PERTH AND KINROSS COUNCIL 
Kinross-shire Area Committee 
16 February 2023 
ROAD SAFETY UPDATE
(Report No 23/55) 
1. PURPOSE OF REPORT 
1.1 The purpose of this report is to advise members of progress on the various
road safety concerns raised about the public road network in Ward 8 raised
with officers prior to the meeting. 
2. RECOMMENDATIONS 
2.1 It is recommended that Committee: 
• Debates the proposals set out at section 6 of this report.
• Reaches a consensus on the actions to be taken, either through debate or
by way of vote.
• Asks officers to carry out the works agreed by committee.
• Requests that an update be brought to a future committee meeting 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background/Main Issues 
• Section 5: Issues and Concerns
• Section 6: Proposals 
• Section 7: Conclusion
• Appendices 
4. BACKGROUND 
4.1 Perth and Kinross Council’s road safety projects assessment criteria provides
a procedure for prioritising traffic management and road safety projects. This
was approved by the E&I Committee in March 2019 (E Report No. 19/83
refers). All potential schemes are assessed and, if considered appropriate,
ranked against other projects to ensure those schemes that deliver the
greatest benefit to local communities are delivered first. With each financial
year, projects are assigned to the relevant programme of works and budget,
then installed as resources permit.

Page 2

4.2 Therefore, whilst one area may have a number of road safety priorities, these
need to be assessed and considered alongside priorities identified in other
areas. 
4.3 The list of proposed projects is based on a technical assessment of the road
usage and road environment. The assessment criteria does not take into
account community concerns about perceived road safety. The Traffic &
Network Team meets with the Ward Councillors every three months to review
the list and identify community priorities. In some circumstances some of
these preferred schemes that may have a lower ranking can be progressed
first to address community concerns if there is elected member support.     
5. ISSUES AND CONCERNS 
20mph speed limits 
5.1 Work is ongoing on the preparation of the full Traffic Regulation Orders to
make the following temporary 20mph speed limits permanent, after
consultation with the local elected members and community councils. The
legal process will be undertaken this Spring and installation is scheduled for
this Summer. 
• Crook of Devon north
• Crook of Devon south
• Drum
• Glenfarg village centre
• Kinross town centre extension
• Maryburgh & Keltybridge
• Milnathort town centre extension
• Scotlandwell 
30mph speed limits 
5.2 Work is ongoing on the preparation of the full Traffic Regulation Orders to
make the following temporary 30mph speed limits permanent, after
consultation with the local elected members and community councils. The
legal process will be undertaken this Spring and installation is scheduled for
this Summer. 
• Easter Balgedie
• Wester Balgedie 
5.3 Work is ongoing on the preparation of the full Traffic Regulation Orders to
create the following new 30mph speed limits, after consultation with the local
elected members and community councils. The legal process will be
undertaken this Spring and installation is scheduled for this Summer.

Page 3

• Auchmuirbridge
• Carnbo
• Gallowhill Road, Kinross, extension
• Glenfarg south 
40mph speed limits 
5.4 Work is ongoing on the preparation of the full Traffic Regulation Order to
make the following temporary 40mph speed limits permanent, after
consultation with the local elected members and community councils. The
legal process will be undertaken this Spring and installation is scheduled for
this Summer. 
• Maryburgh north 
5.5 Work is ongoing on the preparation of the full Traffic Regulation Orders to
create the following new 40mph speed limits, after consultation with the local
elected members and community councils. The legal process will be
undertaken this Spring and installation is scheduled for this Summer. 
• Drum east extension
• Scotlandwell to Auchmuirbridge 
School Keep Clear markings 
5.6 Work is ongoing on the preparation of the full Traffic Regulation Order to
create the following School Keep Clear parking restriction after consultation
with the Head Teacher and local elected members.  The legal process will be
undertaken this Spring and installation is scheduled for this Summer. 
• Station Road, Kinross at Kinross Primary School 
Waiting restrictions 
5.7 Work is ongoing on the preparation of the full Traffic Regulation Orders to
create the following waiting restrictions for double yellow lines after
consultation with the Head Teacher and local elected members. The legal
process will be undertaken this Spring and installation is scheduled for this
Summer. 
• Kinross Primary School car park
• Muirs/The Sycamores junction 
Kinross Town Centre Regeneration scheme 
5.8 A site inspection was undertaken on 13 January 2023 with the local elected
members and council officers from Business & Place Development,

Page 4

Community Greenspace and Traffic & Network Services to assess community
concerns about road safety and unauthorised parking.   
5.9 Give Way markings and road sign will be installed on Burns Begg Road,
approaching the High Street junction, along with an advanced direction
(map) sign informing drivers of the road layout ahead and showing High
Street as the priority route.  These will be installed as soon as practically
possible. 
5.10 The adopted status of the area of ground in the restricted parking zone around
the old town hall, between the carriageway and the building line, on both sides
of the road, will be investigated.  If adopted, there will be further discussion
regarding enforcement.  If unadopted, there will be further discussion
regarding adoption and future use of these areas.   
5.11 The possibility of planters on the widened footway on the east side of the High
Street, outside the Salutation Hotel, will be investigated by Community
Greenspace.  Consideration will have to be given to cost of installation and
on-going maintenance.  Un-impeded pedestrian movement must be retained. 
5.12 The possibility of planters being placed strategically within the shared space
with a  view to helping to define the pavement areas will be investigated by
Community Greenspace.  Consideration will have to be given to cost of
installation and on-going maintenance.  Un-impeded pedestrian movement
must be retained. 
5.13 The request for a second priority system on High Street will be investigated
north of the Montgomery Street junction.  If considered appropriate as a speed
reduction measure, it will be assessed, ranked and added to the list of future
road safety projects, then installed as resources permit.   
5.14 Concern has been expressed about the volume and speed of traffic along the
High Street.  The Council currently has traffic survey data before and after the
scheme was implemented (one before and two after) the scheme was
implemented.  This  provides us with traffic volumes, vehicle speeds, direction
of flow and categories of  vehicles.  Traffic volumes pre- and post-
construction exceed 4,000 vehicles per day.  Vehicle speeds are generally at,
or close to, the maximum permitted speed limit; although the perception of
speed by the local community is higher.  The surveys do not provide
information on the volume of traffic travelling along the High Street area 
without stopping in the town centre, some of which could be using the western
relief  road.  The Traffic & Network team will get quotes for an Origin &
Destination (OD) survey.   
5.15 Additional traffic survey data would enable the Council to develop plans to
reduce the volume of traffic going through the shared space.  There is
currently signage advising approaching drivers that Junction Road/Clashburn
Way is the alternative route “avoiding town centre”.  The signs are located at
the B918 Station Road/Junction Road junction for traffic coming from the west
(M90 and A977), and at the B996 High Street/Clashburn Way junction for

Page 5

traffic coming from the south (B996).  The signs will be reviewed and, if
necessary, upgraded to make the information more prominent. 
6. PROPOSALS 
6.1 The Committee is recommended to endorse the following road safety
measures are proposed: 
(i) 20mph speed limits will be installed at Crook of Devon, Drum, Glenfarg,
Keltybridge, Kinross Maryburgh, Milnathort and Scotlandwell.  
(ii)  30mph speed limits will be installed at Auchmuirbridge, Carnbo, Easter
Balgedie, Gallowhill Road, Glenfarg and Wester Balgedie. 
(iii)  40mph speed limits will be installed at Drum, Maryburgh and from 
Scotlandwell to Auchmuirbridge. 
(iv)  School Keep Clear markings will be installed at Station Road for
Kinross Primary School. 
(v)  Waiting restrictions will be installed within the car park at Kinross
Primary School and at Muirs/The Sycamores to discourage
unauthorised parking and prevent obstruction. 
(vi)  Give Way markings and road sign will be installed on Burns Begg
Street at High Street junction. 
(vii)  The adopted status of the area of ground behind the footway in
the restricted parking zone will be investigated before any
decision about future use is taken.
(viii)  The use of planters to define the pedestrian walkway at the Salutation
Hotel and outside the old town hall will be investigated. 
(ix) The introduction of a traffic priority system on High Street, north of the
Montgomery Street junction, will be investigated.   
(x) Travel patterns, traffic surveys and road signage will be reviewed to
develop plans to reduce the volume of traffic going through the shared
space.   
7. CONCLUSION 
7.1  The introduction of the various speed limits and signs contained within this
report will inform drivers of potential hazards on the road layout ahead and
enable them to adjust their speed and position accordingly. Greater
awareness of the road environment, combined with improved speed
management, will reduce the risk of conflict between the various road users.

Page 6

Author
Name  Designation Contact Details 
Daryl McKeown  Traffic and Network  (01738) 475000
ComCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities) 
26 January 2023