Democracy Spraffa

Public reports pack

Argyll and Bute Council · 15 February 2023
Back to Planning, Protective Services and Licensing Committee — 15 February 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
8 February 2023 
NOTICE OF MEETING 
A meeting of the PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE will be
held BY MICROSOFT TEAMS on WEDNESDAY, 15 FEBRUARY 2023 at 11:00 AM, which you
are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTES 
(a) Planning, Protective Services and Licensing Committee held on 18
January 2023 at 11.00 am (Pages 3 - 8)  
(b) Planning, Protective Services and Licensing Committee held on 18
January 2023 at 2.00 pm (Pages 9 - 14)  
(c) Planning, Protective Services and Licensing Committee held on 18
January 2023 at 2.30 pm (Pages 15 - 22) 
4. ROSNEATH FARMS LTD: SITE FOR THE ERECTION OF DWELLINGHOUSE:
PLOT 7, LAND TO THE REAR OF LOCHEWE AND ARDLANISH, KILGREGGAN,
HELENSBURGH (REF: 21/00349/PPP) (Pages 23 - 46)  
Report by Head of Development and Economic Growth 
5. MR GRAHAM WYLIE: VARIATION OF CONDITION NUMBERS 3, 4, 5 AND 6 AND
REMOVAL OF CONDITIONS 7 AND 8 RELATIVE TO PLANNING PERMISSION
20/01150/PP (ERECTION OF DWELLINGHOUSE). ACCESS ARRANGEMENTS:
RHU LODGE, FERRY ROAD, RHU, HELENSBURGH (REF: 21/02709/PP) (Pages
47 - 90)  
Report by Head of Development and Economic Growth 
Public Document Pack

Page 2

6. THE SCOTTISH GOVERNMENT ON BEHALF OF ENERGIEKONTOR UK LTD:
ELECTRICITY ACT SECTION 36 CONSULTATION RELEVANT TO ROWAN WIND
FARM: LAND APPROXIMATELY 4.5KM NORTH WEST OF TARBERT, ARGYLL &
BUTE (REF: 22/00385/S36) (Pages 91 - 98)  
Report by Head of Development and Economic Growth 
7. SCOTTISH HYDRO ELECTRIC TRANSMISSION PLC: TO CONSTRUCT AND
OPERATE A 132/275 KILOVOLT (KV) GIS SUBSTATION AND ASSOCIATED
INFRASTRUCTURE THAT WILL CONNECT THE EXISTING 132 KV OVERHEAD
LINE (OHL) FROM TAYNUILT TO INVERARAY TO A PROPOSED 275 KV OHL TO
DALMALLY: LAND APPROXIMATELY 2.5 KM SOUTH WEST OF CLADICH,
ARGYLL AND BUTE (REF: 22/00728/PP) (Pages 99 - 130)  
Report by Head of Development and Economic Growth 
8. SCOTTISH HYDRO ELECTRIC TRANSMISSION PLC: CONSTRUCTION OF
APPROXIMATELY 13.3 KM OF 275KV OVER HEAD LINE (OHL) FROM
BETWEEN A PROPOSED SUBSTATION AT CREAG DHUBH TO THE EXISTING
SCOTTISH POWER ENERGY NETWORKS (SPEN) 275 KV OHL THAT RUNS
FROM DALMALLY TO INVERARNAN: LAND SOUTH OF DALMALLY AND EAST
OF CLADICH (REF: 22/01298/S37) (Pages 131 - 170)  
Report by Executive Director with responsibility for Legal & Regulatory Support 
9. THE SCOTTISH GOVERNMENT ON BEHALF OF DRAX CRUACHAN EXPANSION
LIMITED: ELECTRICITY ACT SECTION 36 CONSULTATION RELEVANT TO
CONSTRUCTION AND OPERATION OF NEW UNDERGROUND POWER
STATION AND ASSOCIATED INFRASTRUCTURE ADJACENT TO CRUACHAN 1
TO PROVIDE UP TO 600 MEGAWATTS (MW) OF ADDITIONAL NEW
GENERATING CAPACITY: CRUACHAN POWER STATION, LOCHAWE,
DALMALLY (REF: 22/01221/S36) (Pages 171 - 230)  
Report by Head of Development and Economic Growth 
10. PLANNING PERFORMANCE FRAMEWORK REPORT 2021/2022 (Pages 231 -
242)  
Report by Executive Director with responsibility for Development and Economic
Growth 
Planning, Protective Services and Licensing Committee 
Councillor John Armour Councillor Jan Brown
Councillor Audrey Forrest Councillor Kieron Green (Chair)
Councillor Amanda Hampsey (Vice-Chair)
Councillor Daniel Hampsey Councillor Graham Hardie
Councillor Fiona Howard Councillor Willie Hume
Councillor Mark Irvine Councillor Andrew Kain
Councillor Paul Donald Kennedy Councillor Liz McCabe
Councillor Luna Martin Councillor Peter Wallace   
Contact: Fiona McCallum, Committee Services Officer                  Tel. No. 01546 604392

Page 3

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE
held BY MICROSOFT TEAMS on WEDNESDAY, 18 JANUARY 2023 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Jan Brown
Councillor Amanda Hampsey
Councillor Daniel Hampsey
Councillor Graham Hardie
Councillor Fiona Howard
Councillor Willie Hume 
Councillor Mark Irvine
Councillor Andrew Kain
Councillor Paul Donald Kennedy
Councillor Liz McCabe
Councillor Luna Martin
Councillor Peter Wallace 
Attending: Stuart McLean, Committee Manager
Sandra Davies, Major Applications Team Leader
Howard Young, Area Team Leader – Helensburgh and Lomond
Arlene Knox, Senior Planning Officer
Emma Jane, Planning Officer
Raymond Kane, Traffic and Development Officer 
1. APOLOGIES FOR ABSENCE 
An apology for absence was received from Councillor Audrey Forrest. 
2. DECLARATIONS OF INTEREST 
Councillor Paul Kennedy declared a non-financial interest in item 4 on the Agenda (Mr
Graham Wylie: Variation of Condition Numbers 3, 4, 5 and 6 and Removal of Conditions 7
and 8 Relative to Planning Permission 20/01150/PP (Erection of Dwellinghouse).  Access
Arrangements: Rhu Lodge, Ferry Road, Rhu, Helensburgh (Ref: 21/02709/PP)), as he
was acquainted with the Applicant.  He advised that he would remain in the meeting but
take no part in the consideration of this application. 
3. MINUTES 
a) The Minute of the Planning, Protective Services and Licensing Committee held on 15
November 2022 was approved as a correct record. 
b) The Minute of the Planning, Protective Services and Licensing Committee held on 23
November 2022 was approved as a correct record. 
c) The Minute of the Planning, Protective Services and Licensing Committee held on 9
December 2022 was approved as a correct record. 
d) The Minute of the Planning, Protective Services and Licensing Committee held on 21
December 2022 at 2.00 pm was approved as a correct record. 
e) The Minute of the Planning, Protective Services and Licensing Committee held on 21
December 2022 at 2.30 pm was approved as a correct record. 
Page 3 Agenda Item 3a

Page 4

f) The Minute of the Planning, Protective Services and Licensing Committee held on 21
December 2022 at 3.00 pm was approved as a correct record. 
4. MR GRAHAM WYLIE: VARIATION OF CONDITION NUMBERS 3, 4, 5 AND 6
AND REMOVAL OF CONDITIONS 7 AND 8 RELATIVE TO PLANNING
PERMISSION 20/01150/PP (ERECTION OF DWELLINGHOUSE).  ACCESS
ARRANGEMENTS: RHU LODGE, FERRY ROAD, RHU, HELENSBURGH (REF:
21/02709/PP) 
At the PPSL Committee on 23 November 2022 it was agreed to continue consideration of
this application and instruct Officers to make arrangements for the Committee to
accompany Planning and Roads Officers on a site visit which subsequently took place on
12 January 2023.   
The Area Team Leader advised that he had received an email from the Applicant on 17
January 2023 intimating that he would like to submit further amended plans to address
issues raised within supplementary report number 3.  The Applicant sought continuation of
this application to the February PPSL Committee to give him time to submit these revised
plans.   
Decision 
The Committee agreed to continue consideration of this application to the PPSL
Committee in February 2023. 
(Reference: Report by Head of Development and Economic Growth dated 8 November
2022, supplementary report number 1 dated 22 November 2022, supplementary report
number 2 dated 10 January 2023 and supplementary report number 3 dated 16 January
2023, submitted) 
Councillor Luna Martin joined the meeting during consideration of the foregoing item. 
5. THE SCOTTISH GOVERNMENT ON BEHALF OF AECOM LIMITED (ON
BEHALF OF RWE RENEWABLES UK ONSHORE WIND LTD): ELECTRICITY
ACT SECTION 36 CONSULTATION RELEVANT TO CLACHAIG GLEN WIND
FARM AND BATTERY STORAGE: APPROXIMATELY 20KM NORTH OF
CAMPBELTOWN AND 1.8KM NORTH-EAST OF MUASDALE ON THE WEST
COAST OF KINTYRE (REF: 22/00613/S36) 
The Senior Planning Officer spoke to the terms of the report and to supplementary report
number 1 which advised that the Scottish Parliament had approved National Planning
Framework 4 (NPF4) on 11 January 2023 and that it was the intention of Scottish
Ministers to adopt and publish NPF4 on 13 February 2023 with NPF3 and Scottish
Planning Policy superseded from that date.  The status of NPF4 did not alter the Officer
recommendation in the report as the revised Draft NPF4 was considered in the
determination of the proposal and was referenced in the report. 
In Scotland, any application to construct or operate an onshore power generating station,
in this case, a renewable energy development with an installed capacity of over 50
megawatts (MW) requires the consent of Scottish Ministers under Section 36 of the
Electricity Act 1989.  Any ministerial authorisation would include a ‘deemed planning
permission’ and in these circumstances there is then no requirement for a planning
application to be made to the Council as Planning Authority.  The Council’s role in this
Page 4

Page 5

process is one of a consultee along with various other consultation bodies.  It is open to
the Council to either support or object to the proposal, and to recommend conditions it
would wish to see imposed in the event that authorisation is given by the Scottish
Government.   
The proposed development site lies within the Upland Forest Moor Mosaic Landscape
Character Type identified in the Argyll & Bute Landscape Wind Energy Capacity Study.  In
terms of the Local Development Plan proposals map, the proposed wind farm and access
is located within the ‘Rural Opportunity Area’, ‘Countryside Zone’, and the ‘Very Sensitive
Countryside Zone’. 
This report reviews the policy considerations which are applicable to this proposal and the
planning merits of the development, the views of bodies consulted by the Scottish
Government along with other consultations undertaken by the Council, and third party
opinion expressed to the Scottish Government. 
It is recommended that the Council raise an objection to this Section 36 consultation on
Landscape & Visual Grounds for the reasons detailed in the report of handling and that
the Scottish Government be notified accordingly.  The Committee were also asked to note
that an objection from the Council would instigate the requirement for a Public Local
inquiry to be held. 
Decision 
The Committee agreed on behalf of the Council, as Planning Authority to object to this
proposal for the following reason and that the Scottish Government be notified
accordingly: 
1. Landscape & Visual Impact (including cumulative) 
Argyll & Bute Council assesses development proposals with the aim of protecting
conserving and where possible enhancing the built, human, and natural environment.
A development proposal will not be supported when it does not protect, conserve or
where possible enhance the established character and local distinctiveness of the
landscape in terms of its location, scale, form, and design. Argyll & Bute Council will
resist renewable energy developments where these are not consistent with the
principles of sustainable development and it has not been adequately demonstrated
that there would be no unacceptable significant adverse landscape and visual impacts,
whether individual or cumulative. 
The proposed site lies within the Upland Forest Moor Mosaic LCT identified in the
Argyll & Bute Landscape Wind Energy Capacity Study (LWECS). This landscape has
some characteristics which reduce sensitivity to large scale wind energy development
including a generally simple landform and land cover and an expansive scale.
However, these uplands already accommodate a number of operational and
consented wind farms which limits scope for further wind farm development whilst
minimising effects on more sensitive landscape and visual receptors within the Kintyre
coasts, West Loch Tarbert, and the islands of Gigha and Arran. 
This proposal would have significant adverse effects on the character of the Upland
Forest Moor Mosaic LCT. It would also significantly and adversely affect the character
of the Sound of Gigha between Gigha and Kintyre. There would be relatively limited
views from the settled east and west coasts of Kintyre but with more extensive visibility
Page 5

Page 6

occurring across the Sound of Gigha, Gigha and from the more sparsely settled upland
area immediately surrounding the proposed development. 
A consent for 14 turbines between 115.5m and 126.5m applies to the site. This
proposal comprises 12 turbines between 185m and 200m. The principal change
between the consented and proposed scheme is the greater degree of intrusion
associated with the substantially larger turbines now proposed on views from the
Sound of Gigha and from the eastern side of Gigha, and also in close views from a
section of the Kintyre Way. The visible aviation lighting fixed to 8 of the proposed
turbines would also be likely to extend the duration of significant adverse visual effects
experienced from these same locations. In views from Gigha and the Sound of Gigha
the proposal would be significantly larger than other operational and consented wind
farms and would form a key focus in views towards the Kintyre peninsula, detracting
from the scenic character of water, settled coastal fringe and uplands. 
The potential cumulative effects of this proposal with the Sheirdrim and Narachan
application-stage wind farms are additionally of concern as together these schemes
would dominate views to the east from the north-eastern part of Gigha. Lighting of the
Narachan wind farm and this proposal could extend the duration of significant adverse
cumulative effects during hours of darkness. 
Argyll & Bute Council therefore objects to this proposal on landscape and visual
grounds. There could be scope to mitigate the effects of this proposal through a
reduction in the size of turbines and possible omission/reposition of more prominent
turbines (for example Turbines 1 and 3 which are particularly prominent in views from
the west). Further mitigation of visible aviation lighting should also be considered
through the installation of an Aircraft Detection Lighting System once approved by the
CAA which would significantly reduce the duration of lighting. 
Having due regard to the above it is concluded that the proposal will have
significant adverse landscape and visual impacts (including cumulative) and is
therefore inconsistent with the provisions of: SG LDP ENV 14 –Landscape; SG 2
Renewable Energy; LDP STRAT 1 – Sustainable Development; LDP DM1 –
Development within the Development Management Zone; LDP 3 – Supporting
the Protection, Conservation and Enhancement of our Environment; Policy LDP
6 – Supporting the Sustainable Growth of Renewables; of the Argyll & Bute
Local Development Plan; SPP (2014); NPF3; Policy 4 – Natural Places and Policy
11 – Energy of Revised Draft NPF4; the Onshore Wind Policy Statement, (2022);
and guidance contained in the Argyll & Bute Landscape Wind Energy Capacity
Study 2017. 
Notes for the Energy Consents Unit 
Battery Storage – Whilst, the provision of battery storage meets the requirements of
policy, Officers are concerned that no consideration has been given to the Landscape
& Visual Impact of this battery storage facility. This is a large facility of 27 shipping
containers proposed to be located in a rural landscape. Before a decision is reached
on this proposal by the ECU it is the view of Argyll & Bute Council that the impacts of
this needs to be considered. 
Noise – Argyll & Bute Council would be grateful to receive clarification from the
Applicant in respect to the points raised by the Noise Consultant on residential
receptors and fixed limits.
Page 6

Page 7

(Reference: Report by Head of Development and Economic Growth dated 4 January 2023
and supplementary report number 1 dated 17 January 2023, submitted) 
6. UPDATE ON RECENT SCOTTISH GOVERNMENT PLANNING APPEAL
DECISION 
A report providing an update on the recent decision by The Planning and Environmental
Appeals Division in relation to Planning Appeal Reference PPA-130-2084 in respect of the
construction of Creag Dhubh Wind Farm at Creag Dhubh, North East of Strachur Village,
was before the Committee for information. 
Decision 
The Committee noted the contents of the report. 
(Reference: Report by Head of Development and Economic Growth dated 21 December
2022, submitted) 
Page 7

Page 8

This page is intentionally left blank

Page 9

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE
held BY MICROSOFT TEAMS on WEDNESDAY, 18 JANUARY 2023 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Jan Brown
Councillor Amanda Hampsey
Councillor Daniel Hampsey
Councillor Graham Hardie
Councillor Fiona Howard 
Councillor Willie Hume
Councillor Mark Irvine
Councillor Andrew Kain
Councillor Paul Donald Kennedy
Councillor Liz McCabe
Councillor Peter Wallace 
Attending: Stuart McLean, Committee Manager
Fiona Macdonald, Solicitor
Kevin Oliphant-Smith, Applicant
Sergeant David Holmes, Police Scotland 
1. APOLOGIES FOR ABSENCE 
An apology for absence was received from Councillor Audrey Forrest. 
2. DECLARATIONS OF INTEREST 
Councillor Paul Donald Kennedy advised that he held a Taxi Driver’s Licence and
operated in the Helensburgh and Lomond area.  He stated that as this application was for
the Bute and Cowal area he felt this would not prevent him from taking part in this hearing. 
3. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: APPLICATION FOR GRANT OF
A TAXI DRIVER LICENCE (K OLIPHANT-SMITH, DUNOON) 
The Chair welcomed everyone to the meeting.  In line with recent legislation for Civic
Government Hearings, the parties (and any representatives) were given the options for
participating in the meeting today.  The options available were by video call, by audio call
or by written submission.   
For this hearing the Applicant opted to proceed by way of video call and joined the
meeting by Microsoft Teams.  Police Scotland opted to proceed by way of audio call and
Sergeant David Holmes joined the meeting by telephone. 
The Chair outlined the procedure that would be followed and invited the Applicant to
speak in support of his application. 
APPLICANT 
Mr Oliphant-Smith referred to the 2008 conviction which had not been declared on his
application form and advised that he had not been aware that he had to declare it as he
thought it was spent.  He said that before submitting his application to the Council he had
attended Dunoon Police Station and took all his files with him.  This included his
Disclosure Certificate which detailed his convictions.  He advised that a Police Sergeant
had informed him that he did not think it would be necessary to add this conviction to the
application form but in the interests of transparency suggested that he should add a code. 
Page 9 Agenda Item 3b

Page 10

He said that he did not know the code and that the Police Sergeant had obtained this for
him and added it to the form.  He advised that he had been surprised that an objection
from Police Scotland had been received.  He said that he now had a clean driving licence
with no points and that he had no disqualifications. He said that he had received no other
convictions, cautions or reprimands over the last 9 years.  He advised that he held a Taxi
Driver Licence for the Isle of Man and presented a copy of this for the Committee to view. 
He advised that he’d had no problems, cautions or reprimands while holding this licence.
He said that it was his intention to move to Dunoon to be close to family and to contribute
to Dunoon and Argyll and Bute.  He referred to Argyll and Bute Council actively seeking
people to come and live and invest in the local area and that he was trying to do that.  He
advised that he had previously worked in government in 5 separate departments.  He
referred to working in local hospitals during Covid on the Isle of Man on various wards,
looking after vulnerable patients.  He said he was also undertaking a Law Degree through
the Open University which would take 5 or 6 years to complete and that this was very
much his future idea.  He also advised of previously being elected as a local authority
Councillor on the Isle of Man in 2016 in which he was a member of several Committees. 
POLICE SCOTLAND 
Sergeant Holmes advised that the submission by Police Scotland was not an objection. 
He said it was a representation to allow the Committee to make an informed decision in
respect of this application. 
He referred to the letter from the Divisional Commander dated 18 October 2022 which
advised that the Applicant had 2 convictions dated 16 December 2008 and 8 April 2014. 
Both of these convictions related to being in charge of a motor vehicle whilst over the
prescribed alcohol limit. 
MEMBERS’ QUESTIONS 
Councillor Brown referred to Mr Oliphant-Smith’s conviction in 2014 which resulted in him
being banned from driving for 6 years.  She sought and received confirmation from Mr
Oliphant-Smith that this ban was lifted in 2020 and that he had only been driving regularly
for the past 2 years and that this would be 3 years in April 2023. 
Councillor Kain sought and received confirmation from Mr Oliphant-Smith that he received
his Taxi Driver Licence for the Isle of Man last year. 
Councillor Kennedy asked Mr Oliphant-Smith why he had not declared his 2008 conviction
on his application form.  Mr Oliphant-Smith said that he had been confused between
English and Scottish legislation regarding spent convictions. 
Councillor Kennedy pointed out that Mr Oliphant-Smith had been charged twice for being
in charge of a vehicle but not for driving.  He commented that these sentences appeared
quite severe for these charges.  He asked Mr Oliphant-Smith to explain why he was
banned from driving for so long.  Mr Oliphant-Smith advised that Isle of Man laws were a
lot stricter and came down harshly on any crimes.  He said that in respect of the 2008
conviction, he advised that even though it stated ‘in charge of a motor vehicle whilst over
the prescribed alcohol limit’, he was driving.  He said that he had been just over the limit
as he had not eaten all day.  He advised that the Sergeant who breathalysed him had said
that if he had eaten a sandwich during the day he would have been under the limit.  Mr
Oliphant-Smith confirmed that in respect of the 2014 conviction he was not driving and
that he was in the back seat of the vehicle.  The Police Officers who charged him made
Page 10

Page 11

the decision that this was a crime and the Courts followed the process that for 2 alcohol
related offences within a 5 year period they had to issue the toughest sentence they could
give. 
Councillor Kennedy queried the difference between Scottish and English alcohol limits and
asked which limits the Isle of Man used.  Mr Oliphant-Smith said he believed that the Isle
of Man had its own limits.  He said that based on the limit of 35 micrograms of breath, the
reading for his first conviction was 36.4 micrograms. 
Councillor Kennedy referred to the cost of car insurance for taxi driving and suggested Mr
Oliphant-Smith’s might be quite high as a result of these convictions.  Mr Oliphant-Smith
said that his driving licence was clear with no penalty points and that car insurers did not
consider convictions that were more than 5 years ago. 
Councillor Hume asked Mr Oliphant-Smith what his breathalyser reading was in 2014.  Mr
Oliphant-Smith said he could not remember but he thought that it was a bit higher than in
2008.  He said that the driving ban was not down to the reading but because of the
proximity in time between the 2 drink driving convictions.  He advised that if the reading
had been high, based on guidance, he would have received a custodial sentence. 
Councillor Armour said he had noted from the Police letter that Mr Oliphant-Smith had to
retake his driving test and attend a drink driving rehabilitation course.  He asked Mr
Oliphant-Smith to advise when he attended this course and what it had entailed.  Mr
Oliphant-Smith said he attended the course in November 2014 and that it was a one day
course, sitting in a classroom watching YouTube videos of American Police Officers
showing car crashes in America in the 1980s.  He advised that he did not find the course
particularly helpful.  He commented that it would be beneficial if they came up with a good
rehabilitation course or education course which could be shown to young drivers before
they got their licences.  He said that would be useful and that he had suggested this in a
letter to the Court following his attendance at the rehabilitation course.  Mr Oliphant-Smith
advised that he did not just lose his licence, he had also lost his job and that this had
affected his family.  He advised that educationally this conviction had been a very good
lesson for him and something that he would like to put to use. 
Councillor Brown asked if Mr Oliphant-Smith had undertaken any other counselling.  Mr
Oliphant-Smith said he did have counselling.  He advised of losing a son just before the
2014 conviction and that he had been suffering from anxiety and depression, which he did
not recognise at the time, and which led to him self-medicating with alcohol.  Losing his
licence led him to seek help and counselling.  He added that when he started working in
the hospital in 2020 he was sent on other counselling courses as a staff member in order
to help patients.  He said that these courses had also helped him. 
Councillor Green referred to the dates of the convictions and asked Mr Oliphant-Smith to
confirm when the offences took place.  Mr Oliphant-Smith said that for the April 2014
conviction he believed the incident took place in March 2014.  He said that for the 2008
conviction he was in Court the same day. 
Councillor Green asked Mr Oliphant-Smith how his use of alcohol had changed since
these convictions.  Mr Oliphant-Smith referred to being older now and having other
responsibilities.  He said the idea of going for drink was no longer worth it.  He said he had
a son to look after and had to think ahead if he would need to drive the next day or think
about whether he would want a hangover.  Referring to his mental health, he said that if
he did take a couple of drinks he found he did not feel great for a couple of days after.  He
Page 11

Page 12

advised that after driving taxis on the Isle of Man, he decided to stop drinking altogether. 
He said that when you started as a taxi driver you were learning every day and were
responsible for picking up people with very small children, and vulnerable people going to
hospital, some of whom required assistance in and out of the car.  He said you could not
do any of these tasks if under the influence of alcohol from the night before and that it was
not safe. 
Councillor Green sought and received confirmation from Mr Oliphant-Smith that he was 22
and 28 years old when the offences took place and that he was now 36 years old. 
Councillor Kennedy referred to Mr Oliphant-Smith receiving his Taxi Driver Licence on the
Isle of Man and asked if he had to attend a Committee to obtain his Licence.  He also
asked what types of Committee Mr Oliphant-Smith sat on when he was a Councillor.  Mr
Oliphant-Smith confirmed that he had to attend a meeting of the Road Traffic Licensing
Committee which was an independent body separate from the Council.  He advised that
when he was a Councillor the Committee he sat on overseen beach management and
waste management.   
Councillor Kennedy asked Mr Oliphant-Smith if the Committee that granted his Taxi Driver
Licence had discussed his convictions in a severe manner.  Mr Oliphant-Smith said that
the Committee had been quite harsh.  He said that the meeting had been adjourned after
an hour and that he had been called back for a second meeting . He said the whole
process took 4 months.  He said that it was worse than going to court.  He advised that
the process followed by Argyll and Bute Council was a lot easier and that everyone was a
lot nicer. 
Councillor Kennedy asked Mr Oliphant-Smith if there were any mitigating circumstances
that swayed the Isle of Man Committee to grant the licence.  Mr Oliphant-Smith referred to
his previous standing in the community, references from charities he worked with, and his
work in the local community.  He also referred to the fact that he had not been in any
trouble with the Police in 9 years and that it could be seen from his history that he had
turned his life around.  Mr Oliphant-Smith confirmed that if this Committee wished, he
could obtain references to support this application. 
Councillor Kennedy sought and received confirmation from Mr Oliphant-Smith that he was
not currently employed in Dunoon.  He said that he had parents in Dunoon who helped
and supported him.  He advised that if he could not gain any meaningful employment in
Dunoon he would need to consider moving elsewhere. 
Councillor Green sought and received confirmation from Mr Oliphant-Smith that he was in
politics for 10 years but was not a Councillor on the Isle of Man for very long.  He advised
that he had resigned from this post after 2 months due to being a victim of crime within the
Council. 
Councillor Hardie referred to Mr Oliphant-Smith using alcohol to self-medicate.  He asked
if life got stressful again would Mr Oliphant-smith go back to alcohol or if he had other
support mechanisms in place.  Mr Oliphant-Smith said he had not self-medicated because
of stress.  He referred to having a lot of symptoms at the time which later led to a
diagnosis of fibromyalgia which resulted in pain in the upper part of his back.  He said he
found that lifestyle changes were the best approach.  He said that alcohol was the worst
thing for that condition.  He said he had turned his life around in a health sense. 
Page 12

Page 13

SUMMING UP 
Police Scotland 
Sergeant Holmes advised that he had nothing further to add. 
Applicant 
Mr Oliphant-Smith thanked the Members for the opportunity to talk. 
When asked, both parties confirmed that they had received a fair hearing. 
DEBATE 
Councillor Kain said he was minded to approve this application.  He commented that the
Police submission was a representation and not an objection.  He said that bearing in
mind that the Isle of Man had stricter rules, Mr Oliphant-Smith was granted a Taxi Driver
Licence there 12 months ago, and that he was inclined to approve this application. 
Councillor Kennedy said he was very much of the same mind as Councillor Kain.  He
referred to the offences occurring some time ago, with the most recent one 9 years ago for
being drunk in charge.  He said that it appeared Mr Oliphant-Smith had turned a corner
and wanted to make a go of it and have a future in law.  He said he was minded to grant
this licence. 
Councillor Armour said he could not disagree with anything said by Councillors Kain and
Kennedy.  He commented that Mr Oliphant-Smith had given frank and full information as
requested.  He said he had done a bit of “googling” and could see that Mr Oliphant-Smith
had done a lot in helping out as a volunteer.  He advised that he thought that Mr Oliphant-
Smith was someone that had made mistakes and that he had learnt from these mistakes. 
He advised that he would not want to stop anyone from gaining employment and trying to
put the past behind them.  He confirmed that he fully supported granting this licence. 
Councillor Hume said that he totally agreed with his colleagues.  He advised that he
thought Mr Oliphant-Smith had been very transparent and honest and that he had no
objection to granting this licence. 
Councillor Daniel Hampsey said he was of the same mind.  He advised that as a Dunoon
Councillor it was good to have more people in business for the local economy.  He said
that Mr Oliphant-Smith had been very transparent with everything that had happened and
that he supported the granting of this licence. 
Councillor Hardie said that Mr Oliphant-Smith had been very open and honest and that he
had no problem with granting this licence. 
Councillor Green referred to Mr Oliphant-Smith being 22 and 28 years old when the
offences took place.  He commented that being older now, with different responsibilities,
Mr Oliphant-Smith gave the impression of having learnt his lesson regarding alcohol and
vehicles and in that respect he was happy to grant the licence. 
Page 13

Page 14

DECISION 
The Committee unanimously agreed to grant a Taxi Driver Licence to Mr Kevin Oliphant-
Smith and noted that he would receive written confirmation of this within 7 days. 
(Reference: Report by Head of Legal and Regulatory Support, submitted) 
Page 14

Page 15

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE
held BY MICROSOFT TEAMS on WEDNESDAY, 18 JANUARY 2023 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Jan Brown
Councillor Amanda Hampsey
Councillor Daniel Hampsey
Councillor Graham Hardie
Councillor Fiona Howard 
Councillor Willie Hume
Councillor Mark Irvine
Councillor Andrew Kain
Councillor Paul Donald Kennedy
Councillor Liz McCabe
Councillor Peter Wallace 
Attending: Stuart McLean, Committee Manager
Fiona Macdonald, Solicitor
Grayham Plumb, Applicant
Sergeant David Holmes, Police Scotland 
1. APOLOGIES FOR ABSENCE 
An apology for absence was received from Councillor Audrey Forrest. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. CIVIC GOVERNMENT (SCOTLAND) ACT 1982:  APPLICATION FOR GRANT OF
A STREET TRADER LICENCE (G PLUMB, DALMALLY) 
The Chair welcomed everyone to the meeting.  In line with recent legislation for Civic
Government Hearings, the parties (and any representatives) were given the options for
participating in the meeting today.  The options available were by video call, by audio call
or by written submission.   
For this hearing the Applicant opted to proceed by way of video call and joined the
meeting by Microsoft Teams.  Police Scotland opted to proceed by way of audio call and
Sergeant David Holmes joined the meeting by telephone. 
The Chair outlined the procedure that would be followed and invited the Applicant to
speak in support of his application. 
APPLICANT 
Mr Plumb said that he had moved up from England 12 months ago and was looking to
improve his lifestyle and mental health.  He advised that it had been a dream of his from
16 years old, to work in a catering van.  He said that he had seen a gap in the market and
that he was really passionate about doing this and had everything set up and ready to go. 
POLICE SCOTLAND 
Sergeant Holmes referred to a letter dated 18 October 2022 from the Divisional
Commander which advised that the Chief Constable objected to this application on the
Page 15 Agenda Item 3c

Page 16

grounds that the Applicant was not a fit and proper person to be the holder of a licence by
virtue of a conviction dated 12 February 2020 which related to assault occasioning actual
bodily harm. 
MEMBERS’ QUESTIONS 
Councillor Kain asked Mr Plumb to outline what the assault related to.  Mr Plumb advised
that he and a friend went to Wales for a night out and water sports.  A friend of his friend
also came along on the night out and that he did not know him at this point.  He advised
that they went out for a meal and a couple of beers and then on to a night club.  At closing
time they came out of the club and he saw 20 to 30 people, mainly girls, having a
squabble and scuffle.  He said that after 2 or 3 minutes he realised that the person that
had come out with him and his friend was in a fight.  He said he did not go near the fight. 
He advised that the boy his friend’s friend was fighting with came towards him with his
arms open and that he had taken this as a threat and threw a punch.  He said that the
Police arrived and he admitted to what had happened. 
Councillor Kain commented on the conviction being extreme for one punch.  He asked Mr
Plumb if there were other charges.  Mr Plumb advised that due to the person having the
fight first being a friend of his friend, and as he had fought with the same person, his
offence was put together with what the other person was charged with.  He advised that in
the Court they were charged with the same thing.  He said it was classed as if they had
both fought at the same time but it had not been like that. 
Councillor Armour asked Mr Plumb why he had not declared his conviction on his
application form when it clearly stated that all convictions should be declared.  Mr Plumb
said it had been an honest mistake and that he had nothing to hide.  He advised that when
the incident happened he was the first person to hold his hand up and admit fault.  He
referred to going through the application with his mum and girlfriend and that they had
thought that as the suspended sentence had been done there was no need to declare it. 
Councillor Armour referred again to the application form clearly stating that all criminal
convictions should be stated.  Mr Plumb said he could only apologise for not reading the
application properly, or misinterpreting it.  He said he was not trying to get away with
anything and that it was just a mistake. 
Councillor Brown referred to part 5 of the application which referred to the ownership of
land where the burger van would be sited.  She noted that Mr Plumb had indicated he was
not the owner of the land.  She sought and received confirmation from Mr Plumb that he
had received permission from the land owner via an email.  Mr Plumb advised that he had
forwarded this email 2 or 3 months back confirming he had permission. 
Councillor Brown sought and received confirmation from Mr Plumb that he had his Food
Hygiene certificate from Environmental Health.  He advised that there was another couple
of courses he would like to do to improve things and that he also had the experience of
working in catering vans for 3 or 4 years. 
Councillor Brown asked Mr Plumb what days and times he would operate as this detail
was not filled out on the application form.  Mr Plumb said he was not sure yet and that he
needed to work out when the best times would be for business.  He said he was thinking
about working Thursdays – Sundays from 8 am.  He hoped to provide for tourists as well
as locals. 
Page 16

Page 17

Councillor Brown asked Mr Plumb if the disposal of a suspended prison sentence for 48
weeks and compensation of £1,000 was just for him or if the other person got the same. 
Mr Plumb said the other person got a longer suspended sentence of a few more weeks. 
He did not receive a fine as he was on benefits and that he was given community service. 
Councillor Kennedy sought and received confirmation from Mr Plumb that the victim was
not hospitalised at the time of the incident.  Mr Plumb advised that if he remembered
correctly, the victim got 4 stitches the day after. 
Councillor Kennedy asked Mr Plumb how long before the conviction the offence occurred. 
Mr Plumb said the offence was in 2019 just before Covid.  He said that everything was
adjourned 3 or 4 times.  He advised that he had pled guilty right away but the other person
pled not guilty which caused a lot of problems.  He advised that at the last minute the
other person pled guilty.  He said there was no trial. 
Councillor Kennedy commented on Mr Plumb not declaring his conviction on the
application form and advised that as far as he could recollect failing to disclose a
conviction could lead to being charged with an offence.  He asked Mr Plumb if he had
been charged for not declaring his conviction and Mr Plumb said he had not been
charged. 
Councillor Kennedy sought clarity on whether a person could be charged for not declaring
a criminal conviction on their application form.  The Council’s Solicitor, Fiona Macdonald
referred to section 6 of the application form which advised that anyone giving a false
declaration could be liable to summary conviction or a fine not exceeding £2,500.  She
pointed out that this statement was directly before where the application was signed by
the Applicant. 
Councillor Kennedy queried whether Police Scotland had considered that option.  Mr
Plumb said that he had not tried to hide his conviction.  He acknowledged that it was a
huge error to leave it off the application form and that he wished he had not.  He said he
was not trying to get away with anything.  He said that he did the punishment and was
trying to get on better with things now. 
Councillor Howard commented that the letter of consent from the landowner was ticked off
as supplied on the application.  She sought and received confirmation from Mr Plumb that
he was set up and ready to apply for third party insurance if his licence was granted. 
Councillor Irvine sought and received confirmation from Mr Plumb that the extent of his
involvement in the incident was a single punch and that he had then surrendered to the
Police. 
Councillor Irvine referred to the publically available court report which stated something
different – it said that Mr Plumb had punched and kicked the person on the ground.  He
sought clarification on this from Mr Plumb.  Mr Plumb said that he had been tarnished with
the same brush as the other person.  He said that he was calm and that it was the other
person that was pulled away by security staff for kicking the victim on the ground. 
Referring to CCTV evidence, he advised that he had pointed out to the Police who he was
on the footage.  When it came to Court he thought it would be outlined who was who as all
you could see was a scuffle in the distance but this information was not provided.  He said
that he threw one punch. 
Page 17

Page 18

SUMMING UP 
Police Scotland 
Sergeant Holmes advised that he had nothing further to add. 
Applicant 
Mr Plumb thanked the Committee for hearing him out.  He said that he knew it would be
easy to look at what he had done and that it was not good.  He advised that he would like
it considered that what was on paper was not necessarily a person.  He advised that he
had changed his lifestyle and moved here for more tranquillity and peace of mind.  He said
his brain moved slower and this was the next step to keep progressing.  He thanked
everyone for listening. 
When asked, both parties confirmed that they had received a fair hearing. 
DEBATE 
Councillor Hardie advised that the fact that Mr Plumb had not declared his conviction on
his application form did not fill him with confidence and due to the seriousness of the
conviction he was minded to refuse the application. 
Councillor Armour sought clarification from Officers as to whether or not the application
was valid because the convictions were not declared and because there appeared to be
no physical evidence of permission from the land owner.  Ms Macdonald advised that it
would be up to Members based on what had been put forward by the Applicant.  She said
she would need to seek advice on the validity of the application.  She pointed out that she
understood there had been occasions in the past where convictions had been over looked
on applications and that the Police may have a view or not on that. 
Councillor Armour sought clarity on whether or not the email from the land owner had
been received by anyone.  Ms Macdonald advised that she would have expected that any
paperwork in relation to the application would have been forwarded to the licensing
section and that could be clarified.  She said she understood everything in respect of
Environmental Health was done and dusted in advance of the hearing today.  She said
there was no reason to believe that the email had not been sent but she did not have a
copy of it in front of her today.  She advised that in the interest of fairness the Committee
could decide to continue consideration of this application but that would be up to them. 
Sergeant Holmes advised that Police Scotland had received a copy of the email that the
Applicant had referred to.  Councillor Green commented that he was aware the land
owner had been advertising for someone to take this business on. 
Councillor Armour expressed his concern about whether or not the application was valid
and that he would be looking for a continuation.  With regard to the conviction, he said he
was split down the middle with that but he did have concerns. 
Councillor Hume advised that he thought the hearing should be continued as he did not
believe the Committee had all the facts and that he could not make a decision today. 
Page 18

Page 19

Councillor Kain agreed that there should be a continuation as the application was
incomplete in terms of dates and times of operation and that the Applicant had been a bit
vague about how often and how long he would operate. 
Councillor Howard said that she could not remember seeing all documents for other cases
and could not understand why the Committee should be demanding them now.  She
commented that the surroundings of a quiet car park would be quite different from a night
club and that she did not think Mr Plumb would get as wired up or mad as in a drunken
state outside a night club.  She said she was inclined to give him the benefit of the doubt. 
Referring to the days of operation, she advised that when starting a new business in a
new place you would not necessarily know until you actually started what hours and days
of business would be best.  She said that she thought the Committee should give Mr
Plumb the benefit of doubt and let him try it and see and if it didn’t work out the licence
could always be revoked. 
Councillor Kennedy said that he had sympathy for the Applicant but noted that the
conviction was fairly recent and had been omitted from the application form.   He said that
he would be keen to know if Mr Plumb would be operating the van by himself.  He said he
would like to give him a chance but it was pretty soon after that event. 
Councillor Brown said she was a bit conflicted.  She commented that Mr Plumb only had
the one conviction.  She referred to the missing bits and omissions on the application form
and said she would like to think that was just a mistake.  She said that although she was
conflicted she would like to give Mr Plumb the benefit of the doubt. 
Councillor McCabe said she could understand Councillor Brown being conflicted.  She
commented on what Mr Plumb had gone through today before the Committee and said
that it was as bad as being at Court.  She said that he’d had to sit here and that it had not
been a nice day for him for one offence.  She referred to having her own catering business
and advised that she did not know what days she should open and when she would be
busy and that she’d had to adjust as she went along. She said she would like to give Mr
Plumb the benefit of the doubt. 
Councillor Amanda Hampsey said she would like to see a continuation of this case so that
anything that was felt by the Committee to be missing could be put in place.  She said that
she would like to see Mr Plumb have a chance at this and if this meant a continuation to
get things in place it would give him a fair hearing. 
Councillor Daniel Hampsey also advised that he thought the Committee should go for a
continuation.  He said it was a positive thing to start a new business.  He referred to Mr
Plumb having only one conviction and said it would not be fair to him to have to wait years
and years before moving forward.  He said it would be nice to give him the benefit of the
doubt. 
Councillor Green referred to the Committee being satisfied in the past with applications
that had slight errors or omissions and that the Committee have gone on to grant or reject
applications.  He said he did not think there would be grounds for continuing.  He advised
that he personally thought the Committee should be making a decision today and that the
key thing was the conviction and whether or not Mr Plumb was a fit and proper person. 
Councillor Green referred to the various views around the table and suggested that a vote
should be taken as to whether or not a continuation should be agreed or if the Committee
should proceed to make a decision today.  Councillor Amanda Hampsey advised that she
Page 19

Page 20

would like to retract her earlier comment to have a continuation and advised that she
would second a Motion from Councillor Green to come to a decision today. 
Motion 
To agree make a decision on the application today. 
Moved by Councillor Kieron Green, seconded by Councillor Amanda Hampsey. 
Amendment 
To agree to continue consideration of this application to allow for additional information to
be provided to the Committee. 
Moved by Councillor John Armour, seconded by Councillor Andrew Kain. 
A vote was taken by calling the role. 
Motion   Amendment 
Councillor Brown  Councillor Armour
Councillor Green  Councillor Hume
Councillor A Hampsey Councillor Kain
Councillor D Hampsey
Councillor Hardie
Councillor Howard
Councillor Irvine
Councillor Kennedy
Councillor McCabe
Councillor Wallace 
The Motion was carried by 10 votes to 3 and the Committee resolved accordingly. 
Motion 
On the basis of the Police objection and the seriousness of the offence, to refuse the
application on the grounds that the Applicant was not a fit and proper person to hold a
licence. 
Moved by Councillor Graham Hardie, seconded by Councillor Paul Donald Kennedy. 
Amendment 
To agree to grant a Street Trader Licence to Mr Grayham Plumb. 
Moved by Councillor Liz McCabe, seconded by Councillor Fiona Howard. 
A vote was taken by calling the roll. 
Motion   Amendment 
Councillor Armour  Councillor Brown
Councillor Hardie  Councillor Green
Page 20

Page 21

Councillor Hume  Councillor A Hampsey
Councillor Kain  Councillor D Hampsey
Councillor Kennedy  Councillor Howard    
Councillor Irvine    
Councillor McCabe    
Councillor Wallace 
The Amendment was carried by 8 votes to 5 and the Committee resolved accordingly. 
DECISION 
The Committee agreed to grant a Street Trader Licence to Mr Grayham Plumb and noted
that he would receive written confirmation of this within 7 days. 
(Reference: Report by Head of Legal and Regulatory Support, submitted) 
Page 21

Page 22

This page is intentionally left blank

Page 23

Argyll and Bute Council
Development & Economic Growth   
Committee Planning Application Report and Report of Handling as required by
Schedule 2 of the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013 relative to applications for Planning Permission or
Planning Permission in Principle 
Reference No: 21/00349/PPP
Planning Hierarchy: Local
Applicant: Rosneath Farms Ltd
Proposal: Site for the erection of dwellinghouse
Site Address:  Plot 7, Land To The Rear Of Lochewe and Ardlanish, Kilcreggan,
Helensburgh Argyll And Bute    
DECISION ROUTE 
Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
 Site for the erection of a dwellinghouse
 Formation of access
 Installation of private foul drainage scheme comprising septic tank with
outfall to soakaway 
(ii) Other specified operations
 Connection to public water supply network 
(B) RECOMMENDATION: 
Planning permission in principle be approved subject to conditions 
(C) CONSULTATIONS:   
Area Roads – 30.04.2021 - No objections subject to conditions.
It is noted that the existing private access does not have capacity for further
development without essential improvement and road widening works being carried
out.
Parking to be provided in accordance with adopted standards referred to in SG LDP
TRAN 6.
Surface water must not be discharged from the site onto the carriageway. 
Scottish Water – 13.04.2021 - No objections.
This does not confirm that the proposed development can currently be serviced.
Further investigations into Water capacity may be required upon submission of a
formal application by the applicant to Scottish Water.
Page 23 Agenda Item 4

Page 24

Records do not show any public Waste Water infrastructure within vicinity of site -
advise applicant to explore private treatment options.
Surface water connection in to Scottish water combined sewer system will be
accepted only in limited exceptional circumstances on brownfield sites. 
WoSAS – 07.05.2021 –
Recommended that any planning permission be subject to a safeguarding conditions
requiring an archaeological watching brief to be carried out during ground
disturbance works. 
(D) HISTORY:   
No relevant planning history on this application site. 
(E) PUBLICITY:   
Regulation 20 Advert Local Application – Expired 13.05.2021 
Neighbour Consultation - Expired 13.05.2021 
(F) REPRESENTATIONS:   
(i) Representations received from: 
Sabine Colgan - No Address Provided
Sheena Edwards - Portkil House, Kilcreggan, Helensburgh
John Lindsay - Portkil Lodge, Kilcreggan, Helensburgh
S.A. Mieszkowski - Raith Cottage, Kilcreggan, Helensburgh
C.I. Martin - Raith Cottage, Kilcreggan, Helensburgh
Martin Hodgson - No Address Provided
Roger Mitchell – Greensleeves, Kilcreggan, Helensburgh
Jean Mitchell – Greensleeves, Kilcreggan, Helensburgh
Alex Stewart – No Address Provided
Sue Stewart – No Address Provided
Sue Carpenter – Newport, Kilcreggan, Helensburgh
Calum MacLeod – Newport, Kilcreggan, Helensburgh 
(ii) Summary of issues raised: 
A total of 12 representations have been received. 
Ten of these object to the proposed development and two are neutral in tone however
they raise planning issues that require to be addressed. 
All representations and objections are available for inspection on the planning file via
the Council’s web-site, however the issues raised by objectors and other contributors
are summarised below: 
General Principle of Development in Relation Spatial Strategy
 This proposed house is the latest in a series of several separate
applications for residential development that would be the 17th new house
Page 24

Page 25

in the hamlet of Portkil by the applicant over recent years. This process
avoids the applicant’s requirement to provide an element of social
housing, referred to as “development creep.” This is an inappropriate
scale of new development relative to the size of the original hamlet. 
 Cumulative development of this hamlet has increased traffic movements
to the detriment of the quality of the natural environment and residential
amenities contrary to LDP policy.
Comment: - The proposed development has to be assessed with regard
to its individual merits however issues such as the capacity of the existing
private road will be taken into consideration. 
 Approval of this application will open up even further development.
Comment: - The current application falls to be assessed with regard to
its individual merits. Anticipation of further development is not a material
consideration. Any new applications for further development at this
hamlet will be assessed on their own merits having regard to all relevant
material planning considerations. This will include the Portkil (Village and
Minor Settlement) Development Management Zone as designated in the
approved Local Development Pattern. 
Impact on Historic Environment
 Adverse impact on the setting of nearby listed buildings with reference to
their social history interest.
Comment: - This is a material consideration and is assessed in detail in
Section (P) below with reference to LDP policy and guidance by HES.) 
 The site is in an area of historical interest with evidence of stone coffins
and pre-historic tools having been discovered.
Comment: - This is acknowledged. However as the degree of
archaeological significance of the site is uncertain, National and local
policy guidance advises that development may be approved in principle
subject to an archaeological safeguarding condition (refet to consultation
response from WoSAS and the assessment at Section (P)). 
Impact on the Natural Environment
 Adverse impact of proposed development on existing natural features
and conditions that provides wildlife habitat potential. Ongoing noise from
residential use of the site will have an adverse impact upon birds and
other wildlife habitat.
 Proposed development should be assessed with regard to the European
Birds and Habitats Directive.
Comment: - Refer to assessment at Section( P) below.. 
Detriment to Residential Amenities
 Loss of privacy to occupiers of adjacent houses due to close proximity.
Comment: - Notwithstanding that detailed design is not shown at this
stage it is considered that the site is large enough to accommodate a
dwellinghouse without detriment to the residential amenities of existing
residents by reason of direct overlooking windows to habitable rooms in
accordance with supplementary guidance. 
Page 25

Page 26

 Detriment to local residential amenity by reason noise and vibration
disturbance; dust and debris: fumes: etc of prolonged and constant
construction activity.
Comment: - Whilst this these issues are not dismissed as causing
nuisance to residents they are not a material consideration in relation to
the current application. Any planning permission will be subject to
planning conditions to safeguard residential amenities during the
construction phase and any breach will be investigated and acted upon. 
 Increased light pollution.
Comment: - The application site is bounded by four existing residential
properties. Whilst it bounds onto open countryside to the north east and
south east, a new house would relate to existing houses adjacent to it
and the increase in light resulting from one house on the edge of a hamlet
of houses will not have a material impact on either residential amenities
or the natural environment/landscape character. 
Vehicular Access
 Private access road does not have capacity to serve existing
development with congestion caused by an intensification of traffic
movements and inability of vehicles to pass.
 Capacity issues relating to the private road and the intensification of
traffic movements has resulted in vehicle related damage to property and
road safety issues. This will be exacerbated by additional development.
Comment: - Refer to assessment at Section (P). 
 There are large holes in the roads. Road maintenance is not the legal
responsibility of local residents.
Comment: - It is not clear whether this refers to the wider public road
network or the private road (Portkil Road) linking the development at
Portkil to the B833 public road. Reference to maintenance responsibilities
under the terms of title deeds strongly indicates the former. Maintenance
of the private access road is a private legal matter and as such, the
condition of the private access road surface is not a material land-use
planning consideration that can be afforded material weight by the
planning authority in assessing this planning application. 
 Private access to Plot 7 (current application site is too narrow for
construction vehicles. This will result in obstruction of access to existing
houses by reason of construction vehicles unloading/parking on shared
section of private road.
Comment: - It is the responsibility of the developer to provide safe and
appropriate access to the site for construction plant and materials within
any constraints. 
 Access is not wide enough to accommodate fire tender vehicles
Comment: - This is a Building Warrant consideration. 
Drainage and Flooding
Existing residents have been threatened by flooding due to surface water
run-off from the private road, made worse by inadequate,
damaged/blocked field drains and ditches.
Comment: - Refer to the assessment at Section (P) 
Page 26

Page 27

Infrastructure Services
 Services infrastructure, including surface water drainage and public
water supply in this area does not have capacity to serve any more
development.
Comment: - Refer to the assessment at Section (P) 
Proposed development will further reduce water pressure in the local
area.
Comment: - The consultation response from Scottish water does not
identify any constraints with regard to public water supply, however
Scottish Water may investigate capacity, or any other existing issues with
regard to service, upon receipt of an application form the developer.
Existing residents experiencing water pressure issues should contact
Scottish water in the first instance. 
 Concern that there is inadequate provision of fire hydrants to serve the
existing number of properties.
Comment: - Fire hydrants and access for fire tenders is a matter related
to an application for a Building warrant (as opposed to an application for
planning permission.) The adequacy of the number and location of fire
hydrants will be assessed as part of any subsequent application to the
Council for a Building Warrant. Residents with concerns over existing
provisions for fire-fighting are advised to contact the Fire service in the
first instance. 
Miscellaneous 
 Previous housing development has been built on good quality agricultural
land and not to an appropriate scale, design and siting relative to the
countryside contrary to LDP policy and local objections.
Comment: - The contributor accepts that the current application site is
not good quality land. Notwithstanding repeated objections regarding
previously approved housing development, this current application falls
to be determined on its individual merits having regard to all material
considerations including LDP policy and material planning considerations
raised by contributors. 
 Alleged indifference of landowner to maintaining the quality of the area
with specific alleged actions or lack of actions.
 Alleged destruction of one third of woodland on the application site by the
landowner during the bird nesting season in 2020, demonstrating
disregard for the natural environment. 
Comment: - Not a material planning considerations in relation the current
planning application. The habitats regulations are legislatively separate
to Town and country Planning legislation and the Council is not the
appropriate authority in respect of alleged breaches. Allegations of
offences under the provisions of the Wildlife and Countryside Act
1981/Conservation (Natural Habitats, &c.) Regulations 1994 should be
reported to NatureScot or Police Scotland.
Concerns regarding landfilling with contaminated material should be
reported to the Council’s Environmental Health Services.  
 The planning authority developer has failed to manage breaches of
planning conditions by the developer(s) in respect of previous
Page 27

Page 28

developments. Approval of the current application will exacerbate these
issues.
Comment: - Officers cannot comment in detail on allegations of lack of
responses to breaches of specific planning conditions relative to
previously approved development within this area. Local residents are
advised to contact Planning Services to report any ongoing breaches of
conditions separate to this current process application and Officers will
investigate these concerns and respond if required. Should the current
application be approved subject to planning conditions then Officers will
seek to ensure that the development is implemented with due regard to
those conditions.   
 There’s no identified need for additional housing in this location.
Comment: - The application does not seek to justify the proposed
development with regard to any exceptional circumstances including an
identified need for housing. This application is for small-scale residential
development on a site within a designated minor settlement, consistent
in principle with the LDP Settlement and Spatial Strategy. A lack of
identified need is not material to this proposal and does not in itself
warrant refusal of planning permission. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Statement: No  
(ii) An appropriate assessment under the
Conservation (Natural Habitats) Regulations
1994:   
No  
(iii) A design or design/access statement:    No  
(iv) A report on the impact of the proposed
development eg. Retail impact, transport
impact, noise impact, flood risk, drainage
impact etc: 
Percolation Test Results Report – 19th March
2021
 Report refers to percolation tests in relation
to 3 no. trial holes. (It’s noted that location of
trial holes not supplied.)
 The above informed a “percolation value”.
 Septic tank soakaway calculations
 Proposed subsurface drainage system for
proposed soakaway recommended as 5m x
20m trench with 150mm dia. perforated
drainage pipes as indicated on site plan.
NOTE: - Contrary to the above, neither the
plan attached to the Percolation Test Report
or any other plan submitted as par of the
Yes
Page 28

Page 29

application shows the proposed location for a
soakaway. 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   No   
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  No    
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
‘Argyll and Bute Local Development Plan’ Adopted March 2015 
LDP STRAT 1 – Sustainable Development 
LDP DM 1 – Development within the Development Management Zones 
LDP 3 – Supporting the Protection Conservation and Enhancement of our
Environment 
LDP 8 – Supporting the Strength of our Communities 
LDP 9 – Development Setting, Layout and Design 
LDP 10 – Maximising our Resources and Reducing our Consumption 
LDP 11 – Improving our Connectivity and Infrastructure 
‘Supplementary Guidance to the Argyll and Bute Local Plan 2015’ (Adopted
March 2016) 
Natural Environment 
SG LDP ENV 1 – Impact on Habitats, Species and our Biodiversity
SG LDP ENV 6 – Impact on Trees / Woodland 
Landscape and Design 
SG LDP ENV 14 – Landscape 
Historic Environment and Archaeology 
SG LDP ENV 16(a) – Impact on Listed Buildings
SG LDP ENV 20 – Impact on Sites of Archaeological Importance 
General Housing Development 
SG LDP HOU 1 – General Housing Development Including Affordable Housing
Provision 
Page 29

Page 30

Sustainable Siting and Design 
SG LDP Sustainable – Sustainable Siting and Design Principles 
Resources and Consumption 
SG LDP SERV 1 – Private Sewage Treatment Plants & Wastewater Systems
SG LDP SERV 2 – Incorporation of Natural Features / SuDS
SG LDP SERV 5(b) – Provision of Waste Storage & Collection Facilities within New
Development
SG LDP SERV 5(c) – Safeguarding Existing Waste Management Sites 
Transport (Including Core Paths) 
SG LDP TRAN 4 – New & Existing, Public Roads & Private Access Regimes
SG LDP TRAN 5 – Off-site Highway Improvements
SG LDP TRAN 6 – Vehicle Parking Provision 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
 NPF4 – Approved by Scottish Parliament 11th January 2023. 
 Historic Environment Policy for Scotland (HEPS) – 04.04.2019 – Historic
Environment Scotland (HES). 
 Managing Change in the Historic Environment: Setting – 03.02.2020 – HES 
 Argyll and Bute proposed Local Development Plan 2 (November 2019)
The unchallenged policies and proposals within pLDP2 may be afforded
significant material weighting in the determination of planning applications at
this time as the settled and unopposed view of the Council. Elements of the
pLDP2 which have been identified as being subject to unresolved objections
still require to be subject of Examination by a Scottish Government appointed
Reporter and cannot be afforded significant material weighting at this time. The
provisions of pLDP2 that may be afforded significant weighting in the
determination of this application are listed below: 
o Policy 35 – Design of New and Existing, Public Roads and Private
Access Regimes
o Policy 36 – New Private Accesses
o Policy 37 – Development Utilising an Existing Private Access or
Existing Private Road
o Policy 39 – Construction Standards for Private Access 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  No    
Page 30

Page 31

(L) Has the application been the subject of statutory pre-application consultation
(PAC):  No 
(M) Has a sustainability check list been submitted:  No 
(N) Does the Council have an interest in the site:  No 
(O) Requirement for a hearing: No 
A total of 12 representations have been received in objection to the proposed
development (10 objections and 2 representations of a neutral nature.) 
The approved Hearing protocol advocates a lesser emphasis on the previous
numbers (of representations) threshold as a ‘trigger’ for a Hearing and more reliance
on a criteria based approach in order to ‘add value’ to the determination process. 
 The material considerations in relation to the proposal are not considered
to be significantly complex. 
 The proposed development is considered to be consistent with
fundamental and up-to-date Local Development Plan policies and
supplementary guidance. As such, the recommendation does not seek to
justify a departure to the provisions of the Local Development Plan. 
Therefore, having regard to the criteria–based assessments set out in current
protocol, it is considered that a Pre-Determination Hearing will not add value
to the decision-making process, and is not required.    
(P) Assessment and summary of determining issues and material considerations 
The proposed site is situated within the minor settlement boundary for Portkil as
designated in the Argyll and Bute local development Plan 2015. As such, the
proposal is consistent with the Settlement and Spatial Strategy and should be
supported unless it would result in adverse environmental, transport of serve impact. 
The proposed development, by reason of location, siting, scale, density and massing
will integrate successfully with the existing pattern of built development in
accordance with the provisions of policies LDP 9 and Sg – Sustainable Siting and
Design Principles. 
Subject to safeguarding conditions, it is considered that the site can accommodate a
single dwellinghouse without adverse impact upon the natural or historic
environment. 
Subject to commensurate improvements to the existing private access road it is
considered that the proposal can be served by an appropriate private and public road
regime. The applicant has confirmed that he owns the land to either side of the
private road along its length, and such the required improvement works can be
secured by a suspensive planning condition. 
Page 31

Page 32

It is considered that private drainage infrastructure can be provided to serve the
proposed development without risk of flooding. Full details of the private drainage
system can be secured by means of planning condition. 
It is therefore recommended that planning permission in principle should be
approved subject to the planning conditions recommended below. 
(Q) Is the proposal consistent with the Development Plan: Yes 
(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Granted: 
Subject to appropriate safeguarding conditions to secure the appropriate siting and
design of a modest dwellinghouse within the site, the site is considered to represent
an appropriate opportunity for development within the defined ROA consistent the
relevant provisions of the Development Plan, and there are no other material
considerations of sufficient significance to indicate that it would be appropriate to
withhold planning permission having regard to Section 25 of the Act. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
N/a 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
No 
Author of Report: Norman Shewan Date: 02.02.2023 
Reviewing Officer: Sandra Davies Date: 06.02.2023 
Fergus Murray
Head of Development & Economic Growth 
Page 32

Page 33

CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 21/00349/PPP 
1. PPP - Standard Condition & Notes 1 
Plans and particulars of the matters specified in conditions 3, 4, 5, 6, 7 and 8 below
shall be submitted by way of application(s) for Approval of Matters Specified in
Conditions in accordance with the timescales and other limitations in Section 59 of the
Town and Country Planning (Scotland) Act 1997 as amended. Thereafter the
development shall be completed wholly in accordance with the approved details. 
Reason: In accordance with Section 59 of the Town and Country Planning (Scotland)
Act 1997 (as amended).PP - Approved Details & Standard Notes – Non EIA
Development  
2. PPP - Approved Details & Standard Notes 2 
The development shall be implemented in accordance with the details specified on the
application form dated 17th February 2021, supporting information and, the approved
drawings listed in the table below unless the prior written approval of the planning
authority is obtained for an amendment to the approved details under Section 64 of
the Town and Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan PL–657-00 - 18.02.21
Location Plan and
Existing &
Proposed Site Plan
PL–657-01 - 18.02.21 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
3. Design and Finishes 
Pursuant to Condition 1 – no development shall commence until plans and particulars
of the site layout, design and external finishes of the development have been
submitted to and approved by the Planning Authority. These details shall incorporate: 
(i) A statement addressing the Action Checklist for developing design contained
within the Argyll and Bute Sustainable Design Guide 2006;
(ii) Taking consideration of the Sustainable Siting and Design Principles set out in
the adopted ‘Argyll and Bute Local Development Plan’ 2015;
(iii) Single or single storey with accommodation in the roof space;
(iv) A house siting, scale and plan form that responds clearly to the natural
contours of the site in order that the proposed built development ‘hunkers
down’ into the prevailing landform and minimises intrusive cut and fill
excavation;
(v) Building scale, massing and form that reflects, or sympathetic to the existing
pattern of built development in the immediate vicinity;
(vi) Narrow span volumetric form with symmetrically pitched roof angled between
37 and 42 degrees finished in natural slate or good quality artificial slate, unless
an alternative roof form/design/materiality can be demonstrated as an
acceptable alternative solution to the satisfaction of the planning authority by
means of a comprehensive Design Statement;
Page 33

Page 34

(vii) External walls finished in wet dash render, smooth render, natural stone, timber
or a mixture of these finishes unless an alternative material cladding strategy
can be justified by means of a Design Statement to the satisfaction of the
planning authority;
(viii) Window openings with a vertical emphasis unless alternative opening
proportions can be justified as an integral part of a robust design process and
justified by means of a Design Statement to the satisfaction of the planning
authority. 
(ix) Existing and proposed sections through the site to demonstrate that the
dwellinghouse will be sited in a manner sympathetic to the wider landscape
impact of the area.
(x) Existing topographical survey and proposed site plan showing ground levels
and finished floor levels (FFLs) relative to an identified fixed datum point
located close to but outwith the application site. 
Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act
1997 as amended, and in order to integrate the proposed dwellinghouse with its
surrounds. 
4. Pursuant to Condition 1, no development shall commence until plans and details
showing the following works to the vehicular access, including the existing private
access road from the junction of the proposed new access to the proposed site for a
dwellinghouse to the junction with the B833 public road, and parking regime to serve
the proposed development are submitted to and approved in writing by the Local
Planning Authority: 
(i) Access at connection between the development site and the private access
track to be constructed in accordance with Council’s Roads Standard Detail
Drawing SD 08/004a.
(ii) Commensurate improvements to the existing private access road/track to
provide a continuous 5.5 metre adoptable carriageway width between the
junction of the Rosneath road (B833) and the private access to the proposed
dwellinghouse, including a 2 metre wide service strip/grass verge;
(iii) Parking provision commensurate with the size of dwellinghouse proposed in
accordance with SG LDP TRAN 6 and the Car Parking Standards of the
adopted ‘Argyll and Bute Local Development Plan’ 2015. 
Prior to commencement of any works on the application site: 
(i) The commensurate improvements to the private access road from the access
point to the proposed dwellinghouse to the junction with the Rosneath road
(B833), as specified above, shall be completed, and written confirmation that
the improvements have been implemented to an adoptable standard has been
issued by the planning authority in consultation with the Council’s Roads and
Infrastructure Services.
(ii) The approved scheme of works in respect of the junction layout at the
connection between the private site access and the private track shall be
formed to at least type 1 base course standard and the visibility splays shall be
cleared of all obstructions such that nothing shall disrupt visibility from a point
1.05 metres above the junction at point X to a point 0.6 metres above the public
road carriageway at point Y. The final wearing surface on the improved private
access and passing place shall be completed prior to the development first
being occupied and the visibility splays shall be maintained clear of all
obstructions thereafter. 
Page 34

Page 35

The approved parking and turning layout shall be implemented in full prior to the
development first being occupied and shall thereafter be maintained clear of
obstruction for the parking and manoeuvring of vehicles. 
Reason: To ensure that the proposed development can be served by an appropriate
private/public road regime and in the interests of road safety in accordance with the
provisions of the Argyll and Bute local Development Plan – 2015 and policies 35, 36,
37 and 39 of the emerging Proposed Argyll and Bute Local Development Plan 2.  
5. No development or other work shall be carried out on the site until a pre-
commencement survey for the presence of protected species has been carried out by
an appropriately qualified person and has been submitted for the written approval of
the Planning Authority in consultation with NatureScot. In circumstances where
species of interest are identified as being present, or at risk from construction works,
the survey shall further provide suggested avoidance and or mitigation measures,
including timing constraints, to address such presence or risk. The development shall
be implemented in accordance with the measures identified in the duly approved
scheme. 
Reason: In order to establish that the circumstances of the site have not changed
significantly between approval and implementation of the development for the purpose
of protecting natural heritage assets in the interest of nature conservation. 
6. PPP – Archaeological Watching Brief 
Pursuant to Condition 1 - no development or ground breaking works shall commence
until a method statement for an archaeological watching brief has been submitted to
and approved by the Planning Authority in consultation with the West of Scotland
Archaeology Service. 
The method statement shall be prepared by a suitably qualified person and shall
provide for the recording, recovery and reporting of items of interest or finds within the
application site. 
Thereafter the development shall be implemented in accordance with the duly
approved details with the suitably qualified person being afforded access at all
reasonable times during ground disturbance works. 
Reason: In order to protect archaeological resources. 
7. PPP – Full Landscaping Scheme 
Pursuant to Condition 1 – no development shall commence until a scheme of boundary
treatment, surface treatment and landscaping has been submitted to and approved by
the Planning Authority. The scheme shall comprise a planting plan and schedule which
shall include details of: 
(i) Existing and proposed ground levels in relation to an identified fixed datum;
(ii) A tree survey including a site plan accurately showing the location and species of
existing trees within the site and identifying those to be retained and those to be
felled;
(iii) A proposed scheme for the planting of a substantial tree belt along the south
eastern edge of the application site boundary including an appropriate mix of
deciduous species, sizes and planting densities;
(iv) Location design and materials of proposed walls, fences and gates;
Page 35

Page 36

(v) Proposed soft and hard landscaping works including the location, species and size
of every tree/shrub to be planted;
(vi) A programme for the timing, method of implementation, completion and
subsequent on-going maintenance. 
If it is not possible to provide a suitably deep tree buffer zone within the planning
application site boundary then a tree belt shall be provided in the adjacent field
alongside the south eastern boundary of the application site. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme unless otherwise approved in writing by the Planning Authority. 
Any trees/shrubs which within a period of five years from the completion of the
approved landscaping scheme fail to become established, die, become seriously
diseased, or are removed or damaged shall be replaced in the following planting
season with equivalent numbers, sizes and species as those originally required to be
planted unless otherwise approved in writing by the Planning Authority. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity.  
8. PPP – Details of New Private Foul Drainage System 
Pursuant to Condition 1 – no development shall commence until details of the
proposed means of private foul drainage to serve the development have been
submitted to and approved by the Planning Authority. 
The duly approved scheme shall be implemented in full concurrently with the
development that it is intended to serve and shall be operational prior to the
occupation of the development. 
Reason: To ensure that an adequate means of foul drainage is available to serve the
development.   
9. Sustainable Drainage System 
Notwithstanding the provisions of Condition 2, the development shall incorporate a
surface water drainage system which is consistent with the principles of Sustainable
urban Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s SuDS
Manual C753 and Sewers for Scotland 4th Edition with post development runoff not
exceeding the greenfield runoff rate.  The requisite surface water drainage shall be
operational prior to the development being brought into use and shall be maintained
as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and
to prevent flooding. 
Page 36

Page 37

ADDITIONAL NOTES TO APPLICANT 
 Regard should be had to the West of Scotland Archaeology Service’s consultation
comments in respect of the proposed development. 
 Private drainage arrangements are also subject to separate regulation by Building
Standards and SEPA. 
 Further advice on SuDS can be found in SEPA’s Standing Advice for Small Scale
Development – www.sepa.org.uk. 
Page 37

Page 38

APPENDIX A – RELATIVE TO APPLICATION NUMBER: 21/00349/PPP 
PLANNING LAND USE AND POLICY ASSESSMENT 
A. Settlement Strategy 
The site is located within the Portkil Village/minor Settlement Development
management Zone designated in the Argyll and Bute Local development Plan 2015
(the LDP) wherein Policy LDP DM 1 (C) gives encouragement to sustainable and small
scale residential development on appropriate sites. 
As such the proposed development is consistent in principle with the LDP Settlement
and Spatial Strategy. 
The assessment of whether this site is otherwise appropriate is set out within other
sections report, with reference to all relevant material planning considerations including
site specific LDP policy; consultation responses and planning issues raised by
contributors. 
B. Location, Nature and Design of Proposed Development 
The application site is located within the hamlet of Portkil located to the north east of
the key settlement of Kilcreggan towards at the southern end of the Rosneath
Peninsula. The hamlet is served by an existing private access road with a junction onto
the public road network at the B833 some 460 metres to the north of the edge of Potkil. 
The application forms state that the site measure approximately 2100m2. The site is
irregularly shaped, but generally wedge-shaped with a ‘leg’ at its southern end to
provide access to a shared private access road. It is bounded to the south west by an
existing residential property known as “Portkil Lodge.” It is bounded to the west and
north by existing houses (from north to south – “Newport”, “Ardlanish” and “Lochewe”).
The north eastern and south eastern site boundaries are demarcated by existing field
boundary fences giving onto open fields. (The north eastern and south eastern site
boundaries coincide with the eastern boundary of the Portkil Minor Settlement as
designated in the LDP.) 
The site is characterised by thick undergrowth with some marshy ground conditions
within the western and northern areas where the ground level is comparatively low.
The eastern part of the site has dense undergrowth and an area of deciduous
woodland. Map records indicate that the woodland within the application site appears
to have been part of a larger area of woodland extending into open countryside south
east of the site. This area of woodland outside off the site boundary has been removed.
Levels are generally uneven and the levels generally fall over the length of the site
from north to south with a cross fall from east to west. Officers site visit revealed a
substantial amount of burrows within the eastern part of the site although it was not
possible to identify the species habitat. An open field drain/ditch has been dug along
the rear of the western site boundary with “Lochewe” discharging onto an unsurfaced
farm track that runs along the south western edge of the site and gives access from
the ‘main’ private road to the fields to the east between “Lochewe” and “Portkil Lodge.”
This strip of land (existing farm track) is within the application site in order to provide a
private access from the shared private road to serve the proposed house. 
Page 38

Page 39

The application proposal is to establish the principle of erection of a house on the
application site with vehicular access to the shared private access road and installation
of private drainage system comprising a new septic tank discharging to a soakaway.
No details of the private drainage system has been provided (apart from a very brief
description in the Percolation Test Report and such the detailed design will be
assessed by means of a subsequent application for approval of matters specified by
conditions (AMSC). The submitted site plan indicates a house to be sited within the
widest part of the site to the rear of “Lochewe” and “Ardlanish” however it is noted that
no design work has been carried out and that the layout, scale and massing shown is
purely indicative at this stage; and that siting/layout, scale, massing, form, design and
external materials will be agreed as reserved matters by an application for AMSC. This
is acceptable in procedural terms. 
Therefore this application for planning permission in principle will be assessed in terms
of the principle of the erection of a single dwellinghouse with vehicular access and any
other details wil be subject to planning conditions. 
C. Natural Environment 
Policy LDP 3 and SG LDP ENV 1 generally aim to give stronger protection, and where
appropriate seek enhancement, to habitats and species, even when they are not
associated with specifically designated nature conservation sites. 
NPF 4 places considerable emphasis upon the need for planning to respond to the
global biodiversity crisis and to secure positive effects for biodiversity and our natural
environment. National Planning Policies 3 and 4 serve to protect biodiversity and
natural assets, which in turn play a crucial role in carbon reduction. NPP 3 advises that
proposals for local development should include appropriate measures to conserve,
restore and enhance biodiversity, proportionate to the scale and nature of the
development. NPP 4 advises that, if there are reasonable evidence to suggest that a
protected species is present on site or may be affected by a proposed development
then steps must be taken to establish its presence and potential impacts must be fully
considered prior tpo the determination of the application. 
Where there is evidence of protected species on a site that would be affected by
proposed development then the applicant wil be required to submit a specialist survey
and if necessary a mitigation plan as part of a planning application. Development
proposals that are likely to have an adverse effect on protected species and habitat wil
only be permitted where it can be justified in accordance with the relevant protected
species legislation. 
The application site is not overlain by, or in proximity to any European, national or local
designations. However, it does have several conditions that would support natural
habitat. This is confirmed by evidence of numerous burrows identified during the
officer’s site inspection however there was no demonstrable evidence to the particular
habitat. The existing tree belt and hedgerow provides good conditions for nesting birds. 
Given the uncertainty of the significance of species habitat within the site, it is
recommended that permission be approved subject to a safeguarding condition to
require a pre-commencement survey and report by an appropriate professional to
confirm, or otherwise,  the presence of protected species. This report will also
recommend appropriate measures to mitigate against impact on habitat, and the
development shall be carried out in accordance with the approved mitigation strategy. 
Page 39

Page 40

D. Built Environment 
Policies LDP 9 and SG LDP – Sustainable Siting and Design Principles generally serve
to require a good standard of siting, layout design that integrates appropriately with the
existing built development pattern and character. SG – Sustainable requires that
design of new housing in settlements be assessed against general principles set out
in paragraphs 4.1 and 4.2 (SG – Sustainable). These principles relate to location,
layout, access, density, services and design. 
The minor settlement of Portkil is a small to medium cluster of built development within
open countryside. The overall pattern of development is a clustered form (as opposed
to being linear). The original settlement of Portkil comprised a group of historic
buildings including Portkil House, Portkil Cottage, Portkil Lodge and several smaller
cottages. This original group is still evident at the southern end of the settlement as
having a distinct character to modern housing development that has taken to the north
over recent years. The proposed house plot is ‘tucked into’ a corner to the rear of three
of these more modern houses and the part of the site to be developed by a house is 
separated from “Portkil Lodge” to the south west by a farm track. (The farm track is
within the current application site in order to provide access to the proposed house –
it will continue to serve as an access to fields to the east of the settlement.) Ground
levels rise to the north and north east of the site such that any development will ‘sit in
a landscape ‘bowl’ when viewed from the north. It is considered that that the application
site has a strong relationship with existing built development adjoining to the west and
north and would appear as a logical extension of the settlement rounding off built
development up to the edge of the defined settlement boundary. 
Although densities of recent new development vary across the northern part of Portkil,
the size of the site is generally comparable with several other existing properties and
as such it is not considered that development will be out of keeping with the existing
built development pattern in relation to density. 
It is considered that the proposed development, by reason of location and size in
relation to existing built development, would integrate in a satisfactory manner with the
local pattern of built development in accordance with the provisions of policy LDP 9
and SG LDP – Sustainable siting and Design Principles.   
E. Impact on the Historic Environment   
The application site is adjacent to the north of two category C listed buildings, “Portkil
Cottage” and “Portkil Lodge.” 
Policy LDP 3 and SG LDP ENV 16(a) serve to require that development affecting a
listed building or its setting shall preserve the building or its setting and any special
architectural or historic interest that it possesses. 
In order to inform this assessment, an abridged extract of the listing by Historic
Environment Scotland, is reproduced below for each building: - 
“Portkil Cottage: -
Circa 1840, L-plan cottage with slightly later wing addition to NE. Low single
storey, gabled cottage, former factor's house to Portkil House. Grey cement render
with ashlar margins and dressings; advanced bracketted eaves. NW
(ENTRANCE) ELEVATION: broad 3-bay gable to outer right, lean-to boarded
porch addition at centre; flanking windows. Gabled wing advanced to left. SE
Page 40

Page 41

(MAIN) ELEVATION: 3-bay symmetrical block with slightly recessed 2-bay wing
addition to outer right. Advanced gabled centre bay breaking eaves.
Earlier 19th century with early 20th century alterations. Low, single storey, broad
cottage; cement harled with ashlar margins, mullions and dressings; chamfered
reveals; stop-chamfered arrises and quoins. Advanced boarded eaves. 
Former Coach Master’s House and Coach House: -
SW (MAIN) ELEVATION: 3 bays symmetrically disposed; round-headed doorway
at centre; tall stack directly above; slightly advanced flanking bays with tripartite
windows. NW ELEVATION: former coach house elevation; original openings
infilled to accommodate 3 casement windows; broad coach door at centre with
flanking doors. Shallow pitched grey slate piended roof with lead flashings; tall
coped wallhead stack, chamfered arrises; single octagonal can.” 
“Managing Change in the historic Environment – Setting” advises that is important to:;
 Identify the historic assets that might be affected;
 Define the setting of each historic asset; and,
 Assess the impact of any new development on this. 
Officers have identified the assets in this instance as the above two listed buildings.
The two separately listed buildings are sited in very close proximity to each other and
both are set in spacious grounds with mature landscaping and clearly defined
boundaries demarcated by established natural screening, notably along the shared
(northern) boundary with the application site and the eastern and southern boundaries.
The original settlement pattern was such that these two listed buildings formed part a
cohesive group of buildings including Portkil House to the west, but otherwise set in
open countryside to the south, east and north. This open countryside setting is
considered to form part of the setting. However, only a short length of the north eastern
boundary of Portkil Lodge is close to existing development (“Lochewe”) and extension
of built development in this area will have a negligible impact upon the open
countryside setting of the listed building from the north. 
The two listed buildings are low, single-storey buildings and are sited at a significantly
lower level than the application site due to prevailing landform. As such, it is considered
that the setting of these buildings is protected by their large curtilages and strongly
defined natural boundaries. There is very limited intervisibility between these listed
buildings and the application site. The application site is not materially closer to the
listed buildings than the recently constructed houses adjoining to the west, “Lochewe”
and “Ardlanish” and in terms of spatial development pattern, the proposal could be
considered as a part of this group of recent housing development distinct from the
listed buildings and their curtilages. 
On this basis, Officers are satisfied that the proposed development will not have a
materially detrimental impact upon the historic or architectural character of nearby
listed buildings or the integrity of their settings, in accordance with the provisions of
Policy LDP 3 and SG LDP 16(a) as well as Historic Environment Policy for Scotland
(HEPS) and the Managing Change in the Historic Environment advice by HES. 
F. Impact on Woodland. 
LDP 3 and SG LDP ENV 6 seek to generally protect and where possible enhance the
natural environment in relation to trees/woodland and establish the principle that the
Council will resist development likely to have an adverse impact on trees by the
Page 41

Page 42

preservation of and where appropriate compensatory planting of new woodland and
trees. Development proposals will not be supported where they will result in
“fragmenting or severing woodland habitats, unless appropriate mitigation measures
are identified and implemented in line with the mitigation hierarchy.” 
NPF 4 places considerable emphasis upon the need for planning to respond to the
global biodiversity crisis and to secure positive effects for biodiversity and our natural
environment. SPP – Policy 6 offers support to development proposals that enhance,
expand and improve woodland and tree cover. 
The submitted site plan does not show existing trees with an indication of trees to be
retained or removed however an officers site inspection has revealed that there is a
small linear group of deciduous trees (and thick ground cover) extending along the
south eastern boundary of the site with open countryside beyond. Officers’ assessment
is that many of these existing trees will require to be felled in order to implement the
proposed development of the site. As well as providing a very important natural screen
to the edge of built development in this area, the existing tree group provides potential
for wildlife habitat. 
In the event that significant tree removal is unavoidable, it is considered that the
application can only be supported if new tree planting can be achieved by the applicant
as a compensatory mitigation. This approach is consistent with the provisions of SG
LDP ENV 6. Compensatory tree planting can be secured by means of a planning
condition. If an effective buffer tree planting zone is not achievable within the current
application site boundary as expected, then the recommended planning condition can
allow for planting of an appropriate number and species of deciduous trees to form a
‘tree belt’ within the field adjacent to the east-south-east site boundary. Although
outwith the current application site boundary it is noted that the adjacent field is within
the ownership/control of the applicant, and as such, there is no ownership obstacle to
compliance with such a condition. 
G. Landscape Character 
Whilst within settlement, the site is bounded to the east and north by open countryside
and as such the impact on landscape character has been assessed. 
NatureScot has assessed this wider landscape as “Rolling Farmland with Estates” type
characterised by (abridged) groups of fairly large, rectangular fields enclosed by linear
shelterbelts and blocks of mixed woodland: scattered large farmsteads in countryside:
urban development on coastal plains and broader valleys: etc. 
As previously set out, it is considered that the proposed development will relate
strongly to the existing built development pattern and will not result in an obtrusive and
discordant expansion into the wider landscape setting. The planting of a compensatory
linear tree belt adjacent to the ESE site boundary will significantly assist the
assimilation of new development on the edge of built development into the wider
landscape character. 
H. Archaeological Matters
LDP 3 and SG LDP ENV 20 establish a presumption in favour of retaining, protecting,
preserving and enhancing existing archaeological heritage. 
Page 42

Page 43

The Council’s archaeological consultant organisation WoSAS has advised that the
application site lies within an area of some archaeological sensitivity based on the
presence of recorded sites and finds from various periods in the surrounding
landscape. It is considered that the proposed ground disturbance associated with this
proposal is reasonably large in scale and stands a chance of unearthing unrecorded
buried remains which may survive below ground. As the degree of archaeological
significance is uncertain, WoSAS has recommended that any planning permission be
subject to a safeguarding conditions requiring an archaeological watching brief to be
carried out by an acceptable archaeological organisation during all ground disturbance
works. This approach is consistent with national guidance and LDP policy and
supplementary guidance.   
I. Road Network, Parking and Associated Transport Matters. 
Policy LDP 11 generally serves to ensure that all new development is served by
transport infrastructure and makes provision for car-parking in accordance with Council
standards. SG LDP TRAN 4 requires that further development served by an existing
private access or private road (as an alternative to a public road) will only be acceptable
where: 
(i) “the access is capable of commensurate improvements considered by the
Roads Authority to be appropriate to the scale and nature of the proposed
development and that takes into account current access issues (informed by an
assessment of usage); AND;
(ii) The applicant can secure ownership of the private road or access to allow for
commensurate improvements to be made to the satisfaction of thr Planing
Authority.” 
Policy 35 of the proposed LDP 2 (Design of New and Existing, Public Roads and Private
Access Regimes) seeks to establish similar principles to policy LDP 11 in the current
LDP.  Policy 36 of pLDP2 (New Private Accesses) advises that new private accesses
that form an individual private driveway serving a single user development will generally
be acceptable where it doesn’t generate unacceptable levels of traffic. Policy 37 of
pLDP2 (Development Utilising and existing Private Access or Existing private Road) is
similar to SG LDP TRAN 4 of the LDP - 2015 (above) in relation to the current
application in terms of securing commensurate improvements to the private road where
required. Policy 39 (pLDP2) seeks to establish Construction Standards for Private
Access.
The proposed development is served by a private access driveway from the proposed
plot to the nearby ‘main’ shared private road along the line of an existing farm track.
From there, access to the public road network is via a single-width private road from
Portkil to a junction with the B833 some 460 metres to the north of the settlement. 
The planning authority considers that the existing shared private access road does not
have capacity to accommodate additional traffic generated by any further development
within this hamlet. This assessment reflects concerns expressed by existing residents.
However, the development is considered to be acceptable in respect of access issues
provided that essential road improvement and widening works over the length of the
private road from the settlement boundary to the B833 junction are carried out by the
landowner/developer. This can be achieved by a suspensive planning condition.
Although the private road is outwith the application site edged red, the applicant has
confirmed that land on either side of the road along its full length is in the same
Page 43

Page 44

ownership as the applicant, and as such there is no potential ownership constraint that
would preclude the use of such a condition. 
This approach is consistent with the provisions of policy LDP 11 and SG LDP TRAN 4
of the approved LDP – 2015 and policies 35,36, 37 and 39 of the emerging pLDP2. 
Policy LDP 11 and SG LDP TRAN 6 generally require the provision of on-site car
parking and manoeuvring area in accordance with the Council’s car parking standards
set out in the SG i.e 2 no. parking spaces for a 3-bedroom house and 3 no. spaces for
a house with more than three bedrooms. Officers are satisfied that the site is large
enough to accommodate sufficient car parking and turning space in accordance with
policy; and the detailed layout of parking and turning can be dealt with as a matter
specified by condition attached to this current planning decision. 
J. Service Infrastructure - Drainage 
Water supply is proposed by means of connection to the public) Scottish water) public
supply network. Whilst concerns regarding intermittent water pressure issues by local
residents are acknowledged, Scottish Water has not raised any capacity issues with
regard to water supply infrastructure, and as such this issue does not warrant refusal
of the application. Scottish Water may assess water capacity upon receipt of an
application by the developer. 
SG LDP SERV 1 generally requires that new development connect to the public sewer
unless the applicant can demonstrate that “connection is not feasible, for technical or
economic reasons...” The Scottish Water consultation response confirms that there is
no public waste water infrastructure within the vicinity of the site and as such a private
treatment plant is an acceptable option in this instance. 
It is proposed that drainage for the house be served by a private treatment system
comprising installation of a septic tank with discharge to a soakaway. Percolation test
results have been submitted to demonstrate that a soakaway system is appropriate
and test results used to inform the detailed design and volume of the proposed
soakaway. 
On this basis, the planning authority is satisfied that adequate water supply and
drainage infrastructure can be provided to serve the propose development in
accordance with the provisions of policy LDP 10 and SG LDP SERV 1. 
Page 44

Page 45

Page 45

Page 46

This page is intentionally left blank

Page 47

Argyll and Bute Council 
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle 
_________________________________________________________________________ 
Reference No: 21/02709/PP 
Planning Hierarchy: Local Development 
Applicant: Mr Graham Wylie 
Proposal: Variation of condition numbers 3, 4, 5 and 6 and removal of conditions 7 and 8 
relative to planning permission 20/01150/PP (Erection of dwellinghouse). Access 
arrangements 
Site Address: Rhu Lodge, Ferry Road, Rhu, Helensburgh, Argyll and Bute, G84 8NF 
________________________________________________________________________  
SUPPLEMENTARY REPORT NO. 4 
1. INTRODUCTION   
The attention of Members is drawn to the main Report of Handling dated 8th November 2022
and to supplementary reports; No.1 dated 22nd November 2022, No. 2 dated 10th January
2023 and No. 3 dated 16th January 2023 that are currently before them for consideration in
respect of the above application. 
Committee members postponed the determination of the application pending the submission
of further drawings which where received on the 6th of February 2023. In light of the most
recent submission we have re-consulted the roads department. In order for the roads
department to respond to this submission we would seek to again postpone the determination
of this application to the next committee meeting in March. 
Further to this; subsequent to the last continuation please note that the determination of this
application will be made after NPF 4 has been adopted. Therefore, it is necessary to apply
policy NPF 4 to the next supplementary report. 
2. RECOMMENDATION 
Recommend that determination of the application be postponed to the March meeting
of PPSL.   
Author of Report: Emma Jane     Date: 8th February 2023 
Reviewing Officer: Peter Bain     Date: 8th February 2023 
Fergus Murray  
Head of Development and Economic Growth 
Page 47 Agenda Item 5

Page 48

This page is intentionally left blank

Page 49

Argyll and Bute Council 
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle 
_________________________________________________________________________ 
Reference No: 21/02709/PP 
Planning Hierarchy: Local Development 
Applicant: Mr Graham Wylie 
Proposal: Variation of condition numbers 3, 4, 5 and 6 and removal of conditions 7 and 8 
relative to planning permission 20/01150/PP (Erection of dwellinghouse). Access 
arrangements 
Site Address: Rhu Lodge, Ferry Road, Rhu, Helensburgh, Argyll and Bute, G84 8NF 
________________________________________________________________________  
SUPPLEMENTARY REPORT NO. 3 
1. INTRODUCTION   
The attention of Members is drawn to the main Report of Handling dated 8th November 2022
and to supplementary reports; No.1 dated 22nd November 2022 and No. 2 dated 10th January
2023 that are currently before them for consideration in respect of the above application. 
Committee members postponed the determination of the application pending a site visit, which
took place on the 12th of January 2023. This supplementary report has been provided with
regards to additional revised drawings received from the applicant on the 10th of January 2023. 
Below is a list of all revised drawings that have been provided and also provides a commentary
(in conjunction with the roads area manager) on these drawings. 
19 / 20 / R2 A - Proposed passing place improvements Rev A; This drawing illustrates the
location of the proposed passing place it does not illustrate or provide any further details. 
19 / 20 / R4 C - Proposed traffic calming improvements Rev C; This drawing indicates the
location of two proposed speed humps as well as noting that the new passing place is to be
5500mm wide (please see the comment below in regards to the revised driveway plan in
relation to this). In terms of the existing and proposed speed humps, these are noted, however,
the presence of such features does not permit us to determine the operational speed of the
road to less than 20mph.
19 / 20 / R5 C - Combined traffic calming measures Rev C; This drawing shows the existing
and proposed speed humps – while these are noted it does not alter the minimum accepted
speed limit of 20mph. This drawing also notes the new passing place is to be 5500mm wide.
Please see the comment below in regards to the revised driveway plan which flags up the
specific issues with this proposed passing place.  
Page 49

Page 50

19 / 20 / R7 C - Ferry Road proposed improvements Rev C; This drawing shows the extent
of the proposed improvement works and also notes the new passing place is to be 5500mm
wide - please see the comment below in regards to the revised driveway plan in relation to the
proposed passing place. This drawing also indicates the proposed grass verge as well as the
existing and proposed passing places – please see comment below in regards to the re-
alignment and passing place details required. 
19 / 20 / R9 C - Ferry Road extent of re-surfacing Rev C; This drawing shows the extent of
the proposed re-surfacing works, the proposed grass verge to sections and indicates the
proposed and existing passing places. As below if the applicant wishes to install a grass verge
then full details of the proposed re-alignment are required (this drawings does not adequately
show this as we require details showing the full extent of re-alignment, dimensions along the
full length, method of illumination for the re-alignment etc.). Furthermore, the existing and
proposed 100m intervisible passing places between the driveway access and the public road
are not adequately detailed. This drawing also fails to detail the second passing place that is
required between the driveway access and the main road – the passing place indicated at the
junction of the public road does not meet standard detail SD 08/003 A as it is a junction . All
passing places must be no more than 100m apart and intervisible for all road users. All passing
places must be constructed in accordance with the minimum requirements as set out in
standard detail SD 08/003 A. This drawing also notes the new passing place is to be 5500mm
wide - please see the comment below in regards to the revised driveway plan in relation to
this.
19 / 20 / R10 A - Driveway plan Rev A; This drawing shows the proposed driveway access
and proposed passing place at the driveway access – this drawing fails to detail the full extent
of the proposed road re-alignment required to install the grass verge along the boundary wall.
If the applicant wishes to install a grass verge then details of the full roads re-alignment must
be included. These details should include illumination of the carriageway (i.e. bollards).
Furthermore the visibility splay should be 2.4m back from the edge of the carriageway – this
drawing shows the splay set back 2m. Lastly, if the applicant wishes to install a grass verge
then the method of preventing water from flowing onto the carriageway should be within the
property boundary and not at the edge of the proposed verge as this drawing illustrates. 
22034_006 A - ECS drawing Rev A; This drawing shows the proposed access alterations
including visibility splays and alterations to the existing boundary wall. This drawing also
shows the two new speed humps and also indicates the 100m intervisible passing place
between the Rosslea access and the new passing place at the driveway access. Road widths
are also indicated on this drawing. The detail showing the 100m intervisible passing place is
incorrect as the suggested passing place at the access to the Rosslea is not in line with
standard detail SD 08/003 A – this suggested passing place is also not considered to be
invervisible for all road users as those exiting the Rosslea will not be able to see traffic from
the right. This drawing also indicates localised widening of 7m at the access to the adjacent
property however, this is not adequately detailed as no lengths of the widening are stipulated.
Lastly this drawing fails to demonstrate the requirement for 100m intervisible passing places
between the driveway access and the public road.
2. RECOMMENDATION   
Page 50

Page 51

The additional revised drawings submitted by the applicant have been considered and
commented on but do not alter the recommendation contained in the main Report of
Handling dated 8th November 2022; namely, that the application be granted subject to the
conditions, reasons and informative notes contained therein. 
Author of Report: Emma Jane     Date: 16th January 2023 
Reviewing Officer: Howard Young     Date: 16th January 2023 
Fergus Murray  
Head of Development and Economic Growth 
Page 51

Page 52

This page is intentionally left blank

Page 53

Argyll and Bute Council 
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle 
_________________________________________________________________________ 
Reference No: 21/02709/PP 
Planning Hierarchy: Local Development 
Applicant: Mr Graham Wylie 
Proposal: Variation of condition numbers 3, 4, 5 and 6 and removal of conditions 7 and 8 
relative to planning permission 20/01150/PP (Erection of dwellinghouse). Access 
arrangements 
Site Address: Rhu Lodge, Ferry Road, Rhu, Helensburgh, Argyll and Bute, G84 8NF 
________________________________________________________________________  
SUPPLEMENTARY REPORT NO. 2 
1. INTRODUCTION   
The attention of Members is drawn to the main Report of Handling dated 8th November 2022
and to supplementary report No.1 dated 22nd November 2022 that is currently before them for
consideration in respect of the above application. 
This supplementary report has been provided with regards to additional correspondence
received by the applicant on the 14th of December 2022 and also in response to the applicant’s
comments received on the 23rd of November in response to supplementary report No.1. 
Firstly, with regards to the additional correspondence received on the 14th of December for
which the main points 1 & 2 have been copied in (in bold) below;
1. The roads officer twice stated that the minimum width for fire engine access is 3.5
metres. This is misinformation. The required width for fire engine access widths at
“pinch points” is 2.75 metres. In the context of Ferry road as with many other private
accesses this can be critical and the PPSL members have been misguided here.
In respect of the above Stuart Watson the Assistant Network and Standards Manager has
noted; Designing Streets (extract below) makes allowance for a carriageway width to be
reduced to 2.75m over short distances, this is not intended to cover the full length of a road. 
The minimum width is stated as 3.7m and any reduction from this has to be agreed by the Fire
Safety Officer.  
“Emergency vehicles - The requirements for emergency vehicles are generally dictated by the
fire service requirements. All development proposals should be discussed with the relevant
Fire Authorities. 
Page 53

Page 54

The Association of Chief Fire Officers has expanded upon and clarified these requirements as
follows: 
• A 3.7 m carriageway (kerb to kerb) is required for operating space at the scene of a fire.
Simply to reach a fire, the access route could be reduced to 2.75 m over short distances,
provided the pump appliance can get to within 45 m of all points within a dwelling. 
• If an authority or developer wishes to reduce the running carriageway width to below 3.7 m,
they should consult the local Fire Safety Officer.”
In addition to the above, the National Roads Development guide, under section 3.1.9 (d) Fire
Fighting, states:
“Notwithstanding the recommended road widths in these guidelines, all roads should
accommodate access and operation of fire tenders. The width of roads and reinforced
emergency vehicle paths and their proximity to buildings is detailed in Part E of the Building
Standards (Scotland) Regulations. This document specifies a minimum width of 3.7 metres
adjacent to low rise dwellings to facilitate the use of pumping appliances (this width is
increased to 4.5 metres to permit the use of heavy rescue and firefighting equipment where
buildings are 9 metres or more in height). It should be noted that a basic vehicle path of
3.5 metres width (2.75 metres at pinch points) is appropriate for access but not operation
of the fire tender. ”
2. It was also stated at the meeting that discussions with the roads officer and the
applicant had reached a stage where there may be no point in further discussion. Again
misinformation. Apart from an initial discussion with the roads officer in July / August
2020 there have been no discussions or site meeting between the roads officer and the
applicant to date. I asked the roads officer in November 2020 for a meeting which was
declined. Over the last two years despite many attempts to engage with the roads
officer there has been no meaningful assistance from the officer.
In respect of the above Stuart Watson the Assistant Network and Standards Manager has
noted; Road Officers have not refused to meet - only that there was no merit in meeting before
an acceptable submission had been received. 
Secondly, with regards to the applicant’s comments received on the 23rd of November 2022
in respect of supplementary report No.1 the following is noted in conjunction with the roads
area manager; 
The applicant has noted in regards to road width; Details have been provided to confirm that
the full length of the private road between the A 814 and the development site would achieve
a 3.5 metre width. Also I have submitted confirmation that at the location where the existing
road width requires to be increased, the frontages have given their permission. 
In terms of the above comment from the applicant it is noted that drawings detailing new/
widened sections of carriageway ‘make-up’, in accordance with standard detail section
requirements available with SD 08/003 Rev A have not been provided within the drawing
package. Furthermore, where the existing carriageway is to be retained, no details have been
Page 54

Page 55

provided as to the method of ‘proving’ the existing formation is suitable for retention in
accordance with the aforementioned standard section detail.
The applicant also notes in regards to passing places; a site visit would confirm that the area
of the existing passing places exceeds the width and length of a standard passing place.
Although the geometry of these passing places differs from standard detail SD 08/003A they
provide the same ability to pass easily and safely and have done so for many years. This is
where consideration should be given to the fact that Ferry Road is within Rhu Conservation
Area and as such any improvements should be both proportionate and commensurate with
any current access issues and take into account the location of the site. Any required
improvements should therefore be the minimum necessary to satisfy any identified roads
issues. 
In terms of the above comment from the applicant it is confirmed that the geometry of passing
places has been considered within the geometry detailed within SD 08/003 Rev A. Therefore,
to ensure consistency throughout the area, passing place geometry shall be constructed in
accordance with SD 08/003 Rev A. Where this is not apparent within the drawing package
provided, the condition has been applied. Whilst consideration should be applied towards the
Conservation Area status, so to should it be applied to the road safety of all road users.
Furthermore, the applicant has noted the following in regards to the proposed passing place
at the driveway access and proposals to install a grass verge; I confirm that the proposal to
introduce a new grass verge has been proposed from the submission of the application which
was validated 16th February 2022. The supporting drawings were included. To date no
construction details have been requested, however, prior to any works starting on site this
detail would be submitted for approval. It should be noted that the angle the roads officer refers
to as being “too acute” is 50% less acute than the junction of Ferry road and the main A814.
The proposed passing place final design to be agreed prior to any works starting on site. 
In response to the above the roads officer has noted that until such time that drawings/ details
have been provided/ approved by Roads the condition previously set out shall apply.
Lastly the applicants have noted in regards to speed limits; As previously advised the existing
traffic calming measures (speed ramps) plus the proposal of an additional passing place and
further traffic calming measures ensures that the traffic speeds are below 20mph. It should
not be forgotten that very few vehicles travel along this route, however, these combined traffic
calming measures will maintain slow traffic speeds.
In regards to the above, from a position of road safety, the road has been measured against
the lowest regulatory speed of 20mph. With due consideration for the hierarchy of road users,
which places pedestrians over vehicles, in addition to there being no footway in this location,
the assessment speed of 20mph was considered correct from a position of road safety to all
road users.
2. RECOMMENDATION   
The additional comments from the applicant have been mentioned for completeness but do
not alter the recommendation contained in the main Report of Handling dated 8th November
Page 55

Page 56

2022; namely, that the application be granted subject to the conditions, reasons and
informative notes contained therein. 
Author of Report: Emma Jane     Date: 10th January 2023 
Reviewing Officer: Howard Young     Date: 10th January 2023 
Fergus Murray  
Head of Development and Economic Growth 
Page 56

Page 57

Argyll and Bute Council 
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle 
_________________________________________________________________________ 
Reference No: 21/02709/PP 
Planning Hierarchy: Local Development 
Applicant: Mr Graham Wylie 
Proposal: Variation of condition numbers 3, 4, 5 and 6 and removal of conditions 7 and 8 
relative to planning permission 20/01150/PP (Erection of dwellinghouse). Access 
arrangements 
Site Address: Rhu Lodge, Ferry Road, Rhu, Helensburgh, Argyll and Bute, G84 8NF 
________________________________________________________________________  
SUPPLEMENTARY REPORT NO. 1 
1. INTRODUCTION   
The attention of Members is drawn to the main Report of Handling dated 8th November
2022 that is currently before them for consideration in respect of the above application. 
This supplementary report has been provided with regards to proposed drawing reference
19/20/10 as an updated drawing (ref: 19/20/10 REV A) below, has been supplied by the
applicant. The roads officer has provided further comment on this drawing and has noted; 
Whilst the details as shown within this drawing noting the 4.5m wide driveway for the first 10m,
the radius and the kerb with water check are correct, it is noted that they have been shown in
the incorrect location as these should be measured back from the boundary wall and not from
a point beyond the boundary wall therefore, the details contained within this drawing are not
acceptable. 
Page 57

Page 58

Further to this, the applicant has provided further information within an email to Members
commenting on the detail within the published report of handling. Most of the matters noted
have been covered in detail within the report of handling and appendix A. However please
note the following additional comments;  
In Relation to note 1; The requirement to provide a 3.5 metre wide adopted road between
the A814 and the entrance dwelling (sic) is unnecessary, and most of Ferry Road is already
more than 3.5 metres wide and the submitted plans show that a 3.5 metre wide road can be
provided along the whole length of the road by simply surfacing a small gully approximately
60 metres long, on the north side of the road, immediately after the split. 
Officer comment; While is it noted that that proposed drawings contain a note that the
carriageway will be 3.5m wide we do not have specific details of this to show that the
proposals accord with the standard details. It is also noted that the road is within shared
ownership hence why condition 3(a) should remain to ensure this is implemented. 
In relation to note 2; With respect to the provision of passing places, there are two
intervisible passing places already in existence, within 100 metres of each other, and these
have operated safely for many years.  At the access to the approved new dwelling a third
passing place will be introduced.
Officer comment; Again while this has been noted on the proposed drawings, there has been
no details provided to show that the existing passing places accord with standard detail SD
08/003 A, hence why condition 3(b) should remain to ensure this is implemented as per the
standard detail. 
In relation to note 3; The Road’s Officer’s additional concern, the absence of a formal turning
head, cannot be introduced now.  The current application seeks only the variation (or
Page 58

Page 59

removal) of conditions that were attached to the previous grant of planning permission, and
this did not include any requirement in respect of the turning head, which in any event is
already used by the Council refuse lorry, and which has proved to be more than adequate
for many years.
Officers comment; In regards to the lack of formal turning head, this has been raised as a
concern that supported the need for roads improvements. There is no planning condition
being imposed that requires this. 
In terms of the proposed passing place at the driveway access and proposals to install a
grass verge, it is noted that the visibility splays as detailed within revised drawing 9/20/10
REV A show the splays taken from a point beyond the boundary / edge of existing
carriageway. There is no existing verge, if the applicant wishes to realign the road to install a
verge then we would need specific details on this, in terms of road construction.
Furthermore, this would no longer solely be assessed as a passing place but as a road
realignment and therefore, the details within this drawing are not acceptable as the angle is
too acute hence the requirement for a condition. 
Lastly in response to the comments in regards to speed limits, the roads officer has noted;
Ferry road is a private road and therefore has no enforceable speed limit, it is commonly
accepted that the default speed limit should be 30mph on private roads. As a local authority
we cannot imply a speed limit of less than 20mph therefore, in the absence of accurate
speed surveys we have deemed a 20mph visibility splay is acceptable, this is detailed as
part of the planning conditions. 
2. RECOMMENDATION   
This revised drawing and the additional comments from the applicant have been mentioned
for completeness but do not alter the recommendation contained in the main Report of
Handling dated 8th November 2022; namely, that the application be granted subject to the
conditions, reasons and informative notes contained therein. 
Author of Report: Emma Jane     Date: 22nd November 2022 
Reviewing Officer: Howard Young     Date: 22nd November 2022 
Fergus Murray  
Head of Development and Economic Growth 
Page 59

Page 60

This page is intentionally left blank

Page 61

Argyll and Bute Council
Development & Economic Growth   
Committee Planning Application Report and Report of Handling as required by
Schedule 2 of the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013 relative to applications for Planning Permission or
Planning Permission in Principle 
Reference No:  21/02709/PP
Planning Hierarchy: Local
Applicant: Mr Graham Wylie
Proposal: Variation of condition numbers 3, 4, 5 and 6 and removal of
conditions 7 and 8 relative to planning permission 20/01150/PP
(Erection of dwellinghouse). Access arrangements
Site Address:  Rhu Lodge, Ferry Road, Rhu, Helensburgh, Argyll And Bute, G84
8NF    
DECISION ROUTE 
Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
 Variation of condition numbers 3, 4, 5 and 6 and removal of conditions 7
and 8 relative to planning permission 20/01150/PP (Erection of
dwellinghouse). Access arrangements 
(ii) Other specified operations
 None 
(B) RECOMMENDATION: 
Planning permission be approved subject to conditions recommended herein. 
(C) CONSULTATIONS:   
Rhu and Shandon Community Council - 07.03.2022 – Object 
Rhu and Shandon Community Council have objected on the basis that the
proposed roads alterations will harm the character of the conservation area and
they would like to see the road remain as is. 
Roads Helensburgh And Lomond - 04.03.2022 – Object 
Roads Helensburgh and Lomond have objected to the proposals to vary/omit the
roads conditions relative to planning permission 20/01150/PP due to the current
issues with the existing access road, as follows; Existing carriageway width is less
than the acceptable carriageway width of 3.5m for emergency services vehicles, No
intervisible Passing Places & No formal turning head In accordance with: 
Page 61

Page 62

SG LDP TRAN 4. They further note that; Private Access shall be constructed to
incorporate minimum standards to function safely and effectively as set out in the
Council’s Road Development Guide, in particular in relation to adequate visibility
splays, access gradients, geometry, passing places, boundary definition, turning
capacities, integrated provision for waste management and recycling. Based on this
roads have noted that conditions 3, 5, 6, 7 & 8 relative to planning permission
20/01150/PP shall remain unchanged and condition 4 should be revised to suit the
roads consultation original response relative to planning application 20/01150/PP
being a minimum visibility splay of 2.4 x 25 x1.05 metres and not the 2.4 x 42 x1.05
metres as per the decision notice for 20/01150/PP. 
(D) HISTORY:   
02/00728/DET
Alterations to dwellinghouse
11.06.2002 
15/00085/PP
Erection of sunroom extension
02.04.2015 
16/00225/PP
Erection of dwellinghouse
23.03.2016 
17/00194/PP
Erection of detached garage
13.03.2017 
20/01150/PP
Erection of dwellinghouse
18.11.2020 
(E) PUBLICITY:   
Advert Type: Listed Building/Conservation Advert              Expiry Date: 24.03.2022 
(F) REPRESENTATIONS:   
i) Representations received from: 
Objection 
1. Brian Fleming Abergare House Rhu   10.03.2022
Page 62

Page 63

2. Ruth Chappell Fleming Abergare House Rhu   10.03.2022
3. Tim Lamb Rhu Cottage Ferry Road Rhu Helensburgh 10.03.2022
4. Jim Duncan Shoreacres Artarman Road Rhu Helensburgh Argyll And Bute
10.03.2022 
Support 
1. Colin Jackson Tanglewood Cumberland Road Rhu Helensburgh
02.03.2022
2. C A Cook Clanard Gareloch Road Rhu Helensburgh 02.03.2022
3. Jane Weir Victoria Cottage Hall Road Rhu Helensburgh 02.03.2022
4. Juliet Baines 1 Rhu Ellen Cottage Gareloch Road Rhu Helensburgh
02.03.2022
5. K Wallace 9 Guthrie Place Rhu Helensburgh Argyll And Bute 02.03.2022
6. Ann McKendrick Lagarie Torwoodhill Road Rhu  02.03.2022
7. Brian Murray 7 Church Road Rhu   02.03.2022
8. J Cairns 3 County Cottage Rhu   02.03.2022
9. R J Sawkins 66 East Clyde Street Helensburgh Argyll And Bute 
03.03.2022
10. Danielle Paterson Rocklea Garelochhead Helensburgh Argyll And Bute
22.02.2022
11. Michelle Cameron 17 Nelson Place Helensburgh Argyll And Bute G84 9ES
23.02.2022
12. Kathleen McGinley Ferry Coach House Ferry Road Rhu Helensburgh
24.02.2022
13. John MacBeath Tigh Na Mara Ferry Road Rhu Helensburgh 22.02.2022
14. Maureen Kinnear Rosslea West Ferry Road Rhu Helensburgh 28.02.2022
15. Lynn Nicolson Rhu Lodge Ferry Road Rhu Helensburgh 03.03.2022
16. John McMeeking Ramah Rhu Point  Ferry Road Rhu Argyll And Bute G84
8NF 21.02.2022
17. Roderic Taylor Garedale Manse Brae Rhu Helensburgh Argyll And Bute
23.02.2022
18. Emma Dodds 100 West Clyde Street Helensburgh Argyll And Bute G84
8BE 25.02.2022
19. Becky Morgan 100 West Clyde Street Helensburgh Argyll And Bute G84
8BE 25.02.2022
20. William Petrie Ground Floor Flat Craigard Church Road Rhu Helensburgh
Argyll And Bute 
21. Elizabeth Law 12 Cameron Drive Tullichewan Alexandria G83 0JT
28.02.2022
22. Paul Cairns 3 County Cottage Gareloch Road Rhu Helensburgh
03.03.2022
23. Jon Reid 10 Cumberland Terrace Rhu   03.03.2022
24. Peter Bogden 6 Rhu House Gareloch Road Rhu Helensburgh 03.03.2022
25. Fiona McNair 1 Glebefield Road Rhu Helensburgh Argyll And Bute
03.03.2022
26. Elizabeth Macdonald 4 Braehead Place Rhu Helensburgh Argyll And Bute
03.03.2022
27. Iain Coats 26 Redclyffe Gardens Helensburgh Argyll And Bute G84 9JJ
03.03.2022
28. Jo McKenzie 22 Baird Avenue Helensburgh Argyll And Bute G84 8DW
03.03.2022
29. Andrew Shearar 10 Havelock Street Helensburgh Argyll And Bute G84 7HB
03.03.2022
Page 63

Page 64

30. John Young 30 Stuckleckie Road Helensburgh Argyll And Bute G84 7NN
03.03.2022
31. Kathleen Young 30 Stuckleckie Road Helensburgh Argyll And Bute G84
7NN 03.03.2022
32. Roberta Kelly 10 Gallagher Way Renton Dumbarton  03.03.2022
33. Clive Burns 25 Malcolm Place Helensburgh Argyll And Bute G84 9HW
03.03.2022
34. R Boothby 5 Camperdown Helensburgh   03.03.2022
35. C Boothby 5 Camperdown Helensburgh   03.03.2022
36. Anne Marie Johnston 30 Templeton Way Helensburgh Argyll And Bute G84
8FA 03.03.2022
37. Ronald Grant 2/1 23 East Princes Street Helensburgh   03.03.2022
38. C Woolner 5 Princess Way Rosneath Helensburgh Argyll And Bute
03.03.2022
39. J Crossan 145 West King Street Helensburgh Argyll And Bute G84 8DJ
03.03.2022
40. J Cavana 31 Deanston Crescent Helensburgh   03.03.2022
41. L Nott 30 South King Street Helensburgh Argyll And Bute G84 7DX
03.03.2022
42. Margaret Harvey 37 Old Luss Road Helensburgh Argyll And Bute G84 7BN
03.03.2022
43. Tracy McGregor 1 Jeanie Deans Drive Helensburgh Argyll And Bute G84
7TG 03.03.2022
44. S Boothby 13 Kings Crescent Helensburgh Argyll And Bute G84 7RB
03.03.2022
45. Emma Campbell 1 Golf Place Helensburgh Argyll And Bute G84 9HQ
03.03.2022
46. B Cairns 36 Macleod Drive Helensburgh Argyll And Bute G84 9QU
03.03.2022
47. H Scott 77 West King Street Helensburgh Argyll And Bute G84 8EE
03.03.2022
48. William Johnston 30 Templeton Way Helensburgh Argyll And Bute G84
8FA 03.03.2022
49. Linda Conner 6 Hope Street Helensburgh Argyll And Bute G84 7EB
03.03.2022
50. Olly Ross 1 Upper Colquhoun Street Helensburgh Argyll And Bute G84
9AG 03.03.2022
51. Mick Howe Dilmun Ferry Road Rhu Helensburgh Argyll And Bute
07.03.2022
52. Kieran Robertson 18 Laggary Road Rhu Helensburgh Argyll And Bute
02.03.2022
53. Ella Lawson 2 Spys Lane Rhu Helensburgh Argyll And Bute 02.03.2022
54. S Forsyth Flat 1 8 Guthrie Place Rhu Helensburgh 02.03.2022
55. Agnes Murray 7 Church Place Rhu Helensburgh Argyll And Bute
02.03.2022
56. James Ritchie 14 Church Place Rhu Helensburgh Argyll And Bute
02.03.2022
57. A Cameron 9 Church Place Rhu Helensburgh Argyll And Bute 02.03.2022
58. Tim Brown 16 Church Place Rhu Helensburgh Argyll And Bute 02.03.2022
59. Mark Johnstone 1/2 Ardenlea Cumberland Road Rhu  02.03.2022
60. Zoe McEwan Dalarne Pier Road Rhu Helensburgh 02.03.2022
61. Charlene Hamilton Woodside Cottage Cumberland Road Rhu Helensburgh
02.03.2022
62. Patricia Drummond 16 Rhu Ellen Court Rhu Helensburgh Argyll And Bute
02.03.2022
Page 64

Page 65

63. Ross Balfour Whistlers Burn Rhu   02.03.2022
64. Bernard Howe Dilmun  Ferry Road Rhu Argyll And Bute G84 8NF
23.02.2022
65. Mrs Lynsey Petchey 3 Kidston Gardens Rhu Road Higher Helensburgh
Argyll And Bute 24.02.2022
66. Mary McGinley Ferry Coach House Ferry Road Rhu Helensburgh Argyll
And Bute 
67. Kerry Gould Tummel Cottage Cumberland Road Rhu Helensburgh
08.03.2022
68. O Johnston 12A Cairndhu Gardens Rhu   08.03.2022
69. Paul Rickards 4 Rhu House Gareloch Road Rhu Helensburgh 08.03.2022
70. Elspeth McNicol Lower Lochview Church Road Rhu  08.03.2022
71. Pauline Cochrane 9 Church Road Rhu   08.03.2022
72. Claire Harvey 14 Barge Court Rhu   08.03.2022
73. Ona McPhail 4 East Abercromby Street Helensburgh Argyll And Bute G84
7SP 08.03.2022
74. Paul King 4 East Abercromby Street Helensburgh Argyll And Bute G84 7SP
08.03.2022
75. Margaret Martin 17 Loch Drive Helensburgh Argyll And Bute G84 8PY
08.03.2022
76. Iain Martin 17 Loch Drive Helensburgh Argyll And Bute G84 8PY
08.03.2022
77. K C Gibson 14 old Luss road Balloch G83 8qp  05.03.2022
78. Graham Wylie Rhu Lodge Ferry Road Rhu Helensburgh Argyll And Bute
13.03.2022
79. David Macpherson 27C Queen Street Helensburgh Argyll And Bute G84
9QL 07.03.2022
80. Josephine Brown 21 Brae House Manse Brae Rhu Helensburgh
16.03.2022
81. H McNaught 11 Rhu Ellen Court Rhu Helensburgh Argyll And Bute
16.03.2022
82. D Miller Flat Ground/2 Sunnyside Hall Road Rhu 16.03.2022
83. Unknown Flat 3 22 Barge Court Manse Brae Rhu 16.03.2022
84. R Kilpatrick 14 Bonar Law Helensburgh   16.03.2022
85. David Fletcher 81 B West Princes Street Helensburgh   16.03.2022
86. Jenifer Cox 15 Walker Place Helensburgh   16.03.2022
87. Megan Mundie 25 Baird Avenue Helensburgh Argyll And Bute G84 8DW
16.03.2022
88. David Stewart 49B Dumbarton Road Bowling G60 5AQ  16.03.2022
89. Joan Kilpatrick 14 Bonar Law Avenue Helesnburgh   16.03.2022
90. Robert Morley Flat 1/2 18 West Clyde Street Helensburgh Argyll And Bute
16.03.2022
91. George Stewart Flat 1 Hillhead House Kirk Brae Shandon 16.03.2022
92. Fay Stewart Bochyle Kirk Brae Shandon G84 8NP 16.03.2022
93. J Cox 15 Walker Place Helensburgh   16.03.2022
94. A Cairns 36 Macleod Drive Helensburgh Argyll And Bute G84 9QU
16.03.2022
95. Graham Wylie Rhu Lodge Ferry Road Rhu Helensburgh Argyll And Bute
09.03.2022
96. Russell Leonard 39 Dennistoun Crescent Helensburgh Argyll And Bute G84
7JG 07.03.2022
97. Fiona Braddick 37 Johnson Court Helensburgh Argyll And Bute G84 7LJ
07.03.2022
98. J McMurdo Helensburgh G84 8DS   07.03.2022
99. Unknown 2/5 Hood Court Helensburgh   07.03.2022
Page 65

Page 66

100. Maire Sutherland 52 Maitland Court Helensburgh Argyll And Bute
G84 7EE 07.03.2022
101. D Hannah 10 Drumadoon Drive Helensburgh Argyll And Bute G84
9SF 07.03.2022
102. Alison Hannah 10 Drumadoon Drive Helensburgh Argyll And Bute
G84 9SF 07.03.2022
103. M Siniscalco 13 Maclachlan Road Helensburgh Argyll And Bute
G84 9BY 07.03.2022
104. Joan Bissett 13 Maclachlan Road Helensburgh Argyll And Bute G84
9BY 07.03.2022
105. Sybil Kennedy 35 Campbell Street Helensburgh Argyll And Bute
G84 8XZ 07.03.2022
106. Alistair Dickson 238 West Princes Street Helensburgh Argyll And
Bute G84 8HA 07.03.2022
107. S Mackenzie 1/1 4 Hanover Street Helensburgh  07.03.2022
108. Melanie Andrews 46 Abercromby Crescent Helensburgh Argyll And
Bute G84 9DX 07.03.2022 
ii) Summary of issues raised: 
Objection 
 Concern on the possible sub-division and use of previously approved
dwelling house on site as three short term lets 
Comment: this application solely relates to; the variation of condition
numbers 3, 4, 5 and 6 and removal of conditions 7 and 8 relative to
planning permission 20/01150/PP however, it is noted that the owner has
since removed the commercial listing for the above 
 Concern that the supposed commercial enterprise of the site of Rhu Lodge
could impact the surrounding area 
Comment: as comment above 
 Concern that Ferry Roads integrity as an ancient right of way and drove
road as an integral part of Scottish Gaelic life and culture could be
undermined 
Comment: the principle of development has been established under the
previous consent (ref: 20/01150/PP), this application solely relates to; the
variation of condition numbers 3, 4, 5 and 6 and removal of conditions 7
and 8 relative to planning permission 20/01150/PP 
 Concern that the character of Ferry Road could be affected by the
proposals 
Comment: as comment above 
Page 66

Page 67

 Concern that the proposals could affect the character of the surrounding
conservation area 
Comment: as comment above 
 Note that the proposed drawings are not in line with private discussions
between neighbours and the applicant 
Comment: This is not a material planning consideration 
 Concern that the boathouse as previously approved under application
reference 20/01150/PP could be used commercially 
Comment: This application solely relates to; the variation of condition
numbers 3, 4, 5 and 6 and removal of conditions 7 and 8 relative to
planning permission 20/01150/PP. The use of this property as a
commercial business does not form part of this application nor the previous.
If this were to be the case then a future planning application would be
required for the change of use 
 Note that it is undesirable and inappropriate for a development within the
boundary of Rhu Lodge to overflow beyond the site boundary by way of
changes to Ferry Road which could affect the character and layout of Ferry
Road and the surrounding conservation area 
Comment: the principle of development has been established under the
previous consent (ref: 20/01150/PP), this application solely relates to; the
variation of condition numbers 3, 4, 5 and 6 and removal of conditions 7
and 8 relative to planning permission 20/01150/PP 
 Concern about possible public misinformation resulting in the large number
of ‘pro-forma letters’ supporting this application which misinterpret the point
at issue 
Comment: This is not a material planning consideration 
 Note that the proposals include development on land not within the
applicant’s ownership 
Comment: Within the application form the applicant has noted that they are
the sole owner of all the land 
Support 
 Note that any increase in traffic caused by one additional 2 bed dwelling on
Ferry Road would be insignificant 
Comment: The above comments are noted 
Page 67

Page 68

 Note that a 3 bed dwelling was constructed on Ferry Road in 2018 with no
roads conditions requiring the introduction of a public road 
Comment: Each application is assessed on its own merits 
 Comment that the supposed negligible increase in traffic resulting from the
construction of a 2 bed dwelling does not require a publicly adopted road to
be installed 
Comment: the area roads manager was consulted on the previous consent
(ref: 20/01150/PP) and requires improvements to the existing private road
in the interest of road safety 
 Concern that the roads alterations could affect the character of Ferry Road
and the wider conservation area 
Comment: the principle of development has been established under the
previous consent (ref: 20/01150/PP), this application solely relates to; the
variation of condition numbers 3, 4, 5 and 6 and removal of conditions 7
and 8 relative to planning permission 20/01150/PP 
 Note that the introduction of a public road combined with the construction of
sea retaining walls, associated guard rails and rock armour would result in
the loss of a part of Rhu beach and mature trees 
Comment: the area roads manager was consulted on the previous consent
(ref: 20/01150/PP) and requires improvements to the existing private road
in the interest of road safety. The drawing submitted under this application
indicates the above interventions would be subject to a further planning
application if this were to be the proposed method of achieving the roads
conditions under consent (ref: 20/01150/PP) 
 Note that a public road is being proposed to replace the private road 
Comment: the area roads manager was consulted on the previous consent
(ref: 20/01150/PP) and requires improvements to the existing private road
in the interest of road safety 
 Concern that the introduction of a public road could cause more traffic and
obstructions than one additional dwelling 
Comment: as comment above 
 Comment that the change of Ferry Road from a private to public road would
be detrimental to users of the road 
Comment: as comment above 
 Note that the council currently struggle to maintain existing roads therefore,
why would they want to take on further road maintenance 
Page 68

Page 69

Comment: this is not a material planning consideration 
 Note that it is understood that 50m of stone boundary wall has to be
demolished and a number of mature trees removed to allow for the required
visibility splay. This would affect the appearance and character of the
conservation area 
Comment: the area roads manager was consulted on the previous consent
(ref: 20/01150/PP) and requires improvements to the existing private road
in the interest of road safety. The drawing submitted under this application
indicates the above interventions would be subject to a further planning
application if this were to be the proposed method of achieving the roads
conditions under consent (ref: 20/01150/PP) 
 Concern that the properties accessed off Ferry Road will not be able to
access their properties while improvement works are undertaken 
Comment: this is a civil matter between the parties concerned 
 Note that if the Rosslea Hotel can host large weddings while accessed off
Ferry Road then why can’t a 2 bed dwelling be built without the requirement
for the roads conditions 
Comment: Each application is assessed on its own merits 
 Concern that the provision of a public road could have a detrimental impact
on the area in terms of wildlife and beauty 
Comment: the area roads manager was consulted on the previous consent
(ref: 20/01150/PP) and requires improvements to the existing private road
in the interest of road safety 
 Note that the roads officer’s conditions as per application reference
20/01150/PP state that Ferry Road requires to be a publically adopted road
and furthermore, latterly the roads officer confirmed that the road will not be
adopted 
Comment: the roads conditions as per application reference 20/01150/PP
noted that the private road required improvements for it to be brought up to
an adoptable standard, this does not necessarily mean the road will be
adopted 
 Comment that the points raised in the community council’s consultation
response are not in relation to this application 
Comment: This application solely relates to; the variation of condition
numbers 3, 4, 5 and 6 and removal of conditions 7 and 8 relative to
planning permission 20/01150/PP. The comments raised by the community
council in relation to any supposed commercial use are subject to an
enforcement investigation 
(G) SUPPORTING INFORMATION
Page 69

Page 70

Has the application been the subject of: 
(i) Environmental Statement: No 
(ii) An appropriate assessment under the
Conservation (Natural Habitats) Regulations
1994:   
No 
(iii) A design or design/access statement:    No 
(iv) A report on the impact of the proposed
development eg. Retail impact, transport
impact, noise impact, flood risk, drainage
impact etc:   
In conclusion the request by the Council’s local
roads officer requiring the road to be
reconstructed to an adoptable standard would
have a major impact on Rhu Bay. In
accordance with the SCOTS National Road
Guide a 3.5 metre adopted road width is not
possible for the reasons given above and would
require to be 5.5 metres wide. 
This scale of works is not commensurate with
the level of development proposed and
therefore does not accord with the Council’s
planning policies or accord with Designing
Streets. 
Throughout the application process for the
dwelling house and this current application, we
have failed to see sight of the local Roads
Officer’s assessment of usage other than the
road serves more than 5 houses is a concern. 
We are also concerned at the inconsistent
approach taken by the local roads officer in
assessing other planning applications for single
dwellings served off a private road with more
than 10 houses. 
The commensurate improvements proposed for
Ferry Road have been devised following a
comprehensive assessment of usage and have
been designed to be sympathetic to the
Conservation Area. 
The proposed road improvements support road
safety and ensure any road concerns have
been satisfied giving continuous improvement
for the benefit of all road users and are of a
scale commensurate with the scale of
development.
Yes, a report by ECS
Transport Planning Ltd
has been provided. The
conclusion of this report
is included below; 
Page 70

Page 71

(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   No   
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  No 
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i) List of all Development Plan Policy considerations taken into account
in assessment of the application. 
‘Argyll and Bute Local Development Plan’ Adopted March 2015 
LDP STRAT 1 – Sustainable Development
LDP DM1 – Development within the Development Management Zones
LDP 3 – Supporting the Protection, Conservation and Enhancement of our
Environment
LDP 9 – Development Setting, Layout and Design
LDP 11 – Improving our Connectivity and Infrastructure 
‘Supplementary Guidance to the Argyll and Bute Local Plan 2015’ (Adopted
March 2016) 
SG LDP ENV 17 –Development in Conservation Areas and Special Built
Environment Areas
SG LDP HOU 1 – General Housing Development including Affordable Housing
SG LDP Sustainable - Sustainable Siting and Design Principles
SG LDP SERV 1 – Private Sewerage Treatment Plants and Wastewater (i.e.
drainage) systems
SG LDP SERV 2 – Incorporation of Natural Features / Sustainable Systems
(SUDS)
SG LDP TRAN 4 – New and Existing, Public Roads and Private Access Regimes
SG LDP TRAN 6 –Vehicle Parking Provision 
(ii) List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
 Argyll and Bute Sustainable Design Guidance, 2006 
 Scottish Planning Policy (SPP), 2014
 National Roads Development Guide
 Consultation Responses
 Third party representations 
Page 71

Page 72

Argyll and Bute proposed Local Development Plan 2 (November 2019) – The
unchallenged policies and proposals within pLDP2 may be afforded significant material
weighting in the determination of planning applications at this time as the settled and
unopposed view of the Council. Elements of the pLDP2 which have been identified as
being subject to unresolved objections still require to be subject of Examination by a
Scottish Government appointed Reporter and cannot be afforded significant material
weighting at this time. The provisions of pLDP2 that may be afforded significant weighting
in the determination of this application are listed below: 
 Policy 35 – Design of New and Existing, Public Roads and Private
Access Regimes
 Policy 36 – New Private Accesses
 Policy 37 – Development Utilising an Existing Private Access or Existing
Private Road
 Policy 38 – Construction Standards for Public Roads
 Policy 39 – Construction Standards for Private Access
 Policy 41 – Off Site Highway Improvements
  
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  No 
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  No 
(M) Has a sustainability check list been submitted:  No 
(N) Does the Council have an interest in the site:  No 
(O) Requirement for a hearing: No. This is a local application. It is considered that the
proposed development is in accordance with the relevant provisions of the Argyll
and Bute Local Development Plan and that the material land-use planning issues
arising are not unduly complex. As such it is not considered that a Hearing will add
value to the determination process.    
(P) Assessment and summary of determining issues and material considerations: 
Permission is sought for the following; Variation of condition numbers 3, 4, 5 and 6
and removal of conditions 7 and 8 relative to planning permission 20/01150/PP
(Erection of dwelling house) access arrangements. The site is located at; Rhu
Lodge, Ferry Road, Rhu, Helensburgh, which is within the minor settlement
boundary of Rhu, where policies LDP DM 1 and LDP SG HOU1 of the adopted
Local Development Plan accepts the principle of small scale development (5
dwellings or less). The site is also within the Rhu Conservation Area; where polices
LPD 3 and SG LPD ENV 17 of the adopted Local Development Plan require that
Page 72

Page 73

any new development within these areas must be of the highest quality and respect
and enhance the Conservation Area. 
It is noted that the principle of development has been established under the
previous consent (ref: 20/01150/PP). This application solely relates to the variation
of roads conditions; numbers 3, 4, 5 and 6 and removal of conditions 7 and 8
relative to planning permission 20/01150/PP. 
Set out below is the main assessment from the previous consent which establishes
the principal of development on the site; 
‘Planning Permission is sought for the erection of a dwelling house within the
garden ground of; Rhu Lodge, Ferry Road, Rhu, Helensburgh. The site is within the
minor settlement boundary of Rhu, where policies LDP DM 1 and LDP SG HOU1 of
the adopted Local Development Plan accepts the principle of small scale
development (5 dwellings or less). The site is also within the Rhu Conservation
Area; where polices LPD 3 and SG LPD ENV 17 of the adopted Local Development
Plan require that any new development within these areas must be of the highest
quality and respect and enhance the Conservation Area. Within these areas
location, siting, design, materials and boundary treatments must all be high quality
and tree protection / management will be essential. The site area is approximately
1000 square metres with the site itself being generally level with a gentle slope to
the South Eastern boundary. The surrounding area is established residential. 
The site is bounded to the South East by a 2 metre high stone wall. In front of this
stone wall is the access road – Ferry Road. The proposed house plot is located to
the Southern corner of the site in front of an existing garage. There have been a
number of consents for domestic development and extension on this site. None of
these consents are located within the proposed development area for this dwelling
house. It is proposed to sub-divide the garden ground of Rhu Lodge which at
present has two vehicular accesses off Ferry Road. It is proposed that the garden
ground is divided to give this new proposed dwelling house sole access via the
existing Southern access and furthermore it is proposed that the land allocated to
this proposal will include the existing detached double garage. There are two
mature beech trees located on the proposal site however the dwelling house has
been positioned to avoid these trees and furthermore raft foundation have been
proposed over typical trench foundations to again avoid impact on the roots of
these trees. 
The proposed new dwelling house is set back from the existing stone boundary wall
by approximately 8 metres and has a footprint of approximately 110 square metres.
The dwelling house will be 1.5 storeys high (eaves approximately 8m above ground
level) and will be of a contemporary ‘boat house’ style. The two bedroom will be
located on the ground floor with the open plan living accommodation above on the
first floor. The proposed external materials are; walls & roof – standing seam zinc
(front inset elevation to have small area of timber cladding), rainwater goods –
folded PPC coated steel, base course – engineering brick, windows (including roof
lights) & doors – dark grey alu-clad. There will be a small area of decking to the
front of the proposal with a glass balustrade. 
The proposal requires careful consideration in relation to the surrounding
Conservation Area in terms of design. The primary matters for determination relate
Page 73

Page 74

to scale, siting, residential amenity and materials to ensure that a high quality
development is delivered. The proposed contemporary ‘boat house’ style dwelling
is of a high quality architectural design that is well detailed and utilises high quality
materials. The scale is appropriate to the site and wider conservation area. The
proposal is not considered over development of the site as the overall Rhu Lodge
site ownership extends to approximately 10500 square metres with the new site
boundary of the proposal extending to approximately 1000 square metres and the
new dwelling house having an approximate foot print of 110 square metres. 
The Area Roads Manager has provided observations and conditions that will be
appended to this report to ensure the means of vehicular access, sightlines and
parking/turning arrangements will be subject to further assessment by the Planning
Authority.   
Furthermore a connection to the existing public sewer may require further consents
from the Water Authority and all hardstanding areas shall comply with SUDS
regulations. These matters can be secured by notes to applicant or safeguarding
condition and be in accordance with supplementary guidance SG LDP SERV 2 -
Incorporation of Natural Features / Sustainable Drainage Systems (SuDs). 
Taking account of the above, it is recommended that planning permission be
granted. The site is within the settlement boundary where there is a presumption in
favour residential developments.  The proposed plot is considered to be acceptable
and it is considered to be of a density comparable with other plots in the area.  The
scale and design is acceptable and there are no issues with regards to loss of
amenity to surrounding properties or the wider area.  The proposals raise no issues
in terms of overlooking or loss of daylight / privacy to surrounding properties. It is
therefore considered that the proposal is in accordance with Policies LDP START1,
LDP DM1, LDP 3, LDP 9, SG LDP ENV 17, SG LDP - Sustainable Siting and
Design Principles, SG LDP HOU 1, SG LDP TRAN 4 and SG LDP TRAN 6 of the
Argyll & Bute Council Local Development Plan.’ 
As part of the previous approval’s (ref: 20/01150/PP) determination process, upon
receipt of the roads officers consultation response the applicant was contacted by
the planning authority to flag-up the roads conditions to ensure they were aware of
them and could meet them. The applicant responded that they were aware of the
roads conditions and were not concerned. It is noted at this point, if the applicant
had informed the planning authority that they could not meet the required roads
conditions then we would have proceeded with a recommendation for refusal on
roads grounds. 
It is noted that during the determination process a revised package of information
was submitted by the applicants which included a set of revised drawings, a report
by ECS Transport Planning Ltd and a covering letter from the agent which details
the basis of their reasoning behind their proposal to vary / remove the roads
conditions relative to planning permission 20/01150/PP and what variations /
omissions are being proposed. The roads officer was subsequently re-consulted on
the basis of this revised package of information and in turn the applicants have
passed comment on this consultation, to which the roads officer has provided a
further response. 
Page 74

Page 75

This application solely relates to the variation of roads conditions; numbers 3, 4, 5
and 6 and removal of conditions 7 and 8 relative to planning permission
20/01150/PP. The previous conditions as per 20/01150/PP, the proposed
variations/omissions and the roads officers’ consultation response to this
application are assessed in Appendix A. 
On the basis of the assessment in Appendix A, subject to planning conditions, it is
considered that the proposed development is in accordance with the relevant
provisions of the Argyll and Bute Local Development Plan – 2015 and all other
associated guidance. 
(Q) Is the proposal consistent with the Development Plan: Yes 
(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Granted: 
It is considered that, subject to planning conditions, the proposed development is in
accordance with all relevant provisions of the Argyll and Bute Local Development
Plan and does not give rise to any other material land-use planning matters such as
would warrant a departure to these provisions 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
Not applicable – It is considered that the proposed development accords with all
relevant provisions of the Development Plan 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
No 
Author of Report: Emma Jane Date: 08.11.2022 
Reviewing Officer: Howard Young Date: 08.11.2022 
Fergus Murray
Head of Development & Economic Growth 
Page 75

Page 76

CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 21/02709/PP 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on
the application form dated 20/12/2021 and, the original approved drawings from
application ref; 20/01150/PP listed in the table below and the related amendment
approved under this unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town
and Country Planning (Scotland) Act 1997. 
Plan Title.  Plan Ref. No. Version Date
Received
Location Plan 1 of 14 A 02.02.2020
Site Photographs
Sheet 1
2 of 14 A 02.02.2020
Site Photographs
Sheet 2
3 of 14 C 02.02.2020
Site Photographs
Sheet 3
4 of 14 - 02.02.2020
Site Photographs
Sheet 4
5 of 14 - 02.02.2020
Site Plan/Roof Plan
as Proposed
6 of 14 C 02.02.2020
Floor Plans as
Proposed
7 of 14 A 02.02.2020
North and West
Elevations as
Proposed
8 of 14 B 02.02.2020
South and East
Elevations as
Proposed
9 of 14 B 02.02.2020
Cross Section X X
as Proposed
10 of 14 - 02.02.2020
Proposed
Landscape and
Planting Layout
Plan
11 of 14 - 02.02.2020
Topographic Survey 12 of 14 - 02.02.2020
Arboricultural
Report
13 of 14  - 02.02.2020
Design and Access
Statement 2020
14 of 14 - 02.02.2020 
Reason: For the purpose of clarity, to ensure that the development is implemented
in accordance with the approved details. 
2. Notwithstanding the effect of Condition 1; Prior to the commencement of
development the developer shall submit written evidence to the Planning Authority
that an agreement with Scottish Water is in place for the connection of the proposed
development to the public water supply. 
Page 76

Page 77

Reason: In the interests of public health and to ensure the availability of an
adequate water supply to serve the proposed development. 
3. Notwithstanding the effect of Condition 1; the following improvement works to the
access road are required: 
a) The provision of a 3.5 metre adopted road between A814 and the entrance
dwellings. 
b) Passing places at a maximum of 100 metre spacing’s should be provided as
per Operational Services Drg No SD 08/003 rev a. 
Full details of these proposed road improvements at Ferry Road shall be submitted
to and agreed in writing with the Planning Authority in consultation with the Council’s
Road Network Manager prior to works commencing on site. Thereafter the
improvements shall be completed and in place before the dwellinghouse hereby
approved shall be completed or brought into use. 
Reason: In the interest of road safety and in accordance with the Councils 'Roads
Guidance for Developers'. 
4. Notwithstanding the effect of Condition 1; In accordance with ‘Roads Guidance
For Developers’ a sightline visibility splay of 2.4 x 25 x 1.05 metres at the driveway
access with Ferry Road. Prior to work starting on site this visibility splay shall be
cleared of all obstructions over one metre in height above the level of the adjoining
carriageway and thereafter shall be maintained clear of all obstructions over one
metre in height to the satisfaction of the Planning Authority. 
Reason: In the interest of road safety and in accordance with the Council’s 'Roads
Guidance for Developers'. 
5. Notwithstanding the effect of Condition 1; The private access to the dwelling
house should be constructed as per Drg SD 08/002. 
Reason: In the interest of road safety and in accordance with the Council’s Roads
Guidance for Developers'. 
6.  Notwithstanding the effect of Condition 1; Prior to construction of the dwelling 
house, the private access shall be surfaced with bituminous material (or other
approved hard material) for a distance of 5m from the edge of the carriageway and
graded to prevent the discharge of water/materials onto the public road. 
Reason: In the interest of road safety and in accordance with the Council’s 'Roads
Guidance for Developers'. 
7.  Notwithstanding the effect of Condition 1; The gradient of the private accesses
will not exceed 5% for the first 5 metres and no more than 12.5% over the remainder
of the access. Details of this shall be submitted to and approved in writing by the
Planning Authority prior to works starting on site.
Page 77

Page 78

Reason: In the interest of road safety and in accordance with the Council’s 'Roads
Guidance for Developers'. 
8.  Notwithstanding the effect of Condition 1; Prior to work starting on site full details
of 2 No. parking spaces to be provided within the curtilage of the dwellinghouse shall
be submitted to and approved in writing by the Planning Authority. Thereafter the
required car parking spaces shall be fully implemented prior to the occupation of the
dwellinghouse.  
Reason: In the interest of road safety and in accordance with the Council’s 'Roads
Guidance for Developers'. 
9. Notwithstanding the effect of Condition 1; Samples of the proposed materials to be
used for the external walls and roof of the development hereby granted consent shall
be submitted to and approved in writing by the Planning Authority prior to any work
starting on site. 
Reason: In the interests of visual amenity and in order to integrate the proposal with
its surroundings. 
Page 78

Page 79

NOTE TO APPLICANT 
•The proposed road improvements to the existing private road to bring it to an
adoptable standard will require the submission of an application for a roads
construction consent. After subsequent Approval a finance security road bond will be
required to be lodged before any works commence on site. 
Page 79

Page 80

APPENDIX A – RELATIVE TO APPLICATION NUMBER: 21/02709/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
A. Settlement Strategy 
The application site is located within the minor settlement boundary of Rhu, where
policies LDP DM 1 and LDP SG HOU1 of the adopted Local Development Plan accepts
the principle of small scale development (5 dwellings or less). 
It is therefore considered that the original proposed development for a dwellinghouse
is consistent in principle with the LDP Settlement and Spatial Strategy. 
B. Location, Nature and Design of Proposed Development 
The application site area is approximately 1000 square metres and sits within the
garden ground of; Rhu Lodge, Ferry Road, Rhu, Helensburgh. The site is generally
level with a gentle slope to the South Eastern boundary. The surrounding area is
established residential. The site is bounded to the South East by a 2 metre high stone
wall. In front of this stone wall is the access road – Ferry Road. 
The principle of development has been established under the previous consent (ref:
20/01150/PP), as such the key issues in this instance do not relate to establishing the
principal of development but to the roads and access issues. An extract from the
original report justifying the dwellinghouse is included above. 
C. Road Network, Parking and Associated Transport Matters. 
The site is served by an existing private road, Ferry Road. Policy LDP 11 and SG LDP
TRAN 4 generally require that new development is served by an appropriate standard
of access and SG LDP TRAN 6 requires that adequate provision is made for off-street
car parking in accordance with approved parking standards. 
The consultation response from the Council’s Area Roads Engineer has noted that in
accordance with SG LDP TRAN 4; 
(A) Developments shall be served by a public road (over which the public have right of
access and maintainable at public expense; 
Except in the following circumstances:-
(2) Further development that utilises an existing private access or private road will only
be accepted if:- 
(i) the access is capable of commensurate improvements considered by the Roads
Authority to be appropriate to the scale and nature of the proposed new development
and that takes into account the current access issues (informed by an assessment of
usage); AND the applicant can; 
(ii) Secure ownership of the private road or access to allow for commensurate
improvements to be made to the satisfaction of the Planning Authority; 
Further to this the roads officer has noted the following issues with the current access;   
Page 80

Page 81

1. Existing carriageway width is less than the acceptable carriageway width of 3.5m for
emergency services vehicles
2. No intervisible Passing Places
3. No formal turning head 
SG LDP TRAN 4 notes that the private access shall be constructed to incorporate
minimum standards to function safely and effectively as set out in the Council’s Road
Development Guide, in particular in relation to adequate visibility splays, access
gradients, geometry, passing places, boundary definition, turning capacities, integrated
provision for waste management and recycling. 
When reviewing the below planning conditions ‘Circular 4/1998: The use of
conditions in planning permissions’ has been considered and in particular the six
tests as follows; 
Conditions imposed on a grant of planning permission can enable many 
development proposals to proceed where it would otherwise have been necessary to 
refuse planning permission. While the power to impose planning conditions is very 
wide, it needs to be exercised in a manner which is fair, reasonable and practicable. 
Planning conditions should only be imposed where they are: 
 Necessary
 relevant to planning
 relevant to the development to be permitted
 enforceable
 precise
 reasonable in all other respects 
Set out below are the original conditions together with the suggested amendments
and an analysis in conjunction with the roads area manager. 
Condition 3 as per approval reference 20/01150/PP; 
Notwithstanding the effect of Condition 1; the following improvement works to the
access road are required: 
a) The provision of a 3.5 metre adopted road between A814 and the entrance
dwellings.
b) Passing places at a maximum of 100 metre spacing’s should be provided as per
Operational Services Drg No SD 08/003 rev a. 
Full details of these proposed road improvements at Ferry Road shall be submitted to
and agreed in writing with the Planning Authority in consultation with the Council’s
Road Network Manager prior to works commencing on site. Thereafter the
improvements shall be completed and in place before the dwellinghouse hereby
approved shall be completed or brought into use. 
Page 81

Page 82

Reason: In the interest of road safety and in accordance with the Councils 'Roads
Guidance for Developers'. 
Proposed change as per this application;
The applicants wish to replace conditions 3a & b with the following; 
Notwithstanding the effect of Condition 1; prior to the first occupation of the dwelling
hereby approved, the following improvement works to the access road are required: 
The provision of a private access road, between the A814 and the entrance to the
approved new dwelling, with a minimum width of 3.5 metres, incorporating the traffic
calming measures as shown on approved ECS drawing number 22034_006, and
drawings 19/20/R2 Rev A, 19/20/R4 Rev B, 19/20/R5 Rev B, 19/20/R7 Rev B and
19/20/R9 Rev B. 
The applicants have provided a detailed reasoning as to why this condition should be
changed, which has been summarised below; 
The applicants have stated that the local roads officer fails to provide reasons to
demonstrate that the additional traffic generated from a new single dwelling would
make Ferry Road unsafe. They also note that condition 3 (a) requires a 3.5 metre
adopted road; however, this fails to adhere to the National Road Development Guide,
their reasoning behind this is to ensure that the utility providers are able to gain access
to their apparatus in the future and if Ferry Road is required to be reconstructed to an
adoptable standard it would be necessary to provide a 5.5 metre wide carriageway not
3.5 metres. 
In terms of 3 (b) the applicants have noted that the minimum standard detailed for a
private access within the Council’s LP and LDP allow for a 4.5 metre width for a
distance of 10 metres from the junction with the public road. As a 4.5 metre access
width is acceptable at the location with the highest risk. The passing place design
should take account of the setting of the place and the type of traffic travelling along
the route. Except for the bin lorry the general vehicle movements are standard motor
cars. Therefore, the requirement for all passing places to be 5.5 metres wide is an over
engineered solution. 
Conclusion; 
The roads officer has concluded that conditions 3a & 3b should remain unchanged for
the reasons detailed below; 
In response to the above the roads officer has provided an extract from the National
Roads Development Guidance, paragraph 3.1.6 (e), Services in Shared Surfaces,
which facilitates service strips within the running surface and notes that manholes
should be located within parking areas or widened areas within the total road width.
Therefore, the roads officer notes that it would be possible for utility providers to gain
access to their apparatus on a 3.5 metre wide carriageway. The roads officer has also
noted; the provision of 3.5m adoptable road accounts for the presence of the existing
verge, were the carriageway to be bound by a wall, the minimum width for emergency
service vehicles, as per the National Roads Development Guide is 3.7m. A minimum
road width of 3.5 plus verge is therefore, required to facilitate safe access and egress
of pedestrians, vehicles and emergency service vehicles. In addition, roads have
commented that the surfacing extents shown with drawing 19/20/R9B do not comply
Page 82

Page 83

with the aforementioned condition to provide a 3.5 metre adopted road between the
A814 and the entrance dwellings. 
The roads officer has also advised that a lack of forward visibility has underlined the
requirement for localised carriageway widening to 5.5m at points of intervisibility. To
allow any further development on this private access road, intervisible passing places
must be provided and constructed in accordance with SD08/003. All vehicle passing
places should be constructed in accordance with the minimum geometry requirements
set out with SD08/003. They also note that on review of drawing 22034_006 and in
accordance with the National Roads Development Guide, all intervisible passing
places should provide a minimum width, throughout its length, of 5.5 metres, note this
should be shown over the length of the intervisible passing place and not solely at the
radius/ access point. 
Further to the above the roads officer has advised that as the existing road currently
serves 10 dwellings and a hotel, the private access road is deemed substandard and
will, in the interest of pedestrian and vehicle safety require improvements prior to any
further development. The roads officer has further commented that on review of the
revised drawings the removal of an existing verge/ pedestrian ‘step-off’, between the
A814 and the access to the Rosslea property, to achieve a minimum carriageway width
is considered an unacceptable method towards achieving a minimum carriageway
width. This is in direct contradiction of the hierarchy of road users and, places vehicle
traffic over pedestrian movements. As such, the removal of any existing verge/ ‘step-
off’ would not be supported. 
Condition 4 as per approval 20/01150/PP; 
Notwithstanding the effect of Condition 1; In accordance with ‘Roads Guidance For
Developers’ a sightline visibility splay of 2.4 x 42 x 1.05 metres at the driveway access
with Ferry Road. Prior to work starting on site this visibility splay shall be cleared of all
obstructions over one metre in height above the level of the adjoining carriageway and
thereafter shall be maintained clear of all obstructions over one metre in height to the
satisfaction of the Planning Authority. 
Reason: In the interest of road safety and in accordance with the Councils 'Roads
Guidance for Developers'. 
Proposed change as per this application;
The applicants wish to replace condition 4 with the following; 
Notwithstanding the effect of Condition 1; prior to the first occupation of the dwelling
hereby approved, the access to the dwelling hereby permitted shall be formed in
accordance with the details shown on approved ECS drawings number 22034_006
and drawing 19/20/R10. The access shall incorporate visibility splays measuring 2 x
25 x 1.05 metres, and these shall be maintained in perpetuity, unless otherwise agreed
in writing with the Local Planning Authority. 
Conclusion; 
The roads officer has concluded that condition 4 should be altered for the reasons
detailed below; 
Page 83

Page 84

The original roads consultation response to application 20/01150/PP noted a sightline
visibility splay of 2.4 x 25 x 1.05 metres at the driveway access with Ferry Road.
Whereas the decision notice noted 2.4 x 42 x 1.05 metres. Therefore this condition
should be altered to; 
Notwithstanding the effect of Condition 1; In accordance with ‘Roads Guidance For
Developers’ a sightline visibility splay of 2.4 x 25 x 1.05 metres at the driveway access
with Ferry Road. Prior to work starting on site this visibility splay shall be cleared of all
obstructions over one metre in height above the level of the adjoining carriageway and
thereafter shall be maintained clear of all obstructions over one metre in height to the
satisfaction of the Planning Authority. 
Reason: In the interest of road safety and in accordance with the Councils 'Roads
Guidance for Developers'. 
Condition 5 as per approval 20/01150/PP; 
Notwithstanding the effect of Condition 1; The private access to the dwelling house
should be constructed as per Drg SD 08/002. 
Reason: In the interest of road safety and in accordance with the Councils 'Roads
Guidance for Developers'. 
Proposed change as per this application;
The applicants wish to replace condition 5 with the following; 
Notwithstanding the effect of Condition 1; Prior to the first occupation of the dwelling
hereby permitted, the parking and turning provisions as shown on approved Drawing
19/20/10 shall be implemented in full. Thereafter the approved parking and turning
provisions shall be maintained in perpetuity, unless otherwise agreed in writing with
the Local Planning Authority. 
The applicants have provided a detailed reasoning as to why this condition should be
changed, which have been summarised below; 
The applicants have stated that the local roads officer fails to recognise that this private
access is in fact an individual driveway for which the minimum width of 2.75 metres is
all that is required to be in accordance with the National Road Development Guide.
The applicants have also noted; that the gradient shown is less than the 12.5% (1 in
8), the existing levels show a gradient 1 in 11.6 (8.5%) this is below the maximum
gradient requirements and they have confirmed that it would be possible to provide
drainage to prevent surface water discharge. 
Conclusion; 
The roads officer has concluded that condition 5 should remain unchanged for the
reasons detailed below; 
Page 84

Page 85

The roads officer has noted that the access should be constructed in accordance with
SD08/002 titled, Private Drive Way from Un-kerbed Road. Within which, drawing note
6 details “Where access is bounded by walls the minimum width will be 3.7m.”
therefore, 2.75m is unacceptable. Furthermore, the roads officer has commented on
drawing 19/20/R10 and notes, that this drawing fails to detail a minimum access width
of 4.5m, does not achieve the drainage requirements defined with SD 08/002A and
fails to detail the radius of the realigned boundary walls. 
Condition 6 as per approval 20/01150/PP; 
Notwithstanding the effect of Condition 1; The private access shall be surfaced with
bituminous material for a distance of 5 metres from the edge of the carriageway and
graded to prevent the discharge of water/materials onto the public road. 
Reason: In the interest of road safety and in accordance with the Councils 'Roads
Guidance for Developers'. 
Proposed change as per this application;
The applicants wish to remove condition 6 as they believe this condition conflicts with 
condition 5 which allows for a bituminous or concrete surface, and they have 
suggested that it is not unreasonable to vary the condition to allow for any other 
approved hard material. 
Conclusion; 
The roads officer has concluded that condition 6 can be amended as follows; 
Notwithstanding the effect of Condition 1; Prior to construction of the dwelling 
house, the private access shall be surfaced with bituminous material (or other
approved hard material) for a distance of 5m from the edge of the carriageway and
graded to prevent the discharge of water/materials onto the public road. 
Reason: In the interest of road safety and in accordance with the Councils 'Roads
Guidance for Developers'. 
Condition 7 as per approval 20/01150/PP; 
Notwithstanding the effect of Condition 1; The gradient of the private accesses will not
exceed 5% for the first 5 metres and no more than 12.5% over the remainder of the
access. 
Reason: In the interest of road safety and in accordance with the Councils 'Roads
Guidance for Developers'. 
Proposed change as per this application;
The applicants wish to remove condition 7 as the gradient requirements have been
detailed within the most recent drawing package. 
Page 85

Page 86

Conclusion; 
The roads officer notes that whilst the gradient requirements have been detailed within
the most recent drawing ref; 19/20/R10, there are other elements included within this
drawing which are not in accordance with roads guidance. Therefore, this condition
shall remain as part of the application review to ensure implementation. However, it is
noted that the phasing was not included within this condition and therefore, the roads
officer has concluded that condition 7 can be amended as follows;     
Notwithstanding the effect of Condition 1; The gradient of the private accesses will not
exceed 5% for the first 5 metres and no more than 12.5% over the remainder of the
access. Details of this shall be submitted to and approved in writing by the Planning
Authority prior to works starting on site. 
Reason: In the interest of road safety and in accordance with the Councils 'Roads
Guidance for Developers'. 
Condition 8 as per approval 20/01150/PP; 
Notwithstanding the effect of Condition 1; The provision for car parking within the
curtilage of each dwelling shall be in accordance with the Council’s Local Development
Plan supplementary guidance SG LDP TRAN 6 Vehicle Parking Provision. 
Reason: In the interest of road safety and in accordance with the Councils 'Roads
Guidance for Developers'. 
Proposed change as per this application;
The applicants wish to remove condition 8 as the parking provision requirements have
been detailed within the most recent drawing package. 
Conclusion; 
The roads officer notes that whilst the parking provision requirements have been
outlined within the most recent drawing ref; 19/20/R10, there are other elements
included within this drawing which are not in accordance with roads guidance.
Therefore, this condition shall remain as part of the application review to ensure
implementation. However, it is noted that the phasing was not included within this
condition and therefore, the roads officer has concluded that condition 8 can be
amended as follows;   
Notwithstanding the effect of Condition 1; Prior to work starting on site full details of 2
No. parking spaces to be provided within the curtilage of the dwellinghouse shall be
submitted to and approved in writing by the Planning Authority. Thereafter the required
car parking spaces shall be fully implemented prior to the occupation of the
dwellinghouse.  
Reason: In the interest of road safety and in accordance with the Councils 'Roads
Guidance for Developers'. 
Page 86

Page 87

When reviewing the above planning conditions it is considered that they do meet the
six tests as per ‘Circular 4/1998: The use of conditions in planning permissions’.
Based on the above assessment, it is considered that subject to the revised
conditions set out above, the proposed development is in accordance with the
relevant provisions of the Argyll and Bute Local Development Plan – 2015 and all
other associated guidance.   
Page 87

Page 88

This page is intentionally left blank

Page 89

Page 89

Page 90

This page is intentionally left blank

Page 91

Argyll and Bute Council  
Development and Economic Growth       
This Supplementary report is a recommended response to the Scottish Government’s
Energy Consents and Deployment Unit (ECDU) Section 36 consultation on the
proposed Rowan wind farm on Land Approximately 4.5km North West of Tarbert, Argyll
& Bute
_________________________________________________________________________     
Reference No: 22/00385/S36     
Applicant:       The Scottish Government on behalf of EnergieKontor UK Ltd
Proposal:  Electricity Act Section 36 consultation relevant to Rowan Wind Farm  
Site Address:  Land Approximately 4.5km North West of Tarbert, Argyll & Bute  
________________________________________________________________________   
SUPPLEMENTARY REPORT NO. 3 
1. INTRODUCTION 
This proposal was originally presented to committee on the 28th of September 2022. Three
reports were considered: the Report of Handling; and Supplementary Reports 1 and 2. The
Committee agreed on behalf of the Council, as Planning Authority, to object to this proposal
for the reasons detailed in the Report of Handling. The Energy Consents Unit was notified of
this decision accordingly. The consultation with the Energy Consent concluded and because
of the objection from the Planning Authority, in terms of the Electricity Act, if that objection is
not withdrawn, the Scottish Ministers must cause a Public Inquiry to be held. 
2. RE-CONSULTATION 
The Energy Consents Unit reconsulted the Planning Authority on the 14th of December 2022.
The reason for this being that Revised Draft NPF4 (National Planning Framework 4) had been
laid in Parliament. If approved by Parliament and adopted by Scottish Ministers, the draft as
laid NPF4 will become part of the Development Plan. As the Planning Authority’s consultation
response of 28th September 2022 was provided prior to the NPF4 being laid, the Scottish
Government would like to give the Planning Authority the opportunity to provide further
comment on NPF4. They have advised that there is no need to repeat comments previously
provided. The Scottish Government are interested in the Councils view on the implications of
this document and in particular sections on: Natural Places (page 40) and Energy (pages
53/54). 
As this S36 consultation was not a delegated item in terms of the Council’s Constitution,
Officers do not have the authority to give the Council’s view in relation to NPF4 without first
presenting a report to PPSL committee. This report therefore seeks Members’ agreement on
Officers’ further consultation response to the ECU. 
3. STATUS OF NPF4 
The status of NPF4 has changed since the Council was reconsulted and is likely to change
again prior to the committee considering this report. NPF4 2022, received final approval from
the Scottish Parliament on 11 January 2023 and awaits adoption by the Scottish Ministers. It
Page 91 Agenda Item 6

Page 92

is understood that NPF4 2022 will be adopted on 13th February 2023. At that time, it will
replace National Planning Policy 3 (NPF3) and Scottish Planning Policy 2014 (SPP). and will
become the national element of the statutory development plan – for all parts of Scotland. This
report has, therefore, been prepared on the assumption that NPF4 2022 has been adopted by
the Scottish Government and SPP and NPF3 have been superseded. NPF4 should now be
given significant weight in the decision-making process. 
4. ASSESSMENT AGAINST NPF4 
As requested by the Scottish Government, Officers recommend the following views on the
implications of NPF4 and sections on: Natural Places (page 40) and Energy (pages 53/54)
are relayed to the ECU as the Planning Authority’s position on this application. 
The Spatial Strategy in NPF4 sets out that we are facing unprecedented challenges and that
we need to reduce greenhouse gas emissions and adapt to future impacts of climate change.
It sets out that that Scotland’s environment is a national asset which supports our economy,
identity, health, and wellbeing. It sets out that we have already taken significant steps towards
decarbonising energy and land use, but choices need to be made about how we can make
sustainable use of our natural assets in a way which benefits communities. The Spatial
Strategy reflects legislation in setting out that decisions require to reflect the long-term public
interest. However, in doing so it is clear that we will need to make the right choices about
where development should be located ensuring clarity is provided over the types of
infrastructure that needs to be provided and the assets that should be protected to ensure
they continue to benefit future generations. The Spatial Priorities support the planning and
delivery of sustainable places, where we reduce emissions, restore, and better connect
biodiversity; liveable places, where we can all live better, healthier lives; and productive
places, where we have a greener, fairer, and more inclusive wellbeing economy. 
Eighteen national developments support this strategy. National developments will be a
focus for delivery, as well as exemplars of the Place Principle, placemaking and a Community
Wealth Building (CWB) approach to economic development. The type of development subject
to this application is identified generically as a national development of “Strategic Renewable
Electricity Generation” given it has the capacity to generate and store more than 50MW. There
is in principle support for national scale developments as they have been identified of national
importance in the delivery of Scotland’s Spatial Strategy. However, any project identified as a
national development requires to be considered at a project level to ensure all statutory tests
are met. This includes consideration against the provisions of the Development Plan, of which
National Planning Framework 4 is now a part. 
NPF4 - Policy 11: Energy – The intention of Policy 11 is to encourage, promote and facilitate
all forms of renewable energy development onshore and offshore (including wind farms and
battery storage). The policy outcome is expansion of renewable, low-carbon and zero
emissions technologies. Policy 11 sets out that development proposals for all forms of
renewable energy (including wind farms) will be supported. This policy continues to set out
that proposals will only be supported where they maximise net economic impact, including
local and community socio-economic benefits such as employment, associated business and
supply chain opportunities. Furthermore, applications need to demonstrate how, through
project design and mitigation, the impact on a range of considerations has been addressed.
This allows for consideration of matters related to impacts on communities and individual
dwellings in relation to amenity; landscape and visual impact; public access; aviation and
defence interests; telecommunications; traffic; historic environment; biodiversity (including
birds); impacts on trees; decommissioning; site restoration; and cumulative effects. 
Page 92

Page 93

While the weight to be given to each of the considerations in Policy 11 is a matter for the
decision maker, NPF4 is clear that significant weight will require to be placed on the
contribution of the proposal to renewable energy generation targets and on greenhouse gas
emission reduction targets. In relation to landscape and visual impacts it advises that where
impacts are localised and / or appropriate design mitigation has been applied such effects will
generally be considered acceptable. This support is not however to the exclusion of other
factors, a balance still requires to be struck in terms of the impact of development. NPF4 must
be read as a whole, and detailed consideration given to linked policies, such as Policy 4:
Natural Places, considered below. Project design and mitigation needs to show how impacts
(both individual and cumulative) on numerous receptors, including the natural environment
have been addressed.
NPF4 Policy 4: Natural Places – The intention of Policy 4 is to protect, restore and enhance
natural assets, making the best use of nature-based solutions. The policy outcome is that
natural places are protected and restored, and natural assets are managed in a sustainable
way that supports and grows their essential benefits and services. Of relevance to this
proposal is policy 4(a) which sets out that development proposals which by virtue of type,
location or scale will have an unacceptable impact on the natural environment will not be
supported.
Landscape & Visual Impact (including cumulative) - As detailed in the Report of Handling, and
Supplementary Reports 1 and 2, it is considered that the proposed development will have
significant adverse landscape and visual impacts (including cumulative) which will have an
unacceptable impact on the environment. Following the introduction of NPF4, this matter has
been revisited and assessed in the context of this new policy document. To help with this,
further advice has also been sought from the Councils Landscape Consultant. The outcome
being that a different view has been reached in regard to the Landscape & Visual Impact
(including cumulative) which focuses on the regional impacts of the proposal. 
The proposed development site lies within the Knapdale Upland Forest Moor Mosaic
Landscape Character Type (LCT) which covers much of the Knapdale area between West
Loch Tarbert and the southern edge of the Knapdale National Scenic Area. This landscape
has a simpler landform in the south-west but is complex and craggy in the north-east.
This proposal, which comprises very large turbines of up to 200m, would be sited in a basin
which reduces its prominence and intrusion seen from Loch Fyne and from the settled eastern
coastal fringes of this loch. The containment provided by landform is however diminished in
views from the south around West Loch Tarbert where turbines would be visible in closer
proximity and where their scale would be more appreciated due to greater visual exposure
and because they would be seen in close conjunction with the smaller scale settled loch
fringes. The proposal would significantly affect the character of West Loch Tarbert and views
from the A83, the Islay ferry route, settlement and recreation routes on the south-eastern
shores of the loch. Proposed aviation lighting would increase the duration of these significant
adverse effects. While it is acknowledged that the extent of these significant adverse
landscape and visual effects is confined to the waters and south-eastern shores of West Loch
Tarbert and the proposal is well screened and/or distant from other sensitive locations, there
is concern about the effects on the tourist routes of the A83 and the Islay ferry which are
regionally important within Argyll and Bute. 
The potential cumulative effects of visible aviation lighting on character and views are also a
concern given the number of recent applications for turbines >150m in Argyll & Bute requiring
such lighting, including application stage: Narachan, Earraghail, Clachaig Glen and this
proposal although we consider that these effects could be mitigated to an acceptable degree
by the adoption of an Air Detection Lighting System which would significantly reduce the
duration of visible night-time lighting. 
Page 93

Page 94

The principal concern is, however, the cumulative landscape and visual effects likely to occur
with the application-stage Sheirdrim wind farm. If the Sheirdrim proposal is consented on
appeal, it is considered that the addition of the Rowan proposal would result in significant
combined cumulative landscape and visual effects on the West Loch Tarbert area with a
substantial increase in the extent of major adverse effects. It is considered that the nature of
these significant effects on landscape and visual interests would be of regional importance,
affecting not just the tourist routes of A83 and the Islay Ferry but also settlement and recreation
routes including views to and from the nationally important scheduled monument of Dun Skeig. 
In conclusion, it is considered that the cumulative landscape and visual impact of this proposal
with Sheirdrim is unacceptable, and the proposed development is contrary to the provisions
of Policy 11 – Energy of National Planning Framework 4 (NPF4)  and Policy 4 – Natural Places
in this regard.
Aviation Impact - As detailed in the Report of Handling, and Supplementary Reports 1 and 2,
it is considered that the proposed development will have an adverse impact on aviation due
to unresolved aviation objections from National Air Traffic Services (NATS) and Glasgow
Prestwick Airport (GPA). Following the introduction of NPF4, this matter has been revisited
and assessed in the context of this new policy document. Policy 11 requires consideration to
be given to such matters. The Applicant has advised that these objections are unlikely to be
resolved before Committee. Consequently, it is considered that there is no need to alter the
Councils earlier reason for objection in this regard which includes a caveat that Argyll & Bute
Council would no longer object on the grounds of adverse aviation impact if NATS and GPA
withdraw their objections. 
In conclusion, as there are outstanding aviation objections it is concluded that the proposed
development is contrary to the provisions of Policy 11 – Energy of National Planning
Framework 4 (NPF4) in this regard. 
5. CONCLUSION & RECOMMENDATION
While NPF4 sets out that wind energy developments are to be supported, and significant
weight must be given to the global climate emergency and nature crises. This is not however,
blanket support without qualification, the support is in principle, and it is for the decision maker
to take account of all other relevant policies. In considering the appropriateness of the
development, while significant weight has been given to these matters, the cumulative
landscape and visual impact of this proposal with Sheirdrim and outstanding aviation
objections are considered to outweigh the benefits of the development in relation to
contribution towards energy targets and limited socio-economic benefits. It is clear from NPF4,
that whilst more weight must be given to the climate emergency, there is still not a policy
expectation that an adverse impact on the environment should be accepted as the price to
pay for the ability to satisfy these commitments. The natural environment also requires to be
seen as a finite resource worthy of protection. It must be recognised that such support should
only be given where justified. 
Having considered NPF4 it is recommended that the Council as Planning Authority continues
to object to this proposal for the revised reasons detailed below, and that the Scottish
Government be notified accordingly. Members should note that an objection from the Council
will instigate the requirement for a Public Local Inquiry to be held. 
6. RECOMMENDED REASONS FOR OBJECTION TO: 22/00385/S36 
1. Landscape & Visual Impact (including cumulative) 
The proposed development site lies within the Knapdale Upland Forest Moor Mosaic
Landscape Character Type (LCT) which covers much of the Knapdale area between West
Page 94

Page 95

Loch Tarbert and the southern edge of the Knapdale National Scenic Area. This landscape
has a simpler landform in the south-west but is complex and craggy in the north-east. 
This proposal, which comprises very large turbines of up to 200m, would be sited in a basin
which reduces its prominence and intrusion seen from Loch Fyne and from the settled eastern
coastal fringes of this loch. The containment provided by landform is however diminished in
views from the south around West Loch Tarbert where turbines would be visible in closer
proximity and where their scale would be more appreciated due to greater visual exposure
and because they would be seen in close conjunction with the smaller scale settled loch
fringes. The proposal would significantly affect the character of West Loch Tarbert and views
from the A83, the Islay ferry route, settlement and recreation routes on the south-eastern
shores of the loch. Proposed aviation lighting would increase the duration of these significant
adverse effects. While it is acknowledged that the extent of these significant adverse
landscape and visual effects is confined to the waters and south-eastern shores of West Loch
Tarbert and the proposal is well screened and/or distant from other sensitive locations, there
is concern about the effects on the tourist routes of the A83 and the Islay ferry which are
regionally important within Argyll and Bute. 
The potential cumulative effects of visible aviation lighting on character and views are also a
concern given the number of recent applications for turbines >150m in Argyll & Bute requiring
such lighting, including application stage: Narachan, Earraghail, Clachaig Glen and this
proposal although we consider that these effects could be mitigated to an acceptable degree
by the adoption of an Air Detection Lighting System which would significantly reduce the
duration of visible night-time lighting. 
The principal concern is, however, the cumulative landscape and visual effects likely to occur
with the application-stage Sheirdrim wind farm. If the Sheirdrim proposal is consented on
appeal, it is considered that the addition of the Rowan proposal would result in significant
combined cumulative landscape and visual effects on the West Loch Tarbert area with a
substantial increase in the extent of major adverse effects. It is considered that the nature of
these significant effects on landscape and visual interests would be of regional importance,
affecting not just the tourist routes of A83 and the Islay Ferry but also settlement and recreation
routes including views to and from the nationally important scheduled monument of Dun Skeig. 
In conclusion, it is considered that the cumulative landscape and visual impact of this proposal
with Sheirdrim is unacceptable. 
Having due regard to the above it is concluded that the proposal will have significant
adverse cumulative landscape and visual impacts and is therefore inconsistent with
the provisions of: SG LDP ENV 14 –Landscape; SG 2 Renewable Energy; LDP STRAT 1
– Sustainable Development; LDP DM1 – Development within the Development
Management Zone; LDP 3 – Supporting the Protection, Conservation and Enhancement
of our Environment; Policy LDP 6 – Supporting the Sustainable Growth of Renewables;
LDP 9 – Development Setting, Layout and Design; of the Argyll & Bute Local
Development Plan; the Argyll & Bute Landscape Wind Energy Capacity Study 2017; the
Onshore wind policy statement and Policies 4 (Natural Places) and 11 (Energy) of
National Planning Framework 4 (NPF4) 
2. Aviation 
Page 95

Page 96

Argyll & Bute Council will assess development proposals with the aim of preventing
unnecessary dangers to aircraft. Policy requires that development is refused where it would
constrain the present and future operations of existing airports and airfields. 
National Air Traffic Services Safeguarding (NATS) have advised that an unacceptable
technical impact is anticipated, and they object. Glasgow Prestwick Airport advise that the
development raises aviation safety concerns which have an operational impact on the airport
as an air navigation services provider. Until all technical and operational aviation safety
matters are addressed to the satisfaction of Glasgow Prestwick Airport, and a mitigation
agreement is put in place for the life of the wind farm, the airport also objects to the proposal. 
Local Development Plan Policy is clear that developments that have an adverse impact on the
Safeguarding of Airports should be refused. 
Having due regard to the above it is concluded that due to the fact that National Air
Traffic Services Safeguarding (NATS) and Glasgow Prestwick Airport have advised the
Energy Consents Unit that they object to the proposal, it will have an adverse impact
on aviation and is therefore inconsistent with the provisions of SG 2 Renewable Energy,
Policy LDP 6 – Supporting the Sustainable Growth of Renewables and SG LDP TRAN 7
–Safeguarding of Airports of the Argyll & Bute Local Development Plan, the Onshore
Wind Policy Statement and Policy 11 (Energy) of the National Planning Framework 4 in
this respect. 
Argyll & Bute Council therefore object to the proposal due to the adverse impact it
would have on Aviation. The Energy Consents Unit should please note that if National
Air Traffic Services (NATS) and Glasgow Prestwick Airport withdraw their objections,
then Argyll & Bute Council would no longer object on these grounds. Should these
objections not be removed, and the proposal progresses to an Inquiry, Argyll & Bute
Council would defer to National Air Traffic Services and Glasgow Prestwick Airport as
the Technical Experts on this matter 
  
Author of Report: Arlene Knox        Date: 31st January 2023
Reviewing Officer: Sandra Davies       Date: 31st January 2023 
 
  
Fergus Murray   
Head of Development and Economic Growth  
   
Page 96

Page 97

Page 97

Page 98

This page is intentionally left blank

Page 99

Argyll and Bute Council
Development & Economic Growth   
Committee Planning Application Report and Report of Handling as required by
Schedule 2 of the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013 relative to applications for Planning Permission or
Planning Permission in Principle 
Reference No: 22/00728/PP
Planning
Hierarchy:
National Application
Applicant: Scottish Hydro Electric Transmission PLC
Proposal: To construct and operate a 132/ 275 kilovolt (kV) GIS substation and
associated infrastructure that will connect the existing 132 kV overheard
line (OHL) from Taynuilt to Inveraray to a proposed 275 kV OHL to
Dalmally.
Site Address:  Land approximately 2.5 km South West of Cladich, Argyll and Bute    
DECISION ROUTE 
Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
 Construction of substation platform (190m x 225m) to accommodate Gas
Insulated Switchgear (GIS)
 Erection of buildings, installation of electrical plant and erection of
perimeter security fencing
 Widening of existing forestry tracks (1,895m in length) and upgrading of
existing culverted watercourse crossing the River Aray
 Construction of 323m of new access track, comprising 108m connecting
the existing forest track to the substation site and 215m of access track
continuing around the substation site on the south east and north east
aspects
 Landscape planting
 SUDs, comprising four basins to the east of the substation platform
 Peat restoration on-site by way of dressing of substation platform slopes
and access tracks, as well as ditches and other cut areas 
(ii) Other specified operations
 Temporary site laydown area approximately 200m south east of the
substation site
 3.55ha of management felling to the northwest of substation site which
forms part of long-term forest plan for the area 
(B) RECOMMENDATION: 
Page 99 Agenda Item 7

Page 100

It is recommended that Members grant planning permission subject to the conditions
and reasons attached. 
(C) CONSULTATIONS:   
Transport Scotland (6th September 2022) – has no objection subject to the
inclusion of planning conditions, as outlined by the Area Roads Officer together with
the submission of a decommissioning plan. 
Scottish Environmental Protection Agency (13th October 2022) - has no
objection to the proposal subject to the inclusion of planning conditions. Regarding
the impacts on peat and carbon balance, SEPA welcome the design to minimise
the impact on deep peat, although confirm that 35,000m3 of peat will be disturbed
by the project. A small volume of this can be used for site reinstatement and it is
proposed that the rest be used in peatland restoration works on or in close proximity
to the wider overheard line project working corridor. SEPA are content with this
proposal and request a planning condition is applied for the agreement of a finalised
Peat Management Plan (PMP). 
Regarding flood risk and the water environment, SEPA request a planning condition
for the replacement of the existing River Aray water crossing and for the assurance
that the works are carried out in accordance with the submitted Schedule of
Mitigation and Outline Construction Environmental Management Plan. 
NatureScot (24th January 2023) – confirm the proposal falls othwith their
consultation threshold and have no specific comments. 
Scottish Rights of Way and Access Society – no response at time of writing. 
Historic Environment Scotland - no response at time of writing. 
ARGYLL & BUTE COUNCIL INTERNAL CONSULTATION RESPONSES 
Area Roads Oban (28th September 2022) – has no objection subject to the
inclusion of conditions. The Officer notes that the proposal is accessed by a private
track situated off the A819 Dalmally- Inveraray Road within a rural 60mph restriction
with upgrading required to the existing access. A Construction Traffic Management
Plan is required prior to the commencement of works which must take into account
further energy works in the Loch Awe area that could have a cumulative impact on
the local area roads. Further planning conditions required include maintenance of
visibility splays; the sheeting of construction LGVs transporting materials; wheel
cleansing facility prior to vehicles entering the public road; construction traffic
signage on the public road; and no erection of walls, fences hedges within 2m of
the public road junction. A Roads Openings Permit (s56) will be required to be
obtained from the Roads Authority. 
Biodiversity Officer (12th September 2022) has no objection to the proposal,
commenting that the proposal fits well with biodiversity objectives, with further
clarification to be provided through planning conditions regarding use of peat, and
identification of borrow pits and their restoration. 
Environmental Health Officer (1st February 2023) – no objection subject to
planning condition requiring the submission of a private water supply appraisal. 
Page 100

Page 101

West of Scotland Archaeology Service (7th September 2022) - requests the
inclusion of a planning condition for the agreement and implementation of a
programme of archaeological works in accordance with a written scheme of
investigation for the site. This is required as the development site lies in an area of
fairly rich archaeological remains from the prehistoric and medieval periods. The
proposals include the routes of two old roads, one of a possible drove road marked
on OS First Edition Maps and the other the recorded line of Wade’s Military Road.
The Officer however notes the area has been afforested and the current state of
both recorded sites is unknown, thus the requirement of the planning condition in
accordance with Scottish Planning Policy. 
Flood Risk Advisor (8th September 2022) - notes that the site elevations range
from approximately 200 metres Above Ordnance Datum to 250m AOD, with the
River Aray running through the north eastern section of the site under the existing
access track. The overall site boundary contains small, isolated locations indicated
to be at risk on the SEPA Pluvial Flood Risk maps, with depths expected to be
between 0.3-1m in these locations. It is expected that the proposed station building
will overlay these areas at risk. The Officer considers this is acceptable though
displaced surface water should be accounted for within the drainage design. The
proposed utilisation of SuDS detention basins and drainage ditches with water to
be attenuated and restricted to 50l/s before discharge to the River Aray is
considered acceptable. 
The River Aray at this location has a catchment area of <3km2 and is too small to
be considered by the SEPA Fluvial Flood Map. The siting of the substation at least
30m away from the watercourse on ground at least 5m above the watercourse is
acceptable. Given the pluvial flood risk to the site, the Officer recommends the
elevation of FFLs of buildings to 0.3m above surrounding ground level if practicable.
New watercourse crossings are to be designed such that post-development channel
capacity is the same or greater than pre-development channel capacity and a
planning condition is recommended to ensure adherence. 
Core Paths Access Technician (24th January 2023) – has no specific comments
on the application noting that the area does not appear to be heavily used by the
public for recreational activities. 
Glenorchy and Innishall Community Council – no response at time of writing. 
(D) HISTORY:   
Specific to the site: 
21/01230/PAN- Proposal of Application Notice for the erection of electricity
substation comprising platform area, control building, associated plant and
infrastructure, ancillary facilities, access track(s), laydown area(s) and landscape
works. Land East of Creag Dhubh, Cladich, Argyll and Bute. Opinion Issued 18
August 2021. 
21/02348/SCREEN- Screening Opinion for the installation of 132/275kV substation
and associated works. Creag Dhubh Substation. Screening opinion issued on 16
March 2022 
Of relevance: 
Page 101

Page 102

21/00286/SCOPE- Scoping request for proposed Section 37 application for the
proposed Creag Dhubh to Dalmally 275 kV connection. Scoping opinion issued on
30 June 2021. 
22/02305/S37- Section 37 Application for Creag Dhubh to Inveraray 275kV
Overhead Line. Creag Dhubh To Inveraray Overhead Line, Inveraray Estate
Woodland, Inveraray, Argyll and Bute. Under Consideration. 
(E) PUBLICITY:   
MREG20- Regulation 20 Major Application Advert – Expired on 22nd September
2022 
(F) REPRESENTATIONS:   
(i) Representations received from: 
At the time of writing, no letters of public representation have been received. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: No 
(ii) An appropriate assessment under the Conservation
(Natural Habitats) Regulations 1994:   
No 
(iii) A design or design/access statement:    Yes – included
within the
Environmental
Appraisal
Report.  
(iv) A report on the impact of the proposed development
eg. Retail impact, transport impact, noise impact, flood
risk, drainage impact etc:   
Environmental Appraisal Report,
Planning Statement, 
Pre-application Consultation Report 
The Environmental Appraisal Report covers the following
topics:
 Proposed Development
 Design and Alternatives
 Landscape and Visual Amenity
 Cultural Heritage and Archaeology
 Ecology and Ornithology
Yes 
Page 102

Page 103

 Hydrology and Hydrogeology
 Traffic and Transport
 Noise
 Schedule of Mitigation
 Cumulative Effects 
The supporting Technical Annexes includes:
 EIA Screening Opinion Request Report and Adopted
Screening Opinion
 Consultation Register
 Outline Construction Environmental Management Plan
 Woodland Report
 Cultural Heritage Assets in the Inner  and Outer Study
Areas
 Ecology Methodology and Results
 Habitats Regulations Appraisal
 Draft Peat Management Plan and Peat Depth Survey
Results
 SUDs technical memo
 Peat Landslide and Hazard Risk Assessment
 Acoustics Glossary
 Anticipated Construction Equipment   
(H) PLANNING OBLIGATIONS 
Is a Section 75
agreement
required:  
No 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  No    
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i) List of all Development Plan Policy considerations taken into account in
assessment of the application. 
Argyll and Bute Local Development Plan (2015) 
LDP STRAT 1 – Sustainable Development 
LDP DM 1 – Development within the Development Management Zones 
LDP 3 – Supporting the Protection Conservation and Enhancement of our
Environment 
LDP 5 –Supporting the Sustainable Growth of our Economy 
LDP 6 – Supporting the Sustainable Growth of Renewables 
LDP 8 – Supporting the Strength of our Communities 
LDP 9 – Development Setting, Layout and Design 
LDP 10 – Maximising our Resources and Reducing our Consumption 
LDP 11 – Improving our Connectivity and Infrastructure
Page 103

Page 104

Supplementary Guidance to the Argyll and Bute Local Plan 2015 & 2016 
SG LDP ENV 1 – Impact on Habitats, Species and our Biodiversity
SG LDP ENV 6 – Impact on Trees / Woodland
SG LDP ENV 7 – Water Quality and the Environment
SG LDP ENV 10 – Geodiversity
SG LDP ENV 11 – Protection of Soil and Peat Resources
SG LDP ENV 13 -- Development Impact on Areas of Panoramic Quality (APQs)
SG LDP ENV 14 – Landscape
SG LDP ENV 19 – Impact on Scheduled Ancient Monuments (SAMs)
SG LDP ENV 20 – Impact on Sites of Archaeological Importance
SG LDP BAD 1 – Bad Neighbour Development
SG LDP Sustainable – Sustainable Siting and Design Principles
SG LDP SERV 1 – Private Sewage Treatment Plants & Wastewater Systems
SG LDP SERV 2 – Incorporation of Natural Features / SuDS
SG LDP SERV 3 – Drainage Impact Assessment
SG LDP SERV 6 – Private Water Supplies and Water Conservation
SG LDP SERV 7 – Flooding and Land Erosion – Risk Framework
SG LDP TRAN 1 – Access to the Outdoors
SG LDP TRAN 4 – New & Existing, Public Roads & Private Access Regimes
SG LDP TRAN 6 – Vehicle Parking Provision
Supplementary Guidance 2 (December 2016) 
Note: The above supplementary guidance has been approved by the Scottish
Government. It therefore constitutes adopted policy and the Full Policies are
available to view on the Council’s Web Site at www.argyll-bute.gov.uk 
(ii) List of all other material planning considerations taken into account in the
assessment of the application, having due regard to Annex A of Circular
3/2013. 
 National Planning Policy Framework 4, Scottish Government (Draft NPF4 to be
enacted on 13.2.23)
 Planning Advice Notes & Web-based Renewables Guidance
 Renewable energy and climate change framework
 Climate Change (Emissions Reduction Targets) (Scotland) Act 2019
 The Future of Energy in Scotland: Scottish Energy Strategy, Scottish Government
(December 2017)  and position Update dated 16.3.21 
 Scotland’s Draft Energy Strategy and Just Transition Plan: Ministerial statement 
(Dated 10.1.23)
 The Scottish Government’s Policy on ‘Control of Woodland Removal’ (Forestry
Commission Scotland 2009) 
 Views of statutory and other consultees;
 Planning history of the site
 Legitimate public concern or support expressed on relevant planning matters 
Argyll and Bute proposed Local Development Plan 2 (November 2019) 
The unchallenged policies and proposals within pLDP2 may be afforded significant
material weighting in the determination of planning applications at this time as the
settled and unopposed view of the Council. Elements of the pLDP2 which have
been identified as being subject to unresolved objections still require to be subject
of Examination by a Scottish Government appointed Reporter and cannot be
Page 104

Page 105

afforded significant material weighting at this time. The provisions of pLDP2 that
may be afforded significant weighting in the determination of this application are
listed below: 
 Policy 14 – Bad Neighbour Development
 Policy 35 – Design of New and Existing, Public Roads and Private Access
Regimes
 Policy 36 – New Private Accesses
 Policy 37 – Development Utilising an Existing Private Access or Existing Private
Road
 Policy 38 – Construction Standards for Public Roads
 Policy 39 – Construction Standards for Private Access
 Policy 58 – Private Water Supplies and Water Conservation
 Policy 63 – Waste Related Development and Waste Management
 Policy 78 – Woodland Removal
Scottish Government Planning Policy and Guidance 
National Planning Framework 4, which will come into force on 13th February 2023, will
supersede Scottish Planning Policy and form part of the Development Plan. NPF4
comprises 4 parts: 
 Part 1 – sets out an overarching spatial strategy for Scotland in the future. This
includes priorities, spatial principles and action areas.
 Part 2- sets out proposed national developments that support the spatial strategy.
 Part 3- sets out policies for the development and use of land that are to be applied
in the preparation of local development plans; local place plans; masterplans and
briefs; and for determining the range of planning consents. It is clear that this part
of the document should be taken as a whole, and all relevant polices should be
applied to each application.
 Part 4- provides an outline on how Scottish Government will implement the
strategy set out in the document. 
The Spatial Strategy sets out that we must embrace and deliver radical change so we
can tackle and adapt to climate change, restore biodiversity loss, improve health and
wellbeing, building a wellbeing economy, and create great places. It makes it clear
that new development and infrastructure will be required to meet the net zero targets
by 2045. To facilitate this, it sets out that we must rebalance our planning system so
that climate change and nature recovery are the primary guiding principles in all our
decisions. It sets out that significant weight should be given to the global climate
emergency when considering development proposals. The document sets out that the
planning system should support all forms of renewable development in principle.
Specific to this proposal, it also defines ‘Strategic Renewable Electricity Generation
and Transmission Infrastructure’ as National Development which includes new and/or
upgraded infrastructure directly supporting high voltage 132kV or more electricity lines
and substations. It explains that the electricity transmission grid will need substantial
reinforcement including the addition of new infrastructure to connect and transmit the
output from new on and offshore capacity to consumers in Scotland, the rest of the
UK and beyond. It sets out a series of emerging policies which building upon existing
provisions of Scottish Planning Policy. Specific policies of relevance to this application
are: 
Policy 1- Tackling the Climate Nature Crisis
Policy 2- Climate Mitigation and Adaption
Page 105

Page 106

Policy 3- Biodiversity
Policy 4- Natural Places
Policy 5 – Soils
Policy 6- Forestry, Woodland and Trees
Policy 7- Historic Assets and Places
Policy 11- Energy
Policy 14- Design, quality and Place
Policy 18- Infrastructure First
Policy 22- Flood Risk and Water Management
Policy 23- Health and Safety
Policy 25- Community Wealth Building 
Energy Policy Framework 
Statutory and policy requirements at UK and Scottish level to mitigate climate change
and increase renewable energy generation are informed by higher level international
agreements, primarily the Paris Agreement (2015) which commits United Nations
signatory countries to take action to cut carbon emissions and emphasises the aim of
restricting temperature rises to below 2°C above preindustrial levels. At the UK level,
action to tackle climate change is underpinned by the Climate Change Act 2008 as
amended by the Climate Change Act 2008 (2050 Target Amendment) Order 2019. A
range of policy documents set out the UK Governments binding commitments to cut
carbon emissions through the deployment of renewable energy, including the UK
Government’s Ten Point Plan for a Green Industrial Revolution (2020), Energy White
Paper (2020), Carbon Plan (2011), the UK Renewable Energy Roadmap (2011)
(updated 2012 and 2013) and the British Energy Security Strategy. 
More recently the publication of Scotland’s Draft Energy Strategy and Just Transition
Plan and the accompanying Ministerial statement (Dated 10.1.23) further reinforces
the importance of achieving net zero and addressing the Climate Emergency. 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  No    
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  Yes 
(M) Has a sustainability check list been submitted:  No 
(N) Does the Council have an interest in the site:  No 
(O) Requirement for a hearing: The opportunity to attend a pre-determination hearing
is required to be offered in relation to applications for planning permission for major
developments which are significant departures from the development plan and for all
national developments. Their purpose is to allow the views of applicants and those who
have made representations to be heard before a planning decision is taken. The planning
authority has discretion over how hearings will operate in its area. Subject to no requests
for a pre-determination Hearing being received from the application or consultee by 14th
February 2023 a Hearing will not be required.
Page 106

Page 107

(P) Assessment and summary of determining issues and material considerations 
This application is for the erection of an electrical substation. The proposed
substation is required in order to connect the existing 132kV OHL network between
Taynuilt to Inveraray to the proposed 13.3km double circuit Creag Dhubh to
Dalmally 
275kV Connection (the proposed OHL). This OHL will then in turn connect to the
existing SPEN 275kV OHL running between Dalmally and Inverarnan, in order to
allow connection for renewable generation in the area across the wider GB
electricity network. 
The Proposed Development consists of the substation buildings and electrical
infrastructure, and associated works required to accommodate construction,
landscaping and access. The development footprint for the proposed substation site
once completed includes the substation platforms, cut/fill embankments, access
road, associated culverts, Sustainable Urban Drainage System (SUDS) and solar
panels. 
It is considered that the proposal would accord fully with the policies of the
development plan and there are no material consideration which would indicate
otherwise. 
Taking account of the above, it is recommended that planning permission be
approved subject to conditions. A full report is included in the appendix of this report. 
(Q) Is the proposal consistent with the Development Plan: Yes   
(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Granted: 
The Scottish Government and the Council each have policies in support of projects
which increase the capacity of the grid network to serve the community and in
particular the significant level of investment in renewable energy. NPF4 justifies the
need for such investment highlighting such development as of national importance. 
Argyll and Bute has been successful in attracting inward investment in renewables,
enabled in part by a significant level of investment in the improvement of the
electricity transmission network. This success has led to the area having a good
understanding of this type of project and this Council having appropriate policies
and guidance to assist in its assessment, and to effectively manage their
implementation on the ground. For example, the use of Construction and
Environmental Management Plans “CEMP”, a particular approach to assist with the
implementation / management of such large-scale projects with a focus on
environmental protection. There are investment benefits too that favour these
projects, not just from the short term construction but a continued stream of
investment assisting with apprenticeships schemes and partnership networks with
local companies. 
Page 107

Page 108

Statutory and other consultees responding to this application are generally
supportive. Some have requested planning conditions to be attached to any grant
of planning permission to effectively ensure that their specific interests are secured. 
There are clear impacts that might be expected from this development, particularly
during its construction. These can be managed through best practice construction
management techniques to ensure surrounding interests, particularly road access
and the amenity of local housing is safeguarded from the key impacts of the
development; by planning conditions to strengthen and clarify the plans and
supporting environmental information provided by the applicant. The proposal will
also be overseen by an appointed Ecological Clerk of Works, with any permission
requiring regular compliance monitoring and ongoing engagement. 
Although not development under the provisions of the Town and Country Planning
(Environmental Impact Assessment) (Scotland) Regulations 2017, Officers are
satisfied that environmental effects of this development can be addressed by way
of mitigation. Officers have incorporated the requirement for a schedule of mitigation
within the conditions of this permission. Monitoring of construction and operational
compliance has been secured through Conditions attached to this permission. 
The application can be supported in the context of the Council’s Development Plan
and in particular it’s LDP Policies 6, 10 and 11 which relate to renewable energy
grid infrastructure and the underlying support for renewable energy development
which is consented in this area. All relevant matters have been taken into account
when appraising this application. It is considered that the proposal accords with the
principles and policies contained within the Development Plan and is acceptable in
terms of all other applicable material considerations. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
N/A 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland: 
No 
Author of
Report:
Steph Wade Date: 31/1/23 
Reviewing
Officer:
Sandra Davies Date: 31/1/23 
Fergus Murray
Head of Development & Economic Growth 
Page 108

Page 109

CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 22/00782/PP 
1. The development shall be implemented in accordance with the details specified on the
application form dated 13/04/2022, the Environmental Appraisal (April 2022), supporting
information and, the approved drawings listed in the table below unless the prior written
approval of the planning authority is obtained for an amendment to the approved details
under Section 64 of the Town and Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date
Received
Location
Plan
R170_3673_Fig1_1_RedlineBoundarySite_C  14/04/22
Proposed
A819 Site
Access
Design
Location
Plan
LT29_CRDH_0804_0010 B 08/08/22
Proposed
A819 Site
Access
Design
General
Arrangement
Plan
LT29_CRDH_0804-001 B 08/08/22
Proposed
A819 Site
Access
Design
Construction
Details
LT29_CRDH-0804_0013 C 22/08/22
Proposed
Substation
Electrical
Layout
LT29_CRDH_1104_0007 01 08/08/22
Proposed
Substation
Cross
Sections
LT29_CRDH_1104_0008 01 08/08/22
Proposed
Storage
Buildings-
Elevations 
LT29_CRDH_0805_0005 0C 08/08/22
Proposed
Storage
Buildings-
Floorplans
LT29_CRDH_0805_0006 0A 16/08/22
Proposed
132kV GIS 
Building
Elevations
LT29_CRDH_0805_0003 0D 08/08/22
Proposed
132kV GIS
Building
LT29_CRDH_0805_0001 01 08/08/22
Page 109

Page 110

Floor Plan
and Sections
Proposed
257kV GIS
Building
Elevations
LT29_CRDH_0805_0004 0D 08/08/22
Proposed
257kV GIS
Building
Floor Plan
and Sections
LT29_CRDH_0805_0002 01 08/08/22
Location of
septic tank,
borehole
water supply
and SUDS
R170_3673_Fig1_SepticTank_BHWS_SUDS_D  08/08/22
2.5m High
Security
Palisade
Fencing
Details
CE/34/2015 E 08/08/22
2.5m High
Security
Palisade
Fencing
CE/34/2016 E 08/08/22 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
2 No construction works shall be commenced until a Finalised Construction Environmental
Management Document (CEMD) has been submitted to and approved in writing by the
Planning Authority, in consultation with SEPA, and other appropriate consultees as
appropriate. The development shall then proceed in accordance with the approved
CEMD unless otherwise agreed in writing by the Planning Authority. The CEMD shall
include: 
a) An updated Schedule of Mitigation (SM) highlighting mitigation set out within each
chapter of the Environmental Appraisal (EA), and the conditions of this consent;
b) Processes to control/ action changes from the agreed SM;
c) Construction Environment Management Plans (CEMPs) for the construction phase
covering:
i) Habitat and species protection, including ECoW details, and surveys.
ii) Landscape and Mitigation Restoration Plan
iii) Long Term woodland management and compensatory planting plan (refer to
Condition 9)
iv) Pollution prevention and control;
v) Dust management, including construction activity and vehicle movements;
vi) Construction Noise and Vibration (refer to Condition 7)
vii) Temporary Site lighting;
viii) Site Waste Management;
ix) Surface and Ground water management, including: drainage and sediment
management measures from all construction areas including access tracks,
mechanisms to ensure that construction will not take place during periods of
high flow or high rainfall; and a programme of water quality monitoring;
x) Soil Management and Peat Management (refer to Condition 8)
Page 110

Page 111

xi) Mapping of borrow pits and associated habitats identified for restoration;
xii) Habitat Management and Restoration Plan;
xiii) Emergency Response Plans;
xiv) Timetable for post construction restoration/ reinstatement of the temporary
working areas and construction compound; and
xv) Other relevant environmental management as may be relevant to the
development.
d) A statement of responsibility to ‘stop the job/activity’ if a breach or potential breach
of mitigation or legislation occurs; and
e) Methods of monitoring, auditing, reporting and the communication of environmental
management on site and with client, Planning Authority and other relevant parties. 
Reason: To ensure protection of surrounding environmental interests and general
amenity.  
3 No development shall commence until a Construction Traffic Management Plan (CTMP)
and Phased Delivery Plan have been prepared and approved in writing by the Local
Authority, in consultation with the Roads Authority, and Transport Scotland as the trunk
roads Authority. The Plan shall details approved access routes, agreed operational
practises (including avoidance of convoy movements, specifying conduct in use of
passing places, identification of turning areas, information of wheel cleansing facilities,
signage to be installed on the A819 warning of construction traffic. reporting of verge
damage) and shall provide for the provision of an appropriate Code of Practice to drivers
of construction and delivery vehicles.  The development shall be implemented in
accordance with the duly approved Traffic Management Plan. 
Reason: To minimise interference with the safety and free flow of the traffic on the trunk
road, to ensure the safety of pedestrians and cycle users using the trunk road and
adjacent facilities and to be consistent with current guidance and best practice. 
4 No development or ground breaking works shall commence until a programme of
archaeological works in accordance with a written scheme of investigation, has been
submitted to and approved in writing by the Planning Authority in consultation with the
West of Scotland Archaeology Service. 
The scheme shall be prepared by a suitably qualified person and shall provide for the
recording, recovery and reporting of items of interest or finds within the application site. 
Thereafter the development shall be implemented in accordance with the duly approved
details with the suitably qualified person being afforded access at all reasonable times
during ground disturbance works. 
Reason: In order to protect archaeological resources. 
5. Prior to the commencement of development, a strategy for housing incoming
construction workers shall be submitted to and approved in writing by the Planning
Authority.  Thereafter the development shall be carried out in accordance with the
approved details. 
Reason: In order to ensure that any potential adverse impacts on the functioning of the
local housing market and tourist accommodation to the detriment of the interests of the
local community are identified and mitigated in accordance with the requirements of
NPF4, and in particular Policy 11C and Policy 25 Objectives. 
Page 111

Page 112

6 No development shall commence until an appraisal of the wholesomeness and
sufficiency of the intended private water supply and the system required to serve the
development has been submitted to and approved by the Planning Authority. 
The appraisal shall be carried out by a qualified hydrologist/ hydrogeologist or other
suitably competent person and shall include a risk assessment having regard to the
requirements of Schedule 4 of the Private Water Supplies (Scotland) Regulations 2006
or Part 3 of the Water Intended for Human Consumption (Private Supplies) (Scotland)
Regulations 2017 (as appropriate) which shall inform the design of the system by which
a wholesome and sufficient water supply shall be provided and maintained. The appraisal
shall also demonstrate that the wholesomeness and sufficiency of any other supply in
the vicinity of the development, or any other person utilising the same source or supply,
shall not be compromised by the proposed development. 
The development shall not be brought into use or occupied until the required water supply
system has been installed in accordance with the agreed specification and is operational. 
Reason: In the interests of public health and in order to ensure that an adequate private
water supply in terms of both wholesomeness and sufficiency can be provided to meet
the requirements of the proposed development and without compromising the interests
of other users of the same or nearby private water supplies. 
7 No development shall commence until a Construction Noise Management Plan (CNMP)
which demonstrates how the developer will ensure the best practicable measures are
implemented in order to reduce the impact of construction noise and vibration, is
submitted to and approved in writing by the Planning Authority. The CNMP shall include,
but is not limited to, the following:
a) A description of the most significant noise sources in terms of equipment; processes
or phases of construction;
b) The proposed operating hours and the estimated duration of the works for each
phase;
c) A detailed plan showing the location of noise and vibration sources and noise
sensitive receptors; and
d) A description of noise mitigation methods that will be put in place including the
proposals for community liaison. The best practice found in BS5228 Code of practice
for noise and vibration control on construction and open sites should be followed.
Any divergence requires to be justified.
Thereafter the development shall progress in accordance with the approved CNMP with
all approved mitigation measures to be in place prior to the commencement of
development, or as otherwise agreed in writing by the Planning Authority. 
Reason: In the interest of safeguarding residential amenity. 
8 No development shall commence until a finalised Peat Management Plan (PMP) has
been submitted to and agreed in writing by the Planning Authority, in consultation with
SEPA. The finalised version shall outline the further measures proposed to reduce peat
disturbance, recalculate the volumes of peat to be disturbed and indicate the finalised
measures for peatland restoration. Thereafter the development shall progress in
accordance with the approved PMP. 
Reason: In order to minimise disturbance of peat and ensure the appropriate reuse and
management of peat. 
9 No development shall commence until a detailed Compensatory Planting Plan (CPP) and
Long Term Forestry Management Plan (LTFMP) are submitted to and approved in writing
Page 112

Page 113

by the Planning Authority, in consultation with Scottish Forestry. The approved CPP and
LTFMP shall be implemented in full and in accordance with the approved timing, unless
otherwise agreed in writing by the Planning Authority. 
Reason: To enable appropriate woodland removal to proceed, without incurring a net
loss in woodland related public benefit, in accordance with the Scottish Government's
policy on the Control of Woodland Removal. 
10 The development shall not become operational until vehicle wheel cleansing facilities
have been installed and brought into operation on the site, the design and siting of which
shall be subject to the prior approval of the Local Authority, in consultation with Transport
Scotland as the trunk roads authority. 
Reason: To ensure that material from the site is not deposited on the trunk road to the
detriment of road safety. 
11 Notwithstanding the provisions of Condition 1, the finished ground floor levels of the
buildings of the development shall be elevated to 0.3m above surrounding ground level
unless otherwise agreed in writing by the Planning Authority. 
Reason: In order to ensure appropriate mitigation for flood risk and to ensure an
acceptable relationship between the development and its surroundings 
12 Watercourse crossings, hereby permitted, shall be designed to at least the capacity of
the existing channel and to the 1 in 200 year plus climate change flow and an allowance
for freeboard, unless otherwise agreed in writing by the Planning Authority. This includes
the replacement of the existing River Array watercourse crossing with a new oversized
box culvert, or bottomless traditional style bridge to accommodate the 1 in 200 year flood
event without constriction. 
Reason: To ensure that new watercourse crossings do not affect the existing flows in the
interests of flood risk. 
13 The development shall not include for the provision of walls, fences or hedges within 2.0
metres of the carriageway of the public road, and any gates shall open inwards, away
from the public road. 
Reason: In the interest of road safety. 
14 Notwithstanding the provisions of Condition 1, the proposed access shall be formed in
accordance with the Operational Services Drawing No SD08/001a; and visibility splays
of 160 metres x 2.4 metres shall be cleared of all obstructions such that nothing shall
disrupt visibility from a point 1.05 metres above the access at point X to a point 0.6 metres
above the public road carriageway at point Y. The final wearing surface on the access
shall be completed prior to the development first being brought into use and the visibility
splays shall be maintained clear of all obstructions thereafter. 
Reason: In the interests of road safety. 
15 No external lighting shall be installed on the site other than with the prior written approval
of the planning authority. In that event the location, type and luminance of the lighting
units to be installed shall be specified, and any duly approved lighting shall be installed
in a manner which minimises illumination and glare outwith the boundary of the
application site. The site shall not be illuminated other than in the event of staff being
present on site. 
Page 113

Page 114

Reason: In order to avoid unnecessary visual intrusion in the interests of the visual
amenity of an area otherwise unaffected by the presence of light sources. 
16 All vehicles transporting construction material to and from the proposed development
shall be sheeted. 
Reason: To ensure that material from the site is not deposited on the trunk road to the
detriment of road safety. 
17 Any blasting for the development, hereby permitted, shall not exceed vibration levels at
the nearest NSR’s of the guideline limits presented in BS 7385-2: 19937 and BS 6472-
2: 20088. 
Reason: In the interests of protecting amenity of neighbouring land use occupiers. 
NOTE TO APPLICANT 
Guidance on the submission of a request for a NMA is available online. Guidance Note
(argyll-bute.gov.uk) 
 Regard should be had to the advice to the applicant supplied by SEPA in their
consultation responses, copies of which can be viewed on the planning pages of the
Council’s Website. Please note that in respect of condition 2 above SEPA advises that
the finalised peat management and restoration proposals should adhere to their advice
as included within their part 4 of their consultation comments. 
 Regulatory requirements for private water supplies should be discussed with the
Council’s Environmental Health Officers in the first instance. 
 A Road Opening Permit under the Roads (Scotland) Act 1984 must be obtained from
the Council’s Roads Engineers prior to the formation/alteration of a junction with the
public road. 
 The access shall be constructed and drained to ensure that no surface water is
discharged onto the public road. 
Page 114

Page 115

APPENDIX A – RELATIVE TO APPLICATION NUMBER: 22/00782/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
A. Settlement Strategy 
The Development Plan comprises the adopted Argyll and Bute Local Development
Plan 2015 (LDP) and all statutory adopted supplementary guidance. 
The proposal is for the erection of a substation connecting the existing 132kV network
between Inveraray to Taynuilt and also connecting to the existing Dalmally 275kV
substation via the new overhead line which is subject of application ref.22/02305/S37.
The proposal is part of a number of infrastructure proposals to maintain “an efficient,
coordinate and economical electrical transmission system” and is required to allow
connection for renewable generation in the area across the wider electricity network.  
The preamble to Policy LDP 11 (Improving Our Connectivity and Infrastructure)
confirms that an important infrastructure related issue is renewable energy, where
Argyll and Bute’s considerable potential to contribute to national target’s is currently
constrained by insufficient grid capacity. Of relevance, is also Policy LDP 6 (Supporting
the Sustainable Growth of Renewables), which provides policy provision for renewable
energy developments within Argyll and Bute together with their enabling infrastructure.
Policy LDP 10 also provides support for developments which contribute to renewable
energy generation. 
Regarding the principle of development, the proposal falls within Policy LDP 6 and
Policy LDP 11. Policy support is offered within these two policies for improving grid
infrastructure to facilitate renewable energy generation, having regard to their level of
strategic significance in transmitting electricity from areas of generation to areas of
consumption. Such support is subject to the proposals not having an unacceptable
significant impact on the environment, local communities, historic environment,
landscape character and visual amenity. The proposal must therefore be assessed
against the other LDP policies referenced in this report. These matters are assessed
in full within a number of material planning considerations examined within this report. 
As the development would provide additional grid capacity for the transmission network
and would help to facilitate an increasing proportion of electricity generation from
renewable sources, the principle of the development receives support under policies
LDP 6 and 11 subject to site selection, design and overcoming any unacceptable
significant environmental effects. 
In terms of the Local Development Plan Settlement Strategy, the application site lies
within a combination of the ‘Countryside Zone’ and ‘Very Sensitive Countryside’
development management zones, as defined within Policy LDP DM1 of the Argyll and
Bute Local Development Plan 2015. Policy LDP DM 1 supports the development of
renewable energy related development within the ‘Very Sensitive Countryside’
development management zone, providing they are consistent with other Local
Development Plan policies. 
As a required infrastructure project to meet the demands required by renewable energy
developments within the wider area, the principle of development is considered
acceptable under the terms of policies LDP DM1- Development within the
Development Management Zones; LDP 6- Supporting the Sustainable Growth of
Page 115

Page 116

Renewables; LDP 10- Maximising our Resources and Reducing our Consumption and
LDP 11- Improving our Connectivity and Infrastructure.   
B. National Policy. 
Scotland’s Fourth National Planning Framework (NPF4), sets out the Government’s
thoughts on how best to achieve a more successful country through increasing
sustainable economic growth whilst responding to the climate emergency. It includes
plans for infrastructural investment including a high voltage electricity transmission
network deemed vital for meeting national targets for electricity generation, statutory
climate change targets and security of energy supplies. The current application falls
into the category of National Development. Whilst this establishes a need for the
project, all necessary assessments and consents are still required for such
development. Appropriate levels of mitigation would still be expected to help avoid or
reduce environmental effects. 
NPF4 states that a large and rapid increase in electricity generation from renewable
sources will be essential for Scotland to meet its net zero emissions targets. The
electricity transmission grid will need substantial reinforcement including the addition
of new infrastructure to connect and transmit the output from new on and offshore
capacity to consumers in Scotland, the rest of the UK and beyond. NPF4 emphasises
that to deliver sustainable places, Local Development Plans should maximise the
benefits of renewable energy whilst enhancing blue and green infrastructure,
decarbonising transport and building resilient connections. Resilience and a growing
green economy are stated to depend on the delivery of improved grid connections,
including high voltage grid cables.   
The lifecycle greenhouse gas emissions assessment within NPF4, concludes this
development will likely have an overall net positive impact on achieving national
greenhouse gas emissions reduction targets. 
An aim of the planning system is to create sustainable places, delivering the change
needed to adapt to the impacts of climate change whilst pushing forwards to tackle the
climate emergency. The national spatial strategy of NPF4 is that Scotland’s future
places will be net zero, nature positive places that are designed to reduce emissions
and adapt to the impacts of climate change, whilst protecting, recovering and restoring
our environment. Every decision on future developments must therefore contribute to
making Scotland a more sustainable place. The connection of approved renewable
energy projects to the grid, which would be enhanced by this project, advances its
sustainable development credentials. The expansion of the grid transmission network
in Argyll and Bute not only is a short term economic construction boost, but also a long
term infrastructural benefit to the area. A priority of the Scottish Energy Strategy (2017)
is to champion Scotland’s renewable energy potential, creating new jobs and supply
chain opportunities. 
C. Background to the Proposal. 
This application forms part of Scottish & Southern Electric Networks ‘Argyll and Kintyre
275kV Strategy’. The project looks to upgrade the original transmission network within
Argyll and Bute which was constructed over 60 years ago and designed to transmit
electricity to consumers in rural areas of low-density population, to a transmission
network which meets modern transmission demands, predominantly from renewable
generation.  Requests from renewable generation developers to connect to the
network in this area exceed current capacity of the existing transmission network,
meaning a new transmission circuit is required to meet demand from generation
Page 116

Page 117

developers and ensure security of supply. SSEN therefore look to increase the network
capability in Argyll and Kintyre to enable connection of further renewable generation
and to export to the wider GB network. The 275kV Strategy consists of 3 projects as
outlined: 
 Creag Dhubh- Dalmally 275kV Connection – This project involves establishing a
new substation (the subject of this application) and a new switching station at Glen
Lochy, connected by approximately 14km of new overhead line. 
 Creag Dhubh- Inveraray 275kV Overhead line- This project involves 8-12km of new
overhead 275kV line constructed between the proposed new substation at Creag
Dhubh and a connection point on the Inverarary to Crossaig overhead line. It will
initially be operated at 132kV, but will be capable of 275kV operation, once
associated transmission network connected substations to the south have been
upgraded to 275kV capacity. The existing 132kV overhead line between Inverarary
and the proposed new Creag Dhubh substation will be removed.
 Argyll and Kintyre 275kV substations – Existing connected substations south of
Inverarary require upgrade to 275kV capability, and as a result SSEN are
proposing a new project involving the construction and operation of a new 275kV
substation in the vicinity of the existing An Suidhe, Crarae and Crossaig
Substations, and in the vicinity of Craig Murrail, north of Lochgilphead. 
D. Location, Nature and Design of Proposed Development. 
The proposed development is located 2.5km south west of Cladich on the eastern
slopes of Cruach na Gearrchoise within the River Aray catchment. The site is located
within a large commercial conifer plantation which is in the process of being harvested.
The surrounding land is a mix of regenerating moorland, conifers and a small number
of large trees. The majority of the application site has been harvested already and
comprises small immature trees, and some mature trees along the western boundary. 
The site selection process for the substation is detailed in the Environmental Appraisal
(refer to section 4.2: Site Selection of the Report). This explains that the aim of the
process was to identify a proposed site which is technically feasible and economically
efficient, and which causes the least disturbance to the environment; and those living
in it, visiting it or using it for recreation. Of the eight sites considered, two were selected
as preferred sites, with subsequent investigations identifying the presence of
significant volumes of environmentally sensitive and technically challenging peatland
at both preferred sites. This resulted in further survey work and micro-siting to
determine the site with the least amount of peat disturbance. 
The Proposal comprises the creation of a substation platform in the region of 4.2ha to
accommodate the Gas- Insulated Switchgear (GIS). This would be created using cut
and fill to create a level platform at 209m AOD, cutting some land within the site area
from 220mAOD. One side of the substation will comprise a 275kV double busbar Gas
Insulated Switchgear (GIS), housed in the larger of two main buildings (approximately
22m x 14m x 20m) and will include connection of two 275kV overhead line bays. The
other side will consist of 132kV double busbar GIS, housed in the smaller of the two
buildings (approximately 22m x 14m x 20m) and will include four 132kV overhead line
bays and a possible grid transformer bay. Both sets of GIS will have two bays to
connect to the centrally located super grid transformers which sit between the two
buildings. The 275/132kV super grid transformers (SGT) will be rated at 480 MVA. 
The substation includes a single storey building to house the site services and control
equipment. A private bore hole is proposed to provide a private water supply to the
Page 117

Page 118

development with the requirement for toilet facilities, a shower and sink for the
maintenance staff as the converter station will not be permanently manned. 
Additional land is required for cut and fill to tie the platform into the existing ground
levels spanning a radius up to 50m from the substation. Based on the indicative cut
and fill volumes imported and exported materials for the Proposed Development are
as follows: 
 Imported material- an indicative 40,000m3 sand, gravel and rock would be required
for the substation platform and new access track. 
 Exported material- of the anticipated 33,772m3 peat/peaty topsoil anticipated to be
removed during the substation earthworks, a total of 3,525m3 is anticipated for
reused, with the remaining amount to be exported to off-site restoration areas. 
The proposal includes the erection of OHL towers, construction of an access track to
enter the site, site drainage, SUDS pond and landscaping. The proposed access track
would be 250m in length, connecting the substation to the existing private forestry
tracks approximately 20m southeast of the substation. The substation is proposed to
be enclosed by a 2.4m - 4m high security fence of palisade construction. Regarding
lighting, the proposal will use sensor-activated security for night-time access. 
The use of GIS instead of Air-Insulated switchgear is a welcomed design approach as
it is understood that GIS requires a smaller footprint than AIS, and the majority of its
electrical infrastructure is housed within a building which aids mitigation of visual and
noise impacts arising from the proposal. 
It is considered that the setting and design of the development would be sensitive to
the site and would accord with the principles set out in the Council’s Sustainable Siting
and Design Principles contained within the LDP supplementary guidance. 
E. Natural Environment. 
Policy LDP 3 requires the protection, conservation and enhancement of our
environment. Supplementary guidance policy LDP ENV1 provides additional detail in
relation to development impact on habitats, species and our biodiversity. There are no
statutory or non-statutory designated ecological sites covering the site itself. The
nearest designated site is the Glen Etive and Glen Fyne Special Protection Area (SPA)
which is located 1.4km east of the proposed development. Owing to this separation
distance, and the intervening topography and vegetation, no likely significant effects
on any of the qualifying features of this designation would arise. The SPA is designated
for its Golden Eagle population and the applicant has undertaken a Habitat Regulations
Appraisal (HRA) screening exercise. This however, also concluded that the proposal
would not give rise to any likely significant effects and there are no significant impacts
on the Conservation Objectives of Glen Etive and Glen Fyne SPA. These findings are
accepted by the Planning Authority, with no HRA Appropriate Assessment being
required. 
The applicant has submitted a range of information highlighting the presence of
protected species in and around the site. Habitats surveys identified the presence of
water vole latrines and feeding signs along the River Aray; and pine marten. No
reptiles, amphibians or trees with bat roost potential were recorded within the ecology
field survey area. Ornithological surveys have also been carried out which identify that
no disturbance impacts are predicted for golden eagles, and black grouse. The
Biodiversity Officer notes that other species have been recorded, with some outwith
the development area, such as Snipe, although no impacts are predicted on the breed.
Page 118

Page 119

It is also recognised that coniferous specialist birds are likely nesting within the footprint
of the Proposed Development. This includes, common crossbill.   
The habitats present across the site have been subject to survey. The majority of the
application site boundary comprises coniferous woodland plantation, felled coniferous
woodland, marshy grassland and continuous bracken. No invasive non-native plant or
animal species were recorded. The groundwater dependent terrestrial ecosystems
habitats recorded within the assessment area are determined to be supported by
surface water flows through the site. 
Without mitigation, the Environmental Appraisal confirms that the development has the
potential to result in habitat loss, disturbance and displacement. Ecological impacts are
to be mitigated through timing of works to avoid ecologically sensitive seasons,
employing an ECoW, and following species protection plans which feed into the
Construction Environmental Management Plan (CEMP). The assessment confirms
that following successful implementation of the mitigation, no residual effects on
important ecological features, are considered to exist and no cumulative impacts are
predicted. 
Having due regard to the above it is concluded that the proposal will not have any
adverse impacts on the natural heritage including birds and is therefore consistent with
the provisions of SG LDP ENV 1 – Development Impact on Habitats, Species and Our
Biodiversity (i.e. biological diversity); SG LDP ENV 7 – Water Quality and the
Environment; SG LDP ENV 11 – Protection of Soil and Peat Resources; SG 2
Renewable Energy; LDP STRAT 1 –Sustainable Development; LDP DM1 –
Development within the Development Management Zone; LDP 3 – Supporting the
Protection, Conservation and Enhancement of our Environment; Policy LDP 6 –
Supporting the Sustainable Growth of Renewables of the Argyll & Bute Local
Development Plan; and Policy 3- Biodiversity of NPF4. 
F. Historic Environment. 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable
Energy and NPF4 require applications for renewable energy related developments to
be assessed against any impact they may have on the historic environment, including
scheduled monuments, listed buildings and their settings. 
Six heritage assets have been identified within the Inner Study Area, including a former
footpath, a group of shieling huts, the route of a former drove road/ military road, a
former quarry, and a 20th century commemorative memorial monument. None of these
assets are classified as statutory designated sites (Scheduled Monuments, Listed
Buildings, Inventory Gardens and Designed Landscapes, Historic Battlefields, or
Conservation Areas). Although the Environmental Appraisal considers that the
potential impact on archaeological remains within the area is low to negligible due to
the area’s use as commercial forestry. However, the West of Scotland Archaeological
Service recommend that a planning condition for a programme of archaeological works
is included on any subsequent planning decision due to the area being rich in
prehistoric and medieval archaeological remains. The proposals include the routes of
two old roads, one of a possible drove road marked on OS First Edition Maps and the
other the recorded line of Wade’s Military Road. The Officer however notes the area
has been afforested and the current state of both recorded sites is unknown, thus the
requirement of the planning condition in accordance with Scottish Planning Policy. 
Having due regard to the above subject to the condition recommended by the West of
Page 119

Page 120

Scotland Archaeology Service it is concluded that the proposal will not have any
adverse impacts on the historic environment, including scheduled monuments, listed
buildings and their settings and is therefore consistent with the provisions of SG LDP
ENV 15 – Development Impact on Historic Gardens and Designed Landscapes; SG
LDP ENV 16(a) – Development Impact on Listed Buildings; SG LDP ENV 19 –
Development Impact on Scheduled Ancient Monuments; SG LDP ENV 20 –
Development Impact on Sites of Archaeological Importance; LDP 3 – Supporting the
Protection, Conservation and Enhancement of our Environment; Policy LDP 6 –
Supporting the Sustainable Growth of Renewables; and SG 2 Renewable Energy of
the Argyll & Bute Local Development Plan; and Policy 7 of NPF4.  
G. Water, Flood Risk, Drainage and Soils.   
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, Supplementary
Guidance 2: Renewable Energy and Policy 22 of NPF4 require applications for
renewable energy related development to be assessed against effects on hydrology,
the water environment and flood risk. Policy LDP 10 also requires development to
minimise the impact on the water environment and avoid areas subject to flood risk or
erosion. 
Surveys of soils and peat and all surface water features have been undertaken to
assess the potential effects of the proposed development on water quality within burns
and rivers, water abstractions (drinking water) and habitats dependent on the
groundwater at the site. 
The site sits within a water catchment area of the River Aray. The River Aray runs
along the north-eastern boundary of the site, 40m to the east of the substation and the
new access track crosses the river using an existed culverted watercourse crossing. A
tributary to the river Aray is found approximately 20m northwest of the site which runs
parallel to the site boundary flowing in a north-easterly direction. Due to the catchment
size, the fluvial flood risk is not appropriate for the River Aray and instead the surface
water flood risk map is applicable. It is noted that small areas of land across the River
Aray is shown to be at risk of flooding, however these do not affect the substation.
There are some areas of potential surface water flood risk associated with depressions
in the land causing potential ponding and two existing drains run through the middle of
the proposed substation area. The Flood Risk Advisor considers the siting of the
substation at least 30m away from the watercourse on ground at least 5m above the
watercourse is acceptable. Given the pluvial flood risk to the site, the Officer
recommends the elevation of the finished floor levels (FFLs) of buildings to 0.3m above
surrounding ground level, if practicable. The proposed development includes the
creation and improvement of new watercourse crossings for the access track to the
site. The Flood Risk Advisor recommends that new watercourse crossings are to be
designed such that post-development channel capacity is the same or greater than
pre-development channel capacity and a planning condition is recommended to ensure
adherence. SEPA also request a planning condition requiring the existing River Aray
culvert to be replaced with a new oversized box culvert, or bottomless traditional style
bridge of at least 2m in width and designed to accommodate the 1 in 200 year flood
event without constriction. 
Regarding drainage matters, the proposal will utilise a surface water drainage system
of filter drains, leading into SUDs attenuation basins on site. The Flood Risk Advisor
considers that the proposed utilisation of SUDs detention basins and drainage ditches
with water to be attenuated and restricted to 50l/s before discharge to the River Aray
is acceptable. Potable water is to be supplied to the site via the installation of a
proposed private water drinking supply. The Environmental Health Officer has
Page 120

Page 121

recommended the inclusion of a planning condition to ensure a full assessment of the
supply is undertaken to ensure it is potable, wholesome and in good quantity. 
Policy LDP 3 and SG LDP ENV 11 confirm that the Council will only support
development where appropriate measures are taken to maintain soil resources and
functions which is proportionate to the scale of development. Developments that would
potentially have a significant adverse effect on soil resources and functions or peat
structure and function in terms of disturbance, degradation or erosion would not be
supported unless it is demonstrated that such adverse effects are clearly outweighed
by social, environmental or economic benefits of community wide importance arising
from the development proposal; and a soil or peatland management plan is submitted
and demonstrates the mitigation measures to limit impact. 
The geology and soils for the application site comprise of rock debris, clayey till and
poorly to well stratified sand and gravel. The site is also underlain by peaty gleys and
is shown as Class 5 peat soil. Peat depth surveys confirmed that peat and carbon rich
soils are present on site with thicknesses ranging between 0.0m and 1.0m thickness
in the western area of the substation to 2.5m thickness in the eastern half. The proposal
will disturb approximately 35,000m3 of peat. By way of mitigation measures, SEPA
welcome that the design and siting of the development has been influenced to minimise
the impact on deep peat. A Draft Peat Management Plan has been submitted with the
application outlining the measures to mitigate potential impacts on peat and carbon
rich soils through the construction phase. The proposal looks to reuse peat to dress
the shoulders and slopes of the substation site platform and road, and also for re-
wetting/ ditch blocking in forestry areas. The peat that cannot be reused within the site
is proposed to be utilised for habitat management and restoration as part of the
adjacent Dalmally 275kV Overhead Line connection project. No risks have been
identified through the Peak Landslide Hazard Risk Assessment. SEPA are content with
the proposed peatland mitigation measures and request that a finalised Peat
Management Plan is agreed through planning condition. 
In summary, the proposed development maintains at least a 30 m set back distance
from all watercourses. In addition the proposed development has been designed to
incorporate good practice design for watercourse crossings, and all surface water
drainage will be designed to ensure that there are no adverse effects on water quality,
or the rate and volume of surface runoff. Based on the proposed design and the
standard good practice construction stage mitigation, no significant adverse effects are
predicted for the water environment.  Impacts on peat can be mitigated through
measures included within a finalised PMP, including measures to re-use peat
generated through construction of the Proposed Development. SEPA request a
condition to ensure that all works are carried out in accordance with the Schedule of
Mitigation and Construction Environmental Management Plan to mitigate against
pollution during construction and operation. 
Having due regard to the above it is concluded that effects on hydrology, the water
environment, soils and flood risk have been considered and subject to the inclusion of
the planning conditions, the proposal is therefore consistent with the provisions of SG
2 Renewable Energy, Policy LDP 6 – Supporting the Sustainable Growth of
Renewables; and Policy LDP 10- maximising our Resources and Reducing our
Consumption of the Argyll & Bute Local Development Plan; and Policy 22 of NPF4. 
H. Impact on Woodland. 
Policy 6 of NPF4 and Argyll and Bute’s Supplementary Guidance LDP ENV 6
(Development Impact on Trees/ Woodlands) confirms that developments likely to have
Page 121

Page 122

an adverse impact on trees will be resisted. Where it is demonstrated that tree removal
is required, the guidance requires planting of new woodland/ trees, including
compensatory planting and management agreements. The Scottish Government’s
Control of Woodland Removal Policy (2009) confirms that woodland removal should
be allowed only where it would achieve significant and clearly defined additional public
benefits and a proposal for compensatory planting may form part of this balance. 
A Forestry Landscape Appraisal has been submitted which assesses the felling impact
of the Proposed Development within the forest property and includes a Long Term
Forest Plan. The new development would remove existing conifer woodland of variable
age and growth rates with some spruce areas being in growth. This in turn reduces the
forestry restructuring/ planting land available within the woodland property with a total
area of 13.91ha commercial forestry land permanently lost. The long term impact of
the proposed development on future forestry operations is assessed as minimal, as a
safe tree clearance from the substation infrastructure would be established and the
operation of the development would not restrict key forestry management access
routes. 
The access track upgrade works are considered to have a beneficial impact in the form
of an upgraded section of the main forest road serving the woodland property. The
felling areas and compensatory planning areas are considered to fully mitigate the
potential impacts of woodland removal by achieving no net loss of woodland area. The
compensatory planting to be undertaken would replace the total area quantity of
woodland removed for the development. This accords with the Scottish Government’s
Control of Woodland Removal Policy, to achieve no net loss of woodland. The
compensatory planting is to occur through a combination of on-site and off-site
planting. SG LDP ENV 6 maintains a strong presumption in favour of protecting
woodland resources. The creation of the substation will however give rise to clear
public benefits as the proposal is to facilitate the long term security of energy supplies
as well as enable more renewable energy connections. Regarding existing trees
adjacent to the development area, it is confirmed within the CEMP that tree protection
measures will be installed. 
Subject to the inclusion of planning conditions to ensure that the compensatory planting
scheme is implemented together with the implementation of the Long Term Forest Plan
for the management of the remaining woodland, the proposal is considered to accord
with SG LDP ENV 6 – Development Impact on Trees /Woodland; The Scottish
Government’s Policy on ‘Control of Woodland Removal’ (Forestry Commission
Scotland 2009); and Policy 22 of NPF4. 
I. Impact on Access to the Countryside. 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, and SG 2
Renewable Energy require applications for renewable energy related developments to
be assessed against any impact they may have on public access, including impact on
long distance walking and cycling routes. 
The Council’s Access Officer confirms they have no comments to make regarding the
impact on public access rights and comment that the area is not well used for
recreational activities. Having due regard to the above it is concluded that the proposal
will not have any adverse physical impacts on public access, including impact on long
distance walking and cycling routes and those scenic routes identified in the NPF and
is therefore consistent with the provisions of SG 2 Renewable Energy, SG LDP TRAN
1 – Access to the Outdoors; LDP STRAT 1 – Sustainable Development; LDP DM1 –
Development within the Development Management Zone; LDP 3 – Supporting the
Page 122

Page 123

Protection, Conservation and Enhancement of our Environment; and Policy LDP 6 –
Supporting the Sustainable Growth of Renewables of the Argyll & Bute Local
Development Plan. 
J. Landscape and Visual Impact. 
Policy SG LDP ENV 14 in respect of Landscape and Policy LDP 3 of the adopted Argyll
and Bute Local Development Plan 2015 comprise the principal policies of relevance to
landscape and visual evaluation of the Proposed Development. The aim of this policy
is to protect, conserve and where possible enhance the built, human, and natural
environment. Policy LDP 3 also notes that a development proposal would not be
supported where adverse effects, including cumulative effects on the integrity or
special qualities of international or nationally designated sites; or, significant adverse
effects, on the special qualities or integrity of locally designated natural and built
environment sites, would occur. 
In addition, Policy LDP 9 concerns the design and setting of development, requiring
development to be sited and positioned to pay regard to the context, and be compatible
with the surroundings, particularly within sensitive locations including National Scenic
Areas, Areas of Panoramic Quality or Gardens and Designed Landscapes. 
The Environmental Appraisal considers both landscape and visual impacts of the
proposed development with photomontages provided from a range of viewpoints. The
Assessment is focused on a study area of 5km, with four illustrated viewpoints,
selected to represent typical views from within the study area, illustrating the impacts
on viewers from different directions and at different distances and elevations. It is noted
that Viewpoint 4 lies without the 5km study area, however given the extent of the Zone
of Theoretical Visibility (ZTV) coverage, it has been included as a longer distance view. 
The proposed site is located within the Craggy Upland- Argyll Landscape Character
Area. The landscape is typified by small settlements, isolated dwellings and farmstead
scattered across lower lying topography and associated with road corridors. Key
settlements include Cladich, Ardrecknish and Portsonachan. The predominant land
uses within the area are forestry and agriculture. The operational 132kV overhead line
between Taynuilt to Inveraray routes approximately 200m to the west of the application
site. 
The proposal does not affect any national landscape designations, although at regional
level the application site is within the North Argyll Area of Panoramic Quality (APQ). 
Members are requested to note that LDP2 changes the name of Areas of Panoramic
Quality (APQs) identified in the Argyll and Bute Local Development Plan (2015) to
Local Landscape Areas. However, there is no change to the boundary of the North
Argyll APQ which covers the LVIA study area defined in the application documents.
For the purposes of this report, the designation shall continue to be referred to as APQ.
The special landscape qualities of the APQ comprise the dramatic mountainous
landforms and the juxtaposition of these mountains with narrow lochs, and the sea and
with the settled loch fringes which produce a richly scenic landscape composition. The
sensitivity of the landscape designation is considered to be high. 
The proposed development is located within a largely rural landscape characterised
by an enclosed topographical valley with dense coniferous forestry, bisected by
existing grid infrastructure and forestry tracks. The form of the landscape and
prevalence of forest cover provides potential for screening/ filtering of views of the
proposed development from many of the sensitive neighbouring receptor locations.
Table 5.6 of the Environmental Appraisal considers the receptor sensitivity to range
Page 123

Page 124

between medium and high for receptors including: tourists, road users, recreational
users and walkers; landscape fabric, landscape character and the regional APQ
designation. 
Although the proposed development is situated within the North Argyll APQ, it is
extensively contained within a valley, reducing its influence on the wider APQ. The
Assessment predicts there would not be an adverse effect on the designated special
qualities or characteristics due to the varied topography which results in theoretical
visibility of the proposed development being limited. Actual visibility would be further
reduced due to the screening effects of intervening forestry and woodland as well as
the implementation of the mitigation measures outline within the Landscape and
Mitigation Plan (Figure, 3.3, Volume 3). Where visible, the assessment concludes that
the proposal would be seen from an elevated position within an expansive view that
contains a wider range of elements including the operational electricity infrastructure.
The magnitude of impact on the APQ is considered to be negligible with the integrity
of the designation remaining unaffected. 
To facilitate construction of the proposed development, a total of 16.75ha of tree felling
is required and whilst the removal would directly impact the fabric of the landscape, it
is in keeping with the commercial practices undertaken within the landscape currently
due to the commercial nature of the coniferous plantation. The impacts of the proposed
development is considered to be highly localised and largely contained within the area
immediately surrounding the application site and the expansive sense of scale of the
landscape character is considered capable of accommodating the development
without altering the defining characteristics. The assessment considers the impact on
the Craggy Upland-Argyll LCT to be low, resulting in a locally moderate residual effect,
which reduces over extending distances from the wider area. 
It is evidenced that the proposed development will result in some localised adverse
visual impacts, and that due to the overall proportions of the development, the
magnitude of change will be perceptible. It has however been evidenced from the
Environmental Appraisal that the landscape and visual effects have been carefully
considered, and despite the site selection resulting in the loss of existing commercial
forestry, the proposed implementation of the Landscape Mitigation Plan and peatland
restoration which includes: ground regrading works, landscape planting and  dressing
of shoulders and areas adjacent to the substation where possible, will result in the
successful visual integration of this development. The proposal is considered to comply
with Policy SG LDP ENV 14 in respect of Landscape and Policy LDP 3 of the adopted
Argyll and Bute Local Development Plan 2015 
K. Road Network, Parking and Associated Transport Matters. 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, and SG 2
Renewable Energy require applications for renewable energy related developments to
be assessed against any impact they may have on road traffic and adjacent trunk
roads. 
The main construction access to the proposed development will be from the A819,
which is the main route into Cladich, and the existing site access which connects to
the forestry tracks within the development area. Within Phase 1, the construction of
the access track is proposed, which comprises 108m long and 4.5m in width of track
linking the proposed substation site and the existing forestry track. The existing forestry
track is to be widened to create 4.5m width of track with wider corners and a 3m service
corridor, totalling an increased width to 7.5m. Passing places are proposed to be
created along the route. The bellmouth junction at the public road access point and the
Page 124

Page 125

upgrading of the culverted watercourse crossing of the River Aray are further enabling
works for the construction. A 215m long section of access track is also proposed to be
created around the substation site on the south east and north east aspects, outwith
the security fencing which will in future be used to facilitate access to Tower 1A as part
of the proposed Creag Dhubh to Dalmally 275kV OHL Connection Project. Parking and
vehicular turning is to be included within the substation platform. 
The Assessment demonstrates that the impact of construction HGVs on the study area
would not exceed a 30% increase on all road links, with the exception of the A819
between B840 and the Substation access point. This is estimated to be at most, 54
two-way HGV trips and 150 two-way staff car trips per day during the peak construction
phase months of months 4-6. For the remainder of the construction period (particularly
months 17-30) GGV movements are predicted to reduce to 6 to 8 two-way trips per
day. Furthermore, two abnormal loads (transformers) will be required to be transported
to the site. 
The Environmental Assessment determines that the likely construction traffic impacts
using the IEMA guidelines would be minor or negligible and non-significant for all
potential transport related effects. This is also predicted for cumulative impacts with
neighbouring developments. A Construction Traffic Management Plan (CTMP) is to be
included within the CEMP, which would include but not be limited to: the programme
of works, the agreed routes to site, details of a site Liaison Officer who would have
responsibilities for managing traffic and transport impacts and effects and would also
identify measures to manage/ reduce construction staff travel by private car,
particularly single occupancy trips. Operational traffic generation, would be minimal
with traffic generation trips for substation monitoring and maintenance work only, which
are at significantly less trip generations than that produced at construction stage. 
The Council’s Area Roads Officer and Transport Scotland have no objections to the
proposal on transport and road safety grounds. Both consultees request the inclusion
of planning construction for the agreement of a finalised CTMP, which also takes into
account the cumulative impact of the further energy works at Loch Awe. Subject to the
inclusion of the planning conditions as outlined within the Area Roads Officer and
Transport Scotland’s consultation responses, the transport related impacts of the
proposal are deemed to be acceptable and can be appropriately managed. As such,
the proposal has been found to be in accordance with the transportation policies
contained within the Development Plan, namely SG2 Renewable Energy, Policy LDP
6 – Supporting thee Sustainable Growth of Renewables; SG LDP TRAN 4 – New and
Existing, Public Roads and Private Access Regimes of the Argyll & Bute Local
Development Plan. 
L. Noise and Construction Impacts. 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable
Energy and Policy 23 of NPF4 require applications for renewable energy related
developments to be assessed against impacts on communities and individual
dwellings, including noise impacts. 
The applicant has recognised the noise nuisance that can arise from operational
substations and the need to ensure that this is limited in respect of existing noise
sensitive properties. In view of this, Chapter 10 of the Environmental Appraisal
provides a Noise Impact Assessment (NIA). There are no Noise Sensitive Receptors
(NSRs) in immediate close proximity to the application site, and therefore the
assessment has been undertaken for the nearest NSRs which range from 2km – 3.4km
from the proposed development. The survey identified a total of 4 NSRs, with all being
Page 125

Page 126

classed as high receptors due to being residential sites. The Noise assessment
concludes that construction noise at all NSRs across all construction activities fall
below all applicable noise criteria within the British Standards Institution Codes of
Practice for Noise and Vibration Control and is therefore rated as minor impact
magnitude, and construction noise is proposed to be controlled and mitigated through
the inclusion of a Construction Noise Management Plan which forms part of the
Construction Environment Management Plan. 
Regarding operational noise, the assessment concludes that the predicted noise levels
at each of the NSRs would be extremely low with modelled specific noise levels ranging
from -8.7dB(A) to 3.4 dB(A) at the NSRs. Should any blasting be required during the
construction operations, a planning condition is recommended to be included to ensure
that any blasting operations conform to the BSI Codes of Practice limits, for such an
activity. Based on the results, no specific mitigation is required for operational noise
levels of the proposal. The Council’s Environmental Health Officer has raised no
objection on the grounds of noise impacts arising from the proposal. Subject to the
inclusion of the planning conditions, the proposal is considered to comply with the
provisions of SG 2 Renewable Energy; LDP STRAT 1- Sustainable Development; LDP
DM1 – Development within the Development Management Zone; LDP 3 – Supporting
the Protection, Conservation and Enhancement of our Environment; LDP 6 -
Supporting the Sustainable Growth of Renewables; LDP 9 – Development Setting,
Layout and Design; and NPF4. 
The development of a project of this scale will have considerable temporary impacts
including for example, construction traffic but also construction noise, dust, waste etc.
Such impacts are expected intermittently through the 30 months of construction,
programmed to commence in June 2023, with the main construction works
commencing January 2024 and energisation targeted for May 2026. It is for these
reasons that the applicant has a commitment towards a project specific Construction
Environmental Management Plan approach, the finalised details of which, following
appointment of a project contractor, would require approval of the Planning Authority
in consultation with relevant consultees. In addition, the applicant has also committed
to the appointment of an Ecological Clerk of Works (ECoW) to oversee the project.
This can usually dovetail with a Planning Monitoring Officer role to monitor compliance
with the conditions attached to any consent. 
The implementation of the Construction Noise Management Plan which adopts best
practice to limit the degree and timings of such impacts especially during the proposed
construction timings of 7 days a week during day and night periods. Developers must
also comply with reasonable operational practices with regard to construction noise so
as not to cause a nuisance. Section 60 of the Control of Pollution Act 1974 sets
restrictions in terms of hours of operation, plant and equipment used and noise levels,
amongst other factors, which is enforceable via Environmental Health. 
Timing of deliveries (HGVs and abnormal loads) shall also be agreed through a
Construction Traffic Management Plan (CTMP) with construction traffic using the A819
and existing forestry site access connecting to the site. Other controls include dust
management plans, pollution prevention plans, waste management plans which would
also be expected within a project specific Construction Environmental Management
Plan. Due to the scale of the development, SEPA will control pollution prevention
measures relating to surface water run-off via a Controlled Activities Regulations
Construction Site Licence. 
M. Net Economic Impact, Including Local and Community Socio-Economic Benefits
such as Employment, Associated Business and Supply Chain Opportunities.
Page 126

Page 127

Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewables
and SPP require applications for renewable energy developments to be assessed
against net economic impact, including local and community socio-economic benefits
such as employment, associated business and supply chain opportunities. 
The development of grid infrastructure has been identified as a national priority
together within investment in renewable energy. The development of substation
projects as presented within this application are not only beneficial in strengthening the
robustness of the country’s grid network, but also result in further job and investment
opportunities through the development of associated supply chains. The development
is required to facilitate the connection of wind farms/ renewable schemes to the
national grid, which will allow the export of electricity generated to consumers. The
relationship of the development to the economic and social benefits of renewable
energy developments is therefore relevant, in a positive way. 
Argyll and Bute is experiencing significant construction activity in the transmission
network. The approval of the current application will have a short term (four years)
positive construction economic impact, although significantly less impact at the
operational stage with the design having a permanent design life. The construction of
the development is predicted to have a peak of 60 workers. Thereafter, the operation
of the facility would not require any staff permanently based onsite. 
The design, landscaping and limited visual impact of the development, means the
impacts of the development are not anticipated to have adverse impact on the local
economy, particularly tourism. Its impact, at a more local level, equally is not
anticipated to significantly impact on existing businesses or recreational interests. 
NPF4 calls for national developments to be exemplars of a Community Wealth Building
(CWB) approach to economic development. CWB is defined as “A people-centred
approach to local economic development, which redirects wealth back into the local
economy, and places control and benefits into the hands of local people”. Based on
this, it is recommended that the development should seek to agree a housing strategy
to ensure that the temporary workers associated with the proposals do not have an
unacceptable and adverse impact on the functioning of the local housing market area
to the detriment of the community and other businesses. A planning condition is
therefore recommended to secure the housing delivery programme strategy. 
Having due regard to the above the proposals net economic impact, including local
and community socio-economic benefits such as employment, associated business
and supply chain opportunities has been assessed and it is concluded that the proposal
is consistent with the provisions of Supplementary Guidance 2 (December 2016); LDP
DM1 – Development within the Development Management Zones; LDP 3 – Supporting
the Protection, Conservation and Enhancement of our Environment; LDP 6 -
Supporting the Sustainable Growth of Renewables; and NPF4. 
N. The Need For Conditions Relating To The Decommissioning Of Developments,
Including Ancillary Infrastructure, And Site Restoration (Including Cumulative
Impacts) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, and Supplementary
Guidance 2: Renewable Energy require applications for renewable energy related
developments to be assessed against the need for conditions relating to the
decommissioning of developments, including ancillary infrastructure, and site
restoration.   
Page 127

Page 128

The Proposed Development will have a design life of 50 years of more, after which the
need for re-powering or decommissioning will be considered at that time. The Proposed
Development is therefore treated as permanent in the submitted Environmental
Appraisal, and repowering and decommissioning are therefore not considered. 
On a project with this projected lifespan, where the substantive new build elements are
judged by officers not to be causing substantive harm in terms of landscape or localised
impacts, this is considered by officers to be a reasonable approach. Having due regard
to the above it is concluded that the need for conditions relating to the decommissioning
of developments, including ancillary infrastructure, and site restoration has been
considered and the proposal is therefore consistent/inconsistent with the provisions of
SG 2 Renewable Energy, Policy LDP 6 – Supporting the Sustainable Growth of
Renewables of the Argyll & Bute Local Development Plan, and NPF4.   
Page 128

Page 129

Page 129

Page 130

This page is intentionally left blank

Page 131

ARGYLL AND BUTE COUNCIL         PLANNING, PROTECTIVE SERVICES                                                                                                                  
AND LICENSING COMMITTEE 
LEGAL & REGULATORY SUPPORT                           15 FEBRUARY 2023 
SCOTTISH HYDRO ELECTRIC TRANSMISSION PLC: CONSTRUCTION OF
APPROXIMATELY 13.3 KM OF 275KV OVER HEAD LINE (OHL) FROM BETWEEN A
PROPOSED SUBSTATION AT CREAG DHUBH TO THE EXISTING SCOTTISH
POWER ENERGY NETWORKS (SPEN) 275 KV OHL THAT RUNS FROM DALMALLY
TO INVERARNAN: LAND SOUTH OF DALMALLY AND EAST OF CLADICH (REF:
22/01298/S37) 
1.0 EXECUTIVE SUMMARY  
1.1 The Committee, at its meeting on 28 September 2022, considered a report of
handling in respect of the above proposal being an application for consent to
construct and operate a 13.3 kilometre (km), 275 kilovolt (kV), double circuit
overhead line (OHL), supported by some 48 lattice steel towers between a
proposed substation at Creag Dhubh to the existing Scottish Power Energy
Networks (SPEN) 275 kV OHL that runs from Dalmally to Inverarnan, near
Succoth Glen, via a Tie-In connection. The report of handling is attached as
Appendix 1. Members agreed, on behalf of the Council, as Planning Authority, to
object to this proposal.  The matter is subject to a Public Local Inquiry (PLI).
National Planning Framework 4 (NPF4) was only available as a consultation
draft and not complete at the time this matter was considered buy members in
September 2022. It is now expected that Scottish Ministers will adopt and publish
NPF4 on 13 February 2023 meaning that it will be in force and National Planning
Framework 3 and Scottish Planning Policy will be superseded from that date and
time. Given that there is a material change in circumstances since members made
their decision in September 2022, it considered appropriate to bring this matter
back to members for their consideration. 
1.2 Recommendations 
Members are invited to: 
1.2.1 Note that NPF4 will be in force on 13 February 2023;
1.2.2 Note that this is a material change in circumstances since members made their
decision in September 2022, and it considered appropriate to bring this matter
back to members for their consideration;
Page 131 Agenda Item 8

Page 132

1.2.3 Note that it is considered the application of NPF4 in this matter, once assessed
may alter the Council’s prospects for success in the Public Local Inquiry; and
1.2.4 Request the Council’s Development Service to provide a report to the next
meeting of the committee in March 2023. 
Page 132

Page 133

ARGYLL AND BUTE COUNCIL         PLANNING, PROTECTIVE SERVICES                                                                                                                    
AND LICENSING COMMITTEE 
LEGAL & REGULATORY SUPPORT                                       15 FEBRUARY 2023 
SCOTTISH HYDRO ELECTRIC TRANSMISSION PLC: CONSTRUCTION OF
APPROXIMATELY 13.3 KM OF 275KV OVER HEAD LINE (OHL) FROM BETWEEN A
PROPOSED SUBSTATION AT CREAG DHUBH TO THE EXISTING SCOTTISH
POWER ENERGY NETWORKS (SPEN) 275 KV OHL THAT RUNS FROM DALMALLY
TO INVERARNAN: LAND SOUTH OF DALMALLY AND EAST OF CLADICH (REF:
22/01298/S37) 
2.0 INTRODUCTION 
2.1 The Committee, at its meeting on 28 September 2022 considered a report of
handling in respect of the above proposal being an application for consent to
construct and operate a 13.3 kilometre (km), 275 kilovolt (kV), double circuit
overhead line (OHL), supported by some 48 lattice steel towers between a
proposed substation at Creag Dhubh to the existing Scottish Power Energy
Networks (SPEN) 275 kV OHL that runs from Dalmally to Inverarnan, near
Succoth Glen, via a Tie-In connection. The report of handling is attached as
Appendix 1. 
3.0 RECOMMENDATIONS 
3.1.1 Note that NPF4 will be in force on 13 February 2023;
3.2.2 Note that this is a material change in circumstances since members made their
decision in September 2022, and it considered appropriate to bring this matter
back to members for their consideration;
3.2.3 Note that it is considered the application of NPF4 , once assessed, may alter the
Council’s prospects for success in the Public Local Inquiry; and
3.2.4 Request the Council’s Development Service to provide a report to the next
meeting of the committee. 
Page 133

Page 134

4.0 DETAIL 
4.1 The Committee, at its meeting on 28 September 2022 as Planning Authority, to
object to this proposal for the following reasons and that the Scottish Government
be notified accordingly and noted that this would instigate the requirement for a
Public Local Inquiry: The proposal will have adverse landscape and visual
impacts (including cumulative) within an Area of Panoramic Quality, and in
particular from the Duncan Ban Monument, and is therefore inconsistent with the
provisions of: 
LDP DM1 – Development within the Development Management Zone; 
LDP 3 – Supporting the Protection, Conservation and Enhancement of our
Environment; 
LDP 6 – Supporting the Sustainable Growth of Renewables;             
LDP 9 – Development Setting, Layout and Design; 
SG LDP ENV 13 – Development Impact on Areas of Panoramic Quality; and 
SG LDP ENV 16(a) – Development Impact on Listed Buildings; of the Argyll and
Bute Local Development Plan.
4.2 The matter is now subject to a Public Local Inquiry (PLI). National Planning
Framework 4 (NPF4) was only available as a consultation draft and not in force
at the time this matter was considered by PPSL in September 2022. It is
expected that Scottish Ministers will adopt and publish NPF4 on 13 February
2023 meaning that it will be in force and National Planning Framework 3 and
Scottish Planning Policy will be superseded from that date and time. The PLI
will then consider this matter in light of NPF4. Members were not in a position
to consider NPF4 when forming their decision and, due to this material change
in circumstances, it considered appropriate to bring this matter back to
members for their consideration
4.3 The report of handling at appendix 1 made reference to the various relevant
planning policies including the draft NPF4. At the time of the Committee’s
decision the draft NPF4 Policy had very limited weighting and could not be
afforded significant weighting. Subsequently NPF4 has been subject to
considerable revision prior to being published and laid before the Scottish
Parliament in November, 2022. It has now been approved and will be formally
adopted on 13th February, 2023 from which point it must be afforded
Development Plan status. NPF4 has the effect that all strategic development
plans and any supplementary guidance issued in connection with them cease
to have effect on the date it comes into effect. From 13 February, NPF4 will be
a part of the development plan and while little weight could previously be given
to it in its draft form, it should now be considered as a significant material
Page 134

Page 135

consideration. Legal advice on the overall position has been obtained from
Counsel and it is considered the application of NPF4 in this matter, once
assessed, may alter the Council’s prospects for success in the Public Local
Inquiry.
4.4 The principal objection made by members was is in relation to adverse
landscape and visual effects on the Area of Panoramic Quality (APQ) and in
particular from the Duncan Ban Monument. Historic Environment Scotland, as
statutory consultee, raised no objection in relation to its national heritage
interests. Its consultation response of 2 August 2022 did not refer to the Duncan
Ban Monument at all. NatureScot also raised no objection in relation to the
APQ. While that is the case, it was open to members to consider this in terms
of local considerations while noting that a draft NPF4 was in existence. That
draft was not complete and has been subject since then to substantial change.
As such it was not possible for members to fully consider matters in the light of
the now completed and adopted NPF4 which will be considered by the PLI.
5.0 CONCLUSION
5.1 The Committee, at its meeting on 28 September 2022, considered a report of
handling in respect of the above proposal. Members agreed, on behalf of the
Council, as Planning Authority, to object to this proposal.  The matter is subject to
a Public Local Inquiry (PLI). NPF4 is a material change in circumstances since
members made their decision in September 2022, and it considered appropriate
to bring this matter back to members for their consideration. 
6.0 IMPLICATIONS
6.1 Policy   -      It is for members to determine this matter in accordance with                                 
current planning policy;
6.2 Financial -   The Council will incur expenses in conducting a PLI and may in                                 
the event it is unsuccessful incur an ward of expenses against it.
6.3  Legal    -      It is considered the application of NPF4 the application of NPF4, 
once assessed, may alter the Council’s prospects for success in                               
the Public Local Inquiry                                                    
6.4  HR   -           None at present
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics – None at present 
6.5.2   Socio-economic Duty– None at present 
6.5.3  Islands – None at present
6.6 Climate Change– None at present 
6.7 Risk - In accordance with legal and financial risk above
6.8  Customer Service – None at present
Page 135

Page 136

Douglas Hendry
Executive Director with responsibility for Legal & Regulatory Support
February 2023
David Logan – Head of Legal and Regulatory Support                                                  
For further information contact: Susan Mair/Peter Bain
Email: Peter.Bain@argyll-bute.gov.uk 
Susan.Mair@argyll-bute.gov.uk 
Tel: 01546 604204
APPENDICES
Appendix 1 Report of Handling 
Page 136

Page 137

Argyll and Bute Council
Development and Economic Growth
Delegated or Committee Planning Application Report and Report of handling relating to
application for consent to the Scottish Ministers under section 37 of the Electricity Act
1989 along with a request for a direction that planning permission be deemed to be granted
under section 57 (2) of the Town and Country Planning (Scotland) Act 1997.
____________________________________________________________________________
Reference No: 22/01298/S37 (ECU000002199) 
Planning Hierarchy: Major Application (Section 37 Consultation)
Applicant: Scottish Hydro Electric Transmission Plc
Proposal: Construction of approximately13.3 km of 275 kV Over Head Line (OHL )
from between a proposed substation at Creag Dhubh to the existing
Scottish Power Energy Networks (SPEN) 275 kV OHL that runs from
Dalmally to Inverarnan.
Site Address: Land South Of Dalmally and East of Cladich
____________________________________________________________________________
DECISION ROUTE
(i) Section 37 of the Electricity Act 1989
____________________________________________________________________________
(A) THE APPLICATION
Section 37 of the Electricity Act 1989
Application for consent to construct and operate a 13.3 kilometre (km), 275 kilovolt
(kV), double circuit overhead line (OHL), supported by some 48 lattice steel towers
between a proposed substation at Creag Dhubh to the existing Scottish Power
Energy Networks (SPEN) 275 kV OHL that runs from Dalmally to Inverarnan, near
Succoth Glen, via a Tie-In connection. 
Members are requested to note that in Scotland, any proposal to install and keep
installed an overhead electric line, requires the consent of Scottish Ministers under
sections 37 of the Electricity Act 1989. Such applications are processed on behalf
of the Scottish Ministers by the Energy Consents Unit (“ECU”) Scottish
Government - Energy Consents. 
Section 57(2) of the Town and Country Planning (Scotland) Act 1997 also allows
the Scottish Ministers, on granting consent under Section 37, to direct that planning
permission for that development shall be deemed to be granted, subject to such
conditions (if any) as may be specified in the direction. 
The proposed development would primarily comprise;
• A 13.3 km double circuit 275 kV OHL, supported by lattice steel towers between
a proposed substation at Creag Dhubh to the existing SPEN 275 kV
OHL that runs from Dalmally to Inverarnan, near Glen Lochy (Succoth Glen);
(ii) Other associated works
Appendix 1
Page 137

Page 138

 Formation of new and upgraded vehicular access points to public roads
 Formation of new and upgrading of access tracks
 Construction of temporary and permanent water crossings
 Formation of tower working areas
 Other ancillary and associated operations 
An EIA has been submitted in support of the application which will be referenced in the
Officer Report. The applicants clarify in their submissions that the overall project will also
involve the following separate application submissions: 
 A Tie-In connection involving the proposed OHL being connected to the existing
Scottish Power Energy Networks (SPEN) 275 kV OHL, known as the YW route,
via a new terminal tower (T48/YW17R) located between existing SPEN Towers
YW17 and YW18, from the proposed T47.( this is subject to a separate S37
Application to the Scottish Ministers REF: ECU00004493 and consultation to
the Planning Authority REF:22/01329/S37).   
This application is subject to a separate report presented to PPSL at this meeting (REF:
22/01329/S37), however it is intrinsically linked to the current proposals as it facilitates
the connection of the proposed 13.3km high voltage line into the wider high voltage
transmission network. For clarity a separate S37 application by Scottish Power Energy
Networks (SPEN) been required as SSEN has no remit to apply for any works SPEN
infrastructure. 
The proposed Creag Dhubh substation, referenced in the submissions, and to which the
line is proposed to connect at its southern end, is the subject of a separate application
for planning permission. (Ref 22/00782/PP. Valid 19.8.22). This will be determined by
the Planning Authority and not the Scottish Ministers. 
____________________________________________________________________________ 
(B) RECOMMENDATION: 
It is recommended that no objection to the proposals be raised.
____________________________________________________________________________ 
(C) HISTORY:  Yes. 
Scoping response submitted to Energy Consents Unit under S37 process. Full details of
these procedures and submissions from all consultees are contained on the ECU website
with the Council’s Scoping response available to view under REF 21/00286/SCOPE. 
For clarity, this is a procedure to advise the ECU on matters which the Planning Authority
(and other consultees) considers should be included in the EIA submissions and not the
expression of any opinion by the Planning Authority on whether future S37 proposals
would be considered acceptable or not.
____________________________________________________________________________ 
(D) CONSULTATIONS:   
Members are requested to note that as this is a Section 37 proposal the consultation
responses are required to be sent to the Energy Consents Unit (ECU) who undertake this
exercise as the determining authority and not to the Planning Authority as this is not an
application for Planning Permission. A link to the ECU website is set out below which will
provide a reference for all submissions by third parties and other external consultees: 
Scottish Government - Energy Consents Unit - Application Details
Page 138

Page 139

Officers also take this opportunity to clarify some of the external consultees have
responded to both this and the associated single link tower S37 application by SPEN as a
single response. 
A summary of the responses sent to the ECU to the overall project by other external
consultees is set out below. 
Nature Scot (Dated 22.8.22). No Objection. 
 We note and welcome the various mitigation and compensation proposed which
will help reduce impacts on protected species and priority habitats. 
 We would welcome further discussion on the Construction Environmental
Management Plan (CEMP), mitigation, species protection plans or habitat
management plans, as appropriate, post determination. We would also be happy
to advise further on protected mammal licencing if required.   
 The proposed development would not result in significant effects on the qualities
of the Loch Etive Mountains and Ben Lui Wild Land Areas (WLA 09 and WLA 06)
and therefore would not raise issues of National Importance. 
 Glen Etive and Glen Fyne Special Protection Area (SPA) - Golden eagle
(Aquila chrysaetos), breeding 
The site’s status means that the requirements of the Conservation (Natural
Habitats, &c.) Regulations 1994 as amended (the “Habitats Regulations”)
apply. Consequently, the Scottish Government, as the competent authority is
required to consider the effect of the proposal on the SPA before it can be
consented (commonly known as Habitats Regulations Appraisal). To help you
do this we advise that, in our view, based on the information provided and our
current knowledge, the proposal will not adversely affect the integrity of the site.
The appraisal we carried out considered the impact of the proposals on the
following factors: We note that there was no flight activity very close to or
crossing the line route. However, T18-T23 approximately follows the edge of
the SPA. This leads us to a Natura appraisal conclusion of ‘likely significant
effect but no adverse effect on site integrity’. 
 We agree with the assessments made in relation to other designations in the
area and are satisfied that no significant impacts on designated sites is likely to
occur. 
Historic Environment Scotland (HES) (Dated 02.8.22) – No Objection 
This is a joint response for ECU references: ECU00002199 and ECU00004493 Sufficient
information is provided in the EIA Reports for us to come to a conclusion as to the level of
impact on heritage assets covered by our interests. Whilst the proposals will have an
adverse impact on the settings of SM4019 Auchtermally or Uachdar Mhaluidh, deserted
township and SM5149 Dychlie, deserted crofts in particular, we have concluded that the
development proposal does not raise issues of national interest sufficient to warrant an
objection for our historic environment interests. 
RSPB (Dated 22.07.22) – No Objection 
RSPB Scotland does not object to the above application, and consider that most mitigation
measures proposed in Environmental Impact assessment Report (EIAR) Volume 2,
Page 139

Page 140

Chapter 7 (to be delivered via Species Protection Plans, and monitored by the Ecological
Clark of Works (ECoW)) and the Outline Habitat Management Plan are broadly
satisfactory. However, we ask that additional mitigation is considered to further reduce the
Proposed Development’s impact on protected species and habitats, and to secure net
biodiversity gain; notably for Schedule 1/1A and A1 White-tailed eagles Haliaeetus
albicilla, UK Biodiversity Action Plan Black grouse Lyrurus tetrix and Ancient/native
woodland with associated lichen assemblages. 
SEPA (Dated 13.7.22) - No Objection. 
A condition should be applied requiring a finalised detailed Peat Management Plan (PMP),
to be agreed with the planning authority in consultation with SEPA prior to the
commencement of development. The finalised plan should be update as a result of any
further post-consent survey work and detailed design and should include further
information relating to peat disturbance and reuse from permanent tracks and proposals
for temporary peat storage. To minimise impacts on the water environment the finalised
route of the proposed access track should be amended from that shown in the application
at the following locations, which should be reflected in the finalised PMP: 
• Between T19 and T20, where the track should not run along the side of the watercourse
and a larger buffer should be observed and then a more perpendicular crossing of the
watercourse made. 
• Near T25, where the configuration of the track should be amended so that the junction
is not on top of a water feature. 
• Between T23 and T24, where the track should not run along the side of the watercourse,
a larger buffer should be observed and then a more perpendicular crossing of the
watercourse made. 
• At the spur to T20, where the track should be moved further away from the watercourse.
• Between T28 and T29, where the track should be realigned to avoid crossing the same
watercourse twice. 2. 
A condition should be applied requiring the works to be carried out in line with the Schedule
of Mitigation, outline Construction Environmental Management Plan and General
Environmental Management Plans 
A condition should be applied requiring the development and implementation of a finalised
Habitat Management Plan. It should be based on the outline version submitted with the
application and deliver at least 9.26 ha of peatland habitat restoration in the areas
identified in section 4.4 of the Outline Peat Management Plan. 4. 
A condition requiring watercourse crossings 7, 11, 17 and 18 to be of single-span bridge
design; all other permanent new or replacement crossings shall be oversized bottomless
arched culverts unless there is a small undefined channel where an oversized closed
culvert is acceptable. 
A condition should be applied requiring site reinstatement and removal of temporary
works within a given timeframe of the works being completed. 
Transport Scotland (Dated 14.7.22) - No Objection. 
Notwithstanding the issues noted, following a review of Transport Scotland’s data and
noting the assessment approach adopted, the traffic data applied is considered to be
sufficient for the purposes of this assessment 
Scottish Forestry (Dated 29.6.22) - No Objection. 
Page 140

Page 141

As with previous projects, forest design and wider felling need to be taken into account,
with similar landscape work being completed as per Inveraray Crossaig. In addition, the
hydrology of development felling in context with the normal forest activity needs to be
considered in relation to any sensitive waters, including Loch Awe. 
Specific Comments: 
1. LT29 alignment options. I am content with the description of GL5 diversion decision,
which, despite a slightly increased impact on coniferous woodland, does minimise the
effect on the Ancient Woodland. 
2. Glen Lochy Switching Station
3. Creag Dhubh Substation 
The minor alterations proposed at Glen Lochy and Creag Dhubh, do not appear to have
any additional impacts on woodlands than the previous proposals, and so I have no further
comments to make. 
Scottish Water (Dated 15.7.22) - No Objection 
A review of our records indicates that there are no Scottish Water drinking water
catchments or water abstraction sources, which are designated as Drinking Water
Protected Areas under the Water Framework Directive, in the area that may be affected
by the proposed activity. 
Internal Consultation Responses: 
Biodiversity Officer (Dated 5.8.22) - No Objection. 
“I note that the CEMP will be overseen by an ECoW, I ask that Toolbox Talks are included
along with the Habitat Management and Restoration Plans.  I also note that Pre- Start
ecological surveys are to be conducted along with mitigation for species including
ornithological interest. I look forward to having sight of the Biodiversity Net Gain
assessment report when it becomes available” 
Area Roads Engineer (Dated 23.8.22) - No objection 
I confirm that Roads have no objection to the proposed, subject to submission and
approval, of the documents listed, prior to construction/ extraction works are
undertaken. 
 A Timber Transport Management Plan (TTMP) 
 The Construction Transport Management Plan (CTMP) & control measures
therein 
Furthermore, all access roads should be constructed in accordance with the
appropriate vehicle speed/ visibility splay. All access road works undertaken should
be in accordance with Standard Construction Details 001 & 004, for access roads
adjoining adopted roads. 
Drainage and Flooding Advisor (Dated19.8.22) – No Objection. 
It is recommended that planning conditions to the effect of the following be attached to any
consent granted for this application: 
1. Watercourse crossings should be designed such that post-development channel capacity
is the same or greater than pre-development channel capacity. 
2. Surface water drainage should be designed in accordance with CIRIA C753 and ensure
that post development surface water runoff does not exceed the pre-development surface
Page 141

Page 142

water runoff. The surface water drainage should be in operation prior to the start of
construction. 
Conservation Officer (Dated 9.9.22) - No Objection. 
On the basis of the information provided the pylons will be visible from the listed McIntyre
monument and will have an adverse impact on its setting. However the proposed siting of
the pylons are at a sufficient distance from the listed monument and are set within a valley
so would not be visible on a skyline. Overall I would not consider the impact to be significant
and I would not object to the proposal. 
____________________________________________________________________________ 
(E) PUBLICITY: N/A Section 37 Consultation 
____________________________________________________________________________ 
(F) REPRESENTATIONS:  Yes 
All representations in respect of S37 Consent applications require to be submitted to the
ECU and not the Council who are only a consultee and not the determining authority.
However members are requested to note the following information from the ECU and
Council website. (A link to the ECU website has been previously provided in this report). 
At time of preparing this report Objections have been submitted to the ECU by the following
parties; 
 Sue Rawcliffe, (E-mail address) Dated 18.8.22, 08.09.22 and 9.9.22. 
Members are requested to note that this objector refers to a petition of 215
signatures which now been submitted to the ECU. This has also been provided to
Officers on 9.9.22 as there are some delays with the ECU website making
objections visible. 
It was requested by Ms Rawcliffe that this not be put on the Council public access
website for data protection reasons and the fact that it was a submission for the
ECU. Officers have agreed to this and can confirm a list of 215 individuals has
been provided objecting to the proposals on the following criteria. 
We, the undersigned wish to make representation in relation to the Section 37
applications ECU00002199 Creag Dhubh to Dalmally 275kV Overhead Line
Connection and EC00004493 North Argyll Tie-in on the following grounds:
1. The applicant, SSEN, has failed to adequately consider alternatives.
2. The applicant has failed to engage in any meaningful way with the local 
community.
3. There will be significant environmental impacts.
4. The cumulative impact of this alongside other developments will seriously 
impact on our community's future sustainability. 
A separate letter of objection has also been provided on 9.9.22 sent to the ECU 
which is also on the Councils Public Access system. It was agreed this could be 
placed on public access. 
 Mr John Strickland, Cladich More, Cladich, Dalmally Dated 21.8.22 
 Richard Field, Colluska House Dalmally
Page 142

Page 143

A link to the public representations on the ECU website is provided below to allow 
Members to view any representations received after the writing of this report. These are 
found in “Documents- Public Representations” 
Scottish Government - Energy Consents Unit - Application Details 
(i) Summary of issues raised by Objectors 
1. Failure to underground OHL not acceptable/ alternatives not considered
appropriately 
2. Impact of huge pylons unacceptable on attractive and important landscape.
Will result in industrial scale development in the landscape
3. Proposals will cause significant environmental damage.
4. The area should be a national park and is targeted as it lacks this
designation
5. Pylons widely believed to cause cancer
6. The pylons will have an adverse impact on tourism and the local economy 
In respect of the visual impact of the pylons and related matters, these are addressed
within the Officer report and in consultation responses. In respect of the other matters
raised Officers would comment as follows. 
Point 1 – The EIA Report at Chapter 2, 3.1 – 3.4.5 provides a comprehensive summary of
the design evolution and alternatives considered in reaching the current routing proposal.
Officers are content that the proposal represents an acceptable network solution when
balanced against wider Planning Policy Priorities as set out in more detail elsewhere within
this report and the routing limitations set out on the EIA. 
Point 4 - The area is, as a matter of fact, not within a designated National Park and
therefore this Statutory Designation and the tests required in respect of development
within national parks is not material to this determination. 
Point 5 - Health concerns associated with pylons is not considered by Officer to be a matter
which has any substantive materiality to the consideration of the application under
planning considerations and is a matter for Scottish Ministers and appropriate health
experts to consider whether there is any merit in these medical allegations. 
Point.6 -There is no provided or referenced evidence to support the contention that the
construction of pylons adversely impacts upon tourism within an area. 
Glenorchy and Innishail Community Council (Dated 2.8.22) – Object to proposals for
the following reasons; 
 Environmental Statement is flawed 
 The Community council accept and understand the need to upgrade the SSEN
infrastructure but SSEN have not looked sufficiently at alternative routes and
options to reduce environmental impacts contrary to LDP2 policies, Single
Outcome agreement and Community Plan. 
 Proposals will industrialise the landscape of Argyll and Bute 
 No meaningful Community Consultation has been undertaken 
 Aarhouse Convertion has not been followed by SSEN
Page 143

Page 144

This was initially submitted to the Planning Authority and not the Scottish Ministers as
should have been the case. It has however been passed on by Officers and the ECU has
acknowledged receipt and confirmed to the Community Council that its objections will be
considered by the Scottish Ministers before reaching a decision. 
All of the above objections are matters for the Scottish Ministers to consider in reaching a
decision under Section 37 of the Electricity Act 1989 and to give such weight as they
consider appropriate to all the issues raised. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Statement:  Yes. The following matters are addressed in the EIA:
• Biodiversity;
• Ornithology;
• Landscape Character and Visual Impact;
• Cultural Heritage;
• Hydrology, Hydrogeology, Geology and Soils;
• Forestry;
• Noise and Vibration; and
• Traffic and Transport;  
The EIA has also considered the potential for cumulative environmental impacts arising
as a result of the Proposed Development in-combination with other reasonably
foreseeable schemes (inter cumulative effects), as well as the combined or synergistic
effects caused by the combination of a number of effects from the Proposed Development
on a particular receptor (intra cumulative effects). This is primarily in respect of potential
Landscape Impacts and also potential cumulative traffic impacts in respect of the Roads
Network. 
The EIA report evaluates potential impacts and proposed mitigation with reference made
to a number of supporting technical appendices which provide further detail on all of the
above matters. 
(ii) An appropriate assessment under the Conservation (Natural Habitats)
Regulations 1994:  No (This is a matter for the ECU to address)
(iii) A design or design/access statement:  Refer to EIA Report and Planning
Statement
(iv) A report on the impact of the proposed development e.g. Retail impact,
transport impact, noise impact, flood risk, drainage impact etc:   
Refer to EIA Report, Technical Appendices and Figures.
Page 144

Page 145

___________________________________________________________________________ 
(H) PLANNING OBLIGATIONS 
(i) Is a Section 75 agreement required:  No 
____________________________________________________________________________ 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30, 31 or
32:  No 
____________________________________________________________________________ 
(J)  Section 25 of the Act; Development Plan and any other material considerations over
and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account in
assessment of the application. 
Argyll and Bute Local Development Plan adopted March 2015 
LDP STRAT 1 – Sustainable Development
LDP DM1 – Development within the Development Management Zones
LDP 3 – Supporting the Protection, Conservation and Enhancement of our
Environment
LDP 5 – Supporting the Sustainable Growth of Our Economy 
LDP 6 - Supporting the Sustainable Growth of Renewables
LDP 9 – Development Setting, Layout and Design
LDP 11 – Improving our Connectivity and Infrastructure 
Supplementary Guidance 
SG LDP ENV 1 – Development Impact of Habitats, Species and Our Biodiversity
(i.e. biological diversity)
SG LDP ENV 2 – Development Impact on European Sites
SG LDP ENV 4 – Development Impact on Sites of Special Scientific Interest
(SSSIs) and National Nature Reserves
SG LDP ENV 6 – Development Impact on Trees / Woodland
SG LDP ENV 11 – Protection of Soil and Peat Resources
SG LDP ENV 13 –Development Impact on Areas of Panoramic Quality (APQs)
SG LDP ENV 14 –Landscape
SG LDP ENV 16(a) – Development Impact on Listed Buildings
SG LDP ENV 19 –Development Impact on Scheduled Ancient Monuments
SG LDP ENV 20 – Development Impact on Sites of Archaeological Importance
SG LDP REN 3 – Other (Non-Wind) Forms of Renewable Energy Related
Development
SG LDP SERV 6 – Private Water Supplies and Water Conservation
SG LDP TRAN 4 – New and Existing, Public Roads and Private Access 
Regimes
SG LDP TRAN 5 – Off-Site Highway Improvements 
(ii) List of all other material planning considerations taken into account in the
assessment of the application, having due regard to Annex A of Circular
4/2009. 
 NPP3 (Draft NPP4)
Page 145

Page 146

 Argyll and Bute Energy Action Plan
 Argyll and Bute Landscape Wind Energy Capacity Study (Capacity Study
2017);
 SNH (1996) Landscape Assessment of Argyll and the Firth of Clyde
(Review No78)
 SNH (2009) Loch Lomond and The Trossachs National Park Landscape
Character Assessment.
 Argyll and Bute Woodland and Forestry Strategy 
 Scottish Government Policy Document on Control of Woodland Removal 
Argyll and Bute proposed Local Development Plan 2 (November 2019) – The
unchallenged policies and proposals within LDP2 may be afforded significant
material weighting in the determination of planning applications at this time as the
settled and unopposed view of the Council. Elements of the LDP2 which have been
identified as being subject to unresolved objections still require to be subject of
Examination by a Scottish Government appointed Reporter and cannot be afforded
significant material weighting at this time. The provisions of LDP2 that may be
afforded significant weighting in the determination of this application are listed
below: 
Policy 19 – Scheduled Monuments 
Policy 39 – Construction Standards for Private Access 
Policy 41 – Off Site Highway Improvements 
Policy 58 – Private Water Supplies and Water Conservation 
____________________________________________________________________________ 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental Impact
Assessment: No. EIA required and submitted (Schedule 1 Development)
____________________________________________________________________________ 
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  No 
____________________________________________________________________________ 
(M) Has a sustainability check list been submitted:  No 
____________________________________________________________________________ 
(N) Does the Council have an interest in the site:  No 
____________________________________________________________________________ 
(O) Requirement for a hearing (PAN41 or other):  No 
____________________________________________________________________________ 
(P) Assessment and summary of determining issues and material considerations  
The EIA submitted with the application examines landscape and other impacts associated
with the proposals and concludes that some significant landscape impact will occur, these
Page 146

Page 147

are however localised in nature and the overall development proposals will not have a
significant landscape impact and is therefore acceptable. 
It is accepted in the submission that some localised significant visual impact will occur,
and in particular from VP 11 looking south from the Duncan Ban Monument. Officers agree
with the applicant’s view that the extent and level of impact is not sufficient to raise
objection to the overall proposals as the supportive National and Local policy framework,
which are supportive of such major grid infrastructure development necessary for
renewable energy transmission and the nationally important benefits these will bring to
meeting climate change targets and in promoting sustainable development. 
Although some significant localised landscape effects will take place as identified in the
EIA, these are considered largely unavoidable with an infrastructure project of this scale.
The Council is supportive of delivering this renewable energy related infrastructure
upgrade within its Renewable Energy Action Plan under TC1 and the proposals
represent essential National Infrastructure supported in NPP3 and draft NPP4. 
Importantly, NatureScot have not raised objection on landscape, ornithology or
ecological grounds and have expressed that they are in general agreement with the EIA
evaluation and conclusions. Officers can identify no reasons to depart from the findings
and conclusions of NatureScot, and therefore consider that the overall proposals are
considered acceptable in respect of landscape, ornithology and ecological impacts. The
Council’s Biodiversity Officer also raises no objections. 
In respect of potential impacts upon cultural and historic assets, and the acknowledged
impacts within the EIA documents, HES have raised no objection to the proposals. Again
Officers can identify no reason to depart from the views of the expert consultee on such
matters. The Council’s Conservation Advisor has raised no objections to the impact of the
proposed towers on the setting of the Category B Listed Duncan Bann monument. 
Transport Scotland raises no objection to the proposals, (including evaluating potential
cumulative impacts on the Trunk Roads Network) The Area Roads manager also raises
no objections to the proposals. 
Officers consider that overall the landscape, ecological, historic environment,
Transportation and other potential effects have been appropriately addressed and
mitigated in defining the proposed route, where a balanced judgement on competing
interests must be reached. Appropriate mitigation can be secured through the imposition
of conditions by the Scottish Ministers in line with the proposals set out within the EIA, and
within the consultation responses submitted to the ECU by other consultees set out in this
Report (and on the ECU website) as is normal practice for S37 applications. 
In conclusion, it is therefore considered that the proposals are in accordance with the
overall LDP policies and objectives and it is recommended that no objection be raised to
the current S37 proposal.
____________________________________________________________________________ 
(Q) Is the proposal consistent with the Development Plan: Yes
____________________________________________________________________________ 
(R) Reasons why no objection to the proposal should be raised 
The EIA submitted with the application examines landscape and other impacts associated
with the proposals and concludes that some significant landscape impact will occur, these
are however localised in nature and the overall development proposals will not have a
significant landscape impact and is therefore acceptable.
Page 147

Page 148

It is agreed by Officers that the overall scheme is acceptable in terms of landscape impact.
In respect of the localised significant impacts identified in the EIA, it is the opinion of
Officers that these are not sufficiently harmful to justify objecting to the current proposals,
and do not outweigh the economic and sustainability benefits associated with the delivery
of this nationally important infrastructure project which will transfer renewably generated
energy to the grid. 
Although some significant localised landscape effects will take place as identified in the
EIA, these are considered largely unavoidable with an infrastructure project of this scale.
The Council is supportive of delivering this renewable energy related infrastructure
upgrade within its Renewable Energy Action Plan under TC1 and the proposals represent
important National Infrastructure supported in NPP3 and draft NPP4. 
Officers consider that overall the landscape, ecological, historic environment,
transportation and other effects have been appropriately mitigated in defining the
proposed route, where a balanced judgement on competing interests must be reached.
Appropriate mitigation can be secured through the imposition of conditions by the Scottish
Ministers in line with the proposals set out within the EIA, or within the consultation
responses submitted to the ECU by other consultees set out in this Report and on the
ECU website. 
In conclusion, it is therefore recommended that no objection be raised to the current S37
proposals 
____________________________________________________________________________ 
(S) Reasoned justification for a departure to the provisions of the Development Plan 
N/A 
____________________________________________________________________________ 
(T) Need for notification to Scottish Ministers or Historic Scotland:  S37 Consultation 
Author of Report: David Moore      Date:  12.9.22 
Reviewing Officer:  Sandra Davies      Date:  13.9.22 
Fergus Murray Head of Development and Economic Growth 
Page 148

Page 149

CONDITIONS AND REASONS RELATIVE TO S37 CONSULTATION REF. NO.22/01298/S37 
Suggested Planning Conditions 
1. The development shall be implemented in accordance with the details specified on the
submitted Section 37 Application and associated Environmental Impact Assessment
unless as otherwise agreed in writing by the Planning Authority. 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. No development shall commence unless and until the Planning Authority has approved
in writing the terms of appointment by the company of an independent and suitably
qualified environmental consultant to assist the planning authority in monitoring
compliance with the terms of the deemed permission and conditions attached to this
consent, The terms of appointment shall: 
 Impose a duty to monitor compliance with the terms of the deemed planning
permission and conditions attached to this consent
 Require the environmental consultant to submit a monthly report to the planning
authority summarising the works undertaken on site; and 
 Require the environmental consultant to report to the Planning Authority any
incidences of non-compliance with the terms of the deemed planning permission and
conditions attached to this consent at the earliest practical opportunity 
The environmental consultant shall be appointed on the approved terms throughout
the period of commencement of development to completion of post construction
restoration works. 
Reason: To enable the development to be suitably monitored to ensure compliance with
the consent issued. 
3. There shall be no transmission of electricity through the 275kV line until a woodland
planting scheme to compensate for the removal of existing woodland (“the Replanting
Scheme”) has been submitted to and approved in writing by the Scottish Ministers in
consultation with Forestry Commission Scotland and the Planning Authority. 
The Replanting Scheme submitted for approval must include; 
a. details of the location of the area to be planted;
b. details of land owners and occupiers of the land to be planted;
c. the nature, design and specification of the proposed woodland to be planted;
d. details of all Necessary Consents for the Replanting Scheme and timescales
within which each shall be obtained;
e.  the phasing and associated timescales for implementing the Replanting Scheme;
f.  proposals for the maintenance and establishment of the Replanting Scheme,
including; annual checks; replacement planting; fencing; ground preparation; and
drainage; and proposals for reporting to the Scottish Ministers on compliance with
timescales for obtaining the Necessary Consents and thereafter implementation of
the Replanting Scheme. 
The approved Replanting Scheme (or, as the case may be, an amended
Replanting Scheme as approved in accordance with paragraph 5) shall thereafter
be implemented in full and in accordance with the phasing and timescales set out
therein, unless otherwise agreed in writing by Scottish Ministers after consultation
with Forestry Commission Scotland and the Planning Authority.
Page 149

Page 150

Reason: To ensure appropriate compensatory re-planting is secured in accordance with
the requirements of SG LDP ENV 6 
4. Unless otherwise agreed in writing by the Scottish Ministers, the development will not
be commissioned to supply electricity on a commercial basis until all relevant
necessary consents for implementation of the Replanting Scheme in accordance with
the phasing and timescales set out therein have been obtained. The Company shall
submit details of any amended Replanting Scheme to the Scottish Ministers for
approval and in this case-  
(a)The development will not be commissioned to supply electricity on a commercial
basis until a Compensatory Replanting Scheme has been approved in writing by the
Scottish Ministers in consultation with Forestry Scotland and the Planning Authority; 
(b) Unless otherwise agreed in writing by the Scottish Ministers, the development will   
not be commissioned to supply electricity on a commercial basis until all necessary 
consents for the compensatory replanting scheme have been obtained. 
Reason: To ensure appropriate compensatory re-planting is secured in accordance with
the requirements of SG LDP ENV 6 
5. No development shall be commenced on site until an updated Species Protection Plan
has been submitted to and has been approved in writing by the Council as Planning
Authority in consultation with NatureScot. This shall provide for updated pre-
construction surveys to identify any presence of European Protected Species on or
adjacent to the construction site, shall detail any mitigation required in terms of the
timing of construction works and shall detail any other avoidance or mitigation
proposed in response to any protected species likely to be affected by construction
activities. The development shall be implemented in accordance with the requirements
of the duly approved Species Protection Plan. 
Reason: in the interests of nature conservation and to ensure updated surveys are
provided. 
6. No development shall be commenced until a full site specific Construction
Environmental Management Plan has been submitted to and has been approved in
writing by the Council as Planning Authority in consultation with the Scottish
Environment Protection Agency. This shall address requirements arising from the
construction and reinstatement phases of the development, shall inform the production
of construction method statements, and shall specify the siting of working areas, soil
management practices, measures to prevent pollution of watercourses, environmental
site monitoring and noise mitigation measures where identified to be required.  The
development shall be implemented in accordance with the requirements of any
approved Construction Procedures Handbook, copies of which shall be maintained
available on site for the duration of construction works. 
Reason: In the interests of pollution and noise control. 
7. For the duration of construction and dismantling works, cultural heritage assets
falling within the construction corridor, as identified within the Environmental
Appraisal, shall be temporarily fenced off from construction activities. Where such
assets are specifically protected by designation as Scheduled Ancient Monuments,
the fencing in that event shall enclose a 20 metre buffer around the extent of the
Page 150

Page 151

scheduled area. Details of such measures shall be submitted to the Planning
Authority for approval in consultation with Historic Environment Scotland. 
Reason: In order to prevent damage to the historic environment. 
8. No development shall take place within the development site as outlined in red on the
approved plan until the developer has secured the implementation of a programme of
archaeological works in accordance with a written scheme of investigation which has
been submitted by the applicant, agreed by the West of Scotland Archaeology Service,
and approved by the Planning Authority. Thereafter the developer shall ensure that
the programme of archaeological works is fully implemented and that all recording and
recovery of archaeological resources within the development site is undertaken to the
satisfaction of the Planning Authority in agreement with the West of Scotland
Archaeology Service”. 
Reason: In the interests of archaeology. 
9. Prior to development commencing, a Traffic Management Plan shall be submitted for
the written approval of the Council as Planning Authority in consultation with the
Council’s roads engineers. This shall detail approved access routes, agreed
operational practices (including avoidance of convoy movements, specifying conduct
in use of passing places, identification of turning areas, reporting of verge damage)
and shall provide for the provision of an appropriate Code of Practice to drivers of
construction and delivery vehicles. 
This Traffic Management plan shall also evaluate and include potential cumulative
impacts associated with other consented developments in the area to ensure
cumulative traffic impacts are considered and also that the use and/or sharing of borrow
pit locations to reduce traffic impacts are properly considered. Any traffic management
plan shall include the evaluation of cumulative impact analysis of consented or
reasonably foreseeable proposals which could also impact upon the capacity and
safety of the road network. This shall be subject to consideration by both the Planning
Authority and Transport Scotland The development shall thereafter be implemented in
accordance with any approved Traffic Management Plan unless with the written
agreement of the appropriate roads authority. 
Reason: In the interests of road safety and the integrity and functioning of the roads
network.   
10. Prior to development commencing details of the layout and construction of the access
points proposed to facilitate access for construction on all roads shall be agreed with
the Council’s roads engineers and Transport Scotland where the access is to a trunk
road. All construction will require to be in accordance with the Council’s standard
junction details; the required standard detail in each case being dictated by the
proposed usage of the access point. Minor accesses where the existing roadside fence
is closer to the carriageway than 2m will require a bound surface extending to a point
2m back from the carriageway edge. Where the existing roadside fence is 2m or further
from the edge of the carriageway, the bound surface shall extend to 5m back from the
edge of carriageway. All accesses will be a minimum of 3m wide. Where accesses are
proposed to be used more extensively they shall be 4.5m wide, and for the main
compounds and depots they shall be 6m wide. Accesses serving main compounds
and depots shall be constructed in accordance with roads engineers drawing
SD08/001a. All new and extended passing places will be constructed to a minimum
standard of roads engineers drawing SD08/003a, and where longer passing places
are necessary, SD08/003a will be used for extrapolation. 
Reason: In the interests of road safety. 
Page 151

Page 152

11. Details and/or compliance with the following matters/actions require to be submitted
and approved in consultation with the Area Roads Engineer prior to the
commencement of development or as otherwise may be agreed in writing with the
planning authority through an approved Traffic Management Plan; 
a. All bridges, culverts and walls along the route to be inspected and the condition
recorded before and after the project. 
b. The routes used to be inspected and the condition recorded prior to use. Video
recording is required. Survey to be submitted to Roads & Amenity Services prior to
any work starting on site. 
c. Any use of temporary signage to be approved by Roads & Amenity Services. 
d. All access points from the public road to be constructed in accordance with the
Council's standard details. The required standard detail will be relevant to the
proposed usage. 
e. All accesses to be surfaced in a bound material. 
f. Minor accesses where the roadside fence is closer to the public road than 2.00 metres
the bound surface will extend to a point 2.00 metres back from the carriageway edge.
Where the existing roadside fence is 2.00 metres or further from the edge of public
road the bound surface will extend 5.00 metres from edge of public road. 
g. All accesses will be 3.00 metres wide. Where accesses are used more extensively
they will be 5.50 metres wide and for main compounds and depots they will be 6.00
metres wide. Main compounds and depots will be constructed in accordance with
standard detail drawing ref: SD 08/001 Rev a. 
h. All new and extended passing places shall be constructed to the required standard.
The minimum required standard will be SD 08/003 Rev a. Where longer passing
places are necessary SD 08/003 Rev a will be used for extrapolation. 
i. Where it is necessary to culvert the roadside ditches the minimum pipe size will be
450 mm diameter. All roadside culverts to be agreed in writing with Roads & Amenity
Services prior to installation. All pipes to be twin wall polypropylene or similar
approved. Headwall details to be agreed with Roads & Amenity Services. 
j. A code of practice for drivers both on the site and for delivery drivers. The code of
practice will detail how drivers should proceed at passing places, how they should
allow following traffic to pass, avoid running in convoy, keep away from verges,
locations where turning is possible, report verge damage they have caused so that it
can be repaired, no parking on verges which cause obstructions; these are the
minimum contents of the code of practice, further development will be required. All
deliveries to the site will have instruction provided to the drivers relating to the Code
of Practice, specific routes to follow etc. 
k. Should any Argyll & Bute Council road suffer unacceptable damage, the Council will
consider imposing restrictions to preserve the route. 
Reason: In the interests of road safety. 
Page 152

Page 153

12. The applicant shall demonstrate that the wholesomeness and sufficiency of the
private water supplies in the vicinity of the development shall not be compromised
by the proposed development prior to the commencement of the development. 
If during, or on completion of the works, surrounding private water supplies are
effected or deemed not suitable, it shall be the responsibility of the applicant to
ensure that any damage to said water supplies is rectified and addressed to ensure
that the water supplies to the properties meet at least the standards which were in
place prior to works of this S37 consent being implemented. 
Reason: In order to provide adequate protection of the private water supplies in the
vicinity of the proposed development. 
13 Watercourse crossings should be designed such that post-development channel
capacity is the same or greater than pre-development channel capacity. 
Surface water drainage should be designed in accordance with CIRIA C753 and
ensure that post development surface water runoff does not exceed the pre-
development surface water runoff. The surface water drainage should be in
operation prior to the start of construction. 
Reason: To ensure flooding and drainage matters are properly addressed in the
implementation of the scheme. 
Page 153

Page 154

APPENDIX A – RELATIVE TO APPLICATION NUMBER: 22/01298/S37 
PLANNING LAND USE AND POLICY ASSESSMENT 
A. Settlement Strategy 
The Proposed Development forms part of this strategy and aims to reinforce the existing
transmission network connections in the Argyll region, to enable renewable energy
projects to connect to the GB transmission network and to ensure security of supply.
Infrastructure for the transportation of low carbon electricity is essential to delivering the
Scottish Government target for the equivalent of 50% of Scotland’s heat, transport, and
electricity consumption to be supplied from renewable sources. This is why enabling the
transition to a low carbon economy remains the applicant’s main strategic purpose 
The original transmission network in Argyll and Bute was constructed over 60 years ago 
and designed to transmit electricity to consumers in rural areas of low-density 
population. As the UK strives for Net Zero (achieving a balance between the greenhouse 
gases  emitted into the atmosphere and those taken out), the applicant has seen a 
significant increase in generator connection applications in Argyll and Kintyre in the last 
18 months, predominantly in renewable generation. In terms of this renewable 
generation, there are  infrastructure requirements needed to connect generators to the 
applicant’s transmission network. Officers are content that the principle of large scale 
infrastructure of this type is in accordance with Plan policy as point of principle in terms of 
scale and location of development for the reasons set out below. 
The applicants clarify in their supporting Planning Statement, at para 1.3.1 that: 
 The Proposed Development is identified within Annex A of National Planning
Framework 3 (NPF3) as a National Development under the class of development
noted as “new and / or upgraded onshore electricity transmission cabling of or in
excess of 132 kilovolts and supporting pylons”.
 The Proposed Development is for an extension to the OHL infrastructure in the
region enabling increased capacity from 132kV to 275kV and connection to the
wider SPEN network to enable renewable connections and transmission of energy
to the wider GB network.
 The Proposed Development will contribute to security of supply and provide
increased and more resilient infrastructure capacity to facilitate renewable energy
connections in the wider area – all of which forms vital elements to deliver network
and grid infrastructure required to deliver the Government’s legally binding targets
for net zero emissions and renewable energy electricity generation objectives.
 The Proposed Development will be delivered in such a way that it is
environmentally acceptable and will include a co-ordinated and scheme of
landscaping and screening to the site. 
The proposals are accepted by Officers to represent major and nationally important
infrastructure proposals as recognised in NPF3. The routing of the proposal through
countryside locations is in accordance with normal land-use associated with such
essential energy infrastructure and therefore the location of the proposals outside
settlements in countryside locations is in accordance with the objectives of LDP STRAT
1, LDP DM1 and Policy LDP 11. 
B. Location, Nature and Design of Proposed Development 
Page 154

Page 155

The proposed towers are designed to safely carry the necessary energy loadings and are
of a similar design to those used throughout the UK for such a function. The new OHL will
not only provide electricity to town and settlements in Argyll but also export electrical
energy associated with the many renewable energy generators in the area. Paragraph
2.3.4 of the Planning Statement confirms that the key components of the application re for
48 self-supporting fabricated galvanised steel lattice towers, L8(C) series that are on
average 50 m high and separated by an average distance of 280 m. The spacing (span
length) between towers and the tower height would vary depending on environment and
engineering constraints with maximum height of 60 m and maximum span length of 350. 
In respect of the design of the proposed towers, there are the approved and commonly
used towers throughout the UK to undertake high voltage transmission upgrades and
reflect those previously approved under 18/01700/S7 for the Inveraray to Crossaig high
Voltage upgrade. 
The proposals are therefore considered to comply with the general requirements of
policies LDP3 and LDP 9 in respect of their design and appearance as these are
commonly found structures throughout the UK in countryside locations. 
C. Landscape Character and Potential Impact on Settlements 
The landscape encompassing the proposed development is typified by a complex series
of irregular dramatic topographical mountains with rocky outcrops to low-lying hollows and
glens. Loch Awe is a key water feature and in the south east, the northern shores of Loch
Fyne extend partially into the study area. Areas of broadleaved woodland are present
across lower hill sides and along the shoreline of Loch Awe. Commercial forestry is a
dominant feature in the landscape and a main land use. 
 Visual receptors. Including residents of Dalmally and Cladich, which will have full or partial 
views of the OHL, individual properties, tourists, walkers and cyclists. 
 Designated landscapes: Including the Loch Lomond and the Trossachs National Park 
(LLTNP), and Areas of Panoramic Quality (APQs). 
 Non-designated landscapes: Including Wild Land Areas (WLAs) and Gardens and 
Designed Landscapes (GDLs). 
The applicant’s contend in their submission that: 
The main source of impact would be from the proposed towers and construction of new 
temporary and permanent access tracks. These require the removal of commercial 
forestry, heather moorland, and other vegetation. Careful routeing of the Proposed 
Development during the design stage mitigated these effects by endeavouring to avoid 
the most sensitive landscape and visual receptors to minimise potential significant 
landscape and visual effects. There would be direct, significant residual effects on the 
fabric and host landscape character within the immediate area of the OHL steel lattice 
towers during construction and operation. These significant effects would be highly 
localised, and the level of effect would reduce substantially over a short distance from the 
proposed development. 
Officers agree that this is fair summary of the operations proposed and the main elements
of potential landscape and visual impacts which will be associated with the towers and any
permanent access tracks retained for maintenance. 
The EIA concludes that although significant localised effects occur, the overall OHL will
not have significant environmental or landscape effects, subject to suggested mitigation
Page 155

Page 156

as set out within the EIA. However, the applicants clarify in submissions that:  Significant
adverse residual visual effects were identified at one VP location which relates directly to
Historic Environment/Cultural Heritage matters. (This is VP11 and relates to vies from and
potential impact upon the Duncan Ban Monument) 
The applicants also identify and list the following locations where visual impacts will occur
as set out in Figure 11.7 of the submissions 
 visual impact will also be significant for cars driving alongside the northern
boundary, on the B840. The wayleave will be visible to car travellers for a moderate
period of time. 
 The visual impact will be most important where the powerline crosses the A819 as
the wayleave will be directly perpendicular to the road. The sight of the wayleave
will however only be visible for a short period of time, reducing the significance of
the visual impact. 
 The A819 crosses the property from north to south and will cross the wayleave. 
 The wayleave will be visible for a moderate period of time to cars driving south,
increasing the significance of the visual impact. The power line will be visually
prominent in this rolling landscape 
 Management felling for the sub-station will be visible for cars driving north on the
A819 and for cars driving alongside the B840. 
Officers are in agreement with this overall conclusion in considering the OHL proposal in
its entirety and the most likely viewpoints where it will be most prominent in the landscape.
Clearly the power line will also be visible from surrounding high points to a greater or lesser
degree and the ZTV information provided in the EIA at Figure 8.1b. However in many of
these longer views Officers are of the opinion that the receiving landscape is of a scale
and nature to successfully absorb the impacts of the towers without significant adverse
impact occurring. The proposals are therefore considered to accord with SG LDP ENV 14 
Officers consider in respect of impact on settlements that the towers, although they will
clearly be visible from some residential properties and areas around settlements, any likely 
impacts will be acceptable. In respect of Dalmally the new towers will integrate with the
existing power lines where the proposed new line and existing line will connect. Members
should note that previous proposals to construct a switching station at this location no
longer form part of the S37 application proposals. Towers of this type and scale are not
unusual on the periphery of rural settlements where high voltage grid is required and
therefore the proposals are considered to be acceptable. 
Potential Cumulative Impacts 
Throughout the discussions associated with this, and other projects that Officers are aware
of, there has been a clear requirement for potential cumulative impacts of the proposals
to be considered as part of any evaluation. The applicants have taken this on board and
provided cumulative impact evaluation as part of the EIA submission. This evaluates not
only the potential impact of this development in isolation, but also other proposals either
existing or proposed which could cumulatively lead to the current proposals having an
unacceptable and significant impact on the landscape. 
At 8.4.75 the applicants confirm that: 
Page 156

Page 157

For the purposes of the LVIA, and in order to keep the assessment proportionate,
only those cumulative developments associated with electricity transmission, and
which are considered likely to contribute to significant cumulative effects when the
Proposed Development is introduced have been taken forward in the cumulative
assessment. 
This is accepted by Officer as a reasonable basis to evaluate potential cumulative
impacts. Table 8.7 Lists those other developments which have been considered as
part of the evaluation exercise. Cumulative impacts associated with commercial
forestry felling have also been incorporated in this exercise. 
Paragraph 8.6.39 clarifies that “The location and geographical extent of LCTs within
the Study Area are presented on Figure 8.3a (EIAR Volume 3a). A detailed
description of each of these LCTs is presented in TA 8.2 and a detailed residual
effects assessment is presented in TA 8.4 (EIAR Volume 4)” 
Detailed commentary and evaluation on such matters is contained within the EIA in
Volume 2- Chapter 8. In respect of the evaluation of these matters NatureScot, who advise
on such Landscape Impact matters, has not raised objections to the proposals in respect
of cumulative impacts. 
Officers consider that the evaluation contained within the EIA document at Vol 2 Ch 8
represents a fair evaluation of the nature of potential impacts, their potential significance
having regard to the permanent nature of the proposal, the sensitivity and characteristics
of the receiving landscape. 
Of perhaps most significance in terms of potential Landscape Impacts for A&B is the fact
that the proposals is set within an identified APQ.  The full alignment of the Proposed
Development, and the majority of the central and northern portions of the study area are
located within the North Argyll APQ. 
The applicants accept that; 
The landscape within the APQ is sparsely settled. Where settlement occurs, it is mainly
concentrated along the edges of Loch Awe and within glens, as the uplands and high tops
are relatively inaccessible, rugged and in some places relatively wild. These contrasts
between landscape types and scales are some of the characteristics that add to the scenic
quality of the area…. The sensitivity of the landscape designation is considered high as it
has a high value and a high susceptibility to the type of development proposed. 
The EIA evaluates construction effects and also potential phasing crossover. However in
Officers opinion the most important matter is the operational cumulative visual impacts of
the proposals and not the construction phase of the development where these would be
temporary. 
Chapter 2, Paragraphs 8.6.40 to 8.6.87 clarifies the LVIA evaluation which has been
undertaken by the applicants which seeks to identify those areas and interests who would
be to some degree impacted by the visual appearance of the proposals, and in
combination with other potential developments in the area. 
The applicants fairly conclude at para 8.7.3 that: 
There would be direct, significant effects on the fabric and host landscape character area
within the immediate area of the OHL steel lattice towers during construction and
operation. The removal of vegetation cover, modest changes to the landform (OHL tower
foundations) and the direct loss of coniferous forestry to facilitate the construction and
operation of the Proposed Development would alter the landscape within close proximity
Page 157

Page 158

to the proposed alignment and increase the presence of transmission infrastructure within
the landscape. Significant effects associated with these aspects of the Proposed
Development would be highly localised, and would reduce substantially over a short
distance from the alignment route. The localised removal of vegetation cover, whilst
directly impacting on the fabric of the landscape within the alignment corridor, would not
detract from, or significantly alter, the distinct pattern of landscape structure that
characterises the wider landscape. Operational effects would be mitigated through the
implementation of the mitigation specified in Section 8.5.11: Mitigation and the measures
recorded in Chapter 15: Schedule of Mitigation (EIAR Volume 2). 
Continuing at para 8.7.5; 
The Argyll and Bute Area of Panoramic Quality would be directly affected by the Proposed
Development; however, these impacts would be highly localised, quickly reducing with
distance, due to intervening forestry and woodland. The Proposed Development would be
visible from Ardanaiseig House GDL. However, given the extent of backclothing and
intervening elements such as forestry it would result in a discernible change within the
view, and is not anticipated to exert such an influence upon the qualifying features of the
GDL to the extent they would be impacted, or their enjoyment diminished. The Proposed
Development would be visible from isolated parts of the Loch Etive Mountains and Ben
Lui WLAs; however the development would not be out of character with the existing view
from these locations. Therefore, the magnitude of impact would be Negligible and the
residual effect would be Moderate/Minor and not significant. 
They continue at para 8.7.7: 
The views towards the Proposed Development from several scattered residential
properties would be seen at varying distances, and within the context of an expansive
diverse landscape. As the Proposed Development routes through dense commercial
forestry, a large proportion of the Proposed Developments towers would be screened in
views, particularly those provided from the A819 and at Cladich. From more distant
locations along the western extent of Loch Awe, properties would have long distance views
of the Proposed Development, those properties situated at lower elevations would be
subjected to filtered/restricted views. However, those properties at a higher elevation
would view the Proposed Development as a new notable element within the hillside, albeit
at a distance and backclothed by the surrounding topography and land cover. 
In respect of views the surrounding roads network para 8.7.8 states: 
The main routes (A85, A819 and B8077) and other minor transport routes were included
within the detailed assessment process. No significant residual effects were identified. Of
the many recreational routes within the LVIA Study Area, only one Duncan Ban MacIntyre
core path (C450) would be subjected to locally significant effects as a result of the
Proposed Development. Significant effects are not predicted on the amenity of any other
core path due to a combination over distance and intervening landscape features, such
as coniferous forestry and woodland vegetation and the generally backclothed
appearance of the Proposed Development.
At para 8.7.12 the applicants fairly accept that 
Any development of the scale and type proposed has potential to cause some significant
landscape and visual effects. The Proposed Development is no different in this regard.
However, it is apparent from the limited number of significant effects identified in respect
of the Proposed Development in Section 8.5.20: Residual Construction Effects and
Section 8.5.34: Residual Operational Effect, and the preceding summary, that the siting
and design of the Proposed Development has proven to be effective in minimising such
significant effects. 
Page 158

Page 159

Officers and NatureScot are in agreement with these overall conclusions in respect of
potential landscape impacts associated with the proposals and therefore although some
localised significant impacts will occur, these are not considered to outweigh the policy
support for such necessary and nationally important infrastructure development. 
D. Natural Environment (Biodiversity and Ornithology) 
The submitted EIA has considered potential impacts and their associated effects on 
ecological features (including designated nature conservation sites, habitats, and 
protected species) as well as on birds and bird related features (including sites designated 
for breeding birds and other protected bird species) in line with Chartered Institute of 
Ecology and Environmental Management (CIEEM) guidance. Baseline conditions have 
been collected through desk-based review of existing information, consultation with 
relevant statutory and non-statutory bodies and habitat and protected species surveys 
been collected through desk-based review of existing information, consultation with 
relevant statutory and non-statutory bodies and habitat and protected species surveys. 
The EIA confirms that: 
The dominant habitats are coniferous woodland plantation, wet modified bog and semi-
improved acid grassland. Potential Groundwater Dependent Terrestrial Ecosystems 
(GWDTEs) were recorded throughout the field survey area. Protected species surveys 
identified the presence of Bat Roost Potential (BRP) trees, badger meles, water  vole 
amphibius, otter Lutra lutra, pine marten Martes martes, red squirrel Sciurus 
vulgaris, common lizard Zootoca vivipara, common frog Rana temporaria, and common 
toad Bufo bufo. 
The EIA acknowledges that significant impacts will occur, but concludes that the proposed
mitigation measures proposed satisfactorily address these. The applicants state that: 
Without the application of mitigation, significant effects would likely include, felling
approximately 12.62 ha of Ancient Woodland, degradation of peatland habitats (wet heath
and flushes), removal of trees with BRP, degradation of water vole and otter habitat.
Following the application of mitigation, such as native woodland retention measures, on-
site and offsite compensatory planting, peatland restoration, habitat reinstatement, a
Construction Environmental Management Plan (CEMP), pollution prevention measures,
and inspection of BRP trees to be felled, no significant residual effects are predicted.
Following completion of the Proposed Development (including reinstatement work),
residual adverse effects are anticipated for the long term (approximately 10 to 20 years)
until woodland has re-established. Woodland planting for Ancient Woodland is not a like-
for-like replacement as Ancient Woodland is an irreplaceable resource. Compensatory
planting areas are likely to establish as functional young woodland over at least 50 years.
However, it would take far longer to provide a comparable offset for the loss of Ancient
Woodland. As a result, a long-term significant adverse residual effect would remain for the
loss of Ancient Woodland until such time as the replacement woodland areas are fully
established and functional (from 80-100 years). Significant cumulative adverse effects are
also predicted on Ancient Woodland between the surrounding cumulative developments
and the Proposed Development. 
In respect of Ornithology the submission confirms that the Glen Etive and Glen Fyne
Special Protection Area (SPA), which is designated for Golden Eagle (Aquila chrysaetos),
borders the proposed development, for approximately 1 km, between towers 18 and 23
near Achlian Farm. The closest point to the SPA is 40 m, between Towers 20 and 21. 
The EIA confirms that the proposed development runs between two golden eagle
territories, one with an active nest location to the north and another with an active nest to
Page 159

Page 160

the south east. These territories have potential connectivity with the Proposed
Development. Surveys recorded low levels of golden eagle flight activity and no significant
impacts on the species, or the SPA are predicted. Field surveys recorded black grouse
leks at five locations within the Ornithological Field Survey Area and territories were
identified of white tailed eagle and hen harrier as well as likely territories of goshawk and
honey buzzard. (Members are requested to note that detailed information in respect of
these matters has been submitted to the Council on a confidential basis to protect the nest
locations of the eagles. This is in accordance with established practice on such sensitive
information). 
In respect of Ornithology the applicants conclude in their non-technical summary that
Impacts on these features would be mitigated by adhering to Species Protection Plans
and monitoring to be undertaken by the Ecological Clerk of Works. A section of line
marking is required to avoid collision risk on white-tailed eagle. No significant residual
impacts or cumulative impacts on ornithological features are predicted. 
The Council’s Biodiversity Officer raises no objections to the proposals and comments as
follows: 
I note that no Invasive Non-Native Species have been recorded, I am aware that
Rhododendron ponticum is present in the wider area, along the main road and in some
areas of the surrounding land, I ask that applicant includes INNS in their pre-start checks
and if found create exclusion zones whilst  implementing an eradication plan.   
She continues; 
“I note that the CEMP will be overseen by an ECoW, I ask that Toolbox Talks are included
along with the Habitat Management and Restoration Plans.  I also note that Pre- Start
ecological surveys are to be conducted along with mitigation for species including
ornithological interest. I look forward to having sight of the Biodiversity Net Gain
assessment report when it becomes available” 
NatureScot have also raised no objection to the proposals with their full consultation
response available on the ECU website. 
It is considered that all ecological and biodiversity and ornithology related considerations
have been appropriately addressed within the submitted EIA and can adequately
addressed by the imposition of appropriate conditions by the Scottish Ministers on any
grant of consent 
E. Impact on Woodland 
The EIA forestry assessment has considered potential impacts and their associated 
effects on the forestry resource, forest management and forest access during 
construction and operation. 
The applicants have confirmed that a desk study has been undertaken comprised 
consultation with Scottish Forestry and landowners  and review of existing forest data 
provided by the landowners on woodland type (species/age class) and the existing 
woodland management regime. Field surveys were undertaken to confirm the extent of 
woodland areas affected by the Proposed Development and assess the current woodland 
characteristics. In total, approximately 7.92 km of the 13.3 km Proposed Development is 
within woodland and associated open ground, where tree clearance is required to 
form an Operational Corridor. 
Page 160

Page 161

The EIA submission confirms that three woodland habitat types were identified during
surveys (areas provided in brackets show the identified woodland areas e.g. areas to be
felled): 
• Broadleaved semi natural woodland (12.62 ha)
• Broadleaved plantation woodland (0.36 ha)
• Coniferous plantation woodland (51.19 ha) 
The native broadleaved woodland areas are identified on the Scottish Government’s
Ancient Woodland Inventory. The routeing and alignment process sought to avoid
woodland where possible, while taking account of other environmental, technical and cost
constraints. The Proposed Development would pass through 7.92 km of woodland, and
potentially impact on up to 64.17 ha of woodland. 
The applicants submit that; 
The loss of predominately low sensitivity coniferous woodland (51.19 ha) equates to
approximately 0.03% of the regional resource (Argyll & Bute Council area). The Proposed
Development would result in an impact on up to 12.98 ha of more sensitive ancient semi-
natural woodland, of which 12.62 ha is categorised as semi-natural woodland. In the
context of the regional resource, 12.62 ha would equate 0.04% loss. The effects of
woodland removal, in forestry terms, were assessed as not significant, due to the low
magnitude of change in the context of the regional resource, and the low to medium
sensitivity of the types of woodland present in the study area. The effect on the ancient
semi-natural woodland of mixed native broadleaves classification were assessed as
significant based on the impact of a noticeable change over a limited area. No mitigation
is deemed necessary to address the direct woodland loss in forestry terms. 
The felling of this amount of woodland with no compensatory planting would be considered
contrary to Supplementary policy LDP ENV 6 which clarifies that: 
Argyll and Bute Council will also resist development likely to have an adverse impact on
trees by ensuring through the development management process that adequate provision
is made for the preservation of and where appropriate the planting of new woodland/trees,
including compensatory planting and management agreements. 
To address these matters the applicants have confirmed that: 
…SSEN Transmission is committed to seeking to reduce the ecological effects that would
arise through the loss of ancient semi-natural woodland through the sensitive
management of the Operational Corridor. No significant effects on forest access were
identified. The development of compensatory planting scheme agreements will be
progressed with landowners within the regional land boundary of Argyll & Bute Council.
This is to mitigate the woodland removal of the Proposed Development to meet the
Scottish Government’s CoWRP objective of no net loss of woodland. On this basis the
Applicant will replant the area quantity (64.17 ha) of woodland that will be removed for the
Proposed Development. 
Scottish Forestry , in their consultation response to the ECU dated 31.8.22 have confirmed
that subject to the imposition of  appropriate conditions to ensure compensatory planting,
and the provision of Overhead Line Woodland Reports to minimise impacts on woodlands
through best practice in respect of tree removal is provided they raise no objections to the
proposals. The Council’s Biodiversity Officer has also confirmed that she has no objection
to the proposals. 
F. Historic Environment and Archaeological Matters  
Page 161

Page 162

As this is a S37 application the ECU has also consulted Historic Environment Scotland
(HES) in respect of the proposals in a similar manner to consulting the Planning Authority.
As HES are the statutory advisor in respect of such matters their views on the application
are substantive material consideration in respect of evaluating the current proposals. 
In their consultation response dated 2.8.22 found on the ECU website (Application - HES
Consultation Response - 02 August 2022 - Creag Dhubh to Dalmally.pdf) they comment
that: 
Whilst the proposals will have an adverse impact on the settings of SM4019 Auchtermally
or Uachdar Mhaluidh, deserted township and SM5149 Dychlie, deserted crofts in
particular, we have concluded that the development proposal does not raise issues of
national interest sufficient to warrant an objection for our historic environment interests 
…. Our view is that the proposals do not raise historic environment issues of national
significance and therefore we do not object. Our decision not to object should not be taken
as our support for the proposals. This application should be determined in accordance
with national and local policy on development affecting the historic environment, together
with related policy guidance 
Officers see no reason to depart from the conclusions of HES as set out in their
consultation response. 
It is clarified that from VP11 Duncan Ban McIntyre monument, the proposed development
would be visible in views to the south/ southeast. The full Title of this Category B listed
Building is Duncan Ban Mcintyre Monument Beacon Hill and the Listed building reference
is LB12167. 
Officers agree with the evaluation of the applicants advisors that the scale and proximity
of the line to views from this Category B Listed Building bring potential adverse impacts
both in views from the monument outwards to the SW in terms of landscape impacts as
this is a dominant view westward towards Loch Awe, but also, for the purposes of Cultural
Heritage evaluation, as being potentially viewed as being within the setting of the Listed
Building. HES have not referenced the potential impact on the Duncan Ban Monument in
their response and have clarified that the potential impact on the setting of a category B
Listed Building is not within their remit on such applications and is a matter for the Planning
Authority 
Although officers consider there will be some adverse impact upon the setting of the
Duncan Ban monument, this is considered not to be of such significance as to merit
recommending an objection be raised to the proposals. The Council’s Conservation
Advisor has commented that: 
On the basis of the information provided the pylons will be visible from the listed
McIntyre monument and will have an adverse impact on its setting. However the
proposed siting of the pylons are at a sufficient distance from the listed monument
and are set within a valley so would not be visible on a skyline. Overall I would not
consider the impact to be significant and I would not object to the proposal. 
In respect of archaeological matters further more detailed consideration of the actual
works required within specific locations will be necessary to ensure any requests for
Archaeological access is proportionate and reasonable to the circumstances of the
location. This will be informed by the CEMP, where details of the exact location, and
construction details of the proposals will be clarified. A standard condition can therefore
address these matters ensuring that WOSAS approve necessary investigatory works in
advance of any development commencing. 
Page 162

Page 163

G. Water Environment 
No consultees have raised objection to the proposals and SEPA, Scottish Water and the 
Council’s Flooding advisor are all content that subject to appropriate conditions and 
mitigation measures that the proposals are acceptable. It is not considered that the 
proposal raises any significant issues in respect of the water environment. 
H Potential Noise impacts on Noise Sensitive Receptors (NSR) 
It is considered that the use of appropriate noise control and mitigation measures can be
used to ensure that no unacceptable impact would occur to sensitive receptors. These
should be incorporated into the CEMP in respect of the details of construction proposals
and identified mitigation requirements as is normal practice in respect of such
development over such a long length with multiple construction sites. 
The primary concern in respect of the proposals is related to the construction phase which
represents a temporary period and therefore further discussions and agreement on these
matters will be undertaken through the CEMP and site specific construction procedures to
be approved. 
Some tower locations will be sufficiently distant from a NSR to not require specific
limitation, where others, and depending on whether rock breaking is required, may require
the imposition of more stringent limitations and specific mitigation measures. All noise
controls and mitigation measures will be included in the CEMP, including agreed hours of
construction. These controls will be determined in consultation with Environmental
Protection Officers. 
However given the scale of the proposals, the length of the new OHL, and the extensive
works to form access tracks, the Energy Consents Unit is requested to seek further input
from WOSAS before making any favourable determination of this application to ensure
Archaeological matters are properly addressed, and if considered necessary an
appropriate condition is imposed. 
I. Road Network and Associated Transport Matters. 
The Area Roads Engineer has raised no objection to the proposals subject to the 
imposition of conditions requiring the submission and approval of Traffic Assessment in 
respect of both woodland removal and also the construction phase of the project to include 
details of junction designs to ensure road safety. 
Transport Scotland have also not raised any objection to the proposals provided a detailed 
evaluation of the potential impacts of the proposals on the Trunk Road Network as set 
out below: 
OBSERVATION 9: The estimated construction trips do not exceed the applied IEMA
thresholds of a 10% increase in general traffic or a 30% increase in HGV traffic on either
the A83(T) or A85(T). It is noted that both of these thresholds are forecast to be exceeded
on the A819, however, this is regarded as a matter for consideration by the Local Authority.
OBSERVATION 10: Should the volume of construction material required to be transported
to site exceed that assessed, where this would alter assessment conclusions, the
assessment is required to be updated and outcomes issued for consideration by Transport
Scotland 
The EIAR notes that “the source of construction materials is unconfirmed at this stage”.
However, it is assumed that construction traffic (HGVs and staff) will approach the sites
from the north and south via the A85(T) and A83(T) respectively, to route onto the A819. 
Page 163

Page 164

Cumulative Impacts The EIAR includes analysis of the cumulative effects of the following
consented and proposed developments which would use the same public roads as the
Proposed Development during construction: 
• Blarghour Wind Farm (Consented) – The EIAR advises that construction of the wind
farm is anticipated to begin well ahead of construction for the Proposed Development.
Therefore, the peak traffic generating months will not coincide with those for the Proposed
Development. Consequently, any cumulative traffic impact will remain below the worst-
case scenario assessed within the EIAR. It is highlighted that a CTMP will be implemented
for the wind farm to minimise and manage effects within the study area and communication
will take place between the construction sites to minimise effects and ensure that larger
traffic generating activities…are phased to avoid overlap where practicable. 
• Meteorological Mast, Ladyfield Cottage (Consented) – The EIAR advises that the traffic
impact associated with the construction of the meteorological mast is anticipated be
negligible and the construction programme is not anticipated to overlap with the Proposed
Development. Therefore, cumulative traffic impacts are not anticipated. 
• Creag Dhubh to Inveraray 275 kV OHL (Proposed) – The EIAR advises that no details
on the predicted traffic generation for the Creag Dhubh to Inveraray OHL are available as
this is only at pre-application stage. However, it is the same Applicant as for the Proposed
Development and it is advised that the potential cumulative effects would be managed
collectively in accordance with each project’s Construction Environmental Management
Plan (CEMP) and CTMP to ensure no significant traffic and transport related effects arise. 
• Creag Dhubh 132 / 275 kV Substation (Proposed) – The EIAR advises that construction
of the Creag Dhubh Substation would be undertaken in parallel with the construction of
the Proposed Development and that there will be potential in-combination effects as a
result of increased traffic movements in the study area. The substation construction phase
will take 30 months and peak traffic generation month will occur in months 4 to 6, with 54
two-way daily HGV trips. The cumulative peak month will occur in months 1 to 3 of the
Proposed Development construction phase (months 7 to 9 of the substation construction
phase) with 111 daily two-way HGVs within the study area. Cumulative staff trips will
equate to a maximum of 300 two-way car trips per day within the study area (assuming no
car sharing). The cumulative impact of the two simultaneous developments is anticipated
to result in an increase in total traffic levels along the A85(T) and A83(T) of more than 10%
at the sensitive receptors of Dalmally and Inveraray respectively, and an increase of over
30% in HGV levels on the A83(T). Increases in total traffic and HGV traffic would also
exceed the IEMA 10% and 30% thresholds respectively on the A819 and B840. As such,
the EIAR presents a full assessment of environmental effects for the cumulative impact on
the A83(T) and A85(T), as well as the local road links. 
Severance impacts are not considered to be significant, given the layout and topography
of Dalmally and Inveraray. The study area is approximately 40km in length. Assuming a
two-way 40km trip for each of the construction vehicles during the two construction
phases, an increased accident risk of 0.67 Personal Injury Accidents per year has been
estimated. This is considered to be both minor and significant. Other effects are
considered to be negligible or minor and not significant. 
OBSERVATION 11: The estimated cumulative construction trips exceed the IEMA
thresholds of a 10% increase in general traffic on both the A83(T) and A85(T) and a 30%
increase in HGV traffic on the A83(T). From the perspective of Transport Scotland, the
results of the full assessment of effects are considered to be acceptable. 
Noting the observations set out in this response, based on the information provided,
Transport Scotland would offer no objections to Application ECU00002199, subject to the
application of the following conditions to any consent that may be awarded: 1. No
development shall commence until a Construction Traffic Management Plan (CTMP) and
Page 164

Page 165

Phased Delivery Plan have been prepared and approved in writing by the Local Authority,
in consultation with Transport Scotland as the trunk roads authority. - Reason: To minimise
interference with the safety and free flow of the traffic on the trunk road, to ensure the
safety of pedestrians and cycle users using the trunk road and adjacent facilities, and to
be consistent with current guidance and best practice. 2. All vehicles transporting
construction material to and from the proposed development shall be sheeted. - Reason:
To ensure that material from the site is not deposited on the trunk road to the detriment of
road safety. 3. The development shall not become operational until vehicle wheel
cleansing facilities have been installed and brought into operation on the site, the design
and siting of which shall be subject to the prior approval of the Local Authority, in
consultation with Transport Scotland as the trunk roads authority. - Reason: To ensure
that material from the site is not deposited on the trunk road to the detriment of road safety.
4. Prior to any decommissioning of the development, a Decommissioning Plan shall be
prepared and approved in writing by the Local Authority, in consultation with Transport
Scotland as the trunk roads authority. - Reason: To minimise interference with the safety
and free flow of the traffic on the trunk road.  
As there are a number of other developments which could potentially be granted
permission in addition to those listed in the cumulative assessment (i.e. Cruachan 2 - S36)
Officers are aware that potential cumulative impact upon the road network is an important
issue. Officers therefore consider that in granting any permissions for further major
infrastructure development in the Dalmally/Inveraray/Crossaig areas there is a need to
understand potential roads impacts and the potential construction stage overlap which
could place demand on the roads network. A condition requiring the submission of an 
updated cumulative impact assessment as part of any Transportation Assessment
submission is required and a condition to this effect has been proposed. 
Members are requested to note for their general information that Roads and Planning
Officers are currently commencing discussions on this matte with SSEN, and also with
Transport Scotland and the Energy Consents Unit to ensure that co-ordinated
Transportation Assessments are produced, and at an appropriate stage in the application
process, which accurately reflect any potential cumulative impacts on the trunk and local
road network. 
j. Other Key Policy Matters 
It is considered material to note that the current proposal is not a planning application but
an application under S37 of the 1989 Electricity Act. This is an important matter due to the
fact that Schedule 9 of the Electricity Act makes clear that the following determining factors
are paramount to the S37 determination and in determining whether objection should be
raised by the Planning Authority. 
The requirements when formulating Schedule 9 ‘relevant proposals’ are that it: 
“(a) shall have regard to the desirability of preserving natural beauty, of conserving flora,
fauna and geographical or physiographical features of special interest and of protecting
sites, buildings and objects of architectural, historic or archaeological interest; and 
(b) shall do what [it] reasonably can to mitigate any effect which the proposals would have
on the natural beauty of the countryside or any such flora, fauna, features, sites, buildings
or objects.” (Electricity Act, 1989, Schedule 9 (1(1)). 
Under Schedule 9 ‘relevant proposals’, in the case of electricity distribution, mean any
proposals: 
Page 165

Page 166

“… b) for the installation (whether above or below ground) of an electric line; or (c) for the
execution of any other works for or in connection with the transmission or supply of
electricity.” (Schedule 9, 1(3)) 
The proposed development in facilitating the provision of a high voltage line to transmit
energy created by renewable development is nationally important as recognised in NPPG
3 which clarifies that: 
4. An Enhanced High Voltage Energy Transmission Network is needed to facilitate
renewable electricity development and its export. The specific projects required for
this network are set out in the Electricity Networks Strategy Group, and will continue
to evolve as new opportunities emerge. ….Improvements to the distribution network are
also important to many remote rural areas. We support the provision of new infrastructure,
whilst acknowledging that full consideration of routes and development components will
be required at the consenting stage. ….As part of this national development, we want to
see planning enabling development of onshore links to support offshore renewable energy
development. A strategy for the marine grid, connecting with the onshore network, will
help to provide greater clarity on the offshore projects required. 
In addition the Argyll and Bute Renewable Energy Action Plan clarifies that: 
This Renewable Energy Action Plan has been developed to assist Argyll and Bute realise
its vision for the development of renewable energy:….Argyll and the Islands will be at the
heart of renewable energy development in Scotland by taking full advantage of its unique
and significant mix of indigenous renewable resources and maximising the opportunities
for sustainable economic growth for the benefits of its communities and Scotland. 
More specifically the Action Plan under Ref TC1 specifically supports the current
proposals and seeks to: 
Ensure the grid is fit for purpose to meet renewable energy opportunities – Inveraray-
Crossaig overhead line replacement, Northern Argyll substation, overhead line to
Taynuilt and submarine cable replacement programme 
Although none of the above would make an unacceptable development acceptable, it is
recognised by officers that essential major infrastructure projects such as is proposed
cannot be delivered without some impacts, including some significant localised impacts,
for particular areas. However, in reaching a determination on such matters it is essential
that the wider policy support for such proposals are taken into consideration and “weighed
in the balance” in determining whether an objection to the current proposals is appropriate. 
National Policy Framework 
As this is an application under S37 of the Electricity Act related to NPP3 delivery and
Nationally Important objectives in respect of the energy transmission network there are a
number of policy documents material to the consideration of the proposal. Officers are
content that the Planning Statement submitted with the application gives a fair and
comprehensive summary of the overall policy context and therefore it is not proposed to
repeat this in detail. However Officers would wish to highlight the following main points set
out in the submissions and agreed by officers: 
o The Proposed Development is identified within Annex A of National Planning
Framework  3 (NPF3) as a National Development under the class of
development noted as “new and  / or upgraded onshore electricity
transmission cabling of or in excess of 132 kilovolts and  supporting pylons”.
o The Proposed Development is for an extension to the OHL infrastructure in the
region  enabling increased capacity from 132kV to 275kV and connection to the
Page 166

Page 167

wider SPEN  network to enable renewable connections and transmission of
energy to the wider GB network.
o The Proposed Development will contribute to security of supply and provide
increased  and more resilient infrastructure capacity to facilitate renewable
energy connections in the  wider area – all of which forms vital elements to
deliver network and grid infrastructure  required to deliver the Government’s
legally binding targets for net zero emissions and  renewable energy electricity
generation objectives.
o The Proposed Development will be delivered in such a way that it is
environmentally acceptable and will include a co-ordinated and scheme of
landscaping and screening to the site. 
It is considered that this “high level” national policy support for renewable infrastructure
and the Council’s policy support for such necessary, renewable energy related
infrastructure is a significant material consideration in reaching a determination in this
instance. 
K. Conclusion 
Although some significant localised landscape effects will take place as identified in the
EIA, these are considered largely unavoidable with an infrastructure project of this scale.
The Council is supportive of delivering this renewable energy related infrastructure
upgrade within its Renewable Energy Action Plan under TC1 and the proposals represent
important National Infrastructure supported in NPP3. 
The EIA submitted with the application examines landscape and other impacts associated
with the proposals and concludes that some significant landscape impact will occur, these
are however localised in nature and the overall development proposals will not have a
significant landscape impact and is therefore acceptable. 
It is accepted in the submission that some localised significant visual impact will occur,
and in particular from VP 11 looking south from the Duncan Ban Monument. Officers agree
with the applicants view that the extent and level of impact is not sufficient to raise
objection to the overall proposals as the supportive National and Local policy framework,
which are supportive of such major grid infrastructure development necessary for
renewable energy transmission and the nationally important benefits these will bring to
meeting climate change targets and in promoting sustainable development. 
Although some significant localised landscape effects will take place as identified in the
EIA, these are considered largely unavoidable with an infrastructure project of this scale.
The Council is supportive of delivering this renewable energy related infrastructure
upgrade within its Renewable Energy Action Plan under TC1 and the proposals represent
essential National Infrastructure supported in NPP3 and draft NPP4. 
Importantly, NatureScot have not raised objection on landscape, ornithology or ecological
grounds and have expressed that they are in general agreement with the EIA evaluation
and conclusions. Officers can identify no reasons to depart from the findings and
conclusions of NatureScot, and therefore consider that the overall proposals are
considered acceptable in respect of landscape, ornithology and ecological impacts. The
Councils Biodiversity Officer also raises no objections. 
In respect of potential impacts upon cultural and historic assets, and the acknowledged
impacts within the EIA documents, HES have raised no objection to the proposals. Again
Officers can identify no reason to depart from the views of the expert consultee on such
matters. The Councils Conservation Advisor has raised no objections to the impact of the
proposed towers on the setting of the Category B Listed Duncan Bann monument. 
Page 167

Page 168

Transport Scotland raises no objection to the proposals, (including evaluating potential
cumulative impacts on the Trunk Roads Network) The Area Roads manager also raises
no objections to the proposals. 
Substantial tree felling is proposed and Officers agree with the Scottish Forestry that
appropriate conditions require to be imposed to secure appropriate compensatory planting
for the woodland to be felled to facilitate the current proposals, and that this replanting
should be within the Argyll and Bute Area. It is noted that the applicants have committed
to ensuring that compensatory planting is provided. Should land not be found to
accommodate the planting in agreement with landowners, funds should be made available
through to ACT to ensure the delivery of Community Woodland initiatives within the Argyll
Area has been the  implemented solution in respect of 18/01700/S37. 
Officers consider that overall the landscape, ecological, historic environment,
Transportation and other potential effects have been appropriately addressed and
mitigated in defining the proposed route, where a balanced judgement on competing
interests must be reached. Appropriate mitigation can be secured through the imposition
of conditions by the Scottish Ministers in line with the proposals set out within the EIA, or
within the consultation responses submitted to the ECU by other consultees set out in this
Report (and on the ECU website) as is normal practice for S37 applications. 
In conclusion, it is therefore recommended that no objection be raised to the current S37
proposal. 
Page 168

Page 169

Page 169

Page 170

This page is intentionally left blank

Page 171

Argyll and Bute Council
Development & Economic Growth 
This report is a recommended response to the Scottish Government’s Energy Consents
and Deployment Unit (ECDU) Section 36 consultation regarding the proposed
expansion of Cruachan Hydro Pump Storage Power Station 
Reference No: 22/01221/S36 (ECU REF:00004492)
Applicant:  The Scottish Government on behalf of Drax Cruachan Expansion Limited
Proposal:  Electricity Act Section 36 consultation relevant to construction and operation  
of new underground power station and associated infrastructure adjacent to  
Cruachan 1 to provide up to 600 megawatts (MW) of additional new 
generating capacity
Site Address: Cruachan Power Station, Lochawe, Dalmally 
Members are requested to note that as the Planning Authority are only a Consultee in respect
of S36 Electricity Act proposals. The website containing all application documents, external
consultee responses and third party representations can be found on the Energy Consents
Unit website, operated on behalf of the Scottish Ministers at the link below: 
Scottish Government - Energy Consents Unit - Application Details 
Clicking the documents tab will open a page where the application documents, consultation
responses and third party representations/objections can be viewed. 
(A) Section 36 application made up of the following elements: 
The Proposed Development will comprise the following main elements: 
• Upper Control Works – A new intake structure would be located within and adjacent 
to the Cruachan Reservoir to direct water into a new tunnel and underground 
waterway system;
• Underground Waterway System – A series of underground shafts and tunnels 
carrying water between the upper reservoir and lower reservoir, directed through the 
underground powerhouse cavern;
• Powerhouse Cavern - A series of underground caverns containing turbines and 
generators which will use water to produce electricity;
• Substation – The existing substation compound requires to be extended in order to 
provide a suitable connection to the existing overhead circuits that connects to 
Dalmally sub-station, located some 7km to the east.
• Ventilation Shaft – A ventilation shaft will be required to circulate fresh air through the 
underground access tunnel and cavern power station complex.
• Tailrace Tunnel – A concrete-lined low-pressure tunnel will conduct water between 
the turbines and Loch Awe, the lower reservoir.
• Lower Control Works – Comprising screened inlet / outlet structure, positioned in 
Loch Awe at the end of the tailrace tunnel below the water level. These structures 
would channel water in and out of Loch Awe;
Page 171 Agenda Item 9

Page 172

• Quayside – Constructed on the northern shore of Loch Awe to facilitate the 
construction of the underground access tunnels, waterway system and powerhouse 
cavern, and the temporary storage of spoil prior to its off-site removal; The quayside 
would also house a canopy structure, covering the stockpiles of spoil. The canopy
structure would be enclosed on 3 sides by brick / concrete walls and have a 
corrugated roof. The primary purpose of this structure would be to prevent silt from 
stockpiles mobilised by wind /rainfall from entering Loch Awe and the surrounding 
landscape.
• Administration building - above ground administration and workshop buildings 
required for day to day operational and maintenance tasks – located on the quayside;
• Storage Buildings - above ground buildings required for storage and plant and 
equipment required for regular plant maintenance – located on the quayside
• Access Tunnels – A main access tunnel of some 1450m in length would be 
constructed to provide access to the underground power plant, close to the shore of 
Loch Awe. This will cross connect to the existing Cruachan 1 to allow personnel to 
easily move between the plants and provide a further means of access/egress. 
(ii) Other specified operations 
The following temporary works will also be required for the Proposed Development:
•  An upper site compound to be used for construction laydown and concrete 
batching plant would be established in the vicinity of the existing dam. Once 
construction work for the Upper Control Works and sub-station is complete, this 
compound would be removed and the land restored;
• A lower site compound including workers welfare will be established to the North 
East of Lochawe village, with access from the junction of the A85 and B8077 
(Stronmilchan Road) (as shown on Figure 1.1 in Appendix A). Once construction 
work is complete, this compound would be removed and the land restored. The total 
area required for this compound would be approximately 9ha; 
(B) RECOMMENDATION: 
Officers recommend that Members agree that the Council does not object,
subject to the conditions as recommended by the Planning Authority and other
consultees. 
Officers also seek Member’s authority to undertake further discussions with the
applicants and The Scottish Ministers to determine whether a planning condition
or a Section 69 agreement between parties would most effectively address the
Council’s requirement for the necessary Housing Strategy to be delivered.
___________________________________________________________________
(C) CONSULTATIONS: 
ENERGY CONSENT UNIT RESPONSES: 
NatureScot (Dated 5.7.22 & 16.1.23) No Objection subject to appropriate mitigation
measures recommended being undertaken. Previous holding Objection withdrawn. 
Response Dated 5.7.22 
The Proposal is within the Loch Etive Woods Special Area of Conservation (SAC)
and the Coille Leitire Site of Special Scientific Interest (SSSI). The Proposal could
Page 172

Page 173

affect internationally important natural heritage interests and we therefore object to
this Proposal until further information is provided. This objection is due to a lack
of information in the Environmental Impact Assessment Report (EIAR) and the
supporting shadow Habitats Regulation Appraisal (HRA) of the Proposal in relation to
the Loch Etive Woods SAC. 
Response dated 16.1.23 
NatureScot had a holding objection in relation to the Loch Etive Woods Special Area
of Conservation (SAC) regarding potential impacts on the western acidic oak
woodland. Given the location of the Proposal we considered the potential impacts on
the woodland included: disturbance of the typical species, damage/ disturbance to
the typical species through the process of widening the road and generally increased
levels of noise and disturbance, and loss of qualifying habitat through the widening of
the existing road….. The Proposal is located within the Loch Etive Woods Special
Area of Conservation and the Coille Leitire Site of Special Scientific Interest (SSSI). 
The Proposal could be progressed with appropriate mitigation. However, the
Proposal could adversely affect natural heritage interests of national importance, and
we therefore object to it unless it is made subject to the measures we have identified. 
Mitigation: - The production of a Construction Method Statement, detailing road
stabilisation techniques and the retaining structures, prior to the commencement of
the Proposal. This should be agreed with NatureScot and Energy Consents Unit. 
The appraisal we carried out primarily considered the impact of the Proposal on the
following conservation objectives for the western acidic oak woodland of the Loch
Etive Woods SAC: - 
2a. Maintain the extent and distribution of the habitat within the site; - 
2b. Restore the structure, function and supporting processes of the habitat; and – 
2c. Maintain the distribution and viability of typical species of the habitat. 
Our advice in relation to the SAC above also applies to the upland oak woodland
interest of the Coille Leitire Site of Special Scientific Interest (SSSI)…. 
Glen Etive and Glen Fyne Special Protection Area (SPA) 
Our advice is that it is unlikely that the proposal will have a significant effect on the
qualifying interest either directly or indirectly. An appropriate assessment is therefore
not required. The Proposal is in a location where disturbance is unlikely and is further
mitigated by no above ground works during the breeding season. In addition, the
amount and location of habitat loss is not significant. 
Transport Scotland (TS) (Dated 25.11.22 & 9.1.23): No Objection subject to
conditions. 
In July 2022, Transport Scotland wrote to the applicant seeking clarification on a
number of areas. A meeting was held between the applicant team and Transport
Scotland to discuss the submitted information. This led to the submission of further
information by the applicant to Transport Scotland on a number of items and a further
technical meeting was held in October 2022. 
Temporary Traffic Management on A85(T) The EIAR states that construction of the
main access tunnel portal will require temporary traffic management on the A85(T). It
was initially proposed to redirect the A85(T) using a temporary build out on the loch
Page 173

Page 174

foreshore, however, further information has been submitted to justify discounting this
approach due to the additional material and construction timescale required to form
this option. We note that it is now proposed to utilise the existing informal layby on the
A85(T) which is currently used as parking for the Falls of Cruachan railway station as
well as for hill walkers, to form a temporary realignment to the north of the existing
A85(T), generally as illustrated on Stantec Drawing 331201086/001/C/0862. We also
note that at a width of 4.7m, the use of this layby will result in the need for one-way
signalised shuttle workings, lasting for approximately 3-4 months. Transport Scotland
has indicated a desire for two-way operation to be retained at this location during the
construction period and discussions continue on what might be possible at this location
and the applicant is currently considering alternative options. The applicant has also
indicated that whilst traffic management is in place on the A85(T), replacement public
parking and access will be provided within the existing Visitor Centre car park. The
details of this and the provision of appropriate pedestrian linkages along and across
the A85(T) will require to be agreed. With regard to the current application, Transport
Scotland is content that this aspect is covered by a Planning Condition and that the
details of the temporary diversions and construction methodology affecting the A85(T)
will be dealt with post-consent(should planning consent be awarded). 
….We note, however, that the installation of the signals and the shuttle working has
not been subject to any RSA at this stage. Transport Scotland will require a Road
Safety Audit to be undertaken for these works and submitted to the Area Manager.
This will require to be undertaken as part of the detailed design process for the traffic
management arrangements 
Abnormal Loads Assessment An Abnormal Indivisible Loads Assessment (AILA) has
been provided within the TA. This states that it is a preliminary assessment and that
detailed AIL access route assessments will be undertaken for each required AIL at the
time of the programmed movement dates, once the specification / dimensions of those
loads are known. We note that the Port of Entry for components has yet to be finalised,
and as such, the AIL route has yet to be finalised. Potential ports and associated routes
have been identified, however, as the A85(T) and A82(T) connect directly to the site
from the east and the west, constraints on these two sections have been identified
within the AILA based upon a preliminary desktop study. This assessment has
identified numerous height, width and weight restrictions on the A85(T) and A82(T)
between Oban and Crianlarich, all of which could require further investigation and
potential mitigation. We note that the AILA states that a transformer of a similar
dimension and weight to the one assumed in the assessment was successfully
transported to Cruachan Power Station from Longannet Power Station in Fife. This AIL
was transported during the night via the M876, M9, A84(T), A85(T), A82(T) and A85(T).
This required police escort, road closures on the A82(T) between Crianlarich and
Tyndrum and the temporary reinforcement of a bridge at Inverherive. We understand
that similar measures may be required during the delivery of AILs for the current
application and these would be assessed as part of future detailed AIL assessments.
Having discussed this issue with the applicant, Transport Scotland is content that the
issue of transporting AILs can be covered by appropriate Planning Conditions. 
(Members are requested to note that the conditions requested by TS have been set
out in the Appendix A at the appropriate section relating to Transportation matters). 
Marine Scotland Science (MSS) (Dated 25.10.22) No Objection 
We advise that baseline fish population surveys should be carried out on the River
Awe and other watercourses potentially impacted from the proposed development.
Surveys should take place annually for at least 12 months prior to construction, during
Page 174

Page 175

construction and for the first three years in the operational phase to monitor any
changes in the fish populations and habitat throughout the construction and operation
period. 
MSS welcome the proposed Fish Monitoring and Management Plan (FMMP) and note
that a smolt tracking study will be undertaken prior to the operational phase of the
proposed development. MSS advise that this study should commence prior to
construction taking place to gain baseline data on the outward migration of smolts from
the River Orchy via Loch Awe, past the proposed development and to continue for at
least two years of the operational phase of the development. 
MSS welcome the proposed gill netting to exploit a larger survey area and to ascertain
fish populations on both Loch Awe and Cruachan Reservoir. MSS advise that other
techniques, that are less stressful on fish populations, should also be considered e.g.
eDNA analysis. 
MSS welcome the proposed mitigation measures including the appointment of an
Ecological Clerk of Works, the use of an appropriately designed guidance system to
minimise fish swimming towards the inlet/outlet, avoiding the smolt migration period
when carrying out piling works, appropriately designed screens, controlling water
velocities at inlet/outlet screens to not exceed 0.3 m.s -1 , regular cleaning of screens
(SEPA state in their comments that fish screening will be considered at the CAR stage
of the application), limiting artificial lighting to a distance of 10 m from waterbodies, a
pollution prevention plan and a biosecurity management plan. 
MSS welcome the proposed erosion prevention and sediment control plan and
Construction Phase Surface Water management Plan the aim of which is to reduce
the impacts on water quality and prevent hydro-morphological changes to surface
water features during construction. MSS advise that these plans should also consider
the potential impact associated with the release of concrete, sediment, fuel
/hydrocarbons and acidic leachates (as highlighted by SEPA in their response) on the
water quality and fish populations. 
The resilience of fish populations to the potential impacts should be considered in the
EIA report, particularly due to the large scale of this proposal. There is good information
available on the resilience and state of the salmon population throughout Scotland 
(Additional information provided on these matters in FEI on 14.12.22) 
National Grid (Dated 8.6.22) No Objection 
No assets in the area. 
Scottish Water (Dated 10.6.22) No Objection 
There is currently sufficient capacity in the DALMALLY Water Treatment Works to
service your development. However, please note that further investigations may be
required to be carried out once a formal application has been submitted to us 
A review of our records indicates that there are no Scottish Water drinking water
catchments or water abstraction sources, which are designated as Drinking Water
Protected Areas under the Water Framework Directive, in the area that may be
affected by the proposed activity. 
Page 175

Page 176

Royal Society for the Protection of Birds Scotland (RSPB) (Dated 24.6.22) No
Objection 
RSPB Scotland is in broad support of the findings and proposed mitigation measures
outlined in the Applicant’s Environmental Impact Assessment Report (EIAR) and
raises no objection to the Proposed Development. 
RSPB Scotland is satisfied that appropriate avoidance and mitigation measures have
been put forward to minimise impact, and that the Habitat Restoration and
Landscape Mitigation Plan (to be produced prior to commencement of works) will
include the restoration of disturbed peat, leading to insignificant residual negative
effects. 
Further, in respect of addressing Adverse significant effects at the Site level on oak
and birch woodland (also known as Atlantic Oakwood, or Scotland’s Rainforest)
RSPB Scotland is pleased to note that both like-for-like replacement, additional tree
planting and the facilitation of natural regeneration through browser exclusion will be
outlined in the Habitat Restoration and Landscape Mitigation plan. 
Argyll District Salmon Fishery Board (Dated 28.6.22) No Objection but request
additional matters should be considered by EIA 
We welcome the inclusion of the chapters on Hydrology and Ecology which should
include Fishery management interests. However, the survey work carried out on Loch
Awe and the Cruachan Reservoir, summarised on page 119 in the report do not fully
cover our concerns of entrapment of fish, specifically salmon smolts as they migrate
past the scheme intake in spring. 
On the basis that the scheme has historically entrapped fish, we ask that this should
be considered by the EIA. This is especially important when considering that some
90 % of Atlantic salmon smolts in the catchment migrate from the River Orchy and
other tributaries around Loch Awe and will pass the intake for the scheme.
Consequently, we will need to be assured that all measures are put in place to
ensure that smolts and other fish are not drawn into the hydro scheme. 
(Additional information provided on these matters in FEI on 14.12.22) 
Scottish Environment Protection Agency (SEPA) (Dated 30.8.22 & 20.1.23)
Holding Objection based on lack of information. 
30.8.22 Response 
We have reviewed the information supplied with the EIAR and have found it to be
insufficient to allow us to determine the potential impacts. We therefore submit a
holding objection and request determination be deferred until further information is
provided in relation to hydrogeological / groundwater issues, site ecology and flood
risk as detailed in Sections 1, 4 and 5 below. We will review our position if these
issues are adequately addressed. 
Although EIAR Section 14.9.20 reports it is not anticipated there will be any barriers
to finding parties and businesses able to accept the materials we understand further
market assessment is required to identify and investigate a local market option. As
such there is no clarity on the locally viable option for the material within 5 miles. 
Page 176

Page 177

We support the intention produce a Site Waste Management Plan (SWMP) and that
this is to remain a live document throughout the duration of the construction period.
We request a planning condition requiring the preparation of a full SWMP once
design and contracting elements of the project are confirmed. We agree this should
build on the information provided in the EIAR and specifically, given the potential
implications for its storage and the reuse potential of the material, this will also need
to be informed by the outcome of further assessments required in relation to the
potential for the geology at the site to generate acidic leachates and acid rock
drainage as discussed in Section 1 above and Appendix 2 enclosed. 
4.1 We have concerns regarding the impact to groundwater dependent flush habitats,
in the Lower Site Compound area and throughout Upper Works (particularly down the
slopes leading into Cruachan Reservoir and down to the existing Access Track). The
mapping provided in Figures 3.3 and 3.4 of EIAR Appendix 8.1 Non-Avian Ecology
does not show the location of the flushes and the text has not made it clear how
close the flushes are to excavation areas, nor their relative position. The M10 and
M11 base-rich flushes can be assumed to be groundwater dependent, however the
groundwater dependency of other potential GWDTE habitats noted on site has not
been assessed. 
We therefore request further information be provided to: a) Assess the likelihood of
groundwater dependency of the potential GWDTE habitats which will be directly or
indirectly impacted by the development. M10 and M11 flushes are assumed to be
groundwater dependent so do not need to be included in the assessment; and b)
Illustrate the relative position of the infrastructure and excavation areas in relation to
the flushes, other groundwater dependent wetlands and wetlands valuable for nature
conservation (i.e. all levels of importance above site level). The groundwater
dependent wetlands should only be included for those assessed as being likely to be
groundwater dependent. 4.2 Given the reliance on the Habitat Restoration and
Landscape Mitigation Plan to address impacts to wetland habitats and peat we
request an outline plan is provided prior to determination for review. A planning
condition should also be applied to require the full plan to be submitted before
commencement. Damage to groundwater dependent flushes is often permanent; it is
difficult or impossible to reinstate or restore flushes after direct impact or redirection
of groundwater emergence; the HRLMP, CEMP and infrastructure layout must
consider this and address the likely outcome for these habitats, which are important
for nature conservation. 4.3 Further information must be provided on the layout of the
Lower Site Compound and the requirement to excavate at this location. The applicant
should clarify if alternative locations for the Lower Site Compound were considered, if
excavation can be avoided where peat depth is greater than 0.5 metre and if there
are flushes in the Lower Site Compound area and how will these be managed 
Therefore, a flood wall to a 1 in 100 SoP will not ensure the development will
necessarily remain operational during a 200-year event. FRA Appendix E indicates
the precise SoP is 107-year event and anything greater will overtop the proposed
wall. We therefore request the design of the flood wall is modified to ensure it is
designed and constructed to remain operational during the 1 in 200 year flood even
During the construction phase of the project it is anticipated 2.3 million tonnes of
excavated rock arisings will be produced over the 5.5 year construction period (2024-
mid 2029). EIAR Section 3.8.2 indicates that the excavation arisings will be in the
form of rock ‘chippings’ ranging from boulders to fines produced by drill and blast
techniques. It is reported that drill and blast methodology is assumed to be used for
all underground works….0.45 million tonnes of excavated material is to be reused on
site. It is proposed that 140,800 tonnes of material will be used towards the
construction of a 510m long quayside structure on Loch Awe and used in concrete
Page 177

Page 178

production. The excavation arisings, 15,000 tonnes of spoil at any one time, will be
stored on the quayside structure, prior to transportation off-site by road. The arisings
will be stored under a canopy structure, enclosed on three sides to prevent runoff and
windblown silt from entering Loch Aweon for lining the tunnels. There is currently no
agreed use for the remaining excavated material. 
We also request, if you are minded to grant consent, the planning conditions detailed
in Sections 2.6 (Site Waste Management Plan), 4.2 (Habitat Restoration and
Landscape Mitigation Plan) and 4.8 (Peat Management Plan) be attached to the
consent. 
(Additional information provided on these matters in FEI on 14.12.22) 
20.1.23 Response 
Potentially Acid Generating (PAG) Rock Construction of the Cruachan Expansion
Project will require the removal and management of an estimated 2.3 million tonnes
of rock. The EIAR states it is likely some of the arisings will be Potentially Acid
Generating (PAG) rock. We previously requested more information to understand the
potential for the site geology to generate acidic leachates and acid rock drainage and
to evaluate the appropriateness of material reuse as fill materials and concrete
aggregates. The findings from the initial investigation in the submission are that some
of the material is likely or highly likely to be potentially acid generating which means
the rock arisings could potentially leach acidic leachate and mobile metals. This will
heavily influence material storage, transport, disposal and potential reuse options. 
While we agree with the applicant that an Acid Rock Drainage (ARD) Management
Plan will be required (and secured as a planning condition), there remains significant
uncertainty regarding the amount of material which will be potentially acid generating.
No information has been provided to estimate the scale of the issue. We therefore
cannot currently advise on the potential environmental effects associated with this
element of the project. 
It is likely this material will have to be segregated and disposed of at an appropriate
site (i.e. landfilled) with mitigation to prevent environmental impacts and regulation by
SEPA under the Pollution Prevention and Control (Scotland) Regime (PPC). At this
stage it is not clear what size of site would be needed and whether a suitable one
would be available to accept the material. This represents a significant environmental
risk which we expect to be addressed before determination. 
On that basis we maintain our holding objection on grounds of lack of information in
relation to the potential impacts associated with the potentially acid generating rock.
To allow us to revisit this position we require further information to outline how much
material is potentially acid generating, what will be the disposal method for it, the
environmental risks involved and the contingencies should more material than
anticipated be affected. 
Members are requested to note that Officers discussed this further holding objection
with SEPA on 22.1.23. It has been clarified that this is not an objection in principle to
the development but a technical matter they require to be satisfactorily addressed
before withdrawing their holding objection. This will be a matter for the ECU to resolve
prior to reaching their conclusion on the proposal, and is not a matter which changes
the recommendation of this report. 
Scottish Forestry (Dated 17.1.23) No Objection
Page 178

Page 179

From the additional information it would appear that tree felling is limited to the removal
of individual trees associated with the Lower Works area (Loch Awe). The information
states that any trees removed will be replaced like for like and this will be detailed in a
Habitat Restoration and Landscape Mitigation Plan which will be produced prior to the
commencement of works. As the forestry works are limited, SF advise there would be
no need for a dedicated compensatory planting condition on this occasion, assuming
that the Habitat Restoration and Landscape Mitigation Plan includes the replacement
tree proposals and that the plan and its implementation are secured by a condition. 
Historic Environment Scotland (HES) (No response on ECU website) 
It is understood by Officers that additional information was sought by HES in respect
of the proposals which was included in the additional FEI submissions dated 14.12.22.
HES have been granted an extension of time to respond by the ECU to 31.1.23. Any
response provided prior to PPSL will be reported to Members. 
Defence Infrastructure Organisation/ Ministry of Defence (MOD) (Dated 18.1.23) 
This application relates to a site outside of Ministry of Defence safeguarding areas. I
can therefore confirm that the Ministry of Defence has no safeguarding objections to
this proposal. 
Please note: the above are summaries and the full external consultee responses
can be viewed on the Energy Consent Unit website. 
ARGYLL & BUTE COUNCIL INTERNAL CONSULTATION RESPONSES 
.
ABC Area Roads (20.1.23) No Objection subject to conditions. 
The proposal is situated off the A85 Oban-Tyndrum Trunk Road within a rural 60mph
speed restriction. Trunk Roads to comment on A85 issues. 
It is noted that the Trunk Road network will probably be impacted more than the local
area network. If the local area roads network is to be affected by disposal of excavated
materials for any reason then commensurate improvements may be required to
facilitate significant additional vehicle movements at the developer’s expense. 
 Information to be provided on locations for disposal of material from works,
specifically the impact on local area roads and infrastructure. Construction
Traffic Management Plan to be provided if necessary. 
 Traffic Impact Analysis required to cover any potential impact on Argyll and
Bute Council local area roads. This report should include a cumulative report
in concert with other S36 and S37 schemes in the North Argyll/ Loch Awe area
paying particular attention to the possibility of utilizing materials locally to
prevent unnecessary vehicle movements thus reducing the potential for related
deterioration of the fragile local area roads network. 
ABC Environmental Health (10.11.22) No Objection subject to conditions 
Noise and Vibration 
The noise and vibration survey identified 15 Noise and Vibration Sensitive Receptors.
The sensitivity of 11 of the 15 identified receptors has been classed as high, 10 of
which are residential sites. 
Page 179

Page 180

The Environmental Impact Assessment Report Volume 1 – Main Report May 2022
states that ‘surface work is expected to take place Monday – Saturday 7am -7pm and
Sundays 7am – 12pm with underground works expected to take place 24 hours a day’ 
With the number of noise and vibration sensitive receptors in the vicinity of the site, I
would suggest the following condition: 
’Surface work and underground work should be restricted to:  
• Monday to Friday: 0700 hours until 1900 hours. 
• Saturday: 0700 hours until 1700 hours. 
• Sunday / Public holidays: – no works, except for servicing and maintenance
of plant and equipment and emergency work. 
Reason: In order to protect the amenities of the area from noise and vibration
nuisance and to minimise local community annoyance” 
It is understood that a project of this magnitude may require some construction
activities to be take place outside of these hours. Environmental Health will
consider all applications for construction activities outside of these hours and
will remain flexible (without detriment to the local residents) throughout the
project. 
Private Water Supplies 
In order to protect the identified private water supplies and the residents reliant
upon these supplies; Environmental Health request that detailed information be
provided on how these 17 private water supplies will be protected during the
construction and operation phases of the proposed development. 
Reason – in the interest of public health and to ensure adequate measures are
in place to protect the identified private water supplies 
Lighting 
Artificial lighting will be used during the construction phase of the proposed
development. Mitigation measures have been identified in the Draft
Construction Environment Management plan. Environmental Health would be
satisfied as long as the mitigation measures identified are implemented. 
Similar, mitigation measures should be identified and implemented for the
operational phase of the proposed development. 
Dust 
The Draft Construction Environment Management plan has identified activities
associated with the potential to generate dust. Specific control measures have
been identified to ensure the employment of best practical means to minimise
the risk of adverse effects from construction dust. 
Environmental Health would be satisfied as long as the specified control
measures identified are implemented. 
Page 180

Page 181

Conclusions 
Environmental Health have no objections to the proposed development. 
ABC Conservation and Heritage Officer (Dated 29.11.22 & 23.1.23) No 
Objection subject to conditions 
29.11.22 Response 
From Figure 11.8d (visualisation in 10 years’ time) the Upper Intake/Outlet has 
a significant visual impact on the setting of the dam. Figure 11.5 (of Appendix 
11.1) touches on mitigation measures in terms of planting yet these do not 
appear to have been shown on this visualisation. However even with the 
measures proposed in 11.5 I think that the proposed form and location of the 
excavation would have an unacceptable significant adverse effect on the setting 
of the dam. 
From the section shown in Figure 3.2 it is not clear why such a large flat
hardstanding is required and if possible, this should be reduced to reduce the
impact on the landscape which forms part of the dam’s setting. 
Otherwise, alternative siting of the Upper Intake/Outlet should be considered
(to an area where less excavation is required) which would have less of an
adverse impact on the setting. 
23.1.23 Response 
Further to my previous comments below, we discussed yesterday that the
proposed structure would not be highly visible from either the ascent up towards
the B-listed Dam (where it would be screened by hill in front of it), or from higher
up Ben Cruachan (where the key views are wider views towards River Awe). 
The proposal will therefore have a limited effect on how the Dam’s setting of
Ben Cruachan is seen and experienced. Whilst it will be highly visible from the
immediate vicinity of the Dam (as per Visualisation 11.8d) it could be considered
that this location is not from where the Dam is principally viewed (which could
be considered to be from below from where, as stated above, it would be
screened). Setting also includes the experience or understanding of a place,
and this structure provides a link to the workings within the Turbine Hall below. 
However I would recommend that a Planning Condition be included in terms of
the finish of the “box” and the contouring of the rock to mitigate any adverse
effects as viewed from the immediate vicinity of the Dam. 
ABC Local Biodiversity Officer (28.11.22 & 25.1.23) No Objection 
28.11.22 Response
Having reviewed the supporting documents, I concur with the issues that NatureScot
have raised in relation to this proposal as it is within the Loch Etive Woods Special
Area of Conservation (SAC) and the Coille Leitire Site of Special Scientific Interest
Page 181

Page 182

(SSSI). The proposal could affect internationally important natural heritage interests
and as such NatureScot object to this proposal until further information is provided.  I
note that the objection is due to a lack of information in the Environmental Impact
Assessment Report (EIAR) and the supporting shadow Habitats Regulation Appraisal
(HRA) of the Proposal in relation to the Loch Etive Woods SAC.
Once these issues have been resolved, I am content to provide comments as
appropriate; in the meantime, I wish that my comments are treated as a holding
response. 
25.1.23 Response
I note the contents of the latest submissions that clarify the works within the Loch Etive
Woods Special Area of Conservation (SAC) and the Coille Leitire Site of Special
Scientific Interest (SSSI). 
I concur with NatureScot’s (statutory consultee) recommendations in terms of including
conditions that reflect the proposed mitigation as well as a Construction Method
Statement which will need to be agreed in advance with the statutory consultee and
the applicant consultants and added to the Construction Environment Management
Plan. 
ABC Access Manager Response (Dated 20.1.23) No Objection 
It is important to note that the road leading up to the reservoir is heavily used by the
public walking and cycling.  If construction traffic is going to use this route it will be
necessary to consider how this is managed to ensure the safety of the public and
construction workers.  It may be necessary for construction traffic to be reduced at
weekends and during holiday periods when the greatest numbers of walkers and
cyclists are likely to be using this road.  Another major route is from Loch Awe Station
and the Cruachan Visitor Centre beside the Allt Cruachan and Falls of Cruachan to the
dam. 
Where a developer needs to exclude the public from an area of land or water to allow
construction any diversions must be for the minimum area and shortest period of time
possible.  For a project of this scale any closures will need to be planned such that
people can continue to make a circuit of Ben Cruachan and Stob Daimh throughout
the construction period.   I have assumed that some work may be required in the
vicinity of the Dam Wall which again may require walkers to use the track below the
dam and it may be necessary to provide a short section of new path to facilitate this. 
The location of the Upper Intake in particular will impact on hill walkers’ access to and
from Stob Daimh and Stob Garbh and will need to be carefully managed.  It may be
necessary to provide a temporary diversion route around the construction site and a
permanent diversion once work is complete. 
Although it is possible that I have missed it the developer must submit an Access Plan
which details how the development will impact the public’s legal rights of access during
and after the construction of the Cruachan Expansion Project.  In view of the scale and
expected duration of the construction work which will be across a number of areas
within the overall site it is likely that the plan will need to be phased.  In conclusion I
am asking that the developer is required to provide an Access Plan which must be
approved by the Council before construction can commence. 
Guidance on producing an Access Plan can be found here Microsoft Word -
A409251.doc (nature.scot) & Guidance - Good practice during Wind Farm construction
| NatureScot .  In summary the Access Plan should provide the following information.
Page 182

Page 183

ABC Planning Policy Officer (dated 2/2/23): The principle of this development is
supported by Planning Policy at both Scottish Government and Local Development
Plan policy.  This is because the potential for additional pumped storage was identified
in National Planning Framework 3 published in 2014, and it has also been identified
as a National Development in the Final Draft National Planning Framework 4 which
was approved by the Scottish Parliament 11 January 2023 and is to be adopted by
Scottish Ministers and will become part of the Development Plan on 13 February 2023. 
Specifically the Cruachan Pumped Storage Project is part of the Pumped Storage
Hydro identified as a Scotland wide National Development 9 under the “Productive
Places” theme with significant potential for enhanced capacity and creation of
significant job opportunities in a rural location.  The proposal would also be supported
under NPF4 Policy 11 – Energy which sets out that “development proposals for all
forms of renewable, low carbon and zero emissions technologies will be supported”,
including energy storage, such as pumped storage hydro.  This support is subject to
an expectation that they maximise net economic impact, including local and community
socio-economic benefits such as employment, associated business and supply chain
opportunities. 
As a national development NPF4 expects the Cruachan Expansion Project to promote
a just transition to a low carbon economy and to be an exemplar of community wealth
building whereby “A people-centred approach to local economic development, which
redirects wealth back into the local economy, and places control and benefits into the
hands of local people” is promoted. 
In terms of the Argyll and Bute Local Development Plan 2015 (LDP2015), renewable
energy generation is identified as one of Argyll and Bute’s competitive advantages in
relation to economic development, and significant hydro energy developments are
shown in the Spatial Strategy diagram for Oban and Lorn (page 12).  As part of the
settlement strategy renewable energy developments are identified as one of the
specific categories of development which may be supported in Very Sensitive
Countryside in Policy LDP DM1.   The importance of creating a sustainable and
growing economy is identified in Chapter 4 of LDP2015, where renewables are
identified as one of our key growth sectors, Policy LDP 5 seeks to support the
development of new industry and business which helps deliver sustainable economic
growth throughout our area by taking full account of the economic benefits of any
proposed development.  The justification for this policy includes recognition that a
successful and vibrant economy is fundamental to retain population and attract new
people to the area.  Policy LDP 6 supports the sustainable growth of renewables where
it can be adequately demonstrated that there would be no unacceptable significant
adverse effects, whether individual or cumulative on local communities, natural or
historic environments, landscape character and visual amenity, and that the proposals
would be compatible with adjacent land uses.   
The proposed expansion of pumped storage at Cruchan is a significant development
both as a recognised national development and particularly in the context of its location
in north Argyll and in the Tobermory –Oban – Dalmally growth corridor as identified in
Proposed Local Development Plan 2.  The applicants have stated that the project will
involve “significant investment with capital expenditure in excess of £450million which
will be accompanied by associated expenditure in the local economy with local shops,
restaurants, transport providers and businesses associated with the construction and
development expected to benefit.”  They also state: “The construction of the Proposed
Development is estimated to support 357 full time equivalent jobs in Argyll and Bute
over the six-year construction programme. Job creation during construction of the
proposed development brings a huge economic benefit to the area. At the peak of
Page 183

Page 184

construction, it is estimated there will be approximately 300 staff working on site, with
an average of 150 – 200 workers over the six-year programme.”   This level of capital
expenditure and the level of jobs to be created, is considerable and is likely to have a
significant impact on the local economy and communities of north Argyll. 
In particular the level of jobs that will be created during the construction period of the
project which is expected to last up to 6 years is considerable.  It will be important to
ensure that the local economy is able to benefit from these, and is not actually
disadvantaged by the increased competition for workers and most importantly the
increased demand for housing.   The Oban and Lorn housing market area, is already
one of the more pressured in Argyll and Bute, with higher levels of demand for housing,
and a higher proportion of existing housing stock being in use as short term lets to
support the important tourism sector of the local economy.   The use of temporary
accommodation, or loss of tourist accommodation to provide homes for construction
workers on the Cruachan expansion project, would have an adverse impact on local
communities and the local economy.  The applicants should therefore be asked to
provide additional information to demonstrate how they intend to address this, in order
to demonstrate compliance with development plan policy. 
The other issue which has the potential to have significant impacts on local
communities, the local road network and the local economy is in relation to the waste
material from the construction project. The applicants have stated that: “The
construction of the Proposed Development is anticipated to generate up to 2.30 million
tonnes of excavated rock arisings over the 5.5 -year construction period (2024-mid of
2029). An average of 1,600 tonnes per day with peak generation of c. 3,000 tonnes
per day.  Approximately one fifth of this material (0.45Mt) will be re-used on Site,
therefore, there will be a residual volume of 1.85 Mt of spoil which will be re-used off-
site.  During construction, approximately 15,000 tonnes spoil will be stored on the
quayside structure at any one time, prior to removal by road.”  Further information will
be required as to how this material will be handled in terms of transportation, local
reprocessing, and end use.   
Without more detail from the applicants in relation to their recruitment and
accommodation strategy for workers involved in the construction and how they
propose to deal with the hard rock waste from the construction project, compliance
with planning policy in NPF4 and the Local Development Plan is not assured and
appropriate mitigation as in the Environmental Impact Assessment Report is not
demonstrated. 
___________________________________________________________________
(D) REPRESENTATIONS: 
As this is a S36 proposal representations must be sent to the ECU and not the
Planning Authority. In respect of Public Representations the Energy Consents unit at
time of writing three representations/objections have been lodged to the proposals by
the following parties: 
 Nigel MacBeath 1 Railway Cottage Falls of Cruachan Argyll PA33 1AW 
Concerns over impact of construction on residential amenity (Objection) 
 Andreas Wolff 25 St Conans Rd Lochawe PA33 1A 
Page 184

Page 185

Concerns over impact of development and movement of spoil on St Conans Road
(clarifies that does not object to proposals) 
 Lorraine McFee, Brae House, Kilchrenan Argyll PA35 1HD, 
Proposals are not compliant with UK energy policy which does not reference pump
storage. Financial case has not been properly justified by applicant and proposal will
cause unacceptable harm and disruption to the local community. 
The above matters will be for the Scottish Ministers to consider in determining the
application.  However having read the submissions, Officers are content that there are
no substantive planning matters raised within them which would alter the
recommendation of this report to Members, as either they are not material planning
considerations or can be addressed through the imposition of appropriate conditions
on any deemed planning consent issued by the Scottish Ministers in accordance with
recommendation. 
Note: please note that the letters of representation above have been summarised
and that the full letters of representations are available on the Energy Consents
Units website at the link previously provided in this report.
___________________________________________________________________ 
(E)  SUPPORTING INFORMATION 
Has the application been the subject of:
i) Environmental Impact Assessment Report (EIAR): Yes 
EIAR (May 2022) comprising:   
 Volume I: Main Report
 Volume II: Figures and Appendices
 Volume III: Technical Appendices; 
 Volume IV: Non-Technical Summary (NTS) 
Key matters covered in the EIAR include: 
 Flood Risk Assessment; 
 Loch Awe Water Levels Report; 
 Species Reports: Bat, Otter, Ornithology, Fisheries, Badger, Red Squirrel, Pine
Martin; 
 Ecological Constraints Plan; 
 Habitats Regulation Assessment; 
 Transport Assessment; 
 Draft Construction Traffic Management Plan; 
 Noise Monitoring; 
 Draft Peat Management Plan; 
 Cultural Heritage Assessment; 
 Listed Buildings Consent; 
 Draft Construction Environmental Management Plan; 
 Schedule of Mitigation; 
 Planning Statement; 
 Design Statement; and 
Page 185

Page 186

 Statement of Consultation and Engagement. 
Further Environmental Information (FEI) (December 22) comprising: 
Further Information was provided on 14.12.22 in response to matters raised in
consultation responses to the initial EIAR related to the following headings. 
 Ground Conditions
 Cultural Heritage
 Transport and Access
 Scottish Forestry
 BT
 Argyll and District Salmon Fisheries Board
 Public Representations 
ii) An appropriate assessment under the Conservation (Natural Habitats)
Regulations 1994: If required – this will be undertaken by the ECU as the Determining
Authority in this case.   
iii) A design or design/access statement:   Yes Design Statement within EIAR 
iv) A report on the impact of the proposed development e.g. Retail impact, transport
impact, noise impact, flood risk, drainage impact etc.: All relevant reports are
encompassed within the EIAR and additional FEI submissions. 
Members are requested to note that a more recent policy update dated 20.1.23 has
been submitted by the applicant to address NPF 4 which comes into force on 13.2.23
as a statutory development plan. This has been placed on the Council website. 
(F) Local Development Plan (LDP) and any other material considerations over and
above those listed above which have been taken into account in the assessment
of the application: 
Members are asked to note in the context of the Local Development Plan (LDP) and
planning process that this application has been submitted to the Scottish Government
under Section 36 (S36) of the Electricity Act 1989.  As part of the S36 application
process, the applicant is also seeking that the Scottish Ministers issue a Direction under
Section 57 (2) of the Town and Country Planning (Scotland) Act 1997 that deemed
planning permission be granted for the proposal.  In such instances, the LDP is not the
starting point for consideration of S36 applications, as Sections 25 and 37 of the Town
and Country Planning (Scotland) Act 1997 which establish the primacy of LDP policy in
decision-making, are not engaged in the deemed consent process associated with
Electricity Act applications.  Nonetheless, the adopted Argyll & Bute LDP 2015 still
remains an important material consideration informing the Council’s response to the
proposal. 
Schedule 9 of the Electricity Act does require both the applicant and the decision-maker
to have regard to the preservation of amenity.  It requires that in the formulation of
proposals the prospective developer shall have regard to: 
Page 186

Page 187

(a) the desirability of preserving natural beauty, of conserving flora, fauna and
geological or physiological features of special interest and of protecting sites,
buildings and objects of architectural, historic or archaeological interest; and 
(b) shall do what he reasonably can to mitigate any effect which the proposals
would have on the natural beauty of the countryside or on any such flora, fauna,
features, sites, buildings or objects. 
Similarly, it obliges the Scottish Ministers in their capacity as decision maker to have
regard to the desirability of the matters at a) and the extent to which the applicant has
complied with the duty at b).  Consideration of the proposal against both the effect of
SPP (2014), NPF 3, the adopted Argyll & Bute LDP 2015 and as from 13.2.23, revised
Draft NPF 4, will ensure that proper consideration is given by the Council to the extent
which the proposal satisfies these Schedule 9 duties. 
As of 13 February 2023 The Scottish Ministers will be required to consider National
Planning Framework 4 (NPF4) and the policies and objectives contained therein which
are referenced elsewhere in this report in terms of their materiality to the determination
of the current proposals. 
It is fair to summarise that this is a period of transition in respect of NPF 4, and therefore
the interpretation and application of not only the policies of NPF 4 but also the wider
objectives contained therein, are still subject to consideration by Officers as to how these
ambitions can be delivered in a competent manner. The interaction of the current S36
application, determined under the Electricity Act, not the Planning Acts, (but with a
deemed planning consent issued to the Planning Authority for compliance) raises new
and potentially complex procedural and policy matters which are still in a period of
transition. 
(i) List of all Development Plan Policy considerations taken into account in
assessment of the application. 
Argyll & Bute Local Development Plan (2015) 
LDP STRAT 1 – Sustainable Development
LDP DM1 – Development within the Development Management Zones
LDP 3 – Supporting the Protection, Conservation and Enhancement of our
Environment
LDP 5 – Supporting the Sustainable Growth of Our Economy 
LDP 6 - Supporting the Sustainable Growth of Renewables 
LDP 8 – Supporting the Strength of Our Communities
LDP 9 – Development Setting, Layout and Design
LDP 10 – Maximising our Resources and Reducing our Consumption
LDP 11 – Improving our Connectivity and Infrastructure 
Supplementary Guidance to the Argyll & Bute Local Development Plan 2015 & 2016 
SG LDP ENV 1 – Development Impact on Habitats, Species and Our Biodiversity (i.e.
biological diversity)
SG LDP ENV 2 – Development Impact on European Sites 
SG LDP ENV 4 – Development Impact on Sites of Special Scientific Interest (SSSIs)
and National Nature Reserves 
SG LDP ENV 6 – Development Impact on Trees / Woodland
SG LDP ENV 7 – Water Quality and the Environment
Page 187

Page 188

SG LDP ENV 11 – Protection of Soil and Peat Resources
SG LDP ENV 13 – Development Impact on Areas of Panoramic Quality (APQs)
SG LDP ENV 14 –Landscape
SG LDP ENV 16(a) – Development Impact on Listed Buildings 
SG LDP PG 1 – Planning Gain
SG LDP BAD 1 – Bad Neighbour Development
SG LDP Sustainable - Sustainable Siting and Design Principles 
SG LDP SERV 5 – Waste Related Development and Waste Management 
SG LDP SERV 6 – Private Water Supplies and Water Conservation
SG LDP SERV 7 – Flooding and Land Erosion – The Risk Framework for Development
SG LDP TRAN 1 – Access to the Outdoors
SG LDP TRAN 4 – New and Existing, Public Roads and Private Access Regimes
SG LDP TRAN 6 –Vehicle Parking Provision 
Supplementary Guidance 2 (December 2016) 
Note: The above supplementary guidance has been approved by the Scottish
Government. It therefore constitutes adopted policy and the Full Policies are
available to view on the Council’s Web Site at www.argyll-bute.gov.uk 
(ii) List of other material planning considerations taken into account in the
assessment of the application, having due regard to Annex A. 
 National Planning Policy Framework, Scottish Government (NPF3 (June 2014) and
Revised Draft NPF4 (to come into force on 13.2.23)
 Scottish Planning Policy (SPP), Scottish Government (June 2014)
 Planning Advice Notes & Web-based Renewables Guidance
 Renewable energy and climate change framework
 Climate Change (Emissions Reduction Targets) (Scotland) Act 2019
 The Future of Energy in Scotland: Scottish Energy Strategy, Scottish Government
(December 2017)  and position Update dated 16.3.21 
 Scotland’s Draft Energy Strategy and Just Transition Plan and Ministerial
statement  (Dated 10.1.23)
 The Scottish Government’s Policy on ‘Control of Woodland Removal’ (Forestry
Commission Scotland 2009) 
 Views of statutory and other consultees;
 Planning history of the site
 Legitimate public concern or support expressed on relevant planning matters 
 Argyll and Bute proposed Local Development Plan 2 (November 2019) – The
unchallenged policies and proposals within pLDP2 may be afforded significant
material weighting in the determination of planning applications at this time as the
settled and unopposed view of the Council. Elements of the pLDP2 which have
been identified as being subject to unresolved objections still require to be subject
of Examination by a Scottish Government appointed Reporter and cannot be
afforded significant material weighting at this time. The provisions of pLDP2 that
may be afforded significant weighting in the determination of this application are
listed below: 
 Policy 14 – Bad Neighbour Development
 Policy 35 – Design of New and Existing, Public Roads and Private Access
Regimes
 Policy 36 – New Private Accesses
 Policy 37 – Development Utilising an Existing Private Access or Existing Private
Road
Page 188

Page 189

 Policy 38 – Construction Standards for Public Roads
 Policy 39 – Construction Standards for Private Access
 Policy 40 – Vehicle Parking Provision
 Policy 43 – Safeguarding of Aerodromes
 Policy 58 – Private Water Supplies and Water Conservation
 Policy 63 – Waste Related Development and Waste Management 
National Energy Policy Framework as a material planning consideration 
Energy Policy Framework 
Statutory and policy requirements at UK and Scottish level to mitigate climate
change and increase renewable energy generation are informed by higher level
international agreements, primarily the Paris Agreement (2015) which commits
United Nations signatory countries to take action to cut carbon emissions and
emphasises the aim of restricting temperature rises to below 2°C above
preindustrial levels. At the UK level, action to tackle climate change is underpinned
by the Climate Change Act 2008 as amended by the Climate Change Act 2008
(2050 Target Amendment) Order 2019. A range of policy documents set out the
UK Governments binding commitments to cut carbon emissions through the
deployment of renewable energy, including the UK Government’s Ten Point Plan
for a Green Industrial Revolution (2020), Energy White Paper (2020), Carbon Plan
(2011), the UK Renewable Energy Roadmap (2011) (updated 2012 and 2013) and
the British Energy Security Strategy. 
More recently the publication of Scotland’s Draft Energy Strategy and Just
Transition Plan and the accompanying Ministerial statement (Dated 10.1.23)
further reinforces the importance of achieving net zero and addressing the Climate
Emergency. 
Planning 
At a national level, planning policy relevant to the determination of the application
for consent comprises National Planning Framework 3, the Scottish Planning
Policy 2014 and the revised draft National Planning Framework 4. (which will come
into force on 13.2.23). NPF 4 will then supersede NPF 3 and SPP 2014. 
The Policies of NPF4 of most direct relevance to the current proposals are set out
below: 
1. Tackling the climate and nature crises
2. Climate mitigation and adaptation
3. Biodiversity
4. Natural places
5. Soils
6. Forestry, woodland and trees
7. Historic assets and places
11. Energy
12. Zero waste
25 Community Wealth Building 
The national policy position in both documents contains a presumption in favour of
development that contributes to sustainable development; coupled with support for
the delivery of renewable energy generation capacity, including energy storage
Page 189

Page 190

projects at a range of scales. Support for such schemes feeds into policy
consideration and guidance at all levels, in recognition of the wide range of benefits
they offer. 
NPF3 and NPF 4 identify pump storage hydro schemes (PSH) as key assets to
achieve these objectives and recognises that increasing the capacity of PSH can
complement ambitions for more renewable energy capacity. The expansion of
Cruachan is specifically cited as being amongst the most advanced plans for new
PSH schemes. 
The emerging policy position as drafted for consultation in NPF4, takes this support
further towards delivery, working from a baseline focussed on tackling climate
change and setting a target of net zero emissions by 2045, with significant progress
required by 2030. In the revised draft NPF4, under “Productive Places” the
Cruachan Expansion project is specifically listed as a Scotland Wide National
Development: 9. Pumped Storage Hydro. Ben Cruachan at Loch Awe is named as
the initial focus of the PSH capability, with an all-Scotland intention thereafter. This
will be further reinforced when NPF4 forms part of the development plan framework
on 13.2.23. 
Officers accept and ask members to note that there is robust high level
Energy/Climate Change policy and National planning policy support for the current
proposals. This is considered to be a substantive material consideration, however
this does not undermine the need for the proposals to address the other policy
objectives of NPF4 which, although supporting the proposals, requires other issues
such as biodiversity improvements, Socio Economic benefits, and “Just Transition”
to be considered in a balance of judgement on compliance with the overall
objectives of NPF 4..
___________________________________________________________________ 
Does the Council have an interest in the site: No 
(G) Is the proposal consistent with the Local Development Plan: Yes
___________________________________________________________________ 
Author of Report:   David Moore   Date:  27.1.23 
Reviewing Officer:   Sandra Davies  Date:  31.1.23 
Fergus Murray 
Head of Development and Economic Growth 
Page 190

Page 191

APPENDIX A – PLANNING LAND USE AND POLICY ASSESSMENT 
A. THE SECTION 36 CONSENTING REGIME 
In Scotland, any proposal to construct, extend, or operate an onshore electricity generating
station, in this case, a pump storage hydro, with a capacity of over 50 megawatts (MW),
requires the consent of Scottish Ministers under section 36 of the Electricity Act. Such
applications are processed on behalf of the Scottish Ministers by the Energy Consents Unit
(“ECU”) Scottish Government - Energy Consents. Section 57(2) of the Town and Country
Planning (Scotland) Act 1997 (“TCP(S)A”) also allows the Scottish Ministers, on granting
consent under section 36, to direct that planning permission for that development shall be
deemed to be granted, subject to such conditions (if any) as may be specified in the direction. 
The consultation bodies to be consulted by the Scottish Ministers on Section 36 applications
are the relevant planning authority, NatureScot, SEPA, Transport Scotland and HES and any
other relevant public bodies with specific environmental responsibilities or local and regional
competencies who the Scottish Ministers consider are likely to have an interest.  The Council’s
role in this process is therefore one of a consultee along with various other consultation bodies.
It is open to the Council to either support or object to the proposal, and to recommend
conditions it would wish to see imposed in the event that authorisation is given by Scottish
Ministers. 
In the event of an objection being raised by the Council, the Scottish Ministers are obliged to
convene a Public Local Inquiry (PLI) if they are minded to approve the proposal. They can
also choose to hold a PLI in other circumstances at their own discretion. Such an Inquiry would
be conducted by a Reporter(s) appointed by the Directorate for Planning and Environmental
Appeals. In the event that consent is given, either where there has been no objection from the
Council, or where objections have been overruled following PLI, the Council as Planning
Authority would become responsible for the agreement of matters pursuant to conditions, and
for the ongoing monitoring and enforcement of such conditions contained in any issued
“deemed planning consent”. Any decision notice would have a Part 1” List of conditions for the
ECU to discharge and a “Part 2” deemed planning permission where the Planning Authority
(often in consultation with other statutory consultees) will be required to consider and
discharge the conditions. 
This report reviews the policy considerations which are applicable to this proposal and the
planning merits of the development, the views of bodies consulted by the Scottish Government
along with other internal consultations undertaken by the Council, and 3rd party opinion
expressed to the Scottish Government following publicity of the application by them. It
recommends views to be conveyed to the Scottish Government on behalf of the Council before
a final decision is taken on the matter.   
B. SETTLEMENT STRATEGY 
Policy LDP 6 of the Adopted Local Development Plan sets out the Council’s Policy for
renewable energy developments, in accordance with SPP 2014.  In addition, there is also the
Supplementary Planning Guidance.  SPP 2 contains a Spatial Framework which has been
prepared in accordance with SPP 2014.   
In terms of the Local Development Plan Settlement Strategy, the main site is located within a
combination of, Lorn and the Inner Area very sensitive countryside, North Argyll APQ and Glen
Etive and Glen Fyne Special Protected Area, subject to the provisions of LDP policy LDP DM
1.  In principle, policy LDP DM 1 supports renewable energy and ancillary developments of
this type in these areas, providing they are consistent with all other Local Development Plan
Page 191

Page 192

Policies.  It is the conclusion of Officers that this proposal satisfies the relevant local and
national planning policy in respect to pumped storage hydro as detailed in the various sections
of this report, subject to the ECU considering the pre-determination matters and conditions
detailed in this report. 
Having due regard to the above it is considered that the proposal is consistent with the
provisions of LDP DM1 – Development within the Development Management Zones;
SPP (2014); NPF 3 and Revised Draft NPF4 
.
C. SUPPORTING THE SUSTAINABLE GROWTH OF RENEWABLES 
Argyll & Bute Council is keen to ensure that Argyll & Bute continues to make a positive
contribution to meeting the Scottish Government’s targets for renewable energy generation. 
These targets are important given the compelling need to reduce our carbon footprint and
reduce our reliance on fossil fuels, reinforced by the Climate Change (Emissions Reduction
Targets) (Scotland) Act 2019. The Council will support renewable energy developments where
these are consistent with the principles of sustainable development and it can be adequately
demonstrated that there would be no unacceptable significant adverse effects. 
Statutory and policy requirements at UK and Scottish level to mitigate climate change and
increase renewable energy generation are informed by higher level international agreements,
primarily the Paris Agreement (2015) which commits United Nations signatory countries to
take action to cut carbon emissions and emphasises the aim of restricting temperature rises
to below 2°C above preindustrial levels. 
At the UK level, action to tackle climate change is underpinned by the Climate Change Act
2008 as amended by the Climate Change Act 2008 (2050 Target Amendment) Order 2019. A
range of policy documents set out the UK Governments binding commitments to cut carbon
emissions through the deployment of renewable energy, including the UK Government’s Ten
Point Plan for a Green Industrial Revolution (2020), Energy White Paper (2020), Carbon Plan
(2011), the UK Renewable Energy Roadmap (2011) (updated 2012 and 2013) and the British
Energy Security Strategy. 
At a national level, planning policy relevant to the determination of the application for
consent comprises National Planning Policy Framework 3, the Scottish Planning Policy 2014
and the draft National Planning Policy Framework 4. 
The national policy position contains a clear presumption in favour of development that
contributes to sustainable development; coupled with support for the delivery of renewable
energy generation capacity, including energy storage projects at a range of scales. Support
for such schemes feeds into policy consideration and guidance at all levels, in recognition of
the wide range of benefits they offer. 
NPF3 identifies hydroelectric power as a key asset and recognises that increasing the
capacity of PSH can complement ambitions for more renewable energy capacity. The
expansion of Cruachan is specifically cited as being amongst the most advanced plans for
new PSH schemes and the relationship with Cruachan 1 is noted. In the draft NPF4, under
“Productive Places” the Cruachan Expansion project is specifically listed as a Scotland Wide
National Development: 9. Pumped Storage Hydro. Ben Cruachan at Loch Awe is named as
the initial focus of the PSH capability, with an all-Scotland intention thereafter. This will be
further reinforced when NPF4 forms part of the development plan in due course. 
Page 192

Page 193

The inclusion of the currently proposed Cruachan expansion in both NPF3 and NPF 4 as an
important National Planning and climate priority is acknowledged and in Officers opinion
must be regarded as a strongly supportive framework for the principle of the approving the
current proposals. 
D. LOCATION, NATURE AND DESIGN OF PROPOSED DEVELOPMENT 
Background – 
The Proposed Development will be located on land around and to the east of the existing
Cruachan pumped storage hydro power station (‘Cruachan 1’) on the northern banks of Loch
Awe.  Cruachan 1 is a pumped storage hydro-electric facility and one of four large-scale
pumped storage facilities in the UK. It currently operates with a nominal maximum output of
440 MW in full generation mode with an average annual generation output of circa 300
GWh/year. The current facility comprises the following main components: 
 Cruachan Reservoir (upper head pond); Gross storage 11.1 million m3; live storage
8.47 million m3; 
 Energy storage in upper head pond of 6.7 GWh per cycle; 
 Twin 4.6 m diameter headrace tunnels that bifurcate to four steel-lined unit penstocks; 
 Underground cavern power station housing 2 x 100 MW and 2 x 120 MW reversible
Francis pump-turbines and motor-generators; and 
 Single 6.8 m horseshoe shaped tailrace tunnel and inlet/outlet structure on the bank of
Loch Awe. 
The reservoir receives natural inflows from its 5.7 km2 direct catchment and is supplemented
by a series of indirect catchments that discharge at three principal locations around the
shoreline of the upper reservoir. 
Cruachan 1 opened in 1965. Its design by James Williamson responded to the challenge of
developing a nationally significant power station in an area renowned for scenic beauty with
two monumental and pioneering pieces of civil engineering. The turbine hall is concealed deep
underground, minimising the visual impact of the scheme, whilst the buttressed dam, sitting
back from the entrance to Coire Cruachan, appears almost a part of the landscape, the angle
of the buttresses being close to that of the adjacent slopes. All the operational equipment is
contained within the dam to negate the need for towers 
The Site -. 
The Site encompasses the existing Cruachan 1 facilities, including Cruachan Reservoir, the
underground power station, and the visitor centre. Existing private and public roads which
connect the A85 to Cruachan Reservoir (including St Conan’s Road), a small section of the
A85, Falls of Cruachan railway station, part of the Oban to Glasgow railway line, and parts of
Loch Awe also lie within the boundaries of the Site. 
Cruachan Reservoir, which provides the upper reservoir of Cruachan 1, is located within a
natural coire on the southwest facing slope of Ben Cruachan. The reservoir is impounded by
a concrete mixed gravity and buttress dam across the natural outlet to the Allt Cruachan Burn.
A path around the reservoir is part of the route used by the public to access the summit of Ben
Cruachan. 
A more detailed description of the site and surroundings is contained within the EIAR at
Chapter 2 
Page 193

Page 194

The Proposal 
The Proposed Development seeks to optimise use of the existing Cruachan Reservoir and
Dam through development of a new underground power station and associated infrastructure
adjacent to Cruachan 1 to provide up to 600MW of additional new generating capacity. The
Proposed Development will be operated independently of the existing 440 MW Cruachan 1.
Both power stations will use Loch Awe as the lower reservoir and Cruachan Reservoir as the
upper reservoir.  The construction process will take place over an estimated 65-month
programme to achieve commercial operation of the first generating unit.   
A full description of the main elements of the Proposed Development is provided in the EIAR
Volume 1 at Chapter 3 and at Section A of this report. The submitted EIAR contains
information and technical appendices in respect of the following matters: 
 Flood Risk Assessment; 
 Loch Awe Water Levels Report; 
 Species Reports: Bat, Otter, Ornithology, Fisheries, Badger, Red Squirrel, Pine Martin; 
 Ecological Constraints Plan; 
 Habitats Regulation Assessment; 
 Transport Assessment; 
 Draft Construction Traffic Management Plan; 
 Noise Monitoring; 
 Draft Peat Management Plan; 
 Cultural Heritage Assessment; 
 Listed Buildings Consent; 
 Draft Construction Environmental Management Plan; 
 Schedule of Mitigation; 
 Planning Statement; 
 Design Statement; and 
 Statement of Consultation and Engagement. 
A major component of the Proposed Development is the generation of spoil from excavation
of new tunnels and the powerhouse cavern during construction. The construction of the
proposed development is anticipated to generate up to 2.30 million tonnes of excavated rock 
over the 5.5 -year construction period (2024-mid of 2029). An average of 1,600 tonnes per
day with peak generation of c. 3,000 tonnes per day. The excavated materials will be in the
form of rock ‘chippings’ ranging from boulders to fines produced by drill and blast techniques. 
Approximately one fifth of this material (0.45Mt) will be re-used on Site. Therefore, there will
be a residual volume of 1.85 Mt of spoil which will require to be removed off-site for use
elsewhere. 
The primary re-use for spoil on site will be the quayside structure in Loch Awe. It has a depth
of about 12 m and a length of 510m. It will require approximately 162,500 tonnes spoil, 21,700
tonnes which will be imported to form the initial tunnel access and 140,800 tonnes will be from
excavated materials produced in forming the access tunnel. 
The EIAR further confirms that up to 15,000 tonnes spoil will be stored on the quayside
structure at any one time, prior to removal by road. The material would be stored under a
temporary canopy structure, enclosed on three sides which would prevent runoff and wind-
blown silt from entering Loch Awe. 
The applicants have confirmed that for assessment purposes this EIAR has assumed a worst
case that 100% of residual spoil is transported by road both to the east and west on the A85
Page 194

Page 195

and that the potential likely significant effects of spoil movement have been covered in more
detail throughout the EIA Report, and specifically in Chapters 7 – Hydrology, 9 – Traffic,
Transport and Access, Chapter 10, Noise and Vibration, and Chapter 14 – Waste
Management. 
Approximately 9ha of compound area will be required close to the Site. This will most likely be
within an area of land to the east of the project, to the north of the B8077, close to Castles
Farm. 
Having due regard to the above the proposals scale of contribution to renewable energy
generation targets has been assessed and it is concluded that the proposal is
consistent with the provisions of National Energy Policy SG 2; Supplementary LDP
STRAT 1 – Sustainable Development; LDP DM1 – Development within the Development
Management Zone; LDP 6 - Supporting the Sustainable Growth of Renewables; SPP
(2014); NPF 3 and Revised Draft NPF4 Policies 1,2 and 11 
E. IMPACTS ON COMMUNITIES AND INDIVIDUAL DWELLINGS, INCLUDING RESIDENTIAL
AMENITY, and NOISE (INCLUDING CUMULATIVE IMPACTS). 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against
impacts on communities and individual dwellings, including visual impact, and noise. 
The EIAR  has identified potentially sensitive visual receptors within the study area comprise
residents or others present in and around buildings and settlement areas, those using routes
(including transport and recreational routes) through the study area, and those obtaining views
from outdoor locations where enjoyment of the view is one of principle reasons for being at
the location. 
Residential Receptor Locations (RRLs) are identified and described in detail in Technical
Appendix 11.2 of the EIAR and their locations are shown on Figure 11.4. The EIAR identifies
these receptor locations as contained in four general areas:  
 To the east of Loch Awe;
 Along the northern shoreline of Loch Awe;
 To the west of Loch Awe; and
 Along the southern shoreline of Loch Awe. 
23 building-based receptor locations were included in the visual assessment (as set out at
Figure 11.4), comprising individual buildings or groups of buildings, and associated outdoor
spaces where a view of the Proposed Development would potentially be obtained. 
The assessment (see Technical Appendix 11.2) has identified that the majority of effects to
receptors would be not significant. During construction, temporary significant effects were
identified for three of these receptor locations with visual receptors in all other locations
identified as likely to experience effects which would be not significant In respect of the main
and permanent works to create the underground turbine hall and associated above ground
permanent structures near the dam. 
Officers are in general agreement with these evaluations and do not consider that any
unacceptable amenity impacts upon settlements or individual properties will occur after the
construction stage of the proposals have finished. Clearly temporary impacts associated with
construction works will be of a greater magnitude and the construction compounds and new
quayside loading area will require to be designed and landscaped in a manner which
Page 195

Page 196

minimises transient impacts upon the area which is both attractive and well used by tourists. 
The EIAR contends that during operation, views from all building-based receptor locations
would be not significant, because the levels of activity and footprint of the Proposed
Development would be reduced, and proposed reinstatement and mitigation measures would
lead to permanent features appearing less noticeable and detracting in views. The detailed
assessment of all building-based visual receptor locations during the operational phase is
included in Technical Appendix 11.2. Officers are in agreement with these conclusions. 
Officers accept that although some significant visual impacts will occur from some vantage
points, and as accepted in the EIAR, these will not be significant in respect of the operation
of the facility once the construction phase has finished. It is accepted by officers that a
proposals of this scale and complexity cannot be built without some temporary adverse
impacts as is often the case with construction activities. However it is important to ensure that
construction activity impacts are controlled in an appropriate manner to minimise any impacts
on surrounding sensitive receptors 
A construction Environmental Management Plan will be finalised and submitted to ensure
best practice during construction and in addition The Council’s Environmental Protection
Officer has recommended the following conditions be placed on any consent. 
Noise and Vibration 
The noise and vibration survey identified 15 Noise and Vibration Sensitive Receptors. The
sensitivity of 11 of the 15 identified receptors has been classed as high, 10 of which are
residential sites. 
The Environmental Impact Assessment Report Volume 1 – Main Report May 2022 states that
‘surface work is expected to take place Monday – Saturday 7am -7pm and Sundays 7am –
12pm with underground works expected to take place 24 hours a day’ 
With the number of noise and vibration sensitive receptors in the vicinity of the site, I would
suggest the following condition: 
“Surface work and underground work should be restricted to:  
• Monday to Friday: 0700 hours until 1900 hours. 
• Saturday: 0700 hours until 1700 hours. 
• Sunday / Public holidays: – no works, except for servicing and maintenance of plant
and equipment and emergency work. 
Reason: In order to protect the amenities of the area from noise and vibration nuisance
and to minimise local community annoyance” 
It is understood that a project of this magnitude may require some construction activities to
be take place outside of these hours. Environmental Health will consider all applications for
construction activities outside of these hours and will remain flexible (without detriment to the
local residents) throughout the project. 
Private Water Supplies 
The Environmental Impact Assessment Report Volume 1 – Main Report May 2022 identified
‘17 private water supplies located within a 5km buffer of the Proposed Development. Multiple
properties are served by the supplies which are considered to be of very high sensitivity’ 
In order to protect the identified private water supplies and the residents reliant upon
these supplies; Environmental Health request that detailed information be provided on
Page 196

Page 197

how these 17 private water supplies will be protected during the construction and
operation phases of the proposed development. 
Reason – in the interest of public health and to ensure adequate measures are in place
to protect the identified private water supplies 
Lighting 
Artificial lighting will be used during the construction phase of the proposed development.
Mitigation measures have been identified in the Draft Construction Environment Management
plan. Environmental Health would be satisfied as long as the mitigation measures identified
are implemented. 
Similar, mitigation measures should be identified and implemented for the operational phase
of the proposed development. 
Dust 
The Draft Construction Environment Management plan has identified activities associated
with the potential to generate dust. Specific control measures have been identified to ensure
the employment of best practical means to minimise the risk of adverse effects from
construction dust. 
Environmental Health would be satisfied as long as the specified control measures identified
are implemented. 
In terms of the design appearance of the new quayside shown in photomontages contained
at (Figure 11.8 (a-d)) from the opposite side of Loch Awe near Tervine and from open water
in the vicinity of the site, Officers consider that further details on the construction and
appearance of the quayside require to be provided to investigate whether a softer and more
natural appearance can be achieved than the somewhat stark and industrial finish indicated.
As this is intended to be a permanent structure (notwithstanding that it is accepted that at this
point the visitor centre and other engineered and man-made features can be found) it is
important that best design and construction practice are used to minimise visual impact and
maximise the opportunity to provide a more natural appearance from open water in particular
as this is a popular location for water based recreational activities. 
It is therefore proposed that a condition requiring further details of the design /appearance of
the quayside feature and buildings be imposed to ensure that visual impacts are minimised,
and biodiversity opportunities through soft engineering solutions are maximised in design and
construction detail of this feature is required. 
Officers also consider that although the main construction compound will be temporary this
will still be large and potentially prominent in the landscape and in a localised context and it
is essential that the compound minimises impact and integrates, in so far as is possible, into
the landscape and also that restoration after use of the land also seeks to take on board the
requirements of NPF 4 in respect of seeking biodiversity improvements. A condition to secure
these objectives is also proposed
In respect of potential noise impacts Environmental protection officers have evaluated the
potential amenity impacts from the proposals and are content that subject to the imposition of
appropriate conditions these matters can be mitigated for the duration of the construction
period. The long term operation of the facility is not considered to raise any amenity issues for
residents.
Having due regard to the above subject to the recommended conditions being applied
in the event that consent is granted by the ECU it is concluded that the proposal will
Page 197

Page 198

not have any adverse impacts on communities and individual dwellings, including,
residential amenity, noise and subject to the recommended conditions is consistent
with the provisions of SG 2 Renewable Energy; LDP STRAT 1 – Sustainable
Development; LDP DM1 – Development within the Development Management Zone;
LDP 3 – Supporting the Protection, Conservation and Enhancement of our
Environment; LDP 6 - Supporting the Sustainable Growth of Renewables; LDP 9 –
Development Setting, Layout and Design and SPP (2014); 
F. LANDSCAPE AND VISUAL IMPACTS, INCLUDING EFFECTS ON WILD LAND
(INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for wind turbine developments to be assessed against any
landscape and visual impacts including wild land.   
In respect of these matters Volume 1 Chapter 11 of the main EIA report sets out in detail the
evaluation of the proposals by the applicant. This chapter and its conclusions are supported
by the following figures and appendices: 
 Technical Appendix 11.1: Figures including: 
 Figure 11.1: Zone of Theoretical Visibility; 
 Figure 11.2: Designated and Protected Landscapes; 
 Figure 11.3: Landscape Character; 
 Figure 11.4: Visual Receptors; 
 Figure 11.5: Indicative Landscape Mitigation Proposals; 
 Figure 11.6: Developments included in the Cumulative Assessment; 
 Figure 11.7 (a-d): Visualisation of Proposed Upper Intake Structure from Cruachan
Reservoir Track; 
 Figure 11.8 (a-d): Visualisation of Proposed Quayside Structure from above Tervine;
and 
 Technical Appendix 11.2: Visual Receptor Assessment. 
Policy SG LDP ENV 14 in respect of Landscape and Policy LDP3 of the adopted Argyll and
Bute Local Development Plan 2015 comprise the principal policies of relevance to landscape
and visual evaluation of the Proposed Development. The aim of this policy is to protect,
conserve and where possible enhance the built, human, and natural environment. Policy LDP3
also notes that a development proposal would not be supported where adverse effects,
including cumulative effects on the integrity or special qualities of international or nationally
designated sites; or, significant adverse effects, on the special qualities or integrity of locally
designated natural and built environment sites, would occur. 
In addition, Policy LDP9 concerns the design and setting of development, requiring
development to be sited and positioned to pay regard to the context, and be compatible with
the surroundings, particularly within sensitive locations including National Scenic Areas, Areas
of Panoramic Quality or Gardens and Designed Landscapes. 
 Woodland, green networks and wild land; 
 The established character and local distinctiveness of the landscape; and 
 The established character of the built environment in terms of its location, scale, form,
and design. 
Policy LDP3 is supported by various Supplementary Guidance with more specific regard to
other landscape and visual considerations including: 
Page 198

Page 199

 SG LDP ENV 6 Development Impact on Trees / Woodland; 
 SG LDP ENV 9 Development Impact on Areas of Wild Land; 
 SG LDP ENV 12 Development Impact on National Scenic Areas (NSAs); 
 SG LDP ENV 13 Development Impact on Areas of Panoramic Quality (APQs); 
 SG LDP ENV 14 Landscape; and 
 SG LDP ENV 15 Development Impact on Historic Gardens and Designed Landscapes. 
The following designated landscape areas and other areas protected through planning policy
fall within the study area, as shown on Figure 11.2 of Appendix 11.1 of the EIA. 
National Designations 
 Wild Land Area (WLA) 09. Loch Etive Mountains; and
 Ardanaiseig House Inventory Garden and Designed Landscape (GDL). 
Regional Designations 
 North Argyll Area of Panoramic Quality (APQ). 
Members are requested to note that LDP2 changes the name of Areas of Panoramic Quality
(APQs) identified in the Argyll and Bute Local Development Plan (2015) to Local Landscape
Areas. However, there is no change to the boundary of the North Argyll APQ which covers the
LVIA study area defined in the application documents. 
The applicants have provided separate Zone of Theoretical Visibility information  (ZTVs) for
the proposed Development indicating theoretical visibility of the upper intake structure and
quayside and are shown on Figures 11.1.The  ZTVs have been produced using the following
assumed heights of features: 
 Upper intake – Gate hoist structure at 13m above proposed ground level; and 
 Quayside – Three operational buildings at 4.5m above proposed ground level. 
The Proposed Development would be located on the northern shoreline and upper hills to
the north of Loch Awe. Loch Awe is a long, linear Loch with a south-west / north-east
orientation, but with an additional arm reaching westwards at its northern end towards the
Pass of Brander where the existing Cruachan 1 is located. 
The high craggy summits of Ben Cruachan and surrounding mountains rise steeply above
this part of the loch shore and dominate the surrounding area whilst elsewhere, smaller
scale landscapes of woodland, farmland and settlement characterise the loch-shore and
surrounding straths, backed by a rugged landscape with a broad-scale pattern of moorland
and commercial forestry. 
The existing Cruachan concrete buttress Dam forms a striking feature within the mountain
setting to the north of the Pass of Brander, and can be seen from many areas within the
wider landscape context. Features of Cruachan 1 are also present on the shore of Loch Awe
at the Pass of Brander, but are relatively discrete, being set within trees. 
In respect of landscape visibility and potential impacts visibility the applicants submit that: 
Page 199

Page 200

11.6.16 Theoretical visibility of the proposed quayside is shown to be relatively localised
within and around the arm of Loch Awe leading to the Pass of Brander. At the mouth of
this arm of the loch, potential visibility is also shown to be funnelled across Loch Awe
towards the south-eastern shore around Inistrynach, Bovuy and Achlian, and across
the upland moorland and forestry area to the south-east up to around 7.5 km from the
proposed quayside. 
11.6.17 Theoretical visibility of the proposed upper intake structure is shown to be
largely contained within Coire Cruachan by the ridges and summits of the mountains
that surround it. More distant potential visibility is shown across areas to the south of
this with patchy areas of ZTV coverage around areas such as Ardanaiseig and Hayfield
to the north of the main body of Loch Awe, and more consistent coverage across the
loch and the southern shore across areas around Ardbrecknish and Keppochan as well
as the hills beyond. 
11.6.18 Site survey to verify the ZTV suggests that in most cases, woodland and local
landform would limit actual visibility of these structures within the areas indicated,
particularly around Loch Awe, and the existing Cruachan Dam would reduce visibility of
the proposed upper intake structure from the south. The most consistent areas of
intervisibility with the Proposed Development would therefore be likely to be within
areas where woodland is limited, including views across the open waters of the loch,
typically featuring the proposed quayside, and within the upland and mountainous
areas, particularly around Coire Cruachan above the existing dam, where the proposed
upper intake structure would be located. 
The EIAR confirms that evaluation of potential impacts have been undertaken from public
transport routes and recreational routes. Residential Receptor Locations (RRLs) are described
in detail in Technical Appendix 11.2 and their locations are shown on Figure 11.4. 
The EIAR states that Landscape and visual issues have been a consideration throughout the
design process for the proposed development and that the following embedded design
principles have been adhered to in order to reduce potential landscape and visual effects
where possible. 
 The location of the majority of the proposed development underground; 
 Considered positioning of permanent, above-ground features to minimise landscape
and visual effect and optimise the opportunity for additional mitigation measures; and 
 Minimising the permanent design footprint as far as is possible including the scale of
required rock cuttings and requirements for woodland removal, particularly woodland
included on the Inventory of Ancient and Long-established Woodland. 
The applicants also confirm that embedded mitigation measures would also include habitat
and landform reinstatement which would be integral to the restoration of areas disturbed
during construction. The reinstatement of areas disturbed during construction would be
fundamental to ensuring that the proposed development would be successfully
accommodated into the existing landscape. This would be achieved through a combination of
natural regeneration in sensitive upland habitat areas (refer to Appendix 3.1: Construction
Environmental Management Plan), seeding where required and planting of appropriate
woodland species to promote biodiversity as well and landscape integration. 
Around the main permanent structures at the upper and lower control works, native woodland
Page 200

Page 201

planting is proposed to help soften the appearance of new features and compensate for trees
and woodland lost through construction activities. The applicants contend that: 
 At the upper intake: Softening of the appearance of the rock cut areas though
mounding of stored top soils / peat at the base of the cut and planting of upland
woodland species (e.g. birch, rowan and willows), supplemented by the
encouragement of natural vegetation growth at the base of the cutting and on benches;
and 
 At the quayside: Softening of the appearance of the new quayside walls with strategic
replacement of stored soils on the quayside and planting with native woodland and
scrub species reflective of those within the nearby Coille Leitre SSSI. The locations of
such areas would be dependent on the operational requirements of the quayside 
 During operation, no changes would be likely to be perceived relating to the upper
works within the mountainous context. Therefore, potential change would be limited to
the permanent quayside and other associated features such as buildings and tunnel
portal. This would continue to form a perceptible change within this localised part of
the landscape as it would result in a new section or artificial shoreline and built
development in this area. However, this would occur within an area where the existing
Cruachan 1 power station, Tervine fish farm and the A85 already lead to some similar
features and the surrounding wooded character would reduce these changes to the
localised context. Woodland planting on the quayside area would help to reduce the
perceived level of change over time. 
Having examined the submissions in respect of such matters Officers are of the opinion that
the longer term operational landscape and amenity impacts of the proposals are acceptable
and accordance with Policy requirements subject to appropriate Landscaping, Biodiversity,
Habitat and Peat management plans being produced to progress the detail of such measures
Conditions on these matters are proposed. 
It is accepted by officers that the scale and magnitude of impacts will be far greater on a
temporary basis during construction than associated with the longer term operation of the
facility. However officers consider that the greater transitional landscape and visual impacts
during construction would not be a justification for raising objection to these proposals. 
Having due regard to the above subject to the recommended conditions it is considered
that the landscape and visual impacts (including cumulative) are acceptable and the
proposal is consistent with the provisions of: SG LDP ENV 13 – Development Impact
on Areas of Panoramic Quality; SG LDP ENV 14 –Landscape; SG 2 Renewable Energy;
LDP STRAT 1 – Sustainable Development; LDP DM1 – Development within the
Development Management Zone; LDP 3 – Supporting the Protection, Conservation and
Enhancement of our Environment; Policy LDP 6 – Supporting the Sustainable Growth
of Renewables; LDP 9 – Development Setting, Layout and Design;  of the Argyll & Bute
Local Development Plan; SPP (2014); NPF 3 and Revised Draft NPF4 Policy 14 
G. EFFECTS ON NATURAL HERITAGE INCLUDING BIRDS 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for wind turbine developments to be assessed against any
impact they may have on natural heritage including birds. 
Page 201

Page 202

The applicants have confirmed in Volume 1 Section 8 of the EIAR that in order to evaluate the
potential ecological sensitivities associated with the Site, a desk study was conducted in
advance of the field surveys. This included a review of: 
 Ecological and ornithological surveys undertaken within the Site boundary or its
environs since 2016; 
 Existing data on statutory designated sites available through NatureScot Sitelink
website for statutory designated sites up to 10 km from the Site; 
 Records of Ancient Woodlands available from NatureScot (up to 2 km from the Site); 
 The SBL; 
 Argyll and Bute Council has designated non-statutory nature conservation sites, and
such sites within 2 km from the Site were extracted from the Argyll and Bute Council
Local Development Plan; and
 Other pre-existing biological data relevant to the Site were also searched for in online
databases to which the authors had access and for which there were no copyright
issues associated with their use in a commercial setting. 
The EIAR conclusions have also been informed by a series of technical field studies, as
described in Technical Appendix 8.1. In summary, the surveys included: 
 Habitats, including GWDTEs and those listed as Annex 1 Priority Habitats, and notable
flora, including Invasive Non-Native Species (INNS);
 Otter;
 Water vole;
 Badger;
 Red squirrel;
 Pine marten;
 Bats;
 Vantage point surveys for target raptor species;
 Breeding birds;
 Black grouse;
 Electrofishing surveys for fish;
 Spawning habitat surveys (for salmonid fish);
 Kick and sweep surveys for macroinvertebrates, and
 Aquatic macrophytes. 
The potential impact on protected Woodland habitats associated with the Loch Etive Woods
SAC and SSSI was the reason for NatureScot and the Councils Biodiversity Officer to both
respond with a holding objection to the original EIAR submissions. Concerns over the potential
impact of widening the access track as part of the construction process have been successfully
addressed and by e-mail dated 25.10.22 the applicants clarified that: 
Further to our site visit last month and your request for further clarifications I am pleased
to attach the following for your information. 
1) Marked up technical drawings (as used on site visit) to show more clearly the existing
deer fence and SAC boundary, as these relate to the proposed widening works. We
agreed on site that, in practice, the SAC boundary would be aligned tightly to the southern
edge of the existing metalled road.
2) Provision of cross sections at key points, to show how widening and earthworks would
sit in the topography. On site we agreed that at this bend, where topography drops away
quite quickly, it would be useful for you to see how this encroachment into the SAC may
Page 202

Page 203

look in profile. The previous commentary provided (see Q2 response in email trail below)
regarding the stabilisation technique still applies.
3) Updated SAC impact report, including updated habitat loss calculations, based on the
SAC boundary being aligned to the edge of the metalled road. As discussed on site, there
will be a small encroachment into two areas where there is existing tree (birch) cover. The
area of this encroachment has been calculated, in total along the whole length of the
works, at 210m2. The precise number of trees that could be lost as a result of the widening
works is not yet known. Once a contractor is on-board and we know their precise
construction methods and requirements we can be precise about what, if any, impact
there will be on existing trees. 
We trust that these clarifications will assist in your consideration and allow you to remove
your holding objection. 
The submission of the FEI at parts 5-7 and information enclosed therein on 14 December 22
has addressed these concerns and both holding objections have now been removed subject
to conditions ensuring more detailed submissions are made for approved to assist finalising
the design of the access track upgrades. RSPB are also satisfied with the proposals as set
out in their consultation response. 
In response to a request for additional clarification on felling and potential impact on woodland
by Scottish Forestry the applicants confirmed within FEI Part 8 that: 
For the avoidance of doubt, there is no proposed loss of woodland and therefore a
standalone woodland and forestry chapter has not been prepared as part of the EIA.
Effects and impact on trees have however been assessed in Chapter 8 Ecology, and
Chapter 11 Landscape and Visual Amenity. 
Impact on woodland has been considered in Chapter 8 Ecology. To inform that chapter,
a desk study was undertaken to anticipate potential ecological sensitivities associated
with the site. This included reviewing records of ancient woodland (up to 2km from the
site) and a review of statutory designated sites available through NatureScot Sitelink. That
review identified woodland habitats present along the access track corridor only and not
at either the lower works or the upper works. Table 8.9 summarises the likely construction
phase impacts and effects on the Loch Etive Woods SAC, Coille Leitire SSSI and Ancient
Woodland. Effects are from works to widen the dam access track, and for all works no
significant effects are predicted. 
A key premise of the proposed development is, where possible, the retention of existing
trees to help limit the visual appearance of construction works and proposed features,
particularly woodland included on the Inventory of Ancient and Long Established
Woodland. This is covered in Chapter 3 at paragraph 3.3.6. As detailed designs of the
proposals are developed more information about individual tree loss and planting as part
of any landscaping proposals will become available and we will be happy to share and
discuss these with you 
Scottish Forestry are content with the proposals and raise no objections as set out in their
consultation response. 
In respect t of the responses from Marine Scotland and the Council’s Marine Officer, they are
both content with the proposals and raise no objections. 
No objections have been raised by any of the external or internal consultees on ecological,
habitat or marine ecology matters subject to the imposition of appropriate conditions by the
Scottish Ministers.
Page 203

Page 204

Having due regard to the above it is concluded that subject to the conditions
recommended by NatureScot, Marine Scotland, SEPA, Scottish Forestry and the
Council’s Local Biodiversity Officer and Marine Officer the proposal is acceptable in
terms of natural heritage, the marine environment and birds and is consistent with the
provisions of SG LDP ENV 1 – Development Impact on Habitats, Species and Our
Biodiversity (i.e. biological diversity); SG LDP ENV 7 – Water Quality and the
Environment; SG 2 Renewable Energy; LDP STRAT 1 – Sustainable Development; LDP
DM1 – Development within the Development Management Zone; LDP 3 – Supporting
the Protection, Conservation and Enhancement of our Environment; Policy LDP 6 –
Supporting the Sustainable Growth of Renewables of the Argyll & Bute Local
Development Plan; Government (January 2017); The Scottish Government’s Policy on
‘Control of Woodland Removal’ (Forestry Commission Scotland 2009); NPF 3 and
Revised Draft NPF4 Policies 3, 4 and 6 
H. IMPACTS ON CARBON RICH SOILS, USING THE CARBON CALCULATOR (INCLUDING
CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, Supplementary Guidance
2 and SPP require applications for renewable energy developments to be assessed against
any impact they may have on carbon rich soils, using the carbon calculator. 
The EIAR, volume 1 at chapter 6 addresses these matters under a general heading of “ground
conditions”. SEPA have raised issues in respect of potential Peat impacts, mostly related to
the large construction compound area which is proposed to be located in an area with
identified peat (including deep peat). They have requested the ECU to place a condition on
any grant of consent requiring further information on the design and layout of the compound
and access tracks, with a specific requirement for a peat management plan to be submitted
and approved prior to works commencing. SEPA also wish not only restoration solutions to be
provided, but also opportunities through proposed management to improve the peatland in the
area. This after use of the construction compound is agreed to be an important matter which
requires to be both sensitively and effectively addressed in further submissions related to both
the operational phase of the compound and the restoration phase. 
Officers are in agreement with SEPA on the need for both a peat management plan to be
provided, but also for opportunities to improve the peatland/habitat in the general area of the
construction compound and other construction areas to be investigated. Conditions to this
effect have been requested by SEPA. 
Having due regard to the above, subject to the recommended conditions it is concluded
that the proposal will not have an adverse impact on carbon rich soils, using the carbon
calculator and is therefore consistent with the provisions of SG LDP ENV 1 –
Development Impact on Habitats, Species and Our Biodiversity (i.e. biological
diversity); SG LDP ENV 11 – Protection of Soil and Peat Resources; SG 2 Renewable
Energy; LDP STRAT 1 – Sustainable Development; LDP DM1 – Development within the
Development Management Zone; LDP 3 – Supporting the Protection, Conservation and
Enhancement of our Environment; Policy LDP 6 – Supporting the Sustainable Growth
of Renewables of the Argyll & Bute Local Development Plan; SPP (2014); NPF 3 and
Revised Draft NPF4 Policy 5 
I. PUBLIC ACCESS, INCLUDING IMPACT ON LONG DISTANCE WALKING AND CYCLING
ROUTES AND THOSE SCENIC ROUTES IDENTIFIED IN THE NPF (INCLUDING
CUMULATIVE IMPACTS) 
Page 204

Page 205

Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against any
impact they may have on public access, including impact on long distance walking and cycling
routes and those scenic routes identified in the NPF. 
The Council’s access manager has provided a lengthy consultation response which raises no
objections to the proposals. However it is noted that an access plan has been requested and
it is agreed that this is necessary in order to ensure that access to local footpaths and visitor
facilities are not unnecessarily impacted. The EIAR submission confirms that access to the
Dam Structure and the road to it, which is widely used by visitors will remain open however
an access plan/strategy will gave the advantage at looking at the potential impacts on wider
access issues to ensure that there remain widespread opportunities for informal recreational
access to the hills and other popular locations. 
It is therefore considered that a wider access strategy is required to accompany the access
plan, and this should also explore potential improvements to footpaths in the area as a
community and tourism benefit associated with the proposals. Indeed some materials
extracted may potentially capable of re-use in the local area for footpath improvement. Officers
will explore these opportunities with the applicants should consent be granted as part of an
Access Plan and Strategy and a condition to this effect will be requested to be imposed. 
Having due regard to the above it is concluded that the proposal will not have  any
adverse physical impacts on public access, including impact on long distance walking
and cycling routes and those scenic routes identified in the NPF and is therefore
consistent with the provisions of SG 2 Renewable Energy, SG LDP TRAN 1 – Access to
the Outdoors; LDP STRAT 1 – Sustainable Development; LDP DM1 – Development
within the Development Management Zone; LDP 3 – Supporting the Protection,
Conservation and Enhancement of our Environment; Policy LDP 6 – Supporting the
Sustainable Growth of Renewables of the Argyll & Bute Local Development Plan; SPP
(2014); NPF 3 and Revised Draft NPF4 Policy 21 
J. IMPACTS ON THE CULTURAL HERITAGE, INCLUDING SCHEDULED MONUMENTS,
LISTED BUILDINGS AND THEIR SETTINGS (INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against any
impact they may have on the historic environment, including scheduled monuments, listed
buildings and their settings.   
In respect of the current proposals there are three main listed features which require to be
considered: 
 The Turbine Hall and associated infrastructure (Category A) 
The Turbine Hall is of high historic cultural significance for the role it played in the
technological development of hydroelectric power and the post-war energy programme
of Scotland. In 1965, when construction was completed, the asset was the first
example of a reversible turbine pumped storage plant in Britain. This development was
significant for British power generation as it improved energy efficiency; with the power
station being able to store otherwise wasted energy produced in off-peak hours to
instead be used when it was most needed. The construction of a power station of this
scale, underground, and utilising pumped storage was ‘pioneering’ and paved the way
for similar schemes elsewhere in the world. The hall was designed by James
Williamson and Partners and is noted in the listing as being ‘typical of their approach’
Page 205

Page 206

which was defined as being innovative and forward thinking. Williamson and Partners
became synonymous with the North of Scotland Hydro Electric Board (NoSHEB) 
The receptor holds high architectural significance for its distinctive 1960s interior
design, featuring a timber mural by the artist Elizabeth Falconer. The turbine hall is
36m high by 90m long and features several design features dating from the 1960s,
including the timber mural, lighting and use of timber and concrete throughout. The
designation notes the following features specifically: • Viewing gallery to NE corner, •
Concrete lined vaulted roof, • Supported track and gantry cranes, • Tiled Floor • Timber
mural by Elizabeth Falconer, • Timber panels and acoustic baffling panels of concrete,
geometric shapes, • Projecting window to control room, • Large overhead lighting
panels 
 The Falls of Cruachan Railway Viaduct (Category A) 
As a Category A listed building, the viaduct, is a receptor of high sensitivity. The
significance of the receptor is derived from its architectural and historic interest, as a
result of its innovative form and its role in improving rail connections with Argyll. The
viaduct is the first on a British railway to have arches made from mass concrete, an
innovation which would greatly improve the ability of 19th century engineers to create
long stretches of viaducts. The viaduct forms part of the Callander and Oban Railway
which, constructed between 1866 and 1880, greatly improved connections into Argyll
and brought significant benefits to the previously isolated western region. 
The viaduct is also a fine example of 19th century rail infrastructure, described in the
designation as comprising of three concrete arches sitting upon bull-face stone piers.
The top of the viaduct has a crenelated parapet and a 21st century safety rail. There
is a string course along the base of the parapet and the central crenulation is raised
with a crest of arms. It forms a group with the nearby Cruachan Dam and Turbine Hall
as part of a series of large-scale interventions into the surrounding landscape setting. 
The viaduct is located to the north of the A85 and spans across a stream running down
the southern slopes of Ben Cruachan. The railway line sits within a small area of
wooded landscape at the foot of the mountain. The surrounding area makes a positive
contribution to the setting, with the surrounding natural scenery creating an attractive
backdrop. To the south of the asset is the A85, the potentially negative impact of the
road is largely mitigated by intervening vegetation, blocking views and noise even in
winter, and its position lower down the mountain. 
The proposals do not include any direct works that would affect the sensitivity or
significance of the Viaduct, as such any impact would arise through the introduction of
new built form within its setting. During the construction phase there would be
construction activity in and around the viaduct, including the temporary diversion of the
A85 to facilitate construction works. This Likely Significant Effects 2 diversion would
remain in place for 2-4 months during the construction of the initial section of the new
main access tunnel. Given that this would utilise an existing ‘lay-by’ feature within the
highway, it is not considered that this element of the proposals would result in any
permanent or longer term impact on the significance of this receptor. 
 The Cruachan Dam Structure (Category B) 
The immediate setting of the dam makes a positive contribution to its heritage
significance, creating a highly attractive natural setting, comprising of the reservoir
which feeds the power station below. The landscape surrounding the dam includes the
Page 206

Page 207

mountains of Meall Cuanail to the west and Beinn a Bhuiridh to the east. The dam
appears as a manmade intervention within an otherwise scenic backdrop. The wider
setting of the asset is largely similar to its immediate setting; there is a lack of
development, and the area is largely natural. 
The dam sits within the Ben Cruachan mountain range. The peaks of the mountain
range create a horseshoe around the dam with the valley sloping southwards to Loch
Awe. The valley south of the asset contains some surface features associated with the
power station, such as a road and electrical substation. However, the smaller scale of
these features in the larger setting mean that it does not detract from the experience
of the asset. The weathered concrete exterior of the asset is complimented by the
exposed rock of the mountain, improving the ability for one to appreciate its
architectural form. 
The proposals include the creation of a new upper intake, to the south-east edge of
the reservoir, approximately 110m north of the dam. During construction, it is proposed
to construct the intake within a temporary dry well and the rock cutting will be
undertaken using a combination of blasting and rock support. This will then become a
permanent feature which must be considered in respect of its potential impact upon
the setting of the dam. 
The applicants in their FEI submissions of 14.12.22 clarify that: 
For detailed plans relating to the Section 36 application, please refer to the original
submission documents. Details of embedded mitigation are set out in detail within the EIAR
Cultural Heritage Chapter 12. In summary, these include: o Landscape design to the
proposed upper intake, o The preparation of a Construction Environmental Management
Plan (CEMP), a draft of which was included in the original EIAR. 
Following receipt of comments from HES and a site visit on 6 September 2022, further
detail has been provided in the following documents, enclosed at Appendix 5. • Cruachan
2 – Upper Intake and Dam Memorandum, Nov 2022 • Cruachan 2 – Access Tunnels
connecting Powerhouse and MAT Memorandum, Nov 2022 Likely Significant Effects
34289A5/P1/LK/ Page 13 December 2022 
A separate Listed Building Consent application is to be submitted for creation of the two
new access tunnels and the associated works that directly impact the listed Turbine Hall 
The proposed quayside would be a permanent change within the setting of the Category A
listed Turbine Hall, through the introduction of new structures within proximity of the main
access tunnel entrance. Once operational, the quayside would feature an administrative and
storage buildings which are required to facilitate ongoing operation and maintenance of the
expanded power station. Officers consider that conditions can be used to control the final
appearance of these buildings. 
The proposed quayside will be located below the existing embankment to Loch Awe, to the
east of the existing access tunnel. As a result of the topography and position of the quayside
and associated structures, these elements of the proposal will not result in any meaningful
change to the way in which the main entrance tunnel will be experienced within the landscape.
The applicants contend that; “This element of the proposal would give rise to a negligible
impact to the significance of the listed building.” Officers are in agreement with this view. 
Historic Environment Scotland (HES) (No response) 
No response has been placed on the ECU Website at time of writing this report, 
Page 207

Page 208

The Council’s Conservation and Heritage officer is content that the proposals are acceptable
subject to the use of appropriate conditions to provide more detail on the detailed design and
appearance of the proposed works associated with the new inlet structure in the vicinity of the
dam and set within a rock cutting. A condition requiring the submission of further details on
the appearance and materials to be used is proposed. 
Associated need for Listed Building Consent for works to Category A Listed Plant room
connections 
Members are requested to note that in addition to the applicant requiring S36 consent for the
creation of the new Turbine Hall, plant and associated tunnels and, a separate detailed Listed
Building Consent (which will be determined by the Planning Authority) is required to undertake
any works which could potentially adversely impact on the Category A listed Plant Room. 
Extensive discussions have been undertaken between Council Officers, HES and the
applicants to form agreement on the extent of the existing plant and machinery which forms
part of the listing potentially impacted by the proposals, and how the proposals can be
undertaken in a manner which respects the sensitivities of the existing listed plant room and
associated structures. 
These discussions have been running in tandem with the S36 process and Officers and HES
are content that the Listed Building Consent process can adequately safeguard the integrity
and character of the category A Listed Turbine Hall through this separate consenting regime. 
In respect of the S36 proposal and the need to safeguard the setting of the Category B Listed
Dam itself and the Category A Listed Falls of Cruachan Railway Duct, the Councils Heritage
advisor is content that  the use of conditions requiring the submission of further details to be
can properly address these matters. 
Having due regard to the above it is concluded that subject to the imposition of
appropriate conditions this proposal is consistent with the provisions of SG LDP ENV
16(a) – Development Impact on Listed Buildings; LDP 3 – Supporting the Protection,
Conservation and Enhancement of our Environment; Policy LDP 6 – Supporting the
Sustainable Growth of Renewables; and SG 2 Renewable Energy of the Argyll & Bute
Local Development Plan, NPF 3, Revised Draft NPF4 Policy 7 and Historic Environment
Policy for Scotland (April 2019) in this respect. 
K. IMPACTS ON ROAD TRAFFIC AND ADJACENT TRUNK ROADS (INCLUDING
CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against any
impact they may have on road traffic and adjacent trunk roads.   
Transport Scotland have the main responsibility for the adequate maintenance and proper
functioning of the Trunk Road network in Argyll and Bute. The A85 is critical for not only
residents and businesses going about their daily lives but also for tourism and associated
socio economic well-being of the whole community served by the A85 as a main arterial route.
As this is clearly an important matter, Officers have provided the Transport Scotland Response
in some considerable detail within the report for ease of reference. 
Page 208

Page 209

Members are requested to note that the Area Roads Manager has reviewed the response
from TS and the proposed conditions, and has raised no objection to the proposals or the
proposed conditions. 
Transport Scotland (TS) – have considered both the original EIAR and the FEI and advise that
they have no objection to the proposal subject to conditions to the conditions, set out below
and imposed on any grant of consent. Given the potential importance of roads as a planning
consideration comprehensive extracts of their consultation response have been set out below
for Members ease of reference: 
Temporary Traffic Management on A85(T) 
The EIAR states that construction of the main access tunnel portal will require temporary traffic
management on the A85(T). It was initially proposed to redirect the A85(T) using a temporary
build out on the loch foreshore, however, further information has been submitted to justify
discounting this approach due to the additional material and construction timescale required
to form this option. We note that it is now proposed to utilise the existing informal layby on the
A85(T) which is currently used as parking for the Falls of Cruachan railway station as well as
for hill walkers, to form a temporary realignment to the north of the existing A85(T), generally
as illustrated on Stantec Drawing 331201086/001/C/0862. We also note that at a width of
4.7m, the use of this layby will result in the need for one-way signalised shuttle workings,
lasting for approximately 3-4 months. Transport Scotland has indicated a desire for two-way
operation to be retained at this location during the construction period and discussions
continue on what might be possible at this location and the applicant is currently considering
alternative options. The applicant has also indicated that whilst traffic management is in place
on the A85(T), replacement public parking and access will be provided within the existing
Visitor Centre car park. The details of this and the provision of appropriate pedestrian linkages
along and across the A85(T) will require to be agreed. With regard to the current application,
Transport Scotland is content that this aspect is covered by a Planning Condition and that the
details of the temporary diversions and construction methodology affecting the A85(T) will be
dealt with post-consent(should planning consent be awarded). 
Development Access 
It is proposed to construct a new junction on the A85(T) at the eastern extents of the site to
provide access to the development area, in addition to the existing junction. This is illustrated
on Stantec Drawing 331201086/001/C/0859/P02. Transport Scotland has reviewed
preliminary design drawings for this junction and is content that the design of the junction can
be covered by a Planning Condition at this stage. 
Assessment of Environmental Impacts 
Chapter 9 of the EIAR presents the assessment of the likely significant transport effects arising
from the construction and operation of the proposed development. We also note that a
separate Transport Assessment (TA) has been prepared and is included at Appendix 9.1. The
EIAR states that the assessment has been undertaken in accordance with the Institute of
Environmental Management and Assessment (IEMA) Guidelines for the Assessment of Road
Traffic, Transport Assessment Guidance (2012), as well as the Design Manual for Roads and
Bridges (DMRB). Transport Scotland is satisfied with this approach. 
Study Area 
Chapter 9 states that in accordance with Transport Scotland’s scoping response, the A82(T)
and A85(T) have both been included within the study area. Baseline traffic flows have been
Page 209

Page 210

determined using automatic traffic count (ATC) data for 2019 from Transport Scotland’s
National Traffic Data System (NTDS) platform and ATC surveys undertaken in 2017. The 2017
data has been uplifted to 2019 data based on a factor derived by comparing the 2017
Transport Scotland NTDS traffic counts to 2019 Transport Scotland NTDS traffic counts. We
also note that in order to establish the AM and PM hour flows, the busiest hour between 06:00
-12:00 was taken as the AM peak hour and the busiest hour between 12:00 -18:00 was taken
as the PM peak hour for each traffic count location separately. As such, the AM and PM peak
hours used in the assessment are not uniform across all the traffic count locations and instead
relate to the highest hourly AM and PM traffic flows for each location separately. Transport
Scotland considers this approach to be acceptable…. 
… While we would acknowledge that the high percentage increase associated with HGV traffic
is a factor of relatively low base flows, Transport Scotland would consider that some form of
mitigation is appropriate. We note that the conclusion of the assessment is that the
construction phase of would result in a “Negligible” magnitude of impact and hence a
“Negligible” significance of effect, with no further mitigation proposed other than the embedded
mitigation as detailed within Section 9.7 of the EIAR. Transport Scotland does not see how
this conclusion can be reached without considering the specific HGV effects. Section 9.7
indicates the proposed embedded mitigation as being a review of the works programme to
seek to reduce effects on sensitive receptors where reasonably practicable and the
preparation and implementation of a Construction Traffic Management Plan (CTMP). It is
noted that Transport Scotland would have looked for a CTMP to mitigate any environmental
effects associated with increased HGV levels, so we are satisfied that appropriate mitigation
can be put in place. A CTMP will therefore be required which should be submitted to, and
agreed by, the Area Manager prior to the commencement of any works. A key aspect of the
construction management will be the inclusion of a programme of before / during / after road
condition surveys and the scope of these will require to be agreed with Transport Scotland.
The applicant will be required to enter a Legal Agreement under Section 96 of the Roads
Scotland Act 1984 (Extraordinary Damage to Road), whereby the applicant agrees to pay the
costs of such damage attributed to their works. The adoption of this strategy is intended to
ensure impacts on the structural integrity of the trunk road network are managed. 
Road Safety Audit 
We note that an independent Stage 1 Road Safety Audit (RSA) was undertaken for the
Widening of St Conan’s Road, the main access road to the Lower Control Works site and the
secondary access road to the Lower Control Works site. We note, however, that the
installation of the signals and the shuttle working has not been subject to any RSA at this
stage. Transport Scotland will require a Road Safety Audit to be undertaken for these works
and submitted to the Area Manager. This will require to be undertaken as part of the detailed
design process for the traffic management arrangements 
Abnormal Loads Assessment 
An Abnormal Indivisible Loads Assessment (AILA) has been provided within the TA. This
states that it is a preliminary assessment and that detailed AIL access route assessments will
be undertaken for each required AIL at the time of the programmed movement dates, once
the specification / dimensions of those loads are known. We note that the Port of Entry for
components has yet to be finalised, and as such, the AIL route has yet to be finalised. Potential
ports and associated routes have been identified, however, as the A85(T) and A82(T) connect
directly to the site from the east and the west, constraints on these two sections have been
identified within the AILA based upon a preliminary desktop study. This assessment has
identified numerous height, width and weight restrictions on the A85(T) and A82(T) between
Oban and Crianlarich, all of which could require further investigation and potential mitigation.
We note that the AILA states that a transformer of a similar dimension and weight to the one
Page 210

Page 211

assumed in the assessment was successfully transported to Cruachan Power Station from
Longannet Power Station in Fife. This AIL was transported during the night via the M876, M9,
A84(T), A85(T), A82(T) and A85(T). This required police escort, road closures on the A82(T)
between Crianlarich and Tyndrum and the temporary reinforcement of a bridge at Inverherive.
We understand that similar measures may be required during the delivery of AILs for the
current application and these would be assessed as part of future detailed AIL assessments.
Having discussed this issue with the applicant, Transport Scotland is content that the issue of
transporting AILs can be covered by appropriate Planning Conditions. 
Conclusions 
Based on the review undertaken and further to the various discussions with the applicant, we
can confirm that Transport Scotland is satisfied with the submitted EIAR and does not propose
to object to this planning application, on the understanding that the Conditions identified below
are attached to any consent granted. 
Condition 1: Prior to the commencement of any works, written approval from the planning
authority in consultation with Transport Scotland, must be obtained for the details of the
proposed means of access from the A85(T), generally in accordance with Stantec Drawing
Number 331201086/001/C/0859. Thereafter, the proposed access shall be constructed in
accordance with the approved details. 
Reason: To minimise interference with the safety and free flow of the traffic on the trunk road. 
Condition 2: Prior to the commencement of any works, a plan for the design, implementation
and duration of all temporary traffic management arrangements on the A85(T) must be
submitted to and agreed by the planning authority in consultation with Transport Scotland.
Thereafter, all temporary traffic management arrangements will be implemented in
accordance with the agreed plans. 
Reason: To minimise interference with the safety and free flow of the traffic on the trunk road. 
Condition 3: Prior to the commencement of any works, a detailed design and specification for
the proposed access portal structure beneath the A85(T) shall be submitted to and approved
in writing by the planning authority in consultation with Transport Scotland. Thereafter, the
proposed structure shall be constructed in accordance with the agreed plans. For the
avoidance of doubt preconstruction compliance will include, but not be restricted to: 
(i) Approval in Principle 
(ii) (ii) Category 3 structural design check to CG300 
(iii) (iii) Geotechnical Check - Category B to SH4 
Reason: To ensure that the proposed design of the works complies with the current standards
and that the safety and free flow of traffic on the trunk road is not diminished. 
Condition 4: Prior to the commencement of any works, a detailed design and specification for
any proposed sheet piling works adjacent to the A85(T) shall be submitted to and approved in
writing by the planning authority in consultation with Transport Scotland. Thereafter, the
proposed structure shall be constructed in accordance with the agreed plans. For the
avoidance of doubt pre - construction compliance will include, but not be restricted to: (i)
Approval in Principle (ii) Category 3 structural design check to CG300 (iii) Geotechnical Check
- Category B to SH4 
Reason: To ensure that the proposed design of the works complies with the current standards,
and that the safety and free flow of traffic on the trunk road is not diminished.
Page 211

Page 212

Condition 5: Prior to the commencement of any works, a Construction Traffic Management
Plan must be submitted to and approved by Transport Scotland. The complete report shall
include, but not be restricted to, details of the following: 
o Identification of designated construction vehicle routes to site
o Access arrangements o Methods to ensure that construction routes are followed 
o Identification of construction vehicle volumes set against key construction tasks and
programme 
o Measures to minimise and control construction vehicle volumes
o Measures such as wheel washing and dust suppression requirements 
o Construction staff travel arrangements 
o Confirmation of site working hours 
o Measures for mitigating HGV movements through settlements lying within the A85 and A82
trunk road corridors 
o Measures for accommodating displaced car parking from the A85(T) during construction. 
o Measures for maintaining pedestrian access along and across the A85(T) during
construction. 
o Arrangements for monitoring accelerated wear and tear on the road network
o A blasting plan is to be included as part of CTMP 
o Arrangements for abnormal loads o Signage details and details of any temporary traffic
management arrangements o Site liaison details 
o Arrangements for monitoring and updating the CTMP 
Reason: To minimise interference and maintain the safety and free flow of traffic on the Trunk
Road as a result of the traffic moving to and from the development 
Condition 6: Prior to commencement of works on site, a methodology and programme shall
be submitted to and agreed with the planning authority in consultation with Transport Scotland,
relating to the monitoring of the condition of the A85 trunk road. Thereafter the approved
programme of monitoring shall be implemented. Any remedial works shown by the monitoring
as arising from the construction of the development, shall be undertaken by the applicant
within 3 months of the completion of the final monitoring undertaken, unless an alternative
means of securing the works is approved in writing by the Planning Authority in consultation
with Transport Scotland. 
Reason: To ensure the fabric of the trunk road is not adversely affected by the construction
operations 
Condition 7: Prior to commencement of deliveries to site, the proposed route for any abnormal
loads on the trunk road network must be approved by the trunk roads authority prior to the
movement of any abnormal load. Any accommodation measures required, including the
removal of street furniture, junction widening and any traffic management, must similarly be
approved. 
Reason: To minimise interference and maintain the safety and free flow of traffic on the Trunk
Road as a result of the traffic moving to and from the development. 
Condition 8: During the delivery period of construction materials / plant etc., any additional
signing or temporary traffic control measures deemed necessary due to the size or length of
any loads being delivered or removed must be undertaken by a recognised QA traffic
management consultant, to be approved by Transport Scotland before delivery commences. 
Reason: To ensure that the transportation will not have any detrimental effect on the road and
structures along the route. 
Page 212

Page 213

Transport Scotland has not included any Conditions relating to works associated with, or in
close proximity to, the railway line or the various approvals and consents which will need to
be obtained from Network Rail regarding these. Transport Scotland is willing to liaise and
consult with Network Rail as required but would fully expect and anticipate Drax to do the
same. 
In addition to the above Conditions the applicant should also be informed of the following
advisory notes setting out requirements relating to works within the trunk road boundary. 
i. The applicant should be informed that the granting of planning consent does not
carry with it the right to carry out works within the trunk round boundary and that
permission must be granted by Transport Scotland Roads Directorate. 
ii. Trunk road modification works shall, in all respects, comply with the Design Manual
for Roads and Bridges and the Specification for Highway Works published by
HMSO. The developer shall issue a certificate to that effect, signed by the design
organisation.
iii. Trunk road modifications shall, in all respects, be designed and constructed to
arrangements that comply with the Disability Discrimination Act: Good Practice
Guide for Roads published by Transport Scotland. The developer shall provide
written confirmation of this, signed by the design organisation.
iv. The road works which are required due to the above Conditions will require a Road
Safety Audit as specified by the Design Manual for Roads and Bridges.
v. Any trunk road works will necessitate a Minute of Agreement with the Trunk Roads
Authority prior to commencement.
vi. To obtain permission to work within the trunk road boundary the developer should
contact the Area Manager through the general contact number 0141 272 7100.
vii.  The Operating Company has responsibility for co-ordination and supervision of
works and after permission has been granted it is the developer's contractor's
responsibility to liaise with the Operating Company during the construction period
to ensure all necessary permissions are obtained. 
The Council’s Roads & Amenity Services 
The Area Roads Manager has reviewed the above response by TS and both the original EIAR
and the FEI.  He advises that the site access connects directly to the A85 and that the advice
of Transport Scotland should be sought by the ECU on the formation of this junction.  The
area Roads Manager has commented that: 
Trunk Roads to comment on A85 issues. 
It is noted that the Trunk Road network will probably be impacted more than the local area
network. If the local area roads network is to be affected by disposal of excavated materials
for any reason then commensurate improvements may be required to facilitate significant
additional vehicle movements at the developer’s expense. 
The following conditional matters have been requested to be imposed by the Area Roads
Manager. 
 Information to be provided on locations for disposal of material from works, specifically
the impact on local area roads and infrastructure. Construction Traffic Management
Plan to be provided if necessary. 
 Traffic Impact Analysis required to cover any potential impact on Argyll and Bute
Council local area roads. This report should include a cumulative report in concert with
other S36 and S37 schemes in the North Argyll/ Loch Awe area paying particular
attention to the possibility of utilizing materials locally to prevent unnecessary vehicle
Page 213

Page 214

movements thus reducing the potential for related deterioration of the fragile local area
roads network. 
Discussions have been undertaken with the applicant about seeking to minimise the
transportation of extracted rock material on the road network as part of minimising both HGV
traffic on the wider road network, but also reducing emissions associated with this. 
It has been agreed in discussions between the applicant and the Area Roads Manger that the
requested Cumulative TIA which both Transport Scotland and The Area Roads Manager will
require to approve should be conditioned, but also that as part of the CEMP a “waste”
management plan and strategy should be provided to clarify how the applicants have sought
to maximise local use of the extracted materials rather than transport it to more distant
locations using the roads network. At the moment Officers have been informed that the
use/destination of all materials has not been finalised and Officers consider that this is a matter
which would benefit from further discussions between the applicants. A&B Council and
Transport Scotland and the suggested condition will seek to achieve this approach. 
Having due regard to the above, subject to the relevant conditions being attached to
any consent granted by the ECU, it is concluded that the proposal  will not have any
adverse impacts on road traffic and adjacent trunk roads and the proposal is consistent
with the provisions of SG2 Renewable Energy, Policy LDP 6 – Supporting the
Sustainable Growth of Renewables; SG LDP TRAN 4 – New and Existing, Public Roads
and Private Access Regimes of the Argyll & Bute Local Development Plan , NPF 3 and
Revised Draft NPF4 Policy 12 
L. EFFECTS ON HYDROLOGY, THE WATER ENVIRONMENT AND FLOOD RISK
(INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, Supplementary Guidance
2: Renewable Energy and SPP require applications for renewable energy developments to be
assessed against effects on hydrology, the water environment and flood risk.   
In their initial consultation response SEPA raised a number of concerns/questions in respect
of drainage/flooding and other technical matters which they required further clarification on,
as set out below: 
We have reviewed the information supplied with the EIAR and have found it to be insufficient
to allow us to determine the potential impacts. We therefore submit a holding objection and
request determination be deferred until further information is provided in relation to
hydrogeological / groundwater issues, site ecology and flood risk as detailed in Sections 1, 4
and 5 below. We will review our position if these issues are adequately addressed. 
We support the intention produce a Site Waste Management Plan (SWMP) and that this is to
remain a live document throughout the duration of the construction period. We request a
planning condition requiring the preparation of a full SWMP once design and contracting
elements of the project are confirmed. We agree this should build on the information provided
in the EIAR and specifically, given the potential implications for its storage and the reuse
potential of the material, this will also need to be informed by the outcome of further
assessments required in relation to the potential for the geology at the site to generate acidic
leachates and acid rock drainage as discussed in Section 1 above and Appendix 2 enclosed. 
4.1 We have concerns regarding the impact to groundwater dependent flush habitats, in the
Lower Site Compound area and throughout Upper Works (particularly down the slopes leading
into Cruachan Reservoir and down to the existing Access Track). The mapping provided in
Figures 3.3 and 3.4 of EIAR Appendix 8.1 Non-Avian Ecology does not show the location of
Page 214

Page 215

the flushes and the text has not made it clear how close the flushes are to excavation areas,
nor their relative position. The M10 and M11 base-rich flushes can be assumed to be
groundwater dependent, however the groundwater dependency of other potential GWDTE
habitats noted on site has not been assessed. 
We therefore request further information be provided to: a) Assess the likelihood of
groundwater dependency of the potential GWDTE habitats which will be directly or indirectly
impacted by the development. M10 and M11 flushes are assumed to be groundwater
dependent so do not need to be included in the assessment; and b) Illustrate the relative
position of the infrastructure and excavation areas in relation to the flushes, other groundwater
dependent wetlands and wetlands valuable for nature conservation (i.e. all levels of
importance above site level). The groundwater dependent wetlands should only be included
for those assessed as being likely to be groundwater dependent. 4.2 Given the reliance on
the Habitat Restoration and Landscape Mitigation Plan to address impacts to wetland habitats
and peat we request an outline plan is provided prior to determination for review. A planning
condition should also be applied to require the full plan to be submitted before
commencement. Damage to groundwater dependent flushes is often permanent; it is difficult
or impossible to reinstate or restore flushes after direct impact or redirection of groundwater
emergence; the HRLMP, CEMP and infrastructure layout must consider this and address the
likely outcome for these habitats, which are important for nature conservation. 4.3 Further
information must be provided on the layout of the Lower Site Compound and the requirement
to excavate at this location. The applicant should clarify if alternative locations for the Lower
Site Compound were considered, if excavation can be avoided where peat depth is greater
than 0.5 metre and if there are flushes in the Lower Site Compound area and how will these
be managed 
Therefore, a flood wall to a 1 in 100 SoP will not ensure the development will necessarily
remain operational during a 200-year event. FRA Appendix E indicates the precise SoP is
107-year event and anything greater will overtop the proposed wall. We therefore request the
design of the flood wall is modified to ensure it is designed and constructed to remain
operational during the 1 in 200 year flood even
During the construction phase of the project it is anticipated 2.3 million tonnes of excavated
rock arisings will be produced over the 5.5 year construction period (2024- mid 2029). EIAR
Section 3.8.2 indicates that the excavation arisings will be in the form of rock ‘chippings’
ranging from boulders to fines produced by drill and blast techniques. It is reported that drill
and blast methodology is assumed to be used for all underground works….0.45 million tonnes
of excavated material is to be reused on site. It is proposed that 140,800 tonnes of material
will be used towards the construction of a 510m long quayside structure on Loch Awe and
used in concrete production. The excavation arisings, 15,000 tonnes of spoil at any one time,
will be stored on the quayside structure, prior to transportation off-site by road. The arisings
will be stored under a canopy structure, enclosed on three sides to prevent runoff and
windblown silt from entering Loch Aweon for lining the tunnels. There is currently no agreed
use for the remaining excavated material. 
We also request, if you are minded to grant consent, the planning conditions detailed in
Sections 2.6 (Site Waste Management Plan), 4.2 (Habitat Restoration and Landscape
Mitigation Plan) and 4.8 (Peat Management Plan) be attached to the consent. 
(Additional information provided on these matters in FEI on 14.12.22) 
Although many of these matters have now been addressed by the EIAR/ FEI submissions and
further clarifications provided to SEPA by the applicants, there remains one outstanding matter
on which SEPA have maintained a holding objection to the proposals as set out below: 
Page 215

Page 216

Potentially Acid Generating (PAG) Rock Construction of the Cruachan Expansion
Project will require the removal and management of an estimated 2.3 million tonnes of rock.
The EIAR states it is likely some of the arisings will be Potentially Acid Generating (PAG)
rock. We previously requested more information to understand the potential for the site
geology to generate acidic leachates and acid rock drainage and to evaluate the
appropriateness of material reuse as fill materials and concrete aggregates. The findings
from the initial investigation in the submission are that some of the material is likely or highly
likely to be potentially acid generating which means the rock arisings could potentially leach
acidic leachate and mobile metals. This will heavily influence material storage, transport,
disposal and potential reuse options. 
While we agree with the applicant that an Acid Rock Drainage (ARD) Management Plan
will be required (and secured as a planning condition), there remains significant uncertainty
regarding the amount of material which will be potentially acid generating. No information
has been provided to estimate the scale of the issue. We therefore cannot currently advise
on the potential environmental effects associated with this element of the project. 
It is likely this material will have to be segregated and disposed of at an appropriate site
(i.e. landfilled) with mitigation to prevent environmental impacts and regulation by SEPA
under the Pollution Prevention and Control (Scotland) Regime (PPC). At this stage it is not
clear what size of site would be needed and whether a suitable one would be available to
accept the material. This represents a significant environmental risk which we expect to be
addressed before determination. 
On that basis we maintain our holding objection on grounds of lack of information in
relation to the potential impacts associated with the potentially acid generating rock. To
allow us to revisit this position we require further information to outline how much material
is potentially acid generating, what will be the disposal method for it, the environmental
risks involved and the contingencies should more material than anticipated be affected. 
The treatment of this material will be tied into the required waste management plan which
officers consider is required to sit outside the general CEMP as there are very specific and
detailed matters which require to be addressed. In the opinion of Officers this will be best
achieved through a separate document and not folded these matters into the larger CEMP
submissions. SEPA have already advised the ECU that a condition on these matters is
required. 
Officers verbally discussed this Objection with SEPA on 22.1.23 and they have clarified that
this is not an objection in principle to the development but a technical matter they require to
be satisfactorily addressed before withdrawing their objection. This will be a matter for the
ECU to resolve prior to reaching their conclusion on the proposal and is not considered a
matter which the Planning Authority should raise objection to. 
Having due regard to the above, subject to the relevant conditions being attached to
any consent granted by the ECU, it is concluded that the water environment and flood
risk have been considered and the proposal is consistent with the provisions of SG 2
Renewable Energy, Policy LDP 6 – Supporting the Sustainable Growth of Renewables
and SG LDP SERV 7 – Flooding and Land Erosion – The Risk Framework for
Development of the Argyll & Bute Local Development Plan, SPP (2014), NPF 3 and
Revised Draft NPF4 Policy 1 
M. IMPACTS ON TOURISM AND RECREATION (INCLUDING CUMULATIVE IMPACTS) 
Page 216

Page 217

Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against any
impact they may have on tourism and recreation. 
There is no record on the ECU website of any consultation advice from Visit Scotland on the
ECU website.  It is considered that it would be beneficial for the ECU to obtain their views prior
to reaching a decision on this proposal. 
The Council regards landscape as being a particularly valued asset both in terms of its intrinsic
qualities and in terms of its value to the tourism economy. For all types of development the
maintenance of landscape character is an important facet of decision-making in the
countryside in Argyll & Bute, regardless of the scale of development proposed. The Council’s
LDP Policy LDP 6 identifies impacts on tourism and recreation as a material consideration in
the assessment of renewable energy developments on the basis that inappropriate
developments with significant adverse effects which contribute to the degradation of
landscape character are unlikely to be in the interests of the Argyll tourism economy. 
Potential impacts on tourism are addressed within the EIAR at Volume 1 chapter 13.The EIAR
at 13.7.13 recognises that: 
Argyll and Bute is a popular tourist destination owing to its high quality natural environment,
heritage attractions and onward travel connections to the Western Isles and Inner Hebrides.
Tourism is a key sector and a growing industry in Argyll and Bute. In 2019, Argyll and the Isles
witnessed notable growth in overnight tourism. Both domestic and international visitors
increased in numbers which resulted in even bigger rises in nights and expenditure. Between
2017 and 2019, overnight trips to Argyll and the Isles were just under a million per year on
average, a 15% increase from 2016-2018-22. ..Argyll and Bute has the highest share of
tourism businesses when compared to any other area in Scotland. Tourism businesses make
up 13% of businesses in Argyll and Bute compared to a national average of 8%23. 
The EIAR also clarifies that; 
Within the Study Area, Drax’s Hollow Mountain visitor centre at the Cruachan pumped storage
hydro power station is a popular indoor tourist destination. The visitor centre attracts
approximately 50,000 visitors a year and in 2019 was ranked among the top 2% of Visit
Scotland’s quality assurance scheme with high scores for friendliness and hospitality. St
Conan’s Kirk in the village of Loch Awe is another indoor tourist destination in the Tourism and
Recreation Study Area. It is a Category A listed building and a landmark which attracts visitors
to the village of Loch Awe. It is accessed from the A85 and benefits from impressive views
towards Loch Awe. 
In respect of potential visual impacts it is not considered that the proposals will have a long
term significant adverse impact as the majority of the permanent works will be underground
or be subject to appropriate landscape mitigation measures. The new quayside and office
buildings will be retained, however as they are in the general local of the existing visitors centre 
and subject to appropriate scale/design and landscaping it is not considered that these will
have an unacceptable permanent impact on the landscape or on tourism. 
The Cruachan dam and ridge are important tourist attractions in themselves and Drax have
confirmed in their submissions in Volume 1 chapter 13 (Table 13.1) of the EIAR that access
to the Cruachan Dam and also the Cruachan Ridge will not be restricted. This is welcomed.
It should however be noted that; 
…it is considered that the indoor tourist destination of Cruachan Visitor Centre and tour of
the ‘Hollow Mountain’, could experience effects during the construction phase and therefore
Page 217

Page 218

the potential impacts on indoor tourist destinations during construction have been
assessed” 
The Council’s Access Manager has requested that an access plan be produced for the
proposals to ensure clarity on access matters and a condition to this effect is therefore
recommended. The require CEMP will also require to demonstrate how parking will be
provided to access these features. The confirmation by the applicant that a more localised
Construction Traffic Management Plan will be provided either separately as part of the overall
CEMP, which will require to be approved by TS and the Area Roads Engineer, is welcomed. 
The evaluation of potential construction phase impacts upon indoor and outdoor tourism are
provided at Table 13.10 of the EIAR and conclude that all of the potential impacts are minor
and not of significance, with the exception of impacts upon visitor accommodation where it is
accepted that: 
In the absence of firm proposals for the accommodation of the construction workforce,
significant adverse effects could arise on the visitor accommodation sector. This would
result from accommodation being block booked for extended periods of time (high
magnitude of change) and therefore being unavailable to the tourism sector during the
construction period. This would be a major (significant) adverse effect. 
The impact on visitor accommodation is set in the context of it being a constituent part of
the tourism sector. If visitor accommodation is block booked, for up to 6 years in this
instance, it becomes unavailable to the tourism sector and the magnitude of change in
visitor attractiveness and tourism potential is therefore high as the benefits don’t accrue
to the other local businesses that serve the tourists staying in the hotels and guest houses.
These accommodation providers would no longer be serving the tourism sector, instead
they will play a role in serving the construction sector. 
Conversely, the use of visitor accommodation on an ad-hoc basis for visiting executives,
engineers and specialist advisors, would have a moderate beneficial effect, but this would
only accrue if the accommodation options are not exhausted by use for construction
workers. In the absence of firm proposals for construction worker accommodation this
effect will not be realised and therefore the potential effect remains major and adverse 
The EIAR confirms that there is a projected significant impact on visitor accommodation.
Officers also consider there will be potential impacts upon the operation of the general rented
housing market as well as workers seek to find accommodation displacing local families and
individuals and have requested that these matters be considered further by the Scottish
Ministers prior to any determination of the S36 application being made and a deemed planning
permission issued to ensure NPF 4 policies and objectives are fully considered. 
Having due regard to the above, in terms of the impacts on tourism and recreation the
proposal is considered to be consistent with the provisions of: SG LDP TRAN 1 –
Access to the Outdoors; LDP STRAT 1 – Sustainable Development; LDP DM1 –
Development within the Development Management Zone; LDP 3 – Supporting the
Protection, Conservation and Enhancement of our Environment;  Policy LDP 6 –
Supporting the Sustainable Growth of Renewables; SG LDP ENV 14 –Landscape; and
SG 2 Renewable Energy of the Argyll & Bute Local Development Plan, NPF 3 and
Revised Draft NPF4 Policy 25 
N. NET ECONOMIC IMPACT, INCLUDING LOCAL AND COMMUNITY SOCIO-ECONOMIC
BENEFITS SUCH AS EMPLOYMENT, ASSOCIATED BUSINESS AND SUPPLY CHAIN
OPPORTUNITIES 
Page 218

Page 219

Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewables and
SPP require applications for renewable energy developments to be assessed against net
economic impact, including local and community socio-economic benefits such as
employment, associated business and supply chain opportunities. 
.  
Community Benefit is not considered to be a ‘material planning consideration’ in the
determination of planning applications for Energy Related Developments.  In the event that 
the Scottish Ministers permission were to be granted, the negotiation of any community
benefit, either directly with the local community or under the auspices of the Council, would
take place outside the application process between the Scottish Ministers, The Council and
the applicant. This is the established procedure for such discussions. 
The EIAR confirms that Based the capital cost estimate provided by the application in June
2021 the construction of the proposed development is expected to require a UK capital
expenditure of £450 million. This will give rise to employment and associated expenditure in
the economy (direct, indirect, and induced). Construction of the proposed development is
expected to extend across a 6-year programme of works to achieve operation of the first unit 
The construction of the Proposed Development is therefore estimated within the EIAR to
support a total 3567 gross Person Years of Employment (PYE) 31 over the 6-year construction
period across the study area. This equates to 357 Full Time Equivalent (FTE)’s over the 6-
year construction programme across the study area. 
The EIAR further states that 
Based on the additionality assumptions, the 3,567 gross temporary construction jobs
created by the Proposed Development are expected to support approximately 664 net
temporary construction jobs across the 6-year construction period within the Labour Market
Study Area. This represents 34.9% of existing construction jobs (664 jobs) within the study
area. 
The key sector likely to experience socio-economic effects from the Proposed Development
during the construction phase is the construction sector. The effects on the construction
sector have been reviewed and analysed in Section 13.11.3 to 13.11.9 above resulting in
a conclusion of Short-Term Major Beneficial effect. 
The operation of the Proposed Development would result in a Negligible Beneficial
magnitude of change on the Key Business Sector of Construction (High sensitivity receptor)
resulting in a Minor Permanent Beneficial effect. 
The EIAR confirms that there will be significant short term employments benefits, particularly
in the construction industry, however the long term benefits in respect of employment are
minor. This of course has to be viewed in the context that the benefits from workers moving
into the area , displaces the tourists who would otherwise take up some of this accommodation
which is not a benefit which is also recognised in the EIAR. The EIAR confirms; 
Drax have confirmed to Officers that they will be seeking to use local staff and materials where
they can and also that they are already engaging with other organisations to provide wider
benefits to Argyll and Bute. 
 Drax will organise Meet the Supplier days to match local companies with
opportunities during the construction phase. 
 Drax is the first UK energy company to announce an initiative to improve
employability for a million people by 2025. Through its ‘Mobilising a Million’ initiative,
Page 219

Page 220

Drax will connect with one million people by 2025 to improve skills, education,
employability, and opportunity. The Proposed Development will provide opportunity
for Drax to provide more opportunities in Argyll and Bute. 
 Drax has a long running apprenticeship scheme which is part of its commitment to
developing new talent as well as upskilling the workforce across the communities
where it operates, including Argyll and Bute. The craft apprenticeship scheme,
which operates at Cruachan, gives new recruits to Drax the opportunity to gain skills
and expertise by working alongside highly qualified engineers. An expanded
Cruachan power station will allow Drax to continue and expand this scheme giving
apprentices a chance to development core skills and prepare for future careers.
These unique opportunities provided by Drax can boost economic development
across Argyll and Bute. 
The applicants submit that during the construction phase there will be opportunity for the
provision of work experience and apprenticeships and the applicant has already engaged with
local schools and colleges and Highland and Islands Enterprise with regard to training and
apprenticeship programmes to maximise local employment opportunities. This is welcomed
and in their additional NPF 4 related submissions on 20.1.23 they further clarify that: 
 NPF4 calls for national developments to be exemplars of a Community Wealth
Building (CWB) approach to economic development. CWB is defined as “A people-
centred approach to local economic development, which redirects wealth back into
the local economy, and places control and benefits into the hands of local people”. 
 Along with the direct employment opportunities Drax provides at Cruachan, they
also offer opportunities for STEM learning through educational tours of Cruachan
and Drax personnel visit local schools to talk to students about routes into STEM
careers and deliver hands on STEM learning workshops. Drax also offer work
experience opportunities for Oban High School students to gain experience in
engineering in the workplace environment. During Scottish Apprenticeship week
Drax offer workshops to schools and colleges focussing on application skills and
opportunities available for Drax apprenticeships across their operational assets.
The proposed expansion of Cruachan Power Station will allow Drax to continue and
expand these initiatives giving local young people a chance to develop core skills
and prepare for future careers. 
They further state that; 
The Cruachan Expansion project can boost economic development across Argyll and
Bute and will contribute to meeting key priorities not only of NPF4 but also the Argyll and
Bute Economic Strategy 2019-2023 by attracting inward investment, bringing additional
jobs and learning opportunities and improving linkages between skills providers and
employers in both the public and private sector 
These measures are welcomed and the Planning Authority considers that delivering on these
wider socio economic benefits are an important aspect of the successful delivery of the project.
However, as previously clarified, such matters have historically been addressed outside the
S36 Application process by the Council and Officers can identify no reason that this should
not continue to be the case for this application. 
Given the large scale of this project along with the extended duration of the
construction works, it is considered that there is the potential for the development to
Page 220

Page 221

have adverse impacts on the local community caused be a greater demand and
competition for housing.  The Oban and Lorn housing market area is one of the more
pressured in Argyll and Bute with higher levels of demand for housing combined with
a higher proportion of the existing housing stock being in use a short term lets for
tourism.  Mitigation is therefore required to address this impact which otherwise would
result in the proposal being unacceptable.  It is therefore recommended that, should
the application be approved, a suspensive condition should be attached to the deemed
planning consent, requiring the submission of a strategy for housing incoming
construction workers.  It is considered that this condition would give the applicant
flexibility and allow for the consideration of a number of possible options including, but
not limited to the provision of additional permanent housing in the area, the use of
buildings which are currently vacant, the provision of temporary accommodation for
workers or bussing in workers from further afield. 
Having due regard to the above the proposals net economic impact, including local and
community socio-economic benefits such as employment, associated business and
supply chain opportunities has been assessed and it is concluded that the proposal is
consistent with the provisions of Supplementary Guidance 2 (December 2016); LDP
DM1 – Development within the Development Management Zones; LDP 3 – Supporting
the Protection, Conservation and Enhancement of our Environment; LDP 6 - Supporting
the Sustainable Growth of Renewables; NPF 3 and Revised Draft NPF4 Policies 11(c)
and 25 
O. THE SCALE OF CONTRIBUTION TO RENEWABLE ENERGY GENERATION TARGETS 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against the
scale of contribution to renewable energy generation targets.   
The Scottish Government is committed to increasing the supply of renewable energy within
Scotland.  The Climate Change (Emissions Reduction Targets) (Scotland) Act 2019 sets
stringent targets for Scotland. The Act sets a legally-binding “net-zero” target of all greenhouse
gases by 2045. The “net-zero” target for Scotland is five years ahead of the date set for the
whole of the UK.   
The proposal would provide approximately 600MW of additional power Generation and
represents a significant and nationally important uplift in pump storage renewable energy
production. As referenced elsewhere in this report. The expansion of Cruachan is a specific
national priority contained within NPF3 and also revised draft NPF 4 which comes into force
as a statutory planning document on 13.2.23. 
Having due regard to the above the proposals scale of contribution to renewable energy
generation targets has been assessed and it is concluded that the proposal is
consistent with the provisions of SG 2; Supplementary LDP STRAT 1 – Sustainable
Development; LDP DM1 – Development within the Development Management Zone;
LDP 3 – Supporting the Protection, Conservation and Enhancement of our
Environment; LDP 6 - Supporting the Sustainable Growth of Renewables; SPP (2014);
NPF 3 and Revised Draft NPF4 Policies 1 and 11 
P. EFFECT ON GREENHOUSE GAS EMISSIONS 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against their
effect on greenhouse gas emissions.  
Page 221

Page 222

The proposal would generate renewable electricity and would therefore displace carbon
dioxide (CO2) emissions associated with electricity generation, which would otherwise be
supplied via other forms of power generation requiring the combustion of fossil fuels. 
Having due regard to the above the proposals effect on greenhouse gas emissions has
been assessed and it is concluded that the proposal is consistent with the provisions
of SG 2 Renewable Energy; LDP STRAT 1 – Sustainable Development; LDP DM1 –
Development within the Development Management Zone; LDP 3 – Supporting the
Protection, Conservation and Enhancement of our Environment; LDP 6 - Supporting
the Sustainable Growth of Renewables; SPP (2014); NPF3 and Revised Draft NPF 4
Policies 1 and 11. 
Q. THE NEED FOR CONDITIONS RELATING TO THE DECOMMISSIONING OF
DEVELOPMENTS, INCLUDING ANCILLARY INFRASTRUCTURE, AND SITE
RESTORATION (INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, Supplementary Guidance
2: Renewable Energy and SPP require applications for renewable energy developments to be
assessed against the need for conditions relating to the decommissioning of developments,
including ancillary infrastructure, and site restoration.   
The Proposed Development will have a design life of circa 100 years, after which the need for
re-powering or decommissioning will be considered at that time. The Proposed Development
is therefore treated as permanent in the submitted EIAR, and repowering and
decommissioning are therefore not considered. 
On a project with this projected lifespan, where the substantive new build elements are
underground, and judged by officers not to be causing substantive harm in terms of landscape
or localised impacts, this is considered by officers to be a reasonable approach. 
Having due regard to the above it is concluded that the need for conditions relating to
the decommissioning of developments, including ancillary infrastructure, and site
restoration has been considered and the proposal is therefore consistent/inconsistent
with the provisions of SG 2 Renewable Energy, Policy LDP 6 – Supporting the
Sustainable Growth of Renewables of the Argyll & Bute Local Development Plan, SPP
(2014); NPF3 and Revised Draft NPF 4 Policy 12.   
R. OPPORTUNITIES FOR ENERGY STORAGE (INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, Supplementary Guidance
2: Renewable Energy and SPP require applications for renewable energy developments to be
assessed against any opportunities for energy storage which exist.   
The proposal is for pump hydro storage to store energy from the development or excess
electricity from the national grid by pumping up water and releasing it at time of high demand,
providing stability to the electricity supply network, meeting energy demands and providing
improved energy security.   
Having due regard to the above it is recommended that the Council should not object
to the proposal on the grounds of opportunities for energy storage (including
cumulative impacts) in accordance with the provisions of SG 2 Renewable Energy,
Page 222

Page 223

Policy LDP 6 – Supporting the Sustainable Growth of Renewables of the Argyll & Bute
Local Development Plan, SPP (2014); NPF3 and Revised Draft NPF4 Policies 1 and 11. 
S. THE NEED FOR A ROBUST PLANNING OBLIGATION TO ENSURE THAT OPERATORS
ACHIEVE SITE RESTORATION (INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, Supplementary Guidance
2: Renewable Energy and SPP require applications for renewable energy developments to be
assessed against the need for a robust planning obligation to ensure that operators achieve
site restoration. 
The Proposed Development will have a design life of circa 100 years, after which the need for
re-powering or decommissioning will be considered at that time. The Proposed Development
is therefore treated as permanent in the submitted EIAR, and repowering and
decommissioning are therefore not proposed. On a project with this projected lifespan, where
the substantive new build elements are underground and judged not to be causing substantive
harm, this is considered by officers to be a reasonable approach. 
Having due regard to the above it is concluded that opportunities for a robust planning
obligation to ensure that operators achieve site restoration have been considered and
the proposal is therefore consistent with the provisions of SG 2 Renewable Energy,
Policy LDP 6 – Supporting the Sustainable Growth of Renewables of the Argyll & Bute
Local Development Plan, SPP (2014); NPF3 and Revised Draft NPF 4 Policy 12. 
T. CLIMATE CHANGE (EMISSIONS REDUCTION TARGETS) (SCOTLAND) ACT 2019, and
THE SCOTTISH ENERGY STRATEGY 
The Climate Change (Emissions Reduction Targets) (Scotland) Act 2019 - The Scottish
Government is committed to increasing the supply of renewable energy within Scotland.  The
Climate Change (Emissions Reduction Targets) (Scotland) Act 2019 sets out stringent targets
for Scotland. The primary objective of the Act is to raise the ambition of the greenhouse gas
emissions reduction targets set out in the Climate Change (Scotland) Act 2009. The Act sets
a legally-binding “net-zero” target of all greenhouse gases by 2045. The “net-zero” target for
Scotland is five years ahead of the date set for the whole of the UK.   
The Scottish Energy Strategy (SES)  (2017)  and SES Position Statement (2021) – The SES
was published in December 2017 and sets out the Scottish Government’s strategy through to
2050, marking a ‘major transition’ over the next 3 decades in terms of energy management,
demand reduction and generation. The SES sets 2 new targets for the Scottish energy system
by 2030: The equivalent of 50% of the energy for Scotland’s heat, transport and electricity
consumption to be supplied from renewable sources; and, an increase by 30% in the
productivity of energy use across the Scottish economy. The SES recognises that reaching
the 50% target by 2030 ‘will be challenging’ but the target demonstrates ‘the SG’s commitment
to a low carbon energy system and to the continued growth of the renewable energy sector in
Scotland’. 
SPP, NPF3 and NPF4 
Despite now being seven years old, NPF3 and SPP are extant statements of Scottish
Government planning policy and will remain in place until such time as NPF4 is adopted on
13.2.23. The status of NPF3 and SPP has not changed and they are significant material
considerations in the determination of the present application. 
Page 223

Page 224

The SPP introduced a presumption in favour of development that contributes to sustainable
development. Paragraph 28 states: “The planning system should support economically,
environmentally and socially sustainable places by enabling development that balances the
costs and benefits of a proposal over the longer term. The aim is to achieve the right
development in the right place; it is not to allow development at any cost” 
Renewable energy generation targets are supported by NPF3 but that support is qualified as
mirrored in SPP. It is stated at paragraph 4.7: “The pressing challenge of climate change
means that our action on the environment must continue to evolve, strengthening our longer-
term resilience. A planned approach to development helps to strike the right balance between
safeguarding assets which are irreplaceable, and facilitating change in a sustainable way.”
Paragraph 4.4 of NPF 3 recognises that Scotland’s landscapes are spectacular, contributing
to our quality of life, national identity and visitor economy. Landscape quality is found across
Scotland and all landscapes support place-making. 
Revised Draft NPF 4 continues to provide a supportive policy framework for development of
this type, and as has been referenced previously, specifically supports the expansion of hydro
power generation at Cruachan as a National Priority. 
Having due regard to the above subject to the recommended advice and conditions it
is considered that the proposal is consistent with the provisions of: SPP, NPF3, the
Scottish Energy Strategy 2017; NPF3 and Revised Draft NPF4 Policies 1 and 11 , in this
regard, which represent the Scottish Governments most up to date position on this type
of development. 
U. CONCLUSION & RECOMMENDATION 
Both SPP and the Argyll & Bute Local Development Plan support renewable energy
developments provided it has been adequately demonstrated that there would be no
unacceptable significant adverse effects.  Support is also offered by revised Draft NPF4, its
overall climate change objectives, and policy 11 in particular which supports developments
such as this, as well as identifying Cruachan Expansion as a specific Nationally Important
project in its own right. 
There is clear support throughout national and international policy that renewable energy
projects, such as the proposed development, are supported and do have the capability of
making an active contribution to the net zero targets Scotland is required to reach. The
proposal will make a direct contribution to meeting the range of both international and national
energy targets, whilst producing clean energy that meets the legally binding low carbon and
net zero targets. The proposal will directly contribute to tackling climate change by reducing
our reliance on fossil fuels for producing energy. 
The specific inclusion of the Cruachan expansion proposal in Revised Draft NPF4 (Carried
over from NPF3) as a nationally important and individually identified project which promotes
sustainable development and assist in addressing the climate emergency is a substantive
policy consideration in support of the proposal. 
It is accepted that the proposal would make an important contribution to the Scottish
Government’s renewable energy targets and reduce greenhouse gas emissions and these
matters are important benefits which have been carefully considered and carry substantive
weight in determining whether the proposals should be supported. 
Page 224

Page 225

Officers therefore conclude, that subject to the recommended advice and conditions from
external and internal consultees, that the proposal is consistent with the relevant provisions of
SPP and the Argyll and Bute Local Development Plan in all other respects. 
V.    RECOMMENDATION: 
Officers recommend that Members agree that the Council does not object, subject to
the conditions as detailed below 
Matters which the Council recommend that the ECU consider prior to determination 
 That the conditions recommended by other consultation bodies are included in the suite
of final conditions, the Council would expect to be consulted on any final list of conditions
prior to permission being granted, should Scottish Ministers be minded to do so. 
 The Council would also expect to be consulted on any further mitigation, changes to the
layout should the proposal be required to be amended in line with any further advice
provided by other consultation bodies. 
Conditions to be considered by ECU for inclusion in overall suite of conditions 
Conditions Recommended by other ECU Consultation Bodies 
 NatureScot (conditions recommended by them in their final response to include Habitat
restoration and biodiversity management plans) 
 SEPA (Monitoring; Construction Environment Management Plan, Waste Management
Plan. Peat Management Plan, Acid Rock monitoring and extracted rock material storage
and use strategy) 
 Scottish Forestry (Compensatory Planting details); 
 Transport Scotland;  (Conditions as set out in their consultation response). 
 RSPB (Habitat Management and Landscape integration Plan (HMP); 
Conditions Recommended by the Council to be considered by the ECU 
Biodiversity Officer 
 Prior to the commencement of development a Habitat and biodiversity management
and enhancement strategy shall be provided to the planning authority for their
approval in consultation with NatureScot and RSPB. 
Reason: To ensure that habitat management/restoration and biodiversity enhancement
are carried out in accordance with LDP and NPF 4 Objectives. 
 Prior to the Commencement of works a Construction Environment Management
Plan (CEMP) shall be submitted to the planning authority and shall provide
details of the mitigation, management and enhancement for ornithological
interest, habitat, species, water courses and peat management (CEMP) along
with a series of Tool Box talks to reflect the above and overseen by an Ecological
Page 225

Page 226

Clerk of Works for the approval of the planning Authority in consultation with
SEPA and NatureScot. 
Reason: To ensure these matters are properly addressed prior to the commencement of
works and that biodiversity and habitat improvements are maximised. 
Area Roads Engineer 
 Prior to the commencement of development an Extracted Materials Management
Plan shall be provided which clarifies the locations of disposal/storage/use sites
and the tonnage and vehicle movements associated with this. The applicant
shall seek to find uses for the waste material within the local area before
considering locations further afield.  Evidence of how this has been
considered shall be included within the Extracted Materials Management
Plan. 
Reason: To ensure the road network is suitable and able to accommodate the
necessary HGV vehicular movement associated with the operations and in the
interests of sustainability to ensure that distances travelled are minimised where
possible. 
 Prior to the commencement of development a Traffic Impact Analysis shall be
undertaken to ensure that cumulative demands on the road network associated
with these proposals and any other permitted or projected major infrastructure
proposals in the area shall be provided to the Planning Authority for the approval
in consultation with Transport Scotland. . This report should include a cumulative
report in concert with other S36 and S37 schemes in the North Argyll/ Loch Awe
area paying particular attention to the possibility of utilizing materials locally to
prevent unnecessary vehicle movements thus reducing the potential for any
related deterioration of the fragile local area roads network. 
Reason: To ensure accurate vehicle movement data is available having regard to
many other proposed major infrastructure in area are proposed, particularly those
associated with Grid Infrastructure Upgrade proposals by SSEN. 
Conservation Policy Advisor 
 Works shall only to be undertaken to any Category A Listed structure in
accordance with any separately approved Listed Building Consent for such works. 
Reason To ensure works to the existing Category A Turbine Hall connected to the
two new access tunnels are examined in sufficient detail to ensure no unacceptable
impact on the integrity and character of the existing listed building and to the
satisfaction of HES who are a statutory consultee on works to a Category A Listed
Building. 
 Prior to the commencement of development further detail of the design and
appearance of ; 
I. the new water inlet structure and associated rock cutting/contouring and
II. the referenced extension to the existing substation 
Page 226

Page 227

shall be provided to the planning authority for their approval prior to the
commencement of works. 
Reason: To ensure the appearance of the works are acceptable in the context of the
setting of the Category B listed Dam and also to ensure any potential wider
landscape impacts are minimised. 
Environmental Protection Officer 
 Surface work and underground work should be restricted to: 
• Monday to Friday: 0700 hours until 1900 hours. 
• Saturday: 0700 hours until 1700 hours. 
• Sunday / Public holidays: – no works, except for servicing and maintenance of plant
and equipment and emergency work. 
Reason: In order to protect the amenities of the area from noise and vibration nuisance
and to minimise local community annoyance” 
 Prior to the development commencing detailed information shall be provided on how
the 17 identified private water supplies will be protected during the construction and
operation phases of the proposed development. 
Reason – in the interest of public health and to ensure adequate measures are in place to
protect the identified private water supplies 
Access Manager 
 Prior to the commencement of development an Access Plan and Strategy shall be
submitted for the approval of the Planning Authority. This shall clarify how access to
the formal and informal recreational facilities in the area will be maintained in so far as
is possible during construction operations, and also seek to identify opportunities to
utilise any extracted materials to provide footpath improvements to the surrounding
network. 
Reason: To ensure impacts on the footpath network are minimised and local use of
extracted materials is maximised. 
Worker Housing Strategy 
 Prior to the commencement of development, a strategy for housing incoming
construction workers shall be submitted to and approved in writing by the Planning
Authority.  Thereafter the development shall be carried out in accordance with the
approved details. 
Reason:  In order to mitigate the adverse effects on tourist accommodation  and in the
Oban and Lorn housing market area in accordance with the requirements of NPF4, and in
particular Policy 11C and Policy 25 Objectives. 
Other recommended conditions 
 No works shall commence to form the new quayside and associated permanent
buildings until further details of the design, appearance and materials proposed
associated with these works are submitted to the planning authority for their approval.
Page 227

Page 228

Such details shall include measures to minimise environmental impact and maximise 
biodiversity enhancement through design, layout and landscaping to form habitat 
opportunities on the permanent quayside site and maximise landscape integration 
from open water views in particular. 
Reason:  to ensure that permanent visual impacts, particularly from open water
recreational users are minimised and biodiversity opportunities maximised in design and
construction detail. 
Page 228

Page 229

Page 229

Page 230

This page is intentionally left blank

Page 231

ARGYLL AND BUTE COUNCIL  PPSL Committee 
Development and Economic Growth  15th February 2023 
Planning Performance Framework 2021/2022 
1.0 EXECUTIVE SUMMARY 
1.1 This report contains recent feedback from the Scottish Government in relation to
our Planning Performance Framework (PPF). Appendix A. 
1.2 Our PPF is the principal performance measure for Planning Services
(Development Management and Development Policy – within Planning and
Regulatory Services) and is submitted to the Scottish Government annually for
scrutiny and scoring. The Council’s 2021/22 PPF was submitted in September
2022 and was independently reviewed by the Scottish Government. A copy of
the submitted document was submitted to the PPSL for noting at their meeting
of 28th September 2022. 
1.3 Overall the feedback report is considered overall to be positive registering seven
‘green’, four ‘amber’ outcomes, and two ‘red’ outcomes across the thirteen
performance indicators assessed. Whilst it is disappointing to have any ‘red’
markers it is noted that these relate to performance measures which have been
directly impacted by the pandemic and its impact upon workflow, and staff
availability (absence and vacancies). It is further noted that even where
performance markers have fallen below the National average the deviation is
marginal, and/or there is valid justification for that position. 
1.4 The positive feedback response supports our ‘open for business’ ethos and is
warmly welcomed in the current economic climate. Whilst the Scottish
Government have not identified any improvement actions for ABC this year, the
service must not be complacent with the focus being year on year continuous
improvement.  The PPF for 2022/2023 is due to be submitted in July 2023.   
1.5 It is recommended that the Committee:- 
(a) Note the content of report; and 
(b) Publicise (press, Twitter, Facebook and website release) the positive
feedback from the Scottish Government. 
Page 231 Agenda Item 10

Page 232

ARGYLL AND BUTE COUNCIL  PPSL Committee 
Development and Economic Growth  15th  February 2023 
Planning Performance Framework 2021/2022 
2.0 INTRODUCTION 
2.1 This report contains recent feedback from the Scottish Government in
relation to our Planning Performance Framework (PPF). Appendix A. 
The Executive Summary (above) provides further background
information.     
3.0 RECOMMENDATIONS 
3.1 It is recommended that the Committee:- 
(a) Note the content of report; and 
(b) Publicise (press, Twitter, Facebook and website release) the positive
feedback from the Scottish Government. 
4.0 DETAIL   
What is the Planning Performance Framework? 
4.1 This was Planning Services 11th Annual Planning Performance
Framework (PPF) and is our ‘balance scorecard’ of performance which all
Local Authorities must submit to the Scottish Government for review and
scrutiny.   
4.2 The PPF aims to be a holistic and easy read document that encapsulates
statistical performance indicators as well as more qualitative information
and case studies of good practice for the previous financial year. The basic
structure of the document is stipulated by the Scottish Government but the
character, tone, style and content is all shaped by the individual Authority.
The Scottish Government has suggested that Authorities use the PPF as
more than a means of simply reporting performance but utilise the
document as an opportunity to promote their service and local area, to
incorporate customer feedback and to provide updated narrative on case
study items from previous years. The PPF seeks to focus on the Council
being ‘open for business’ and the positive economic contribution that
Planning Services have made within Argyll and Bute. The PPF presents
case studies and examples of good practice which demonstrates the ability
of the Service to facilitate the delivery of high quality development on the
ground, to provide certainty to developers and investors, to consult and
engage with customers effectively and to ensure that appropriate
management and service delivery structures are in place to work efficiently. 
Page 232

Page 233

Review and Feedback 
4.3  The review of the PPF was carried out by the Scottish Government and
considered by the Minister for Public Finance, Planning and Community
Wealth, Tom Arthur MSP. 
4.4 Within our PPF We managed to showcase a variety of good quality
projects and initiatives that demonstrate our ‘open for business’ and
service improvement ethos.   
4.5 The covering letter and feedback from Tom Arthur MSP is contained in
full at Appendix A, however some pertinent points are highlighted below:- 
 PM 1 Decision Making (Red): This marker was also identified as Red in
2020/21. Performance in the determination of planning applications
remained significantly affected by the impacts of Coronavirus pandemic
during a reporting period where the effects of service disruption/recovery
have significantly impacted the time taken to determine applications,
these include the longer term impacts of managing a significant backlog
of casework that has accrued and reduced staffing resource as a result
of absence and difficulties in recruiting to vacancies. During the 2021/22
reporting period the time taken to determine all categories of application
increased from the previous period. This position was not unexpected
and is reflective of a position where Scottish averages have also
increased across the board. On a more positive note it is highlighted that
Major applications where determined faster than the Scottish average (-
3.8 weeks); and Local (non-householder) applications remained only
marginally (+0.1 weeks) slower than the Scottish average. The
determination of householder applications remained significantly slower
(+1.6 weeks) than the Scottish average however this is indicative of the
prioritisation of available resources toward determination of applications
that were required to respond to recovery from the pandemic, would
deliver significant inward investment/employment, or were time critical in
relation to grant funding or public health issues. It is further noted that
whilst the effects of the pandemic have been less severe during 2022/23
the continuing effects of the pandemic that will also be evident in
performance for the next reporting period. 
 PM 4 Legal Agreements (Amber): This marker was previously identified
a Green in 2020/21. The performance marker seeks to monitor the
efficiency with which a planning authority concludes legal agreements
after resolving to grant planning permission. During 2021/22 the average
time taken to conclude legal agreements increased from 15.5 weeks to
33.6 weeks. It is noted that this performance marker relies on a small
body of applications and is readily skewed, in this instance the resolution
of one matter relating to a major application took 76.3 weeks to conclude
a legal agreement has significantly impacted upon the average
timeframe. It is also recognised however that continuing pressures upon
the DM Management staff resulting from long-term vacancies in the
Service has reduced the scope to provide regular review and monitoring
of outstanding cases awaiting conclusion of legal agreements. 
Page 233

Page 234

 PM 5 Enforcement Charter (Green): This marker has been green for
the previous three reporting periods and recognises that the Council’s
Planning Enforcement Charter has been subject to its statutory bi-annual
review. It is noted that the Charter is due to be reviewed again by March
2024. 
 PM 6 Continuous Improvement (Amber): This marker was previously
identified as Amber in the previous five reporting periods. The Planning
Service received positive feedback for continuing to progress service
improvements during 2021/22 despite the impact of the pandemic, these
are detailed in Part 3 of the PPF. The feedback acknowledges that a
number of service improvements have been put on hold as a result of
Covid-19 and its continuing impacts from the pandemic on service
delivery. 
 PM 7 Local Development Plan (Red): This marker was previously
identified as Red in 2020/21 as the Argyll and Bute Local Development
Plan 2015 has not been replaced within the required 5 year period.
Despite the current adopted LDP being more than 5 years old, this policy
framework is still considered up to date and relevant, and a more than
adequate housing land supply still exists as demonstrated in our annual
Housing Land Audit (which has recently been cited by Scottish
Government as an example of good practice). 
 PM 8 Development Plan Scheme (Amber): This marker was previously
identified as Amber in the previous three reporting periods. Whilst
confirmation that the LDP will not be replaced within the 5 year cycle flags
as Red, this is balanced against the fact that the Council had recognised
that the project was behind time within an updated Development Plan
Scheme and amended the project plan for delivery accordingly. Members
will be aware that the PLDP2 process has taken longer than planned,
partly due to Covid pressures, staff resourcing demands, the complexity
of dealing with over 1000 representations, and extended periods taken
for public and stakeholder consultation at various points during the Plan
production. PLDP2 adoption awaits the return of the Reporter’s
Examination Report which will be provided by the DPEA. This has slipped
beyond the original set timetable, mainly because the production of the
laying before Scottish Parliament of NPF4 which consequently became a
material consideration the Reporters needed to consider. The Council are
still awaiting the Examination report without a precise timetable set. The
timing is a matter for the DPEA and consequently outwith the Council’s
control. 
 PM 14 Stalled Sites / Legacy Cases (Amber): This marker was
previously identified as Red in the previous reporting period. The
feedback commentary identifies that whilst 27 legacy cases were cleared
during the reporting period 40 new cases reached legacy status during
the same time period with a total of 65 undetermined applications as of
31st March 2021. The degradation in this measure is directly attributable
to the matters identified in PM 1 above in relation to determination
timescales, but also a reduction in availability of management resource
available to actively progress determination of legacy cases whilst
addressing the other significant challenges facing the DM Service during
this period. The measure improved from Red to Amber as due to an
increase in the volume of legacy cases that were determined during the
reporting period. 
Page 234

Page 235

Focus on Performance / Resources / Impact of Covid-19 
4.6 The cover letter from the Minister for Public Finance, Planning and
Community wealth, Tom Arthur MSP recognises that 2021/22 has
continued to be a challenging period “for people working in planning, in
the development sector and across Scotland’s communities”. It is further
commented that during 2020-21 whilst “there has been some minor
changes overall in the markings awarded that performance has remained
relatively stable. This is a testament to the hard work and flexibility of
authorities during challenging times and I believe overall, good progress
continues to be made by Scotland’s planning authorities”. 
4.7 The Minister has identified that “ensuring the system is appropriately
resourced is key to improving the performance of planning” and
highlighted that in April 2022 planning fees for most types of development
were increased by between 25% and 50%. The Minister further sets out
his expectation that additional fee income will be “invested in delivering
improvements in Planning Services” but also restates a continuing
commitment to working with Heads of Planning and COSLA to identify
how “to move planning fees closer to covering the full cost of their
determination”. The Minister also notes that Fees for applications made
under the Electricity Act were increased from December 2022 which is
also expected to increase fee income for planning authorities. 
4.8 The Minister has also acknowledged that difficulties in recruiting qualified
planning professionals is a national issue and recognises that “resourcing
is about more than just money and having a pipeline of knowledgeable
and skilled planners is essential to delivering on our ambitions set out in
NPF4. This is why I supported the RTPI and Heads of Planning Scotland’s
Future Planners Project which looked at proposals to help increase the
numbers of people entering the planning profession. We recognise the
importance of delivering on this vision and resourcing and skills
challenges for planning authorities, which we are taking steps to address”. 
4.9 Providing an update on the Scottish Government’s own work programme,
the Minister has confirmed that work is continuing to progress on the
introduction of mandatory training for elected members in the planning
system; the implementation of statutory annual reports by planning
authorities; and the appointment of a Planning Improvement Coordinator
for Scotland. 
5.0 CONCLUSION 
5.1 The 2021/22 PPF demonstrates comparable performance to National
statistics and agreed PPF Performance Markers and showcases a number
of our high quality projects and outcomes, and the manner in which we have
responded to the challenges of operating within a pandemic.   
5.2 Feedback from the Scottish Government is overall considered to be positive
and has confirmed that the Planning Service has an ‘open for business’
approach to delivering sustainable economic growth throughout Argyll and
Bute.   
6.0 IMPLICATIONS
Page 235

Page 236

6.1 Policy: None 
6.2 Financial: None   
6.3 Legal: None 
6.4 HR : None 
6.5 Fairer Scotland Duty: 
6.5.1 Equalities Protected Characteristics: None 
6.5.2  Socio-Economic Duty: None 
6.5.3 Islands: None 
6.6 Risk: Reputational of being identified as a poor performing authority if next
year’s PPF performance is substandard.   
6.7 Customer Service: The PPF report provides Customers with an overview
of the statistical and qualitative performance of the Council as the planning
authority in a format that can be benchmarked with other authorities.   
6.8 Climate Change: None 
Executive Director with responsibility for Development and Economic Growth:
Kirsty Flanagan 
Policy Lead: Councillor Kieron Green
2nd February 2023                                                  
For further information contact: Peter Bain – 01546 604204 
APPENDICES 
Appendix A – Planning Performance Framework 2021/22 Feedback
Page 236

Page 237

Scottish Ministers, special advisers and the Permanent Secretary are
covered by the terms of the Lobbying (Scotland) Act 2016.  See
www.lobbying.scot
St Andrew’s House, Regent Road, Edinburgh  EH1 3DG
www.gov.scot


Ministear airson Ionmhas Poblach, Dealbhachadh
agus Beartas Còimhearsnachd
Minister for Public Finance, Planning and Community
Wealth
Tom Arthur MSP
T: 0300 244 4000
E: scottish.ministers@gov.scot

Pippa Milne
Chief Executive
Argyll and Bute Council
22 December 2022
Dear Pippa Milne
I am pleased to enclose feedback on your authority’s eleventh Planning Performance
Framework (PPF) Report, for the period April 2021 to March 2022. 
The reporting period which these reports cover has continued to present challenges for
people working within planning, in the development sector and across Scotland’s
communities. 
Ensuring the system is appropriately resourced is key to improving the performance of
planning,  which is why in April I implemented the biggest change to planning fees in 8 years,
with fees for most types of development increasing by between 25% and 50%. At the time I
said I would expect to see this additional  money invested in delivering improvements in
Planning Services. It is too early to know whether that has occurred, however, I have heard
positive feedback from some authorities who have managed to recruit or retain staff as a
result of the additional income. I also committed to working with Heads of Planning and
COSLA to identify how we could move planning fees closer to covering the full cost of their
determination. That work is ongoing and I expect to receive some
conclusions/recommendations early in the new year.
I am also encouraged to see the fees for applications made under the Electricity Act also
increasing on 13th December and the voluntary contribution of 50% of the fee, for certain
types of application, being passed to planning authorities being maintained. 
However, I recognise that resourcing is about more than just money and having a pipeline of
knowledgeable and skilled planners is essential to delivering on our ambitions set out in
NPF4. This is why I supported the RTPI and Heads of Planning Scotland’s Future Planners
Project which looked at proposals to help increase the numbers of people entering the
planning profession. We recognise the importance of delivering on this vision and the
resourcing and skills challenges for planning authorities, which we are taking steps to
address.
Appendix A Page 237

Page 238

Scottish Ministers, special advisers and the Permanent Secretary are
covered by the terms of the Lobbying (Scotland) Act 2016.  See
www.lobbying.scot 
St Andrew’s House, Regent Road, Edinburgh  EH1 3DG
www.gov.scot

 
Work is also progressing on 
• the introduction of mandatory training for elected members in the planning system; 
• the implementation of statutory annual reports by planning authorities; and 
• the appointment of a Planning Improvement Coordinator for Scotland. 
Turning to the 2021-22 PPF reporting year, although, as expected, there have been some
minor changes overall in the markings awarded, the figures indicate that performance has
remained relatively stable. This is a testament to the hard work and flexibility of authorities
during challenging times and I believe that overall, good progress continues to be made by
Scotland’s planning authorities. 
If you would like to discuss any of the markings awarded below, please email
chief.planner@gov.scot and a member of the team will be happy to discuss these with you. 
TOM ARTHUR 
CC: Fergus Murray, Head of Economic Development and Strategic Transportation 
Page 238

Page 239

Scottish Ministers, special advisers and the Permanent Secretary are
covered by the terms of the Lobbying (Scotland) Act 2016.  See
www.lobbying.scot 
St Andrew’s House, Regent Road, Edinburgh  EH1 3DG
www.gov.scot

 
PERFORMANCE MARKERS REPORT 2021-22 
Name of planning authority: Argyll & Bute Council 
The High Level Group on Performance agreed a set of performance markers. We have assessed your report against
those markers to give an indication of priority areas for improvement action. The high level group will monitor and
evaluate how the key markers have been reported and the value which they have added. 
The Red, Amber, Green ratings are based on the evidence provided within the PPF reports. Where no information or
insufficient evidence has been provided, a ‘red’ marking has been allocated. 
No. Performance Marker RAG
rating
Comments
1 Decision-making: continuous
reduction of average timescales for
all development categories [Q1 -
Q4] 
Red Major Applications
Your timescales of 40.8 weeks are slower than the previous
year but faster than the Scottish average of 44.6 weeks. 
RAG = Amber 
Local (Non-Householder) Applications
Your timescales of 13.6 weeks are slower than the previous
year and slower than the Scottish average of 13.5 weeks. 
RAG = Red 
Householder Applications
Your timescales of 10.3 weeks are slower than the previous
year and the Scottish average of 8.7 weeks.
RAG = Red 
Overall RAG = Red
2 Processing agreements:
• offer to all prospective
applicants for major
development planning
applications; and
• availability publicised on
website
Green You encourage processing agreements to applicants for all
major and locally significant developments through pre-
application discussions, user forums and online.
RAG = Green 
Processing agreement information is available through your
website.
RAG = Green 
Overall RAG = Green
3 Early collaboration with applicants
and consultees
• availability and promotion
of pre-application
discussions for all
prospective applications;
and
• clear and proportionate
requests for supporting
information
Green You provide a pre-application advice service which is
promoted through the website, user forums and by staff
engaging with prospective applicants. 
RAG = Green 
You have a proportionate and clear process for requesting
supporting information including engaging with consultees
and other council services to identify issues/constraints prior
to the application being submitted. During the 2021/22
reporting period you updated and published guidance on the
submission and processing of applications under S64 of the
planning act.
RAG = Green 
Overall RAG = Green  
Page 239

Page 240

Scottish Ministers, special advisers and the Permanent Secretary are
covered by the terms of the Lobbying (Scotland) Act 2016.  See
www.lobbying.scot 
St Andrew’s House, Regent Road, Edinburgh  EH1 3DG
www.gov.scot

 
4 Legal agreements: conclude (or
reconsider) applications after
resolving to grant permission
reducing number of live
applications more than 6 months
after resolution to grant (from last
reporting period)
Amber Your average timescales of 33.6 weeks for applications with
legal agreements is slower than last year and slightly slower
than the Scottish average of 33.2 weeks. 
You state that applications which are subject to a legal
agreement are regularly reviewed to ensure progress and
completion within 6 months.
5 Enforcement charter updated / re-
published within last 2 years
Green Your enforcement charter was reviewed and updated in
March 2022. 
6 Continuous improvement:
• progress ambitious and
relevant service
improvement commitments
identified through PPF
report
Amber Out of 12 service improvement commitments, 1 was
delivered, 6 are progressing, 4 are on hold and 1 has been
discontinued. You have identified a good range of further
commitments for the coming year. 
7 Local development plan less than
5 years since adoption
Red Your development plan was more than 5 years old at the time
of reporting (adopted in 2015).
8 Development plan scheme 
– next LDP:
• project planned and
expected to be delivered to
planned timescale
Amber The LDP2 was expected to be completed in 2022 according
to the 20/21 reporting period. The LDP2 is currently at
Examination Stage and scheduled for adoption in 2023. 
9 &
10 LDP Engagement:
• stakeholders including
Elected Members, industry,
agencies, the public and
Scottish Government are
engaged appropriately
through all key stages of
development plan
preparation.
N/A 
11 Policy Advice 
• Production of relevant and
up to date policy advice
Green Relevant supplementary guidance is reviewed and updated
regularly including publishing guidance on S64 submissions
and Local Place Plans during 2021/2022 reporting period. 
12 Corporate working across
services to improve outputs and
services for customer benefit (for
example: protocols; joined-up
services; single contact
arrangements; joint pre-application
advice)
Green A number of your case studies demonstrate you approach to
corporate working such as the Shopfront Improvement
Scheme, Dunbeg Masterplan and CCDC Masterplan for
Scalasaig. 
13 Sharing good practice, skills and
knowledge between authorities 
Green Your PPF report, including the case studies, set out a
number of examples of benchmarking and knowledge
sharing. Planning officers attend a number of forums, such as
HopS, the LA Aquaculture Forum,  and Clyde Marine
Planning Partnership. Officers have engaged with other rural
authorities to review and update procedures for handling prior
notification/approval submissions. 
14 Stalled sites / legacy cases:
conclusion or withdrawal of old
planning applications and reducing
number of live applications more
than one year old
Amber You have cleared 27 cases during the reporting year which is
an increase from last year however, 65 cases remain which
is an increase from 57. This is an increase on the number
which remained at the end of last year.  
Page 240

Page 241

Scottish Ministers, special advisers and the Permanent Secretary are
covered by the terms of the Lobbying (Scotland) Act 2016.  See
www.lobbying.scot 
St Andrew’s House, Regent Road, Edinburgh  EH1 3DG
www.gov.scot

 
15 Developer contributions: 
clear and proportionate
expectations
• set out in development plan
(and/or emerging plan);
and
• in pre-application
discussions
Green Your LDP, supported by supplementary guidance, sets out
expectations for developer contributions and sets out how
contributions are proportionate to the scale, nature and
impact of the proposed development.
RAG = Green 
Expectations for developer contributions are established in
pre-application discussions or where no pre-application
engagement is sought then established during the
assessment process. 
RAG = Green 
Overall RAG = Green  
Page 241

Page 242

Scottish Ministers, special advisers and the Permanent Secretary are
covered by the terms of the Lobbying (Scotland) Act 2016.  See
www.lobbying.scot 
St Andrew’s House, Regent Road, Edinburgh  EH1 3DG
www.gov.scot

 
ARGYLL AND BUTE COUNCIL 
Performance against Key Markers 
Marker 13-14 14-15 15-16 16-17 17-18 18-19 19-20 20-21 21-22
1 Decision making timescales         
2 Processing agreements         
3 Early collaboration          
4 Legal agreements         
5 Enforcement charter         
6 Continuous improvement          
7 Local development plan         
8 Development plan scheme         
9
&
10
LDP Early Engagement
N/A N/A N/A   N/A N/A N/A N/A
11 Regular and proportionate
advice to support
applications 
12 Corporate working across
services         
13 Sharing good practice, skills
and knowledge         
14 Stalled sites/legacy cases         
15 Developer contributions           
Overall Markings (total numbers for red, amber and green)    
2013-14  0 5 8
2014-15 0 2 11
2015-16 0 3 10
2016-17 1 3 11
2017-18 1 3 11
2018-19 0 3 10
2019-20 0 3 10
2020-21 3 2 8
2021-22 1 4 7 
Decision Making Timescales (weeks) 
13-14 14-15 15-16 16-17 17-18 18-19 19-20 20-21 21-22
2021-22
Scottish
Average
Major
Development 59.1 14.1 23.3 22.1 37.9 28.3 33.9 40.4 40.8 44.6
Local 
(Non-
Householder)
Development
13.1 10.8 10.3 12.4 12.6 10.8
10.2 12.5 13.6
13.5
Householder
Development 7.2 6.9 7.0 7.5 7.9 7.1 7.2 9.1 10.3 8.7 
Page 242