Page 1

5(i)(d)
LRB-2025-05
LRB-2025-05
24/01732/IPL - Erection of dwellinghouse (in principle),
land 40 metres west of 8 Langley Place, Perth, PH2 7XB
Further Information
 Further information from the applicant on the proposed
entrance to the site and it’s physical acceptability and the
plans regarding the trees on the site, as requested by the
LRB on 26 May 2025 (Pages 683-689)
 Response to further information from Transport
Planning (Page 690)
 Response to further information from Tree Officer
(Pages 691-693)
 Further information from Planning Officer and
Development Plans Team on the open space element in
relation to National Planning Framework 4, the Council’s
Open Space Strategy and to provide information as to
why this site is designated as open space, as requested
by the LRB on 26 May 2025 (Pages 694-697)
 Response to further information from Applicant (Page
698-701)

Page 2

No embedded text on this page.

Page 3

Erection of Dwellinghouse at Land 40 Metres West of
8 Langley Place, Perth, PH2 7XB
Application Ref. No. 24/01732/IPL
Review Ref. No. LRB-2025-05
Additional Statement for Matters to be Reviewed:
We have been asked to provide further information on the proposed entrance to the site
and it’s physical acceptability, along with plans regarding the existing mature tress on the
site.
Regarding the mature trees on the Site, can we first state that none of the existing mature
tress will be removed, altered or harmed.
The two existing mature trees, one at the South-East corner of the Site and one further
along the West boundary are the main trees to be looked at, as the proposed vehicle
access to the Site is located between them, accessed from the existing parking and
turning area belonging to the applicant. Gean Tree Cottage will continue to have access
over the ground and two parking bays on the area of ground, outwith the proposed access
route.
The accompanying drawing, WD4 (Site Access) shows the tree positions and the route of
the proposed access, and the protected zones at each tree.
The area between the two protected areas, where the access will be formed, will have the
Beech hedge removed over an area of approximately 4.0 metres long. The hedge will be
replanted on site where the gate is removed.
The proposal is to Herras fence off the area around each tree, at a distance of ten times
the trunk diameter. This gives an area outwith the tree overhang and root coverage to form
the access. The Fence will be erected before any works on site begin.
The fence will be erected with supports that do not require pinning into the ground to avoid
any root damage to the trees.
Core Root Protection Panels will be installed on the route of the vehicle access, and gravel
laid over to form the vehicle access.
No materials, machinery, soil heaps, construction, etc will be placed or occur within the
fenced areas.
No change in ground levels will occur at the tress and within the fenced protected areas.

Page 4

The proposed site at present has an access gate located on the South boundary,
accessed from the core path. This gate will not be utilised and is proposed to be removed
and Beech hedge replanted, from the area where the access is formed, to match the
existing.
All other mature trees and boundary hedges to the proposed site will remain.
The boundary hedges are overgrown at present and will now be managed and dealt with
in terms of maintaining a healthy hedgerow.
In regard to the physical acceptability of forming the access from Mount Tabor Road, the
accompanying drawing, WD4 (Access Road), shows the route along Mount Tabor Road
and the proposed access, along with road widths and passing places.
Mount Tabor Road, is a tarmacadamed road that provides access to three properties at
this time.
The Road ends at the turning area belonging to the applicant, where the core footpath
then carries on from this point.
Accessed from a junction with Manse Road, Mount Tabor road varies in width from
approximately 4.15 metres to 4.85 metres along its length up to the start of the property at
Gean Tree Cottage. Along this area of the road there are accesses to two properties and a
large area at the rear of 4 Corsie Drive that are currently utilised as passing places.
Alongside Gean Tree Cottage up to the turning and parking area belonging to the
applicant, the road varies in width from 3.70 to 4.0 metres in width.
The road has a kerb at the South side, along its length, although this is very overgrown at
this time from the bushes and grass at the verge.
There are Lampposts along the length of Mount Tabor Road, set back from the Road some
2.0 metres. I would point out that the roadway from Manse Road up to the core footpath at
the entrance to the site is an adopted roadway.
The proposed Site would mean that Mount Tabor Road would now be serving four
properties in total. The Roads Department guidance / regulations are that a private road
can serve up to five / six houses. This is well within the allowance and also the road width
is greater than new private roads. These roads do not require footpaths.
With the road being more than 3.70 metres wide, the emergency vehicles (fire fighting
vehicles, etc) can be accommodated along the Roads length, as the requirement is a road
3.70 metres wide. I would stress again that the access road to the site is fully adopted by
Perth and Kinross Council.
The core footpath alongside the proposed site, accesses Mount Tabor Road from the
proposed site entrance and passes alongside Gean Tree Cottage, then heads off from
Mount Tabor Road to the North along a footpath to Muirhall Road. The extent of the core
footpath on Mount Tabor Road is some 62 metres. The Council Core Footpath map is
shown at the end of this statement.
There have been no accidents involving pedestrians on Mount Tabor Road. One more
dwelling would increase the traffic movement on the road, but in a very minimal way.
Average daily vehicle movements would be roughly 4 to 6 times a day from the Site and
Gean Tree Cottage, where the core footpath utilises the road.

Page 5

At the area of Mount Tabor Road where the footpath utilises the road, the traffic, which
would be to Gean Tree Cottage or the proposed site, would be travelling at very low
speeds as they are approaching their parking areas, so they would have naturally slowed
down. This again allows for the safety of pedestrians should they be walking on the road.
Beyond Gean Tree Cottage down to Manse Road, the road is wide enough to
accommodate pedestrians and vehicles safely.
The access road to Gean Tree Cottage  and the proposed site is signposted at Manse
Road as being a No Through Road and a dead end, therefore no other vehicles will be
accessing Mount Tabor Road other than occupiers or deliveries. As stated previously, the
No Through Road sign will automatically allow vehicles to drive at a minimal speed.
Mount Tabor Road has been adopted by Perth and Kinross Council, hence the kerbing and
the street lights. The Council adopted roads map is attached at the end of this statement,
showing the road outlined in purple, and confirming it is adopted.
In conclusion the above explains fully the location of the proposed site access, that no
mature trees are to be removed, and that tree protection will be provided during the works
on the site.
It also provides details of Mount Tabor Road being suitable to serve the access to the site,
being adopted by the Council, and also being suitable for emergency vehicles.
Although the core footpath utilises a short part of Mount Tabor Road, again we have
shown that pedestrian safety is provided but could also be improved should the council
utilise part of the verge as a footpath.

Page 6

Perth and Kinross Council Core Path Map

Page 7

Perth and Kinross Council Public and Adopted Roads Map

Page 8

SCALE OF METRES = 1-200
0 5 10 15 20 30 40 50
Gean Tree Cottage
7
OVERALL AREA OF
PLOT = 1639.40 sq.m.
INDICITIVE HOUSE
POSITION
VEHICLE ACCESS FROM
ROAD AND NOT TO DISTURB
PATHWAY LEADING FROM ROAD.
AREA HATCHED YELLOW
BELONGS TO APPLICANT.
GEAN TREE COTTAGE HAS
RIGHT OF ACCESS OVER
AREA FOR ACCESS TO GATE
AND FOR PARKING.
EXISTING MATURE
TREE
PARKING AND
TURNING AREA
ADJOINING LAND OUTLINED
AND HATCHED BLUE
BELONGING TO APPLICANT
START OF FOOTPATH.
NO VEHICLES BEYOND
THIS POINT
EXISTING MATURE
TREE TO REMAIN
UNTOUCHED.
1
2
3
4
5
8
7
6
EXISTING GATE TO BE
REMOVED AND BEECH HEDGE
PLANTED AS EXISTING
REMOVE PART OF BEECH HEDGE
AND OVERGROWN UNDERGROWTH
AT BOUNDARY OF PADDOCK
BETWEEN EXISTING MATURE TREES.
VEHICLE ACCESS TO BE FORMED
OUTWITH OVERHANG OF TREES TO
ENSURE ROOTS NOT DAMAGED.
SEE ADJACENT NOTE.
NOTES:
HERAS FENCING TO BE ERECTED OUTWITH
TREES  OVERHANG AND ROOTS COVERAGE AT
EITHER SIDE OF THE PROPOSED VEHICLE ACCESS.
THE FENCE WILL BE ERECTED WITH SUPPORTS THAT
DO NOT REQUIRE PINNING INTO THE GROUND.
CORE TREE ROOT PROTECTION PANELS TO BE
LAID OVER PROPOSED ACCESS AREA AND GRAVEL
ACCESS LAID OVER.
FENCE TO BE ERECTED BEFORE WORKS BEGIN.
NO MATERIALS/ PLANT / MACHINERY / SOIL
HEAPS / SUPPLIES / CONSTRUCTION ACTIVITIES,
TO BE INSIDE THE FENCED OFF AREA.
NO CHANGE IN GROUND LEVELS AT TREES
AND INSIDE THE FENCED AREA.
10 x TRUNK DIAMETRE AREAS FOR EACH TREE
SHOWN BY LIGHT BLUE CIRCLE.
FENCE TO BE OUTWITH THESE AREAS.
TREE 1 = 5920mm / Trunk = 592mm
TREE 2 = 6140mm / Trunk = 614mm
EXISTING MATURE
TREE
EXISTING MATURE
TREE
EXISTING MATURE
TREE TO REMAIN
UNTOUCHED.
DWG No.
WD3SA/ 2302 / 24
DESCRIPTION
Location Plan
CLIENT
Mr A. McKay
Working Drawing 3 SA
DRAWING TYPE
July 2025
DATE
-
-
REVISION
SCALE
TITLE
Proposed Dwellinghouse at
Site at
Mount Tabor Road
Kinnoull
Perth
ARCHITECTURAL SERVICES
3a Clerk Street
Brechin, Angus
DD9 6AF
Telephone
Office:      01356 623435
Mobile:     07802 742226
Fax:          01356 625182
Email:       jack@jwsouttar.com
Website:   www.jwsouttar.com
& BUILDING CONSTRUCTION
J.W. Souttar
SITE PLAN (SITE ACCESS)       1-200
1 - Looking East from Mount Tabor Road to
Gean Tree Cottage parking area and
Proposed Vehicle Access to Site
2 - Area of Beech Hedge
to be removed to
from entrance to Site
4 - Hedge at foot of
retained tree at
South-East corner of
Site and start of Footpath
5 - Gate to Gean Tree
Cottage looking West
from Parking area
6 - Looking South from
Paddock at existing
Gate and South-East
corner of Site
7 - Looking West from Paddock at
area between existing trees to have
Beech Hedge removed and Entrance
formed
Tree to
Remain
Tree to
Remain
Proposed access to
Site shown hatched
Red outwith overhang
and roots of trees and
taken from existing
Vehicle turning area.
3 - Area of Beech Hedge
to be removed to
from entrance to Site
8 - Looking West from Paddock at
area between existing trees to have
Beech Hedge removed and Entrance
formed
Tree to
Remain
Tree to
Remain
Proposed access to Site
shown hatched Red and
outwith overhang and
roots of mature trees

Page 9

SCALE OF METRES = 1-500
0 5 10 15 20 30 40 50
1
2
Mount Tabor House
Gean Tree Cottage
7
CORSIE DRIVE
18
10
LANGLEY PLACE
8
9
5
12 14 16
20
OVERALL AREA OF
PLOT = 1639.40 sq.m.
NORTH
ADJOINING LAND OUTLINED
AND HATCHED BLUE
BELONGING TO APPLICANT
INDICITIVE HOUSE
POSITION
VEHICLE ACCESS FROM
ROAD AND NOT TO DISTURB
PATHWAY LEADING FROM ROAD
OR MATURE TREES.
AREA HATCHED YELLOW
BELONGS TO APPLICANT.
GEAN TREE COTTAGE HAS
RIGHT OF ACCESS OVER
TO GATE AND FOR PARKING.
EXISTING MATURE
TREE
EXISTING MATURE
TREE
PARKING AND
TURNING AREA
4150
START OF FOOTPATH.
NO VEHICLES BEYOND
THIS POINT.
3700
4840
1
3
2 4MOUNT TABOR ROAD
5 6 7 8
Passing
Place
Passing
Place
Passing
Place
Footpath
ROAD IS TARRED AND
WIDE ENOUGH FOR
EMERGENCY VEHICLES
ROAD IS TARRED AND
WIDE ENOUGH FOR
EMERGENCY VEHICLES.
OVERGROWN BUSHES , ETC
TO VERGE REQUIRE CUTTING
BACK.
ROAD IS TARRED AND
WIDE ENOUGH FOR
EMERGENCY VEHICLES.
OVERGROWN BUSHES , ETC
TO VERGE REQUIRE CUTTING
BACK.
DWG No.
WD4AR/ 2302 / 24
DESCRIPTION
Location Plan
CLIENT
Mr A. McKay
Working Drawing 4 AR
DRAWING TYPE
July 2025
DATE
-
-
REVISION
SCALE
TITLE
Proposed Dwellinghouse at
Site at
Mount Tabor Road
Kinnoull
Perth
ARCHITECTURAL SERVICES
3a Clerk Street
Brechin, Angus
DD9 6AF
Telephone
Office:      01356 623435
Mobile:     07802 742226
Fax:          01356 625182
Email:       jack@jwsouttar.com
Website:   www.jwsouttar.com
& BUILDING CONSTRUCTION
J.W. Souttar
SITE PLAN (ACCESS ROAD)       1-500
1 - Looking East at Junction
onto Mount Tabor Road
2 - Looking West from Mount Tabor Road to
Junction to Manse Road
3 - Looking West to Passing
Place and Access to
4 Corsie Drive
4 - Looking North at Passing Place and
Access to property at Mount Tabor Road
5 - Looking West at Passing Place and
Access to property at Mount Tabor Road
6 - Looking West alongside
Gean Tree Cottage
7 - Looking West along Mount Tabor Road at Gean Tree Cottage 8 - Looking East along Mount Tabor Road at Gean Tree Cottage
parking area and Proposed Vehicle Access to Site
Proposed Vehicle
Access between
mature Trees outwith
overhang and roots

Page 10

1
SPR Planning Local Review Body
From: PKC Transportation & Development
Sent: 18 July 2025 11:39
To: Andy Baxter
Subject: 24/01732/IPL
Good morning, Andy, 
In respect of 24/01732/IPL,I note the site plan with further detail on the access road to the development site
(WD4AR/2302/24) detailing road widths and proposed opportunities for passing.
The house should be provided with a vehicle access route for fire-fighting vehicles from a public road to not
more than 45m from any door giving direct access to the interior of the dwelling. Fire and rescue service
vehicles should not have to reverse more than 20m from the end of an access road. Where any dead-end route
is more than 20m long, turning facilities should be provided. This can be a turning circle or a hammerhead.
Advice should be sought from Building Standards. Swept path tracking may be required. Further detail is
required to confirm that turning facilities can be delivered without adversely impacting the safety of users of the
core path. 
If planning permission is granted, we would apply a condition that all matters regarding access, vehicle parking
and turning facilities, walking and cycling facilities, the road layout, design and specification (including the
disposal of surface water), and waste management provision  shall be in accordance with the standards
required by the Council as Roads Authority (as detailed in the National Roads Development Guide). 
Carlyn

Page 11

Consultee Planning App. Ref: Request Date Response Date
Paul Kettles, Enforcement
Oicer (Trees)
24/01732/IPL 11.07.25 04.08.25
Proposed Development Erection of dwellinghouse (in principle)
Site Address   Land 40 Metres West Of 8 Langley Place Perth PH2 7XB  
Introduction         
Assessment         
Impact on Existing
Trees / Hedgerows                                                  
A review to the LRB in respect of an application which was refused
for the erection of dwellinghouse on land used as a paddock close
to 8 Langley Place, Perth, has been received. The site is out-with
the Kinnoull Conservation Area. Trees at the site are not subject to
statutory protection under the Town and Country (Scotland)
Planning Act 1997. 
This is a desktop response.  
The site plan shows 5 x existing mature silver birch trees situated
along the west boundary of the application site, and an access
being taken from Mount Tabor Road. 
I cannot identify any tree related documents, and there is very little
arboricultural information provided on the existing trees and
hedgerows at the site. I note from the google Streetview image that
there is an existing Gean & (what may be) an ash, and a hedgerow
close to the proposed access, and the same can be asserted from
the photos submitted within the application. There is no Gean or
ash marked on the site plan, and as stated, the plan indicates that
there are only 5 x mature silver birch at the site.  
It is noted that the supporting planning statement states that no
trees or hedges will be removed or aected by the proposal. In the
absence of supporting information in the form of an arboricultural
report & impact assessment, this statement must be challenged
as there is no evidence to support it. 
Due to the lack of information, the proposal cannot be properly
assessed against the criteria set out in Policy 6 of NPF4.  
In light of the existence of the trees and hedgerow noted above,
(which may be of certain landscape & biodiversity value), and
without knowing the detailed proposals for the development, (that
being the access type, the extent of car parking, the position and
routing of underground services & drainage proposals servicing the
site, and the footprint of any proposed dwelling), the statement
made by the applicant is not factually based, but merely
speculative.

Page 12

It is suggested that proposed development would include the
formation of an access, would inevitably result in removal of
existing vegetation, and may well adversely impact on the trees
noted above.  
Whilst there may be other reasons why these trees could be
removed, (health/structural condition), it is important that they are
properly considered. 
Guidance with Perth and Kinross’s Placemaking Guide Adopted
March 2020, advises, Existing trees and hedgerows should be
assessed through a professionally accredited tree survey.    
Guidance within Perth and Kinross’s Planning for Nature 2022
Adopted April 2020, Tree Surveys states:-  In respect of individual
trees, or groups of amenity trees, tree surveys will be required that
identify tree species represented, and details of tree condition
based on a Visual Tree Assessment (VTA), with recommended
works specified in accordance with BS3998: 2010
Recommendations for Tree Work. A tree survey must include a
scaled plan with trees plotted. Where tree surveys are required in
conjunction with proposed development, tree surveys must form
part of an Arboricultural Impact Assessment that includes the
aforementioned details, and includes tree categorisation
(illustrated on a tree constraints plan), mitigation measures, tree
protection systems, and a detailed tree protection plan that shows
the proposed site layout, overlaid with the Root Protection Areas
and clearly illustrates the Construction Exclusion Zone (CEZ), in
accordance with BS5837: 2012 Trees in Relation to design,
demolition and construction. The report should demonstrate how
trees removed will impact the site characteristics. It is essential
that reports include an Arboricultural Method Statement advising
how the proposed development can be developed acceptably,
avoiding and minimising adverse impact on existing trees, and
comments on the interface of trees being retained and
construction methodology, utility routes, proposed surface water
and foul drainage systems, and site-specific constraints.  
It is advised that an arboricultural report be provided that
encapsulates the requirements of BS5937: 2012, which identifies
all trees and hedges at the site, evaluates their respective values,
and provides an arboricultural impact assessment which
addresses the issue of how the development might impact the
existing trees and hedgerows, and provides suitable mitigation
measures.

Page 13

Landscaping           
Conclusion       
Recommendations              
The applicant advises that the site will be enhanced by the planting
of a native tree & hedgerow to the north boundary, and tree, shrub,
and wildflower planting. The statement advises that hazel, beech,
hawthorn, and blackthorn will be planted to form new hedgerows.
This landscape proposal would be welcomed, however, any tree
loss arising from the tree report would inform any proposed
compensatory planting requirements.    
The applicant has provided insuicient information to allow a
thorough assessment of the proposed development and its
potential impact on trees and hedgerows. The planning statement
has been questioned as it lacks evidence to support it.  
Uphold the decision to refuse the application for the reasons
referred to above.    
Paul Kettles
Planning Enforcement Oicer (Trees)
04th August 2025

Page 14

Erection of a dwelling @ Land 40 Metres West of 8 Langley Park, PH2 7XB 
I refer to the above, and the LRB’s request for more information concerning the
ongoing LRB review. 
In the order of the specific points which you have raised them, I’ll like to offer the
following additional comments, 
i) No specific comment required. It is ultimately a matter for the LRB to
decide whether or not they have sufficient information before them to
make a decision, and how much ‘new’ information they wish to accept and
consider. 
ii) A copy of the response from the Local Plan team is attached in terms of
the questions about our Open Space Strategy (OSS). 
iii) I have not seen any further information from the applicant, so I’m not able
to offer specific any comment on this point. I was not aware that new
information was permissible to be added during review. 
iv) As above, I have not seen any new information to review and circulate, but
I understand some details have been passed to the Transport Officer
direct. Her comments are attached. 
In terms of other matters, I would like to comment on the interpretation of Policy 20
of the NPF4. 
Part a) of Policy 20 states that ‘Development proposals that result in fragmentation
or net loss of existing blue and green infrastructure will only be supported where it
can be demonstrated that the proposal would not result in or exacerbate a deficit in
blue or green infrastructure provision, and the overall integrity of the network will be
maintained. The planning authority’s Open Space Strategy should inform this’ 
The area in question has been designated as open space within the LDP2 for its
visual amenity value, in a local context. It is not a functional areas of open space,
which is what the OSS will largely addres – once it is prepared by the Council. In
light of this, it is my view that the site is not necessary not green infrastructure as
such, which would normally be more applicable to functional areas of space where
there is a clear public use available ie North or South Inch areas. The terms of Policy
20 and the Open Space Strategy are therefore more aimed at those functional areas
of open space, as opposed to smaller ones which have perhaps visual amenity
qualities for the local area, and contribute positively to the character of those areas.
It may be the case that in future LDP2 it may only be larger and more functional
areas which are both included within the LDP2 as ‘protected areas of open space’,
and match those areas which are included within the Council’s Open Space Strategy
– however that might be a question for the LDP team. 
The OSS will include an audit of all areas referred to within the strategy, and clear
reasons for their inclusion with the OSS, which will inevitable then translate to the
LDP to come degree. New development within areas of open space which are
excluded from the OSS (and probably the LDP) would then be assessed against the
more generic amenity policies of the Development Plan (such as Policies 1 and 17 of
the LDP2.

Page 15

You will note that conflict with Policy 1 of the LDP2 was used for this decision, and
the loss of the area would have an adverse impact on the local area. 
It is too early to be certain whether or not this particular site will or will not be
included within the OSS or the next LDP2 as a protected area, but in the event of
this review being dismissed the applicant should be making representations to the
LDP2 team – as was the advice at pre-application stage 
Hope this helps, 
Many thanks, 
Andy Baxter 
Planning Officer

Page 16

1
SPR Planning Local Review Body
From: Dante Sosa
Sent: 14 July 2025 10:27
To: Andy Baxter
Subject: Re: LRB-2025-05
Morning Andy,
I was passed your enquiry as the officer responsible for the open space policy area and our strategy
development.
We are in the process of preparing our first Open Space Strategy and this is expected to be finalised at
the end of 2025. We are required to include all sites >0.2ha in the audit and have also included the
designated open space to review ahead of LDP3.
You are correct, I've checked the LDP2 open space layer which shows the "function" of the site is
landscape value. I've also found some background in LDP2's Examination Report (p. 471), please see
the reporter's comments below: 
"Mount Tabor Road H169
6. I recognise that under Issue 1 A Successful, Sustainable Place, it has been found that there is no
shortfall in meeting the housing land requirement in the Greater Perth Housing Market Area. Adequate
housing land has been provided to satisfy the requirements set out in the strategic development plan.
Accordingly, there is no strategic numerical justification to allocate further sites for housing within the
Greater Perth Housing Market Area. The land subject to the representation is located to the south of
the Murray Royal Hospital site MU336 and allocated as open space in the proposed plan. The pasture
land, along with the rest of the open space allocation, provides a visual break from the residential
development that has taken place in the wider surrounding area.
7. Housing development would detract from the rural character of the area and green network
provided by the open space allocation. Although the site may not contain protected species, in
general, green networks can also provide habitat and corridors for wildlife within urban areas. The
land is bounded to the west by a core path but is not available for public access. It is contended to be
effective and free of constraints. Nevertheless, it is a prominent green space when viewed from near
the properties of The Corner House and Tabor at Muirhall Road.
8. Despite the existence of some tree and shrub boundary vegetation, any intensive development of
the site would have an adverse effect on the setting of the category B listed Gean Cottage, which was
the childhood home of Sir Patrick Geddes. Potential still exists for re-use of the land as a paddock and
it has been allocated as an open space for several years, although not included in an open space
audit. The site was not taken forward to the Main Issues Report stage and the proposed change of this
part of the open space allocation was not the subject of full public consultation. Given the above and
in particular the provision of adequate housing sites elsewhere to meet the strategic housing needs of
the Greater Perth Housing Market Area, I conclude that the allocation of the land at Mount Tabor Road
is not currently justified. No modification."
It is too early to say whether this would remain designated, however I can share that the site was pre-
screened out of the full open space audit. The reason given by the surveyor was that this was a private

Page 17

2
garden with no public use or access. We still need to check the site's ecological qualities through the
blue-green infrastructure audit and we also have a live survey which may provide information on
whether this site is important to the community.
Generally, it is my view that designations should be given where sites have a clear public function or in
cases where they are important natural spaces. Other sites may offer more value by having
designations removed. There are a lot of factors (e.g. housing land requirement, community
consultations) and while I will make recommendations based on the OS audit findings the decision
will be down to the relevant locality officer.
Please let me know if you would like to discuss further. 
Kind regards,
Dante Sosa
Assistant Planning Officer
Development Plans
Perth and Kinross Council
LDP3 Call for Sites is now open:Local Development Plan 3 - Call for Sites - Perth & Kinross Council
Citizen Space - Citizen Space

Page 18

Erection of Dwellinghouse at Land 40 Metres West of
8 Langley Place, Perth, PH2 7XB
Application Ref. No. 24/01732/IPL
Review Ref. No. LRB-2025-05
Additional Statement for Matters to be Reviewed in Response to Local Plan Team
and Planning additional information regarding the Site being classed as Open
Space:
The Policy team / Planning Department were requested to provide more information on the
open space element in relation to the National Planning Framework 4, the Council’s Open
Space Strategy and why the site is designated as open space.
This request was sent on the 26th June with a deadline for returning the information of 10th
July. No reply was received by 10th July and a further email requesting the information was
sent on 11th July. The information was forwarded to ourselves on 1st August, so we
presume this was received by the Review Board on 31st July.
We would ask what the delay was in providing the information and why it can be
acceptable to delay the Review process by at least three weeks?
Policy 20 of the NPF4 states that ‘Development proposals that result in fragmentation or
net loss of existing blue and green infrastructure will only be supported where it can be
demonstrated that the proposal would not result in or exacerbate a deficit in blue or green
infrastructure provision, and the overall integrity of the network will be maintained’. It was
also stated that the Open Space Strategy should inform the above.
In response to the Planning Officers reply above, we can confirm that the proposal will not
affect any blue infrastructure at all.
Green infrastructure refers to Parks, trees, etc and not essentially the area of land in
question. With the house and driveway covering only 2.84% of the overall Site area, there
is little to no affect on green infrastructure either. No trees will be removed, altered or
harmed. The land is private so no parks will be affected.
In essence the blue and green infrastructure will not be affected by this proposal.
In regard to the Open Space Strategy, the Council will not have this until late 2025, so we
cannot comment on it.

Page 19

The Planning Officer also stated that the Site in question is allocated as open space in the
Local Development Plan (2019) as having visual appeal value, in a local context, and that
it is not a functional area of open space. This will be addressed by the OSS once it is
prepared later in the year. At this time it is unclear if the site in question will be included in
the OSS.
The Planning Officer then provides his view on the proposal, stating that the terms of
Policy 20 of the NPF4 and the future OSS will focus more on larger, public areas of open
space, as opposed to smaller ones which may perhaps have visual amenity qualities for
the local area, and contribute positively to the character of those areas.
In response we would point out that the land in question is a grassed overgrown Paddock,
with mature trees and overgrown hedgerows bordering it on the West and South
boundaries. The proposal is to erect a dwellinghouse at the Southern end of the site,
where it narrows, and at the top of the substantial rise in ground level from North to South.
The house is then not seen visually from Muirhall Road, the North boundary, and with the
trees and hedgerow to the South boundary, not seen from the Core Path at Mount Tabor
Road. The Southern and large remaining area of the site will have the hedgerows
maintained and wild meadow and tree plantations planted, which will enhance the visual
amenity greatly and also enhance wildlife and biodiversity.
Surely a dwellinghouse erected out of the view of the public and an enhanced open space
is much more appealing than an overgrown Paddock.
The Planner further comments that the future LDP and OSS will concentrate on the larger
open space areas and not small private ones as in question with this application. I think
there is no need to respond to that except to say that it does question the expectation for
the Site to be open space at this time.
The Planning Officer then states that the application was dealt with under Policy 1 of the
LDP2, and the loss of the area would have an adverse impact on the local area.
We would first point out that this was not the information the Planning Department were
asked for by the Review Panel.
In response we would state the proposed dwelling site will be located to the South-East
area of the overall site identified in the local plan as open space. It will be located between
existing properties at Langley Place and Mount Tabor Road and will retain all its historical
boundaries, with all hedges and trees retained. Further planting on the retained open
space and landscaping on the proposed dwelling site would further enhance the area.
The extensive enhancing of the open space area of the site, the area the public can view
from Muirhall Road, will improve the area from grass Paddock to a wild meadow and small
tree plantations, improving the visual impact and greatly enhancing the bio-diversity of the
area.
The proposed dwelling would be designed to be as ‘green’ and environmentally friendly as
possible, with the provision of Photovoltaic panels and battery storage, an Air source heat
pump to provide the heating and hot water, insulated well above building standard
requirements and utilising materials that are eco-friendly.
The design of the house would complement those properties surrounding it.

Page 20

Overall the enhancing of the open space, additional planting and landscaping and
provision of a modern dwellinghouse would greatly enhance the visual amenity of the area
at the same time aiding in the efforts against climate change.
The above meets all the criteria in Policy 1 of the LDP2 that is possible, with some of the
criteria not relevant to this Site.
Further information was provided by the Assistant Planning Officer for Development Plans,
and they stated that the Open Space Strategy is still being prepared and should be ready
late in 2025. It is unclear if the Site for the proposal will be included in the OSS.
It is also unclear if the Site will be included in the future Local Development Plan, as was
stated above by the Planning Officer.
A report carried out on the Site and it’s Open Space designation, in preparation of the
LDP2 (2019), was included in the reply to the Planning Officer.
At that time multiple applications for houses on the Site had been applied for. These were
for up to six dwellings and focused on the lower North area of the Site.
The Report leans towards a multiple house application on the Site and not a single
dwelling located to the South-East corner of the Site, with the majority of the Site retained
and enhanced Open Space.
The Report also alludes to the Greater Perth Housing market and the Housing allocation in
the Development Plan. A single house would not affect the housing market or the housing
allocation in any way.
The Report also states that the Site provides a visual break from the residential
development that has taken place. Again this relates to a larger development in the
Northern area of the Site. A single dwelling located in the South-Eastern pocket of the site,
at the top of the rise in the land, and with the main area of the site retained and planted
with wild meadow and tree plantations, the visual break in the residential development of
the area would be maintained and enhanced.
In Point 7 of the report, they state that housing development would detract from the Rural
character of the area. Again this is aimed at a larger development to the North area of the
site and not a single, secluded and well sited house located out of view in the South-East
corner of the Site.
They also mention wildlife habitat and corridors on the land. Again with this not being a
larger development and only a single dwelling and with the remainder of the site enhanced
with planting, and protected against future development, wildlife habitats and corridors
would be maintained. With the enhancement of the open space area, wildlife would be
encourage to flourish.
The Report also states that the site is a prominent green space when viewed from the
properties at Muirhall Road, the Corner House and Mount Tabor Cottage. As stated
previously this is based on a larger development to the North area of the site, the area the
public can readily view. The proposed Site location is at the top of the rise, in the South-
East corner, away from the area that can be viewed from Muirhall Road. This would
maintain the prominent green space viewed from the properties and Muirhall Road.

Page 21

Point 8 of the Report states that an intensive development would have an adverse affect
on the setting of Gean Tree Cottage, a Category B listed house on Mount Tabor Road,
neighbouring the site. It should be noted that the Conservation Officer had no concerns
that a single house proposal would have any affect on Gean Tree Cottage, as was
provided during the planning application. This point would then be moot.
In conclusion the request for further information and clarity on why the site was designated
as Open Space from the Policy team and OSS has not been answered fully in our opinion,
and still remains unclear. It is also unclear if the future OSS and LDP will designate the site
as open space as their strategy seems to be towards larger public parks, etc.
To designate private land as having a visual amenity, when it is located alongside a large
Public Park, does seem unusual and misplaced.
With the above in mind the proposal does retain a large area of open space, with the
house and driveway covering just 2.84% of the overall site. With the garden area
landscaped and the remainder of the site enhanced with wild meadow and tree plantation
planting, the visual amenity would still be maintained, and enhanced greatly.
The overall site can only be viewed from Muirhall Road to the North, looking South up the
site which rises significantly and narrows to the South-East boundary.
The South area of the Site cannot be viewed from Mount Tabor Road or the Core Network
Path due to the trees and hedgerows on the boundaries of the site.
The visual amenity of the site, only viewed from Muirhall Road would not be compromised.
The Assistant Planning Officer also states that the ‘Site was pre-screened out of the full
open space audit due to the site being private garden with no public use or access’.
Surely this leans towards the site not being designated as open space in the future Open
Space Strategy and Local Development Plan.
The proposal is clear in that the majority of the Site will be retained and maintained as
open space, and that the visual amenity will be maintained and enhanced.
It is, in our opinion, wrong that the proposal should be denied, when it is on private land
which is likely to have no future open space and visual amenity designation, but where we
are maintaining and enhancing the open space and visual amenity, with only a minimal
area of the site (2.84% of the total area) utilised for the footprint of the house and
driveway. Surely this can only be viewed as a positive outcome for the Site.

Page 22