Argyll and Bute Council
Development & Economic Growth 
Committee Planning Application Report and Report of Handling in relation to The
Planning (Listed Building Consent and Conservation Area Consent
Procedure)(Scotland) Regulations 2015 
Reference No: 21/02738/LIB
Planning Hierarchy: Local
Applicant: Argyll Community Housing Association
Proposal: Demolition of five tenement blocks comprising 46 flats
Site Address:  Block A 19-9E John Street, Block C (1-5 Dalintober and 24-26 High
Street), John Street, Prince’s Street and High Street, Campbeltown    
DECISION ROUTE 
Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Listed Building Consent
 Substantial demolition of Dalintober Estate, a category B listed building 
(ii) Other specified operations
 n/a 
(B) RECOMMENDATION: 
Recommend that the Council determine to grant listed building consent subject to
the conditions and reasons attached, and accordingly notify the decision to Scottish
Ministers in light of objections from a statutory consultee. 
(C) CONSULTATIONS:   
Historic Environment Scotland (HES) (19.08.2022): 
Formally object to the proposed demolition and note that in the event that the Council
as planning authority is minded to grant consent, with or without conditions, then it
would be required to notify the decision to Scottish Ministers. 
HES object to the application because the applicant has not demonstrated that there
is no alternative to the full demolition of the category B listed Dalintober Housing
Estate. The current proposal is considered to represent a substantial loss to
Campbeltown’s heritage and all reasonable options to avoid this loss have not been
fully explored. 
ABC Design and Conservation Officer (30.08.2022):

Page 2

It is considered that the applicant has satisfactorily demonstrated that building is
incapable of meaningful repair or reuse for modern purposes. It is highlighted that
demolishing a listed building is a last resort when every other viable option has been
explored. The consideration of substantial or full demolition of a listed building is not
something that the planning authority would allow in many circumstances and it is
paramount in any application such as this that viable alternatives to demolition must
be sought. However in this particular case it is considered that the special interest of
this particular heritage asset lies in its massing as a whole group and as an example
of a scheme of planned interwar housing. Consent for demolition is considered to be
satisfactory in terms of the building being incapable of use for modern purposes
whilst retaining its special interest. 
(D) HISTORY:   
14/00581/LIB – Installation of replacement doors – Withdrawn 
15/03083/LIB - Installation of replacement doors – Approved – 16.12.2015 
15/03084/LIB – Installation of replacement door – Approved – 16.12.2015 
15/03085/LIB - Installation of replacement doors – Approved – 16.12.2015 
15/03086/LIB – Installation of replacement doors – Approved – 16.12.2015 
15/03087/LIB - Installation of replacement doors – Approved – 16.12.2015 
15/03088/LIB – Installation of replacement doors – Approved – 16.12.2015 
15/03089/LIB – Installation of replacement doors – Approved – 16.12.2015 
15/03110/LIB - Installation of replacement door – Approved – 22.12.2015 
21/02558/PPP – Site for Housing Development – Pending consideration 
(E) PUBLICITY:   
Oban Times / Edinburgh Gazette – Listed Building – Published 04.02.2022; Expired
25.02.2022 
(F) REPRESENTATIONS:   
(i) Representations received from: 
One letter of support has been received from Donald Cameron MSP dated 8th July
2022. 
Representations are published in full on the planning application file and are available
to view via the Public Access section of the Council’s website. 
(ii) Summary of issues raised:

Page 3

 It is stated that the properties at Dalintober were built in the 1930’s and
have now reached the end of their useful purpose; 
 It is stated that the configuration, layout and room sizes are not fit for
modern living, and are also of low energy efficiency; 
 It is stated that the demolition of the building would create a site for the
development of 18 modern new build homes that would meet the needs
of existing tenants and others on ACHA’s waiting list; 
 It is stated that the work required to bring the existing buildings up to
required standards would be three times greater than new build housing
costs; 
 It is stated that the current tenants as well as elected members of Argyll
and Bute Council are understood to support ACHA's proposals which are
considered to be a practical. Timely and cost effective solution to meet
the housing needs of the local community. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Statement: No  
(ii) An appropriate assessment under the
Conservation (Natural Habitats) Regulations
1994:   
No  
(iii) A design or design/access statement:    No  
(iv) A report on the impact of the proposed
development eg. Retail impact, transport
impact, noise impact, flood risk, drainage
impact etc:  
Yes 
Supporting information provided as follows: 
Submitted 24.12.2021: 
 Dalintober Design Competition Report Rev. A Oct. 2021 (ABC
Doc. Ref. 22591460)
 Options Appraisal Report Rev. D Nov. 2019 (ABC Doc. Ref.
22591463)
 Listed Building Demolition Statement Dec. 2021 (ABC Doc.
Ref. 22591464)
 Tenements at Dalintober – Conservation Architects Report
and Survey Interim Report March 2021 (ABC Doc. Ref.
22591465) 
Submitted 11.03.2022: 
 Feasibility study exploring flat reconfigurations and site
options. (5 items ABC Doc Ref.s 22637114 – 22637118)

Page 4

 Feasibility Cost Report (Rev. C – 101019) (ABC Doc. Ref.
22637387)
 Report exploring the option of retaining and selling the
properties (Ref 280319) 5th Oct. 2018 (ABC Doc Ref.
22637111) 
Submitted 16th May 2022: 
 Feasibility Cost Report Rev. B 13th May 2022 (ABC Doc. Ref.
22676634)
 Engineering Comment on Options (ABC Doc. Ref. 22676636)
 Response to HES Comments May 2022 (ABC Doc Ref.
22676639) 
Submitted 8th July 2022: 
 Plan for preliminary options appraisal for retention of Block E
(ABC Doc. Ref. 22718152) and Commentary (ABC Doc. Ref
22718154) 
Submitted 31.08.2022: 
 Response to HES Objection Letter (ABC Doc. Ref. 22753918) 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   N/a   
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  No    
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
‘Argyll and Bute Local Development Plan’ Adopted March 2015 
(delete as appropriate) 
LDP STRAT 1 – Sustainable Development 
LDP 3 – Supporting the Protection Conservation and Enhancement of our
Environment 
LDP 8 – Supporting the Strength of our Communities 
‘Supplementary Guidance to the Argyll and Bute Local Plan 2015’ (Adopted
March 2016 & December 2016) 
Historic Environment and Archaeology

Page 5

SG LDP ENV 16(b) – Demolition of Listed Buildings 
Sustainable Siting and Design 
SG LDP Sustainable – Sustainable Siting and Design Principles 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. (delete as appropriate) 
 Scottish Planning Policy
 Consultee Responses
 Managing Change Guidance for Demolition of Listed Buildings (April
2019)
 HES Green Recovery Statement April 2022
 Scottish Government’s Housing to 2040 (March 2021)
 Argyll and Bute Local Housing Strategy 2022-2027 
Argyll and Bute proposed Local Development Plan 2 (November 2019) – The
unchallenged policies and proposals within pLDP2 may be afforded significant material
weighting in the determination of planning applications at this time as the settled and
unopposed view of the Council. Elements of the pLDP2 which have been identified as
being subject to unresolved objections still require to be subject of Examination by a
Scottish Government appointed Reporter and cannot be afforded significant material
weighting at this time. The provisions of pLDP2 that may be afforded significant weighting
in the determination of this application are listed below: 
 n/a 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  No    
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  N/a 
(M) Has a sustainability check list been submitted:  No 
(N) Does the Council have an interest in the site:  No 
(O) Requirement for a hearing: No    
(P) Assessment and summary of determining issues and material considerations 
The application seeks listed building consent for the substantial demolition of a
category B listed building as a means to facilitate the redevelopment of the site by a
Registered Social Landlord to provide affordable housing.

Page 6

National policy and guidance is provided respectively in Scottish Planning Policy and
Historic Environment Scotland’s Managing Change Demolition publication. The latter
setting out a presumption against the demolition of listed buildings except where it
can be satisfactorily demonstrated that either i) the building no longer merits being
listed; and/or ii) that the building is incapable of meaningful repair; and/or iii) that the
demolition is essential to delivering significant benefits to economic growth or the
wider community. Policy LDP ENV 3 and SG LDP ENV 16(b) of the Argyll and Bute
Local Development Plan 2015 set out similar protection for the historic built
environment. 
The applicant has sought to demonstrate in their submission that the building is
incapable of meaningful repair or reuse in any manner that would both retain the
special characteristics of the building and provide a viable modern housing
development that meets the requirements of the applicant and the Campbeltown
community. 
Historic Environment Scotland (HES) have formally objected to the application and
raised concern that, in their opinion, the applicant has not exhausted consideration
of all viable options for re-use/partial retention of the building, and that in the absence
of the property being marketed it cannot be satisfactorily established that demolition
is acceptable as a means of last resort. HES also raise concern that demolition will
release embodied carbon within the existing building. 
The Council’s Design and Conservation Officer has however provided differing
consultation advice which considers that the supporting documentation provided by
the applicant is sufficient to demonstrate that the building is incapable of meaningful
repair or reuse for modern purposes. 
The proposed demolition of the heritage asset would facilitate the redevelopment of
the site for delivery of affordable housing and as such would seek to support stated
aspirations of both the Scottish Government and Council in this respect. 
(Q) Is the proposal consistent with the Development Plan: Yes   
(R) Reasons why Listed Building Consent Should be Granted: 
It is considered that, notwithstanding the concerns raised by Historic Environment
Scotland in their objection, it is the consideration of officers that the applicant has
satisfactorily demonstrated that the category B listed building is incapable of
meaningful repair or reuse for modern purposes without loss of the key attributes of
its distinctive massing and external architectural form that provides its special
interest. Furthermore, it is recognised that the demolition of the building would
facilitate the redevelopment of the site for affordable housing that would be tailored
to meet the housing demand of the local community and would contribute toward
local and national targets for delivery of new affordable housing. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
N/a

Page 7

(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
Requirement under the Planning (Listed Buildings and Conservation
Areas)(Notification of Applications) Direction 2015 to notify Scottish Ministers in the
event that the Council were minded to grant listed building consent contrary to the
advice of Historic Environment Scotland.   
Author of Report: Peter Bain Date: 11.09.2022 
Reviewing Officer: Sandra Davies Date: 13.09.2022 
Fergus Murray
Head of Development & Economic Growth

Page 8

CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 21/02738/LIB 
1. LIB - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 24.12.2022, supporting information and, the approved drawings
listed in the table below. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan 20351-ECD-XX-
XX-DR-A-07001
PO2 14.09.2022
Site Plan 200351-ECD-XX-
XX-DR-A-05100
PO2 14.03.2022
Plans and
Elevations as
Existing
200351-ECD-XX-
XX-DR-A-05101
PO2 14.09.2022 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
Note to Applicant: 
 This consent will last only for three years from the date of this decision notice,
unless the development has been started within that period [See section 16 of the
Planning (Listed Building and Conservation Areas) (Scotland) Act 1997 (as
amended).]  
2. No Demolition Until A Contract Has Been Let For Redevelopment 
No demolition works shall commence until satisfactory evidence has been submitted
to the Planning Authority to show that a contract has been let for the redevelopment
of the whole site in accordance with proposals for which detailed planning
permission/approval of matters specified in conditions has been obtained. 
Reason: In order to protect the amenity of the locale and the built environment by
preventing the premature demolition of the property concerned, and in order to
underpin the justification for development of the building as being essential to
delivering significant benefits to the wider community. 
Note to Applicant: 
 Under the terms of the Planning (Listed Buildings and Conservation Areas)
(Scotland) Act 1997, section 7(2)(b)(c), applicants receiving consent for works
of demolition to a listed building/unlisted building in a conservation area must:
notify RCAHMS of their intention to carry out the work; thereafter allow
RCAHMS reasonable access to record the building for at least 3 months
following the granting of consent and the giving of notice to the Commission,
during which time demolition may not be undertaken unless RCAHMS has
indicated in writing that its record has been completed or that they do not wish
to record it.  The RCAHMS contact details are as follows: 
The Royal Commission on Ancient Historical Monuments (RCAHMS), 
Threatened Buildings Survey, 
John Sinclair House,

Page 9

16 Bernard Terrace, 
Edinburgh, EH8 9NX.  
Tel. 0131 651 6773 
3. Demolition Method Statement 
No demolition works shall commence until a Demolition Method Statement has been
submitted to and approved in writing by the Planning Authority. The Demolition Method
Statement shall address the developer’s intentions in respect of: 
 Demolition Methodology - Type and sequence of demolition and site
establishment;
 Disposal of Waste Materials – details of the intended means of disposing of all
materials arising from the demolition including any special arrangements required
for the potential removal and disposal of hazardous materials; 
 Notification of demolition to adjacent property owners and local residents;
 Dust & Noise Reduction Strategy - steps to be taken to minimise the risk and
nuisance to adjoining land, building or road users;
 Proximity to Buildings, Other Structures, Roads and Accesses – measures to
protect structural integrity, to ensure exposed gables remain weather tight and
protection of means of access;
 Traffic Management – to protect safety of pedestrians and vehicular traffic. 
The development shall be implemented in accordance with the approved Demolition
Method Statement, unless otherwise approved in writing by the Planning Authority. 
Reason: In the interest of public safety and in order to protect the amenity of the
locale and the built environment. 
Note to Applicant: 
In devising the Demolition Method Statement consultation should take place with the
Council’s Building Standards Officers, Environmental Health Officers and the Roads
Authority to ensure compliance with other statutory requirements.  
4. Reclamation of Materials 
No demolition works shall commence until a schedule of items to be reclaimed from
the site during or prior to demolition has been drawn up in consultation with, and
approved in writing by the Planning Authority. These materials and items shall be
satisfactorily set aside, stored and/or used in a manner which shall first be agreed with
by the Planning Authority, prior to any demolition taking place. 
Reason: In order to protect and save materials and items which can reasonably be
retrieved, in the interests of the historical and architectural qualities of the building to
be demolished. 
Note to Applicant: 
Consultation with the Council’s Design & Conservation Officer should be undertaken
in identifying items to be reclaimed.

Page 10

APPENDIX A – RELATIVE TO APPLICATION NUMBER: 21/02738/LIB 
LAND USE PLANNING AND POLICY ASSESSMENT 
A. Policy Context: 
This application seeks listed building consent for the demolition of a group of category
B listed buildings collectively referred to as Dalintober Housing Estate and comprising
46 flats (Block A 19-9E John Street), Block B, (21-33 John Street), Block C (1-5
Dalintober), and Block E (17-21 Dalintober and 24-26 High Street). 
Policy Background: 
Scottish Planning Policy 2020 sets under s137 that the planning system should: 
 Promote the care and protection of the designated and non-designated historic
environment (including individual assets, related settings and the wider cultural
landscape) and its contribution to sense of plane, cultural identity, social well-
being, economic growth, civic participation and life-long learning; and 
 Enable positive change in the historic environment which is informed by a clear
understanding of the importance of the heritage assets affected and ensure
their future use. Change should be sensitively managed to avoid or minimise
adverse impacts on the fabric and setting of the asset, and ensure that its
special characteristics are protected, conserved or enhanced. 
S141 expands on this and advises that: 
 Change to a listed building should be managed to protect its special interest
while enabling it to remain in active use. Where planning permission and listed
building consent are sought for development to, or affecting a listed building,
special regard must be given to the importance of preserving and enhancing
the building, its setting and any features of special architectural or historic
interest. The layout, design, materials, scale, siting and use of any development
which will affect a listed building or its setting should be appropriate to the
character and appearance of the building and setting. Listed buildings should
be protected from demolition or other work that would adversely affect its
setting. 
Historic Environment Scotland’s ‘Managing Change Guidance for Demolition’ (April
2019) is a national statement setting out guidance which includes a number of tests to
be applied when considering demolition. In particular it is highlighted that demolition
should only be considered if it can be demonstrated that: 
 The building is no longer of special architectural or historic interest; or
 It is incapable of meaningful repair; or
 Demolition is essential to delivering significant economic or wider community
benefits. 
If none of the above apply then demolition should only be considered if it can be
demonstrated that retention is not economically viable. This should include open and

Page 11

transparent marketing of the building to demonstrate that every effort has been made
to secure a buyer who would retain the building. 
HES have also highlighted their Green Recovery Statement April 2022 as a material
consideration in the determination of this application. The statement seeks to set out
that “the historic environment can make a vital contribution to Scotland’s green
recovery from the pandemic and its transition to net zero and a climate resistant
society”. 
The objection from HES highlights “that the reuse and adaption of Scotland’s existing
historic buildings is integral to a net zero transition”, and identifies that “the demolition
of buildings releases the embodied carbon within them. A well maintained and
retrofitted traditional building will emit less carbon by 2050 than if it was demolished
and replaced by a new building. Retrofit uses less material (mitigating resource scarcity
and damaging extraction) and generates less waste in comparison to demolition”. 
Policy LDP 3 of the Argyll and Bute Local Development Plan 2015 sets out a
presumption against development that does not protect, conserve or where possible
enhance the established character of the built environment in terms of its location,
scale, form and design, and/or where development will have adverse effects on the
integrity or special quality of nationally designated built environment sites. 
Supplementary Guidance to the LDP provides more specific detail on the approach to
demolition of listed buildings. SG LDP ENV 16(b) sets out that proposals for total or
substantial demolition of a listed building will only be supported where it is
demonstrated beyond reasonable doubt that every effort has been exerted by all
concerned to find practical ways of keeping it. This will be demonstrated by evidence
that the building: 
1. Has been marketed at a reasonable price for a period reflecting its location,
condition, redevelopment costs, and possible viable uses without finding a
purchaser; and 
2. Is beyond economic repair and incapable of re-use for modern purposes
through submission and verification of a thorough structural condition report
prepared by a conservation accredited professional and a detailed verifiable
breakdown of costs in line with guidance provided in the Managing Change
Guidance Note on Demolition. 
SG LDP ENV 16(b) also identifies that in exceptional circumstances retention of a
building may prevent wider public benefits that may derive from the redevelopment of
that site. Justification for demolition in the interest of wider public benefit may be
considered in those instances. This justification would only be considered if the
proposed redevelopment was of regional or national significance and that clear
evidence shows that every effort was made to incorporate the listed building into the
new development. 
In circumstances where demolition is to be approved SG LDP ENV 16(b) sets out that
the planning authority must also approve detailed proposals for the restoration and
reuse of the site, including any replacement building or other structures, and may
require that a contract be let for redevelopment in advance of demolition in appropriate
cases. Appropriate provision is also required by conditions in relation to recording of
buildings prior to demolition, confirming the methods of demolition to be employed, and
conservation/retention of architectural or other features/materials.

Page 12

B. Location, Nature and Special Interest of the Buildings 
This application seeks listed building consent for the demolition of a group of category
B listed buildings collectively referred to as Dalintober Housing Estate and comprising
46 flats (Block A 19-9E John Street), Block B, (21-33 John Street), Block C (1-5
Dalintober), Block E (17-21 Dalintober and 24-26 High Street), and Block F (20-22 High
Street). 
The application site is a residential development located within the settlement of
Campbeltown occupying a substantial site located between High Street, Prince’s
Street and John Street/Kinloch Park. 
The 2 and 3 storey Scots Baronial style development at Dalintober is considered by
Historic Environment Scotland to be a distinctive example of planned, interwar council
housing estate that was built in 1939. The buildings are a product of the 1930’s Housing
Acts which placed an emphasis on the provision of generous space standards, larger
family homes and higher densities. 
The form and massing of the buildings is expressed by symmetrically composed blocks
with steep pitched roofs, crow stepped gables ad curved bow windows. This bold form
makes a strong streetscape contribution to High Street, Prince’s Street and John
Street. 
The statutory listing item LB43081 covers seven distinct tenement blocks that are
covered under a single listing. The current application seeks to demolish the five
tenement blocks within the ownership of the applicant, Argyll Community Housing
Association. For the avoidance of doubt the tenement block on the opposite side of
Prince’s Street (comprising 3 Queen Street, 18-20 Prince’s Street, and 28-30 High
Street), and also Block F (20-22 High Street) are not included within the current
application for demolition. The application therefore relates to a substantial as opposed
to complete demolition of a group of buildings covered by a single listing. It is further
noted for clarity that Block F was originally identified in the original submission but
subsequently excluded following submission of updated plans on 14th March 2022. 
The statutory listing published by Historic Environment Scotland sets out the following
description and statement of special interest: 
19-33 (ODD NOS) JOHN STREET, 1-21 (ODD NOS) PRINCE’S STREET, 18 AND 20
(EVEN NOS) PRINCE’S STREET, 3 QUEEN STREET AND 20-30 (EVEN NOS) HIGH
STREET DALINTOBER, WITH BOUNDARY WALLS AND GATEPIERS
LB43081 
Summary
Category B
Date Added: 28/03/1996
Supplementary Information Updated: 23/04/2018
Local Authority: Argyll And Bute
Planning Authority: Argyll And Bute
Burgh: Campbeltown
NGR NR 72017 20891 Coordinates 172017, 620891 
Description
Henry Edward Clifford, 1939. Planned development of 3-storey Scots Baronial
tenements, with elevations composed symmetrically to streets. Stugged squared and

Page 13

snecked sandstone battered base course to cill height, harled walls above, some
elevations with strip of pebble-dash block-finish to ground floor windows and to
dormers. Moulded eaves course to principal elevations, square profile to sides and
rear. Margins and projecting concrete cills to windows. 
19 JOHN STREET: 3-storey, 6-bay symmetrical south elevation, 3-storey bows
flanking centre 2 bays, 3-light at ground and 1st floor, tripartite windows at 2nd floor,
bipartite windows at bays to outer left and right. 
21-33 JOHN STREET: 14-bay south elevation comprising 2-storey and attic 6-bay
centre block with flanking single storey and attic 4-bay wings. Two windows at ground
floor and tripartite windows at 1st floor of bays flanking centre. Gabled dormers
breaking eaves at 2nd floor. Advanced and gabled bays flanking, two windows closely
spaced at ground floor, tripartite windows at 1st floor and bipartite windows at 2nd floor.
4-bay wings flanking comprising advanced and gabled outer bays with tripartite
windows at ground and 1st floors, 3-bay links with gabled dormers breaking eaves at
centre bay and flanking catslide dormers. 
1-5 PRINCE’S STREET: tenement on corner site comprising 2-storey and attic corner
block with 4-bay elevations to John Street and Prince’s Street, symmetrical to corner,
and 2-storey 4-bay asymmetrical wing extending to north along Prince’s Street. Gabled
corner bay with two windows at ground floor, bipartite windows at 1st and 2nd floor,
2nd floor window corniced with panelled apron, datestone in gablehead. 2-bay flanking
elevations with gabled dormers breaking eaves at 2nd floor, gabled wings flanking with
bipartite windows at ground floor, and tripartite windows at 1st and 2nd floors. 3-bay
wing projecting to right of Prince’s Street elevation, gabled wing at outer right with
tripartite window at ground floor, bipartite window at 2nd floor. 
7-15 PRINCE’S STREET: 14-bay east elevation comprising 6-bay 3-storey centre
block (matching 19 John Street), flanking 2-storey 4-bay wings, gabled bays at outer
left and right with tripartite windows at ground floor and bipartite windows at 2nd floor. 
17-21 PRINCE’S STREET AND 24 AND 26 HIGH STREET: mirror image of 1-5
Prince’s Street, except for additional wing to High Street matching that on Prince’s
Street. 
3 QUEEN STREET, 18 AND 20 PRINCE’S STREET AND 28 AND 30 HIGH STREET:
mirror image of 17 - 21 Prince’s Street. 
20 and 22 HIGH STREET: 2-storey, 3-bay north elevation. Advanced and crowstepped
gable to left with a tripartite window at ground and 1st floor. Dormer windows breaking
eaves, central dormer with gablehead. 
REAR ELEVATIONS: harled elevations over brick base course, regularly fenestrated
with openings of various sizes. Modern tilting plate glass timber windows, some original
timber doors surviving, 3-panel flush-beaded entrance doors with 9-pane uppers, and
vertically-boarded timber doors to stores. Grey slate piended roof with cast-iron gutters
and downpipes, pedimented dormerheads with thistle finials. Harled stacks with deep
battered copes and tall black battered circular cans. Harled crowsteps at gables and
blind concrete margined slit windows in gableheads. 
BOUNDARY WALLS AND GATEPIERS: random rubble battered dwarf walls fronting
street elevations, rubble saddleback cope with raised copestones giving crenellated
effect. Tapered drum gatepiers, coped with domed caps.

Page 14

Statement of Special Interest 
The Dictionary of Scottish Architects notes that Clifford died in 1932, so it has been
assumed that the buildings were executed posthumously. 
Minor updates to listed building record in 2018. 
C. Is the Building No Longer of Special Interest? 
Managing Change guidance identifies that “in some circumstances a listed building
may no longer be of special architectural or historic interest. This might include when
there has been a significant loss of fabric or features of interest, or where there have
been later alterations that have affected the character of the building”. 
It is observed that whilst the building has been the subject of repair and minor alteration
to its fabric over time, most recently through replacement of doors and windows, the
key architectural features and form, it’s scale, massing and contribution to townscape
remain intact. 
The supporting information provided by the applicant includes information that casts
doubt on the Special Interest attribution historical interest of the building design to
Henry Clifford and indicates that the building design appears more likely to be the work
of less celebrated architects James Thomson & Sons. 
HES have acknowledged that the attribution to Clifford was based on information held
at the time of listing and that their records will be updated to reflect the applicant’s
research. They have however also stated that the new attribution does not in their view
undermine the purpose of the listing as it is the distinctive massing and external
architectural form that creates the buildings significant character and special interest. 
Whilst the applicant has sought to contend that the Special Interest of the building is
diminished by the lack of certainty over its attribution to Clifford, officers consider that
the relatively intact and little altered state of the buildings would suggest that it
continues to merit its listed status. 
D. Is the Building Incapable of Viable Repair? 
Managing Change guidance identifies that “in some instances the repair and reuse of
a building is not economically viable. This means that the cost of retaining the listed
building would be higher than its end value. Where the cost of works is higher than the
end value, the difference is referred to as the ‘conservation deficit’”. 
“The principle of demolition should only be accepted where it has been demonstrated
that all reasonable efforts have been made to retain the listed building. The efforts
should take into consideration the special interest of the building”. The guidance also
identifies that “this includes undertaking proactive marketing measures”. 
The requirement to consider whether the building is beyond economic repair and
incapable of modern use, and marketing of the buildings is also required by the
provisions of policy LDP 3 and SG LDP ENV 16(b) of the Argyll and Bute Local
Development Plan. 
The applicant has through their supporting submissions sought to demonstrate that
they have engaged with HES and Argyll and Bute Council since October 2018 as part
of their approach to exploring alternatives to demolition. During this time period ACHA

Page 15

has employed a range of professionals including conservation architects, market and
property specialists, architects and structural engineers to review the options and
prepare feasibility studies on the viability of retaining the buildings. This included the
submission of the ‘Dalintober Estate Options Appraisal’ report (Nov. 2019) which
considered the following options: 
A – Refurbishment of the Buildings
B – Partial Demolition and Façade Retention
C – Mothballing of the Site
D – Sale of ACHA’s interest in the Site
E – Demolition of the Buildings to Facilitate Redevelopment 
The options appraisal concluded that option E was the only viable option for ACHA in
terms of meeting housing needs of its tenants. 
Following review of the initial submission concern was raised by HES that the applicant
had not satisfactorily considered all potential options for viability. In response a further
options appraisal was submitted in May 2022 that included: 
1. Retention and conversion of Block E to terraced houses; 
2. Façade retention for Block E to build terraced houses behind, and 
3. Façade retention for Block E to build terraced houses (alternative proposal). 
The May 2022 options appraisal concluded that from both a design and cost
perspective these proposals were not a viable option for ACHA. The achievable layouts
would have some difficulty in complying with Building Standards Regulations, would
provide limited private gardens, and were not suitable ‘family’ properties, and would
compromise the applicant’s vision to deliver a net zero homes for life’ development. 
Condition of the Building: 
The options appraisal identified that the external fabric of the building was consistent
with a typical building of its age (80+ years) which had not benefitted from any major
investment. Externally the building is finished in roughcast which is past its expected
design life of 40-60 years and showing signs of deterioration through cracks and areas
of bossed render. The roof covering of slate is original; a traditional slate roof would be
expected to have a design life of around 120 years, however the report did flag up
concerns relating to the lead flashings which are showing signs of failure and
evidenced by water penetration at the chimneys and roof valleys. It is noted that a
building within the listing but outwith ACHAs ownership has required a replacement
roof and extensive chimney downtakings to combat issues of water ingress. Windows
and doors have recently been replaced and in reasonable condition. External areas
consist primarily of grass and tarmac which are also maintained in a reasonable
condition. 
Refurbishment of the Buildings: 
(2019 Options Appraisal Report) Option A identified that issues relating to dampness
would require to be addressed through replacement roof coverings, flashings and
roughcast. Internal works would be required to 12 flats to provide adequate sized
modern bathrooms requiring structural alteration and replacement of kitchen and
bathroom fittings. Ground floor flats would also require alteration to door frames and
provision of access ramps to address accessibility requirements. Door entry systems
would require to be installed in common closes and likely to require external additions
to accommodate appropriate door widths. The removal of existing internal cavity

Page 16

insulation and installation of external wall insulation, upgrading of windows,
boilers/heating and installation of solar panels were all recommended to meet current
energy efficiency standards. Reconfiguration of  the building (inclusive of Block F which
has subsequently been removed) would reduce the number of existing units from 46
to 28, and would comprise of 8 four-bed houses, 10 maisonettes, 4 three-bed flats, and
6 two bed-flats. It was identified that the proposed housing mix and lack of private
garden space did not meet the needs of applicants currently on ACHA’s waiting list
and as such could not justify the estimated outlay of £2.4m to undertake refurbishment
works. 
Refurbishment also considered an alternative proposal to convert 6 flats within Block
E into a new area office for ACHA. A number of floor layouts were considered and
rejected on the basis that they did not meet ACHA’s requirements for open plan office
space and it was considered that refurbishment would cost more than a new build
office of the same size. 
(Feasibility Cost Report May 2022) Option 1 considered the option to retain Block E for
conversion through internal alteration and refurbishment to create 2 and 3 storey
terraced housing. Whilst this option would have the significant benefit of retaining the
external appearance of a significant corner block the design of housing provided would
be compromised through use of internal wall insulation, technical issues with entrances
and stair cases, lack of garden space for the corner unit, and an additional cost of
£120k per unit over and above ACHA’s typical new build costs which would leave a
shortfall in funding of £972k for the conversion works. This option was not considered
to be viable by ACHA. 
Partial Demolition and Façade Retention: 
(2019 Options Appraisal Report) Option B looked at the partial clearance of the site
and redevelopment to provide houses tailored to the housing demand and current
standards. The 2019 report looked at the demolition of Blocks D, E (&F which has
subsequently been removed from the application) and façade retention of Blocks A, B
and C to create 10 four bedroom houses with facades retained on the frontage onto
John Street/Kinloch Park. This option was not considered in detail as the demand for
four-bed houses is low and unlikely to be cost effective. 
(Feasibility Cost Report May 2022) Options 2 and 3 looked at different options for
façade retention of Block E and provision of new development behind. Whilst these
options would have had the significant benefit of preserving the streetscape and
massing of the High Street/Prince’s Street corner neither was identified to be capable
of delivering new housing that met the requirements of ACHA’s current waiting list, or
which was considered to be cost effective. Option 2 looked at the provision of 7 new
build houses behind the retained corner façade, however it was not possible to deliver
a design that met ACHA’s requirements on housing mix or accessibility, and it was also
identified that compromises in design to accommodate the retained façade would give
rise to issues on daylight afforded during winter months and inclusion of roof terraces
that were no family friendly features. This option was costed at £230k above ACHA’s
typical new build cost per unit with a projected funding shortfall of £1.6m. Option 3
looked at a new build housing mix better attuned to demand as identified in the Housing
Need and Demand Assessment. The design was again however compromised by the
requirement to work around the retained façade and was considered unlikely to comply
with Building Regulations and Housing Standards. The additional cost per unit over
normal ACHA build costs was identified as £244k per unit with an overall funding
shortfall of £1.7m.

Page 17

Mothballing of the Site: 
(2019 Options Appraisal Report) Option C identifies that mothballing would involve the
relocation of existing tenants and then only providing basic maintenance of the
properties. Public consultation by ACHA identified strong opposition to this option with
concerns raised about the security of empty properties, and the appearance of boarded
up windows being a blight on the locality. Whilst this option would avoid demolition of
the building and would solve immediate issues it would only offset the requirement to
provide a long term solution and would only be desirable if it were desirable to pursue
on of the alternative options and it was reasonably expected that a future change in
circumstances would be likely to improve the prospects for that being deliverable. 
Sale of the Site: 
(2019 Options Appraisal Report) Option D of the report notes that ACHA have already
extensively marketed the properties for rent with little success. The appraisal considers
both sale of the whole estate and piecemeal disposal. The appraisal notes that any
prospective purchaser would be likely to face similar issues to ACHA in relation to the
requirement for significant investment to bring the properties up to liveable standard
but no guarantee that demand in the local market would support the investment.
Further supporting information submitted in July 2022 advises that sale of the site was
also identified to be impeded and the applicant has advised that the Scottish Housing
Regulator expressly forbids Registered Social Landlords from offering a tenanted
property for sale. A tenant ballot would require to be undertaken to allow any transfer
(sale) of a tenanted property and this could only be to another Registered Social
Landlord. The three other Registered Social Landlords in Argyll and Bute have declined
any interest in the Dalintober Estate. 
The applicant has also appointed DVS Property Specialists to review market conditions
and economic viability. Their report identified that there is a lack of demand for flats in
the locality which would likely require lengthy marketing periods to achieve sales
observing that many other flats in Campbeltown remain unsold despite extensive
marketing periods and indicates a likely lack of interest from private investors in a
property of this type. The report also identifies that the properties within the Dalintober
Estate are not perceived to be desirable within the wider community. 
Summary: 
The applicant has set out the position that they believe that the alternatives to
substantial demolition have been fully explored and are comprehensively presented in
the supporting reports. 
HES acknowledge in their consultation response that “the current layout of the
buildings, and their energy efficiency, does not meet the needs of the applicant or the
wider community”. They also note their understanding “that constraints on funding
streams available to the applicant to repurpose the buildings limits the applicant’s
viable options”, and acknowledge that “additional work has been undertaken by the
applicant to consider a range of adaption/façade retention options”. 
HES have however also stated that they do not consider “that all options short of
complete demolition of the estate have been adequately explored”. The response
identifies that further options including the reconfiguration of internal layouts and rear
elevations, the introduction of private front and rear entry doors, improvements to close
entrances, enhancement of the buildings thermal performance, action to address

Page 18

dampness, and conversion of flats to terraced houses could all be included in the
potential options. HES have also identified that they “are open to options that include
retention of a key block, or number of blocks, that best express Dalintober’s form,
massing and architectural style while demolishing other buildings to provide scope for
new development. The retained block/s could then be repurposed either by the
applicant or marketed with an agreed design brief”. HES also note the applicant’s
stated position on the marketing of the property but comment that they consider “it
should be possible to market the properties if the remaining tenants have been
rehoused or to market part of the estate that is untenanted”.  HES also state that
“undertaking a targeted marketing exercise with an agreed design brief setting out the
scope for intervention and potential for partial, selective demolition would establish if
there were buyers who could retain the listed buildings” noting that this could include
commercial uses as part of a mixed use development. 
The Council’s Design and Conservation Officer has commented that ACHA’s claim that
they would be unable to sell the building to any other party than anther RSL does not
appear to be wholly correct as guidance on the Scottish Housing Regulator website
relating to the disposal of land by an RSL includes discussion on disposal to a person
or body other than an RSL although it is acknowledged that such matters are subject
to regulation that seeks to protect the rights of existing tenants and requires their
consultation in such matters. 
The Council’s Design and Conservation Officer further comments that they do consider
that the applicant has undertaken appropriate analysis as to whether the building is
capable of meaningful repair as per the requirements of national HES Managing
Change guidance on demolition. It is observed that the local provisions of LDP ENV 3
and SG LDP ENV 16(b) of the LDP do not unfortunately dovetail with the HES guidance
but is nonetheless a material consideration that must also be considered. The LDP
policy asks whether the building is beyond economic repair and incapable of reuse for
modern purposes thereby amalgamating the two points which HES consider
separately. The latter part of the LDP clause alludes to meaningful repair, and as
per the HEs guidance, does not then lead to a requirement for marketing of the
building where it is established that the building is incapable of meaningful
repair. The Council’s Design and Conservation Officer further advises that this is a
unique case and as such would not set a precedent for demolition without marketing. 
E. Is the Building Incapable of Meaningful Repair? 
Managing Change guidance identifies that “most traditionally-built buildings, even
those in an advanced state of decay, can be repaired. There are occasions when
repairing and reusing a listed building would lead to extensive loss or replacement of
fabric, which would have a consequent effect on its special interest. If repairing a
building cannot preserve its special interest, it is not capable of meaningful repair”. It
is further clarified that “this issue separate to that of economic viability of any repairs”. 
HES have identified in their consultation response that it is the “distinctive massing and
external architectural form that creates the buildings’ significant character and special
interest”. 
The Council’s Design and Conservation Officer has commented that, in their view, the
applicant has demonstrated that the 1930’s layouts cannot be retained in a manner
that meets current requirements for energy efficiency and modern living space, no
matter the level of retention of the exterior. It is further observed that, whilst the crow-
stepped gables and curved bow windows add interest, that these do not amount to
such significant interest without the overall massing of the buildings to make façade

Page 19

retention of one or more block sufficient to retain the current special interest of the
overall Dalintober Estate. It is on this basis that officers consider that the applicant
has sufficiently demonstrated that the building is incapable of meaningful repair
or re-use for modern purposes. 
F. Is the Demolition of the Building Essential to Delivering Significant Benefits to
Economic Growth of the Wider Community? 
Managing Change guidance identifies that “some projects may be of such economic
or public significance that their benefits may be seen to outweigh the strong
presumption in favour of retaining a listed building.” It is further discussed that “if the
proposals involve a new development on the site, planning permission for the
replacement development should be demonstrated as being in line with local and
national policy. Unless this can be done, there is no certainty that planning permission
will be achievable. This would make it impossible to ensure that the benefits were going
to happen, and the demolition would therefore not be justified”. 
SG LDP ENV 16(b) similarly offers qualified support for demolition that would facilitate
a redevelopment of a site demonstrated to be merited for wider public benefit of
regional or national significance where it has been demonstrated that the listed building
cannot be meaningfully incorporated into the new development, or that every effort to
place the new development in an alternative location was made. 
The applicant has confirmed that they currently have no alternative sites within
Campbeltown on which they are able to deliver a housing scheme of the scale required. 
The applicant has also advanced the argument that the listed building cannot viably be
incorporated into a re-development of the site for social housing in a manner which
would both satisfactorily address the local requirements for housing or other regulatory
requirements, and result in any meaningful retention of the building which enhances or
preserves the qualities which are attributed to its special interest. 
The importance and requirement to deliver affordable housing is a national objective
and underlined by the Scottish Government’s vision statement ‘Housing to 2040’ which
seeks to deliver 100,000 affordable homes by 2032 as part of a 20 year vision for
housing. This includes an aspiration for all new homes delivered by RSLs to be zero
emissions by 2026, and supporting housing development in rural and island areas
helping to prevent depopulation and enabling communities to thrive. 
The Council’s Local Housing Strategy 2022-2027 identifies that 11% of housing stock
in Kintyre is ineffective and that further development would support regeneration and
positive economic growth. It identifies that “the focus in Kintyre remains on repairing,
maintaining and managing existing stock but that there is scope for some judicious
new build developments in line with repopulation and growth agendas for the area.
Tackling fuel poverty and improving energy efficiency remains priorities.” 
Whilst the applicant has stated their intent to redevelop the site to provide affordable
housing that meets local demand and it is the consideration of officers that the
applicant’s intent to redevelop the site can be aligned with matters that are
arguably of regional and national interest in relation to meeting targets for
delivery of affordable housing. 
Demolition and Redevelopment: 
(2019 Options Appraisal Report) Option E only puts forward a summary case for
demolition, clearance of the site and its redevelopment with housing tailored to meet

Page 20

housing demand. The original submission is however also accompanied by a
supporting information that sets out detail of a design competition run with the RIAS to
identify an architect to take forward a zero-carbon design approach to redevelopment
of the site, and the public consultation undertaken as part of this process. The report
identifies that 12 entries were received that were initially scored by ACHA and the RIAS
with an 80% Quality Score and a 20% Price Score; four finalists proceeded to an
interview stage with the judging panel which also included community representation
and a public consultation. 
The applicant has not however as yet produced a detailed design solution for the
redevelopment of the site although an application for planning permission in principle
(ref. 21/02558/PPP) has been submitted for consideration of the Council. The Design
Statement for that application identifies that a pre-demolition audit would be
undertaken with the aim of re-using as many of the existing building components as
possible in order to both lower loss of embodied carbon through demolition but also to
save elements of the building design and reuse these within the redevelopment. Whilst
the project architects have initiated discussions with officers to further explore their
ideas for a design solution these remain at concept stage and have not been submitted
for consideration at this time. It has also been communicated that the applicant requires
to obtain certainty on their ability to demolish the existing buildings before they are able
to commit to the significant investment required to flesh out a detailed design for the
redevelopment of the site and as such is unable to do this until both listed building
consent for demolition and planning permission in principle for the redevelopment of
the site have been attained. The applicant has also identified that maintaining the
status quo is also not a viable solution as the vacant properties within the Dalintober
Estate cost approx.. £200k to retain the properties when void rent loss is considered.
This presents a ‘Catch-22’ position as both the Managing Change guidance and SG
LDP ENV 16(b) of the LDP set out an expectation that the applicant can demonstrate
their ability to deliver a high quality redevelopment of the site and the benefits that this
will entail as part of the justification for the demolition of a listed building. In this instance
it is however recognised that the applicant has engaged with both the Council and HES
over a period of four years with a view to addressing a longstanding issue of vacant
property within the Dalintober Estate and use of the site to address current demand in
the locality for affordable housing. Whilst it would not be appropriate for the Council to
seek to determine the related application for planning permission in principle ahead of
the issue on demolition being definitively resolved it is however possible to identify that,
aside from historic environment constraints, no other fundamental barrier to the
redevelopment of the site for housing development has been identified to date and as
such the key issue in this respect, would be to identify the extent to which the principle
of demolition can be accepted and how this should influence the definition of conditions
setting out the parameters for the siting, design, and finishes for the redevelopment,
and extent to which this should incorporate elements of the existing
buildings/materials/architectural detailing. 
The Council’s Design and Conservation Officer has noted that in seeking detailed
planning approval, the applicant will require to demonstrate a detailed site and
contextual analysis considering the historical assets within the setting of this site, as
well as giving consideration to the existing building and how any elements should be
replicated or acknowledged in some regard. HES’s guidance on New Design in Historic
Settings provides relevant guidance and notes that “a modern building which
disregards its setting is very likely to be regarded as unsuccessful both now and in the
future” and that “new design should consider and respond to those layers of history –
the narrative of the place. Analysis of historical maps along with archive material and
published sources are very useful analytical tools to understand the historical
development of a place”. In the context of the Dalintober Estate it is highlighted that

Page 21

Block E forms a strong corner element that is currently mirrored to the east by a block
that will not be demolished; the treatment of this corner is critical to retain a sensitive
relationship to the remaining streetscape. Additionally as the crow-stepped gables and
curved windows form part of the special architectural interest then consideration could
be given to incorporation of similar detailing in the new scheme. 
This is again a relatively unique position where there is general support in principle
within the LDP for the use of the site for affordable housing as per the intent of the
applicant but where the actual design solution and the extent to which this might
reutilise elements of the existing building or reflect its scale/massing/architectural
features remains unspecified. 
In the absence of a detailed design solution for the site it is considered that it would be
appropriate to underpin any acceptance of the principle of demolition to ensure that no
demolition works can commence until such time as detailed planning permission for
the redevelopment of the site for affordable housing is in place, and that a contract has
been let for the implementation of the approved redevelopment scheme. 
It is considered that the use of appropriately worded suspensive conditions
would ensure compliance with Managing Change and SG LDP ENV 16(b) in this
particular respect. 
G. Carbon / Net Zero 
HES have expressed concern in their consultation response that the demolition of the
building would give rise to the release of embodied carbon and generation of waste,
and highlights that an appropriate scheme for the re-use and adaption of historic
buildings might be expected to emit less carbon by 2050 when compared to demolition
and replacement by a new building. 
The Council’s Design and Conservation Officer in their response notes the importance
of embodied energy being given due consideration in any application but advises that
in the case the applicant has demonstrated that the only feasible option in terms of
providing accommodation that potentially meets RSL needs would be façade retention,
which would account for a small portion of the overall embodied energy within the
scheme.