Democracy Spraffa

Argyll and Bute Design Awards 2022/23

Argyll and Bute Council · 28 September 2022
Back to Planning, Protective Services and Licensing Committee — 28 September 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

ARGYLL AND BUTE COUNCIL       PLANNING, PROTECTIVE SERVICES &    
LICENSING COMMITTEE 
DEVELOPMENT AND ECONOMIC GROWTH              28 SEPTEMBER 2022 
ARGYLL AND BUTE DESIGN AWARDS 2022/23 
1.0 EXECUTIVE SUMMARY 
1.1 The purpose of this report is to invite Members to agree the proposal to facilitate
the relaunch of built environment Design Awards in 2022 which would run to
summer 2023. 
1.2 Argyll and Bute Council has successfully held three rounds of Design Awards over
the past ten years, the most recent being held in 2015. In January 2020 PPSL
agreed the launch of a further round of the competition as previously identified in
the Service Plan. The entry period was opened in early 2020 however the
competition was subsequently postponed due to Covid 19 restrictions. 
1.3 Design and sustainability are both recognised as being of important concerns
within Planning at both national level in the Scottish Planning Policy (SPP)
and within the Scottish Government’s Policy Document on Creating Places,
and at local level in the Local Development Plan (LDP). The Design Awards
seek to raise awareness of these issues and promote successful design in
Argyll and Bute. The Awards also recognise the significance of the Climate
Change Act and the council’s need to comply with this. 
1.4 It is recommended that:
 Members note and agree the content of this report which sets out the process
required to prepare for the postponed 2020 built environment design
competition to be relaunched in 2022.
 Members agree the inclusion of the Chair and Vice Chair as part of the judging
panel
 Members agree the proposed new Member’s Award as described.

Page 2

ARGYLL AND BUTE COUNCIL       PLANNING, PROTECTIVE SERVICES &    
LICENSING COMMITTEE 
DEVELOPMENT AND ECONOMIC GROWTH              28 SEPTEMBER 2022 
ARGYLL AND BUTE DESIGN AWARDS 2022/23 
2.0 INTRODUCTION 
2.1 The purpose of this report is to invite Members to agree the process required for
preparation of built environment Design Awards in 2022 and 2023.   
3.0 RECOMMENDATIONS 
3.1 It is recommended that:
 Members note and agree the content of this report which sets out the
process required to prepare for the postponed 2020 built environment
design competition to be relaunched in 2022.
 Members agree the inclusion of the Chair and Vice Chair as part of the
judging panel
 Members agree the proposed new Member’s Award as described. 
4.0 DETAIL 
4.1 Design and sustainability are both recognised as being of important concerns
within Planning at both national level in the Scottish Planning Policy (SPP)
and within the Scottish Government’s Policy Document on Creating Places,
and at local level in the Local Development Plan (LDP). These proposed
Design Awards seek to raise awareness of these issues and promote
successful design in Argyll and Bute. 
4.2 In previous years of this competition sustainability and design have been
considered together. However given the prominence of Climate Change as an
issue of concern and the Council’s need to comply with the Climate Change

Page 3

Act, it is proposed that sustainability be considered in its own right separately
from other aspects of design in order to ensure due regard is paid to this
significant issue. 
4.3 In January 2020 PPSL agreed the launch of a further round of the competition
as previously identified in the Service Plan. The entry period was opened in
early 2020 however the competition was subsequently postponed due to Covid
19 restrictions. Prior to the postponement, 9 entries were received and it is
proposed to seek agreement from the applicants to re-enter these without the
requirement for further submissions. 
4.4  It is proposed that a judging panel be formed of 2 Members from PPSL
(suggested that Chair and Vice Chair are appropriate) as well as 2 Council
Officers for each category. To ensure the most appropriate expertise in each
category Officers with knowledge of energy efficiency and Building Standards
will, along with 2 Members, judge the Sustainability category while Officers
with knowledge of design will be on the judging panel for the other categories. 
4.5  The proposed categories are:
 Sustainable design 
 Aesthetic design 
 Community Led Regeneration project  
 Built heritage 
 Design for under £100k 
 Members’ award
 Public Award 
It is anticipated that, in some cases, projects may be entered into more than
one category. 
4.6  The proposed timescale for key tasks is:
 October 2022 - 16 week entry period opens; promotion of Awards
 February 2023 – shortlisting
 March 2023 – People’s Choice voting period opens
 April 2023 – site visits; judging meeting
 June 2023 – Members’ Choice voting at  PPSL
 TBC - awards ceremony 
4.7  The Design Awards will be publicised via the website and a Press Release. In
order to ensure the event is widely publicised it is proposed that a mailshot be
sent to all Agents currently held in the Development Management database. 
4.8  It order to widen the involvement and engagement of Member’s beyond the

Page 4

proposed judging panel, in a practical manner, it is proposed that a Members’
Award be added to the 2020 Awards. Members would therefore be presented
with all the shortlisted entries from each category and allowed to vote for their
favorite project. One Members’ Award would be given which may or may not
be a project which has won one of the categories judged by the Panel. It is
proposed that a presentation of the shortlisted entries and a vote be included
as an additional session prior to PPSL Committee in summer 2023. 
4.9  In recognition of the importance of community involvement it is proposed that
members of the public be presented with the shortlisted entries from each
category online and be allowed to vote for their favorite project across the
categories. This may or may not be a project which has won one of the
categories judged by the Panel. 
5.0 CONCLUSION 
5.1 Design and sustainability are both recognised as being of important concerns
within Planning at both national level in the Scottish Planning Policy (SPP)
and within the Scottish Government’s Policy Document on Creating Places,
and at local level in the Local Development Plan (LDP). The proposed Design
Awards seek to raise awareness of these issues and promote successful
design in Argyll and Bute. The Awards also recognize the significance of the
Climate Change Act and the Council’s need to comply with this. 
6.0 IMPLICATIONS
6.1 Policy: None
6.2 Financial: modest costs for travel and trophies
6.3  Legal: None
6.4  HR: Officer and Member time
6.5  Fairer Scotland Duty: None
6.5.1   Equalities - protected characteristics: None
6.5.2   Socio-economic Duty: None
6.5.3 Islands: None
6.6. Risk: None
6.7  Customer Service: None
6.8 Climate Change: None

Page 5

Executive Director with responsibility for Development and Economic Growth:
Kirsty Flanagan
Policy Lead: Councillor Kieron Green
10th August 2022                                                  
For further information contact: 
Kim de Buiteléir – Design and Conservation Officer
Fergus Murray – Head of Development and Economic Growth 
APPENDICES
None