Democracy Spraffa

2201248 Supplementary Report No.2 TPA 01.12.22

Argyll and Bute Council · 9 December 2022
Back to Planning, Protective Services and Licensing Committee — 9 December 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle
_________________________________________________________________________ 
Reference No:   22/01248/PP
Planning Hierarchy:  Local Development
Applicant:   Mr Richard Stein
Proposal: Erection of detached garden room ancillary to dwellinghouse
Site Address: Eilean Da Mheinn, Harbour Island, Crinan, Lochgilphead, Argyll
and Bute, PA31 8SW
________________________________________________________________________
SUPPLEMENTARY REPORT NO. 2
1.0 INTRODUCTION 
The attention of Members is drawn to the main Report of Handling dated 5th October 2022,
and Supplementary Report No. 1 dated 18th October 2022 for consideration in respect of the
above application.
This report seeks to updated Members on matters arising subsequent to the PPSL meeting
on 19th October 2022, and Members decision to continue the application for a pre-
determination hearing. These include:
 Receipt of late consultation comments from West of Scotland Archaeology Service;
 Further supporting information from the applicant;
 One late representation raising objection to the application. 
2.0 ARCHAEOLOGY: DETAIL AND FURTHER POLICY ASSESSMENT
A late consultation comment has been received from the Council’s retained archaeological
advisors, the West of Scotland Archaeology Service (WoSAS) on 11th November 2022.
WoSAS have identified that the application lies within an area of archaeological sensitivity and
potential which is centred on Dunadd and Kilmartin and based upon relatively high density of
recorded sites and finds from the surrounding landscape. It is noted that the proposal will affect
the unrecorded remains of a possible structure of unknown date and function and may reveal
buried archaeological remains.
Note: Full details of the consultee response can be view on the Council’s website at
www.argyll-bute.gov.uk
It is highlighted that the provisions of policy LDP 3 and SG LDP ENV 20 set out the relevant
provisions for the consideration of archaeological interests and the protection of
archaeological remains where development is proposed.
In this instance there is no information to indicate that the site is itself of archaeological
significance other than its location within a wider area of interest/sensitivity. On this basis it is

Page 2

noted that WoSAS have not raised objection to the proposal but have recommended that, in
the event that planning permission were to be granted, it would be appropriate to impose a
condition requiring ground breaking works to be subject to an archaeological watching brief.
Officers would advise that an additional planning condition is required to address this matter
and ensure compliance with policies LDP 3 and SG LDP ENV 20; an augmented list of
conditions is accordingly appended to this report.
3.0 FURTHER SUPPORTING INFORMATION
Members are advised that the applicant has submitted further correspondence dated 30th
November 2022 expressing willingness to enter into either a Unilateral Agreement or Planning
Obligation under S75 of the Act if this was necessary in the event that Members of PPSL
shared concerns expressed by third party objectors that the proposed development may be a
foothold to further development unrelated to the main dwellinghouse. It is intimated that any
such title burden would provide an undertaking to retain the proposed development in a single
ownership and for exclusive use as ancillary to the main dwellinghouse, in perpetuity
Officers would advise that the proposed list of planning conditions already include condition 2
which provides clarification and instruction that the proposed building shall not be used for
purposes independent of the main dwellinghouse and as such the requirement for express
planning permission to extend, significantly alter or materially change the use of the building
should theoretically provide sufficient security in this respect. It is however observed that the
imposition of a title burden would be a valid means of further underpinning this objective if,
following their deliberations, members had any substantive concern about the prospect of the
land being sub-divided as the imposition of a title burden would provide the additional comfort
of precluding any possibility of the development being legally separated from the ownership
of the main dwelling in the future without the planning authorities consent.
The applicant has also noted the comments provided by WoSAS and confirmed their
acceptance to an archaeological watching brief condition being imposed on any permission. 
4.0 REPRESENTATIONS
Late representations have been received from six additional parties raising objection to the
proposal in addition to further representations from two parties who had previously raised
objection as follows:
 Alexi Murdoch (email dated 02.12.22) (addendum to earlier representation)
 Iain MacDonald, Oran Na Mara, Knockrome, Isle of Jura (06.12.22)
 Yvonne MacDonald, Oran Na Mara, Knockrome, Isle of Jura (06.12.22)
 Michael Gordon, Duncraig, Iona (email dated 06.12.22)
 Kate Gordon, Duncraig, Iona (email dated 06.12.22)
 John MacFarlane, Crinan (email dated 07.12.22) (addendum to earlier
representation)
 Alec Bowman-Clarke, Rothesay (email dated 07.12.22)
 Josienne Clarke, Rothesay (email dated 07.12.22)
The total number of individuals making representations to this application now stand at 131
in total including 59 third party expressions of support, and 71 expressions raising objection.
Note: Full details of all representations can be view on the Council’s website at www.argyll-
bute.gov.uk
The issues raised are summarised as follows:

Page 3

 It is suggested that officers have incorrectly identified that application site as
being located within a ‘settlement area’ in their report of handling.
Officer Comment: It would appear that this comment relates to officer commentary in
Section R of the main report of handling; on review it is confirmed that this is a
typographical error and should read as ‘settlement strategy’ and not ‘settlement area’. It
is noted that the remainder of the commentary in the report clearly identifies the
application site as being located within ‘Very Sensitive Countryside’ when referencing the
assessment to LDP settlement strategy.
 To what extent the proposed new building may or may not be visible is
immaterial when considering the Development Management Zone in which it is
proposed--which categorically does not allow for it.
Officer Comment: It is agreed, the visibility of the development is not a factor that is
directly relevant with regard to the assessment of a proposal in relation to policy LDP DM
1.
 This Policy is a key tool for managing and protecting sensitive and quality
landscape across the whole of Argyll and Bute.
Officer Comment: Whilst the disposition of the settlement zones is to a large extent
influenced by the sensitivity of landscape and other constraints it is noted that the impact
of new development upon the landscape is a matter that is directly considered under the
separate policy provision of Policy LDP 3 and related Supplementary Guidance, in this
instance SG LDP ENV 12 which relates to development within or affecting a National
Scenic Area.
 This landscape is one of Argyll and Bute’s most valuable resources and its
protection is of the highest priority—as laid out in National Policy as well.
Officer Comment: The location of the proposed development within the Knapdale
National Scenic Area is identified and subject to detailed assessment in the main report
of handling. The impact of the proposal upon the NSA designation is assessed in relation
to Policy LDP 3 and SG LDP ENV 12.
 Any attempt to undermine this Policy—which would also set a harmful
precedent across the whole Council Area--should be resisted.
Officer Comment: Officers would contend that their interpretation and application of both
policies LDP DM 1 and LDP ENV 3 in relation to the circumstances of the current
application are consistent with the manner in which the LDP is intended to operate.
Every planning application is required to be considered on its own merits and with due
regard to the Development Plan and any other material considerations and in this
respect it is unclear on what basis objectors consider that a harmful precedent would be
set through approval of the current application.
 The suggestion that the site is a managed garden, while questionable in itself,
is immaterial as there is nowhere in policy that suggests it may supersede the
control imposed by the Very Sensitive Countryside Zone.
Officer Comment: It is noted that this assertion is fundamentally incorrect. The provisions
of policy LDP DM 1 (F) set out the limited circumstances under which development that
is to be located within the Very Sensitive Countryside may be supported, and as such
consideration as to whether the proposal is aligned with Policy LDP DM 1 is fundamental

Page 4

to establishing whether or not the LDP is supportive in principle of the development
subject to compatibility with all other relevant policies 
LDP DM 1 (F)(iii) extends support to “development directly supporting agricultural,
aquaculture, nature conservation or other established activity.” 
The proposed development which is subject of this application is intended to be utilised
for purposes that are ancillary to the applicant’s existing dwellinghouse and as such is a
development which will directly support an “established activity” which already exists at
this location. It is worth clarifying that, in assessing this application, officers have
recognised that whilst the island is in a single ownership it would not be accurate to
describe the extent of the island as the ‘curtilage’ of the dwellinghouse and as such have
sought to satisfy themselves that the location where the development is proposed forms
part of the “established activity” which it is intended to support before affording support
under the provisions of Policy LDP DM 1 (F)(iii).
“Curtilage” is not defined in the Town and Country Planning (Scotland) Act 1997 however the
following definition is provided by the Scottish Government within their published Guidance
on Householder Permitted Development Rights (updated 2021) as:
“curtilage … is accepted to mean land which is used for the comfortable enjoyment of
a building and which serves the purpose of that building in some necessary or
reasonably useful way. It need not be marked off or enclosed in any way. Normally
the curtilage would relate to the property boundary of the dwellinghouse.”
In their assessment of the application officers have observed that the management of land
and its immediate character differs across the extent of the island. The existing
dwellinghouse is located in a sheltered location at the centre of the island and is adjoined by
a readily identifiable area of immediate curtilage comprising planting areas, lawns, seating
areas, and domestic outbuildings. The northern and southern extremities of the island by
contrast show little or no evidence of use for domestic purposes and comprise of rock
outcrops, bracken and tree cover. The contained, centrally located valley within which the
application site is located does however evidence longer term use as an extended garden
area formed along the alignment of access between the dwellinghouse and the existing
boathouse at the south of the island. Whilst it is accepted that the applicant appears to have
undertaken recent maintenance and improvements within this area there is also evidence of
longer established activity which relates directly to the residential occupation of the
dwellinghouse on the island with the presence of framed bedding areas, relatively level
grassy open areas, drainage channels, and a number of well-established garden plants/non-
native trees, in addition to the existing boathouse and slipway.
 It is queried why the application site boundary relating to the current
application is significantly larger than the smaller ‘curtilage’ area identified by
the applicant as the application site boundary in their 2017 submission
(17/01819/PP).
Officer Comment: It is noted that the 2017 application related to development that sought to
extend the existing dwellinghouse and identifies a square plot of 30m x 28m around the
footprint of the dwellinghouse as the application site area. On review it is considered that the
previous application site does not accurately reflect the full extent of land utilised for
purposes ancillary to the residential occupation of the dwellinghouse; it is further noted
however that given the location of the development on an island within a single ownership
the identification of a smaller site area would not have impacted procedurally on any
notification requirements associated with that earlier application. The application site as

Page 5

defined in the current submission is a matter for the applicant however, as noted above, the
extended site area has not been accepted without query in officer’s assessment of whether
the land forms part of an “established activity” at this location.
 It is queried whether a statement within the supporting information
accompanying the previous withdrawn application (21/02308/PP) that the
curtilage of the dwelling extended to the whole of the island was supported by
officers.
Officer Comment: It is confirmed that officers do not accept that the curtilage of the dwelling
extends to the whole of the island. Detail in this respect is provided above.  
 The ‘ruin' is, by the Officers’ own Report, immaterial.
Officer Comment: The presence of the ruined building is noted in officers report however it is
correct to state that its presence has not been attributed significant weighting in establishing
the acceptability in principle of development at this location in respect of policy LDP DM 1.
 The decision of officers to recommend approval of the current application for
the garden room, the earlier withdrawn application, and a previous application
for extension of the dwellinghouse has been queried. It is requested that the
planning hearing seeks to review officers recommendations on all of these
matters.
Officer Comment: It is noted in the first instance that the purpose of the current proceedings
are to reach a determination on the proposal set out in the current application. The intimation
of any impropriety on the part of officers or the applicant in respect of the handling of the
current application and previous matters is strenuously refuted. In the event that an aggrieved
party sought to raise issue about the conduct or competency of officers, or the manner in
which a planning application has been handled then those issues should be raised via the
Council’s Corporate Complaint Process.
 The inclusion of reference to a boat slip in the northwest of the island (beside
the dwellinghouse) is queried. 
Officer Comment: It is firstly noted that this detail does not form part of the current application,
however for the purposes of clarity it is officers understanding that this area was utilised for
importation of materials required for the implementation of the 2017 house extension.
 Concern is raised that during the PPSL meeting on 19th October 2022 a member
of the committee expressed his opinion that the application should be approved
based on viewing Google Maps prior to any presentation from officers or
deliberation of the PPSL Committee on the merits of the application.
Officer Comment: It is noted that this issue relates to commentary from Cllr Kain which related
to members discussion on the requirement for a pre-determination hearing/site visit rather and
did not express a view either way in relation to whether permission should be granted or
refused as is intimated. 
5.0 UPDATED RECOMMENDATION 
It is recommended that, subject to a pre-determination hearing being held, that planning
permission be granted subject to the augmented list of conditions and reasons appended to
this report.

Page 6

Author of Report: Tiwaah Antwi          Date: 8th December 2022 
Reviewing Officer: Peter Bain    Date: 8th December 2022 
Fergus Murray 
Head of Development and Economic Growth

Page 7

CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 22/01248/PP 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 14/06/2022, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Proximity and Location Plan AR/287/A/01  25/08/2022
Site Plan with Curtilage (1:1250) AR/287/A/02  25/08/2022
Site Plan (1:250) AR/287/A/03  25/08/2022
Proposed Elevations AR/287/A/05  26/07/2022
Proposed Elevation, Sections and Plans AR/287/A/04  26/07/2022 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
2. Notwithstanding the provisions of Class 9 of the Town and Country Planning (Use
Classes) (Scotland) Order 1997, the building hereby permitted shall be utilised solely
as a structure ancillary to the occupation of the main dwelling and shall not be occupied
independently thereof as a separate dwelling unit. 
Reason: To define the permission on the basis of the Planning Authority’s assessment
of the use applied for. 
Note to Applicant: 
For the avoidance of doubt this permission only provides for the occupation of the
ancillary building and the main dwelling by a single household and their non-paying
guests. Specifically the occupation of the building independently from that of the main
dwelling (e.g. as a separate fulltime residence or a holiday letting unit) shall require
the benefit of a separate planning permission.  
3. Notwithstanding the provisions of Condition 1, the proposed path improvement to be
carried out between the boathouse and the application site for the delivery of materials
and construction of the garden room, hereby approved, shall be removed and the
ground reinstated within three months following completion of the structure. 
Reason: To ensure the development integrates into its surroundings, in the interest of
visual amenity.  
4. No development or ground breaking works shall commence until a method statement
for an archaeological watching brief has been submitted to and approved in writing by
the Planning Authority in consultation with the West of Scotland Archaeology Service. 
The method statement shall be prepared by a suitably qualified person and shall
provide for the recording, recovery and reporting of items of interest or finds within the
application site.

Page 8

The name of the archaeological organisation retained by the developer shall be given
to the Planning Authority and to the West of Scotland Archaeology Service in writing
not less than 14 days before development commences. 
Thereafter the development shall be implemented in accordance with the duly
approved details with the suitably qualified person being afforded access at all
reasonable times during ground disturbance works. 
Reason: In order to protect archaeological resources.