(b) Planning Decision Notice, Report of Handling and Reference Documents (Pages 25-50)
Perth and Kinross Council · 16 September 2024
Back to Local Review Body — 16 September 2024 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.
Page 1
4(i)(b) LRB-2024-29 LRB-2024-29 23/01987/FLL – Siting of ancillary accommodation unit (in retrospect), The Walled Garden, Garth, Fortingall, Aberfeldy, PH15 2NF PLANNING DECISION NOTICE REPORT OF HANDLING REFERENCE DOCUMENTS
Page 2
No embedded text on this page.
Page 3
No embedded text on this page.
Page 4
No embedded text on this page.
Page 5
No embedded text on this page.
Page 6
No embedded text on this page.
Page 7
No embedded text on this page.
Page 8
No embedded text on this page.
Page 9
No embedded text on this page.
Page 10
No embedded text on this page.
Page 11
No embedded text on this page.
Page 12
No embedded text on this page.
Page 13
No embedded text on this page.
Page 14
No embedded text on this page.
Page 15
No embedded text on this page.
Page 16
No embedded text on this page.
Page 17
No embedded text on this page.
Page 18
No embedded text on this page.
Page 19
No embedded text on this page.
Page 20
No embedded text on this page.
Page 21
No embedded text on this page.
Page 22
No embedded text on this page.
Page 23
No embedded text on this page.
Page 24
No embedded text on this page.
Page 25
Reference 100647026-003 Pigny – erecon of garden building (retrospecve) at The Walled Garden PH15 2NF PKC Leer 1st December 2023 Clarificaon on points 1 to 6 We await your advice on point 7 as the planning portal shows no fee due Points 1,2,3,5 & 6 Addional A3 document added – Locaon Plan: Pigny Site Plan ECOPOD MAP1 Addional A3 document added – Site Plan: Pigny Site Plan ECOPOD MAP2 Point 6 not applicable Scale bars, north point, boundaries outlined in red and canopy spread (photographic which we understand is acceptable/impossible to measure) shown on addional plans added. Map 2 shows three pictures of different scales to show site – the area of our garden that the Ecopod is sited on is grass, trees and bushes with our driveway up to our house to the right. Points 3 & 4 Hand drawing aached: The Ecopod is an open plan space 6m x 3m outside and height 2.5m. Layout/floor plans can vary. We have fied a small bathroom, a kitchenee, one double bed, one sofa. Hand drawing aached to scale 2cm:1m. Doors at front face East. Materials used to build the EcoPod by the supplier use “materials that naturally blend in with the surroundings”: metrole roof, double glazed Upvc door and window, 100mm insulaon, constructed from wood (larch). The EcoPod was chosen and sited with the environment and sustainability front of mind.
Page 26
No embedded text on this page.