Page 1

5(i)(c) 
LRB-2026-07 
LRB-2026-07
25/00996/IPL - Erection of a dwellinghouse (in principle),
land 45 metres west of Lunanbrae, Wester Essendy,
Blairgowrie, PH10 6RA 
Representations

Page 2

No embedded text on this page.

Page 3

SW Internal
General
Tuesday, 29 July 2025 
Local Planner
Planning and Development
Perth and Kinross Council
Perth
PH1 5GD 
Dear Customer, 
Land 45 Metres West Of Lunanbrae, Wester Essendy, Blairgowrie, PH10 6RA
Planning Ref: 25/00996/IPL 
Our Ref: DSCAS-0137261-59N
Proposal: Erection of a dwellinghouse (in principle) 
Please quote our reference in all future correspondence 
Scottish Water has no objection to this planning application. The applicant should be aware
that this does not confirm that the proposed development can currently be serviced.    
Please read the following carefully as there may be further action required. Scottish Water
would advise the following: 
Water Capacity Assessment 
• This proposed development is within the Lintrathen  Water Treatment Works
catchment. Single house developments; unless utilising private water sources, are
required to submit a Water Connection Application via our Customer Portal to allow
us to fully appraise the proposals. We recommend that this is done at the earliest
opportunity to allow for network appraisal to be carried out ahead of development
proceeding. 
Waste Water Capacity Assessment 
• ccording to our records there is no public waste water infrastructure within the vicinity
of this proposed development therefore we would advise applicant to investigate
private treatment options. 
Development Operations
The Bridge
Buchanan Gate Business Park
Cumbernauld Road
Stepps
Glasgow
G33 6FB 
Development Operations
Freephone  Number - 0800 3890379
E-Mail - DevelopmentOperations@scottishwater.co.uk
www.scottishwater.co.uk

Page 4

SW Internal
General
Please Note 
The applicant should be aware that we are unable to reserve capacity at our water and/or
waste water treatment works. When planning permission has been granted and a formal
connection application has been submitted, we will review the availability of capacity at that
time and advise the applicant accordingly. 
Surface Water    
For reasons of sustainability and to protect our customers from potential future sewer
flooding, Scottish Water will not accept any surface water connections into our combined
sewer system. 
There may be limited exceptional circumstances where we would allow such a connection
for brownfield sites only, however this will require significant justification from the customer
taking account of various factors including legal, physical, and technical challenges. 
In order to avoid costs and delays where a surface water discharge to our combined sewer
system is anticipated, the developer should refer to our guides which can be found at
https://www.scottishwater.co.uk/Help-and-Resources/Document-Hub/Business-and-
Developers/Connecting-to-Our-Network which detail our policy and processes to support the
application process, evidence to support the intended drainage plan should be submitted at
the technical application stage where we will assess this evidence in a robust manner and
provide a decision that reflects the best option from environmental and customer
perspectives. 
Next Steps:     
Single house developments; unless utilising private water or drainage sources, are
required to submit a Water Connection Application and Waste Water Application via
our Customer Portal to allow us to fully appraise the proposals. Please note that
Single House developments are not required to submit a Pre-Development Enquiry
form (PDE) however local network capacity will be assessed on receipt of application
forms. 
Further information on our application and connection process for Single Household
development can be found on our website https://www.scottishwater.co.uk/Business-
and-Developers/NEW-Connecting-to-Our-Network/Single-Household-Customers 
I trust the above is acceptable however if you require any further information regarding this
matter, please contact me on 0800 389 0379 or via the e-mail address below or at
planningconsultations@scottishwater.co.uk.    
Yours sincerely,    
Ruth Kerr
Development Services Analyst 
PlanningConsultations@scottishwater.co.uk

Page 5

SW Internal
General
Scottish Water Disclaimer:    
“It is important to note that the information on any such plan provided on Scottish Water’s
infrastructure, is for indicative purposes only and its accuracy cannot be relied upon.  When the
exact location and the nature of the infrastructure on the plan is a material requirement then you
should undertake an appropriate site investigation to confirm its actual position in the ground and
to determine if it is suitable for its intended purpose.  By using the plan you agree that Scottish
Water will not be liable for any loss, damage or costs caused by relying upon it or from carrying
out any such site investigation." 
Supplementary Guidance 
• Scottish Water asset plans can be obtained from our appointed asset plan
providers: 
• Site Investigation Services (UK) Ltd 
• Tel: 0333 123 1223   
• Email: sw@sisplan.co.uk 
• www.sisplan.co.uk 
• Scottish Water’s current minimum level of service for water pressure is 1.0
bar or 10m head at the customer’s boundary internal outlet.  Any property which
cannot be adequately serviced from the available pressure may require private
pumping arrangements to be installed, subject to compliance with Water
Byelaws. If the developer wishes to enquire about Scottish Water’s procedure for
checking the water pressure in the area, then they should write to the
Development Operations department at the above address. 
• If the connection to the public sewer and/or water main requires to be laid
through land out-with public ownership, the developer must provide evidence of
formal approval from the affected landowner(s) by way of a deed of servitude. 
• Scottish Water may only vest new water or waste water infrastructure which is
to be laid through land out with public ownership where a Deed of Servitude has
been obtained in our favour by the developer. 
• The developer should also be aware that Scottish Water requires land title to
the area of land where a pumping station and/or a Sustainable Drainage System
(SUDS) proposed to vest in Scottish Water is constructed. 
• Please find information on how to submit application to Scottish Water at our
Customer Portal

Page 6

Comments to the Development Quality Manager on a Planning Application
Planning Application
ref.
25/00996/IPL Comments
provided by
C Morilly
Transportation Development Officer
Service/Section Transportation &
Development
Contact
Details
TransportPlanning@pkc.gov.uk
Description of
Proposal
Erection of a single dwellinghouse (in principle)
Address of site Land 45 Metres West Of Lunanbrae Wester Essendy Blairgowrie
PH10 6RA, 56°34'33.1"N 3°24'11.1"W
Comments on the
proposal
Vehicle access to the site is proposed via a new junction on the C432 public road. On
submission of a detailed planning application, the applicant should consider:
 Vehicle access shall be detailed and formed in accordance with Perth and
Kinross Council’s Road Development Guide. All drainage infrastructure shall
be detailed on the site plan, demonstrating that an adequate road surface
water drainage system is achievable.
 Junction visibility should be formed in accordance with the Design Manual for
Roads and Bridges.
 The number of car parking spaces being provided for the dwellinghouse
should be in accordance with The National Roads Development Guide, based
on the number of bedrooms proposed. Should a garage be proposed for
parking, the size of space within the garage must be a minimum of 7.0m x
3.0m (internal dimensions).
 Turning facilities shall be provided within the site to enable vehicles to enter
and leave in a forward-facing gear. A swept path tracking may assist with this
assessment.
 The intention for waste collection shall be detailed, including a safe area of
hardstanding for the presentation of bins, and demonstrating that the waste
lorry is afforded adequate turning and manoeuvring space if required.
 The development shall not commence until the following specified matters
have been the subject of a formal planning application for the approval of the
Council as Planning Authority: All matters regarding access, vehicle parking
and turning facilities, walking and cycling facilities, the road layout, design
and specification (including the disposal of surface water), and waste
management provision shall be in accordance with the standards required by
the Council as Roads Authority (as detailed in the National Roads
Development Guide) and to the satisfaction of the Planning Authority.
To determine whether the proposed junction can support the development, please
detail the junction visibility splay on the site plan to ensure that it is deliverable.
Further detail is required.
Recommended
planning condition(s)
Further detail is required before Transport Planning can provide a recommendation
on this proposal.
Recommended
informative(s) for
applicant
Date comments
returned 06 August 2025.

Page 7

Comments to the Development Management & Building Standards Service
Manager on a Planning Application
Planning
Application ref.
25/00996/IPL Comments
provided
by
Alasdair Finlayson
Service/Section Place Strategies Contact
Details
Development Contributions Officer:
Email:
DevelopmentContributions@pkc.gov.uk
Description of
Proposal
Erection of a dwellinghouse (in principle)
Address of site Land 45 Metres West Of Lunanbrae Wester Essendy Blairgowrie PH10 6RA
Comments on the
proposal
Primary Education
With reference to the above planning application the Council Developer
Contributions Supplementary Guidance requires a financial contribution
towards increased primary school capacity in areas where a primary school
capacity constraint has been identified. A capacity constraint is defined as
where a primary school is operating at over 80% and is likely to be operating
following completion of the proposed development, extant planning
permissions and Local Development Plan allocations, at or above 100% of
total capacity.
This application site is in the catchment of Newhill Primary School. This is one
of the schools identified in Appendix 1 of the Supplementary Guidance where
a capacity issue has been identified and a condition to reflect this should be
attached to any planning application granted.
Recommended
planning
condition(s)
Primary Education
CO01 The development shall be in accordance with the requirements of
Perth & Kinross Council’s Developer Contributions and Affordable
Housing Supplementary Guidance 2023 in line with Policy 5:
Infrastructure Contributions of the Perth & Kinross Local
Development Plan 2 (2019) with particular regard to primary
education infrastructure, or such subsequent Guidance and Policy
which may replace these.
RCO00 Reason – To ensure the development is in accordance with the
terms of the Perth and Kinross Local Development Plan 2 (2019)
and to comply with the Council’s policy on Developer Contributions
and Affordable Housing Supplementary Guidance 2023.
Recommended
informative(s) for
applicant
N/A
Date comments
returned 5 December 2025

Page 8