Page 1

4(ii)(b)
LRB-2025-13
LRB-2025-13
25/00317/FLL - Alterations and extension to dwellinghouse,
1 Orchard Brae, Aberfeldy, PH15 2BF
Planning Decision Notice 
Report of Handling
Reference Documents

Page 2

No embedded text on this page.

Page 3

No embedded text on this page.

Page 4

No embedded text on this page.

Page 5

Report Of Handling
Delegated Report
Ref No 25/00317/FLL
Ward No P4- Highland
Due Determination Date 6th May 2025
Draft Report Date 8th April 2025
Report Issued by Andrew Rennie Date 11.4.25
Proposal: Alterations and extension to dwellinghouse
Location: 1 Orchard Brae Aberfeldy PH15 2BF 
Summary:
This report recommends refusal of the application as the development is considered to
be contrary to the relevant provisions of the Development Plan and there are no
material considerations apparent which justify setting aside the Development Plan.
Background and Description of Proposal
1 Orchard Brae is a detached dwellinghouse located within a residential area of
Aberfeldy. The two-storey property is located on a prominent and elevated corner plot
location, and serves as a focal property that fronts onto both Orchard Brae and
Kenmore Road, the latter being a popular tourist route. There are no other specific or
sensitive designations within the area.
This application seeks detailed planning permission for the erection of a wrapround
extension to the property’s principal (north-west) elevation and side (north-east)
elevation. 
Site History
00/00737/FUL Erection of 7 houses at 13 July 2000 Application Approved
20/01648/FLL Alterations and extension to dwellinghouse 17 December 2020
Application Approved
Pre-Application Consultation
Pre application Reference: none.
Development Plan
The Development Plan for the area comprises National Planning Framework 4 (NPF4)
and the Perth and Kinross Local Development Plan 2 (2019) (LDP2).

Page 6

National Planning Framework 4 
The National Planning Framework 4 (NPF4) is the Scottish Government’s long-term
spatial strategy with a comprehensive set of national planning policies.  This strategy
sets out how to improve people’s lives by making sustainable, liveable and productive
spaces.  
NPF4 was adopted on 13 February 2023. NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan.
The Council’s assessment of this application has considered the following policies of
NPF4:
 Policy 14: Design, Quality and Place
 Policy 16: Quality Homes
Perth and Kinross Local Development Plan 2 – Adopted November 2019
The Local Development Plan 2 (LDP2) is the most recent statement of Council policy
and is augmented by Supplementary Guidance.
The principal policies are:
 Policy 1A: Placemaking
 Policy 1B: Placemaking
 Policy 17: Residential Areas
Statutory Supplementary Guidance
 Supplementary Guidance - Placemaking (adopted in 2020)
Other Policies
Non-Statutory Guidance
None. 
National Guidance
The Scottish Government expresses its planning policies through The National Planning
Framework, Planning Advice Notes, Creating Places, Designing Streets, National
Roads Development Guide and a series of Circulars.

Page 7

Planning Advice Notes
The following Scottish Government Planning Advice Notes (PANs) and Guidance
Documents are of relevance to the proposal: 
 PAN 40 Development Management
Creating Places 2013
Creating Places is the Scottish Government’s policy statement on architecture and
place. It sets out the comprehensive value good design can deliver. It notes that
successful places can unlock opportunities, build vibrant communities and contribute to
a flourishing economy and set out actions that can achieve positive changes in our
places.
Consultation Responses
External
Scottish Water
No objection and advice provided, if minded to approve. Service cannot be guaranteed,
the applicant is advised to limit existing discharge rate and volume, consider alternative
rainwater options and no new connections to public infrastructure permitted. Additional
surface water shall discharge to existing private pipework within the site boundary.
There is live infrastructure in proximity to the development area that may impact on
Scottish Water assets (90mm MDPE main and 150mm surface water main) and the
applicant is advised to identify any potential conflicts by contacting the Asset Impact
Team via their customer portal (ref. DSCAS-0128909-Y6S).
Representations
Number of representations received: 0
Additional Statements Received:
Screening Opinion  Not Required
Environmental Impact Assessment (EIA):
Environmental Report
Not applicable
Appropriate Assessment under Habitats
Regulations
AA Not Required
Design Statement or Design and Access
Statement
Not Required
Report on Impact or Potential Impact eg Flood
Risk Assessment
Not Required

Page 8

Appraisal
Sections 25 and 37 (2) of the Town and Country Planning (Scotland) Act 1997 require
that planning decisions be made in accordance with the development plan unless
material considerations indicate otherwise.  The Development Plan comprises NPF4
and the Perth and Kinross Local Development Plan 2019.  The relevant policy
considerations are outlined in the policy section above and are considered in more
detail below.  In terms of other material considerations, involving considerations of the
Council’s other approved policies and supplementary guidance, these are discussed
below only where relevant.  
The determining issues in this case are whether; the proposal complies with
development plan policy; or if there are any other material considerations which justify a
departure from policy.
Policy Appraisal
Alterations and extensions to an existing dwellinghouse are generally considered to be
acceptable in principle. Nevertheless, consideration must be given to the scale, form,
massing, design, position, proportions and external finishes of the proposed
development, within the context of the application site, and whether it would have an
adverse impact upon visual, residential or environmental amenity.
Design, Layout and Amenity
The application seeks to erect a single-storey wraparound extension to the property’s
principal (north-west) and side (north-east) elevation. There are three elements to this
wraparound extension proposal: the front covered entrance, the side canopy cover and
the corner extension. The extension would see the existing garage reconfigured and
extended to form a gym and study space with covered canopy to the front and side.
As per Placemaking Supplementary Guidance, extensions should respect the shape,
scale and proportions of the existing building and relate to the roof pitch and original
building depth. In most cases an extension should be a subordinate addition in all
respects. Side extensions should provide an adequate and distinct separation between
properties, be set back from the frontage of the building to establish subordination to the
existing building, present a lowered roof ridge level to establish a separate identity to
the extension; and ensure that windows on extensions provide adequate light whilst
ensuring privacy to neighbouring properties. Front extensions should generally be
avoided, in particular where they dominate the principal elevation of the property and
where visual impact on an established streetscape is evident. However, modest
porches or canopies may be an acceptable addition, providing that the rhythm of a
repeating streetscene is not impaired and a well-designed proposal is presented.
Relating to design, form and layout, the overall development would be set lower than
the host property’s roof ridge line and would result in the creation of a new eaves line.
Neither characteristic presents a concern. However, the corner extension and covered
entrance would be forward of the established principal building line, which goes against

Page 9

Placemaking Guidance principles. The development would result in the introduction of
new roof pitches with valley formation, and is considered a cumulatively and visually
dominant addition to the principal (north-west) elevation. There are no concerns with the
‘light-touch’ side (north-east) elevation canopy but this element also extends beyond the
principal building line, and is therefore deemed as inappropriate. 
The proposed development is relative in scale to the host property but does not respect
host depth and proportions and therefore is not considered to be subordinate in all
respects, particularly as the development is not set back from the frontage of the
building and is not respectfully subservient to the principal elevation. Introduction of the
development would result in a visually obvious and dominant change to the established
streetscene, especially when viewed from Orchard Brae or from along Kenmore Road.
There are no concerns with the proposed material finishes. 
Early engagement with the agent was achieved and all concerns were relayed. A
request was made to seek amendment to the proposed development’s layout by setting
it back from the principal building line and to alter the roof form whilst providing flexibility
that a modest porch could be considered. The agent and applicant however had
decided to continue with the current submission, without revision.  
It had been mentioned that the current proposal is of reduced massing when compared
to previous permission ref. 20/01648/FLL on the same application site. This proposal
approved under ref. 20/01648/FLL however related to an acceptable and appropriate
two-storey extension which, in addition to other acceptable design detail, was set back
from the property’s principal elevation. There is no justification to deviate away from
established design and placemaking principles, in determining the current proposal.
With respect to residential amenity, there are no concerns with direct overlooking or
privacy impacts to neighbouring dwellinghouses to the east, south and south-east.
Equally, by virtue of the development’s scale, there would be no overshadowing
concerns.
There are no drainage implications associated with this proposed development.
However, please note the comments made by Scottish Water within the ‘consultation
response’ section.
Ultimately, the application site is both an elevated and focal corner plot dwellinghouse
with prominent visible character when travelling in and out from Orchard Brae, along
Kenmore Road and when exiting The Laurels (private road to the east). The proposed
development would result in a visually prominent addition and disrespectful to host
building lines. The property’s own degree of prominence, on a brae, justifies the
requirement to seek sensitive and appropriately designed development that complies
with relevant policies and guidance, whilst also respecting wider amenity, residential
context and in enhancing the area as a welcoming place, as highlighted by Creating
Places (2013).
The proposal fails to comply with NPF4 Policy 14 and 16 (g)(i); LDP2 Policy 1A, 1B and
17; and as informed by Placemaking Supplementary Guidance.

Page 10

Conclusion and Reasons for Decision
To conclude, the application must be determined in accordance with the Development
Plan unless material considerations indicate otherwise.  In this respect, the proposal is
considered to be contrary to the Development Plan.  Account has been taken of the
relevant material considerations and none has been found that would justify overriding
the Development Plan.
Accordingly, the proposal is refused on the grounds identified below.
Conditions and Reasons 
1. Approval would be contrary to National Planning Framework 4 Policy 14 (a)
where the proposed extension would not be designed to improve the quality of
the area, in this case the dwellinghouse and its corner plot setting; (b) where the
extension would result in an insensitive layout, roof pitch arrangement and
building line projection impacting on the property’s principal elevation legibility,
design influence, street frontage and sense of place, inconsistent with the
‘distinctive’ quality of a successful place; and (c) where the proposal is poorly
designed and inconsistent with the six qualities of successful places; and Policy
16 (g)(i) where the extension would have a detrimental impact on the principal
elevation character of the home in terms of design, positioning and layout
projection to the north-west. 
2. Approval would be contrary to the Perth and Kinross Local Development Plan 2
Policy 1A where the extension would not contribute positively to the quality of the
surrounding built environment, in this case to the dwellinghouse and its corner
plot setting, by virtue of its siting and design; Policy 1B (c) where the extension’s
design would not complement its surroundings by virtue of multiple incongruous
roof pitch arrangements and its disrespectful projection to the north-west, and (d)
where it would not respect the existing principal building line, would not reinforce
principal elevation legibility or character and would not reinforce the property’s
street frontage as a corner plot unit; Policy 17 (c) where the extension would not
result in an improvement to the area’s character; and as informed by
Placemaking Supplementary Guidance.
Justification
The proposal is not in accordance with the Development Plan and there are no material
reasons which justify departing from the Development Plan.
Procedural Notes
Not Applicable.
Plans and Documents Relating to this Decision
01 02 03

Page 11

No embedded text on this page.

Page 12

No embedded text on this page.

Page 13

No embedded text on this page.

Page 14

No embedded text on this page.

Page 15

No embedded text on this page.

Page 16

No embedded text on this page.

Page 17

No embedded text on this page.

Page 18

No embedded text on this page.

Page 19

No embedded text on this page.

Page 20

No embedded text on this page.