Democracy Spraffa

(c) Representations (Pages 153-162)

Perth and Kinross Council · 28 September 2026
Back to Local Review Body — 28 September 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.

Page 1

4(i)(c) 
LRB-2026-19 
LRB-2026-19 - 25/00534/FLL - Change of use and
alterations from office/commercial (Class 1A) to two
residential flats, The Royal Bank of Scotland, 8 The
Square, Aberfeldy, PH15 2DD 
Representations

Page 2

No embedded text on this page.

Page 3

Comments to the Development Quality Manager on a Planning Application
Planning
Application ref.
25/00534/FLL Comments
provided by
Noura Alhusami
Place Data technician -Transport
Planning
Service/Section Transportation &
Development
Contact
Details
TransportPlanning@pkc.gov.uk
Description of
Proposal
Change of use from office/commercial (Class 1A) to two residential flats, alterations
and installation of replacement windows
Address of site The Royal Bank Of Scotland, 8 The Square, Aberfeldy, PH15 2DD
Comments on the
proposal
The applicant is proposing a Change of use from office/commercial (Class 1A) to two
residential flats of one and two bedrooms, alterations and installation of replacement
windows at Aberfeldy.
The vehicle access to the public road network for the site will be via the THE
SQUARE public road and no new vehicle access onto a public road is proposed as
part of this application.
The applicant hadn’t proposed any of parking facilities, however there are an
available car parks maintained by Perth & Kinross Council nearby the site.
Insofar as the Roads matters are concerned, I have no objections to this proposal.
Recommended
planning
condition(s)
Recommended
informative(s) for
applicant
Date comments
returned 19/05/2025

Page 4

Comments to the Development Management & Building Standards Service
Manager on a Planning Application
Planning
Application ref.
25/00534/FLL Comments
provided
by
Lucy Alston
Service/Section Place Strategies Contact
Details
Development Contributions Officer:
Lucy Alston
Email:
DevelopmentContributions@pkc.gov.uk
Description of
Proposal
Change of use from office/commercial (Class 1A) to two residential flats,
alterations and installation of replacement windows
Address of site The Royal Bank Of Scotland 8 The Square Aberfeldy PH15 2DD
Comments on the
proposal
NB: Should the planning application be successful and such permission
not be implemented within the time scale allowed and the applicant
subsequently requests to renew the original permission a reassessment
may be carried out in relation to the Council’s policies and mitigation
rates pertaining at the time.
THE FOLLOWING REPORT, SHOULD THE APPLICATION BE
SUCCESSFUL IN GAINING PLANNING APPROVAL, MAY FORM THE
BASIS OF A SECTION 75 PLANNING AGREEMENT WHICH MUST BE
AGREED AND SIGNED PRIOR TO THE COUNCIL ISSUING A PLANNING
CONSENT NOTICE.
Primary Education
With reference to the above planning application the Council Developer
Contributions Supplementary Guidance requires a financial contribution
towards increased primary school capacity in areas where a primary school
capacity constraint has been identified. A capacity constraint is defined as
where a primary school is operating at over 80% and is likely to be operating
following completion of the proposed development, extant planning
permissions and Local Development Plan allocations, at or above 100% of
total capacity.
This proposal is within the catchment of Breadalbane Primary School.
Education & Children’s Services have no capacity concerns in this catchment
area at this time.
Recommended
planning
condition(s)
Summary of Requirements
Education: £0
Total: £0
Recommended
informative(s) for
applicant
Date comments
returned
27 May 2025

Page 5

1
Aaron Williamson
From: Aaron Williamson
Sent: 28 May 2025 12:27
To: Aaron Williamson
Subject: FW: Scottish Water – Application Response - 25/00534/FLL-  The Royal Bank Of
Scotland 8 The Square Aberfeldy PH15 2DD
From: Planning Consultations <PlanningConsultations@scottishwater.co.uk> 
Sent: 28 May 2025 11:08
To: Development Management <DevelopmentManagement@pkc.gov.uk>
Subject: Scottish Water – Application Response - 25/00534/FLL- The Royal Bank Of Scotland 8 The Square
Aberfeldy PH15 2DD 
CAUTION: This email originated from an external organisation. Do not follow guidance, click links, or
open attachments unless you have verified the sender and know the content is safe. 
25/00534/FLL -   Change of use from office/commercial (Class 1A) to two residential flats,
alterations and installation of replacement windows -   The Royal Bank Of Scotland 8 The Square
Aberfeldy PH15 2DD 
Audit of Proposal 
Good Morning  
Scottish Water has no objection to this planning application.  
I trust the above is acceptable however if you require any further information regarding this matter please
contact us on 0800 389 0379 or via the e-mail address below or at
planningconsultations@scottishwater.co.uk    
Kind regards, 
Ruth Kerr
Technical Analyst 
North Regional Team 
Strategic Development
Development Services
Scottish Water, The Bridge, Buchanan Gate Business Park, Cumbernauld Road, Stepps, Glasgow G33 6FB 
My Working Hours: Monday to Friday 8am till 3.35 pm,
Dedicated Freephone Helpline: 0800 389 0379
Managed Email Service DevelopmentOperations@scottishwater.co.uk
Scottish Water.
Trusted to serve Scotland.
------------------- Original Message -------------------
From: Local Planner <developmentmanagement@pkc.gov.uk>;

Page 6

2
Received: Fri May 16 2025 12:24:20 GMT+0100 (British Summer Time)
To: <planningconsultations@scottishwater.co.uk>;
Subject: Planning Application Consultation Request for Application No 25/00534/FLL
[**EXTERNAL MAIL** - Think Before You Click] 
Please see attached. 
The information in this email is solely for the intended recipients. 
If you are not an intended recipient, you must not disclose, copy, or distribute its contents or use them in
any way: please advise the sender immediately and delete this email. 
Perth & Kinross Council does not warrant that this email or any attachments are virus-free and does not
accept any liability for any loss or damage resulting from any virus infection. Perth & Kinross Council may
monitor or examine any emails received by its email system. 
The information contained in this email may not be the views of Perth & Kinross Council. It is possible for
email to be falsified and the sender cannot be held responsible for the integrity of the information
contained in it. 
General enquiries to Perth & Kinross Council should be made to enquiries@pkc.gov.uk or 01738 475000.  
Privileged/Confidential information may be contained in this Email and any files transmitted with it. If
you are not the intended recipient you should not retain, copy or use this Email for any purpose or
disclose all or part of its contents to any person. If you have received this Email in error please notify
the sender immediately and delete this Email from your system. Opinions, conclusions and other
information in this message that do not relate to the official business of Scottish Water ("SW"),
Scottish Water Horizons Ltd ("SWH"),Scottish Water International Ltd ("SWI") or Scottish Water
Solutions 2 Ltd ("SWS2") shall be understood as neither given nor endorsed by them. The contents of
Emails sent and received by SW, SWH, SWI and SWS2 are monitored. WARNING: Although SW, SWH,
SWI and SWS2 have taken reasonable precautions to ensure no viruses or other malicious software
are present, SW, SWH, SWI and SWS2 cannot accept responsibility for any loss or damage arising
from the use of this Email or attachments however caused. The recipient should therefore check this
Email and any attachments for the presence of viruses or other malicious software. Scottish Water
www.scottishwater.co.uk

Page 7

No embedded text on this page.

Page 8

Comments to the Development Quality Manager on a Planning Application
Planning
Application ref.
25/00534/FLL Comments
provided by
Simon Terkura
Service/Section HE/Flooding Contact Details
Description of
Proposal
Change of use from office/commercial (Class 1A) to two residential flats, alterations and
installation of replacement windows
Address of site The Royal Bank Of Scotland 8 The Square Aberfeldy PH15 2DD
Comments on
the proposal
No Objection
Recommended
planning
condition(s)
n/a
Recommended
informative(s)
for applicant
The applicant is advised to refer to Perth & Kinross Council’s Supplementary guidance on
Flood Risk and Flood Risk Assessments 2021 as it contains advice relevant to your
development.
Date comments
returned 19/06/2025

Page 9

Comments to the Development Management & Building Standards
Service Manager on a Planning Application
Planning
Application ref.
25/00533/LBC
25/00534/FLL
Comments
provided by
Jody Blake IHBC
Service/Section Conservation Contact Details
Description of
Proposal
Change of use from office/commercial (Class 1A) to two residential
flats, alterations and installation of replacement windows
Address of site The Royal Bank of Scotland, 8 The Square, Aberfeldy PH15 2DD
Comments on
the proposal
 
 
 
 
The subject site is a Category B listed building located within the
Aberfeldy Conservation Area. The building is a purpose-built bank
designed by Arthur George Sydney Mitchell and dates to 1885. The
former bank is a prominent architectural element within the
conservation area.
The proposal seeks listed building consent for change of use of the
ground floor from commercial to two flats. The current application
cannot be supported due to a lack of information required to
accurately assess the proposal.
The Planning (Listed Buildings and Conservation Areas) (Scotland)
Act 1997 places a duty on the Council to have special regard to the
desirability of preserving Listed Buildings or any features of special
architectural historic interest. Therefore, there is a presumption in
favour of the retention of historic windows and doors, as these are
key contributors to the character and special interest of a listed
building.
Accordingly, the starting point in the assessment of an application for
the replacement of historic windows and doors is whether their
removal is justified. Replacement windows are usually only permitted
in cases where the existing windows are not repairable, or where it is
fully demonstrated that they are incapable of economic repair. Only
when this is robustly evidenced will the removal of historic windows
usually be considered justified.
The acceptability of replacement windows is then dependent upon
an appropriate specification in terms of their design, materials,
framing thickness, glazing division, opening mechanism and astragal
profile and dimensions. Please note that the removal of internal
window shutters or steel framed windows will not be supported.
The PKC Placemaking Guide states that where it is proposed to
replace windows in a listed building, justification will be required in
order to process the application. This should take the form of an
illustrated report setting out the condition of each window and the
reasons for its replacement.
Policy 7 of NPF4 advises that proposals for the alteration or

Page 10

extension of listed buildings will only be supported where they will
preserve its character, special architectural interest and setting, and
this is consistent with the Act. In this case, the lack of information
about the significance of the building and how the impacts of
alteration would be successfully managed, prevent me from being
able to conclude that the proposals will preserve the building’s
character and special interest.
The Applicant should be directed to Trove where historic images and
plans can be found of the subject site. This should form the basis of
a heritage assessment of the existing building and impact statement
for the proposed works. The heritage assessment should include an
assessment of the interior of the building. Where possible, historic
features of the building should be revealed, such as the decorative
ceiling.
The Schedule of Works notes structural works are required;
however, no details have been provided for structural interventions.
As submitted, the current application cannot be supported due to a
lack of information required to accurately assess the proposal.
Date comments
returned 08/08/2025