CATCH – Loch Leven  (Report No. 22/289)
An overview – October 2022  David Cairns 
Introduction
A community group has been established called CATCH – Loch Leven, (Climate Action Through
Community Heating), with its website https://catch-lochleven.org. This working group is intended to
be short lived (perhaps one year) and exploratory in nature, either showing a path to a subsequent
operating vehicle, or halting with a negative conclusion about the wisdom of continuance. A good
outcome is to justify and secure funding to commission a credible, commercial feasibility study to
support subsequent development and implementation plans.
CATCH Goal
To describe the cost, benefits, and challenges, for all stakeholders, of implementing a District
Heating (DH) system which can reduce the energy costs for the community of Kinross and Milnathort
(the Towns).  Along with utilising other sources, this could draw heat from Loch Leven, with
potentially helpful consequences for the stressed ecosystem of the internationally significant nature
reserve.
Motivation
Arguably, we are currently in a Climate Emergency, with international ambition to head quickly to
NetZero emissions.  Alongside this, there are strong economic pressures which act unequally on
different segments of the population. People are hurting.
By acting together, we believe that we make a bigger difference to address cost of living issues while
also reducing our impact on climate change, beyond that which individual efforts can achieve.
What is a District Heating system?
District Heating systems are much more commonplace on the continent than in the UK, following
different responses to the 1973 energy crisis, where the UK had access to ‘cheap’ gas from the North
Sea. 
DH systems comprise two separate elements:
• A distribution network of pipes carrying heat to individual houses, community buildings and
commercial businesses. Installing this would necessitate disruption of the streets, but the
network would typically have a working life of many decades, protecting the incomes of
families in the Towns.
• An Energy Centre, which can be physically modular and distributed. This may also
incorporate storage elements to mitigate the daily or seasonal availability of energy from
renewable sources.
While the easiest integration with old boiler/radiator systems is using high temperature heat (80oC),
recent systems, seeking to reduce transmission losses, have tended to reduce supply temperature
relying on more local step up for household requirements. Newer, well-insulated housing stock,
ideally with underfloor heating, can work effectively with 35-50oC heat.  The choice of operating
temperature for the network drives the cost of integration for households, capex and operating
costs for the system, and the simplicity of connecting a multiplicity of renewable heat sources. There
are big ramifications for the funding logic and the hurdles limiting adoption according to the balance
of ‘grid’ and household investment.

Page 2

CATCH – Loch Leven  
An overview – October 2022  David Cairns
As there is a mix of housing build standards in these Towns, including historic architecture in the
conservation area, implementing highly effective insulation may be difficult, so street or estate level
step-up for local delivery of higher temperatures may be appropriate. 
Looking round the Towns, there are many sources of potential energy consistent with supporting
such a network, including the Loch, wastewater treatment, commercial properties which generate
waste heat as a by-product of their processes, the ice rink, community roofs which could take solar
PV etc.
Ownership of DH schemes follow different approaches. Strong community involvement has potential
to deliver significant ongoing benefits for the Towns into the future, reinvesting any profits.
Benefits Sought
A soundly implemented DH system has potential to deliver many benefits, including:
• Low-cost heating for residents, businesses, and community premises. This is about
economies associated with larger scale systems.
• Move the CO2 emissions needle significantly, by replacing gas with renewable sources of
heat, providing access to green technologies for more people.
• Cooling the Loch, reversing some of the impacts of climate change, in a way which might be
a positive exemplar of what could be done elsewhere.
• Acting on this, perhaps in a Community Development Trust manner, might stimulate richer
community involvement and further projects, making the Towns more attractive places to
live, creating local jobs too.
Risk Factors to be Managed
There are many challenges to be described and effective solutions identified, including:
• Complexity of stakeholders – there are many with widely varying needs
• Protection of the Loch. Any envisaged system must do no harm to the ecosystem, indeed,
should deliver positive impact for the RAMSAR Nature Reserve.
• Land and access agreements. Infrastructure needs to be placed at relevant positions,
requiring agreement of landowners, planning authorities etc.
• Ownership. The community should have a strong role in this, to help support a high buy-in
level for energy usage, assuring access to lower cost finance options and coping with
implementation disruption.
• Insulation of housing stock. A deliberate programme to be “DH ready” will be required,
supporting folks with limited capital and/or motivation or just because it is difficult to do, to
improve their house energy efficiency.
• The economics must work for heat users. There are alternative individual approaches. The
DH route must be demonstrably better. It must be fundable.
Forward Path
CATCH is currently working to describe elements of the case, with the aim of being able to identify a
relevant partner for the feasibility study, shape good questions to be answered by it and to secure
the necessary funding.  
With an initial rounded description, assuming there is a plausibly positive argument, key
stakeholders can be approached to clarify any blocking issues needing careful and creative solutions.

Page 3

CATCH – Loch Leven  
An overview – October 2022  David Cairns 
Work continues to:
• Identify good models to describe the sustainable heat capacity of the Loch
• Search for literature which can help illuminate the potential for ecosystem benefits resulting
from temperature reduction
• Extract a street-by-street analysis of heat needs which, along with pipe lengths, should
enable a first pass estimate of the size, costs, and plausible viability of the scheme, and
clarify those relative to the contra-factual case of alternative available energy approaches.
• Communicate with stakeholders, including outreach to residents about likely engagement
levels. This is not a difficult story to communicate – provided the numbers are right.
Ideally, we will be in position to commission a sound feasibility study before the end of the first half
of 2023. 
Further Reading 
Comparison of 4th and 5th generation District Systems
Looks at the economics of existing systems in Copenhagen and London and the influence of
operating temperature.
https://www.researchgate.net/publication/350508808_Comparison_of_4th_and_5th_generation_di
strict_heating_systems 
A Scottish DH system
Queen’s Quay in Clydebank is up and running as a 5th generation network. Funded by the Scottish
Government and West Dunbarton Council, district heating underpins the regeneration activity.
https://www.queens-quay.co.uk/
https://www.vitalenergi.co.uk/our-work/queens-quay-heat-network-design/ 
Useful Resources
A good set of pertinent resources is available at
https://www.districtheatingscotland.com/resources/