Democracy Spraffa

Appendix 1 - Community School of Auchterarder ISP Consultation Report

Perth and Kinross Council · 27 May 2026
Back to Learning and Families Committee — 27 May 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

PKC - GENERAL
Appendix 1 
PERTH AND KINROSS COUNCIL 
EDUCATION AND LEARNING 
CONSULTATION REPORT 
REPORT ON THE OUTCOME OF THE CONSULTATION RELATING TO
THE PROPOSAL TO: 
Permanently establish a new Intensive Support Provision in Community
School of Auchterarder for pupils with Additional Support Needs with
effect from August 2026. 
This Consultation Report has been issued by Perth and Kinross Council in accordance with
the Schools (Consultation) (Scotland) Act 2010.

Page 2

2 
PKC - GENERAL
Contents 
Page 
1. INTRODUCTION         4 
2. BACKGROUND         4 
3. CONSIDERATIONS        5         
4. REASON FOR FORMULATING THE PROPOSAL    6 
5. SCHOOL INFORMATION        6          
6. THE CONSULTATION PROCESS      7      
7. THE PUBLIC MEETING        8        
8. RESPONSES TO THE CONSULTATION EXERCISE   8 
9. EDUCATION AUTHORITY RESPONSE TO WRITTEN AND ORAL         10   
REPRESENTATIONS         
10. HMIE REPORT                   11 
11.  ALLEGED OMISSIONS OR INACCURACIES     14   
12.  COMPLIANCE WITH SECTION 9(1) OF THE SCHOOLS   14 
(CONSULTATION) (SCOTLAND) ACT 2010   
13.  LEGAL ISSUES         15    
14.  PERSONNEL IMPLICATIONS       15       
15.  CONCLUSION         16         
16.   RECOMMENDATIONS        17

Page 3

3 
PKC - GENERAL 
Appendices 
Page 
Appendix 1 Minute of Public Meeting of 18 November 2025    19        
Appendix 2  Summary of Consultation Responses     23          
Appendix 3  HMIE Report         31

Page 4

4 
PKC - GENERAL
PERTH AND KINROSS COUNCIL 
EDUCATION AND LEARNING 
This report has been prepared following consultation on the proposal that the Council: 
Permanently establish a new Intensive Support Provision in Community School of
Auchterarder for pupils with Additional Support Needs with effect from August 2026.
Having had regard (in particular) to: 
(a) Relevant written representations received by the Council (from any person) during
the consultation period; 
(b) Oral representations made to it (by any person) at the public meetings held on 
18 November 2025 
(c) HMIE’s report on the proposal. 
1. INTRODUCTION 
This is a consultation report prepared in compliance with the Schools (Consultation)
(Scotland) Act 2010 on the above proposal. 
1.1 The purpose of this report is to: 
• Provide a record of the total number of written responses made during the Statutory
Consultation period; 
• Provide a summary of the written responses; 
• Provide a summary of oral representations made at the public meeting held on 18
November 2025;
• Provide a statement of the Council’s response to those written and oral
representations; 
• Provide the full text of HMIE’s report and a statement of the Council’s response to
this report; 
• State how the Council reviewed the above proposal following the representations
received during the Statutory Consultation period and the report from HMIE; and 
• Provide details of any omission from, or inaccuracy in, the Proposal Paper and
state how the Council acted upon it. 
2. BACKGROUND 
2.1 The Learning and Families Committee on 29 January 2025 approved a report (Report
No. 25/19 refers) on an Options Appraisal for the expansion of Intensive Support
Provisions (ISPs) in Perth and Kinross Council primary and secondary schools.  The
Committee agreed to commence with an expansion of ISPs through three phases over
a three-year period.

Page 5

5 
PKC - GENERAL
In preparation of Phase 2, the Learning and Families Committee approved Report
25/214 on Wednesday 27 August 2025, which proposed to establish a new Intensive
Support Provision (ISP) in the Community School of Auchterarder. This report
presented an Options Appraisal following an assessment of building capacity. 
2.2 In the report considered by the Learning and Families Committee on 27 August 2025, it
was agreed that the Strategic Lead: Education and Learning (Chief Education Officer)
commenced a statutory consultation in respect of the permanent establishment of a
new Intensive Support Provision in the Community School of Auchterarder for pupils
with Additional Support Needs with effect from August 2026. 
2.3 The duties in undertaking a statutory consultation on a relevant school proposal are
outlined in the Schools (Consultation) (Scotland) Act 2010 and the accompanying
Statutory Guidance. 
2.4 Learning and Families Committee reports and the Proposal Paper referred to above
are available on the Council’s website www.pkc.gov.uk. 
3. CONSIDERATIONS 
3.1 The main considerations relating to the proposal are fully explained in the Proposal
Paper, and the main points are highlighted as follows:
3.2 Perth and Kinross Council is dedicated to fostering a community where everyone can
thrive, free from poverty and inequality.  Their vision focuses on making the best use of
public resources and ensuring continuous improvement of services. The Council's
Corporate Plan emphasises collaboration to achieve key priorities, including tackling
poverty, addressing climate change, and supporting sustainable places.  Perth and
Kinross Council aims to create a resilient, stronger, and greener local economy; enable
children and young people to reach their full potential; protect and care for the most
vulnerable; and support physical and mental wellbeing.  By working in partnership with
communities, they strive to create vibrant and successful areas, safe and sustainable
environments, and educated and responsible citizens, ensuring every child has the
best start in life.
3.3 Perth and Kinross Council’s Corporate Plan aims to tackle poverty, address climate
change, and support sustainable places.  This vision is further supported by the
Council’s Learning Estate Management Plan and the Education and Learning Policy
Framework Maximising Resources, which aim to enhance the range and quality of
learning experiences for all. 
3.4 Councils have a statutory duty in terms of the Education (Scotland) Act 1980 to make
adequate and efficient provision of school education across their entire area for the
current school population and future pattern of demand.   
3.5 Councils also have a statutory responsibility in terms of the Local Government in
Scotland Act 2003 to achieve best value.  To achieve best value and optimum
efficiency, the organisation of the school estate is therefore kept under regular review,
including the need for school provision and other factors, such as altering catchment
areas.

Page 6

6 
PKC - GENERAL
3.6 The Schools (Consultation) (Scotland) Act 2010 provides a strong,
accountable statutory consultation process that local authorities must apply to their
handling of all proposals of major changes to schools.  These consultation processes
are expected to be robust, open, transparent and fair, and seen to be so. They are also
expected to be consistent across Scotland.  
3.7 The Education (Scotland) Act 2016 amends the Standards in Scotland’s Schools Act
2000 by adding in new duties to address inequality of outcome.  These duties apply in
different ways to both Scottish Ministers and Education Authorities.  Where the
Education Authority is making or implementing strategic decisions about school
education, it is required to have due regard to the need to carry out its functions in a
way which is designed to reduce inequalities of outcome.  This is particularly directed
in the Act towards pupils who experience those inequalities through socio-economic
disadvantage, but there is also a power to extend the range of pupils who are covered
by this duty. 
4. REASON FOR FORMULATING THE PROPOSAL 
4.1 The proposal to permanently establish an Intensive Support Provision (ISP) at
Community School of Auchterarder has been formulated in response to a growing and
clearly evidenced need for enhanced local provision for pupils with complex and
multiple Additional Support Needs (ASN) within the Community School of Auchterarder
catchment area. 
4.2     Currently, Community School of Auchterarder does not have an ISP in the primary or
secondary stages.  Young people requiring this level of support must travel to other
schools within Perth and Kinross to access appropriate education.  This results in
longer travel times, reduced access to local community resources, and potential impact
on social and emotional wellbeing due to separation from peers and familiar
environments. 
4.3      Perth and Kinross Council has a legal obligation under the Education (Scotland) Act
1980 and the Education (Additional Support for Learning) (Scotland) Act 2004 to
provide adequate and efficient education, including for those with ASN.  The proposal
aligns with these responsibilities and supports the Council’s commitment to inclusive
education. 
4.4     As of September 2025, 43.5% of children and young people in Perth and Kinross
schools have ASNs, with a significant number presenting with complex needs. The
capacity of the existing ISP network is under pressure, and the establishment of a new
ISP at Community School of Auchterarder will help meet current and projected
demand. 
4.5     The proposal supports the Council’s aim to reduce inequalities of outcome, particularly
for pupils affected by socio-economic disadvantage or disability, as outlined in the
Education (Scotland) Act 2016. Providing a local ISP ensures equitable access to high-
quality education and support for children and young people requiring special
education.

Page 7

7 
PKC - GENERAL
4.6 It is intended that the new ISP will utilise spaces within the school building that are
already specialist-designed classrooms and areas tailored to meet the needs of young
people with ASN. 
5. SCHOOL INFORMATION 
5.1 Community School of Auchterarder is located on New School Lane, Auchterarder             
PH3 1BL. The school provides all-through education from nursery to secondary  
level for both girls and boys, with capacity for 1,313 pupils and an enrolment of 913
pupils as at January 2026. 
6. THE CONSULTATION PROCESS 
6.1 A link to the Proposal Paper was issued by letter to those individuals and bodies listed
under Distribution within the document.  The Proposal Paper was also published on the 
Council’s website: www.pkc.gov.uk   
6.2     The Proposal Paper informed consultees that the consultation period would run from
Wednesday 5 November 2025 until close of business on Friday 19 December 2025,
which includes a period of 31 school days.  
6.3     The proposal on which consultation took place was to:
• Permanently establish a new Intensive Support Provision in Community
School of Auchterarder for pupils with Additional Support Needs with
effect from August 2026. 
6.4     The requirements for consulting on a relevant proposal relating to schools are set out in
the Schools (Consultation) (Scotland) Act 2010. In accordance with these
requirements: 
• A Proposal Paper was published on 5 November 2025. All statutory consultees
were written to, providing a link to the proposal paper and details of where and
how to obtain a paper copy. A copy of the document was available free of charge
to the consultees listed within the document.
• The Proposal Paper was published on the Perth and Kinross Council
website and was available in paper copy upon request.
• A public meeting was held to discuss the proposal on Tuesday 18 November
2025 at Community School of Auchterarder.
• The consultation period ended on Friday 19 December 2025.
• HMIE’s involvement consisted of receiving the options appraisal and proposal
paper documents, attending the public meeting, and a visit to the school, which
included engaging with relevant consultees. They also received a copy of all
online and written representations and the minutes of the public meeting. HMIE
then prepared a report on the educational aspects of the proposal, which is
attached as Appendix 3. 
6.5      The following school is directly affected by the proposal: 
• Community School of Auchterarder

Page 8

8 
PKC - GENERAL
The parents and pupils who are expected to attend the affected school within 2 years
at the following schools may also have an interest in the proposal and were consulted:
• Aberuthven Primary School
• Blackford Primary School
• Dunning Primary School 
6.6 In accordance with statutory requirements and good practice, the following persons
were consulted: 
• The parents of the pupils and children at the affected school
• The parents of children expected to attend the affected school within 2 years of  
the date of publication of this proposal document
• The Parent Council of the affected schools
• Pupils at the affected school
• The teaching and support staff at the affected school
• The trade union and professional association representatives of the above staff
• The Community Council
• Relevant users of the affected school
• Elected Members of Perth and Kinross Council
• HMIE 
6.7 The number of letters issued with details of the Proposal Paper was 1257. 
6.8 During the consultation period, representations were sought from interested parties,
either in oral or written form or electronically.  An online response form and generic
email account was set up by the Council to receive representations and enquiries on
the proposal. 
6.9 This Consultation Report is the Council’s response to the issues raised during the
consultation period on the Proposal Paper. 
6.10 This Consultation Report is to be published on the Council’s website for a period of no
less than three weeks prior to final consideration by Learning & Families Committee on
27 May 2026 
7        THE PUBLIC MEETING 
7.1 A public meeting was held in Community School of Auchterarder on Tuesday 18
November 2025. Seventeen members of the public attended.  A full note of the
meeting is attached as Appendix 1 which details the questions and issues raised at the
meeting. 
8        RESPONSES TO THE CONSULTATION EXERCISE 
8.1      A total of 13 online response forms were received during the statutory consultation
period.  Of these, 7 responses agreed with the Council’s proposal to establish an
Intensive Support Provision (ISP) at Community School of Auchterarder, while 6
responses disagreed.   Written representations were also invited from statutory
consultees and interested parties.

Page 9

9 
PKC - GENERAL
Seven written responses were received.  One response agreed with the proposal and
6 responses agreed in principle with the proposal to establish a local ISP but had
concerns and questions about the published proposal. 
Consultation was also undertaken with children and young people, including pupils at
Community School of Auchterarder and P1–P7 pupils across all associated primary
schools, between 1 and 19 December 2025.  In total, 159responses were received
from secondary pupils (132 individual responses, 21 class responses and 6 group
responses supported by an adult). The majority of respondents (121) indicated they
had no concerns about ISP classes being located within their school, and 99 pupils felt
that the proposed ISP would not change their school day. 
Details of respondents and the issues raised are contained within the Summary of
Consultation Responses, attached as Appendix 2. 
8.2      In summary, the oral and written responses and questions can be grouped broadly as
follows: 
Many respondents expressed support for having an Intensive Support Provision (ISP)
at the Community School of Auchterarder, recognising the benefits of local specialist
provision.  However, the majority of responses, both written and during the public
meeting, also raised concerns about the proposed location of the ISP.   
Positives Identified
• Strong support for establishing an ISP locally, reducing long travel times and
enabling children to attend education provision closer to home. 
• Recognition that an ISP would increase fairness and access for pupils with
complex ASN within the Auchterarder catchment. 
• Support from pupils who identified benefits such as increased inclusion, new
friendships, reduced travel, and calmer spaces for children who need them. 
• Acknowledgement of educational benefits outlined by the Council, including
targeted support, specialist staffing and structured environments. 
• Support in principle from several respondents who agreed a new ISP is
necessary within PKC, although not necessarily in the proposed form. 
Questions Asked
• Facilities & Infrastructure: Questions about why the ISP is proposed for the
first floor, including concerns regarding evacuation, accessibility, outdoor sensory
access and movement through busy areas, as well as whether the school has
sufficient space, specialist rooms and quiet areas to accommodate both the ISP
and existing provision.
• Education & Staffing: Questions about whether staffing for the ISP will be
additional and would not reduce existing ASN or Support for Learning (SfL)
support, whether recruitment and training can be completed in time, and what
contingency measures are in place if difficulties arise.
• Operations & Management: Questions regarding the timeline, including the
readiness of building works, transitions and room relocations, and how
movement and supervision will be safely managed within a busy campus.
• Governance & Communication: Questions seeking clarification on eligibility,
placement decisions, and whether pupils currently attending other ISPs can
remain where they are, alongside requests for transparency on alternative site
options and the reasons they were not selected.

Page 10

10 
PKC - GENERAL          
Overview of Concerns
• Concerns that the first‑floor location is unsuitable due to safety, evacuation
challenges, lack of direct outdoor access and the need for pupils to move
through busy areas. 
• Risk that establishing the ISP may reduce existing ASN and SfL support,
particularly if staffing or resources are reallocated. 
• Widespread worry about school capacity, including the loss of specialist rooms
and the potential effect of relocating departments. 
• Concerns about disruption to mainstream learning, including timetabling, access
to specialist accommodation and exam arrangements. 
• Ongoing issues with limited outdoor space, with fears that creating a dedicated
ISP area may worsen inequalities across the wider school. 
• Concerns that the timeline is tight, with risks around recruitment, building
readiness and transition planning.
8.3      In summary, 1257 letters were issued to consultees inviting participation in the
statutory consultation. A total of 13 online response forms were received, of which 7
agreed with the proposal and 6 disagreed.  Seven written representations were
submitted, including one in agreement and six expressing support in principle while
raising concerns.  A public meeting was held on 18 November 2025, attended by 17
members of the public, where oral representations and questions were recorded. Full
details of the responses and feedback are provided at Appendix 1. 
9          EDUCATION AUTHORITY RESPONSE TO WRITTEN AND ORAL            
REPRESENTATIONS 
9.1 Why is the ISP proposed for the first floor, and how will issues relating to safety,
evacuation, accessibility, movement through busy areas and access to outdoor
sensory space be addressed?
In response to concerns raised during the Statutory Consultation, the Council
undertook a further detailed review of the proposed first‑floor location for the ISP and a
comprehensive reassessment of the building layout was undertaken.  As a result, the
decision was made to relocate the ISP to the ground floor, using the space currently
occupied by the school library. The library will move to the first floor, where the ISP had
originally been proposed to be located.
9.2 Does the school have sufficient capacity, including specialist rooms and quiet
spaces, to accommodate the ISP without negatively impacting existing
provision? 
Yes. The Proposal Paper confirms that Community School of Auchterarder has
sufficient overall capacity to accommodate the ISP without reducing mainstream
provision or specialist learning spaces.
The school’s occupancy level is currently around 70%, with both the primary (81.7%)
and secondary (61.7%) sectors operating below maximum capacity. This indicates that
the school has the physical space required to host additional classrooms and
associated accommodation.

Page 11

11 
PKC - GENERAL
The ISP will be specially designed, in line with the specification set out in the Proposal
Paper, to create an appropriate, purpose-built environment for pupils with complex and
multiple needs. 
The ISP accommodation will include two ASN classrooms, a shared sensory room, a
shared life skills room, a personal care/medical room and a dedicated outdoor area for
ISP pupils.  These spaces are intended to provide a high-quality learning environment
tailored to sensory, emotional and curricular needs. 
9.3 Will ISP staffing be fully additional, and how will the Council ensure that
recruitment, training and planning do not reduce existing ASN or Support for
Learning support? 
The ISP will have its own dedicated staffing team. The provision will be staffed by a
Principal Teacher, class teachers, and Pupil Support Assistants, forming a specialist
team designed specifically to meet the needs of children requiring intensive support.
These posts are in addition to the support staffing already in post.  
Recruitment for these posts is undertaken in conjunction with the Inclusion Service to
ensure high‑quality specialist appointments. Each role has a specific job description,
designed to attract practitioners with the appropriate experience, knowledge, and
understanding of children with complex additional support needs. 
9.4 What is the planned timeline for building works, transitions and room
relocations, and how will pupil movement and supervision be safely managed
across a busy campus? 
Following review of feedback gathered through the Statutory Consultation, the Council
reassessed the proposed accommodation for the ISP.  As a result of this review, the
ISP will now be located on the ground floor, with associated relocations of the Support
for Learning (SfL) Department and the school library.  This change in layout requires a
longer period of building works than originally anticipated, to ensure that each area is
designed and delivered to the required standard.
The revised programme of works will include:
• Relocating the Support for Learning Department into the main secondary
building.  It is important to note that this move had already been planned to
strengthen inclusion and improve direct access to teaching areas for secondary
pupils.
• Relocating and redesigning the school library on the first floor, in the space
previously identified for the ISP.
• Creating the specially designed ISP accommodation on the ground floor,
including access to dedicated outdoor and garden spaces.
Due to the scale and sequencing of these works, the ISP will not be able to open within
the Community School of Auchterarder building for August 2026.  Instead, it is planned
that the Community School of Auchterarder ISP will be temporarily hosted within an
alternative primary school setting, supporting a small group of primary‑aged children.
This will ensure that pupils who require intensive support can begin accessing the
provision without delay, while construction works continue at Community School of
Auchterarder.

Page 12

12 
PKC - GENERAL
It is anticipated that the new ISP accommodation at Community School of
Auchterarder will be ready to open in August 2027, with staff and pupils transitioning
into the completed setting as soon as it is safe and appropriate to do so.
Recruitment for the ISP will proceed to the original timeline.  Staffing will be in post for
August 2026, ensuring that the team is established ahead of opening in the temporary
site.  A Principal Teacher will be appointed for June 2026, allowing sufficient time to
lead transition planning, coordinate across the temporary and permanent sites, and
support families and pupils through the transition process.
Movement and supervision across the busy campus will be systematically planned as
part of the wider programme of building works.  Locating the ISP on the ground floor
will significantly reduce movement through high‑traffic areas and allow pupils direct
access to outdoor space, enhancing safety and supporting regulation.
9.5 What are the eligibility criteria for ISP placement, can pupils currently attending
other ISPs remain where they are, and what alternative site options were
considered and discounted?
Eligibility for an ISP placement is based on a child’s assessment profile clearly
demonstrating a requirement for intensive-level support, where all interventions
available through the Staged Intervention Framework have been fully implemented,
reviewed and shown to be insufficient to meet the child’s needs.  As part of this
process, an Educational Psychologist provides professional assessment and analysis,
which forms part of the Child’s Plan submitted to the Transitions Panel.  The
Transitions Panel, a multi-disciplinary group including senior officers, educational
psychology, inclusion staff and school leaders, reviews the full assessment picture to
reach transparent, consistent and equitable decisions about placement.
Children and young people from the Community School of Auchterarder catchment
area who are currently attending an ISP in another locality are not required to move to
the new provision.  Families retain the choice to remain in their existing ISP placement,
ensuring continuity where preferred and maintaining stability for learners already
settled in specialist settings.
Community School of Auchterarder was reviewed alongside other educational settings
within the locality as part of Perth and Kinross Council’s phased expansion of specialist
provision.  It was identified as the most suitable location because the school currently
has sufficient capacity, operating at approximately 70% occupancy, with both the
primary and secondary sectors below capacity, ensuring that the ISP can be
accommodated without impacting mainstream classroom provision.  In addition,
Community School of Auchterarder has space within the existing building that can be
adapted for ASN use, including classrooms, sensory facilities, life‑skills areas and
personal care accommodation. The school’s all‑through structure, providing education
from nursery through secondary, was also a key factor, as it supports continuity of
learning and reduces transitions for children with complex needs.

Page 13

13 
PKC - GENERAL
10. HMIE REPORT 
10.1 In accordance with the Schools (Consultation) (Scotland) Act 2010, a report was
produced by HMIE on the educational aspects of the proposal. The HMIE report is
reproduced in full at Appendix 3. 
10.2 The purpose of the report is to provide an independent and impartial consideration of 
Perth and Kinross Council’s proposal to permanently establish an ISP at Community
School of Auchterarder for pupils with complex Additional Support Needs, effective
from August 2026. 
10.3 A HMIE Inspector visited Community School of Auchterarder, the old building, and Inch
View Primary School ISP, attended the public meeting held on 18 November 2025, and
engaged with pupils, parents, staff, and stakeholders. 
The report supports the proposal and is summarised below: 
• Educational Benefits: HM Inspectors agree that the proposal has clear potential to
deliver educational benefits.  Establishing an ISP at Community School of
Auchterarder would provide an appropriate, high‑quality learning environment for
children and young people with multiple and complex needs.  Inspectors note that
the ISP would enhance learning experiences by enabling access to a broad
curriculum across the Broad General Education and Senior Phase, delivered within
a bright, stimulating and safe environment tailored to meet complex ASN needs. 
• HM Inspectors highlight the importance of enabling children and young people with
multiple and complex needs to be educated within their local community, avoiding
the need for long journeys to specialist provision elsewhere.  Children and young
people consulted viewed this positively and felt strongly that pupils should not have
to travel long distances to access appropriate support.
• Almost all stakeholders who met with HM Inspectors, including parents, staff,
children and young people, agree with the proposal and recognise the educational
benefits of establishing an ISP at Community School of Auchterarder.  Parents and
staff consider that, in the longer term, the ISP will help children and young people
reach their potential.  Staff also expressed interest in the ISP and were positive
about its potential to better meet the needs of learners with complex and multiple
needs.
• While supportive overall, stakeholders raised concerns requiring further clarification
from the Council.  These include the originally proposed first‑floor location, access
to outdoor learning space, staffing ratios, and practical access issues such as
parking and drop‑off arrangements.  HM Inspectors agree that the Council should
address these concerns as part of the next stages of planning and implementation. 
10.4 Perth and Kinross Council Response to Education Scotland’s Report 
The Council welcomes the report from HMIE and accepts its findings. 
In response to the findings contained within the HMIE report, Perth and Kinross
response is as follows: 
10.5 HMIE Inspectors note that stakeholders seek further reassurance regarding the
proposed location of the ISP.

Page 14

14 
PKC - GENERAL 
Perth and Kinross Council recognises the concerns raised by stakeholders regarding
the originally proposed first‑floor location of the ISP.  Feedback gathered through the
Statutory Consultation, and highlighted by HMIE Inspectors, made clear that families,
staff and young people sought further reassurance about the suitability of this location,
particularly in relation to accessibility, movement, evacuation and access to outdoor
learning space. 
In response, the Council undertook a further detailed review of available
accommodation within the Community School of Auchterarder.  As a result of this
review, the ISP will now be located on the ground floor rather than the first floor. 
This revised location provides improved accessibility for pupils with complex and
multiple needs, removes dependency on stairs or lifts, and ensures direct access to
outdoor space, which HMIE identified as an important consideration for learning and
wellbeing. 
The Council will continue to work closely with school staff, property services and the
ISP design team to ensure the final layout fully aligns with the needs of the children
and young people who will access the provision, thereby addressing the concerns
highlighted by HMIE and the wider school community. 
10.6 HMIE Inspectors highlight the need for clarity regarding staffing arrangements
within the ISP. 
In response, the Council confirms that the ISP will have its own dedicated staffing
team, designed specifically to meet the needs of pupils requiring intensive support. 
The provision will be staffed by a Principal Teacher, class teachers and Pupil Support
Assistants, forming a specialist team with the skills, experience and knowledge
required to support children with complex additional support needs.  These posts are in
addition to the current Support for Learning and ASN staffing already in place within
the school. 
Staffing ratios within the ISP are aligned to Scottish Negotiating Committee for
Teachers (SNCT) guidance, with an indicative ratio of one member of staff to every
four pupils, ensuring that children receive the level of support required to learn safely
and successfully.  This ratio is not fixed, and is reviewed continuously in response to
the individual needs of pupils.  Where a child or group requires additional support, for
example, due to medical, sensory, communication or behavioural needs, the Council
will provide additional staffing to maintain a safe and supportive learning environment. 
10.7 HMIE Inspectors indicate that more information is required about how the
Council will ensure indoor and outdoor learning spaces meet the needs of
children and young people.
In response, and following the move to a revised ground‑floor location, the Council has
ensured that the ISP design now includes direct access to outdoor space, addressing
the concerns raised regarding the original first‑floor proposal.  The new layout provides
immediate access to a safe, enclosed ISP garden space, enabling pupils to benefit
from outdoor learning, sensory regulation and movement breaks without navigating
busy circulation areas. 
Indoor learning spaces will also be designed to provide bright, safe and flexible
environments tailored to complex ASN needs, consistent with the educational benefits
outlined in the proposal.

Page 15

15 
PKC - GENERAL
Quiet areas, sensory‑responsive design features and adaptable layouts will ensure
staff can tailor the environment to individual learners, supporting wellbeing,
communication and engagement. 
The Council will continue to work closely with school staff, property services and ASN
specialists throughout the design and implementation phase to ensure that both indoor
and outdoor environments fully meet the needs identified by HMIE and the wider
school community. 
10.8 HMIE Inspectors note that stakeholders raised questions about how the ISP may
impact the wider school. 
In response, the Council has undertaken a review of the ISP’s location and revised the
proposal to position the ISP on the ground floor.  As part of this change, the ISP will
utilise space within the existing school, ensuring that the provision is appropriately
integrated into the current building layout.  Locating the ISP on the ground floor
reduces movement through busy areas, supports safer and more direct access routes,
and ensures immediate access to outdoor learning and regulation spaces.  These
adjustments directly address the practical concerns identified by HMIE and provide
reassurance that the ISP can be introduced in a way that supports safety, accessibility
and continuity for the wider school community. 
The Council will continue working closely with school leadership, staff, parents and
property services to ensure that the introduction of the ISP is carefully planned and
delivered, minimising disruption and supporting the positive functioning of the whole
school. 
11. ALLEGED OMISSIONS OR INACCURACIES 
11.1 Section (10) (3) of the 2010 Act also places a requirement on the Council to provide
details of any inaccuracy or omission within the Proposal Paper which has either been
identified by the Council or raised by consultees.  This section of the 2010 Act also
requires the Council to provide a statement on the action taken in respect of the
inaccuracy or omission, or, if no action was taken, to state that fact and why.   
11.2 In the course of the consultation exercise, there were no areas identified by
respondents as being inaccurate or omitted from the Proposal Paper during the
consultation period. 
12. COMPLIANCE WITH SECTION 9(1) OF THE SCHOOLS (CONSULTATION)
(SCOTLAND) ACT 2010 
12.1 Section 9(1) of the Schools (Consultation) (Scotland) Act 2010 states that: 
After the Education Authority has received HMIE’s report, the Authority is to review the
relevant proposal having regard (in particular) to: 
(i) written representations received by the Authority (from any
person) during the consultation period;
(ii) oral representations made to it (by any person) at the public
meetings; and
(iii) HMIE’s report.

Page 16

16 
PKC - GENERAL 
12.2 Following receipt of the HMIE report, 13 online representations, 7 written
representations and oral representations made at the one public meeting held during
the consultation period, officers reviewed the proposals. 
12.3 The feedback from the consultation was considered by officers where all the questions
and comments raised were considered in detail.  This ensured that the Council met the
requirements to review the proposal under section 9(1) and 13(5) of the 2010 Act. 
12.4 Officers of the Education Authority have listened carefully to the points made at the
public meeting and have also considered equally carefully the HMIE report and the
online and written representations.  The proposal was reviewed to consider whether
any of the representations led the Council to reconsider other options as being
reasonable alternatives to the proposal.   
12.5 The representations led officers to conclude that there were other reasonable
alternatives to the proposal, and that the proposal should be reconsidered in respect of
the proposed location of the ISP. 
12.6 The educational benefits were reviewed in respect of the HMIE report and
representations made. 
12.7 There were no factors included in the HMIE report or representations made requiring
any aspect of the educational benefits to be reconsidered. 
12.8 Having reviewed the HMIE report and feedback from consultees, officers concluded
that the basis of the original proposal required to be reviewed when establishing a new
Intensive Support Provision (ISP) at Community School of Auchterarder.  The location
of the ISP contained within the original proposal has been amended to take account of
the feedback received during the consultation. This proposal ensures that pupils with
complex additional support needs in the Community School of Auchterarder catchment
area will be able to access specialist education locally, enabling them to maintain
connections with their peers and community. The Council remains committed to
implementing the ISP in a way that enhances existing provision, supports inclusive
practice, and delivers the educational benefits outlined in the proposal paper. 
13.   LEGAL ISSUES 
13.1 The Council has complied in full with the requirements of the Schools (Consultation)
(Scotland) Act 2010 throughout this statutory consultation. 
13.2 The Council is mindful of its duties in respect of equality, and the Equality Impact
Assessment did not identify that any parent, child or young person would be treated
less favourably as a result of this proposal.  The proposed Intensive Support Provision
(ISP) at Community School of Auchterarder will comply with the Council’s Accessibility
Strategy and will positively promote equal opportunities for children and young people
with disabilities.

Page 17

17 
PKC - GENERAL
13.3 In terms of Socio-Economic Impact, the assessment identified that establishing an ISP
within Community School of Auchterarder will improve access to specialist education
for pupils living in the local area, including those who may be economically
disadvantaged.  By reducing the need for long-distance travel to access appropriate
support, the proposal enhances equity and inclusion for families across the community. 
13.4 Under the terms of the Schools (Scotland) (Consultation) Act 2010, it is a legal
requirement that the Council should not reach any formal decision without waiting until
a period of three weeks starting on the day on which this Consultation Report is
published in electronic and printed form has expired. 
13.5 As it is the intention that this Consultation Report should be published, both
electronically and in written form, if required, on 22 April 2026, this meets the statutory
requirement to publish this report for more than three weeks before consideration of
the proposal by Learning & Families Committee on 27 May 2026. 
14. PERSONNEL IMPLICATIONS 
14.1 Staffing arrangements for the new Intensive Support Provision (ISP) at Community
School of will be consistent with Perth & Kinross Council’s Staffing Standard and other
relevant local agreements. 
14.2 Consultation will be undertaken with school staff, Trade Unions, and professional
associations where appropriate, to support the implementation plan for staffing the ISP.
This will ensure that the provision is appropriately resourced and that staff are
supported in delivering high-quality education for pupils with complex additional
support needs. 
15.  CONCLUSION 
15.1 The Council now has 4 broad options to consider, namely: 
(a)  adopt the proposal. 
(b)  withdraw the proposal.   
(c)  amend the proposal in some way which allows the proposal to proceed; or
(d)  amend the proposal significantly and undertake a further consultation exercise
on a new proposal. 
15.2 HMIE has identified that the proposal to establish a new Intensive Support Provision
(ISP) at Community School of Auchterarder has clear educational benefits.  The ISP
has the potential to provide a high-quality learning environment for young people with
complex additional support needs.  The proposed design and location within the school
will offer flexible learning and social spaces tailored to individual needs.  Stakeholders
recognise the value of the ISP to the local community, particularly in enabling pupils to
be educated closer to home, maintain peer relationships, and access specialist support
within a mainstream setting.  HMIE Inspectors agree that the ISP will enhance inclusive
practice and support improved outcomes for young people. 
15.3 If the Council adopts the proposal, it is understood that the educational benefits set out
in the Proposal Paper would likely materialise.

Page 18

18 
PKC - GENERAL 
15.4 The key points that have been highlighted during the consultation period are as
follows: 
• HMIE’s report confirms that the proposal to establish an Intensive Support Provision
(ISP) at Community School of Auchterarder presents positive educational benefits.
These include the creation of a high-quality learning environment tailored to the
needs of young people with complex additional support needs, with opportunities
for inclusion in mainstream activities and reduced travel time for pupils.  The
provision is expected to strengthen peer relationships and community connections
by enabling pupils to be educated locally. 
• HMIE Inspectors highlighted that, while the proposal was broadly welcomed, the
Council should continue to engage with parents and staff to address concerns
about the location of the ISP, access to outdoor learning space, staffing
arrangements, and parking and drop‑off at the school. 
• Stakeholders raised questions about the originally proposed first‑floor location, the
need for flexible and appropriate indoor and outdoor learning spaces, and sought
clearer information regarding staffing arrangements and safe access to the school,
including parking and drop‑off.  HMIE noted these concerns and recommended that
the Council provide further clarification. 
• The proposal received overall support from stakeholders, with HMIE reporting that
almost all stakeholders they met agreed with the proposal and recognised its
educational benefits.  The consultation summary shows a mixed response to the
online survey (7 agreeing and 6 disagreeing), but written representations and public
meeting feedback indicated support in principle, alongside concerns about location,
space, staffing and access which consultees asked the Council to address. 
15.5 The Council has amended its proposal to reflect the feedback received during the
consultation regarding the location of the ISP in Community School of Auchterarder, to
allow the proposal to proceed. 
16. RECOMMENDATIONS 
16.1 On the basis of the feedback received and responses provided, and taking account of
the educational and social benefits of the proposal, it is recommended that the Council
approves: 
• To permanently establish a new Intensive Support Provision in Community School
of Auchterarder for pupils with Additional Support Needs with effect from August
2026.  Community School of Auchterarder ISP classes will be hosted in existing
ISPs from August 2026, with an expectation of transitioning to the newly
constructed ISP at Community School of Auchterarder by August 2027. 
David Macluskey 
Strategic Lead: Education & Learning (Education Chief Officer)
21 April 2026

Page 19

19 
PKC - GENERAL            
Appendix 1 
Education & Children’s Services 
Improving Lives Together
Ambition I Compassion I Integrity 
Statutory Consultation Public Meeting 
Minute of meeting held on Tuesday 18 November 2025
at 7:00p.m. in Community School of Auchterarder 
Panel: 
David Macluskey   Education & Learning Strategic Lead 
(Chief Education Officer)  
Fiona MacKay Quality Improvement Manager – 
Inclusion & Additional Support Needs 
Sarah Stephen   Quality Improvement Officer - Inclusion 
Samantha O'Mahoney-Magee Depute Head Teacher – Support (Acting)
Community School of Auchterarder
Karen Robertson   Service Manager – Business Services 
Present: 
Jaclyn Meikle – Minutes  ASN Transformation Programme Manager 
Councillor John Rebbeck  Convenor, Learning & Families Committee 
In addition:
2 x CSoA DHT
1 x Education Scotland Representative
17 x Parents / Members of the public 
Welcome and Introductions 
David Macluskey opened the meeting and welcomed the members of public in attendance to
the Statutory Consultation Public Meeting.   
David introduced himself and the panel to the members of the public and thanked them for
attending. 
Samantha O'Mahoney-Magee introduced herself and briefly outlined the positive impact she
anticipated that an ISP would have for the Community School of Auchterarder. 
Format of meeting
Fiona MacKay then explained the agenda the meeting would follow.
The proposal
Fiona MacKay explained the consultation proposal to the attendees. The Council proposes to:

Page 20

20 
PKC - GENERAL
• Permanently establish a new Intensive Support Provision at Community School of
Auchterarder for pupils with Additional Support Needs with effect from August 2026.
Presentation
A presentation was provided that explored the proposal in further detail and explained the
background to the proposal and the reasons a new ISP is required. The presentation to be
available on the PKC website following the public meeting. 
Fiona MacKay outlined:
• The PKC Vision
• Statutory duties of a local authority
• PKC & National ASN Data
• Explained the 4 levels of Staged Intervention (4-Intensive)
• The existing geographic spread of ISPs within PKC
• The requirement for an ISP at CSoA
Sarah Stephen outlined:
• What is an ISP
• Common profile of needs seen within an ISP
• How needs are met
• The placement of the ISP within the school and what it will include
• How the ISP will operate
• How the ISP will be staffed
• The educational benefits of an ISP
Karen Robertson outlined:
The statutory consultation process including the legal framework, consideration by Learning &
Families Committee, the statutory consultation period and the different ways in which
representations from interested parties could be made as the first part of the consultation
process. Karen Robertson then explained the next stages of the process which includes the
involvement of Education Scotland, the preparation and publication of the consultation report
and the final decision made by the Learning & Families Committee, currently anticipated to be
May 2026. 
Fiona Mackay closed the presentation by directing attendees to the PKC website for additional
information.
David Macluskey opened the meeting to any questions, comments or observations from the
floor:
Q) If a child currently attends an ISP out with their catchment and does not want to
return, will PKC continue to cover travel costs if the new ISP at CSOA is agreed?
A) Yes. There is no expectation for children who are already in placement elsewhere to move,
although that option will be available to them. Existing arrangements remain in place, and
decisions will be based on personal choice.

Page 21

21 
PKC - GENERAL
Q) With the increase in children recorded with ASN, will the number of classrooms
planned be sufficient?
A) The design has been future proofed as far as possible within available resources and
budget, following future scoping. While we cannot guarantee certainty over 10–15 years, the
Staged Intervention Framework ensures needs are met in the least intrusive way, supporting
as many children to remain in mainstream schools as possible. The ISP is specialist
provision, and PKC is confident it will meet foreseeable needs. Although ASN numbers are
rising nationally, pupils requiring intensive-level support remain relatively static. Pupils
supported at lower stages of the intervention framework will not impact ISP capacity. Some
current placements will age out, and forecast numbers for opening are around half capacity,
leaving flexibility. We will monitor and adjust as required.
Q) If the statutory consultation report goes to Committee in May, will there be enough
time for summer works, recruitment, and transition?
A) Committee approval is required first, which affects timelines. Once feedback is fully
gathered from the statutory consultation process, we will have a clearer picture of
requirements. Recruitment will be targeted for Term 3, aiming for key staff to be in place for
Term 4. Mitigations will be planned in case of recruitment challenges. Pupils will have
opportunities to visit, and videos will support transition. While timelines are tight, this is
preferable to delaying until 2027, which would have greater anticipated impact on children.
Perth High School successfully managed similar challenges when opening its new ISP in
August at the same time as moving to a brand-new school building. 
Q) Will there be interim placements for pupils who need more than mainstream but not
ISP?
A) ‘Intensive’ support is highly specialist and requires allocation of placements by a Transition
Panel. PKC Staged Intervention Framework ‘enhanced’ support offers mainstream settings
with significant input, which will meet the needs of some pupils. We are available to discuss
individual needs with parents and schools as appropriate.
Q) The proposed ISP is not on the ground floor—what about outdoor sensory needs
and the requirement to use stairs?
A) Retro-fitting ISPs into existing buildings is challenging. For CSoA, we will provide a
dedicated ISP playground and outdoor classroom and design suitable access routes.
Accessibility will be prioritised and differences required for primary and secondary pupils will
be considered.
Q) Are there safety risks associated with the first floor?
A) The PKC property team has assessed the site and planned mitigations. Safety remains
paramount and will be addressed transparently.
S) There are noise concerns with the outdoor area planned near the nursery
playground.
A) We will review this following tonight’s meeting and consider additional soundproofing if
required.
Q) What will happen to the current Support for Learning (SFL) provision?
A) It will relocate within the secondary building; the exact location is under discussion. SfL
staff will be involved in planning.

Page 22

22 
PKC - GENERAL
Q) Will the ISP impact mainstream class space?
A) No. The school is currently at approximately 75% occupancy, so space is available and
can be utilised to accommodate the ISP. Reconfiguration will maximise capacity.
Q) Will mainstream class sizes increase to make space?
A) No. Mainstream class sizes will remain the same. Some rooms will be used more
efficiently, and staff may share spaces, but this will not impact on learning for pupils. This
aligns with other schools and offers opportunities for collaboration. We aim for changes to
benefit the whole school, including accessibility and quiet spaces.
Q) What happens if recruitment fails?
A) Recruitment for recently established ISPs has been straightforward, with strong interest,
including from staff currently employed in other authorities. SISP PSAs are paid at a higher
grade within ISPs and supported with training that is commensurate to this, which helps
attract candidates. If difficulties arise, Inclusion peripatetic teams will provide temporary cover.
We will not pull staff from existing school roles. 
No further comments or statements.
Closing:
David Macluskey thanked everyone and reminded those attending that feedback can still be
submitted up until Friday 19th December.

Page 23

23 
PKC - GENERAL            
Appendix 2 
Perth & Kinross Council 
Intensive Support Provision at Community School of Auchterarder 
Summary of Consultation Responses

Page 24

24 
PKC - GENERAL
The statutory consultation on the proposal to establish a new Intensive Support Provision at
Community School of Auchterarder commenced on Wednesday 5 November 2025 and
closed on Friday 19 December 2025. 
Details of the proposal document were issued to the list of consultees contained within the
Proposal Paper. Letters were issued with a link to the proposal paper and details of where
and how to obtain a paper copy.  The Proposal Paper was also published on the Council
website.   
A specific email address was set up for representations and enquiries.  This was in addition to
the usual methods of submitting representations.  An online response form was set up on the
consultation webpage. 
Online Response Forms 
13 online response forms were received.  7 responses agreed with the Council’s proposal and
6 disagreed with the Council’s proposal.   
RESPONDENT GROUP NUMBER OF
RESPONSES
AGREE DISAGREE    
Parents 3 1 2
Parent and Staff 3 3 -
Pupils - - -
Staff 6 2 4
Elected Members - - -
Parent Councils - - -
Community Members - - -
Grandparents - - -
Trade Unions - - -
Not Disclosed 1 1 -
Total 13 7 6 
Representations made were around:
Concerns About the Proposed Location of the ISP (First Floor)
• Preference for a ground‑floor location for safety, access, and emergency evacuation.
• Concerns about how pupils with mobility needs or in a state of dysregulation would
safely move through busy areas and use stairs.
• Concerns that a first‑floor location contradicts ISP design principles requiring
immediate access to safe outdoor space. 
Impact on Existing Support for Learning Provision
• Concern about relocating the Support for Learning Base into the main building.
• Belief that the current SfL space is effective because it is separate, calm and quieter.
• Concerns that relocation will reduce access to quiet spaces, increase anxiety for
existing ASN pupils, educe attendance and engagement and disrupt exam
arrangements and Virtual Campus participation.
• Concern that the school lacks capacity to absorb displaced classes and staff.

Page 25

25 
PKC - GENERAL
Insufficient Space and School Capacity
• Concerns that the school is already full and lacks spare classrooms, suitable
alternative spaces for decanted departments and specialist rooms that can’t be
“hot‑desked.”
• Concern that future housing developments will increase school roll further. 
Outdoor Space, Safety and Security Issues
• Concern that current outdoor areas are unsafe, open to public access, flood‑prone or
unusable in winter and insufficient for current pupil numbers.
• Concern that an ISP secure outdoor area will further reduce already inadequate pupil
play space.
• Belief that the new ISP would require securing the whole campus perimeter, upgrading
and expanding outdoor areas for all pupils and fenced, dedicated outdoor learning
zones. 
Safety, Fire Evacuation & Accessibility Concerns
• Concern about fire doors.
• No safe evacuation route for level‑4 ASN pupils from the first floor.
• Inadequate wheelchair access options in the main building. 
Staffing & Resourcing Concerns
• Concern that ISP staffing will reduce support available to existing ASN pupils.
• Concerns about sufficient support staff and cleaning staff 
• Need for assurance of additional staff and budget, not redistribution. 
Impact on Whole‑School Functioning & Culture
• Belief that the proposal is disruptive to hundreds of pupils to support a small group.
• Being “forced through” without fully considering consequences.
• Objection to pupils being required to enter by side doors rather than the main entrance.
• Concerns that relocating departments will harm collegiate working, departmental
identity and space‑based specialist learning (e.g. Home Economics). 
Condition of the Current School Buildings
• Comments about existing disrepair, poor cleanliness, flooding and need for
refurbishment.
• Concerns that new ISP facilities won’t be maintained when existing buildings are not. 
Suggestions for Alternative Locations
• Proposed alternatives include:
➢ Using the top floor of the current Support Building.
➢ Using the existing LRC (ground floor).
➢ Relocating the library or merging it with the town library.
➢ Using unused upper floors.
➢ Creating an extension or using the PE building.
➢ Reallocating spaces currently used by external/partner agencies. 
Support in Principle but Not the Current Plan
• Respondents support establishing an ISP in principle with concerns that impacts on the
broader school community have been underestimated and better options exist that
would minimise disruption.

Page 26

26 
PKC - GENERAL
Written Representations 
During the consultation period between 5 November 2025 and 19 December 2025, written
representations were invited from statutory consultees and interested parties.  7 written
responses were received. One response agreed with the proposal and 6 responses agreed in
principle with the proposal but had concerns and questions.  2 respondents identified
themselves as parents and 3 identified themselves as staff. 
The written representations were around:
Strong Support in Principle for an ISP – But Concerns About the Current Proposal
• Respondents consistently expressed support for establishing local intensive ASN
provision, recognising the benefits for young people and families. However, this
support is accompanied by concerns about how the proposal is currently designed,
communicated and resourced. 
Location Concerns: First‑Floor Placement Viewed as Unsafe and Impractical
A major theme throughout the responses is that the proposed first‑floor location is unsuitable.
Concerns include:
• Safety and practicality of evacuating pupils with mobility needs or dysregulation when
lifts cannot be used.
• Lack of direct access to outdoor space, which is essential for ISP pupils.
• Having to cross busy concourse areas to reach the unit.
• Unclear rationale for locating a specialist ASN facility above ground level.
• Requests for reconsideration of alternative spaces (ground floor library area, second
upper floor, whole Pupil Support building). 
Insufficient Detail and Reassurance Around Safety, Fire Evacuation and Risk
Management
• Fire safety planning specific to complex needs pupils.
• Evacuation routes, protocols and staffing assumptions.
• Risk assessments for shared spaces and transitions.
• Information about supervising movement around a large and busy campus.
• The lack of detail does not provide confidence that safety concerns have been
adequately addressed. 
Concerns About Space, Teaching Accommodation and Curriculum Impact
A recurring theme is that although the school may appear to have capacity “on paper,” its
functional capacity is already constrained. Key concerns include:
• Loss of teaching rooms will reduce subject choice, create multi‑level classes, and
affect the senior phase curriculum.
• Insufficient specialist spaces (e.g., HE rooms, labs, quiet rooms).
• Impact on exam arrangements such as alternative accommodation (AAA) and Virtual
Campus access.
• Risk that the proposal would create widespread disruption to   classrooms across the
secondary building. 
Significant Disruption Anticipated if Support for Learning (SfL) is Relocated
Respondents strongly object to proposals that would relocate the existing SfL base into the
main building, stating that:

Page 27

27 
PKC - GENERAL
• The current building is purpose‑built and quieter, suiting pupils who rely on that
environment.
• Relocation triggers a “domino effect,” displacing multiple teaching areas (Modern
Languages, Maths, specialist bases).
• Noise levels and busier corridors in the main building would be unsuitable for many SfL
users.
• Specialist accessible toilets may not exist in the proposed locations. 
Resource Concerns – Fear of Dilution of Existing ASN Support
Respondents worry that establishing the ISP may reduce support to existing pupils by
drawing on current:
• Learning support staff
• Assessment capacity
• Funding
• Specialist expertise
They ask for a commitment that ISP staffing and funding will be fully additional, not
reallocated from existing provision. 
Outdoor Space: Inadequate Current Provision and Risks of Further Inequity
Concerns regarding long‑standing issues with outdoor provision across the campus.
Respondents emphasise:
• Older primary pupils already lack adequate, secure outdoor space.
• The proposed ISP outdoor area is undefined, may impact mainstream space, and
could further entrench inequalities.
• Outdoor access for ISP pupils must be easy, safe and directly accessible (ideally from
classrooms).
• If improvements are made for the ISP, improvements must also be made for the wider
school. 
Questions About Planning Process, Transparency and Timelines
Respondents note concerns about:
• Limited detail in the Proposal Paper.
• Lack of transparency around which alternative accommodation options were
considered.
• A sense that decisions have already been made despite assurances.
• Unrealistic timelines for construction, relocation and readiness by August 2026. 
Impact on Staff Workload, Morale and Working Conditions
Responses explain that relocating classrooms and bases will:
• Create heavy workloads due to moving resources built up over years.
• Negatively affect morale.
• Remove staff workspaces, leaving no quiet area for planning and non‑teaching time.
• Disrupt established teaching environments and specialist setups. 
Equity Concerns for the Whole School Community
• A strong theme is the sense that the proposal risks creating a perception of unequal
resource allocation—improving provision for a very small number of pupils while
existing issues affecting hundreds of primary and secondary pupils remain unresolved.
• Respondents request assurance that all pupils, including those with non‑ISP ASN
needs, will benefit from improved and equitable provision.

Page 28

28 
PKC - GENERAL
Alternative Solutions Proposed by Respondents
Common suggestions include:
• Locating the ISP on the ground floor (library space).
• Using the second upper floor of the Pupil Support building for the ISP.
• Relocating Social Work staff instead of displacing teaching departments.
• Minimising or avoiding disruption to mainstream teaching spaces. 
Public Meeting
As part of the statutory consultation process, 1 public meeting was held on 18 November
2025 at Community School of Auchterarder.   
Attended by 17 members of the public.   
The questions and comments were around: 
Travel, Access and Placement Arrangements
• Whether PKC will continue to fund travel costs for children who currently attend an ISP
outside their catchment and do not wish to return if a new ISP opens at CSOA.
• Whether there will be interim placements for pupils who require more support than
mainstream but do not meet ISP thresholds. 
Suitability and Safety of the Proposed ISP Location (First Floor)
• Concerns about the ISP being on the first floor, including: 
o Access to outdoor sensory spaces.
o The need for pupils to use stairs, especially those with mobility or dysregulation
needs.
o General safety risks associated with a first-floor location. 
• Concerns about noise from the planned outdoor area near the nursery. 
Capacity, Space and Impact on the Wider School
• Whether the number of classrooms planned will be sufficient given the increase in
pupils with ASN.
• Possible impacts on mainstream class space and whether class sizes may have to
increase to make room for the ISP. 
• What will happen to the existing Support for Learning (SfL) provision and where it will
be relocated. 
Staffing and Recruitment
• Concerns about whether there will be enough time for: 
o Recruitment
o Transition planning
o Summer building works
• What happens if recruitment is unsuccessful or staffing cannot be secured in time. 
Pupil Consultation 
Consultation was undertaken with Community School of Auchterarder pupils and P1 – P7
pupils in all associated primary schools. The consultation took place between 1 and 19
December 2025.

Page 29

29 
PKC - GENERAL
Community School of Auchterarder Pupils 
125 responses were received – 110 individual responses,10 class responses and 5 group
responses with an adult.  
99 respondents indicated they had no concerns about having ISP classes at their school.
76 respondents did not think the new ISP classes would change their school day at school. 
What do you think might be good about the new ISP classes at your school? 
It will give people who have difficulties in school a chance for their education
People can go to school closer to home
More challenged kids have a better chance to learn and be successful in school and life
It gives people with additional needs more opportunitys
They can make more friends and maybe meet people with similar needs. Its good because
children can play with people that they live near. 
To show that we really want to let everyone have the best opportunities in life
This will help families in our catmintt areas 
Children can go to local schools instead of travelling
It would be better for their ASN and their learning. They can't get too distracted - a safe space
where they can be calm and get help when they need it. They probably won't be as distressed
and protected from any bullies. 
If they had to travel a long way it would be good because now they won't have too travel as
far now
The people that come for the ISP classes might be happy making new friends here
It will be good for the community and the children who need the support
People can get help that they need.  Parents won't need to travel far. Children can make new
friends.
More inclusive
People that have needs can be welcomed and wont get to travel loads. 
Associated Primary Schools 
34 responses were received – 11 class responses, 1 group response with an adult and 22
individual responses.
22 respondents indicated they had no concerns about having ISP classes at their school.
23 respondents did not think the new ISP classes would change their school day at school. 
What do you think might be good about the new ISP classes at your school? 
It will be good because it will help other children with their learning. 
I think it's a good idea so it is fair, even if you have difficulties you can still take part.
Good so pupils can be with their friends.
Me and my brother would be in the same school, and that would be easier for my mum
Friends who have similar struggles and have made friends in nursery can be together in
primary
Other children can join in with the school. People that struggle with learning will get better
support.
So they are more safe.
People will feel calmer instead of crowded in a classroom - it will be better for them
They are safe, they're respected, they are learning, we can share toys
It's good to help pupils with problems
I think it's good that if pupils have difficulties and they struggle the teachers will help them.

Page 30

30 
PKC - GENERAL
I think it will be quite good for them because people could make new friends all across PKC

Page 31

31 
PKC - GENERAL
Appendix 3 
Schools (Consultation) (Scotland) Act 2010 
Report by HMIE addressing educational aspects of the proposal by 
Perth and Kinross Council to permanently establish a new Intensive
Support Provision in Community School of Auchterarder for pupils with
additional support needs with effect from August 2026. 
January 2026

Page 32

32 
PKC - GENERAL
1. Introduction 
1.1  This report from HMIE has been prepared by His Majesty’s Inspectors of Education 
(HM Inspectors) in accordance with the terms of the Schools (Consultation) (Scotland) Act 2010 (“the
2010 Act”). The purpose of the report is to provide an independent and impartial consideration of a
proposal by Perth and Kinross Council to permanently establish a new Intensive Support Provision
(ISP) in Community School of Auchterarder for pupils with additional support needs with effect from
August 2026. Section 2 of the report sets out brief details of the consultation process. Section 3 of the
report sets out HM Inspectors’ consideration of the educational aspects of the proposal, including
significant views expressed by consultees. Section 4 summarises HM Inspectors’ view. Upon receipt of
this report, the Act requires the council to consider it alongside any relevant considerations the
council received and then prepare its consultation report. The council’s consultation report should
include this report and must contain an explanation of how, in finalising the proposal, it has reviewed
the initial proposal, including a summary of points raised during the consultation process and the
council’s response to them. The council has to publish its consultation report at least three weeks
before it takes its final decision. With all proposals the council needs to follow all statutory obligations
set out in the 2010 Act.    
1.2  HM Inspectors considered: 
• the likely effects of the proposal for children and young people of the schools; any other users;
children likely to become pupils within two years of the date of publication of the proposal
paper; and other children and young people in the council area; 
• any other likely effects of the proposal; 
• how the council intends to minimise or avoid any adverse effects that may arise from the
proposal; and 
• the educational benefits the council believes will result from implementation of the proposal,
and the council’s reasons for coming to these beliefs. 
1.3  In preparing this report, HM Inspectors undertook the following activities: 
• attendance at the public meeting held on 18 November 2025 in connection with the council’s
proposals;  
• consideration of all relevant documentation provided by the council in relation to the proposal,
specifically the educational benefits statement and related consultation documents, written
and oral submissions from parents and others; and 
• visits to the sites of Community School of Auchterarder, Aberuthven Primary School, Blackford
Primary School and Dunning Primary School including discussion with relevant consultees. 
2. Consultation process 
2.1 Perth and Kinross Council undertook the consultation on its proposal(s) with reference to the
Schools (Consultation) (Scotland) Act 2010. 
2.2 The consultation ran from 5 November to 19 December 2025. A public meeting attended by 17

Page 33

33 
PKC - GENERAL
parents and members of the public was held at the Community School of Auchterarder on
18  November 2025. The council received 13 responses to the public consultation with just over half in
favour of the proposal. In addition, the council received seven emails from staff and parents. Almost
all of these responses expressed support for the proposal in principle. They also raised some concerns
about the location of the ISP and the impact it may have on the school overall. The council held a staff
meeting on 18 November 2025, which was attended by 36 people. They also consulted with children
and young people about the proposal through focus groups.    
3. Educational aspects of proposal 
3.1  The council believes there are potential educational benefits for young people with additional
support needs should the proposal go ahead. They feel that establishing the ISP in the Community
School of Auchterarder will provide an appropriate learning environment for children and young
people with additional support needs. They think that it will enhance learning experiences and
outcomes by providing a broad curricular programme encompassing the Broad General Education and
Senior Phase. They also believe that a bright, stimulating and safe environment will better meet the
needs of young people, supporting them to achieve their potential. HM Inspectors agree that there
are potential educational benefits in relation to the learning and teaching environment and young
peoples’ learning experiences. The establishment of the ISP in Auchterarder should ensure that young
people with multiple and complex needs can be educated within their local community, negating the
need to travel long distances.    
3.2 Almost all stakeholders who met with HM Inspectors agree with the proposal. Parents, staff,
children and young people all see the potential educational benefits of establishing an ISP in
Auchterarder and HM Inspectors agree with this view. The majority of stakeholders agree that
providing a high quality learning environment for those with multiple and complex needs should better
meet their needs. Parents and staff agree with the council that, in the longer term, it should also help
children and young people reach their potential. Having the ISP based in Auchterarder was viewed as
important by almost all children and young people who met with HMI Inspectors. They think that
young people with multiple and complex needs should not be traveling long distances to get to school.   
3.3  Whilst almost all stakeholders agree with the proposal in principle, parents and staff,
particularly in the Community School of Auchterarder, expressed concern about the practical
arrangements. Several parents and staff have concerns about the ISP being based on the first floor.
They believe it would be more advantageous to be located on the ground floor, allowing better access
to outdoor space. They also have questions about staffing in the ISP and feel the council need to be
clearer about the actual ratio of staff to children and young people. These issues were also raised in
the responses received by the council in response to the public consultation. The issue of access to
the Community School of Auchterarder is also a concern for staff and parents. Several are worried
about parking and drop-off arrangements. HM Inspectors agree with stakeholders that the location of
the ISP, staffing arrangements and access to the Community School of Auchterarder needs further
clarification by the council.

Page 34

34 
PKC - GENERAL
4. Summary 
HM Inspectors agree that there are potential educational benefits to the council’s proposal to
establish an ISP in the Community School of Auchterarder. Whilst the proposal is welcomed by almost
all stakeholders, there are a range of concerns that the council needs to address should it be
approved. The council should continue to engage with parents and staff of those schools impacted by
the proposal to allay any fears they may have regarding the location and operation of the ISP. This
includes the location of the ISP, staffing arrangements and access to outdoor spaces for learning. They
should also consider how the current parking and drop-off arrangements at the Community School of
Auchterarder could be improved to ensure that children and young people are safe.          
HM Inspectors 
January 2026