edinburgh Street Design Guidance : Detailed Design Manual Version: V1.1 2019
FactsheetIndex
Subject Page
Traffic Advisory Leaflet 5/05: Audible and Tactile Signals at
Signal-Controlled Junctions
C3.20, G4.2,
G4.12,
G4.14
Traffic management measures G6.7
Traffic signs P3.2, P3.8-
13
Traffic Safety on One-way Streets with Contraflow Bicycle
Traffic
C5.1
Traffic Signs Manual – Chapter 1 F1.5
Traffic Signs Manual - Chapter 5 C2.2-3,
G4.14
Tram tracks C1.13
Transport Research Laboratory (TRL) PPR703 C4.26,
C4.28-29,
C4.31
Transport Research Laboratory (TRL) report 367 M5.3
Transport Research Laboratory (TRL) Report 421 G6.1
Transport Research Laboratory (TRL) 641 G3.2
Transport Research Laboratory (TRL), Factors Influencing
Pedestrian Safety: A Literature Review 2006
G4.14, G5.1
TSRGD 2016 F3.1, P3.2,
P3.7
Two way flow C4.1, C4.4-6
Urban connectivity P1.2
Utilities F6.8
Utility access PT2.3
Subject Page
Waiting/loading restrictions G4.5
Water channels M1.2
Wayfinding products P3.8
Width of dropped kerbs G4.5
World Heritage Sites F6.9
Zebra/tiger crossings G4.9-11
Zigzags G4.16
234

Page 229

182
Appendix C:  Protected views - Detailed guidance on the landmark features
Taken from the ‘Skyline Report: The Protection of Key
Views’ report to Planning Committee 28th February
2008.
The Castle, Castle Rock and Tolbooth St
John’s Spire
Guidance:
In order to protect the views of Castle Hill, the Castle
and Tolbooth St John’s spire, rooftops in the central
core of the city, should remain below the bottom of
the sky space around the Castle: this recedes in all
directions from the cliffs below the Castle and the
landform below Castle Hill.
Perception of the Castle and Castle Rock is enhanced
by awareness of the height of the castle and St John’s
spire above the surrounding city. This depends upon
seeing both the monuments and the landform from
which they rise, particularly the cliffs below the Castle.
In order to achieve this, surrounding rooftops should
not rise above a plane which represents the bottom of
open sky surrounding the city centre. This would also
protect outward views towards the hills and the sea
from the Esplanade and the Castle.
While many spires and domes and monuments rise
above the bottom of the sky space and contribute
positively to the skyline of the city, roof levels in the
city centre have reached a general height above which
higher new development is beginning to intrude upon
the character of both inward and outward views.
Calton Hill
Guidance:
In order to protect the views of the Calton Hill
monuments and the hill from which they rise, the
sky space defining the bottom of open sky around
the Castle and Castle Hill, should include the
surroundings of Calton Hill.
Close views to Calton Hill from along Princes St and
from the north are rising sight lines. The same applies
to views from east and south. In these cases of
comparatively short views (within a distance of 2km),
the foreground is sensitive to excessive height where
the tops of buildings can easily cut off parts of the
view.
From higher viewpoints, the backdrop to Calton Hill is
particularly important, since the hilltop monuments
are seen against open sky or distant water.
Three distant views need protection:
• from Constitution St - the narrow street view is a
rising sightline, the foreground of which needs
protection,
• from Corstorphine Hill - the view from Corstorphine
Hill needs foreground protection,
• from Braid Hills Drive -the whole of the foreground
needs protection but the backdrop is not
considered critical as long as the top of the Nelson
Monument remains silhouetted against the sky.
Castle Hill from Surrounding Hills, Lower
Viewpoints and Approach Roads
Guidance:
The dramatic silhouette of the Castle, cliffs and St
John’s spire seen in space from surrounding hills,
suburban roads and lower viewpoints, should be
safeguarded.
The protection of the long views to the Castle and
the St John’s spire will be achieved by securing the
foreground within the viewing corridors of certain
key views. Backdrop skyspace is important to the
perception of the silhouette.
In order to protect the primacy of the Castle and St
John’s spire, an open space zone around the Castle
and spire should preclude any upstanding building.
This defines the width of the view cones as they pass
Castle Hill.
235

Page 230

183
Coastal Backdrop to Views of Castle Hill
and Calton Hill
Guidance:
Development in coastal backdrop areas should be
kept at heights such that key profiles are clearly
perceived against distant sea, hills or sky.
For the most part the relevant views will be from the
south looking towards Castle Hill and Calton Hill with
the Firth of Forth in the background. In many cases the
coastal backdrop coincides with the lengths of coast
which lie in sea views from the city centre (see below).
The latter are at right angles to the street layout of the
New Town and the Royal Mile.
Each distant view of the sea needs to be evaluated
to determine what length of background needs to be
protected, for example, the amount of open water
around the Castle when viewed against the Firth of
Forth.
In a similar way to which the bottom of open skyspace
was defined around the city centre, the bottom of
open sky, in the background to views, can be defined
along the coast.
Views of the Firth of Forth from the City
Centre
Guidance:
Looking north from the New Town and east from the
Old Town, wherever sea is visible, open sky space is to
be safeguarded down to low levels.
The grid pattern layout of the New Town related to
the underlying topography, creates a series of framed
views of the sea. Diagonal views are screened by
buildings or hills. In the same way, the Royal Mile
overlooks a framed sea view to the east - which is
within the same area of sea viewed from North Bridge
and, more distantly, Corstorphine Hill. The amount
of visible sea varies along different alignments, but
in some cases the narrowness of the band of water
makes it susceptible to any loss of vertical space by
increasing building height at certain critical locations.
Open Sky beyond New Town Streets
Guidance:
Sightlines rising beyond the ends of New Town streets
should be safeguarded.
Other than the westerly view along Princes St, these
are rising sightlines.
The formality of many of these streets lends itself
to the placements of objects - spires, domes,
monuments and statues, at the end of the streets, eg
the Melville Monument looking east down George St.
Views of Open Hills
Guidance:
Key views of hills from within the city should
be safeguarded by protecting selected viewing
corridors towards Salisbury Crags, and Arthur’s Seat,
Corstorphine Hill, and the Pentland Hills. Open ground
should be safeguarded down to the foot of the hills.
Arthur’s Seat
The key quality to safeguard is the unbroken skyline
from every direction, usually above the 100 m contour.
Long views from the south show the whole profile of
the hill to the distant sea beyond.
Salisbury Crags
Close views to the crags are often framed by streets
(eg from the Pleasance). These are most striking
when unobstructed by buildings across the ends of
streets. It is important to retain open hillside below
the cliffs. Long views from the south show sightlines
falling towards a backdrop of sea and sky. The amount
of open sea requiring protection varies between
viewpoints.
Corstorphine Hill and Pentland Hills
Sightlines to the Pentland Hills are rising lines.
However, as the landform is also rising, there are
places where the bottom of the skyspace is close
to the ground contours. This is particularly the case
across the West End and Fountainbridge, as seen
from Ferry Road and the Botanical Gardens. In these
instances, a few metres of extra roof height can have
an impact on perception of the profile.
236

Page 231

184
City Silhouette from the North
Guidance:
In order to safeguard the city silhouette from the
north, background skyspace should be kept open and
foreground roof levels should be kept down.
The silhouettes from the north are so wide that
viewing corridors are not so helpful.
Skyline between the Castle and Arthur’s Seat
This section of skyline consists of a long series of
spires and towers. They show up against the sky
because they rise above the roof levels. The roof
levels have reached critical height where a rise in
height would diminish the quality of the skyline.
Sightlines beyond this long silhouette generally
pass high above the southern side of the city and are
safeguarded by the roof planes needed to protect
views from the south.
Skyline west of the Castle
West of the castle the skyline is lower. To protect the
silhouette, the whole skyspace needs to be carefully
restrained by definition of maximum roof levels.
The Foreground
The foreground of views from the north is sensitive to
obstructions as the sight lines rise gradually across
open spaces. This same skyline is enjoyed from
the north shore of the Firth of Forth and from ships
sailing up the Forth. While it is desirable to keep open
sightlines along the coast, short lengths of taller
buildings, well arranged, would not deprive ship
passengers of experiencing the city’s iconic distant
silhouette.
The Forth Bridges
Guidance:
Where views to the Forth Bridges are intervisible with
key features of the city, they should be safeguarded.
Views to the Forth Bridges from Edinburgh are
limited and it is not generally considered that special
measures are required for their protection. The most
impressive view is from Leith Docks Development Area
and care should be taken to ensure it is safeguarded.
There is additional guidance protecting 4 specific
views of the Forth Bridges as part of the World
Heritage Site listing.
Incidentals
Guidance:
The foreground and relevant backdrop to special
views should be safeguarded.
A limited number of additional special features make
a particular contribution to the skyline, and these
should also be safeguarded.
St Mary’s Cathedral Spires
There are several important views to the triple spires
of St Mary’s Cathedral from the west, south west
and north of the city. Roof levels in the West End are
important to a clear perception of the spires.
Views from the Dean Bridge
The view west of the Dean Bridge, of sky or
Corstorphine Hill needs protection.
Fettes College
The background to the view of Fettes College from
Queensferry Road needs to be protected from
buildings rising above the tree canopy along the ridge.
Eastward sea views from Dunsapie Loch
Downward sight lines from the east side of Arthur’s
Seat limit the height of buildings along the coast
between Portobello and Seafield.
237

Page 232

185
The Rest of the City
The protected views set out above in relation to
particular features can be combined to show that
some form of constraint on building height should
continue across most of the city. If the existing key
views are to remain widely visible, firm enforcement of
maximum height will be essential.
Maximum roof levels are proposed across the core
area, usually at existing heights.
In the arc of the city bounded by the hills and the
coast, view cones crisscross not far above natural
ground levels. From these arise widespread zones
where high buildings will puncture the bottom of
the skyspace. For this reason the existing policy
guidance stating that “development should conform
to the general height of buildings prevailing in the
surrounding area” remains valid with some exceptions
(see below).
Much of the northern coastal zone between
Muirhouse and Craigentinny has a larger scale due
to its past industrial activity. Nevertheless, views
down onto the water and backdrops of important
silhouettes place limitations on building height
along parts of the coast. Such restraints are needed
between Granton and Newhaven harbour to the north
and across Craigentinny down to Portobello to the
east.
In considering all the views, there are locations where
higher buildings may be acceptable. These are:
• Sighthill
• West of Granton between Birnie Rocks and
General’s Rock
• Port of Leith
Where high buildings are proposed in these areas,
it is recommended they are grouped to create an
interesting and positive form within the townscape. A
continuous wall of high buildings is not recommended
as this forms a barrier and is unlikely to be
sympathetic to its location.
238

Page 233

Introduction The Placemaking
Process
Applying
the Policy
Placemaking Action
Plan
Placemaking Guide
Adopted March 2020
239

Page 234

2
1 Introduction  3
2 The Placemaking Process 4
What is Placemaking? 4
Preparing the Development Proposal 4
Engaging with the Local Community 8
3 Applying the Policy 11
Distinctive 12
Safe & Pleasant 20
Easy to Move Around & Beyond 27
Welcoming 33
Adaptable 38
Resource Efficient 43
3 Technical Guidance 48
Householder applications 49
Masterplanning 58
Shopfronts, signage & advertising 65
Urban Infill 68
Contents
Windows & Doors 71
4 Placemaking Action Plan 76
240

Page 235

3
Placemaking has a critical part to play in the success of our
cities, towns and villages.  It is integral to the environmental,
economic and social dynamics that shape our lives and
influence our activities.
“Good placemaking can provide communities with
an important cultural context; a sense of pride and
belonging; and a sense of local and national identity.”
(Scottish Government, 2015)
Perth and Kinross has a tradition of inspiring designers.  Sir
Patrick Geddes, who is widely regarded as the founder of
modern town planning, was educated in Perth and keenly
influenced by the conditions he observed as a child.  Geddes
encouraged exploration and consideration of the “whole set of
existing conditions”, studying the “place as it stands, seeking
out how it has grown to be what it is, and recognising alike its
advantages, its difficulties and its defects”.
This document develops the placemaking criteria and gives
further guidance on how to achieve the policy requirements
provided in the Local Development Plan and provide clear
explanations as to how to achieve high quality development
that responds to the unique setting of the Perth & Kinross
Council area.
“Town-planning is not mere place-planning, nor even 
work-planning.  If it is to be successful it must be 
folk-planning.”
(Geddes, 1915)
Introduction 1
241

Page 236

4
The Placemaking Process 2
What is Placemaking?
Placemaking is the collaboration of all parties committed
to producing sustainable, well-designed places and homes
which meet people’s needs by harnessing the distinct
characteristics and strengths of each place to improve the
overall quality of life for people. Delivery of good placemaking
is dependent on the following:
● a shared vision;
● the appropriate skills;
● working together.
When assessing a potential new development, there are
many stages within the process, regardless of the size, type or
applicant.  To demonstrate that you have considered all the
issues that apply to a proposal, you need to provide evidence
that you have understood the local context and engaged with
the key stakeholders.
Preparing the Development Proposal
Identify Aims and Objectives
Whether it is an extension on a house or a strategic
development site, there are always aims and objectives for
any new development.  It is important that you establish
these from the outset through an examination of the site or
proposal.  A quick analysis of the Strengths, Weaknesses,
Opportunities and Threats (SWOT) is a valuable way of
demonstrating that you have considered the issues that are
important to this development.
Example of SWOT Analysis
Strengths Weaknesses
● Enclosed woodland
setting.
● Good potential vehicular
access.
● Established open space.
● Good footpath
connections.
● Walking distance of
centre.
● Narrow access points.
● Sloping site with levels
that have been cut and
filled.
● Adjacent to industrial
unit.
● Impact on local amenity
space.
Opportunities Threats
● South facing site.
● Attractive views out into
surrounding countryside.
● Good recreational
facilities including open
space and footpaths.
● Sloping site that could
create attractive design.
● Mixed tenure site.
● Loss of mature trees.
● Loss of habitat for
endangered species.
● Loss of open space.
● Expensive design due to
slope.
242

Page 237

5
Collate Baseline Information
For larger or more sensitive proposals, the collation of
baseline data is a crucial part of the process.  This can be
very detailed environmental data such as local habitats or
archaeology within the site but it can also be as simple as
what type of windows are used in the local street or whether
the proposal can be served by Public Waste Water Treatment
Works.  The size, type and location of the proposal will
determine the information that you will need when making an
application.
Example of a site analysis diagram
Draft Site Appraisal
An initial site appraisal can help guide your proposal and
identify the key issues.  The following areas should be looked at
as part of a site appraisal:
Site Features
● Consider existing interfaces of a site - this helps determine
the type of edge treatment that is needed, e.g. permeable,
screened or visually open.
● Consider landscape character and landscape setting such as
skylines and landmarks  as well as key views into and out of the
site.
● Existing buildings on the site.
● Watercourses, waterbodies and associated habitats within
and adjacent to the site, and site hydrology - natural drainage
pattern and water features of the site
● Natural features and habitats (e.g. trees or woodland and
type, species diverse grassland or type of coastal habitat).
● Identify any flooding/drainage issues.
● Archaeological or historic interest both in and close to the site,
including the setting of listed buildings and conservation areas.
● Local built character of the surrounding area.
Linkages
● Access into the site (larger sites will require a Transport
Appraisal or Statement).
● Access to public transport.
● Consider pedestrian/cyclist desire lines, access points &
linkages to wider routes.
● Existence of and relationship with green/blue networks.
● Power/heat supply.
This example demonstrates some of the key issues
that will need to be addressed including proximity to a
watercourse and access points into the site.
243

Page 238

6
Kenmore village has a
distinctive local character
Aerial image of site at Luncarty
Photographs and aerial mapping can visually support
your site analysis and highlight key opportunities and
constraints.
Establish Site Ownership
This can be a vital question if you are proposing to develop a large
strategic site that may have multiple owners.  Before any investment is
made in creating a vision, you should ensure that joint working has been
established so that the landowners are in agreement in terms of the
development of the site.  This is particularly significant for access and
developer contributions to community facilities.
Identify the Impact on Neighbours
Whether it be a local community group, Historic Environment Scotland
or your next door neighbours, it is vital that you communicate from the
outset about your proposal.  Ensure that you have identified all the
local residents, agencies or companies that might be affected by your
development. For larger sites, detailed guidance on the consultation
process is provided in the next section.
Illustrate a Vision
It is valuable to provide an early vision for the project.  Detail what it is
you are proposing, how you intend to deliver it and what the end result
will be.  A simple statement of your main objectives can be extremely
helpful in ensuring early consensus and as a continual reference point
during the project.  This will also be helpful for larger projects to allow the
initiation of the feasibility and budget checks.
Implementation Planning
For any proposal, you should consider from the outset how you intend
to implement your proposal.  For minor applications, this might be who
you intend to undertake work (architect, builder etc).  A trained architect,
planner or landscape architect can support your application and ensure
that you meet the requirements in terms of placemaking and design.
244

Page 239

7
Preparation Checklist:
● Identify aims and objectives through SWOT
analysis.
● Collect baseline information regarding a site.
● Examine site ownership and put in joint working
measures if applicable.
● Identify the impacts on your neighbours.
● Undertake site appraisal including: analysis of site
features, local context and linkages.
● Draft an Implementation Strategy if applicable.
● Develop a vision of your proposal.
● Consider incorporating sustainability measures
into the proposal.
Designing for the future
It is now a vital requirement for us to all to reduce carbon
emissions and improve sustainability. All applicants seeking
to undertake development in Perth & Kinross should consider 
from the outset incorporating the following measures
wherever possible in order to increase the long-term
sustainability of their development:
● Energy
● Orientation & passive design
● Surface water runoff
● Ecology
● Construction & materials
● Retrofitting Sustainable Design
Where a design statement is required as part of
a development proposal (see Policy 2 of the Local
Development Plan), developers should demonstrate how
the key sustainable design principles have been taken into
account as part of the proposal. Details of what is expected
from a Design Statement are provided in checklists in the
Applying the Policy section.
In the case of larger sites, an Implementation Strategy
forms a vital element of any Masterplan.  Any application
should describe the arrangement between the partners
involved in implementing the development.  This should
include a single point of contact for the communities
during the development stages.  The Implementation
Strategy should also address existing and potential
sources of funding, how these will be secured and likely
timescales.
245

Page 240

8
Engage with Local Action Partnerships
There are five Local Action Partnerships:
● Perth City
● Kinross-shire, Almond & Earn
● Strathearn & Strathallan
● Highland & Strathtay
● Eastern Perthshire
These Action Partnerships are made up of elected members,
communities and public services and can provide direction on
local priorities. Early engagement will identify local priorities
in terms of social needs and develop an understanding of the
potential social inequalities of the area.  Any new proposal
should respond to these local needs and provide evidence of
how they can assist in creating sustainable, successful, new
and regenerated communities.
For further information about consultation, look at the
PKC website: www.pkc.gov.uk/consultation
Community Engagement on Proposals
Identify and Engage with Key Stakeholders
Early engagement with Scottish Environment Protection
Agency, Historic Environment Scotland and Scottish Natural
Heritage will allow you time to respond to any issues that
they raise.  This may prevent your proposal being delayed
during the application process.  Issues that may involve these
government bodies should be identified through the site
appraisal process. Please check with the respective bodies for
further information on how to consult them.
Who does the proposal affect?
For any new development, it is vital that you communicate
your ideas at an early stage in the process.  In the case of
minor applications, this could be simply discussing your idea
with your neighbours before you submit an application. It
is recommended that discussion should take place prior
to submitting an application so they can visually see the
proposal. 
For more major projects, you should involve community
representatives, including the local Community Council. 
Community Planning in PKC can provide contact details for
local groups in the area.  This can assist any proposal to
allow community input from an early stage as well as ensure
collaborative working and the deliverance of better services. 
To deliver a truly great place to live, you need to identify local
needs and respond to community aspirations.
246

Page 241

9
Major developments of 50 or more homes require a Proposal
of Application Notice (PAN) before a planning application
is submitted.  This will form part of the pre-application
consultation (PAC) process to be carried out between the
developer and the community.  This ensures that communities
are made aware of and have an opportunity to comment on
certain types of proposals before a planning application is
submitted. 
It is the developer’s responsibility to undertake this
consultation although the exact format will depend on the
nature and scale of the development.  A PAC is there to help
improve the quality of planning applications.  This can help
identify  need to be submitted at the planning application
stage.
For smaller proposals, the same early engagement can
ensure that there is a reduction in the number of objections
to an application.  It is important that all parties are kept
informed about issues and requirements.
Contact Development Negotiator for PKC
In parallel with the community planning process, any large
development will need to be in close contact with the Council
regarding Developer Contributions.  This will identify more
specific needs within the local area including open space
provision, education requirements, transport infrastructure
and community facilities.  Early dialogue is beneficial as these
requirements will have a specific impact on how the proposal
can be designed and delivered.  The Local Development Plan
provides requirements for allocated sites. The Developer
Contributions and Affordable Housing SG proides further
information.
Pre-Application Consultation
Perth & Kinross Council encourages and welcomes early
discussions with applicants and developers prior to the
submission of any application. The submission of a fully
detailed and comprehensive application allows all parties
involved to achieve timely and quality decisions.
Further information on the pre-application process can be
viewed here.
247

Page 242

10
Engagement Checklist:
● Identify and engage with key stakeholders.
● Who does the proposal affect?
● Engage with Local Action Partnership.
● Contact Development Negotiator for PKC.
● Publicise the Masterplan and organise events.
Key issues to establish through the PAC:
●  Discuss proposal with PKC Planning Department
● Provide an opportunity for individuals and
communities to contribute
● The timing of public involvement and the recognition
that early involvement is likely to be more
productive. Provide contact information for project
managers and the construction team who can
respond to complaints
● Ensure the community know who to speak with if
they have any problems or questions regarding the
proposal
● Always provide evidence of how you feel the
consultation went by sending your report to the
Community Council prior to submitting it to the
Council
● Provide details of any aspects of the development
that could change or what is fixed and what is up for
debate
● Give the community a chance to contribute to details
such as landscaping and materials
248

Page 243

11
Applying the policy 2
All proposals should meet all the following placemaking criteria:
(a) Create a sense of identity by developing a coherent structure of streets, spaces,
and buildings, safely accessible from its surroundings.
(b) Consider and respect site topography and any surrounding important
landmarks, views or skylines, as well as the wider landscape character of the
area.
(c) The design and density should complement its surroundings in terms of
appearance, height, scale, massing, materials, finishes and colours.
(d) Respect an existing building line where appropriate, or establish one where
none exists.  Access, uses, and orientation of principal elevations should
reinforce the street or open space.
(e) All buildings, streets, and spaces (including green spaces) should create safe,
accessible, inclusive places for people, which are easily navigable, particularly
on foot, bicycle and public transport.
(f) Buildings and spaces should be designed with future adaptability, climate
change and resource efficiency in mind wherever possible.
(g) Existing buildings, structures and natural features that contribute to the local
townscape should be retained and sensitively integrated into proposals.
(h) Incorporate green infrastructure into new developments to promote active
travel and make connections where possible to blue and green networks.
(i) Provision of satisfactory arrangements for the storage and collection of refuse
and recyclable materials (with consideration of communal facilities for major
developments).
(j) Sustainable design and construction.
The Scottish Government identifies six
key areas to research and respond to
in the Placemaking process:
1. Distinctive
2. Safe & Pleasant
3. Easy to move around and beyond
4. Welcoming
5. Adaptable
6. Resource efficient
249

Page 244

12
Built Heritage
The towns and villages of Perth and Kinross offer us a
wealth of visual stimulus, with a huge range of architectural
styles, building uses and landscapes. A medieval core for
many settlements provides a herringbone pattern with
pends, wynds and vennels that is scaled at a very human
level, designed long before the influence of cars. The
formal approach of the Georgian period can be seen with
townhouses adhering to the classical rules of symmetry. 
In smaller villages, row housing is often present, terraces
with a mixture of sizes and forms. The late 19th and early
20th century saw the advent of villas, larger detached or
semi-detached houses that sat back off the street with
front gardens.  The latter part of the 20th century saw
considerable expansion of settlements, with development that
is less responsive to its locality and landscape.
Examples of different types of settlement pattern
Distinct streetscape in Birnam
1. DISTINCTIVE
Settlement patterns are determined by their origins, with
layers of development providing distinctive form and density. 
New development requires to be connected to these features,
acknowledging the local buildings and streets rather than
standard house types and road geometries.  A townscape
appraisal is a valuable way to analyse urban character.
In more rural locations, understanding the settlement
distribution and origins of human habitation can be assisted
through the use of historic maps and local site analysis.  When
making an early analysis of the built heritage, always check
for Listed Buildings or Conservation Areas to ensure your
design does not have an adverse impact on the local heritage
setting.
250

Page 245

13
Existing Buildings and Structures
In cases where there are existing buildings within the site,
conversion should be considered as part of the proposal.
Often these buildings or structures can provide a focus for
the development and further the sense of identity within an
area.  In cases where they are a significant landmark to the
settlement or area, the building/s should retain the outer
façade to identify their original use.  Where the buildings are
listed, these will have to be preserved and enhanced through
conversion and should be incorporated into the proposal. 
There will be a presumption against their demolition.
Perth Concert Hall has created a new focal point within the city The Museum &
Art Gallery is an A
listed building and
an iconic landmark
within Perth
Creation of New Focal Points and Landmarks
New development has the opportunity to create new
landmarks and focal points both within the site and for the
wider area.  This can be done through the design of key
buildings that demonstrate a meeting point or crossroads. 
These can be created though thinking about the long views
into a site and by establishing a hierarchy of building forms
within the streetscape.  The creation of public space within
a site can also provide a focus, reinforced through public
artwork and street furniture.
251

Page 246

14
Streetscape
A wide variety of types and styles currently characterise
and may be considered acceptable within Perth and Kinross
streetscapes.  The physical structure of a place is defined by
a network of streets and spaces.  A figure ground analysis of
the local built form can be a useful way of understanding the
pattern of building to street or space.  This helps define the
“urban grain” of an area, whether it is narrow, informal streets
or larger, regular blocks.
Vibrant streetscape in the centre of Perth
The scale of built form should be respected, ensuring that
the pattern and form of building lines, setbacks, rooflines and
elevations are harmonious with the surrounding townscape. 
Street proportions, open space and focal points should all be
scaled appropriately to their local area. Frontage, plot widths
and boundary treatments all contribute to the character of
an area, as well as the roof pitch and frontage design of the
buildings.
Coarse
Fine
Urban grain is essentially a
description of the pattern of
plots in an urban block. When
this pattern is dominated by
small plots, it is described as fine
urban grain. Redevelopment
and roadbuilding has had a huge
impact on places, creating a
coarse grain with less permability.
Services and shops that would
once have been located in walkable
distances from homes are now
in blocks to accommodate cars.
The finest urban grain is likely to
located where the greatest activity
takes place. Urban grain can be
coarser away from the centre
which reflects the less intense
demands on movement.    
252

Page 247

15
Street Furniture
Street furniture can also assist in creating a sense of place
and should be planned as part of the overall design concept. 
It should encourage human activity and not place barriers
on key pedestrian routes.  New street furniture should be
of direct benefit for its users and integrated into the overall
appearance of a new development.  The design should
be creative and reflect its locality whether a conservation
village or an urban street.  Avoid clutter on footways and
use build-outs.  There may be times when street furniture
such as textured surfaces, benches and planting can guide
pedestrians to ensure safety.
Public Art
Public art can contribute to a sense of place and create
a local identity.  They can create significant landmarks for
an area that eventually becomes synonymous with the
character of a place.  Artwork provides a context to our public
experience, demonstrating our view of the area, a reference
to the current economic or
social climate, a statement
to future generations.  The
creation of artwork by local
artists should be encouraged in
new developments, reflecting
the Council’s commitment to
innovation, local identity and
contemporary culture.  To
promote this, there may be
a requirement for a public
art percentage from new
developments in the Perth and Kinross area. 
Artwork in Birnam
celebrating connection
with Beatrix Potter
Street Lighting
Lighting can have a significant contribution to safety,
reduction in crime, creating a sense of safety and enhancing
the appearance of an area at night-time.  It can help to
create a sense of hierarchy in terms of streetscape and make
a place more navigable.  The design of street lighting can
also ensure greater footfall in the evening providing a night-
time economy for areas of mixed use.  Any lighting strategy
should be designed at the outset with careful thought to new
planting and the location of buildings.
Attractive lighting in Perth supports the night-time economy
Sculptures
celebrating Beatrix
Potter in Birnam
253

Page 248

16
Material, Colour and Details
Although the predominant, and therefore most noticeable,
traditional buildings in Perth and Kinross tend to be simple
rural houses, cottages and steadings in stone, harling and
slate, the district does contain a wealth of various building
styles reflecting the history of building development in the
area.
Materials
Local buildings were traditionally built in materials sourced
within the area and have often contributed to the unique
character of a settlement. New development should reflect
this and source high-quality, sustainable materials from
local sources whenever possible. Use of timber can provide
a high-quality, natural finish if sensitively designed.  Whilst
local materials might not always be feasible, the use of stone
detailing, individual walls or boundary treatments can assist in
the overall sense of local character. 
Timber and sheet metal blend
well within the rural landscape
Harling and timber finish provides a sense of rhythm in Muirton
Coloured fibre cement panels contrast
with the use of render and cement at
Broxden Dental Centre
254

Page 249

17
Colour uniformity in Muirton
Colour
Choice of colour can have a clear visual impact on the
surrounding area.  An individual house in the rural setting
can dominate the landscape if the choice of colour does not
fit with the local palette.  Colour can also define specific
parts of a building.  Contrasting colour on doors or windows
can create simple detail that enhances the overall design
and creates visual interest.  On a larger development, a
consistency in terms of colour can help unify a new site and
create a sense of place for residents.
Detailing
Careful consideration of finishes and
detailing can allow development to
integrate effectively into the local
context.  A key principle is to look for,
identify and use good examples of
local building characteristics which
can be found in the area and around
the site.  This can help build a new
house which is in harmony with its
neighbours and can ensure that
extensions and conversions respect
the existing building.
Examples of how the
form of a building
can determine
details such as
window openings
and roof pitches
Good detailing will not only
improve the appearance of the
house but will make it more
durable and weatherproof. 
There is considerable scope
for modern architecture and
building techniques to support
new lifestyles but an honest
contemporary approach can
be matched with local building
characteristics to provide
attractive modern living.  It
requires sensitivity and care
by the designer but will not
necessarily result in additional
expenditure.
255

Page 250

18
Scale, Height and Massing
New development should acknowledge the scale and form of
the surrounding buildings.  This can make a huge difference to
the visual impact of a development.  Whilst it is not desirable
to copy traditional buildings, it is important to harmonise
with them.  The vernacular of rural Perth and Kinross was
rectilinear, single storey structures with gabled ends or hipped
roofs.  The urban equivalent was larger but retained a similar
rhythmic pattern that provided a harmonious form.  Frontage
width versus plan depth should be addressed by looking at
the local context.
Proportion
Proportion is a fundamental element of architecture, and
relates to the building as a whole and also as sections working
harmoniously together.  Individual elements of a building
must work together to create a coherent design that balance. 
The building envelope, windows and doors, eaves and roof
ridgeline should all work in balance with each other.  Whether
symmetrical or asymmetrical, the overall composition should
be balanced and proportionate. If window openings are
too small or too close to the eaves, the building can look
out of balance.  Traditional houses maintained a balance of
proportions between walls and openings.  By responding to
the local character through the building lines, eave heights
and lintel heights, new development can relate positively to
their local surroundings whilst allowing for contemporary
design.
Extension to Dunning Primary
School compliments the traditional
building
Roofs
Modern housing can sometimes lack the balance between
plan depths to roof mass, resulting in visually dominant roofs. 
Roof massing in the context of the building envelope should
create a proportionate balance, reflecting or interpreting
the traditional form.  In developments of more than one
house, the design of the group roof forms should be carefully
considered, designing the overall visual composition and
rhythm of the roofline.  Steeper roof pitches are considered
more durable and easily maintained.  They can also can
provide useful storage or habitable accommodation within
the roof space.
256

Page 251

19
Boundary Treatments
The quality and character of boundaries between public and
private space play a significant role in the creation of legible
and attractive streets.  Boundary treatments can define an
area and are an active part of the public realm.  As such,
they require special attention in any new development’s
design.  Traditional boundary treatments such as course
rubble walls and non-coniferous hedges can help anchor any
new development to its local setting.  Maintenance for these
should be considered from the outset.
Beech hedge in Gannochy
DISTINCTIVE DESIGN STATEMENT CHECKLIST:
Major
Application
Local
Application
Householder
Application
Built Heritage
? ? ?
Streetscape
?
Materials,
Colour &
Details
Scale, Height
& Massing
Boundary
Treatments X
257

Page 252

20
Safer by Design
The front of the buildings within a street, park or open
space should create an active frontage, with windows and
doors overlooking the street.  This creates opportunities
for eyes on the street, providing a sense of safety and
welcoming appearance.  When gables face the street, these
should incorporate windows or other openings, providing
further opportunities for passive surveillance.  Building
frontages should positively address the main streets within
the development, representing their civic role within the
settlement.
Public Spaces
Centrally placed and overlooked public spaces that are
easily accessed can provide an important focal point within
a development or a settlement.  The existing public spaces
of Perth and Kinross are extremely popular both as a service
to their local community and as a focus for the wider public,
attracting visitors and tourists through a range of uses
including Highland Games and farmers’ markets.
South Inch in Perth is used for a wide range of activities all year round
2. SAFE & PLEASANT
Windows and door openings face onto open space
New public space requires to be considered from the
outset of the design process, avoiding the creation of
left over space that has little purpose or function. Open
spaces should be sited and orientated to provide sunny,
accessible areas that are sheltered from the prevailing
wind and defines the character of the area. Their siting
can provide opportunities for central points or nodes for
active travel and reen networks.  For further information,
see the Open Space SG.
258

Page 253

21
Semi-Private Spaces
Semi-private spaces, such as small front gardens, closes
and courtyards, have traditionally been defined through
the buildings and residents that live within them.  These
spaces were often to mark the transition between public
external space and private living areas.  A clear distinction
between public and semi-private should be made in any
new development, with boundary treatments that provide
an attractive and long-lasting edge that provides a sense of
enclosure.
Shared courtyard space at Cuthill Towers
Private Garden Spaces
All new houses should benefit from private garden space, for
drying clothes, accommodating pets, children’s play, quiet
enjoyment, etc.  Front gardens do not constitute private
garden space.  Private spaces require to be sized appropriate
to the property they serve, proportionate to the size and
layout of the building.  Appropriate screening with hedges,
walls or fencing may be necessary to ensure that the garden
space is not overlooked from surrounding houses or gardens. 
Private spaces must be designed so that residents have
a reasonable amount of sun/daylight.  They should not be
closely bounded by high walls or buildings.
As a rule, it is good practice to provide a minimum of 60
square metres for private space for a 1-2 bedroomed
house and 80 square metres for 3+ bedrooms.  Each
dwelling should have a minimum garden depth of 9
metres.
259

Page 254

22
Effects on neighbouring properties
It is vital when considering any new development that you
consider the privacy and amenity of neighbours. Intrusive
views into neighbouring properties can create long term
tensions that could easily prevent if the design is carefully
considering. The more closely spaced dwellings are, the
more important it is to consider the amenities of occupiers
of adjoining houses and gardens. Privacy may be infringed
through a poorly designed layout in a large housing
development or the construction of an extension which allows
direct views into a neighbouring property. New buildings must
be carefully sited to avoid undue loss of daylight or sunlight
to the habitable room windows and private garden ground of
the neighbouring property.
Key issues to consider are:
● The effect that any development has on the internal
living space of neighbouring residential properties.
● The impact that overshadowing has on              
neighbouring properties includng garden ground.
● The privacy of adjacent properties both internall         
and within the garden.
● Access to any new development and who this might
effect in neighbouring properties.
Example of backland development which is generally not
supported. The amenity of neighbouring properties would be
impacted by the new dwelling and additional driveway.
Example sketch of shadow analysis
260

Page 255

23
Greenspace
Any development should recognise the wider recreational
and link with the wider recreational and access value
of greenspace and green networks.  Understanding the
wider footpath network and open space provision of
a settlement helps to identify the local needs and how
any new development can create better connections to
greenspace.  This reaffirms the identity of a place, making
it a more attractive place to live.  It creates an environment
which supports healthy lifestyles and encourages outdoor
recreational activities that can improve physical and mental
wellbeing.  When creating new open space provision, the
design should consider how to create attractive linkages into
the wider green network through pedestrian/cycle access.
For further information see the Open Space Provision for New
Developments SG.
MacRosty Park provides excellent access into the wider footpath
around Crieff
Shelter Belts
In sites where there are conflicting winds, appropriate shelter
should be created through planting and the design of the
street pattern.  Sites with existing trees or woodland adjacent
can provide further opportunities for shelter but excessive
shading should be avoided as it prevents solar gain.
Tree Survey and Retention of Existing Trees
The natural landscape features within a site should be well
designed and enhance the local character of the settlement. 
Woodland and trees can form an attractive visual backdrop to
buildings, framing development and enhancing opportunities
for local biodiversity.  Healthy woodlands can also play a part
in managing flood risk. Existing trees and hedgerows should
be assessed through a professionally accredited tree survey.
These features should be retained whenever possible.
Example of Tree Survey
261

Page 256

24
Designing Out Air Pollution
Good quality air is an important part of human health.  It is
vital that we recognise this in the development process and
design out exacerbating factors to support the reduction in
air pollution.  Many strategies are interlinked with other key
placemaking requirement.  For instance, providing sustainable
forms of travel, alternative heat and energy sources and new
planting can all contribute to quality design.  Furthermore,
the internal design of a building can contribute to cleaner air. 
New development should therefore ensure the following:
●  The Air Quality Management Area measures at Crieff
High Street and Perth should not be contravened.  Any
proposals will require to demonstrate that they do not
elevate pollution levels in these areas.
●   Buildings and street layouts should be designed to allow
for the dispersal of pollutants and should prevent areas
of concentrated pollution sometimes known as street
canyons.
●   Orientation of buildings and room positions should be
designed to reduce exposure to polluting factors such as
busy roads.
●   Use sustainable design construction methods to prevent
any exacerbation of pollution.
●  Create linkages between sustainable forms of travel,
providing more opportunities to make journeys without a
car.
●  Air pollution can be designed out by seperating open
space, and pedestrian or active travel routes away from
areas of traffic.
Cycle storage at Invergowrie Primary School
262

Page 257

25
●  Planting in and around SuDS solutions can enhance the
habitat for wildlife including aquatic birds, invertebrates,
amphibians and reptiles. Consideration of how amphibians
in particular will migrate through a site should be
incorporated into design and through the use of wildlife
kerbs or underpasses.
●   In terms of handling water, designs should promote
the use of porous surfaces in order to minimise run-off,
particularly during periods of intensive rain.  The following
table provides a list of posisble approaches.
Attractive example of SUDS at North Inch Community Campus which
enhances the local biodiversity
Drainage and SUDS Requirements
As well as locating inappropriate development away from
areas at risk from flooding the Council will seek to ensure
that new development does not contribute to flooding and
increased surface water run-off.  This shall be considered
through the preparation of a Drainage Impact Assessment
The proposal will need to conserve any existing water bodies
within the site and address how they could be incorporated
into the design of development.  In addition, any potential
flooding issues should be established early on in the process
and highlight whether there is a need for a flood risk
assessment and/or a drainage impact assessment.  See the
Council’s Flooding Supplementary Guidance for more details. 
Where drainage is required, SuDS (sustainable drainage
systems) are in place to reduce the total amount, flow and
rate of surface water run-off as well as providing treatment
before discharging into a storm sewer or watercourse. Besides
water management, SuDS should also deliver multiple benefits
for amenity and biodiversity. The Open Space Supplementary
Guidance includes detailed advice on SuDS. Any design should
take account of any flood risk assessment findings.
There are a range of options available:
●   The ownership and responsibility for maintenance of each
SuDS element is clear and long term management is in
place.
●   SuDS are designed to match the site context and respond
to factors such as run-off rates, ground conditions and
topography, as well as the size, type and density of the
development.
SuDS in North Inch designed as a water feature and
riparian habitat within the park
263

Page 258

26
Pervious pavements Materials that reduce flow by allowing
water to infiltrate into subsoils or
underground reservoirs
Infiltration Trenches Stone filled trenches that temporarily
store stormwater run-off to allow
exfiltration into surrounding soil.
Filter Trenches and
Strips
Shallow stone-filled trenches or
vegetated strips to minimise run-off
Swales Vegetated channels leading to further
treatment, particularly effective
alongside roads or pathways.
Basins Vegetated depressions used for
temporary storage or run-off, reducing
peak flows.
Ponds & Wetlands More environmentally beneficial and
attractive alternatives to basins,
providing both storage and treatment.
Rain Gardens Domestic scale solutions such as
planters and planted areas in gardens
to attenuate and treat run-off
Green Roofs & Walls Planted surfaces that can store and
filter run-off, and provide wildlife,
aesthetic and cooling benefits.
Rain Water Harvesting Collection of rainwater for use
in a building or garden, reducing
consumption and storm water flows.
SAFE & PLEASANT DESIGN STATEMENT CHECKLIST:
Major
Application
Local
Application
Householder
Application
Safer by
Design ?
Neighbours
Greenspace
? X
Shelter
?
Air pollution
? X
SUDS
? X
264

Page 259

27
Movement & Streets
Human settlements have always been focused in areas
that could access food and water.  Longer distance routes
have therefore been a vital part of the economic growth of
Perth and Kinross, from drover’s tracks to military roads, and
the success of settlements has relied heavily on access to
resources.  This is still crucial and presently promoted through
the focus of development within the tiered settlements of
Perth and Kinross (LDP2, page 15).  Proximity to existing
transport networks, utilities and community infrastructure
should all be considered when siting and designing
development.
The layout of access roads should respond to landscape views
by creating vistas. It should aim to create a distinct and legible
non-labyrinthic pattern that helps orientation by providing
foci and visual and spatial continuity, including larger scale
continuous connections across a site and beyond. The layout
should be based on a clear hierarchy of roads that differ in
their function, length or continuity and spatial arrangement
across its width.
Traffic calming through these labyrinthic, short range visibility
patterns should not become the defining factor of the street
layout of a new development as it can result in non-legible
townscapes where there is no larger scale continuity and it is
hard for people to orientate. It can also remove the benefit of
vistas into the landscape which contribute to the amenity,
distinctiveness, a sense of place and a sense of orientation
(such as in Crieff High street looking towards the Highland
Boundary Fault or in Edinburgh New Town looking towards
the Firth of Forth). Rather, it should be achieved with other
measures such as alternate planting or car-parking.
Map demonstrating road hierarchy
3. EASY TO MOVE AROUND & BEYOND
265

Page 260

28
Pedestrian route in Muirton
When designing a new development, it is important to
consider buildings and spaces before creating the road
network.  Streets should be shaped by the activities that
take place within them, promoting interaction, ease of
movement and the role that they play within civic life. 
Design should therefore respond to the following:
● Site features such as topography and views into the
wider landscape.
● Orientation (easy to move around) and overall
legibility of the geography of the development
(the layout needs to have a strong and memorable
rationale).
● Hierarchy of streets and street typologies (these can
be shown in profile in their spatial arrangements
and function).
● Relationship between buildings to the streetscape.
● Streetscene and spaces between buildings.
Street design hierarchy
Street structure
Pedestrians and cyclists
Connections to wider networks
Connections within a place
Block structure
Walkable neighbourhoods
Public transport
Context and character
Orientation
Street layout
Achieving appropriate traffic speed
Junction types and arrangements
Streets for people
Integrating parking
Emergency and
service vehicles
Street detail
Drainage
Utilities
Planting
Materials
Reducing
clutter
Street design hierarchy diagram taken from Desiging Streets
266

Page 261

29
Cycle Routes and Cycle Friendly Infrastructure
Cycle routes and infrastructure must be considered as part
of any new development.  Access to safe and direct routes for
cyclists can reduce car usage significantly, so providing links
to the existing cycle network can help to create attractive new
places.  The following are considerations for any new cycle
infrastructure:
● Create safe routes that provide consistency and allow for
a wide range of users.
● Identify the most logical route for cyclists, allowing
navigable and accessible destinations.
● As with pedestrian routes, identify key desire lines that
minimise detours and delays.
● Create surfaces that are smooth and well-maintained
with gentle gradients.
● Create attractive new routes that make cycling an
attractive option by allowing seperation from cars.
Public Transport Modes
Access to public transport should be considered from the
outset and is linked directly to the street hierarchy that is
designed in larger developments.  It is important that new
developments can accommodate public transport routes and
discussions with local public transport operators should be
initiated during the identification of key stakeholders.  A swept
path analysis can help to determine whether streets can
accommodate larger vehicles.
Provision for bus stops and access to railway stations can
significantly reduce car usage.  Creating active travel nodes
that are linked to public transport supports an integrative
approach to travel. Providing a realistic alternative for people
within the new development will, however, depend on the size
and density in terms of service levels as well as the locality
of the site.  Sites that are located near good public transport
links are far more desirable than those that have little or no
provision.
The siting of public transport stops and the relationship that
this has to key pedestrian desire lines should be identified
and exploited.  Locating bus stops near junctions creates
greater access to them.  Ensuring that they are overlooked
and are of quality design will make them more attractive
to use.  Creating streetscape features and landmark
buildings can allow users to use bus stops more confidently,
creating identifiable places that act as nodes within the new
development.
Berth Park SuDS pond and cycle route (Springfield)
267

Page 262

30
Access and Paths
“Desire lines” are the most likely routes people will walk from
one place to another.  Identifying the routes that people are
most likely to take through the site informs its design and
ensures the integration of any new routes into an existing
settlement.  New development should also create permeable
places where development relates to the surrounding routes. 
It is desirable where possible to provide more than one
through route into a new site as this provides a number of
opportunities for people travelling into the development as
well as through it.
The footpath network should be analysed to establish the
hierarchy of existing streets.  This will assist in creating the
most permeable design, merging the new site into the existing
network of footpaths.  Sites work best if they provide a range
of choices,  The access network is extensive throughout Perth
and Kinross, and provides an invaluable recreational facility
for residents and tourists.  It is essential that existing access
is preserved and enhanced through new development and
is particularly integral to edge of settlement developments. 
Rights of access are a material consideration of planning
applications.  The Core Path Plan details existing rights of way
within the area.
Further information on creating safer walking, cycling and
wheeling routes for everyday journeys can be found on the
Sustrans Scotland website.
Path in Birnam accessing local park
268

Page 263

31
Green/Blue Network Connections
Green and Blue Infrastructure is a network of strategies that
assist development, providing “ingredients” for solving urban
and climatic challenges by building with nature.  The main
components of this approach include flood management,
climate adaptation, less heat stress, more biodiversity, food
production, better air quality, sustainable energy production,
clean water and healthy soils, as well as increased quality of
life through recreation and providing shade and shelter in and
around villages and towns.  Green and blue infrastructure
also serve to provide an ecological framework for social,
economic and environmental health of the surroundings.  A
multifuntional blue/green network can form a structural
backbone and an attractive framework for new development. 
The Council’s Green Infrastructure Supplementary Guidance
provides a guide on incorporating green infrastructure within
a development and should be used when designing a new
development.
Existing and new watercourses or water bodies, including
SuDS, as a basis for a green corridor, can provide recreational
and wildlife resource. Buffers and appropriate planting can
provide for wildlife shelter and movement, with paths kept to
one side. The opportunity to restore the water environment
should also be considered, where appropriate, through the
development process. Planting in and around SuDS solutions
can enhance the habitat for wildlife including aquatic birds,
invertebrates, amphibians and reptiles. SuDS should be
carefully considered as it is a legal requirement to integrate it
in at the earliest stage of the design. The Council’s Flood Risk
Supplementary Guidance provides further advice on this.
Amphibian wildlife curbHabitat Connections
Any new development should reinforce the local and wider
habitat network, supporting habitat enhancement and
preventing the fragmentation of wildlife.  This can be done
through the identification of key linkages between sites and
the development of new routes.  Animals, just like humans,
develop desire lines over generations which, when altered,
can have a detrimental effect on the wider habitat.  These
should be identified early on in the designing of a site to
ensure that key routes are retained whenever possible or
compensated for.
Any proposal should show how habitat connections
and wildlife corridors within and through the site will be
maintained, enhanced and created. Consideration of how
amphibians in particular will migrate through a site should be
incorporated into design and through the use of wildlife kerbs
or underpasses.
Amphibian wildlife curb
269

Page 264

32
Sustainably designed urban development can restore some
of our diminishing urban wildlife resources. An evaluation of
the suitability of the new site and existing species in the area
can inform the provision of an enriched environment through
measures such as:
●  Incorporation of wildflower areas and pollinator corridors
●  Integrated bat roosts in new buildings
●  Integrated swift nesting bricks in new buildings
●  Facilitation of hedgehog commuting through gardens
EASY TO MOVE AROUND AND BEYOND DESIGN
STATEMENT CHECKLIST:
Major
Application
Local
Application
Householder
Application
Movement &
Streets ?
?
? X
Cycle Routes
? X
Public
Transport ? X
Access & Paths
?
Green/Blue
Infrastructure X
Habitat
Connections ?
Muirton wild flower meadow
270

Page 265

33
Landscape Impact
Perth and Kinross is an area with a number of distinct
landscape characters, from the lowland river corridors to the
highland moorland and plateaus. These features are integral
to the shaping of the historic settlements, the traditional
industries and the styles of buildings. Placemaking plays a
major role in maintaining but also developing these unique
characteristics, ensuring that we conserve and evolve our
communities for future generations. For further infomration
on landscapes, please refer to the Landscape SG.
Before proposing any site for development, it is vital
to research the designations within that area and
check the LDP policy.
National and local designations:
●  There are four National Scenic Areas located within
the Perth and Kinross region: Loch Rannoch & Glen
Lyon, Loch Tummel, the River Tay and the River Earn.
●  Special Landscape Areas, a regional designation, are
spread across the Perth and Kinross area covering
about 27% of the land.
●  There are 42 gardens and designed landscapes that
influence the design of any new development.
●  There are 6 Wild Land Areas in Perth & Kinross.
4. WELCOMING
271

Page 266

34
Orientation of Development
The landform of an area informs the land cover, land uses,
the microclimate and human activity.  It inter-relates with
waterways and this in turn is interconnected with the siting
and shaping of settlements.  Any development must consider
the wider landform and the hydrology patterns which inform
the site.  It should also respond to the relationship existing
development has to the landform and topography and which
elements of the landscape informs important parts of a
settlement’s setting.
Views and Skylines
Wider views are largely determined by the landform of an
area.  Highlands, river valleys, woodland and open agricultural
land can create enclosure and exposure, influencing how
a settlement fits into the landscape.  Long, medium and
short views into any development require to be analysed,
identifying where buildings and viewpoints will be affected. 
Roads, cycle lanes and footpaths around the site should be
assessed, as this will be the first impression someone will
have of the development.  Using mapping, photographs and
illustrations, new developments must provide evidence that
the visual impact of the development has been acknowledged.
Ridgelines
New development should not dominate ridgelines and
should accommodate appropriate setbacks or planting to
prevent conspicuous breaks in the horizon.  Trees can provide
a backdrop reducing the impact of the built form on the
settlement.
View of Invergowrie Primary School from the core path
New houses in the Ochil Hills sit within the landform
272

Page 267

35
Key Points
Any design of a new site should identify areas where
new development will be visible from (often called visual
receptors).  It should provide an understanding of the
affect that the new development will have on these views
and whether the site can visually fit into the surrounding
landscape in the context of these viewpoints.
Analysis of key views into the site
Slopes
Any sites located on slopes should use
the existing landform to create the
design rather than creating platforms
through the cutting and filling of land. 
The challenge of this can encourage
more creative responses to a site design
and allow for a distinctive quality that
works with the contours rather than
challenging them. Extensive alteration of
the topography can also result in damage
and loss of existing trees and other
existing features of value and character.
Different approaches to
designing buildings on a slope
Challenging site topography is often
perceived as a constraint but can
actually create an opportunity for
innovative design proposals that
work with the unique form of the site. 
Build with the slope, be creative with
garden space or consider different
housing types.  Retain valuable
site features that can provide new
landmarks and an individual sense of
place, presenting opportunities for
planting and open space.
273

Page 268

36
Planting and Landscaping Requirements
Planting and trees are important contributors to placemaking.
New planting should reflect the local patterns of vegetation
within an area, using it to define private and public spaces,
creating a more attractive streetscape and assisting in
the existing biodiversity networks.  Appropriate types of
vegetation should be considered that will define the character
of the area and allow local flora and fauna to flourish.
Planting choices should as far as possible reflect, and be
sourced from, the surrounding local native habitat. Large
mature trees, ancient woodland and riparian woodland,
provide the greatest biodiversity value and should be
incorporated into the design.
Native planting is preferred, although other flowering and
fruiting varieties can enhance the mix. These provide a wildlife
resource and enhance the setting through changing colours
and textures. Other suggestions include:
●  planting community orchards, or fruit trees in gardens to    
create a virtual orchard
●  including a mix of hedging varieties
●  providing larger growing native trees in larger open spaces
The Open Space SG provides more guidance regarding
planting.
Planting can add colour and interest to an area as well as providing vital habitats
274

Page 269

37
Edge of Settlement
As towns and villages expand, the edge of settlements is often
the siting of new developments.  These can be prominent
sites in terms of visibility, often the point of entrance into a
settlement and the transition between countryside and town. 
This edge requires careful consideration, incorporating the
possibility of longer term growth with shorter term visual
impact.  An overall visual composition of the settlement
boundary including buildings, rooflines, boundary treatments
and structural landscaping should all be assessed to create
a positive edge to the settlement and the surrounding
countryside.  A landscape framework such as a tree belt or
an attractive open edge with appropriate planting should
be an integral part of the design. Native trees, landscaping
and hedges should be used in settlement edges as this will
help integrate the settlement edge into the surrounding rural
landscape and support habitat connectivity. New development on the edge of Rait
WELCOMING DESIGN STATEMENT CHECKLIST:
Major
Application
Local
Application
Householder
Application
Landscape
Impact ?
Orientation
of
Development
Planting &
Landscaping X
Harsh edge to settlement with no landscaping
Village entrance responsive to landscape and local character
275

Page 270

38
Density
The design of a development should create a strong sense
of local identity that complements its surrounding area.  New
development should form pleasant, walkable neighbourhoods
that support local facilities and reduce the need for cars.  The
settlements of Perth and Kinross have traditionally evolved
over time with a mixture of uses located within close proximity
to allow the community to access a range of services.
In recent years, new development has been focused on
detached or semi-detached housing, often located on
the edge of settlements and at a medium to low density. 
Sometimes, this has resulted in new development having
little variation and being difficult to navigate.  The creation of
higher density around new nodes or focal points can not only
provide a strong sense of place but also sustain any new local
services.  Creating new neighbourhoods through a range of
densities, built form and layout can allow for a local sense of
identity.  This requires careful consideration of house types,
building groups and proportionate spaces between buildings.
Methodology for establishing site capacity
The Local Development Plan has calculated capacity ranges
for each allocated site. The methodology involves identifying
the developable area of each site based on physical
constraints and developer requirements such as open space
and infrastructure needs. A baseline of 80% was assumed
for each site initially with 20% retained for landscaping. The
developable area percentage was then amended further
depending on the individual site characteristics and any
known or suspected constraints.
5. ADAPTABLE
The percentage of developable area identified for a site was
then used to calculate the capacity. Three ranges of density
were used in this calculation:
●  High density from 26 to 40 units
●  Medium density from 16 to 25 units
●  Low density up to 15 units
Density ranges were chosen based on the context of the site,
the surrounding urban grain and the impact that the site has
on local infrastructure. The capacity of windfall sites should
be calculated using the same methodology.
Proposals outwith identified capacity ranges
If a planning application proposes a density that falls out
with the capacity range for a site in the Local Development
Plan, the applicant should demonstrate that the following
questions have been answered:
●  Does the design provide the necessary open space
requirements as defined by the planning authority?
●  Has the design met the required landscaping and
biodiversity requirements?
●  Do the additional units create concerns on the capacity of
the local road network and/or impact on other relevant
local area transport matters?
●  Can the local community facilities absorb the number of
inhabitants?
276

Page 271

39
Parking Arrangements
The integration of parking should be designed to reduce the
visual impact of large numbers of cars and provide flexibility.
Extensive areas of car-park should be avoided near areas
where people live. If car-parks cannot be avoided the design
should consider the car-park’s appearance and potential
for shared use as public space when it is not in use. Planting
can help create an adaptable area and provide habitat
opportunities.
On-Street Parking
This can support the reduction of traffic speeds and allow
for both residential and visitor car parking.  Informal
arrangements rather than rigid standards should be explored
and an analysis of the positive and negative affects should be
undertaken before decisions are made as to the numbers it
can accommodate.
Off-Street Parking
Off-street parking will often be required to accommodate
residential parking.  Parking provided within the plot should
not dominate the front gardens of houses.  Courtyards or
side parking can provide useful alternatives to this approach. 
Good natural surveillance should be integrated into any
courtyard design.
Parking for Disabled People
Parking bays should be designed so that drivers and
passengers can access the car easily.  Consider the width and
the use of dropped kerbs to allow for easy access to footways.
Parking is seperated from housing at Cuthill Towers
●  Is there capacity in the local primary school to cope with
this development?
●  Does the applicant provide the required percentage of
affordable housing?
●  Does the design provide a high level of residential amenity?
●  If private garden grounds are provided, do they meet
the minimum requirements as defined by the planning
authority?
277

Page 272

40
Mix of Uses
A mix of uses within new development can help create
more sustainable communities, providing opportunities for
facilities and services that can serve the wider community. 
Traditionally, settlements have had a mix of housing, industry
and shops all within walking distance, allowing for people
to live and work within their local community.  Although the
invention of the car has allowed us to travel greater distances
to access employment and services, the principle of providing
a community with a range of opportunities that creates safer,
inclusive places will ultimately create a more sustainable
environment.  This mix of uses could be housing, shops,
community facilities, open spaces or employment, producing
potential focal points around which residential development
can be concentrated.
Mixed Tenure
A mixture of housing can further assist in a local sense of
community and social cohesion, which allows for owner-
occupiers, rented and shared ownership.  A variety of
tenure that is visually integrated into new development and
distributed evenly across the community allows for greater
inclusivity. “Pepper-potting” or more structured “clustering”
of social housing is considered to improve social mobility and
prevent the segregation of different socio-economic groups.
Mix of uses in the restored Stanley Mill including residential and
workshops (image courtesy of Historic Environment Scotland)
Mix of tenure in Muirton
278

Page 273

41
Affordable Housing
There is a range of affordable housing that can be provided
within a development.  Scottish Planning Policy defines
affordable housing as “housing of a reasonable quality that is
affordable to people on modest incomes... affordable housing
may be in the form of social rented accommodation, mid-
market rented accommodation, shared ownership, shared
equity, discounted low-cost housing for sale including plots
for self-build, and low-cost housing without subsidy”.  The
following types are recognised as affordable:
●  “Affordable Rent” can be social rented accommodation
from a Council or a housing association at an affordable
rent or mid-market rented accommodation which is
slightly higher than social rents but lower than private
rent.
●  “Low cost ownership” can be housing where a household
buys a share of a house at 25%, 50% or 75% and pays
an occupancy charge for the remaining share of the
property or shared equity where the buyer purchases
60-90% of a property and the remaining portion of held
by the Scottish Government with no occupancy charge.
Any new development with an affordable housing
requirement should offer a range of suitable housing that will
assist the local area. 
Community Facilities
New development can have a significant impact on
community facilities.  In order to ensure sustainable
communities, proposals should research local needs and
identify whether the proposal can work closely with the
infrastructure capacity process but can also help support
existing resources such as community halls, local toilets, car
parking and sports facilities.  These types of issues can be
identified through close communication with the Community
Planning Partnership groups.
Broxden Dental Centre provides the local
community with dental care as well as an
important training centre for dental students
279

Page 274

42
ADAPTABLE DESIGN STATEMENT CHECKLIST:
Major
Application
Local
Application
Householder
Application
Streets
X
Parking
?
Mix of Uses
? X
Mixed Tenure
X
Community
Facilities ? X
Access for All
?
Access for All
To create a truly sustainable community, places should be
adaptable and able to provide for lifetime neighbourhoods. 
The location, design and layout of any new development
should be considered in terms of adaptability and longevity. 
New development should provide places that support
independent living for all, from the design of the streets to the
adaptability of buildings.  For larger developments, a range
of homes should be provided with services and facilities easily
accessible to ensure social inclusion.  Travelroutes and the
supporting infrastructure should be considered carefully in
order to cater to a wide range of users, and the co-location of
key services such as healthcare and social care facilities can
allow for ease of access.
280

Page 275

43
Energy Efficiency
New development should reduce reliance on fossil fuels
through the use of alternative sustainable forms of energy
production including energy storage solutions where feasible.
●  Energy efficiency measures have been considered in
order to achieve energy savings in new development or
retrofit to existing development
Energy efficiency measures can include wall insulation, cavity
insulation, solid wall insulation, loft insulation, floor insulation,
double and triple glazing, water tank and pipe insulation and
draft proofing
●  Technologies that can be used to provide heat and electricity
to a building, emitting low or no net CO2 emissions, have
been considered and incorporated in the proposal where
possible.
6. RESOURCE EFFICIENT
These can include, solar hot water, air and ground source heat
pumps, micro wind turbines, solar photovoltaic (PV), biomass
heating, Combined Heat and Power (CHP), efficient gas boiler
and efficient appliances and communal or district heating
The Council’s Environmental Health and Development
Management teams should be consulted at the earliest
possible opportunity in order to fully consider any potential
impacts when selecting renewable and low carbon energy
options. Supplementary Guidance on Renewable and Low
Carbon Energy providing further infomration is expected to be
published later this year.
Heat pump at Mains of Mawcarse
Biomass plant at Crook of Devon
281

Page 276

44
The microclimate of a development can assist in the
usage of both inside and outside space and provide
natural energy sources in terms of lighting and heating. 
A response to this microclimate is therefore integral
to creating sustainable development that works in the
long-term.  Working with the existing landform, streets
should be aligned against the prevailing wind direction to
avoid wind tunnels.  Furthermore, buildings should have
a southerly aspect for private spaces and living room,
taking advantage of the maximum hours of daylight.
Passive Design
The principles of sustainability should be incorporated in the
design, layout and orientation of new neighbourhoods, streets
as well as individual dwellings.
●  The layout of streets and/or the siting of building(s)
maximise opportunities for solar heat gain, natural
ventilation and daylighting throughout the year
●  Street widths and building placement ensures that there
is good daylight exposure to building frontages and
key public spaces - wider east-west streets will expose
south-facing buildings, allowing for good day lighting and
natural heating
Skylights, light monitors, clerestories, light shelves, light tubes,
atria, courtyards, and glass or glass-block partitions and
doors all contribute to increasing natural light in buildings.
Technologies that can be used to provide heat and electricity
to a building, emitting low or no net CO2 emissions, have been
considered and incorporated in the proposal where possible.
●  Landscaping and planting is designed to reduce exposure
to wind, provide shading and mitigate against the `urban
heat island` effect
Deciduous trees can be planted near buildings to provide
shade in the summer, whilst allowing heat and light through in
the winter. ‘Wind cowls’ can be placed on the roof of buildings
which respond to breezes and circulate air through the building.
Example of a sun path analysis
282

Page 277

45
Construction & Materials
New development should maximize the use of materials from
sustainable resources and the use of sustainable construction
methods. Materials to be used in construction projects are
responsibly sourced and are sourced from local suppliers
wherever possible. The Council will also encourage the use of
recycled materials on site. The proposal should minimise the
impact (e.g. noise and air pollution) of construction activities
on its neighbours.
Existing and new watercourses or water bodies, including
SUDS, as a basis for a green corridor, can provide recreational
and wildlife resource. Buffers and appropriate planting can
provide for wildlife shelter and movement, with paths kept to
one side.
Construction waste is limited as much as possible in order
to reduce environmental impact and also save on significant
costs of landfill.
The production of a Site Waste Management Plan (SWMP)
for a proposal can help reduce the amount of waste produced
during the construction phase and manage site waste more
efficiently. More information can be found here.
The issues outlined above should be considered within a
‘construction management plan’ which will generally be
covered by planning condition for major developments.
Retrofitting Sustainable Design
New build development represents approximately 1% of the
total housing stock each year, highlighting the importance of
addressing the sustainability of the existing housing stock.
There are a number of technologies that can contribute to
the reduction of carbon emissions from the existing housing
stock. These technologies are generally focused around
energy efficiency in premises through increasing the thermal
efficiency of a building so that less energy is required.
Improving efficiency is a combination of improving insulation
and using the most efficient way of producing heat and
energy. Measures such as cavity wall insulation, micro
Combined Heat and Power (CHP), solid wall insulation and
air/ground source heat pumps have the potential to achieve
large carbon savings and some funding streams are available
for such initiatives. Despite a high up-front cost there are
long term economic benefits for the property owner through
energy cost savings.
On-site waste can be minimised by:
• Design that utilises whole units of construction
materials
• Appropriate storage of materials on site - minimises
loss of re-usable material
• Separate out waste materials at source to aid re-use
on site or recycling
• Wood or natural materials can be utilised for
composting and/or biofuel energy generation
283

Page 278

46
Previously Developed Land
Developments located on brownfield sites can contribute
to sustainability as they make the most efficient use of
previously developed land. Retaining existing buildings
can be more sustainable than demolishing and rebuilding,
which has associated embedded carbon emissions. Further,
sustainable design and construction lends itself easily to
refurbishment schemes, offering cost effective opportunities
for development.
Previously developed land also tends to be well served
by an existing sustainable transport and utilities network,
reducing the need to redirect services and the energy needed
to do this. Contamination, however, is a key consideration
when developing on brownfield land and sites must be fully
assessed for potential contaminants prior to development.
Historic Environment
Approximately 19% of Scotland’s housing stock was built
before 1919, long before Carbon Emissions Reduction Targets,
Building Regulations and Energy Performance Certificates
were enacted. It is therefore important to consider the energy
efficiency of historic buildings to discover possibilities to
reduce their carbon footprint. At the same time it is important
to consider the conservation and preservation of the
character and appearance of historic buildings.
Historic Environment Scotland have recognised the
importance of improving the efficiency of Scotland’s historic
building stock and provided guidance on the subject.
Redevelopment of a brownfield site in Stanley
Steading conversion at Cuthill Towers
uses the original buildings
284

Page 279

47
Innovative design at Wolfhill with green roofs
Recycling Facilities and Initiatives
It is vital to minimise the waste produced from a development
once the buildings are lived in. In terms of water usage,
harvesting rainwater using run-off from roofs can provide
an alternative source for grey water or irrigation.  On-site
composting and recycling should be provided if possible
and any storage needs for recycling should be designed
sufficiently to provide good access for collection.  These issues
need to be integrated into any design scheme at an early
stage.
RESOURCE EFFICIENT DESIGN STATEMENT
CHECKLIST:
Major
Application
Local
Application
Householder
Application
Energy
Efficiency ?
Passive Design
?
Constrcution &
Materials ?
Retrofitting
Sustainable
Design ? ? X
Recycling
Facilities ? X
285

Page 280

48
The following is guidance on how to approach specific
types of planning applications in relation to placemaking
principles. These can be treated as part of the Placemaking
Supplementary Guidance but also as standalone documents
that will be updated as and when required. The guidance
covers the following application types:
●  Householder Applications
●  Masterplanning
●  Shopfronts & Advertisements
●  Urban Infill
●  Windows & Doors in Listed Buildings & Conservation Areas
Any issues regarding Housing in the Countryside are dealt
with in the Supplementary Guidance produced seperately.
Technical Guidance on Placemaking 5
286

Page 281

49
Householder Applications                                               
An extension to a building can be conceived to either
appear as an integral part of the original architecture or,
alternatively, it may be of a contemporary or contrasting
design. In the former, an extension may go unnoticed. In the
latter case the extension would purposefully be different yet
aim to be equally compatible and complementary. It is not
often appreciated that the best extensions are architecturally
attractive in their own right. Both approaches require
particular skill and the Council recommends that you seek
professional advice from someone trained and experienced in
designing buildings. A well designed extension can enhance a
property.
Permitted Development
Certain types of development can be carried
out without planning permission. This is known
as permitted development, and covers a wide
range of minor  developments. While there may
be instances where planning permission is not
required, the following Council guidelines are best
practice and should be considered in the context
of any proposal. You can find more out about
permitted development rights here.
Effects on Neighbouring Property
Extensions can intrude, to a greater or lesser extent, on
the privacy and amenity of neighbours. The more closely
spaced dwellings are, the more important it is to consider
the amenities of occupiers of adjoining houses and gardens.
Privacy may be infringed through the construction of an
extension which allows direct views into a neighbouring
property or a secluded garden.
Extensions must be carefully sited to avoid undue loss
of daylight or sunlight to the habitable room windows
and private garden ground of the neighbouring property
(particularly when affected garden is small); the appearance
and orientation of the extension must be considered from the
neighbour’s house or garden.
An extension built directly along a boundary line may
be acceptable with the agreement of the neighbouring
property but you need to think about long term access and
maintenance. There may be an opportunity for neighbours to
share a party wall and consequent drainage arrangements
for their mutual benefit.
287

Page 282

50
Mutual boundary
Mutual boundary
Overshadowing
Examples of 45o rule
Shaded area represents
reasonable build zone in
many circumstances Shaded area represents
reasonable build zone in
many circumstances
A single storey rear extension of 4m depth, from the
original building’s rear wall, would in many circumstances
be acceptable; even if directly on a property boundary.
Thereafter the extension would have to step back from the
boundary at an angle of 45 degrees from a point 4m from the
original back wall of the property.
Some relaxation of these standards may be considered where
the extension is to the north of an affected neighbour or not
impacting on a neighbouring habitable room window.
288

Page 283

51
Daylight
The climate of northern Britain relies heavily on diffuse
sun light as the principal source of daylight. The availability
of natural light can be anticipated by the resultant block
form of a building, its topography, aspect and relationship
to surroundings. Any proposed extension should maintain
and allow for a reasonable level of natural daylight to
internal living space of a neighbouring residential property.
Established practice determines that 25° is a suitable
maximum obstruction path which should be afforded directly
to a front or rear aspect. Beyond this point, windows to living
spaces may become adversely affected through relative
shadow paths.
Example of 25% rule
Proposed
development
Existing
building
Overlooking
● Windows should be located to avoid, or otherwise
minimise, overlooking adjoining houses and private
gardens.
● Overlooking may in certain occasions be resolved
through the use of rooflights or boundary screening as
appropriate.
● Balconies above ground floor level, roof gardens,
decking and raised patios will generally be resisted
where they diminish the privacy of neighbouring
houses and gardens or raise safety concerns.
● Windows of habitable rooms should generally be
a minimum of 9m from rear boundaries which they
overlook unless adequate and appropriate screening is
utilised.
25%
Window
midpoint
289

Page 284

52
Scale, Shape and Form
Extensions should respect the shape, scale and proportions of
the existing building and relate to the roof pitch and original
building depth.
● In most cases an extension should be a subordinate
addition in all respects.
● New roof ridges should not normally exceed the height
of the original. A new ridge line which is set lower than
that of the original will generally be more acceptable.
● Extensions should seek to achieve a building depth
which respects traditional building forms and avoids
dependence on artificial lighting and ventilation.
Detailing
Detailing is key to the successful integration of designs for
extensions. Extensions to older properties may benefit from
matching stone coursing and mortar specification. Details
can determine the character of a building; over-elaborate
detailing on an extension where the original architectural
style is of a seamless and modest appearance would be
inappropriate. Details such as lintels, sills, eaves and verges
have to be carefully considered to help integrate any
proposed extension.
Modern extension on traditional building reflecting the simple vencular of
the original building
The Scottish Government provides further
details about householder applications here.
290

Page 285

53
Materials
The Placemaking Guide emphasises the importance of using
appropriate materials to the surrounding context. When it
comes to extensions, using materials that reflect the existing
building helps to create a harmonious addition.
Timber extension blends in sympathetically with the stone building whilst using a contraasting material
When designing your
extension:
● Choose materials
characteristic of the
existing building.
● Ensure that the colour
of the materials is
harmonious with the
exiting building.
● Chose high quality
materials that are
sustainable and long-
lasting.
● Recycle materials
whenever possible and
avoid unsustainable
materials whenever
possible. 
291

Page 286

54
Types of Householder Applications
There are a range of householder applications that require
careful thought before making an application. The following
section provides some guidance the issues that a planning
officer will consider when assessing a submission.
Roof extensions and alterations
It is important that roof extensions and alterations fit with
the local street character. Think carefully about the context
before:
● Converting an existing hipped roof into a gabled roof.
● Altering the streetscence by changing the roofscape
and space between buildings.
● Creating over dominant dormer windows.
An appropriate dormer extension should as a minimum:
● Be set below the ridgeline of the roof.
● Be set back from the wall-head.
● Be generally of pitched roof form.
● Be physically contained within the roof pitch.
● Relate to windows and doors in the lower storey(s) in
terms of character, proportion and alignment.
● Have the front face predominantly glazed.
● Not extend more than half the length of the roof plane.
Poor responses to roof pitch
292

Page 287

55
Front extensions
Front extensions should generally be avoided, in particular:
● Where they dominate the principal elevation of the
property
● Where visual impact on an established streetscape is
evident
However:
● Modest porches or canopies may be an acceptable
addition, providing that the rhythm of a repeating
streetscene is not impaired. A well designed porch can
occasionally enhance the character and appearance
of a dwelling.
Modest porch painted to match the windows
SIde extensions
● Provide an adequate and distinct separation between
properties.
● Set back the extension from the frontage of the
building to establish subordination to the existing
building.
● Lower the roof ridge level on extensions to establish a
separate identity to extension.
● Ensure that windows on extensions provide adequate
light whilst ensuring privacy to neighbouring
properties.
Well positioned side
extension which is
set back from the
building lines
293

Page 288

56
Rear extensions can provide greater opportunites for contemporary
design
Rear extensions
● Appropriately designed rear extensions are generally
preferable to side and front extensions, particularly on
traditional and historic properties.
● If the plot and original building can accommodate
it, then a two storey extension may receive planning
permission providing the design is satisfactory and
there is no unacceptable loss of sunlight, daylight or
privacy to adjoining properties.
Conservatories & sun rooms
● Designs should be site specific and proportionate to its
location. Choose materials appropriate to the building.
● Site conservatories to the rear of properties and of an
appropriate height.
● Proposals for a new conservatory on a listed building
should ensure that the original stonework inside a
conservatory remains unpainted and that the colour
and materials of the conservatory respects the
building and wider area.
Outbuildings & garages
Generally, these buildings should:
● Be subordinate to the original building and should not
obscure the approach to the house.
● Be set back from the frontage.
● Be built with materials which respect the house and its
surroundings.
294

Page 289

57
Balconies, roof terraces and decking
Generally, balconies and roof terraces should avoid:
● Being located too close to boundaries.
● Overlooking neighbouring properties.
● Dominating or detracting from the appearance of the
house.
● Over-dominant lighting that adversely impacts on
neighbours.
Decking
Generally should be designed:
● Close to ground level, whilst working with garden
levels.
● Of a simple design (including barriers and steps).
Flues & fuel storage facilities
Whilst wood burning stoves and biomass boilers located
within the house do not require planning permission, the flue
and any fuel storage facility may require permission. It is
best to check with the Council before installation. A building
warrant will be required to cover installation, the flue and fuel
storage. This advice covers domestic stoves and boilers up to
45kW (heat) output.
Decking that works well with garden levels
295

Page 290

58
Masterplanning                                            
A Masterplan is not simply a document, a layout or a vision
for a site. A Masterplan is a process that requires to be
undertaken in order to reach the decisions, the vision, the
layout that you determine for a site. The following section
provides a checklist of what Perth & Kinross Council requires
in terms of a Masterplan.
● Engage with the local community.
How does the proposal relate to local
needs and aspirations? Read more on
Community Engagement here.
● Initiate pre-application discussion
with the Council to discuss early design
decisions, open space requirements
and road layouts.
● Confirm requirements on access and
services with key agencies.
Muirton redevelopment Masterplan provided a clear framework from the
outset that was then delivered in phases
296

Page 291

59
1. Determine the status of your site
• Check LDP for designations & any site specific requirements
• Identify relevant policies and guidance
• Establish site ownership and identify key stakeholders
2. Develop initial idea and design concept
• Study the wider context and site features to draft an
appraisal
• Form a vision for the project and identify aims and aspirations
• Prepare conceptual design and initial sketches
• Draft your Implementation Strategy
• Start the pre-application consultation process early and leave
room for flexibility and input from stakeholders
3. Finalise the detailed proposal
• Take the outcome of consultation on board and continue
discussions with key stakeholders to refine the detailed
proposal
• Go through the development checklist below to make sure
your proposal meets all the requirements
• Complete the Sustainability Statement
4. Submit planning application
• Show how the proposal evolved throughout the design
process
• Have a look at the submission checklist. Make sure drawings
and illustrations are clear and easy to understand
THE MASTERPLAN
PROCESS:
Concept sketch indicating movement patterns and open space
connectivity (Proctor & Matthews Architects)
297

Page 292

60
Distinctive
● Materials, colours and details fit in with the character
of the area.
● Historic features such as listed buildings and
their settings are preserved where possible and
incorporated with the proposal.
● Appropriate boundary treatment is used to define
new settlement edge and provide a clear division
between public and private space.
● The proposal provides active frontages to the street
and attractive private spaces to the rear.
Example of well
desinged street (Allan
Swan, Bain Swan
Architects)
● Density, scale, height and massing are appropriate for the
given context without creating a poor imitation of what
exists.
● The development creates new points of interest (e.g. key
views, distinctive design) to help people navigate around
the site.
● Street furniture is designed well and located carefully to
avoid clutter.
● Enhance streetscapes and car parking with wide
pavements or shared surfaces, street-trees or swales.
Use 3D visuals to illustrate heights and massing and materials (Proctor &
Matthews Architects)
298

Page 293

61
Safe & Pleasant
● Flood risk has been considered and mitigated against.
Drainage and SUDS are considered from the outset
and are designed, based on the existing natural
drainage patterns and as part of the wider green
infrastructure
● The arrangement of buildings encourages various
road speeds and natural traffic calming.
● Front gardens, especially on prominent frontages and
gateway points are retained and parking is provided
to the rear.
● Public spaces, streets and paths are well-lit and
they are overlooked by windows providing natural
surveillance
SuDS basin deisnged as part of wider amenity space. Planting increases
biodiversity value.
Open space in Muirton has been desinged to be overlooked and reduce
road speeds
299

Page 294

62
Easy to move around and beyond
● The proposal has a street pattern that connects
strongly to the existing settlement and improves
connectivity - cul-de-sac layouts should be avoided.
● The hierarchy of roads and pedestrian routes and
sizes of urban blocks create accessible places which
are easy to navigate.
● The proposal fits in with the existing built form and
enhances the connectivity of streets and green
spaces.
● Public transport nodes in the vicinity of the site are
graphically represented and are easily accessible from
the development.
● Opportunities have been taken to create a walking and
cycle friendly infrastructure and connect to existing
active travel routes.
● Existing natural features such as hedgerows, trees or
watercourses have been surveyed and incorporated
in the right locations with the layout and design of
the proposal - shelter belts and wildlife corridors are
retained with adequate buffer space around them
and connections are enhanced.
● The layout of access roads should respond to
landscape views by creating vistas and aim to create
a distinct and legible non-labyrinthine pattern that
helps orientation by providing foci and visual and
spatial continuity including some larger scale
continuous connections across a site and into other
neighbourhoods, overall providing a clear hierarchy of
roads that differ in their function, length and width.
● The proposal includes a highly functional network of
walking and cycling paths forming larger connections
across and beyond the development, linking points of
interest and greenspaces. These should be wherever
possible be separate from vehicular traffic and aligned
with proposals for green networks and greenspaces
and connect into existing routes .
Sketch shows public transport routes and movement patterns. There are clear
connections to the subsequent phases of development (Barton Willmore & Urban
Union)
300

Page 295

63
Welcoming
● The proposal fits into the landscape and the natural
topography and is designed to avoid excessive
re- levelling or terracing of the site. It introduces or
reinforces structural landscaping where appropriate.
● Connectivity between different phases of
development is considered.
● Open spaces are biodiverse, safe and maintenance
efficient.
● All open space has a purpose and defined function -
they are connected, creating a network of blue and
green infrastructure.
● Planting and landscaping requirements have been
met.
● Open spaces and streets are designed holistically with
a clear framework and hierarchy.
Visulisation drawing of Bertha Park set in surrounding landscape  demonstrating
planting and open space (Springfield)
301

Page 296

64
Adaptable
● In mixed use areas compatible uses are located beside
one another.
● The built form is flexible and allows for changes over
time.
● Residential tenures are mixed throughout the site
while keeping a consistent, high-quality design.
● The proposal supports local infrastructure and
contributes to the improvement of facilities where
possible.
Resource efficient
● Buildings and public spaces are orientated to
maximise solar gain and views to the wider landscape
or greenspaces.
● Shelter is maximised by the topography of land, trees
and buildings.
● Renewable energy solutions have been incorporated.
● Local materials are used where practical in order
reduce the development`s carbon footprint.
● Recycling facilities and initiatives have been
incorporated.
Solar panels and planting visulised for Bertha Park (Springfield)
Checklist of reports for Masterplanning:
● Technical data (e.g. Drainage Impact Assessment,
Flood Risk Assessment etc).
●  Record of Community Engagement.
●  Design & Access Statement.
●  Landscape and Visual Impact Assessment.
●  Form & layout.
●  Visual representation of the development (3D model,
graphic illustrations etc).
302

Page 297

65
Shopfronts, Advertisement and Signage
A wide variety of types and styles currently characterise
and may be considered acceptable within Perth and Kinross
streetscapes. In each case, it is important that a shopfront is
designed within its wider street elevation context and integrates
or successfully relates to the architecture of the building.
Historic and modern shop fronts
● Proportions, detailing, colours and materials all add to
the quality of a building or streetscene.
● Listed buildings and unlisted buildings in conservation
areas and existing historic shopfronts and signage
should always be retained and repaired.
Contemporary shopfront with a high quality material finish
Where historic shopfronts have previously been altered
unsympathetically, applicants are encouraged to repair and
reinstate missing elements. New shopfronts should seek to:
● Reinstate the historic design where evidence for this
exists (e.g. from historic photographs or where original
shopfronts remain in a uniform group).
● Respect the historic design, proportions and materials
of the building and the wider group.
● New shopfronts of contemporary design of high
quality may be acceptable where this respects its
context and can be introduced without undermining
the uniformity of a group composition.
Restoration of historic shop front
303

Page 298

66
Inappropriate boxed and internally illuminated deep fascias, out of scale
with their buildings
Signage and advertisement
● Remain within the
limits of the historic
proportions of the
shopfront and fascia.
● Use appropriate
materials, usually
traditional or natural
materials including
timber, paint and
applied metal.
● Have sensitively
designed and
integrated
illumination - on
many listed buildings
and in important group compositions, illumination may
not be acceptable at all.
● Plastics, deep box-type fascias, internal illumination
should be avoided.
● Projecting signs should be sensitively attached to
the façade, normally at fascia level and avoiding
important architectural elements - there should
generally only be one projecting sign per elevation.
New lettering sensitively designed and installed on historic fascia, both in
scale and in keeping with shopfront
Appropriate projecting sign with
quality materials and detailing
304

Page 299

67
Shopfronts can often be enhanced with outdoor
displays. However, they must not block the street
or prevent access to the shop. If you wish to place
non-permanent features or displays on the street,
ensure you speak with PKC beforehand.
Canopies
● Awnings or canopies on historic buildings should only
be installed where they will not harm the character of
the building or street elevation.
● Where acceptable they should be of a traditional,
retractable canvas design with the roller box recessed
into the shopfront.
Dutch blind or canopy (left), which is not a typical detail found in the Perth& Kinross area. The reinstated projecting (retractable) canopies in the picture
to the right are more in keeping with the historic canopies found in the area.
305

Page 300

68
Urban infill development is recognised as the practice of
developing vacant or under-used parcels within existing
urban or developed areas that are already largely developed.
Many settlements or neighbourhood areas have parcels
of vacant land within a settlement boundary which have
been overlooked or left undeveloped for historic reasons.
Where appropriate, infill development should look to involve
more than the piecemeal development of individual plots. 
Looking at the wider area, an optimal infill development
scenario should focus on the holistic development of joined
up vacant parcels to serve and reinforce well-functioning
neighbourhoods. 
There are two areas of infill that this technical note will focus
on:
●  Backland development
●   Gap & Brownfield Sites
Urban Infill Development                                              Backland development
Backland development consisting of one or more dwellings
situated immediately behind one another is generally
unsatisfactory in any location, but particularly when sited
on modest sized plots or sharing a single access due to
associated problems with:
● overlooking
● noise and light disturbance
● general loss of amenity
● adverse impact on the character of the area
Example of backland development which is generally not supported.
The amenity of neighbouring properties would be impacted by the new
dwelling and additional driveway.
Tip: Don’t forget to check if you need a bat
survey as this may delay your application.
See the Bat Survey Guidance for further
information.
306

Page 301

69
On exceptionally large plots it may be possible to achieve
a sufficient separation between dwellings. There may be
potential to add a sensitively designed new dwelling which
appears subservient to the existing house.
Backland development may only be permitted where:
● a separate and satisfactory vehicular access can be
provided;
● the amenity of both new and existing properties can
be safeguarded;
● the proposal is subordinate or in keeping with the
scale, density and character of existing development in
the locality;
● the proposal conforms to other salient policy and
guidance.
Gap & Brownfield Sites
Gap and brownfield sites can both contribute positively to the
regeneration of a street or wider settlement, depending on
the site scale, situation and proposed end use.
Be aware that in certain cases, development plan policy may
dictate that a site should remain undeveloped or retained as
open space for its wider amenity value. 
Gap sites in Perth & Kinross commonly relate to one or two
plots as part of an urban street, which have been previously
developed or undeveloped.
Traditional tight urban form and historic building character provided
this opportunity for a contemporary house on a backland site where a
outhouse once stood
In every case, regard should always be given to
the local building context, character, density and
site specific circumstances.
307

Page 302

70
Brownfield sites are previously developed
sites and can include single house sites, right
up to large former industrial sites, which
may most appropriately be addressed by
a masterplan, development brief or other
salient development plan policy.
Any proposed development on a gap or
brownfield site may only be permitted were:
● The proposal enriches and does
not detract from the character
and qualities of the existing built
environment.
● The site size, form, density,
architecture and the scope fits in with
the character of the surrounding area.
● Any direct or indirect impact on
landscape or biodiversity have been
considered and mitigated.
● Environmental assessment of ground
conditions and/or associated building
contamination through historic
site uses or associated building
materials have been considered and
the proposal is viable despite these
constraints.
Positive examples
of urban infill sites
where contemporary
design and
traditional solutions
fit in well with the
historic streetscape.
308

Page 303

71
Windows & Doors in Listed Buildings & Conservation Areas                                    
These planning guidelines set out the main considerations
when carrying out work to windows and doors in a listed
building, or a traditional unlisted building in a conservation
area.
Windows
● Planning permission is required for replacement
windows in a conservation area.
● Listed building consent is required for replacement
windows in a listed building.
● A building warrant may also be required – contact
the Building Standards service for further advice.
Windows are a vital part of a building’s character. By
replacing them using a different style or material, it can
have a negative effect on the appearance of the building.
Small changes may only affect one building, but many small
changes over time can be detrimental to the character of a
whole area.
In many of the domestic properties in Perth and Kinross
the traditional window is timber sash and case. This type
of window has been in continuous use since the late 17th
century, and while styles may have changed over the years,
it is a testament to their effectiveness and construction that
they have survived for so long.
Timber windows differ greatly in terms of their style and
detailing. Some older properties may have leaded windows or
casement windows that open inwards and are manufactured
of timber, cast iron or later, steel. In Georgian buildings,
round-headed windows and semi-circular fanlights often
feature; and in Victorian and Edwardian buildings, stained
glass can be an important element of windows and doors.
It is an offence to alter the character of a listed
building without permission, and this applies
to replacement windows. Work that alters the
character of a listed building requires Listed
Building Consent which is issued by Perth and
Kinross Council.Replacement windows, double glazed but retain slim, elegant Georgian
proportioned astragals
309

Page 304

72
Development Checklist
On receipt of an application we will consider whether the
proposals protect and enhance the traditional character and
appearance of a listed building or conservation area. Where
the work relates to a tenement or flat it should be ensured
that new windows are in keeping with the original scheme, in
order to retain uniformity.
Where it is proposed to replace windows in a listed
building, justification will be required in order to process the
application. This should take the form of an illustrated report
setting out the condition of each window and the reasons for
its replacement.
In listed buildings:
● Retain and repair existing traditional windows
where possible.
● Ensure that replacement windows match the
original in every detail including materials, design,
opening method and paint finish.
● Take the opportunity of installing appropriate new
windows where the existing windows are modern
replacements not in keeping with the building.
In unlisted buildings in conservation areas:
● In listed buildings and conservation areas the
use of external secondary glazing and plant-on
or sandwich astragals (non-structural astragals
applied to the glass surface) is not acceptable.
● Ensure that replacement windows on the front and
all sides of the building visible to the public match
the original as closely as possible.
● Take the opportunity of installing appropriate new
windows where the existing windows are modern
replacements not in keeping with the building or
area.
Unacceptable replacement window with flat, wide astragals (left) &
original window requiring some repair only (right), both first floor found
in the same property
310

Page 305

73
While many windows have been painted brilliant white since
the 1950s, the use of shades of blue, greys, green, dark red,
brown and off-white are traditional and will be encouraged
where there is evidence of a colour having been used in the
past, e.g. through paint sampling.  The unity of whole buildings
or blocks should be ensured, and the impact a change of
colour may have on a conservation area taken into account. 
Colours will be agreed in writing with the Council prior to
painting and the colour to be used will normally be specified
by its BS number rather than trade name.Modern stained
finishes are not acceptable.
Replacement windows
If windows have deteriorated
to the extent that repair is no
longer viable, replacement
windows should replicate the
original in every respect. They
should be fitted in the same
plane as the originals, made
up of timber sections (the
profile and dimension of which
match the originals), and
have the meeting rails in the
same position as the originals.
Mullions (vertical dividers that
separate windows) should be
retained.
Poor response to traditional sash
and case window
Issues and considerations
Repairing and upgrading existing windows
When considering repairing or replacing timber windows, a
professional with experience of working on historic buildings
should always be consulted.
It may be cheaper to repair and upgrade existing timber
windows and features such as shutters to modern standards
rather than to replace them, and retention of original features
is always preferable in historic buildings or areas because it
retains character and authenticity. Appropriate repairs will
often improve the thermal efficiency of your home without the
negative effects that may result from the use of inappropriate
modern materials.
Retaining and repairing existing windows is a sustainable
way of improving your home. Many timber windows and
doors have lasted over 200 years. In contrast, some
modern windows may only last 20 years and when they fail,
replacement of the whole unit is often necessary.
Original crown or cylinder glass may remain in timber
windows. This has a subtle, rippled effect that cannot be
created in modern glass and adds greatly to the character of
a building. Every effort should be made to retain it.
311

Page 306

74
Doors
● Planning permission is required for replacing
external doors or changing the paint colour of
doors in a conservation area.
● Listed building consent is required for replacing
external doors or changing the paint colour of
doors in a listed building.
Doors and their associated features such as steps or
surrounds are a vital part of a building’s character. By
replacing them using a different style or material, it can
have a negative effect on the appearance of the building.
Small changes may only affect one building, but many small
changes over time can be detrimental to the character of a
whole area.
Traditional doors are generally painted pine or oak, with the
design dependent on the building type but usually a variation
on vertical boarding or panelled construction. There may be
a storm or outer door with an inner vestibule and internal
glazed door.
Development Checklist
On receipt of an application we will consider whether the
proposals protect and enhance the traditional character and
appearance of a listed building or conservation area. Where
the work relates to a tenement or flat where there is more
than one entrance door it should be ensured that new doors
It is an offence to alter the character of a listed
building without permission, and this applies to
replacement doors. Work that alters the character
of a listed building requires Listed Building Consent
which is issued by Perth and Kinross Council.
are in keeping with the original architectural design, in order
to retain uniformity.
In listed buildings:
● Retain and repair existing traditional doors where
possible.
●  Ensure that replacement doors match the original
in every detail including materials, design, glazed
elements, ironmongery and paint finish.
●  Take the opportunity of installing an appropriate
new door where the existing is a modern
replacement not in keeping with the building.
312

Page 307

75
Two positive examples, where replacement doors enhance the
appearance of the historic building & conservation area
Issues and considerations
●  It may be cheaper to repair and upgrade existing
timber doors and associated features to modern
standards rather than to replace them, and
retention of original features is always preferable
in historic buildings or areas because it retains
character and authenticity. Appropriate repairs
will often improve the thermal efficiency of your
home without the negative effects that may result
from the use of inappropriate modern designs or
materials.
●  Retaining and repairing existing doors is a
sustainable way of improving your home. Many
timber windows and doors have lasted over 200
years. In contrast, some modern doors may only
last 20 years and when they fail, replacement of
the whole unit is often necessary.
The choice of colours on
door and window frames
impacts on the original
symmetry of the building
In traditional, unlisted buildings in conservation areas:
●  Ensure that replacement doors on the front and all
sides of the building visible to the public match the
originals as closely as possible.
●  Take the opportunity of installing an appropriate
new door where the existing is a modern
replacement not in keeping with the building or
area.
313

Page 308

76
Monitoring
The Placemaking Guide will be monitored and reviewed in
terms of its value to Development Management, Developers,
Elected Members and Communities.  This will be implemented
through annual workshops discussing the successes and
weaknesses of the guidance in terms of the planning
application process. A placemaking evaluation toolkit will also
be undertaken using the guidance checklists as the basis of
the assessment.
Design Panel
The Council will investigate the establishment of a Local
Design Review Panel to support the Placemaking process
when assessing planning applications.  This will be attended
by a range of representatives who have an understanding of
the local context, or/and have professional experience, and
who can add constructively to discussions on projects.  The
review process recognises that high qualities of architectural
and urban design are key objectives for the planning process
and that design is a complex matter.  The benefit from
informed advice at an early stage will assist projects as they
move into the more formal planning process.
Placemaking Action Plan 4
Design Training
The Council intends to organise a programme of design
training for Elected Members, Officers, Developers and
Community Councils.  This will help to raise awareness of the
importance of good placemaking.  There should be a rolling
programme of training, ensuring that it captures as wide an
audience as possible.  This, in turn, aims to raise the standards
of design in Perth and Kinross.
Design Awards
The Council aims to promote a set of Design Awards that
will celebrate good placemaking in Perth and Kinross.  This
will highlight good practice in the area and raise awareness
of Council’s aspirations in terms of quality design. The
placemaking evaluation toolkit will be used as the basis for
these awards.
314

Page 309

77
www.pkc.gov.uk (PKC Design Team - 2018004)
All Council Services can offer a telephone translation
If you or someone you know would like a copy of this
document in another language or format, (on occasion,
only a summary of the document will be provided in
translation), this can be arranged by contacting the
Customer Service Centre on 01738 475000.
You can also send us a text message on 07824 498145.
315

Page 310

316

Page 311

Mr Paul Attewell
22-26 East High Street
Crieff
PH7 3AF 
Pullar House
35 Kinnoull Street
PERTH  
PH1  5GD 
Date of Notice: 13th April 2021 
Town and Country Planning (Scotland) Acts. 
Application Number 21/00318/FLL 
I am directed by the Planning Authority under the Town and Country Planning (Scotland)
Acts currently in force, to grant your application registered on 27th February 2021 for
planning permission for Renewal of permission 18/00471/FLL (Change of use and
alterations to storage building (class 6) to form a dwellinghouse) at 20 East High Street
Crieff PH7 3AF    subject to the undernoted conditions. 
David Littlejohn
Head of Planning and Development 
Conditions referred to above 
1 The development hereby approved must be carried out in accordance with the
approved drawings and documents, unless otherwise provided for by conditions
imposed by this decision notice. 
Reason - To ensure the development is carried out in accordance with the approved
drawings and documents. 
2 Development shall not commence until the developer has secured an archaeological
standing building survey, to be carried out by an independent and suitable qualified
archaeological organisation.  The scope of the archaeological standing building survey
will be set by Perth and Kinross Heritage Trust on behalf of the Council as Planning
Authority.  The name of archaeological organisation retained by the developer shall be
given to the Planning Authority and Perth and Kinross Heritage Trust in writing not less
than fourteen days before the commencement date provided in the Notice of Initiation of
Development.  Copies of the resulting survey shall be deposited in the National
Monuments Records for Scotland and in the Perth and Kinross Historic Environment
Record upon completion of the survey. 
317

Page 312

Page 2 of 6 
Reason - To ensure archaeological monitoring is carried out to safeguard and record
any archaeological remains within the development area. 
3 The repointing of the red sandstone should be with an appropriate lime mortar. Prior to
the commencement of the development hereby approved details of the lime mortar shall
be submitted to and for the further approval in writing by the Council as Planning
Authority. The approved details shall thereafter be implemented. 
Reason - In the interests of visual amenity; to ensure a satisfactory standard of local
environmental quality. 
Justification 
The proposal is in accordance with the Development Plan and there are no material
reasons which justify departing from the Development Plan. 
Informatives 
1 This planning permission will last only for three years from the date of this decision
notice, unless the development has been started within that period (see section 58(1) of
the Town and Country Planning (Scotland) Act 1997 (as amended)). 
2 Under section 27A of the Town and Country Planning (Scotland) Act 1997 (as
amended) the person undertaking the development is required to give the planning
authority prior written notification of the date on which it is intended to commence the
development. A failure to comply with this statutory requirement would constitute a
breach of planning control under section 123(1) of that Act, which may result in
enforcement action being taken. 
3 As soon as practicable after the development is complete, the person who completes
the development is obliged by section 27B of the Town and Country Planning (Scotland)
Act 1997 (as amended) to give the planning authority written notice of that position. 
4 No work shall be commenced until an application for building warrant has been
submitted and approved. 
5 The proposed demolition and/or building works likely to cause harm to bats should not
commence until the applicant has obtained the relevant  licence issued by NatureScot
pursuant to Regulation 53 of The Conservation of Habitats and Species Regulations
2010 authorizing the specified activity/development to go ahead. 
6 Prior to the commencement of any development, in order to minimise disruption to the
local roads network, the applicant should apply for  permission from Perth and Kinross
Council Parking Section to close off the parking bay(s) adjacent to the pedestrian
access to the development. 
318

Page 313

Page 3 of 6 
The plans and documents relating to this decision are listed below and are
displayed on Perth and Kinross Council’s website at www.pkc.gov.uk “Online
Planning Applications” page 
Plan and Document Reference 
18/00471/1 
18/00471/2 
18/00471/3 
18/00471/4 
18/00471/5 
18/00471/6 
319

Page 314

320

Page 315

321

Page 316

322

Page 317

323

Page 318

324

Page 319

325

Page 320

326

Page 321

327

Page 322

328

Page 323

to 70
4
197
66
3 to 9
1012
204
208
6
Tryst
Building
194
Ps
137
2
5
Perth Methodist Church
196
222
194
210 to 214
192
3
Hall
PH
TCB
SCOTT STREET
19
11 to 17
42
to
28
58 to 64
44
205
151145
194
to
198
192
188
Hall
45 to 53
209
67 to 71
208 to 218222 to 232
61 to 65
14 to 16
Loretto House
38
55 to 59
211
40
6.1m
58 60
41
157
181
6.1m
155
180
56
11
160 to 166
LB
Monument
182
141143
Bank
189
3
187
178
176
174
153
175
168
169a
79
172
43
17
PH
170
179
1
177
PH
52 54
44 to 50
39
49
139
185
161 159165167
70
El Sub Sta
173
10
16
23
House
5
19
7.0m
Club
213 to 219237
PH
171
188
3
2
15
Bank
1 to 5
200
WEST MILL STREET
17
7
229
9 to 13
13
33
37
39
46
PH
35
4
El Sub Sta
180
to
182
12
to
11 to 15
to
to
to
1 to 9
Drummond
to
209
186
HIGH STREET
225
10
31
54
37
6
189 to 195
18
207
to
21
Bus Station
29 to 35
8
to
43
14
199
32
223
8
to
34
PH
52 to 58
36
19
73
50
Bordeaux House
SOUTH
METHVEN
STREET
North
17
20 to 30
25
32 to 42
TCBs
Car Park
23 to 27
18
Church
1 to 10
9
235
14
178
233
41
31
to
16
2 to 16
LB
to 77
6
6 to 12
23
Church
37MURRAY STREET
ST PAUL'S SQUARE
202
190
6.7m
TCB
169b
29
PH
PH
3705 01/ A
MERCAT HOUSE
1 CHURCH STREET
ST ANDREWS
SCOTLAND, UK
KY16 9NW
01334 472244
www.mwparchitects.co.uk
mail@mwparchitects.co.uk
CLIENT
SCALE JOB No DWG/REV
COPYRIGHT OF MUIR WALKER & PRIDE.
VERIFY ALL DIMENSIONS AND LEVELS.
DRAWING PREPARED FOR OBTAINING CONSENTS ONLY; NOT TO BE USED
FOR CONSTRUCTION PURPOSES.
The Bathroom Company
DATE
DRAWN
1:1250 @A4
JULY 2022
DJR
PROJECT 208 High Street
Perth
DRAWING Location Plan
0 10050
329

Page 324

W02 D01
W01
LIVING ROOM
BEDROOM
BATHROOMHALLWAY
CPD
KITCHEN
CPD W
STORE/ KITCHEN
STORE/ WC
HALLWAY
TR
S
A A
PEND
step
step
UP
steps
down
ramp
down
ATTIC / STORE
STORE/ KITCHEN HALLWAY
ATTIC / STORE
4060 01
MERCAT HOUSE
1 CHURCH STREET
ST ANDREWS
SCOTLAND, UK
KY16 9NW
01334 472244
www.mwparchitects.co.uk
mail@mwparchitects.co.uk
CLIENT
PROJECT
DRAWING
SCALE
DATE
DRAWN
JOB No. DWG/REV
THE BATHROOM COMPANY
208 HIGH STREET
PERTH
PH1 5PA
SURVEY DRAWING
AS SHOWN @ A1
COPYRIGHT OF MUIR WALKER & PRIDE.
VERIFY ALL DIMENSIONS AND LEVELS.
DRAWING PREPARED FOR OBTAINING CONSENTS ONLY;
NOT TO BE USED FOR CONSTRUCTION PURPOSES.
JUNE 2022
DJR
NOTES / REVISIONS
0 42
SCALE BAR 1:50 IN METRES
0 7.55
SCALE BAR 1:100 IN METRES
NORTH ELEVATION (SECTION A-A)
@1:50
SOUTH ELEVATION
@1:100
WEST ELEVATION
@1:100
GROUND FLOOR PLAN
@1:50
ROOF PLAN
@1:100
ATTIC FLOOR PLAN
@1:50
EAST ELEVATION
@1:100
330

Page 325

331

Page 326

332

Page 327

4060 11
MERCAT HOUSE
1 CHURCH STREET
ST ANDREWS
SCOTLAND, UK
KY16 9NW
01334 472244
www.mwparchitects.co.uk
mail@mwparchitects.co.uk
CLIENT
PROJECT
DRAWING
SCALE
DATE
DRAWN
JOB No. DWG/REV
THE BATHROOM COMPANY
208 HIGH STREET
PERTH
PH1 5PA
PLANNING DRAWING
WINDOW & DOOR DETAILS
AS SHOWN @ A1
COPYRIGHT OF MUIR WALKER & PRIDE.
VERIFY ALL DIMENSIONS AND LEVELS.
DRAWING PREPARED FOR OBTAINING CONSENTS ONLY;
NOT TO BE USED FOR CONSTRUCTION PURPOSES.
AUG 2022
DJR
NOTES / REVISIONS
ENTRANCE DOOR DETAILS (D01)
@1:10
0 0.80.4
SCALE BAR 1:10 IN METRES
WINDOW DETAILS (W01)
@1:10
WINDOW DETAILS (W02)
@1:10
WINDOW DETAILS (W03)
@1:10
EXISTING ENTRANCE DOOR ELEVATION (D01)
@1:10
EXISTING WINDOW ELEVATION (W01)
@1:10 EXISTING WINDOW ELEVATION (W02)
@1:10
333

Page 328

Edition 2.0 – 13.09.2017
Product information
VELUX INTEGRA® 
centre-pivot roof window GGL
Product description
 Icon based control pad with eight pre-set programs. The
programs can manage products and control the indoor
climate – also possible to design personal programs
 Pre-installed hidden window operator
 Silent motor operation
 Rain sensor ensures that the window closes automatically in
case of rain
 Easy installation of mains powered decoration and
sunscreening products
 Control pad uses secure radio frequency (RF) technology to
operate individual or groups of roof windows, blinds,
awnings and roller shutters from anywhere in the building
 Control pad can operate up to 200 products
 Ventilation flap allows fresh air to circulate even when your
window is closed
 Integrated dust and insect filter
Roof pitch
 Can be installed in roof pitches between 15° and 90°
Materials
 High quality natural pinewood coated with impregnation and
layers of water-based acrylic clear lacquer or white paint
 VELUX ThermoTechnologyTM insulation ensures an excellent
energy performance
 Maintenance-free exterior covers in lacquered aluminium
Downloads
For installation instructions, CAD drawings, 3D BIM objects,
3D GDL objects etc, please visit www.velux.co.uk
Certifications
The VELUX product
factories guarantee
quality systems
implementation process
and environmental
management systems
through appropriate
accreditations ISO
9001 and ISO 14001  
EUTR In compliance with the EU Timber
Regulation (EUTR), EU regulation
995/2010  
REACH We are aware of the REACH regulation
and acknowledge the obligations. No
products are obliged to be registered in
accordance to REACH and none of our
products contains any Substances of
Very High Concern.
334

Page 329

Product information: VELUX INTEGRA® Centre-pivot roof window GGL VELUX®   2
Available sizes and daylight area
472
mm
550
mm 660 mm 780 mm 942 mm 1140 mm 1340 mm
778
m
m GGL
CK02
(0.22)
978
m
m
GGL
BK04
GGL
CK04
GGL
FK04
GGL
MK04
GGL
PK04
GGL
UK04
(0.29) (0.29) (0.38) (0.47) (0.60) (0.91)
1178
m
m
GGL
CK06
GGL
FK06
GGL
MK06
GGL
PK06
GGL
SK06
(0.37) (0.47) (0.59) (0.75) (0.95)
1398
m
m
GGL
FK08
GGL
MK08
GGL
PK08
GGL
SK08
GGL
UK08
(0.58) (0.72) (0.92) (1.16) (1.40)
1600
m
m
GGL
MK10
GGL
PK10
GGL
SK10
GGL
UK10
(0.85)  (1.07)  (1.35)  (1.63)
Lining measurements
Size Width (mm)
BK-- 417
CK-- 495
FK-- 605
MK-- 725
PK-- 887
SK-- 1085
UK-- 1285
Size Height (mm)
--02 719
--04 919
--06 1119
--08 1339
--10 1549
( ) = Effective daylight area, m2
Recommended application
Mains powered VELUX INTEGRA® roof windows are
 perfect for new installations where frequent use of the window is essential
 ideal for out-of-reach situations or when extra convenience is needed
VELUX INTEGRA® control pad with intelligent programs ensures
 a perfect level of energy efficiency and comfort
 easy ventilation and better indoor air quality
Width Height
49.3
Daylight/sash aperture
External frame
27.3
12.5
27.3Lining groove
89.7
104.4
Daylight/sash aperture
11 28.8
30
Lining groove
External frame
335

Page 330

Product information: VELUX INTEGRA® Centre-pivot roof window GGL VELUX®   3
Technical values
--60 --62 --66 --70
Uw [W/m2K] 1.3 0.83 1.0 1.3
Ug [W/m2K] 1.0 0.5 0.5 1.0
Rw [dB] 37 42 37 35
g [ ] 0.30 0.52 0.51 0.46
V [ ] 0.62 0.70 0.71 0.68
UV [ ] 0.05 0.05 0.05 0.05
Air permeability [class] 4 4 4 4
Thermal improvements such as lower U-value (Uw) and lower linear heat loss coefficient (φ) can, for some variants, be obtained with frame insulation collar and/or recessed installation.
Glazing structure
--60 --62 --66 --70
Inner glass pane
2 x 3 mm laminated
float with 
low ε coating
2 x 3 mm laminated
float with 
low ε coating
2 x 3 mm laminated
float with 
low ε coating
2 x 3 mm laminated
float with 
low ε coating
Middle glass pane -
3 mm heat
strengthened float with
low ε coating
3 mm heat
strengthened float with
low ε coating
-
Outer glass pane 6 mm toughened
with coatings
8 mm toughened with
coating
4 mm toughened
with coatings 4 mm toughened
Cavity 15 mm 2 x 10 mm 2 x 12 mm 15 mm
Glass panes Double Triple Triple Double
Gas filling Argon Krypton Krypton Argon
336

Page 331

Product information: VELUX INTEGRA® Centre-pivot roof window GGL VELUX®   4
Glazing features
--60 --62 --66 --70
Heat insulation
Low energy glazing provides reduced heat loss through the window and
enhanced indoor comfort. ●● ●●● ●●● ●
Solar gain
In the wintertime, the heat from the sun entering through the windows is a
usable solar gain. ● ●● ●● ●●●
Solar protection
In warm climates and in rooms with large window areas, a sun protective
coating provides a better indoor climate during summer periods.
Alternatively, exterior sun screening can be installed. ●●●
Sound insulation
A combination of laminated glass and optimal glass thickness provides better
sound insulation.
Frame/sash construction and gaskets are equally important. ●●● ●●● ●●● ●●
Security
Thicker laminated inner glass pane designed to increase resistance to
manual attack (burglary). ● ● ● ●
Energy balance
The energy balance represents the ability of the roof window to utilise the
passive solar gain and keep in the heat during winter and its ability to
protect against the risk of overheating during summer. Sun screening
products can further improve indoor summer comfort.
Safety
Laminated inner glass is designed to hold the fragments together if the glass
breaks. We recommend that you consider using glass units with laminated
glass on the inside for windows placed above areas where people sleep, play
or work. 
Outside strength
Toughened outer glass pane makes your glazing more resistant to hail,
heavy wind and snow loads.
Delayed fading of materials
Inner laminated glass protects materials behind the glass against the UV
radiation and therefore delays fading of the materials.
Rain noise reduction
The combination of laminated glass and extra thick glass helps provide a
significant, audible reduction of rainfall sound.
Frame/sash construction and gaskets are equally important.
Easy-to-clean
The easy-to-clean coating minimises the cleaning frequency of the outer
glass pane and gives you a clearer view in case of rain.
Anti-dew
The anti-dew coating significantly reduces the days with dew on the outer
glass pane and thus gives you a clear view.
● Good ●● Better    ●●● Best    Feature included in glazing variant
337

Page 332

Product information: VELUX INTEGRA® Centre-pivot roof window GGL VELUX®   5
Technical values, ventilation through ventilation flap
Property
Windows with double glazing
Width
CK-- FK-- MK-- PK-- SK-- UK--
Air flow characteristics [l/s] 1.9 2.3 2.8 3.4 4.1 4.8
Air flow exponent [-] 0.53 0.53 0.53 0.53 0.53 0.53
Ventilation capacity at 4 Pa [l/s] 4.0 4.8 5.8 7.1 8.5 10.0
Ventilation capacity at 8 Pa [l/s] 5.7 6.9 8.4 10.2 12.3 14.5
Ventilation capacity at 10 Pa [l/s] 6.4 7.8 9.5 11.5 13.9 16.3
Ventilation capacity at 20 Pa [l/s] 9.3 11.3 13.7 16.6 20.1 23.5
Equivalent area through ventilation flap [mm2] 2600 3100 3700 4600 5600 6600
Geometrical free area [mm2] 2800 3700 4500 6100 7200 10600
tbd: to be determined
Property
Windows with triple glazing
Width
CK-- FK-- MK-- PK-- SK-- UK--
Air flow characteristics [l/s] 1.2 1.3 1.5 1.7 2.1 2.4
Air flow exponent [-] 0.63 0.63 0.63 0.63 0.63 0.63
Ventilation capacity at 4 Pa [l/s] 2.8 3.1 3.5 4.1 4.9 5.7
Ventilation capacity at 8 Pa [l/s] 4.3 4.8 5.4 6.3 7.6 8.9
Ventilation capacity at 10 Pa [l/s] 4.9 5.5 6.2 7.3 8.2 10.2
Ventilation capacity at 20 Pa [l/s] 5.5 6.2 6.9 8.1 9.8 11.5
Equivalent area through ventilation flap [mm2] 2000 2200 2500 2900 3500 4100
Geometrical free area [mm2] 2800 3700 4500 6100 7200 10600
tbd: to be determined
338

Page 333

Product information: VELUX INTEGRA® Centre-pivot roof window GGL VELUX®   6
Visible features
Window opening Data plate Lock casing Ventilation flap
with control bar
When operated with the
control pad, the window
opens variably up to
200 mm. The window can
also be opened manually,
eg in case of power failure
Each VELUX roof window
has a unique data plate
showing type, size, variant
etc of the window. QR code
with link to local mobile
website
Electro-galvanised steel The ventilation flap is
designed with a control bar
to allow for manual
operation
Excellent
insulation Barrel bolt Brackets for
accessories Control pad
Elements of expanded poly-
styrene ensure an excellent
energy performance 
The roof window can be
rotated and secured in
position with a barrel bolt
to ensure safe and easy
cleaning of the outside
pane from the inside
With the pre-installed
VELUX Pick&Click!TM
brackets, installation of
solar powered blinds could
not be easier
Unique VELUX INTEGRA®
control pad featuring touch
screen with swipe function
and pre-set programs
339

Page 334

Product information: VELUX INTEGRA® Centre-pivot roof window GGL VELUX®   7
Visible features
Rain sensor Click-on covers Window operator
and chain  Laminated pane
The rain sensor ensures
that the window closes
automatically if it starts
raining
Click-on covers make
installation easier, faster
and safer
Fully integrated, hidden
motor with chain. Silent
motor operation
Laminated inner glass on all
variants for personal safety
Pivot hinge
VELUX high quality pivot
hinge provides stability and
perfect sash balance.
Electro-galvanised steel
340

Page 335

Product information: VELUX INTEGRA® Centre-pivot roof window GGL VELUX®   8
Cleaning and maintenance
To clean the outer
pane from the
inside, rotate sash
and secure in
cleaning position
with barrel bolt.
VELUX repair and
maintenance kits are
available.
Exterior covers
Material NCS
standard colour
RAL
nearest standard
colour
Lacquered aluminium
(-0--) grey S 7500-N 7043
Lacquered aluminium
(-5--) black S 9000-N 9005
Copper
(-1--) - -
Titanium zinc
(-3--) - -
Special colour requests, please contact enquiries@velux.co.uk
Interior finish
Clear lacquer Impregnation and layers of water-based
acrylic lacquer
White paint
Impregnation and layers of water-based
acrylic paint, 
NCS standard colour: S 0500-N, 
nearest RAL standard colour: 9003.
Special colour requests, please contact enquiries@velux.co.uk
Blinds, awnings and shutters
Interior sunscreening
Blackout blind
Roller blind
Pleated blind
Flying pleated blind
Double pleated energy blind
Venetian blind
Duo blackout blind
●●●
●●●
★
●
●●
●●
●
Exterior sunscreening
Awning blind
Roller shutter
●●●
●●●
Additional accessories
Insect roller screen ●
●●● Available in manual and mains/solar powered versions
●● Available in manual and mains powered versions
● Available in manual version
★ Available in mains powered version
The mains and solar powered versions are part of the VELUX INTEGRA® product
range. 
Flashings and installation products
Flashings:
 ED- for single installation
 EB- for twin installation
 EK- for combi installation
Available for standard and recessed installation
Installation products:
 Installation set BDX 2000 (incl. BFX)
 Underfelt collar BFX 1000 incl. transverse drainage gutter
 Vapour barrier collar BBX 0000
 Linings LS- (incl. BBX)
 Kit for lining LSG 1000 (incl. BBX)
341

Page 336

Product information: VELUX INTEGRA® Centre-pivot roof window GGL VELUX®   9
Technical information
Material and colour Roof window: See brochure or price list for variants.
Control pad: ABS, white (NCS S 1000-N), black (RAL 9005) and metallic grey.
Window operator: PBT with glass fibre, black (NCS S 9000-N) and stainless steel chain.
Rain sensor: Gold-coated sensor, grey (RAL 7022)
Size and weight Size of product including packaging: The same as equivalent manually operated roof window.
Weight: Approx 3 kg more than equivalent manually operated roof window.
Control pad: 95 x 95 x 23 mm (W x H x D), 114 g (with batteries 184 g).
Installation and use The window is classified in protection class IP44.
The window operator hidden in the top cover and functions at temperatures between -10°C and +60°C.
The control pad is for indoor use, maximum ambient temperature 50°C.
Radio frequency range: 200 m free field. Depending on building construction, the indoor range is approximately 20 m.
Installation in rooms with a high level of humidity must comply with relevant regulations (contact a qualified
electrician if necessary).
Window opening Max 200 mm within 35 seconds.
Due to a shorter chain, small/special window sizes have a different window opening.
Window opening for sizes --01 and --02 = 135 mm. Window opening for sizes --25 and --27 = 38 mm.
Power consumption 230/240 V a.c. – 50 Hz / 40 VA
Control pad: 3 x alkaline AA/LR6 (1.5 V) batteries. Expected battery lifetime: Approximately 1 year.
Motor capacity Traction capacity: Min 225 N
Pressure capacity: Min 150 N
Connection The window is equipped with a 7.5 m 2-core cable (H05VV-F) with a standard mains plug for connection to the mains
supply (2.5 m for the UK).
Compatibility The window is based on radio frequency (RF) technology, 868 MHz range, and is compatible with other products with
the io-homecontrol® logo.
The window is prepared for subsequent installation of mains powered VELUX INTEGRA® interior and exterior
decoration and sunscreening products as well as frame lights.
It is not compatible with battery powered or VELUX INTEGRA® Solar decoration and sunscreening products.
Connection to non-compatible products may cause damage or malfunction.
CE marking The window is CE-marked to indicate that it is in accordance with the EU directives CPD, LVD, MD, R&TTE and EMC for
household, trade and light industry.
Note This sheet describes the added features of mains powered VELUX INTEGRA® roof window GGL compared with 
manually operated VELUX roof window GGL. For further information on the features and specifications of GGL, please
see the main VELUX brochure.
We reserve the right to make technical changes.
342

Page 337

343

Page 338

344

Page 339

SW Public
General
 The developer should also be aware that Scottish Water requires land title to the
area of land where a pumping station and/or SUDS proposed to vest in Scottish
Water is constructed.
 Please find information on how to submit application to Scottish Water at our
Customer Portal.
Next Steps:
 All Proposed Developments
All proposed developments require to submit a Pre-Development Enquiry (PDE)
Form to be submitted directly to Scottish Water via our Customer Portal prior to any
formal Technical Application being submitted. This will allow us to fully appraise the
proposals.
Where it is confirmed through the PDE process that mitigation works are necessary
to support a development, the cost of these works is to be met by the developer,
which Scottish Water can contribute towards through Reasonable Cost Contribution
regulations.
 Non Domestic/Commercial Property:
Since the introduction of the Water Services (Scotland) Act 2005 in April 2008 the
water industry in Scotland has opened to market competition for non-domestic
customers.  All Non-domestic Household customers now require a Licensed Provider
to act on their behalf for new water and waste water connections. Further details can
be obtained at www.scotlandontap.gov.uk
 Trade Effluent Discharge from Non-Domestic Property:
 Certain discharges from non-domestic premises may constitute a trade
effluent in terms of the Sewerage (Scotland) Act 1968.  Trade effluent arises
from activities including; manufacturing, production and engineering; vehicle,
plant and equipment washing, waste and leachate management. It covers
both large and small premises, including activities such as car washing and
launderettes. Activities not covered include hotels, caravan sites or
restaurants.
 If you are in any doubt as to whether the discharge from your premises is
likely to be trade effluent, please contact us on 0800 778 0778 or email
TEQ@scottishwater.co.uk using the subject “Is this Trade Effluent?".
Discharges that are deemed to be trade effluent need to apply separately for
permission to discharge to the sewerage system.  The forms and application
guidance notes can be found here.
 Trade effluent must never be discharged into surface water drainage systems
as these are solely for draining rainfall run off.
 For food services establishments, Scottish Water recommends a suitably
sized grease trap is fitted within the food preparation areas, so the
345

Page 340

346

Page 341

Comments to the Development Quality Manager on a Planning Application
Planning
Application ref.
22/01406/FLL Comments
provided by
Lachlan MacLean
Project Officer – Transport Planning
Service/Section Transport Planning  Contact
Details
TransportPlanning@pkc.gov.uk
Description of
Proposal
Change of use and alterations to attic store to form a dwellinghouse 
Address of site 208B High Street, Perth, PH1 5PA
Comments on the
proposal 
The applicant is proposing to change a storage area and attic storage into a
one bedroomed dwellinghouse.  The property is accessed via a vennel from
Perth High Street. 
The property will have no car parking associated with it and any residents
requiring car parking will be required to park on-street or in off-street car
parks, all of which will require a charge outside of the charging regime,
should the homeowner wish to park a car in Perth City Centre. 
The property will very little outdoor space, so there would be no space to
store a bike within the vennel, so is likely to have to be stored within the
property.  One the ground floor there is a large cupboard area, that could
potentially be used for that purpose. 
Insofar as the Roads matters are concerned, I have no objections to this
proposal. 
Recommended
planning
condition(s) 
Recommended
informative(s) for
applicant 
Date comments
returned 05 October 2022 
347

Page 342

M e m o r     
To Development Management & Building  
Standards Service Manager   
Your ref 22/01406/FLL 
Date  18 October 2022 
Communities 
a n d u m 
From  Regulatory Services Manager     
Our ref  LRE 
Tel No       
Pullar House, 35 Kinnoull Street, Perth PH1 5G
Consultation on an Application for Planning Permission
22/01406/FLL RE: Change of use and alterations to attic store to form a dwellinghouse, 208B
High Street, Perth, PH1 5PA for  The Bathroom Company
I refer to your letter email dated 28th September 2022 in connection with the above application and
have the following comments to make.
Environmental Health
Recommendation 
I have no adverse comments in relation to the application. 
Comments
This application is for the change of use and alterations to store and associated atttic to form
a dwellinghouse. 
Noise
There are several air conditioning units within close proximity to the application site and a
site visit established that there are 6 units; 5 Toshiba RAv-GM301ATP-E units with sound
pressure level of 46dB  and, 1 Mitsubishi Electric – 45dB; only two were on at time of visit. 
Giving a worst case senario of all air conditioning units being on and presuming these are on
during normal working hours for the commercial property which is a bank the total sound
pressure level would be 54dB at the units 
The World Health Organisation (WHO) issued guidance in 1999 in relation to noise, at which
time it was recommended that the following sound levels should be maintained: Leq50-
55dB(A) in outdoor living areas, Leq35dB(A) in internal living areas and Leq30dB(A) in
bedrooms. This guidance is consistent with BS8233:2014 which recommends the following
sound level ranges: Leq30-40dB(A) in living areas and Leq30-35dB(A) in bedrooms. 
Given the distance attenuation to proposed dwellinghouse these levels should be achievable
for airborne noise allowing for 10-15dB reduction by a partially open window. 
There are other residential properties within close proximity to the existing air conditioning
units and to my knowledge this Service have not received any complaints with regards to noise
from these units. This Service also has powers under the Environmental Protection Act 1990
statutory nuisance  to deal with any  noise complaints. 
Therefore, I have no adverse comments to make in relation to the application for the
proposed residential property.
348

Page 343

Comments to the Development Quality Manager on a Planning Application
Planning
Application ref.
22/01406/FLL Comments
provided by
Charlie Haggart
Service/Section HE/Flooding Contact
Details
FloodingDevelopmentControl@pkc.gov.uk
Description of
Proposal
Change of use and alterations to attic store to form a dwellinghouse
Address of site 208B High Street Perth PH1 5PA
Comments on
the proposal
No objections.
Recommended
planning
condition(s) 
N/A 
Recommended
informative(s)
for applicant
The applicant is advised to refer to Perth & Kinross Council’s Supplementary
guidance on Flood Risk and Flood Risk Assessments 2021 as it contains advice
relevant to your development. 
Date
comments
returned
26/10/2022 
349

Page 344

Comments to the Development Quality Manager on a Planning Application
Planning 
Application ref. 22/01406/FLL Comments
provided by Diane Barbary
Service/Section Conservation Contact
Details 
Description of
Proposal 
Change of use and alterations to store and associated attic to form a
dwellinghouse 
Address of site  208B High Street, Perth 
Comments on the
proposal  208B High Street forms part of an unlisted building in the Perth Central
Conservation Area. 
The site is accessed via a private pend and is not publicly visible. I am content
that the impact of the proposed development on the conservation area
would be negligible. 
Recommended
planning
condition(s)  
Recommended
informative(s) for
applicant 
Date comments
returned 26/10/2022 
350

Page 345

4(i)(b)
LRB-2023-05
LRB-2023-05
22/01406/FLL – Change of use and alterations to store and
associated attic to form a dwellinghouse, 208b High Street,
Perth, PH1 5PA
PLANNING DECISION NOTICE (included in
applicant’s submission, pages 33-34)
REPORT OF HANDLING (included in applicant’s
submission, pages 35-43)
REFERENCE DOCUMENTS (included in applicant’s
submission, pages 329-330 and 332-342)
351

Page 346

352

Page 347

4(i)(c)
LRB-2023-05
LRB-2023-05
22/01406/FLL – Change of use and alterations to store and
associated attic to form a dwellinghouse, 208b High Street,
Perth, PH1 5PA
REPRESENTATIONS
(part included in applicant’s submission, pages 343-350)
353

Page 348

354

Page 349

355

Page 350

356