The Scottish Government on Behalf of Aecom Limited (on Behalf of Rwe Renewables UK Onshore Wind Ltd): Electricity Act Section 36 Consultation Relevant to Clachaig Glen Wind Farm and Battery Storage: Approximately 20Km North of Campbeltown and 1.8Km North-East of Muasdale on the West Coast of Kintyre (Ref: 22/00613/S36)

Argyll and Bute Council · 18 January 2023
Back to Planning, Protective Services and Licensing Committee — 18 January 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Development & Economic Growth 
This report is a recommended response to the Scottish Government’s Energy Consents
and Deployment Unit (ECDU) Section 36 consultation regarding the proposed Clachaig
Glen wind farm and battery storage located approximately 20km north of Campbeltown
and 1.8km north-east of Muasdale on the west coast of the Kintyre. 
Reference No: 22/00613/S36
Applicant: The Scottish Government on behalf of AECOM Limited (on behalf of RWE
Renewables UK Onshore Wind Ltd) 
Proposal: Electricity Act Section 36 consultation relevant to Clachaig Glen wind farm and
battery storage 
Site Address: Approximately 20km north of Campbeltown and 1.8km north-east of Muasdale
on the west coast of Kintyre. 
(A) Section 36 application made up of the following elements: 
 Construction, 35 year operation and subsequent decommissioning, of 12 wind
turbines (5 with a maximum tip height of 200m, and 7 with a maximum tip height of
185m, all with a maximum rotor diameter of 155m)
 12 associated turbine transformers (maximum footprint 5m x 3m)
 Battery Storage Area (approximate area of 75m x 60m comprised of a maximum
of 27 containers not exceeding 2.6m high. The facility will be surrounded by a 2.5m
high security fence (expected up to 30 MW).
 Turbine foundations
 Crane pads
 Access tracks
 Watercourse and culvert crossings
 Passing places 
 Underground cabling
 Up to 6 borrow pits
 A temporary construction compound (to then be used for the battery storage
facility)
 Control building and substation compound
 Concrete batching plant
 Forestry felling and replanting
 Permanent Anemometer Mast (up to 110m height)
 Site access from A83 
Associated works, but which do not form part of this application, include a connection
to the grid network. Final details of the grid connection would be subject to a separate
design and consent process at a later date.
_________________________________________________________________________
(B) RECOMMENDATION: 
It is recommended that the Council as Planning Authority objects to this
proposal for the reasons detailed below, and that the Scottish Government be

Page 2

notified accordingly. Members should note that an objection from the Council
will instigate the requirement for a Public Local Inquiry to be held.
___________________________________________________________________
(C) CONSULTATIONS: 
ENERGY CONSENT UNIT RESPONSES: 
NatureScot (11th July 2022) - have advised the ECU that the nature and scale of the
proposal at this location is such, that it cannot be accommodated without significant
adverse landscape and visual effects, including cumulative effects and night time
effects. NatureScot advise that there would be no adverse effect on the integrity of the
Kintyre Goose Roosts Special Protection Area (SPA). NatureScot advise that there
would be no significant effect on wider countryside populations of golden eagle or hen
harrier in Natura Heritage Zone (NHZ) 14. 
Response to NatureScot consultation – the Applicant submitted a response to
NatureScot’s consultation advice of 11th July 2022 for further consideration. 
NatureScot (10th November 2022) – advised the ECU that they note the contents of
the ‘Response to NatureScot Consultation’. They consider that it raises points which
are not in dispute. They agree that the application raises no issues of national
importance, and they agree that there would be significant local visual impacts at some
locations. It correctly notes that the focus of NatureScot’s response to the S36
consultation is exclusively on issues within their remit, while the ‘Response’ document
also highlights wider considerations which come into Scottish Ministers’ decision-
making for cases like this. Accordingly, NatureScots advice in relation to this S36
consultation continues to be as submitted on 11th July 2022. 
Transport Scotland (TS) (25th April 2022) – advised the ECU that, further information
was required regarding: the assessment of environmental impacts; the study area; and
the abnormal loads assessment before they could provide their final response on the
EIAR. The ECU asked that the Applicant supply feedback on the information requested
by Transport Scotland. 
Response to Transport Scotland (9th September 2022) – the Applicant submitted a
response to Transport Scotland’s advice of 25th April 2022 for further consideration. 
Transport Scotland (21st November 2022) – advised the ECU that they have
considered the ‘Response to Transport Scotland’ and can confirm that they have no
objection subject to conditions in the event that consent is granted. These conditions
relate to: approval of proposed route for any abnormal loads on the trunk road and any
accommodation measure required; during delivery period of construction materials any
additional signing or temporary traffic control measures must be undertaken by a
recognised QA traffic management consultant, to be approved by Transport Scotland
before delivery commences; and Prior to commencement of deliveries to site, a
Construction Traffic Management Plan must be submitted to and approved by
Transport Scotland to ensure that general construction traffic and abnormal loads can
be transported along the trunk road network safely and efficiently. 
Marine Scotland Science (MSS) (28th March 2022) – advised the ECU that resident
brown trout populations may be present which are listed as a priority species for
conservation in the Scottish Biodiversity List and, if so, MSS recommend that a fish
population monitoring programme should be set up to monitor these fish populations
before, during and after construction. MSS also advise that the developer establishes

Page 3

a water quality monitoring programme as felling is proposed and acidification is a
known problem in the area. The water quality monitoring programme should be
integrated with the fish population monitoring programme and follow MSS generic
monitoring programmes. The developer states “yes” to a designated area, for which
fish is a qualifying feature within/or downstream of the site. MSS are unsure what
designated area the developer is referring to. MSS are satisfied that a
decommissioning and restoration plan is included in a condition, should consent be
granted for this development. 
Scottish Forestry (SF) (21st April 2022) – advised the ECU that they require
confirmation from the Applicant in respect to the UKFS and Phase 1 felling, and that
insufficient information has been supplied to enable them to fully assess the proposal
in respect to Scottish Government’s Policy on Control of Woodland Removal and
further information was requested. They also recommend a condition to secure
Compensatory Planting. 
Scottish Environment Protection Agency (SEPA) (21st April 2022) – advised the
ECU that they have reviewed the information provided and request the following 
additional information: a detailed peat depth survey -  so that it can be clearly identified
where infrastructure is to be located on deep peat > 1m and therefore where deep peat
excavations are proposed; that re-location/micro-siting is considered to reduce the
quantities of peat proposed to be excavated; and SEPA understand that 267m of
floating track is currently proposed and 5,445m of excavated track. SEPA request that
all track on deep peat > 1m; sections that are to be floated and sections that are to be
excavated are identified and floating/re-location/micro-siting are considered to reduce
the quantities of peat proposed to be excavated. In addition, SEPA request that
conditions to secure that: once agreed, the requirement for floating tracks and their
design; that the Watercourse Crossing Strategy is agreed by relevant parties including
SEPA, with amendments as required, and implemented in full; that the restoration of
56.2ha to blanket bog (secured by condition or other planning measure); and that a
Peat Management Plan is submitted, agreed by relevant parties including SEPA, and
implemented in full. 
Response to SEPA (13th September 2022) – the Applicant submitted clarification to
the ECU regarding the issues and concerns raised. SEPA considered this and sought
further clarification via the ECU on the 22nd of September 2022. The Applicant
supplied further clarification on the 27th of October 2022. 
SEPA (16th November 2022) – advised the ECU that further to their response to the
ECU of 21st April 2022. They have reviewed the additional information provided and
have no requests for further information or objection. They request that conditions to
address the following matters are attached to any grant of consent: Any areas of peat
with a depth >1m will be avoided through micro-siting wherever possible. If / where it
is not possible to avoid peat >1m, an alternative design for the crane pads, such as
floating crane pads with piles, and for other infrastructure including floating roads, will
be used wherever possible; The requirement for floating tracks and their design is
agreed by relevant parties including SEPA and implemented in full; A Finalised Peat
Balance, to accommodate the detailed ground investigation and final design, with
confirmation of the final volume of any waste peat, to be agreed prior to the
commencement of development in consultation with SEPA and implemented in full;
The Watercourse Crossing Strategy is agreed by relevant parties including SEPA, with
amendments as required, and implemented in full; Method statements for borrow pit
restoration incorporating principles based on best practice guidance including SR &
SEPA (2012), SNH & FCS (2010), SEPA (2017) and Scottish Government (2017) to
be implemented including: ─ All peat and soil sourced from the borrow pits should be

Page 4

replaced within the same borrow pit, where possible; Restoration activities should be
overseen by an Ecological Clerk of Works to ensure methods are properly adhered to;
and the restoration of 56.2ha to blanket bog is agreed by relevant parties including
SEPA and implemented in full with a defined timescale. 
Historic Environment Scotland (HES) (15th June 2022) – advised the ECU that they
do not wish to object. HES consider that there would be a significant adverse impact
on the setting of the Dunan Muasdale, dun (SM3223) scheduled monument. They also
note that a minor level of adverse impact would occur on the settings of other nearby
heritage assets in their remit. They are nevertheless content that none of these impacts
are of a level that would raise issues in the national interest. 
Ironside Farrar (Environmental Consultants on behalf of Scottish Government
ECU to audit Peat Landslide Hazard Risk Assessment (PLHRA)) (17th May 2022)
– advised the ECU that the PLHRA requires minor revisions: although much of the
PLHRA is sound, one or two key elements are considered to be insufficiently robust to
support the PLHRA conclusions and minor revisions are required; areas for attention
will be advised in the review findings and may be progressed by the developer through
either an appendix to the original submission or by clarification letter. 
Response to Ironside Farrar (11th September 2022) – the Applicant prepared a
response for consideration of Ironside Farrar. 
Ironside Farrar (Environmental Consultants on behalf of Scottish Government
ECU to audit Peat Landslide Hazard Risk Assessment (PLHRA)) (22nd November
22) – advised the ECU that they have considered the Applicant’s response and the
information submitted addresses the queries raised and concludes the assessment,
no further response is required. It is noted that several actions require to be followed
through at construction stage and several points are noted for future reporting. 
BT (7th April 2022) – have advised the ECU that the proposal should not cause
interference to BT’s current and presently planned radio network and they have no
objection. 
Defence Infrastructure Organisation/ Ministry of Defence (MOD) (14th April 2022)
– advised the ECU that they have no objection subject to conditions to secure: aviation
lighting and aviation charting & safety management. 
Joint Radio Company Limited  (22nd March 2022) – advised the ECU that the
proposal is cleared with respect to radio link infrastructure operated by Scottish Hydro
(Scottish & Southern Energy) and Scotia Gas Networks, and they have no objection. 
Argyll District Salmon Fishery Board (18th May 2022) – advised the ECU that they
understand that Argyll Fisheries Trust has no site-specific information on fish
populations in the proposed area so they are keen that the developer takes measures
to fully assess fishery interests on and adjacent to the site. The developer states “no”
to the provision of a proposed monitoring programme adding that the fish survey
results indicate that a monitoring programme is not necessary and that the fish
populations at the site are shown to be “limited with no notable species.” Several
physical obstacles are likely to prevent the access of migratory fish to the watercourses
within the site. However resident brown trout populations may be present which are
listed as a priority species for conservation in the Scottish Biodiversity List and, if
present they require that a fish population monitoring programme should be
established to monitor these fish populations before, during and after construction.

Page 5

Response to Argyll District Salmon Fishery Board (7th July 2022) – The Applicant
provided the ECU with a response to the consultation advice of ADSFB. 
Argyll District Salmon Fishery Board (23rd July 2022) – have advised the ECU that
on review of the site location, they accept the Applicant’s conclusions in that 
monitoring may not be effective or appropriate in this case. 
Royal Society for the Protection of Birds Scotland (RSPB) (27th April 2022) – have
advised the ECU that they do not object to this proposal, however they advise that
turbines T1, T3 are relocated along with borrow pit BP06 to within the forestry and a
Habitat Management Plan applied to minimise the carbon impact of the development
and mitigate for biodiversity impacts. The ECU sought a response from the Applicant
on these points. 
Response to RSPB Scotland (9th September 2022) – the Applicant provided the ECU
with a response to the consultation advice of the RSPB. 
Mountaineering Scotland (25th March 2022) – have advised the ECU they have no
comment to make on the proposal. 
Scottish Water (8th May 2020) – advised the ECU they do not object and advise that
this does not confirm the proposal can be serviced. Advice is provided on: Asset Impact
Assessment; Drinking Water Protected Areas; and Surface Water. 
Glasgow Prestwick Airport (GPA) (25th April 2022)– advise the ECU that subject to
confirmation from the Airport’s APDO that the proposal will have no impact on their
published Instrument Flight Procedures (IFP’s) they are likely to have no objection.
However until such times as they have confirmation that there is no impact on their
IFP’s – the Airport must put in a holding objection until this matter is fully concluded. 
Glasgow Prestwick Airport (GPA) (18th July 2022) – Following further examination
of their Instrument Flight Procedures (IFP’s), GPA are now content that the proposal
will have no impact on published Terminal Arrival Area (TAA) minimum altitudes in the
location of the proposal. Consequently, GPA is content to remove its objection. 
National Air Traffic Services Safeguarding (NATS) (24th March 2022) – advised the
ECU that the proposal has been examined from a technical safeguarding aspect and
does not conflict with NATS safeguarding criteria. Accordingly, they have no
safeguarding objection. 
Highlands and Islands Airports Limited (HIAL) (23rd March 2022) have advised the 
ECU that their calculations show that, at the given position and height, the proposal 
would not infringe the safeguarding criteria for Campbeltown Airport. Therefore, HIAL 
has no objection. 
British Horse Society (BHS) (23rd March 2022) – provided advice to the ECU on the
importance of off-road riding and active travel and suitable infrastructure. They have
not raised any objection. 
Crown Estate Scotland (12th April 2022) – have confirmed to the ECU that the assets
of Crown Estate Scotland are not affected by this proposal and they have no
comments.

Page 6

West Kintyre Community Council (WKCC) (25th April 2022) – have advised the ECU
that they object to this proposal in respect to:  Landscape & Visual Impact; Hydrology/
Private water supplies/ Increased risk of flooding; and Tourism. 
East Kintyre Community Council (EKCC) (22nd March 2022) – advised the ECU that
they object to the proposal on the grounds of visual amenity due to cumulative harmful
visual impacts contrary to Argyll & Bute Council’s Policy LDP 6 and Proposed Local
Development Plan 2 Diagram 7; and Community Development Amenity due to the
wholesale harmful impacts to a designated Tourism development area. 
ARGYLL & BUTE COUNCIL RESPONSES 
ABC Consultant Landscape Architect (20th June 2022) – recommends that an
objection should be raised on landscape and visual grounds. There could be scope to
mitigate the effects of this proposal through a reduction in the size of turbines and
possible omission/reposition of more prominent turbines (for example Turbines 1 and
3 which are particularly prominent in views from the west). Further mitigation of visible
aviation lighting should also be considered through the installation of an Aircraft
Detection Lighting System once approved by the CAA (Civil Aviation Authority) which
would significantly reduce the duration of lighting.
ABC Area Roads (12th April 2022) – have advised that they have no objection. The
access to this site is from the A83 Tarbet - Campbeltown Trunk Road, and Transport
Scotland should be notified. 
ABC Environmental Health – it has not been possible for Environmental Health to
provide advice on this proposal. Considering this, the advice of an independent noise
consultant has been sought to review this proposal. 
ABC Noise Consultant (22nd December 2022) – have advised that good practice has
been adopted by the Applicant, with a few minor issues identified. The most significant
of these issues is the identification of several derelict buildings within 2km of the site
boundary, for which the planning status is unknown, and for which the ongoing
residential use should be established. If it remains the planning authorities wish that
these properties should remain with a residential use, then these should be reassessed
by the Applicant, including where relevant the battery storage equipment which may
become significant. As presented, the assessment relies on background noise data
from previously proposed or consented wind farms, and separate considerations are
made for the noise of the current wind farm site, and then for the cumulative situation
with all existing and consented wind farms in the local area in addition to the proposed
site. It is not entirely clear from the evidence presented whether these limits have been
correctly transposed, or that the higher value for the adopted fixed limits have been
justified. Further information on this aspect should be sought from the Applicant.
However, the size and scale of the proposals may justify the use of the higher value
fixed limit. In the absence of any new residential receptors being identified (e.g.
currently derelict properties), there are no reasons to object to the scheme on noise
grounds, but a suitably worded condition to limit the noise levels, tonality and amplitude
modulation should be applied. 
ABC Flood Risk Assessor (13th May 2022) – no objection to the proposal subject to
planning conditions to the effect of the following: watercourse crossing not to reduce
the cross-sectional area of the channel and ideally be design to convey the 1:200 year
plus climate change flow plus an allowance for freeboard; and drainage to be designed
in accordance with CIRIA C753 guidance and Sewers for Scotland 4th edition.

Page 7

ABC Flood Risk Assessor (19th December 2022) – was consulted further on the
letters of representation which raise concerns in respect to flooding. The Flood Risk
Assessor has no objection to the proposal subject to planning conditions to the effects
of the following: watercourse crossings not to reduce the cross-sectional area of the
channel and ideally be designed to convey the 1:200 year plus climate change flow
plus an allowance for freeboard; and drainage to be designed in accordance with
CIRIA C753 guidance and post-development surface water runoff should not exceed
pre-development surface water runoff. 
ABC Local Biodiversity Officer (20th April 2022) – no objection to the proposal and
has advised that the information provided is acceptable in respect to: a Construction
Environment Management Plan incorporating a Peat Management Plan, Habitat
Management Plan, culvert details, silt management, maintenance of hydrological
regime and treatment/storage of borrow pit soil/vegetation; there were no limitations
arising from COVID-19, surveys continued uninterrupted whilst adhering to COVID-19
restrictions; Blanket bog/Groundwater Dependent Terrestrial Ecosystems (GWDTE)
hydrology have been considered; and Native woodland and other habitats/species
recommended by the Local Biodiversity Officer have been considered. 
The West of Scotland Archaeology Service (WOSAS) (27th July 2022) – No
objection subject to a condition to secure the implementation of a programme of
archaeological works in accordance with a written scheme of investigation to be agreed
by the WoSAS, approved by the Planning Authority, and thereafter fully implemented
and that all recording and recovery of archaeological resources within the site is
undertaken to the satisfaction of the Planning Authority in agreement with the WoSAS. 
Please note: the above are summaries and the full consultee responses can be
viewed on the Energy Consent Unit and Argyll & Bute Council websites.
___________________________________________________________________
(C) REPRESENTATIONS: 
As the Council is not the determining Authority all letters of representation are
considered by the Energy Consents Unit. At time of writing, public representation
figures stand at 2 objections, which are published on the ECU website. The key issues
raised are summarised below: 
Material Considerations raised objection are summarised as follows: 
 Flooding Impacts (increased risk because of the development) on High Crubasdale
Farm and Bridge House, Muasdale. 
Comment: A copy of this representation was sent to the Council’s Flood Risk Assessor
for comment on 1st December 2022, to ascertain if it would alter their consultation
advice in any way. A response was received on the 19th of December 2022, which
differs slightly from the previous advice given. A requirement is now added to the
recommended conditions that post development surface water run off should not
exceed pre-development surface water run-off. 
Public Consultation – Whilst not a statutory requirement for Section 36 applications, the
Applicant has undertaken Public Consultation. Further information on this is contained in
the Pre-Application Consultation Report (October 2021) which is available on the ECU
website - ECU00002103

Page 8

Note: the comments raised above are addressed in the assessment of the proposal at
Appendix A of this report. 
Note: please note that the letters of representation above have been summarised
and that the full letters of representations are available on the Energy Consents
Units website. 
___________________________________________________________________ 
(E) SUPPORTING INFORMATION 
Has the application been the subject of: 
i) Environmental Impact Assessment Report (EIAR): Yes 
EIAR comprising:   
 Volume 1: Non-technical summary (NTS)
 Volume 2a: Main Report
 Volume 2b: Figures
 Volume 2c: Landscape & Visual Figures
 Volume 2d: Visualisations
 Volume 3: Appendices
 Volume 4: Confidential Annex 
Key matters covered in the EIAR include: Introduction; Approach to the EIA; Project
Description; Reasonable Alternatives; Summary of Consultation; Planning & Energy
Policy Context; Landscape & Visual; Noise; Ecology; Ornithology; Geology, Hydrology
& Hydrogeology; Cultural Heritage; Socio-economics, Recreation & Tourism; Traffic,
Transport & Access; Infrastructure & Telecommunications; Aviation Safeguarding;
Forestry; Shadow Flicker & Summary of Effects; and Conclusion. 
ii) An appropriate assessment under the Conservation (Natural Habitats)
Regulations 1994: NatureScot have advised the ECU that there is a likely significant
effect on the Greenland white-fronted goose feature of the Kintyre Goose Roosts SPA.
This is because the distance to turbines is within the known foraging range of the
geese. Scottish Ministers are therefore required to carry out an Appropriate
Assessment in view of the site’s conservation objectives for its qualifying interest. 
iii) A design or design/access statement:   Yes   
iv) A report on the impact of the proposed development e.g. Retail impact, transport
impact, noise impact, flood risk, drainage impact etc.: Other key documents
submitted in support include: 
 Planning Statement (PS)
 Design Statement (DS)
 Pre-application Consultation (PAC) Report
 Habitats Regulation Appraisal (HRA)

Page 9

(F) Local Development Plan (LDP) and any other material considerations over and
above those listed above which have been considered in the assessment of the
application: 
Members are asked to note in the context of the Local Development Plan (LDP) and
planning process that this application has been submitted to the Scottish Government
under Section 36 (S36) of the Electricity Act 1989. As part of the S36 application
process, the Applicant is also seeking that the Scottish Ministers issue a Direction under
Section 57 (2) of the Town and Country Planning (Scotland) Act 1997 that deemed
planning permission be granted for the proposal. In such instances, the LDP is not the
starting point for consideration of S36 applications, as Sections 25 and 37 of the Town
and Country Planning (Scotland) Act 1997 which establish the primacy of LDP policy in
decision-making, are not engaged in the deemed consent process associated with
Electricity Act applications. Nonetheless, the adopted Argyll & Bute LDP 2015 remains
an important material consideration informing the Council’s response to the proposal. 
Schedule 9 of the Electricity Act does require both the Applicant and the decision-maker
to have regard to the preservation of amenity. It requires that in the formulation of
proposals the prospective developer shall have regard to: 
(a) the desirability of preserving natural beauty, of conserving flora, fauna and geological
or physiological features of special interest and of protecting sites, buildings, and objects
of architectural, historic, or archaeological interest; and 
(b) shall do what he reasonably can to mitigate any effect which the proposals would
have on the natural beauty of the countryside or on any such flora, fauna, features, sites,
buildings, or objects. 
Similarly, it obliges the Scottish Ministers in their capacity as decision maker to have
regard to the desirability of the matters at a) and the extent to which the Applicant has
complied with the duty at b). Consideration of the proposal against both the effect of
SPP (2014) and the adopted Argyll & Bute LDP 2015 will ensure that proper
consideration is given by the Council to the extent which the proposal satisfies these
Schedule 9 duties. 
(i) List of all Development Plan Policy considerations taken into account in
assessment of the application. 
Argyll & Bute Local Development Plan (2015) 
LDP STRAT 1 – Sustainable Development
LDP DM1 – Development within the Development Management Zones
LDP 3 – Supporting the Protection, Conservation and Enhancement of our
Environment
LDP 5 – Supporting the Sustainable Growth of Our Economy 
Policy LDP 6 - Supporting the Sustainable Growth of Renewables 
LDP 8 – Supporting the Strength of Our Communities
LDP 9 – Development Setting, Layout and Design
LDP 10 – Maximising our Resources and Reducing our Consumption
LDP 11 – Improving our Connectivity and Infrastructure 
Supplementary Guidance to the Argyll & Bute Local Development Plan 2015 & 2016

Page 10

SG LDP ENV 1 – Development Impact on Habitats, Species and Our Biodiversity (i.e.
biological diversity)
SG LDP ENV 2 – Development Impact on European Sites 
SG LDP ENV 4 – Development Impact on Sites of Special Scientific Interest (SSSIs)
and National Nature Reserves 
SG LDP ENV 5 – Development Impact on Local Nature Conservation Sites (LNCS) 
SG LDP ENV 6 – Development Impact on Trees / Woodland
SG LDP ENV 7 – Water Quality and the Environment
SG LDP ENV 9 – Development Impact on Areas of Wild Land 
SG LDP ENV 11 – Protection of Soil and Peat Resources
SG LDP ENV 12 – Development Impact on National Scenic Areas (NSAs) 
SG LDP ENV 13 – Development Impact on Areas of Panoramic Quality (APQs)
SG LDP ENV 14 –Landscape
SG LDP ENV 15 –Development Impact on Historic Gardens and Designed
Landscapes 
SG LDP ENV 16(a) – Development Impact on Listed Buildings 
SG LDP ENV 19 – Development Impact on Scheduled Monuments 
SG LDP ENV 20 – Development Impact on Sites of Archaeological Importance
SG LDP MIN 2 – Mineral Extraction 
SG LDP PG 1 – Planning Gain
SG LDP BAD 1 – Bad Neighbour Development
SG LDP Sustainable - Sustainable Siting and Design Principles 
SG LDP SERV 1 – Private Sewage Treatment Plants and Wastewater (i.e. drainage)
Systems 
SG LDP SERV 2 – Incorporation of Natural Features / Sustainable Systems (SUDS) 
SG LDP SERV 3 – Drainage Impact Assessment (DIA) 
SG LDP SERV 5 – Waste Related Development and Waste Management 
SG LDP SERV 5(b) – Provision of Waste Storage and Collection Facilities within New
Development 
SG LDP SERV 6 – Private Water Supplies and Water Conservation
SG LDP SERV 7 – Flooding and Land Erosion – The Risk Framework for Development
SG LDP TRAN 1 – Access to the Outdoors
SG LDP TRAN 2 - Development and Public Transport Accessibility
SG LDP TRAN 4 – New and Existing, Public Roads and Private Access Regimes
SG LDP TRAN 6 –Vehicle Parking Provision 
SG LDP TRAN 7 –Safeguarding of Airports
SG LDP REC/COM 1 - Safeguarding and Promotion of Sport, Leisure, Recreation,
Open Space and Key Rural Services 
Supplementary Guidance 2 (December 2016) 
Spatial Framework Guidance 
Supplementary Guidance 2 – Wind farm map 1
Supplementary Guidance 2 – Wind farm map 2 
Note: The above supplementary guidance has been approved by the Scottish
Government. It therefore constitutes adopted policy and the Full Policies are
available to view on the Council’s Web Site at www.argyll-bute.gov.uk 
(ii) List of other material planning considerations taken into account in the
assessment of the application, having due regard to Annex A. 
 National Planning Framework for Scotland 3, NPF3

Page 11

 Revised Draft National Planning Framework 4, NPF4 (November 2021) 
The policies in the revised draft NPF4 most relevant to this proposal include: 
• Policy 1 – Tackling the climate and nature crisis
• Policy 2 – Climate mitigation and adaptation
• Policy 3 – Biodiversity
• Policy 4 – Natural places
• Policy 5 – Soils
• Policy 6 -Forestry, woodland, and trees
• Policy 7 – Historic assets and places
• Policy 11 – Energy
• Policy 13 – Sustainable transport
• Policy 22 – Flood risk and water management 
• Policy 23 – Health and safety
• Policy 25 – Community wealth benefits
• Policy 33 – Minerals 
 Scottish Planning Policy (SPP) (June 2014)
 Argyll & Bute Landscape Wind Energy Capacity Study (2017)
 Climate Change (Emissions Reduction Targets) (Scotland) Act 2019
 Scottish Energy Strategy, December 2017
 Onshore Wind Policy Statement, Scottish Government (December 2022)
 Historic Environment Policy for Scotland (HEPS, 2019)
 The Scottish Government’s Policy on ‘Control of Woodland Removal’ (Forestry
Commission Scotland 2009) 
 Siting and Designing Wind Farms in the Landscape, SNH  (August 2017)
 Guidance for Landscape and Visual Impact Assessment, 3rd Edition, Landscape
Institute, and Institute of Environmental Management & Assessment, (2013);
 Onshore Wind Turbines: Planning Advice, Scottish Government (May 2014). 
 PAN 1/2011: ‘Planning and Noise’ (March 2011)
 PAN 60 – Planning for Natural Heritage (Jan 2008)
 Scottish Government Good Practice Principles for Shared Ownership and
Community Benefit of Onshore Renewable Energy Developments; 
 Views of statutory and other consultees;
 Planning history of the site
 Legitimate public concern or support expressed on relevant planning matters 
 Argyll & Bute proposed Local Development Plan 2 (pLDP2) (November 2019) –
The unchallenged policies and proposals within pLDP2 may be afforded significant
material weighting in the determination of planning applications at this time as the
settled and unopposed view of the Council. Elements of the pLDP2 which have
been identified as being subject to unresolved objections still require to be subject
of Examination by a Scottish Government appointed Reporter and cannot be
afforded significant material weighting at this time. The provisions of pLDP2 that
may be afforded significant weighting in the determination of this application are
listed below: 
 Policy 14 – Bad Neighbour Development
 Policy 19 – Schedule Monuments
 Policy 35 – Design of New and Existing, Public Roads and Private Access
Regimes

Page 12

 Policy 36 – New Private Accesses
 Policy 37 – Development Utilising an Existing Private Access or Existing Private
Road
 Policy 38 – Construction Standards for Public Roads
 Policy 39 – Construction Standards for Private Access
 Policy 40 – Vehicle Parking Provision
 Policy 43 – Safeguarding of Aerodromes
 Policy 58 – Private Water Supplies and Water Conservation
 Policy 63 – Waste Related Development and Waste Management
 Policy 76 – Development Impact on Local Nature Conservation Sites (LNCS)
___________________________________________________________________ 
(G) Does the Council have an interest in the site: No 
(H) Is the proposal consistent with the Local Development Plan: No
___________________________________________________________________ 
Author of Report:   Arlene Knox   Date:  4th January 2023 
Reviewing Officer:   Sandra Davies  Date:  4th January 2023 
Fergus Murray 
Head of Development and Economic Growth

Page 13

RECOMMENDED REASON(S) FOR OBJECTION TO: 22/00613/S36 
1.  Landscape & Visual Impact (including cumulative) 
Argyll & Bute Council assesses development proposals with the aim of protecting conserving
and where possible enhancing the built, human, and natural environment. A development
proposal will not be supported when it does not protect, conserve or where possible enhance
the established character and local distinctiveness of the landscape in terms of its location,
scale, form, and design. Argyll & Bute Council will resist renewable energy developments
where these are not consistent with the principles of sustainable development and it has not
been adequately demonstrated that there would be no unacceptable significant adverse
landscape and visual impacts, whether individual or cumulative. 
The proposed site lies within the Upland Forest Moor Mosaic LCT identified in the Argyll &
Bute Landscape Wind Energy Capacity Study (LWECS). This landscape has some
characteristics which reduce sensitivity to large scale wind energy development including a
generally simple landform and land cover and an expansive scale. However, these uplands
already accommodate a number of operational and consented wind farms which limits scope
for further wind farm development whilst minimising effects on more sensitive landscape and
visual receptors within the Kintyre coasts, West Loch Tarbert, and the islands of Gigha and
Arran. 
This proposal would have significant adverse effects on the character of the Upland Forest
Moor Mosaic LCT. It would also significantly and adversely affect the character of the Sound
of Gigha between Gigha and Kintyre. There would be relatively limited views from the settled
east and west coasts of Kintyre but with more extensive visibility occurring across the Sound
of Gigha, Gigha and from the more sparsely settled upland area immediately surrounding the
proposed development. 
A consent for 14 turbines between 115.5m and 126.5m applies to the site. This proposal
comprises 12 turbines between 185m and 200m. The principal change between the consented
and proposed scheme is the greater degree of intrusion associated with the substantially
larger turbines now proposed on views from the Sound of Gigha and from the eastern side of
Gigha, and also in close views from a section of the Kintyre Way. The visible aviation lighting
fixed to 8 of the proposed turbines would also be likely to extend the duration of significant
adverse visual effects experienced from these same locations. In views from Gigha and the
Sound of Gigha the proposal would be significantly larger than other operational and
consented wind farms and would form a key focus in views towards the Kintyre peninsula,
detracting from the scenic character of water, settled coastal fringe and uplands. 
The potential cumulative effects of this proposal with the Sheirdrim and Narachan application-
stage wind farms are additionally of concern as together these schemes would dominate views
to the east from the north-eastern part of Gigha. Lighting of the Narachan wind farm and this
proposal could extend the duration of significant adverse cumulative effects during hours of
darkness.
Argyll & Bute Council therefore objects to this proposal on landscape and visual grounds.
There could be scope to mitigate the effects of this proposal through a reduction in the size of
turbines and possible omission/reposition of more prominent turbines (for example Turbines
1 and 3 which are particularly prominent in views from the west). Further mitigation of visible
aviation lighting should also be considered through the installation of an Aircraft Detection
Lighting System once approved by the CAA which would significantly reduce the duration of
lighting.

Page 14

Having due regard to the above it is concluded that the proposal will have significant
adverse landscape and visual impacts (including cumulative) and is therefore
inconsistent with the provisions of: SG LDP ENV 14 –Landscape; SG 2 Renewable
Energy; LDP STRAT 1 – Sustainable Development; LDP DM1 – Development within the
Development Management Zone; LDP 3 – Supporting the Protection, Conservation and
Enhancement of our Environment; Policy LDP 6 – Supporting the Sustainable Growth
of Renewables; of the Argyll & Bute Local Development Plan; SPP (2014); NPF3; Policy
4 – Natural Places and Policy 11 – Energy of Revised Draft NPF4; the Onshore Wind
Policy Statement, (2022); and guidance contained in the Argyll & Bute Landscape Wind
Energy Capacity Study 2017. 
Notes for the Energy Consents Unit 
Battery Storage – Whilst, the provision of battery storage meets the requirements of policy,
Officers are concerned that no consideration has been given to the Landscape & Visual Impact
of this battery storage facility. This is a large facility of 27 shipping containers proposed to be
located in a rural landscape. Before a decision is reached on this proposal by the ECU it is the
view of Argyll & Bute Council that the impacts of this needs to be considered. 
Noise – Argyll & Bute Council would be grateful to receive clarification from the Applicant in
respect to the points raised by the Noise Consultant on residential receptors and fixed limits.

Page 15

APPENDIX A – PLANNING LAND USE AND POLICY ASSESSMENT 
A. THE SECTION 36 CONSENTING REGIME 
In Scotland, any application to construct or operate an onshore power generating station, in
this case, a renewable energy development with an installed capacity of over 50 megawatts
(MW) requires the consent of Scottish Ministers under Section 36 of the Electricity Act 1989.
Any ministerial authorisation given would include a ‘deemed planning permission’ and in these
circumstances there is then no requirement for a planning application to be made to the
Council as Planning Authority. The Council’s role in this process is one of a consultee along
with various other consultation bodies. 
It is open to the Council to either support or object to the proposal, and to recommend
conditions it would wish to see imposed if authorisation is given by the Scottish Government.
In the event of an objection being raised by the Council, the Scottish Ministers are obliged to
convene a Public Local Inquiry (PLI) if they are minded to approve the proposal. They can
also choose to hold a PLI in other circumstances at their own discretion. Such an Inquiry would
be conducted by a Reporter(s) appointed by the Directorate for Planning and Environmental
Appeals. If consent is given, either where there has been no objection from the Council, or
where objections have been overruled following PLI, the Council as Planning Authority would
become responsible for the agreement of matters pursuant to conditions, and for the ongoing
monitoring and enforcement of such conditions. 
This report reviews the policy considerations which are applicable to this proposal and the
planning merits of the development, the views of bodies consulted by the Scottish Government
along with other consultations undertaken by the Council, and 3rd party opinion expressed to
the Scottish Government following publicity of the application by them. It recommends views
to be conveyed to the Scottish Government on behalf of the Council before a final decision is
taken on the matter. The conclusion of this report is to recommend that the Council raise an
Objection to this Section 36 consultation on Landscape & Visual Grounds for the reasons
detailed in this report. 
B. SETTLEMENT STRATEGY 
Policy LDP DM1 establishes acceptable scales of development in three different ‘zones’ or
the ‘Settlement Strategy’. In terms of the local development plan proposals map, the proposed
wind farm and access is located within the ‘Rural Opportunity Area,’ ‘Countryside Zone,’ and
the ‘Very Sensitive Countryside.’  Where the wind turbines would be located is within the
Countryside Zone and Very Sensitive Countryside. In the Very Sensitive Countryside, only
specific categories of development are supported. This however includes renewable energy
related development. In principle, policy LDP DM 1 supports renewable energy and ancillary
developments in these areas, providing they are consistent with all other Local Development
Plan Policies. Policy LDP 6: Renewable Energy provides the primary policy framework for
assessing wind farms. In this case, it is considered that it has not been demonstrated that the
scale and location of the proposal, will integrate sympathetically without giving rise to adverse
consequences in terms of landscape & visual impact (including cumulative). For the reasons
detailed below in this report, it is considered that this proposal does not satisfy Development
Plan Policy and associated guidance in respect of renewable energy development. 
Having due regard to the above it is considered that the proposal is contrary to the
provisions of LDP DM1 – Development within the Development Management Zones;
SPP; NPF 3 and Revised Draft NPF 4.

Page 16

C. SUPPORTING THE SUSTAINABLE GROWTH OF RENEWABLES 
Argyll & Bute Council is keen to ensure that Argyll & Bute continues to make a positive
contribution to meeting the Scottish Government’s targets for renewable energy generation.
These targets are important given the compelling need to reduce our carbon footprint and
reduce our reliance on fossil fuels, reinforced by the  Climate Change (Emissions Reduction
Targets) (Scotland) Act 2019. The Council will support renewable energy developments where
these are consistent with the principles of sustainable development and it can be adequately
demonstrated that there would be no unacceptable significant adverse effects. 
D. LOCATION, NATURE, AND DESIGN OF PROPOSED DEVELOPMENT 
Background 
Consented Development - In December 2019, the Applicant received permission for a 47.6
MW wind farm at the development site. This was through appeal to Scottish Ministers
(reference PPA-130-2064). This comprises 14 wind turbines: 13 with a blade tip height of up
to 126.5 metres (m) (and hub height of up to 80m); one with a blade tip height of up to 115.5m
(and hub height of up to 69m); and associated infrastructure (‘the Consented Development’). 
Proposed Development – In their Design Statement, the Applicant has advised that due to the
advancement of wind turbine technology, subsequent design modifications and significant
changes to the wider economics of onshore wind farms and other renewable technologies in
Scotland, they are now submitting this new application under Section 36 to construct and
operate a wind farm and battery storage facility with a generating capacity in excess of 50MW
on the existing site of the Consented Development. 
The site boundaries for the Consented Development and the Proposed Development are
almost identical, except for a section to the east of the site which has been excluded at the
request of Forestry Land Scotland; the access track leading from the A83 to the site has been
widened to accommodate the delivery of larger turbine components, and a larger turning circle
and turbine laydown area on the opposite (western) side of the A83 to the site. Due to these
changes, the site has decreased in size from 12.59 km2 to 12.47 km2, with the exclusion of
the area to the east being the reason for the smaller site size. 
As with the Consented Development, the access track leading from the A83 to the site will be
the sole access / egress from the site for construction, maintenance, and decommissioning. 
The Proposed Development comprises 12 wind turbines (two less than the Consented
Development) and seeks an increased operational period of 35 years (the operational period
is 25 years for the Consented Development). The Proposed Development additionally
includes a battery storage facility with an expected upper capacity of 30 MW that was not part
of the Consented Development. 
Five of the turbines within the development would have a maximum blade tip height of 200m,
whilst the remaining seven would have a maximum tip height of 185m. All would have a
maximum rotor diameter of 155m. 
Planning History - Apart from the Consented Development, there is no previous planning
permission granted for development within the site, except for the temporary anemometer
mast which has been erected by the Applicant. FLS currently have permitted development
rights over the site for their forestry operations. 
The site - is located approximately 20km to the north of Campbeltown, 1.8km northeast of
Muasdale and 3.7km southeast of Tayinloan. The A83 between Lochgilphead and

Page 17

Campbeltown is located approximately 1km to the west. Access to the site will be taken from
the Killean Estate junction with the A83, with the access following the existing Cross-Kintyre
Timber Haul Route to the east, then to the south to the site entrance using the existing forestry
track. This is the same access as the Consented Development. The access track between the
A83 and the site is approximately 6km in length. 
Most of the site is currently forested and managed by FLS for timber production, except for
the higher land on the eastern boundary. The crop is in various stages of growth across the
site with forestry operations currently ongoing. The higher ground in the east includes some
open ground that has not been planted. This is an area of high annual rainfall, as evidenced
by the blanket peats and peaty topsoils which are apparent in undisturbed open ground areas.
Flatter areas on the highest ground within the site thus support wet blanket peats, with
associated mire vegetation. Forms of wet heath occur on the more steeply sloping valley sides,
where peat would be expected to be shallower. The western part of the survey area includes
a range of grasslands. These become progressively more productive and agriculturally
improved towards the west of the area, where the ground is lower. 
The southern part of the site maintains height from the main eastern ridge, with a height in this
southerly area of up to 250m Above Ordnance Datum (AOD). From this ridge the ground falls
steeply to 140m AOD in a valley with a watercourse, Clachaig Water, before rising to approx.
240m AOD to the North West of the site. Clachaig Water continues west out of the site where
it eventually meets the sea. The site contains three small lochs in the east and south: Loch
Na Creige, Loch Mor and Dubh Loch. Loch Na Naich is located outside of the site to the
immediate northeast. 
There are several residential properties located within 3km of the site, including several
isolated properties located adjacent to the west of the A83 associated with the small
settlements of Muasdale, Beacharr and Glenbarr. The nearest residential property is High
Clachaig, which is located approximately 1.2km west-southwest of the closest turbine (T14).
It should be noted that under the Consented Development, the residential property of High
Clachaig was located approximately 850m from the nearest turbine (Turbine T12); but as this
turbine has now been removed it has resulted in an increased distance between residential
properties and turbine locations. 
The Kintyre Way Long Distance Route follows the access track for the proposal from the A83
until it is approximately 560m to the north of the site, where the Kintyre Way then heads
eastwards and the wind farm access heads south. At its closest point, the Kintyre Way passes
approximately 230m from the north eastern point of the site and 1km from the nearest turbine
(T02). 
Proposal   
Wind Turbines - The proposal comprises up to 12 turbines, with two different heights. 7
turbines with a blade tip height of 185m, and 5 with a blade tip height of 200m. All turbines will
have a maximum rotor diameter of 155m. Each turbine will have a 50m micro-siting tolerance.
Aviation lighting – 8 turbines will require visible-red and 8 will require infra-red hub mounted
obstruction lights. 
Wind Turbine Foundations – 12 turbine foundations with a 22m diameter (380m2). The depth
cannot be confirmed until after the ground investigation is completed (post consent). Each
foundation to have a 50m micro-siting tolerance. 
Turbine Crane Pads – 1 main crane pad and 3 assembly crane pads per turbine. Dimensions
per main crane pad: 40m x 35m (1962.5m2). Dimensions of assembly crane pads per turbine:
114m2, 171m2 and 203m2. Each crane pad will have a 50m micro-siting tolerance.

Page 18

Permanent Anemometer Mast - 50m micro-siting allowance. Up to 110m high permanent wind
monitoring mast (steel lattice structure), Foundation: Approximately 20m2 and Crane
hardstanding: Approximately 20m x 20m. 
Control Building and Substation Compound - 100m micro-siting allowance. Compound
dimensions: 100m x 50m (footprint: 5,000m2), Control building height: Up to 5.5m, and
maximum height of substation: Up to 10m. 
Temporary Construction Compound and Battery Storage Facility – will have 100m micro-siting
allowance. Approximate dimensions 135m x 75m, giving a compound area of 10,125m2. Its
use will be temporary as a construction compound, thereafter it is to be used to house battery
storage. 
Battery Storage – expected upper capacity of 30MW (with total generation of wind turbines
and battery storage expected to have a capacity of around 90MW, but less than 100MW). It is
to be installed in part of the construction compound (approximate area of 75m x 60m) on
completion of most of the construction works. It shall consist of 27 containers not exceeding
2.6m high. 
Site Access Track – from the A83 to the main site 6km of upgraded existing track. Main
development site length 11km (comprising 8.9km new track and 2.1km upgraded existing
track). It will be 5m wide (wider at bends) and will have a 100m micro-siting tolerance due to
forested conditions preventing detailed ground investigations until nearer construction. 
Passing Places - A total of 12 new passing places will be required between the A83 and the
main site. A total of 7 of these will be in the main site. Up to 12 cross places may also be
required for forestry operations to continue during the construction works for the proposal,
these will be designed as small passing places and their location will be confirmed prior to
construction. 
Watercourse & Culvert Crossings – 6 watercourse crossing points are proposed including: 4
new crossings and alterations to 2 existing crossings. 
Borrow Pits (Temporary Quarries) – up to 6 borrow pits are proposed. These will have short
tracks to link them to the main access track and 100m micro-siting tolerance. 
Cabling – Approximately 10km of underground cabling will be required. These will be installed
along site access tracks, as far as practicable. 
Forestry – the area to be felled for the proposed development and peatland restoration is
102.32ha. The total restock, including 56.2ha of peatland restoration is 83.73ha. 
Infrastructure 
Water and Foul Drainage – Scottish Water has advised the ECU they have no objection, but,
that this does not confirm that the proposal can be serviced. 
Asset Impact Assessment – Scottish Water has advised the ECU that according to their
records, the proposal impacts on existing and abandoned Scottish Water assets. The
Applicant must identify any potential conflicts with these assets and contact Scottish Waters
Asset Impact Team to apply for a diversion. The Applicant should be aware that any conflict
with assets identified may be subject to restrictions on proximity of construction.

Page 19

Drinking Water Protected Areas – Scottish Water has advised the ECU that the proposal lies
within the disused Scottish Water drinking water source catchments of the Clachaig Water
(Muasdale), Barr Water and Carradale Water. As these are no longer used for public water
supply Scottish Water has no concerns in relation to drinking water supply or quality of these
catchments. The Carradale and Saddell boreholes are also located within the wider area. The
Saddell boreholes are approx. 10km south-east of the site and will not be affected by the
proposal. The north-eastern tip of the site encroaches into the uppermost part of the catchment
of the Drochaid Burn which is a tributary of the Carradale Water. As there does not appear to
be any development planned for this area, the risk to the Carradale Boreholes is low. 
Surface Water - Scottish Water has advised the ECU that for reasons of sustainability and to
protect their customers from potential future sewer flooding, they will not accept any surface
water connections into their combined sewer system. 
Grid Network - The grid connection does not form part of the S36 application. Final details of
the grid connection would be subject to a separate design and consent process at a later date. 
E. SPATIAL FRAMEWORK FOR WIND FARMS 
SPP requires that planning authorities set out in the Development Plan a Spatial Framework
identifying those areas that are likely to be most appropriate for onshore wind farms. In terms
of the Council’s Spatial Framework guidance for wind farms (contained within Supplementary
Guidance 2: Wind Farm Map 1 and Map 2) the site is within Group 2 and 3 areas. It is partly
within a Group 2 area due to the presence of deep peat. This was considered in the Report to
Scottish Ministers published by the Scottish Government Reporters in their determination of
the Appeal for the Consented Development. This report concluded that all parties agreed that
the Consented Development addressed the requirements of deep peat and so there was no
spatial reason why the site could not be considered as if within a Group 3 area. In Group 2:
Areas of significant protection – wind farms may be appropriate in some circumstances.
Further consideration will be required to demonstrate that any significant effects on the
qualities of these areas can be substantially overcome by siting, design, or other mitigation.
Group 3: Areas are likely to be acceptable, subject to detailed consideration against identified
policy criteria. 
F. NET ECONOMIC IMPACT, INCLUDING LOCAL AND COMMUNITY SOCIO-ECONOMIC
BENEFITS SUCH AS EMPLOYMENT, ASSOCIATED BUSINESS AND SUPPLY CHAIN
OPPORTUNITIES 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewables and
SPP require applications for renewable energy developments to be assessed against net
economic impact, including local and community socio-economic benefits such as
employment, associated business and supply chain opportunities. 
During construction, the proposal would have a beneficial effect on the local economy, which
would arise because of job creation and local expenditure by the developer and contractors.
Workers involved with the project would stay locally (i.e. in hotels and other accommodation),
use local services and spend in local restaurants and shops. Given that only a small number
of businesses will be impacted for a brief period of time, the significance of effect on the local
economy is assessed to be Minor Beneficial in the EIAR. 
The construction of the proposal will create jobs, which has the potential to impact on the local
job market. The total employment generated during construction is predicted to be between
12.5 FTE and 18.75 FTE based on a 12-to-18-month construction period, the exact proportion
of which would be local is uncertain and given the nature of wind farm development, there will
be several specialised roles. As the number of local jobs available is low and short-term in

Page 20

nature, the magnitude of the construction job creation is considered to be Low. The
significance of effect on the local job market is therefore likely to be Minor Beneficial. The
socio-economic impacts associated with the decommissioning phase are likely to be similar
to those during construction. 
High Clachaig Forest covers most of the site and is managed by FLS for timber production.
The forest has some economic value and low social value. As a socio-economic receptor,
High Clachaig Forest is therefore considered to have low sensitivity to change. FLS are in the
process of producing the Carradale Land Management Plan, which includes a future felling
and replanting plan for High Clachaig Forest and the site. The most up-to-date version of this
Plan has been used to assess the impacts of the proposal on High Clachaig Forest. As FLS
and the Applicant have worked together to ensure the proposal does not have a significant
effect on FLS’ felling and restocking plans, the Carradale Land Management Plan includes
the proposal, with Phase 1 felling (2022 to 2026) including most of the area needed for wind
farm construction. There would be some additional felling to accommodate the construction of
the wind farm (26.5 ha), however this area is currently planned to be felled at a later date and
so this 26.5 ha does not relate to any forestry which is not planned to be felled by FLS. The
magnitude of change in terms of reduced amenity and restricted access associated with tree
removal for the proposal is therefore Negligible, as the area to be felled for the construction is
being conducted by FLS as part of normal forestry operations. The significance of effect during
the construction phase is also considered to be Negligible. 
Typically, the proposal will be operated remotely during the operational phase and will only
require irregular maintenance and repair visits to site. This would equate to at least 21.5 FTE
jobs, based on a minimum 50MW installed capacity, over a 35-year lifespan. Therefore, the
magnitude of the impact on the local job market is considered to be negligible and the
significance of effect on operational job creation is considered to be Negligible. 
As part of the Applicant’s agreement with FLS, the Applicant is offering the local community
the opportunity to invest in the proposal. Once planning permission is granted, the Applicant
will set up a new Limited Company. This entity will be called a Special Purpose Vehicle (SPV)
and will take the project forward. This will involve one or more community organisations
coming together to form the Community Vehicle. The Community Vehicle will then be able to
invest in the SPV up to a total share of 49%. If they decide not to invest to that level, then the
landowner FLS will themselves be able to invest up to a combined total, with the community,
of 49%. As FLS are a large employer in the region, this would have a secondary benefit locally.
In return for this investment, the Community Vehicle will receive shares in the SPV. The
number of shares the Community Vehicle will receive will be dependent on the funding
requirements of the SPV at that time. However, those shares will be non-voting and the
Community Vehicle will not be responsible for deciding how the SPV or the project is run or
managed. Only an appropriate ‘Community Vehicle’ will be able to invest. The criteria for what
makes an appropriate Community Vehicle eligible to invest is set out in the FLS Community
Investment on Scotland's National Forests and Land Guidelines (2019). In addition to the
operational effect of the proposal itself, it will also generate an additional local economic
benefit as a result of a community benefit payment that would be provided by the Applicant.
The total value of the community benefit payment associated with the proposal is dependent
on the eventual installed capacity. For example, with a capacity of 60MW, this would be
£300,000 per year (60MW @ £5,000 per MW), which equates to £10.5 million over the 35-
year operational period. 
Post construction, the forest will be restocked with commercial softwoods including Sitka
spruce. Areas of native broadleaved planting and the retention of open ground, particularly
focussed on peatland restoration which will be funded by the Applicant, will also form part of
the restocking proposals. The exception will be the areas immediately around the wind
turbines, battery storage facility and other infrastructure which will be maintained as open

Page 21

ground. With the operation of the proposal there will be no change to the baseline function of
the site as forest managed for commercial timber production. The significance of effect during
the operational phase on High Clachaig Forest as a socioeconomic receptor is therefore
considered to be Negligible. 
The EIAR advises that Community Benefit Funds would be made available for the local
community. Community Benefit is not however, considered to be a ‘material planning
consideration’ in the determination of planning applications. If permission were to be granted,
the negotiation of any community benefit, either directly with the local community or under the
auspices of the Council, would take place outside the application process. 
Having due regard to the above the proposals net economic impact, including local and
community socio-economic benefits such as employment, associated business and
supply chain opportunities has been assessed and it is concluded that the proposal is
consistent with the provisions of Supplementary Guidance 2 (December 2016); LDP
DM1 – Development within the Development Management Zones; LDP 3 – Supporting
the Protection, Conservation and Enhancement of our Environment; LDP 6 - Supporting
the Sustainable Growth of Renewables; SPP; NPF3; Revised Draft NPF4 and the
Onshore Wind Policy Statement in this regard. 
G. THE SCALE OF CONTRIBUTION TO RENEWABLE ENERGY GENERATION TARGETS 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against the
scale of contribution to renewable energy generation targets. 
The Scottish Government is committed to increasing the supply of renewable energy within
Scotland. The Climate Change (Emissions Reduction Targets) (Scotland) Act 2019 sets
stringent targets for Scotland. The Act sets a legally-binding “net-zero” target of all greenhouse
gases by 2045. The “net-zero” target for Scotland is five years ahead of the date set for the
whole of the UK. If approved the proposed development has the potential to produce
renewable energy and make a meaningful contribution to renewable energy generation
targets. The proposal would provide over 50 MW, with the total generation of the wind turbines
and battery storage having a currently expected capacity of 90MW, but less than 100MW. 
Having due regard to the above the proposals scale of contribution to renewable energy
generation targets has been assessed and it is concluded that the proposal is
consistent with the provisions of SG 2; LDP STRAT 1 – Sustainable Development; LDP
DM1 – Development within the Development Management Zones; LDP 3 – Supporting
the Protection, Conservation and Enhancement of our Environment; LDP 6 - Supporting
the Sustainable Growth of Renewables; SPP; NPF3; Revised Draft NPF4 and the
Onshore Wind Policy Statement in this regard. 
H. EFFECT ON GREENHOUSE GAS EMISSIONS 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against their
effect on greenhouse gas emissions. 
Commitment to the development of renewable energy has become increasingly important
since climate emergencies were declared by the Scottish Government in April 2019 and the
UK Government in May 2019. Whilst UK (and European) legislation have set the target of
achieving net zero greenhouse gas emissions by 2050, Scotland has set this target for 2045.
All of these targets demonstrate the immediacy placed on actions at a national and

Page 22

international scale. The development of renewables is recognised by the Scottish Government
as being important to the Scottish economy and there is an aim of renewable sources
generating the equivalent of 100% of Scotland’s gross annual electricity consumption. 
Onshore wind energy will be vital in achieving this ambitious target. The proposal has the
potential to prevent approximately 3.1 million tonnes of carbon dioxide (CO2) equivalent
emissions from being released into the atmosphere over the project’s 35-year lifetime
compared to a fossil fuel mix of electricity generation. This is the equivalent of the emissions
from 50,756 average houses (more than the total number of households in Argyll & Bute,
which is estimated at 42,801). If approved the proposal has the potential to produce renewable
energy and make a meaningful contribution to a net zero electricity network. 
Having due regard to the above the proposals effect on greenhouse gas emissions has
been assessed and it is concluded that the proposal is consistent with the provisions
of SG 2 Renewable Energy; LDP STRAT 1 – Sustainable Development; LDP DM1 –
Development within the Development Management Zones; LDP 3 – Supporting the
Protection, Conservation and Enhancement of our Environment; LDP 6 - Supporting
the Sustainable Growth of Renewables; SPP; NPF3; Revised Draft NPF4 and the
Onshore Wind Policy Statement in this regard. 
I. IMPACTS ON COMMUNITIES AND INDIVIDUAL DWELLINGS, INCLUDING RESIDENTIAL
AMENITY, NOISE AND SHADOW FLICKER (INCLUDING CUMULATIVE IMPACTS). 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against
impacts on communities and individual dwellings, including visual impact, residential amenity,
noise, and shadow flicker. 
Noise – It has not been possible to obtain advice from Environmental Health on Noise.
Consequently, the advice of an independent Noise Consultant has been obtained. They have
advised that good practice has been adopted by the Applicant, with a few minor issues
identified. The most significant of these issues is the identification of several derelict buildings
within 2km of the site boundary, for which the planning status is unknown, and for which the
ongoing residential use should be established. If it remains the Planning Authorities wish that
these properties should remain with a residential use, then these should be reassessed by the
Applicant, including where relevant the battery storage equipment which may become
significant. As presented, the assessment relies on background noise data from previously
proposed or consented wind farms, and separate considerations are made for the noise of the
current wind farm site, and then for the cumulative situation with all existing and consented
wind farms in the local area in addition to the proposed site. It is not entirely clear from the
evidence presented whether these limits have been correctly transposed, or that the higher
value for the adopted fixed limits have been justified. Further information on this aspect should
be sought from the Applicant. However, the size and scale of the proposals may justify the
use of the higher value fixed limit. In the absence of any new residential receptors being
identified (e.g. currently derelict properties), there are no reasons to object to the scheme on
noise grounds, but a suitably worded condition to limit the noise levels, tonality and amplitude
modulation should be applied. 
Air Quality – It has not been possible to obtain advice from Environmental Health on Air
Quality.
Lighting – It has not been possible to obtain advice from Environmental Health on Lighting
Shadow Flicker – The term ‘shadow flicker’ is given to the flickering effect created when a
rotating wind turbine rotor blade periodically casts a shadow across the windows and doors of

Page 23

a nearby property. The study indicated that only one property (High Clachaig) is located within
the range to be affected by shadow flicker from the proposal. It is expected that there will be
shadow flicker for up to 13 hours per year at High Clachaig, between the hours of 05:45 and
07:00. However, when considering that the property has no windows facing the proposal,
shadow flicker is not expected to affect residents inside the property. Whilst no significant
adverse effects are anticipated, if necessary, the following mitigation measures for shadow
flicker could be employed: affected dwellings can be screened from turbines to prevent
shadow flicker; and standard shadow flicker controllers can be installed on turbines to shut
them down when all parameters needed to cause shadow flicker are present, thereby
eliminating the problem.
Private Water Supplies - it has not been possible to obtain advice from Environmental Health
on Private Water Supplies. SEPA – have advised the ECU that they note that PWS (Private
Water Supplies) have been addressed as far as possible. West Kintyre Community Council –
have advised the ECU that they have been made aware of the possibility of there being several
properties close to the site with private water supplies that are not registered with the local
Council, they would expect the developer to ascertain the whereabouts of these private
supplies and ensure a full risk assessment of these is carried out to ensure that no harm would
come to them were the application to be approved.
Having due regard to the above subject to the recommended conditions being applied
in the event that consent is granted it is concluded that the proposal will not have any
adverse impacts on communities and individual dwellings, including, residential
amenity, noise and shadow flicker and subject to the recommended conditions is
consistent with the provisions of SG 2 Renewable Energy; LDP STRAT 1 – Sustainable
Development; LDP DM1 – Development within the Development Management Zones;
LDP 3 – Supporting the Protection, Conservation and Enhancement of our
Environment; LDP 6 - Supporting the Sustainable Growth of Renewables; SPP; NPF3;
Revised Draft NPF4 and the Onshore Wind Policy Statement in this regard. 
J. LANDSCAPE AND VISUAL IMPACTS, INCLUDING EFFECTS ON WILD LAND
(INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for wind turbine developments to be assessed against any
landscape and visual impacts including wild land. 
The Council’s Landscape Consultant undertook a Landscape and Visual Review of this
proposal (June 2022). The report drafted by Argyll & Bute Council’s landscape consultant is
based on a review of the Environmental Impact Assessment Report (EIAR) of April 2022 and
visits to the study area.
Background to the proposal - The original Clachaig Glen wind farm comprised 14 turbines with
13 of these 126.5m high to blade tip and the remaining turbine 115.5m high to blade tip. This
development gained consent on appeal in 2019. The current application (‘the proposal’) comprises
12 turbines (5 up to 200m high and 7 turbines 185m high) on the same site. The proposal
additionally includes a battery storage facility and widening of the access track from the A83 to
accommodate larger turbine components and visible aviation lighting is proposed to be fixed to the
nacelles of 8 turbines. 
Information provided in Landscape and Visual Impact Assessment (LVIA) - The LVIA has been
undertaken in accordance with the Guidelines for Landscape and Visual Impact Assessment,
Third Edition. While the Council’s Landscape Consultant agrees with the majority of the LVIA
findings on the significance of landscape and visual effects, they consider that in some
instances receptor sensitivity and the magnitude of change is under-estimated.

Page 24

The Design Statement provides a useful summary of the evolution of the consented scheme and
the current application. The figures provided to support the LVIA are clear and informative although
it would have been beneficial to have had baseline photographs from the additional wireline
viewpoint locations SW1 and SW2. 
The Council requested during scoping that comparative visualisations be produced showing the
consented scheme and the proposal from key viewpoints. This has not been done by the Applicant
using a justification that this would be contrary to 2018 guidance from NatureScot (EIA-R section
7.1). It is further explained in EIA-R paragraph 7.4.17 that it is assumed that the consented scheme
would not be built due to the lack of availability of smaller turbines.  For completeness sake, a
comparison of the change in effects between the consented scheme and the proposal (which
would involve increases of between 58 and 74m in the height of turbines) has been undertaken by
the Council’s landscape consultant using wireline visualisations from the Clachaig Glen Additional
Environmental Information (AEI) Report submitted to the Killean and Clachaig Glen Wind Farms
Conjoined Public Local Inquiry held in 2018. 
2017 Argyll and Bute Landscape Wind Capacity Study - The proposed wind farm lies within
the Upland Forest Moor Mosiac Landscape Character Type (LCT) identified in the Argyll &
Bute Landscape Wind Capacity Study (LWECS). This LCT covers the Kintyre peninsula
between Machrinhanish/Campbeltown in the south and West Loch Tarbert in the north. The
proposed turbines, which would be up to 200m high to blade tip, would fall within the ‘Very
Large’ typology considered in the LWECS. The LWECS concludes that the combined
landscape and visual sensitivity of the Upland Forest Moor Mosaic LCT is high-medium to
wind turbines of this size. The guidance set out in the study for this LCT advises that there is
very limited scope for additional turbines to be accommodated within this landscape principally
due to potential cumulative effects that could occur on the coastal fringes of Kintyre and on
views from Arran and Gigha. The area of the peninsula to the north of Beinn Bhreac is noted
as being particularly sensitive due to likely increased effects on Arran, Gigha and surrounding
seascapes. The guidance further advises that significant intrusion on adjacent settled and
small-scale landscape character types and on Arran and Gigha should be avoided by siting
larger turbines well back into the interior of these uplands. 
Since this study was issued in 2017 the Eascairt, Clachaig Glen I, Beinn an Tuirc III and High
Constellation wind farms have been consented on the Kintyre peninsula. The addition of these
wind farms increases sensitivity in terms of potential cumulative effects and reduces scope for
further wind farm development to be accommodated within the Upland Forest Moor Mosaic
LCT. 
The design of the proposal - The proposed turbines will be substantially larger than those
within nearby operational wind energy developments including the Cour, Freasdail, Beinn an
Tuirc, Blary Hill and Auchadaduie schemes. The difference in size between turbines in
operational wind farms will be principally appreciated from sections of the Kintyre Way and to
a lesser degree from the Sound of Gigha and Gigha where the proposal would be closer to
views and reasonably well-separated from other operational wind farms thus minimising
contrasts of scale. The combination of closer proximity and/or very large turbines will result in
the proposal being considerably more dominant or prominent (depending on distance) in views
from the west than existing wind energy developments located on the Kintyre peninsula.
Although not specifically noted as a design objective in the LVIA, the proposal appears to have
been designed to minimise intrusion on the west Kintyre coast. In general, the design layout of
turbines appears reasonably well-balanced from representative viewpoints with the exception of
Viewpoint 13 from the Kintyre Way where the overlap of turbines gives a very congested and
unsatisfactory appearance and contributes to the significant effects that will be experienced from
this long-distance recreational route. 
The proposed turbines at 200m and 185m height would dominate the scale of the Kintyre
peninsula when seen in views from the west where the near full extent of many turbines is
appreciable. In views from the east from Arran and from the north near Clachan, partial

Page 25

screening by landform reduces the perceived size of the turbines and they appear less
overwhelming in relation to other landscape features. It is considered that the size of the
turbines proposed is too large for the scale of the landscape of the Kintyre Uplands
appreciated from the Sound of Gigha and Gigha. 
Comparison of the effects of the consented scheme and the proposal  - There would be little
difference in the horizontal extent of theoretical visibility between the consented scheme and
the proposal with the key changes being in the numbers and/or vertical extent of the much
larger turbines now proposed seen in key views. 
Comparison of key views between the Clachaig Glen AEI 2018 (the consented scheme) and
the current proposal reveal the following:
 A greater number of turbines would be visible from Viewpoint 13 Kintyre Way and with
these appearing substantially larger and more congested than those in the consented
scheme. There would be a significant exacerbation of the effect on views. 
 The turbines within the proposal would have a much more dominant visual effect in views
from the Sound of Gigha and from the east coast of Gigha (Viewpoints 8, 9, 10, 12 and 15)
because of the substantially larger turbines. The proposed turbines would also appear
much larger in relation to the height of the Kintyre peninsula and would have a more
overwhelming effect on other landscape features such as clearly visible buildings, small
woodlands, and fields on the west coast of Kintyre. 
 In longer views from south Knapdale (Viewpoint 2) and the Islay ferry (Viewpoint 18),
a substantially greater vertical extent of turbines will be visible. The consented scheme
largely appeared as blade tips with very few hubs visible but all turbines would be seen
well above hub height in the proposal. 
Landscape effects - The proposed development site lies within the Kintyre Upland Forest Moor
Mosaic LCT identified in the LWECS. There would be direct and significant adverse effects on
the character of part of this LCT. 
There would be relatively limited visibility of the proposal from the Rocky Mosaic LCT which
covers the coastal fringes of Kintyre and Knapdale and from the Coastal Plain LCT which
covers a small part of the western coast of Kintyre in the Tayinloan area and while effects
would be adverse (with some localised significant effects on the character of the Rocky Mosiac
LCT associated with the removal of trees and hedgerows to accommodate construction traffic
on the access route from the A83) they would not be significant overall on these LCTs
(Landscape Character Type). 
There would be more consistent visibility of the proposal across the Sound of Gigha and
greater intrusion associated with very large turbines of up to 200m high to blade tip. The LVIA
considers effects on the Seascape Character Units (SCU) identified in the 2005 Scottish
Nature Heritage Commissioned Report 103. The Council’s Landscape Consultant considers
that these SCUs are too broad to form a basis for LVIA of a specific proposal and that more
detailed Local Coastal Character Areas (LCCA) should have been defined in accordance with
NatureScot’s Guidance Note on Coastal Character Assessment issued in 2018. 
It is considered that the Sound of Gigha, lying between Gigha and Kintyre would form a LCCA
more appropriate for detailed assessment. Representative viewpoints 8, 9, 10 and 15 within
the Sound of Gigha illustrate the degree of prominence of the proposal and the contrasts in
scale that would occur with the smaller scale settled coastal fringes and the relatively narrow
extent of water and it is concluded that these effects would significantly affect the character of
this LCCA. 
The requirement for visible aviation lighting on all turbines within the proposal will contribute
to the magnitude of change and duration of landscape effects. The sparsely settled Kintyre

Page 26

peninsula and surrounding seascapes have low night-time light levels and this would change
with the proposal. 
Effects on valued landscapes - The proposed turbines do not lie within a designated landscape
although the lower part of the proposed access track from the A83 is located in the West
Kintyre Area of Panoramic Quality (APQ). While there would be some localised significant
adverse effects associated with the proposed access track, visibility of the turbines would not
be widespread from the remainder of this APQ and also from the South Knapdale APQ. The
Council’s Landscape Consultant concludes that effects would not be significant overall on the
APQ designation in Argyll & Bute. Effects on the North Arran National Scenic Area (NSA) and
Arran Wild Land Area (WLA) are not considered in detail in this appraisal as these landscapes
lie outside Argyll & Bute. The Councils Landscape Consultant considers that effects on these
valued landscapes are however unlikely to be significant due to this proposal being located
on the west-facing hill slopes of the Kintyre peninsula which limits the vertical extent of turbines
visible from the east. 
Effects on visual amenity - The Zone of Theoretical Visibility (ZTV) mapping within the LVIA
indicates that visibility would be mainly concentrated over the Sound of Gigha and Gigha with
some patchier visibility across parts of south Knapdale and the interior of the Kintyre
peninsula. There would be some limited visibility from the west coast of Kintyre and from the
West Loch Tarbert area. There would be relatively little visibility from the east coast of Kintyre.  
Visibility of the proposal from the western coastal fringes of Kintyre would not be widespread
with effects on views from the A83 and settlement unlikely to be significant as evidenced by
Viewpoints 17 and 20 which show that blade tips only would be visible. Viewpoints 14 from
A’Chleit and Viewpoint 18 from the Glenacardoch area show that, while noticeable, intrusion
would be relatively minor as mainly blade tips would be visible. The proposal would however
have an increased intrusion from Point Sands and the Gigha Ferry Terminal at Tayinloan
(Viewpoints 11 and 12).
The most significant adverse effects of this proposal on views from within Argyll & Bute would
be on:
 The Kintyre Way, affecting approximately 2km of the route where it passes close to the
proposal near Loch na Naich as represented by Viewpoint 13. In these close views the
proposal would not be seen in the context of the more expansive upland landscape but
would impinge on the more intimately scaled views across the contained dip of Loch na
Naich. The proposal would have a very congested appearance in this view which are likely
to persist for up to 2km along the route where the turbines are seen more ‘end on’,
contributing to the significant effects on views. The proposal would also contribute to
significant cumulative effects on views from the route particularly when seen sequentially
with the operational and consented wind farms of Deucheran Hill and Cour which lie in the
middle part of the Kintyre peninsula. This proposal will contribute to the negative
incremental effects of wind farm development on the experience of receptors across the
length of the route. 
 Sound of Gigha – including from the Gigha ferry Representative viewpoints 15 and 10
demonstrate the prominence of the proposed turbines on views from the ferry and from
recreational watercraft where receptors are likely to focus on views east to Kintyre and
westwards to Gigha within the confines of the Sound. 
 Gigha where this proposal would be seen together with the nearby operational Blary Hill
Auchadaduie, Tangy and Beinn an Tuirc wind farms but would lie closer to key views along
the eastern coast of Gigha. The closer proximity and substantially larger turbines of this
proposal would result in a dominant effect on views from Ardminish and South Pier (and
from other areas on the east coast of the island) which focus on Kintyre. Views from the
small hill of Creag Bhan, which is the destination of a promoted walk, would also be

Page 27

significantly affected although the proposal would not interrupt the focus of views
westwards to Jura from this hill. 
While effects from the Islay ferry would not be significant due to the distances involved (14km
at the closest point of route shown in Viewpoint 6) and from the B8024 south of Kilberry
(Viewpoint 2 which lies at >18km) the turbines of the proposal will be clearly noticeable and
appear much larger than operational turbines on Kintyre resulting in adverse effects on views.
Visible aviation lighting effects - Visible aviation lights will be fixed to the nacelles of 8 turbines.
In-built mitigation measures include directional lighting shielding which would reduce the
intensity of lighting experienced from lower elevation views and a reduction in lighting from
2000 candela to 200 candela during good atmospheric conditions. Technical Appendix 7.2
provides details on the technical aspects of the lighting proposed but does not assess the
landscape and visual effects of the lighting. Night-time visualisations have been generated
from three viewpoints with the LVIA including Viewpoint 8 at Ardminish on Gigha, Viewpoint
11 from Point Sands and Viewpoint 24 from Beinn Bharrain on Arran. Reference is made to
these night-time visualisations in the detailed visual assessment in Technical Appendix 7.5
although no conclusions are reached on the specific effects of visible aviation lighting. 
Taking a worse-case scenario of 2000 candela lighting the Council’s Landscape Consultant
considers that visible aviation lighting could extend the duration of significant adverse effects
on views from sections of the Kintyre Way, from the Sound of Gigha and from the east coast
and hills of Gigha particularly given the low light levels and dark skies of this sparsely settled
study area.
Cumulative landscape and visual effects - The greatest cumulative effects with operational,
consented and application-stage wind farms will be experienced from the Kintyre Way, the
Sound of Gigha and from Gigha. 
Cumulative effects on the Kintyre Way - In terms of consented and application-stage
proposals, the Clachaig Glen proposal would be seen together and sequentially from the
Kintyre Way with the nearby Narachan wind farm forming a cluster of wind turbine
development in the middle part of the Kintyre peninsula together with the operational
Deucheran Hill and Cour wind farms. This proposal would make a major contribution to
significant cumulative effects on the section of the Kintyre Way between Tayinloan and
Carradale due to the size of the turbines and their close proximity to the route.
Cumulative effects on views from the Sound of Gigha and Gigha - This proposal would be
seen with the operational Auchadaduie, Blary Hill, Tangy and Beinn an Tuirc wind farms in
views from the Sound of Gigha and the south-east coast of Gigha. It has been noted in the
preceding text that this proposal would appear significantly more prominent in these views
than these operational wind farms. 
The consented High Constellation and Airigh wind farms would be more visible in views from
the north-eastern part of Gigha. They would be seen together with this proposal from the small
hill/Core Path of Creag Bhan on Gigha. The application-stage Sheirdrim and Narachan wind
farms would also be prominent from this elevated viewpoint. An additional wireline
visualisation has been produced from Creag Bhan (SW1) but it should be noted that there is
no accompanying baseline photograph and it does not show all the operational, consented
and application-stage wind farms that would be visible. The combined effect of consented and
application-stage wind farms would result in significant cumulative effects from Creag Bhan
and from other parts of north-east Gigha. 
Conclusions - The proposed site lies within the Upland Forest Moor Mosaic LCT identified in
the Argyll & Bute LWECS. This landscape has some characteristics which reduce sensitivity
to large scale wind energy development including a generally simple landform and land cover
and an expansive scale. However, these uplands already accommodate a number of
operational and consented wind farms which limits scope for further wind farm development

Page 28

whilst minimising effects on more sensitive landscape and visual receptors within the Kintyre
coasts, West Loch Tarbert and the islands of Gigha and Arran.
This proposal would have significant adverse effects on the character of the Upland Forest
Moor Mosaic LCT. It would also significantly and adversely affect the character of the Sound
of Gigha between Gigha and Kintyre. There would be relatively limited views from the settled
east and west coasts of Kintyre but with more extensive visibility occurring across the Sound
of Gigha, Gigha and from the more sparsely settled upland area immediately surrounding the
proposed development. 
A consent for 14 turbines between 115.5m and 126.5m applies to the site. This proposal
comprises 12 turbines between 185m and 200m. The principal change between the consented
and proposed scheme is the greater degree of intrusion associated with the substantially
larger turbines now proposed on views from the Sound of Gigha and from the eastern side of
Gigha, and also in close views from a section of the Kintyre Way. The visible aviation lighting
fixed to 8 of the proposed turbines would also be likely to extend the duration of significant
adverse visual effects experienced from these same locations. In views from Gigha and the
Sound of Gigha the proposal would be significantly larger than other operational and
consented wind farms and would form a key focus in views towards the Kintyre peninsula,
detracting from the scenic character of water, settled coastal fringe and uplands. 
The potential cumulative effects of this proposal with the Sheirdrim and Narachan application-
stage wind farms are additionally of concern as together these schemes would dominate views
to the east from the north-eastern part of Gigha. Lighting of the Narachan wind farm and this
proposal could extend the duration of significant adverse cumulative effects during hours of
darkness.
It is recommended that an objection should be raised to this proposal on landscape and visual
grounds. There could be scope to mitigate the effects of this proposal through a reduction in
the size of turbines and possible omission/reposition of more prominent turbines (for example
Turbines 1 and 3 which are particularly prominent in views from the west). Further mitigation
of visible aviation lighting should also be considered through the installation of an Aircraft
Detection Lighting System once approved by the CAA which would significantly reduce the
duration of lighting.
The Council’s landscape consultant recommended the following visualisations for the
Committee to review:
 EIA-R Figure 7.6a/b – Zone of Theoretical Visibility maps
 EIA-R Viewpoints 8, 9 and Supplementary Visualisations SW1 from Gigha including
night-time visualisation from Viewpoint 8 Ardminish. 
 EIA-R Viewpoints 10 and 15 Sound of Gigha
 EIA-R Viewpoints 13 and 16 – close views from the Kintyre Way and track used by
walkers near North Muasdale.
 The Clachaig Glen consented scheme Additional Environmental Information Report
November 2018 – comparison of the changes between the consented and proposed
scheme from the Sound of Gigha, Gigha, the Kintyre Way, Islay ferry and south of
Kilberry. 
 It will also be useful for Committee members to compare the effects of the Narachan
wind farm application in views from Gigha to help inform their view of the differences
in the degree of intrusion between the two proposals. These differences principally
relate to the greater distance and the more effective screening by ridges lying
immediately west of the Narachan wind farm which reduce the perceived size of the
turbines appreciated from the east coast of Gigha when compared with the Clachaig
Glen turbines (see Viewpoint 8 Ardminish Figure VP8.2 in the Clachaig Glen EIA-R)

Page 29

The Applicant organised for the 15 visualisation packs to be printed for Members’
consideration. The only exclusion from the Council’s Landscape Consultants list is the
“Additional Environmental Information Report November 2018” and associated “Figure
VP8.2”. The reason provided for this is that the Applicant does not agree that outdated
assessment work on the Consented Development is relevant, as the scheme is no longer
being promoted.
NatureScot - have advised the ECU that the nature and scale of the proposal in this location
cannot be accommodated without significant adverse landscape and visual effects, including
cumulative effects and night time effects. 
Significant adverse effects of the proposal are predominantly in relation to Gigha and the
Sound of Gigha, as well as part of Kintyre. In NatureScot’s view, turbines of this scale in this
location, would detract from the character, scenic views and experience as currently enjoyed
by tourists and residents in these areas. There would also be significant cumulative effects
when the proposals are considered with operational, consented, and proposed wind farms.
NatureScot consider that the proposal would have some significant effect on the appreciation
of the relatively dark rural setting as a result of the proposed turbine lighting. 
A significant reduction in the height of turbines together with careful design consideration to
remove/ relocate the most prominent turbines could mitigate these effects. 
The proposed turbines would require aviation lighting, in a sparsely populated area
characterised by low levels of artificial light at night. While proposed measures to control the
intensity and direction of lighting could significantly reduce the potential for effects, there would
be significant night-time landscape and visual effects within the area immediately surrounding
the site. There would be more extensive significant effects should the 2000cd lighting be
unmitigated. 
West Kintyre Community Council have advised the ECU that they object to this proposal on
the grounds of Landscape and Visual Impact. East Kintyre Community Council have advised
the ECU that they object to the proposal on the grounds of visual amenity due to cumulative
harmful visual impacts contrary to Argyll & Bute Council’s Policy LDP 6 and Proposed Local
Development Plan 2 Diagram 7; and Community Development Amenity due to the wholesale
harmful impacts to a designated Tourism development area. 
Access & Turning Area – In addition to objecting to the Consented Development, the Council
also raised concern regarding the landscape and visual impact of the large turning area
proposed on the opposite side of the A83. This concern was not shared by the Reporters who
granted consent, which includes a condition requiring details of this turning area to be
submitted. The proposed turning area is also included in the current application, but as it
already has consent and has not changed, it is not considered prudent to repeat these
concerns. 
Battery Storage – Whilst, the provision of battery storage meets the requirements of policy,
Officers are concerned that no consideration has been given to the Landscape & Visual Impact
of this battery storage facility. This is a large facility of 27 shipping containers proposed to be
located in a rural landscape. In other proposals considered by the Council these areas are
usually depicted on the photomontages. It is the view of the Council that the ECU should
consider the landscape and visual impact of these before reaching a decision on this
application. 
All the above consultee advice and responses have been considered. Officers concur with the
expert advice of NatureScot and the Council’s landscape consultant in respect to landscape
and visual impacts (including cumulative).

Page 30

Having due regard to the above it is concluded that the proposal will have adverse
landscape and visual impacts (including cumulative and is therefore inconsistent with
the provisions of: SG LDP ENV 14 –Landscape; SG 2 Renewable Energy; LDP STRAT 1
– Sustainable Development; LDP DM1 – Development within the Development
Management Zones; LDP 3 – Supporting the Protection, Conservation and
Enhancement of our Environment; Policy LDP 6 – Supporting the Sustainable Growth
of Renewables of the Argyll & Bute Local Development Plan; SPP; NPF3; Revised Draft
NPF4 and the Onshore Wind Policy Statement. 
K. EFFECTS ON NATURAL HERITAGE INCLUDING BIRDS (INCLUDING CUMULATIVE
IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for wind turbine developments to be assessed against any
impact they may have on natural heritage including birds. 
Ornithology 
The Royal Society for the Protection of Birds Scotland (RSPB) – have advised the ECU that
they do not object to this proposal, however they advise that turbines T1 and T3 are moved
eastwards from open ground/blanket bog and are sited within the forestry and that turbine T4
(Turbine 4) is moved from the edge further into the forestry. This would minimise potential
collision by hen harriers and kestrel, and assist in reducing habitat loss to golden eagles plus
reduce blanket bog and carbon impacts. Borrow pits (BP06) should be in an area of existing
forestry rather than impact on open ground habitats. A Habitat Management Plan should also
be secured to minimise the carbon impact of the development and mitigate for biodiversity
impacts (upland management outcomes that delivers positively for golden eagles. 
Designated Sites 
NatureScot have advised the ECU that there would be no adverse effect on the integrity of the
Kintyre Goose Roosts Special Protection Area (SPA) and there would be no significant effect
on wider countryside populations of golden eagle or hen harrier in Natura Heritage Zone (NHZ)
14. The status of the SPA means that the requirements of the Conservation (Natural Habitats,
&c.) Regulations 1994 as amended (the “Habitats Regulations”) apply, or (for reserved
matters), the Conservation of Habitats and Species Regulations 2010 as amended apply.
Scottish ministers are therefore required to carry out an Appropriate Assessment in view of
the site’s conservation objectives for its qualifying interest. To help with  this NatureScot have
advised the ECU that, in their view, based on the information provided and appraisal carried
out to date, the proposal will not adversely affect the integrity of the site. No flights by
Greenland white-fronted geese were recorded within 400m of the proposed turbine locations.
There is therefore a very low risk of collisions. Neither is there any foraging habitat within the
site that is functionally-linked to the SPA, so there is a very low likelihood of any displacement
and disturbance effects. 
Ecology 
SEPA advice on Ecology – have advised the ECU that they request that the restoration of
56.2ha to blanket bog is secured by condition or other planning measure.
The Council’s Local Biodiversity Officer – has no objection to the proposal and has advised
that the information provided is acceptable in respect to: a Construction Environment
Management Plan incorporating a Peat Management Plan, Habitat Management Plan, culvert
details, silt management, maintenance of hydrological regime and treatment/storage of borrow

Page 31

pit soil/vegetation; there were no limitations arising from COVID-19, surveys continued
uninterrupted whilst adhering to COVID-19 restrictions; Blanket bog/Groundwater Dependent
Terrestrial Ecosystems (GWDTE) hydrology have been considered; and Native woodland and
other habitats/species recommended by the Local Biodiversity Officer have been considered. 
Fish 
Marine Scotland Science (MSS) - have advised the ECU that resident brown trout populations
may be present which are listed as a priority species for conservation in the Scottish
Biodiversity List and, if so MSS advise that a fish population monitoring programme should be
established to monitor these fish populations before, during and after construction. MSS also
advise that the developer establishes a water quality monitoring programme as felling is
proposed and acidification is a known problem in the area. The water quality monitoring
programme should be integrated with the fish population monitoring programme and follow
MSS generic monitoring programmes. The developer states “yes” to a designated area, for
which fish is a qualifying feature within/or downstream of the proposed development area.
MSS are unsure what designated area that the developer is referring to. MSS are satisfied
that a decommissioning and restoration plan is included in a condition, should consent be
granted for this development. 
Argyll District Salmon Fishery Board – in their most recent response they have advised the
ECU that on review of the site location, they accept the Applicant’s conclusions in that 
monitoring may not be effective or appropriate in this case. 
Forestry - The majority of the site is currently forested and managed by FLS for timber
production, except for the higher land on the eastern boundary of the site. The crop is in
various stages of growth across the site with forestry operations currently ongoing. In Scottish
Forestry (SF) most recent consultation response they advised the ECU that they are content
that the proposal meets the UKFS species diversity requirements and confirm that they have
no outstanding issues with the proposal. Planning conditions to secure Compensatory
Planting and a Long Term Forest Plan in the event the proposal receives consent are
recommended. 
Crown Estate Scotland have confirmed to the ECU that the assets of Crown Estate Scotland
are not affected by this proposal and they have no comments to make. 
Having due regard to the above it is concluded that subject to the conditions
recommended by NatureScot, Marine Scotland, SEPA, Scottish Forestry, RSPB
Scotland and the Council’s Local Biodiversity Officer the proposal is acceptable in
terms of natural heritage and birds and is consistent with the provisions of SG LDP
ENV 1 – Development Impact on Habitats, Species and Our Biodiversity (i.e. biological
diversity); SG LDP ENV 7 – Water Quality and the Environment; SG 2 Renewable
Energy; LDP STRAT 1 – Sustainable Development; LDP DM1 – Development within the
Development Management Zones; LDP 3 – Supporting the Protection, Conservation
and Enhancement of our Environment; Policy LDP 6 – Supporting the Sustainable
Growth of Renewables of the Argyll & Bute Local Development Plan; SPP; NPF3;
Revised Draft NPF4; Onshore Wind Policy Statement, Scottish Government; and The
Scottish Government’s Policy on ‘Control of Woodland Removal’ (Forestry
Commission Scotland 2009). 
L. IMPACTS ON CARBON RICH SOILS, USING THE CARBON CALCULATOR (INCLUDING
CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, Supplementary Guidance

Page 32

2 and SPP require applications for renewable energy developments to be assessed against
any impact they may have on carbon rich soils, using the carbon calculator. 
Carbon balance calculations for this proposal have been undertaken in accordance with the
Scottish Government guidance and these are reported in Chapter 11 of the EIAR. The carbon
balance calculations found that the proposal could result in a relative saving of just over 3.1
million tonnes of carbon dioxide equivalent emissions over its lifetime (35 years) if a fossil fuel
mix of electricity generation were used as the counterfactual. It is expected to take 1.8 years
for the carbon lost during construction to be ‘paid back’ by the carbon saved through
generating electricity from a renewable energy resource. It is important to note that the carbon
balance calculations do not account for a replanting regime, the 56.2 ha of peatland restoration
proposed or the battery storage facility due to limitations with the calculator and in order to
produce a robust result. 
SEPA – Peat – have advised the ECU that they request that the requirement for floating tracks
and their design is a matter addressed by a condition attached to any grant of consent. 
SEPA – Peat Management Plan – have advised the ECU that they request that a condition is
attached to any grant of consent requiring that a Peat Management Plan be submitted, agreed
by relevant parties including SEPA, and implemented in full. 
Ironside Farrar (Environmental Consultants on behalf of Scottish Government ECU to audit
Peat Landslide Hazard Risk Assessment (PLHRA)) – advised the ECU in their most recent
response that they have considered the Applicant’s response to their initial consultation advice
and the information submitted addresses the queries raised and concludes the assessment,
no further response is required. It is noted that several actions require to be followed through
at construction stage and several points are noted for future reporting. 
Having due regard to the above, subject to the recommended conditions it is concluded
that the proposal will not have an adverse impact on carbon rich soils, using the carbon
calculator and is therefore consistent with the provisions of SG LDP ENV 1 –
Development Impact on Habitats, Species and Our Biodiversity (i.e. biological
diversity); SG LDP ENV 11 – Protection of Soil and Peat Resources; SG 2 Renewable
Energy; LDP STRAT 1 – Sustainable Development; LDP DM1 – Development within the
Development Management Zones; LDP 3 – Supporting the Protection, Conservation
and Enhancement of our Environment; Policy LDP 6 – Supporting the Sustainable
Growth of Renewables of the Argyll & Bute Local Development Plan; SPP; NPF3;
Revised Draft NPF4 and the Onshore Wind Policy Statement. 
M. PUBLIC ACCESS, INCLUDING IMPACT ON LONG DISTANCE WALKING AND CYCLING
ROUTES AND THOSE SCENIC ROUTES IDENTIFIED IN THE NPF (INCLUDING
CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against any
impact they may have on public access, including impact on long distance walking and cycling
routes and those scenic routes identified in NPF 3. 
Both West Kintyre and East Kintyre Community Councils have raised concern in their
objections to the ECU regarding the impact of this proposal on the Kintyre Way. The
Landscape & Visual Impact of the proposal on the Kintyre Way is considered under Section J
of this report. 
Having due regard to the above it is concluded that the proposal will not have  any
adverse physical impacts on public access, including impact on long distance walking

Page 33

and cycling routes and those scenic routes identified in the NPF3 and is therefore
consistent with the provisions of SG 2 Renewable Energy, SG LDP TRAN 1 – Access to
the Outdoors; LDP STRAT 1 – Sustainable Development; LDP DM1 – Development
within the Development Management Zones; LDP 3 – Supporting the Protection,
Conservation and Enhancement of our Environment; Policy LDP 6 – Supporting the
Sustainable Growth of Renewables of the Argyll & Bute Local Development Plan; SPP;
NPF3; Revised Draft NPF4 and the Onshore Wind Policy Statement. 
N. IMPACTS ON THE CULTURAL HERITAGE, INCLUDING SCHEDULED MONUMENTS,
LISTED BUILDINGS AND THEIR SETTINGS (INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against any
impact they may have on the historic environment, including scheduled monuments, listed
buildings and their settings. 
Historic Environment Scotland (HES) – have advised the ECU that they do not wish to object
to the proposal. They consider that there would be a significant adverse impact on the setting
of the Dunan Muasdale, dun (SM3223) scheduled monument. They also note that a minor
level of adverse impact would occur on the settings of other nearby heritage assets in their
remit. They are nevertheless content that none of these impacts are of a level that would raise
issues in the national interest. 
The West of Scotland Archaeology Service (WOSAS) – advise that they have no objection
subject to condition to secure the implementation of a programme of archaeological works in
accordance with a written scheme of investigation to be agreed by the West of Scotland
Archaeology Service, approved by the Planning Authority and thereafter fully implemented
and that all recording and recovery of archaeological resources within the site is undertaken
to the satisfaction of the Planning Authority in agreement with the West of Scotland
Archaeology Service. 
Having due regard to the above it is concluded that based on the advice of Historic
Environment Scotland and the West of Scotland Archaeology Service that, subject to a
condition to secure a scheme of archaeological investigation that this proposal is
consistent with the provisions of SG LDP ENV 15 – Development Impact on Historic
Gardens and Designed Landscapes; SG LDP ENV 16(a) – Development Impact on Listed
Buildings; SG LDP ENV 19 –Development Impact on Scheduled Ancient Monuments;
SG LDP ENV 20 – Development Impact on Sites of Archaeological Importance; LDP 3 –
Supporting the Protection, Conservation and Enhancement of our Environment; Policy
LDP 6 – Supporting the Sustainable Growth of Renewables; and SG 2 Renewable
Energy of the Argyll & Bute Local Development Plan; SPP; the Onshore Wind Policy
Statement and Historic Environment Policy for Scotland in this respect. 
O. IMPACTS ON TOURISM AND RECREATION (INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against any
impact they may have on tourism and recreation. 
Mountaineering Scotland have advised the ECU they have no comment to make on the
proposal.

Page 34

British Horse Society – have provided advice to the ECU on the importance of off-road riding
and active travel and suitable infrastructure. They have not raised any objection to the
proposal. 
West Kintyre Community Council – have advised the ECU that they object on the grounds of
Tourism Impact. East Kintyre Community Council – have advised the ECU that they object to
the proposal on the following grounds of Community Development Amenity due to the
wholesale harmful impacts to a designated Tourism development area. These concerns will
be considered by the ECU in their determination of the application. 
The Council regards landscape as being a particularly valued asset both in terms of its intrinsic
qualities and in terms of its value to the tourism economy. For all types of development the
maintenance of landscape character is an important facet of decision-making in the
countryside in Argyll & Bute, regardless of the scale of development proposed. The Council’s
LDP Policy LDP 6 identifies impacts on tourism and recreation as a material consideration in
the assessment of renewable energy developments on the basis that inappropriate
developments with significant adverse effects which contribute to the degradation of
landscape character are unlikely to be in the interests of the Argyll tourism economy. 
The concerns expressed regarding the adverse landscape and visual impact this proposal will
have on tourism have been considered. As these two matters are intrinsically linked, and there
is little evidence to demonstrate whether wind farms adversely affect tourism, it is considered
that such impacts are covered in the landscape and visual impact assessment of the proposal
and recommended reason for objection. 
Having due regard to the above, in terms of the impacts on tourism and recreation the
proposal is considered to be consistent with the provisions of: SG LDP TRAN 1 –
Access to the Outdoors; LDP STRAT 1 – Sustainable Development; LDP DM1 –
Development within the Development Management Zones; LDP 3 – Supporting the
Protection, Conservation and Enhancement of our Environment;  Policy LDP 6 –
Supporting the Sustainable Growth of Renewables; SG LDP ENV 14 –Landscape; and
SG 2 Renewable Energy of the Argyll & Bute Local Development Plan, SPP; NPF 3;
Revised Draft NPF 4 and the Onshore Wind Policy Statement in this respect. 
P. AVIATION, DEFENCE AND SEISMOLOGICAL RECORDING (INCLUDING CUMULATIVE
IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against any
impact they may have on Aviation, Defence and Seismological Recording. 
Glasgow Prestwick Airport (GPA) have advised the ECU that following further examination of
their Instrument Flight Procedures (IFP’s), they are now content that there will be no adverse
impact on published Terminal Arrival Area (TAA) minimum altitudes in the location of the
proposal. Consequently, GPA is content to remove its remaining aviation holding objection to
this development. Defence Infrastructure Organisation/ Ministry of Defence (MOD) – have
advised the ECU that they have no objection subject to conditions to secure: aviation lighting
and aviation charting & safety management. Highlands and Islands Airports Limited (HIAL) -
have advised the ECU that their calculations show that, at the given position and height, the
proposal would not infringe the safeguarding criteria for Campbeltown Airport. Therefore,
Highlands and Islands Airports Limited has no objections to the proposal. National Air Traffic
Services Safeguarding (NATS) have advised the ECU that the proposal has been examined
from a technical safeguarding aspect and does not conflict with NATS safeguarding criteria.

Page 35

Accordingly, NATS (En Route) Public Limited Company ("NERL") has no safeguarding
objection. 
Having due regard to the above it is concluded that subject to the recommended
conditions the proposal will not have any adverse impacts on aviation and defence
interests and seismological recording and is therefore consistent with the provisions
of SG 2 Renewable Energy, Policy LDP 6 – Supporting the Sustainable Growth of
Renewables and SG LDP TRAN 7 –Safeguarding of Airports of the Argyll & Bute Local
Development Plan, SPP; NPF3; Revised Draft NPF4 and the Onshore Wind Policy
Statement in this respect. 
Q. IMPACTS ON TELECOMMUNICATIONS, BROADCASTING INSTALLATIONS AND
TRANSMISSION LINKS (INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against any
impact they may have on telecommunications, broadcasting installations and transmission
links. BT have advised the ECU that the Project indicated should not cause interference to
BT’s current and presently planned radio network and they have not raised any objection to
the proposal. The Joint Radio Company Limited has advised the ECU that this proposal is
cleared with respect to radio link infrastructure operated by Scottish Hydro (Scottish &
Southern Energy) and Scotia Gas Networks, and they have no objection to the proposal. 
Having due regard to the above it is concluded that the proposal will not have any
adverse impacts on telecommunications, broadcasting installations and transmission
links (including cumulative impacts) and is consistent with the provisions of SG 2,
Renewable Energy, Policy LDP 6 – Supporting the Sustainable Growth of Renewables
of the Argyll & Bute Local Development Plan, SPP; NPF3; Revised Draft NPF4 and the
Onshore Wind Policy Statement in this respect. 
R. IMPACTS ON ROAD TRAFFIC AND ADJACENT TRUNK ROADS (INCLUDING
CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against any
impact they may have on road traffic and adjacent trunk roads. 
Access to the site will be taken from the Killean Estate junction with the A83, approximately
1km to the north of Muasdale, with the access following the existing Cross-Kintyre Timber
Haul Route to the east, then to the south to the site entrance using the existing forestry track.
This is the same access as the Consented Development. The access track between the A83
and the main site is approximately 6km in length. 
Transport Scotland (TS) – have advised the ECU that, in their most recent response that they
have considered the Applicants response to their initial advice and can confirm that they have
no objection subject to conditions in the event that consent is granted. These conditions relate
to: approval of proposed route for any abnormal loads on the trunk road and any
accommodation measure required; during delivery period of construction materials any
additional signing or temporary traffic control measures must be undertaken by a recognised
QA traffic management consultant, to be approved by Transport Scotland before delivery
commences; and Prior to commencement of deliveries to site, a Construction Traffic
Management Plan must be submitted to and approved by Transport Scotland to ensure that
general construction traffic and abnormal loads can be transported along the trunk road
network safely and efficiently.

Page 36

The Council’s Roads & Amenity Services have advised that they have no objection to the
proposal. The access to this site is from the A83 Tarbet - Campbeltown Trunk Road, and that
the advice of Transport Scotland should be sought by the ECU. 
Having due regard to the above, subject to the relevant conditions being attached to
any consent granted by the ECU, it is concluded that the proposal  will not have any
adverse impacts on road traffic and adjacent trunk roads and the proposal is consistent
with the provisions of SG2 Renewable Energy, Policy LDP 6 – Supporting the
Sustainable Growth of Renewables; SG LDP TRAN 4 – New and Existing, Public Roads
and Private Access Regimes of the Argyll & Bute Local Development Plan, SPP; NPF3;
Revised Draft NPF4 and the Onshore Wind Policy Statement in this respect.   
S. EFFECTS ON HYDROLOGY, THE WATER ENVIRONMENT AND FLOOD RISK
(INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, Supplementary Guidance
2: Renewable Energy and SPP require applications for renewable energy developments to be
assessed against effects on hydrology, the water environment and flood risk. 
SEPA advice on Geology, Hydrology & Hydrogeology – have advised the ECU that they
request that a condition is attached to any grant of consent requiring that the Watercourse
Crossing Strategy be agreed by relevant parties including SEPA, with amendments as
required, and implemented in full. 
SEPA advice on Flood Risk – have advised the ECU that they note that the impacts of
downstream flooding, particularly on the Clachaig Water, have been raised in connection with
surface water run-off. SEPA note that this has been addressed in the report. Due to the
minimal areas of hardstanding proposed, it is considered that the proposal would not
significantly increase the risk of downstream flooding. SEPA consider that this is a matter for
the determining authority to consider in consultation with the Council. 
Representations – the ECU is in receipt of 2 representations which raise concern regarding
the potential for increased risk of flooding as a result of this proposal. The Councils Flood Risk
Assessor was consulted further on the letters of representation which raise concerns in
respect to flooding. The Flood Risk Assessor has no objection to the proposal subject to
planning conditions to the effects of the following: watercourse crossings not to reduce the
cross-sectional area of the channel and ideally be designed to convey the 1:200 year plus
climate change flow plus an allowance for freeboard; and drainage to be designed in
accordance with CIRIA C753 guidance and post-development surface water runoff should not
exceed pre-development surface water runoff. 
Having due regard to the above, subject to the relevant conditions being attached to
any consent, it is concluded that the water environment and flood risk have been
considered and the proposal is consistent with the provisions of SG 2 Renewable
Energy, Policy LDP 6 – Supporting the Sustainable Growth of Renewables and SG LDP
SERV 7 – Flooding and Land Erosion – The Risk Framework for Development of the
Argyll & Bute Local Development Plan, SPP; NPF3; Revised Draft NPF4 and the
Onshore Wind Policy Statement in this respect.   
T. THE NEED FOR CONDITIONS RELATING TO THE DECOMMISSIONING OF
DEVELOPMENTS, INCLUDING ANCILLARY INFRASTRUCTURE, AND SITE
RESTORATION (INCLUDING CUMULATIVE IMPACTS)

Page 37

Policy LDP 6 – Supporting the Sustainable Growth of Renewables, Supplementary Guidance
2: Renewable Energy and SPP require applications for renewable energy developments to be
assessed against the need for conditions relating to the decommissioning of developments,
including ancillary infrastructure, and site restoration. 
Following construction and commissioning, the proposal would be operational and generating
electricity for a period of approximately 35 years, after which it would be decommissioned and
removed, or alternatively, a further planning application could be made to extend the period of
operation. If a further application is not submitted, decommissioning would involve the total
removal of above-ground infrastructure. This would involve retention of existing access tracks
for forestry operations. Reinstatement of the site would be carried out in accordance with an
approved method statement. It is recommended that this matter is covered by planning
conditions or a legal agreement consistent with other projects across Argyll & Bute in the event
that the proposal obtains consent. 
Having due regard to the above it is concluded that the need for conditions relating to
the decommissioning of developments, including ancillary infrastructure, and site
restoration has been considered and the proposal is therefore consistent/inconsistent
with the provisions of SG 2 Renewable Energy, Policy LDP 6 – Supporting the
Sustainable Growth of Renewables of the Argyll & Bute Local Development Plan, SPP;
NPF3; Revised Draft NPF4 and the Onshore Wind Policy Statement in this respect. 
U. OPPORTUNITIES FOR ENERGY STORAGE (INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, Supplementary Guidance
2: Renewable Energy and SPP require applications for renewable energy developments to be
assessed against any opportunities for energy storage which exist. 
A battery storage facility with an expected upper capacity of 30MW forms part of the proposal
alongside the wind farm. The battery storage facility is to be installed in part of the construction
compound on completion of most of the construction works. It will comprise 27 containers not
exceeding 2.6m high. The maximum dimensions of the facility will be 75m (l) x 60m (w) and it
will be surrounded by a 2.5m high security fence. The containers’ location within the
construction compound (near the completion of the construction of the remainder of the
proposal) is advantageous as this area will already be established as suitable for equipment
and tree felling completed. Additional land take will therefore not be required for the facility
and the surrounding forestry is also not scheduled in the updated Carradale Land
Management Plan (FLS, unpublished) for felling until 2041 to ‘post-2045’, providing some
screening of the battery facility. 
Whilst, the provision of battery storage meets the requirements of policy, Officers are
concerned that no consideration has been given to the Landscape & Visual Impact of this
battery storage facility. This is a large facility of 27 shipping containers proposed to be located
in a rural landscape. Before a decision is reached on this proposal by the ECU it is the view
of Officers that the impacts of this needs to be considered. 
Having due regard to the above it is recommended that the Council should not object
to the proposal on the grounds of opportunities for energy storage (including
cumulative impacts) in accordance with the provisions of SG 2 Renewable Energy,
Policy LDP 6 – Supporting the Sustainable Growth of Renewables of the Argyll & Bute
Local Development Plan, SPP; NPF3; Revised Draft NPF4 and the Onshore Wind Policy
Statement.

Page 38

V. THE NEED FOR A ROBUST PLANNING OBLIGATION TO ENSURE THAT OPERATORS
ACHIEVE SITE RESTORATION (INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, Supplementary Guidance
2: Renewable Energy and SPP require applications for renewable energy developments to be
assessed against the need for a robust planning obligation to ensure that operators achieve
site restoration. 
The operational lifetime of the proposal will be 35 years. A period of approximately 12 months
(up to a maximum of 18 months) will be required for any tree felling and subsequent
construction and, following the 35-year operational period, a maximum of 12 months is
expected to be required for decommissioning. It is possible that a further planning application
could be made to extend the period of operation. If a further application is not submitted,
decommissioning will involve the removal of the turbines and all above ground infrastructure
of the wind farm, except for roads which will be used as forest tracks thereafter for
maintenance of the forest and any peatland restoration implemented either by the developer
or FLS as part of the Land Management Plan. It is recommended that this matter is covered
by planning conditions or a legal agreement consistent with other projects across Argyll & Bute
in the event that the proposal obtains consent from the ECU. 
Having due regard to the above it is concluded that opportunities for a robust planning
obligation to ensure that operators achieve site restoration have been considered and
the proposal is therefore consistent with the provisions of SG 2 Renewable Energy,
Policy LDP 6 – Supporting the Sustainable Growth of Renewables of the Argyll & Bute
Local Development Plan, SPP; NPF4; Revised Draft NPF4 and the Onshore Wind Policy
Statement in this respect. 
W. NATIONAL PLANNING POLICY & GUIDANCE 
SPP, NPF3 and NPF4 
Despite now being seven years old, NPF3 and SPP are extant statements of Scottish
Government planning policy and will remain in place until such time as NPF4 is adopted. The
status of NPF3 and SPP has not changed and they are significant material considerations in
the determination of the present application. 
SPP 
Notwithstanding the overarching context of support, SPP recognises that the need for energy
and the need to protect and enhance Scotland’s natural and historic environments must be
regarded as compatible goals. 
Planning Balance, Paragraph 33 of SPP – In respect to SPP, the Applicant’s Planning
Statement concludes that the ‘tilted balance’ in favour of sustainable development applies in
relation to this proposal, given that the Local Development Plan is greater than 5 years old.
SPP Paragraph 33 states: 
“Where relevant policies in a development plan are out-of-date or the plan does not contain
policies relevant to the proposal, then the presumption in favour of development that
contributes to sustainable development will be a significant material consideration. Decision-
makers should also take into account any adverse impacts which would significantly and
demonstrably outweigh the benefits when assessed against the wider policies in this SPP.
The same principle should be applied where a development plan is more than five years old.”

Page 39

Officers note that para 33 states “where relevant policies in a development plan are out of
date”, however, this is normally applied to policies on housing or industrial land supply, where
LDP’s make specific allocations to cover specified periods of time. The policy on renewables
in LDP1 and its Supplementary Guidance do not relate to a specific period of time and are
consistent with this being the Scottish Governments most up to date expression of planning
policy, and therefore it is considered that the relevant policies are not out of date. 
Additionally, the proposed replacement Local Development Plan 2 is currently at examination,
and it is anticipated that the Reporters’ recommendations will be received in the next few
months, the Council could therefore be in a position to Adopt LDP2 in the first quarter of 2023.
Policy 30 in pLDP2 – The Sustainable Growth of Renewables, is essentially the same a Policy
LDP 6 in the Adopted LDP, and while this policy is subject to examination, it is consistent with
SPP 2014. 
Officers therefore do not agree that the ‘tilted balance’ in favour of sustainable development
applies to this proposal. 
There is close alignment between the policy established by the Council’s Local Development
Plan and the expression of government policy in SPP. These policies are underpinned by the
over-riding imperative to secure sustainable economic development. The Report of Handling
provides an assessment of the proposal against each of the key considerations identified in
Policy LDP6 and Para 169 of SPP. 
Onshore wind is recognised as being a key component in the aim to increase renewable
energy generation. However, where the Applicant has failed to adequately demonstrate that
there would be no unacceptable significant adverse effects, whether individual or cumulative,
including those on landscape character and visual amenity, the proposal will not benefit from
support in terms of the presumption in favour of sustainable development afforded by Policy
LDP 6, or SPP. 
Paragraph 28 of SPP 
The SPP introduced a presumption in favour of development that contributes to sustainable
development. Paragraph 28 states: 
“The planning system should support economically, environmentally, and socially sustainable
places by enabling development that balances the costs and benefits of a proposal over the
longer term. The aim is to achieve the right development in the right place; it is not to allow
development at any cost.” 
It is considered by Officers that this proposal is not capable of contributing towards
‘sustainable development.’  The significant adverse impacts it poses in terms of landscape
and visual impact cannot be considered ‘sustainable.’ It is considered that these adverse
effects outweigh any benefits the proposal could bring. Officers therefore submit that there
can be no presumption in favour of this development in terms of this paragraph of SPP either.
Officers do not consider that the proposal is located in the right place – a view which is
supported by the Council’s landscape consultant and the statutory consultation advice of
NatureScot. 
NPF3 
Renewable energy generation targets are supported by NPF3 but that support is qualified as
mirrored in SPP. It is stated at paragraph 4.7: “The pressing challenge of climate change
means that our action on the environment must continue to evolve, strengthening our longer-
term resilience. A planned approach to development helps to strike the right balance between

Page 40

safeguarding assets which are irreplaceable, and facilitating change in a sustainable way.”
Paragraph 4.4 of NPF 3 recognises that Scotland’s landscapes are spectacular, contributing
to our quality of life, national identity, and visitor economy. Landscape quality is found across
Scotland and all landscapes support place-making. 
National Planning Framework 4 will superseded the provisions of NPF3, once adopted by
Scottish Ministers. 
Revised Draft NPF4 
SPP and NPF3 will be superseded on adoption of National Planning Framework 4 by Scottish
Ministers. The revised draft National Planning Framework 4 was laid before Scottish
Parliament in November 2022. Following a period for consideration by Scottish Ministers, it is
anticipated that the revised draft will be adopted, subject to any changes made by Ministers
agreed through parliamentary processes, as the new principal planning policy and spatial
strategy for Scotland. Given the advanced stage of the policy it is considered it should be
given weight in the decision making process. 
The Spatial Strategy sets out that we are facing unprecedented challenges and that we need
to reduce greenhouse gas emissions and adapt to future impacts of climate change. It sets
out that that Scotland’s environment is a national asset which supports our economy, identity,
health, and wellbeing. It sets out that choices need to be made about how we can make
sustainable use of our natural assets in a way which benefits communities. The spatial
strategy reflects legislation in setting out that decisions require to reflect the long term public
interest. However in doing so it is clear that we will need to make the right choices about where
development should be located ensuring clarity is provided over the types of infrastructure that
needs to be provided and the assets that should be protected to ensure they continue to
benefit future generations. The Spatial Priorities support the planning and delivery of
sustainable places, where we reduce emissions, restore, and better connect biodiversity;
liveable places, where we can all live better, healthier lives; and productive places, where we
have a greener, fairer, and more inclusive wellbeing economy. 
It is anticipated that national developments, of which Strategic Renewable Electricity
Generation (developments of over 50MW) is one, will assist in the delivery of the Spatial
Strategy and Spatial Priorities. The Spatial Strategy considers that Argyll & Bute can continue
to make a strong contribution toward meeting our ambition for net zero. It considers that the
strategy for Argyll & Bute aims to protect environmental assets and stimulate investment in
natural and engineered solutions to climate change. 
The type of development subject to this application is identified generically as a national
development of “Strategic Renewable Electricity Generation” given it has the capacity to
generate and store more than 50MW. There is in principle support for national scale
developments as they have been identified of national importance in the delivery of Scotland’s
Spatial Strategy. However, any project identified as a national development requires to be
considered at a project level to ensure all statutory tests are met. This includes consideration
against the provisions of the Development Plan, of which National Planning Framework 4 is a
part. 
NPF4 - Policy 11: Energy supports renewable energy development. NPF4 requires significant
weight to be given to the global climate and nature crises. However, a balance still requires to
be struck in terms of the impact of development. Policy 11: Energy sets out that development
proposals for all forms of renewable energy (including wind farms) will be supported. This
policy continues to set out that proposals will only be supported where they maximise net
economic impact. Applications are required to demonstrate how, through project design and
mitigation, the impact on a range of considerations has been addressed. This allows for

Page 41

consideration of matters related to: impacts on communities and individual dwellings in relation
to amenity; landscape and visual impact; public access; aviation and defence interests;
telecommunications; traffic; historic environment; biodiversity (including birds); impacts on
trees; decommissioning; site restoration; and cumulative effects. 
While the weight to be given to each of the considerations in Policy 11: Energy is a matter for
the decision maker, NPF4 is clear that significant weight will require to be placed on the
contribution of the proposal to renewable energy generation targets and on greenhouse gas
emission reduction targets. In relation to landscape and visual impacts it advises that where
impacts are localised and / or appropriate design mitigation has been applied such effects will
generally be considered acceptable. However NPF4 must be read as a whole and detailed
consideration given to linked policies. Policy 4 (Natural Places) – sets out that development
proposals which by virtue of type, location or scale will have an unacceptable impact on the
natural environment will not be supported. 
The revised draft National Planning Framework 4 provides in principle support for wind energy
developments and significant weight must be given to the development that addresses the
global climate emergency and nature crises. This is not however blanket support without
qualification. In considering the appropriateness of the development, while significant weight
has been given to these matters, the significant adverse Landscape & Visual Impact (including
cumulative) is considered to outweigh the benefits of the development in relation to
contribution towards energy targets, and limited socio-economic benefits. 
The Scottish Energy Strategy (SES)  (2017)  and SES Position Statement (2021) – The SES
was published in December 2017 and sets out the Scottish Government’s strategy through to
2050, marking a ‘major transition’ over the next 3 decades in terms of energy management,
demand reduction and generation. The SES sets 2 new targets for the Scottish energy system
by 2030: The equivalent of 50% of the energy for Scotland’s heat, transport, and electricity
consumption to be supplied from renewable sources; and an increase by 30% in the
productivity of energy use across the Scottish economy. The SES recognises that reaching
the 50% target by 2030 ‘will be challenging’ but the target demonstrates ‘the SG’s commitment
to a low carbon energy system and to the continued growth of the renewable energy sector in
Scotland’. These energy and climate change goals mean that onshore wind must continue to
play a vital role in Scotland’s future – helping to decarbonise our electricity, heat, and transport
systems, boosting our economy, and meeting local and national demand. The Statement goes
on to state that: ‘This means that Scotland will continue to need more onshore wind
development and capacity, in locations across our landscapes “where it can be
accommodated”’. The 2021 Position Statement states that: “The Scottish Government is
committed to supporting the increase of onshore wind in the right places to help meet the
target of Net Zero.” 
Onshore wind policy statement (2022) - the Scottish Government published the Onshore Wind
Policy Statement 2022 in December 2022. In regard to Landscape & Visual Amenity and
National Planning Framework 3 (NPF4) (3.6) this document states that: 
“Meeting our climate targets will require a rapid transformation across all sectors of our
economy and society. This means ensuring the right development happens in the right place.
Meeting the ambition of a minimum installed capacity of 20 GW of onshore wind in Scotland
by 2030 will require taller and more efficient turbines. This will change the landscape…We laid
our Revised Draft National Planning Framework 4 (NPF4) in the Scottish Parliament on 8
November, signalling support for all forms of renewable, low-carbon and zero emission
technologies, and making clear that LDPs (Local Development Plan) should seek to realise
their area’s full potential for electricity and heat from renewable, low carbon and zero emission
sources. The only areas where wind energy is not supported are National Parks and National
Scenic Areas. Outside of these areas, the criteria for assessing proposals have been updated,

Page 42

including stronger weight being afforded to the contribution of the development to the climate
emergency, as well as community benefits…..Our Revised Draft NPF4 recognises that
significant landscape and visual impacts are to be expected for some forms of renewable
energy, and makes clear that where impacts are localised and/or appropriate design mitigation
has been applied, they will generally be considered to be acceptable….Subject to
parliamentary approval, and adoption by Scottish Ministers, NPF4 will form a part of the
statutory development plan meaning its provisions will be directly applied in local development
planning and decisions on planning applications” 
The first paragraph of the conclusion states that: “Deployment of onshore wind is mission-
critical for meeting our climate targets. As an affordable and reliable source of electricity
generation, we must continue to maximise our natural resource and deliver net-zero in a way
that is fully aligned with, and continues to protect, our natural heritage and native flora and
fauna.” 
Having due regard to the above it is considered that the proposal  is inconsistent with
the provisions of: SPP; NPF3, Revised Draft NPF4; the Scottish Energy Strategy 2017;
and Onshore Wind Policy Statement 2017 which represent the Scottish Governments
most up to date position on this type of development. 
X. CONCLUSION & RECOMMENDATION 
The Scottish Government gives considerable commitment to renewable energy and
encourages Planning Authorities to support the development of wind farms where they can
operate successfully in appropriate locations. This project has the potential to contribute to
combating the climate emergency through an additional 90 - 100MW of renewable energy
capacity towards Scottish Government targets. In reaching the recommendation to object to
this proposal, Officers have had regard to relevant National and Local Policy and guidance;
the EIAR and other supporting documents; the advice of key consultees; and the material
consideration raised in the representations. It has been concluded that notwithstanding those
factors which weigh positively in the balance of considerations, the significant adverse
Landscape and Visual Impact (including cumulative) would significantly and demonstrably
outweigh the benefits of the development and would therefore be unacceptable. As referred
to above “the aim is to achieve the right development in the right place,” there is not a policy
expectation that an adverse impact on the local environment should be accepted as the price
to pay for the ability to satisfy Scotland’s energy needs and UK climate change commitments.
The natural environment also requires to be seen as a finite resource worthy of protection. It
must be recognised that such support should only be given where justified.