Perth And Kinross Council 
Learning And Families Committee 
11 March 2024 
PERTH AND KINROSS COMMUNITY LEARNING AND DEVELOPMENT PLAN
2021-24 - PHASE 1 UPDATE REPORT 
David Stokoe, Service Manager – Communities, Perth & Kinross Council
(Report No. 24/81) 
1. PURPOSE 
1.1 The purpose of this report is to provide the Learning and Families with an
update on Community Learning and Development (CLD) work completed in
the first phase of the current CLD Plan, running from October 2021 to March
2023. 
2. RECOMMENDATIONS 
2.1 It is recommended that Committee: 
• Notes the progress made in delivering Phase 1 of the Community
Learning and Development Plan, 
• notes areas for improvement, priorities for Phase 2 of the action plan
and arrangements for Education Scotland Progress Visits.
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background/Main Issues 
• Section 5: CLD Plan Year 1 Performance Report
• Section 6: Areas for Improvement 
• Section 7: Next Steps
• Section 8: Conclusion 
• Appendices 
4. BACKGROUND / MAIN ISSUES 
4.1  Community Learning and Development (CLD) provides individual, family and
group learning in community settings, in ways which enable and equip people
to improve their lives. 
4.2 Education Scotland holds the statutory inspection and regulatory role for CLD
in Scotland. The regulatory framework includes The Requirements for
Community Learning and Development (Scotland) Regulations 2013, the
Strategic Guidance for Community Planning Partnerships: Community

Page 2

Learning and Development (2012) and Section 2 of the Education (Scotland)
Act 1980. 
4.3 Under the 2013 Regulations, Councils must identify the CLD needs of target
individuals and groups within their Local Authority Area and prepare and
publish a 3-year CLD Plan setting out strategic aims for CLD services
delivered by all Community Planning Partners. This Plan sets out the
commitments of Perth & Kinross Council (PKC), its partners in the Community
Planning Partnership (CPP) and wider CLD agencies to deliver CLD which
enables better outcomes for all and tackles stubborn inequality.   
4.4 PKC has a statutory duty to coordinate and produce a CLD Plan which
contributes to achieving the objectives of the CPP to address inequalities. The
CLD approach is founded on working alongside people and communities to
improve their lives. It uses early intervention and prevention to address the
root causes, not just the symptoms, of inequality. It is about building strong,
resilient, influential and inclusive communities, and improving life chances for
everyone through learning, employability, personal development and active
citizenship. 
4.5 The Plan is a strategic framework for all Council CLD functions and wider
CLD delivery partners.  Within PKC CLD is delivered by a range of core teams
embedded in key services and overseen by the Stronger Communities
Leadership Group.  The group comprises of Service Managers and Senior
Team Leaders from PKC services delivering community work plus key
partners, Perth and Kinross Association of Voluntary Service (PKAVS) and
Culture Perth and Kinross (CPK). 
4.6 The CLD Plan covers the period October 2021-September 2024.  The Phase
1 Action Plan focused on the recovery and renewal of our communities
following the Covid-19 pandemic which significantly increased inequalities
faced by some of our most vulnerable adults, families and young people.  The
Plan also focused on ensuring key 3rd sector partners and community
organisations could re-build their capacity to deliver their work with
communities.  The Plan was approved by Lifelong Learning Committee in
November 2021 and can be found here - Perth and Kinross Community Learning and
Development Plan (pkc.gov.uk) 
4.7 The phase 2 Action Plan has been produced in line with the new Council
Corporate Objectives, covering the period April 2023 to March 2024. 
5. PHASE 1 PERFORMANCE REPORT 
5.1 The CLD Plan identified the following priorities as a focus for CLD activity for
Phase 1 of the Plan 2021/ 2022 - 
• Poverty (including Child, Food and Fuel Poverty) 
• Mental and physical wellbeing 
• Family Learning. 
• Employability and Adult learning.

Page 3

• Digital participation 
• Raising attainment 
• Best start.  
• Community empowerment 
5.2 Key Achievements from Phase 1 
Giving every child the best start in life 
Support for Families 
5.2.1 The Parenting and Family Learning Team delivered 96 family support
programmes, including infant massage, Home Coaching one to ones,
Incredible Years and family sessions within HMP Perth, which resulted in- 
• 64% increase in the number of male carers receiving support.
• 9 Gypsy Traveller families engaging in support using Starter Sacks
which contain a range of materials and activities to encourage child
centred play at home and to involve parents in their children’s learning.
• Additional support to Romanian families with very little English to help
complete the Basic Incredible Years programme.
These programmes provide parents with both the skills and confidence to
support their children’s development. 
5.2.2 435 children benefitted from Play Practitioners delivering a range of
programmes for schools within the playground environment, supporting
children’s health and wellbeing. 
5.2.3  The “Families Empowering Communities” project commenced in April 2021 to
support children and families in Crieff and Letham.  During the summer of
2021 the project delivered family activities to 355 children from Letham and
engaged 121 families in outdoor sport activities and arts and craft sessions. 
The project also facilitated Place Standard Conversations with 200 children
from Crieff and Letham to help shape new service provision leading to 
• 29 children participating in two 8-week wellbeing programmes designed 
by their peers.
• 12 children designed and participated in a John Muir Discovery Award
programme.  The John Muir Discovery award is an environmental award,
enabling families to discover areas in their local community using a
treasure hunt theme, develop numeracy and literacy skills and share a
family picnic together.
• 44 families signed up for the John Muir Family packs, enabling families
to complete the award at a time and pace that suited their needs,
developing their confidence and skills. The award encouraged families to
share what they had learnt through building a photo montage of their
experiences and learning.

Page 4

Childrens Rights 
5.2.4 April 2021 saw the introduction of a children’s rights advocacy service 
to address and minimise the impact of Covid 19 on children and young
people. Services for Young People Children’s Rights Officer supported
children and young people at a variety of meetings, including child protection
case conferences, core group meetings, looked after care reviews and young
person’s planning meetings.  Over 30 children and young people were
supported to be actively involved in making decisions about their care plans. 
5.2.5 Services for Young People Children's Rights Officer supported 12 schools to 
achieve bronze level Rights Respecting Schools status and 13 schools have 
progressed to silver status with 3 have progressing to gold.  This helps to
ensure that the voices of children and young people are heard and their rights
respected. 
Developing educated, responsible and informed citizens 
Achievement Awards 
5.3.1 534 young people were supported to achieve a variety of youthwork awards, 
with 43 young people attending an awards ceremony at Holyrood Palace to
receive their Duke of Edinburgh Gold Award.  These awards help young
people develop their wider skills and confidence outside formal education. 
5.3.2 80 young people volunteered to support delivery of extracurricular school
sport and physical Activity as part of the Active Schools Programme.  3 young
people achieved an SQA qualification in Sports and Dance Leaders and 21
achieved a Scottish Governing Body Coaching/Officiating Qualification.  This
supports both the development of positive health and wellbeing in young
people and gives them new skills and confidence outside of formal education. 
Support for Young People 
5.3.3 Perth and Kinross Council Services for Young People developed a series of
Health & Wellbeing courses. These were attended by 18 young people with
an additional 6 care experienced young people accessing 1-1 counselling
sessions and 4 young people accessing a series of art sessions.  This helped
support the wellbeing of these young people. 
5.3.4 Perth and Kinross Services for Young People Bail supervision programme
engaged 73 young people aged 16- 25 (up to the age of 26 for care leavers)
to reduce reoffending. This work is delivered in partnership with Criminal
Justice, Scottish Courts and other relevant organisations. A number of young
people were provided with an intensive support package whilst other young
people at risk of offending engaged in diversionary activities.

Page 5

Developing a prosperous, inclusive and sustainable economy 
Supporting Young People into Employment 
5.4.1 Services for Young People supported 47 young people on Activity
Agreements.  Activity Agreements' help school leavers gain skills and
confidence and plans are developed to help young people prepare for
employment, training, education and/or volunteering. The young person must
be aged 16 to 19 years old, not be in a job, education or training. They receive
support from an Activity Agreement key worker and work on an individual plan
to help you reach their goals.  Their agreement could include music, arts,
sport or outdoor activities. They can also take part in group activities with
other local participants and get involved in community projects. 39 young
people entered positive destinations, included, higher education, employment
in the care sector, retail, landscaping, hairdressing, hospitality and mechanics.
5.4.2  Services for Young People also worked with local businesses to develop
sector-based skills academies in construction, outdoor education and care. 10
young people gained valuable skills in each of these sectors. 
Adult Learning 
5.4.3 1049 adult learners achieved their learning outcomes, including SQA
qualifications in Communication and Numeracy, Food Hygiene, Employability,
Life skills and English for Speakers of other Languages (ESOL).  During
Phase 1 of the plan delivery of classes shifted from being entirely online to a
mix of face to face and on-line learning, allowing engagement with more
learners in a variety of settings.  This helped learners progress into
employment, further education or volunteering.
5.4.4  726 community volunteers received upskilling training using the PKC
Volunteer Upskilling Fund.  Skills developed included First Aid, Food Hygiene,
Sports Coaching qualifications, mental health awareness training and MIDAS
training for minibus drivers.  This helped develop the capacity of community
groups, as well as providing individuals with new skills and confidence. 
5.4.5 Housing’s digital inclusion project delivered a range of tailored approaches for 
Tenants, enabling them to access information and financial support online. It
also provided those who were digitally excluded access to devices and the
internet. To date, over 100 tenants have been supported through the project.   
Supporting people to lead independent, healthy and active lives 
Homelessness 
5.5.1 Church Action for the Homeless (CATH) developed activities to support
people at risk of homelessness to increase their confidence and self-esteem. 
Activities included a walking group, outdoor activities at Willowgate Centre
and a fitness group.

Page 6

Community Food 
5.5.2 35 Community Food projects were supported to develop their capacity and  
establish local food networks meaning communities are better able to address
issues of food insecurity through building cooking skills, raising ability to
access good quality food and increase information available regarding cash
first approaches. 
Older People 
5.5.3 The Wellbeing project for older people delivered by Housing Services worked
with over 50 socially isolated older people in Perth city and Invergowrie to
provide them with 1-1 support and set up local lunch clubs.  The project is
currently working with a local primary school to develop an intergenerational
garden at a local allotment site. 
5.5.4 Support for those Seeking Asylum and Refugees 
CLD functions and partners provided a wide range of activities and support to
individuals displaced from the Ukraine, in addition to the individual’s seeking
asylum and housed in the Station and Queens Hotels in Perth.  Activities have
included free gym membership with Live Active Leisure, provision of bikes
from Perth Bike Station and ESOL classes from Crossing Borders, PKAVS,
PKC and Perth College.  This support has continued and been refined as we
better understand the needs of these groups. 
Creating a safe and sustainable place for future generations 
5.6.1 136 environmental improvement groups were supported to help maintain the
core path network, open spaces and carry out local litter picks. Annual funding
was provided to bloom groups to help them improve the appearance of their
towns and villages by public displays of flowers and plants. 
5.6.2 The tenant led Housing’s Estate Based Initiatives Project allowed tenants to
identify specific projects which they felt would improve the community where
they lived, with a particular focus on the environment and safety.  In the
reporting period 77 projects were identified throughout Perth and Kinross with
a total spend of £189K. 
6. AREAS FOR IMPROVEMENT 
6.1.1 Developing a joined-up approach to promoting and supporting volunteering
across Perth and Kinross has not yet been possible due of changes within
PKAVS, however discussions have been progressing. This work will be
completed in Phase 2 of the Action plan with the launch of a new volunteering
website. 
6.1.2 The Integration of employability support programmes and adult learning to
provide wrap around support has not progressed as quickly as we would have

Page 7

wished.  The Economic Development Senior Project Officer with responsibility
for employability programmes has joined the Stronger Communities
Leadership Group and has provided an overview of opportunities across Perth
and Kinross.  Support programmes are also being introduced alongside
locality working, such as Letham and the opening of the Hub. 
6.1.3 A Participatory Budgeting (PB) project to commission 3rd sector groups to
provide health and wellbeing projects did not take place due to changes to the
allocated budget, which was repurposed to pilot Community Circles.  There
was also little overall progress towards the PKC 1% PB budget allocation in
Phase 1 of the Plan.  Phase 2 of the plan will see increased PB activity with
the Local Action Partnerships leading a Climate Change and Cost of Living
Project. 
6.1.4 Development of a Parent’s Network has been delayed.  The aim was to
deliver shared interest sessions that enabled parents, carers and service
providers to come together to share and develop thinking that can inform
service developments and planning.  To be progressed in Phase 2 of the plan. 
7. NEXT STEPS 
7.1 Transformation and Locality Working 
7.1.1 A review of how PKC engages with communities has taken place as part of
the Council’s Transformation programme.  This review looked at the methods
PKC uses to consult communities, localised decision-making structures and
access to PKC grant programmes.  The outcomes from this work will support
CLD functions to more effectively support those in most need. Ensuring they
are able to engage with local decision-making forums, have access to funding
and resources and are supported to play an active part in their communities. 
The PKC leadership restructure will further support this approach, with CLD
functions combined within the Economy, Place and Learning Directorate. 
7.1.2 PKC with support from Community Planning Partners has been piloting
approaches to locality working in Letham, Highland Perthshire and Coupar
Angus.  Preparatory work has also begun in Crieff.  Locality working will- 
• Build stronger relationships between services, partners and
communities.
• Consider new ways to deliver services which are joined up, flexible and
responsive to the needs of communities, based on feedback and
supported by evidence.
• Develop a collaborative approach with partners to co-design services
that meet needs.
• Take a focussed approach to tackle inequalities and poverty.
• Support our workforce to be empowered and make decisions and to take
forward a “no wrong door” approach.

Page 8

CLD functions will be integral to the successful delivery of locality working,
providing a valuable insight into the needs and assets of communities, as well
as being able to work with 3rd sector groups to deliver a wide range of
programmes.   
7.2 Priorities for Phase 2 Action Plan  
The Phase 2 Action Plan will continue to deliver against the priorities of the
CLD Plan outlined in paragraph 3.1, with a particular focus on – 
• Delivering play activities for children and families.
• Establishing an Additional Support Needs Parents Network to support
delivery of ‘shared interest’ sessions that facilitate good communication
with parents, carers and service providers.
• Providing ESOL provision to refugees and people seeking asylum.
• Developing digital skills in young people and adults to allow them to
access on-line support services and develop skills for employment.
• Delivering community cook-it classes across Perth and Kinross to
improve people’s skills and confidence for cooking on a budget.
• Developing a clear volunteer offer to people interested in volunteering.
• Delivering a Participatory Budgeting programme to support community
groups to address climate change and the cost-of-living crisis.
• Assessing and understand the needs of older people in Perth and
Kinross for actions in year 3 of the CLD Action Plan and implementing
“Age Friendly Communities.” 
7.3 Self- Evaluation 
As part of the process of continual self-improvement all Council and partner 
CLD functions are completing a self-evaluation exercise to assess how well
they are collectively performing against key indicators from the Education
Scotland Inspection Framework, “How Good is our Community Learning and
Development?”  These indicators relate to – 
• How data is used to shape provision
• Impact of delivery on those we work with
• Governance and leadership of CLD 
The self-evaluation document will be a key part of our evidence in the
Education Scotland Progress Visit scheduled to take place in the next 6
months.  The Progress Visit will assess delivery of the CLD Plan 2021-24 and
the shaping of Phase 2 priorities, including work delivered by Community
Planning Partners.  As part of the Progress Visits CLD functions and Partners
will be required by Education Scotland to present evidence of progress and
delivery against the quality indicators listed above and provide opportunities
for the inspection team to observe and speak to learners, community groups
and partner organisations.

Page 9

8. CONCLUSION   
8.1 This report sets out progress made in delivering Phase 1 of the Statutory
Community Learning and Development Plan, areas for improvement, priorities
for Phase 2 and arrangements for Education Scotland Progress Visits. 
Committee is asked to – 
i. Note the progress made in delivering year 1 of the CLD Plan.
ii. Note priorities for phase 2 of the CLD Plan
iii. Note the Education Scotland Progress Visit. 
Author(s)
Name  Designation Contact Details
David Stokoe  Service Manager
Communities
dstokoe@pkc.gov.uk 
Approved 
Name Designation Date
Fiona Robertson  Head Of Service Culture
and Community
Services
1 March 2024 
Reports to be presented to a Member / Officer Group, Committee, Sub-
Committee or the Council must be signed off by the Chief Executive or the
relevant Executive Director.

Page 10

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
The undernoted table should be completed for all reports. Where the answer is ‘yes’,
the relevant section(s) should also be completed.  Where the answer is ‘no’, the
relevant section(s) should be marked ‘not available (n/a)’.  
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  n/a
Workforce n/a
Asset Management (land, property, IST) n/a
Assessments  
Equality Impact Assessment n/a
Strategic Environmental Assessment n/a
Sustainability (community, economic, environmental) n/a
Legal and Governance  n/a
Risk n/a
Consultation 
Internal  n/a
External  n/a
Communication 
Communications Plan  n/a 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 This report supports all of the priorities within the Community Plan 2022-27. 
(i) Reducing Poverty (including child poverty, fuel poverty and food poverty)
(ii) Mental and physical wellbeing
(iii) Digital participation
(iv) Skills, learning and development
(v) Employability

Page 11

Corporate Plan 
1.2 This report supports the objectives within the draft new Corporate Plan:- 
(i) Children and young people grow up safe, respected, well-educated,  
and confident in their ability to realise their full potential; 
(ii) People and businesses are increasingly able to prosper in a local 
economy which support low carbon ambitions and offers opportunities  
for all; 
(iii) People can achieve their best physical and mental health and have 
access to quality care and support when they need it; 
(iv) Communities are resilient and physically, digital and socially    
connected; 
(v) Perth and Kinross is a safe and vibrant place, mitigating the impact of 
climate and environmental change for this and future generations. 
2. Resource Implications 
Financial 
2.1 n/a 
Workforce 
2.2 n/a 
Asset Management (land, property, IT) 
2.3 n/a 
3. Assessments 
n/a 
Equality Impact Assessment 
n/a 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
The Equality Impact Assessment undertaken in relation to this report can be
viewed clicking here.

Page 12

This section should reflect that the proposals have been considered under the
Corporate Equalities Impact Assessment process (EqIA) with the following
outcome: 
(i) Assessed as not relevant for the purposes of EqIA 
Strategic Environmental Assessment 
Note – further information on Strategic Environmental Assessment is available
on eric  
3.2 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
This section should reflect that the proposals have been considered under the
Act and [choose appropriate statement]: 
Option 1 However, no action is required as the Act does not apply to the
matters presented in this report.  This is because the Committee
are requested to note the contents of the report only and the
Committee are not being requested to approve, adopt or agree
to an action or to set the framework for future decisions. 
Sustainability 
Note – further information on Sustainable Development is available on eric 
3.3 n/a 
Legal and Governance 
3.4 n/a 
Risk 
3.6 n/a 
4. Consultation 
Internal 
4.1 Community Learning and Development Leadership Group 
External 
4.2 n/a

Page 13

5. Communication 
5.1 n/a 
2. BACKGROUND PAPERS 
Community Learning and Development Strategy
Phase 1 Action Plan
Phase 1 Performance Framework