Page 1

Argyll and Bute Council
Development & Economic Growth   
Delegated Planning Application Report and Report of Handling as required by
Schedule 2 of the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013 relative to applications for Planning Permission or
Planning Permission in Principle 
Reference No: 21/02141/PP
Planning Hierarchy: Local
Applicant: Ardfin Estate Ltd
Proposal: Erection of buildings to facilitate residential staff accommodation
with associated access and parking arrangements
Site Address:  Land North East Of Coastguard Station Craighouse Isle Of Jura
Argyll And Bute.  
DECISION ROUTE 
Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
 Erection of staff residential blocks (class 7) and bin store to create seven
double and 26 single rooms (33 units in total).
 Associated access and parking arrangements
 Associated landscaping
 Formation of remote footpath
 Erection of air source heat pump and housing 
(ii) Other specified operations
 Connection to Public Water Supply
 Connection to Public Sewer
 Offsite road Improvements to provide road widening, an adopted
footpath, and adopted street lighting on the A846, 
(B) RECOMMENDATION:             
It is recommended that planning permission be granted subject to the conditions and
reasons attached. However, in light of the significant body of third party representation
members are however advised that it would be appropriate to hold a discretionary pre-
determination hearing prior to reaching a determination. 
(C) CONSULTATIONS:   
Jura Community Council replied 08.02.2022. A number of points made which will
be addressed in section F and precised below:
 Prefer residential Class 9 in the interests of long term sustainable residents; 
 Precedent being set for this scale and density of development and its
proximity to new builds;

Page 2

 The development should have a separate access;
 A lack of footway and lighting will exacerbate the existing issues;
 Issues regarding stretching existing services for example road capacity and
safety. Ferry services. Shop storage, water and sewage and other utilities,
healthcare and emergency services;
 Any development should be in H3031 as designated in the LDP;
 Request an extension to the deadline to enable further consultation. 
Environmental Health replied 25.01.2022. Working hours information will be
attached as a condition. Advice provide on licencing of HMOs which would not be
applicable to the proposed Class 7 use.
Health And Safety General replied 14.01.2022. The site does not lie within the zone
of a major hazard.  
Flood Risk Assessor replied 04.02.2022. No objection with condition attached. 
Scottish Water replied 17.01.2022. No waste water infrastructure though
connection to Craighouse public water supply is possible. 
Area Roads replied 03.02.2022, 06.09.22 and 14.09.22.
Area Roads liaised with the applicants agents to reach an agreed solution which
require conditional acceptance. No objection with conditions attached.  
Nature Scot replied 24.03.2022 that there will be no likely significant effect on the
qualifying interests of Craighouse Ravine, Jura SSSI. A woodland condition to be
applied. 
(D) HISTORY:              
None of the applicant’s recent proposals are for this site. 
21/01565/PREAPP was supplied outlining the main policies and consultations and                
an appraisal of a proposal within the NSA and close to the nature sites with regard 
to current and developing policy. 
(E) PUBLICITY:   
Regulation 20 advert expired 17.02.2022
Neighbour notification expired 08.02.2022 
(F) REPRESENTATIONS:   
(i) Representations received from: 
Objections from 24 individuals and the Isle of Jura Community Council: 
Gwen Boardman 4 Burnside Craighouse Isle Of Jura PA60 7XP 07.02.2022
Deborah Bryce Knockrome Isle Of Jura PA60 7XZ 08.02.2022
Pi Davidson Arturas Knockrome Isle Of Jura PA60 7XZ 11.02.2022
Mrs Alison Fleming 1 Burnside Craighouse Isle Of Jura 09.02.2022
K Gow Ardcraig Isle Fo Jura PA60 7XR 09.02.2022 
Sheena Gow Ardcraig, Craighouse Isle Of Jura PA60 7XR 07.02.2022
Ms Elizabeth Harrington 5 Croft Park Craighouse Isle Of Jura 11.02.2022
Mrs Harriet Horne Ruantallian Tarbert Isle Of Jura Isle Of Jura 08.02.2022
Natalia Jejer Carraig Craighouse Isle Of Jura PA60 7XG 18.02.2022
Christine McCourt London N4 3AB 08.02.2022 
Dr Lesley Morrison Tigh-an-fhigheadair Keils Jura PA60 7XG 08.02.2022
Louise Muir Gealach Lan Ballard Craighouse Isle Of Jura 01.02.2022

Page 3

John G F Perring Knockrome Old School Isle Of Jura PA60 7XZ 08.02.2022
Mr Jonathan Pye Ardfarnal Craighouse Isle Of Jura 08.02.2022
Mrs Roxanna Robb Bishop's Well Craighouse Isle Of 07.02.2022 
Mr Sam Robb Bishops Well Kiels Jura PA60 7XP 07.02.2022
Craig Rozga Goirtean Dubh Croft Knockrome Isle Of Jura PA60 7XZ 08.02.2022
Denise Rozga Goirtean Dubh Croft Knockrome Isle Of Jura PA60 7XZ 08.02.2022
Ms Moira Stirling 10 Burnside Craighouse Isle Of Jura 13.02.2022
Mr Andrew Welch 1 Ardfin Cottages Craighouse Isle Of Jura 
Mrs Louise Welch 1 Ardfin Cottages Craighouse Isle Of Jura 07.02.2022 
Iain Macdonald No Address Provided 04.02.2022
Yvonne Macdonald No Address Provided 07.02.2022
Gordon Muir No Address Provided 01.02.2022 
The summary of objection are detailed below. 
Reasons for representations received and the responses where relevant.   
Proposal is contrary to LDP STRAT 1 as the 20% increase in population this
represents is not sustainable on an island with a low population and limited
infrastructure. 
Due to the increase in population this should have been a major application.   
Comment- This is not a householder application within the terms of the Scottish
Planning systems Hierarchy of Development and does not reach the criteria of a
major application. LDP STRAT 1 (a and c) are intended to support local 
communities and maximize the use of local infrastructure and services creating
opportunities for further improvement. An increase in population is not deemed to
be contrary to policy. 
The proposal is contrary to LDP 5, 8, 9, 10 and 11 and their supplementary
guidance especially regarding affordable housing and business location and
transport provision. 
Comment- The policy provisions noted will be addressed in the relevant sections of
Appendix A. 
The proposal is an overdevelopment of the site. 
The density proposed in the cul de sac is inconsistent with that of the population
nodes on the island. 
Comment- The site represents a habitable ground area of around 1.5 hectares and
the proposal is for 33 units holding a maximum population of 40 gives a maximum
density of around 27 people per hectare. This is a common level within settlements
not just in Argyll and Bute but nation wide.      
The proposal made before neighbouring properties are occupied raises the
question of the legality of the Neighbour Notification . 
A consultation with the communities should have been made. 
The timing of the submission may have been to minimise representations over the
Xmas period and so avoid reasonable scrutiny.   
Comment- It is regrettable that there are no householders to notify on the
developing plots. The timing of notification and publicity is relative to the time of

Page 4

submission/validation, it is noted that the Council currently accepts late
representations and as such there has been no prejudice to the ability of interested
parties to participate in the planning process arising from the Christmas holiday
period. In this case officers intend to recommend to the council’s Planning
Committee that this application is taken forward to a Hearing. The decision whether
to hold a Hearing will be the solely that of the committee.   
No other sites are shown as being examined from the accompanying supporting
statements. 
In a climate emergency, this facility should be located closer to the intended
workplace to minimise new journeys. 
The estate own unused buildings on the island which should have been addressed
in the design/access statement outlining why these have not been considered. 
Comment - Under policy LDP DM1 (b) for Key Rural Settlements encouragement is
given for sustainable development on appropriate sites. Sites within the settlement
boundary are deemed to be appropriate for most forms of accommodations
proposals.    
Does not support exiting communities and maximise the use of existing
infrastructure and services. 
Does not look to strengthen communities or link with existing services and
organisations but may have an adverse impact on them. Community council, local
development trust, school, NHS, etc. do not appear to have been consulted pre
app. 
An influx of younger residents may require specialist medical provision not currently
available on the island. 
Are police services adequate to deal with the alteration to the island’s
demographics. 
The sustainable employment case has not been made with no evidence to show
any future permanence of the roles or those who will fill them. 
The island relies on permanent residents volunteering to provide services. The
itinerant nature of the proposals workforce may mean stretching services without a
commitment to volunteer their own services. 
Comment- These concerns have all been noted and in most cases are not material
to the planning process. There increase of the working population may be looked
on as a drain or stretching of services, or the benefits of an active workforce with
disposable income which may support existing services.   
This proposal may hamper the development of social housing within the settlement
boundary in future unless the design is adaptable for repurposing. 
As per Community Action Plan new housing should be affordable and for
permanent residents. 
The Class 7 use is not appropriate with the CAP. 
There is no downstream housing provision for any workers to settle on the island. 
Temporary residents are unlikely to invest in the island and its sustainable future. 
Comment- Although a useful guidance document the Community Action Plan
(CAP) is not a material consideration with regard to this proposal. The update in
2022 includes proposed actions regarding:
 Road conditions/passing places
 Transport services in general 
 Health and care services including dentistry

Page 5

There is a further site within the settlement being brought forward for consideration
for affordable housing. Policy regarding Class 7 use is tested against policy in
Appendix A Section A. 
The roads infrastructure is currently inadequate as agreed by the councils roads
department. 
The proposal intrinsically encourages motor vehicle use between Craighouse and
the Ardfin estate. 
The road is inadequate for current levels of use and requires upgrading as part of
this application. 
The level of car parking provision is too high and will result in traffic flows at
unusual times with their attendant noise and light pollution.
The footways, cycling and wheeling provision at the site and to and from
Craighouse and the estate are inadequate for this level of development. 
All hours vehicle movements represent a danger to new neighbours their children
and pets. 
Comment- The council’s roads department have conditioned their approval on
formation of a  footpath from the shared entrance to 1 Woodside and to include
streetlighting. The parking, including accessible is in line with government
guidelines. The estate has indicated that a mini bus will be provided and the shift
pattern is unlikely to create a mini rush hour. It is noted in the report that loss of
amenity due to vehicle noise/light has been considered.   
The proposal does not maximise sustainable design with regards to waste and
minimising the carbon footprint. 
The water supply is inadequate to cater for this proposed level of occupation and
indeed the island has already experienced recent drought at current population
levels.   
Comment- Scottish Water has no objection to this planning application; however,
the applicant should be aware that this does not confirm that the proposed
development can currently be serviced and the correct procedures must be
followed to gain approval for connection. 
The potential for noise and loss of amenity to the new housing with what is a
university halls like development must be addressed. Similarly the limited public
social buildings in Craighouse. 
Comment- These aspects are examined in Appendix A. 
The proposal should have been made for allocated housing sites or on existing
vacant and derelict land. 
PDA (H3031) is for local housing not for seasonal business use. 
The plan shows a staged development which means that initial accommodation can
be directed to existing empty houses. 
Comment- The policy constraints are examined in Appendix A Section A and it has
been found that although alternative sites may exist, this proposal is supported by
policy with regard to development within the settlement. 
The adjoining SSSI may be compromised by the consequences of this use of the
land. 
The landscape character and biodiversity of the area will be irreparably damaged.

Page 6

The proposal will impact views from and over the NSA and Wild Land. 
There is potential of pollution of the water course. 
The proposed use and the design on the main approach to Craighouse is
detrimental to the setting and character of the village and the island in general.   
Comment – These aspects will be examined with regard to policy in Appendix A. 
The economic benefit to the proposer should not outweigh the detrimental impact to
the communities. 
Comment- Noted 
Does not maximise the opportunity for local community benefit. 
Comment– Noted 
Current infrastructure challenges on the island are not addressed with regard to
exacerbating the situation by this proposal. 
Comment- Noted 
The ferry capacity may not be sufficient for the increased traffic this will create. 
Comment- Noted. 
There is an ongoing issue with hidden homelessness on the island which this
proposal may exacerbate.
Comment= Noted  
A section 75 order for the estate to contribute to the viability of the island bus
service should be considered. 
Comment- Noted 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) EIAR: No 
(ii) An appropriate assessment under the Conservation (Natural
Habitats) Regulations 1994:   
No  
(iii) A design or design/access statement:   
Descriptions of the brief, the design and landscaping, roads, parking 
and access, refuse and recycling, sustainability and drainage. 
Yes 
(iv) A report on the impact of the proposed development eg. Retail
impact, transport impact, noise impact, flood risk, drainage
impact etc:                         
Sustainability Statement covering  Energy and CO2 Emissions, 
Water, Pollution, Health and Wellbeing and Drainage. 
Yes 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   No

Page 7

(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  No 
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
‘Argyll and Bute Local Development Plan’ Adopted March 2015 
LDP STRAT 1 – Sustainable Development 
LDP DM 1 – Development within the Development Management Zones
LDP 3 – Supporting the Protection, Conservation and Enhancement of our
Environments
LDP 5 – Supporting The Sustainable Growth Of Our Economy 
LDP 8 – Supporting the Strength of our Communities 
LDP 9 – Development Setting, Layout and Design
LDP 10 - Maximising our Resources and Reducing our Consumption
LDP 11 – Improving Our Connectivity and Infrastructure 
‘Supplementary Guidance to the Argyll and Bute Local Plan 2015’ (Adopted
March 2016) 
Natural Environment
SG LDP ENV 1 - Development Impact on Habitats, Species and our Biodiversity  
SG LDP ENV 2 - Development Impact on European Sites
SG LDP ENV 4 - Development Impact on Sites of Special Scientific Interest (SSSIs)
and National Nature Reserves
SG LDP ENV 6 - Development Impact on Trees / Woodland 
SG LDP ENV 7 - Water Quality and the Environment             
Landscape and Design            
SG LDP ENV 12 - Development Impact on National Scenic Areas (NSAs)            
SG LDP ENV 14 – Landscape 
Support For Business and Industry General            
SG LDP BUS 1 – Business and Industry Proposals in Existing Settlements and                
Identified Business and Industry Areas            
SG LDP BUS 5 - Economically Fragile Areas                        
Sustainable Siting and Design            
SG LDP Sustainable – Sustainable Siting and Design Principles               
Bad Neighbour Development 
SG LDP BAD 1 – Bad Neighbour Development 
Resources and Consumption
SG LDP SERV 5(b) - Provision of Waste Storage and Collection Facilities within
New Development 
Planning Gain
SG LDP PG 1 – Planning Gain

Page 8

Transport Including Core Paths)  
SG LDP TRAN 3 - Special Needs Access Provision 
SG LDP TRAN 4 - New and Existing, Public Roads and Private Access Regimes 
SG LDP TRAN 6 - Vehicle Parking Provision 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
 Scottish Planning Policy
 Argyll and Bute Economic Development Action Plan
 Consultee comments
 Isle of Jura Community Council and Community Action Plan 
 Representations
 Landscape Capacity Study For Housing Island of Jura (Nov 2007) 
Argyll and Bute proposed Local Development Plan 2 (November 2019) – The 
unchallenged policies and proposals within pLDP2 may be afforded   
significant material weighting in the determination of planning applications at                       
this time as the settled and unopposed view of the Council. Elements of the 
pLDP2 which have been identified as being subject to unresolved objections 
still require to be subject of Examination by a Scottish Government appointed   
Reporter and cannot be afforded significant material weighting at this time.                       
The provisions of pLDP2 that may be afforded significant weighting in the   
determination of this application are listed below: 
 Policy 35 – Design of New and Existing, Public Roads and Private Access                         
Regimes
 Policy 36 – New Private Accesses
 Policy 37 – Development Utilising an Existing Private Access or Existing Private                                                                         
Road
 Policy 38 – Construction Standards for Public Roads
 Policy 39 – Construction Standards for Private Access
 Policy 40 – Vehicle Parking Provision
 Policy 63 – Waste Related Development and Waste Management
 Policy 78 – Woodland Removal 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  No 
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  No 
(M) Has a sustainability check list been submitted:  No 
(N) Does the Council have an interest in the site:  No 
(O) Requirement for a hearing:  Yes 
The proposal has been subject to concerns raised by Jura Community Council and
objections raised by 24 individuals; it is further noted that the timing of submission

Page 9

has preclude direct neighbour notification of adjacent properties within a West
Highland Housing Association scheme that will be directly impacted by the proposed
development as it will share the means of vehicular access. As these properties had
not yet been completed and occupied at the time the application was validated it
was not possible for the planning authority to directly neighbour notify occupants
and invite their direct participation in the planning process although the wider
population will have been informed of the proposal through advertisement in the
local press. 
The letters of objection received from 24 individuals raise issues with the suitability
of the site for the scale and nature of development proposed, the potential impact
that the development may have upon the residential amenity of the new housing
development being constructed, and its implications for road safety. Whilst it is the
consideration of officers that the proposal is consistent with the LDP and that the
various matters of concerns can be satisfactorily addressed by mitigation measures
it is noted that officers recommendation to grant planning permission sits against a
not-insubstantial volume of public opposition (when considered within the context of
the overall population of Jura), and in the absence of any formally stated public
support for the proposal from third parties. 
In light of significant local opposition to the development it is considered that a pre-
determination hearing would in this instance add value to the decision making
process. 
(P) Assessment and summary of determining issues and material considerations 
The application seeks detailed planning permission for the erection of staff
accommodation that would be occupied by employees of Ardfin Estate. The proposal
would provide accommodation that is suitable for longer term occupation by
employees currently living in temporary accommodation on the island and in doing
so support employment and growth of tourism related employment on the island. 
The proposed staff accommodation will fall under Use Class 7. The proposed
development is comprised of four distinct blocks arranged in a loose courtyard and
sited to the north-east of a newly built affordable housing development with which it
will share access to the A846 public road. 
The proposal is considered to be a ‘large’ scale commercial development and
exceeds the scale of development normally supported by policies LDP DM 1, LDP
5SG LDP BUS within the key settlement of Craighouse. It has however been
identified that the proposal is intended to support tourism employment which is key
to the island and identified as a key employment area for Argyll and Bute in the
Council’s Economic Development Action Plan. The proposal accordingly may be
supported under the provisions of SG LDP BUS 5 which affords flexibility to scales
of development within areas identified as being ‘economically fragile’ in the LDP. 
The proposal has been subject to an expression of concern from Jura Community
Council and objection from 24 individual third parties. 
No objections to the proposal from consultees in relation to its access or
infrastructure requirements and it is also observed that the proposals include for
provisions that will provide road improvements including streetlighting and a footway
that will benefit the wider public.

Page 10

The site is located within the Jura National Scenic Area and in proximity to the
Craighouse Ravines SSSI, however Nature Scotland have not raised objection in
either respect. 
(Q) Is the proposal consistent with the Development Plan: Yes 
(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Granted: 
The proposal is considered to be consistent with the relevant provisions of the
Development Plan, and there are no other material considerations of sufficient
significance to indicate that it would be appropriate to withhold planning permission
having regard to s25 of the Act. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
n/a 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
No   
Author of Report:  Derek Wilson Date: 31.08.2022 
Reviewing Officer: Peter Bain Date: 14.09.2022 
Fergus Murray
Head of Development and Economic Growth

Page 11

CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 21/02141/PP 
1. The development shall be implemented in accordance with the details specified on the
application form dated 18.10.2021, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan  DS148:(LP) 001
Rev D 
15.06.2022
Proposed Site Plan  DS148:(SP) 002
Rev D 
15.06.2022
Supplementary Location
Plan (1:10,000) 
DS148:(LP) 002
Rev A 
16.12.2021
Site Section as
Proposed 
DS148:(PA) 004  11.10.2021
Elevations and Sections
as Proposed - Block 1 
DS148 (PA)005  11.10.2021
Elevations and Sections
as Proposed - Block 3 
DS148 (PA)007  11.10.2021
Elevations and Sections
as Proposed - Block 4 
DS148 (PA)008  11.10.2021
Elevations as Proposed
- Block 2 
DS148 (PA)006  11.10.2021
Proposed Roof Plan  DS148 (PA)003
Rev B 
15.06.2022
Proposed Ground Floor
Plan 
DS148 (PA)001
Rev B 
15.06.2022
Room Type Layout
Plans as Proposed 
DS148 (RL)001  11.10.2021
Proposed Floor and
Elevation Plans - Bin
Store 
DS148 (PA)012  15.11.2021
Proposed First Floor
Plan 
DS148 (PA)002
Rev B 
15.06.2022
Swept path 1 7096 41 Rev B  15.06.2022
A864 upgrading 1 of 2 7096 51C A1  10.08.2022
A864 upgrading 2 of 2 7096 52C A1.  10.08.2022
Adoptable street lighting  22035 LTG 001  23.05.2022 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
2. The land and premises to which this permission relates shall only be used solely for
accommodation of persons employed by Ardfin Estate and their immediate family
members and  for no other use including any other purpose in Class 7 of the Town
and Country Planning (Use Classes) (Scotland) Order 1997 and the General Permitted
Development Order 1992 (as amended). 
Reason: To enable the Planning Authority to control any subsequent change of use
which might otherwise benefit from deemed permission in order to protect the amenity
of the locale.

Page 12

3. Notwithstanding the provisions of Condition 1, the development hereby approved shall
not be first occupied prior to completion of works to widen the carriageway of the A846
to accommodate a new 2.00m wide footway and associated drainage between the
dwelling known as 1 Woodside and the new development road, as per the applicant's
updated plans reference 7096-51 Rev C and 7096-52 Rev C. 
Reason: In the interests of road safety  
4. Notwithstanding the provisions of Condition 1, no development shall commence until
details for the provision of adoptable standard street lighting between the dwelling
known as 1 Woodside and the development site have been submitted to and approved
in writing by the Planning Authority in consultation with the Roads Authority. Thereafter
the adoptable standard streetlighting shall be installed in accordance with the duly
approved details prior to the first occupation of the 
Reason: In the interests of road safety  
5. Notwithstanding the provisions of Condition 1, no development shall commence until
details for the provision of traffic calming measures at the junction of the private estate
road and the prospectively adoptable residential service road connecting the
development to the A846 have been submitted to and approved in writing by the
Planning Authority in consultation with the Roads Authority. Thereafter the traffic
calming measures shall be installed in accordance with the duly approved details prior
to the development being first occupied, and shall be retained thereafter. 
Reason: In the interest of road safety.  
6. Notwithstanding the provisions of Condition 1, no development shall commence until
details of the intended means of surface water drainage to serve the development and
its access have been submitted to and approved in writing by the Planning Authority
in consultation with the Roads Authority. 
All surface water drainage systems to be designed according to CIRA C753 and
Sewers for Scotland 4th Edition and discharge of surface water from the site should
be attenuated to the greenfield run-off rate. 
The duly approved scheme shall be implemented in full concurrently with the
development that it is intended to serve and shall be operational prior to the
occupation of the development and maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and
to prevent flooding.  
7. The parking and turning area, including a turning head for a commercial vehicle, shall
be laid out and surfaced in accordance with the details shown on the approved plans
prior to the development first being occupied and shall thereafter be maintained clear
of obstruction for the parking and manoeuvring of vehicles. 
Reason: In the interest of road safety.  
8. No development shall commence until, a Traffic Management Plan has been
submitted for the written approval of the Planning Authority in consultation with the
Roads Authority. The Plan shall detail approved access routes, agreed operational
practices (including avoidance of convoy movements, specifying conduct in use of
passing places, identification of turning areas, reporting of verge damage, safety

Page 13

measures to protect users of residential service roads) and shall provide for the
provision of an appropriate Code of Practice to drivers of construction and delivery
vehicles.  The development shall be implemented in accordance with the duly
approved Traffic Management Plan.  
Reason: To address abnormal traffic associated with the development in the interests
of road safety.   
9. Notwithstanding the provisions of condition 1, no development shall commence until
details of the means of construction and route of the proposed remote footpath
connecting the development to the A846 have been submitted to and approved by the
Planning Authority in consultation with the Roads Authority and the Council’s Access
Officer. The submitted details shall show provision of a level access footpath and
include details of gradient, and groundworks required for implementation. The footpath
shall be implemented in accordance with the duly approved details prior to the first
occupation of the development, unless an alternative timescale for completion is
earlier agreed in writing with the Planning Authority. 
Reason: To ensure the provision of an accessible remote footpath and in the absence
of full detail being provided in relation to the implementation of this element of the
development.  
10. No development shall commence until a scheme for the retention and safeguarding
of trees during construction has been submitted to and approved by the Planning
Authority. The scheme shall comprise: 
i) Details of all trees to be removed and the location and canopy spread
of trees to be retained as part of the development;
ii) A programme of measures for the protection of trees during
construction works which shall include fencing at least one metre
beyond the canopy spread of each tree in accordance with BS
5837:2005 “Trees in Relation to Construction”. 
Tree protection measures shall be implemented for the full duration of construction
works in accordance with the duly approved scheme. No trees shall be lopped, topped
or felled other than in accordance with the details of the approved scheme unless
otherwise approved in writing by the Planning Authority. 
Reason: In order to retain trees as part of the development in the interests of amenity
and nature conservation.  
11. No development shall commence until a scheme of boundary treatment, surface
treatment and landscaping has been submitted to and approved in writing by the
Planning Authority, in consultation with Nature Scotland. The scheme shall comprise
a planting plan and schedule which shall include details of: 
i) Existing and proposed ground levels in relation to an identified fixed
datum;
ii) Existing landscaping features and vegetation to be retained;
iii) Location design and materials of proposed walls, fences and gates;
iv) Proposed soft and hard landscaping works including the location,
species and size of every tree/shrub to be planted, new planting should
be of appropriate native species.;
v) A programme for the timing, method of implementation, completion and
subsequent on-going maintenance.

Page 14

All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme unless otherwise approved in writing by the Planning Authority. 
Any trees/shrubs which within a period of five years from the completion of the
approved landscaping scheme fail to become established, die, become seriously
diseased, or are removed or damaged shall be replaced in the following planting
season with equivalent numbers, sizes and species as those originally required to be
planted unless otherwise approved in writing by the Planning Authority. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity, and to protect the special qualities of the adjacent Craighouse
Ravines SSSI from non-native species.  
12. Notwithstanding Article 3 Class 14 of the of the Town and Country Planning (General
Permitted Development) (Scotland) Order 1992 as amended, no storage of building
materials, vehicles, plant, equipment or site accommodation shall be undertaken
outwith the boundary of the application site, unless otherwise agreed in writing by the
Planning Authority in consultation with Nature Scotland. 
Reason: In order to protect natural heritage assets in the interest of nature
conservation.  
13. Given the proximity of the neighbouring residential properties to the site address, the
hours of these proposed works should be restricted to 0800 – 1800 hours Monday to
Friday, 0800 – 1300 hours Saturday and not at all on Sunday, Bank or Scottish Public
Holidays.
Reason: To minimise the impact of noise, generated by construction activities, on
occupiers of residential properties.  
14. The noise level from the operation of the air source heat pump must not exceed 42dB  
LAeq(5 min) at one metre from the window of a habitable room on the façade of any
neighbouring residential property. If, in the opinion of the local planning authority, the
proposed air source heat pump results in any noise nuisance to an occupant of any 
neighbouring residential property, the applicant shall install noise mitigation measures
agreed and approved in writing by the planning authority. 
Reason: In order to safeguard neighbouring property from any potential noise
nuisance in the interests of residential amenity. 
15. The development hereby approved shall not be brought into use until a Waste    
Management Plan for the development has been submitted to and approved in writing
by the Planning Authority.  This shall provide details of the proposed arrangements for
the storage, segregation, collection and recycling of waste arising within the site
including the location, access and maintenance for on-site storage facilities.  The
requirements of the plan shall be implemented during the life of the development other
than in the event of any revision thereof being approved in writing by the Planning  
Authority. 
Reason:  In order to accord with the principles of sustainable waste management.  
16. Notwithstanding the effect of Condition 1, no development shall commence until
samples of materials to be used in the construction of external walls and roofs have
been submitted to and approved in writing by the Planning Authority. The development

Page 15

shall thereafter be completed using the approved materials or such alternatives as
may be agreed in writing with the Planning Authority. 
Reason: In order to integrate the development into its surroundings.

Page 16

NOTE TO APPLICANT 
 The length of the permission: This planning permission will last only for three years
from the date of this decision notice, unless the development has been started within
that period [See section 58(1) of the Town and Country Planning (Scotland) Act 1997
(as amended).] 
 In order to comply with Section 27A(1) of the Town and Country Planning (Scotland) Act
1997, prior to works commencing on site it is the responsibility of the developer to
complete and submit the attached ‘Notice of Initiation of Development’ to the Planning
Authority specifying the date on which the development will start. 
 In order to comply with Section 27B(1) of the Town and Country Planning (Scotland) Act
1997 it is the responsibility of the developer to submit the attached ‘Notice of Completion’
to the Planning Authority specifying the date upon which the development was
completed. 
 All proposed developments require to submit a Pre-Development Enquiry (PDE) Form
to be submitted directly to Scottish Water via our Customer Portal prior to any formal
Technical Application being submitted. This will allow us to fully appraise the proposals.
Where it is confirmed through the PDE process that mitigation works are necessary to
support a development, the cost of these works is to be met by the developer, which
Scottish Water can contribute towards through Reasonable Cost Contribution
regulations. 
 Unfortunately, according to the records there is no public Scottish Water, waste water
infrastructure within the vicinity of this proposed development therefore they would
advise the applicant to investigate private treatment options. 
 Further advice on SuDS can be found in SEPA’s Standing Advice for Small Scale
Development – www.sepa.org.uk 
 A Road Opening Permit under the Roads (Scotland) Act 1984 must be obtained from
the Council’s Roads Engineers prior to the formation/alteration of a junction with the
public road. 
 The access shall be constructed and drained to ensure that no surface water is
discharged onto the public road. 
 Given the proximity of the neighbouring residential properties to the site address,
construction works shall be restricted to 0800-1800 hours Mondays to Fridays, 0800-
1300 hours on Saturdays and not at all on Sundays. Bank or Scottish Public Holidays. 
 Regard should be had to Scottish Natural Heritage’s consultation comments in relation
to the proposed development which provide further detail in respect of species/habitats
which may be affected and the developer’s responsibilities and obligations under nature
conservation legislation.
 Regards should be had to the council’s Public Protection response. To have multiple
occupants in a house in Scotland, you need a license from the local authority. If you rent
a house to multiple occupants in Scotland you will need a license from your local
authority if the property has three or more unrelated occupants and it is their main
residence. This applies whether or not the landlord lives at the property. There are also
circumstances where a license would be required where a property is let to provide

Page 17

occupants with a place of principle accommodation while they undertake work or
studies. More information is available, and the license can be applied for, through the
Argyll and Bute Council website. The applicant can also contact Regulatory Services to
discuss this matter further. 
 An alternative means of foul drainage is likely to constitute a material amendment
requiring a further planning application. Private drainage arrangements are also subject
to separate regulation by Building Standards and SEPA. 
 Disruption of neighbouring amenity arising as a result of traffic movements with regards
to light or noise should be monitored and advised to the councils public protection
service as required.

Page 18

APPENDIX A – RELATIVE TO APPLICATION NUMBER: 21/02141/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
A. Settlement Strategy 
Policy Overview: 
The proposal relates to an irregularly shaped 1.87ha site which is located within the defined
‘settlement area’ of the Key Rural Settlement of Craighouse as defined by the Argyll and Bute
Local Development Plan 2015. Policy LDP DM 1 provides general support for up to and
including ‘medium’ scale development subject to compliance with all other relevant policies in
the LDP. 
The proposal seeks detailed planning permission for the development of staff accommodation
for Ardfin Estate. The accommodation will comprise of 26 single bed apartments and 7 double
bedroom apartments (33 apartments in total with a maximum occupancy of 40 persons) across
four blocks. Each apartment will contain its own sleeping, cooking and bathroom facilities but
will share communal recreational facilities and spaces which will include an assembly area
and breakout spaces. The proposed development is considered to fall within the provisions of
Use Class 7 of the Town and Country Planning (Use Classes)(Scotland) Order 1997 and its
use as a staff village for Ardfin Estate would operate in a manner similar to hostel
accommodation. The proposal accordingly requires to be assessed against the provisions of
policy SG LDP BUS 1 and SG LDP BUS 5 with regards to the scale being large rather than
medium. 
The provisions of policy LDP 5 sets out that the Council will support the development of new
industry and business which helps deliver sustainable economic growth. The supporting detail
to policy LDP 5 identifies Jura as being both an ‘Economically Fragile Area’ and a ‘Tourism
Development Area’. 
SG LDP BUS 1 seeks to support business and industry development (Use Classes 4, 5, 6 and
7) of up to ‘medium’ scale on appropriate sites within the ‘settlement area’ of Craighouse. SG
LDP BUS 1 sets out the following requirements: 
A) Development is of a form, location and scale consistent with policy LDP DM 1;
B) Greenfield sites are avoided if brownfield land is available in close proximity;
C) In residential locations the proposed development would not erode the residential
character of the area, or adversely affect local residents, through an increase in traffic
levels, noise fumes or hours of operation;
D) The proposal is consistent with any other relevant Local Development Plan policy and
associated SG;
E) Technical standards in terms of parking, traffic circulation, vehicular access and servicing,
and pedestrian access are met in full;
F) The design, scale and siting of the new development respects the landscape/townscape
character and appearance of the surrounding area. 
Schedule B1 appended to SG LDP BUS 1 sets out the scales of development. ‘Medium’ scale
development is defined as ‘buildings between 200sqm and 600sqm footprint, gross site area
between 0.5ha and 2ha’. The provisions of Schedule B1 also note that within ‘Economically
Fragile Areas’ consideration will be given to variation of permitted scales of development in
line with policy SG LDP BUS 5.

Page 19

In operation however, SG LDP BUS 5 effectively overrides the settlement strategy
considerations built into SG LDP BUS 1 as it sets out that in the Economically Fragile Areas
that consideration will be given to variation of permitted scales of development where: 
i) It has been demonstrated that no suitable preferred location is available;
ii) The proposal is directly linked to the main potential growth sectors supported by
the LDP and EDAP;
iii) A sustainability checklist has been completed and it has been demonstrated that
any concerns that have been identified over the sustainability of the proposal can
be addressed satisfactorily;
iv) Greenfield sites are avoided if brownfield land is available;
v) In residential locations the proposed development would not erode the residential
character of the area, or adversely affect local residents, through an increase in
traffic levels, noise fumes or hours of operation;
vi) The proposal is consistent with any other relevant Local Development Plan policy
and associated SG;
vii) Technical standards in terms of parking, traffic circulation, vehicular access and
servicing, and pedestrian access are met in full;
viii) The design, scale and siting of the new development respects the
landscape/townscape character and appearance of the surrounding area. 
The explanatory text accompanying SG LDP BUS 5 confirms that whilst the LDP sets out a
settlement strategy which provides a framework for development which provides a framework
to deliver sustainable development the provisions of SG LDP BUS 5 serve to provide
additional flexibility for the planning system in support of LDP objectives for sustainable
economic growth and to support population retention and growth. 
The provisions of LDP 5 also set out support for tourism and tourism related development.
Whilst the current proposal does not seek to provide tourism accommodation it has been
identified in the supporting information that the proposal is intended to provide essential staff
accommodation related to the local employment generating businesses at Ardfin Hotel and
Golf Course. The statement further sets out that currently staff are housed in temporary
accommodation on the Estate which is not considered to be a sustainable option in either the
medium or longer term. The proposal is claimed to be integral to the successful operation of
the existing Hotels and Golf Course businesses and the attendant increase in employment
and opportunities. With the Jura Hotel in Craighouse recently acquired by the applicant, a
permanent staff facility for the two main hotel sites is regarded by the proposer as essential.
The option of using the Jura hotel as staff accommodation has not been deemed viable long
term to the business or the local community. The existing staff are housed in temporary
accommodation or ‘pods’ located throughout the Estate but this is neither a long - or medium
- term sustainable option. 
Assessment of the Proposal: 
The site is wholly within the Key Rural Settlement of Craighouse/Keils and within the Jura
National Scenic Area (NSA).  Jura is both an Economically Fragile Area, and a Tourism
Development Area which are Key Policy Themes for Growing Our Economy Together in the
council’s Local Development Plan (LDP). The settlement designation is not forecast to alter
with regards to the provisions of the councils emerging LDP 2 (Local Development Plan). The
proposed site includes an area of land presently being developed as access arrangements for
ten affordable dwellinghouses (under separate approval 17/03311/PP) and affording access
to the A843. 
The current application relates to the provision of new staff accommodation for Ardfin Estate.
The proposed development has a gross building floor area of 1111sqm within a development

Page 20

site area of 1.8ha. The staff accommodation falls under Use Class 7 and accordingly having
regard to Schedule B1 is a ‘large’ scale business and industry development. The details within
the application identify that the development is necessary to replace existing temporary staff
accommodation to house up to 40 members of staff during the summer season employed
locally at Ardfin and Jura Hotels and Golf Course. A lower number of residents would be
expected during the off season. 
Whilst the proposal is not intended to directly provided improved visitor facilities it would seek
to support the existing tourist related activity at Ardfin and the wider island.
The council’s Economic Development Action Plan (EDAP) for this area has an ongoing
commitment to investing in accommodation for workers to be trained and skilled in key sectors
of the islands’ economies which support tourism. Generally this is focussed on food and drink,
and the opportunity to house staff to be trained in a dual sports/hospitality sector to learn new
skills and to transfer skills they bring to the sector is consistent with the EDAS investment
aims. The over-arching aim to invest in transport is generally aimed at high profile projects,
but the required roads infrastructure improvement for this project may be seen as a benefit for
the settlement overall and all visitors to the island.     
The original premise for the estate development was as a private, invitee resource but has
since developed into a more commercial entity. Initially it was self-contained and although
figures are not readily available is unlikely to have been other than a self-contained venture
offering little economic multiplier to the island economy. Currently there are 34 full-time staff,
30 of which reside on Jura and four travel from Islay each day. 9 staff have their own property
and 21 are in existing Ardfin staff housing. Staff housing is usually on a shared basis with a
room allocated, although there are also some senior staff in dedicated houses. The existing
staff housing is spread across the island in different locations, up to nine miles away from
Ardfin Hotel. Additionally around 20 seasonal staff are generally required who stay in existing
staff housing on a shared basis. A high standard of accommodation is the key to retaining
quality staff which the proposal is intended to address and potentially release five or six houses
into the Island’s general housing stock. 
Similarly employment levels for servicing the golf course and accommodation are not readily
available. As the business model has developed, the required staff are using temporary
accommodation which is unsuitable for long term use, and not an acceptable solution in spatial
planning terms. Permanent accommodation of a good standard within the settlement is seen
to contribute to the stability of the accommodation provision and an economic multiplier within
the community.       
The application is accompanied by supporting information that advises that a location within
Craighouse is desirable both to provide residents access to established services and facilities
in the settlement but also to provide a degree of amenity and a residential environment through
physical separation from their place of work. The supporting information and Sustainability
Checklist accompanying the application identifies that other locations on the Estate were
discounted for the opportunity to develop within an established ‘settlement area’ as defined by
the LDP as opposed to a countryside location. Consideration of PDA 11/3 elsewhere in
Craighouse located above the Distillery was discounted as the site lay outwith the applicant’s
ownership and is not available for purchase. It was identified as croft land, is identified for
housing, and had potential safeguarding issues. Officers are unaware of any other suitable
areas either within an allocation, the wider ‘settlement area’ or ‘brownfield’ locations on Jura
which would be suitable for a development of this scale or which should be considered a
sequentially preferable location for the development. The development is intended to meet a
location requirement for staff accommodation in South Jura and it would not be appropriate to
extend consideration of alternative locations.

Page 21

The development is located within a ‘residential location’ and the effect of the development
upon the amenity of the locale, including existing residential property is subject to detailed
assessment in Section B below. 
The development is located within the Jura National Scenic Area. The impact of the design,
scale and siting of the development upon the receiving landscape is considered in detail in
Section F below. 
The proposed development is located within the Craighouse ‘settlement area’; the proposal
would be accessible by public transport links and makes provision for improved pedestrian
access into the settlement which will also be of benefit to the residents of adjacent housing
development and other road users. The Estate recognises the benefit of providing a shuttle
bus from the proposed site to minimise private car journeys. The central location of the new
staff facility makes this possible and feasible which has the added benefit of reducing travel
by car. A detailed assessment of access and infrastructure requirements is set out in
sections G and H below. 
In summary, the proposal represents a ‘large scale’ business and industry development within
the ‘settlement area’ of the Key Rural Settlement of Craighouse where a clear
locational/operational need to provide staff accommodation has been demonstrated by the
applicant. The provisions of SG LDP BUS 5 recognise the requirement for flexibility within
‘Economically Fragile Areas’ such as Jura and make provision for the normal scales of
supported development in the Council’s Settlement Strategy to be varied to accommodate up
to ‘large scale’ development in appropriate circumstances. Accordingly, it is considered that
the principle of the development is consistent with policies LDP STRAT 1, LDP DM 1, LDP 5,
SG LDP BUS 1, and SG LDP BUS 5. 
B. Nature and Design of Proposed Development 
The proposal requires to be assessed against the provisions of policy LDP 9 and SG LDP
Sustainable in terms of development setting, layout and design. 
The provisions of policy LDP 9 set out that new development shall be required to be sited and
positioned so as to pay regard to the context within which it is located, that the development
layout and density shall effectively integrate with the setting of the development, and that the
design of the development shall be compatible with its surroundings. 
The provisions of SG LDP Sustainable relating to ‘isolated industrial/commercial development’
set out that the form and pattern of the landscape will largely determine the acceptability of
the proposal. The extent to which the proposals would be clearly be visible from public roads,
viewpoints and neighbouring local communities is also an important factor. When assessing
the appearance of ‘isolated commercial development’ the planning authority are required to
consider the size and extent of the proposals including visual impact, the location and its
landscape setting, and the design and colour of the development and ancillary structures. 
The application relates to a site area of 1.8 hectares located to the immediate north east of a
new affordable housing development located on the south eastern fringe of the settlement of
Craighouse. The application site is previously undeveloped land around 200m south of the
distillery and hotel; the site is bounded to the east by a strip of woodland that adjoins the A846,
to the north and west by open gently sloping land, and to the south by a new housing
development which will provide a shared means of access to the public road with the existing
access being continued to form the cu-de sac around which the new courtyard is built. 
The land to be developed for the four blocks is north of the new housing development and will
extend its access into the cul de sac compound. The land to be used is the flatter south west

Page 22

of the site with the northerly (more steep) area to be retained as woodland or turfed for amenity
spaces. A proposed footpath from the rear of the site to a new footpath at the main road may
be created in this area. The bin store will be centrally located within the four blocks. The
parking will mainly be to the rear of the large westerly block with smaller parking (more
accessible) strips between the other blocks. 
The proposal consists of four accommodation blocks that will be laid out in a courtyard style.
The proposed buildings comprise a mix of single storey and 1½ storey design rooted in a
traditional design emphasis with the utilisation of long, narrow building form, narrow gables,
windows with a vertical emphasis, symmetrically pitched roofs to further break up the overall
massing of the development into a number of smaller elements which are attuned to the scale,
massing and appearance of existing buildings in the locality. External finishes also reflect the
use of traditional building materials within the wider locality through the use of white render,
and natural slate. The use of untreated timber cladding and metal standing seam roof cladding
is more contemporary in nature but would not be out of keeping with the rural locality and the
element of variation in finishes will help to emphasise the small scale components which
contribute to the larger grouping of buildings. The overall form and massing of the collective
building components reflects the traditional grouping of a farm/estate grouping of working
buildings and whilst substantial remains compatible with a rural setting. 
In total the development provides for 26 single apartments and 7 double apartments (inclusive
of 2 accessible rooms). The 33 units comprise 40 bed spaces. Whilst the development type is
categorised within the LDP under ‘business and industry’ the Class 7 use is solely intended
for occupation by staff employed by Ardfin Estate and as such might however be expected to
share characteristics with a flatted residential development as opposed to a commercial
workplace or hotel/hostel frequented by tourists.   
Block 1 is an ‘L’ shaped building of 1½ storey design building and single storey wing with a
footprint of 485sqm floor space containing 14 ensuite single bedsit apartments and 3 ensuite
double bedsit apartments with 3 communal kitchen/dining/seating areas. The building form is
broken by a pend to provide vehicular access to the rear parking area and also features
porches, dormer windows and inset balcony detailing. The 1½ storey main section will be
finished in white render and slate roof with a small amount of timber inset detailing; the single
storey return wing will be finished in timber cladding and a metal standing seam roof. 
Block 2 is a single storey building of rectangular 125sqm floorspace of hipped roof gable
design and set out an angle of 45degrees from the northern end of Block 1 to both address
the internal road line which provides access to a rear car park beyond but also provide an
element of enclosure to the courtyard layout. This building will contain 6 ensuite single bedsit
apartments. The building will be finished in white render and natural slate with timber cladding
detail around window and door openings. 
Block 3 is a single storey building with an ‘H’ shaped footprint extending to 378sqm floorspace.
Two parallel wings running East to West across the site are connected by a central,
perpendicular link. Whilst the building is single storey the building has a stepped ridgeline as
the northern wing adapts to a slight change in ground levels. The building contains 6 single
bedsit apartments, 2 double bedsit apartments, a large communal kitchen and dining area and
laundry facilities, the northern wing also includes a mezzanine floor above the plant room, and
a snug space in the attic above the communal kitchen/dining area. The building also contains
a plantroom for a district heating system with an external flue. The southern wing shall be
finished in white render, natural slate with timber detailing; the central wing shall be finished
in a mix of white render and timber cladding with a slate roof; and the northern wing which
houses the shared facilities and plantroom will be finished in metal standing seam walls and
roof covering, and timber detailing. A timber fenced, communal bin store shall site immediately
to the north of this building.

Page 23

Block 4 is a small 1½ storey building containing 2 double ensuite apartments with
123sqm floorspace. The building design includes dormer windows with inset balconies
and a lean-to porch. The building shall be finished in white render and natural slate
with timber detailing. 
The proposal will introduce a ‘large scale’ commercial activity into what is a quiet rural,
residential area and accordingly requires to be considered against the relevant provisions of
policy SG LDP BAD 1 which sets out that ‘bad neighbour’ developments will only be permitted 
where there are no unacceptable adverse effects on amenity; where the proposal includes
appropriate measures to reduce the impact on amenity or public service provision objections;
and where technical standards in terms of parking, traffic circulation, vehicular access and
servicing, and pedestrian access are met in full. The nearest Class 9 houses will be those of
the housing association currently under construction. The arrangement of the proposal is not
deemed to introduce any overlooking or shadowing issues in this regard. The buildings face
into each other across a central courtyard which will also act as a containment for the most
common issues which may occur and are contrary to this policy.  The Council’s Environmental
Health Officer has not raised any objection on the likely operational impact of the proposed
development upon the amenity of neighbouring residential property although a condition to
mitigate disturbance during the construction period has been advised. In this respect it is
considered that the shared access to the main road is not deemed intensification of vehicle
use nor noise or light impacts above expected in a residential area. The likely shift working
nature of the residents is not deemed likely to cause a concentration of cooking activity at
specific times resulting in intensification of smells. It is unlikely that any agreed proposal will
reach full occupancy for some time allowing the council’s officers to assess any issues and
act accordingly. Building 3 includes a full height space for a plant room and an Air Source
Heat Pump within a special housing is also proposed. The noise generated by these
operations will be subject to control by condition of any approval. 
The proposal is considered to be consistent with policy LDP 9, SG Sustainable, and SG LDP
BAD 1.   
C. Natural Environment 
The site lies outwith but close to Craighouse Ravine, Jura SSSI designated for its bryophyte
assemblage and upland oak woodland features. The designated site is outwith the
development site although the neighbouring road will be required for construction movements. 
Nature Scotland have advised that, subject to appropriate mitigation measure, the proposed
development is unlikely to have any significant effect on the qualifying interests of the SSSI
designation. 
Nature Scotland have however advised that conditions be imposed to preclude machinery or
materials entering or being stored within the SSSI in order to avoid ground damage to the site.
It is also advised that any tree planting proposed as part of landscaping are of native species
in order to prevent the spread of non-native species to the SSSI woodland. 
Similarly the water resources in the ravine which form an important part of the habitat must
also be protected especially with regard to spillage or subsidence into the water course which
may harm riparian habitats and wildlife and the general ecology of the protected area 
Conditions will be applied to any approval in these respects and to conform with policies LDP
3, SG LDP ENV 1, SG LDP ENV 2 and SG LDP ENV 4, SG LDP, ENV 6 and SG LDP ENV 7.

Page 24

D.         Historic Environment 
The proposed development does not give rise to any direct or indirect effects upon the site or
setting of any listed building, scheduled monument, or conservation area. 
E.         Impact on Woodland 
The provisions of policies LDP 3, LDP 10 and SG LDP ENV 6 would all seek to resist
development which has an adverse impact upon existing trees/woodland. The proposed path
from the site through existing woodland will necessarily require some clearing with
compensatory planting required as a condition of any approval. The neighbouring woodland
in the ravine opposite will not be subject to any disturbance under the plans. 
In the absence of full detail of the route, construction and requirement for tree felling required
for installation of the proposed remote footpath it would be appropriate to impose conditions
for submission and approval of such details to ensure compliance with LDP 3 and SG LDP
ENV 6. 
F.          Landscape Character 
The application site is located within the Jura National Scenic Area and requires its impact
upon landscape to be assessed against the provisions of LDP 3 and SG LDP ENV 12. 
The provisions of SG LDP ENV 12 set out that the Council will look to resist any development
in or affecting National Scenic Areas that would have an adverse impact upon the integrity of
the area, or that would undermine the Special Qualities of the area, unless it is adequately
demonstrated that any significant adverse effects on the landscape quality for which the area
has been designated are clearly outweighed by social, environmental, or economic benefits
of national importance. 
Impact on the Jura National Scenic Area 
The whole of the site is within the NSA and therefore the design and siting as discussed earlier
is critical for any decision. During the site visit by the officer it was established that there are
few accessible viewpoints from where the site and the scale of the proposed buildings will be
visible. These are from the road and the approached where a low rise cluster of buildings
would not be unexpected within this part of the settlement. Views from off the island towards
Craighouse are not expected to be interrupted or the landscape altered or ridges breached
due to the scale and positioning. The Jura Housing Capacity report of 2007 identified the area
around the Coastguard Station as fragmented within the settlement and the Woodside and
current developments have partially addressed this. The current proposal fills the gap to the
back of the station and is therefore consistent with the identified vision of this document. The
proposed materials are also deemed to be consistent with the landscape colourings and those
of the prominent buildings within the settlement. 
Nature Scotland have noted that the development is located within the settlement zone of
Craighouse and is sited close to existing built developments, both residential and commercial
in nature including large scale distillery buildings. It is further advised by Nature Scotland that
the proposal is not considered likely to have a significant effect on the special qualities of the
Jura NSA. 
The proposal is consistent with policies LDP 3 SG LDP ENV 12 and SG LDP ENV 14.

Page 25

G.  Road Network, Parking and Associated Transport Matters. 
The provisions of policy LDP 11 set out that the Council will seek to ensure that an appropriate
standard of access is delivered to serve new developments, including off-site highway
improvements where appropriate. The provisions of policies SG LDP TRAN 4 and SG LDP
TRAN 6 set out the Council’s requirements in respect of site access and parking provision. 
In this instance the development will connect onto an existing shared surface, prospectively
maintainable adoptable road that currently terminates in a cul de sac within an existing West
Highland Housing affordable housing development. A proposed new private road shall be
formed from the termination of the social housing road to serve the new development.
Provision of 36 parking bays shall be provided on site. It is proposed that all new car parking
spaces are formed from porous paving to allow natural discharge back to the existing soil. It
is also noted that by locating the new facility within the settlement, staff will be able access
facilities and services at Craighouse on foot or by bicycle which will reduce reliance on travel
by car. In terms of transport of the staff to Jura House, the Estate will provide a shuttle bus to 
minimise private car journeys. The central location of the new staff facility makes this 
possible and feasible which has the added benefit of reducing travel by car. 
The application includes for carriageway widening of the A846 and provision of a 2m wide
adoptable standard footway from 1 Woodside (to the east) to the social housing development
road. Additionally new adoptable streetlighting shall also be provided from 1 Woodside to
termination of the public road where it connects to the private access; improved drainage will
also be installed on the section of A846. 
The proposals to enhance the existing access arrangements have been developed in
consultation with the Council’s Roads officers who have not raised objection subject to the
imposition of conditions relating to the delivery of the necessary road improvements and
parking, and for the provision of details of additional traffic calming measures to ensure that
drivers entering onto the public road from the development do so at a safe speed bearing in
mind that this is a shared surface serving residential development. 
The proposal is considered to comply with policies with LDP 11, SG LDP TRAN 3, TRAN 4
and SG LDP TRAN 6 and national standards of parking. 
H. Infrastructure / Waste Management 
Foul drainage and water supply shall be by connection to Scottish Water infrastructure.
Scottish Water have not objected but did comment that the site is not currently served by a
foul drainage connection; it is understood that the development will however connect in to
recently installed public sewerage connection serving adjacent housing development. Scottish
water have advised this proposed development may be fed from Craighouse Water Treatment
Works. Unfortunately they are unable to confirm capacity currently so they suggest that the
applicant completes a PreDevelopment Enquiry (PDE) Form and submits it directly to Scottish
Water via their Customer Portal or contact Development Services. 
The proposal has included a centrally placed bin storage area for the proposal. Its design,
access and positioning is acceptable in terms of the specific proposal and the wider area within
the NSA under policies LDP 10 and SG LDP SERV 5(b).   
The main access road joining to that already under construction from the main road will 
drain via road gullies into the existing surface water sewer tail which extends onto the  
main sewer.

Page 26

The buildings surface water drainage will be discharged back to the soil via soakaway trenches
whose design will be determined based on the findings of a Phase 2 site investigation which
aims to determine the site’s soil porosity. The foul drainage from the new buildings is proposed
to connect to the existing foul water tail which extends from the neighbouring site development
and onto the main road sewer. The contours of the site allow for a design to work gravitationally
and will be subject to compliance with SEPA regulations and Scottish Water connection
approval. 
The proposal is acceptable under policies LDP 10 and SG LDP SERV 1.