Democracy Spraffa

(a) Notice of Review and supporting documents (Pages 7-142)

Perth and Kinross Council · 3 August 2026
Back to Local Review Body — 3 August 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.

Page 1

4(i)(a) 
LRB-2026-11 
LRB-2026-11 - 26/00461/IPL - Erection of dwellinghouse (in
principle), land 50 metres south east of Craigburn House,
Flawcraig, Rait, Perth, PH2 7RY 
Papers Submitted
by the
Applicant

Page 2

No embedded text on this page.

Page 3

Page 1 of 5
Pullar House 35 Kinnoull Street Perth PH1 5GD  Tel: 01738 475300  Email: onlineapps@pkc.gov.uk
Applications cannot be validated until all the necessary documentation has been submitted and the required fee has been paid.
Thank you for completing this application form:
ONLINE REFERENCE 100749913-002
The online reference is the unique reference for your online form only. The  Planning Authority will allocate an Application Number when
your form is validated. Please quote this reference if you need to contact the planning Authority about this application.
Applicant or Agent Details
Are you an applicant or an agent? * (An agent is an architect, consultant or someone else acting
on behalf of the applicant in connection with this application)  Applicant  Agent
Agent Details
Please enter Agent details
Company/Organisation:
Ref. Number: You must enter a Building Name or Number, or both: *
First Name: * Building Name:
Last Name: * Building Number:
Address 1
Telephone Number: * (Street): *
Extension Number: Address 2:
Mobile Number: Town/City: *
Fax Number: Country: *
Postcode: *
Email Address: *
Is the applicant an individual or an organisation/corporate entity? *
  Individual    Organisation/Corporate entity
Houghton Planning Ltd
Paul
Houghton MRTPI
Whins Road
Alloa Business Centre
07780117708
FK10 3RF
Scotland
Clacks
Alloa
paul@houghtonplanning.co.uk

Page 4

Page 2 of 5
Applicant Details
Please enter Applicant details
Title: You must enter a Building Name or Number, or both: *
Other Title: Building Name:
First Name: * Building Number:
Address 1
Last Name: * (Street): *
Company/Organisation Address 2:
Telephone Number: * Town/City: *
Extension Number: Country: *
Mobile Number: Postcode: *
Fax Number:
Email Address: *
Site Address Details
Planning Authority:
Full postal address of the site (including postcode where available):
Address 1: 
Address 2:
Address 3:
Address 4:
Address 5:
Town/City/Settlement:
Post Code:
Please identify/describe the location of the site or sites
Northing Easting
Mr
Stuart
Perth and Kinross Council
Heslop Rosebank Gardens
1
FK10 3RF
Land 50 metres South East of Craigburn House, Flawcraig, Rait, Perth, PH2 7RY
Scotland
Falkirk
Wallacestone
paul@houghtonplanning.co.uk

Page 5

Page 3 of 5
Description of Proposal
Please provide a description of your proposal to which your review relates. The description should be the same as given in the
application form, or as amended with the agreement of the planning authority: *
(Max 500 characters)
Type of Application
What type of application did you submit to the planning authority? *
  Application for planning permission (including householder application but excluding application to work minerals).
  Application for planning permission in principle.
  Further application.
  Application for approval of matters specified in conditions.
What does your review relate to? *
  Refusal Notice.
 Grant of permission with Conditions imposed.
  No decision reached within the prescribed period (two months after validation date or any agreed extension) – deemed refusal.
Statement of reasons for seeking review
You must state in full, why you are a seeking a review of the planning authority’s decision (or failure to make a decision). Your statement
must set out all matters you consider require  to be taken into account in determining your review. If necessary this can be provided as a
separate document in the ‘Supporting Documents’ section: *  (Max 500 characters)
Note: you are unlikely to have a further opportunity to add to your statement of appeal at a later date, so it is essential that you produce
all of the information you want the decision-maker to take into account.
You should not however raise any new matter which was not before the planning authority at the time it decided your application (or at
the time expiry of the period of determination), unless you can demonstrate that the new matter could not have been raised before that
time or that it not being raised before that time is a consequence of exceptional circumstances.
Have you raised any matters which were not before the appointed officer  at the time the  Yes   No
Determination on your application was made? *
If yes, you should explain in the box below, why you are raising the new matter, why it was not raised with the appointed officer before
your application was determined and why you consider it should be considered in your review: * (Max 500 characters)
Erection of dwellinghouse (in principle)
See Local Review Statement

Page 6

Page 4 of 5
Please provide a list of all supporting documents, materials and evidence which you wish to submit with your notice of review and intend
to rely on in support of your review. You can attach these documents electronically later in the process: * (Max 500 characters)
Application Details
Please provide the application reference no. given to you by your planning
authority for your previous application.
What date was the application submitted to the planning authority? *
What date was the decision issued by the planning authority? *
Review Procedure
The Local Review Body will decide on the procedure to be used to determine your review and may at any time during the review
process require that further information or representations be made to enable them to determine the review. Further information may be
required by one or a combination of procedures, such as: written submissions; the holding of one or more hearing sessions and/or
inspecting the land which is the subject of the review case.
Can this review continue to a conclusion, in your opinion, based on a review of the relevant information provided by yourself and other
parties only,  without any further procedures? For example, written submission, hearing session, site inspection. *
 Yes   No
Please indicate what procedure (or combination of procedures) you think is most appropriate for the handling of your review. You may
select more than one option if you wish the review to be a combination of procedures.
Please select a further procedure *
Please explain in detail in your own words why this further procedure is required and the matters set out in your statement of appeal it
will deal with?  (Max 500 characters)
In the event that the Local Review Body appointed to consider your application decides to inspect the site, in your opinion:
Can the site be clearly seen from a road or public land? *  Yes   No
Is it possible for the site to be accessed safely and without barriers to entry? *  Yes    No
If there are reasons why you think the local Review Body would be unable to undertake an unaccompanied site inspection, please
explain here.  (Max 500 characters)
Application as submitted. Report of Handling. Decision Notice. Local Review Statement.
26/00461/IPL
12/05/2026
By means of inspection of the land to which the review relates
Private land.
02/04/2026
To see the plot and the hedge surrounding it.

Page 7

Page 5 of 5
Checklist – Application for Notice of Review
Please complete the following checklist to make sure  you have provided all the necessary information in support of your appeal. Failure
to submit all this  information may result in your appeal  being deemed invalid.
Have you provided the name and address of the applicant?.  *  Yes   No
Have you provided the date and reference number of the application which is the subject of this  Yes   No
review? *
If you are the agent, acting on behalf of the applicant, have you provided details of your name  Yes   No   N/A
and address and indicated whether any notice or correspondence required in connection with the
review should be sent to you or the applicant? *
Have you provided a statement setting out your reasons for requiring a review and by what  Yes   No
procedure (or combination of procedures) you wish the review to be conducted? *
Note: You must state, in full, why you are seeking a review on your application. Your statement must set out all matters you consider
require to be taken into account in determining your review. You may not have a further opportunity to add to your statement of review
at a later date. It is therefore essential that you submit with your notice of review, all necessary information and evidence that you rely
on and wish the Local Review Body to consider as part of your review.
Please attach a copy of all documents, material and evidence which you intend to rely on  Yes   No
(e.g. plans and Drawings) which are now the subject of this review *
Note: Where the review relates to a further application e.g. renewal of planning permission or modification, variation or removal of a
planning condition or where it relates to an application for approval of matters specified in conditions, it is advisable to provide the
application reference number, approved plans and decision notice (if any) from the earlier consent.
Declare – Notice of Review
I/We the applicant/agent certify that this is an application for review on the grounds stated.
Declaration Name: Mr Paul Houghton MRTPI
Declaration Date: 18/05/2026
Payment Details
Pay Direct     
Created: 18/05/2026 10:18

Page 8

Local Review Statement 
INTRODUCTION 
This Local Review Statement has been prepared by Houghton Planning Ltd on behalf of
Mr Stuart Heslop in relation to the recent refusal of planning permission for the “Erection
of dwellinghouse (in principle)” at land 50 Metres South East of Craigburn House,
Flawcraig, Rait, Perth, PH2 7RY (ref: 26/00461/IPL). 
The planning application was refused for a single reason as follows: 
“The proposal is contrary to Policy 19 Housing in the Countryside of the Perth and
Kinross Council Local Development Plan 2 (2019) and the associated Housing in
the Countryside Supplementary Guidance 2020 (SG). Whilst the site is located
adjacent to a building group it cannot be considered to extend the group into a
definable site as the landscaping/hedging which has been planted along the south-
western boundary of the site has been planted with the sole purpose of creating a
development site. The SG explicitly states that "fencing or young trees or hedging
planted with the specific intention of creating a site will not be accepted as existing
landscape features for the purposes of this Supplementary Guidance". The
proposal also fails to meet any of the other categories of development outlined in
the SG. The proposal is also contrary to Policy 9(b) of National Planning
Framework 4 (NPF4) as the proposal is on a greenfield site and is not explicitly
supported by policies of the Perth and Kinross Local Development Plan 2 (2019).
The proposal also fails to meet any of the categories of development allowed by
Policy 17: Rural Homes of NPF4”. 
This Statement is set out in the same way as the Report of Handling, and responds to
that only as necessary to make the applicant’s case as to why planning permission in
principle should be granted, particularly at a time where there is a housing emergency in
Perth and Kinross, and more widely across Scotland. 
It should be noted that this application has been submitted by someone wishing to live on
the site with his family and contribute to the local community and economy. 
BACKGROUND AND DESCRIPTION OF PROPOSAL 
The planning appeal was 17 years ago, and relates to a site whose boundaries were less
well defined, and a time when the housing emergency was less acute. It is respectfully
contended that the planning history whilst a material consideration should carry no weight
whatsoever in the determination of this application. 
SITE HISTORY 
No comment.

Page 9

DEVELOPMENT PLAN 
No comment. 
OTHER MATERIAL CONSIDERATIONS 
Scottish Government - Tackling Scotland's Housing Emergency (September 2025) 
https://www.gov.scot/publications/tackling-scotlands-housing-emergency/ 
Scottish Government - Letter from the Cabinet Secretary for Housing and Minister for
Public Finance sent to planning authorities (October 2025)
https://www.gov.scot/publications/housing-sme-homebuilders-ministerial-letter-october-
2025/ 
CONSULTATION RESPONSES 
No comment. 
REPRESENTATIONS 
No comment. 
APPRAISAL 
Principle 
The proposal complies with the Council’s housing in the countryside guidance by being a
site that will be part of an existing Building Group. 
It has a well-established existing landscape feature being a hedge. It is appreciated that
this feature was not so established back in 2006 and 2009 when development on the plot
was last considered. However, that has changed markedly in the intervening 17 years,
and the plot is now considered compliant with guidance being surrounded by a mature
hedge that is the best part of 20 years old from when it was first planted. 
Visual Impact and Layout 
No comment. 
Drainage  
No comment.

Page 10

Flood Risk 
The Flood Risk Assessment clearly shows that the site can be developed. 
Access 
No comment. 
Ecology 
No comment. 
Developer Contributions 
A developer contribution is acceptable. 
Prime Agricultural Land 
No comment. 
Economic Impact 
The economic impact of the proposal has significance as a material consideration in that
it is highly likely that construction will be a by a local company employing local people. At
a time when construction jobs are being lost, particularly by smaller companies, and some
smaller construction companies are going out of business, it is important to allow for a
steady stream of these smaller sites that are the lifeblood of this part of the housebuilding
industry. 
The Scottish Government recognises the importance of SME housebuilders and
councillors are requested to consider the letter from the Cabinet Secretary for Housing
and Minister for Public Finance sent to planning authorities in October 2025
https://www.gov.scot/publications/housing-sme-homebuilders-ministerial-letter-october-
2025/ 
CONCLUSION 
The proposal complies with the Development Plan. This is a plot within a Building Group
that has a well-established, and defined, landscape boundary. 
However, if there is any doubt around that, for example councillors are persuaded by the
argument relating to the planning history, then material considerations justify overriding
the Development Plan as follows. 
• The planning history is 17 years old. That should carry no weight whatsoever.
• The hedge is now 17 years older.

Page 11

• There is a housing emergency Scotland-wide that should carry significant weight
in any decision on new housing, even just one house in the countryside, as
required by the Scottish Government.
• The economic benefit is more than the case officer implies given the need to
support local construction companies, and to support SME housebuilders as
requested by the Scottish Government. 
It is, therefore, respectfully requested that councillors allow this local review.

Page 12

Mr Stuart Heslop
c/o Houghton Planning Ltd
Paul Houghton MRTPI
Alloa Business Centre
Whins Road
Alloa
Clacks
FK10 3RF 
2 High Street
Perth
PH1 5PH 
Date of Notice :12th May 2026 
Town and Country Planning (Scotland) Act (as amended)
Planning, etc. (Scotland) Act 2006 (as amended) 
Application Reference: 26/00461/IPL 
I am directed by the Planning Authority under the Town and Country Planning
(Scotland) Acts currently in force, to refuse your application registered on 14th April
2026 for permission for Erection of dwellinghouse (in principle) Land 50 Metres
South East Of Craigburn House  Flawcraig  Rait  Perth  PH2 7RY  for the reasons
undernoted.   
Kristian Smith
Development Management & Building Standards Service Manager 
Reasons for Refusal 
1.   The proposal is contrary to Policy 19 Housing in the Countryside of the Perth and
Kinross Council Local Development Plan 2 (2019) and the associated Housing in
the Countryside Supplementary Guidance 2020 (SG).  Whilst the site is located
adjacent to a building group it cannot be considered to extend the group into a
definable site as the landscaping/hedging which has been planted along the
south-western boundary of the site has been planted with the sole purpose of
creating a development site.  The SG explicitly states that "fencing or young trees
or hedging planted with the specific intention of creating a site will not be
accepted as existing landscape features for the purposes of this Supplementary
Guidance".  The proposal also fails to meet any of the other categories of
development outlined in the SG.  The proposal is also contrary to Policy 9(b) of
National Planning Framework 4 (NPF4) as the proposal is on a greenfield site
and is not explicitly supported by policies of the Perth and Kinross Local
Development Plan 2 (2019).  The proposal also fails to meet any of the
categories of development allowed by Policy 17: Rural Homes of NPF4.

Page 13

2 
Justification 
1. The proposal is not in accordance with the Development Plan and there are
no material reasons which justify departing from the Development Plan. 
Notes 
The plans and documents which form part of this decision are listed below and
are displayed as ‘refused’ on Perth and Kinross Council’s website at
www.pkc.gov.uk “Online Planning Applications” page 
Plan Reference 
01
02
03
04
05 
Should you require further information regarding the decision please contact either
developmentmanagement@pkc.gov.uk or call 01738 475300, quoting the above
planning reference number, and you’ll be directed to the most appropriate person.

Page 14

REPORT OF HANDLING
DELEGATED REPORT
Ref No 26/00461/IPL
Ward No P1- Carse Of Gowrie
Due Determination Date 13th June 2026
Draft Report Date 12th May 2026
Report Issued by John Williamson Date 12 May 2026
PROPOSAL: Erection of dwellinghouse (in principle)
LOCATION: Land 50 Metres South East Of Craigburn House Flawcraig
Rait Perth PH2 7RY
SUMMARY:
This report recommends refusal of the application as the development is considered to
be contrary to the relevant provisions of the Development Plan and there are no
material considerations apparent which justify setting aside the Development Plan.
BACKGROUND AND DESCRIPTION OF PROPOSAL
Planning permission in principle is sought for the erection of a single dwellinghouse on
land located to the south‑east of Craigburn House and to the north‑east of the
settlement of Rait, as identified on the attached Location Plan and Proposed Indicative
Site Plan. The site is bounded by an existing access track along its south‑east and
north‑east boundaries, with the Craig Burn located on the far side of the access track to
the north‑east. A leylandii hedge forms the boundary to the south‑west, with Craigburn
House situated immediately to the north‑west. The application seeks to establish the
acceptability of the principle of residential development on this plot, with all detailed
matters reserved for future consideration. The proposal is assessed against the
Development Plan, comprising National Planning Framework 4 and the Perth and
Kinross Local Development Plan (2019), together with other relevant material
considerations, including site context, constraints and planning history.
The site has a relevant planning history, having previously been the subject of two
applications for residential development (06/00793/FUL and 09/00634/FUL), both of
which were refused by the Planning Authority and subsequently dismissed on appeal by
the Scottish Government. These decisions are material considerations in the
assessment of the current proposal. The site lies within the Sidlaw Hills Local

Page 15

Landscape Area and is located close to, though outwith, the Fingask Castle Historic
Garden and Designed Landscape, which is situated approximately 100 metres to the
north‑west.
SITE HISTORY
06/00793/FUL - Erection of 2 dwellinghouses – Refused August 2006 and Appeal
Dismissed by Scottish Government
09/00634/FUL – Erection of 2 dwellinghouses with integral garages – Refused July
2009 and Appeal Dismissed by Scottish Government
PRE-APPLICATION CONSULTATION
Pre application Reference: 25/00061/PREAPL
DEVELOPMENT PLAN
The Development Plan for the area comprises National Planning Framework 4 (NPF4)
and the Perth and Kinross Local Development Plan 2 (2019) (LDP2).
National Planning Framework 4
The National Planning Framework 4 (NPF4) is the Scottish Government’s long-term
spatial strategy with a comprehensive set of national planning policies. This strategy
sets out how to improve people’s lives by making sustainable, liveable and productive
spaces.
NPF4 was adopted on 13 February 2023. NPF4 has an increased status over previous
NPFs and comprises part of the statutory development plan.
The Council’s assessment of this application has considered the following policies of
NPF4:
Policy 3: Biodiversity
Policy 4: Natural Places
Policy 6: Forestry, Woodland and Trees
Policy 13: Sustainable Transport
Policy 14: Design, Quality and Place

Page 16

Policy 16: Quality Homes
Policy 17: Rural Homes
Policy 18: Infrastructure First
Policy 22: Flood Risk and Water Management
Perth and Kinross Local Development Plan 2 – Adopted November 2019
The Local Development Plan 2 (LDP2) is the most recent statement of Council policy
and is augmented by Supplementary Guidance.
The principal policies are:
Policy 1A: Placemaking
Policy 1B: Placemaking
Policy 5: Infrastructure Contributions
Policy 19: Housing in the Countryside
Policy 39: Landscape
Policy 40B: Forestry, Woodland and Trees: Trees, Woodland and Development
Policy 41: Biodiversity
Policy 52: New Development and Flooding
Policy 53B: Water Environment and Drainage: Foul Drainage
Policy 53C: Water Environment and Drainage: Surface Water Drainage
Policy 60B: Transport Standards and Accessibility Requirements: New Development
Proposals
Statutory Supplementary Guidance
 Supplementary Guidance - Airfield Safeguarding (adopted in 2020)
 Supplementary Guidance - Delivering Zero Waste (adopted in 2020)
 Supplementary Guidance - Developer Contributions & Affordable Housing
(adopted in 2020)

Page 17

 Supplementary Guidance - Flood Risk and Flood Risk Assessments (adopted
in 2021)
 Supplementary Guidance - Forest & Woodland Strategy (adopted in 2020)
 Supplementary Guidance - Green & Blue Infrastructure (adopted in 2020)
 Supplementary Guidance - Housing in the Countryside (adopted in 2020)
 Supplementary Guidance - Landscape (adopted in 2020)
 Supplementary Guidance - Placemaking (adopted in 2020)
OTHER MATERIAL CONSIDERATIONS
Non-Statutory Guidance
 Planning Guidance - Planning & Biodiversity
 Supplementary Guidance - Renewable & Low Carbon Energy (draft)
National Guidance
The Scottish Government expresses its planning policies through, Planning Advice
Notes, Creating Places, Designing Streets, National Roads Development Guide and a
series of Circulars.
National Roads Development Guide 2014
This document supports Designing Streets and expands on its principles and is
considered to be the technical advice that should be followed in designing and
approving of all streets including parking provision.
Local Place Plans
Local Place Plans are community-led plans setting out proposals for the development
and use of land and set out a community’s aspirations for its future development. There
is no Local Place Plan for this site.
CONSULTATION RESPONSES
EXTERNAL
Scottish Water – no objection
Perth And Kinross Heritage Trust – no objection
INTERNAL

Page 18

Transportation And Development – no objection subject to conditions
Development Contributions Officer – condition recommended to require compliance
with infrastructure contributions policy
Structures And Flooding – no comments
REPRESENTATIONS
Number of representations received: 2
The letters of representation both object to the application and the comments may be
summarised as follows:
 Contrary to Development Plan
 Planning history of refusal and appeal dismissal
 Prime agricultural land
 Manipulated and engineered site due to hedge planting
 Setting of precedent
 Traffic and access safety
The comments above are addressed within the appraisal section below.
Additional Statements Received:
Screening Opinion Not Required
Environmental Impact Assessment (EIA):
Environmental Report
Not applicable
Appropriate Assessment under Habitats
Regulations
Habitats Regulations AA
Not Required
Design Statement or Design and Access
Statement
Not Required
Report on Impact or Potential Impact eg Flood
Risk Assessment
Submitted
APPRAISAL
Sections 25 and 37 (2) of the Town and Country Planning (Scotland) Act 1997 require
that planning decisions be made in accordance with the development plan unless
material considerations indicate otherwise. The Development Plan comprises NPF4

Page 19

and the Perth and Kinross Local Development Plan 2019. The relevant policy
considerations are outlined in the policy section above and are considered in more
detail below. In terms of other material considerations, involving considerations of the
Council’s other approved policies and supplementary guidance, these are discussed
below only where relevant.
The determining issues in this case are whether; the proposal complies with
development plan policy; or if there are any other material considerations which justify a
departure from policy.
Principle
The principle of development on this site was addressed in detail within the Council’s
pre‑application response (ref. 25/00061/PREAPL) dated 12 May 2025, and the
assessment below is consistent with that advice. The proposal has been considered
against the Development Plan, comprising National Planning Framework 4 (NPF4) and
the Perth and Kinross Local Development Plan 2019 (LDP2), together with the
associated Supplementary Guidance.
Policy 19 of the LDP2 (Housing in the Countryside) acknowledges that opportunities
exist for new housing in rural areas where this supports the viability of communities,
meets identified development needs in appropriate locations and safeguards the
character of the countryside through a high standard of siting and design. The policy
supports the development of single houses or groups of houses where proposals fall
within one of six defined categories. This approach is reflected in NPF4, where Policy 9
supports development on greenfield land only where this is explicitly supported by
policies in the Local Development Plan. NPF4 Policy 17 is also relevant and seeks to
support rural housing where it is appropriately located and meets specified criteria.
In this instance, the only category within Policy 19 which may be applicable is Category
1 – Building Groups. The proposal does not represent an infill site, does not fall within
the defined site categories set out in the Supplementary Guidance, does not involve the
renovation or replacement of an existing building or the conversion of a redundant
non‑domestic building, and the site does not meet the definition of rural brownfield land.
The Housing in the Countryside Supplementary Guidance (adopted 2020) clarifies that
a building group is defined as three or more existing buildings of a size at least
equivalent to a traditional cottage which appear as a group within their landscape
setting, with the majority of buildings being residential or capable of conversion to
residential use. The guidance allows for development which extends a building group
into a readily definable adjacent site, formed by existing topography, roads or
well‑established landscape features such as a watercourse or mature tree belt. It also
requires that new housing respects the character, scale and form of the existing group
and is integrated into the existing layout and building pattern.
While the buildings adjacent to the site are considered, in isolation, to meet the

Page 20

definition of a building group, the critical issue is whether the application site itself
constitutes a readily definable site for the purposes of the Supplementary Guidance.
This matter has been examined previously through two planning applications on the site
(06/00793/FUL and 09/00634/FUL), both of which were refused and subsequently
dismissed on appeal by the Scottish Government.
The appeal decision for application 06/00793/FUL concluded that, although the site was
bounded by a driveway and woodland to the east, there were no established landscape
features along the south‑west boundary to define the site. The subsequent application
in 2009 (09/00634/FUL) was refused on similar grounds, with the Reporter concluding
that the site did not represent an identifiable site formed by landscape features and that
the Housing in the Countryside policy does not support sites created through artificial
boundaries.
It is noted that the Council’s updated Housing in the Countryside Supplementary
Guidance (2025) retains the same core principles, including the requirement that sites
extending building groups must be defined by landscape features or topography and
must not be artificially created. The current guidance explicitly states:
“Fencing or young trees or hedging planted with the specific intention of creating a site
will not be accepted as existing landscape features for the purposes of this
Supplementary Guidance”.
Review of historic and more recent imagery indicates that the hedge along the
south‑west boundary of the site was planted shortly before the determination of the
2009 application. In the view of the Planning Authority, and consistent with the previous
appeal decisions, this hedge was planted with the intention of creating a development
plot artificially and cannot be relied upon as a defining landscape feature. The passage
of time does not alter its artificial origin for the purposes of policy assessment.
Accordingly, as advised in the pre‑application response dated 12 May 2025, the site is
not considered to comprise a definable site for the extension of a building group under
Policy 19 and its associated Supplementary Guidance as it has been created artificially.
The proposal therefore fails to meet the requirements of the Local Development Plan.
As NPF4 supports greenfield development only where it accords with relevant LDP
policies, the proposal is also contrary to national policy. The previous appeal decisions
represent a material consideration, and no substantive change in policy or site
circumstances has been identified which would justify a different conclusion in this case.
Visual Impact and Layout
Generally, the design and scale of development should respect its surroundings and
adhere to Policies 1A and B of LDP2 which relate to placemaking and Policy 14 of
NPF4 which seeks to deliver well designed development. Further guidance is also
provided within the associated Placemaking Supplementary Guidance. The proposal
also requires the landscape character of Local Landscape Area and meet the

Page 21

requirements of Policy 39 of the LDP2. Policy 4(a) of NPF4 is also applicable and
seeks to ensure that the development does not have an unacceptable impact on the
natural environment.
As this is an application in principle this detail cannot be assessed at this stage.
Drainage
The application form indicates that the site is to connect to a private drainage system
with surface water system catered for through a SUDS system. This is in accordance
with Policy 53B and C of the LDP2 and Policy 22 of NPF4. The proposed introduction
of a sustainable urban drainage system is considered to be sufficient to cater for
surface water drainage at the site.
The proposed development is supported by a Drainage Impact Assessment which
confirms that surface water will be managed on site in accordance with Policy 53C of
the Perth and Kinross Local Development Plan (2019) and Policy 22 of National
Planning Framework 4, through the use of an infiltration‑based Sustainable Drainage
System. Surface water runoff from roof areas is to be directed to a soakaway designed
to accommodate a 1 in 200 year rainfall event with an allowance for climate change. In
accordance with Policy 53B, foul drainage is to be addressed by a private secondary
treatment system, with treated effluent discharged to ground via a soakaway, reflecting
the absence of a public sewer connection. Subject to final detailed design and
regulatory approvals, the proposed drainage arrangements are considered acceptable
in principle.
Flood Risk
The application site is identified on SEPA’s indicative Flood Maps as being subject to
medium to high likelihood fluvial flooding from the Craig Burn. This mapping therefore
indicates the site to be potentially at risk of flooding for the purposes of Policy 22 of
National Planning Framework 4. However, the applicant has submitted a site‑specific
Flood Risk Assessment (dated 30 March 2026) which undertakes a detailed technical
evaluation of flood risk, including a screening assessment, peak flow calculations
incorporating climate change allowances, bridge capacity analysis and channel capacity
assessment of the Craig Burn. The Flood Risk Assessment concludes that the Craig
Burn has sufficient capacity to convey the design flood event (200‑year plus climate
change) and that no flooding within the site boundary is predicted. On this basis, the
residual flood risk to the site is assessed as low, and the development is not considered
to be located within a “flood risk area” as defined by NPF4 Policy 22. While SEPA’s
flood mapping represents a precautionary, strategic‑level assessment, the site‑specific
technical evidence is considered to provide a more accurate representation of flood risk
at this location. Subject to the conclusions of this assessment being accepted, and the
implementation of recommended freeboard levels, it is therefore considered that the

Page 22

proposal could comply with national and local flood risk policy requirements.
Access
The site is served by an existing private access lane. In accordance with Policy 60B of
the Perth and Kinross Local Development Plan (2019), Policy 13 of National Planning
Framework 4 and the National Roads Development Guide, development is required to
demonstrate that safe and suitable access arrangements can be achieved. Transport
Planning has confirmed that, in principle, the use of the existing private lane to serve
the proposed single dwelling is acceptable and no objection has been raised to the
proposal at this stage. The detailed design of the access, including any requirements
relating to visibility, surface treatment and turning provision, would be secured by
planning condition and would require to be submitted for approval as part of any
subsequent detailed application.
Ecology
The application site currently comprises managed grassland with no evidence of priority
habitats, mature trees or features of ecological significance, and is therefore considered
to be of limited ecological value. Having regard to Policy 41 of the Perth and Kinross
Local Development Plan (2019) and Policy 3 of National Planning Framework 4, which
seek to safeguard and enhance biodiversity, it is not considered that the proposed
development would result in any significant adverse impacts on habitats or protected
species. On this basis, and given the nature and condition of the site, an ecological
assessment is not required to support the application.
Developer Contributions
The Council Developer Contributions Supplementary Guidance requires a financial
contribution towards increased primary school capacity in areas where a primary school
capacity constraint has been identified. A capacity constraint is defined as where a
primary school is operating at over 80% and is likely to be operating following
completion of the proposed development, extant planning permissions and Local
Development Plan allocations, at or above 100% of total capacity.
This proposal is within the catchment of Abernyte Primary School and the requirement
for a developer contribution can be secured by condition and considered further at the
detailed application stage.
Prime Agricultural Land

Page 23

The Land Capability for Agriculture mapping identifies the site as Class 3.1 agricultural
land. Policy 5 of National Planning Framework 4 seeks to protect prime agricultural
land, which includes Classes 1, 2 and 3.1; however, particular emphasis is placed on
safeguarding Class 1 and Class 2 land, which represent the best and most versatile
agricultural resources capable of producing a wide range of crops. While Class 3.1 land
is technically classified as prime agricultural land, it is of a lower quality than Classes 1
and 2 and is afforded a lesser degree of protection in planning terms. In this case, the
proposal affects only a small area of Class 3.1 land when considered in the context of
the extensive agricultural landholding and wider farmland resource in the surrounding
area, and does not involve the loss of the highest quality agricultural land. On this basis,
the impact on agricultural land is not considered to present a determining constraint in
the assessment of the proposal against NPF4 Policy 5.
Economic Impact
The economic impact of the proposal is likely to be minimal and limited to the
construction phase of the development.
PLANNING OBLIGATIONS AND LEGAL AGREEMENTS
None required.
DIRECTION BY SCOTTISH MINISTERS
None applicable to this proposal.
CONCLUSION AND REASONS FOR DECISION
To conclude, the application must be determined in accordance with the Development
Plan unless material considerations indicate otherwise. In this respect, the proposal is
considered to be contrary to the Development Plan. Account has been taken of the
relevant material considerations and none has been found that would justify overriding
the Development Plan.
Accordingly, the proposal is refused on the grounds identified below.
Reason for Refusal
1 The proposal is contrary to Policy 19 Housing in the Countryside of the Perth and
Kinross Council Local Development Plan 2 (2019) and the associated Housing in the

Page 24

Countryside Supplementary Guidance 2020 (SG). Whilst the site is located adjacent to
a building group it cannot be considered to extend the group into a definable site as the
landscaping/hedging which has been planted along the south-western boundary of the
site has been planted with the sole purpose of creating a development site. The SG
explicitly states that "fencing or young trees or hedging planted with the specific
intention of creating a site will not be accepted as existing landscape features for the
purposes of this Supplementary Guidance". The proposal also fails to meet any of the
other categories of development outlined in the SG. The proposal is also contrary to
Policy 9(b) of National Planning Framework 4 (NPF4) as the proposal is on a greenfield
site and is not explicitly supported by policies of the Perth and Kinross Local
Development Plan 2 (2019). The proposal also fails to meet any of the categories of
development allowed by Policy 17: Rural Homes of NPF4.
Justification
The proposal is not in accordance with the Development Plan and there are no material
reasons which justify departing from the Development Plan.
Informatives
None
Procedural Notes
Not Applicable.
PLANS AND DOCUMENTS RELATING TO THIS DECISION
01
02
03
04
05

Page 25

Page 1 of 9
Pullar House 35 Kinnoull Street Perth PH1 5GD  Tel: 01738 475300  Email: onlineapps@pkc.gov.uk
Applications cannot be validated until all the necessary documentation has been submitted and the required fee has been paid.
Thank you for completing this application form:
ONLINE REFERENCE 100749913-001
The online reference is the unique reference for your online form only. The  Planning Authority will allocate an Application Number when
your form is validated. Please quote this reference if you need to contact the planning Authority about this application.
Type of Application
What is this application for? Please select one of the following: *
  Application for planning permission (including changes of use and surface  mineral working).
  Application for planning permission in principle.
  Further application, (including renewal of planning permission, modification, variation or removal of a planning condition etc)
  Application for Approval of Matters specified in conditions.
Description of Proposal
Please describe the proposal including any change of use: *  (Max 500 characters)
Is this a temporary permission? *  Yes   No
If a change of use is to be included in the proposal has it already taken place?  Yes   No
(Answer ‘No’ if there is no change of use.) *
Has the work already been started and/or completed? *
 No   Yes – Started   Yes - Completed
Applicant or Agent Details
Are you an applicant or an agent? * (An agent is an architect, consultant or someone else acting
on behalf of the applicant in connection with this application)  Applicant  Agent
Dwellinghouse

Page 26

Page 2 of 9
Agent Details
Please enter Agent details
Company/Organisation:
Ref. Number: You must enter a Building Name or Number, or both: *
First Name: * Building Name:
Last Name: * Building Number:
Address 1
Telephone Number: * (Street): *
Extension Number: Address 2:
Mobile Number: Town/City: *
Fax Number: Country: *
Postcode: *
Email Address: *
Is the applicant an individual or an organisation/corporate entity? *
  Individual    Organisation/Corporate entity
Applicant Details
Please enter Applicant details
Title: You must enter a Building Name or Number, or both: *
Other Title: Building Name:
First Name: * Building Number:
Address 1
Last Name: * (Street): *
Company/Organisation Address 2:
Telephone Number: * Town/City: *
Extension Number: Country: *
Mobile Number: Postcode: *
Fax Number:
Email Address: *
Houghton Planning Ltd
Mr
Paul
Stuart
Houghton MRTPI
Heslop
Whins Road
Alloa Business Centre
FK10 3RF
Scotland
Clacks
Alloa

Page 27

Page 3 of 9
Site Address Details
Planning Authority:
Full postal address of the site (including postcode where available):
Address 1: 
Address 2:
Address 3:
Address 4:
Address 5:
Town/City/Settlement:
Post Code:
Please identify/describe the location of the site or sites
Northing Easting
Pre-Application Discussion
Have you discussed your proposal with the planning authority? *  Yes   No
Pre-Application Discussion Details Cont.
In what format was the feedback given? *
 Meeting  Telephone  Letter  Email
Please provide a description of the feedback you were given and the name of the officer who provided this feedback. If a processing
agreement [note 1] is currently in place or if you are currently discussing a processing agreement with the planning authority, please
provide details of this. (This will help the authority to deal with this application more efficiently.) * (max 500 characters)
Title: Other title:
First Name: Last Name:
Correspondence Reference Date (dd/mm/yyyy):
Number:
Note 1. A Processing agreement involves setting out the key stages involved in determining a planning application, identifying what
information is required and from whom and setting timescales for the delivery of various stages of the process.
.
Mr
Perth and Kinross Council
John
25/00061/PREAPL
Williamson
12/05/2025
Land 50 metres South East of Craigburn House, Flawcraig, Rait, Perth, PH2 7RY

Page 28

Page 4 of 9
Site Area
Please state the site area:
Please state the measurement type used:  Hectares (ha)   Square Metres (sq.m)
Existing Use
Please describe the current or most recent use: *  (Max 500 characters)
Access and Parking
Are you proposing a new altered vehicle access to or from a public road? *  Yes   No
If Yes please describe and show on your drawings the position of any existing. Altered or new access points, highlighting the changes
you propose to make. You should also show existing footpaths and note if there will be any impact on these.
Are you proposing any change to public paths, public rights of way or affecting any public right of access? *  Yes   No
If Yes please show on your drawings the position of any affected areas highlighting the changes you propose to make, including
arrangements for continuing or alternative public access.
Water Supply and Drainage Arrangements
Will your proposal require new or altered water supply or drainage arrangements? *  Yes   No
Are you proposing to connect to the public drainage network (eg. to an existing sewer)? *
  Yes – connecting to public drainage network
  No – proposing to make private drainage arrangements
  Not Applicable – only arrangements for water supply required
As you have indicated that you are proposing to make private drainage arrangements, please provide further details.
What private arrangements are you proposing? *
 New/Altered septic tank.
 Treatment/Additional treatment (relates to package sewage treatment plants, or passive sewage treatment such as a reed bed).
 Other private drainage arrangement (such as chemical toilets or composting toilets).
Please explain your private drainage arrangements briefly here and show more details on your plans and supporting information: *
0.20
Vacant ground.
See Drainage Impact Assessment

Page 29

Page 5 of 9
Do your proposals make provision for sustainable drainage of surface water?? *  Yes   No
(e.g. SUDS arrangements) *
Note:-
Please include details of SUDS arrangements on your plans
Selecting ‘No’ to the above question means that you could be in breach of Environmental legislation.
Are you proposing to connect to the public water supply network? *
  Yes
  No, using a private water supply
  No connection required
If No, using a private water supply, please show on plans the supply and all works needed to provide it (on or off site).
Assessment of Flood Risk
Is the site within an area of known risk of flooding? *  Yes    No   Don’t Know
If the site is within an area of known risk of flooding you may need to submit a Flood Risk Assessment before your application can be
determined. You may wish to contact your Planning Authority or SEPA for advice on what information may be required.
Do you think your proposal may increase the flood risk elsewhere? *  Yes    No   Don’t Know
Trees
Are there any trees on or adjacent to the application site? *  Yes   No
If Yes, please mark on your drawings any trees, known protected trees and their canopy spread close to the proposal site and indicate if
any are to be cut back or felled.
All Types of Non Housing Development – Proposed New Floorspace
Does your proposal alter or create non-residential floorspace? *  Yes   No
Schedule 3 Development
Does the proposal involve a form of development listed in Schedule 3 of the Town and Country  Yes   No   Don’t Know
Planning (Development Management Procedure (Scotland) Regulations 2013 *
If yes, your proposal will additionally have to be advertised in a newspaper circulating in the area of the development. Your planning
authority will do this on your behalf but will charge you a fee. Please check the planning authority’s website for advice on the additional
fee and add this to your planning fee.
If you are unsure whether your proposal involves a form of development listed in Schedule 3, please check the Help Text and Guidance
notes before contacting your planning authority.
Planning Service Employee/Elected Member Interest
Is the applicant, or the applicant’s spouse/partner, either a member of staff within the planning service or an  Yes    No
elected member of the planning authority? *

Page 30

Page 6 of 9
Certificates and Notices
CERTIFICATE AND NOTICE UNDER REGULATION 15 – TOWN AND COUNTRY PLANNING (DEVELOPMENT MANAGEMENT
PROCEDURE) (SCOTLAND) REGULATION 2013
One Certificate must be completed and submitted along with the application form. This is most usually Certificate A, Form 1,
Certificate B, Certificate C or Certificate E.
Are you/the applicant the sole owner of ALL the land? *  Yes    No
Is any of the land part of an agricultural holding? *  Yes    No
Are you able to identify and give appropriate notice to ALL the other owners? *   Yes    No
Certificate Required
The following Land Ownership Certificate is required to complete this section of the proposal:
Certificate B
Land Ownership Certificate
Certificate and Notice under Regulation 15 of the Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013
I hereby certify that
(1) - No person other than myself/the applicant was an owner [Note 4] of any part of the land to which the application relates at the
beginning of the period of 21 days ending with the date of the accompanying application;
or –
(1) - I have/The Applicant has served notice on every person other than myself/the applicant who, at the beginning of the period of 21
days ending with the date of the accompanying application was owner [Note 4] of any part of the land to which the application relates.
Name:
Address:
Date of Service of Notice: *
Morris Leslie PartnershipFirst Floor, South Inch Business Park, Shore Road, Perth, Scotland, PH2 8BW
02/04/2026

Page 31

Page 7 of 9
(2) - None of the land to which the application relates constitutes or forms part of an agricultural holding;
or –
(2) - The land or part of the land to which the application relates constitutes or forms part of an agricultural holding and I have/the
applicant has served notice on every person other than myself/himself who, at the beginning of the period of 21 days ending with the
date of the accompanying application was an agricultural tenant.  These persons are:
Name:
Address:
Date of Service of Notice: *
Signed: Paul Houghton MRTPI
On behalf of: Mr Stuart Heslop
Date: 02/04/2026
 Please tick here to certify this Certificate. *
Checklist – Application for Planning Permission
Town and Country Planning (Scotland) Act 1997
The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013
Please take a few moments to complete the following checklist in order to ensure that you have provided all the necessary information
in support of your application. Failure to submit sufficient information with your application may result in your application being deemed
invalid. The planning authority will not start processing your application until it is valid.
a) If this is a further application where there is a variation of conditions attached to a previous consent, have you provided a statement to
that effect? *
 Yes   No   Not applicable to this application
b) If this is an application for planning permission or planning permission in principal where there is a crown interest in the land, have
you provided a statement to that effect? *
 Yes   No   Not applicable to this application
c) If this is an application for planning permission, planning permission in principle or a further application and the application is for
development belonging to the categories of national or major development (other than one under Section 42 of the planning Act), have
you provided a Pre-Application Consultation Report? *
 Yes   No   Not applicable to this application

Page 32

Page 8 of 9
Town and Country Planning (Scotland) Act 1997
The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013
d) If this is an application for planning permission and the application relates to development belonging to the categories of national or
major developments and you do not benefit from exemption under Regulation 13 of The Town and Country Planning (Development
Management Procedure) (Scotland) Regulations 2013, have you provided a Design and Access Statement? *
 Yes   No   Not applicable to this application
e) If this is an application for planning permission and relates to development belonging to the category of local developments (subject
to regulation 13. (2) and (3) of the Development Management Procedure (Scotland) Regulations 2013) have you provided a Design
Statement? *
 Yes   No   Not applicable to this application
f) If your application relates to installation of an antenna to be employed in an electronic communication network, have you provided an
ICNIRP Declaration? *
 Yes   No   Not applicable to this application
g) If this is an application for planning permission, planning permission in principle, an application for approval of matters specified in
conditions or an application for mineral development, have you provided any other plans or drawings as necessary:
  Site Layout Plan or Block plan.
  Elevations.
  Floor plans.
  Cross sections.
  Roof plan.
  Master Plan/Framework Plan.
  Landscape plan.
  Photographs and/or photomontages.
  Other.
If Other, please specify: *  (Max 500 characters)
Provide copies of the following documents if applicable:
A copy of an Environmental Statement. *  Yes   N/A
A Design Statement or Design and Access Statement. *  Yes   N/A
A Flood Risk Assessment. *  Yes   N/A
A Drainage Impact Assessment (including proposals for Sustainable Drainage Systems). *  Yes   N/A
Drainage/SUDS layout. *  Yes   N/A
A Transport Assessment or Travel Plan  Yes   N/A
Contaminated Land Assessment. *  Yes   N/A
Habitat Survey. *  Yes   N/A
A Processing Agreement. *  Yes   N/A
Other Statements (please specify). (Max 500 characters)

Page 33

Page 9 of 9
Declare – For Application to Planning Authority
I, the applicant/agent certify that this is an application to the planning authority as described in this form. The accompanying
Plans/drawings and additional information are provided as a part of this application.
Declaration Name: Mr Paul Houghton MRTPI
Declaration Date: 02/04/2026
Payment Details
Pay Direct     
Created: 02/04/2026 10:02

Page 34

Location of application site

Page 35

Land 50 metres South East of Craigburn House, Flawcraig, Rait,
PH2 7RY
© Crown copyright and database rights 2026 OS 100054135. Map area bounded by: 323143,727035
323543,727435. Produced on 01 April 2026 from the OS National Geographic Database. Supplied by
UKPlanningMaps.com. Unique plan reference: p16g/uk/1400496/1875765

Page 36

Legend
SiteBoundary
Proposedsingledwellinghouse
Proposeddrivewayand2no.
parkingspaces
Craigburn House
North Lodge
Springside Cottage
FB
Witches Knowe
Scale: 1:500@A1/1:1,000@A3
DrawingNo: CRA-HP-SP-01
Drawnby: LHoughton
Date: 28/03/2026
Status: Planning
Checkedby: PHoughton
DrawingTitle:
SitePlan
Project:LandSEofCraigburnHouse,
Flawcraig,Rait,Perth,PH27RY
Client:
StuartHeslop
t:07780117708 e:houghtonplanning.co.uk
0 10 20 30 40 50m

Page 37

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – FRA| 30/03/2026
Registered Company No. SC706920
1
Craigburn House, Rait – Proposed
Residential Development
Flood Risk Assessment  
Client: Stuart Heslop
Project/Proposal No: GON.694.0406
Version: 2
Date: 30/03/2026

Page 38

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – FRA| 30/03/2026
Registered Company No. SC706920
2
Document Information
Project Name: Craigburn House, Rait – Proposed Residential Development
Document Title: Flood Risk Assessment
Client Name: Stuart Heslop
Document Status: Final for Issue
Author: Duncan Bowie
Reviewed: Zak Ritchie
Approved: Zak Ritchie
Approver Qualifications: BEng(hons), MSc, C.WEM, C.Eng, MCIWEM
Date: 30/03/2026
Version: 2
Project/Proposal Number: GON.694.0406  
Revision History
Version Date Authored Reviewed Approved Notes
1 22/04/2025 Duncan Bowie Zak Ritchie Zak Ritchie For Issue
2 30/03/2026 Duncan Bowie Zak Ritchie Zak Ritchie Revised Issue                   
The contents of this document are confidential to the addressed recipient and may not be revealed. This
document may contain confidential information. If received in error, please delete it without making or distributing
copies. Opinions and information that do not relate to the official business of Gondolin Land and Water Ltd,
registered at 35/1 Balfour Street, EH6 5DL, are not endorsed by the company. 
Limitation: This document has been prepared exclusively for the use of the Client and any party with whom a
warranty agreement has been executed, or an assignment has been agreed. No other parties may rely on the
contents of this document without written approval from Gondolin Land and Water Ltd for which a payment may
be applicable. Gondolin Land and Water Ltd accepts no responsibility or liability for the consequences of use of
this document for any purpose other than that for which it was authorised, nor the use of this document by any
third party with whom an agreement has not been reached. 
© Copyright 2026 Gondolin Land and Water Ltd. The concepts and information contained in this document are
the property of the company. Use or copying of this document in whole or in part without the written permission
of Gondolin Land and Water Ltd constitutes an infringement of copyright unless otherwise explicitly agreed by
contract.

Page 39

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – FRA| 30/03/2026
Registered Company No. SC706920
3
Contents
Document Information 2
Contents 3
1. Introduction 5
1.1 Preamble 5
1.2 Site Context and Proposed Development 5
1.3 Topography 5
1.4 Geology and Hydrogeology 5
1.5 Local Hydrology 6
2. Planning & Policy Context 6
2.1 Overview 6
2.2 National Planning Policy 7
2.3 SEPA Flood Risk and Land Use Vulnerability Guidance 8
2.4 SEPA Flood Risk Classifications 8
2.5 Proposed Development Suitability 8
3. Flood Risk Assessment 9
3.1 Screening Assessment of Potential Source of Flood Risk 9
3.2 Climate Change 11
4. Technical Fluvial Flood Risk Assessment 12
4.1 Context 12
4.2 Craig Burn Peak Flow Assessment 12
4.3 Bridge Capacity Assessment 13
4.4 Channel Capacity Assessment 14
4.5 Fluvial Flood Risk Summary 14
4.6 Recommendations 15
5. Closure 15

Page 40

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – FRA| 30/03/2026
Registered Company No. SC706920
4
Document References
Tables
Table 1  Catchment Hydrological Summary ................................................................................................ 6
Table 2 Flood Risk Screening Assessment ................................................................................................... 11
Table 3 Craig Burn Peak Flow Summary ..................................................................................................... 12
Table 4 Bridge Capacity Assessment .......................................................................................................... 13
Table 5 Manning’s Equation Channel Capacity Summary ...................................................................... 14
Appendices
Appendix A – PKC Certification and SEPA Checklist
Appendix B – Peak Flow Analysis
Appendix C – Scottish Water Asset Plans
Appendix D – Site Photography
Drawings 
Drawing FRA-001 – Site Location Plan
Drawing FRA-002 – Flood Risk Summary

Page 41

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – FRA| 30/03/2026
Registered Company No. SC706920
5
1. Introduction
1.1 Preamble
Gondolin Land and Water Ltd (Gondolin) has been appointed by Mr Stuart Heslop (the Client) to
prepare a Flood Risk Assessment (FRA) report in support of a planning application for the
development of a dwelling house and associated works on land at Craigburn House, Fingask, Rait,
Perth & Kinross, PH2 7RU. 
This report addresses any potential flood risk to the proposed development from all possible sources
in accordance with best practice and in accordance with policies presented by the National
Planning Framework for Scotland 4 (NPF4)1 and Perth and Kinross Councill2. A signed compliance
certificate is included in Appendix A, to certify that this assessment has been carried out in
accordance with the relevant guidance and legislation. A completed SEPA FRA checklist is also
included within Appendix A. 
The site was visited in January 2025 by a suitably qualified Hydrologist / Civil Engineer to inform the
assessment and assessment overseen by a Chartered Hydrologist / Civil Engineer with >14 years
experience of undertaking FRAs in Scotland.
1.2 Site Context and Proposed Development
The development site is located to the south of the existing Craigburn properties at approximate
National Grid Reference (NGR): NO 23331 27173. The proposals are for a single residential dwelling on
a 0.13ha plot in the east of the site neighbouring the existing properties. This plot is part of the wider
0.97ha site. There are no current proposals for this area. However, it will be included in this FRA for
completeness.
The site is bounded by the existing Craigburn properties to the north, a minor road to the northwest
and agricultural land on all other sides. Access is provided from the existing track bounding the site
to the northeast or from the minor road in the west. The site currently consists of improved grassland
surrounded by large hedges. 
A site location plan is included as Drawing FRA-001.
1.3 Topography
An assessment of site topography has been undertaken using 1m resolution LiDAR data sourced
from the Scottish Remote Sensing Portal in conjunction with on-site observations and measurements.
The site slopes down to the south at an approximate gradient of 1 in 15. The maximum
elevation of 20.5mAOD is located in the north next to the existing public road and the
approximate minimum elevation of 14.8mAOD is found at the southern extent. 
1.4 Geology and Hydrogeology
1.4.1 Geology
1.4.1.1 Superficial
Review of the British Geological Survey3 (BGS) online geology maps indicates that superficial
deposits at the proposed development site are Glaciofluvial Ice Contact Deposits of gravel, sand
and silt. The area around the site takes the appearance of an Alluvial Fan, formed on the Carse of
Gowrie around the apex of the constricted upstream channel of the Craig Burn. 
1 The Scottish Government (2023) National Planning Framework 4, February 2023
2 Perth & Kinross Council (2021) Flood Risk and Flood Risk Assessments
3 British Geological Survey (2025) Natural Environment Research Council – GeoIndex Onshore Viewer, available at:
https://www.bgs.ac.uk/map-viewers/geoindex-onshore/ (accessed on 20th February 2025)

Page 42

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – FRA| 30/03/2026
Registered Company No. SC706920
6
1.4.1.2 Bedrock
Review of the BGS online geology maps shows that the bedrock geology at the development area
is of the Glenvale Sandstone Formation. Brown, yellow, read, purple and cream feldspathic
sandstones of the Devonian Epoch. Approximately 30m upgradient to the northwest, the bedrock
transitions to andesite and pyroxene of the Ochil Volcanic Formation. 
1.4.2 Hydrogeology
Review of the BGS online hydrogeology maps indicates that the underlying bedrock at the
development area is of the Stratheden Group and hence is a moderately productive aquifer with
Sandstone, partly pebbly with subordinate siltstone and mudstone producing moderate amounts of
groundwater through intergranular flow. 
1.5 Local Hydrology
Review of the Flood Estimation Handbook (FEH) Web Service4 and other available mapping shows
that the Craig Burn passes the site approximately 10m to the northeast of the development boundary.
The FEH Web Service provides a catchment of 5.61km2 for the Craig Burn where it passes the
development site.  During the site hydrological survey, relevant site observations and measurements
were taken of the Craig Burn, flood flow paths and other relevant information pertinent to this study.
It was observed that the burn had been artificially straightened and deepened as is typical for ‘pow’
watercourses in the Gowrie region. 
No other open watercourses are recorded within the vicinity of the proposed development area. 
A hydrological summary and characteristics for the Craig Burn catchment at the development site
are shown in Table 1 below. The data shown is taken from the FEH Web Service and the catchment
characteristics of the site have been delineated from NGR: NO 23400 27200, a point in the
watercourse immediately adjacent to the site. 
Table 1  Catchment Hydrological Summary 
Waterbody
Catchment
Area
(km2)
SAAR1
(mm)
URBEXT2
(%) PROPWET3 SPRHOST4
(%)
ALTBAR5
(m)
Craig Burn 5.61 771 0 0.46 29.68 200
1SAAR = Standard Annual Average Rainfall between 1961-1990
2URBEXT = Extent of Urban and Suburban Land Cover (1990)
3PROPWET = Proportion of Time the Soil Moisture Deficit (SMD) was equal to, or below, 6mm during 1961-1990
4SPRHOST = Standard Percentage Runoff using UK Hydrology of Soil Types (HOST) Classification 
5ALTBAR = Mean Catchment Altitude
The FEH data indicates that the Craig Burn catchment experiences a moderate SAAR value for a
Scottish catchment and that the catchment is essentially rural. An SPRHOST value of 29.68% indicates
a low-moderate runoff potential. 
2. Planning & Policy Context
2.1 Overview
This assessment has been completed in accordance with guidance presented within the National
Planning Framework for Scotland 4 (NPF4) and taking cognisance of the Flood Risk Management
(Scotland) Act 2009. 
The assessment also references and takes due consideration (where appropriate) of the following
principal guidance and policy documents:
 CIRIA (2004) Development and Flood Risk – Guidance for the Construction Industry, Report
C624; 
4 UK Centre for Ecology and Hydrology (2025) Flood Estimation handbook Web Service, available at: https://fehweb.ceh.ac.uk/
(accessed on 27th February 2025)

Page 43

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – FRA| 30/03/2026
Registered Company No. SC706920
7
 Perth & Kinross Council (2021) Flood Risk and Flood Risk Assessments, Adopted March 2021
 Angus Council (2016) Tay Estuary and Montrose Basin Local Flood Risk Management Plan
(2016 – 2022);
 Angus Council (2021) Tay Estuary and Montrose Basin Local Flood Risk Management Plan
(2022 – 2028);
 Scottish Environment Protection Agency (2024) Flood Risk and Land Use Vulnerability
Guidance, Version 5, July 2024;
 Scottish Environment Protection Agency (2018) SEPA Development Plan Guidance Note
2a: Development Management Guidance: Flood Risk (Reference: LUPS-DM-GU2a),
Version 2, July 2018;
 Scottish Environment Protection Agency (2023) Climate Change Allowances for Flood Risk
Assessment in Land Use Planning (Reference: LUPS-CC1), Version 5, July 2024;
 Scottish Environment Protection Agency (2024) Flood Risk Standing Advice for Planning
Authorities, July 2024.
 Scottish Environment Protection Agency Flood Risk Management Plan Tay Estuary and
Montrose Basin Local Plan District (LPD7) (2021); and
 Scottish Environment Protection Agency (2022) Technical Flood Risk Guidance for
Stakeholders (Reference: SS-NFR-P-002) June 2022.
It is noted that the recent release of NPF4 has resulted in potential incompatibility of some current
SEPA and other stakeholder technical and policy guidance documents with regards to flood risk
assessment in particular. SEPA have acknowledged that some of their current guidance documents
are currently being reviewed / updated to align with NPF4 and information contained within their
documents may no longer be valid. Therefore, it is unknown to what extent reliance can be placed
on existing flood risk guidance / policy which has not been updated to reflect the principles of NPF4
Policy 22. These are matters entirely outwith Gondolin’s control and professional judgement has been
applied accordingly.
2.2 National Planning Policy
This report has been prepared in accordance with NPF4 Policy 22 relating to Flood Risk and Water
Management, which states:
“Policy Intent: 
To strengthen resilience to flood risk by promoting avoidance as a first principle and reducing the
vulnerability of existing and future development to flooding.
Policy Outcomes:
 Places are resilient to current and future flood risk. 
 Water resources are used efficiently and sustainably. 
 Wider use of natural flood risk management benefits people and nature.”
Furthermore, NPF4 states that development proposals at risk of flooding or in a flood risk area will only
be supported if they are for:
 “Essential infrastructure where the location is required for operational reasons; 
 Water compatible uses; 
 Redevelopment of an existing building or site for an equal or less vulnerable use; or. 
 Redevelopment of previously used sites in built up areas where the LDP has identified a
need to bring these into positive use and where proposals demonstrate that long-term
safety and resilience can be secured in accordance with relevant SEPA advice”.
The definition of ‘flood risk area’ or ‘at risk of flooding’ in NPF4 is as follows:

Page 44

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – FRA| 30/03/2026
Registered Company No. SC706920
8
“For planning purposes, at risk of flooding or in a flood risk area means land or built form with an annual
probability of being flooded of greater than 0.5% which must include an appropriate allowance for
future climate change. This risk of flooding is indicated on SEPA’s future flood maps or may need to
be assessed in a flood risk assessment. An appropriate allowance for climate change should be taken
from the latest available guidance and evidence available for application in Scotland. The
calculated risk of flooding can take account of any existing, formal flood protection schemes in
determining the risk to the site. Where the risk of flooding is less than this threshold, areas will not be
considered ‘at risk of flooding’ for planning purposes, but this does not mean there is no risk at all, just
that the risk is sufficiently low to be acceptable for the purpose of planning. This includes areas where
the risk of flooding is reduced below this threshold due to a formal flood protection scheme.”
2.3 SEPA Flood Risk and Land Use Vulnerability Guidance 
This guidance outlines how SEPA assess the vulnerability to flooding of different land use with the
following categories:
 Most Vulnerable Uses;
 Highly Vulnerable Uses;
 Least Vulnerable Uses;
 Essential Infrastructure; and
 Water Compatible uses.
The following excerpt from the guidance is provided for context:
“This guidance supports Policy 22 of the National Planning Framework 4 (NPF4) by explaining
vulnerability in a flooding context, and the relative vulnerability of different land uses to flooding.
Policy 22 sets out exceptions where development can be permitted in a flood risk area. This guidance
aims to support application of the first three of those exceptions, specifically the emboldened terms: 
i. Essential infrastructure where the location is required for operational reasons. 
ii. Water compatible uses; and
iii. Redevelopment of an existing building or site for an equal or less vulnerable use.” 
2.4 SEPA Flood Risk Classifications
SEPAs online indicative Flood Map is used to categorise fluvial, surface water and coastal flood risk
and these are defined as follows:
 High Likelihood: A flood event is likely to occur in the defined area on average once in
every ten years (1:10) or a 10% AEP chance of happening in any one year;
 Medium Likelihood: A flood event is likely to occur in the defined area on average
once in every two hundred years (1:200) or a 0.5% AEP chance of happening in any
one year; and
 Low likelihood: A flood event is likely to occur in the defined area on average once in
every thousand years (1:1000) or a 0.1% AEP chance of happening in any one year.
2.5 Proposed Development Suitability 
With reference to SEPA Flood Risk and Land Use Vulnerability guidance the proposed development is
considered to be in the Highly Vulnerable Uses category (i.e. residential dwellings) and will be suitable
in flood risk planning terms if the site is not located within a ‘flood risk area’. It is not expected that any
of the exceptions outlined in Section 2.3 will apply to this site.

Page 45

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – FRA| 30/03/2026
Registered Company No. SC706920
9
3. Flood Risk Assessment
3.1 Screening Assessment of Potential Source of Flood Risk
3.1.1 Overview
There are a number of potential sources of flooding which should be evaluated in accordance with
best practice and NPF4 such as:
 Flooding from rivers or fluvial flooding;
 Flooding from the sea or tidal / coastal flooding;
 Flooding from land;
 Flooding from groundwater;
 Flooding from sewers; and
 Flooding from reservoirs, canals, and other artificial sources.
The flood risk from each of these potential sources is discussed in the following sections and a
‘screening assessment’ is presented in Section 3.1.9 which summarises the potential flood risk sources
and if applicable, those requiring a more detailed analysis and specification of bespoke mitigation
measures.
Flood ‘risk’ definitions within the screening exercise are based on a qualitative technical assessment
and professional judgement taking into account the information reviewed, risk to site users and the
proposed development itself. 
3.1.2 Flood History
Fingask, Craigburn and the surrounding area is not classed as a Potentially Vulnerable Area (PVA)
under the Tay Estuary and Montrose Basin Local Flood Risk Management Plan (LFRMP)5 and as such
there is limited information available in regards to the flood history. SEPA’s Flood Risk Management
Maps do not identify any people or properties at risk of flooding and no record of historical flooding
could be found elsewhere. 
3.1.3 Fluvial Flooding
Review of SEPA’s Fluvial Flood Map for the site indicates that a large area through the centre of the
site is at ‘Medium’ to ‘High’ risk of fluvial flooding from the Craig Burn. The Craig Burn runs
approximately 10 – 20m upgradient to the northeast in an artificially straightened channel. If the
channel has inadequate capacity to convey the design flood, then it would overtop in a southerly
direction towards the site as indicated on the maps. 
As such, there is sufficient evidence to consider a potential ‘High Risk’ of fluvial flooding at the site
and therefore a further technical flood risk assessment will be conducted in a subsequent section. 
3.1.4 Tidal/Coastal Flooding 
Review of SEPA’s Coastal Flooding Map for the site indicates that the site is located sufficiently inland
and upgradient from tidally influenced waters and the coast, thus is not subject to any tidal or coastal
flood risk.
As such there is ‘No Risk’ of Flooding from this source and it is therefore not considered further in this
assessment. 
5 Scottish Environment Protection Agency (2021) Flood Risk Management Plan: Tay Estuary and Montrose Basin Local Plan District
(LPD 7)

Page 46

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – FRA| 30/03/2026
Registered Company No. SC706920
10
3.1.5 Flooding from Land (Pluvial or Surface Water Flooding)
Review of SEPA’s Surface Water Flood Map shows no flood risk from this source at the development
site. The site has a natural slope to the south which would allow rainfall runoff generated to be readily
shed overland in the form of sheet flow. 
Taking the above into account it is considered that there is ‘Low Risk’ of surface water flooding to the
site and it is therefore not considered further. 
3.1.6 Groundwater Flooding
Review of SEPA’s Groundwater Flood Map indicates the site and the surrounding local area are not
located within a groundwater flooding area. Review of the site geology confirms the bedrock is a
Class 1B aquifer producing moderate amounts of groundwater through intergranular flow. 
Taking the above into account it is considered that there is a ‘Low Risk’ of groundwater flooding and
therefore flooding from this source is not considered further. 
3.1.7 Flooding from Sewers / Drainage Systems
Scottish Water Asset Plans have been sourced for the area of the development and are appended
to this document as Appendix C. These confirm there are no public sewers in the vicinity of the site.
The three existing properties at Craigburn operate on small private wastewater treatment systems
which do not present a material flood risk to the site. No other drainage features (road drainage, land
drainage etc.) were observed during the site visit. 
Taking this into account, it is considered that there is ‘No Risk’ of flooding to the site from sewers and
drainage systems and therefore this source is not considered further in the assessment. 
3.1.8 Flooding from Infrastructure Failure / Blockage
Review of SEPA’s Reservoir Flood Mapping indicates that there are no significant impoundments of
water immediately upgradient and in hydraulic continuity with the site which would pose a flood risk
to the site in the event of failure. 
However, further upstream the Craig Burn passes through Fingask Castle Gardens. This includes two
decorative ponds created with small dam structures, the largest of which is situated approximately
200m upstream of the site. These structures were inspected during the site visit and appeared in good
condition, with outflows controlled by weirs. The weir at the downstream pond may have limited
capacity due to the footbridge spanning it at a low level. However, should any backing-up occur,
the pond would overspill onto the road to the southwest before returning to the watercourse shortly
downstream. As exceedance flows from the pond would take this route, there is no erosional risk to
the structure during an overtopping scenario. 
A small historic reservoir known as the Mill Dam is also located approximately 1.1km upstream of the
site to serve the now defunct Fingask Sawmill. However, due the limited size, distance upstream and
number of structures impeding flow downstream, any failure at this point is not predicted to result in
a significant rapid release of water capable of affecting the proposed development site.
A small, covered (Scottish Water operated) reservoir dating from the 1950s is located upgradient at
approximate NGR: NO 22684 27818 in the catchment of the Craig Burn. Historically failure of such
structures has been an extreme low probability event and the water supply asset will be subject to
rigorous monitoring and maintenance regime by Scottish Water. Therefore, the risk of failure is
considered extremely low and the overall volume of water which could be released would be
sufficient attenuated / spread upstream of the site that it would not overwhelm channel / bridge
capacities downstream and thus impact the site.
The covered reservoir is fed by a pumping station approximately 120m the west of the site boundary,
to the north of the existing minor road. It the event of a failure or leak at this location, flows would
follow the natural topography to the south and away from the site. Two Scottish Water distribution
mains (200mm and 250mm Ductile Iron) run from the pumping station across the southern corner of
the site from west to east. In the extremely unlikely event of a leak / failure of the mains, flows will
follow the topography and rapidly shed offsite to the south.

Page 47

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – FRA| 30/03/2026
Registered Company No. SC706920
11
A curling pond is also marked on some maps; however, curling ponds are shallow temporary
structures and as such are immaterial from a flood risk perspective. 
In the event of failure of the aforementioned upstream culverts / structures on the Craigburn – due to
the channel geometry / local topography, upstream flows would readily re-join the downstream
channel and the effects would be very time limited before remedial actions are taken.
There are no other known water infrastructure features at / in proximity to the site which would pose
a material flood risk in the event of failure. 
Considering all the points above, the development site is at ‘Low Risk’ of flooding from this source and
therefore is not considered further in the assessment. 
3.1.9 Flood Risk Screening Assessment Review
A summary of the potential flood risk to the site from the sources reviewed is presented in Table 2 below. 
This ‘Screening Assessment’ is used to identify if any sources of flood risk are required to be investigated
in more detail i.e. a ‘Technical’ more detailed assessment which would include consideration /
specification of bespoke flood mitigation measures for the site development. 
Table 2 Flood Risk Screening Assessment
Potential Flood Source Screening Assessment of
Flood Risk at Site1
Requiring Further
Consideration i.e. Technical
Assessment?
Fluvial flooding High Risk Yes
Tidal flooding No Risk No
Flooding from land / surface water Low Risk No
Groundwater flooding Low Risk No
Flooding from sewers / drainage
systems No Risk No
Flooding due to infrastructure
failure / blockage Low Risk No
Notes: 1only Flood Risks designated as being ‘medium’ or ‘high’ warrant further investigation  
The Screening Assessment above indicates that Fluvial Flooding requires further consideration in the
context of the proposed development. This is discussed in detail in Section 4. All other sources of
flooding have been identified as low risk or lower and therefore will not be considered further. 
3.2 Climate Change 
3.2.1 Context
The most recent Climate Change (CC) projections published by The UK Climate Impacts Programme
are presented in report ‘UKCP18’. Central estimates published in UKCP18 indicate marked increases
in winter rainfall and decrease in summer rainfall but with more intense storms under all CO2 emissions
scenarios across the majority of the country.
SEPA’s most recent climate change allowances were published in April 20236 and are based on
UKCP18 findings in conjunction with The Centre for Ecology and Hydrology’s (CEH) 2020 study7.
A climate change allowance in drainage and flood risk assessment terms is a prediction of
anticipated change in peak river flow, peak rainfall intensity and sea level rise caused by future
climate change. 
6 Scottish Environment Protection Agency (2023) Climate change allowances for flood risk assessment in land use planning
7 Centre for Ecology & Hydrology (2021) Climate change impacts on peak river flows: Combining national-scale hydrological
modelling and probabilistic projections

Page 48

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – FRA| 30/03/2026
Registered Company No. SC706920
12
The allowances applied for sea level rise, peak river flow and peak rainfall intensity are determined
by river basin regions across Scotland. SEPA have developed a web map8 to allow any location in
Scotland to be identified for its applicable river basin region and respective climate change uplift
allowances.
3.2.2 Peak River flow 
With reference to SEPA’s online climate change map service, the site is located within the Tay River
Basin Region. The peak river flow allowance until 2100 for this region is a 53% uplift. 
The Technical Fluvial Flood Risk Assessment has been carried out using the Peak Rainfall Intensity
Allowance as SEPA guidance9 indicates this is more appropriate for small catchments. 
3.2.3 Peak rainfall intensity 
The peak rainfall intensity allowance until 2100 for the Tay River Basin Region is 39%. 
A Technical Fluvial Flood Risk Assessment has been carried out with the above climate change
allowance incorporated into the assessment. Therefore, the increase in peak river flow due to climate
change has been accounted for. Further detail is available in Section 4.2. 
3.2.4 Sea Level Rise
The cumulative sea level rise allowance until 2100 for the Tay River Basin Region is a 0.85m uplift. 
This increase in predicted Sea Level rise will not increase the coastal flood risk to the site due to the
distance from the site to the closest tidally influenced waters and elevation differential. 
4. Technical Fluvial Flood Risk Assessment
4.1 Context
The screening assessment outlined above considers a potential ‘High’ risk of flooding from fluvial
sources attributed to the Craig Burn. SEPA’s flood maps are not produced at a suitably accurate local
scale to be relied upon for site specific assessments (as caveated by SEPA themselves) and thus a
more detailed quantitative assessment has been undertaken to better understand the site-specific
risk. As such, a technical assessment of fluvial flooding at the site has been undertaken. 
The following sections provide an overview of the approach undertaken to more accurately
determine the potential flood risk at the site. The approach included the estimation of peak flow
within the Craig Burn using industry standard software and estimating the channel capacity at
specific cross-sections upstream and adjacent to the development site. 
4.2 Craig Burn Peak Flow Assessment
To inform the channel capacity assessment, an estimate of the peak flow has been undertaken using
catchment characteristics obtained from the FEH Web Service in combination with the industry
standard Revitalised Flood Hydrograph V.2 (ReFH2) software. Table 3 below presents the peak flow
estimates for a range of return periods. The full ReFH2 analysis is included as Appendix B. 
Table 3 Craig Burn Peak Flow Summary 
Return Period
(years) AEP (%) ReFH2 Peak Flow (m3/s)
2 50 1.54
10 10 2.49
30 3.3 3.23 
8 SEPA Climate Change Allowances for Flood Risk Assessment in Land Use Planning:
https://scottishepa.maps.arcgis.com/apps/webappviewer/index.html?id=2ddf84e295334f6b93bd0dbbb9ad7417 
9 Scottish Environment Protection Agency, Flood Modelling Guidance for Responsible Authorities, Version 1.1

Page 49

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – FRA| 30/03/2026
Registered Company No. SC706920
13
Return Period
(years) AEP (%) ReFH2 Peak Flow (m3/s)
100 1 4.28
200 0.5 5.03
200 +39% CC1 0.5 +39% CC 7.33
1,000 0.1 7.05
Notes: 1 Climate change uplift of 39% applied to peak river flow estimates
As per SEPA guidance the flood design criteria for the site will be taken as the 200yr plus climate
change uplift estimate of 7.33m3/s as this yields the highest peak flow estimate (when compared with
the 1,000yr estimate). 
It is noted that the flood hydrograph at the site is likely to be heavily attenuated due to the presence
of multiple bridges, culverts, ponds and weirs in the upstream catchment. The catchment descriptors
and ReFH2 modelling methodology are unlikely to have fully accounted for this and therefore it is
likely that above estimate of design flow is more conservative than that produced by other industry
standard flow methods. 
4.3 Bridge Capacity Assessment
4.3.1 Overview
Immediately upstream of the site, the Craig Burn passes beneath two arch bridges, which in the event
of surcharging or blockage may back up to inundate areas outwith the natural floodplain of the
watercourse. Therefore, a capacity assessment of the structures has been undertaken to determine
their capability to convey the peak flow in the river. 
4.3.2 Assessment
The capacity of the Bridge S-01 (upstream) has been assessed using the application of the Colebrook-
White equation for calculating flow within a pipe. A summary of the calculations conducted is
provided in Table 4 below.
Table 4 Bridge Capacity Assessment
Parameter Units Value Notes
Cross-sectional Area m2 2.014 Based on site specific measurements
Slope - 0.025 Measured from LiDAR data
Roughness Coefficient - 15 Conservative assumption for old brickwork
Estimated Capacity m3/s 9.25 Estimated from published hydraulic tables
Design Peak Flow m3/s 7.33 As per Section 4.2. 
The above assessment indicates the bridge has sufficient capacity to convey the design peak and
as such would not materially restrict the peak flow and create a material backing up effect and / or
overtopping of the structure. It is likely there would be some localised ‘afflux’ and throttling of flow
through the structure due to the geometry of the bridge and channel.
Bridge S-02 (downstream) has approximately double the cross-sectional area of Bridge S-01 and as
such will also have adequate capacity to accommodate the peak flow. 
4.3.3 Blockage Scenarios & Exceedance Routes
If a blockage / overtopping scenario were to occur upstream of the site, it would occur at Bridge S-
01 as this is upstream and has a significantly more limited cross section than Bridge S-02. Water would
back-up along the river channel to an elevation of approximately 22.0mAOD before overtopping the
road and immediately returning to channel on the downstream side. There are no walls or parapets
on the road to inhibit exceedance flows at this location.

Page 50

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – FRA| 30/03/2026
Registered Company No. SC706920
14
4.4 Channel Capacity Assessment
4.4.1 Overview
An assessment of channel capacity within the Craig Burn at the site location has been undertaken
downstream of the road bridge (S-02) to determine if the channel can convey the expected peak
flow as estimated above. 4no. cross-sections have been assessed at positions upstream and adjacent
to the site which were considered to have the highest risk of flooding out of bank (e.g. least capacity).
The channel capacity has been estimated using the open channel Manning’s Equation, information
obtained from site observations / measurements and LiDAR data sourced from the Scottish Remote
Sensing Portal. Table 5 below provides an overview of the measured parameters and estimated
capacity for the respective cross sections. The location of each cross section is provided on Drawing
FRA-002. 
Table 5 Manning’s Equation Channel Capacity Summary 
Parameter Units CS-01 CS-02 CS-03 CS-04 Notes 
Area (A) m2 6.42 6.94 9.13 7.63 Based on site specific measurements
Wetted
Perimeter (P) m 7.66 7.59 10.30 8.74 Based on site specific measurements
Hydraulic
Radius (R) m 0.838 0.914 0.886 0.873 𝑅 = 𝐴
𝑃
Slope (S) - 0.0182 0.0182 0.0182 0.0182
Measured using LiDAR data (slope estimation of
watercourse between cross-sections) and
adopting a conservative approach by using the
lowest slope value
Manning’s
Coefficient (n) - 0.045 0.045 0.045 0.045 Conservative published value for channel
roughness based on site observations
Velocity (V) m/s 2.665 2.823 2.766 2.739 𝑉 = 𝑅଴.଺଻𝑥 𝑆଴.ହ
𝑛
Channel
Capacity (Q) m3/s 17.12 19.57 25.27 20.91 𝑄 = 𝑉𝐴 
The assessment has provided channel capacities ranging from 17.12m3/s to 25.27m3/s upstream to
downstream. This will provide adequate capacity to contain the design peak estimate of 7.33m3/s. 
4.4.2 Outcomes
The channel capacity assessment shown above clearly indicates that during the design flood event
(200yr + 39%), flows would be retained within the channel of the Craig Burn. It is clear that SEPA’s
Fluvial Flood Maps do not accurately represent fluvial flood risk from the Craig Burn. It is highly likely
that the indicative modelling methodology adopted by the SEPA Flood Maps (which are not to be
relied upon for site specific assessments) use at best a 5m DTM at the site / surrounding area and this
resolution is not sufficient to capture the channel with sufficient detail. Site observations and more
detailed LiDAR data sourced from the Scottish Remote Sensing Portal clearly support this. 
4.5 Fluvial Flood Risk Summary
The Bridge Capacity Assessment has shown that both bridges have more than sufficient capacity for
the design peak flow on the Craig Burn (200 yr + 39%). In the case of an exceedance flood flow
considerably greater than this, or a major blockage scenario at the structure, flows would overtop
the bridge and return to channel immediately downstream. 
The Channel Capacity Assessment confirms that under the most conservative assumptions the
channel would contain the peak flow with ample freeboard. As such no fluvial flooding within the site
boundary is predicted.

Page 51

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – FRA| 30/03/2026
Registered Company No. SC706920
15
Taking into account the points above, it is considered that the residual flood risk from fluvial sources is
considered to be ‘Low’. Therefore, the development is not located in a ‘Flood Risk Area’ as defined
by NPF4 Policy 22 and the development proposals are compliant with current policy regarding flood
risk. 
4.6 Recommendations
Due to the Low Risk of flooding assessed, no formal flood risk mitigation measures are proposed for
the site based on the FRA undertaken. 
However, in accordance with current best practice and guidance provided by CIRIA, it is
recommended that a minimum freeboard of 600mm is provided between the finished ground floor
level of the development and existing surrounding ground levels.  
5. Closure
Gondolin Land and Water Ltd (Gondolin) has been appointed by Mr Stuart Heslop (the Client) to
prepare a Flood Risk Assessment (FRA) report in support of a planning application for the
development of a residential dwelling and associated works on land at Craigburn, Fingask, Rait, Perth
& Kinross, PH2 7RU. 
In accordance with national planning policy and guidance, all potential sources of flooding to the
site have been considered. The Flood Risk Screening Assessment confirms that the site is overall of
‘Low Risk’ or lower from flooding from all sources with the exception of fluvial flooding.
A further Technical Assessment for fluvial flood risk was conducted, incorporating a Bridge Capacity
Assessment and a Channel Capacity Assessment for the Craig Burn. The results confirmed the design
flood on the watercourse would be contained by the channel and therefore there is a ‘Low Risk’ of
fluvial flooding within the site boundary. 
As per NPF4 Policy 22, the proposed development is considered not to be located in a ‘Flood Risk
Area’ and therefore the proposals are compliant in flood risk planning policy terms.
Taking all of the above into account it is considered there is no impediment to the proposed
development being granted planning permission in principle on the grounds of flood risk.

Page 52

APPENDICES

Page 53

Appendix A
PKC Certification and SEPA Checklist

Page 54

45
Appendix B - Assessment Compliance Certification and
Insurance
Assessment	Compliance	Certification
I	certify	that	all	reasonable	skill,	care	and	attention	has	been	
exercised in undertaking the attached Flood Risk Assessment/
Drainage Impact Assessment/Surface Water Drainage Design*
(delete as appropriate).  The documentation has been prepared
for the below noted development in accordance with the PKC
Developers’ Guidance Note on Flooding and Drainage.
Planning Application Number
Name and Address of Organisation Preparing this Assessment
Signed
Name
Name of Development
Craigburn House - Proposed Residential Development
Address of Development
Craigburn
Fingask, Rait,
Perth & Kinross, PH2 7RU
N/A
Edinburgh, EH6 5AA
26 Leith Walk
Gondolin Land & Water Ltd
Zak Ritchie
Stuart HeslopStuart Heslop
Name of Developer
Managing Director
Position Held

Page 55

46
Engineering	Qualification(1)
(1) Chartered Engineer or equivalent from an appropriate Engineering Institution.
Insurance
Please attach a copy of your professional indemnity
insurance policy to this document.
C.Eng, C.WEM, MCIWEM
Date
30/03/2026

Page 56

Flood Risk Assessment (FRA) Checklist (SS-NFR-F-001 - Version 16 - Last updated 27/08/2019
Development Proposal Summary
Site Name:
Grid Reference: Easting: 323333 Northing: 727179
Local Authority:
Planning Reference number (if known):
Nature of the development: Residential If residential, state type:
Size of the development site: 0.97 Ha
Identified Flood Risk: Source: Fluvial Source name:
Land Use Planning
Is any of the site within the functional floodplain? (refer to
SPP para 255) No If yes, what is the net loss of storage? m3
Local Development Plan Name:
Allocation Number / Reference:
If yes, what is the proposed use for the site as identified in
the local plan? Select from List If Other please specify:
Does the local development plan and/or any pre-application
advice, identify any flood risk issues with or requirements for
the site.
Select from List
If so, please specify:
What is the proposed land use vulnerability? Highly Vulnerable
Supporting Information
Have clear maps / plans been provided within the FRA 
(including topographic and flood inundation plans)? Yes
Has sufficient supporting information, in line with our
Technical Guidance, been provided? For example: site
plans, photos, topographic information, structure
information and other site specific information.
Yes
Has a historic flood search been undertaken? Yes
Is a formal flood prevention scheme present? No
Current / historical site use:
Is the site considered vacant or derelict? No
Development Requirements
Freeboard on design water level: m
Is safe / dry access and egress available? Vehicular and Pedestrian Min access/egress level: m AOD
Design levels: Ground level: m AOD Min FFL: mAOD
Mitigation
Can development be designed to avoid all areas at risk of
flooding? Yes
Is mitigation proposed? No
If yes, is compenstory storage necessary? Select from List
Demonstration of compensatory storage on a "like for like"
basis? Select from List
Should water resistant materials and forms of construction
be used? Select from List
This document must be attached within the front cover of any Flood Risk Assessments issued to Local Planning Authorities (LPA) in support of a development proposal which may be at risk of flooding. The document
will take only a few minutes to complete and will assist SEPA in reviewing FRAs, when consulted by LPAs.  This document should not be a substitute for a FRA.
Craig Burn
Craigburn House
Perth and Kinross Council
N/A
2no. Residential Properties
If flood records in vicinity of the site please provide details:
Do the proposals represent an increase in land use vulnerability? Yes
If known, state the standard of protection offered:
Agricultural
Year of Publication:Is the site identified within the local development plan? No

Page 57

Flood Risk Assessment (FRA) Checklist (SS-NFR-F-001 - Version 16 - Last updated 27/08/2019
Hydrology
Is there a requirement to consider fluvial flooding? Yes
Area of catchment: 5.61 km2
Is a map of catchment area included in FRA?
Estimation method(s) used (please select all that apply): Pooled Analysis If Pooled analysis have group details been included?
Single Site Analysis
Enhanced Single Site
ReFH2
FEH RRM
Other If other (please specify methodology used):
Estimate of 200 year design flood flow: 5.03 m3/s
Qmed estimate: m3/s Method: 
Statistical Distribution Selected: Select from List Reasons for selection:
Hydraulics
Software used:          
If other please specify:
Number of cross sections: 4
Source of data (i.e. topographic survey, LiDAR etc): Site measurements Date obtained / surveyed: 07/02/2025
Modelled reach length: m
Any changes to default simulation parameters? If yes please provide details:
Model timestep:
Model grid size:
Any structures within the modelled length? Select from List Specify, if combination:
Maximum observed velocity: m/s
Brief summary of sensitivity tests, and range:           
variation on flow (%) % Please specify climate change scenario considered:           
variation on channel roughness (%) %          
blockage of structure (range of % blocked) %          
boundary conditions: Upstream Downstream
(1)  type Flow Select from List
Specify if other Specify if other:
(2)  does it influence water levels at the site? Select from List Select from List
Has model been calibrated (gauge data / flood records)? Select from List
Is the hydraulic model available to SEPA? Select from List
Design flood levels: 200 year N/A m AOD N/A m AOD
Cross section results provided? Select from List
Long section results provided? Select from List
Cross section ratings provided? Select from List
Tabular output provided (i.e. levels, velocities)?
Mass balance error: %
Coastal
Is there a requirement to consider coastal / tidal flooding? Select from List
Estimate of 200 year design flood level: m AOD
Estimation method(s) used: Select from List If other please specify methodology used:
Allowance for climate change (m): m
Allowance for wave action etc (m): m
Overall design flood level: m AOD
Approved by:
Organisation:
Date:
CLICK HERE
Zak Ritchie
Gondolin Land & Water
30/03/2026
Note: Further details and guidance is provided in 'Technical Flood Risk Guidance for Stakeholders' which can be accesssed here:-
200 year plus climate change
Catchment Descriptors
Select from List
39% Uplift
Manning
No
Select from ListHydraulic modelling method:

Page 58

Appendix B
Peak Flow Estimation

Page 59

Summary of estimate using the Flood Estimation Handbook revitalised flood
hydrograph method (ReFH2)
Site details
Site description:
Catchment Area (km²): 5.61
None
Site name: Craig Burn
Easting: 323400
Northing: 727200
Model run: 200 year 1.39 CC
Summary of results
Rainfall - FEH22 (mm): 84.76
Total Rainfall (mm): 55.25
Peak Rainfall (mm): 9.43 7.33
295.06
91.81Total runoff (ML):
Total flow (ML):
Peak flow (m³/s):
Loss model parameters
Name Value User-defined?
Cini (mm) 100.55 No
Cmax (mm) 434.46 No
Use alpha correction factor No No
Alpha correction factor n/a No
Rainfall parameters (Rainfall - FEH22)
Name Value User-defined?
Duration (hh:mm:ss) 03:45:00 No
Timestep (hh:mm:ss) 00:15:00 No
SCF (Seasonal correction factor) 0.68 No
ARF (Areal reduction factor) 0.96 No
Seasonality Winter No
Routing model parameters
Parameters
Where the user has overriden a system-generated value, this original value is shown in square brackets after
the value used.
* Indicates that the user locked the duration/timestep
Climate change factor 1.39 Yes
UK Design Flood Estimation
Generated on 21 February 2025 09:22:32 by DuncanBowie
Printed from the ReFH2 Flood Modelling software package, version 4.1.8879.22466
Checksum: D4EF-CBD6
Country: Scotland
Using plot scale calculations: No
Model: 2.3
Printed from the ReFH2 Flood Modelling software package, version 4.1.8879.22466
Page 1 of 14

Page 60

Name Value User-defined?
Tp (hr) 2 No
Up 0.65 No
Uk 0.8 No
Name Value User-defined?
BF0 (m³/s) 0.11 No
BL (hr) 31.61 No
BR 2.23 No
Baseflow model parameters
Name Value User-defined?
Sewer capacity (m³/s) 0 No
Exporting drained area (km²) 0 No
Urban area (km²) 0.03 No
Effective URBEXT2000 0 n/a
Impervious runoff factor 0.7 No
Imperviousness factor 0.4 No
Tp scaling factor 0.75 No
Depression storage depth (mm) 0.5 No
Urbanisation parameters
Printed from the ReFH2 Flood Modelling software package, version 4.1.8879.22466
Page 2 of 14

Page 61

Time
(hh:mm:ss)
Rain
(mm)
Sewer Loss
(m³/s)
Net Rain
(mm)
Runoff
(m³/s)
Baseflow
(m³/s)
Total Flow
(m³/s)
00:00:00 0.826 0.000 0.193 0.000 0.114 0.114
00:15:00 1.207 0.000 0.285 0.006 0.113 0.119
00:30:00 1.759 0.000 0.421 0.028 0.112 0.140
00:45:00 2.557 0.000 0.625 0.072 0.112 0.184
01:00:00 3.700 0.000 0.931 0.149 0.113 0.263
01:15:00 5.319 0.000 1.393 0.277 0.116 0.393
01:30:00 7.542 0.000 2.087 0.479 0.122 0.600
01:45:00 9.427 0.000 2.792 0.792 0.132 0.923
02:00:00 7.542 0.000 2.381 1.260 0.149 1.409
02:15:00 5.319 0.000 1.758 1.884 0.175 2.058
02:30:00 3.700 0.000 1.261 2.615 0.212 2.827
02:45:00 2.557 0.000 0.890 3.406 0.263 3.668
03:00:00 1.759 0.000 0.621 4.211 0.327 4.537
03:15:00 1.207 0.000 0.430 4.983 0.404 5.387
03:30:00 0.826 0.000 0.296 5.668 0.493 6.161
03:45:00 0.000 0.000 0.000 6.198 0.592 6.791
04:00:00 0.000 0.000 0.000 6.491 0.698 7.189
04:15:00 0.000 0.000 0.000 6.526 0.806 7.331
04:30:00 0.000 0.000 0.000 6.358 0.912 7.270
04:45:00 0.000 0.000 0.000 6.048 1.013 7.061
05:00:00 0.000 0.000 0.000 5.642 1.107 6.749
05:15:00 0.000 0.000 0.000 5.177 1.193 6.369
05:30:00 0.000 0.000 0.000 4.684 1.270 5.953
05:45:00 0.000 0.000 0.000 4.192 1.337 5.529
06:00:00 0.000 0.000 0.000 3.736 1.396 5.131
06:15:00 0.000 0.000 0.000 3.333 1.447 4.779
06:30:00 0.000 0.000 0.000 2.972 1.491 4.463
06:45:00 0.000 0.000 0.000 2.643 1.528 4.171
07:00:00 0.000 0.000 0.000 2.335 1.560 3.895
07:15:00 0.000 0.000 0.000 2.044 1.586 3.630
07:30:00 0.000 0.000 0.000 1.767 1.607 3.374
07:45:00 0.000 0.000 0.000 1.502 1.623 3.125
08:00:00 0.000 0.000 0.000 1.247 1.634 2.881
08:15:00 0.000 0.000 0.000 1.002 1.641 2.643
Time series data
Printed from the ReFH2 Flood Modelling software package, version 4.1.8879.22466
Page 3 of 14

Page 62

Time
(hh:mm:ss)
Rain
(mm)
Sewer Loss
(m³/s)
Net Rain
(mm)
Runoff
(m³/s)
Baseflow
(m³/s)
Total Flow
(m³/s)
08:30:00 0.000 0.000 0.000 0.771 1.644 2.415
08:45:00 0.000 0.000 0.000 0.561 1.643 2.204
09:00:00 0.000 0.000 0.000 0.384 1.638 2.022
09:15:00 0.000 0.000 0.000 0.248 1.631 1.879
09:30:00 0.000 0.000 0.000 0.153 1.621 1.774
09:45:00 0.000 0.000 0.000 0.089 1.611 1.700
10:00:00 0.000 0.000 0.000 0.048 1.599 1.647
10:15:00 0.000 0.000 0.000 0.022 1.587 1.609
10:30:00 0.000 0.000 0.000 0.008 1.575 1.583
10:45:00 0.000 0.000 0.000 0.001 1.563 1.564
11:00:00 0.000 0.000 0.000 0.000 1.550 1.550
11:15:00 0.000 0.000 0.000 0.000 1.538 1.538
11:30:00 0.000 0.000 0.000 0.000 1.526 1.526
11:45:00 0.000 0.000 0.000 0.000 1.514 1.514
12:00:00 0.000 0.000 0.000 0.000 1.502 1.502
12:15:00 0.000 0.000 0.000 0.000 1.490 1.490
12:30:00 0.000 0.000 0.000 0.000 1.479 1.479
12:45:00 0.000 0.000 0.000 0.000 1.467 1.467
13:00:00 0.000 0.000 0.000 0.000 1.455 1.455
13:15:00 0.000 0.000 0.000 0.000 1.444 1.444
13:30:00 0.000 0.000 0.000 0.000 1.432 1.432
13:45:00 0.000 0.000 0.000 0.000 1.421 1.421
14:00:00 0.000 0.000 0.000 0.000 1.410 1.410
14:15:00 0.000 0.000 0.000 0.000 1.399 1.399
14:30:00 0.000 0.000 0.000 0.000 1.388 1.388
14:45:00 0.000 0.000 0.000 0.000 1.377 1.377
15:00:00 0.000 0.000 0.000 0.000 1.366 1.366
15:15:00 0.000 0.000 0.000 0.000 1.355 1.355
15:30:00 0.000 0.000 0.000 0.000 1.345 1.345
15:45:00 0.000 0.000 0.000 0.000 1.334 1.334
16:00:00 0.000 0.000 0.000 0.000 1.324 1.324
16:15:00 0.000 0.000 0.000 0.000 1.313 1.313
16:30:00 0.000 0.000 0.000 0.000 1.303 1.303
16:45:00 0.000 0.000 0.000 0.000 1.293 1.293
17:00:00 0.000 0.000 0.000 0.000 1.282 1.282
Printed from the ReFH2 Flood Modelling software package, version 4.1.8879.22466
Page 4 of 14

Page 63

Time
(hh:mm:ss)
Rain
(mm)
Sewer Loss
(m³/s)
Net Rain
(mm)
Runoff
(m³/s)
Baseflow
(m³/s)
Total Flow
(m³/s)
17:15:00 0.000 0.000 0.000 0.000 1.272 1.272
17:30:00 0.000 0.000 0.000 0.000 1.262 1.262
17:45:00 0.000 0.000 0.000 0.000 1.252 1.252
18:00:00 0.000 0.000 0.000 0.000 1.242 1.242
18:15:00 0.000 0.000 0.000 0.000 1.233 1.233
18:30:00 0.000 0.000 0.000 0.000 1.223 1.223
18:45:00 0.000 0.000 0.000 0.000 1.213 1.213
19:00:00 0.000 0.000 0.000 0.000 1.204 1.204
19:15:00 0.000 0.000 0.000 0.000 1.194 1.194
19:30:00 0.000 0.000 0.000 0.000 1.185 1.185
19:45:00 0.000 0.000 0.000 0.000 1.175 1.175
20:00:00 0.000 0.000 0.000 0.000 1.166 1.166
20:15:00 0.000 0.000 0.000 0.000 1.157 1.157
20:30:00 0.000 0.000 0.000 0.000 1.148 1.148
20:45:00 0.000 0.000 0.000 0.000 1.139 1.139
21:00:00 0.000 0.000 0.000 0.000 1.130 1.130
21:15:00 0.000 0.000 0.000 0.000 1.121 1.121
21:30:00 0.000 0.000 0.000 0.000 1.112 1.112
21:45:00 0.000 0.000 0.000 0.000 1.103 1.103
22:00:00 0.000 0.000 0.000 0.000 1.095 1.095
22:15:00 0.000 0.000 0.000 0.000 1.086 1.086
22:30:00 0.000 0.000 0.000 0.000 1.078 1.078
22:45:00 0.000 0.000 0.000 0.000 1.069 1.069
23:00:00 0.000 0.000 0.000 0.000 1.061 1.061
23:15:00 0.000 0.000 0.000 0.000 1.052 1.052
23:30:00 0.000 0.000 0.000 0.000 1.044 1.044
23:45:00 0.000 0.000 0.000 0.000 1.036 1.036
24:00:00 0.000 0.000 0.000 0.000 1.028 1.028
24:15:00 0.000 0.000 0.000 0.000 1.020 1.020
24:30:00 0.000 0.000 0.000 0.000 1.011 1.011
24:45:00 0.000 0.000 0.000 0.000 1.004 1.004
25:00:00 0.000 0.000 0.000 0.000 0.996 0.996
25:15:00 0.000 0.000 0.000 0.000 0.988 0.988
25:30:00 0.000 0.000 0.000 0.000 0.980 0.980
25:45:00 0.000 0.000 0.000 0.000 0.972 0.972
Printed from the ReFH2 Flood Modelling software package, version 4.1.8879.22466
Page 5 of 14

Page 64

Time
(hh:mm:ss)
Rain
(mm)
Sewer Loss
(m³/s)
Net Rain
(mm)
Runoff
(m³/s)
Baseflow
(m³/s)
Total Flow
(m³/s)
26:00:00 0.000 0.000 0.000 0.000 0.965 0.965
26:15:00 0.000 0.000 0.000 0.000 0.957 0.957
26:30:00 0.000 0.000 0.000 0.000 0.949 0.949
26:45:00 0.000 0.000 0.000 0.000 0.942 0.942
27:00:00 0.000 0.000 0.000 0.000 0.935 0.935
27:15:00 0.000 0.000 0.000 0.000 0.927 0.927
27:30:00 0.000 0.000 0.000 0.000 0.920 0.920
27:45:00 0.000 0.000 0.000 0.000 0.913 0.913
28:00:00 0.000 0.000 0.000 0.000 0.905 0.905
28:15:00 0.000 0.000 0.000 0.000 0.898 0.898
28:30:00 0.000 0.000 0.000 0.000 0.891 0.891
28:45:00 0.000 0.000 0.000 0.000 0.884 0.884
29:00:00 0.000 0.000 0.000 0.000 0.877 0.877
29:15:00 0.000 0.000 0.000 0.000 0.870 0.870
29:30:00 0.000 0.000 0.000 0.000 0.863 0.863
29:45:00 0.000 0.000 0.000 0.000 0.857 0.857
30:00:00 0.000 0.000 0.000 0.000 0.850 0.850
30:15:00 0.000 0.000 0.000 0.000 0.843 0.843
30:30:00 0.000 0.000 0.000 0.000 0.837 0.837
30:45:00 0.000 0.000 0.000 0.000 0.830 0.830
31:00:00 0.000 0.000 0.000 0.000 0.823 0.823
31:15:00 0.000 0.000 0.000 0.000 0.817 0.817
31:30:00 0.000 0.000 0.000 0.000 0.811 0.811
31:45:00 0.000 0.000 0.000 0.000 0.804 0.804
32:00:00 0.000 0.000 0.000 0.000 0.798 0.798
32:15:00 0.000 0.000 0.000 0.000 0.792 0.792
32:30:00 0.000 0.000 0.000 0.000 0.785 0.785
32:45:00 0.000 0.000 0.000 0.000 0.779 0.779
33:00:00 0.000 0.000 0.000 0.000 0.773 0.773
33:15:00 0.000 0.000 0.000 0.000 0.767 0.767
33:30:00 0.000 0.000 0.000 0.000 0.761 0.761
33:45:00 0.000 0.000 0.000 0.000 0.755 0.755
34:00:00 0.000 0.000 0.000 0.000 0.749 0.749
34:15:00 0.000 0.000 0.000 0.000 0.743 0.743
34:30:00 0.000 0.000 0.000 0.000 0.737 0.737
Printed from the ReFH2 Flood Modelling software package, version 4.1.8879.22466
Page 6 of 14

Page 65

Time
(hh:mm:ss)
Rain
(mm)
Sewer Loss
(m³/s)
Net Rain
(mm)
Runoff
(m³/s)
Baseflow
(m³/s)
Total Flow
(m³/s)
34:45:00 0.000 0.000 0.000 0.000 0.731 0.731
35:00:00 0.000 0.000 0.000 0.000 0.726 0.726
35:15:00 0.000 0.000 0.000 0.000 0.720 0.720
35:30:00 0.000 0.000 0.000 0.000 0.714 0.714
35:45:00 0.000 0.000 0.000 0.000 0.709 0.709
36:00:00 0.000 0.000 0.000 0.000 0.703 0.703
36:15:00 0.000 0.000 0.000 0.000 0.697 0.697
36:30:00 0.000 0.000 0.000 0.000 0.692 0.692
36:45:00 0.000 0.000 0.000 0.000 0.687 0.687
37:00:00 0.000 0.000 0.000 0.000 0.681 0.681
37:15:00 0.000 0.000 0.000 0.000 0.676 0.676
37:30:00 0.000 0.000 0.000 0.000 0.670 0.670
37:45:00 0.000 0.000 0.000 0.000 0.665 0.665
38:00:00 0.000 0.000 0.000 0.000 0.660 0.660
38:15:00 0.000 0.000 0.000 0.000 0.655 0.655
38:30:00 0.000 0.000 0.000 0.000 0.650 0.650
38:45:00 0.000 0.000 0.000 0.000 0.644 0.644
39:00:00 0.000 0.000 0.000 0.000 0.639 0.639
39:15:00 0.000 0.000 0.000 0.000 0.634 0.634
39:30:00 0.000 0.000 0.000 0.000 0.629 0.629
39:45:00 0.000 0.000 0.000 0.000 0.624 0.624
40:00:00 0.000 0.000 0.000 0.000 0.619 0.619
40:15:00 0.000 0.000 0.000 0.000 0.615 0.615
40:30:00 0.000 0.000 0.000 0.000 0.610 0.610
40:45:00 0.000 0.000 0.000 0.000 0.605 0.605
41:00:00 0.000 0.000 0.000 0.000 0.600 0.600
41:15:00 0.000 0.000 0.000 0.000 0.595 0.595
41:30:00 0.000 0.000 0.000 0.000 0.591 0.591
41:45:00 0.000 0.000 0.000 0.000 0.586 0.586
42:00:00 0.000 0.000 0.000 0.000 0.581 0.581
42:15:00 0.000 0.000 0.000 0.000 0.577 0.577
42:30:00 0.000 0.000 0.000 0.000 0.572 0.572
42:45:00 0.000 0.000 0.000 0.000 0.568 0.568
43:00:00 0.000 0.000 0.000 0.000 0.563 0.563
43:15:00 0.000 0.000 0.000 0.000 0.559 0.559
Printed from the ReFH2 Flood Modelling software package, version 4.1.8879.22466
Page 7 of 14

Page 66

Time
(hh:mm:ss)
Rain
(mm)
Sewer Loss
(m³/s)
Net Rain
(mm)
Runoff
(m³/s)
Baseflow
(m³/s)
Total Flow
(m³/s)
43:30:00 0.000 0.000 0.000 0.000 0.555 0.555
43:45:00 0.000 0.000 0.000 0.000 0.550 0.550
44:00:00 0.000 0.000 0.000 0.000 0.546 0.546
44:15:00 0.000 0.000 0.000 0.000 0.542 0.542
44:30:00 0.000 0.000 0.000 0.000 0.537 0.537
44:45:00 0.000 0.000 0.000 0.000 0.533 0.533
45:00:00 0.000 0.000 0.000 0.000 0.529 0.529
45:15:00 0.000 0.000 0.000 0.000 0.525 0.525
45:30:00 0.000 0.000 0.000 0.000 0.521 0.521
45:45:00 0.000 0.000 0.000 0.000 0.516 0.516
46:00:00 0.000 0.000 0.000 0.000 0.512 0.512
46:15:00 0.000 0.000 0.000 0.000 0.508 0.508
46:30:00 0.000 0.000 0.000 0.000 0.504 0.504
46:45:00 0.000 0.000 0.000 0.000 0.500 0.500
47:00:00 0.000 0.000 0.000 0.000 0.496 0.496
47:15:00 0.000 0.000 0.000 0.000 0.492 0.492
47:30:00 0.000 0.000 0.000 0.000 0.489 0.489
47:45:00 0.000 0.000 0.000 0.000 0.485 0.485
48:00:00 0.000 0.000 0.000 0.000 0.481 0.481
48:15:00 0.000 0.000 0.000 0.000 0.477 0.477
48:30:00 0.000 0.000 0.000 0.000 0.473 0.473
48:45:00 0.000 0.000 0.000 0.000 0.470 0.470
49:00:00 0.000 0.000 0.000 0.000 0.466 0.466
49:15:00 0.000 0.000 0.000 0.000 0.462 0.462
49:30:00 0.000 0.000 0.000 0.000 0.459 0.459
49:45:00 0.000 0.000 0.000 0.000 0.455 0.455
50:00:00 0.000 0.000 0.000 0.000 0.451 0.451
50:15:00 0.000 0.000 0.000 0.000 0.448 0.448
50:30:00 0.000 0.000 0.000 0.000 0.444 0.444
50:45:00 0.000 0.000 0.000 0.000 0.441 0.441
51:00:00 0.000 0.000 0.000 0.000 0.437 0.437
51:15:00 0.000 0.000 0.000 0.000 0.434 0.434
51:30:00 0.000 0.000 0.000 0.000 0.431 0.431
51:45:00 0.000 0.000 0.000 0.000 0.427 0.427
52:00:00 0.000 0.000 0.000 0.000 0.424 0.424
Printed from the ReFH2 Flood Modelling software package, version 4.1.8879.22466
Page 8 of 14

Page 67

Time
(hh:mm:ss)
Rain
(mm)
Sewer Loss
(m³/s)
Net Rain
(mm)
Runoff
(m³/s)
Baseflow
(m³/s)
Total Flow
(m³/s)
52:15:00 0.000 0.000 0.000 0.000 0.420 0.420
52:30:00 0.000 0.000 0.000 0.000 0.417 0.417
52:45:00 0.000 0.000 0.000 0.000 0.414 0.414
53:00:00 0.000 0.000 0.000 0.000 0.411 0.411
53:15:00 0.000 0.000 0.000 0.000 0.407 0.407
53:30:00 0.000 0.000 0.000 0.000 0.404 0.404
53:45:00 0.000 0.000 0.000 0.000 0.401 0.401
54:00:00 0.000 0.000 0.000 0.000 0.398 0.398
54:15:00 0.000 0.000 0.000 0.000 0.395 0.395
54:30:00 0.000 0.000 0.000 0.000 0.392 0.392
54:45:00 0.000 0.000 0.000 0.000 0.388 0.388
55:00:00 0.000 0.000 0.000 0.000 0.385 0.385
55:15:00 0.000 0.000 0.000 0.000 0.382 0.382
55:30:00 0.000 0.000 0.000 0.000 0.379 0.379
55:45:00 0.000 0.000 0.000 0.000 0.376 0.376
56:00:00 0.000 0.000 0.000 0.000 0.373 0.373
56:15:00 0.000 0.000 0.000 0.000 0.370 0.370
56:30:00 0.000 0.000 0.000 0.000 0.368 0.368
56:45:00 0.000 0.000 0.000 0.000 0.365 0.365
57:00:00 0.000 0.000 0.000 0.000 0.362 0.362
57:15:00 0.000 0.000 0.000 0.000 0.359 0.359
57:30:00 0.000 0.000 0.000 0.000 0.356 0.356
57:45:00 0.000 0.000 0.000 0.000 0.353 0.353
58:00:00 0.000 0.000 0.000 0.000 0.350 0.350
58:15:00 0.000 0.000 0.000 0.000 0.348 0.348
58:30:00 0.000 0.000 0.000 0.000 0.345 0.345
58:45:00 0.000 0.000 0.000 0.000 0.342 0.342
59:00:00 0.000 0.000 0.000 0.000 0.340 0.340
59:15:00 0.000 0.000 0.000 0.000 0.337 0.337
59:30:00 0.000 0.000 0.000 0.000 0.334 0.334
59:45:00 0.000 0.000 0.000 0.000 0.332 0.332
60:00:00 0.000 0.000 0.000 0.000 0.329 0.329
60:15:00 0.000 0.000 0.000 0.000 0.326 0.326
60:30:00 0.000 0.000 0.000 0.000 0.324 0.324
60:45:00 0.000 0.000 0.000 0.000 0.321 0.321
Printed from the ReFH2 Flood Modelling software package, version 4.1.8879.22466
Page 9 of 14

Page 68

Time
(hh:mm:ss)
Rain
(mm)
Sewer Loss
(m³/s)
Net Rain
(mm)
Runoff
(m³/s)
Baseflow
(m³/s)
Total Flow
(m³/s)
61:00:00 0.000 0.000 0.000 0.000 0.319 0.319
61:15:00 0.000 0.000 0.000 0.000 0.316 0.316
61:30:00 0.000 0.000 0.000 0.000 0.314 0.314
61:45:00 0.000 0.000 0.000 0.000 0.311 0.311
62:00:00 0.000 0.000 0.000 0.000 0.309 0.309
62:15:00 0.000 0.000 0.000 0.000 0.306 0.306
62:30:00 0.000 0.000 0.000 0.000 0.304 0.304
62:45:00 0.000 0.000 0.000 0.000 0.302 0.302
63:00:00 0.000 0.000 0.000 0.000 0.299 0.299
63:15:00 0.000 0.000 0.000 0.000 0.297 0.297
63:30:00 0.000 0.000 0.000 0.000 0.295 0.295
63:45:00 0.000 0.000 0.000 0.000 0.292 0.292
64:00:00 0.000 0.000 0.000 0.000 0.290 0.290
64:15:00 0.000 0.000 0.000 0.000 0.288 0.288
64:30:00 0.000 0.000 0.000 0.000 0.285 0.285
64:45:00 0.000 0.000 0.000 0.000 0.283 0.283
65:00:00 0.000 0.000 0.000 0.000 0.281 0.281
65:15:00 0.000 0.000 0.000 0.000 0.279 0.279
65:30:00 0.000 0.000 0.000 0.000 0.276 0.276
65:45:00 0.000 0.000 0.000 0.000 0.274 0.274
66:00:00 0.000 0.000 0.000 0.000 0.272 0.272
66:15:00 0.000 0.000 0.000 0.000 0.270 0.270
66:30:00 0.000 0.000 0.000 0.000 0.268 0.268
66:45:00 0.000 0.000 0.000 0.000 0.266 0.266
67:00:00 0.000 0.000 0.000 0.000 0.264 0.264
67:15:00 0.000 0.000 0.000 0.000 0.262 0.262
67:30:00 0.000 0.000 0.000 0.000 0.260 0.260
67:45:00 0.000 0.000 0.000 0.000 0.257 0.257
68:00:00 0.000 0.000 0.000 0.000 0.255 0.255
68:15:00 0.000 0.000 0.000 0.000 0.253 0.253
68:30:00 0.000 0.000 0.000 0.000 0.251 0.251
68:45:00 0.000 0.000 0.000 0.000 0.249 0.249
69:00:00 0.000 0.000 0.000 0.000 0.247 0.247
69:15:00 0.000 0.000 0.000 0.000 0.246 0.246
69:30:00 0.000 0.000 0.000 0.000 0.244 0.244
Printed from the ReFH2 Flood Modelling software package, version 4.1.8879.22466
Page 10 of 14

Page 69

Time
(hh:mm:ss)
Rain
(mm)
Sewer Loss
(m³/s)
Net Rain
(mm)
Runoff
(m³/s)
Baseflow
(m³/s)
Total Flow
(m³/s)
69:45:00 0.000 0.000 0.000 0.000 0.242 0.242
70:00:00 0.000 0.000 0.000 0.000 0.240 0.240
70:15:00 0.000 0.000 0.000 0.000 0.238 0.238
70:30:00 0.000 0.000 0.000 0.000 0.236 0.236
70:45:00 0.000 0.000 0.000 0.000 0.234 0.234
71:00:00 0.000 0.000 0.000 0.000 0.232 0.232
71:15:00 0.000 0.000 0.000 0.000 0.230 0.230
71:30:00 0.000 0.000 0.000 0.000 0.229 0.229
71:45:00 0.000 0.000 0.000 0.000 0.227 0.227
72:00:00 0.000 0.000 0.000 0.000 0.225 0.225
72:15:00 0.000 0.000 0.000 0.000 0.223 0.223
72:30:00 0.000 0.000 0.000 0.000 0.222 0.222
72:45:00 0.000 0.000 0.000 0.000 0.220 0.220
73:00:00 0.000 0.000 0.000 0.000 0.218 0.218
73:15:00 0.000 0.000 0.000 0.000 0.216 0.216
73:30:00 0.000 0.000 0.000 0.000 0.215 0.215
73:45:00 0.000 0.000 0.000 0.000 0.213 0.213
74:00:00 0.000 0.000 0.000 0.000 0.211 0.211
74:15:00 0.000 0.000 0.000 0.000 0.210 0.210
74:30:00 0.000 0.000 0.000 0.000 0.208 0.208
74:45:00 0.000 0.000 0.000 0.000 0.206 0.206
75:00:00 0.000 0.000 0.000 0.000 0.205 0.205
75:15:00 0.000 0.000 0.000 0.000 0.203 0.203
75:30:00 0.000 0.000 0.000 0.000 0.201 0.201
75:45:00 0.000 0.000 0.000 0.000 0.200 0.200
76:00:00 0.000 0.000 0.000 0.000 0.198 0.198
76:15:00 0.000 0.000 0.000 0.000 0.197 0.197
76:30:00 0.000 0.000 0.000 0.000 0.195 0.195
76:45:00 0.000 0.000 0.000 0.000 0.194 0.194
77:00:00 0.000 0.000 0.000 0.000 0.192 0.192
77:15:00 0.000 0.000 0.000 0.000 0.191 0.191
77:30:00 0.000 0.000 0.000 0.000 0.189 0.189
77:45:00 0.000 0.000 0.000 0.000 0.188 0.188
78:00:00 0.000 0.000 0.000 0.000 0.186 0.186
78:15:00 0.000 0.000 0.000 0.000 0.185 0.185
Printed from the ReFH2 Flood Modelling software package, version 4.1.8879.22466
Page 11 of 14

Page 70

Time
(hh:mm:ss)
Rain
(mm)
Sewer Loss
(m³/s)
Net Rain
(mm)
Runoff
(m³/s)
Baseflow
(m³/s)
Total Flow
(m³/s)
78:30:00 0.000 0.000 0.000 0.000 0.183 0.183
78:45:00 0.000 0.000 0.000 0.000 0.182 0.182
79:00:00 0.000 0.000 0.000 0.000 0.180 0.180
79:15:00 0.000 0.000 0.000 0.000 0.179 0.179
79:30:00 0.000 0.000 0.000 0.000 0.178 0.178
79:45:00 0.000 0.000 0.000 0.000 0.176 0.176
80:00:00 0.000 0.000 0.000 0.000 0.175 0.175
80:15:00 0.000 0.000 0.000 0.000 0.173 0.173
80:30:00 0.000 0.000 0.000 0.000 0.172 0.172
80:45:00 0.000 0.000 0.000 0.000 0.171 0.171
81:00:00 0.000 0.000 0.000 0.000 0.169 0.169
81:15:00 0.000 0.000 0.000 0.000 0.168 0.168
81:30:00 0.000 0.000 0.000 0.000 0.167 0.167
81:45:00 0.000 0.000 0.000 0.000 0.165 0.165
82:00:00 0.000 0.000 0.000 0.000 0.164 0.164
82:15:00 0.000 0.000 0.000 0.000 0.163 0.163
82:30:00 0.000 0.000 0.000 0.000 0.161 0.161
82:45:00 0.000 0.000 0.000 0.000 0.160 0.160
83:00:00 0.000 0.000 0.000 0.000 0.159 0.159
83:15:00 0.000 0.000 0.000 0.000 0.158 0.158
83:30:00 0.000 0.000 0.000 0.000 0.156 0.156
83:45:00 0.000 0.000 0.000 0.000 0.155 0.155
84:00:00 0.000 0.000 0.000 0.000 0.154 0.154
84:15:00 0.000 0.000 0.000 0.000 0.153 0.153
84:30:00 0.000 0.000 0.000 0.000 0.152 0.152
84:45:00 0.000 0.000 0.000 0.000 0.150 0.150
85:00:00 0.000 0.000 0.000 0.000 0.149 0.149
85:15:00 0.000 0.000 0.000 0.000 0.148 0.148
85:30:00 0.000 0.000 0.000 0.000 0.147 0.147
85:45:00 0.000 0.000 0.000 0.000 0.146 0.146
86:00:00 0.000 0.000 0.000 0.000 0.145 0.145
86:15:00 0.000 0.000 0.000 0.000 0.143 0.143
86:30:00 0.000 0.000 0.000 0.000 0.142 0.142
86:45:00 0.000 0.000 0.000 0.000 0.141 0.141
87:00:00 0.000 0.000 0.000 0.000 0.140 0.140
Printed from the ReFH2 Flood Modelling software package, version 4.1.8879.22466
Page 12 of 14

Page 71

Time
(hh:mm:ss)
Rain
(mm)
Sewer Loss
(m³/s)
Net Rain
(mm)
Runoff
(m³/s)
Baseflow
(m³/s)
Total Flow
(m³/s)
87:15:00 0.000 0.000 0.000 0.000 0.139 0.139
87:30:00 0.000 0.000 0.000 0.000 0.138 0.138
87:45:00 0.000 0.000 0.000 0.000 0.137 0.137
88:00:00 0.000 0.000 0.000 0.000 0.136 0.136
88:15:00 0.000 0.000 0.000 0.000 0.135 0.135
88:30:00 0.000 0.000 0.000 0.000 0.134 0.134
88:45:00 0.000 0.000 0.000 0.000 0.132 0.132
89:00:00 0.000 0.000 0.000 0.000 0.131 0.131
89:15:00 0.000 0.000 0.000 0.000 0.130 0.130
89:30:00 0.000 0.000 0.000 0.000 0.129 0.129
89:45:00 0.000 0.000 0.000 0.000 0.128 0.128
90:00:00 0.000 0.000 0.000 0.000 0.127 0.127
90:15:00 0.000 0.000 0.000 0.000 0.126 0.126
90:30:00 0.000 0.000 0.000 0.000 0.125 0.125
90:45:00 0.000 0.000 0.000 0.000 0.124 0.124
91:00:00 0.000 0.000 0.000 0.000 0.123 0.123
91:15:00 0.000 0.000 0.000 0.000 0.122 0.122
91:30:00 0.000 0.000 0.000 0.000 0.121 0.121
91:45:00 0.000 0.000 0.000 0.000 0.120 0.120
92:00:00 0.000 0.000 0.000 0.000 0.120 0.120
92:15:00 0.000 0.000 0.000 0.000 0.119 0.119
92:30:00 0.000 0.000 0.000 0.000 0.118 0.118
92:45:00 0.000 0.000 0.000 0.000 0.117 0.117
93:00:00 0.000 0.000 0.000 0.000 0.116 0.116
93:15:00 0.000 0.000 0.000 0.000 0.115 0.115
Printed from the ReFH2 Flood Modelling software package, version 4.1.8879.22466
Page 13 of 14

Page 72

Appendix
Catchment descriptors
Name Value User-defined value used?
Area (km²) 5.61 No
ALTBAR 200 No
ASPBAR 155 No
ASPVAR 0.28 No
BFIHOST 0.6 No
BFIHOST19 0.51 No
DPLBAR (km) 3.05 No
DPSBAR (mkm-¹) 147.8 No
FARL 0.98 No
LDP 5.26 No
PROPWET 0.46 No
RMED1H 9.1 No
RMED1D 35.8 No
RMED2D 46.4 No
SAAR (mm) 771 No
SAAR4170 (mm) 810 No
SPRHOST 29.68 No
URBEXT2000 0 No
URBEXT1990 0 No
URBCONC 0 No
URBLOC 0 No
DDF parameter C -0.02 No
DDF parameter D1 0.46 No
DDF parameter D2 0.41 No
DDF parameter D3 0.26 No
DDF parameter E 0.25 No
DDF parameter F 2.2 No
DDF parameter C (1km grid value) -0.02 No
DDF parameter D1 (1km grid value) 0.48 No
DDF parameter D2 (1km grid value) 0.43 No
DDF parameter D3 (1km grid value) 0.29 No
DDF parameter E (1km grid value) 0.25 No
DDF parameter F (1km grid value) 2.15 No
Printed from the ReFH2 Flood Modelling software package, version 4.1.8879.22466
Page 14 of 14

Page 73

Appendix C
Scottish Water Asset Plans

Page 74

¯
The representation of physical assets and
the boundaries of areas in which Scottish
Water and others have
an interest does not necessarily imply
their true positions. For further details
contact the appropriate District office.
© Crown copyright and database rights 2025 OS AC0000824238.
You are granted a non-exclusive, royalty free, revocable
licence solely to view the Licensed Data for non-commercial purposes
for the period during which Scottish Water makes it available. You are
not permitted to copy, sub-license, distribute, sell or otherwise make
available the Licensed Data to third parties in any form. Third party
rights to enforce the terms of this licence shall be reserved to OS.
The Bridge
6 Buchanan Gate
Stepps
Glasgow
G33 6FB
Tel No: 08000 778 778
0 1010 20205 Meters SCALE:
Warning! Damaging a large diameter trunk main (12"/300mm and above) can result in loss of life and major water supply and water quality problems. If you're planning any extension work in the vicinity of any large diameter mains shown on our maps, you must contact Scottish Water to arrange a site visit 08000 778 778 WELL IN ADVANCE OF THE WORKS.Warning! Damaging a large diameter trunk main (12"/300mm and above) can result in loss of life and major water supply and water quality problems. If you're planning any extension work in the vicinity of any large diameter mains shown on our maps, you must contact Scottish Water to arrange a site visit 08000 778 778 WELL IN ADVANCE OF THE WORKS.Warning! Damaging a large diameter trunk main (12"/300mm and above) can result in loss of life and major water supply and water quality problems. If you're planning any extension work in the vicinity of any large diameter mains shown on our maps, you must contact Scottish Water to arrange a site visit 08000 778 778 WELL IN ADVANCE OF THE WORKS.Warning! Damaging a large diameter trunk main (12"/300mm and above) can result in loss of life and major water supply and water quality problems. If you're planning any extension work in the vicinity of any large diameter mains shown on our maps, you must contact Scottish Water to arrange a site visit 08000 778 778 WELL IN ADVANCE OF THE WORKS.Warning! Damaging a large diameter trunk main (12"/300mm and above) can result in loss of life and major water supply and water quality problems. If you're planning any extension work in the vicinity of any large diameter mains shown on our maps, you must contact Scottish Water to arrange a site visit 08000 778 778 WELL IN ADVANCE OF THE WORKS.Warning! Damaging a large diameter trunk main (12"/300mm and above) can result in loss of life and major water supply and water quality problems. If you're planning any extension work in the vicinity of any large diameter mains shown on our maps, you must contact Scottish Water to arrange a site visit 08000 778 778 WELL IN ADVANCE OF THE WORKS.Warning! Damaging a large diameter trunk main (12"/300mm and above) can result in loss of life and major water supply and water quality problems. If you're planning any extension work in the vicinity of any large diameter mains shown on our maps, you must contact Scottish Water to arrange a site visit 08000 778 778 WELL IN ADVANCE OF THE WORKS.
Date: 28/02/2025
Plotted By: Duncan.bowie@gondolinltd.co.uk
Craigburn Water & Wastewater PlansCraigburn Water & Wastewater Plans
1:1,323

Page 75

SCOTTISH WATER GIS EXTRANET WATER LEGEND 
This legend is to be used in conjunction with plots obtained from the SW GIS Extranet v1.0 - October 2020
SW Public
General
Fittings                  Pipes

Page 76

SCOTTISH WATER GIS EXTRANET                  WASTE WATER LEGEND 
This legend is to be used in conjunction with plots obtained from the SW GIS Extranet v1.0 - October 2020
SW Public
General 
Fittings                                                          Pipes

Page 77

Appendix D
Site Photography

Page 78

No embedded text on this page.

Page 79

No embedded text on this page.

Page 80

No embedded text on this page.

Page 81

No embedded text on this page.

Page 82

DRAWINGS

Page 83

Contains OS data © Crown copyright and database rights [2025]Contains OS data © Crown copyright and database rights [2025]
DRAWING NUMBER: REV:
REV BYBY CHK
SCALE:
DESCRIPTION
DATE:
FRA-001 Site Location Plan_01.dwg
DRAWING TITLE:
PROJECT:
DATE
CLIENT:
GONDOLIN LAND & WATER LTD
15 Quayside Street
Edinburgh
EH6 6EJ
Registered Company No. SC706920
LEGEND
N
© Crown copyright and database rights [2025] Ordnance Survey 0100031673 Crown copyright and database rights [2025] Ordnance Survey 0100031673
© This drawing and its content are the copyright of Gondolin Land & Water Ltd and may not be edited or reproduced except by prior written consent.  Gondolin accepts no liability for any amendments made by other persons.© This drawing and its content are the copyright of Gondolin Land & Water Ltd and may not be edited or reproduced except by prior written consent.  Gondolin accepts no liability for any amendments made by other persons.© This drawing and its content are the copyright of Gondolin Land & Water Ltd and may not be edited or reproduced except by prior written consent.  Gondolin accepts no liability for any amendments made by other persons.© This drawing and its content are the copyright of Gondolin Land & Water Ltd and may not be edited or reproduced except by prior written consent.  Gondolin accepts no liability for any amendments made by other persons.
DRAWING STATUS:
0000 04/25 INITIAL ISSUE DBDB ZRZR
STUART HESLOP
CRAIGBURN HOUSE
SITE LOCATION PLAN
1:2,000 @ A3 MARCH 2026
FRA-001 0101
FOR PLANNING
0 12.5 2525 37.5 50m 7575 100 125
Metres 1:1,250
PLANNING BOUNDARY
ASSESSMENT AREA
0101 03/26 REVISED ISSUE DBDB ZRZR

Page 84

Craigburn House
North Lodge
Springside Cottage
FBFB
Witches Knowe
S-01
S-02
CS-04
CS-03
CS-02
CS-01
Contains OS data © Crown copyright and database rights [2025]
DRAWING NUMBER: REV:
REV BYBY CHK
SCALE:
DESCRIPTION
DATE:
FRA-002 Flood Risk Summary.dwg
DRAWING TITLE:
PROJECT:
DATE
NOTES
LEGEND
CLIENT:
GONDOLIN LAND & WATER LTD
15 Quayside Street
Edinburgh
EH6 6EJ
Registered Company No. SC706920
N
© Crown copyright and database rights [2025] Ordnance Survey 0100031673
© This drawing and its content are the copyright of Gondolin Land & Water Ltd and may not be edited or reproduced except by prior written consent.  Gondolin accepts no liability for any amendments made by other persons.© This drawing and its content are the copyright of Gondolin Land & Water Ltd and may not be edited or reproduced except by prior written consent.  Gondolin accepts no liability for any amendments made by other persons.© This drawing and its content are the copyright of Gondolin Land & Water Ltd and may not be edited or reproduced except by prior written consent.  Gondolin accepts no liability for any amendments made by other persons.
DRAWING STATUS:
0000 04/25 INITIAL ISSUE DBDB ZRZR
STUART HESLOP
CRAIGBURN HOUSE
FLOOD RISK SUMMARY
1:750 @ A2 MARCH 2026
FRA-002 0000
FOR PLANNING
0 7.5 1515 22.5 30m 4545 6060 7575
Metres 1:750
PLANNING BOUNDARY
LAND OWNERSHIP BOUNDARY
CRAIG BURN
EXISTING MAJOR CONTOURS
(2.5m INTERVAL)
EXISTING MINOR CONTOURS
(0.5m INTERVAL)
EXISTING POND
1.1. TOPOGRAPHY DERIVED FROM LIDAR DATA
SOURCED FROM THE SCOTTISH REMOTE
SENSING PORTAL.
OVERLAND FLOWPATH
EXISTING BRIDGE
EXISTING WEIR
RUNOFF FOLLOWS NATURAL
TOPOGRAPHY TO THE SOUTH
CROSS-SECTIONCS-XX
POND OUTFLOW WEIR
HISTORIC CURLING POND
CRAIG BURN CONTAINED WITHIN
ARTIFICIALLY STRAIGHTENED
AND DEEPENED CHANNEL
SCOTTISH WATER
PUMPING STATION
BLOCKAGES WOULD OCCUR
AT UPSTREAM BRIDGE DUE TO
RELATIVELY SMALL CAPACITY
IN A BLOCKAGE SCENARIO EXCEEDANCE
FLOWS OVERTOP BRIDGE TO RETURN TO
CHANNEL IMMEDIATELY DOWNSTREAM
CHANNEL OF THE CRAIG BURN HAS
MORE THAN SUFFICIENT CAPACITY TO
CONTAIN DESIGN FLOOD FLOWS
DEVELOPMENT SITE
CONSIDERED NOT TO BE
IN A FLOOD RISK AREA
EXCEEDANCE FLOWS
FROM POND RETURN TO
CHANNEL DOWNSTREAM
ASSESSMENT AREA
RESIDUAL EXCEEDANCE
FLOWS RETURN TO
CHANNEL DOWNSTREAM
EXCEEDANCE FLOWPATH
0101 03/26 REVISED ISSUE DBDB ZRZR

Page 85

Civil Engineering and Environmental Solutions 
Gondolin Land and Water Ltd is a small environmental
and engineering consultancy business based in Scotland
with coverage throughout the UK. 
Office Address:
15 Quayside Street
Edinburgh
EH6 6EJ 
Registered Company No.
SC706920 
Sectors:
Onshore Renewables & Storage | Infrastructure | Mining and Minerals
Property & Urban Regeneration | Retail, Industrial & Manufacturing | 
Waste Management

Page 86

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – DIA| 30/03/2026
Registered Company No. SC706920
1
Craigburn House, Rait – Proposed
Residential Development
Drainage Impact Assessment  
Client: Stuart Heslop
Project/Proposal No: GON.1123.0578
Version: 1
Date: 30/03/2026

Page 87

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – DIA| 30/03/2026
Registered Company No. SC706920
2
Document Information
Project Name: Craigburn House, Rait – Proposed Residential Development
Document Title: Drainage Impact Assessment
Client Name: Stuart Heslop
Document Status: Final for Issue
Author: Duncan Bowie
Reviewed: Zak Ritchie
Approved: Zak Ritchie
Approver Qualifications: BEng(hons), MSc, C.WEM, C.Eng, MCIWEM
Date: 30/03/2026
Version: 1
Project/Proposal Number: GON.1123.0578  
Revision History
Version Date Authored Reviewed Approved Notes
1 30/03/2026 Duncan Bowie Zak Ritchie Zak Ritchie For Issue                         
The contents of this document are confidential to the addressed recipient and may not be revealed. This
document may contain confidential information. If received in error, please delete it without making or distributing
copies. Opinions and information that do not relate to the official business of Gondolin Land and Water Ltd,
registered at 26 Leith Walk EH6 5AA, are not endorsed by the company.
Limitation: This document has been prepared exclusively for the use of the Client and any party with whom a
warranty agreement has been executed, or an assignment has been agreed. No other parties may rely on the
contents of this document without written approval from Gondolin Land and Water Ltd for which a payment may
be applicable. Gondolin Land and Water Ltd accepts no responsibility or liability for the consequences of use of
this document for any purpose other than that for which it was authorised, nor the use of this document by any
third party with whom an agreement has not been reached.
© Copyright 2026 Gondolin Land and Water Ltd. The concepts and information contained in this document are
the property of the company. Use or copying of this document in whole or in part without the written permission
of Gondolin Land and Water Ltd constitutes an infringement of copyright unless otherwise explicitly agreed by
contract.

Page 88

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – DIA| 30/03/2026
Registered Company No. SC706920
3
Contents
Document Information 2
Contents 3
1. Introduction 5
1.1 Preamble 5
1.2 Site Context and Proposed Development 5
1.3 Topography 5
1.4 Geology and Hydrogeology 5
1.5 Existing Hydrology & Drainage System 6
2. Proposed Surface Water Drainage Design 7
2.1 Design Overview 7
2.2 Design Criteria 7
2.3 SuDS Performance Review 9
2.4 Outline Maintenance Schedule 10
3. Wastewater Drainage Design 11
3.1 Overview 11
3.2 Wastewater Loading Calculations 11
3.3 Soil Infiltration Rate 12
3.4 Soakaway Sizing 12
3.5 Pipe Network Design 12
4. Closure 12

Page 89

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – DIA| 30/03/2026
Registered Company No. SC706920
4
Document References
Tables
Table 1 Hydrological Summary ...................................................................................................................... 6
Table 2  Catchment Hydrological Summary ................................................................................................ 6
Table 3 Suitability of Surface Water Disposal Methods ............................................................................... 7
Table 4 SuDS Water Quality Design Criteria: Index Approach Review ...................................................... 8
Table 5 Soakaway - Provisional Summary Design Details ........................................................................... 9
Table 6 SuDS System - Hydraulic Modelling Summary ................................................................................. 9
Table 7 Soakaway Outline Maintenance Requirements .......................................................................... 10
Table 8 Proposed Provisional Treatment Standards .................................................................................. 11
Table 9 Wastewater Loading Calculations ................................................................................................ 11
Appendices
Appendix A – PKC Certification 
Appendix B – Scottish Water Asset Plans 
Appendix C – MicroDrainage Modelling Extracts 
Appendix D – Site Photography 
Appendix E – Wastewater Loading Calculations 
Drawings 
Drawing DIA-001 – Site Location Plan 
Drawing DIA-002 – Hydrological Overview 
Drawing DIA-003 – Proposed Drainage Layout 
Drawing DIA-004 – Typical Drainage Details

Page 90

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – DIA| 30/03/2026
Registered Company No. SC706920
5
1. Introduction
1.1 Preamble
Gondolin Land and Water Ltd (Gondolin) have been appointed by Mr Stuart Heslop(the Client) to
prepare a Drainage Impact Assessment (DIA) report in support of a planning application for the
development of a single residential dwelling and associated works on land at Craigburn House,
Fingask, Rait, Perth & Kinross, PH2 7RU. 
This report provides the relevant design information for the proposed site surface water drainage /
SuDS scheme taking due cognisance of local / national drainage design guidance (CIRIA Report
C753), Perth and Kinross Councils supplementary guidance1. A signed compliance certificate is
included in Appendix A, to certify that this assessment has been carried out in accordance with the
relevant guidance and legislation. 
The site was visited in January 2025 by a suitably qualified Civil Engineer to inform the assessment and
assessment overseen by a Chartered Hydrologist / Civil Engineer with >14 years experience of
undertaking drainage designs in Scotland. 
1.2 Site Context and Proposed Development
The development site is located to the south of the existing Craigburn properties at approximate
National Grid Reference (NGR): NO 23331 27173. The proposals are for 1no. residential dwelling on a
0.13ha plot in the east of the site neighbouring the existing properties. 
The site is bounded by the existing Craigburn properties to the north, a minor road to the northwest
and agricultural land on all other sides. Access is provided from the existing track bounding the site
to the northeast or from the minor road in the west. The site currently consists of improved grassland
surrounded by large hedges. 
A site location plan is included as Drawing DIA-001. 
1.3 Topography
An assessment of site topography has been undertaken using 1m resolution LiDAR data sourced from
the Scottish Remote Sensing Portal in conjunction with on-site observations and measurements. The
site slopes down to the south at an approximate gradient of 1 in 15. The maximum elevation of
20.5mAOD is located in the north next to the existing public road and the approximate minimum
elevation of 14.8mAOD is found at the southern extent. 
1.4 Geology and Hydrogeology
1.4.1 Geology
1.4.1.1 Superficial
Review of the British Geological Survey2 (BGS) online geology maps indicates that superficial deposits
at the proposed development site are Glaciofluvial Ice Contact Deposits of gravel, sand and silt. The
area around the site takes the appearance of an Alluvial Fan, formed on the Carse of Gowrie around
the apex of the constricted upstream channel of the Craig Burn. 
1.4.1.2 Bedrock
Review of the BGS online geology maps shows that the bedrock geology at the development area
is of the Glenvale Sandstone Formation. Brown, yellow, read, purple and cream feldspathic
sandstones of the Devonian Epoch. Approximately 30m upgradient to the northwest, the bedrock
transitions to andesite and pyroxene of the Ochil Volcanic Formation. 
1 Perth & Kinross Council (2021) Flood Risk and Flood Risk Assessments
2 British Geological Survey (2025) Natural Environment Research Council – GeoIndex Onshore Viewer, available at:
https://www.bgs.ac.uk/map-viewers/geoindex-onshore/ (accessed on 19th December 2025)

Page 91

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – DIA| 30/03/2026
Registered Company No. SC706920
6
1.4.2 Hydrogeology
Review of the BGS online hydrogeology maps indicates that the underlying bedrock at the
development area is of the Stratheden Group and hence is a moderately productive aquifer with
Sandstone, partly pebbly with subordinate siltstone and mudstone producing moderate amounts of
groundwater through intergranular flow. 
1.5 Existing Hydrology & Drainage System
Surface runoff from the site would follow the natural topography to the south in the form of sheet flow,
potentially with some minor gullying towards the base of the hedges on the southwestern boundary. 
A hydrological summary and characteristics of the site are shown in Table 1 below. The data is taken
from the Flood Estimation Handbook (FEH)3 Web Service and the point characteristics of the site has
been delineated from NGR: NO 23369 27197. 
Table 1 Hydrological Summary
Catchment Location
(NGR) BFIHOST191 PROPWET2 SAAR3 
(mm)
NO 23369 27197 0.424 0.46 709
1BFIHOST19 = Base Flow Index derived using the UK Hydrology of Soil Types (Host) classification (released 2019)
2PROPWET = Proportion of Time the Soil Moisture Deficit (SMD) was equal to, or below, 6mm during 1961-1990
3SAAR= Standard Annual Average Rainfall
A hydrological overview of the site is available in Drawing DIA-002. 
Review of the Flood Estimation Handbook (FEH) Web Service4 and other available mapping shows
that the Craig Burn passes the site approximately 10m to the northeast of the development boundary.
The FEH Web Service provides a catchment of 5.61km2 for the Craig Burn where it passes the
development site.  It was observed that the burn had been artificially straightened and deepened as
is typical for ‘pow’ watercourses in the Gowrie region. No other open watercourses are recorded
within the vicinity of the proposed development area. 
A hydrological summary and characteristics for the Craig Burn catchment at the development site
are shown in Table 2 below. The data shown is taken from the FEH Web Service and the catchment
characteristics of the site have been delineated from NGR: NO 23400 27200, a point in the
watercourse immediately adjacent to the site. 
Table 2  Catchment Hydrological Summary 
Waterbody
Catchment
Area
(km2)
SAAR1
(mm)
URBEXT2
(%) PROPWET3 SPRHOST4
(%)
ALTBAR5
(m)
Craig Burn 5.61 771 0 0.46 29.68 200
1SAAR = Standard Annual Average Rainfall between 1961-1990
2URBEXT = Extent of Urban and Suburban Land Cover (1990)
3PROPWET = Proportion of Time the Soil Moisture Deficit (SMD) was equal to, or below, 6mm during 1961-1990
4SPRHOST = Standard Percentage Runoff using UK Hydrology of Soil Types (HOST) Classification 
5ALTBAR = Mean Catchment Altitude
The FEH data indicates that the Craig Burn catchment experiences a moderate SAAR value for a
Scottish catchment and that the catchment is essentially rural. An SPRHOST value of 29.68% indicates
a low-moderate runoff potential. 
The flood risk presented by the Craig Burn has been considered in a separate Flood Risk Assessment
(FRA) report also produced by Gondolin (separate submission document which accompanies the
planning application). 
3 UK Centre for Ecology & Hydrology (2024) Flood Estimation Handbook Web Service: https://fehweb.ceh.ac.uk/ (accessed: 19th
December 2025)
4 UK Centre for Ecology and Hydrology (2025) Flood Estimation handbook Web Service, available at: https://fehweb.ceh.ac.uk/
(accessed on 19th December 2025)

Page 92

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – DIA| 30/03/2026
Registered Company No. SC706920
7
2.  Proposed Surface Water Drainage Design
2.1 Design Overview
The management of surface water drainage from the development has been developed taking due
cognisance of national and local guidance – as follows:
 CIRIA, Report C753 – the SuDS Manual, 2015
 CIRIA, Report C635 – Designing for Exceedance in Urban Drainage, Good Practice (2006)
 Perth and Kinross Council – Flood Risk and Flood Risk Assessments, 2021
 SEPA, WAT-RM-08 – Sustainable Urban Drainage Systems (SuDS), 2019
 Scottish Water – Sewers for Scotland v4, 2018
 Scottish Government – Building Standards Technical Handbook, 2026
 Building Research Establishment (BRE) – Digest 365, Soakaway Design
The proposed drainage / SuDS scheme for the site is for a surface water drainage soakaway in the
southeast of the site to allow storm water to safely discharge to ground. The system will manage
surface water runoff from all impermeable areas of the site. Rainwater downpipes shall be installed
on the proposed dwelling house to convey surface water runoff directly to the drainage system. The
proposed access and parking area will be constructed from unbound permeable material to allow
direct infiltration to ground, as such these areas are not included within the drainage / SuDS scheme
for the site. 
The Proposed Drainage Layout scheme for the development is provided as Drawing DIA-003 and
typical drainage details are shown on Drawing DIA-004. 
2.2 Design Criteria
2.2.1 Drainage Discharge Locations
In accordance with the aforementioned guidance documents, the hierarchy for favoured disposal
options of surface water runoff from development sites is as follows: 
1. Infiltration to Ground;
2. Discharge to Surface Waters; or
3. Discharge to Sewer.
Table 3 below discusses the disposal method suitability in the context of the site and proposed
development. 
Table 3 Suitability of Surface Water Disposal Methods 
Surface Water
Disposal Method Suitability Description
Method
Suitable?
(Y/N)
Infiltration to Ground
As outlined in Section 1.4.1 superficial deposits at the site are Glaciofluvial
ice contact deposits of gravel, sand and silt. As such, the geology is likely
to be favourable to infiltration-based SuDS techniques. 
Y
Surface Water
Discharge
The Craig Burn runs adjacent to the site on the opposite side of the
existing access to the northeast and could serve as a potential outlet
option.
Y
Sewer Discharge
Scottish Water Asset Plans have been sourced for the development site
and have been appended to this document as Appendix B. No surface
water or combined sewers are available for a connection to be made. 
N

Page 93

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – DIA| 30/03/2026
Registered Company No. SC706920
8
Review of Table 3 above confirms that infiltration to ground is the most suitable method for the
development site and is also the most favoured solution within the hierarchy of options. Therefore,
infiltration to ground is chosen as the proposed discharge method for the site. 
Infiltration testing will be conducted at the post planning stages of development to confirm the
viability of the method and inform the final drainage design. This requirement can readily be secured
via an appropriately worded planning condition attached to a planning consent. In the unlikely event
infiltration to ground would not be viable, a discharge to surface waters at the adjacent Craig Burn
would also be feasible. 
2.2.2 Storm Events and Hydraulic Design Criteria
The hydraulic design of the system has been prepared in accordance with CIRIA Report C753 and
Section 2.6 of Sewers for Scotland, as follows: 
 No flooding occurs in conveyance features or in any part of the site up to the 1:30-year event;
and,
 Where flooding occurs in the 1:200-year event (plus 39% climate change), measures are
taken to ensure that access and egress to the site for emergency vehicles is not impeded,
and appropriate overland flood routes are considered / integrated into the site layout design.
In addition, the following criteria have also been applied:
 None of the system ‘surcharges’ under the 1:2-year event;
 The proposed soakaway area is sized to contain and safely discharge the 1:200-year event
(plus 39% climate change) to ground without flooding.
These criteria provide a betterment to those required by Sewers for Scotland. 
All drainage features have been sized using industry standard methods and the MicroDrainage
software suite. 
2.2.3 Drainage Exceedance Considerations
Exceedance flow routes from the proposed soakaway and drainage network would follow the
natural topography of the land and flow overland to the southeast with no risk to neighbouring
properties – i.e. flows would follow the existing natural hydrological regime.
2.2.4 Water Quality Review (Simple Index Approach)
In accordance with CIRIA Report C753, it is necessary to undertake a ‘Water Quality Risk
Management’ assessment to determine the suitability of SuDS methods from a water quality
perspective. The approach outlined below is based on the ‘Simple Index Approach’ for discharge to
groundwater as detailed in the SuDS Manual (Section 26.7, Tables 26.2 and 26.4). 
Table 4 below compares the SuDS Mitigation Indices (MI) against the maximum Pollution Hazard Index
(PI) for the proposed development. This is based on the application of a constructed soakaways with
suitable underlying (unsaturated) soil media of at least 300mm depth. 
Table 4 SuDS Water Quality Design Criteria: Index Approach Review 
Land Use
Pollution Hazard and SuDS Mitigation Indices Comparison
Total Suspended Solids
(TSS) Metals Hydro-Carbons
Pollution
Index
Mitigation
Index
Pollution
Index
Mitigation
Index
Pollution
Index
Mitigation
Index
Residential Roofs
(accommodation) 0.2 0.4 0.2 0.4 0.05 0.4
Notes: Mitigation Index based on permeable paving discharging to groundwater
The SuDS Mitigation Index offered by the proposed SuDS is ≥ Pollution Hazard Index therefore the water
quality assessment criteria is satisfied.

Page 94

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – DIA| 30/03/2026
Registered Company No. SC706920
9
2.3 SuDS Performance Review
2.3.1 Key Design Details 
The SuDS system has been sized to accommodate the 1:200yr plus 39% climate change event, and
details are presented on Drawing DIA-003 and Drawing DIA-004. The key design parameters /
geometry is summarised in Table 5 below. 
Table 5 Soakaway - Provisional Summary Design Details 
Parameter Unit Value Notes
Total depth m 1.4 Topsoil depth + soakaway depth
Minimum topsoil depth mm 200 Above soakaway
Gravel storage area depth mm 1200 Cover level – wrapped in a permeable geotextile / liner
Minimum surface area m2 58.5 Measured from AutoCAD drawing
Storage porosity  - 35% Standard value as per CIRIA report C753
Storage volume m3 24.57 Calculated as: (58.5m2 x 1.2m x 35%)
Contributing impermeable
area m2 214 Impermeable developed areas of site with a runoff
coefficient of 1 applied as a conservative estimate  
Design infiltration rate m/hr 0.005
Mid-range estimate for silt loam. Does not include Safety
Factor applied in accordance with best practice
guidance – refer to Appendix C
2.3.2 Hydraulic Analysis
The proposed SuDS infiltration system has been modelled using the industry standard MicroDrainage
software suite and a summary of the modelling results is included as Table 6 below. 
Table 6 SuDS System - Hydraulic Modelling Summary
Return Period
Event (1 in X)
Max. Water
Depth (m)
Freeboard
Allowance
(mm)
Storage
Volume
(m3)
Critical Storm
Duration
(hours)
Half Drain Time
(mins)
2 0.251 949 3.8 16 546
10 0.356 844 6.0 16 818
30 0.450 750 7.9 16 1041
100 0.579 621 10.5 24 1319
200 0.668 532 12.4 24 1500
200 + 39% CC 0.977 223 18.7 36 2046
1000 0.897 303 17.0 24 1920
The results above confirm that runoff from the impermeable areas of development can be
adequately contained within the 1200mm deep soakaway storage depth area for all rainfall events
up to and including the design 200yr + 39% climate change event. Suitable freeboard depth
allowance is also included within the design for all design storm events. 
Full copies of the hydraulic modelling and model details are enclosed as Appendix C. 
As the consequences of failure are minor for this site, a factor of safety of 1.5 has been applied as per
Table 25.2 of the SuDS Manual. This also factors in a reduction in soakaway performance over time
due to siltation. Furthermore, silt traps will be installed on the incoming upstream surface water pipe
runs to allow for pre-settlement to reduce silt ingress into the system. 
MicroDrainage modelling software calculated a maximum inflow to the pipe network of 13.8l/s for
the worst-case 15 min summer storm event. The capacity of the pipe network was checked against

Page 95

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – DIA| 30/03/2026
Registered Company No. SC706920
10
published tables for the hydraulic design of pipes5 using the Colebrook-White equation method.
Design assumed 150mm UPVC pipes and a minimum gradient of 1:200. This provides a maximum
flowrate of 15.3l/s, and as such provides adequate capacity to prevent overloading of the network.
It is noted that this is a very conservative estimate given that greater gradients are easily achievable
at this site. 
2.4 Outline Maintenance Schedule
2.4.1 Overview 
To ensure efficient operation of the proposed surface water management / SuDS scheme, drainage
components should be inspected and maintained throughout the life of the development. Regular
inspection / maintenance will ensure efficient operation and prevent potential failure / blockage of
drainage components. 
The following provisional maintenance plan has been developed from best practice guidance,
professional experience and information provided in CIRIA Report C753 (The SuDS Manual).
All drainage components will be retained under private ownership, with the Applicant remaining
responsible for ongoing maintenance. This maintenance schedule will be integrated into the overall
site operating and maintenance strategy and tailored / refined over time as required. 
The following sections provide maintenance actions for specific drainage elements. 
2.4.2 Surface Water Soakaway
Table 7 below provides the inspection and maintenance recommendations set out in Table 13.1 of
CIRIA Report C753 for Soakaways.
Table 7 Soakaway Outline Maintenance Requirements 
Maintenance Schedule  Required Action Typical Frequency
Regular Maintenance 
Inspect for sediment and debris in pre-
treatment components and floor of inspection
tube or chamber and inside of concrete
manhole rings
Annually
Cleaning of gutters and any filters on
downpipes
Annually (or as required
based on inspections)
Trimming any roots that may be causing
blockages  Annual (or as required)
Occasional Maintenance
Remove sediment and debris from pre-
treatment components and floor of inspection
tube or chamber and inside of concrete
manhole rings
As required, based on
inspections
Remedial Actions
Reconstruct soakaway and/or replace or
clean void fill if performance deteriorates or
failure occurs
As required
Replacement of clogged geotextile (will
require reconstruction of soakaway in some
circumstances)
As required
Monitoring
Inspect silt traps and note rate of sediment
accumulation 
Monthly in the first year
and then annually
Check soakaway to ensure emptying is
occurring  Annually 
5 HR Wallingford and D.I.H Barr (2006) Tables for the hydraulic design of pipes, sewers and channels, 8th Edition, Volume I & II

Page 96

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – DIA| 30/03/2026
Registered Company No. SC706920
11
2.4.3 Inspection Chambers and Manholes
It is recommended that the inspection chamber and manhole covers are lifted at least half yearly to
check for debris / silt accumulations, and to check the drainage runs are flowing freely. 
Any silt / debris accumulations should be manually removed, and jet washed where required. 
3. Wastewater Drainage Design
3.1 Overview
The proposed development will generate wastewater flows in the form of ‘domestic’ sewage and
thus a wastewater drainage design has been prepared.
In terms of wastewater drainage disposal, the favoured hierarchy of options is as follows:
1. Discharge to public sewer
2. Discharge to ground via soakaway
3. Discharge to surface waters
4. Discharge to raised soakaway mound
Scottish Water asset plans have been sourced for the site and have been appended to this document
as Appendix B. It is confirmed that there are no public sewers in the vicinity of the development to
which a connection could be made. 
The Craig Burn could in principle accept a treated wastewater discharge depending on dilution rates,
catchment area etc however the superficial deposits present at the site indicate that discharge to
ground (Option 2) is likely to be feasible and this is the preferred choice over Options 3 and 4. 
As such the proposed Wastewater Drainage Scheme is for wastewater to be collected from proposed
dwelling via conventional sealed pipework which will discharge to a EN12566 (Part 3) Certified
Secondary Treatment plant providing provisional treatment standards as outlined in Table 8 below. 
Table 8 Proposed Provisional Treatment Standards
Parameter Unit Value
BOD Discharge Limit mg/l 10
Ammonia (as N) Discharge Limit mg/l 5
Suspended Solids Discharge Limit  mg/l 20
The final treatment standards would be confirmed at the detailed design / post planning stages
through a formal EASR Application made to SEPA.
3.2 Wastewater Loading Calculations 
With reference to British Water Flows and Loads 4 a summary of the wastewater loading calculations
is outlined in Table 9 below. Full calculations are provided in Appendix E for reference. 
Table 9 Wastewater Loading Calculations
Parameter Unit Value Notes
No of units - 1 Single domestic dwelling
Total Population Equivalent
(p.e.) - 5 As specified by SEPA in WAT-G-057 Guidance
Daily flow per person l 150 As per British Flows and Loads 4
Total maximum daily flow l 750  p.e. multiplied by daily flow per person

Page 97

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – DIA| 30/03/2026
Registered Company No. SC706920
12
Parameter Unit Value Notes
Instantaneous Average
Flow l/s 0.0087 Over 24-hour period
Peak Flow Rate l/s 0.0217 2.5x multiplication factor as per Scottish Water advice
3.3 Soil Infiltration Rate
Review section 1.4.1.1 indicates that the site is underlain by Glaciofluvial Ice Contact Deposits of
gravel, sand and silt. The immediate area around the site sits on an alluvial fan formed where the
Craig Burn drops from the Sidlaw Hills onto the Carse of Gowrie. Alluvial fans are typically a formed of
a wide ranging diamicton of clay through to boulders, but predominantly consist of sand, gravel and
silt. As such, infiltration is likely to be feasible at the site. However, no specific infiltration testing has
been conducted and therefore the conservative mid-range assumption of 70s/mm has been made.
This allows for a precautious approach to the wastewater soakaway design. 
3.4 Soakaway Sizing
As per Scottish Building Standards the soakaway is sized via the following formula: 
𝐴 = 𝑉𝑝 𝑥 𝑝.𝑒 𝑥 0.20 
Where:   A = Surface Area in (m2)  
Vp = Soil Percolation Rate in (s/mm)  
p.e. = Total Population Equivalent  
0.2 = reduction factor for use of a Secondary Treatment Plant
Based on the above formula and with reference to Table 9 previously the minimum required area of
the soakaway is 70m2. 
The proposed field drainage soakaway is located more than 10m from any surface water body and
more than 5m from the proposed dwelling house and the client’s land ownership boundary. 
Soil percolation rate testing will be conducted at the post planning stages (and secured via an
appropriately worded planning conditions) to validate the infiltration rate adopted and it is noted
there remains additional space within the site to extend the sizing if required. In the highly unlikely
event the soil percolation rate testing indicates a discharge to ground is not viable then a treated
wastewater discharge to the adjacent Craig Burn would be pursued as a ‘back up’ option.
3.5 Pipe Network Design
In accordance with Sewers for Scotland 4, the wastewater drainage pipes are to be minimum 150mm
diameter and the alignment has a minimum gradient of 1:60 to the treatment plant.
4. Closure
Gondolin Land and Water Ltd (Gondolin) has been appointed by Mr Stuart Heslop (the Client) to
prepare a Drainage Impact Assessment (DIA) report in support of a planning application for the
development of a dwelling house and associated works on land at Craigburn, Fingask, Rait, Perth &
Kinross, PH2 7RU. 
This report provides the relevant design information for the proposed site surface water drainage /
SuDS scheme taking due cognisance of local / national drainage design guidance (CIRIA Report
C753), Perth and Kinross Council specific guidance and Scottish Water Sewers for Scotland 4th Edition.

Page 98

Gondolin Land and Water Ltd | Craigburn House, Rait – Proposed Residential Development – DIA| 30/03/2026
Registered Company No. SC706920
13
The site was visited in January 2025 by a suitably qualified Civil Engineer to inform the assessment and
assessment overseen by a Chartered Hydrologist / Civil Engineer with >14 years’ experience of
undertaking drainage designs in Scotland. 
A conservative approach has been adopted within the design by incorporating appropriate factors
of safety, adopting a conservative infiltration rate at the SuDS location, inclusion of a freeboard
allowance and inclusion of a +39% climate change uplift. 
Additionally, wastewater drainage arising from the site has been incorporated into the site design
and details presented in this assessment. The wastewater will be routed via a wastewater treatment
system, to discharge to ground via soakaway and conservative soil percolation rates have been used.
Taking all the above into account it is considered there is no impediment to the development
proposals being granted planning permission on the grounds of surface water or wastewater
drainage provision.

Page 99

APPENDICES

Page 100

Appendix A
PKC Certification

Page 101

45
Appendix B - Assessment Compliance Certification and
Insurance
Assessment	Compliance	Certification
I	certify	that	all	reasonable	skill,	care	and	attention	has	been	
exercised in undertaking the attached Flood Risk Assessment/
Drainage Impact Assessment/Surface Water Drainage Design*
(delete as appropriate).  The documentation has been prepared
for the below noted development in accordance with the PKC
Developers’ Guidance Note on Flooding and Drainage.
Planning Application Number
Name and Address of Organisation Preparing this Assessment
Signed
Name
Name of Development
Craigburn House - Proposed Residential Development
Address of Development
Craigburn
Fingask, Rait,
Perth & Kinross, PH2 7RU
N/A
Edinburgh, EH6 5AA
26 Leith Walk
Gondolin Land & Water Ltd
Zak Ritchie
Stuart HeslopStuart Heslop
Name of Developer
Managing Director
Position Held

Page 102

46
Engineering	Qualification(1)
(1) Chartered Engineer or equivalent from an appropriate Engineering Institution.
Insurance
Please attach a copy of your professional indemnity
insurance policy to this document.
C.Eng, C.WEM, MCIWEM
Date
30/03/2026

Page 103

Appendix B
Scottish Water Asset Plans

Page 104

¯
The representation of physical assets and
the boundaries of areas in which Scottish
Water and others have
an interest does not necessarily imply
their true positions. For further details
contact the appropriate District office.
© Crown copyright and database rights 2025 OS AC0000824238.
You are granted a non-exclusive, royalty free, revocable
licence solely to view the Licensed Data for non-commercial purposes
for the period during which Scottish Water makes it available. You are
not permitted to copy, sub-license, distribute, sell or otherwise make
available the Licensed Data to third parties in any form. Third party
rights to enforce the terms of this licence shall be reserved to OS.
The Bridge
6 Buchanan Gate
Stepps
Glasgow
G33 6FB
Tel No: 08000 778 778
0 1010 20205 Meters SCALE:
Warning! Damaging a large diameter trunk main (12"/300mm and above) can result in loss of life and major water supply and water quality problems. If you're planning any extension work in the vicinity of any large diameter mains shown on our maps, you must contact Scottish Water to arrange a site visit 08000 778 778 WELL IN ADVANCE OF THE WORKS.Warning! Damaging a large diameter trunk main (12"/300mm and above) can result in loss of life and major water supply and water quality problems. If you're planning any extension work in the vicinity of any large diameter mains shown on our maps, you must contact Scottish Water to arrange a site visit 08000 778 778 WELL IN ADVANCE OF THE WORKS.Warning! Damaging a large diameter trunk main (12"/300mm and above) can result in loss of life and major water supply and water quality problems. If you're planning any extension work in the vicinity of any large diameter mains shown on our maps, you must contact Scottish Water to arrange a site visit 08000 778 778 WELL IN ADVANCE OF THE WORKS.Warning! Damaging a large diameter trunk main (12"/300mm and above) can result in loss of life and major water supply and water quality problems. If you're planning any extension work in the vicinity of any large diameter mains shown on our maps, you must contact Scottish Water to arrange a site visit 08000 778 778 WELL IN ADVANCE OF THE WORKS.Warning! Damaging a large diameter trunk main (12"/300mm and above) can result in loss of life and major water supply and water quality problems. If you're planning any extension work in the vicinity of any large diameter mains shown on our maps, you must contact Scottish Water to arrange a site visit 08000 778 778 WELL IN ADVANCE OF THE WORKS.Warning! Damaging a large diameter trunk main (12"/300mm and above) can result in loss of life and major water supply and water quality problems. If you're planning any extension work in the vicinity of any large diameter mains shown on our maps, you must contact Scottish Water to arrange a site visit 08000 778 778 WELL IN ADVANCE OF THE WORKS.Warning! Damaging a large diameter trunk main (12"/300mm and above) can result in loss of life and major water supply and water quality problems. If you're planning any extension work in the vicinity of any large diameter mains shown on our maps, you must contact Scottish Water to arrange a site visit 08000 778 778 WELL IN ADVANCE OF THE WORKS.
Date: 28/02/2025
Plotted By: Duncan.bowie@gondolinltd.co.uk
Craigburn Water & Wastewater PlansCraigburn Water & Wastewater Plans
1:1,323

Page 105

SCOTTISH WATER GIS EXTRANET WATER LEGEND 
This legend is to be used in conjunction with plots obtained from the SW GIS Extranet v1.0 - October 2020
SW Public
General
Fittings                  Pipes

Page 106

SCOTTISH WATER GIS EXTRANET                  WASTE WATER LEGEND 
This legend is to be used in conjunction with plots obtained from the SW GIS Extranet v1.0 - October 2020
SW Public
General 
Fittings                                                          Pipes

Page 107

Appendix C
MicroDrainage Modelling Results

Page 108

Gondolin Land & Water Ltd Page 1
Craig Burn
Surface Water Soakaway
26 Leith Walk
Edinburgh
EH6 5AA
Date 27/02/2026 Designed by DB
File CRAIGBURN HOUSE SOAKAWA... Checked by ZR
Innovyze Source Control 2020.1.3
Rainfall Details
©1982-2020 Innovyze
Rainfall Model FEH
Return Period (years) 200
FEH Rainfall Version 2013
Site Location GB 323369 727197 NO 23369 27197
Data Type Point
Summer Storms Yes
Winter Storms Yes
Cv (Summer) 0.750
Cv (Winter) 0.840
Shortest Storm (mins) 15
Longest Storm (mins) 10080
Climate Change % +39
Time Area Diagram
Total Area (ha) 0.021
Time
From:
(mins)
To:
Area
(ha)
0 4 0.021

Page 109

Gondolin Land & Water Ltd Page 2
Craig Burn
Surface Water Soakaway
Date 27/02/2026 Designed by DB
File CRAIGBURN HOUSE SOAKAWA... Checked by ZR
Innovyze Source Control 2020.1.3
Model Details
©1982-2020 Innovyze
Storage is Online Cover Level (m) 1.200
Trench Soakaway Structure
Infiltration Coefficient Base (m/hr) 0.00500 Trench Width (m) 4.5
Infiltration Coefficient Side (m/hr) 0.00500 Trench Length (m) 13.0
Safety Factor 1.5 Slope (1:X) 100.0
Porosity 0.35 Cap Volume Depth (m) 0.000
Invert Level (m) 0.000 Cap Infiltration Depth (m) 0.000
26 Leith Walk
Edinburgh
EH6 5AA

Page 110

Gondolin Land & Water Ltd Page 3
Craig Burn
Surface Water Soakaway
Date 27/02/2026 Designed by DB
File CRAIGBURN HOUSE SOAKAWA... Checked by ZR
Innovyze Source Control 2020.1.3
Summary of Results for 2 year Return Period
©1982-2020 Innovyze
Half Drain Time : 546 minutes.
Storm
Event
Max
Level
(m)
Max
Depth
(m)
Max
Infiltration
(l/s)
Max
Volume
(m³)
Status
15 min Summer 0.114 0.114 0.0 1.0 O K
30 min Summer 0.132 0.132 0.1 1.4 O K
60 min Summer 0.150 0.150 0.1 1.7 O K
120 min Summer 0.177 0.177 0.1 2.3 O K
180 min Summer 0.192 0.192 0.1 2.6 O K
240 min Summer 0.201 0.201 0.1 2.8 O K
360 min Summer 0.212 0.212 0.1 3.0 O K
480 min Summer 0.218 0.218 0.1 3.1 O K
600 min Summer 0.222 0.222 0.1 3.2 O K
720 min Summer 0.225 0.225 0.1 3.3 O K
960 min Summer 0.227 0.227 0.1 3.3 O K
1440 min Summer 0.226 0.226 0.1 3.3 O K
2160 min Summer 0.219 0.219 0.1 3.1 O K
2880 min Summer 0.209 0.209 0.1 3.0 O K
4320 min Summer 0.189 0.189 0.1 2.5 O K
5760 min Summer 0.171 0.171 0.1 2.2 O K
7200 min Summer 0.156 0.156 0.1 1.9 O K
8640 min Summer 0.144 0.144 0.1 1.6 O K
10080 min Summer 0.135 0.135 0.1 1.4 O K
15 min Winter 0.121 0.121 0.1 1.2 O K
Storm
Event
Rain
(mm/hr)
Flooded
Volume
(m³)
Time-Peak
(mins)
15 min Summer 26.978 0.0 19
30 min Summer 18.221 0.0 33
60 min Summer 11.984 0.0 62
120 min Summer 8.217 0.0 122
180 min Summer 6.454 0.0 182
240 min Summer 5.402 0.0 240
360 min Summer 4.174 0.0 360
480 min Summer 3.466 0.0 418
600 min Summer 2.996 0.0 484
720 min Summer 2.658 0.0 552
960 min Summer 2.199 0.0 684
1440 min Summer 1.672 0.0 966
2160 min Summer 1.265 0.0 1384
2880 min Summer 1.036 0.0 1788
4320 min Summer 0.780 0.0 2556
5760 min Summer 0.639 0.0 3336
7200 min Summer 0.550 0.0 4040
8640 min Summer 0.488 0.0 4752
10080 min Summer 0.442 0.0 5448
15 min Winter 26.978 0.0 18
26 Leith Walk
Edinburgh
EH6 5AA

Page 111

Gondolin Land & Water Ltd Page 4
Craig Burn
Surface Water Soakaway
Date 27/02/2026 Designed by DB
File CRAIGBURN HOUSE SOAKAWA... Checked by ZR
Innovyze Source Control 2020.1.3
Summary of Results for 2 year Return Period
©1982-2020 Innovyze
Storm
Event
Max
Level
(m)
Max
Depth
(m)
Max
Infiltration
(l/s)
Max
Volume
(m³)
Status
30 min Winter 0.140 0.140 0.1 1.5 O K
60 min Winter 0.161 0.161 0.1 2.0 O K
120 min Winter 0.192 0.192 0.1 2.6 O K
180 min Winter 0.209 0.209 0.1 3.0 O K
240 min Winter 0.221 0.221 0.1 3.2 O K
360 min Winter 0.235 0.235 0.1 3.5 O K
480 min Winter 0.242 0.242 0.1 3.6 O K
600 min Winter 0.246 0.246 0.1 3.7 O K
720 min Winter 0.248 0.248 0.1 3.8 O K
960 min Winter 0.251 0.251 0.1 3.8 O K
1440 min Winter 0.248 0.248 0.1 3.7 O K
2160 min Winter 0.234 0.234 0.1 3.5 O K
2880 min Winter 0.217 0.217 0.1 3.1 O K
4320 min Winter 0.184 0.184 0.1 2.4 O K
5760 min Winter 0.157 0.157 0.1 1.9 O K
7200 min Winter 0.136 0.136 0.1 1.5 O K
8640 min Winter 0.124 0.124 0.1 1.2 O K
10080 min Winter 0.116 0.116 0.1 1.1 O K
Storm
Event
Rain
(mm/hr)
Flooded
Volume
(m³)
Time-Peak
(mins)
30 min Winter 18.221 0.0 33
60 min Winter 11.984 0.0 62
120 min Winter 8.217 0.0 120
180 min Winter 6.454 0.0 178
240 min Winter 5.402 0.0 236
360 min Winter 4.174 0.0 348
480 min Winter 3.466 0.0 456
600 min Winter 2.996 0.0 558
720 min Winter 2.658 0.0 588
960 min Winter 2.199 0.0 740
1440 min Winter 1.672 0.0 1052
2160 min Winter 1.265 0.0 1496
2880 min Winter 1.036 0.0 1932
4320 min Winter 0.780 0.0 2724
5760 min Winter 0.639 0.0 3464
7200 min Winter 0.550 0.0 4112
8640 min Winter 0.488 0.0 4760
10080 min Winter 0.442 0.0 5544
26 Leith Walk
Edinburgh
EH6 5AA

Page 112

Gondolin Land & Water Ltd Page 5
Craig Burn
Surface Water Soakaway
Date 27/02/2026 Designed by DB
File CRAIGBURN HOUSE SOAKAWA... Checked by ZR
Innovyze Source Control 2020.1.3
Summary of Results for 10 year Return Period
©1982-2020 Innovyze
Half Drain Time : 818 minutes.
Storm
Event
Max
Level
(m)
Max
Depth
(m)
Max
Infiltration
(l/s)
Max
Volume
(m³)
Status
15 min Summer 0.157 0.157 0.1 1.9 O K
30 min Summer 0.189 0.189 0.1 2.5 O K
60 min Summer 0.225 0.225 0.1 3.3 O K
120 min Summer 0.257 0.257 0.1 3.9 O K
180 min Summer 0.276 0.276 0.1 4.3 O K
240 min Summer 0.287 0.287 0.1 4.6 O K
360 min Summer 0.301 0.301 0.1 4.8 O K
480 min Summer 0.309 0.309 0.1 5.0 O K
600 min Summer 0.312 0.312 0.1 5.1 O K
720 min Summer 0.314 0.314 0.1 5.1 O K
960 min Summer 0.317 0.317 0.1 5.2 O K
1440 min Summer 0.315 0.315 0.1 5.1 O K
2160 min Summer 0.307 0.307 0.1 5.0 O K
2880 min Summer 0.296 0.296 0.1 4.7 O K
4320 min Summer 0.272 0.272 0.1 4.2 O K
5760 min Summer 0.249 0.249 0.1 3.8 O K
7200 min Summer 0.228 0.228 0.1 3.3 O K
8640 min Summer 0.210 0.210 0.1 3.0 O K
10080 min Summer 0.194 0.194 0.1 2.6 O K
15 min Winter 0.168 0.168 0.1 2.1 O K
Storm
Event
Rain
(mm/hr)
Flooded
Volume
(m³)
Time-Peak
(mins)
15 min Summer 48.768 0.0 19
30 min Summer 33.179 0.0 34
60 min Summer 21.775 0.0 64
120 min Summer 13.547 0.0 122
180 min Summer 10.188 0.0 182
240 min Summer 8.303 0.0 242
360 min Summer 6.208 0.0 362
480 min Summer 5.054 0.0 480
600 min Summer 4.311 0.0 594
720 min Summer 3.787 0.0 642
960 min Summer 3.089 0.0 762
1440 min Summer 2.315 0.0 1026
2160 min Summer 1.733 0.0 1448
2880 min Summer 1.411 0.0 1848
4320 min Summer 1.053 0.0 2680
5760 min Summer 0.857 0.0 3464
7200 min Summer 0.733 0.0 4248
8640 min Summer 0.646 0.0 4936
10080 min Summer 0.582 0.0 5656
15 min Winter 48.768 0.0 19
26 Leith Walk
Edinburgh
EH6 5AA

Page 113

Gondolin Land & Water Ltd Page 6
Craig Burn
Surface Water Soakaway
Date 27/02/2026 Designed by DB
File CRAIGBURN HOUSE SOAKAWA... Checked by ZR
Innovyze Source Control 2020.1.3
Summary of Results for 10 year Return Period
©1982-2020 Innovyze
Storm
Event
Max
Level
(m)
Max
Depth
(m)
Max
Infiltration
(l/s)
Max
Volume
(m³)
Status
30 min Winter 0.204 0.204 0.1 2.8 O K
60 min Winter 0.245 0.245 0.1 3.7 O K
120 min Winter 0.282 0.282 0.1 4.4 O K
180 min Winter 0.303 0.303 0.1 4.9 O K
240 min Winter 0.318 0.318 0.1 5.2 O K
360 min Winter 0.335 0.335 0.1 5.5 O K
480 min Winter 0.346 0.346 0.1 5.7 O K
600 min Winter 0.352 0.352 0.1 5.9 O K
720 min Winter 0.355 0.355 0.1 5.9 O K
960 min Winter 0.356 0.356 0.1 6.0 O K
1440 min Winter 0.353 0.353 0.1 5.9 O K
2160 min Winter 0.340 0.340 0.1 5.6 O K
2880 min Winter 0.321 0.321 0.1 5.3 O K
4320 min Winter 0.282 0.282 0.1 4.4 O K
5760 min Winter 0.245 0.245 0.1 3.7 O K
7200 min Winter 0.213 0.213 0.1 3.0 O K
8640 min Winter 0.185 0.185 0.1 2.5 O K
10080 min Winter 0.162 0.162 0.1 2.0 O K
Storm
Event
Rain
(mm/hr)
Flooded
Volume
(m³)
Time-Peak
(mins)
30 min Winter 33.179 0.0 33
60 min Winter 21.775 0.0 62
120 min Winter 13.547 0.0 120
180 min Winter 10.188 0.0 180
240 min Winter 8.303 0.0 238
360 min Winter 6.208 0.0 352
480 min Winter 5.054 0.0 466
600 min Winter 4.311 0.0 578
720 min Winter 3.787 0.0 686
960 min Winter 3.089 0.0 886
1440 min Winter 2.315 0.0 1110
2160 min Winter 1.733 0.0 1576
2880 min Winter 1.411 0.0 2020
4320 min Winter 1.053 0.0 2892
5760 min Winter 0.857 0.0 3688
7200 min Winter 0.733 0.0 4464
8640 min Winter 0.646 0.0 5184
10080 min Winter 0.582 0.0 5856
26 Leith Walk
Edinburgh
EH6 5AA

Page 114

Gondolin Land & Water Ltd Page 7
Craig Burn
Surface Water Soakaway
Date 27/02/2026 Designed by DB
File CRAIGBURN HOUSE SOAKAWA... Checked by ZR
Innovyze Source Control 2020.1.3
Summary of Results for 30 year Return Period
©1982-2020 Innovyze
Half Drain Time : 1041 minutes.
Storm
Event
Max
Level
(m)
Max
Depth
(m)
Max
Infiltration
(l/s)
Max
Volume
(m³)
Status
15 min Summer 0.190 0.190 0.1 2.6 O K
30 min Summer 0.235 0.235 0.1 3.5 O K
60 min Summer 0.285 0.285 0.1 4.5 O K
120 min Summer 0.322 0.322 0.1 5.3 O K
180 min Summer 0.343 0.343 0.1 5.7 O K
240 min Summer 0.357 0.357 0.1 6.0 O K
360 min Summer 0.375 0.375 0.1 6.3 O K
480 min Summer 0.385 0.385 0.1 6.5 O K
600 min Summer 0.391 0.391 0.1 6.7 O K
720 min Summer 0.394 0.394 0.1 6.7 O K
960 min Summer 0.396 0.396 0.1 6.8 O K
1440 min Summer 0.396 0.396 0.1 6.8 O K
2160 min Summer 0.390 0.390 0.1 6.7 O K
2880 min Summer 0.380 0.380 0.1 6.5 O K
4320 min Summer 0.355 0.355 0.1 5.9 O K
5760 min Summer 0.329 0.329 0.1 5.4 O K
7200 min Summer 0.305 0.305 0.1 4.9 O K
8640 min Summer 0.282 0.282 0.1 4.4 O K
10080 min Summer 0.261 0.261 0.1 4.0 O K
15 min Winter 0.205 0.205 0.1 2.9 O K
Storm
Event
Rain
(mm/hr)
Flooded
Volume
(m³)
Time-Peak
(mins)
15 min Summer 65.914 0.0 19
30 min Summer 45.323 0.0 34
60 min Summer 29.748 0.0 64
120 min Summer 17.832 0.0 124
180 min Summer 13.184 0.0 182
240 min Summer 10.635 0.0 242
360 min Summer 7.856 0.0 362
480 min Summer 6.354 0.0 482
600 min Summer 5.397 0.0 600
720 min Summer 4.727 0.0 720
960 min Summer 3.840 0.0 836
1440 min Summer 2.869 0.0 1096
2160 min Summer 2.147 0.0 1496
2880 min Summer 1.746 0.0 1908
4320 min Summer 1.301 0.0 2728
5760 min Summer 1.056 0.0 3568
7200 min Summer 0.898 0.0 4328
8640 min Summer 0.788 0.0 5104
10080 min Summer 0.706 0.0 5856
15 min Winter 65.914 0.0 19
26 Leith Walk
Edinburgh
EH6 5AA

Page 115

Gondolin Land & Water Ltd Page 8
Craig Burn
Surface Water Soakaway
Date 27/02/2026 Designed by DB
File CRAIGBURN HOUSE SOAKAWA... Checked by ZR
Innovyze Source Control 2020.1.3
Summary of Results for 30 year Return Period
©1982-2020 Innovyze
Storm
Event
Max
Level
(m)
Max
Depth
(m)
Max
Infiltration
(l/s)
Max
Volume
(m³)
Status
30 min Winter 0.256 0.256 0.1 3.9 O K
60 min Winter 0.313 0.313 0.1 5.1 O K
120 min Winter 0.355 0.355 0.1 5.9 O K
180 min Winter 0.379 0.379 0.1 6.4 O K
240 min Winter 0.396 0.396 0.1 6.8 O K
360 min Winter 0.417 0.417 0.1 7.2 O K
480 min Winter 0.431 0.431 0.1 7.5 O K
600 min Winter 0.440 0.440 0.1 7.7 O K
720 min Winter 0.446 0.446 0.1 7.8 O K
960 min Winter 0.450 0.450 0.1 7.9 O K
1440 min Winter 0.448 0.448 0.1 7.8 O K
2160 min Winter 0.439 0.439 0.1 7.7 O K
2880 min Winter 0.422 0.422 0.1 7.3 O K
4320 min Winter 0.381 0.381 0.1 6.5 O K
5760 min Winter 0.340 0.340 0.1 5.6 O K
7200 min Winter 0.301 0.301 0.1 4.8 O K
8640 min Winter 0.266 0.266 0.1 4.1 O K
10080 min Winter 0.235 0.235 0.1 3.5 O K
Storm
Event
Rain
(mm/hr)
Flooded
Volume
(m³)
Time-Peak
(mins)
30 min Winter 45.323 0.0 33
60 min Winter 29.748 0.0 62
120 min Winter 17.832 0.0 122
180 min Winter 13.184 0.0 180
240 min Winter 10.635 0.0 238
360 min Winter 7.856 0.0 354
480 min Winter 6.354 0.0 470
600 min Winter 5.397 0.0 584
720 min Winter 4.727 0.0 694
960 min Winter 3.840 0.0 912
1440 min Winter 2.869 0.0 1156
2160 min Winter 2.147 0.0 1620
2880 min Winter 1.746 0.0 2076
4320 min Winter 1.301 0.0 2980
5760 min Winter 1.056 0.0 3808
7200 min Winter 0.898 0.0 4616
8640 min Winter 0.788 0.0 5440
10080 min Winter 0.706 0.0 6152
26 Leith Walk
Edinburgh
EH6 5AA

Page 116

Gondolin Land & Water Ltd Page 9
Craig Burn
Surface Water Soakaway
Date 27/02/2026 Designed by DB
File CRAIGBURN HOUSE SOAKAWA... Checked by ZR
Innovyze Source Control 2020.1.3
Summary of Results for 100 year Return Period
©1982-2020 Innovyze
Half Drain Time : 1319 minutes.
Storm
Event
Max
Level
(m)
Max
Depth
(m)
Max
Infiltration
(l/s)
Max
Volume
(m³)
Status
15 min Summer 0.228 0.228 0.1 3.3 O K
30 min Summer 0.290 0.290 0.1 4.6 O K
60 min Summer 0.357 0.357 0.1 6.0 O K
120 min Summer 0.399 0.399 0.1 6.8 O K
180 min Summer 0.424 0.424 0.1 7.3 O K
240 min Summer 0.441 0.441 0.1 7.7 O K
360 min Summer 0.465 0.465 0.1 8.2 O K
480 min Summer 0.480 0.480 0.1 8.5 O K
600 min Summer 0.490 0.490 0.1 8.7 O K
720 min Summer 0.497 0.497 0.1 8.8 O K
960 min Summer 0.503 0.503 0.1 9.0 O K
1440 min Summer 0.507 0.507 0.1 9.1 O K
2160 min Summer 0.504 0.504 0.1 9.0 O K
2880 min Summer 0.495 0.495 0.1 8.8 O K
4320 min Summer 0.468 0.468 0.1 8.3 O K
5760 min Summer 0.440 0.440 0.1 7.7 O K
7200 min Summer 0.411 0.411 0.1 7.1 O K
8640 min Summer 0.384 0.384 0.1 6.5 O K
10080 min Summer 0.359 0.359 0.1 6.0 O K
15 min Winter 0.248 0.248 0.1 3.7 O K
Storm
Event
Rain
(mm/hr)
Flooded
Volume
(m³)
Time-Peak
(mins)
15 min Summer 86.001 0.0 19
30 min Summer 59.721 0.0 34
60 min Summer 39.152 0.0 64
120 min Summer 22.906 0.0 124
180 min Summer 16.754 0.0 182
240 min Summer 13.437 0.0 242
360 min Summer 9.877 0.0 362
480 min Summer 7.967 0.0 482
600 min Summer 6.756 0.0 602
720 min Summer 5.913 0.0 720
960 min Summer 4.805 0.0 952
1440 min Summer 3.593 0.0 1182
2160 min Summer 2.688 0.0 1560
2880 min Summer 2.185 0.0 1988
4320 min Summer 1.621 0.0 2812
5760 min Summer 1.310 0.0 3632
7200 min Summer 1.110 0.0 4464
8640 min Summer 0.970 0.0 5192
10080 min Summer 0.865 0.0 6048
15 min Winter 86.001 0.0 19
26 Leith Walk
Edinburgh
EH6 5AA

Page 117

Gondolin Land & Water Ltd Page 10
Craig Burn
Surface Water Soakaway
Date 27/02/2026 Designed by DB
File CRAIGBURN HOUSE SOAKAWA... Checked by ZR
Innovyze Source Control 2020.1.3
Summary of Results for 100 year Return Period
©1982-2020 Innovyze
Storm
Event
Max
Level
(m)
Max
Depth
(m)
Max
Infiltration
(l/s)
Max
Volume
(m³)
Status
30 min Winter 0.318 0.318 0.1 5.2 O K
60 min Winter 0.393 0.393 0.1 6.7 O K
120 min Winter 0.441 0.441 0.1 7.7 O K
180 min Winter 0.470 0.470 0.1 8.3 O K
240 min Winter 0.491 0.491 0.1 8.7 O K
360 min Winter 0.519 0.519 0.1 9.3 O K
480 min Winter 0.538 0.538 0.1 9.7 O K
600 min Winter 0.551 0.551 0.1 10.0 O K
720 min Winter 0.561 0.561 0.1 10.2 O K
960 min Winter 0.574 0.574 0.1 10.4 O K
1440 min Winter 0.579 0.579 0.1 10.5 O K
2160 min Winter 0.573 0.573 0.1 10.4 O K
2880 min Winter 0.559 0.559 0.1 10.1 O K
4320 min Winter 0.517 0.517 0.1 9.3 O K
5760 min Winter 0.472 0.472 0.1 8.3 O K
7200 min Winter 0.427 0.427 0.1 7.4 O K
8640 min Winter 0.385 0.385 0.1 6.6 O K
10080 min Winter 0.346 0.346 0.1 5.8 O K
Storm
Event
Rain
(mm/hr)
Flooded
Volume
(m³)
Time-Peak
(mins)
30 min Winter 59.721 0.0 33
60 min Winter 39.152 0.0 64
120 min Winter 22.906 0.0 122
180 min Winter 16.754 0.0 180
240 min Winter 13.437 0.0 240
360 min Winter 9.877 0.0 356
480 min Winter 7.967 0.0 472
600 min Winter 6.756 0.0 586
720 min Winter 5.913 0.0 700
960 min Winter 4.805 0.0 924
1440 min Winter 3.593 0.0 1342
2160 min Winter 2.688 0.0 1668
2880 min Winter 2.185 0.0 2136
4320 min Winter 1.621 0.0 3068
5760 min Winter 1.310 0.0 3928
7200 min Winter 1.110 0.0 4760
8640 min Winter 0.970 0.0 5616
10080 min Winter 0.865 0.0 6360
26 Leith Walk
Edinburgh
EH6 5AA

Page 118

Gondolin Land & Water Ltd Page 11
Craig Burn
Surface Water Soakaway
Date 27/02/2026 Designed by DB
File CRAIGBURN HOUSE SOAKAWA... Checked by ZR
Innovyze Source Control 2020.1.3
Summary of Results for 200 year Return Period
©1982-2020 Innovyze
Half Drain Time : 1500 minutes.
Storm
Event
Max
Level
(m)
Max
Depth
(m)
Max
Infiltration
(l/s)
Max
Volume
(m³)
Status
15 min Summer 0.252 0.252 0.1 3.8 O K
30 min Summer 0.325 0.325 0.1 5.3 O K
60 min Summer 0.402 0.402 0.1 6.9 O K
120 min Summer 0.448 0.448 0.1 7.8 O K
180 min Summer 0.477 0.477 0.1 8.4 O K
240 min Summer 0.497 0.497 0.1 8.8 O K
360 min Summer 0.524 0.524 0.1 9.4 O K
480 min Summer 0.543 0.543 0.1 9.8 O K
600 min Summer 0.557 0.557 0.1 10.1 O K
720 min Summer 0.566 0.566 0.1 10.3 O K
960 min Summer 0.577 0.577 0.1 10.5 O K
1440 min Summer 0.583 0.583 0.1 10.6 O K
2160 min Summer 0.580 0.580 0.1 10.6 O K
2880 min Summer 0.571 0.571 0.1 10.4 O K
4320 min Summer 0.542 0.542 0.1 9.8 O K
5760 min Summer 0.511 0.511 0.1 9.1 O K
7200 min Summer 0.480 0.480 0.1 8.5 O K
8640 min Summer 0.451 0.451 0.1 7.9 O K
10080 min Summer 0.422 0.422 0.1 7.3 O K
15 min Winter 0.275 0.275 0.1 4.3 O K
Storm
Event
Rain
(mm/hr)
Flooded
Volume
(m³)
Time-Peak
(mins)
15 min Summer 98.442 0.0 19
30 min Summer 68.744 0.0 34
60 min Summer 44.965 0.0 64
120 min Summer 26.145 0.0 124
180 min Summer 19.077 0.0 182
240 min Summer 15.278 0.0 242
360 min Summer 11.211 0.0 362
480 min Summer 9.042 0.0 482
600 min Summer 7.669 0.0 602
720 min Summer 6.713 0.0 722
960 min Summer 5.452 0.0 960
1440 min Summer 4.072 0.0 1238
2160 min Summer 3.038 0.0 1620
2880 min Summer 2.462 0.0 2020
4320 min Summer 1.821 0.0 2852
5760 min Summer 1.467 0.0 3688
7200 min Summer 1.240 0.0 4472
8640 min Summer 1.081 0.0 5280
10080 min Summer 0.963 0.0 6056
15 min Winter 98.442 0.0 19
26 Leith Walk
Edinburgh
EH6 5AA

Page 119

Gondolin Land & Water Ltd Page 12
Craig Burn
Surface Water Soakaway
Date 27/02/2026 Designed by DB
File CRAIGBURN HOUSE SOAKAWA... Checked by ZR
Innovyze Source Control 2020.1.3
Summary of Results for 200 year Return Period
©1982-2020 Innovyze
Storm
Event
Max
Level
(m)
Max
Depth
(m)
Max
Infiltration
(l/s)
Max
Volume
(m³)
Status
30 min Winter 0.356 0.356 0.1 6.0 O K
60 min Winter 0.443 0.443 0.1 7.7 O K
120 min Winter 0.496 0.496 0.1 8.8 O K
180 min Winter 0.529 0.529 0.1 9.5 O K
240 min Winter 0.553 0.553 0.1 10.0 O K
360 min Winter 0.586 0.586 0.1 10.7 O K
480 min Winter 0.609 0.609 0.1 11.1 O K
600 min Winter 0.627 0.627 0.1 11.5 O K
720 min Winter 0.640 0.640 0.1 11.8 O K
960 min Winter 0.657 0.657 0.1 12.1 O K
1440 min Winter 0.668 0.668 0.1 12.4 O K
2160 min Winter 0.662 0.662 0.1 12.2 O K
2880 min Winter 0.649 0.649 0.1 11.9 O K
4320 min Winter 0.605 0.605 0.1 11.1 O K
5760 min Winter 0.557 0.557 0.1 10.1 O K
7200 min Winter 0.509 0.509 0.1 9.1 O K
8640 min Winter 0.463 0.463 0.1 8.2 O K
10080 min Winter 0.420 0.420 0.1 7.3 O K
Storm
Event
Rain
(mm/hr)
Flooded
Volume
(m³)
Time-Peak
(mins)
30 min Winter 68.744 0.0 33
60 min Winter 44.965 0.0 64
120 min Winter 26.145 0.0 122
180 min Winter 19.077 0.0 180
240 min Winter 15.278 0.0 240
360 min Winter 11.211 0.0 356
480 min Winter 9.042 0.0 472
600 min Winter 7.669 0.0 588
720 min Winter 6.713 0.0 702
960 min Winter 5.452 0.0 926
1440 min Winter 4.072 0.0 1356
2160 min Winter 3.038 0.0 1712
2880 min Winter 2.462 0.0 2164
4320 min Winter 1.821 0.0 3108
5760 min Winter 1.467 0.0 3984
7200 min Winter 1.240 0.0 4832
8640 min Winter 1.081 0.0 5704
10080 min Winter 0.963 0.0 6464
26 Leith Walk
Edinburgh
EH6 5AA

Page 120

Gondolin Land & Water Ltd Page 13
Craig Burn
Surface Water Soakaway
Date 27/02/2026 Designed by DB
File CRAIGBURN HOUSE SOAKAWA... Checked by ZR
Innovyze Source Control 2020.1.3
Summary of Results for 200 year Return Period (+39%)
©1982-2020 Innovyze
Half Drain Time : 2046 minutes.
Storm
Event
Max
Level
(m)
Max
Depth
(m)
Max
Infiltration
(l/s)
Max
Volume
(m³)
Status
15 min Summer 0.326 0.326 0.1 5.3 O K
30 min Summer 0.428 0.428 0.1 7.4 O K
60 min Summer 0.536 0.536 0.1 9.6 O K
120 min Summer 0.604 0.604 0.1 11.0 O K
180 min Summer 0.646 0.646 0.1 11.9 O K
240 min Summer 0.677 0.677 0.1 12.5 O K
360 min Summer 0.721 0.721 0.1 13.4 O K
480 min Summer 0.753 0.753 0.1 14.1 O K
600 min Summer 0.777 0.777 0.1 14.6 O K
720 min Summer 0.796 0.796 0.1 15.0 O K
960 min Summer 0.822 0.822 0.1 15.5 O K
1440 min Summer 0.845 0.845 0.1 16.0 O K
2160 min Summer 0.849 0.849 0.1 16.1 O K
2880 min Summer 0.843 0.843 0.1 15.9 O K
4320 min Summer 0.816 0.816 0.1 15.4 O K
5760 min Summer 0.783 0.783 0.1 14.7 O K
7200 min Summer 0.750 0.750 0.1 14.0 O K
8640 min Summer 0.718 0.718 0.1 13.4 O K
10080 min Summer 0.686 0.686 0.1 12.7 O K
15 min Winter 0.357 0.357 0.1 6.0 O K
Storm
Event
Rain
(mm/hr)
Flooded
Volume
(m³)
Time-Peak
(mins)
15 min Summer 136.834 0.0 19
30 min Summer 95.554 0.0 34
60 min Summer 62.502 0.0 64
120 min Summer 36.341 0.0 124
180 min Summer 26.516 0.0 184
240 min Summer 21.237 0.0 244
360 min Summer 15.583 0.0 362
480 min Summer 12.568 0.0 482
600 min Summer 10.660 0.0 602
720 min Summer 9.331 0.0 722
960 min Summer 7.578 0.0 962
1440 min Summer 5.660 0.0 1430
2160 min Summer 4.223 0.0 1776
2880 min Summer 3.422 0.0 2160
4320 min Summer 2.531 0.0 2980
5760 min Summer 2.039 0.0 3808
7200 min Summer 1.723 0.0 4616
8640 min Summer 1.502 0.0 5448
10080 min Summer 1.338 0.0 6256
15 min Winter 136.834 0.0 19
26 Leith Walk
Edinburgh
EH6 5AA

Page 121

Gondolin Land & Water Ltd Page 14
Craig Burn
Surface Water Soakaway
Date 27/02/2026 Designed by DB
File CRAIGBURN HOUSE SOAKAWA... Checked by ZR
Innovyze Source Control 2020.1.3
Summary of Results for 200 year Return Period (+39%)
©1982-2020 Innovyze
Storm
Event
Max
Level
(m)
Max
Depth
(m)
Max
Infiltration
(l/s)
Max
Volume
(m³)
Status
30 min Winter 0.472 0.472 0.1 8.3 O K
60 min Winter 0.593 0.593 0.1 10.8 O K
120 min Winter 0.671 0.671 0.1 12.4 O K
180 min Winter 0.719 0.719 0.1 13.4 O K
240 min Winter 0.755 0.755 0.1 14.1 O K
360 min Winter 0.806 0.806 0.1 15.2 O K
480 min Winter 0.845 0.845 0.1 16.0 O K
600 min Winter 0.875 0.875 0.1 16.6 O K
720 min Winter 0.898 0.898 0.1 17.1 O K
960 min Winter 0.933 0.933 0.1 17.8 O K
1440 min Winter 0.968 0.968 0.1 18.5 O K
2160 min Winter 0.977 0.977 0.1 18.7 O K
2880 min Winter 0.967 0.967 0.1 18.5 O K
4320 min Winter 0.930 0.930 0.1 17.7 O K
5760 min Winter 0.880 0.880 0.1 16.7 O K
7200 min Winter 0.829 0.829 0.1 15.6 O K
8640 min Winter 0.778 0.778 0.1 14.6 O K
10080 min Winter 0.729 0.729 0.1 13.6 O K
Storm
Event
Rain
(mm/hr)
Flooded
Volume
(m³)
Time-Peak
(mins)
30 min Winter 95.554 0.0 34
60 min Winter 62.502 0.0 64
120 min Winter 36.341 0.0 122
180 min Winter 26.516 0.0 180
240 min Winter 21.237 0.0 240
360 min Winter 15.583 0.0 358
480 min Winter 12.568 0.0 474
600 min Winter 10.660 0.0 590
720 min Winter 9.331 0.0 708
960 min Winter 7.578 0.0 934
1440 min Winter 5.660 0.0 1384
2160 min Winter 4.223 0.0 2012
2880 min Winter 3.422 0.0 2276
4320 min Winter 2.531 0.0 3200
5760 min Winter 2.039 0.0 4144
7200 min Winter 1.723 0.0 5040
8640 min Winter 1.502 0.0 5880
10080 min Winter 1.338 0.0 6760
26 Leith Walk
Edinburgh
EH6 5AA

Page 122

Gondolin Land & Water Ltd Page 15
Craig Burn
Surface Water Soakaway
Date 27/02/2026 Designed by DB
File CRAIGBURN HOUSE SOAKAWA... Checked by ZR
Innovyze Source Control 2020.1.3
Summary of Results for 1000 year Return Period
©1982-2020 Innovyze
Half Drain Time : 1920 minutes.
Storm
Event
Max
Level
(m)
Max
Depth
(m)
Max
Infiltration
(l/s)
Max
Volume
(m³)
Status
15 min Summer 0.315 0.315 0.1 5.1 O K
30 min Summer 0.417 0.417 0.1 7.2 O K
60 min Summer 0.521 0.521 0.1 9.3 O K
120 min Summer 0.582 0.582 0.1 10.6 O K
180 min Summer 0.621 0.621 0.1 11.4 O K
240 min Summer 0.649 0.649 0.1 12.0 O K
360 min Summer 0.690 0.690 0.1 12.8 O K
480 min Summer 0.718 0.718 0.1 13.4 O K
600 min Summer 0.738 0.738 0.1 13.8 O K
720 min Summer 0.753 0.753 0.1 14.1 O K
960 min Summer 0.772 0.772 0.1 14.5 O K
1440 min Summer 0.781 0.781 0.1 14.7 O K
2160 min Summer 0.774 0.774 0.1 14.5 O K
2880 min Summer 0.760 0.760 0.1 14.2 O K
4320 min Summer 0.723 0.723 0.1 13.5 O K
5760 min Summer 0.684 0.684 0.1 12.7 O K
7200 min Summer 0.648 0.648 0.1 11.9 O K
8640 min Summer 0.613 0.613 0.1 11.2 O K
10080 min Summer 0.581 0.581 0.1 10.6 O K
15 min Winter 0.345 0.345 0.1 5.7 O K
Storm
Event
Rain
(mm/hr)
Flooded
Volume
(m³)
Time-Peak
(mins)
15 min Summer 131.355 0.0 19
30 min Summer 92.677 0.0 34
60 min Summer 60.600 0.0 64
120 min Summer 34.950 0.0 124
180 min Summer 25.431 0.0 184
240 min Summer 20.338 0.0 242
360 min Summer 14.890 0.0 362
480 min Summer 11.978 0.0 482
600 min Summer 10.132 0.0 602
720 min Summer 8.845 0.0 722
960 min Summer 7.143 0.0 960
1440 min Summer 5.282 0.0 1398
2160 min Summer 3.899 0.0 1732
2880 min Summer 3.135 0.0 2128
4320 min Summer 2.293 0.0 2940
5760 min Summer 1.835 0.0 3752
7200 min Summer 1.544 0.0 4608
8640 min Summer 1.341 0.0 5440
10080 min Summer 1.192 0.0 6248
15 min Winter 131.355 0.0 19
26 Leith Walk
Edinburgh
EH6 5AA

Page 123

Gondolin Land & Water Ltd Page 16
Craig Burn
Surface Water Soakaway
Date 27/02/2026 Designed by DB
File CRAIGBURN HOUSE SOAKAWA... Checked by ZR
Innovyze Source Control 2020.1.3
Summary of Results for 1000 year Return Period
©1982-2020 Innovyze
Storm
Event
Max
Level
(m)
Max
Depth
(m)
Max
Infiltration
(l/s)
Max
Volume
(m³)
Status
30 min Winter 0.459 0.459 0.1 8.1 O K
60 min Winter 0.577 0.577 0.1 10.5 O K
120 min Winter 0.647 0.647 0.1 11.9 O K
180 min Winter 0.691 0.691 0.1 12.8 O K
240 min Winter 0.724 0.724 0.1 13.5 O K
360 min Winter 0.771 0.771 0.1 14.5 O K
480 min Winter 0.805 0.805 0.1 15.2 O K
600 min Winter 0.831 0.831 0.1 15.7 O K
720 min Winter 0.850 0.850 0.1 16.1 O K
960 min Winter 0.876 0.876 0.1 16.6 O K
1440 min Winter 0.897 0.897 0.1 17.0 O K
2160 min Winter 0.889 0.889 0.1 16.9 O K
2880 min Winter 0.871 0.871 0.1 16.5 O K
4320 min Winter 0.819 0.819 0.1 15.4 O K
5760 min Winter 0.763 0.763 0.1 14.3 O K
7200 min Winter 0.707 0.707 0.1 13.2 O K
8640 min Winter 0.655 0.655 0.1 12.1 O K
10080 min Winter 0.606 0.606 0.1 11.1 O K
Storm
Event
Rain
(mm/hr)
Flooded
Volume
(m³)
Time-Peak
(mins)
30 min Winter 92.677 0.0 34
60 min Winter 60.600 0.0 64
120 min Winter 34.950 0.0 122
180 min Winter 25.431 0.0 180
240 min Winter 20.338 0.0 240
360 min Winter 14.890 0.0 358
480 min Winter 11.978 0.0 474
600 min Winter 10.132 0.0 590
720 min Winter 8.845 0.0 706
960 min Winter 7.143 0.0 934
1440 min Winter 5.282 0.0 1382
2160 min Winter 3.899 0.0 1988
2880 min Winter 3.135 0.0 2248
4320 min Winter 2.293 0.0 3160
5760 min Winter 1.835 0.0 4096
7200 min Winter 1.544 0.0 4976
8640 min Winter 1.341 0.0 5800
10080 min Winter 1.192 0.0 6664
26 Leith Walk
Edinburgh
EH6 5AA

Page 124

Appendix D
Site Photography

Page 125

Entrance junction 
Existing access track

Page 126

Proposed dwelling house plot looking southwest 
Proposed dwelling house plot looking west

Page 127

Proposed dwelling house plot looking northwest 
Neighbouring plot to west

Page 128

Appendix E
Wastewater Loading Calculations

Page 129

Flow (l) BOD (g) NH3 (g) Qty Flow (l) BOD (g) NH3 (g)
Domestic Dwellings - Standard Residential. 150 60 8 5 750 300 40 Single domestic dwelling. Assumed less than or equal to 3 bedrooms. 
750 300 40
5 5
0.750
0.009
0.02 Average Flow rate multiplied by 2.5 as per Scottish Water advice
Notes:
LOADING CALCULATIONS
1. From British Water Flows and Loads Code of Practice 4
2. All units in person / activity / day unless specified otherwise
Grand Totals
Population Equivalent
Item(1),(2) Per Activity Per Person Totals Notes
Maximum Daily Flow (m3/d)
Average Flow Rate (l/s)
Peak flow rate

Page 130

DRAWINGS

Page 131

Contains OS data © Crown copyright and database rights [2025]Contains OS data © Crown copyright and database rights [2025]
DRAWING NUMBER: REV:
REV BYBY CHK
SCALE:
DESCRIPTION
DATE:
DIA-001 Site Location Plan_00.dwg
DRAWING TITLE:
PROJECT:
DATE
CLIENT:
GONDOLIN LAND & WATER LTD
26 Leith Walk
Edinburgh
EH6 5AA
Registered Company No. SC706920
LEGEND
N
© Crown copyright and database rights [2025] Ordnance Survey 0100031673 Crown copyright and database rights [2025] Ordnance Survey 0100031673
© This drawing and its content are the copyright of Gondolin Land & Water Ltd and may not be edited or reproduced except by prior written consent.  Gondolin accepts no liability for any amendments made by other persons.© This drawing and its content are the copyright of Gondolin Land & Water Ltd and may not be edited or reproduced except by prior written consent.  Gondolin accepts no liability for any amendments made by other persons.© This drawing and its content are the copyright of Gondolin Land & Water Ltd and may not be edited or reproduced except by prior written consent.  Gondolin accepts no liability for any amendments made by other persons.© This drawing and its content are the copyright of Gondolin Land & Water Ltd and may not be edited or reproduced except by prior written consent.  Gondolin accepts no liability for any amendments made by other persons.
DRAWING STATUS:
0000 03/26 INITIAL ISSUE DBDB ZRZR
STUART HESLOP
CRAIGBURN HOUSE
SITE LOCATION PLAN
1:1,250 @ A3 MARCH 2026
DIA-001 0000
FOR PLANNING
0 12.5 2525 37.5 50m 7575 100 125
Metres 1:1,250
PLANNING BOUNDARY

Page 132

Contains OS data © Crown copyright and database rights [2025]
DRAWING NUMBER: REV:
REV BYBY CHK
SCALE:
DESCRIPTION
DATE:
DIA-002 Hydrological Overview_00.dwg
DRAWING TITLE:
PROJECT:
DATE
NOTES
LEGEND
CLIENT:
GONDOLIN LAND & WATER LTD
Registered Company No. SC706920
N
© Crown copyright and database rights [2025] Ordnance Survey 0100031673
© This drawing and its content are the copyright of Gondolin Land & Water Ltd and may not be edited or reproduced except by prior written consent.  Gondolin accepts no liability for any amendments made by other persons.© This drawing and its content are the copyright of Gondolin Land & Water Ltd and may not be edited or reproduced except by prior written consent.  Gondolin accepts no liability for any amendments made by other persons.© This drawing and its content are the copyright of Gondolin Land & Water Ltd and may not be edited or reproduced except by prior written consent.  Gondolin accepts no liability for any amendments made by other persons.
DRAWING STATUS:
0000 03/26 INITIAL ISSUE DBDB ZRZR
STUART HESLOP
CRAIGBURN HOUSE
HYDROLOGICAL OVERVIEW
1:400 @ A2 MARCH 2026
DIA-002  0000
FOR PLANNING
0 20m 4040
Metres 1:400
8
1.1. TOPOGRAPHY DERIVED FROM LIDAR DATA
SOURCED FROM THE SCOTTISH REMOTE
SENSING PORTAL.
2.2. ALIGNMENT OF SCOTTISH WATER MAINS
APPROXIMATE AND BASED ON ASSET PLAN
SOURCED FROM THE SCOTTISH WATER GIS
EXTRANET DATED 19/12/25.
EXISTING MAJOR CONTOURS
(1.0m INTERVAL)
EXISTING MINOR CONTOURS
(0.25m INTERVAL)
OVERLAND FLOWPATH
PLANNING BOUNDARY
CRAIG BURN
RUNOFF FOLLOWS NATURAL
TOPOGRAPHY TO THE SOUTH
EXISTING SCOTTISH WATER MAIN
SCOTTISH WATER 250mm DUCTILE
IRON DISTRIBUTION MAIN
SCOTTISH WATER 200mm DUCTILE
IRON DISTRIBUTION MAIN
4.5m ACCESS DISTANCE FROM
SCOTTISH WATER MAINS
8.25m STAND-OFF DISTANCE FROM
SCOTTISH WATER MAINS

Page 133

Craigburn HouseCraigburn House
RWP
RWP
RWP
RWP
Contains OS data © Crown copyright and database rights [2025]
DRAWING NUMBER: REV:
REV BYBY CHK
SCALE:
DESCRIPTION
DATE:
DIA-003 Proposed Drainage Layout_00.dwg
DRAWING TITLE:
PROJECT:
DATE
NOTES
LEGEND
CLIENT:
GONDOLIN LAND & WATER LTD
Registered Company No. SC706920
N
© Crown copyright and database rights [2025] Ordnance Survey 0100031673
© This drawing and its content are the copyright of Gondolin Land & Water Ltd and may not be edited or reproduced except by prior written consent.  Gondolin accepts no liability for any amendments made by other persons.© This drawing and its content are the copyright of Gondolin Land & Water Ltd and may not be edited or reproduced except by prior written consent.  Gondolin accepts no liability for any amendments made by other persons.© This drawing and its content are the copyright of Gondolin Land & Water Ltd and may not be edited or reproduced except by prior written consent.  Gondolin accepts no liability for any amendments made by other persons.
DRAWING STATUS:
0000 03/26 INITIAL ISSUE DBDB ZRZR
STUART HESLOP
CRAIGBURN HOUSE
PROPOSED DRAINAGE LAYOUT
1:200 @ A2 MARCH 2026
DIA-003  0000
FOR PLANNING
0 10m 2020
Metres 1:200
4
1.1. TOPOGRAPHY DERIVED FROM LIDAR DATA
SOURCED FROM THE SCOTTISH REMOTE
SENSING PORTAL.
2.2. ALIGNMENT OF SCOTTISH WATER MAINS
APPROXIMATE AND BASED ON ASSET PLAN
SOURCED FROM THE SCOTTISH WATER GIS
EXTRANET DATED 19/12/25.
3.3. SOAKAWAY SIZING APPROXIMATE AND BASED
ON TYPICAL VALUES FOR THE SUPERFICIAL
DEPOSITS INDICATED. INFILTRATION TESTING
REQUIRED AT LATER PROJECT STAGE TO
CONFIRM.
4.4. DRAWING TO BE READ IN CONJUNCTION WITH
ALL OTHER SCHEME DRAWINGS.
5.5. DESIGN SHOULD BE CONSIDERED PROVISIONAL
OUTLINE DETAIL TO BE REFINED AT DETAILED
DESIGN STAGE.
SCOTTISH WATER 250mm DUCTILE
IRON DISTRIBUTION MAIN
SCOTTISH WATER 200mm DUCTILE
IRON DISTRIBUTION MAIN
PLANNING BOUNDARY
4.5m ACCESS DISTANCE FROM
SCOTTISH WATER MAINS
8.25m STAND-OFF DISTANCE FROM
SCOTTISH WATER MAINS
INDICATIVE SURFACE
WATER SOAKAWAY
INDICATIVE WASTEWATER
SOAKAWAY
INDICATIVE WASTEWATER
TREATMENT PLANT
CRAIG BURN
PROPOSED WASTEWATER SOAKAWAY
POSITIONED DOWNSLOPE OF PROPERTY
AND AWAY FROM WATERCOURSE
SURFACE WATER AND WASTEWATER
SOAKAWAYS MAINTAIN A 5m BUFFER
FROM THE PROPOSED PROPERTY
PROPOSED SURFACE WATER
SOAKAWAY OUTLINE DETAILS:
· SURFACE AREA = 58.5 m2
· STORAGE DEPTH = 1.2 m
· POROSITY = 0.35
· STORAGE VOLUME =  24.6m³
PROPOSED FOUL WATER PIPEWORK
PROPOSED FOUL WATER DRAINAGE
MANHOLE / INSPECTION CHAMBER
INDICATIVE RAINWATER
DOWNPIPES
PROPOSED CONVENTIONAL
DRAINAGE
PROPOSED WASTEWATER SOAKAWAY
WITH MINIMUM AREA OF 70m2
PROPOSED SECONDARY WASTEWATER TREATMENT
SYSTEM (KLARGESTER BIODISC OR SIMILAR)
RAINFALL TO BE COLLECTED FROM ROOF
AREAS VIA STANDARD RAINWATER PIPEWORK PROPOSED MANHOLE /
INSPECTION CHAMBER
RWP

Page 134

1350
1200
INTERNAL DIAMETER
OF MANHOLE (MM)
1500
1800
375 to 450
LESS THAN 375
500 to 700
750 to 900
DIAMETER OF LARGEST
PIPE IN MANHOLE (MM)
INTERNAL DIAMETER OF CONCRETE MANHOLES
MIN ROCKER PIPE LENGTH
NOMINAL DIAMETER(mm)
over 750
150 to 600
over 600 to 750
600
1000
1250
L(mm)
NOTE:  RIGID PIPES BUILT INTO MANHOLES SHALL HAVERIGID PIPES BUILT INTO MANHOLES SHALL HAVEA FLEXIBLE JOINT AS CLOSE AS  FEASIBLE TO
THE EXTERNAL FACE OF THE STRUCTURE ANDTHE LENGTH OF THE NEXT ROCKER PIPE SHALL
BE AS IN THE TABLE BELOW
PIPE DIAMETER +900>900
600
450
DIAMETER OF INSPECTION
CHAMBER (MM)
750
160 to 300
LESS THAN 160
300 to 450
DIAMETER OF LARGEST
PIPE IN MANHOLE (MM)
INTERNAL DIAMETER OF INSPECTION CHAMBERSINTERNAL DIAMETER OF INSPECTION CHAMBERS
PROVIDE FULL DEPTH FLEXIBLE JOINTS @ 5000MMPROVIDE FULL DEPTH FLEXIBLE JOINTS @ 5000MM
CENTRES MAX. USING 18MM THK. COMPRESSIBLECENTRES MAX. USING 18MM THK. COMPRESSIBLE
FIBREBOARD, PRE-CUT TO PIPE DIA.
CLASS 'Z' PIPE BEDDING &
BACKFILLING DETAIL
PIPES WHERE COVER TO CROWN IS LESS THAN 1200MMPIPES WHERE COVER TO CROWN IS LESS THAN 1200MM
UNDER ROADS AND FOOTPATHS
CLASS 'S' PIPE BEDDING &
BACKFILLING DETAIL
PIPES WHERE COVER TO CROWN IS GREATER THANPIPES WHERE COVER TO CROWN IS GREATER THAN
1200MM UNDER ROADS AND FOOTPATHS
CONCRETE SURROUND,
GEN 3 20MM MAX.
AGGREGATE SIZE.
APPROVED GRANULAR
FILL FREE FROM STONES
LARGER THAN 40MM.
GRANULAR HAUNCH &
BEDDING SIZED IN
ACCORDANCE WITH
BS EN 12620:2002
APPROVED GRANULAR
FILL FREE FROM STONES
LARGER THAN 40MM.
D
D
NOTE: TYPE 'B' NOT TO BE USED UNDER CARRIAGEWAYS AND PARKINGNOTE: TYPE 'B' NOT TO BE USED UNDER CARRIAGEWAYS AND PARKING
AREAS ON CLAY SITES INDICATED ON SECTIONS. IT IS TO BE SUBSTITUTEDAREAS ON CLAY SITES INDICATED ON SECTIONS. IT IS TO BE SUBSTITUTED
BY DOT TYPE 2.
FILL TYPE 'B' WILL CONSIST OF READILY COMPACTED MATERIAL FREE FROMFILL TYPE 'B' WILL CONSIST OF READILY COMPACTED MATERIAL FREE FROM
TREE ROOTS, VEGETABLE MATTER, BUILDING MATERIAL, FROZEN SOIL,TREE ROOTS, VEGETABLE MATTER, BUILDING MATERIAL, FROZEN SOIL,
CLAY LUMPS RETAINED ON A 75MM SIEVE AND STONES LARGER THANCLAY LUMPS RETAINED ON A 75MM SIEVE AND STONES LARGER THAN
PERMITTED FOR TYPE 'A' MATERIAL
TYPE  'B'  FILL  MATERIAL
 
 
 
% PASSING BY MASS
B.S. 410 SIEVE SIZES (mm)
GRANULAR  BEDDING  TYPE  'A'GRANULAR  BEDDING  TYPE  'A'
TRENCH BEDDING AND FILL MATERIALSTRENCH BEDDING AND FILL MATERIALS
USE FOR
NOMINAL PIPE
(DIA.)
TYPE
<300A10 -
6363
--
37.5 2020
0.25
5
85.1100
10101414
2.36
2.36
450W 600
150100D
850700 1050
TRENCH   DIMENSIONS
300225 375
APPROPRIATE SLEEVE CONNECTION
FROM RWP TO UNDERGROUND
PIPEWORK TO BE PROVIDED
GROUND LEVEL
RWP RODDING EYE/ACCESS
POINT TO BE PROVIDED AT
0.6m ABOVE GROUND LEVEL
RWP CONNECTION DETAIL
TO NEAREST
MANHOLE /
INSPECTION
CHAMBER
150MM THICK MASS CONC. (GRADE
GEN 3) BED AND SURROUND TO
COVER FRAME AND CHAMBER.
12MM THICK COMPRESSIBLE FIBRE
BOARD BETWEEN CHAMBER AND
CONCRETE TO ACT AS BOND BREAK.
150MM THICK MASS CONC. (GRADE
GEN 3) SURROUND TO ALL CHAMBERS.
450 I.D POLYPROPYLENE CIRCULAR
INSPECTION CHAMBER (LARGER
DIAMETER ALSO SUITABLE AT
DEVELOPER'S DISCRETION)
TYPICAL INSPECTION CHAMBER DETAILTYPICAL INSPECTION CHAMBER DETAIL
1:25
REFER TO PIPE
BEDDING DETAILS.
COVER AND FRAME TO B.S. EN 124:1994
(LOCKABLE COVER IN PAVEMENTS) REFER
TO SCHEDULE FOR CLASS AND SIZE.
ALL INSITU CONCRETE TO BE GEN 3 WITH
SULPHATE RESISTING CEMENT OR EQUIVALENTSULPHATE RESISTING CEMENT OR EQUIVALENT
COMBINATION GROUPS 2A, 3, GIVEN IN BS
8500-2: 2002 UNLESS DIRECTED OTHERWISE.8500-2: 2002 UNLESS DIRECTED OTHERWISE.
POLYPROPYLENE CIRCULAR
INSPECTION CHAMBER
(450mm - 750mm ID)
TYPICAL INSPECTION CHAMBER DETAILTYPICAL INSPECTION CHAMBER DETAIL
(GRAVEL SURROUND - NON-TRAFFICKED AREAS)(GRAVEL SURROUND - NON-TRAFFICKED AREAS)
NTS
REFER TO PIPE
BEDDING DETAILS.
C250 COVER TO B.S. EN 124:1994
EXCEPT WHERE OTHERWISE STATED
(LOCKABLE COVER IN PAVEMENTS)
300mm THICK
SURROUND OF
SINGLE SIZE PEA
GRAVEL
0.30m
50mm SAND
BLINDING LAYER
0.10m
0.30m
CONNECTION
SEWER
CROSS-SECTIONAL
VIEW OF SEWER
A
0°0°
ACCEPTABLE
RANGE
BACKFILL
REINFORCED
COMPRESSIBLE
GRANULAR
PIPE
300mm MINIMUM BEARING
COMPRESSIBLE FILLER
PIPE
100 100
CONCRETE PIPE SURROUNDSPIGOT AND 
SLEEVE JOINT CONCRETE PIPE SURROUND
PIPE
100 100 COMPRESSIBLE FILLER
NTS
ON ORIGINAL GROUND
ALTERNATIVE PIPE PROTECTION DETAILALTERNATIVE PIPE PROTECTION DETAIL
MATERIAL
CONCRETE SLAB
SURROUND
JOINTS FOR CONCRETE ENCASEDJOINTS FOR CONCRETE ENCASED
PIPES
SOCKET JOINT
PIPE
BRANCH SEWER CONNECTIONBRANCH SEWER CONNECTION
DETAIL
NTS
NTS
1m PIPE SPACING
SECTION THROUGH PROPOSED SURFACE WATER SOAKAWAYSECTION THROUGH PROPOSED SURFACE WATER SOAKAWAYSECTION THROUGH PROPOSED SURFACE WATER SOAKAWAY
1:25
GRANULAR FILTER MEDIUM
FILTER MEDIUM WRAPPED IN GEOTEXTILE
MINIMUM 200mm TOPSOIL
ABOVE SOAKAWAY
MIN. 1.0m UNSATURATED
ZONE BELOW INVERT OF
WASTEWATER SOAKAWAY
0.2m
INLET FROM SURFACE WATER /
WASTEWATER PIPE NETWORK
100mm Ø PERFORATED PIPES TO DISTRIBUTE
FLOWS THROUGHOUT TRENCH. INVERT OF
PIPE TO BE 100mm ABOVE TRENCH BASE AND
TO HAVE LONGITUDINAL FALL TO MATCH
EXISTING GROUND LEVEL (MIN 0.5%)
CLEAN WASHED 16-32mm GRAVEL
FLOW DISTRIBUTION
MANHOLE
FILTER MEDIUM TO BE WRAPPED IN
GEOTEXTILE SEPARATOR (TERRAM
1000 OR SIMILAR APPROVED)
INDICATIVE EXISTING
GROUND PROFILE MIN. 300mm THICKNESS
REINSTATED TOPSOIL
EXISTING SUPERFICIALS
EXISTING TOPSOIL
Contains OS data © Crown copyright and database rights [2024]Contains OS data © Crown copyright and database rights [2024]
DRAWING NUMBER: REV:
REV BYBY CHK
SCALE:
DESCRIPTION
DATE:
DIA-004 Typical Drainage Details_00.dwg
DRAWING TITLE:
PROJECT:
DATE
NOTES
CLIENT:
GONDOLIN LAND & WATER LTD
26 Leith Walk
Edinburgh
EH6 5AA
Registered Company No. SC706920
N
© Crown copyright and database rights [2024] Ordnance Survey 0100031673 Crown copyright and database rights [2024] Ordnance Survey 0100031673
© This drawing and its content are the copyright of Gondolin Land & Water Ltd and may not be edited or reproduced except by prior written consent.  Gondolin accepts no liability for any amendments made by other persons.© This drawing and its content are the copyright of Gondolin Land & Water Ltd and may not be edited or reproduced except by prior written consent.  Gondolin accepts no liability for any amendments made by other persons.© This drawing and its content are the copyright of Gondolin Land & Water Ltd and may not be edited or reproduced except by prior written consent.  Gondolin accepts no liability for any amendments made by other persons.© This drawing and its content are the copyright of Gondolin Land & Water Ltd and may not be edited or reproduced except by prior written consent.  Gondolin accepts no liability for any amendments made by other persons.
DRAWING STATUS:
0000 03/26 INITIAL ISSUE DBDB ZRZR
STUART HESLOP
CRAIGBURN HOUSE
TYPICAL DRAINAGE DETAILS
AS SHOWN @ A1 MARCH 2026
DIA-004 0000
FOR PLANNING
1.1. ALL DRAINAGE TO BE INSTALLED IN
ACCORDANCE WITH SEWERS FOR SCOTLAND
/ SCOTTISH TECHNICAL HANDBOOK WHERE
REQUIRED.
2.2. DESIGN SHOULD BE CONSIDERED OUTLINE
ENGINEERING DESIGN. FINAL LEVELS,
ALIGNMENTS AND GRADIENTS TO BE
CONFIRMED AT DETAILED DESIGN STAGE.

Page 135

Civil Engineering and Environmental Solutions 
Gondolin Land and Water Ltd is a small environmental
and engineering consultancy business based in Scotland
with coverage throughout the UK. 
Office Address:
26 Leith Walk
Edinburgh
EH6 5AA 
Registered Company No.
SC706920 
Sectors:
Onshore Renewables & Storage | Infrastructure | Mining and Minerals
Property & Urban Regeneration | Retail, Industrial & Manufacturing | 
Waste Management

Page 136

No embedded text on this page.