Perth And Kinross Council 
Kinross-shire Area Committee 
15 February 2024 
ROAD SAFETY UPDATE 
Report by Head of Environmental & Consumer Services
(Report No. 24/57) 
1.  PURPOSE OF REPORT 
1.1  The purpose of this report is to advise members of the Committee of progress
on the delivery of road safety projects within the Kinross-shire area. 
2.  RECOMMENDATIONS 
2.1  It is recommended that Committee: 
(i)  Agree to the progress being made on the delivery of road safety
schemes in Kinross-shire; and 
(ii)  Note that a further update will be brought to the Committee at a future
meeting. 
3.  STRUCTURE OF REPORT 
3.1  This report is structured over the following sections:
• Section 4: Background
• Section 5: Road Safety Scheme Progress and Delivery
• Section 6: Programme Summary
• Section 7: Conclusion
• Appendices 
4.  BACKGROUND/MAIN ISSUES 
4.1  Perth and Kinross Council’s road safety projects assessment criteria provides
a procedure for prioritising traffic management and road safety projects.
Therefore, all potential schemes are assessed and, if considered appropriate,
ranked against other projects to ensure those schemes that deliver the
greatest benefit to local communities are delivered first. With each financial
year, projects are assigned to the relevant programme of works and budget,
then installed as resources permit. 
4.2  Therefore, whilst one area may have a number of road safety priorities, these
need to be assessed and considered alongside priorities identified in all areas. 
4.3  The list of proposed projects is based on a technical assessment of the road
usage and road environment. The assessment criteria does not take into

Page 2

account community concerns about perceived road safety, although these are
often raised and articulated by local elected members. In order to ensure that
this dialogue occurs in a structured and efficient manner, the Traffic & Network
Team meets with the Ward Councillors every three months to review the list
and identify community priorities. Therefore, in some circumstances some of
the preferred schemes that may have a lower ranking can be progressed first
to address community concerns if there is elected member support. 
4.4  The Traffic and Network team last met with the Kinross-shire Councillors on
31 October 2023 when the current project priorities were discussed and
reviewed.  At the time of writing, the next meeting is scheduled for 8 February
2024. 
5.  ROAD SAFETY SCHEME PROGRESS AND DELIVERY 
Reduced speed limits 
5.1  Traffic Regulation Orders (TRO) are being processed for the new 30mph
speed limits at Drum and Auchmuirbridge and the new 40mph speed limit
between Scotlandwell and Auchmuirbridge.  The TROs and the regulatory
signs should all be in place before the end of the financial year.  A short
40mph buffer will be retained at the east of Drum, and new 40mph buffers
installed at the west of Crook of Devon and the east of Blairingone in 2024/25,
at locations previously agreed with the Local Elected Members, as part of the
ongoing TRO programme. 
School Keep Clear markings 
5.2  The Road Safety Team has met with the Head Teacher of Kinross Primary
School to agree the extent of the School Keep Clear markings on Station
Road and the waiting restrictions within the school campus.  Work is ongoing
on the preparation of the Traffic Regulation Orders for these restrictions.   
Waiting restrictions 
5.3  Unfortunately, there has been no progress on the Traffic Regulation Orders for
the waiting restrictions at Buchan Avenue in Kinnesswood and the Muirs in
Kinross due to other priorities of work.  Work is due to resume in the new
financial year.  Once completed, a further set of waiting restrictions will be
selected and progressed from the ongoing TRO programme. 
Minor traffic engineering projects 
5.4  New “Give Way” road markings and a regulatory sign have been installed at
the Burns Begg Road junction with High Street, Kinross.   
5.5  A bollard is being installed between Lathro Lane and Dalwhamie Street to
prevent drivers travelling across the grass area between the two culde-sacs.

Page 3

5.6  Upgraded warning and information signs have been ordered for New Gullet
Bridge and Old Gullet Bridge, south of Scotlandwell. 
5.7  New haulage route signs have been ordered along the B9097 to direct heavy
traffic between the M90 motorway and the Westfield site.  These measures
should all be in place before the end of the financial year. 
A977 Mitigation Measures 
5.8  The traffic signals at the School Road/Station Road junction were completed
last calendar year and are operational.  The traffic signals at Drum crossroads
have recently been installed, tested and are now operational. 
5.9  Once the 30mph speed limit at Drum is installed (see Item 5.1 above), the Traffic
& Network Team will undertake traffic surveys through Crook of Devon and
Drum to assess any changes in traffic volumes and vehicle speeds.  This will
help determine whether the remaining major mitigation measure at the B9097
junction is necessary.  If the two traffic signals projects have been successful in
changing travel patterns, and the B9097 junction realignment project is deemed
unnecessary, then the remaining budget could be utilised for other road safety
measures along the A977. 
Vehicle-activated signs (VAS) 
5.10  New speed-activated, driver-feedback signs have been installed at Cleish east
and west, Gairneybank north, Gairneybridge north and south, Tillyochie east
and west, Wester Balgedie north and south, and Springfield Road east and west
in Kinross as part of the ongoing VAS programme. 
Projects in Ward 8 during 2023/24 
5.11  The table below shows all the completed projects in Ward 8, or those due to
be installed before the end of, this financial year. 
Project Location
Ordere
d
Installe
d Comments
20mph speed
limit Glenfarg  
Permanent 20mph
speed limit
20mph speed
limit Keltybridge  
Permanent 20mph
speed limit
20mph speed
limit Maryburgh  
Permanent 20mph
speed limit
20mph speed
limit Scotlandwell  
Permanent 20mph
speed limit
30mph speed
limit Auchmuirbridge  
Reduction from
40mph limit
30mph speed
limit Carnbo  
New 30mph speed
limit

Page 4

30mph speed
limit Drum   New 30mph speed
limit
40mph speed
limit
Scotlandwell to
Auchmuirbridge  
New 40mph speed
limit
Bollards Lathro Lane,
Kinross  
Bollard to restrict
vehicular between
streets
Direction signs Westfield, Kinross-
shire   Haulage route signs
Regulatory
signs
Burns Begg Street,
Kinross  
Give Way signs and
junction markings
Traffic signals
Main Street/School
Road junction,
Crook of Devon  
Completion of traffic
signals project 
Traffic signals Drum crossroads   Traffic signals
Vehicle-
activated sign Cleish East   Ongoing VAS
programme
Vehicle-
activated sign Cleish West   Ongoing VAS
programme
Vehicle-
activated sign Gairneybank North   Ongoing VAS
programme
Vehicle-
activated sign Gairneybridge North   Ongoing VAS
programme
Vehicle-
activated sign
Gairneybridge
South  
Ongoing VAS
programme
Vehicle-
activated sign
Springfield Road
East, Kinross  
Ongoing VAS
programme
Vehicle-
activated sign
Soringfield Road
West, Kinross  
Ongoing VAS
programme
Vehicle-
activated sign Tillyochie East   Ongoing VAS
programme
Vehicle-
activated sign Tillyochie West   Ongoing VAS
programme
Vehicle-
activated sign
Wester Balgedie
North  
Ongoing VAS
programme
Vehicle-
activated sign
Wester Balgedie
South  
Ongoing VAS
programme
Warning signs Old Gullet Bridge,
Scotlandwell  
Double Bend Ahead
warning signs
Warning signs New Gullet Bridge,
Scotlandwell  
Double Bend Ahead
warning signs

Page 5

6.  PROGRAMME SUMMARY 
6.1  The Committee is asked to note the progress on the following road safety
measures: 
(i)  30mph speed limits being installed at Drum and Auchmuirbridge 
(ii)  40mph speed limits being installed at Scotlandwell/Auchmuirbridge,
Crook of Devon, Drum and Blairingone
(iii)  School Keep Clear markings being installed at Station Road for Kinross
Primary School
(iv)  Waiting restrictions being installed within the car park at Kinross Primary
School to discourage unauthorised parking and prevent obstruction. 
(v)  Bollard being installed at Lathro Lane in Kinross, warning signs at New
Gullet Bridge and Old Gullet Bridge south of Scotlandwell, and direction
signs along the B9097 East for Westfield.
(vi)  Traffic signals installed at School Road/Station Road in Crook of Devon
and at Drumm crossroads 
(vii)  Vehicle-activated signs installed at Cleish, Gairneybank, Gairneybridge,
Tillyochie, Wester Balgedie and Springfield Road in Kinross 
7.  CONCLUSION 
7.1  The introduction of the various speed limits and road safety projects contained
within this report will inform drivers of potential hazards on the road layout
ahead and enable them to adjust their speed and position accordingly.  Greater
awareness of the road environment, combined with improved speed
management, will reduce the risk of conflict between the various road users.  A
further update will be provided to the Committee at a future meeting. 
Author
Name Designation Contact Details
Daryl McKeown Road Safety Officer 01738 475000
ComCommitteeReports@pkc.gov.uk 
Approved
Name Designation Contact Details
Mark Butterworth Head of Environmental
& Consumer Services
January 2024