Argyll and Bute Council 
Development and Economic Growth   
This Supplementary report is a recommended response to the Scottish Government’s
Energy Consents and Deployment Unit (ECDU) Section 36 consultation on Additional
Information received regarding the proposed Rowan wind farm on Land Approximately
4.5km North West of Tarbert, Argyll & Bute
_________________________________________________________________________ 
Reference No: 22/00385/S36 
Planning Hierarchy:  Electricity Act Section 36 consultation    
Applicant:  The Scottish Government on behalf of EnergieKontor UK Ltd 
Proposal: Electricity Act Section 36 consultation relevant to Rowan Wind Farm 
Site Address: Land Approximately 4.5km North West of Tarbert, Argyll & Bute 
________________________________________________________________________  
SUPPLEMENTARY REPORT NO. 1 
1. INTRODUCTION   
Since completion of the Report of Handling, correspondence has been received from the
Applicant, highlighting concerns that they have about the way the report deals with several
issues.  An error has also been identified by Officers on the title page. These matters are
addressed below. 
2. ERROR ON TITLE PAGE 
There is an editing error on the title page, which refers to Narachan wind farm, instead of
Rowan wind farm: 
“This report is a recommended response to the Scottish Government’s Energy Consents and
Deployment Unit (ECDU) Section 36 consultation regarding the proposed Narachan wind farm
on land east of Tayinloan, Argyll & Bute” 
This should read: 
“This report is a recommended response to the Scottish Government’s Energy Consents and
Deployment Unit (ECDU) Section 36 consultation regarding the proposed Rowan wind farm
on Land Approximately 4.5km North West of Tarbert, Argyll & Bute” 
Officers apologise for this error. 
3. APPLICANTS COMMENTS ON ERROR ON PAGE 19 OF PPSL REPORT 
An error has been identified by the Applicant on page 19 where it is stated that the turbines
are 277.5m tall: 
“Figure 3.2: Typical Turbine Elevations shows a hub height of 200m and a rotor diameter of
155m, this would give an overall height of 277.5m”.

Page 2

This is incorrect, the turbines would be 200m to blade tip.  Officers apologise for this editing
error and would confirm that this sentence should have been deleted from the report prior to
circulation.  The correct height is referenced throughout the remainder of the report. 
4. APPLICANT’S COMMENTS ON PROBLEM WITH HYPERLINK ON PAGE 29 OF PPSL
REPORT 
The Applicant has advised thaton page 29 of 45, a fundamental part of our case and really the
only point of contention – limited element of the southern shore of WLT, the response to the
Council’s Landscape Consultant and the updated ZTV and sequential assessment does not
work as a hyperlink. 
In the interests of balance the Applicant has asked that their written response is replicated in
full (as the Council’s landscape consultant’s has been) within the Committee Report to provide
the Committee with full context and for them to decide which assessment they prefer.  The
Applicant has advised that if the Committee do not have clear and urgent sight of their written
response either (preferably) replicated in full to mirror the treatment of the Council’s landscape
consultant, or with a direct working link, they would have significant concerns. 
The link to this document worked in the final draft of the report, however, having checked it is
correct that it does not appear to be working on the Agenda Reports pack. Rather than provide
another link, which may or may not work, the full response may be found at Appendix 2 to this
Supplementary Report as requested by the Applicant.  To assist Members further – for ease
of reference, the Council’s landscape consultant’s responses are also included at Appendices
1 and 3. It should be noted that all documents/figures referred to in these responses are
available to view on the ECU website.  The Applicant notes that this could be dealt with by
Supplementary Report but they have concerns about the amount of time Councillors will have
to fully digest this information. 
5. AVIATION 
Whilst the Applicant notes that the Council has stated this objection would be lifted should the
aviation objections be removed, they think it’s important to note within the reasons for objection
themselves that this is a technical matter which will be resolved via the ECU (all parties are
confident of resolution) and is essentially a procedural objection from the Council at this stage. 
This is not clear enough to the Applicant and they are concerned it would give Councillors the
wrong impression.  The Applicant notes this could be dealt with by Supplementary Report but
they have concerns over the timing of this. 
The Applicant has today (22nd September) copied Officers into further correspondence sent
by them to Glasgow Prestwick Airport, with the aim of resolving their outstanding objection. 
This should be available to view on the ECU website and does not alter Officers
recommendation on this proposal.  Officers also note the Applicant’s opinion on the structure
of Officers reasons for objection. There is a paragraph underneath the reason for objection
which makes the Council’s position quite clear, Officers do not consider that this requires to
be changed.  The relevant paragraph is as follows: 
“Argyll & Bute Council therefore object to the proposal due to the adverse impact it would have
on Aviation.  The Energy Consents Unit should please note that in the event that National Air
Traffic Services (NATS) and Glasgow Prestwick Airport withdraw their objections, then Argyll
& Bute Council would no longer object on these grounds.  Should these objections not be
removed and the proposal progresses to an Inquiry, Argyll & Bute Council would defer to
National Air Traffic Services and Glasgow Prestwick Airport as the Technical Experts on this
matter”

Page 3

6. PLANNING BALANCE 
The Applicant has significant concerns that a planning balance against material considerations
has not been fully considered and particularly in respect of SPP para 33.  This does not give
them confidence that Councillors are being presented with the full picture i.e. limited visual
effects versus multiple benefits – there is no evidence from the Council to suggest harm
demonstrably outweighs benefits.  The Applicant says this in the context that they would see
this as being in their favour at PLI – however, their aim is to maintain positive relationships
with the Council and avoid PLI unless absolutely required.  A response from Officers is
provided below in respect to these concerns, 
Paragraph 33 of SPP 
The Applicant considers that the ‘tilted balance’ in favour of sustainable development applies
in relation to this proposal, given that the Local Development Plan is greater than 5 years old. 
Paragraph 33 states: 
“Where relevant policies in a development plan are out-of-date or the plan does not contain
policies relevant to the proposal, then the presumption in favour of development that
contributes to sustainable development will be a significant material consideration. Decision-
makers should also take into account any adverse impacts which would significantly and
demonstrably outweigh the benefits when assessed against the wider policies in this SPP.
The same principle should be applied where a development plan is more than five years old”. 
Officers note that para 33 starts “where relevant policies in a development plan are out of
date”, however, this is normally applied to policies on housing or industrial land supply, where
LDP’s make specific allocations to cover specified periods of time.   The policy on renewables
in LDP1 and its Supplementary Guidance do not relate to a specific period of time, and are
consistent with SPP 2014 this being the Scottish Government’s most up to date expression of
planning policy,  and therefore it is considered that the relevant policies are not out of date.   
Additionally, the proposed replacement Local Development Plan 2 is currently at examination,
and it is anticipated that the Reporters’ recommendations will be received in the next few
months, the Council could therefore be in a position to Adopt LDP2 in the first quarter of 2023. 
Policy 30 in pLDP2 – The Sustainable Growth of Renewables, is essentially the same a Policy
LDP 6 in the Adopted LDP, and while this policy is subject to examination, it is consistent with
SPP 2014, and reflective of the emerging policy on renewables in the draft NPF4.   
There is close alignment between the policy established by the Council’s Local Development
Plan and the expression of government policy in SPP.  These policies are underpinned by the
over-riding imperative to secure sustainable economic development. The Report of Handling
provides an assessment of the proposal against each of the key considerations identified in
Policy LDP6 and Para 169 of SPP.   
Onshore wind is recognised as being a key component in the aim to increase renewable
energy generation.  However, where the Applicant has failed to adequately demonstrate that
there would be no unacceptable significant adverse effects, whether individual or cumulative,
including those on landscape character and visual amenity, the proposal will not benefit from
support in terms of the presumption in favour of sustainable development afforded by Policy
LDP 6, or SPP. 
Paragraph 28 of SPP 
The SPP introduced a presumption in favour of development that contributes to sustainable
development.   Paragraph 28 states:

Page 4

“The planning system should support economically, environmentally and socially sustainable
places by enabling development that balances the costs and benefits of a proposal over the
longer term.  The aim is to achieve the right development in the right place; it is not to allow
development at any cost”. 
It is considered by Officers that this proposal is not capable of contributing towards
‘sustainable development’.  The significant adverse impacts it poses in terms of landscape
and visual impact cannot be considered ‘sustainable’. It is considered that these adverse
effects outweigh any benefits the proposal could bring.  Officers therefore submit that there
can be no presumption in favour of this development in terms of this paragraph of SPP either. 
Officers do not consider that the proposed development is located in the right place – a view
which is supported by the Council’s landscape consultant and also the statutory consultation
advice of NatureScot. 
In reaching the recommendation to object to this proposal, Officers have had regard to:
relevant National and Local Policy and guidance; the EIAR and other supporting documents;
the advice of key consultees; and the material consideration raised in the representations.   It
has been concluded that notwithstanding those factors which weigh positively in the balance
of considerations, the significant adverse Landscape and Visual Impact would significantly
and demonstrably outweigh the benefits of the development and would therefore be
unacceptable.  As referred to above “the aim is to achieve the right development in the right
place”, there is not a policy expectation that an adverse impact on the local environment
should be accepted as the price to pay for the ability to satisfy Scotland’s energy needs and
UK climate change commitments.  The natural environment also requires to be seen as a finite
resource worthy of protection.   
6. LIGHTING EFFECTS 
Another point raised by the Applicant is that the bullets above the link on p29 of the Report of
Handling should be updated to reflect conversations between the Applicant around Clachaig
Glen night time visuals where Councillors should not be comparing two schemes without a
detailed technical note or clear view from the Council as which to prefer and why – the
Applicant considers that Officers were in verbal agreement not to include this point last week.   
In this case, and as the Applicant highlighted in their rebuttal to the advice of the Council’s
landscape consultant, there is no evidence or justification provided by the Council or the
Council’s landscape consultant to suggest that they are underplaying effects and unless there
is, the Applicant does not think it is reasonable or fair to ask Councillors to make that
judgement.  The Applicant does not accept a comparison against Clachaig Glen without
evidence, and have issue with this being presented in the report. 
Verbal agreement between the Applicant and Officers related to the exclusion of the Clachaig
Glen night time visualisation from the Councillor Packs.  The reason being that the Applicant
did not wish to include them for the reasons detailed above.  It did not relate to the Report of
Handling.  It is the expert opinion of the Council’s landscape consultant, and it is not
considered that this should be disregarded.   
7. APPLICANT’S CONCLUSION 
In light of the above the Applicant feels that there are a number of items which require some
time for both the Council and the Councillors to consider, accordingly they do not have comfort
that this will be possible with sufficient time before next week’s Planning Committee. 
Therefore they have respectfully requested that the determination at Committee is delayed
until October 2022 to allow these matters to be sufficiently addressed.

Page 5

8. OVERALL CONCLUSION & RECOMMENDATION   
In light of all of the above, Officers recommendation remains the same that the Council should
object to this proposal for the reasons detailed in the Report of Handling. 
Should Members share the Applicant’s concerns that they have not had sufficient time to
consider the supporting documents, then they may wish to consider deferring consideration of
the proposal until a later date.  
Author of Report: Arlene Knox       Date: 22nd  September 2022 
Reviewing Officer: Sandra Davies     Date: 23rd September 2022   
Fergus Murray  
Head of Development and Economic Growth

Page 6

APPENDIX 1: LANDSCAPE AND VISUAL REVIEW, CAROL ANDERSON LANDSCAPE
ASSOCIATES, REVISED JUNE 2022

Page 7

No embedded text on this page.

Page 8

No embedded text on this page.

Page 9

No embedded text on this page.

Page 10

No embedded text on this page.

Page 11

No embedded text on this page.

Page 12

No embedded text on this page.

Page 13

No embedded text on this page.

Page 14

No embedded text on this page.

Page 15

No embedded text on this page.

Page 16

APPENDIX 2: RESPONSE TO COUNCIL’S LANDSCAPE OPINION

Page 17

No embedded text on this page.

Page 18

No embedded text on this page.

Page 19

No embedded text on this page.

Page 20

No embedded text on this page.

Page 21

No embedded text on this page.

Page 22

No embedded text on this page.

Page 23

No embedded text on this page.

Page 24

No embedded text on this page.

Page 25

No embedded text on this page.

Page 26

No embedded text on this page.

Page 27

No embedded text on this page.

Page 28

No embedded text on this page.

Page 29

No embedded text on this page.

Page 30

No embedded text on this page.

Page 31

APPENDIX 3: COMMENTS ON APPLICANT’S RESPONSE TO THE LANDSCAPE AND
VISUAL REVIEW UNDERTAKEN BY THE COUNCIL’A LANDSCAPE CONSULTANT,
JUNE 2022

Page 32

No embedded text on this page.