Democracy Spraffa

(a) Notice of Review and supporting documents (Part 1) (Pages 9-760)

Perth and Kinross Council · 31 August 2026
Back to Local Review Body — 31 August 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.

Page 1

4(i)(a) 
LRB-2026-15 
LRB-2026-15 - 25/01116/FLL - Erection of restaurant unit
with drive thru facilities and formation of vehicular access,
parking areas, landscaping and associated works, land 70
metres west of Langdale, Perth Road, Blairgowrie, PH10
6EN 
Papers Submitted
by the
Applicant

Page 2

No embedded text on this page.

Page 3

Page 1 of 5
Pullar House 35 Kinnoull Street Perth PH1 5GD  Tel: 01738 475300  Email: onlineapps@pkc.gov.uk
Applications cannot be validated until all the necessary documentation has been submitted and the required fee has been paid.
Thank you for completing this application form:
ONLINE REFERENCE 100757266-001
The online reference is the unique reference for your online form only. The  Planning Authority will allocate an Application Number when
your form is validated. Please quote this reference if you need to contact the planning Authority about this application.
Applicant or Agent Details
Are you an applicant or an agent? * (An agent is an architect, consultant or someone else acting
on behalf of the applicant in connection with this application)  Applicant  Agent
Agent Details
Please enter Agent details
Company/Organisation:
Ref. Number: You must enter a Building Name or Number, or both: *
First Name: * Building Name:
Last Name: * Building Number:
Address 1
Telephone Number: * (Street): *
Extension Number: Address 2:
Mobile Number: Town/City: *
Fax Number: Country: *
Postcode: *
Email Address: *
Is the applicant an individual or an organisation/corporate entity? *
  Individual    Organisation/Corporate entity
Lichfields
Rachel
Affleck
Canning Street
Caledonian Exchange
EH3 8EG
United Kingdom
Edinburgh

Page 4

Page 2 of 5
Applicant Details
Please enter Applicant details
Title: You must enter a Building Name or Number, or both: *
Other Title: Building Name:
First Name: * Building Number:
Address 1
Last Name: * (Street): *
Company/Organisation Address 2:
Telephone Number: * Town/City: *
Extension Number: Country: *
Mobile Number: Postcode: *
Fax Number:
Email Address: *
Site Address Details
Planning Authority:
Full postal address of the site (including postcode where available):
Address 1: 
Address 2:
Address 3:
Address 4:
Address 5:
Town/City/Settlement:
Post Code:
Please identify/describe the location of the site or sites
Northing Easting
Perth and Kinross Council
The Oakwood
McDonald's Restaurants Ltd
LS8 2RB
Land 70 Metres West Of Langdale Perth Road Blairgowrie PH10 6EN
United Kingdom
743921
Leeds
317399
Easterly RoadMcDonald's Restaurants Ltd

Page 5

Page 3 of 5
Description of Proposal
Please provide a description of your proposal to which your review relates. The description should be the same as given in the
application form, or as amended with the agreement of the planning authority: *
(Max 500 characters)
Type of Application
What type of application did you submit to the planning authority? *
  Application for planning permission (including householder application but excluding application to work minerals).
  Application for planning permission in principle.
  Further application.
  Application for approval of matters specified in conditions.
What does your review relate to? *
  Refusal Notice.
 Grant of permission with Conditions imposed.
  No decision reached within the prescribed period (two months after validation date or any agreed extension) – deemed refusal.
Statement of reasons for seeking review
You must state in full, why you are a seeking a review of the planning authority’s decision (or failure to make a decision). Your statement
must set out all matters you consider require  to be taken into account in determining your review. If necessary this can be provided as a
separate document in the ‘Supporting Documents’ section: *  (Max 500 characters)
Note: you are unlikely to have a further opportunity to add to your statement of appeal at a later date, so it is essential that you produce
all of the information you want the decision-maker to take into account.
You should not however raise any new matter which was not before the planning authority at the time it decided your application (or at
the time expiry of the period of determination), unless you can demonstrate that the new matter could not have been raised before that
time or that it not being raised before that time is a consequence of exceptional circumstances.
Have you raised any matters which were not before the appointed officer  at the time the  Yes   No
Determination on your application was made? *
If yes, you should explain in the box below, why you are raising the new matter, why it was not raised with the appointed officer before
your application was determined and why you consider it should be considered in your review: * (Max 500 characters)
Erection of restaurant unit with drive thru facilities and formation of vehicular access, parking areas, landscaping and associated
works.
Please see enclosed Statement of Appeal.

Page 6

Page 4 of 5
Please provide a list of all supporting documents, materials and evidence which you wish to submit with your notice of review and intend
to rely on in support of your review. You can attach these documents electronically later in the process: * (Max 500 characters)
Application Details
Please provide the application reference no. given to you by your planning
authority for your previous application.
What date was the application submitted to the planning authority? *
What date was the decision issued by the planning authority? *
Review Procedure
The Local Review Body will decide on the procedure to be used to determine your review and may at any time during the review
process require that further information or representations be made to enable them to determine the review. Further information may be
required by one or a combination of procedures, such as: written submissions; the holding of one or more hearing sessions and/or
inspecting the land which is the subject of the review case.
Can this review continue to a conclusion, in your opinion, based on a review of the relevant information provided by yourself and other
parties only,  without any further procedures? For example, written submission, hearing session, site inspection. *
 Yes   No
Please indicate what procedure (or combination of procedures) you think is most appropriate for the handling of your review. You may
select more than one option if you wish the review to be a combination of procedures.
Please select a further procedure *
Please explain in detail in your own words why this further procedure is required and the matters set out in your statement of appeal it
will deal with?  (Max 500 characters)
In the event that the Local Review Body appointed to consider your application decides to inspect the site, in your opinion:
Can the site be clearly seen from a road or public land? *  Yes   No
Is it possible for the site to be accessed safely and without barriers to entry? *  Yes    No
Please see Appendix 3 of Statement of Appeal.
25/01116/FLL
13/03/2026
Holding one or more hearing sessions on specific matters
24/07/2025
Please see enclosed Notice of Review Form and Statement of Appeal.

Page 7

Page 5 of 5
Checklist – Application for Notice of Review
Please complete the following checklist to make sure  you have provided all the necessary information in support of your appeal. Failure
to submit all this  information may result in your appeal  being deemed invalid.
Have you provided the name and address of the applicant?.  *  Yes   No
Have you provided the date and reference number of the application which is the subject of this  Yes   No
review? *
If you are the agent, acting on behalf of the applicant, have you provided details of your name  Yes   No   N/A
and address and indicated whether any notice or correspondence required in connection with the
review should be sent to you or the applicant? *
Have you provided a statement setting out your reasons for requiring a review and by what  Yes   No
procedure (or combination of procedures) you wish the review to be conducted? *
Note: You must state, in full, why you are seeking a review on your application. Your statement must set out all matters you consider
require to be taken into account in determining your review. You may not have a further opportunity to add to your statement of review
at a later date. It is therefore essential that you submit with your notice of review, all necessary information and evidence that you rely
on and wish the Local Review Body to consider as part of your review.
Please attach a copy of all documents, material and evidence which you intend to rely on  Yes   No
(e.g. plans and Drawings) which are now the subject of this review *
Note: Where the review relates to a further application e.g. renewal of planning permission or modification, variation or removal of a
planning condition or where it relates to an application for approval of matters specified in conditions, it is advisable to provide the
application reference number, approved plans and decision notice (if any) from the earlier consent.
Declare – Notice of Review
I/We the applicant/agent certify that this is an application for review on the grounds stated.
Declaration Name: Miss Rachel Affleck
Declaration Date: 08/06/2026
Payment Details
Pay Direct     
Created: 08/06/2026 17:21

Page 8

Proposed drive-thru restaurant 
Land at Perth Road, Blairgowrie
Planning Statement
McDonald's Restaurants Ltd
24 July 2025

Page 9

© 2024 Nathaniel Lichfield & Partners Limited (trading as “Lichfields”), All Rights Reserved, is registered in England, no. 2778116.
Registered office at The Minster Building, 21 Mincing Lane, London EC3R 7AG.
Formatted for double sided printing.
Plans based upon Ordnance Survey mapping with the permission of His Majesty’s Stationery Office.
© Crown Copyright reserved. Licence number 10007707
67496/01/NWO/kmit
34014670v1

Page 10

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Contents
1.0 Introduction 1
Proposed development 1
Pre-application process 1
Planning application submission 2
Structure of Statement 2
2.0 Site context 3
Site and surroundings 3
Accessibility 3
Planning history 3
Summary 5
3.0 The proposed development 6
Restaurant building design 6
Access and parking 6
Economic impact 7
Environmental sustainability 7
Waste and use of recycled material in construction 8
The restaurant building 8
Sustainable development and climate change 9
Summary 9
4.0 Planning policy context 11
Relevant planning policy and guidance 11
NPF4 11
Perth and Kinross LDP 11
Supplementary guidance 12
5.0 Town Centre First Assessment 13
Policy context 13
McDonald’s commercial requirement 13
Methodology 14

Page 11

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Blairgowrie Town Centre 16
Summary 18
6.0 Compliance with planning policy 19
Principle of development 19
20-minute neighbourhoods 19
Sustainable economic growth 20
Main town centre uses 20
Health and wellbeing 21
Drive-thru developments 22
Traffic and transport 22
Amenity 23
Light 24
Energy 25
Ecology 25
Flood risk and drainage 26
Summary 26
7.0 Conclusions 28

Page 12

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 1 
1.0 Introduction
1.1 This Planning Statement has been prepared by Lichfields on behalf of McDonald’s
Restaurants Limited (‘McDonald’s’) to accompany a planning application for development
at Perth Road, Blairgowrie (‘the site’). 
1.2 Its purpose is to assist officers at Perth and Kinross Council (‘the Council’) in their
consideration of the accompanying planning application. 
Proposed development
1.3 This application seeks Planning Permission for: 
1.4 ‘Erection of drive-thru restaurant (Class 3/Sui Generis) with associated access, servicing,
car parking, landscaping and other associated works and infrastructure’. 
1.5 The proposed development comprises: 
• A new drive-thru restaurant, extending to 292 sq.m Gross Internal Area (‘GIA’) / 315
sq.m (‘GEA’); 
• 38 parking bays, including three accessible bays and two grill bays;
• Three motorcycle parking spaces;  
• Six cycle parking spaces in the form of three “Sheffield” cycle stands; 
• Vehicle access to and from the proposed development via the unnamed access road to
the south of the site; 
• Recycling and waste facilities across the site to encourage the proper disposal of waste; 
• Pedestrian access to the south of the site; and
• Within the site, pedestrian routes via paved footways and marked crossing facilities will
be provided. 
Pre-application process
1.6 A Pre-Application Enquiry was submitted in July 2024 to Perth and Kinross Council’s
Planning Service. A meeting with Perth and Kinross Council was then held on 9 August
2024, with representatives from Lichfields and McDonald’s in attendance at this meeting.
Formal written advice was then received on 11 November 2024. 
1.7 Council Officers provided helpful feedback on the proposed development. The Council
requested that a Town Centre First Assessment be carried out for Blairgowrie Town Centre.
The Council also outlined that an Ecological Impact Assessment, Transport Statement and
Noise Impact Assessment would be required. 
1.8 This Statement considers the relevant planning issues for the proposed development in the
context of the relevant planning policy and guidance. It also responds to the advice
provided during the pre-application stage by the Council.

Page 13

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 2 
Planning application submission 
1.9 This Statement is one of a suite of documents comprising: 
• Drawing package, including location and site plans (AEW Architects); 
• Planning application forms and certificates (Lichfields); 
• Planning Statement (this document); 
• Economic Statement (Lichfields); 
• Transport Assessment and Travel Plan (Andrew Moseley Associates (‘AMA’)); 
• Ecological Appraisal Survey (Encon Associates); 
• Landscape Scheme (Encon Associates); 
• Landscape Management Plan (Encon Associates); 
• Odour Report (Encon Associates); 
• Air Quality Assessment (Encon Associates);
• Flood Risk Screening and Drainage Impact Assessment (Glanville Consultants Ltd); 
• Drainage Maintenance Plan (Glanville Consultants Ltd);
• Construction Environmental Management Plan (Glanville Consultants Ltd); 
• Low and Zero Carbon (‘LZC’) Report (CDM Partnership);
• Lighting Plot (Signify); and 
• Lighting Impact Assessment. 
Structure of Statement
1.10 This Statement is structured as follows: 
• Section 2 – describes the site and its context, including the relevant planning history; 
• Section 3 – describes the proposed development;
• Section 4 – identifies the planning policy context of relevance to the proposed
development; 
• Section 5 – assesses the development in the context of the relevant town centre
assessment; 
• Section 6 – assesses the proposed development against the relevant planning policy
considerations; and
• Section 7 – sets out the conclusions of the Statement.

Page 14

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 3 
2.0 Site context
Site and surroundings
2.1 The application site comprises 0.29 hectares and lies to the west of Perth Road (A93). The
site benefits from Planning Permission in Principle as part of a wider development site for a
mixed-use development. This is discussed further below under Planning History.
2.2 The location of the site is shown in the Location Plan that has been submitted with the
application (ref. 13638_AEW_2473_1001). 
2.3 The site is bound to the south by Westpark Retail Park, which includes retail stores
occupied by Lidl, Home Bargains and a drive-thru Starbucks; to the east by Perth Road
(A93), with residential properties beyond; to the west by an area of Ancient Woodland; and
to the north by grassland which has Planning Permission for a housing development - 71
houses and 32 flats. Please see the Planning History section below for details.
2.4 The site does not contain or adjoin any listed buildings and is not located within a
conservation area. The Fir Hillock Scheduled Monument is located approximately 700m
north-west of the site, and a Site of Special Scientific Interest (Ardblair and Myreside Fens)
is located approximately 900m north-west of the site. In addition, an area of Ancient
Woodland is located approximately 120m to the west of the subject site. 
Accessibility
2.5 The accessibility of the site and the proposed development is considered in the
accompanying Transport Assessment (June 2025), prepared by AMA. 
2.6 The site is approximately 1.2 km from Blairgowrie Town Centre and is well served by
sustainable travel modes. Two bus stops are available on Perth Road (A93), directly to the
east of the stie, approximately 70m from the proposed development and can be accessed via
the existing pedestrian infrastructure. These bus stops are served by bus services 58 and 63
and provide connections to Blairgowrie and Perth seven days a week, and Carsie and
Rattray six days a week.
2.7 The site is also accessible by cyclists and pedestrians, with good quality and well-lit
pedestrian infrastructure along Perth Road. A toucan crossing is provided across Perth
Road adjacent to the site which provides a convenient crossing point to the residential area
to the east. Given the site is only 1.2km from Blairgowrie Town Centre, the site also
provides the opportunity for customers to walk from the town centre.  
2.8 Given the site is located directly adjacent to a retail park, the location of the proposed
development is in an area where customers are already in the area or on the road network,
therefore, it is considered an appropriate location for the proposals. 
Planning history 
2.9 The subject site is part of a wider development of 29 hectares which is allocated for a mix of
uses in the Perth and Kinross Local Development Plan (‘LDP’) (adopted November 2019).

Page 15

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 4 
Wider development site 
2.10 In December 2018, Planning Permission in Principle (ref. 17/00939/IPM) was granted for a
mixed-use development on the site. This comprised residential development, employment
land and commercial units, including a restaurant, hotel and drive-thru café. 
2.11 The proposed development site is located where the hotel was approved on the original
masterplan for the site (see approved site plan below). The hotel has not been developed. 
Figure 2.1 – Approved indicative site plan (Planning Permission in Principle ref. 17/00939/IPM)  
2.12 Following the approval of the Planning Permission in Principle, Planning Permission was
granted on 16 January 2020 for approval of matters specified in conditions in relation to
the earlier Planning Permission in Principle for the site (ref. 17/00939/IPM). This was for
the erection of retail units (Class 1) and the formation of parking areas (ref.
19/00163/AMM).  This development has been built out to the south of the subject site and
comprises Westpark Retail Park. 
Neighbouring sites 
2.13 A review of the planning portal has identified the following applications that have been
submitted to the Council since the approval of the Planning Permission in Principle that are
relevant to these proposals.  The first is an AMSC application for the site immediately to the
north of the application site associated with permission ref. 17/00939/IPM, the following
three are new slot in applications within the retail park area to the south of the application
site: 
• Ref. 22/00060/AMM – Planning Permission was granted on 23 March 2023 for the
approval of matters specified in conditions in relation to the earlier Planning
Permission in Principle (ref. 17/00939/IPM) for the erection of 71 no. dwellinghouses
and 32 no. flats. This development is located immediately to the north of the subject

Page 16

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 5 
site. A number of non- material variations have been considered by the Council and
conditions discharged since the permission was granted.
• Ref. 20/01696/FLL – Planning Permission was granted on 20 January 2021 for the
erection of a retail unit (Class 1) with associated access, car parking and servicing. This
relates to the Planning Permission for the Home Bargains to the south of the site, which
is now operational. 
• Ref. 21/01595/FLL – Planning Permission was granted on 20 December 2021 for the
erection of a coffee shop/takeaway and associated works. This relates to the now
operational Starbucks drive-thru to the south of the site. 
• Ref. 24/01573/FLL – A planning application was submitted for an EV charging hub at
Westpark Retail Park in November 2024. This application was refused in February
2025. 
Summary 
2.14 In summary, the site benefits from an existing Planning Permission in Principle and the
principle of commercial development in the proposed location has therefore already been
established. The site is on the edge of Westpark Retail Park which is an established
retail/drive-thru development. It is therefore considered that the principle of a drive-thru
restaurant in this location should be seen in the context of this established retail
destination.  It is our view that the proposed development would complement the
surrounding development and the character of the area providing additional services within
the retail park. 
2.15 The site also benefits from an accessible location with good links to cycle routes, public
transport and the local road network. Given the location of the site, the proposed
development would be compatible with the nearby commercial uses, and would
complement the retail function of the park, resulting in linked trips.

Page 17

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 6 
3.0 The proposed development
3.1 The accompanying application seeks Planning Permission for the development of a drive-
thru restaurant (Class 3/Sui Generis) to be operated by McDonald’s. The description of
development is therefore as follows: 
3.2 ‘‘Erection of drive-thru restaurant (Class 3/Sui Generis) with associated access, servicing,
car parking, landscaping and other associated works and infrastructure’. 
3.3 The restaurant will typically receive three deliveries per week. This will be scheduled to
arrive at quiet trading periods. It is proposed that servicing will be undertaken from within
the car park adjacent to the proposed restaurant building. More details about the proposed
servicing arrangements are set out in the accompanying Transport Assessment. 
Restaurant building design 
3.4 The restaurant building is proposed to be located to the east of the site, with car parking
provided to the west. The northern boundary of the site will comprise a tree buffer to screen
the development from the proposed housing development to the north (ref.
22/00060/AMM). 
3.5 The floorspace of the proposed drive-thru restaurant will extend to 292 GIA/315 GEA.
There will be a variety of different table sizes and seating types to suit customer needs. 
3.6 Internally, there will be a dining area, toilet facilities, kitchen space, staff room and other
associated spaces needed for the operation of such a premises, such as stores and chillers.
Externally, the restaurant will include a drive-thru lane and a small patio area with tables
and chairs.  
3.7 The Landscape Scheme (ref. A6760_01D) includes a range of soft landscape measures,
including new grass verges established with flowering lawn mix and new native hedgerows
and trees for ecological enhancement. Hard landscape includes surface footways to provide
a legible and safe pedestrian environment. 
3.8 Recycling and waste facilities will be provided across the site to encourage the proper
disposal of waste. 
Access and parking 
3.9 The proposed site layout has been designed with pedestrian and cycle access in mind. As set
out in Section 2 above, the site is located directly adjacent to Perth Road which is served by
two existing bus routes that operate seven days a week. These services (58 and 63) connect
the existing retail park with Blairgowrie Town Centre and further afield.
3.10 It is proposed that the existing footway to the south of the site will be extended to provide
access into the site, providing safe pedestrian access to the proposed development. Within
the site, pedestrian routes via paved footways and marked crossing facilities will also be
provided. Access for cyclists is proposed to be via the main site access.
3.11 Access for cyclists is proposed to be via the main site access and there will be provision of
six cycle parking spaces adjacent to the restaurant building.

Page 18

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 7 
3.12 Within the proposed drive-thru restaurant development site, a total of 38 general parking
bays will be provided which will include three accessible bays directly adjacent to the
restaurant building and will comprise three motorcycle spaces. 
3.13 In addition to this, the proposed drive-thru restaurant would be located directly to the
north of Westpark Retail Park, which is currently served by approximately 115 car parking
spaces. Given the site will effectively provide an extension to the retail park, it is expected
that a large proportion of customers travelling to the proposed McDonald’s restaurant will
be linked trips with the adjacent retail units and therefore, a proportion of customers will
park within the wider retail park. 
3.14 Vehicle access to and from the proposed development is proposed via the unnamed access
road to the south of the site, which is the servicing access for the retail park.  This will be 
via a new priority junction. The current bell mouth serving the development plot will be
stopped up. It is also proposed that the existing access road will be widened to
approximately 6 metres to permit two-way vehicle movements up to and including the
subject site. 
3.15 The main vehicle access into the retail park will remain unchanged and will continue to be
taken from a separate ghost island junction to the south. 
Economic impact 
3.16 The proposed development at Blairgowrie will provide a range of economic benefits. 
3.17 The restaurant is expected to employ approximately 80-100 staff once the development is
operational, comprising approximately 55-75 full time equivalent (‘FTE’) job roles for local
residents. The proposed development will therefore bring significant socio-economic
benefits through job creation and training opportunities to residents. It will also provide a
new local restaurant to Blairgowrie. 
3.18 Further consideration of the socio-economic impacts of the proposed development are
provided at Section 6 of this Statement and in the accompanying Economic Statement
(Lichfields, July 2025). 
Environmental sustainability 
3.19 The scale of McDonald’s business represents an opportunity to have a positive impact on
some of the biggest challenges facing the world today. The threat of climate change is one
such challenge and McDonald’s is proud of the investment they have made to reduce their
carbon footprint in the UK. 
3.20 McDonald’s was the first restaurant chain to set science-based greenhouse gas reduction
targets at a global level. Working with all franchisees, their aim is to reduce greenhouse gas
emissions related to all restaurants and offices by 36% by 2030. Additionally, McDonald’s is
committed to a 31% reduction in emissions intensity (per metric tonne of food and
packaging) across the supply chain by 2030. 
3.21 To meet these targets, McDonald’s buy 100% renewable electricity and have invested in
long term partnership agreements to develop the renewable energy infrastructure in the
UK. The absence of on-site fossil fuel use, together with McDonald’s electricity procurement

Page 19

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 8 
agreements, eliminates the production of greenhouse gases from on-site operations. In
recognition of global warming potential (GWP) associated with refrigeration gases,
McDonald’s have moved to the latest reduced GWP air conditioning refrigerants ahead of
any legislation in this regard.
3.22 The first McDonald’s restaurant built to the UKGBC net-zero emissions standard opened in
2021 in Market Drayton. McDonald’s ambition is to reach net zero emissions in restaurants
and offices by 2030, and their overall goal is to reach net zero emissions across the entire
business and value chain in the UK and Ireland by 2040.
Waste and use of recycled material in construction
3.23 McDonald’s are challenging themselves to reduce carbon emissions in construction and
use, and work with their suppliers to find solutions that will set high standards for the
industry. Building materials are sourced locally where possible and carbon-intensive
materials have been replaced with alternatives made with recycled car tyres, plastic bottles,
and white goods. This includes the following:
• Restaurant timber effect cladding panels: 47% recycled content; 
• Restaurant dark grey cladding panels: 47% recycled content;
• Corral grey cladding panels: Recycled IT equipment; and
• Plant parapet: Recycled plastic.
3.24 Materials for the building are selected to provide the required aesthetics combined with
maximum durability and robustness. The requirement for replacement, maintenance and
repair will be minimal during the building lifecycles, thus providing a good low level of
energy input over the whole lifecycle. Many of the materials used in the construction of the
building are recyclable at the end of life, including the grey cladding panels to the corral,
steel and rubber seals from the security doors, restaurant cladding panels, timber and
aluminium window and door frames and the black cladding panels to the plant parapet. 
3.25 From 2023, furniture will be sourced from recycled or certified materials and designed to
be recycled or reused at end of life, as part of the McDonald’s Plan for Change.
The restaurant building
3.26 The design of the new building has been directly influenced by sustainability and the
standard practices to enable the reduction in their carbon footprint.  Approximately, 90% of
new restaurants are built using modular construction techniques, which use considerably
less energy, inclusive of the reduction of the total number of deliveries to site during the
build. Modular construction takes place in a controlled environment, which allows a highly
monitored and efficient process, where leftover materials can be used in future projects and
ultimately reduce the general building waste. The construction time is also reduced,
minimising the potential disruption to neighbours.
3.27 In addition to the above, the walls of the building are insulated using British sheep’s wool
which is 100% biodegradable, and the extent of glazing has been reduced compared to
previous designs. PV panels will be installed to generate renewable energy.

Page 20

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 9 
3.28 The external shell is designed to prevent air leakage and achieve the U-value required by
current building regulation standards, and McDonald’s utilise a sophisticated building
management control system with specifically engineered energy reduction strategies to
maximise operating efficiencies. McDonald’s kitchen appliances have standby reminders,
and a metering system has been introduced which measures the amount of electricity used
in every half hour of the day. Restaurant Managers receive daily graphs to help them make
energy saving adjustments. 
3.29 All new restaurants are fitted with standard equipment and maintenance programmes, in
line with Green Building Guidelines, which were introduced as a McDonald’s Europe
initiative and include:
• Lighting - LED lighting is also used, resulting in a 50% reduction in energy use
compared to fluorescent lights. 
• Water - Auto shut-off taps fitted to wash-hand basins in addition to flow control limited
to 6l/min; replacement of urinals with waterless units and WCs fitted with dual flush of
4.5l and 3l flushes (unless external drainage requires greater volume). In addition,
systems are leak checked with hot water temperatures reduced to a maximum of 60
degrees C. Pipes are checked for missing insulation.
• HVAC - Automatic closures fitted to all internal doors and draft-proofing fitted or
repaired to all doors and windows, including the use of energy save reminder stickers in
the back of house area. Variable speed control fans are installed so that they are not
required to run when ventilation is not required, and room sensors installed to monitor
internal air temperatures.
Sustainable development and climate change
3.30 McDonald’s have a commitment to addressing the climate crisis. To achieve this, the
proposed development includes the following measures to enhance sustainability: 
3.31 A commitment to achieving net zero carbon emissions by 2040 – the proposed drive-thru
restaurant has been designed with this goal in mind; 
• Ensuring that the animal feed used by their suppliers is deforestation free by 2026; 
• The aim to source all packaging from renewable and recyclable materials by 2025; 
• Over 80% of kitchen waste is recycled, which equates to 40% of total waste; and 
3.32 An assessment of the proposed development in relation to sustainability is provided in
Section 6 of this Statement. A Low and Zero Carbon (‘LZC’) report (June 2025), prepared
by CDM Partnership, is also submitted with the accompanying application for
consideration. 
Summary 
3.33 In summary, the proposed development seeks to provide a new sustainable drive-thru
restaurant in an accessible location. Visual impact and landscape have been carefully
considered to ensure that the proposed development is not detrimental in this respect.

Page 21

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 10 
3.34 The proposed drive-thru restaurant will be built and will operate in a sustainable manner,
in line with McDonald’s Net Zero commitments to minimise any potential climate impacts. 
3.35 The proposed development will also provide significant economic benefits to Blairgowrie
and the wider area, both directly through investment and job creation, and indirectly
through business rates and the wider supply chain, which will enhance the local economy.

Page 22

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 11 
4.0 Planning policy context
4.1 This section outlines the planning policy context against which the accompanying planning
application should be assessed. An assessment of the proposed development in the context
of the planning policies outlined below is provided at Section 6 of this Statement. 
Relevant planning policy and guidance
4.2 The planning policy and guidance documents that are of relevance to the planning
application are as follows: 
• National Planning Framework 4 (‘NPF4’) – adopted February 2023; 
• Perth and Kinross Local Development Plan (‘LDP’) – adopted November 2019; and
• Supplementary guidance – Perth and Kinross Council. 
NPF4 
4.3 NPF4 was adopted by Scottish Ministers on 13 February 2023. It outlines the government’s
planning policies for Scotland and how these are expected to be applied. 
4.4 NPF4 supersedes the previous National Planning Framework 3 (June 2014) and Scottish
Planning Policy (June 2014). 
4.5 The key policies of relevance to the proposed development include: 
• Policy 1 – Tackling the climate and nature crises;
• Policy 2 – Climate mitigation and adaptation;
• Policy 3 – Biodiversity; 
• Policy 9 – Brownfield, vacant and derelict land and empty buildings;
• Policy 12 – Zero waste;
• Policy 13 – Sustainable transport;
• Policy 14 – Design, quality and place;
• Policy 15 – Local living and 20-minute neighbourhoods;
• Policy 22 – Flood risk and water management; 
• Policy 25 – Community wealth building; and
• Policy 27 – City, town, local and commercial centres.
Perth and Kinross LDP 
4.6 The Perth and Kinross LDP was adopted in November 2019. The LDP shows the site is part
of a wider allocation for mixed use development (ref. MU5) which identifies the site for 200
residential units, 4 hectares of employment uses and 4 hectares for education use. 
4.7 The key policies of relevance to the proposed development include: 
• Policy 1 – Placemaking;

Page 23

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 12 
• Policy 7B – Mixed-Use Sites;
• Policy 13 – Retail and Commercial Leisure Proposals;
• Policy 41 – Biodiversity;
• Policy 53C – Surface Water Drainage;
• Policy 56 – Noise Pollution; and
• Policy 60B – New Development Proposals.  
Supplementary guidance
4.8 Statutory Supplementary Guidance and non-statutory Planning Guidance form part of the
extant Perth and Kinross LDP and cover a range of topic areas. 
4.9 The relevant guidance that will be assessed as part of this Planning Statement are: 
• Supplementary Guidance – Placemaking (statutory);
• Planning Guidance – Delivery of Development Sites (non-statutory); and
• Planning Guidance – Planning and Biodiversity (non-statutory).

Page 24

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 13 
5.0 Town Centre First Assessment
5.1 The proposed development comprises a restaurant with drive-thru facility (Use Class 3/Sui
Generis) extending to 292 sq.m GIA / 315 sq.m GEA, to be operated by McDonald’s. 
Policy context
5.2 Part (b) of Policy 27 (City, town, local and commercial centres) of NPF4 states that
proposals for uses that generate significant footfall will not be supported outside town
centres unless a Town Centre First Assessment demonstrates that all centre and edge of
centre options have been sequentially assessed and discounted as unsuitable or unavailable. 
5.3 Despite the site’s location adjacent to an existing retail park and within a development site
for mixed-use development which is allocated in the extant LDP, the site is ‘out-of-centre’
in planning policy terms. 
5.4 As part of the pre-application discussions with Perth and Kinross Council, it was therefore
agreed that an assessment of Blairgowrie Town Centre would be undertaken. In accordance
with the provisions of NPF4, this centre has therefore been assessed to determine whether
there are any sequentially preferable sites in the town centre or indeed in any edge of centre
locations that could accommodate the proposed development. 
McDonald’s commercial requirement
5.5 In undertaking the Town Centre First Assessment, it is important to consider, from the
outset, the commercial need that the proposed development is seeking to meet. 
5.6 In this case, McDonald’s have a requirement for a drive-thru restaurant which can serve the
area of Blairgowrie. The subject site is considered the ideal location to meet McDonald’s
requirement because it is located adjacent to an existing retail park, where there are already
commercial operators. Indeed, McDonald’s are keen to locate their proposed restaurant
adjacent to other retail and commercial uses at Westpark Retail Park at Perth Road, given
the potential for linked trips.
5.7 Figure 5.1 identifies the subject site with a yellow star and demonstrates the area of
Blairgowrie is currently not well served by a conveniently accessible McDonald’s restaurant. 
5.8 The nearest McDonald’s restaurants are located in:
• Perth (Dunkeld Road) – 12.5 miles from the site
• Dundee (Camperdown) – 14.1 miles from the site
• Perth (Broxden) – 14.2 miles from the site
• Dundee (Reform Street) – 16.5 miles from the site
• Forfar – 16.6 miles from the site

Page 25

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 14 
Figure 5.1 – Existing McDonald’s Coverage (Approximate site location indicated by a yellow star) 
Source: Google Maps 
Methodology 
5.9 As outlined above, the Town Centre First Assessment assesses potential alternative sites
within and on the edge of Blairgowrie Town Centre. 
5.10 Figure 5.2 below is an extract from the extant LDP which shows the boundary of
Blairgowrie Town Centre (outlined in orange). The centre is located approximately 1.2km to
the north-east of the subject site which we have  indicated with black star.

Page 26

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 15 
Figure 5.2 – Extract from extant LDP showing Blairgowrie Town Centre (highlighted orange), subject site shown by black
star
Source: Perth and Kinross LDP (2019) 
5.11 The proposed drive-thru restaurant with associated surface level car parking responds to
the specific business model requirements of McDonald’s. As such, in following the
sequential approach, consideration has been given to whether the potential alternative sites
can accommodate the proposed development in its entirety. Consideration has also been
given to the size of each site, taking into account the size of the application site (0.29 ha).
5.12 Notwithstanding this, NPF4 states that applicants and local authorities should demonstrate
flexibility on issues in terms of scale. In this context, the suitability of alternative sites
should be assessed in their physical capability to accommodate the form of development
proposed in the application. 
5.13 This policy interpretation is consistent with the legal judgement on the sequential approach
in Tesco Stores Ltd v Dundee City Council Supreme Court Judgement (21 March 2012)
which is binding to Local Planning Authorities across the UK. This judgement confirmed
that the understanding of what is suitable (in the context of the sequential test) is not a
matter of planning judgement, but of legal interpretation. As such, if a developer of an out-
of-centre site has demonstrated a degree of flexibility in assessing whether they are
available and suitable, the sequential test is satisfied. 
5.14 Site visits were undertaken by Lichfields in November 2024 and June 2025. This led to the
identification of the following potential alternative sites located within/at the edge of
Blairgowrie Town Centre.

Page 27

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 16 
Blairgowrie Town Centre
Former Supermarket, Commercial Street
5.15 This site is located on Commercial Street, within Blairgowrie Town Centre and the
Blairgowrie Conservation Area. The site was formerly occupied by a supermarket which
ceased operation in August 2018. Since then, the site has been actively marketed. 
5.16 According to the agent’s particulars, the site is 0.89 ha and comprises a large detached
single storey self-contained retail unit with parking to the front and rear which would be
suitable for retail use.
5.17 The site does not meet McDonald’s requirements given that it is significantly larger than
McDonald’s require (the site is more than three times the size of the application site). It is
also located within a Conservation Area which is unlikely to be considered an appropriate
location for a drive-thru restaurant. As such, the site is not considered to be sequentially
preferable in this instance. 
Figure 5.2 – Former Supermarket, Commercial Street 
Source: Lichfields
Edge of Centre
5.18 In line with national and local planning policy, sites located within edge of centre locations
relative to Blairgowrie Town Centre have also been considered and assessed in terms of
their suitability, as set out below.

Page 28

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 17 
Former Littles Restaurant, Riverside Road
5.19 This site is located on Riverside Road, to the north-east of Blairgowrie Town Centre and
within Blairgowrie Conservation Area. The site comprises a Category B-listed church
building which was converted into a restaurant in 2015. 
5.20 While the site is situated in a location which is visually prominent to customers and passing
traffic, the size of the site is only 0.15 hectares and therefore is not large enough to
accommodate the required restaurant and drive-thru lane. Additionally, the building itself
is a prominent building within Blairgowrie Conservation Area and is a Category B-listed
building as a result of its architectural qualities and significance and as such, it is unlikely
that this could be demolished to facilitate the development of a McDonald’s drive-thru
restaurant as proposed in the subject application.
5.21 Furthermore, the site currently benefits from Planning Permission and Listed Building
Consent (approved July 2024, ref. 24/00698/FLL) to change part of its use to a fitness
studio (class 11) and undertake associated alterations to the building which indicate that the
building is unlikely to still be available.
5.22 As such, this site is not considered to meet McDonald’s commercial requirements and is
therefore not considered to be suitable to accommodate the proposed development. 
Figure 5.3 - Former Littles Restaurant, Riverside Road 
Source: Lichfields

Page 29

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 18 
Travis Perkins, Welton Road 
5.23 This site is located on the edge of Blairgowrie Town Centre within a trading estate. It is
safeguarded in the LDP for employment uses. The site is currently being actively marketed
for lease and marketing collateral indicates that the floorspace of the unit is 700 sq.m. The
existing building is therefore significantly larger than McDonald’s require and not suitable
for conversion. 
5.24 This site has therefore been discounted as not suitable to accommodate the proposed
development. 
Figure 5.4 – Travis Perkins, Welton Road 
Source: Lichfields
5.25 A number of other units were identified as vacant within and at the edge of Blairgowrie
Town Centre, but they have been discounted as too small to accommodate the proposals. 
Summary 
5.26 McDonald’s have specific locational requirements for a restaurant at Blairgowrie. The
subject site meets this requirement. 
5.27 There are no sequentially preferable opportunities within or on the edge of Blairgowrie
Town Centre that could realistically accommodate the proposed development. While a
number of vacant sites have been identified, none are suitable for the proposed
development and it is concluded that there are no sequentially preferable development
opportunities. 
5.28 On this basis, it is concluded that the proposals meet the requirements of Part (b) of Policy
27 of NPF4.

Page 30

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 19 
6.0 Compliance with planning policy 
6.1 This section assesses the proposals against the relevant planning policy and guidance
identified in Section 4 of this Statement. 
6.2 There are clear arguments that weigh in favour of the proposed development which are set
out below. 
Principle of development 
6.3 NPF4 Policy 9 (Brownfield, vacant and derelict land and empty buildings) part b) states
“proposals on greenfield sites will not be supported unless the site has been allocated for
development or the proposal is explicitly supported by policies in the LDP”.  
6.4 The site is located on a vacant, greenfield site. However, the site forms part of a wider
allocation in the LDP for mixed use (LDP ref. MU5). It is therefore allocated for
development in the LDP and subject to LDP Policy 7B (Mixed-Use Sites). 
6.5 Policy 7B (Mixed-Use Sites) states areas identified for mixed use are intended to promote
the integration of employment generating opportunities with housing. It states, within
these areas, a range of uses such as housing, offices and leisure will be acceptable, provided
they are compatible with the amenity of adjoining uses. 
6.6 On this basis, it is considered that development of a McDonald’s restaurant is acceptable
given that the site is located adjacent to an existing retail park, so it will be seen in the
context of this neighbouring development.  The proposed development would also be
complementary to the neighbouring business uses in the surrounding area as it would
provide a destination for employees of and visitors to the neighbouring businesses and a
new restaurant for local residents. 
6.7 The principle of development in this location has also already been established by Planning
Permission in Principle ref. 17/00939/IPM. This therefore demonstrates that the location is
capable of accommodating development, without impacting the character of the wider area. 
6.8 It is therefore considered that the proposals will relate to the scale and character of the
area. The proposals therefore comply with NPF4 Policy 9 (Brownfield, vacant and derelict
land and empty buildings) and LDP Policy 7B (Mixed-Use Sites). 
20-minute neighbourhoods
6.9 NPF4 Policy 15 (Local Living and 20-minute neighbourhoods) encourages development
proposals to support local living and reduce the need to travel. 
6.10 As shown in Figure 5.1 of this report, there are no McDonald’s restaurants within 20km of
Blairgowrie. The proposed development would therefore provide a more conveniently
accessible restaurant for customers who live and work in Blairgowrie. The proposed
development would also provide residents of Blairgowrie with the opportunity to walk or
cycle to a McDonald’s restaurant, encouraging/supporting sustainable travel. 
6.11 In planning terms, the addition of a new restaurant in Blairgowrie is clearly beneficial as it
will provide an opportunity to reduce the distance local people are travelling to access a

Page 31

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 20 
McDonald’s restaurant and is likely to reduce overall traffic levels/traffic demand. The
proposals therefore comply with NPF4 Policy 15 (Local living and 20-minute
neighbourhoods) as the new restaurant will reduce the need to travel as far to visit a
McDonald’s restaurant. 
Sustainable economic growth
6.12 NPF4 Policy 25 (Community wealth building) part (a) states that “development proposals
which contribute to local or regional community wealth building strategies and are
consistent with local economic priorities will be supported”. This includes local job
creation, supporting community led proposals and increased spending within communities.
Part (b) of Policy 25 does not apply. 
6.13 The proposed development is consistent with local economic priorities and will create a
significant number of economic benefits. This includes: 
• Supporting 140 direct FTE construction jobs, as well as supporting a further 120
indirect and induced FTE jobs during the construction phase;
• Generating an additional £4.1 million of GVA during construction;
• Creating 80-100 direct headcount jobs (55-75 direct FTE jobs) on-site once the
development is completed and operational – and a further 30 indirect and induced
jobs; and
• Delivering an uplift in business rates revenue in the range of £39,000 to £42,500. 
6.14 McDonald’s also support local communities in a wide variety of ways. This includes
delivering strong staff training programmes, investing more than £43 million in training
each year; providing financial support to improve the standards and growth of community-
led football teams; and McDonald’s operate their own independently registered charity,
Ronald McDonald House Charities UK, which helps support families while their children
are in a hospital or hospice. 
6.15 Overall, it is considered that the proposal accords with NPF4 Policy 25 (Community wealth
building). 
Main town centre uses
6.16 The proposed development is for a drive-thru restaurant (Class 3/Sui Generis) extending to
292 sq.m GIA / 315 sq.m GEA. The site is out of centre in planning policy terms. 
6.17 Policy 27 (City, town, local and commercial centres) of NPF4 focuses on cities and town
centres and is relevant to the proposed development. LDP Policy 13 (Retail and Commercial
Leisure Proposals) also requires uses that will generate a significant footfall to accord with
the Town Centre First approach. It is assumed that since NPF4 was adopted after the LDP,
new development proposals should focus on the sequential requirements set out in NPF4. 
6.18 Part (a) of Policy 27 states “development proposals that enhance and improve the vitality
and viability of city, town and local centres, including proposals that increase the mix of
uses will be supported”. This section of the policy does not specifically apply because the
proposal is not located within a town centre.

Page 32

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 21 
6.19 Part (b) of Policy 27 states “development proposals will be consistent with the town centre
first approach. It states that proposals for uses which will generate significant footfall will
not be supported outwith town centres unless a Town Centre First Assessment has been
carried out. 
6.20 As outlined in Section 5 of this Statement, a comprehensive Town Centre First Assessment
has been undertaken to determine whether there are any potential alternative sites in
sequentially preferable locations that could accommodate the proposed development. As it
has been demonstrated that none of the sites identified are suitable or available, it is
considered that the proposals accord with Part (b) of Policy 27 (City, town, local and
commercial centres) of NPF4.
Health and wellbeing
6.21 NPF4 Policy 27 (Part (c)) states “development proposals for non-retail uses will not be
supported if further provision of these services will undermine the character and amenity
of the area or the health and wellbeing of communities particularly in disadvantaged
areas. These include: 
• Hot food takeaways, including permanently sited vans; 
• Betting offices; and
• High interest money lending premises”. 
6.22 The proposed development is not likely to impact on the character and amenity of the area,
given it is located adjacent to an established retail park and will therefore be seen in the
context of this development. Additionally, the proposed development will bring significant
economic, social and regeneration benefits to Blairgowrie as it will bring a prominent, well-
connected, vacant site into use, along with significant job creation and training
opportunities. 
6.23 In terms of health and wellbeing, it is important to highlight that McDonald’s supports the
promotion of healthier lifestyles and tackling obesity and is committed to giving their
customers a range of options and supporting them to better understand the choices they
make. Nutritional information is presented in a variety of ways to customers, from nutrition
labelling on select food packaging, as well as displaying calories on menu boards.
6.24 McDonald’s nutritional strategy in the UK has been in place for over 15 years. During this
time, McDonald’s has reformulated over 200 of their ingredients and invested heavily in
broadening its menu of balanced healthy options. McDonald’s has introduced more salad
options, as well as fruit and vegetable bags, orange juice, mineral water and organic semi-
skimmed milk. Currently 92% of the core food and drink menu is under 500 calories. 
6.25 In addition, McDonald’s seeks to encourage young people to have active lifestyles and has
supported community football through their longstanding partnerships with the four UK
football associations. McDonald’s now has over 600 Fun Football Centres that provide
hundreds of free football sessions designed with their UKFA partners and delivered by a
team of fully qualified coaches across the UK. It is important that this, and the above
information on McDonald’s nutritional strategy, is taken into account as part of the
determination of the subject application.

Page 33

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 22 
6.26 Given the above, it should be clear that the proposed McDonald’s approach is very different
from that of other hot food takeaway operators who do not operate such a wide-ranging
menu, or provide customers with information on nutrition and calories to help customers
make an informed choice. This should therefore be taken into account when considering the
proposed use. 
Drive-thru developments 
6.27 NPF4 Policy 27 (Part (d)) states “drive-through developments will only be supported
where they are specifically supported in the LDP”. 
6.28 As NPF4 was adopted on 13 February 2023, Part (d) of Policy 27 should be considered in
the context of the transitional arrangements as set out by the Scottish Government in
February 2023. This makes clear that there is no ban on drive-thru developments, but
rather local authorities should consider the need for drive-thru development in forthcoming
LDPs. Additionally, there must be time for LDPs to be updated before this policy can be
properly applied. 
6.29 The guidance further states that in applying Policy 27(d) and whether such developments
are supported, planning authorities may regard wider uses that are compatible with the
drive-thru function to be included, as there is no single class of development that this
relates to and may sometimes be considered as sui generis. Suitable locations may include
for example those allocated for Class 1 shops or Class 3 food and drink. 
6.30 On that basis, in the absence of a ‘new style’ LDP, prepared in the context of NPF4 and the
new policies it has introduced, proposals for drive-thru related development should be
considered against the full range of policies set out within the existing development plan,
i.e. in this case, NPF4 and the Perth and Kinross LDP (November 2019). 
6.31 In this context, the proposed development is located adjacent to an established retail park,
where a mix of Class 1, Class 3 and drive-thru uses are located. The proposed development
would be compatible with these nearby commercial uses, and indeed, would complement
the retail function of the park, resulting in linked trips.
6.32 It is essential that planning balance is applied to all decision making. Decisions should be
based on the individual facts and circumstances of the case and consideration should be
given to the wider policies of the development plan. The site is allocated for mixed-use
development and benefits from Planning Permission for commercial development. It is also
a well-located site next to public transport uses, so it is an ideal location for a drive-thru
development. This is also demonstrated by the fact that a drive-thru unit already operates
adjacent to the site. 
Traffic and transport 
6.33 NPF4 Policy 13 (Sustainable Transport) calls for development proposals to be located in
areas that can be accessed by sustainable modes of transport. LDP Policy 1 (Placemaking)
and LDP Policy 60B (New development proposals) also require new developments to
prioritise active travel and aim to reduce reliance on the private car. 
6.34 A Transport Assessment and Travel Plan have been prepared by AMA and accompany the
planning application.

Page 34

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 23 
Sustainable transport 
6.35 The site is accessible by walking, cycling and public transport. The proposed development
will be accessible on foot from the surrounding residential area of Blairgowrie, including
Blairgowrie Town Centre, and lies in close proximity to bus stops, so will therefore be
accessible by public transport. Further details of opportunities for sustainable access to the
site are discussed in the submitted Travel Plan. 
Access and trip generation 
6.36 The site will be accessed by all modes of transport via a new priority junction to the south of
the site. The current bell mouth serving the subject site will be stopped up. The access road
will be widened to approximately 6m to permit two-way vehicle movements up to and
including the McDonald’s site. It will then continue west through a one-way carriageway,
for further access to the retail park. The main vehicle access into the retail park will remain
unchanged and will continue to be taken from a separate ghost island junction to the south. 
6.37 Given the nature of the development, it is concluded that the majority of vehicular trips to
McDonald’s restaurants will be ‘pass by trips’, with customers already be on the local road
network. The Transport Assessment demonstrates that on a Friday afternoon peak, 13% of
trips to the McDonald’s restaurant could be expected to be additional trips, and 87% would
be from vehicles already on the road network. For the Saturday peak, 16% would be
additional trips and 84% already on the road network. Thus, the modelling undertaken in
the Transport Assessment demonstrates that the traffic associated with the development
can be accommodated on the surrounding highway without having a detrimental impact.
Parking
6.38 The proposals include for 38 general parking bays, including three accessible spaces and
two reserve bays. There will also be three motorcycle spaces and six cycle parking spaces in
the form of “Sheffield” stands. The proposed level of car parking and is therefore considered
sufficient and will meet the anticipated demand of the proposed restaurant. 
6.39 In addition to this, the proposed drive-thru restaurant would be located to the north of
Westpark Retail Park, which is currently occupied by approximately 115 car parking spaces.
Given the site is located within a retail park, it is expected that a large proportion of
customers travelling to the proposed McDonald’s restaurant will be linked trips with the
adjacent retail units and therefore, a proportion of customers will park within the wider
retail park.
6.40 In summary, it is considered that the proposal accords with NPF4 Policy 13 (Sustainable
Transport); LDP Policy 1 (Placemaking); and LDP Policy 60B (New Development
Proposals). 
Amenity 
6.41 NPF4 Policy 14 (Design, quality and place) and LDP Policy 1 (Placemaking) set out that
development proposals should be designed to improve the quality of the area. 
6.42 LDP Policy 56 (Noise Pollution) states there will be presumption against the siting of
development proposals which will generate high levels of noise in the locality.

Page 35

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 24 
6.43 The individual issues that may have potential to impact on amenity enjoyed by residents
living in the local area are discussed below. 
Noise
6.44 During pre-application discussions with Perth and Kinross Council, it was noted that the
acoustic impact of the proposals should be considered in the assessment of the planning
application. 
6.45 Acoustic surveys have been undertaken to determine the existing noise conditions on site
and to reach conclusions about the predicted noise levels associated with the proposed
development during the operational phase of development and their impact. A Noise
Impact Assessment is in the process of being finalised and will be submitted to the Council
for consideration in due course in line with the requirements of Policy 56 – Noise Pollution.
Air quality 
6.46 An Air Quality Assessment, prepared by Encon Associates, has been prepared an
accompanies this planning application. This report has been prepared in accordance with
IAQM Guidance and discusses the effects of the proposed development on local air quality. 
6.47 The report identifies that due to the proximity of nearby residential receptors, the site is
considered to have a low risk of impacts with regards to dust soiling and PM10
concentrations. However, following the implementation of appropriate mitigation
measures, impacts associated with the construction of development are likely to be
insignificant. 
6.48 The report identifies that the proposals will not generate a significant number of additional
vehicle movements on the adjacent road network. Impacts on local air quality associated
with operational traffic will be negligible. Furthermore, all energy provision will be
provided by low emission or non-combustible sources, therefore it is concluded that on-site
emissions will be negligible. This means that no mitigation is necessary.
6.49 Overall, the Air Quality Assessment concludes that air quality impacts as a result of this
development are not likely to be significant. On this basis, the proposed development
complies with national air quality legislation and NPF4 Policy 14 (Design, quality and
place). 
Light 
6.50 A Lighting Impact Assessment of the proposed development has been prepared by LAUK
Lighting to accompany the application.  The assessment examines each of the application
site’s boundaries, verifies the effective use of LED optics and the lux contours that have
been achieved and then considers the potential impact on nearby uses (including
neighbouring properties), ecology and the preservation of the night sky. 
6.51 The assessment concludes that the proposed lighting design will not have any obtrusive
lighting impact on nearby residential dwelling including the southern facades of the
approved residential properties to the north of the site. The lighting of the site has been
designed to avoid adverse impacts on airborne wildlife activity in accordance with the
recommendations of the Institute of Lighting Professionals for developments in areas of

Page 36

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 25 
any potential airborne wildlife activity. Additionally, the use of downward projection
luminaires set at zero tilt will eliminate any potential night sky pollution and the proposed
lighting design eliminates any light spill into nearby woodland.
6.52 As such, the proposed lighting of the development does not create any adverse impact on
the amenity of surrounding uses and is therefore compatible with its setting and
surroundings in line with the requirements of NPF4 Policy 14 (Design, quality and place).
Energy 
6.53 NPF4 Policy 1 (Tackling the climate and nature crises) states “when considering all
development proposals significant weight will be given to the global climate and nature
crises”. 
6.54 NPF4 Policy 2 (Climate mitigation and adaptation) requires developments to be designed to
minimise greenhouse gas emissions and to be adaptable to future risks of climate change. 
6.55 LDP Policy 1 (Placemaking) states development should be planned and designed with
reference to climate change, mitigation and adaptation. 
6.56 A Low and Zero Carbon Report has been prepared by CDM Partnership to assess the
compliance of the proposal with regards to energy efficiency and assess the suitability of the
applicable Low and Zero Carbon (LZC) technologies. 
6.57 Based on an assessment of LZC technologies, air source heat pumps are proposed to be
used for the development as the preferred renewable and low carbon technology to meet the
total heating, cooling and DHW demand of the building, combined with 25m2 photovoltaic
(PV) panels to reduce the overall carbon emissions by 25.78% compared to the notional
building. 
6.58 Overall, the report demonstrates that by the installation and operation of low and zero-
carbon generating technologies, a 12.5% carbon emission reduction contribution is
achieved, which exceeds the 10% target stated in Perth and Kinross LDP. Additionally, the
proposed building accords with NPF4 Policy 1 (Tackling the climate and nature crises),
NPF4 Policy 2 (Climate mitigation and adaptation) and LDP Policy 1 (Placemaking). 
Ecology
6.59 NPF4 Policy 3 (Biodiversity) and LDP Policy 41 (Biodiversity) requires development
proposals to enhance and conserve biodiversity. It sets out that adverse impacts should be
minimised by careful planning and design. Planning Guidance (Planning and Biodiversity)
sets out the key biodiversity issues and opportunities that should be considered within new
developments. 
6.60 An Ecological Appraisal has been prepared by Encon Associates to accompany the planning
application. 
6.61 The report recommends mitigation measures to prevent any potential adverse impacts on
ecology. This includes implementing a wildlife friendly lighting design to minimise the
effects on nocturnal wildlife, particularly bats. The report also outlines that in order to
prevent trapping amphibians in drains on the site, 45-degree angled kerbs should be used

Page 37

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 26 
throughout the development. Where this is not possible, recessed wildlife kerbs should be
installed adjacent to all gully pots/drains. 
6.62 There are also opportunities to enhance the ecological value of the site post-development,
through planting trees, shrubs, hedgerows and wildflower grassland which will benefit
pollinators, birds and other urban wildlife. 
6.63 Overall, the report concludes that provided all the mitigation measures recommended
within the Ecological Appraisal are implemented, the proposals would comply with NPF4
Policy 3 (Biodiversity); LDP Policy 41 (Biodiversity) and LDP Planning Guidance (Planning
and Biodiversity).  
Flood risk and drainage
6.64 NPF4 Policy 22 (Flood risk and water management) part (c) states that development
proposals must not increase the risk of surface water and should manage all rain and
surface water through sustainable urban drainage systems. This is also set out in LDP
Policy 53C (Surface water drainage). 
6.65 A Flood Risk Screening and Drainage Impact Assessment has been prepared by Glanville
Consultants which proposes an outline drainage strategy for the development. A Drainage
Maintenance Plan also accompanies the planning application. 
6.66 It is concluded that flood risks within the site are minimal and that the proposed design
ensures that flood risks are not increased by the development. 
6.67 The proposed surface water drainage strategy follows sustainable drainage guidance. The
report identifies that infiltration is suitable and that all surface water will be collected
within a permeable sub-base under the permeable car park surfacing via diffuser boxes.
Rainfall will be collected from the main car park /patio by permeable paving and will be
attenuated within the permeable sub-base with rainwater falling on the drive thru lane
being collected by an adjacent Bio-Retention strip. The permeable pavement sub-base will
then discharge to a detention basin before ultimately being discharged into the nearby
watercourse.
6.68 The sustainable surface water drainage system is designed to accommodate a 1:200-year
event plus the appropriate climate change allowance for this site, without flooding. 
6.69 The development’s foul water drainage strategy utilises gravity to take effluent to the
nearest foul sewer adjacent to the site. The design includes many access points for
maintenance and an alarmed grease trap to ensure downstream sewers are protected from
cooking waste/grease. 
6.70 The proposed development therefore complies with NPF4 Policy 22 (Flood risk and water
management) and LDP Policy 53C (Surface Water Drainage). 
Summary 
6.71 In summary, it is essential that planning balance is applied to the decision on the proposed
drive-thru development at Blairgowrie. The decision should be made on the individual facts
and circumstances of the case and consideration must be given to the wider policies of the
development plan, including both Perth and Kinross LDP and NPF4. Planning judgement

Page 38

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 27 
should also be proportional and reasonable, so should not be based on compliance with one
policy alone. 
6.72 The application proposals are considered to accord with the relevant policies within the
adopted plan when read as a whole. The site lies in a commercial area, which is surrounded
by established retail/drive-thru uses. It is therefore considered that the proposed
development is compatible with nearby commercial uses and indeed would complement the
retail function of the park, resulting in linked trips. 
6.73 It is therefore considered that the principle of the proposed development is acceptable
given the absence of any significant technical or amenity conflicts, alongside its location
adjacent to existing commercial uses, as well as the range of socio-economic benefits the
development would deliver.

Page 39

Proposed drive-thru restaurant  : Land at Perth Road, Blairgowrie 
Pg 28 
7.0 Conclusions
7.1 This Planning Statement has been prepared by Lichfields on behalf of McDonald’s
Restaurants Limited. It accompanies a planning application in relation to the development
of land at Perth Road, Blairgowrie for the following: 
‘Erection of drive-thru restaurant (Class 3/Sui Generis) with associated access, servicing,
car parking, landscaping and other associated works and infrastructure’. 
7.2 This Statement has assessed the application against the Statutory Development Plan, as
well as other material considerations. 
7.3 The application site comprises vacant land to the west of Perth Road which is allocated for
mixed-use development in the LDP. The site is located adjacent to an established retail
park, and therefore the proposals will be seen in the context of the surrounding uses and
will fit in with the character of the area. 
7.4 A comprehensive Town Centre First Assessment has been undertaken, and no suitable
sequentially preferable sites have been identified. 
7.5 The planning application also confirms that there will be no adverse impact in terms of
odour or traffic as a result of the proposed development. Furthermore, it is not considered
that there is any aspect of the proposal that would impact negatively on health and no
evidence that the development would give rise to significant adverse effects on health and
wellbeing. This is particularly the case given McDonald’s ongoing responsible approach to
offering balanced options and promoting active lifestyles. 
7.6 In the context of the above, the proposed development is considered to accord with the
relevant policies within the adopted Development Plan, when read as a whole. In particular,
it is considered that the principle of the proposed development is acceptable given the
planning history of the site and given its proximity to existing commercial uses, as well as
the range of socio-economic benefits the development would deliver. 
7.7 In this regard, the scheme will result in a series of economic benefits for the area including: 
• Supporting 140 direct FTE construction jobs, as well as supporting a further 120
indirect and induced FTE jobs during the construction phase;
• Generating an additional £4.1 million of GVA during construction;
• Creating 80-100 direct headcount jobs (55-75 direct FTE jobs) on-site once the
development is completed and operational – and a further 30 indirect and induced
jobs; and
• Delivering an uplift in business rates revenue in the range of £39,000 to £42,500.
7.8 In overall summary, the proposals will provide a high-quality development on a vacant site
adjacent to Westpark Retail Park, Blairgowrie, and secure significant economic benefits for
the local area. The application scheme is in accordance with the Development Plan when
considered as a whole and Planning Permission should be granted without delay.

Page 40

No embedded text on this page.

Page 41

No embedded text on this page.

Page 42

Land West of Perth Road,
Blairgowrie
Economic Statement  
McDonald's Restaurants Ltd
24 July 2025

Page 43

© 2023 Nathaniel Lichfield & Partners Limited (trading as “Lichfields”), All Rights Reserved, is registered in England, no. 2778116.
Registered office at The Minster Building, 21 Mincing Lane, London EC3R 7AG.
Formatted for double sided printing.
Plans based upon Ordnance Survey mapping with the permission of His Majesty’s Stationery Office.
© Crown Copyright reserved. Licence number 10007707
67496/01/JW/JRob
33074024v2

Page 44

Land West of Perth Road, Blairgowrie : Economic Statement 
Contents
1.0 Introduction 1
Proposed Development 1
Structure 1
2.0 Approach to Site Selection 2
McDonald’s Store Format 2
Site Selection Process 3
Stage 2: Site Comparators 6
3.0 Socio-Economic Impact of Development 8
Construction Impacts 8
Operational Impacts 9
Environmental Impacts 11
Community Benefits 11
4.0 Summary 13

Page 45

Land West of Perth Road, Blairgowrie : Economic Statement 
Pg 1 
1.0 Introduction
1.1 This Economic Statement has been prepared by Lichfields on behalf of McDonald’s
Restaurants Ltd (‘McDonald’s’).  It accompanies a full planning application in relation to
development on land west of Perth Road, Blairgowrie. The site is located within the Perth
and Kinross local authority area.
1.2 This Statement provides an overview of the process and key criteria applied by McDonald’s
in identifying the application site as a commercial opportunity.  In addition, it outlines the
potential socio-economic impacts that could be unlocked as a result of the scheme’s
delivery.
Proposed Development
1.3 The accompanying planning application seeks permission for the erection of a Drive Thru
restaurant (Class 3/Sui Generis) to be operated by McDonald’s, with associated access,
servicing, car parking, landscaping and other associated works. It is understood that the
restaurant will have a Gross External Area (GEA) of 315 sq.m.
Structure
1.4 The remaining sections of the report are structured as follows: 
• Section 2.0: provides an overview of the site selection process adopted by McDonald’s
in assessing the commercial viability of the application site; 
• Section 3.o: outlines the key socio-economic impacts that could be unlocked by the
delivery of the application site – during both the construction and operational phases;
and 
• Section 4.0: summarises the key messages from the preceding sections of the
document.

Page 46

Land West of Perth Road, Blairgowrie : Economic Statement 
Pg 2 
2.0 Approach to Site Selection
2.1 McDonald’s has a well-established methodology for selecting locations for its proposed
restaurants. This section outlines the site selection process, and the factors used to assess
the likely viability of the site.
McDonald’s Store Format
2.2 The McDonald’s brand is globally recognised and has been trading in the UK since 1974. 
The company currently trades from more than 1,400 restaurants across the UK and directly
employs more than 170,000 people.
2.3 The 2024 McDonald’s at 50: Our social and economic impact1 report highlights the
economic contribution of McDonald’s operations at national and regional levels. In 2023,
McDonald’s sites across Scotland contributed £457 million to the national economy and
supported 15,425 jobs. This included:
• 13,360 direct jobs within the 114 restaurants in the country;
• 325 indirect jobs in the supply chain; 
• 1,735 induced jobs within the wider economy; and 
• Spending £42.9 million in 2023 with suppliers based in Scotland. 
2.4 Almost 90% of McDonald’s restaurants are operated as local businesses by franchisees. 
This approach unlocks the opportunity for local investors to leverage the global marketing
and branding of McDonald’s, as well as benefitting from comprehensive training
programmes and well-established supply chains. As a result, the development of a new
McDonald’s restaurant offers the potential for immediate growth and a lower risk of failure
compared to an alternative independent start-up. As such, the anticipated employment
opportunities supported by the proposals (see Section 3.0) are arguably more secure than
those supported by an independent alternative. 
2.5 The business’ network of restaurants in the UK includes four principal formats, as
summarised below:
• High Street;
• Drive Thru;
• Drive To; and 
• Delivery Kitchen.
2.6 The most prevalent formats are Drive Thru and High Street, which account for
approximately 1,000 sites and 400 sites respectively. The application site has been
identified as a suitable location for a Drive Thru restaurant. 
1 McDonald's at 50: Our social and economic impact (2024)

Page 47

Land West of Perth Road, Blairgowrie : Economic Statement 
Pg 3 
Site Selection Process
2.7 Potential sites are identified through a number of sources, including McDonald’s retained
commercial property agents and external referrals.  Locations are then assessed using a
two-stage process, as outlined below:  
• Stage 1: potential sites are assessed using McDonald’s bespoke analytical model.  This
is used to determine whether sites are likely to represent suitable locations for
investment; and
• Stage 2: for sites which progress from Stage 1, further analysis is conducted to
determine the likely strength of their future trading performance.  This assessment
draws upon a review of comparable sites within McDonald’s existing portfolio of assets.
Stage 1: Initial Modelling
2.8 The analytical model used at Stage 1 is proprietary to McDonald’s.  Details of the modelling
approach are therefore commercially sensitive and cannot be disclosed in full. The
modelling framework is dynamic.  As such, it recognises that interdependencies exist
between key metrics and influence the importance of each. The anticipated role and market
position of a site can also impact upon the relative importance of key metrics. The list of
criteria, therefore – and the threshold values which must be met for a site to be considered
viable – may vary according to the type of site to be delivered.  
2.9 McDonald’s expect the application site to serve the needs of Blairgowrie, Rattray and the
surrounding catchment a market where McDonald’s does not have a present currently – as
well as providing an alternative food and beverage option for retail customers at Westpark
Retail Park.
2.10 Westpark Retail Park forms part of the wider Westpark Masterplan area which is a mixed-
use development opportunity which includes plans to deliver a range of uses, including
residential units, a care home facility, a hotel, as well as retail and commercial space. 
2.11 In recognition of this, the issues assessed within McDonald’s analytical model are as
follows: 
1 Proximity to existing network of McDonald’s restaurants;  
2 Local population;
3 Proximity to destination retail; and
4 Anticipated volume of traffic flows.
2.12 The following paragraphs provide an overview of each of the factors listed above and how
the application site performs against them. It can be seen from the bulleted list above, that
the model does not consider local representation of McDonald’s competitors.  It is
understood, however, based upon discussions with McDonald’s that:
• Competition is not considered to have a significant impact on trading levels of
McDonald’s stores; and 
• Where competition does exert some influence on trading, this can often be positive,
with greater range and choice making a destination more attractive and encouraging
more customers to stop/visit.

Page 48

Land West of Perth Road, Blairgowrie : Economic Statement 
Pg 4 
Existing Network of Restaurants
2.13 In considering a site’s relationship to McDonald’s existing portfolio of restaurants, the
analytical model generally seeks to maximise the distance between locations. This helps to
ensure that new developments are positioned to serve new (or less well penetrated)
catchment areas.
2.14 The distance considered acceptable by the analytical model can vary according to other
factors (local population, traffic flows, proximity to anchor attractions etc.). For instance,
the threshold for roadside sites located on the same travel route is typically 10km. In
contrast, the threshold can fall to 1km in more densely populated areas. In deriving the list
of nearby sites, the analytical model considers the impacts of Drive To and Drive Thru
formats to be comparable. 
2.15 The closest McDonald’s restaurants to the application site that are listed below. 
• Dunkeld Road, Perth (20.1km) – the site is situated along Dunkeld Road (A912) in
Perth. The restaurant is located adjacent to an Asda Superstore and surrounded by
residential development to the north of Perth town centre. As such it, serves a different
market to that being targeted by the application site; and 
• Camperdown Leisure Park, Dundee (22.7 km) – the site is situated at the
Camperdown Leisure Park adjacent to the A90. Occupiers of the Leisure Park include
Cineworld, the Weaver Mill public house, and Premier Inn. It also includes the Dundee
Ice Arena (home to the Dundee Stars ice hockey team).  The site predominantly serves
customers visiting the Leisure Park, as well as road users along the A90 – a key East-
West route linking Perth and Dundee. The market served by the site is therefore
different to that being targeted by the proposed development; and
• Broxden Interchange, Perth (22.9km) – the site is situated at the Broxden
Interchange, which is located near to the M90 and A93, on the western edge of Perth
near the Perth Park and Ride and Broxden Business Park, as well as a large area of
existing residential communities to the west of Perth town centre. The restaurant serves
a different market to that being targeted by the application site.
2.16 It is clear, therefore, that there are no existing McDonald’s within 20km of the application
site. The proposed development on land West of Perth Road therefore provides an
opportunity for McDonald’s to establish a presence in an area where the business is not
currently represented. It therefore meets the requirements of the analytical model with
respect to its proximity to the existing network of restaurants.  
Local Resident Population
2.17 McDonald’s recognise that every site is unique in terms of revenue generators and that the
level of influence and the importance of each fluctuates. McDonald’s advise that the
proposed restaurant is expected to serve Blairgowrie, Rattray and the surrounding
communities. As outlined above, the area is currently unserved by McDonald’s with the
nearest restaurant located more than 20km away. The market population currently stands
at 8,300 residents.
2.18 In addition, the site is expected to serve an 8-minute (non-overlapping) drive time
catchment with a population of 10,900. McDonald’s consider this to be acceptable for this

Page 49

Land West of Perth Road, Blairgowrie : Economic Statement 
Pg 5 
site, reflecting the strength of demand supported by other key drivers (most notably
McDonald’s current lack of representation in the market area). As outlined in paragraph
2.10, the application site is situated in the wider Westpark masterplan area which has
outline approval to deliver up to 400 new homes. Future housing developments are
excluded from the population figures referred to previously. However, McDonald’s advise
that this planned growth (in close proximity to the application site) has formed part of the
company’s decision-making process and will help to underpin the site’s long-term viability. 
Proximity to Destination Retail
2.19 The application site forms part of Westpark Retail Park, a local retail park comprising of
c.38,600 sq.ft of retail floorspace. The retail park is currently home to Lidl and Home
Bargains and forms part of the wider 24.6ha Westpark development, a mixed-use scheme
which forms part of the Local Development Plan (LDP2) where future phases of
development are expected to include small scale retail/commercial and a hotel.
McDonald’s advise that the strength and profile of the retail offer in the immediate vicinity
of the application site will be a key driver of demand. It is anticipated that a proportion of
sales at the restaurant will be attributable to people shopping at Westpark Retail Park.
Indeed, McDonald’s analysis of Visa transactions indicates that, on average 14%, of Drive
Thru/Drive To sales are generated by retail-related custom (i.e. engaged in a transaction at
a retail unit within 500m of a restaurant prior to their visit).
Traffic Flows
2.20 The Department for Transport (DfT) records data regarding traffic flows based on Average
Annual Daily Flow (AADF). The McDonald’s model uses a hybrid dataset, which
triangulates data from DfT, TomTom and mobile phone activity. This provides estimates of
AADF across the entire road network, with the data for the application site shown in Figure
2.1.

Page 50

Land West of Perth Road, Blairgowrie : Economic Statement 
Pg 6 
Figure 2.1 Traffic Flow Data, Proposed Blairgowrie Site 
Source: 2018, 2023 Precisely. © 2006-2022 TomTom. All rights reserved
2.21 The McDonald’s model suggests that the application site currently achieves an AADF of
6,400. This reflects the location of the site, situated on Perth Road (A93) which is a major
A-road. Spanning over 100 miles, the road runs north-south, connecting Perth to
Blairgowrie and Braemar, in the Cairngorms, before routing east along the River Dee to
Aberdeen.
2.22 Given the strength of the other, principal, drivers of demand, McDonald’s has advised that
this level of traffic flow is considered to be sufficient to support a viable restaurant –
particularly given the strategic nature of the A93 route.
Stage 2: Site Comparators
2.23 Based upon the Stage 1 analysis, the application site was identified as a potentially strong
location for a Drive Thru restaurant. This reflects the size of the local population catchment,
McDonald’s lack of representation in the local area, and sites’ proximity to Westpark Retail
Park.
2.24 Stage 2 of the McDonald’s assessment process generates a modelled sales estimate for sites
which progress beyond Stage 1.  This is used to determine the likely commercial viability of
a site and draws principally upon an analysis of similar existing McDonald’s locations.  It is
understood that the sales forecasts for the application site were developed using
comparator locations, having regard to the following criteria:
• Proximity to McDonald’s existing portfolio of restaurants; 
• Market/population size; 
• Proximity to retail provision; and
• Traffic flows.

Page 51

Land West of Perth Road, Blairgowrie : Economic Statement 
Pg 7 
2.25 The estimated sales figures for any site assessed at Stage 2 are an aggregate of three
individual sales estimates.  This approach is intended to reflect the core customer markets
served by McDonald’s across all formats: 
• Retail-related sales: which take account of the size and strength of an area’s retail
draw and the potential of this to drive custom;
• Residential and delivery sales: which reflect the size of the residential catchment
within an 8-minute radius (as well as the relationship to existing locations in the area);
and
• Transient custom: this is based on passing  trade influenced by proximity to the
strategic road network, volume of traffic flows and distance to the nearest Drive
Thru/To.
2.26 McDonald’s assessment has identified the proposed restaurant at on land West of Perth
Road as being commercially viable. 
2.27 When combined with the factors outlined in preceding paragraphs, it is clear that
McDonald’s has been through a comprehensive site assessment process and that this
exercise has identified the application site as a good commercial opportunity.

Page 52

Land West of Perth Road, Blairgowrie : Economic Statement 
Pg 8 
3.0 Socio-Economic Impact of Development
3.1 This section sets out the potential socio-economic impacts associated with the proposed
development. The key impacts relate to the new employment opportunities and additional
economic output that could be generated by the proposals (during both construction and
operation). The environmental and wider community impacts associated with the scheme
are also considered.
Construction Impacts
Direct Employment
3.2 The total construction cost for the development is estimated to be in the order of £2.6
million, with figures provided to Lichfields by McDonald’s.
3.3 Using labour coefficients from the HCA Calculating Cost per Job Best Practice Note (2015),
it is possible to estimate the number of direct construction jobs that could be supported by
the proposed development over the course of the construction phase. Taking account of the
nature of the proposals, a ‘private commercial’ coefficient is considered as the most
appropriate for estimating the number of direct construction jobs. This coefficient assumes
that 16.6 direct Full-Time Equivalent (‘FTE’) jobs will be supported over a 12-month period
for every £1 million of construction value (in 2011 prices).
3.4 To use the coefficient, the construction cost of £2.6 million has been deflated from 2024 to
2011 prices using UK Government GDP deflator data (2023). Applying the private
commercial coefficient to the deflated construction cost of £1.9 million and then dividing
the result by the length of the construction period (12 weeks or 0.23 years), indicates that
the proposed development could be expected to support 140 gross direct FTE jobs during
the construction phase.
Indirect and Induced Employment
3.5 The construction of commercial property involves purchases from a range of suppliers, who
in turn purchase from their own suppliers further down the supply chain. The relationship
between the initial direct expenditure and total economic impacts is referred to as the
‘multiplier effect’ and demonstrates that an initial investment can have considerably larger
economic benefits as this expenditure is transmitted through the economy. 
3.6 As a result, it is anticipated that some businesses in the local and regional economy would
benefit from trade linkages established during the construction of the scheme.
Consequently, a number of indirect jobs would be supported through the supply of
construction materials and equipment.
3.7 In addition, local businesses would generally be expected to benefit from a temporary
increase in demand as a result of expenditure by direct and indirect workers during
construction. This could be expected to include wage spending of workers in hotels, shops,
bars, restaurants and other services and facilities. This helps to support further induced
jobs.

Page 53

Land West of Perth Road, Blairgowrie : Economic Statement 
Pg 9 
3.8 Scottish Government Input Output Tables indicate that the construction industry has an
indirect and induced employment multiplier of 1.862. Applying this multiplier to the 140
direct FTE construction jobs derived above suggests that a further 120 FTE indirect and
induced jobs could be supported through the construction phase. In total, therefore, the
proposed development could be expected to support 260 direct, indirect, and induced FTE
jobs during the construction phase.
Economic Output
3.9 The development proposals would also contribute to local economic output, as measured in
terms of Gross Value Added (GVA) during the construction phase. GVA is a measure of the
difference between what is produced as output (goods and services) and the inputs (raw
materials, semi-finished products etc.) used in the production of the output. It represents
the additional value that is added through economic activity. In measuring economic
growth, economists typically have regard to the quarterly (or annual) change in GVA for a
given area.
3.10 It is estimated that the scheme could be expected to deliver an additional £4.1 million of
GVA during the construction phase. This estimate has been derived having regard to:
• The level of direct employment to be supported during construction;
• Average GVA per construction worker for Scotland3; and 
• An appropriate GVA multiplier for the construction industry4. 
Operational Impacts
Direct Employment
3.11 It is estimated that the proposed development could support the creation of 80-100 gross
direct headcount jobs, once completed and operational. This could be expected to
correspond to approximately 55-75 gross direct FTE jobs. The headcount employment
estimates have been provided by McDonald’s having regard to the company’s business
model for the application site. Headcount jobs have been converted into FTE jobs by
Lichfields, drawing upon analysis of  employment data for a sample of almost 900
McDonald’s restaurants across the UK.
Indirect and Induced Employment
3.12 In addition to the direct jobs considered above, some indirect employment would also be
created by the additional spending on goods and services by a new McDonald’s restaurant
at the application site. The wage expenditure of workers directly employed, as well as those
employed in local businesses supplying the restaurant, could also support induced jobs in
shops, services, and other businesses in the local economy. 
2 Scottish Government Input Output Tables (2022) (data for the latest available year (2019); an employment multiplier of 1.86
implies that for every 1 direct job generated, a further 0.86 indirect and induced jobs would be supported in the supply chain.
3 Experian, June 2023
4 Scottish Government Input Output Tables (2022) (data for the latest available year (2019)) – estimated to be 1.76

Page 54

Land West of Perth Road, Blairgowrie : Economic Statement 
Pg 10 
3.13 Having regard to appropriate local and regional multipliers5, it is estimated that the 55-75
direct FTE jobs created by the proposed development could support the creation of 20-30
‘spin-off’ FTE jobs in the local economy. At the Scottish level, in the order of 30-40 ‘spin-
off’ FTE jobs are estimated to be supported, which includes the 20-30 to be captured
locally.
3.14 In total, therefore, the proposed development could support in the order of 85-115 FTE jobs
(accounting for direct, indirect, and induced impacts) across Scotland, including 75-105 in
Perth and Kinross. 
Economic Output
3.15 The direct operational employment generated by the proposed development is likely to
result in an increase in Gross Value Added.
3.16 It is estimated that the gross additional direct employment to be created could generate
additional Gross Value Added in the order of £1.8-2.2 million per annum. This estimate has
been derived having regard to:
• The level of gross direct headcount employment created by the proposals (80-100 jobs);
and
• The average direct Gross Value Added per headcount job for McDonald’s staff within
Scotland6.
Fiscal Impacts
3.17 It is expected that the proposed development could also support an uplift in business rates,
which would be retained by Perth and Kinross Council. This would help to support the
delivery of local services. 
3.18 It is estimated that the proposed development could generate additional business rates in
the order of £39,000 to £42,000 per annum. This has been estimated having regard to: 
• The average Rateable Value per m2 for other McDonald’s restaurants in Perth and
Kinross7;
• The quantum of floorspace proposed at the application site (374 sq.m, GEA or 292
GIA); and 
• The Intermediate Scottish Business Rates Multiplier (0.545). 
3.19 Given the small local sample size, this Rateable Value has been sense-checked by applying
the mean average Rateable Value (and associated Business Rates payments) from a wider
sample of 29 McDonald’s restaurants across Scotland. The business rate estimate using the
wider sample data results in a business rates payable estimate of c.£39,000 and helps to
verify the local level assessment (c.£42,000).     
5 HCA Additionality Guide, Fourth Edition 2014 – ‘Recreation’ multiplier: 1.38 local; 1.56 regional
6 McDonald's at 50: Our social and economic impact (2024); £22,320 of direct GVA per headcount job 
7 Review of Scottish Assessors business rates assessments for Broxden Interchange; and Dunkeld Road McDonald’s

Page 55

Land West of Perth Road, Blairgowrie : Economic Statement 
Pg 11 
Environmental Impacts
3.20 The scale of McDonald’s operations presents an opportunity to have a positive impact on
some of the biggest challenges facing the world today. The threat of climate change is one
such challenge and McDonald’s are proud of the investment they have made to reduce their
carbon footprint in the UK.
3.21 McDonald’s was the first restaurant chain to set science-based greenhouse gas reduction
targets at a global level. Working with all franchisees, their aim is to achieve net zero
emissions across all restaurants and offices by 2030, as well as net zero across the entire
business and value chain by 2040.
3.22 To meet these targets, McDonald’s as an organisation operate the following initiatives to
promote environmental good practice: 
• Purchase 100% renewable electricity for all restaurants owned and operated by the
business; 
• Cooking oil from restaurants is recycled into biodiesel using local collectors. The
biodiesel is then used as fuel for McDonald’s vehicles. In 2023, this helped to reduce
carbon emissions by 16,250 tonnes;
• In the UK in 2023, 97.5% of customer packaging was designed to be recyclable or
compostable; and
• Customer recycling stations are installed in all new restaurants, to encourage customers
to dispose of their food packaging responsibly.
Community Benefits
3.23 In addition to the above, McDonald’s as an organisation is committed to operating as a
valued and responsible member of the communities in which it operates. This is supported
by a range of activity including:
1 Delivering strong staff training programmes –McDonald’s invested more than
£62 million in training in 2023. Approximately two-thirds of McDonald’s employees
are aged between 16-25 and for many a job at McDonald’s is the first step in their
career. This highlights the importance of a strong training programme to enhance the
development and work experience of school leavers and young people.
2 Encouraging young people to lead more active lives – McDonald’s has a long
tradition of supporting community football, providing financial support to grow and
improve standards in grassroots football across England, Scotland, Wales and
Northern Ireland. McDonald’s most recent initiative, the Fun Football programme, was
launched in 2019. It is the UK’s largest grassroots participation programme for
children aged 5-11. By 2026, the programme aims to deliver:  
a Access to free football coaching for more than a million children; and 
b Diversity, Equity and Inclusion training to over 800 grassroots coaches.
3 Supporting charities – McDonald’s operates its own independently registered
charity, Ronald McDonald House Charities UK, which helps support families with sick
children in hospital.  In 2023, franchisees, suppliers and customers raised £10.3

Page 56

Land West of Perth Road, Blairgowrie : Economic Statement 
Pg 12 
million for RMHC, which supported 8,415 families across the UK. In addition,
McDonald’s franchisees donated a further £4.5 million in 2023 to support a range of
local initiatives.

Page 57

Land West of Perth Road, Blairgowrie : Economic Statement 
Pg 13 
4.0 Summary
4.1 The proposed development will deliver a McDonald’s Drive Thru restaurant on land west of
Perth Road, Blairgowrie. The application site has been identified – using McDonald’s
bespoke analytical model – as a location with strong commercial potential.
4.2 The analytical model has had regard to the following criteria:
• Proximity to existing network of McDonald’s restaurants; 
• Local resident population within an 8-minute drive time;
• Proximity to destination retail; and 
• Anticipated volume of traffic flows.
4.3 Modelled estimates for the site have also been produced, drawing upon analysis of
comparable McDonald’s locations. The exercise has confirmed the commercial potential of
the site.
4.4 In addition to the commercial opportunity presented by the site, it also offers the
opportunity to generate the following economic impacts:
• Support 140 direct FTE construction jobs, as well as supporting a further 120 indirect
and induced FTE jobs during the construction phase;
• Generate an additional £4.1 million of GVA during construction;
• Create in the order of 80-100 direct headcount jobs (55-75 direct FTE jobs) on-site once
the development is completed and operational – and a further 30-40 indirect and
induced jobs across Scotland; and
• Deliver an uplift in business rates revenue of between £39,000 to £42,000 per annum. 
4.5 The development will, therefore, deliver a number of economic benefits which should be
taken into account, and given weight, in the determination of the subject planning
application.

Page 58

No embedded text on this page.

Page 59

No embedded text on this page.

Page 60

REPORT NO 55002-001 
PROPOSED MCDONALD’S   
DRIVE THRU                          
PERTH ROAD, BLAIRGOWRIE 
TRANSPORT ASSESSMENT 
JUNE 2025

Page 61

Planning Issue
Project no: 55002
Date: June 2025 
Andrew Moseley Associates
15 St Paul’s Street 
Leeds, LS1 2JG 
www.amatp.co.uk 
info@amatp.co.uk 
PROPOSED MCDONALD’S   
DRIVE THRU                          
PERTH ROAD, BLAIRGOWRIE
TRANSPORT ASSESSMENT 
MCDONALD’S RESTAURANTS LTD

Page 62

QUALITY MANAGEMENT 
First Issue Revision 1 Revision 2 Revision 3
Remarks Final Issue   
Date 13.06.25   
Prepared EP   
Checked JH   
Authorised AM   
PRODUCTION TEAM
AMA 
Associate Alex McGarrell
Principal Transport Planner Jonathan Hazell
Graduate Transport Planner  Emma Pavlin

Page 63

Transport Assessment Page | i Project No 55002
Perth Road, Blairgowrie June 2025 
TABLE OF CONTENTS 
1 INTRODUCTION ................................................................................................................... 1
1.1 OVERVIEW ................................................................................................................... 1
1.2 REPORT STRUCTURE ................................................................................................ 1
2 POLICY BACKGROUND ...................................................................................................... 2
2.1 NATIONAL PLANNING FRAMEWORK ................................................................ 2
2.2 PLANNING ADVICE NOTE 75 (PLANNING FOR TRANSPORT) .................... 3
2.3 TRANSPORT ASSESSMENT GUIDANCE .............................................................. 4
2.4 LOCAL POLICY ............................................................................................................ 5
3 EXISTING CONDITIONS ..................................................................................................... 8
3.1 SITE LOCATION .......................................................................................................... 8
3.2 LOCAL ROAD NETWORK ........................................................................................ 8
3.3 TRAFFIC BASE FLOWS ............................................................................................. 8
3.4 PERSONAL INJURY COLLISION ............................................................................. 9
4 EXISTING SUSTAINABLE TRANSPORT PROVISION ................................................ 10
4.1 INTRODUCTION ....................................................................................................... 10
4.2 WALKING ACCESSIBILITY ..................................................................................... 10
4.3 CYCLING ACCESSIBILITY ....................................................................................... 10
4.4 PUBLIC TRANSPORT ............................................................................................... 11
4.5 SUMMARY .................................................................................................................. 11
5 DEVELOPMENT PROPOSALS ......................................................................................... 12
5.1 DEVELOPMENT PROPOSALS AND SITE LAYOUT ......................................... 12
5.2 PROPOSED ACCESS ................................................................................................ 12
5.3 SERVICING ARRANGEMENTS .............................................................................. 12
5.4 PARKING ..................................................................................................................... 13

Page 64

Transport Assessment Page | ii Project No 55002
Perth Road, Blairgowrie June 2025 
5.5 DRIVE-THRU LANE OPERATION ......................................................................... 14
6 ASSESSMENT PARAMETERS ........................................................................................... 15
6.1 INTRODUCTION ....................................................................................................... 15
6.2 ASSESSMENT YEARS ............................................................................................... 15
6.3 FUTURE YEAR ASSESSMENT SCENARIOS ....................................................... 15
6.4 TRAFFIC GROWTH .................................................................................................. 15
6.5 COMMITTED DEVELOPMENTS ........................................................................... 15
6.6 DEVELOPMENT TRAFFIC GENERATION .......................................................... 16
6.7 McDonalds Trips by Type ........................................................................................ 17
6.8 DEVELOPMENT TRAFFIC DISTRIBUTION AND ASSIGNMENT ................. 20
6.9 PARKING DEMAND ................................................................................................. 20
6.10 DRIVE-THRU QUEUE .............................................................................................. 20
6.11 SUMMARY .................................................................................................................. 21
7 FUTURE DEVELOPMENT IMPACTS .............................................................................. 22
7.1 INTRODUCTION ....................................................................................................... 22
7.2 ACCESS ROAD / A93 ............................................................................................... 22
7.3 SUMMARY .................................................................................................................. 23
8 SUMMARY ............................................................................................................................ 24
APPENDICES ................................................................................................................................ 26

Page 65

Transport Assessment Page | iii Project No 55002
Perth Road, Blairgowrie June 2025 
FIGURES
Figure 1 – Indicative Site Location Plan
Figure 2 – 2km Walking Isochrone
Figure 3 – Public Rights of Way Map
Figure 4 – 5km Cycling Isochrone
Figure 5 – Bus Stop Location Plan
Figure 6 – 2024 Survey Flows
Figure 7 – 2029 Traffic Flows
Figure 8 – Development Flows
Figure 9 – Committed Development Flows 
Figure 10 – Additional Trip Distribution (%)
Figure 11 – 2029 Do Something Flows
APPENDICES
Appendix A – Proposed Site Layout
Appendix B – Swept Path Analysis
Appendix C – Site Access Junction and Visibility Splay
Appendix D – TRICS Outputs
Appendix E – Capacity Modelling Outputs

Page 66

Transport Assessment Page | 1 Project No 55002
Perth Road, Blairgowrie June 2025 
1 INTRODUCTION
1.1 OVERVIEW
1.1.1 Andrew Moseley Associates (AMA) has been commissioned by McDonald’s Restaurants Ltd to
prepare a Transport Assessment (TA) and Interim Travel Plan (ITP) to accompany a planning
application for the development of a McDonald’s restaurant with a drive-thru off the A93 Perth Road
in Blairgowrie.
1.1.2 The proposed site is located approximately 1.4km south of the centre of Blairgowrie and would form
part of the wider West Park Retail Park. Currently the site comprises undeveloped land which is
bound to the north and west by further undeveloped land, to the east by the A93 Perth Road, and to
the south by an unnamed access road associated with the retail park. The location of the site is
illustrated indicatively at Figure 1.
1.1.3 The Local Planning Authority (LPA) and the Local Roads Authority is Perth and Kinross Council (PKC). 
1.1.4 This TA has been prepared with reference to The National Planning Framework 4 (NPF4), Scottish
Transport Assessment Guidance (2012) and Perth and Kinross Council Local Development Plan 2
(LDP2).
1.1.5 This TA will demonstrate that the site is well served by existing transport provision and is accessible
to a large residential catchment. The report will also demonstrate that the traffic generated by the
proposals will not result in a detrimental impact on the surrounding road network.
1.1.6 An ITP has also been prepared which sets out measures to encourage sustainable travel patterns and
reduce the reliance on private car use. 
1.2 REPORT STRUCTURE
1.2.1 The structure of the report is set out as follows:
 Section 2 – outlines the policy background at a national and local level;
 Section 3 – provides a description of the road network surrounding the site, details of the
existing traffic flows and a review of the personal injury collision records;
 Section 4 – examines the accessibility of the site by sustainable modes of travel;
 Section 5 – describes the development proposals, including the proposed quantum of
development, means of access and parking provision;
 Section 6 – summarises the assessment parameters and trips rates that have been adopted
within this TA;
 Section 7 – examines the impact of development traffic on the local road network; and
 Section 8 – provides a summary of the TA.

Page 67

Transport Assessment Page | 2 Project No 55002
Perth Road, Blairgowrie June 2025 
2 POLICY BACKGROUND
2.1 NATIONAL PLANNING FRAMEWORK
2.1.1 The ‘National Planning Framework’ (NPF) 4 sets out the Scottish Governments spatial principles,
regional priorities, national developments and national planning policy for the next 20 to 30 years.
The document was published in February 2023 and replaces the NPF3 as well as the Scottish Planning
Policy documents. 
2.1.2 The NPF4 provides a vision for the planning system in Scotland, which seeks to grow the Scottish
economy simultaneous of reducing carbon emissions and reducing the disparities in well-being and
opportunity. Therefore, NPF4 sets out the following six overarching principles for future places and
developments; 
 Just transition. We will empower people to shape their places and ensure the transition to net
zero is fair and inclusive.
 Conserving and recycling assets. We will make productive use of existing buildings, places,
infrastructure and services, locking in carbon, minimising waste, and building a circular economy.
 Local living. We will support local liveability and improve community health and wellbeing by
ensuring people can easily access services, greenspace, learning, work and leisure locally.
 Compact urban growth. We will limit urban expansion so we can optimise the use of land to
provide services and resources, including carbon storage, flood risk management, blue and green
infrastructure and biodiversity.
 Rebalanced development. We will target development to create opportunities for communities
and investment in areas of past decline, and manage development sustainably in areas of high
demand.
 Rural revitalisation. We will encourage sustainable development in rural areas, recognising the
need to grow and support urban and rural communities together.
2.1.3 By applying these spatial principles, the national spatial strategy will broadly seek to support the
planning and delivery of:
 sustainable places, where we reduce emissions, restore and better connect biodiversity.
 liveable places, where we can all live better, healthier lives.
 productive places, where we have a greener, fairer and more inclusive wellbeing economy.
2.1.4 With specific regard to Sustainable Transport, the NPF4 sets out the intent to:
 To encourage, promote and facilitate developments that prioritise walking, wheeling, cycling and
public transport for everyday travel and reduce the need to travel unsustainably.
2.1.5 Within the targets to promote sustainable transport, the policy is seeking to achieve the following
outcomes:
 Investment in transport infrastructure supports connectivity and reflects place based approaches
and local living.
 More, better, safer and more inclusive active and sustainable travel opportunities.
 Developments are in locations which support sustainable travel.

Page 68

Transport Assessment Page | 3 Project No 55002
Perth Road, Blairgowrie June 2025 
2.1.6 NPF4 also details a number of policies that are designed to support development that helps to meet
the greenhouse gas emissions targets. These policies ranges from the minimisation of new emissions,
protection of biodiversity, use of previously used and developed land and sustainable waste
management. Of these policies, Policy 13 specifically relates to the transition towards more
sustainable, lower emissions travel including active travel and public transport. 
2.1.7 Within Policy 13, seven subsections set out the requirements for new developments. Section b sets
out:
 Development proposals will be supported where it can be demonstrated that the transport
requirements generated have been considered in line with the sustainable travel and
investment hierarchies and where appropriate they:
I. Provide direct, easy, segregated and safe links to local facilities via walking, wheeling and
cycling networks before occupation;
II. Will be accessible by public transport, ideally supporting the use of existing services;
III. Integrate transport modes;
IV. Provide low or zero-emission vehicle and cycle charging points in safe and convenient
locations, in alignment with building standards;
V. Supply safe, secure and convenient cycle parking to meet the needs of users and which
is more conveniently located than car parking;
VI. Are designed to incorporate safety measures including safe crossings for walking and
wheeling and reducing the number and speed of vehicles;
VII. Have taken into account, at the earliest stage of design, the transport needs of diverse
groups including users with protected characteristics to ensure the safety, ease and
needs of all users; and
VIII. Adequately mitigate any impact on local public access routes.
2.2 PLANNING ADVICE NOTE 75 (PLANNING FOR TRANSPORT)
2.2.1 The Planning Advice Note (PAN) sets out good practice guidance which planning authorities,
developers and others should carry out in their proposals and project delivery. The document aims to
create greater awareness of how linkages between planning and transport can be managed through
highlighting the roles of different bodies and professions in the planning process.
2.2.2 Within the PAN, guidance is provided specifically on Transport Assessments and Travel Plans as well
as the accessibility of development proposals. 
2.2.3 Annex B of the PAN considers Personal Accessibility Analysis (PAA) which can be affected by: 
 An individual’s own mobility;
 By the physical disposition of destinations relative to the individual;
  By the availability of means of transport;
 Or by a combination of the three
2.2.4 Within this, accessibility profiles for sites should be established which reflect the catchment area
served and the relative indicators for the accessibility of different sites. These are:
 Transport system accessibility by population sector to an opportunity:
I. A transport improvement or an increase in the number of opportunities will increase
accessibility.
II. The scale of change is not easily assessed through qualitative comparisons.
 Accessibility to public transport services:

Page 69

Transport Assessment Page | 4 Project No 55002
Perth Road, Blairgowrie June 2025 
I. This is particularly useful if public transport services can be classified accurately in terms
of their frequency or destination.
II. Obtaining detailed data on origins, destinations and routes of services can be a major
exercise.
III. For accessibility of housing to public transport the recommended guidelines are less than
400m to bus services and up to 800m to rail services.
IV. Accessibility can be categorised, for example weak or strong.
 Accessibility to local facilities by walking and cycling:
I. A maximum threshold of 1600m for walking is broadly in line with observed travel
behaviour; and
II. If there is a significant population within 800m then improvements to the quality of
walking and cycling networks will increase accessibility.
2.2.5 Annex C of the PAN considers Mode Share Targets (MSTs) that should be considered within the
Travel Plans for new developments. 
2.2.6 Annex D sets out the requirements of a Transport Assessment, with the overall objectives to
encourage sustainable travel in relation to the transport mode hierarchy. A Transport Assessment
should include the following key elements: 
 An assessment of travel characteristics;
 A description of the measures which are being adopted to influence travel impacts of the
proposal;
 A description of the transport impacts of the development in a broader context and how these
will be addressed.
2.2.7 Annex E sets out the guidance and requirements for Travel Plans. The PAN states that the content
of a travel plan should be agreed in conjunction with the Local Authority and reflect the aims and
objectives of the Council as a whole. The use of measures is to meet targets which have been derived
from the transport assessment or the Local Transport Strategy. The plan should encourage change in
a manageable way for those it is targeting. 
2.2.8 Research has also demonstrated that:
 Containing only marketing and promotion are unlikely to achieve any modal shift.
 Car-sharing and cycle measures may achieve 3-6% reduction in drive alone commuting.
2.3 TRANSPORT ASSESSMENT GUIDANCE
2.3.1 The Transport Scotland Transport Assessment Guidance is the current document that is to assist in
the preparation of Transport Assessments for development proposals in Scotland. The document sets
out requirements according to the scale of development being proposed; from a local development
which requires a simple Transport Statement providing an explanation of transport issues through to
a major development where detailed technical analyses will be required in a Transport Assessment
accompanied by a supporting Travel Plan.

Page 70

Transport Assessment Page | 5 Project No 55002
Perth Road, Blairgowrie June 2025 
2.4 LOCAL POLICY
Perth and Kinross Council Local Development Plan 2
2.4.1 Perth and Kinross Council’s second Local Development Plan (LDP2) covers all of Perth and Kinross;
it provides the planning framework and guides all future development and use of the land. It acts as
a catalyst for changes and improvement in the area and shapes the environment and economy of
Perth and Kinross. It also sets out how the council aims to work towards a vision for the area, showing
which land is being allocated to meet the area’s development needs to 2029 and beyond. The Plan
was adopted by the Council in November 2019.
2.4.2 The policies contained within the Plan that relate to transport are summarised below:
2.4.3 Policy 60B details how new development proposals that involve significant travel generation should
be well-served by, and easily accessible to all modes of transport.
2.4.4 Sustainable modes of walking, cycling and public transport should be considered, prior to private car
journeys. The aim of all development should be to reduce travel demand by car, and ensure a realistic
choice of access and travel modes is available, including opportunities for active travel and green
networks.
2.4.5 All development proposals (including small-scale proposals) should:
(a) be designed for the safety and convenience of all potential users;
(b) incorporate appropriate mitigation on-site and/or off-site, provided through developer
contributions where appropriate, which might include improvements and enhancements to the
walking/cycling network and public transport services including railway and level crossings, road
improvements and new roads;
(c) incorporate appropriate levels of parking provision not exceeding the maximum parking standards
laid out in SPP, including application of maximum on-site parking standards to help encourage and
promote a shift to the more sustainable modes of travel of walking, cycling and public transport;
(d) fit with the strategic aims and objectives of the Regional Transport Strategy and the Tay Cities
Deal;
(e) support the provision of infrastructure necessary to support positive changes in Low and Ultra
Low Emission Vehicle transport technologies, such as charging points for electric vehicles, hydrogen
refuelling facilities and car clubs, including for residential development.”
2.4.6 In certain circumstances developers may be required to:
(a) prepare and implement travel plans to support all significant travel generating developments;
(b) prepare a Transport Assessment and implement appropriate mitigation measures where required.
2.4.7 Development for significant travel generating uses in locations which would encourage reliance on
the private car will only be supported where:
(a) direct links to the core paths networks are or can be made available;
(b) access to local bus routes with an appropriate frequency of service which involve walking no more
than 400m are available;

Page 71

Transport Assessment Page | 6 Project No 55002
Perth Road, Blairgowrie June 2025
(c) it would not have a detrimental effect on the safe and efficient operation of the strategic road
and/or rail network including level crossings;
(d) the transport assessment identifies satisfactory mechanisms for meeting sustainable transport
requirements, including the implementation of a site travel plan.
2.4.8
2.4.9
2.4.10
2.4.11
2.4.12
2.4.13
2.4.14
2.4.15
Developers should include consideration of the impact of proposals on the core paths network and
local and strategic transport network.
New developments should provide access from the development to off-road walking and cycling
provision as part of the green network and contribute to its enhancement and improved connectivity.
Existing active travel routes will be safeguarded and incorporated into development. Cycle parking
facilities should be provided.
Development proposals should not exceed maximum on-site parking standards, including disabled
parking, to help encourage and promote a shift to the more sustainable modes of travel of walking,
cycling and public transport.
Section 3 of this report highlights the existing sustainable travel modes within the vicinity of the site
including regular bus services within 400m of the site on the A93 Perth Road. 
Section 5 summarises the development proposals which will include new footways and integration
with existing paths surrounding the site.
Section 7 of this report assesses the traffic associated with the development on the surrounding road
network.
Tayside and Central Scotland Regional Transport Strategy 2024 – 2034
The Regional Transport Strategy was adopted in 2024 and sets out the vision for the improving the
regions transport infrastructure and services through to 2034. 
Key outcomes to achieve the strategic objectives of the Transport Strategy are outlined below.
1. To take climate action
 Reduce estimated CO2 emissions from transport in the region
 Increase the share of EV and low emission vehicle use.
 Reduce freight mileage by road.
 Reduce car kilometres (car km) driven.
 Ensure strategic and lifeline routes (and services) are resilient to climate change, extreme weather
and emergencies.
2. To reduce inequalities
 Improve ability for young people, and disadvantaged and rural communities to access jobs,
education and services.
 Improve ability of 16-24 year olds to access jobs and further education.
 Improve ability of all in the lowest SIMD data zones (all domains), targeted by the respective
Councils, to access jobs, education and services.
 Improve ability of families, targeted in local child poverty action plans, to access jobs, education
and services.
 Improve ability of rural communities to access jobs, education and services.

Page 72

Transport Assessment Page | 7 Project No 55002
Perth Road, Blairgowrie June 2025 
 Improve the ability of over-65s, and those in lowest SIMD data zones targeted by the respective
Councils, to access social activities.
 Improve the ability of people with disabilities to access jobs, education and services. 
 Improve the safety and security of vulnerable and protected characteristic groups in the street
environment and on public transport.
3. To improve health and wellbeing
 Improve road safety for vulnerable users (pedestrians, cyclists, children and older people, lower
SIMD quintile).
 Reduce transport emissions in declared air quality management areas.
 Improve access to healthcare.
 Improve the ability of all in the lowest SIMD data zones (health domain), targeted by the
respective Councils, to access healthcare.
 Improve the ability of rural communities to access healthcare. 
 Improve the ability of over-65s to access healthcare (primary healthcare/hospitals).
 Increase the share of personal trips made by sustainable modes such as walking, wheeling, cycling
and public transport.
 Increase levels of physical activity.
 Increase the levels of walking, wheeling and cycling in the lowest SIMD data zones (health
domain), targeted by the respective Councils.
 Improve the ability to access active leisure facilities and green space for lowest SIMD data zones.
 Reduce the impact of traffic on communities on strategic routes.
4. To help deliver sustainable, inclusive economic growth
 Reliable inter-regional and intra-regional journey times. 
 Improve public transport journey times, and journey time reliability on strategic road and rail
routes. 
 Improve journey time reliability for freight through the region, and to key destinations in the
region.
 Improved ability for young people, and disadvantaged and rural communities to access jobs and
education. 
 See outcomes to reduce inequalities above.

Page 73

Transport Assessment Page | 8 Project No 55002
Perth Road, Blairgowrie June 2025 
3 EXISTING CONDITIONS
3.1 SITE LOCATION
3.1.1 The proposed site is located approximately 1.4km south of the centre of Blairgowrie and currently
comprises undeveloped land which is bound to the north and west by further undeveloped land, to
the east by the A93 Perth Road, and to the south by an unnamed access road which leads to the Wet
Park Retail Park. The location of the site is illustrated indicatively at Figure 1.
3.2 LOCAL ROAD NETWORK
Access Road
3.2.1 The unnamed access road to the south of the site is a single two-way carriageway measuring
approximately 4m in width. The road is lit and has footways on both sides of the eastern portion of
the carriageway. As part of the development proposals, the access road will be widened to 6m,
subject to LPA approval, to permit two-way movements up to and including the proposed
development. 
3.2.2 Beyond the proposed development the access road becomes one way and provides access to a small
car park and the rear of the retail park.
3.2.3 An existing junction bellmouth has been constructed to the site, this will be stopped up as part of the
proposals with a new access constructed into the site in the form of a priority junction.
A93 Perth Road
3.2.4 The A93 is a single carriageway road measuring approximately 6.5m in width. It runs in a north –
south alignment towards Blairgowrie and Rattray town centres in the north and Perth to the south.
A lit footway is provided along both sides of the carriageway which is subject to a 30mph speed limit
within the vicinity of the site, with a 20mph school zone speed limit advisory when lights are flashing. 
3.2.5 A toucan crossing is present on the A93 in the vicinity of the site access.
3.2.6 The main vehicle access into the West Park Retail Park is located 90m to the south of the
development access and features a ghost island facility for right turning traffic.
A9
3.2.7 The A9 is a primary trunk road in Scotland, linking Perth with the M90, and provides access to
Edinburgh in the south. To the north, the A9 carries on, providing access to Inverness and other
northern settlements. An A9 access point is located approximately 20km west of the site through a
priority-controlled T-junction which is subject to a speed limit of 60mph.
3.2.8 The site is therefore considered to be well located for access to the local, regional and national road
networks.
3.3 TRAFFIC BASE FLOWS
3.3.1 Traffic surveys have been undertaken at the following junctions to obtain existing traffic flows on the
local road network. The surveys were undertaken on Friday 21st June (07:00-19:00) and Saturday
22nd June 2024 (07:00-19:00) a neutral period outside of school holidays:

Page 74

Transport Assessment Page | 9 Project No 55002
Perth Road, Blairgowrie June 2025 
 Site access Road / A93 Perth Road (Retail Park North junction); and 
 Main Retail Park Access / A93 Perth Road (Retail Park South junction) 
3.3.2 The flows identified through the above survey have been converted to Passenger Car Units (PCUs)
for the purposes of capacity modelling, assuming the conversion factors set out below in Table 3-1.
Table 3-1 PCU Factors
3.3.3 The resultant 2024 peak hour flows are set out below:
 Junction 1: Friday network AM peak hour between 08:00 and 09:00;
 Junction 1: Friday network PM peak hour between 16:00 and 17:00; and
 Junction 1: Saturday network peak hour between 11:00 and 12:00.
3.3.4 Details of the 2024 base traffic flows are set out in Figure 6. 
3.4 PERSONAL INJURY COLLISION 
3.4.1 Personal Injury Collision (PIC) data for the local road network in the vicinity of the site has been
obtained and reviewed using Crash Map to identify accidents recorded by the police.
3.4.2 The most recent five-year period for which personal injury collision data is available for has been
considered (2022-2018). The area under consideration includes the A93 Perth Road from Dunkeld
Road to the north, to Golf Course Road in the south. 
3.4.3 A review of the Crash Map database displayed a total of one collision recorded within the study area,
which resulted in slight injury.
3.4.4 The collision occurred on the A93 Perth Road, approximately 215m north of the A93 Perth Road /
Hazelwood Road junction, to the north of the site access. Details regarding the collision are as follows:
 A collision resulting in slight injury occurred on the carriageway on the 9th of August 2019. It
was recorded that the collision involved two vehicles, with two casualties. No other road
users were recorded as being involved;
3.4.5 The PIC data demonstrates there was one slight collision to the north of the site within the most
recent five-year period. 
3.4.6 It is therefore concluded that there are no extant safety issues on the road network in the vicinity of
the development site. As such, it is considered that there are no existing road safety issues that would
be exacerbated by the development proposals. 
Car / LGV OGV1 OGV2 Bus/Coach Motorcycle Cycle
Factor 1.0 1.5 2.3 2 0.4 0.2

Page 75

Transport Assessment Page | 10 Project No 55002
Perth Road, Blairgowrie June 2025 
4 EXISTING SUSTAINABLE TRANSPORT
PROVISION
4.1 INTRODUCTION
4.1.1 NPF4 states that new developments should be provided in sustainable locations, where the need to
travel is minimised and the use of sustainable modes can be maximised. 
4.1.2 The site has a good level of accessibility and access to sustainable modes of transport within a
reasonable distance of the site. Travel by non-car modes will be encouraged, and the proposals
include pedestrian and cycle infrastructure within the site.
4.1.3 This section outlines the existing walking, cycling and public transport facilities within the vicinity of
the development site and describes the accessibility of the site in terms of its proximity to key
services and destinations.  
4.2 WALKING ACCESSIBILITY
4.2.1 Walking is considered to be the most important mode of travel at the local level and offers the
greatest potential to replace short car trips, particularly under two kilometres.
4.2.2 Figure 2 shows a 2km walking catchment area from the centre of the site. This demonstrates that the
entirety of Blairgowrie town centre can be accessed within 2km as well as residential areas to the
south and east of the site.
4.2.3 Good quality pedestrian infrastructure surrounds the site. In particular, a lit footway is provided along
both sides of the A93 Perth Road carriageway towards Blairgowrie town centre. A toucan crossing is
provided across the A93 in the vicinity of the site for access to residential areas to the east.
4.2.4 It is considered that customers and staff residing or working in the local area have good opportunities
to travel to the site on foot.
4.3 CYCLING ACCESSIBILITY
4.3.1 In addition to walking, cycling also has potential to substitute for short car trips, particularly those
under 5 kilometres, and to form part of a longer journey by public transport.
4.3.2 Figure 4 shows a 5km cycling catchment area from the centre of the site. This shows that the entirety
of Blairgowrie and Rattray can be accessed as well as surrounding residential areas to the north, south
and east. The areas of Rosemount and Carsie can also be accessed to the east and south of the site
respectively.
4.3.3 Cycle parking will be provided to further encourage and facilitate cycling to and from the site in the
form of three Sheffield stands which can accommodated six cycles.

Page 76

Transport Assessment Page | 11 Project No 55002
Perth Road, Blairgowrie June 2025 
4.4 PUBLIC TRANSPORT
Bus Services
4.4.1 The site well located for access by bus as the closest bus stops are located on the A93 Perth Road to
approximately 70m walking distance from the development entrance offering northbound services
towards Blairgowrie and Rattray and southbound services towards Perth. These bus stops are
provided with a shelter and timetable information. The southbound bus stop benefits from an existing
toucan crossing of the A93.
4.4.2 The bus stops located within the vicinity of the site are shown in Figure 5 and details of the buses
which serve them are provided in Table 4-1. 
Table 4-1 Local Bus Services
Service Route
Approximate Frequency 
Monday – Friday Saturday Sunday
58 Blairgowrie - Perth Up to 6 services
per day
Up to 6 services
per day Every 30 minutes
63 Carsie - Rattray Every 30 minutes Every 30 minutes No service
4.4.3 The services set out within Table 4-1 provide travel to a range of local destinations. Whilst it is less
likely that customers will travel to the site by bus, this forms a reasonable travel mode for employees.
4.5 SUMMARY
4.5.1 This section has shown that it is feasible for employees and customers to walk, cycle or use public
transport from the surrounding residential areas. Given the nature of the proposed use, it is
considered that the location of the site is consistent with national and local policy objectives.

Page 77

Transport Assessment Page | 12 Project No 55002
Perth Road, Blairgowrie June 2025 
5 DEVELOPMENT PROPOSALS
5.1 DEVELOPMENT PROPOSALS AND SITE LAYOUT
5.1.1 The development proposals are for a 292sqm gross internal area (GIA) McDonald’s restaurant with
drive-thru facility, including associated site access, servicing arrangements and parking. It is expected
that the restaurant would operate daily between the hours of 06:00 to 24:00. The proposed site
layout is attached at Appendix A. 
5.1.2 The McDonald’s car park will operate with a clockwise, one-way system. The drive-thru will
commence from the northwestern edge of the car park and continue around the north and east of
the building, exiting into the car park to the west. 
5.1.3 It is expected there would be approximately 55-75 direct full-time equivalent staff employed by the
restaurant. Staff work shifts and the number of staff expected to be on shift at any one time would
be 20 people. McDonald’s staff work varying shift patterns depending on their needs and the
requirements of the restaurant. The minimum core time is four hours.
5.2 PROPOSED ACCESS
5.2.1 Access to the external road network will be from an existing priority junction with the A93. Access
into the site will be created with a new priority junction on the northern side of the access road.
5.2.2 The current bellmouth serving the development plot will be stopped up. The existing footway to the
south of the site will continue into the site, providing safe pedestrian access fronting the site. 
5.2.3 It is proposed this existing access road will be widened to approximately 6m to permit two-way
vehicle movements up to and including the McDonalds site. The priority access junction into the site
will feature a dropped kerb crossing with tactile paving. 
5.2.4 A visibility splay drawing is presented in Appendix C – AMA-55002-SK002 which demonstrates that
visibility of 2.4m x 43m can be achieved for vehicles exiting the site. It should be noted when exiting
the site no vehicles will be approaching from the east as the access road becomes one-way
immediately to the west of the McDonalds access.
5.2.5 The access road continues west through a one-way carriageway, for further access into the retail
park. Principal vehicle access into the retail park will remain unchanged and will continue to be taken
from a separate ghost island junction to the south.
5.3 SERVICING ARRANGEMENTS
5.3.1 McDonald’s has been trading in the UK since 1974. The company operates over 1,348 fast service
restaurants (+90 ROI) of which around 1,204 are restaurants with drive thru facilities.
5.3.2 Martin Brower are McDonald’s sole distributor for all its products and have a fleet of 150 vehicles.
They utilise multi-temperature vehicles which allows all of the restaurant’s requirements for frozen,
chilled and ambient products to be delivered in one visit. This therefore reduces the number of
deliveries each restaurant receives.
5.3.3 Restaurants typically receive three deliveries per week. Servicing McDonald’s restaurants whilst they
are open is a common practise and does not present any operational difficulties.

Page 78

Transport Assessment Page | 13 Project No 55002
Perth Road, Blairgowrie June 2025 
5.3.4 Martin Brower use a sophisticated computerised planning tool (Paragon), which enables requirements
of delivery destinations to be set and ensures they are complied with on every occasion a delivery is
planned. The restaurant is allocated a 2-hour delivery slot and the delivery will be planned within this.
Notification of the planned delivery is emailed to the restaurant two days before delivery. On the day
of the delivery, the GPS system linked to Paragon will automatically email the restaurant 30-minutes
prior to the vehicles arrival.
5.3.5 The goods are typically delivered by a HGV lorry, up to 16.5m in length. This is usually parked for
between 15 minutes – 30 minutes within the 2-hour delivery slot. The duration of the stay depends
upon the range and quantity of products to be delivered.
5.3.6 It is proposed that servicing would be undertaken from the car park with deliveries scheduled to
arrive and depart outside of store trading hours. 
5.3.7 The swept path analysis is presented in Appendix B – AMA-55002-ATR005-1.5. The analysis
demonstrates that a delivery vehicle can enter, manoeuvre around and exit the site. 
5.3.8 Refuse collection for McDonald’s is undertaken by a private contractor three times per week. Waste
minimisation and recycling are promoted. Waste minimisation has been achieved through the re-
design of tray liners and specifying the use of light weight bin liners. Food wastage is minimised
through the use of a computer system which monitors the amount of food served at given times of
day resulting in more accurate preparation and ordering of stock. This therefore reduces the quantum
of waste and frequency of collection required. Service vehicles also collect empty delivery trays and
crates which are returned to supplies for reuse.
5.3.9 The swept path analysis is presented in Appendix B – AMA-55002-ATR005-2.5 based on a refuse
vehicle of 9.6m in length typically used by the private contractor. The analysis demonstrates that a
standard refuse vehicle can enter, manoeuvre around, and exit the site. Refuse collection will be
undertaken from the main car park within the northern parking aisle with similar arrangements to the
servicing as outlined in Section 5.3.8.
5.3.10 Cooking oil from restaurants is collected by Martin Brower’s delivery vehicles and is recycled into bio
diesel. The bio diesel is used as fuel by all McDonald’s delivery vehicles, resulting in a carbon saving
of 8,200 tonnes per annum.
5.3.11 The arrangements described above follow a ‘tried and tested’ methodology used successfully across
the UK and there are no reasons to suggest why it could not be successfully undertaken in this
location.
5.4 PARKING
5.4.1 The proposals include 38 car parking spaces, including three accessible spaces and two grill bays to
serve the McDonald’s restaurant. Six cycle parking spaces in the form of Sheffield cycle hoops will
also be provided. A further three motorcycle spaces will be provided. 
5.4.2 The proposed level of parking provision is in line with McDonald’s operational requirements as
proven over numerous sites across the country. The proposed level of parking provision has also been
shown to be suitable based on the surveyed peak parking demand set out within Section 6. 
5.4.3 The proposed quantum of parking would comply with the standards set out in the National Roads
Development Guide for Class 3 use with three accessible bays and would be below the potential
maximum vehicle parking level of 58 spaces based on GFA. Furthermore, the provision for cycle and
motorcycle spaces would accord with national standards. The provision is therefore considered to
be appropriate.

Page 79

Transport Assessment Page | 14 Project No 55002
Perth Road, Blairgowrie June 2025 
5.4.4 It is also noted the existing retail park to the south offers c.115 parking spaces and this will likely
lead to linked trips on foot between the retail park and the McDonalds restaurant. 
5.5 DRIVE-THRU LANE OPERATION
5.5.1 The drive-thru lane forms an integral part of the McDonald’s operation, and this lane is shown to
route around the northern and eastern extents of the site.
5.5.2 When a customer wishes to purchase a meal without leaving their vehicle, the following steps are
taken:
 Enter the drive-thru lane;
 Place an order at a Customer Order Display (COD) units;
 Pay at the first booth; and
 Collect meal from the second booth.
5.5.3 In the event that a customer places a large or unusual order, which could take longer to prepare (and
potentially delay other drivers using the drive-thru lane), then a member of staff will divert them to
one of the ‘reserve bays’. Once the order is ready, a member of staff will carry the meal from the
restaurant to the customer. 
5.5.4 In order to assist with order taking, the proposal includes two vertical ordering points, so that
customer orders can be prepared quicker. Drivers waiting to order would use the first available COD
unit within the singular drive thru lane depending upon how many vehicles are waiting. Both COD
units would operate simultaneously at all times of the day, and in practice, can be likened to a dual
pay barrier arrangement at multi-storey car parks across the country.
5.5.5 There is space within the drive-thru lane for 13 vehicles to stack from the order point. There is further
space within the car park for two additional vehicles to wait without obstructing the general
operation of the car park.

Page 80

Transport Assessment Page | 15 Project No 55002
Perth Road, Blairgowrie June 2025 
6 ASSESSMENT PARAMETERS
6.1 INTRODUCTION
6.1.1 This section sets out the methodology and parameters used in assessing the proposed development
and its potential impact on the road network.
6.2 ASSESSMENT YEARS
6.2.1 The following assessment years have been considered in respect of analysing the capacity of the local
road network:
 2024 Base Year – representing the existing situation on the local road network; and
 2029 Future Year – representing a horizon period of five years after the lodging of the planning
application. This allows time for the development to be constructed and for it to become
operational.
6.3 FUTURE YEAR ASSESSMENT SCENARIOS
Do Minimum Scenario
6.3.1 The Do-Minimum scenario is considered to represent a future year situation on the local road
network, without the proposed development taking place. In addition to the Base scenario, all local
background traffic growth has been included. The resulting 2029 Do-Minimum Traffic Flows are set
out on Figure 7 for the weekday AM and PM and Saturday peak hours, respectively.
With Development Scenario
6.3.2 The With-Development scenario is considered to represent the future situation on the local road
network with the proposed development. The traffic flows have been derived by adding the
development traffic flows (which reflect the likely vehicle trip generation associated with the
proposals) to the Do Minimum Traffic Flows. The resulting 2029 With Development Traffic Flows
are set out on Figure 9 for the weekday AM and PM and Saturday peak hours, respectively.
6.4 TRAFFIC GROWTH
6.4.1 Tempro version 8.1 has been used to growth up the 2024 base data to provide 2029 traffic flows
using growth factors for Perth & Kinross. These are summarised below:
 AM Peak Hour Period: 1.031
 PM Peak Hour Period: 1.027
 Saturday Inter Peak Hour Period: 1.028
6.5 COMMITTED DEVELOPMENTS
6.5.1 Committed development flows have been included for all future residential phases of the Westpark
development located to the north of the site, comprising 417 dwellings. 
6.5.2 Traffic flows have been obtained from the approved September 2017 Transport Assessment
produced by Andrew Carrie Consultants. Retail Park traffic flows were removed as these have been
picked up within the traffic surveys to avoid double counting. The committed residential flows have
been included in all future year 2029 assessments.

Page 81

Transport Assessment Page | 16 Project No 55002
Perth Road, Blairgowrie June 2025 
6.6 DEVELOPMENT TRAFFIC GENERATION
6.6.1 McDonald’s operates in excess of 1,300 restaurants across the UK and it is key to their business to
ensure efficient operation of all sites to ensure quality of service and efficiency. Therefore, to adopt
robust trip rates for the proposed drive thru proposal McDonalds regularly undertake traffic counts
and customer interview surveys on newly opened and existing sites to provide robust data for new
restaurants in terms of trip generation and types of trips.
6.6.2 One of McDonald’s appointed roads consultant’s (ADL) have previously commissioned counts and
customer interview surveys at three McDonald’s restaurants with drive thru facilities located in areas
of similar characteristics and surroundings to that of the proposed site. These are as follows:
 Pomphlett Road, Plymouth, PL9 7BH;
 Dundee Road, Arbroath, DD11 2NQ; and
 Morris Street, Wigan, WN1 3RB.
6.6.3 These restaurants are considered to be the most appropriate comparable restaurants for the
following reasons:
 All restaurants are located on key edge of town arterial routes;
 All restaurants are located adjacent to a significant retail / food store offering; and
 The restaurants are of a similar scale to the proposal.
6.6.4 The average of the three survey results has been taken as the proposed traffic generation for the site
for the Friday PM and Saturday Peaks. The resultant peak hour traffic generations are detailed in
Table 6-1.
Table 6-1 Proposed PM Peak Hour Trip Generation and Surveyed Saturday Trip Generation
Peak Hour
Proposed Traffic
In Out
Weekday 18:00 – 19:00 94 99
Saturday 13:00 – 14:00 102 112
6.6.5 As can be seen, the proposed site would generate approximately 193 two-way vehicle trips in the
PM peak hour and 214 two-way vehicle trips in the Saturday inter peak hour.
6.6.6 Average specific trip restaurant rates are considered appropriate and highly robust for use as there is
proven to be no significant relationship between McDonald’s traffic and floor area, dining area,
seating numbers or parking provision with each restaurant having a varying number of trips
generated, therefore the above is considered appropriate and is not adjusted by any specific variable.
TRICS Database
6.6.7 To ensure the highest trip generation for the proposed development has been assessed in each
scenario, the TRICS database has also been interrogated. As there are no existing surveys during the
AM peak period, the resultant TRICS trip rates and generation will be used for the AM peak period.
For the PM and Saturday peak periods, the higher of the existing surveys and TRICS generated trips
will be used for the site, ensuring a robust assessment of the site.

Page 82

Transport Assessment Page | 17 Project No 55002
Perth Road, Blairgowrie June 2025 
6.6.8 For the TRICS report, McDonald’s restaurants in ‘Edge of Town Centre’, ‘Suburban’ and ‘Edge of
Town’ locations have been selected – all of the sites included are occupied by McDonald’s, ensuring
the data is relevant to the proposals. 
6.6.9 Whilst outside of the recorded AM, PM and Saturday network peak hours, the peak hour selected
from the TRICS output for the respective peaks are 10:00 to 11:00, 18:00 to 19:00 and 12:00 to
13:00, ensuring a robust assessment.  
6.6.10 The TRICS trip rates and resulting vehicle trip generation are summarised in Table 6-2 whilst the full
outputs are appended at Appendix D. 
Table 6-2 Proposed AM and Saturday Peak Hour Trip Generation 
Peak Hour
Trip Rates Trip Generation
Arrivals Departures Arrivals Departures
Weekday AM 10:00-11:00 16.005 15.734 40 39
Weekday PM 18:00-19:00 20.904 21.879 52 55
Saturday 12:00-13:00  37.946 36.905 95 92
6.6.11 As set out within Table 6-1, the observed trips from McDonalds store surveys for the weekday PM
peak and Saturday peak are higher than the TRICS trips set out in Table 6-2.
6.6.12 Therefore, to ensure a robust approach, the existing McDonalds stores will be used for the weekday
PM and Saturday peak periods. The TRICS trip generations will be used for the weekday AM peak
period assessment.
6.7 MCDONALDS TRIPS BY TYPE
6.7.1 Given the location of the proposed site adjacent to a main road, and the distance of the site from a
major settlement, it is considered that the majority of trips attracted to the site are unlikely to be new
to the network, but existing trips that visit the site enroute to another destination. The primary trip
types referred to in this report are as follows:
Additional Trips
6.7.2 These are specific car journeys to visit the McDonald’s, whereby customers return to their original
location immediately after completing their visit:
 e.g. Home  McDonald’s  Home
 In the case of the proposed restaurant these are specific car journeys to visit the restaurant

Page 83

Transport Assessment Page | 18 Project No 55002
Perth Road, Blairgowrie June 2025 
Diverted Trips
6.7.3 These are trips where a driver is already on the network and alters their route to visit the McDonald’s:
 Home  McDonald’s  Other 
 Work  McDonald’s  Home
 In the case of the proposed restaurant, these are existing trips on the A93 Perth Road which
divert to the site. It is not expected that drivers would divert from the wider road network (i.e.
the A9) given the travel distances involved. However, due to the lack of other McDonald’s
restaurants in the area, diverted travel distances may be longer.
Pass By Trips
6.7.4 These are also trips which are already on the network in any event which as the driver passes the
McDonald’s they decide to make a visit.
6.7.5 In the case of the proposed restaurant, these would be trips “passing” the site along the A93 Perth
Road.
Shared Trips
6.7.6 These are trips which are undertaken to visit multiple uses within a single location. In the case of the
proposed development, surrounding facilities include a retail park which has the possibility of sharing
trips between other shops within the location.
6.7.7 It should be noted that ‘Additional Trips’ are not necessarily all ‘new’ trips, as customers of the new
restaurant may well have previously visited other restaurants or hot food takeaway locations.
Collectively pass-by and diverted can be referred to as ‘existing trips’ as these represent existing
vehicles already on the network.
Percentage Split of Trip Types
6.7.8 The customer interview survey results have been fully analysed and the average survey results are
provided in Table 6-3. 
Table 6-3 Proposed Trips by Type
Trip Type Definition
Friday PM Saturday
No. % No. %
Additional
Trips
Same origin & destination
McDonald’s sole purpose of trip 7 13% 10 16%
Existing
Trips
Different origin & destination 10 18% 3 4%
Same origin & destination
McDonald’s not sole purpose of
trip
26 42% 30 44%
Shared Trip Visit local facilities before or
after McDonald’s 16 28% 22 36%
Total Survey 59 100% 65 100%

Page 84

Transport Assessment Page | 19 Project No 55002
Perth Road, Blairgowrie June 2025 
6.7.9 Table 6-3 details that on a Friday PM Peak 13% of trips to the McDonald’s restaurant could be
expected to be additional trips and 87% would be existing on the road network. For the Saturday
Peak 16% would be additional trips and 84% already existing on the road network.
6.7.10 The results also demonstrate that 28% and 36% for the Friday and Saturday peaks respectively could
be expected to be shared trips with the adjacent retail park.
6.7.11 Based upon the McDonald’s proportional trip types proposed in Table 6-3, the proposed peak hour
traffic has been split into additional, pass by / diverted and shared trips in Table 6-4. 
Table 6-4 – Proposed Trip Generation By Type
Trip Type
From TRICS From Existing Surveys From Existing Surveys
Friday AM Friday PM Saturday
% In Out % In Out % In Out
Additional 13% 5 5 13% 12 13 16% 16 18
Pass-by 59% 24 23 59% 56 58 48% 49 54
Shared 28% 11 11 28% 26 28 36% 37 40
Total 100% 40 39 100% 94 99 100% 102 112
6.7.12 Whilst no surveys were undertaken at the chosen McDonald’s stores in the AM peak period, it has
been assumed that the trip proportions from the PM peak would be similar and have therefore been
applied to the trips in the AM peak period.
6.7.13 The following trips would therefore be generated by the proposed restaurant in the peak hours:
Friday AM Peak
 10 ‘new’ two-way trips on the network; and
 47 two-way trips as ‘existing journeys’ making a visit to the restaurant
 22 two-way trips ‘shared’ with the adjacent retail uses.
Friday PM Peak
 25 ‘new’ two-way trips on the network; and
 114 two-way trips as ‘existing journeys’ making a visit to the restaurant.
 54 two-way trips ‘shared’ with the adjacent retail uses.
Saturday Peak
 34 ‘new’ two-way trips on the network; and
 103 two-way trips as ‘existing journeys’ making a visit to the restaurant.
 77 two-way trips ‘shared’ with the adjacent retail uses.

Page 85

Transport Assessment Page | 20 Project No 55002
Perth Road, Blairgowrie June 2025 
6.7.14 In the worst-case scenario, 34 new two-way trips would be generated by the proposals, which is
approximately one trip every two minutes during the Saturday peak hour. It is not considered that
this represents a significant impact, however, for robustness this will be assessed further in 
Section 7 of this TA.
6.8 DEVELOPMENT TRAFFIC DISTRIBUTION AND ASSIGNMENT
Additional Trips
6.8.1 It can be assumed that those trips that are new to the network, specifically to visit the site, will come
from the local area. It is not envisaged customers will travel a significant distance to access a
McDonald’s. Furthermore, the nearest existing McDonald’s to the site, is 26km away in Perth, making
the site a lone option for customers in the region.
6.8.2 The distribution of new trips at the site access / A93 junction has used the turning proportions of
observed movements from the survey of the main retail park access junction as a proxy given this is
the more heavily used junction at present. The average turning proportions across all time periods
are shown below. These were applied to new vehicle movements:
 65% to/75% from the north
 35% to/25% from the south
6.9 PARKING DEMAND
6.9.1 The average parking demand for the proposed McDonald’s (including staff, grill bays and accessible
parking) is expected to be as follows based on the demand surveyed at the three comparable sites:
 Friday – 26 vehicles; and
 Saturday – 29 vehicles.
6.9.2 It should be noted that any overspill parking was captured within the surveys in order to provide an
accurate picture of the parking situation.
6.9.3 The parking proposals for 38 spaces (including two grill bays) is therefore sufficient to accommodate
the expected level of demand on site.
6.10 DRIVE-THRU QUEUE
6.10.1 The proposed drive-thru queues are based upon the average queues of the three surveyed restaurant
sites which are summarised in Table 6-5. This includes all vehicles waiting in the drive-thru lane back
from the collection booth. 
Table 6-5 Drive Thru Queues 
Friday PM Peak Saturday Peak
Min Q 0 0
Max Q 7 9
Average 4 3
6.10.2 The proposed drive-thru lane has the capacity to accommodate approximately 12 vehicles from the
collection point to the entrance from the car park, therefore, is more than suitable to meet anticipated

Page 86

Transport Assessment Page | 21 Project No 55002
Perth Road, Blairgowrie June 2025 
demand during peak times. A further two vehicles can be accommodated within the car park between
the drive-thru lane entry and the site access. 
6.11 SUMMARY
6.11.1 The trip generation for the proposed restaurant has been derived based on three existing McDonald’s
restaurant sites. All three of the McDonald’s sites are considered to be similar in location, being that
they are all situated within close proximity to arterial routes and have similar scales to the proposal.
6.11.2 The assumptions behind the proportions of additional, existing and shared trips generated by the
development are considered appropriate and robust.
6.11.3 These assumptions have been applied to the future year assessment and the impact of the proposed
restaurant on the capacity of the road network is detailed in Section 7.

Page 87

Transport Assessment Page | 22 Project No 55002
Perth Road, Blairgowrie June 2025 
7 FUTURE DEVELOPMENT IMPACTS
7.1 INTRODUCTION
7.1.1 As set out in detail within Section 6 of this TA, the additional new trips have been calculated based
on existing McDonald’s Restaurant sites of similar characteristics in terms of location, size and
operation, as well as the TRICS database. 
7.1.2 The following scenarios have been assessed for the weekday AM and PM peak hours and the
Saturday peak hour:
 2024 Base (Figure 6);
 2029 Future Year (Figure 7) including committed development; and
 2029 Future Year + Proposed New Development Traffic (Figure 9).
7.1.3 The detailed modelling outputs are provided in Appendix E and the findings from the scenarios are
set out in this section.
7.1.4 JUNCTIONS 9 software has been used to assess the capacity of the existing access junction from the
A93 Perth Road. This comprises a standards priority junction arrangement. JUNCTIONS 9 analyses
the maximum Ratio of Flow to Capacity (RFC) values for the peak hours and the maximum queue
length in passenger car units (PCUs).
7.1.5 The RFC provides the primary measure of junction performance and is reported for each entry arm.
An RFC of 0.85 or lower indicates that the specific arm of the junction is operating within its practical
capacity; an RFC greater than 1.0 indicates that traffic demand exceeds theoretical capacity. Queue
length provides an indication of how the overall junction performance may affect adjacent junctions
on the road network. 
7.2 ACCESS ROAD / A93
7.2.1 The results of the modelling are summarised in Table 7-1 below, with the full model outputs included
at Appendix E.
Table 7-1 A93 / Site Access Capacity Assessment
Scenario Link AM Peak PM Peak Sat Peak
RFC Q RFC Q RFC Q
2024 Base Access Road  0.03 0.0 0.0 0.0 0.01 0.0
A93 North  0.03 0.0 0.01 0.0 0.01 0.0
2029 Base Access Road  0.03 0.0 0.00 0.0 0.01 0.0
A93 North  0.03 0.0 0.01 0.0 0.02 0.0
2029 With
Development
Access Road 0.12 0.1 0.27 0.4 0.29 0.4
A93 North  0.10 0.2 0.21 0.5 0.23 0.6
7.2.2 The assessment demonstrates that, regardless of the future development scenario, the junction
would operate with a significant degree of spare capacity in the modelled assessment scenarios
during the AM, PM and Saturday peak hours, with minimal queuing and delay.

Page 88

Transport Assessment Page | 23 Project No 55002
Perth Road, Blairgowrie June 2025 
7.3 SUMMARY
7.3.1 In summary, it can be concluded the site access junction will operate effectively in the base year, and
will continue to do so in the future, when background growth and the proposed net development
flows are considered.
7.3.2 The trips associated with the proposed development are not expected to lead to an unacceptable
impact on operational performance and would thus mee the NPF4 policy test.

Page 89

Transport Assessment Page | 24 Project No 55002
Perth Road, Blairgowrie June 2025 
8 SUMMARY
8.1.1 Andrew Moseley Associates has been commissioned by McDonald’s Restaurants Ltd to prepare this
Transport Assessment and an Interim Travel Plan to accompany a planning application for a
McDonald’s restaurant with a drive-thru off the A93 Perth Road in Blairgowrie.
8.1.2 The Local Planning Authority and the Local Roads Authority is Perth and Kinross Council. 
8.1.3 The proposed site is located approximately 1.4km south of the centre of Blairgowrie and would form
part of the wider West Park Retail Park. Currently the site comprises undeveloped land which is
bound to the north and west by further undeveloped land, to the east by the A93 Perth Road, and to
the south by an unnamed access road associated with the retail park. 
8.1.4 Access to the external road network will be from an existing priority junction with the A93. Access
into the site will be created with a new priority junction on the northern side off an existing access
road. 
8.1.5 The current bellmouth serving the development plot will be stopped up. The existing footway to the
south of the site will continue into the site, providing safe pedestrian access fronting the site. 
8.1.6 The report has shown that the development proposals will be accessible by a range of travel modes
and have been developed to accord with current national and local transport policies, including those
set out within National Planning Framework 4, Planning Advice Note 75 and the Perth and Kinross
Local Development Plan, 
8.1.7 It is concluded that the site is accessible on foot and cycle from residential areas that surround the
site and benefits from being located adjacent to bus stops and a toucan crossing of the A93. 
8.1.8 A review of existing road safety data within the study area returned one slight collision on the A93
to the north of the site. It is therefore concluded there are no extant safety issues on the road network
that would be exacerbated by the development proposals. 
8.1.9 The development proposals are forecast to generate around 80, 195 and 215 two-way vehicle trips
during the AM, PM and Saturday peak hours respectively. However, the proposals only result in 13%
to 16% of trips being new additional traffic in the weekday and Saturday network peak periods
respectively. The remainder of trips will comprise either ‘pass-by’ trips already on the local road
network or shared trips associated with adjacent land uses at the retail park. Therefore, the
development would result in a maximum of 34 ‘new’ trips onto the local road network in the Saturday
peak period.
8.1.10 A Travel Plan has also been prepared which sets out measures to encourage sustainable travel
patterns and reduce the reliance on private car use.
8.1.11 Junction modelling has been undertaken of the existing priority junction with the A93 and
demonstrates this would continue to operate with a significant level of spare capacity with the
addition of development traffic.
8.1.12 The development proposals are not expected to lead to an unacceptable impact on operational
performance of the local road network and would thus meet the NPF4 policy test. Therefore, there
are no overriding traffic and transportation reasons preventing the local roads authority from
recognising that the proposals are acceptable nor why planning permission could not be granted.

Page 90

FIGURES
Figure 1 – Indicative Site Location Plan
Figure 2 – 2km Walking Isochrone
Figure 3 – Public Rights of Way Map
Figure 4 – 5km Cycling Isochrone
Figure 5 – Bus Stop Location Plan
Figure 6 – 2024 Survey Flows
Figure 7 – 2029 Traffic Flows
Figure 8 – Development Flows
Figure 9 – Committed Development Flows 
Figure 10 – Additional Trip Distribution (%)
Figure 11 – 2029 Do Something Flows

Page 91

Figure 1
Site Location Plan
Perth Road, Blairgowrie
ECT
Title:
Figure No.: Drawn By:
Key:
Site Location

Page 92

Figure 2
2km Walking Catchment Plan
Perth Road, Blairgowrie
ECT
Title:
Figure No.: Drawn By:
Key:
400m
800m
1200m
1600m
2000m
Site Location

Page 93

Figure 3
Public Rights of Way Map
Perth Road, Blairgowrie
ECT
Title:
Figure No.: Drawn By:
Key:
Footpaths
Site Location

Page 94

Figure 4
5km Cycling Catchment Plan
Perth Road, Blairgowrie
ECT
Title:
Figure No.: Drawn By:
Key:
1000m
2000m
3000m
4000m
5000m
Site Location

Page 95

Figure 5
Bus Stop Locations Plan
Perth Road, Blairgowrie
ECT
Title:
Figure No.: Drawn By:
Key:
Site Location
Bus Stops

Page 96

AM 320 AM 297
PM 438 PM 375
SAT 351 SAT 356
AM 11 286
AM PM SAT PM 2 373
8 3 5 SAT 6 349
5 0 0
AM 6 311
PM 2 434
SAT 6 345
AM 63 227
AM PM SAT PM 90 284
32 101 87 SAT 117 235
33 56 43
AM 26 360 AM 260
PM 28 400 PM 340
SAT 24 264 SAT 278
AM 387
PM 427
SAT 288
Hazelwood Road
A93
Essendy Road
A93
Site Access
Retail Park
A93
25/11/2024 55002 Blairgowrie In PCU's
11:00-12:00JH
08:00-09:00
AMA/55002
Drawn by:
PM 16:00-17:00
2024 Survey Flows
CF
Figure 6
Checked:
SAT
AM

Page 97

AM 1.031
PM 1.027
Saturday 1.028
AM 360 AM 381
PM 521 PM 426
SAT 423 SAT 442
AM 11 370
AM PM SAT PM 2 424
8 3 6 SAT 7 436
5 0 0
AM 6 352
PM 2 518
SAT 6 417
AM 65 309
AM PM SAT PM 92 333
33 104 89 SAT 120 318
34 58 44
AM 27 402 AM 343
PM 28 482 PM 391
SAT 25 333 SAT 362
AM 429
PM 511
SAT 358
Hazelwood Road
A93
Essendy Road
A93
Site Access
Retail Park
A93
25/11/2024 55002 Blairgowrie In PCU's
11:00-12:00JH
08:00-09:00
AMA/55002 Drawn by: PM 16:00-17:00
2029 Base
CF
Figure 7 Checked: SAT
AM

Page 98

AM 26 AM 30
PM 64 PM 71
SAT 73 SAT 77
AM 30
AM PM SAT PM 71
26 64 73 SAT 77
14 35 39
AM 10
PM 24
SAT 26
AM 14
AM PM SAT PM 35
SAT 39
AM 10 AM 14
PM 24 PM 35
SAT 26 SAT 39
AM 10
PM 24
SAT 26
Hazelwood Road
A93
Essendy Road
A93
Site Access
Retail Park
A93
25/11/2024 55002 Blairgowrie In PCU's
11:00-12:00JH
08:00-09:00
AMA/55002 Drawn by: PM 16:00-17:00
Development Flows
CF
Figure 8 Checked: SAT
AM

Page 99

AM 31 AM 75
PM 72 PM 41
SAT 62 SAT 77
C
AM 75
AM PM SAT PM 41
B SAT 77
AM 31
A PM 72
SAT 62
AM 75
AM PM SAT PM 41
SAT 77
AM 31 AM 75
PM 72 PM 41
SAT 62 SAT 77
AM 31
PM 72
SAT 62
11:00-12:00JH
08:00-09:00
AMA/55002 Drawn by: PM 16:00-17:00
Committed Development Flows
CF
Figure 9 Checked: SAT
AM
A93
25/11/2024 55002 Blairgowrie In PCU's
Hazelwood Road
A93
Essendy Road
A93
Site Access
Retail Park

Page 100

AM AM
PM PM
SAT SAT
AM 75%
AM PM SAT PM 75%
65% 65% 65% SAT 75%
35% 35% 35%
AM 25%
PM 25%
SAT 25%
AM
AM PM SAT PM
SAT
AM AM
PM PM
SAT SAT
AM
PM
SAT
Hazelwood Road
A93
Essendy Road
A93
Site Access
Retail Park
A93
25/11/2024 55002 Blairgowrie In PCU's
JH
AMA/55002 Drawn by:
Trip Distribution
CF
Figure 10 Checked:

Page 101

AM 386 AM 411
PM 586 PM 496
SAT 495 SAT 519
AM 41 370
AM PM SAT PM 73 424
34 68 78 SAT 83 436
19 35 39
AM 16 352
PM 26 518
SAT 32 417
AM 65 323
AM PM SAT PM 92 368
33 104 89 SAT 120 357
34 58 44
AM 27 412 AM 357
PM 28 506 PM 425
SAT 25 359 SAT 402
AM 439
PM 534
SAT 383
Hazelwood Road
A93
Essendy Road
A93
Site Access
Retail Park
A93
25/11/2024 55002 Blairgowrie In PCU's
11:00-12:00JH
08:00-09:00
AMA/55002 Drawn by: PM 16:00-17:00
2029 Do Something
CF
Figure 11 Checked: SAT
AM

Page 102

APPENDICES
Appendix A - Proposed Site Layout
Appendix B – Swept Path Analysis
Appendix C – Site Access Junction and Visibility Splay
Appendix D – TRICS Outputs
Appendix E – Capacity Modelling Outputs

Page 103

APPENDIX A 
PROPOSED SITE LAYOUT

Page 104

Starbucks
Bespoke
McDonald's
Restaurant
NG50
Entrance
CBCB
LPLP
Bespoke
Corral
BOL
BOL
LPLP
LPLP
DKDK
LPLP
2 no. Grill Bays
38no. Car Parking Spaces
(Inc. 3no. Accessible Bays)
Patio
Deliveries
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
3
2
9
7
5
4
1212
1010
2 no. Grill Bays
38no. Car Parking Spaces
(Inc. 3no. Accessible Bays)
Patio
Deliveries
- 13/03/2025 AGAG BSC
Initial Issue
project
client
drawing title
date
scale@A1
drawn
checked
drawing stage
aew
architects
0161 214 4370
www.aewarchitects.com
Job No
Rev
Purpose of Issue
Drawn by: -Date Checked by: -REV
store
NOTES
· All dimensions and levels are to be checked on site.
· Any discrepancies are to be reported to the architect
before any work commences.
· Whilst information on this sheet is issued to scale,
scaling directly from this drawing may result in
inaccuracies. For precise measurements, refer to the
stated dimensions or contact the Architect.
· This drawing shall not be reproduced without express
written permission from AEW.
· Title overlay drawings and ownership boundaries are
produced using all reasonable endeavours. AEW cannot
be responsible for the accuracy or scale discrepancy of
base plans supplied to them.
· All works are to be undertaken in accordance with
Building Regulations and the latest British Standards.
· All proprietary materials and products are to be used
strictly in accordance with the manufacturers
recommendations.
For Information
Planning
McDonald's Restaurants Ltd
2473Blairgowrie
Perth Road
Proposed Site Plan
13/03/2025
1:200
AGAG
BSC
13638_AEW_2473_1004
D
0 2 4 6 8 10m
Scale 1:200
N
Planning
Proposed Site Plan
Project Notes
· All drawings to be read in conjunction with all other
drawings as noted on issue sheet.
Drawing based:
· Glanvilles Topographical Survey drawing 4240368/4101
Dated:01/07/24
· Ordnance Survey (c) Crown Copyright 2023. All rights
reserved. Licence number 100022432
· Westpark, Blaigowrie Draft Site 7 Disposition drawing
DISPOSITION - PLAN 1(30560098.2) (1) Dated:
12/08/24
· LAUK Lighting Layout drawing no.
6279828_CALC_McDonalds Blairgowrie (R1), Dated:
18/06/25
· Existing below ground utilities/services unknown,
Intrusive surveys required
McDonald's Demise Boundary Indicated:
McDonald's Application Boundary Indicated:
Extent of No Build Zone:
Extent of Landscaping Buffer Zone:
General Site Proposal Notes:
'DOT' denotes Department of Transport Signs installed in
accordance will all Approved Documents and British Standards.
'DK' denotes location of drop kerbs to be installed.
Drop kerbs to be installed:
· Along delivery routes
· Around Accessible Parking Bays in accordance with AD M
· At Pedestrian crossing point
Yellow Thermoplastic Material to:
· All Drive Thru related road markings
· Accessible parking bays in accordance with AD M
· Parked order bays
White Thermoplastic Material to:
· Car park related road markings to be in white thermoplastic
material
· Standard parking bays to be finished in white thermoplastic
material
· All junction road markings
· All pedestrian crossings
Site Plan
Scale 1:200
Parking Schedule
Bay Type Proposed
Accessible Bays 3
Grill Bays 2
General Bays 3333
EVC Bays 0
Total Car Bays 3838
Cycle Spaces 6
Motorcycle Spaces 3
Schedule of Areas
Proposed
Site Area (Hectares) 0.2885
Building GEA (m²) (exc. Corral) 314.4
Building GEA (m²) (inc. Corral) 373.5
Building GIA (m²) 291.7
Proposed 600mm high Timber Knee
Rail Fence
Proposed 1100mm high Close Boarded
Timber Fence
Target Bin
Cranked bollards
Painted Black
Tactile Blister Paving
"LP" Denotes Lamppost
Site Features Key
CBCB
LPLP
150mm Diameter stainless steel
protective bollard
BOL
A 20/03/2025 WJB BSC
Building moved slightly north and squared off to the south. Patio,
Drive Thru and Parking reworked to accommodate change.
B 09/05/2025 WJB BSC
Building footprint moved south, corral enlarged and patio, drive
thru and site reworked to accommodate change.
C 06/06/2025 WJB BSC
Building footprint updated, cash booth relocated. Site, drive thru,
patio and corral layout updated to suit new building footprint
Proposed 1500mm high Close Boarded
Timber Fence (Subject to Acoustic
Specialist Design)
D 10/06/2025 WJB BSC
Acoustic fence line added. LAUK Lighting layout added.

Page 105

APPENDIX B 
SWEPT PATH ANALYSIS

Page 106

Bespoke
McDonald's
Restaurant
NG50
Entrance
CBCB
DOT
DOT
DOT
DOT
DOT
LPLP
DKDK
DOT
DOT
Bespoke
Corral
Sign 9
Digital Unit Single
Sign 12
Height Restriction Goal Post
Sign 15 & 16
COD DT Canopy & Order Post
Sign 10
Digital Unit Double
Sign 15 & 16
COD DT Canopy & Order Post
Sign 21
Drive Totem 2
Sign 14
Double Sided Banner Unit
BOL
BOL
DOT
DOT
DOT
LPLP
LPLP
Sign 14
Double Sided Banner Unit
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
Sign 10
Digital Unit Double
1111
1212
DOT
DOT
1
1
1
13.6
6.53
Max 90° Horiz
Max 10° Vert
1.88
6.4 1.4 1.4
7.8
1.4
2.52
4.78
1.37 3 1.4
3.7
0.29
Max Legal Length (UK) Articulated Vehicle (16.5m)Overall Length 16.500mOverall Width 2.550mOverall Body Height 3.681mMin Body Ground Clearance 0.411mMax Track Width 2.500mLock to lock time 6.00sKerb to Kerb Turning Radius 6.530m
Transport &
Infrastructure
Consultants
15 St Paul's Street
Second Floor
Leeds
LS1 2JG
www.amatp.co.uk
Project:
PERTH ROAD, BLAIRGOWRIE
Client:
MCDONALDS RESTAURANTS
Drawing:
MB ARTICULATED
VEHICLE SWEPT PATH ANALYSIS
ACCESS
AMA-55002-ATR-001 2.6
Drawing No.
P02
Rev.
Drawn By:
Checked:
Date:
Scale:
26.06.2025CFCF
JHJH 1:500 A3A3
P01 Preliminary Issue 27.05.25 OHJ
Paper:
P02 Updated Site Layout 26.06.25 CFCF

Page 107

Bespoke
McDonald's
Restaurant
NG50
Entrance
CBCB
DOT
DOT
DOT
DOT
DOT
LPLP
DKDK
DOT
DOT
Bespoke
Corral
Sign 9
Digital Unit Single
Sign 12
Height Restriction Goal Post
Sign 15 & 16
COD DT Canopy & Order Post
Sign 10
Digital Unit Double
Sign 15 & 16
COD DT Canopy & Order Post
Sign 21
Drive Totem 2
Sign 14
Double Sided Banner Unit
BOL
BOL
DOT
DOT
DOT
LPLP
LPLP
Sign 14
Double Sided Banner Unit
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
Sign 10
Digital Unit Double
1111
1212
DOT
DOT
5
5
13.6
6.53
Max 90° Horiz
Max 10° Vert
1.88
6.4 1.4 1.4
7.8
1.4
2.52
4.78
1.37 3 1.4
3.7
0.29
Max Legal Length (UK) Articulated Vehicle (16.5m)Overall Length 16.500mOverall Width 2.550mOverall Body Height 3.681mMin Body Ground Clearance 0.411mMax Track Width 2.500mLock to lock time 6.00sKerb to Kerb Turning Radius 6.530m
Transport &
Infrastructure
Consultants
15 St Paul's Street
Second Floor
Leeds
LS1 2JG
www.amatp.co.uk
Project:
PERTH ROAD, BLAIRGOWRIE
Client:
MCDONALDS RESTAURANTS
Drawing:
MB ARTICULATED
VEHICLE SWEPT PATH ANALYSIS
AMA-55002-ATR-001 1.6
Drawing No.
P02
Rev.
Drawn By:
Checked:
Date:
Scale:
26.06.2025CFCF
JHJH 1:500 A3A3
P01 Preliminary Issue 27.05.25 OHJ
Paper:
P02 Updated Site Layout 26.06.25 CFCF

Page 108

9.595
1.665 3.382 1.318
4.7
Phoenix2-18W (with Elite2 6x2MS chassis)
Overall Length 9.595m
Overall Width 2.530m
Overall BodyHeight 3.205m
Min BodyGround Clearance 0.410m
TrackWidth 2.500m
Lockto locktime 4.00s
Kerbto KerbTurning Radius 8.950m
Bespoke
McDonald's
Restaurant
NG50
Entrance
CB
DOT
DOT
DOT
DOT
DOT
LP
DOT
DOT
Bespoke
Corral
Sign 12
Height Restriction Goal Post
Sign 15 & 16
COD DT Canopy & Order Post
COD DT Canopy & Order Post
Sign 21
Drive Totem 2
BOL
BOL
DOT
DOT
DOT
LP
Sign 14
Double Sided Banner Unit
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
3
1
2
5
DOT
DOT
Bespoke
McDonald's
Restaurant
NG50
Entrance
CB
DOT
DOT
DOT
DOT
DOT
LP
DK
DOT
DOT
Bespoke
Corral
Sign 12
Height Restriction Goal Post
Sign 15 & 16
COD DT Canopy & Order Post
Sign 21
Drive Totem 2
BOL
BOL
DOT
DOT
DOT
LP
Sign 14
Double Sided Banner Unit
DK
LP
LP
LP
LP
LP
LP
LP
LP
LP
1
2
FF
4
DOT
DOT
Transport &
Infrastructure
Consultants
15 St Paul's Street
Second Floor
Leeds
LS1 2JG
www.amatp.co.uk
Project:
PERTH ROAD, BLAIRGOWRIE
Client:
MCDONALD'S RESTAURANT LTD
Drawing:
9.595m REFUSE VEHICLE SWEPT
PATH ANALYSIS
AMA-55002-ATR005-2.5
Drawing No.
P02
Rev.
Drawn By:
Checked:
Date:
Scale:
26.06.2025CF
JH 1:250 A3
P01 Preliminary Issue 13.06.25 JH
Paper:
P02 Updated Site Layout 26.06.25 CF

Page 109

APPENDIX C
SITE ACCESS JUNCTION AND VISIBILITY SPLAY

Page 110

DOT
LP
743920N
743900N
RS
PRS1MH
Y001
MH
Y001
LP
PLP1
GU
Y001
MH
Y001
LP
PLP1
RS
PRS1
2.4mBY 43m VISIBILITY SPLAY
DOT
DOT
DOT
DOT
DOT
DOT
DOT
DOT
DOT
DOT
LP
LP
DOT
Kerb set at
25mm from
ground level
1
2
ST04
MH
Y001
LP
PLP1GU
Y001
MH
Y001
GU
Y001
LP
PLP1
GU
Y001
RS
PRS1
LP
PLP1
879K001
2.4m BY 43m VISIBILITY SPLAY
Transport &
Infrastructure
Consultants
15 St Paul's Street
Second Floor
Leeds
LS1 2JG
www.amatp.co.uk
Project:
PERTH ROAD, BLAIRGOWRIE
Client:
MCDONALD'S RESTAURANT LTD
Drawing:
SITE ACCESS VISIBILITY SPLAY
AMA-55002-SK003
Drawing No.
P01
Rev.
Drawn By:
Checked:
Date:
Scale:
10.02.2025EP
JH 1:250 A3
P01 Preliminary Issue 10.02.2025 EP
Paper:

Page 111

APPENDIX D
TRICS OUTPUTS

Page 112

TRICS 7.11.2  150624 B22.0910024229  Database right of TRICS Consortium Ltd, 2024. All rights reserved Friday  16/08/24
Page  1
AMA     -     Leeds Licence No: 710001
Calculation Reference: AUDIT-710001-240816-0842
TRIP RATE CALCULATION SELECTION PARAMETERS:
Land Use :  06 - HOTEL, FOOD & DRINK
Category :  D - FAST FOOD - DRIVE THROUGH
TOTAL VEHICLES
Selected regions and areas:
04 EAST ANGLIA
CA CAMBRIDGESHIRE 1 days
05 EAST MIDLANDS
LN LINCOLNSHIRE 2 days
NN NORTH NORTHAMPTONSHIRE 1 days
07 YORKSHIRE & NORTH LINCOLNSHIRE
BY BARNSLEY 1 days
08 NORTH WEST
MS MERSEYSIDE 1 days
09 NORTH
TV TEES VALLEY 1 days
10 WALES
VG VALE OF GLAMORGAN 1 days
11 SCOTLAND
AD ABERDEEN CITY 1 days
This section displays the number of survey days per TRICS® sub-region in the selected set

Page 113

TRICS 7.11.2  150624 B22.0910024229  Database right of TRICS Consortium Ltd, 2024. All rights reserved Friday  16/08/24
Page  2
AMA     -     Leeds Licence No: 710001
Primary Filtering selection:
This data displays the chosen trip rate parameter and its selected range. Only sites that fall within the parameter range
are included in the trip rate calculation.
Parameter: Gross floor area
Actual Range: 230 to 690 (units: sqm)
Range Selected by User: 182 to 800 (units: sqm)
Parking Spaces Range: All Surveys Included
Public Transport Provision:
Selection by: Include all surveys
Date Range: 01/01/16 to 25/05/23
This data displays the range of survey dates selected. Only surveys that were conducted within this date range are
included in the trip rate calculation.
Selected survey days:
Tuesday 3 days
Wednesday 1 days
Thursday 2 days
Friday 3 days
This data displays the number of selected surveys by day of the week.
Selected survey types:
Manual count 9 days
Directional ATC Count 0 days
This data displays the number of manual classified surveys and the number of unclassified ATC surveys, the total adding
up to the overall number of surveys in the selected set. Manual surveys are undertaken using staff, whilst ATC surveys
are undertaking using machines.
Selected Locations:
Edge of Town Centre 4
Suburban Area (PPS6 Out of Centre) 2
Edge of Town 3
This data displays the number of surveys per main location category within the selected set. The main location categories
consist of Free Standing, Edge of Town, Suburban Area, Neighbourhood Centre, Edge of Town Centre, Town Centre and
Not Known.
Selected Location Sub Categories:
Industrial Zone 2
Development Zone 1
Residential Zone 1
Retail Zone 2
Built-Up Zone 2
No Sub Category 1
This data displays the number of surveys per location sub-category within the selected set. The location sub-categories
consist of Commercial Zone, Industrial Zone, Development Zone, Residential Zone, Retail Zone, Built-Up Zone, Village,
Out of Town, High Street and No Sub Category.
Inclusion of Servicing Vehicles Counts:
Servicing vehicles Included 7 days - Selected
Servicing vehicles Excluded 10 days - Selected
Secondary Filtering selection:
Use Class:
Not Known  9 days
This data displays the number of surveys per Use Class classification within the selected set. The Use Classes Order
(England) 2020 has been used for this purpose, which can be found within the Library module of TRICS®.
Population within 500m Range:
All Surveys Included

Page 114

TRICS 7.11.2  150624 B22.0910024229  Database right of TRICS Consortium Ltd, 2024. All rights reserved Friday  16/08/24
Page  3
AMA     -     Leeds Licence No: 710001
Secondary Filtering selection (Cont.):
Population within 1 mile:
1,001  to 5,000 1 days
5,001  to 10,000 1 days
10,001 to 15,000 1 days
15,001 to 20,000 2 days
20,001 to 25,000 1 days
25,001 to 50,000 2 days
50,001 to 100,000 1 days
This data displays the number of selected surveys within stated 1-mile radii of population.
Population within 5 miles:
50,001  to 75,000 1 days
75,001  to 100,000 1 days
100,001 to 125,000 1 days
125,001 to 250,000 5 days
250,001 to 500,000 1 days
This data displays the number of selected surveys within stated 5-mile radii of population.
Car ownership within 5 miles:
0.6 to 1.0 6 days
1.1 to 1.5 3 days
This data displays the number of selected surveys within stated ranges of average cars owned per residential dwelling,
within a radius of 5-miles of selected survey sites.
Travel Plan:
No 9 days
This data displays the number of surveys within the selected set that were undertaken at sites with Travel Plans in place,
and the number of surveys that were undertaken at sites without Travel Plans.
PTAL Rating:
No PTAL Present 9 days
This data displays the number of selected surveys with PTAL Ratings.
Covid-19 Restrictions Yes At least one survey within the selected data set
was undertaken at a time of Covid-19 restrictions

Page 115

TRICS 7.11.2  150624 B22.0910024229  Database right of TRICS Consortium Ltd, 2024. All rights reserved Friday  16/08/24
Page  4
AMA     -     Leeds Licence No: 710001
LIST OF SITES relevant to selection parameters
1 AD-06-D-01 MCDONALD’S ABERDEEN CITY
BEDFORD ROAD
ABERDEEN
KITTYBREWSTER RET. PK
Edge of Town Centre
Retail Zone
Total Gross floor area:   4 7 2 sqm
Survey date: TUESDAY 19/11/19 Survey Type: MANUAL
2 BY-06-D-02 MCDONALD'S BARNSLEY
UPPER NEW STREET
BARNSLEY
Edge of Town Centre
Built-Up Zone
Total Gross floor area:   4 1 5 sqm
Survey date: TUESDAY 08/09/20 Survey Type: MANUAL
3 CA-06-D-02 MCDONALD'S CAMBRIDGESHIRE
NEWMARKET ROAD
CAMBRIDGE
Suburban Area (PPS6 Out of Centre)
Residential Zone
Total Gross floor area:   4 3 5 sqm
Survey date: TUESDAY 19/09/17 Survey Type: MANUAL
4 LN-06-D-01 MCDONALD'S LINCOLNSHIRE
RUSTON WAY
LINCOLN
Edge of Town Centre
Built-Up Zone
Total Gross floor area:   4 3 5 sqm
Survey date: FRIDAY 28/06/19 Survey Type: MANUAL
5 LN-06-D-02 MCDONALD'S LINCOLNSHIRE
RYHALL ROAD
STAMFORD
Edge of Town
Retail Zone
Total Gross floor area:   4 9 0 sqm
Survey date: WEDNESDAY 13/10/21 Survey Type: MANUAL
6 MS-06-D-01 MCDONALD'S MERSEYSIDE
SAINT HELENS LINKWAY
SAINT HELENS
Suburban Area (PPS6 Out of Centre)
No Sub Category
Total Gross floor area:   4 6 3 sqm
Survey date: FRIDAY 16/04/21 Survey Type: MANUAL
7 NN-06-D-01 MCDONALD'S NORTH NORTHAMPTONSHIRE
LITTLE COLLIERS FIELD
CORBY
GREAT OAKLEY
Edge of Town
Development Zone
Total Gross floor area:   6 9 0 sqm
Survey date: THURSDAY 16/06/22 Survey Type: MANUAL
8 TV-06-D-01 MCDONALD'S TEES VALLEY
BURN ROAD
HARTLEPOOL
Edge of Town Centre
Industrial Zone
Total Gross floor area:   4 0 0 sqm
Survey date: FRIDAY 04/09/20 Survey Type: MANUAL

Page 116

TRICS 7.11.2  150624 B22.0910024229  Database right of TRICS Consortium Ltd, 2024. All rights reserved Friday  16/08/24
Page  5
AMA     -     Leeds Licence No: 710001
LIST OF SITES relevant to selection parameters (Cont.)
9 VG-06-D-01 MCDONALD'S VALE OF GLAMORGAN
CARDIFF ROAD
BARRY
Edge of Town
Industrial Zone
Total Gross floor area:   4 0 5 sqm
Survey date: THURSDAY 24/09/20 Survey Type: MANUAL
This section provides a list of all survey sites and days in the selected set. For each individual survey site, it displays a
unique site reference code and site address, the selected trip rate calculation parameter and its value, the day of the
week and date of each survey, and whether the survey was a manual classified count or an ATC count.
MANUALLY DESELECTED SURVEYS
Site Ref Survey Date Reason for Deselection
AD-06-D-02 22/11/19 Not McDonalds
FI-06-D-02 22/03/16 Not McDonalds
HC-06-D-03 23/05/23 Not McDonalds
IW-06-D-01 22/05/23 Not McDonalds
NS-06-D-01 15/09/22 Not McDonalds
WM-06-D-04 19/10/22 Not McDonalds
WO-06-D-01 02/10/20 Not McDonalds
WS-06-D-02 25/05/23 Not McDonalds

Page 117

TRICS 7.11.2  150624 B22.0910024229  Database right of TRICS Consortium Ltd, 2024. All rights reserved Friday  16/08/24
Page  6
AMA     -     Leeds Licence No: 710001
TRIP RATE for Land Use 06 - HOTEL, FOOD & DRINK/D - FAST FOOD - DRIVE THROUGH
TOTAL VEHICLES
Calculation factor: 100 sqm
BOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALS
No. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days GFA Rate Days GFA Rate Days GFA Rate
00:00 - 01:00
01:00 - 02:00
02:00 - 03:00
03:00 - 04:00
04:00 - 05:00
1 490 0.204 1 490 0.000 1 490 0.20405:00 - 06:00
7 476 5.997 7 476 5.217 7 476 11.21406:00 - 07:00
8 471 11.777 8 471 10.398 8 471 22.17507:00 - 08:00
8 471 14.297 8 471 13.501 8 471 27.79808:00 - 09:00
8 471 15.252 8 471 15.146 8 471 30.39809:00 - 10:00
9 467 16.005 9 467 15.743 9 467 31.74810:00 - 11:00
9 467 15.767 9 467 15.006 9 467 30.77311:00 - 12:00
9 467 20.690 9 467 20.095 9 467 40.78512:00 - 13:00
9 467 20.166 9 467 20.690 9 467 40.85613:00 - 14:00
9 467 15.553 9 467 15.981 9 467 31.53414:00 - 15:00
9 467 18.716 9 467 17.836 9 467 36.55215:00 - 16:00
9 467 19.049 9 467 19.881 9 467 38.93016:00 - 17:00
9 467 20.927 9 467 20.951 9 467 41.87817:00 - 18:00
9 467 20.904 9 467 21.879 9 467 42.78318:00 - 19:00
9 467 16.528 9 467 17.551 9 467 34.07919:00 - 20:00
9 467 14.625 9 467 15.458 9 467 30.08320:00 - 21:00
9 467 11.986 9 467 12.152 9 467 24.13821:00 - 22:00
7 471 10.552 7 471 11.128 7 471 21.68022:00 - 23:00
7 471 5.397 7 471 6.155 7 471 11.55223:00 - 24:00
Total Rates: 274.392 274.768 549.160
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown just
above the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivals
plus departures). Within each of these main columns are three sub-columns. These display the number of survey days
where count data is included (per time period), the average value of the selected trip rate calculation parameter (per
time period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at the
foot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey days
that have count data available for the stated time period. The average (mean) number of arrivals, departures or totals
(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the stated
time period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the stated
calculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Trip
rates are then rounded to 3 decimal places.
The survey data, graphs and all associated supporting information, contained within the TRICS Database are published
by TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this published
work. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy the
data contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrights
and other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.
[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 230 - 690 (units: sqm)
Survey date date range: 01/01/16 - 25/05/23
Number of weekdays (Monday-Friday): 17
Number of Saturdays: 0
Number of Sundays: 0
Surveys automatically removed from selection: 8
Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip rate
calculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximum
survey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set of
surveys are show.  Finally, the number of survey days that have been manually removed from the selected set outside of
the standard filtering procedure are displayed.

Page 118

TRICS 7.11.2  150624 B22.0910024229  Database right of TRICS Consortium Ltd, 2024. All rights reserved Friday  16/08/24
Page  1
AMA     -     Leeds Licence No: 710001
Calculation Reference: AUDIT-710001-240816-0845
TRIP RATE CALCULATION SELECTION PARAMETERS:
Land Use :  06 - HOTEL, FOOD & DRINK
Category :  D - FAST FOOD - DRIVE THROUGH
TOTAL VEHICLES
Selected regions and areas:
03 SOUTH WEST
GS GLOUCESTERSHIRE 1 days
TB TORBAY 1 days
This section displays the number of survey days per TRICS® sub-region in the selected set

Page 119

TRICS 7.11.2  150624 B22.0910024229  Database right of TRICS Consortium Ltd, 2024. All rights reserved Friday  16/08/24
Page  2
AMA     -     Leeds Licence No: 710001
Primary Filtering selection:
This data displays the chosen trip rate parameter and its selected range. Only sites that fall within the parameter range
are included in the trip rate calculation.
Parameter: Gross floor area
Actual Range: 225 to 447 (units: sqm)
Range Selected by User: 182 to 800 (units: sqm)
Parking Spaces Range: All Surveys Included
Public Transport Provision:
Selection by: Include all surveys
Date Range: 01/01/16 to 25/05/23
This data displays the range of survey dates selected. Only surveys that were conducted within this date range are
included in the trip rate calculation.
Selected survey days:
Saturday 2 days
This data displays the number of selected surveys by day of the week.
Selected survey types:
Manual count 2 days
Directional ATC Count 0 days
This data displays the number of manual classified surveys and the number of unclassified ATC surveys, the total adding
up to the overall number of surveys in the selected set. Manual surveys are undertaken using staff, whilst ATC surveys
are undertaking using machines.
Selected Locations:
Suburban Area (PPS6 Out of Centre) 1
Edge of Town 1
This data displays the number of surveys per main location category within the selected set. The main location categories
consist of Free Standing, Edge of Town, Suburban Area, Neighbourhood Centre, Edge of Town Centre, Town Centre and
Not Known.
Selected Location Sub Categories:
Retail Zone 1
Out of Town 1
This data displays the number of surveys per location sub-category within the selected set. The location sub-categories
consist of Commercial Zone, Industrial Zone, Development Zone, Residential Zone, Retail Zone, Built-Up Zone, Village,
Out of Town, High Street and No Sub Category.
Inclusion of Servicing Vehicles Counts:
Servicing vehicles Included X days - Selected
Servicing vehicles Excluded 2 days - Selected
Secondary Filtering selection:
Use Class:
Not Known  2 days
This data displays the number of surveys per Use Class classification within the selected set. The Use Classes Order
(England) 2020 has been used for this purpose, which can be found within the Library module of TRICS®.
Population within 500m Range:
All Surveys Included
Population within 1 mile:
1,001  to 5,000 1 days
20,001 to 25,000 1 days
This data displays the number of selected surveys within stated 1-mile radii of population.

Page 120

TRICS 7.11.2  150624 B22.0910024229  Database right of TRICS Consortium Ltd, 2024. All rights reserved Friday  16/08/24
Page  3
AMA     -     Leeds Licence No: 710001
Secondary Filtering selection (Cont.):
Population within 5 miles:
125,001 to 250,000 2 days
This data displays the number of selected surveys within stated 5-mile radii of population.
Car ownership within 5 miles:
1.1 to 1.5 2 days
This data displays the number of selected surveys within stated ranges of average cars owned per residential dwelling,
within a radius of 5-miles of selected survey sites.
Travel Plan:
No 2 days
This data displays the number of surveys within the selected set that were undertaken at sites with Travel Plans in place,
and the number of surveys that were undertaken at sites without Travel Plans.
PTAL Rating:
No PTAL Present 2 days
This data displays the number of selected surveys with PTAL Ratings.
Covid-19 Restrictions Yes At least one survey within the selected data set
was undertaken at a time of Covid-19 restrictions

Page 121

TRICS 7.11.2  150624 B22.0910024229  Database right of TRICS Consortium Ltd, 2024. All rights reserved Friday  16/08/24
Page  4
AMA     -     Leeds Licence No: 710001
LIST OF SITES relevant to selection parameters
1 GS-06-D-01 MCDONALD'S GLOUCESTERSHIRE
BRISTOL ROAD
GLOUCESTER
HARDWICKE
Edge of Town
Out of Town
Total Gross floor area:   2 2 5 sqm
Survey date: SATURDAY 24/04/21 Survey Type: MANUAL
2 TB-06-D-01 MCDONALD'S TORBAY
HELE ROAD
TORQUAY
Suburban Area (PPS6 Out of Centre)
Retail Zone
Total Gross floor area:   4 4 7 sqm
Survey date: SATURDAY 30/03/19 Survey Type: MANUAL
This section provides a list of all survey sites and days in the selected set. For each individual survey site, it displays a
unique site reference code and site address, the selected trip rate calculation parameter and its value, the day of the
week and date of each survey, and whether the survey was a manual classified count or an ATC count.

Page 122

TRICS 7.11.2  150624 B22.0910024229  Database right of TRICS Consortium Ltd, 2024. All rights reserved Friday  16/08/24
Page  5
AMA     -     Leeds Licence No: 710001
TRIP RATE for Land Use 06 - HOTEL, FOOD & DRINK/D - FAST FOOD - DRIVE THROUGH
TOTAL VEHICLES
Calculation factor: 100 sqm
BOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALS
No. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days GFA Rate Days GFA Rate Days GFA Rate
00:00 - 01:00
01:00 - 02:00
02:00 - 03:00
03:00 - 04:00
04:00 - 05:00
05:00 - 06:00
1 225 19.111 1 225 17.778 1 225 36.88906:00 - 07:00
2 336 21.875 2 336 21.280 2 336 43.15507:00 - 08:00
2 336 25.000 2 336 23.363 2 336 48.36308:00 - 09:00
2 336 32.292 2 336 30.060 2 336 62.35209:00 - 10:00
2 336 27.083 2 336 29.464 2 336 56.54710:00 - 11:00
2 336 27.232 2 336 24.256 2 336 51.48811:00 - 12:00
2 336 37.946 2 336 36.905 2 336 74.85112:00 - 13:00
2 336 34.970 2 336 35.119 2 336 70.08913:00 - 14:00
2 336 32.292 2 336 34.673 2 336 66.96514:00 - 15:00
2 336 28.423 2 336 29.911 2 336 58.33415:00 - 16:00
2 336 30.208 2 336 28.869 2 336 59.07716:00 - 17:00
2 336 32.589 2 336 33.036 2 336 65.62517:00 - 18:00
2 336 33.333 2 336 33.631 2 336 66.96418:00 - 19:00
2 336 28.274 2 336 31.845 2 336 60.11919:00 - 20:00
2 336 24.107 2 336 23.363 2 336 47.47020:00 - 21:00
2 336 20.238 2 336 20.238 2 336 40.47621:00 - 22:00
2 336 16.071 2 336 15.327 2 336 31.39822:00 - 23:00
2 336 13.542 2 336 13.393 2 336 26.93523:00 - 24:00
Total Rates: 484.586 482.511 967.097
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown just
above the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivals
plus departures). Within each of these main columns are three sub-columns. These display the number of survey days
where count data is included (per time period), the average value of the selected trip rate calculation parameter (per
time period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at the
foot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey days
that have count data available for the stated time period. The average (mean) number of arrivals, departures or totals
(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the stated
time period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the stated
calculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Trip
rates are then rounded to 3 decimal places.
The survey data, graphs and all associated supporting information, contained within the TRICS Database are published
by TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this published
work. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy the
data contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrights
and other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.
[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 225 - 447 (units: sqm)
Survey date date range: 01/01/16 - 25/05/23
Number of weekdays (Monday-Friday): 0
Number of Saturdays: 2
Number of Sundays: 0
Surveys automatically removed from selection: 0
Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip rate
calculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximum
survey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set of
surveys are show.  Finally, the number of survey days that have been manually removed from the selected set outside of
the standard filtering procedure are displayed.

Page 123

APPENDIX E 
MODELLING OUTPUTS

Page 124

Filename: A93 North Access Junction.j9
Path: C:\AMA\AMA\AMA - McDonald's\003 - North\55002 - Perth Road, Blairgowie\D Models and Drawings\PICADY
Report generation date: 22/11/2024 13:48:33 
»2024, AM
»2024, PM
»2024 , Saturday IP
»2029, AM
»2029, PM
»2029, Saturday IP
»2029 Do Something, AM
»2029 Do Something, PM
»2029 Do Something, Saturday IP
Summary of junction performance 
Junctions 9
PICADY 9 - Priority Intersection Module
Version: 9.5.1.7462 
© Copyright TRL Limited, 2019
For sales and distribution information, program advice and maintenance, contact TRL:
+44 (0)1344 379777     software@trl.co.uk     www.trlsoftware.co.uk
The users of this computer program for the solution of an engineering problem are in no way relieved of their responsibility for the correctness of the
solution
 
AM PM Saturday IP
 
Set ID Queue (PCU) Delay (s) RFC LOS Set ID Queue (PCU) Delay (s) RFC LOS Set ID Queue (PCU) Delay (s) RFC LOS
 
2024
Stream B-AC
D1
0.0 7.59 0.03 A
D2
0.0 0.00 0.00 A
D3
0.0 6.23 0.01 A
Stream C-AB 0.0 5.08 0.03 A 0.0 4.86 0.01 A 0.0 4.88 0.01 A
 
2029
Stream B-AC
D4
0.0 7.92 0.03 A
D5
0.0 0.00 0.00 A
D6
0.0 6.46 0.01 A
Stream C-AB 0.0 4.85 0.03 A 0.0 4.77 0.01 A 0.0 4.68 0.02 A
 
2029 Do Something
Stream B-AC
D7
0.1 8.77 0.12 A
D8
0.4 11.91 0.27 B
D9
0.4 11.50 0.29 B
Stream C-AB 0.2 5.10 0.10 A 0.5 5.57 0.21 A 0.6 5.53 0.23 A
Values shown are the highest values encountered over all time segments. Delay is the maximum value of average delay per arriving vehicle.
Generated on 22/11/2024 13:49:34 using Junctions 9 (9.5.1.7462)
1

Page 125

File summary
Units
Analysis Options
Demand Set Summary
Analysis Set Details
File Description
Title  
Location  
Site number  
Date 20/08/2024
Version  
Status (new file)
Identifier  
Client  
Jobnumber  
Enumerator AzureAD\Modellinglaptop
Description  
Distance units Speed units Traffic units input Traffic units results Flow units Average delay units Total delay units Rate of delay units
m kph PCU PCU perHour s -Min perMin
Calculate Queue Percentiles Calculate residual capacity RFC Threshold Average Delay threshold (s) Queue threshold (PCU)
 
 
0.85 36.00 20.00
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time segment length (min)
D1 2024 AM ONE HOUR 09:45 11:15 15
D2 2024 PM ONE HOUR 16:45 18:15 15
D3 2024 Saturday IP ONE HOUR 11:45 13:15 15
D4 2029 AM ONE HOUR 09:45 11:15 15
D5 2029 PM ONE HOUR 16:45 18:15 15
D6 2029 Saturday IP ONE HOUR 11:45 13:15 15
D7 2029 Do Something AM ONE HOUR 09:45 11:15 15
D8 2029 Do Something PM ONE HOUR 16:45 18:15 15
D9 2029 Do Something Saturday IP ONE HOUR 11:45 13:15 15
ID Network flow scaling factor (%)
A1 100.000
Generated on 22/11/2024 13:49:34 using Junctions 9 (9.5.1.7462)
2

Page 126

2024, AM
Data Errors and Warnings
No errors or warnings
Junction Network
Junctions
Junction Network Options
Arms
Arms
Major Arm Geometry
Geometries for Arm C are measured opposite Arm B. Geometries for Arm A (if relevant) are measured opposite Arm D.
Minor Arm Geometry
Slope / Intercept / Capacity
Priority Intersection Slopes and Intercepts
The slopes and intercepts shown above do NOT include any corrections or adjustments.
Streams may be combined, in which case capacity will be adjusted.
Values are shown for the first time segment only; they may differ for subsequent time segments.
Traffic Demand
Demand Set Details 
Junction Name Junction type Major road direction Use circulating lanes Junction Delay (s) Junction LOS
1 A93 Perth Road / North Access T-Junction Two-way   0.29 A
Driving side Lighting
Left Normal/unknown
Arm Name Description Arm type
A A93 South   Major
B North Access   Minor
C A93 North   Major
Arm Width of carriageway (m) Has kerbed central reserve Has right turn bay Visibility for right turn (m) Blocks? Blocking queue (PCU)
C 7.11     160.0 ü 0.00
Arm Minor arm type Lane width (m) Visibility to left (m) Visibility to right (m)
B One lane 2.80 50 110
Stream Intercept
(PCU/hr)
Slope
for
A-B
Slope
for
A-C
Slope
for
C-A
Slope
for
C-B
B-A 537 0.093 0.235 0.148 0.336
B-C 679 0.099 0.250 - -
C-B 667 0.246 0.246 - -
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time segment length (min)
D1 2024 AM ONE HOUR 09:45 11:15 15
Generated on 22/11/2024 13:49:34 using Junctions 9 (9.5.1.7462)
3

Page 127

Demand overview (Traffic)
Origin-Destination Data
Vehicle Mix
Results
Results Summary for whole modelled period 
Vehicle mix source PCU Factor for a HV (PCU)
HV Percentages 2.00
Arm Linked arm Use O-D data Average Demand (PCU/hr) Scaling Factor (%)
A   ü 317 100.000
B   ü 13 100.000
C   ü 297 100.000
Demand (PCU/hr)
 
To
From
 
 
A   B   C 
 
A  0 6 311
 
B  5 0 8
 
C  286 11 0
Heavy Vehicle Percentages
 
To
From
 
 
A   B   C 
 
A  0 6 3
 
B  9 0 0
 
C  3 5 0
Stream Max RFC Max Delay (s) Max Queue (PCU) Max LOS
B-AC 0.03 7.59 0.0 A
C-AB 0.03 5.08 0.0 A
C-A        
A-B        
A-C        
Generated on 22/11/2024 13:49:34 using Junctions 9 (9.5.1.7462)
4

Page 128

2024, PM
Data Errors and Warnings
No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details 
Demand overview (Traffic)
Origin-Destination Data
Vehicle Mix
Junction Name Junction type Major road direction Use circulating lanes Junction Delay (s) Junction LOS
1 A93 Perth Road / North Access T-Junction Two-way   0.02 A
Driving side Lighting
Left Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time segment length (min)
D2 2024 PM ONE HOUR 16:45 18:15 15
Vehicle mix source PCU Factor for a HV (PCU)
HV Percentages 2.00
Arm Linked arm Use O-D data Average Demand (PCU/hr) Scaling Factor (%)
A   ü 436 100.000
B   ü 3 100.000
C   ü 375 100.000
Demand (PCU/hr)
 
To
From
 
 
A   B   C 
 
A  0 2 434
 
B  0 0 3
 
C  373 2 0
Heavy Vehicle Percentages
 
To
From
 
 
A   B   C 
 
A  0 6 3
 
B  9 0 0
 
C  3 5 0
Generated on 22/11/2024 13:49:34 using Junctions 9 (9.5.1.7462)
5

Page 129

Results
Results Summary for whole modelled period 
Stream Max RFC Max Delay (s) Max Queue (PCU) Max LOS
B-AC 0.00 0.00 0.0 A
C-AB 0.01 4.86 0.0 A
C-A        
A-B        
A-C        
Generated on 22/11/2024 13:49:34 using Junctions 9 (9.5.1.7462)
6

Page 130

2024 , Saturday IP
Data Errors and Warnings
No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details 
Demand overview (Traffic)
Origin-Destination Data
Vehicle Mix
Junction Name Junction type Major road direction Use circulating lanes Junction Delay (s) Junction LOS
1 A93 Perth Road / North Access T-Junction Two-way   0.11 A
Driving side Lighting
Left Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time segment length (min)
D3 2024 Saturday IP ONE HOUR 11:45 13:15 15
Vehicle mix source PCU Factor for a HV (PCU)
HV Percentages 2.00
Arm Linked arm Use O-D data Average Demand (PCU/hr) Scaling Factor (%)
A   ü 351 100.000
B   ü 5 100.000
C   ü 355 100.000
Demand (PCU/hr)
 
To
From
 
 
A   B   C 
 
A  0 6 345
 
B  0 0 5
 
C  349 6 0
Heavy Vehicle Percentages
 
To
From
 
 
A   B   C 
 
A  0 6 3
 
B  9 0 0
 
C  3 5 0
Generated on 22/11/2024 13:49:34 using Junctions 9 (9.5.1.7462)
7

Page 131

Results
Results Summary for whole modelled period 
Stream Max RFC Max Delay (s) Max Queue (PCU) Max LOS
B-AC 0.01 6.23 0.0 A
C-AB 0.01 4.88 0.0 A
C-A        
A-B        
A-C        
Generated on 22/11/2024 13:49:34 using Junctions 9 (9.5.1.7462)
8

Page 132

2029, AM
Data Errors and Warnings
No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details 
Demand overview (Traffic)
Origin-Destination Data
Vehicle Mix
Junction Name Junction type Major road direction Use circulating lanes Junction Delay (s) Junction LOS
1 A93 Perth Road / North Access T-Junction Two-way   0.26 A
Driving side Lighting
Left Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time segment length (min)
D4 2029 AM ONE HOUR 09:45 11:15 15
Vehicle mix source PCU Factor for a HV (PCU)
HV Percentages 2.00
Arm Linked arm Use O-D data Average Demand (PCU/hr) Scaling Factor (%)
A   ü 358 100.000
B   ü 13 100.000
C   ü 381 100.000
Demand (PCU/hr)
 
To
From
 
 
A   B   C 
 
A  0 6 352
 
B  5 0 8
 
C  370 11 0
Heavy Vehicle Percentages
 
To
From
 
 
A   B   C 
 
A  0 6 3
 
B  9 0 0
 
C  3 5 0
Generated on 22/11/2024 13:49:34 using Junctions 9 (9.5.1.7462)
9

Page 133

Results
Results Summary for whole modelled period 
Stream Max RFC Max Delay (s) Max Queue (PCU) Max LOS
B-AC 0.03 7.92 0.0 A
C-AB 0.03 4.85 0.0 A
C-A        
A-B        
A-C        
Generated on 22/11/2024 13:49:34 using Junctions 9 (9.5.1.7462)
10

Page 134

2029, PM
Data Errors and Warnings
No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details 
Demand overview (Traffic)
Origin-Destination Data
Vehicle Mix
Junction Name Junction type Major road direction Use circulating lanes Junction Delay (s) Junction LOS
1 A93 Perth Road / North Access T-Junction Two-way   0.02 A
Driving side Lighting
Left Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time segment length (min)
D5 2029 PM ONE HOUR 16:45 18:15 15
Vehicle mix source PCU Factor for a HV (PCU)
HV Percentages 2.00
Arm Linked arm Use O-D data Average Demand (PCU/hr) Scaling Factor (%)
A   ü 520 100.000
B   ü 3 100.000
C   ü 426 100.000
Demand (PCU/hr)
 
To
From
 
 
A   B   C 
 
A  0 2 518
 
B  0 0 3
 
C  424 2 0
Heavy Vehicle Percentages
 
To
From
 
 
A   B   C 
 
A  0 6 3
 
B  9 0 0
 
C  3 5 0
Generated on 22/11/2024 13:49:34 using Junctions 9 (9.5.1.7462)
11

Page 135

Results
Results Summary for whole modelled period 
Stream Max RFC Max Delay (s) Max Queue (PCU) Max LOS
B-AC 0.00 0.00 0.0 A
C-AB 0.01 4.77 0.0 A
C-A        
A-B        
A-C        
Generated on 22/11/2024 13:49:34 using Junctions 9 (9.5.1.7462)
12

Page 136

2029, Saturday IP
Data Errors and Warnings
No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details 
Demand overview (Traffic)
Origin-Destination Data
Vehicle Mix
Junction Name Junction type Major road direction Use circulating lanes Junction Delay (s) Junction LOS
1 A93 Perth Road / North Access T-Junction Two-way   0.12 A
Driving side Lighting
Left Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time segment length (min)
D6 2029 Saturday IP ONE HOUR 11:45 13:15 15
Vehicle mix source PCU Factor for a HV (PCU)
HV Percentages 2.00
Arm Linked arm Use O-D data Average Demand (PCU/hr) Scaling Factor (%)
A   ü 423 100.000
B   ü 6 100.000
C   ü 443 100.000
Demand (PCU/hr)
 
To
From
 
 
A   B   C 
 
A  0 6 417
 
B  0 0 6
 
C  436 7 0
Heavy Vehicle Percentages
 
To
From
 
 
A   B   C 
 
A  0 6 3
 
B  9 0 0
 
C  3 5 0
Generated on 22/11/2024 13:49:34 using Junctions 9 (9.5.1.7462)
13

Page 137

Results
Results Summary for whole modelled period 
Stream Max RFC Max Delay (s) Max Queue (PCU) Max LOS
B-AC 0.01 6.46 0.0 A
C-AB 0.02 4.68 0.0 A
C-A        
A-B        
A-C        
Generated on 22/11/2024 13:49:34 using Junctions 9 (9.5.1.7462)
14

Page 138

2029 Do Something, AM
Data Errors and Warnings
No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details 
Demand overview (Traffic)
Origin-Destination Data
Vehicle Mix
Junction Name Junction type Major road direction Use circulating lanes Junction Delay (s) Junction LOS
1 A93 Perth Road / North Access T-Junction Two-way   1.00 A
Driving side Lighting
Left Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time segment length (min)
D7 2029 Do Something AM ONE HOUR 09:45 11:15 15
Vehicle mix source PCU Factor for a HV (PCU)
HV Percentages 2.00
Arm Linked arm Use O-D data Average Demand (PCU/hr) Scaling Factor (%)
A   ü 368 100.000
B   ü 53 100.000
C   ü 411 100.000
Demand (PCU/hr)
 
To
From
 
 
A   B   C 
 
A  0 16 352
 
B  19 0 34
 
C  370 41 0
Heavy Vehicle Percentages
 
To
From
 
 
A   B   C 
 
A  0 6 3
 
B  9 0 0
 
C  3 5 0
Generated on 22/11/2024 13:49:34 using Junctions 9 (9.5.1.7462)
15

Page 139

Results
Results Summary for whole modelled period 
Stream Max RFC Max Delay (s) Max Queue (PCU) Max LOS
B-AC 0.12 8.77 0.1 A
C-AB 0.10 5.10 0.2 A
C-A        
A-B        
A-C        
Generated on 22/11/2024 13:49:34 using Junctions 9 (9.5.1.7462)
16

Page 140

2029 Do Something, PM
Data Errors and Warnings
No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details 
Demand overview (Traffic)
Origin-Destination Data
Vehicle Mix
Junction Name Junction type Major road direction Use circulating lanes Junction Delay (s) Junction LOS
1 A93 Perth Road / North Access T-Junction Two-way   1.77 A
Driving side Lighting
Left Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time segment length (min)
D8 2029 Do Something PM ONE HOUR 16:45 18:15 15
Vehicle mix source PCU Factor for a HV (PCU)
HV Percentages 2.00
Arm Linked arm Use O-D data Average Demand (PCU/hr) Scaling Factor (%)
A   ü 544 100.000
B   ü 103 100.000
C   ü 497 100.000
Demand (PCU/hr)
 
To
From
 
 
A   B   C 
 
A  0 26 518
 
B  35 0 68
 
C  424 73 0
Heavy Vehicle Percentages
 
To
From
 
 
A   B   C 
 
A  0 6 3
 
B  9 0 0
 
C  3 5 0
Generated on 22/11/2024 13:49:34 using Junctions 9 (9.5.1.7462)
17

Page 141

Results
Results Summary for whole modelled period 
Stream Max RFC Max Delay (s) Max Queue (PCU) Max LOS
B-AC 0.27 11.91 0.4 B
C-AB 0.21 5.57 0.5 A
C-A        
A-B        
A-C        
Generated on 22/11/2024 13:49:34 using Junctions 9 (9.5.1.7462)
18

Page 142

2029 Do Something, Saturday IP
Data Errors and Warnings
No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details 
Demand overview (Traffic)
Origin-Destination Data
Vehicle Mix
Junction Name Junction type Major road direction Use circulating lanes Junction Delay (s) Junction LOS
1 A93 Perth Road / North Access T-Junction Two-way   2.07 A
Driving side Lighting
Left Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time segment length (min)
D9 2029 Do Something Saturday IP ONE HOUR 11:45 13:15 15
Vehicle mix source PCU Factor for a HV (PCU)
HV Percentages 2.00
Arm Linked arm Use O-D data Average Demand (PCU/hr) Scaling Factor (%)
A   ü 449 100.000
B   ü 117 100.000
C   ü 519 100.000
Demand (PCU/hr)
 
To
From
 
 
A   B   C 
 
A  0 32 417
 
B  39 0 78
 
C  436 83 0
Heavy Vehicle Percentages
 
To
From
 
 
A   B   C 
 
A  0 6 3
 
B  9 0 0
 
C  3 5 0
Generated on 22/11/2024 13:49:34 using Junctions 9 (9.5.1.7462)
19

Page 143

Results
Results Summary for whole modelled period 
Stream Max RFC Max Delay (s) Max Queue (PCU) Max LOS
B-AC 0.29 11.50 0.4 B
C-AB 0.23 5.53 0.6 A
C-A        
A-B        
A-C        
Generated on 22/11/2024 13:49:34 using Junctions 9 (9.5.1.7462)
20

Page 144

All rights are reserved. Copyright © 2024
Andrew Moseley Associates, 15 St Paul’s Street, Leeds, LS1 2JG 
www.amatp.co.uk
info@amatp.co.uk

Page 145

REPORT NO 55002-002 
PROPOSED MCDONALD’S DRIVE-
THRU, PERTH ROAD, BLAIRGOWRIE 
INTERIM TRAVEL PLAN 
JUNE 2025

Page 146

Final Issue
Project no: 55002-002
Date: June 2025 
Andrew Moseley Associates
51A St Paul’s Street 
Leeds, LS1 2TE 
www.amatp.co.uk 
info@amatp.co.uk 
PROPOSED MCDONALD’S
DRIVE-THRU, PERTH ROAD,
BLAIRGOWRIE
INTERIM TRAVEL PLAN 
McDonald’s Restaurants Ltd

Page 147

QUALITY MANAGEMENT 
First Issue Revision 1 Revision 2 Revision 3
Remarks First Issue   
Date 23.06.25   
Prepared ECT   
Checked JH   
Authorised JH   
PRODUCTION TEAM
AMA 
Principal Transport Planner Jonathan Hazell
Graduate Transport Planner Elizabeth Theakston

Page 148

Proposed McDonald’s Drive-Thru Page | i Project No 55002
Perth Road, Blairgowrie June 2025
TABLE OF CONTENTS 
FOREWORD ................................................................................................................................. 1
1 INTRODUCTION ................................................................................................................. 2
1.1 OVERVIEW ................................................................................................................. 2
1.2 SITE LOCATION ........................................................................................................ 2
1.3 PROPOSED DEVELOPMENT ................................................................................. 2
1.4 AIMS AND OBJECTIVES ......................................................................................... 2
2 STAFF TRAVEL INFORMATION ..................................................................................... 4
3 TRAVEL PLAN CO-ORDINATOR .................................................................................... 6
4 EXISTING SUSTAINABLE TRANSPORT PROVISION ................................................. 7
4.1 INTRODUCTION....................................................................................................... 7
4.2 PEDESTRIAN ACCESSIBILITY ................................................................................ 7
4.3 CYCLING ACCESSIBILITY ....................................................................................... 7
4.4 PUBLIC TRANSPORT ............................................................................................... 8
4.5 SUMMARY ................................................................................................................. 8
5 TRAVEL PLAN MEASURES AND ACTION PLAN ........................................................ 9
5.1 TRAVEL PLAN MEASURES ..................................................................................... 9
5.2 ACTION PLAN ......................................................................................................... 11
6 ATTITUDES TO TRAVEL CHANGE ............................................................................... 12
7 MONITORING AND REVIEW ........................................................................................ 14
7.1 MONITORING ......................................................................................................... 14
7.2 TARGETS .................................................................................................................. 14
7.3 REVIEW DEFINITION ............................................................................................ 14
7.4 REVIEW TIMETABLE ............................................................................................. 15
7.5 REVIEW PROCEDURE ........................................................................................... 15

Page 149

Proposed McDonald’s Drive-Thru Page | ii Project No 55002
Perth Road, Blairgowrie June 2025 
8 SUMMARY OF TRAVEL PLAN ....................................................................................... 16
TABLES
Table 2-1 - Survey Travel Modes to Food Store or Retail Park Restaurants
Table 4-1 - Local Bus Services
Table 5-1 - Action Plan for Proposed Travel Plan Measures
Table 6-1 - Staff Attitudes Survey Results
Table 7-1 - Interim Targets
FIGURES
Figure 1 – Site Location Plan
Figure 2 – 2km Walking Isochrone
Figure 3 – Public Rights of Way Map
Figure 4 – 5km Cycling Isochrone
Figure 5 - Bus Stop Location Plan
APPENDICES
Appendix A – Proposed Site Layout
Appendix B – TRICS Output

Page 150

Proposed McDonald’s Drive-Thru Page | 1 Project No 55002
Perth Road, Blairgowrie June 2025
FOREWORD
1.1.1 “If we all can modify our travel habits, even slightly, we can start to make a difference"
1.1.2 We are all aware of the stress that traffic congestion can cause in our everyday personal and working
lives. Poor air quality and noise problems caused by road traffic, affect our living environment.
Research says it will get worse.
1.1.3 The Government has set clear aims for sustainable development. As McDonald’s Restaurants Ltd
continue to develop new and refurbish existing stores, it is an opportunity for a fresh look at the
reasons and travel choices behind the journeys we make.
1.1.4 The proposals in our Travel Plan will help us all to make more informed choices about how we travel
to work. These ideas should help to reduce the strain associated with traveling as well as helping to
encourage a healthier workforce and improving the immediate environment around us.
1.1.5 The key focus of this Travel Plan is to reduce the number of single occupancy car trips made by our
staff, whilst increasing awareness of alternative modes of travel that are available.
1.1.6 As part of the preparation for this Travel Plan, we have undertaken surveys of almost 700 staff from
across the UK in order to learn about their travel habits, and to determine how we can encourage a
shift away from use of the private car.
1.1.7 In order for this Travel Plan to work, it is important to have the commitment of all staff. In most cases,
the Travel Plan for each store will be promoted and maintained by the Restaurant Manager and they
have the full support of McDonald’s Head Office or their Franchisee. All staff are encouraged to enter
fully into the spirit of the Travel Plan so that they can be seen to be making a valuable contribution
to the local area. If we all can modify our travel habits, even slightly, we can start to make a difference.

Page 151

Proposed McDonald’s Drive-Thru Page | 2 Project No 55002
Perth Road, Blairgowrie June 2025 
1 INTRODUCTION
1.1 OVERVIEW
1.1.1 Andrew Moseley Associates (AMA) has been commissioned by McDonald’s Restaurants Ltd to
prepare a Transport Assessment (TA) and Interim Travel Plan (ITP) to accompany a planning
application for the development of a McDonald’s restaurant with a drive-thru off the A93 Perth Road
in Blairgowrie.
1.1.2 The purpose of this document is to set out McDonald’s Restaurants Ltd intention to encourage and
implement proposals, which will result in a reduction in the need for staff to travel by private car to
the McDonald’s restaurant. 
1.2 SITE LOCATION
1.2.1 The proposed site is located approximately 1km south of the centre of Blairgowrie and currently
comprises undeveloped land which is bound to the north and west by further undeveloped land, to
the east by the A93 Perth Road, and to the south by an unnamed access road which leads to a small
retail park. The location of the site is illustrated indicatively at Figure 1.
1.3 PROPOSED DEVELOPMENT
1.3.1 The development proposals are for a 292sqm Gross Internal Area (GIA) McDonald’s restaurant drive-
thru facility, including associated site access, servicing arrangements and parking. It is expected that
the restaurant would operate between 06:00 to 24:00 Monday to Sunday. The proposed site layout
is attached at Appendix A. 
1.3.2 It is expected there would be approximately 55-75 direct full-time equivalent staff employed by the
restaurant. Staff work shifts and the number of staff expected to be on shift at any one time would
be 20 people. McDonald’s staff work varying shift patterns depending on their needs and the
requirements of the restaurant. The minimum core time is four hours.
1.4 AIMS AND OBJECTIVES
1.4.1 The aim of the McDonald’s staff Travel Plan is to make staff aware of the alternative means of
transport available to them to reduce the number of journeys that are made by private car.
1.4.2 The objectives of the Travel Plan are outlined below:
 Reduce staff journeys made by private car;
 Reduce staff demand for parking spaces; 
 Provide clear information on the alternate modes of transport to and from the site;
 Increase travel choice for staff; and
 Increase use of walking, cycling and public transport.

Page 152

Proposed McDonald’s Drive-Thru Page | 3 Project No 55002
Perth Road, Blairgowrie June 2025 
REPORT STRUCTURE
1.4.3 The structure of the report is set out as follows; 
 Section 2 – provides details on staff travel information and patterns;
 Section 3 - provides the details of the Travel Plan Co-ordinator and the responsibilities of this
role; 
 Section 4 - examines the accessibility of the site by sustainable modes of travel and also considers
the accessibility of a range of key services and facilities;
 Section 5 - describes the measures proposed by the TP and an action plan;
 Section 6 - provides evidence on attitudes to travel change;
 Section 7 - sets out the monitoring and review process; and
 Section 8 - provides a summary of the TP.

Page 153

Proposed McDonald’s Drive-Thru Page | 4 Project No 55002
Perth Road, Blairgowrie June 2025 
2 STAFF TRAVEL INFORMATION
2.1.1 McDonald’s Restaurants Limited organised a series of staff questionnaires at the following types of
restaurants:
 Roadside
• Typically located on “A” classification roads, these restaurants cater for the needs of passing
motorists.
 Retail Park
• Located in retail parks of all scales, these provide a facility for shoppers to purchase a meal
whilst they are on an existing shopping trip.
 Suburban
• Sited in or near local shopping centres, to complement the existing retail uses serving a
predominantly residential area.
2.1.2 The surveys have been analysed to produce a database, showing how staff at McDonald’s restaurants
already utilise a wide range of modes of transport to travel to and from work. For the purposes of
this Travel Plan the proposed development has been assessed as a Retail Park restaurant. 
2.1.3 Table 2-1 shows an extract from the database outlining the modal split of staff at restaurants located
in retail parks.
Table 2-1 – Survey Travel Modes to Food Store or Retail Park Restaurants
Mode % Requires Car
Parking
Public Transport,
Pedestrian or Cycle
Foot 11% - 11%
Car Driver (Park at McDonalds) 33% 33% -
Bus 25% - 25%
Dropped Off 14% - -
Cycle (Park at McDonalds) 8% - 8%
Motorcycle (Park at McDonalds) 2% - -
Car Passenger (Share with another employee) 2% - -
Taxi 2% - 2%
Train 3% - 3% 
100% 33% 49%

Page 154

Proposed McDonald’s Drive-Thru Page | 5 Project No 55002
Perth Road, Blairgowrie June 2025 
2.1.4 As shown in Table 2-1, McDonald’s staff already have a low level of car travel at the restaurants
surveyed, with just at 33% driving a car and 2% riding a motorcycle.  Whilst it is accepted that there
may be some minor differences from one site to another, it is reasonable to suggest that around only
a third of McDonald’s staff travel to work by car.
2.1.5 47% travel by public transport, foot or bicycle. 18% arrive as a passenger in a car, with the majority
(14%) being dropped off, which is likely to form part of a linked trip, rather than a specific visit to drop
a friend or colleague at work.
2.1.6 Based upon a daily workforce of 20 people on site would amount to around 7 employees who would
drive to work.

Page 155

Proposed McDonald’s Drive-Thru Page | 6 Project No 55002
Perth Road, Blairgowrie June 2025 
3 TRAVEL PLAN CO-ORDINATOR 
3.1.1 The Travel Plan (TP) Co-ordinator at Perth Road, Blairgowrie will be the Assistant Restaurant
Manager and will be appointed upon occupation of the restaurant. They are the most senior member
of staff and therefore have sufficient influence amongst other employees to promote the measures
within this Travel Plan.
3.1.2 The Travel Plan Co-ordinator retains a copy of this Travel Plan as well as contact details for Andrew
Moseley Associates (AMA) Limited to assist in the implementation and monitoring of this Travel Plan. 
3.1.3 The TP Co-ordinator will provide staff information on the following:
 Walking
• Approximate distances to and from the site from nearby residential areas; and
• The health, financial and environmental benefits associated with walking. 
 Cycling
• A map detailing key cycle infrastructure in the local area;
• Approximate distances to and from the site from nearby residential areas; and
• The health, financial and environmental benefits associated with cycling. 
 Public Transport
• A map identifying the location of local bus stops and the services that operate;
• Links to up-to-date bus timetables including relevant bus apps; and
• Information on Corporate Travel Schemes such as
https://www.stagecoachbus.com/promos-and-offers/national/corporate-travel-scheme.  
 Car Sharing
• Staff will be made aware of the opportunity for car sharing.
3.1.4 All travel information will be updated annually.
3.1.5 Contact details for the Travel Plan Co-ordinator will be forwarded to Perth and Kinross Council one
month prior to first occupation.

Page 156

Proposed McDonald’s Drive-Thru Page | 7 Project No 55002
Perth Road, Blairgowrie June 2025 
4 EXISTING SUSTAINABLE TRANSPORT
PROVISION
4.1 INTRODUCTION
4.1.1 NPF4 states that new developments should be provided in sustainable locations, where the need to
travel is minimised and the use of sustainable modes can be maximised. 
4.1.2 The site has a good level of accessibility and access to sustainable modes of transport within a
reasonable distance of the site. Travel by non-car modes will be encouraged, and the proposals
include pedestrian and cycle infrastructure within the site.
4.1.3 This section outlines the existing walking, cycling and public transport facilities within the vicinity of
the development site and describes the accessibility of the site in terms of its proximity to key
services and destinations.
4.2 PEDESTRIAN ACCESSIBILITY
4.2.1 Walking is considered to be the most important mode of travel at the local level and offers the
greatest potential to replace short car trips, particularly under two kilometres.
4.2.2 Figure 2 shows a 2km walking catchment area from the centre of the site. This demonstrates that the
entirety of Blairgowrie town centre can be accessed within 2km as well as residential areas to the
south and east of the site.
4.2.3 Good quality pedestrian infrastructure surrounds the site. In particular, a lit footway is provided along
both sides of the A93 Perth Road carriageway towards Blairgowrie town centre. A toucan crossing is
provided across the A93 in the vicinity of the site for access to residential areas to the east.
4.2.4 It is considered that customers and staff residing or working in the local area have good opportunities
to travel to the site on foot.
4.3 CYCLING ACCESSIBILITY
4.3.1 In addition to walking, cycling also has potential to substitute for short car trips, particularly those
under 5 kilometres, and to form part of a longer journey by public transport.
4.3.2 Figure 4 shows a 5km cycling catchment area from the centre of the site. This shows that the entirety
of Blairgowrie and Rattray can be accessed as well as surrounding residential areas to the north, south
and east. The areas of Rosemount and Carsie can also be accessed to the east and south of the site
respectively.
4.3.3 Cycle parking will be provided to further encourage and facilitate cycling to and from the site in the
form of three Sheffield stands which can accommodated six cycles.

Page 157

Proposed McDonald’s Drive-Thru Page | 8 Project No 55002
Perth Road, Blairgowrie June 2025 
4.4 PUBLIC TRANSPORT
Bus Facilities
4.4.1 The site well located for access by bus as the closest bus stops are located on the A93 Perth Road to
approximately 70m walking distance from the development entrance offering northbound services
towards Blairgowrie and Rattray and southbound services towards Perth. These bus stops are
provided with a shelter and timetable information. The southbound bus stop benefits from an existing
toucan crossing of the A93.
4.4.2 The bus stops located within the vicinity of the site are shown in Figure 5 and details of the buses
which serve them are provided in Table 4-1. 
Table 4-1 Local Bus Services
Service Route
Approximate Frequency 
Monday – Friday Saturday Sunday
58 Blairgowrie - Perth Up to 6 services
per day
Up to 6 services
per day Every 30 minutes
63 Carsie - Rattray Every 30 minutes Every 30 minutes No service
4.4.3 The services set out within Table 4-1 provide travel to a range of local destinations. Whilst it is less
likely that customers will travel to the site by bus, this forms a reasonable travel mode for employees.
4.5 SUMMARY
4.5.1 This section has shown that it is feasible for employees to walk, cycle and possibly use public
transport from the surrounding residential areas. Given the nature of the proposed use, it is
considered that the location of the site is consistent with national and local policy objectives.

Page 158

Proposed McDonald’s Drive-Thru Page | 9 Project No 55002
Perth Road, Blairgowrie June 2025 
5 TRAVEL PLAN MEASURES AND ACTION PLAN
5.1 TRAVEL PLAN MEASURES
Promotional Strategy 1: Sustainable Travel Noticeboards
5.1.1 Given the nature of the development, staff are unlikely to be desk based or have regular access to
emails. It is, therefore, important to provide information that is readily accessible to encourage
employees to commute to work by means other than the private car. To this end, the TPC will provide
noticeboards within staff areas, which display up to date travel information including key walking,
cycling, public transport and sustainable car use information.
Promotional Strategy 2: Offer Personal Journey Plans to Staff
5.1.2 The TPC will offer a ‘personal journey plan’ to all staff to inform them of the journey options available
for their commute to and from work. 
Walking and Cycling
5.1.3 In addition to the measures set out above, a number of initiatives could be implemented to encourage
walking and cycling, including: 
 Ensure cycle parking is regularly inspected and maintained;
 Consider the provision of a bike pump and bike repair kit for use by all staff;
 The changing rooms will be provided with coat hooks and a seat to enable staff to get changed; 
 Lockers will be provided in the staff room / changing rooms;
 Promote local / national walking and cycling initiatives via the aforementioned methods of
communication;
 Consider offering staff the cycle to work scheme, allowing them to buy a bike / bike related
equipment through a salary sacrifice arrangement via https://www.cycle2work.info/ or similar; 
 Develop walking and cycling user groups if demand arises; and
 Consider the provision of cycle training through local providers.
Public Transport
5.1.4 As set out in previous sections of this TP, travel to the site by bus is both practical and convenient,
with regular services operating within a short walk from the site. Travel by rail is less likely but will be
promoted as part of a multi-modal journey. The following measures could be implemented to
promote travel by public transport:
 Promote relevant public transport services, timetables, ticketing options and journey planning
software (including relevant travel apps);
 Provision of personalised journey planning; and
 Consideration of a salary sacrifice scheme for the purchase of bus / rail season tickets.
Lifts Home in Emergency Situations
5.1.5 Employees who walk, cycle or use public transport to travel to work will be provided with a free ride
home in the event of an emergency at the discretion of the Restaurant Manager.

Page 159

Proposed McDonald’s Drive-Thru Page | 10 Project No 55002
Perth Road, Blairgowrie June 2025 
Car Sharing
5.1.6 It is recognised that travelling by car is sometimes the only realistic option for certain journeys, or for
those who live in rural locations.
5.1.7 For staff, lift sharing represents a practical and convenient alternative form of travel. As previously
mentioned, there would be 75 staff employed at the restaurant. Staff work shifts and the number of
staff expected to be on shift at any one time would be 20 people. McDonald’s staff work varying shift
patterns depending on their needs and the requirements of the restaurant.
5.1.8 To encourage lift sharing amongst employees, the following measures could be employed at the site:
 Promote the Liftshare website via liftshare.com/uk, which provides details on car sharing in the
region; 
 Provide practical advice on lift sharing via the aforementioned methods of communication;
 Generate an internal database using staff post code data, which could be used to identify where
car sharing may be a feasible option; and
 Consider allocating the most convenient spaces in the car park for use by those lift sharing.
Free Meals
5.1.9 Staff are offered free meals, which reduces the need to undertake car trips during staff breaks to
obtain food. Staff also benefit from a crew room to relax in during breaks, which also reduces the
need to travel off site during rest periods.
Deliveries, Refuse Collection and Recycling
5.1.10 Goods are delivered by articulated lorry, typically 16.5m in length. Larger vehicles are used to enable
more stores to be serviced in a single trip, reducing the frequency of returns to the supply centre,
distance travelled and carbon emissions.
5.1.11 Multi-temperature vehicles are used, which allows all of the restaurants requirements of frozen,
chilled and ambient products to be delivered in one visit, reducing the overall number of deliveries
each restaurant receives and further reducing carbon emissions.
Waste minimisation and recycling are promoted.
5.1.12 Waste minimisation has been achieved through the redesign of bin tray liners and specifying the use
of light-weight bin liners. Food wastage is minimised using a computer system which monitors the
amount of food served at given times of day, resulting in more accurate preparation and ordering of
stock. This, therefore, reduces the quantum of waste and frequency of collection required.
5.1.13 Service vehicles also collect empty delivery trays and crates which are returned to suppliers for re-
use.
5.1.14 Cooking oil from restaurants is recycled into bio diesel and is collected by the delivery vehicle. The
bio diesel is used as fuel by all McDonald’s delivery vehicles and results in a carbon saving of 8,200
tonnes per annum.

Page 160

Proposed McDonald’s Drive-Thru Page | 11 Project No 55002
Perth Road, Blairgowrie June 2025 
5.2 ACTION PLAN
5.2.1 An Action Plan for the implementation of the measures outlined in the Travel Plan is summarised in
Table 5-1.
Table 5-1 Action Plan for Proposed Travel Plan Measures
Proposed Measures Responsible Party Timescale for Implementation
Appointment of Travel Plan
Co-ordinator McDonalds Restaurants Ltd Within 3 months of occupation
Cycle discount for staff
universal cycles McDonalds Restaurants Ltd On-going
Cycle parking provision McDonalds Restaurants Ltd From first occupation
Changing facilities for staff McDonalds Restaurants Ltd From first occupation
Staff travel information Assistant Restaurant Manager Within 3 months of occupation
Free meals for staff McDonalds Restaurants Ltd From first occupation
Free ride home in
emergencies Assistant Restaurant Manager From first occupation
Cooking oil to biofuel McDonalds Restaurants Ltd From first occupation
Monitoring programme Assistant Restaurant Manager
/ AMA From first occupation

Page 161

Proposed McDonald’s Drive-Thru Page | 12 Project No 55002
Perth Road, Blairgowrie June 2025 
6 ATTITUDES TO TRAVEL CHANGE
6.1.1 The travel survey’s that McDonald’s undertake at other sites around the country sought to
understand staff attitudes towards making a modal change to:
 Walking;
 Cycling;
 Car sharing with another employee; and
 Using public transport.
6.1.2 The results of the survey for restaurants in retail park environments are summarised in Table 6-1.
Table 6-1 Staff Attitudes Survey Results
Mode Positive Negative Reason for Negative %
Walk 45% 55%
Too Far 87%
Inconvenient 5%
Too dark or dangerous 4%
Need car for school run/childcare etc 3%
Prefer to drive 1%
Cycle 45% 55%
Too far or too tiring 47%
Don’t have a bike 40%
Dangerous or unsuitable roads 3%
Don’t like cycling in dark/bad weather 3%
Don’t like cycling 3%
Prefer to drive 2%
Need car for school run/childcare etc 2%
Car Share 74% 26%
Shift clashes / no-one to share with 39%
Too far 22%
Interferes with other commitments 16%
No car or license 11%
Prefer driving than being a passenger 6%
Lives too close to be worthwhile 6%
Public
Transport 62% 38%
Too expensive 26%
Dislike buses 20%
Unreliable or inconvenient services 20%
No services at all 17%
Not considered a viable travel option 11%
Health or disability 3%
Need car for school run/childcare etc 3%
6.1.3 The survey results show that the primary reason preventing active travel mode choices is distance,
although a lack of cycle ownership is clearly also a key barrier to cycling. Cost was a key barrier to
staff travelling by public transport, as well as the perceived inconvenience / unreliability of services. 
6.1.4 This may be due to retail park restaurants being located further away from residential centres,
meaning they will only be served by limited bus routes. If staff need to catch multiple buses, then the
perceived (and actual) inconvenience of changing service will considerably affect their willingness to
use this mode.

Page 162

Proposed McDonald’s Drive-Thru Page | 13 Project No 55002
Perth Road, Blairgowrie June 2025 
6.1.5 However, as has been demonstrated in Section 4, the proposed restaurant at Perth Road, Blairgowrie
is located close to bus stops with services of a reasonable frequency, therefore staff at this restaurant
may have more positive attitudes to public transport than typically occurs at retail park restaurants.

Page 163

Proposed McDonald’s Drive-Thru Page | 14 Project No 55002
Perth Road, Blairgowrie June 2025 
7 MONITORING AND REVIEW
7.1 MONITORING
7.1.1 Ongoing monitoring and reporting is necessary for ensuring the continued effectiveness of this Travel
Plan.
7.1.2 A sample copy of the staff travel questionnaire is included in Appendix B.
7.1.3 The TPC will provide survey forms, one for each employee, and will be responsible for printing and
distributing the surveys to staff as well as collecting the completed questionnaires. These would then
be supplied to AMA for review.
7.1.4 Surveys would be undertaken to inform the review in:
 Year 1 (baseline) – within 6 months of opening;
 Year 3; and
 Year 5 (final survey).
7.2 TARGETS
7.2.1 All targets must be SMART (Specific, Measurable, Achievable, Realistic and Timebound).
7.2.2 The targets will relate to staff only. In terms of customer trips, it is known that the majority of trips
to the store are likely to be made using a car. McDonald’s will promote the use of sustainable modes
but in reality, they will only be able to have a limited effect on how people travel. For this reason, it
is not proposed to set a target for the mode share of customer trips.
7.2.3 Interim targets for years 1, 3 and 5 are set out in Table 7-1. These targets will be subject to review
following the results of the baseline survey. 
Table 7-1 Interim Targets
Proposed Measures Year 1 (Baseline
Estimate) Year 3 Year 5
Car Driver (Alone) 33% 31% (-2%) 28% (-5%)
Alternative Modes 67% 69% (+2%) 72% (+5%)
7.2.4 The process of further periodic monitoring, target evaluation and review would be undertaken for
the period of five years from first occupation. Should the targets in year five be met then it is
considered that no further assessment will be required.
7.3 REVIEW DEFINITION
7.3.1 A Review shall be a report prepared by Andrew Moseley Associates Limited on behalf of the TPC.
The Review will examine the results of the travel surveys and comprehensively assess the
effectiveness of the Travel Plan in:
 Implementing the measures contained within Section 5 of this Travel Plan; and
 Achieving its aims, objectives and targets.

Page 164

Proposed McDonald’s Drive-Thru Page | 15 Project No 55002
Perth Road, Blairgowrie June 2025 
7.3.2 It should also (if necessary) propose further reasonable measures which would improve the
effectiveness of the Travel Plan.
7.3.3 The review should validate and suggest adjustments, if necessary, to the targets in the Travel Plan.
7.4 REVIEW TIMETABLE
7.4.1 The timetable for submission of Reviews is as follows:
 Year 1 review (within 6 months of opening);
 Year 3 review; and
 Year 5 final review. 
7.5 REVIEW PROCEDURE
7.5.1 The reviews shall be submitted in writing by the TPC / AMA to the Council.
7.5.2 The TPC / AMA shall consult the Council on the content of each Review. 
7.5.3 The Council shall respond to the submission within one month of receipt, either recommending
approval, or in the event that the submissions are unacceptable the Council will forward the reasons
for this, and AMA will address through a revised submission within one month of receipt.
7.5.4 The recommendations of the Review shall be implemented immediately or as soon as possible (as
appropriate dependent upon the type of measures) upon completion of an approved review.
7.5.5 Should any meetings between the parties be necessary, to discuss the contents of the submissions,
then this shall be arranged.

Page 165

Proposed McDonald’s Drive-Thru Page | 16 Project No 55002
Perth Road, Blairgowrie June 2025 
8 SUMMARY OF TRAVEL PLAN
8.1.1 The aim of the McDonald’s staff Travel Plan is to make staff aware of the alternative means of
transport that are available in order to travel to and from their place of work and in particular, reduce
the number of journeys to work that are made by car.
8.1.2 Travel surveys will be undertaken in years 1, 3 and 5 and the results used to inform the Review
process.
8.1.3 New staff will be appraised of the Travel Plan as part of their staff induction so that good practice in
terms of modal choice is encouraged from the outset.

Page 166

FIGURES
Figure 1 – Site Location Plan
Figure 2 – 2km Walking Isochrone
Figure 3 – Public Rights of Way Map
Figure 4 – 5km Cycling Isochrone
Figure 5 – Bus Stop Location Plan

Page 167

APPENDICES
Appendix A – Proposed Site Layout
Appendix B – Sample Staff Travel Questionnaire

Page 168

Appendix A 
PROPOSED SITE LAYOUT

Page 169

Starbucks
Bespoke
McDonald's
Restaurant
NG50
Entrance
CBCB
LPLP
Bespoke
Corral
BOL
BOL
LPLP
LPLP
DKDK
LPLP
2 no. Grill Bays
38no. Car Parking Spaces
(Inc. 3no. Accessible Bays)
Patio
Deliveries
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
LPLP
3
2
9
7
5
4
1212
1010
2 no. Grill Bays
38no. Car Parking Spaces
(Inc. 3no. Accessible Bays)
Patio
Deliveries
- 13/03/2025 AGAG BSC
Initial Issue
project
client
drawing title
date
scale@A1
drawn
checked
drawing stage
aew
architects
0161 214 4370
www.aewarchitects.com
Job No
Rev
Purpose of Issue
Drawn by: -Date Checked by: -REV
store
NOTES
· All dimensions and levels are to be checked on site.
· Any discrepancies are to be reported to the architect
before any work commences.
· Whilst information on this sheet is issued to scale,
scaling directly from this drawing may result in
inaccuracies. For precise measurements, refer to the
stated dimensions or contact the Architect.
· This drawing shall not be reproduced without express
written permission from AEW.
· Title overlay drawings and ownership boundaries are
produced using all reasonable endeavours. AEW cannot
be responsible for the accuracy or scale discrepancy of
base plans supplied to them.
· All works are to be undertaken in accordance with
Building Regulations and the latest British Standards.
· All proprietary materials and products are to be used
strictly in accordance with the manufacturers
recommendations.
For Information
Planning
McDonald's Restaurants Ltd
2473Blairgowrie
Perth Road
Proposed Site Plan
13/03/2025
1:200
AGAG
BSC
13638_AEW_2473_1004
D
0 2 4 6 8 10m
Scale 1:200
N
Planning
Proposed Site Plan
Project Notes
· All drawings to be read in conjunction with all other
drawings as noted on issue sheet.
Drawing based:
· Glanvilles Topographical Survey drawing 4240368/4101
Dated:01/07/24
· Ordnance Survey (c) Crown Copyright 2023. All rights
reserved. Licence number 100022432
· Westpark, Blaigowrie Draft Site 7 Disposition drawing
DISPOSITION - PLAN 1(30560098.2) (1) Dated:
12/08/24
· LAUK Lighting Layout drawing no.
6279828_CALC_McDonalds Blairgowrie (R1), Dated:
18/06/25
· Existing below ground utilities/services unknown,
Intrusive surveys required
McDonald's Demise Boundary Indicated:
McDonald's Application Boundary Indicated:
Extent of No Build Zone:
Extent of Landscaping Buffer Zone:
General Site Proposal Notes:
'DOT' denotes Department of Transport Signs installed in
accordance will all Approved Documents and British Standards.
'DK' denotes location of drop kerbs to be installed.
Drop kerbs to be installed:
· Along delivery routes
· Around Accessible Parking Bays in accordance with AD M
· At Pedestrian crossing point
Yellow Thermoplastic Material to:
· All Drive Thru related road markings
· Accessible parking bays in accordance with AD M
· Parked order bays
White Thermoplastic Material to:
· Car park related road markings to be in white thermoplastic
material
· Standard parking bays to be finished in white thermoplastic
material
· All junction road markings
· All pedestrian crossings
Site Plan
Scale 1:200
Parking Schedule
Bay Type Proposed
Accessible Bays 3
Grill Bays 2
General Bays 3333
EVC Bays 0
Total Car Bays 3838
Cycle Spaces 6
Motorcycle Spaces 3
Schedule of Areas
Proposed
Site Area (Hectares) 0.2885
Building GEA (m²) (exc. Corral) 314.4
Building GEA (m²) (inc. Corral) 373.5
Building GIA (m²) 291.7
Proposed 600mm high Timber Knee
Rail Fence
Proposed 1100mm high Close Boarded
Timber Fence
Target Bin
Cranked bollards
Painted Black
Tactile Blister Paving
"LP" Denotes Lamppost
Site Features Key
CBCB
LPLP
150mm Diameter stainless steel
protective bollard
BOL
A 20/03/2025 WJB BSC
Building moved slightly north and squared off to the south. Patio,
Drive Thru and Parking reworked to accommodate change.
B 09/05/2025 WJB BSC
Building footprint moved south, corral enlarged and patio, drive
thru and site reworked to accommodate change.
C 06/06/2025 WJB BSC
Building footprint updated, cash booth relocated. Site, drive thru,
patio and corral layout updated to suit new building footprint
Proposed 1500mm high Close Boarded
Timber Fence (Subject to Acoustic
Specialist Design)
D 10/06/2025 WJB BSC
Acoustic fence line added. LAUK Lighting layout added.

Page 170

Appendix B 
SAMPLE STAFF TRAVEL QUESTIONNAIRE

Page 171

STAFF
TRAVEL
QUESTIONNAIRE
RESTAURANT NO: CONFIDENTIAL
The following information is required to produce a Travel Plan for McDonald’s Restaurants.
Please complete all the sections as accurately as possible – there is no right or wrong answer.
Surname Initials
Job Title Home postcode
e.g. NW10 1NE
Gender Male Female
Age Under 25 25-34 35-44 45-54  Over 55
Do you work full/part
time? (please tick)
What are your normal working hours? e.g. 8am – 5pm
Mon Tues Wed Thurs Fri Sat Sun
Part
time
Full
time
Which mode of transport do you use most often when travelling to or from work?
(please tick one option only)
1. Car 6. Train/Tram
2. Car passenger
(shared with another McDonald’s employee)
7.  Bus
(Numbers if available ……………………..)
3. Car passenger
(dropped off by friend/relative)
8. Cycle
4. Motorcycle
(parked in McDonald’s car park)
9. Walk
5. Taxi Other (please state)
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
…
..
Do you use a car as part of your
job? Yes No Not applicable
How long does your journey take
(please tick box) 0-5 mins 5-10 mins 10-20 mins >20 mins
How far do you travel?
(please tick box) 0-1 miles 1-3 miles 3-5 miles >5 miles
Would you be prepared to: Yes No If No, Please State Reason
Walk 
Cycle  
Car Share with another employee 
(as either driver or passenger)  
Use Public Transport  
Survey completed – Thank-you!

Page 172

All rights are reserved. Copyright © 2022
Andrew Moseley Associates, 51A St Paul’s Street, Leeds, LS1 2TE 
www.amatp.co.uk
info@amatp.co.uk

Page 173

Ecological Appraisal
Proposed Construction of a New Drive-Thru Restaurant 
Perth Road, Blairgowrie
30th October 2024
Revision C – 13th June 2025
Report Reference Number: A6760

Page 174

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 2 - 
Document Control
Date of first Issue Revision Date of Revision Issued By Checked by
30th October 2024 - - LR MJB 
A 19th November 2024 AW MJB 
B 14th February 2025 AW MJB 
C 13th June 2025 AW MJB

Page 175

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 3 - 
Executive Summary 
This ecological appraisal report details the potential ecological effects of the proposed
construction of a new drive-through restaurant at Perth Road, Blairgowrie. 
The site currently comprises an area of previously disturbed grassland habitats, located within a
wider development site. Habitats on the site are considered to be of ecological value within the
zone of influence only and are unlikely to be used by protected species. 
The loss of habitats on the site would not have a significant ecological impact. A wildlife-friendly
lighting scheme is recommended. 
The development presents opportunities for ecological enhancements and native shrub, tree and
hedgerow planting, nectar-rich planting and wildflower grassland is recommended to benefit birds
and urban pollinators. 
Provided all of the recommended mitigation measures and some of the recommended ecological
enhancement measures are implemented, the development would comply with relevant nature
conservation legislation and planning policy regarding the protection of biodiversity and the
provision of ecological enhancements.

Page 176

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 4 - 
1.0 Introduction 
1.1 Background
This document details the ecological effects of the proposed construction of a proposed
new drive-through restaurant on land at Perth Road, Blairgowrie (see Figure 1.1 for the
site location). In August 2024, Encon Associates were instructed by McDonald’s to
undertake an ecological survey of the site in order to provide information regarding the
ecology of the site and inform plans for its development. The proposed site lies within a
larger site which has an existing planning permission for a neighbourhood centre
incorporating a number of retail units (planning ref: 19/00163/AMM). 
1.2 Brief Description of the Proposed Works
The proposals entail clearance of the site, followed by the construction of a new
McDonald’s drive-through restaurant, with associated car parking, access and landscaping. 
1.3 Scope 
This document aims to assess the likely ecological effects of the proposed development.
The scope of this Ecological Assessment is to:
• Identify any potential biophysical changes as a result of the proposed development.
• Identify and provide a valuation of features of ecological interest on a site (such as
habitats and protected species) and recommend further surveys should they be
necessary.  
• Assess the likely ecological effects of the development against relevant legislation
and policy.
• Recommend avoidance and/or mitigation measures that are likely to be required to
reduce the ecological impact of the proposals.

Page 177

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 5 - 
If no further surveys are recommended, this report can serve as full assessment of the
ecological effects of the development in support of any planning application. 
1.4 Legislation and Policy Context
1.4.1 Relevant Legislation
The Wildlife & Countryside Act 1981 (as amended) (1) is the primary piece of legislation by
which biodiversity in the UK is protected. The most relevant areas of the Act to
development related activities are:
• The identification and subsequent protection of Sites of Special Scientific Interest
(SSSIs), which prohibits damaging activities
• The protection of certain species listed in Schedule 5, which prohibits killing,
injury, disturbance, damage and/or destruction of breeding sites and/or resting
places and sale (it should be noted that all parts of this protection do not apply to
all Scheduled species)
• The protection of wild birds and their nests, which prohibits damage or destruction
of nests whilst in use. Species listed in Schedule 1 of the act receive additional
protection from disturbance whilst they are building a nest or are near a nest
containing eggs or young. It also prohibits the disturbance of dependent young.
• Measures to prevent the spread of invasive plant species. 
The Conservation (Natural Habitats &c) Regulations 1994 as amended (known as the
‘Habitats Regulations’) (2), pass two EEC Directives into UK law. The Regulations protect
sites and species deemed to be of conservation importance across Europe. The most
relevant parts of the Regulations to development related activities are:
• The protection of Special Protection Areas (SPAs) and Special Areas of Conservation
(SACs)

Page 178

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 6 - 
• The protection of species listed within Schedule 2 of the Regulations, which
prohibits killing, injury, disturbance, damage and/or destruction of breeding sites
and/or resting places and sale, this confers some level of habitat protection. 
In order for activities that would be likely to result in a breach of species protection under
the regulations to legally take place, a European Protected Species (EPS) licence must first
be obtained from NatureScot. 
The Protection of Badgers Act 1992 (3), deals solely with the protection of badgers Meles
meles in the UK. It prohibits killing, injuring or taking badgers, damaging, destroying or
otherwise interfering with a badger sett, disturbing an occupied badger sett and sale of
badgers. 
Within Scotland, the Wildlife and Natural Environment (Scotland) Act 2011 (4) amends
several pieces of wildlife legislation, including the Wildlife & Countryside Act. However,
most of the amendments are of limited relevance to development activities. 
The Nature Conservation (Scotland) Act 2004 (5) requires that public bodies to have regard
to the conservation of biodiversity. This means that Planning Authorities must consider
biodiversity when reaching planning decisions. This legislation includes the Scottish
Biodiversity List (SBL), which identifies habitats and species considered to be principal
importance in Scotland.

Page 179

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 7 - 
1.4.2 Planning Policy
Scottish Government policy with respect to the protection of biodiversity is laid out in the
National Planning Framework 4 (NPF4) (6). This includes the following policies relevant to
the protection of and enhancement of ecology in relation to development:
• Policy 1 Tackling the climate and nature crises requires LDPs to consider the
impact of their development plans on climate and biodiversity.
• Policy 3 Biodiversity requires development proposals to contribute to the
enhancement, restoration and conservation of biodiversity and to minimise any
potential adverse impacts. 
• Policy 4 Natural places protects a variety of identified places and sites, including
those designated for biodiversity.
• Policy 6 Forestry, woodland and trees gives support to development proposals that
enhance, expand and improve woodland and tree cover will be supported. 
Local planning policy is contained within the Perth & Kinross Local Development Plan 2
(7), which contains policies directly relevant to the protection of the natural environment.
Directly relevant policies to ecology and biodiversity include:
• Policy 38: Environment and Conservation protects international, national and local
designated sites.
• Policy 40: Forestry, Woodland and Trees protects trees across Perth & Kinross,
including on development sites.
• Policy 41: Biodiversity habitats and species of ecological value including EPS and
other protected species, as well as priority habitats and species within the Tayside
Biodiversity Action Plan.
• Policy 42: Green Infrastructure requires development to contribute to green
infrastructure.

Page 180

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 8 - 
The full text of relevant policies is provided in Appendix I. 
1.4.3 Other nature conservation policy
Biodiversity Action Plans (BAPs) are the UK’s response to the 1992 Convention on Biological
Diversity. The UKBAP described the biodiversity of the UK and contains Action Plans for the
most threatened habitats and species. It is implemented at a local level through regional
and local BAPs. The UK Post 2010 Biodiversity Framework has now superseded the UKBAP
(implemented in Scotland via the Scottish Biodiversity Strategy (8), and through Local
Biodiversity Partnerships a more local level). Perth & Kinross is covered by the Tayside
Local Biodiversity Action Plan 2nd Edition 2016-2026 (TBAP, 9).

Page 181

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 9 - 
Figure 1.1: Site location. Contains Ordnance Survey data © Crown copyright and database right 2024.

Page 182

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 10 - 
2.0 Methodology 
2.1 Desk Study Methodology
Available online resources such as the MAGIC (Multi-Agency Geographical Information for
the Countryside), Sitelink (NatureScot’s mapping system) NBN Scotland (National
Biodiversity Network) websites and Perth & Kinross Council’s Local Development Plan map
were interrogated for relevant information, including statutory designated sites within
5km of the site. In addition, an Ecological Appraisal covering the existing planning
permission was consulted for relevant regarding to the site prior to the adjacent
development (10). 
2.2 Field Survey Methodology 
2.2.1 Ecological Appraisal
The Ecological Appraisal survey was carried out by Dr Liam Russell CEcol MCIEEM for and
on behalf of Encon Associates Ltd on 29 October 2024. The survey followed the Chartered
Institute of Ecology and Environmental Management (CIEEM) Preliminary Ecological
Appraisal guidance (11). The survey consisted of a site walkover (loosely based on the
“Phase 1” methodology (12), modified to suit the situation) with all accessible areas of the
site and adjacent land (where relevant) covered. Habitats are classified and described in
accordance with UKHabs descriptions (13), with attention paid to their potential to
support protected species. A general search for evidence of protected species was also
undertaken.

Page 183

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 11 - 
2.3 Assessment Methodology
2.3.1 Introduction 
The methodology for the assessment of the likely ecological effects of the proposed
development is based on the principles of CIEEM’s Guidelines for Ecological Assessment in
the UK, 2nd Edition (14). Although this assessment does not constitute a formal Ecological/
Environmental Impact Assessment, the CIEEM guidelines provide a useful framework for
assessing ecological impacts at any level. 
2.3.2 Valuation
Features of ecological interest are valued on a geographic scale. Value is assigned on the
basis of legal protection, national and local biodiversity policy and cultural and/or social
significance. 
2.3.3 Identification of Potential Ecological Impacts in Absence of Mitigation
A development may have ecological effects beyond its site boundaries, therefore the
CIEEM guidelines require that the ‘zone of influence’ be identified. Due to the relatively
small size of this development, for the majority of ecological features, the zone of
influence is considered unlikely to extend beyond the footprint of the works and
immediately adjacent habitat. 
Without mitigation, the proposed development may result in the following biophysical
changes during construction and/or operation:
• Loss of and damage to habitats within or adjacent to the footprint of the
development and construction zone.
• Any loss or damage of habitats could result in death and/or injury to protected
species should they be present.

Page 184

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 12 - 
• Disturbance of immediately adjacent habitats and any wildlife using them during
construction. 
2.4 Limitations
This survey comprised a single walkover. As such it is only possible to gain a snapshot of
the ecology of the site and it is possible that some seasonal species could be missed,
particularly given the timing of the survey. However, given the habitat types present on
the site it is considered highly unlikely that any species or features of ecological
significance would be missed. 
The ecology of a site can change quickly over time. Therefore, this survey is considered
valid for two years from the date of the report.

Page 185

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 13 - 
3.0 Ecological Baseline 
3.1 Site Context
The proposed development site is located in the southwest of Blairgowrie approximately
1.4km from the town centre (see figure 1.1 for the site location). It lies within an urban
fringe area with a mixture of developed and undeveloped land including agricultural land,
small woodlands, recreational open space, housing and retail development. 
The site is part of a former agricultural field within the wider Westpark development site.
It is bounded by the A93 Perth Road to the east, beyond which lies a cemetery and areas
or residential development. The area to the south is recently developed with retail and
food units. Surface water balancing ponds were created as part of the new development
and lie immediately to the west of the site. The remainder of the original agricultural field
is present to the north and comprises currently unmanaged grassland. An area of
broadleaved ancient woodland is present approximately 70m to the west. 
3.2 Protected Sites
3.2.1 Statutory sites 
There are two internationally designated sites within the vicinity of the site:
• The River Tay SAC lies approximately 1.25km northeast of the site at its closest
point as it passes through Blairgowrie and Rattray. It is designated for its
population of Atlantic salmon Salmo salar, with populations of sea lamprey
Petromyzon marinus, brook lamprey Lampetra planeri, river lamprey Lampetra
fluviatilis and otter Lutra lutra present, as well as standing water habitats with
aquatic vegetation.

Page 186

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 14 - 
• Dunkeld – Blairgowrie Lochs SAC lies approximately 2.5km west of the site and is
designated for its oligotrophic to mesotrophic standing water habitat and
population of slender naiad Najas flexilis, an aquatic plant. It also supports
important bog habitats and a population of otters. The part of the SAC nearest the
site is also designated as Lochs Clunie and Marlee SSSI. 
In addition to the SSSIs also designated as SAC, one further SSSI is present with 2km of the
site:
• Ardblair and Myreside Fens SSSI lies approximately 700m to the northwest of the
site and is designated for its fen habitats.  
3.2.2 Non-statutory sites 
No non-statutory sites were identified within the vicinity of the site. 
3.2.3 Protected sites within the Zone of Influence 
It is possible for ecologically sensitive sites to be affected by development within their
vicinity. However, the sites identified here are considered to be outside of the zone of
influence of the proposed development. They do not fall within the development site or
directly adjacent to it and therefore no direct impacts in terms of habitat loss, damage or
disturbance will occur. 
3.3 Description of Habitats Within the Zone of Influence
3.3.1 Habitats
A map of the habitats on the site with target notes is provided in figure 3.1.

Page 187

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 15 - 
The site comprises a small section of a former agricultural field. The previous Ecological
Assessment covering the site (11) identified this an abandoned pasture containing species-
poor grassland, and noted that it had been in continual agricultural use since at least the
mid-1800s. Since this survey was undertaken in 2019, the site was almost entirely cleared
and used a storage/parking area during the development of the site to the south and
online ariel imagery dated July 2021 shows the site as largely bare ground. The habitats
present on the site have mostly developed since this time. 
Most of the site comprises unmanaged grassland dominated by agricultural and coarse
grass species (target note 1, photos 1 and 2), such as Yorkshire fog Holcus lanatus, cock’s-
foot Dactylis glomerata, common bent Agrostis capillaris and timothy Phleum pratense. A
few herb and ruderal species are present in the sward including broad-leaved dock Rumex
obtusifolius, hogweed Heracleum sphondylium, cow parsley Anthriscus sylvestris, smooth
sow-thistle Sonchus oleraceus, creeping thistle Cirsium arvense, ox-eye daisy
Leucanthemum vulgare and creeping buttercup Ranunculus repens. Well-trodden paths
cross the site (target note 2), and the disturbance has allowed species such as white clover
Trifolium repens, ribwort plantain Plantago lanceolata and dandelion Taraxacum
officianale agg. to become established. Due to its low number of species, its agricultural
history and recent disturbance, this is classified as g4 Modified grassland. 
A section of the site was surfaced with crushed aggregate when the site was used as a
storage area (target note 3). Part of the area is still used for informal parking and is
largely devoid of vegetation (photo 3), however, in other areas is being recolonised by
vegetation (photo 4) including grasses such as creeping bent Agrostis stolonifera and
common couch Elymus repens, and flowering species such as white clover, creeping
buttercup, ribwort plantain, greater plantain Plantago major, spear thistle Cirsium

Page 188

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 16 - 
vulgare and hairy bittercress Cardamine hirsuta. This habitat is classified as u1 Built-up
areas and gardens (82 Vacant or derelict land). 
Small areas of new tarmac and block paving have been created on the southern edge of
the site (target note 4). This is classified as u1b Developed land; sealed surface. 
Two balancing ponds are present to the west of the site (photos 5 and 6). These were
created in 2021 to manage surface water from the large, paved areas of the new
development to the south. Since their creation they have become vegetated and area
largely covered with reedmace Typha latifolia, although the southern pond had an area of
flote-grass Glyceria fluitans in the centre. Very little open water was visible at the time of
the survey and the level of water on the southern pond appeared very low despite recent
high rainfall. 
The woodland to the west of the site is considered to be outside of the zone of influence
of the development and therefore was not included in the survey. However, the previous
Ecological Assessment (11) identified it as broad-leaved ancient woodland of moderate
local value. Some mapping sources show a small pond present within woodland,
approximately 90m northwest of the site, and the previous Ecological Assessment
identified this as a curling pond. This has now largely been lost to succession, overtaken
by willow Salix spp. and sedges Carex spp., with open water no longer present. 
3.4 Protected or Notable Species
3.4.1 Introduction 
A large number of protected and/or notable species have been recorded from within the
vicinity of the site (information primarily sourced from NBN Scotland). A high proportion of

Page 189

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 17 - 
these were for species which would not be found in the habitats present within the zone
of influence. For example, many were for otter and beaver Castor fiber from the River
Tay and other aquatic habitats within the vicinity, and several were of red squirrel Sciurus
vulgaris from the nearby woodland and other wooded areas. Due to the habitats present
on the site, it is of generally low suitability for protected species, however, species which
could occur within the zone of influence are considered in greater detail below. 
3.4.2 Amphibians
NBN held over 12 records of amphibians within 2km of the site including common frog Rana
temporaria, common toad Bufo bufo, palmate newt Lissotriton helveticus and great
crested newt Triturus cristatus. The two records for great crested newts were both over
1km from the site and the most recent dated from 1960. 
The small curling pond in the wood is suitable breeding habitat for common frog and
palmate newt, but due to habitat succession is unlikely to be suitable for common toad or
great crested newt. The new balancing ponds may be suitable for a variety of species,
although it is possible they may not hold water for a sufficient period to allow successful
breeding. Parts of the site could be used by amphibians during the terrestrial phase of
their lifecycle, but this is restricted to the small area of undisturbed grassland on the
northern edge of the site, and this is of relatively low suitability. 
The previous Ecological Assessment (11) concluded that great crested newts were not
present across the whole Westpark site was and no mitigation was implemented during the
recent construction, including previous clearance of this site. Although the balancing
ponds may be suitable, the lack of great crested newts in the wider landscape means that

Page 190

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 18 - 
their colonisation is unlikely. Therefore, the likelihood of great crested newts being
present on the site remains low. 
3.4.3 Bats
There are no structures or trees on the site that could be used by roosting bats. The
previous ecological report (11) suggested the woodland edges of the wider Westpark site
could be used for foraging, however this is some distance from the site. The site itself is
relatively exposed and brightly lit due to the adjacent development and busy road. There
were very few existing records of bats close to the site, limited to soprano pipistrelle
Pipistrellus pygmaeus and brown long-eared bat Plecotus auritus. 
3.4.4 Other terrestrial mammals
Hedgehogs Erinaceous europaeus have been recorded several times within the vicinity of
the site and the habitats there are suitable for their use. Only one record of a badger
Meles meles were found within 2km of the site. No evidence of badgers using the site was
noted during the survey, or the previous ecological survey (11). 
3.5 Ecological Valuation
Habitats on the site are of limited ecological value. They are heavily modified, do not
support any particularly notable plant species and are commonplace within the local area.
It is unlikely to support protected or notable species. Therefore, the site is considered to
be of ecological value within the zone of influence only.

Page 191

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 19 - 
Figure 3.1: Habitats present on the site. See main text for target note descriptions.

Page 192

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 20 - 
Photo 1: Most of the site comprises recently re-
established grassland. 
Photo 2: A small area of the grassland on the northern
edge of the site retains the original agricultural
vegetation. 
Photo 3: Part of the site was surfaced with aggregate.
The eastern site of this area is used for informal parking
and is largely devoid of vegetation. 
Photo 4: Where it is less disturbed, the aggregate-
surfaced area is beginning to revegetate. 
Photo 5: Two balancing ponds are present to the west of
the site.
Photo 6: Water levels in the ponds were low despite
recent heavy rainfall.

Page 193

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 21 - 
4.0 Assessment of Likely Impacts in Absence of Mitigation 
4.1 Introduction
The CIEEM guidelines (13) require that the potential impacts of the proposals should be
considered in absence of mitigation. In order for a significant adverse effect to occur, the
feature being affected must be at least of local value. However, in some cases, features of
less than local value may be protected by legislation and/or policy and these are also
considered within the assessment. Although significant effects may be identified at this
stage of the assessment, it is often possible to provide appropriate mitigation. 
4.2 Site Preparation and Construction Activities
4.2.1 Habitats
The proposals will result in the loss of areas of low value grassland and other disturbed
habitats. These are not considered to be of significant ecological value and therefore
there would be no significant impact as a result of this loss. 
4.3 Site Operation
The proposals would result in an increase in external lighting and human activity around
the site at night. This is likely to disrupt the behaviour of nocturnal wildlife such as
hedgehogs. 
Although great crested newts are unlikely to occur on the site, other amphibians, notably
palmate newt, common frog and common toad, have been recorded within the vicinity.
The new balancing ponds to the west of the development are suitable for these species,
and if they have not already been colonised there is a high likelihood of them being
colonised in the future. Kerbs and gully pots on the new development have the potential

Page 194

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 22 - 
to trap amphibians should they use the site, with amphibians being funnelled into drains
when following kerbs. Given the availability of higher quality woodland terrestrial habitat
immediately adjacent to the ponds and the historical unsuitability of the site for
amphibians, this impact is unlikely to be ecologically significant. However, there is a
potential animal welfare issue due to the risk of trapping amphibians in drains.

Page 195

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 23 - 
5.0 Mitigation, Compensation and Enhancements 
5.1 Introduction
This chapter contains recommendations for further works needed to fully assess the
ecological impacts of the proposals and to mitigate any potential adverse effects. In
addition, recommendations for the enhancement of nature conservation and biodiversity
on the site are included. 
5.2 Further Survey
No further surveys are recommended. 
5.3 Mitigation Measures
5.3.1 Sensitive lighting
New lighting associated with the proposals must be designed to minimse the effects on
nocturnal wildlife, particularly bats, and should follow best practice guidance (15). The
following principles will minimise the impact of lighting on nocturnal wildlife and should
be applied to the lighting design across the site:
• Use of low-level bollard lighting to minimise light spill.
• Directing lights away from the edges of the site and the use of hoods or similar
measures to direct light away from important habitats.
• Restriction of UV light frequencies through selection of suitable lighting elements
or the use of filters.
• Use of warm white spectrum lighting elements.

Page 196

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 24 - 
5.3.2 Amphibian protection
In order to prevent trapping amphibians in drains on the site, 45° angled kerbs should be
used throughout the development. Where this is not possible, recessed wildlife kerbs
should be installed adjacent to all gully pots/drains. In addition, gully pot ladders (16)
should be installed in all gully pots on the site1. 
5.4 Recommendations for Ecological Enhancements
5.4.1 Introduction
Due to the nature of the site and the type of development proposed, opportunities for
ecological enhancements are limited. However, the following measures would provide
some ecological benefit. 
5.4.2 Planting to benefit pollinators
There is potential to provide ecological enhancements by planting beneficial plant species
within landscaped areas of the development itself. Nectar-rich shrub species should be
planted which will provide a food source for a variety of pollinator species including bees.
Native species are preferred as they will benefit the widest range of species. Species such
as heathers Calluna and Erica spp. would be particularly beneficial. However, due to the
semi-urban nature of the site, other beneficial species, that provide a nectar source but
are not likely to spread into neighbouring areas, such as lavenders Lavendula spp., would
also be appropriate. 
5.4.3 Native trees and hedgerow
Native specimen trees and a native species hedgerow should be planted within the new
development. These should reflect species found within the nearby woodland where 
1 https://www.thebhs.org/the-bhs-amphibian-gully-pot-ladder

Page 197

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 25 - 
possible. Additional species which bear fruit or seeds would enhance the value of the site
for a variety of bird species, particularly those found in suburban habitats including song
thrush Turdus philomelos, dunnock Prunella modularis and house sparrow Passer
domesticus which are all DBAP Priority Species and have been recorded within the vicinity
of the site. Native tree species would provide the most benefit. Suitable species include
willows Salix spp., hazel Corylus avellana, rowan Sorbus aucuparia, wild service tree
Sorbus torminalis, wayfaring tree Viburnum lantana, holly Ilex aquifolium, silver birch
Betula pendula and downy birch Betula pubescens, dogwood Cornus sanguinea and spindle
Euonymus europeaus. Native hedgerows should also be planted at the edges of the site to
provide an additional resource for wildlife. 
5.4.3 Grassland seeding to benefit wildlife
The development includes grass verges within the landscaped areas. These will be sown
with a grass mix containing wildflowers that are tolerant of mowing, and these areas will
be managed with a reduce mowing frequency. Given the level of disturbance likely and
the need to maintain them to a degree, it is unrealistic to create g3c Other neutral
grassland (or similar). However, g4 Modified grassland in moderate condition is achievable
and this would provide a benefit for urban pollinators. Scotia Seeds Flowering Lawn Mix2 is
a suitable locally sourced seed mix. 
2 https://www.scotiaseeds.co.uk/shop/flowering-lawn-mix/

Page 198

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 26 - 
6.0 Summary and Conclusions 
6.1 Summary
The site currently contains grassland habitats of low ecological value. Due to the low value
of these habitats, site clearance would not have a significant ecological impact. Protected
or notable species are unlikely to be present on the site. 
In order to mitigate the ecological effects of the proposals, a wildlife-friendly lighting
design is recommended. 
There are opportunities to enhance the ecological value of the site post-development,
through planting trees shrubs, hedgerows and wildflower grassland which will benefit
pollinators, birds and other urban wildlife. 
6.2 Residual Impacts
In the absence of mitigation, the proposed development is unlikely to result in an adverse
ecological impact. Therefore, the proposals would comply with relevant legislation and
planning policies that protect biodiversity. 
Provided the recommended ecological enhancement measures are implemented, the
development would comply with relevant planning policy regarding ecological
enhancements. Consequently, there would be no residual impacts.

Page 199

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 27 - 
7.0 References 
1. HMSO. (1981). The Wildlife & Countryside Act 1981. HMSO, London.
2. HMSO. (2017). The Conservation (Natural Habitats &c) Regulations 1994. HMSO. Statutory Instrument 1994 No.
2716. HMSO, London.
3. HMSO. (1992). The Protection of Badgers Act 1992. HMSO, London.
4. HMSO. (2011). Wildlife and Natural Environment (Scotland) Act 2011. HMSO, London.
5. HMSO. (2004). The Nature Conservation (Scotland) Act 2004. HMSO, London.
6. Scottish Government. (2023). National Planning Framework 4. OGL, Edinburgh.
7. Perth & Kinross Council (2019). Perth & Kinross Local Development Plan 2 – Adopted 29 November 2019. Perth
& Kinross Council, Perth.
8. Scottish Executive (2004). Scotland’s Biodiversity, It’s in Your Hands. Scottish Executive, Edinburgh.
9. Anon. (2016). Tayside Local Biodiversity Action Plan – 2nd Edition 2016-2026. Tayside Biodiversity Partnership.
10. Rudd, N. (2019). Westpark Blairgowrie – Ecological Assessment. Report produced by Nigel Rudd Ecology for
Westpark Partnership.
11. CIEEM (2013). Guidelines for Preliminary Ecological Appraisal. Chartered Institute of Ecology and
Environmental Management, Winchester.
12. JNCC (1990). Handbook for Phase 1 Habitat Survey. Joint Nature Conservation Committee, Peterborough.
13. UKHab (2023). UK Habitat Classification – V2.0. (at http://ukhab.org.) 
14. CIEEM. (2016). Guidelines for Ecological Assessment in the UK and Ireland – Terrestrial, Freshwater and
Coastal, 2nd Edition January 2016. Chartered Institute of Ecology and Environmental Management, Winchester.
15. McInroy, C. & Rose, T.A. (2015). Trialling amphibian ladders within roadside gullypots in Angus, Scotland: 2014
impact study. The Herpetological Bulletin. 132: 15-19.
16. Bat Conservation Trust & Institute of Lighting Professionals (2019). Guidance Note 08/18 Bats and artificial
lighting in the UK – Bats and the Built Environment series. Institute of Lighting Professionals, Rugby.

Page 200

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 28 - 
Appendix 1 
Relevant planning policy from the Perth & Kinross Local Development Plan 2. 
Policy 38: Environment and Conservation 
Policy 38A: International Nature Conservation 
Sites Development which could have a significant effect on a site designated or proposed under the Habitats or Birds
Directive (Special Areas of Conservation and Special Protection Areas) or Ramsar site, will only be permitted where:
a) an appropriate assessment has demonstrated that it will not adversely affect the integrity of the site; or
b) there are no alternative solutions; and
c) there are imperative reasons of overriding public interest, including those of social or economic nature; and
d) compensatory measures are provided to ensure that the overall coherence of the Natura network is protected. 
Policy 38B: National Designations 
Development which would affect a National Park, National Scenic Area, Site of Special Scientific Interest or National
Nature Reserve, will only be permitted where the Council as Planning Authority is satisfied that:
a) the proposed development will not adversely affect the integrity of the area or the qualities for which it has
been designated; or
b) any such adverse effects are clearly outweighed by social, environmental or economic benefits of national
importance. 
Policy 38C: Local Designations 
Development which would affect an area designated by the Council as being of local conservation or geological interest
will not normally be permitted, except where the Council as Planning Authority is satisfied that:
a) the objectives of designation and the overall integrity of the designated area would not be compromised; or
b) any locally significant adverse effects on the qualities for which the area has been designated are clearly
outweighed by social and economic benefits. 
Policy 40: Forestry, Woodland and Trees 
Policy 40A: Forest and Woodland Strategy 
The Council will support proposals which:
a) deliver woodlands that meet local priorities as well as maximising benefits for the local economy,
communities, sport and recreation and environment;
b) protect existing trees/woodland including orchards, especially those with high natural, historic and cultural
heritage value;

Page 201

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 29 - 
c) seek to expand woodland cover in line with the guidance contained in the Perth and Kinross Forest and
Woodland Strategy Supplementary Guidance;
d) encourage the protection and good management of amenity trees, or groups of trees, important for visual
amenity, sport and recreation or because of their cultural or heritage interest;
e) ensure the protection and good management of amenity trees, safeguard trees in Conservation Areas and trees
on development sites in accordance with BS5837 ‘Trees in Relation to Construction’;
f) seek to secure establishment of new woodland in advance of major developments where practicable and
secure new tree planting in line with the guidance contained in the Perth and Kinross Forest and Woodland
Strategy. The planting of native trees and woodland will be sought where it is appropriate. 
40B: Trees, Woodland and Development 
Tree surveys, undertaken by a suitably qualified professional, should accompany all applications for planning permission
where there are existing trees on a site. The scope and nature of such surveys will reflect the known or potential
amenity, nature conservation and/or recreational value of the trees in question and should be agreed in advance with
the Council. 
The Council will follow the principles of the Scottish Government Policy on Control of Woodland Removal and
developers are expected to fully accord with its requirements. In accordance with that document, there will be a
presumption in favour of protecting woodland resources except where the works proposed involve the temporary
removal of tree cover in a plantation, which is associated with clear felling and restocking. 
In exceptional cases where the loss of individual trees or woodland cover is unavoidable, the Council will require
mitigation measures to be provided. 
Policy 41: Biodiversity 
The Council will seek to protect and enhance all wildlife and wildlife habitats, whether formally designated/protected
or not, taking into account the ecosystems and natural processes in the area. 
The Council will apply the principles of the Planning for Nature: Development Management and Wildlife Guide and will
take account of the Tayside Local Biodiversity Action Plan (LBAP) and relevant national and European legislation
relating to protected species when making decisions about applications for development. 
Proposals that have a detrimental impact on the ability to achieve the guidelines and actions identified in these
documents will not be supported unless clear evidence can be provided that the ecological impacts can be satisfactorily
mitigated. In particular, developers may be required to:
a) ensure a detailed survey is undertaken by a qualified specialist where one or more protected or priority
species is known or suspected. In accordance with the Town and Country Planning (Environmental Impact
Assessment) (Scotland) Regulations 2017, development proposals that could have a significant impact on the
environment may require an Environmental Impact Assessment;
b) demonstrate all adverse effects on species and habitats have been avoided wherever possible. A Landscape
Plan may be required to demonstrate the impact of the development and how good design and site layout can
enhance the existing biodiversity;

Page 202

Ecological Appraisal                                Perth Road, Blairgowrie
A6760                                                                                                                                 November 2024 
- 30 - 
c) include mitigation measures and implementation strategies where adverse effects are unavoidable;
d) enter into a Planning Obligation or similar to secure the preparation and implementation of a suitable long-
term management plan or a site Biodiversity Action Plan, together with long-term monitoring. 
European Protected Species 
Planning permission will not be granted for development that would, either individually or cumulatively, be likely to
have an adverse effect upon European protected species (listed in Annex IV of the Habitats Directive (Directive
92/43/EEC)) unless the Council as Planning Authority is satisfied that:
a) there is no satisfactory alternative; and
b) the development is required for preserving public health or public safety or for other imperative reasons of
overriding public interest including those of a social or economic nature and beneficial consequences of
primary importance for the environment. 
In no circumstances can a development be approved which would be detrimental to the maintenance of the population
of a European protected species at a favourable conservation status in its natural range.
Other Protected Species 
Planning permission will not be granted for development that would be likely to have an adverse effect on protected
species unless it can be justified in accordance with the relevant protected species legislation (Wildlife and Countryside
Act 1981 (as amended) and the Protection of Badgers Act (1992))
Policy 42: Green Infrastructure 
The Council will require all new development to contribute to green infrastructure by:
a) creating new multifunctional green infrastructure, particularly where it can be used to mitigate any negative
environmental impacts of the development, and/or create linkages to wider green and blue networks;
b) incorporating high standards of environmental design;
c) ensuring that development does not lead to the fragmentation of existing green and blue networks;
d) the protection, enhancement and management of existing green infrastructure within and linked to the site
and the incorporation of these into development proposals:
i) open spaces and linkages for active travel or recreation, including links between open spaces and the
wider countryside and the provision of new connections where required;
ii) existing species and habitats and the creation of new habitats and wildlife corridors, including trees,
hedgerows and woodlands where appropriate;
iii) the water environment which is an important contributor to the network of blue and green corridors
for the alleviation of flood risk, wildlife, recreation and the amenity needs of the community. 
The temporary use of unused or underused land as green infrastructure will be encouraged. The use of a site for
temporary green infrastructure will not prevent it from being developed in the longer term.

Page 203

AsphaltGrass
RW 0.9mh
Asphalt
TPS
DKDK
DKDK
Grass
Grass
GRGR
1.0 mh
Unmade
TPS
DKDK
DKDK
Asphalt
Asphalt
Grass
Gravel
Grass
Grass
Grass
Grass
Grass
Grass
Grass
TPS
Asphalt
Asphalt
DKDK
DKDK
TPS
TPS
PRF 
1.0mh
Grass
DKDK
SWSW
0.7 mh
IRF
0.6 mh
IRF
Asphalt
Asphalt
Asphalt
Asphalt
BW 1.0 mh
1.2mh
IRF
TPTP
KDKD
KDKD
GRGR
1.0 mh
Conc
CPS
CPS
DKDK
DKDK
DKDK
DKDK
DKDK
0.6mh
swsw
0.8mh
70.6m
Starbucks
Bespoke
McDonald's
Restaurant
NG50
Entrance
DOT
DOT
DOT
DOT
DOT
LPLP
DOT
DOT
BOL
DOT
DOT
DOT
LPLP
LPLP
LPLP
LPLP
2 no. Grill Bays
38no. Car Parking Spaces
(Inc. 3no. Accessible Bays)
Patio
2 no. Grill Bays
Patio
AcAc
ArAr
AgAg
BpBp
LsLs
AcAc
ArAr
AgAg
BpBp
LsLs
AcAc
New grass verges established with flowering
lawn mix which contains plants which are either
low growing or can be cut low.  Should be cut to
10cm through out the growing season and left to
grow and flower between July and August.
Contains 25 wildflower and 4 grass species.
New native hedgerow and trees
for ecological enhancement
LsLs
R
ArAr
ArAr
Shrubs and tree planting to Perth Road
frontage to soften views of the site
KEY TO LANDSCAPE PROPOSALS
A 30.10.24 Updated in line with ecology recommedations MJB GMGM
Proposed Planting Details
Specimen Tree Planting
Grassland Verges
Areas of grassland to be established in landscaped verges around the site.
Cultivate and grade soil,  bring top 150mm to a fine tilth, rake and bring to
given levels, remove all stones and debris over 50mm, lay turf in stretcher
bond, firm turves using wooden turf beater.
Shrubs (90m²)
Shrubs to be pit planted 4 per m².  Planted to provide colourful,
groundcover with ecological value.  All plants to be 5 litre pot
grown stock, planted in random groups of 5, 7 or 9 plants of
same species throughout the planting bed.  360 plants in total
Euonymus fortunei 'Emerald Gaiety' x 72no.
Brachyglottis 'Sunshine' (Senecio) x 72no.
Ceanothus 'Blue Mound' (Californian lilac) x 72no.
Lavendula angustifolia 'Hidcote' (Lavender) x 72no.
Pachysandra terminalis (Green Carpet) x 72no.
Ornamental Shrub Planting
Areas of shrub planting for ecological enhancement to be planted in groups
around the perimeter of the site.  Cultivate and grade soil,  bring top 150mm
to a fine tilth prior to planting.
Species Rich Grass Verges (327m²)
New areas of grass verge to be established using Scotia
Seeds SCM6 flowering lawn mix which is a local Scottish
seed house, to increase biodiversity.
Contains plants which are either low growing or can be cut
low.  Should be cut to 10cm through out the growing season
and left to grow and flower between July and August.
Contains 25 wildflower and 4 grass species.
ArAr
Specimen trees planted in locations indicated as per the following
specification:
Excavate tree pit 900mm x 900mm x 900mm deep (or larger to suit root ball),
backfill topsoil mixed with 80 litres of peat free compost and secure tree in an
upright position with a single timber stake and rubber tie and spacer.
Specimen Tree Planting (14 no.)
4.5m high, 18-20 cm girth Extra Heavy Standard  root balled
trees (supplied by Barcham Trees or similar approved) to be pit
planted as per above specification in locations shown
3 x Acer campestre (Field Maple) - Ac
4 X Acer rubrum (Red Maple) - Ar
2 x Alnus gutinosa (Alder) - Ag
2 x Betula pendula (Silver birch) - Bp
3 x Liquidamber styraciflua (Sweet Gum) - Ls
Hedge Planting (76 linear metres)
60-80cm high, bareroot transplants, pit planted in double
staggered row including organic compost to backfill pits at 5
plants per linear metre.  Spiral rabbit guards to each plant.
380 plants in total.
40% Crateagus monogyna (Hawthorn) x 152no.
20% Corylus avellana (Hazel) x 76no.
10% Salix caprea (Goat Willow) x 38no.
10% Cornus sanguinea (Dogwood) x 38no.
10% Sambucus nigra (Elder) x 38no.
10% Prunus spinosa (Blackthorn) x 38no.
Native Hedge Planting
A new native hedgerow to be established and maintained at 1.5m high.
Native species selected to provide ecological enhancement and seasonal
All areas of new landscaping to have the existing topsoil and subsoil
decompacted by hand digging or rotorvator.  If any imported topsoil is
required it should be placed to a depth of 450mm minimum in shrub beds
and be free of weeds or any detritus/stones larger than 50mm.
Planting should take place during the dormant planting season ie 1st
October to 28th February.  Tree planting shall be implemented as per British
Standard 8545 (Trees: from nursery to independence in the landscape –
Recommendations.
Proposed Surfacing
Refer to Architects drawing for full details of all new surfacing
Pedestrian Circulation
New tarmacadam surfaced footways
Pedestrian Circulation
New block paving surfaced footways
1 No synthetic tie (100mm below top of stake)
1 No 75mm dia, softwood FSC stake, sharpened
and knocked approx 1.0m into the soil until secure
Tree Pits & Support
300mm topsoil
600mm subsoil
Diameter and depth of tree pit to be dependant on the size of the rootball.
Minimum size 900 x 900 x 900 deep
Project
Title
Client
DescriptionDateRev Drawn
Drawing Status
- This drawing isis copyright and shall not bebe reproduced nor used for any other purpose
without the written permission ofof Encon Associates - This drawing must bebe read inin
conjunction with all other related drawings and documentation - ItIt isis the contractors
responsibility toto ensure full compliance with the relevant Regulations - Until technical
approval has been obtained from the relevant Authorities itit should bebe understood that
all drawings issued are PRELIMINARY and NOT for Construction - Should the contractor
start site work prior toto approval been given, itit isis entirely atat his own risk - DoDo not scale
from this drawing, use figured dimensions only - ItIt isis the contractors responsibility toto
check and verify all dimensions onon site - Any discrepancies toto bebe reported toto Encon
Associates immediately - All survey information isis provided byby the surveying company
and Encon Associates cannot accept any liability for any discrepancies there inin - All
survey information toto bebe verified onon site byby Contractor - For our Standard Terms and
Conditions, please visit www.enconassociates.co.uk/terms - Alternatively, a hard copy
can be posted to you
Encon Associates - DISCLAIMER:c
Checked
Drawn Checked
Date Scale (A1)
Job Number RevDrawing Number
- BREEAM - Code for Sustainable Homes Assessors - Landscape Architecture - Transportation
- Life Cycle Costing - Energy Assessment - SAP - EPC - SBEM - Daylight Calculations
Environmental Consultants to the Construction Industry
Notes:
10 Chapel Lane
Arnold
Nottingham
NG5 7DR
T: 0115 987 55 99 E: enquiries@enconassociates.co.uk      W: www.enconassociates.co.uk
McDonald's
Proposed New Drive Thru
Perth Road
Blairgowrie PH10 6FW
Landscaping Scheme
FOR PLANNING APPROVAL
MBMB LBLB
23.10.24 1:200
A6760 0101 D
This drawing is based on:
· Topographical Survey, reference 4240368-4101-
Blairgowrie-STTBC by Glanville dated June 2024
· 13638_AEW_2473_1004D_Proposed Site Plan by AEW
dated 10.06.25
· Ecological Appraisal by Encon Associates dated
October 2024
B 25.02.25 Updated in line with Rev E site plan MJB GMGM
C 13.06.25 Updated in line with site plan 1004C MJB GMGM
D 27.0625 Updated site plan D plus additional planting MJB GMGM

Page 204

G   
Landscape Management Plan
Proposed Construction of a New McDonald’s Drive Thru Restaurant at:
Perth Road, Blairgowrie PH10 6FW
29th October 2024
Revision A – 13th June 2025 
Report Reference Number: A6760

Page 205

Landscape Management Plan                                                                           McDonald’s Blairgowrie
October 2024  Page |2 
Document Control 
Date of first Issue Revision Date of Revision Author Checked by
29th October 2024 - - MJB LB 
A 13th June 2025 MJB LB

Page 206

Landscape Management Plan                                                                           McDonald’s Blairgowrie
October 2024  Page |3 
Contents
Executive Summary .................................................................................... 4
1 Introduction ........................................................................................ 5
2 Landscape Maintenance Objectives ............................................................ 7
3 Components with Specific Management Objectives ......................................... 8
4 Maintenance Specification ...................................................................... 10
5 Programming of Maintenance and Management Operations ............................... 17
6 British Standards ................................................................................. 21

Page 207

Landscape Management Plan                                                                           McDonald’s Blairgowrie
October 2024  Page |4
Executive Summary
This Landscape Management Plan has been produced for the development of a new
McDonald’s Drive Thru restaurant at Perth Road, Blairgowrie, in respect to the application for
planning consent to the local authority.
This document corresponds directly to the landscaping scheme as detailed on the drawing
reference A6760-01 (see separate drawing).  The plan should also be read in conjunction with
the separate Preliminary Ecological Appraisal.
The development proposes the construction of a new McDonald’s Drive Thru Restaurant,
including the construction of the restaurant, car parking, landscaping and associated works.
The landscaping scheme incudes the planting of new trees, new grass verges and a new native
hedgerow.  Nectar-rich shrubs will be planted to provide a food source for a variety of
pollinator species.
The aim of the report is to provide appropriate prescriptive management and
recommendations to achieve the objective of the landscaping scheme and on-going
maintenance.
This includes management actions and an annual work schedule for the initial 12 month
defects liability period and a further 4 years thereafter.

Page 208

Landscape Management Plan                                                                           McDonald’s Blairgowrie
October 2024  Page |5
1 Introduction
1.1 This management plan has been prepared in respect to the application for planning
permission submitted to the local authority for a new McDonald’s Drive Thru Restaurant
at Perth Road, Blairgowrie.
1.2 This Landscape Management Plan corresponds directly to the landscaping scheme as
detailed on the drawing reference A6760-01 (see separate drawing).  The plan should
also be read in conjunction with the separate Preliminary Ecological Appraisal.
1.3 The Plan is in accordance with BS8545:2014 Trees: from nursery to independence in the
landscape – Recommendations. This British Standard gives recommendations for
transplanting young trees successfully from the nursery, through to achieving their
eventual independence in the landscape, specifically covering the issues of planning,
design, production, planting and management.
This British Standard applies to trees where a distinct crown has been prepared in the
nursery.  It does not apply to whips, transplants and seedlings or to other woody
material.  
1.4 Principles of the Maintenance Schedule
This document sets out the principles and quality standards required for the installation
of planting and ecological enhancement for the long term management operations. 
It includes: 
• Design Intentions
• Aims of the management plan
• Detailed installation specification
• Management objectives
• Detailed maintenance specification 
• Annual schedule of operations 
1.5 The report should be read alongside the approved landscaping scheme and used by the
maintenance team to produce a detailed priced programme of work for the client.  It
should also form the basis for annual reviews and evaluation of maintenance works to
ensure they continue to meet the needs of the site.

Page 209

Landscape Management Plan                                                                           McDonald’s Blairgowrie
October 2024  Page |6
1.6 Long Term Landscape Design Objective
The design intention for the landscape and ecological enhancement at this site is to
create a coherent environment and attractive setting, not only for the customers of the
restaurant but also for the ecological enhancement of the site as a whole.  The scheme
is sympathetic to the current landscape setting which includes areas of commercial and
residential use, as well as a large cemetery, and aims to provide an enhanced external
environment and biodiversity.
1.7 Aims of the Landscape Proposals
The landscape and its relationship with the new building is important to the success of
the scheme. The design successfully integrates the new building into a cohesive external
environment within the existing landscape. The overall design aim is for the new
building and landscape to be logically linked, mainly influenced by the need for efficient
circulation routes and a welcoming frontage.  
1.8 For the purposes of management and maintenance of the landscape and biodiversity
there are the following main areas: 
1) Trees
2) Grass Verges
3) Ornamental Shrubs
4) Native Hedge

Page 210

Landscape Management Plan                                                                           McDonald’s Blairgowrie
October 2024  Page |7
2 Landscape Maintenance Objectives 
2.1 The Maintenance Period
Maintenance is to be undertaken for the next 5 years as a minimum, including the initial
12 months defects liability period which should be built into the implementation
contract to cover post-installation maintenance requirements for the whole of the
landscape works.  During this period the contractor is responsible for all horticultural
maintenance operations, including the replacing of planting which has failed to flourish.
At the end of the initial one-year aftercare period any defects in soft landscape
materials due to materials or workmanship will be rectified and future responsibility
will be handed over to the person responsible for grounds maintenance at the site
thereafter and any trees or plants which die, are removed or become seriously damaged
or diseased, shall be replaced in the next planting season with others, of similar size
and species. 
2.2 Access 
For landscape maintenance purposes, vehicular access will be from the access road into
the new development linked to Perth Road (A93).
2.3 Facilities 
The grounds maintenance contractor shall liaise with the site management directly
regarding permissions for parking, storage, use of water and any other resources. 
2.4 Maintenance Objectives for Soft Landscape 
• apply good horticultural and ecological practice to all operations
• promote healthy growth and establishment of all plants and trees
• regularly cut grass areas to maintain a neat, short sward
• ensure consistent control of invasive weeds
• promote optimum display and flowering periods and stem colour
• ensure development of optimum plant form, shape, and planting density provide
protection against pests and diseases
• promote wildlife value and species diversity where appropriate
• ensure long term commitment to replacement of defective plant material

Page 211

Landscape Management Plan                                                                           McDonald’s Blairgowrie
October 2024  Page |8
3 Components with Specific Management Objectives 
3.1 Grass Verges: Turfed with species rich turf
• Ensure sward is maintained so as to create an optimum functional surface
• Review requirements for whole or part sward refurbishment
• Establish an annual programme of aeration and feeding
• Review requirements for whole or part sward refurbishment
• Employ cultural techniques which use organic fertilisers and minimize the use of
chemicals wherever possible
3.2 Shrub Planting: Ornamental shrubs planted in groups
Refer to drawing reference A6760-01 (see separate drawing) for full species list to
determine correct management approach to create functioning habitats, for example
dense blocks of ground cover species will not require pruning.
• Species selected for ecological enhancement including colourful, flowering
groundcover to attract bees and invertebrates
• Ensure that good horticultural practice is employed to encourage long term
health and vitality of all shrub planted areas to ensure they establish
• Allow shrubs to establish to provide a dense block of groundcover with a variety
of species and various heights for biodiversity
3.3 Tree Planting: Planted as individual specimens
• Ensure that good horticultural practice is employed to encourage long term
health and vitality of all trees
• Ensure well-balanced crowns and natural shape
• Remove rubber ties and supporting stakes once the trees area well established
enough to support themselves
3.4 Native Hedgerow Planting: Species rich native hedge 
• Native species selected to provide ecological enhancement including Hawthorn
and Hazel (see landscape drawing A6760-01 for exact species list)
• The native hedge should be managed for its wildlife interest with only 50% cut
annually on rotation, to allow fruits and shelter for birds and insects through the
winter

Page 212

Landscape Management Plan                                                                           McDonald’s Blairgowrie
October 2024  Page |9
• The hedge should be cut to form an A-frame shape to avoid it becoming leggy
and diminishing its biodiversity value
• Hedges should be pruned in late winter (February) to prevent destroying berries
and seeds vital food for birds, as well as the eggs of overwintering insects
• Cutting should not take place during the bird nesting season (March to August)
• Good horticultural practice should be employed to encourage long term health
and vitality of all hedge planting
• Allow shrubs to establish to provide a dense hedge line maintained at 1.5m high

Page 213

Landscape Management Plan                                                                           McDonald’s Blairgowrie
October 2024  Page |10
4 Maintenance Specification 
4.1 Maintenance Details
The following specification items are to be addressed within the long term landscape
maintenance contract.  Included are performance specifications, quality standards and
some detailed operational descriptions.  The landscape maintenance contractor will be
required to apply their expertise in relating these to the Management Objectives above
in producing annual programmes of work. 
4.2 Maintenance to accord with requirements of BS 7370:1991 
• Duration: Carry out the operations in the following clauses from completion of
planting and continue in perpetuity (unless otherwise agreed by the Local
Planning Authority)
• Frequency of maintenance visits: Monthly during growing season and as per
schedule in clause 5.3 
4.3 Tree Planting: trees planted as individual specimens 
Specification for Specimen Tree Planting:
• Refer to the landscaping drawing reference A6760-01(see separate drawing) for
species and planting locations.
• For trees in closer proximity to adjacent paving where the risk of damage caused
by future root growth could be an issue, the trees should be planted within a
“root deflection” system to be utilised to divert roots downwards to a level
where they can safely establish without surface damage.
• All trees to be supplied in accordance with Section 8.4 “Root system
development and management” within BS8545:2014 Trees: from nursery to
independence in the landscape – Recommendations
• Specimen trees to be pit planted in accordance with Section 10 “Planting” within
BS8545:2014 Trees: from nursery to independence in the landscape -
Recommendations.
• All trees to be "Extra Heavy Standard" root balled trees, 18-20cm girth, 4.5m
high (supplied by Barcham Trees or similar approved)

Page 214

Landscape Management Plan                                                                           McDonald’s Blairgowrie
October 2024  Page |11
4.4 Native Hedge Planting: a new native hedgerow to be established to provided ecological
enhancement and seasonal interest
Specification for Native Hedge Planting:
• Plants to be 60-80cm bareroot transplants, pit planted at 5 plants per linear
metre in a double staggered row with organic compost
• Spiral rabbit guards for each plant with bark mulching between plants to
suppress weed growth
• Maintain at 1.5m high
4.5 Shrub Planting: Ornamental Shrubs
Specification for Shrub Beds:
• Refer to the landscaping drawings A6760-01 (see separate drawing) document
for species and planting locations.
• All plants to be 5 litre pot grown stock, planted in random groups of 5, 7 or 9
plants of same species throughout the planting bed.
• Cultivate and grade soil, bring top 150mm to a fine tilth prior to planting 
• Shrubs to be pit planted at 4 per m2
4.6 Tree, Hedge & Shrub Maintenance: 
• Trees, hedges and shrubs to be maintained by the landscape contractor
appointed by the developer in accordance with Section 11 “Post-planting
management and maintenance” within BS8545:2014 Trees: from nursery to
independence in the landscape - Recommendations.
Watering: 
• The timing and frequency of irrigation should take into account the prevailing
weather conditions, soil moisture release characteristics and the response of the
tree species to water deficits or periods of prolonged soil saturation.
• Ensure sufficient water is applied to maintain healthy growth; taking into
account published meteorological data on rainfall for any given period, in
particular in periods of spring and summer drought (April to August)

Page 215

Landscape Management Plan                                                                           McDonald’s Blairgowrie
October 2024  Page |12
Quantity:
• Standard trees:  a general guide would be10 gallons per tree per application. 
However, the frequency of irrigation is more important than the volume of water
given at any one time
• Shrubs: Wet soil to full rooting depth
• Monitoring should take place if there are 10 consecutive days during the growing
season at >250C
Weed control: 
• All planting areas shall be kept clear of weed growth for the first 3 growing
seasons during the establishment period
• After 3 years, a herb layer can be allowed to return to all planting except the
ornamental planting which should be kept weed free
• Achieve by a combination of herbicide applications and hand-weeding/hoeing
• Ensure that the methods used will cause a minimum of damage to adjacent
planted areas
Tree and plant stems: 
• Do not allow nylon filament rotary cutters or other mechanical tools closer than
200mm to the stem of any tree or plant
• Maintain a grass & weed-free area around the base of each tree, min diameter
500mm during the first 3 growing seasons during the establishment period
• Carry out operations close to stems using hand tools
Herbicide application: 
• A foliar acting translocated or contact herbicide shall be applied to emergent
weeds
Hand weeding: 
• Hoe and loosen the soil throughout the planting areas, taking care to avoid
disturbance of roots of planted material
• Remove weeds entirely, including roots
• Remove the minimum of soil and minimise disturbance to plants, bulbs and
mulched surfaces

Page 216

Landscape Management Plan                                                                           McDonald’s Blairgowrie
October 2024  Page |13
• On completion, rake areas to a neat condition
Mulch: 
• All mulches should be replenished to their original depth of 75mm
• The mulched area around the tree should be enlarged, if practicable, as the tree
develops to the canopy drip line
• Mulch spill on adjacent surfaces to be removed to avoid a build up of mulch
around the root flare and the base of the stem
• Any weeds and debris to be taken out of the spilled mulch before returning to
planted areas
• Melcourt ‘Forest BioMulch’ or similar approved to be used
• After 5 years any compost created on site should be used if possible
Re-firming, check/tidy: 
• Trees and shrubs shall be maintained in a firm position in the ground and all
stakes and ties shall be checked regularly, particularly after strong winds, frost
heave and other disturbances
• The soil around newly planted trees should be regularly inspected for soil capping
or compaction.  
• All trees should be checked on a regular basis for mammal, human and other
external damage
• All trees should be checked on a regular basis for pests and diseases
• Any significant failures should be reported and remedial action should be taken
as necessary
Tree stakes and ties: 
• Inspect all trees twice a year to ensure that the root system remains stable and
firm in the ground and that ties are still effective and not causing damage
• Adjust fixing to suit stem growth and provide correct and uniform tension.  Any
stakes and ties that are found to be not fit for purpose should be adjusted,
replaced or removed.
• If growth is sufficient for tree to be self-supporting, remove fixing and fill holes
with lightly compacted soil
• Check stakes for looseness, breaks and decay and replace as necessary

Page 217

Landscape Management Plan                                                                           McDonald’s Blairgowrie
October 2024  Page |14
• Remove stakes and ties once tree has established sufficiently to support itself or
after 3 years establishment whichever is the sooner
Hedge Pruning: 
• Generally to be carried out in accordance with good horticultural and
arboricultural practice
• In accordance with BS 7370.4, clauses 3.6.3 to 3.6.5
• Before starting work, agree which shrubs and hedges are to be pruned.
• 50% of hedges are to be cut annually on a rotational basis, ie 50% cut in year 1,
50% left uncut and then alternated for year 2 and all subsequent years.
• Hedges to be cut to an A-frame shape
• Trim individual plant appropriate to species, location and season to leave a well-
balanced natural shape
• All cutting to be done with appropriate clean sharp tools
• Clean cuts back to sound wood
• Do not use growth retardants, fungicides or sealant unless instructed
Pruning of trees: 
• In accordance with BS 3998 and Forestry and Arboriculture
• During pruning protect adjacent structures, plants or trees
• Trees to be maintained with a well-balanced natural appearance
• Remove any suckers or basal growth
• Cut back level with source stem or root
• For any chain saw work, operatives must hold a certificate of competence
Timing: 
• Prune between leaf fall and mid winter
• After 3 years full growing seasons, selectively thin, re-space and crown raise
trees
Pruning of shrubs:
• At the end of the growing season, check all shrubs and remove all dead foliage,
dead wood and broken/damaged branches and stems

Page 218

Landscape Management Plan                                                                           McDonald’s Blairgowrie
October 2024  Page |15
• Prunings to be retained on site and either composted or woodier prunings to be
utilised in the creation of habitat piles in un-obtrusive areas if possible
• Unless otherwise specified or instructed, prune shrubs flowering between March
and July immediately after the flowering period and shrubs flowering between
July and October back to old wood in winter; 
Reinstatement: 
• Remove dead plants as soon as possible and replace in the next scheduled round
of replacement planting during the dormant season 
Maintaining a safe, clean and secure environment: 
• Litter and dog waste to be collected as necessary to maintain a clean, litter-free
environment
• Include clear signage against dog fouling and litter at entrances
• Report fly tipping
4.7 Grass Verges: areas of grassland to be established in landscaped verges around the site
Specification for Grass Verges:
• Culitvate and grade the soil, bring top 150mm to a fine tilth, rake and bring to
given levels.  Remove all stones and debris over 50mm
• Lay turf in stretcher bond, firm turves using wooden turf beater
Watering and Feeding: 
• This biodiverse turf is treated in the same way as a conventional lawn and should
be regularly watered and fertilised
• Newly laid turf for grass verges and existing grass areas which have been re-
seeded to be well watered at time of laying/seeding and regular watering
thereafter during the first 2 growing seasons to ensure healthy establishment of
the grass
• Ensure sufficient water is applied to maintain healthy growth; taking into
account published meteorological data on rainfall for any given period, in
particular in periods of summer drought (June, July & August)
• Slow release fertiliser to be spread over grass areas in accordance with
manufacturer’s instructions

Page 219

Landscape Management Plan                                                                           McDonald’s Blairgowrie
October 2024  Page |16
• Carry out a single application between March and May for the first 3 years after
laying
Weed control: 
• All grass to be kept clear of weed growth for the first 3 growing seasons during
the establishment period
• Achieve by a combination of herbicide applications and hand-weeding
• Ensure that the methods used will cause a minimum of damage
Mowing: 
• This biodiverse turf is treated in the same way as a conventional lawn and should
be regularly mown to maintain the sward to create an optimum functional
surface
• Grass verges are to be cut a minimum of 15 times during the growing season
usually between March and October, depending on weather conditions
• Cut grass should be removed from paved areas at the time the grass is cut
• Strimming around obstacles such as trees or furniture to be carried out early in
the growing season and then herbicide applied around the base of trees and
obstacles in April/May and again in September/October to prevent weed or grass
growth

Page 220

Landscape Management Plan                                                                           McDonald’s Blairgowrie
October 2024  Page |17
5 Programming of Maintenance and Management Operations
5.1 Monitoring
To protect the investment in the quality of soft and hard landscape works, the long term
maintenance contractor must provide a high standard of maintenance.  The long term
success of the scheme is dependent on its maintenance regime.  The management plan
and maintenance operations included herewith will be reviewed on letting of the long
term maintenance contract following the end of the initial contract works defects
period and from then on a four yearly basis thereafter.
5.2 Schedule of Maintenance
The following is an indicative annual schedule of maintenance visits.  This provides a
reasonable frequency of the more common operations, and a good indication of the
required level of intensity of management required but is not intended to be fully
comprehensive or restrictive. The landscape contractor is required to construct a
schedule of operations specifying operations and frequency using their own experience
and horticultural knowledge.  The ongoing programme of maintenance work will also
include proposed frequency of visits and operations detailed in the specification, i.e.
pruning. It shall also include scheduled dates for: 
• Infrequent operations such as re-spacing of plants, pruning, topping up of mulch,
replacement of plants/restocking of beds etc
• Planting review and refurbishment
• Monitoring and review; the effectiveness of the management operations is to be
closely and continually monitored and reviewed annually against this
Specification and Landscape Maintenance Plan, with any resulting changes
incorporated into the subsequent years’ programme. 
5.3 Schedule of annual maintenance operations
The following schedules list the timings for key annual operations for the soft landscape
areas as shown on the proposed landscaping plan:

Page 221

Landscape Management Plan                                                                           McDonald’s Blairgowrie
October 2024  Page |18
Schedule 1: General Maintenance
Month Litter pick Remove leaf fall Check Paving
January 1 visit  
February 1 visit  
March 1 visit  
April 1 visit  
May 1 visit  
June 1 visit  1 visit
July 1 visit  
August 1 visit  
September 1 visit  
October 1 visit 1 visit 
November 1 visit  
December 1 visit 1 visit 
Schedule 2: Specimen Trees & Hedgerows – Establishment Phase (first 3 years) 
Month Tree
inspection
Replace
dead
Weed
control Watering Hedge
cutting
January     
February     1 visit
March     
April   2 visits 2 visits 
May    4 visits 
June    4 visits 
July 1 visit  2 visits 4 visits 
August    4 visits 
September    4 visits 
October   2 visits 2 visits 
November     
December  1 visit

Page 222

Landscape Management Plan                                                                           McDonald’s Blairgowrie
October 2024  Page |19
Schedule 3: Specimen Trees & Hedgerow – Continuing Maintenance after 3 years
Month Tree
inspection
Replace
dead
Weed
control Watering Hedge
cutting
January     
February     1 visit
March     
April   1 visit 2 visits 
May    2 visits 
June    2 visits 
July 1 visit  1 visit 2 visits 
August    2 visits 
September    2 visits 
October   1 visit 2 visits 
November     
December  1 visit   
Schedule 4: Ornamental Shrubs - Establishment Phase (first 3 years)
Month
Inspection
for dead
plants
Replace
dead
Weed
control Watering
Deadhead
flowering
plants
January     
February     
March   1 visit  
April   1 visit 2 visits 1 visit
May   2 visits 4 visits 1 visit
June   2 visits 4 visits 1 visit
July   2 visits 4 visits 1 visit
August   2 visits 4 visits 1 visit
September 1 visit  1 visit 4 visits 1 visit
October  1 visit 1 visit 2 visits 
November     
December

Page 223

Landscape Management Plan                                                                           McDonald’s Blairgowrie
October 2024  Page |20
Schedule 5: Ornamental Shrubs - Continuing Maintenance after 3 years
Month
Inspection
for dead
plants
Replace
dead
Weed
control Watering
Deadhead
flowering
plants
January     
February     
March   1 visit  
April   1 visit 2 visits 1 visit
May   1 visit 2 visits 1 visit
June   1 visit 2 visits 1 visit
July   1 visit 2 visits 1 visit
August   1 visit 2 visits 1 visit
September 1 visit  1 visit 2 visits 1 visit
October  1 visit 1 visit 2 visits 
November     
December     
Schedule 6: Grass Verges & Open Spaces
Month Weed
control Fertilizer Mowing Trim
edges
Thatch
removal Watering
January      
February      
March   3 visits  1 visit 
April  1 visit 4 visits 2 visits  
May 1 visit  4 visits 2 visits  4 visits
June   4 visits 2 visits  4 visits
July   4 visits 2 visits  4 visits
August   4 visits 2 visits  4 visits
September 1 visit 1 visit 4 visits 2 visits  
October   3 visits 2 visits  
November      
December

Page 224

Landscape Management Plan                                                                           McDonald’s Blairgowrie
October 2024  Page |21
6 British Standards 
6.1 As well as the standards described above the soft landscape works should meet the
following British Standards where appropriate: 
Topsoil handling, stripping and storage:
• BS ISO 15799:2022 Soil quality - guidance on ecotoxicological characterization of
soils and soil materials
• BS 3882:2015 Specification for topsoil
• BS 4428:1989 guide of practice for general landscape operations (excluding hard
surfaces) AMD 6784
Quality of Trees and Shrubs: 
• BS 3936-1:1992 Nursery stock specification for trees and shrubs
• BS 3936-10:1990 nursery stock specification for ground cover plants
• BS 3998:2010 recommendations for tree work and AMD 6549 
Horticulture:
• BS EN 12579:2013 Soil improvers and growing media – sampling
• BS EN 13037:2011 Soil improvers and growing media - determination of pH

Page 225

Odour Assessment
New McDonald’s Restaurant at 
Perth Road, Blairgowrie 
28th October 2024
Rev D 2 July 2025
Report Reference Number: A6760

Page 226

Odour Assessment                                                                                                                              Perth Road, Blairgowrie
A6760                                                                                                                                       August 2024
- 2 - 
Document Control 
Date of first Issue Revision Date of Revision Issued By Checked by
28th October 2024 - - JK MJB 
A 11th November 2024 JK MJB 
B 20th February 2025 JK MJB 
C 13th June 2025 JK MJB 
D 2nd July JK MJB

Page 227

Odour Assessment                                                                                                                              Perth Road, Blairgowrie
A6760                                                                                                                                       August 2024
- 3 - 
Executive Summary
Encon Associates were commissioned by McDonalds to carry out an odour assessment in
connection with the proposed new McDonalds restaurant on land off Perth Road, Blairgowrie,
Scotland (the ‘Site’).
This report has been updated with the new Proposed Site Plan, 13638_AEW_2473_1004C, dated
06.06.25.
An assessment of odour from the proposed kitchen facility has been undertaken using the EMAQ+
‘Guidance on the Control of Odours and Noise from Commercial Kitchen Exhaust Systems’. 
Based on the risk assessment criteria, the proposed kitchen facility is identified as having a High
Risk of producing odour impacts at adjacent receptors. To ensure an adequate level of odour
control an extraction system will be installed within the kitchen incorporating the following features:
• stainless steel extract canopy;
• Electrostatic precipitator (ESP);
• Purified Air UV-0 1000 ozone generator units;
• Unrestricted high velocity discharge flue with extract rate of 15m/s terminating at least 1m
above roof level;
• Access doors within ducting system at intervals of at least 1.2m to allow easy access for
cleaning. 
In addition, an effective maintenance program will be implemented including regular cleaning of grill
and fryer hoods, ducting, filters, ESP and Ozone units.
Based on the above extraction system and maintenance program it is considered that odour
emissions will be effectively controlled, and no adverse effects will be experienced at nearby
sensitive receptors.

Page 228

Odour Assessment                                                                                                                              Perth Road, Blairgowrie
A6760                                                                                                                                       August 2024
- 4 - 
Table of Contents
1 Introduction .................................................................................... 5
1.1 General ............................................................................................................. 5
1.2 Scope of the Assessment ..................................................................................... 5
2 Site Description ................................................................................ 6
2.1 The Existing Site ................................................................................................. 6
2.2 Proposed Development ........................................................................................ 8
3 Policy Context ................................................................................. 10
3.1 Environmental Protection Act 1990 ...................................................................... 10
3.2 SEPA Odour Guidance ........................................................................................ 10
3.3 IAQM Odour Guidance ....................................................................................... 11
3.4 Guidance on the Control of Odour from Commercial Kitchen Exhaust Systems .......... 11
4 Methodology ................................................................................... 12
4.1 Odour Assessment ............................................................................................ 12
5 Odour Risk Assessment ...................................................................... 15
5.1 Mitigation of Odour ........................................................................................... 16
6 Conclusion ..................................................................................... 18
Appendix A  ......................................................................................... 19

Page 229

Odour Assessment                                                                                                                              Perth Road, Blairgowrie
A6760                                                                                                                                       August 2024
- 5 - 
1 Introduction
1.1 General
Encon Associates were commissioned by McDonalds to carry out an odour assessment in
connection with the proposed new McDonalds restaurant on land off Perth Road, Blairgowrie,
Scotland (the ‘Site’).
The Site falls within the district of Perth and Kinross Council (PKC) on the western edge of the town
of Blairgowrie, within the Westpark Retail Estate. 
This report assesses odour impacts associated with the proposed development. Potential sources
of emissions are identified and assessed in the context of the nature and location of receptors.
1.2 Scope of the Assessment
The application is for the construction of a new McDonalds restaurant with associated drive-thru
facility and parking.  A commercial kitchen will be included as part of the restaurant facilities. There
is the potential for odour emissions to occur during opening times therefore an odour assessment
has been undertaken in accordance with the EMAQ+ guidance on the ‘Control of Odour and Noise
from Commercial Kitchen Exhaust Systems’1 to assess the potential for odour nuisance at nearby
sensitive receptors and ensure odour control measures will meet the requirements of the guidance
and prevent odour at adjacent properties. 
1 Ricardo EMAQ+ (2022) Control of Odour and Noise from Commercial Kitchen Exhaust Systems, 2nd Edition, 6th May 2022

Page 230

Odour Assessment                                                                                                                              Perth Road, Blairgowrie
A6760                                                                                                                                       August 2024
- 6 - 
2 Site Description 
2.1 The Existing Site
The Site is located on the south- western edge of Blairgowrie, within the Westpark Retail Park, west
of Perth Road. The Site lies on the northern side of the retail park opposite Starbucks Drive-thru. 
The Site currently consists of an area of scrub land and is bounded by Perth Road to the east, the
wider retail park to the south, scrub land to the north and west with an area of woodland beyond and
a residential area to the east which includes the St Stephens RC Primary School and Blairgowrie
Community Campus. 
The nearest residential receptors are approximately 25 m to the east, while the school and
surrounding outside space lie approximately 70 m to the east. 
The location of the Site is shown, bounded in red, in Figure 2.1.

Page 231

Odour Assessment                                                                                                                              Perth Road, Blairgowrie
A6760                                                                                                                                       August 2024
- 7 - 
Figure 2.1: Location of proposed development site

Page 232

Odour Assessment                                                                                                                              Perth Road, Blairgowrie
A6760                                                                                                                                       August 2024
- 8 - 
2.2 Proposed Development
2.2.1 Site Layout
An application is being submitted for the construction of a purpose-built, drive-thru restaurant with
drive-thru lane and car park area. 
Access to the Site will be via the existing access road into the northern part of the retail park to the
north of the existing Starbucks Drive-thru. A Drive-thru Lane will be provided running round the
boundary of the Site in a clockwise direction and a central car park area. The restaurant building will
be located on the eastern side of the Site immediately adjacent to Perth Road.  
The restaurant will include a front of house seating area and commercial kitchen.
An indicative site layout of the Site is shown in Figure 2.2.
A high velocity exhaust flue connected to the ventilation and extraction system will terminate 1 m
above the roof level, with the kitchen extract system being located above the kitchen area within the
roof space or at roof level.
Figure 2.2: Layout of Site

Page 233

Odour Assessment                                                                                                                              Perth Road, Blairgowrie
A6760                                                                                                                                       August 2024
- 9 - 
2.2.2 Kitchen Facilities
The kitchen will be located on the south-western side of the building, as detailed in Figure 2.3 and
will include the following equipment:
• Large kitchen store with freezer and chiller
• Commercial counter refrigerator units
• VAT friers with associated overhead VAT extraction Hood
• Dishwasher and washing machine
• Egg cooking equipment
• Single chassis grills with 2 x overhead grill hoods
• Muffin toasters, bun rack, protein steamer and hash brown trolley
• Drinks stations providing hot and cold drinks
• Ventilation and extraction system with odour control
• Rear coral providing a waste storage area.
The kitchen will be fitted with an extraction system with odour control connected to the extract flue.

Page 234

Odour Assessment                                                                                                                              Perth Road, Blairgowrie
A6760                                                                                                                                       August 2024
- 10 - 
3 Policy Context
3.1 Environmental Protection Act 1990
Part III of the Environmental Protection Act (1990)2 contains the main legislation on statutory
nuisance and allows local authorities and individuals to take action to prevent statutory nuisance.
Section 79 of the Act defines, amongst other things, dust, steam, smell or other effluvia emitted from
industrial, trade or business premises so as to be prejudicial to health or a nuisance. Statutory
nuisance is defined as:
• ‘fumes or gases emitted from a premises so as to be prejudicial to health or a nuisance; and
• ‘any dust, steam, smell or other effluvia arising on industrial, trade or business premises and
being prejudicial to health or a nuisance. 
Statutory nuisance is not intended to secure a high level of amenity but rather to act as a basic
safeguard standard that is intended to deal with excessive emissions. The test for considering
whether a process presents a statutory nuisance relies upon considering a range of factors
including the character of the locality, the frequency, duration and intensity of the impact. 
Local Authority Environmental Health/Environmental Protection Officers have a duty to inspect their
districts from time to time for statutory nuisance. They also have a duty to investigate any complaint
of an alleged dust nuisance from the public. Once the authorised officer has formed the view that a
statutory nuisance exists, the local authority has a statutory duty to serve an abatement notice on
those responsible for the nuisance, requiring the nuisance to be abated.
Failure to comply with an abatement notice is an offence and if necessary, the local authority may
abate the nuisance and recover expenses. 
3.2 SEPA Odour Guidance
The odour guidance published by Scottish Environment Protection Agency (SEPA)3 provides
guidance on preventing, investigating and managing odours from commercial and industrial
facilities. The guidance provides useful information on understanding odours, managing emissions
and assessing odour effects, however the guidance has been produced specifically for SEPA
officers engaged in regulating odorous activities, setting out the recommended approach to the
regulation of odorous substances from activities which fall under the regulatory remit of the agency. 
2 Secretary of State, The Environment Act 1990 HMSO
3 SEPA (2010) Odour Guidance 2010, Version 1, January 2010

Page 235

Odour Assessment                                                                                                                              Perth Road, Blairgowrie
A6760                                                                                                                                       August 2024
- 11 - 
Although the guidance provides useful information on understanding and assessing odours it does
not provide guidance on assessing odours within the planning process.
3.3 IAQM Odour Guidance
On 20th May 2014 the Institute of Air Quality Management (IAQM) released guidance on the
assessment of odour for planning4 which was updated in 2018.
The guidance is for assessing odour impacts for planning purposes. It provides background
information relating to requirements for odour impact assessments and suitable impact criteria and
draws from other sources of information such as that described in Environment Agency H4 odour
management guidance5. 
3.4 Guidance on the Control of Odour from Commercial Kitchen Exhaust Systems
Problems associated with nuisance odour from commercial kitchen exhausts are a common
problem, particularly in urban areas where housing may be adjacent to a catering premises. The
Control of Odour from Commercial Kitchens guidance document published by Ricardo EMAQ+ in
May 2022 and which updates the 2005 DEFRA guidance, provides best practice techniques to
minimise odour from kitchen exhaust systems.
The guidance provides a background into odour, the potential sources and effects of odour from
kitchens and the regulatory roles in assessing and controlling odour. The document also sets out
the best practice for the design and operation of commercial ventilation systems and the control of
grease odour and noise emissions.  
Appendix 3 of the Guidance sets out a risk assessment that can be used to identify the likelihood of
odour nuisance occurring from a commercial kitchen facility and to assist in determining appropriate
odour control requirements based on the operations carried out at the selected premises. 
4 IAQM (2018) Guidance on the Assessment of Odour for Planning
5 Environment Agency (2011) H4 Odour Management – How to comply with your environmental permit

Page 236

Odour Assessment                                                                                                                              Perth Road, Blairgowrie
A6760                                                                                                                                       August 2024
- 12 - 
4 Methodology
4.1 Odour Assessment
4.1.1 Introduction
A risk assessment of the proposed activities has been carried out to identify the likely potential for
odour to arise from the Site following the installation and operation of the restaurant and associated
kitchen facilities. 
Unlike other air pollutants, odour impacts cannot be easily monitored either at the point of emission
or at the point of impact. Furthermore, odour impacts are highly subjective; a level of odour which
can lead to complaints from one resident may be acceptable to a neighbouring resident. This makes
it less straight forward to determine what level of emission is acceptable or what constitutes a
significant impact. However, current guidance has been used to undertake the risk assessment and
a level of professional judgement used to determine whether the proposed restaurant is likely to
cause a significant impact at neighbouring properties.
The assessment is based on a desktop review of the proposed restaurant layout (Figure 2.3), the
location of the restaurant in relation to nearby sensitive receptors (i.e. residential properties), the
type of food being prepared, and any kitchen extract system being proposed. 
4.1.2 Methodology
Odour Risk Assessment (EMAQ+ Guidance)
An odour risk assessment of the on-site catering facilities has been carried out according to the
methodology given in the EMAQ+ guidance, as recommended within the IAQM guidance. A simple
risk assessment has been undertaken using the criteria set out in Appendix 3 of the guidance, which
is reproduced in Table 4.1 below. This provides an indication of the level of odour likely to occur
from the on-site kitchen facilities and allows a significance score to be calculated based on the
identified level of risk of odour impacts at adjacent receptors. 
The significance score is used to identify the Impact Risk as set out in Table 4.2. The identified risk
has been used to determine an appropriate extraction system to prevent odour effects at nearby
receptors.

Page 237

Odour Assessment                                                                                                                              Perth Road, Blairgowrie
A6760                                                                                                                                       August 2024
- 13 - 
Table 4.1: Risk Assessment of Odour from on-site Kitchen Facilities
Criteria Descriptive
Score
Significance
Score
Details
Dispersion Very Poor 20 Low level discharge, discharge into courtyard or
restriction on stack
Poor 15 Not low level but below eaves, or discharge below
10 m/s
Moderate 10 Discharging 1 m above eaves at 10-15 m/s
Good 5 Discharging 1 m above ridge at 15 m/s
Proximity of
receptors
Close 10 Closest sensitive receptor less than 20 m from
kitchen discharge
Medium 5 Closest sensitive receptor between 20 and 100 m
from kitchen discharge
Far 1 Closest sensitive receptor more than 100 m from
kitchen discharge
Size of
Kitchen
Large 5 More than 100 covers or large sized take away.
Medium 3 Between 30 and 100 covers or medium sized take
away.
Small 1 Less than 30 covers or small take away.
Cooking
type (odour
and grease
loading)
Very high 10 Pub (high level of fried food), fried chicken, burgers
or fish & chips. Turkish, Middle Eastern or any
premises cooking with solid fuel.
High 7 Vietnamese, Thai, Indian, Japanese, Chinese,
steakhouse.
Medium 4 Cantonese, Italian, French, Pizza (gas fired)
Low 1 Most pubs (no fried food, mainly reheating and
sandwiches etc), tea rooms

Page 238

Odour Assessment                                                                                                                              Perth Road, Blairgowrie
A6760                                                                                                                                       August 2024
- 14 - 
Table 4.2: Odour Impact Risk and Level of Control
Impact Risk Odour Control
Requirement
Significance Score1
Low to Medium Low level odour control Less than 20
High High level of odour control 20 to 35
Very High Very high level of odour
control
More than 35
1 based on the sum of contributions from dispersion, proximity of receptors, size of kitchen
and cooking type, as set out in Table 4.1

Page 239

Odour Assessment                                                                                                                              Perth Road, Blairgowrie
A6760                                                                                                                                       August 2024
- 15 - 
5 Odour Risk Assessment 
It is assumed that the proposed restaurant would provide over 100 covers per day. As shown in the
plan set out in Figure 2.3, the kitchen will be located on the eastern side of the building with the
extract system terminating at roof height with the discharge flue being approximately 1 m above roof
level on the western side of the roof. 
The nearest residential properties are located approximately 25m to the east of the kitchen area. 
A risk assessment of the potential for odour to occur from the proposed kitchen facilities, carried out
in accordance with the EMAQ guidance, is provided below in Table 5.1. 
Table 5.1: Risk Assessment for Odour from Proposed Restaurant
Criteria Descriptive
Score
Significance
Score
Details
Dispersion  good 5 The kitchen extract flue would be located
at least 1m above the roof level and
emissions would be discharged vertically
allowing for free flow of the emissions
plume to disperse without disruption from
adjacent structures and without undue
disruption as a result of wind turbulence
which can be created by an obstruction.
Furthermore, the discharge velocity would
be at least 15 m/s. Dispersion is therefore
considered to be good based on
professional judgement.
Proximity of
receptors
Medium 5 The nearest sensitive receptors are 25m
from the restaurant to the east of the Site.  
Note: There is consent for a residential
development to the north of the Site which
at the time of writing has yet to be built
which is approximately 15m from the
restaurant with a significance score of 10

Page 240

Odour Assessment                                                                                                                              Perth Road, Blairgowrie
A6760                                                                                                                                       August 2024
- 16 - 
Criteria Descriptive
Score
Significance
Score
Details
Size of
Kitchen
Large 5 Assumed that the restaurant would
provide more than 100 covers per day.
Cooking
type (odour
and grease
loading)
Very High 10 The restaurant would serve a high level of
fried food (i.e. chips) plus burgers.
Total
Score
High 25 Overall score indicates a high risk of
odour at adjacent receptors. 
Based on the risk assessment criteria (Table 4.1), the proposed kitchen facility is identified as
having a High Risk of producing odour impacts at adjacent receptors. This is due to the size of the
restaurant, type of food served and the proximity of sensitive receptors. 
5.1 Mitigation of Odour
As detailed in the EMAQ+ guidance commercial kitchen ventilation systems should meet certain
minimum requirements to ensure they meet best practice design. Details of these criteria are set out
in Appendix A, including those relating specifically to odour control. Where a high level of odour
control is required the extract system should be fitted with fine filtration or ESP followed by either
carbon filtration or a UV ozone system with 0.2 – 0.4 second residence times.
A comprehensive kitchen extract system will be fitted to include a dedicated canopy fume extract
system in conjunction with a general extract system. 
The dedicated canopy extract system will include the following odour control as a minimum, which
meets the requirements of the EMAQ+ guidance for locations requiring a high level of odour control:
• stainless steel extract canopy - local fume extraction by means of a low level built-in
stainless steel extract canopy with removable and cleanable grease filters which removes
98% of airborne grease at source. The extract air volumes will be set based on tests
undertaken by McDonalds to determine the effective grease removal range of the filters.
• Electrostatic Precipitator –will be fitted to provide fine filtration for further removal of grease
particles.
• Ozone Injection – a Purified Air UV-0 1000 ozone generator unit will be fitted immediately
after the ESP with a 2-second ozone contact period.

Page 241

Odour Assessment                                                                                                                              Perth Road, Blairgowrie
A6760                                                                                                                                       August 2024
- 17 - 
• Ventilation rates –will be automatically controlled to maximise ambient fresh air free cooling
and minimise supply of air heating and cooling energy use.
• Removal of extract air will be via an external vertical discharge flue located at roof level, with
an unrestricted vertical high velocity discharge flue at of rate of 15 m/s.
• Discharge point located 1 m above roof level above kitchen in a location free from
obstructions. 
Effective maintenance is required to ensure any extract system works effectively and continues to
remove odours from the extract air. The proposed system will include access doors at intervals of at
least 1.2 m within the extract ductwork to allow for cleaning. All air filters will be changed quarterly in
conjunction with six monthly cleaning of the ducting and six-monthly servicing. The effectiveness of
the extract system will be monitored and the interval between cleaning of filters and ducting will be
reduced if considered necessary.

Page 242

Odour Assessment                                                                                                                              Perth Road, Blairgowrie
A6760                                                                                                                                       August 2024
- 18 - 
6 Conclusion
An assessment of odour from the proposed kitchen facility has been undertaken using the EMAQ+
‘Guidance on the Control of Odours and Noise from Commercial Kitchen Exhaust Systems’. 
Based on the risk assessment criteria, the proposed kitchen facility is identified as having a High
Risk of producing odour impacts at adjacent receptors. To ensure an adequate level of odour
control an extraction system will be installed within the kitchen incorporating the following features:
• stainless steel extract canopy;
• Electrostatic precipitator (ESP);
• Purified Air UV-O 1000 ozone generator unit;
• Unrestricted high velocity discharge flue with extract rate of 15m/s terminating at least 1m
above roof level;
• Access doors within ducting system at intervals of at least 1.2m. 
In addition, an effective maintenance program will be implemented including regular cleaning of grill
and fryer hoods, ducting, filters, ESP and Ozone units.
Based on the above extraction system and maintenance program it is considered that odour
emissions will be effectively controlled, and no adverse effects will be experienced at nearby
sensitive receptors.

Page 243

Odour Assessment                                                                                                                              Perth Road, Blairgowrie
A6760                                                                                                                                       August 2024
- 19 - 
Appendix A
Best practice for Design and Operation of Commercial Kitchen
Ventilation Systems
Minimum ventilation rates
• An internal ambient air temperature of 260C maximum.
• Maximum humidity levels of 65%.
• Internal noise level should comply with HSE workplace guidance.
• Dedicated make up air system to be approximately 85% of the extract flow rate.
• Minimum air change rate of 40 per hour (bases on canopy and general room
extraction).
• Extract flow rates for a commercial kitchen should be calculated using the thermal
convection method, as this overcomes heat and odour variation between different
types of cooking appliances. Other methods can be used for setting extraction
requirements from other parts of the kitchen. 
Minimum Requirements For Canopy
• Velocity requirements
- Light loading – 0.15 m/s (applies to steaming ovens, boiling pans, bains
maries and stock pot stoves).
- Medium loading – 0.225 m/s (applies to deep fat fryers, bratt pans solid and
open top ranges and griddles).
- Heavy loading – 0.3 m/s (applies to chargrills, mesquite and specialist broiler
units).
• Sizing
- Ideally, the plan dimensions of the canopy shall always exceed the plan
dimensions of the catering equipment with an overhang of 0.3m on each free
side.
- The overhand should be increased to 0.6m in front of combination steaming
ovens to cope with the steam and fumes released when the doors of the

Page 244

Odour Assessment                                                                                                                              Perth Road, Blairgowrie
A6760                                                                                                                                       August 2024
- 20 - 
appliance are opened. Solid fuel appliances must have an overhang
measured from the door open position.
• Material
- To comply with the food hygiene requirements the canopy should be made of
stainless steel.
• Grease Separation
- The grease extracted by the separators shall be collected and removed so
that it will not accumulate in either the canopy plenum or the ductwork system,
or fall back onto the cooking surface.
- The separator shall be constructed so that there are not sharp edges or
projections and shall be easily removable for regular cleaning.
- Primary filters that retain grease within the filtration matrix until cleaned, shall
not be used (not to be confused with those designed with purpose made
integral collection reservoirs). 
Minimum Requirements For Duct Work
• All ductwork should be constructed in accordance with industry best practice.
• Duct velocities should be between 2.5 and 8 m/s.
• All internal surfaces of the ductwork should be accessible for cleaning and inspection.
Access panels should be installed suitable intervals and should be leak tight.
• Duct work should comply with fire safety regulations. 
Minimum Requirements For Fans
Fans should have the capacity to operate at a margin of over 10% above the design
pressure to allow for build-up of material or to account for possible extensions to the original
kitchen plan.
Fans must be capable of handling hot, grease-laden air. The fan housing should be fitted
with plugged drain holes, which should be fitted at the lowest point in the fan housing to
remove grease and condensate.
The supply and extract fans should be located to ensure that there is sufficient space for
regular cleaning and maintenance.
There should be no air leakage at any point of the duck work and fan housing.
Fans providing extraction to canopies above solid fuel burning appliances, should be
designed to accommodate the higher operating temperature (e.g. have their motor of the
airstream, use metal impellers blades etc).

Page 245

Odour Assessment                                                                                                                              Perth Road, Blairgowrie
A6760                                                                                                                                       August 2024
- 21 - 
Minimum Requirements For Odour Control
Objectives
• for new premises or premises covered by planning conditions restricting the impact of
odour the system shall be designed to prevent harm to the amenity.
• for existing premises not covered by planning conditions restricting the impact of
odour, the system shall be designed to avoid statutory nuisance and shall comply
with the principles of Best Practical Means.
• The design of a control system should recognise that there are two phases of
contamination in a kitchen exhaust; particulate (grease, smoke, hydrocarbons/VOC)
and gaseous (odour). The particulate phase needs to be removed prior to dealing
with the gaseous phase. 
To achieve these objectives the odour control system shall include an adequate level of:
1. Particulate and odour control; and
2. stack dispersion. 
The overall performance of the odour abatement system will represent a balance of 1and 2.
Discharge stack 
The discharge stack shall:
1. Discharge the extracted air not less than 1 m above the roof ridge of any building
within 15m of the vent serving the commercial kitchen. Additional odour control,
measures may still be required depending on the cooking type and frequency.
2. If 1 cannot be complied with for planning reasons, then the extracted air shall be
discharged not less than 1 m above the roof eaves or dormer window of the building
housing the commercial kitchen. A higher level of odour control measures than those
for part 1 may be required.
3. If 1 or 2 cannot be complied with for planning reasons, then a higher level of odour
control measures than those required for part 1 or 2 may be required.

Page 246

Odour Assessment                                                                                                                              Perth Road, Blairgowrie
A6760                                                                                                                                       August 2024
- 22 - 
Odour arrestment plant performance
Low to medium level control may include:
1. Fine filtration or ESP following by carbon filtration (carbon filters rated with a 0.1
second residence time).
2. Fine filtration followed by counteractant/neutralising system to achieve the same
level of control as 1.
High level odour control may include:
1. Fine filtration or ESP followed by carbon filtration (carbon filters rated with a 0.2-0.4
second residence time).
2. Fine filtration or ESP followed by UV ozone system to achieve the same level of
control as 1.
Very high level odour control may include:
1. Fine filtration or ESP followed by carbon filtration (carbon filters rated with a 0.4 –
0.8 second residence time).
2. Fine filtration or ESP followed by carbon filtration and by counteractant/neutralising
system to achieve the same level of control as 1.
3. Fine filtration or ESP followed by UV ozone system to achieve the same level of
control as 1.
In some instances where very high levels of control are required combinations or sacrificial
levels of filtration may be employed.
Maintenance must be carried out to ensure these performance levels are always achieved. 
Maintenance
Proprietors of commercial kitchens have a duty to ensure that the ventilation system serving
the respective premises are maintained and operated effectively. Good maintenance is a
prerequisite for ensuring that a system complies with Best Practicable Means under statutory
nuisance provision and will form a key element of any scheme designed to minimise harm to
the amenity under planning regulation. Good maintenance is required by the food hygiene
regulations and will also minimise the risk of fire and minimise noise. 
The recommended cleaning period for extract ductwork is:
• Heavy Use 12-16 Hours Per Day - 3 Monthly cleaning interval
• Moderate Use 6-12 Hours Per Day - 6 Monthly cleaning interval
• Light Use 2-6 Hours Per Day – Annually cleaning interval

Page 247

Odour Assessment                                                                                                                              Perth Road, Blairgowrie
A6760                                                                                                                                       August 2024
- 23 - 
Recommendations for maintenance of odour control system include:
• System employing fine filtration and carbon filtration.
-     Change fine filters every two weeks.
-     Change carbon filters every 4 to 6 months.
• Use a system employing ESP and other in line abatement, typically
- ESP systems cleaned, and sump emptied on a four weekly basis.
- UV-C systems used in line, cleaned on a four weekly basis.
- Side Stream UV-C systems, cleaned every 3 to 6 months.
- Carbon filters with ESP pre-treatment change carbon filter every 6 to 12 months.
These time frames may increase or reduce for extreme or very light applications.

Page 248

Air Quality Assessment
New McDonalds Restaurant at
Perth Road, Blairgowrie 
28th October 2024
Rev D 27th June 2025 
Report Reference Number: A6760

Page 249

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 2 - 
Document Control
Date of first Issue Revision Date of Revision Author Checked by
28 October 2024 -  JK MB 
A 11th November 2024 JK MB 
B 20th February 2025 JK MB 
C 13th June 2025 JK MB 
D 27th June 2025 JK MB

Page 250

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 3 - 
Executive Summary
Encon Associates were commissioned by McDonalds (the ‘Client’) to carry out an air quality
assessment in connection with the proposed new McDonalds Drive-Thru and restaurant at Perth
Road, Blairgowrie (the ‘Site’). 
This report has been updated with the new Proposed Site Plan, Proposed Site Plan,
13638_AEW_2473_1004C, dated 06.06.25.
The Site falls within the district of Perth and Kinross Council (PKC) on the western edge of the town
of Blairgowrie, within the Westpark Retail Estate. Air quality within the brough is generally good and
is meeting the relevant air quality limits at locations of relevant exposure within Blairgowrie. The
Council have declared two Air Quality Management Area (AQMA) due to exceedances of the annual
mean nitrogen dioxide (NO2) objective. The AQMA covers the whole of Perth City (over 14 km to the
south-west of Blairgowrie) and the high street corridor through Crieff (0ver 20km to the south-west
of Blairgowrie). No AQMA has been declared within Blairgowrie.  
It is inevitable that with any development, demolition and construction activities will cause some
disturbance to those nearby.  Dust arising from most construction activities tends to be of a coarse
nature, which through dispersion by the wind can lead to soiling of property including windows, cars,
external paintwork and laundry.  However, as well as giving rise to annoyance due to soiling of
surfaces from dust emissions, there is evidence of major construction activities causing increases in
long term PM10 concentrations and in the number of days exceeding the short term PM10 objective of
50 µgm-3.
The IAQM guidance on assessing impacts on air quality from construction activities and determining
the likely significance has been used to determine the risk of impacts occurring during the
construction of the development and to identify appropriate mitigation measures to be implemented
on site to reduce dust emissions and associated impacts. 
Due to the proximity of nearby residential receptors the Site is considered to have a low risk of
impacts with regards to dust soiling and PM10 concentrations. However, following the
implementation of appropriate mitigation measures impacts associated with the construction of the
development are likely to be insignificant. 
The proposals will not generate a significant number of additional vehicle movements on the
adjacent road network. Impacts on local air quality associated with operational traffic will be
negligible. Furthermore, all energy provision will be provided by low emission or non-combustible
sources therefore on-site emissions will be negligible.

Page 251

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 4 - 
The assessment has also concluded that pollution levels across the borough are well within the
relevant air quality limit values therefore impacts associated with exposure will be negligible.
The assessment shows that the development proposals will meet the requirements of both national
and local planning policy and air quality does not pose a constraint to development of the Site for
the proposed uses.

Page 252

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 5 - 
Table of Contents
1 Introduction .................................................................................... 6
1.1 Overview ........................................................................................................... 6
1.2 Scope of Assessment ........................................................................................... 6
2 Site Description ................................................................................ 7
2.1 The Existing Site ................................................................................................. 7
2.2 Proposed Development ........................................................................................ 9
3 Policy Context and Guidance ............................................................... 10
3.1 National Legislation and Policy ............................................................................ 10
3.2 Planning Policy ................................................................................................. 14
3.3 Air Quality Guidance .......................................................................................... 16
4 Methodology ................................................................................... 18
4.1 Baseline Assessment ......................................................................................... 18
4.2 Construction Phase............................................................................................ 18
4.3 Operational Phase ............................................................................................. 19
5 Baseline Assessment ......................................................................... 21
5.1 Perth and Kinross Review and Assessment of Air Quality ........................................ 21
5.2 Air Quality Monitoring ........................................................................................ 21
6 Construction Assessment.................................................................... 24
6.1 Assessing the Risk of Dust Effects ....................................................................... 24
6.2 Determining Appropriate Mitigation ..................................................................... 27
7 Operational Impacts .......................................................................... 29
7.1 Traffic Emissions ............................................................................................... 29
7.2 Energy Plant Emissions ...................................................................................... 29
7.3 On-site Exposure .............................................................................................. 29
7.4 Mitigation ......................................................................................................... 29
8 Conclusion ..................................................................................... 30
Appendix A  ......................................................................................... 32
Appendix B  ......................................................................................... 34
Appendix C  ......................................................................................... 41

Page 253

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 6 - 
1 Introduction
1.1 Overview
Encon Associates were commissioned by McDonalds (the ‘Client’) to carry out an air quality
assessment in connection with the proposed new McDonalds Drive-Thru and restaurant at Perth
Road, Blairgowrie (the ‘Site’).
The Site falls within the district of Perth and Kinross Council (PKC) on the western edge of the town
of Blairgowrie, within the Westpark Retail Estate. Air quality within the borough is generally good
and is meeting the relevant air quality limits at locations of relevant exposure within Blairgowrie. The
Council have declared two Air Quality Management Area (AQMA) due to exceedances of the annual
mean nitrogen dioxide (NO2) objective. The AQMA cover the whole of Perth City (over 14 km to the
south-west of Blairgowrie) and the high street corridor through Crieff (0ver 20km to the south-west
of Blairgowrie). No AQMA has been declared within Blairgowrie.  
This report assesses air quality impacts associated with the proposed development. Potential
sources of emissions are identified and assessed in the context of existing air quality and emission
sources and the nature and location of receptors.
A glossary of common air quality terminology is provided in Appendix A.
1.2 Scope of Assessment
The application is for the construction of a new McDonalds restaurant and drive-thru on land to the
west of Perth Road, on the northern edge of Westpark retail park. The potential impacts of
operational traffic have been assessed in accordance with current air quality planning guidance
published by the Institute of Air Quality management (IAQM)1, 
The assessment has concentrated on nitrogen dioxide (NO2) and particulate matter with an
aerodynamic diameter of less than 10 µm and 2.5 µm (PM10 and PM2.,5), the pollutants most
associated with traffic emissions and which can be harmful and cause discomfort to humans.
An assessment of air quality impacts associated with the demolition and construction activities has
also been undertaken to determine measures for inclusion within a Construction Management Plan
(CMP). 
1 IAQM, Land-use Planning and Development Control: Planning for Air Quality, January 2017

Page 254

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 7 - 
2 Site Description 
2.1 The Existing Site
The Site is located on the south- western edge of Blairgowrie, within the Westpark Retail Park, west
of Perth Road. The Site lies on the northern side of the retail park opposite Starbucks Drive-thru.
The Site currently consists of an area of scrub land and is bounded by Perth Road to the east, the
wider retail park to the south, scrub land to the north and west with an area of woodland beyond and
a residential area to the east which includes the St Stephens RC Primary School and Blairgowrie
Community Campus. 
The nearest residential receptors are approximately 25 m to the east, while the school and
surrounding outside space lie approximately 70 m to the east. 
The location of the Site is shown, bounded in red, in Figure 2.1.

Page 255

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 8 - 
Figure 2.1: Location of proposed development site

Page 256

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 9 - 
2.2 Proposed Development
An application is being submitted for the construction of a purpose-built, Drive-thru restaurant with
Drive-thru lane and car park area. 
Access to the Site will be via the existing access road into the northern part of the retail park to the
north of the existing Starbucks Drive-thru. A Drive-thru Lane will be provided running round the
boundary of the Site in a clockwise direction and a central car park area. The restaurant building will
be located on the eastern side of the Site immediately adjacent to Perth Road.  
The restaurant will include a front of house seating area and commercial kitchen. 
An indicative layout of the Site is shown in Figure 2.2.
A high velocity exhaust flue connected to the ventilation and extraction system will terminate 1 m
above the roof level, with the kitchen extract system being located above the kitchen area within the
roof space or at roof level.
Figure 2.2: Layout of Site

Page 257

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 10 - 
3 Policy Context and Guidance
3.1 National Legislation and Policy
3.1.1 The Air Quality Regulations
The Air Quality (Scotland) Regulations 20002, Air Quality (Scotland) Amendment Regulations 20023
and Air Quality (Scotland) Amendment Regulations 20164  set out a series of air quality objectives
for the protection of human health and critical levels for the protection of vegetation.  Objectives
apply both nationally, where they are the responsibility of national government and locally, where
achieving them is the responsibility of the relevant local authority. 
The air quality objectives are long-term benchmarks for ambient pollutant concentrations which
represent negligible or zero risk to health, based on medical and scientific evidence reviewed by the
Expert Panel on Air Quality Standards (EPAQS) and the World Health Organisation (WHO).  These
are general concentration limits, above which sensitive members of the public (e.g. children, the
elderly and the unwell) might experience adverse health effects. 
For some pollutants, there is both a long-term (annual mean) limit and a short-term limit.  In the
case of NO2, the short-term standard is for a 1-hour averaging period, whereas for PM10 it is for a
24-hour averaging period.  These periods reflect the varying impacts on health of differing
exposures to pollutants (e.g. temporary exposure on the pavement adjacent to a busy road,
compared with the exposure of residential properties adjacent to a road).
Of the pollutants included in the regulations, NO2, PM10 and PM2.5 are of particular relevance to this
assessment as these are the primary pollutants associated with road traffic. The current limit values
for these three pollutants in relation to human health are set out in Table 3.1. 
2 The Air Quality (Scotland) Regulations 2000- Scottish Statutory Instrument 2000 No.97
3 The Air Quality (Scotland) Amendment Regulations 2002 – Scottish Statutory Instrument No. 297
4 The Air Quality (Scotland) Amendment Regulations 2016 – Scottish Statutory instrument No. 162

Page 258

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 11 - 
Table 3.1: Relevant Limit Values set out in the Air Quality Regulations
Pollutant Concentrations Measured As Date to be
Achieved by
Nitrogen
Dioxide (NO2)
200 µg/m3 not to be exceeded more than 18
times per year
1-hour mean 31 December
2005
40 µg/m3 Annual mean 31 December
2005
Particulate
Matter (PM10)
50 µg/m3 not to be exceeded more than 7 times
per year
24-hour mean 31 December
2010
18 µg/m3 Annual mean 31 December
2010
Particulate
Matter (PM2.5)
10 µg/m3 Annual Mean 31 December
2020 
The NAQOs apply to external air where there is relevant exposure to the public over the associated
averaging periods within each objective.  Guidance is provided within Local Air Quality Management
Technical Guidance 2022 (LAQM.TG(22))5  issued by the Defra for Local Authorities, on where the
NAQOs apply as detailed in Table 3.2.  The objectives do not apply in workplace locations, to
internal air or where people are unlikely to be regularly exposed (i.e. centre of roadways).
It should be noted that the EU Limit Values are numerically the same as the NAQO values but differ
in terms of compliance dates, locations where they apply and legal responsibility. The compliance
date for the NO2 Limit Values is 1 January 2010, which is five years later than the date for the
NAQO.
The Limit Values are mandatory, whereas the NAQOs are policy objectives. Local authorities are
not required to achieve them but have to work towards their achievement. In addition, the limit
Values apply in all locations except where members of the public do not have access and there is
no fixed habitation, on factory premises or at industrial installations, and on the carriageway/central
reservation of roads except where there is normally pedestrian access. 
5 Defra (2022) Local Air Quality Management. Technical Guidance LAQM.TG(22)

Page 259

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 12 - 
Table 3.2: Locations Where Air Quality Objectives Apply
Averaging Period Objectives should apply at: Objectives should generally
not apply at:
Annual mean All locations where members of
the public might be regularly
exposed. Building Facades of
residential properties, schools,
hospitals, care home etc. 
Building facades of offices or other
places of work where members of
the public do not have regular
access.
Hotels, unless people live there as
their permanent residence.
Gardens of residential properties.
Kerbside sites (as opposed to
locations at the building facade), or
any other location where public
exposure is expected to be short
term.
24-hour mean All locations where the annual
mean objective would apply
together with hotels.
Gardens of residential properties.
Kerbside sites (as opposed to
locations at the building façade), or
any other location where public
exposure is expected to be short
term.
1-hour mean All locations where the annual
mean and 24 hour mean
objectives apply.
Kerbside Sites (e.g. pavements of
busy shopping streets).
Those parts of car parks, bus
stations and railway stations etc.
which are not fully enclosed,
where the public might reasonably
be expected to spend 1-hour or
more. Any outdoor locations where
the public might reasonably be
expected to spend 1-hour or
longer. 
Kerbside sites where the public
would not be expected to have
regular access.

Page 260

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 13 - 
3.1.2 Local Air Quality Management
Local authorities are seen to play a particularly important role. Section 82 of the Environment Act
1995 requires every local authority to conduct a review of the air quality from time to time within the
authority’s area. LAQM.TG(22) and Scotland’s LAQM Policy Guidance ((PG(S)(24))6 describes a
streamlined approach to the Local Air Quality Management (LAQM) regime, whereby every
authority has to undertake and submit a single Annual Status Report/Annual Progress Report within
its area, to identify whether the objectives have been or will be achieved at relevant locations by the
applicable date. If the objectives are not being met, the authority must declare an Air Quality
Management Area (section 83 of the Act) and prepare an action plan (section 84) which identifies
measures that will be introduced in pursuit of the objectives.
3.1.3 Cleaner Air For Scotland 2 – Towards a Better Place for Everyone
The Strategy7 sets out how the Scottish Government will continue to deliver air quality
improvements across the country based on the recommendations arising from the Cleaner Air for
Scotland (CAFS) review8. The Strategy sets out actions the Government will take to reduce
emissions and improve air quality, working with local authorities and other organisations to
implement measures and actions that benefit air quality, inform future plans and policy making and
undertake further research and monitoring of emissions.
3.1.4 Control of Dust and Particulates Associated with Construction
Section 79 of the Environmental Protection Act (1990)9 states that where a statutory nuisance is
shown to exist, the local authority must serve an abatement notice. Statutory nuisance is defined as:
• 'any dust or other effluvia arising on industrial, trade or business premises and being
prejudicial to health or a nuisance', and
• 'any accumulation or deposit which is prejudicial to health or a nuisance'. 
Failure to comply with an abatement notice is an offence and if necessary, the local authority may
abate the nuisance and recover expenses.
In the context of the proposed development, the main potential for nuisance of this nature would
arise during the construction phase - potential sources being the clearance, earthworks,
construction and landscaping processes. 
6 Scottish Government (2024) Local Air Quality management Policy Guidance PG(S) (24), May 2024
7 Scottish Government (2021) Cleaner Air for Scotland – Towards a Better Place for Everyone, July 2021
8 Cleaner Air for Scotland Strategy: Independent Review – www.gov.scot
9 Secretary of State, The Environment Act 1990 HMSO

Page 261

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 14 - 
There are no statutory limit values for dust deposition above which 'nuisance' is deemed to exist -
'nuisance' is a subjective concept and its perception is highly dependent upon the existing
conditions and the change which has occurred. However, research has been undertaken by a
number of parties to determine community responses to such impacts and correlate these to dust
deposition rates. However, impacts remain subjective and statutory limits have yet to be derived.
3.2 Planning Policy 
3.2.1 National Planning Policy
The most recent Scottish planning policy, National Planning Framework 4 (NPF4) was published in
February 2023. The Plan sets out six overarching spatial principles aimed at delivering on the
United Nations (UN) Sustainable Development Goals (SDgs) and the Scottish national outcomes.
By applying the spatial principles, the Strategy aims to support the planning and delivery of:
• Sustainable places – where emissions are reduced, and biodiversity is restored and better
connected
• Liveable places – where there is better and healthier living
• Productive places – where the economy is greener, fairer and more inclusive. 
Page 76 of the Framework sets out Policy 23 which aims to ‘protect people and places from
environmental harm, mitigate risks arising from safety hazards and encourage, promote and
facilitate development that improves health and wellbeing’. 
With specific reference to air quality the Policy sets out the following:
‘…d) Development proposals that are likely to have significant adverse effects on air quality will not
be supported. Development proposals will consider opportunities to improve air quality and reduce
exposure to poor air quality. An air quality assessment may be required where the nature of the
proposal or the air quality in the location suggest significant effects are likely’.

Page 262

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 15 - 
3.2.2 Perth and Kinross Local Development Plan 2
The Perth and Kinross Local Development Plan 210 sets out the framework for which planning
applications will be assessed.
In dealing with air quality the Plan sets out the following under Policy 57:
‘The Council has a responsibility to improve air quality. The LDP does this by seeking to prevent the
creation of new pollution hotspots, and to prevent introduction of new human exposure where there
could be existing poor air quality. 
The LDP extends support to low emission technologies for both transport and energy production.
AS well as aspiring to improve air quality, the policy also aspires to eliminate the gradual worsening
in air quality that is caused by the cumulative impact of many small developments.
Within or adjacent to designated AQMA, where pollution concentrations are in excess of the national
air quality objectives and may pose a risk to human health, development proposal that would
adversely affect air quality may not be permitted. There is a presumption against locating
development catering for sensitive receptors in areas where they may be expose to elevated
pollution levels. 
Any proposed development that could have a detrimental effect on air quality, through exacerbation
of exiting air quality issues or introduction of new sources of pollution (including dust and/or odour),
must provide appropriate mitigation measures. The LDP expects that some type of mitigation of air
quality impacts will be required for all but the smallest developments. Best practice design
measures should therefore be considered early in the design and placemaking process.
Proposals and mitigation measures must not conflict with the actions proposed in Air Quality Action
Plans. 
An air quality assessment will usually be requiried where the Council considers that there may be a
risk of an air quality impact upon human health. The main ways in which a development may
potentially impact upon air quality are as follows:
a) Introducing new human exposure at a location with poor air quality (e.g. within an existing
AQMA or close to a busy road or junction);
b) The development may itself lead to a deterioration in local air quality (e.g. from increased
vehicle emissions or flue emissions from heating or energy production plant); and
c) If the demolition/construction phase will have an impact upon the local environment (e.g.
through fugitive dust and/or exhaust emissions from machinery and vehicles). 
10 Perth and Kinross Council (2019) Local Development Plan 2, November 2019

Page 263

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 16 - 
The cumulative impact of other consented development and of these three criteria will be taken into
account. In line with best practice, screening criteria will be used to identify where impacts are
significant. Supplementary guidance will set out how air quality will be considered when determining
planning applications.
The Council keeps an evidence base of air quality and has developed a high-resolution dispersion
model for the LDP area.’
3.2.3 Perth and Kinross Air Quality and Planning Supplementary Document
The Perth and Kinross Air Quality SPD11 sets out an approach to assessing air quality in relation to
development proposals to provide a consistent approach to the process and provide guidance on
how air quality will be considered by the Council when determining an application. Guidance set out
within the SPD has been used to determine the scope of this assessment.
3.3 Air Quality Guidance 
3.3.1 DEFRA Technical Guidance
LAQM.TG(22) sets out detailed guidance on how air quality should be assessed and monitored by
local authorities. The document provides useful guidance on how air quality from specific sources
should be screened and the approaches that should be used to undertake detailed assessment
where potentially significant emissions are identified, including details on model verification and
consideration of monitoring data for use in assessments. 
3.3.2 IAQM Land Use Planning and Development Control: Planning for Air Quality
Institute of Air Quality Management (IAQM) and Environmental Protection UK (EPUK) have
published joint guidance on the assessment of air quality impacts for planning purpose. This
includes information on when an air quality assessment is required, what should be included in an
assessment and criteria for assessing the significance of any impacts. The scope of the operational
impact and exposure assessment within this report are based on the guidance set out in this
document.
3.3.3 IAQM Guidance on the Assessment of Dust from Demolition and Construction
Guidance produced by the IAQM on assessing impacts from construction and demolition activities12
includes a methodology for identifying the risk magnitude of potential dust sources associated with 
11 Perth and Kinross Council (2020) Air Quality and Planning, March 2020
12 IAQM (2024) Guidance on the Assessment of Dust from Demolition and Construction, Version 2.2, January 2024

Page 264

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 17 - 
demolition, construction, earthworks and trackout. This is then used to identify the level of mitigation
necessary in order for the impacts to be not significant.

Page 265

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 18 - 
4 Methodology 
4.1 Baseline Assessment
A baseline assessment of air quality in the vicinity of the Site and the surrounding area has been
carried out through a review of monitoring data available within the NYC air quality review and
assessment reports, most notably the PKC 2023 Air Quality Annual Progress Report (APR)13
Additional data has been obtained from the UK Air Information Resource (UK-AIR) background
pollution maps14. 
The baseline assessment has also been informed by the results of the detailed modelling
assessment, the details of which are set out in Section 4.3.
4.2 Construction Phase
4.2.1 Construction Traffic
During construction of the proposed development, lorries will require access to the Site to deliver
and remove materials; earthmoving plant and other mobile machinery will work on site and
generators and cranes will also be in operation.  These machines produce exhaust emissions; of
particular concern are emissions of NO2 and PM10.  
It is anticipated that during the construction phase there would be no more than 5-10 heavy duty
vehicles (HDV) accessing the Site in any given day. 
The EPUK & IAQM air quality planning guidance sets out criteria to determine when significant
effects are likely to occur, and a more detailed assessment of traffic emissions is required. The
criteria indicate that significant impacts on air quality are unlikely to occur where a development
results in less than 25 HDV movements per day in locations within or adjacent to an AQMA and less
than 100 HDV outside of an AQMA. It is therefore anticipated that as the Site does not fall within an
AQMA, construction traffic generated by the proposed development would result in a negligible
impact on local NO2 and PM concentrations and has not been considered any further in this
assessment. 
13 PKC (2023) 2023 Air Quality Annual Progress Report for Perth & Kinross Council, July 2023
14 https://uk-air.defra.gov.uk/data/laqm-background-home

Page 266

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 19 - 
4.2.2 Construction/Fugitive Dust
Construction phase activities associated with the Proposed Development may result in the
generation of fugitive dust emissions (i.e. dust emissions generated by site-specific activities that
disperse beyond the construction site boundaries).
If transported beyond the site boundary, dust can have an adverse impact on local air quality. The
IAQM guidance considers the potential for dust nuisance and impacts to human health and
ecosystems to occur due to activities carried out during the following stages of construction:
• Demolition (removal of existing structures).
• Earthworks (soil-stripping, ground-levelling, excavation and landscaping).
• Construction (activities involved in the provision of a new structure); and
• Trackout (the transport of dust and dirt from the construction site onto the public road
network where it may be deposited and then re-suspended by vehicles using the network). 
A qualitative assessment of air quality impacts due to the release of fugitive dust and particulates
(PM10) during the construction phase was undertaken in accordance with the methodology detailed
in the IAQM guidance. 
The assessment takes into account the nature and scale of the activities undertaken for each
source and the sensitivity of the area to an increase in dust and PM10 levels, thus enabling a level of
risk to be assigned.  Risks are described in terms of there being a low, medium or high risk of dust
impacts.   
Once the level of risk has been ascertained, then site specific mitigation proportionate to the level of
risk is identified, and the significance of residual effects determined.  
A summary of the IAQM assessment methodology is provided in Appendix B.
4.3 Operational Phase 
4.3.1 Traffic Emissions 
The screening criteria set out in the EPUK & IAQM has been used to determine whether the trip
generation from the operational development is likely to result in a significant impact on local air
quality. The guidance states that where the following criteria are exceeded a more detailed
assessment is required:

Page 267

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 20 - 
• An increase in LGV or more than 100 vehicles per day within or adjacent of an AQMA, an
increase of more than 500 per day elsewhere;
• An increase in HGV or more than 25 vehicles per day or adjacent to an AQMA, an increase
of more than 100 per day.
Anticipated trip generation from the operational development has assessed against the above
criteria. Where this criterion is exceeded then a detailed assessment of operational impacts may be
required.

Page 268

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 21 - 
5 Baseline Assessment 
5.1 Perth and Kinross Review and Assessment of Air Quality
PKC has carried out detailed assessments of air quality in the borough and as a result has declared
two AQMA within the district due to exceedances of the annual mean NO2 objective at locations of
relevant exposure. However, both AQMA are over 14km from the Site.
The Site does not fall within an AQMA and air quality within Blairgowrie has been found to be
meeting the relevant air quality objective limits at locations of relevant exposure. Furthermore,
monitoring across the district has shown that for the fourth year running, the air quality objective
limits have not been exceeded at any location within the district, including within the AQMA.
5.2 Air Quality Monitoring 
5.2.1 NO2 Concentrations
PKC monitors NO2 concentrations extensively across the borough using both automatic and non-
automatic (diffusion tubes) monitoring sites at a mix of background, roadside and kerbside sites. 
Only one of these is located in Blairgowrie, located at the junction of Balmoral Road (A93) and Boat
Brae (A926) (Monitoring Site P108), approximately 1.6 km to the north-east of the Site.
Annual mean NO2 concentrations recorded at all monitoring sites within the district have been below
the limit value of 40 µg/m3 since 2019, based on data set out within the PKC 2023 APR.
Concentrations recorded at Site P108 on Balmoral Road have been at less than 70% of the
objective (well below) since 2018. Furthermore, data from across the district shows a consistent
downward trend in concentrations since 2018. During 2022 an annual mean concentration of 17.3
µg/m3 was recorded at monitoring site P108 in Blairgowrie.
Diffusion tubes cannot monitor short-term NO2 concentrations, however, research15 has concluded
that exceedences of the 1-hour mean objective are generally unlikely to occur where annual mean
concentrations do not exceed 60 µg/m3.  Based on monitoring data presented in the 2023 APR,
which shows at all locations annual mean concentrations are less than 30 µg/m3, it is unlikely that
the short-term objective is being exceeded at any of the monitoring sites. 
15 D Laxen and B Marner: Analysis of the relationship between 1-hour and annual mean nitrogen dioxide at UK roadside and kerbside
monitoring sites (July 2003).

Page 269

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 22 - 
5.2.2 PM Concentrations
PM10 concentrations are measured at four location within the district, three within Perth and one in
Crieff. 
Annual mean concentrations recorded at all three sites have been less than 18 µg/m3 since 2018
although there has been little change in concentrations over the five year period.
All three sites have recorded exceedances of the 24-hour limit value since 2018, however, only at
one site, located on Atholl Street in Perth, has the number of exceedances exceeded 7, indicating a
an exceedance of the 24-hour objective which allows for up to 7 exceedances in any given year.
PM2.5 concentrations are also measured at the three automatic sites. Data recorded since 2018
indicates that PM2.5 concentrations have been below the objective of 10 µg/m3 over the monitoring
period, again with little change in concentrations over the 5 year period.
5.2.3 Defra Background Maps 
Additional information on estimated background pollutant concentrations has been obtained from
the Scottish Government Air Quality website (https://www.scottishairquality.scot/data/mapping/data)
background mapping data. Estimated air pollution concentrations for oxides of nitrogen (NOx), NO2
and PM10 have been extracted from the 2018 based background pollution maps for Scotland. These
maps are available in 1 km x 1 km grid squares and provide an estimate of concentrations between
2018 and 2030. The average concentrations for the grid square representing the Site (OS317500,
743500) have been extracted for the 2024 base year. The data is provided in Table 4.1. 
No data is currently available within the Scottish maps for PM2.5. Background data for this pollutant
has therefore been obtained from the Defra background maps provided on the UK-AIR, the Air
Quality Information Resource (http://uk-air.defra.gov.uk/).  2024 data is provided in Table 4.1.

Page 270

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 23 - 
Table 4.1: Annual Mean Background Air Pollution Concentrations in 2023
Location (OS Grid Square) Annual mean concentrations (µgm-3)
Nitrogen
dioxide PM10 PM2.5
317500, 743500 2.7 8.2 4.6 
The data indicates that existing background concentrations are currently meeting the NO2, PM10 and
PM2.5 objectives in the vicinity of the Site.

Page 271

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 24 - 
6 Construction Assessment 
6.1 Assessing the Risk of Dust Effects 
6.1.1 Site and Surroundings 
A summary of the proposed development is provided in Section 2 of this report. 
There are residential properties located to the east of the Site within 50 m.  An assessment of
construction related impacts in relation to human receptors is therefore considered necessary.
Significant impacts on ecologically sensitive receptors are unlikely to occur beyond 50 m from any
construction activities. A review of data held on the Defra MAGIC website16 shows no sites
designated as important for wildlife within 50 m of the Site therefore impacts on ecological receptors
has not been considered any further within this assessment.
A review of background data published by the Scottish Government and Defra within the 2024
background maps, indicates background concentrations of PM10 at the Site in the region of 8-9
µg/m3, at 50% of the annual mean objective.  It is therefore expected, based on professional
judgement, that concentrations at roadside locations are unlikely to be higher than 14 µg/m3, making
the surrounding area low in sensitivity to human health impacts.  
The precise behaviour of the dust, its residence time in the atmosphere, and the distance it may
travel before being deposited would depend upon a number of factors.  These include wind direction
and strength, local topography and the presence of intervening structures (buildings, etc.) that may
intercept dust before it reaches sensitive locations. Furthermore, dust would be naturally
suppressed by rainfall.
A windrose from the Dundee Meteorological Station for 2022 is provided below in Figure 6.1, which
shows that the prevailing wind is from the west-southwest. Receptors located to the east-northeast
of the Site are therefore most at risk of experiencing impacts. There are residential properties
located to the east-northeast, with the school/education campus beyond, all of which will be of high 
sensitivity to dust effects.  
Figure 6.1: Windrose from Dundee Meteorological Site (2022) 
16 http://magic.defra.gov.uk/

Page 272

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 25 - 
0
0
3
1.5
6
3.1
10
5.1
16
8.2
(knots)
(m/s)
Wind speed
0° 10°
20°
30°
40°
50°
60°
70°
80°
90°
100°
110°
120°
130°
140°
150°
160°
170°180°190°
200°
210°
220°
230°
240°
250°
260°
270°
280°
290°
300°
310°
320°
330°
340°
350°
300
600
900
1200
6.1.2 Risk Assessment of Dust Impacts 
Defining the Dust Emission Magnitude
With reference to the criteria detailed in Appendix B, the dust emission magnitude for each of the
categories demolition, earthworks, construction and trackout have been determined. These have
been summarised in Table 6.1.
Table 6.1: Dust Emission Magnitude for each Activity
Activity Criteria Magnitude
Demolition No demolition required n/a
Earthworks Site area approx. 2,909 m², 1-2 HDV on site, storage bunds no more
than <3m in height
Small
Construction Total build volume <1,500 m3 although brick and concrete will be
main building materials
Small 
Trackout <20 HDV per day  Small

Page 273

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 26 - 
6.1.3 Sensitivity of Surrounding Area
Using the criteria set out in Tables B1 to B3, Appendix B, the sensitivity of the surrounding area to
impacts from dust emissions has been determined and are set out in Table 6.2.
Dust Soiling
The nearest residential properties are approximately 25-30m to the east of the Site, although the
garden areas lie within 20 m of the Site. There are only three residential gardens within 20m of the
Site and 6 properties within 50 m of the Site. The sensitivity of the surrounding area in relation to
dust soiling effects is therefore considered to be medium. 
It is expected that there will be no more than 5-10 HDV (>3.5t) movements per day during the
construction phase which are expected to travel to and from the Site along Perth Road.  As a
general guide, significant impacts from trackout may occur up to 500 m from large sites, 250 m from
medium sites and 50 m from small sites, as measured from the site exit. There are >10 residential
properties within 20 m of the roadside within 250 m of the Site along Perth Road. Furthermore, the
car parking areas of the retail park would be of medium sensitivity to dust effects and lie within 20 m
of the roadside.  The sensitivity of the area to dust soiling effects from trackout is therefore
considered to be high.
PM10 Effects
As previously discussed, annual mean PM10 concentrations in the vicinity of the Site are expected to
be below 24 µg/m3. Based on the proximity of sensitive receptors to the site boundary and the local
concentrations of PM10 the sensitivity of the surrounding area is considered to be low with regards
human health impacts.

Page 274

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 27 - 
Table 6.2: Sensitivity of Surrounding Area
Source Dust Soiling Human health
Demolition n/a n/a
Earthworks Medium Low
Construction Medium Low
Trackout High Low
6.1.4 Defining the Risk of Impacts
The dust emission magnitude as set out in Table 6.1 is combined with the sensitivity of the area
(Table 6.2) to determine the risk of both dust soiling and human health impacts, assuming no
mitigation measures applied at site. The risk of impacts associated with each activity is provided in
Table 6.3 below and has been used to identify site-specific mitigation measures, which are
discussed in Section 6.2 and set out in Appendix C.
Table 6.3: Summary of Risk Effects to Define Site Specific Mitigation
Source Dust Soiling Human health
Demolition n/a n/a
Earthworks Low Risk Negligible Risk
Construction Low Risk Negligible Risk
Trackout Low Risk Negligible Risk
6.2 Determining Appropriate Mitigation
The control of dust emissions from construction site activities relies upon management provisions
and mitigation techniques to reduce emissions of dust and limit dispersion.  Where dust emission
controls have been used effectively, large-scale operations have been successfully undertaken
without impacts to nearby properties.  
An overall medium risk of impacts is predicted at adjacent receptors during construction of the
proposed development. Appropriate mitigation measures for the Site have been identified following
the IAQM guidance and based on the risk effects presented in Table 6.3. It is recommended that the

Page 275

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 28 - 
measures set out in Appendix C are incorporated into a DMP and approved by PKC prior to
commencement of any work on site. 
Based on the risk effects identified during each of the four types of activities and following
implementation of the recommended mitigation measures, the significance of residual impacts
during construction of the proposed development will be negligible.

Page 276

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 29 - 
7 Operational Impacts 
7.1 Traffic Emissions
The proposals will create a new drive-thru restaurant on the Site. Traffic data provided by the
transport consultants, Andrew Moseley Associates (AMA) indicates that the majority of trips
associated with the new restaurant will be already existing pass-by trips and therefore are already
on the network, making us of the wider retail park or using the A93 and a through road on their
existing journey. 
In terms of new trips on the network, the restaurant is estimated to create an additional 225 vehicle
movements to the north of the Site on the A93 and 116 movements travelling to the south on the
A93. This is significantly below the IAQM screening criteria set out in section 4.3.1 for locations
outside of an AQMA.
Impacts on local air quality as a result of the operational development are concluded as being
negligible.
7.2 Energy Plant Emissions
All energy for the new building will be through a combination of photovoltaic cells located at roof
level and either non-combustible sources such as Air Source Heat Pumps (ASHP) or low NOx
boilers. Emissions associated with on-site energy sources will therefore be negligible.
7.3 On-site Exposure
The proposed development would not provide any sensitive receptors (i.e. residential, educational
or health receptors). Due to the transient nature of users of the Site the annual mean and 24-hour
objective limits do not apply. However, the short-term objective limits such as the 1-hour NO2
objective are considered relevant to the Site. Exposure at the Site should therefore be considered in
relation to the 1-hour NO2 objective but not in relation to the PM objective limits.
The baseline review set out in Section 5 concludes that concentrations of all pollutants are well
within the relevant air quality limit values across the district therefore the development would not
introduce new employment use into a location of poor air quality, the impact of the proposals in
terms of new exposure is therefore negligible.
7.4 Mitigation
The development would have a negligible impact on local air quality, no mitigation is therefore
required.
.

Page 277

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 30 - 
8 Conclusion
Encon Associates were commissioned by McDonalds (the ‘Client’) to carry out an air quality
assessment in connection with the proposed new McDonalds Drive-Thru and restaurant at Perth
Road, Blairgowrie.
The development once operational, would have a negligible impact on local air quality, no mitigation
is therefore required.
However,
i
t is inevitable that with any development, demolition and construction activities will cause some
disturbance to those nearby.  Dust arising from most construction activities tends to be of a coarse
nature, which through dispersion by the wind can lead to soiling of property including windows, cars,
external paintwork and laundry.  However, as well as giving rise to annoyance due to soiling of
surfaces from dust emissions, there is evidence of major construction activities causing increases in
long term PM10 concentrations and in the number of days exceeding the short term PM10 objective of
50 µgm-3.

Page 278

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 31 - 
The IAQM guidance on assessing impacts on air quality from construction activities and determining
the likely significance has been used to determine the risk of impacts occurring during the
construction of the development and to identify appropriate mitigation measures to be implemented
on site to reduce dust emissions and associated impacts. 
Due to the proximity of nearby residential receptors the Site is considered to have a low risk of
impacts with regards to dust soiling and PM10 concentrations. However, following the
implementation of appropriate mitigation measures impacts associated with the construction of the
development are likely to be insignificant. 
The proposals will not generate a significant number of additional vehicle movements on the
adjacent road network. Impacts on local air quality associated with operational traffic will be
negligible. Furthermore, all energy provision will be provided by low emission or non-combustible
sources therefore on-site emissions will be negligible.
The assessment has concluded that pollution levels across the borough are well within the relevant
air quality limit values therefore impacts associated with exposure within the Site will be negligible.
The assessment shows that the development proposals will meet the requirements of both national
and local planning policy and air quality does not pose a constraint to development of the Site for
the proposed uses.

Page 279

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 32 - 
Appendix A
Glossary of Terminology 
Term Definition
Accuracy A measure of how well a set of data fits the true value.
Air quality
objective
Policy target generally expressed as a maximum ambient
concentration to be achieved, either without exception or with a
permitted number of exceedences within a specific timescale (see
also air quality standard).
Air quality
standard
The concentrations of pollutants in the atmosphere which can
broadly be taken to achieve a certain level of environmental quality.
The standards are based on the assessment of the effects of each
pollutant on human health including the effects on sensitive sub
groups (see also air quality objective).
Ambient air Outdoor air in the troposphere, excluding workplace air.
Annual mean
The average (mean) of the concentrations measured for each
pollutant for one year. Usually this is for a calendar year, but some
species are reported for the period April to March, known as a
pollution year. This period avoids splitting winter season between 2
years, which is useful for pollutants that have higher concentrations
during the winter months.
AQMA Air Quality Management Area.
DEFRA Department for Environment, Food and Rural Affairs.
Exceedance A period of time where the concentrations of a pollutant is greater
than, or equal to, the appropriate air quality standard.
Fugitive
emissions
Emissions arising from the passage of vehicles that do not arise from
the exhaust system.
LAQM Local Air Quality Management.
NO Nitrogen monoxide, a.k.a. nitric oxide.
NO2 Nitrogen dioxide.
NOx Nitrogen oxides.
O3 Ozone.
Percentile The percentage of results below a given value.
PM10
Particulate matter with an aerodynamic diameter of less than 10
micrometres.
Ratification
(Monitoring)
Involves a critical review of all information relating to a data set, in
order to amend or reject the data. When the data have been ratified
they represent the final data to be used (see also validation).
µgm-3 micrograms
per
cubic metre
A measure of concentration in terms of mass per unit volume. A
concentration of 1ug/m3 means that one cubic metre of air contains
one microgram (millionth of a gram) of pollutant.
UKAS United Kingdom Accreditation Service.
Uncertainty
A measure, associated with the result of a measurement, which
characterizes the range of values within which the true value is
expected to lie. Uncertainty is usually expressed as the range within
which the true value is expected to lie with a 95% probability, where
standard statistical and other procedures have been used to
evaluate this figure. Uncertainty is more clearly defined than the

Page 280

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 33 - 
closely related parameter 'accuracy', and has replaced it on recent
European legislation.
USA Updating and Screening Assessment.
Validation
(modelling)
Refers to the general comparison of modelled results against
monitoring data carried out by model developers.
Validation
(monitoring)
Screening monitoring data by visual examination to check for
spurious and unusual measurements (see also ratification).
Verification
(modelling)
Comparison of modelled results versus any local monitoring data at
relevant locations.

Page 281

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 34 - 
Appendix B
IAQM Construction Impact Assessment Procedure
In order to assess the potential impacts, the activities on construction sites are divided into four
categories. These are:
• demolition (removal of existing structures).
• earthworks (soil-stripping, ground-levelling, excavation and landscaping).
• construction (activities involved in the provision of a new structure); and
• trackout (the transport of dust and dirt from the construction site onto the public road network
where it may be deposited and then re-suspended by vehicles using the network). 
For each activity, the risk of dust annoyance, health and ecological impact is determined using three
risk categories: low, medium and high risk. The risk category may be different for each of the four
activities. The risk magnitude identified for each of the construction activities is then compared to
the number of sensitive receptors in the near vicinity of the site in order to determine the risks posed
by the construction activities to these receptors. 
Step 1: Screen the Need for an Assessment
The first step is to screen the requirement for a more detailed assessment. An assessment is
required where there is:
• a ‘human receptor’ within 350m of the boundary of the site or 50m of the route(s) used by
construction vehicles on the public highway, up to 500m from the site entrance(s); and/or 
• an ‘ecological receptor’ within 50m of the boundary of the site; or 50m of the route(s) used 
by the construction vehicles on the public highway, up to 500m from the site entrance(s). 
Step 2A: Define the Potential Dust Emission Magnitude
This is based on the scale of the anticipated works and the proximity of nearby receptors. The risk is
classified as small, medium or large for each of the four categories.
Demolition: The potential dust emission classes for demolition are:
• Large: Total building volume >50,000m3, potentially dusty construction material (e.g.
Concrete), on site crushing and screening, demolition activities >20m above ground level.
• Medium: total building volume 20,000m3 – 50,000m3, potentially dusty construction material,
demolition activities 10-20 m above ground level; and

Page 282

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 35 - 
• Small: total building volume <20,000m3, construction material with low potential for dust
release (e.g. metal cladding or timber), demolition activities <10m above ground, demolition
during wetter months. 
Earthworks: This involves excavating material, haulage, tipping and stockpiling. The potential dust
emission classes for earthworks are:
• Large: Total site area >10,000m2, potentially dusty soil type (e.g. clay, which will be prone to
suspension when dry due to small particle size), >10 heavy earth moving vehicles active at
any one time, formation of bunds >8 m in height, total material moved >100,000 tonnes;
• Medium: Total site area 2,500 m2 – 10,000m2, moderately dusty soil (e.g. silt), 5 – 10 heavy
earth moving vehicles active at any one time, formation of bunds 4m – 8m in height, total
material moved 20,000 tonnes- 100,000 tonnes; and
• Small: Total site area <2,500m2, soil type with large grain size (e.g. sand), <5 heavy earth
moving vehicles active at any one time, formation of bunds <4 m in height, total material
moved <20,000 tonnes, earthworks during wetter months. 
Construction: The important issues here when determining the potential dust emission magnitude
include the size of the building(s)/infrastructure, method of construction, construction materials, and
duration of build. The categories are:
• Large: Total building volume >100,000m3, on site concrete batching, sandblasting.
• Medium: Total building volume 25,000m3 – 100,000m3, potentially dusty construction
material (e.g. concrete), on site concrete batching; and
• Small: Total building volume <25,000m3, construction material with low potential for dust
release (e.g. metal cladding or timber). 
Trackout: The risk of impacts occurring during trackout is predominantly dependent on the number
of vehicles accessing the Site on a daily basis. However, vehicle size and speed, the duration of
activities and local geology are also factors which are used to determine the emission class of the
Site as a result of trackout. The categories are:
• Large: >50 HDV (>3.5t) outward movements in any one day, potentially dusty surface
material (e.g. high clay content), unpaved road length > 100m.
• Medium: 10-50 HDV (>3.5t) outward movements in any one day, moderately dusty surface
material (e.g. high clay content, unpaved road length 50-100m; and

Page 283

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 36 - 
• Small: <10 HDV (>3.5t) outward movements in any one day, surface material with low
potential for dust release, unpaved road length >50m.
Step 2B: Defining the Sensitivity of the Area 
The sensitivity of the area is defined for dust soiling, human health (PM10) and ecological receptors.
The sensitivity of the area takes into account the following factors:
• the specific sensitivities of receptors in the area.
• the proximity and number of receptors.
• in the case of PM10, the local background concentration; and
• site specific factors, such as whether there are natural shelters, such as trees, to reduce the
risk of wind-blown dust. 
Table B1 is used to define the sensitivity of different types of receptors to dust soiling, health effects
and ecological effects.
Based on the sensitivities assigned to the different receptors surrounding the site and numbers of
receptors within certain distances of the site, a sensitivity classification can be defined for each.
Tables B2 to B4 indicate the criteria used to determine the sensitivity of the area to dust soiling,
human health and ecological impacts.

Page 284

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 37 - 
Table B1: Examples of Factors Defining Sensitivity of an Area 
Sensitivity
of Area
Dust Soiling Human Receptors Ecological Receptors
High Users can reasonably expect
enjoyment of a high level of
amenity
The appearance, aesthetics or
value of their property would
be diminished by soiling’
The people or property would
reasonably be expected to be
present continuously, or at
least regularly for extended
periods, as part of the normal
pattern of use of the land.
E.g. dwellings, museums and
other important collections,
medium and long term car
parks and car showrooms.
10 – 100 dwellings within 20
m of site.
Local PM10 concentrations
close to the objective (e.g.
annual mean 36 -40 μg/m3).
E.g. residential properties,
hospitals, schools and
residential care homes.
Locations with an
international or national
designation and the
designated features may be
affected by dust soiling.
Locations where there is a
community of a particularly
dust sensitive species such
as vascular species included
in the Red List for Great
Britain.
E.g. A Special Area of
Conservation (SAC). 
Medium Users would expect to enjoy a
reasonable level of amenity,
but would not reasonably
expect to enjoy the same level
of amenity as in their home.
The appearance, aesthetics or
value of their property could be
diminished by soiling
The people or property
wouldn’t reasonably be
expected to be present here
continuously or regularly for
extended periods as part of
the normal pattern of use of
the land.
E.g. parks and places of work.
Less than 10 receptors
within 20 m.
Local PM10 concentrations
below the objective (e.g.
annual mean 30-36 μg/m3). 
E.g. office and shop workers
but will generally not include
workers occupationally
exposed to PM10 as
protection is covered by the
Health and Safety at Work
legislation.
Locations where there is a
particularly important plant
species, where its dust
sensitivity is uncertain or
unknown.
Locations with a national
designation where the
features may be affected by
dust deposition
E.g. A Site of Special
Scientific Interest (SSSI) with
dust sensitive features.
Low The enjoyment of amenity
would not reasonably be
expected.
Property would not reasonably
be expected to be diminished
in appearance, aesthetics or
value by soiling.
There is transient exposure,
where the people or property
would reasonably be expected
to be present only for limited
periods of time as part of the
Locations where human
exposure is transient.
No receptors within 20 m.
Local PM10 concentrations
well below the objectives
(less than 75%).
E.g. public footpaths, playing
fields, parks and shopping
streets.
Locations with a local
designation where the
features may be affected by
dust deposition.
E.g. Local Nature Reserve
with dust sensitive features.

Page 285

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 38 - 
Table B1: Examples of Factors Defining Sensitivity of an Area 
Sensitivity
of Area
Dust Soiling Human Receptors Ecological Receptors
normal pattern of use of the
land.
E.g. playing fields, farmland
unless commercially sensitive
horticultural, footpaths, short
lived car [parks and roads. 
Table B2: Sensitivity of the Area to Dust Soiling on People and Property
Receptor
Sensitivity
Number of
Receptors
Distance from the Source (m)
<20 <50 <100 <350 
High
>100 High High Medium Low
10-100 High Medium Low Low
1-10 Medium Low Low Low
Medium >1 Medium Low Low Low
Low >1 Low Low Low Low 
Table B3: Sensitivity of the Area to Human Health Impacts
Receptor
Sensitivity
Annual Mean
PM10
Concentration
Number of
Receptors
Distance from Source (m)
<20 <50 <100 <200 <350
High >32 μg/m3 >100 High High High Medium Low
10-100 High High Medium Low Low
1-10 High Medium Low Low Low
28-32 μg/m3 >100 High High Medium Low Low
10-100 High Medium Low Low Low
1-10 High Medium Low Low Low
24-28 μg/m3 >100 High Medium Low Low Low
10-100 High Medium Low Low Low
1-10 Medium Low Low Low Low
<24 μg/m3 >100 Medium Low Low Low Low
10-100 Low Low Low Low Low
1-10 Low Low Low Low Low

Page 286

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 39 - 
Table B3: Sensitivity of the Area to Human Health Impacts
Receptor
Sensitivity
Annual Mean
PM10
Concentration
Number of
Receptors
Distance from Source (m)
<20 <50 <100 <200 <350
Medium >32 μg/m3 >10 High Medium Low Low Low
1-10 Medium Low Low Low Low
28-32 μg/m3 >10 Medium Low Low Low Low
1-10 Low Low Low Low Low
24-28 μg/m3 >10 Low Low Low Low Low
1-10 Low Low Low Low Low
<24 μg/m3 >10 Low Low Low Low Low
1-10 Low Low Low Low Low
Low - >1 Low Low Low Low Low 
Table B4: Sensitivity of the Area to Ecological Impacts
Receptor
Sensitivity
Distance from the Source (m)
<20 <50
High High Medium
Medium Medium Low
Low Low Low
Define the Risk of Impacts
The final step is to combine the dust emission magnitude determined in step 2A with the sensitivity
of the area determined in step 2B to determine the risk of impacts with no mitigation applied. Tables 
B5 to B7 indicate the method used to assign the level of risk for each construction activity. The
identified level of risk is then used to determine measures for inclusion within a site-specific
Construction Management Plan (CMP) aimed at reducing dust emissions and hence reducing the
impact of the construction phase on nearby receptors. The mitigation measures are drawn from
detailed mitigation set out within the IAQM guidance document.

Page 287

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 40 - 
Table B5: Risk of Dust Impacts from Demolition
Sensitivity of Area Large Medium Small
High High Risk Medium Risk Medium Risk
Medium High Risk Medium Risk Low Risk
Low Medium Risk Low Risk Negligible 
Table B6: Risk of Dust Impacts from Earthworks/ Construction
Sensitivity of Area Large Medium Small
High High Risk Medium Risk Low Risk
Medium Medium Risk Medium Risk Low Risk
Low Low Risk Low Risk Negligible 
Table B7: Risk of Dust Impacts from Trackout
Sensitivity of Area Large Medium Small
High High Risk Medium Risk Low Risk
Medium Medium Risk Low Risk Negligible
Low Low Risk Low Risk Negligible

Page 288

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 41 - 
Appendix C
Construction Mitigation Measures
It is recommended that the following measures are incorporated into a DMP and approved by PKC
prior to commencement of any work on site. The measures set out below summaries the measures
set out within the IAQM guidance. 
This guidance should be read in conjunction with this report to obtain full details of all the measures
that should be applied on site.
It is recommended that the following preferred measures are implemented during the construction
phase:
• display the name and contact details of the person accountable for air quality and dust
issues on the site boundary (i.e. the environment manager/engineer or site manager);
• display the head or regional office contact information on the site boundary;
• record all dust and air quality complaints, identify cause, take appropriate measures to
reduce emissions in a timely manner and record the measures taken;
• make the complaints log available to the local authority when asked;
• record any exceptional incidents that cause dust and/or air emissions, either on- or off- site
and the action taken to resolve the situation in the log book;
• carry out regular site inspections to monitor compliance with the DMP, record inspection
results and make inspection log available to PKC when asked;
• increase frequency of site inspection by the person accountable for air quality and dust
issues on site when activities with a high potential to produce dust are being carried out and
during prolonged periods of dry or windy conditions;
• plan site layout so that machinery and dust causing activities are located away from
receptors, as far as is possible;
• erect solid screens or barriers around dusty activities or the site boundary that are at least as
high as any stockpiles;
• avoid site runoff of water or mud;
• ensure all vehicles switch off engines when stationary - no idling vehicles;
• avoid the use of diesel or petrol powered generators and use mains electricity or battery
powered equipment where practicable; produce a Construction Logistics Plan to manage the
sustainable delivery of goods and materials;

Page 289

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 42 - 
• only use cutting, grinding or sawing equipment fitted or in conjunction with suitable dust
suppression techniques such as water sprays or local extraction e.g. suitable local exhaust
ventilation systems;
• ensure an adequate water supply on site for effective dust/particulate matter
suppression/mitigation, using non-potable water where possible and appropriate;
• use enclosed chutes and conveyors and covered skips;
• minimise drop heights from conveyors, loading shovels, hoppers and other loading or
handling equipment and use fine water sprays on such equipment wherever appropriate;
• avoid bonfires and burning of waste materials; 
The following desirable measures should also be considered for inclusion to further reduce
emissions:
• undertake daily on-site and off-site inspections, where receptors (including roads) are
nearby, to monitor dust, record inspection results and make the log available to the local
authority when asked. This should include regular dust soiling checks of surfaces such as
street furniture, cars, window sills within 100 m of site boundary, with cleaning to be provided
if necessary;
• fully enclose site or specific operations where there is a high potential for dust production
and the activities are being undertaken for an extensive period;
• keep site fencing, barriers and scaffolding clean using wet methods;
• remove materials that have a potential to produce dust from site as soon as possible, unless
being re-used on site. If being re-used on site, cover as detailed below;
• cover, seed or fence stockpiles to prevent wind whipping;
• ensure equipment is readily available on site to clean any dry spillages, and clean up
spillages as soon as reasonably practicable after the event using wet cleaning methods;
• avoid scabbling where possible;
• ensure sand and other aggregates are stored in bunded areas and are not allowed to dry
out, unless this is required for a particular process, in which case ensure that appropriate
additional control measures are in place;
• use water-assisted dust sweepers on the access and local roads, to remove, as necessary,
any material tracked out of the site;
• avoid dry sweeping of large areas;
• ensure vehicles entering and leaving the site are covered to prevent the escape of materials
during transport.

Page 290

Air Quality Assessment                                                                                                                       Perth Road, Blairgowrie
A6760                                                                                                                                     October 2024
- 43 - 
• use water-assisted dust sweepers on the access and local roads, to remove, as necessary,
any material tracked out of the site;
• avoid dry sweeping of large areas;
• ensure vehicles entering and leaving the site are covered to prevent the escape of materials
during transport;
• record all inspections of haul routes and any subsequent action in a site log book;
• implement a wheel washing system (with rumble grids to dislodge accumulated dust and
mud);
• ensure there is adequate area of hard surfaced road between the wheel wash facility and the
site exit where ever site size and layout permits.

Page 291

Noise Impact Assessment
Proposed McDonald’s Restaurant, Perth Road, Blairgowrie 
6th November 2024
Rev A 11th November 2024, Rev B 27th June 2025, Rev C 7th July 2025, Rev D 8th July 2025, Rev E 25th July 2025,
Rev F 1st August 2025
Report Reference Number: A6760

Page 292

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |2 
Document Control 
Date of first Issue Revision Date of Revision Authored By Reviewed by
6th October 2024 - - Ben Phipps 
BSc, AMIOA MJB 
A 11th November 2024 Ben Phipps 
BSc, AMIOA MJB 
B 27th June 2025 Ben Phipps 
BSc, AMIOA MJB 
C 7th July 2025 Ben Phipps 
BSc, AMIOA MJB 
D 8th July 2025 Ben Phipps 
BSc, AMIOA MJB 
E 25th July 2025 Ben Phipps 
BSc, AMIOA MJB 
F 1st August 2025 Ben Phipps 
BSc, AMIOA MJB

Page 293

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |3
Contents
Executive Summary .......................................................................... 5
1  Introduction .............................................................................. 7
1.1 Overview .......................................................................................... 7
2 Site Description & Background Information ......................................... 8
2.1 Site & Surrounding Area ........................................................................ 8
2.2 Background ....................................................................................... 8
3 Legislation, Policy and Guidance ...................................................... 9
3.1 BS4142: 2014 ‘Methods for rating and assessing industrial and commercial sound .... 9
4 Environmental Noise Survey ......................................................... 11
4.1 Measurement Methodology .................................................................... 11
4.2 Instrumentation ................................................................................. 11
4.3 Weather Conditions ............................................................................ 12
4.4 Survey Results ................................................................................... 12
5 Specific Sound Sources ............................................................... 14
5.1 Customer Vehicle Noise ........................................................................ 14
5.2 Customer Order Display ........................................................................ 16
5.3 Fixed Plant Installations ....................................................................... 18
5.4 Delivery Noise ................................................................................... 18
5.5 Waste Collection ................................................................................ 19
5.6 Determining the Specific Sound Level ....................................................... 21
6 BS 4142:2014 Assessments ........................................................... 23
6.1 BS 4142 Assessment Tables .................................................................... 23
6.2 Discussion ............................................................................... 50
6.2.1 Overview .................................................................................. 50
6.2.2 Context .................................................................................... 50
6.2.3 Rating Level Assessment ................................................................ 51
6.2.4 On-time Impact ........................................................................... 52
6.2.5 Uncertainty ............................................................................... 52
7 Assessment of Impacts ................................................................ 53
8 Night-time Plant Noise Impact Assessment ........................................ 54
9 Conclusions ............................................................................. 63
Appendix A – Acoustic Terminology & Definitions ..................................... 65
Appendix B – Carpark and Drive-Thru Vehicle Movement Noise Emissions Tables 67
Appendix C – Customer Order Display Noise Emission Tables ........................ 94
Appendix D – Fixed Plant Installations Noise Emissions ............................... 98
Appendix E – Delivery Noise Emissions Tables ......................................... 107
Appendix F – Waste Collection Noise Emissions Tables .............................. 112
Appendix G – Specific Sound Levels Tables ............................................ 114
Appendix H – Predicted Vehicle Movements ........................................... 123
Appendix I – Proposed Site Plan ......................................................... 124

Page 294

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |4
Appendix J – Proposed 1.8m Fence Line ............................................... 125
Appendix K – Fixed Plant Noise Levels (Including Mitigation Measures) ........... 126

Page 295

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |5
Executive Summary 
A sound survey was undertaken to inform the assessment of the likelihood of adverse impact from
the proposed McDonald’s restaurant with associated car park and drive-thru facility Westpark Retail
Park, off Perth Road, Blairgowrie. The sound survey was carried out in compliance with BS 4142 as
detailed in this report. The sound survey considers the impacts at nine noise-sensitive receptors
including four existing receptors on the opposite side of Perth Road to the site, Lodge, Ardlui,
Langdale and Kinvaid. The other five receptors are approved future dwellings that are to built
immediately to the north of the site.
Sound measurements were taken at one location representing the most exposed noise-sensitive
receptors. Noise measurements were taken from other sites to represent noise sources that will be
associated with the proposed site, such as car park vehicle movements and deliveries. Sound levels
associated with noise sources such as mechanical plant and refuse collections have been established
from British Standards and Manufacturer datasheets. 
The initial assessment of the typical worst-case daytime period indicates that adverse impact is not
likely at any of the nearby noise-sensitive receptors. The contextual considerations required by BS
4142, particularly the nature of the source within the residual environment and acoustic design
measures being incorporated at the most-exposed noise-sensitive receptors suggest that the impact
is likely to be lower than predicted by the initial BS 4142 assessment. 
The initial assessment of the absolute worst-case daytime period, where waste collections are
taking place in the same one-hour period as when the car park and drive-thru are at their busiest
indicates that adverse impact is not likely at Lodge, Ardlui, Langdale, Kinvaid and proposed dwelling
1. The contextual considerations required by BS 4142, particularly the nature of the source within
the residual environment and acoustic design measures being incorporated at the most-exposed
noise-sensitive receptors suggest that the impact is likely to be lower than predicted by the initial
BS 4142 assessment. 
The initial assessment of the absolute worst-case daytime period, where waste collections are
taking place in the same one-hour period as when the car park and drive-thru are at their busiest
indicates that adverse impact is likely at proposed dwelling 2. The contextual considerations
required by BS 4142, particularly the nature of the source within the residual environment and
acoustic design measures being incorporated at the most-exposed noise-sensitive receptors suggest
that the impact is likely to be lower than predicted by the initial BS 4142 assessment. 
The initial assessment of the absolute worst-case daytime period predicts that significant adverse
impact is likely at Proposed Dwellings 3, 4 and 5. Considering that the rating sound level is only just
above the level difference that indicates likelihood of significant adverse impact at all three
receptors, close consideration should be given to contextual factors. The contextual considerations

Page 296

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |6
required by BS 4142, particularly the nature of the source within the residual environment and
acoustic design measures being incorporated at the most-exposed noise-sensitive receptors suggest
that the impact is likely to be lower than predicted by the initial BS 4142 assessment. Additionally,
waste collections which are likely to be required regardless of the development that would be built
on the plot, occur sparingly, meaning that this assessment is not a representation of typical site
operation. 
The initial assessment of the worst-case night-time period when the restaurant is open and the
carpark and drive-thru are in use indicates that significant adverse impact is likely. The difference
between the specific sound level and the background sound level is substantial, meaning that there
is a high degree of confidence and uncertainty is diminished, and the relevance of contextual
considerations in this instance is reduced. 
It is recommended that the proposed 1.1m surrounding the drive-thru lane be upgraded to an
acoustic fence with a minimum height of 1.8m. The fence should have a minimum mass of 10kg/m2
and not have holes or gaps present. 
Some items of fixed mechanical plant are to continue running if the facility stops trading during the
night-time period. Although the calculations suggest that the cumulative plant noise level will
exceed the prevailing background sound level by 8dB – 11dB, which indicates adverse or significant
adverse impact, plant noise levels inside are still expected to comply with the internal ambient
noise level outlined in BS 8233:2014 in all of the receptors considering that the attenuation that
can be achieved with a partially open window should result in plant noise level that is well below
the indoor ambient noise level target for the night-time inside a bedroom. If windows were at the
dwellings were to be closed the plant noise level would fall even further below the internal ambient
noise level target as specified in BS 8233:2014 inside the bedrooms, as a standard double glazing
system typically provides at least 24 dB of attenuation.

Page 297

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |7
1  Introduction
1.1 Overview 
Encon Associates Ltd have been commissioned to prepare an environmental noise impact assessment
for a proposed McDonald’s Restaurant with an associated car park and drive-thru facility on
Westpark Retail Park, off Perth Road, Blairgowrie.
The following report has been produced to accompany a planning application that is to be submitted
to Perth and Kinross Council.       
This report details existing background sound levels at the noise-sensitive receptors considered as
the worst affected, as well as noise emissions associated with the operations that are to take place. 
Due to the necessary technical nature of the report, a glossary of terms can be found in Appendix
A to assist the reader.

Page 298

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |8
2 Site Description & Background Information
2.1 Site & Surrounding Area 
The site is located on Westpark Retail Park off Perth Road, Blairgowrie. Immediately to the north
of the site is currently arable land which has been approved for housing development. Immediately
to the east is Perth Road, which facilitates regular traffic flow during daytime hours. Directly
opposite the site on the other side of Perth Road are no.4 residential dwellings, The Lodge, Ardlui,
Langdale and Kinvaid. Immediately to the south of the south of the site is a Starbucks café with a
car park and drive-thru facility. The opening hours of the Starbucks are believed to be 07:00-21:00
daily. Home Bargains and Lidl, also associated with Westpark Retail Park, are situated to the south
of Starbucks. Home Bargains operates between 08:00 and 20:00 from Monday to Saturday and 08:00
and 18:00 on Sundays. Lidl is believed to be open 08:00-22:00 daily. 
Figure 1.0 – Site and Surrounding Area
2.2 Background 
It is proposed that a McDonald’s Restaurant with an associated car park and drive-thru facility with
side-by-side customer order displays (CODs) be erected at Westpark Retail Park off Perth Road,
Blairgowrie. McDonald’s are seeking permission to trade 24/7 from this new facility. Consequently,
a noise impact assessment was required to determine the likelihood of adverse impact upon nearby
residents. The existing acoustic environment is dominated by road traffic along Perth Road. The
assessment considers the four existing residential dwellings on the opposite side  of Perth Road, as
well the five closest dwellings from the Approved Housing Development to be the most exposed
noise-sensitive receptors. 
Perth
Road
Lidl
Approx. Site
Boundary
Ardlui 
Home
Bargains
The Lodge
Starbucks
Westpark
Retail Park
St Stephens Primary
School/Blairgowrie
Community Campus
Langdale
Kinvaid
Approved
Housing
Development

Page 299

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |9
3 Legislation, Policy and Guidance
This report is based on the following policy, guidance and legislation. 
3.1 BS4142: 2014 ‘Methods for rating and assessing industrial and commercial
sound 
British Standard 4142: 2014 describes methods for rating and assessing sound of an industrial and/or
commercial nature, which includes: 
• Sound from industrial and manufacturing processes; 
• Sound from fixed installations which comprise mechanical and electrical plant and
equipment; 
• Sound from the loading and unloading of goods and materials and/or commercial premises;
and 
• Sound from mobile plant and vehicles that is an intrinsic part of the overall sound emanating
from premises or processes, such as the from fork-lift trucks, or that from train or ship
movements on or around an industrial and/or commercial site. 
The methods described in the standard use outdoor sound levels to assess the likely effects of sound
on people who might be inside or outside a dwelling or premises used for residential purposes upon
which sound is incident. 
The standard presents methods to measure and determine ambient, background and residual sound
levels, and the rating levels of industrial/commercial sound. BS4142:2014requires consideration of
the level of uncertainty in the data and associated calculations. 
The determination of noise amounting to a nuisance is beyond the scope of BS4142. The standard
stipulates that it not intended to be applied to the rating and assessment of sound from the passage
of vehicles of vehicles on public roads and railway systems, recreational activities, music and
entertainment, shooting grounds, construction and demolition, domestic animals, public address
systems and other sources not specified within the document. 
The Reference Time Interval, T, is defined in the standard as the “specified interval over which the
specific sound level is determined”, which is 1 hour during the daytime (07:00 to 23:00 hours) and
15 minutes during the night (23:00 to 07:00 hours). 
Ambient sound is defined as "totally encompassing sound in a given situation at a given time, usually
composed of sound from many sources near and far". It comprises the residual sound and the specific
sound when present. 
Residual sound is defined as "ambient sound remaining at the assessment location when the specific
sound source is suppressed to such a degree that it does not contribute to the ambient sound". 
The background sound level is the LA90, T of the residual sound level, and is the underlying level of
sound. Measurements of background sound level should be undertaken at the assessment location
where possible or at a comparable location. 
The measurement time interval should be sufficient to obtain a representative value (normally not
less than 15 minutes) and the monitoring duration should reflect the range of background sound
levels across the assessment period. The background sound level used for the assessment should be
representative of the period being assessed. 
The specific sound level is the LAeq,T of the sound source being assessed over the reference time
interval, Tr. BS 4142: 2014 advises that Tr should be 1 hour during the day and 15 minutes at night.

Page 300

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |10
The rating level is the specific sound level plus any adjustment for the characteristics that are
present with the sound including tonality, impulsivity, intermittency or other acoustic
characteristics.  The standard describes subjective and objective methods to establish the
appropriate adjustment. The characteristics and coinciding adjustments are defined as: 
• Tonality: A rating penalty of + 2dB is applicable for a tone which I “just perceptible”, +4 dB
where a tone is “clearly perceptible”, and +6 dB where a tone is “highly perceptible”. 
• Impulsivity: A rating penalty of +3 dB is applicable for impulsivity which is “just
perceptible”, +6 dB where it is “clearly perceptible”, and +9 dB where it is “highly
perceptible”. 
• Intermittency: When the specific sound has identifiable on/off conditions, the specific
sound level ought to be representative of the time period of length equal to the reference
time interval which contains the greatest total amount of on-time if the intermittency is
readily distinctive against the residual acoustic environment, a penalty of +3dB can be
applied.” 
• Other Sound Characteristics: Where the specific sound features that are neither tonal nor
impulsive but are otherwise readily distinctive against the residual acoustic environment, a
3 dB penalty can be applied.   
The level of impact is assessed by comparing the rating level with the background sound level.
Typically the greater the difference between the rating level and background sound level the
greater the magnitude of impact, depending on context. A difference of +5 dB is likely to indicate
an adverse impact and a difference of +10 dB is likely is likely to indicate a significant adverse
impact, depending on context.

Page 301

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |11
4 Environmental Noise Survey
To characterise the acoustic environment of the area, an unattended noise survey was carried out
on the 6th and 7th of August 2024. Additional measurements were also taken on the 25th and 26th of
February 2025. 
4.1 Measurement Methodology 
Attended monitoring was carried out at one measurement position (MP1). The sound level meter
was positioned approximately 15m from the edge of Perth Road, an equal distance from the edge
of Perth Road as the properties opposite. The microphone was mounted onto a tripod 1.5m above
the ground in free-field conditions (more than 3.5m from any reflective surfaces apart from the
ground). On the 6th and 7th of August 2024, measurements were taken during the daytime period
between 10:00 and 17:00 using a method similar to the shortened CRTN measurement method to
obtain background sound levels that are representative of the daytime period, and between 00:00
and 02:00 during the night-time to represent the most sensitive night-time period.  This
measurement position was chosen to obtain background sound levels that are representative of the
most exposed noise-sensitive receptor. Additional measurements were taken on the 25th and 26th of
February 2025 at the same monitoring location to obtain measurements of the late evening period
and the end of the night-time period to the beginning of the daytime period (06:00 – 08:30). 
Figure 2.0 – Measurement Positions 
4.2 Instrumentation 
Equipment Serial No. Laboratory Calibration 
Rion NL52 Class 1 Sound Level Meter 0034848 10/01/2023
Table 1.0 – Instrumentation 
MP1 NSR
NSR
1
2
3
4 5

Page 302

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |12
All sound level meters were field calibrated immediately before and after the measurement period
and no significant drift (≤0.5 dB) occurred. Laboratory calibration by a third-party is carried out on
all sound level meters every twenty-four months with all calibrators being calibrated every twelve
months. All microphones were fitted with a protective windshield. 
4.3 Weather Conditions 
Meteorological conditions from 6th – 7th August 2024 and 25th – 26th February 2025 were considered
suitable i.e. in accordance with those laid out in BS 7445-2:1991 and provided no significant
uncertainty to the measured data. 
4.4 Survey Results 
The following tables show the results of the attended noise survey. These tables display the 15-
minute LA90, LA10 LAeq, and LAFmax sound levels at Measurement Position 1 during the daytime and
night-time periods. 
Daytime (07:00 – 23:00)  LAeq LAmax LA10 LA90
Tuesday 6th August 2024
(11:44:13 – 11:59:13)
62.1 75.3 65.7 47.2
Tuesday 6th August 2024
(11:59:13 – 12:14:13)
62.1 70.8 66.0 46.8
Tuesday 6th August 2024
(12:14:13 – 12:29:13)
61.6 71.8 65.5 47.4
Tuesday 6th August 2024
(12:29:13 – 12:44:13)
62.0 73.5 65.7 48.4
Tuesday 6th August 2024
(12:44:13 – 12:59:13)
62.3 74.2 65.9 50.7
Tuesday 6th August 2024
(12:59:13 – 13:14:13)
61.9 73.9 65.7 46.9
Tuesday 6th August 2024
(13:14:13 – 13:29:13)
62.5 77.2 65.8 51.8
Tuesday 6th August 2024
(13:29:13 – 13:44:13)
62.1 73.3 65.9 51.5
Tuesday 6th August 2024
(13:59:13 – 14:14:13)
61.6 71.7 65.2 49.9
Tuesday 6th August 2024
(14:14:13 – 14:29:13)
61.9 74.7 65.6 50.1
Tuesday 6th August 2024
(14:29:13 – 14:44:13)
61.8 72.7 65.6 48.7
Tuesday 25th February 2025
(19:45:00 – 20:00:00)
58.2 71.1 60.8 42.4
Tuesday 25th February 2025
(20:00:00 – 20:15:00)
56.0 71.0 60.9 40.7
Tuesday 25th February 2025
(20:15:00 – 20:30:00)
53.1 65.7 58.0 40.2
Tuesday 25th February 2025
(20:30:00 – 20:45:00)
53.8 65.9 58.6 39.3
Tuesday 25th February 2025
(20:45:00 – 21:00:00)
54.9 75.8 58.4 40.8
Tuesday 25th February 2025
(21:00:00 – 21:15:00)
54.0 69.7 58.6 40.8
Tuesday 25th February 2025
(21:15:00 – 21:30:00)
53.5 68.9 58.1 36.7
Tuesday 25th February 2025
(21:30:00 – 21:45:00)
53.7 67.7 58.3 37.5

Page 303

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |13
Tuesday 25th February 2025
(21:45:00 – 22:00:00)
53.4 68.0 56.6 36.4
Tuesday 25th February 2025
(22:00:00 – 22:15:00)
52.4 66.5 54.4 34.1
Tuesday 25th February 2025
(22:15:00 – 22:30:00)
51.9 65.3 53.9 33.7
Tuesday 25th February 2025
(22:30:00 – 22:45:00)
49.8 62.3 52.8 33.1
Tuesday 25th February 2025
(22:45:00 – 23:00:00)
47.6 61.1 52.2 32.8
Wednesday 26th February 2025
(07:00:00 – 07:15:00)
54.9 67.5 58.0 35.6
Wednesday 26th February 2025
(07:15:00 – 07:30:00)
56.3 68.3 59.6 39.7
Wednesday 26th February 2025
(07:30:00 – 07:45:00)
57.1 68.5 60.3 40.1
Wednesday 26th February 2025
(07:45:00 – 08:00:00)
59.7 69.2 62.7 41.1
Wednesday 26th February 2025
(08:00:00 – 08:15:00)
60.7 70.3 63.8 42.5
Wednesday 26th February 2025
(08:15:00 – 08:30:00)
61.8 70.5 65.0 43.5
Table 2.0 – Daytime Environmental Noise Survey Results – MP1 
Night-time (23:00 – 07:00)  LAeq LAmax LA10 LA90
Wednesday 7th August 2024
(00:43:10 – 00:58:10)
48.9 74.3 34.4 22.1
Wednesday 7th August 2024
(00:58:10 – 01:13:10)
38.1 60.7 30.6 18.3
Wednesday 7th August 2024
(01:13:10 – 01:28:10)
25.5 43.1 26.7 19.9
Wednesday 7th August 2024
(01:28:10 – 01:43:10)
29.4 61.7 23.4 18.1
Wednesday 26th February 2025
(06:00:00 – 06:15:00)
49.1 61.6 51.1 26.8
Wednesday 26th February 2025
(06:15:00 – 06:30:00)
50.2 62.0 52.9 27.6
Wednesday 26th February 2025
(06:30:00 – 06:45:00)
51.7 62.9 54.3 28.9
Wednesday 26th February 2025
(06:45:00 – 07:00:00)
53.1 64.1 56.9 31.1
Table 3.0 – Night-time Environmental Survey Results – MP1 
Tables 2 and 3 demonstrate the range of background sound levels at the noise-sensitive receptors.
Considering that the background sound levels have not been influenced by on-site activity, the LA90,
15min measured sound levels during the same periods that activities are taking place are to be used
for the assessment.

Page 304

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |14
5 Specific Sound Sources
5.1 Customer Vehicle Noise 
To assess whether noise from the car park will have an impact on nearby residents, secondary data
has been used from a survey carried out at an existing McDonald’s site. The following table shows
sound levels associated with car park and drive-thru vehicle movements. 
Source Measurement
Distance (m) 
Time (s) Sound Level
dB LAeq, T
Sound
Exposure Level
(LAE)
Drive Thru – drive off
street and stop at COD 
5 10 65 75
Engine Idling – Making
Order
5 63 58 76
Drive to Pay Point 7 6 67 75
Engine Idling – Pay Point 5 20 58 71
Drive to Collection Point 5 8 67 77
Engine Idling - Collection
Point
5 20 58 71
Car Driving off from
Collection Point
5 9 71 81
Car Pulling Drive-Thru into
Car Park
5 9 71 81
Car Pulling into Car Park 6 6 67 75
Car Pulling off onto street 8 7 64 72
Car Reversing  7 10 56 66
Car Pulling off Parking
Space
4 6 63 70
Car Engine Starting  5 6 62 68
Car Passage  3 6 65 73
Car Door Slam 1 6 81 90 
Table 4.0 – Individual Noise Sources from Vehicle Movements 
Using this data, it is possible to predict the noise levels from the car park during the busiest period.
The following table predicts the noise levels from the car park over the busiest one-hour daytime
period at the noise-sensitive receptor based on a table of comings and goings provided by Andrew
Moseley Associates (Appendix B). The transport assessment predicts that the busiest one-hour period
consists of 115 vehicles coming onto the site. Of the inbound vehicles, 77 vehicles will use the drive-
thru, whilst the other 38 vehicles will use the customer carpark. The table does not provide the
number of outgoings from the carpark. Therefore, the assumption has been made that all 77 vehicles
using the drive-thru and half those using the carpark will leave within the same hour.

Page 305

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |15
Where there is no line of sight between the source and receptor a -10 dB screening correction has
been applied (BS 5228: 2009). Where the source is partly visible, a -5 dB screening correction has
been applied (BS 5228: 2009). It is understood that a 1.1m high close-boarded timber fence is to be
installed around the drive-thru part of the site. However, the receptors are elevated above the
carpark/drive-thru, and it is assumed that a fence of this height will not remove the line of sight
between the vehicle movements and the dwellings. Initial calculations indicated that during the
busiest hour daytime period, noise levels from the associated carpark and drive-thru will be well
above the measured daytime background sound levels at the noise-sensitive receptors. Therefore,
it is highly recommended that the height of the close-boarded fence be extended from 1.1m to a
minimum of 1.8m to remove the line of sight between the source and the receptors. The fence
should have a minimum mass of 10kg/m2 and no gaps or holes present.  The restaurant building
itself should also provide screening from vehicle movements taking place in the middle of the
carpark. The following table shows the predicted noise emissions for Cark Park and Drive-Thru
movements at all of the considered receptors during the daytime. A detailed breakdown of the
cumulative 1-hour figures can be found in Appendix B.   
Receptor dB LAeq, 1hour 
Lodge 44
Ardlui 45
Langdale 42
Kinvaid 41
Proposed Dwelling 1 43
Proposed Dwelling 2 47
Proposed Dwelling 3 49
Proposed Dwelling 4 47
Proposed Dwelling 5 48
Table 5.0 – Car Park and Drive-Thru Movement Noise Emissions at Receptors – Daytime 
The following table shows the predicted noise emissions for Cark Park and Drive-Thru movements
during the night-time period at all considered receptors. The transport assessment predicts that
the busiest one-hour night-time period consists of 31 vehicles coming onto the site. Of the inbound
vehicles, it is predicted that 15 vehicles will use the drive-thru, whilst the other 16 vehicles will
use the customer carpark. These values have been divided by four to represent a 15-minute period.
The assumption has been made that all 4 vehicles using the drive-thru will leave site within the
same 15-minute period. It is assumed that two of the vehicles using the car park will leave within
the same 15-minute period. The assessments at the proposed new dwellings consider the first-floor
bedrooms consider he first-floor bedrooms as the receptors during the night-time. A detailed
breakdown of the cumulative 15-minute figures can be found in Appendix H.

Page 306

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |16 
Receptor dB LAeq, 15min 
Lodge 39
Ardlui 38
Langdale 36
Kinvaid 34
Proposed Dwelling 1 43
Proposed Dwelling 2 46
Proposed Dwelling 3 47
Proposed Dwelling 4 46
Proposed Dwelling 5 46
Table 6.0 – Car Park and Drive-Thru Movement Noise Emissions at Receptors – Night-time 
5.2 Customer Order Display 
There are two customer order display units in the drive-thru facility where customers place their
orders. Sound measurements were taken of the member of staff conversing with a customer which
was emitted from the speaker of the customer order display at a McDonald’s in Arnold, Nottingham.
The table below shows the associated sound levels. 
Source Measurement
Distance (m) 
Time (s) Sound Level
dB LAeq, T
Sound
Exposure Level
(LAE)
Customer Order Display  0.5 7 79 87
Table 7.0 – Individual Noise Source – Customer Order Display 
The following table shows the predicted noise emissions for Customer Order Displays at all of the
considered receptors during the daytime. A detailed breakdown of the cumulative 1-hour figures
can be found in Appendix C.

Page 307

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |17
Receptor dB LAeq, 1hour 
Lodge 28
Ardlui 31
Langdale 33
Kinvaid 32
Proposed Dwelling 1 23
Proposed Dwelling 2 32
Proposed Dwelling 3 30
Proposed Dwelling 4 32
Proposed Dwelling 5 33
Table 8.0 – Customer Order Displays Noise Emissions at Receptors – Daytime 
The following table shows the predicted noise emissions for Customer Order Displays at all of the
considered receptors during the daytime. A detailed breakdown of the cumulative 15-minute figures
can be found in Appendix C.   
Receptor dB LAeq, 15min 
Lodge 12
Ardlui 15
Langdale 17
Kinvaid 16
Proposed Dwelling 1 21
Proposed Dwelling 2 30
Proposed Dwelling 3 28
Proposed Dwelling 4 30
Proposed Dwelling 5 31
Table 9.0 – Customer Order Displays Noise Emissions at Receptors – Night-time

Page 308

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |18
5.3 Fixed Plant Installations 
Items of mechanical plant are scheduled to be installed on the roof of the main building. Sound
level data has been obtained from manufacturer datasheets quoted as either A-weighted sound
pressure level at 1m or as a sound power level. The following table shows the sound levels associated
with all items of mechanical plant associated with the development and predict cumulative A-
weighted sound pressure levels at the closest noise sensitive receptors with all plant running
simultaneously.  It is understood that the items of plant will be shielded by a parapet, meaning that
there should be no line of sight between the plant and the receptors. Subsequently, a -10dB
screening correction has been applied (BS 5228:2009). 
Receptor dB LAeq, 1hour 
Lodge 39
Ardlui 39
Langdale 37
Kinvaid 35
Proposed Dwelling 1 33
Proposed Dwelling 2 37
Proposed Dwelling 3 38
Proposed Dwelling 4 38
Proposed Dwelling 5 38
Table 10.0 – Customer Order Displays Noise Emissions at Receptors – Daytime and Night-time 
5.4 Delivery Noise 
It is understood that the restaurant will require three deliveries per week, which will be made on a
tail lift HGV. The deliveries shall take place within the hours of 07:00 – 21:00 Monday – Friday and
09:00 – 19:00 Sunday. The delivery vehicle will enter the site and will park in front of the Corral.
The goods will be transported manually on trolleys into the Corral. Once the delivery has been
completed, the HGV will drive around the carpark to the exit and will pull out of the carpark.   
Sound Measurements were taken of a HGV delivery being made at a McDonald’s restaurant in Arnold,
Nottingham. The table below shows sound levels associated with the loading and unloading of goods
from the HGV.

Page 309

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |19
Source Measurement
Distance (m) 
Time 
(mm:ss)
Sound Level
dB LAeq, T
Sound
Exposure Level
(LAE)
Goods Loading and
Unloading 
6 13:10 71 100
HGV Engine Starting and
Idling
5 00:20 76 89
HGV Pulling Off 7 00:13 76 88
HGV Passage 5 00:11 73 83
Table 11.0 – Individual Noise Sources – Delivery 
The following table shows the predicted noise emissions from Deliveries at all of the considered
receptors during the daytime. A detailed breakdown of the cumulative 1-hour figures can be found
in Appendix E.   
Recptor dB LAeq, 1hour 
Lodge 35
Ardlui 36
Langdale 42
Kinvaid 35
Proposed Dwelling 1 42
Proposed Dwelling 2 46
Proposed Dwelling 3 41
Proposed Dwelling 4 46
Proposed Dwelling 5 44
Table 12.0 – Delivery Noise Emissions at Receptors – Daytime 
5.5 Waste Collection 
It is understood that waste from McDonald’s restaurants is stored in bins provided by a private
contractor employed by the franchisee. Subsequently, the company making the waste collections is
currently unknown, meaning that sound level data which relates specifically to waste collections at
this particular McDonald’s site cannot be obtained due to the potential difference in vehicles, bins
and the method of collection. It is understood that waste collections will take place on four
occasions per week during daytime hours. BS 5228:2009 provides sound level data for a refuse wagon
quoted at 10m, as shown in the following table.

Page 310

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |20
Source Octave Band Sound Pressure Levels @10m (Hz) A-weighted
sound pressure
level 
LAeq, T @10m
63  125 250 500 1k 2k 4k 8k
Refuse
Wagon 
88 81 79 76  72 70 64 60 78
Table 13.0 – Refuse Wagon Sound Levels 
It is assumed that each waste collection will take place over a 5-minute period. Therefore, the
activity on-time correction has been applied based on a 1-hour reference period. It is assumed that
the refuse wagon will pull into the same space as the delivery vehicle. The following tables show
the sound levels associated with the refuse wagon at the noise-sensitive receptors after the on-time
correction has been applied. 
The following table shows the predicted noise emissions from Waste Collections at all of the
considered receptors during the daytime. A detailed breakdown of the cumulative 1-hour figures
can be found in Appendix F.   
Receptor dB LAeq, 1hour 
Lodge 42
Ardlui 43
Langdale 42
Kinvaid 42
Proposed Dwelling 1 46
Proposed Dwelling 2 52
Proposed Dwelling 3 53
Proposed Dwelling 4 53
Proposed Dwelling 5 51
Table 14.0 – Refuse Wagon at Receptors – Daytime

Page 311

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |21
5.6 Determining the Specific Sound Level 
In order to carry out the BS 4142 assessments, the specific sound level must be determined.
Assuming that the site will be operating during both daytime and night-time hours, the specific
sound level must be determined for both daytime and night-time assessments based on the activities
that are likely to take place. BS 4142 stipulates a 1-hour daytime reference period. Vehicle
movements associated with the customer carpark and drive-thru facility are one of the main sources
of noise impact from the proposed development. As such, the worst-case daytime 1-hour period
considers the hour where the carpark and drive-thru are predicted to be at their busiest.  The
following table shows the specific sound level for the typical worst-case 1-hour daytime period at
all of the considered noise sensitive receptors. Tables demonstrating how the specific sound levels
have been calculated are shown Appendix G. 
Receptor dB LAeq, 1hour 
Lodge 45
Ardlui 46
Langdale 44
Kinvaid 43
Proposed Dwelling 1 43
Proposed Dwelling 2 48
Proposed Dwelling 3 49
Proposed Dwelling 4 48
Proposed Dwelling 5 48
Table 15.0 – Specific Sound Levels at Receptors – Typical Worst-Case Daytime 
It is understood that deliveries and waste collections will only take place during daytime hours. It
is highly unlikely that waste collections and goods deliveries will take place within the same hour
as when the carpark and drive-thru are at their busiest. Therefore, an ‘absolute worst-case’
scenario considers a waste collection taking place during the same hour as when the carpark and
drive-thru are predicted to be at their busiest. This ensures that the assessment is robust, as the
noise levels from waste collections are predicted to be greater than from deliveries at the noise
sensitive receptors. The operator should schedule delivery and waste collections where possible to
ensure that both events do not take place within the same 1-hour period. The following table shows
the specific sound level for the absolute worst-case 1-hour daytime period at all of the considered
noise sensitive receptors. Tables demonstrating how the specific sound levels have been calculated
are shown Appendix G.

Page 312

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |22
Source dB LAeq, 1hour 
Lodge 47
Ardlui 48
Langdale 46
Kinvaid 45
Proposed Dwelling 1 48
Proposed Dwelling 2 53
Proposed Dwelling 3 55
Proposed Dwelling 4 54
Proposed Dwelling 5 53
Table 16.0 – Specific Sound Levels at Receptors – Absolute Worst-Case Daytime 
Considering that deliveries and waste collections shall not take place between the hours of 23:00
and 07:00, these noise sources are not included in the specific sound level for the night-time
assessment. The worst-case night-time period considers the worst-case scenario in terms of vehicle
comings and goings. The following table shows the specific sound level for the worst-case 15-minute
night-time period at all of the considered noise sensitive receptors. Tables demonstrating how the
specific sound levels have been calculated are shown Appendix G. 
Source dB LAeq, 15min 
Lodge 42
Ardlui 42
Langdale 40
Kinvaid 39
Proposed Dwelling 1 43
Proposed Dwelling 2 46
Proposed Dwelling 3 48
Proposed Dwelling 4 47
Proposed Dwelling 5 47
Table 17.0 – Specific Sound Levels at Receptors – Night-time

Page 313

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |23
6 BS 4142:2014 Assessments
6.1 BS 4142 Assessment Tables 
Daytime Assessment – Typical Worst-Case – Lodge
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  45 dBLAeq,1hour  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru as well as noise emissions
from fixed plant installations.
Table 37.0 for determination of
specific sound level. 
Background Sound
Level
47 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The typical lowest background
LA90,15min value for the daytime
period.  
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
0 dB 9.2 No perceptible tones,
intermittency or impulsivity.  
Rating Level at
Receiver
45 dBA 9.1 
Excess of rating
level over
background level
(45 – 47) = -2 dBA  11 
Impact The Assessment
indicates that
adverse impact is not
likely, depending on
context
11 The excess of rating level over
background sound level is -
2dBA, which is 7dBA below the
level of difference that
indicates likelihood of adverse
impact, depending on context
Table 18.0 - BS 4142: 2014 Assessment – Daytime Assessment - Typical Worst-Case – Lodge

Page 314

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |24
Daytime Assessment – Absolute Worst-Case – Lodge
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  47 dBLAeq,1hour  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru, noise emissions from fixed
plant installations as well as the
contribution of stock deliveries
and waste collections. Table
38.0 for determination of
specific sound level.  
Background Sound
Level
47 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The typical lowest background
LA90,15min value for the daytime
period.  
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
Impulsivity:
Just Perceptible 
+3 dB  9.2 The sound of waste collections
can be impulsive in nature.
However, the presence of 1.8m
barrier and the substantial
physical distance between the
activities and the receptor mean
that the effect of impulsivity is
likely to be ‘just’ perceptible. 
No perceptible tones or
intermittency. 
Rating Level at
Receiver
50 dBA 9.1 
Excess of rating
level over
background level
(50 – 47) = +3 dBA  11 
Impact The Assessment
indicates that
adverse impact is not
likely, depending on
context
11 The excess of rating level over
background sound level is
+3dBA, which is 2dBA below the
level of difference that
indicates likelihood of adverse
impact, depending on context
Table 19.0 - BS 4142: 2014 Assessment – Daytime Assessment – Absolute Worst-Case – Lodge

Page 315

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |25
Night-time Assessment – Lodge
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  42 dBLAeq,15min  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru as well as noise emissions
from fixed plant installations.
Table 39.0 for determination of
specific sound level.  
Background Sound
Level
22 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The typical lowest background
LA90,15min value for the night-time
period.  
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
Impulsivity:
Just Perceptible
+3 dB  9.2 The sound of car doors closing is
impulsive in nature and the
background sound level is lower
during this period, meaning that
it is likely to be more noticeable
than during the daytime period.
However, it is predicted that
there will be far fewer instances
of doors being slammed relative
to the reference period.
Therefore, the effect of
impulsivity is considered likely
to be ‘just’ perceptible. 
No perceptible tones or
intermittency. 
Rating Level at
Receiver
45 dBA 9.1 
Excess of rating
level over
background level
(45 – 22) = +23 dBA  11 
Impact The Assessment
indicates that
significant adverse
impact is likely,
depending on
context
11 The excess of rating level over
background sound level is
+23dBA, which is 13dBA above
the level of difference that
indicates likelihood of
significant adverse impact,
depending on context
Table 20.0 - BS 4142: 2014 Assessment – Night-time Assessment – Lodge

Page 316

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |26
Daytime Assessment – Typical Worst-Case – Ardlui
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  46 dBLAeq,1hour  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru as well as noise emissions
from fixed plant installations.
Table 40.0 for determination of
specific sound level. 
Background Sound
Level
47 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the daytime
period.  
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
0 dB 9.2 No perceptible tones,
intermittency or impulsivity.  
Rating Level at
Receiver
46 dBA 9.1 
Excess of rating
level over
background level
(46 – 47) = -1 dBA  11 
Impact The Assessment
indicates that
adverse impact is not
likely, depending on
context
11 The excess of rating level over
background sound level is 
-1dBA, which is 6dBA below the
level of difference that
indicates likelihood of adverse
impact, depending on context
Table 21.0 - BS 4142: 2014 Assessment – Daytime Assessment - Typical Worst-Case – Ardlui

Page 317

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |27
Daytime Assessment – Absolute Worst-Case – Ardlui
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  48 dBLAeq,1hour  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru, noise emissions from fixed
plant installations as well the
contribution of stock deliveries
and waste collections. Table
41.0 for determination of
specific sound level.  
Background Sound
Level
47 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the daytime
period. 
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
Impulsivity:
Just Perceptible 
+3 dB  9.2 The sound of waste collections
can be impulsive in nature.
However, the presence of 1.8m
barrier and the substantial
physical distance between the
activities and the receptor mean
that the effect of impulsivity is
likely to be ‘just’ perceptible. 
No perceptible tones or
intermittency. 
Rating Level at
Receiver
51 dBA 9.1 
Excess of rating
level over
background level
(51 – 77) = +4 dBA  11 
Impact The Assessment
indicates that
adverse impact is not
likely, depending on
context
11 The excess of rating level over
background sound level is 
+4dBA, which is 1dBA below the
level of difference that
indicates likelihood of adverse
impact, depending on context
Table 22.0 - BS 4142: 2014 Assessment – Daytime Assessment – Absolute Worst-Case – Ardlui

Page 318

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |28
Night-time Assessment – Ardlui
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  42 dBLAeq,15min  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru as well as noise emissions
from fixed plant installations.
Table 30.0 for determination of
specific sound level.  
Background Sound
Level
22 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the night-time
period.
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
Impulsivity:
Just Perceptible
+3 dB  9.2 The sound of car doors closing is
impulsive in nature and the
background sound level is lower
during this period, meaning that
it is likely to be more noticeable
than during the daytime period.
However, it is predicted that
there will be far fewer instances
of doors being slammed relative
to the reference period.
Therefore, the effect of
impulsivity is considered likely
to be ‘just’ perceptible. 
No perceptible tones or
intermittency. 
Rating Level at
Receiver
45 dBA 9.1 
Excess of rating
level over
background level
(45 – 22) = +23 dBA  11 
Impact The Assessment
indicates that
significant adverse
impact is likely,
depending on
context
11 The excess of rating level over
background sound level is
+23dBA, which is 13dBA above
the level of difference that
indicates likelihood of
significant adverse impact,
depending on context
Table 23.0 - BS 4142: 2014 Assessment – Night-time Assessment – Ardlui

Page 319

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |29
Daytime Assessment – Typical Worst-Case – Langdale
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  44 dBLAeq,1hour  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru as well as noise emissions
from fixed plant installations.
Table 43.0 for determination of
specific sound level. 
Background Sound
Level
47 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the daytime
period.  
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
0 dB 9.2 No perceptible tones,
intermittency or impulsivity.  
Rating Level at
Receiver
44 dBA 9.1 
Excess of rating
level over
background level
(44 – 47) = -3 dBA  11 
Impact The Assessment
indicates that
adverse impact is not
likely, depending on
context
11 The excess of rating level over
background sound level is 
-3dBA, which is 8dBA below the
level of difference that
indicates likelihood of adverse
impact, depending on context
Table 24.0 - BS 4142: 2014 Assessment – Daytime Assessment - Typical Worst-Case – Langdale

Page 320

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |30
Daytime Assessment – Absolute Worst-Case – Langdale
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  46 dBLAeq,1hour  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru, noise emissions from fixed
plant installations as well the
contribution of stock deliveries
and waste collections. Table
44.0 for determination of
specific sound level.  
Background Sound
Level
47 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the daytime
period. 
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
Impulsivity:
Just Perceptible 
+3 dB  9.2 The sound of waste collections
can be impulsive in nature.
However, the presence of 1.8m
barrier and the substantial
physical distance between the
activities and the receptor mean
that the effect of impulsivity is
likely to be ‘just’ perceptible. 
No perceptible tones or
intermittency. 
Rating Level at
Receiver
49 dBA 9.1 
Excess of rating
level over
background level
(49 – 47) = +2 dBA  11 
Impact The Assessment
indicates that
adverse impact is not
likely, depending on
context
11 The excess of rating level over
background sound level is 
+2dBA, which is 3dBA below the
level of difference that
indicates likelihood of adverse
impact, depending on context
Table 25.0 - BS 4142: 2014 Assessment – Daytime Assessment – Absolute Worst-Case – Langdale

Page 321

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |31
Night-time Assessment – Langdale
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  40 dBLAeq,15min  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru as well as noise emissions
from fixed plant installations.
Table 45.0 for determination of
specific sound level.  
Background Sound
Level
22 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the night-time
period.
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
Impulsivity:
Just Perceptible
+3 dB  9.2 The sound of car doors closing is
impulsive in nature and the
background sound level is lower
during this period, meaning that
it is likely to be more noticeable
than during the daytime period.
However, it is predicted that
there will be far fewer instances
of doors being slammed relative
to the reference period.
Therefore, the effect of
impulsivity is considered likely
to be ‘just’ perceptible. 
No perceptible tones or
intermittency. 
Rating Level at
Receiver
43 dBA 9.1 
Excess of rating
level over
background level
(43 – 22) = +21 dBA  11 
Impact The Assessment
indicates that
significant adverse
impact is likely,
depending on
context
11 The excess of rating level over
background sound level is
+21dBA, which is 11dBA above
the level of difference that
indicates likelihood of
significant adverse impact,
depending on context
Table 26.0 - BS 4142: 2014 Assessment – Night-time Assessment – Langdale

Page 322

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |32
Daytime Assessment – Typical Worst-Case – Kinvaid
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  43 dBLAeq,1hour  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru as well as noise emissions
from fixed plant installations.
Table 46.0 for determination of
specific sound level. 
Background Sound
Level
47 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the daytime
period.  
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
0 dB 9.2 No perceptible tones,
intermittency or impulsivity.  
Rating Level at
Receiver
47 dBA 9.1 
Excess of rating
level over
background level
(43 – 47) = -4 dBA  11 
Impact The Assessment
indicates that
adverse impact is not
likely, depending on
context
11 The excess of rating level over
background sound level is 
-4dBA, which is 9dBA below the
level of difference that
indicates likelihood of adverse
impact, depending on context
Table 27.0 - BS 4142: 2014 Assessment – Daytime Assessment - Typical Worst-Case – Kinvaid

Page 323

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |33
Daytime Assessment – Absolute Worst-Case – Kinvaid
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  45 dBLAeq,1hour  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru, noise emissions from fixed
plant installations as well the
contribution of stock deliveries
and waste collections. Table
47.0 for determination of
specific sound level.  
Background Sound
Level
47 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the daytime
period. 
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
Impulsivity:
Just Perceptible 
+3 dB  9.2 The sound of waste collections
can be impulsive in nature.
However, the presence of 1.8m
barrier and the substantial
physical distance between the
activities and the receptor mean
that the effect of impulsivity is
likely to be ‘just’ perceptible. 
No perceptible tones or
intermittency. 
Rating Level at
Receiver
48 dBA 9.1 
Excess of rating
level over
background level
(48 – 47) = +1 dBA  11 
Impact The Assessment
indicates that
adverse impact is not
likely, depending on
context
11 The excess of rating level over
background sound level is 
+1dBA, which is 4dBA level of
difference that indicates
likelihood of adverse impact,
depending on context
Table 28.0 - BS 4142: 2014 Assessment – Daytime Assessment – Absolute Worst-Case – Kinvaid

Page 324

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |34
Night-time Assessment – Kinvaid
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  39 dBLAeq,15min  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru as well as noise emissions
from fixed plant installations.
Table 48.0 for determination of
specific sound level.  
Background Sound
Level
22 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the night-time
period. 
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
Impulsivity:
Just Perceptible
+3 dB  9.2 The sound of car doors closing is
impulsive in nature and the
background sound level is lower
during this period, meaning that
it is likely to be more noticeable
than during the daytime period.
However, it is predicted that
there will be far fewer instances
of doors being slammed relative
to the reference period.
Therefore, the effect of
impulsivity is considered likely
to be ‘just’ perceptible. 
No perceptible tones or
intermittency. 
Rating Level at
Receiver
42 dBA 9.1 
Excess of rating
level over
background level
(42 – 22) = +20 dBA  11 
Impact The Assessment
indicates that
significant adverse
impact is likely,
depending on
context
11 The excess of rating level over
background sound level is
+20dBA, which is 10dBA above
the level of difference that
indicates likelihood of adverse
impact, depending on context
Table 29.0 - BS 4142: 2014 Assessment – Night-time Assessment – Kinvaid

Page 325

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |35
Daytime Assessment – Typical Worst-Case – Proposed Dwelling 1
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  43 dBLAeq,1hour  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru as well as noise emissions
from fixed plant installations.
Table 46.0 for determination of
specific sound level. 
Background Sound
Level
47 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the daytime
period.  
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
0 dB 9.2 No perceptible tones,
intermittency or impulsivity.  
Rating Level at
Receiver
47 dBA 9.1 
Excess of rating
level over
background level
(43 – 47) = -4 dBA  11 
Impact The Assessment
indicates that
adverse impact is not
likely, depending on
context
11 The excess of rating level over
background sound level is 
-4dBA, which is 9dBA below the
level of difference that
indicates likelihood of adverse
impact, depending on context
Table 30.0 - BS 4142: 2014 Assessment – Daytime Assessment - Typical Worst-Case – Proposed
Dwelling 1

Page 326

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |36
Daytime Assessment – Absolute Worst-Case – Proposed Dwelling 1
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  48 dBLAeq,1hour  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru, noise emissions from fixed
plant installations as well the
contribution of stock deliveries
and waste collections. Table
47.0 for determination of
specific sound level.  
Background Sound
Level
47 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the daytime
period. 
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
Impulsivity:
Just Perceptible 
+3 dB  9.2 The sound of waste collections
can be impulsive in nature.
However, the presence of 1.8m
barrier and the substantial
physical distance between the
activities and the receptor mean
that the effect of impulsivity is
likely to be ‘just’ perceptible. 
No perceptible tones or
intermittency. 
Rating Level at
Receiver
51 dBA 9.1 
Excess of rating
level over
background level
(51 – 47) = +4 dBA  11 
Impact The Assessment
indicates that
adverse impact is not
likely, depending on
context
11 The excess of rating level over
background sound level is 
+4dBA, which is 1dBA below the
level of difference that
indicates likelihood of adverse
impact, depending on context
Table 31.0 - BS 4142: 2014 Assessment – Daytime Assessment – Absolute Worst-Case – Proposed
Dwelling 1

Page 327

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |37
Night-time Assessment – Proposed Dwelling 1
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  43 dBLAeq,15min  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru as well as noise emissions
from fixed plant installations.
Table 48.0 for determination of
specific sound level.  
Background Sound
Level
22 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the night-time
period. 
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
Impulsivity:
Just Perceptible
+3 dB  9.2 The sound of car doors closing is
impulsive in nature and the
background sound level is lower
during this period, meaning that
it is likely to be more noticeable
than during the daytime period.
However, it is predicted that
there will be far fewer instances
of doors being slammed relative
to the reference period.
Therefore, the effect of
impulsivity is considered likely
to be ‘just’ perceptible. 
No perceptible tones or
intermittency. 
Rating Level at
Receiver
46 dBA 9.1 
Excess of rating
level over
background level
(46 – 22) = +24 dBA  11 
Impact The Assessment
indicates that
significant adverse
impact is likely,
depending on
context
11 The excess of rating level over
background sound level is
+24dBA, which is 10dBA above
the level of difference that
indicates likelihood of adverse
impact, depending on context
Table 32.0 - BS 4142: 2014 Assessment – Night-time Assessment – Proposed Dwelling 1

Page 328

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |38
Daytime Assessment – Typical Worst-Case – Proposed Dwelling 2
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  48 dBLAeq,1hour  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru as well as noise emissions
from fixed plant installations.
Table 46.0 for determination of
specific sound level. 
Background Sound
Level
47 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the daytime
period.  
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
0 dB 9.2 No perceptible tones,
intermittency or impulsivity.  
Rating Level at
Receiver
48 dBA 9.1 
Excess of rating
level over
background level
(48 – 47) = +1 dBA  11 
Impact The Assessment
indicates that
adverse impact is not
likely, depending on
context
11 The excess of rating level over
background sound level is 
+1dBA, which is 4dBA below the
level of difference that
indicates likelihood of adverse
impact, depending on context
Table 33.0 - BS 4142: 2014 Assessment – Daytime Assessment - Typical Worst-Case – Proposed
Dwelling 2

Page 329

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |39
Daytime Assessment – Absolute Worst-Case – Proposed Dwelling 2
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  53 dBLAeq,1hour  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru, noise emissions from fixed
plant installations as well the
contribution of stock deliveries
and waste collections. Table
47.0 for determination of
specific sound level.  
Background Sound
Level
47 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the daytime
period. 
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
Impulsivity:
Just Perceptible 
+3 dB  9.2 The sound of waste collections
can be impulsive in nature.
However, the presence of 1.8m
barrier and the substantial
physical distance between the
activities and the receptor mean
that the effect of impulsivity is
likely to be ‘just’ perceptible. 
No perceptible tones or
intermittency. 
Rating Level at
Receiver
56 dBA 9.1 
Excess of rating
level over
background level
(56 – 47) = +9 dBA  11 
Impact The Assessment
indicates that
adverse impact is
likely, depending on
context
11 The excess of rating level over
background sound level is 
+9dBA, which is 4dBA above the
level of difference that
indicates likelihood of adverse
impact, depending on context
Table 34.0 - BS 4142: 2014 Assessment – Daytime Assessment – Absolute Worst-Case – Proposed
Dwelling 2

Page 330

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |40
Night-time Assessment – Proposed Dwelling 2
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  46 dBLAeq,15min  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru as well as noise emissions
from fixed plant installations.
Table 48.0 for determination of
specific sound level.  
Background Sound
Level
22 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the night-time
period. 
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
Impulsivity:
Just Perceptible
+3 dB  9.2 The sound of car doors closing is
impulsive in nature and the
background sound level is lower
during this period, meaning that
it is likely to be more noticeable
than during the daytime period.
However, it is predicted that
there will be far fewer instances
of doors being slammed relative
to the reference period.
Therefore, the effect of
impulsivity is considered likely
to be ‘just’ perceptible. 
No perceptible tones or
intermittency. 
Rating Level at
Receiver
49 dBA 9.1 
Excess of rating
level over
background level
(49 – 22) = +27 dBA  11 
Impact The Assessment
indicates that
significant adverse
impact is likely,
depending on
context
11 The excess of rating level over
background sound level is
+27dBA, which is 17dBA above
the level of difference that
indicates likelihood of
significant adverse impact,
depending on context
Table 35.0 - BS 4142: 2014 Assessment – Night-time Assessment – Proposed Dwelling 2

Page 331

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |41
Daytime Assessment – Typical Worst-Case – Proposed Dwelling 3
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  49 dBLAeq,1hour  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru as well as noise emissions
from fixed plant installations.
Table 46.0 for determination of
specific sound level. 
Background Sound
Level
47 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the daytime
period.  
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
0 dB 9.2 No perceptible tones,
intermittency or impulsivity.  
Rating Level at
Receiver
48 dBA 9.1 
Excess of rating
level over
background level
(49 – 47) = +2 dBA  11 
Impact The Assessment
indicates that
adverse impact is not
likely, depending on
context
11 The excess of rating level over
background sound level is 
+2dBA, which is 3dBA below the
level of difference that
indicates likelihood of adverse
impact, depending on context
Table 36.0 - BS 4142: 2014 Assessment – Daytime Assessment - Typical Worst-Case – Proposed
Dwelling 3

Page 332

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |42
Daytime Assessment – Absolute Worst-Case – Proposed Dwelling 3
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  55 dBLAeq,1hour  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru, noise emissions from fixed
plant installations as well the
contribution of stock deliveries
and waste collections. Table
47.0 for determination of
specific sound level.  
Background Sound
Level
47 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the daytime
period. 
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
Impulsivity:
Just Perceptible 
+3 dB  9.2 The sound of waste collections
can be impulsive in nature.
However, the presence of 1.8m
barrier and the substantial
physical distance between the
activities and the receptor mean
that the effect of impulsivity is
likely to be ‘just’ perceptible. 
No perceptible tones or
intermittency. 
Rating Level at
Receiver
58 dBA 9.1 
Excess of rating
level over
background level
(58 – 47) = +11 dBA  11 
Impact The Assessment
indicates that
significant adverse
impact is likely,
depending on
context
11 The excess of rating level over
background sound level is 
+11dBA, which is 1dBA above
the level of difference that
indicates likelihood of
significant adverse impact,
depending on context
Table 37.0 - BS 4142: 2014 Assessment – Daytime Assessment – Absolute Worst-Case – Proposed
Dwelling 3

Page 333

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |43
Night-time Assessment – Proposed Dwelling 3
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  48 dBLAeq,15min  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru as well as noise emissions
from fixed plant installations.
Table 48.0 for determination of
specific sound level.  
Background Sound
Level
22 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the night-time
period. 
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
Impulsivity:
Just Perceptible
+3 dB  9.2 The sound of car doors closing is
impulsive in nature and the
background sound level is lower
during this period, meaning that
it is likely to be more noticeable
than during the daytime period.
However, it is predicted that
there will be far fewer instances
of doors being slammed relative
to the reference period.
Therefore, the effect of
impulsivity is considered likely
to be ‘just’ perceptible. 
No perceptible tones or
intermittency. 
Rating Level at
Receiver
51 dBA 9.1 
Excess of rating
level over
background level
(51 – 22) = +29 dBA  11 
Impact The Assessment
indicates that
significant adverse
impact is likely,
depending on
context
11 The excess of rating level over
background sound level is
+29dBA, which is 19dBA above
the level of difference that
indicates likelihood of
significant adverse impact,
depending on context
Table 38.0 - BS 4142: 2014 Assessment – Night-time Assessment – Proposed Dwelling 3

Page 334

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |44
Daytime Assessment – Typical Worst-Case – Proposed Dwelling 4
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  48 dBLAeq,1hour  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru as well as noise emissions
from fixed plant installations.
Table 46.0 for determination of
specific sound level. 
Background Sound
Level
47 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the daytime
period.  
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
0 dB 9.2 No perceptible tones,
intermittency or impulsivity.  
Rating Level at
Receiver
48 dBA 9.1 
Excess of rating
level over
background level
(48 – 47) = +1 dBA  11 
Impact The Assessment
indicates that
adverse impact is not
likely, depending on
context
11 The excess of rating level over
background sound level is 
+1dBA, which is 4dBA below the
level of difference that
indicates likelihood of adverse
impact, depending on context
Table 39.0 - BS 4142: 2014 Assessment – Daytime Assessment - Typical Worst-Case – Proposed
Dwelling 4

Page 335

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |45
Daytime Assessment – Absolute Worst-Case – Proposed Dwelling 4
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  54 dBLAeq,1hour  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru, noise emissions from fixed
plant installations as well the
contribution of stock deliveries
and waste collections. Table
47.0 for determination of
specific sound level.  
Background Sound
Level
47 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the daytime
period. 
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
Impulsivity:
Just Perceptible 
+3 dB  9.2 The sound of waste collections
can be impulsive in nature.
However, the presence of 1.8m
barrier and the substantial
physical distance between the
activities and the receptor mean
that the effect of impulsivity is
likely to be ‘just’ perceptible. 
No perceptible tones or
intermittency. 
Rating Level at
Receiver
58 dBA 9.1 
Excess of rating
level over
background level
(57 – 47) = +10 dBA  11 
Impact The Assessment
indicates that
significant adverse
impact is likely,
depending on
context
11 The excess of rating level over
background sound level is 
+10dBA, which is the level of
difference that indicates
likelihood of significant adverse
impact, depending on context
Table 40.0 - BS 4142: 2014 Assessment – Daytime Assessment – Absolute Worst-Case – Proposed
Dwelling 4

Page 336

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |46
Night-time Assessment – Proposed Dwelling 4
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  47 dBLAeq,15min  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru as well as noise emissions
from fixed plant installations.
Table 48.0 for determination of
specific sound level.  
Background Sound
Level
22 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the night-time
period. 
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
Impulsivity:
Just Perceptible
+3 dB  9.2 The sound of car doors closing is
impulsive in nature and the
background sound level is lower
during this period, meaning that
it is likely to be more noticeable
than during the daytime period.
However, it is predicted that
there will be far fewer instances
of doors being slammed relative
to the reference period.
Therefore, the effect of
impulsivity is considered likely
to be ‘just’ perceptible. 
No perceptible tones or
intermittency. 
Rating Level at
Receiver
50 dBA 9.1 
Excess of rating
level over
background level
(50 – 22) = +28 dBA  11 
Impact The Assessment
indicates that
significant adverse
impact is likely,
depending on
context
11 The excess of rating level over
background sound level is
+28dBA, which is 18dBA above
the level of difference that
indicates likelihood of
significant adverse impact,
depending on context
Table 41.0 - BS 4142: 2014 Assessment – Night-time Assessment – Proposed Dwelling 4

Page 337

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |47
Daytime Assessment – Typical Worst-Case – Proposed Dwelling 5
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  49 dBLAeq,1hour  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru as well as noise emissions
from fixed plant installations.
Table 46.0 for determination of
specific sound level. 
Background Sound
Level
47 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the daytime
period.  
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
0 dB 9.2 No perceptible tones,
intermittency or impulsivity.  
Rating Level at
Receiver
49 dBA 9.1 
Excess of rating
level over
background level
(49 – 47) = +2 dBA  11 
Impact The Assessment
indicates that
adverse impact is not
likely, depending on
context
11 The excess of rating level over
background sound level is 
+2dBA, which is 3dBA below the
level of difference that
indicates likelihood of adverse
impact, depending on context
Table 42.0 - BS 4142: 2014 Assessment – Daytime Assessment - Typical Worst-Case – Proposed
Dwelling 5

Page 338

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |48
Daytime Assessment – Absolute Worst-Case – Proposed Dwelling 5
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  53 dBLAeq,1hour  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru, noise emissions from fixed
plant installations as well the
contribution of stock deliveries
and waste collections. Table
47.0 for determination of
specific sound level.  
Background Sound
Level
47 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the daytime
period. 
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
Impulsivity:
Just Perceptible 
+3 dB  9.2 The sound of waste collections
can be impulsive in nature.
However, the presence of 1.8m
barrier and the substantial
physical distance between the
activities and the receptor mean
that the effect of impulsivity is
likely to be ‘just’ perceptible. 
No perceptible tones or
intermittency. 
Rating Level at
Receiver
56 dBA 9.1 
Excess of rating
level over
background level
(56 – 47) = +9 dBA  11 
Impact The Assessment
indicates that
adverse impact is
likely, depending on
context
11 The excess of rating level over
background sound level is 
+9dBA, which is 4dBA above the
level of difference that
indicates likelihood of adverse
impact, depending on context
Table 43.0 - BS 4142: 2014 Assessment – Daytime Assessment – Absolute Worst-Case – Proposed
Dwelling 5

Page 339

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |49
Night-time Assessment – Proposed Dwelling 5
Assessment  Relevant
Clause 
Commentary
Specific Sound Level  47 dBLAeq,15min  Calculated based on predicted
vehicle movements from the
associated car park and drive-
thru as well as noise emissions
from fixed plant installations.
Table 48.0 for determination of
specific sound level.  
Background Sound
Level
22 dBLA90,15min 8.1.1
8.1.2
8.1.3
8.1.4
8.2
8.6
The statistically most-repeated
LA90,15min value for the night-time
period. 
Barrier Attenuation 0 dBA  Barrier Attenuation already
applied in tables for each source
Acoustic Character
Correction: 
Impulsivity:
Just Perceptible
+3 dB  9.2 The sound of car doors closing is
impulsive in nature and the
background sound level is lower
during this period, meaning that
it is likely to be more noticeable
than during the daytime period.
However, it is predicted that
there will be far fewer instances
of doors being slammed relative
to the reference period.
Therefore, the effect of
impulsivity is considered likely
to be ‘just’ perceptible. 
No perceptible tones or
intermittency. 
Rating Level at
Receiver
50 dBA 9.1 
Excess of rating
level over
background level
(50 – 22) = +28 dBA  11 
Impact The Assessment
indicates that
significant adverse
impact is likely,
depending on
context
11 The excess of rating level over
background sound level is
+28dBA, which is 18dBA above
the level of difference that
indicates likelihood of
significant adverse impact,
depending on context
Table 44.0 - BS 4142: 2014 Assessment – Night-time Assessment – Proposed Dwelling 5

Page 340

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |50
6.2 Discussion
6.2.1 Overview 
The assessment of adverse impact at the noise sensitive receptors considered to be the worst
affected has been employed by the measured sound levels from the environmental noise survey.
The measurement and subsequent assessment have been carried out in accordance with
methodology outlined in BS 4142:2014. BS 4142 requires that human response to activity sound is
rated via numerical values as well as careful consideration for the context in which the sound exists. 
The assessments of the typical worst-case 1-hour daytime periods indicate that adverse impact is
not likely, subject to context. 
The assessments of the absolute worst-case 1-hour daytime period indicate that adverse impact is
likely at Proposed Dwelling 2, subject to context. 
The assessments of the absolute worst-case 1-hour daytime period indicate that significant adverse
impact is likely at Proposed Dwellings 3, 4 and 5, subject to context. Although it is unlikely that
waste collections will commonly take place during the period where the carpark and drive-thru are
at their busiest, arrangements should be made to ensure that waste collections do not take place
during periods where the carpark and drive-thru are at their busiest, if possible. 
The night-time assessments indicate that significant adverse impact is likely. The excess of the
specific sound level over the background sound level is substantial and therefore, contextual
considerations do not alter the assessment outcome. 
6.2.2 Context 
It is stated in section 11 of BS 4142: 2014 that “where the initial estimate of the impact needs to
be modified due to context, take all pertinent factors into consideration, including the following.” 
1) The character and level of the residual sound compared to the character and level of the
specific sound. Considering that the specific sound will exist within proximity of a main road
and a retail park, it is reasonable to expect that the nearby residents would expect an
acoustic climate which includes noise from vehicle movements. The sound of vehicle
movements, which is the greatest source of noise impact associated with the proposed
restaurant is likely to be masked by road traffic noise and is not distinguishable from the
residual sound environment. Noise associated with fixed plant installations is unlikely to
contain impulsive elements and is not likely to be readily distinguished considering the
steady residual environment which is dominated by road traffic noise during the daytime
period. 
2) The sensitivity of the receptor and whether the dwellings will already incorporate design
measures that secure good internal and/or another acoustic conditions, such as: 
i) Façade insulation treatment. The attenuation provided by the façade treatment at the
receptors should ensure that the rating levels from the assessments should be well below
the internal ambient noise level criteria of BS 8233:2014 during the daytime period. It is
likely that windows at the existing noise-sensitive receptors comprise secondary glazing.
Additionally, secondary glazing is also likely to be installed at the approved new
dwellings. Typically, even the most basic double-glazing systems provide at least 24dB
of attenuation when closed.

Page 341

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |51
ii) Ventilation and/or cooling that will reduce the need to have windows open. It should be
considered that BS 8233:2014 suggests that 15dB of attenuation can be achieved with a
partially opened window. This amount of attenuation should ensure that the rating level
itself should fall below the internal ambient noise level criteria of BS 8233:2014 during
the typical worst-case period daytime period with the window partially open.  It is also
considered likely, based on the Road Traffic Sound report issued by Charlie Fleming
Associates for Westpark, Blairgowrie, that alternative ventilation in the form of trickle
vents is to be installed at the approved new dwellings, which should reduce the need to
have open windows. 
6.2.3 Rating Level Assessment 
BS 4142 requires the assessment of acoustic features. Considering that the specific sound is
currently not present, feature corrections have been applied based on observations which were
made when taking sound measurements which would be used for the specific sound, as well as
information gathered from an existing McDonald’s restaurant. The sound of car engines from
vehicles using the associated carpark and drive-thru facility is likely to be masked by road traffic
from the surrounding road networks. Engine noise generally does not contain tonal elements and is
not impulsive in nature. Subsequently, no rating penalty has been applied for the vehicle
movements during the daytime period. 
External mechanical plant may contain tonal elements. However, the cumulative noise level from
the plant is below the background sound level during the daytime. Additionally, if the restaurant is
closed during the night-time period, fewer items of plant will be running during this period.
Therefore, it is considered that tones are unlikely to be perceptible. 
The sound of waste being dumped into the back of a wagon from a height as well as bin lids slamming
is impulsive in nature, however, due to the physical distance to the receptors, the presence of
barriers as well as refuse collections only taking place for a fraction of the 1-hour reference period,
the impact of impulsivity from the loading and unloading of goods is not considered ‘just’
perceptible against the background. Subsequently, a 3dB penalty for impulsivity has been applied. 
The sources associated with the McDonald’s restaurant do not contain perceivable on/off
characteristics and therefore, no penalty has been applied for intermittency. The noise sources
from the site also do not possess other characteristics that are particularly discernible from the
residual noise environment.

Page 342

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |52
6.2.4 On-time Impact 
BS 4142:2014 uses a reference period of 1-hour during the daytime and 15-minutes assess the
likelihood of adverse impact. The activities within these periods are required to be typical of the
operation under investigation both in terms of level and duration. This identifies whether the sounds
associated with the activity have the likelihood of adverse impact, depending on context. The
proportion of time the activity takes place within extended periods of time greater than the one-
hour reference period provides part of the acoustic context that the BS 4142:2014 assessment is
subject to. 
This assessment assumes that the McDonald’s restaurant will operate 24/7. While this is unlikely to
be the case, there will be periods where the site will be busier, as predicted by the transport
assessment of vehicle arrivals. The assessment has been based on the likely worst-case 1-hour
daytime period, as well as the worst-case 15-minute night-time period. It is therefore considered
that the assessment accurately represents the impact of site activity during the busiest 1-hour
period and the worst-case 15-minute night-time period, therefore the noise environment will be
improved during all other time periods.
It should be considered the assessment of the absolute worst-case includes waste collections. These
collections usually occur fewer than three times a week and therefore, do not represent the level
of impact over the wider period. 
6.2.5 Uncertainty 
Reasonable steps have been undertaken to reduce uncertainty in both measurement and assessment
in line with section 10 of BS 4142:2014. These steps include the use of class 1 instrumentation,
measurements being taken in suitable weather conditions, the measurement locations chosen to
obtain background sound levels being representative of the assessment locations and the number
of measurements taken. Considering that the assessment has been carried out for a proposed site,
uncertainty has been reduced by taking measurements of a comparable car park with the same road
surface, as well as observations made of a similar existing McDonald’s restaurant.  Uncertainty has
been reduced by the inclusion of considered and supported contextual issues, as they provide a
greater understanding of the residual acoustic environment and the level of variability in sound
emission from the source.

Page 343

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |53
7 Assessment of Impacts 
The significance of sound of a commercial nature depends upon both the margin by which the rating
level of the specific sound source exceeds the background sound level and the context in which the
sound occurs. An effective assessment cannot be conducted without an understanding of the
reason(s) for the assessment and the context in which the sound occurs/will occur. When making
assessments and arriving at decisions, therefore, it is essential to place the sound in context. An
initial estimate of the impact of the specific sound is made by subtracting the background level. 
a) Typically, the greater this difference, the greater the magnitude of the impact. 
b) A difference of around +10 dB or more is likely to be an indication of a significant adverse
impact, depending on the context. 
c) A difference of around +5 dB is likely to be an indication of an adverse impact, depending
on the context. 
d) The lower the rating level is relative to the measured background sound level, the less likely
it is that the specific sound source will have an adverse impact or a significant adverse
impact. Where the rating level does not exceed the background sound level, this is an
indication of the specific sound having a low impact, depending on the context. 
Based on the above, the assessment indicates that adverse impact is not likely to occur during the
typical worst-case daytime period at any of the noise sensitive receptors. The contextual
considerations such as the noise from vehicle movements blending into the residual environment
and the closest receptors incorporating acoustic design measures means that the level of impact is
likely to be lower than indicated by the initial assessment. 
The assessment of the absolute worst-case daytime period at the noise sensitive receptors indicates
that adverse effect is not likely at Lodge, Ardlui, Langdale, Kinvaid and proposed dwelling 1. The
contextual considerations such as the noise from vehicle movements blending into the residual
environment and the closest receptors incorporating acoustic design measures means that the level
of impact is likely to be lower than indicated by the initial assessment. 
The assessment of the absolute worst-case daytime period at the noise sensitive receptors indicates
that adverse effect is likely at proposed dwelling 2. The contextual considerations such as the noise
from vehicle movements blending into the residual environment and the closest receptors
incorporating acoustic design measures means that the level of impact is likely to be lower than
indicated by the initial assessment. 
The assessment of the absolute worst-case daytime period at the noise sensitive receptors indicates
that significant adverse effect is likely at proposed dwellings 3, 4 and 5. Considering that the rating
sound level is only just above the level difference that indicates likelihood of significant adverse
impact at all three receptors, close consideration should be given to contextual factors. The
contextual considerations such as the noise from vehicle movements blending into the residual
environment and the closest receptors incorporating acoustic design measures means that the level
of impact is likely to be lower than indicated by the initial assessment. It should also be noted that
the dominant sound source driving the up the specific sound level is from waste collections. Waste
collections occur sparingly, meaning that this assessment is not a representation of typical site
operation. Additionally, waste collections are likely to be required regardless of the development
that would be built on the plot of land.

Page 344

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |54
8 Night-time Plant Noise Impact Assessment
It is understood that if the restaurant is closed during night-time hours, the HVAC and kitchen
extract will not run apart from until an hour after closure when the crew are cleaning up. The
following table shows the predicted sound pressure level from all other items of plant running
simultaneously at Lodge. 
Plan
Reference
Plant Item  dBA 
@1m
dB
LWA
Distance
to NSR
(m)
Propagation Screening 
Correction
A-weighted
SPL @ NSR
S2/C1 Mitsubishi
ZRP200
(Heating)
62 - 39 - -10 21
S2/C2 Mitsubishi
ZRP200
(Heating)
62 - 39 -  -10 21
S1/C1 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 21
S1/C2 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 21
S1/C3 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 21
AC/02 Mitsubishi
M50FA
- 51 47 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 -
AC/03 Mitsubishi
PUZ-ZM71VHA
- 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 17
EF/02 EF/02 - 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 15
EF/03 EF/03 - 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 16
HWS fRY013pI - 59 41 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 8
A-weighted total (dB) 
(All plant running simultaneously) 
29
Table 45.0 – Noise Emissions from Proposed Mechanical Plant Installations – Lodge (Night-time)

Page 345

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |55
Plan
Reference
Plant Item  dBA 
@1m
dB
LWA
Distance
to NSR
(m)
Propagation Screening 
Correction
A-weighted
SPL @ NSR
S2/C1 Mitsubishi
ZRP200
(Heating)
62 - 39 - -10 21
S2/C2 Mitsubishi
ZRP200
(Heating)
62 - 39 -  -10 21
S1/C1 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 21
S1/C2 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 21
S1/C3 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 21
AC/02 Mitsubishi
M50FA
- 51 47 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 -
AC/03 Mitsubishi
PUZ-ZM71VHA
- 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 18
EF/02 EF/02 - 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 15
EF/03 EF/03 - 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 16
HWS fRY013pI - 59 41 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 9
A-weighted total (dB) 
(All plant running simultaneously) 
29
Table 46.0 – Noise Emissions from Proposed Mechanical Plant Installations – Ardlui (Night-time)

Page 346

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |56
Plan
Reference
Plant Item  dBA 
@1m
dB
LWA
Distance
to NSR
(m)
Propagation Screening 
Correction
A-weighted
SPL @ NSR
S2/C1 Mitsubishi
ZRP200
(Heating)
62 - 39 - -10 20
S2/C2 Mitsubishi
ZRP200
(Heating)
62 - 39 -  -10 20
S1/C1 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 20
S1/C2 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 20
S1/C3 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 20
AC/02 Mitsubishi
M50FA
- 51 47 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 -
AC/03 Mitsubishi
PUZ-ZM71VHA
- 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 17
EF/02 EF/02 - 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 16
EF/03 EF/03 - 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 17
HWS fRY013pI - 59 41 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 9
A-weighted total (dB) 
(All plant running simultaneously) 
28
Table 47.0 – Noise Emissions from Proposed Mechanical Plant Installations – Langdale (Night-time)

Page 347

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |57
Plan
Reference
Plant Item  dBA 
@1m
dB
LWA
Distance
to NSR
(m)
Propagation Screening 
Correction
A-weighted
SPL @ NSR
S2/C1 Mitsubishi
ZRP200
(Heating)
62 - 39 - -10 18
S2/C2 Mitsubishi
ZRP200
(Heating)
62 - 39 -  -10 18
S1/C1 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 18
S1/C2 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 18
S1/C3 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 18
AC/02 Mitsubishi
M50FA
- 51 47 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 -
AC/03 Mitsubishi
PUZ-ZM71VHA
- 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 15
EF/02 EF/02 - 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 15
EF/03 EF/03 - 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 16
HWS fRY013pI - 59 41 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 8
A-weighted total (dB) 
(All plant running simultaneously) 
26
Table 48.0 – Noise Emissions from Proposed Mechanical Plant Installations – Kinvaid (Night-time)

Page 348

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |58
Plan
Reference
Plant Item  dBA 
@1m
dB
LWA
Distance
to NSR
(m)
Propagation Screening 
Correction
A-weighted
SPL @ NSR
S2/C1 Mitsubishi
ZRP200
(Heating)
62 - 57 - -10 17
S2/C2 Mitsubishi
ZRP200
(Heating)
62 - 57 -  -10 17
S1/C1 Mitsubishi
ZRP250
(Heating)
62 - 63 -  -10 16
S1/C2 Mitsubishi
ZRP250
(Heating)
62 - 63 -  -10 16
S1/C3 Mitsubishi
ZRP250
(Heating)
62 - 63 -  -10 16
AC/02 Mitsubishi
M50FA
- 51 59 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 -
AC/03 Mitsubishi
PUZ-ZM71VHA
- 67 57 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 14
EF/02 EF/02 - 67 57 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 13
EF/03 EF/03 - 67 52 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 15
HWS fRY013pI - 59 52 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 7
A-weighted total (dB) 
(All plant running simultaneously) 
25
Table 49.0 – Noise Emissions from Proposed Mechanical Plant Installations – Proposed Dwelling 1
(Night-time)

Page 349

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |59
Plan
Reference
Plant Item  dBA 
@1m
dB
LWA
Distance
to NSR
(m)
Propagation Screening 
Correction
A-weighted
SPL @ NSR
S2/C1 Mitsubishi
ZRP200
(Heating)
62 - 37 - -10 20
S2/C2 Mitsubishi
ZRP200
(Heating)
62 - 36 -  -10 21
S1/C1 Mitsubishi
ZRP250
(Heating)
62 - 40 -  -10 20
S1/C2 Mitsubishi
ZRP250
(Heating)
62 - 39 -  -10 20
S1/C3 Mitsubishi
ZRP250
(Heating)
62 - 39 -  -10 20
AC/02 Mitsubishi
M50FA
- 51 28 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 4
AC/03 Mitsubishi
PUZ-ZM71VHA
- 67 30 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 19
EF/02 EF/02 - 67 27 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 19
EF/03 EF/03 - 67 21 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 23
HWS fRY013pI - 59 21 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 15
A-weighted total (dB) 
(All plant running simultaneously) 
30
Table 50.0 – Noise Emissions from Proposed Mechanical Plant Installations – Proposed Dwelling 2
(Night-time)

Page 350

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |60
Plan
Reference
Plant Item  dBA 
@1m
dB
LWA
Distance
to NSR
(m)
Propagation Screening 
Correction
A-weighted
SPL @ NSR
S2/C1 Mitsubishi
ZRP200
(Heating)
62 - 36 - -10 21
S2/C2 Mitsubishi
ZRP200
(Heating)
62 - 36 -  -10 21
S1/C1 Mitsubishi
ZRP250
(Heating)
62 - 36 -  -10 21
S1/C2 Mitsubishi
ZRP250
(Heating)
62 - 35 -  -10 21
S1/C3 Mitsubishi
ZRP250
(Heating)
62 - 34 -  -10 21
AC/02 Mitsubishi
M50FA
- 51 23 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 6
AC/03 Mitsubishi
PUZ-ZM71VHA
- 67 24 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 21
EF/02 EF/02 - 67 22 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 21
EF/03 EF/03 - 67 18 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 24
HWS fRY013pI - 59 18 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 16
A-weighted total (dB) 
(All plant running simultaneously) 
31
Table 51.0 – Noise Emissions from Proposed Mechanical Plant Installations – Proposed Dwelling 3
(Night-time)

Page 351

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |61
Plan
Reference
Plant Item  dBA 
@1m
dB
LWA
Distance
to NSR
(m)
Propagation Screening 
Correction
A-weighted
SPL @ NSR
S2/C1 Mitsubishi
ZRP200
(Heating)
62 - 36 - -10 21
S2/C2 Mitsubishi
ZRP200
(Heating)
62 - 35 -  -10 21
S1/C1 Mitsubishi
ZRP250
(Heating)
62 - 38 -  -10 21
S1/C2 Mitsubishi
ZRP250
(Heating)
62 - 37 -  -10 21
S1/C3 Mitsubishi
ZRP250
(Heating)
62 - 36 -  -10 21
AC/02 Mitsubishi
M50FA
- 51 27 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 4
AC/03 Mitsubishi
PUZ-ZM71VHA
- 67 25 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 21
EF/02 EF/02 - 67 24 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 20
EF/03 EF/03 - 67 18 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 24
HWS fRY013pI - 59 18 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 16
A-weighted total (dB) 
(All plant running simultaneously) 
31
Table 52.0 – Noise Emissions from Proposed Mechanical Plant Installations – Proposed Dwelling 4
(Night-time)

Page 352

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |62
Plan
Reference
Plant Item  dBA 
@1m
dB
LWA
Distance
to NSR
(m)
Propagation Screening 
Correction
A-weighted
SPL @ NSR
S2/C1 Mitsubishi
ZRP200
(Heating)
62 - 35 - -10 21
S2/C2 Mitsubishi
ZRP200
(Heating)
62 - 35 -  -10 21
S1/C1 Mitsubishi
ZRP250
(Heating)
62 - 36 -  -10 21
S1/C2 Mitsubishi
ZRP250
(Heating)
62 - 35 -  -10 21
S1/C3 Mitsubishi
ZRP250
(Heating)
62 - 34 -  -10 21
AC/02 Mitsubishi
M50FA
- 51 23 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 6
AC/03 Mitsubishi
PUZ-ZM71VHA
- 67 24 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 21
EF/02 EF/02 - 67 22 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 21
EF/03 EF/03 - 67 16 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 25
HWS fRY013pI - 59 16 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 17
A-weighted total (dB) 
(All plant running simultaneously) 
31
Table 53.0 – Noise Emissions from Proposed Mechanical Plant Installations – Proposed Dwelling 5
(Night-time) 
Tables 45.0 – 53.0 predict that during the night-time hours, the plant noise level will be 8dB – 11dB
greater than the prevailing background sound level depending on the noise-sensitive receptor. An
initial noise impact assessment would suggest that adverse or significant adverse impact would be
likely, subject to context. However, the plant noise level outside of all of the receptors is predicted
to be below 30dB, which is the Indoor ambient noise level target for dwellings. Considering that
15dB of attenuation (BS 8233:2014) can be achieved with a partially open window, the plant noise
level inside the dwellings is likely to be well below the indoor ambient noise level target with a
partially open window. As stated in section 6.2.2 of this report, the approved new dwellings are
also likely to incorporate alternative ventilation, which should reduce the need for the windows to
be open. If windows at the dwellings were to be closed, the plant noise level would be even further
below the indoor ambient noise level.

Page 353

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |63
9 Conclusions
A sound survey was undertaken to inform the assessment of the likelihood of adverse impact from
the proposed McDonald’s restaurant with associated car park and drive-thru facility Westpark Retail
Park, off Perth Road, Blairgowrie. The sound survey was carried out in compliance with BS 4142 as
detailed in this report. The sound survey considers the impacts at nine noise-sensitive receptors
including four existing receptors on the opposite side of Perth Road to the site, Lodge, Ardlui,
Langdale and Kinvaid. The other five receptors are approved future dwellings that are to built
immediately to the north of the site.
Sound measurements were taken at one location representing the most exposed noise-sensitive
receptors. Noise measurements were taken from other sites to represent noise sources that will be
associated with the proposed site, such as car park vehicle movements and deliveries. Sound levels
associated with noise sources such as mechanical plant and refuse collections have been established
from British Standards and Manufacturer datasheets. 
The initial assessment of the typical worst-case daytime period indicates that adverse impact is not
likely at any of the nearby noise-sensitive receptors. The contextual considerations required by BS
4142, particularly the nature of the source within the residual environment and acoustic design
measures being incorporated at the most-exposed noise-sensitive receptors suggest that the impact
is likely to be lower than predicted by the initial BS 4142 assessment. 
The initial assessment of the absolute worst-case daytime period, where waste collections are
taking place in the same one-hour period as when the car park and drive-thru are at their busiest
indicates that adverse impact is not likely at Lodge, Ardlui, Langdale, Kinvaid and proposed dwelling
1. The contextual considerations required by BS 4142, particularly the nature of the source within
the residual environment and acoustic design measures being incorporated at the most-exposed
noise-sensitive receptors suggest that the impact is likely to be lower than predicted by the initial
BS 4142 assessment. 
The initial assessment of the absolute worst-case daytime period, where waste collections are
taking place in the same one-hour period as when the car park and drive-thru are at their busiest
indicates that adverse impact is likely at proposed dwelling 2. The contextual considerations
required by BS 4142, particularly the nature of the source within the residual environment and
acoustic design measures being incorporated at the most-exposed noise-sensitive receptors suggest
that the impact is likely to be lower than predicted by the initial BS 4142 assessment. 
The initial assessment of the absolute worst-case daytime period predicts that significant adverse
impact is likely at Proposed Dwellings 3, 4 and 5. Considering that the rating sound level is only just
above the level difference that indicates likelihood of significant adverse impact at all three
receptors, close consideration should be given to contextual factors. The contextual considerations
required by BS 4142, particularly the nature of the source within the residual environment and
acoustic design measures being incorporated at the most-exposed noise-sensitive receptors suggest
that the impact is likely to be lower than predicted by the initial BS 4142 assessment. Additionally,
waste collections which are likely to be required regardless of the development that would be built
on the plot, occur sparingly, meaning that this assessment is not a representation of typical site
operation. 
The initial assessment of the worst-case night-time period when the restaurant is open and the
carpark and drive-thru are in use indicates that significant adverse impact is likely. The difference
between the specific sound level and the background sound level is substantial, meaning that there
is a high degree of confidence and uncertainty is diminished, and the relevance of contextual
considerations in this instance is reduced.

Page 354

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |64
It is recommended that the proposed 1.1m surrounding the drive-thru lane be upgraded to an
acoustic fence with a minimum height of 1.8m. The fence should have a minimum mass of 10kg/m2
and not have holes or gaps present. 
Some items of fixed mechanical plant are to continue running if the facility stops trading during the
night-time period. Although the calculations suggest that the cumulative plant noise level will
exceed the prevailing background sound level by 8dB – 11dB, which indicates adverse or significant
adverse impact, plant noise levels inside are still expected to comply with the internal ambient
noise level outlined in BS 8233:2014 in all of the receptors considering that the attenuation that
can be achieved with a partially open window should result in plant noise level that is well below
the indoor ambient noise level target for the night-time inside a bedroom. If windows were at the
dwellings were to be closed the plant noise level would fall even further below the internal ambient
noise level target as specified in BS 8233:2014 inside the bedrooms, as a standard double glazing
system typically provides at least 24 dB of attenuation. 
This Report has been prepared by: 
Encon Associates Limited
10 Chapel Lane
Arnold
Nottingham
NG5 7DR
Tel: 0115 987 55 99
Email: ben@enconassociates.com 
Signed for and on behalf of Encon Associates Limited 
Ben Phipps BSc (Hons), AMIOA
Acoustic Consultant
Date:  1st August 2025

Page 355

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |65
Appendix A – Acoustic Terminology & Definitions
Sound Pressure The fluctuations in air pressure, from the steady atmospheric pressure, created
by sound, measured in pascals (Pa).
Sound Pressure
Level (SPL)
The sound pressure measured on a decibel scale relative to a standard
reference pressure of 20μPa (20x10-6 Pascals).
Decibel (dB) A scale for comparing the ratios of two quantities, including sound pressure
and sound power. The difference in level between two sounds s1 and s2 is given
by 20 log10 ( s1 / s2 ). The decibel can also be used to measure absolute
quantities by specifying a reference value that fixes one point on the scale. For
sound pressure, the reference value is 20μPa.
Frequency (Hz) The pitch of the sound, measured in Herts (Hz)
Integrating Sound
Level Meter
An instrument used for measuring sound levels with the capacity to perform
calculations to derive other parameters. 
Calibration A check of the function of a sound level meter by comparing the meter reading
with a known sound pressure level. This is performed in the field before and
after measurement and by a laboratory every year calibrators and every two
years for Sound Level Meters.
A-Weighting, dB(A) A frequency waiting devised to attempt to take the fact that human response
to sound is not equally sensitive at all frequencies into account. 
Z-Weighting A zero frequency weighting (often referred to as unweighted).
Attenuation Noise reduction, measured in decibels.
Ambient Sound
Level LAeq.T
The total encompassing sound in a given situation, at a given time. Usually
composed of sounds from many sources, near and far.
Residual Sound
Level LAeq.T
The ambient sound remaining when the specific sound source is suppressed to
a degree it does not contribute to the ambient sound. 
Specific Sound Level
LAeq.T
The equivalent continuous A-weighted sound pressure level produced by the
specific sound source at the assessment location over a given reference time
interval, Tr.
Rating Level LAr, tr The specific sound level plus any adjustment for the characteristic features of
the sound.
Background Sound
Level LA90.T
A-weighted sound pressure level that is exceeded by the residual sound at the
assessment location for 90% of a given time interval, T, measured using time
weighting F and quoted to the nearest whole number of decibels.
Sound Exposure
Level , SEL (LAE)
A measure of A-weighted sound energy used to describe noise events such as
the passing of trains; it is the A-weighted sound pressure level which, is
occurring over a period of one second, would contain the same amount of A-
weighted sound energy as the event.
Frequency Analysis Analysis of a sound into its frequency components. Commonly 1/1 or 1/3 octave
bands
Frequency Spectrum A graph resulting from frequency analysis and showing different levels of the
signal in the various frequency bands.
Octave-bands A division of the frequency range into bands, the upper frequency limit of
each  band being twice the lower frequency limit. 
Noise Index A method of evaluating or rating a noise, usually by assigning a single number
to it, based on some combination of its physical parameters (sound pressure
level, frequency, duration) and other factors such as time of day, tonal
characteristics and impulsive characteristics. 
Leq, T Otherwise referred to as the ‘continuous equivalent noise level’ of a period of
time (T). This is the steady noise level which contains the same amount of
energy as the time varying sound level that was recorded. 
Lmax,T The maximum RMS sound pressure level that occurs within a specified time
period. It is used often to describe occasional loud noise events that may have
little influence on the Leq but will have an effect on the overall acoustic
environment. The time weighting (Fast or Slow) is usually specified.

Page 356

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |66
L90, T The noise level exceeded for 90% of the specified time period (T). It is often
used to characterise the background noise. 
L10, T The noise level exceeded for 10% of the specified time period (T). It is often
used to characterise road traffic noise. 
Free-Field A situation where the radiation from a sound source is completely unaffected
by the presence of reflective surfaces. In terms of environmental noise
measurement, it is usually taken to mean at least 3.5m away from 3.5m away
from reflective surfaces with the exception of the ground. 
Façade Noise Level A noise level measured within 3m of a building façade, which contains a
contribution arising from reflection of sound at the façade. The difference
between the façade level and free-field level is described as the façade
correction factor. 
Noise Sensitive
Receptor
Premises that are used for purposes sensitive to noise and that require
protection. 
Line Source A source of sound that as distance increases away from the source it still
appears large in one dimension. Attenuation of this form of source occurs at a
distance of (a/𝜋) where a is the largest dimension of the source.
Point Source A source of sound that as distance increases away from the source it appears
as a point in space.  Attenuation of this form of source occurs at a distance of
(b/𝜋) where b is the smallest dimension of the source.
Time Weighting One of the standard averaging times (Fast, Slow or Impulsive) used for the
measurement of RMS sound pressure level in sound level meters, specified in
ISO 61671-1. 
Rw Single number quantity which characterises the airborne the airborne sound
insulation of a material or building element over a range of frequencies, based
on laboratory measurements. 
DnT,w + Ctr A single value that characterises the airborne sound insulation performance
using the Ctr: spectrum adaption terms described in BS EN ISO 717-1. The value
is based on field measurements and the value represents total sound
transmission including flanking sound, not just the partition. 
The table below presents an indication of sound levels associated with the environment starting
from 0dB (the threshold of hearing) to 140dB (The threshold of pain). 
Sound Level Location/Activity 
0 dB(A) Threshold of Hearing
20 – 30 dB(A) Inside Quiet Bedroom at Night
30 – 40 dB(A) Inside a Living Room During the Day
40 – 50 dB(A) Inside Typical Office
50 – 60 dB(A) Inside a Car
60 – 70 dB(A) Typical High Street
70 – 90 dB(A) Inside Factory 
100 – 110 dB(A) Burglar Alarm at 1m
110 – 130 dB(A) Jet Aircraft on Take Off
140 dB(A) Threshold of Pain 
The ‘A’ denotes the A-weighting scale used to replicate the frequency response of the human ear.

Page 357

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |67
Appendix B – Carpark and Drive-Thru Vehicle Movement Noise
Emissions Tables
Proposed Carpark Noise Emissions at Lodge – Daytime 
Source Measurement
Distance 
(m)
Receptor
Distance
(m)
Screening 
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
1hour
Car Pulling into
Car Park
5 74 0 52 77 35
Car Passage  3 83 -10 44 77 17
Drive Thru –
drive off street
and stop at COD
5 82 -10 51 77 24
Engine Idling –
Making Order
1 63 -10 57 77 30
Drive to Pay
Point
5 51 -10 55 77 28
Engine Idling –
Pay Point
5 42 -10 58 77 31
Drive to
Collection Point
5 36 -10 59 77 32
Engine Idling -
Collection Point
5 34 -10 59 77 33
Car Pulling off
Collection Point 
5 28 -10 66 77 39
Car Pulling off
Drive-Thru into
Car Park
5 49 -10 61 77 34
Car Passage  3 61 -10 47 77 20
Car Driving off
and pulling onto
the street
8 74 -10 53 77 26
Car Passage  3 83 0 44 57 26
Car Passage  3 65 -10 46 57 18
Car Passage  3 54 -10 48 57 20
Car Passage  3 61 -10 47 57 19
Car Driving off
and pulling onto
the street
8 73 0 53 57 35
Car Reversing  7 83 -10 45 19 12
Car Reversing  7 65 -10 47 19 14

Page 358

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |68
Car Reversing  7 54 -10 48 19 15
Car Pulling off
Parking Space
4 83 -10 44 19 11
Car Pulling off
Parking Space
4 65 -10 46 19 13
Car Pulling off
Parking Space
4 54 -10 47 19 15
Car Engine
Starting 
5 83 -10 44 6 6
Car Engine
Starting 
5 65 -10 46 6 8
Car Engine
Starting 
5 54 -10 47 7 10
Car Door Slam  1 83 -10 52 38 22
Car Door Slam  1 65 -10 54 38 24
Car Door Slam  1 54 -10 55 38 26
Total dBLAeq, 1hour  44 
Proposed Carpark Noise Emissions at Lodge - Night-time 
Source Measurement
Distance 
(m)
Receptor
Distance
(m)
Screening 
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
15min
Car Pulling into
Car Park
5 74 0 52 4 28
Car Passage  3 83 0 44 4 21
Drive Thru –
drive off street
and stop at COD
5 82 -10 51 4 17
Engine Idling –
Making Order
1 63 -10 57 4 23
Drive to Pay
Point
5 51 -10 55 4 21
Engine Idling –
Pay Point
5 42 -10 58 4 24
Drive to
Collection Point
5 36 -10 59 4 25
Engine Idling -
Collection Point
5 34 -10 59 4 26
Car Pulling off
Collection Point 
5 28 -10 66 4 33

Page 359

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |69
Car Pulling off
Drive-Thru into
Car Park
5 49 -10 61 4 28
Car Passage  3 61 -10 47 4 13
Car Driving off
and pulling onto
the street
8 74 0 53 4 29
Car Passage  3 83 -10 44 6 12
Car Passage  3 65 -10 46 6 15
Car Passage  3 54 -10 48 6 16
Car Passage  3 61 -10 47 6 15
Car Driving off
and pulling onto
the street
8 73 0 53 6 31
Car Reversing  7 83 -10 45 3 10
Car Reversing  7 65 -10 47 3 12
Car Reversing  7 54 -10 48 3 13
Car Pulling off
Parking Space
4 83 -10 44 3 9
Car Pulling off
Parking Space
4 65 -10 46 3 11
Car Pulling off
Parking Space
4 54 -10 47 3 13
Car Engine
Starting 
5 83 -10 44 2 7
Car Engine
Starting 
5 65 -10 46 2 9
Car Engine
Starting 
5 54 -10 47 2 11
Car Door Slam  1 83 -10 52 4 18
Car Door Slam  1 65 -10 54 4 20
Car Door Slam  1 54 -10 55 4 22
Total dBLAeq, 15min  39

Page 360

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |70
Proposed Carpark Noise Emissions at Ardlui – Daytime 
Source Measurement
Distance 
(m)
Receptor
Distance
(m)
Screening 
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
1hour
Car Pulling into
Car Park
5 78 0 51 77 34
Car Passage  3 85 -10 44 77 17
Drive Thru –
drive off street
and stop at COD
5 79 -10 51 77 24
Engine Idling –
Making Order
1 58 -10 58 77 31
Drive to Pay
Point
5 43 -10 56 77 30
Engine Idling –
Pay Point
5 34 -10 59 77 33
Drive to
Collection Point
5 33 -10 60 77 33
Engine Idling -
Collection Point
5 31 -10 60 77 33
Car Pulling off
Collection Point 
5 29 -10 66 77 39
Car Pulling off
Drive-Thru into
Car Park
5 52 -10 61 77 34
Car Passage  3 64 -10 46 77 20
Car Driving off
and pulling onto
the street
8 78 0 52 77 36
Car Passage  3 85 -10 44 57 16
Car Passage  3 64 -10 46 57 18
Car Passage  3 54 -10 48 57 20
Car Passage  3 64 -10 46 57 18
Car Driving off
and pulling onto
the street
8 78 0 52 57 34
Car Reversing  7 84 -10 44 19 12
Car Reversing  7 54 -10 48 19 15
Car Reversing  7 64 -10 47 19 14

Page 361

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |71
Car Pulling off
Parking Space
4 84 -10 44 19 11
Car Pulling off
Parking Space
4 54 -10 47 19 15
Car Pulling off
Parking Space
4 64 -10 46 19 13
Car Engine
Starting 
5 84 -10 43 6 6
Car Engine
Starting 
5 54 -10 47 6 10
Car Engine
Starting 
5 64 -10 46 7 9
Car Door Slam  1 84 -10 52 38 22
Car Door Slam  1 54 -10 55 38 26
Car Door Slam  1 64 -10 54 38 24
Total dBLAeq, 1hour  45 
Proposed Carpark Noise Emissions at Ardlui - Night-time 
Source Measurement
Distance 
(m)
Receptor
Distance
(m)
Screening 
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
15min
Car Pulling into
Car Park
5 78 0 52 4 28
Car Passage  3 85 -10 44 4 10
Drive Thru –
drive off street
and stop at COD
5 79 -10 51 4 18
Engine Idling –
Making Order
1 58 -10 57 4 24
Drive to Pay
Point
5 43 -10 55 4 23
Engine Idling –
Pay Point
5 34 -10 58 4 26
Drive to
Collection Point
5 33 -10 59 4 26
Engine Idling -
Collection Point
5 31 -10 59 4 27
Car Pulling off
Collection Point 
5 29 -10 66 4 32

Page 362

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |72
Car Pulling off
Drive-Thru into
Car Park
5 52 -10 61 4 27
Car Passage  3 64 -10 47 4 13
Car Driving off
and pulling onto
the street
8 78 0 53 4 29
Car Passage  3 85 -10 44 6 12
Car Passage  3 64 -10 46 6 15
Car Passage  3 54 -10 48 6 16
Car Passage  3 64 -10 47 6 15
Car Driving off
and pulling onto
the street
8 78 0 53 6 30
Car Reversing  7 84 -10 45 3 10
Car Reversing  7 54 -10 47 3 13
Car Reversing  7 64 -10 48 3 12
Car Pulling off
Parking Space
4 84 -10 44 3 9
Car Pulling off
Parking Space
4 54 -10 46 3 13
Car Pulling off
Parking Space
4 64 -10 47 3 11
Car Engine
Starting 
5 84 -10 44 2 7
Car Engine
Starting 
5 54 -10 46 2 11
Car Engine
Starting 
5 64 -10 47 2 9
Car Door Slam  1 84 -10 52 4 18
Car Door Slam  1 54 -10 54 4 22
Car Door Slam  1 64 -10 55 4 20
Total dBLAeq, 15min  38

Page 363

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |73
Proposed Carpark Noise Emissions at Langdale – Daytime 
Source Measurement
Distance 
(m)
Receptor
Distance
(m)
Screening 
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
1hour
Car Pulling into
Car Park
5 97 -10 49 77 23
Car Passage  3 90 -10 43 77 17
Drive Thru –
drive off street
and stop at COD
5 80 -10 51 77 24
Engine Idling –
Making Order
1 60 -10 57 77 31
Drive to Pay
Point
5 43 -10 56 77 30
Engine Idling –
Pay Point
5 35 -10 59 77 32
Drive to
Collection Point
5 35 -10 59 77 32
Engine Idling -
Collection Point
5 35 -10 59 77 32
Car Pulling off
Collection Point 
5 37 -10 64 77 37
Car Pulling off
Drive-Thru into
Car Park
5 59 -10 60 77 33
Car Passage  3 70 -10 46 77 19
Car Driving off
and pulling onto
the street
8 87 -10 51 77 25
Car Passage  3 90 -10 43 57 15
Car Passage  3 67 -10 46 57 18
Car Passage  3 58 -10 47 57 19
Car Passage  3 70 -10 46 57 18
Car Driving off
and pulling onto
the street
8 97 -10 50 57 22
Car Reversing  7 65 -10 47 19 14
Car Reversing  7 67 -10 46 19 14
Car Reversing  7 70 -10 46 19 13

Page 364

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |74
Car Pulling off
Parking Space
4 65 -10 46 19 13
Car Pulling off
Parking Space
4 67 -10 46 19 13
Car Pulling off
Parking Space
4 70 -10 45 19 12
Car Engine
Starting 
5 65 -10 46 6 8
Car Engine
Starting 
5 67 -10 45 6 8
Car Engine
Starting 
5 70 -10 45 7 8
Car Door Slam  1 65 -10 54 38 24
Car Door Slam  1 67 -10 53 38 24
Car Door Slam  1 70 -10 53 38 23
Total dBLAeq, 1hour  42 
Proposed Carpark Noise Emissions at Langdale - Night-time 
Source Measurement
Distance 
(m)
Receptor
Distance
(m)
Screening 
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
15min
Car Pulling into
Car Park
5 97 -10 49 4 16
Car Passage  3 90 -10 43 4 10
Drive Thru –
drive off street
and stop at COD
5 80 -10 51 4 17
Engine Idling –
Making Order
1 60 -10 57 4 24
Drive to Pay
Point
5 43 -10 56 4 23
Engine Idling –
Pay Point
5 35 -10 59 4 26
Drive to
Collection Point
5 35 -10 59 4 26
Engine Idling -
Collection Point
5 35 -10 59 4 26
Car Pulling off
Collection Point 
5 37 -10 64 4 30

Page 365

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |75
Car Pulling off
Drive-Thru into
Car Park
5 59 -10 60 4 26
Car Passage  3 70 -10 46 4 12
Car Driving off
and pulling onto
the street
8 87 -10 51 4 18
Car Passage  3 90 -10 43 6 12
Car Passage  3 67 -10 46 6 14
Car Passage  3 58 -10 47 6 16
Car Passage  3 70 -10 46 6 14
Car Driving off
and pulling onto
the street
8 97 -10 50 6 19
Car Reversing  7 65 -10 47 3 12
Car Reversing  7 67 -10 46 3 12
Car Reversing  7 70 -10 46 3 11
Car Pulling off
Parking Space
4 65 -10 46 3 11
Car Pulling off
Parking Space
4 67 -10 46 3 11
Car Pulling off
Parking Space
4 70 -10 45 3 10
Car Engine
Starting 
5 65 -10 46 2 9
Car Engine
Starting 
5 67 -10 45 2 9
Car Engine
Starting 
5 70 -10 45 2 9
Car Door Slam  1 65 -10 54 4 20
Car Door Slam  1 67 -10 53 4 20
Car Door Slam  1 70 -10 53 4 20
Total dBLAeq, 15min  36

Page 366

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |76
Proposed Carpark Noise Emissions at Kinvaid – Daytime 
Source Measurement
Distance 
(m)
Receptor
Distance
(m)
Screening 
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
1hour
Car Pulling into
Car Park
5 106 -10 48 77 22
Car Passage  3 96 -10 43 77 16
Drive Thru –
drive off street
and stop at COD
5 82 -10 51 77 24
Engine Idling –
Making Order
1 61 -10 57 77 31
Drive to Pay
Point
5 43 -10 56 77 30
Engine Idling –
Pay Point
5 40 -10 58 77 31
Drive to
Collection Point
5 40 -10 58 77 31
Engine Idling -
Collection Point
5 44 -10 57 77 30
Car Pulling off
Collection Point 
5 47 -10 62 77 35
Car Pulling off
Drive-Thru into
Car Park
5 68 -10 58 77 32
Car Passage  3 78 -10 45 77 18
Car Driving off
and pulling onto
the street
8 106 -10 50 77 23
Car Passage  3 96 -10 43 57 15
Car Passage  3 71 -10 46 57 18
Car Passage  3 66 -10 46 57 18
Car Passage  3 78 -10 45 57 17
Car Driving off
and pulling onto
the street
8 106 -10 50 57 22
Car Reversing  7 96 -10 43 19 10
Car Reversing  7 71 -10 46 19 13
Car Reversing  7 78 -10 45 19 12

Page 367

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |77
Car Pulling off
Parking Space
4 96 -10 42 19 10
Car Pulling off
Parking Space
4 71 -10 45 19 12
Car Pulling off
Parking Space
4 78 -10 44 19 11
Car Engine
Starting 
5 96 -10 42 6 5
Car Engine
Starting 
5 71 -10 45 6 7
Car Engine
Starting 
5 78 -10 44 7 7
Car Door Slam  1 96 -10 50 38 21
Car Door Slam  1 71 -10 53 38 23
Car Door Slam  1 78 -10 52 38 22
Total dBLAeq, 1hour  41 
Proposed Carpark Noise Emissions at Kinvaid - Night-time 
Source Measurement
Distance 
(m)
Receptor
Distance
(m)
Screening 
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
15min
Car Pulling into
Car Park
5 106 -10 49 4 15
Car Passage  3 96 -10 43 4 9
Drive Thru –
drive off street
and stop at COD
5 82 -10 51 4 17
Engine Idling –
Making Order
1 61 -10 57 4 24
Drive to Pay
Point
5 43 -10 56 4 23
Engine Idling –
Pay Point
5 40 -10 59 4 24
Drive to
Collection Point
5 40 -10 59 4 24
Engine Idling -
Collection Point
5 44 -10 59 4 24
Car Pulling off
Collection Point 
5 47 -10 64 4 28

Page 368

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |78
Car Pulling off
Drive-Thru into
Car Park
5 68 -10 60 4 25
Car Passage  3 78 -10 46 4 11
Car Driving off
and pulling onto
the street
8 106 -10 51 4 16
Car Passage  3 96 -10 43 6 11
Car Passage  3 71 -10 46 6 14
Car Passage  3 66 -10 47 6 14
Car Passage  3 78 -10 46 6 13
Car Driving off
and pulling onto
the street
8 106 -10 50 6 18
Car Reversing  7 96 -10 47 3 8
Car Reversing  7 71 -10 46 3 11
Car Reversing  7 78 -10 46 3 10
Car Pulling off
Parking Space
4 96 -10 46 3 8
Car Pulling off
Parking Space
4 71 -10 46 3 4
Car Pulling off
Parking Space
4 78 -10 45 3 9
Car Engine
Starting 
5 96 -10 46 2 6
Car Engine
Starting 
5 71 -10 45 2 8
Car Engine
Starting 
5 78 -10 45 2 8
Car Door Slam  1 96 -10 54 4 17
Car Door Slam  1 71 -10 53 4 19
Car Door Slam  1 78 -10 53 4 19
Total dBLAeq, 15min  34

Page 369

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |79
Proposed Carpark Noise Emissions at Proposed Dwelling 1 - Daytime 
Source Measurement
Distance 
(m)
Receptor
Distance
(m)
Screening 
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
1hour
Car Pulling into
Car Park
5 43 -10 46 77 30
Car Passage  3 26 -10 44 77 28
Drive Thru –
drive off street
and stop at COD
5 18 -10 54 77 37
Engine Idling –
Making Order
1 37 -10 52 77 35
Drive to Pay
Point
5 42 -10 47 77 30
Engine Idling –
Pay Point
5 68 -10 43 77 27
Drive to
Collection Point
5 69 -10 43 77 27
Engine Idling -
Collection Point
5 69 -10 43 77 27
Car Pulling off
Collection Point 
5 69 -10 48 77 32
Car Pulling off
Drive-Thru into
Car Park
5 60 -10 49 77 33
Car Passage  3 46 -10 39 77 23
Car Driving off
and pulling onto
the street
8 43 -10 47 77 31
Car Passage  3 26 -10 44 57 26
Car Passage  3 35 -10 42 57 24
Car Passage  3 51 -10 38 57 20
Car Passage  3 46 -10 39 57 21
Car Driving off
and pulling onto
the street
8 43 -10 47 57 29
Car Reversing  7 26 -10 45 19 22
Car Reversing  7 35 -10 42 19 19
Car Reversing  7 51 -10 39 19 16

Page 370

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |80
Car Pulling off
Parking Space
4 26 -10 44 19 21
Car Pulling off
Parking Space
4 35 -10 41 19 18
Car Pulling off
Parking Space
4 51 -10 38 19 15
Car Engine
Starting 
5 26 -10 44 6 16
Car Engine
Starting 
5 35 -10 41 6 13
Car Engine
Starting 
5 51 -10 38 7 11
Car Door Slam  1 26 -10 52 38 32
Car Door Slam  1 35 -10 49 38 29
Car Door Slam  1 51 -10 46 38 26
Total dBLAeq, 1hour  43 
Proposed Carpark Noise Emissions at Proposed Dwelling 1 - Night-time 
Source Measurement
Distance 
(m)
Receptor
Distance
(m)
Screening 
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
15min
Car Pulling into
Car Park
5 43 -5 51 4 28
Car Passage  3 26 -5 49 4 26
Drive Thru –
drive off street
and stop at COD
5 18 -5 59 4 35
Engine Idling –
Making Order
1 37 -5 57 4 33
Drive to Pay
Point
5 42 -5 52 4 28
Engine Idling –
Pay Point
5 68 -5 48 4 25
Drive to
Collection Point
5 69 -5 48 4 25
Engine Idling -
Collection Point
5 69 -5 48 4 25
Car Pulling off
Collection Point 
5 69 -5 53 4 30

Page 371

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |81
Car Pulling off
Drive-Thru into
Car Park
5 60 -5 54 4 31
Car Passage  3 46 -5 44 4 21
Car Driving off
and pulling onto
the street
8 43 -5 52 4 29
Car Passage  3 26 -5 49 6 27
Car Passage  3 35 -5 47 6 25
Car Passage  3 51 -5 43 6 22
Car Passage  3 46 -5 44 6 23
Car Driving off
and pulling onto
the street
8 43 -5 52 6 31
Car Reversing  7 26 -5 50 3 25
Car Reversing  7 35 -5 47 3 22
Car Reversing  7 51 -5 44 3 19
Car Pulling off
Parking Space
4 26 -5 49 3 24
Car Pulling off
Parking Space
4 35 -5 46 3 21
Car Pulling off
Parking Space
4 51 -5 43 3 18
Car Engine
Starting 
5 26 -5 49 2 22
Car Engine
Starting 
5 35 -5 46 2 20
Car Engine
Starting 
5 51 -5 43 2 16
Car Door Slam  1 26 -5 57 4 33
Car Door Slam  1 35 -5 54 4 31
Car Door Slam  1 51 -5 51 4 27
Total dBLAeq, 15min  43

Page 372

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |82
Proposed Carpark Noise Emissions at Proposed Dwelling 2 - Daytime 
Source Measurement
Distance 
(m)
Receptor
Distance
(m)
Screening 
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
1hour
Car Pulling into
Car Park
5 57 -10 44 77 27
Car Passage  3 41 -10 40 77 24
Drive Thru –
drive off street
and stop at COD
5 14 -10 56 77 39
Engine Idling –
Making Order
1 13 -10 61 77 44
Drive to Pay
Point
5 18 -10 54 77 37
Engine Idling –
Pay Point
5 38 -10 48 77 32
Drive to
Collection Point
5 40 -10 48 77 31
Engine Idling -
Collection Point
5 45 -10 47 77 30
Car Pulling off
Collection Point 
5 45 -10 52 77 35
Car Pulling off
Drive-Thru into
Car Park
5 47 -10 52 77 35
Car Passage  3 42 -10 40 77 23
Car Driving off
and pulling onto
the street
8 57 -10 45 77 28
Car Passage  3 41 -10 40 57 22
Car Passage  3 26 -10 44 57 26
Car Passage  3 34 -10 42 57 24
Car Passage  3 42 -10 40 57 22
Car Driving off
and pulling onto
the street
8 57 -10 45 57 27
Car Reversing  7 26 -10 45 19 22
Car Reversing  7 34 -10 42 19 19
Car Reversing  7 42 -10 40 19 18

Page 373

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |83
Car Pulling off
Parking Space
4 26 -10 44 19 21
Car Pulling off
Parking Space
4 34 -10 41 19 19
Car Pulling off
Parking Space
4 42 -10 40 19 17
Car Engine
Starting 
5 26 -10 44 6 16
Car Engine
Starting 
5 34 -10 41 6 14
Car Engine
Starting 
5 42 -10 40 7 12
Car Door Slam  1 26 -10 52 38 32
Car Door Slam  1 34 -10 49 38 30
Car Door Slam  1 42 -10 48 38 28
Total dBLAeq, 1hour  47 
Proposed Carpark Noise Emissions at Proposed Dwelling 2 - Night-time 
Source Measurement
Distance 
(m)
Receptor
Distance
(m)
Screening 
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
15min
Car Pulling into
Car Park
5 57 -5 49 4 15
Car Passage  3 41 -5 45 4 9
Drive Thru –
drive off street
and stop at COD
5 14 -5 61 4 17
Engine Idling –
Making Order
1 13 -5 66 4 24
Drive to Pay
Point
5 18 -5 59 4 23
Engine Idling –
Pay Point
5 38 -5 53 4 24
Drive to
Collection Point
5 40 -5 53 4 24
Engine Idling -
Collection Point
5 45 -5 52 4 24
Car Pulling off
Collection Point 
5 45 -5 57 4 28

Page 374

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |84
Car Pulling off
Drive-Thru into
Car Park
5 47 -5 57 4 25
Car Passage  3 42 -5 45 4 11
Car Driving off
and pulling onto
the street
8 57 -5 50 4 16
Car Passage  3 41 -5 45 6 11
Car Passage  3 26 -5 49 6 14
Car Passage  3 34 -5 47 6 14
Car Passage  3 42 -5 45 6 13
Car Driving off
and pulling onto
the street
8 57 -5 50 6 18
Car Reversing  7 26 -5 50 3 8
Car Reversing  7 34 -5 47 3 11
Car Reversing  7 42 -5 45 3 10
Car Pulling off
Parking Space
4 26 -5 49 3 8
Car Pulling off
Parking Space
4 34 -5 46 3 4
Car Pulling off
Parking Space
4 42 -5 45 3 9
Car Engine
Starting 
5 26 -5 49 2 6
Car Engine
Starting 
5 34 -5 46 2 8
Car Engine
Starting 
5 42 -5 45 2 8
Car Door Slam  1 26 -5 57 4 17
Car Door Slam  1 34 -5 54 4 19
Car Door Slam  1 42 -5 53 4 19
Total dBLAeq, 15min  46

Page 375

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |85
Proposed Carpark Noise Emissions at Proposed Dwelling 3 - Daytime 
Source Measurement
Distance 
(m)
Receptor
Distance
(m)
Screening 
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
1hour
Car Pulling into
Car Park
5 68 -10 42 77 26
Car Passage  3 54 -10 38 77 21
Drive Thru –
drive off street
and stop at COD
5 25 -10 51 77 34
Engine Idling –
Making Order
1 17 -10 58 77 42
Drive to Pay
Point
5 8 -10 61 77 44
Engine Idling –
Pay Point
5 20 -10 54 77 37
Drive to
Collection Point
5 22 -10 53 77 36
Engine Idling -
Collection Point
5 34 -10 49 77 33
Car Pulling off
Collection Point 
5 28 -10 56 77 39
Car Pulling off
Drive-Thru into
Car Park
5 41 -10 53 77 36
Car Passage  3 46 -10 39 77 23
Car Driving off
and pulling onto
the street
8 74 -10 43 77 26
Car Passage  3 54 -10 38 57 20
Car Passage  3 31 -10 43 57 25
Car Passage  3 32 -10 42 57 24
Car Passage  3 46 -10 39 57 21
Car Driving off
and pulling onto
the street
8 64 -10 44 57 26
Car Reversing  7 54 -10 38 19 15
Car Reversing  7 31 -10 43 19 20
Car Reversing  7 46 -10 40 19 17

Page 376

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |86
Car Pulling off
Parking Space
4 54 -10 37 19 15
Car Pulling off
Parking Space
4 31 -10 42 19 19
Car Pulling off
Parking Space
4 46 -10 39 19 16
Car Engine
Starting 
5 54 -10 37 6 10
Car Engine
Starting 
5 31 -10 42 6 14
Car Engine
Starting 
5 46 -10 39 7 12
Car Door Slam  1 54 -10 45 38 26
Car Door Slam  1 31 -10 50 38 30
Car Door Slam  1 46 -10 47 38 27
Total dBLAeq, 1hour  49 
Proposed Carpark Noise Emissions at Proposed Dwelling 3 - Night-time 
Source Measurement
Distance 
(m)
Receptor
Distance
(m)
Screening 
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
15min
Car Pulling into
Car Park
5 68 -5 47 4 24
Car Passage  3 54 -5 43 4 19
Drive Thru –
drive off street
and stop at COD
5 25 -5 56 4 32
Engine Idling –
Making Order
1 17 -5 63 4 40
Drive to Pay
Point
5 8 -5 66 4 42
Engine Idling –
Pay Point
5 20 -5 59 4 35
Drive to
Collection Point
5 22 -5 58 4 35
Engine Idling -
Collection Point
5 34 -5 54 4 31
Car Pulling off
Collection Point 
5 28 -5 61 4 38

Page 377

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |87
Car Pulling off
Drive-Thru into
Car Park
5 41 -5 58 4 34
Car Passage  3 46 -5 44 4 21
Car Driving off
and pulling onto
the street
8 74 -5 48 4 24
Car Passage  3 54 -5 43 6 21
Car Passage  3 31 -5 48 6 26
Car Passage  3 32 -5 47 6 26
Car Passage  3 46 -5 44 6 23
Car Driving off
and pulling onto
the street
8 64 -5 49 6 27
Car Reversing  7 54 -5 43 3 18
Car Reversing  7 31 -5 48 3 23
Car Reversing  7 46 -5 45 3 20
Car Pulling off
Parking Space
4 54 -5 42 3 18
Car Pulling off
Parking Space
4 31 -5 47 3 22
Car Pulling off
Parking Space
4 46 -5 44 3 19
Car Engine
Starting 
5 54 -5 42 2 16
Car Engine
Starting 
5 31 -5 47 2 21
Car Engine
Starting 
5 46 -5 44 2 17
Car Door Slam  1 54 -5 50 4 27
Car Door Slam  1 31 -5 55 4 32
Car Door Slam  1 46 -5 52 4 28
Total dBLAeq, 15min  47

Page 378

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |88
Proposed Carpark Noise Emissions at Proposed Dwelling 4 - Daytime 
Source Measurement
Distance 
(m)
Receptor
Distance
(m)
Screening 
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
1hour
Car Pulling into
Car Park
5 53 -10 44 77 28
Car Passage  3 33 -10 42 77 25
Drive Thru –
drive off street
and stop at COD
5 19 -10 53 77 37
Engine Idling –
Making Order
1 13 -10 61 77 44
Drive to Pay
Point
5 14 -10 56 77 39
Engine Idling –
Pay Point
5 43 -10 47 77 31
Drive to
Collection Point
5 44 -10 47 77 30
Engine Idling -
Collection Point
5 46 -10 47 77 30
Car Pulling off
Collection Point 
5 47 -10 52 77 35
Car Pulling off
Drive-Thru into
Car Park
5 47 -10 52 77 35
Car Passage  3 41 -10 40 77 24
Car Driving off
and pulling onto
the street
8 53 -10 46 77 29
Car Passage  3 33 -10 42 57 24
Car Passage  3 24 -10 45 57 27
Car Passage  3 35 -10 42 57 24
Car Passage  3 41 -10 40 57 22
Car Driving off
and pulling onto
the street
8 53 -10 46 57 28
Car Reversing  7 33 -10 43 19 20
Car Reversing  7 24 -10 45 19 23
Car Reversing  7 41 -10 41 19 18

Page 379

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |89
Car Pulling off
Parking Space
4 33 -10 42 19 19
Car Pulling off
Parking Space
4 24 -10 44 19 22
Car Pulling off
Parking Space
4 41 -10 40 19 17
Car Engine
Starting 
5 33 -10 42 6 14
Car Engine
Starting 
5 24 -10 44 6 17
Car Engine
Starting 
5 41 -10 40 7 13
Car Door Slam  1 33 -10 50 38 30
Car Door Slam  1 24 -10 52 38 33
Car Door Slam  1 41 -10 48 38 28
Total dBLAeq, 1hour  47 
Proposed Carpark Noise Emissions at Proposed Dwelling 4 - Night-time 
Source Measurement
Distance 
(m)
Receptor
Distance
(m)
Screening 
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
15min
Car Pulling into
Car Park
5 53 -5 49 4 26
Car Passage  3 33 -5 47 4 24
Drive Thru –
drive off street
and stop at COD
5 19 -5 58 4 35
Engine Idling –
Making Order
1 13 -5 66 4 42
Drive to Pay
Point
5 14 -5 61 4 38
Engine Idling –
Pay Point
5 43 -5 52 4 29
Drive to
Collection Point
5 44 -5 52 4 29
Engine Idling -
Collection Point
5 46 -5 52 4 28
Car Pulling off
Collection Point 
5 47 -5 57 4 33

Page 380

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |90
Car Pulling off
Drive-Thru into
Car Park
5 47 -5 57 4 33
Car Passage  3 41 -5 45 4 22
Car Driving off
and pulling onto
the street
8 53 -5 51 4 27
Car Passage  3 33 -5 47 6 25
Car Passage  3 24 -5 50 6 28
Car Passage  3 35 -5 47 6 25
Car Passage  3 41 -5 45 6 24
Car Driving off
and pulling onto
the street
8 53 -5 51 6 29
Car Reversing  7 33 -5 48 3 23
Car Reversing  7 24 -5 50 3 26
Car Reversing  7 41 -5 46 3 21
Car Pulling off
Parking Space
4 33 -5 47 3 22
Car Pulling off
Parking Space
4 24 -5 49 3 25
Car Pulling off
Parking Space
4 41 -5 45 3 20
Car Engine
Starting 
5 33 -5 47 2 20
Car Engine
Starting 
5 24 -5 49 2 23
Car Engine
Starting 
5 41 -5 45 2 18
Car Door Slam  1 33 -5 55 4 31
Car Door Slam  1 24 -5 57 4 34
Car Door Slam  1 41 -5 53 4 29
Total dBLAeq, 15min  46

Page 381

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |91
Proposed Carpark Noise Emissions at Proposed Dwelling 5 - Daytime 
Source Measurement
Distance 
(m)
Receptor
Distance
(m)
Screening 
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
1hour
Car Pulling into
Car Park
5 56 -10 44 77 27
Car Passage  3 37 -10 41 77 24
Drive Thru –
drive off street
and stop at COD
5 20 -10 53 77 36
Engine Idling –
Making Order
1 12 -10 61 77 45
Drive to Pay
Point
5 14 -10 56 77 39
Engine Idling –
Pay Point
5 38 -10 48 77 32
Drive to
Collection Point
5 39 -10 48 77 31
Engine Idling -
Collection Point
5 43 -10 47 77 31
Car Pulling off
Collection Point 
5 43 -10 52 77 36
Car Pulling off
Drive-Thru into
Car Park
5 45 -10 52 77 35
Car Passage  3 42 -10 40 77 23
Car Driving off
and pulling onto
the street
8 56 -10 45 77 28
Car Passage  3 37 -10 41 57 23
Car Passage  3 25 -10 45 57 27
Car Passage  3 34 -10 42 57 24
Car Passage  3 42 -10 40 57 22
Car Driving off
and pulling onto
the street
8 56 -10 45 57 27
Car Reversing  7 37 -10 42 19 19
Car Reversing  7 25 -10 45 19 22
Car Reversing  7 42 -10 40 19 18

Page 382

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |92
Car Pulling off
Parking Space
4 37 -10 41 19 18
Car Pulling off
Parking Space
4 25 -10 44 19 21
Car Pulling off
Parking Space
4 42 -10 40 19 17
Car Engine
Starting 
5 37 -10 41 6 13
Car Engine
Starting 
5 25 -10 44 6 16
Car Engine
Starting 
5 42 -10 40 7 12
Car Door Slam  1 37 -10 49 38 29
Car Door Slam  1 25 -10 52 38 32
Car Door Slam  1 42 -10 48 38 28
Total dBLAeq, 1hour  48 
Proposed Carpark Noise Emissions at Proposed Dwelling 5 - Night-time 
Source Measurement
Distance 
(m)
Receptor
Distance
(m)
Screening 
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
15min
Car Pulling into
Car Park
5 56 -5 49 4 25
Car Passage  3 37 -5 47 4 23
Drive Thru –
drive off street
and stop at COD
5 20 -5 58 4 34
Engine Idling –
Making Order
1 12 -5 66 4 43
Drive to Pay
Point
5 14 -5 61 4 38
Engine Idling –
Pay Point
5 38 -5 52 4 30
Drive to
Collection Point
5 39 -5 52 4 30
Engine Idling -
Collection Point
5 43 -5 52 4 29
Car Pulling off
Collection Point 
5 56 -5 57 4 34

Page 383

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |93
Car Pulling off
Drive-Thru into
Car Park
5 43 -5 57 4 33
Car Passage  3 45 -5 45 4 22
Car Driving off
and pulling onto
the street
8 42 -5 51 4 27
Car Passage  3 56 -5 47 6 24
Car Passage  3 37 -5 50 6 28
Car Passage  3 25 -5 47 6 25
Car Passage  3 34 -5 45 6 23
Car Driving off
and pulling onto
the street
8 42 -5 51 6 28
Car Reversing  7 56 -5 48 3 22
Car Reversing  7 37 -5 50 3 25
Car Reversing  7 25 -5 46 3 21
Car Pulling off
Parking Space
4 42 -5 47 3 21
Car Pulling off
Parking Space
4 37 -5 49 3 24
Car Pulling off
Parking Space
4 25 -5 45 3 20
Car Engine
Starting 
5 42 -5 47 2 19
Car Engine
Starting 
5 37 -5 49 2 22
Car Engine
Starting 
5 25 -5 45 2 18
Car Door Slam  1 42 -5 55 4 30
Car Door Slam  1 37 -5 57 4 34
Car Door Slam  1 25 -5 53 4 29
Total dBLAeq, 15min  46

Page 384

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |94
Appendix C – Customer Order Display Noise Emission Tables 
Customer Order Display Noise Emissions at Lodge – Daytime 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of
Events
dB LAeq, 1hour
Customer
Order Display
0.5 63 -10 35 77 28
Total dBLAeq, 1hour  28 
Customer Order Display Noise Emissions at Ardlui – Daytime 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of
Events
dB LAeq, 1hour
Customer
Order Display
0.5 43 -10 38 77 31
Total dBLAeq, 1hour  31 
Customer Order Display Noise Emissions at Langdale – Daytime 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of
Events
dB LAeq, 1hour
Customer
Order Display
0.5 35 -10 40 77 33
Total dBLAeq, 1hour  33 
Customer Order Display Noise Emissions at Kinvaid – Daytime 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of
Events
dB LAeq, 1hour
Customer
Order Display
0.5 40 -10 39 77 32
Total dBLAeq, 1hour  32 
Customer Order Display Noise Emissions at Proposed Dwelling 1 – Daytime 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of
Events
dB LAeq, 1hour
Customer
Order Display
0.5 37 -10 40 77 23
Total dBLAeq, 1hour  23

Page 385

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |95
Customer Order Display Noise Emissions at Proposed Dwelling 2 – Daytime 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of
Events
dB LAeq, 1hour
Customer
Order Display
0.5 13 -10 49 77 32
Total dBLAeq, 1hour  32 
Customer Order Display Noise Emissions at Proposed Dwelling 3 – Daytime 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of
Events
dB LAeq, 1hour
Customer
Order Display
0.5 17 -10 46 77 30
Total dBLAeq, 1hour  30 
Customer Order Display Noise Emissions at Dwelling 4 – Daytime 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of
Events
dB LAeq, 1hour
Customer
Order Display
0.5 13 -10 49 77 32
Total dBLAeq, 1hour  32 
Customer Order Display Noise Emissions at Dwelling 5 – Daytime 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of
Events
dB LAeq, 1hour
Customer
Order Display
0.5 12 -10 49 77 33
Total dBLAeq, 1hour  33 
Customer Order Display Noise Emissions at Lodge – Night-time 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of
Events
dB LAeq, 15min
Customer
Order Display
0.5 63 -10 35 4 12
Total dBLAeq, 15-minute  12

Page 386

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |96
Customer Order Display Noise Emissions at Ardlui – Night-time 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of
Events
dB LAeq, 15min
Customer
Order Display
0.5 43 -10 38 4 15
Total dBLAeq, 15-minute  15 
Customer Order Display Noise Emissions at Langdale – Night-time 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of
Events
dB LAeq, 15min
Customer
Order Display
0.5 35 -10 40 4 17
Total dBLAeq, 15-minute  17 
Customer Order Display Noise Emissions at Kinvaid – Night-time 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of
Events
dB LAeq, 15min
Customer
Order Display
0.5 40 -10 39 4 16
Total dBLAeq, 15-minute  16 
Customer Order Display Noise Emissions at Proposed Dwelling 1 – Night-time 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of
Events
dB LAeq, 15min
Customer
Order Display
0.5 37 -5 45 4 21
Total dBLAeq, 15-minute  21 
Customer Order Display Noise Emissions at Proposed Dwelling 2 – Night-time 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of
Events
dB LAeq, 15min
Customer
Order Display
0.5 13 -5 54 4 30
Total dBLAeq, 15-minute  30

Page 387

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |97
Customer Order Display Noise Emissions at Proposed Dwelling 3 – Night-time 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of
Events
dB LAeq, 15min
Customer
Order Display
0.5 17 -5 51 4 28
Total dBLAeq, 15-minute  28 
Customer Order Display Noise Emissions at Proposed Dwelling 4 – Night-time 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of
Events
dB LAeq, 15min
Customer
Order Display
0.5 13 -5 54 4 30
Total dBLAeq, 15-minute  30 
Customer Order Display Noise Emissions at Proposed Dwelling 5 – Night-time 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of
Events
dB LAeq, 15min
Customer
Order Display
0.5 12 -5 54 4 31
Total dBLAeq, 15-minute  31

Page 388

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |98
Appendix D – Fixed Plant Installations Noise Emissions
Noise Emissions from Proposed Mechanical Plant Installations – Lodge 
Plan
Reference
Plant Item  dBA 
@1m
dB
LWA
Distance
to NSR
(m)
Propagation Screening 
Correction
A-weighted
SPL @ NSR
S2/C1 Mitsubishi
ZRP200
(Heating)
62 - 39 - -10 21
S2/C2 Mitsubishi
ZRP200
(Heating)
62 - 39 -  -10 21
S1/C1 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 21
S1/C2 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 21
S1/C3 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 21
EF/01 BW10
(Breakout
@1m)
67 - 41 -  -10 25
AC/02 Mitsubishi
M50FA
- 51 47 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 -
AC/03 Mitsubishi
PUZ-ZM71VHA
- 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 17
EF/02 EF/02 - 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 15
EF/03 EF/03 - 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 16
HWS fRY013pI - 59 41 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 8
S1 S1 (Supply Fan
Outlet in
Duct)
- 86 41 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 37
S2 S2 (Supply Fan
Outlet in
Duct)
- 79 41 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 31
A-weighted total (dB) 
(All plant running simultaneously) 
39

Page 389

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |99
Noise Emissions from Proposed Mechanical Plant Installations – Ardlui 
Plan
Reference
Plant Item  dBA 
@1m
dB
LWA
Distance
to NSR
(m)
Propagation Screening 
Correction
A-weighted
SPL @ NSR
S2/C1 Mitsubishi
ZRP200
(Heating)
62 - 39 - -10 21
S2/C2 Mitsubishi
ZRP200
(Heating)
62 - 39 -  -10 21
S1/C1 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 21
S1/C2 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 21
S1/C3 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 21
EF/01 BW10
(Breakout
@1m)
67 - 41 -  -10 26
AC/02 Mitsubishi
M50FA
- 51 47 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 -
AC/03 Mitsubishi
PUZ-ZM71VHA
- 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 18
EF/02 EF/02 - 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 15
EF/03 EF/03 - 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 16
HWS fRY013pI - 59 41 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 9
S1 S1 (Supply Fan
Outlet in
Duct)
- 86 41 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 37
S2 S2 (Supply Fan
Outlet in
Duct)
- 79 41 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 31
A-weighted total (dB) 
(All plant running simultaneously) 
39

Page 390

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |100
Noise Emissions from Proposed Mechanical Plant Installations – Langdale 
Plan
Reference
Plant Item  dBA 
@1m
dB
LWA
Distance
to NSR
(m)
Propagation Screening 
Correction
A-weighted
SPL @ NSR
S2/C1 Mitsubishi
ZRP200
(Heating)
62 - 39 - -10 20
S2/C2 Mitsubishi
ZRP200
(Heating)
62 - 39 -  -10 20
S1/C1 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 20
S1/C2 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 20
S1/C3 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 20
EF/01 BW10
(Breakout
@1m)
67 - 41 -  -10 25
AC/02 Mitsubishi
M50FA
- 51 47 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 -
AC/03 Mitsubishi
PUZ-ZM71VHA
- 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 17
EF/02 EF/02 - 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 16
EF/03 EF/03 - 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 17
HWS fRY013pI - 59 41 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 9
S1 S1 (Supply Fan
Outlet in
Duct)
- 86 41 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 36
S2 S2 (Supply Fan
Outlet in
Duct)
- 79 41 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 29
A-weighted total (dB) 
(All plant running simultaneously) 
37

Page 391

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |101
Noise Emissions from Proposed Mechanical Plant Installations – Kinvaid 
Plan
Reference
Plant Item  dBA 
@1m
dB
LWA
Distance
to NSR
(m)
Propagation Screening 
Correction
A-weighted
SPL @ NSR
S2/C1 Mitsubishi
ZRP200
(Heating)
62 - 39 - -10 18
S2/C2 Mitsubishi
ZRP200
(Heating)
62 - 39 -  -10 18
S1/C1 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 18
S1/C2 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 18
S1/C3 Mitsubishi
ZRP250
(Heating)
62 - 41 -  -10 18
EF/01 BW10
(Breakout
@1m)
67 - 41 -  -10 24
AC/02 Mitsubishi
M50FA
- 51 47 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 -
AC/03 Mitsubishi
PUZ-ZM71VHA
- 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 15
EF/02 EF/02 - 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 15
EF/03 EF/03 - 67 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 16
HWS fRY013pI - 59 41 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 8
S1 S1 (Supply Fan
Outlet in
Duct)
- 86 41 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 33
S2 S2 (Supply Fan
Outlet in
Duct)
- 79 41 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 27
A-weighted total (dB) 
(All plant running simultaneously) 
35

Page 392

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |102
Noise Emissions from Proposed Mechanical Plant Installations – Proposed Dwelling 1 
Plan
Reference
Plant Item  dBA 
@1m
dB
LWA
Distance
to NSR
(m)
Propagation Screening 
Correction
A-weighted
SPL @ NSR
S2/C1 Mitsubishi
ZRP200
(Heating)
62 - 57 - -10 17
S2/C2 Mitsubishi
ZRP200
(Heating)
62 - 57 -  -10 17
S1/C1 Mitsubishi
ZRP250
(Heating)
62 - 63 -  -10 16
S1/C2 Mitsubishi
ZRP250
(Heating)
62 - 63 -  -10 16
S1/C3 Mitsubishi
ZRP250
(Heating)
62 - 63 -  -10 16
EF/01 BW10
(Breakout
@1m)
67 - 54 -  -10 23
AC/02 Mitsubishi
M50FA
- 51 59 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 -
AC/03 Mitsubishi
PUZ-ZM71VHA
- 67 57 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 14
EF/02 EF/02 - 67 57 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 13
EF/03 EF/03 - 67 52 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 15
HWS fRY013pI - 59 52 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 7
S1 S1 (Supply Fan
Outlet in
Duct)
- 86 68 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 31
S2 S2 (Supply Fan
Outlet in
Duct)
- 79 67 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 25
A-weighted total (dB) 
(All plant running simultaneously) 
33

Page 393

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |103
Noise Emissions from Proposed Mechanical Plant Installations – Proposed Dwelling 2 
Plan
Reference
Plant Item  dBA 
@1m
dB
LWA
Distance
to NSR
(m)
Propagation Screening 
Correction
A-weighted
SPL @ NSR
S2/C1 Mitsubishi
ZRP200
(Heating)
62 - 37 - -10 20
S2/C2 Mitsubishi
ZRP200
(Heating)
62 - 36 -  -10 21
S1/C1 Mitsubishi
ZRP250
(Heating)
62 - 40 -  -10 20
S1/C2 Mitsubishi
ZRP250
(Heating)
62 - 39 -  -10 20
S1/C3 Mitsubishi
ZRP250
(Heating)
62 - 39 -  -10 20
EF/01 BW10
(Breakout
@1m)
67 - 27 -  -10 29
AC/02 Mitsubishi
M50FA
- 51 28 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 4
AC/03 Mitsubishi
PUZ-ZM71VHA
- 67 30 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 19
EF/02 EF/02 - 67 27 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 19
EF/03 EF/03 - 67 21 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 23
HWS fRY013pI - 59 21 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 15
S1 S1 (Supply Fan
Outlet in
Duct)
- 86 45 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 35
S2 S2 (Supply Fan
Outlet in
Duct)
- 79 43 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 29
A-weighted total (dB) 
(All plant running simultaneously) 
37

Page 394

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |104
Noise Emissions from Proposed Mechanical Plant Installations – Proposed Dwelling 3 
Plan
Reference
Plant Item  dBA 
@1m
dB
LWA
Distance
to NSR
(m)
Propagation Screening 
Correction
A-weighted
SPL @ NSR
S2/C1 Mitsubishi
ZRP200
(Heating)
62 - 36 - -10 21
S2/C2 Mitsubishi
ZRP200
(Heating)
62 - 36 -  -10 21
S1/C1 Mitsubishi
ZRP250
(Heating)
62 - 36 -  -10 21
S1/C2 Mitsubishi
ZRP250
(Heating)
62 - 35 -  -10 21
S1/C3 Mitsubishi
ZRP250
(Heating)
62 - 34 -  -10 21
EF/01 BW10
(Breakout
@1m)
67 - 26 -  -10 29
AC/02 Mitsubishi
M50FA
- 51 23 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 6
AC/03 Mitsubishi
PUZ-ZM71VHA
- 67 24 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 21
EF/02 EF/02 - 67 22 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 21
EF/03 EF/03 - 67 18 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 24
HWS fRY013pI - 59 18 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 16
S1 S1 (Supply Fan
Outlet in
Duct)
- 86 40 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 36
S2 S2 (Supply Fan
Outlet in
Duct)
- 79 38 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 30
A-weighted total (dB) 
(All plant running simultaneously) 
38

Page 395

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |105
Noise Emissions from Proposed Mechanical Plant Installations – Proposed Dwelling 4 
Plan
Reference
Plant Item  dBA 
@1m
dB
LWA
Distance
to NSR
(m)
Propagation Screening 
Correction
A-weighted
SPL @ NSR
S2/C1 Mitsubishi
ZRP200
(Heating)
62 - 36 - -10 21
S2/C2 Mitsubishi
ZRP200
(Heating)
62 - 35 -  -10 21
S1/C1 Mitsubishi
ZRP250
(Heating)
62 - 38 -  -10 21
S1/C2 Mitsubishi
ZRP250
(Heating)
62 - 37 -  -10 21
S1/C3 Mitsubishi
ZRP250
(Heating)
62 - 36 -  -10 21
EF/01 BW10
(Breakout
@1m)
67 - 25 -  -10 29
AC/02 Mitsubishi
M50FA
- 51 27 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 4
AC/03 Mitsubishi
PUZ-ZM71VHA
- 67 25 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 21
EF/02 EF/02 - 67 24 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 20
EF/03 EF/03 - 67 18 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 24
HWS fRY013pI - 59 18 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 16
S1 S1 (Supply Fan
Outlet in
Duct)
- 86 42 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 35
S2 S2 (Supply Fan
Outlet in
Duct)
- 79 41 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 29
A-weighted total (dB) 
(All plant running simultaneously) 
38

Page 396

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |106
Noise Emissions from Proposed Mechanical Plant Installations – Proposed Dwelling 5 
Plan
Reference
Plant Item  dBA 
@1m
dB
LWA
Distance
to NSR
(m)
Propagation Screening 
Correction
A-weighted
SPL @ NSR
S2/C1 Mitsubishi
ZRP200
(Heating)
62 - 35 - -10 21
S2/C2 Mitsubishi
ZRP200
(Heating)
62 - 35 -  -10 21
S1/C1 Mitsubishi
ZRP250
(Heating)
62 - 36 -  -10 21
S1/C2 Mitsubishi
ZRP250
(Heating)
62 - 35 -  -10 21
S1/C3 Mitsubishi
ZRP250
(Heating)
62 - 34 -  -10 21
EF/01 BW10
(Breakout
@1m)
67 - 25 -  -10 29
AC/02 Mitsubishi
M50FA
- 51 23 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 6
AC/03 Mitsubishi
PUZ-ZM71VHA
- 67 24 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 21
EF/02 EF/02 - 67 22 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 21
EF/03 EF/03 - 67 16 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 25
HWS fRY013pI - 59 16 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 17
S1 S1 (Supply Fan
Outlet in
Duct)
- 86 40 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 36
S2 S2 (Supply Fan
Outlet in
Duct)
- 79 39 On a reflective
surface: 
Q-factor of 2 
(+ 3dB) 
-10 29
A-weighted total (dB) 
(All plant running simultaneously) 
38

Page 397

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |107
Appendix E – Delivery Noise Emissions Tables 
Delivery Noise Emissions at Lodge 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
1hour
HGV Passage 5 80 -10 49 1 13
Goods
Loading and
Unloading 
6 61 -10 70 1 34
HGV Engine
Starting and
Idling 
5 65 -10 57 1 21
HGV Pulling
Off
7 58 -10 60 1 24
HGV Passage 5 54 -10 52 1 17
HGV Passage 5 65 -10 51 1 15
HGV Pulling
Off
7 74 -10 58 1 22
Total dBLAeq, 1hour  35 
Delivery Noise Emissions at Ardlui 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
1hour
HGV Passage 5 78 -10 49 1 14
Goods
Loading and
Unloading 
6 59 -10 70 1 35
HGV Engine
Starting and
Idling 
5 64 -10 57 1 21
HGV Pulling
Off
7 57 -10 60 1 24
HGV Passage 5 54 -10 52 1 17
HGV Passage 5 64 -10 51 1 15
HGV Pulling
Off
7 78 -10 57 1 21
Total dBLAeq, 1hour  35

Page 398

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |108
Delivery Noise Emissions at Langdale 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
1hour
HGV Passage 5 72 -10 50 1 14
Goods
Loading and
Unloading 
6 55 -10 71 1 35
HGV Engine
Starting and
Idling 
5 60 -10 57 1 22
HGV Pulling
Off
7 60 -10 59 1 24
HGV Passage 5 58 -10 52 1 16
HGV Passage 5 70 -10 50 1 15
HGV Pulling
Off
7 97 -10 55 1 20
Total dBLAeq, 1hour  36 
Delivery Noise Emissions at Kinvaid 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
1hour
HGV Passage 5 80 -10 49 1 13
Goods
Loading and
Unloading 
6 60 -10 70 1 34
HGV Engine
Starting and
Idling 
5 66 -10 57 1 21
HGV Pulling
Off
7 66 -10 59 1 23
HGV Passage 5 66 -10 51 1 15
HGV Passage 5 78 -10 49 1 14
HGV Pulling
Off
7 106 -10 54 1 19
Total dBLAeq, 1hour  35

Page 399

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |109
Delivery Noise Emissions at Proposed Dwelling 1 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
1hour
HGV Passage 5 27 -10 58 1 23
Goods
Loading and
Unloading 
6 28 -10 77 1 41
HGV Engine
Starting and
Idling 
5 28 -10 64 1 28
HGV Pulling
Off
7 29 -10 66 1 30
HGV Passage 5 51 -10 53 1 17
HGV Passage 5 47 -10 54 1 18
HGV Pulling
Off
7 45 -10 62 1 26
Total dBLAeq, 1hour  42 
Delivery Noise Emissions at Proposed Dwelling 2 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
1hour
HGV Passage 5 30 -10 57 1 22
Goods
Loading and
Unloading 
6 17 -10 81 1 45
HGV Engine
Starting and
Idling 
5 17 -10 68 1 33
HGV Pulling
Off
7 22 -10 68 1 32
HGV Passage 5 39 -10 55 1 20
HGV Passage 5 42 -10 55 1 19
HGV Pulling
Off
7 49 -10 61 1 26
Total dBLAeq, 1hour  46

Page 400

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |110
Delivery Noise Emissions at Proposed Dwelling 3 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
1hour
HGV Passage 5 46 -10 54 1 18
Goods
Loading and
Unloading 
6 32 -10 75 1 40
HGV Engine
Starting and
Idling 
5 24 -10 65 1 30
HGV Pulling
Off
7 22 -10 68 1 32
HGV Passage 5 32 -10 57 1 21
HGV Passage 5 45 -10 54 1 18
HGV Pulling
Off
7 60 -10 59 1 24
Total dBLAeq, 1hour  41 
Delivery Noise Emissions at Proposed Dwelling 4 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
1hour
HGV Passage 5 32 -10 57 1 21
Goods
Loading and
Unloading 
6 18 -10 80 1 45
HGV Engine
Starting and
Idling 
5 18 -10 68 1 32
HGV Pulling
Off
7 19 -10 69 1 34
HGV Passage 5 36 -10 56 1 20
HGV Passage 5 45 -10 54 1 18
HGV Pulling
Off
7 50 -10 61 1 25
Total dBLAeq, 1hour  46

Page 401

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |111
Delivery Noise Emissions at Proposed Dwelling 5 
Source Measurement
Distance (m) 
Receptor
Distance
(m)
Screening
Correction
LAE @
Receptor
Number
of Events
dB LAeq,
1hour
HGV Passage 5 37 -10 56 1 20
Goods
Loading and
Unloading 
6 23 -10 78 1 43
HGV Engine
Starting and
Idling 
5 23 -10 66 1 30
HGV Pulling
Off
7 18 -10 70 1 34
HGV Passage 5 34 -10 56 1 21
HGV Passage 5 42 -10 55 1 19
HGV Pulling
Off
7 54 -10 60 1 25
Total dBLAeq, 1hour  44

Page 402

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |112
Appendix F – Waste Collection Noise Emissions Tables
Waste Collection Noise Emissions – Lodge 
Source dB LAeq, T
@10m
On-
time
(min)
On-time
Correction
(dB)
dB LAeq,
1-hour
@10m
Receptor 
Distance
(m)
Screening 
Correction
dB LAeq, 1-hour
@Receptor
Refuse
Wagon 
78 5 -10.8 67 58 -10 42 
Waste Collection Noise Emissions – Ardlui 
Source dB LAeq, T
@10m
On-
time
(min)
On-time
Correction
(dB)
dB LAeq,
1-hour
@10m
Receptor 
Distance
(m)
Screening 
Correction
dB LAeq, 1-hour
@Receptor
Refuse
Wagon 
78 5 -10.8 67 53 -10 43 
Waste Collection Noise Emissions – Langdale 
Source dB LAeq, T
@10m
On-
time
(min)
On-time
Correction
(dB)
dB LAeq,
1-hour
@10m
Receptor 
Distance
(m)
Screening 
Correction
dB LAeq, 1-hour
@Receptor
Refuse
Wagon 
78 5 -10.8 67 55 -10 42 
Waste Collection Noise Emissions – Kinvaid 
Source dB LAeq, T
@10m
On-
time
(min)
On-time
Correction
(dB)
dB LAeq,
1-hour
@10m
Receptor 
Distance
(m)
Screening 
Correction
dB LAeq, 1-hour
@Receptor
Refuse
Wagon 
78 5 -10.8 67 58 -10 42 
Waste Collection Noise Emissions – Proposed Dwelling 1 
Source dB LAeq, T
@10m
On-
time
(min)
On-time
Correction
(dB)
dB LAeq,
1-hour
@10m
Receptor 
Distance
(m)
Screening 
Correction
dB LAeq, 1-hour
@Receptor
Refuse
Wagon 
78 5 -10.8 67 37 -10 46 
Waste Collection Noise Emissions – Proposed Dwelling 2 
Source dB LAeq, T
@10m
On-
time
(min)
On-time
Correction
(dB)
dB LAeq,
1-hour
@10m
Receptor 
Distance
(m)
Screening 
Correction
dB LAeq, 1-hour
@Receptor
Refuse
Wagon 
78 5 -10.8 67 17 -10 52

Page 403

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |113
Waste Collection Noise Emissions – Proposed Dwelling 3 
Source dB LAeq, T
@10m
On-
time
(min)
On-time
Correction
(dB)
dB LAeq,
1-hour
@10m
Receptor 
Distance
(m)
Screening 
Correction
dB LAeq, 1-hour
@Receptor
Refuse
Wagon 
78 5 -10.8 67 16 -10 53 
Waste Collection Noise Emissions – Proposed Dwelling 4 
Source dB LAeq, T
@10m
On-
time
(min)
On-time
Correction
(dB)
dB LAeq,
1-hour
@10m
Receptor 
Distance
(m)
Screening 
Correction
dB LAeq, 1-hour
@Receptor
Refuse
Wagon 
78 5 -10.8 67 16 -10 53 
Waste Collection Noise Emissions – Proposed Dwelling 5 
Source dB LAeq, T
@10m
On-
time
(min)
On-time
Correction
(dB)
dB LAeq,
1-hour
@10m
Receptor 
Distance
(m)
Screening 
Correction
dB LAeq, 1-hour
@Receptor
Refuse
Wagon 
78 5 -10.8 67 19 -10 51

Page 404

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |114
Appendix G – Specific Sound Levels Tables 
Specific Sound Level – Daytime – Typical Worst Case – Lodge 
Source dB LAeq, 1hour 
Car Park and Drive-Thru vehicle Movements 44
Customer Order Display 28
Fixed Plant Installations 39
Specific Sound Level dBLAeq,1hour  45 
Specific Sound Level – Daytime – Absolute Worst Case – Lodge 
Source dB LAeq, 1hour 
Car Park and Drive-Thru vehicle Movements 44
Customer Order Display 28
Fixed Plant Installations 39
Waste Collection  42
Specific Sound Level dBLAeq,1hour  47 
Specific Sound Level – Night-time – Lodge 
Source dB LAeq, 15-minute 
Car Park and Drive-Thru vehicle Movements 39
Customer Order Display 12
Fixed Plant Installations 39
Specific Sound Level dBLAeq,15-min  42

Page 405

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |115
Specific Sound Level – Daytime – Typical Worst Case – Ardlui 
Source dB LAeq, 1hour 
Car Park and Drive-Thru vehicle Movements 45
Customer Order Display 31
Fixed Plant Installations 39
Specific Sound Level dBLAeq,1hour  46 
Specific Sound Level – Daytime – Absolute Worst Case – Ardlui 
Source dB LAeq, 1hour 
Car Park and Drive-Thru vehicle Movements 45
Customer Order Display 31
Fixed Plant Installations 39
Waste Collection  43
Specific Sound Level dBLAeq,1hour  48 
Specific Sound Level – Night-time – Ardlui 
Source dB LAeq, 15-minute 
Car Park and Drive-Thru vehicle Movements 38
Customer Order Display 15
Fixed Plant Installations 39
Specific Sound Level dBLAeq,15-min  42

Page 406

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |116
Specific Sound Level – Daytime – Typical Worst Case – Langdale 
Source dB LAeq, 1hour 
Car Park and Drive-Thru vehicle Movements 42
Customer Order Display 33
Fixed Plant Installations 37
Specific Sound Level dBLAeq,1hour  44 
Specific Sound Level – Daytime – Absolute Worst Case – Langdale 
Source dB LAeq, 1hour 
Car Park and Drive-Thru vehicle Movements 42
Customer Order Display 33
Fixed Plant Installations 37
Delivery Noise  36
Waste Collection  42
Specific Sound Level dBLAeq,1hour  46 
Specific Sound Level – Night-time – Langdale 
Source dB LAeq, 15-minute 
Car Park and Drive-Thru vehicle Movements 36
Customer Order Display 17
Fixed Plant Installations 37
Specific Sound Level dBLAeq,15-min  40

Page 407

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |117
Specific Sound Level – Daytime – Typical Worst Case – Kinvaid 
Source dB LAeq, 1hour 
Car Park and Drive-Thru vehicle Movements 41
Customer Order Display 32
Fixed Plant Installations 37
Specific Sound Level dBLAeq,1hour  43 
Specific Sound Level – Daytime – Absolute Worst Case – Kinvaid 
Source dB LAeq, 1hour 
Car Park and Drive-Thru vehicle Movements 41
Customer Order Display 32
Fixed Plant Installations 37
Waste Collection  42
Specific Sound Level dBLAeq,1hour  45 
Specific Sound Level – Night-time – Kinvaid 
Source dB LAeq, 15-minute 
Car Park and Drive-Thru vehicle Movements 34
Customer Order Display 16
Fixed Plant Installations 37
Specific Sound Level dBLAeq,15-min  39

Page 408

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |118
Specific Sound Level – Daytime – Typical Worst Case – Proposed Dwelling 1 
Source dB LAeq, 1hour 
Car Park and Drive-Thru vehicle Movements 43
Customer Order Display 23
Fixed Plant Installations 33
Specific Sound Level dBLAeq,1hour  43 
Specific Sound Level – Daytime – Absolute Worst Case – Proposed Dwelling 1 
Source dB LAeq, 1hour 
Car Park and Drive-Thru vehicle Movements 43
Customer Order Display 23
Fixed Plant Installations 33
Waste Collection  46
Specific Sound Level dBLAeq,1hour  49 
Specific Sound Level – Night-time – Proposed Dwelling 1 
Source dB LAeq, 15-minute 
Car Park and Drive-Thru vehicle Movements 43
Customer Order Display 21
Fixed Plant Installations 33
Specific Sound Level dBLAeq,15-min  43

Page 409

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |119
Specific Sound Level – Daytime – Typical Worst Case – Proposed Dwelling 2 
Source dB LAeq, 1hour 
Car Park and Drive-Thru vehicle Movements 47
Customer Order Display 32
Fixed Plant Installations 37
Specific Sound Level dBLAeq,1hour  48 
Specific Sound Level – Daytime – Absolute Worst Case – Proposed Dwelling 2 
Source dB LAeq, 1hour 
Car Park and Drive-Thru vehicle Movements 47
Customer Order Display 32
Fixed Plant Installations 37
Waste Collection  52
Specific Sound Level dBLAeq,1hour  54 
Specific Sound Level – Night-time – Proposed Dwelling 2 
Source dB LAeq, 15-minute 
Car Park and Drive-Thru vehicle Movements 46
Customer Order Display 30
Fixed Plant Installations 33
Specific Sound Level dBLAeq,15-min  46

Page 410

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |120
Specific Sound Level – Daytime – Typical Worst Case – Proposed Dwelling 3 
Source dB LAeq, 1hour 
Car Park and Drive-Thru vehicle Movements 49
Customer Order Display 30
Fixed Plant Installations 38
Specific Sound Level dBLAeq,1hour  49 
Specific Sound Level – Daytime – Absolute Worst Case – Proposed Dwelling 3 
Source dB LAeq, 1hour 
Car Park and Drive-Thru vehicle Movements 49
Customer Order Display 30
Fixed Plant Installations 38
Waste Collection  53
Specific Sound Level dBLAeq,1hour  55 
Specific Sound Level – Night-time – Proposed Dwelling 3 
Source dB LAeq, 15-minute 
Car Park and Drive-Thru vehicle Movements 47
Customer Order Display 28
Fixed Plant Installations 38
Specific Sound Level dBLAeq,15-min  48

Page 411

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |121
Specific Sound Level – Daytime – Typical Worst Case – Proposed Dwelling 4 
Source dB LAeq, 1hour 
Car Park and Drive-Thru vehicle Movements 47
Customer Order Display 32
Fixed Plant Installations 38
Specific Sound Level dBLAeq,1hour  48 
Specific Sound Level – Daytime – Absolute Worst Case – Proposed Dwelling 4 
Source dB LAeq, 1hour 
Car Park and Drive-Thru vehicle Movements 47
Customer Order Display 32
Fixed Plant Installations 38
Waste Collection  53
Specific Sound Level dBLAeq,1hour  54 
Specific Sound Level – Night-time – Proposed Dwelling 4 
Source dB LAeq, 15-minute 
Car Park and Drive-Thru vehicle Movements 46
Customer Order Display 30
Fixed Plant Installations 38
Specific Sound Level dBLAeq,15-min  47

Page 412

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |122
Specific Sound Level – Daytime – Typical Worst Case – Proposed Dwelling 5 
Source dB LAeq, 1hour 
Car Park and Drive-Thru vehicle Movements 47
Customer Order Display 32
Fixed Plant Installations 38
Specific Sound Level dBLAeq,1hour  48 
Specific Sound Level – Daytime – Absolute Worst Case – Proposed Dwelling 5 
Source dB LAeq, 1hour 
Car Park and Drive-Thru vehicle Movements 47
Customer Order Display 32
Fixed Plant Installations 38
Waste Collection  51
Specific Sound Level dBLAeq,1hour  53 
Specific Sound Level – Night-time – Proposed Dwelling 5 
Source dB LAeq, 15-minute 
Car Park and Drive-Thru vehicle Movements 46
Customer Order Display 30
Fixed Plant Installations 38
Specific Sound Level dBLAeq,15-min  47

Page 413

Appendix H – Predicted Vehicle Movements

Page 414

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |124
Appendix I – Proposed Site Plan

Page 415

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |125
Appendix J – Proposed 1.8m Fence Line 
1.8m Fence
Line

Page 416

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |126
Appendix K – Fixed Plant Noise Levels (Including Mitigation Measures)
Plant Noise Emissions – Lodge 
Plan
Reference
Plant Item  dBA 
@1m
dB LWA Distance to
NSR (m)
Propagation Screening 
Correction
A-weighted
SPL @ NSR
S2/C1 Mitsubishi
ZRP200 (Heating)
62 - 39 - -10 21
S2/C2 Mitsubishi ZRP200
(Heating)
62 - 39 -  -10 21
S1/C1 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 21
S1/C2 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 21
S1/C3 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 21
EF/01 BW10
(Breakout @1m)
67 - 41 -  -10 25
AC/02 Mitsubishi M50FA - 51 47 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 -
AC/03 Mitsubishi PUZ-
ZM71VHA
- 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 17
EF/02 EF/02 - 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 15
EF/03 EF/03 - 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 16
HWS fRY013pI - 59 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 8
S1 S1 (Supply Fan Outlet
in Duct)
- 86 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 25
S2 S2 (Supply Fan Outlet
in Duct)
- 79 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 19
A-weighted total (dB) 
(All plant running simultaneously) 
32

Page 417

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |127
Plant Noise Emissions – Ardlui 
Plan
Reference
Plant Item  dBA 
@1m
dB LWA Distance to
NSR (m)
Propagation Screening 
Correction
A-weighted
SPL @ NSR
S2/C1 Mitsubishi
ZRP200 (Heating)
62 - 39 - -10 21
S2/C2 Mitsubishi ZRP200
(Heating)
62 - 39 -  -10 21
S1/C1 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 21
S1/C2 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 21
S1/C3 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 21
EF/01 BW10
(Breakout @1m)
67 - 41 -  -10 26
AC/02 Mitsubishi M50FA - 51 47 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 -
AC/03 Mitsubishi PUZ-
ZM71VHA
- 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 18
EF/02 EF/02 - 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 15
EF/03 EF/03 - 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 16
HWS fRY013pI - 59 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 9
S1 S1 (Supply Fan Outlet
in Duct)
- 86 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 25
S2 S2 (Supply Fan Outlet
in Duct)
- 79 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 19
A-weighted total (dB) 
(All plant running simultaneously) 
32

Page 418

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |128
Plant Noise Emissions – Langdale 
Plan
Reference
Plant Item  dBA 
@1m
dB LWA Distance to
NSR (m)
Propagation Screening 
Correction
A-weighted
SPL @ NSR
S2/C1 Mitsubishi
ZRP200 (Heating)
62 - 39 - -10 20
S2/C2 Mitsubishi ZRP200
(Heating)
62 - 39 -  -10 20
S1/C1 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 20
S1/C2 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 20
S1/C3 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 20
EF/01 BW10
(Breakout @1m)
67 - 41 -  -10 25
AC/02 Mitsubishi M50FA - 51 47 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 -
AC/03 Mitsubishi PUZ-
ZM71VHA
- 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 17
EF/02 EF/02 - 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 16
EF/03 EF/03 - 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 17
HWS fRY013pI - 59 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 9
S1 S1 (Supply Fan Outlet
in Duct)
- 86 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 23
S2 S2 (Supply Fan Outlet
in Duct)
- 79 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 17
A-weighted total (dB) 
(All plant running simultaneously) 
31

Page 419

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |129
Plant Noise Emissions – Kinvaid 
Plan
Reference
Plant Item  dBA 
@1m
dB LWA Distance to
NSR (m)
Propagation Screening 
Correction
A-weighted SPL
@ NSR
S2/C1 Mitsubishi
ZRP200 (Heating)
62 - 39 - -10 18
S2/C2 Mitsubishi ZRP200
(Heating)
62 - 39 -  -10 18
S1/C1 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 18
S1/C2 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 18
S1/C3 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 18
EF/01 BW10
(Breakout @1m)
67 - 41 -  -10 24
AC/02 Mitsubishi M50FA - 51 47 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 -
AC/03 Mitsubishi PUZ-
ZM71VHA
- 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 15
EF/02 EF/02 - 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 15
EF/03 EF/03 - 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 16
HWS fRY013pI - 59 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 8
S1 S1 (Supply Fan Outlet
in Duct)
- 86 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 21
S2 S2 (Supply Fan Outlet
in Duct)
- 79 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 15
A-weighted total (dB) 
(All plant running simultaneously) 
29

Page 420

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |130
Plant Noise Emissions – Proposed Dwelling 1 
Plan
Reference
Plant Item  dBA 
@1m
dB LWA Distance to
NSR (m)
Propagation Screening 
Correction
A-weighted SPL
@ NSR
S2/C1 Mitsubishi
ZRP200 (Heating)
62 - 39 - -10 18
S2/C2 Mitsubishi ZRP200
(Heating)
62 - 39 -  -10 18
S1/C1 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 18
S1/C2 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 18
S1/C3 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 18
EF/01 BW10
(Breakout @1m)
67 - 41 -  -10 24
AC/02 Mitsubishi M50FA - 51 47 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 -
AC/03 Mitsubishi PUZ-
ZM71VHA
- 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 15
EF/02 EF/02 - 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 15
EF/03 EF/03 - 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 16
HWS fRY013pI - 59 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 8
S1 S1 (Supply Fan Outlet
in Duct)
- 86 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 21
S2 S2 (Supply Fan Outlet
in Duct)
- 79 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 15
A-weighted total (dB) 
(All plant running simultaneously) 
29

Page 421

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |131
Plant Noise Emissions – Proposed Dwelling 2 
Plan
Reference
Plant Item  dBA 
@1m
dB LWA Distance to
NSR (m)
Propagation Screening 
Correction
A-weighted SPL
@ NSR
S2/C1 Mitsubishi
ZRP200 (Heating)
62 - 39 - -10 18
S2/C2 Mitsubishi ZRP200
(Heating)
62 - 39 -  -10 18
S1/C1 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 18
S1/C2 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 18
S1/C3 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 18
EF/01 BW10
(Breakout @1m)
67 - 41 -  -10 24
AC/02 Mitsubishi M50FA - 51 47 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 -
AC/03 Mitsubishi PUZ-
ZM71VHA
- 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 15
EF/02 EF/02 - 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 15
EF/03 EF/03 - 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 16
HWS fRY013pI - 59 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 8
S1 S1 (Supply Fan Outlet
in Duct)
- 86 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 21
S2 S2 (Supply Fan Outlet
in Duct)
- 79 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 15
A-weighted total (dB) 
(All plant running simultaneously) 
29

Page 422

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |132
Plant Noise Emissions -   Proposed Dwelling 3 
Plan
Reference
Plant Item  dBA 
@1m
dB LWA Distance to
NSR (m)
Propagation Screening 
Correction
A-weighted SPL
@ NSR
S2/C1 Mitsubishi
ZRP200 (Heating)
62 - 39 - -10 18
S2/C2 Mitsubishi ZRP200
(Heating)
62 - 39 -  -10 18
S1/C1 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 18
S1/C2 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 18
S1/C3 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 18
EF/01 BW10
(Breakout @1m)
67 - 41 -  -10 24
AC/02 Mitsubishi M50FA - 51 47 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 -
AC/03 Mitsubishi PUZ-
ZM71VHA
- 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 15
EF/02 EF/02 - 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 15
EF/03 EF/03 - 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 16
HWS fRY013pI - 59 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 8
S1 S1 (Supply Fan Outlet
in Duct)
- 86 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 21
S2 S2 (Supply Fan Outlet
in Duct)
- 79 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 15
A-weighted total (dB) 
(All plant running simultaneously) 
29

Page 423

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |133
Plant Noise Emissions -   Proposed Dwelling 4 
Plan
Reference
Plant Item  dBA 
@1m
dB LWA Distance to
NSR (m)
Propagation Screening 
Correction
A-weighted SPL
@ NSR
S2/C1 Mitsubishi
ZRP200 (Heating)
62 - 39 - -10 18
S2/C2 Mitsubishi ZRP200
(Heating)
62 - 39 -  -10 18
S1/C1 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 18
S1/C2 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 18
S1/C3 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 18
EF/01 BW10
(Breakout @1m)
67 - 41 -  -10 24
AC/02 Mitsubishi M50FA - 51 47 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 -
AC/03 Mitsubishi PUZ-
ZM71VHA
- 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 15
EF/02 EF/02 - 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 15
EF/03 EF/03 - 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 16
HWS fRY013pI - 59 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 8
S1 S1 (Supply Fan Outlet
in Duct)
- 86 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 21
S2 S2 (Supply Fan Outlet
in Duct)
- 79 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 15
A-weighted total (dB) 
(All plant running simultaneously) 
29

Page 424

Noise Impact Assessment      McDonald’s Blairgowrie
August 2025 Page |134
Plant Noise Emissions -   Proposed Dwelling 5 
Plan
Reference
Plant Item  dBA 
@1m
dB LWA Distance to
NSR (m)
Propagation Screening 
Correction
A-weighted SPL
@ NSR
S2/C1 Mitsubishi
ZRP200 (Heating)
62 - 39 - -10 18
S2/C2 Mitsubishi ZRP200
(Heating)
62 - 39 -  -10 18
S1/C1 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 18
S1/C2 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 18
S1/C3 Mitsubishi ZRP250
(Heating)
62 - 41 -  -10 18
EF/01 BW10
(Breakout @1m)
67 - 41 -  -10 24
AC/02 Mitsubishi M50FA - 51 47 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 -
AC/03 Mitsubishi PUZ-
ZM71VHA
- 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 15
EF/02 EF/02 - 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 15
EF/03 EF/03 - 67 39 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 16
HWS fRY013pI - 59 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 8
S1 S1 (Supply Fan Outlet
in Duct)
- 86 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 21
S2 S2 (Supply Fan Outlet
in Duct)
- 79 41 On a reflective surface: 
Q-factor of 2 (+ 3dB) 
-10 15
A-weighted total (dB) 
(All plant running simultaneously) 
29