Democracy Spraffa

Appendix 1: Perth and Kinross Education and Children’s Services Accessibility Strategy Action Plan 2022-2025: Progress Report May 2024

Perth and Kinross Council · 29 May 2024
Back to Learning and Families Committee — 29 May 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

1 
Perth and Kinross Council 
Education and Children’s Services 
Accessibility Strategy Action Plan 2022-2025
Progress Report May 2024 
Appendix 1

Page 2

2 
Summary Report 
Duty Progress to date Case Study/Appendix
Link
Duty 1:
Increase the
extent to
which pupils
with disability
can participate
in the
curriculum 
✓ All schools have begun implementation of CIRCLE, some have not fully completed the first phase
(considering inclusive social and physical environments and associated adaptations for their
learners) due to other priorities within the school, or individual circumstances of staff.  In a survey
of school leaders conducted last term, we found that 85% of schools had achieved or were on track
to achieve universal CIRCLE by Summer 2023.  
✓ All Secondary schools engaged with the VSE process by June 2023 with a focus on the 4 pillars of
Inclusion. The overall report for these is being shared. 
✓ iPads have been provided through the COVID recovery allocation and Strike funding to support
learning and communication in all Intensive Support Provisions (ISPs), with 5 devices being
provided for each class. 
✓ Eleven primary schools have been supported to provide enhanced support for new P1 children with
significant levels of additional support needs.
✓ In partnership with CALL Scotland and NHS Tayside Speech & Language Therapy, ISP are
focusing on key themes to improve accessibility of the curriculum for learners.
✓ The ASN Assessment Framework has been created in preparation for rollout to all schools in
August 2024.
✓ To improve decision-making, the Assisted Technology Panel has been restructured and is piloting
new referral process with two all-through schools: Breadalbane and St John’s 
✓ CLPL calendar for 2024/2025 provided to HTs on HT days 13th & 14th March 2024 with a variety of
accessibility sessions.  Training included sessions on use of Apple and Microsoft technology to
support children and young people with ASN to access learning.
✓ Over the past 2 years PKC have established an ASN PEPAS Group that consists of an Active
Schools, Disability Scotland, Fairview School and Central Team representatives.  PE teachers
attend a twice-yearly development day which has introduced ASN CLPL opportunities for them to
attend, this also incorporates training on making PE accessible for all within the mainstream and
intensive support settings.  PKC PEPAS Group run termly drop-in sessions that are available to all
practitioners across PKC schools and under extra-curricular sporting activities four key events are
currently being delivered and run each year by PKC.
✓ Effective planning sessions with Disability Scotland Representative has supported the development
of adaptations to events schools participate in to ensure accessibility for all.  This includes Active
Schools supporting a group of young people with additional support needs, some of whom attend
Perth College, taking part in our Creative Day of Dance.
Appendix 1 - Crieff
Primary School –
Implementation of
CIRCLE: Physical
Environment 
Appendix 2 - Perth
Grammar –
Implementation of
CIRCLE: Physical
Environment 
Appendix 3 – Digital
Learning Team CLPL
Calendar 2024-25
Appendix 5 - Sensory
Services – examples for
Accessibility Strategy 
Appendix 5 - Sensory
Services – examples for
Accessibility Strategy 
Case Study 1 - Perth
Primary and Secondary
School – Supporting
Learners with English as
an Additional Language 
Case Study 2 - Oakbank
Primary School - Oakbank
PS Implementation of
CIRCLE across setting

Page 3

3 
✓ Three secondary schools actively took part in an Anne Frank workshop offer, this supported 66
pupils to become peer guides for the exhibition which received 1690 visitors from the wider
community.
✓ Over 202 and 2023, 4 primary schools received delivery of Nil By Mouth school workshops with
over 203 primary pupils engaging in the programme; 2 sessions have also been delivered at St
John’s Academy engaging with 120 secondary pupils.
✓ Heartstone Story Circles awareness sessions were delivered to teachers and introduced within 6
primary schools engaging primary 5 pupils through discussion from a storybook context.
and P1 enhanced support
provision 
Duty 2:
Improve the
physical
environment of
schools to
enable better
access to
education and
associated
services. 
✓ Riverside Primary School opened in term 4 last session with an ISP which has a specially designed
outdoor space.
✓ Work has been undertaken to improve access to safe outdoor areas in ELC settings and schools.
✓ A CIRCLE Physical Environment Universal Springboard resource has been developed. Primary
schools that have actively been using this resource have reported that it has helped support
classroom practice and are keen for other aspects to be incorporated, ie Structures & Routines and
Social Environment.  The Universal Springboard working group has presented the primary-focused
Physical Environment Universal Springboard to a group of secondary Pupil Support Teachers and
received support for the development of an equivalent secondary-focused resource to support their
schools with the implementation of their universal offer.   
✓ All Outreach Teachers are actively using visuals to support learners across the primary schools
they are supporting.
✓ An audit of ISP learning environments has been completed to inform planning to improve the
quality and consistency of this provision within the overall learning estate.
✓ Planning is underway to support Connections (part-time Intensive-level provision for primary-aged
children with social, emotional and behavioural needs) to move to more suitable premises at Perth
Grammar School Community Wing.
✓ Equalities TEAM in PKC have supported all secondary schools to embed Place Standard
conversations as a starting point to create equality networks or link into school networks already in
place.  
✓ The Equalities team participate in the Relationship Steering Group to represent groups of children
and young people with protective characteristics.
✓ Safe to be Me programme was delivered by The Scottish Ballet 30 pupils from S1 at Perth
Academy.  
✓ Show Racism the Red Card workshops engaged 367 pupils from 17 primary schools.
Case Study 3 - Riverside
Primary School Building
Planning – Planning for
Accessibility in
collaboration with Senior
Leadership Team and PKC
ECS Central Team 
Duty 3: Improve
communication
with pupils with
✓ NHS Tayside Speech & Language Team provided training on communication and language for all
school staff to access.

Page 4

4 
disability along
with
communicating
to them
information that
is provided in
writing for
pupils who are
not disabled, in
appropriate
alternative
formats and
taking account
of any
preferences
expressed by
them and their
parents
✓ Most Early Years settings have a Communication Champion to support all learners to meet
communication milestones. 
✓ Inclusion teams have delivered 2 Support Staff In-service days offering a wide range of training
opportunities; 180 support staff members attended on each day.  Feedback was positive with over
90% strongly agreeing or agreeing that the day was valuable and would have a positive impact on
their practice in the classroom.
✓ Early Years Inclusion Team links with NHS Tayside and Parent to Parent to ensure that transition
planning is robust for children starting nursery and that parents are well informed and have easy
access to information.  
✓ Strategies and guidance developed have summarised written versions and short video resources
to improve the accessibility of key messages. 
✓ Two Inclusion Ambassador groups have been supported to establish, one in Strathearn (Crieff
High LMG) and one in Perth (Fairview and Perth High LMG).  The Inclusion Ambassadors continue
to meet regularly, and are developing information on ‘Raising Awareness’, to improve
understanding of additional support needs by peers and staff and are informing the ASN
Transformation Programme.  
✓ ASN Parents Network involving Parent Council representative has met each term, this group has
informed the development of written information for parents on CIRCLE and is developing written
information for parents on the new ASN Child/Young Person Plan paperwork and process.  
✓ Parents have been supported to have increased information to support their child when they are
transitioning from nursery to P1 or from P7 to S1.  These parent sessions have been delivered by
Education in collaboration with Parent2Parent and Perth Autism Support.
Progress Report: March 2024
Duty 1: Increase the extent to which pupils with disability can participate in the curriculum. 
National Improvement Framework Priority – Placing the human rights and needs of every child and young person at the center of education. 
HGIOS QIs 2.2, 2.3, 3.1, 3.2
Outcome
(What the improvement will be
for children and young people)
Actions
(What we will do to achieve this
improvement)
Progress
Children and young people fully
engage in learning through an
inclusive environment which
includes appropriate
differentiation, and inclusive
1) School and ELC staff will
complete training on the
Inclusive Classroom Scale
(complete scale, make,
implement, & review a plan)
October 2023
✓ All schools have begun implementation of CIRCLE, some have not fully
completed the first phase (considering inclusive social and physical environments

Page 5

5 
attitudes that help them to
enjoy learning and build a
sense of confidence and
resilience.
2) All Secondary schools
complete a Validated Self-
Evaluation and implement any
identified improvement actions
and associated adaptations for their learners) due to other priorities within the
school, or individual circumstances of particular staff. 
✓ The survey conducted last term with school leaders showed us that 85% of
responding schools had achieved or were on track to complete CIRCLE at the
universal level with all teachers by the end of the summer term 2023. 
✓ 15% (5 schools) reported that 100% completion of this target would be carried
over to 23-24. 
✓ Over 50% of schools had gone beyond this and were on track to have completed
implementation at the additional level by June 2023 (considering the individual
needs and associated adaptations).
✓ All Secondary schools engaged with the VSE process in session 2022/23 with a
focus on the 4 pillars of Inclusion. 
Appendix 1 - Crieff Primary School – Implementation of CIRCLE: Physical
Environment
Appendix 2 – Perth Grammar – Implementation of CIRCLE: Physical
Environment 
March 2024
✓ Further updates have been made as part of the CIRCLE Universal Springboard
documentation – the working group have now completed the Social Environment
and Structures and Routines focus areas.
✓ A survey has been designed and data will be gathered In May ’24 to provide an
updated picture on CIRCLE implementation across schools. This data will be used
to identify schools to be offered targeted support to embed the process of self-
evaluating and enhancing inclusive environments and considering how to develop
the participation of individual learners.
Next Steps
✓ Additional sections of the Universal Springboard are to be piloted and shared with
PPSTs in supporting schools and guidance to be completed in supporting the roll
out of the Universal Springboard to all schools in August 2024.
✓ Development of a Secondary Universal Springboard.
✓ Increase the availability of suitably equipped quiet spaces in schools through use
of budget motion funding.
Appendix 5 - Sensory Services – examples for Accessibility Strategy

Page 6

6 
3) Using improvement
methodology through
technology to improve
curricular accessibility and
communication environments
for non-verbal learners with
complex needs in PKC ISPs
March 2024
✓ CALL Scotland and S&LT in partnership with PKC ISP provisions are starting to
focus on key themes to support practitioners in improving accessibility for learners
✓ Inchview ISP has had a session with CALL Scotland and S&LT to explore how
communication can be better supported specifically for their learners; a further
session is planned with Tulloch Primary ISP.  
✓ Twilight training sessions have been carried out and CALL Scotland staff have
been into the ISPs to model the effective use of communication aids for non-
verbal learners.
✓ PKC have distributed iPads from COVID recovery and strike funding to all ISPs
and all have been equipped with appropriate technology required to support and
meet learners needs.
Next Steps
✓ In collaboration with CALL Scotland and NHS Tayside Speech and Language
Therapy, the Inclusion service will create a toolkit to continue to support and
upskill practitioners across all ISPs in supporting communication with non-verbal
learners. 
Children and young people’s
learning experiences and
achievement is improved
through increased staff
awareness, knowledge and
understanding of needs and the
strategies, resources,
equipment, and technology that
support participation in the
curriculum.
3) Develop an Identification
and Assessment Framework to
support school staff to meet
needs of children and young
people with additional support
needs
October 2023
✓ An ASN Assessment Framework has been finalised and will be shared with all
schools in June 2024 alongside the Staged Levels of Intervention Framework and
the CYPP Guidance
✓ Over 171 practitioners provided feedback on CLPL Training sessions in 2022-23,
with 23% providing feedback on inclusive practice training they had attended. 
35% attended due to wanting to gain more knowledge and understanding in
inclusive practice and over 30% attended due to it being an area of school
improvement relating to the universal offer to meet the needs of all learners with
additional support needs in their schools
✓ All PPSTs and Outreach Teachers regularly attended a variety of different CLPL
training opportunities in session 2022-23 which has now led to Special Interest
working groups being set up to further enhance and extend staff knowledge and
understanding within inclusion
✓ 11 PKC Primary schools have worked with the Inclusion service to deliver
Enhanced support for children who joined P1 with a significant level of additional
4) Staff will have access to
strategies, training, resources,
equipment, and technology to
meet needs of children and
young people

Page 7

7 
support needs. There has been some positive feedback from schools about this
approach. The feedback on what hasn’t worked so well is being used to review
the allocation and type of support provided for the new P1 classes where such
support is required.  
March 2024
✓ Assisted Technology Panel has been split into two groups, Curriculum
Accessibility, and Communication – new referral process is currently being piloted
with two all-through schools: Breadalbane and St John’s 
✓ The curriculum accessibility group meet once every 4-6 weeks to review new
referrals to make recommendations of support either at authority level or needing
a CALL Scotland referral made – this will be reviewed in April before being rolled
out to all schools
✓ Universal Support list created with QR codes signposting to self-guided learning 
Draft Universal Support Checklist- Jan 2024.pdf
✓ Training of PPSTs planned for 8th May
✓ PKCs P1 Enhanced Support offer has gathered its Year 1 evaluations in
preparation for planning for Session 2024-25.  Data gathered highlighted the
following parent feedback:
o 90% felt satisfied with their child’s transition into P1
o 100% felt communication with schools was the most helpful aspect along
with 90% gaining a better understanding of what was included in P1
enhanced support
o 90% felt that the support provided for their child was effective with parents
feeling without this additional support their child would not have managed
in a mainstream P1 class setting
o Parents felt the challenges were ensuring all staff were aware of care
plan/risk assessments in place in supporting their child and lateness in
identifying key staff who would be working with their child
✓ A P1 Enhanced Support Working Group has been established consisting of the
Early Years and Inclusion Team members to build on this feedback in moving
forward with planning for Session 2024-25

Page 8

8 
✓ £48k was spent on equipment purchased to support children and young people
with additional support needs to access their learning in the school setting. 
Systems were established to enable better recycling of specialist equipment to
improve sustainability and effective use of funding.
Case Study 2 – Oakbank Primary School - Contact Oakbank PS to gather good
practice information on the P1 enhanced support provision and their successes
from this
Appendix 5 - Sensory Services – examples for Accessibility Strategy 
Next Steps
✓ Special Interest working groups led by Primary Pupil Support Teachers and
Outreach Teachers will support Inclusive Practice improvement workstreams.
Children and young people will
be more independent in their
learning and access to the
curriculum, enabling improved
attainment
5) Through training all
teachers and support staff will
develop their awareness of
learning tools on Office 365,
which increases access to the
curriculum.
October 2023
✓ School practitioners have engaged in CALL Scotland free webinars over the
course of the year.  These are readily available for all PKC practitioners and are
sign posted to via the Digital Coordinators.
✓ The Digital Coordinators have an EDMS site sign posting or supporting access to
a variety of inclusive practice digital training for all PKC practitioners.
✓ A CLPL calendar of available digital training for the 2023/24 year was published
and given to all HTs in March 2023. 
✓ The Digital Team have also recorded a Microsoft & Windows Accessibility
Webinar which can be accessed by practitioners at any time in our dedicated
EDMS team.
March 2024
✓ 6th March 2024- Apple Accessibility Training- recording can be found here 
ECS Universal Supports Apple - 6 March 2024-20240306_160026-
Meeting Recording.mp4
✓ 21st February 2024- Microsoft Accessibility Training- recording can be found here 
Universal Supports- Using Microsoft to Support Learners Needs-
20240221_160000-Meeting Recording.mp4

Page 9

9 
✓ The Digital Team have a YouTube channel and self-directed professional
development site here, which has a designated section on the support we provide
for accessibility - Welcome! – Perth and Kinross Digital CLPL Site
(glowscotland.org.uk)
Next Steps
✓ CLPL calendar for 2024/2025 provided to HTs on HT days 13th & 14th March 2024
with a variety of accessibility sessions (see Appendix 3).
Appendix 3 – Digital Learning Team CLPL Calendar 2024-25 
All children and young people
with a disability will have
access to physical education
curriculum and extra-curricular
sporting activities
6) Further broaden the range
of physical activity
opportunities available.
October 2023
✓ Over the past 2 years PKC have established an ASN PEPAS Group that consists
of an Active Schools, Disability Scotland, Fairview School and Central Team
representatives.  This is a support network to look at and review accessibility for
all within the physical education curriculum and extra-curricular sporting activities
✓ PE teachers attend a twice-yearly development day which has introduced ASN
CLPL opportunities for them to attend, this also incorporates training on making
PE accessible for all within the mainstream and intensive support settings
✓ PKC PEPAS Group run termly drop-in sessions that are available to all
practitioners across PKC schools.  This supports practitioners in discussing and
seeking advice on how to adapt PE activities to meet all learners needs as well as
discussing how to support young people with more complex needs
✓ This offer is not just held to termly sessions, regular comms goes out to schools
for practitioners to get in touch with the PKC PEPAS Group if they have any
queries out with the termly drop-in sessions which the group support with
✓ Under extra-curricular sporting activities, four key events are currently being
delivered and run each year by PKC:
o Cross-country
o Athletics
o St Andrews Day of Dance
o Creative Day of Dance

Page 10

10 
✓ Effective planning sessions with Disability Scotland Representative has supported
the development of adaptations to events and looking at alternative measures to
ensure accessibility for all
March 2024
✓ Planning for this year’s Creative Day of Dance at the Concert Hall considered the
sensory and physical needs of young people attending.  An additional space has
been provided that is a quieter space and provides the option for young people to
access if they require this to meet their needs with events being co-coordinated to
happen within this additional space too
✓ The Cross-Country event is to include an additional race for ASN learners as well
as adaptations being made to the course to meet all learners needs whilst
ensuring that the competitiveness nature of the sporting event has not been lost
✓ In partnership with Active Schools, they have led on a few projects aimed at
improving access to extra-curricular activities and some curricular activities -
specifically in Fariview School. Providing the following:
o UHI Perth Fitness students delivered a 12-week block of curriculum
fitness sessions
o UHI Perth Coaching students delivering 3-week blocks of extra-curricular
sessions at SHIP @ Fairview after-school club
o Active Schools Modern Apprentice delivering 6-week block of extra-
curricular sessions at SHIP @ Fairview after-school club
o Tayside Judo offered curriculum Judo sessions to pupils at Fairview
o Curriculum fitness/weight-loss programme with targeted pupils working
with LAL colleagues in the Wellbeing Team 
✓ As a wider Active School Team – they have shared and promote SDS/PKDS
events with all school contacts and young people
✓ In collaboration with Scottish Disability Sport funding has been secured to provide
an Inclusive PE workshop for class teachers and PE specialists working with
pupils with disabilities in PE and school sport in a mainstream environment
Next Steps

Page 11

11 
✓ Increase the profile of the ASN PEPAS drop-in sessions which provide advice and
guidance to enable PE delivered in mainstream and specialist settings to be more
inclusive.
✓ Raise awareness with schools of the increased inclusivity of sports events and
review the barriers to children and young people attending events. 
School curriculum will include a
focus on equality and diversity
in range of subject areas
7) Schools will participate in
the national review of Personal
and Social Education and
implement subsequent
recommendations.  Options to
include development of other
subject areas will be explored.
October 2023
✓ Anne Frank Workshops have been implemented across PKC schools for the past
30 years for pupils to learn from the uniquely inspiring life and work of Anne Frank
and be empowered to become voices for equality in schools. Three secondary
schools took part in this workshop and a total of 66 pupils engaged in being a
peer guide for the exhibition which had approximately 1700 visitors.  
✓ The Anne Frank Trust also worked with 11 of our primary schools and reached
483 pupils across PKC.
✓ Nil By Mouth school workshops focus on raising awareness of the issues
surrounding sectarianism within our society and has been delivering the Pause B4
U programme which helps children better understand the impact of online bullying
and discrimination.  In 2022-23 4 primary schools received delivery of these
workshops with over 203 primary pupils engaging in the programme.  2 sessions
have also been delivered at St John’s Academy engaging with 120 secondary
pupils.
✓ Heartstone Story Circles awareness sessions were delivered to teachers and
introduced within 6 primary schools engaging primary 5 pupils through discussion
from a storybook context.  The impact of this was that it raised awareness
amongst the children, supporting them to be confident that they can deal with an
incident of hate/intolerance if they come across it.
✓ PKC Education management team provided a response to the national
consultation on the delivery of RSHP curriculum. Awareness of the consultation
was also raised with Parent Council chairs. 
Case Study 1 - Perth Primary and Secondary School – Supporting Learners
with English as an Additional Language 
March 2024
✓ Between October 2023 and March 2024, the Anne Frank Trust Workshops
involved work with 3 primary and 4 secondary schools reaching a total of 1782
young people.  Workshops covered Antisemitism, Anti-black racism, Gender

Page 12

12 
equality and homophobia, History today and talks by Holocaust Survivor Dr Martin
Stern MBE.
✓ Between October 2023 and March 2024 2 primary schools have received Nil by
Mouth workshops with 144 young people attending. A further 2 primary schools
received copies of the ‘Neeps and Tatties’ book for work between St Andrews Day
and Burns Night. 
Next Steps
✓ Work with Champions Boards to develop awareness raising resource in relation to
experiences of living in care to share with their school communities.
✓ Promote awareness of needs of armed forces families with school staff.
✓ Work with the Inclusion Ambassadors groups to improve understanding of
additional support needs within peer group.
Children and young people with
a disability have access to
efficient and inclusive school
transport provision
8) Develop guidance to
support implementation of the
Home/School Transport Policy
to ensure provision of a
service which meets needs of
pupils with a disability
October 2023
✓ Currently being developed
March 2024
✓ This activity has been delayed due to transformation programmes
Next Steps
✓ Develop guidance for schools and information for parents with regards to enacting
the policy in place regarding home/school transportation. Work with children,
young people, parents and carers to explore options to increase independent
travel 
Duty 2: Improve the physical environment of schools to enable better access to education and associated services. 
National Improvement Framework Priority – Placing the human rights and needs of every child and young person at the centre of education
HGIOS QIs 1.5, 3.1
Outcome
(What the improvement will be for
children and young people)
Actions
(What we will do to achieve this
improvement)
Year 1 Progress
1) Riverside Primary School will
be designed and constructed to
October 2023

Page 13

13 
Children and young people with
disabilities will benefit from well-
planned learning spaces
meet the needs of all its
learners.
✓ All stakeholders had an active voice in the design of their new school building
at Riverside Primary School to ensure it met the needs of all its learners. 
✓ New school opened in term 4 last session with an ISP. Feedback indicates
the design is better for meeting a range of learner needs. School has an ISP
with specially designed outdoor space.
Case Study 3 - Riverside Primary School Building Planning – Planning for
Accessibility in collaboration with Senior Leadership Team and PKC ECS
Central Team 
March 2024
✓ Learning from Riverside PS design will inform planning for any new schools.  
✓ Over £260k was spent on improving learning spaces for children and young
people with additional support needs in 2023/34, this included £154k on
fencing to improve safe access to outdoor spaces in 14 ELC settings and
schools.
Next Steps
✓ Support the planning towards the opening of Perth High School.
✓ Support any further planning for any new schools. 
✓ Work with the Property service to inform the Learning Estate Strategy
✓ Develop the ASN Transformation workstream to inform decision-making on
the location and profile of Intensive Support Provisions to improve locality
access and range of ASN able to be supported.  
2) The ASN Transformation
Programme will include a
workstream to ensure the
School Estate Strategy plans
effectively for current and
projected additional support
needs, including disability. 
Children and young people with
ASD, sensory and/or
communication processing needs
are supported through appropriate
images, signage, and visual
references.
3) Guidance will be developed to
support ELC settings and
schools to effectively use
images, signage, and visual
references to appropriately
support children and young
people.
October 2023
✓ All Outreach Teachers are actively using visuals to support learners across
PKC primary schools they are supporting
✓ A few primary schools across PKC have introduced visual timetables within
their settings as part of ongoing universal support for all learners
✓ Inclusion Teams, ie PPSTs/Outreach Teachers are further building their
confidence and understanding of the importance of the effective use of
visuals at universal and additional stages of support to develop increased
use across PKC schools
✓ Majority of primary schools across PKC are becoming more familiar with the
use of the visual supports section within the Physical Environment Universal
Springboard.  This includes PPSTs supporting school SLT and practitioner
teams to look at their physical environments across the school setting and
implementing visual supports and aids to meet the learning needs of all.  Key

Page 14

14 
aspects focus on visuals in use; consistent format; visual cues; cultural
diversity; labelling; visual timetable and visual clutter.
✓ Almost all schools that have actively been using the universal springboard
has reported to PPSTs that it has been well received and keen for other
aspects to be implemented, ie Structures & Routines and Social Environment
March 2024
✓ Universal Springboard working group has delivered the Physical Environment
Springboard to PKC secondary PSTs with positive feedback and
acknowledgement for something similar to be produced to support secondary
schools with the implementation of their universal offer
✓ All Headteachers received a presentation on understanding the ASN profile
of your school and building a universal support offer to meet the predominant
needs identified in the profile.
✓ Universal Springboard Working Group have now completed the
documentation and visual prompts for both the Social Environment and
Structures & Routines areas from CIRCLE and is currently out for
consultation with the wider Inclusion Team and PKC HTs/QIOs
Next Steps
✓ More Primary schools will be supported to embed use of the Physical
Environment Universal Springboard and a similar Secondary resource will be
developed.
✓ All school will be supported to increase their use of visuals to aid
communication through the use of Boardmaker following the agreement of a
5-year license that will extend to all schools.  
Pupils from equality-protected
groups will have a positive school
experience and will feel safe and
respected in school and when
online
4) Schools will be provided with
information on action days to
improve equality and
encouraged to support activity to
raise awareness in their school
or ELC setting, i.e.
• Show Racism the Red
Card
• Autism Acceptance
Month
• Pride
October 2023 
✓ Equalities TEAM in PKC have now contacted all secondary schools to embed
Place Standard conversations as a starting point to create equality networks
or link into school networks already in place.  This is to ensure that the voices
of all pupils are heard and that everyone feels they can contribute to the life
and work of the school.  These conversations have helped to identify and
determine what each school network would like to work on or what area the
Equalities Team can help with, ie leading on activities with the school on key
dates in the calendar, help with raising awareness, and sharing lived
experiences.

Page 15

15 
✓ 3 Secondary Schools requested the Equalities team be an active part of their
conversations, 2 of the schools had the team take part and identify next steps
in moving this forward with 181 young peoples’ voices being heard
✓ Equalities team were represented on the working group at Crieff High School
to draft the schools revised Anti-bullying policy
✓ Next steps are to make contact with a further 8 high schools to set up and
hold Place Standard conversations with pupil groups
✓ The Equalities team is also now represented on the Relationship Steering
Group to support with concerns being highlighted around pupil social and
emotional learning
✓ In session 2022-23, 39 schools, 1147 children and young people,
participated in Show Racism the Red Card workshops
✓ The Scottish Ballet worked with Perth Academy to deliver the Safe to be Me
programme for 30 pupils from S1.
March 2024
✓ Work by the Equalities team with 3 further secondary schools has been
delayed due to staff sickness
✓ 17 primary schools have participated Show Racism the Red Card partnership
within 367 pupils attending educational workshops this year; in total 13,708
children and young people in schools have received some form of anti-racism
education in PKC over the past 15 years 
Next Steps
✓ In collaboration with children and young people from equality-protected
groups Education staff will develop resources to support awareness raising of
prejudiced-based bullying following the launch of the Anti-bullying Strategy
for PKC ELC settings and schools.
5) Anti-bullying Strategy will be
reviewed
October 2023
✓ This has been updated following a series of engagement sessions with
children, young people, parents and school staff. Strategy and operational
guidance will be launched for a final consultation in term 2.
March 2024
✓ The final draft Strategy and operational guidance have been circulated to all
schools and a presentation shared with Parent Council Chairs.

Page 16

16 
Next Steps
✓ PKC Anti-bullying Strategy will be launched.  This promotes prevention of
bullying through the development of respectful relationships within school
communities and provides a clear framework to address bullying, including
prejudiced based bullying should incidents occur. 
Duty 3: Improve communication with pupils with disability along with communicating to them information that is provided in writing for pupils who are
not disabled, in appropriate alternative formats and taking account of any preferences expressed by them and their parents 
National Improvement Framework Priority – Placing the human rights and needs of every child and young person at the centre of education 
HGIOS Qis 3.1, 3.3
Outcome
(What the improvement will be for
children and young people)
Actions
(What we will do to achieve this
improvement)
Year 1 Progress
All children/young people will feel
included in communication about
their learning and life of the
school/ELC setting 
1) Staff training and guidance
materials will improve staff
awareness, knowledge and
skills in best practice and tools
to facilitate communication and
understanding of children and
young people with a disability,
i.e.:
• Makaton signing
• Communication passports
• Visual timetables
• Talking mats
• Symbolised environment
• Augmentative and
Alternative
Communication
•  signage 
October 2023 
✓ NHS Tayside Speech and Language Therapy team have provided a variety
of CLPL Training opportunities for all PKC practitioners to access.  Overall
ratings of how informative these were on average has been 98%.
✓ Most Early Years settings have a Communication Champion to support how
their setting is meeting the communication needs of all learners 
✓ A recent survey of PSAs in Early Years settings highlighted the following:
o 22 PSAs across PKC Early Years Settings had been trained in a
signing communication system
o 21 PSA were actively using Makaton within their settings
o 1 PSA was actively using British Sign Language – Level 2
o 14 PSAs were actively using a communication aid with learners
March 2024
✓ Inclusion team have delivered 2 successful Support Staff In-service days
offering a wide range of development training opportunities, with over 180
support staff members attending each day.  November’s day focused on
‘Knowing our Learners’ and offered six training workshops, with January’s
day focusing on ‘Knowing yourself in supporting our Learners’ and offered
fourteen training workshops.  Feedback was positive with 0ver 90% strongly

Page 17

17 
agreeing or agreeing that the day was valuable and would have a positive
impact on their practice.
Next Steps
✓ All In-service days will continue to have a training offer to support inclusive
practice, with a particular focus on improving relationships and behaviour and
effective assessment and planning to meet the needs of children and young
people with additional support needs. 
✓ Two members of staff will attend a Train the Trainer CLPL for Talking Mats
so that they can deliver training for ELC settings and school, including key
Inclusion staff such as PPSTs and Outreach Teachers, who can then
cascade and use with in the schools they support. 
All children beginning ELC will
transition in successfully
2) Continue to develop and
embed the pathway supporting
children with complex additional
support needs/disability to
access ELC.
October 2023
✓ TRIC have developed 4 pathways to support understanding of roles and
responsibilities to ensure clear planning for children with complex needs 
✓ 0-3 PPG continues to meet 4 x year to discuss children with complex needs
✓ 0-3 ECP links with Health and Parent to Parent to ensure that transition
planning is robust for children starting nursery
March 2024
✓ Pathways have been distributed. 
Next Steps
✓ Further develop paperwork at transition and move from care coordinator -
ELC have been agreed
✓ Implement the revised Child’s Plan paperwork in ELC settings to provide
consistency in information across ELC settings and schools
✓ Work with Early Years to ensure clear pathway for ELC staff supporting
children with ASN's
All communications are accessible
for children and young people with
ASN/ disability
3) Complete an audit of printed
and electronic information
(leaflets, template letters,
website) that is available to all
children and young people
✓ Exclusion letters have been revised to increase accessibility.  An easy read
summary of the policy is also available.
March 2024

Page 18

18 
across ECS to inform
improvement actions to improve
accessibility.
✓ Anti-bullying Strategy is supported by a summarised version to provide easily
read information on the key messages. In addition to this written information
a short key information video is available.
✓ Attendance Guidance is in final draft form and will include revised letters to
increase their accessibility.
✓ A group of parents from the ASN Parent Network are supporting the
development of guidance for parents on CIRCLE and the Child/Young
Person’s Plan
Next Steps
✓ The revised Child/Young Person’s Plan paperwork will be launched, this
supports clearer understanding of the needs of children and young people
with additional support needs and the supports that should be provided.  
✓ The revised paperwork will be available in accessible formats.
Children and young people with
ASN/disability and their parents
inform development of inclusion
policy and relevant actions.
4) Establish a Perth and Kinross
Children and Young People
Inclusion Ambassadors network
and enable them to support
engagement of other children
and young people with ASN in
policy and service
developments. 
October 2023
✓ We now have 2 Inclusion Ambassador pilot groups.  Strathearn which is
currently Crieff LMG.  We hope to include Auchterarder LMG this session.
The Perth Group is Fairview and Perth High LMG.  We hope to extend this to
include Perth Academy.  
✓ Both groups have had very successful first meetings and their second is in
late November.
✓ The groups are very much led by the young people and both groups
interestingly brought up the following topics to take forward.
✓ Classroom Environment (hoping to work with EPS as they are producing a
child friendly CIRCLE environmental checklist)
✓ Adults that work in schools’ understanding of children and young persons’
additional support need (suggestions included being involved in interviewing
new staff)
✓ Peer relationships and understanding of their additional support need.
(projects such as ‘LEANS’ were briefly discussed)
March 2024

Page 19

19 
✓ The Inclusion Ambassadors continue to meet regularly, providing invaluable
feedback and ideas to inform the ASN Transformation Programme.
✓ We are actively working to expand the Inclusion Ambassadors Groups to
ensure wider representation from all PKC schools.
✓ Our new ASN Transformation Programme Manager, Jaclyn Meikle, has been
introduced to the children and young people, and will be working closely with
the group moving forward.
✓ This term, the ambassadors are focusing on ‘Raising Awareness’.
Discussions are currently underway to organise an awareness
event/day/week for all pupils and staff within.
✓ The Crieff LMG ambassadors shared their views on priorities for
improvement with the Service Manager Inclusion and Additional Support and
the Convenor for the Learning and Families Committee, at their sessions in
December 2023 and March 2024.
Next Steps
✓ Volunteers from the existing Inclusion Ambassador groups will assist the
ASN Transformation Programme during upcoming ISP environment audits.
Their input will provide an essential pupil perspective during the review of
these learning environments, helping us identify areas for improvement.
✓ The ambassadors will work with an Inclusion QIO to review and provide
feedback on the revised Child Plan paperwork before it’s rolled out across
PKC schools.
✓ Members of the group have been capturing aspects of their ‘lived
experiences’ through various mediums such as drawings and essays. This
work will be shared via a ‘Padlet’ to increase awareness of additional support
needs by staff and peer.
5) Establish a Parents Forum for
parents of children and young
people with ASN.
October 2023
✓ Initial meeting with reps from Parent Councils to collect views of Parents as
Part of the Parent Engagement Strategy
✓ Linked with Chair of PIE strategy to ensure that actions moving forward link
with the actions from strategy
✓ The project started in February 2023 when a group of interested teachers/
PSAs and senior learners were invited to meet with a representative with

Page 20

20 
Enquire and Children in Scotland to discuss the formation of a group of
inclusion ambassadors.  
✓ Through these discussions it was decided that the best approach would be
to have a few pilot groups within the authority and build upon it from there.
✓ Crieff and Auchterarder LMGs joined together and Perth High LMG and
Fairview joined together.  We had hoped Pitlochry and Breadalbane would
also have a pilot group however this did not work out, mainly due to staff
availability.
✓ From there the two pilot groups worked together and in April shared a
presentation with CYP and information with schools and parents to
encourage CYP to apply for an inclusion ambassador position.  By June we
had formed two groups and October was the first Crieff meeting at
Strathearn art space.  A further is planned for the first Perth meeting.   The
aim is to meet again in November. 
March 2024
✓ Group have met 4 times and looked at parent’s thoughts re:
o visibility of ASN in schools
o Understanding CIRCLE
o Understanding new CYP Planning
✓ There have been parent sessions offered at key points of transition in
collaboration with Parent2Parent and Perth Autism Support
o Starting Nursery
o Nursery - P1
o P7- Secondary
✓ These sessions have focused on answering parent questions and providing
information about transition/assessment and planning and parent rights
✓ All sessions have been well attended and evaluated
Next Steps
The ASN Parent Network will 
✓ support a review of the Additional Support Needs section of the School
Handbook.
✓ Collaborate on the development of information for parents on the new
ASN Child’s Young Person’s Plan paperwork and process.
✓ Support aspects of the ASN Transformation Programme.

Page 21

21 
Appendix 1 
Crieff Primary School - Circle Implementation 
At Crieff Primary, Janet Copland the Principal teacher had worked with staff on making the school communication friendly for all prior to the introduction of
CIRCLE.  
Through the introduction of CIRCLE, all staff have worked hard to ensure their classrooms are inclusive for all pupils. They have focused on physical
environment, social environment, and routines of the class. Staff carry out circle participation scales for specific children, to ensure all needs are met.  
To ensure a consistent approach across the school every classroom has, quiet areas, self-regulation areas and fix it folders.  Visuals, using the Boardmaker
symbols are displayed on each classroom wall including, self-regulation soundbites and visual timetables. Emotion works is also embedded at every stage of
the school to ensure consistency for all pupils.

Page 22

22

Page 23

23

Page 24

24 
Appendix 2 
Perth Grammar ISP – CIRCLE Implementation: Use of Visual Aids as part of Universal Offer

Page 25

25 
Appendix 3 
PKC Digital Learning Team CLPL Calendar

Page 26

26

Page 27

27

Page 28

28

Page 29

29

Page 30

30

Page 31

31 
Appendix 4   
Kinross High School Marketplace Event – Parental Engagement Event to inform parents of allied agency supports. 
Supporting Dyslexic Learners

Page 32

32 
Appendix 5 
Sensory Services – examples for Accessibility Strategy 
Children and young people fully engage in learning through an inclusive environment which includes appropriate differentiation, and inclusive
attitudes that help them to enjoy learning and build a sense of confidence and resilience. 
A pupil at D Primary School benefits from a school team who have worked with the Hearing Support Service to understand the nature of the pupil’s deafness
and the impact it has on his ability to access the curriculum. 
The pupil wears two hearing aids.  In his early years the Teacher of the Deaf (ToD) installed a soundfield system in the classroom which, via a mic worn by the
teacher, elevated the speaker’s voice above background noise.  More recently John has begun using a Radio Aid which links a mic directly to his hearing
aids.  This overcomes noise and distance.  These adaptations enable the pupil to hear speech.  His condition also impacts on processing and understanding.  To
augment his understanding a PSA fluent in Makaton signs much of his day.  This not only enables the pupil to understand and join in with the learning, it helps
remove the frustration felt from not understanding.  Collaboration between the school team and the service has removed barriers and deepened knowledge of
deaf awareness strategies such as getting a child’s attention before speaking and not standing with a window or light behind you as this obscures the face and
the opportunity to watch lips and read facial clues.   
Children and young people’s learning experiences and achievement is improved through increased staff awareness, knowledge and understanding
of needs and the strategies, resources, equipment, and technology that support participation in the curriculum. 
A pupil at Primary has a dual impairment.  The Qualified Teacher of the Deaf (QToD)successfully trialled a Radio Aid to enable him to hear the teacher’s voice
above background noise and at a distance.  The Qualified Teacher for Visual Impairment (QTVI) The pupil also has a Kodak SL25 smart lens (camera) which
wirelessly links to a large iPad. The smart lens enables him to see more clearly things at a distance such as the board, the body language of the teacher, wall
displays etc. The Radio Aid and the smart lens offer the pupil the freedom to sit anywhere in the class, rather than having to sit near the front to see and hear
the teacher. He also has a task lamp so when the lights are dimmed (to help relaxation), he is still able to read. 
At transition points new staff are trained on how to use this equipment.  There is close and effective liaison with the school Pupil Support Teacher who proactively
contacts the service to address any technical difficulties. Regular conversations with the pupil have evidenced that the equipment enables access to the
curriculum and moreover has a positive impact on the pupil’s feeling of being included in class lessons.  These conversations between pupil and QToD/QTVI
have also help increase the pupil’s self-advocacy skills as he understands and articulates the classroom challenges and the support he requires.

Page 33

33 
Case Study 1 
Perth Primary and Secondary School – Supporting Learners with English as an Additional Language 
The EAL service has supported both a Primary school and Secondary school in Perth city in the transition of a refugee family into the authority.
The family were originally from Ukrainian and moved to Perth from another local authority, where they had spent several months following moving to Scotland
as refugees. The children ranged in age from 8 to 17, they were care-experienced and had experienced significant trauma, both during and before the war in
their home country.  They also had a range of additional support needs. However, limited information about past experiences and the children’s needs had
been shared by the family. The children left behind a close group of friends, familiar teachers and support network that they had built up in their initial months
in Scotland when they moved to Perth.
The transition to Perth was carefully planned with a range of services, including housing, health, social work and education. Meetings with previous schools
were organised, providing clear information about initial assessments and progress made in school and support strategies which had been helpful.
Before the move to Perth, a member of the EAL Service travelled to meet the family and start to build a relationship. School staff from the Perth schools and
the previous local authority met on Teams to share relevant information. Teachers from the primary and secondary schools in the other local authority also
visited the Perth schools to support the transition when the children and young people started their new schools. Uniform and welcome packs were provided to
the family for all the children. 
In school, the children and young people have been supported by pupil support assistants who speak their first language. Bilingual support in class allows the
pupils to participate with their peers. Pupils can be supported to take part in group work with their English-speaking classmates, where they are beginning to
learn the English that they need to access the curriculum. The pupil support assistants encourage friendships with other children and young people, to build a
supportive community.
A Pupil Support Teacher with EAL expertise was appointed to work with the primary school to support the children, to continue the assessment process which
had been started in their previous school, to provide specialist EAL support and to advise class teachers of appropriate strategies. There is now a much clearer
plan for these pupils. A trusting relationship is building with the family, and they are now providing more information with the school about the children, which
informs decisions and plans, leading to better outcomes.
The children attend a weekly homework club at school run by the bilingual PSA and a bilingual community learning assistant. They are encouraged to attend
events organised in the community to meet other children from their country.
The young people in high school have benefited from EAL support, and for senior pupils, access to ESOL classes in school. The bilingual community learning
assistant runs a weekly lunchtime drop- in session where the young people can ask for help and advice with school-related issues.
This was a challenging transition process for everyone involved, but the EAL team has provided additional supported to the schools to reduce language and
culture barriers, improving inclusion of the children and young people in the school community and ensuring the children and young people are attending well,
happy in school and making progress in learning, and learning English.

Page 34

34 
Case Study 2 
Oakbank Primary School – Implementation of CIRCLE across setting and P1 Enhanced Support Provision 
Oakbank Primary School has successfully implemented the use of CIRCLE across their whole school setting.  Supported by the Senior Leadership Team, staff
from Nursery to Primary 7 are familiar with and access both Up, Up and Away and CIRCLE resources to support the embedding of universal supports to make
learning environments accessible and inclusive for all children. 
Within the nursery setting ECPs identify an area they wish to focus on within the Up, Up and Away document that will be supportive to the continued development
of the inclusive environment in meeting learners needs.  ECPs carry out observations and identify what next steps will be in partnership with parents and other
staff members.  The utilisation of the parent postcards has been found to be helpful in providing a good communication tool in partnership with parents and
supporting the journey of identifying any barriers and supports needed in the future.  Nursery staff have found the format and layout very user friendly and a
useful tool in bridging this communication gap.  It has also helped to facilitate open conversations with parents around any barriers their child may be facing
and finding supports and strategies to meet the individual needs in accessing nursery.  
Within the school setting CIRCLE and Up, Up and Away are used in supporting transition from Nursery to Primary 1 for identified learners along with the looking
at and adapting the P1 learning environment to make it as accessible as they can to meet upcoming learners needs.  Across the whole school an Environmental
Audit is completed at the beginning of every year and this year Oakbank Primary School has teamed up with Inchview Primary School as part of their school’s
improvement plans to collaborate together to carry out follow up environmental observations from their environmental audit to share good practice and provide
a different external perspective.  
The impact of the embedding of Up, Up and Away and CIRCLE has provided practitioners with an opportunity to reflect on their learning environments with a
fellow peer through valuable professional dialogue sessions and set themselves targets from this to support moving forward.  Senior Leaders direct staff to the
Circle Participation Scale initially when concerns above universal offer are being raised to look at any further adjustments or adaptations needing to be made. 
They have also found it has provided a bit more autonomy for their staff especially when making those early observations, identifying a barrier and need and
seeking supports and strategies to meet that need. 
Oakbank Primary School have also been part of PKC’s P1 Enhanced Support Provision this session around two identified learners currently within their Primary
1 stage.  The P1 Enhanced Support Provision is a model designed to support identified learners who had previously been to the transition panel to look for
alternative provision, ie Intensive Support Provision Placement but was not granted.  The schools DHT has led the Early Years Team and has highlighted the
following successes and impact as well as the challenges: 
Key Successes & Impact:
School enhanced transition 
Successes:
✓ Regular meetings between nursery and P1 staff
✓ Regularly organised visits for identified children to classroom spaces as part of enhanced transition planning, ie additional visits during summer holidays
(nursery 45 week opening) and visits during in-service day

Page 35

35 
✓ Class teachers utilised RCCT to visit nursery, spend time in same space as identified children and begin initial interactions
✓ Class teachers released from class to attend child plan meetings and build awareness of all transition documentation, ie All About Me, How to help Me,
Transition Passport etc
✓ Medical Training organized and attended by all P1 staff members to support identified child
✓ ECP from nursery setting identified to support transition into P1
Impact:
✓ P1 staff team well-informed of needs and supports for identified children
✓ Information shared in variety of formats to enable P1 staff team to gain sound knowledge and understanding
✓ Children had time to become familiar with the new environment and surroundings in a supported way
✓ Children had time to become familiar with new faces and begin to develop initial relationships with key staff members, where possible
✓ Families could reinforce and support transition at home and during summer holidays, using documentation provided
✓ ECP provided familiar face for the children and supported P1 staff team with behaviours, strategies, etc
✓ ECP played vital role in settling the children into their new environment and routines which provided security for parents reducing anxiety a little
Environment
Successes:
✓ Fence built to create safe and secure space, directly accessible from P1 classrooms
✓ School changing room modified by janitor into quiet space in P1 area
✓ Fob inserted on P1 corridor
✓ Open Plan P1 class area
✓ Access to nearby toilet area for identified child to be changed
Impact:
✓ Identified children are able to engage in outdoor break and lunch and access outdoor play as part of their learning in a safe and secure environment
✓ Increased possibility of free flow play between indoor and outdoor space allowing children from both classes to access and share the activities set up in
the break-out and access a safe outdoor area and access outdoor play as part of their learning directly from their classroom
✓ Identified safe space for identified children to regulate and escape the busy and noisy P1 environment (Quiet room only accessed by 2 children, allowing
lots of flexibility and can be set up specifically to meet their needs)
✓ Identified children can explore, investigate and utilize resources, activities and play in both P1 classes
✓ Children are all becoming more familiar with one another, enhancing relationships and friendships with P1 staffing team having strong positive
relationships with all children across P1
✓ Individual toilet is near P1 area which is large enough to allow identified child to be changed by supporting adult safely
Team/Staffing

Page 36

36 
Success:
✓ School allocation of ECP from nursery to support transition and highly skilled PSA joined the P1 team, with personality and characteristics ideally
matched to our identified children and staff team and led to Collaborative approach of all members of P1 team
✓ Additional meetings with PPST, different members of support team and partner professionals, etc enhanced the collaborative process in supporting and
meeting learners needs
✓ One PSA identified for two children in different classes
✓ Support from Inclusion Teacher:
o  time taken at the start of term to clarify roles, responsibilities and expectations; fitted in really well as part of the team, from the start;
demonstrates the same desire to do the best for the children; contributions valued by members of the P1 team; recognizes the strengths of the
team and individuals within it
✓ Commitment from DHT:
o dedicated to do best for children and P1 team; clarification of roles, responsibilities and expectations of each member of P1 support package;
communicating with various partner professionals; support to build collaborative team in P1; continuous discussions and dialogue with class
teachers; regular check-ins with PSA and ECP; meetings with Outreach Teacher to clarify roles and responsibilities and plan effectively in order
to best support team and children; hands on support during breaks and lunches; dedicated time to support P1 team and children; communication
with parents and recent review of transition and term 1; continual problem solving with team
✓ Access to expertise support and advice from a range of partner professionals 
Impact:
✓ ECP has played a vital role in the positive transition and progress for the children and families in providing huge support for class teacher and staff
working in P1, provided familiar face and approach for children as they transitioned into P1 and provided element of security and reassurance for parents
and brought essential prior knowledge and understanding of the children to the team as well as knowledge of playbased pedagogy.
✓ PSA became part of the P1 team and had an immediate positive response from identified children which supported their responsiveness to their needs
and developed a strong, positive relationships with identified children, especially with one in particular supporting children settling in well to P1
environment and routines
✓ Initial learning routines were established and implemented where appropriate and possible and thus progress of identified children was made possible
✓ Inclusion Teacher support really helped to ensure all P1 team members had a shared understanding and they fitted into the team really well showing
commitment to doing the best for the children and team.  This played a key role in the support by sharing expertise, ideas and strategies, signposting
when necessary and making a really positive impact to the supports in place. Genuine partnership/collaborative working building positive and supportive
relationships as a team was formed.
✓ DHT support meant a really successful and supportive team around the children leading to Staff members were well-informed where possible and were
fully part of decision making, problem solving, etc.  All members of the team were made to feel welcome and highly valued and ensured roles and
responsibilities were clear and understood and if not able to discuss, share and resolve

Page 37

37 
✓ Parents were kept informed and part of the children’s educational journey
Highlighted Challenges were as follows:
• Staff allocation timings meant that the full Team Around the Child was not in place until after the summer holidays which meant that key training and
enhanced transition opportunities were missed
• Staff training was delivered on the August inset days meaning new staff were not part of school development days and enhanced transition for learners
• Staff numbers in being able to support learners during unstructured parts of the day, ie break and lunchtime
• Environmental factors lead to different barriers in being able to effectively support the identified P1 learners, ie only one classroom being used as part of
transition which has led to one learner always reverting back to that classroom; limited learning opportunities due to restricted space for free-flow play  
• Budget constraints meant that some planned adaptations and resourcing were not able to be in place, ie sensory room

Page 38

38 
Case Study 3 
Riverside Primary School Building Planning – Planning for Accessibility in collaboration with Senior Leadership Team and PKC ECS Central Team 
Planning Department 
During Session 2022-23 development was near completion of a new primary school merging North Muirton and Balhousie Primary Schools.  As part of the
standard process for ECS projects extensive consultation is undertaken with all appropriate stakeholders, including but not limited to, the ECS senior leadership
team, ECS central teams, and school SLT and, throughout the scoping and design phases. Feedback is incorporated where agreed by all relevant parties.  As
the project progressed these detailed designs were reviewed with relevant stakeholders for input to ensure they were fit for purpose and any necessary
amendments made.  Any required changes are made to the design when agreed. For example, at the initial consultations during scoping changes made could
be to the schedule of accommodation based on provision type and anticipated pupil numbers. At later stages it will relate to areas including landscaping and
furniture and fittings to ensure they are suitable. 
At the scoping stage of a project there is liaison with the central ECS team regarding the requirements for the project, depending on the level of provision. It
was decided that Riverside would have an ISP so the design reflected the standard requirements for that type of provision e.g. separate entrance, secure zone,
quiet rooms, snoozelen.  The provision of snack prep areas and sinks within each of the rooms is an example of one change that was made during the later
stages of the project to support the operational staffing needs of the provision which would not always allow staff to take pupils to other areas of the school for
this purpose.  Collaboration is a core part of the scoping and design process for any ECS project to ensure that a fit for purpose facility is provided for end
users. During the lifetime of a project, which is over a number of years, numerous factors can influence or impact the requirements for the project e.g.
SFT/Government requirements, staff changes within senior roles which can result in changing requirements and the evolving landscape of what a provision
needs to offer to meets its pupils needs. Ongoing collaboration and consultation is critical to ensure any necessary changes are made. 
School/Central Team 
The Central Team Leads, schools Headteacher and Business Change Teacher were involved from the start of the planning stage back in June 2020, this was
at the stage of architect drawings and provided the opportunity for views to be shared on the pre-planning of the school from this point onwards.  One aspect
that was taken on board was the inclusion of enclosed learning spaces, due to the high level of sensory difficulties the school were aware of around their

Page 39

39 
learners that would be accessing the new school as they felt open plan would not be the best fit in their meeting learners needs.  This took several discussions
and compromise resulting in 6 classes downstairs and 8 upstairs being enclosed rooms with the P1 area being semi-open plan and a further 4 classes open
plan which are not currently being used but will support meeting learners needs as the school continues their inclusive practice journey. 
Learning from Covid the school team shared that having smaller spaces to allow smaller groups in nursery would benefit and this led to more secure small
spaces within the nursery environment also being enclosed.  This has supported the high level of ASN learners currently within the nursery.  This also supported
the transitioning of learners from going from and open plan school to a closed plan school at Balhousie PS and avoiding having to transition back to an open
plan school, due to the level of challenge this would cause. 
In discussions around the school grounds, the ISP playground was changed to have their own enclosed area and the school team had influence over the
resources that were made available, there was also a further change made to have the fencing screened off to ensure supporting learners’ dignity for those
with sensory needs.  The main playground, whilst still not currently fully accessible for use was designed to support sensory needs, i.e. for movement breaks
facilitation as well as providing experiences for learners they have not experienced before, i.e. trim trail, outside stage and quiet areas. 
Throughout the process there was regular meetings with architects and the wider planning team where ideas were discussed, and school team felt they were
receptive to changes being made to meet learners needs.  School Team worked with Rachel Sims around visual hygiene and creation of natural pallet across
the school to ensure low stimulus environment and research was completed around alternative/flexible seating environments to allow not a chair per child but
different seating for children.  Fobbed doors were introduced when school was closer to completion and walk throughs were completed with the school and
planning teams to look at the school from the learner’s lens to ensure that the space would meet their learning needs.  Further additional fobs were installed to
ensure full health and safety aspects were changed and included as part of the completed walk throughs.  Similarly, another thing that was identified was the
suggestion that the GP room, Nurture room and ISP rooms had worktops that were height adjustable which was installed. 
It was felt that the collaboration between the school and planning team worked well and was a positive process.  The school team felt they were able to discuss
the why behind their change requests, which they backed with robust needs analysis of their learners and research and if original request was not possible the
planning team would come in with an alternative where feasible.

Page 40

40 
Case Study 4 
Habilitation Service  
Perth and Kinross contracts out its Habilitation Service to Guide Dogs for the Blind.  With close liaison with the VI Teachers the qualified Habilitation Specialist
supports children and young people with a visual impairment to develop personal mobility, navigation and independent living skills in school and in their local
community.  At whatever age the training is started, the overriding goal is to maximise the child or young person’s independence, opening the way in the future,
to further study, employment and an independent life. 
A secondary pupil significant with very reduced near and distance vision has ongoing habilitation support to enable to do things such as going to the shops
during school lunchtime. This is an everyday activity for his seeing peers. Habilitation focused on the skills, strategies and confidence in finding safe routes,
catching correct buses, using cash and cards, and finding and paying for items in the shops.  The pupil learned new strategies to increase his independence,
such as using a phone to take photos and enlarging them to be able to read bus numbers and road names, to use accessibility features such as speech and o
look at online train timetables, to use maps, as well as gaining the confidence and the knowledge to locate and use the intercom system at the station help point
to ask for help.     
The pupil has shared with his QTVI that he feels his life has been transformed with Habilitation.  With her knowledge of the pupil’s interests the QTVI worked
collaboratively with the Habilitation Specialist to enable the pupil to pursue his lifelong love of trains. The Habilitation Specialist supported the pupil with travel
to, and orientation around, the train station.  This year he got the bus by himself and went train spotting!