Democracy Spraffa

Appendix A – Consultation Report (Perth High School)

Perth and Kinross Council · 12 November 2025
Back to Learning and Families Committee — 12 November 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

PKC - GENERAL 
PERTH AND KINROSS COUNCIL 
EDUCATION AND LEARNING 
CONSULTATION REPORT 
REPORT ON THE OUTCOME OF THE CONSULTATION RELATING TO
THE PROPOSAL TO: 
Permanently establish a new Intensive Support Provision in Perth High
School for pupils with Additional Support Needs with effect from January
2026. 
This Consultation Report has been issued by Perth and Kinross Council in accordance with
the Schools (Consultation) (Scotland) Act 2010.
Appendix A

Page 2

2 
PKC - GENERAL
Contents 
Page 
1. INTRODUCTION         4 
2. BACKGROUND         4 
3. CONSIDERATIONS        5         
4. REASON FOR FORMULATING THE PROPOSAL    6 
5. SCHOOL INFORMATION        6          
6. THE CONSULTATION PROCESS      7      
7. THE PUBLIC MEETINGS        8        
8. RESPONSES TO THE CONSULTATION EXERCISE   8 
9. EDUCATION AUTHORITY RESPONSE TO WRITTEN AND ORAL         10   
REPRESENTATIONS         
10. EDUCATION SCOTLAND REPORT                11 
11.  ALLEGED OMISSIONS OR INACCURACIES     14   
12.  COMPLIANCE WITH SECTION 9(1) OF THE SCHOOLS   14 
(CONSULTATION) (SCOTLAND) ACT 2010   
13.  LEGAL ISSUES         15    
14.  PERSONNEL IMPLICATIONS       15       
15.  CONCLUSION         16         
16.   RECOMMENDATIONS        17

Page 3

3 
PKC - GENERAL 
Appendices 
Page 
Appendix 1 Minute of Public Meeting of       18        
Appendix 2  Summary of Consultation Responses     23          
Appendix 3  Education Scotland Report       29

Page 4

4 
PKC - GENERAL
PERTH AND KINROSS COUNCIL 
EDUCATION AND LEARNING 
This report has been prepared following consultation on the proposal that the Council: 
Permanently establish a new Intensive Support Provision in Perth High School for pupils
with Additional Support Needs with effect from January 2026.
Having had regard (in particular) to: 
(a) Relevant written representations received by the Council (from any person) during
the consultation period; 
(b) Oral representations made to it (by any person) at the public meetings held on 
31 March 2025 
(c) Education Scotland’s report on the proposal. 
1. INTRODUCTION 
This is a consultation report prepared in compliance with the Schools (Consultation)
(Scotland) Act 2010 on the above proposal. 
1.1 The purpose of this report is to: 
• Provide a record of the total number of written responses made during the Statutory
Consultation period; 
• Provide a summary of the written responses; 
• Provide a summary of oral representations made at the public meeting held on    
31 March 2025
• Provide a statement of the Council’s response to those written and oral
representations; 
• Provide the full text of Education Scotland’s report and a statement of the Council’s
response to this report; 
• State how the Council reviewed the above proposal following the representations
received during the Statutory Consultation period and the report from Education
Scotland; and 
• Provide details of any omission from, or inaccuracy in, the Proposal Paper and
state how the Council acted upon it. 
2. BACKGROUND 
2.1  The Learning and Families Committee on 29 January 2025 approved a report (Report
No. 25/19 refers) on an Options Appraisal for the expansion of Intensive Support
Provisions (ISPs) in Perth and Kinross Council primary and secondary schools.  The
Committee agreed to commence with an expansion of ISPs through three phases over
a three-year period. Phase 1 included undertaking a statutory consultation in respect of
the proposal to open an ISP in Perth High School.

Page 5

5 
PKC - GENERAL
2.2 In the report considered by the Learning and Families Committee on 29 January 2025,
it was agreed that the Strategic Lead: Education and Learning (Chief Education
Officer) commenced a statutory consultation in respect of the permanent establishment
of a new Intensive Support Provision in Perth High School for pupils with Additional
Support Needs with effect from January 2026 
2.3 The duties in undertaking a statutory consultation on a relevant school proposal are
outlined in the Schools (Consultation) (Scotland) Act 2010 and the accompanying
Statutory Guidance. 
2.4 Learning and Families Committee reports and the Proposal Paper referred to above
are available on the Council’s website www.pkc.gov.uk. 
3. CONSIDERATIONS 
3.1 The main considerations relating to the proposal are fully explained in the Proposal
Paper , and the main points are highlighted as follows:
3.2 Perth and Kinross Council is dedicated to fostering a community where everyone can
thrive, free from poverty and inequality.  Their vision focuses on making the best use of
public resources and ensuring continuous improvement of services. The Council's
Corporate Plan emphasises collaboration to achieve key priorities, including tackling
poverty, addressing climate change, and supporting sustainable places.  Perth and
Kinross Council aims to create a resilient, stronger, and greener local economy; enable
children and young people to reach their full potential; protect and care for the most
vulnerable; and support physical and mental wellbeing.  By working in partnership with
communities, they strive to create vibrant and successful areas, safe and sustainable
environments, and educated and responsible citizens, ensuring every child has the
best start in life.
3.3 Perth and Kinross Council’s Corporate Plan aims to tackle poverty, address climate
change, and support sustainable places.  This vision is further supported by the
Council’s Learning Estate Management Plan and the Education and Learning Policy
Framework Maximising Resources, which aim to enhance the range and quality of
learning experiences for all. 
3.4 Councils have a statutory duty in terms of the Education (Scotland) Act 1980 to make
adequate and efficient provision of school education across their entire area for the
current school population and future pattern of demand.   
3.5 Councils also have a statutory responsibility in terms of the Local Government in
Scotland Act 2003 to achieve best value.  To achieve best value and optimum
efficiency, the organisation of the school estate is therefore kept under regular review,
including the need for school provision and other factors, such as altering catchment
areas. 
3.6 The Schools (Consultation) (Scotland) Act 2010 provides a strong,
accountable statutory consultation process that local authorities must apply to their
handling of all proposals of major changes to schools.  These consultation processes
are expected to be robust, open, transparent and fair, and seen to be so. They are also
expected to be consistent across Scotland.

Page 6

6 
PKC - GENERAL  
3.7 The Education (Scotland) Act 2016 amends the Standards in Scotland’s Schools Act
2000 by adding in new duties to address inequality of outcome.  These duties apply in
different ways to both Scottish Ministers and Education Authorities. Where the
Education Authority is making or implementing strategic decisions about school
education, it is required to have due regard to the need to carry out its functions in a
way which is designed to reduce inequalities of outcome.  This is particularly directed
in the Act towards pupils who experience those inequalities through socio-economic
disadvantage, but there is also a power to extend the range of pupils who are covered
by this duty. 
4. REASON FOR FORMULATING THE PROPOSAL 
4.1 The proposal to permanently establish an Intensive Support Provision (ISP) at Perth
High School has been formulated in response to a growing and clearly evidenced need
for enhanced local provision for pupils with complex and multiple Additional Support
Needs (ASN) within the Perth High School catchment area. 
4.2     Currently, Perth High School does not have an ISP, despite having three primary
schools with specialist ISP settings in its catchment area. Young people requiring this
level of support must travel to other schools within Perth and Kinross to access
appropriate education. This results in longer travel times, reduced access to local
community resources, and potential impact on social and emotional wellbeing due to
separation from peers and familiar environments. 
4.3      Perth and Kinross Council has a legal obligation under the Education (Scotland) Act
1980 and the Education (Additional Support for Learning) (Scotland) Act 2004 to
provide adequate and efficient education, including for those with ASN. The proposal
aligns with these responsibilities and supports the Council’s commitment to inclusive
education. 
4.4     As of September 2024, 39% of children and young people in Perth and Kinross schools
have ASN, with a significant number presenting with complex needs. The existing ISP
network is under pressure, and the establishment of a new ISP at Perth High School
will help meet current and projected demand. 
4.5     The proposal supports the Council’s aim to reduce inequalities of outcome, particularly
for pupils affected by socio-economic disadvantage or disability, as outlined in the
Education (Scotland) Act 2016. Providing a local ISP ensures equitable access to high-
quality education and support for children and young people requiring special
education. 
4.6 It is intended that the new ISP will utilise spaces within the new school building that are
already specialist-designed classrooms and areas tailored to meet the needs of young
people with ASN. 
5. SCHOOL INFORMATION 
5.1 Perth High School is situated in Oakbank Road, Perth, PH1 1HB. The school offers
non-denominational secondary education for both girls and boys from S1 to S6, with a

Page 7

7 
PKC - GENERAL
capacity for 1600 pupils and a current enrolment of 1487 pupils. A new school building
for 1600 pupils will be operational from August 2025. 
6. THE CONSULTATION PROCESS 
6.1 A link to the Proposal Paper was issued by letter to those individuals and bodies listed
under Distribution within the document.  The Proposal Paper was also published on the 
Council’s website: www.pkc.gov.uk   
6.2     The Proposal Paper informed consultees that the consultation period would run
from Monday 24 March 2025 until close of business on Friday 23 May 2025, which
includes a period of 32 school days.  
6.3     The proposal on which consultation took place was to:
• Permanently establish a new Intensive Support Provision in Perth High
School for pupils with Additional Support Needs with effect from January
2026. 
6.4     The requirements for consulting on a relevant proposal relating to schools are set out in
the Schools (Consultation) (Scotland) Act 2010. In accordance with these
requirements: 
• A Proposal Paper was published on 17 March 2025. All statutory consultees
were written to, providing a link to the proposal paper and details of where and
how to obtain a paper copy. A copy of the document was available free of charge
to the consultees listed within the document.
• The Proposal Paper was published on the Perth and Kinross Council
website and was available in paper copy upon request.
• A public meeting was held to discuss the proposal on Monday 31 March 2025 at
Perth High School.
• The consultation period ended on Friday 23 May 2025.
• Education Scotland’s involvement consisted of receiving the options appraisal
and proposal paper documents, attending the public meeting, and a visit to the
school, which included engaging with relevant consultees. They also received a
copy of all online and written representations and the minutes of the public
meeting. Education Scotland then prepared a report on the educational aspects
of the proposal, which is attached as Appendix 5. 
6.5      The following schools are affected by the proposal: 
• Perth High School
• Abernethy Primary School
• Abernyte Primary School
• Craigie Primary School
• Errol Primary School
• Inch View Primary School
• Inchture Primary School
• Invergowrie Primary School
• Kinnoull Primary School
• Longforgan Primary School
• Moncreiffe Primary School

Page 8

8 
PKC - GENERAL
• Oakbank Primary School
• St Madoes Primary School 
6.6 In accordance with statutory requirements and good practice, the following persons
were consulted: 
• The parents of the pupils and children at the affected schools
• The parents of children expected to attend the affected schools within 2 years of  
the date of publication of this proposal document
• The Parent Council of the affected schools
• Directly affected pupils at the affected schools
• The teaching and support staff at the affected schools
• The trade union and professional association representatives of the above staff
• The Community Council
• Relevant users of the affected schools
• Elected Members of Perth and Kinross Council
• Education Scotland 
6.7 The number of letters issued with details of the Proposal Paper was 2580. 
6.8 During the consultation period, representations were sought from interested parties,
either in oral or written form or electronically.  An online response form and generic
email account was set up by the Council to receive representations and enquiries on
the proposal. 
6.9 This Consultation Report is the Council’s response to the issues raised during the
consultation period on the Proposal Paper. 
6.10 This Consultation Report is to be published on the Council’s website for a period of no
less than three weeks prior to final consideration by Learning & Families Committee on
12 November 2025 
7        THE PUBLIC MEETING 
7.1 A public meeting was held in Perth High School on Wednesday 31 March 2025. 
Fourteen members of the public attended.  A full note of the meeting is attached as
Appendix 1 which details the questions and issues raised at the meeting. 
8        RESPONSES TO THE CONSULTATION EXERCISE 
8.1      A total of 33 online response forms were received during the statutory consultation
period. Of these, 27 responses agreed with the Council’s proposal to establish an
Intensive Support Provision (ISP) at Perth High School, 5 responses disagreed, and 1
response neither agreed nor disagreed. However, 12 responses were invalid due to
missing required information such as name, address, or email, and were therefore
excluded from the validated total. 
Details of the respondents are contained within the Summary of Consultation
Responses, attached as Appendix 2.

Page 9

9 
PKC - GENERAL
8.2      In summary, the oral and written responses and questions can be grouped broadly as
follows: 
The majority of validated responses were in favour of the proposal to establish an
Intensive Support Provision (ISP) at Perth High School. 
Positives Identified
• Strong support for local access to specialist education for pupils with complex
ASN.
• Recognition of increased inclusivity and fairness for children with disabilities.
• Reduced travel time for pupils currently attending ISPs in other areas.
• Creation of a safe, tailored learning environment to meet diverse needs.
• Opportunity for personalised learning and better support within the local
community.
• Support for keeping siblings together and easing transitions for care-experienced
pupils. 
Questions Asked
• Facilities & Infrastructure: Concerns about the suitability of the school building,
access to quiet/safe spaces, natural light, and displacement of existing areas
such as the Support for Learning zone and Library.
• Education & Staffing: Questions on recruitment, staffing ratios, training for ASN
support, and whether existing staff resources would be impacted.
• Operations & Management: Enquiries about the timeline for implementation,
whether the ISP would begin as a temporary provision, and how success would
be measured.
• Governance & Communication: Requests for clarity on eligibility criteria,
placement processes, and whether pupils from other ISPs could transfer to the
new ISP. 
Overview of Concerns
• The ISP was not included in the original school design and planning.
• Risk of reduced support for pupils currently accessing ASN services.
• Existing staff shortages and resource limitations within the school.
• Potential disruption to mainstream pupils and concerns about integration.
• Vulnerability of neurodivergent pupils to bullying.
• Impact on pupils with milder support needs who may not qualify for the ISP. 
8.3      In summary, 2,580 letters were issued to consultees inviting participation in the
statutory consultation. In total, 33 online responses were received, of which 21 were
validated. Three written representations were submitted, all in support of the proposal.
A public meeting was held on 31 March 2025, attended by 14 members of the public,
where oral representations and questions were recorded. Full details of the responses
and feedback are provided in Appendix 1.

Page 10

10 
PKC - GENERAL
9          EDUCATION AUTHORITY RESPONSE TO WRITTEN AND ORAL            
REPRESENTATIONS 
9.1 Was the ISP part of the original school design, and how will the space be
adapted?
Plans for an ISP were not included in the initial design of the new Perth High School as
at that time projections for the requirement of ISP placements across the whole school
estate were in line with the available capacity.  However, increased need for
placements has become evident and therefore planning to include an ISP in the new
school building were revisited. The Council confirmed that the ISP will have dedicated
ASN classrooms and shared access to other specialist facilities, such as life skills and
sensory rooms. Adaptations will be made to ensure suitability for pupils with complex
needs.
9.2      Will the ISP displace existing support areas such as the Support for Learning
department or Library?
The ISP will be incorporated in the new building for Perth High School which the whole
school moved into in August 2025. The ISP is be placed where the original design of
the school had the Support for Learning Department.  Therefore, the Support for
Learning department is located in a separate area within the school that is designed to
be easily accessible and includes sectioned-off small workspaces within a large, bright
area from the outset of operational use of the school building. The placement of the
department ensures good access to support for pupils who require it.  The Library has
been positioned next to the English and Modern Languages departments, which is
considered an enhancement to the school's overall layout.
9.3   What facilities will be available within the ISP, and are they fit for purpose?
The ISP is designed to offer a high-quality, purpose-built learning environment for
pupils with complex and multiple Additional Support Needs (ASN). The facilities
planned for the ISP reflect a thoughtful and inclusive approach to education, ensuring
that the physical spaces support both academic and emotional development.          
The ISP will include two dedicated ASN classrooms, each measuring 57m². These
rooms are intended to accommodate small groups and allow for flexible learning
arrangements tailored to individual needs. In addition to these classrooms, the
provision will feature a sensory room (9.4m²), which offers a calming space for pupils
requiring sensory regulation, particularly those with autism or sensory processing
challenges. A life skills room, shared with the wider school and measuring 45.4m², will
support the development of practical skills such as cooking and personal organisation,
helping pupils prepare for independent living and post-school transitions.          
Further shared facilities include a medical room and an 18m² personal care room,
ensuring that pupils with health or hygiene needs are supported with dignity and
accessibility. A secure outdoor garden area will be available exclusively for ISP pupils,
providing opportunities for outdoor learning, play, and emotional regulation in a safe
and enclosed setting.          
The design of the ISP prioritises wellbeing, with quiet zones and sensory-friendly areas
integrated into the layout. Although the ISP area does not have windows, natural light
is provided through skylights, and the absence of visual distractions such as viewing
platforms contributes to a calm environment.

Page 11

11 
PKC - GENERAL
9.4   How will pupils be selected for the ISP, and what are the eligibility criteria?
Eligibility will be determined by Perth and Kinross Council Transition Panel in line with
Council policy. Placements will be based on assessed need and suitability of need.
9.5   Will pupils from other ISPs be able to transfer to Perth High School ISP?
Transitions between ISPs may be considered where appropriate and will be
considered by the Transition Panel.
9.6   How will the ISP support inclusion and integration with mainstream pupils?    
The Council is committed to inclusive education, with opportunities for ISP pupils to
engage in mainstream activities and social interactions.  The ISP will be designed to
support inclusion in the mainstream school, with opportunities for pupils to engage with
peers across the school where appropriate.  Opportunities for involvement in
mainstream activities will be tailored to the needs of the individual children, with all
supported to realise their potential.
9.7   What staffing arrangements will be in place, and how will staff be recruited and
trained?
The Council confirmed that staff will be recruited with appropriate ASN experience and
qualifications, and ongoing professional development will be provided.
9.8   Will the ISP be a secure area, and what safety measures will be in place?         
The Council confirmed that safety and security will be prioritised in the design and
operation of the ISP, including the availability of a secure outdoor space. However, it
should be noted that the doors to the ISP area are not secure. This aspect of the
building’s open design will be monitored, and where necessary, considerations around
pupil safety, particularly for those at risk of flight, will be factored into the placement
criteria. Risk assessments will be undertaken to ensure that pupils are placed in
environments that best support their individual needs and safety.
9.9   Will parents be able to visit the ISP before it opens?
Requests were made for opportunities to tour the ISP. The Council committed to
engaging with parents and providing access to view the facilities prior to opening.  It is
acknowledged that the initial access to the ISP prior to opening will be limited as the
new building will not be completed until the end of the summer holiday 2025.  Ongoing
enhanced transition arrangements will be in line with that expected of all ISP
placements.
9.10 How will success be measured, and how will the ISP support pupils across the
ASN spectrum?
The Council will monitor outcomes and ensure consistent support across all stages of
ASN needs. Success metrics will be developed to evaluate the impact of the provision,
including monitoring of the satisfaction of young people accessing the ISP and their
parents.  Opportunities to gain future feedback from the wider school community will
also be sought. 
10. EDUCATION SCOTLAND REPORT 
10.1 In accordance with the Schools (Consultation) (Scotland) Act 2010, a report was
produced by Education Scotland on the educational aspects of the proposal. The
Education Scotland report is reproduced in full (Appendix 5).

Page 12

12 
PKC - GENERAL
10.2 The purpose of the report is to provide an independent and impartial consideration of 
Perth and Kinross Council’s proposal to permanently establish an ISP at Perth High 
School for pupils with complex Additional Support Needs, effective from January 2026. 
10.3 An Education Scotland HMIE Inspector visited Perth High School, the old building, and
Inch View Primary School ISP, attended the public meeting held on 31 March 2025,
and engaged with pupils, parents, staff, and stakeholders. 
The report supports the proposal and is summarised below: 
• Educational Benefits: HMIE Inspectors agree that the proposal offers significant
educational benefits. The ISP has the potential to provide a high-quality learning
environment tailored to the needs of young people with complex ASN, enabling
access to a broad curriculum and opportunities for inclusion within the mainstream
school. 
• The ISP could reduce travel time and support transitions from primary school
alongside peers and siblings, strengthening community ties and improving
continuity in learning and wellbeing. 
• Most stakeholders support the proposal and value the Council’s commitment to
ensuring that resources allocated to the ISP are additional and do not detract from
existing provision. Staff are enthusiastic about the ISP and keen to access further
training. 
• Parents and staff emphasised the importance of managing shared spaces
effectively and ensuring that extracurricular activities remain accessible to all pupils.
Concerns were raised about bullying and the need for robust policies to promote
positive relationships.  A few stakeholders queried the flexibility of indoor and
outdoor spaces. HMIE Inspectors recommend continued engagement to ensure
these areas meet diverse needs and remain adaptable over time. 
• Concerns were raised about the ongoing construction of the new school site and
the need for well-planned transitions. HMIE Inspectors recommend clear plans
involving staff, parents, and pupils to support individual needs during the move. 
• Stakeholders raised queries about safe travel routes and transport arrangements.
The Council is encouraged to clarify these plans in collaboration with families. 
10.4 Perth and Kinross Council Response to Education Scotland’s Report 
The Council welcomes the report from Education Scotland and accepts its findings. 
In response to the findings contained within the Education Scotland report, Perth and
Kinross response is as follows: 
10.5 HMIE Inspectors note that stakeholders seek reassurance that resources
allocated to the ISP are additional and do not detract from existing provision.
They also request clarity on the use of shared spaces and the impact on the
wider school.
Perth High School is moving into a newly built school building in August 2025. 
Therefore, there will have been no existing use of any areas by subject departments.

Page 13

13 
PKC - GENERAL
The Senior Leadership Team in the school and Council officers have considered the
suitability of use of all spaces in the school to ensure the best possible education
opportunities for the diverse needs of all pupils.  The Council confirms that the ISP will
be an additional resource to the existing provision in the school, which will also
maintain its existing Support department. ISP and mainstream pupils will have access
to shared facilities including the sensory room, life skills kitchen, and personal care
room. These spaces will be managed to ensure equitable access and minimal
disruption to existing provision. 
10.6 HMIE Inspectors highlight the importance of ensuring that indoor and outdoor
spaces are flexible and meet the needs of young people.
The Council will ensure that the design and layout of the ISP supports a range of
learning experiences and is adaptable to meet the evolving needs of pupils. This
includes access to secure outdoor areas and specialist environments that promote
wellbeing and inclusion. 
10.7 HMIE Inspectors recommend that the Council continue to work with staff and
partners to address concerns about the internal location of the ISP within the
new school site.
The Council will continue to engage with staff and stakeholders to ensure the ISP is
appropriately situated and that pupils have access to high-quality learning spaces.
Feedback will inform any necessary future adjustments to the environment. 
10.8 HMIE Inspectors note concerns about the school still being under construction
and the need for well-planned transitions.
The Council has worked with senior leaders, parents, and pupils to develop clear
transition plans for those moving into the new school and the ISP. These plans are
tailored to individual needs and supported by trained staff. Opportunities for parental
involvement in transition activities will be provided. 
10.9 HMIE Inspectors highlight queries regarding safe travel routes and transport
arrangements.
The Council will work with families to clarify transport arrangements for pupils attending
the ISP. Safe travel routes will be established and communicated in advance of the
provision opening. 
10.10 HMIE Inspectors note that staff are keen to access additional training to support
their work within the ISP.
The Council will provide professional learning opportunities to build staff capacity and
expertise in supporting pupils with complex ASN. This will include training in autism,
trauma-informed practice, inclusive pedagogy, and other relevant areas. 
10.11 HMIE Inspectors recommend continued engagement with stakeholders to
address queries raised during the consultation.
The Council will continue to work in partnership with the Parent Council, young people,
parents and staff, throughout the implementation phase.

Page 14

14 
PKC - GENERAL
11. ALLEGED OMISSIONS OR INACCURACIES 
11.1 Section (10) (3) of the 2010 Act also places a requirement on the Council to provide
details of any inaccuracy or omission within the Proposal Paper which has either been
identified by the Council or raised by consultees.  This section of the 2010 Act also
requires the Council to provide a statement on the action taken in respect of the
inaccuracy or omission, or, if no action was taken, to state that fact and why.   
11.2 In the course of the consultation exercise, there were no areas identified by
respondents as being inaccurate or omitted from the Proposal Paper during the
consultation period. 
12. COMPLIANCE WITH SECTION 9(1) OF THE SCHOOLS (CONSULTATION)
(SCOTLAND) ACT 2010 
12.1 Section 9(1) of the Schools (Consultation) (Scotland) Act 2010 states that: 
After the Education Authority has received Education Scotland’s report, the Authority is
to review the relevant proposal having regard (in particular) to: 
(i) written representations received by the Authority (from any
person) during the consultation period;
(ii) oral representations made to it (by any person) at the public
meetings; and
(iii) Education Scotland’s report. 
12.2 Following receipt of the Education Scotland report, ten online representation and oral
representations made at the one public meetings held during the consultation period,
officers reviewed the proposals. 
12.3 The feedback from the consultation was considered by officers where all the questions
and comments raised were considered in detail.  This ensured that the Council met the
requirements to review the proposal under section 9(1) and 13(5) of the 2010 Act. 
12.4 Officers of the Education Authority have listened carefully to the points made at the
public meeting and have also considered equally carefully the Education Scotland
report and the online representations.  The proposal was reviewed to consider whether
any of the representations led the Council to reconsider other options as being
reasonable alternatives to the proposal.   
12.5 None of the representations led officers to conclude that there were any other
reasonable alternatives to the proposal, nor that the proposal should be reconsidered. 
12.6 The educational benefits were reviewed in respect of the Education Scotland report
and representations made. 
12.7 There were no factors included in the Education Scotland report or representations
made requiring any aspect of the educational benefits to be reconsidered.

Page 15

15 
PKC - GENERAL
12.8 Having reviewed the Education Scotland report and feedback from consultees, officers
concluded that the basis of the original proposal continues to be the most appropriate
response to establishing a new Intensive Support Provision (ISP) at Perth High
School. The proposal ensures that pupils with complex additional support needs in the
Kinross area can access specialist education locally, enabling them to maintain
connections with their peers and community. The Council remains committed to
implementing the ISP in a way that enhances existing provision, supports inclusive
practice, and delivers the educational benefits outlined in the proposal paper. 
13.   LEGAL ISSUES 
13.1 The Council has complied in full with the requirements of the Schools (Consultation)
(Scotland) Act 2010 throughout this statutory consultation. 
13.2 The Council is mindful of its duties in respect of equality, and the Equality Impact
Assessment did not identify that any parent, child or young person would be treated
less favourably as a result of this proposal. The proposed Intensive Support Provision
(ISP) at Perth High School will comply with the Council’s Accessibility Strategy and will
positively promote equal opportunities for children and young people with disabilities. 
13.3 In terms of Socio-Economic Impact, the assessment identified that establishing an ISP
within Perth High School will improve access to specialist education for pupils living in
the local area, including those who may be economically disadvantaged. By reducing
the need for long-distance travel to access appropriate support, the proposal enhances
equity and inclusion for families across the community. 
13.4 Under the terms of the Schools (Scotland) (Consultation) Act 2010, it is a legal
requirement that the Council should not reach any formal decision without waiting until
a period of three weeks starting on the day on which this Consultation Report is
published in electronic and printed form has expired. 
13.5 As it is the intention that this Consultation Report should be published, both
electronically and in written form, if required, on 3 September 2025, this meets the
statutory requirement to publish this report for more than three weeks before
consideration of the proposal by Learning & Families Committee on 12 November
2025. 
14. PERSONNEL IMPLICATIONS 
14.1 Staffing arrangements for the new Intensive Support Provision (ISP) at Perth High
School will be consistent with Perth & Kinross Council’s Staffing Standard and other
relevant local agreements. 
14.2 Consultation will be undertaken with school staff, Trade Unions, and professional
associations where appropriate, to support the implementation plan for staffing the ISP.
This will ensure that the provision is appropriately resourced and that staff are
supported in delivering high-quality education for pupils with complex additional
support needs.

Page 16

16 
PKC - GENERAL
15.  CONCLUSION 
15.1 The Council now has 4 broad options to consider, namely: 
(a)  adopt the proposal. 
(b)  withdraw the proposal.   
(c)  amend the proposal in some way which allows the proposal to proceed; or
(d)  amend the proposal significantly and undertake a further consultation exercise
on a new proposal. 
15.2 Education Scotland has identified that the proposal to establish a new Intensive
Support Provision (ISP) at Perth High School has clear educational benefits.
The ISP has the potential to provide a high-quality learning environment for young
people with complex additional support needs. The proposed design and location
within the school will offer flexible learning and social spaces tailored to individual
needs. Stakeholders recognise the value of the ISP to the local community, particularly
in enabling pupils to be educated closer to home, maintain peer relationships, and
access specialist support within a mainstream setting. HMIE Inspectors agree that the
ISP will enhance inclusive practice and support improved outcomes for young people. 
15.3 If the Council adopts the proposal, it is understood that the educational benefits set out
in the Proposal Paper would likely materialise.   
15.4 The key points that have been highlighted during the consultation period are as
follows: 
• Education Scotland’s report confirms that the proposal to establish an Intensive
Support Provision (ISP) at Perth High School presents positive educational
benefits. These include the creation of a high-quality learning environment tailored
to the needs of young people with complex additional support needs, with
opportunities for inclusion in mainstream activities and reduced travel time for
pupils. The provision is expected to strengthen peer relationships and community
connections by enabling pupils to be educated locally. 
• HMIE Inspectors commended the Council’s consultation and engagement efforts.
They recommended continued collaboration with parents, staff, and pupils
throughout the implementation phase to ensure that shared spaces are used
effectively and inclusive access to clubs and activities is maintained. 
• Stakeholders raised queries regarding the internal location of the ISP, the flexibility
of indoor and outdoor spaces, staffing arrangements, and safe travel routes. These
concerns will be addressed through the implementation process. The Council
confirmed that the ISP will be situated in addition to the existing Support
department, with staffing aligned to staffing standards and additional training
provided. Plans for secure outdoor access will be implemented, and safe transport
routes will be clarified in partnership with families. 
• The proposal received broad support from consultees. The majority of respondents
were in favour, and feedback from the public meeting, written submissions, and
pupil consultations indicated strong agreement with the educational rationale and
operational planning for the ISP at Perth High School.

Page 17

17 
PKC - GENERAL
16. RECOMMENDATIONS 
16.1 On the basis of the feedback received and taking account of the educational and social
benefits of the proposal, it is recommended that the Council approves: 
• To permanently establish a new Intensive Support Provision in Perth High School
for pupils with Additional Support Needs with effect from January 2026. 
David Macluskey 
Strategic Lead: Education & Learning (Education Chief Officer)
16 September 2025

Page 18

18 
PKC - GENERAL
Appendix 1 
Education & Learning 
Improving Lives Together
Ambition I Compassion I Integrity 
Statutory Consultation Public Meeting 
Minute of meeting held on Tuesday 31 March 2025
at 7:00p.m. in Perth High School 
Present:
David Macluskey Education & Learning (Chief Education Officer) 
Strategic Lead
Fiona Mackay   Service Manager – Inclusion & Additional Support Needs
Sarah Stephen  Quality Improvement Officer - Inclusion
Martin Shaw   Head Teacher, Perth High School
Karen Robertson  Service Manager – Business Services 
Present:
Jaclyn Meikle – Minutes ASN Transformation Programme Manager
Councillor John Rebbeck Convenor, Learning & Families Committee 
14 members of the public
5 Local Councillors 
Welcome and Introductions
David Macluskey opened the meeting and welcomed the members of public in attendance to
the Statutory Consultation Public Meeting.  
David introduced himself and the panel to the members of the public and thanked them for
attending.
Martin Shaw introduced himself and briefly outlined the positive impact he anticipated that an
ISP would have for his school community.
Format of meeting
Fiona Mackay then explained the format the meeting would follow.
The proposal
Fiona Mackay explained the consultation proposal to the attendees. The Council proposes to: 
• Permanently establish a new Intensive Support Provision at Perth High School for
pupils with Additional Support Needs with effect from January 2026.

Page 19

19 
PKC - GENERAL
Presentation
A presentation was provided that explored the proposal in further detail and explained the
background to the proposal and the reasons a new ISP is required.  
Fiona Mackay outlined:
• The PKC Vision
• Statutory duties of a local authority
• PKC & National ASN Data
• Explained the 4 levels of Staged Intervention (4-Intensive)
• The existing geographic spread of ISPs within PKC
• The requirement for an ISP at PHS
Sarah Stephen outlined:
• What is an ISP
• Profile of needs commonly supported in an ISP and examples of how need may be met
• The placement of the ISP within the school and what it will include
• The benefits of an ISP
Karen Robertson outlined:
The statutory consultation process including the legal framework, consideration by Learning &
Families Committee, the statutory consultation period and the different ways in which
representations from interested parties could be made as the first part of the consultation
process. Karen Robertson then explained the next stages of the process which includes the
involvement of Education Scotland, the preparation and publication of the consultation report
and the final decision made by the Learning & Families Committee, currently anticipated to be
November 2025.
Fiona Mackay then opened up the meeting to any questions, comments or observations from
the floor.
Q: When will the plan be formalised after the Learning & Families Committee agrees-
will it be temporary first, then permanent?
A: A report is expected to be presented to the Learning & Families Committee in November
2025. The provision will be established on a temporary basis from August 2025, and if
approved, it will become permanent from January 2026.
Q: The planning for the ISP at Perth High School appears to have been an afterthought
rather than a primary consideration. Why was this the case, and what opportunities are
other children missing out on due to the reduced space?
A: Planning for the new school began long ago, and the concept of a new ISP was not in
place at that time. The area that has been identified for the new ISP was originally intended
for support for learning. In addition, generic spaces, such as meeting rooms, have been
utilised to minimise the impact on other children. The new layout has relocated the library next
to the English and modern languages departments, enhancing the school's overall layout.
Q: Will children who currently utilise support for learning be able to access the
provision as well?

Page 20

20 
PKC - GENERAL
A: The goal is to meet needs with minimal intervention. The support for learning space is
moving to a separate area that allows easy access for the children who require to access it.
The layout of this new area will include sectioned-off small workspaces within a large, bright
area.
Q: My child accesses a secondary ISP in another school, focusing on complex and
profound needs. Would they meet the criteria for the Perth High School ISP, and would
it be like-for-like?
A: The new ISP will replicate what is available in ISPs in other schools, maintaining
consistency with the 'assessment of need' expectation. Families are not required to move
their child if their child is settled in another secondary ISP. An offer to discuss individual cases
is available if moving a child would be beneficial.
Q: What has been considered in relation to pre-transition support, P7-S1 assessment
experience, and strategies?
A: Support will be based on assessment, with some children accessing mainstream classes
and others receiving bespoke intensive support. Specialist teaching in practical activities will
follow a secondary model, with opportunities to attend art, science, and other classes using
similar strategies. 
Q: Have the spaces for been allocated to pupils yet? If not, what is the process for
identifying them, and who will be responsible for this?
A: The first step was to review the current P7 students who live in the Perth High School
catchment and have been allocated to another ISP, this allocation process was completed in
term 2 of this school year. Now that we are at the stage of this consultation, we will consult
with these parents first, as some may be interested in transferring. Following that we will
support planning for other children who are in another ISP but who wish to transition to Perth
High School ISP.  Our goal is not to fill both classes this year, it should be a more gradual
process of building up numbers. Families with children in S5/6 are unlikely to want to move
ISP at this stage in their school career. 
Q: Can S1, S2, and S3 pupils in an existing ISP move?
A: Choice will be given and offers will be made to pupils from S1-S4. There is an
understandable reason why settled children would not want to move.
Q: How does recruitment work for the extra staff required, and will it affect the start
date?
A: We are working closely with the school to advertise for experienced staff to fill the posts
that will be advertised and are confident we can fulfil recruitment within the timescale.
Recruitment will follow the same process as any teaching post, with interviews against key
competencies. Existing staff with ISP experience may choose to apply, but it is not restricted
to internal candidates and there will be a national advert for the skilled jobs.
Q: How will it work timescale-wise with recruitment, the November report, and January
2026 opening?
A: We are currently recruiting for an ISP Principal Teacher, who we hope will be in post
before the summer holidays. This person will then be involved in recruiting the teacher and
PSAs. All staff will be in place from August to staff so that the temporary provision has staff in
place with permanent contracts.

Page 21

21 
PKC - GENERAL
Q: What are the staffing ratios?
A: The staffing ratio is 1 teacher and 1 PSA for every 8 pupils, plus additional support for
individual needs as deemed necessary.
Q: My child is currently mainstream, moving up to Secondary School in summer 2027.
Is there a flexible approach for these children?
A: If ISP placement is needed to provide the right support for a child to access education,
then a comprehensive assessment by the school and an educational psychologist will be
undertaken. Requests are usually received to consider a change of pathway for a child as
early as possible and ideally the assessment of need should be considered by the Transition
Panel when the child is in P6. 
Q: Triangle of support (Staged Levels of Intervention): There are increasing ASN
numbers showing at all stages of the triangle. Is there the same approach to support?
A: Resource and support will be provided for children and young people at all stages; the
intensity of this support increases the stage of intervention that a child is supported at.  For
instance, children supported at universal level will receive that support through the class
planning that a classroom teacher undertakes. Support at other levels may involve a PSA or
specialist teaching.  Careful resource management is essential. The Scottish Government has
allocated £715k to PKC for the year ahead, this will be used to support children and young
people with additional support needs appropriately and is enhancing existing resourcing in
school and the development of the new ISPs.
Q: What would success look like for young people coming out of school having
attended an ISP?
A: Success is measured by equipping students to enter society and lead fulfilling lives. The
ISP has the potential to support young people to thrive and is part of the school's mainstream
offer.
Q: Is there any criteria for an ISP place, such as being toilet trained?
A: Assessment is based on wider needs, with no strict criteria. A holistic assessment involving
parents, the school, and an educational psychologist will be conducted.
Q: Is an ISP a secure area that children can't run off from? What is the access to
doors?
A: ISPs are often separate areas within the school, with children supported to remain in the
environment. One existing PKC ISP is secure, which might affect a child's placement if this is
a key factor. Risk assessments for flight-risk children will be part of the assessment. The
transition panel will consider these factors, working with primary schools to gather full
assessment information. Children will be placed in suitable environments and supported to
develop risk awareness and independence.
Q: Is outdoor space secure?
A: The proposed ISP has its own enclosed garden area.
Q: Accessing additional support at PHS is difficult. Is there a plan to introduce
additional learning at all stages for staff to know?
A: We are committed to improving support for staff. It is a journey for the entire system.
Senior leaders are keen to engage with parents and support all staff at all levels to meet the
complexity of needs. Needs have changed and increased since COVID, and we are working
with all schools to deliver inclusive education.

Page 22

22 
PKC - GENERAL
Q: What will be in place to keep people safe (entering, leaving, etc.)?
A: The school location has no general thoroughfare. The ISP is next to the Senior
Management Team (SMT) space and guidance space, with staff always present. Doors
contain and break up the area. There are no windows, but there is a skylight. There is ample
space for movement to support regulation, and no viewing platform above.
Q: Will there be an opportunity for parents to look around the ISP/new school before
opening day?
A: Typical academic sessions include parents' evenings and regular family learning events
where these opportunities will be available in the future. Keys for the new Perth High School
will be handed over during the summer break, with relocation happening between then and
August. Initially, there will be limited access to the new PHS, but photos and images of new
classes and areas will be made available to parents.
Q: Have children already been earmarked for certain schools?
A: Transition information will be shared first, and from there, staff will liaise with parents and
schools to discuss the best placement for a child. Parents can always submit a placing
request if appropriate.
Q: Which current provision has secure access?
A: Based on individual needs, schools can vary and have flexibility to adapt this approach,
taking cognisance of certain risks like fire regulations. Perth Academy has had secure access
in the past. 
David Macluskey, Education & Learning (Chief Education Officer) Strategic Lead thanked the
panel, Councillors and members of the public for attending and closed the meeting.

Page 23

23 
PKC - GENERAL 
Appendix 2 
Perth & Kinross Council 
Intensive Support Provision at Perth High School 
Summary of Consultation Responses

Page 24

24 
PKC - GENERAL
The statutory consultation on the proposal to establish a new Intensive Support Provision at
Perth High School commenced on Monday 24 March 2025 and closed on Friday 23 May
2025. 
Details of the proposal document were issued to the list of consultees contained within the
Proposal Paper. 2580 letters were issued with a link to the proposal paper and details of
where and how to obtain a paper copy.  The Proposal Paper was also published on the
Council website.   
A specific email address was set up for representations and enquiries.  This was in addition to
the usual methods of submitting representations.  An online response form was set up on the
consultation webpage. 
Online Response Forms 
33 online response forms were received.  27 responses agreed with the Council’s proposal
and 5 disagreed with the Council’s proposal. One response neither agreed nor disagreed with
the proposal. However,12 responses were invalid as they failed to provide a required name,
address or email address to validate the response. 
RESPONDENT
GROUP
NUMBER OF
RESPONSES
AGREE DISAGREE NEITHER     
Parents 18 15 2 1
Pupils - - - -
Staff 2 2 - -
Elected Members - - - -
Parent Councils - - - -
Community Members - - - -
Grandparents - - - -
Trade Unions - - - -
Other 1 1 - -
Not disclosed (Invalid) 12 9 3 -
Total 33 27 5 1
Validated Total 21 18 2 1 
Representations made were around:
Family and Community Benefits
Local Access: Positive feedback from a parent who values having both mainstream and ISP
options within the same school and catchment area, supporting family unity and community
integration.
Staffing and Resourcing 
Staffing Challenges: Questions about where teaching staff for the ISP will come from,
especially given existing struggles to support ASN pupils.

Page 25

25 
PKC - GENERAL
Dedicated Staffing: Emphasis on the importance of having specific staff for the ISP to avoid
reducing support for mainstream pupils.
Suitability of Facilities
Building Design: Concerns that the current school building was not designed with an ISP in
mind, suggesting it may not be fit for purpose.
Quiet/Safe Spaces: A need for safe, quiet areas for pupils with additional needs to retreat to
when overwhelmed or bullied.
Natural Light and Environment: Questions about the quality of the ISP space, particularly
regarding natural light and views.
Financial and Strategic Planning
Cost Efficiency: Suggestions that centralising ISP provision might be more cost-effective.
Late Communication: Frustration that the ISP was not communicated earlier during the
years of planning the new school.
Consultation Document: Criticism of the consultation document for being vague and lacking
clarity.
Inclusion and Impact on Mainstream Pupils
Integration Doubts: Concerns that ISP pupils may not be included in mainstream activities,
questioning the value of placing them in a mainstream school.
Disruption Concerns: Fears that ISP pupils may be disruptive to the larger mainstream
population.
Capacity and Future Planning
Building Capacity: Agreement with the proposal is conditional on not reducing capacity for
mainstream pupils.
Scalability: A suggestion to plan for more ISP spaces than currently proposed, anticipating
higher demand. 
Written Representations 
During the consultation period between 24 March 2025 and 23 May 2025, written
representations were invited from statutory consultees and interested parties.  3 written
responses were received.  All 3 responses supported the Council’s proposal.   
Representations were made around:
Support for an ISP at Perth High School to support transition.
This provision may support care experienced pupils who require it.
Ther potential that siblings can be kept together.
Concern the ISP was not included in the original school design.

Page 26

26 
PKC - GENERAL
The allocation of space for the ISP and displacement of Support for Learning area and
Library.
Parents were not engaged about the inclusion of an ISP in the new school. 
Public Meeting
As part of the statutory consultation process, 1 public meeting was held on 31 March 2025 at
Perth High School.   
Attended by 14 members of the public.   
The questions and comments were around: 
Planning and Implementation
Timeline and Formalisation: Questions about when the ISP plan will be formalised and
whether it will begin as a temporary provision.
Perception of Planning: Concerns that the ISP was an afterthought in the school’s design
and planning process.
Impact on Existing Space: Queries about what other opportunities or spaces may be lost
due to the ISP. 
Access and Eligibility
Eligibility Criteria: Questions about who qualifies for the ISP, including whether children
must be toilet trained.
Current Users of Support for Learning: Whether these pupils will also be able to access the
ISP.
Transfer Between ISPs: Whether pupils in existing ISPs (S1–S3) can transfer to the new
one.
Mainstream to ISP Flexibility: Interest in flexible pathways for children currently in
mainstream education. 
Transition and Placement
Pre-Transition Support: Considerations for P7–S1 transition strategies and assessments.
Placement Process: Questions about how ISP places will be allocated and who is
responsible.
Earmarked Pupils: Whether any children have already been assigned to specific schools. 
Staffing and Resources
Recruitment Process: How staff will be recruited, and whether this will affect the ISP’s start
date.
Staffing Ratios: Inquiries about the ratio of staff to pupils.
Training and Support: Need for additional learning and training for staff to support ASN
pupils effectively. 
Safety and Security
Secure Facilities: Questions about whether the ISP will be a secure area, including access
to doors and outdoor space.
General Safety Measures: What will be in place to ensure safety during entry, exit, and
throughout the school day.

Page 27

27 
PKC - GENERAL
Comparison with Other Provisions: Which current provisions already have secure access. 
Parental Involvement
School Visits: Requests for opportunities for parents to tour the ISP or new school before it
opens. 
Outcomes and Evaluation
Success Metrics: What success looks like for pupils who attend the ISP.
Support Across ASN Spectrum: Ensuring consistent support across all stages of ASN
needs. 
Pupil Consultation 
Consultation was undertaken with Perth High School pupils and P5 – P7 pupils in all
associated primary schools. The consultation took place between 9 and 23 May 2025. 
Perth High School Pupils 
166 responses were received – 133 individual responses, 22 in a group with an adult and 11
whole class responses.  149 respondents indicated they had no concerns about having ISP
classes at their school.
154 respondents did not think the new ISP classes would change their school day at school. 
Feedback examples: 
What do you think might be good about the new ISP classes at your school? 
Allow young people to fit in better and feel included.
That they wouldn’t be spilt from friends and not feeling left out that they can’t go to the same
school because of their extra needs.
It helps people with special needs and gives everyone an equal chance at an education.
That kids will get to come up to the school with friends and family, so they feel more
comfortable.
It will be a safe place for people who don’t like busy classes.
They won’t feel left out
That it'll make the school more inclusive
People who need extra help from ISP can get it at a nearby school.
I think that it will be easier for the pupils to come to school knowing they have friends there. 
Associated Primary Schools 
106 responses were received – 77 individual responses, 2 in a group with an adult and 27
whole class responses.  
90 respondents indicated they had no concerns about having ISP classes at their school.
92 respondents did not think the new ISP classes would change their school day at school. 
Feedback examples: 
Why do you think it is important for young people to attend their local catchment school?

Page 28

28 
PKC - GENERAL
So, they don't feel worried when traveling long distances and will be able to keep the same
friends from their primary school.
Because it will make them feel like everyone is equal, they should be treated kindly just like
the others.
It is easy to find familiar faces, so you feel more comfortable and less like a stranger in a
strange place.
It is not fair that people who have complex additional support needs have to travel far to get to
the school that is right for them.
So that if they have friends there, they can still see them. It will be quicker for mums and dads
to get to the school if the ISP need anything.
So, they don’t have to travel far and maybe see their friends from primary school, so they
remember them.
So, children don't have to travel so far as traveling can make people nervous and also more
of their friends can be there with them.
Be with friends and family members

Page 29

29 
PKC - GENERAL    
Education Scotland Report    Appendix 3 
Schools (Consultation) (Scotland) Act 2010 
Report by Education Scotland addressing educational aspects of
the proposal by Perth and Kinross Council to establish a new
Intensive Support Provision in Perth High School. 
May 2025

Page 30

30 
PKC - GENERAL      
1. Introduction 
1.1  This report from Education Scotland has been prepared by His Majesty’s Inspectors of 
Education (HM Inspectors) in accordance with the terms of the Schools (Consultation)
(Scotland) Act 2010 (“the 2010 Act”). The purpose of the report is to provide an independent
and impartial consideration of a proposal by Perth and Kinross Council to establish a new
Intensive Support Provision (ISP) in Perth High School. Section 2 of the report sets out brief
details of the consultation process. Section 3 of the report sets out HM Inspectors’
consideration of the educational aspects of the proposal, including significant views
expressed by consultees. Section 
4 summarises HM Inspectors’ view. Upon receipt of this report, the Act requires the council to
consider it alongside any relevant considerations the council received and then prepare its
consultation report. The council’s consultation report should include this report and must
contain an explanation of how, in finalising the proposal, it has reviewed the initial proposal,
including a summary of points raised during the consultation process and the council’s
response to them. The council has to publish its consultation report at least three weeks
before it takes its final decision. With all proposals the council needs to follow all statutory
obligations set out in the 2010 Act.    
1.2  HM Inspectors considered: 
• the likely effects of the proposal for young people of the school; any other users;
children likely to become pupils within two years of the date of publication of the
proposal paper; and other children and young people in the council area; 
• any other likely effects of the proposal; 
• how the council intends to minimise or avoid any adverse effects that may arise from
the proposal; and 
• the educational benefits the council believes will result from implementation of the
proposal, and the council’s reasons for coming to these beliefs. 
1.3  In preparing this report, HM Inspectors undertook the following activities: 
• attendance at the public meeting held on 31 March 2025 in connection with the
council’s proposals;  
• consideration of all relevant documentation provided by the council in relation to the
proposal, specifically the educational benefits statement and related consultation
documents, written and oral submissions from parents and others; 
• held a range of online and in person meetings with relevant consultees; and 
• visits to the site of the current Perth High School, the new site of Perth High School
and proposed ISP space, and a visit to Inch View Primary School ISP, including
discussion with relevant consultees. 
2. Consultation process 
2.1  Perth and Kinross Council undertook the consultation on its proposal(s) with reference
to the Schools (Consultation) (Scotland) Act 2010.

Page 31

31 
PKC - GENERAL  
2.2  The consultation ran from 24 March until 23 May 2025. Details of the proposal were
issued to relevant stakeholders and published on the council website. The website included a
helpful video explaining the consultation in an accessible way. A public meeting was held on
31 March 2025, which 14 members of the public attended. The council received a total of 33
responses to its online surveys and three written submissions, Overall, most respondents
were in favour of the proposal. A few were undecided and a few were against the proposal.
Those against are concerned about the potential reduction and limits to available space within
the new Perth High School, potential impact on staffing and the proposed location of the ISP
within the school site. 
2.3  Perth and Kinross Council undertook consultation with children and young people at
local primary schools and at Perth High School. One hundred and six responses were
received from the local primary schools, and 166 from Perth High School, including individual
and group responses. Most children and young people had no concerns about having ISP at
the school and did not think it would change their school day. Most children and young people
are positive about the proposal. They think it is important for young people to have the
opportunity to attend a school close to their home and with their peer group. 
3. Educational aspects of proposal 
3.1      HM Inspectors agree that opening an ISP provision at Perth High has potential
educational benefits. Across Perth and Kinross, existing provision designed to meet the
needs of children and young people who require specialist placements are at or over
capacity. The council’s transitions panel had identified that an increasing number of children
who live in the Perth High School catchment, will require access to a primary school ISP. It
also identified that a number of young people who live in the Perth High School catchment,
currently require to be placed in a secondary school ISP within another Perth and Kinross
school. This proposed ISP provision has the potential to support the council in meeting the
projected increase in the needs of children and young people requiring specialist support
within the locality from January 2026.    
3.2      The council has stated a range of educational benefits they consider this proposal will
bring. HM Inspectors agree there that this proposal could support young people to access
appropriate education close to home. Young people accessing the new ISP at Perth High
School will be able to transition from primary school with their peers and siblings. This will
help them to maintain important peer relationships. There are potential benefits to providing
young people the opportunity to access social and community experiences through their
school that help to build stronger connections within their local community. If approved this
proposal should also reduce the distance travelled to school. There are also potential benefits
to further the opportunities for inclusion in a range of mainstream school activities, as
appropriate. 
3.3  HM Inspectors agree that the proposed space for the new ISP provision at Perth High
School could provide appropriate learning areas for young people with a range of additional
support needs. If the council agrees to move forward with the proposal, young people will
begin accessing the new ISP provision from January 2026. Interim arrangements to support
the needs of a few learners in the broad general education will be in place from August 2025.
HM Inspectors believe that the current available space has the potential to meet the learning
and wellbeing needs of up to 16 young people. In the longer term, the council should keep the
available space under review, as the council’s projections suggest that the number may rise

Page 32

32 
PKC - GENERAL
beyond this. The council should make clear the capacity of the ISP and its plans should the
numbers rise. 
3.4      HM Inspectors met with young people, parents, staff and members of the transition
panel to discuss their views. Most are in favour of the proposal. They agree that young people
requiring ISP should be educated close to their home and with their peers where possible.
However, a minority of stakeholders who met with HM Inspectors raised a few queries in
regard to aspects of the build and space. This included concerns about the internal location of
the ISP within the new Perth High School site. HM Inspectors recommend that the council
should continue to work with staff and relevant partners to consider this and how to meet best
the needs of young people accessing the provision as it develops. This will ensure all young
people have access to           high-quality, appropriate learning spaces to meet their needs,
including having regular use of secure outdoor spaces so as not to disadvantage them
against their mainstream peers. 
3.5      A minority of stakeholders, including children and young people, who met with 
HM Inspectors raised the concern that the new school site is still under construction. They
also stated that all young people, including those with ASN, would require time and support to
transition to the new school. HM Inspectors recommend that the council work closely with
senior leaders, parents and all young people to make clear plans to support transition to the
new school. Well-planned transitions should take account of individual needs supported by
staff who have a clear and shared understanding of the requirements of those with additional
support and those who are likely to be placed in the ISP from August 2025. The council
should also consider opportunities for parents to be included in deciding on and participating
in transition activities. 
3.6      Stakeholders who met HM Inspectors raised queries on the proposed safe travel
routes and transport arrangements that would be in place to support young people attending
the ISP. The council should work with parents to make clearer the arrangements for safe
travel to and from the ISP should the proposal be agreed. 
4. Summary 
HM Inspectors agree that the proposal has potential educational benefits for young people
with additional support needs. In opening a new ISP provision at Perth High School, more
young people should receive the right support at the right time. The new provision should
enable more young people to attend school in their own community, reducing unnecessary
travel time and supporting connections with peers. This should help the council to meet the
national requirements of the presumption of mainstreaming. Young people will have, where
appropriate, opportunities to be included within the mainstream school alongside their peers.
The new ISP provision in Perth High School will further support the council in meeting the
projected increase of young people with a range additional support needs requiring specialist
provision keeping them where possible within their own community. The council should
continue to engage with stakeholders to address the queries they have raised.   
HM Inspectors 
May 2025