Argyll and Bute Council
Development & Economic Growth 
This report is a recommended response to the Scottish Government’s Energy Consents
and Deployment Unit (ECDU) Section 36 consultation regarding the proposed Narachan
wind farm on land east of Tayinloan, Argyll & Bute 
Reference No: 22/00385/S36/ECU00003230
Applicant: The Scottish Government on behalf of EnergieKontor UK Ltd
Proposal: Electricity Act Section 36 consultation relevant to Rowan Wind Farm
Site Address: Land Approximately 4.5km North West of Tarbert, Argyll & Bute 
(A) Section 36 application made up of the following elements: 
 Construction, 35 year operation and subsequent decommissioning, of up to 13
wind turbines with a tip height of up to 200m (approximately 85.8MW)
 Associated turbine compound areas including foundations and hardstanding areas
for erecting cranes at each turbine location
 On-site tracks connecting each turbine 
 A new graded access junction with the B8024
 New pedestrian, cyclist and recreational use of the wind farms tracks following
commissioning of the wind farm, and associated facilities including 10-vehicle
informal car park, interpretive boards, benches and bins
 Ten new watercourse crossings 
 On-site 132kv substation to provide ‘tee-in’ to the Inveraray to Crossaig overhead
line
 Underground cables linking the turbines to the substation, typically along internal
tracks 
 An Energy Storage Compound to store batteries to a 5MW capacity which would
be within the construction compound footprint 
 Up to two borrow pits for the extraction of stone on-site 
 A temporary construction compound including provision for onsite concrete
batching 
 Forestry felling and restocking 
 Habitat Management provisions 
The proposed development will use the Inveraray to Crossaig Overhead Line to
connect to the grid, which passes to the eastern edge of the application site. This
connection is subject to a separate application as details would be agreed following
consent of the main wind farm.
_________________________________________________________________________
(B) RECOMMENDATION: 
It is recommended that the Council as Planning Authority objects to this
proposal for the reasons detailed below, and that the Scottish Government be
notified accordingly.  Members should note that an objection from the Council
will instigate the requirement for a Public Local Inquiry to be held. 
___________________________________________________________________

Page 2

(C) CONSULTATIONS: 
ENERGY CONSENT UNIT RESPONSES: 
NatureScot (17th June 2022) – advised the ECU that the Proposal does not raise
issues of National Interest, however NatureScot summarise the key considerations to
be: Landscape and visual effects, including cumulative effects and night time effects;
Construction effects on the Glen Ralloch to Baravalla Woods Site of Special Scientific
Interest (SSSI) / Tarbert Woods SAC (Special Area of Conservation); and Operational
effects on Schedule 1 birds, predominately ospreys and red-throated divers.
NatureScot also provide advice on landscape, ecology and ornithology. 
NatureScot response to the Applicant’s Technical Note (Gavia Environmental) 
regarding curtailment of Turbine 4 (27th July 2022) – have advised the ECU that 
they have considered the Technical Note on the proposed curtailment of Turbine 4 
(T4) in order to minimise collision risk for ospreys and red-throated divers. 
NatureScot welcome the Applicant’s commitment to curtail the operation of T4 so 
that it only operates between sunset and sunrise, thereby  avoiding the more 
sensitive daylight hours when these species are likely to be feeding and commuting 
between hill lochs and West Loch Tarbert.  NatureScot also advise that they would 
be happy to discuss possible monitoring of the effects of curtailment as part of any 
post consent discussions. 
Transport Scotland (TS) (14th April 2022) – have advised the ECU that they have no
objection.  TS request that conditions are attached in the event that the proposal
receives consent relating to: Construction Traffic Management Plan (CTMP) and
Phased Delivery Plan; Road Condition Review/Assessment; Abnormal Indivisible
Loads Management Plan; vehicles transporting construction material are sheeted;
vehicle wheel cleaning facilities; abnormal load delivery trial-run; approval of the
proposed route for abnormal loads and any accommodation measures; details of any
additional signing or temporary traffic control measures deemed necessary (by Quality
Assured traffic management consultant); and a Decommissioning Plan. 
Scottish Forestry (SF) (31st March 2022) – advised the ECU that they had insufficient
information to recommend that the proposal meets the requirements of UKFS.
Additional information is required to allow Scottish Forestry to confirm that the proposal
for restocking meets UKFS. Planning conditions to secure Compensatory Planting and
a Long Term Forest Plan in the event the proposal receives consent are also
recommended. 
Scottish Forestry (SF) consultation response to Applicant’s clarification (29th
June 2022) – advised the ECU that they are content that the proposal meets the UKFS
species diversity requirements and confirm that they have no outstanding issues with
the proposal. Planning conditions to secure Compensatory Planting and a Long Term
Forest Plan in the event the proposal receives consent are also recommended. 
Scottish Environment Protection Agency (SEPA) (9th March 2022) – have advised
the ECU that they have reviewed the information supplied with the application,
including the EIAR, and have found it to be insufficient to allow them to determine the
potential impacts.  SEPA therefore submit a holding objection and request that
determination be deferred until further information is provided regarding private water
supplies (PWS).  SEPA will review this position if these issues are adequately
addressed.  SEPA also request that if the ECU are minded to grant consent that
conditions are attached relating to: micrositing; an updated Peat Management Plan;
and water crossings.

Page 3

Scottish Environment Protection Agency (SEPA) (4th May 2022) – have advised
the ECU that having considered the Rowan Wind Farm – Review of Private Water
Supplies (dated 15 April 2022) prepared by Ramand Environmental they remove their
holding objection regarding private water supplies.  SEPA continue to request that if
the ECU are minded to grant consent that conditions are attached relating to:
micrositing; an updated Peat Management Plan; and water crossings. 
Historic Environment Scotland (HES) (30th March 2022) – have advised the ECU
that they have no objection to this proposal. 
Ironside Farrar (Environmental Consultants on behalf of Scottish Government
ECU to audit Peat Landslide Hazard Risk Assessment (PLHRA)) (26th April 2022)
– advised the ECU that the PLHRA requires minor revisions: although much of the
PLHRA is sound, one or two key elements are considered to be insufficiently robust to
support the PLHRA conclusions and minor revisions are required; areas for attention
will be advised in the review findings and may be progressed by the developer through
either an appendix to the original submission or by clarification letter. 
BT (1st March 2022) – have advised the ECU that they have no objection to the
proposal. 
Defence Infrastructure Organisation/ Ministry of Defence (MOD) (2nd March 2022)
– advised the ECU that they have no objection subject to conditions to secure: aviation
lighting and aviation charting & safety management. 
Joint Radio Company Limited (16th May 2022) – advised the ECU they have no
objection to the proposal, subject to 30m micrositing. 
Fisheries Management Scotland (FMS) (28th February 2022) – advised the ECU that
their remit is confined to alerting the relevant local DSFB/Trust to any proposal. The
proposal falls within the catchment relating to the Argyll DSFB and the Argyll Fisheries
Trust. The proposals should be conducted in full consultation with the local DSFB &
Trust. Due to the potential for such developments to impact on migratory fish species
and the fisheries they support, FMS have developed, in conjunction with Marine
Scotland Science, advice on terrestrial wind farms for DSFBs and Trusts in dealing
with planning applications which should be fully considered. 
Argyll District Salmon Fishery Board (7th March 2022) – advised the ECU that they
have no objection subject to conditions to ensure: comprehensive pre and post
development monitoring (electrofishing surveys of juvenile fish populations) is
undertaken to ensure Argyll DSFB that all habitat and fish populations are unaffected
by the development; as part of any development, all conifer trees are to be removed
from riverbanks and measures taken to regenerate native broadleaf trees; and all
stream crossings are conducive to the upstream and downstream movement of all fish. 
RSPB Scotland (29th April 2022) - has advised the ECU that it does not object to this
proposal but provides advice, in relation to biodiversity and habitat management to
minimise and ensure any impacts are fully mitigated and that biodiversity benefits are
achieved. RSPB ask that conditions to secure: a Bird Protection Plan; Habitat
Management Plan; an appropriately qualified and experienced Ecological Clerk of
Works (ECoW); and, an appropriate programme of post-construction monitoring are
attached to any consent.

Page 4

Scottish Water (25th February 2022) – advised the ECU that they do not object and
advise that this does not confirm the proposal can be serviced.  Advice is provided on:
drinking water protected areas and surface water. 
Glasgow Prestwick Airport (GPA) (5th April 2022) – advise the ECU that the
development raises aviation safety concerns which have an operational impact on the
Airport as an air navigation services provider. Until all technical and operational
aviation safety matters are addressed to the satisfaction of the Airport, and a mitigation
agreement is put in place for the life of the windfarm, the Airport must object to this
proposed development 
Glasgow Prestwick Airport – further comments in response to Applicant’s 12th
May email (9th September 2022) – advise the ECU that they continue to object to this
proposal.  They continue to have concern in regard to: airspace, airport surveillance
coverage and air traffic service; air space and air traffic control; in the absence of
appropriate mitigation the turbines visible to the airport’s primary surveillance will
generate clutter and render the airspace above the wind farm unusable to Air Traffic
Control; further wind farms without appropriate mitigation will exacerbate this; and  the
turbines are capable of impacting VHF reception from ATV to aircraft, the airport
requires to be satisfied that the proposal will not have an adverse impact upon VHF
communication infrastructure (further analysis required). GPA is optimistic that
appropriate mitigation of these effects will be possible and that an agreement can be
reached with the Applicant in respect of mitigation measures, which would allow GPA
to withdraw its objection. 
Glasgow Airport (23rd February 2022) - Have advised the ECU that the proposed
development has been examined from an aerodrome safeguarding perspective and
does not conflict with safeguarding criteria. They, therefore, have no objection to this
proposal. 
Edinburgh Airport (28th February 2022) – have advised the ECU that the location of
this development falls out with the Aerodrome Safeguarding zone for Edinburgh Airport
they have no objection/comment. 
National Air Traffic Services Safeguarding (NATS) (18th February 2022) – have
advised the ECU that the proposed development has been examined by their technical
safeguarding teams and conflicts with their safeguarding criteria.  Accordingly, NATS
(En Route) plc objects to the proposal.  The reasons for NAT’s objection is that a
technical impact is anticipated, which has been deemed to be unacceptable. 
Highlands and Islands Airports Limited (HIAL) (22nd March 2022) - advise the ECU 
that at the given position, this development is in the vicinity of the Instrument Flight 
Procedures of both Islay and Campbeltown Airports. However, their calculations 
show that there is no impact to the safeguarding criteria for Islay and Campbeltown 
Airports. If the proposed layout of the wind farm does not significantly change and the 
maximum height, 200m, of the proposed wind turbines does not increase; Highlands 
and Islands Airports Limited has no objections to this proposal. However, if the layout 
changes significantly and the turbine height increases then Highlands and Islands Ltd 
would object until it is determined that there is no impact to the IFPs of Islay and 
Campbeltown Airport. 
Civil Aviation Authority (17th February 2022) – advised the ECU that the proposed
development has 13 turbines, with turbine heights at 200m ground to tip. This brings
them into scope of the Air Navigation Order Article 222 requirements for obstacle

Page 5

lighting at night. Based on the information, the CAA is satisfied with the proposed
lighting scheme, 
Crown Estate Scotland (12th May 2022) – have advised the ECU that the assets of
Crown Estate Scotland are not affected by this proposal and they have no comments
to make. 
North Ayrshire Council (23rd May 22) – have advised the ECU that in this instance,
they leave the comments relating to impacts on North Arran NSA and the Wild Land
Area to NatureScot. 
West Kintyre Community Council (WKCC) (10th May 2022) – have submitted an
objection to the ECU on the grounds of: Landscape and Visual Impact; and Tourism
Impact. 
Tarbert & Skipness Community Council (TSCC) (30th May 2022) – have advised 
the ECU that they object to the proposal on the grounds that the proposal will have an 
adverse landscape and visual impact and adverse tourism impact. 
South Knapdale Community Council (SKCC) (21st June 2022) – have advised the 
ECU that whilst SKCC shall not be making formal comment, SKCC remains neutral 
on this  matter. 
East Kintyre Community Council (28th February 2022) – have advised the ECU that 
they object to the proposal on the following  grounds: a) Visual Amenity due to 
cumulative harmful visual impacts contrary to Argyll & Bute Council’s LDP 6 and 
Proposed Local Development Plan 2 Diagram 7. b)  Community Development 
Amenity due to the wholesale harmful impacts to a  designated Tourism development 
area 
ARGYLL & BUTE COUNCIL RESPONSES 
ABC Landscape Consultant Review (April 2022) – it is recommended  that this 
proposal should be objected to on landscape and visual grounds principally 
because of its prominent location in relation to West Loch Tarbert and its sensitive 
coastal fringes, including impacts on views from key transport routes which are 
important for visitors. 
ABC Landscape Consultant response to Applicant’s rebuttal (June 22)  – 
concludes that it is acknowledged that all wind farms will have significant adverse 
landscape and visual impacts but what is important to consider is the nature and 
degree of severity of these effects in making recommendations to the Council.  The 
LV Review provides an impartial analysis of likely significant adverse landscape and 
visual effects but also the mitigating features of the proposal are clearly noted, for 
example the limited visibility of turbines in views from the east across Loch Fyne. It is 
not appropriate for the Applicant to determine the acceptability of the proposal in 
landscape and visual  terms as this can only be determined by the decision maker (the 
Council in this instance) upon receipt of the full range of information which needs to be 
considered in the planning judgement. 
ABC Area Roads (21st March 2022) – no objection subject to conditions to secure: a
Traffic Management Plan; a detailed Method Statement; new passing places;
carriageway widening; carriageway widening to be soiled and seeded; report
identifying vulnerable areas of road to traffic loading (including assessment of culverts
or other structures and proposed mitigation); and a detailed roads condition survey;

Page 6

weekly road inspections.  Furthermore, the Applicant should be made aware that there
will be no financial contributions from Argyll & Bute Council towards the work required
to facilitate the works or to make good any damage directly attributable to the
construction of the wind farm. The Applicant should be made aware that they will be
responsible for making good any damage to the public roads which is directly
attributable to the construction of the wind farm. Transport Scotland should be notified
as there may be work to be carried out within the road corridor of the A83 Tarbet –
Campbeltown Trunk Road. Conditions.  A section 96 Legal Agreement will be required.
The Roads Engineer has also highlighted the following notes for intimation to the
Applicant: in terms of the Roads (Scotland) Act 1984 a Road Opening Permit (S56)
will be required, and no surface water is allowed to discharge onto the public road. 
ABC Environmental Health (13th March 2020) – no objection subject to conditions
relating to: noise during proposed works; site noise plans; noise immissions; report
demonstrating compliance with noise limits; complaints & independent noise
monitoring; provision of independent consultants assessment; logging of wind speed,
wind direction and power generation data; nominated representative/point of contact
for local residents for noise complaints; and provision of a private water supply action
plan. 
ABC Flood Risk Assessor (23rd May 2022) - No objection subject to conditions to
ensure that: watercourse crossings not to reduce the capacity of the channel and
ideally be designed to convey the 1:200 year plus climate change flow; and Surface
water drainage should be designed in accordance with CIRIA C753 and ensure that
post development surface water runoff does not exceed the pre-development surface
water runoff. The surface water drainage should be in operation prior to the start of
construction. 
ABC Local Biodiversity Officer (22nd March 2022) -  no objection, advice provided in
relation to biodiversity interest, surveys, mitigation, construction environment
management and overseeing, habitat management and restoration protocols.  The
Local Biodiversity Officer recommends monitoring of the condition of the structures
(culverts/bridge), that silt catchment measures are effective and that a log of any
incidents of contamination are kept.  The Local Biodiversity Officer requests that: an
ornithological watching brief is kept and any collisions are recorded and submitted to
NatureScot, the planning authority and the RSPB; and the applicant drafts an
eradication plans for the following species: Japanese knotweed rhododendron;
montbretia; and butterfly bush and submits it to the planning authority as this supports
biodiversity enhancements. 
The West of Scotland Archaeology Service (WOSAS) (6th April 2022) – No objection
subject to condition to secure the approval of a written scheme of archaeological
investigation, to be fully implemented to the satisfaction of the Planning Authority. 
Please note: the above are summaries and the full consultee responses can be
viewed on the Energy Consent Unit and Argyll & Bute Council websites.
___________________________________________________________________
(C) REPRESENTATIONS: 
As the Council is not the determining Authority all letters of representation are
considered by the Energy Consents Unit.  At time of writing, public representation
figures stand at 10 of which 3 are objections and 7 are in support, all of which are
published on the ECU website. The main issues raised are summarised below:

Page 7

Material Considerations raised in the objections are summarised as follows: 
 Adverse Landscape Impact – It is the landscape of Kintyre and Knapdale which
represents the area's future economic wellbeing. Wind farms, new power lines and
the miles of tracks they seem to need are destroying the landscape and the special
feel of remoteness of the area. They contribute almost nothing to anyone locally
but do enrich landowners who almost all live elsewhere. Visitors to the area cannot
understand the lack of value accorded the special quality of the area. When it is
gone perhaps some of those involved in its destruction may come to appreciate
what they have done? 
 Adverse Visual Impact – view north along West Loch Tarbert from Gartnagrenach
(special often photographed and commented on by visitors and enjoyed by locals).
This proposal would be visible from very many places especially in Kintyre and
especially from Gartnagrenach. 
 Adverse Impact on Tourism & Recreation and associated economic impact - this
application would be directly in front of Tarbert Holiday Park which extends to 50
acres. It is also close to West loch Shores and Escart Farm and Bay (200 acres
approx). We are the biggest accommodation provider in Kintyre and the landscape
is what attracts people to this particular area close to Tarbert. There seems to be
a lot of further Wind farms proposed but I feel this one is one too many and too
close to us. It will also significantly financially affect the future income of the
businesses.   
 Adverse Noise Impact on Mullach Glas (already experiencing adverse noise impact
from SSEN development) 
 Adverse Impact of Access Road/public footpath on the property Mullach Glas 
 Adverse Cumulative Impact of SSENs 50m pylons and proposed wind farm on
Mullach Glas 
 Lack of public consultation/notification with/for neighbouring properties (including
Mullach Glas) 
 Loss of privacy for Mullach Glas – construction of new access road, wind farm
construction following on from SSEN pylons. 
 Planning permission already granted to Rowan wind farm for temporary mast with
no neighbour notification, despite site area bordering Mullach Glas 
 Should be a matter for Public Inquiry before any consent is awarded. 
 Adverse Impact on Visual/residential Amenity of Mullach Glas 
 Intermittent technology - The amounts of intermittent power that would be produced
is small compared with the output of a new nuclear power station at Hunterston. It
would be able to produce power 24 hours a day, seven days a week not now and
then. 
Considerations raised in support are summarised as follows:

Page 8

 Climate Emergency & Climate Change benefits (including need for renewable
energy) 
 The Government have publicised a substantial further need for new wind farms in
the right places by 2030. 
 Whilst there are other wind farm schemes in Argyll & Bute, the Applicant has
demonstrated that another wind farm can be accommodated in this location 
 It does not detract from the wider scenic nature of the area; it is a key part of our
future that brings benefits to the immediate community as well as 85MW of clean
energy to be used across Scotland. 
 An opportunity for local contractors - the opportunity to tender for work in
construction which supports local economies. 
 Whilst perhaps not every wind farm is well placed, it is our view that this wind farm
brings more benefits than harm to our local area. 
 Expansion of Renewable Energy required to meet Net Zero targets 
The following matter raised in representations is not a material planning consideration: 
 Community Benefit 
Public Consultation – Whilst not a statutory requirement for Section 36 applications, the
applicant has undertaken Public Consultation. Further information on this is contained in
the Pre-Application Consultation Report (January 2022) which is available on the ECU
website (reference: ECU00003230). 
Note: the comments raised above are addressed in the assessment of the proposal at
Appendix A of this report. 
Note: please note that the letters of representation above have been summarised
and that the full letters of representations are available on the Energy Consents
Units website. 
___________________________________________________________________ 
(E) SUPPORTING INFORMATION 
Has the application been the subject of: 
i) Environmental Impact Assessment Report (EIAR): Yes 
EIAR (December 2021) presented in 4 volumes:   
 Volume 1: Written Statement
 Volume 2: Figures 
 Volume 3: Visualisations
 Volume 4: Technical Appendices

Page 9

Key matters covered in the EIAR include: Introduction; EIA Methodology; Project
Description; Design Evolution; Renewable Energy & Planning Policy; Landscape &
Visual; Socio-economics & Tourism; Ecology; Ornithology; Hydrology, Hydrogeology,
Geology and Peat; Cultural Heritage; Noise; Traffic and Transport; Forestry; Other
Issues; and Schedule of Mitigation. 
The EIA Report should also be read in context with the following documents: 
 EIA Non-Technical Summary (NTS) 
 Planning Statement 
 Pre-Application Consultation Report (PAC Report)
 Design and Access Statement (DAS) which illustrates the approach to design
and access. 
ii) An appropriate assessment under the Conservation (Natural Habitats)
Regulations 1994:   Yes – as NatureScot has advised that this Proposal is likely to
have a significant effect on the western acidic oak woodland feature of the Tarbert
Woods SAC.  This will be undertaken by the ECU as the Determining Authority in this
case. 
iii) A design or design/access statement:   Yes (January 22) 
iv) A report on the impact of the proposed development e.g. Retail impact, transport
impact, noise impact, flood risk, drainage impact etc.: All relevant reports are
encompassed within the EIAR 
(F) Local Development Plan (LDP) and any other material considerations over and
above those listed above which have been taken into account in the assessment
of the application: 
Members are asked to note in the context of the Local Development Plan (LDP) and
planning process that this application has been submitted to the Scottish Government
under Section 36 (S36) of the Electricity Act 1989.  As part of the S36 application
process, the applicant is also seeking that the Scottish Ministers issue a Direction under
Section 57 (2) of the Town and Country Planning (Scotland) Act 1997 that deemed
planning permission be granted for the proposal.  In such instances, the LDP is not the
starting point for consideration of S36 applications, as Sections 25 and 37 of the Town
and Country Planning (Scotland) Act 1997 which establish the primacy of LDP policy in
decision-making, are not engaged in the deemed consent process associated with
Electricity Act applications.  Nonetheless, the adopted Argyll & Bute LDP 2015 still
remains an important material consideration informing the Council’s response to the
proposal. 
Schedule 9 of the Electricity Act does require both the applicant and the decision-maker
to have regard to the preservation of amenity.  It requires that in the formulation of
proposals the prospective developer shall have regard to: 
(a) the desirability of preserving natural beauty, of conserving flora, fauna and geological
or physiological features of special interest and of protecting sites, buildings and objects
of architectural, historic or archaeological interest; and

Page 10

(b) shall do what he reasonably can to mitigate any effect which the proposals would
have on the natural beauty of the countryside or on any such flora, fauna, features, sites,
buildings or objects. 
Similarly, it obliges the Scottish Ministers in their capacity as decision maker to have
regard to the desirability of the matters at a) and the extent to which the applicant has
complied with the duty at b).  Consideration of the proposal against both the effect of
SPP (2014) and the adopted Argyll & Bute LDP 2015 will ensure that proper
consideration is given by the Council to the extent which the proposal satisfies these
Schedule 9 duties. 
(i) List of all Development Plan Policy considerations taken into account in
assessment of the application. 
Argyll & Bute Local Development Plan (2015) 
LDP STRAT 1 – Sustainable Development
LDP DM1 – Development within the Development Management Zones
LDP 3 – Supporting the Protection, Conservation and Enhancement of our
Environment
LDP 5 – Supporting the Sustainable Growth of Our Economy 
LDP 6 - Supporting the Sustainable Growth of Renewables 
LDP 8 – Supporting the Strength of Our Communities
LDP 9 – Development Setting, Layout and Design
LDP 10 – Maximising our Resources and Reducing our Consumption
LDP 11 – Improving our Connectivity and Infrastructure 
Supplementary Guidance to the Argyll & Bute Local Development Plan 2015 & 2016 
SG LDP ENV 1 – Development Impact on Habitats, Species and Our Biodiversity (i.e.
biological diversity)
SG LDP ENV 2 – Development Impact on European Sites 
SG LDP ENV 4 – Development Impact on Sites of Special Scientific Interest (SSSIs)
and National Nature Reserves 
SG LDP ENV 5 – Development Impact on Local Nature Conservation Sites (LNCS) 
SG LDP ENV 6 – Development Impact on Trees / Woodland
SG LDP ENV 7 – Water Quality and the Environment
SG LDP ENV 9 – Development Impact on Areas of Wild Land 
SG LDP ENV 11 – Protection of Soil and Peat Resources
SG LDP ENV 12 – Development Impact on National Scenic Areas (NSAs) 
SG LDP ENV 13 – Development Impact on Areas of Panoramic Quality (APQs)
SG LDP ENV 14 –Landscape
SG LDP ENV 15 –Development Impact on Historic Gardens and Designed
Landscapes 
SG LDP ENV 16(a) – Development Impact on Listed Buildings 
SG LDP ENV 19 – Development Impact on Scheduled Monuments 
SG LDP ENV 20 – Development Impact on Sites of Archaeological Importance
SG LDP MIN 2 – Mineral Extraction 
SG LDP PG 1 – Planning Gain
SG LDP BAD 1 – Bad Neighbour Development
SG LDP Sustainable - Sustainable Siting and Design Principles 
SG LDP SERV 1 – Private Sewage Treatment Plants and Wastewater (i.e. drainage)
Systems 
SG LDP SERV 2 – Incorporation of Natural Features / Sustainable Systems (SUDS) 
SG LDP SERV 3 – Drainage Impact Assessment (DIA)

Page 11

SG LDP SERV 5 – Waste Related Development and Waste Management 
SG LDP SERV 5(b) – Provision of Waste Storage and Collection Facilities within New
Development 
SG LDP SERV 6 – Private Water Supplies and Water Conservation
SG LDP SERV 7 – Flooding and Land Erosion – The Risk Framework for Development
SG LDP TRAN 1 – Access to the Outdoors
SG LDP TRAN 2 - Development and Public Transport Accessibility
SG LDP TRAN 4 – New and Existing, Public Roads and Private Access Regimes
SG LDP TRAN 6 –Vehicle Parking Provision 
SG LDP TRAN 7 –Safeguarding of Airports
SG LDP REC/COM 1 - Safeguarding and Promotion of Sport, Leisure, Recreation,
Open Space and Key Rural Services
Supplementary Guidance 2 (December 2016)
Supplementary Guidance 2 - Windfarm map 1
Supplementary Guidance 2 - Windfarm map 2 
Note: The above supplementary guidance has been approved by the Scottish
Government. It therefore constitutes adopted policy and the Full Policies are
available to view on the Council’s Web Site at www.argyll-bute.gov.uk 
(ii) List of other material planning considerations taken into account in the
assessment of the application, having due regard to Annex A. 
 National Planning Policy Framework 3 (NPF3) (June 2014) 
 National Planning Policy Framework 4 (NPF4) (November 2021)
 Scottish Planning Policy (SPP) (June 2014)
 Argyll & Bute Landscape Wind Energy Capacity Study (2017)
 Climate Change (Emissions Reduction Targets) (Scotland) Act 2019
 The Future of Energy in Scotland: Scottish Energy Strategy, Scottish Government
(December 2017)
 Onshore wind policy statement, Scottish Government (January 2017)
 Historic Environment Policy for Scotland (HEPS) (April 2019)
 The Scottish Government’s Policy on ‘Control of Woodland Removal’ (Forestry
Commission Scotland 2009) 
 SNH Review 78 – Landscape Assessment of Argyll and the Firth of Clyde (1996)
 SNH Siting and Designing Wind Farms in the Landscape Guidance, (August 2017)
 Argyll & Bute Proposed Local Development Plan 2 November 2019
 Guidance for Landscape and Visual Impact Assessment, 3rd Edition, Landscape
Institute and Institute of Environmental Management & Assessment, (2013);
 Onshore Wind Turbines: Planning Advice, Scottish Government (May 2014). 
 Planning Advice Note 1/2011: ‘Planning and Noise’
 Scottish Government Good Practice Principles for Shared Ownership and
Community Benefit of Onshore Renewable Energy Developments; 
 Views of statutory and other consultees;
 Planning history of the site
 Legitimate public concern or support expressed on relevant planning matters 
 Argyll & Bute proposed Local Development Plan 2 (November 2019) – The
unchallenged policies and proposals within pLDP2 may be afforded significant
material weighting in the determination of planning applications at this time as the
settled and unopposed view of the Council. Elements of the pLDP2 which have
been identified as being subject to unresolved objections still require to be subject
of Examination by a Scottish Government appointed Reporter and cannot be

Page 12

afforded significant material weighting at this time. The provisions of pLDP2 that
may be afforded significant weighting in the determination of this application are
listed below: 
 Policy 14 – Bad Neighbour Development
 Policy 19 – Schedule Monuments
 Policy 35 – Design of New and Existing, Public Roads and Private Access
Regimes
 Policy 36 – New Private Accesses
 Policy 37 – Development Utilising an Existing Private Access or Existing Private
Road
 Policy 38 – Construction Standards for Public Roads
 Policy 39 – Construction Standards for Private Access
 Policy 40 – Vehicle Parking Provision
 Policy 43 – Safeguarding of Aerodromes
 Policy 58 – Private Water Supplies and Water Conservation
 Policy 63 – Waste Related Development and Waste Management
 Policy 76 – Development Impact on Local Nature Conservation Sites (LNCS)
___________________________________________________________________ 
(G) Does the Council have an interest in the site: No 
(H) Is the proposal consistent with the Local Development Plan: No
___________________________________________________________________ 
Author of Report:   Arlene Knox   Date:  13th September 2022 
Reviewing Officer:   Sandra Davies  Date:  13th September 2022 
Fergus Murray 
Head of Development and Economic Growth

Page 13

RECOMMENDED REASONS FOR OBJECTION TO: 22/00385/S36 
1.  Landscape & Visual Impact (including cumulative) 
Argyll & Bute Council will assess development proposals with the aim of protecting conserving
and where possible enhancing the built, human and natural environment.  A development
proposal will not be supported when it does not protect, conserve or where possible enhance
the established character and local distinctiveness of the landscape in terms of its location,
scale, form and design.  Argyll & Bute Council will resist renewable energy developments
where these are not consistent with the principles of sustainable development and it has not
been adequately demonstrated that there would be no unacceptable significant adverse
landscape and visual impacts, whether individual or cumulative. 
The proposed development site lies within the Knapdale Upland Forest Moor Mosaic
Landscape Character Type (LCT) which covers much of the Knapdale area between West
Loch Tarbert and the southern edge of the Knapdale National Scenic Area. This landscape
has a simpler landform in the south-west but is complex and craggy in the north-east. The
operational Allt Dearg and Srondoire wind farms occupy a prominent location in the LCT. The
consented Airigh wind farm, while comprising larger turbines, is associated with the more
subdued terrain occurring in the south-west of this LCT. 
This proposal, which comprises very large turbines of up to 200m, would be sited in a basin
which reduces its prominence and intrusion seen from Loch Fyne and from the settled eastern
coastal fringes of this loch. The containment provided by landform is diminished in views from
the south around West Loch Tarbert however where turbines would be visible in closer
proximity and where their scale would be more appreciated due to greater visual exposure
and because they would be seen in close conjunction with the smaller scale settled loch
fringes. 
Visibility from the northern shores of West Loch Tarbert will be minimal and while this proposal
would be visible from parts of Gigha, the Ardpatrick Point area and from the west Kintyre coast,
it would not have a significant effect due to the greater distances involved and also because
of the presence of the consented Airigh wind farm which is more prominent in some of these
views. The greatest degree of visibility (and intrusion) would occur from the waters of West
Loch Tarbert, from its south-eastern coastal fringes and from parts of the northern Kintyre
uplands. 
Significant adverse effects would occur on the following landscape/seascape character areas: 
 The Knapdale Upland Forest Moor Mosaic LCT extending approximately 2km from the
proposed wind farm site 
 The Rocky Mosaic LCT where it covers the south-eastern shores of West Loch Tarbert 
 The West Loch Tarbert Local Coastal Character Area. 
The significant adverse visual effects associated with the proposal would principally affect
views in the West Loch Tarbert area as follows: 
 The A83 where it is aligned on the south-eastern coastal fringe of West Loch Tarbert. This
road is an important tourist route forming part of National Cycle Network 78 and the Kintyre
66. 
 The Kennacraig to Islay ferry route within inner West Loch Tarbert 
 Footpaths in the Dun Skeig area and from a section of the Kintyre Way.

Page 14

In the above views, this proposal would be seen simultaneously or sequentially with the
operational Freasdail and consented Airigh wind farms. 
This proposal would be one of the first wind farm proposal to introduce lighting to the dark
skies of Kintyre. While the intensity of lights will reduce when seen from lower elevation coastal
fringes, it is considered that they would still be clearly visible from these more settled and
frequented areas and that they may extend the duration of significant adverse effects on views
from the West Loch Tarbert area. The potential cumulative effects of visible aviation lighting
on character and views are a concern given the number of recent applications for turbines
>150m in Argyll & Bute requiring such lighting although it should be noted that the recent
Earraghail wind farm application is committed to the adoption of an Aircraft Detection Lighting
Strategy (ADLS) which would substantially reduce the duration of night-time lighting. 
Cumulative landscape and visual effects with the application-stage Sheirdrim wind farm are a
key concern. If the Sheirdrim proposal is consented on appeal it is considered that the addition
of the Rowan proposal would result in a major adverse combined cumulative effect on the
West Loch Tarbert area significantly affecting its character and views from the A83, settlement,
footpaths and the Islay ferry. 
It is therefore concluded that this proposal is unacceptable in landscape and visual grounds
principally because of its prominent location in relation to West Loch Tarbert and its sensitive
coastal fringes, including impacts on views from key transport routes which are important for
visitors. 
Having due regard to the above it is concluded that the proposal will have significant
adverse landscape and visual impacts (including cumulative) and is therefore
inconsistent with the provisions of: SG LDP ENV 14 –Landscape; SG 2 Renewable
Energy; LDP STRAT 1 – Sustainable Development; LDP DM1 – Development within the
Development Management Zone; LDP 3 – Supporting the Protection, Conservation and
Enhancement of our Environment; Policy LDP 6 – Supporting the Sustainable Growth
of Renewables; LDP 9 – Development Setting, Layout and Design;  of the Argyll & Bute
Local Development Plan; SPP (2014); the Onshore wind policy statement, (2017); and
guidance contained in the Argyll & Bute Landscape Wind Energy Capacity Study 2017. 
2. Aviation 
Argyll & Bute Council will assess development proposals with the aim of preventing
unnecessary dangers aircraft.  Policy requires that development is refused where it would
constrain the present and future operations of existing airports and airfields. 
National Air Traffic Services Safeguarding (NATS) have advised that an unacceptable
technical impact is anticipated and they object.  Glasgow Prestwick Airport advise that the
development raises aviation safety concerns which have an operational impact on the airport
as an air navigation services provider.  Until all technical and operational aviation safety
matters are addressed to the satisfaction of Glasgow Prestwick Airport, and a mitigation
agreement is put in place for the life of the wind farm, the airport also objects to the proposal. 
Local Development Plan Policy is clear that developments that have an adverse impact on the
Safeguarding of Airports should be refused.   
Having due regard to the above it is concluded that due to the fact that National Air
Traffic Services Safeguarding (NATS) and Glasgow Prestwick Airport have advised the
Energy Consents Unit that they object to the proposal, it will have an adverse impact
on aviation and is therefore inconsistent with the provisions of SG 2 Renewable Energy,
Policy LDP 6 – Supporting the Sustainable Growth of Renewables and SG LDP TRAN 7

Page 15

–Safeguarding of Airports of the Argyll & Bute Local Development Plan, SPP (2014) and
the Onshore Wind Policy Statement in this respect. 
Argyll & Bute Council therefore object to the proposal due to the adverse impact it
would have on Aviation.  The Energy Consents Unit should please note that in the event
that National Air Traffic Services (NATS) and Glasgow Prestwick Airport withdraw their
objections, then Argyll & Bute Council would no longer object on these grounds. 
Should these objections not be removed and the proposal progresses to an Inquiry,
Argyll & Bute Council would defer to National Air Traffic Services and Glasgow
Prestwick Airport as the Technical Experts on this matter.

Page 16

APPENDIX A – PLANNING LAND USE AND POLICY ASSESSMENT 
A. THE SECTION 36 CONSENTING REGIME 
In Scotland, any application to construct or operate an onshore power generating station, in
this case, a renewable energy development with an installed capacity of over 50 megawatts
(MW) requires the consent of Scottish Ministers under Section 36 of the Electricity Act 1989.
Any ministerial authorisation given would include a ‘deemed planning permission’ and in these
circumstances there is then no requirement for a planning application to be made to the
Council as Planning Authority. The Council’s role in this process is one of a consultee along
with various other consultation bodies. 
It is open to the Council to either support or object to the proposal, and to recommend
conditions it would wish to see imposed in the event that authorisation is given by the Scottish
Government. In the event of an objection being raised by the Council, the Scottish Ministers
are obliged to convene a Public Local Inquiry (PLI) if they are minded to approve the proposal.
They can also choose to hold a PLI in other circumstances at their own discretion. Such an
Inquiry would be conducted by a Reporter(s) appointed by the Directorate for Planning and
Environmental Appeals. In the event that consent is given, either where there has been no
objection from the Council, or where objections have been overruled following PLI, the Council
as Planning Authority would become responsible for the agreement of matters pursuant to
conditions, and for the ongoing monitoring and enforcement of such conditions. 
This report reviews the policy considerations which are applicable to this proposal and the
planning merits of the development, the views of bodies consulted by the Scottish Government
along with other consultations undertaken by the Council, and 3rd party opinion expressed to
the Scottish Government following publicity of the application by them. It recommends views
to be conveyed to the Scottish Government on behalf of the Council before a final decision is
taken on the matter.  The conclusion of this report is to recommend that the Council raise an
Objection to this Section 36 consultation on Landscape & Visual Grounds for the reasons
detailed in this report. 
B. SETTLEMENT STRATEGY 
Policy LDP 6 of the Adopted Local Development Plan sets out the Council’s Policy for
renewable energy developments, in accordance with SPP 2014.  In addition, there is also the
Supplementary Planning Guidance (SPG).  SPG 2 contains a Spatial Framework which has
been prepared in accordance with SPP 2014.   
In terms of the Local Development Plan Settlement Strategy, the main wind farm site area is
located within a primarily a combination of: Countryside Zone and Very Sensitive Area; with
some small areas adjacent to the B8024 located within Rural Opportunity Area all subject to
the provisions of LDP policy LDP DM 1.  In principle, policy LDP DM 1 supports renewable
energy and ancillary developments in these areas, providing they are consistent with all other
Local Development Plan Policies.  In this case, it has not been demonstrated that the scale
and location of the proposal, will integrate sympathetically without giving rise to adverse
consequences in terms of: landscape & visual impact (including cumulative).  For the reasons
detailed below in this report, it is considered that this proposal does not satisfy Development
Plan Policy and associated guidance in respect of renewable energy development. 
Having due regard to the above it is considered that due to adverse Landscape & Visual
Impact (including cumulative) the proposal is contrary to the provisions of LDP DM1 –
Development within the Development Management Zones; SPP (2014); and National
Planning Framework 3.

Page 17

C. SUPPORTING THE SUSTAINABLE GROWTH OF RENEWABLES 
Argyll & Bute Council is keen to ensure that Argyll & Bute continues to make a positive
contribution to meeting the Scottish Government’s targets for renewable energy generation. 
These targets are important given the compelling need to reduce our carbon footprint and
reduce our reliance on fossil fuels,  reinforced by the  Climate Change (Emissions Reduction
Targets) (Scotland) Act 2019. The Council will support renewable energy developments where
these are consistent with the principles of sustainable development and it can be adequately
demonstrated that there would be no unacceptable significant adverse effects.   
D. LOCATION, NATURE AND DESIGN OF PROPOSED DEVELOPMENT 
The Site - is located approximately 4.5km to the north west of Tarbert. Tarbert lies
approximately 1.2km east of the site boundary and 4.5km south-east from the nearest
proposed turbine. The site is situated within a combination of existing commercial plantation
forestry and open moorland. The forested part of the site predominately hosts dense sitka
spruce, mixed broadleaves along watercourses and other mixed conifers, whilst the open
moorland to the west of the site comprises interspersed pockets of peaty soils and shallow
peat habitat rising up to several modest rocky summits.  Loch Chaorainn is situated outside of
the site boundary at its northern edge and is a reservoir source for Tarbert’s drinking water. It
links to Abhainn na Cuile which runs generally north to south through the site, eventually
meeting West Loch Tarbert approximately 900m south of the site boundary. Part of Abhainn
na Cuile is excluded from the site boundary owing to an existing run of river hydro power
scheme. Loch Chaorainn Beag is situated to the south-west of the site. 
The site is located approximately 600m north-west of the A83, and site access is proposed to
be taken from the corner of the B8024. The A83 is the main arterial route that serves the
Kintyre Peninsula and links Campbeltown to the western shore of Loch Lomond where it joins
the A82 south to Glasgow and north to Inverness. There are several ferry services which
operate close to Tarbert. The Tarbert to Portavadie ferry is a small vehicle and passenger
ferry which operates approximately hourly on a ‘turn up and go’ basis and links Kintyre to the
Cowal peninsula. Approximately 7.2km south of the nearest turbine (T13), ferries operate two
or three times daily from Kennacraig to both Port Askaig and Port Ellen in the north and south
of Islay. Further south, Gigha is serviced multiple times per day by ferry from Tayinloan.   
Loch Fyne is situated approximately 4.2km to the east of the nearest turbine (T4), whilst West
Loch Tarbert is situated approximately 2.8km south of its nearest turbine (T13). Both Lochs
have part of their shorelines designated as Areas of Panoramic Quality (APQs). Loch Fyne
and to a lesser degree West Loch Tarbert are used by recreational water users, in particular
those pleasure craft using Portavadie Hotel, Marina and Spa across Loch Fyne at
approximately 10.5km to the nearest turbine (T4). South Knapdale adjoins the Kintyre
Peninsula close to the site. The B8024 serves as the main route to small settlements on the
south Knapdale coast including Torinturk, Dunmore, Kilberry, Cretshengan and Ormsary.
Kilberry, on the western coast of South Knapdale, is approximately 12km west of the nearest
turbine (T11) whilst Torinturk on the southern coast is approximately 5km south of T12. 
Proposal – The proposed development would be time-limited to 35 years from the first date of
commercial operation. The construction phase would last approximately eighteen months and
decommissioning would last approximately six months. Deemed planning permission is
sought to permit a period of five years between the date of the Decision Notice and expiry of
consent (should works not be commenced) rather than the usual three years. This is to
accommodate any potential grid delays.  The proposal would consist of the following principal
components: 13 wind turbines up to 200m to blade tip (some with aviation lighting); associated

Page 18

turbine compound areas including foundations and hardstanding areas for erecting cranes at
each turbine location; on-site tracks connecting each turbine; a new graded access junction
with the B8024; new pedestrian, cyclist and recreational use of the wind farms tracks following
commissioning of the wind farm, and associated facilities including 10-vehicle informal car
park, interpretive boards, benches and bins; 10 new watercourse crossings; on-site 132kv
substation to provide ‘tee-in’ to the Inveraray to Crossaig overhead line; underground cables
linking the turbines to the substation, typically along internal tracks; an Energy Storage
Compound to store batteries to a 5MW capacity which would be within the construction
compound footprint; up to 2 borrow pits for the extraction of stone on-site (indicated on EIA
Figure 3.1) (the Council would normally expect these to be the subject of separate mineral
consent applications);; a temporary construction compound including provision for onsite
concrete batching; Forestry felling and restocking as proposed within EIA Report Chapter 14:
Forestry; Habitat Management provisions as proposed within Technical Appendix 8.5 within
Volume 3 of the EIA Report. 
Turbines would be of tubular steel construction, finished in a typical off-white matt colour and
comprise three blades. The final turbine choice would be made post-consent during the
procurement phase, but for the purposes of the EIA Report, a representative candidate turbine
of 200m tip, 155m rotor diameter and 122.5m hub height is used. In order to carry the power
generated to the local electricity network, each turbine would require a transformer to step up
to a high voltage. Transformers will be internal to the turbine. 
Infrastructure 
Water and Foul Drainage – Scottish Water has advised the ECU that they have no objection;
however, they advise that this does not confirm that the proposal can be serviced. 
Drinking Water Protected Areas – Scottish Water has advised the ECU that a review of their
records indicates that the proposed activity falls within a drinking water catchment where a
Scottish Water abstraction is located. Scottish Water abstractions are designated as Drinking
Water Protected Areas (DWPA) under Article 7 of the Water Framework Directive. Loch
Chaorainn supplies Tarbert Argyll Water Treatment Works (WTW) and it is essential that water
quality and water quantity in the area are protected. It is a relatively small catchment therefore
there may be less opportunity for dilution and a potential higher risk of activities affecting water
quality. Travel times of any pollution event will be short and water quality protection measures
must be implemented and Scottish Water must be made aware of what these measures will
be and when work will commence on site. There are at least 3 turbines that are close to the
source, it would be useful to have the turbine numbers and eastings and northings of each of
them so that Scottish Water can plot them on their mapping system and confirm which turbines
are the highest risk to water quality. Scottish Water has provided advice/list of precautions to
the ECU to pass on to the Applicant in this regard. 
Infrastructure within the boundary – Scottish Water has advised the ECU that a review of their
records indicates that there are Scottish Water assets in the area.  There are water mains and
other possible infrastructure and pipework where the activity is taking place and also in close
proximity to some of the turbines. This should be confirmed however through obtaining plans
from Scottish Waters Asset Plan Providers. All Scottish Water assets potentially affected by
the activity should be identified, with particular consideration being given to access roads and
pipe crossings. All of Scottish Water’s processes, standards and policies in relation to dealing
with asset conflicts must be complied with. Works should not take place on site without prior
written acceptance by Scottish Water. 
Surface Water - Scottish Water has advised the ECU that for reasons of sustainability and to
protect their customers from potential future sewer flooding, they will not accept any surface
water connections into their combined sewer system.

Page 19

Grid Network - The grid connection does not form part of the section 36 consent application. 
Final details of the grid connection would be subject to a separate design and consent process
at a later date. 
Figure 3.2: Typical Turbine Elevations shows a hub height of 200m and a rotor diameter of
155m, this would give an overall height of 277.5m.   
E. SPATIAL FRAMEWORK FOR WIND FARMS 
SPP requires that planning authorities set out in the development plan a spatial framework
identifying those areas that are likely to be most appropriate for onshore wind farms. In terms
of the Council’s Spatial Framework for wind farms (Supplementary Guidance 2: Wind Farm
Map 1 - Figure 1 Spatial Framework for wind turbines over 50 metres to blade tip), the proposal
lies predominately within a Group 3 area (area with potential for wind farm development
subject to other policy consideration), with its western edge being in a Group 2 area (Area of
significant protection) owing to its classification as an area of Class 2 Carbon Rich Soil and
Peat. In Group 2: Areas of significant protection – wind farms may be appropriate in some
circumstances.  Further consideration will be required to demonstrate that any significant
effects on the qualities of these areas can be substantially overcome by siting, design or other
mitigation.  Group 3: Areas are likely to be acceptable, subject to detailed consideration
against identified policy criteria. 
F. NET ECONOMIC IMPACT, INCLUDING LOCAL AND COMMUNITY SOCIO-ECONOMIC
BENEFITS SUCH AS EMPLOYMENT, ASSOCIATED BUSINESS AND SUPPLY CHAIN
OPPORTUNITIES 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewables and
SPP require applications for renewable energy developments to be assessed against net
economic impact, including local and community socio-economic benefits such as
employment, associated business and supply chain opportunities. 
Large scale infrastructure projects, such as wind farms have the potential to impact upon local
and national economies. The EIA has considered the likely effects of the proposal on the
economies of Argyll & Bute and Scotland including specific consideration of the effects on
employment and population. It has also considered the effects on tourism and recreation
activities which are a key part of the Argyll & Bute economy (covered under the tourism
heading of this report). In addition, the effects of the proposal on energy security and fuel
poverty have been assessed. 
The assessment has found that, for Argyll & Bute, the proposal would lead to beneficial effects
on the wider economy and specifically through job creation during the construction process,
and predicts that construction of the proposal would result in effects on both job creation and
the economy in Argyll & Bute that are of a moderate level and would not be significant. Some
significant effects are predicted on tourism and recreation activities during the construction
process. These would be limited to one accommodation (Lochhead Cottage) and localised
areas where impacts would be experienced by walkers and equestrians on the B8024 and
cyclists on Sustrans Route 78. All relate to the construction of the site entrance and access.
Effects on all other tourist and recreation receptors during construction would not be
significant. There would be no effects on either the energy security of the local or wider
communities or on levels of fuel poverty during the construction phase. There would be no
significant effects on population as a result of the construction of the proposed wind farm. 
During operation there would be low levels of employment relating to operation and
maintenance of the wind farm. As a result, effects on job creation and the wider economy

Page 20

would be of a low level and would not be significant. There would be no effects on energy
security and fuel poverty during the operation and there would be negligible effects on
population. 
The EIAR advises that Community Benefit Funds would be made available for the local
community. Community Benefit is not however, considered to be a ‘material planning
consideration’ in the determination of planning applications.  In the event that permission were
to be granted, the negotiation of any community benefit, either directly with the local
community or under the auspices of the Council, would take place outside the application
process. 
Representations have been received by the ECU in support of the proposal in this regard as
an opportunity for local contractors – the opportunity to tender for work in construction which
supports local economies. 
Having due regard to the above the proposals net economic impact, including local and
community socio-economic benefits such as employment, associated business and
supply chain opportunities has been assessed and it is concluded that the proposal is
consistent with the provisions of Supplementary Guidance 2 (December 2016); LDP
DM1 – Development within the Development Management Zones; LDP 3 – Supporting
the Protection, Conservation and Enhancement of our Environment; LDP 6 - Supporting
the Sustainable Growth of Renewables; SPP (June 2014) and the Onshore wind Policy
Statement (January 2017) in this regard. 
G. THE SCALE OF CONTRIBUTION TO RENEWABLE ENERGY GENERATION TARGETS 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against the
scale of contribution to renewable energy generation targets.   
The Scottish Government is committed to increasing the supply of renewable energy within
Scotland.  The Climate Change (Emissions Reduction Targets) (Scotland) Act 2019 sets
stringent targets for Scotland. The Act sets a legally-binding “net-zero” target of all greenhouse
gases by 2045. The “net-zero” target for Scotland is five years ahead of the date set for the
whole of the UK.  The proposal would provide approximately 85.8 MW of installed capacity in
addition to 5MW of battery storage capacity, depending on the turbine model chosen. It is
estimated by the Applicant that this installed capacity could generate approximately
300,502MWh of renewable electricity each year which would be expected to power the
equivalent of approximately 80,500 homes on average each year1, or provide 1.6 million full
battery charges for electric vehicles per year. 
Representations have been received by the ECU in support of the proposal in this regard
including: Climate Emergency & Climate Change benefits (including need for renewable
energy); expansion of Renewable Energy required to meet Net Zero targets; The Government
have publicised a substantial further need for new wind farms in the right places by 2030; and
it does not detract from the wider scenic nature of the area; it is a key part of our future that
brings benefits to the immediate community as well as 85MW of clean energy to be used
across Scotland. 
Having due regard to the above the proposals scale of contribution to renewable energy
generation targets has been assessed and it is concluded that the proposal is
consistent with the provisions of SG 2; Supplementary LDP STRAT 1 – Sustainable
Development; LDP DM1 – Development within the Development Management Zone;
LDP 3 – Supporting the Protection, Conservation and Enhancement of our

Page 21

Environment; LDP 6 - Supporting the Sustainable Growth of Renewables; SPP (2014);
and the Onshore wind Policy Statement (2017) in this regard. 
H. EFFECT ON GREENHOUSE GAS EMISSIONS 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against their
effect on greenhouse gas emissions.  In respect of SG policy, the Climate Change (Emissions
Reduction Targets) (Scotland) Act 2019 raises the ambition of the greenhouse gas emissions
reduction targets set out in the Climate Change (Scotland) Act 2009. The Act sets a legally-
binding “net-zero” target of all greenhouse gases by 2045.   
The proposal would generate renewable electricity and would therefore displace carbon
dioxide (CO2) emissions associated with electricity generation, which would otherwise be
supplied via other forms of power generation requiring the combustion of fossil fuels. The
Scottish Government Carbon Calculator for Wind Farm on Peatlands has been used to
calculate a payback period for the proposal based on the full development lifecycle.  A carbon
assessment was included in the EIAR to estimate the potential savings in carbon dioxide
(CO2) emissions by the proposal replacing other electricity sources. This would be a large
contribution to renewable energy generation targets. The carbon calculator is reported upon
within Chapter 15 of the EIAR. It concludes that the carbon payback time is 3.4 years for the
scheme, and 50,698 tonnes of carbon would be saved. 
Having due regard to the above the proposals effect on greenhouse gas emissions has
been assessed and it is concluded that the proposal is consistent with the provisions
of SG 2 Renewable Energy; LDP STRAT 1 – Sustainable Development; LDP DM1 –
Development within the Development Management Zone; LDP 3 – Supporting the
Protection, Conservation and Enhancement of our Environment; LDP 6 - Supporting
the Sustainable Growth of Renewables; SPP (2014); and the Onshore wind Policy
Statement (January 2017) in this regard. 
I. IMPACTS ON COMMUNITIES AND INDIVIDUAL DWELLINGS, INCLUDING RESIDENTIAL
AMENITY, NOISE AND SHADOW FLICKER (INCLUDING CUMULATIVE IMPACTS). 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against
impacts on communities and individual dwellings, including visual impact, residential amenity,
noise and shadow flicker.   
The Council’s Environmental Health Officer (EHO) has noted the following from the “Rowan
Wind Farm, Environmental Impact Assessment Report, Volume 1, Chapter 16: Schedule of
Mitigation, December 22, page 7”: Construction times - Construction activities will be
scheduled, unless otherwise agreed, from Monday to Friday 07:00 to 19:00 and Saturday
07:00 to 13:00. Unattended plant equipment should be kept to a minimum. Construction
activities outside of these times, short term high transient noise events, or activities relatively
close to noise sensitive receptors (NSRs) should be scheduled in consultation with the
residents to minimise their inconvenience. As part of a Construction Environmental
Management Plan (CEMP) a Construction Noise Management Plan (CEMP) would be
produced. The plan would be taken forward for all Construction works and any post-
construction works of a similar nature that are associated with the proposal (e.g.
maintenance). The plan would include a clear construction schedule detailing the equipment
to be used and the following information: Detailed plan showing how permitted working hours
will be adhered to; Selection of quiet equipment and possibly acoustic barriers near noisy
sources to ensure construction noise limits are met; and A detailed plan on community

Page 22

relations including a Stakeholder Engagement Plan (SEP) including the setting up of a
complaint phone line, a procedure to notify residents and the EHO of any necessary work
outside of the permitted working hours and an approach to the investigation of complaints. 
Conditions are recommended by the EHO in respect to noise and private water supplies. 
Noise Assessment – the EHO notes that final turbine selection would be made following the
grant of any planning consent, following a tendering and procurement exercise. It is has been
assumed that turbines would generate power for all wind speeds between 4m/s and 25m/s;
and that at wind speeds greater than 25m/s (gale force) the turbines would shut down for self-
protection. Operational Noise effects have been assessed using the methodology described
in ETSU-R-97 and the proposal in isolation would comply with the simplified criterion of 35 dB,
LA90, 10min described in ETSU-R-97 and cumulative effects would not significantly exceed
full ETSU limits based on background noise. In both scenarios, the proposal will comply with
the required noise limits at all receptor locations. 
Noise - The EHO has no objection to the proposal, subject to noise conditions being attached
to any consent the ECU is minded to give.  These conditions relate to: noise during proposed
works; site noise plans (Construction Noise Management Plan); noise immissions; noise
immissions; report demonstrating compliance with noise limits; complaints & independent
noise monitoring; provision of independent consultants assessment; logging of wind speed,
wind direction and power generation data; and a nominated representative/point of contact for
local residents for noise complaints. Note: there are two typos in the EHO response: reference
is made to a blade tip height of 230m this should be 200m and condition 2 of the recommended
conditions begins “Prior to the installation of any turbines” this should read “Subject to the wind
farm being commissioned”.
Air Quality – the EHO has not made any comment in respect to air quality
Lighting – the EHO has not made any comment in respect to lighting. 
Shadow Flicker – Scottish Government guidance states that shadow flicker is only a concern
for residential properties that are 10 rotor diameters from a turbine or less. Furthermore, due
to the angle of the sun in this part of the world, only properties lying 135 degrees either side
of geographic north are affected. Since the rotor diameter of the turbines studied in the EIA
Report is 155m, properties within 1.55km of a turbine could experience effects from shadow
flicker. A study of the area surrounding the proposed development has shown that there are
no properties in any direction within 1.55km of a turbine. Shadow flicker is therefore not a
concern. The EHO has not made any comment in respect to Shadow Flicker.
Private Water Supplies – The EHO has advised that a condition should be attached in the
event that consent is granted to secure the submission of a Private Water Supply Action Plan
prior to the commencement of development.  This plan should detail all mitigation measures
to be delivered to secure the quality, quantity and continuity of water supplies to properties
which are served by private water supplies which may be affected by the development.
The Scottish Environmental Protection Agency (SEPA) initially advised the ECU that they
objected to the proposal on the grounds of insufficient information in regard to private water
supplies. In response the Applicant provided “the Rowan Wind Farm - Review of Private Water
Supplies (dated 15 April 2022) prepared by Ramand Environmental.  SEPA considered this,
and have since informed the ECU that their objection in respect to private water supplies is
withdrawn.  SEPA further advise that should the ECU be minded to grant consent that
conditions are attached relating to: micrositing; an updated Peat Management Plan; and water
crossings.

Page 23

Residential amenity – as detailed in summary of representations earlier in this report, concerns
have been raised by the owner of Mullach Ghlas in respect to the impact of this proposal on
their residential amenity.  These concerns relate to: length of construction; construction and
operational noise; visual amenity; and private water supplies.  It is understood that the
Applicant has been in discussion with the owner of this property, in respect to these matters.
The construction period is estimated to be 18 months.  In terms of construction noise the
Applicant has estimated that the owner would likely receive 41.9dB at their property during the
noisiest and closest element of construction work which would involve breaking rock at the
eastern borrow pit approx 800m away.  This is within a limit of 65dB.  Track will require
upgrading/widening in places – the closest part of track to the closest part of Mullach Ghlas is
approximately 172m and approximately 155m from the edge of the garden.  Given the borrow
pit is predicted to be the noisiest activity, it is assumed that works to the track would be below
the 41.9dB referred to above. The Applicant understands that works under this limit may still
cause issues to the owner of Mullach Ghlas and have advised that they would be happy to
commit to construction noise monitoring at Mullach Ghlas (and other nearby) properties from
an independent 3rd party.  It is understood that the Applicant may also be in discussion with
their noise consultants and other potential noise attenuation measures.
In terms of operational noise the nearest turbine is T4, which is approximately 2.6km from
Mullach Ghlas.  The Applicant has calculated that this would be 25.9dB against a limit of 35dB
and therefore there would be no significant effect.
In terms of visual amenity the Applicant has advised that the owner of Mullach Ghlas won’t
see the turbines because of topography.  Furthermore, that there should be an element of
forestry retention that will screen Mullach Ghlas from most of the construction work (i.e.
substation (approximately 800m away), borrow pit (approx 1.5km away, turbines).  The owner
may see some of the track upgrade at the closest point to Mullach Ghlas, and the grading of
the initial slope and entrance from the road/golf club.  During operation, the Applicant has
advised that they do not foresee the privacy of Mullach Ghlas being an issues from drastically
increase use of the paths, but they would be open to further discussion with the owner on this
once they are at the detailed design stage (should they get consent).
In terms of private water – it is understood that discussions are ongoing between the Applicant
and the owner of Mullach Ghlas.
Having due regard to the above subject to the recommended conditions being applied
in the event that consent is granted by the ECU it is concluded that the proposal will
not have any adverse impacts on communities and individual dwellings, including,
residential amenity, noise and shadow flicker and subject to the recommended
conditions is consistent with the provisions of SG 2 Renewable Energy; LDP STRAT 1
– Sustainable Development; LDP DM1 – Development within the Development
Management Zone; LDP 3 – Supporting the Protection, Conservation and Enhancement
of our Environment; LDP 6 - Supporting the Sustainable Growth of Renewables; LDP 9
– Development Setting, Layout and Design; SPP (2014); and the Onshore Wind Policy
Statement (2017) in this regard. 
J. LANDSCAPE AND VISUAL IMPACTS, INCLUDING EFFECTS ON WILD LAND
(INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for wind turbine developments to be assessed against any
landscape and visual impacts including wild land.

Page 24

Argyll & Bute Council’s landscape consultant provides the following advice: 
Introduction – A review of the landscape and visual effects of the proposal has been
undertaken by Argyll & Bute Council’s landscape consultant and is based on examination of
the Environmental Impact Assessment Report (EIA-R) dated December 2021 and a field visit
undertaken in March 2022. This review was originally issued in April 2022 but revised in June
2022 to take account of changes made by the applicant to the visibility aviation lighting
strategy. 
The Proposal - The Rowan Wind Farm proposal comprises 13 turbines, 200m to blade tip and
ancillary infrastructure including an energy storage compound. Access to the development
would be from the B8024 and 11.88km of new track would be constructed. The description of
the proposed development set out in Chapter 3 of the EIA-R dated December 2021 does not
address the requirements for visible aviation lighting with the specification for this contained
in the LVIA. The applicant issued a revised aviation lighting strategy and assessment in June
2022. 
Information provided in Landscape and Visual Impact Assessment (LVIA) - The LVIA has been
undertaken in accordance with the Guidelines for Landscape and Visual Impact Assessment,
Third Edition. The level of detail provided is appropriate and the Council’s landscape
consultant agrees with the majority of the judgements made with regard to significant
landscape and visual effects. The figures provided to support the LVIA are clear and
informative with representative viewpoint location maps, the detailed 10km Zone of
Theoretical Visibility (ZTV) map and figures illustrating sequential effects from ferry routes
especially useful. 
2017 Argyll & Bute Landscape Wind Energy Capacity Study - The proposed wind farm lies
within the Knapdale Upland Forest Moor Mosiac Landscape Character Type (LCT) 6b
identified in the Argyll & Bute Landscape Wind Capacity Study (ABLWCS). This LCT covers
the Knapdale peninsula between West Loch Tarbert and the southern boundary of the
Knapdale National Scenic Area. 
The Knapdale Upland Forest-Moor Mosaic LCT has an irregular and often complex craggy
landform with pronounced ridges and occasional high, more defined summits, although some
limited areas of slightly smoother and gentler hill slopes also occur, mainly in the south-west.
This LCT has a simple land cover of extensive coniferous forestry and moorland; it is also
sparsely populated and already accommodates wind farm development. While the scale and
sparsely settled nature of this landscape presents potential opportunities to accommodate
large scale wind farm development, areas of more complex smaller scale hills fringing the
outer edge of this upland area and the more defined ridges and peaks within its core are
sensitive to such development. 
There is little settlement in this landscape and it is not notably popular for recreation. Visibility
of the interior of these uplands is fairly restricted from roads and settlement within adjacent
low-lying coastal areas although there are longer views from the nearby Knapdale NSA,
across Loch Fyne, West Loch Tarbet and from Arran and Gigha. 
The proposed turbines, which would be up to 200m high to blade tip, would fall within the ‘Very 
Large’ typology considered in the ABLWCS. The study concludes that the combined
landscape and visual sensitivity of the Knapdale Upland Forest Moor Mosaic LCT to this size
of turbine would be High. 
The ABLWCS sets out key constraints to development in this LCT. The Council’s landscape
consultant considers that this proposal would be contrary to some of these constraints in
respect of its effect on views across West Loch Tarbert from the A83 and cumulative effects

Page 25

with other wind farms, including the operational Freasdail wind farm (and the Airigh wind farm
which has been consented since the issue of the ABLWCS in 2017). While this proposal would
not be located on the highly sensitive ridge between Stob Odhar and Meall Reamhar which is
a scenic feature in views across West Loch Tarbert, it would detract from it in some views from
the south-east side of the loch. 
The proposed wind farm also lies close to the boundary of the Rocky Mosaic LCT. This LCT
covers much of the east and west coasts of Kintyre and extends around the shores of West
Loch Tarbert. Key constraints identified in the ABLWCS include the strong contrast which
occurs between these intricate settled sea and loch fringes with adjacent simple and more
expansive uplands, which makes an important contribution to the rich scenic composition
characteristic of Argyll. 
Landscape effects - The proposed development lies within the Kintyre Upland Forest Moor
Mosaic LCT and would have direct significant adverse effects on its character. The LVIA
concludes that these effects would occur within approximately 2km of the proposed wind farm
due to the extent of visibility of the proposal and the Council’s landscape consultant is in
agreement with this judgement. 
The Rocky Mosaic LCT comprises a narrow coastal strip on both the east and west coasts of 
Kintyre and around the shores of West Loch Tarbert. This is a small-scale, diverse and settled
landscape which is highly sensitive to large wind turbines. The proposal would not be located
in this LCT but would lie in relatively close proximity and be clearly seen from parts of this
LCT, principally affecting the south-eastern coastal fringes of West Loch Tarbert. The LVIA
concludes that effects (considered in a baseline which includes the operational Freasdail wind
farm) would be significant along the southern coast of West Loch Tarbert. The Council’s
landscape consultant agrees that the effects of this proposal would be significant and adverse
on the part of the Rocky Mosaic LCT lying on the south-eastern side of West Loch Tarbert. 
The LVIA additionally considers effects on the West Loch Tarbert Local Coastal Character
Area (LCCA), concluding that these would be significant. The Council’s landscape consultant
is in agreement with this judgement. 
Effects on valued landscapes - The proposed development site is not covered by any
landscape designations or other recognised landscape interests although a number of national
and local landscape designations lie within 20km of the proposal. 
There would be limited visibility of the proposal from the Knapdale National Scenic Area (NSA)
which lies to the north and from the Kyles of Bute NSA which lies to the west. 
There would also be limited visibility of the proposal from parts of the Area of Panoramic
Quality (APQ) covering south-west Knapdale. While a greater degree of theoretical visibility
would occur from the APQ covering the west coast of Kintyre in the Tayinloan area, this
proposal would be seen in the context of the closer consented Airigh wind farm and at
distances of >10km thus reducing impact. There would also be a greater degree of potential
visibility of the proposal from the APQ covering the east coast of Loch Fyne and the Ardlamont
peninsula area. However, screening of the site by landform reduces the visibility of the full
vertical extent of the turbines and this limits intrusion from more open coastal fringes and hills. 
In conclusion, the Council’s landscape consultant considers that the effects of this proposal
on designated landscapes lying within Argyll & Bute would not be significant. 
Visual effects - The proposal sits in a shallow basin and benefits from a degree of screening
by landform which particularly limits views of the vertical extent of turbines from the east across
Loch Fyne, its eastern shores and the Ardlamont peninsula. The screening effect of landform

Page 26

within the site is diminished however to the south-west and this proposal would be widely
visible across the West Loch Tarbert area and seen in relatively close proximity to key
receptors. LVIA Figure 6.4 is useful in showing the likely extent of visibility within 10km of the
proposed development site. 
The location of the proposal close to the transition with the more settled coastal fringes of
West Loch Tarbert and to key roads, increases the impacts of this proposal when compared
with other operational and consented wind farms located on the Kintyre peninsula. This
proposal would be particularly prominent in views from the north Kintyre uplands and from the
south-eastern shores of West Loch Tarbert. Significant adverse effects on views would occur
on the following receptors: 
 The A83 as it is aligned to the south of West Loch Tarbert. This is an important route
for tourists, forming part of Kintyre 66 and National Cycle Network Route 78 (Caledonia
Way). EIA-R Viewpoints 2, 10 and 19 demonstrate the significant adverse effects that will
occur on scenic views from this route. Similar views will be experienced from settlement
including from parts of Whitehouse and its surrounds as well as from dispersed residential
properties. 
 The Kennacraig to Islay ferry route – The ferry route assessment visualisations and
maps set out in the LVIA are informative and help confirm that significant adverse effects
would occur on views from approximately 2km of the route within West Loch Tarbert. This
proposal would be seen sequentially with the operational Freasdail wind farm in views from
the waters of West Loch Tarbert. 
 Footpaths in the local area, including those to Dun Skeig and from the northern section
of the Kintyre Way where significant cumulative effects with operational and consented
developments will also occur. EIA-R Viewpoints 6 and 11 illustrate these effects. 
Night-time lighting effects - Visible aviation lighting is proposed on the nacelles of 6 of the 13
turbines of the proposal. Reduced intensity lighting (where 2000 candela nacelle lighting would
reduce to 200 candela during periods of clear visibility) and directional lighting with a focussed
horizontal beam of light (limiting lighting intensity seen from lower-lying views) are both
embedded features of the lighting scheme. 
Night-time visualisations have been produced from 4 representative viewpoints and a lighting
assessment is set out in the updated Technical Appendix 6.3. All 4 of these viewpoints are
located at low elevations and between 3.7km to 13.6km from the proposal. Table 6.3.4
summarises the number of illuminated turbines that will be seen from each of the 21
representative viewpoints considered in the LVIA. The LVIA lighting assessment concludes
that no significant effects would be associated with visible aviation lighting. 
Roads and settlement are principally located on lower-lying coastal fringes where the intensity
of light would be reduced to between 200-175cd or 20-18cd in clearer conditions which are
estimated in the EIA-R to occur for 98% of the time (Figure 6.3.Cb). There are few elevated
locations where the lights would be seen at greatest intensity with the Kintyre Way one of the
few higher-level viewpoints in this part of Argyll & Bute. The reduced and directional intensity
lighting committed to by the applicant would reduce night-time effects although in the absence
of comparable visible aviation lighting on operational turbines to visit in the field it is difficult to
gauge the accuracy of night-time visualisations and the LVIA lighting assessment (it is the
understood that there are currently no operational wind turbines which feature reduced and
directional intensity of lighting mitigation.  Review of the visible aviation lighting assessments
undertaken for a range of recent wind farm proposals reveals a divergence in lighting
specification, night time visualisations and judgements made on the likely significance of
effects).
The Council’s landscape consultant considers that the lighting assessment may have under-

Page 27

estimated the effects of visible aviation lighting for Viewpoints N2 and N10. The Council’s
landscape consultant also believes that the night-time visualisations need to be treated with
caution as, while they provide some indication of effects, they generally do not replicate the
levels of brightness that can be experienced in the field. It is useful to note the differences
between the night-time visualisations prepared for this application and the recently submitted
Clachaig Glen wind farm application. Both applications feature similar lighting specifications
with directional intensity mitigation accounted for in the generation of the night-time
visualisations. However, while viewpoint N2 (Rowan EIA-R) and viewpoint 8 (Clachaig Glen
EIAR) lie at similar elevations, the Rowan visualisations depict a much more subdued lighting
scheme. This is surprising especially given the increased distance of viewpoint 8 from the
Clachaig Glen proposal (8.94km as opposed to 3.7km). 
The Council’s landscape consultant considers that the night-time lighting would increase the
duration of adverse effects and that these effects may be significant from the waters and
south-eastern shores of West Loch Tarbert where lit turbines would introduce new sources of
lighting into a relatively dark environment. 
Cumulative landscape and visual effects - Significant cumulative landscape and visual effects
would occur where this proposal would be seen together and sequentially with the operational
Freasdail wind farm and the consented Airigh wind farm in views from the Kennacraig to Islay
ferry and from the A83 in the West Loch Tarbert area. 
The addition of this proposal to a scenario which includes the Freasdail, Airigh and the
application-stage Sheirdrim wind farm would also incur significant adverse cumulative effects
from the Kennacraig to Islay ferry and on views from the A83, settlement and from footpaths
on the south-eastern coastal fringes of West Loch Tarbert and the north Kintyre uplands. The
effect of this scenario would be one where wind turbines would form a key defining feature of
the West Loch Tarbert landscape, significantly detracting from the scenic qualities of the loch
and its diverse shores. 
This proposal would also be seen in combination and sequentially with the operational
Srondoire and Allt Dearg wind farms and the application-stage Earraghail wind farm from parts
of Loch Fyne and its eastern shores. Screening by landform generally restricts the extent of
visibility of the Rowan turbines in views from the east and this, together with the wide spacing
between developments and intermittent screening by roadside vegetation, would limit
cumulative effects from the B8000 north of Portavadie. Significant landscape and visual
cumulative effects would not occur from Portavadie and the Ardlamont Peninsula. 
This proposal will contribute to significant sequential effects on views from the Kintyre Way
but would generally have a lesser effect than operational and consented wind farms, and the
application-stage Narachan and Earraghail wind farms, which are sited closer to this long-
distance route. 
The application-stage Narachan wind farm, which also features visible aviation lighting, would
be principally seen together in more distant views from parts of north Arran, Gigha and the
largely unsettled Kintyre uplands. In terms of cumulative night-time effects, this proposal would
have a lesser and minimal effect when seen together with the Narachan wind farm in views
from these locations due to its greater distance (the Earraghail wind farm Applicant is
committing to an Aircraft Detection Lighting System (ADLS) and, as this would significantly
reduce the duration of night‐time lighting, this scheme is therefore considered unlikely to
contribute to significant cumulative lighting effects). 
Conclusions - the proposed development site lies within the Knapdale Upland Forest Moor
Mosaic LCT which covers much of the Knapdale area between West Loch Tarbert and the
southern edge of the Knapdale National Scenic Area. This landscape has a simpler landform

Page 28

in the south-west but is complex and craggy in the north-east. The operational Allt Dearg and
Srondoire wind farms occupy a prominent location in the LCT. The consented Airigh wind
farm, while comprising larger turbines, is associated with the more subdued terrain occurring
in the south-west of this LCT. 
This proposal, which comprises very large turbines of up to 200m, would be sited in a basin
which reduces its prominence and intrusion seen from Loch Fyne and from the settled eastern 
2 The Earraghail wind farm applicant is committing to an Aircraft Detection Lighting System
(ADLS) and, as this would significantly reduce the duration of night‐time lighting, this scheme
is therefore considered unlikely to contribute to significant cumulative lighting effects coastal
fringes of this loch. The containment provided by landform is diminished in views from the
south around West Loch Tarbert however where turbines would be visible in closer proximity
and where their scale would be more appreciated due to greater visual exposure and because
they would be seen in close conjunction with the smaller scale settled loch fringes. 
Visibility from the northern shores of West Loch Tarbert will be minimal and while this proposal
would be visible from parts of Gigha, the Ardpatrick Point area and from the west Kintyre coast,
it would not have a significant effect due to the greater distances involved and also because
of the presence of the consented Airigh wind farm which is more prominent in some of these
views. The greatest degree of visibility (and intrusion) would occur from the waters of West
Loch Tarbert, from its south-eastern coastal fringes and from parts of the northern Kintyre
uplands. 
Significant adverse effects would occur on the following landscape/seascape character areas: 
 The Knapdale Upland Forest Moor Mosaic LCT extending approximately 2km from the
proposed wind farm site 
 The Rocky Mosaic LCT where it covers the south-eastern shores of West Loch Tarbert 
 The West Loch Tarbert Local Coastal Character Area. 
The significant adverse visual effects associated with the proposal would principally affect
views in the West Loch Tarbert area as follows: 
 The A83 where it is aligned on the south-eastern coastal fringe of West Loch Tarbert. This
road is an important tourist route forming part of National Cycle Network 78 and the Kintyre
66. 
 The Kennacraig to Islay ferry route within inner West Loch Tarbert 
 Footpaths in the Dun Skeig area and from a section of the Kintyre Way. 
In the above views, this proposal would be seen simultaneously or sequentially with the
operational Freasdail and consented Airigh wind farms. 
This proposal would be one of the first wind farm proposal to introduce lighting to the dark
skies of Kintyre and while the intensity of lights will reduce when seen from lower elevation
coastal fringes, the Council’s landscape consultant considers that they would still be clearly
seen from these more settled and frequented areas and that they may extend the duration of
significant adverse effects on views from the West Loch Tarbert area. The potential cumulative
effects of visible aviation lighting on character and views are a concern given the number of
recent applications for turbines >150m in Argyll & Bute requiring such lighting although it
should be noted that the recent Earraghail wind farm application is committed to the adoption
of an Aircraft Detection Lighting Strategy (ADLS) which would substantially reduce the
duration of night-time lighting. 
Cumulative landscape and visual effects with the application-stage Sheirdrim wind farm are a

Page 29

key concern. If the Sheirdrim proposal is consented on appeal the Council’s landscape
consultant considers that the addition of this proposal would result in a major adverse
combined cumulative effect on the West Loch Tarbert area significantly affecting its character
and views from the A83, settlement, footpaths and the Islay ferry.  
It is recommended that this proposal should be objected to on landscape and visual grounds
principally because of its prominent location in relation to West Loch Tarbert and its sensitive
coastal fringes, including impacts on views from key transport routes which are important for
visitors. 
Key visualisations for the Committee to see include: 
 Figure 6.4 Detailed ZTV 10km 
 Figure 6.9 ZTV with Landscape Planning Designations 
 Viewpoint 9 Portavadie (note that fewer turbine hubs would be visible when compared
with the Earraghail wind farm proposal) 
 Viewpoint 12 Kilfinan (demonstrates the siting of the wind farm in a dip provides greater 
screening of turbine bases in views from the east) 
 Viewpoint 10: A83 near Gartnagrenach (a scenic view across West Loch Tarbert) 
 Viewpoint 19: A83 Whitehouse (effects on views to the high ridge on Knapdale) 
 Viewpoint 11: Dun Skeig 
 Clachaig Glen EIA-R – Viewpoint 8 Night-time visualisation Figure 8.5 and Viewpoint
N2 in the Rowan EIA-R (to enable comparison between night-time visualisations) 
Applicant’s response to ABC Landscape Comments - the Applicant advised the ECU that they
wished to provide further comment on the landscape objection provided by the Council’s
landscape consultant.  Furthermore, that they have prepared four documents in response: a
written request to the objection, which gives their view on the intermittent nature of significant
effects (as quoted in the objection) with evidence from the EIAR, and places the objection in
the context of the adopted LDP, SPP and tilted balance; a new ZTV which shows the extent
of theoretical visibility to blade tip out to 15km when incorporating forestry.  This fully
demonstrated the screening afforded to this site; a new ZTV which shows the above, but for
hub height; and a revised Figure 6.17a which places the sequential assessment for the A83
into categories of where you can see it (in green), and where you cannot. The Applicant has
advised that they wish the committee to consider this response prior to reaching a decision on
this proposal. It is available on the ECU website by following this link: Rowan WF Landscape
response_May2022_final (004) (1).pdf 
Argyll & Bute Council Landscape Consultant - was consulted further on the Applicant’s rebuttal
to the Landscape & Visual review and has provided the following further advice: 
The Landscape and Visual Review (LV Review) focusses on identifying the principal
landscape and visual effects of the proposal. It was undertaken on the basis of field
assessment and its conclusions were informed by comparison of the landscape and visual
effects of similar wind farm proposals across Argyll & Bute and other parts of Scotland. The
LV Review does not provide a detailed Landscape and Visual Impact Assessment as an
alternative to that included in the Environmental Impact Assessment Report (EIA-R) for the
Rowan wind farm proposal. This would not be possible or appropriate given limited resources
and time constraints. It provides an overview of the key landscape and visual effects of the
proposal on Argyll & Bute and is one of many other sources of information which will be
considered by Argyll & Bute Council when determining the acceptability of the proposal in
terms of the planning balance. 
Many of the points raised in the applicant’s response can be attributed to differences in
professional opinion and are therefore not argued further here. There are three matters

Page 30

addressed in the Applicant’s response which merit further comment and clarification as
follows: 
 Effects on the Rocky Mosaic Landscape Character Type - The LV Review states that ‘The
LVIA concludes that effects (considered in a baseline which includes the operational Freasdail
wind farm) would be significant along the southern coast of West Loch Tarbert. The Council’s
landscape consultant agrees that the effects of this proposal would be significant and adverse
on the part of the Rocky Mosaic LCT lying on the south-eastern side of West Loch Tarbert’.
While it is accepted that the LVIA does not judge the effects of the proposal on this LCT to be
significant, either ‘individually’ or cumulatively with the operational Freasdail wind farm, it is
the view of the Council’s landscape consultant that this proposal would incur a significant
adverse additional cumulative effect on the character of part of the Rocky Mosaic LCT (broadly
equating to Unit B identified in the LVIA). 
 With reference to paragraph 2.12, just because the author of the Applicant’s response deems
the effects to be ‘localised’ this does not mean that they are not important. There are very few
wind farm proposals which have, what could be termed as, more widespread ‘regional’ effects. 
 Visible Aviation Lighting - This is a rapidly changing technology with no similar specification
of lighting on operational wind turbines to enable judgements as to likely night-time effects to
be made in the field. The examples stated in paragraph 1.3.28 of the updated Technical
Appendix 6.3 as having been visited by the LVIA team are also acknowledged as not having
the same specification of visible aviation lighting as the proposal. Comparison of the night-
time visualisations produced in a cross-section of current EIA-Rs reveal a divergence in the
nature of visualisations and the findings on the significance of effects. In particular, review of
the recently submitted Clachaig Glen II wind farm proposal demonstrates the disparity
between the depiction of lighting effects despite directional intensity mitigation having also
been taken into account in the generation of the visualisations and visualisations produced
from similar viewpoint elevations. It is only correct that a precautionary approach should be
taken in appraising wind farm applications with visible aviation lighting given the low-lighting
levels present in Argyll & Bute and the potential for cumulative effects to arise with other
proposed wind farms featuring such lighting. 
Conclusion – it is acknowledged that all wind farms will have significant adverse landscape
and visual impacts but what is important to consider is the nature and degree of severity of
these effects in making recommendations to the Council. The LV Review provides an impartial
analysis of likely significant adverse landscape and visual effects but also the mitigating
features of the proposal are clearly noted, for example the limited visibility of turbines in views
from the east across Loch Fyne. It is not appropriate for the Applicant to determine the
acceptability of the proposal in landscape and visual terms, as this can only be determined by
the decision maker (the Council in this instance) upon receipt of the full range of information
which needs to be considered in the planning judgement. 
NatureScot - have advised the ECU that the nature and scale of the proposal in this location
cannot be accommodated without significant adverse landscape and visual effects, including
cumulative effects and night time effects. Significant adverse effects of the proposal are
predominantly in relation to the West Loch Tarbert (WLT) area, in particular the waters of WLT
and the southeast coast (west coast and uplands of northern Kintyre). In NatureScot’s view,
turbines of this scale in this location, would detract from the character, scenic views and
experience of West Loch Tarbert area as currently enjoyed by tourists and residents.
NatureScot consider the proposal would also have some significant effect on the appreciation
of the relatively dark skies in this area as a result of the introduction of turbine lighting with the
potential for significant cumulative effects with the wind farm proposals (>149.9m high)
requiring aviation lighting on nearby Kintyre.

Page 31

North Ayrshire Council have advised the ECU that in this instance, they leave the comments
relating to impacts on North Arran NSA and the Wild Land Area to NatureScot. 
West Kintyre Community Council have advised the ECU that they object to this proposal on
the grounds of Landscape and Visual Impact. 
Tarbert & Skipness Community Council have advised the ECU that they object to the proposal
on the grounds that the proposal will have an adverse landscape and visual impact. 
East Kintyre Community Council have advised the ECU that they object to the proposal on the
grounds of visual amenity due to cumulative harmful visual impacts contrary to Argyll & Bute
Council’s LDP 6 and proposed Local Development Plan 2, Diagram 7. 
Representations have been received by the ECU objecting to the proposal in this regard,
including: It is the landscape of Kintyre and Knapdale which represents the area's future
economic wellbeing. Wind farms, new power lines and the miles of tracks they seem to need
are destroying the landscape and the special feel of remoteness of the area. They contribute
almost nothing to anyone locally but do enrich landowners who almost all live elsewhere.
Visitors to the area cannot understand the lack of value accorded the special quality of the
area. When it is gone perhaps some of those involved in its destruction may come to
appreciate what they have done?; and the adverse visual impact on the view north along West
Loch Tarbert from Gartnagrenach (special often photographed and commented on by visitors
and enjoyed by locals). This proposal would be visible from very many places especially in
Kintyre and especially from Gartnagrenach. 
Representations have been received by the ECU in support of the proposal in this regard
including: whilst there are other wind farm schemes in Argyll & Bute, the Applicant has
demonstrated that another wind farm can be accommodated in this location; and whilst
perhaps not every wind farm is well placed, it is our view that this wind farm brings more
benefits than harm to our local area. 
All of the above consultee advice and representations have been considered, as well as the
Applicant’s rebuttal to the advice of the Council’s landscape consultant.   Officers concur with
the expert advice of NatureScot and the Council’s landscape consultant in respect to
landscape and visual impacts (including cumulative). 
Having due regard to the above it is concluded that the proposal will have adverse
landscape and visual impacts (including cumulative) and is therefore inconsistent with
the provisions of: SG LDP ENV 13 – Development Impact on Areas of Panoramic
Quality; SG LDP ENV 14 –Landscape; SG 2 Renewable Energy; LDP STRAT 1 –
Sustainable Development; LDP DM1 – Development within the Development
Management Zone; LDP 3 – Supporting the Protection, Conservation and Enhancement
of our Environment; Policy LDP 6 – Supporting the Sustainable Growth of Renewables;
LDP 9 – Development Setting, Layout and Design;  of the Argyll & Bute Local
Development Plan; SPP (2014); and the Onshore wind policy statement, (2017). 
It is therefore recommended that Argyll & Bute Council object to the proposal on the
grounds of adverse: Landscape Impact, Visual Impact, and Cumulative landscape and
visual effects. 
K. EFFECTS ON NATURAL HERITAGE INCLUDING BIRDS (INCLUDING CUMULATIVE
IMPACTS)

Page 32

Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for wind turbine developments to be assessed against any
impact they may have on natural heritage including birds. 
Designated Sites 
NatureScot have advised the ECU that at the scoping stage, they considered that the site
would have hydrological connectivity with the Glen Ralloch to Baravalla Woods SSSI
(designated for its bryophyte and lichen assemblages and upland oak woodland) and the
Tarbert Woods SAC (designated for Western acidic oak woodland). A key feature of
importance for this woodland habitat is the well-developed Atlantic bryophyte communities it
supports. The numerous streams which traverse the SAC have in places cut deep ravines,
and together with the sheltered north-east aspect, these provide very humid conditions which
support up to 180 species of bryophyte species, many of which are nationally and
internationally important. 
As such, NatureScot asked that the Applicant provide a construction method statement
alongside the EIA Report (EIAR) which would set out specific measures to prevent
sedimentation and contamination of watercourses within the site. However, this information
was not provided when the EIAR was submitted in February 2022. As a result, NatureScot
requested further information from the Applicant on the 14th April 2022 to help complete their
appraisal of the proposal on the SSSI and SAC. A draft Construction Environmental
Management Plan (CEMP) was received on the 26th May 2022. 
NatureScot’s advice is that this proposal is likely to have a significant effect on the western
acidic oak woodland feature of the Tarbert Woods SAC. Consequently, the Energy Consents
Unit, as competent authority, is required to carry out an appropriate assessment in view of the
site’s conservation objectives for its qualifying interest. To help the ECU do this, they advise
that on the basis of the information provided to date, if the proposal is carried out strictly in
accordance with the mitigation outlined in the draft CEMP, their conclusion is that the proposal
will not adversely affect the integrity of the site. NatureScot also consider that the measures
provided in the draft CEMP will also prevent any adverse effects on the objectives of the Glen
Ralloch to Baravalla Woods SSSI or the overall integrity of the area. NatureScot also advise
that they should be consulted on the final CEMP produced ahead of construction works
commencing. 
Ornithology 
NatureScot - have advised the ECU that they are generally content with the assessment of
the proposal on the key ornithological receptors and the proposed embedded mitigation
measures. NatureScot note that survey work was undertaken from 2018 to 2020 whilst the
EIAR was not submitted until 2022. This has resulted in no breeding season checks for 2021
which is disappointing given the sensitivity of the site for breeding osprey and red-throated
divers in particular. They also note that the vantage points (VP) for flight activity surveys do
have significant overlap and that there are some VPs located within the turbine array which is
contrary to their guidance. There is some use of overlapping VPs being surveyed at the same
time which is also contrary to their guidance and which could mean that the collision risk
modelling calculations may not be 100% accurate, however the incidents of this appear to be
low level. 
Golden Eagle - NatureScot welcome the provision of GET modelling provided in support of
the application and they agree that the proposal is unlikely to result in a significant loss of
suitable golden eagle range. They note that there is a potential deer poaching issue on the
site which may be making gralloch more available to eagles. It’s important that poaching is

Page 33

preventing from within the wind farm site as gralloch could attract eagles into the wind farm
area thereby increasing the risk of turbine collision. 
Osprey - NatureScot are aware of details of a number of osprey collisions to date (10 events),
which is surprising as they were largely from wind farm sites with lower osprey activity than
this proposal. As a result, there may be some, as yet unexplained, issue whereby ospreys
collide more with turbines than expected. In this location, it appears that the ospreys will be
feeding in the shallows of West Loch Tarbert in addition to Loch Chaorainn and some of the
variation in activity at Loch Chaorainn may be due to weather conditions /fish availability at
other feeding sites rather than failed or successful breeding. 
From the flight activity data, NatureScot are concerned that the main flight paths for ospreys
passes T4, T9 and T13 and this, coupled with the greater number of collisions than expected,
does cause for some concern. NatureScot consider that T4, in its current location, also poses
a likely greater collision risk for red-throated divers (see below), and therefore they strongly
suggest that this turbine is either re-sited or removed from the application. 
Red-Throated Divers - The EIAR indicates that red-throated divers (RTD) predominately fish
on larger lochs during the breeding season, and whilst some RTDs will do this, for most birds
the majority of feeding, especially when they have chicks, tends to be in the marine
environment. In Argyll, it is clear from a number of wind farm proposals that the population
fluctuates annually and that there is quite high use of lochs, especially from June/July onwards
until early autumn by failed or non-breeding pairs plus a lot of socialising. 
NatureScot consider that the interpretation made in the EIAR that Loch Chaorainn is an
important feeding loch is probably not correct, especially as the consultants have identified
two clear flight routes in and out of the wind farm area towards the east coast of Knapdale and
to West Loch Tarbert which look typical of other Kintyre wind farm surveys for divers. 
They are also aware from other wind farm work in Argyll that divers do not always get
displaced from lochs close to wind farm sites. They welcome the commitment to provide a raft
near the islands in Loch Chaorainn as this may limit the risk of loch abandonment. They note
that Canada geese were recorded on Loch Chaorainn in April 2020 and, although no breeding
evidence was recorded at that time, these geese do tend to breed on rafts which can deter
RTD usage of rafts. 
As with ospreys, it appears as though T4 is located on the main flight path out of Loch
Chaorainn for RTDs and removal or re-siting of this turbine would likely significantly reduce
the potential collision risk for these birds. 
Habitat Management Plan (HMP) - NatureScot welcome the provision of draft HMP and they
have a number of comments to make on some of the commitments proposed: 
 Native broadleaved shelter belt at Loch Chaorainn Beag – this loch appears to be quite
sheltered already and NatureScot consider that planting a shelter belt may reduce the loch’s
attractiveness to RTD as it can make it feel more enclosed, provides cover for predators and
can make the shoreline less suitable for nest sites. As such, they do not consider that this
measure will be beneficial for RTD. 
 Monitoring and restocking of fish – NatureScot do not consider that Loch Chaorainn is as
important a feeding loch for RTDs as the EIAR suggests. However the loch does appear to be
important for feeding osprey. The HMP should demonstrate this measure and how feasible it
is to achieve. The proposed restocking of fish would need to consider the species and size of
fish to be restocked as RTDs would require small fish for their chicks. Restocking with larger
fish may negatively impact small fish abundance if they predate them which could have a
negative impact on RTDs.

Page 34

 NatureScot welcome the commitment to install a diver raft on Loch Chaorainn, although they
note that this loch is outside of the red line boundary and so assurances should be made in
the HMP that the raft can be deployed here. One of the main reasons why rafts can fail as a
measure of diver mitigation is due to a lack of maintenance and therefore the HMP should
commit to a regular programme of maintenance over the lifetime of the wind farm. Control of
Canada geese, if using the raft, should also be undertaken over the lifetime of the wind farm.
This would involve yearly checks prior to the breeding season. 
 Eagle feeding stations - NatureScot consider that the main aim of any supplementary feeding
is to help improve the birds’ condition over the winter, with live prey being much more important
for the breeding season and rearing healthy chicks. Some supplementary food in the winter
period may be of some benefit but they do not consider that it should be provided all year
round. Golden eagles have a wide diet (including a large range of mammals and birds) and
the typical view of grouse / lagomorphs and carrion being the main food sources for eagles is
outdated. It is important to note that any carcasses provided must be lead free. 
 NatureScot note that a relatively small area of wet heath / blanket bog is proposed for
restoration under the draft HMP. They consider that the HMP could look to be more ambitious
in its aims for habitat restoration and considers improving the open ground habitats around
the west and south-west of the wind farm area within their red line boundary. 
Curtailment of Turbine 4 – in response to NatureScot’s advice that consideration should be
given to moving or deleting turbine 4, the Applicant submitted a Technical Note: Rowan Wind
Farm- Curtailment of Turbine 4 (10th July 22) to the ECU.  Moving the turbine is not an option
as it would introduce unwanted effects elsewhere, and based on the collision risk estimates in
the EIA, the Applicant did not feel deletion is a proportionate response.  As a compromise
solution, the technical note sets out a rationale for curtailment of Turbine 4 during sensitive
periods. 
NatureScot have advised the ECU that they have considered the Technical Note on the
proposed curtailment of Turbine 4 (T4) in order to minimise collision risk for ospreys and red-
throated divers.  NatureScot welcome the Applicant’s commitment to curtail the operation of
T4 so that it only operates between sunset and sunrise, thereby avoiding the more sensitive
daylight hours when these species are likely to be feeding  and commuting between hill lochs
and West Loch Tarbert.  NatureScot also advise that they would be happy to discuss possible
monitoring of the effects of curtailment as part of any post consent discussions. It is considered
that the curtailment of T4 should be secured by an appropriate planning condition, and this is
reflected in the recommendation for the ECU. 
The Royal Society for the Protection of Birds Scotland (RSPB) - has advised the ECU that it
does not object to this proposal but provides advice, in relation to biodiversity and habitat
management to minimise and ensure any impacts are fully mitigated and that biodiversity
benefits are achieved. RSPB ask that conditions to secure: a Bird Protection Plan; Habitat
Management Plan; an appropriately qualified and experienced Ecological Clerk of Works
(ECoW); and, an appropriate programme of post-construction monitoring are attached to any
consent. 
Ecology 
NatureScot have advised the ECU that they are generally satisfied with the assessment of the
impacts of the proposal on non-avian protected species and habitats and the proposed
mitigation. They are also content with the proposed compensation and enhancement
measures. They also note that a micro-siting allowance of 100 m has been sought by the

Page 35

Applicant. Micro-siting should be utilised to avoid areas of deep peat whilst maintaining the
appropriate buffer distances of sensitive ecological features within the site e.g. watercourses
and woodland edges. 
Bats - It is unclear from the information presented in Technical Appendix 8.4 if bat emergence
surveys were undertaken for the seven trees identified as having low – high bat roost potential.
These trees are located close to the proposed access to the proposal from the B8024.  It’s not
clear how many (if any) of these trees will required to be felled, but inspection surveys must
be undertaken and bat licences sought if required ahead of any felling works. 
Invasive Non-Native Species - NatureScot note that the habitat surveys recorded a stand of
Japanese knotweed alongside an existing track within the site as well as stands of American
skunk cabbage out-with the site boundary. Measures should be included in the CEMP to
ensure that these species are managed appropriately and not being allowed to spread in the
wild as a result of the construction works. 
The Council’s Local Biodiversity Officer – has no objection to this proposal, advice is provided
in relation to biodiversity interest, surveys, mitigation, construction environment management
and overseeing, habitat management and restoration protocols.  The Local Biodiversity Officer
recommends monitoring of the condition of the structures (culverts/bridge), that silt catchment
measures are effective and that a log of any incidents of contamination are kept.  The Local
Biodiversity Officer requests that: an ornithological watching brief is kept and any collisions
are recorded and submitted to NatureScot, the planning authority and the RSPB; and the
applicant drafts an eradication plan for the following species: Japanese knotweed
rhododendron; montbretia; and butterfly bush and submits it to the planning authority as this
supports biodiversity enhancements. 
Fish 
Fisheries Management Scotland (FMS) - advised the ECU that their remit is confined to
alerting the relevant local DSFB/Trust to any proposal. The proposal falls within the catchment
relating to the Argyll DSFB and the Argyll Fisheries Trust. The proposals should be conducted
in full consultation with the local DSFB & Trust. Due to the potential for such developments to
impact on migratory fish species and the fisheries they support, FMS have developed, in
conjunction with Marine Scotland Science, advice on terrestrial wind farms for DSFBs and
Trusts in dealing with planning applications which should be fully considered. 
Argyll District Salmon Fishery Board - have advised the ECU that they have no objection
subject to conditions to ensure: comprehensive pre and post development monitoring
(electrofishing surveys of juvenile fish populations) is undertaken to ensure Argyll DSFB
that all habitat and fish populations are unaffected by the development; as part of any
development, all conifer trees are to be removed from riverbanks and measures taken to
regenerate native broadleaf trees; and all stream crossings are conducive to the upstream
and downstream movement of all fish. 
Forestry 
In Scottish Forestry (SF) consultation response to the Applicant’s clarification they advised the
ECU that they are content that the proposal meets the UKFS species diversity requirements
and confirm that they have no outstanding issues with the proposal. Planning conditions to
secure Compensatory Planting and a Long Term Forest Plan in the event the proposal
receives consent are also recommended.

Page 36

SEPA – Forestry Waste Management – SEPA have advised the ECI that there’s no indication
the proposals will involve the felling of forest material to waste at this stage although they
understand the method of woodland clearance will be determined at the time of construction
(including whether harvesting for the biomass market is possible). As per Chapter 14 of the
EIAR, such works should follow SEPA’s guidance on the Management of Forestry Waste and
Use of Trees Cleared to Facilitate Development on Afforested Land. 
Micrositing 
SEPA advice on Micrositing – SEPA has advised the ECU that they note a 100m micrositing
allowance is proposed and request a condition requiring that, unless otherwise confirmed by
the determining authority in consultation with SEPA, any proposed micrositing be subject to
the following restrictions: no micrositing shall take place within a 50m buffer distance of a
watercourse; no micrositing shall take place within areas of peat of greater depth than the
original location; and no micrositing shall take place within the buffers identified for PWS. 
Crown Estate Scotland have advised the ECU that the assets of Crown Estate Scotland are
not affected by this proposal and they have no comments. 
Having due regard to the above it is concluded that subject to the conditions
recommended by NatureScot, RSPB, Argyll District Salmon Fishery Board, SEPA,
Scottish Forestry and the Council’s Local Biodiversity Officer the proposal is
acceptable in terms of natural heritage and birds and is consistent with the provisions
of SG LDP ENV 1 – Development Impact on Habitats, Species and Our Biodiversity (i.e.
biological diversity); SG LDP ENV 7 – Water Quality and the Environment; SG 2
Renewable Energy; LDP STRAT 1 – Sustainable Development; LDP DM1 – Development
within the Development Management Zone; LDP 3 – Supporting the Protection,
Conservation and Enhancement of our Environment; Policy LDP 6 – Supporting the
Sustainable Growth of Renewables of the Argyll & Bute Local Development Plan; SPP;
Onshore wind policy statement, Scottish Government (January 2017); The Scottish
Government’s Policy on ‘Control of Woodland Removal’ (Forestry Commission
Scotland 2009); 
L. IMPACTS ON CARBON RICH SOILS, USING THE CARBON CALCULATOR (INCLUDING
CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, Supplementary Guidance
2 and SPP require applications for renewable energy developments to be assessed against
any impact they may have on carbon rich soils, using the carbon calculator. 
Spatial Framework (SPP & SG2) – In terms of the Council’s Spatial Framework for wind farms
(Supplementary Guidance 2: Wind Farm Map 1 - Figure 1 Spatial Framework for wind turbines
over 50 metres to blade tip), the proposal lies predominately within a Group 3 area (area with
potential for wind farm development subject to other policy consideration), with its western
edge being in a Group 2 area (Area of significant protection) owing to its classification as an
area of Class 2 Carbon Rich Soil and Peat. In Group 2: Areas of significant protection – wind
farms may be appropriate in some circumstances.  Further consideration will be required to
demonstrate that any significant effects on the qualities of these areas can be substantially
overcome by siting, design or other mitigation.  Group 3: Areas are likely to be acceptable,
subject to detailed consideration against identified policy criteria. 
NatureScot’s advice on Peat – NatureScot have advised the ECU that they are content with
the assessment of the proposal on the peat resource and note that efforts have been made in
the design of the wind farm to avoid areas of deep peat. They are also content with the

Page 37

measures detailed in the Outline Peat Management Plan (OHMP) with regards to the storage
and reuse of peat on site. 
SEPA – Disturbance and Re-use of Excavated Peat – SEPA have advised the ECU that they
acknowledge and welcome the work undertaken on the peat surveys and planning of the site
design to avoid areas of deep peat as reported in the EIAR. They have reviewed the Outline
Peat Management Plan (oPMP) and acknowledge this covers everything expected
(micrositing, floating tracks, peat storage plans). SEPA are satisfied with the assessment so
far and peat management proposals in principle. The oPMP states that details of temporary
peat storage locations will be provided. It would be expected that this would include a map
showing the peat storage areas, demonstrating that the storage areas are not on high value
habitats, or in proximity to waterbodies, or on sloping ground. SEPA request, a condition
requiring the preparation and submission of an updated PMP for approval to the determining
authority, in consultation with SEPA, prior to commencement of the development. This should
demonstrate how also micrositing and other measures have been used to further minimise
peat habitat disturbance. 
Ironside Farrar on behalf of the ECU – have advised the ECU that the PLHRA requires minor
revisions: although much of the PLHRA is sound, one or two key elements are considered to
be insufficiently robust to support the PLHRA conclusions and minor revisions are required;
areas for attention will be advised in the review findings and may be progressed by the
developer through either an appendix to the original submission or by clarification letter.
Technical Appendix 10.2 Peat Slide Hazard and Risk Assessment was submitted to the ECU
by the Applicant on the 8th August to provide the clarification sought by Ironside Farrar in their
consultee response (26 April 2022).  At time of writing Ironside Farrar have not confirmed to
the ECU whether or not this document addresses their comments. A response is anticipated
week commencing 26th September 2022.   
Having due regard to the above, subject to the recommended conditions it is concluded
that the proposal will not have an adverse impact on carbon rich soils, using the carbon
calculator and is therefore consistent with the provisions of SG LDP ENV 1 –
Development Impact on Habitats, Species and Our Biodiversity (i.e. biological
diversity); SG LDP ENV 11 – Protection of Soil and Peat Resources; SG 2 Renewable
Energy; LDP STRAT 1 – Sustainable Development; LDP DM1 – Development within the
Development Management Zone; LDP 3 – Supporting the Protection, Conservation and
Enhancement of our Environment; Policy LDP 6 – Supporting the Sustainable Growth
of Renewables of the Argyll & Bute Local Development Plan; SPP (2014); Onshore wind
policy statement, (January 2017). 
M. PUBLIC ACCESS, INCLUDING IMPACT ON LONG DISTANCE WALKING AND CYCLING
ROUTES AND THOSE SCENIC ROUTES IDENTIFIED IN THE NPF (INCLUDING
CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against any
impact they may have on public access, including impact on long distance walking and cycling
routes and those scenic routes identified in the NPF. 
New pedestrian, cyclist and recreational use of the wind farms tracks are proposed to be
provided following commissioning of the wind farm, associated facilities including a10-vehicle
informal car park, interpretive boards, benches and bins along with signage.  This access is
intended to be provided to at least turbines 4 and 9, and would be around a 10km walk or
cycle to turbine 9 and back to the car park using the finished turbine delivery tracks. The car
park, tracks and bins would be subject to a maintenance contract to be awarded locally if
possible.

Page 38

Having due regard to the above it is concluded that the proposal will not have  any
adverse physical impacts on public access, including impacts on long distance walking
and cycling routes and those scenic routes identified in the NPF and is therefore
consistent with the provisions of SG 2 Renewable Energy, SG LDP TRAN 1 – Access to
the Outdoors; LDP STRAT 1 – Sustainable Development; LDP DM1 – Development
within the Development Management Zone; LDP 3 – Supporting the Protection,
Conservation and Enhancement of our Environment; Policy LDP 6 – Supporting the
Sustainable Growth of Renewables of the Argyll & Bute Local Development Plan; SPP
(2014); Onshore wind policy statement, (January 2017). 
N. IMPACTS ON THE CULTURAL HERITAGE, INCLUDING SCHEDULED MONUMENTS,
LISTED BUILDINGS AND THEIR SETTINGS (INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against any
impact they may have on the historic environment, including scheduled monuments, listed
buildings and their settings.   
Historic Environment Scotland (HES) – have advised the ECU that they have no objection to
the proposal. 
The West of Scotland Archaeology Service (WOSAS) – have advised that they have no
objection subject to condition to secure the approval of a written scheme of archaeological
investigation, to be fully implemented to the satisfaction of the Planning Authority. 
Having due regard to the above it is concluded that based on the advice of Historic
Environment Scotland and the West of Scotland Archaeology Service that, subject to a
condition to secure a scheme of archaeological investigation that this proposal is
consistent with the provisions of SG LDP ENV 15 – Development Impact on Historic
Gardens and Designed Landscapes; SG LDP ENV 16(a) – Development Impact on Listed
Buildings; SG LDP ENV 19 –Development Impact on Scheduled Ancient Monuments;
SG LDP ENV 20 – Development Impact on Sites of Archaeological Importance; LDP 3 –
Supporting the Protection, Conservation and Enhancement of our Environment; Policy
LDP 6 – Supporting the Sustainable Growth of Renewables; and SG 2 Renewable
Energy of the Argyll & Bute Local Development Plan; SPP (2014); the Onshore Wind
Policy Statement and Historic Environment Policy for Scotland (April 2019) in this
respect. 
O. IMPACTS ON TOURISM AND RECREATION (INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against any
impact they may have on tourism and recreation. 
The Council also regards landscape as being a particularly valued asset both in terms of its
intrinsic qualities and in terms of its value to the tourism economy. For all types of development
the maintenance of landscape character is an important facet of decision-making in the
countryside in Argyll & Bute, regardless of the scale of development proposed. The Council’s
LDP Policy LDP 6 identifies impacts on tourism and recreation as a material consideration in
the assessment of renewable energy developments on the basis that inappropriate
developments with significant adverse effects which contribute to the degradation of
landscape character are unlikely to be in the interests of the Argyll tourism economy.

Page 39

West Kintyre Community Council (WKCC) – have advised the ECU that they object on the
grounds of Tourism Impact. 
East Kintyre Community Council – have advised the ECU that they object to the proposal on
the following grounds of Community Development Amenity due to the wholesale harmful
impacts to a designated Tourism development area. 
Tarbert & Skipness Community Council have advised the ECU that they object to the proposal
on the grounds that the proposal will have an adverse tourism impact. 
Representations have been received by the ECU objecting to the proposal in this regard,
including: adverse Impact on Tourism & Recreation and associated economic impact - this
application would be directly in front of Tarbert Holiday Park which extends to 50 acres. It is
also close to West loch Shores and Escart Farm and Bay (200 acres approx). We are the
biggest accommodation provider in Kintyre and the landscape is what attracts people to this
particular area close to Tarbert. There seems to be a lot of further Wind farms proposed but I
feel this one is one too many and too close to us. It will also significantly financially affect the
future income of the businesses.   
The concerns expressed in regard to the adverse landscape and visual impact this proposal
will have on tourism have been taken into account.  As these two matters are intrinsically
linked, and there is little evidence to demonstrate whether or not wind farms adversely affect
tourism, it is considered that such impacts are covered in the landscape and visual impact
assessment of the proposal and recommended reason for objection. 
Having due regard to the above, in terms of the impacts on tourism and recreation the
proposal is considered to be consistent with the provisions of: SG LDP TRAN 1 –
Access to the Outdoors; LDP STRAT 1 – Sustainable Development; LDP DM1 –
Development within the Development Management Zone; LDP 3 – Supporting the
Protection, Conservation and Enhancement of our Environment;  Policy LDP 6 –
Supporting the Sustainable Growth of Renewables; SG LDP ENV 14 –Landscape; and
SG 2 Renewable Energy of the Argyll & Bute Local Development Plan, SPP (2014) and
the Onshore Wind Policy Statement in this respect. 
P. AVIATION, DEFENCE AND SEISMOLOGICAL RECORDING (INCLUDING CUMULATIVE
IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against any
impact they may have on Aviation, Defence and Seismological Recording. 
Defence Infrastructure Organisation/ Ministry of Defence (MOD) – have advised the ECU that
they have no objection to the proposal subject to conditions to secure: aviation lighting and
aviation charting & safety management. 
Civil Aviation Authority – have advised the ECU that the proposed development has 13
turbines, with turbine heights at 200m ground to tip. This brings them into scope of the Air
Navigation Order Article 222 requirements for obstacle lighting at night. Based on the
information, the CAA is satisfied with the proposed lighting scheme, 
Highlands and Islands Airports Limited (HIAL) have advised the ECU that at the given position,
this development is in the vicinity of the Instrument Flight Procedures of both Islay and
Campbeltown Airports. However, their calculations  show that there is no impact to the
safeguarding criteria for Islay and Campbeltown Airports. If the proposed layout of the wind
farm does not significantly change and the maximum height, 200m, of the proposed wind

Page 40

turbines does not increase; Highlands and Islands Airports Limited has no objections to this
proposal. However, if the layout changes significantly and the turbine height increases then
Highlands and Islands Ltd would object until it is determined that there is no impact to the IFPs
of Islay and Campbeltown Airport. 
National Air Traffic Services Safeguarding (NATS) – have advised the ECU that the proposed
development has been examined by their technical safeguarding teams and conflicts with their
safeguarding criteria.  Accordingly, NATS (En Route) plc objects to the proposal.  The reasons
for NAT’s objection is that a technical impact is anticipated, which has been deemed to be
unacceptable. 
On the 22nd August the Applicant advised the ECU that the NATS aviation contract is in
progress, and that a letter saying ‘no objection’ should arrive within the next few months. 
Furthermore, that the Council should be in a position to say that mitigation is possible (Lowther
hill blanking and Tiree infill), negotiations are underway, but that contracts are unlikely to be
finalised before committee.  This is not a hurdle to the Council providing its response.  This is
a technical matter for the ECU to resolve. 
Glasgow Prestwick Airport (GPA) – have advised the ECU that the development raises
aviation safety concerns which have an operational impact on the Airport as an air navigation
services provider. Until all technical and operational aviation safety matters are addressed to
the satisfaction of the Airport, and a mitigation agreement is put in place for the life of the
windfarm, the Airport must object to this proposed development 
Applicant’s response to Glasgow Prestwick Airport’s objection (12th May 22) – the Applicant
has submitted a response to this objection to the ECU, which provides comments on: Aviation
Lighting; the Airport’s Windfarm Safeguarding Assessment Process; and Cumulative Impact. 
At time of writing it is understood that this has been sent to Glasgow Prestwick Airport by the
ECU and a further response confirming whether or not their concerns have been addressed
remains outstanding.  The ECU have asked if it would be possible to provide a response by
the 12th September to enable an update to be provided to the Council in advance of committee
and GPA advised that they would try. This is a technical matter for the ECU to resolve. 
Glasgow Prestwick Airport – further comments in response to Applicant’s 12th May email –
advise the ECU that they continue to object to this proposal.  They continue to have concern
in regard to: airspace, airport surveillance coverage and air traffic service; air space and air
traffic control; in the absence of appropriate mitigation the turbines visible to the airport’s
primary surveillance will generate clutter and render the airspace above the wind farm
unusable to Air Traffic Control; further wind farms without appropriate mitigation will
exacerbate this; and  the turbines are capable of impacting VHF reception from ATV to aircraft,
the airport requires to be satisfied that the proposal will not have an adverse impact upon VHF
communication infrastructure (further analysis required). GPA is optimistic that appropriate
mitigation of these effects will be possible and that an agreement can be reached with the
Applicant in respect of mitigation measures, which would allow GPA to withdraw its objection. 
Local Development Plan Policy is clear that developments that have an adverse impact on the
Safeguarding of Airports should be refused.   
Having due regard to the above it is concluded that due to the fact that National Air
Traffic Services Safeguarding (NATS) and Glasgow Prestwick Airport have advised the
Energy Consents Unit that they object to the proposal, it will have an adverse impact
on aviation is therefore inconsistent with the provisions of SG 2 Renewable Energy,
Policy LDP 6 – Supporting the Sustainable Growth of Renewables and SG LDP TRAN 7
–Safeguarding of Airports of the Argyll & Bute Local Development Plan, SPP (2014) and
the Onshore Wind Policy Statement in this respect.

Page 41

It is therefore recommended that Argyll & Bute Council object to the proposal due to
the adverse impact it would have on Aviation.  Furthermore, that the Energy Consents
Unit should be advised that in the event that National Air Traffic Services (NATS) and
Glasgow Prestwick Airport withdraw their objections, then Argyll & Bute Council would
no longer object on these grounds.  Furthermore, in the event that a Public Inquiry is
held that Argyll & Bute Council does not intend to give evidence on this technical
matter, and would defer to NATS and GPA in this regard. 
Q. IMPACTS ON TELECOMMUNICATIONS, BROADCASTING INSTALLATIONS AND
TRANSMISSION LINKS (INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against any
impact they may have on telecommunications, broadcasting installations and transmission
links.  BT, and the Joint Radio Company have provided confirmation to the ECU that they have
no objections to this proposal. 
Having due regard to the above it is concluded that the proposal will not have any
adverse impacts on telecommunications, broadcasting installations and transmission
links (including cumulative impacts) and is consistent with the provisions of SG 2,
Renewable Energy, Policy LDP 6 – Supporting the Sustainable Growth of Renewables
of the Argyll & Bute Local Development Plan, SPP (2014) and the Onshore Wind Policy
Statement in this respect. 
R. IMPACTS ON ROAD TRAFFIC AND ADJACENT TRUNK ROADS (INCLUDING
CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against any
impact they may have on road traffic and adjacent trunk roads.   
Site Access Junction - Access to the site will be from the B8024 and a new junction bellmouth
has been indicatively designed by Pell Frischmann. This will incorporate the grading of the
junction to fit the topography and join the existing forestry track. The over-run area would
become an informal car park for up to 10 vehicles when operational. 
Transport Scotland (TS) – have advised the ECU that they have no objection.  TS request that
conditions are attached in the event that the proposal receives consent relating to:
Construction Traffic Management Plan (CTMP) and Phased Delivery Plan; Road Condition
Review/Assessment; Abnormal Indivisible Loads Management Plan; vehicles transporting
construction material are sheeted; vehicle wheel cleaning facilities; abnormal load delivery
trial-run; approval of the proposed route for abnormal loads and any accommodation
measures; details of any additional signing or temporary traffic control measures deemed
necessary (by Quality Assured traffic management consultant); and a Decommissioning Plan. 
The Council’s Roads & Amenity Services have advised that they have no objection subject to
conditions to secure: a Traffic Management Plan; a detailed Method Statement; new passing
places; carriageway widening; carriageway widening to be soiled and seeded; report
identifying vulnerable areas of road to traffic loading (including assessment of culverts or other
structures and proposed mitigation); and a detailed roads condition survey; weekly road
inspections.  Furthermore, the Applicant should be made aware that there will be no financial
contributions from Argyll & Bute Council towards the work required to facilitate the works or to
make good any damage directly attributable to the construction of the wind farm. The Applicant

Page 42

should be made aware that they will be responsible for making good any damage to the public
roads which is directly attributable to the construction of the wind farm. Transport Scotland
should be notified as there may be work to be carried out within the road corridor of the A83
Tarbet – Campbeltown Trunk Road. A section 96 Legal Agreement will be required. The
Roads Engineer has also highlighted the following notes for intimation to the Applicant: in
terms of the Roads (Scotland) Act 1984 a Road Opening Permit (S56) will be required, and
no surface water is allowed to discharge onto the public road.  The Applicant has been made
aware of the requirements of Area Roads and confirmed that they have no issues with these
requirements. 
Having due regard to the above, subject to the relevant conditions being attached to
any consent granted by the ECU, it is concluded that the proposal  will not have any
adverse impacts on road traffic and adjacent trunk roads and the proposal is consistent
with the provisions of SG2 Renewable Energy, Policy LDP 6 – Supporting the
Sustainable Growth of Renewables; SG LDP TRAN 4 – New and Existing, Public Roads
and Private Access Regimes of the Argyll & Bute Local Development Plan, SPP and the
Onshore Wind Policy Statement in this respect.   
S. EFFECTS ON HYDROLOGY, THE WATER ENVIRONMENT AND FLOOD RISK
(INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, Supplementary Guidance
2: Renewable Energy and SPP require applications for renewable energy developments to be
assessed against effects on hydrology, the water environment and flood risk.   
SEPA – Impacts on the Water Environment – SEPA has advised the ECU that they support
the adoption of a 50m buffer between proposed infrastructure and watercourses as shown on
Figure 10.7. The Watercourse Crossing Schedule (Appendix 10.3) describes ten crossings
needed to facilitate the development. Proposals to undertake alterations to, or works on, the
bank or bed of a watercourse requires consent under the Water Environment (Controlled
Activities) (Scotland) Regulations 2011 (as amended) (CAR). While SEPA have no
consentability concerns with the majority of these crossings (which are to be bottomless arch
culverts) they request a bridging solution is implemented for Watercourse Crossing 4 as this
is approximately 4m wide. To protect the water environment, SEPA therefore request a
condition requiring that this crossing be a traditional style bridge unless otherwise agreed with
SEPA. Furthermore, a Construction Run Off Licence under CAR will also be required for
surface water run off from the construction site. That will require the applicant to have a
Pollution Prevention Plan (PPP) in place. SEPA are content to consider detailed proposals
during the CAR authorisation process 
SEPA - Groundwater Dependent Terrestrial Ecosystems (GWDTEs) – SEPA has advised the
ECU that they have considered the GWDTE assessment provided in the EIAR, including
Technical Appendix 8.1: Habitats, and agree that there are no GWDTEs on site. SEPA
acknowledge that justification for this conclusion has been provided and it seems that the
habitats present are surface water fed and a result of topography. This has also been
supported with water chemistry sampling. Other areas appear to be degraded habitat at the
plantation forest margins and these areas have been mentioned in the Habitat Management
Plan to restore degraded habitats. 
The Council’s Flood Risk Assessor – has advised that they have no objection to the proposal
subject to conditions to ensure that: watercourse crossings not to reduce the capacity of the
channel and ideally be designed to convey the 1:200 year plus climate change flow; and
Surface water drainage should be designed in accordance with CIRIA C753 and ensure that
post development surface water runoff does not exceed the pre-development surface water
runoff. The surface water drainage should be in operation prior to the start of construction.

Page 43

Having due regard to the above, subject to the relevant conditions being attached to
any consent granted by the ECU, it is concluded that the water environment and flood
risk have been considered and the proposal is consistent with the provisions of SG 2
Renewable Energy, Policy LDP 6 – Supporting the Sustainable Growth of Renewables
and SG LDP SERV 7 – Flooding and Land Erosion – The Risk Framework for
Development of the Argyll & Bute Local Development Plan, SPP (2014) and the Onshore
Wind Policy Statement in this respect.   
T. THE NEED FOR CONDITIONS RELATING TO THE DECOMMISSIONING OF
DEVELOPMENTS, INCLUDING ANCILLARY INFRASTRUCTURE, AND SITE
RESTORATION (INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, Supplementary Guidance
2: Renewable Energy and SPP require applications for renewable energy developments to be
assessed against the need for conditions relating to the decommissioning of developments,
including ancillary infrastructure, and site restoration.   
Following construction and commissioning, the proposal would be operational and generating
electricity for a period of approximately 35 years, after which it would be decommissioned and
removed, or alternatively, a further planning application could be made to extend the period of
operation. If a further application is not submitted, decommissioning would involve the total
removal of above-ground infrastructure. This would involve retention of existing access tracks
for forestry operations. Reinstatement of the site would be carried out in accordance with an
approved method statement. It is recommended that this matter is covered by planning
conditions or a legal agreement consistent with other projects across Argyll & Bute in the event
that the proposal obtains consent from the ECU.   
Having due regard to the above it is concluded that the need for conditions relating to
the decommissioning of developments, including ancillary infrastructure, and site
restoration has been considered and the proposal is therefore consistent/inconsistent
with the provisions of SG 2 Renewable Energy, Policy LDP 6 – Supporting the
Sustainable Growth of Renewables of the Argyll & Bute Local Development Plan, SPP
(2014) and the Onshore Wind Policy Statement in this respect.   
U. OPPORTUNITIES FOR ENERGY STORAGE (INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, Supplementary Guidance
2: Renewable Energy and SPP require applications for renewable energy developments to be
assessed against any opportunities for energy storage which exist.   
The proposal incorporates battery energy storage to store energy from the development or
excess electricity from the national grid, providing stability to the electricity supply network,
meeting energy demands and providing improved energy security. 
Having due regard to the above it is recommended that the Council should not object
to the proposal on the grounds of opportunities for energy storage (including
cumulative impacts) in accordance with the provisions of SG 2 Renewable Energy,
Policy LDP 6 – Supporting the Sustainable Growth of Renewables of the Argyll & Bute
Local Development Plan, SPP (2014) and the Onshore Wind Policy Statement.   
V. THE NEED FOR A ROBUST PLANNING OBLIGATION TO ENSURE THAT OPERATORS
ACHIEVE SITE RESTORATION (INCLUDING CUMULATIVE IMPACTS)

Page 44

Policy LDP 6 – Supporting the Sustainable Growth of Renewables, Supplementary Guidance
2: Renewable Energy and SPP require applications for renewable energy developments to be
assessed against the need for a robust planning obligation to ensure that operators achieve
site restoration. 
Following construction and commissioning, the proposal would be operational and generating
electricity for a period of approximately 35 years, after which it would be decommissioned and
removed, or alternatively, a further planning application could be made to extend the period of
operation. If a further application is not submitted, decommissioning would involve the total
removal of above-ground infrastructure. This would involve retention of existing access tracks
for forestry operations. Reinstatement of the site would be carried out in accordance with an
approved method statement. It is recommended that this matter is covered by planning
conditions or a legal agreement consistent with other projects across Argyll & Bute in the event
that the proposal obtains consent from the ECU.   
Having due regard to the above it is concluded that opportunities for a robust planning
obligation to ensure that operators achieve site restoration have been considered and
the proposal is therefore consistent with the provisions of SG 2 Renewable Energy,
Policy LDP 6 – Supporting the Sustainable Growth of Renewables of the Argyll & Bute
Local Development Plan, SPP (2014) and the Onshore Wind Policy Statement in this
respect.   
W. CLIMATE CHANGE (EMISSIONS REDUCTION TARGETS) (SCOTLAND) ACT 2019, THE
SCOTTISH ENERGY STRATEGY & ONSHORE WIND POLICY STATEMENT 2017 
The Climate Change (Emissions Reduction Targets) (Scotland) Act 2019 - The Scottish
Government is committed to increasing the supply of renewable energy within Scotland.  The
Climate Change (Emissions Reduction Targets) (Scotland) Act 2019 sets out stringent targets
for Scotland. The primary objective of the Act is to raise the ambition of the greenhouse gas
emissions reduction targets set out in the Climate Change (Scotland) Act 2009. The Act sets
a legally-binding “net-zero” target of all greenhouse gases by 2045. The “net-zero” target for
Scotland is five years ahead of the date set for the whole of the UK.   
The Scottish Energy Strategy (SES)  (2017)  and SES Position Statement (2021) – The SES
was published in December 2017 and sets out the Scottish Government’s strategy through to
2050, marking a ‘major transition’ over the next 3 decades in terms of energy management,
demand reduction and generation. The SES sets 2 new targets for the Scottish energy system
by 2030: The equivalent of 50% of the energy for Scotland’s heat, transport and electricity
consumption to be supplied from renewable sources; and, an increase by 30% in the
productivity of energy use across the Scottish economy. The SES recognises that reaching
the 50% target by 2030 ‘will be challenging’ but the target demonstrates ‘the SG’s commitment
to a low carbon energy system and to the continued growth of the renewable energy sector in
Scotland’. These energy and climate change goals mean that onshore wind must continue to
play a vital role in Scotland’s future – helping to decarbonise our electricity, heat and transport
systems, boosting our economy, and meeting local and national demand. The Statement goes
on to state that: ‘This means that Scotland will continue to need more onshore wind
development and capacity, in locations across our landscapes “where it can be
accommodated”’. The 2021 Position Statement states that: “The Scottish Government is
committed to supporting the increase of onshore wind in the right places to help meet the
target of Net Zero.” 
‘Onshore Wind Policy Statement’ (2017) – the onshore wind policy statement sets out the
Scottish Government’s position on onshore wind and supports the aims of the Scottish Energy
Strategy.  Paragraph 74 states that: “The Scottish Government believes that our ambitious

Page 45

renewable energy goals are very much in the interests of Scotland’s citizens and environment.
We also believe that developments can and must strike the right balance between utilising
Scotland's significant renewable energy resources whilst protecting our finest scenic
landscapes and natural heritage”. 
SPP, NPF3 and NPF4 
Despite now being seven years old, NPF3 and SPP are extant statements of Scottish
Government planning policy and will remain in place until such time as NPF4 is adopted. The
status of NPF3 and SPP has not changed and they are significant material considerations in
the determination of the present application. 
The SPP introduced a presumption in favour of development that contributes to sustainable
development. Paragraph 28 states: “The planning system should support economically,
environmentally and socially sustainable places by enabling development that balances the
costs and benefits of a proposal over the longer term. The aim is to achieve the right
development in the right place; it is not to allow development at any cost” 
Renewable energy generation targets are supported by NPF3 but that support is qualified as
mirrored in SPP. It is stated at paragraph 4.7: “The pressing challenge of climate change
means that our action on the environment must continue to evolve, strengthening our longer-
term resilience. A planned approach to development helps to strike the right balance between
safeguarding assets which are irreplaceable, and facilitating change in a sustainable way.”
Paragraph 4.4 of NPF 3 recognises that Scotland’s landscapes are spectacular, contributing
to our quality of life, national identity and visitor economy. Landscape quality is found across
Scotland and all landscapes support place-making. 
Having due regard to the above subject to the recommended advice and conditions it
is considered that the proposal is inconsistent with the provisions of: SPP, NPF3, the
Scottish Energy Strategy 2017 and Onshore Wind Policy Statement 2017, in this regard,
which represent the Scottish Governments most up to date position on this type of
development. 
X. CONCLUSION & RECOMMENDATION 
Both SPP and the Argyll & Bute Local Development Plan support renewable energy
developments provided it has been adequately demonstrated that there would be no
unacceptable significant adverse effects.   
The determining issues in relation to this case are: Landscape & Visual Impact (including
cumulative), and Aviation.  It is accepted that the proposal would make an important
contribution to the Scottish Government’s renewable energy targets and reduce greenhouse
gas emissions and these matters are important benefits which have been carefully considered. 
However, taking all of the above into account, overall it is considered that the unacceptable: 
Landscape & Visual Impact (including cumulative), and outstanding Aviation technical issues
would outweigh the benefits of the proposal.  Officers therefore conclude, for the reasons set
out above, that the proposed development does not accord overall with the relevant provisions
of the Scottish Planning Policy and the Argyll & Bute local development plan and that there
are no material considerations which would justify anything other than the Council objecting
to this proposal for the reasons detailed in this report. Should the objections raised by National
Air Traffic Services and Glasgow Prestwick Airport be withdrawn, then it is also recommended
that Argyll & Bute Council would no longer object on these grounds, and that the Energy
Consents Unit should treat these aspects of the Councils overall objection as withdrawn.